Sample records for separate doe contract

  1. 48 CFR 923.903 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENVIRONMENT, CONSERVATION, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Contractor Compliance With Environmental Management Systems § 923.903 Contract clause. The FAR Environmental Management Systems clause at.... Some DOE sites have a single Environmental Management System for the site while others have separate...

  2. 17 CFR 230.151 - Safe harbor definition of certain “annuity contracts or optional annuity contracts” within the...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the contract does not vary according to the investment experience of a separate account; (2) The insurer for the life of the contract (i) Guarantees the principal amount of purchase payments and interest... section to net purchase payments and interest credited thereto; and (3) The insurer guarantees that the...

  3. A Business Case for Home Performance Contracting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baechler, Michael C.; Antonopoulos, Chrissi A.; Sevigny, Maureen

    This report was prepared by PNNL for the DOE Building America program. The report provides information for businesses considering entering the home performance contracting industry. Metrics discussed include industry trends and drivers, specific points of entry, business models, startup costs, and marketing strategies. The report includes detailed analysis of eight businesses around the country that have successfully entered the home performance contracting industry. Data is provided on their financial structures, program participation, marketing efforts, and staff training. This report will be distributed via the DOE Building America website, www.buildingamerica.gov. Individual case studies will also be cleared separately.

  4. 17 CFR 230.151A - Certain contracts not “annuity contracts” or “optional annuity contracts” under section 3(a)(8).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... economic, actuarial, and other assumptions used in the determination are reasonable; (ii) The computations...) Separate accounts. This section does not apply to any contract whose value varies according to the..., Jan. 16, 2009, § 230.151A was added, effective Jan. 12, 2011. ...

  5. The Causes and Costs of Modifications to Military Construction Contracts.

    DTIC Science & Technology

    1986-06-06

    issue of contract modifications in federal construction. The first was written by Henry J. Turowski at the Naval Postgraduate 3chool in Monterrey and...Postgraduate School, Monterrey , December 1980). 12. Henry J. Rowland, "The Causes and Effects of Change Orders on the Construction Process", (Master’s thesis...The creation of a separate review cell does not imply completely divorcing review from design. These functions are closely intertwined. The review

  6. 76 FR 25565 - Defense Federal Acquisition Regulations Supplement; Guidance on Personal Services (DFARS Case...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... program manager, or equivalent, certification that the service contract requirement does not include an... a boundary separating contractor and government employees in all workplace environments.'' Response... potential economic, environmental, public health and safety effects, distributive impacts, and equity...

  7. 41 CFR 302-12.103 - May we separately contract for each type of relocation service?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contract for each type of relocation service? 302-12.103 Section 302-12.103 Public Contracts and Property... A RELOCATION SERVICES COMPANY Agency's Use of a Relocation Services Company § 302-12.103 May we separately contract for each type of relocation service? Yes, you may separately contract for each type of...

  8. Advanced physical fine coal cleaning: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-12-01

    The contract objective was to demonstrate Advanced Energy Dynamics, Inc., (AED) Ultrafine Coal (UFC) electrostatic physical fine coal cleaning process as capable of: producing clean coal products of no greater than 2% ash; significantly reducing the pyritic sulfur content below that achievable with state-of-the-art coal cleaning; recovering over 80% of the available energy content in the run-of-mine coal; producing product and refuse with surface moisture below 30%. Originally the demonstration was to be of a Charger/Disc System at the Electric Power Research Institute (EPRI) Coal Quality Development Center (CQDC) at Homer City, Pennsylvania. As a result of the combination ofmore » Charger/Disc System scale-up problems and parallel development of an improved Vertical-Belt Separator, DOE issued a contract modification to perform additional laboratory testing and optimization of the UFC Vertical-Belt Separator System at AED. These comparative test results, safety analyses and an economic analysis are discussed in this report. 29 refs., 25 figs., 41 tabs.« less

  9. Sodium sulfur electric vehicle battery engineering program final report, September 2, 1986--June 15, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1993-06-01

    In September 1986 a contract was signed between Chloride Silent Power Limited (CSPL) and Sandia National Laboratories (SNL) entitled ``Sodium Sulfur Electric Vehicle Battery Engineering Program``. The aim of the cost shared program was to advance the state of the art of sodium sulfur batteries for electric vehicle propulsion. Initially, the work statement was non-specific in regard to the vehicle to be used as the design and test platform. Under a separate contract with the DOE, Ford Motor Company was designing an advanced electric vehicle drive system. This program, called the ETX II, used a modified Aerostar van for itsmore » platform. In 1987, the ETX II vehicle was adopted for the purposes of this contract. This report details the development and testing of a series of battery designs and concepts which led to the testing, in the US, of three substantial battery deliverables.« less

  10. 48 CFR 970.1504-1-2 - Fee policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to other performance requirements specified in the contract, DOE management and operating contractors... approved Integrated Safety Management System (ISMS), or similar document. As applicable, performance... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-2 Fee policy. (a) DOE...

  11. 20 CFR 30.212 - How does a claimant establish that the employee contracted cancer after beginning employment at a...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer... Cancer Under Parts B and E of Eeoicpa § 30.212 How does a claimant establish that the employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer facility or a RECA...

  12. 20 CFR 30.212 - How does a claimant establish that the employee contracted cancer after beginning employment at a...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer... Cancer Under Parts B and E of Eeoicpa § 30.212 How does a claimant establish that the employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer facility or a RECA...

  13. 20 CFR 30.212 - How does a claimant establish that the employee contracted cancer after beginning employment at a...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer... Cancer Under Parts B and E of Eeoicpa § 30.212 How does a claimant establish that the employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer facility or a RECA...

  14. 20 CFR 30.212 - How does a claimant establish that the employee contracted cancer after beginning employment at a...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer... Cancer Under Parts B and E of Eeoicpa § 30.212 How does a claimant establish that the employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer facility or a RECA...

  15. 20 CFR 30.212 - How does a claimant establish that the employee contracted cancer after beginning employment at a...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer... Cancer Under Parts B and E of Eeoicpa § 30.212 How does a claimant establish that the employee contracted cancer after beginning employment at a DOE facility, an atomic weapons employer facility or a RECA...

  16. 48 CFR 970.5223-5 - DOE motor vehicle fleet fuel efficiency.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and Contract Clauses for Management and Operating Contracts 970.5223-5 DOE motor vehicle fleet fuel..., insert the following clause in contracts providing for Contractor management of the motor vehicle fleet... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOE motor vehicle fleet...

  17. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  18. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  19. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  20. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  1. 48 CFR 970.1504-2 - Price negotiation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Price negotiation. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-2 Price negotiation. (a) Management and operating contract prices (fee) and DOE obligations to support contract...

  2. 48 CFR 917.7000 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 917.7000 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Cost Participation 917.7000 Scope of subpart. (a) This subpart.../or demonstration projects under DOE prime contracts. This subpart does not cover efforts and projects...

  3. Diaphragm structure and function in the Florida manatee (Trichechus manatus latirostris).

    PubMed

    Rommel, S; Reynolds, J E

    2000-05-01

    Relative to many other mammals, little is known about the functional morphology of the four extant species of the order Sirenia. In this study, 166 Florida manatee (Trichechus manatus latirostris) carcasses fresh enough to collect detailed anatomical information were examined to describe the gross anatomy of the diaphragm. Our results show that the Florida manatee's diaphragm differs from those of other mammals in that it: lies in a dorsal plane, rather than in the more typical transverse plane; is located dorsal to the heart and does not attach to the sternum; and attaches medially at the "I"-shaped central tendon to bony projections extending ventrally from the vertebral bodies, forming two distinct hemidiaphragms. The manatee's transverse septum is a separate structure that lies at a right angle to the diaphragm and separates the heart from the liver and other viscera. The extreme muscularity of the diaphragm and the ability of manatees to adjust their position in the water column with minimal external movement suggest that diaphragmatic contractions may change the volume of each pleural cavity to affect buoyancy, roll, and pitch. We also hypothesize that such contractions, in concert with contractions of powerful abdominal muscles, may compress gas in the massive large intestine, and thereby also contribute to buoyancy control. Copyright 2000 Wiley-Liss, Inc.

  4. 48 CFR 970.3200 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE MANAGEMENT AND OPERATING CONTRACTS Contract Financing 970.3200 Policy. It is the policy of the Department of Energy (DOE) to finance management and operating contracts through advance payments and the use...

  5. 48 CFR 970.5070-3 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Extraordinary Contractual Actions and the..., shall be included in all management and operating contracts involving the risk of public liability for... the contract work, including such events caused by a product delivered to a DOE-owned, facility for...

  6. Hybrid Ultra-Microporous Materials for Selective Xenon Adsorption and Separation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mohamed, Mona H.; Elsaidi, Sameh K.; Pham, Tony

    The demand for Xe/Kr separation continues to grow due to the industrial significance of high-purity Xe gas. Current separation processes rely on energy intensive cryogenic distillation. Therefore, there is a need to develop less energy intensive alternatives such as physisorptive separation using porous materials. Here we show that an underexplored class of porous materials called hybrid ultramicroporous materials (HUMs) based upon inorganic and organic building blocks affords new benchmark selectivity for Xe separation from Xe/Kr mixtures. The isostructural materials, CROFOUR-1-Ni and CROFOUR-2-Ni, are coordination networks that exhibit coordinatively saturated metal centres and two distinct types of micropores, one of whichmore » is lined by CrO 4 2- (CROFOUR) anions and the other is decorated by the functionalized organic linker. These nets offer unprecedented selectivity towards Xe, and also address processing and stability limitations of existing porous materials. Modelling experiments indicate that the extraordinary selectivity of these nets is tailored by synergy between the pore size, which is just above the kinetic diameter of Xe, and the strong electrostatics afforded by the CrO 4 2- anions. Column breakthrough experiments demonstrate the potential of the practical use of these materials in Xe/Kr separation at low concentrations at the levels relevant to Xe capture from air and in nuclear fuel reprocessing. B.S. acknowledges the National Science Foundation (Award No. CHE-1152362), including support from the Major Research Instrumentation Program (Award No CHE-1531590), the computational resources that were made available by a XSEDE Grant (No. TG-DMR090028), and the use of the services provided by Research Computing at the University of South Florida. We (P.K.T) thank the US Department of Energy (DOE), Office of Nuclear Energy for adsorption and breakthrough measurements. We (P.K.T) particularly thank J. Bresee, Kimberly Gray, T. Todd (Idaho National Laboratory), John Vienna (PNNL), B. Jubin (Oak Ridge National Laboratory) and D.M. Strachan (Strachan LLC) for providing programmatic support and guidance. Pacific Northwest National Laboratory is a multi-program national laboratory operated for the US Department of Energy by Battelle Memorial Institute under Contract DE-AC05-76RL01830. M.J.Z. gratefully acknowledges Science Foundation Ireland (Award 13/RP/B2549) for support. This research used Beamline 17-BM of the Advanced Photon Source, a U.S. Department of Energy (DOE) Office of Science User Facility operated for the DOE Office of Science by Argonne National Laboratory under Contract No. DE-AC02-06CH11357.« less

  7. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  8. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  9. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  10. 48 CFR 904.404 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... provision and contract clause. (d) The security clauses to be used in DOE contracts are found at 952.204. They are: (1) Security, 952.204-2. This clause is required in contracts and subcontracts, the... materials or the provision of protective services. DOE utilizes the National Industrial Security Program but...

  11. 48 CFR 915.404-4-70 - DOE structured profit and fee system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOE structured profit and fee system. 915.404-4-70 Section 915.404-4-70 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-4-70...

  12. 13 CFR 126.609 - What must the contracting officer do if a contracting opportunity does not exist for competition...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What must the contracting officer do if a contracting opportunity does not exist for competition among qualified HUBZone SBCs? 126.609 Section 126.609 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contractual...

  13. 41 CFR 102-3.135 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this subpart cover and how does it apply? 102-3.135 Section 102-3.135 Public Contracts and Property Management... this subpart cover and how does it apply? This subpart establishes policies and procedures relating to...

  14. 41 CFR 102-3.5 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this subpart cover and how does it apply? 102-3.5 Section 102-3.5 Public Contracts and Property Management Federal...? § 102-3.5 What does this subpart cover and how does it apply? This subpart provides the policy framework...

  15. 20 CFR 30.211 - How does a claimant establish that the employee has or had contracted cancer?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... employee has or had contracted cancer? 30.211 Section 30.211 Employees' Benefits OFFICE OF WORKERS... Cancer Under Parts B and E of Eeoicpa § 30.211 How does a claimant establish that the employee has or had contracted cancer? A claimant establishes that the employee has or had contracted a specified cancer (as...

  16. 20 CFR 30.211 - How does a claimant establish that the employee has or had contracted cancer?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... employee has or had contracted cancer? 30.211 Section 30.211 Employees' Benefits OFFICE OF WORKERS... Cancer Under Parts B and E of Eeoicpa § 30.211 How does a claimant establish that the employee has or had contracted cancer? A claimant establishes that the employee has or had contracted a specified cancer (as...

  17. 15 CFR 29.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contracts that I receive? 29.115 Section 29.115 Commerce and Foreign Trade Office of the Secretary of... § 29.115 Does this part affect the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as...

  18. 43 CFR 43.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracts that I receive? 43.115 Section 43.115 Public Lands: Interior Office of the Secretary of the... § 43.115 Does this part affect the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as...

  19. 15 CFR 29.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contracts that I receive? 29.115 Section 29.115 Commerce and Foreign Trade Office of the Secretary of... § 29.115 Does this part affect the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as...

  20. 15 CFR 29.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... contracts that I receive? 29.115 Section 29.115 Commerce and Foreign Trade Office of the Secretary of... § 29.115 Does this part affect the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as...

  1. 20 CFR 30.211 - How does a claimant establish that the employee has or had contracted cancer?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... employee has or had contracted cancer? 30.211 Section 30.211 Employees' Benefits OFFICE OF WORKERS... Cancer Under Parts B and E of Eeoicpa § 30.211 How does a claimant establish that the employee has or had contracted cancer? A claimant establishes that the employee has or had contracted a specified cancer (as...

  2. 20 CFR 30.211 - How does a claimant establish that the employee has or had contracted cancer?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... employee has or had contracted cancer? 30.211 Section 30.211 Employees' Benefits OFFICE OF WORKERS... Cancer Under Parts B and E of Eeoicpa § 30.211 How does a claimant establish that the employee has or had contracted cancer? A claimant establishes that the employee has or had contracted a specified cancer (as...

  3. 20 CFR 30.211 - How does a claimant establish that the employee has or had contracted cancer?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... employee has or had contracted cancer? 30.211 Section 30.211 Employees' Benefits OFFICE OF WORKERS... Cancer Under Parts B and E of Eeoicpa § 30.211 How does a claimant establish that the employee has or had contracted cancer? A claimant establishes that the employee has or had contracted a specified cancer (as...

  4. 41 CFR 102-3.90 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this subpart cover and how does it apply? 102-3.90 Section 102-3.90 Public Contracts and Property Management Federal... does it apply? This subpart outlines specific responsibilities and functions to be carried out by the...

  5. 6 Li and d + α scattering in a three-body momentum space Faddeev model (I)

    NASA Astrophysics Data System (ADS)

    Jin, Lei; Hlophe, Linda; Elster, Charlotte; Nogga, Andreas; Nunes, Filomena M.

    2017-09-01

    The (d , p) transfer reaction constitutes an important tool for extracting nuclear structure information such as spectroscopic factors and asymptotic normalization coefficients. In order to treat the dynamics in all reaction channels on the same footing, it is advantageous to view the (d , p) reaction as a three-body problem (n + p + A) within a Faddeev framework. Coulomb poses severe difficulties when studying these reactions on heavy nuclei with momentum space Faddeev equations. One way to address the challenges is to formulate the problem without screening and using separable interactions. An important first step in testing this formulation is to consider the ground state of 6Li, since this system has been studied in detail before within a three-body n + p + α ansatz. For the np interaction, we employ e.g. the CD-Bonn potential, and for n + α and p + α interactions Wood-Saxon type potentials. We introduce a projection method for the Pauli forbidden state which acts only in the relevant subsystem and thus leaves the structure of the Faddeev equations unaltered. Results for the energy and structure of the 6Li ground state will be presented for both the separable and non-separable approaches. Our results demonstrate the accuracy of the separable approach. Supported in part by the U.S. NSF under Contract PHY-1520972 and PHY-1520929, and U.S. DoE under Contract DE-FG02-93ER40756.

  6. 48 CFR 927.303 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is a domestic small business or nonprofit organization as defined at (FAR) 48 CFR 27.301, except... contracts for the management and operation of DOE laboratories and production facilities. (b) DOE shall not... its rights in an identified invention pursuant to 10 CFR part 784, contracting officers shall consult...

  7. 41 CFR 102-3.45 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this subpart cover and how does it apply? 102-3.45 Section 102-3.45 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION GENERAL 3-FEDERAL ADVISORY...

  8. 48 CFR 970.0309-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of... applicability of the DOE Employee Protection Program to management and operating contracts. [65 FR 81009, Dec...

  9. Ultrafast electron diffraction study of ab-plane dynamics in superconducting Bi2Sr<2CaCu2O8+d

    NASA Astrophysics Data System (ADS)

    Konstantinova, Tatiana; Reid, Alexander; Wu, Lijun; Durr, Hermann; Wang, Xijie; Zhu, Yimei

    The role of phonons and other collective modes in cooperative electron phenomena in high-TC cuprate superconductors is an extensively interesting topic. Time-resolved experiments provide temporal hierarchy of the bosonic modes interacting with electrons. However, majority of research in this field explore dynamics of electronic states and can only make indirect conclusion about involvement of the lattice. We report time-resolved study of optimally doped Bi2Sr2CaCu2O8+d lattice response to photo-excitation by means of ultrafast electron diffraction that is directly sensitive to atomic motion. Data analysis utilizing Bloch-wave calculation of diffraction peak intensity allows separation of Cu-O in-plane vibration building up on the sub picosecond time scale from the low energy phonon population growth with a much slower rate. This study confirms the assumption of strong electron coupling to the Cu-O plane phonons. This work was supported by the US DOE, Office of Science, Basic Energy Science, Materials Science and Engineering Division under Contract No: DE-AC02-98CH10886; DOE LDRD funding under contract DE-AC02-76SF00515 and BNL.

  10. 13 CFR 126.603 - Does HUBZone certification guarantee receipt of HUBZone contracts?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Does HUBZone certification guarantee receipt of HUBZone contracts? 126.603 Section 126.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contractual Assistance § 126.603 Does HUBZone certification...

  11. 48 CFR 970.3770-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770-1 Policy. Contractors managing Department of Energy (DOE) facilities shall be required to comply with the DOE Directives applicable to facilities management. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  12. 46 CFR Sec. 3 - General provisions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... thereof or if the contractor does not hold a Master Repair Contract under NSA-WORKSMALREP if the contract price does not exceed $2,000 and said contract is made in accordance with NSA Order 46 (SRM-5, Revised) and NSA Order 51 (SRM-6, Revised). (b) The repairs to or servicing of ships equipment, as covered by...

  13. 46 CFR Sec. 3 - General provisions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... thereof or if the contractor does not hold a Master Repair Contract under NSA-WORKSMALREP if the contract price does not exceed $2,000 and said contract is made in accordance with NSA Order 46 (SRM-5, Revised) and NSA Order 51 (SRM-6, Revised). (b) The repairs to or servicing of ships equipment, as covered by...

  14. 25 CFR 900.189 - Does this coverage extend to subcontractors of self-determination contracts?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Does this coverage extend to subcontractors of self-determination contracts? 900.189 Section 900.189 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR... this coverage extend to subcontractors of self-determination contracts? No. Subcontractors or...

  15. 41 CFR 102-3.180 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... by the National Academy of Sciences or the National Academy of Public Administration? § 102-3.180... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this subpart cover and how does it apply? 102-3.180 Section 102-3.180 Public Contracts and Property Management...

  16. 41 CFR 109-38.502-50 - DOE guidelines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., AND MOTOR VEHICLES 38-MOTOR EQUIPMENT MANAGEMENT 38.5-Scheduled Maintenance § 109-38.502-50 DOE... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false DOE guidelines. 109-38.502-50 Section 109-38.502-50 Public Contracts and Property Management Federal Property Management...

  17. 10 CFR 436.32 - Qualified contractors lists.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Qualified contractors lists. 436.32 Section 436.32 Energy... Procedures for Energy Savings Performance Contracting § 436.32 Qualified contractors lists. (a) DOE shall... energy savings performance contracts. (c) DOE may remove a firm from DOE's list of qualified contractors...

  18. 48 CFR 1436.270-1 - Uniform contract format.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contract format does not apply, the CO should so mark that section in the solicitation. Upon award, the CO... Deliveries or performance. G Contract administration data. H Special contract requirements. Part II—Contract...

  19. 48 CFR 32.005 - Consideration for contract financing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Consideration for contract... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.005 Consideration for contract financing. (a... separate consideration for the contract financing clause. The value of the contract financing to the...

  20. 10 CFR 607.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Does this part affect the Federal contracts that I receive? 607.115 Section 607.115 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 607.115 Does this part...

  1. 22 CFR 133.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... that I receive? 133.115 Section 133.115 Foreign Relations DEPARTMENT OF STATE MISCELLANEOUS GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 133.115 Does... § 133. 510(c). However, this part does not apply directly to procurement contracts. The portion of the...

  2. 48 CFR 970.2702-6 - Notice of right to request patent waiver.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970....5227-9 in all solicitations for contracts for the management and operation of DOE sites or facilities. ...

  3. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  4. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  5. 48 CFR 970.3605-1 - Other contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts... management and operating contracts. [65 FR 81009, Dec. 22, 2000, as amended at 74 FR 36374, July 22, 2009] ...

  6. 45 CFR 630.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) NATIONAL SCIENCE FOUNDATION GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 630.115 Does this part affect the Federal contracts that I receive? It will affect...

  7. Fusion Ash Separation in the Princeton Field-Reversed Configuration Reactor

    NASA Astrophysics Data System (ADS)

    Abbate, Joseph; Yeh, Meagan; McGreivy, Nick; Cohen, Samuel

    2016-10-01

    The Princeton Field-Reversed Configuration (PFRC) concept relies on low-neutron production by D-3He fusion to enable small, safe nuclear-fusion reactors to be built, an approach requiring rapid and efficient extraction of fusion ash and energy produced by D-3He fusion reactions. The ash exhaust stream would contain energetic (0.1-1 MeV) protons, T, 3He, and 4He ions and nearly 1e5 cooler (ca. 100 eV) D ions. The T extracted from the reactor would be a valuable fusion product in that it decays into 3He, which could be used as fuel. If the T were not extracted it would be troublesome because of neutron production by the D-T reaction. This paper discusses methods to separate the various species in a PFRC reactor's exhaust stream. First, we discuss the use of curved magnetic fields to separate the energetic from the cool components. Then we discuss exploiting material properties, specifically reflection, sputtering threshold, and permeability, to allow separation of the hydrogen from the helium isotopes. DOE Contract Number DE-AC02-09CH11466.

  8. 26 CFR 1.61-10 - Alimony and separate maintenance payments; annuities; income from life insurance and endowment...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...; annuities; income from life insurance and endowment contracts. 1.61-10 Section 1.61-10 Internal Revenue... separate maintenance payments; annuities; income from life insurance and endowment contracts. (a) In general. Alimony and separate maintenance payments, annuities, and income from life insurance and...

  9. 41 CFR 102-192.25 - Does this part apply to me?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Does this part apply to me? 102-192.25 Section 102-192.25 Public Contracts and Property Management Federal Property... MANAGEMENT Introduction to this Part § 102-192.25 Does this part apply to me? Yes, this part applies to you...

  10. 41 CFR 102-192.25 - Does this part apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Does this part apply to me? 102-192.25 Section 102-192.25 Public Contracts and Property Management Federal Property... MANAGEMENT Introduction to this Part § 102-192.25 Does this part apply to me? Yes, this part applies to you...

  11. 41 CFR 102-192.25 - Does this part apply to me?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Does this part apply to me? 102-192.25 Section 102-192.25 Public Contracts and Property Management Federal Property... MANAGEMENT Introduction to this Part § 102-192.25 Does this part apply to me? Yes, this part applies to you...

  12. 41 CFR 102-192.25 - Does this part apply to me?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does this part apply to me? 102-192.25 Section 102-192.25 Public Contracts and Property Management Federal Property... MANAGEMENT Introduction to this Part § 102-192.25 Does this part apply to me? Yes, this part applies to you...

  13. 41 CFR 102-3.185 - What does this subpart require agencies to do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... National Academy of Sciences or the National Academy of Public Administration? § 102-3.185 What does this... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this subpart require agencies to do? 102-3.185 Section 102-3.185 Public Contracts and Property Management Federal...

  14. 45 CFR 1155.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Does this part affect the Federal contracts that I receive? 1155.115 Section 1155.115 Public Welfare Regulations Relating to Public Welfare (Continued... REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 1155.115 Does this part...

  15. 34 CFR 84.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Does this part affect the Federal contracts that I receive? 84.115 Section 84.115 Education Office of the Secretary, Department of Education GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage § 84.115 Does this part affect...

  16. Active Flow Control in an Aggressive Transonic Diffuser

    NASA Astrophysics Data System (ADS)

    Skinner, Ryan W.; Jansen, Kenneth E.

    2017-11-01

    A diffuser exchanges upstream kinetic energy for higher downstream static pressure by increasing duct cross-sectional area. The resulting stream-wise and span-wise pressure gradients promote extensive separation in many diffuser configurations. The present computational work evaluates active flow control strategies for separation control in an asymmetric, aggressive diffuser of rectangular cross-section at inlet Mach 0.7 and Re 2.19M. Corner suction is used to suppress secondary flows, and steady/unsteady tangential blowing controls separation on both the single ramped face and the opposite flat face. We explore results from both Spalart-Allmaras RANS and DDES turbulence modeling frameworks; the former is found to miss key physics of the flow control mechanisms. Simulated baseline, steady, and unsteady blowing performance is validated against experimental data. Funding was provided by Northrop Grumman Corporation, and this research used resources of the Argonne Leadership Computing Facility, which is a DOE Office of Science User Facility supported under Contract DE-AC02-06CH11357.

  17. 48 CFR 970.1504 - Contract pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  18. 48 CFR 1436.270-1 - Uniform contract format.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract format does not apply, the CO should so mark that section in the solicitation. Upon award, the CO... Deliveries or performance. G Contract administration data. H Special contract requirements. Part IV...

  19. 48 CFR 970.2210 - Service Contract Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Service Contract Act. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2210 Service Contract Act. The Service Contract Act of 1965 is not applicable to contracts for the management and operation of...

  20. 48 CFR 852.207-70 - Report of employment under commercial activities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... are identified for release from their competitive levels or separated as a result of the contract. (2... personnel who were recently released from their competitive levels or separated as a result of the contract...

  1. 48 CFR 970.1100-1 - Performance-based contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1100-1 Performance... practicable, performance-based contracting methods in its management and operating contracts. The Office of...-based contracting concepts and methodologies that may be generally applied to management and operating...

  2. 41 CFR 102-192.30 - What types of mail does this part apply to?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 192-MAIL MANAGEMENT Introduction to this Part § 102-192.30 What types of mail does this part apply to... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What types of mail does this part apply to? 102-192.30 Section 102-192.30 Public Contracts and Property Management Federal...

  3. 41 CFR 105-74.105 - Does this part apply to me?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Does this part apply to me? 105-74.105 Section 105-74.105 Public Contracts and Property Management Federal Property... § 105-74.105 Does this part apply to me? (a) Portions of this part apply to you if you are either— (1) A...

  4. 41 CFR 105-74.105 - Does this part apply to me?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Does this part apply to me? 105-74.105 Section 105-74.105 Public Contracts and Property Management Federal Property... § 105-74.105 Does this part apply to me? (a) Portions of this part apply to you if you are either— (1) A...

  5. 41 CFR 105-74.105 - Does this part apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Does this part apply to me? 105-74.105 Section 105-74.105 Public Contracts and Property Management Federal Property... § 105-74.105 Does this part apply to me? (a) Portions of this part apply to you if you are either— (1) A...

  6. 41 CFR 105-74.105 - Does this part apply to me?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does this part apply to me? 105-74.105 Section 105-74.105 Public Contracts and Property Management Federal Property... § 105-74.105 Does this part apply to me? (a) Portions of this part apply to you if you are either— (1) A...

  7. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false What role does the Secretary play during the performance... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role does the Secretary play during the performance of a self-determination construction contract? (a) If...

  8. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 1 2013-07-01 2013-07-01 false Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  9. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 1 2014-07-01 2013-07-01 true Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  10. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  11. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 1 2012-07-01 2012-07-01 false Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  12. 29 CFR 4.155 - Employee coverage does not depend on form of employment contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Employee coverage does not depend on form of employment... Employee coverage does not depend on form of employment contract. The Act, in section 8(b), makes it plain... contractual relationship that may be alleged to exist between the contractor or subcontractor and such persons...

  13. 20 CFR 670.993 - How does Job Corps ensure that contract disputes will be resolved?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT Administrative and Management Provisions § 670.993 How does Job Corps ensure that contract disputes will be resolved...

  14. 48 CFR 217.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...)(i) Notwithstanding FAR 17.204(e), the ordering period of a task order or delivery order contract...) of this section does not apply to the following: (A) Contracts, including task or delivery order contracts, awarded under other statutory authority. (B) Advisory and assistance service task order contracts...

  15. Graphene Exfoliation at a Ferroelectric Domain Wall Induced by the Piezoelectric Effect: Impact on the Conductance of the Graphene Channel

    NASA Astrophysics Data System (ADS)

    Morozovska, Anna N.; Kurchak, Anatolii I.; Strikha, Maksym V.

    2017-11-01

    p -n junctions in graphene on ferroelectric substrates have been actively studied, but the impact of the piezoelectric effect in ferroelectric substrate with ferroelectric domain walls (FDWs) on graphene characteristics was not considered. Because of the piezoeffect, ferroelectric domain stripes with opposite spontaneous polarizations elongate or contract depending on the polarity of voltage applied to the substrate. We show that the alternating piezoelectric displacement of the ferroelectric domain surfaces can lead to the alternate stretching and separation of graphene areas at the steps between elongated and contracted domains. Graphene separation at FDWs induced by the piezoeffect can cause unusual effects. In particular, the conductance of the graphene channel in a field-effect transistor increases significantly because electrons in the stretched section scatter on acoustic phonons. At the same time, the graphene conductance is determined by ferroelectric spontaneous polarization and varies greatly in the presence of FDWs. The revealed piezomechanism of graphene conductance control is promising for next generations of graphene-based field-effect transistors, modulators, electrical transducers, and piezoresistive elements. Also, our results propose the method of suspended graphene fabrication based on the piezoeffect in a ferroelectric substrate that does not require any additional technological procedures.

  16. Electrical stimulation superimposed onto voluntary muscular contraction.

    PubMed

    Paillard, Thierry; Noé, Frédéric; Passelergue, Philippe; Dupui, Philippe

    2005-01-01

    Electrical stimulation (ES) reverses the order of recruitment of motor units (MU) observed with voluntary muscular contraction (VOL) since under ES, large MU are recruited before small MU. The superimposition of ES onto VOL (superimposed technique: application of an electrical stimulus during a voluntary muscle action) can theoretically activate more motor units than VOL performed alone, which can engender an increase of the contraction force. Two superimposed techniques can be used: (i) the twitch interpolation technique (ITT), which consists of interjecting an electrical stimulus onto the muscle nerve; and (ii) the percutaneous superimposed electrical stimulation technique (PST), where the stimulation is applied to the muscle belly. These two superimposed techniques can be used to evaluate the ability to fully activate a muscle. They can thus be employed to distinguish the central or peripheral nature of fatigue after exhausting exercise. In general, whatever the technique employed, the superimposition of ES onto volitional exercise does not recruit more MU than VOL, except with eccentric actions. Nevertheless, the neuromuscular response associated with the use of the superimposed technique (ITT and PST) depends on the parameter of the superimposed current. The sex and the training level of the subjects can also modify the physiological impact of the superimposed technique. Although the motor control differs drastically between training with ES and VOL, the integration of the superimposed technique in training programmes with healthy subjects does not reveal significant benefits compared with programmes performed only with voluntary exercises. Nevertheless, in a therapeutic context, training programmes using ES superimposition compensate volume and muscle strength deficit with more efficiency than programmes using VOL or ES separately.

  17. 48 CFR 970.0371-9 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal....5203-3, Contractor's Organization, in all management and operating contracts. The approval authority of...

  18. Arctic Energy Technology Development Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sukumar Bandopadhyay; Charles Chamberlin; Robert Chaney

    2008-12-31

    The Arctic Energy Technology Development Laboratory was created by the University of Alaska Fairbanks in response to a congressionally mandated funding opportunity through the U.S. Department of Energy (DOE), specifically to encourage research partnerships between the university, the Alaskan energy industry, and the DOE. The enabling legislation permitted research in a broad variety of topics particularly of interest to Alaska, including providing more efficient and economical electrical power generation in rural villages, as well as research in coal, oil, and gas. The contract was managed as a cooperative research agreement, with active project monitoring and management from the DOE. Inmore » the eight years of this partnership, approximately 30 projects were funded and completed. These projects, which were selected using an industry panel of Alaskan energy industry engineers and managers, cover a wide range of topics, such as diesel engine efficiency, fuel cells, coal combustion, methane gas hydrates, heavy oil recovery, and water issues associated with ice road construction in the oil fields of the North Slope. Each project was managed as a separate DOE contract, and the final technical report for each completed project is included with this final report. The intent of this process was to address the energy research needs of Alaska and to develop research capability at the university. As such, the intent from the beginning of this process was to encourage development of partnerships and skills that would permit a transition to direct competitive funding opportunities managed from funding sources. This project has succeeded at both the individual project level and at the institutional development level, as many of the researchers at the university are currently submitting proposals to funding agencies, with some success.« less

  19. 48 CFR 970.5200 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management... provisions and contract clauses for use in management and operating contracts. The provisions and clauses... prescription, are to be used in addition to or in place of such clauses. Management and operating contracts are...

  20. 48 CFR 970.1504-1-4 - Types of contracts and fee arrangements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-based management contract, those contract types which incentivize performance and cost control are... performance result or outcome. (e) Because the nature and complexity of the work performed under a management... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970...

  1. 48 CFR 970.1706 - Management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Management and operating contracts. 970.1706 Section 970.1706 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1706 Management and operating contracts...

  2. 41 CFR 102-2.115 - What kinds of non-regulatory material does GSA publish outside of the FMR?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What kinds of non-regulatory material does GSA publish outside of the FMR? 102-2.115 Section 102-2.115 Public Contracts and....115 What kinds of non-regulatory material does GSA publish outside of the FMR? As GSA converts the...

  3. 48 CFR 970.5227-9 - Notice of right to request patent waiver.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5227-9 Notice of right to request patent waiver... contract, in advance of or within 30 days after the effective date of contracting. If such advance waiver...

  4. 48 CFR 970.5227-9 - Notice of right to request patent waiver.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5227-9 Notice of right to request patent waiver... contract, in advance of or within 30 days after the effective date of contracting. If such advance waiver...

  5. 48 CFR 52.228-15 - Performance and Payment Bonds-Construction.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Definitions. As used in this clause— Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include...

  6. 48 CFR 970.2704-3 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2704-3 Contract clauses. (a) The contracting officer shall insert the clause at 48 CFR 970.5227-1, Rights in Data—Facilities, in management and operating contracts which do not contain the clause at 48 CFR 970.5227-2...

  7. Results from MARBLE DT Experiments on the National Ignition Facility: Implosion of Foam-Filled Capsules for Studying Thermonuclear Burn in the Presence of Heterogeneous Mix

    NASA Astrophysics Data System (ADS)

    Murphy, T. J.; Douglas, M. R.; Cardenas, T.; Cooley, J. H.; Gunderson, M. A.; Haines, B. M.; Hamilton, C. E.; Kim, Y.; Lee, M. N.; Oertel, J. A.; Olson, R. E.; Randolph, R. B.; Shah, R. C.; Smidt, J. M.

    2017-10-01

    The MARBLE campaign on NIF investigates the effect of heterogeneous mix on thermonuclear burn for comparison to a probability distribution function (PDF) burn model. MARBLE utilizes plastic capsules filled with deuterated plastic foam and tritium gas. The ratio of DT to DD neutron yield is indicative of the degree to which the foam and the gas atomically mix. Platform development experiments have been performed to understand the behavior of the foam and of the gas separately using two types of capsule. The first experiments using deuterated foam and tritium gas have been performed. Results of these experiments, and the implications for our understanding of thermonuclear burn in heterogeneously mixed separated reactant experiments will be discussed. This work is supported by US DOE/NNSA, performed at LANL, operated by LANS LLC under contract DE-AC52-06NA25396.

  8. The Marble Experiment: Overview and Simulations

    NASA Astrophysics Data System (ADS)

    Douglas, M. R.; Murphy, T. J.; Cobble, J. A.; Fincke, J. R.; Haines, B. M.; Hamilton, C. E.; Lee, M. N.; Oertel, J. A.; Olson, R. E.; Randolph, R. B.; Schmidt, D. W.; Shah, R. C.; Smidt, J. M.; Tregillis, I. L.

    2015-11-01

    The Marble ICF platform has recently been launched on both OMEGA and NIF with the goal to investigate the influence of heterogeneous mix on fusion burn. The unique separated reactant capsule design consists of an ``engineered'' CH capsule filled with deuterated plastic foam that contains pores or voids that are filled with tritium gas. Initially the deuterium and tritium are separated, but as the implosion proceeds, the D and T mix, producing a DT signature. The results of these experiments will be used to inform a probability density function (PDF) burn modelling approach for un-resolved cell morphology. Initial targets for platform development have consisted of either fine-pore foams or gas mixtures, with the goal to field the engineered foams in 2016. An overview of the Marble experimental campaign will be presented and simulations will be discussed. This work is supported by US DOE/NNSA, performed at LANL, operated by LANS LLC under contract DE-AC52-06NA25396.

  9. 48 CFR 970.0370-2 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal....5203-1, Management Controls, in all management and operating contracts. (b) The contracting officer shall insert the clause at 970.5203-2, Performance Improvement and Collaboration, in all management and...

  10. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  11. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  12. 48 CFR 970.2301-2 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Management, in such contracts. (b) Insert the clause at 970.5223-6, Sustainable and Environmentally Preferable Purchasing Practices, or its Alternate I in contracts for the management and operation... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency...

  13. 48 CFR 970.3605 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 970.3605 Section 970.3605 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605...

  14. 41 CFR 102-192.5 - What does this part cover?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this part cover? 102-192.5 Section 102-192.5 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION ADMINISTRATIVE PROGRAMS 192-MAIL MANAGEMENT...

  15. 48 CFR 970.0371-7 - Outside employment of contractor employees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business.... Employees of a management and operating contractor are entitled to the same rights and privileges with... full or part-time basis under a DOE management and operating contract may engage in employment outside...

  16. 41 CFR 105-64.108 - How does GSA safeguard personal information?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How does GSA safeguard personal information? 105-64.108 Section 105-64.108 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General...

  17. 41 CFR 105-74.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does this part affect... Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION Regional Offices-General Services Administration 74-GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE...

  18. 48 CFR 970.1504-1-2 - Fee policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approved Integrated Safety Management System (ISMS), or similar document. As applicable, performance... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-2 Fee policy. (a) DOE management and operating contractors may be paid a fee in accordance with the requirements of this subsection...

  19. 48 CFR 970.2704-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2704-1 General. (a) Rights in data relating to the performance of the contract and to all facilities are significant in... continuing ability to perform its statutory missions that DOE obtain rights to all data produced or...

  20. 48 CFR 970.2704-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2704-1 General. (a) Rights in data relating to the performance of the contract and to all facilities are significant in... continuing ability to perform its statutory missions that DOE obtain rights to all data produced or...

  1. 41 CFR 102-37.195 - Does a SASP have to have a donee in mind to request surplus property?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does a SASP have to have a donee in mind to request surplus property? 102-37.195 Section 102-37.195 Public Contracts and...) Screening and Requesting Property § 102-37.195 Does a SASP have to have a donee in mind to request surplus...

  2. 41 CFR 102-37.195 - Does a SASP have to have a donee in mind to request surplus property?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Does a SASP have to have a donee in mind to request surplus property? 102-37.195 Section 102-37.195 Public Contracts and...) Screening and Requesting Property § 102-37.195 Does a SASP have to have a donee in mind to request surplus...

  3. 41 CFR 102-37.195 - Does a SASP have to have a donee in mind to request surplus property?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Does a SASP have to have a donee in mind to request surplus property? 102-37.195 Section 102-37.195 Public Contracts and...) Screening and Requesting Property § 102-37.195 Does a SASP have to have a donee in mind to request surplus...

  4. 41 CFR 102-37.195 - Does a SASP have to have a donee in mind to request surplus property?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Does a SASP have to have a donee in mind to request surplus property? 102-37.195 Section 102-37.195 Public Contracts and...) Screening and Requesting Property § 102-37.195 Does a SASP have to have a donee in mind to request surplus...

  5. 41 CFR 102-37.195 - Does a SASP have to have a donee in mind to request surplus property?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Does a SASP have to have a donee in mind to request surplus property? 102-37.195 Section 102-37.195 Public Contracts and...) Screening and Requesting Property § 102-37.195 Does a SASP have to have a donee in mind to request surplus...

  6. 41 CFR 102-34.220 - What does GSA do if it learns of unofficial use of a Government motor vehicle?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does GSA do if it learns of unofficial use of a Government motor vehicle? 102-34.220 Section 102-34.220 Public Contracts....220 What does GSA do if it learns of unofficial use of a Government motor vehicle? GSA reports the...

  7. 41 CFR 102-34.220 - What does GSA do if it learns of unofficial use of a Government motor vehicle?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What does GSA do if it learns of unofficial use of a Government motor vehicle? 102-34.220 Section 102-34.220 Public Contracts....220 What does GSA do if it learns of unofficial use of a Government motor vehicle? GSA reports the...

  8. 48 CFR 22.407 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Adjustment (None or Separately Specified Pricing Method), in solicitations and contracts if the contract is... determines the most appropriate contract price adjustment method is the method at 22.404-12(c)(1) or (2); or....222-31, Davis-Bacon Act—Price Adjustment (Percentage Method), in solicitations and contracts if the...

  9. Angiotensin Receptor Blocker Losartan Inhibits Spontaneous Motility of Isolated Human Ureter.

    PubMed

    Jankovic, Slobodan M; Stojadinovic, Dobrivoje; Stojadinovic, Miroslav; Jankovic, Snezana V; Djuric, Janko M; Stojic, Isidora; Kostic, Marina

    2016-12-01

    Ureteral motility is essential for elimination of intraluminal stones, and it may be adversely affected by cardiovascular drugs that a patient is taking chronically. The aim of our study was to test whether ACE inhibitors and an angiotensin receptor blocker may influence spontaneous contractions of isolated human ureter. Both phasic and tonic contractions of the isolated ureteral segments taken from 10 patients were measured as changes of the longitudinal tension or pressure recordings. Captopril, enalapril and losartan were separately added to the organ baths cumulatively. While enalapril (2.7 × 10 -7 -3.9 × 10 -4  M) and captopril (6.1 × 10 -7 -2.7 × 10 -3  M) did not affect either spontaneous activity or tone of isolated ureteral segments, losartan (2.9 × 10 -7 -4.2 × 10 -4  M) caused concentration-dependent inhibition of spontaneous contractions of the segments (50 % effective concentration (EC 50 ) = 13.46 ± 1.80 × 10 -6  M; F = 10.72, r = 0.79, p < 0.001). Due to differences in molecular mechanism of action, angiotensin receptor blocker losartan does and ACE inhibitors captopril and enalapril do not inhibit spontaneous contractions of isolated human ureter.

  10. 2D.02: ACCURACY OF ISOVOLUMETRIC CONTRACTION TIME OBTAINED BY CAROTID ARTERIAL TONOMETRY IN PATIENTS WITH CHRONIC LEFT VENTRICULAR FAILURE.

    PubMed

    Salvi, L; Grillo, A; Marelli, S; Gao, L; Giuliano, A; Trifirò, G; Santini, F; Pini, A; Salvi, P; Viecca, F; Carretta, R; Parati, G

    2015-06-01

    The Buckberg index (SEVR: subendocardial viability ratio) is considered a useful parameter for a non-invasive assessment of the relationship between subendocardial oxygen supply and demand. However, his classic calculation does not include the pre-ejection isovolumic contraction time in stroke work evaluation. The aim of our study was to evaluate the accuracy of the isovolumic contraction time obtained through the carotid pulse wave analysis, to be included in SEVR assessment. In 35 patients (mean age ± SD = 66 ± 13 yrs) followed-up for chronic left ventricular systolic failure (EF = 32 ± 8%) with no significant valvular disease, the pressure curve in the common carotid artery by tonometer (PulsePen) and the aortic transvalvular flow by EchocardioDoppler (Philips-EnVisor C-HD) were acquired simultaneously. The synchronization of data acquisition was verified by comparison of the RR intervals in the ECG signals recorded simultaneously to the two methods. The isovolumic contraction time was separately calculated by considering both the delay between the beginning of the aortic flow wave obtained by EchocardioDoppler and the R wave of the corresponding ECG, and the delay between the foot of the pressure wave recorded in the carotid artery by tonometry compared with the R wave of the corresponding ECG. The latter was corrected by considering the delay between ascending aorta and carotid pulses, computed as a function of the carotid-femoral pulse wave speed and of the distance between the point of carotid pulse acquisition and the sternal notch. The isovolumic contraction time computed by tonometry (68.8 ± 20.2 ms) was closely related to that measured with the EchocardioDoppler approach (68.8 ± 20.5 ms): y = 0.93x + 4.94; r = 0.93; p < 0.0001, with homogeneous distribution in Bland-Altman analysis (mean difference -0.1 ± 7.57 ms). The ratios between isovolumic contraction time and systolic ejection time separately obtained with the two methods (24.8 ± 8.3% and 22.2 ± 8.5%, respectively) were closely related: y = 0.93x + 1.67; r = 0.90 (mean difference -0.1 ± 2.7%). Thus, carotid arterial tonometry allows an accurate and simple assessment of the isovolumic contraction time, which can be employed to improve the assessment of SEVR by also considering the isovolumic contraction time in the stroke work evaluation.

  11. 48 CFR 970.1103-4 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103-4 Section 970.1103-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract...

  12. 48 CFR 970.1100-1 - Performance-based contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance-based... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1100-1 Performance... practicable, performance-based contracting methods in its management and operating contracts. The Office of...

  13. 48 CFR 970.5226-3 - Community commitment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... that its business operations and performance under the Contract will be consistent with the intent of... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5226-3 Community commitment. As prescribed in 48 CFR 970...

  14. 48 CFR 22.404-12 - Labor standards for contracts containing construction requirements and option provisions that...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract price as a result of the incorporation of a new or revised wage determination at the exercise of... contracting officer may include in the contract a separately specified pricing method that permits an... term of the contract. At the time of option exercise, the contracting officer must incorporate a new...

  15. 41 CFR 102-118.25 - Does GSA still require my agency to submit its overall transportation policies for approval?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118-TRANSPORTATION PAYMENT AND AUDIT General Introduction... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does GSA still require...

  16. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  17. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  18. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  19. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  20. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACCOMPLISHMENT OF VESSEL REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Section 1 What this order does. This order cancels NSA Order No. 32 (SRM-1); and outlines the procedure to... repairs under the National Shipping Authority Master Repair Contract, NSA-LUMPSUMREP. The Coast Directors...

  1. 48 CFR 945.570-2 - Disposition of motor vehicles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... vehicles. 945.570-2 Section 945.570-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT... vehicles. (a) The contractor shall dispose of DOE-owned motor vehicles as directed by the contracting officer. (b) DOE-owned motor vehicles may be disposed of as exchange/sale items when directed by the...

  2. 77 FR 74382 - Acquisition Regulation: Department of Energy Acquisition Regulation, Government Property

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... ``; dollar threshold for capital equipment is as established by the DOE Financial Management Handbook.'' 22... equipment is as established by the DOE Financial Management Handbook. Personal property, as used in this..., 952, Solicitation Provisions and Contract Clauses, and 970, Management and Operating Contracts, to...

  3. 41 CFR 102-74.365 - To whom does this subpart apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false To whom does this subpart apply? 102-74.365 Section 102-74.365 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT...

  4. 48 CFR 970.5227-10 - Patent rights-management and operating contracts, nonprofit organization or small business firm...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-level nuclear waste and spent fuel technology; and (C) National security technologies classified or... Energy (DOE) Patent Counsel assisting the DOE contracting activity. (7) Practical application means to... inventions. (i) Inventions within or relating to the following fields of technology are exceptional...

  5. 48 CFR 970.5227-10 - Patent rights-management and operating contracts, nonprofit organization or small business firm...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-level nuclear waste and spent fuel technology; and (C) National security technologies classified or... Energy (DOE) Patent Counsel assisting the DOE contracting activity. (7) Practical application means to... inventions. (i) Inventions within or relating to the following fields of technology are exceptional...

  6. 41 CFR 102-118.480 - How does my agency settle disputes with a TSP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How does my agency settle disputes with a TSP? 102-118.480 Section 102-118.480 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION...

  7. 41 CFR 102-85.195 - Does GSA provide special services?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does GSA provide special services? 102-85.195 Section 102-85.195 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 85-PRICING POLICY FOR...

  8. 48 CFR 970.2702-5 - Rights to proposal data.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2702-5 Rights... Proposal Data, in all solicitations and contracts for the management and operation of DOE sites and... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Rights to proposal data...

  9. 48 CFR 970.5223-4 - Workplace Substance Abuse Programs at DOE Sites.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Workplace Substance Abuse... and Contract Clauses for Management and Operating Contracts 970.5223-4 Workplace Substance Abuse... 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites, incorporated herein by reference...

  10. 48 CFR 970.5223-4 - Workplace Substance Abuse Programs at DOE Sites.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Workplace Substance Abuse... and Contract Clauses for Management and Operating Contracts 970.5223-4 Workplace Substance Abuse... 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites, incorporated herein by reference...

  11. 48 CFR 970.5223-4 - Workplace Substance Abuse Programs at DOE Sites.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Workplace Substance Abuse... and Contract Clauses for Management and Operating Contracts 970.5223-4 Workplace Substance Abuse... 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites, incorporated herein by reference...

  12. 48 CFR 970.5223-4 - Workplace Substance Abuse Programs at DOE Sites.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Workplace Substance Abuse... and Contract Clauses for Management and Operating Contracts 970.5223-4 Workplace Substance Abuse... 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites, incorporated herein by reference...

  13. 48 CFR 970.5223-4 - Workplace Substance Abuse Programs at DOE Sites.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Workplace Substance Abuse... and Contract Clauses for Management and Operating Contracts 970.5223-4 Workplace Substance Abuse... 10 CFR part 707, Workplace Substance Abuse Programs at DOE Sites, incorporated herein by reference...

  14. 41 CFR 102-34.5 - What does this part cover?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this part cover? 102-34.5 Section 102-34.5 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 34-MOTOR VEHICLE MANAGEMENT...

  15. 41 CFR 102-173.20 - To whom does this part apply?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false To whom does this part apply? 102-173.20 Section 102-173.20 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  16. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  17. 41 CFR 102-173.20 - To whom does this part apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false To whom does this part apply? 102-173.20 Section 102-173.20 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  18. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  19. 41 CFR 102-173.20 - To whom does this part apply?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false To whom does this part apply? 102-173.20 Section 102-173.20 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  20. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  1. 41 CFR 102-173.20 - To whom does this part apply?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false To whom does this part apply? 102-173.20 Section 102-173.20 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  2. 41 CFR 102-173.20 - To whom does this part apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false To whom does this part apply? 102-173.20 Section 102-173.20 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  3. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  4. 41 CFR 102-173.75 - How long does the process take?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false How long does the process take? 102-173.75 Section 102-173.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TELECOMMUNICATIONS 173-INTERNET GOV...

  5. 41 CFR 105-74.100 - What does this part do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this part do? 105-74.100 Section 105-74.100 Public Contracts and Property Management Federal Property Management... Administration 74-GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage...

  6. 75 FR 68217 - Acquisition Regulation: Agency Supplementary Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... amending the Department of Energy Acquisition Regulation (DEAR) on DOE Management and Operating Contracts..., and update references. Today's rule does not alter substantive rights or obligations under current law... Contracts to conform it to the FAR. None of today's changes are substantive or of a nature to cause any...

  7. 48 CFR 925.7004 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting officer shall insert the clause at 952.225-70, Subcontracting for Nuclear Hot Cell Services, in solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  8. 48 CFR 731.205-70 - Overseas recruitment incentive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... incentive. 731.205-70 Section 731.205-70 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial... overseas under a contract does not qualify for the exemption for overseas income provided under section 911...

  9. 48 CFR 925.7004 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting officer shall insert the clause at 952.225-70, Subcontracting for Nuclear Hot Cell Services, in solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  10. 48 CFR 925.7004 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting officer shall insert the clause at 952.225-70, Subcontracting for Nuclear Hot Cell Services, in solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  11. 48 CFR 925.7004 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting officer shall insert the clause at 952.225-70, Subcontracting for Nuclear Hot Cell Services, in solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  12. 48 CFR 925.7004 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting officer shall insert the clause at 952.225-70, Subcontracting for Nuclear Hot Cell Services, in solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  13. 48 CFR 970.3102-05-6 - Compensation for personal services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contract Cost Principles and... of the contract. This personnel appendix shall be negotiated using the principles and policies of 48... related expenses allowable under the contract and documents personnel policies, practices and plans which...

  14. 25 CFR 900.246 - What does reassumption mean?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT..., in whole or in part, of a contract and assuming or resuming control or operation of the contracted...

  15. 48 CFR 22.1008-1 - Obtaining wage determinations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Labor. If the WDOL database does not contain the applicable prevailing wage determination for a contract... employees to be utilized in performance of the contract using the Wage and Hour Division's Service Contract...

  16. Relational Contract: Applicable to Department of Defense Contracts

    DTIC Science & Technology

    1989-12-01

    examine the evolution of contract law and, in particular, the role of contractual incompleteness in exchange relationships. 2.1.1. The Classical Approach...Classical contract law facilitates exchange by separately detailing all aspects of the contracting process 9 at the outset by prespecification of all...modifications after contractual performance has begun. According to Williamson (1979), classical contract law implements prespecification through legal

  17. 48 CFR 22.1003-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Service Contract Act of 1965, as Amended 22.1003-1 General. This subpart 22.10 applies to all Government contracts, the principal purpose of which... does not apply to individual contract requirements for services in contracts not having as their...

  18. 48 CFR 970.3605-2 - Special construction clause for operating contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605-2 Special construction clause for operating contracts. The clause at... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Special construction...

  19. 48 CFR 970.3605-2 - Special construction clause for operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Construction and Architect-Engineer Contracts 970.3605-2 Special construction clause for operating contracts. The clause at... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Special construction...

  20. 76 FR 51878 - Modifications of Certain Derivative Contracts; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... Modifications of Certain Derivative Contracts; Correction AGENCY: Internal Revenue Service (IRS), Treasury... derivative contracts does not result in an exchange to the nonassigning counterparty for purposes of Sec. 1... derivative contract to another dealer in securities or'' is corrected to read ``or a clearinghouse transfers...

  1. 24 CFR 21.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contracts that I receive? 21.115 Section 21.115 Housing and Urban Development Office of the Secretary... future contract awards indirectly if you are debarred or suspended for a violation of the requirements of... contracts. The portion of the Drug-Free Workplace Act of 1988 that applies to Federal procurement contracts...

  2. 41 CFR 105-68.610 - What procedures does the General Services Administration use in suspension and debarment actions?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What procedures does the... Public Contracts and Property Management Federal Property Management Regulations System (Continued..., consistent with principles of fundamental fairness. (a) For suspension actions, we use the procedures in this...

  3. 41 CFR 102-117.105 - What does best value mean when routing a shipment?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 117-TRANSPORTATION MANAGEMENT Business Rules To Consider Before Shipping Freight or Household Goods... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does best value mean when routing a shipment? 102-117.105 Section 102-117.105 Public Contracts and Property Management...

  4. 41 CFR 102-85.20 - What does an Occupancy Agreement (OA) do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... defines GSA's relationship with each customer agency and: (a) Establishes specific financial terms... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does an Occupancy Agreement (OA) do? 102-85.20 Section 102-85.20 Public Contracts and Property Management Federal Property...

  5. 41 CFR 102-192.95 - Why does GSA require annual mail management reports?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... under the Federal Records Act, especially with regards to sharing best practices, training, standards... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Why does GSA require annual mail management reports? 102-192.95 Section 102-192.95 Public Contracts and Property Management...

  6. 41 CFR 102-192.95 - Why does GSA require annual mail management reports?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... under the Federal Records Act, especially with regards to sharing best practices, training, standards... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Why does GSA require annual mail management reports? 102-192.95 Section 102-192.95 Public Contracts and Property Management...

  7. 41 CFR 102-192.95 - Why does GSA require annual mail management reports?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... under the Federal Records Act, especially with regards to sharing best practices, training, standards... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Why does GSA require annual mail management reports? 102-192.95 Section 102-192.95 Public Contracts and Property Management...

  8. 41 CFR 102-192.95 - Why does GSA require annual mail management reports?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... under the Federal Records Act, especially with regards to sharing best practices, training, standards... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Why does GSA require annual mail management reports? 102-192.95 Section 102-192.95 Public Contracts and Property Management...

  9. 41 CFR 102-192.95 - Why does GSA require annual mail management reports?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... under the Federal Records Act, especially with regards to sharing best practices, training, standards... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Why does GSA require annual mail management reports? 102-192.95 Section 102-192.95 Public Contracts and Property Management...

  10. 2 CFR 1401.120 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false Does this part affect the Federal contracts that I receive? 1401.120 Section 1401.120 Grants and Agreements Federal Agency Regulations for Grants and Agreements DEPARTMENT OF THE INTERIOR REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE...

  11. 48 CFR 945.570-7 - Disposition of motor vehicles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... vehicles. 945.570-7 Section 945.570-7 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT... Disposition of motor vehicles. (a) The contractor shall dispose of DOE-owned motor vehicles as directed by the contracting officer. (b) DOE-owned motor vehicles may be disposed of as exchange/sale items when directed by...

  12. 41 CFR 102-76.40 - To which real property actions does NEPA apply?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false To which real property actions does NEPA apply? 102-76.40 Section 102-76.40 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN...

  13. 41 CFR 102-76.40 - To which real property actions does NEPA apply?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false To which real property actions does NEPA apply? 102-76.40 Section 102-76.40 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN...

  14. 41 CFR 102-76.40 - To which real property actions does NEPA apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false To which real property actions does NEPA apply? 102-76.40 Section 102-76.40 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN...

  15. 41 CFR 102-76.40 - To which real property actions does NEPA apply?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false To which real property actions does NEPA apply? 102-76.40 Section 102-76.40 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN...

  16. 10 CFR 1015.103 - Antitrust, fraud, tax, interagency, transportation account audit, acquisition contract, and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... does not apply to tax debts. (c) Part 1015 does not apply to claims between Federal agencies. Federal... 10 Energy 4 2010-01-01 2010-01-01 false Antitrust, fraud, tax, interagency, transportation account... General § 1015.103 Antitrust, fraud, tax, interagency, transportation account audit, acquisition contract...

  17. 41 CFR 102-85.50 - When does availability of funding have to be certified?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false When does availability of funding have to be certified? 102-85.50 Section 102-85.50 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 85...

  18. 41 CFR 102-36.10 - What does this part cover?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does this part cover? 102-36.10 Section 102-36.10 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 36-DISPOSITION OF EXCESS PERSONAL PROPERTY General Provisions § 102...

  19. 41 CFR 102-85.50 - When does availability of funding have to be certified?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false When does availability of funding have to be certified? 102-85.50 Section 102-85.50 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 85...

  20. 41 CFR 102-76.40 - To which real property actions does NEPA apply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false To which real property actions does NEPA apply? 102-76.40 Section 102-76.40 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 76-DESIGN...

  1. 41 CFR 102-75.390 - What does the term “surplus airport property” mean?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does the term âsurplus airport propertyâ mean? 102-75.390 Section 102-75.390 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75...

  2. 41 CFR 102-85.20 - What does an Occupancy Agreement (OA) do?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... defines GSA's relationship with each customer agency and: (a) Establishes specific financial terms... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What does an Occupancy Agreement (OA) do? 102-85.20 Section 102-85.20 Public Contracts and Property Management Federal Property...

  3. 41 CFR 102-85.20 - What does an Occupancy Agreement (OA) do?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... defines GSA's relationship with each customer agency and: (a) Establishes specific financial terms... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What does an Occupancy Agreement (OA) do? 102-85.20 Section 102-85.20 Public Contracts and Property Management Federal Property...

  4. 41 CFR 102-85.20 - What does an Occupancy Agreement (OA) do?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... defines GSA's relationship with each customer agency and: (a) Establishes specific financial terms... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What does an Occupancy Agreement (OA) do? 102-85.20 Section 102-85.20 Public Contracts and Property Management Federal Property...

  5. 41 CFR 102-85.20 - What does an Occupancy Agreement (OA) do?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... defines GSA's relationship with each customer agency and: (a) Establishes specific financial terms... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What does an Occupancy Agreement (OA) do? 102-85.20 Section 102-85.20 Public Contracts and Property Management Federal Property...

  6. Swelling and Contraction of Corn Mitochondria 1

    PubMed Central

    Stoner, C. D.; Hanson, J. B.

    1966-01-01

    A survey has been made of the properties of corn mitochondria in swelling and contraction. The mitochondria swell spontaneously in KCl but not in sucrose. Aged mitochondria will swell rapidly in sucrose if treated with citrate or EDTA. Swelling does not impair oxidative phosphorylation if bovine serum albumin is present. Contraction can be maintained or initiated with ATP + Mg or an oxidizable substrate, contraction being more rapid with the substrate. Magnesium is not required for substrate powered contraction. Contraction powered by ATP is accompanied by the release of phosphate. Oligomycin inhibits both ATP-powered contraction and the release of phosphate. However, it does not affect substrate-powered contraction. Substrate powered contraction is inhibited by electron-transport inhibitors. The uncoupler, carbonyl cyanide m-chlorophenyl hydrazone, accelerates swelling and inhibits both ATP-and substrate-powered contraction. However, the concentrations required are well in excess of those required to produce uncoupling and to accelerate adenosine triphosphatase; the concentrations required inhibit respiration in a phosphorylating medium. Phosphate is a very effective inhibitor of succinate-powered contraction. Neither oligomycin nor Mg affects the phosphate inhibition. Phosphate is less inhibitory with the ATP-powered contraction. The results are discussed in terms of a hypothesis that contraction is associated with a nonphosphorylated high energy intermediate of oxidative phosphorylation. Images PMID:16656248

  7. Experimental investigation of differential confinement effects in a rotating helicon plasma

    NASA Astrophysics Data System (ADS)

    Gueroult, Renaud; Evans, Eugene; Zweben, Stewart J.; Fisch, Nathaniel J.; Levinton, Fred

    2014-10-01

    Although plasmas have long been considered for isotope separation, challenges presented by nuclear waste remediation and nuclear spent fuel reprocessing have recently sparked a renewed interest for high-throughput plasma based mass separation techniques. Different filter concepts relying on rotating plasmas have been proposed to address these needs. However, one of the challenges common to these concepts is the need to control the plasma rotation profile, which is generally assumed to be provided by means of dedicated electrodes. An experimental effort aiming to evaluate the practicality of these plasma filter concepts has recently been started at PPPL. For this purpose, a linear helicon plasma source is used in combination with concentric ring electrodes. Preliminary biasing experiments results indicate floating potential profiles locally suitable for mass discrimination for different gas mixtures (Ar/Ne, Ar/N2, Ar/Kr). Radially resolved spectroscopic measurements and neutral gas composition analysis at two different axial positions are being planned to assess the mass separation effect. Work supported by US DOE under Contract No. DE-AC02-09CH11466.

  8. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  9. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  10. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  11. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  12. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  13. 48 CFR 970.2770-4 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Patents, Data, and Copyrights 970.2770-4... facility management and operating contract. (b) If the contractor is a nonprofit organization or small business eligible under 35 U.S.C. 200 et seq., to receive title to any inventions under the contract and...

  14. 48 CFR 970.5222-1 - Collective Bargaining Agreements Management and Operating Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Collective Bargaining Agreements Management and Operating Contracts. 970.5222-1 Section 970.5222-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses...

  15. 29 CFR 4.111 - Contracts “to furnish services.”

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the types of services which may be contracted for under a contract the principal purpose of which is to furnish services. Further, the nomenclature, type, or particular form of contract used by... indirectly through the definition of service employee the Act does not define, or limit, the types of...

  16. Involvement of an Actomyosin Contractile Ring in Saccharomyces cerevisiae Cytokinesis

    PubMed Central

    Bi, Erfei; Maddox, Paul; Lew, Daniel J.; Salmon, E.D.; McMillan, John N.; Yeh, Elaine; Pringle, John R.

    1998-01-01

    In Saccharomyces cerevisiae, the mother cell and bud are connected by a narrow neck. The mechanism by which this neck is closed during cytokinesis has been unclear. Here we report on the role of a contractile actomyosin ring in this process. Myo1p (the only type II myosin in S. cerevisiae) forms a ring at the presumptive bud site shortly before bud emergence. Myo1p ring formation depends on the septins but not on F-actin, and preexisting Myo1p rings are stable when F-actin is depolymerized. The Myo1p ring remains in the mother–bud neck until the end of anaphase, when a ring of F-actin forms in association with it. The actomyosin ring then contracts to a point and disappears. In the absence of F-actin, the Myo1p ring does not contract. After ring contraction, cortical actin patches congregate at the mother–bud neck, and septum formation and cell separation rapidly ensue. Strains deleted for MYO1 are viable; they fail to form the actin ring but show apparently normal congregation of actin patches at the neck. Some myo1Δ strains divide nearly as efficiently as wild type; other myo1Δ strains divide less efficiently, but it is unclear whether the primary defect is in cytokinesis, septum formation, or cell separation. Even cells lacking F-actin can divide, although in this case division is considerably delayed. Thus, the contractile actomyosin ring is not essential for cytokinesis in S. cerevisiae. In its absence, cytokinesis can still be completed by a process (possibly localized cell–wall synthesis leading to septum formation) that appears to require septin function and to be facilitated by F-actin. PMID:9732290

  17. 48 CFR 4.1501 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... tracking Recovery Act funds. For example, the contracting officer may consider awarding dedicated separate... contract action funded in whole or in part by the Recovery Act, the contracting officer shall indicate that the contract action is being made under the Recovery Act, and indicate which products or services are...

  18. 48 CFR 742.1170-3 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 742.1170-3 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Production, Surveillance, and Reporting 742.1170-3 Policy. (a) The contractor is responsible for timely contract performance. Performance monitoring by USAID does not obviate...

  19. 26 CFR 1.408(q)-1 - Deemed IRAs in qualified employer plans.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... governing instrument creating the trust must satisfy the requirements of section 408(a) (1), (2), (3), (4... accounts of any of the deemed IRAs is invested in life insurance contracts, regardless of whether the separate account for the qualified employer plan invests in life insurance contracts. (iii) Separate...

  20. 26 CFR 1.408(q)-1 - Deemed IRAs in qualified employer plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... governing instrument creating the trust must satisfy the requirements of section 408(a) (1), (2), (3), (4... accounts of any of the deemed IRAs is invested in life insurance contracts, regardless of whether the separate account for the qualified employer plan invests in life insurance contracts. (iii) Separate...

  1. The chemical enhancement of the triboelectric separation of coal from pyrite and ash: A novel approach for electrostatic separation of mineral matter from coal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gustafson, R.M.; DiMare, S.; Sabatini, J.

    1992-02-01

    Arthur D. Little, Inc., under contract to the US DOE Pittsburgh Energy Technology Center, has developed a triboelectric separation device for coal beneficiation, that employs an entrained-flow, rotating-cylinder concept. The described apparatus has been used to test the efficacy of chemical pretreatment and in-situ treatment of coal on separation efficiency. Coal particle entrainment is achieved with gaseous carbon dioxide and particle collection is accomplished by an electrostatic plate separator. The triboelectric separation device incorporates instrumentation for the direct measurement of charge in the dilute-phase particle stream. Some of the pretreatment materials investigated under this project to modify the surface chargingmore » characteristics of the coal included oleic acid, sodium oleate, quinoline and dicyclohexylamine. Ammonia and sulfur dioxide at a concentration up to 1000 ppM was used for in-situ treatment of the coal, with carbon dioxide as the carrier/inerting gas. Nitrogen was used earlier in the test program as the carrier/inerting gas for the coal, but a severe arcing problem was encountered in the electrostatic collector with nitrogen as the carrier gas. This problem did not occur when carbon dioxide was used. The report covers the chemical treatment employed, and summarizes and interprets the results achieved. In addition, an economic analysis of a full scale system based on this concept is presented.« less

  2. HANFORD SITE RIVER CORRIDOR CLEANUP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanfordmore » river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.« less

  3. 43 CFR 3602.14 - What kind of financial security does BLM require?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DISPOSAL Mineral Materials Sales Applications § 3602.14 What kind of financial security does BLM require? (a) For contracts of $2,000 or more, BLM will require a performance bond of an amount sufficient to meet the reclamation standards provided for in the contract, but at least $500. If you have a sales...

  4. 41 CFR 102-75.320 - Does appraisal information need to be kept confidential?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does appraisal information need to be kept confidential? 102-75.320 Section 102-75.320 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real...

  5. 41 CFR 102-3.20 - How does this part meet the needs of its audience?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false How does this part meet the needs of its audience? 102-3.20 Section 102-3.20 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION GENERAL 3-FEDERAL ADVISORY...

  6. 34 CFR 365.23 - How does a State make a subgrant or enter into a contract?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false How does a State make a subgrant or enter into a contract? 365.23 Section 365.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE...

  7. 34 CFR 365.23 - How does a State make a subgrant or enter into a contract?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true How does a State make a subgrant or enter into a contract? 365.23 Section 365.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE...

  8. 41 CFR 109-1.106-50 - Applicability of FPMR and DOE-PMR.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulation (DEAR), 48 CFR part 945. (g) Regulations for the management of personal property held by financial... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Applicability of FPMR and DOE-PMR. 109-1.106-50 Section 109-1.106-50 Public Contracts and Property Management Federal...

  9. 31 CFR 20.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Does this part affect the Federal contracts that I receive? 20.115 Section 20.115 Money and Finance: Treasury Office of the Secretary of the Treasury GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage...

  10. 31 CFR 20.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Does this part affect the Federal contracts that I receive? 20.115 Section 20.115 Money and Finance: Treasury Office of the Secretary of the Treasury GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage...

  11. 31 CFR 20.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Does this part affect the Federal contracts that I receive? 20.115 Section 20.115 Money and Finance: Treasury Office of the Secretary of the Treasury GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage...

  12. 31 CFR 20.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Does this part affect the Federal contracts that I receive? 20.115 Section 20.115 Money and Finance: Treasury Office of the Secretary of the Treasury GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage...

  13. 31 CFR 20.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Does this part affect the Federal contracts that I receive? 20.115 Section 20.115 Money and Finance: Treasury Office of the Secretary of the Treasury GOVERNMENTWIDE REQUIREMENTS FOR DRUG-FREE WORKPLACE (FINANCIAL ASSISTANCE) Purpose and Coverage...

  14. 29 CFR 94.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...? 94.115 Section 94.115 Labor Office of the Secretary of Labor GOVERNMENTWIDE REQUIREMENTS FOR DRUG... for a violation of the requirements of this part, as described in § 94. 510(c). However, this part does not apply directly to procurement contracts. The portion of the Drug-Free Workplace Act of 1988...

  15. 29 CFR 94.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...? 94.115 Section 94.115 Labor Office of the Secretary of Labor GOVERNMENTWIDE REQUIREMENTS FOR DRUG... for a violation of the requirements of this part, as described in § 94. 510(c). However, this part does not apply directly to procurement contracts. The portion of the Drug-Free Workplace Act of 1988...

  16. 29 CFR 94.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...? 94.115 Section 94.115 Labor Office of the Secretary of Labor GOVERNMENTWIDE REQUIREMENTS FOR DRUG... for a violation of the requirements of this part, as described in § 94. 510(c). However, this part does not apply directly to procurement contracts. The portion of the Drug-Free Workplace Act of 1988...

  17. 29 CFR 94.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...? 94.115 Section 94.115 Labor Office of the Secretary of Labor GOVERNMENTWIDE REQUIREMENTS FOR DRUG... for a violation of the requirements of this part, as described in § 94. 510(c). However, this part does not apply directly to procurement contracts. The portion of the Drug-Free Workplace Act of 1988...

  18. 41 CFR 102-75.765 - What does the term “law enforcement” mean?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does the term âlaw enforcementâ mean? 102-75.765 Section 102-75.765 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real Property Disposal...

  19. 41 CFR 102-75.320 - Does appraisal information need to be kept confidential?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false Does appraisal information need to be kept confidential? 102-75.320 Section 102-75.320 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real...

  20. 41 CFR 102-75.320 - Does appraisal information need to be kept confidential?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Does appraisal information need to be kept confidential? 102-75.320 Section 102-75.320 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real...

  1. 41 CFR 102-75.320 - Does appraisal information need to be kept confidential?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Does appraisal information need to be kept confidential? 102-75.320 Section 102-75.320 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real...

  2. 41 CFR 102-75.320 - Does appraisal information need to be kept confidential?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Does appraisal information need to be kept confidential? 102-75.320 Section 102-75.320 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY DISPOSAL Surplus Real...

  3. 24 CFR 982.603 - SRO: Lease and HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false SRO: Lease and HAP contract. 982... Types Single Room Occupancy (sro) § 982.603 SRO: Lease and HAP contract. For SRO housing, there is a separate lease and HAP contract for each assisted person. ...

  4. Teaching Contracts with Contracts

    ERIC Educational Resources Information Center

    Misner, Robert L.

    1977-01-01

    The teaching of contracts law is an area that lends itself easily to introducing students to realistic factual situations. An exercise is described in which students were assigned to separate "firms" with volunteers from the later law school classes as clients. Each firm was responsible for submitting a signed contract and an accompanying paper.…

  5. Contracting for Independent Evaluation: Approaches to an Inherent Tension

    ERIC Educational Resources Information Center

    Klerman, Jacob Alex

    2010-01-01

    There has recently been discussion of whether independent contract evaluation is possible. This article acknowledges the inherent tension in contract evaluation and in response suggests a range of constructive approaches to improving the independence of contract evaluation. In particular, a clear separation between the official evaluation report…

  6. 39 CFR 601.109 - Contract claims and disputes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....S.C. 601-613). If ADR is used, the SDR official may serve as a mediator for contract performance... decision on a claim, and even when the supplier does not agree to use ADR, the contracting officer should...

  7. 48 CFR 16.306 - Cost-plus-fixed-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-plus-fixed-fee...-fee contracts. (a) Description. A cost-plus-fixed-fee contract is a cost-reimbursement contract that.... The fixed fee does not vary with actual cost, but may be adjusted as a result of changes in the work...

  8. 49 CFR 1313.8 - Contract summary for grain products-not involving a port.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Contract summary for grain products-not involving... RAILROAD CONTRACTS FOR THE TRANSPORTATION OF AGRICULTURAL PRODUCTS § 1313.8 Contract summary for grain... grain products that does not involve service to or from a port must contain the information specified in...

  9. 48 CFR 970.2904-1 - Management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Management and operating contracts. 970.2904-1 Section 970.2904-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Taxes 970.2904-1 Management and operating contracts. (a) Pursuant to 48 CFR 2...

  10. 48 CFR 970.0371-9 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clause. 970.0371-9 Section 970.0371-9 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  11. 48 CFR 970.0370-2 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clause. 970.0370-2 Section 970.0370-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal...

  12. 48 CFR 970.2304-2 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-2 Section 970.2304-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2304-2 Contract clause. Link...

  13. 48 CFR 970.2301-2 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-2 Section 970.2301-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301-2 Contract clauses. (a...

  14. 48 CFR 970.2301-2 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-2 Section 970.2301-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301-2 Contract clauses. (a...

  15. 48 CFR 970.2301-2 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-2 Section 970.2301-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301-2 Contract clauses. (a...

  16. 48 CFR 970.2307-2 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-2 Section 970.2307-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2307-2 Contract clause. Link...

  17. 48 CFR 970.2301-2 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-2 Section 970.2301-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2301-2 Contract clauses. (a...

  18. 23 CFR 636.119 - How does this part apply to a project developed under a public-private partnership?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS DESIGN-BUILD CONTRACTING General § 636.119 How... engineering service contracts, 23 CFR part 635 for construction contracts and the requirements of this part...

  19. 48 CFR 970.2303-3 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-3 Section 970.2303-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a...

  20. 48 CFR 970.2303-3 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-3 Section 970.2303-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a...

  1. 48 CFR 970.2303-3 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-3 Section 970.2303-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a...

  2. 48 CFR 970.2303-3 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-3 Section 970.2303-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a...

  3. 48 CFR 970.2303-3 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-3 Section 970.2303-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2303-3 Contract clauses. (a...

  4. 48 CFR 970.5203-2 - Performance improvement and collaboration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5203-2 Performance improvement and... practices, where appropriate, that will improve performance in the areas of environmental and health, safety...

  5. 24 CFR 3288.5 - Retailer notification at sale.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Retailer notification at sale. 3288... sale. Retailer notice at the time of signing. At the time of signing a contract for sale or lease for a... separate document from the sales contract or may be incorporated clearly in a separate section on consumer...

  6. 26 CFR 1.801-8 - Contracts with reserves based on segregated asset accounts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...). The company retained with respect to such reserves from gross investment income on Separate Account A... retained with respect to such reserves from gross investment income on Separate Account B a total of $5,720... 26 Internal Revenue 8 2010-04-01 2010-04-01 false Contracts with reserves based on segregated...

  7. 43 CFR 3602.14 - What kind of financial security does BLM require?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What kind of financial security does BLM...? (a) For contracts of $2,000 or more, BLM will require a performance bond of an amount sufficient to... post a performance bond. (b) BLM may require a performance bond for contracts of less than $2,000. We...

  8. 43 CFR 3602.14 - What kind of financial security does BLM require?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What kind of financial security does BLM...? (a) For contracts of $2,000 or more, BLM will require a performance bond of an amount sufficient to... post a performance bond. (b) BLM may require a performance bond for contracts of less than $2,000. We...

  9. 43 CFR 3602.14 - What kind of financial security does BLM require?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What kind of financial security does BLM...? (a) For contracts of $2,000 or more, BLM will require a performance bond of an amount sufficient to... post a performance bond. (b) BLM may require a performance bond for contracts of less than $2,000. We...

  10. 7 CFR 1410.56 - Division of payments and provisions about tenants and sharecroppers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participation as a tenant does or does not have an interest in the acreage offered for enrollment in the CRP. (b) CCC may remove an operator or tenant from a CRP contract when: (1) The operator or tenant requests in writing to be removed from the CRP contract; (2) The operator or tenant files for bankruptcy and the...

  11. 41 CFR 105-68.105 - Does this part apply to me?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false Does this part apply to me? 105-68.105 Section 105-68.105 Public Contracts and Property Management Federal Property... apply to me? Portions of this part (see table at § 105-68.25(b)) apply to you if you are a(n)— (a...

  12. 41 CFR 105-68.105 - Does this part apply to me?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Does this part apply to me? 105-68.105 Section 105-68.105 Public Contracts and Property Management Federal Property... apply to me? Portions of this part (see table at § 105-68.25(b)) apply to you if you are a(n)— (a...

  13. 41 CFR 105-68.105 - Does this part apply to me?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false Does this part apply to me? 105-68.105 Section 105-68.105 Public Contracts and Property Management Federal Property... apply to me? Portions of this part (see table at § 105-68.25(b)) apply to you if you are a(n)— (a...

  14. 41 CFR 105-68.105 - Does this part apply to me?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Does this part apply to me? 105-68.105 Section 105-68.105 Public Contracts and Property Management Federal Property... apply to me? Portions of this part (see table at § 105-68.25(b)) apply to you if you are a(n)— (a...

  15. 25 CFR 900.10 - How does an Indian tribe or tribal organization secure a list of all Federal property currently...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false How does an Indian tribe or tribal organization secure a... activities that benefit the Indian tribe or tribal organization to assist in negotiating a contract? 900.10..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION...

  16. 25 CFR 900.130 - What role does the Indian tribe or tribal organization play during the performance of a self...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... self-determination construction contract? (a) The Indian tribe or tribal organization is responsible... self-determination contract budget; (ii) The Indian tribe or tribal organization may not issue a change... 25 Indians 2 2014-04-01 2014-04-01 false What role does the Indian tribe or tribal organization...

  17. 25 CFR 900.130 - What role does the Indian tribe or tribal organization play during the performance of a self...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... self-determination construction contract? (a) The Indian tribe or tribal organization is responsible... self-determination contract budget; (ii) The Indian tribe or tribal organization may not issue a change... 25 Indians 2 2012-04-01 2012-04-01 false What role does the Indian tribe or tribal organization...

  18. 25 CFR 900.130 - What role does the Indian tribe or tribal organization play during the performance of a self...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... self-determination construction contract? (a) The Indian tribe or tribal organization is responsible... self-determination contract budget; (ii) The Indian tribe or tribal organization may not issue a change... 25 Indians 2 2011-04-01 2011-04-01 false What role does the Indian tribe or tribal organization...

  19. 25 CFR 900.10 - How does an Indian tribe or tribal organization secure a list of all Federal property currently...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false How does an Indian tribe or tribal organization secure a... activities that benefit the Indian tribe or tribal organization to assist in negotiating a contract? 900.10..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION...

  20. 25 CFR 900.10 - How does an Indian tribe or tribal organization secure a list of all Federal property currently...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false How does an Indian tribe or tribal organization secure a... activities that benefit the Indian tribe or tribal organization to assist in negotiating a contract? 900.10..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION...

  1. 25 CFR 900.130 - What role does the Indian tribe or tribal organization play during the performance of a self...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... self-determination construction contract? (a) The Indian tribe or tribal organization is responsible... self-determination contract budget; (ii) The Indian tribe or tribal organization may not issue a change... 25 Indians 2 2010-04-01 2010-04-01 false What role does the Indian tribe or tribal organization...

  2. 25 CFR 900.10 - How does an Indian tribe or tribal organization secure a list of all Federal property currently...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false How does an Indian tribe or tribal organization secure a... activities that benefit the Indian tribe or tribal organization to assist in negotiating a contract? 900.10..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION...

  3. 25 CFR 900.130 - What role does the Indian tribe or tribal organization play during the performance of a self...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... self-determination construction contract? (a) The Indian tribe or tribal organization is responsible... self-determination contract budget; (ii) The Indian tribe or tribal organization may not issue a change... 25 Indians 2 2013-04-01 2013-04-01 false What role does the Indian tribe or tribal organization...

  4. 20 CFR 1002.7 - How does USERRA relate to other laws, public and private contracts, and employer practices?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false How does USERRA relate to other laws, public and private contracts, and employer practices? 1002.7 Section 1002.7 Employees' Benefits OFFICE OF THE... a floor, not a ceiling, for the employment and reemployment rights and benefits of those it protects...

  5. 41 CFR 102-118.335 - What does the GSA Audit Division consider when verifying an agency prepayment audit program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does the GSA Audit Division consider when verifying an agency prepayment audit program? 102-118.335 Section 102-118.335 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION TRANSPORTATION 118...

  6. 41 CFR 102-75.55 - What does the term “Not being put to optimum use” mean?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does the term âNot being put to optimum useâ mean? 102-75.55 Section 102-75.55 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75...

  7. Questionable payments for work of a contractor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-09-23

    Examination of three support contracts for international R and D disclosed fundamental weaknesses in DOE controls over the (1) receipt and acceptance of goods and services, (2) authorization and payments for work, and (3) analyses of price proposals submitted by the contractor. As a result of these weaknesses, there was no clear and convincing record of what DOE got for most of the $2.5 million it spent on these contracts. Neither was there a downward adjustment in the amounts paid by DOE under two of the contracts although such an adjustment was required by the contracts. Much of the workmore » done by the contractor was not properly authorized. Finally, analyses by the San Francisco Operations Office of certain of the price proposals submitted by the contractor did not ensure that DOE obtained a fair and reasonable price. Recommendations addressed these issues to the Procurement Office, the Controller, the Assistant Secretaries for Conservation and Renewable Energy and Fossil Energy, and the Manager, San Francisco Operations Office who indicated general agreement with the findings and a willingness to immediately pursue the remedial measure that were recommended. Their comments are appended.« less

  8. 48 CFR 39.002 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY 39.002 Definitions. As used in this part— Modular contracting means use of one or more contracts to acquire information technology systems in successive...; or (5) Is critical to the direct fulfillment of military or intelligence missions. This does not...

  9. 48 CFR 39.002 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY 39.002 Definitions. As used in this part— Modular contracting means use of one or more contracts to acquire information technology systems in successive...; or (5) Is critical to the direct fulfillment of military or intelligence missions. This does not...

  10. 48 CFR 39.002 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY 39.002 Definitions. As used in this part— Modular contracting means use of one or more contracts to acquire information technology systems in successive...; or (5) Is critical to the direct fulfillment of military or intelligence missions. This does not...

  11. 48 CFR 39.002 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY 39.002 Definitions. As used in this part— Modular contracting means use of one or more contracts to acquire information technology systems in successive...; or (5) Is critical to the direct fulfillment of military or intelligence missions. This does not...

  12. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  13. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  14. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 48 CFR 970... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  15. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  16. 48 CFR 970.5232-2 - Payments and advances.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5232-2 Payments and advances. As prescribed in 970.3270(a... Contractor's rights to any refunds, rebates, allowances, accounts receivable, collections accruing to the...

  17. 48 CFR 970.0404-3 - Responsibilities of contracting officers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Responsibilities of contracting officers. 970.0404-3 Section 970.0404-3 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970...

  18. Does Competitive Sourcing Really Pay?

    DTIC Science & Technology

    2007-04-30

    Governance by contract: Constitutional vision; Time for reflection and choice (Accepted paper.) Public Contract Law Journal, 33(2), p. 24-29. Washington, DC...Public Contract Law Journal, 33(2), 295-296. Washington, DC: The George Washington University Law School. Retrieved from http://ssrn.com/abstract

  19. 13 CFR 125.19 - When may a contracting officer set-aside a procurement for SDVO SBCs?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... made at fair market price. Effective Date Note: At 75 FR 62281, Oct. 7, 2010, § 125.19 was amended by... market prices. This requirement does not preclude a contracting officer from setting aside a contract... fair market prices. However, after conducting market research, the contracting officer shall first...

  20. 48 CFR 970.1504-1-1 - Fees for management and operating contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Fees for management and operating contracts. 970.1504-1-1 Section 970.1504-1-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504-1-1 Fees for management and...

  1. 7 CFR 1450.211 - BCAP contract.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP ASSISTANCE PROGRAM (BCAP) Establishment... biomass conversion facility does not become fully or partially operational. (g) Contracts may be...

  2. 7 CFR 1450.211 - BCAP contract.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP ASSISTANCE PROGRAM (BCAP) Establishment... biomass conversion facility does not become fully or partially operational. (g) Contracts may be...

  3. 7 CFR 1450.211 - BCAP contract.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP ASSISTANCE PROGRAM (BCAP) Establishment... biomass conversion facility does not become fully or partially operational. (g) Contracts may be...

  4. 7 CFR 1450.211 - BCAP contract.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS BIOMASS CROP ASSISTANCE PROGRAM (BCAP) Establishment... biomass conversion facility does not become fully or partially operational. (g) Contracts may be...

  5. 48 CFR 970.2305-4 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract clause. 970.2305-4 Section 970.2305-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2305-4...

  6. 48 CFR 970.2305-4 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contract clause. 970.2305-4 Section 970.2305-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2305-4...

  7. 48 CFR 970.2305-4 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contract clause. 970.2305-4 Section 970.2305-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2305-4...

  8. 48 CFR 970.2305-4 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contract clause. 970.2305-4 Section 970.2305-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2305-4...

  9. 48 CFR 970.2305-4 - Solicitation provision and contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contract clause. 970.2305-4 Section 970.2305-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2305-4...

  10. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  11. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  12. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  13. 48 CFR 915.404-4-71-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... awarded a DOE construction or construction management contract shall be paid a profit or fee if requested or solicited. The profit or fee objective for a construction or construction management contract... construction management contracts shall be established in accordance with the appropriate procedures and...

  14. 48 CFR 970.5222-2 - Overtime management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Overtime management. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5222-2 Overtime management. As prescribed in 970.2201-2-2...

  15. 48 CFR 970.5222-2 - Overtime management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Overtime management. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5222-2 Overtime management. As prescribed in 970.2201-2-2...

  16. 48 CFR 970.5222-2 - Overtime management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Overtime management. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5222-2 Overtime management. As prescribed in 970.2201-2-2...

  17. 48 CFR 970.5203-1 - Management controls.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Management controls. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5203-1 Management controls. As prescribed in 970.0370-2(a...

  18. 48 CFR 970.5222-2 - Overtime management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Overtime management. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5222-2 Overtime management. As prescribed in 970.2201-2-2...

  19. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  20. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  1. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  2. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  3. 48 CFR 970.5222-2 - Overtime management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Overtime management. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5222-2 Overtime management. As prescribed in 970.2201-2-2...

  4. 48 CFR 217.7103-2 - Period of agreement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....7103-2 Section 217.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for.... (c) Cancellation of a master agreement does not affect the rights and liabilities under any job order...

  5. 48 CFR 217.7103-2 - Period of agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....7103-2 Section 217.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for.... (c) Cancellation of a master agreement does not affect the rights and liabilities under any job order...

  6. 48 CFR 217.7103-2 - Period of agreement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....7103-2 Section 217.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for.... (c) Cancellation of a master agreement does not affect the rights and liabilities under any job order...

  7. 48 CFR 217.7103-2 - Period of agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....7103-2 Section 217.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for.... (c) Cancellation of a master agreement does not affect the rights and liabilities under any job order...

  8. 48 CFR 217.7103-2 - Period of agreement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ....7103-2 Section 217.7103-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Master Agreement for.... (c) Cancellation of a master agreement does not affect the rights and liabilities under any job order...

  9. 48 CFR 915.305 - Proposal evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 915.305 Proposal evaluation. (d... personnel will be required to comply with DOE conflict of interest and nondisclosure requirements. ...

  10. 41 CFR 304-6.9 - Does acceptance by OGE of the Standard Form (SF) 326 constitute a determination by OGE that the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... or a concurrence by OGE in the agency's conflict of interest analysis? 304-6.9 Section 304-6.9 Public Contracts and Property Management Federal Travel Regulation System PAYMENT OF TRAVEL EXPENSES FROM A NON... 41 Public Contracts and Property Management 4 2011-07-01 2011-07-01 false Does acceptance by OGE...

  11. 41 CFR 304-5.3 - What does our approving official need to consider before authorizing acceptance of payment from a...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 4 2010-07-01 2010-07-01 false What does our approving... expenses for a meeting? 304-5.3 Section 304-5.3 Public Contracts and Property Management Federal Travel... relevant considerations, including but not limited to the— (1) Identity of the non-Federal source; (2...

  12. 26 CFR 1.7702B-2 - Special rules for pre-1997 long-term care insurance contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... treated as a qualified long-term care insurance contract. Example 2. (i) The facts are the same as in Example 1, except that the insurance coverage under the contract does not become effective until March 1.... Example 3. (i) B, an individual, is the policyholder under a long-term care insurance contract purchased...

  13. 48 CFR 970.5235-1 - Federally funded research and development center sponsoring agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses for Management and Operating Contracts 970.5235-1... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Federally funded research...

  14. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  15. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  16. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  17. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  18. 48 CFR 970.2306 - Suspension of payments, termination of contract, and debarment and suspension actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free Work Place 970.2306 Suspension of payments, termination of contract, and debarment and...

  19. 48 CFR 915.607 - Criteria for acceptance and negotiation of an unsolicited proposal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... and negotiation of an unsolicited proposal. 915.607 Section 915.607 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 915.607 Criteria for acceptance and negotiation of an unsolicited proposal. (c) DOE's cost...

  20. 48 CFR 915.607 - Criteria for acceptance and negotiation of an unsolicited proposal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and negotiation of an unsolicited proposal. 915.607 Section 915.607 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 915.607 Criteria for acceptance and negotiation of an unsolicited proposal. (c) DOE's cost...

  1. 48 CFR 915.607 - Criteria for acceptance and negotiation of an unsolicited proposal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... and negotiation of an unsolicited proposal. 915.607 Section 915.607 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 915.607 Criteria for acceptance and negotiation of an unsolicited proposal. (c) DOE's cost...

  2. 48 CFR 915.607 - Criteria for acceptance and negotiation of an unsolicited proposal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and negotiation of an unsolicited proposal. 915.607 Section 915.607 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 915.607 Criteria for acceptance and negotiation of an unsolicited proposal. (c) DOE's cost...

  3. 48 CFR 915.607 - Criteria for acceptance and negotiation of an unsolicited proposal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... and negotiation of an unsolicited proposal. 915.607 Section 915.607 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 915.607 Criteria for acceptance and negotiation of an unsolicited proposal. (c) DOE's cost...

  4. Performance Contracting: Taking School Technology Green

    ERIC Educational Resources Information Center

    Taival, Dane

    2009-01-01

    Energy efficiency makes fiscal and environmental sense, and so does energy savings performance contracting. Because an energy savings performance contract can create a self-funding package of products and services that reduce energy and operating costs, over time, school districts' sometimes-large initial investment in emerging technologies saves…

  5. Patient Perception of Disclosure Performance of Informed Consent Elements in the Preanesthesia Interview

    DTIC Science & Technology

    1997-12-01

    Tort Law............................................................................................................................10 Contract Law ......................................................................................................................20... contract law ..............................22 Figure 3. Military status of patients by rate...Two major areas of the law, tort law and contract law , are relevant when a patient does not receive adequate informed consent. This chapter will

  6. Incidence angle bounds for lip flow separation of three 13.97-centimeter-diameter inlets

    NASA Technical Reports Server (NTRS)

    Luidens, R. W.; Abbott, J. M.

    1976-01-01

    Low speed wind tunnel tests were conducted to establish a procedure for determining inlet-lip flow separation and to make preliminary examination of the incidence angle bounds for lip flow separation on inlets intended for the nacelles of STOL (short takeoff and landing) aircraft. Three inlets were tested. Two of the inlets had short centerbodies with lower lip area contraction ratios of 1.30 and 1.44. The third inlet had a cylindrical centerbody extended forward into the inlet throat with a lower lip area contraction ratio of 1.44. The inlets were sized to fit a 13.97 centimeter-diameter fan. For inlet throat Mach numbers less than about 0.43, the lip flow separation angle was increased by either increasing the ratio of throat velocity to freestream velocity (Vt/Vo) or by increasing the lower lip area contraction ratio. For throat Mach numbers greater than a certain value (ranging from 0.43 to 0.52), increasing throat Mach number in some cases resulted in a decrease in the lip flow separation angle. Extending a cylindrical centerbody into the inlet throat increased the flow separation angle for nearly all values of Vt/Vo.

  7. 41 CFR 60-250.21 - Prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Prohibitions. 60-250.21 Section 60-250.21 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  8. 41 CFR 60-250.21 - Prohibitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Prohibitions. 60-250.21 Section 60-250.21 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  9. 41 CFR 60-250.80 - Recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Recordkeeping. 60-250.80 Section 60-250.80 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  10. 41 CFR 60-250.21 - Prohibitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Prohibitions. 60-250.21 Section 60-250.21 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  11. 41 CFR 60-300.21 - Prohibitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Prohibitions. 60-300.21 Section 60-300.21 Public Contracts and Property Management Other Provisions Relating to Public Contracts... VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS...

  12. 41 CFR 60-300.21 - Prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Prohibitions. 60-300.21 Section 60-300.21 Public Contracts and Property Management Other Provisions Relating to Public Contracts... VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS...

  13. 41 CFR 60-250.80 - Recordkeeping

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Recordkeeping 60-250.80 Section 60-250.80 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  14. 41 CFR 60-250.3 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false [Reserved] 60-250.3 Section 60-250.3 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  15. 41 CFR 60-250.21 - Prohibitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Prohibitions. 60-250.21 Section 60-250.21 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  16. 41 CFR 60-300.21 - Prohibitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Prohibitions. 60-300.21 Section 60-300.21 Public Contracts and Property Management Other Provisions Relating to Public Contracts... VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS...

  17. 41 CFR 60-300.3 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true [Reserved] 60-300.3 Section 60-300.3 Public Contracts and Property Management Other Provisions Relating to Public Contracts... VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS...

  18. 41 CFR 60-250.3 - [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true [Reserved] 60-250.3 Section 60-250.3 Public Contracts and Property Management Other Provisions Relating to Public Contracts... DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, RECENTLY SEPARATED VETERANS, AND OTHER PROTECTED VETERANS...

  19. 41 CFR 60-300.3 - [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false [Reserved] 60-300.3 Section 60-300.3 Public Contracts and Property Management Other Provisions Relating to Public Contracts... VETERANS, RECENTLY SEPARATED VETERANS, OTHER PROTECTED VETERANS, AND ARMED FORCES SERVICE MEDAL VETERANS...

  20. 48 CFR 16.601 - Time-and-materials contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... awarded without adequate price competition (see 15.403-1(c)(1)), the contract shall specify separate fixed...-Commercial Item Acquisitions With Adequate Price Competition, in solicitations contemplating use of a Time... based on adequate price competition. If authorized by agency procedures, the contracting officer may...

  1. Office of Inspector General report on special audit of pension plans for Department of Energy contract employees of the University of California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-08-01

    On May 15, 1996, the Department of Energy (DOE) announced its decision to extend and renegotiate its contracts with the University of California for the management and operation of the Los Alamos, Lawrence Berkeley, and Lawrence Livermore National Laboratories. Current contracts for the operation of these laboratories expire in 1997. The renegotiation process provides an opportunity for the Department to: (1) recover at least $620 million in excess assets from the pension plans it has funded for University of California employees who work at DOE`s laboratories; and (2) improve the Department`s ability to exercise prudent management of its interest inmore » those pension funds. According to Department records, as of July 1, 1995, the University of California Retirement Plan had between $620 million and $2.0 billion in excess assets that were attributable to the Department of Energy (emphasis supplied). The wide variation in excess assets is a function of the assumptions used in making these calculations. These are described in Appendix 1 to this report. It was concluded as a result of the audit that, as part of the contract renegotiation process, the Department should obtain the cooperation and assistance of the University of California in recovering excess pension plan assets in a manner that does not affect the defined retirement benefits of the contract employees. This could include jointly sponsoring legislation to modify any existing legal restrictions.« less

  2. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  3. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  4. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  5. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  6. 48 CFR 970.3770 - Facilities management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  7. 25 CFR 900.110 - What does this subpart cover?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT... contracts under this subpart are: design and architectural/engineering services, construction project...

  8. Ejection Fraction: What Does It Measure?

    MedlinePlus

    ... does the term "ejection fraction" mean? What does it measure? Answers from Rekha Mankad, M.D. Ejection fraction ... percentage of blood leaving your heart each time it contracts. During each heartbeat pumping cycle, the heart ...

  9. Streaked X Ray Spectra from Polar Direct Drive Capsules with an Equatorial Defect

    NASA Astrophysics Data System (ADS)

    Murphy, T. J.; Bradley, P. A.; Cobble, J. A.; Hsu, S. C.; Krasheninnikova, N. S.; Magelssen, G. R.; Schmitt, M. J.; Tregillis, I. L.; Wysocki, F. J.

    2011-10-01

    In the Defect Implosion Experiment (DIME) on Omega, capsules with an equatorial ``trench'' defect have been imploded to study defect-induced mix processes. The capsules contain layers doped with titanium and/or vanadium, with doped layers in contact with the deuterium fill gas on some targets, and separated from the gas by a layer of undoped plastic in others. Streaked x-ray spectra from the capsule implosions provide information on conditions in the mix layer. Polar direct drive was utilized in preparation for experiments planned for the National Ignition Facility in 2012. This work is supported by US DOE/NNSA, performed at LANL, operated by LANS LLC under contract DE-AC52-06NA25396.

  10. Fabrication and Characterization of Magnetic Nanowires in Anodic Alumina

    NASA Astrophysics Data System (ADS)

    Xiao, Z. L.; Han, Y. R.; Wang, H. H.; Welp, U.; Kwok, W. K.; Crabtree, G. W.

    2002-03-01

    Magnetic nanowires (cobalt, iron and nickel) with diameters down to 20 nm have been fabricated by electrodeposition. Both commercial and home-made anodized aluminum oxide (AAO) membranes with nanochannel arrays were used as templates. The structure and magnetization hysteresis of the specimens with nanowires were investigated with scanning electron microscope (SEM) and superconducting quantum interference device (SQUID), respectively. Growth of nanowires with both aqueous and dimethylsulfoxide (DMSO) solutions was conducted and better quality nanowires were obtained with the organic DMSO solution. The influence of the diameter, the length and the separation of the nanochannels on the magnetization orientation was investigated in detail. Work supported by the US Department of Energy (DOE), BES-Materials Science, Contract No. W-31-109-ENG-38.

  11. The chemical enhancement of the triboelectric separation of coal from pyrite and ash: A novel approach for electrostatic separation of mineral matter from coal. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gustafson, R.M.; DiMare, S.; Sabatini, J.

    1992-02-01

    Arthur D. Little, Inc., under contract to the US DOE Pittsburgh Energy Technology Center, has developed a triboelectric separation device for coal beneficiation, that employs an entrained-flow, rotating-cylinder concept. The described apparatus has been used to test the efficacy of chemical pretreatment and in-situ treatment of coal on separation efficiency. Coal particle entrainment is achieved with gaseous carbon dioxide and particle collection is accomplished by an electrostatic plate separator. The triboelectric separation device incorporates instrumentation for the direct measurement of charge in the dilute-phase particle stream. Some of the pretreatment materials investigated under this project to modify the surface chargingmore » characteristics of the coal included oleic acid, sodium oleate, quinoline and dicyclohexylamine. Ammonia and sulfur dioxide at a concentration up to 1000 ppM was used for in-situ treatment of the coal, with carbon dioxide as the carrier/inerting gas. Nitrogen was used earlier in the test program as the carrier/inerting gas for the coal, but a severe arcing problem was encountered in the electrostatic collector with nitrogen as the carrier gas. This problem did not occur when carbon dioxide was used. The report covers the chemical treatment employed, and summarizes and interprets the results achieved. In addition, an economic analysis of a full scale system based on this concept is presented.« less

  12. 48 CFR 2532.403 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... analysis of the financing required by the contractor for the contract and does not exceed reasonable financial requirements between payments, and (b) such advance payment is appropriate in order to contract...

  13. 48 CFR 2532.403 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... analysis of the financing required by the contractor for the contract and does not exceed reasonable financial requirements between payments, and (b) such advance payment is appropriate in order to contract...

  14. 75 FR 3187 - Defense Federal Acquisition Regulation Supplement: Inflation Adjustment of Acquisition-Related...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Davis-Bacon Act, Service Contract Act, and trade agreements thresholds. This case also reviews... Contract Act, and trade agreements thresholds. This case also reviews nonstatutory DFARS acquisition... Davis Bacon Act, the Service Contract Act, or trade agreements. The statute does not authorize DoD to...

  15. 48 CFR 22.1003-2 - Geographical coverage of the Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Service Contract Act of 1965, as Amended 22.1003-2 Geographical coverage of the Act. The Act applies to service contracts performed in the United States (see 22.1001). The Act does not apply to contracts performed outside the...

  16. 48 CFR 22.1003-3 - Statutory exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Service Contract Act of 1965, as Amended 22.1003-3 Statutory exemptions. The Act does not apply to— (a) Any contract for construction... required to be done in accordance with the provisions of the Walsh-Healey Public Contracts Act (41 U.S.C...

  17. 48 CFR 22.1008-1 - Obtaining wage determinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determinations using the WDOL website. Contracting officers may also use the Department of Labor's e98 electronic... Labor. If the WDOL database does not contain the applicable prevailing wage determination for a contract action, the contracting officer must use the e98 process to request a wage determination from the...

  18. 48 CFR 14.408-4 - Economic price adjustment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Economic price adjustment... CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 14.408-4 Economic price adjustment. (a) Bidder proposes economic price adjustment. (1) When a solicitation does not...

  19. 48 CFR 14.408-4 - Economic price adjustment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Economic price adjustment... CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 14.408-4 Economic price adjustment. (a) Bidder proposes economic price adjustment. (1) When a solicitation does not...

  20. 48 CFR 14.408-4 - Economic price adjustment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Economic price adjustment... CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 14.408-4 Economic price adjustment. (a) Bidder proposes economic price adjustment. (1) When a solicitation does not...

  1. 48 CFR 14.408-4 - Economic price adjustment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Economic price adjustment... CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 14.408-4 Economic price adjustment. (a) Bidder proposes economic price adjustment. (1) When a solicitation does not...

  2. 48 CFR 14.408-4 - Economic price adjustment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Economic price adjustment... CONTRACTING METHODS AND CONTRACT TYPES SEALED BIDDING Opening of Bids and Award of Contract 14.408-4 Economic price adjustment. (a) Bidder proposes economic price adjustment. (1) When a solicitation does not...

  3. 39 CFR 601.109 - Contract claims and disputes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: INTELLECTUAL PROPERTY RIGHTS OTHER THAN PATENTS PURCHASING OF PROPERTY AND SERVICES § 601.109 Contract claims... decision on a claim, and even when the supplier does not agree to use ADR, the contracting officer should... issuance of a final decision. (c) Supplier claim initiation. Supplier claims must be submitted in writing...

  4. 24 CFR 982.607 - Congregate housing: Lease and HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Congregate housing: Lease and HAP... Types Congregate Housing § 982.607 Congregate housing: Lease and HAP contract. For congregate housing, there is a separate lease and HAP contract for each assisted family. ...

  5. 48 CFR 52.232-30 - Installment Payments for Commercial Items.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contract line item. For example, if the first scheduled delivery of any separately priced unit of a... REGULATION (CONTINUED) CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and... financing payments. The Contractor may request, and the Government shall pay, a contract financing...

  6. 75 FR 880 - New Postal Product

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ...: January 6, 2010. ADDRESSES: Submit comments electronically via the Commission's Filing Online system at... financial documentation is included with this filing as a separate Excel file. Id. at 2. \\4\\ The contract at... contract, the present contract ``allows the customer to tender items that meet the requirements for Canada...

  7. 48 CFR 970.2305 - Workplace substance abuse programs-management and operating contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety and Drug-Free...

  8. 25 CFR 273.11 - Eligible applicants.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.11 Eligible applicants... does not operate education programs authorized to be contracted under the Johnson-O'Malley Act. However...

  9. 25 CFR 273.11 - Eligible applicants.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.11 Eligible applicants... does not operate education programs authorized to be contracted under the Johnson-O'Malley Act. However...

  10. 25 CFR 273.11 - Eligible applicants.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.11 Eligible applicants... does not operate education programs authorized to be contracted under the Johnson-O'Malley Act. However...

  11. 25 CFR 273.11 - Eligible applicants.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.11 Eligible applicants... does not operate education programs authorized to be contracted under the Johnson-O'Malley Act. However...

  12. 25 CFR 273.11 - Eligible applicants.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROGRAM EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT Application Process § 273.11 Eligible applicants... does not operate education programs authorized to be contracted under the Johnson-O'Malley Act. However...

  13. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371 Conduct of employees of DOE...

  14. 48 CFR 904.7004 - Findings, determination, and contract award or termination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... that award of a contract to an offeror(s) or continued performance of a contract by a contractor will... types of plans that a contractor can propose are: measures which provide for physical or organizational separation of the facility or organizational component containing the classified information or special...

  15. 24 CFR 982.616 - Shared housing: Lease and HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Shared housing: Lease and HAP... Types Shared Housing § 982.616 Shared housing: Lease and HAP contract. For assistance in a shared housing unit, there is a separate HAP contract and lease for each assisted family. ...

  16. 48 CFR 41.205 - Separate contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following information: (1) The number of available suppliers. (2) Any special equipment, service reliability... termination liability. (4) Total estimated contract value (including costs in subparagraphs (b) (2) and (3) of...

  17. Whole-body vibration does not influence knee joint neuromuscular function or proprioception.

    PubMed

    Hannah, R; Minshull, C; Folland, J P

    2013-02-01

    This study examined the acute effects of whole-body vibration (WBV) on knee joint position sense and indices of neuromuscular function, specifically strength, electromechanical delay and the rate of force development. Electromyography and electrically evoked contractions were used to investigate neural and contractile responses to WBV. Fourteen healthy males completed two treatment conditions on separate occasions: (1) 5 × 1 min of unilateral isometric squat exercise on a synchronous vibrating platform [30 Hz, 4 mm peak-to-peak amplitude] (WBV) and (2) a control condition (CON) of the same exercise without WBV. Knee joint position sense (joint angle replication task) and quadriceps neuromuscular function were assessed pre-, immediately-post and 1 h post-exercise. During maximum voluntary knee extensions, the peak force (PF(V)), electromechanical delay (EMD(V)), rate of force development (RFD(V)) and EMG of the quadriceps were measured. Twitch contractions of the knee extensors were electrically evoked to assess EMD(E) and RFD(E). The results showed no influence of WBV on knee joint position, EMD(V), PF(V) and RFD(V) during the initial 50, 100 or 150 ms of contraction. Similarly, electrically evoked neuromuscular function and neural activation remained unchanged following the vibration exercise. A single session of unilateral WBV did not influence any indices of thigh muscle neuromuscular performance or knee joint proprioception. © 2011 John Wiley & Sons A/S.

  18. Asset Allocation and Optimal Contract for Delegated Portfolio Management

    NASA Astrophysics Data System (ADS)

    Liu, Jingjun; Liang, Jianfeng

    This article studies the portfolio selection and the contracting problems between an individual investor and a professional portfolio manager in a discrete-time principal-agent framework. Portfolio selection and optimal contracts are obtained in closed form. The optimal contract was composed with the fixed fee, the cost, and the fraction of excess expected return. The optimal portfolio is similar to the classical two-fund separation theorem.

  19. FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Arnaldo Frydman

    It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the process efficiency and environmental impact performance of fossil fuel utilization. GE Global Research has developed an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP module offers the potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions including NO{sub x}. GE Global Research (prime contractor) wasmore » awarded a contract from U.S. DOE NETL to develop the UFP technology. Work on this Phase I program started on October 1, 2000. The project team includes GE Global Research, Southern Illinois University at Carbondale (SIU-C), California Energy Commission (CEC), and T. R. Miles, Technical Consultants, Inc. In the UFP technology, coal and air are simultaneously converted into separate streams of (1) high-purity hydrogen that can be utilized in fuel cells or turbines, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure vitiated air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on ASPEN Plus process modeling, has an estimated process efficiency of 6 percentage points higher than IGCC with conventional CO{sub 2} separation. The current R&D program will determine the feasibility of the integrated UFP technology through pilot-scale testing, and will investigate operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates experimental testing, modeling and economic studies to demonstrate the UFP technology. This is the fourteenth quarterly technical progress report for the UFP program, which is supported by U.S. DOE NETL (Contract No. DE-FC26-00FT40974) and GE. This report summarizes program accomplishments for the period starting January 1, 2004 and ending March 31, 2004. The report includes an introduction summarizing the UFP technology, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab-scale experimental testing, pilot-scale shakedown and performance testing, program management and technology transfer.« less

  20. FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Arnaldo Frydman

    It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the process efficiency and environmental impact performance of fossil fuel utilization. GE Global Research (GEGR) has developed an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP module offers the potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions including NO{sub x}. GEGR (prime contractor) was awardedmore » a contract from U.S. DOE NETL to develop the UFP technology. Work on this Phase I program started on October 1, 2000. The project team includes GEGR, Southern Illinois University at Carbondale (SIU-C), California Energy Commission (CEC), and T. R. Miles, Technical Consultants, Inc. In the UFP technology, coal and air are simultaneously converted into separate streams of (1) high-purity hydrogen that can be utilized in fuel cells or turbines, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure vitiated air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on Aspen Plus process modeling, has an estimated process efficiency of 6% higher than IGCC with conventional CO{sub 2} separation. The current R&D program will determine the feasibility of the integrated UFP technology through pilot-scale testing, and will investigate operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates experimental testing, modeling and economic studies to demonstrate the UFP technology. This is the third annual technical progress report for the UFP program supported by U.S. DOE NETL (Contract No. DE-FC26-00FT40974). This report summarizes program accomplishments for the period starting October 1, 2002 and ending September 30, 2003. The report includes an introduction summarizing the UFP technology, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab-scale experimental testing, bench-scale experimental testing, process modeling, pilot-scale system design and assembly, and program management.« less

  1. FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Arnaldo Frydman

    It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the process efficiency and environmental impact performance of fossil fuel utilization. GE Global Research has developed an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP module offers the potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions including NO{sub x}. GE Global Research (prime contractor) wasmore » awarded a contract from U.S. DOE NETL to develop the UFP technology. Work on this Phase I program started on October 1, 2000. The project team includes GE Global Research, Southern Illinois University at Carbondale (SIU-C), California Energy Commission (CEC), and T. R. Miles, Technical Consultants, Inc. In the UFP technology, coal and air are simultaneously converted into separate streams of (1) high-purity hydrogen that can be utilized in fuel cells or turbines, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure vitiated air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on ASPEN Plus process modeling, has an estimated process efficiency of 6% higher than IGCC with conventional CO{sub 2} separation. The current R&D program will determine the feasibility of the integrated UFP technology through pilot-scale testing, and will investigate operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrates experimental testing, modeling and economic studies to demonstrate the UFP technology. This is the thirteenth quarterly technical progress report for the UFP program, which is supported by U.S. DOE NETL under Contract No. DE-FC26-00FT40974. This report summarizes program accomplishments for the period starting October 1, 2003 and ending December 31, 2003. The report includes an introduction summarizing the UFP technology, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab-scale experimental testing, pilot-scale assembly, pilot-scale demonstration and program management and technology transfer.« less

  2. FUEL-FLEXIBLE GASIFICATION-COMBUSTION TECHNOLOGY FOR PRODUCTION OF H2 AND SEQUESTRATION-READY CO2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    George Rizeq; Janice West; Arnaldo Frydman

    It is expected that in the 21st century the Nation will continue to rely on fossil fuels for electricity, transportation, and chemicals. It will be necessary to improve both the process efficiency and environmental impact performance of fossil fuel utilization. GE Global Research has developed an innovative fuel-flexible Unmixed Fuel Processor (UFP) technology to produce H{sub 2}, power, and sequestration-ready CO{sub 2} from coal and other solid fuels. The UFP module offers the potential for reduced cost, increased process efficiency relative to conventional gasification and combustion systems, and near-zero pollutant emissions including NO{sub x}. GE Global Research (prime contractor) wasmore » awarded a contract from U.S. DOE NETL to develop the UFP technology. Work on this Phase I program started on October 1, 2000. The project team includes GE Global Research, Southern Illinois University at Carbondale (SIU-C), California Energy Commission (CEC), and T. R. Miles, Technical Consultants, Inc. In the UFP technology, coal and air are simultaneously converted into separate streams of (1) high-purity hydrogen that can be utilized in fuel cells or turbines, (2) sequestration-ready CO{sub 2}, and (3) high temperature/pressure vitiated air to produce electricity in a gas turbine. The process produces near-zero emissions and, based on ASPEN Plus process modeling, has an estimated process efficiency of 6 percentage points higher than IGCC with conventional CO{sub 2} separation. The current R&D program has determined the feasibility of the integrated UFP technology through pilot-scale testing, and investigated operating conditions that maximize separation of CO{sub 2} and pollutants from the vent gas, while simultaneously maximizing coal conversion efficiency and hydrogen production. The program integrated experimental testing, modeling and economic studies to demonstrate the UFP technology. This is the fifteenth quarterly technical progress report for the UFP program, which is supported by U.S. DOE NETL (Contract No. DE-FC26-00FT40974) and GE. This report summarizes program accomplishments for the period starting April 1, 2004 and ending June 30, 2004. The report includes an introduction summarizing the UFP technology, main program tasks, and program objectives; it also provides a summary of program activities and accomplishments covering progress in tasks including lab-scale experimental testing, pilot-scale testing, kinetic modeling, program management and technology transfer.« less

  3. 10 CFR 733.5 - Allegations received by DOE.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Allegations received by DOE. 733.5 Section 733.5 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.5 Allegations received by DOE. If DOE receives directly a written allegation of research misconduct with regard to research under a DOE contract or...

  4. 10 CFR 733.5 - Allegations received by DOE.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Allegations received by DOE. 733.5 Section 733.5 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.5 Allegations received by DOE. If DOE receives directly a written allegation of research misconduct with regard to research under a DOE contract or...

  5. 10 CFR 733.5 - Allegations received by DOE.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Allegations received by DOE. 733.5 Section 733.5 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.5 Allegations received by DOE. If DOE receives directly a written allegation of research misconduct with regard to research under a DOE contract or...

  6. 10 CFR 733.5 - Allegations received by DOE.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Allegations received by DOE. 733.5 Section 733.5 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.5 Allegations received by DOE. If DOE receives directly a written allegation of research misconduct with regard to research under a DOE contract or...

  7. 10 CFR 733.5 - Allegations received by DOE.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Allegations received by DOE. 733.5 Section 733.5 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.5 Allegations received by DOE. If DOE receives directly a written allegation of research misconduct with regard to research under a DOE contract or...

  8. DOE Zero Energy Ready Home Case Study: Greenhill Contracting, Inc., Hickory Ridge

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pacific Northwest National Laboratory

    Greenhill Contracting built this 3,912-ft2 house in Gardiner, New York, to the high-performance criteria of the DOE Zero Energy Ready Home (ZERH) program. A highly efficient air-source heat pump heats and cools the home’s interior, while the roof-mounted photovoltaic system offsets electricity usage to cut energy bills to nearly zero. Many months the home owners see a credit on their utility bill.

  9. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the Indian tribe or tribal organization is contracting solely to perform construction management... of a self-determination construction contract? 900.131 Section 900.131 Indians BUREAU OF INDIAN... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role...

  10. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Indian tribe or tribal organization is contracting solely to perform construction management... of a self-determination construction contract? 900.131 Section 900.131 Indians BUREAU OF INDIAN... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role...

  11. 25 CFR 900.131 - What role does the Secretary play during the performance of a self-determination construction...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the Indian tribe or tribal organization is contracting solely to perform construction management... of a self-determination construction contract? 900.131 Section 900.131 Indians BUREAU OF INDIAN... CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.131 What role...

  12. 13 CFR 126.607 - When must a contracting officer set aside a requirement for qualified HUBZone SBCs?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... fair market prices. This requirement does not preclude a contracting officer from setting aside a... will be made at fair market prices. However, after conducting market research, the contracting officer... to support the specific set-aside, including the type and extent of market research conducted. In...

  13. 49 CFR 32.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... receive? 32.115 Section 32.115 Transportation Office of the Secretary of Transportation GOVERNMENTWIDE... the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as described in § 32. 510(c...

  14. 49 CFR 32.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... receive? 32.115 Section 32.115 Transportation Office of the Secretary of Transportation GOVERNMENTWIDE... the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as described in § 32. 510(c...

  15. 49 CFR 32.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... receive? 32.115 Section 32.115 Transportation Office of the Secretary of Transportation GOVERNMENTWIDE... the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as described in § 32. 510(c...

  16. 49 CFR 32.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... receive? 32.115 Section 32.115 Transportation Office of the Secretary of Transportation GOVERNMENTWIDE... the Federal contracts that I receive? It will affect future contract awards indirectly if you are debarred or suspended for a violation of the requirements of this part, as described in § 32. 510(c...

  17. What Does the Student Psychological Contract Mean? Evidence from a UK Business School

    ERIC Educational Resources Information Center

    Koskina, Aikaterini

    2013-01-01

    Much has been written about psychological contracts in organisational contexts but very little in educational settings, especially within higher education. Using an exploratory single case study this article provides qualitative empirical evidence about the ways in which the psychological contract is perceived by a group of postgraduate students…

  18. Communication between functional and denervated muscles using radiofrequency.

    PubMed

    Jacob, Doreen K; Stefko, Susan Tonya; Hackworth, Steven A; Lovell, Michael R; Mickle, Marlin H

    2006-05-01

    This article focuses on establishing communication between a functional muscle and a denervated muscle using a radiofrequency communications link. The ultimate objective of the project is to restore the eye blink in patients with facial nerve paralysis. Two sets of experiments were conducted using the gastrocnemius leg muscles of Sprague-Dawley rats. In the initial tests, varying magnitudes of voltages ranging from 0.85 to 2.5 V were applied directly to a denervated muscle to determine the voltage required to produce visible contraction. The second set of experiments was then conducted to determine the voltage output from an in vivo muscle contraction that could be sensed and used to coordinate a signal for actuation of a muscle in a separate limb. After designing the appropriate external communication circuitry, a third experiment was performed to verify that a signal between a functional and a denervated muscle can be generated and used as a stimulus. Voltages below 2 V at a 10-millisecond pulse width elicited a gentle, controlled contraction of the denervated muscle in vivo. It was also observed that with longer pulse widths, higher stimulation voltages were required to produce sufficient contractions. It is possible to detect contraction of a muscle, use this to generate a signal to an external base station, and subsequently cause a separate, denervated muscle to contract in response to the signal. This demonstration in vivo of a signaling system for pacing of electrical stimulation of 1 muscle to spontaneous contraction of another, separate muscle, using radiofrequency communication without direct connection, may be used in numerous ways to overcome nerve damage.

  19. 7 CFR 3015.193 - Other non-profit organizations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... contracts, and other contracts in which costs are used in pricing, administration, or settlement. It does not apply to colleges or universities which are covered by Circular A-21; State, local and federally...

  20. 7 CFR 3015.193 - Other non-profit organizations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... contracts, and other contracts in which costs are used in pricing, administration, or settlement. It does not apply to colleges or universities which are covered by Circular A-21; State, local and federally...

  1. 7 CFR 3015.193 - Other non-profit organizations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... contracts, and other contracts in which costs are used in pricing, administration, or settlement. It does not apply to colleges or universities which are covered by Circular A-21; State, local and federally...

  2. 7 CFR 3015.193 - Other non-profit organizations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... contracts, and other contracts in which costs are used in pricing, administration, or settlement. It does not apply to colleges or universities which are covered by Circular A-21; State, local and federally...

  3. 7 CFR 3015.193 - Other non-profit organizations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... contracts, and other contracts in which costs are used in pricing, administration, or settlement. It does not apply to colleges or universities which are covered by Circular A-21; State, local and federally...

  4. 24 CFR 964.3 - Applicability and scope.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Public Housing Annual Contributions Contract (ACC) with HUD. This part, except for subpart E, does not... renegotiated contracts must meet the requirements of this part, the ACC and all applicable laws and regulations...

  5. 24 CFR 964.3 - Applicability and scope.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Public Housing Annual Contributions Contract (ACC) with HUD. This part, except for subpart E, does not... renegotiated contracts must meet the requirements of this part, the ACC and all applicable laws and regulations...

  6. Occlusion of pressor responses to posterior diencephalic stimulation and muscular contraction.

    PubMed

    Rybicki, K J; Stremel, R W; Iwamoto, G A; Mitchell, J H; Kaufman, M P

    1989-02-01

    Although neural occlusion has been suggested to occur between the central and reflex mechanisms increasing arterial pressure, evidence consistent with this phenomenon is lacking. To assess the possibility of neural occlusion we recorded, in chloralose-anesthetized cats, the pressor responses to statically contracting the hindlimb muscles and to electrically stimulating histologically confirmed sites in the posterior hypothalamus and subthalamus. We also recorded the pressor responses to topical application of capsaicin onto the intestine and to stimulation of these diencephalic sites. The pressor responses to simultaneous static contraction and diencephalic stimulation were significantly smaller than the algebraic sum of the pressor responses to contraction and diencephalic stimulation evoked separately. Likewise, the pressor responses to simultaneous capsaicin application and diencephalic stimulation were significantly smaller than the algebraic sum of the responses evoked separately. High intensity stimulation of the L7 dorsal root or the diencephalic sites evoked pressor responses similar in magnitude to the algebraic sum of the two responses evoked separately; thus, the inability of the simultaneous maneuvers to evoke pressor responses that summed algebraically was not due to the fact that they caused a maximal effect. Our findings are consistent with the hypothesis that neural occlusion occurs during stimulation of the posterior diencephalon and static muscular contraction.

  7. DOE New Technology: Sharing New Frontiers, April 1, 1993--September 30, 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tamura, A.T.; Henline, D.M.

    The purpose of DOE New Technology is to provide information on how to access specific technologies developed through research sponsored by DOE and performed by DOE laboratories or by DOE-contracted researchers. This document describes technologies identified as having potential for commercial applications in addition to a catalog of current patent applications and patents available for licensing from DOE and DOE contractors.

  8. 26 CFR 1.72-2 - Applicability of section.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... from an insurance company of one or more group contracts or one or more individual contracts, or may be... purchased a group annuity contract. The remaining part of the benefits are to be paid out of a separate... purchase of a group term insurance policy and funded the retirement benefits through the purchase of a...

  9. 48 CFR 952.219-70 - DOE Mentor-Protege program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOE Mentor-Protege program... FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 952.219-70 DOE Mentor.... DOE Mentor-Protege Program (MAY 2000) The Department of Energy has established a Mentor-Protege...

  10. [Progress of the ATM Crew}

    NASA Technical Reports Server (NTRS)

    Krabill, W. (Technical Monitor)

    2001-01-01

    Contract NAS5-99094 was initiated on December 1, 1998. The subject contract contains 5 tasks covering specific activities in support of 3 major sensor programs, each with a separate NASA Principal Investigator (PI). Accordingly, the bimonthly narrative is organized such that each of the programs are discussed separately with individual task activities presented within each of the programs. Acronyms are used throughout the report to keep the writing succinct. An attached glossary contains definitions for these acronyms.

  11. 41 CFR 102-3.180 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What does this subpart... by the National Academy of Sciences or the National Academy of Public Administration? § 102-3.180 What does this subpart cover and how does it apply? This subpart provides guidance to agencies on...

  12. 41 CFR 102-3.180 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 41 Public Contracts and Property Management 3 2012-01-01 2012-01-01 false What does this subpart... by the National Academy of Sciences or the National Academy of Public Administration? § 102-3.180 What does this subpart cover and how does it apply? This subpart provides guidance to agencies on...

  13. 41 CFR 102-3.180 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 41 Public Contracts and Property Management 3 2014-01-01 2014-01-01 false What does this subpart... by the National Academy of Sciences or the National Academy of Public Administration? § 102-3.180 What does this subpart cover and how does it apply? This subpart provides guidance to agencies on...

  14. 41 CFR 102-3.180 - What does this subpart cover and how does it apply?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 41 Public Contracts and Property Management 3 2013-07-01 2013-07-01 false What does this subpart... by the National Academy of Sciences or the National Academy of Public Administration? § 102-3.180 What does this subpart cover and how does it apply? This subpart provides guidance to agencies on...

  15. 41 CFR 102-75.660 - What happens if DOI does not approve any applications or does not submit an assignment...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... not approve any applications or does not submit an assignment recommendation? 102-75.660 Section 102-75.660 Public Contracts and Property Management Federal Property Management Regulations System... approve any applications or does not submit an assignment recommendation? If DOI does not approve any...

  16. The Applicability of Performance-Based Acquisition Techniques to Level-of-Effort Services Contracts

    DTIC Science & Technology

    2015-06-01

    Regulation Supplement (NMCARS) Change 13-05). However, there is a large category of services acquisitions that does not mesh well with PBA’s rationale...sampled, 19 contracts (38%) were not clearly identified as LOE or completion.9 Excluding the “not clear” category , 22 of the remaining 31 contracts...attention away from important elements. For example, several contracts focused on grammatical correctness of reports. Describing a complex services

  17. 48 CFR 1228.306-70 - Contracts for lease of aircraft.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contract for the lease of aircraft, except in the following circumstances: (1) When the hourly rental rate...: (2) When the cost of hull insurance does not exceed 10 percent of the contract rate; or (3) When the... or death of persons, or damage or loss of property unless the aircraft is in the actual possession or...

  18. 48 CFR 1228.306-70 - Contracts for lease of aircraft.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract for the lease of aircraft, except in the following circumstances: (1) When the hourly rental rate...: (2) When the cost of hull insurance does not exceed 10 percent of the contract rate; or (3) When the... or death of persons, or damage or loss of property unless the aircraft is in the actual possession or...

  19. 14 CFR 259.6 - Notice and contract of carriage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Web site shall post its Contract of Carriage on its Web site in easily accessible form, including all... Lengthy Tarmac Delays shall, if it has a Web site but does not include such Contingency Plan for Lengthy Tarmac Delays in its Contract of Carriage, post its Contingency Plan for Lengthy Tarmac Delays on its Web...

  20. 32 CFR 26.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... I receive? 26.115 Section 26.115 National Defense Department of Defense OFFICE OF THE SECRETARY OF... affect future contract awards indirectly if you are debarred or suspended for a violation of the... procurement contracts. The portion of the Drug-Free Workplace Act of 1988 that applies to Federal procurement...

  1. 32 CFR 26.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... I receive? 26.115 Section 26.115 National Defense Department of Defense OFFICE OF THE SECRETARY OF... affect future contract awards indirectly if you are debarred or suspended for a violation of the... procurement contracts. The portion of the Drug-Free Workplace Act of 1988 that applies to Federal procurement...

  2. 32 CFR 26.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... I receive? 26.115 Section 26.115 National Defense Department of Defense OFFICE OF THE SECRETARY OF... affect future contract awards indirectly if you are debarred or suspended for a violation of the... procurement contracts. The portion of the Drug-Free Workplace Act of 1988 that applies to Federal procurement...

  3. 32 CFR 26.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... I receive? 26.115 Section 26.115 National Defense Department of Defense OFFICE OF THE SECRETARY OF... affect future contract awards indirectly if you are debarred or suspended for a violation of the... procurement contracts. The portion of the Drug-Free Workplace Act of 1988 that applies to Federal procurement...

  4. 32 CFR 26.115 - Does this part affect the Federal contracts that I receive?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... I receive? 26.115 Section 26.115 National Defense Department of Defense OFFICE OF THE SECRETARY OF... affect future contract awards indirectly if you are debarred or suspended for a violation of the... procurement contracts. The portion of the Drug-Free Workplace Act of 1988 that applies to Federal procurement...

  5. 13 CFR 124.503 - How does SBA accept a procurement for award through the 8(a) BD program?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... market research, the contracting officer shall first consider a set-aside or sole source award (if the... market research conducted. In addition, the contracting officer must document the contract file showing... factors such as the results of market research, programmatic needs specific to the procuring agency...

  6. 14 CFR 259.6 - Notice and Contract of Carriage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Web site shall post its Contract of Carriage on its Web site in easily accessible form, including all... Lengthy Tarmac Delays shall, if it has a Web site but does not include such Contingency Plan for Lengthy Tarmac Delays in its Contract of Carriage, post its Contingency Plan for Lengthy Tarmac Delays on its Web...

  7. 24 CFR 401.99 - How does an owner request a section 8 contract renewal?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... section 8 contract renewal? (a) Requesting Restructuring Plan. An owner may request a section 8 contract renewal as part of a Restructuring Plan by, at least 3 months before the expiration date of any project... HUD of any pending suspension or debarment or other enforcement action, or, if so, a voluntary sale or...

  8. Interaction of a Synthetic Jet Actuator with a Severely Separated Crossflow

    NASA Astrophysics Data System (ADS)

    Jansen, Kenneth; Farnsworth, John; Rasquin, Michel; Rathay, Nick; Monastero, Marianne; Amitay, Michael

    2017-11-01

    A coordinated experimental/computational study of synthetic jet-based flow control on a vertical tail/rudder assembly has been carried out on a 1/19th scale model operating at 30 degree rudder deflection, 0 degree side slip, and 20m/s free-stream flow. Under these conditions a very strong span-wise separated flow develops over the rudder surface for a majority of its span. Twelve synthetic jets were distributed across the span of the vertical tail just upstream of the rudder hinge-line to determine their ability to reduce flow separation and thereby increase the side force production; to extend the rudder effectiveness. Experiments were completed for the baseline case (i.e. no jets blowing) and for cases where 1, 6, and 12 jets were activated. RANS and DDES computations were completed to match these four experiments. While some experimental results for the same geometry have been previously reported, more detailed results concerning the experiments and their comparison to the DDES computations for the baseline and 1 jet active cases are reported here. Specifically, this effort focuses on the near-jet flow and the phase-averaged vortical structures produced by a single jet interacting with a severely separated, turbulent cross-flow. An award of computer time was provided by the INCITE program and the Theta and Aurora ESP through ALCF which is supported by the DOE under Contract DE-AC02-06CH11357.

  9. 41 CFR 102-75.660 - What happens if DOI does not approve any applications or does not submit an assignment...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false What happens if DOI does... Disposal Property for Use As Public Park Or Recreation Areas § 102-75.660 What happens if DOI does not approve any applications or does not submit an assignment recommendation? If DOI does not approve any...

  10. 48 CFR 970.4302 - Changes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Changes. 970.4302 Section 970.4302 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contract Modifications 970.4302 Changes. ...

  11. Contract Specialist Turnover Rate and Contract Management Maturity in the National Capital Region Contracting Center: An Analysis

    DTIC Science & Technology

    2009-12-01

    interviews with separating employees to obtain this information (Mathis & Jackson, 2003, pp. 90-91). Management should also measure the ‘internal churn rate...Sullivan, 2009). This is a measure of internal transfers from one department to others. High internal churn rates in particular areas may...contracting support and service throughout the National Capital Region” (CCE, 2009). Among other things, CCE provides telecommunication equipment and

  12. Contract Procedure in an Agency Separated Products Explanation and Applied Process for Protection of the Personal Information

    NASA Astrophysics Data System (ADS)

    Terahama, Yukinori; Takahashi, Yoshiyasu; Suzuki, Shigeru; Kinukawa, Hiroshi

    Recent years, maintenance of corporate soundness and compliance with the law and corporate ethics are getting more significant in the insurance industry, regardless of life insurance. In the other hand, division of production and distribution is increasing. Therefore the problem of compliance with an agency is getting more significant. We propose a contract procedure in an agency separated products explanation and applied process for protection of the personal information. Our proposed procedure protects the personal information of the contractor and supports the compliance observance for contracts with the background texture watermarks and the redactable signature. We have developed a prototype system of the solution to check its feasibility.

  13. 17 CFR 210.12-12B - Open option contracts written.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Open option contracts written... § 210.12-12B Open option contracts written. [For management investment companies only] Col. A Col. B Col... Information as to put options shall be shown separately from information as to call options. 2 Options of an...

  14. 41 CFR 109-38.903-50 - Reporting DOE motor vehicle data.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Reporting DOE motor... AVIATION, TRANSPORTATION, AND MOTOR VEHICLES 38-MOTOR EQUIPMENT MANAGEMENT 38.9-Federal Motor Vehicle Fleet Report § 109-38.903-50 Reporting DOE motor vehicle data. (a) DOE offices and designated contractors...

  15. 48 CFR 970.0371-2 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-2 Applicability. The policies in this section are applicable to all DOE management and...

  16. More DoD Oversight Needed for Purchases Made Through the Department of Energy

    DTIC Science & Technology

    2010-12-03

    the selected servicing agency?  Will significant elements of the work be contracted out or be done in-house?  Is there a service fee /charge...the estimated cost and any fee of a cost- reimbursement contract. If the contract is incrementally funded, funds are obligated to cover the amount...allotted and any corresponding increment of fee . However, the FAR does not provide enough guidance on when contracts should be incrementally or fully

  17. 25 CFR 900.27 - If an Indian tribe or tribal organization elects to contract for a severable portion of a...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false If an Indian tribe or tribal organization elects to contract for a severable portion of a proposal, does the Indian tribe or tribal organization lose its... HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Declination...

  18. 48 CFR 1516.603-2 - What are the requirements for use of an NTP?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Time-and-Materials, Labor-Hour... may issue an NTP so long as it does not exceed the limits of his or her procurement authority and only... than the next working day after NTP issuance. (2) Within 5 working days of the EPA on-scene coordinator...

  19. [The contracting process and outsourcing in health: the scenario for dispute between public and private interests].

    PubMed

    Albuquerque, Maria do Socorro Veloso; Morais, Heloísa Maria Mendonça de; Lima, Luci Praciano

    2015-06-01

    This research analyzed the public-private composition in the municipal health network and aspects of the contracting/outsourcing process for services over the period from 2001 to 2008. The research method used was a case study with documentary research and interviews. The interviewees were former secretaries of health, directors of regulation and district managers. The categories of analysis used were public funds, care networks and public control. The results showed that the contracting was restricted to philanthropic units. With respect to the other private establishments linked to the public care network, non-compliance with programmatic aspects was detected, such as the lack of regulation of bidding processes required for contracting. Management authorities did not actively pursue building up state public services, or the formation of care networks. The contracted establishments conducted their activities without effective external and internal control mechanisms, which are paramount for the proper use of public resources. The authors conclude that the contracting process does not significantly alter the standard of buying and selling of services and indeed does not enhance the empowering process of the role of the public domain.

  20. Results from the MARBLE Campaign on the National Ignition Facility: Implosion of Foam-Filled Capsules for Studying Thermonuclear Burn in the Presence of Heterogeneous Mix

    NASA Astrophysics Data System (ADS)

    Murphy, T. J.; Douglas, M. R.; Cardenas, T.; Devolder, B. G.; Fincke, J. R.; Gunderson, M. A.; Haines, B. M.; Hamilton, C. E.; Kim, Y. H.; Lee, M. N.; Oertel, J. A.; Olson, R. E.; Randolph, R. B.; Shah, R. C.; Smidt, J. M.

    2016-10-01

    The MARBLE campaign on NIF investigates the effect of heterogeneous mix on thermonuclear burn for comparison to a probability distribution function (PDF) burn model. MARBLE utilizes plastic capsules filled with deuterated plastic foam and tritium gas. The ratio of DT to DD neutron yield is indicative of the degree to which the foam and the gas atomically mix. Platform development experiments have been performed to understand the behavior of the foam and of the gas separately using two types of capsule. The first uses partially deuterated foam and hydrogen gas fill to understand the burn in the foam. The second uses undeuterated foam and deuterium gas fill to understand the dynamics of the gas. Experiments using deuterated foam and tritium gas are planned. Results of these experiments, and the implications for our understanding of thermonuclear burn in heterogeneously mixed separated reactant experiments will be discussed. This work is supported by US DOE/NNSA, performed at LANL, operated by LANS LLC under contract DE-AC52-06NA25396.

  1. 48 CFR 970.5204-1 - Counterintelligence.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Counterintelligence. 970.5204-1 Section 970.5204-1 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Solicitation Provisions and Contract Clauses...

  2. 48 CFR 970.2803-1 - Workers' Compensation Insurance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Management, within the Headquarters procurement organization, other officials, and the Heads of Contracting... Office of Resource Management, within the Headquarters procurement organization, is responsible for... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Bonds and Insurance 970.2803-1 Workers...

  3. 48 CFR 970.2803-1 - Workers' Compensation Insurance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management, within the Headquarters procurement organization, other officials, and the Heads of Contracting... Office of Resource Management, within the Headquarters procurement organization, is responsible for... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Bonds and Insurance 970.2803-1 Workers...

  4. 48 CFR 970.2803-1 - Workers' Compensation Insurance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Management, within the Headquarters procurement organization, other officials, and the Heads of Contracting... Office of Resource Management, within the Headquarters procurement organization, is responsible for... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Bonds and Insurance 970.2803-1 Workers...

  5. 48 CFR 970.2803-1 - Workers' Compensation Insurance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Management, within the Headquarters procurement organization, other officials, and the Heads of Contracting... Office of Resource Management, within the Headquarters procurement organization, is responsible for... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Bonds and Insurance 970.2803-1 Workers...

  6. 48 CFR 970.2803-1 - Workers' Compensation Insurance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Management, within the Headquarters procurement organization, other officials, and the Heads of Contracting... Office of Resource Management, within the Headquarters procurement organization, is responsible for... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Bonds and Insurance 970.2803-1 Workers...

  7. 48 CFR 903.1004 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Contract clauses. (b)(2)(ii) Insert the DOE Web site address http://ig.energy.gov/hotline.htm in paragraph (b)(3) of the 48 CFR 52.203-14 clause, Display of Hotline Poster(s). [76 FR 7690, Feb. 11, 2011] ...

  8. 48 CFR 903.1004 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Contract clauses. (b)(2)(ii) Insert the DOE Web site address http://ig.energy.gov/hotline.htm in paragraph (b)(3) of the 48 CFR 52.203-14 clause, Display of Hotline Poster(s). [76 FR 7690, Feb. 11, 2011] ...

  9. 48 CFR 903.1004 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Contract clauses. (b)(2)(ii) Insert the DOE Web site address http://ig.energy.gov/hotline.htm in paragraph (b)(3) of the 48 CFR 52.203-14 clause, Display of Hotline Poster(s). [76 FR 7690, Feb. 11, 2011] ...

  10. 48 CFR 903.1004 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Contract clauses. (b)(2)(ii) Insert the DOE Web site address http://ig.energy.gov/hotline.htm in paragraph (b)(3) of the 48 CFR 52.203-14 clause, Display of Hotline Poster(s). [76 FR 7690, Feb. 11, 2011] ...

  11. 48 CFR 970.4401-2 - Review and approval.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing... contract; (2) The size, experience, ability, reliability, and organization of the management and operating contractor's purchasing function; (3) The internal controls, procedures, and organizational stature of the...

  12. Energy Research Abstracts. [DOE abstract journal

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-01-01

    Energy Research Abstracts (ERA) provides abstracting and indexing coverage of all scientific and technical reports, journal articles, conference papers and proceedings, books, patents, theses, and monographs originated by the US Department of Energy, its laboratories, energy centers, and contractors. ERA also covers other energy information prepared in report form by federal and state government organizations, foreign governments, and domestic and foreign universities and research organizations. ERA coverage of non-report literature is limited to that generated by Department of Energy activity. ERA is comprehensive in its subject scope, encompassing the DOE's research, development, demonstration, and technological programs resulting from its broadmore » charter for energy sources, conservation, safety, environmental impacts, and regulation. Corporate, author, subject, report number, and contract number indexes are included. ERA is available on an exchange basis to universities, research intitutions, industrial firms, and publishers of scientific information. Federal, state, and municipal agencies concerned with energy development, conservation, and usage may obtain ERA free of charge. Inquiries should be directed to the Technical Information Center, P.O. Box 62, Oak Ridge, Tennessee 37830. ERA is available to the public on a subscription basis for 24 semimonthly issues including a semiannual index and an annual index. All citations announced in ERA exist as separate records in the DOE Energy Data Base.« less

  13. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... ACCOMPLISHMENT OF SHIP REPAIRS UNDER NATIONAL SHIPPING AUTHORITY INDIVIDUAL CONTRACT FOR MINOR REPAIRS-NSA-WORKSMALREP Section 1 What this order does. This order authorizes the use of NSA-WORKSMALREP individual...

  14. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ACCOMPLISHMENT OF SHIP REPAIRS UNDER NATIONAL SHIPPING AUTHORITY INDIVIDUAL CONTRACT FOR MINOR REPAIRS-NSA-WORKSMALREP Section 1 What this order does. This order authorizes the use of NSA-WORKSMALREP individual...

  15. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACCOMPLISHMENT OF SHIP REPAIRS UNDER NATIONAL SHIPPING AUTHORITY INDIVIDUAL CONTRACT FOR MINOR REPAIRS-NSA-WORKSMALREP Section 1 What this order does. This order authorizes the use of NSA-WORKSMALREP individual...

  16. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... ACCOMPLISHMENT OF SHIP REPAIRS UNDER NATIONAL SHIPPING AUTHORITY INDIVIDUAL CONTRACT FOR MINOR REPAIRS-NSA-WORKSMALREP Section 1 What this order does. This order authorizes the use of NSA-WORKSMALREP individual...

  17. 46 CFR Section 1 - What this order does.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... ACCOMPLISHMENT OF SHIP REPAIRS UNDER NATIONAL SHIPPING AUTHORITY INDIVIDUAL CONTRACT FOR MINOR REPAIRS-NSA-WORKSMALREP Section 1 What this order does. This order authorizes the use of NSA-WORKSMALREP individual...

  18. 48 CFR 970.0371-3 - Definition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of... employed by the contractor, both full and part-time, who are assigned to work under a DOE management and...

  19. Does capitated contracting improve efficiency? Evidence from California hospitals.

    PubMed

    Chu, Hsuan-Lien; Liu, Shuen-Zen; Romeis, James C

    2004-01-01

    This study examines the effect of capitated contracting on hospital efficiency to better understand strategies related to the recent financial crisis in the California health care market. Our findings indicate that less efficient hospitals are more likely to participate in capitated contracting. As a result, hospitals with capitated contracts are, on average, less efficient than hospitals without capitated contracts. Hospital efficiency generally increases with respect to the degree of capitation involvement. The efficiency improvement, however, becomes insignificant when capitation exposures are already high. Thus, hospital executives should not be overly optimistic about efficiency gains obtained in capitated contracting and should control the degree of capitation involvement.

  20. CO2 Capture Project: An Integrated, Collaborative Technology Development Project For CO2 Separation, Capture And Geologic Sequestration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Helen Kerr

    2002-01-10

    This report (which forms part of the requirements of the Statement of Work Task 0, subtask 0.4) records progress towards defining a detailed Work Plan for the CCP 30 days after contract initiation. It describes the studies planned, workscope development and technology provider bid evaluation status at that time. Business sensitive information is provided separately in Appendix 1. Contract negotiations are on hold pending award of patent waiver status to the CCP.

  1. Stirling convertor performance mapping test results

    NASA Astrophysics Data System (ADS)

    Qiu, Songgang; Peterson, Allen A.; White, Maurice A.; Faultersack, Franklyn; Redinger, Darin L.; Petersen, Stephen L.

    2002-01-01

    The Department of Energy (DOE) has selected Free-Piston Stirling Convertors as a technology for future advanced radioisotope space power systems. In August 2000, DOE awarded competitive Phase I, Stirling Radioisotope Generator (SRG) power system integration contracts to three major aerospace contractors, resulting in SRG conceptual designs in February 2001. All three contractors based their designs on the Technology Demonstration Convertor (TDC) developed by Stirling Technology Company (STC) for DOE. The contract award to a single system integration contractor for Phases II and III of the SRG program is anticipated in late 2001. The first potential SRG mission is targeted for a Mars rover. Recent TDC performance data are provided in this paper, together with predictions from Stirling simulation models. .

  2. The Army’s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

    DTIC Science & Technology

    2017-01-11

    award a five-year Engineering and Manufacturing Development (EMD) contract in May 2014 worth $458 million to a single contractor for 29 prototypes...had selected BAE Systems Land and Armaments L.P. as the winner of the EMD contract . The initial award is for 52 months, valued at about $382 million...289 vehicles for a total contract value of $1.2 billion. This EMD contract does not include EAB AMPV variants. The AMPV reportedly successfully

  3. 48 CFR 951.101 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 951.101 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Government Supply Sources 951.101 Policy. (a) It is Department of Energy (DOE) policy that contractors performing under cost-reimbursement contracts should meet...

  4. 48 CFR 923.103 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 923.103 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE... specific DOE contracts); FAR 52.223-15, Energy Efficiency in Energy Consuming Products; and FAR 52.223-17...

  5. 48 CFR 923.103 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 923.103 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE... specific DOE contracts); FAR 52.223-15, Energy Efficiency in Energy Consuming Products; and FAR 52.223-17...

  6. 48 CFR 923.103 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 923.103 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE... specific DOE contracts); FAR 52.223-15, Energy Efficiency in Energy Consuming Products; and FAR 52.223-17...

  7. 48 CFR 923.103 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 923.103 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE... specific DOE contracts); FAR 52.223-15, Energy Efficiency in Energy Consuming Products; and FAR 52.223-17...

  8. 48 CFR 970.2305-2 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 970.2305-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Environment, Energy and Water Efficiency, Renewable Energy... operating contracts awarded under the authority of the Atomic Energy Act of 1954, as amended, are required...

  9. 48 CFR 970.3770-2 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false [Reserved] 970.3770-2 Section 970.3770-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770-2 [Reserved] ...

  10. 48 CFR 927.300 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 927.300 Federal Acquisition Regulations System DEPARTMENT OF ENERGY GENERAL CONTRACTING REQUIREMENTS PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 927.300 General. (a) One of the... sources of energy. To accomplish its mission, DOE must work in cooperation with industry in the...

  11. 48 CFR 742.1170-3 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to adequately monitor contractor performance (for example, the day-to-day working proximity of the... contractor is responsible for timely contract performance. Performance monitoring by USAID does not obviate... contracting officer, will determine how to monitor the contractor's performance to protect the Government's...

  12. 48 CFR 204.7000 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., contracts, and related instruments; and (b) Does not apply to solicitations or orders for communication service authorizations issued by the Defense Information Technology Contracting Organization of the Defense Information Systems Agency in accordance with 239.7407-2. [68 FR 64556, Nov. 14, 2003] ...

  13. 10 CFR 600.141 - Recipient responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... referred to such Federal, State or local authority as may have proper jurisdiction. ... contract(s). The recipient is the responsible authority, without recourse to DOE regarding the settlement and satisfaction of all contractual and administrative issues arising out of procurements entered into...

  14. 48 CFR 9.101 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 9.101 Section 9.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING... contract or grant. It does not include agency actions such as contract audits, site visits, corrective...

  15. 41 CFR 102-85.155 - What does a customer agency do if it does not agree with a Rent bill?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of a customer agency may further appeal to the Administrator of the General Services. Documentation... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What does a customer... customer agency do if it does not agree with a Rent bill? (a) If a customer agency does not agree with the...

  16. 48 CFR 970.0371 - Conduct of employees of DOE management and operating contractors.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Conduct of employees of DOE management and operating contractors. 970.0371 Section 970.0371 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS...

  17. 48 CFR 927.302 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... DOE before domestic and foreign patent offices; (4) Accept assignments and instruments confirmatory of... PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 927.302 Policy. (a) Except for... application for a patent and retain title to any ensuing patent in any foreign country in which DOE does not...

  18. 48 CFR 927.302 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... DOE before domestic and foreign patent offices; (4) Accept assignments and instruments confirmatory of... PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 927.302 Policy. (a) Except for... application for a patent and retain title to any ensuing patent in any foreign country in which DOE does not...

  19. 48 CFR 927.302 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... DOE before domestic and foreign patent offices; (4) Accept assignments and instruments confirmatory of... PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 927.302 Policy. (a) Except for... application for a patent and retain title to any ensuing patent in any foreign country in which DOE does not...

  20. 48 CFR 927.302 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... DOE before domestic and foreign patent offices; (4) Accept assignments and instruments confirmatory of... PATENTS, DATA, AND COPYRIGHTS Patent Rights Under Government Contracts 927.302 Policy. (a) Except for... application for a patent and retain title to any ensuing patent in any foreign country in which DOE does not...

Top