NASA Technical Reports Server (NTRS)
Bonine, Lauren
2015-01-01
The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.
NASA Technical Reports Server (NTRS)
Smith, Greg
2003-01-01
Schedule risk assessments determine the likelihood of finishing on time. Each task in a schedule has a varying degree of probability of being finished on time. A schedule risk assessment quantifies these probabilities by assigning values to each task. This viewgraph presentation contains a flow chart for conducting a schedule risk assessment, and profiles applicable several methods of data analysis.
Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hulett, David T.; Nosbisch, Michael R.
This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost,more » and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)« less
Integrated Hybrid System Architecture for Risk Analysis
NASA Technical Reports Server (NTRS)
Moynihan, Gary P.; Fonseca, Daniel J.; Ray, Paul S.
2010-01-01
A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.
JCL Implementation On A Human Spaceflight Program
NASA Technical Reports Server (NTRS)
Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William
2013-01-01
Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.
Amano, Hoichi; Fukuda, Yoshiharu; Yokoo, Takashi; Yamaoka, Kazue
2018-03-27
Shift workers have a high risk of cardiovascular disease (CVD). Systemic inflammation measured has been associated with the risk of CVD onset, in addition to classical risk factors. However, the association between work schedule and inflammatory cytokine levels remains unclear. The purpose of this study was to examine the association between work schedule and interleukin-6 (IL-6)/high-sensitivity C-reactive protein (hs-CRP) levels among Japanese workers. The present cross-sectional study was a part of the Japanese Study of Health, Occupation and Psychosocial Factors Related Equity (J-HOPE). A total of 5259 persons who measured inflammatory cytokine were analyzed in this study. One-way analysis of variance was used to test log-transformed IL-6/hs-CRP differences by work schedule. Multiple regression analysis was used to examine the difference adjusted for other possible CVD risk factors. There were 3660 participants who had a regular work schedule; the remaining schedules were shift work without night work for 181 participants, shift work with night work for 1276 participants, and only night work for 142 participants. The unadjusted model showed that only night workers were significantly related to high levels of IL-6 compared with regular workers. Even in the multiple regression analysis, the higher level of IL-6 among only night workers remained significant (β=0.058, P=0.01). On the contrary, hs-CRP was not. The present study revealed that only night shift work is significantly associated with high levels of IL-6 in Japanese workers. These observations help us understand the mechanism for the association between work schedule and CVD onset.
Mancio, Jennifer; Leal, Cátia; Ferreira, Marta; Norton, Pedro; Lunet, Nuno
2018-04-27
Recent studies suggested that the relation between night-shift work and prostate cancer may differ between rotating and fixed schedules. We aimed to quantify the independent association between night-shift work and prostate cancer, for rotating and fixed schedules. We searched MEDLINE for studies assessing the association of night-shift work, by rotating or fixed schedules, with prostate cancer. We computed summary relative risk (RR) estimates with 95% confidence intervals (95% CI) using the inverse variance method and quantified heterogeneity using the I 2 statistic. Meta-regression analysis was used to compare the summary RR estimates for rotating and fixed schedules, while reducing heterogeneity. A total of nine studies assessed the effect of rotating and, in addition, four of them provided the effect of fixed night-shift work, in relation to daytime workers. Rotating night-shift work was associated with a significantly increased risk of prostate cancer (RR = 1.06, 95% CI of 1.01 to 1.12; I 2 = 50%), but not fixed night-shift work (RR of 1.01, 95% CI of 0.81 to 1.26; I 2 = 33%). In meta-regression model including study design, type of population, and control of confounding, the summary RR was 20% higher for rotating vs. fixed schedule, with heterogeneity fully explained by these variables. This is the first meta-analysis suggesting that an increased risk of prostate cancer may be restricted to workers with rotating night shifts. However, the association was weak and additional studies are needed to further clarify this relation before it can be translated into measures for risk reduction in occupational settings.
NASA Instrument Cost/Schedule Model
NASA Technical Reports Server (NTRS)
Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George
2011-01-01
NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.
2013-06-30
QUANTITATIVE RISK ANALYSIS The use of quantitative cost risk analysis tools can be valuable in measuring numerical risk to the government ( Galway , 2004...assessment of the EVMS itself. Galway (2004) practically linked project quantitative risk assessment to EVM by focusing on cost, schedule, and...www.amazon.com Galway , L. (2004, February). Quantitative risk analysis for project management: A critical review (RAND Working Paper WR-112-RC
Schedule Risk Analysis Of Southern Mainway Construction In Jember Regency
NASA Astrophysics Data System (ADS)
Susilo, K.; Wiguna, I. P. A.; Adi, T. J. W.
2017-11-01
In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.
Zhang, Hui; Schaubel, Douglas E; Kalbfleisch, John D; Bragg-Gresham, Jennifer L; Robinson, Bruce M; Pisoni, Ronald L; Canaud, Bernard; Jadoul, Michel; Akiba, Takashi; Saito, Akira; Port, Friedrich K; Saran, Rajiv
2012-01-01
The risk of death for hemodialysis patients is thought to be highest on the days following the longest interval without dialysis (usually Mondays and Tuesdays); however, existing results are inconclusive. To clarify this we analyzed Dialysis Outcomes and Practice Patterns Study (DOPPS) data of 22,163 hemodialysis patients from the United States, Europe and Japan. Our study focused on the association between dialysis schedule and day-of-week of all-cause, cardiovascular and non-cardiovascular mortality with day-of-week coding as a time-dependent covariate. The models were adjusted for dialysis schedule, age, country, DOPPS Phase I or II, and other demographic and clinical covariates comparing mortality on each day to the 7-day average. Patients on a Monday-Wednesday-Friday (MFW) schedule had elevated all-cause mortality on Monday, and those on a Tuesday-Thursday-Saturday (TTS) schedule increased risk of mortality on Tuesday in all 3 regions. The association between day-of-week mortality and schedule was generally stronger for cardiovascular than non-cardiovascular mortality, and most pronounced in the United States. Unexpectedly, Japanese patients on a MWF schedule had a higher risk of non-cardiovascular mortality on Fridays, and European patients on a TTS schedule experienced an elevated cardiovascular mortality on Saturdays. Thus, future studies are needed to evaluate the influence of practice patterns on schedule-specific mortality and factors that could modulate this effect. PMID:22297673
Understanding Acquisition Cycle Time: Focusing the Research Problem
2013-11-01
Browning, Tyson R., and Steven D. Eppinger. “Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development.” IEEE...2009. Clark, Kim, and Steven Wheelwright. Revolutionizing Development: Quantum Leaps in Speed, Efficiency and Quality. New York, NY: The Free Press...1992. Cross, Steven M. Data Analysis and its Impact on Predicting Schedule and Cost Risk. AFIT/GIR/ENC/06M-01. Wright-Patterson AFB OH: AFIT
NASA Technical Reports Server (NTRS)
Wilcox, Margaret
2008-01-01
A CSEA is similar to a Failure Modes Effects Analysis (FMEA). A CSEA tracks risk, deterrence, and occurrence of sources of contamination and their mitigation plans. Documentation is provided spanning mechanical and electrical assembly, precision cleaning, thermal vacuum bake-out, and thermal vacuum testing. These facilities all may play a role in contamination budgeting and reduction ultimately affecting test and flight. With a CSEA, visibility can be given to availability of these facilities, test sequencing and trade-offs. A cross-functional team including specialty engineering, contamination control, electrostatic dissipation, manufacturing, testing, and material engineering participate in an exercise that identifies contaminants and minimizes the complexity of scheduling these facilities considering their volatile schedules. Care can be taken in an efficient manner to insure correct cleaning processes are employed. The result is reduction in cycle time ("schedule hits"), reduced cost due to rework, reduced risk and improved communication and quality while achieving adherence to the Contamination Control Plan.
Banshodani, Masataka; Fukuma, Shingo; Moriishi, Misaki; Shintaku, Sadanori; Tsuchiya, Shinichiro
2017-01-01
There have been no studies as yet that have evaluated how hemodialysis (HD) schedules affect the day of the week of hospitalization for cardiovascular diseases (CVDs) and infectious diseases (IDs), over a period of time. Herein, we performed a retrospective observational cohort study (1995–2014) evaluating 11,111 hospitalizations in 1,953 patients with end-stage renal disease, receiving HD 3 times a week (following either a Monday-Wednesday-Friday [MWF] schedule or a Tuesday-Thursday-Saturday [TTS] schedule) or receiving frequent HD (FHD) at least 4 times a week. Overall, hospitalization rates for CVDs and IDs were the highest on Monday in the MWF schedule and Tuesday in the TTS schedule compared to the average rates for all the days of the week. When generalized estimating equations (GEEs) were used in conjunction with robust variance estimators of each type of CVD, the risk for pulmonary edema was found to be significantly higher on Sunday and Monday in the MWF schedule and Monday and Tuesday in the TTS schedule. For both cerebrovascular and ischemic heart disease, the risks were significantly higher on Tuesday in the MWF schedule and Wednesday in the TTS schedule. Moreover, there were significant differences in the day of the week risks among the various CVD types. On trend analysis, the overall hospitalization rate for CVDs on the first HD day did not decrease (P = 0.2); however, the hospitalization rate for IDs on the first HD day significantly decreased (P = 0.02) over a span of 20 years. When GEEs were used in the case of FHD patients with severe heart failure, the hospitalization rate on the first HD day (Monday) significantly decreased after FHD initiation (P = 0.04). It was found that HD schedules affected the day of the week of hospitalization for CVDs. FHD may lower the day of the week risk. PMID:28700621
Expert systems in civil engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kostem, C.N.; Maher, M.L.
1986-01-01
This book presents the papers given at a symposium on expert systems in civil engineering. Topics considered at the symposium included problem solving using expert system techniques, construction schedule analysis, decision making and risk analysis, seismic risk analysis systems, an expert system for inactive hazardous waste site characterization, an expert system for site selection, knowledge engineering, and knowledge-based expert systems in seismic analysis.
The use of cluster analysis techniques in spaceflight project cost risk estimation
NASA Technical Reports Server (NTRS)
Fox, G.; Ebbeler, D.; Jorgensen, E.
2003-01-01
Project cost risk is the uncertainty in final project cost, contingent on initial budget, requirements and schedule. For a proposed mission, a dynamic simulation model relying for some of its input on a simple risk elicitation is used to identify and quantify systemic cost risk.
NASA Technical Reports Server (NTRS)
Regenie, Victoria
2005-01-01
Contents include the following: General Background and Introduction of Capability. Roadmaps for Systems Engineering Cost/Risk Analysis. Agency Objectives. Strategic Planning Transformation. Review Capability Roadmaps and Schedule. Review Purpose of NRC Review. Capability Roadmap Development (Progress to Date).
Perceptions of randomized security schedules.
Scurich, Nicholas; John, Richard S
2014-04-01
Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.
DOT National Transportation Integrated Search
2018-01-11
Background: Scheduled napping during work shifts may be an effective way to mitigate fatigue-related risk. This study aimed to critically review and synthesize existing literature on the impact of scheduled naps on fatigue-related outcomes for EMS pe...
NASA Technical Reports Server (NTRS)
Dickinson, William B.
1995-01-01
An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.
Ramskov, Daniel; Nielsen, Rasmus Oestergaard; Sørensen, Henrik; Parner, Erik; Lind, Martin; Rasmussen, Sten
2016-04-23
Injury incidence and prevalence in running populations have been investigated and documented in several studies. However, knowledge about injury etiology and prevention is needed. Training errors in running are modifiable risk factors and people engaged in recreational running need evidence-based running schedules to minimize the risk of injury. The existing literature on running volume and running intensity and the development of injuries show conflicting results. This may be related to previously applied study designs, methods used to quantify the performed running and the statistical analysis of the collected data. The aim of the Run Clever trial is to investigate if a focus on running intensity compared with a focus on running volume in a running schedule influences the overall injury risk differently. The Run Clever trial is a randomized trial with a 24-week follow-up. Healthy recreational runners between 18 and 65 years and with an average of 1-3 running sessions per week the past 6 months are included. Participants are randomized into two intervention groups: Running schedule-I and Schedule-V. Schedule-I emphasizes a progression in running intensity by increasing the weekly volume of running at a hard pace, while Schedule-V emphasizes a progression in running volume, by increasing the weekly overall volume. Data on the running performed is collected by GPS. Participants who sustain running-related injuries are diagnosed by a diagnostic team of physiotherapists using standardized diagnostic criteria. The members of the diagnostic team are blinded. The study design, procedures and informed consent were approved by the Ethics Committee Northern Denmark Region (N-20140069). The Run Clever trial will provide insight into possible differences in injury risk between running schedules emphasizing either running intensity or running volume. The risk of sustaining volume- and intensity-related injuries will be compared in the two intervention groups using a competing risks approach. The trial will hopefully result in a better understanding of the relationship between the running performed and possible differences in running-related injury risk and the injuries developed. Clinical Trials NCT02349373 - January 23, 2015.
Risk analysis of computer system designs
NASA Technical Reports Server (NTRS)
Vallone, A.
1981-01-01
Adverse events during implementation can affect final capabilities, schedule and cost of a computer system even though the system was accurately designed and evaluated. Risk analysis enables the manager to forecast the impact of those events and to timely ask for design revisions or contingency plans before making any decision. This paper presents a structured procedure for an effective risk analysis. The procedure identifies the required activities, separates subjective assessments from objective evaluations, and defines a risk measure to determine the analysis results. The procedure is consistent with the system design evaluation and enables a meaningful comparison among alternative designs.
Teaching Risk Analysis in an Aircraft Gas Turbine Engine Design Capstone Course
2016-01-01
American Institute of Aeronautics and Astronautics 1 Teaching Risk Analysis in an Aircraft Gas Turbine Engine Design Capstone Course...development costs, engine production costs, and scheduling (Byerley A. R., 2013) as well as the linkage between turbine inlet temperature, blade cooling...analysis SE majors have studied and how this is linked to the specific issues they must face in aircraft gas turbine engine design. Aeronautical and
Game Schedules and Rate of Concussions in the National Football League.
Teramoto, Masaru; Cushman, Daniel M; Cross, Chad L; Curtiss, Heather M; Willick, Stuart E
2017-11-01
Concussion prevention in the National Football League (NFL) is an important priority for player safety. The NFL now has modified game schedules, and one concern is that unconventional game schedules, such as a shortened rest period due to playing on a Thursday rather than during the weekend, may lead to an increased risk of injuries. Unconventional game schedules in the NFL are associated with an increased rate of concussion. Descriptive epidemiological study. This study analyzed concussions and game schedules over the NFL regular seasons from 2012 to 2015 (4 years). Documented numbers of concussions, identified by use of the online database PBS Frontline Concussion Watch, were summarized by regular-season weeks. Association of days of rest and game location (home, away, or overseas) with the rate of concussion was examined by use of the χ 2 test. Logistic regression analysis was performed to examine the relationships of days of rest and home/away games to the risk of repeated concussions, with adjustment for player position. A total of 582 concussions were analyzed in this study. A significantly greater number of concussions occurred in the second half of the season ( P < .01). No significant association was found between the rate of concussion and the days of rest, game location, or timing of the bye week by the team or the opponent ( P > .05). Game schedules were not significantly associated with the occurrence of repeat concussions ( P > .05). Unconventional game schedules in the NFL, including playing on Thursday and playing overseas, do not seem to put players at increased risk of concussions.
12 CFR 347.209 - Pledge of assets.
Code of Federal Regulations, 2011 CFR
2011-01-01
... to the risk-based assessment schedule contained in this paragraph, of the insured branch's average... most recent calendar quarter. (2) Risk-based assessment schedule. The risk-based asset pledge required by paragraph (b)(1) will be determined by utilizing the following risk-based assessment schedule...
12 CFR 347.209 - Pledge of assets.
Code of Federal Regulations, 2012 CFR
2012-01-01
... to the risk-based assessment schedule contained in this paragraph, of the insured branch's average... most recent calendar quarter. (2) Risk-based assessment schedule. The risk-based asset pledge required by paragraph (b)(1) will be determined by utilizing the following risk-based assessment schedule...
Project Scheduling Based on Risk of Gas Transmission Pipe
NASA Astrophysics Data System (ADS)
Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.
2018-03-01
The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arruda Viani, Gustavo, E-mail: gusviani@gmail.com; Stefano, Eduardo Jose; Vendito Soares, Francisco
2011-07-15
Purpose: To evaluate whether the risk of local recurrence depends on the biologic effective dose (BED) or fractionation dose in patients with resectable rectal cancer undergoing preoperative radiotherapy (RT) compared with surgery alone. Methods and Materials: A meta-analysis of randomized controlled trials (RCTs) was performed. The MEDLINE, Embase, CancerLit, and Cochrane Library databases were systematically searched for evidence. To evaluate the dose-response relationship, we conducted a meta-regression analysis. Four subgroups were created: Group 1, RCTs with a BED >30 Gy{sub 10} and a short RT schedule; Group 2, RCTs with BED >30 Gy{sub 10} and a long RT schedule; Groupmore » 3, RCTs with BED {<=}30 Gy{sub 10} and a short RT schedule; and Group 4, RCTs with BED {<=}30 Gy{sub 10} and a long RT schedule. Results: Our review identified 21 RCTs, yielding 9,097 patients. The pooled results from these 21 randomized trials of preoperative RT showed a significant reduction in mortality for groups 1 (p = .004) and 2 (p = .03). For local recurrence, the results were also significant in groups 1 (p = .00001) and 2 (p = .00001).The only subgroup that showed a greater sphincter preservation (SP) rate than surgery was group 2 (p = .03). The dose-response curve was linear (p = .006), and RT decreased the risk of local recurrence by about 1.7% for each Gy{sub 10} of BED. Conclusion: Our data have shown that RT with a BED of >30 Gy{sub 10} is more efficient in reducing local recurrence and mortality rates than a BED of {<=}30 Gy{sub 10}, independent of the schedule of fractionation used. A long RT schedule with a BED of >30 Gy{sub 10} should be recommended for sphincter preservation.« less
NASA Technical Reports Server (NTRS)
Smith, Greg
2003-01-01
Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".
Interim reliability evaluation program, Browns Ferry 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1981-01-01
Probabilistic risk analysis techniques, i.e., event tree and fault tree analysis, were utilized to provide a risk assessment of the Browns Ferry Nuclear Plant Unit 1. Browns Ferry 1 is a General Electric boiling water reactor of the BWR 4 product line with a Mark 1 (drywell and torus) containment. Within the guidelines of the IREP Procedure and Schedule Guide, dominant accident sequences that contribute to public health and safety risks were identified and grouped according to release categories.
Fischer, Dorothee; Lombardi, David A; Folkard, Simon; Willetts, Joanna; Christiani, David C
2017-01-01
Fatigue is a major risk factor for occupational 'accidents' and injuries, and involves dimensions of physical, mental, and muscular fatigue. These dimensions are largely influenced by temporal aspects of work schedules. The "Risk Index" combines four fatigue-related components of work schedules to estimate occupational 'accident' and injury risk based on empirical trends: shift type (morning, afternoon/evening, night), length and consecutive number, and on-shift rest breaks. Since its first introduction in 2004, several additional studies have been published that allow the opportunity to improve the internal and external validity of the "Risk Index". Thus, we updated the model's estimates by systematically reviewing the literature and synthesizing study results using meta-analysis. Cochrane Collaboration directives and MOOSE guidelines were followed. We conducted systematic literature searches on each model component in Medline. An inverse variance approach to meta-analysis was used to synthesize study effect sizes and estimate between-studies variance ('heterogeneity'). Meta-regression models were conducted to explain the heterogeneity using several effect modifiers, including the sample age and sex ratio. Among 3,183 initially identified abstracts, after screening by two independent raters (95-98% agreement), 29 high-quality studies were included in the meta-analysis. The following trends were observed: Shift type. Compared to morning shifts, injury risk significantly increased on night shifts (RR = 1.36 [95%CI = 1.15-1.60], n = 14 studies), while risk was slightly elevated on afternoon/evening shifts, although non-significantly (RR = 1.12 [0.76-1.64], n = 9 studies). Meta-regressions revealed worker's age as a significant effect modifier: adolescent workers (≤ 20 y) showed a decreased risk on the afternoon/evening shift compared to both morning shifts and adult workers (p < 0.05). Number of consecutive shifts. Compared to the first shift in a block of consecutive shifts, risk increased exponentially for morning shifts (e.g., 4th: RR = 1.09 [0.90-1.32]; n = 6 studies) and night shifts (e.g., 4th: RR = 1.36 [1.14-1.62]; n = 8 studies), while risk on afternoon/evening shifts appeared unsystematic. Shift length. Injury risk rose substantially beyond the 9th hour on duty, a trend that was mirrored when looking at shift lengths (e.g., >12 h: RR = 1.34 [1.04-1.51], n = 3 studies). Rest breaks. Risk decreased for any rest break duration (e.g., 31-60 min: RR = 0.35 [0.29-0.43], n = 2 studies). With regards to time between breaks, risk increased with every additional half hour spent on the work task compared to the first 30 min (e.g., 90-119 min: RR = 1.62 [1.00-2.62], n = 3 studies). Rest break duration and interval seem to interact such that with increasing duration, the time between breaks becomes irrelevant. The updated "Risk Index". All four components were combined to form the updated model and the relative risk values estimated for a variety of work schedules. The resulting "Risk Map" shows regions of highest risk when rest breaks are not taken frequently enough (i.e. <4 h) or are too short (i.e. <30 min), when shift length exceeds 11 h, and when work takes place during the night (particularly for >3 consecutive night shifts). The "Risk Index" is proposed as an empirical model to predict occupational 'accident' and injury risk based on the most recent data in the field, and can serve as a tool to evaluate hazards and maximize safety across different work schedules.
12 CFR 327.10 - Assessment rate schedules.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) The risk factors and other factors taken into account pursuant to 12 U.S.C. 1817(b)(1); and (v) Any... prescribed in the following schedule: Initial Base Assessment Rate Schedule Risk category I * Minimum Maximum II III IV Annual rates (in basis points) 12 16 22 32 45 * All amounts for all risk categories are in...
12 CFR 327.10 - Assessment rate schedules.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) The risk factors and other factors taken into account pursuant to 12 U.S.C. 1817(b)(1); and (v) Any... prescribed in the following schedule: Initial Base Assessment Rate Schedule Risk category I * Minimum Maximum II III IV Annual rates (in basis points) 12 16 22 32 45 * All amounts for all risk categories are in...
ERIC Educational Resources Information Center
Fickes, Michael
1998-01-01
Examines issues concerning outsourcing student transportation services: cost; management needs and capabilities; goals; and politics. Critical areas of transportation management are highlighted such as personnel management, student management and discipline, risk management, fleet analysis, and routing and scheduling. (GR)
Code of Federal Regulations, 2012 CFR
2012-10-01
... TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Substantive... fatigue mitigation tools to reduce the risk for fatigue to a level that does not violate the fatigue... mitigation tools so as to present a risk for a level of fatigue that does not violate the applicable fatigue...
Code of Federal Regulations, 2013 CFR
2013-10-01
... TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Substantive... fatigue mitigation tools to reduce the risk for fatigue to a level that does not violate the fatigue... mitigation tools so as to present a risk for a level of fatigue that does not violate the applicable fatigue...
Code of Federal Regulations, 2014 CFR
2014-10-01
... TRANSPORTATION HOURS OF SERVICE OF RAILROAD EMPLOYEES; RECORDKEEPING AND REPORTING; SLEEPING QUARTERS Substantive... fatigue mitigation tools to reduce the risk for fatigue to a level that does not violate the fatigue... mitigation tools so as to present a risk for a level of fatigue that does not violate the applicable fatigue...
A methodology for spacecraft technology insertion analysis balancing benefit, cost, and risk
NASA Astrophysics Data System (ADS)
Bearden, David Allen
Emerging technologies are changing the way space missions are developed and implemented. Technology development programs are proceeding with the goal of enhancing spacecraft performance and reducing mass and cost. However, it is often the case that technology insertion assessment activities, in the interest of maximizing performance and/or mass reduction, do not consider synergistic system-level effects. Furthermore, even though technical risks are often identified as a large cost and schedule driver, many design processes ignore effects of cost and schedule uncertainty. This research is based on the hypothesis that technology selection is a problem of balancing interrelated (and potentially competing) objectives. Current spacecraft technology selection approaches are summarized, and a Methodology for Evaluating and Ranking Insertion of Technology (MERIT) that expands on these practices to attack otherwise unsolved problems is demonstrated. MERIT combines the modern techniques of technology maturity measures, parametric models, genetic algorithms, and risk assessment (cost and schedule) in a unique manner to resolve very difficult issues including: user-generated uncertainty, relationships between cost/schedule and complexity, and technology "portfolio" management. While the methodology is sufficiently generic that it may in theory be applied to a number of technology insertion problems, this research focuses on application to the specific case of small (<500 kg) satellite design. Small satellite missions are of particular interest because they are often developed under rigid programmatic (cost and schedule) constraints and are motivated to introduce advanced technologies into the design. MERIT is demonstrated for programs procured under varying conditions and constraints such as stringent performance goals, not-to-exceed costs, or hard schedule requirements. MERIT'S contributions to the engineering community are its: unique coupling of the aspects of performance, cost, and schedule; assessment of system level impacts of technology insertion; procedures for estimating uncertainties (risks) associated with advanced technology; and application of heuristics to facilitate informed system-level technology utilization decisions earlier in the conceptual design phase. MERIT extends the state of the art in technology insertion assessment selection practice and, if adopted, may aid designers in determining the configuration of complex systems that meet essential requirements in a timely, cost-effective manner.
Alonso-Marsden, Shelley; Dodge, Kenneth A; O'Donnell, Karen J; Murphy, Robert A; Sato, Jeannine M; Christopoulos, Christina
2013-08-01
As nurse home visiting to prevent child maltreatment grows in popularity with both program administrators and legislators, it is important to understand engagement in such programs in order to improve their community-wide effects. This report examines family demographic and infant health risk factors that predict engagement and follow-through in a universal home-based maltreatment prevention program for new mothers in Durham County, North Carolina. Trained staff members attempted to schedule home visits for all new mothers during the birthing hospital stay, and then nurses completed scheduled visits three to five weeks later. Medical record data was used to identify family demographic and infant health risk factors for maltreatment. These variables were used to predict program engagement (scheduling a visit) and follow-through (completing a scheduled visit). Program staff members were successful in scheduling 78% of eligible families for a visit and completing 85% of scheduled visits. Overall, 66% of eligible families completed at least one visit. Structural equation modeling (SEM) analyses indicated that high demographic risk and low infant health risk were predictive of scheduling a visit. Both low demographic and infant health risk were predictive of visit completion. Findings suggest that while higher demographic risk increases families' initial engagement, it might also inhibit their follow-through. Additionally, parents of medically at-risk infants may be particularly difficult to engage in universal home visiting interventions. Implications for recruitment strategies of home visiting programs are discussed. Copyright © 2013 Elsevier Ltd. All rights reserved.
Game injuries in relation to game schedules in the National Basketball Association.
Teramoto, Masaru; Cross, Chad L; Cushman, Daniel M; Maak, Travis G; Petron, David J; Willick, Stuart E
2017-03-01
Injury management is critical in the National Basketball Association (NBA), as players experience a wide variety of injuries. Recently, it has been suggested that game schedules, such as back-to-back games and four games in five days, increase the risk of injuries in the NBA. The aim of this study was to examine the association between game schedules and player injuries in the NBA. Descriptive epidemiology study. The present study analyzed game injuries and game schedules in the 2012-13 through 2014-15 regular seasons. Game injuries by game schedules and players' profiles were examined using an exact binomial test, the Fisher's exact test and the Mann-Whitney-Wilcoxon test. A Poisson regression analysis was performed to predict the number of game injuries sustained by each player from game schedules and injured players' profiles. There were a total of 681 cases of game injuries sustained by 280 different players during the three years (total N=1443 players). Playing back-to-back games or playing four games in five days alone was not associated with an increased rate of game injuries, whereas a significant positive association was found between game injuries and playing away from home (p<0.05). Playing back-to-back games and away games were significant predictors of frequent game injuries (p<0.05). Game schedules could be one factor that impacts the risk of game injuries in the NBA. The findings could be useful for designing optimal game schedules in the NBA as well as helping NBA teams make adjustments to minimize game injuries. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.
Trinkoff, Alison M; Le, Rong; Geiger-Brown, Jeanne; Lipscomb, Jane; Lang, Gary
2006-11-01
Nurses are at very high risk for work-related musculoskeletal injury/disorders (MSD) with low back pain/injury being the most frequently occurring MSD. Nurses are also likely to work extended schedules (long hours, on-call, mandatory overtime, working on days off). The purpose of this study was to examine the relationship of extended work schedules in nurses to MSD. Using a longitudinal, three wave survey of 2,617 registered nurses, Wave 1 work schedule data were related to neck, shoulder, and back (MSD) cases occurring in Waves 2 or 3. Schedule characteristics increasing MSD risk included 13+ hour/days, off-shifts, weekend work, work during time off (while sick, on days off, without breaks), and overtime/on-call. These increases in risk were not explained by psychological demands, but were largely explained by physical demands. Adverse schedules are significantly related to nurse MSD. Healthier schedules, less overtime, and reducing work on days off would minimize risk and recovery time. Copyright (c) 2006 Wiley-Liss, Inc.
Mars Sample Return Orbiter Rapid Architecture Study
NASA Astrophysics Data System (ADS)
Godfrey, A.; Johnson, M.; Stroud, C.
2018-04-01
An overview of rapid systems analysis (mass, risk, and schedule) on 1000s of MSRO configurations to understand key technologies and feasible options. Can we generate enough power? Can we aerobrake in time? Are some technology elements just too risky?
Assessment of the Impact of Scheduled Postmarketing Safety Summary Analyses on Regulatory Actions
Sekine, S; Pinnow, EE; Wu, E; Kurtzig, R; Hall, M; Dal Pan, GJ
2016-01-01
In addition to standard postmarketing drug safety monitoring, Section 915 of the Food and Drug Administration Amendments Act of 2007 (FDAAA) requires the US Food and Drug Administration (FDA) to conduct a summary analysis of adverse event reports to identify risks of a drug or biologic product 18 months after product approval, or after 10,000 patients have used the product, whichever is later. We assessed the extent to which these analyses identified new safety signals and resultant safety-related label changes. Among 458 newly approved products, 300 were the subjects of a scheduled analysis; a new safety signal that resulted in a safety-related label change was found for 11 of these products. Less than 2% of 713 safety-related label changes were based on the scheduled analyses. Our study suggests that the safety summary analyses provide only marginal value over other pharmacovigilance activities. PMID:26853718
A technique for lowering risks during contract negotiations
NASA Technical Reports Server (NTRS)
Lehman, D. H.
1986-01-01
In this day and age of sophisticated weapon and space system procurements, negotiations of the statement of work, technical requirements, and schedule may be as protracted as the negotiation of costs and profit. A major problem facing the program manager during contract negotiations is what affect changes in schedule, technical requirements, and contract terms have on the price. In many instances, after the statement of work has been redrafted, the contractor will be obliged to reprice the work, either on the spot or after a short recess in the negotiations. In this paper, a method for organizing the negotiation process is presented to reduce the risks incurred by the seller. The method is built upon regression analysis and two illustrative examples of its use are provided.
Cost Estimation and Control for Flight Systems
NASA Technical Reports Server (NTRS)
Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)
2002-01-01
Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.
Matching Judicial Supervision to Clients’ Risk Status in Drug Court
Marlowe, Douglas B.; Festinger, David S.; Lee, Patricia A.; Dugosh, Karen L.; Benasutti, Kathleen M.
2007-01-01
This article reports outcomes from a program of experimental research evaluating the risk principle in drug courts. Prior studies revealed that participants who were high risk and had (a) antisocial personality disorder or (b) a prior history of drug abuse treatment performed better in drug court when scheduled to attend biweekly judicial status hearings in court. In contrast, participants who were low risk performed equivalently regardless of the court hearings schedule. This study prospectively matches drug court clients to the optimal schedule of court hearings based on an assessment of their risk status and compares outcomes to clients randomly assigned to the standard hearings schedule. Results confirmed that participants who were high risk and matched to biweekly hearings had better during-treatment outcomes than participants assigned to status hearings as usual. These findings provide confirmation of the risk principle in drug courts and yield practical information for enhancing the efficacy and cost-efficiency of drug courts. PMID:18174915
Shift work and diabetes mellitus: a meta-analysis of observational studies.
Gan, Yong; Yang, Chen; Tong, Xinyue; Sun, Huilian; Cong, Yingjie; Yin, Xiaoxu; Li, Liqing; Cao, Shiyi; Dong, Xiaoxin; Gong, Yanhong; Shi, Oumin; Deng, Jian; Bi, Huashan; Lu, Zuxun
2015-01-01
Observational studies suggest that shift work may be associated with diabetes mellitus (DM). However, the results are inconsistent. No systematic reviews have applied quantitative techniques to compute summary risk estimates. To conduct a meta-analysis of observational studies assessing the association between shift work and the risk of DM. Relevant studies were identified by a search of PubMed, Embase, Web of Science and ProQuest Dissertation and Theses databases to April 2014. We also reviewed reference lists from retrieved articles. We included observational studies that reported OR with 95% CIs for the association between shift work and the risk of DM. Two authors independently extracted data and assessed the study quality. Twelve studies with 28 independent reports involving 226 652 participants and 14 595 patients with DM were included. A pooled adjusted OR for the association between ever exposure to shift work and DM risk was 1.09 (95% CI 1.05 to 1.12; p=0.014; I(2)=40.9%). Subgroup analyses suggested a stronger association between shift work and DM for men (OR=1.37, 95% CI 1.20 to 1.56) than for women (OR=1.09, 95% CI 1.04 to 1.14) (p for interaction=0.01). All shift work schedules with the exception of mixed shifts and evening shifts were associated with a statistically higher risk of DM than normal daytime schedules, and the difference among those shift work schedules was significant (p for interaction=0.04). Shift work is associated with an increased risk of DM. The increase was significantly higher among men and the rotating shift group, which warrants further studies. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach
NASA Technical Reports Server (NTRS)
Lee, Lydia L.; Ingegneri, Antonino J.; Djam, Melody
2006-01-01
The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.
Heinrich, Sebastian; Ackermann, Andreas; Prottengeier, Johannes; Castellanos, Ixchel; Schmidt, Joachim; Schüttler, Jürgen
2015-12-01
Former analyses reported an increased rate of poor direct laryngoscopy view in cardiac surgery patients; however, these findings frequently could be attributed to confounding patient characteristics. In most of the reported cardiac surgery cohorts, the rate of well-known risk factors for poor direct laryngoscopy view such as male sex, obesity, or older age, were increased compared with the control groups. Especially in the ongoing debate on anesthesia staff qualification for cardiac interventions outside the operating room a detailed and stratified risk analysis seems necessary. Retrospective, anonymous, propensity score-based, matched-pair analysis. Single-center study in a university hospital. No active participants. Retrospective, anonymous chart analysis. The anesthesia records of patients undergoing cardiac surgery in a period of 6 consecutive years were analyzed retrospectively. The results were compared with those of a control group of patients who underwent general surgery. Poor laryngoscopic view was defined as Cormack and Lehane classification grade 3 or 4. The records of 21,561 general anesthesia procedures were reviewed for the study. The incidence of poor direct laryngoscopic views in patients scheduled for cardiac surgery was significantly increased compared with those of the general surgery cohort (7% v 4.2%). Using propensity score-based matched-pair analysis, equal subgroups were generated of each surgical department, with 2,946 patients showing identical demographic characteristics. After stratifying for demographic characteristics, the rate of poor direct laryngoscopy view remained statistically significantly higher in the cardiac surgery group (7.5% v 5.7%). Even with stratification for demographic risk factors, cardiac surgery patients showed a significantly higher rate of poor direct laryngoscopic view compared with general surgery patients. These results should be taken into account for human resource management and distribution of difficult airway equipment, especially when cardiac interventional programs are implemented in remote hospital locations. Copyright © 2015 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rosa, R.R.; Colligan, M.J.; Lewis, P.
1986-06-01
A newly instituted 3 to 4 day/12-hr rotating shift schedule was compared to the previous 5 to 7 day/8-hr schedule using standard laboratory-type measures of performance and alertness, and a questionnaire on sleep patterns and other personal habits. After seven months adaptation to the new schedule, a preliminary analysis indicates that there were some decrements in alertness, reductions in sleep, and disruptions of other personal activities during 12-hr workdays. Gastro-intestinal state improved during night shift, however, and increases in self-reported stress were reduced by the shortened workweek. These results are discussed in terms of trade-offs between longer workdays and shortermore » workweeks. It is emphasized that at this time no determination can be made of the extent of risk associated with these changes in alertness.« less
NASA Astrophysics Data System (ADS)
Zeng, Yajun; Skibniewski, Miroslaw J.
2013-08-01
Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.
Best Practices for Fatigue Risk Management in Non-Traditional Shiftwork
NASA Technical Reports Server (NTRS)
Flynn-Evans, Erin E.
2016-01-01
Fatigue risk management programs provide effective tools to mitigate fatigue among shift workers. Although such programs are effective for typical shiftwork scenarios, where individuals of equal skill level can be divided into shifts to cover 24 hour operations, traditional programs are not sufficient for managing sleep loss among individuals with unique skill sets, in occupations where non-traditional schedules are required. Such operations are prevalent at NASA and in other high stress occupations, including among airline pilots, military personnel, and expeditioners. These types of operations require fatigue risk management programs tailored to the specific requirements of the mission. Without appropriately tailored fatigue risk management, such operations can lead to an elevated risk of operational failure, disintegration of teamwork, and increased risk of accidents and incidents. In order to design schedules for such operations, schedule planners must evaluate the impact of a given operation on circadian misalignment, acute sleep loss, chronic sleep loss and sleep inertia. In addition, individual-level factors such as morningness-eveningness preference and sleep disorders should be considered. After the impact of each of these factors has been identified, scheduling teams can design schedules that meet operational requirements, while also minimizing fatigue.
Alvarado, Michelle; Ntaimo, Lewis
2018-03-01
Oncology clinics are often burdened with scheduling large volumes of cancer patients for chemotherapy treatments under limited resources such as the number of nurses and chairs. These cancer patients require a series of appointments over several weeks or months and the timing of these appointments is critical to the treatment's effectiveness. Additionally, the appointment duration, the acuity levels of each appointment, and the availability of clinic nurses are uncertain. The timing constraints, stochastic parameters, rising treatment costs, and increased demand of outpatient oncology clinic services motivate the need for efficient appointment schedules and clinic operations. In this paper, we develop three mean-risk stochastic integer programming (SIP) models, referred to as SIP-CHEMO, for the problem of scheduling individual chemotherapy patient appointments and resources. These mean-risk models are presented and an algorithm is devised to improve computational speed. Computational results were conducted using a simulation model and results indicate that the risk-averse SIP-CHEMO model with the expected excess mean-risk measure can decrease patient waiting times and nurse overtime when compared to deterministic scheduling algorithms by 42 % and 27 %, respectively.
Oh, Jae-Il; Yim, Hyeon Woo
2018-02-07
This study aimed to analyze the association between the shift work schedule and metabolic syndrome (MetS). This is a retrospective longitudinal study based on the 2015 health checkup data of 2,090 workers evaluated for MetS in 2010 at a general hospital in Korea. The participants were divided according to their shift work schedule into daytime, three-shift (8-h rotation), and two-shift (12-h rotation) workers. The index that indicates the association between the shift work schedule and MetS is the odds ratio (OR) calculated using multivariate logistic regression. The analysis for the entire group of workers indicated that there was positive association between two-shift rotation and MetS (OR=1.58, 95% confidence interval [CI]: 1.09, 2.29). In the analysis of rotating night-shift workers, the years of rotating night shifts, frequency of night-shift work, and sleep disturbance were added to the confounding variables, and two-shift work remained positively associated with MetS (OR=1.72, 95% CI: 1.10, 2.70). The risk of MetS differs based on the shift work schedules they engage in. Hence, structural changes to the shift work schedules are required to prevent MetS in night-shift workers.
OH, Jae-Il; YIM, Hyeon Woo
2017-01-01
This study aimed to analyze the association between the shift work schedule and metabolic syndrome (MetS). This is a retrospective longitudinal study based on the 2015 health checkup data of 2,090 workers evaluated for MetS in 2010 at a general hospital in Korea. The participants were divided according to their shift work schedule into daytime, three-shift (8-h rotation), and two-shift (12-h rotation) workers. The index that indicates the association between the shift work schedule and MetS is the odds ratio (OR) calculated using multivariate logistic regression. The analysis for the entire group of workers indicated that there was positive association between two-shift rotation and MetS (OR=1.58, 95% confidence interval [CI]: 1.09, 2.29). In the analysis of rotating night-shift workers, the years of rotating night shifts, frequency of night-shift work, and sleep disturbance were added to the confounding variables, and two-shift work remained positively associated with MetS (OR=1.72, 95% CI: 1.10, 2.70). The risk of MetS differs based on the shift work schedules they engage in. Hence, structural changes to the shift work schedules are required to prevent MetS in night-shift workers. PMID:29046489
NASA Technical Reports Server (NTRS)
Zabinsky, J. M.; Burnham, R. W.; Flora, C. C.; Gotlieb, P.; Grande, D. L.; Gunnarson, D. W.; Howard, W. M.; Hunt, D.; Jakubowski, G. W.; Johnson, P. E.
1975-01-01
An assessment of risk, in terms of delivery delays, cost overrun, and performance achievement, associated with the V/STOL technology airplane is presented. The risk is discussed in terms of weight, structure, aerodynamics, propulsion, mechanical drive, and flight controls. The analysis ensures that risks associated with the design and development of the airplane will be eliminated in the course of the program and a useful technology airplane that meets the predicted cost, schedule, and performance can be produced.
NASA Astrophysics Data System (ADS)
Aziz, Fazilah Abdul; Razali, Noraini; Najmiyah Jaafar, Nur
2016-02-01
Currently there are many automotive companies still unable to effectively prevent consequences of poor ergonomics in their manufacturing processes. This study purpose is to determine the surrounding factors that influence low ergonomics risk awareness among staffs at early product development phase in Malaysia automotive industry. In this study there are four variables, low ergonomic risk awareness, inappropriate method and tools, tight development schedule and lack of management support. The survey data were gathered from 245 respondents of local automotive companies in Malaysia. The data was analysed through multiple regression and moderated regression using the IBM SPSS software. Study results revealed that low ergonomic risk awareness has influenced by inappropriate method and tool, and tight development schedule. There were positive linear relationships between low ergonomic risk awareness and inappropriate method and tools, and tight development schedule. The more inappropriate method and tools applied; the lower their ergonomic risk awareness. The more tight development schedule is the lower ergonomic risk awareness. The relationship between low ergonomic risk awareness and inappropriate method and tools depends on staff's age, and education level. Furthermore the relationship between low ergonomic risk awareness and tight development schedule depends on staff's working experience and number of project involvement. The main contribution of this paper was identified the number of factors of low ergonomics risk awareness and offers better understanding on ergonomics among researchers and automotive manufacturer's employees during product development process.
Bannai, Akira; Yoshioka, Eiji; Saijo, Yasuaki; Sasaki, Sachiko; Kishi, Reiko; Tamakoshi, Akiko
2016-01-01
Background The impact of long working hours on diabetes is controversial; however, shift work is known to increase the risk of diabetes. This study aimed to investigate the association between long working hours and diabetes among civil servants in Japan separately by shift work schedules. Methods A prospective cohort study was conducted from April 2003 to March 2009. A total of 3195 men aged ≥35 years who underwent an annual health checkup at baseline were analyzed by shift work schedules (2371 non-shift workers and 824 shift workers). Self-reported working hours were categorized as 35–44 and ≥45 hours per week. The incidence of diabetes was confirmed by fasting plasma glucose concentration ≥126 mg/dL and/or self-reported medical diagnosis of diabetes at the annual checkup. A Cox proportional model was used to calculate hazard ratios (HRs) and 95% confidence intervals (CIs) for developing diabetes associated with long working hours. Results The median follow-up period of non-shift and shift workers was 5.0 and 4.9 years, respectively. During this period, 138 non-shift workers and 46 shift workers developed diabetes. A decreased HR was found among non-shift workers working ≥45 hours per week (HR 0.84; 95% CI, 0.57–1.24); however, shift workers working ≥45 hours per week had a significantly increased risk of diabetes (HR 2.43; 95% CI, 1.21–5.10) compared with those working 35–44 hours per week. An analysis restricted to non-clerical workers also showed similar results. Conclusions The risk of diabetes associated with long working hours differed by shift work schedules. PMID:27001115
Bannai, Akira; Yoshioka, Eiji; Saijo, Yasuaki; Sasaki, Sachiko; Kishi, Reiko; Tamakoshi, Akiko
2016-09-05
The impact of long working hours on diabetes is controversial; however, shift work is known to increase the risk of diabetes. This study aimed to investigate the association between long working hours and diabetes among civil servants in Japan separately by shift work schedules. A prospective cohort study was conducted from April 2003 to March 2009. A total of 3195 men aged ≥35 years who underwent an annual health checkup at baseline were analyzed by shift work schedules (2371 non-shift workers and 824 shift workers). Self-reported working hours were categorized as 35-44 and ≥45 hours per week. The incidence of diabetes was confirmed by fasting plasma glucose concentration ≥126 mg/dL and/or self-reported medical diagnosis of diabetes at the annual checkup. A Cox proportional model was used to calculate hazard ratios (HRs) and 95% confidence intervals (CIs) for developing diabetes associated with long working hours. The median follow-up period of non-shift and shift workers was 5.0 and 4.9 years, respectively. During this period, 138 non-shift workers and 46 shift workers developed diabetes. A decreased HR was found among non-shift workers working ≥45 hours per week (HR 0.84; 95% CI, 0.57-1.24); however, shift workers working ≥45 hours per week had a significantly increased risk of diabetes (HR 2.43; 95% CI, 1.21-5.10) compared with those working 35-44 hours per week. An analysis restricted to non-clerical workers also showed similar results. The risk of diabetes associated with long working hours differed by shift work schedules.
DOE Office of Scientific and Technical Information (OSTI.GOV)
CARLSON, A.B.
The document presents updated results of the preliminary reliability, availability, maintainability analysis performed for delivery of waste feed from tanks 241-AZ-101 and 241-AN-105 to British Nuclear Fuels Limited, inc. under the Tank Waste Remediation System Privatization Contract. The operational schedule delay risk is estimated and contributing factors are discussed.
ERIC Educational Resources Information Center
Cirelli, Christe A.; Sidener, Tina M.; Reeve, Kenneth F.; Reeve, Sharon A.
2016-01-01
The effects of activity schedules on on-task and on-schedule behavior were assessed with two boys at risk for attention-deficit/hyperactivity disorder (ADHD) and referred by their public school teachers as having difficulty during independent work time. On-task behavior increased for both participants after two training sessions. Teachers, peers,…
46 CFR 308.503 - Rate schedules.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Rate schedules. 308.503 Section 308.503 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk... Maritime Administrator at any time without notice. If no rate is published for a voyage on which war risk...
46 CFR 308.503 - Rate schedules.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Rate schedules. 308.503 Section 308.503 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk... Maritime Administrator at any time without notice. If no rate is published for a voyage on which war risk...
46 CFR 308.503 - Rate schedules.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Rate schedules. 308.503 Section 308.503 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk... Maritime Administrator at any time without notice. If no rate is published for a voyage on which war risk...
46 CFR 308.503 - Rate schedules.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Rate schedules. 308.503 Section 308.503 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk... Maritime Administrator at any time without notice. If no rate is published for a voyage on which war risk...
46 CFR 308.503 - Rate schedules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Rate schedules. 308.503 Section 308.503 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk... Maritime Administrator at any time without notice. If no rate is published for a voyage on which war risk...
NASA Astrophysics Data System (ADS)
Huang, J. C.; Wright, W. V.
1982-04-01
The Defense Waste Processing Facility (DWPF) for immobilizing nuclear high level waste (HLW) is scheduled to be built. High level waste is produced when reactor components are subjected to chemical separation operations. Two candidates for immobilizing this HLW are borosilicate glass and crystalline ceramic, either being contained in weld sealed stainless steel canisters. A number of technical analyses are being conducted to support a selection between these two waste forms. The risks associated with the manufacture and interim storage of these two forms in the DWPF are compared. Process information used in the risk analysis was taken primarily from a DWPF processibility analysis. The DWPF environmental analysis provided much of the necessary environmental information.
Franks, Julie; Hirsch-Moverman, Yael; Loquere, Avelino S; Amico, K Rivet; Grant, Robert M; Dye, Bonnie J; Rivera, Yan; Gamboa, Robert; Mannheimer, Sharon B
2018-04-01
The HPTN 067/Alternative Dosing to Augment Pre-Exposure Prophylaxis Pill Taking (ADAPT) study evaluated daily and non-daily dosing schedules for oral pre-exposure prophylaxis (PrEP) to prevent HIV. A qualitative sub-study including focus groups and in-depth interviews was conducted among men who have sex with men participating in New York City to understand their experience with PrEP and study dosing schedules. The 37 sub-study participants were 68% black, 11% white, and 8% Asian; 27% were of Hispanic/Latino ethnicity. Mean age was 34 years. Themes resulting from qualitative analysis include: PrEP is a significant advance for HIV prevention; non-daily dosing of PrEP is congruent with HIV risk; and pervasive stigma connected to HIV and risk behavior is a barrier to PrEP adherence, especially for non-daily dosing schedules. The findings underscore how PrEP intersects with other HIV prevention practices and highlight the need to understand and address multidimensional stigma related to PrEP use.
Marlowe, Douglas B.; Festinger, David S.; Dugosh, Karen L.; Lee, Patricia A.; Benasutti, Kathleen M.
2007-01-01
This article reports recent findings from a program of experimental research examining the effects of adapting judicial supervision to the risk level of drug-abusing offenders. Prior studies revealed that high-risk participants with (1) antisocial personality disorder or (2) a history of drug abuse treatment performed significantly better in drug court when they were scheduled to attend frequent, bi-weekly judicial status hearings in court. Low-risk participants performed equivalently regardless of the schedule of court hearings. The current study prospectively matched misdemeanor drug court clients to the optimal schedule of court hearings based upon an assessment of their risk status, and compared outcomes to those of clients randomly assigned to the standard schedule of court hearings. Results confirmed that high-risk participants graduated at a higher rate, provided more drug-negative urine specimens at 6 months post-admission, and reported significantly less drug use and alcohol intoxication at 6 months post-admission when they were matched to bi-weekly hearings as compared to the usual schedule of hearings. These findings yield practical information for enhancing the efficacy and cost-efficiency of drug court services. Directions for future research on adaptive programming for drug offenders are discussed. PMID:17071020
van Rein, N; Biedermann, J S; van der Meer, F J M; Cannegieter, S C; Wiersma, N; Vermaas, H W; Reitsma, P H; Kruip, M J H A; Lijfering, W M
2017-07-01
Essentials Low-molecular-weight-heparins (LMWH) kinetics differ which may result in different bleeding risks. A cohort of 12 934 venous thrombosis patients on LMWH was followed until major bleeding. The absolute major bleeding risk was low among patients registered at the anticoagulation clinic. Once-daily dosing was associated with a lower bleeding risk as compared with twice-daily. Background Low-molecular-weight heparins (LMWHs) are considered members of a class of drugs with similar anticoagulant properties. However, pharmacodynamics and pharmacokinetics between LMWHs differ, which may result in different bleeding risks. As these agents are used by many patients, small differences may lead to a large effect on numbers of major bleeding events. Objectives To determine major bleeding risks for different LMWH agents and dosing schedules. Methods A cohort of acute venous thrombosis patients from four anticoagulation clinics who used an LMWH and a vitamin K antagonist were followed until they ceased LMWH treatment or until major bleeding. Exposures were classified according to different types of LMWHs and for b.i.d. and o.d. use. Cumulative incidences for major bleeding per 1000 patients and risk ratios were calculated and adjusted for study center. Results The study comprised 12 934 patients with a mean age of 59 years; 6218 (48%) were men. The cumulative incidence of major bleeding was 2.5 per 1000 patients (95% confidence interval [CI], 1.7-3.5). Enoxaparin b.i.d. or o.d. was associated with a relative bleeding risk of 1.7 (95% CI, 0.2-17.5) compared with nadroparin o.d. In addition, a nadroparin b.i.d. dosing schedule was associated with a 2.0-fold increased major bleeding risk (95% CI, 0.8-5.1) as compared with a nadroparin o.d. dosing schedule. Conclusions Absolute major bleeding rates were low for all LMWH agents and dosing schedules in a large unselected cohort. Nevertheless, twice-daily dosing with nadroparin appeared to be associated with an increased major bleeding risk as compared with once-daily dosing, as also suggested in a meta-analysis of controlled clinical trials. © 2017 International Society on Thrombosis and Haemostasis.
Shortcuts in complex engineering systems: a principal-agent approach to risk management.
Garber, Russ; Paté-Cornell, Elisabeth
2012-05-01
In this article, we examine the effects of shortcuts in the development of engineered systems through a principal-agent model. We find that occurrences of illicit shortcuts are closely related to the incentive structure and to the level of effort that the agent is willing to expend from the beginning of the project to remain on schedule. Using a probabilistic risk analysis to determine the risks of system failure from these shortcuts, we show how a principal can choose optimal settings (payments, penalties, and inspections) that can deter an agent from cutting corners and maximize the principal's value through increased agent effort. We analyze the problem for an agent with limited liability. We consider first the case where he is risk neutral; we then include the case where he is risk averse. © 2011 Society for Risk Analysis.
Liu, Jie; Guo, Liang; Jiang, Jiping; Jiang, Dexun; Wang, Peng
2017-01-01
In the emergency management relevant to chemical contingency spills, efficiency emergency rescue can be deeply influenced by a reasonable assignment of the available emergency materials to the related risk sources. In this study, an emergency material scheduling model (EMSM) with time-effective and cost-effective objectives is developed to coordinate both allocation and scheduling of the emergency materials. Meanwhile, an improved genetic algorithm (IGA) which includes a revision operation for EMSM is proposed to identify the emergency material scheduling schemes. Then, scenario analysis is used to evaluate optimal emergency rescue scheme under different emergency pollution conditions associated with different threat degrees based on analytic hierarchy process (AHP) method. The whole framework is then applied to a computational experiment based on south-to-north water transfer project in China. The results demonstrate that the developed method not only could guarantee the implementation of the emergency rescue to satisfy the requirements of chemical contingency spills but also help decision makers identify appropriate emergency material scheduling schemes in a balance between time-effective and cost-effective objectives.
Temporal Planning and Management Decision under Risk and Uncertainty.
1987-12-02
scheduled for Guadalajara, Mexico at the annual meeting of Academia Nacional de Ingenieria de Mexico, September 22-24, 1987, also at Belgrade...Policy Analysis, Proceedings. XE Congreso de la Academia Nacional de Ingenieria , Saltillo, Mexico, September 23-26, 1986. (CCS 535) "S lLfs tvxI1__d4
Strategies for SEE Hardness Assurance - From Buy-It-And-Fly-It to Bullet Proof
NASA Technical Reports Server (NTRS)
Ladbury, Ray
2017-01-01
This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risks or worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.
NASA Langley Systems Analysis & Concepts Directorate Technology Assessment/Portfolio Analysis
NASA Technical Reports Server (NTRS)
Cavanaugh, Stephen; Chytka, Trina; Arcara, Phil; Jones, Sharon; Stanley, Doug; Wilhite, Alan W.
2006-01-01
Systems analysis develops and documents candidate mission and architectures, associated system concepts, enabling capabilities and investment strategies to achieve NASA s strategic objectives. The technology assessment process connects the mission and architectures to the investment strategies. In order to successfully implement a technology assessment, there is a need to collect, manipulate, analyze, document, and disseminate technology-related information. Information must be collected and organized on the wide variety of potentially applicable technologies, including: previous research results, key technical parameters and characteristics, technology readiness levels, relationships to other technologies, costs, and potential barriers and risks. This information must be manipulated to facilitate planning and documentation. An assessment is included of the programmatic and technical risks associated with each technology task as well as potential risk mitigation plans. Risks are assessed and tracked in terms of likelihood of the risk occurring and consequences of the risk if it does occur. The risk assessments take into account cost, schedule, and technical risk dimensions. Assessment data must be simplified for presentation to decision makers. The Systems Analysis and Concepts Directorate (SACD) at NASA Langley Research Center has a wealth of experience in performing Technology Assessment and Portfolio Analysis as this has been a business line since 1978.
Minimizing metastatic risk in radiotherapy fractionation schedules
NASA Astrophysics Data System (ADS)
Badri, Hamidreza; Ramakrishnan, Jagdish; Leder, Kevin
2015-11-01
Metastasis is the process by which cells from a primary tumor disperse and form new tumors at distant anatomical locations. The treatment and prevention of metastatic cancer remains an extremely challenging problem. This work introduces a novel biologically motivated objective function to the radiation optimization community that takes into account metastatic risk instead of the status of the primary tumor. In this work, we consider the problem of developing fractionated irradiation schedules that minimize production of metastatic cancer cells while keeping normal tissue damage below an acceptable level. A dynamic programming framework is utilized to determine the optimal fractionation scheme. We evaluated our approach on a breast cancer case using the heart and the lung as organs-at-risk (OAR). For small tumor α /β values, hypo-fractionated schedules were optimal, which is consistent with standard models. However, for relatively larger α /β values, we found the type of schedule depended on various parameters such as the time when metastatic risk was evaluated, the α /β values of the OARs, and the normal tissue sparing factors. Interestingly, in contrast to standard models, hypo-fractionated and semi-hypo-fractionated schedules (large initial doses with doses tapering off with time) were suggested even with large tumor α/β values. Numerical results indicate the potential for significant reduction in metastatic risk.
10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.
Code of Federal Regulations, 2014 CFR
2014-01-01
...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...
10 CFR 52.99 - Inspection during construction; ITAAC schedules and notifications; NRC notices.
Code of Federal Regulations, 2013 CFR
2013-01-01
...; ITAAC schedules and notifications; NRC notices. (a) Licensee schedule for completing inspections, tests... schedule for completing the inspections, tests, or analyses in the ITAAC. The licensee shall submit updates... combined license may proceed at its own risk with design and procurement activities, and a licensee may...
11th Annual CMMI Technology Conference and User Group
2011-11-17
Examples of triggers may include: – Cost performance – Schedule performance – Results of management reviews – Occurrence of the risk • as a...Analysis (PHA) – Method 3 – Through bottom- up analysis of design data (e.g., flow diagrams, Failure Mode Effects and Criticality Analysis (FMECA...of formal reviews and the setting up of delta or follow- up reviews can be used to give the organization more places to look at the products as they
NASA Technical Reports Server (NTRS)
1983-01-01
The technical effort associated with the selection and definition of the recommended SRB-X concept is documented. Included are discussions concerning the trades leading to the selected concept, the analysis that established the concept's basic subsystem characteristics, selected configuration description and performance capabilities, launch site operations and facility needs, development schedule, cost characteristics, risk assessment, and a cursory comparison with other launch systems.
Planning Risk-Based SQC Schedules for Bracketed Operation of Continuous Production Analyzers.
Westgard, James O; Bayat, Hassan; Westgard, Sten A
2018-02-01
To minimize patient risk, "bracketed" statistical quality control (SQC) is recommended in the new CLSI guidelines for SQC (C24-Ed4). Bracketed SQC requires that a QC event both precedes and follows (brackets) a group of patient samples. In optimizing a QC schedule, the frequency of QC or run size becomes an important planning consideration to maintain quality and also facilitate responsive reporting of results from continuous operation of high production analytic systems. Different plans for optimizing a bracketed SQC schedule were investigated on the basis of Parvin's model for patient risk and CLSI C24-Ed4's recommendations for establishing QC schedules. A Sigma-metric run size nomogram was used to evaluate different QC schedules for processes of different sigma performance. For high Sigma performance, an effective SQC approach is to employ a multistage QC procedure utilizing a "startup" design at the beginning of production and a "monitor" design periodically throughout production. Example QC schedules are illustrated for applications with measurement procedures having 6-σ, 5-σ, and 4-σ performance. Continuous production analyzers that demonstrate high σ performance can be effectively controlled with multistage SQC designs that employ a startup QC event followed by periodic monitoring or bracketing QC events. Such designs can be optimized to minimize the risk of harm to patients. © 2017 American Association for Clinical Chemistry.
Incentive-compatible guaranteed renewable health insurance premiums.
Herring, Bradley; Pauly, Mark V
2006-05-01
Theoretical models of guaranteed renewable insurance display front-loaded premium schedules. Such schedules both cover lifetime total claims of low-risk and high-risk individuals and provide an incentive for those who remain low-risk to continue to purchase the policy. Questions have been raised of whether actual individual insurance markets in the US approximate the behavior predicted by these models, both because young consumers may not be able to "afford" front-loading and because insurers may behave strategically in ways that erode the value of protection against risk reclassification. In this paper, the optimal competitive age-based premium schedule for a benchmark guaranteed renewable health insurance policy is estimated using medical expenditure data. Several factors are shown to reduce the amount of front-loading necessary. Indeed, the resulting optimal premium path increases with age. Actual premium paths exhibited by purchasers of individual insurance are close to the optimal renewable schedule we estimate. Finally, consumer utility associated with the feature is examined.
Big Software for SmallSats: Adapting CFS to CubeSat Missions
NASA Technical Reports Server (NTRS)
Cudmore, Alan P.; Crum, Gary; Sheikh, Salman; Marshall, James
2015-01-01
Expanding capabilities and mission objectives for SmallSats and CubeSats is driving the need for reliable, reusable, and robust flight software. While missions are becoming more complicated and the scientific goals more ambitious, the level of acceptable risk has decreased. Design challenges are further compounded by budget and schedule constraints that have not kept pace. NASA's Core Flight Software System (cFS) is an open source solution which enables teams to build flagship satellite level flight software within a CubeSat schedule and budget. NASA originally developed cFS to reduce mission and schedule risk for flagship satellite missions by increasing code reuse and reliability. The Lunar Reconnaissance Orbiter, which launched in 2009, was the first of a growing list of Class B rated missions to use cFS. Large parts of cFS are now open source, which has spurred adoption outside of NASA. This paper reports on the experiences of two teams using cFS for current CubeSat missions. The performance overheads of cFS are quantified, and the reusability of code between missions is discussed. The analysis shows that cFS is well suited to use on CubeSats and demonstrates the portability and modularity of cFS code.
Schedule Risks Due to Delays in Advanced Technology Development
NASA Technical Reports Server (NTRS)
Reeves, John D. Jr.; Kayat, Kamal A.; Lim, Evan
2008-01-01
This paper discusses a methodology and modeling capability that probabilistically evaluates the likelihood and impacts of delays in advanced technology development prior to the start of design, development, test, and evaluation (DDT&E) of complex space systems. The challenges of understanding and modeling advanced technology development considerations are first outlined, followed by a discussion of the problem in the context of lunar surface architecture analysis. The current and planned methodologies to address the problem are then presented along with sample analyses and results. The methodology discussed herein provides decision-makers a thorough understanding of the schedule impacts resulting from the inclusion of various enabling advanced technology assumptions within system design.
[Labour factors associated with post-traumatic stress in uniformed workers in Medellín].
González-Penagos, Catalina; Moreno-Bedoya, Juan P; Berbesi-Fernández, Dedsy Y; Segura-Cardona, Angela M
2013-01-01
Determining the labor factors associated with post-traumatic stress in uniformed workers in Medellin. A cross-sectional study was made of 124 uniformed workers aged 20 to 48 years-old. A survey was made using an adults' post-traumatic stress instrument which had been validated in Medellin. Statistical analysis was carried out. Post-traumatic stress disorder risk prevalence was 52.2 %. Multivariate analysis showed that the highest risk situations were those related to previous mental health diagnosis (PR=7.67), working schedule (4.24), violent episodes (PR=3.59) and community relationships (PR=2.73). A person's current labor situation seemed to be a risk factor for developing post-traumatic stress in the target population.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-28
... DEPARTMENT OF THE TREASURY Fiscal Service Financial Management Service Proposed Collection of Information: Schedule of Excess Risks AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Notice and request for comments. SUMMARY: The Financial Management Service, as part of its continuing...
Mozessohn, Lee; Cheung, Matthew C; Fallahpour, Saber; Gill, Tripat; Maloul, Asmaa; Zhang, Liying; Lau, Olivia; Buckstein, Rena
2018-06-01
The outcome of myelodysplastic syndrome (MDS) patients with uniformly higher-risk disease treated with azacitidine (AZA) in the 'real-world' remains largely unknown. We evaluated 1101 consecutive higher-risk MDS patients (International Prognostic Scoring System intermediate-2/high) and low-blast count acute myeloid leukaemia (AML; 21-30% blasts) patients treated in Ontario, Canada. By dosing schedule, 24·7% received AZA for seven consecutive days, 12·4% for six consecutive days and 62·9% by 5-2-2. Overall, median number of cycles was 6 (range 1-67) and 8 (range 6-14) when restricted to the 692 (63%) patients who received at least 4 cycles. The actuarial median survival was 11·6 months [95% confidence interval (CI) 10·7-12·4) for the entire cohort and 18·0 months (landmark analysis; 95% CI 16·6-19·1 months) for those receiving at least 4 cycles. There was no difference in overall survival (OS) between the 3 dosing schedules (P = 0·87). In our large 'real-world' evaluation of AZA in higher-risk MDS/low-blast count AML, we demonstrated a lower than expected OS. Reassuringly, survival did not differ by dosing schedules. The OS was higher in the 2/3 of patients who received at least 4 cycles of treatment, reinforcing the necessity of sustained administration until therapeutic benefits are realised. This represents the largest 'real-world' evaluation of AZA in higher-risk MDS/low-blast count AML. © 2018 John Wiley & Sons Ltd.
General risks for tunnelling projects: An overview
NASA Astrophysics Data System (ADS)
Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda
2017-10-01
Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.
An Example of Risk Informed Design
NASA Technical Reports Server (NTRS)
Banke, Rick; Grant, Warren; Wilson, Paul
2014-01-01
NASA Engineering requested a Probabilistic Risk Assessment (PRA) to compare the difference in the risk of Loss of Crew (LOC) and Loss of Mission (LOM) between different designs of a fluid assembly. They were concerned that the configuration favored by the design team was more susceptible to leakage than a second proposed design, but realized that a quantitative analysis to compare the risks between the two designs might strengthen their argument. The analysis showed that while the second design did help improve the probability of LOC, it did not help from a probability of LOM perspective. This drove the analysis team to propose a minor design change that would drive the probability of LOM down considerably. The analysis also demonstrated that there was another major risk driver that was not immediately obvious from a typical engineering study of the design and was therefore unexpected. None of the proposed alternatives were addressing this risk. This type of trade study demonstrates the importance of performing a PRA in order to completely understand a system's design. It allows managers to use risk as another one of the commodities (e.g., mass, cost, schedule, fault tolerance) that can be traded early in the design of a new system.
Overview and Status of the Bioastronautics Critical Path Roadmap (BCPR)
NASA Technical Reports Server (NTRS)
Charles, John
2004-01-01
Viewgraphs on the status and overview of the Bioastronautics Critical Path Roadmap (BCPR) are presented. The topics include: 1) BCPR Objectives; 2) BCPR and OBPR Program Management; 3) BCPR Disciplines & Cross-Cutting Areas; 4) Characteristics of BCPR Reference Missions; 5) Bioastronautics Timetable (notional); 6) BCPR Processes Risk Identification, Assessment, and Management; 7) Types of BCPR Risks; 8) Enabling Questions Categories; 9) Risk Mitigation Status; 10) Defining Levels of Accepted Risk; 11) BCPR Integration; 12) BCPR Implementation, Integration, and Validation; 13) BCPR Refinement Schedule; 14) Academy Review; 15) Rating Bioastronautics Risks; 16) Risk Rating Exercises; 17) Human Health Risk Assessment Criteria (examples); 18) A Recent Risk Rating Exercise; 19) Consensus Workshop Background; 20) Consensus Workshop Rating Analysis; 21) Consensus Workshop Selected Preliminary Recommendations; and 22) Access to BCPR Content.
Car seat safety: Typologies of protective health and safety behaviors for mothers in West Virginia
Thornton, J. Douglas; Deb, Arijita; Murray, Pamela J.; Kelly, Kimberly M.
2016-01-01
Objective Parenting practices differ for a variety of reasons, and three parenting behaviors may be directly influenced by research, policy, and overall parenting trends: car safety seats, vaccination, and breastfeeding. Mothers were categorized in terms of their rear-facing car safety seat utilization and its relationship to other parental health and safety behaviors. Methods A cross-sectional, online survey of mothers of children under 3 years of age (n=124) was conducted. Items assessed mother’s perceived risk and worry about being in an automobile accident, as well as duration of rear-facing car seat utilization. A cluster analysis based on these variables was performed to differentiate the sample into four distinct groups. Outcomes were knowledge of car safety seats, breastfeeding duration, and adherence to vaccination schedules. Results The sample was predominantly White, had an average age of 32 years, had breastfed, and had at least some college education. Two groups of interest had (Group 1) long duration of rear-facing use with low perceived risk and worry and (Group 2) short use with high perceived risk and worry. Fisher’s Exact test indicated Group 1 had higher knowledge of airbag use with car seats (p=0.035), lower intentions to use the recommended vaccinations schedule (p=0.005), and were more likely to breastfeed (p=0.044) for longer duration (p=0.012). Conclusion Propensity for mothers’ risk aversion may be the crucial element in both an appropriate duration of rear-facing car safety seat use and refusal of recommended vaccination schedule. PMID:27435731
Car Seat Safety: Typologies of Protective Health and Safety Behaviors for Mothers in West Virginia.
Thornton, J Douglas; Deb, Arijita; Murray, Pamela J; Kelly, Kimberly M
2017-02-01
Objective Parenting practices differ for a variety of reasons, and three parenting behaviors may be directly influenced by research, policy, and overall parenting trends: car safety seats, vaccination, and breastfeeding. Mothers were categorized in terms of their rear-facing car safety seat utilization and its relationship to other parental health and safety behaviors. Methods A cross-sectional, online survey of mothers of children under 3 years of age (n = 124) was conducted. Items assessed mother's perceived risk and worry about being in an automobile accident, as well as duration of rear-facing car seat utilization. A cluster analysis based on these variables was performed to differentiate the sample into four distinct groups. Outcomes were knowledge of car safety seats, breastfeeding duration, and adherence to vaccination schedules. Results The sample was predominantly White, had an average age of 32 years, had breastfed, and had at least some college education. Two groups of interest had (Group 1) long duration of rear-facing use with low perceived risk and worry and (Group 2) short use with high perceived risk and worry. Fisher's Exact test indicated Group 1 had higher knowledge of airbag use with car seats (p = 0.035), lower intentions to use the recommended vaccinations schedule (p = 0.005), and were more likely to breastfeed (p = 0.044) for longer duration (p = 0.012). Conclusion Propensity for mothers' risk aversion may be the crucial element in both an appropriate duration of rear-facing car safety seat use and refusal of recommended vaccination schedule.
31 CFR 223.14 - Schedules of single risks.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Schedules of single risks. 223.14 Section 223.14 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE SURETY COMPANIES DOING BUSINESS WITH THE...
31 CFR 223.14 - Schedules of single risks.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance:Treasury 2 2013-07-01 2013-07-01 false Schedules of single risks. 223.14 Section 223.14 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE SURETY COMPANIES DOING BUSINESS WITH THE...
31 CFR 223.14 - Schedules of single risks.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false Schedules of single risks. 223.14 Section 223.14 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE SURETY COMPANIES DOING BUSINESS WITH THE...
31 CFR 223.14 - Schedules of single risks.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Schedules of single risks. 223.14 Section 223.14 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE SURETY COMPANIES DOING BUSINESS WITH THE...
31 CFR 223.14 - Schedules of single risks.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 2 2014-07-01 2014-07-01 false Schedules of single risks. 223.14 Section 223.14 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY BUREAU OF THE FISCAL SERVICE SURETY COMPANIES DOING BUSINESS WITH THE...
Turning for Ulcer Reduction (TURN) Study: An Economic Analysis.
Paulden, Mike; Bergstrom, Nancy; Horn, Susan D; Rapp, Mary; Stern, Anita; Barrett, Ryan; Watkiss, Michael; Krahn, Murray
2014-01-01
The Turning for Ulcer Reduction (TURN) study was a multisite, randomized controlled trial that aimed to determine the optimal frequency of turning nursing facility residents with mobility limitations who are at moderate and high risk for pressure ulcer (PrU) development. Here we present data from the economic analysis. This economic analysis aims to estimate the economic consequences for Ontario of switching from a repositioning schedule of 2-hour intervals to a schedule of 3-hour or 4-hour intervals. Costs considered in the analysis included those associated with nursing staff time spent repositioning residents and with incontinent care supplies, which included briefs, barrier cream, and washcloths. The total economic benefit of switching to 3-hour or 4-hour repositioning is estimated to be $11.05 or $16.74 per day, respectively, for every resident at moderate or high risk of developing PrUs. For a typical facility with 123 residents, 41 (33%) of whom are at moderate or high risk of developing PrUs, the total economic benefit is estimated to be $453 daily for 3-hour or $686 daily for 4-hour repositioning. For Ontario as a whole, assuming that there are 77,933 residents at 634 LTC facilities, 25,927 (33%) of whom are at moderate or high risk of developing PrUs, the total economic benefits of switching to 3-hour or 4-hour repositioning are estimated to be $286,420 or $433,913 daily, respectively, equivalent to $104.5 million or $158.4 million per year. We did not consider the savings the Ontario Ministry of Health and Long-Term Care might incur should less frequent repositioning reduce the incidence of work-related injury among nursing staff, so our findings are potentially conservative. A switch to 3-hour or 4-hour repositioning appears likely to yield substantial economic benefits to Ontario without placing residents at greater risk of developing PrUs.
Turning for Ulcer Reduction (TURN) Study: An Economic Analysis
Paulden, Mike; Bergstrom, Nancy; Horn, Susan D.; Rapp, Mary; Stern, Anita; Barrett, Ryan; Watkiss, Michael; Krahn, Murray
2014-01-01
Background The Turning for Ulcer Reduction (TURN) study was a multisite, randomized controlled trial that aimed to determine the optimal frequency of turning nursing facility residents with mobility limitations who are at moderate and high risk for pressure ulcer (PrU) development. Here we present data from the economic analysis. Objectives This economic analysis aims to estimate the economic consequences for Ontario of switching from a repositioning schedule of 2-hour intervals to a schedule of 3-hour or 4-hour intervals. Data Sources Costs considered in the analysis included those associated with nursing staff time spent repositioning residents and with incontinent care supplies, which included briefs, barrier cream, and washcloths. Results The total economic benefit of switching to 3-hour or 4-hour repositioning is estimated to be $11.05 or $16.74 per day, respectively, for every resident at moderate or high risk of developing PrUs. For a typical facility with 123 residents, 41 (33%) of whom are at moderate or high risk of developing PrUs, the total economic benefit is estimated to be $453 daily for 3-hour or $686 daily for 4-hour repositioning. For Ontario as a whole, assuming that there are 77,933 residents at 634 LTC facilities, 25,927 (33%) of whom are at moderate or high risk of developing PrUs, the total economic benefits of switching to 3-hour or 4-hour repositioning are estimated to be $286,420 or $433,913 daily, respectively, equivalent to $104.5 million or $158.4 million per year. Limitations We did not consider the savings the Ontario Ministry of Health and Long-Term Care might incur should less frequent repositioning reduce the incidence of work-related injury among nursing staff, so our findings are potentially conservative. Conclusions A switch to 3-hour or 4-hour repositioning appears likely to yield substantial economic benefits to Ontario without placing residents at greater risk of developing PrUs. PMID:26330894
Executive Overview of SEI MOSAIC: Managing for Success Using a Risk-Based Approach
2007-03-01
and pro - vides the lens through which all potential outcomes are viewed and interpreted. Defining the con - text is thus an essential first step when...Success Analysis and Improvement Crite- ria (SEI MOSAIC)—a suite of advanced analysis methods for assessing complex, distributed pro - grams, processes...achieve that set of objectives, four ac- tivities must be executed in the order shown, while also adhering to any cost and schedule con - straints. Process
NASA Astrophysics Data System (ADS)
Hanish Nithin, Anu; Omenzetter, Piotr
2017-04-01
Optimization of the life-cycle costs and reliability of offshore wind turbines (OWTs) is an area of immense interest due to the widespread increase in wind power generation across the world. Most of the existing studies have used structural reliability and the Bayesian pre-posterior analysis for optimization. This paper proposes an extension to the previous approaches in a framework for probabilistic optimization of the total life-cycle costs and reliability of OWTs by combining the elements of structural reliability/risk analysis (SRA), the Bayesian pre-posterior analysis with optimization through a genetic algorithm (GA). The SRA techniques are adopted to compute the probabilities of damage occurrence and failure associated with the deterioration model. The probabilities are used in the decision tree and are updated using the Bayesian analysis. The output of this framework would determine the optimal structural health monitoring and maintenance schedules to be implemented during the life span of OWTs while maintaining a trade-off between the life-cycle costs and risk of the structural failure. Numerical illustrations with a generic deterioration model for one monitoring exercise in the life cycle of a system are demonstrated. Two case scenarios, namely to build initially an expensive and robust or a cheaper but more quickly deteriorating structures and to adopt expensive monitoring system, are presented to aid in the decision-making process.
A qualitative descriptive study of risk reduction for coronary disease among the Hong Kong Chinese.
Chan, Choi Wan; Lopez, Violeta
2014-01-01
Achieving optimal control and reduction in coronary heart disease (CHD) risks in Hong Kong (HK) remains significant and requires exploring. This article addresses the ability to reduce CHD risks among the HK Chinese. Through secondary analysis, a qualitative descriptive design using focus group interviews and content analysis were adopted. Older and younger adults were invited for the study. An interview schedule was used to guide discussions during focus group interviews. Four categories emerged from the data: planning of health actions, control of risk-reducing behavior, perceived opportunities for understanding CHD, and chest pain appraisal. Local culture and population needs play a central role in disease perception and prevention. The findings are essential to target strategies for initiating health acts for younger adults and establish public education resources that underscore understanding of CHD risk, symptom recognition, and disease management, particularly among those middle-aged and older people at high risk and with the diseased populations. © 2013 Wiley Periodicals, Inc.
Process-based Cost Estimation for Ramjet/Scramjet Engines
NASA Technical Reports Server (NTRS)
Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John
2003-01-01
Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.
Work-leave rotation pattern and incidence of offshore workplace injury.
Massey, S
2018-05-17
Studies on work-leave rotation pattern and work place injuries among offshore oil and gas workers have been few and limited to a 2- or 3-week rotation schedule. To examine incidence of workplace injury in relation to the duration of time into work rotation for extended work schedules up to 24 weeks. Six-year injury data on four offshore installations were extracted. Data were analysed for incidence of injury over time and relative risk using linear trend lines and regression. In total, 311 injuries for 1302 workers were analysed, 39% with rotation schedule of 4 weeks work and 4 weeks rest, 27% 8 weeks work and 4 weeks rest, 23% 16 weeks work and 4 weeks rest and 10% 24 weeks work and 4 weeks rest. Incidence of injury decreased as duration of time into the work rotation increased, corrected for exposure, and this was statistically significant for all rotations in first 4 weeks (P < 0.01). Negative correlation between time offshore and injury was observed in all schedules and consistent for age groups, categories of work, shifts and severity of injury. There was no difference in relative risk of injuries between the four schedules, when corrected for exposure and occupational risk of injury. These results are at variance with previous studies, although no prior study has looked beyond 3-week rotation schedule. Longer offshore schedules are safely possible and this could help decrease manpower and logistics costs for oil and gas companies coping with unprecedented low oil prices.
[Vaccination schedule of the Spanish association of paediatrics: recommendations 2010].
Marès Bermúdez, J; van Esso Arbolave, D; Arístegui Fernández, J; Ruiz Contreras, J; González Hachero, J; Merino Moína, M; Barrio Corrales, F; Alvarez García, F J; Cilleruelo Ortega, M J; Ortigosa Del Castillo, L; Moreno Pérez, D
2010-06-01
The Vaccine Advisory Committee of the Spanish Association of Paediatrics updates annually, the immunization schedule, taking into account epidemiological data, as well as evidence of the effectiveness and efficiency of vaccines. This vaccination schedule includes grades of recommendation. The committee has graded as universal vaccines those that all children should receive, as recommended those with a profile of universal vaccination in childhood and which are desirable that all children receive, but that can be prioritized based on resources for its public funding and for risk groups those targeting groups of people in situations of epidemiological risk. The Committee considers as a priority to achieve a common immunization schedule. The Committee reaffirms the recommendation to include pneumococcal vaccination in the routine vaccination schedule. Vaccination against varicella in the second year of life is an effective strategy and therefore a desirable goal. Vaccination against rotavirus is recommended for all infants given the morbidity and high burden on the health care system. The Committee adheres to the recommendations of the Interterritorial Council of the National Health Care System in reference to routine vaccination against HPV for all girls aged 11 to 14 years and stresses the need to vaccinate against influenza and hepatitis A all patients with risk factors for these diseases. Finally, it stresses the need to update incomplete immunization schedules using accelerated immunization schedules. Copyright 2010 Asociación Española de Pediatría. Published by Elsevier Espana. All rights reserved.
Programmed Multiphasic Health Testing
NASA Technical Reports Server (NTRS)
Hershberg, P. I.
1970-01-01
Multiphase health screening procedures are advocated for detection and prevention of disease at an early stage through risk factor analysis. The use of an automated medical history questionnaire together with scheduled physical examination data provides a scanning input for computer printout. This system makes it possible to process laboratory results from 1,000 to 2,000 patients for biochemical determinations on an economically feasible base.
A Near-Term, High-Confidence Heavy Lift Launch Vehicle
NASA Technical Reports Server (NTRS)
Rothschild, William J.; Talay, Theodore A.
2009-01-01
The use of well understood, legacy elements of the Space Shuttle system could yield a near-term, high-confidence Heavy Lift Launch Vehicle that offers significant performance, reliability, schedule, risk, cost, and work force transition benefits. A side-mount Shuttle-Derived Vehicle (SDV) concept has been defined that has major improvements over previous Shuttle-C concepts. This SDV is shown to carry crew plus large logistics payloads to the ISS, support an operationally efficient and cost effective program of lunar exploration, and offer the potential to support commercial launch operations. This paper provides the latest data and estimates on the configurations, performance, concept of operations, reliability and safety, development schedule, risks, costs, and work force transition opportunities for this optimized side-mount SDV concept. The results presented in this paper have been based on established models and fully validated analysis tools used by the Space Shuttle Program, and are consistent with similar analysis tools commonly used throughout the aerospace industry. While these results serve as a factual basis for comparisons with other launch system architectures, no such comparisons are presented in this paper. The authors welcome comparisons between this optimized SDV and other Heavy Lift Launch Vehicle concepts.
Failure mode and effects analysis as a performance improvement tool in trauma.
Day, Suzanne; Dalto, Joseph; Fox, Jolene; Turpin, Melinda
2006-01-01
Performance improvement (PI) in the multiple systems injured patient frequently highlights areas for improvement in overall hospital care processes. Failure mode effects analysis (FMEA) is an effective tool to assess and prioritize areas of risk in clinical practice. Failure mode effects analysis is often initiated by a "near-miss" or concern for risk as opposed to a root cause analysis that is initiated solely after a sentinel event. In contrast to a root cause analysis, the FMEA looks more broadly at processes involved in the delivery of care. The purpose of this abstract was to demonstrate the usefulness of FMEA as a PI tool by describing an event and following the event through the healthcare delivery PI processes involved. During routine chart abstraction, a trauma registrar found that an elderly trauma patient admitted with a subdural hematoma inadvertently received heparin during the course of a dialysis treatment. Although heparin use was contraindicated in this patient, there were no sequelae as a result of the error. This case was reviewed by the trauma service PI committee and the quality improvement team, which initiated FMEA. An FMEA of inpatient dialysis process was conducted following this incident. The process included physician, nursing, and allied health representatives involved in dialysis. As part of the process, observations of dialysis treatments and staff interviews were conducted. Observation revealed that nurses generally left the patient's room and did not involve themselves in the dialysis process. A formal patient "pass-off" report was not done. Nurses did not review dialysis orders or reevaluate the treatment plan before treatment. We found that several areas of our current practice placed our patients at risk. 1. The nephrology consult/dialysis communication process was inconsistent. 2. Scheduling of treatments for chronic dialysis patients could occur without a formal consult or order. 3. RNs were not consistently involved in dialysis scheduling, setup, or treatment. 4. Dialysis technicians may exceed scope of practice (taking telephone orders) when scheduling of treatment occurred before consult and written orders. Near-miss events may be overlooked as opportunities for improvement in cases where no harm has come to the patient. As a result of our FMEA investigation, the following recommendations were made to improve hospital care delivery in those trauma patients who require inpatient dialysis: 1. Education of RNs about the dialysis process. 2. Implementation of a formal reporting process between the RN and the dialysis technician before the procedure is initiated. 3. RN supervision of dialysis treatments. 4. Use of a preprinted inpatient dialysis form. 5. Education of dialysis technicians regarding their scope of practice. 6. Improve notification process for scheduling dialysis procedures between units and dialysis coordinator (similar to x-ray scheduling). Our performance improvement focus has broadened to include all reported "near-miss" events in order to improve our healthcare delivery process before an event with sequelae occurs. We have found that using FMEA has greatly increased our ability to facilitate change across all services and departments within the hospital.
The Impact of Early Design Phase Risk Identification Biases on Space System Project Performance
NASA Technical Reports Server (NTRS)
Reeves, John D., Jr.; Eveleigh, Tim; Holzer, Thomas; Sarkani, Shahryar
2012-01-01
Risk identification during the early design phases of complex systems is commonly implemented but often fails to result in the identification of events and circumstances that truly challenge project performance. Inefficiencies in cost and schedule estimation are usually held accountable for cost and schedule overruns, but the true root cause is often the realization of programmatic risks. A deeper understanding of frequent risk identification trends and biases pervasive during space system design and development is needed, for it would lead to improved execution of existing identification processes and methods.
Adamkiewicz, Karolina; Płatek, Anna E; Łęgosz, Paweł; Czerniuk, Maciej R; Małdyk, Paweł; Szymański, Filip M
2018-01-01
Periodontal disease is a chronic disease causing an inflammatory process that affects various organs and is as-sociated with an increased risk of many diseases, including bone and cardiovascular disease. The aim of this study was to establish the prevalence of periodontal disease in continuous patients scheduled for hip or knee replacement surgery. The study was a prospective, epidemiological analysis performed in consecutive patients scheduled for total joint (hip or knee) replacement surgery. Patients enrolled into the study were screened for classical risk factors and had a dental evaluation performed for the diagnosis of periodontal disease. The study population consisted of 228 patients. A total of 137 (60.1%) patients were scheduled for a hip replace-ment surgery, while 91 (39.9%) had a knee replacement. The mean age of the study population was 66.8 ± 12.2 years, and 83 (36.4%) patients were male. A clinically significant disease was present in 65 (28.5%) cases, while all (100%) of the patients had at least minimal signs of periodontal disease. In patients with periodontal disease the percentage of tartar involvement of the teeth was 33.1 ± 26.8%, mean dental plaque coverage was 48.1 ± 29.8%, and bleeding occurred at a rate of 35.4 ± 29%. As for the hygiene level, it was generally poor in the majority of patients with periodontal disease. No differences in terms of baseline risk factors were present between patients with and without periodontal disease. In conclusion, periodontal diseases are highly prevalent in patients undergoing hip and/or knee replacement surgery. The presence of the periodontal disease is possibly associated with a worse prognosis and should be treated.
A Pilot Study of Reasons and Risk Factors for "No-Shows" in a Pediatric Neurology Clinic.
Guzek, Lindsay M; Fadel, William F; Golomb, Meredith R
2015-09-01
Missed clinic appointments lead to decreased patient access, worse patient outcomes, and increased healthcare costs. The goal of this pilot study was to identify reasons for and risk factors associated with missed pediatric neurology outpatient appointments ("no-shows"). This was a prospective cohort study of patients scheduled for 1 week of clinic. Data on patient clinical and demographic information were collected by record review; data on reasons for missed appointments were collected by phone interviews. Univariate and multivariate analyses were conducted using chi-square tests and multiple logistic regression to assess risk factors for missed appointments. Fifty-nine (25%) of 236 scheduled patients were no-shows. Scheduling conflicts (25.9%) and forgetting (20.4%) were the most common reasons for missed appointments. When controlling for confounding factors in the logistic regression, Medicaid (odds ratio 2.36), distance from clinic, and time since appointment was scheduled were associated with missed appointments. Further work in this area is needed. © The Author(s) 2014.
Human Neonatal Rotavirus Vaccine (RV3-BB) to Target Rotavirus from Birth.
Bines, Julie E; At Thobari, Jarir; Satria, Cahya Dewi; Handley, Amanda; Watts, Emma; Cowley, Daniel; Nirwati, Hera; Ackland, James; Standish, Jane; Justice, Frances; Byars, Gabrielle; Lee, Katherine J; Barnes, Graeme L; Bachtiar, Novilia S; Viska Icanervilia, Ajeng; Boniface, Karen; Bogdanovic-Sakran, Nada; Pavlic, Daniel; Bishop, Ruth F; Kirkwood, Carl D; Buttery, Jim P; Soenarto, Yati
2018-02-22
A strategy of administering a neonatal rotavirus vaccine at birth to target early prevention of rotavirus gastroenteritis may address some of the barriers to global implementation of a rotavirus vaccine. We conducted a randomized, double-blind, placebo-controlled trial in Indonesia to evaluate the efficacy of an oral human neonatal rotavirus vaccine (RV3-BB) in preventing rotavirus gastroenteritis. Healthy newborns received three doses of RV3-BB, administered according to a neonatal schedule (0 to 5 days, 8 weeks, and 14 weeks of age) or an infant schedule (8 weeks, 14 weeks, and 18 weeks of age), or placebo. The primary analysis was conducted in the per-protocol population, which included only participants who received all four doses of vaccine or placebo within the visit windows, with secondary analyses performed in the intention-to-treat population, which included all participants who underwent randomization. Among the 1513 participants in the per-protocol population, severe rotavirus gastroenteritis occurred up to the age of 18 months in 5.6% of the participants in the placebo group (28 of 504 babies), in 1.4% in the neonatal-schedule vaccine group (7 of 498), and in 2.7% in the infant-schedule vaccine group (14 of 511). This resulted in a vaccine efficacy of 75% (95% confidence interval [CI], 44 to 91) in the neonatal-schedule group (P<0.001), 51% (95% CI, 7 to 76) in the infant-schedule group (P=0.03), and 63% (95% CI, 34 to 80) in the neonatal-schedule and infant-schedule groups combined (combined vaccine group) (P<0.001). Similar results were observed in the intention-to-treat analysis (1649 participants); the vaccine efficacy was 68% (95% CI, 35 to 86) in the neonatal-schedule group (P=0.001), 52% (95% CI, 11 to 76) in the infant-schedule group (P=0.02), and 60% (95% CI, 31 to 76) in the combined vaccine group (P<0.001). Vaccine response, as evidenced by serum immune response or shedding of RV3-BB in the stool, occurred in 78 of 83 participants (94%) in the neonatal-schedule group and in 83 of 84 participants (99%) in the infant-schedule group. The incidence of adverse events was similar across the groups. No episodes of intussusception occurred within the 21-day risk period after administration of any dose of vaccine or placebo, and one episode of intussusception occurred 114 days after the third dose of vaccine in the infant-schedule group. RV3-BB was efficacious in preventing severe rotavirus gastroenteritis when administered according to a neonatal or an infant schedule in Indonesia. (Funded by the Bill and Melinda Gates Foundation and others; Australian New Zealand Clinical Trials Registry number, ACTRN12612001282875 .).
A Program Master Schedule Can Improve Results
2014-02-01
A Program Master Schedule Can Improve Results Patrick K. Barker “There cannot be a crisis today; my schedule is already full.” —Henry Kissinger...often necessary—for clear communication . However, over-reliance on eye-pleasing graphics risks projecting a false impression of SA over a dy- namic...for poor scheduling discipline, lack of believability and/or poor communication . As the saying goes, garbage in equals garbage out. On the other
Working on Sundays–effects on safety, health, and work-life balance.
Wirtz, Anna; Nachreiner, Friedhelm; Rolfes, Katharina
2011-05-01
Several attributes of the work schedule can increase the risk of occupational injuries and accidents, health impairments, and reduced social participation. Although previous studies mainly focused on the effects of shiftwork and long working hours on employee health and safety, there is little evidence of a potential negative impact of working Sundays on the incidence of occupational accidents, health impairments, and work-life balance. A representative sample of employed workers in 31 member and associated states of the European Union (n = 23,934) served as the database for a cross-sectional analysis. The sample was collected via face-to-face interviews in the year 2005. The association of the risks of occupational accidents, health impairments, and decreases in work-life balance with working Sundays was calculated using logistic regression models, controlling for potential confounders, such as shiftwork, workload, and demographic characteristics. The results indicated that working one or more Sundays/month was associated with increase both in the risk of reporting one or more health impairments (odds ratio [OR]: 1.17, 95% confidence interval [CI]: 1.06-1.29) and poorer work-life balance (OR: 1.15, 95% CI: 1.02-1.28). These effects remained after controlling for potentially confounding factors, such as other work schedule attributes, intensity of physical and mental workload, and individual characteristics. Furthermore, working Sundays was also related to increased risk of occupational accidents within the last year (OR: 1.34, 95% CI: 1.03-1.73). Controlling again for individual, workload, and working-time characteristics, a significant association with accident risk, however, remained only in work sectors with low a priori risk of occupational accidents (OR: 1.40, 95% CI: 1.02-1.91), although the increased risk could be observed for both medium and high a priori risk sectors working Sundays (without controlling for additional confounders). The results thus indicate that the detrimental effects of working Sundays on safety, health, and social well-being should be taken into account when designing work schedules. The potential hazards to employees' safety, health, and work-life balance, in particular, should be considered in discussions concerning extending work on Sundays in certain sectors, e.g., retail.
Strategies for SEE Hardness Assurance From Buy-It-And-Fly-It to Bullet Proof
NASA Technical Reports Server (NTRS)
Ladbury, Raymond
2017-01-01
This part of the course first outlines the conventional Single Event Effect (SEE), radiation hardness assurance (RHA) approach, which emphasizes mission success. Next, Dr. Ladbury will discuss the challenges posed by new satellite platforms (e.g., cubesats, nanosats, etc.), where cost and schedule receive emphasis equal to if not greater than mission success. These additional pressures, along with growing demands to reduce size, weight and power, coupled with increased performance, drive many projects toward expanding their use of commercial-off-the-shelf (COTS) technologies. While this may reduce direct parts cost and procurement lead times, it undermines many cost-reduction strategies used for conventional SEE RHA and can make radiation testing and analysis one of the most significant risksor worse, a risk neglected altogether. That section will end with some approaches for restoring balance in the troika of mission success, cost, and schedule. This is captured in SEE RHA as risk management: identify the threat, evaluate the threat, and mitigate the threat.
ERIC Educational Resources Information Center
Trice, Toni M.
2017-01-01
Research shows a math achievement gap for at-risk and economically-disadvantaged students in the United States. To address this issue, a Texas school district implemented a 90-minute math block-scheduling program with 8th grade students. Shaped by the academic learning time and social justice theories, the purpose of this quantitative program…
NASA Technical Reports Server (NTRS)
Lee, Alice T.; Gunn, Todd; Pham, Tuan; Ricaldi, Ron
1994-01-01
This handbook documents the three software analysis processes the Space Station Software Analysis team uses to assess space station software, including their backgrounds, theories, tools, and analysis procedures. Potential applications of these analysis results are also presented. The first section describes how software complexity analysis provides quantitative information on code, such as code structure and risk areas, throughout the software life cycle. Software complexity analysis allows an analyst to understand the software structure, identify critical software components, assess risk areas within a software system, identify testing deficiencies, and recommend program improvements. Performing this type of analysis during the early design phases of software development can positively affect the process, and may prevent later, much larger, difficulties. The second section describes how software reliability estimation and prediction analysis, or software reliability, provides a quantitative means to measure the probability of failure-free operation of a computer program, and describes the two tools used by JSC to determine failure rates and design tradeoffs between reliability, costs, performance, and schedule.
Näswall, Katharina; Burt, Christopher D B; Pearce, Megan
2015-01-01
This study investigated the impact of workload demands on perceived job risk using the Job Demand-Control model as a research framework. The primary objective was to test the hypothesis that employee control over work scheduling and overtime would moderate the relationship between workload demands and perceived job risk. Ninety-six participants working in a variety of industries completed measures of workload demands, and of control over work scheduling and overtime, and a measure of perceived job risk. Workload demands predicted higher perceptions of job risk. However, the results also suggest that control over overtime moderated this relationship, where those with the combination of high workload demands and low control over overtime reported higher levels of perceived risk. The results indicate that the JDC model is applicable to safety research. The results suggest that employee control over workload demands is an important variable to consider in terms of managing workplace safety. The present study also points to important areas for future research to explore in order to further understand the connection between demands and safety.
Risk-based maintenance of ethylene oxide production facilities.
Khan, Faisal I; Haddara, Mahmoud R
2004-05-20
This paper discusses a methodology for the design of an optimum inspection and maintenance program. The methodology, called risk-based maintenance (RBM) is based on integrating a reliability approach and a risk assessment strategy to obtain an optimum maintenance schedule. First, the likely equipment failure scenarios are formulated. Out of many likely failure scenarios, the ones, which are most probable, are subjected to a detailed study. Detailed consequence analysis is done for the selected scenarios. Subsequently, these failure scenarios are subjected to a fault tree analysis to determine their probabilities. Finally, risk is computed by combining the results of the consequence and the probability analyses. The calculated risk is compared against known acceptable criteria. The frequencies of the maintenance tasks are obtained by minimizing the estimated risk. A case study involving an ethylene oxide production facility is presented. Out of the five most hazardous units considered, the pipeline used for the transportation of the ethylene is found to have the highest risk. Using available failure data and a lognormal reliability distribution function human health risk factors are calculated. Both societal risk factors and individual risk factors exceeded the acceptable risk criteria. To determine an optimal maintenance interval, a reverse fault tree analysis was used. The maintenance interval was determined such that the original high risk is brought down to an acceptable level. A sensitivity analysis is also undertaken to study the impact of changing the distribution of the reliability model as well as the error in the distribution parameters on the maintenance interval.
Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis
NASA Astrophysics Data System (ADS)
Chou, Hui-Yu; Yang, Jyh-Bin
2017-10-01
The problem of schedule delay commonly occurs in construction projects. The quality of delay analysis depends on the availability of schedule-related information and delay evidence. More information used in delay analysis usually produces more accurate and fair analytical results. How to use innovative techniques to improve the quality of schedule delay analysis results have received much attention recently. As Building Information Modeling (BIM) technique has been quickly developed, using BIM and 4D simulation techniques have been proposed and implemented. Obvious benefits have been achieved especially in identifying and solving construction consequence problems in advance of construction. This study preforms an intensive literature review to discuss the problems encountered in schedule delay analysis and the possibility of using BIM as a tool in developing a BIM-based approach for schedule delay analysis. This study believes that most of the identified problems can be dealt with by BIM technique. Research results could be a fundamental of developing new approaches for resolving schedule delay disputes.
The Necessity of Functional Analysis for Space Exploration Programs
NASA Technical Reports Server (NTRS)
Morris, A. Terry; Breidenthal, Julian C.
2011-01-01
As NASA moves toward expanded commercial spaceflight within its human exploration capability, there is increased emphasis on how to allocate responsibilities between government and commercial organizations to achieve coordinated program objectives. The practice of program-level functional analysis offers an opportunity for improved understanding of collaborative functions among heterogeneous partners. Functional analysis is contrasted with the physical analysis more commonly done at the program level, and is shown to provide theoretical performance, risk, and safety advantages beneficial to a government-commercial partnership. Performance advantages include faster convergence to acceptable system solutions; discovery of superior solutions with higher commonality, greater simplicity and greater parallelism by substituting functional for physical redundancy to achieve robustness and safety goals; and greater organizational cohesion around program objectives. Risk advantages include avoidance of rework by revelation of some kinds of architectural and contractual mismatches before systems are specified, designed, constructed, or integrated; avoidance of cost and schedule growth by more complete and precise specifications of cost and schedule estimates; and higher likelihood of successful integration on the first try. Safety advantages include effective delineation of must-work and must-not-work functions for integrated hazard analysis, the ability to formally demonstrate completeness of safety analyses, and provably correct logic for certification of flight readiness. The key mechanism for realizing these benefits is the development of an inter-functional architecture at the program level, which reveals relationships between top-level system requirements that would otherwise be invisible using only a physical architecture. This paper describes the advantages and pitfalls of functional analysis as a means of coordinating the actions of large heterogeneous organizations for space exploration programs.
Dasgupta, Nabarun; Henningfield, Jack E; Ertischek, Michelle D; Schnoll, Sidney H
2011-12-01
The prescription drugs regulated in the most restrictive controlled substance schedule for those with an approved therapeutic use vary widely in their real world risk of abuse and harm. Opioid analgesics have the highest rates of abuse, overdose death, drug abuse treatment needs and societal costs in comparison to other Schedule II drugs. Stimulants for attention-deficit/hyperactivity disorders (ADHD) account for substantially lower rates of abuse, harm, and public health impact. The scheduling of drugs is determined by the World Health Organization, the United States Food and Drug Administration, and other regulatory agencies, through a quasi-public process that relies heavily on pre-marketing studies that are conducted in highly controlled clinical settings. We propose that it is increasingly in the interest of science-based regulation and public health to recognize and communicate differences among drugs based on their real-world abuse and public health harm using surveillance data. Appropriate differentiation through labeling of drugs that will likely remain in the same schedule could provide powerful incentives for drug development and research, would aid prescriber/patient decision making by informing them of real differences across drugs within a schedule, and may also contribute to public health efforts to reduce drug abuse. There are risks of course, that include inadvertent perceptions that drugs labeled to be lower in risk are not taken as seriously as others in the same category. Challenges such as these, however, can be overcome and should not serve as barriers to objective communications regarding a drug's actual risks. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.
Sidana, Surbhi; Narkhede, Mayur; Elson, Paul; Hastings, Debbie; Faiman, Beth; Valent, Jason; Samaras, Christy; Hamilton, Kimberly; Liu, Hien K.; Smith, Mitchell R.; Reu, Frederic J.
2017-01-01
Introduction Randomized studies have shown that bortezomib (BTZ) can be given weekly via intravenous (IV) route or twice weekly via subcutaneous (SC) route with lower neuropathy risk and no loss of anti-myeloma efficacy compared to original standard IV twice weekly schedule. Weekly SC should therefore yield the best therapeutic index and is widely used but has not been compared to established administration schedules in the context of a clinical trial. Methods Comprehensive electronic medical record review was done for disease control and neuropathy symptoms of 344 consecutive patients who received their first BTZ-containing regimen for myeloma or AL amyloidosis before or after we changed to SC weekly in December 2010. Univariate and multivariable analyses were carried out that adjusted for age, underlying disease, concurrently used anticancer agents, underlying conditions predisposing to neuropathy, and number of prior regimens compared SC weekly to other schedules. Results Fifty-three patients received BTZ SC weekly, 17 SC twice weekly, 127 IV weekly and 147 IV twice weekly. Risk for neuropathy of any grade was higher with other schedules compared to SC weekly (44.3% vs. 26.9%, p = 0.001) while response rate was similar (72.1% vs. 76.6%, respectively, p = 0.15). Multivariable analyses upheld higher neuropathy risk (Odds ratio 2.45, 95% CI 1.26–4.76, p = 0.008) while the likelihood of not achieving a response (= partial response or better) was comparable (Odds ratio 1.25, 95% CI 0.58–2.71, p = 0.56) for other schedules compared to SC weekly, respectively. Lower neuropathy risk translated into longer treatment duration when BTZ was started SC weekly (p = 0.001). Conclusions Weekly SC BTZ has activity comparable to other schedules and causes low rates of neuropathy. PMID:28278302
Sankaridurg, P R; Sharma, S; Willcox, M; Sweeney, D F; Naduvilath, T J; Holden, B A; Rao, G N
1999-05-01
To report the association between colonization of contact lenses with Streptococcus pneumoniae and the observation of corneal infiltrative events in a group of patients wearing disposable hydrogel lenses on an extended-wear schedule. In a prospective clinical trial, 330 patients wore disposable hydrogels on a 6-night extended-wear and replacement schedule. The contact lens, lid, and conjunctival microbiota of these subjects was analyzed at frequent intervals and at the time of an adverse event. Streptococcus pneumoniae was an uncommon isolate and was recovered from only one of the 3,763 conjunctival samples, five (0.1%) of the 3,764 lid samples, and 33 (0.8%) of the 4,315 contact lens samples. Of the 33 lens samples, 10 (30%) were associated with corneal infiltrative events. Many of the events were mild inflammatory responses and resolved rapidly on discontinuation of lens wear. The presence of S. pneumoniae on the contact lens was associated with a significant risk of development of corneal infiltrates (odds ratio, 3.0; p = 0.0227, logistic-regression analysis). Presence of S. pneumoniae on hydrogel lenses is a significant risk factor for the development of corneal infiltrates.
Achieving reutilization of scheduling software through abstraction and generalization
NASA Technical Reports Server (NTRS)
Wilkinson, George J.; Monteleone, Richard A.; Weinstein, Stuart M.; Mohler, Michael G.; Zoch, David R.; Tong, G. Michael
1995-01-01
Reutilization of software is a difficult goal to achieve particularly in complex environments that require advanced software systems. The Request-Oriented Scheduling Engine (ROSE) was developed to create a reusable scheduling system for the diverse scheduling needs of the National Aeronautics and Space Administration (NASA). ROSE is a data-driven scheduler that accepts inputs such as user activities, available resources, timing contraints, and user-defined events, and then produces a conflict-free schedule. To support reutilization, ROSE is designed to be flexible, extensible, and portable. With these design features, applying ROSE to a new scheduling application does not require changing the core scheduling engine, even if the new application requires significantly larger or smaller data sets, customized scheduling algorithms, or software portability. This paper includes a ROSE scheduling system description emphasizing its general-purpose features, reutilization techniques, and tasks for which ROSE reuse provided a low-risk solution with significant cost savings and reduced software development time.
Improved NSGA model for multi objective operation scheduling and its evaluation
NASA Astrophysics Data System (ADS)
Li, Weining; Wang, Fuyu
2017-09-01
Reasonable operation can increase the income of the hospital and improve the patient’s satisfactory level. In this paper, by using multi object operation scheduling method with improved NSGA algorithm, it shortens the operation time, reduces the operation costand lowers the operation risk, the multi-objective optimization model is established for flexible operation scheduling, through the MATLAB simulation method, the Pareto solution is obtained, the standardization of data processing. The optimal scheduling scheme is selected by using entropy weight -Topsis combination method. The results show that the algorithm is feasible to solve the multi-objective operation scheduling problem, and provide a reference for hospital operation scheduling.
2007-07-01
differed in particulars, results indicated that they produced consistent results. This analysis was offered as a first step toward the further...12 sECTION 4: CREw sCHEdUlINg ANAlYsIs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Chapter...Airlines Schedules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 3. Additional Schedules Analysis
This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.
Ford, Alexander C; Khan, Khurram J; Sandborn, William J; Kane, Sunanda V; Moayyedi, Paul
2011-12-01
Maintenance therapy with 5-aminosalicylates (5-ASAs) is recommended in patients with quiescent ulcerative colitis (UC), but compliance rates are low. Once-daily dosing may improve adherence, but impact on the relapse of disease activity is unclear as no previous meta-analysis has studied this issue. MEDLINE, EMBASE, and the Cochrane central register of controlled trials were searched (through April 2011). Eligible randomized controlled trials (RCTs) recruited adults with quiescent UC, and compared once-daily dosing of 5-ASAs with a more frequent dosing schedule of an identical total daily dose of the same 5-ASA drug. Minimum treatment duration was 6 months. Trials reported a dichotomous assessment of relapse of disease activity at last point of follow-up. Data concerning non-compliance and adverse events were extracted, where reported. Effect of once-daily vs. more frequent dosing schedule was reported as relative risk (RR) of relapse with a 95% confidence interval (CI). The search identified 3,061 citations, and seven RCTs containing 2,745 patients were eligible. All RCTs used mesalamine. Relapse rates were not significantly different between once-daily and conventional dosing schedules for mesalamine (RR of relapse=0.94; 95% CI: 0.82-1.08). Non-compliance (RR=0.87; 95% CI: 0.46-1.66) and adverse events were no more likely with once-daily dosing (RR=1.08; 95% CI: 0.97-1.20). Once-daily dosing with mesalamine is as effective as conventional dosing schedules for the prevention of relapse of quiescent UC, although there is no definitive evidence that compliance with once-daily dosing is better. Adverse events occur at a similar frequency.
Analysis and design of gain scheduled control systems. Ph.D. Thesis
NASA Technical Reports Server (NTRS)
Shamma, Jeff S.
1988-01-01
Gain scheduling, as an idea, is to construct a global feedback control system for a time varying and/or nonlinear plant from a collection of local time invariant designs. However in the absence of a sound analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain schedule design. Such an analysis is presented for three types of gain scheduling situations: (1) a linear parameter varying plant scheduling on its exogenous parameters, (2) a nonlinear plant scheduling on a prescribed reference trajectory, and (3) a nonlinear plant scheduling on the current plant output. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled designs, such as the scheduling variable should vary slowly and capture the plants nonlinearities. Finally, an alternate design framework is proposed which removes the slowing varying restriction or gain scheduled systems. This framework addresses some fundamental feedback issues previously ignored in standard gain.
Avallone, Antonio; Pecori, Biagio; Bianco, Franco; Aloj, Luigi; Tatangelo, Fabiana; Romano, Carmela; Granata, Vincenza; Marone, Pietro; Leone, Alessandra; Botti, Gerardo; Petrillo, Antonella; Caracò, Corradina; Iaffaioli, Vincenzo R; Muto, Paolo; Romano, Giovanni; Comella, Pasquale; Budillon, Alfredo; Delrio, Paolo
2015-10-06
We have previously shown that an intensified preoperative regimen including oxaliplatin plus raltitrexed and 5-fluorouracil/folinic acid (OXATOM/FUFA) during preoperative pelvic radiotherapy produced promising results in locally advanced rectal cancer (LARC). Preclinical evidence suggests that the scheduling of bevacizumab may be crucial to optimize its combination with chemo-radiotherapy. This non-randomized, non-comparative, phase II study was conducted in MRI-defined high-risk LARC. Patients received three biweekly cycles of OXATOM/FUFA during RT. Bevacizumab was given 2 weeks before the start of chemo-radiotherapy, and on the same day of chemotherapy for 3 cycles (concomitant-schedule A) or 4 days prior to the first and second cycle of chemotherapy (sequential-schedule B). Primary end point was pathological complete tumor regression (TRG1) rate. The accrual for the concomitant-schedule was early terminated because the number of TRG1 (2 out of 16 patients) was statistically inconsistent with the hypothesis of activity (30%) to be tested. Conversely, the endpoint was reached with the sequential-schedule and the final TRG1 rate among 46 enrolled patients was 50% (95% CI 35%-65%). Neutropenia was the most common grade ≥ 3 toxicity with both schedules, but it was less pronounced with the sequential than concomitant-schedule (30% vs. 44%). Postoperative complications occurred in 8/15 (53%) and 13/46 (28%) patients in schedule A and B, respectively. At 5 year follow-up the probability of PFS and OS was 80% (95%CI, 66%-89%) and 85% (95%CI, 69%-93%), respectively, for the sequential-schedule. These results highlights the relevance of bevacizumab scheduling to optimize its combination with preoperative chemo-radiotherapy in the management of LARC.
Forensic Schedule Analysis of Construction Delay in Military Projects in the Middle East
This research performs forensic schedule analysis of delay factors that impacted recent large-scale military construction projects in the Middle East...The methodologies for analysis are adapted from the Professional Practice Guide to Forensic Schedule Analysis, particularly Method 3.7 Modeled
DOT National Transportation Integrated Search
2010-05-01
This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...
DOT National Transportation Integrated Search
2010-05-01
This report documents the results of a strategic job analysis that examined the job tasks and knowledge, skills, abilities, and other characteristics (KSAOs) needed to perform the job of a work schedule manager. The strategic job analysis compared in...
Ramskov, Daniel; Rasmussen, Sten; Sørensen, Henrik; Parner, Erik Thorlund; Lind, Martin; Nielsen, Rasmus
2018-06-12
Study Design Randomized clinical trial, etiology. Background Training intensity and volume have been proposed to be associated with specific running-related injuries. If such an association exists, secondary preventive measures could be initiated by clinicians based on symptoms of a specific injury diagnosis. Objectives To test the following hypotheses: (i) A running schedule focusing on intensity will increase the risk of sustaining Achilles tendinopathy, gastrocnemius injuries and plantar fasciitis compared with hypothesized volume-related injuries. (ii) A running schedule focusing on running volume will increase the risk of sustaining patellofemoral pain syndrome, iliotibial band syndrome and patellar tendinopathy compared with hypothesized intensity-related injuries. Methods Healthy recreational runners were included in a 24-week follow-up, divided into 8-week preconditioning and 16-week specific focus-training. Participants were randomized to one of two running schedules: Schedule Intensity(Sch-I) or Schedule Volume(Sch-V). Sch-I progressed the amount of high intensity running (≥88% VO2max) each week. Sch-V progressed total weekly running volume. Global positioning system watch or smartphone collected data on running. Running-related injuries were diagnosed based on a clinical examination. Estimates were risk difference (RD) and 95%CI. Results Of 447 runners, a total of 80 sustained an injury (Sch-I n=36; Sch-V n=44). Risk of intensity injuries in Sch-I were: RD 2-weeks =-0.8%[-5.0;3.4]; RD 4-weeks =-0.8%[-6.7;5.1]; RD 8-weeks =-2.0%[-9.2;5.1]; RD 16-weeks =-5.1%[-16.5;6.3]. Risk of volume injuries in Sch-V were: RD 2-weeks =-0.9%[-5.0;3.2]; RD 4-weeks =-2.0%[-7.5;3.5]; RD 8-weeks =-3.2%[-9.1;2.7]; RD 16-weeks =-3.4%[-13.2;6.2]. Conclusion No difference in risk of hypothesized intensity and volume specific running-related injuries exist between running schedules focused on progression in either running intensity or volume. Level of Evidence Etiology, level 1b. J Orthop Sports Phys Ther, Epub 12 Jun 2018. doi:10.2519/jospt.2018.8062.
An Analysis of Research on Block Scheduling
ERIC Educational Resources Information Center
Zepeda, Sally J.; Mayers, R. Stewart
2006-01-01
In this analysis of 58 empirical studies of high school block scheduling, the authors report findings in and across five groupings. Within groups, data were inconsistent regarding whether teachers' practices changed, but teachers believed that staff development was necessary to teach in a block schedule. Block scheduling appeared to increase…
An Analysis of Technology Transition Within the Department of Defense
2010-06-01
relentless adversaries, it is essential that the DoD performs technology transition in a practical yet expedient manner. Time is a critical factor in...themselves, rather than rely on DOD labs to do so—a practice that brings cost and schedule risk since programs may well find themselves addressing problems...that utilized non-traditional, industry practices to abate the difficulties bringing technologies to a suitable maturation state. Albeit these
Meta-analysis on shift work and risks of specific obesity types.
Sun, M; Feng, W; Wang, F; Li, P; Li, Z; Li, M; Tse, G; Vlaanderen, J; Vermeulen, R; Tse, L A
2018-01-01
This systematic review and meta-analysis evaluated the associations between shift work patterns and risks of specific types of obesity. PubMed was searched until March 2017 for observational studies that examined the relationships between shift work patterns and obesity. Odds ratio for obesity was extracted using a fixed-effects or random-effects model. Subgroup meta-analyses were carried out for study design, specific obesity types and characteristics of shift work pattern. A total of 28 studies were included in this meta-analysis. The overall odds ratio of night shift work was 1.23 (95% confidence interval = 1.17-1.29) for risk of obesity/overweight. Cross-sectional studies showed a higher risk of 1.26 than those with the cohort design (risk ratio = 1.10). Shift workers had a higher frequency of developing abdominal obesity (odds ratio = 1.35) than other obesity types. Permanent night workers demonstrated a 29% higher risk than rotating shift workers (odds ratio 1.43 vs. 1.14). This meta-analysis confirmed the risks of night shift work for the development of overweight and obesity with a potential gradient association suggested, especially for abdominal obesity. Modification of working schedules is recommended, particularly for prolonged permanent night work. More accurate and detailed measurements on shift work patterns should be conducted in future research. © 2017 World Obesity Federation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Analysis of work schedules; submissions; FRA... Employees Engaged in Commuter or Intercity Rail Passenger Transportation § 228.407 Analysis of work schedules; submissions; FRA review and approval of submissions; fatigue mitigation plans. (a) Analysis of...
Martin, Jeanne Sophie; Gaudreault, Michael M; Perron, Michel; Laberge, Luc
2016-04-01
Adolescent maturation is associated with delays of the endogenous circadian phase. Consequently, early school schedules may lead to a mismatch between internal and external time, which can be detrimental to adolescent sleep and health. In parallel, chronotype is known to play a role in adolescent health; evening chronotype adolescents are at higher risk for sleep problems and lower academic achievement. In the summer of 2008, Kénogami High School (Saguenay, Canada) was destroyed by fire. Kénogami students were subsequently relocated to Arvida High School (situated 5.3 km away) for the 2008-2009 academic year. A dual school schedule was implemented, with Arvida students attending a morning schedule (0740-1305 h) and Kénogami students an afternoon schedule (1325-1845 h). This study aimed to investigate the effects of such school schedules and chronotype on sleep, light exposure, and daytime functioning. Twenty-four morning and 33 afternoon schedule students wore an actigraph during 7 days to measure sleep and light exposure. Academic achievement was obtained from school. Subjects completed validated questionnaires on daytime sleepiness, psychological distress, social rhythms, school satisfaction, alcohol, and chronotype. Overall, afternoon schedule students had longer sleep duration, lower sleepiness, and lower light exposure than morning schedule students. Evening chronotypes (E-types) reported higher levels of sleepiness than morning chronotypes (M-types) in both morning and afternoon schedules. Furthermore, M-types attending the morning schedule reported higher sleepiness than M-types attending the afternoon schedule. No difference was found between morning and afternoon schedule students with regard to academic achievement, psychological distress, social rhythms, school satisfaction, and alcohol consumption. However, in both schedules, M-type had more regular social rhythms and lower alcohol consumption. In summary, this study emphasizes that an early school schedule is associated with detrimental effects in terms of sleep deprivation and daytime sleepiness, even for M-types. Furthermore, irrespective of school schedule, E-type adolescents face an increased risk for poor daytime functioning. © 2016 The Author(s).
Marqueta de Salas, María; Rodríguez Gómez, Lorena; Enjuto Martínez, Diego; Juárez Soto, José Juan; Martín-Ramiro, José Javier
2017-03-01
Obesity is a public health problem worldwide. The aim of the present study was to determine the association between the type of working schedule and the sleeping hours per day with obesity and overweight. Cross-sectional study of the National Health Survey in 2012. We conducted an analysis of multinomial logistic regression and estimated the rates of possible risk of obesity and overweight versus the normal weight in relation to the type of working schedule and sleeping hours. Obesity among those who worked at night was 17,50% and those who had irregular works was 17,92%. Overweight among those who performed part-time works was 40,81% and 39,17% in night works. The obesity and overweight among those who slept less than six hours a day were 24,42% and 40,99% respectively. Regression analysis logistic showed OR=1,83 (IC95% 1,15-1,75) in irregular works and OR= 1,83 (IC95% 1,59-2,11) in people who slept less than six hours. Whenever overweight and obesity are present, a positive association between irregular jobs and short patterns of rest has been found, but stadistical significance is lost when estimating the OR adjusting the confounding factors.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-04
... (CRM) surcharge data item to the annual schedule, and revise the quarterly schedule to include the... reflect the Market Risk rule's CRM, (6) revising the Credit RWA associated with Credit Valuation...
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2011-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced or heritage systems and the system environment identifies unanticipated issues that result in cost overruns or schedule impacts. The Discovery & New Frontiers (D&NF) Program Office recently studied cost overruns and schedule delays resulting from advanced technology or heritage assumptions for 6 D&NF missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that the cost and schedule growth did not result from technical hurdles requiring significant technology development. Instead, systems engineering processes did not identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement the heritage or advanced technology. This presentation summarizes the study s findings and offers suggestions for improving the project s ability to identify and manage the risks inherent in the technology and heritage design solution.
Fertility drugs, reproductive strategies and ovarian cancer risk.
Tomao, Federica; Lo Russo, Giuseppe; Spinelli, Gian Paolo; Stati, Valeria; Prete, Alessandra Anna; Prinzi, Natalie; Sinjari, Marsela; Vici, Patrizia; Papa, Anselmo; Chiotti, Maria Stefania; Benedetti Panici, Pierluigi; Tomao, Silverio
2014-01-01
Several adverse effects have been related to infertility treatments, such as cancer development. In particular, the relationship between infertility, reproductive strategies, and risk of gynecological cancers has aroused much interest in recent years. The evaluation of cancer risk among women treated for infertility is very complex, mainly because of many factors that can contribute to occurrence of cancer in these patients (including parity status). This article addresses the possible association between the use of fertility treatments and the risk of ovarian cancer, through a scrupulous search of the literature published thus far in this field. Our principal objective was to give more conclusive answers on the question whether the use of fertility drug significantly increases ovarian cancer risk. Our analysis focused on the different types of drugs and different treatment schedules used. This study provides additional insights regarding the long-term relationships between fertility drugs and risk of ovarian cancer.
Linking better shiftwork arrangements with safety and health management systems.
Kogi, Kazutaka
2004-12-01
Various support measures useful for promoting joint change approaches to the improvement of both shiftworking arrangements and safety and health management systems were reviewed. A particular focus was placed on enterprise-level risk reduction measures linking working hours and management systems. Voluntary industry-based guidelines on night and shift work for department stores and the chemical, automobile and electrical equipment industries were examined. Survey results that had led to the compilation of practicable measures to be included in these guidelines were also examined. The common support measures were then compared with ergonomic checkpoints for plant maintenance work involving irregular nightshifts. On the basis of this analysis, a new night and shift work checklist was designed. Both the guidelines and the plant maintenance work checkpoints were found to commonly cover multiple issues including work schedules and various job-related risks. This close link between shiftwork arrangements and risk management was important as shiftworkers in these industries considered teamwork and welfare services to be essential for managing risks associated with night and shift work. Four areas found suitable for participatory improvement by managers and workers were work schedules, ergonomic work tasks, work environment and training. The checklist designed to facilitate participatory change processes covered all these areas. The checklist developed to describe feasible workplace actions was suitable for integration with comprehensive safety and health management systems and offered valuable opportunities for improving working time arrangements and job content together.
van den Biggelaar, Anita H J; Pomat, William; Bosco, Anthony; Phuanukoonnon, Suparat; Devitt, Catherine J; Nadal-Sims, Marie A; Siba, Peter M; Richmond, Peter C; Lehmann, Deborah; Holt, Patrick G
2011-07-26
Concerns about the risk of inducing immune deviation-associated "neonatal tolerance" as described in mice have restricted the widespread adoption of neonatal vaccination. The aim of this study was to demonstrate the immunological feasibility of neonatal pneumococcal conjugate vaccination (PCV) which could potentially protect high-risk infants in resource poor countries against severe pneumococcal disease and mortality in the early critical period of life. Papua New Guinean infants were randomized to be vaccinated with the 7-valent PCV (7vPCV) at birth, 1 and 2 months (neonatal group, n=104) or at 1, 2 and 3 months of age (infant group, n=105), or to not receive 7vPCV at all (control group, n=109). Analysis of vaccine responses at 3 and 9 months of age demonstrated persistently higher type-1 (IFN-γ) and type-2 (IL-5 and IL-13) T-cell responses to the protein carrier CRM(197) and IgG antibody titres to 7vPCV serotypes in children vaccinated with 7vPCV according to either schedule as compared to unvaccinated children. In a comprehensive immuno-phenotypic analysis at 9 months of age, no differences in the quantity or quality of vaccine-specific T cell memory responses were found between neonatal vaccinations versus children given their first PCV dose at one month. Hospitalization rates in the first month of life did not differ between children vaccinated with PCV at birth or not. These findings demonstrate that neonatal 7vPCV vaccination is safe and not associated with immunological tolerance. Neonatal immunisation schedules should therefore be considered in high-risk areas where this may result in improved vaccine coverage and the earliest possible protection against pneumococcal disease and death. Copyright © 2011 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Wang, Liping; Wang, Boquan; Zhang, Pu; Liu, Minghao; Li, Chuangang
2017-06-01
The study of reservoir deterministic optimal operation can improve the utilization rate of water resource and help the hydropower stations develop more reasonable power generation schedules. However, imprecise forecasting inflow may lead to output error and hinder implementation of power generation schedules. In this paper, output error generated by the uncertainty of the forecasting inflow was regarded as a variable to develop a short-term reservoir optimal operation model for reducing operation risk. To accomplish this, the concept of Value at Risk (VaR) was first applied to present the maximum possible loss of power generation schedules, and then an extreme value theory-genetic algorithm (EVT-GA) was proposed to solve the model. The cascade reservoirs of Yalong River Basin in China were selected as a case study to verify the model, according to the results, different assurance rates of schedules can be derived by the model which can present more flexible options for decision makers, and the highest assurance rate can reach 99%, which is much higher than that without considering output error, 48%. In addition, the model can greatly improve the power generation compared with the original reservoir operation scheme under the same confidence level and risk attitude. Therefore, the model proposed in this paper can significantly improve the effectiveness of power generation schedules and provide a more scientific reference for decision makers.
Class start times, sleep, and academic performance in college: a path analysis.
Onyper, Serge V; Thacher, Pamela V; Gilbert, Jack W; Gradess, Samuel G
2012-04-01
Path analysis was used to examine the relationship between class start times, sleep, circadian preference, and academic performance in college-aged adults. Consistent with observations in middle and high school students, college students with later class start times slept longer, experienced less daytime sleepiness, and were less likely to miss class. Chronotype was an important moderator of sleep schedules and daytime functioning; those with morning preference went to bed and woke up earlier and functioned better throughout the day. The benefits of taking later classes did not extend to academic performance, however; grades were somewhat lower in students with predominantly late class schedules. Furthermore, students taking later classes were at greater risk for increased alcohol consumption, and among all the factors affecting academic performance, alcohol misuse exerted the strongest effect. Thus, these results indicate that later class start times in college, while allowing for more sleep, also increase the likelihood of alcohol misuse, ultimately impeding academic success.
Risk Management Concepts and Guidance
1989-03-01
SUMMARY . ,den.ifying risks 5.3 PROGRAMMATIC RISK SUMMARY o Quantifying risk 5.4 SUPPORTABILITY RISK SUMMARY 55 SCHEDULE RISK SUMMARY * Use of tools to...with Life Cycle Cost Estimates," Defense Systems Management School, (Fort Belvoir). 1973. 207. Lieber, R.S., "New Approaches for Quantifying Risk and
Characterization of Tactical Departure Scheduling in the National Airspace System
NASA Technical Reports Server (NTRS)
Capps, Alan; Engelland, Shawn A.
2011-01-01
This paper discusses and analyzes current day utilization and performance of the tactical departure scheduling process in the National Airspace System (NAS) to understand the benefits in improving this process. The analysis used operational air traffic data from over 1,082,000 flights during the month of January, 2011. Specific metrics included the frequency of tactical departure scheduling, site specific variances in the technology's utilization, departure time prediction compliance used in the tactical scheduling process and the performance with which the current system can predict the airborne slot that aircraft are being scheduled into from the airport surface. Operational data analysis described in this paper indicates significant room for improvement exists in the current system primarily in the area of reduced departure time prediction uncertainty. Results indicate that a significant number of tactically scheduled aircraft did not meet their scheduled departure slot due to departure time uncertainty. In addition to missed slots, the operational data analysis identified increased controller workload associated with tactical departures which were subject to traffic management manual re-scheduling or controller swaps. An analysis of achievable levels of departure time prediction accuracy as obtained by a new integrated surface and tactical scheduling tool is provided to assess the benefit it may provide as a solution to the identified shortfalls. A list of NAS facilities which are likely to receive the greatest benefit from the integrated surface and tactical scheduling technology are provided.
Heritage Systems Engineering Lessons from NASA Deep Space Missions
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2010-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for all five missions studied. The cost and schedule growth was not found to be the result of technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the systemwide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study s lessons learned in more detail and offers suggestions for improving the project s ability to identify and manage the technology and heritage risks inherent in the design solution.
Heritage and Advanced Technology Systems Engineering Lessons Learned from NASA Deep Space Missions
NASA Technical Reports Server (NTRS)
Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon
2010-01-01
In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology systems or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced and heritage systems within the spacecraft and mission environment identifies unanticipated technical issues. Resolving these issues often results in cost overruns and schedule impacts. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that optimistic hardware/software inheritance and technology readiness assumptions caused cost and schedule growth for four of the five missions studied. The cost and schedule growth was not found to result from technical hurdles requiring significant technology development. The projects institutional inheritance and technology readiness processes appear to adequately assess technology viability and prevent technical issues from impacting the final mission success. However, the processes do not appear to identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: an inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of development experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement an advanced technology for space flight applications. The paper summarizes the study's lessons learned in more detail and offers suggestions for improving the project's ability to identify and manage the technology and heritage risks inherent in the design solution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biebesheimer, E.
This document, the Standards/Requirements Identification Document (S/RID) Phase I Assessment Corrective Actions/Compliance Schedule Approval Report for the subject facility, contains the corrective actions required to bring the facility into compliance as a result of an Administrative Assessment to determine whether S/RID requirements are fully addressed by existing policies, plans or procedures. These actions are delineated in the Compliance Schedule Approvals which also contain; noncompliances, risks, compensatory measures, schedules for corrective actions, justifications for approval, and resource impacts.
Avallone, Antonio; Pecori, Biagio; Bianco, Franco; Aloj, Luigi; Tatangelo, Fabiana; Romano, Carmela; Granata, Vincenza; Marone, Pietro; Leone, Alessandra; Botti, Gerardo; Petrillo, Antonella; Caracò, Corradina; Iaffaioli, Vincenzo R.; Muto, Paolo; Romano, Giovanni; Comella, Pasquale; Budillon, Alfredo; Delrio, Paolo
2015-01-01
Background We have previously shown that an intensified preoperative regimen including oxaliplatin plus raltitrexed and 5-fluorouracil/folinic acid (OXATOM/FUFA) during preoperative pelvic radiotherapy produced promising results in locally advanced rectal cancer (LARC). Preclinical evidence suggests that the scheduling of bevacizumab may be crucial to optimize its combination with chemo-radiotherapy. Patients and methods This non-randomized, non-comparative, phase II study was conducted in MRI-defined high-risk LARC. Patients received three biweekly cycles of OXATOM/FUFA during RT. Bevacizumab was given 2 weeks before the start of chemo-radiotherapy, and on the same day of chemotherapy for 3 cycles (concomitant-schedule A) or 4 days prior to the first and second cycle of chemotherapy (sequential-schedule B). Primary end point was pathological complete tumor regression (TRG1) rate. Results The accrual for the concomitant-schedule was early terminated because the number of TRG1 (2 out of 16 patients) was statistically inconsistent with the hypothesis of activity (30%) to be tested. Conversely, the endpoint was reached with the sequential-schedule and the final TRG1 rate among 46 enrolled patients was 50% (95% CI 35%–65%). Neutropenia was the most common grade ≥3 toxicity with both schedules, but it was less pronounced with the sequential than concomitant-schedule (30% vs. 44%). Postoperative complications occurred in 8/15 (53%) and 13/46 (28%) patients in schedule A and B, respectively. At 5 year follow-up the probability of PFS and OS was 80% (95%CI, 66%–89%) and 85% (95%CI, 69%–93%), respectively, for the sequential-schedule. Conclusions These results highlights the relevance of bevacizumab scheduling to optimize its combination with preoperative chemo-radiotherapy in the management of LARC. PMID:26320185
Bonde, Jens Peter; Jørgensen, Kristian Tore; Bonzini, Matteo; Palmer, Keith T
2013-07-01
Previous studies have indicated that shift work, long working hours, and prevalent workplace exposures such as lifting, standing, and physical workload increase the risk of miscarriage, but the evidence is conflicting. We conducted a systematic review of original research reports. A search in Medline and EMBASE 1966-2012 identified 30 primary papers reporting the relative risk (RR) of miscarriage according to ≥1 of 5 occupational activities of interest. Following an assessment of completeness of reporting, confounding, and bias, each risk estimate was characterized as more or less likely to be biased. Studies with equivalent measures of exposure were pooled to obtain a weighted common risk estimate. Sensitivity analyses excluded studies most likely to be biased. Working fixed nights was associated with a moderately increased risk of miscarriage (pooled RR 1.51 [95% confidence interval (95% CI) 1.27-1.78, N=5), while working in 3-shift schedules, working for 40-52 hours weekly, lifting >100 kg/day, standing >6-8 hours/day and physical workload were associated with small risk increments, with the pooled RR ranging from 1.12 (3-shift schedule, N=7) to 1.36 (working hours, N=10). RR for working hours and standing became smaller when analyses were restricted to higher quality studies. These largely reassuring findings do not provide a strong case for mandatory restrictions in relation to shift work, long working hours, occupational lifting, standing, and physical workload. Considering the limited evidence base, however, it may be prudent to advise women against work entailing high levels of these exposures and women with at-risk pregnancies should receive tailored individual counseling.
Night shift work, chronotype and prostate cancer risk in the MCC-Spain case-control study.
Papantoniou, Kyriaki; Castaño-Vinyals, Gemma; Espinosa, Ana; Aragonés, Nuria; Pérez-Gómez, Beatriz; Burgos, Javier; Gómez-Acebo, Inés; Llorca, Javier; Peiró, Rosana; Jimenez-Moleón, Jose Juan; Arredondo, Francisco; Tardón, Adonina; Pollan, Marina; Kogevinas, Manolis
2015-09-01
Night shift work has been classified as a probable human carcinogen based on experimental studies and limited human evidence on breast cancer. Evidence on other common cancers, such as prostate cancer, is scarce. Chronotype is an individual characteristic that may relate to night work adaptation. We evaluated night shift work with relation to prostate cancer, taking into account chronotype and disease severity in a population based case-control study in Spain. We included 1,095 prostate cancer cases and 1,388 randomly selected population controls. We collected detailed information on shift schedules (permanent vs. rotating, time schedules, duration, frequency), using lifetime occupational history. Sociodemographic and lifestyle factors were assessed by face-to-face interviews and chronotype through a validated questionnaire. We used unconditional logistic regression analysis adjusting for potential confounders. Subjects who had worked at least for one year in night shift work had a slightly higher prostate cancer risk [Odds Ratio (OR) 1.14; 95%CI 0.94, 1.37] compared with never night workers; this risk increased with longer duration of exposure (≥ 28 years: OR 1.37; 95%CI 1.05, 1.81; p-trend = 0.047). Risks were more pronounced for high risk tumors [D'Amico classification, Relative Risk Ratio (RRR) 1.40; 95%CI 1.05, 1.86], particularly among subjects with longer duration of exposure (≥28 years: RRR 1.63; 95%CI 1.08, 2.45; p-trend = 0.027). Overall risk was higher among subjects with an evening chronotype, but also increased in morning chronotypes after long-term night work. In this large population based study, we found an association between night shift work and prostate cancer particularly for tumors with worse prognosis. © 2014 UICC.
SEU System Analysis: Not Just the Sum of All Parts
NASA Technical Reports Server (NTRS)
Berg, Melanie D.; Label, Kenneth
2014-01-01
Single event upset (SEU) analysis of complex systems is challenging. Currently, system SEU analysis is performed by component level partitioning and then either: the most dominant SEU cross-sections (SEUs) are used in system error rate calculations; or the partition SEUs are summed to eventually obtain a system error rate. In many cases, system error rates are overestimated because these methods generally overlook system level derating factors. The problem with overestimating is that it can cause overdesign and consequently negatively affect the following: cost, schedule, functionality, and validation/verification. The scope of this presentation is to discuss the risks involved with our current scheme of SEU analysis for complex systems; and to provide alternative methods for improvement.
A risk-based auditing process for pharmaceutical manufacturers.
Vargo, Susan; Dana, Bob; Rangavajhula, Vijaya; Rönninger, Stephan
2014-01-01
The purpose of this article is to share ideas on developing a risk-based model for the scheduling of audits (both internal and external). Audits are a key element of a manufacturer's quality system and provide an independent means of evaluating the manufacturer's or the supplier/vendor's compliance status. Suggestions for risk-based scheduling approaches are discussed in the article. Pharmaceutical manufacturers are required to establish and implement a quality system. The quality system is an organizational structure defining responsibilities, procedures, processes, and resources that the manufacturer has established to ensure quality throughout the manufacturing process. Audits are a component of the manufacturer's quality system and provide a systematic and an independent means of evaluating the manufacturer's overall quality system and compliance status. Audits are performed at defined intervals for a specified duration. The intention of the audit process is to focus on key areas within the quality system and may not cover all relevant areas during each audit. In this article, the authors provide suggestions for risk-based scheduling approaches to aid pharmaceutical manufacturers in identifying the key focus areas for an audit.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
Yates, Justin R; Breitenstein, Kerry A; Gunkel, Benjamin T; Hughes, Mallory N; Johnson, Anthony B; Rogers, Katherine K; Shape, Sara M
Risky decision making can be measured using a probability-discounting procedure, in which animals choose between a small, certain reinforcer and a large, uncertain reinforcer. Recent evidence has identified glutamate as a mediator of risky decision making, as blocking the N-methyl-d-aspartate (NMDA) receptor with MK-801 increases preference for a large, uncertain reinforcer. Because the order in which probabilities associated with the large reinforcer can modulate the effects of drugs on choice, the current study determined if NMDA receptor ligands alter probability discounting using ascending and descending schedules. Sixteen rats were trained in a probability-discounting procedure in which the odds against obtaining the large reinforcer increased (n=8) or decreased (n=8) across blocks of trials. Following behavioral training, rats received treatments of the NMDA receptor ligands MK-801 (uncompetitive antagonist; 0, 0.003, 0.01, or 0.03mg/kg), ketamine (uncompetitive antagonist; 0, 1.0, 5.0, or 10.0mg/kg), and ifenprodil (NR2B-selective non-competitive antagonist; 0, 1.0, 3.0, or 10.0mg/kg). Results showed discounting was steeper (indicating increased risk aversion) for rats on an ascending schedule relative to rats on the descending schedule. Furthermore, the effects of MK-801, ketamine, and ifenprodil on discounting were dependent on the schedule used. Specifically, the highest dose of each drug decreased risk taking in rats in the descending schedule, but only MK-801 (0.03mg/kg) increased risk taking in rats on an ascending schedule. These results show that probability presentation order modulates the effects of NMDA receptor ligands on risky decision making. Copyright © 2016 Elsevier Inc. All rights reserved.
Rudin-Brown, Christina M; Harris, Sarah; Rosberg, Ari
2018-02-01
Canada's freight rail system moves 70% of the country's surface goods and almost half of all exports (RAC, 2016). These include dangerous goods. Anonymous survey of freight rail operating employees conducted by the Teamsters Canada Rail Conference (TCRC, 2014) revealed that many do not report getting enough sleep because of their work schedules, and that fatigue may be affecting their performance at work. Besides general impairments in attention and cognitive functioning, fatigue in railway operating employees slows reaction time to safety alarms and impairs conformance to train operating requirements. Shift scheduling practices can contribute to sleep-related fatigue by restricting sleep opportunities, requiring extended periods of wakefulness and by disrupting daily (circadian) rhythms. The primary goal of accident investigation is to identify causal and contributing factors so that similar occurrences can be prevented. A database search of Transportation Safety Board (TSB) rail investigation reports published in the 21-year period from 1995 to 2015 identified 18 that cited sleep-related fatigue of freight rail operating employees as a causal, contributing, or risk finding. This number represents about 20% of TSB rail investigations from the same period in which a human factors aspect of freight train activities was a primary cause. Exploration of accident themes suggests that management of fatigue and shift scheduling in the freight rail industry is a complex issue that is often not conducive to employee circadian rhythms and sleep requirements. It also suggests that current shift scheduling and fatigue management practices may be insufficient to mitigate the associated safety risk. Railway fatigue management systems that are based on the principles of modern sleep science are needed to improve scheduling practices and mitigate the ongoing safety risk. Crown Copyright © 2018. Published by Elsevier Ltd. All rights reserved.
Dembe, A; Erickson, J; Delbos, R; Banks, S
2005-01-01
Aims: To analyse the impact of overtime and extended working hours on the risk of occupational injuries and illnesses among a nationally representative sample of working adults from the United States. Methods: Responses from 10 793 Americans participating in the National Longitudinal Survey of Youth (NLSY) were used to evaluate workers' job histories, work schedules, and occurrence of occupational injury and illness between 1987 and 2000. A total of 110 236 job records were analysed, encompassing 89 729 person-years of accumulated working time. Aggregated incidence rates in each of five exposure categories were calculated for each NLSY survey period. Multivariate analytical techniques were used to estimate the relative risk of long working hours per day, extended hours per week, long commute times, and overtime schedules on reporting a work related injury or illness, after adjusting for age, gender, occupation, industry, and region. Results: After adjusting for those factors, working in jobs with overtime schedules was associated with a 61% higher injury hazard rate compared to jobs without overtime. Working at least 12 hours per day was associated with a 37% increased hazard rate and working at least 60 hours per week was associated with a 23% increased hazard rate. A strong dose-response effect was observed, with the injury rate (per 100 accumulated worker-years in a particular schedule) increasing in correspondence to the number of hours per day (or per week) in the workers' customary schedule. Conclusions: Results suggest that job schedules with long working hours are not more risky merely because they are concentrated in inherently hazardous industries or occupations, or because people working long hours spend more total time "at risk" for a work injury. Strategies to prevent work injuries should consider changes in scheduling practices, job redesign, and health protection programmes for people working in jobs involving overtime and extended hours. PMID:16109814
Dembe, A E; Erickson, J B; Delbos, R G; Banks, S M
2005-09-01
To analyse the impact of overtime and extended working hours on the risk of occupational injuries and illnesses among a nationally representative sample of working adults from the United States. Responses from 10,793 Americans participating in the National Longitudinal Survey of Youth (NLSY) were used to evaluate workers' job histories, work schedules, and occurrence of occupational injury and illness between 1987 and 2000. A total of 110,236 job records were analysed, encompassing 89,729 person-years of accumulated working time. Aggregated incidence rates in each of five exposure categories were calculated for each NLSY survey period. Multivariate analytical techniques were used to estimate the relative risk of long working hours per day, extended hours per week, long commute times, and overtime schedules on reporting a work related injury or illness, after adjusting for age, gender, occupation, industry, and region. After adjusting for those factors, working in jobs with overtime schedules was associated with a 61% higher injury hazard rate compared to jobs without overtime. Working at least 12 hours per day was associated with a 37% increased hazard rate and working at least 60 hours per week was associated with a 23% increased hazard rate. A strong dose-response effect was observed, with the injury rate (per 100 accumulated worker-years in a particular schedule) increasing in correspondence to the number of hours per day (or per week) in the workers' customary schedule. Results suggest that job schedules with long working hours are not more risky merely because they are concentrated in inherently hazardous industries or occupations, or because people working long hours spend more total time "at risk" for a work injury. Strategies to prevent work injuries should consider changes in scheduling practices, job redesign, and health protection programmes for people working in jobs involving overtime and extended hours.
Frequency of Specific Categories of Aviation Accidents and Incidents During 2001-2010
NASA Technical Reports Server (NTRS)
Evans, Joni K.
2014-01-01
The purpose of this study was to determine the types of accidents or incidents that are most important to the aviation safety risk. All accidents and incidents from 2001-2010 were assigned occurrence categories based on the taxonomy developed by the Commercial Aviation Safety Team/International Civil Aviation Organization (CAST/ICAO) Common Taxonomy Team (CICTT). The most frequently recorded categories were selected within each of five metrics: total accidents, fatal accidents, total injuries, fatal injuries and total incidents. This analysis was done separately for events within Part 121, Scheduled Part 135, Non-Scheduled Part 135 and Part 91. Combining those five sets of categories resulted in groups of between seven and eleven occurrence categories, depending on the flight operation. These groups represent 65-85% of all accidents and 68-81% of incidents.
ERIC Educational Resources Information Center
Parks, William Anthony
2013-01-01
In the 1990's there was a movement by high schools to change from a traditional scheduling format to a block scheduling format (Canady & Rettig, 1995) in an effort to improve student achievement. Reports such as "A Nation at Risk" and "Prisoners of Time" indicated time was an important factor (NCEE, 1983; NCTL, 1994). While…
A Systems Engineering Approach for Global Fleet Station Alternatives in the Gulf of Guinea
2007-12-01
Understanding that many types of risk lie within categories such as cost, funding, management, political, production, and schedule , we may apply the... schedule , to the Gulf of Guinea beginning in October of 2007. USS FORT MCHENRY, an amphibious Landing Ship Dock (LSD), affords greater storage...Kerzner, Project Management: A Systems Approach to Planning, Scheduling , and Controlling (New Jersey: John Wiley & Sons, Inc., 2006), 724. 103 5
Kosmadopoulos, Anastasi; Sargent, Charli; Darwent, David; Zhou, Xuan; Dawson, Drew; Roach, Gregory D
2014-12-01
Extended wakefulness, sleep loss, and circadian misalignment are factors associated with an increased accident risk in shiftwork. Splitting shifts into multiple shorter periods per day may mitigate these risks by alleviating prior wake. However, the effect of splitting the sleep-wake schedule on the homeostatic and circadian contributions to neurobehavioural performance and subjective assessments of one's ability to perform are not known. Twenty-nine male participants lived in a time isolation laboratory for 13 d, assigned to one of two 28-h forced desynchrony (FD) schedules. Depending on the assigned schedule, participants were provided the same total time in bed (TIB) each FD cycle, either consolidated into a single period (9.33 h TIB) or split into two equal halves (2 × 4.67 h TIB). Neurobehavioural performance was regularly assessed with a psychomotor vigilance task (PVT) and subjectively-assessed ability was measured with a prediction of performance on a visual analogue scale. Polysomnography was used to assess sleep, and core body temperature was recorded to assess circadian phase. On average, participants obtained the same amount of sleep in both schedules, but those in the split schedule obtained more slow wave sleep (SWS) on FD days. Mixed-effects ANOVAs indicated no overall difference between the standard and split schedules in neurobehavioural performance or predictions of performance. Main effects of circadian phase and prior wake were present for both schedules, such that performance and subjective ratings of ability were best around the circadian acrophase, worst around the nadir, and declined with increasing prior wake. There was a schedule by circadian phase interaction for all neurobehavioural performance metrics such that performance was better in the split schedule than the standard schedule around the nadir. There was no such interaction for predictions of performance. Performance during the standard schedule was significantly better than the split schedule at 2 h of prior wake, but declined at a steeper rate such that the schedules converged by 4.5-7 h of prior wake. Overall, the results indicate that when the total opportunity for sleep per day is satisfactory, a split sleep-wake schedule is not detrimental to sleep or performance. Indeed, though not reflected in subjective assessments of performance capacity, splitting the schedule may be of some benefit, given its reduction of neurobehavioural impairment at night and its association with increased SWS. Therefore, for some industries that require operations to be sustained around the clock, implementing a split work-rest schedule may be of assistance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
Code of Federal Regulations, 2013 CFR
2013-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
Code of Federal Regulations, 2012 CFR
2012-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
1997-06-17
There is Good and Bad News With CMMs8 *bad news: process improvement takes time *good news: the first benefit Is better schedule management With PSP s...e g similar supp v EURO not sudden death toolset for assessment and v EURO => Business benefits detailed analysis) . EURO could collapse (low risk...from SPI live on even after year 2000. Priority BENEFITS Actions * Improved management and application development processes * Strengthened Change
[Immunisation schedule of the Spanish Association of Paediatrics: 2013 recommendations].
Moreno-Pérez, D; Álvarez García, F J; Arístegui Fernández, J; Barrio Corrales, F; Cilleruelo Ortega, M J; Corretger Rauet, J M; González-Hachero, J; Hernández-Sampelayo Matos, T; Merino Moína, M; Ortigosa Del Castillo, L; Ruiz-Contreras, J
2013-01-01
The Advisory Committee on Vaccines of the Spanish Association of Paediatrics (CAV-AEP) updates the immunisation schedule every year, taking into account epidemiological data as well as evidence on the safety, effectiveness and efficiency of vaccines. The present schedule includes levels of recommendation. We have graded as routine vaccinations those that the CAV-AEP consider all children should receive; as recommended those that fit the profile for universal childhood immunisation and would ideally be given to all children, but that can be prioritised according to the resources available for their public funding; and as risk group vaccinations those that specifically target individuals in situations of risk. Immunisation schedules tend to be dynamic and adaptable to ongoing epidemiological changes. Nevertheless, the achievement of a unified immunisation schedule in all regions of Spain is a top priority for the CAV-AEP. Based on the latest epidemiological trends, CAV-AEP follows the innovations proposed in the last year's schedule, such as the administration of the first dose of the MMR and the varicella vaccines at age 12 months and the second dose at age 2-3 years, as well as the administration of the Tdap vaccine at age 4-6 years, always followed by another dose at 11-14 years of age, preferably at 11-12 years. The CAV-AEP believes that the coverage of vaccination against human papillomavirus in girls aged 11-14 years, preferably at 11-12 years, must increase. It reasserts its recommendation to include vaccination against pneumococcal disease in the routine immunisation schedule. Universal vaccination against varicella in the second year of life is an effective strategy and therefore a desirable objective. Vaccination against rotavirus is recommended in all infants due to the morbidity and elevated healthcare burden of the virus. The Committee stresses the need to vaccinate population groups considered at risk against influenza and hepatitis A. Finally, it emphasizes the need to bring incomplete vaccinations up to date following the catch-up immunisation schedule. Copyright © 2012 Asociación Española de Pediatría. Published by Elsevier España, S.L. All rights reserved.
ERIC Educational Resources Information Center
Casey, Sean D.; Cooper-Brown, Linda J.; Wacker, David P.; Rankin, Barbara E.
2006-01-01
The feeding behaviors of a child diagnosed with failure to thrive were assessed using descriptive analysis methodology to identify the schedules of reinforcement provided by the child's parents. This analysis revealed that the child's appropriate feeding behaviors (i.e., bite acceptance, self-feeding) were on a lean schedule of positive…
System for decision analysis support on complex waste management issues
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shropshire, D.E.
1997-10-01
A software system called the Waste Flow Analysis has been developed and applied to complex environmental management processes for the United States Department of Energy (US DOE). The system can evaluate proposed methods of waste retrieval, treatment, storage, transportation, and disposal. Analysts can evaluate various scenarios to see the impacts to waste slows and schedules, costs, and health and safety risks. Decision analysis capabilities have been integrated into the system to help identify preferred alternatives based on a specific objectives may be to maximize the waste moved to final disposition during a given time period, minimize health risks, minimize costs,more » or combinations of objectives. The decision analysis capabilities can support evaluation of large and complex problems rapidly, and under conditions of variable uncertainty. The system is being used to evaluate environmental management strategies to safely disposition wastes in the next ten years and reduce the environmental legacy resulting from nuclear material production over the past forty years.« less
Big Software for SmallSats: Adapting cFS to CubeSat Missions
NASA Technical Reports Server (NTRS)
Cudmore, Alan P.; Crum, Gary Alex; Sheikh, Salman; Marshall, James
2015-01-01
Expanding capabilities and mission objectives for SmallSats and CubeSats is driving the need for reliable, reusable, and robust flight software. While missions are becoming more complicated and the scientific goals more ambitious, the level of acceptable risk has decreased. Design challenges are further compounded by budget and schedule constraints that have not kept pace. NASA's Core Flight Software System (cFS) is an open source solution which enables teams to build flagship satellite level flight software within a CubeSat schedule and budget. NASA originally developed cFS to reduce mission and schedule risk for flagship satellite missions by increasing code reuse and reliability. The Lunar Reconnaissance Orbiter, which launched in 2009, was the first of a growing list of Class B rated missions to use cFS.
Marching to the beat of Moore's Law
NASA Astrophysics Data System (ADS)
Borodovsky, Yan
2006-03-01
Area density scaling in integrated circuits, defined as transistor count per unit area, has followed the famous observation-cum-prediction by Gordon Moore for many generations. Known as "Moore's Law" which predicts density doubling every 18-24 month, it has provided all important synchronizing guidance and reference for tools and materials suppliers, IC manufacturers and their customers as to what minimal requirements their products and services need to meet to satisfy technical and financial expectations in support of the infrastructure required for the development and manufacturing of corresponding technology generation nodes. Multiple lithography solutions are usually under considerations for any given node. In general, three broad classes of solutions are considered: evolutionary - technology that is extension of existing technology infrastructure at similar or slightly higher cost and risk to schedule; revolutionary - technology that discards significant parts of the existing infrastructure at similar cost, higher risk to schedule but promises higher capability as compared to the evolutionary approach; and last but not least, disruptive - approach that as a rule promises similar or better capabilities, much lower cost and wholly unpredictable risk to schedule and products yields. This paper examines various lithography approaches, their respective merits against criteria of respective infrastructure availability, affordability and risk to IC manufacturer's schedules and strategy involved in developing and selecting best solution in an attempt to sort out key factors that will impact the decision on the lithography choice for large-scale manufacturing for the future technology nodes.
Introducing Risk Management Techniques Within Project Based Software Engineering Courses
NASA Astrophysics Data System (ADS)
Port, Daniel; Boehm, Barry
2002-03-01
In 1996, USC switched its core two-semester software engineering course from a hypothetical-project, homework-and-exam course based on the Bloom taxonomy of educational objectives (knowledge, comprehension, application, analysis, synthesis, and evaluation). The revised course is a real-client team-project course based on the CRESST model of learning objectives (content understanding, problem solving, collaboration, communication, and self-regulation). We used the CRESST cognitive demands analysis to determine the necessary student skills required for software risk management and the other major project activities, and have been refining the approach over the last 5 years of experience, including revised versions for one-semester undergraduate and graduate project course at Columbia. This paper summarizes our experiences in evolving the risk management aspects of the project course. These have helped us mature more general techniques such as risk-driven specifications, domain-specific simplifier and complicator lists, and the schedule as an independent variable (SAIV) process model. The largely positive results in terms of review of pass / fail rates, client evaluations, product adoption rates, and hiring manager feedback are summarized as well.
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2012 CFR
2012-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2011 CFR
2011-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees.../Current Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2014 CFR
2014-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2013 CFR
2013-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees... Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time required...
76 FR 33974 - Changes to the Schedule of Operations Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
... doff it afterwards. To minimize the risk of food contamination during inspection and to ensure that... DEPARTMENT OF AGRICULTURE Food Safety and Inspection Service 9 CFR Parts 307, 381, and 590 [Docket No. FSIS-2010-0014] RIN [0583-AD35] Changes to the Schedule of Operations Regulations AGENCY: Food...
20 CFR 10.806 - How are the maximum fees defined?
Code of Federal Regulations, 2010 CFR
2010-04-01
... AMENDED Information for Medical Providers Medical Fee Schedule § 10.806 How are the maximum fees defined? For professional medical services, the Director shall maintain a schedule of maximum allowable fees.../Current Procedural Terminology (HCPCS/CPT) code which represents the relative skill, effort, risk and time...
Risk-Informed Decision Making: Application to Technology Development Alternative Selection
NASA Technical Reports Server (NTRS)
Dezfuli, Homayoon; Maggio, Gaspare; Everett, Christopher
2010-01-01
NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.
MacDonall, James S
2017-09-01
Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable-interval variable-interval schedules to concurrent variable-interval extinction schedules because the contingencies in neither alternative are constant. © 2017 Society for the Experimental Analysis of Behavior.
Scheduling: A guide for program managers
NASA Technical Reports Server (NTRS)
1994-01-01
The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.
NASA Astrophysics Data System (ADS)
Pandzic, K.; Likso, T.
2012-04-01
Conventional Palmer Drought Index (PDI) and recent Standardized Precipitation Index (SPI) for Zagreb Gric Observatory are compared by spectral analysis technique. Data for a period 1862-2010 are used. The results indicate that SPI is simpler for interpretation but PDI more comprehensive index. On the other side, lack of temperature within SPI, make impossible application of it on climate change interpretation. Possible applications of them in irrigation scheduling system is considered as well for drought risk assessment.
Data Analysis and Its Impact on Predicting Schedule & Cost Risk
2006-03-01
variance of the error term by performing a Breusch - Pagan test for constant variance (Neter et al., 1996:239). In order to test the normality of...is constant variance. Using Microsoft Excel®, we calculate a p- 68 value of 0.225678 for the Breusch - Pagan test . We again compare this p-value to...calculate a p-value of 0.121211092 Breusch - Pagan test . We again compare this p-value to an alpha of 0.05 indicating our assumption of constant variance
2012-07-13
completed through SAP -standard templates that are then used for gap analysis as compared to the commercial-off-the-shelf “To-Be” process. The Navy ERP ...13F25-04 4800 Mark Center Drive Alexandria, VA 22350-1500 Acronyms and Abbreviations BPR CMO DAI DCMO DEAMS DLA EBS EC ERP FIAR GAO...overall objective was to evaluate six Enterprise Resource Planning ( ERP ) systems that we identified as necessary for DoD to produce auditable
MATD Operational Phase: Experiences and Lessons Learned
NASA Astrophysics Data System (ADS)
Messidoro, P.; Bader, M.; Brunner, O.; Cerrato, A.; Sembenini, G.
2004-08-01
The Model And Test Effectiveness Database (MATD) initiative is ending the first year of its operational phase. MATD represents a common repository of project data, Assembly Integration and Verification (AIV) data, on ground and flight anomalies data, of recent space projects, and offers, with the application of specific methodologies, the possibility to analyze the collected data in order to improve the test philosophies and the related standards. Basically the following type of results can be derived from the database: - Statistics on ground failures and flight anomalies - Feed-back from the flight anomalies to the Test Philosophies - Test Effectiveness evaluation at system and lower levels - Estimate of the index of effectiveness of a specific Model and Test Philosophy in comparison with the applicable standards - Simulation of different Test philosophies and related balancing of Risk/cost/schedule on the basis of MATD data The paper after a short presentation of the status of the MATD initiative, summarises the most recent lessons learned which are resulting from the data analysis and highlights how MATD is being utilized for the actual risk/cost/schedule/Test effectiveness evaluations of the past programmes so as for the prediction of the new space projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spanos, W.J. Jr.; Clery, M.; Perez, C.A.
1994-07-30
The purpose was to determine late complication incidence for pelvic palliation using accelerated multiple daily fraction radiation [Radiation Therapy Oncology Group (RTOG) 8502]. None of the patients with < 30 Gy (less than three courses) developed late toxicity. A total of 11/193 (6%) developed Grade 3+ late toxicity (nine Grade 3, on Grade 4, one Grade 5). Actuarial analysis of complication rate by survival time for Grades 3, 4, and 5 shows a cumulative incidence for complications after 6 months that plateaus at 6.9% by 18 months. The cumulative incidence for Grades 4 and 5 is 2.0% by 12 months.more » The difference in late effect for the 2-week rest vs. 4-week rest was not statistically different (p = .47). Patient factors evaluated for increased risk of late complications included prior surgeries, age, sex, KPS and primary. None were found to have significant statistical correlations with late effects. The crude late complications rate is 6%. Actuarial analysis using cumulative incidence shows 6.9% by 18 months. This represents a significant decrease in late complications from 49% seen with higher dose per fraction (10 Gy {times} 3) piloted by Radiation Therapy Oncology Group (7905) for a similar group of patients. Long-term analysis of late complication indicates this schedule can be used in the pelvis with relatively low incidence of complication. This schedule has significant logistic benefits and has been shown to produce good tumor regression and excellent palliation of symptoms. 14 refs., 4 figs., 4 tabs.« less
Balasegaram, S; Potter, A L; Grynszpan, D; Barlow, S; Behrens, R H; Lighton, L; Booth, L; Inamdar, L; Neal, K; Nye, K; Lawrence, J; Jones, J; Gray, I; Tolley, D; Lane, C; Adak, B; Cummins, A; Addiman, S
2012-09-01
The Typhoid and Paratyphoid Reference Group (TPRG) was convened by the Health Protection Agency (HPA) and the Chartered Institute of Environmental Health (CIEH) to revise guidelines for public health management of enteric fever. This paper presents the new guidelines for England and their rationale. Methods include literature reviews including grey literature such as audit data and case studies; analysis of enhanced surveillance data from England, Wales and Northern Ireland; review of clearance and screening schedules in use in other non-endemic areas; and expert consensus. The evidence and principles underpinning the new guidance are summarised. Significant changes from previous guidance include: • Algorithms to guide risk assessment and management, based on risk group and travel history; • Outline of investigation of non-travel cases; • Simplified microbiological clearance schedules for cases and contacts; • Targeted co-traveller screening and a "warn and inform" approach for contacts; • Management of convalescent and chronic carriers. The guidelines were launched in February 2012. Feedback has been positive: the guidelines are reported to be clear, systematic, practical and risk-based. An evaluation of the guidelines is outlined and will add to the evidence base. There is potential for simplification and consistency between international guidelines. Copyright © 2012 The British Infection Association. Published by Elsevier Ltd. All rights reserved.
The association between rotating shift work and increased occupational stress in nurses.
Lin, Pei-Chen; Chen, Chung-Hey; Pan, Shung-Mei; Chen, Yao-Mei; Pan, Chih-Hong; Hung, Hsin-Chia; Wu, Ming-Tsang
2015-01-01
The aim of this study was to investigate whether rotating shift work increases occupational stress in nurses. This study measured shift work scheduling and occupational stress by using the Effort-Reward Imbalance model with self-reported questionnaires in a sample of 654 female nurses. Overcommitment risk was higher in nurses who worked rotating shifts than in those who worked day/non-night shifts (OR, 2.16; 95% CI, 1.03-4.66). However, an effort/reward imbalance was not directly associated with work schedules (OR, 1.88; 95% CI, 0.87-4.35). Among nurses working rotation rotating shifts, those who had 2 days off after their most recent night shifts showed an alleviated risk of overcommitment (OR, 0.52; 95% CI, 0.32-0.82), but those who had worked for at least one series of 7 consecutive work days per month had an increased risk of effort/reward imbalance (OR, 2.75; 95% CI, 1.69-4.48). Additionally, those who had little or no participation in planning working hours and shift scheduling and worked overtime at least three times per week during the preceding 2 months tended to have high stress. The nurses who worked rotating shifts tended to experience work-related stress, but their stress levels improved if they had at least 2 days off after their most recent night shift and if they were not scheduled to work 7 consecutive days. These empirical data can be used to optimize work schedules for nurses to alleviate work stress.
Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns
NASA Technical Reports Server (NTRS)
Majerowicz, Walt; Shinn, Stephen A.
2016-01-01
This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.
DOT National Transportation Integrated Search
2013-01-01
Each railroad covered by 49 CFR 228.407 must perform an analysis of the work schedules of its train employees who are engaged in commuter or intercity rail passenger transportation and identify those schedules that, if worked by such a train employee...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Miralbell, Raymond, E-mail: Raymond.Miralbell@hcuge.ch; Institut Oncologic Teknon, Barcelona; Roberts, Stephen A.
2012-01-01
Purpose: There are reports of a high sensitivity of prostate cancer to radiotherapy dose fractionation, and this has prompted several trials of hypofractionation schedules. It remains unclear whether hypofractionation will provide a significant therapeutic benefit in the treatment of prostate cancer, and whether there are different fractionation sensitivities for different stages of disease. In order to address this, multiple primary datasets have been collected for analysis. Methods and Materials: Seven datasets were assembled from institutions worldwide. A total of 5969 patients were treated using external beams with or without androgen deprivation (AD). Standard fractionation (1.8-2.0 Gy per fraction) was usedmore » for 40% of the patients, and hypofractionation (2.5-6.7 Gy per fraction) for the remainder. The overall treatment time ranged from 1 to 8 weeks. Low-risk patients comprised 23% of the total, intermediate-risk 44%, and high-risk 33%. Direct analysis of the primary data for tumor control at 5 years was undertaken, using the Phoenix criterion of biochemical relapse-free survival, in order to calculate values in the linear-quadratic equation of k (natural log of the effective target cell number), {alpha} (dose-response slope using very low doses per fraction), and the ratio {alpha}/{beta} that characterizes dose-fractionation sensitivity. Results: There was no significant difference between the {alpha}/{beta} value for the three risk groups, and the value of {alpha}/{beta} for the pooled data was 1.4 (95% CI = 0.9-2.2) Gy. Androgen deprivation improved the bNED outcome index by about 5% for all risk groups, but did not affect the {alpha}/{beta} value. Conclusions: The overall {alpha}/{beta} value was consistently low, unaffected by AD deprivation, and lower than the appropriate values for late normal-tissue morbidity. Hence the fractionation sensitivity differential (tumor/normal tissue) favors the use of hypofractionated radiotherapy schedules for all risk groups, which is also very beneficial logistically in limited-resource settings.« less
James, Melissa; Swadi, Sami; Yi, Ma; Johansson, Lisa; Robinson, Bridget; Dixit, Ashutosh
2018-06-01
We report the incidence of ischaemic cardiac toxicity in a contemporary cohort of patients receiving conventional (CFRT) or hypofractionated (HFRT) radiation after surgery for early breast cancer and investigate the interplay of cardiac risk factors and fractionation. Included were patients receiving external beam radiation treatment from 2002 to 2006 at the Christchurch public hospital. Hospital coding databases, oncology databases and medical records were reviewed for baseline characteristics, treatment details and outcomes. The primary outcome was cardiac toxicity (including myocardial infarction, admission for cardiac chest pain, coronary angiogram positivity and ischaemic cardiac death). Kaplan-Meier methods were used to derive ischaemic cardiac event free and overall survival. Predefined univariate and multivariate analysis was performed to investigate interaction with radiation fraction size, cardiac risk factors, age and side of cancer. Standardised mortality ratios were constructed. Five hundred and one patients were identified, 220 treated with CFRT and 281 with HFRT. The median age was 56 and median follow-up 10.33 years. The 10-year breast cancer specific survival was 81.8% (95% CI %.78.1-85.0). The 10-year freedom from cardiac death was 98.6% (95% CI 96.9-99.4). There were 27 post radiation cardiac events including 5 cardiac deaths and 19 cases of acute myocardial infarction. 265 (53%) had at least one cardiac risk factor. Twenty five of the 27 patients with a cardiac event had cardiac risk factors. On univariate and multivariate analysis, fractionation schedule was not significantly associated with a post radiation ischaemic event, however, there was a significant relationship with age and the presence of a cardiac risk factor. The standardised mortality ratio was 0.89 (95% CI: 0-3.13). Our study has shown a low rate of ischaemic cardiac disease for both CFRT and HFRT in women treated for breast cancer with no evidence of an effect with fractionation schedule. Coexisting cardiac risk factors are common in the population. © 2018 The Royal Australian and New Zealand College of Radiologists.
Satellite-instrument system engineering best practices and lessons
NASA Astrophysics Data System (ADS)
Schueler, Carl F.
2009-08-01
This paper focuses on system engineering development issues driving satellite remote sensing instrumentation cost and schedule. A key best practice is early assessment of mission and instrumentation requirements priorities driving performance trades among major instrumentation measurements: Radiometry, spatial field of view and image quality, and spectral performance. Key lessons include attention to technology availability and applicability to prioritized requirements, care in applying heritage, approaching fixed-price and cost-plus contracts with appropriate attention to risk, and assessing design options with attention to customer preference as well as design performance, and development cost and schedule. A key element of success either in contract competition or execution is team experience. Perhaps the most crucial aspect of success, however, is thorough requirements analysis and flowdown to specifications driving design performance with sufficient parameter margin to allow for mistakes or oversights - the province of system engineering from design inception to development, test and delivery.
A comprehensive and efficient process for counseling patients desiring sterilization.
Haws, J M; Butta, P G; Girvin, S
1997-06-01
To optimize the time spent counseling a sterilization patient, this article presents a 10-step process that includes all steps necessary to ensure a comprehensive counseling session: (1) Discuss current contraception use and all available methods; (2) assess the client's interest in/readiness for sterilization; (3) emphasize that the procedure is meant to be permanent, but there is a possibility of failure; (4) explain the surgical procedure using visuals, and include a discussion of benefits and risks; (5) explain privately to the client the need to use condoms if engaging in risky sexual activity; (6) have the client read and sign an informed consent form; (7) schedule an appointment for the procedure and provide the patient with a copy of all necessary paperwork; (8) discuss cost and payment method; (9) provide written preoperative and postoperative instructions; and (10) schedule a postoperation visit, or a postoperation semen analysis.
US long-haul truck driver work organization and the association with cardiometabolic disease risk.
Hege, Adam; Lemke, Michael Kenneth; Apostolopoulos, Yorghos; Perko, Mike; Sönmez, Sevil; Strack, Robert
2017-09-03
Work organization, including long working hours, irregular work schedules, and job stress, has been associated with increased cardiometabolic disease (CMD) risk for numerous working populations. The purpose of this study was to examine the associations between work hours, work schedules, job stress, and CMD risk for a sample of US long-haul truck drivers (LHTDs). A nonexperimental, descriptive, cross-sectional design was employed to collect survey and anthropometric data from 260 US LHTDs at a major truck stop. The mean BMI was 33.40 kg/m 2 and mean waist circumference was 114.77 cm. Using logistic regression, researchers found longer work hours, especially greater than 11 hours daily, were associated with increased odds for an extremely high risk of CMD. Results support comprehensive and integrated approaches that address work organization, and in particular long working hours, to reduce drivers' CMD risk.
Planning and Scheduling of Software Manufacturing Projects
1991-03-01
based on the previous results in social analysis of computing, operations research in manufacturing, artificial intelligence in manufacturing...planning and scheduling, and the traditional approaches to planning in artificial intelligence, and extends the techniques that have been developed by them...social analysis of computing, operations research in manufacturing, artificial intelligence in manufacturing planning and scheduling, and the
NASA Technical Reports Server (NTRS)
Craft, R.; Dunn, C.; Mccord, J.; Simeone, L.
1980-01-01
A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.
Evaluation of scheduling techniques for payload activity planning
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1991-01-01
Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
NASA Technical Reports Server (NTRS)
2002-01-01
Under a Phase II SBIR contract, Kennedy and Lumina Decision Systems, Inc., jointly developed the Schedule and Cost Risk Analysis Modeling (SCRAM) system, based on a version of Lumina's flagship software product, Analytica(R). Acclaimed as "the best single decision-analysis program yet produced" by MacWorld magazine, Analytica is a "visual" tool used in decision-making environments worldwide to build, revise, and present business models, minus the time-consuming difficulty commonly associated with spreadsheets. With Analytica as their platform, Kennedy and Lumina created the SCRAM system in response to NASA's need to identify the importance of major delays in Shuttle ground processing, a critical function in project management and process improvement. As part of the SCRAM development project, Lumina designed a version of Analytica called the Analytica Design Engine (ADE) that can be easily incorporated into larger software systems. ADE was commercialized and utilized in many other developments, including web-based decision support.
Predicting risk for medical malpractice claims using quality-of-care characteristics.
Charles, S C; Gibbons, R D; Frisch, P R; Pyskoty, C E; Hedeker, D; Singha, N K
1992-01-01
The current fault-based tort system assumes that claims made against physicians are inversely related to the quality of care they provide. In this study we identified physician characteristics associated with elements of medical care that make physicians vulnerable to malpractice claims. A sample of physicians (n = 248) thought to be at high or low risk for claims was surveyed on various personal and professional characteristics. Statistical analysis showed that 9 characteristics predicted risk group. High risk was associated with increased age, surgical specialty, emergency department coverage, increased days away from practice, and the feeling that the litigation climate was "unfair." Low risk was associated with scheduling enough time to talk with patients, answering patients' telephone calls directly, feeling "satisfied" with practice arrangements, and acknowledging greater emotional distress. Prediction was more accurate for physicians in practice 15 years or less. We conclude that a relationship exists between a history of malpractice claims and selected physician characteristics. PMID:1462538
Long-Term Effectiveness of Accelerated Hepatitis B Vaccination Schedule in Drug Users
Shah, Dimpy P.; Grimes, Carolyn Z.; Nguyen, Anh T.; Lai, Dejian
2015-01-01
Objectives. We demonstrated the effectiveness of an accelerated hepatitis B vaccination schedule in drug users. Methods. We compared the long-term effectiveness of accelerated (0–1–2 months) and standard (0–1–6 months) hepatitis B vaccination schedules in preventing hepatitis B virus (HBV) infections and anti-hepatitis B (anti-HBs) antibody loss during 2-year follow-up in 707 drug users (HIV and HBV negative at enrollment and completed 3 vaccine doses) from February 2004 to October 2009. Results. Drug users in the accelerated schedule group had significantly lower HBV infection rates, but had a similar rate of anti-HBs antibody loss compared with the standard schedule group over 2 years of follow-up. No chronic HBV infections were observed. Hepatitis C positivity at enrollment and age younger than 40 years were independent risk factors for HBV infection and antibody loss, respectively. Conclusions. An accelerated vaccination schedule was more preferable than a standard vaccination schedule in preventing HBV infections in drug users. To overcome the disadvantages of a standard vaccination schedule, an accelerated vaccination schedule should be considered in drug users with low adherence. Our study should be repeated in different cohorts to validate our findings and establish the role of an accelerated schedule in hepatitis B vaccination guidelines for drug users. PMID:25880946
Brogmus, G E
2007-03-01
While there is a growing body of research on the impact of work schedules on the risk of occupational injuries, there has been little investigation into the impact that the day of the week might have. The present research was completed to explore day of the week trends, reasons for such trends and the corresponding implications for work scheduling. Data for the number of injuries and illnesses involving days away from work (lost time; LT) in 2004 were provided by the US Bureau of Labor Statistics Office of Safety and Health Statistics. Data from the American Time Use Survey database were used to estimate work hours in 2004. From these two data sources, the rate of LT injuries and illnesses (per 200 000 work hours) by day of the week, industry sector and gender were estimated. The analysis revealed clear differences by day of the week, gender and major industry sector. Sundays had the highest rate overall--nearly 37% higher than the average of the remaining days, Monday to Saturday. Mondays had the next highest rate followed closely by Saturdays. This pattern was not the same for males and females. For males, Mondays had the highest LT rate (27% higher than the average of all other days) with all remaining days having essentially the same rate. For females, Sundays and Saturdays had much higher LT rates--122% and 60% higher, respectively, than the average weekday rate. There were also differences by industry and differences between genders by industry. The present analysis suggests that several factors may be contributing to the weekend and Monday trends observed. Lower-tenured (and younger) workers on the weekends, lower female management/supervision and second jobs on the weekend seem to be contributors to the high Saturday and Sunday LT rates. Differences in day of the week employment by industry did not account for the trends observed. Fraud and overtime also could not be confirmed as contributing to these trends. Monday trends were more complex to explain, with possible explanations including non-work-related weekend injuries being reported on Mondays, soft-tissue symptoms becoming more noticeable on Mondays, greater Monday morning flexion risk and reduced supervision in the construction industry on Mondays. Interpretation of these trends and the implications for work scheduling are discussed.
The incidence of urolithiasis among commercial aviation pilots.
Hyams, Elias S; Nelms, David; Silberman, Warren S; Feng, Zhaoyong; Matlaga, Brian R
2011-09-01
A kidney stone event in a commercial aviation pilot has significant vocational implications since the Federal Aviation Administration specifically prohibits medical certification in the setting of recent or recurrent stone disease. Given these serious concerns, an understanding of the burden of stone disease on the commercial aviation community is important. Thus, we performed a study in partnership with the Federal Aviation Administration to better characterize the epidemiology of this condition. We reviewed the Federal Aviation Administration Aerospace Medical Certification database for 2000 through 2007. Pilots with a class I certificate (scheduled commercial aviation) were selected for further review. All medical certificates submitted with a pathology code of 573 (urolithiasis) were identified for analysis. From 2000 through 2007 between 3.7% and 4.6% of scheduled commercial aviation pilots were diagnosed with urolithiasis. However, during the study period there was a significant decrease in the proportion of pilots diagnosed with urolithiasis. A meaningful number of commercial aviation pilots are affected by urolithiasis each year. Our analysis detected a significant decrease in the proportion of affected pilots, although the reason for this trend is not well understood. It may be that changes in the occupational environment that could affect risk factors for stone formation are responsible. Further efforts to characterize stone risk in this unique population are welcome, given the larger vocational and societal consequences of a stone event in the setting of airline transport. Copyright © 2011 American Urological Association Education and Research, Inc. Published by Elsevier Inc. All rights reserved.
Clinical risk analysis with failure mode and effect analysis (FMEA) model in a dialysis unit.
Bonfant, Giovanna; Belfanti, Pietro; Paternoster, Giuseppe; Gabrielli, Danila; Gaiter, Alberto M; Manes, Massimo; Molino, Andrea; Pellu, Valentina; Ponzetti, Clemente; Farina, Massimo; Nebiolo, Pier E
2010-01-01
The aim of clinical risk management is to improve the quality of care provided by health care organizations and to assure patients' safety. Failure mode and effect analysis (FMEA) is a tool employed for clinical risk reduction. We applied FMEA to chronic hemodialysis outpatients. FMEA steps: (i) process study: we recorded phases and activities. (ii) Hazard analysis: we listed activity-related failure modes and their effects; described control measures; assigned severity, occurrence and detection scores for each failure mode and calculated the risk priority numbers (RPNs) by multiplying the 3 scores. Total RPN is calculated by adding single failure mode RPN. (iii) Planning: we performed a RPNs prioritization on a priority matrix taking into account the 3 scores, and we analyzed failure modes causes, made recommendations and planned new control measures. (iv) Monitoring: after failure mode elimination or reduction, we compared the resulting RPN with the previous one. Our failure modes with the highest RPN came from communication and organization problems. Two tools have been created to ameliorate information flow: "dialysis agenda" software and nursing datasheets. We scheduled nephrological examinations, and we changed both medical and nursing organization. Total RPN value decreased from 892 to 815 (8.6%) after reorganization. Employing FMEA, we worked on a few critical activities, and we reduced patients' clinical risk. A priority matrix also takes into account the weight of the control measures: we believe this evaluation is quick, because of simple priority selection, and that it decreases action times.
77 FR 21775 - Risk Adjustment Meeting-May 7, 2012 and May 8, 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-11
... notice announces a meeting on the risk adjustment program, which is open to the public. The purpose of... plan average actuarial risk, calculation of payments and charges, data collection approach, and the..., calculation of payments and charges, data collection approach, and the schedule for running risk adjustment...
Socio-economic and demographic determinants of childhood anemia.
Goswmai, Sankar; Das, Kishore K
2015-01-01
To evaluate socio-economic and demographic determinants of anemia among Indian children aged 6-59 months. Statistical analysis was performed on the cross-sectional weighted sample of 40,885 children from 2005 to 2006 National Family Health Survey by using multinomial logistic regression to assess the significance of some risk factors in different degrees of child anemia. Anemia was diagnosed by World Health Organization (WHO) cut-off points on hemoglobin level. Pearson's chi-squared test was applied to justify the associations of anemia with different categories of the study population. The prevalence of anemia was 69.5%; 26.2% mild, 40.4% moderate, and 2.9% severe anemia. Overall prevalence rate, along with mild and moderate cases, showed an increasing trend up to 2 years of age and then decreased. Rural children had a higher prevalence rate. Of 28 Indian states in the study, 10 states showed very high prevalence, the highest being Bihar (77.9%). Higher birth order, high index of poverty, low level of maternal education, mother's anemia, non-intake of iron supplements during pregnancy, and vegetarian mother increased the risks of all types of anemia among children (p<0.05). Christian population was at lower risk; and Scheduled Caste, Scheduled Tribe, and Other Backward Class categories were at higher risk of anemia. The results suggest a need for proper planning and implementation of preventive measures to combat child anemia. Economically under-privileged groups, maternal nutrition and education, and birth control measures should be priorities in the programs. Copyright © 2015 Sociedade Brasileira de Pediatria. Published by Elsevier Editora Ltda. All rights reserved.
Schomann, Carsten; Giebel, Ole; Nachreiner, Friedhelm
2006-01-01
BASS 4, a computer program for the design and evaluation of workings hours, is an example of an ergonomics-based software tool that can be used by safety practitioners at the shop floor with regard to legal, ergonomic, and economic criteria. Based on experiences with this computer program, a less sophisticated Working-Hours-Risk Index for assessing the quality of work schedules (including flexible work hours) to indicate risks to health and wellbeing has been developed to provide a quick and easy applicable tool for legally required risk assessments. The results of a validation study show that this risk index seems to be a promising indicator for predicting risks of health complaints and wellbeing. The purpose of the Risk Index is to simplify the evaluation process at the shop floor and provide some more general information about the quality of a work schedule that can be used for triggering preventive interventions. Such a risk index complies with practitioners' expectations and requests for easy, useful, and valid instruments.
Simultaneously optimizing dose and schedule of a new cytotoxic agent.
Braun, Thomas M; Thall, Peter F; Nguyen, Hoang; de Lima, Marcos
2007-01-01
Traditionally, phase I clinical trial designs are based upon one predefined course of treatment while varying among patients the dose given at each administration. In actual medical practice, patients receive a schedule comprised of several courses of treatment, and some patients may receive one or more dose reductions or delays during treatment. Consequently, the overall risk of toxicity for each patient is a function of both actual schedule of treatment and the differing doses used at each adminstration. Our goal is to provide a practical phase I clinical trial design that more accurately reflects actual medical practice by accounting for both dose per administration and schedule. We propose an outcome-adaptive Bayesian design that simultaneously optimizes both dose and schedule in terms of the overall risk of toxicity, based on time-to-toxicity outcomes. We use computer simulation as a tool to calibrate design parameters. We describe a phase I trial in allogeneic bone marrow transplantation that was designed and is currently being conducted using our new method. Our computer simulations demonstrate that our method outperforms any method that searches for an optimal dose but does not allow schedule to vary, both in terms of the probability of identifying optimal (dose, schedule) combinations, and the numbers of patients assigned to those combinations in the trial. Our design requires greater sample sizes than those seen in traditional phase I studies due to the larger number of treatment combinations examined. Our design also assumes that the effects of multiple administrations are independent of each other and that the hazard of toxicity is the same for all administrations. Our design is the first for phase I clinical trials that is sufficiently flexible and practical to truly reflect clinical practice by varying both dose and the timing and number of administrations given to each patient.
Fitzgerald, Janna; Lum, Martin; Dadich, Ann
2006-05-01
Theatre use is heavily influenced by the presentation and scheduling of emergency cases for unplanned surgery. This research guided the development of a triage standard for scheduling emergency surgery in New South Wales public hospitals and aimed to contribute to a better understanding of decision-making practices. An emergency-surgery survey asked questions about urgency of a set of clinical conditions and appropriate time frames for patients to receive surgical treatment for these conditions. Surveys were distributed via 71 NSW public hospitals. A total of 198 decision makers responded: surgeons (42.8%), anaesthetists (24.7%), and nurses (32.5%). Principal component analysis was applied to reduce the data to three urgency classifications, and analysis of variance was used to assess variance of opinions between professional groups. The data suggested that the parameters that distinguish the codes (1, very urgent; 2, semi-urgent; 3, least urgent) were not unequivocally apparent. Although there was a consistent approach to the "urgency 1" and "urgency 3" categories, there were significant differences between responses when determining "urgency 2". The data indicated that when making decisions, anaesthetists act as intermediaries between surgeons and nurses. There was significant disparity between individuals when respondents were asked to state an ideal time for the commencement of surgery and the maximum length of time that the surgery could wait. This presented a need for a risk assessment tool to be incorporated when developing a dynamic prototype triage instrument.
Space station payload operations scheduling with ESP2
NASA Technical Reports Server (NTRS)
Stacy, Kenneth L.; Jaap, John P.
1988-01-01
The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.
ERIC Educational Resources Information Center
SPAULDING, ROBERT L.
THIS BOOKLET INTRODUCES TWO MEASUREMENT INSTRUMENTS FOCUSING ON CLASS MANAGEMENT. THE COPING ANALYSIS SCHEDULE FOR EDUCATIONAL SETTINGS PERMITS THE CODIFICATION OF ALL OPERANT BEHAVIOR OBSERVED IN THE CLASSROOM, INTO ONE OF THIRTEEN CATEGORIES. ALL BUT ONE OF THE THIRTEEN CATEGORIES ARE DESIGNED TO CHARACTERIZE THE CHILD'S ECONOMY WITH THE…
Fatigue Management Strategies for the Stratospheric Observatory for Infrared Astronomy
NASA Technical Reports Server (NTRS)
Bendrick, Gregg
2012-01-01
Operation of the Stratospheric Observatory for Infrared Astronomy entails a great deal of night-time work, with the potential for both acute and chronic sleep loss, as well as circadian rhythm dysynchrony. Such fatigue can result in performance decrements, with an increased risk of operator error. The NASA Dryden Flight Research Center manages this fatigue risk by means of a layered approach, to include: 1) Education and Training 2) Work Schedule Scoring 3) Obtained Sleep Metrics 4) Workplace and Operational Mitigations and 5) Incident or Accident Investigation. Specifically, quantitative estimation of the work schedule score, as well as the obtained sleep metric, allows Supervisors and Managers to better manage the risk of fatigue within the context of mission requirements.
Sikorski, J.; Wilson, J.; Clement, S.; Das, S.; Smeeton, N.
1996-01-01
OBJECTIVE--To compare the clinical and psychological effectiveness of the traditional British antenatal visit schedule (traditional care) with a reduced schedule of visits (new style care) for low risk women, together with maternal and professional satisfaction with care. DESIGN--Randomised controlled trial. SETTING--Places in south east London providing antenatal care for women receiving shared care and planning to deliver in one of three hospitals or at home. SUBJECT--2794 women at low risk fulfilling the trial's inclusion criteria between June 1993 and July 1994. MAIN OUTCOME MEASURES--Measures of fetal and maternal morbidity, health service use, psychosocial outcomes, and maternal and professional satisfaction. RESULTS--Pregnant women allocated to new style care had fewer day admissions (0.8 v 1.0; P=0.002) and ultrasound scans (1.6 v 1.7; P=0.003) and were less often suspected of carrying fetuses that were small for gestational age (odds ratio 0.73; 95% confidence interval 0.54 to 0.99). They also had some poorer psychosocial outcomes; for example, they were more worried about fetal wellbeing antenatally and coping with the baby postnatally, and they had more negative attitudes to their babies, both in pregnancy and postnatally. These women were also more dissatisfied with the number of visits they received (odds ratio 2.50; 2.00 to 3.11). CONCLUSIONS--Patterns of antenatal care involving fewer routine visits for women at low risk may lead to reduced psychosocial effectiveness and dissatisfaction with frequency of visits. The number of antenatal day admissions and ultrasound scans performed may also be reduced. For the variables reported, the visit schedules studied are similar in their clinical effectiveness. Uncertainty remains as to the clinical effectiveness of reduced visit schedules for rare pregnancy problems. PMID:8595286
Expert systems tools for Hubble Space Telescope observation scheduling
NASA Technical Reports Server (NTRS)
Miller, Glenn; Rosenthal, Don; Cohen, William; Johnston, Mark
1987-01-01
The utility of expert systems techniques for the Hubble Space Telescope (HST) planning and scheduling is discussed and a plan for development of expert system tools which will augment the existing ground system is described. Additional capabilities provided by these tools will include graphics-oriented plan evaluation, long-range analysis of the observation pool, analysis of optimal scheduling time intervals, constructing sequences of spacecraft activities which minimize operational overhead, and optimization of linkages between observations. Initial prototyping of a scheduler used the Automated Reasoning Tool running on a LISP workstation.
[Thrombosis and obstruction associated with central venous lines. Incidence and risk factors].
Vivanco Allende, A; Rey Galán, C; Rodríguez de la Rúa, M V; Alvarez García, F; Medina Villanueva, A; Concha Torre, A; Mayordomo Colunga, J; Martínez Camblor, P
2013-09-01
To analyse the incidence of thrombosis and obstruction associated with central venous lines (CVL) inserted in critically ill children, and to determine their risk factors. Prospective observational study in a Pediatric Intensive Care Unit in a University Hospital. An analysis was made of 825 CVL placed in 546 patients. Age, gender, weight, type of catheter (lines, size, and brand), final location of the catheter, mechanical ventilation, type of sedation and analgesia used, initial failure by the doctor to perform CVL catheterization, number of attempts, CVL indication, admission diagnosis, emergency or scheduled procedure, and delayed mechanical complications (DMC). Risk factors for these complications were determined by a multiple regression analysis. A total of 52 cases of DMC, 42 cases of obstruction, and 10 of thrombosis were registered. Obstruction and thrombosis rates were 4.96 and 1.18 per 100 CVL, respectively. The only risk factor independently linked to obstruction was the duration of the CVL (OR 1.05; 95% CI; 1.00-1.10). The number of lines with thrombosis (OR 4.88; 95% CI; 1.26-18.0), as well as parenteral nutrition (OR 4.17; 95% CI; 1.06-16.31) was statistically significant according to bivariate analysis. However, no risk factors for thrombosis were found in the multivariate analysis. Obstruction and thrombosis of CVL inserted in a Pediatric Intensive Care Unit are relatively common complications. CVL duration is an independent risk factor for any line obstruction. Copyright © 2012 Asociación Española de Pediatría. Published by Elsevier Espana. All rights reserved.
Cukierman-Yaffe, Tali; Kasher-Meron, Michal; Fruchter, Eyal; Gerstein, Hertzel C; Afek, Arnon; Derazne, Estela; Tzur, Dorit; Karasik, Avraham; Twig, Gilad
2015-12-01
Although dysglycemia is a risk factor for cognitive decline, it is unknown whether cognitive performance among young and apparently healthy adults affect the risk for impaired fasting glucose (IFG). This study aimed to characterize the relationship between cognitive function and the risk for IFG among young adults. This was a retrospective cohort study utilizing data collected at pre-military recruitment assessments with information collected at the screening center of Israeli Army Medical Corps. Normoglycemic adults (n = 17 348) (free of IFG and diabetes; mean age 31.0 ± 5.6 y; 87% men) of the Metabolic Lifestyle and Nutrition Assessment in Young Adults (MELANY) cohort with data regarding their General Intelligence Score (GIS), a comprehensive measure of cognitive function, at age 17 y. Fasting plasma glucose was assessed every 3-5 y at scheduled visits. Cox proportional hazards models were applied. The main outcome of the study was incident IFG (≥ 100 mg/dL and <126 mg/dL) at scheduled visits. During a median followup of 6.6 y, 1478 cases of IFG were recorded (1402 men). After adjustment for age and sex, participants in the lowest GIS category had a 1.9-fold greater risk for incident IFG compared with those in the highest GIS category. In multivariable analysis adjusted for age, sex, body mass index, fasting plasma glucose, family history of diabetes, country of origin, socioeconomic status, education, physical activity, smoking status, alcohol consumption, breakfast consumption, triglyceride level, white blood cell count, the risk for IFG was nearly doubled in the lowest GIS category compared with the highest GIS category (hazard ratio, 1.8; 95% confidence interval, 1.4-2.3; P < .001). These results persisted when GIS was treated as a continuous variable and when the model was adjusted also for body mass index at the end of followup. This study demonstrates that lower cognitive function at late adolescence is independently associated with an elevated risk IFG in both men and women.
2016-02-01
components. In 2010, they began an LEP to consolidate four versions of a legacy nuclear weapon, the B61 bomb , into a bomb called the B61-12 (see...Force Integrated Master Schedule BIMS Boeing Integrated Master Schedule B61 bomb B61 legacy bomb CD critical decision Cost Guide GAO Cost...are versions of the B61 bomb , an aircraft-delivered weapon that is a key component of the United States’ commitments to the North Atlantic Treaty
Firefighter Shift Schedules Affect Sleep Quality.
Billings, Joel; Focht, Will
2016-03-01
The aim of this study was to investigate the prevalence and severity of firefighter sleep quality across department shift schedules. Sleep quality was assessed using a Pittsburgh Sleep Quality Index in a sample of 109 male career firefighters from six fire departments in three Southwestern US states. The three shift schedules studied were 24on/48off, 48on/96off, and Kelly. Seventy-three percent of firefighters report poor sleep quality. The 24on/48off shift schedule is associated with the best sleep quality and Kelly is associated with the worst sleep quality. Firefighters working second jobs report significantly poorer sleep quality than those who do not. Shift schedules that disrupt normal circadian rhythms more result in poorer sleep quality, which can lead to less effective emergency response and increased risk to firefighter health and safety.
NASA Technical Reports Server (NTRS)
Zimmerman, W. F.; Matijevic, J. R.
1987-01-01
Novel system engineering techniques have been developed and applied to establishing structured design and performance objectives for the Telerobotics Testbed that reduce technical risk while still allowing the testbed to demonstrate an advancement in state-of-the-art robotic technologies. To estblish the appropriate tradeoff structure and balance of technology performance against technical risk, an analytical data base was developed which drew on: (1) automation/robot-technology availability projections, (2) typical or potential application mission task sets, (3) performance simulations, (4) project schedule constraints, and (5) project funding constraints. Design tradeoffs and configuration/performance iterations were conducted by comparing feasible technology/task set configurations against schedule/budget constraints as well as original program target technology objectives. The final system configuration, task set, and technology set reflected a balanced advancement in state-of-the-art robotic technologies, while meeting programmatic objectives and schedule/cost constraints.
Valea, Innocent; Tinto, Halidou; Drabo, Maxime K; Huybregts, Lieven; Henry, Marie-Claire; Roberfroid, Dominique; Guiguemde, Robert T; Kolsteren, Patrick; D'Alessandro, Umberto
2010-11-12
Intermittent preventive treatment with sulphadoxine-pyrimethamine (IPTp-SP) is being implemented in most malaria endemic countries as a standard two-doses regimen as it reduces the risk of low birth weight (LBW) and the prevalence of maternal anaemia. Nevertheless, where the risk of infection close to delivery is high because of intense transmission, a third IPTp-SP dose may further reduce the negative effects of malaria on pregnancy outcome. Pregnant women in the 2nd or 3rd trimester were randomized to receive either 2 (SP2) or 3 doses (SP3) of SP. Trained field workers paid home visits to the women for drug administration according to a predefined drug delivery schedule. Women were encouraged to attend their scheduled ANC visits and to deliver at the health facilities where the new-born was weighed. The prevalence of LBW (<2500 g), severe anaemia (Hb < 8 g/dL) and premature birth was analysed using intention-to-treat (ITT) and per-protocol (PP) analysis. Data from 1274 singleton pregnancies were analysed (641 in the SP3 and 633 in the SP2 group). The uptake of the intervention appeared to be low. Though the prevalence of LBW in both intervention groups was similar (adjusted Incident Rate Ratio, AIRR = 0.92, 95%CI: 0.69-1.24) in the ITT analysis, the risk of severe anaemia was significantly lower in the SP3 group compared to the SP2 group (AIRR = 0.38, 95%CI: 0.16 - 0.90). The PP analysis showed a trend of reduced risk of LBW, severe anaemia and premature delivery in the SP3 group, albeit the difference between two and three IPTp-SP did not reach statistical significance. The risk of LBW and severe anaemia tended to be lower in the SP3 group, though this was not statistically significant, probably due to the low uptake of the intervention which reduced the power of the study. Further studies are needed for establishing whether a third SP dose has a real benefit in preventing the negative effects of malaria in pregnancy in settings where transmission is markedly seasonal.
Managing Large Scale Project Analysis Teams through a Web Accessible Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.
2008-01-01
Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.
Leach, Amanda Jane; Wigger, Christine; Andrews, Ross; Chatfield, Mark; Smith-Vaughan, Heidi; Morris, Peter Stanley
2014-08-11
In 2001 when 7-valent pneumococcal conjugate vaccine (PCV7) was introduced, almost all (90%) young Australian Indigenous children living in remote communities had some form of otitis media (OM), including 24% with tympanic membrane perforation (TMP). In late 2009, the Northern Territory childhood vaccination schedule replaced PCV7 with 10-valent pneumococcal Haemophilus influenzae protein D conjugate vaccine (PHiD-CV10). We conducted regular surveillance of all forms of OM in children in remote Indigenous communities between September 2008 and December 2012. This analysis compares children less than 36 months of age who received a primary course of at least two doses of PCV7 or PHiD-CV10, and not more than one dose of another pneumococcal vaccine. Mean ages of 444 PCV7- and 451 PHiD-CV10-vaccinated children were 20 and 18 months, respectively. Bilaterally normal middle ears were detected in 7% and 9% respectively. OM with effusion was diagnosed in 41% and 51% (Risk Difference 10% [95% Confidence Interval 3 to 17] p = 0.002), any suppurative OM (acute OM or any TMP) in 51% versus 39% (RD -12% [95% CI -19 to -5] p = 0.0004], and TMP in 17% versus 14% (RD -3% [95% CI -8 to 2] p = 0.2), respectively. Multivariate analyses described a similar independent negative association between suppurative OM and PHiD-CV10 compared to PCV7 (Odds Ratio = 0.6 [95% CI 0.4 to 0.8] p = 0.001). Additional children in the household were a risk factor for OM (OR = 2.4 [95% CI 2 to 4] p = 0.001 for the third additional child), and older age and male gender were associated with less disease. Other measured risk factors were non-significant. Similar clinical results were found for children who had received non-mixed PCV schedules. Otitis media remains a significant health and social issue for Australian Indigenous children despite PCV vaccination. Around 90% of young children have some form of OM. Children vaccinated in with PHiD-CV10 had less suppurative OM than children vaccinated with PCV7. Ongoing surveillance during the PCV13 era, and trials of early intervention including earlier and mixed vaccine schedules are warranted.
Bridging the Divide between Safety and Risk Management for your Project or Program
NASA Technical Reports Server (NTRS)
Lutomski, Mike
2005-01-01
This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.
Enhanced project management tool
NASA Technical Reports Server (NTRS)
Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)
2012-01-01
A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.
A methodology for the evaluation of program cost and schedule risk for the SEASAT program
NASA Technical Reports Server (NTRS)
Abram, P.; Myers, D.
1976-01-01
An interactive computerized project management software package (RISKNET) is designed to analyze the effect of the risk involved in each specific activity on the results of the total SEASAT-A program. Both the time and the cost of each distinct activity can be modeled with an uncertainty interval so as to provide the project manager with not only the expected time and cost for the completion of the total program, but also with the expected range of costs corresponding to any desired level of significance. The nature of the SEASAT-A program is described. The capabilities of RISKNET and the implementation plan of a RISKNET analysis for the development of SEASAT-A are presented.
Stimpfel, Amy Witkoski; Brewer, Carol S; Kovner, Christine T
2015-11-01
Registered nurses across the globe bear a heavy injury burden. Every shift, nurses are exposed to a variety of hazards that can jeopardize their health, which negatively impacts their ability to provide high-quality patient care. Previous research suggests that inexperienced, or newly licensed nurses, may have an increased risk for certain occupational injuries. However, the current knowledge base is insufficient to fully understand how work hours influence newly licensed nurses' occupational injury, given the significant variation in hospital organization and work characteristics. To describe newly licensed nurses' shift work characteristics and determine the association between shift type and scheduling characteristics and nurse injury, before and after adjusting for individual and combined effects of demographics, external context, organizational context, and work context, following the Organization of Work model. This study is a secondary analysis of a nationally representative survey of newly licensed registered nurses using a cross-sectional design. The analytic sample includes 1744 newly licensed registered nurses from 34 states and the District of Columbia who reported working in a hospital and were within 6-18 months of passing their state licensure exam at the time of survey administration. Descriptive statistics were calculated, followed by bivariate and multivariate Poisson regression models to assess the relationship between shift type and scheduling characteristics and nurse injury. Lastly, full models with the addition of demographics, external context, organizational context, and work context variables were calculated. The majority (79%) of newly licensed nurses worked 12-h shifts, a near majority worked night shift (44%), and over half (61%) worked overtime (mandatory or voluntary) weekly. Nurses working weekly overtime were associated with a 32% [incidence rate ratio (IRR) 1.32, CI 1.07-1.62] increase in the risk of a needle stick and nurses working night shift were associated with a 16% [IRR 1.16, CI 1.02-1.33] increase in the risk of a sprain or strain injury. Overtime and night shift work were significantly associated with increased injury risk in newly licensed nurses independent of other work factors and demographic characteristics. The findings warrant further study given the long-term consequences of these injuries, costs associated with treatment, and loss of worker productivity. Copyright © 2015 Elsevier Ltd. All rights reserved.
Schiffer, Jarad M; Chen, Ligong; Dalton, Shannon; Niemuth, Nancy A; Sabourin, Carol L; Quinn, Conrad P
2015-07-17
Anthrax Vaccine Adsorbed (AVA, BioThrax) is approved for use in humans as a priming series of 3 intramuscular (i.m.) injections (0, 1, 6 months; 3-IM) with boosters at 12 and 18 months, and annually thereafter for those at continued risk of infection. A reduction in AVA booster frequency would lessen the burden of vaccination, reduce the cumulative frequency of vaccine associated adverse events and potentially expand vaccine coverage by requiring fewer doses per schedule. Because human inhalation anthrax studies are neither feasible nor ethical, AVA efficacy estimates are determined using cross-species bridging of immune correlates of protection (COP) identified in animal models. We have previously reported that the AVA 3-IM priming series provided high levels of protection in non-human primates (NHP) against inhalation anthrax for up to 4 years after the first vaccination. Penalized logistic regressions of those NHP immunological data identified that anti-protective antigen (anti-PA) IgG concentration measured just prior to infectious challenge was the most accurate single COP. In the present analysis, cross-species logistic regression models of this COP were used to predict probability of survival during a 43 month study in humans receiving the current 3-dose priming and 4 boosters (12, 18, 30 and 42 months; 7-IM) and reduced schedules with boosters at months 18 and 42 only (5-IM), or at month 42 only (4-IM). All models predicted high survival probabilities for the reduced schedules from 7 to 43 months. The predicted survival probabilities for the reduced schedules were 86.8% (4-IM) and 95.8% (5-IM) at month 42 when antibody levels were lowest. The data indicated that 4-IM and 5-IM are both viable alternatives to the current AVA pre-exposure prophylaxis schedule. Published by Elsevier Ltd.
Tran, Stephanie; Lavitas, Pavel; Stevens, Karen; Greenwood, Bonnie C; Clements, Karen; Alper, Caroline J; Lenz, Kimberly; Price, Mylissa; Hydery, Tasmina; Arnold, Jennifer L; Takeshita, Mito; Bacon, Rachel; Peristere, Justin P; Jeffrey, Paul L
2017-05-01
In 2012, hydrocodone combination products (HCPs) were the most prescribed medications in the United States. Under the Controlled Substance Act of 1970, hydrocodone alone was classified as a Schedule II drug, while HCPs were classified as Schedule III, indicating a lower risk for abuse and misuse. However, according to a Drug Enforcement Agency analysis, the addition of nonopioids has not been shown to diminish abuse potential of hydrocodone. In response to concerns for drug abuse and overdose, the Drug Enforcement Agency rescheduled HCPs to Schedule II in October 2014, with the intent of limiting overprescribing and increasing awareness of their abuse potential. However, it is unknown whether this has affected the overall claims for HCPs in a Medicaid population. To (a) compare the trend in HCP prescription claims with select non-HCP (opioid and nonopioid) analgesic claims before and after the HCP schedule change in the Massachusetts Medicaid fee-for-service/Primary Care Clinician plan population and (b) identify if there was a change in HCP new start member and claim characteristics before and after the HCP schedule change. This quasi-experimental, retrospective study used enrollment and pharmacy claims data to evaluate all members in the study population 1 year before and after the HCP schedule change. The number of claims for HCPs and select non-HCP analgesics was reported as the monthly rate per total population, and an interrupted time series analysis compared the change in the monthly rate of claims across groups. Members with 1 or more pharmacy claims for a new HCP prescription during a 5-month period before or after the HCP schedule change were analyzed to determine member demographics (age, gender, and number of claims) and claim characteristics (average daily dose, average quantity per claim, and days supply). The rate of HCP claims increased before and decreased after the HCP schedule change. Controlling for the trend during the period before the HCP schedule change, the rate of HCP claims per 1,000 members per month decreased at a greater rate than non-HCP analgesics in the period after the HCP schedule change (P < 0.001). The percentage of HCP claims for new start members decreased after the HCP schedule change (44.9% vs. 34.1% of all HCP claims pre- to post-schedule change; P < 0.001). In the group of new starts, there was not a significant difference in the average daily dose (26.3 mg vs. 26.4 mg; P = 0.69), while there was a decrease in average number of tablets dispensed per claim (from 37.1 to 20.3 tablets; P < 0.001) and an increase in the percentage of claims for a shorter days supply (from 57.7% to 81.6%; P < 0.001). The findings of this study suggest that the HCP schedule change may have contributed to the decrease in claims for HCPs in a Medicaid population. After the HCP schedule change, there was a trend towards decreased HCP use among new starts. No outside funding supported this study. The authors have nothing to disclose. Study concept and design were contributed by all authors except for Arnold and Clements. Tran, Arnold, and Clements took the lead in data collection, along with Peristere, and data interpretation was performed by all the authors, except Arnold. The manuscript was written primarily by Tran, along with Lavitas, Stevens, and Greenwood, and revised by all the authors except Arnold and Peristere. A poster of this research project was presented at the Academy of Managed Care Pharmacy's 2016 Annual Meeting in San Francisco, California, April 2016.
Increasing operating room efficiency through electronic medical record analysis.
Attaallah, A F; Elzamzamy, O M; Phelps, A L; Ranganthan, P; Vallejo, M C
2016-05-01
We used electronic medical record (EMR) analysis to determine errors in operating room (OR) time utilisation. Over a two year period EMR data of 44,503 surgical procedures was analysed for OR duration, on-time, first case, and add-on time performance, within 19 surgical specialties. Maximal OR time utilisation at our institution could have saved over 302,620 min or 5,044 hours of OR efficiency over a two year period. Most specialties (78.95%) had inaccurately scheduled procedure times and therefore used the OR more than their scheduled allotment time. Significant differences occurred between the mean scheduled surgical durations (101.38 ± 87.11 min) and actual durations (108.18 ± 102.27 min; P < 0.001). Significant differences also occurred between the mean scheduled add-on durations (111.4 ± 75.5 min) and the actual add-on scheduled durations (118.6 ± 90.1 minutes; P < 0.001). EMR quality improvement analysis can be used to determine scheduling error and bias, in order to improve efficiency and increase OR time utilisation.
49 CFR 236.1011 - PTC Implementation Plan content requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the following risk factors by track segment: (i) Segment traffic characteristics such as typical...; (4) How, to the extent practical, the PTC system will be implemented to address areas of greater risk to the public and railroad employees before areas of lesser risk; (5) The sequence and schedule in...
Patient Populations, Clinical Associations, and System Efficiency in Healthcare Delivery System
NASA Astrophysics Data System (ADS)
Liu, Yazhuo
The efforts to improve health care delivery usually involve studies and analysis of patient populations and healthcare systems. In this dissertation, I present the research conducted in the following areas: identifying patient groups, improving treatments for specific conditions by using statistical as well as data mining techniques, and developing new operation research models to increase system efficiency from the health institutes' perspective. The results provide better understanding of high risk patient groups, more accuracy in detecting disease' correlations and practical scheduling tools that consider uncertain operation durations and real-life constraints.
Panunzio, M F; Caporizzi, R; Lagravinese, D; Conversano, M
2015-01-01
Every year the Italian Ministry of Health, on the basis of regional data, draws up the "Report on Official Controls" to be submitted to the Parliament. The report contains abundant data, diagrams and charts and illustrates the number and type of official controls (OC) performed by the pertinent Bodies (Ministry of Health, Regional and Local Health Authorities) over the previous year on Food Business Operators (FBO), in accordance with the EC Regulation 882/2004. The trend - which has consolidated over the years - relates to the multiplicity of OC and shows a decrease of such controls compared to an increase in "non-conformities". OC frequency is established by the Regional Authorities on the basis of the categorisation of both a "generic risk" for companies calculated taking into account the probability of occurrence of a "non-conformity", and a "specific" risk, assessed on the basis of the results of the OC actually performed on a given "Operatore del Settore Alimentare" (Food Sector Operator, in Italian: OSA). Thus, categorisation (i.e. the probability of occurrence of non-conformities) is the main driver of the OC scheduling and planning process. We have been asking ourselves whether the current OC planning/scheduling method is still suitable for ensuring food safety in the face of internalisation of the food supply chain. As a matter of fact, food safety is now becoming increasingly variable due to the globalization of consumption where "farm to fork", rather than "border to fork", food safety must be ensured. On the basis of these considerations, a different OC planning /scheduling method is being proposed based on the assessment of risks and the estimation of the occurrence of the same along the agro-food chain.
Risk as a Resource - A New Paradigm
NASA Technical Reports Server (NTRS)
Gindorf, Thomas E.
1996-01-01
NASA must change dramatically because of the current United States federal budget climate. The American people and their elected officials have mandated a smaller, more efficient and effective government. For the past decade, NASA's budget had grown at or slightly above the rate of inflation. In that era, taking all steps to avoid the risk of failure was the rule. Spacecraft development was characterized by extensive analyses, numerous reviews, and multiple conservative tests. This methodology was consistent with the long available schedules for developing hardware and software for very large, billion dollar spacecraft. Those days are over. The time when every identifiable step was taken to avoid risk is being replaced by a new paradigm which manages risk in much the same way as other resources (schedule, performance, or dollars) are managed. While success is paramount to survival, it can no longer be bought with a large growing NASA budget.
Collaborative Resource Allocation
NASA Technical Reports Server (NTRS)
Wang, Yeou-Fang; Wax, Allan; Lam, Raymond; Baldwin, John; Borden, Chester
2007-01-01
Collaborative Resource Allocation Networking Environment (CRANE) Version 0.5 is a prototype created to prove the newest concept of using a distributed environment to schedule Deep Space Network (DSN) antenna times in a collaborative fashion. This program is for all space-flight and terrestrial science project users and DSN schedulers to perform scheduling activities and conflict resolution, both synchronously and asynchronously. Project schedulers can, for the first time, participate directly in scheduling their tracking times into the official DSN schedule, and negotiate directly with other projects in an integrated scheduling system. A master schedule covers long-range, mid-range, near-real-time, and real-time scheduling time frames all in one, rather than the current method of separate functions that are supported by different processes and tools. CRANE also provides private workspaces (both dynamic and static), data sharing, scenario management, user control, rapid messaging (based on Java Message Service), data/time synchronization, workflow management, notification (including emails), conflict checking, and a linkage to a schedule generation engine. The data structure with corresponding database design combines object trees with multiple associated mortal instances and relational database to provide unprecedented traceability and simplify the existing DSN XML schedule representation. These technologies are used to provide traceability, schedule negotiation, conflict resolution, and load forecasting from real-time operations to long-range loading analysis up to 20 years in the future. CRANE includes a database, a stored procedure layer, an agent-based middle tier, a Web service wrapper, a Windows Integrated Analysis Environment (IAE), a Java application, and a Web page interface.
Getting Defense Acquisition Right
2017-01-01
cost increases, schedule slips , and sometimes failure to deliver an acceptable or 8 Getting Defense Acquisition Right affordable...did not make any allowance for overruns, schedule slips , or increases in costs for services beyond the standard indices assumed by the Office of...that we are not taking enough risks. With respect to our major programs, I find myself pushed in two directions simultaneously by the political winds
An Experimental Study of Scheduling and Duration of "Tier 2" First-Grade Reading Intervention
ERIC Educational Resources Information Center
Denton, Carolyn A.; Cirino, Paul T.; Barth, Amy E.; Romain, Melissa; Vaughn, Sharon; Wexler, Jade; Francis, David J.; Fletcher, Jack M.
2011-01-01
This study compared the effects on reading outcomes of delivering supplemental, small-group intervention to first-grade students at risk for reading difficulties randomly assigned to one of three different treatment schedules: extended (4 sessions per week, 16 weeks; n = 66), concentrated (4 sessions per week, 8 weeks; n = 64), or distributed (2…
ERIC Educational Resources Information Center
Mahoney, Joseph L.; Vest, Andrea E.
2012-01-01
Concern exists that youth who spend a lot of time participating in organized out-of-school activities (e.g., sports) are at-risk for poor developmental outcomes. This concern--called the over-scheduling hypothesis--has primarily been assessed in terms of adolescent adjustment. This longitudinal study of a nationally representative sample of 1,115…
Report of the Cost Assessment and Validation Task Force on the International Space Station
NASA Technical Reports Server (NTRS)
1998-01-01
The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.
Cost Assessment and Validation Task Force on the International Space Station
NASA Technical Reports Server (NTRS)
1998-01-01
The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.
Particle swarm optimization based space debris surveillance network scheduling
NASA Astrophysics Data System (ADS)
Jiang, Hai; Liu, Jing; Cheng, Hao-Wen; Zhang, Yao
2017-02-01
The increasing number of space debris has created an orbital debris environment that poses increasing impact risks to existing space systems and human space flights. For the safety of in-orbit spacecrafts, we should optimally schedule surveillance tasks for the existing facilities to allocate resources in a manner that most significantly improves the ability to predict and detect events involving affected spacecrafts. This paper analyzes two criteria that mainly affect the performance of a scheduling scheme and introduces an artificial intelligence algorithm into the scheduling of tasks of the space debris surveillance network. A new scheduling algorithm based on the particle swarm optimization algorithm is proposed, which can be implemented in two different ways: individual optimization and joint optimization. Numerical experiments with multiple facilities and objects are conducted based on the proposed algorithm, and simulation results have demonstrated the effectiveness of the proposed algorithm.
Cheung, Ivan; Braver, Elisa R.
2012-01-01
Widely-publicized fatal motorcoach crashes have caused public concern about their safety. This study estimated crash and violation rates among interstate motorcoach carriers based on 2005–2011 data obtained from the Federal Motor Carrier Safety Administration (FMCSA). Motorcoach carriers with relatively high crash and violation rates were compared with those with better safety records. The principal component analysis produced three orthogonal factors that captured the majority (63 percent) of the total variance in the data set. Motorcoach carriers operating 10 or fewer motorcoaches were more likely to be classified in both the high crash rate and the high inspection and violation rates group. Those carriers with 10 or fewer years in business were more likely to be classified in the high inspection and violation rates group. The vast majority of motorcoach carriers with problematic safety records were non-scheduled route providers (charters). Scheduled-service motorcoach carriers identified as providing at least occasional curbside service, defined as picking up or dropping off passengers at a place other than a traditional terminal at the origin or destination, had an increased risk of involvement in fatal crashes compared with other scheduled-service carriers (1.4 per 100 vehicles, 95% C.I.: 0.1–2.7 versus 0.2, 95% C.I.: 0.0–0.5). The data did not indicate whether crashes or violations occurred during the trips where curbside service was provided. These findings suggest that FMCSA and the states need to have the resources necessary for close monitoring of motorcoach carriers, particularly high-risk ones such as small and less experienced motorcoach carriers. PMID:23169116
Manned Mars Mission program concepts
NASA Technical Reports Server (NTRS)
Hamilton, E. C.; Johnson, P.; Pearson, J.; Tucker, W.
1988-01-01
This paper describes the SRS Manned Mars Mission and Program Analysis study designed to support a manned expedition to Mars contemplated by NASA for the purposes of initiating human exploration and eventual habitation of this planet. The capabilities of the interactive software package being presently developed by the SRS for the mission/program analysis are described, and it is shown that the interactive package can be used to investigate the impact of various mission concepts on the sensitivity of mass required in LEO, schedules, relative costs, and risk. The results, to date, indicate the need for an earth-to-orbit transportation system much larger than the present STS, reliable long-life support systems, and either advanced propulsion or aerobraking technology.
CYGNSS: Lessons We are Learning from a Class D Mission
NASA Technical Reports Server (NTRS)
Tumlinson, Jessica
2015-01-01
CYGNSS: Lessons Learned from NASA Class D Mission and how they selected their parts for the program to include balance between cost, risk, schedule and technology available as well as balancing cost restraints with mission risk profile.
Risk Management for the International Space Station
NASA Technical Reports Server (NTRS)
Sebastian, J.; Brezovic, Philip
2002-01-01
The International Space Station (ISS) is an extremely complex system, both technically and programmatically. The Space Station must support a wide range of payloads and missions. It must be launched in numerous launch packages and be safely assembled and operated in the harsh environment of space. It is being designed and manufactured by many organizations, including the prime contractor, Boeing, the NASA institutions, and international partners and their contractors. Finally, the ISS has multiple customers, (e.g., the Administration, Congress, users, public, international partners, etc.) with contrasting needs and constraints. It is the ISS Risk Management Office strategy to proactively and systematically manages risks to help ensure ISS Program success. ISS program follows integrated risk management process (both quantitative and qualitative) and is integrated into ISS project management. The process and tools are simple and seamless and permeate to the lowest levels (at a level where effective management can be realized) and follows the continuous risk management methodology. The risk process assesses continually what could go wrong (risks), determine which risks need to be managed, implement strategies to deal with those risks, and measure effectiveness of the implemented strategies. The process integrates all facets of risk including cost, schedule and technical aspects. Support analysis risk tools like PRA are used to support programatic decisions and assist in analyzing risks.
Parts and Components Reliability Assessment: A Cost Effective Approach
NASA Technical Reports Server (NTRS)
Lee, Lydia
2009-01-01
System reliability assessment is a methodology which incorporates reliability analyses performed at parts and components level such as Reliability Prediction, Failure Modes and Effects Analysis (FMEA) and Fault Tree Analysis (FTA) to assess risks, perform design tradeoffs, and therefore, to ensure effective productivity and/or mission success. The system reliability is used to optimize the product design to accommodate today?s mandated budget, manpower, and schedule constraints. Stand ard based reliability assessment is an effective approach consisting of reliability predictions together with other reliability analyses for electronic, electrical, and electro-mechanical (EEE) complex parts and components of large systems based on failure rate estimates published by the United States (U.S.) military or commercial standards and handbooks. Many of these standards are globally accepted and recognized. The reliability assessment is especially useful during the initial stages when the system design is still in the development and hard failure data is not yet available or manufacturers are not contractually obliged by their customers to publish the reliability estimates/predictions for their parts and components. This paper presents a methodology to assess system reliability using parts and components reliability estimates to ensure effective productivity and/or mission success in an efficient manner, low cost, and tight schedule.
A Comparison of Probabilistic and Deterministic Campaign Analysis for Human Space Exploration
NASA Technical Reports Server (NTRS)
Merrill, R. Gabe; Andraschko, Mark; Stromgren, Chel; Cirillo, Bill; Earle, Kevin; Goodliff, Kandyce
2008-01-01
Human space exploration is by its very nature an uncertain endeavor. Vehicle reliability, technology development risk, budgetary uncertainty, and launch uncertainty all contribute to stochasticity in an exploration scenario. However, traditional strategic analysis has been done in a deterministic manner, analyzing and optimizing the performance of a series of planned missions. History has shown that exploration scenarios rarely follow such a planned schedule. This paper describes a methodology to integrate deterministic and probabilistic analysis of scenarios in support of human space exploration. Probabilistic strategic analysis is used to simulate "possible" scenario outcomes, based upon the likelihood of occurrence of certain events and a set of pre-determined contingency rules. The results of the probabilistic analysis are compared to the nominal results from the deterministic analysis to evaluate the robustness of the scenario to adverse events and to test and optimize contingency planning.
Correlation between fertility drugs use and malignant melanoma incidence: the state of the art.
Tomao, Federica; Papa, Anselmo; Lo Russo, Giuseppe; Zuber, Sara; Spinelli, Gian Paolo; Rossi, Luigi; Caruso, Davide; Prinzi, Natalie; Stati, Valeria; Benedetti Panici, Pierluigi; Tomao, Silverio
2014-09-01
The relationship between fertility, reproductive hormones, and risk of malignant melanoma has acquired much interest in recent years. Melanocytes are hormonally responsive cells, and some in vitro studies demonstrated that estrogen hormones stimulate the growth of melanocytes. Moreover, estrogen receptors have been identified in melanoma cells, as well as in melanocytic nevi and in normal skin. Some evidences suggest a possible link between fertility treatments and the increased risk of malignant melanoma. This article addresses this association through a scrupulous search of the literature published thus far. The aim of this review is to determine the incidence of malignant melanoma in women treated with fertility drugs and to examine if the exposure to fertility treatments really increases the risk of malignant melanoma. In particular, our analysis focused on the different types of drugs and different treatment schedules used. Finally, this study provides additional insights regarding the long-term relationships between fertility drugs and the risk of malignant melanoma.
Luczynski, Kevin C; Hanley, Gregory P
2014-01-01
Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.
Avoiding burnout in an orthopaedic trauma practice.
Marsh, J Lawrence
2012-09-01
Burnout is characterized by emotional exhaustion, depersonalization, and decreased sense of personal accomplishment, and burnout has been very tightly linked with career dissatisfaction and other associated negative personal and professional consequences. Recently published studies indicate that among surgeons and surgical specialists, burnout is common, and that at least in some groups of surgeons, it has significant negative consequences for their practice and career. It is concerning that studies have found younger surgeons were at greater risk for burnout. There is no data on rates of, or risk for, burnout specifically for orthopaedic trauma surgeons. However, there are several reasons to expect the risk may be significant, including demanding call schedules and difficult to control work schedules. There are some common-sense guidelines to minimize the chances of burnout in the early stages of an orthopaedic trauma career. One of the most important is to set up a work schedule that allows personal pursuits, including time with significant other and family away from work. Achieving and maintaining a balance between work and home will optimize the chances of achieving the tremendous satisfaction possible in an orthopaedic trauma career and minimize the chances of burnout.
[Job demands and work-family conflict in a health care staff. The role of work shifts].
Zito, Margherita; Colombo, Lara; Mura, Gabriella
2013-01-01
Work-family conflict (wfc), that originates from an incompatibility between the job and the family demands, is a very relevant topic in health care context, as suggested by NEXT study. Work overload and schedule organization are dimensions that can affect wfc, and particularly, studies indicate work shifts as one of its main determinants, as they limit the work-family balance and represent one of the prime risk factors for workers' health. The aim of this study was to detect the role of some job demands (both general and specific) and of schedule organization in determining the wfc experience, with particular attention to work shifts. Respondents to our questionnaire are 207 nurses of a north Italian public health organization. They are mostly women (92.8%) and their average age is 42. Data analysis shows that wfc is mostly influenced by work shifts, but also by work overload, cognitive load and by on-call availability. Staff working on shifts and on-call availability perceive a higher wfc than their colleagues without work shifts and on-call availability. The central role of work shifts in determining wfc suggests the need to act on schedule organization and on training programs for supervisors and workers.
Design Considerations for a New Terminal Area Arrival Scheduler
NASA Technical Reports Server (NTRS)
Thipphavong, Jane; Mulfinger, Daniel
2010-01-01
Design of a terminal area arrival scheduler depends on the interrelationship between throughput, delay and controller intervention. The main contribution of this paper is an analysis of the above interdependence for several stochastic behaviors of expected system performance distributions in the aircraft s time of arrival at the meter fix and runway. Results of this analysis serve to guide the scheduler design choices for key control variables. Two types of variables are analyzed, separation buffers and terminal delay margins. The choice for these decision variables was tested using sensitivity analysis. Analysis suggests that it is best to set the separation buffer at the meter fix to its minimum and adjust the runway buffer to attain the desired system performance. Delay margin was found to have the least effect. These results help characterize the variables most influential in the scheduling operations of terminal area arrivals.
Matching Judicial Supervision to Clients' Risk Status in Drug Court
ERIC Educational Resources Information Center
Marlowe, Douglas B.; Festinger, David S.; Lee, Patricia A.; Dugosh, Karen L.; Benasutti, Kathleen M.
2006-01-01
This article reports outcomes from a program of experimental research evaluating the risk principle in drug courts. Prior studies revealed that participants who were high risk and had (a) antisocial personality disorder or (b) a prior history of drug abuse treatment performed better in drug court when scheduled to attend biweekly judicial status…
Identification and Classification of Common Risks in Space Science Missions
NASA Technical Reports Server (NTRS)
Hihn, Jairus M.; Chattopadhyay, Debarati; Hanna, Robert A.; Port, Daniel; Eggleston, Sabrina
2010-01-01
Due to the highly constrained schedules and budgets that NASA missions must contend with, the identification and management of cost, schedule and risks in the earliest stages of the lifecycle is critical. At the Jet Propulsion Laboratory (JPL) it is the concurrent engineering teams that first address these items in a systematic manner. Foremost of these concurrent engineering teams is Team X. Started in 1995, Team X has carried out over 1000 studies, dramatically reducing the time and cost involved, and has been the model for other concurrent engineering teams both within NASA and throughout the larger aerospace community. The ability to do integrated risk identification and assessment was first introduced into Team X in 2001. Since that time the mission risks identified in each study have been kept in a database. In this paper we will describe how the Team X risk process is evolving highlighting the strengths and weaknesses of the different approaches. The paper will especially focus on the identification and classification of common risks that have arisen during Team X studies of space based science missions.
Mixed Criticality Scheduling for Industrial Wireless Sensor Networks
Jin, Xi; Xia, Changqing; Xu, Huiting; Wang, Jintao; Zeng, Peng
2016-01-01
Wireless sensor networks (WSNs) have been widely used in industrial systems. Their real-time performance and reliability are fundamental to industrial production. Many works have studied the two aspects, but only focus on single criticality WSNs. Mixed criticality requirements exist in many advanced applications in which different data flows have different levels of importance (or criticality). In this paper, first, we propose a scheduling algorithm, which guarantees the real-time performance and reliability requirements of data flows with different levels of criticality. The algorithm supports centralized optimization and adaptive adjustment. It is able to improve both the scheduling performance and flexibility. Then, we provide the schedulability test through rigorous theoretical analysis. We conduct extensive simulations, and the results demonstrate that the proposed scheduling algorithm and analysis significantly outperform existing ones. PMID:27589741
A computer method for schedule processing and quick-time updating.
NASA Technical Reports Server (NTRS)
Mccoy, W. H.
1972-01-01
A schedule analysis program is presented which can be used to process any schedule with continuous flow and with no loops. Although generally thought of as a management tool, it has applicability to such extremes as music composition and computer program efficiency analysis. Other possibilities for its use include the determination of electrical power usage during some operation such as spacecraft checkout, and the determination of impact envelopes for the purpose of scheduling payloads in launch processing. At the core of the described computer method is an algorithm which computes the position of each activity bar on the output waterfall chart. The algorithm is basically a maximal-path computation which gives to each node in the schedule network the maximal path from the initial node to the given node.
Cumulative exposure to shift work and sickness absence: associations in a five-year historic cohort.
van Drongelen, Alwin; Boot, Cécile R L; Hlobil, Hynek; van der Beek, Allard J; Smid, Tjabe
2017-01-11
Exposure to shift work has been associated with negative health consequences, although the association between shift work and sickness absence remains unclear. The aim of this study is to investigate associations between cumulative exposure to shift work and sickness absence among ground staff employees of an airline company. This study used data from the MORE (Monitoring Occupational Health Risks in Employees) cohort, which is a 5-year historic cohort. The population of the present study consisted of 7562 ground staff employees. For each employee, work schedules and sickness absence days between 2005 and 2009 were obtained from company records. For the exposure to different shift schedule types and to the cumulative number of night shifts, the association with long-term sickness absence (>7 consecutive sickness absence days) and the number of sickness absence episodes during 2009, was calculated using logistic and Poisson regression analyses. Socio-demographic variables, work-related variables, job classification variables, and previous sickness absence days were regarded as confounders. After adjusting for previous sickness absence and job classification variables, only the group of employees that switched into working in a three-shift schedule, showed a significantly increased risk for long-term sickness absence (OR = 1.31, 95%CI 1.02-1.69). Night shift exposure was not significantly associated with long-term sickness absence. Exposure to shift work was negatively associated with more sickness absence episodes. Employees who were exposed to more than 46 night shifts also showed a lower risk for more sickness absence episodes. Subgroup analyses showed that single employees and employees without children had an increased risk for long-term sickness absence when exposed to a three-shift schedule, and when they had changed between shift schedule types. Cumulative exposure to shift work proved to be negatively associated with more sickness absence episodes, and was not associated with more long-term sickness absence, although selection bias could not be ruled out. Future research should explore the influence of household composition, and take into account both previous sickness absence and psychosocial and physical work factors to obtain a better estimation of the association between shift work and sickness absence.
Vaccher, Stefanie J; Gianacas, Christopher; Templeton, David J; Poynten, Isobel M; Haire, Bridget G; Ooi, Catriona; Foster, Rosalind; McNulty, Anna; Grulich, Andrew E; Zablotska, Iryna B
2017-01-01
The effectiveness of daily pre-exposure prophylaxis (PrEP) is well established. However, there has been increasing interest in non-daily dosing schedules among gay and bisexual men (GBM). This paper explores preferences for PrEP dosing schedules among GBM at baseline in the PRELUDE demonstration project. Individuals at high-risk of HIV were enrolled in a free PrEP demonstration project in New South Wales, Australia, between November 2014 and April 2016. At baseline, they completed an online survey containing detailed behavioural, demographic, and attitudinal questions, including their ideal way to take PrEP: daily (one pill taken every day), event-driven (pills taken only around specific risk events), or periodic (daily dosing during periods of increased risk). Overall, 315 GBM (98% of study sample) provided a preferred PrEP dosing schedule at baseline. One-third of GBM expressed a preference for non-daily PrEP dosing: 20% for event-driven PrEP, and 14% for periodic PrEP. Individuals with a trade/vocational qualification were more likely to prefer periodic to daily PrEP [adjusted odds ratio (aOR) = 4.58, 95% confidence intervals (95% CI): (1.68, 12.49)], compared to individuals whose highest level of education was high school. Having an HIV-positive main regular partner was associated with strong preference for daily, compared to event-driven PrEP [aOR = 0.20, 95% CI: (0.04, 0.87)]. Participants who rated themselves better at taking medications were more likely to prefer daily over periodic PrEP [aOR = 0.39, 95% CI: (0.20, 0.76)]. Individuals' preferences for PrEP schedules are associated with demographic and behavioural factors that may impact on their ability to access health services and information about PrEP and patterns of HIV risk. At the time of data collection, there were limited data available about the efficacy of non-daily PrEP schedules, and clinicians only recommended daily PrEP to study participants. Further research investigating how behaviours and PrEP preferences change correspondingly over time is needed. ClinicalTrials.gov NCT02206555. Registered 28 July 2014.
Training and certification of work schedule managers may improve shift scheduling practices
DOT National Transportation Integrated Search
2011-02-01
The Federal Railroad Administration (FRA) Human Factors Research and Development (R&D) Program : sponsored the implementation of a strategic job analysis to investigate the job of work schedule managers : (WSMs) across a diverse range of industries t...
NASA Technical Reports Server (NTRS)
Jr., R. F. Miles
1995-01-01
Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.
Risk management analysis for construction of Kutai Kartanegara bridge-East Kalimantan-Indonesia
NASA Astrophysics Data System (ADS)
Azis, Subandiyah
2017-11-01
Many sources of risk that may impede the achievement of the project objectives through either cost or quality and time, especially for bridges that have collapsed before, so when the implementation of possible hazard / high hazard so when should the possible hazard/high hazard be implemented The purpose of this research is to identify, to analyze risks by classifying the risks using the method of Risk Breakdown Structure (RBS) and managing the dominant risk of execution of the installation work to determine the handling of the steel frame in order to maximize the positive and minimize the incidence of adverse events. The results of this study indicate there are 15 sources of risks are identified, and there are 6 risk indicates the dominant risks. Mitigation performed on the dominant risks unacceptable i.e. Project factor that shows the delays in the arrival of materials due to locations, schedule of the arrival of materials should be tailored to the needs of the field and the amount of material that comes with the required field should also be evaluated. The result is expected to be a guideline for identifying risks and mitigation measures for further research. Subsequent researchers to pay attention on the security factor that implementation time does not affect the productivity of work in construction projects.
Hu, Yu; Li, Qian; Chen, Yaping
2017-09-20
Background: this study aimed to assess both immunization coverage and timeliness, as well as reasons for non-vaccination, and identity the risk factors of delayed immunization, for the vaccines scheduled during the first year of life, in Zhejiang province, east China. Methods: A cluster survey among children aged 24-35 months was conducted. Demographic information and socio-economic characteristics of the selected child, the mother, and the household were collected. Immunization data were transcribed from immunization cards. Timeliness was assessed with Kaplan-Meier analysis for each vaccine given before 12 months of age, based on the time frame stipulated by the expanded program on immunization of China. Cox proportional hazard regression was applied to identify risk factors of delayed immunization. Results: A total of 2772 eligible children were surveyed. The age-appropriate coverage ranged from 25.4% (95% CI: 23.7-27.0%) for Bacillus Calmette-Guerin (BCG) to 91.3% (95% CI: 90.2-92.3%) for the first dose of oral poliomyelitis vaccine (OPV1). The most frequent reason for non-vaccination was parent's fear of adverse events of immunization. Delayed immunizations were associated with mother having a lower education level, mother having a job, delivery at home, increasing number of children per household, and having a lower household income. Conclusions: Although the timeliness of immunization has improved since 2011, necessary steps are still needed to achieve further improvement. Timeliness of immunization should be considered as another important indicator of expanded program on immunization (EPI) performance. Future interventions on vaccination coverage should take into consideration demographic and socio-economic risk factors identified in this study. The importance of adhering to the recommended schedule should be explained to parents.
Hu, Yu; Li, Qian; Chen, Yaping
2017-01-01
Background: this study aimed to assess both immunization coverage and timeliness, as well as reasons for non-vaccination, and identity the risk factors of delayed immunization, for the vaccines scheduled during the first year of life, in Zhejiang province, east China. Methods: A cluster survey among children aged 24–35 months was conducted. Demographic information and socio-economic characteristics of the selected child, the mother, and the household were collected. Immunization data were transcribed from immunization cards. Timeliness was assessed with Kaplan–Meier analysis for each vaccine given before 12 months of age, based on the time frame stipulated by the expanded program on immunization of China. Cox proportional hazard regression was applied to identify risk factors of delayed immunization. Results: A total of 2772 eligible children were surveyed. The age-appropriate coverage ranged from 25.4% (95% CI: 23.7–27.0%) for Bacillus Calmette–Guerin (BCG) to 91.3% (95% CI: 90.2–92.3%) for the first dose of oral poliomyelitis vaccine (OPV1). The most frequent reason for non-vaccination was parent’s fear of adverse events of immunization. Delayed immunizations were associated with mother having a lower education level, mother having a job, delivery at home, increasing number of children per household, and having a lower household income. Conclusions: Although the timeliness of immunization has improved since 2011, necessary steps are still needed to achieve further improvement. Timeliness of immunization should be considered as another important indicator of expanded program on immunization (EPI) performance. Future interventions on vaccination coverage should take into consideration demographic and socio-economic risk factors identified in this study. The importance of adhering to the recommended schedule should be explained to parents. PMID:28930165
A comparison of analysis methods to estimate contingency strength.
Lloyd, Blair P; Staubitz, Johanna L; Tapp, Jon T
2018-05-09
To date, several data analysis methods have been used to estimate contingency strength, yet few studies have compared these methods directly. To compare the relative precision and sensitivity of four analysis methods (i.e., exhaustive event-based, nonexhaustive event-based, concurrent interval, concurrent+lag interval), we applied all methods to a simulated data set in which several response-dependent and response-independent schedules of reinforcement were programmed. We evaluated the degree to which contingency strength estimates produced from each method (a) corresponded with expected values for response-dependent schedules and (b) showed sensitivity to parametric manipulations of response-independent reinforcement. Results indicated both event-based methods produced contingency strength estimates that aligned with expected values for response-dependent schedules, but differed in sensitivity to response-independent reinforcement. The precision of interval-based methods varied by analysis method (concurrent vs. concurrent+lag) and schedule type (continuous vs. partial), and showed similar sensitivities to response-independent reinforcement. Recommendations and considerations for measuring contingencies are identified. © 2018 Society for the Experimental Analysis of Behavior.
ERIC Educational Resources Information Center
Ukrainetz, Teresa A.; Ross, Catherine L.; Harm, Heide M.
2009-01-01
Purpose: This study examined 2 schedules of treatment for phonemic awareness. Method: Forty-one 5- to 6-year-old kindergartners, including 22 English learners, with low letter-name and first-sound knowledge received 11 hr of phonemic awareness treatment: concentrated (CP, 3x/wk to December), dispersed (DP, 1x/wk to March), and dispersed vocabulary…
Code of Federal Regulations, 2014 CFR
2014-04-01
... boldface roman type at least as large as ten-point modern type and at least two points leaded: “THESE... discussing the material risks involved in purchasing the securities, printed in bold-face roman type at least... the city and state for address of portfolio companies. 2. State the value as of date of balance sheet...
Code of Federal Regulations, 2011 CFR
2011-04-01
... boldface roman type at least as large as ten-point modern type and at least two points leaded: “THESE... discussing the material risks involved in purchasing the securities, printed in bold-face roman type at least... the city and state for address of portfolio companies. 2. State the value as of date of balance sheet...
Code of Federal Regulations, 2012 CFR
2012-04-01
... boldface roman type at least as large as ten-point modern type and at least two points leaded: “THESE... discussing the material risks involved in purchasing the securities, printed in bold-face roman type at least... the city and state for address of portfolio companies. 2. State the value as of date of balance sheet...
Code of Federal Regulations, 2013 CFR
2013-04-01
... boldface roman type at least as large as ten-point modern type and at least two points leaded: “THESE... discussing the material risks involved in purchasing the securities, printed in bold-face roman type at least... the city and state for address of portfolio companies. 2. State the value as of date of balance sheet...
Measuring the effects of heterogeneity on distributed systems
NASA Technical Reports Server (NTRS)
El-Toweissy, Mohamed; Zeineldine, Osman; Mukkamala, Ravi
1991-01-01
Distributed computer systems in daily use are becoming more and more heterogeneous. Currently, much of the design and analysis studies of such systems assume homogeneity. This assumption of homogeneity has been mainly driven by the resulting simplicity in modeling and analysis. A simulation study is presented which investigated the effects of heterogeneity on scheduling algorithms for hard real time distributed systems. In contrast to previous results which indicate that random scheduling may be as good as a more complex scheduler, this algorithm is shown to be consistently better than a random scheduler. This conclusion is more prevalent at high workloads as well as at high levels of heterogeneity.
2010-01-01
Background Heavy vehicle transportation continues to grow internationally; yet crash rates are high, and the risk of injury and death extends to all road users. The work environment for the heavy vehicle driver poses many challenges; conditions such as scheduling and payment are proposed risk factors for crash, yet the precise measure of these needs quantifying. Other risk factors such as sleep disorders including obstructive sleep apnoea have been shown to increase crash risk in motor vehicle drivers however the risk of heavy vehicle crash from this and related health conditions needs detailed investigation. Methods and Design The proposed case control study will recruit 1034 long distance heavy vehicle drivers: 517 who have crashed and 517 who have not. All participants will be interviewed at length, regarding their driving and crash history, typical workloads, scheduling and payment, trip history over several days, sleep patterns, health, and substance use. All participants will have administered a nasal flow monitor for the detection of obstructive sleep apnoea. Discussion Significant attention has been paid to the enforcement of legislation aiming to deter problems such as excess loading, speeding and substance use; however, there is inconclusive evidence as to the direction and strength of associations of many other postulated risk factors for heavy vehicle crashes. The influence of factors such as remuneration and scheduling on crash risk is unclear; so too the association between sleep apnoea and the risk of heavy vehicle driver crash. Contributory factors such as sleep quality and quantity, body mass and health status will be investigated. Quantifying the measure of effect of these factors on the heavy vehicle driver will inform policy development that aims toward safer driving practices and reduction in heavy vehicle crash; protecting the lives of many on the road network. PMID:20338064
NASA Astrophysics Data System (ADS)
Royle, J.
2016-02-01
For an offshore renewables plant to be viable it must be safe and cost effective to build and maintain (i.e. the conditions mustn't be too harsh to excessively impede operations at the site), it must also have an energetic enough resource to make the project attractive to investors. In order to strike the correct balance between cost and resource reliable datasets describing the meteorological and oceanographic (metocean) environment needs to be collected, analysed and its findings correctly applied . This presentation will use three real world examples from Iberdrola`s portfolio of offshore windfarms in Europe to demonstrate the economic benefits of good quality metocean data and robust analysis. The three examples are: 1) Moving from traditional frequency domain persistence statistics to time domain installation schedules driven by reliable metocean data reduces uncertainty and allows the developer to have better handle on weather risk during contract negotiations. 2) By comparing the planned installation schedules from a well validated metocean dataset with a coarser low cost unvalidated metocean dataset we can show that each Euro invested in the quality of metocean data can reduce the uncertainty in installation schedules by four Euros. 3) Careful consideration of co-varying wave and tidal parameters can justify lower cost designs, such as lower platform levels leading to shorter and cheaper offshore wind turbine foundations. By considering the above examples we will prove the case for investing in analysis of well validated metocean models as a basis for sound financial planning of offshore renewables installations.
The nurse scheduling problem: a goal programming and nonlinear optimization approaches
NASA Astrophysics Data System (ADS)
Hakim, L.; Bakhtiar, T.; Jaharuddin
2017-01-01
Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.
Multi-time Scale Joint Scheduling Method Considering the Grid of Renewable Energy
NASA Astrophysics Data System (ADS)
Zhijun, E.; Wang, Weichen; Cao, Jin; Wang, Xin; Kong, Xiangyu; Quan, Shuping
2018-01-01
Renewable new energy power generation prediction error like wind and light, brings difficulties to dispatch the power system. In this paper, a multi-time scale robust scheduling method is set to solve this problem. It reduces the impact of clean energy prediction bias to the power grid by using multi-time scale (day-ahead, intraday, real time) and coordinating the dispatching power output of various power supplies such as hydropower, thermal power, wind power, gas power and. The method adopts the robust scheduling method to ensure the robustness of the scheduling scheme. By calculating the cost of the abandon wind and the load, it transforms the robustness into the risk cost and optimizes the optimal uncertainty set for the smallest integrative costs. The validity of the method is verified by simulation.
IV&V Project Assessment Process Validation
NASA Technical Reports Server (NTRS)
Driskell, Stephen
2012-01-01
The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, Yuping; Zheng, Qipeng P.; Wang, Jianhui
2014-11-01
tThis paper presents a two-stage stochastic unit commitment (UC) model, which integrates non-generation resources such as demand response (DR) and energy storage (ES) while including riskconstraints to balance between cost and system reliability due to the fluctuation of variable genera-tion such as wind and solar power. This paper uses conditional value-at-risk (CVaR) measures to modelrisks associated with the decisions in a stochastic environment. In contrast to chance-constrained modelsrequiring extra binary variables, risk constraints based on CVaR only involve linear constraints and con-tinuous variables, making it more computationally attractive. The proposed models with risk constraintsare able to avoid over-conservative solutions butmore » still ensure system reliability represented by loss ofloads. Then numerical experiments are conducted to study the effects of non-generation resources ongenerator schedules and the difference of total expected generation costs with risk consideration. Sen-sitivity analysis based on reliability parameters is also performed to test the decision preferences ofconfidence levels and load-shedding loss allowances on generation cost reduction.« less
A Cost Comparison Between Active and Naval Reserve Force FFG 7 Class Ships
1993-06-01
so in our hypothetical depreciation schedule 1/30th of the depreciable cost would be expensed each year. Under GAAP , the historical cost of the asset...and Support Costs (VAMOSC) data base provided by the* aval Center For Cost Analysis. The thesis also sets up theoretical depreciation schedules for...VAMOSC) data base provided by the Naval Center for Cost Analysis. The thesis also sets up theoretical depreciation schedules for selected ships to
Nonstandard working schedules and health: the systematic search for a comprehensive model.
Merkus, Suzanne L; Holte, Kari Anne; Huysmans, Maaike A; van Mechelen, Willem; van der Beek, Allard J
2015-10-23
Theoretical models on shift work fall short of describing relevant health-related pathways associated with the broader concept of nonstandard working schedules. Shift work models neither combine relevant working time characteristics applicable to nonstandard schedules nor include the role of rest periods and recovery in the development of health complaints. Therefore, this paper aimed to develop a comprehensive model on nonstandard working schedules to address these shortcomings. A literature review was conducted using a systematic search and selection process. Two searches were performed: one associating the working time characteristics time-of-day and working time duration with health and one associating recovery after work with health. Data extracted from the models were used to develop a comprehensive model on nonstandard working schedules and health. For models on the working time characteristics, the search strategy yielded 3044 references, of which 26 met the inclusion criteria that contained 22 distinctive models. For models on recovery after work, the search strategy yielded 896 references, of which seven met the inclusion criteria containing seven distinctive models. Of the models on the working time characteristics, three combined time-of-day with working time duration, 18 were on time-of-day (i.e. shift work), and one was on working time duration. The model developed in the paper has a comprehensive approach to working hours and other work-related risk factors and proposes that they should be balanced by positive non-work factors to maintain health. Physiological processes leading to health complaints are circadian disruption, sleep deprivation, and activation that should be counterbalanced by (re-)entrainment, restorative sleep, and recovery, respectively, to maintain health. A comprehensive model on nonstandard working schedules and health was developed. The model proposes that work and non-work as well as their associated physiological processes need to be balanced to maintain good health. The model gives researchers a useful overview over the various risk factors and pathways associated with health that should be considered when studying any form of nonstandard working schedule.
Quarterly Update: July-September 1990
1990-09-01
drafted a report that defines the process and the products of a feature oriented domain analysis ( FODA ) and provides a sample do- main analysis . This...receive ............... training to offer assessment services commercially. This section provides NASA adopted the rate monotonic scheduling analysis ...that the rate monotonic scheduling analysis approach will be the JulySeptember 1990 baseline methodology for its hard real-time operating system
Joint Strike Figher Acquisition: Mature Critical Technologies Needed to Reduce Risks
2001-10-01
Reduce Risks GAO-02-39 Report Documentation Page Report Date 00OCT2001 Report Type N/A Dates Covered (from... to) - Title and Subtitle JOINT STRIKE...FIGHTER ACQUISITION: Mature Critical Technologies Needed to Reduce Risks Contract Number Grant Number Program Element Number Author(s) Project...1Joint Strike Fighter Acquisition: Development Schedule Should Be Changed to Reduce Risks (GAO/T-NSIAD-00-132
[The Japanese Health Care System: An Analysis of the Funding and Reimbursement System].
Rump, Alexis; Schöffski, Oliver
2017-08-10
Objective The modern Japanese health care system was established during the Meiji period (1868-1912) using the example of Germany. In this paper, the funding and remuneration of health services and products in Japan are described. The focus lies on the mechanisms used to implement health policy goals and to control costs. Method Selective literature search. Results All permanent residents in Japan are enrolled in one of more than 3,000 compulsory health funds. Employees and public servants are covered through company or government-related health insurance schemes. Independent workers, the unemployed and the pensioners are usually assigned to health insurance plans managed by local city governments. The elderly over 75 years are insured through special health funds managed at the prefectural level. To correct the fiscal disparities among the health insurance programs, a risk adjustment is realized by compensatory financial transfers between the funds and substantial subsidies from the central and local governments. The statutory benefits package that is identical for all insurance plans is regulated in a single comprehensive schedule. All the covered health services and products are listed with the fees and compensations, and the conditions for the service providers to be remunerated are also stated. This fee and compensation schedule is regularly revised every 2 years under the leadership of the Ministry of Health, Labor and Welfare. The revisions are intended to contain health expenditures and to set incentives for the achievement of health policy goals. Conclusion The funding of the Japanese health care system and the risk adjustment mechanisms among health funds are well established and show a rather static character. The short- and mid-term development of the system is mainly controlled on the side of the expenditures through the unique and comprehensive fee and compensation schedule. The regular revisions of this schedule permit to react at relatively short notice to evolving situations, and through a policy of small improvements, target an optimization of the system as a whole. © Georg Thieme Verlag KG Stuttgart · New York.
Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan
NASA Technical Reports Server (NTRS)
1994-01-01
This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.
Study on ecological regulation of coastal plain sluice
NASA Astrophysics Data System (ADS)
Yu, Wengong; Geng, Bing; Yu, Huanfei; Yu, Hongbo
2018-02-01
Coastal plains are densely populated and economically developed, therefore their importance is self-evident. However, there are some problems related with water in coastal plains, such as low flood control capacity and severe water pollution. Due to complicated river network hydrodynamic force, changeable flow direction and uncertain flood concentration and propagation mechanism, it is rather difficult to use sluice scheduling to realize flood control and tackle water pollution. On the base of the measured hydrological data during once-in-a-century Fitow typhoon in 2013 in Yuyao city, by typical analysis, theoretical analysis and process simulation, some key technologies were researched systematically including plain river network sluice ecological scheduling, “one tide” flood control and drainage scheduling and ecological running water scheduling. In the end, single factor health diagnostic evaluation, unit hydrograph of plain water level and evening tide scheduling were put forward.
Correlational Study of Risk Management and Information Technology Project Success
ERIC Educational Resources Information Center
Gillespie, Seth J.
2014-01-01
Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…
Code of Federal Regulations, 2011 CFR
2011-01-01
... classifications and total consolidated holding company assets. OTS will establish these schedules in a Thrift Bulletin. (b) For the purposes of this section, the holding company risk/complexity classification is the most recent risk/complexity classification of which OTS notified the savings and loan holding company...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
... implementing Title VII, the Commission should focus first on systemic risk issues and then issues relating to... implementation of the Clearing Requirement will serve to reduce systemic risk by mitigating counterparty credit... non-financial end-users because they do not pose systemic risk, and, therefore, should be given the...
NASA Astrophysics Data System (ADS)
Leonardi, Marcelo
The primary purpose of this study was to examine the impact of a scheduling change from a trimester 4x4 block schedule to a modified hybrid schedule on student achievement in ninth grade biology courses. This study examined the impact of the scheduling change on student achievement through teacher created benchmark assessments in Genetics, DNA, and Evolution and on the California Standardized Test in Biology. The secondary purpose of this study examined the ninth grade biology teacher perceptions of ninth grade biology student achievement. Using a mixed methods research approach, data was collected both quantitatively and qualitatively as aligned to research questions. Quantitative methods included gathering data from departmental benchmark exams and California Standardized Test in Biology and conducting multiple analysis of covariance and analysis of covariance to determine significance differences. Qualitative methods include journal entries questions and focus group interviews. The results revealed a statistically significant increase in scores on both the DNA and Evolution benchmark exams. DNA and Evolution benchmark exams showed significant improvements from a change in scheduling format. The scheduling change was responsible for 1.5% of the increase in DNA benchmark scores and 2% of the increase in Evolution benchmark scores. The results revealed a statistically significant decrease in scores on the Genetics Benchmark exam as a result of the scheduling change. The scheduling change was responsible for 1% of the decrease in Genetics benchmark scores. The results also revealed a statistically significant increase in scores on the CST Biology exam. The scheduling change was responsible for .7% of the increase in CST Biology scores. Results of the focus group discussions indicated that all teachers preferred the modified hybrid schedule over the trimester schedule and that it improved student achievement.
An Analysis of Task-Scheduling for a Generic Avionics Mission Computer
2006-04-01
3 3. 1. 3 Response Time Analysis........................................................................... 8 3. 2 Non - Preemptive ...Fixed Priority Scheduling ...................................................... 10 3. 2. 1 Simple Non - Preemptive Response Time Test...10 3. 2. 2 Non - Preemptive Response Time Test .................................................. 12 3. 3 Asynchronous Fixed
Model-based optimization of G-CSF treatment during cytotoxic chemotherapy.
Schirm, Sibylle; Engel, Christoph; Loibl, Sibylle; Loeffler, Markus; Scholz, Markus
2018-02-01
Although G-CSF is widely used to prevent or ameliorate leukopenia during cytotoxic chemotherapies, its optimal use is still under debate and depends on many therapy parameters such as dosing and timing of cytotoxic drugs and G-CSF, G-CSF pharmaceuticals used and individual risk factors of patients. We integrate available biological knowledge and clinical data regarding cell kinetics of bone marrow granulopoiesis, the cytotoxic effects of chemotherapy and pharmacokinetics and pharmacodynamics of G-CSF applications (filgrastim or pegfilgrastim) into a comprehensive model. The model explains leukocyte time courses of more than 70 therapy scenarios comprising 10 different cytotoxic drugs. It is applied to develop optimized G-CSF schedules for a variety of clinical scenarios. Clinical trial results showed validity of model predictions regarding alternative G-CSF schedules. We propose modifications of G-CSF treatment for the chemotherapies 'BEACOPP escalated' (Hodgkin's disease), 'ETC' (breast cancer), and risk-adapted schedules for 'CHOP-14' (aggressive non-Hodgkin's lymphoma in elderly patients). We conclude that we established a model of human granulopoiesis under chemotherapy which allows predictions of yet untested G-CSF schedules, comparisons between them, and optimization of filgrastim and pegfilgrastim treatment. As a general rule of thumb, G-CSF treatment should not be started too early and patients could profit from filgrastim treatment continued until the end of the chemotherapy cycle.
Analysis of Navy Flight Scheduling Methods Using FlyAwake
2009-09-01
28 Figure 4. FlyAwake Schedule Builder Screenshot..........................................................28...Figure 5. FlyAwake Work Schedule Builder Screenshot................................................29 Figure 6. FlyAwake Graphical Output Screenshot... disqualifies crewmembers from participating in the following day’s flight operations. These rules are subject to operational requirements and deviation
Methods for addressing "innocent bystanders" when evaluating safety of concomitant vaccines.
Wang, Shirley V; Abdurrob, Abdurrahman; Spoendlin, Julia; Lewis, Edwin; Newcomer, Sophia R; Fireman, Bruce; Daley, Matthew F; Glanz, Jason M; Duffy, Jonathan; Weintraub, Eric S; Kulldorff, Martin
2018-04-01
The need to develop methods for studying the safety of childhood immunization schedules has been recognized by the Institute of Medicine and Department of Health and Human Services. The recommended childhood immunization schedule includes multiple vaccines in a visit. A key concern is safety of concomitant (same day) versus separate day vaccination. This paper addresses a methodological challenge for observational studies using a self-controlled design to investigate the safety of concomitant vaccination. We propose a process for distinguishing which of several concomitantly administered vaccines is responsible for increased risk of an adverse event while adjusting for confounding due to relationships between effect modifying risk factors and concomitant vaccine combinations. We illustrate the approach by re-examining the known increase in risk of seizure 7 to 10 days after measles-mumps-rubella (MMR) vaccination and evaluating potential independent or modifying effects of other vaccines. Initial analyses suggested that DTaP had both an independent and potentiating effect on seizure. After accounting for the relationship between age at vaccination and vaccine combination, there was little evidence for increased risk of seizure with same day administration of DTaP and MMR; incidence rate ratio, 95% confidence interval 1.2 (0.9-1.6), P value = θ.226. We have shown that when using a self-controlled design to investigate safety of concomitant vaccination, it can be critically important to adjust for time-invariant effect modifying risk factors, such as age at time of vaccination, which are structurally related to vaccination patterns due to recommended immunization schedules. Copyright © 2018 John Wiley & Sons, Ltd.
Power Aware Distributed Systems
2004-01-01
detection or threshold functions to trigger the main CPU. The main processor can sleep and either wakeup on a schedule or by a positive threshold event...the RTOS must determine if wake-up latency can be tolerated (or, if it could be hidden by pre- wakeup ). The prediction accuracy for scheduling ...and processor shutdown/ wakeup . This analysis can be used to accurately analyze the schedulability of non-concrete periodic task sets, scheduled using
DOT National Transportation Integrated Search
2018-01-11
Background: Work schedules like those of Emergency Medical Services (EMS) personnel have been associated with increased risk of fatigue-related impairment. Biomathematical modeling is a means of objectively estimating the potential impacts of fatigue...
Space Shuttle Orbiter windshield bird impact analysis
NASA Technical Reports Server (NTRS)
Edelstein, Karen S.; Mccarty, Robert E.
1988-01-01
The NASA Space Shuttle Orbiter's windshield employs three glass panes separated by air gaps. The brittleness of the glass offers much less birdstrike energy-absorption capability than the laminated polycarbonate windshields of more conventional aircraft; attention must accordingly be given to the risk of catastrophic bird impact, and to methods of strike prevention that address bird populations around landing sites rather than the modification of the window's design. Bird populations' direct reduction, as well as careful scheduling of Orbiter landing times, are suggested as viable alternatives. The question of birdstrike-resistant glass windshield design for hypersonic aerospacecraft is discussed.
Lin Receives 2010 Natural Hazards Focus Group Award for Graduate Research
NASA Astrophysics Data System (ADS)
2010-11-01
Ning Lin has been awarded the Natural Hazards Focus Group Award for Graduate Research, given annually to a recent Ph.D. recipient for outstanding contributions to natural hazards research. Lin's thesis is entitled “Multi-hazard risk analysis related to hurricanes.” She is scheduled to present an invited talk in the Extreme Natural Events: Modeling, Prediction, and Mitigation session (NH20) during the 2010 AGU Fall Meeting, held 13-17 December in San Francisco, Calif. Lin will be formally presented with the award at the Natural Hazards focus group reception on 14 December 2010.
Risk of Contractors’ Claims On the Example of Road Works
NASA Astrophysics Data System (ADS)
Rybka, Iwona; Bondar-Nowakowska, Elżbieta; Pawluk, Katarzyna; Połoński, Mieczysław
2017-10-01
The aim of the study is to analyse claims filed by building contractors during the project implementation. The work is divided into two parts. In the first part problems associated with the management of claims in the construction process were discussed. Bearing in mind that claims may result in prolongation of the investment or exceeding planned budget, possibilities of applying information included in documents connected with claims procedure to risk management was analysed in the second part of the study. The basis of the analysis is a review of 226 documents. They originate from 8 construction sites completed in the last 5 years in southwestern Poland. In each case, these were linear road projects, executed by different contractors, according to conditions in the contract set out in the “Yellow Book” FIDIC. In the study, other documents relating events that according to contractors entitled them to claim were also analysed. They included among others: project documentation, terms of reference, construction log, reports and correspondence under the contract. The events constituting the reason for contractors` claims were classified according to their sources. 8 areas of potential threats were distinguished. They were presented in the form of a block diagram. Most events initiating the claims were reported in the following group - adverse actions of third parties, while the fewest were recorded in the group - the lack of access to the construction site. Based on calculated similarity indicators it was found that considered construction sites were diversified in terms of the number of the events occurrence that generated the claim and their sources. In recent years, many road projects are completed behind the schedule and their initially planned budgets are significantly exceeded. Conducted research indicated that data derived from the analysis of documents connected with claims can be applied to identify and classify both cost and schedule risk factors. Obtained data can also be useful at the stage of risk control because early diagnosis of threats in relation to technical and organizational aspects is necessary to take effective action.
NASA Astrophysics Data System (ADS)
Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.
2016-08-01
In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.
Critical Path Method Networks and Their Use in Claims Analysis.
1984-01-01
produced will only be as good as the time invested and the knowledge of the scheduler. A schedule which is based on faulty logic or which contains... fundementals of putting a schedule together but also *how the construction process functions so that the delays can be accurately inserted. When
1990-10-01
to economic, technological, spatial or logistic concerns, or involve training, man-machine interfaces, or integration into existing systems. Once the...probabilistic reasoning, mixed analysis- and simulation-oriented, mixed computation- and communication-oriented, nonpreemptive static priority...scheduling base, nonrandomized, preemptive static priority scheduling base, randomized, simulation-oriented, and static scheduling base. The selection of both
Effects of Activity Schedules on Challenging Behavior for Children with Autism
ERIC Educational Resources Information Center
Scalzo, Rachel; Davis, Tonya N.; Weston, Regan; Dukes, Elizabeth; Leeper, Dana; Min, Nandar; Mom, Allen; Stone, Jessica; Weber, Alex
2017-01-01
This study examined activity schedules as an intervention to decrease challenging behavior and increase academic engagement during work tasks scheduled after free play activities in three boys diagnosed with autism spectrum disorder (ASD). Functional analysis results indicated all participants' challenging behavior was maintained, at least in…
An Analysis of Instruction-Cached SIMD Computer Architecture
1993-12-01
ASSEBLE SIMULATE SCHEDULE VERIFY :t og ... . .. ... V~JSRUCTONSFOR PECIIEDCOMPARE ASSEMBLEI SIMULATE Ift*U1II ~ ~ SCHEDULEIinw ;. & VERIFY...Cache to Place Blocks ................. 70 4.5.4 Step 4: Schedule Cache Blocks ............................. 70 4.5.5 Step 5: Store Cache Blocks...167 B.4 Scheduler .............................................. 167 B.4.1 Basic Block Definition
NASA Technical Reports Server (NTRS)
Ghaffarian, Reza; Evans, John W.
2014-01-01
For five decades, the semiconductor industry has distinguished itself by the rapid pace of improvement in miniaturization of electronics products-Moore's Law. Now, scaling hits a brick wall, a paradigm shift. The industry roadmaps recognized the scaling limitation and project that packaging technologies will meet further miniaturization needs or ak.a "More than Moore". This paper presents packaging technology trends and accelerated reliability testing methods currently being practiced. Then, it presents industry status on key advanced electronic packages, factors affecting accelerated solder joint reliability of area array packages, and IPC/JEDEC/Mil specifications for characterizations of assemblies under accelerated thermal and mechanical loading. Finally, it presents an examples demonstrating how Accelerated Testing and Analysis have been effectively employed in the development of complex spacecraft thereby reducing risk. Quantitative assessments necessarily involve the mathematics of probability and statistics. In addition, accelerated tests need to be designed which consider the desired risk posture and schedule for particular project. Such assessments relieve risks without imposing additional costs. and constraints that are not value added for a particular mission. Furthermore, in the course of development of complex systems, variances and defects will inevitably present themselves and require a decision concerning their disposition, necessitating quantitative assessments. In summary, this paper presents a comprehensive view point, from technology to systems, including the benefits and impact of accelerated testing in offsetting risk.
Croteau, Agathe; Marcoux, Sylvie; Brisson, Chantal
2006-01-01
Objectives. We undertook a case–control study to evaluate whether some occupational conditions during pregnancy increase the risk of delivering a small-for-gestational-age (SGA) infant and whether taking measures to eliminate these conditions decreases that risk. Methods. The 1536 cases and 4441 controls were selected from 43898 women who had single live births between January 1997 and March 1999 in Québec, Canada. The women were interviewed by telephone after delivery. Results. The risk of having an SGA infant increased with an irregular or shift-work schedule alone and with a cumulative index of the following occupational conditions: night hours, irregular or shift-work schedule, standing, lifting loads, noise, and high psychological demand combined with low social support. When the conditions were not eliminated, the risk increased with the number of conditions (Ptrend =.004; odds ratios=1.00, 1.08, 1.28, 1.43, and 2.29 for 0, 1, 2, 3, and 4–6 conditions, respectively). Elimination of the conditions before 24 weeks of pregnancy brought the risks close to those of unexposed women. Conclusions. Certain occupational conditions experienced by pregnant women can increase their risk of having an SGA infant, but preventive measures can reduce the risk. PMID:16571706
Lessons Learned from the Clementine Mission
NASA Technical Reports Server (NTRS)
1997-01-01
According to BMDO, the Clementine mission achieved many of its technology objectives during its flight to the Moon in early 1994 but, because of a software error, was unable to test the autonomous tracking of a cold target. The preliminary analyses of the returned lunar data suggest that valuable scientific measurements were made on several important topics but that COMPLEX's highest-priority objectives for lunar science were not achieved. This is not surprising given that the rationale for Clementine was technological rather than scientific. COMPLEX lists below a few of the lessons that may be learned from Clementine. Although the Clementine mission was not conceived as a NASA science mission exactly like those planned for the Discovery program, many operational aspects of the two are similar. It is therefore worthwhile to understand the strengths and faults of the Clementine approach. Some elements of the Clementine operation that led to the mission's success include the following: (1) The mission's achievements were the responsibility of a single organization and its manager, which made that organization and that individual accountable for the final outcome; (2) The sponsor adopted a hands-off approach and set a minimum number of reviews (three); (3) The sponsor accepted a reasonable amount of risk and allowed the project team to make the trade-offs necessary to minimize the mission's risks while still accomplishing all its primary objectives; and (4) The development schedule was brief and the agreed-on funding (and funding profile) was adhered to. Among the operational shortcomings of Clementine were the following: (1) An overly ambitious schedule and a slightly lean budget (meaning insufficient time for software development and testing, and leading ultimately to human exhaustion); and (2) No support for data calibration, reduction, and analysis. The principal lesson to be learned in this category is that any benefits from the constructive application of higher risk for lower cost and faster schedule will be lost if the schedule does not allow adequate time for the development of all essential systems or makes no allowance for human frailties. Another lesson to be drawn is that despite its limitations, if judged strictly as a science mission, Clementine attested that significant scientific information can be gathered during a technology-demonstration mission. In the current era of limited funds, when science missions will be infrequent, the opportunity to fly scientific instruments aboard missions whose objectives might be other than science must be seized and, indeed, encouraged. During such opportunities it would be inexcusable to do second-class science. Thus the scientific community must be actively involved in such projects from their initiation.
Shift work and the assessment and management of shift work disorder (SWD).
Wright, Kenneth P; Bogan, Richard K; Wyatt, James K
2013-02-01
Nearly 20% of the labor force worldwide, work shifts that include work hours outside 07:00 h to 18:00 h. Shift work is common in many occupations that directly affect the health and safety of others (e.g., protective services, transportation, healthcare), whereas quality of life, health, and safety during shift work and the commute home can affect workers in any field. Increasing evidence indicates that shift-work schedules negatively influence worker physiology, health, and safety. Shift work disrupts circadian sleep and alerting cycles, resulting in disturbed daytime sleep and excessive sleepiness during the work shift. Moreover, shift workers are at risk for shift work disorder (SWD). This review focuses on shift work and the assessment and management of sleepiness and sleep disruption associated with shift work schedules and SWD. Management strategies include approaches to promote sleep, wakefulness, and adaptation of the circadian clock to the imposed work schedule. Additional studies are needed to further our understanding of the mechanisms underlying the health risks of shift work, understanding which shift workers are at most risk of SWD, to investigate treatment options that address the health and safety burdens associated with shift work and SWD, and to further develop and assess the comparative effectiveness of countermeasures and treatment options. Copyright © 2012 Elsevier Ltd. All rights reserved.
Simulated annealing with probabilistic analysis for solving traveling salesman problems
NASA Astrophysics Data System (ADS)
Hong, Pei-Yee; Lim, Yai-Fung; Ramli, Razamin; Khalid, Ruzelan
2013-09-01
Simulated Annealing (SA) is a widely used meta-heuristic that was inspired from the annealing process of recrystallization of metals. Therefore, the efficiency of SA is highly affected by the annealing schedule. As a result, in this paper, we presented an empirical work to provide a comparable annealing schedule to solve symmetric traveling salesman problems (TSP). Randomized complete block design is also used in this study. The results show that different parameters do affect the efficiency of SA and thus, we propose the best found annealing schedule based on the Post Hoc test. SA was tested on seven selected benchmarked problems of symmetric TSP with the proposed annealing schedule. The performance of SA was evaluated empirically alongside with benchmark solutions and simple analysis to validate the quality of solutions. Computational results show that the proposed annealing schedule provides a good quality of solution.
Prevalence and correlates of poor sleep quality and daytime sleepiness in Belgian truck drivers.
Braeckman, Lutgart; Verpraet, Rini; Van Risseghem, Marleen; Pevernagie, Dirk; De Bacquer, Dirk
2011-03-01
Sleepiness and sleep complaints are common among professional drivers. Sleepiness is a considerable problem not only because it affects the drivers' well-being, but also because of the consequences for performance and safety. Assessment of the (self-reported) prevalence and research into the risk factors are thus an important health issue and are also indispensable to prevent productivity loss and work-related accidents and injuries. Therefore, the aim of this study was to describe sleeping, driving, and health characteristics of Belgian truck drivers and to determine occupational and individual factors associated with poor sleep quality and daytime sleepiness. Cross-sectional data were collected using a self-administered questionnaire that included the Pittsburgh Sleep Quality Index (PSQI), Epworth Sleepiness Scale (ESS), and Berlin Questionnaire (BQ). The mean (SD) age of the 476 studied truck drivers was 42.7 (10.2) yrs and the mean (SD) body mass index was 27.3 (5.1) kg/m(2). Approximately 47% declared that they drove >50 h/wk and found their work schedule unrealistic. The mean (SD) PSQI score was 4.45 (2.7); poor quality of sleep (PSQI >5) was found in 27.2%. The mean (SD) ESS score was 6.79 (4.17); 18% had a score >10. The BQ indicated that 21.5% had a higher risk on obstructive sleep apnea. In multiple logistic regression analysis, low educational level (odds ratio [OR] 1.86), current smoking (OR 1.75), unrealistic work schedule (OR 1.75), and risk for obstructive sleep apnea (OR 2.97) were found to be independent correlates of daytime sleepiness. Poor sleep quality was significantly associated with poor self-perceived health (OR 1.95), unrealistic work schedule (OR 2.85), low job satisfaction (OR 1.91), and less driving experience (OR 1.73). These results show that poor sleep quality and daytime sleepiness were prevalent in Belgian truck drivers. Taking into account that several significant correlates with respect to these sleep problems were identified both at the individual and the occupational level, comprehensive countermeasures to improve working conditions and organization are needed, as well as health promotion interventions, to ensure the safety and well-being of truck drivers.
The effectiveness of risk management program on pediatric nurses' medication error.
Dehghan-Nayeri, Nahid; Bayat, Fariba; Salehi, Tahmineh; Faghihzadeh, Soghrat
2013-09-01
Medication therapy is one of the most complex and high-risk clinical processes that nurses deal with. Medication error is the most common type of error that brings about damage and death to patients, especially pediatric ones. However, these errors are preventable. Identifying and preventing undesirable events leading to medication errors are the main risk management activities. The aim of this study was to investigate the effectiveness of a risk management program on the pediatric nurses' medication error rate. This study is a quasi-experimental one with a comparison group. In this study, 200 nurses were recruited from two main pediatric hospitals in Tehran. In the experimental hospital, we applied the risk management program for a period of 6 months. Nurses of the control hospital did the hospital routine schedule. A pre- and post-test was performed to measure the frequency of the medication error events. SPSS software, t-test, and regression analysis were used for data analysis. After the intervention, the medication error rate of nurses at the experimental hospital was significantly lower (P < 0.001) and the error-reporting rate was higher (P < 0.007) compared to before the intervention and also in comparison to the nurses of the control hospital. Based on the results of this study and taking into account the high-risk nature of the medical environment, applying the quality-control programs such as risk management can effectively prevent the occurrence of the hospital undesirable events. Nursing mangers can reduce the medication error rate by applying risk management programs. However, this program cannot succeed without nurses' cooperation.
group depend on the project phase and the maturity of the NLC design. Currently the NLC project is in design approaches that will enable cost estimates, schedules, risk assessment and risk reduction availability are utilized in generating and selecting among design alternatives. A more comprehensive version
A Network Flow Approach to the Initial Skills Training Scheduling Problem
2007-12-01
include (but are not limited to) queuing theory, stochastic analysis and simulation. After the demand schedule has been estimated, it can be ...software package has already been purchased and is in use by AFPC, AFPC has requested that the new algorithm be programmed in this language as well ...the discussed outputs from those schedules. Required Inputs A single input file details the students to be scheduled as well as the courses
Stability of Early Risk Assessment for Autism Spectrum Disorder in Preterm Infants
ERIC Educational Resources Information Center
Yaari, Maya; Yitzhak, Neta; Harel, Ayelet; Friedlander, Edwa; Bar-Oz, Benjamin; Eventov-Friedman, Smadar; Mankuta, David; Gamliel, Ifat; Yirmiya, Nurit
2016-01-01
Stability and change in early autism spectrum disorder risk were examined in a cohort of 99 preterm infants (?34 weeks of gestation) using the Autism Observation Scale for Infants at 8 and 12 months and the Autism Diagnostic Observation Schedule--Toddler Module at 18 months. A total of 21 infants were identified at risk by the Autism Observation…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... Adopt Fees for the New PSX Pre-Trade Risk Management Service August 19, 2011. Pursuant to Section 19(b... The Exchange proposes to establish and adopt fees for the new PSX Pre-Trade Risk Management Service... Exchange is proposing to amend Chapter VIII of its fee schedule to adopt PSX Pre-trade Risk Management and...
Truck driver fatigue risk assessment and management: a multinational survey.
Adams-Guppy, Julie; Guppy, Andrew
2003-06-20
As part of an organizational review of safety, interviews and questionnaire surveys were performed on over 700 commercial goods drivers and their managers within a series of related companies operating across 17 countries. The results examine the reported incidence of fatigue-related problems in drivers and their associations with near miss and accident experience as well as work and organizational factors. Experience of fatigue problems while driving was linked to time of day and rotation of shifts, though most associations were small. There were significant associations found between fatigue experiences and driver and management systems of break taking and route scheduling. The quantitative combined with qualitative information suggested that, where feasible, more flexible approaches to managing the scheduling and sequencing of deliveries assisted drivers in managing their own fatigue problems through appropriate break-taking. The results are interpreted within the overarching principles of risk assessment and risk control.
Van Laar, Margriet; Van Der Pol, Peggy; Niesink, Raymond
2016-08-01
The Netherlands has seen an increase in Δ9-tetrahydrocannabinol (THC) concentrations from approximately 8% in the 1990s up to 20% in 2004. Increased cannabis potency may lead to higher THC-exposure and cannabis related harm. The Dutch government officially condones the sale of cannabis from so called 'coffee shops', and the Opium Act distinguishes cannabis as a Schedule II drug with 'acceptable risk' from other drugs with 'unacceptable risk' (Schedule I). Even in 1976, however, cannabis potency was taken into account by distinguishing hemp oil as a Schedule I drug. In 2011, an advisory committee recommended tightening up legislation, leading to a 2013 bill proposing the reclassification of high potency cannabis products with a THC content of 15% or more as a Schedule I drug. The purpose of this measure was twofold: to reduce public health risks and to reduce illegal cultivation and export of cannabis by increasing punishment. This paper focuses on the public health aspects and describes the (explicit and implicit) assumptions underlying this '15% THC measure', as well as to what extent these are supported by scientific research. Based on scientific literature and other sources of information, we conclude that the 15% measure can provide in theory a slight health benefit for specific groups of cannabis users (i.e., frequent users preferring strong cannabis, purchasing from coffee shops, using 'steady quantities' and not changing their smoking behaviour), but certainly not for all cannabis users. These gains should be weighed against the investment in enforcement and the risk of unintended (adverse) effects. Given the many assumptions and uncertainty about the nature and extent of the expected buying and smoking behaviour changes, the measure is a political choice and based on thin evidence. Copyright © 2016 Springer. Published by Elsevier B.V. All rights reserved.
Root Source Analysis/ValuStream[Trade Mark] - A Methodology for Identifying and Managing Risks
NASA Technical Reports Server (NTRS)
Brown, Richard Lee
2008-01-01
Root Source Analysis (RoSA) is a systems engineering methodology that has been developed at NASA over the past five years. It is designed to reduce costs, schedule, and technical risks by systematically examining critical assumptions and the state of the knowledge needed to bring to fruition the products that satisfy mission-driven requirements, as defined for each element of the Work (or Product) Breakdown Structure (WBS or PBS). This methodology is sometimes referred to as the ValuStream method, as inherent in the process is the linking and prioritizing of uncertainties arising from knowledge shortfalls directly to the customer's mission driven requirements. RoSA and ValuStream are synonymous terms. RoSA is not simply an alternate or improved method for identifying risks. It represents a paradigm shift. The emphasis is placed on identifying very specific knowledge shortfalls and assumptions that are the root sources of the risk (the why), rather than on assessing the WBS product(s) themselves (the what). In so doing RoSA looks forward to anticipate, identify, and prioritize knowledge shortfalls and assumptions that are likely to create significant uncertainties/ risks (as compared to Root Cause Analysis, which is most often used to look back to discover what was not known, or was assumed, that caused the failure). Experience indicates that RoSA, with its primary focus on assumptions and the state of the underlying knowledge needed to define, design, build, verify, and operate the products, can identify critical risks that historically have been missed by the usual approaches (i.e., design review process and classical risk identification methods). Further, the methodology answers four critical questions for decision makers and risk managers: 1. What s been included? 2. What's been left out? 3. How has it been validated? 4. Has the real source of the uncertainty/ risk been identified, i.e., is the perceived problem the real problem? Users of the RoSA methodology have characterized it as a true bottoms up risk assessment.
Updated hazard rate equations for dual safeguard systems.
Rothschild, Marc
2007-04-11
A previous paper by this author [M.J. Rothschild, Updated hazard rate equation for single safeguards, J. Hazard. Mater. 130 (1-2) (2006) 15-20] showed that commonly used analytical methods for quantifying failure rates overestimates the risk in some circumstances. This can lead the analyst to mistakenly believe that a given operation presents an unacceptable risk. For a single safeguard system, a formula was presented in that paper that accurately evaluates the risk over a wide range of conditions. This paper expands on that analysis by evaluating the failure rate for dual safeguard systems. The safeguards can be activated at the same time or at staggered times, and the safeguard may provide an indication whether it was successful upon a challenge, or its status may go undetected. These combinations were evaluated using a Monte Carlo simulation. Empirical formulas for evaluating the hazard rate were developed from this analysis. It is shown that having the safeguards activate at the same time while providing positive feedback of their individual actions is the most effective arrangement in reducing the hazard rate. The hazard rate can also be reduced by staggering the testing schedules of the safeguards.
NASA Technical Reports Server (NTRS)
Carter, John; Kelly, John; Jones, Dan; Lee, James
2013-01-01
There is a national effort to expedite advanced space technologies on new space systems for both government and commercial applications. In order to lower risk, these technologies should be demonstrated in a relevant environment before being installed in new space systems. This presentation introduces several low cost, short schedule space technology demonstrations using airborne and range facilities available at the Dryden Flight Research Center.
Shoda, Megan E.; Nowell, Lisa H.; Stone, Wesley W.; Sandstrom, Mark W.; Bexfield, Laura M.
2018-04-02
In 2013, the U.S. Geological Survey National Water Quality Laboratory (NWQL) made a new method available for the analysis of pesticides in filtered water samples: laboratory schedule 2437. Schedule 2437 is an improvement on previous analytical methods because it determines the concentrations of 225 fungicides, herbicides, insecticides, and associated degradates in one method at similar or lower concentrations than previously available methods. Additionally, the pesticides included in schedule 2437 were strategically identified in a prioritization analysis that assessed likelihood of occurrence, prevalence of use, and potential toxicity. When the NWQL reports pesticide concentrations for analytes in schedule 2437, the laboratory also provides supplemental information useful to data users for assessing method performance and understanding data quality. That supplemental information is discussed in this report, along with an initial analysis of analytical recovery of pesticides in water-quality samples analyzed by schedule 2437 during 2013–2015. A total of 523 field matrix spike samples and their paired environmental samples and 277 laboratory reagent spike samples were analyzed for this report (1,323 samples total). These samples were collected in the field as part of the U.S. Geological Survey National Water-Quality Assessment groundwater and surface-water studies and as part of the NWQL quality-control program. This report reviews how pesticide samples are processed by the NWQL, addresses how to obtain all the data necessary to interpret pesticide concentrations, explains the circumstances that result in a reporting level change or the occurrence of a raised reporting level, and describes the calculation and assessment of recovery. This report also discusses reasons why a data user might choose to exclude data in an interpretive analysis and outlines the approach used to identify the potential for decreased data quality in the assessment of method recovery. The information provided in this report is essential to understanding pesticide data determined by schedule 2437 and should be reviewed before interpretation of these data.
NASA Astrophysics Data System (ADS)
Arons-Polan, Bonnie
This study examined the effect of three schedule types on student achievement in Advanced Placement Biology classes. AP Biology test scores from students on three types of full-year schedules were analyzed to assess the impact schedule type had on student achievement. The three schedules included the block and traditional schedules, and the rotating/hybrid, a blend of the former two schedules. The results indicated the variable most closely associated with success on the AP Biology exam was the length of experience the teachers had teaching the course, regardless of schedule type. Although significant differences were seen in mean AP Biology test scores among the three schedule types, this could be explained by the relationship between instructors' experience and schedule type. Regression analysis determined the two strongest predictors of successful performance on the AP Biology exam were instructors' experience and perceived teaching style, regardless of schedule type. It appears that the economically developed suburbs, had teachers with the largest amount of experience teaching AP Biology, and these teachers reported using a direct approach to teaching, using lecture greater than 50% of the time. The results of this study also suggest when restructuring to improve student achievement, educators should examine other variables in addition to the high school schedule. Restructuring the day to allow for longer classes must be accompanied by professional staff development to allow teachers to develop new teaching methods. Most of the teachers in the survey reported using lecture a great deal of the time, regardless of schedule type. Comments from the teachers from the various schedules revealed that the ability to add student centered, inquiry based activities and labs were dependent on adequate class time. No information on whether or not the teachers were given professional development to expand their repertoire of teaching methods when the school adopted a block or rotating hybrid schedule was obtained. Limitations to this study include the fact that there was no independent verification of teaching style as reported by the teachers in this study. This study involved only Advanced Placement Biology classes, so no generalizations can be made to other science classes.
PICASSO: an end-to-end image simulation tool for space and airborne imaging systems
NASA Astrophysics Data System (ADS)
Cota, Steve A.; Bell, Jabin T.; Boucher, Richard H.; Dutton, Tracy E.; Florio, Chris J.; Franz, Geoffrey A.; Grycewicz, Thomas J.; Kalman, Linda S.; Keller, Robert A.; Lomheim, Terrence S.; Paulson, Diane B.; Willkinson, Timothy S.
2008-08-01
The design of any modern imaging system is the end result of many trade studies, each seeking to optimize image quality within real world constraints such as cost, schedule and overall risk. Image chain analysis - the prediction of image quality from fundamental design parameters - is an important part of this design process. At The Aerospace Corporation we have been using a variety of image chain analysis tools for many years, the Parameterized Image Chain Analysis & Simulation SOftware (PICASSO) among them. In this paper we describe our PICASSO tool, showing how, starting with a high quality input image and hypothetical design descriptions representative of the current state of the art in commercial imaging satellites, PICASSO can generate standard metrics of image quality in support of the decision processes of designers and program managers alike.
PICASSO: an end-to-end image simulation tool for space and airborne imaging systems
NASA Astrophysics Data System (ADS)
Cota, Stephen A.; Bell, Jabin T.; Boucher, Richard H.; Dutton, Tracy E.; Florio, Christopher J.; Franz, Geoffrey A.; Grycewicz, Thomas J.; Kalman, Linda S.; Keller, Robert A.; Lomheim, Terrence S.; Paulson, Diane B.; Wilkinson, Timothy S.
2010-06-01
The design of any modern imaging system is the end result of many trade studies, each seeking to optimize image quality within real world constraints such as cost, schedule and overall risk. Image chain analysis - the prediction of image quality from fundamental design parameters - is an important part of this design process. At The Aerospace Corporation we have been using a variety of image chain analysis tools for many years, the Parameterized Image Chain Analysis & Simulation SOftware (PICASSO) among them. In this paper we describe our PICASSO tool, showing how, starting with a high quality input image and hypothetical design descriptions representative of the current state of the art in commercial imaging satellites, PICASSO can generate standard metrics of image quality in support of the decision processes of designers and program managers alike.
Schetelig, J; Schaich, M; Schäfer-Eckart, K; Hänel, M; Aulitzky, W E; Einsele, H; Schmitz, N; Rösler, W; Stelljes, M; Baldus, C D; Ho, A D; Neubauer, A; Serve, H; Mayer, J; Berdel, W E; Mohr, B; Oelschlägel, U; Parmentier, S; Röllig, C; Kramer, M; Platzbecker, U; Illmer, T; Thiede, C; Bornhäuser, M; Ehninger, G
2015-05-01
The optimal timing of allogeneic hematopoietic stem cell transplantation (HCT) in acute myeloid leukemia (AML) is controversial. We report on 1179 patients with a median age of 48 years who were randomized upfront. In the control arm, sibling HCT was scheduled in the first complete remission for intermediate-risk or high-risk AML and matched unrelated HCT in complex karyotype AML. In the experimental arm, matched unrelated HCT in first remission was offered also to patients with an FLT3-ITD (FMS-like tyrosine kinase 3-internal tandem duplication) allelic ratio >0.8, poor day +15 marrow blast clearance and adverse karyotypes. Further, allogeneic HCT was recommended in high-risk AML to be performed in aplasia after induction chemotherapy. In the intent-to-treat (ITT) analysis, superiority of the experimental transplant strategy could not be shown with respect to overall survival (OS) or event-free survival. As-treated analyses suggest a profound effect of allogeneic HCT on OS (HR 0.73; P=0.002) and event-free survival (HR 0.67; P<0.001). In high-risk patients, OS was significantly improved after allogeneic HCT in aplasia (HR 0.64; P=0.046) and after HCT in remission (HR 0.74; P=0.03). Although superiority of one study arm could not be demonstrated in the ITT analysis, secondary analyses suggest that early allogeneic HCT is a promising strategy for patients with high-risk AML.
Bias of phencyclidine discrimination by the schedule of reinforcement.
McMillan, D E; Wenger, G R
1984-01-01
Pigeons, trained to discriminate phencyclidine from saline under a procedure requiring the bird to track the location of a color, received cumulative doses of phencyclidine, pentobarbital, or d-amphetamine with a variety of schedules of reinforcement in effect (across phases). When the same second-order schedules were used to reinforce responding after either saline or phencyclidine administration, stimulus control by phencyclidine did not depend on the schedule parameter. When different second-order schedules were used that biased responding toward the phencyclidine-correlated key color, pigeons responded on the phencyclidine-correlated key at lower doses of phencyclidine and pentobarbital than when the second-order schedule biased responding toward the saline key color. A similar but less marked effect was obtained with d-amphetamine. Attempts to produce bias by changing reinforcement magnitude (duration of food availability) were less successful. A signal-detection analysis of dose-effect curves for phencyclidine under two of the second-order schedules employed suggested that at low doses of phencyclidine, response bias is a major determinant of responding. As doses were increased, position preferences occurred and response bias decreased; at higher doses both response bias and position preference decreased and discriminability increased. With low doses of pentobarbital, responding again was biased but increasing doses produced position preference with only small increases in discriminability. At low doses of d-amphetamine responding also was biased, but bias did not decrease consistently with dose nor did discriminability increase. These experiments suggest that the schedule of reinforcement can be used to bias responding toward or away from making the drug-correlated response in drug discrimination experiments, and that signal-detection analysis and analysis of responding at a position can be used to separate the discriminability of the drug state from other effects of the drug on responding. PMID:6481300
Martin-Gill, Christian; Barger, Laura K; Moore, Charity G; Higgins, J Stephen; Teasley, Ellen M; Weiss, Patricia M; Condle, Joseph P; Flickinger, Katharyn L; Coppler, Patrick J; Sequeira, Denisse J; Divecha, Ayushi A; Matthews, Margaret E; Lang, Eddy S; Patterson, P Daniel
2018-02-15
Scheduled napping during work shifts may be an effective way to mitigate fatigue-related risk. This study aimed to critically review and synthesize existing literature on the impact of scheduled naps on fatigue-related outcomes for EMS personnel and similar shift worker groups. A systematic literature review was performed of the impact of a scheduled nap during shift work on EMS personnel or similar shift workers. The primary (critical) outcome of interest was EMS personnel safety. Secondary (important) outcomes were patient safety; personnel performance; acute states of fatigue, alertness, and sleepiness; indicators of sleep duration and/or quality; employee retention/turnover; indicators of long-term health; and cost to the system. Meta-analyses were performed to evaluate the impact of napping on a measure of personnel performance (the psychomotor vigilance test [PVT]) and measures of acute fatigue. Of 4,660 unique records identified, 13 experimental studies were determined relevant and summarized. The effect of napping on reaction time measured at the end of shift was small and non-significant (SMD 0.12, 95% CI -0.13 to 0.36; p = 0.34). Napping during work did not change reaction time from the beginning to the end of the shift (SMD -0.01, 95% CI -25.0 to 0.24; p = 0.96). Naps had a moderate, significant effect on sleepiness measured at the end of shift (SMD 0.40, 95% CI 0.09 to 0.72; p = 0.01). The difference in sleepiness from the start to the end of shift was moderate and statistically significant (SMD 0.41, 95% CI 0.09 to 0.72; p = 0.01). Reviewed literature indicated that scheduled naps at work improved performance and decreased fatigue in shift workers. Further research is required to identify the optimal timing and duration of scheduled naps to maximize the beneficial outcomes.
Filling the Holes: Work Schedulers as Job Crafters of Employment Practice in Long-Term Health Care
Kossek, Ellen Ernst; Piszczek, Matthew M.; Mcalpine, Kristie L.; Hammer, Leslie B.; Burke, Lisa
2016-01-01
Although work schedulers serve an organizational role influencing decisions about balancing conflicting stakeholder interests over schedules and staffing, scheduling has primarily been described as an objective activity or individual job characteristic. The authors use the lens of job crafting to examine how schedulers in 26 health care facilities enact their roles as they “fill holes” to schedule workers. Qualitative analysis of interview data suggests that schedulers expand their formal scope and influence to meet their interpretations of how to manage stakeholders (employers, workers, and patients). The authors analyze variations in the extent of job crafting (cognitive, physical, relational) to broaden role repertoires. They find evidence that some schedulers engage in rule-bound interpretation to avoid role expansion. They also identify four types of schedulers: enforcers, patient-focused schedulers, employee-focused schedulers, and balancers. The article adds to the job-crafting literature by showing that job crafting is conducted not only to create meaningful work but also to manage conflicting demands and to mediate among the competing labor interests of workers, clients, and employers. PMID:27721517
[Analysis of the rationality of the water schedule in student-athletes of various specializations].
Davletova, N Kh; Ivanov, A V; Tafeeva, E A
The presented in the article the analysis of water schedule in student-athletes showed a low level of water consumption culture and the irrationality of the actual water schedule. According to the results of the survey revealed that 86.7% of boys-athletes and 67.2% of girls athletes were revealed to fail to keep a certain water schedule; 98.3% student-athletes are in a state of dehydration of the body. There are established correlations between the presence of dehydration of the body and symptoms such as fatigue and decreased performance (correlation coefficient 0.594, p = 0.01), the appearance of dryness in the morning on an empty stomach (correlation coefficient 0.512, p = 0.01).
ERIC Educational Resources Information Center
Wakefield, James A., Jr.; Cunningham, Claude H.
1975-01-01
The Vocational Preference Inventory and the Edwards Personal Preference Schedule were administered to 372 undergraduates. The two instruments were compared using canonical analysis. The analysis revealed three significant relationships between components of the two instruments. The relationships were viewed as supportive of Holland's theory of…
Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.
ERIC Educational Resources Information Center
Gonzalez, Castor
This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…
Space station systems analysis study. Part 3: Documentation. Volume 5: Cost and schedule data
NASA Technical Reports Server (NTRS)
1977-01-01
Cost estimates for the space station systems analysis were recorded. Space construction base costs and characteristics were cited as well as mission hardware costs and characteristics. Also delineated were cost ground rules, the program schedule, and a detail cost estimate and funding distribution.
A Principal Components Analysis of the Rathus Assertiveness Schedule.
ERIC Educational Resources Information Center
Law, H. G.; And Others
1979-01-01
Investigated the adequacy of the Rathus Assertiveness Schedule (RAS) as a global measure of assertiveness. Analysis indicated that the RAS does not provide a unidimensional index of assertiveness, but rather measures a number of factors including situation-specific assertive behavior, aggressiveness, and a more general assertiveness. (Author)
User’s guide to SNAP for ArcGIS® :ArcGIS interface for scheduling and network analysis program
Woodam Chung; Dennis Dykstra; Fred Bower; Stephen O’Brien; Richard Abt; John. and Sessions
2012-01-01
This document introduces a computer software named SNAP for ArcGIS® , which has been developed to streamline scheduling and transportation planning for timber harvest areas. Using modern optimization techniques, it can be used to spatially schedule timber harvest with consideration of harvesting costs, multiple products, alternative...
ERIC Educational Resources Information Center
Brackney, Ryan J.; Cheung, Timothy H. C.; Neisewander, Janet L.; Sanabria, Federico
2011-01-01
Dissociating motoric and motivational effects of pharmacological manipulations on operant behavior is a substantial challenge. To address this problem, we applied a response-bout analysis to data from rats trained to lever press for sucrose on variable-interval (VI) schedules of reinforcement. Motoric, motivational, and schedule factors (effort…
State Teacher Salary Schedules. Policy Analysis
ERIC Educational Resources Information Center
Griffith, Michael
2016-01-01
In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…
NASA Technical Reports Server (NTRS)
1979-01-01
Cost scheduling and funding data are presented for the reference design of the power extension package. Major schedule milestones are correlated with current Spacelab flight dates. Funding distributions provide for minimum expenditure during the first year of the project.
A New Lagrangian Relaxation Method Considering Previous Hour Scheduling for Unit Commitment Problem
NASA Astrophysics Data System (ADS)
Khorasani, H.; Rashidinejad, M.; Purakbari-Kasmaie, M.; Abdollahi, A.
2009-08-01
Generation scheduling is a crucial challenge in power systems especially under new environment of liberalization of electricity industry. A new Lagrangian relaxation method for unit commitment (UC) has been presented for solving generation scheduling problem. This paper focuses on the economical aspect of UC problem, while the previous hour scheduling as a very important issue is studied. In this paper generation scheduling of present hour has been conducted by considering the previous hour scheduling. The impacts of hot/cold start-up cost have been taken in to account in this paper. Case studies and numerical analysis presents significant outcomes while it demonstrates the effectiveness of the proposed method.
NASA Technical Reports Server (NTRS)
Richards, Stephen F.
1991-01-01
Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.
Predicting Scheduling and Attending for an Oral Cancer Examination
Shepperd, James A.; Emanuel, Amber S.; Howell, Jennifer L.; Logan, Henrietta L.
2015-01-01
Background Oral and pharyngeal cancer is highly treatable if diagnosed early, yet late diagnosis is commonplace apparently because of delays in undergoing an oral cancer examination. Purpose We explored predictors of scheduling and attending an oral cancer examination among a sample of Black and White men who were at high risk for oral cancer because they smoked. Methods During an in-person interview, participants (N = 315) from rural Florida learned about oral and pharyngeal cancer, completed survey measures, and were offered a free examination in the next week. Later, participants received a follow-up phone call to explore why they did or did not attend their examination. Results Consistent with the notion that scheduling and attending an oral cancer exam represent distinct decisions, we found that the two outcomes had different predictors. Defensive avoidance and exam efficacy predicted scheduling an examination; exam efficacy and having coping resources, time, and transportation predicted attending the examination. Open-ended responses revealed that the dominant reasons participants offered for missing a scheduled examination was conflicting obligations, forgetting, and confusion or misunderstanding about the examination. Conclusions The results suggest interventions to increase scheduling and attending an oral cancer examination. PMID:26152644
Risk Management for Human Support Technology Development
NASA Technical Reports Server (NTRS)
jones, Harry
2005-01-01
NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2011 CFR
2011-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
12 CFR 217.36 - Guarantees and credit derivatives: substitution treatment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... treatment. 217.36 Section 217.36 Banks and Banking FEDERAL RESERVE SYSTEM BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM CAPITAL ADEQUACY OF BOARD-REGULATED INSTITUTIONS Risk-Weighted Assets-Standardized Approach... is scheduled to fulfil its obligation on the hedged exposure. If a credit risk mitigant has embedded...
Day, Carolyn A; Shanahan, Marian; Wand, Handan; Topp, Libby; Haber, Paul S; Rodgers, Craig; Deacon, Rachel; Walsh, Nick; Kaldor, John; van Beek, Ingrid; Maher, Lisa
2016-01-01
People who inject drugs (PWID) are at risk of hepatitis B virus (HBV) but have low rates of vaccination completion. The provision of modest financial incentives increases vaccination schedule completion, but their association with serological protection has yet to be determined. To investigate factors associated with vaccine-induced immunity among a sample of PWID randomly allocated to receive AUD$30 cash following receipt of doses two and three ('incentive condition') or standard care ('control condition') using an accelerated 3-dose (0,7,21 days) HBV vaccination schedule. A randomised controlled trial among PWID attending two inner-city health services and a field site in Sydney, Australia, assessing vaccine-induced immunity measured by hepatitis B surface antibodies (HBsAb ≥ 10 mIU/ml) at 12 weeks. The cost of the financial incentives and the provision of the vaccine program are also reported. Just over three-quarters of participants - 107/139 (77%)--completed the vaccination schedule and 79/139 (57%) were HBsAb ≥ 10 mIU/ml at 12 weeks. Vaccine series completion was the only variable significantly associated with vaccine-induced immunity in univariate analysis (62% vs 41%, p<0.035) but was not significant in multivariate analysis. There was no statistically discernible association between group allocation and series completion (62% vs 53%). The mean costs were AUD$150.5, (95% confidence interval [CI]: 142.7-158.3) and AUD$76.9 (95% CI: 72.6-81.3) for the intervention and control groups respectively. Despite increasing HBV vaccination completion, provision of financial incentives was not associated with enhanced serological protection. Further research into factors which affect response rates and the optimal vaccination regimen and incentive schemes for this population are needed. Copyright © 2015 Elsevier B.V. All rights reserved.
1985-11-01
TFW) currently has F-4 aircraft but is scheduled to convert to quieter F-16 aircraft during the early phases of range operation. Even with this...are in the unacceptable range (above 75dBA) according to HUD Standards. If training schedules /purposes allow, we suggest the following: - Flight... schedules should minimize night flights or be scheduled as early as possible. This, however, would not accommodate any affected people that may work at
Ashley, Laura; Armitage, Gerry; Neary, Maria; Hollingsworth, Gillian
2010-08-01
Failure Mode and Effects Analysis (FMEA) is a proactive risk assessment tool used to identify potential vulnerabilities in complex, high-risk processes and to generate remedial actions before the processes result in adverse events. FMEA is increasingly used to proactively assess and improve the safety of complex health care processes such as drug administration and blood transfusion. A central feature of FMEA is that it is undertaken by a multidisciplinary team, and because it entails numerous analytical steps, it takes a series of several meetings. Composing a team of busy health care professionals with the appropriate knowledge, skill mix, and logistical availability for regular meetings is, however, a serious challenge. Despite this, information and advice on FMEA team assembly and meetings scheduling are scarce and diffuse and often presented without the accompanying rationale. Assemble an eight-member team composed of clinically active health care staff, from every profession involved in delivery of the process-and who regularly perform it; staff from a range of seniority levels; outsider(s) to the process-and perhaps even to health care; a leader (and facilitator); and researchers. Plan for 10-15 hours of team meeting time for first-time, narrowly defined FMEAs, scheduled as four to six meetings lasting 2 to 3 hours each, spaced weekly to biweekly. Meet in a venue that seats the team around one table and is off the hospital floor but within its grounds. FMEA, generally acknowledged to be a useful addition to the patient safety toolkit, is a meticulous and time- and resource-intensive methodology, and its successful completion is highly dependent on the team members' aptitude and on the facility's and team members' commitment to hold regular, productive meetings.
APGEN Scheduling: 15 Years of Experience in Planning Automation
NASA Technical Reports Server (NTRS)
Maldague, Pierre F.; Wissler, Steve; Lenda, Matthew; Finnerty, Daniel
2014-01-01
In this paper, we discuss the scheduling capability of APGEN (Activity Plan Generator), a multi-mission planning application that is part of the NASA AMMOS (Advanced Multi- Mission Operations System), and how APGEN scheduling evolved over its applications to specific Space Missions. Our analysis identifies two major reasons for the successful application of APGEN scheduling to real problems: an expressive DSL (Domain-Specific Language) for formulating scheduling algorithms, and a well-defined process for enlisting the help of auxiliary modeling tools in providing high-fidelity, system-level simulations of the combined spacecraft and ground support system.
Developing a Strategic Plan for NASA JSC's Technology Investments
NASA Technical Reports Server (NTRS)
Stecklein, Jonette M.
2012-01-01
Human space exploration has always been heavily influenced by goals to achieve a specific mission on a specific schedule. This approach drove rapid technology development, the rapidity of which adds risks as well as provides a major driver for costs. The National Aeronautics and Space Administration (NASA) is now approaching the extension of human presence throughout the solar system by balancing a proactive yet less schedule-driven development of technology with opportunistic scheduling of missions as the needed technologies are realized. This approach should provide cost effective, low risk technology development that will enable efficient and effective manned spaceflight missions. As a first step, the NASA Human Spaceflight Architecture Team (HAT) has identified a suite of critical technologies needed to support future manned missions across a range of destinations, including in cislunar space, near earth asteroid visits, lunar exploration, Mars space, and Mars exploration. The challenge now is to develop a strategy and plan for technology development that efficiently enables these missions over a reasonable time period, without increasing technology development costs unnecessarily due to schedule pressure, and subsequently mitigating development and mission risks. NASA fs Johnson Space Center (JSC), as the nation's primary center for human exploration, is addressing this challenge through an innovative approach allocating Internal Research and Development funding to projects that have been prioritized using four focus criteria, with appropriate importance weighting. These four focus criteria are the Human Space Flight Technology Needs, JSC Core Technology Competencies, Commercialization Potential, and Partnership Potential. The inherent coupling in these focus criteria have been captured in a database and have provided an initial prioritization for allocation of technology development research funding. This paper will describe this process and this database, and the preliminary technology development prioritization results.
Giberti, C; Gallo, F; Schenone, M; Genova, A
2010-08-01
To present the protocol and the early results of a urothelial carcinoma (UC) screening analysis performed in a risk population of coke workers. Between June 2006 and October 2008, 171 male workers (mean age 43 years), employed in a Ligurian coke plant (Italiana Coke S.r.l) and exposed to polycyclic aromatic hydrocarbons (PAHs) for a median period of 16 years, underwent screening for UC. Urological evaluation included medical history, physical examination, routine laboratory tests, urine analysis, urinary cytology and uCyt+ assay. In the event of signs and symptoms suggestive of UC or positive urinary tests, the workers were also subjected to urinary ultrasonography and cystoscopy with biopsy of any suspicious lesions. Regarding the laboratory tests, 19/171 (11%) uCyt+ samples were considered inadequate and were excluded from the outcomes assessment. Overall, urine analysis, cytology and uCyt+ were positive in 18/152 (12%) subjects who showed no evidence of UC at the scheduled check-ups. No significant association was identified between marker positivity and occupational activity. Our results fail to show an increased risk of UC among the coke workers evaluated. However, they will need to be confirmed in the future by a larger enrollment and a longer follow-up in order to assess the definitive risk for UC after exposure to coke. Copyright © 2010 The Editorial Board of Biomedical and Environmental Sciences. Published by Elsevier B.V. All rights reserved.
mHealth: Using Mobile Technology to Support Healthcare
Okuboyejo, Senanu; Eyesan, Omatseyin
2014-01-01
Adherence to long-term therapy in outpatient setting is required to reduce the prevalence of chronic diseases such as HIV/AIDS, Diabetes, Tuberculosis and Malaria. This paper presents a mobile technology-based medical alert system for outpatient adherence in Nigeria. The system makes use of the SMS and voice features of mobile phones. The system has the potential of improving adherence to medication in outpatient setting by reminding patients of dosing schedules and attendance to scheduled appointments through SMS and voice calls. It will also inform patients of benefits and risks associated with adherence. Interventions aimed at improving adherence would provide significant positive return on investment through primary prevention (of risk factors) and secondary prevention of adverse health outcomes. PMID:24678384
Mass and power modeling of communication satellites
NASA Technical Reports Server (NTRS)
Price, Kent M.; Pidgeon, David; Tsao, Alex
1991-01-01
Analytic estimating relationships for the mass and power requirements for major satellite subsystems are described. The model for each subsystem is keyed to the performance drivers and system requirements that influence their selection and use. Guidelines are also given for choosing among alternative technologies which accounts for other significant variables such as cost, risk, schedule, operations, heritage, and life requirements. These models are intended for application to first order systems analyses, where resources do not warrant detailed development of a communications system scenario. Given this ground rule, the models are simplified to 'smoothed' representation of reality. Therefore, the user is cautioned that cost, schedule, and risk may be significantly impacted where interpolations are sufficiently different from existing hardware as to warrant development of new devices.
Task 2 Report: Algorithm Development and Performance Analysis
1993-07-01
separated peaks ............................................. 39 7-16 Example ILGC data for schedule 3 phosphites showing an analysis method which integrates...more closely follows the baseline ................. 40 7-18 Example R.GC data for schedule 3 phosphites showing an analysis method resulting in unwanted...much of the ambiguity that can arise in GC/MS with trace environmental samples, for example. Correlated chromatography, on the other hand, separates the
Optimal radiotherapy dose schedules under parametric uncertainty
NASA Astrophysics Data System (ADS)
Badri, Hamidreza; Watanabe, Yoichi; Leder, Kevin
2016-01-01
We consider the effects of parameter uncertainty on the optimal radiation schedule in the context of the linear-quadratic model. Our interest arises from the observation that if inter-patient variability in normal and tumor tissue radiosensitivity or sparing factor of the organs-at-risk (OAR) are not accounted for during radiation scheduling, the performance of the therapy may be strongly degraded or the OAR may receive a substantially larger dose than the allowable threshold. This paper proposes a stochastic radiation scheduling concept to incorporate inter-patient variability into the scheduling optimization problem. Our method is based on a probabilistic approach, where the model parameters are given by a set of random variables. Our probabilistic formulation ensures that our constraints are satisfied with a given probability, and that our objective function achieves a desired level with a stated probability. We used a variable transformation to reduce the resulting optimization problem to two dimensions. We showed that the optimal solution lies on the boundary of the feasible region and we implemented a branch and bound algorithm to find the global optimal solution. We demonstrated how the configuration of optimal schedules in the presence of uncertainty compares to optimal schedules in the absence of uncertainty (conventional schedule). We observed that in order to protect against the possibility of the model parameters falling into a region where the conventional schedule is no longer feasible, it is required to avoid extremal solutions, i.e. a single large dose or very large total dose delivered over a long period. Finally, we performed numerical experiments in the setting of head and neck tumors including several normal tissues to reveal the effect of parameter uncertainty on optimal schedules and to evaluate the sensitivity of the solutions to the choice of key model parameters.
Rogers, Michelle L.; Armstrong, Gene F.; Rakowski, William; Bowen, Deborah J.; Hughes, Tonda; McGarry, Kelly A.
2009-01-01
Abstract Objectives We explored self-reported rates of individual on-schedule breast, cervical, and colorectal cancer screenings, as well as an aggregate measure of comprehensive screenings, among unmarried women aged 40–75 years. We compared women who partner with women (WPW) or with women and men (WPWM) to women who partner exclusively with men (WPM). We also compared barriers to on-schedule cancer screenings between WPW/WPWM and WPM. Methods Comparable targeted and respondent-driven sampling methods were used to enroll 213 WPW/WPWM and 417 WPM (n = 630). Logistic regression models were computed to determine if partner gender was associated with each measure of on-schedule screening after controlling for demographic characteristics, health behaviors, and cancer-related experiences. Results Overall, 74.3% of women reported on-schedule breast screening, 78.3% reported on-schedule cervical screening, 66.5% reported on-schedule colorectal screening, and 56.7% reported being on-schedule for comprehensive screening. Partner gender was not associated with any of the measures of on-schedule screening in multivariable analyses. However, women who reported ever putting off, avoiding, or changing the place of screenings because of sexual orientation were less likely to be on-schedule for comprehensive screening. Women who reported barriers associated with taking time from work and body image concerns were also less likely to be on-schedule for comprehensive screening. Conclusions Barriers to cancer screening were comparable across types of examinations as well as between WPW/WPWM and WPM. Developing health promotion programs for unmarried women that address concomitant detection and prevention behaviors may improve the efficiency and effectiveness of healthcare delivery and ultimately assist in reducing multiple disease risks. PMID:19361311
Employment and work schedule are related to telomere length in women
Parks, C G; DeRoo, L A; Miller, D B; McCanlies, E C; Cawthon, R M; Sandler, D P
2011-01-01
Objectives To examine the association of employment and work schedule with shorter DNA telomeres, a marker of cellular ageing and disease risk factor, and consider whether differences were related to health, behaviours and sociodemographic factors, or varied by stress levels or menopausal status. Methods This cross-sectional analysis of 608 women aged 35–74 in the Sister Study examined determinants of relative telomere length (rTL) measured by quantitative PCR in leucocyte DNA. Age-adjusted regression models estimated base pair (bp) rTL differences for current and lifetime schedule characteristics (ie, part-time, full-time or overtime hours; multiple jobs; irregular hours; shiftwork; work at night). Covariates included race, smoking, perceived stress, sleep, physical activity, health and menopausal status, education, marital status, live births, children under 18, measured body mass index and urinary stress hormones. Results Compared with non-employed women with moderate or substantial past work histories (n=190), those currently working full-time (n=247; median 40 h/week) had a shorter rTL, an age-adjusted difference of −329 bp (95% CI −110 to −548). Longer-duration full-time work was also associated with shorter rTL (age-adjusted difference of −472 bp, 95% CI −786 to −158 for 20+ vs 1–5 years). Findings were not explained by health and demographic covariates. However, rTL differences for working at least full-time were greater in women with higher stress and epinephrine levels. Conclusions Current and long-term full-time work were associated with shorter rTL, with differences of similar magnitude to smoking and history of heart disease or diabetes. Longitudinal data with specific stress measures are needed to further evaluate the impact of work schedule on rTL. PMID:21540175
Employment and work schedule are related to telomere length in women.
Parks, C G; DeRoo, L A; Miller, D B; McCanlies, E C; Cawthon, R M; Sandler, D P
2011-08-01
To examine the association of employment and work schedule with shorter DNA telomeres, a marker of cellular ageing and disease risk factor, and consider whether differences were related to health, behaviours and sociodemographic factors, or varied by stress levels or menopausal status. This cross-sectional analysis of 608 women aged 35-74 in the Sister Study examined determinants of relative telomere length (rTL) measured by quantitative PCR in leucocyte DNA. Age-adjusted regression models estimated base pair (bp) rTL differences for current and lifetime schedule characteristics (ie, part-time, full-time or overtime hours; multiple jobs; irregular hours; shiftwork; work at night). Covariates included race, smoking, perceived stress, sleep, physical activity, health and menopausal status, education, marital status, live births, children under 18, measured body mass index and urinary stress hormones. Compared with non-employed women with moderate or substantial past work histories (n=190), those currently working full-time (n=247; median 40 h/week) had a shorter rTL, an age-adjusted difference of -329 bp (95% CI -110 to -548). Longer-duration full-time work was also associated with shorter rTL (age-adjusted difference of -472 bp, 95% CI -786 to -158 for 20+ vs 1-5 years). Findings were not explained by health and demographic covariates. However, rTL differences for working at least full-time were greater in women with higher stress and epinephrine levels. Current and long-term full-time work were associated with shorter rTL, with differences of similar magnitude to smoking and history of heart disease or diabetes. Longitudinal data with specific stress measures are needed to further evaluate the impact of work schedule on rTL.
Dembe, Allard E; Delbos, Rachel; Erickson, J Bianca; Banks, Steven M
2007-12-01
This study examines the effect of long-hour work schedules and nonstandard shift work (e.g., night and evening shifts) on the ability of injured workers to maintain productive employment following a workplace injury. Analyses were based on 13 years of data from the National Longitudinal Survey of Youth. Multivariate logistic regression analyses were performed with one of ten nonstandard schedules as the independent variable and a particular vocational consequences as the dependent variable. Vocational consequences included being unable to perform normal job duties, temporary job reassignment, working less than full time, filing a workers' compensation claim, and quitting or being fired because of the injury. Covariates in the regression model included age, gender, occupation, industry, and region. The most prominent effects of working a nonstandard schedule were a increased risk of being fired (OR = 1.81; 1.15-2.90 CI 95%), quitting (OR = 1.68; 1.20-2.36 CI 95%), or being unable to work full time (OR = 1.33; 1.08-1.64 CI 95%) following an injury, compared to injured workers in conventional schedules. Schedules involving overtime and long working hours generally had a greater impact on vocational consequences following a workplace injury than did schedules involving night, evening, and other nonstandard shift work. Occupational rehabilitation professionals need to consider the specific type of work schedule when developing effective return-to-work plans for injured workers. Special precautions need to be taken for workers returning to schedules that involve more than 12 h per day, 60 h per week, and long commutes.
1984-08-01
recommendations in the report with Martin Marietta over the next few months. Appropriate followup actions will be deter- mined, and any program changes...Technical Feasibility and Validity ...... . . .. 1-6 1.3.2 Program Schedule . . . . . . ......... . .. 1-7 1.3.3 NAS Plan Cost...343.1.1 Overview 3-1 3.1.2 Findings, Risks, and Recommendations . . . . . . . . . 3-3 3.2 Program Schedule . . . . . . . . . . * . . * . *. . 3-6
Projecting Future Scheduled Airline Demand, Schedules and NGATS Benefits Using TSAM
NASA Technical Reports Server (NTRS)
Dollyhigh, Samuel; Smith, Jeremy; Viken, Jeff; Trani, Antonio; Baik, Hojong; Hinze, Nickolas; Ashiabor, Senanu
2006-01-01
The Transportation Systems Analysis Model (TSAM) developed by Virginia Tech s Air Transportation Systems Lab and NASA Langley can provide detailed analysis of the effects on the demand for air travel of a full range of NASA and FAA aviation projects. TSAM has been used to project the passenger demand for very light jet (VLJ) air taxi service, scheduled airline demand growth and future schedules, Next Generation Air Transportation System (NGATS) benefits, and future passenger revenues for the Airport and Airway Trust Fund. TSAM can project the resulting demand when new vehicles and/or technology is inserted into the long distance (100 or more miles one-way) transportation system, as well as, changes in demand as a result of fare yield increases or decreases, airport transit times, scheduled flight times, ticket taxes, reductions or increases in flight delays, and so on. TSAM models all long distance travel in the contiguous U.S. and determines the mode choice of the traveler based on detailed trip costs, travel time, schedule frequency, purpose of the trip (business or non-business), and household income level of the traveler. Demand is modeled at the county level, with an airport choice module providing up to three airports as part of the mode choice. Future enplanements at airports can be projected for different scenarios. A Fratar algorithm and a schedule generator are applied to generate future flight schedules. This paper presents the application of TSAM to modeling future scheduled air passenger demand and resulting airline schedules, the impact of NGATS goals and objectives on passenger demand, along with projections for passenger fee receipts for several scenarios for the FAA Airport and Airway Trust Fund.
Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.
ERIC Educational Resources Information Center
Shore, Marietta Saravia; Nafus, Charles
This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…
Content Analysis Schedule for Bilingual Education Programs: Bilingual Project Forward-Adelante.
ERIC Educational Resources Information Center
Figueroa, Ramon
This content analysis schedule for the Bilingual Project of Rochester, New York presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic background…
Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology
ERIC Educational Resources Information Center
Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot
2004-01-01
The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…
Uncertainty analysis of an irrigation scheduling model for water management in crop production
USDA-ARS?s Scientific Manuscript database
Irrigation scheduling tools are critical to allow producers to manage water resources for crop production in an accurate and timely manner. To be useful, these tools need to be accurate, complete, and relatively reliable. The current work presents the uncertainty analysis and its results for the Mis...
ERIC Educational Resources Information Center
Hess, Richard T.; And Others
This content analysis schedule for the Albuquerque (New Mexico) Public School Bicultural-Bilingual Program presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and…
5 CFR 532.245 - Selection of payline and issuance of wage schedules.
Code of Federal Regulations, 2012 CFR
2012-01-01
... for issuance as the regular wage schedules for the wage area, after considering all of the information, analysis, and recommendations made available to it pursuant to this subpart. (b)(1) The lead agency shall prepare and maintain a record of all of the analysis and deliberations made under this subpart...
5 CFR 532.245 - Selection of payline and issuance of wage schedules.
Code of Federal Regulations, 2011 CFR
2011-01-01
... for issuance as the regular wage schedules for the wage area, after considering all of the information, analysis, and recommendations made available to it pursuant to this subpart. (b)(1) The lead agency shall prepare and maintain a record of all of the analysis and deliberations made under this subpart...
5 CFR 532.245 - Selection of payline and issuance of wage schedules.
Code of Federal Regulations, 2014 CFR
2014-01-01
... for issuance as the regular wage schedules for the wage area, after considering all of the information, analysis, and recommendations made available to it pursuant to this subpart. (b)(1) The lead agency shall prepare and maintain a record of all of the analysis and deliberations made under this subpart...
5 CFR 532.245 - Selection of payline and issuance of wage schedules.
Code of Federal Regulations, 2010 CFR
2010-01-01
... for issuance as the regular wage schedules for the wage area, after considering all of the information, analysis, and recommendations made available to it pursuant to this subpart. (b)(1) The lead agency shall prepare and maintain a record of all of the analysis and deliberations made under this subpart...
5 CFR 532.245 - Selection of payline and issuance of wage schedules.
Code of Federal Regulations, 2013 CFR
2013-01-01
... for issuance as the regular wage schedules for the wage area, after considering all of the information, analysis, and recommendations made available to it pursuant to this subpart. (b)(1) The lead agency shall prepare and maintain a record of all of the analysis and deliberations made under this subpart...
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
NASA Technical Reports Server (NTRS)
Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte
1992-01-01
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.
Dataflow Design Tool: User's Manual
NASA Technical Reports Server (NTRS)
Jones, Robert L., III
1996-01-01
The Dataflow Design Tool is a software tool for selecting a multiprocessor scheduling solution for a class of computational problems. The problems of interest are those that can be described with a dataflow graph and are intended to be executed repetitively on a set of identical processors. Typical applications include signal processing and control law problems. The software tool implements graph-search algorithms and analysis techniques based on the dataflow paradigm. Dataflow analyses provided by the software are introduced and shown to effectively determine performance bounds, scheduling constraints, and resource requirements. The software tool provides performance optimization through the inclusion of artificial precedence constraints among the schedulable tasks. The user interface and tool capabilities are described. Examples are provided to demonstrate the analysis, scheduling, and optimization functions facilitated by the tool.
An expert system for planning and scheduling in a telerobotic environment
NASA Technical Reports Server (NTRS)
Ntuen, Celestine A.; Park, Eui H.
1991-01-01
A knowledge based approach to assigning tasks to multi-agents working cooperatively in jobs that require a telerobot in the loop was developed. The generality of the approach allows for such a concept to be applied in a nonteleoperational domain. The planning architecture known as the task oriented planner (TOP) uses the principle of flow mechanism and the concept of planning by deliberation to preserve and use knowledge about a particular task. The TOP is an open ended architecture developed with a NEXPERT expert system shell and its knowledge organization allows for indirect consultation at various levels of task abstraction. Considering that a telerobot operates in a hostile and nonstructured environment, task scheduling should respond to environmental changes. A general heuristic was developed for scheduling jobs with the TOP system. The technique is not to optimize a given scheduling criterion as in classical job and/or flow shop problems. For a teleoperation job schedule, criteria are situation dependent. A criterion selection is fuzzily embedded in the task-skill matrix computation. However, goal achievement with minimum expected risk to the human operator is emphasized.
Yu, Mi; Kang, Kyung Ja
2016-03-01
The turnover rate of new graduate nurses in Korea is twice that of all Korean nurses; job/work environment satisfaction is a known risk factor. The authors examined these factors in new graduate nurses at various transition periods. A cross-sectional survey was conducted using stratified sampling from nine regions of Korea, and 443 new graduate nurses were enrolled. Job/work environment satisfaction and turnover intention were measured. Stepwise multiple regression analysis identified the factors affecting turnover intention. The factors differed through the transition periods. At 0 to 6 months, the factors were work schedule, desired hospital, orientation duration, becoming part of a team, professional development, and practical support; at 7 to 12 months, the factors were work schedule and desired hospital; and at 13 to 18 months, the factor was professional development, which accounted for 31%, 22.9%, and 12.6%, respectively, of the reasons for turnover intention. Reducing turnover intention requires consideration of the influential factors at each transition period. Copyright 2016, SLACK Incorporated.
Compositional schedulability analysis of real-time actor-based systems.
Jaghoori, Mohammad Mahdi; de Boer, Frank; Longuet, Delphine; Chothia, Tom; Sirjani, Marjan
2017-01-01
We present an extension of the actor model with real-time, including deadlines associated with messages, and explicit application-level scheduling policies, e.g.,"earliest deadline first" which can be associated with individual actors. Schedulability analysis in this setting amounts to checking whether, given a scheduling policy for each actor, every task is processed within its designated deadline. To check schedulability, we introduce a compositional automata-theoretic approach, based on maximal use of model checking combined with testing. Behavioral interfaces define what an actor expects from the environment, and the deadlines for messages given these assumptions. We use model checking to verify that actors match their behavioral interfaces. We extend timed automata refinement with the notion of deadlines and use it to define compatibility of actor environments with the behavioral interfaces. Model checking of compatibility is computationally hard, so we propose a special testing process. We show that the analyses are decidable and automate the process using the Uppaal model checker.
Evaluation of Scheduling Methods for Multiple Runways
NASA Technical Reports Server (NTRS)
Bolender, Michael A.; Slater, G. L.
1996-01-01
Several scheduling strategies are analyzed in order to determine the most efficient means of scheduling aircraft when multiple runways are operational and the airport is operating at different utilization rates. The study compares simulation data for two and three runway scenarios to results from queuing theory for an M/D/n queue. The direction taken, however, is not to do a steady-state, or equilibrium, analysis since this is not the case during a rush period at a typical airport. Instead, a transient analysis of the delay per aircraft is performed. It is shown that the scheduling strategy that reduces the delay depends upon the density of the arrival traffic. For light traffic, scheduling aircraft to their preferred runways is sufficient; however, as the arrival rate increases, it becomes more important to separate traffic by weight class. Significant delay reduction is realized when aircraft that belong to the heavy and small weight classes are sent to separate runways with large aircraft put into the 'best' landing slot.
Economic Evaluation of a Home-Based Age-Related Macular Degeneration Monitoring System.
Wittenborn, John S; Clemons, Traci; Regillo, Carl; Rayess, Nadim; Liffmann Kruger, Danielle; Rein, David
2017-05-01
Medicare recently approved coverage of home telemonitoring for early detection of incident choroidal neovascularization (CNV) among patients with age-related macular degeneration (AMD), but no economic evaluation has yet assessed its cost-effectiveness and budgetary impact. To evaluate a home-based daily visual-field monitoring system using simulation methods and to apply the findings of the Home Monitoring of the Eye study to the US population at high risk for wet-form AMD. In this economic analysis, an evaluation of the potential cost, cost-effectiveness, and government budgetary impact of adoption of a home-based daily visual-field monitoring system among eligible Medicare patients was performed. Effectiveness and visual outcomes data from the Age-Related Eye Disease Study 2 Home Monitoring of the Eye study, treatment data from the Wills Eye Hospital Treat & Extend study, and AMD progression data from the Age-Related Eye Disease Study 1 were used to simulate the long-term effects of telemonitoring patients with CNV in one eye or large drusen and/or pigment abnormalities in both eyes. Univariate and probabilistic sensitivity analysis and an alternative scenario using the Treat & Extend study control group outcomes were used to examine uncertainty in these data and assumptions. Home telemonitoring of patients with AMD for early detection of CNV vs usual care. Incremental cost-effectiveness ratio, net present value of lifetime societal costs, and 10-year nominal government expenditures. Telemonitoring of patients with existing unilateral CNV or multiple bilateral risk factors for CNV (large drusen and retinal pigment abnormalities) incurs $907 (95% CI, -$6302 to $2809) in net lifetime societal costs, costs $1312 (95% CI, $222-$2848) per patient during 10 years from the federal government's perspective, and results in an incremental cost-effectiveness ratio of $35 663 (95% CI, cost savings to $235 613) per quality-adjusted life-year gained. Home telemonitoring of patients with AMD who are at risk for CNV was cost-effective compared with scheduled examinations alone. Monitoring patients with existing CNV in one eye is cost saving, but monitoring is generally not cost-effective among patients with low risk of CNV, including those with no or few risk factors. With Medicare coverage, monitoring incurs budgetary expenditures for the government but is cost-saving for patients at high risk of AMD. Monitoring could be cost saving to society if monitoring reduced the frequency of scheduled examinations or led to a reduction of one or more injections of ranibizumab.
Advancements in Risk-Informed Performance-Based Asset Management for Commercial Nuclear Power Plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liming, James K.; Ravindra, Mayasandra K.
2006-07-01
Over the past several years, ABSG Consulting Inc. (ABS Consulting) and the South Texas Project Nuclear Operating Company (STPNOC) have developed a decision support process and associated software for risk-informed, performance-based asset management (RIPBAM) of nuclear power plant facilities. RIPBAM applies probabilistic risk assessment (PRA) tools and techniques in the realm of plant physical and financial asset management. The RIPBAM process applies a tiered set of models and supporting performance measures (or metrics) that can ultimately be applied to support decisions affecting the allocation and management of plant resources (e.g., funding, staffing, scheduling, etc.). In general, the ultimate goal ofmore » the RIPBAM process is to continually support decision-making to maximize a facility's net present value (NPV) and long-term profitability for its owners. While the initial applications of RIPBAM have been for nuclear power stations, the methodology can easily be adapted to other types of power station or complex facility decision-making support. RIPBAM can also be designed to focus on performance metrics other than NPV and profitability (e.g., mission reliability, operational availability, probability of mission success per dollar invested, etc.). Recent advancements in the RIPBAM process focus on expanding the scope of previous RIPBAM applications to include not only operations, maintenance, and safety issues, but also broader risk perception components affecting plant owner (stockholder), operator, and regulator biases. Conceptually, RIPBAM is a comprehensive risk-informed cash flow model for decision support. It originated as a tool to help manage plant refueling outage scheduling, and was later expanded to include the full spectrum of operations and maintenance decision support. However, it differs from conventional business modeling tools in that it employs a systems engineering approach with broadly based probabilistic analysis of organizational 'value streams'. The scope of value stream inclusion in the process can be established by the user, but in its broadest applications, RIPBAM can be used to address how risk perceptions of plant owners and regulators are impacted by plant performance. Plant staffs can expand and refine RIPBAM models scope via a phased program of activities over time. This paper shows how the multi-metric uncertainty analysis feature of RIPBAM can apply a wide spectrum of decision-influencing factors to support decisions designed to maximize the probability of achieving, maintaining, and improving upon plant goals and objectives. In this paper, the authors show how this approach can be extremely valuable to plant owners and operators in supporting plant value-impacting decision-making processes. (authors)« less
Protect Yourself! How To Minimize Your Risk of an IRS Audit.
ERIC Educational Resources Information Center
Lukaszewski, Thomas; Moser, Barbara
1998-01-01
Shows how to minimize risk of an IRS audit and how to avoid traps caused by improper documentation and reporting requirements. Outlines the most likely audit areas for business tax returns. These include cash business; for sole proprietors, Schedule C; S and C corporation salary issues; shareholder loans; contractors versus employees; fringe…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-19
... and Risk Management Advisory Committee scheduled for December 2, 2010, is cancelled. This meeting was...] Joint Meeting of the Anesthetic and Life Support Drugs Advisory Committee and the Drug Safety and Risk Management Advisory Committee; Cancellation AGENCY: Food and Drug Administration, HHS. ACTION: Notice...
Budd, George T.; Barlow, William E.; Moore, Halle C.F.; Hobday, Timothy J.; Stewart, James A.; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K.; Rinn, Kristine J.; Albain, Kathy S.; Chew, Helen K.; Burton, Gary V.; Moore, Timothy D.; Srkalovic, Gordan; McGregor, Bradley A.; Flaherty, Lawrence E.; Livingston, Robert B.; Lew, Danika L.; Gralow, Julie R.; Hortobagyi, Gabriel N.
2015-01-01
Purpose To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. Patients and Methods A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Results Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor–negative/human epidermal growth factor receptor 2 (HER2) –negative tumors (P = .067), with no differences seen with hormone receptor–positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Conclusion Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor–negative/HER2-negative tumors. PMID:25422488
Budd, George T; Barlow, William E; Moore, Halle C F; Hobday, Timothy J; Stewart, James A; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K; Rinn, Kristine J; Albain, Kathy S; Chew, Helen K; Burton, Gary V; Moore, Timothy D; Srkalovic, Gordan; McGregor, Bradley A; Flaherty, Lawrence E; Livingston, Robert B; Lew, Danika L; Gralow, Julie R; Hortobagyi, Gabriel N
2015-01-01
To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor-negative/human epidermal growth factor receptor 2 (HER2) -negative tumors (P = .067), with no differences seen with hormone receptor-positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor-negative/HER2-negative tumors. © 2014 by American Society of Clinical Oncology.
DORCA II: Dynamic operations requirements and cost analysis program
NASA Technical Reports Server (NTRS)
1976-01-01
Program is written to handle logistics of acquisition and transport of personnel, equipment, and services and to determine costs, transport schedules, acquisition schedules, and fuel requirements of cargo transport.
NASA Technical Reports Server (NTRS)
Heneghan, C.
1999-01-01
The traditional centralized planning and scheduling of complex fast moving projects are value-added activites. However, centralized scheduling has some severe deficiencies that have plagued managers since the Polaris project when PERT analysis was invented.
Asaoka, Shoichi; Aritake, Sayaka; Komada, Yoko; Ozaki, Akiko; Odagiri, Yuko; Inoue, Shigeru; Shimomitsu, Teruichi; Inoue, Yuichi
2013-05-01
Workers who meet the criteria for shift work disorder (SWD) have elevated levels of risk for various health and behavioral problems. However, the impact of having SWD on shiftworkers engaged in rapid-rotation schedules is unknown. Moreover, the risk factors for the occurrence of SWD remain unclear. To clarify these issues, we conducted a questionnaire-based, cross-sectional survey on a sample of shiftworking nurses. Responses were obtained from 1202 nurses working at university hospitals in Tokyo, Japan, including 727 two-shift workers and 315 three-shift workers. The questionnaire included items relevant to age, gender, family structure, work environment, health-related quality of life (QOL), diurnal type, depressive symptoms, and SWD. Participants who reported insomnia and/or excessive sleepiness for at least 1 mo that was subjectively relevant to their shiftwork schedules were categorized as having SWD. The prevalence of SWD in the sampled shiftworking nurses was 24.4%; shiftworking nurses with SWD showed lower health-related QOL and more severe depressive symptoms, with greater rates of both actual accidents/errors and near misses, than those without SWD. The results of logistic regression analyses showed that more time spent working at night, frequent missing of nap opportunities during night work, and having an eveningness-oriented chronotype were significantly associated with SWD. The present study indicated that SWD might be associated with reduced health-related QOL and decreased work performance in shiftworking nurses on rapid-rotation schedules. The results also suggested that missing napping opportunities during night work, long nighttime working hours, and the delay of circadian rhythms are associated with the occurrence of SWD among shiftworking nurses on rapid-rotation schedules.
Flexible Coordination in Resource-Constrained Domains
1994-07-01
Experiments (TIEs) with planning technologies developed at both BBN (FMERG) and SRI ( SOCAP ). We have also exported scheduling support capabilities provided by...SRI’s SOCAP course of action (COA) plan generator. "* Development and demonstration of distributed, multi-level deployment scheduling - Through analysis...scheduler was adapted for integration with the SOCAP planning system to provide feedback on transportation feasibility during generation of the
The Impact of Block Scheduling on Various Indicators of School Success.
ERIC Educational Resources Information Center
Nichols, Joe D.
This project focused on the collection and analysis of longitudinal student data generated by six high schools from a large urban school system in the Midwest. Two of the schools recently converted to a 4 X 4 scheduling structure, while 3 additional schools have used a block-8 scheduling structure for a number of years. One school maintains a…
Risk of symptomatic dengue for foreign visitors to the 2014 FIFA World Cup in Brazil
Massad, Eduardo; Wilder-Smith, Annelies; Ximenes, Raphael; Amaku, Marcos; Lopez, Luis Fernandez; Coutinho, Francisco Antonio Bezerra; Coelho, Giovanini Evelim; da Silva, Jarbas Barbosa; Struchiner, Claudio José; Burattini, Marcelo Nascimento
2014-01-01
Brazil will host the FIFA World Cup™, the biggest single-event competition in the world, from June 12-July 13 2014 in 12 cities. This event will draw an estimated 600,000 international visitors. Brazil is endemic for dengue. Hence, attendees of the 2014 event are theoretically at risk for dengue. We calculated the risk of dengue acquisition to non-immune international travellers to Brazil, depending on the football match schedules, considering locations and dates of such matches for June and July 2014. We estimated the average per-capita risk and expected number of dengue cases for each host-city and each game schedule chosen based on reported dengue cases to the Brazilian Ministry of Health for the period between 2010-2013. On the average, the expected number of cases among the 600,000 foreigner tourists during the World Cup is 33, varying from 3-59. Such risk estimates will not only benefit individual travellers for adequate pre-travel preparations, but also provide valuable information for public health professionals and policy makers worldwide. Furthermore, estimates of dengue cases in international travellers during the World Cup can help to anticipate the theoretical risk for exportation of dengue into currently non-infected areas. PMID:24863976
Risk of symptomatic dengue for foreign visitors to the 2014 FIFA World Cup in Brazil.
Massad, Eduardo; Wilder-Smith, Annelies; Ximenes, Raphael; Amaku, Marcos; Lopez, Luis Fernandez; Coutinho, Francisco Antonio Bezerra; Coelho, Giovanini Evelim; Silva, Jarbas Barbosa da; Struchiner, Claudio José; Burattini, Marcelo Nascimento
2014-06-01
Brazil will host the FIFA World Cup™, the biggest single-event competition in the world, from June 12-July 13 2014 in 12 cities. This event will draw an estimated 600,000 international visitors. Brazil is endemic for dengue. Hence, attendees of the 2014 event are theoretically at risk for dengue. We calculated the risk of dengue acquisition to non-immune international travellers to Brazil, depending on the football match schedules, considering locations and dates of such matches for June and July 2014. We estimated the average per-capita risk and expected number of dengue cases for each host-city and each game schedule chosen based on reported dengue cases to the Brazilian Ministry of Health for the period between 2010-2013. On the average, the expected number of cases among the 600,000 foreigner tourists during the World Cup is 33, varying from 3-59. Such risk estimates will not only benefit individual travellers for adequate pre-travel preparations, but also provide valuable information for public health professionals and policy makers worldwide. Furthermore, estimates of dengue cases in international travellers during the World Cup can help to anticipate the theoretical risk for exportation of dengue into currently non-infected areas.
Causes of catastrophic failure in complex systems
NASA Astrophysics Data System (ADS)
Thomas, David A.
2010-08-01
Root causes of mission critical failures and major cost and schedule overruns in complex systems and programs are studied through the post-mortem analyses compiled for several examples, including the Hubble Space Telescope, the Challenger and Columbia Shuttle accidents, and the Three Mile Island nuclear power plant accident. The roles of organizational complexity, cognitive biases in decision making, the display of quantitative data, and cost and schedule pressure are all considered. Recommendations for mitigating the risk of similar failures in future programs are also provided.
43 CFR 3420.3-4 - Regional tract ranking, selection, environmental analysis and scheduling.
Code of Federal Regulations, 2013 CFR
2013-10-01
... coal team will make its determination after publishing notice in the Federal Register that the public... regional coal team will provide notice in the Federal Register of the date and location at least 45 days..., environmental analysis and scheduling. 3420.3-4 Section 3420.3-4 Public Lands: Interior Regulations Relating to...
43 CFR 3420.3-4 - Regional tract ranking, selection, environmental analysis and scheduling.
Code of Federal Regulations, 2014 CFR
2014-10-01
... coal team will make its determination after publishing notice in the Federal Register that the public... regional coal team will provide notice in the Federal Register of the date and location at least 45 days..., environmental analysis and scheduling. 3420.3-4 Section 3420.3-4 Public Lands: Interior Regulations Relating to...
43 CFR 3420.3-4 - Regional tract ranking, selection, environmental analysis and scheduling.
Code of Federal Regulations, 2012 CFR
2012-10-01
... coal team will make its determination after publishing notice in the Federal Register that the public... regional coal team will provide notice in the Federal Register of the date and location at least 45 days..., environmental analysis and scheduling. 3420.3-4 Section 3420.3-4 Public Lands: Interior Regulations Relating to...
Design Process Improvement for Electric CAR Harness
NASA Astrophysics Data System (ADS)
Sawatdee, Thiwarat; Chutima, Parames
2017-06-01
In an automobile parts design company, the customer satisfaction is one of the most important factors for product design. Therefore, the company employs all means to focus its product design process based on the various requirements of customers resulting in high number of design changes. The objective of this research is to improve the design process of the electric car harness that effects the production scheduling by using Fault Tree Analysis (FTA) and Failure Mode and Effect Analysis (FMEA) as the main tools. FTA is employed for root cause analysis and FMEA is used to ranking a High Risk Priority Number (RPN) which is shows the priority of factors in the electric car harness that have high impact to the design of the electric car harness. After the implementation, the improvements are realized significantly since the number of design change is reduced from 0.26% to 0.08%.
Endoscopic versus traditional saphenous vein harvesting: a prospective, randomized trial.
Allen, K B; Griffith, G L; Heimansohn, D A; Robison, R J; Matheny, R G; Schier, J J; Fitzgerald, E B; Shaar, C J
1998-07-01
Saphenous vein harvested with a traditional longitudinal technique often results in leg wound complications. An alternative endoscopic harvest technique may decrease these complications. One hundred twelve patients scheduled for elective coronary artery bypass grafting were prospectively randomized to have vein harvested using either an endoscopic (group A, n = 54) or traditional technique (group B, n = 58). Groups A and B, respectively, were similar with regard to length of vein harvested (41 +/- 8 cm versus 40 +/- 14 cm), bypasses done (4.1 +/- 1.1 versus 4.2 +/- 1.4), age, preoperative risk stratification, and risks for wound complication (diabetes, sex, obesity, preoperative anemia, hypoalbuminemia, and peripheral vascular disease). Leg wound complications were significantly (p < or = 0.02) reduced in group A (4% [2 of 51] versus 19% [11 of 58]). Univariate analysis identified traditional incision (p < or = 0.02) and diabetes (p < or = 0.05) as wound complication risk factors. Multiple logistic regression analysis identified only the traditional harvest technique as a risk factor for leg wound complications with no significant interaction between harvest technique and any preoperative risk factor (p < or = 0.03). Harvest rate (0.9 +/- 0.4 cm/min versus 1.2 +/- 0.5 cm/min) was slower for group A (p < or = 0.02) and conversion from endoscopic to a traditional harvest occurred in 5.6% (3 of 54) of patients. In a prospective, randomized trial, saphenous vein harvested endoscopically was associated with fewer wound complications than the traditional longitudinal method.
Tug fleet and ground operations schedules and controls. Volume 2: part 1
NASA Technical Reports Server (NTRS)
1975-01-01
This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.
Novel Hybrid Scheduling Technique for Sensor Nodes with Mixed Criticality Tasks.
Micea, Mihai-Victor; Stangaciu, Cristina-Sorina; Stangaciu, Valentin; Curiac, Daniel-Ioan
2017-06-26
Sensor networks become increasingly a key technology for complex control applications. Their potential use in safety- and time-critical domains has raised the need for task scheduling mechanisms specially adapted to sensor node specific requirements, often materialized in predictable jitter-less execution of tasks characterized by different criticality levels. This paper offers an efficient scheduling solution, named Hybrid Hard Real-Time Scheduling (H²RTS), which combines a static, clock driven method with a dynamic, event driven scheduling technique, in order to provide high execution predictability, while keeping a high node Central Processing Unit (CPU) utilization factor. From the detailed, integrated schedulability analysis of the H²RTS, a set of sufficiency tests are introduced and demonstrated based on the processor demand and linear upper bound metrics. The performance and correct behavior of the proposed hybrid scheduling technique have been extensively evaluated and validated both on a simulator and on a sensor mote equipped with ARM7 microcontroller.
Fritz, Jennifer N; Jackson, Lynsey M; Stiefler, Nicole A; Wimberly, Barbara S; Richardson, Amy R
2017-07-01
The effects of noncontingent reinforcement (NCR) without extinction during treatment of problem behavior maintained by social positive reinforcement were evaluated for five individuals diagnosed with autism spectrum disorder. A continuous NCR schedule was gradually thinned to a fixed-time 5-min schedule. If problem behavior increased during NCR schedule thinning, a continuous NCR schedule was reinstated and NCR schedule thinning was repeated with differential reinforcement of alternative behavior (DRA) included. Results showed an immediate decrease in all participants' problem behavior during continuous NCR, and problem behavior maintained at low levels during NCR schedule thinning for three participants. Problem behavior increased and maintained at higher rates during NCR schedule thinning for two other participants; however, the addition of DRA to the intervention resulted in decreased problem behavior and increased mands. © 2017 Society for the Experimental Analysis of Behavior.
Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W
2017-01-01
Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.
Performance analysis of a large-grain dataflow scheduling paradigm
NASA Technical Reports Server (NTRS)
Young, Steven D.; Wills, Robert W.
1993-01-01
A paradigm for scheduling computations on a network of multiprocessors using large-grain data flow scheduling at run time is described and analyzed. The computations to be scheduled must follow a static flow graph, while the schedule itself will be dynamic (i.e., determined at run time). Many applications characterized by static flow exist, and they include real-time control and digital signal processing. With the advent of computer-aided software engineering (CASE) tools for capturing software designs in dataflow-like structures, macro-dataflow scheduling becomes increasingly attractive, if not necessary. For parallel implementations, using the macro-dataflow method allows the scheduling to be insulated from the application designer and enables the maximum utilization of available resources. Further, by allowing multitasking, processor utilizations can approach 100 percent while they maintain maximum speedup. Extensive simulation studies are performed on 4-, 8-, and 16-processor architectures that reflect the effects of communication delays, scheduling delays, algorithm class, and multitasking on performance and speedup gains.
An assessment of PERT as a technique for schedule planning and control
NASA Technical Reports Server (NTRS)
Sibbers, C. W.
1982-01-01
The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.
Analysis of sequencing and scheduling methods for arrival traffic
NASA Technical Reports Server (NTRS)
Neuman, Frank; Erzberger, Heinz
1990-01-01
The air traffic control subsystem that performs scheduling is discussed. The function of the scheduling algorithms is to plan automatically the most efficient landing order and to assign optimally spaced landing times to all arrivals. Several important scheduling algorithms are described and the statistical performance of the scheduling algorithms is examined. Scheduling brings order to an arrival sequence for aircraft. First-come-first-served scheduling (FCFS) establishes a fair order, based on estimated times of arrival, and determines proper separations. Because of the randomness of the traffic, gaps will remain in the scheduled sequence of aircraft. These gaps are filled, or partially filled, by time-advancing the leading aircraft after a gap while still preserving the FCFS order. Tightly scheduled groups of aircraft remain with a mix of heavy and large aircraft. Separation requirements differ for different types of aircraft trailing each other. Advantage is taken of this fact through mild reordering of the traffic, thus shortening the groups and reducing average delays. Actual delays for different samples with the same statistical parameters vary widely, especially for heavy traffic.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marsh, G.M.; Callahan, C.; Pavlock, D.
In 1986, the Drake Health Registry Study initiated bladder cancer screening for 366 persons at high risk because of occupational exposure to beta-naphthylamine. The Drake Health Registry Study screening protocol consists of urinalysis, Papanicolaou cytology, and quantitative fluorescence image analysis. A positive screening test qualifies participants for a full diagnostic evaluation. The screening protocol has been modified during the first 3 years of the program's existence to address unexpected patterns of test results and to incorporate advances in screening technology. The current protocol, which has a two-tiered screening schedule, has been utilized successfully for 15 months. Of the 26 positivemore » results to date most have been based on abnormal Papanicolaou cytology and/or quantitative fluorescence image analysis. Bladder abnormalities were cited among most of the 18 study members who underwent diagnostic evaluation, including chronic cystitis, inflammation, hyperplasia, and dysplasia. We conclude that the screening program is detecting very early changes in a relatively young cohort and that these persons must be monitored over a number of years to ensure adequate medical surveillance.« less
Risk factors for common mental disorders in women. Population-based longitudinal study.
Patel, Vikram; Kirkwood, Betty R; Pednekar, Sulochana; Weiss, Helen; Mabey, David
2006-12-01
The determinants of common mental disorders in women have not been described in longitudinal studies from a low-income country. Population-based cohort study of 2494 women aged 18 to 50 years, in India. The Revised Clinical Interview Schedule was used for the detection of common mental disorders. There were 39 incident cases of common mental disorder in 2166 participants eligible for analysis (12-month rate 1.8%, 95% CI 1.3-2.4%). The following baseline factors were independently associated with the risk for common mental disorder: poverty (low income and having difficulty making ends meet); being married as compared with being single; use of tobacco; experiencing abnormal vaginal discharge; reporting a chronic physical illness; and having higher psychological symptom scores at baseline. Programmes to reduce the burden of common mental disorder in women should target poorer women, women with chronic physical illness and who have gynaecological symptoms, and women who use tobacco.
Medication Waste Reduction in Pediatric Pharmacy Batch Processes
Veltri, Michael A.; Hamrock, Eric; Mollenkopf, Nicole L.; Holt, Kristen; Levin, Scott
2014-01-01
OBJECTIVES: To inform pediatric cart-fill batch scheduling for reductions in pharmaceutical waste using a case study and simulation analysis. METHODS: A pre and post intervention and simulation analysis was conducted during 3 months at a 205-bed children's center. An algorithm was developed to detect wasted medication based on time-stamped computerized provider order entry information. The algorithm was used to quantify pharmaceutical waste and associated costs for both preintervention (1 batch per day) and postintervention (3 batches per day) schedules. Further, simulation was used to systematically test 108 batch schedules outlining general characteristics that have an impact on the likelihood for waste. RESULTS: Switching from a 1-batch-per-day to a 3-batch-per-day schedule resulted in a 31.3% decrease in pharmaceutical waste (28.7% to 19.7%) and annual cost savings of $183,380. Simulation results demonstrate how increasing batch frequency facilitates a more just-in-time process that reduces waste. The most substantial gains are realized by shifting from a schedule of 1 batch per day to at least 2 batches per day. The simulation exhibits how waste reduction is also achievable by avoiding batch preparation during daily time periods where medication administration or medication discontinuations are frequent. Last, the simulation was used to show how reducing batch preparation time per batch provides some, albeit minimal, opportunity to decrease waste. CONCLUSIONS: The case study and simulation analysis demonstrate characteristics of batch scheduling that may support pediatric pharmacy managers in redesign toward minimizing pharmaceutical waste. PMID:25024671
Medication waste reduction in pediatric pharmacy batch processes.
Toerper, Matthew F; Veltri, Michael A; Hamrock, Eric; Mollenkopf, Nicole L; Holt, Kristen; Levin, Scott
2014-04-01
To inform pediatric cart-fill batch scheduling for reductions in pharmaceutical waste using a case study and simulation analysis. A pre and post intervention and simulation analysis was conducted during 3 months at a 205-bed children's center. An algorithm was developed to detect wasted medication based on time-stamped computerized provider order entry information. The algorithm was used to quantify pharmaceutical waste and associated costs for both preintervention (1 batch per day) and postintervention (3 batches per day) schedules. Further, simulation was used to systematically test 108 batch schedules outlining general characteristics that have an impact on the likelihood for waste. Switching from a 1-batch-per-day to a 3-batch-per-day schedule resulted in a 31.3% decrease in pharmaceutical waste (28.7% to 19.7%) and annual cost savings of $183,380. Simulation results demonstrate how increasing batch frequency facilitates a more just-in-time process that reduces waste. The most substantial gains are realized by shifting from a schedule of 1 batch per day to at least 2 batches per day. The simulation exhibits how waste reduction is also achievable by avoiding batch preparation during daily time periods where medication administration or medication discontinuations are frequent. Last, the simulation was used to show how reducing batch preparation time per batch provides some, albeit minimal, opportunity to decrease waste. The case study and simulation analysis demonstrate characteristics of batch scheduling that may support pediatric pharmacy managers in redesign toward minimizing pharmaceutical waste.
An Analysis of Shuttle Crew Scheduling Violations
NASA Technical Reports Server (NTRS)
Bristol, Douglas
2012-01-01
From the early years of the Space Shuttle program, National Aeronautics and Space Administration (NASA) Shuttle crews have had a timeline of activities to guide them through their time on-orbit. Planners used scheduling constraints to build timelines that ensured the health and safety of the crews. If a constraint could not be met it resulted in a violation. Other agencies of the federal government also have scheduling constraints to ensure the safety of personnel and the public. This project examined the history of Space Shuttle scheduling constraints, constraints from Federal agencies and branches of the military and how these constraints may be used as a guide for future NASA and private spacecraft. This was conducted by reviewing rules and violations with regard to human aerospace scheduling constraints, environmental, political, social and technological factors, operating environment and relevant human factors. This study includes a statistical analysis of Shuttle Extra Vehicular Activity (EVA) related violations to determine if these were a significant producer of constraint violations. It was hypothesized that the number of SCSC violations caused by EVA activities were a significant contributor to the total number of violations for Shuttle/ISS missions. Data was taken from NASA data archives at the Johnson Space Center from Space Shuttle/ISS missions prior to the STS-107 accident. The results of the analysis rejected the null hypothesis and found that EVA violations were a significant contributor to the total number of violations. This analysis could help NASA and commercial space companies understand the main source of constraint violations and allow them to create constraint rules that ensure the safe operation of future human private and exploration missions. Additional studies could be performed to evaluate other variables that could have influenced the scheduling violations that were analyzed.
Operations research methods improve chemotherapy patient appointment scheduling.
Santibáñez, Pablo; Aristizabal, Ruben; Puterman, Martin L; Chow, Vincent S; Huang, Wenhai; Kollmannsberger, Christian; Nordin, Travis; Runzer, Nancy; Tyldesley, Scott
2012-12-01
Clinical complexity, scheduling restrictions, and outdated manual booking processes resulted in frequent clerical rework, long waitlists for treatment, and late appointment notification for patients at a chemotherapy clinic in a large cancer center in British Columbia, Canada. A 17-month study was conducted to address booking, scheduling and workload issues and to develop, implement, and evaluate solutions. A review of scheduling practices included process observation and mapping, analysis of historical appointment data, creation of a new performance metric (final appointment notification lead time), and a baseline patient satisfaction survey. Process improvement involved discrete event simulation to evaluate alternative booking practice scenarios, development of an optimization-based scheduling tool to improve scheduling efficiency, and change management for implementation of process changes. Results were evaluated through analysis of appointment data, a follow-up patient survey, and staff surveys. Process review revealed a two-stage scheduling process. Long waitlists and late notification resulted from an inflexible first-stage process. The second-stage process was time consuming and tedious. After a revised, more flexible first-stage process and an automated second-stage process were implemented, the median percentage of appointments exceeding the final appointment notification lead time target of one week was reduced by 57% and median waitlist size decreased by 83%. Patient surveys confirmed increased satisfaction while staff feedback reported reduced stress levels. Significant operational improvements can be achieved through process redesign combined with operations research methods.
Diverse task scheduling for individualized requirements in cloud manufacturing
NASA Astrophysics Data System (ADS)
Zhou, Longfei; Zhang, Lin; Zhao, Chun; Laili, Yuanjun; Xu, Lida
2018-03-01
Cloud manufacturing (CMfg) has emerged as a new manufacturing paradigm that provides ubiquitous, on-demand manufacturing services to customers through network and CMfg platforms. In CMfg system, task scheduling as an important means of finding suitable services for specific manufacturing tasks plays a key role in enhancing the system performance. Customers' requirements in CMfg are highly individualized, which leads to diverse manufacturing tasks in terms of execution flows and users' preferences. We focus on diverse manufacturing tasks and aim to address their scheduling issue in CMfg. First of all, a mathematical model of task scheduling is built based on analysis of the scheduling process in CMfg. To solve this scheduling problem, we propose a scheduling method aiming for diverse tasks, which enables each service demander to obtain desired manufacturing services. The candidate service sets are generated according to subtask directed graphs. An improved genetic algorithm is applied to searching for optimal task scheduling solutions. The effectiveness of the scheduling method proposed is verified by a case study with individualized customers' requirements. The results indicate that the proposed task scheduling method is able to achieve better performance than some usual algorithms such as simulated annealing and pattern search.
Intimate Partner Violence Is Associated with Suicidality Among Low-Income Postpartum Women.
Tabb, Karen M; Huang, Hsiang; Valdovinos, Miriam; Toor, Raman; Ostler, Teresa; Vanderwater, Erin; Wang, Yang; Menezes, Paulo Rossi; Faisal-Cury, Alexandre
2018-02-01
Although intimate partner violence (IPV) during perinatal period is more common than during other maternal health conditions, it receives less attention within research on maternal mortality rates. Given the risks for maternal mortality because of suicidality, the purpose of this investigation is to examine the risk of suicidal ideation (SI) among postpartum women exposed to IPV. In this cross-sectional study, participants were recruited between May 2005 and March 2007 from primary care clinics in São Paulo, Brazil. A total of 701 postpartum women were included in the analysis. Postpartum SI was assessed using the clinical interview schedule-revised. IPV was assessed using a structured questionnaire previously validated in Brazilian populations. Crude and adjusted risk ratios with 95% confidence intervals (95% CI) were estimated using Poisson regression with robust variance to examine the association between IPV and the risk for postpartum SI. The prevalence of postpartum SI was 4%. Among those with postpartum SI, 70% reported IPV during the postpartum period. Compared with non-IPV counterparts, postpartum women who reported IPV had an increased risk for SI (relative risk [RR] 7.25, 95% CI: 3.23-16.27). In the fully adjusted model, the risk for SI remained significantly higher for women who experienced IPV than for those who did not (RR 3.02, 95% CI: 1.29-7.07). Postpartum women exposed to violence had a threefold greater risk of having suicidal thoughts.
van den Heuvel, M; Chen, Y; Abdullah, K; Maguire, J L; Parkin, P C; Birken, C S
2017-12-01
Early childhood temperament is increasingly recognized as an important attribute that may impact screen time use, outdoor play and childhood obesity. The relationship between temperament and nutrition in preschool children is less clear. The objective of the study is to investigate if temperament dimensions (negative affectivity, effortful control and surgency) in early childhood are associated with nutritional risk factors. Six hundred seventy-eight children were followed (mean age at baseline visit 3.1 years; mean time to follow-up 16.5 months). Parents reported on child temperament and nutritional risk factors during regularly scheduled well-child clinic visits. A mixed effect model demonstrated a significant association between higher negative affectivity (1.03; 95% CI 0.69 to 1.37) and higher effortful control (-0.88; 95% CI -1.27 to -0.49) on concurrent nutritional risk, independent of covariates. Multivariate linear regression analysis identified that higher effortful control, and not negative affectivity, was significantly associated with a decrease in nutritional risk (-0.67; 95% CI -1.10 to -0.24) over time, independent of covariates. There was no relationship identified between surgency and nutritional risk. Three-year-old children with higher effortful control had reduced nutritional risk at 5 years of age. Future nutritional risk prevention strategies may benefit from interventions to increase effortful control in early childhood. © 2016 World Obesity Federation.
Vaccination for safe travel to India.
Mehta, Bharti; Jindal, Harashish; Bhatt, Bhumika; Kumar, Vijay; Singh Choudhary, Satvinder
2014-01-01
Worldwide more than 900 million international journeys are undertaken every year. India is one of the favorite tourist destinations around the world. International travel exposes travelers to a range of health risks. Traveling to India possess a threat to travelers with waterborne diseases like bacterial diarrhea, hepatitis A and E, and typhoid fever; vector borne diseases like dengue fever, Japanese encephalitis, and malaria; animal contact disease like rabies. Furthermore diseases spreading through behavior aspects cannot be ruled out hence posing a risk for hepatitis B, HIV/AIDS, hepatitis C as well. Hence, before travel the travelers are advised about the risk of disease in the country or countries they plan to visit and the steps to be taken to prevent illness. Vaccination offers the possibility of avoiding a number of infectious diseases that may be countered abroad. There is no single vaccination schedule that fits all travelers. Each schedule must be individualized according to the traveler's previous immunizations, countries to be visited, type and duration of travel, and the amount of time available before departure.
Risk Mitigation for the Development of the New Ariane 5 On-Board Computer
NASA Astrophysics Data System (ADS)
Stransky, Arnaud; Chevalier, Laurent; Dubuc, Francois; Conde-Reis, Alain; Ledoux, Alain; Miramont, Philippe; Johansson, Leif
2010-08-01
In the frame of the Ariane 5 production, some equipment will become obsolete and need to be redesigned and redeveloped. This is the case for the On-Board Computer, which has to be completely redesigned and re-qualified by RUAG Space, as well as all its on-board software and associated development tools by ASTRIUM ST. This paper presents this obsolescence treatment, which has started in 2007 under an ESA contract, in the frame of ACEP and ARTA accompaniment programmes, and is very critical in technical term but also from schedule point of view: it gives the context and overall development plan, and details the risk mitigation actions agreed with ESA, especially those related to the development of the input/output ASIC, and also the on-board software porting and revalidation strategy. The efficiency of these risk mitigation actions has been proven by the outcome schedule; this development constitutes an up-to-date case for good practices, including some experience report and feedback for future other developments.
Exercise--A Preventive Prescription.
ERIC Educational Resources Information Center
Pollock, Michael L.
1979-01-01
School health and physical education programs are encouraged to increase scheduled time and incorporate regular endurance and physical fitness activities into other programs to reduce the risk factors of coronary heart disease. (JMF)
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2010 CFR
2010-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2011 CFR
2011-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2014 CFR
2014-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2013 CFR
2013-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
40 CFR 131.7 - Dispute resolution mechanism.
Code of Federal Regulations, 2012 CFR
2012-07-01
... parties, to study the problem and recommend an appropriate solution. (iv) The procedure and schedule for... dischargers, comparative risks to public health and the environment, economic impacts, present and historical...
A Method for Dynamic Risk Assessment and Management of Rockbursts in Drill and Blast Tunnels
NASA Astrophysics Data System (ADS)
Liu, Guo-Feng; Feng, Xia-Ting; Feng, Guang-Liang; Chen, Bing-Rui; Chen, Dong-Fang; Duan, Shu-Qian
2016-08-01
Focusing on the problems caused by rockburst hazards in deep tunnels, such as casualties, damage to construction equipment and facilities, construction schedule delays, and project cost increase, this research attempts to present a methodology for dynamic risk assessment and management of rockbursts in D&B tunnels. The basic idea of dynamic risk assessment and management of rockbursts is determined, and methods associated with each step in the rockburst risk assessment and management process are given, respectively. Among them, the main parts include a microseismic method for early warning the occurrence probability of rockburst risk, an estimation method that aims to assess potential consequences of rockburst risk, an evaluation method that utilizes a new quantitative index considering both occurrence probability and consequences for determining the level of rockburst risk, and the dynamic updating. Specifically, this research briefly describes the referenced microseismic method of warning rockburst, but focuses on the analysis of consequences and associated risk assessment and management of rockburst. Using the proposed method of risk assessment and management of rockburst, the occurrence probability, potential consequences, and the level of rockburst risk can be obtained in real-time during tunnel excavation, which contributes to the dynamic optimisation of risk mitigation measures and their application. The applicability of the proposed method has been verified by those cases from the Jinping II deep headrace and water drainage tunnels at depths of 1900-2525 m (with a length of 11.6 km in total for D&B tunnels).
Ridgeway, Jennifer L; LeBlanc, Annie; Branda, Megan; Harms, Roger W; Morris, Megan A; Nesbitt, Kate; Gostout, Bobbie S; Barkey, Lenae M; Sobolewski, Susan M; Brodrick, Ellen; Inselman, Jonathan; Baron, Anne; Sivly, Angela; Baker, Misty; Finnie, Dawn; Chaudhry, Rajeev; Famuyide, Abimbola O
2015-12-02
Most low-risk pregnant women receive the standard model of prenatal care with frequent office visits. Research suggests that a reduced schedule of visits among low-risk women could be implemented without increasing adverse maternal or fetal outcomes, but patient satisfaction with these models varies. We aim to determine the effectiveness and feasibility of a new prenatal care model (OB Nest) that enhances a reduced visit model by adding virtual connections that improve continuity of care and patient-directed access to care. This mixed-methods study uses a hybrid effectiveness-implementation design in a single center randomized controlled trial (RCT). Embedding process evaluation in an experimental design like an RCT allows researchers to answer both "Did it work?" and "How or why did it work (or not work)?" when studying complex interventions, as well as providing knowledge for translation into practice after the study. The RE-AIM framework was used to ensure attention to evaluating program components in terms of sustainable adoption and implementation. Low-risk patients recruited from the Obstetrics Division at Mayo Clinic (Rochester, MN) will be randomized to OB Nest or usual care. OB Nest patients will be assigned to a dedicated nursing team, scheduled for 8 pre-planned office visits with a physician or midwife and 6 telephone or online nurse visits (compared to 12 pre-planned physician or midwife office visits in the usual care group), and provided fetal heart rate and blood pressure home monitoring equipment and information on joining an online care community. Quantitative methods will include patient surveys and medical record abstraction. The primary quantitative outcome is patient-reported satisfaction. Other outcomes include fidelity to items on the American Congress of Obstetricians and Gynecologists standards of care list, health care utilization (e.g. numbers of antenatal office visits), and maternal and fetal outcomes (e.g. gestational age at delivery), as well as validated patient-reported measures of pregnancy-related stress and perceived quality of care. Quantitative analysis will be performed according to the intention to treat principle. Qualitative methods will include interviews and focus groups with providers, staff, and patients, and will explore satisfaction, intervention adoption, and implementation feasibility. We will use methods of qualitative thematic analysis at three stages. Mixed methods analysis will involve the use of qualitative data to lend insight to quantitative findings. This study will make important contributions to the literature on reduced visit models by evaluating a novel prenatal care model with components to increase patient connectedness (even with fewer pre-scheduled office visits), as demonstrated on a range of patient-important outcomes. The use of a hybrid effectiveness-implementation approach, as well as attention to patient and provider perspectives on program components and implementation, may uncover important information that can inform long-term feasibility and potentially speed future translation. Trial registration identifier: NCT02082275 Submitted: March 6, 2014.
Estimating the cost of major ongoing cost plus hardware development programs
NASA Technical Reports Server (NTRS)
Bush, J. C.
1990-01-01
Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.
ERIC Educational Resources Information Center
Gill, Willie Wallicia Allen
2011-01-01
The purpose of this quantitative study was to examine whether a difference existed in the percentage performance of students earning a pass/advanced score on the Standards of Learning (SOL) Test in math and reading in Virginia's Region IV for schools using an A/B block schedule and those using a traditional schedule. The research also examined if…
A Regression Analysis of South Carolina Algebra I End-of-Course Exam Scores by Schedule Type
ERIC Educational Resources Information Center
Smith, Dawn M.
2017-01-01
The purpose of this study was to examine the relationship between scheduling and first-year-high-school students' exam scores on the South Carolina Algebra I End-of-Course (EOC) assessment. The study compared existing empirical data from two southeastern high schools from the same school district using 4 X 4 block schedules from 2011-2014 and…
Guidance and Control Software,
1980-05-01
commitments of function, cost, and schedule . The phrase "software engineering" was intended to contrast with the phrase "computer science" the latter aims...the software problems of cost, delivery schedule , and quality were gradually being recognized at the highest management levels. Thus, in a project... schedule dates. Although the analysis of software problems indicated that the entire software development process (figure 1) needed new methods, only
Integrated Risk Management Within NASA Programs/Projects
NASA Technical Reports Server (NTRS)
Connley, Warren; Rad, Adrian; Botzum, Stephen
2004-01-01
As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.
12 CFR Appendix A to Subpart B of... - Risk-Based Capital Stress Test
Code of Federal Regulations, 2013 CFR
2013-01-01
... Loan Number Ending Scheduled Balance Group Pre/Post Act Property State Product Type Origination Date... t-test 2 of the differences in the means for the group of defaulted loans and active loans indicated... of pre-1996 loan volume being transferred to post-1996 loan volume. The interest rate risk and credit...
12 CFR Appendix A to Subpart B of... - Risk-Based Capital Stress Test
Code of Federal Regulations, 2012 CFR
2012-01-01
... Loan Number Ending Scheduled Balance Group Pre/Post Act Property State Product Type Origination Date... t-test 2 of the differences in the means for the group of defaulted loans and active loans indicated... of pre-1996 loan volume being transferred to post-1996 loan volume. The interest rate risk and credit...
12 CFR Appendix A to Subpart B of... - Risk-Based Capital Stress Test
Code of Federal Regulations, 2014 CFR
2014-01-01
... Loan Number Ending Scheduled Balance Group Pre/Post Act Property State Product Type Origination Date... t-test 2 of the differences in the means for the group of defaulted loans and active loans indicated... of pre-1996 loan volume being transferred to post-1996 loan volume. The interest rate risk and credit...
Know the Risks: Transporting Students in Private Vehicles
ERIC Educational Resources Information Center
Mahoney, Dan
2011-01-01
Scheduling off-campus extracurricular activities is not the issue, but how to get students there can present a problem. The transportation of students by staff in their private cars for extracurricular activities is common and occurs chiefly as a matter of convenience or cost saving. But it is not without risks. In general, the best solution for…
This product is an invited webinar to the Society of Toxicology Risk Assessment Specialty Section (co-hosted by the Mixtures Specialty Section) as part of their monthly webinar series. The webinar is scheduled for 3:00PM on Wednesday September 13th.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper under a hardship exemption in 17... or amendment, in electronic format via the Commission's Electronic Data Gathering, Analysis, and... Act. Part I—Information Required To Be Sent to Shareholders Item 1. Home Jurisdiction Documents (a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper under a hardship exemption in 17... or amendment, in electronic format via the Commission's Electronic Data Gathering, Analysis, and... Act. Part I—Information Required To Be Sent to Shareholders Item 1. Home Jurisdiction Documents (a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper under a hardship exemption in 17... or amendment, in electronic format via the Commission's Electronic Data Gathering, Analysis, and... Act. Part I—Information Required To Be Sent to Shareholders Item 1. Home Jurisdiction Documents (a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper under a hardship exemption in 17... or amendment, in electronic format via the Commission's Electronic Data Gathering, Analysis, and... Act. Part I—Information Required To Be Sent to Shareholders Item 1. Home Jurisdiction Documents (a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper under a hardship exemption in 17... or amendment, in electronic format via the Commission's Electronic Data Gathering, Analysis, and... Act. Part I—Information Required To Be Sent to Shareholders Item 1. Home Jurisdiction Documents (a...
Spatial analysis of fuel treatment options for chaparral on the Angeles national forest
G. Jones; J. Chew; R. Silverstein; C. Stalling; J. Sullivan; J. Troutwine; D. Weise; D. Garwood
2008-01-01
Spatial fuel treatment schedules were developed for the chaparral vegetation type on the Angeles National Forest using the Multi-resource Analysis and Geographic Information System (MAGIS). Schedules varied by the priority given to various wildland urban interface areas and the general forest, as well as by the number of acres treated per decade. The effectiveness of...
Lu, Lingbo; Li, Jingshan; Gisler, Paula
2011-06-01
Radiology tests, such as MRI, CT-scan, X-ray and ultrasound, are cost intensive and insurance pre-approvals are necessary to get reimbursement. In some cases, tests may be denied for payments by insurance companies due to lack of pre-approvals, inaccurate or missing necessary information. This can lead to substantial revenue losses for the hospital. In this paper, we present a simulation study of a centralized scheduling process for outpatient radiology tests at a large community hospital (Central Baptist Hospital in Lexington, Kentucky). Based on analysis of the central scheduling process, a simulation model of information flow in the process has been developed. Using such a model, the root causes of financial losses associated with errors and omissions in this process were identified and analyzed, and their impacts were quantified. In addition, "what-if" analysis was conducted to identify potential process improvement strategies in the form of recommendations to the hospital leadership. Such a model provides a quantitative tool for continuous improvement and process control in radiology outpatient test scheduling process to reduce financial losses associated with process error. This method of analysis is also applicable to other departments in the hospital.
Chakrabarty, Sabarni; Sarkar, Krishnendu; Dev, Samrat; Das, Tamal; Mitra, Kalpita; Sahu, Subhashis; Gangopadhyay, Somnath
2016-01-01
Objectives: This study aimed to determine risk factors that predict musculoskeletal discomfort in Chikan embroiderers of West Bengal, India, and to compare the effect of two rest break schedules to reduce these symptoms. Methods: The Nordic musculoskeletal questionnaire was performed on 400 Chikan embroiderers at baseline containing questions on job autonomy, working behavior, and work stress factors. Relative risk was calculated to identify prognostic factors for musculoskeletal discomfort in different body regions. Two groups of workers received two rest break schedules for 4 months and compared in a between-subject design. Outcome variables were scores of Body Part Discomfort (BPD) scale. Results: Chikan embroiderers are afflicted with musculoskeletal discomfort mainly in the lower back, neck/shoulder and wrist/forearm region, which is attributed to their prolonged working timeinvolving hands and wrists, being in a static seating posture. Rigidity in working methods, prolonged working time, inadequate rest break during the working day, dissatisfaction regarding earning, monotonous work, static sitting posture, and repetitive movement of wrist and forearm were the significant predictors of these symptom developments. Rest break schedule 1 with more frequent and shorter breaks had more significant improvement on the severity of these musculoskeletal discomforts. Conclusions: Chikan embroiderers perform a highly dreary occupation and various ergonomics conditions work as predictors for developing musculoskeletal discomforts among them. Design of proper rest break schedule involving shorter and frequent breaks was competent for reducing these discomforts to a certain extent. PMID:27265529
Reinventing The Design Process: Teams and Models
NASA Technical Reports Server (NTRS)
Wall, Stephen D.
1999-01-01
The future of space mission designing will be dramatically different from the past. Formerly, performance-driven paradigms emphasized data return with cost and schedule being secondary issues. Now and in the future, costs are capped and schedules fixed-these two variables must be treated as independent in the design process. Accordingly, JPL has redesigned its design process. At the conceptual level, design times have been reduced by properly defining the required design depth, improving the linkages between tools, and managing team dynamics. In implementation-phase design, system requirements will be held in crosscutting models, linked to subsystem design tools through a central database that captures the design and supplies needed configuration management and control. Mission goals will then be captured in timelining software that drives the models, testing their capability to execute the goals. Metrics are used to measure and control both processes and to ensure that design parameters converge through the design process within schedule constraints. This methodology manages margins controlled by acceptable risk levels. Thus, teams can evolve risk tolerance (and cost) as they would any engineering parameter. This new approach allows more design freedom for a longer time, which tends to encourage revolutionary and unexpected improvements in design.
Illicit online marketing of lorcaserin before DEA scheduling.
Liang, Bryan A; Mackey, Tim K; Archer-Hayes, Ashley N; Shinn, Linda M
2013-05-01
Antiobesity drugs have been marketed illicitly by "no prescription" online pharmacies after approval and scheduling by the drug enforcement agency. We assess whether antiobesity drug Belviq® (lorcaserin HCl) was available from illicit online vendors before DEA-scheduling when sales are unauthorized. Online searches of "buy Belviq no prescription" examining first five result pages marketing the drug. Searches were performed from 11/5/2012-12/8/2012, prior to DEA scheduing. Belviq® is actively marketed by "no prescription" online vendors despite official unavailability and prescription requirements. Approaches included direct-to-consumer advertising using descriptive website URLs; linking to illicit marketers; and directing customers to other weight-loss websites for additional marketing. Finally, large quantities were marketed by business-to-business vendors. Illicit online "no prescription" pharmacies are marketing unauthorized, suspect antiobesity drugs before DEA scheduling and permitted marketing. Regulators must legally intercede to ensure patient safety, and providers must educate patients about online-sourcing risks. Copyright © 2013 The Obesity Society.
Exploratory Model Analysis of the Space Based Infrared System (SBIRS) Low Global Scheduler Problem
1999-12-01
solution. The non- linear least squares model is defined as Y = f{e,t) where: 0 =M-element parameter vector Y =N-element vector of all data t...NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS EXPLORATORY MODEL ANALYSIS OF THE SPACE BASED INFRARED SYSTEM (SBIRS) LOW GLOBAL SCHEDULER...December 1999 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE EXPLORATORY MODEL ANALYSIS OF THE SPACE BASED INFRARED SYSTEM
The TJO-OAdM Robotic Observatory: the scheduler
NASA Astrophysics Data System (ADS)
Colomé, Josep; Casteels, Kevin; Ribas, Ignasi; Francisco, Xavier
2010-07-01
The Joan Oró Telescope at the Montsec Astronomical Observatory (TJO - OAdM) is a small-class observatory working under completely unattended control, due to the isolation of the site. Robotic operation is mandatory for its routine use. The level of robotization of an observatory is given by its reliability in responding to environment changes and by the required human interaction due to possible alarms. These two points establish a level of human attendance to ensure low risk at any time. But there is another key point when deciding how the system performs as a robot: the capability to adapt the scheduled observation to actual conditions. The scheduler represents a fundamental element to fully achieve an intelligent response at any time. Its main task is the mid- and short-term time optimization and it has a direct effect on the scientific return achieved by the observatory. We present a description of the scheduler developed for the TJO - OAdM, which is separated in two parts. Firstly, a pre-scheduler that makes a temporary selection of objects from the available projects according to their possibility of observation. This process is carried out before the beginning of the night following different selection criteria. Secondly, a dynamic scheduler that is executed any time a target observation is complete and a new one must be scheduled. The latter enables the selection of the best target in real time according to actual environment conditions and the set of priorities.
Pelvic floor assessment after delivery: how should women be selected?
Soligo, Marco; Livio, Stefania; De Ponti, Elena; Scebba, Ileana; Carpentieri, Federica; Serati, Maurizio; Ferrazzi, Enrico
2016-11-01
Pelvic floor dysfunction after delivery is quite common. New mothers deserve to receive targeted care for pelvic floor dysfunction, but how should women who are at risk be identified and selected for treatment? This study investigated risk factors and puerperal health-seeking behaviours to develop a restrictive patient selection model for postpartum pelvic floor dysfunction assessment. This prospective observational study involved women who were at ≥32 weeks gestational age when they delivered in a tertiary referral maternity hospital in Milan, Italy, between July and December 2014. Eligible women were scheduled for a 3-month postnatal pelvic floor clinic. The adherence rate to the pelvic floor clinic and the prevalence of pelvic floor dysfunctions at 3 months postpartum were recorded. Univariable and logistic multivariable analyses were performed to select risk factors for pelvic floor dysfunctions. Risk factors were then tested for sensitivity and specificity for 3-month postpartum pelvic floor dysfunctions. Of 1606 eligible women, 1293 (80.5%) were included in the analysis; 685 puerperal women (53.0%) adhered to the 3-month postnatal pelvic floor clinic; pelvic floor dysfunctions were detected in 238 women (34.7%). Four elements emerged as risk factors: symptoms before pregnancy (OR 1.72, 95% CI 1.15-2.56; p=0.008), symptoms during pregnancy (OR 2.13, 95% CI 1.49-3.06; p<0.0001), vacuum extractor use (OR 1.62, 95% CI 1.04-2.54; p=0.034), and severe perineal tears (OR 19.45, 95% CI 2.42-156.15; p=0.005). The combined sensitivity and specificity for the 4 risk factors were 82% and 39%, respectively. Internal risk factors analysis offers the potential to efficiently restrict patient selection for follow-up. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Human factors issues in the design of user interfaces for planning and scheduling
NASA Technical Reports Server (NTRS)
Murphy, Elizabeth D.
1991-01-01
The purpose is to provide and overview of human factors issues that impact the effectiveness of user interfaces to automated scheduling tools. The following methods are employed: (1) a survey of planning and scheduling tools; (2) the identification and analysis of human factors issues; (3) the development of design guidelines based on human factors literature; and (4) the generation of display concepts to illustrate guidelines.
Sum-of-Squares-Based Region of Attraction Analysis for Gain-Scheduled Three-Loop Autopilot
NASA Astrophysics Data System (ADS)
Seo, Min-Won; Kwon, Hyuck-Hoon; Choi, Han-Lim
2018-04-01
A conventional method of designing a missile autopilot is to linearize the original nonlinear dynamics at several trim points, then to determine linear controllers for each linearized model, and finally implement gain-scheduling technique. The validation of such a controller is often based on linear system analysis for the linear closed-loop system at the trim conditions. Although this type of gain-scheduled linear autopilot works well in practice, validation based solely on linear analysis may not be sufficient to fully characterize the closed-loop system especially when the aerodynamic coefficients exhibit substantial nonlinearity with respect to the flight condition. The purpose of this paper is to present a methodology for analyzing the stability of a gain-scheduled controller in a setting close to the original nonlinear setting. The method is based on sum-of-squares (SOS) optimization that can be used to characterize the region of attraction of a polynomial system by solving convex optimization problems. The applicability of the proposed SOS-based methodology is verified on a short-period autopilot of a skid-to-turn missile.
Supporting Space Systems Design via Systems Dependency Analysis Methodology
NASA Astrophysics Data System (ADS)
Guariniello, Cesare
The increasing size and complexity of space systems and space missions pose severe challenges to space systems engineers. When complex systems and Systems-of-Systems are involved, the behavior of the whole entity is not only due to that of the individual systems involved but also to the interactions and dependencies between the systems. Dependencies can be varied and complex, and designers usually do not perform analysis of the impact of dependencies at the level of complex systems, or this analysis involves excessive computational cost, or occurs at a later stage of the design process, after designers have already set detailed requirements, following a bottom-up approach. While classical systems engineering attempts to integrate the perspectives involved across the variety of engineering disciplines and the objectives of multiple stakeholders, there is still a need for more effective tools and methods capable to identify, analyze and quantify properties of the complex system as a whole and to model explicitly the effect of some of the features that characterize complex systems. This research describes the development and usage of Systems Operational Dependency Analysis and Systems Developmental Dependency Analysis, two methods based on parametric models of the behavior of complex systems, one in the operational domain and one in the developmental domain. The parameters of the developed models have intuitive meaning, are usable with subjective and quantitative data alike, and give direct insight into the causes of observed, and possibly emergent, behavior. The approach proposed in this dissertation combines models of one-to-one dependencies among systems and between systems and capabilities, to analyze and evaluate the impact of failures or delays on the outcome of the whole complex system. The analysis accounts for cascading effects, partial operational failures, multiple failures or delays, and partial developmental dependencies. The user of these methods can assess the behavior of each system based on its internal status and on the topology of its dependencies on systems connected to it. Designers and decision makers can therefore quickly analyze and explore the behavior of complex systems and evaluate different architectures under various working conditions. The methods support educated decision making both in the design and in the update process of systems architecture, reducing the need to execute extensive simulations. In particular, in the phase of concept generation and selection, the information given by the methods can be used to identify promising architectures to be further tested and improved, while discarding architectures that do not show the required level of global features. The methods, when used in conjunction with appropriate metrics, also allow for improved reliability and risk analysis, as well as for automatic scheduling and re-scheduling based on the features of the dependencies and on the accepted level of risk. This dissertation illustrates the use of the two methods in sample aerospace applications, both in the operational and in the developmental domain. The applications show how to use the developed methodology to evaluate the impact of failures, assess the criticality of systems, quantify metrics of interest, quantify the impact of delays, support informed decision making when scheduling the development of systems and evaluate the achievement of partial capabilities. A larger, well-framed case study illustrates how the Systems Operational Dependency Analysis method and the Systems Developmental Dependency Analysis method can support analysis and decision making, at the mid and high level, in the design process of architectures for the exploration of Mars. The case study also shows how the methods do not replace the classical systems engineering methodologies, but support and improve them.
ExMC Work Prioritization Process
NASA Technical Reports Server (NTRS)
Simon, Matthew
2015-01-01
Last year, NASA's Human Research Program (HRP) introduced the concept of a "Path to Risk Reduction" (PRR), which will provide a roadmap that shows how the work being done within each HRP element can be mapped to reducing or closing exploration risks. Efforts are currently underway within the Exploration Medical Capability (ExMC) Element to develop a structured, repeatable process for prioritizing work utilizing decision analysis techniques and risk estimation tools. The goal of this effort is to ensure that the work done within the element maximizes risk reduction for future exploration missions in a quantifiable way and better aligns with the intent and content of the Path to Risk Reduction. The Integrated Medical Model (IMM) will be used to identify those conditions that are major contributors of medical risk for a given design reference mission. For each of these conditions, potential prevention, screening, diagnosis, and treatment methods will be identified. ExMC will then aim to prioritize its potential investments in these mitigation methods based upon their potential for risk reduction and other factors such as vehicle performance impacts, near term schedule needs, duplication with external efforts, and cost. This presentation will describe the process developed to perform this prioritization and inform investment discussions in future element planning efforts. It will also provide an overview of the required input information, types of process participants, figures of merit, and the expected outputs of the process.
Coal gasification systems engineering and analysis. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1980-01-01
Feasibility analyses and systems engineering studies for a 20,000 tons per day medium Btu (MBG) coal gasification plant to be built by TVA in Northern Alabama were conducted. Major objectives were as follows: (1) provide design and cost data to support the selection of a gasifier technology and other major plant design parameters, (2) provide design and cost data to support alternate product evaluation, (3) prepare a technology development plan to address areas of high technical risk, and (4) develop schedules, PERT charts, and a work breakdown structure to aid in preliminary project planning. Volume one contains a summary of gasification system characterizations. Five gasification technologies were selected for evaluation: Koppers-Totzek, Texaco, Lurgi Dry Ash, Slagging Lurgi, and Babcock and Wilcox. A summary of the trade studies and cost sensitivity analysis is included.
The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk
NASA Technical Reports Server (NTRS)
Hansen, Patricia A.; Day, Diane; Secunda, Mark
2003-01-01
The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.
The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk
NASA Technical Reports Server (NTRS)
Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.
2004-01-01
The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matsumoto, H.; Eki, Y.; Kaji, A.
1993-12-01
An expert system which can support operators of fossil power plants in creating the optimum startup schedule and executing it accurately is described. The optimum turbine speed-up and load-up pattern is obtained through an iterative manner which is based on fuzzy resonating using quantitative calculations as plant dynamics models and qualitative knowledge as schedule optimization rules with fuzziness. The rules represent relationships between stress margins and modification rates of the schedule parameters. Simulations analysis proves that the system provides quick and accurate plant startups.
Mode of Delivery among HIV-Infected Pregnant Women in Philadelphia, 2005-2013.
Thompson, Dana R; Momplaisir, Florence M; Adams, Joëlla W; Yehia, Baligh R; Anderson, Emily A; Alleyne, Gregg; Brady, Kathleen A
2015-01-01
Current guidelines call for HIV-infected women to deliver via scheduled Caesarean when the maternal HIV viral load (VL) is >1,000 copies/ml. We describe the mode of delivery among HIV-infected women and evaluate adherence to relevant recommendations. We performed a population-based surveillance analysis of HIV-infected pregnant women in Philadelphia from 2005 to 2013, comparing mode of delivery (vaginal, scheduled Caesarean, or emergent Caesarean) by VL during pregnancy, closest to the time of delivery (≤1,000 copies/ml versus an unknown VL or VL >1,000 copies/ml) and associated factors in multivariable analysis. Our cohort included 824 deliveries from 648 HIV-infected women, of whom 69.4% had a VL ≤1,000 copies/ml and 30.6% lacked a VL or had a VL >1,000 copies/ml during pregnancy, closest to the time of delivery. Mode of delivery varied by VL: 56.6% of births were vaginal, 30.1% scheduled Caesarean, and 13.3% emergent Caesarean when the VL was ≤1,000 copies/ml; when the VL was unknown or >1,000 copies/ml, 32.9% of births were vaginal, 49.9% scheduled Caesarean and 17.5% emergent Caesarean. In multivariable analyses, Hispanic women (adjusted odds ratio (AOR) 0.17, 95% Confidence Interval (CI) 0.04-0.76) and non-Hispanic black women (AOR 0.27, 95% CI 0.10-0.77) were less to likely to deliver via scheduled Caesarean compared to non-Hispanic white women. Women who delivered prior to 38 weeks' gestation (AOR 0.37, 95% CI 0.18-0.76) were also less likely to deliver via scheduled Caesarean compared to women who delivered after 38 weeks' gestation. An interaction term for race and gestational age at delivery was significant in multivariable analysis. Non-Hispanic black (AOR 0.06, 95% CI 0.01-0.36) and Hispanic women (AOR 0.03, 95% CI 0.00-0.59) were more likely to deliver prematurely and less likely to deliver via scheduled C-section compared to non-Hispanic white women. Having a previous Caesarean (AOR 27.77, 95% CI 8.94-86.18) increased the odds of scheduled Caesarean delivery. Only half of deliveries for women with an unknown VL or VL >1,000 copies/ml occurred via scheduled Caesarean. Delivery prior to 38 weeks, particularly among minority women, resulted in a missed opportunity to receive a scheduled Caesarean. However, even when delivering at or after 38 weeks' gestation, a significant proportion of women did not get a scheduled Caesarean when indicated, suggesting a need for focused public health interventions to increase the proportion of women achieving viral suppression during pregnancy and delivering via scheduled Caesarean when indicated.
Llewellyn-Thomas, H; Thiel, E; Paterson, M; Naylor, D
1999-04-01
To elicit patients' maximal acceptable waiting times (MAWT) for non-urgent coronary artery bypass grafting (CABG), and to determine if MAWT is related to prior expectations of waiting times, symptom burden, expected relief, or perceived risks of myocardial infarction while waiting. Seventy-two patients on an elective CABG waiting list chose between two hypothetical but plausible options: a 1-month wait with 2% risk of surgical mortality, and a 6-month wait with 1% risk of surgical mortality. Waiting time in the 6-month option was varied up if respondents chose the 6-month/lower risk option, and down if they chose the 1-month/higher risk option, until the MAWT switch point was reached. Patients also reported their expected waiting time, perceived risks of myocardial infarction while waiting, current function, expected functional improvement and the value of that improvement. Only 17 (24%) patients chose the 6-month/1% risk option, while 55 (76%) chose the 1-month/2% risk option. The median MAWT was 2 months; scores ranged from 1 to 12 months (with two outliers). Many perceived high cumulative risks of myocardial infarction if waiting for 1 (upper quartile, > or = 1.45%) or 6 (upper quartile, > or = 10%) months. However, MAWT scores were related only to expected waiting time (r = 0.47; P < 0.0001). Most patients reject waiting 6 months for elective CABG, even if offered along with a halving in surgical mortality (from 2% to 1%). Intolerance for further delay seems to be determined primarily by patients' attachment to their scheduled surgical dates. Many also have severely inflated perceptions of their risk of myocardial infarction in the queue. These results suggest a need for interventions to modify patients' inaccurate risk perceptions, particularly if a scheduled surgical date must be deferred.
Mathematical Sciences Division 1992 Programs
1992-10-01
statistical theory that underlies modern signal analysis . There is a strong emphasis on stochastic processes and time series , particularly those which...include optimal resource planning and real- time scheduling of stochastic shop-floor processes. Scheduling systems will be developed that can adapt to...make forecasts for the length-of-service time series . Protocol analysis of these sessions will be used to idenify relevant contextual features and to
ERIC Educational Resources Information Center
Ebesutani, Chad; Okamura, Kelsie; Higa-McMillan, Charmaine; Chorpita, Bruce F.
2011-01-01
The current study was the 1st to examine the psychometric properties of the Positive and Negative Affect Schedule for Children-Parent Version (PANAS-C-P) using a large school-based sample of children and adolescents ages 8 to 18 (N = 606). Confirmatory factor analysis supported a 2-factor (correlated) model of positive affect (PA) and negative…
Code of Federal Regulations, 2011 CFR
2011-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... report or annual information form filed or submitted by the issuer with securities regulators of Ontario... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in...
Code of Federal Regulations, 2014 CFR
2014-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... report or annual information form filed or submitted by the issuer with securities regulators of Ontario... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in...
Code of Federal Regulations, 2012 CFR
2012-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... report or annual information form filed or submitted by the issuer with securities regulators of Ontario... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in...
Code of Federal Regulations, 2013 CFR
2013-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... report or annual information form filed or submitted by the issuer with securities regulators of Ontario... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in...
Kerr, D J; Gray, R; McConkey, C; Barnwell, J
2000-08-01
QUASAR is a large trial of adjuvant chemotherapy for colorectal cancer in which clinicians could choose to deliver a standard adjuvant cytotoxic chemotherapy regimen, 5-fluorouracil (5-FU) and L-folinic acid (L-FA), in either a once-weekly or a four-weekly schedule. We report results of a non-randomised comparison between these schedules with respect to survival, recurrence and differential toxicity. In a factorial (2 x 2) trial design, QUASAR compared high-dose (175 mg) versus low-dose (25 mg) L-FA and levamisole versus placebo. The dose of 5-FU was fixed at 370 mg/m2 and although the recommended schedule was i.v. bolus delivery, daily for 5 days repeated four-weekly for 6 months, a significant proportion of randomising clinicians were constrained to deliver once-weekly 5-FU-L-FA for 30 weeks. Four thousand nine hundred twenty-seven patients were entered into QUASAR between May 1994 and October 1997, eighteen hundred twenty-nine of whom have recurred and sixteen hundred eighty-nine died. Similar numbers 2370 vs. 2559 were treated with the once-weekly and four-weekly schedules and the demographic features of the 2 groups were well balanced: stage C, 73.3% once-weekly vs. 71.0% four-weekly; colon, 68.0% vs. 68.3%; high-dose FA, 50.1% vs. 49.9%; levamisole, 49.3% vs. 49.3%; females, 40.2% vs. 41.7%; median age (years) 62 vs. 61. The risk of recurrence and survival were similar regardless of schedule: three-year survival was 70.6% once-weekly vs. 71.0% four-weekly; three-year recurrence risk was 35.6% once-weekly vs. 35.5% four-weekly; But, the once-weekly regimen was much less toxic: number of patients for whom toxicity was reported (once-weekly: four-weekly), stomatitis, 37 vs. 337; diarrhoea, 260 vs. 440; neutropenia, 20 vs. 153. The once-weekly regimen is much less toxic than and, apparently, about as effective as the four-weekly schedule. This suggests that the toxicity of 5-FU-L-FA adjuvant chemotherapy could be reduced substantially by weekly scheduling without compromising efficacy. Alternatively, efficacy might be enhanced with equal toxicity by more dose-intense weekly FU-L-FA regimens. However, this conclusion from a non-randomised comparison needs confirmation in prospective randomised studies.
Use of computerized interview scheduling program for pediatric surgery match applicants.
Stephens, Caroline Q; Hamilton, Nicholas A; Thompson, Ann E; Krishnaswami, Sanjay
2017-06-01
Pediatric surgery fellowship applicants and programs coordinate over 20 interviews per cycle. We hypothesized that replacing e-mail and phone communication with a computerized-scheduling program (CSP) could benefit both parties. We used a CSP to schedule 2016 interviews. Time to schedule and e-mail communication per applicant was compared to 2015, when traditional scheduling was used. Additionally, 2016 interviewees were surveyed about their experience with the CSP vs. traditional means. Analysis was performed using descriptive statistics and a Student's T-test. We found a significant decrease in mean scheduling time from 14.4 to 1.7h (p<0.001) and in e-mails exchanged from 3.4 to 1.0 (p<0.0001). Survey respondents reported 92% satisfaction with the CSP, and 87% found it easier to schedule interviews. Applicants also reported quicker finalization of interview dates (96%), improved access to interview slots (71%), and easier coordination of additional services and time off (63%). Notably, the mean longest time reported to schedule interviews using traditional methods was 7days (range 1-30). Overall, 84% supported widespread adoption of CSPs. Using CSPs improved the scheduling process for the significant majority of interviewees, and our program. If widely adopted, this could greatly improve the efficiency of pediatric surgery interview scheduling. N/A. Copyright © 2017 Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Smith, Stephen F.; Pathak, Dhiraj K.
1991-01-01
In this paper, we report work aimed at applying concepts of constraint-based problem structuring and multi-perspective scheduling to an over-subscribed scheduling problem. Previous research has demonstrated the utility of these concepts as a means for effectively balancing conflicting objectives in constraint-relaxable scheduling problems, and our goal here is to provide evidence of their similar potential in the context of HST observation scheduling. To this end, we define and experimentally assess the performance of two time-bounded heuristic scheduling strategies in balancing the tradeoff between resource setup time minimization and satisfaction of absolute time constraints. The first strategy considered is motivated by dispatch-based manufacturing scheduling research, and employs a problem decomposition that concentrates local search on minimizing resource idle time due to setup activities. The second is motivated by research in opportunistic scheduling and advocates a problem decomposition that focuses attention on the goal activities that have the tightest temporal constraints. Analysis of experimental results gives evidence of differential superiority on the part of each strategy in different problem solving circumstances. A composite strategy based on recognition of characteristics of the current problem solving state is then defined and tested to illustrate the potential benefits of constraint-based problem structuring and multi-perspective scheduling in over-subscribe scheduling problems.
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1992-01-01
The following list of requirements specifies the proposed revisions to the Experiment Scheduling Program (ESP2) which deal with schedule repair. These requirements are divided into those which are general in nature, those which relate to measurement and analysis functions of the software, those which relate specifically to conflict resolution, and those relating directly to the user interface. (This list is not a complete list of requirements for the user interface, but only a list of those schedule repair requirements which relate to the interface.) Some of the requirements relate only to uses of the software in real-time operations. Others are clearly for future versions of the software, beyond the upcoming revision. In either case, the fact will be clearly stated.
Non preemptive soft real time scheduler: High deadline meeting rate on overload
NASA Astrophysics Data System (ADS)
Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed
2015-05-01
While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.
Mozumdar, Biswita C; Hornsby, Douglas Neal; Gogate, Adheet S; Intriere, Lisa A; Hanson, Richard; McGreal, Karen; Kelly, Pauline; Ros, Pablo
2003-08-01
To study end-user attitudes and preferences with respect to radiology scheduling systems and to assess implications for retention and extension of the referral base. A study of the institution's historical data indicated reduced satisfaction with the process of patient scheduling in recent years. Sixty physicians who referred patients to a single, large academic radiology department received the survey. The survey was designed to identify (A) the preferred vehicle for patient scheduling (on-line versus telephone scheduling) and (B) whether ease of scheduling was a factor in physicians referring patients to other providers. Referring physicians were asked to forward the survey to any appropriate office staff member in case the latter scheduled appointments for patients. Users were asked to provide comments and suggestions for improvement. The statistical method used was the analysis of proportions. Thirty-three responses were received, corresponding to a return rate of 55%. Twenty-six of the 33 respondents (78.8%, P < .01) stated they were willing to try an online scheduling system; 16 of which tried the system. Twelve of the 16 (75%, P < .05) preferred the on-line application to the telephone system, stating logistical simplification as the primary reason for preference. Three (18.75%) did not consider online scheduling to be more convenient than traditional telephone scheduling. One respondent did not indicate any preference. Eleven of 33 users (33.33%, P < .001) stated that they would change radiology service providers if expectations of scheduling ease are not met. On-line scheduling applications are becoming the preferred scheduling vehicle. Augmenting their capabilities and availability can simplify the scheduling process, improve referring physician satisfaction, and provide a competitive advantage. Referrers are willing to change providers if scheduling expectations are not met.
Novel Hybrid Scheduling Technique for Sensor Nodes with Mixed Criticality Tasks
Micea, Mihai-Victor; Stangaciu, Cristina-Sorina; Stangaciu, Valentin; Curiac, Daniel-Ioan
2017-01-01
Sensor networks become increasingly a key technology for complex control applications. Their potential use in safety- and time-critical domains has raised the need for task scheduling mechanisms specially adapted to sensor node specific requirements, often materialized in predictable jitter-less execution of tasks characterized by different criticality levels. This paper offers an efficient scheduling solution, named Hybrid Hard Real-Time Scheduling (H2RTS), which combines a static, clock driven method with a dynamic, event driven scheduling technique, in order to provide high execution predictability, while keeping a high node Central Processing Unit (CPU) utilization factor. From the detailed, integrated schedulability analysis of the H2RTS, a set of sufficiency tests are introduced and demonstrated based on the processor demand and linear upper bound metrics. The performance and correct behavior of the proposed hybrid scheduling technique have been extensively evaluated and validated both on a simulator and on a sensor mote equipped with ARM7 microcontroller. PMID:28672856
FASTER - A tool for DSN forecasting and scheduling
NASA Technical Reports Server (NTRS)
Werntz, David; Loyola, Steven; Zendejas, Silvino
1993-01-01
FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling JPL's Deep Space Network (DSN). The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER consists of MS-Windows based programs that replace two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to 'look ahead' at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.
LED traffic signal replacement schedules : facilitating smooth freight flows.
DOT National Transportation Integrated Search
2011-11-01
This research details a field study of LED traffic signals in Missouri and develops a replacement schedule based on key findings. : Rates of degradation were statistically analyzed using Analysis of Variance (ANOVA). Results of this research will pro...
ERIC Educational Resources Information Center
Macari, Suzanne L.; Campbell, Daniel; Gengoux, Grace W.; Saulnier, Celine A.; Klin, Ami J.; Chawarska, Katarzyna
2012-01-01
The study examined whether performance profiles on individual items of the Toddler Module of the Autism Diagnostic Observation Schedule at 12 months are associated with developmental status at 24 months in infants at high and low risk for developing Autism Spectrum Disorder (ASD). A nonparametric decision-tree learning algorithm identified sets of…
van der Molen, Aart J; Reimer, Peter; Dekkers, Ilona A; Bongartz, Georg; Bellin, Marie-France; Bertolotto, Michele; Clement, Olivier; Heinz-Peer, Gertraud; Stacul, Fulvio; Webb, Judith A W; Thomsen, Henrik S
2018-07-01
The Contrast Media Safety Committee (CMSC) of the European Society of Urogenital Radiology (ESUR) has updated its 2011 guidelines on the prevention of post-contrast acute kidney injury (PC-AKI). The results of the literature review and the recommendations based on it, which were used to prepare the new guidelines, are presented in two papers. AREAS COVERED IN PART 2: Topics reviewed include stratification of PC-AKI risk, the need to withdraw nephrotoxic medication, PC-AKI prophylaxis with hydration or drugs, the use of metformin in diabetic patients receiving contrast medium and the need to alter dialysis schedules in patients receiving contrast medium. • In CKD, hydration reduces the PC-AKI risk • Intravenous normal saline and intravenous sodium bicarbonate provide equally effective prophylaxis • No drugs have been consistently shown to reduce the risk of PC-AKI • Stop metformin from the time of contrast medium administration if eGFR < 30 ml/min/1.73 m 2 • Dialysis schedules need not change when intravascular contrast medium is given.
The effects of shift work on free-living physical activity and sedentary behavior.
Loprinzi, Paul D
2015-07-01
Although occupation may influence physical activity and shift work schedule may influence cardiovascular disease risk factors, our understanding of the effects of shift work schedule on overall physical activity behavior and sedentary behavior is limited. Data from the 2005-2006 National Health and Nutrition Examination Survey were used. Shift work schedule was defined as regular daytime shift, evening, night, rotating or another schedule. Physical activity and sedentary behavior were assessed via accelerometry. 1536 adult participants (≥20years) indicated they currently work and provided data on all study variables. After adjustments, and compared to adults working a regular daytime shift, those working an evening (RR=0.41, p=0.001) and night (RR=0.30, p=0.001) shift, respectively, engaged in 59% and 70% less sustained (bouts) moderate-to-vigorous physical activity, but no differences occurred for overall moderate-to-vigorous physical activity. After adjustments, and compared to those working a regular daytime shift, those working a rotating shift engaged in more light-intensity physical activity (overall: β=26.3min/day; p=0.03; bouts: β=37.5, p=0.01) and less sedentary behavior (β=-28.5min/day, p=0.01). Shift work schedule differentially influences physical activity and sedentary behavior. Physical activity and sedentary intervention strategies may need to be tailored based on shift work schedule. Copyright © 2015 Elsevier Inc. All rights reserved.
Lamis, Dorian A.; Malone, Patrick S.; Langhinrichsen-Rohling, Jennifer; Ellis, Thomas E.
2009-01-01
This study examined the relationships among three risk factors – body investment, depression, and alcohol use – and suicide proneness as measured by the Life Attitudes Schedule – Short Form (LAS-SF) in college students (n = 318). Path analysis was used to construct a causal model of suicide proneness. The Body Investment Scale (BIS) subscales were assumed to be causally prior to depression, which was in turn modeled as occurring prior to alcohol use, which was in turn modeled as prior to suicide proneness. Results revealed that, as expected suicide proneness was positively predicted by alcohol use, alcohol use was positively predicted by depression, and depression was negatively predicted by the body image component of the BIS. Additionally, the body image-suicide proneness link was significantly mediated by depression and its direct effect on suicide proneness as well as by the two-mediator path of body image on depression on drinking on suicide proneness. Implications are offered for the improved identification and treatment of young adults at risk for suicidal and health-diminishing behaviors. PMID:20573605
A perspective on the Human-Rating process of US spacecraft: Both past and present
NASA Astrophysics Data System (ADS)
Zupp, George
1995-04-01
The purpose of this report is to characterize the process of Human-Rating as employed by NASA for human spaceflight. An Agency-wide committee was formed in November 1992 to develop a Human-Rating Requirements Definition for Launch Vehicles based on conventional (historical) methods. The committee members were from NASA Headquarters, Marshall Space Flight Center, Kennedy Space Center, Stennis Space Center, and Johnson Space Center. After considerable discussion and analysis, committee members concluded that Human-Rating is the process of satisfying the mutual constraints of cost, schedule, mission performance, and risk while addressing the requirements for human safety, human performance, and human health management and care.
A perspective on the Human-Rating process of US spacecraft: Both past and present
NASA Technical Reports Server (NTRS)
Zupp, George (Editor)
1995-01-01
The purpose of this report is to characterize the process of Human-Rating as employed by NASA for human spaceflight. An Agency-wide committee was formed in November 1992 to develop a Human-Rating Requirements Definition for Launch Vehicles based on conventional (historical) methods. The committee members were from NASA Headquarters, Marshall Space Flight Center, Kennedy Space Center, Stennis Space Center, and Johnson Space Center. After considerable discussion and analysis, committee members concluded that Human-Rating is the process of satisfying the mutual constraints of cost, schedule, mission performance, and risk while addressing the requirements for human safety, human performance, and human health management and care.
NASA Technical Reports Server (NTRS)
Golias, Mihalis M.
2011-01-01
Berth scheduling is a critical function at marine container terminals and determining the best berth schedule depends on several factors including the type and function of the port, size of the port, location, nearby competition, and type of contractual agreement between the terminal and the carriers. In this paper we formulate the berth scheduling problem as a bi-objective mixed-integer problem with the objective to maximize customer satisfaction and reliability of the berth schedule under the assumption that vessel handling times are stochastic parameters following a discrete and known probability distribution. A combination of an exact algorithm, a Genetic Algorithms based heuristic and a simulation post-Pareto analysis is proposed as the solution approach to the resulting problem. Based on a number of experiments it is concluded that the proposed berth scheduling policy outperforms the berth scheduling policy where reliability is not considered.
Laprise, Jean-François; Markowitz, Lauri E; Chesson, Harrell W; Drolet, Mélanie; Brisson, Marc
2016-09-01
A recent clinical trial using the 9-valent human papillomavirus virus (HPV) vaccine has shown that antibody responses after 2 doses are noninferior to those after 3 doses, suggesting that 2 and 3 doses may have comparable vaccine efficacy. We used an individual-based transmission-dynamic model to compare the population-level effectiveness and cost-effectiveness of 2- and 3-dose schedules of 9-valent HPV vaccine in the United States. Our model predicts that if 2 doses of 9-valent vaccine protect for ≥20 years, the additional benefits of a 3-dose schedule are small as compared to those of 2-dose schedules, and 2-dose schedules are likely much more cost-efficient than 3-dose schedules. © The Author 2016. Published by Oxford University Press for the Infectious Diseases Society of America. All rights reserved. For permissions, e-mail journals.permissions@oup.com.
Fisher, Wayne W; Greer, Brian D; Fuhrman, Ashley M; Querim, Angie C
2015-12-01
Multiple schedules with signaled periods of reinforcement and extinction have been used to thin reinforcement schedules during functional communication training (FCT) to make the intervention more practical for parents and teachers. We evaluated whether these signals would also facilitate rapid transfer of treatment effects across settings and therapists. With 2 children, we conducted FCT in the context of mixed (baseline) and multiple (treatment) schedules introduced across settings or therapists using a multiple baseline design. Results indicated that when the multiple schedules were introduced, the functional communication response came under rapid discriminative control, and problem behavior remained at near-zero rates. We extended these findings with another individual by using a more traditional baseline in which problem behavior produced reinforcement. Results replicated those of the previous participants and showed rapid reductions in problem behavior when multiple schedules were implemented across settings. © Society for the Experimental Analysis of Behavior.
Automated Planning and Scheduling for Space Mission Operations
NASA Technical Reports Server (NTRS)
Chien, Steve; Jonsson, Ari; Knight, Russell
2005-01-01
Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.
Schedule Analysis Software Saves Time for Project Planners
NASA Technical Reports Server (NTRS)
2015-01-01
Since the early 2000s, a resource management team at Marshall Space Flight Center has developed and improved the Schedule Test and Assessment Tool, a software add-on capable of analyzing, summarizing, and finding logic gaps in project schedules. Companies like Lanham, Maryland-based Vantage Systems Inc. use the tool to manage NASA projects, but it has also been released for free to more than 200 US companies, agencies, and other entities.
2012-09-01
scheduler to adapt its uplink and downlink assignments to channel conditions. Sleep mode is used by the MS to minimize power drain and radio...is addressed in one resource unit, while for multi-user (MU) schemes , multiple users can be scheduled in one resource unit. Open-loop techniques...17 7. Mobility and Power Management ......................................... 18 8. Scheduling Services
DORCA computer program. Volume 1: User's guide
NASA Technical Reports Server (NTRS)
Wray, S. T., Jr.
1971-01-01
The Dynamic Operational Requirements and Cost Analysis Program (DORCA) was written to provide a top level analysis tool for NASA. DORCA relies on a man-machine interaction to optimize results based on external criteria. DORCA relies heavily on outside sources to provide cost information and vehicle performance parameters as the program does not determine these quantities but rather uses them. Given data describing missions, vehicles, payloads, containers, space facilities, schedules, cost values and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules and cost summaries. The program is designed to consider the Earth Orbit, Lunar, Interplanetary and Automated Satellite Programs. A general outline of the capabilities of the program are provided.
Comprehensive, Quantitative Risk Assessment of CO{sub 2} Geologic Sequestration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lepinski, James
2013-09-30
A Quantitative Failure Modes and Effects Analysis (QFMEA) was developed to conduct comprehensive, quantitative risk assessments on CO{sub 2} capture, transportation, and sequestration or use in deep saline aquifers, enhanced oil recovery operations, or enhanced coal bed methane operations. The model identifies and characterizes potential risks; identifies the likely failure modes, causes, effects and methods of detection; lists possible risk prevention and risk mitigation steps; estimates potential damage recovery costs, mitigation costs and costs savings resulting from mitigation; and ranks (prioritizes) risks according to the probability of failure, the severity of failure, the difficulty of early failure detection and themore » potential for fatalities. The QFMEA model generates the necessary information needed for effective project risk management. Diverse project information can be integrated into a concise, common format that allows comprehensive, quantitative analysis, by a cross-functional team of experts, to determine: What can possibly go wrong? How much will damage recovery cost? How can it be prevented or mitigated? What is the cost savings or benefit of prevention or mitigation? Which risks should be given highest priority for resolution? The QFMEA model can be tailored to specific projects and is applicable to new projects as well as mature projects. The model can be revised and updated as new information comes available. It accepts input from multiple sources, such as literature searches, site characterization, field data, computer simulations, analogues, process influence diagrams, probability density functions, financial analysis models, cost factors, and heuristic best practices manuals, and converts the information into a standardized format in an Excel spreadsheet. Process influence diagrams, geologic models, financial models, cost factors and an insurance schedule were developed to support the QFMEA model. Comprehensive, quantitative risk assessments were conducted on three (3) sites using the QFMEA model: (1) SACROC Northern Platform CO{sub 2}-EOR Site in the Permian Basin, Scurry County, TX, (2) Pump Canyon CO{sub 2}-ECBM Site in the San Juan Basin, San Juan County, NM, and (3) Farnsworth Unit CO{sub 2}-EOR Site in the Anadarko Basin, Ochiltree County, TX. The sites were sufficiently different from each other to test the robustness of the QFMEA model.« less
Health risks and precautions for visitors to the Tokyo 2020 Olympic and Paralympic Games.
Nakamura, Sachiko; Wada, Koji; Yanagisawa, Naoki; Smith, Derek R
In 2020, Japan will host the Tokyo Olympic and Paralympic Games in 2020 (Tokyo 2020) which will involve a large population influx from various countries to Tokyo, the most populated city in Japan. We summarize the potential health risks for visitors to Tokyo 2020, related to communicable disease risks and other health threats, based on recent national and local surveillance reports. We reviewed up-to-date surveillance reports published by the National Institute of Infectious Diseases and Tokyo Metropolitan Infectious Disease Surveillance Center. Communicable disease risks for vaccine-preventable illnesses such as measles and rubella, as well as food and waterborne diseases represent the most likely risks. The risk of acquiring vector-borne diseases is considered low in Japan. On the other hand, however, heat-related illness represents a potential risk, as Tokyo 2020 is scheduled during the hottest season in Japan, with temperatures generally expected to exceed 30 °C. Maintaining an up-to-date routine vaccination schedule is highly recommended for visitors attending the Tokyo 2020 and appropriate hygiene measures for food and waterborne diseases as well as health promotion for heat-related illness. It may also be useful to increase the number of multilingual triage clinicians whom can be placed within emergency departments during the Tokyo 2020 to provide first contact services and coordination of emergency care among non-Japanese speaking visitors to Tokyo. Copyright © 2018. Published by Elsevier Ltd.
Celiac Disease and Increased Risk of Pneumococcal Infection: A Systematic Review and Meta-Analysis.
Simons, Malorie; Scott-Sheldon, Lori A J; Risech-Neyman, Yesenia; Moss, Steven F; Ludvigsson, Jonas F; Green, Peter H R
2018-01-01
Celiac disease has been associated with hyposplenism, and multiple case reports link celiac disease and pneumococcal infections; however, increased risk of pneumococcal infection in celiac disease has not been confirmed. The purpose of this study was to conduct a systematic review to determine the risk of pneumococcal infections in celiac disease. Relevant studies were identified using electronic bibliographic searches of PubMed, OVID, Medline, and EMBASE (1980 to February 2017) and reviewing abstracts from major conferences in gastroenterology. Using number of events in celiac patients and referent patients, we calculated a summary relative risk of pneumococcal infections. All analyses were conducted in Comprehensive Meta-Analysis software using random-effects assumptions. Of a total of 156 articles, 3, representing 3 large databases (the Swedish National Inpatient Register; the Oxford Record Linkage Study; and the English National Hospital Episode Statistics) were included. Each compared patients with celiac disease and confirmed pneumococcal infection to a specific reference group: inpatients and/or the general population. Overall, the odds of pneumococcal infection were higher among hospitalized celiac patients compared with controls (odds ratio 1.66; 95% confidence interval 1.43-1.92). There was no evidence of heterogeneity (Q[1] = 1.17, P = .56, I 2 = 0%). Celiac disease is associated with an increased risk of pneumococcal infection. Preventive pneumococcal vaccination should be considered for those with celiac disease, with special attention to those aged 15-64 years who have not received the scheduled pneumococcal vaccination series as a child. Copyright © 2018 Elsevier Inc. All rights reserved.
Automating Mid- and Long-Range Scheduling for NASA's Deep Space Network
NASA Technical Reports Server (NTRS)
Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Sorensen, Sugi; Tay, Peter; Carruth, Butch; Coffman, Adam; Wallace, Mike
2012-01-01
NASA has recently deployed a new mid-range scheduling system for the antennas of the Deep Space Network (DSN), called Service Scheduling Software, or S(sup 3). This system is architected as a modern web application containing a central scheduling database integrated with a collaborative environment, exploiting the same technologies as social web applications but applied to a space operations context. This is highly relevant to the DSN domain since the network schedule of operations is developed in a peer-to-peer negotiation process among all users who utilize the DSN (representing 37 projects including international partners and ground-based science and calibration users). The initial implementation of S(sup 3) is complete and the system has been operational since July 2011. S(sup 3) has been used for negotiating schedules since April 2011, including the baseline schedules for three launching missions in late 2011. S(sup 3) supports a distributed scheduling model, in which changes can potentially be made by multiple users based on multiple schedule "workspaces" or versions of the schedule. This has led to several challenges in the design of the scheduling database, and of a change proposal workflow that allows users to concur with or to reject proposed schedule changes, and then counter-propose with alternative or additional suggested changes. This paper describes some key aspects of the S(sup 3) system and lessons learned from its operational deployment to date, focusing on the challenges of multi-user collaborative scheduling in a practical and mission-critical setting. We will also describe the ongoing project to extend S(sup 3) to encompass long-range planning, downtime analysis, and forecasting, as the next step in developing a single integrated DSN scheduling tool suite to cover all time ranges.
An Analysis of Mission Critical Computer Software in Naval Aviation
1991-03-01
No. Task No. Work Unit Accesion Number 11. TITLE (Include Security Classification) AN ANALYSIS OF MISSION CRITICAL COMPUTER SOFTWARE IN NAVAL AVIATION...software development schedules were sustained without a milestone change being made. Also, software that was released to the fleet had no major...fleet contain any major defects? This research has revealed that only about half of the original software development schedules were sustained without a
Periodically-Scheduled Controller Analysis using Hybrid Systems Reachability and Continuization
2015-12-01
tools to verify specifications for hybrid automata do not perform well on such periodically scheduled models. This is due to a combination of the large...an additive nondeterministic input. Reachability tools for hybrid automata can better handle such systems. We further improve the analysis by...formally as a hybrid automaton. However, reachability tools to verify specifications for hybrid automata do not perform well on such periodically
Code of Federal Regulations, 2014 CFR
2014-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in... exemption from Rule 10b-13, the predecessor to Rule 14e-5.] Part I—Information Required To Be Sent to...
Code of Federal Regulations, 2012 CFR
2012-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in... exemption from Rule 10b-13, the predecessor to Rule 14e-5.] Part I—Information Required To Be Sent to...
Code of Federal Regulations, 2011 CFR
2011-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in... exemption from Rule 10b-13, the predecessor to Rule 14e-5.] Part I—Information Required To Be Sent to...
Code of Federal Regulations, 2013 CFR
2013-04-01
... the Office of EDGAR and Information Analysis at (202) 551-3610. (2) If filing the Schedule in paper... Data Gathering, Analysis, and Retrieval (EDGAR) system in accordance with the EDGAR rules set forth in... exemption from Rule 10b-13, the predecessor to Rule 14e-5.] Part I—Information Required To Be Sent to...
Morita, Yuko; Sasai-Sakuma, Taeko; Asaoka, Shoichi; Inoue, Yuichi
2015-10-15
This study investigated the prevalence and risk factors of insufficient sleep syndrome (ISS), and factors associated with daytime dysfunction in the disorder in Japanese young adults. In this cross-sectional study, a web-based questionnaire survey was used to assess demographic variables, sleep habits and quality, depressive symptoms, and health-related quality of life (HRQOL) in 2,276 participants aged 20-25. Eleven percent of participants were classified as having ISS. Multiple logistic regression analysis revealed that the presence of ISS was significantly associated with social status (student or full-time employee). The participants with ISS had significantly higher depression scores and lower mental component summary scores than healthy sleepers. In the participants with ISS, a delayed sleep-wake schedule was extracted as a factor associated with worse mental component summary. Results indicate a relatively high proportion of Japanese young adults suffer from ISS, and that the condition is associated with a social status of student or full-time employee. Moreover, a delayed sleep-wake schedule may lead to further deterioration of mental HRQOL in ISS-affected persons. © 2015 American Academy of Sleep Medicine.
Operating room scheduling using hybrid clustering priority rule and genetic algorithm
NASA Astrophysics Data System (ADS)
Santoso, Linda Wahyuni; Sinawan, Aisyah Ashrinawati; Wijaya, Andi Rahadiyan; Sudiarso, Andi; Masruroh, Nur Aini; Herliansyah, Muhammad Kusumawan
2017-11-01
Operating room is a bottleneck resource in most hospitals so that operating room scheduling system will influence the whole performance of the hospitals. This research develops a mathematical model of operating room scheduling for elective patients which considers patient priority with limit number of surgeons, operating rooms, and nurse team. Clustering analysis was conducted to the data of surgery durations using hierarchical and non-hierarchical methods. The priority rule of each resulting cluster was determined using Shortest Processing Time method. Genetic Algorithm was used to generate daily operating room schedule which resulted in the lowest values of patient waiting time and nurse overtime. The computational results show that this proposed model reduced patient waiting time by approximately 32.22% and nurse overtime by approximately 32.74% when compared to actual schedule.
Life expectancy evaluation and development of a replacement schedule for LED traffic signals.
DOT National Transportation Integrated Search
2011-03-01
This research details a field study of LED traffic signals in Missouri and develops a replacement schedule : based on key findings. Rates of degradation were statistically analyzed using Analysis of Variance : (ANOVA). Results of this research will p...
A method for scenario-based risk assessment for robust aerospace systems
NASA Astrophysics Data System (ADS)
Thomas, Victoria Katherine
In years past, aircraft conceptual design centered around creating a feasible aircraft that could be built and could fly the required missions. More recently, aircraft viability entered into conceptual design, allowing that the product's potential to be profitable should also be examined early in the design process. While examining an aerospace system's feasibility and viability early in the design process is extremely important, it is also important to examine system risk. In traditional aerospace systems risk analysis, risk is examined from the perspective of performance, schedule, and cost. Recently, safety and reliability analysis have been brought forward in the design process to also be examined during late conceptual and early preliminary design. While these analyses work as designed, existing risk analysis methods and techniques are not designed to examine an aerospace system's external operating environment and the risks present there. A new method has been developed here to examine, during the early part of concept design, the risk associated with not meeting assumptions about the system's external operating environment. The risks are examined in five categories: employment, culture, government and politics, economics, and technology. The risks are examined over a long time-period, up to the system's entire life cycle. The method consists of eight steps over three focus areas. The first focus area is Problem Setup. During problem setup, the problem is defined and understood to the best of the decision maker's ability. There are four steps in this area, in the following order: Establish the Need, Scenario Development, Identify Solution Alternatives, and Uncertainty and Risk Identification. There is significant iteration between steps two through four. Focus area two is Modeling and Simulation. In this area the solution alternatives and risks are modeled, and a numerical value for risk is calculated. A risk mitigation model is also created. The four steps involved in completing the modeling and simulation are: Alternative Solution Modeling, Uncertainty Quantification, Risk Assessment, and Risk Mitigation. Focus area three consists of Decision Support. In this area a decision support interface is created that allows for game playing between solution alternatives and risk mitigation. A multi-attribute decision making process is also implemented to aid in decision making. A demonstration problem inspired by Airbus' mid 1980s decision to break into the widebody long-range market was developed to illustrate the use of this method. The results showed that the method is able to capture additional types of risk than previous analysis methods, particularly at the early stages of aircraft design. It was also shown that the method can be used to help create a system that is robust to external environmental factors. The addition of an external environment risk analysis in the early stages of conceptual design can add another dimension to the analysis of feasibility and viability. The ability to take risk into account during the early stages of the design process can allow for the elimination of potentially feasible and viable but too-risky alternatives. The addition of a scenario-based analysis instead of a traditional probabilistic analysis enabled uncertainty to be effectively bound and examined over a variety of potential futures instead of only a single future. There is also potential for a product to be groomed for a specific future that one believes is likely to happen, or for a product to be steered during design as the future unfolds.
Design tool for multiprocessor scheduling and evaluation of iterative dataflow algorithms
NASA Technical Reports Server (NTRS)
Jones, Robert L., III
1995-01-01
A graph-theoretic design process and software tool is defined for selecting a multiprocessing scheduling solution for a class of computational problems. The problems of interest are those that can be described with a dataflow graph and are intended to be executed repetitively on a set of identical processors. Typical applications include signal processing and control law problems. Graph-search algorithms and analysis techniques are introduced and shown to effectively determine performance bounds, scheduling constraints, and resource requirements. The software tool applies the design process to a given problem and includes performance optimization through the inclusion of additional precedence constraints among the schedulable tasks.