NASA Technical Reports Server (NTRS)
Martin, W. L.; Zygielbaum, A. I.
1977-01-01
The Mu-II Dual-Channel Sequential Ranging System designed as a model for future Deep Space Network ranging equipment is described. A list of design objectives is followed by a theoretical explanation of the digital demodulation techniques first employed in this machine. Hardware and software implementation are discussed, together with the details relating to the construction of the device. Two appendixes are included relating to the programming and operation of this equipment to yield the maximum scientific data.
Operation of a single-channel, sequential Navstar GPS receiver in a helicopter mission environment
NASA Technical Reports Server (NTRS)
Edwards, F. G.; Hamlin, J. R.
1984-01-01
It is pointed out that the future utilization of the Navstar Global Positioning System (GPS) by civil helicopters will provide an enhanced performance not obtainable with current navigations systems. GPS will supply properly equipped users with extremely accurate three-dimensional position and velocity information anywhere in the world. Preliminary studies have been conducted to investigate differential GPS concept mechanizations and cost, and to theoretically predict navigation performance and the impact of degradation of the GPS C/A code for national security considerations. The obtained results are encouraging, but certain improvements are needed. As a second step in the program, a single-channel sequential GPS navigator was installed and operated in the NASA SH-3G helicopter. A series of flight tests were conducted. It is found that performance of the Navstar GPS Z-set is quite acceptable to support area navigation and nonprecision approach operations.
Reverse osmosis water purification system
NASA Technical Reports Server (NTRS)
Ahlstrom, H. G.; Hames, P. S.; Menninger, F. J.
1986-01-01
A reverse osmosis water purification system, which uses a programmable controller (PC) as the control system, was designed and built to maintain the cleanliness and level of water for various systems of a 64-m antenna. The installation operates with other equipment of the antenna at the Goldstone Deep Space Communication Complex. The reverse osmosis system was designed to be fully automatic; with the PC, many complex sequential and timed logic networks were easily implemented and are modified. The PC monitors water levels, pressures, flows, control panel requests, and set points on analog meters; with this information various processes are initiated, monitored, modified, halted, or eliminated as required by the equipment being supplied pure water.
Automation of servicibility of radio-relay station equipment
NASA Astrophysics Data System (ADS)
Uryev, A. G.; Mishkin, Y. I.; Itkis, G. Y.
1985-03-01
Automation of the serviceability of radio relay station equipment must ensure central gathering and primary processing of reliable instrument reading with subsequent display on the control panel, detection and recording of failures soon enough, advance enough warning based on analysis of detertioration symptoms, and correct remote measurement of equipment performance parameters. Such an inspection will minimize transmission losses while reducing nonproductive time and labor spent on documentation and measurement. A multichannel automated inspection system for this purpose should operate by a parallel rather than sequential procedure. Digital data processing is more expedient in this case than analog method and, therefore, analog to digital converters are required. Spepcial normal, above limit and below limit test signals provide means of self-inspection, to which must be added adequate interference immunization, stabilization, and standby power supply. Use of a microcomputer permits overall refinement and expansion of the inspection system while it minimizes though not completely eliminates dependence on subjective judgment.
Fluorescence-spectrometer helps Mobil increase analytical output by 50%
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamm, J.C.; Peckham, M.R.; Powers, J.
1987-09-01
A wide range of gear-oil packages and synthetic oil bases for motor vehicle use are produced at Mobil Chemical Company's Beaumont, TX, Chemical Specialties Plant (BCSP). Also manufactured are industrial lubricants, hydraulic fluids, and a selection of specialty oils. For a number of years, Mobil used what at that time represented up-to-date X-ray fluorescence technology for analyzing its oil products. Mobil decided to search for a more efficient X-ray fluorescence spectrometer for oil analyses that would provide a number of major features such a high speed, accuracy and reproducibility, appropriate software for matrix correction, a helium atmosphere for determining lightmore » elements in liquids, and the ability to determine both high and low (ppm level) concentrations quantitatively. In the spring of 1985, Mobil installed new X-ray fluorescence equipment that gives much faster analysis of liquid samples, greater analytical sensitivity, and a much more stable system. In addition, the unit produces calibration curves, retains reference-standards data in memory, and gives numerical or graphical readouts which directly show deviations from the specified levels of Cl, S, and P components for each sample, analyzed sequentially or simultaneously. The spectrometer combines the speed and high throughput of multichannel spectrometers along with the high flexibility of sequential goniometers. The hybrid configuration incorporates a versatile goniometer with as many as 10 monochromators and operates under computer control. All benefits of the modern equipment have given Mobil better product quality, faster production approvals, and greater overall operational economics.« less
Space station functional relationships analysis
NASA Technical Reports Server (NTRS)
Tullis, Thomas S.; Bied, Barbra R.
1988-01-01
A systems engineering process is developed to assist Space Station designers to understand the underlying operational system of the facility so that it can be physically arranged and configured to support crew productivity. The study analyzes the operational system proposed for the Space Station in terms of mission functions, crew activities, and functional relationships in order to develop a quantitative model for evaluation of interior layouts, configuration, and traffic analysis for any Station configuration. Development of the model involved identification of crew functions, required support equipment, criteria of assessing functional relationships, and tools for analyzing functional relationship matrices, as well as analyses of crew transition frequency, sequential dependencies, support equipment requirements, potential for noise interference, need for privacy, and overall compatability of functions. The model can be used for analyzing crew functions for the Initial Operating Capability of the Station and for detecting relationships among these functions. Note: This process (FRA) was used during Phase B design studies to test optional layouts of the Space Station habitat module. The process is now being automated as a computer model for use in layout testing of the Space Station laboratory modules during Phase C.
21 CFR 225.65 - Equipment cleanout procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
...) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Product Quality Control § 225.65 Equipment cleanout procedures. (a) Adequate cleanout procedures for all equipment used in the manufacture... sequential production of feeds. (2) If flushing is utilized, the flush material shall be properly identified...
40 CFR 60.4142 - Hg allowance allocations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... boiler and has equipment used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the... thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of...
Field-Sequential Color Converter
NASA Technical Reports Server (NTRS)
Studer, Victor J.
1989-01-01
Electronic conversion circuit enables display of signals from field-sequential color-television camera on color video camera. Designed for incorporation into color-television monitor on Space Shuttle, circuit weighs less, takes up less space, and consumes less power than previous conversion equipment. Incorporates state-of-art memory devices, also used in terrestrial stationary or portable closed-circuit television systems.
Nikitin, Iu D; Ovchinnikov, A V
1998-01-01
A way of reducing the cost price of hospital automation is proposed. It is not necessary for it to update the whole equipment, but only a small part--the workstations used by programmers for their work, which support the stability of hospital automation; the working places of operators should be kept without modifications, but to allot them properties to inherit a potency and modernity of the purchased equipment; for this purpose they should be equipped with virtual machines copying properties of workstations being arrange in accordance with the pyramidal structure. A UNIX which represents a multi-user, multitask operational operative system providing an access on several pseudoterminals is simultaneously installed on the PENTIUM 100/133 workstation. A graphic terminal of the AMR "UnTerminal" firm (USA) is proposed for use as working places. Their advantage is that they have a special adapter connected directly to the bus of PC extension. Each user is allotted a video adapter, a keyboard controller, sequential and parallel interfaces for connection of the printer and manipulator. Each working place supports multitasking and it can be equipped with a printer, a "mouse" or modem. The image is transmitted on work places with a very high velocity-77 mehabits/sec that supports not only a text mode, but also VGA or SVGA graphics. Certainly, graphic terminals are more expensive than text terminals, but their capacities are similar to those of the main computer, here, the workstation. They may be located from the main computer at a distance of up to 75 meters or more and do not require adjustment during their installation.
40 CFR 97.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... equipment used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam... unit that is a combustion turbine and has equipment used to produce electricity and useful thermal...
40 CFR 97.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... equipment used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam... unit that is a combustion turbine and has equipment used to produce electricity and useful thermal...
40 CFR 97.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... equipment used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam... unit that is a combustion turbine and has equipment used to produce electricity and useful thermal...
40 CFR 97.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam... unit that is a combustion turbine and has equipment used to produce electricity and useful thermal...
NASA Astrophysics Data System (ADS)
Starks, Michael R.
1990-09-01
A variety of low cost devices for capturing, editing and displaying field sequential 60 cycle stereoscopic video have recently been marketed by 3D TV Corp. and others. When properly used, they give very high quality images with most consumer and professional equipment. Our stereoscopic multiplexers for creating and editing field sequential video in NTSC or component(SVHS, Betacain, RGB) and Home 3D Theater system employing LCD eyeglasses have made 3D movies and television available to a large audience.
Continuity of the sequential product of sequential quantum effect algebras
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lei, Qiang, E-mail: leiqiang@hit.edu.cn; Su, Xiaochao, E-mail: hitswh@163.com; Wu, Junde, E-mail: wjd@zju.edu.cn
In order to study quantum measurement theory, sequential product defined by A∘B = A{sup 1/2}BA{sup 1/2} for any two quantum effects A, B has been introduced. Physically motivated conditions ask the sequential product to be continuous with respect to the strong operator topology. In this paper, we study the continuity problems of the sequential product A∘B = A{sup 1/2}BA{sup 1/2} with respect to other important topologies, such as norm topology, weak operator topology, order topology, and interval topology.
Brief Lags in Interrupted Sequential Performance: Evaluating a Model and Model Evaluation Method
2015-01-05
rehearsal mechanism in the model. To evaluate the model we developed a simple new goodness-of-fit test based on analysis of variance that offers an...repeated step). Sequen- tial constraints are common in medicine, equipment maintenance, computer programming and technical support, data analysis ...legal analysis , accounting, and many other home and workplace environ- ments. Sequential constraints also play a role in such basic cognitive processes
Cost-effectiveness of simultaneous versus sequential surgery in head and neck reconstruction.
Wong, Kevin K; Enepekides, Danny J; Higgins, Kevin M
2011-02-01
To determine whether simultaneous (ablation and reconstruction overlaps by two teams) head and neck reconstruction is cost effective compared to sequentially (ablation followed by reconstruction) performed surgery. Case-controlled study. Tertiary care hospital. Oncology patients undergoing free flap reconstruction of the head and neck. A match paired comparison study was performed with a retrospective chart review examining the total time of surgery for sequential and simultaneous surgery. Nine patients were selected for both the sequential and simultaneous groups. Sequential head and neck reconstruction patients were pair matched with patients who had undergone similar oncologic ablative or reconstructive procedures performed in a simultaneous fashion. A detailed cost analysis using the microcosting method was then undertaken looking at the direct costs of the surgeons, anesthesiologist, operating room, and nursing. On average, simultaneous surgery required 3 hours 15 minutes less operating time, leading to a cost savings of approximately $1200/case when compared to sequential surgery. This represents approximately a 15% reduction in the cost of the entire operation. Simultaneous head and neck reconstruction is more cost effective when compared to sequential surgery.
G-sequentially connectedness for topological groups with operations
NASA Astrophysics Data System (ADS)
Mucuk, Osman; Cakalli, Huseyin
2016-08-01
It is a well-known fact that for a Hausdorff topological group X, the limits of convergent sequences in X define a function denoted by lim from the set of all convergent sequences in X to X. This notion has been modified by Connor and Grosse-Erdmann for real functions by replacing lim with an arbitrary linear functional G defined on a linear subspace of the vector space of all real sequences. Recently some authors have extended the concept to the topological group setting and introduced the concepts of G-sequential continuity, G-sequential compactness and G-sequential connectedness. In this work, we present some results about G-sequentially closures, G-sequentially connectedness and fundamental system of G-sequentially open neighbourhoods for topological group with operations which include topological groups, topological rings without identity, R-modules, Lie algebras, Jordan algebras, and many others.
A sequential adaptation technique and its application to the Mark 12 IFF system
NASA Astrophysics Data System (ADS)
Bailey, John S.; Mallett, John D.; Sheppard, Duane J.; Warner, F. Neal; Adams, Robert
1986-07-01
Sequential adaptation uses only two sets of receivers, correlators, and A/D converters which are time multiplexed to effect spatial adaptation in a system with (N) adaptive degrees of freedom. This technique can substantially reduce the hardware cost over what is realizable in a parallel architecture. A three channel L-band version of the sequential adapter was built and tested for use with the MARK XII IFF (identify friend or foe) system. In this system the sequentially determined adaptive weights were obtained digitally but implemented at RF. As a result, many of the post RF hardware induced sources of error that normally limit cancellation, such as receiver mismatch, are removed by the feedback property. The result is a system that can yield high levels of cancellation and be readily retrofitted to currently fielded equipment.
PARVMEC: An Efficient, Scalable Implementation of the Variational Moments Equilibrium Code
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seal, Sudip K; Hirshman, Steven Paul; Wingen, Andreas
The ability to sustain magnetically confined plasma in a state of stable equilibrium is crucial for optimal and cost-effective operations of fusion devices like tokamaks and stellarators. The Variational Moments Equilibrium Code (VMEC) is the de-facto serial application used by fusion scientists to compute magnetohydrodynamics (MHD) equilibria and study the physics of three dimensional plasmas in confined configurations. Modern fusion energy experiments have larger system scales with more interactive experimental workflows, both demanding faster analysis turnaround times on computational workloads that are stressing the capabilities of sequential VMEC. In this paper, we present PARVMEC, an efficient, parallel version of itsmore » sequential counterpart, capable of scaling to thousands of processors on distributed memory machines. PARVMEC is a non-linear code, with multiple numerical physics modules, each with its own computational complexity. A detailed speedup analysis supported by scaling results on 1,024 cores of a Cray XC30 supercomputer is presented. Depending on the mode of PARVMEC execution, speedup improvements of one to two orders of magnitude are reported. PARVMEC equips fusion scientists for the first time with a state-of-theart capability for rapid, high fidelity analyses of magnetically confined plasmas at unprecedented scales.« less
NASA Astrophysics Data System (ADS)
Herbuś, K.; Ociepka, P.
2017-08-01
In the work is analysed a sequential control system of a machine for separating and grouping work pieces for processing. Whereas, the area of the considered problem is related with verification of operation of an actuator system of an electro-pneumatic control system equipped with a PLC controller. Wherein to verification is subjected the way of operation of actuators in view of logic relationships assumed in the control system. The actuators of the considered control system were three drives of linear motion (pneumatic cylinders). And the logical structure of the system of operation of the control system is based on the signals flow graph. The tested logical structure of operation of the electro-pneumatic control system was implemented in the Automation Studio software of B&R company. This software is used to create programs for the PLC controllers. Next, in the FluidSIM software was created the model of the actuator system of the control system of a machine. To verify the created program for the PLC controller, simulating the operation of the created model, it was utilized the approach of integration these two programs using the tool for data exchange in the form of the OPC server.
Rendezvous and docking tracker
NASA Technical Reports Server (NTRS)
Ray, Art J.; Ross, Susan E.; Deming, Douglas R.
1986-01-01
A conceptual solid-state rendezvous and docking tracker (RDT) has been devised for generating range and attitude data for a docking vehicle relative to a target vehicle. Emphasis is placed on the approach of the Orbiter to a link with the Space Station. Three laser illuminators ring the optical axis of the lens a directed toward retroreflectors on the target vehicle. Each retroreflector is equipped with a bandpass filter for a designated illumination frequency. Data are collected sequentially over a 20 deg field of view as the range closes to 100-1000 m. A fourth ranging retroreflector 0.3 m from center is employed during close-in maneuvers. The system provides tracking data on motions with 6 deg of freedom, and furnishes 500 msec updates (to be enhanced to 100 msec) to the operator at a computer console.
Data Processing Aspects of MEDLARS
Austin, Charles J.
1964-01-01
The speed and volume requirements of MEDLARS necessitate the use of high-speed data processing equipment, including paper-tape typewriters, a digital computer, and a special device for producing photo-composed output. Input to the system is of three types: variable source data, including citations from the literature and search requests; changes to such master files as the medical subject headings list and the journal record file; and operating instructions such as computer programs and procedures for machine operators. MEDLARS builds two major stores of data on magnetic tape. The Processed Citation File includes bibliographic citations in expanded form for high-quality printing at periodic intervals. The Compressed Citation File is a coded, time-sequential citation store which is used for high-speed searching against demand request input. Major design considerations include converting variable-length, alphanumeric data to mechanical form quickly and accurately; serial searching by the computer within a reasonable period of time; high-speed printing that must be of graphic quality; and efficient maintenance of various complex computer files. PMID:14119287
DATA PROCESSING ASPECTS OF MEDLARS.
AUSTIN, C J
1964-01-01
The speed and volume requirements of MEDLARS necessitate the use of high-speed data processing equipment, including paper-tape typewriters, a digital computer, and a special device for producing photo-composed output. Input to the system is of three types: variable source data, including citations from the literature and search requests; changes to such master files as the medical subject headings list and the journal record file; and operating instructions such as computer programs and procedures for machine operators. MEDLARS builds two major stores of data on magnetic tape. The Processed Citation File includes bibliographic citations in expanded form for high-quality printing at periodic intervals. The Compressed Citation File is a coded, time-sequential citation store which is used for high-speed searching against demand request input. Major design considerations include converting variable-length, alphanumeric data to mechanical form quickly and accurately; serial searching by the computer within a reasonable period of time; high-speed printing that must be of graphic quality; and efficient maintenance of various complex computer files.
NASA Technical Reports Server (NTRS)
Junge, M. K.; Giacomi, M. J.
1981-01-01
The results of a human factors test to assay the suitability of a prototype general purpose work station (GPWS) for biosciences experiments on the fourth Spacelab mission are reported. The evaluation was performed to verify that users of the GPWS would optimally interact with the GPWS configuration and instrumentation. Six male subjects sat on stools positioned to allow assimilation of the zero-g body posture. Trials were run concerning the operator viewing angles facing the console, the console color, procedures for injecting rates with dye, a rat blood cell count, mouse dissection, squirrel monkey transfer, and plant fixation. The trials were run for several days in order to gage improvement or poor performance conditions. Better access to the work surface was found necessary, together with more distinct and better located LEDs, better access window latches, clearer sequences on control buttons, color-coded sequential buttons, and provisions made for an intercom system when operators of the GPWS work in tandem.
Measuring Incompatible Observables by Exploiting Sequential Weak Values.
Piacentini, F; Avella, A; Levi, M P; Gramegna, M; Brida, G; Degiovanni, I P; Cohen, E; Lussana, R; Villa, F; Tosi, A; Zappa, F; Genovese, M
2016-10-21
One of the most intriguing aspects of quantum mechanics is the impossibility of measuring at the same time observables corresponding to noncommuting operators, because of quantum uncertainty. This impossibility can be partially relaxed when considering joint or sequential weak value evaluation. Indeed, weak value measurements have been a real breakthrough in the quantum measurement framework that is of the utmost interest from both a fundamental and an applicative point of view. In this Letter, we show how we realized for the first time a sequential weak value evaluation of two incompatible observables using a genuine single-photon experiment. These (sometimes anomalous) sequential weak values revealed the single-operator weak values, as well as the local correlation between them.
Measuring Incompatible Observables by Exploiting Sequential Weak Values
NASA Astrophysics Data System (ADS)
Piacentini, F.; Avella, A.; Levi, M. P.; Gramegna, M.; Brida, G.; Degiovanni, I. P.; Cohen, E.; Lussana, R.; Villa, F.; Tosi, A.; Zappa, F.; Genovese, M.
2016-10-01
One of the most intriguing aspects of quantum mechanics is the impossibility of measuring at the same time observables corresponding to noncommuting operators, because of quantum uncertainty. This impossibility can be partially relaxed when considering joint or sequential weak value evaluation. Indeed, weak value measurements have been a real breakthrough in the quantum measurement framework that is of the utmost interest from both a fundamental and an applicative point of view. In this Letter, we show how we realized for the first time a sequential weak value evaluation of two incompatible observables using a genuine single-photon experiment. These (sometimes anomalous) sequential weak values revealed the single-operator weak values, as well as the local correlation between them.
500 MHz narrowband beam position monitor electronics for electron synchrotrons
NASA Astrophysics Data System (ADS)
Mohos, I.; Dietrich, J.
1998-12-01
Narrowband beam position monitor electronics were developed in the Forschungszentrum Jülich-IKP for the orbit measurement equipment used at ELSA Bonn. The equipment uses 32 monitor chambers, each with four capacitive button electrodes. The monitor electronics, consisting of an rf signal processing module (BPM-RF) and a data acquisition and control module (BPM-DAQ), sequentially process and measure the monitor signals and deliver calculated horizontal and vertical beam position data via a serial network.
Sequential circuit design for radiation hardened multiple voltage integrated circuits
Clark, Lawrence T [Phoenix, AZ; McIver, III, John K.
2009-11-24
The present invention includes a radiation hardened sequential circuit, such as a bistable circuit, flip-flop or other suitable design that presents substantial immunity to ionizing radiation while simultaneously maintaining a low operating voltage. In one embodiment, the circuit includes a plurality of logic elements that operate on relatively low voltage, and a master and slave latches each having storage elements that operate on a relatively high voltage.
Application and Design Characteristics of Generalized Training Devices.
ERIC Educational Resources Information Center
Parker, Edward L.
This program identified applications and developed design characteristics for generalized training devices. The first of three sequential phases reviewed in detail new developments in Naval equipment technology that influence the design of maintenance training devices: solid-state circuitry, modularization, digital technology, standardization,…
Shteingart, Hanan; Loewenstein, Yonatan
2016-01-01
There is a long history of experiments in which participants are instructed to generate a long sequence of binary random numbers. The scope of this line of research has shifted over the years from identifying the basic psychological principles and/or the heuristics that lead to deviations from randomness, to one of predicting future choices. In this paper, we used generalized linear regression and the framework of Reinforcement Learning in order to address both points. In particular, we used logistic regression analysis in order to characterize the temporal sequence of participants' choices. Surprisingly, a population analysis indicated that the contribution of the most recent trial has only a weak effect on behavior, compared to more preceding trials, a result that seems irreconcilable with standard sequential effects that decay monotonously with the delay. However, when considering each participant separately, we found that the magnitudes of the sequential effect are a monotonous decreasing function of the delay, yet these individual sequential effects are largely averaged out in a population analysis because of heterogeneity. The substantial behavioral heterogeneity in this task is further demonstrated quantitatively by considering the predictive power of the model. We show that a heterogeneous model of sequential dependencies captures the structure available in random sequence generation. Finally, we show that the results of the logistic regression analysis can be interpreted in the framework of reinforcement learning, allowing us to compare the sequential effects in the random sequence generation task to those in an operant learning task. We show that in contrast to the random sequence generation task, sequential effects in operant learning are far more homogenous across the population. These results suggest that in the random sequence generation task, different participants adopt different cognitive strategies to suppress sequential dependencies when generating the "random" sequences.
ERIC Educational Resources Information Center
Lee, Seong-Soo
1982-01-01
Tenth-grade students (n=144) received training on one of three processing methods: coding-mapping (simultaneous), coding only, or decision tree (sequential). The induced simultaneous processing strategy worked optimally under rule learning, while the sequential strategy was difficult to induce and/or not optimal for rule-learning operations.…
A Guide to Curriculum Planning in Foreign Language.
ERIC Educational Resources Information Center
Wisconsin State Dept. of Public Instruction, Madison.
A guide designed to help local curriculum planners develop and implement curriculums to provide all students with equal access to foreign languages provides an overview of current philosophies, objectives, methods, materials, and equipment and a guide to sequential program development, articulation, and evaluation. An introductory section…
One-sided truncated sequential t-test: application to natural resource sampling
Gary W. Fowler; William G. O' Regan
1974-01-01
A new procedure for constructing one-sided truncated sequential t-tests and its application to natural resource sampling are described. Monte Carlo procedures were used to develop a series of one-sided truncated sequential t-tests and the associated approximations to the operating characteristic and average sample number functions. Different truncation points and...
30 CFR 250.1623 - Well-control fluids, equipment, and operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Well-control fluids, equipment, and operations... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1623 Well-control fluids, equipment, and operations. (a) Well-control fluids, equipment, and operations...
Sequential growth for lifetime extension in biomimetic polypyrrole actuator systems
NASA Astrophysics Data System (ADS)
Sarrazin, J. C.; Mascaro, Stephen A.
2015-04-01
Electroactive polymers (EAPs) present prospective use in actuation and manipulation devices due to their low electrical activation requirements, biocompatibility, and mechanical performance. One of the main drawbacks with EAP actuators is a decrease in performance over extended periods of operation caused by over-oxidation of the polymer and general polymer degradation. Synthesis of the EAP material, polypyrrole with an embedded metal helix allows for sequential growth of the polymer during operation. The helical metal electrode acts as a scaffolding to support the polymer, and direct the 3-dimensional change in volume of the polymer along the axis of the helix during oxidative and reductive cycling. The metal helix also provides a working metal electrode through the entire length of the polymer actuator to distribute charge for actuation, as well as for sequential growth steps during the lifetime of operation of the polymer. This work demonstrates the method of sequential growth can be utilized after extended periods of use to partially restore electrical and mechanical performance of polypyrrole actuators. Since the actuation must be temporarily stopped to allow for a sequential growth cycle to be performed and reverse some of the polymer degradation, these actuator systems more closely mimic natural muscle in their analogous maintenance and repair.
40 CFR 96.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam produced by the... combustion turbine and has equipment used to produce electricity and useful thermal energy for industrial...
40 CFR 96.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam produced by the... combustion turbine and has equipment used to produce electricity and useful thermal energy for industrial...
40 CFR 96.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam produced by the... combustion turbine and has equipment used to produce electricity and useful thermal energy for industrial...
40 CFR 96.142 - CAIR NOX allowance allocations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... used to produce electricity and useful thermal energy for industrial, commercial, heating, or cooling purposes through the sequential use of energy, the total heat energy (in Btu) of the steam produced by the... combustion turbine and has equipment used to produce electricity and useful thermal energy for industrial...
Mjollnir Rotational Line Scan Diagnostics.
1981-05-19
using long cavity. M8 Removable Pellicle Beam Splitter for He-Ne Lineup Beam. Removed before HF or DF laser is turned on. 27 A 27 * A r of the chopper...three probe laser lines, however three lines were sequentially measured to verify the diagnostic equipment. Two of the three lines have been monitored
30 CFR 75.1916 - Operation of diesel-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operation of diesel-powered equipment. 75.1916... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1916 Operation of diesel-powered equipment. (a) Diesel-powered equipment shall be operated at a speed that is...
30 CFR 75.1916 - Operation of diesel-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operation of diesel-powered equipment. 75.1916... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1916 Operation of diesel-powered equipment. (a) Diesel-powered equipment shall be operated at a speed that is...
Sequential, progressive, equal-power, reflective beam-splitter arrays
NASA Astrophysics Data System (ADS)
Manhart, Paul K.
2017-11-01
The equations to calculate equal-power reflectivity of a sequential series of beam splitters is presented. Non-sequential optical design examples are offered for uniform illumination using diode lasers. Objects created using Boolean operators and Swept Surfaces can create objects capable of reflecting light into predefined elevation and azimuth angles. Analysis of the illumination patterns for the array are also presented.
Saadeh, Charles K; Rosero, Eric B; Joshi, Girish P; Ozayar, Esra; Mau, Ted
2017-12-01
To determine the extent to which a sequential anesthetic technique 1) shortens time under sedation for thyroplasty with arytenoid adduction (TP-AA), 2) affects the total operative time, and 3) changes the voice outcome compared to TP-AA performed entirely under sedation/analgesia. Case-control study. A new sequential anesthetic technique of performing most of the TP-AA surgery under general anesthesia (GA), followed by transition to sedation/analgesia (SA) for voice assessment, was developed to achieve smooth emergence from GA. Twenty-five TP-AA cases performed with the sequential GA-SA technique were compared with 25 TP-AA controls performed completely under sedation/analgesia. The primary outcome measure was the time under sedation. Voice improvement, as assessed by Consensus Auditory-Perceptual Evaluation of Voice, and total operative time were secondary outcome measures. With the conventional all-SA anesthetic, the duration of SA was 209 ± 26.3 minutes. With the sequential GA-SA technique, the duration of SA was 79.0 ± 18.9 minutes, a 62.3% reduction (P < 0.0001). There was no significant difference in the total operative time (209.5 vs. 200.9 minutes; P = 0.42) or in voice outcome. This sequential anesthetic technique has been easily adopted by multiple anesthesiologists and nurse anesthetists at our institution. TP-AA is effectively performed under sequential GA-SA technique with a significant reduction in the duration of time under sedation. This allows the surgeon to perform the technically more challenging part of the surgery under GA, without having to contend with variability in patient tolerance for laryngeal manipulation under sedation. 3b. Laryngoscope, 127:2813-2817, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.
Outcomes of simultaneous resections for patients with synchronous colorectal liver metastases.
Slesser, A A P; Chand, M; Goldin, R; Brown, G; Tekkis, P P; Mudan, S
2013-12-01
The aim of this study was to determine the outcomes associated with simultaneous resections compared to patients undergoing sequential resections for synchronous colorectal liver metastases. Consecutive patients undergoing hepatic resections between 2000 and 2012 for synchronous colorectal liver metastases were identified from a prospectively maintained database. Of the 112 hepatic resections that were performed, 36 were simultaneous resections and 76 were sequential resections. There was no difference in disease severity: number of metastases (P 0.228), metastatic size (P 0.58), the primary tumour nodal status (P 0.283), CEA (P 0.387) or the presence of extra-hepatic metastases (P 1.0). Major hepatic resections were performed in 23 (64%) and 60 (79%) of patients in the simultaneous and sequential groups respectively (P 0.089). Intra-operatively no differences were found in blood loss (P 1.0), duration of surgery (P 0.284) or number of adverse events (P 1.0). There were no differences in post-operative complications (P 0.161) or post-operative mortality (P 0.241). The length of hospital stay was 14 (95% CI 12.0-18.0) and 18.5 (95% CI 16.0-23.0) days in the simultaneous and sequential groups respectively (P 0.03). The 3-year overall survival was 75% and 64% in the simultaneous and sequential groups respectively (P 0.379). The 3-year hepatic recurrence free survival was 61% and 46% in the simultaneous and sequential groups respectively (P 0.254). Simultaneous resections result in similar short-term and long-term outcomes as patients receiving sequential resections with comparable metastatic disease and are associated with a significant reduction in the length of stay. Copyright © 2013 Elsevier Ltd. All rights reserved.
The Intelligent Management System: An Overview.
1982-12-07
comprises of hundreds of subprocesses concerned with bulb grasping, positioning, heating, cooling, etc. Each is sequentially related with others in time...activity. Activity schemata can be constructed into a network to define both parallel and sequential precedence, and hierarchical to describe...The flow of work is controlled by the "operation- lineup " associated with the product being manufactured. The operation- lineup specifies the sequence of
Multi-Level Sequential Pattern Mining Based on Prime Encoding
NASA Astrophysics Data System (ADS)
Lianglei, Sun; Yun, Li; Jiang, Yin
Encoding is not only to express the hierarchical relationship, but also to facilitate the identification of the relationship between different levels, which will directly affect the efficiency of the algorithm in the area of mining the multi-level sequential pattern. In this paper, we prove that one step of division operation can decide the parent-child relationship between different levels by using prime encoding and present PMSM algorithm and CROSS-PMSM algorithm which are based on prime encoding for mining multi-level sequential pattern and cross-level sequential pattern respectively. Experimental results show that the algorithm can effectively extract multi-level and cross-level sequential pattern from the sequence database.
Microscale Symmetrical Electroporator Array as a Versatile Molecular Delivery System
NASA Astrophysics Data System (ADS)
Ouyang, Mengxing; Hill, Winfield; Lee, Jung Hyun; Hur, Soojung Claire
2017-03-01
Successful developments of new therapeutic strategies often rely on the ability to deliver exogenous molecules into cytosol. We have developed a versatile on-chip vortex-assisted electroporation system, engineered to conduct sequential intracellular delivery of multiple molecules into various cell types at low voltage in a dosage-controlled manner. Micro-patterned planar electrodes permit substantial reduction in operational voltages and seamless integration with an existing microfluidic technology. Equipped with real-time process visualization functionality, the system enables on-chip optimization of electroporation parameters for cells with varying properties. Moreover, the system’s dosage control and multi-molecular delivery capabilities facilitate intracellular delivery of various molecules as a single agent or in combination and its utility in biological research has been demonstrated by conducting RNA interference assays. We envision the system to be a powerful tool, aiding a wide range of applications, requiring single-cell level co-administrations of multiple molecules with controlled dosages.
[Co-composting high moisture vegetable waste and flower waste in a sequential fed operation].
Zhang, Xiangfeng; Wang, Hongtao; Nie, Yongfeng
2003-11-01
Co-composting of high moisture vegetable wastes (celery and cabbage) and flower wastes (carnation) were studied in a sequential fed bed. The preliminary materials of composting were celery and carnation wastes. The sequential fed materials of composting were cabbage wastes and were fed every 4 days. Moisture content of mixture materials was between 60% and 70%. Composting was done in an aerobic static bed of composting based temperature feedback and control via aeration rate regulation. Aeration was ended when temperature of the pile was about 40 degrees C. Changes of composting of temperature, aeration rate, water content, organic matter, ash, pH, volume, NH4(+)-N, and NO3(-)-N were studied. Results show that co-composting of high moisture vegetable wastes and flower wastes, in a sequential fed aerobic static bed based temperature feedback and control via aeration rate regulation, can stabilize organic matter and removal water rapidly. The sequential fed operation are effective to overcome the difficult which traditional composting cannot applied successfully where high moisture vegetable wastes in more excess of flower wastes, such as Dianchi coastal.
Olusesi, A D; Oyeniran, O
2017-05-01
Few studies have compared bilateral same-day with staged tympanoplasty using cartilage graft materials. A prospective randomised observational study was performed of 38 chronic suppurative otitis media patients (76 ears) who were assigned to undergo bilateral sequential same-day tympanoplasty (18 patients, 36 ears) or bilateral sequential tympanoplasty performed 3 months apart (20 patients, 40 ears). Disease duration, intra-operative findings, combined duration of surgery, post-operative graft appearance at 6 weeks, post-operative complications, re-do rate and relative cost of surgery were recorded. Tympanic membrane perforations were predominantly subtotal (p = 0.36, odds ratio = 0.75). Most grafts were harvested from the conchal cartilage and fewer from the tragus (p = 0.59, odds ratio = 1.016). Types of complication, post-operative hearing gain and revision rates were similar in both patient groups. Surgical outcomes are not significantly different for same-day and bilateral cartilage tympanoplasty, but same-day surgery has the added benefit of a lower cost.
14 CFR 125.209 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...
14 CFR 125.209 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...
14 CFR 125.209 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...
14 CFR 125.209 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...
14 CFR 125.209 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Emergency equipment: Extended overwater... Equipment Requirements § 125.209 Emergency equipment: Extended overwater operations. (a) No person may operate an airplane in extended overwater operations unless it carries, installed in conspicuously marked...
29 CFR 1926.605 - Marine operations and equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...
29 CFR 1926.605 - Marine operations and equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...
29 CFR 1926.605 - Marine operations and equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...
29 CFR 1926.605 - Marine operations and equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Marine operations and equipment. 1926.605 Section 1926.605 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION... Equipment, and Marine Operations § 1926.605 Marine operations and equipment. (a) Material handling...
A novel visual hardware behavioral language
NASA Technical Reports Server (NTRS)
Li, Xueqin; Cheng, H. D.
1992-01-01
Most hardware behavioral languages just use texts to describe the behavior of the desired hardware design. This is inconvenient for VLSI designers who enjoy using the schematic approach. The proposed visual hardware behavioral language has the ability to graphically express design information using visual parallel models (blocks), visual sequential models (processes) and visual data flow graphs (which consist of primitive operational icons, control icons, and Data and Synchro links). Thus, the proposed visual hardware behavioral language can not only specify hardware concurrent and sequential functionality, but can also visually expose parallelism, sequentiality, and disjointness (mutually exclusive operations) for the hardware designers. That would make the hardware designers capture the design ideas easily and explicitly using this visual hardware behavioral language.
Course Manual for X-Ray Applications (GS-463).
ERIC Educational Resources Information Center
Oregon State Univ., Corvallis. Dept. of General Science.
This publication is the third of three sequential course manuals for instructors in X-Ray science and engineering developed at Oregon State University. It consists of outlines of thirteen lectures, and six laboratory exercises with problems and three examinations. Also included is a list of references, equipment, and material. The purposes,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-01
... following methods: A. http://www.regulations.gov . Follow the on-line instructions for submitting comments... the equipment is in good working order, if necessary as part of the inspection; (6) idling of a... off school property during queuing for the sequential discharge or pickup of students where the...
Course Manual for X-Ray Measurements (GS-462).
ERIC Educational Resources Information Center
Oregon State Univ., Corvallis. Dept. of General Science.
This is the second of three sequential course manuals for instructors in X-Ray science and engineering developed at Oregon State University. It consists of outlines for fourteen lectures and eight laboratory exercises with problems and two examinations. Also included is a list of references, equipment, and materials. The purposes, teaching aids,…
Highway Maintenance Equipment Operator. Miscellaneous Equipment. Training Materials.
ERIC Educational Resources Information Center
Perky, Sandra Dutreau; And Others
This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes six units of instruction covering the small, specialized equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance…
Computer-Based Instruction for TRIDENT FBM Training
1976-06-01
remote voice feedback to an operator. In this case it is possible to display text which represents the voice messages required during sequential ...provides two main services: (a) the preparation of missiles for sequential launching with self-guidance after launch, and (b) the coordination of...monitor- ing the status of the guidance system in each missile. FCS SWS coordina- tion consists of monitoring systems involved in sequential functions at
49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...
49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...
49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...
49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...
49 CFR 236.6 - Hand-operated switch equipped with switch circuit controller.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Hand-operated switch equipped with switch circuit..., AND APPLIANCES Rules and Instructions: All Systems General § 236.6 Hand-operated switch equipped with switch circuit controller. Hand-operated switch equipped with switch circuit controller connected to the...
Highway Maintenance Equipment Operator. Specialized Equipment. Training Materials.
ERIC Educational Resources Information Center
Perky, Sandra Dutreau; And Others
This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes 18 units of instruction covering the large equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance objectives,…
Koopmeiners, Joseph S; Feng, Ziding
2011-01-01
The receiver operating characteristic (ROC) curve, the positive predictive value (PPV) curve and the negative predictive value (NPV) curve are three measures of performance for a continuous diagnostic biomarker. The ROC, PPV and NPV curves are often estimated empirically to avoid assumptions about the distributional form of the biomarkers. Recently, there has been a push to incorporate group sequential methods into the design of diagnostic biomarker studies. A thorough understanding of the asymptotic properties of the sequential empirical ROC, PPV and NPV curves will provide more flexibility when designing group sequential diagnostic biomarker studies. In this paper we derive asymptotic theory for the sequential empirical ROC, PPV and NPV curves under case-control sampling using sequential empirical process theory. We show that the sequential empirical ROC, PPV and NPV curves converge to the sum of independent Kiefer processes and show how these results can be used to derive asymptotic results for summaries of the sequential empirical ROC, PPV and NPV curves.
Koopmeiners, Joseph S.; Feng, Ziding
2013-01-01
The receiver operating characteristic (ROC) curve, the positive predictive value (PPV) curve and the negative predictive value (NPV) curve are three measures of performance for a continuous diagnostic biomarker. The ROC, PPV and NPV curves are often estimated empirically to avoid assumptions about the distributional form of the biomarkers. Recently, there has been a push to incorporate group sequential methods into the design of diagnostic biomarker studies. A thorough understanding of the asymptotic properties of the sequential empirical ROC, PPV and NPV curves will provide more flexibility when designing group sequential diagnostic biomarker studies. In this paper we derive asymptotic theory for the sequential empirical ROC, PPV and NPV curves under case-control sampling using sequential empirical process theory. We show that the sequential empirical ROC, PPV and NPV curves converge to the sum of independent Kiefer processes and show how these results can be used to derive asymptotic results for summaries of the sequential empirical ROC, PPV and NPV curves. PMID:24039313
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
... FR 10087) announcing the CSX Transportation Railroad's (CSXT) request for a waiver to operate RailRunner equipment in RailRunner only operations; operate RailRunner equipment commingled with RoadRailer bi-modal equipment; and RailRunner equipment operating behind various conventional railcars. On...
New technology and energy-saving equipment for production of composite materials
NASA Astrophysics Data System (ADS)
Romanovich, A. A.; Glagolev, S. N.; Babaevsky, A. N.
2018-03-01
The article considers industrial technology and energy-saving equipment for cement and composite binder production with a reduction in energy intensity of the process up to 50% due to the synergetic effect during mechanic activation of the raw mix with the replacement of part of the clinker component with the mineral hydro-active additive. The technological process is based on the sequential introduction of components in dispersed phases into the feed mixture in the grinding path and at the stage of product separation with certain dispersed characteristics. The increase in the energy efficiency of the line is achieved by the joint operation of the press roller aggregate, which is the development of BSTU named after V.G. Shoukhov, and rotor-vortex mills of a very fine grinding of a new design. The experienced design of the aggregate with the device for deagglomeration of the pressed tape allows combining the processes of grinding and disaggregation of the pressed material, thereby reducing the operating costs and increasing the efficiency of using the grinding unit. Comparative tests of cement samples obtained in energy-saving aggregates (PRA + RVM) are given which allowed establishing that their beam strength for compression and bending is higher by 15-20% than the traditional method obtained in a ball mill. An analytical expression is also given that allows one to determine the power consumed for the deagglomeration of crushed and pressed material between the main rolls, taking into account the geometric dimensions of the rolls and the physico-mechanical characteristics of the material.
1984-06-01
SEQUENTIAL TESTING (Bldg. A, Room C) 1300-1330 ’ 1330-1415 1415-1445 1445-1515 BREAK 1515-1545 A TRUNCATED SEQUENTIAL PROBABILITY RATIO TEST J...suicide optical data operational testing reliability random numbers bootstrap methods missing data sequential testing fire support complex computer model carcinogenesis studies EUITION Of 1 NOV 68 I% OBSOLETE a ...contributed papers can be ascertained from the titles of the
Sequential defense against random and intentional attacks in complex networks.
Chen, Pin-Yu; Cheng, Shin-Ming
2015-02-01
Network robustness against attacks is one of the most fundamental researches in network science as it is closely associated with the reliability and functionality of various networking paradigms. However, despite the study on intrinsic topological vulnerabilities to node removals, little is known on the network robustness when network defense mechanisms are implemented, especially for networked engineering systems equipped with detection capabilities. In this paper, a sequential defense mechanism is first proposed in complex networks for attack inference and vulnerability assessment, where the data fusion center sequentially infers the presence of an attack based on the binary attack status reported from the nodes in the network. The network robustness is evaluated in terms of the ability to identify the attack prior to network disruption under two major attack schemes, i.e., random and intentional attacks. We provide a parametric plug-in model for performance evaluation on the proposed mechanism and validate its effectiveness and reliability via canonical complex network models and real-world large-scale network topology. The results show that the sequential defense mechanism greatly improves the network robustness and mitigates the possibility of network disruption by acquiring limited attack status information from a small subset of nodes in the network.
CT fluoroscopy-assisted puncture of thoracic and abdominal masses: a randomized trial.
Kirchner, Johannes; Kickuth, Ralph; Laufer, Ulf; Schilling, Esther Maria; Adams, Stephan; Liermann, Dieter
2002-03-01
We investigated the benefit of real-time guidance of interventional punctures by means of computed tomography fluoroscopy (CTF) compared with the conventional sequential acquisition guidance. In a prospective randomized trial, 75 patients underwent either CTF-guided (group A, n = 50) or sequential CT-guided (group B, n = 25) punctures of thoracic (n = 29) or abdominal (n = 46) masses. CTF was performed on the CT machine (Somatom Plus 4 Power, Siemens Corp., Forchheim, Germany) equipped with the C.A.R.E. Vision application (tube voltage 120 kV, tube current 50 mA, rotational time 0.75 s, slice thickness 10 mm, 8 frames/s). The average procedure time showed a statistically significant difference between the two study groups (group A: 564 s, group B 795 s, P = 0.0032). The mean total mAs was 7089 mAs for the CTF and 4856 mAs for the sequential image-guided intervention, respectively. The sensitivity was 71% specificity 100% positive predictive value 100% and negative predictive value 60% for the CTF-guided puncture, and 68, 100, 100 and 50% for sequential CT, respectively. CTF guidance realizes a time-saving but increases the radiation exposure dosage.
Data analytics and optimization of an ice-based energy storage system for commercial buildings
Luo, Na; Hong, Tianzhen; Li, Hui; ...
2017-07-25
Ice-based thermal energy storage (TES) systems can shift peak cooling demand and reduce operational energy costs (with time-of-use rates) in commercial buildings. The accurate prediction of the cooling load, and the optimal control strategy for managing the charging and discharging of a TES system, are two critical elements to improving system performance and achieving energy cost savings. This study utilizes data-driven analytics and modeling to holistically understand the operation of an ice–based TES system in a shopping mall, calculating the system’s performance using actual measured data from installed meters and sensors. Results show that there is significant savings potential whenmore » the current operating strategy is improved by appropriately scheduling the operation of each piece of equipment of the TES system, as well as by determining the amount of charging and discharging for each day. A novel optimal control strategy, determined by an optimization algorithm of Sequential Quadratic Programming, was developed to minimize the TES system’s operating costs. Three heuristic strategies were also investigated for comparison with our proposed strategy, and the results demonstrate the superiority of our method to the heuristic strategies in terms of total energy cost savings. Specifically, the optimal strategy yields energy costs of up to 11.3% per day and 9.3% per month compared with current operational strategies. A one-day-ahead hourly load prediction was also developed using machine learning algorithms, which facilitates the adoption of the developed data analytics and optimization of the control strategy in a real TES system operation.« less
Data analytics and optimization of an ice-based energy storage system for commercial buildings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Luo, Na; Hong, Tianzhen; Li, Hui
Ice-based thermal energy storage (TES) systems can shift peak cooling demand and reduce operational energy costs (with time-of-use rates) in commercial buildings. The accurate prediction of the cooling load, and the optimal control strategy for managing the charging and discharging of a TES system, are two critical elements to improving system performance and achieving energy cost savings. This study utilizes data-driven analytics and modeling to holistically understand the operation of an ice–based TES system in a shopping mall, calculating the system’s performance using actual measured data from installed meters and sensors. Results show that there is significant savings potential whenmore » the current operating strategy is improved by appropriately scheduling the operation of each piece of equipment of the TES system, as well as by determining the amount of charging and discharging for each day. A novel optimal control strategy, determined by an optimization algorithm of Sequential Quadratic Programming, was developed to minimize the TES system’s operating costs. Three heuristic strategies were also investigated for comparison with our proposed strategy, and the results demonstrate the superiority of our method to the heuristic strategies in terms of total energy cost savings. Specifically, the optimal strategy yields energy costs of up to 11.3% per day and 9.3% per month compared with current operational strategies. A one-day-ahead hourly load prediction was also developed using machine learning algorithms, which facilitates the adoption of the developed data analytics and optimization of the control strategy in a real TES system operation.« less
Zhu, Jundong; Jiang, Fan; Li, Pu; Shao, Pengfei; Liang, Chao; Xu, Aiming; Miao, Chenkui; Qin, Chao; Wang, Zengjun; Yin, Changjun
2017-09-11
To explore the feasibility and safety of retroperitoneal laparoscopic partial nephrectomy with sequential segmental renal artery clamping for the patients with multiple renal tumor of who have solitary kidney or contralateral kidney insufficiency. Nine patients who have undergone retroperitoneal laparoscopic partial nephrectomy with sequential segmental renal artery clamping between October 2010 and January 2017 were retrospectively analyzed. Clinical materials and parameters during and after the operation were summarized. Nineteen tumors were resected in nine patients and the operations were all successful. The operation time ranged from 100 to 180 min (125 min); clamping time of segmental renal artery was 10 ~ 30 min (23 min); the amount of blood loss during the operation was 120 ~ 330 ml (190 ml); hospital stay after the operation is 3 ~ 6d (5d). There was no complication during the perioperative period, and the pathology diagnosis after the surgery showed that there were 13 renal clear cell carcinomas, two papillary carcinoma and four perivascular epithelioid cell tumors with negative margins from the 19 tumors. All patients were followed up for 3 ~ 60 months, and no local recurrence or metastasis was detected. At 3-month post-operation follow-up, the mean serum creatinine was 148.6 ± 28.1 μmol/L (p = 0.107), an increase of 3.0 μmol/L from preoperative baseline. For the patients with multiple renal tumors and solitary kidney or contralateral kidney insufficiency, retroperitoneal laparoscopic partial nephrectomy with sequential segmental renal artery clamping was feasible and safe, which minimized the warm ischemia injury to the kidney and preserved the renal function effectively.
Nickel release from surgical instruments and operating room equipment.
Boyd, Anne H; Hylwa, Sara A
2018-04-15
Background There has been no systematic study assessing nickel release from surgical instruments and equipment used within the operating suite. This equipment represents important potential sources of exposure for nickel-sensitive patients and hospital staff. To investigate nickel release from commonly used surgical instruments and operating room equipment. Using the dimethylglyoxime nickel spot test, a variety of surgical instruments and operating room equipment were tested for nickel release at our institution. Of the 128 surgical instruments tested, only 1 was positive for nickel release. Of the 43 operating room items tested, 19 were positive for nickel release, 7 of which have the potential for direct contact with patients and/or hospital staff. Hospital systems should be aware of surgical instruments and operating room equipment as potential sources of nickel exposure.
30 CFR 250.614 - Well-control fluids, equipment, and operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Well-control fluids, equipment, and operations... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.614 Well-control fluids, equipment, and operations. The following requirements apply during...
1988-10-03
full achievable region is achievable if there is only a bounded degree of asynchronism. E. Arikan , in a Ph.D. thesis [Ari85], extended sequential...real co-operation is required to reduce the number of transmissions to O(log log N). 14 REFERENCES [Ari85] E. Arikan , "Sequential Decoding for Multiple
Qin, Fangjun; Chang, Lubin; Jiang, Sai; Zha, Feng
2018-05-03
In this paper, a sequential multiplicative extended Kalman filter (SMEKF) is proposed for attitude estimation using vector observations. In the proposed SMEKF, each of the vector observations is processed sequentially to update the attitude, which can make the measurement model linearization more accurate for the next vector observation. This is the main difference to Murrell’s variation of the MEKF, which does not update the attitude estimate during the sequential procedure. Meanwhile, the covariance is updated after all the vector observations have been processed, which is used to account for the special characteristics of the reset operation necessary for the attitude update. This is the main difference to the traditional sequential EKF, which updates the state covariance at each step of the sequential procedure. The numerical simulation study demonstrates that the proposed SMEKF has more consistent and accurate performance in a wide range of initial estimate errors compared to the MEKF and its traditional sequential forms.
A Sequential Multiplicative Extended Kalman Filter for Attitude Estimation Using Vector Observations
Qin, Fangjun; Jiang, Sai; Zha, Feng
2018-01-01
In this paper, a sequential multiplicative extended Kalman filter (SMEKF) is proposed for attitude estimation using vector observations. In the proposed SMEKF, each of the vector observations is processed sequentially to update the attitude, which can make the measurement model linearization more accurate for the next vector observation. This is the main difference to Murrell’s variation of the MEKF, which does not update the attitude estimate during the sequential procedure. Meanwhile, the covariance is updated after all the vector observations have been processed, which is used to account for the special characteristics of the reset operation necessary for the attitude update. This is the main difference to the traditional sequential EKF, which updates the state covariance at each step of the sequential procedure. The numerical simulation study demonstrates that the proposed SMEKF has more consistent and accurate performance in a wide range of initial estimate errors compared to the MEKF and its traditional sequential forms. PMID:29751538
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 5 2010-10-01 2010-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 5 2011-10-01 2011-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 5 2014-10-01 2014-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Failure of slops discharge recording equipment; operating with, reporting failures, and replacing pollution equipment: Category A, B, C, D. 153.1130 Section... slops discharge recording equipment; operating with, reporting failures, and replacing pollution...
Silvabase: A flexible data file management system
NASA Technical Reports Server (NTRS)
Lambing, Steven J.; Reynolds, Sandra J.
1991-01-01
The need for a more flexible and efficient data file management system for mission planning in the Mission Operations Laboratory (EO) at MSFC has spawned the development of Silvabase. Silvabase is a new data file structure based on a B+ tree data structure. This data organization allows for efficient forward and backward sequential reads, random searches, and appends to existing data. It also provides random insertions and deletions with reasonable efficiency, utilization of storage space well but not at the expense of speed, and performance of these functions on a large volume of data. Mission planners required that some data be keyed and manipulated in ways not found in a commercial product. Mission planning software is currently being converted to use Silvabase in the Spacelab and Space Station Mission Planning Systems. Silvabase runs on a Digital Equipment Corporation's popular VAX/VMS computers in VAX Fortran. Silvabase has unique features involving time histories and intervals such as in operations research. Because of its flexibility and unique capabilities, Silvabase could be used in almost any government or commercial application that requires efficient reads, searches, and appends in medium to large amounts of almost any kind of data.
33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?
Code of Federal Regulations, 2013 CFR
2013-07-01
... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...
33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?
Code of Federal Regulations, 2010 CFR
2010-07-01
... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...
33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?
Code of Federal Regulations, 2014 CFR
2014-07-01
... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...
33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?
Code of Federal Regulations, 2012 CFR
2012-07-01
... LRIT equipment is switched off or fails to operate? 169.245 Section 169.245 Navigation and Navigable... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...
14 CFR 121.345 - Radio equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Radio equipment. 121.345 Section 121.345..., FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.345 Radio equipment. (a) No person may operate an airplane unless it is equipped with radio equipment required for the kind of...
46 CFR 109.347 - Pilot boarding equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...
46 CFR 109.347 - Pilot boarding equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...
TDRSS-user orbit determination using batch least-squares and sequential methods
NASA Astrophysics Data System (ADS)
Oza, D. H.; Jones, T. L.; Hakimi, M.; Samii, Mina V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.
1993-02-01
The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), and operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the January 17-23, 1991, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were less than 40 meters after the filter had reached steady state.
TDRSS-user orbit determination using batch least-squares and sequential methods
NASA Technical Reports Server (NTRS)
Oza, D. H.; Jones, T. L.; Hakimi, M.; Samii, Mina V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.
1993-01-01
The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), and operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the January 17-23, 1991, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were less than 40 meters after the filter had reached steady state.
A sequential extraction approach was utilized to estimate the distribution of arsenite [As(III)] and arsenate [As(V)] on iron oxide/hydroxide solids obtained from drinking water distribution systems. The arsenic (As) associated with these solids can be segregated into three oper...
Sequential extraction procedures are used to determine the solid-phase association in which elements of interest exist in soil and sediment matrices. Foundational work by Tessier et al. (1) has found widespread acceptance and has worked tolerably as an operational definition for...
S.M.P. SEQUENTIAL MATHEMATICS PROGRAM.
ERIC Educational Resources Information Center
CICIARELLI, V; LEONARD, JOSEPH
A SEQUENTIAL MATHEMATICS PROGRAM BEGINNING WITH THE BASIC FUNDAMENTALS ON THE FOURTH GRADE LEVEL IS PRESENTED. INCLUDED ARE AN UNDERSTANDING OF OUR NUMBER SYSTEM, AND THE BASIC OPERATIONS OF WORKING WITH WHOLE NUMBERS--ADDITION, SUBTRACTION, MULTIPLICATION, AND DIVISION. COMMON FRACTIONS ARE TAUGHT IN THE FIFTH, SIXTH, AND SEVENTH GRADES. A…
Philip A. Araman
1977-01-01
The design of a rough mill for the production of interior furniture parts is used to illustrate a simulation technique for analyzing and evaluating established and proposed sequential production systems. Distributions representing the real-world random characteristics of lumber, equipment feed speeds and delay times are programmed into the simulation. An example is...
Bis-reaction-trigger as a strategy to improve the selectivity of fluorescent probes.
Li, Dan; Cheng, Juan; Wang, Cheng-Kun; Ying, Huazhou; Hu, Yongzhou; Han, Feng; Li, Xin
2018-06-01
By the strategy of equipping a fluorophore with two reaction triggers that are tailored to the specific chemistry of peroxynitrite, we have developed a highly selective probe for detecting peroxynitrite in live cells. Sequential response by the two triggers enabled the probe to reveal various degrees of nitrosative stress in live cells via a sensitive emission colour change.
Microprocessor control of photovoltaic systems
NASA Technical Reports Server (NTRS)
Millner, A. R.; Kaufman, D. L.
1984-01-01
The present low power CMOS microprocessor controller for photovoltaic power systems possesses three programs, which are respectively intended for (1) conventional battery-charging systems with state-of-charge estimation and sequential shedding of subarrays and loads, (2) maximum power-controlled battery-charging systems, and (3) variable speed dc motor drives. Attention is presently given to the development of this terrestrial equipment for spacecraft use.
Code of Federal Regulations, 2010 CFR
2010-07-01
...? (a) For routine flushing of resin and gel coat application equipment (e.g., spray guns, flowcoaters... and gel coat application equipment cleaning operations? 63.5734 Section 63.5734 Protection of... Pollutants for Boat Manufacturing Standards for Resin and Gel Coat Application Equipment Cleaning Operations...
Burkness, Eric C; Hutchison, W D
2009-10-01
Populations of cabbage looper, Trichoplusiani (Lepidoptera: Noctuidae), were sampled in experimental plots and commercial fields of cabbage (Brasicca spp.) in Minnesota during 1998-1999 as part of a larger effort to implement an integrated pest management program. Using a resampling approach and the Wald's sequential probability ratio test, sampling plans with different sampling parameters were evaluated using independent presence/absence and enumerative data. Evaluations and comparisons of the different sampling plans were made based on the operating characteristic and average sample number functions generated for each plan and through the use of a decision probability matrix. Values for upper and lower decision boundaries, sequential error rates (alpha, beta), and tally threshold were modified to determine parameter influence on the operating characteristic and average sample number functions. The following parameters resulted in the most desirable operating characteristic and average sample number functions; action threshold of 0.1 proportion of plants infested, tally threshold of 1, alpha = beta = 0.1, upper boundary of 0.15, lower boundary of 0.05, and resampling with replacement. We found that sampling parameters can be modified and evaluated using resampling software to achieve desirable operating characteristic and average sample number functions. Moreover, management of T. ni by using binomial sequential sampling should provide a good balance between cost and reliability by minimizing sample size and maintaining a high level of correct decisions (>95%) to treat or not treat.
NASA Astrophysics Data System (ADS)
Piatyszek, E.; Voignier, P.; Graillot, D.
2000-05-01
One of the aims of sewer networks is the protection of population against floods and the reduction of pollution rejected to the receiving water during rainy events. To meet these goals, managers have to equip the sewer networks with and to set up real-time control systems. Unfortunately, a component fault (leading to intolerable behaviour of the system) or sensor fault (deteriorating the process view and disturbing the local automatism) makes the sewer network supervision delicate. In order to ensure an adequate flow management during rainy events it is essential to set up procedures capable of detecting and diagnosing these anomalies. This article introduces a real-time fault detection method, applicable to sewer networks, for the follow-up of rainy events. This method consists in comparing the sensor response with a forecast of this response. This forecast is provided by a model and more precisely by a state estimator: a Kalman filter. This Kalman filter provides not only a flow estimate but also an entity called 'innovation'. In order to detect abnormal operations within the network, this innovation is analysed with the binary sequential probability ratio test of Wald. Moreover, by crossing available information on several nodes of the network, a diagnosis of the detected anomalies is carried out. This method provided encouraging results during the analysis of several rains, on the sewer network of Seine-Saint-Denis County, France.
Code of Federal Regulations, 2013 CFR
2013-10-01
... person is restricted from operating a CMV equipped with any type of air brakes. (2) For the purposes of... person is restricted from operating a CMV equipped with any braking system operating fully on the air... restricted from operating a CMV equipped with a manual transmission. (2) For the purposes of the skills test...
Code of Federal Regulations, 2014 CFR
2014-10-01
... person is restricted from operating a CMV equipped with any type of air brakes. (2) For the purposes of... person is restricted from operating a CMV equipped with any braking system operating fully on the air... restricted from operating a CMV equipped with a manual transmission. (2) For the purposes of the skills test...
Code of Federal Regulations, 2012 CFR
2012-10-01
... person is restricted from operating a CMV equipped with any type of air brakes. (2) For the purposes of... person is restricted from operating a CMV equipped with any braking system operating fully on the air... restricted from operating a CMV equipped with a manual transmission. (2) For the purposes of the skills test...
30 CFR 56.9102 - Movement of independently operating rail equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... MINES Loading, Hauling, and Dumping Traffic Safety § 56.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same track shall...
30 CFR 57.9102 - Movement of independently operating rail equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement of independently operating rail... NONMETAL MINES Loading, Hauling, and Dumping Traffic Safety § 57.9102 Movement of independently operating rail equipment. Movement of two or more pieces of rail equipment operating independently on the same...
30 CFR 56.9101 - Operating speeds and control of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operating speeds and control of equipment. 56... Loading, Hauling, and Dumping Traffic Safety § 56.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...
30 CFR 56.9101 - Operating speeds and control of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operating speeds and control of equipment. 56... Loading, Hauling, and Dumping Traffic Safety § 56.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...
30 CFR 57.9101 - Operating speeds and control of equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Operating speeds and control of equipment. 57... Loading, Hauling, and Dumping Traffic Safety § 57.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...
30 CFR 57.9101 - Operating speeds and control of equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Operating speeds and control of equipment. 57... Loading, Hauling, and Dumping Traffic Safety § 57.9101 Operating speeds and control of equipment.... Operating speeds shall be consistent with conditions of roadways, tracks, grades, clearance, visibility, and...
49 CFR 195.430 - Firefighting equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Firefighting equipment. 195.430 Section 195.430... PIPELINE Operation and Maintenance § 195.430 Firefighting equipment. Each operator shall maintain adequate firefighting equipment at each pump station and breakout tank area. The equipment must be— (a) In proper...
Ezoe, Kentaro; Ohyama, Seiichi; Hashem, Md Abul; Ohira, Shin-Ichi; Toda, Kei
2016-02-01
After the Fukushima disaster, power generation from nuclear power plants in Japan was completely stopped and old coal-based power plants were re-commissioned to compensate for the decrease in power generation capacity. Although coal is a relatively inexpensive fuel for power generation, it contains high levels (mgkg(-1)) of selenium, which could contaminate the wastewater from thermal power plants. In this work, an automated selenium monitoring system was developed based on sequential hydride generation and chemiluminescence detection. This method could be applied to control of wastewater contamination. In this method, selenium is vaporized as H2Se, which reacts with ozone to produce chemiluminescence. However, interference from arsenic is of concern because the ozone-induced chemiluminescence intensity of H2Se is much lower than that of AsH3. This problem was successfully addressed by vaporizing arsenic and selenium individually in a sequential procedure using a syringe pump equipped with an eight-port selection valve and hot and cold reactors. Oxidative decomposition of organoselenium compounds and pre-reduction of the selenium were performed in the hot reactor, and vapor generation of arsenic and selenium were performed separately in the cold reactor. Sample transfers between the reactors were carried out by a pneumatic air operation by switching with three-way solenoid valves. The detection limit for selenium was 0.008 mg L(-1) and calibration curve was linear up to 1.0 mg L(-1), which provided suitable performance for controlling selenium in wastewater to around the allowable limit (0.1 mg L(-1)). This system consumes few chemicals and is stable for more than a month without any maintenance. Wastewater samples from thermal power plants were collected, and data obtained by the proposed method were compared with those from batchwise water treatment followed by hydride generation-atomic fluorescence spectrometry. Copyright © 2015 Elsevier B.V. All rights reserved.
Yan, Sheng; Zhu, Yuanqing; Tang, Shi-Yang; Li, Yuxing; Zhao, Qianbin; Yuan, Dan; Yun, Guolin; Zhang, Jun; Zhang, Shiwu; Li, Weihua
2018-04-01
Proteinuria is an established risk marker for progressive renal function loss and patients would significantly benefit from a point-of-care testing. Although extensive work has been done to develop the microfluidic devices for the detection of urinary protein, they need the complicated operation and bulky peripherals. Here, we present a rapid, maskless 3D prototyping for fabrication of capillary fluidic circuits using laser engraving. The capillary circuits can be fabricated in a short amount of time (<10 min) without the requirements of clean-room facilities and photomasks. The advanced capillary components (e.g., trigger valves, retention valves and retention bursting valves) were fabricated, enabling the sequential liquid delivery and sample-reagent mixing. With the integration of smartphone-based detection platform, the microfluidic device can quantify the urinary protein via a colorimetric analysis. By eliminating the bulky and expensive equipment, this smartphone-based detection platform is portable for on-site quantitative detection. © 2018 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Generating finite cyclic and dihedral groups using sequential insertion systems with interactions
NASA Astrophysics Data System (ADS)
Fong, Wan Heng; Sarmin, Nor Haniza; Turaev, Sherzod; Yosman, Ahmad Firdaus
2017-04-01
The operation of insertion has been studied extensively throughout the years for its impact in many areas of theoretical computer science such as DNA computing. First introduced as a generalization of the concatenation operation, many variants of insertion have been introduced, each with their own computational properties. In this paper, we introduce a new variant that enables the generation of some special types of groups called sequential insertion systems with interactions. We show that these new systems are able to generate all finite cyclic and dihedral groups.
Code of Federal Regulations, 2010 CFR
2010-07-01
... mobile equipment shall be equipped with a service brake system capable of stopping and holding the... which is not originally equipped with brakes unless the manner in which the equipment is being operated requires the use of brakes for safe operation. This standard does not apply to rail equipment. (2) If...
Code of Federal Regulations, 2010 CFR
2010-07-01
... mobile equipment shall be equipped with a service brake system capable of stopping and holding the... which is not originally equipped with brakes unless the manner in which the equipment is being operated requires the use of brakes for safe operation. This standard does not apply to rail equipment. (2) If...
30 CFR 57.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warnings prior to starting or moving equipment... NONMETAL MINES Machinery and Equipment Safety Practices and Operational Procedures § 57.14200 Warnings... equipment, equipment operators shall sound a warning that is audible above the surrounding noise level or...
30 CFR 57.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warnings prior to starting or moving equipment... NONMETAL MINES Machinery and Equipment Safety Practices and Operational Procedures § 57.14200 Warnings... equipment, equipment operators shall sound a warning that is audible above the surrounding noise level or...
Hemodynamic analysis of sequential graft from right coronary system to left coronary system.
Wang, Wenxin; Mao, Boyan; Wang, Haoran; Geng, Xueying; Zhao, Xi; Zhang, Huixia; Xie, Jinsheng; Zhao, Zhou; Lian, Bo; Liu, Youjun
2016-12-28
Sequential and single grafting are two surgical procedures of coronary artery bypass grafting. However, it remains unclear if the sequential graft can be used between the right and left coronary artery system. The purpose of this paper is to clarify the possibility of right coronary artery system anastomosis to left coronary system. A patient-specific 3D model was first reconstructed based on coronary computed tomography angiography (CCTA) images. Two different grafts, the normal multi-graft (Model 1) and the novel multi-graft (Model 2), were then implemented on this patient-specific model using virtual surgery techniques. In Model 1, the single graft was anastomosed to right coronary artery (RCA) and the sequential graft was adopted to anastomose left anterior descending (LAD) and left circumflex artery (LCX). While in Model 2, the single graft was anastomosed to LAD and the sequential graft was adopted to anastomose RCA and LCX. A zero-dimensional/three-dimensional (0D/3D) coupling method was used to realize the multi-scale simulation of both the pre-operative and two post-operative models. Flow rates in the coronary artery and grafts were obtained. The hemodynamic parameters were also showed, including wall shear stress (WSS) and oscillatory shear index (OSI). The area of low WSS and OSI in Model 1 was much less than that in Model 2. Model 1 shows optimistic hemodynamic modifications which may enhance the long-term patency of grafts. The anterior segments of sequential graft have better long-term patency than the posterior segments. With rational spatial position of the heart vessels, the last anastomosis of sequential graft should be connected to the main branch.
33 CFR 150.510 - How must tested emergency equipment be operated?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false How must tested emergency equipment be operated? 150.510 Section 150.510 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Operational Tests and Inspections (general) § 150.510 How must tested emergency equipment be operated? The...
33 CFR 150.510 - How must tested emergency equipment be operated?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false How must tested emergency equipment be operated? 150.510 Section 150.510 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... Operational Tests and Inspections (general) § 150.510 How must tested emergency equipment be operated? The...
Meisters, Julia; Diedenhofen, Birk; Musch, Jochen
2018-04-20
For decades, sequential lineups have been considered superior to simultaneous lineups in the context of eyewitness identification. However, most of the research leading to this conclusion was based on the analysis of diagnosticity ratios that do not control for the respondent's response criterion. Recent research based on the analysis of ROC curves has found either equal discriminability for sequential and simultaneous lineups, or higher discriminability for simultaneous lineups. Some evidence for potential position effects and for criterion shifts in sequential lineups has also been reported. Using ROC curve analysis, we investigated the effects of the suspect's position on discriminability and response criteria in both simultaneous and sequential lineups. We found that sequential lineups suffered from an unwanted position effect. Respondents employed a strict criterion for the earliest lineup positions, and shifted to a more liberal criterion for later positions. No position effects and no criterion shifts were observed in simultaneous lineups. This result suggests that sequential lineups are not superior to simultaneous lineups, and may give rise to unwanted position effects that have to be considered when conducting police lineups.
NASA Astrophysics Data System (ADS)
Zhukovskiy, Y.; Koteleva, N.
2017-10-01
Analysis of technical and technological conditions for the emergence of emergency situations during the operation of electromechanical equipment of enterprises of the mineral and raw materials complex shows that when developing the basis for ensuring safe operation, it is necessary to take into account not only the technical condition, but also the non-stationary operation of the operating conditions of equipment, and the nonstationarity of operational operating parameters of technological processes. Violations of the operation of individual parts of the machine, not detected in time, can lead to severe accidents at work, as well as to unplanned downtime and loss of profits. That is why, the issues of obtaining and processing Big data obtained during the life cycle of electromechanical equipment, for assessing the current state of the electromechanical equipment used, timely diagnostics of emergency and pre-emergency modes of its operation, estimating the residual resource, as well as prediction the technical state on the basis of machine learning are very important. This article is dedicated to developing the special method of data storing, collection and aggregation for definition of life-cycle resources of electromechanical equipment. This method can be used in working with big data and can allow extracting the knowledge from different data types: the plants’ historical data and the factory historical data. The data of the plants contains the information about electromechanical equipment operation and the data of the factory contains the information about a production of electromechanical equipment.
Optics education for machine operators in the semiconductor industry: moving beyond button pushing
NASA Astrophysics Data System (ADS)
Karakekes, Meg; Currier, Deborah
1995-10-01
In the competitive semiconductor manufacturing industry, employees who operate equipment are able to make greater contributions if they understand how the equipment works. By understanding the 'why' behind the 'what', the equipment operators can better partner with other technical staff to produce quality integrated circuits efficiently and effectively. This additional knowledge also opens equipment operators to job enrichment and enlargement opportunities. Advanced Micro Devices (AMD) is in the process of upgrading the skills of its equipment operators. This paper is an overview of a pilot program that employs optics education to upgrade stepper operators' skills. The paper starts with stepper tasks that require optics knowledge, examines teaching methods, reports both end-of-course and three months post-training knowledge retention, and summarizes how the training has impacted the production floor.
Early, James W.; Lester, Charles S.
2002-01-01
Optical fiber switches operated by electrical activation of at least one laser light modulator through which laser light is directed into at least one polarizer are used for the sequential transport of laser light from a single laser into a plurality of optical fibers. In one embodiment of the invention, laser light from a single excitation laser is sequentially transported to a plurality of optical fibers which in turn transport the laser light to separate individual remotely located laser fuel ignitors. The invention can be operated electro-optically with no need for any mechanical or moving parts, or, alternatively, can be operated electro-mechanically. The invention can be used to switch either pulsed or continuous wave laser light.
Sequential Analysis: Hypothesis Testing and Changepoint Detection
2014-07-11
it is necessary to estimate in situ the geographical coordinates and other parameters of earthquakes . The standard sensor equipment of a three...components. When an earthquake arises, the sensors begin to record several types of seismic waves (body and surface waves), among which the more important...machines and to increased safety norms. Many structures to be monitored, e.g., civil engineering structures subject to wind and earthquakes , aircraft
Portable-Beacon Landing System for Helicopters
NASA Technical Reports Server (NTRS)
Davis, Thomas J.; Clary, George R.; Chisholm, John P.; Macdonald, Stanley L.
1987-01-01
Prototype beacon landing system (BLS) allows helicopters to make precise landings in all weather. BLS easily added to existing helicopter avionic equipment and readily deployed at remote sites. Small and light, system employs X-band radar and digital processing. Variety of beams pulsed sequentially by ground station after initial interrogation by weather radar of approaching helicopter. Airborne microprocessor processes pulses to determine glide slope, course deviation, and range.
Finding False Paths in Sequential Circuits
NASA Astrophysics Data System (ADS)
Matrosova, A. Yu.; Andreeva, V. V.; Chernyshov, S. V.; Rozhkova, S. V.; Kudin, D. V.
2018-02-01
Method of finding false paths in sequential circuits is developed. In contrast with heuristic approaches currently used abroad, the precise method based on applying operations on Reduced Ordered Binary Decision Diagrams (ROBDDs) extracted from the combinational part of a sequential controlling logic circuit is suggested. The method allows finding false paths when transfer sequence length is not more than the given value and obviates the necessity of investigation of combinational circuit equivalents of the given lengths. The possibilities of using of the developed method for more complicated circuits are discussed.
Liu, Suna; Yang, Pu; Peng, Shiyong; Zhu, Chenghao; Cao, Shengyu; Li, Jian; Sun, Jiangtao
2017-01-17
A gold-catalyzed sequential annulation reaction to prepare 3,4-fused bicyclic furan compounds has been realized by employing 2-(1-alkynyl)-2-alken-1-ones and 1,3,5-triazines as the starting materials under mild reaction conditions. This protocol features multiple bond formation in a single operation with the incorporation of two nitrogen and two carbon atoms into the final products. A mechanistic investigation reveals that the sequential annulations involved an unprecedented stepwise [3+2+2]-cycloaddition.
Group-sequential three-arm noninferiority clinical trial designs
Ochiai, Toshimitsu; Hamasaki, Toshimitsu; Evans, Scott R.; Asakura, Koko; Ohno, Yuko
2016-01-01
We discuss group-sequential three-arm noninferiority clinical trial designs that include active and placebo controls for evaluating both assay sensitivity and noninferiority. We extend two existing approaches, the fixed margin and fraction approaches, into a group-sequential setting with two decision-making frameworks. We investigate the operating characteristics including power, Type I error rate, maximum and expected sample sizes, as design factors vary. In addition, we discuss sample size recalculation and its’ impact on the power and Type I error rate via a simulation study. PMID:26892481
2017-08-01
ARL-TN-0839 ● AUG 2017 US Army Research Laboratory User Guide: How to Use and Operate Virtual Reality Equipment in the Systems...ARL-TN-0839 ● AUG 2017 US Army Research Laboratory User Guide: How to Use and Operate Virtual Reality Equipment in the Systems...September 2017 4. TITLE AND SUBTITLE User Guide: How to Use and Operate Virtual Reality Equipment in the Systems Assessment and Usability Laboratory
40 CFR 243.201-2 - Recommended procedures: Operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... waste handling techniques, and in the proper operation of collection equipment, such as those presented in Operation Responsible: Safe Refuse Collection. (b) Personal protective equipment such as gloves... Standards for Subpart I—Personal Protective Equipment (29 CFR 1910.132 through 1910.137). (c) Scavenging...
40 CFR 243.201-2 - Recommended procedures: Operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... waste handling techniques, and in the proper operation of collection equipment, such as those presented in Operation Responsible: Safe Refuse Collection. (b) Personal protective equipment such as gloves... Standards for Subpart I—Personal Protective Equipment (29 CFR 1910.132 through 1910.137). (c) Scavenging...
Kittusamy, N Kumar; Buchholz, Bryan
2004-01-01
Operators of construction equipment perform various duties at work that expose them to a variety of risk factors that may lead to health problems. A few of the health hazards among operators of construction equipment are: (a) whole-body vibration, (b) awkward postural requirements (including static sitting), (c) dust, (d) noise, (e) temperature extremes, and (f) shift work. It has been suggested that operating engineers (OEs) are exposed to two important risk factors for the development of musculoskeletal disorders: whole-body vibration and non-neutral body postures. This review evaluates selected papers that have studied exposure to whole-body vibration and awkward posture among operators of mobile equipment. There have been only few studies that have specifically examined exposure of these risk factors among operators of construction equipment. Thus other studies from related industry and equipment were reviewed as applicable. In order to better understand whole-body vibration and postural stress among OEs, it is recommended that future studies are needed in evaluating these risk factors among OEs.
Hirakawa, Koji; Katayama, Masaaki; Soh, Nobuaki; Nakano, Koji; Imato, Toshihiko
2006-01-01
A rapid and sensitive immunoassay for the determination of vitellogenin (Vg) is described. The method involves a sequential injection analysis (SIA) system equipped with an amperometric detector and a neodymium magnet. Magnetic beads, onto which an antigen (Vg) was immobilized, were used as a solid support in an immunoassay. The introduction, trapping and release of magnetic beads in an immunoreaction cell were controlled by means of the neodymium magnet and by adjusting the flow of the carrier solution. The immunoassay was based on an indirect competitive immunoreaction of an alkaline phosphatase (ALP) labeled anti-Vg monoclonal antibody between the fraction of Vg immobilized on the magnetic beads and Vg in the sample solution. The immobilization of Vg on the beads involved coupling an amino group moiety of Vg with the magnetic beads after activation of a carboxylate moiety on the surface of magnetic beads that had been coated with a polylactate film. The Vg-immobilized magnetic beads were introduced and trapped in the immunoreaction cell equipped with the neodymium magnet; a Vg sample solution containing an ALP labeled anti-Vg antibody at a constant concentration and a p-aminophenyl phosphate (PAPP) solution were sequentially introduced into the immunoreaction cell. The product of the enzyme reaction of PAPP with ALP on the antibody, paminophenol, was transported to an amperometric detector, the applied voltage of which was set at +0.2 V vs. an Ag/AgCl reference electrode. A sigmoid calibration curve was obtained when the logarithm of the concentration of Vg was plotted against the peak current of the amperometric detector using various concentrations of standard Vg sample solutions (0-500 ppb). The time required for the analysis is less than 15 min.
Optimum target sizes for a sequential sawing process
H. Dean Claxton
1972-01-01
A method for solving a class of problems in random sequential processes is presented. Sawing cedar pencil blocks is used to illustrate the method. Equations are developed for the function representing loss from improper sizing of blocks. A weighted over-all distribution for sawing and drying operations is developed and graphed. Loss minimizing changes in the control...
... care for brachytherapy catheters. top of page What equipment is used? For permanent implants, radioactive material (which ... the tumor. top of page Who operates the equipment? The equipment is operated by a medical physicist, ...
ERIC Educational Resources Information Center
Naval Education and Training Program Development Center, Pensacola, FL.
The Rate Training Manual and Nonresident Career Course (RTM/NRCC) form a self-study package to assist Navy Equipment Operators First and Chief in fulfilling the requirements of their rating. (Navy Equipment Operators First and Chief direct and coordinate efforts of individuals and crews in construction, earthmoving, roadbuilding, quarrying, and…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
... operation of facilities, infrastructure, and equipment for use by DoD military or civilian should be...-7004, Safety of Facilities, Infrastructure, and Equipment for Military Operations. DFARS 246.270-1... operation of facilities. This includes contracts for facilities, infrastructure, and equipment configured...
NASA Technical Reports Server (NTRS)
Stute, Robert A. (Inventor); Galloway, F. Houston (Inventor); Medelius, Pedro J. (Inventor); Swindle, Robert W. (Inventor); Bierman, Tracy A. (Inventor)
1996-01-01
A remote monitor alarm system monitors discrete alarm and analog power supply voltage conditions at remotely located communications terminal equipment. A central monitoring unit (CMU) is connected via serial data links to each of a plurality of remote terminal units (RTUS) that monitor the alarm and power supply conditions of the remote terminal equipment. Each RTU can monitor and store condition information of both discrete alarm points and analog power supply voltage points in its associated communications terminal equipment. The stored alarm information is periodically transmitted to the CMU in response to sequential polling of the RTUS. The number of monitored alarm inputs and permissible voltage ranges for the analog inputs can be remotely configured at the CMU and downloaded into programmable memory at each RTU. The CMU includes a video display, a hard disk memory, a line printer and an audio alarm for communicating and storing the alarm information received from each RTU.
Laboratory services series: a programmed maintenance system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuxbury, D.C.; Srite, B.E.
1980-01-01
The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.
14 CFR 135.167 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...
14 CFR 135.167 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...
14 CFR 135.167 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...
14 CFR 135.167 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...
14 CFR 135.167 - Emergency equipment: Extended overwater operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Emergency equipment: Extended overwater... Aircraft and Equipment § 135.167 Emergency equipment: Extended overwater operations. (a) Except where the... of the certificate holder, the Administrator allows deviation for a particular extended overwater...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
14 CFR 121.358 - Low-altitude windshear system equipment requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Low-altitude windshear system equipment... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.358 Low-altitude windshear system equipment requirements. (a) Airplanes manufactured after January...
48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
...: SAFETY OF FACILITIES, INFRASTRUCTURE, AND EQUIPMENT FOR MILITARY OPERATIONS (OCT 2010) (a) Definition... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of Facilities, Infrastructure, and Equipment for Military Operations. 252.246-7004 Section 252.246-7004 Federal Acquisition...
14 CFR 105.13 - Radio equipment and use requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Radio equipment and use requirements. 105... (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES PARACHUTE OPERATIONS Operating Rules § 105.13 Radio...) The aircraft is equipped with a functioning two-way radio communication system appropriate to the air...
14 CFR 121.339 - Emergency equipment for extended over-water operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...
14 CFR 121.339 - Emergency equipment for extended over-water operations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...
14 CFR 121.339 - Emergency equipment for extended over-water operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...
14 CFR 121.339 - Emergency equipment for extended over-water operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...
14 CFR 121.339 - Emergency equipment for extended over-water operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Emergency equipment for extended over-water... § 121.339 Emergency equipment for extended over-water operations. (a) Except where the Administrator, by... certificate holder, the Administrator allows deviation for a particular extended overwater operation, no...
Maintenance of Mechanical Equipment in Minnesota Schools, 1968 Survey.
ERIC Educational Resources Information Center
Larson, R. E.; Rust, L. W.
Results of a one-year research program to study maintenance procedures for operating mechanical equipment were based on the determination of--(1) the present condition and level of performance of operating mechanical equipment, (2) the problems encountered by school administrators and custodial engineers pertaining to operating mechanical…
30 CFR 75.1725 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...
30 CFR 75.1725 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...
30 CFR 75.1725 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...
30 CFR 75.1725 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...
30 CFR 75.1725 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...
14 CFR 121.803 - Emergency medical equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Emergency medical equipment. 121.803... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Emergency Medical Equipment and Training § 121.803 Emergency medical equipment. (a) No person may operate a passenger-carrying airplane under this part unless...
14 CFR 125.223 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...
14 CFR 125.223 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...
14 CFR 135.175 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...
14 CFR 135.175 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...
14 CFR 135.175 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...
14 CFR 125.223 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...
14 CFR 135.175 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...
14 CFR 135.175 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...
14 CFR 125.223 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...
14 CFR 125.223 - Airborne weather radar equipment requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...
... deliver the daily treatments. top of page What equipment is used? Radiation oncologists use linear accelerators or ... accelerator page top of page Who operates the equipment? The equipment is operated by a radiation therapist, ...
NASA Astrophysics Data System (ADS)
Romanov, V. S.; Goldstein, V. G.
2018-01-01
In the organization of production and operation of submersible electric motors (ESP), as the most essential element of electric submersible plants (ESP) in the oil industry, it is necessary to consider specific operating conditions. The submersible electric motors (SEM) as most essential element of electrosubmersible installations (EI) in oil branch accounting of operation specific conditions is necessary in the process production and operation. They are determined by the conditions under which the EPU is operated. They are defined by the EPU operation conditions. For a complete picture the current state of the SED fleet in oil production, the results of its statistical analysis are given. For a comprehensive idea of the SEM park current state the results of statistical analysis are given in oil production. Currently, assessed the performance of submersible equipment produced by major manufacturers. Currently the operational characteristics assessment of the submersible equipment released by the main producers is given. It is stated that standard equipment cannot fully ensure efficient operation with the help of serial EIs, therefore new technologies and corresponding equipment are required to be developed. It is noted that the standard equipment could not provide fully effective operation by means of serial ESP therefore new technologies development and the corresponding equipment are required.
NASA Astrophysics Data System (ADS)
Nored, Donald L.
Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.
NASA Technical Reports Server (NTRS)
Nored, Donald L.
1990-01-01
Viewgraphs on Space Station Freedom Electrical Power System (EPS) WP-40 are presented. Topics covered include: key EPS technical requirements; photovoltaic power module systems; solar array assembly; blanket containment box and box positioning subassemblies; solar cell; bypass diode assembly; Kapton with atomic oxygen resistant coating; sequential shunt unit; gimbal assembly; energy storage subsystem; thermal control subsystem; direct current switching unit; integrated equipment assembly; PV cargo element; PMAD system; and PMC and AC architecture.
46 CFR 28.405 - Hydraulic equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2013-10-01 2013-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...
46 CFR 28.405 - Hydraulic equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2010-10-01 2010-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...
46 CFR 28.405 - Hydraulic equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2014-10-01 2014-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...
46 CFR 28.405 - Hydraulic equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2011-10-01 2011-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...
46 CFR 28.405 - Hydraulic equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... than four times the system maximum operating pressure. (c) Each hydraulic system must be equipped with... 46 Shipping 1 2012-10-01 2012-10-01 false Hydraulic equipment. 28.405 Section 28.405 Shipping... Operate With More Than 16 Individuals on Board § 28.405 Hydraulic equipment. (a) Each hydraulic system...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
30 CFR 75.1914 - Maintenance of diesel-powered equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... written standard operating procedures for such testing and evaluation that specify the following: (1) The... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75... the equipment is operated. (d) The intake air filter on diesel-powered equipment shall be replaced or...
29 CFR 1926.952 - Mechanical equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of each shift during which the equipment is to be used to determine that the brakes and operating systems are in proper working condition. (3) No employer shall use any motor vehicle equipment having an... certified for work on the proper voltage, mechanical equipment shall not be operated closer to any energized...
29 CFR 1926.952 - Mechanical equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of each shift during which the equipment is to be used to determine that the brakes and operating systems are in proper working condition. (3) No employer shall use any motor vehicle equipment having an... certified for work on the proper voltage, mechanical equipment shall not be operated closer to any energized...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2012 CFR
2012-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2012-10-01 2012-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2013 CFR
2013-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2013-10-01 2013-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2011 CFR
2011-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2011-10-01 2011-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2014 CFR
2014-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2014-10-01 2014-10-01 false Computers and data processing equipment (account...
49 CFR 1242.46 - Computers and data processing equipment (account XX-27-46).
Code of Federal Regulations, 2010 CFR
2010-10-01
... REPORTS SEPARATION OF COMMON OPERATING EXPENSES BETWEEN FREIGHT SERVICE AND PASSENGER SERVICE FOR RAILROADS 1 Operating Expenses-Equipment § 1242.46 Computers and data processing equipment (account XX-27-46... 49 Transportation 9 2010-10-01 2010-10-01 false Computers and data processing equipment (account...
40 CFR 63.986 - Nonflare control devices used for equipment leaks only.
Code of Federal Regulations, 2010 CFR
2010-07-01
... equipment leaks only. 63.986 Section 63.986 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... leaks only. (a) Equipment and operating requirements. (1) Owners or operators using a nonflare control device to meet the applicable requirements of a referencing subpart for equipment leaks shall meet the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... No. FMCSA-2005-23315] RIN 2126-AB37 Requirements for Intermodal Equipment Providers and for Motor Carriers and Drivers Operating Intermodal Equipment AGENCY: Federal Motor Carrier Safety Administration... driver- vehicle inspection report (DVIR) on an item of intermodal equipment (IME) when no damage, defects...
30 CFR 77.404 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...
30 CFR 77.404 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...
30 CFR 77.404 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...
30 CFR 77.404 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...
30 CFR 77.404 - Machinery and equipment; operation and maintenance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the power is off and the machinery is blocked against motion, except where machinery motion is... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Machinery and equipment; operation and... OF UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.404 Machinery and equipment...
Using Abstraction in Explicity Parallel Programs.
1991-07-01
However, we only rely on sequential consistency of memory operations. includ- ing reads. writes and any synchronization primitives provided by the...explicit synchronization primitives . This demonstrates the practical power of sequentially consistent memory, as opposed to weaker models of memory that...a small set of synchronization primitives , all pro- cedures have non-waiting specifications. This is in contrast to richer process-oriented
[Interface interconnection and data integration in implementing of digital operating room].
Feng, Jingyi; Chen, Hua; Liu, Jiquan
2011-10-01
The digital operating-room, with highly integrated clinical information, is very important for rescuing lives of patients and improving quality of operations. Since equipments in domestic operating-rooms have diversified interface and nonstandard communication protocols, designing and implementing an integrated data sharing program for different kinds of diagnosing, monitoring, and treatment equipments become a key point in construction of digital operating room. This paper addresses interface interconnection and data integration for commonly used clinical equipments from aspects of hardware interface, interface connection and communication protocol, and offers a solution for interconnection and integration of clinical equipments in heterogeneous environment. Based on the solution, a case of an optimal digital operating-room is presented in this paper. Comparing with the international solution for digital operating-room, the solution proposed in this paper is more economical and effective. And finally, this paper provides a proposal for the platform construction of digital perating-room as well as a viewpoint for standardization of domestic clinical equipments.
Equipment Operator 3 and 2. NAVTRA 10640-G. Rate Training Manual.
ERIC Educational Resources Information Center
Bureau of Naval Personnel, Washington, DC.
A guide for advancement and training in the Equipment Operator 3 and 2 ratings for Navy personnel is provided in this manual. The chapters outline the duties and responsibilities of the equipment operators involved with engines, fuels, lubricants, pollution control, automotive power trains and chassis, automotive vehicles, materials-handling…
30 CFR 56.12071 - Movement or operation of equipment near high-voltage power lines.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-voltage power lines. 56.12071 Section 56.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... NONMETAL MINES Electricity § 56.12071 Movement or operation of equipment near high-voltage power lines. When equipment must be moved or operated near energized high-voltage powerlines (other than trolley...
30 CFR 57.12071 - Movement or operation of equipment near high-voltage powerlines.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Movement or operation of equipment near high-voltage powerlines. 57.12071 Section 57.12071 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION...-voltage powerlines. When equipment must be moved or operated near energized high-voltage powerlines (other...
40 CFR 65.3 - Compliance with standards and operation and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
...)(4)(i) and (ii) do not apply to Group 2A or Group 2B process vents. Compliance with design, equipment, work practice, and operational standards, including those for equipment leaks, shall be determined... this part. (5) Design, equipment, work practice, or operational standards. Paragraphs (b)(5)(i) and (ii...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Canfield, K.J.
1984-05-01
An EMCS (Energy Monitoring and Control System) can be described as a system that automatically takes care of routine operation of equipment and provides centralized reporting and override capabilities. Equipment controlled by an EMCS would be heating, ventilating, and air conditioning (HVAC) equipment, air compressors, and small package boiler units. The EMCS would obtain raw information (data) from sensors associated with the equipment and massage the data into useful information. The information obtained from the sensors plus additional information available to the EMCS would be used to control the equipment. The information would also be available to the operator inmore » the form of reports or in response to operator commands for specific information. EMCS are computerized systems that control and monitor energy consuming and producing equipment at Naval facilities. The larger systems have been installed with color-graphics cathode ray tube operator consoles to provide better information to the personnel operating these systems. This report summarizes the work done on defining an adequate operator console and recommends changes to the existing EMCS Guide Specifications.« less
Mir-Tutusaus, J A; Sarrà, M; Caminal, G
2016-11-15
Hospital wastewaters have a high load of pharmaceutical active compounds (PhACs). Fungal treatments could be appropriate for source treatment of such effluents but the transition to non-sterile conditions proved to be difficult due to competition with indigenous microorganisms, resulting in very short-duration operations. In this article, coagulation-flocculation and UV-radiation processes were studied as pretreatments to a fungal reactor treating non-sterile hospital wastewater in sequential batch operation and continuous operation modes. The influent was spiked with ibuprofen and ketoprofen, and both compounds were successfully degraded by over 80%. UV pretreatment did not extent the fungal activity after coagulation-flocculation measured as laccase production and pellet integrity. Sequential batch operation did not reduce bacteria competition during fungal treatment. The best strategy was the addition of a coagulation-flocculation pretreatment to a continuous reactor, which led to an operation of 28days without biomass renovation. Copyright © 2016 Elsevier B.V. All rights reserved.
A microfluidic timer for timed valving and pumping in centrifugal microfluidics.
Schwemmer, F; Zehnle, S; Mark, D; von Stetten, F; Zengerle, R; Paust, N
2015-03-21
Accurate timing of microfluidic operations is essential for the automation of complex laboratory workflows, in particular for the supply of sample and reagents. Here we present a new unit operation for timed valving and pumping in centrifugal microfluidics. It is based on temporary storage of pneumatic energy and time delayed sudden release of said energy. The timer is loaded at a relatively higher spinning frequency. The countdown is started by reducing to a relatively lower release frequency, at which the timer is released after a pre-defined delay time. We demonstrate timing for 1) the sequential release of 4 liquids at times of 2.7 s ± 0.2 s, 14.0 s ± 0.5 s, 43.4 s ± 1.0 s and 133.8 s ± 2.3 s, 2) timed valving of typical assay reagents (contact angles 36-78°, viscosities 0.9-5.6 mPa s) and 3) on demand valving of liquids from 4 inlet chambers in any user defined sequence controlled by the spinning protocol. The microfluidic timer is compatible to all wetting properties and viscosities of common assay reagents and does neither require assistive equipment, nor coatings. It can be monolithically integrated into a microfluidic test carrier and is compatible to scalable fabrication technologies such as thermoforming or injection molding.
Fonoff, Erich Talamoni; Azevedo, Angelo; Angelos, Jairo Silva Dos; Martinez, Raquel Chacon Ruiz; Navarro, Jessie; Reis, Paul Rodrigo; Sepulveda, Miguel Ernesto San Martin; Cury, Rubens Gisbert; Ghilardi, Maria Gabriela Dos Santos; Teixeira, Manoel Jacobsen; Lopez, William Omar Contreras
2016-07-01
OBJECT Currently, bilateral procedures involve 2 sequential implants in each of the hemispheres. The present report demonstrates the feasibility of simultaneous bilateral procedures during the implantation of deep brain stimulation (DBS) leads. METHODS Fifty-seven patients with movement disorders underwent bilateral DBS implantation in the same study period. The authors compared the time required for the surgical implantation of deep brain electrodes in 2 randomly assigned groups. One group of 28 patients underwent traditional sequential electrode implantation, and the other 29 patients underwent simultaneous bilateral implantation. Clinical outcomes of the patients with Parkinson's disease (PD) who had undergone DBS implantation of the subthalamic nucleus using either of the 2 techniques were compared. RESULTS Overall, a reduction of 38.51% in total operating time for the simultaneous bilateral group (136.4 ± 20.93 minutes) as compared with that for the traditional consecutive approach (220.3 ± 27.58 minutes) was observed. Regarding clinical outcomes in the PD patients who underwent subthalamic nucleus DBS implantation, comparing the preoperative off-medication condition with the off-medication/on-stimulation condition 1 year after the surgery in both procedure groups, there was a mean 47.8% ± 9.5% improvement in the Unified Parkinson's Disease Rating Scale Part III (UPDRS-III) score in the simultaneous group, while the sequential group experienced 47.5% ± 15.8% improvement (p = 0.96). Moreover, a marked reduction in the levodopa-equivalent dose from preoperatively to postoperatively was similar in these 2 groups. The simultaneous bilateral procedure presented major advantages over the traditional sequential approach, with a shorter total operating time. CONCLUSIONS A simultaneous stereotactic approach significantly reduces the operation time in bilateral DBS procedures, resulting in decreased microrecording time, contributing to the optimization of functional stereotactic procedures.
NASA Technical Reports Server (NTRS)
Habibi, A.; Batson, B.
1976-01-01
Space Shuttle will be using a field-sequential color television system for the first few missions, but the present plans are to switch to a NTSC color TV system for future missions. The field-sequential color TV system uses a modified black and white camera, producing a TV signal with a digital bandwidth of about 60 Mbps. This article discusses the characteristics of the Shuttle TV systems and proposes a bandwidth-compression technique for the field-sequential color TV system that could operate at 13 Mbps to produce a high-fidelity signal. The proposed bandwidth-compression technique is based on a two-dimensional DPCM system that utilizes temporal, spectral, and spatial correlation inherent in the field-sequential color TV imagery. The proposed system requires about 60 watts and less than 200 integrated circuits.
NASA Astrophysics Data System (ADS)
Oza, D. H.; Jones, T. L.; Feiertag, R.; Samii, M. V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.
The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite (TDRS) System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the May 18-24, 1992, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. During this period, there were two separate orbit-adjust maneuvers on one of the TDRSS spacecraft (TDRS-East) and one small orbit-adjust maneuver for Landsat-4. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were generally less than 30 meters after the filter had reached steady state.
NASA Technical Reports Server (NTRS)
Oza, D. H.; Jones, T. L.; Feiertag, R.; Samii, M. V.; Doll, C. E.; Mistretta, G. D.; Hart, R. C.
1993-01-01
The Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) commissioned Applied Technology Associates, Incorporated, to develop the Real-Time Orbit Determination/Enhanced (RTOD/E) system on a Disk Operating System (DOS)-based personal computer (PC) as a prototype system for sequential orbit determination of spacecraft. This paper presents the results of a study to compare the orbit determination accuracy for a Tracking and Data Relay Satellite (TDRS) System (TDRSS) user spacecraft, Landsat-4, obtained using RTOD/E, operating on a PC, with the accuracy of an established batch least-squares system, the Goddard Trajectory Determination System (GTDS), operating on a mainframe computer. The results of Landsat-4 orbit determination will provide useful experience for the Earth Observing System (EOS) series of satellites. The Landsat-4 ephemerides were estimated for the May 18-24, 1992, timeframe, during which intensive TDRSS tracking data for Landsat-4 were available. During this period, there were two separate orbit-adjust maneuvers on one of the TDRSS spacecraft (TDRS-East) and one small orbit-adjust maneuver for Landsat-4. Independent assessments were made of the consistencies (overlap comparisons for the batch case and covariances and the first measurement residuals for the sequential case) of solutions produced by the batch and sequential methods. The forward-filtered RTOD/E orbit solutions were compared with the definitive GTDS orbit solutions for Landsat-4; the solution differences were generally less than 30 meters after the filter had reached steady state.
49 CFR 605.12 - Use of project equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., facilities or equipment funded under the Acts. A grantee or operator may, however, use such buses, facilities... 49 Transportation 7 2010-10-01 2010-10-01 false Use of project equipment. 605.12 Section 605.12..., DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.12 Use of project equipment...
7 CFR 501.11 - Mobile equipment and pedestrian traffic.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 6 2010-01-01 2010-01-01 false Mobile equipment and pedestrian traffic. 501.11... § 501.11 Mobile equipment and pedestrian traffic. (a) Drivers, operators, or pilots of all equipment... activity, shall operate in a careful and safe manner at all times and shall comply with the signals and...
29 CFR 1926.952 - Mechanical equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of each shift during which the equipment is to be used to determine that the brakes and operating systems are in proper working condition. (3) No employer shall use any motor vehicle equipment having an... shall not be operated closer to any energized line or equipment than the clearances set forth in § 1926...
30 CFR 75.503-1 - Statement listing all electric face equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...
30 CFR 75.503-1 - Statement listing all electric face equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...
30 CFR 75.503-1 - Statement listing all electric face equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...
30 CFR 75.503-1 - Statement listing all electric face equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall... Electrical Survey” and Form 6-1496 Supplemental entitled “Operator's Survey of Electrical Face Equipment...
7 CFR 1400.104 - Changes in farming operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (4) A change in ownership by sale or gift of equipment from a person or legal entity previously.... The sale or gift of equipment will be considered to be bona fide and substantive only if: (i) The... farming operation, (ii) The sale or gift of the equipment was based on the equipment's fair market value...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., Transmission and Distribution § 60.5402 What are the alternative emission limitations for equipment leaks from... emissions achieved under any design, equipment, work practice or operational standard, the Administrator... to the reduction in VOC emissions achieved under the design, equipment, work practice or operational...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., Transmission and Distribution § 60.5402 What are the alternative emission limitations for equipment leaks from... emissions achieved under any design, equipment, work practice or operational standard, the Administrator... to the reduction in VOC emissions achieved under the design, equipment, work practice or operational...
United States Air Force Analysis Extract AFSC 2A6X4 Aircraft Fuel Systems (Active Duty)
2001-02-01
8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers ACTIVE...8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers ...equip use/oper - Rollers or Stitchers USAFE AETC PACAF AFSOC ACC AMC AFMC
United States Air Force Analysis Extract AFSC 2A6X4 Aircraft Fuel Systems (ANG/AFRC)
2001-02-01
8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers ...8217 V0226 Spec tools/equip use/oper - Rollers or Stitchers ANG ANG ANG RES RES...8217AFOMS (AETC) Randolph AFB TX’ V0226 Spec tools/equip use/oper - Rollers or Stitchers
Development of Army Facility Functionality Assessment Criteria and Procedures
2010-09-01
critical facility types: the Tactical Equipment Main- tenance Facility (TEMF), the Company Operations Facility (COF), the Bat- talion Headquarters...Criteria for Company Operations Facilities (COF) ................ 56 Appendix G: Army Standard Design Criteria for Tactical Equipment Maintenance...1 mission-critical facility types: the Tactical Equipment Mainten- ance Facility (TEMF), the Company Operations Facility (COF), the Batta- lion
Worker safety and injury severity analysis of earthmoving equipment accidents.
Kazan, Emrah; Usmen, Mumtaz A
2018-06-01
Research on construction worker safety associated with construction equipment has mostly focused on accident type rather than injury severity and the embedded factor relationships. Significant variables and their effects on the degree of injury are examined for earthmoving equipment using data from OSHA. Four types of equipment, backhoe, bulldozer, excavator, and scraper are included in the study. Accidents involving on-foot workers and equipment operators are investigated collectively, as well as separately. Cross tabulation analysis was conducted to establish the associations between selected categorical variables, using degree of injury as a dichotomous dependent variable (fatal vs. nonfatal) and a number of independent variables having different values. Odds ratios were calculated to determine how much a certain variable/factor increases the odds of fatality in an accident, and the odds ratios were ranked to determine the relative impact of a given factor. It was found that twelve variables were significantly associated with injury severity. Rankings based on odds ratios showed that inadequate safety training (2.54), missing equipment protective system (2.38), being a non-union worker (2.26), being an equipment operator (1.93), and being on or around inadequately maintained equipment (1.58) produced higher odds for fatality. A majority of the earthmoving equipment accidents resulted in fatality. Backhoes were the most common equipment involved in accidents and fatalities. Struck-by accidents were the most prevalent and most fatal. Non-OSHA compliant safety training, missing seatbelt, operator not using seatbelt, malfunctioning back-up alarms, and poorly maintained equipment were factors contributing to accidents and fatalities. On-foot workers experienced a higher number of accidents than operators, while fatality odds were higher for the operators. Practical applications: Safety professionals should benefit from our findings in planning and delivering training and providing oversight to workers in earthmoving equipment operations. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.
Evaluation of fuel equipment operability of diesel locomotive engine with use of infrared receivers
NASA Astrophysics Data System (ADS)
Ovcharenko, S. M.; Balagin, O. V.; Balagin, D. V.
2018-03-01
This paper provides results of modelling the heat liberation in high-pressure pipeline of fuel equipment of diesel locomotive engines. Functional relationships between the technical state of fuel equipment and temperature of the outer surface of the high-pressure fuel pipeline are presented using the example of diesel locomotive engine 1-PD4D. The paper shows results of operational tests of the developed method for control of fuel equipment operability of diesel locomotive.
2014-10-15
ISS041E074458 (10/15/2014) --- NASA Flight Engineers Reid Wiseman and Barry Wilmore ventured out to the starboard truss of the International Space Station to remove and replace a power regulator known as a sequential shunt unit, which failed back in mid-May. The two spacewalkers also moved TV and camera equipment in preparation for the relocation of the Leonardo Permanent Multipurpose Module to accommodate the installation of new docking adapters for future commercial crew vehicles.
A Guide for Collecting Seismic, Acoustic, and Magnetic Data for Multiple Uses
1975-01-01
time, simul- (- taneously for the analog technique or sequentially for the digital tech- nique. Both methods require that precision timing networks be...with a precise voltage proportional to the sensitivity of the magnetometer . Whenever any electronic equip- ment affecting cal.bration has to be replaced...described as precisely as possible, including (but not limited to) the following: a. Name of source b. Continuous or transient c. Distance from geophone
An experimental study of perforated muzzle brakes
NASA Astrophysics Data System (ADS)
Dillon, R. E., Jr.; Nagamatsu, H. T.
1984-06-01
A firing test was conducted to examine the recoil efficiency and blast characteristics of perforated muzzle brakes fitted to a 20 mm cannon. Recoil impulse blast overpressures, muzzle velocity, sequential spark shadowgraphs, and photographs of the muzzle flash structure were obtained. Three different nuzzle devices were used with one device equipped with pressure transducers to measure the static pressure in the brake. Experimental results are compared with the earlier predictions of Dillon and Nagamatsu.
46 CFR 232.5 - Income Statement Accounts.
Code of Federal Regulations, 2012 CFR
2012-10-01
... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...
46 CFR 232.5 - Income Statement Accounts.
Code of Federal Regulations, 2011 CFR
2011-10-01
... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...
46 CFR 232.5 - Income Statement Accounts.
Code of Federal Regulations, 2014 CFR
2014-10-01
... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...
46 CFR 232.5 - Income Statement Accounts.
Code of Federal Regulations, 2013 CFR
2013-10-01
... as terminal operations, cargo equipment, fleet operations, cargo pooling agreements, container... revenue from pooling agreements, terminal services provided to others, and cargo handling services performed for others; cargo equipment rentals, and repairs to cargo equipment belonging to others; agency...
Code of Federal Regulations, 2011 CFR
2011-07-01
... DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Personal Protective Equipment § 150.608 Who is...) Each deepwater port operator must ensure that all personnel wear personal protective equipment when... that the personnel use or wear protective equipment and are trained in its use? 150.608 Section 150.608...
Code of Federal Regulations, 2010 CFR
2010-07-01
... DEEPWATER PORTS: OPERATIONS Workplace Safety and Health Personal Protective Equipment § 150.608 Who is...) Each deepwater port operator must ensure that all personnel wear personal protective equipment when... that the personnel use or wear protective equipment and are trained in its use? 150.608 Section 150.608...
Rapid code acquisition algorithms employing PN matched filters
NASA Technical Reports Server (NTRS)
Su, Yu T.
1988-01-01
The performance of four algorithms using pseudonoise matched filters (PNMFs), for direct-sequence spread-spectrum systems, is analyzed. They are: parallel search with fix dwell detector (PL-FDD), parallel search with sequential detector (PL-SD), parallel-serial search with fix dwell detector (PS-FDD), and parallel-serial search with sequential detector (PS-SD). The operation characteristic for each detector and the mean acquisition time for each algorithm are derived. All the algorithms are studied in conjunction with the noncoherent integration technique, which enables the system to operate in the presence of data modulation. Several previous proposals using PNMF are seen as special cases of the present algorithms.
Generalized bipartite quantum state discrimination problems with sequential measurements
NASA Astrophysics Data System (ADS)
Nakahira, Kenji; Kato, Kentaro; Usuda, Tsuyoshi Sasaki
2018-02-01
We investigate an optimization problem of finding quantum sequential measurements, which forms a wide class of state discrimination problems with the restriction that only local operations and one-way classical communication are allowed. Sequential measurements from Alice to Bob on a bipartite system are considered. Using the fact that the optimization problem can be formulated as a problem with only Alice's measurement and is convex programming, we derive its dual problem and necessary and sufficient conditions for an optimal solution. Our results are applicable to various practical optimization criteria, including the Bayes criterion, the Neyman-Pearson criterion, and the minimax criterion. In the setting of the problem of finding an optimal global measurement, its dual problem and necessary and sufficient conditions for an optimal solution have been widely used to obtain analytical and numerical expressions for optimal solutions. Similarly, our results are useful to obtain analytical and numerical expressions for optimal sequential measurements. Examples in which our results can be used to obtain an analytical expression for an optimal sequential measurement are provided.
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 8 2013-07-01 2013-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 8 2012-07-01 2012-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 8 2014-07-01 2014-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
29 CFR 1926.1408 - Power line safety (up to 350 kV)-equipment operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Power line safety (up to 350 kV)-equipment operations. 1926... Derricks in Construction § 1926.1408 Power line safety (up to 350 kV)—equipment operations. (a) Hazard... for use and conditions of use. Table A—Minimum Clearance Distances Voltage(nominal, kV, alternating...
30 CFR 57.9316 - Notifying the equipment operator.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 57.9316 Notifying the equipment operator. When an operator of self-propelled mobile...
30 CFR 56.9316 - Notifying the equipment operator.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9316 Notifying the equipment operator. When an operator of self-propelled mobile...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
49 CFR 218.91 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION RAILROAD OPERATING PRACTICES Handling Equipment, Switches, and Fixed Derails... can result from the mishandling of equipment, switches, and fixed derails. (b) This subpart prescribes minimum operating rule requirements for the handling of equipment, switches, and fixed derails. Each...
NASA Astrophysics Data System (ADS)
Gallagher, C. B.; Ferraro, A.
2018-05-01
A possible alternative to the standard model of measurement-based quantum computation (MBQC) is offered by the sequential model of MBQC—a particular class of quantum computation via ancillae. Although these two models are equivalent under ideal conditions, their relative resilience to noise in practical conditions is not yet known. We analyze this relationship for various noise models in the ancilla preparation and in the entangling-gate implementation. The comparison of the two models is performed utilizing both the gate infidelity and the diamond distance as figures of merit. Our results show that in the majority of instances the sequential model outperforms the standard one in regard to a universal set of operations for quantum computation. Further investigation is made into the performance of sequential MBQC in experimental scenarios, thus setting benchmarks for possible cavity-QED implementations.
Mariner Mars 1971 science operational support equipment
NASA Technical Reports Server (NTRS)
1971-01-01
The Mariner Mars 1971 science operational support equipment (SOSE) was developed to support the checkout of the proof test model and flight spacecraft. The test objectives of the SOSE and how these objectives were implemented are discussed. Attention is focused on the computer portion of the SOSE, since incorporation of a computer in ground checkout equipment represents a major departure from the support equipment concepts previously used. A functional description of the major hardware elements contained in the SOSE is also included, along with the operational performance of the SOSE during spacecraft testing.
Computer Maintenance Operations Center (CMOC), additional computer support equipment ...
Computer Maintenance Operations Center (CMOC), additional computer support equipment - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA
Research on the Mean Logistic Delay Time of the Development Phrass
NASA Astrophysics Data System (ADS)
Na, Hou; Yi, Li; Wang, Yi-Gang; Liu, Jun-jie; Bo, Zhang; Lv, Xue-Zhi
MIDT is a key parameter affecting operational availability though equipment designing, operation and support management. In operation process, how to strengthen the support management, layout rationally supports resource, provide support resource of the equipment maintenance, in order to avoid or reduce support; ensure MLDT satisfied to Ao's requests. It's an urgently solved question that how to assort with the RMS of equipment.
Deep Space Network equipment performance, reliability, and operations management information system
NASA Technical Reports Server (NTRS)
Cooper, T.; Lin, J.; Chatillon, M.
2002-01-01
The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.
1998-06-01
4] By 2010, we should be able to change how we conduct the most intense joint operations. Instead of relying on massed forces and sequential ...not independent, sequential steps. Data probes to support the analysis phase were required to complete the logical models. This generated a need...Networks) Identify Granularity (System Level) - Establish Physical Bounds or Limits to Systems • Determine System Test Configuration and Lineup
Material growth and characterization directed toward improving III-V heterojunction solar cells
NASA Technical Reports Server (NTRS)
Stefanakos, E. K.; Alexander, W. E.; Collis, W.; Abul-Fadl, A.
1979-01-01
In addition to the existing materials growth laboratory, the photolithographic facility and the device testing facility were completed. The majority of equipment for data acquisition, solar cell testing, materials growth and device characterization were received and are being put into operation. In the research part of the program, GaAs and GaA1As layers were grown reproducibly on GaAs substrates. These grown layers were characterized as to surface morphology, thickness and thickness uniformity. The liquid phase epitaxial growth process was used to fabricate p-n junctions in Ga(1-x)A1(x)As. Sequential deposition of two alloy layers was accomplished and detailed analysis of the effect of substrate quality and dopant on the GaA1As layer quality is presented. Finally, solar cell structures were formed by growing a thin p-GaA1As layer upon an epitaxial n-GaA1As layer. The energy gap corresponding to the long wavelength cutoff of the spectral response characteristic was 1.51-1.63 eV. Theoretical calculations of the spectral response were matched to the measured response.
Expandable endoprostheses in malignant bone tumors in children: indications and limitations.
Baumgart, Rainer; Lenze, Ulrich
2009-01-01
Expandable endoprostheses can be an option after resection of malignant bone tumors of the lower extremity in children and adolescents not only to bridge the resultant surgical defect but also to correct a residual limb length discrepancy. Small intramedullary diameter and short residual bone segments, as well as stress-shielding, are intrinsic technical limitations of fully implantable reconstructive devices. As a consequence, until recently, repeated operative interventions to reconstruct the limb and compensate for subsequent absence of growth within the affected limb were required to compensate for continued growth of the contralateral limb. Innovative expandable endoprosthetic devices are now available to help achieve equal limb length at maturity. One common device is a conventional endoprosthesis that is lengthened using a telescopic module, whereas the "bioexpandable" system lengthens the remaining bone using a lengthening nail as a modular part of the endoprosthesis. Both systems are equipped with motor drives that electromagnetic waves activate transcutaneously. One advantage of the "bioexpandable" endoprosthesis is that with sequential lengthening, the proportion of residual bone shaft to prosthesis length increases, thereby diminishing host bone-endoprosthetic lever arm forces.
NASA Astrophysics Data System (ADS)
Laurent, D.
Soviet and U.S. programs involving satellites for surveillance of ships and submarines are discussed, considering differences in approaches. The Soviet program began with the Cosmos 198 in 1967 and the latest, the Cosmos 1400 series, 15 m long and weighing 5 tons, carry radar for monitoring ships and a nuclear reactor for a power supply. Other Soviet spacecraft carrying passive microwave sensors and ion drives powered by solar panels have recently been detonated in orbit for unknown reasons. It has also been observed that the Soviet satellites are controlled in pairs, with sequential orbital changes for one following the other, and both satellites then overflying the same points. In contrast, U.S. surveillance satellites have been placed in higher orbits, thus placing greater demands on the capabilities of the on-board radar and camera systems. Project White Cloud and the Clipper Bow program are described, noting the continued operation of the White Cloud spacecraft, which are equipped to intercept radio signals from surface ships. Currently, the integrated tactical surveillance system program has completed its study and a decision is expected soon.
Mars habitat modules: launch, scaling and functional design considerations.
Bell, Larry; Hines, Gerald D
2005-07-01
The Sasakawa International Center for Space Architecture (SICSA) is undertaking a multi-year research, planning and design study that is exploring near- and long-term commercial space development opportunities. The central goal of this activity is to conceptualize a scenario of sequential, integrated private enterprise initiatives that can carry humankind forward to Mars. Each development stage is planned as a building block to provide the economic foundation, technology advancements and operational infrastructure to support others that follow. This report presents fundamental issues and requirements associated with planning human Mars initiatives that can transfer crews, habitats and equipment from Earth to Mars orbit, deliver them to the planet's surface, and return people and samples safely back to Earth. The study builds in part upon previous studies which are summarized in SICSA's: Commercial Space Development Plan and the Artificial Gravity Science and Excursion Vehicle reports. Information and conclusions produced in this study provide assumptions and a conceptual foundation for a subsequent report titled The First Mars Outpost: Planning and Concepts. c2005 Elsevier Ltd. All rights reserved.
Heavy Equipment Operator: General Equipment Operator. Instructional Materials.
ERIC Educational Resources Information Center
Hendrix, Laborn J.; Sawatzky, Joyce
Developed through close coordination between contractors, construction workers, and vocational educators, this instructor's manual is designed to help heavy equipment instructors present materials in a systematic format. The instructional materials in the manual are written in terms of student performance, using measurable behavioral objectives.…
Comparison of ablation centration after bilateral sequential versus simultaneous LASIK.
Lin, Jane-Ming; Tsai, Yi-Yu
2005-01-01
To compare ablation centration after bilateral sequential and simultaneous myopic LASIK. A retrospective randomized case series was performed of 670 eyes of 335 consecutive patients who had undergone either bilateral sequential (group 1) or simultaneous (group 2) myopic LASIK between July 2000 and July 2001 at the China Medical University Hospital, Taichung, Taiwan. The ablation centrations of the first and second eyes in the two groups were compared 3 months postoperatively. Of 670 eyes, 274 eyes (137 patients) comprised the sequential group and 396 eyes (198 patients) comprised the simultaneous group. Three months post-operatively, 220 eyes of 110 patients (80%) in the sequential group and 236 eyes of 118 patients (60%) in the simultaneous group provided topographic data for centration analysis. For the first eyes, mean decentration was 0.39 +/- 0.26 mm in the sequential group and 0.41 +/- 0.19 mm in the simultaneous group (P = .30). For the second eyes, mean decentration was 0.28 +/- 0.23 mm in the sequential group and 0.30 +/- 0.21 mm in the simultaneous group (P = .36). Decentration in the second eyes significantly improved in both groups (group 1, P = .02; group 2, P < .01). The mean distance between the first and second eyes was 0.31 +/- 0.25 mm in the sequential group and 0.32 +/- 0.18 mm in the simultaneous group (P = .33). The difference of ablation center angles between the first and second eyes was 43.2 < or = 48.3 degrees in the sequential group and 45.1 +/- 50.8 degrees in the simultaneous group (P = .42). Simultaneous bilateral LASIK is comparable to sequential surgery in ablation centration.
46 CFR 97.90-1 - Pilot boarding operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Pilot boarding operation. 97.90-1 Section 97.90-1... OPERATIONS Pilot Boarding Operations § 97.90-1 Pilot boarding operation. (a) The master shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment must be kept clean and in good...
46 CFR 97.90-1 - Pilot boarding operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding operation. 97.90-1 Section 97.90-1... OPERATIONS Pilot Boarding Operations § 97.90-1 Pilot boarding operation. (a) The master shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment must be kept clean and in good...
Power-Aware Compiler Controllable Chip Multiprocessor
NASA Astrophysics Data System (ADS)
Shikano, Hiroaki; Shirako, Jun; Wada, Yasutaka; Kimura, Keiji; Kasahara, Hironori
A power-aware compiler controllable chip multiprocessor (CMP) is presented and its performance and power consumption are evaluated with the optimally scheduled advanced multiprocessor (OSCAR) parallelizing compiler. The CMP is equipped with power control registers that change clock frequency and power supply voltage to functional units including processor cores, memories, and an interconnection network. The OSCAR compiler carries out coarse-grain task parallelization of programs and reduces power consumption using architectural power control support and the compiler's power saving scheme. The performance evaluation shows that MPEG-2 encoding on the proposed CMP with four CPUs results in 82.6% power reduction in real-time execution mode with a deadline constraint on its sequential execution time. Furthermore, MP3 encoding on a heterogeneous CMP with four CPUs and four accelerators results in 53.9% power reduction at 21.1-fold speed-up in performance against its sequential execution in the fastest execution mode.
Visual feedback system to reduce errors while operating roof bolting machines
Steiner, Lisa J.; Burgess-Limerick, Robin; Eiter, Brianna; Porter, William; Matty, Tim
2015-01-01
Problem Operators of roof bolting machines in underground coal mines do so in confined spaces and in very close proximity to the moving equipment. Errors in the operation of these machines can have serious consequences, and the design of the equipment interface has a critical role in reducing the probability of such errors. Methods An experiment was conducted to explore coding and directional compatibility on actual roof bolting equipment and to determine the feasibility of a visual feedback system to alert operators of critical movements and to also alert other workers in close proximity to the equipment to the pending movement of the machine. The quantitative results of the study confirmed the potential for both selection errors and direction errors to be made, particularly during training. Results Subjective data confirmed a potential benefit of providing visual feedback of the intended operations and movements of the equipment. Impact This research may influence the design of these and other similar control systems to provide evidence for the use of warning systems to improve operator situational awareness. PMID:23398703
Improving the Reliability of Technological Subsystems Equipment for Steam Turbine Unit in Operation
NASA Astrophysics Data System (ADS)
Brodov, Yu. M.; Murmansky, B. E.; Aronson, R. T.
2017-11-01
The authors’ conception is presented of an integrated approach to reliability improving of the steam turbine unit (STU) state along with its implementation examples for the various STU technological subsystems. Basing on the statistical analysis of damage to turbine individual parts and components, on the development and application of modern methods and technologies of repair and on operational monitoring techniques, the critical components and elements of equipment are identified and priorities are proposed for improving the reliability of STU equipment in operation. The research results are presented of the analysis of malfunctions for various STU technological subsystems equipment operating as part of power units and at cross-linked thermal power plants and resulting in turbine unit shutdown (failure). Proposals are formulated and justified for adjustment of maintenance and repair for turbine components and parts, for condenser unit equipment, for regeneration subsystem and oil supply system that permit to increase the operational reliability, to reduce the cost of STU maintenance and repair and to optimize the timing and amount of repairs.
14 CFR 23.1415 - Ditching equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Ditching equipment. (a) Emergency flotation and signaling equipment required by any operating rule in this... each life preserver must be approved. (c) Each raft released automatically or by the pilot must be... any operating rule in this chapter, must be accessible, function satisfactorily, and must be free of...
40 CFR 265.401 - General operating requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... equipment, the process or equipment must be equipped with a means to stop this inflow (e.g., a waste feed....401 Section 265.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...
33 CFR 169.245 - What must a ship master do if LRIT equipment is switched off or fails to operate?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false What must a ship master do if... master do if LRIT equipment is switched off or fails to operate? (a) If a ship's LRIT equipment is switched off or fails to operate, the ship's master must inform his or her Flag Administration without...
A life sciences Spacelab mission simulation
NASA Technical Reports Server (NTRS)
Mason, J. A.; Musgrave, F. S.; Morrison, D. R.
1977-01-01
The paper describes the purposes of a seven-day simulated life-sciences mission conducted in a Spacelab simulator. A major objective was the evaluation of in-orbit Spacelab operations and those mission control support functions which will be required from the Payload Operations Center. Tested equipment and procedures included experiment racks, common operational research equipment, commercial off-the-shelf equipment, experiment hardware interfaces with Spacelab, experiment data handling concepts, and Spacelab trash management.
Wald Sequential Probability Ratio Test for Space Object Conjunction Assessment
NASA Technical Reports Server (NTRS)
Carpenter, James R.; Markley, F Landis
2014-01-01
This paper shows how satellite owner/operators may use sequential estimates of collision probability, along with a prior assessment of the base risk of collision, in a compound hypothesis ratio test to inform decisions concerning collision risk mitigation maneuvers. The compound hypothesis test reduces to a simple probability ratio test, which appears to be a novel result. The test satisfies tolerances related to targeted false alarm and missed detection rates. This result is independent of the method one uses to compute the probability density that one integrates to compute collision probability. A well-established test case from the literature shows that this test yields acceptable results within the constraints of a typical operational conjunction assessment decision timeline. Another example illustrates the use of the test in a practical conjunction assessment scenario based on operations of the International Space Station.
Probing finite coarse-grained virtual Feynman histories with sequential weak values
NASA Astrophysics Data System (ADS)
Georgiev, Danko; Cohen, Eliahu
2018-05-01
Feynman's sum-over-histories formulation of quantum mechanics has been considered a useful calculational tool in which virtual Feynman histories entering into a coherent quantum superposition cannot be individually measured. Here we show that sequential weak values, inferred by consecutive weak measurements of projectors, allow direct experimental probing of individual virtual Feynman histories, thereby revealing the exact nature of quantum interference of coherently superposed histories. Because the total sum of sequential weak values of multitime projection operators for a complete set of orthogonal quantum histories is unity, complete sets of weak values could be interpreted in agreement with the standard quantum mechanical picture. We also elucidate the relationship between sequential weak values of quantum histories with different coarse graining in time and establish the incompatibility of weak values for nonorthogonal quantum histories in history Hilbert space. Bridging theory and experiment, the presented results may enhance our understanding of both weak values and quantum histories.
36 CFR 1281.3 - What definitions apply to this part?
Code of Federal Regulations, 2010 CFR
2010-07-01
... part, the term means operating equipment that must be furnished with the new library and included in the calculation of the required endowment. Operating equipment is fundamental to the operation of the...) and established as part of the system of Presidential libraries managed by NARA. Facility operations...
48 CFR 52.247-25 - Government-Furnished Equipment With or Without Operators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... transportation or for transportation-related services when the Government furnishes equipment with or without... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Government-Furnished... Text of Provisions and Clauses 52.247-25 Government-Furnished Equipment With or Without Operators. As...
48 CFR 52.247-25 - Government-Furnished Equipment With or Without Operators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... transportation or for transportation-related services when the Government furnishes equipment with or without... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Government-Furnished... Text of Provisions and Clauses 52.247-25 Government-Furnished Equipment With or Without Operators. As...
48 CFR 246.270 - Safety of facilities, infrastructure, and equipment for military operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ASSURANCE Contract Quality Requirements 246.270 Safety of facilities, infrastructure, and equipment for... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Safety of facilities, infrastructure, and equipment for military operations. 246.270 Section 246.270 Federal Acquisition Regulations...
18 CFR 367.3960 - Account 396, Power operated equipment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...
18 CFR 367.3960 - Account 396, Power operated equipment.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...
18 CFR 367.3960 - Account 396, Power operated equipment.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...
18 CFR 367.3960 - Account 396, Power operated equipment.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Account 396, Power operated equipment. 367.3960 Section 367.3960 Conservation of Power and Water Resources FEDERAL ENERGY... work exclusive of equipment includible in other accounts. Include, also, the tools and accessories...
38 CFR 39.50 - Amount of grant.
Code of Federal Regulations, 2014 CFR
2014-07-01
... an establishment grant, the cost of equipment necessary for the operation of the State or Tribal... equipment necessary for operation of the State or Tribal veterans cemetery, but only if such equipment: (i... fuel and fertilizer) that are routinely used in a cemetery; or (6) Fully enclosed, climate-controlled...
38 CFR 39.50 - Amount of grant.
Code of Federal Regulations, 2013 CFR
2013-07-01
... an establishment grant, the cost of equipment necessary for the operation of the State or Tribal... equipment necessary for operation of the State or Tribal veterans cemetery, but only if such equipment: (i... fuel and fertilizer) that are routinely used in a cemetery; or (6) Fully enclosed, climate-controlled...
38 CFR 39.50 - Amount of grant.
Code of Federal Regulations, 2012 CFR
2012-07-01
... an establishment grant, the cost of equipment necessary for the operation of the State or Tribal... equipment necessary for operation of the State or Tribal veterans cemetery, but only if such equipment: (i... fuel and fertilizer) that are routinely used in a cemetery; or (6) Fully enclosed, climate-controlled...
14 CFR 99.13 - Transponder-on requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...
14 CFR 99.13 - Transponder-on requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...
30 CFR 250.1913 - What criteria for operating procedures must my SEMS program meet?
Code of Federal Regulations, 2011 CFR
2011-07-01
... precautions must include control technology, personal protective equipment, and measures to be taken if...) Bypassing and flagging out-of-service equipment; (7) Safety and environmental consequences of deviating from your equipment operating limits and steps required to correct or avoid this deviation; (8) Properties...
14 CFR 99.13 - Transponder-on requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...
14 CFR 99.13 - Transponder-on requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...
14 CFR 99.13 - Transponder-on requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... equipped with an operable radar beacon transponder, shall operate the transponder, including altitude... designated in subpart B of this part unless that aircraft is equipped with a coded radar beacon transponder..., within, or across the contiguous U.S. ADIZ unless that aircraft is equipped with a coded radar beacon...
Application and Operation of Audiovisual Equipment in Education.
ERIC Educational Resources Information Center
Pula, Fred John
Interest in audiovisual aids in education has been increased by the shortage of classrooms and good teachers and by the modern predisposition toward learning by visual concepts. Effective utilization of audiovisual materials and equipment depends most importantly, on adequate preparation of the teacher in operating equipment and in coordinating…
SEQUENTIAL RADIOCHEMICAL ANALYSIS FOR RUTHENIUM, STRONTIUM AND CESIUM IN ENVIRONMENTAL AIR
In routine surveillance operations, the radionuclide measurement of air discharged from an operating nuclear facility involves the entrainment of radionuclides on selective filter or absorptive media, and the determination of their gross beta activity. However, a more sensitive t...
Shuttle GPS R/PA evaluation analysis and performance tradeoff study
NASA Technical Reports Server (NTRS)
Booth, R. W. D.; Lindsey, W. C.
1978-01-01
Primary responsibility was understanding and analyzing the various GPS receiver functions as they relate to the shuttle environment. These receiver functions included acquisition properties of the sequential detector, acquisition and tracking properties of the various receiver phase locked loops, and the techniques of sequential receiver operation. In addition to these areas, support was provided in the areas of oscillator stability requirements, antenna management, and navigation filter requirements, including preposition aiding.
Expert system for online surveillance of nuclear reactor coolant pumps
Gross, Kenny C.; Singer, Ralph M.; Humenik, Keith E.
1993-01-01
An expert system for online surveillance of nuclear reactor coolant pumps. This system provides a means for early detection of pump or sensor degradation. Degradation is determined through the use of a statistical analysis technique, sequential probability ratio test, applied to information from several sensors which are responsive to differing physical parameters. The results of sequential testing of the data provide the operator with an early warning of possible sensor or pump failure.
THRESHOLD LOGIC SYNTHESIS OF SEQUENTIAL MACHINES.
The application of threshold logic to the design of sequential machines is the subject of this research. A single layer of threshold logic units in...advantages of fewer components because of the use of threshold logic, along with very high-speed operation resulting from the use of only a single layer of...logic. In some instances, namely for asynchronous machines, the only delay need be the natural delay of the single layer of threshold elements. It is
40 CFR 60.634 - Alternative means of emission limitation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... any design, equipment, work practice or operational standard, the Administrator will publish, in the... the design, equipment, work practice or operational standard. ... applications under this section from either owners or operators of affected facilities, or manufacturers of...
Satellite services system analysis study. Volume 5: Programmatics
NASA Technical Reports Server (NTRS)
1981-01-01
The overall program and resources needed for development and operation of a Satellite Services System is reviewed. Program requirements covered system operations through 1993 and were completed in preliminary form. Program requirements were refined based on equipment preliminary design and analysis. Schedules, costs, equipment utilization, and facility/advanced technology requirements were included in the update. Equipment user charges were developed for each piece of equipment and for representative satellite servicing missions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.2944 Section 60.2944 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator...
Safeguarding a Lunar Rover with Wald's Sequential Probability Ratio Test
NASA Technical Reports Server (NTRS)
Furlong, Michael; Dille, Michael; Wong, Uland; Nefian, Ara
2016-01-01
The virtual bumper is a safeguarding mechanism for autonomous and remotely operated robots. In this paper we take a new approach to the virtual bumper system by using an old statistical test. By using a modified version of Wald's sequential probability ratio test we demonstrate that we can reduce the number of false positive reported by the virtual bumper, thereby saving valuable mission time. We use the concept of sequential probability ratio to control vehicle speed in the presence of possible obstacles in order to increase certainty about whether or not obstacles are present. Our new algorithm reduces the chances of collision by approximately 98 relative to traditional virtual bumper safeguarding without speed control.
Advance of Hazardous Operation Robot and its Application in Special Equipment Accident Rescue
NASA Astrophysics Data System (ADS)
Zeng, Qin-Da; Zhou, Wei; Zheng, Geng-Feng
A survey of hazardous operation robot is given out in this article. Firstly, the latest researches such as nuclear industry robot, fire-fighting robot and explosive-handling robot are shown. Secondly, existing key technologies and their shortcomings are summarized, including moving mechanism, control system, perceptive technology and power technology. Thirdly, the trend of hazardous operation robot is predicted according to current situation. Finally, characteristics and hazards of special equipment accident, as well as feasibility of hazardous operation robot in the area of special equipment accident rescue are analyzed.
Multigrid methods in structural mechanics
NASA Technical Reports Server (NTRS)
Raju, I. S.; Bigelow, C. A.; Taasan, S.; Hussaini, M. Y.
1986-01-01
Although the application of multigrid methods to the equations of elasticity has been suggested, few such applications have been reported in the literature. In the present work, multigrid techniques are applied to the finite element analysis of a simply supported Bernoulli-Euler beam, and various aspects of the multigrid algorithm are studied and explained in detail. In this study, six grid levels were used to model half the beam. With linear prolongation and sequential ordering, the multigrid algorithm yielded results which were of machine accuracy with work equivalent to 200 standard Gauss-Seidel iterations on the fine grid. Also with linear prolongation and sequential ordering, the V(1,n) cycle with n greater than 2 yielded better convergence rates than the V(n,1) cycle. The restriction and prolongation operators were derived based on energy principles. Conserving energy during the inter-grid transfers required that the prolongation operator be the transpose of the restriction operator, and led to improved convergence rates. With energy-conserving prolongation and sequential ordering, the multigrid algorithm yielded results of machine accuracy with a work equivalent to 45 Gauss-Seidel iterations on the fine grid. The red-black ordering of relaxations yielded solutions of machine accuracy in a single V(1,1) cycle, which required work equivalent to about 4 iterations on the finest grid level.
Yu, Yinan; Diamantaras, Konstantinos I; McKelvey, Tomas; Kung, Sun-Yuan
2018-02-01
In kernel-based classification models, given limited computational power and storage capacity, operations over the full kernel matrix becomes prohibitive. In this paper, we propose a new supervised learning framework using kernel models for sequential data processing. The framework is based on two components that both aim at enhancing the classification capability with a subset selection scheme. The first part is a subspace projection technique in the reproducing kernel Hilbert space using a CLAss-specific Subspace Kernel representation for kernel approximation. In the second part, we propose a novel structural risk minimization algorithm called the adaptive margin slack minimization to iteratively improve the classification accuracy by an adaptive data selection. We motivate each part separately, and then integrate them into learning frameworks for large scale data. We propose two such frameworks: the memory efficient sequential processing for sequential data processing and the parallelized sequential processing for distributed computing with sequential data acquisition. We test our methods on several benchmark data sets and compared with the state-of-the-art techniques to verify the validity of the proposed techniques.
Tools and Equipment Modeling for Automobile Interactive Assembling Operating Simulation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu Dianliang; Zhu Hongmin; Shanghai Key Laboratory of Advance Manufacturing Environment
Tools and equipment play an important role in the simulation of virtual assembly, especially in the assembly process simulation and plan. Because of variety in function and complexity in structure and manipulation, the simulation of tools and equipments remains to be a challenge for interactive assembly operation. Based on analysis of details and characteristics of interactive operations for automobile assembly, the functional requirement for tools and equipments of automobile assembly is given. Then, a unified modeling method for information expression and function realization of general tools and equipments is represented, and the handling methods of manual, semi-automatic, automatic tools andmore » equipments are discussed. Finally, the application in assembly simulation of rear suspension and front suspension of Roewe 750 automobile is given. The result shows that the modeling and handling methods are applicable in the interactive simulation of various tools and equipments, and can also be used for supporting assembly process planning in virtual environment.« less
Operating environmental laboratories--an overview of analysis equipment procurement and management.
Pandya, G H; Shinde, V M; Kanade, G S; Kondawar, V K
2003-10-01
Management of equipment in an environmental laboratory requires planning involving assessment of the workload on a particular equipment, establishment of criteria and specification for the purchase of equipment, creation of infrastructure for installation and testing of the equipment, optimization of analysis conditions, development of preventive maintenance procedures and establishment of in-house repair facilities. The paper reports the results of such an analysis carried for operating environmental laboratories associated with R& D work, serving as an Govt. laboratory or attached to an Industry for analysing industrial emissions.
30 CFR 250.514 - Well-control fluids, equipment, and operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... equivalent well-control fluid volume shall be calculated and posted near the operator's station. A mechanical... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Well-control fluids, equipment, and operations... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion...
30 CFR 250.408 - May I use alternative procedures or equipment during drilling operations?
Code of Federal Regulations, 2010 CFR
2010-07-01
... during drilling operations? 250.408 Section 250.408 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations General Requirements § 250.408 May I use alternative procedures or equipment...
Highway Maintenance Equipment Operator: Basic Core. Training Materials.
ERIC Educational Resources Information Center
Perky, Sandra Dutreau; And Others
This basic core curriculum is part of a three-part series of instructional guides designed for use in teaching a course in highway maintenance equipment operation. Addressed in the individual units of the curriculum, after an orientation unit, are safety; basic math; basic hand tools; procedures for loading. lashing, and unloading equipment;…
30 CFR 250.457 - What equipment is required to monitor drilling fluids?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor drilling fluids? Once you... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What equipment is required to monitor drilling...
30 CFR 250.457 - What equipment is required to monitor drilling fluids?
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What equipment is required to monitor drilling...
30 CFR 250.457 - What equipment is required to monitor drilling fluids?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What equipment is required to monitor drilling..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor...
30 CFR 250.457 - What equipment is required to monitor drilling fluids?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What equipment is required to monitor drilling..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor...
30 CFR 250.457 - What equipment is required to monitor drilling fluids?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What equipment is required to monitor drilling..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Drilling Fluid Requirements § 250.457 What equipment is required to monitor...
30 CFR 250.1626 - Tubing and wellhead equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Tubing and wellhead equipment. 250.1626 Section... GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Sulphur Operations § 250.1626 Tubing and wellhead equipment. (a) No tubing string shall be placed into service or continue to be used unless such...
Recommendations For The Safe Design, Operation And Use Of Commercial Sun Tanning Equipment
NASA Astrophysics Data System (ADS)
Cox, E. A.
1982-02-01
HSE Guidance Notes are being prepared to give recommendations to the designers, manufacturers, operators and users of commercial sun tanning equipment on the various health and safety aspects associated with the safe construction, siting and use of such equipment. Medically prescribed ultraviolet treatments are excluded from the guidance.
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
30 CFR 56.14200 - Warnings prior to starting or moving equipment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Warnings prior to starting or moving equipment... MINES Machinery and Equipment Safety Practices and Operational Procedures § 56.14200 Warnings prior to... operators shall sound a warning that is audible above the surrounding noise level or use other effective...
47 CFR 15.507 - Marketing of UWB equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...
47 CFR 15.507 - Marketing of UWB equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...
47 CFR 15.507 - Marketing of UWB equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 1 2013-10-01 2013-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...
47 CFR 15.507 - Marketing of UWB equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...
47 CFR 15.507 - Marketing of UWB equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 1 2012-10-01 2012-10-01 false Marketing of UWB equipment. 15.507 Section 15... Operation § 15.507 Marketing of UWB equipment. In some cases, the operation of UWB devices is limited to... state or local government. The marketing of UWB devices must be directed solely to parties eligible to...
An on-line monitoring system for navigation equipment
NASA Astrophysics Data System (ADS)
Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei
2017-10-01
Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.
Ziylan-Yavas, Asu; Ince, Nilsun H
2018-01-01
The study is about the assessment of single and multi-frequency operations for the overall degradation of a widely consumed analgesic pharmaceutical-ibuprofen (IBP). The selected frequencies were in the range of 20-1130kHz emissions coming from probes, baths and piezo-electric transducers attached to plate-type devices. Multi-frequency operations were applied either simultaneously as "duals", or sequentially at fixed time intervals; and the total reaction time in all operations was 30-min. The work also covers evaluation of the effect of zero-valent iron (ZVI) on the efficiency of the degradation process and the performance of the reaction systems. It was found that low-frequency probe type devices especially at 20kHz were ineffective when applied singly and without ZVI, and relatively more effective in combined-frequency operations in the presence of ZVI. The power efficiencies of the reactors and/or reaction systems showed that 20-kHz probe was considerably more energy intensive than all others, and was therefore not used in multi-frequency operations. The most efficient reactor in terms of power consumption was the bath (200kHz), which however provided insufficient mineralization of the test chemical. The highest percentage of TOC decay (37%) was obtained in a dual-frequency operation (40/572kHz) with ZVI, in which the energy consumption was neither low nor exceptionally too high. A sequential operation (40+200kHz) in that respect was more efficient, because it required much less energy for a similar TOC decay performance (30%). In general, the degradation of IBP increased with increased power consumption, which in turn reduced the sonochemical yield. The study also showed that advanced Fenton reactions with ZVI were faster in the presence of ultrasound, and the metal was very effective in improving the performance of low-frequency operations. Copyright © 2017 Elsevier B.V. All rights reserved.
Islet organogenesis, angiogenesis and innervation.
Cerf, Marlon E
2011-11-01
The pancreas is characterized by a major component, an exocrine and ductal system involved in digestion, and a minor component, the endocrine islets represented by islet micro-organs that tightly regulate glucose homoeostasis. Pancreatic organogenesis is strictly co-ordinated by transcription factors that are expressed sequentially to yield functional islets capable of maintaining glucose homoeostasis. Angiogenesis and innervation complete islet development, equipping islets to respond to metabolic demands. Proper regulation of this triad of processes during development is critical for establishing functional islets.
Digital stereoscopic cinema: the 21st century
NASA Astrophysics Data System (ADS)
Lipton, Lenny
2008-02-01
Over 1000 theaters in more than a dozen countries have been outfitted with digital projectors using the Texas Instruments DLP engine equipped to show field-sequential 3-D movies using the polarized method of image selection. Shuttering eyewear and advanced anaglyph products are also being deployed for image selection. Many studios are in production with stereoscopic films, and some have committed to producing their entire output of animated features in 3-D. This is a time of technology change for the motion picture industry.
Blinks, saccades, and fixation pauses during vigilance task performance. I., Time on task.
DOT National Transportation Integrated Search
1994-12-01
In the future, operators of complex equipment will spend more time monitoring computer controlled devices rather than having hands on control of such equipment. The operator intervenes in system operation under "unusual" conditions or when there is a...
77 FR 26356 - Petition for Waiver of Compliance
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-03
... Order Procedures: Railroad Track, Locomotive and Equipment; 217, Railroad Operating Rules; 218, Railroad Operating Practices; 229, Railroad Locomotive Safety Standards; 233, Signal Systems Reporting Requirements... requiring special notice for repairs. Waiver is also sought for non-I-ETMS-equipped locomotives operating in...
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
40 CFR 63.9565 - What definitions apply to this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...
30 CFR 57.14103 - Operators' stations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Equipment Safety Devices and Maintenance Requirements § 57.14103 Operators' stations. (a) If windows are provided on operators' stations of self-propelled mobile equipment, the windows shall be made of safety glass or material with equivalent safety characteristics. The windows shall be maintained to provide...
Code of Federal Regulations, 2010 CFR
2010-04-01
... School Operation and Maintenance Fund § 39.1200 Definitions. Contract school operation and maintenance costs for fiscal year 1979 means the sum of costs for custodial salaries and fringe benefits, related supplies and equipment and equipment repair, insurance, and school operation utilities costs, where such...
The automatic control system and stand-by facilities of the TDMA-40 equipment
NASA Astrophysics Data System (ADS)
Gudenko, D. V.; Pankov, G. Kh.; Pauk, A. G.; Tsirlin, V. M.
1980-10-01
When a controlling station in a satellite communications system is out of order, a complex algorithm must be carried out for automatic operation of the stand-by equipment. A processor has been developed to perform this algorithm, as well as operations involving the stand-by facilities of the receiving-transmitting equipment of the station. The design principles and solutions to problems in developing the equipment for the monitoring and controlling systems are described. These systems are based on multistation access using time division multiplexing. Algorithms are presented for the operation of the synchronizing processor and the control processor of the equipment. The automatic control system and stand-by facilities make it possible to reduce the service personnel and to design an unattended station.
Li, Ke; Ping, Xueliang; Wang, Huaqing; Chen, Peng; Cao, Yi
2013-06-21
A novel intelligent fault diagnosis method for motor roller bearings which operate under unsteady rotating speed and load is proposed in this paper. The pseudo Wigner-Ville distribution (PWVD) and the relative crossing information (RCI) methods are used for extracting the feature spectra from the non-stationary vibration signal measured for condition diagnosis. The RCI is used to automatically extract the feature spectrum from the time-frequency distribution of the vibration signal. The extracted feature spectrum is instantaneous, and not correlated with the rotation speed and load. By using the ant colony optimization (ACO) clustering algorithm, the synthesizing symptom parameters (SSP) for condition diagnosis are obtained. The experimental results shows that the diagnostic sensitivity of the SSP is higher than original symptom parameter (SP), and the SSP can sensitively reflect the characteristics of the feature spectrum for precise condition diagnosis. Finally, a fuzzy diagnosis method based on sequential inference and possibility theory is also proposed, by which the conditions of the machine can be identified sequentially as well.
Sequential and ordered assembly of a large DNA repair complex on undamaged chromatin
Ziani, Salim; Nagy, Zita; Alekseev, Sergey; Soutoglou, Evi; Egly, Jean-Marc
2014-01-01
In nucleotide excision repair (NER), damage recognition by XPC-hHR23b is described as a critical step in the formation of the preincision complex (PInC) further composed of TFIIH, XPA, RPA, XPG, and ERCC1-XPF. To obtain new molecular insights into the assembly of the PInC, we analyzed its formation independently of DNA damage by using the lactose operator/repressor reporter system. We observed a sequential and ordered self-assembly of the PInC operating upon immobilization of individual NER factors on undamaged chromatin and mimicking that functioning on a bona fide NER substrate. We also revealed that the recruitment of the TFIIH subunit TTDA, involved in trichothiodystrophy group A disorder (TTD-A), was key in the completion of the PInC. TTDA recruits XPA through its first 15 amino acids, depleted in some TTD-A patients. More generally, these results show that proteins forming large nuclear complexes can be recruited sequentially on chromatin in the absence of their natural DNA target and with no reciprocity in their recruitment. PMID:25154395
Li, Ke; Ping, Xueliang; Wang, Huaqing; Chen, Peng; Cao, Yi
2013-01-01
A novel intelligent fault diagnosis method for motor roller bearings which operate under unsteady rotating speed and load is proposed in this paper. The pseudo Wigner-Ville distribution (PWVD) and the relative crossing information (RCI) methods are used for extracting the feature spectra from the non-stationary vibration signal measured for condition diagnosis. The RCI is used to automatically extract the feature spectrum from the time-frequency distribution of the vibration signal. The extracted feature spectrum is instantaneous, and not correlated with the rotation speed and load. By using the ant colony optimization (ACO) clustering algorithm, the synthesizing symptom parameters (SSP) for condition diagnosis are obtained. The experimental results shows that the diagnostic sensitivity of the SSP is higher than original symptom parameter (SP), and the SSP can sensitively reflect the characteristics of the feature spectrum for precise condition diagnosis. Finally, a fuzzy diagnosis method based on sequential inference and possibility theory is also proposed, by which the conditions of the machine can be identified sequentially as well. PMID:23793021
Development of an Infrared Remote Sensing System for Continuous Monitoring of Stromboli Volcano
NASA Astrophysics Data System (ADS)
Harig, R.; Burton, M.; Rausch, P.; Jordan, M.; Gorgas, J.; Gerhard, J.
2009-04-01
In order to monitor gases emitted by Stromboli volcano in the Eolian archipelago, Italy, a remote sensing system based on Fourier-transform infrared spectroscopy has been developed and installed on the summit of Stromboli volcano. Hot rocks and lava are used as sources of infrared radiation. The system is based on an interferometer with a single detector element in combination with an azimuth-elevation scanning mirror system. The mirror system is used to align the field of view of the instrument. In addition, the system is equipped with an infrared camera. Two basic modes of operation have been implemented: The user may use the infrared image to align the system to a vent that is to be examined. In addition, the scanning system may be used for (hyperspectral) imaging of the scene. In this mode, the scanning mirror is set sequentially move to all positions within a region of interest which is defined by the operator using the image generated from the infrared camera. The spectral range used for the measurements is 1600 - 4200 cm-1 allowing the quantification of many gases such as CO, CO2, SO2, and HCl. The spectral resolution is 0.5 cm-1. In order to protect the optical, mechanical and electrical parts of the system from the volcanic gases, all components are contained in a gas-tight aluminium housing. The system is controlled via TCP/IP (data transfer by WLAN), allowing the user to operate it from a remote PC. The infrared image of the scene and measured spectra are transferred to and displayed by a remote PC at INGV or TUHH in real-time. However, the system is capable of autonomous operation on the volcano, once a measurement has been started. Measurements are stored by an internal embedded PC.
46 CFR 153.484 - Prewash equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...
46 CFR 153.484 - Prewash equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...
46 CFR 153.484 - Prewash equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...
46 CFR 153.484 - Prewash equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...
46 CFR 153.484 - Prewash equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.484 Prewash equipment. Unless the ship operator shows that the prewash...
Poster - Thur Eve - 02: Regulatory oversight of the robotic radiosurgery facilities.
Broda, K
2012-07-01
Following a recent review of the Class II Nuclear Facilities and Prescribed Equipment Regulations and regulatory oversight of particle accelerators, the Canadian Nuclear Safety Commission (CNSC) has changed its policy concerning the regulation of particle accelerators. In November 2011, the CNSC began to exercise its regulatory authority with respect to all particle accelerators operating at a beam energy of 1 (one) MeV or greater. The CNSC already licences and inspects particle accelerators capable of operating at or above 10 MeV. The decision to now include low energy particle accelerators (i.e., those operating at or above 1 MeV) ensures adequate, uniform and consistent regulatory oversight for all Class II accelerators. The CNSC expects these facilities to comply with CNSC requirements by December 2013. Besides conventional linear accelerators of lower energy (6 MeV or below) typically found in cancer clinics, two types of equipment now fall under the CNSC's regulatory oversight as a result of the above change: robotic radiosurgery and tomotherapy equipment and facilities. A number of clinics in Canada already operates these types of equipment and facilities. The safety aspects of radiosurgery equipment differ slightly from those for conventional linear accelerators. This poster aims to present an approach taken by the CNSC to regulate robotic radiosurgery equipment and facilities. The presentation will explain how to meet regulatory requirements of the Class II Nuclear Facilities and Prescribed Equipment Regulations by licensees operating or planning to acquire these types of equipment and facilities. © 2012 American Association of Physicists in Medicine.
46 CFR 108.655 - Operating instructions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...
46 CFR 108.655 - Operating instructions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...
46 CFR 108.655 - Operating instructions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...
46 CFR 108.655 - Operating instructions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...
46 CFR 108.655 - Operating instructions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Operating instructions. 108.655 Section 108.655 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Equipment Markings and Instructions § 108.655 Operating instructions. Each unit must have posters...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
Video systems for real-time oil-spill detection
NASA Technical Reports Server (NTRS)
Millard, J. P.; Arvesen, J. C.; Lewis, P. L.; Woolever, G. F.
1973-01-01
Three airborne television systems are being developed to evaluate techniques for oil-spill surveillance. These include a conventional TV camera, two cameras operating in a subtractive mode, and a field-sequential camera. False-color enhancement and wavelength and polarization filtering are also employed. The first of a series of flight tests indicates that an appropriately filtered conventional TV camera is a relatively inexpensive method of improving contrast between oil and water. False-color enhancement improves the contrast, but the problem caused by sun glint now limits the application to overcast days. Future effort will be aimed toward a one-camera system. Solving the sun-glint problem and developing the field-sequential camera into an operable system offers potential for color 'flagging' oil on water.
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2013 CFR
2013-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
7 CFR 550.35 - Rules of the workplace.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the REE Agency's facilities, will abide by the Agency's standard operating procedures regarding the maintenance of laboratory notebooks, dissemination of information, equipment operation standards, hours of.... Equipment/Property Standards ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.3043 Section 60.3043 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission...
Pickersgill, C H; Marr, C M; Reid, S W
2001-01-01
A quantitative investigation of the variation that can occur during the course of ultrasonography of the equine superficial digital flexor tendons (SDFT) was undertaken. The aim of this investigation was to use an objective measure, namely the measurement of CSA, to quantify the variability occurring during the course of the ultrasonographic assessment of the equine SDFT. The effects of 3 variables on the CSA measurements were determined. 1) Image acquisition operator (IAc): two different operators undertaking the ultrasonographic examination; 2) image analysis operator (IAn): two different operators undertaking the calculation of CSA values from previously stored images; and 3) analytical equipment (used during CSA measurement) (IEq): the use of 2 different sets of equipment during calculation of CSA values. Tendon cross-sectional area (CSA) measurements were used as the comparative variable of 3 potential sources: interoperator, during image acquisition; interoperator, during CSA measurement; and intraoperator, when using different analytical equipment. Two operators obtained transverse ultrasonographic images from the forelimb SDFTs of 16 National Hunt (NH) Thoroughbred (TB) racehorses, each undertaking analysis of their own and the other operator's images. One operator undertook analysis of their images using 2 sets of equipment. There was no statistically significant difference in the results obtained when different operators undertook image acquisition (P>0.05). At all but the most distal level, there was no significant difference when different equipment was used during analysis (P>0.05). A significant difference (P<0.01) was reported when different operators undertook image analysis, one operator consistently returning larger measurements. Different operators undertaking different stages of an examination can result in significant variability. To reduce confounding during ultrasonographic investigations involving multiple persons, one operator should undertake image analysis, although different operators may undertake image acquisition.
2009-09-01
though other variants can also deploy and operate from an aircraft carrier as well. While the SH-60B is equipped with a towed Magnetic Anomaly...for the scope of this thesis, the JMMES system utilized was not equipped with a MAD sensor and the operator workstation was onboard the aircraft ...investigates how a JMMES equipped SH-60 variant aircraft affects U.S. ISR capabilities in the littoral regions, specifically in the areas of Anti
S Chapman, Jocelyn; Roddy, Erika; Panighetti, Anna; Hwang, Shelley; Crawford, Beth; Powell, Bethan; Chen, Lee-May
2016-12-01
Women with breast cancer who carry BRCA1 or BRCA2 mutations must also consider risk-reducing salpingo-oophorectomy (RRSO) and how to coordinate this procedure with their breast surgery. We report the factors associated with coordinated versus sequential surgery and compare the outcomes of each. Patients in our cancer risk database who had breast cancer and a known deleterious BRCA1/2 mutation before undergoing breast surgery were included. Women who chose concurrent RRSO at the time of breast surgery were compared to those who did not. Sixty-two patients knew their mutation carrier status before undergoing breast cancer surgery. Forty-three patients (69%) opted for coordinated surgeries, and 19 (31%) underwent sequential surgeries at a median follow-up of 4.4 years. Women who underwent coordinated surgery were significantly older than those who chose sequential surgery (median age of 45 vs. 39 years; P = .025). There were no differences in comorbidities between groups. Patients who received neoadjuvant chemotherapy were more likely to undergo coordinated surgery (65% vs. 37%; P = .038). Sequential surgery patients had longer hospital stays (4.79 vs. 3.44 days, P = .01) and longer operating times (8.25 vs. 6.38 hours, P = .006) than patients who elected combined surgery. Postoperative complications were minor and were no more likely in either group (odds ratio, 4.76; 95% confidence interval, 0.56-40.6). Coordinating RRSO with breast surgery is associated with receipt of neoadjuvant chemotherapy, longer operating times, and hospital stays without an observed increase in complications. In the absence of risk, surgical options can be personalized. Copyright © 2016 Elsevier Inc. All rights reserved.
18 CFR 367.3980 - Account 398, Miscellaneous equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Cranes and Derricks in Construction § 1926.1417 Operation...) Swinging locomotive cranes. A locomotive crane must not be swung into a position where railway cars on an... applies to equipment other than tower cranes: (i) Equipment must not be operated without the counterweight...
Code of Federal Regulations, 2012 CFR
2012-07-01
... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...
Code of Federal Regulations, 2010 CFR
2010-07-01
... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...
Code of Federal Regulations, 2013 CFR
2013-07-01
... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...
Code of Federal Regulations, 2014 CFR
2014-07-01
... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...
Code of Federal Regulations, 2011 CFR
2011-07-01
... of hazardous waste (e.g., wet spots, dead vegetation). (c) Owners or operators of tank systems that... operating day, data gathered from monitoring and leak detection equipment (e.g., pressure or temperature... must inspect at least once each operating day: (1) Overfill/spill control equipment (e.g., waste-feed...
78 FR 26110 - Kicking Cars and Going Between Rolling Equipment During Flat Switching Operations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... Cars and Going Between Rolling Equipment During Flat Switching Operations AGENCY: Federal Railroad... occurred during a railroad switching operation that involved a railroad employee kicking cars and... make recommendations to railroads regarding the adoption of car-handling procedures during flat...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
33 CFR 149.120 - What are the requirements for manually operated shutoff valves?
Code of Federal Regulations, 2010 CFR
2010-07-01
... manually operated shutoff valves? 149.120 Section 149.120 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT Pollution Prevention Equipment § 149.120 What are the requirements for manually operated shutoff...
Buffer management for sequential decoding. [block erasure probability reduction
NASA Technical Reports Server (NTRS)
Layland, J. W.
1974-01-01
Sequential decoding has been found to be an efficient means of communicating at low undetected error rates from deep space probes, but erasure or computational overflow remains a significant problem. Erasure of a block occurs when the decoder has not finished decoding that block at the time that it must be output. By drawing upon analogies in computer time sharing, this paper develops a buffer-management strategy which reduces the decoder idle time to a negligible level, and therefore improves the erasure probability of a sequential decoder. For a decoder with a speed advantage of ten and a buffer size of ten blocks, operating at an erasure rate of .01, use of this buffer-management strategy reduces the erasure rate to less than .0001.
Wendt, D; Schmidt, D; Wasserfuhr, D; Osswald, B; Thielmann, M; Tossios, P; Kühl, H; Jakob, H; Massoudy, P
2010-09-01
The superiority of left internal thoracic artery (LITA) grafting to the left anterior descending artery (LAD) is well established. Patency rates of 80%-90% have been reported at 10-year follow-up. However, the superiority of sequential LITA grafting has not been proven. Our aim was to compare patency rates after sequential LITA grafting to a diagonal branch and the LAD with patency rates of LITA grafting to the LAD and separate vein grafting to a diagonal branch. A total of 58 coronary artery bypass graft (CABG) patients, operated on between 01/2000 and 12/2002, underwent multi-slice computed tomography (MSCT) between 2006 and 2008. Of these patients, 29 had undergone sequential LITA grafting to a diagonal branch and to the LAD ("Sequential" Group), while in 29 the LAD and a diagonal branch were separately grafted with LITA and vein ("Separate" Group). Patencies of all anastomoses were investigated. Mean follow-up was 1958±208 days. The patency rate of the LAD anastomosis was 100% in the Sequential Group and 93% in the Separate Group (p=0.04). The patency rate of the diagonal branch anastomosis was 100% in the Sequential Group and 89% in the Separate Group (p=0.04). Mean intraoperative flow on LITA graft was not different between groups (69±8ml/min in the Sequential Group and 68±9ml/min in the Separate Group, p=n.s.). Patency rates of both the LAD and the diagonal branch anastomoses were higher after sequential arterial grafting compared with separate arterial and venous grafting at 5-year follow-up. This indicates that, with regard to the antero-lateral wall of the left ventricle, there is an advantage to sequential arterial grafting compared with separate arterial and venous grafting.
LITERATURE REVIEW FOR OXALATE OXIDATION PROCESSES AND PLUTONIUM OXALATE SOLUBILITY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nash, C.
2012-02-03
A literature review of oxalate oxidation processes finds that manganese(II)-catalyzed nitric acid oxidation of oxalate in precipitate filtrate is a viable and well-documented process. The process has been operated on the large scale at Savannah River in the past, including oxidation of 20 tons of oxalic acid in F-Canyon. Research data under a variety of conditions show the process to be robust. This process is recommended for oxalate destruction in H-Canyon in the upcoming program to produce feed for the MOX facility. Prevention of plutonium oxalate precipitation in filtrate can be achieved by concentrated nitric acid/ferric nitrate sequestration of oxalate.more » Organic complexants do not appear practical to sequester plutonium. Testing is proposed to confirm the literature and calculation findings of this review at projected operating conditions for the upcoming campaign. H Canyon plans to commence conversion of plutonium metal to low-fired plutonium oxide in 2012 for eventual use in the Mixed Oxide Fuel (MOX) Facility. The flowsheet includes sequential operations of metal dissolution, ion exchange, elution, oxalate precipitation, filtration, and calcination. All processes beyond dissolution will occur in HB-Line. The filtration step produces an aqueous filtrate that may have as much as 4 M nitric acid and 0.15 M oxalate. The oxalate needs to be removed from the stream to prevent possible downstream precipitation of residual plutonium when the solution is processed in H Canyon. In addition, sending the oxalate to the waste tank farm is undesirable. This report addresses the processing options for destroying the oxalate in existing H Canyon equipment.« less
47 CFR 32.6123 - Office equipment expense.
Code of Federal Regulations, 2010 CFR
2010-10-01
... equipment expense. This account shall be charged only with costs incurred in connection with the office equipment itself. The costs of operators of this equipment shall be charged to accounts appropriate for the...
Radioactive Iodine (I-131) Therapy for Hyperthyroidism
... of your treatment team. top of page What equipment is used? There is no equipment used during ... iodine therapy. top of page Who operates the equipment? There is no equipment used during radioactive iodine ...
Enhancing contrast of fingerprints on plastic tape.
Steele, Charles A; Ball, Mikki S
2003-11-01
Many of the currently available fingerprinting methods have limited ability to visualize fingerprints on plastic tape without expensive equipment or significant handling of the sample. This is especially true for visualizing fingerprints on black electrical tape. This study sought a hands-off method to produce easy visualization of fingerprints on different types of plastic tape, including black electrical tape, without the need for expensive equipment. The methods selected were to sublime disperse dyes into the tape, both with and without the fuming of cyanoacrylate, everywhere except for where the fingerprint was applied. The resulting color contrasts provided enough differentiation to visualize fingerprints on plastic tape under ambient light. Sequential fuming with cyanoacrylate followed by disperse dyes provided the best visualizations on all tapes, and cyanoacrylate followed by disperse yellow 211 clearly visualized fingerprints on black electrical tape.
The proposed coding standard at GSFC
NASA Technical Reports Server (NTRS)
Morakis, J. C.; Helgert, H. J.
1977-01-01
As part of the continuing effort to introduce standardization of spacecraft and ground equipment in satellite systems, NASA's Goddard Space Flight Center and other NASA facilities have supported the development of a set of standards for the use of error control coding in telemetry subsystems. These standards are intended to ensure compatibility between spacecraft and ground encoding equipment, while allowing sufficient flexibility to meet all anticipated mission requirements. The standards which have been developed to date cover the application of block codes in error detection and error correction modes, as well as short and long constraint length convolutional codes decoded via the Viterbi and sequential decoding algorithms, respectively. Included are detailed specifications of the codes, and their implementation. Current effort is directed toward the development of standards covering channels with burst noise characteristics, channels with feedback, and code concatenation.
1991-08-01
insert various jamming signals. The criterion for classifying radio equipment under test is the quality of transferred information , that is the SINAD...UNCLASSFED) This report describes a test facility for measuring the behaviour and quality of radio communication equipment in a simulated operational...formation FEL has the disposal of a facility to test the quality of radio equipment in a simulated operational situation. (Y .. ,. -’ , / " " ’ TNO mppon 4
Estimating Noise Levels In An Enclosed Space
NASA Technical Reports Server (NTRS)
Azzi, Elias
1995-01-01
GEGS Acoustic Analysis Program (GAAP) developed to compute composite profile of noise in Spacelab module on basis of data on noise produced by equipment, data on locations of equipment, and equipment-operating schedules. Impetus for development of GAAP provided by noise that generated in Spacelab Module during SLS-1 mission because of concurrent operation of many pieces of experimental and subsystem equipment. Although originally intended specifically to help compute noise in Spacelab, also applicable to any region with multiple sources of noise. Written in FORTRAN 77.
Random Boolean networks for autoassociative memory: Optimization and sequential learning
NASA Astrophysics Data System (ADS)
Sherrington, D.; Wong, K. Y. M.
Conventional neural networks are based on synaptic storage of information, even when the neural states are discrete and bounded. In general, the set of potential local operations is much greater. Here we discuss some aspects of the properties of networks of binary neurons with more general Boolean functions controlling the local dynamics. Two specific aspects are emphasised; (i) optimization in the presence of noise and (ii) a simple model for short-term memory exhibiting primacy and recency in the recall of sequentially taught patterns.
Grafe, Victor G.; Hoch, James E.
1993-01-01
A sequencing and data fanout mechanism is provided for a dataflow processor is activated by an input token which causes a sequence of operations to occur by initiating a first instruction to act on data contained within the token and then executing a sequential thread of instructions identified by either a repeat count and an offset within the token, or by an offset within each preceding instruction.
A high speed sequential decoder
NASA Technical Reports Server (NTRS)
Lum, H., Jr.
1972-01-01
The performance and theory of operation for the High Speed Hard Decision Sequential Decoder are delineated. The decoder is a forward error correction system which is capable of accepting data from binary-phase-shift-keyed and quadriphase-shift-keyed modems at input data rates up to 30 megabits per second. Test results show that the decoder is capable of maintaining a composite error rate of 0.00001 at an input E sub b/N sub o of 5.6 db. This performance has been obtained with minimum circuit complexity.
Suggested set-up and layout of instruments and equipment for advanced operative laparoscopy.
Winer, W K; Lyons, T L
1995-02-01
Crucial elements that ensure the organization and smoothness of a laparoscopic procedure are clear communication among well-trained endoscopy team members, properly maintained equipment, and a sensible layout of the instruments. The team consists of the surgeon, surgical assistant, circulator, scrub nurse, laser nurse, and anesthesiologist. To promote continuity and interaction and to ensure a systematic, pleasant pace for laparoscopic procedures, the team should establish a specific routine, as well as set-up and layout of tables, equipment, and instruments. Key ingredients for advanced operative laparoscopy to be performed with optimum efficiency and effectiveness are the best organization and placement of the equipment, instrumentation, and team in a particular setting in the operating room.
40 CFR 112.1 - General applicability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the singular also include the plural and words in the masculine gender also include the feminine and... does not apply to: (1) The owner or operator of any facility, equipment, or operation that is not.... (ii) Any equipment, or operation of a vessel or transportation-related onshore or offshore facility...
14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... more in passenger-carrying operations, except a helicopter operating under day VFR conditions, unless..., excluding any pilot seat, of 10 seats or more in passenger-carrying operations, under night VFR when current... approved airborne weather radar equipment. (c) No person may begin a flight under IFR or night VFR...
49 CFR 232.609 - Handling of defective equipment with ECP brake systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... and appropriate operating and inspection personnel; and (3) An electronic or written record of the... operating freight cars equipped with ECP brake systems shall adopt and comply with specific procedures... this subpart. These procedures shall be made available to FRA upon request. (2) Each railroad operating...
46 CFR 76.27-15 - Operation and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...
29 CFR 784.123 - Operations performed on fishing equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 3 2013-07-01 2013-07-01 false Operations performed on fishing equipment. 784.123 Section... LABOR STANDARDS ACT APPLICABLE TO FISHING AND OPERATIONS ON AQUATIC PRODUCTS Exemptions Provisions Relating to Fishing and Aquatic Products General Character and Scope of the Section 13(a)(5) Exemption...
29 CFR 784.123 - Operations performed on fishing equipment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 3 2011-07-01 2011-07-01 false Operations performed on fishing equipment. 784.123 Section... LABOR STANDARDS ACT APPLICABLE TO FISHING AND OPERATIONS ON AQUATIC PRODUCTS Exemptions Provisions Relating to Fishing and Aquatic Products General Character and Scope of the Section 13(a)(5) Exemption...
29 CFR 784.123 - Operations performed on fishing equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 3 2012-07-01 2012-07-01 false Operations performed on fishing equipment. 784.123 Section... LABOR STANDARDS ACT APPLICABLE TO FISHING AND OPERATIONS ON AQUATIC PRODUCTS Exemptions Provisions Relating to Fishing and Aquatic Products General Character and Scope of the Section 13(a)(5) Exemption...
29 CFR 784.123 - Operations performed on fishing equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 3 2014-07-01 2014-07-01 false Operations performed on fishing equipment. 784.123 Section... LABOR STANDARDS ACT APPLICABLE TO FISHING AND OPERATIONS ON AQUATIC PRODUCTS Exemptions Provisions Relating to Fishing and Aquatic Products General Character and Scope of the Section 13(a)(5) Exemption...
DOT National Transportation Integrated Search
1998-07-01
This report is one element of a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). It addresses the operation of a serial string or dense cluster of passenger cars equipped with a new...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation equipment for... § 121.349 Communication and navigation equipment for operations under VFR over routes not navigated by... receiver providing visual and aural signals; and (iii) One ILS receiver; and (3) Any RNAV system used to...
NASA Astrophysics Data System (ADS)
Hsu, Fang-Yuh; Hsu, Shih-Ming; Chao, Jiunn-Hsing
2017-11-01
The subject of this study is the on-site visits and inspections of facilities commissioned by the Atomic Energy Council (AEC) in Taiwan. This research was conducted to evaluate the possible dose and dose rate of cabinet-type X-ray equipment with nominal voltages of 30-150 kV and open-beam (portable or handheld) equipment, taking both normal operation and possibly abnormal operation conditions into account. Doses and dose rates were measured using a plastic scintillation survey meter and an electronic personal dosimeter. In total, 401 X-ray machines were inspected, including 139 units with nominal voltages of 30-50 kV X-ray equipment, 140 units with nominal voltages of 50-150 kV, and 122 open-beam (portable or handheld) X-ray equipment. The investigated doses for radiation workers and non-radiation workers operating cabinet-type X-ray equipment under normal safety conditions were all at the background dose level. Several investigated dose rates at the position of 10 cm away from the surface of open-beam (portable or handheld) X-ray equipment were very high, such X-ray machines are used by aeronautical police for the detection of suspected explosives, radiation workers are far away (at least 10 m away) from the X-ray machine during its operation. The doses per operation in X-ray equipment with a 30-50 kV nominal voltage were less than 1 mSv in all cases of abnormal use. Some doses were higher than 1 mSv per operation for X-ray equipment of 50-150 kV nominal voltage X-ray. The maximum dose rates at the beam exit have a very wide range, mostly less than 100 μSv/s and the largest value is about 3.92 mSv/s for open-beam (portable or handheld) X-ray devices. The risk induced by operating X-ray devices with nominal voltages of 30-50 kV is extremely low. The 11.5 mSv dose due to one operation at nominal voltage of 50-150 kV X-ray device is equivalent to the exposure of taking 575 chest X-rays. In the abnormal use of open-beam (portable or handheld) X-ray equipment, the effective dose of 3.92 mSv/s is equivalent to taking 196 chest radiographs within 1 s. This work assessed the annual doses (equivalent and effective doses) and risks of X-ray operator staff as reasonably as possible. The results of this research are helpful to the AEC (competent authority of ionization radiation) to improve the management and perform the safe control of X-ray equipment.
Sequential Anaerobic/Aerobic Digestion for Enhanced Carbon/Nitrogen Removal and Cake Odor Reduction.
Ahmad, Muneer; Denee, Marco Abel; Jiang, Hao; Eskicioglu, Cigdem; Kadota, Paul; Gregonia, Theresa
2016-12-01
Anaerobic digestion (AD) has been proven to be an effective process for the treatment of wastewater sludge. However, it produces high levels of ammonia in the digester effluent, which may jeopardize meeting stringent nutrient discharge limits. In this study, the effect of a sequential anaerobic/aerobic (AN/AERO) digestion and a single-stage conventional AN digestion (as control) was investigated on mixed (primary + secondary) sludge generated by the Annacis Island wastewater treatment plant (WWTP) (BC, Canada). An overall sludge retention time (SRT) of 22.5 days under three different scenarios was chosen based on the current operational SRT of the digesters at the Annacis Island WWTP. The steady state results have shown that sequential AN/AERO digestion configurations achieved up to 11% higher volatile solids (VS) removal and 72% lower ammonia generation over single-stage conventional AN digestion. Furthermore, sequential AN/AERO system also showed enhanced dewaterability, improved fecal coliform destruction and reduced digested cake odors over control digesters.
Energy Saving Melting and Revert Reduction Technology: Melting Efficiency in Die Casting Operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Schwam
2012-12-15
This project addressed multiple aspects of the aluminum melting and handling in die casting operations, with the objective of increasing the energy efficiency while improving the quality of the molten metal. The efficiency of melting has always played an important role in the profitability of aluminum die casting operations. Consequently, die casters need to make careful choices in selecting and operating melting equipment and procedures. The capital cost of new melting equipment with higher efficiency can sometimes be recovered relatively fast when it replaces old melting equipment with lower efficiency. Upgrades designed to improve energy efficiency of existing equipment maymore » be well justified. Energy efficiency is however not the only factor in optimizing melting operations. Melt losses and metal quality are also very important. Selection of melting equipment has to take into consideration the specific conditions at the die casting shop such as availability of floor space, average quantity of metal used as well as the ability to supply more metal during peaks in demand. In all these cases, it is essential to make informed decisions based on the best available data.« less
A Novel Ship-Tracking Method for GF-4 Satellite Sequential Images.
Yao, Libo; Liu, Yong; He, You
2018-06-22
The geostationary remote sensing satellite has the capability of wide scanning, persistent observation and operational response, and has tremendous potential for maritime target surveillance. The GF-4 satellite is the first geostationary orbit (GEO) optical remote sensing satellite with medium resolution in China. In this paper, a novel ship-tracking method in GF-4 satellite sequential imagery is proposed. The algorithm has three stages. First, a local visual saliency map based on local peak signal-to-noise ratio (PSNR) is used to detect ships in a single frame of GF-4 satellite sequential images. Second, the accuracy positioning of each potential target is realized by a dynamic correction using the rational polynomial coefficients (RPCs) and automatic identification system (AIS) data of ships. Finally, an improved multiple hypotheses tracking (MHT) algorithm with amplitude information is used to track ships by further removing the false targets, and to estimate ships’ motion parameters. The algorithm has been tested using GF-4 sequential images and AIS data. The results of the experiment demonstrate that the algorithm achieves good tracking performance in GF-4 satellite sequential images and estimates the motion information of ships accurately.
Tai, Yiping; McBride, Murray B; Li, Zhian
2013-03-30
In the present study, we evaluated a commonly employed modified Bureau Communautaire de Référence (BCR test) 3-step sequential extraction procedure for its ability to distinguish forms of solid-phase Pb in soils with different sources and histories of contamination. When the modified BCR test was applied to mineral soils spiked with three forms of Pb (pyromorphite, hydrocerussite and nitrate salt), the added Pb was highly susceptible to dissolution in the operationally-defined "reducible" or "oxide" fraction regardless of form. When three different materials (mineral soil, organic soil and goethite) were spiked with soluble Pb nitrate, the BCR sequential extraction profiles revealed that soil organic matter was capable of retaining Pb in more stable and acid-resistant forms than silicate clay minerals or goethite. However, the BCR sequential extraction for field-collected soils with known and different sources of Pb contamination was not sufficiently discriminatory in the dissolution of soil Pb phases to allow soil Pb forms to be "fingerprinted" by this method. It is concluded that standard sequential extraction procedures are probably not very useful in predicting lability and bioavailability of Pb in contaminated soils. Copyright © 2013 Elsevier B.V. All rights reserved.
Satellite services system analysis study. Volume 3: Service equipment requirements
NASA Technical Reports Server (NTRS)
1981-01-01
Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.
14 CFR 135.157 - Oxygen equipment requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Oxygen equipment requirements. 135.157... Equipment § 135.157 Oxygen equipment requirements. (a) Unpressurized aircraft. No person may operate an unpressurized aircraft at altitudes prescribed in this section unless it is equipped with enough oxygen...
14 CFR 135.157 - Oxygen equipment requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Oxygen equipment requirements. 135.157... Equipment § 135.157 Oxygen equipment requirements. (a) Unpressurized aircraft. No person may operate an unpressurized aircraft at altitudes prescribed in this section unless it is equipped with enough oxygen...
14 CFR 135.157 - Oxygen equipment requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Oxygen equipment requirements. 135.157... Equipment § 135.157 Oxygen equipment requirements. (a) Unpressurized aircraft. No person may operate an unpressurized aircraft at altitudes prescribed in this section unless it is equipped with enough oxygen...
14 CFR 135.157 - Oxygen equipment requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Oxygen equipment requirements. 135.157... Equipment § 135.157 Oxygen equipment requirements. (a) Unpressurized aircraft. No person may operate an unpressurized aircraft at altitudes prescribed in this section unless it is equipped with enough oxygen...
14 CFR 135.157 - Oxygen equipment requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Oxygen equipment requirements. 135.157... Equipment § 135.157 Oxygen equipment requirements. (a) Unpressurized aircraft. No person may operate an unpressurized aircraft at altitudes prescribed in this section unless it is equipped with enough oxygen...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keck, R.D.
1997-01-21
The purpose of this document is to record the technical evaluation of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements, WHC-SD-CP-OSR- 010, Rev. 0. Kay 1994, Section 3.2.3, `Supply Ventilation System Seismic Shutdown.` This document, with its appendices, provides the following: 1. The system functional requirements for determining system operability (Section 3). 2. Evaluations of equipment to determine the safety boundary for the system (Section 4). 3. A list of annotated drawings which show the safety envelope boundaries (Appendix C). 4. A list of the safety envelope equipment (Appendix B). 5. Functionalmore » requirements for the individual safety envelope equipment, including appropriate setpoints and process parameters (Section 4.1). 6. A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the system equipment within the safety envelope (Sections 5 and 6 and Appendix A).« less
2006-08-15
Programs Section 3. Sampling Equipment Sampling Equipment Solid-State Army Miniature (SSAM) trap ABC style trap Encephalitis Vector Survey Trap CDC...Baseline Survey - these are conducted to determine the types of vectors and pests occurring in the area of operations, their respective breeding sites...or source habitat, and seasonal activity patterns. Operational Survey - data collected in an operational survey are used specifically to aid pest
Code of Federal Regulations, 2012 CFR
2012-07-01
... (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS CHILD LABOR REGULATIONS, ORDERS AND... American National Standard for Equipment Technology and Operations for Wastes and Recyclable Materials... Standard ANSI Z245.5-2004 American National Standard for Equipment Technology and Operations for Wastes and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS CHILD LABOR... National Standard for Equipment Technology and Operations for Wastes and Recyclable Materials—Baling... Standard ANSI Z245.2-1997 (“American National Standard for Equipment Technology and Operations for Wastes...
Code of Federal Regulations, 2013 CFR
2013-07-01
... (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS CHILD LABOR REGULATIONS, ORDERS AND... American National Standard for Equipment Technology and Operations for Wastes and Recyclable Materials... Standard ANSI Z245.5-2004 American National Standard for Equipment Technology and Operations for Wastes and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS CHILD LABOR REGULATIONS, ORDERS AND... American National Standard for Equipment Technology and Operations for Wastes and Recyclable Materials... Standard ANSI Z245.5-2004 American National Standard for Equipment Technology and Operations for Wastes and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR REGULATIONS CHILD LABOR REGULATIONS, ORDERS AND... American National Standard for Equipment Technology and Operations for Wastes and Recyclable Materials... Standard ANSI Z245.5-2004 American National Standard for Equipment Technology and Operations for Wastes and...
three consecutive minutes, except under the following conditions: 1) to operate power takeoff equipment including, but not limited to, cement mixers, refrigeration systems, and delivery vehicles; 2) to operate private passenger vehicles; or 3) to operate heating equipment for five minutes when the ambient
46 CFR 76.35-15 - Operation and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...
Cost estimation and analysis using the Sherpa Automated Mine Cost Engineering System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stebbins, P.E.
1993-09-01
The Sherpa Automated Mine Cost Engineering System is a menu-driven software package designed to estimate capital and operating costs for proposed surface mining operations. The program is engineering (as opposed to statistically) based, meaning that all equipment, manpower, and supply requirements are determined from deposit geology, project design and mine production information using standard engineering techniques. These requirements are used in conjunction with equipment, supply, and labor cost databases internal to the program to estimate all associated costs. Because virtually all on-site cost parameters are interrelated within the program, Sherpa provides an efficient means of examining the impact of changesmore » in the equipment mix on total capital and operating costs. If any aspect of the operation is changed, Sherpa immediately adjusts all related aspects as necessary. For instance, if the user wishes to examine the cost ramifications of selecting larger trucks, the program not only considers truck purchase and operation costs, it also automatically and immediately adjusts excavator requirements, operator and mechanic needs, repair facility size, haul road construction and maintenance costs, and ancillary equipment specifications.« less
Code of Federal Regulations, 2012 CFR
2012-10-01
... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...
Code of Federal Regulations, 2013 CFR
2013-10-01
... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...
Code of Federal Regulations, 2011 CFR
2011-10-01
... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...
Code of Federal Regulations, 2010 CFR
2010-10-01
... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...
ERIC Educational Resources Information Center
Alberta Advanced Education and Technology, 2005
2005-01-01
The graduate of the Crane and Hoisting Equipment Operator Boom Truck Operator apprenticeship program is a certified journeyperson who will be able to: (1) responsibly do all work tasks expected of a journeyperson; (2) correctly use and care for tools and materials which are required to carry out the normal service and maintenance of the machines…
R.B. Gardner
1966-01-01
Describes a typical logging system used in the Lake and Northeastern States, discusses each step in the operation, and presents a simple method for designing and efficient logging system for such an operation. Points out that a system should always be built around the key piece of equipment, which is usually the skidder. Specific equipment types and their production...
Serious Injury and Fatality Investigations Involving Pneumatic Nail Guns, 1985-2012
Lowe, Brian D.; Albers, James T.; Hudock, Stephen D.; Krieg, Edward F.
2016-01-01
Background This paper examines serious and fatal pneumatic nail gun (PNG) injury investigations for workplace, tool design, and human factors relevant to causation and resulting OS&H authorities’ responses in terms of citations and penalties. Methods The U.S. OSHA database of Fatality and Catastrophe Investigation Summaries (F&CIS) were reviewed (1985 - 2012) to identify n=258 PNG accidents. Results 79.8% of investigations, and 100% of fatalities, occurred in the Construction industry. Between 53-71% of injuries appear preventable had a safer sequential trigger tool been used. Citations and monetary penalties were related to injury severity, body part injured, disabling of safety devices, and insufficient personal protective equipment (PPE). Conclusions Differences may exist between Construction and other industries in investigators interpretations of PNG injury causation and resulting citations/penalties. Violations of PPE standards were penalized most severely, yet the preventive effect of PPE would likely have been less than that of a safer sequential trigger. PMID:26725335
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buddemeier, Brooke R.; Wood-Zika, Annmarie R.; Haynes, Daniel
The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection (PRND) equipment to provide state and local agencies with scientific guidance on how to effectively use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed by technology manufacturers and purchased by responders for preventive detection and source interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management (CM) response take place, as it is currently the most widely available and fieldedmore » radiological instrumentation by state and local agencies. This effort will provide scientific guidance on the most effective way to utilize this class of equipment for consequence management missions. Gaining a better understanding of how PRND equipment can operate and perform for these missions will allow for recommendations on the tactical approach responders can use for consequence management operations. PRND equipment has been placed into service by federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be leveraged to support the emergency response in the aftermath of a radiological or nuclear event. With several hundred makes and models of PRND equipment, often with significantly different detection capabilities that do not align with their nominal PRND equipment type, development of a streamlined categorization scheme with respect to consequence management missions was the first step to identifying safe and effective uses of PRND equipment for radiological/nuclear incident response.« less
Ultrasensitive surveillance of sensors and processes
Wegerich, Stephan W.; Jarman, Kristin K.; Gross, Kenneth C.
2001-01-01
A method and apparatus for monitoring a source of data for determining an operating state of a working system. The method includes determining a sensor (or source of data) arrangement associated with monitoring the source of data for a system, activating a method for performing a sequential probability ratio test if the data source includes a single data (sensor) source, activating a second method for performing a regression sequential possibility ratio testing procedure if the arrangement includes a pair of sensors (data sources) with signals which are linearly or non-linearly related; activating a third method for performing a bounded angle ratio test procedure if the sensor arrangement includes multiple sensors and utilizing at least one of the first, second and third methods to accumulate sensor signals and determining the operating state of the system.
Ultrasensitive surveillance of sensors and processes
Wegerich, Stephan W.; Jarman, Kristin K.; Gross, Kenneth C.
1999-01-01
A method and apparatus for monitoring a source of data for determining an operating state of a working system. The method includes determining a sensor (or source of data) arrangement associated with monitoring the source of data for a system, activating a method for performing a sequential probability ratio test if the data source includes a single data (sensor) source, activating a second method for performing a regression sequential possibility ratio testing procedure if the arrangement includes a pair of sensors (data sources) with signals which are linearly or non-linearly related; activating a third method for performing a bounded angle ratio test procedure if the sensor arrangement includes multiple sensors and utilizing at least one of the first, second and third methods to accumulate sensor signals and determining the operating state of the system.
Managing the equipment service life in rendering engineering support to NPP operation
NASA Astrophysics Data System (ADS)
Ryasnyy, S. I.
2015-05-01
Apart from subjecting metal to nondestructive testing and determining its actual state, which are the traditional methods used for managing the service life of NPP equipment during its operation, other approaches closely linked with rendering engineering support to NPP operation have emerged in recent decades, which, however, have been covered in publications to a lesser extent. Service life management matters occupy the central place in the structure of engineering support measures. Application of the concept of repairing NPP equipment based on assessing its technical state and the risk of its failure makes it possible to achieve significantly smaller costs for maintenance and repairs and produce a larger amount of electricity due to shorter planned outages. Decreasing the occurrence probability of a process-related abnormality through its prediction is a further development of techniques for monitoring the technical state of equipment and systems. The proposed and implemented procedure for predicting the occurrence of process-related deviations from normal NPP operation opens the possibility to record in the online mode the trends in changes of process parameters that are likely to lead to malfunctions in equipment operation and to reduce the probability of power unit unloading when an abnormal technical state of equipment occurs and develops by recording changes in the state at an early stage and taking timely corrective measures. The article presents the structure of interconnections between the objectives and conditions of adjustment and commissioning tests, in which the management of equipment service life (saving and optimizing the service life) occupies the central place. Special attention is paid to differences in resource saving and optimization measures.
33 CFR 159.7 - Requirements for vessel operators.
Code of Federal Regulations, 2014 CFR
2014-07-01
...; or (4) Locking the door to the space enclosing the toilets with a padlock or door handle key lock. (c... person may operate any vessel equipped with installed toilet facilities unless it is equipped with: (1...
33 CFR 159.7 - Requirements for vessel operators.
Code of Federal Regulations, 2012 CFR
2012-07-01
...; or (4) Locking the door to the space enclosing the toilets with a padlock or door handle key lock. (c... person may operate any vessel equipped with installed toilet facilities unless it is equipped with: (1...
33 CFR 159.7 - Requirements for vessel operators.
Code of Federal Regulations, 2013 CFR
2013-07-01
...; or (4) Locking the door to the space enclosing the toilets with a padlock or door handle key lock. (c... person may operate any vessel equipped with installed toilet facilities unless it is equipped with: (1...
14 CFR 121.305 - Flight and navigational equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Flight and navigational equipment. 121.305... Flight and navigational equipment. No person may operate an airplane unless it is equipped with the following flight and navigational instruments and equipment: (a) An airspeed indicating system with heated...
14 CFR 121.305 - Flight and navigational equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Flight and navigational equipment. 121.305... Flight and navigational equipment. No person may operate an airplane unless it is equipped with the following flight and navigational instruments and equipment: (a) An airspeed indicating system with heated...
14 CFR 121.305 - Flight and navigational equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Flight and navigational equipment. 121.305... Flight and navigational equipment. No person may operate an airplane unless it is equipped with the following flight and navigational instruments and equipment: (a) An airspeed indicating system with heated...
14 CFR 121.305 - Flight and navigational equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Flight and navigational equipment. 121.305... Flight and navigational equipment. No person may operate an airplane unless it is equipped with the following flight and navigational instruments and equipment: (a) An airspeed indicating system with heated...
14 CFR 23.1561 - Safety equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit of...
14 CFR 23.1441 - Oxygen equipment and supply.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, or the airplane is approved for operations at or above altitudes where oxygen is...
14 CFR 23.1441 - Oxygen equipment and supply.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, or the airplane is approved for operations at or above altitudes where oxygen is...
14 CFR 23.1441 - Oxygen equipment and supply.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, or the airplane is approved for operations at or above altitudes where oxygen is...
14 CFR 23.1441 - Oxygen equipment and supply.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, or the airplane is approved for operations at or above altitudes where oxygen is...
14 CFR 23.1441 - Oxygen equipment and supply.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, or the airplane is approved for operations at or above altitudes where oxygen is...
14 CFR 23.1561 - Safety equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Safety equipment. 23.1561 Section 23.1561... Markings and Placards § 23.1561 Safety equipment. (a) Safety equipment must be plainly marked as to method of operation. (b) Stowage provisions for required safety equipment must be marked for the benefit of...
30 CFR 18.91 - Electric equipment for which field approvals will be issued.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric equipment for which field approvals... OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.91 Electric equipment...
30 CFR 18.91 - Electric equipment for which field approvals will be issued.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric equipment for which field approvals... OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.91 Electric equipment...
Direct quantum process tomography via measuring sequential weak values of incompatible observables.
Kim, Yosep; Kim, Yong-Su; Lee, Sang-Yun; Han, Sang-Wook; Moon, Sung; Kim, Yoon-Ho; Cho, Young-Wook
2018-01-15
The weak value concept has enabled fundamental studies of quantum measurement and, recently, found potential applications in quantum and classical metrology. However, most weak value experiments reported to date do not require quantum mechanical descriptions, as they only exploit the classical wave nature of the physical systems. In this work, we demonstrate measurement of the sequential weak value of two incompatible observables by making use of two-photon quantum interference so that the results can only be explained quantum physically. We then demonstrate that the sequential weak value measurement can be used to perform direct quantum process tomography of a qubit channel. Our work not only demonstrates the quantum nature of weak values but also presents potential new applications of weak values in analyzing quantum channels and operations.
Fast-responding liquid crystal light-valve technology for color-sequential display applications
NASA Astrophysics Data System (ADS)
Janssen, Peter J.; Konovalov, Victor A.; Muravski, Anatoli A.; Yakovenko, Sergei Y.
1996-04-01
A color sequential projection system has some distinct advantages over conventional systems which make it uniquely suitable for consumer TV as well as high performance professional applications such as computer monitors and electronic cinema. A fast responding light-valve is, clearly, essential for a good performing system. Response speed of transmissive LC lightvalves has been marginal thus far for good color rendition. Recently, Sevchenko Institute has made some very fast reflective LC cells which were evaluated at Philips Labs. These devices showed sub millisecond-large signal-response times, even at room temperature, and produced good color in a projector emulation testbed. In our presentation we describe our highly efficient color sequential projector and demonstrate its operation on video tape. Next we discuss light-valve requirements and reflective light-valve test results.
Cohn, J G
1975-01-01
The development of PTX, monolithic catalytic exhaust purifiers, is outlined, and their first use for exhaust emissions control of commercial equipment is described. The main use of PTX converters is on forklift trucks. The purification achievable with PTX-equipped fork-lift trucks under various operational conditions is discussed, and examples from the field are given. During more than ten years of operation, no adverse health effects have been reported, and PTX-equipped internal combustion engines appear safe for use in confined areas. PMID:50933
Meter shop equipment, techniques, and operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, R.F.
1995-12-01
The development of new equipment inevitably results in new techniques and operational procedures to be implemented. Innovative techniques can result in operational changes and the development of new equipment. An operational modification opens the door for the development of new ideas, new equipment, and new techniques. This constant cycle of change promotes a continuous series of economic evaluations and decisions. Equipment and technological changes in measuring natural gas have resulted in modifications from past practices. The changes underway today will influence the way we plan and budget for the future, and, most notably, will change the way we repair gasmore » meters. The meter shop of today will need to look at the way that these changes will become available and how they will help efforts in reducing costs and increasing productivity. For instance, the standard three- and four-chambered diaphragm gas meter design has not been significantly changed in the past few decades aside from having heavy, cast iron bodies changed to lightweight aluminum bodies and utilizing a few plastic parts. But changes have been made, and more are on the threshold.« less
Establishing the Learning Curve of Robotic Sacral Colpopexy in a Start-up Robotics Program.
Sharma, Shefali; Calixte, Rose; Finamore, Peter S
2016-01-01
To determine the learning curve of the following segments of a robotic sacral colpopexy: preoperative setup, operative time, postoperative transition, and room turnover. A retrospective cohort study to determine the number of cases needed to reach points of efficiency in the various segments of a robotic sacral colpopexy (Canadian Task Force II-2). A university-affiliated community hospital. Women who underwent robotic sacral colpopexy at our institution from 2009 to 2013 comprise the study population. Patient characteristics and operative reports were extracted from a patient database that has been maintained since the inception of the robotics program at Winthrop University Hospital and electronic medical records. Based on additional procedures performed, 4 groups of patients were created (A-D). Learning curves for each of the segment times of interest were created using penalized basis spline (B-spline) regression. Operative time was further analyzed using an inverse curve and sequential grouping. A total of 176 patients were eligible. Nonparametric tests detected no difference in procedure times between the 4 groups (A-D) of patients. The preoperative and postoperative points of efficiency were 108 and 118 cases, respectively. The operative points of proficiency and efficiency were 25 and 36 cases, respectively. Operative time was further analyzed using an inverse curve that revealed that after 11 cases the surgeon had reached 90% of the learning plateau. Sequential grouping revealed no significant improvement in operative time after 60 cases. Turnover time could not be assessed because of incomplete data. There is a difference in the operative time learning curve for robotic sacral colpopexy depending on the statistical analysis used. The learning curve of the operative segment showed an improvement in operative time between 25 and 36 cases when using B-spline regression. When the data for operative time was fit to an inverse curve, a learning rate of 11 cases was appreciated. Using sequential grouping to describe the data, no improvement in operative time was seen after 60 cases. Ultimately, we believe that efficiency in operative time is attained after 30 to 60 cases when performing robotic sacral colpopexy. The learning curve for preoperative setup and postoperative transition, which is reflective of anesthesia and nursing staff, was approximately 110 cases. Copyright © 2016 AAGL. Published by Elsevier Inc. All rights reserved.
A LabVIEW based template for user created experiment automation.
Kim, D J; Fisk, Z
2012-12-01
We have developed an expandable software template to automate user created experiments. The LabVIEW based template is easily modifiable to add together user created measurements, controls, and data logging with virtually any type of laboratory equipment. We use reentrant sequential selection to implement sequence script making it possible to wrap a long series of the user created experiments and execute them in sequence. Details of software structure and application examples for scanning probe microscope and automated transport experiments using custom built laboratory electronics and a cryostat are described.
Parallel Event Analysis Under Unix
NASA Astrophysics Data System (ADS)
Looney, S.; Nilsson, B. S.; Oest, T.; Pettersson, T.; Ranjard, F.; Thibonnier, J.-P.
The ALEPH experiment at LEP, the CERN CN division and Digital Equipment Corp. have, in a joint project, developed a parallel event analysis system. The parallel physics code is identical to ALEPH's standard analysis code, ALPHA, only the organisation of input/output is changed. The user may switch between sequential and parallel processing by simply changing one input "card". The initial implementation runs on an 8-node DEC 3000/400 farm, using the PVM software, and exhibits a near-perfect speed-up linearity, reducing the turn-around time by a factor of 8.
48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...
48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...
48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...
NASA Astrophysics Data System (ADS)
Gragne, A. S.; Sharma, A.; Mehrotra, R.; Alfredsen, K. T.
2012-12-01
Accuracy of reservoir inflow forecasts is instrumental for maximizing value of water resources and influences operation of hydropower reservoirs significantly. Improving hourly reservoir inflow forecasts over a 24 hours lead-time is considered with the day-ahead (Elspot) market of the Nordic exchange market in perspectives. The procedure presented comprises of an error model added on top of an un-alterable constant parameter conceptual model, and a sequential data assimilation routine. The structure of the error model was investigated using freely available software for detecting mathematical relationships in a given dataset (EUREQA) and adopted to contain minimum complexity for computational reasons. As new streamflow data become available the extra information manifested in the discrepancies between measurements and conceptual model outputs are extracted and assimilated into the forecasting system recursively using Sequential Monte Carlo technique. Besides improving forecast skills significantly, the probabilistic inflow forecasts provided by the present approach entrains suitable information for reducing uncertainty in decision making processes related to hydropower systems operation. The potential of the current procedure for improving accuracy of inflow forecasts at lead-times unto 24 hours and its reliability in different seasons of the year will be illustrated and discussed thoroughly.
Guieysse, Benoit; Norvill, Zane N
2014-02-28
When direct wastewater biological treatment is unfeasible, a cost- and resource-efficient alternative to direct chemical treatment consists of combining biological treatment with a chemical pre-treatment aiming to convert the hazardous pollutants into more biodegradable compounds. Whereas the principles and advantages of sequential treatment have been demonstrated for a broad range of pollutants and process configurations, recent progresses (2011-present) in the field provide the basis for refining assessment of feasibility, costs, and environmental impacts. This paper thus reviews recent real wastewater demonstrations at pilot and full scale as well as new process configurations. It also discusses new insights on the potential impacts of microbial community dynamics on process feasibility, design and operation. Finally, it sheds light on a critical issue that has not yet been properly addressed in the field: integration requires complex and tailored optimization and, of paramount importance to full-scale application, is sensitive to uncertainty and variability in the inputs used for process design and operation. Future research is therefore critically needed to improve process control and better assess the real potential of sequential chemical-biological processes for industrial wastewater treatment. Copyright © 2013 Elsevier B.V. All rights reserved.
49 CFR 1180.8 - Operational data.
Code of Federal Regulations, 2012 CFR
2012-10-01
... any deferred maintenance or delayed capital improvements on any road or equipment properties involved... consolidations. (3) The anticipated equipment requirements of the proposed system, including locomotives, rolling stock by type, and maintenance-of-way equipment; plans for acquisition and retirement of equipment...
49 CFR 1180.8 - Operational data.
Code of Federal Regulations, 2013 CFR
2013-10-01
... any deferred maintenance or delayed capital improvements on any road or equipment properties involved... consolidations. (3) The anticipated equipment requirements of the proposed system, including locomotives, rolling stock by type, and maintenance-of-way equipment; plans for acquisition and retirement of equipment...
... be involved in RIT. top of page What equipment is used? In addition to equipment needed to ... dimensional images. top of page Who operates the equipment? A radiologist who has specialized training in nuclear ...
NASA Astrophysics Data System (ADS)
Rezinskikh, V. F.; Grin', E. A.
2013-01-01
The problem concerned with safe and reliable operation of ageing heat-generating and mechanical equipment of thermal power stations is discussed. It is pointed out that the set of relevant regulatory documents serves as the basis for establishing an efficient equipment diagnostic system. In this connection, updating the existing regulatory documents with imparting the required status to them is one of top-priority tasks. Carrying out goal-oriented scientific research works is a necessary condition for solving this problem as well as other questions considered in the paper that are important for ensuring reliable performance of equipment operating for a long period of time. In recent years, the amount of such works has dropped dramatically, although the need for them is steadily growing. Unbiased assessment of the technical state of equipment that has been in operation for a long period of time is an important aspect in solving the problem of ensuring reliable and safe operation of thermal power stations. Here, along with the quality of diagnostic activities, monitoring of technical state performed on the basis of an analysis of statistical field data and results of operational checks plays an important role. The need to concentrate efforts taken in the mentioned problem areas is pointed out, and it is indicated that successful implementation of the outlined measures requires proper organization and efficient operation of a system for managing safety in the electric power industry.
Mbembati, Naboth A; Mwangu, Mugwira; Muhondwa, Eustace P Y; Leshabari, Melkizedek M
2008-04-01
Muhimbili National Hospital (MNH), a teaching and national referral hospital, is undergoing major reforms to improve the quality of health care. We performed a retrospective descriptive study using a set of performance indicators for the surgical and laboratory services of MNH in years 2001 and 2002, to help monitor and evaluate the impact of reforms on the quality of health care during and after the reform process. Hospital records were reviewed and information recorded for planned and postponed operations, laboratory equipment, reagents, laboratory tests and quality assurance programmes. In the year 2001 a total of 4332 non-emergency operations were planned, 3313 operations were performed and 1019 (23.5%) operations were postponed. In the year 2002, 4301 non-emergency operations were planned, 3046 were performed and 1255 (29%) were postponed. The most common reasons for operation postponement were "time-barred", interference by emergency operations, no show of patients and inoperable anaesthetic machines. Equipment problems and supply and staff shortages together accounted for one quarter of postponements. In the laboratory, a lack of equipment prevented some tests, but quality assurance was performed for most tests. Current surgical services at MNH are inadequate; operating theatres require modern, functioning equipment and adequate supplies of consumables to provide satisfactory care.
Pressure Safety: Advanced Live 11459
DOE Office of Scientific and Technical Information (OSTI.GOV)
Glass, George
Many Los Alamos National Laboratory (LANL) operations use pressure equipment and systems. Failure to follow proper procedures when designing or operating pressure systems can result in injuries to personnel and damage to equipment and/or the environment. This manual presents an overview of the requirements and recommendations that address the safe design and operation of pressure systems at LANL.
ERIC Educational Resources Information Center
Weisburd, Melvin I.
The Field Operations and Enforcement Manual for Air Pollution Control, Volume II, explains in detail the following: technology of source control, modification of operations, particulate control equipment, sulfur dioxide removal systems for power plants, and control equipment for gases and vapors; inspection procedures for general sources, fuel…
The purpose of this SOP is to describe the procedures for using and maintaining the related microcomputer equipment at the Illinois Institute of Technology (IIT)/NHEXAS site. These methods were used in all data operations and maintenance routines during the NHEXAS project and th...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 2 2010-04-01 2010-04-01 false What quality control operations are required for equipment, instruments, and controls? 111.117 Section 111.117 Food and Drugs FOOD AND DRUG ADMINISTRATION... and Process Control System: Requirements for Quality Control § 111.117 What quality control operations...
The STD Site Operator. Satellite Technology Demonstration, Technical Report No. 0419.
ERIC Educational Resources Information Center
Braunstein, Jean
Intimately involved in any equipment system is the human factor. The people operating the equipment at the remote installations for the Satellite Technology Demonstration (STD) were different from paid employees or from private consumers. The STD site operators were paid only token fees; thus, they are best describd as having been motivated by the…
Heavy construction equipment noise study using dosimetry and time-motion studies
NASA Astrophysics Data System (ADS)
Spencer, Ellsworth R.; Yantek, David S.
2005-09-01
Noise-induced hearing loss continues to afflict workers in many occupational settings despite longstanding recognition of the problems and well-known methods of prevention and regulations. Sound levels associated with heavy construction equipment range from 80 to 120 dB(A) and power tools commonly used in construction produce sound levels up to 115 dB(A). The focus of the research was to determine the noise exposures of heavy construction equipment operators while documenting the workers' tasks, (i.e., hauling, moving, and/or pushing construction material). Time-motion studies were performed at the construction sites and were used to correlate the noise dosage with the work performed by equipment operators. The cumulative dose for the operator was then plotted with references to work tasks, to identify the tasks that caused the greatest noise exposure. Three construction sites were examined and located in the western Pennsylvania and eastern Ohio areas. The types of construction equipment studied included asphalt pavers, backhoes, bulldozers, compaction equipment, excavators, haul trucks, telehandlers, and wheeled loaders. The results showed that bulldozer operators consistently had the highest noise exposures, ranging from a NIOSH REL (Recommended Exposure Limit) dose of 844% to 25
Income and children's behavioral functioning: a sequential mediation analysis.
Shelleby, Elizabeth C; Votruba-Drzal, Elizabeth; Shaw, Daniel S; Dishion, Thomas J; Wilson, Melvin N; Gardner, Frances
2014-12-01
Children from low-income households tend to exhibit higher levels of conduct problems and emotional problems, yet the pathways linking economic disadvantage to children's behavioral functioning are not well understood. This study uses data from the Early Steps Multisite (ESM) project (N = 731) to investigate associations between family income in early childhood and children's conduct problems and emotional problems in middle childhood. The study explores whether the associations from income to child conduct problems and emotional problems operate through maternal depressive symptoms and 3 family risk factors in early childhood-harsh parenting, parenting hassles, and chaos in the home environment. Results of a sequential mediation model revealed significant indirect effects of family income on children's conduct problems operating through maternal depressive symptoms and parenting hassles and indirect effects of family income on children's emotional problems operating through maternal depressive symptoms, chaos in the home environment, and parenting hassles. Implications of these findings for understanding processes through which income influences child functioning are discussed.
Instrument Control (iC) – An Open-Source Software to Automate Test Equipment
Pernstich, K. P.
2012-01-01
It has become common practice to automate data acquisition from programmable instrumentation, and a range of different software solutions fulfill this task. Many routine measurements require sequential processing of certain tasks, for instance to adjust the temperature of a sample stage, take a measurement, and repeat that cycle for other temperatures. This paper introduces an open-source Java program that processes a series of text-based commands that define the measurement sequence. These commands are in an intuitive format which provides great flexibility and allows quick and easy adaptation to various measurement needs. For each of these commands, the iC-framework calls a corresponding Java method that addresses the specified instrument to perform the desired task. The functionality of iC can be extended with minimal programming effort in Java or Python, and new measurement equipment can be addressed by defining new commands in a text file without any programming. PMID:26900522
Instrument Control (iC) - An Open-Source Software to Automate Test Equipment.
Pernstich, K P
2012-01-01
It has become common practice to automate data acquisition from programmable instrumentation, and a range of different software solutions fulfill this task. Many routine measurements require sequential processing of certain tasks, for instance to adjust the temperature of a sample stage, take a measurement, and repeat that cycle for other temperatures. This paper introduces an open-source Java program that processes a series of text-based commands that define the measurement sequence. These commands are in an intuitive format which provides great flexibility and allows quick and easy adaptation to various measurement needs. For each of these commands, the iC-framework calls a corresponding Java method that addresses the specified instrument to perform the desired task. The functionality of iC can be extended with minimal programming effort in Java or Python, and new measurement equipment can be addressed by defining new commands in a text file without any programming.
Error-correction coding for digital communications
NASA Astrophysics Data System (ADS)
Clark, G. C., Jr.; Cain, J. B.
This book is written for the design engineer who must build the coding and decoding equipment and for the communication system engineer who must incorporate this equipment into a system. It is also suitable as a senior-level or first-year graduate text for an introductory one-semester course in coding theory. Fundamental concepts of coding are discussed along with group codes, taking into account basic principles, practical constraints, performance computations, coding bounds, generalized parity check codes, polynomial codes, and important classes of group codes. Other topics explored are related to simple nonalgebraic decoding techniques for group codes, soft decision decoding of block codes, algebraic techniques for multiple error correction, the convolutional code structure and Viterbi decoding, syndrome decoding techniques, and sequential decoding techniques. System applications are also considered, giving attention to concatenated codes, coding for the white Gaussian noise channel, interleaver structures for coded systems, and coding for burst noise channels.
Warranty-Guarantee Application Guidelines for Air Force Ground Electronic Equipment.
1980-02-01
perform the on-equipment maintenance. The procedure is comparable to existing Mobile Depot Mainte- nance. The extended outage of failed equipment may be...currently computed. However, because the equipment is fixed geographically, in contrast to the mobility of avionics equipment, operating-time logs could...base environment, many other items of ground equip- ment are deployed at a remote location or, particularly in TAC, may be mobile equipment not
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... procedure for commercial refrigeration equipment because the equipment cannot operate at the specified... Program for certain industrial equipment, which includes commercial refrigeration equipment, the focus of... establish and amend test procedures for commercial refrigeration equipment. (42 U.S.C. 6314(a)(6)(C)) On...
2006-10-01
C L A S I F I C A T I O N An Assessment of ELINT Exploitation for Situational Awareness Visualisations on Operator Situational...environment. The An Assessment of ELINT Exploitation for Situational Awareness Visualisations on Operator Situational Awareness EXECUTIVE SUMMARY...1. ELEXSA’s Process of Sequential Enrichment. 2 Figure 2. Sample ELEXSA Visualisation . 3 Figure 3. Example Llama/Cheetah Network Layout. 5
33 CFR 149.660 - What are the requirements for emergency power?
Code of Federal Regulations, 2010 CFR
2010-07-01
... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT Design and... complex must have emergency power equipment including power source, associated transforming equipment, and...; (4) Radar equipment; (5) Alarm systems; (6) Electrically operated fire pumps; and (7) Other...
33 CFR 149.660 - What are the requirements for emergency power?
Code of Federal Regulations, 2011 CFR
2011-07-01
... SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: DESIGN, CONSTRUCTION, AND EQUIPMENT Design and... complex must have emergency power equipment including power source, associated transforming equipment, and...; (4) Radar equipment; (5) Alarm systems; (6) Electrically operated fire pumps; and (7) Other...
40 CFR 63.802 - Emission limits.
Code of Federal Regulations, 2014 CFR
2014-07-01
... meet the upholstered seating flammability requirements of California Technical Bulletin 116, 117, or... owner or operator must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution...
40 CFR 63.802 - Emission limits.
Code of Federal Regulations, 2013 CFR
2013-07-01
... meet the upholstered seating flammability requirements of California Technical Bulletin 116, 117, or... owner or operator must operate and maintain any affected source, including associated air pollution control equipment and monitoring equipment, in a manner consistent with safety and good air pollution...
Permit Regulations for the Construction and/or Operation of Air Emissions Equipment involved in ambient air quality standards & regulations in MS + where to obtain copies of referenced federal regulations