ERIC Educational Resources Information Center
Indiana State Univ., Terre Haute. Blumberg Center for Interdisciplinary Studies in Special Education.
This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 4-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through 2 and ages 18 through 21. The project also was designed to provide technical assistance to public and private…
LYNX community advocacy & service engagement (CASE) project final report.
DOT National Transportation Integrated Search
2009-05-14
This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...
ERIC Educational Resources Information Center
Griffith, William S.; And Others
This document, consisting of seven chapters and 12 appendixes, is a full final report of the Doolittle Family Education Center Experimental In-Service Training Project. Chapter II consists of the history and plan of the project including an explanation of the framework of the model that was used to conceptualize the project. Chapter III is a…
Illinois State Project: Services for Children with Deaf-Blindness Program. Final Performance Report.
ERIC Educational Resources Information Center
Dorsey, Christine
This final report describes activities and accomplishments of the Illinois state project on services for children with deaf-blindness, a 3-year federally supported project to address the needs of children (ages birth to 21) who are deaf-blind. Project activities included inservice training and technical assistance, development of a comprehensive…
Services for Children with Deaf-Blindness in Louisiana. Final Performance Report.
ERIC Educational Resources Information Center
Teddlie, Charles
This final report describes activities and accomplishments of the Services for Children with Deaf-Blindness project, a 1-year federally supported project in Louisiana to improve identification and curriculum for these children by providing technical assistance and training to parents, school systems, and agency personnel. Project activities…
Services for Children with Deaf-Blindness Pilot Project. Final Report.
ERIC Educational Resources Information Center
Stremel, Kathleen
This final report describes a pilot project, "Quality Service Provision for Infants and Young Children with Deaf-Blindness: A Mechanism for State Intervention Teams," developed and implemented at the University of Southern Mississippi. The project developed a model of an intervention team that provides intensive training and technical…
ERIC Educational Resources Information Center
New Jersey State Dept. of Education, Trenton.
This final report describes activities and accomplishments of the New Jersey Technical Assistance Project, a project to improve educational resources and support services for students with multiple sensory impairment (deaf-blindness). Activities and accomplishments are presented in a tabular format for each project goal and objective. The project…
The Delivery of Services to Children with Deaf-Blindness in West Virginia. Final Report.
ERIC Educational Resources Information Center
West Virginia State Dept. of Education, Charleston.
This final report describes activities and accomplishments of a 3-year federally supported project to improve special education and related services for children with deaf-blindness in West Virginia. The project served 94 children with deaf-blindness, their families, and service providers throughout the state. Activities and achievements are…
ERIC Educational Resources Information Center
Buckman, Rilma Oxley
The final report documents the Greater Cleveland Mental Retardation Development Project, a 5-year demonstration project concerned with solving such problems as how a community can provide all the services and programs needed by the retarded and their families, ensure successful and appropriate employment, and staff and finance such programs.…
5 CFR 470.311 - Final project approval.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...
Oregon Project for Services to Children and Youth with Deaf-Blindness. Final Performance Report.
ERIC Educational Resources Information Center
Otos, Maurine
This report describes activities and accomplishments of the Oregon Project for Services to Children and Youth with Deaf-Blindness, a 3-year federally supported project to ensure effective educational services for this population and provide support for families and service providers. The project focused on: (1) identifying additional children with…
ERIC Educational Resources Information Center
Hansen, Janet
This final performance report for the Broward County Library New Reader Services Coordinator literacy project begins with a section that provides quantitative data. The next section compares actual accomplishments to the project objectives for 1992-93, including the hiring of a new reader as coordinator for the project and the establishment of…
ERIC Educational Resources Information Center
Goertz, Lori; Franklin, Barbara
This final report describes the activities and outcomes of the California Deaf-Blind Services (CDBS) program, a regionally based, family focused technical assistance and training project designed to improve services to children with deaf-blindness. The project conducted the following activities: (1) provided technical assistance to families and…
LSCA Final Reports: Third Series.
ERIC Educational Resources Information Center
Clark, Collin, Ed.
This document includes final summary reports from 16 recent federally funded Library Services and Construction Act (LSCA) projects in California. This volume covers generally the period 1984-85, and reports are presented in six subject areas: programs for children, information and referral projects, institutional services, literacy, local history,…
ERIC Educational Resources Information Center
Koralek, Robin; Johnson, Heidi; Ratcliffe, Caroline; Vericker, Tracy
2010-01-01
This report presents the final results for the evaluation of the New Americans Centers (NACs) demonstration project in Arkansas and Iowa. It focuses on program operations and plans for program sustainability, while highlighting services provided through the demonstration projects in Arkansas and Iowa. It also documents outcomes for New Iowan…
Alabama 622 Project Services to Deaf-Blind Children. Final Report.
ERIC Educational Resources Information Center
Graham, Terry; Bosarge, Zackie
This report describes activities and accomplishments of a 3-year federally supported project to improve services to children (ages 0-21) with deaf-blindness in Alabama. The project utilized a service delivery model based on provision of state, regional, local, and individual technical assistance to service providers and families through three…
ERIC Educational Resources Information Center
Phelps, Amy L.; Dostilio, Lina
2008-01-01
The present study addresses the efficacy of using service-learning methods to meet the GAISE guidelines (http://www.amstat.org/education/gaise/GAISECollege.htm) in a second business statistics course and further explores potential advantages of assigning a service-learning (SL) project as compared to the traditional statistics project assignment.…
Final Design Report for the RH LLW Disposal Facility (RDF) Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Austad, Stephanie Lee
2015-09-01
The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.
Final Design Report for the RH LLW Disposal Facility (RDF) Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Austad, S. L.
2015-05-01
The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.
2013-02-08
Fish and Wildlife Service WRDA Water Resources Development Act Intake Project IEPR Final IEPR Report February 8, 2013 x... Wildlife Service (USFWS), Natural Resources Conservation Service (NRCS), Montana Department of Environmental Quality, The Nature Conservancy...30% design features and channel entrance and exit pre-appraisal study to provide fish passage around Intake Dam, Montana. U.S. Fish and Wildlife
ERIC Educational Resources Information Center
Townley, Charles T.
As the final report on the National Indian Education Association's (NIEA) Library Project, this document presents the following: (1) an introduction (describes the general condition of American Indian library service, the involvement of NIEA, and the project's objectives and time line); (2) the methodology of Phase I: identification of…
ERIC Educational Resources Information Center
Wickey, Jane M.; Hartman, Barbara L.
Presented is the final report of a 1-year project designed to determine the possibility of coordinating services for handicapped children in the Baltimore (Maryland) region by providing technical assistance to coalitions of decision makers at the local and regional levels. Some of the findings and conclusions drawn from the project are listed such…
ERIC Educational Resources Information Center
2000
This final performance report discusses the activities and outcomes of a project that addressed the need for training certified and highly qualified secondary special education teachers to provide classroom and transition related instruction and services to students with low incidence or severe disabilities. The project was carried out by the…
ERIC Educational Resources Information Center
Georgia State Dept. of Education, Atlanta.
This final report describes activities and accomplishments of the Georgia Deaf-Blind Project, a 3-year federally supported project encompassing 159 counties and providing technical assistance to 237 infants, children, and youth with deaf-blindness along with their families and their service providers. Project accomplishments included: (1) more…
77 FR 12646 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments.... OMB Number: 1545-1231. Regulation Project Number: IA-38-90 (Final). Abstract: These regulations set...
Minnesota Deaf-Blind Technical Assistance Project. Final Report.
ERIC Educational Resources Information Center
Kloos, Eric
This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…
78 FR 60021 - Proposed Collection: Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-30
... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-120616-03(TD 9346 Final Regulations and Removal of Temporary Regulations)] Proposed Collection: Comment Request for Regulation Project AGENCY.... Regulation Project Number: REG-120616-03 (T.D. 9346 Final Regulations and Removal of Temporary Regulations...
ERIC Educational Resources Information Center
Kelly, Dotty; Guerrero, Vincent Leon
This final report describes activities and accomplishments of the Pacific Basin Deaf-Blind Project, a 3-year federally funded project to provide technical assistance to public and private agencies, institutions, and organizations providing early intervention, educational, transitional, vocational, early identification, and related services to…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... DEPARTMENT OF AGRICULTURE Forest Service Final Tropic to Hatch 138 kV Transmission Line Project..., has prepared a Final Environmental Impact Statement (FEIS) for the Tropic to Hatch 138 kV Transmission.... ADDRESSES: Copies of the Tropic to Hatch 138 kV Transmission Line Project FEIS/PMPA for the Grand Staircase...
75 FR 2932 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-19
... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-116664-01] RIN 1545-BC15 Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION.... OMB Number: 1545-1868. Regulation Project Number: REG-116664-01 (TD 9300 (final)). Abstract: This...
Breakthrough in Rural Manpower Services. Final Report.
ERIC Educational Resources Information Center
Iowa State Employment Security Commission, Des Moines.
The Ottumwa Experimental and Demonstration Project was initiated to develop more economical and more effective ways for delivering comprehensive manpower services to residents of rural areas. The Ottumwa Project involved a fundamental restructuring of rural employment service operations--development of more effective ways of delivering effective…
Instructor Guides for Training Food Service Supervisors in Long Term Care Facilities.
ERIC Educational Resources Information Center
Eastern Iowa Community Coll. District, Davenport.
This final report describes a project to develop postsecondary teacher resource guides for supervisor courses in food service management, preparation and service of modified diets, and meal service in long-term care facilities in Iowa. Introductory material includes the following: project objective, a description of how the objective was met, the…
Services for Children with Deaf-Blindness. Final Report.
ERIC Educational Resources Information Center
Stremel, Kathleen
This final report describes the development, implementation, and evaluation of the "Services for Children with Deaf-Blindness Program" at the University of Southern Mississippi, a 3-year program authorized under the Individuals with Disabilities Education Act. The project was established to provide direct services and technical…
Interagency Planning and Support Project. Final Report.
ERIC Educational Resources Information Center
Salisbury, Christine
This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…
The Community Service Fellowship Planning Project: Final Report.
ERIC Educational Resources Information Center
McKee, Robert L.; Gaffney, Michael J.
This report describes the findings and recommendations of the Community Service Fellowship (CSF) Planning Project conducted by the American Association of Community and Junior Colleges under a grant from ACTION, the federal agency charged with promoting volunteer service. The proposed CSF program is a means of providing young people with…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-20
...We, the U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG), in cooperation with the Sonoma Land Trust (SLT), announce that a final environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and Watershed Restoration Project is now available. The final EIR/EIS, which we prepared and now announce in accordance with the National Environmental Policy Act of 1969 (NEPA), describes the restoration of approximately 2,300 acres (ac) of former farmland located in Sonoma County, California, near the San Pablo Bay. The final EIR/EIS responds to all comments we received on the draft document. The restoration project, which would be implemented by the SLT, would restore natural estuarine ecosystems on diked baylands, while providing public access and recreational and educational opportunities compatible with ecological and cultural resources protection. The U.S. Army Corps of Engineers, San Francisco District, and the National Marine Fisheries Service of the National Oceanic and Atmospheric Administration are cooperating agencies on the final EIR/EIS.
ERIC Educational Resources Information Center
Greene, Judy
Students Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its fourth year of operation. The project operated at two high schools in Brooklyn and one in Manhattan (New York). In the 1993-94 school year, the project served 393 students of…
Information Technology Team Projects in Higher Education: An International Viewpoint
ERIC Educational Resources Information Center
Lynch, Kathy; Heinze, Aleksej; Scott, Elsje
2007-01-01
It is common to find final or near final year undergraduate Information Technology students undertaking a substantial development project; a project where the students have the opportunity to be fully involved in the analysis, design, and development of an information technology service or product. This involvement has been catalyzed and prepared…
Project #8 (95-008), Traveler Information Services (TIS), Final Report
DOT National Transportation Integrated Search
1995-12-15
THE L-95 CORRIDOR COALITION'S TRAVELER INFORMATION SERVICES (TIS) PROJECT IS INTENDED TO IMPLEMENT AN ADVANCED TRAVELER INFORMATION SYSTEM TAILORED TO THE UNIQUE NEEDS OF THE NORTHEAST CORRIDOR. THE SYSTEM WILL ACQUIRE AND DISSEMINATE INFORMATION ON ...
ERIC Educational Resources Information Center
Filatov, Ksenia; Pill, Shane
2015-01-01
No literature exists on English teaching efficacy or self-efficacy or on pre-service teachers' English teaching self-efficacy and its relationship to pre-service teacher education. This project addressed this conceptual and methodological gap in current teacher efficacy research literature. Five pre-service English teachers in their final year of…
ERIC Educational Resources Information Center
Musante, Patricia
This report presents an evaluation of Bilingual Enrichment Services and Training (Project BEST), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at four schools in Manhattan. The project served 266 Cantonese-, Fukienese, and Mandarin-speaking gifted students of limited English proficiency.…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Educational Research.
Student Upgrading through Computer and Career Education System Services (Project SUCCESS) was an Elementary and Secondary Education Act Title VII-funded project in its third year of operation. Project SUCCESS served 460 students of limited English proficiency at two high schools in Brooklyn and one high school in Manhattan (New York City).…
ERIC Educational Resources Information Center
Ross-Gordon, Jovita M.; And Others
The Services for Transition to Independence through Education (STRIDE) project evaluated a model for providing comprehensive training and employment services to adults with mild handicaps, using existing vocational education classes and special needs support programs in a secondary vocational technical school in Altoona, Pennsylvania. Services…
Educational Services for Home Day Caregivers. Final Report.
ERIC Educational Resources Information Center
Colbert, Janice C.; And Others
The research project described in this report (Educational Services for Home Day Care Sub-Professionals) examines the education/training needs of a group of women who are licensed home day caregivers and who provide day care services to preschool children for a fee. This project represents an attempt undertaken by an urban university working in…
Adult Services in the Eighties: Final Report.
ERIC Educational Resources Information Center
Heim, Kathleen M.
The American Library Association's (ALA) Adult Services in the Eighties (ASE) project was undertaken to supply information about areas of current and unique concentration to aid librarians in identifying, describing, and planning the scope of adult services in their own libraries. The ASE project updates a study conducted in 1954--the most recent…
ERIC Educational Resources Information Center
Stein, Laszlo; Pien, Diana
The document contains the final report of the HI-MAPS project, designed to develop a model program that would meet the medical, academic, and psychological needs of young hearing handicapped children, birth to 3 years, and their families in Chicago. An introductory section reviews project rationale, project philosophy, and overall project goals.…
ERIC Educational Resources Information Center
Harrison, Holly
This final report describes activities and accomplishments of the Through Shared Windows (TSW) Outreach Project, a 4-year project at the University of New Mexico designed to improve services to young children with disabilities and their families. Three major outcomes were accomplished. First, a Web site was developed that focuses on observational…
ERIC Educational Resources Information Center
Clarke, Candice
This report presents an evaluation of the Bilingual Academic and Career Education Services for Hispanic High School Students (Project BACES), an Elementary and Secondary Education Act Title VII-funded project in its third year of operation at DeWitt Clinton High School in the Bronx and George Washington High School in Manhattan. The project served…
This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at Golden Hills Community Services District (GHCSD) located in Tehachapi, CA. The objectives of the project were to evaluate (1) the effecti...
Project L'Ouverture, 1981-1982. O.E.E. Final Evaluation Report.
ERIC Educational Resources Information Center
Keane, Demetra Nicolau; And Others
Originally proposed as a supplement to basic bilingual programs for Haitian students in three New York City high schools, Project L'Ouverture changed its focus to the development and reinforcement of basic skills. In response to a need for basic bilingual services not available in participating schools, the project provided tutorial services to…
ERIC Educational Resources Information Center
Shaw, Estelle; And Others
The monograph describes Project INTERFACE, a 2-year collaborative effort among the Board of Cooperative Educational Services (BOCES) of Nassau County (New York), Long Island University, and three local school districts. The project identified the "most effective" implementation strategies for integrating microcomputer instruction into…
Arizona Deafblind Project, 1995-1999. Final Report.
ERIC Educational Resources Information Center
Arizona State School for the Deaf and Blind, Tucson.
This final report describes accomplishments of the four-year federally funded Arizona Deafblind Project which attempted to: (1) identify all deafblind children in Arizona; (2) deliver technical assistance to families; (3) deliver technical assistance to service providers; and (4) enhance community oversight, coordination, and collaboration with…
ERIC Educational Resources Information Center
Cowley, Dan
This report presents comprehensive documentation for the Mental Health Associate Training Project at Wayne Community College. The report is composed of twelve sections describing: (1) the changing nature, philosophy and scope of the human services as a system; (2) the characteristics of the college service area; (3) general information about Wayne…
RETRAINING OLDER ADULTS FOR EMPLOYMENT IN COMMUNITY SERVICE. FINAL PROGRESS REPORT.
ERIC Educational Resources Information Center
THUNE, JEANNE M.; TINE, SEBASTIAN
THIS PROJECT SOUGHT TO DEMONSTRATE THE CAPABILITY OF OLDER ADULTS TO BEGIN NEW CAREERS AS LEADERS IN COMMUNITY SERVICES. PROJECT STAFF OFFERED FIVE 3-MONTH TRAINING INSTITUTES IN COMMUNITY SERVICE IN NASHVILLE, TENNESSEE, DURING 1963-65 WITH THE HELP OF CONSULTANTS AND REPRESENTATIVES OF PUBLIC AND PRIVATE AGENCIES AND SEVERAL AREA UNIVERSITIES.…
ERIC Educational Resources Information Center
Clements, Hubert M.; And Others
A 3-year demonstration project focused on the vocational rehabilitation rehabilitation of selective service rejectees in a five-county area in Central South Carolina. In 1962, over 50 percent of South Carolina's young men who were examined for military service were rejected for failure to meet physical and/or mental requirements. Of 1,450…
ERIC Educational Resources Information Center
Duque, Diana L.
Harmony in Career Learning and Scholastic System (Project HI-CLASS) was a Transitional Bilingual Education Title VII-funded program in its fifth and final year in 1992-93. The project offered instructional and support services to 641 students of limited English proficiency (LEP) at three sites, all of which had many immigrant students, in…
LSCA Final Reports: Second Series.
ERIC Educational Resources Information Center
Clark, Collin, Ed.
This document includes final summary reports from recent federally funded Library Services and Construction Act (LSCA) demonstration projects in California. While some projects reported at length and others provided the bare facts, reports are excerpted but published as received, without editing beyond a uniform first page. The Summary Report Form…
Wyoming Deaf/Blind Grant. Final Report.
ERIC Educational Resources Information Center
Whitson, Joanne B.
This final report describes activities and accomplishments of the Wyoming Deaf-Blind Grant, a 3-year federally supported project to identify children who have deaf-blindness and to provide technical assistance in the development of educational services for these children. Major accomplishments of the project included: identification of more…
Studying the Cost and Value of Library Services: Final Report. Technical Report APLAB/94-3/1,2,3,4.
ERIC Educational Resources Information Center
Kantor, Paul B.; And Others
This is the final technical report (in three parts) of a 15-month long project to study the costs and value of library functions at five major research libraries. Twenty-one services or service aspects were studied, and numerous measures of the importance or benefit of the service to the users were made. These measures were studied together to lay…
ERIC Educational Resources Information Center
Stremel, Kathleen
This final report discusses the activities and outcomes of a project designed to assist states in improving the quality of existing placements and services for individuals (birth through young adulthood) who are deaf-blind, and to increase the number of children, their families, and their service providers who will benefit from these services. The…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.
An evaluation was done of the New York City Public Schools' Student Upgrading through Computer and Career Education Systems Services Program (Project SUCCESS). Project SUCCESS operated at 3 high schools in Brooklyn and Manhattan (Murry Bergtraum High School, Edward R. Murrow High School, and John Dewey High School). It enrolled limited English…
Evaluation of Title I ESEA Projects, 1971-1972. Volume IV, Auxiliary Services to Schools and Pupils.
ERIC Educational Resources Information Center
Chern, Hermine J.; And Others
This final volume of reports on the evaluation of ESEA Title I projects in Philadelphia 1971-1972 is concerned with the cluster "Auxiliary Services to Schools and Pupils." In this report are examined the theoretical bases for the creation and integration of projects directed toward the broad-based career development goals of the School…
ERIC Educational Resources Information Center
Pittsburgh Univ., PA. Div. of Teacher Development.
To provide materials for a national exchange program and a Pennsylvania activities bank, a project was designed to produce materials for teacher-coordinators of high school distributive education. The project objectives were to (1) review and evaluate competencies necessary for advertising service careers, (2) develop activities and evaluative…
Specialized Vocational Training Program Development. Final Report.
ERIC Educational Resources Information Center
Henry, Joan
The final report of the Bristol Township School District (Pennsylvania) training program for the educable mentally retarded presents instructional units for the areas of preschool education, child care, shipping and receiving, maintenance and food services. It is explained that the project uses school service personnel to supervise students in…
Youth Monitoring and Self-Evaluation Services. Final Report.
ERIC Educational Resources Information Center
Fenton, Calvin W.
Youth monitoring and self evaluation services were developed for fourteen youth programs in the Eastern Region, the mid-Western Region and the Western Region of the United States. The concept of youth involvement is central to these fourteen projects. Youth involvement is defined as "initial participation by project beneficiaries in the…
ERIC Educational Resources Information Center
MacCabe, Bruce
The Literacy Learning Center Project, a project of the Meriden Public Library (Connecticut), targeted the educationally underserved and functionally illiterate, and involved recruitment, retention, space renovation, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer assisted services, and…
ERIC Educational Resources Information Center
Occupational Outlook Quarterly, 2010
2010-01-01
The economy's need for workers originates in the demand for the goods and services that they provide. So, to project employment, the Bureau of Labor Statistics (BLS) starts by projecting the gross domestic product (GDP) for 2018. GDP is the value of the final goods produced and services provided in the United States. Then, BLS estimates the…
Bilingual Human Services Educational Consortium. Final Report.
ERIC Educational Resources Information Center
Maine Univ., Orono. Bangor Community Coll.
This report presents results of the third year of a project designed to enhance employability and career mobility of limited English speaking Franco-American adults in jobs providing services for the elderly. The first section states project objectives of the college-level, credit-bearing program conducted at five university campuses: (1) to…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
... DEPARTMENT OF AGRICULTURE Rural Utilities Service Dairyland Power Cooperative: CapX 2020 Hampton-Rochester-La Crosse Transmission Line Project AGENCY: Rural Utilities Service, USDA. ACTION: Notice of Availability of a Final Environmental Impact Statement. SUMMARY: Notice is hereby given that the Rural...
ERIC Educational Resources Information Center
Des Enfants, Sherry
This DeKalb County Public Library family literacy project final performance report begins with a section that provides quantitative data on the project. The next section compares actual accomplishments to the following project objectives for fiscal year 1993: (1) to update eight existing literacy collections in branch libraries by the addition of…
DOT National Transportation Integrated Search
2013-02-27
SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...
ERIC Educational Resources Information Center
Steffenberg, Mary L.
A Food Service Laboratory Project was initiated at a junior high school for the training, participation, and observation of educable mentally retarded (EMR) students. Thirty EMRs participated in the vocational training program, the academic portion of which was work-oriented and closely related to the work in the Food Service Laboratory. Students,…
ERIC Educational Resources Information Center
Bailey, Charles W., Jr.
This report on a funded project that established a chemistry research information service for researchers in the University of Houston's chemistry department provides detailed descriptions of the three objectives of the project, together with an explanation of how each objective was/is to be accomplished. These objectives were/are: (1) to document…
ERIC Educational Resources Information Center
Rosynek, Joy
This final performance report provides project outcome information and data to the U.S. Department of Education for the federally-funded Library Literacy Program. The Jackson District Library (Michigan) conducted a project that involved recruitment, retention, public awareness, training, basic literacy, collection development, tutoring, employment…
Project CREATE Final Report. Cooperative Resources To Enhance Access to Technology Education.
ERIC Educational Resources Information Center
Hampden County Employment and Training Consortium, Springfield, MA.
These materials have been developed by Project CREATE (Cooperative Resources to Enhance Access to Jobs through Technical Education), a demonstration program designed to develop a network, specific activities, and resources that would provide education and support services to a wide audience. A 13-page final report describes the hands-on training…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
...) Number: 84.250C and 84.250D] Final Waivers and Extensions of Project Periods; American Indian Vocational... assistance in order to provide vocational rehabilitation services to American Indians with disabilities... program is funded through a set-aside of the funds appropriated for the Vocational Rehabilitation (VR...
School Age Multihandicapped Project: Capital Area Rehabilitation Center. Final Report 1977-1980.
ERIC Educational Resources Information Center
Capital Area Rehabilitation Center, Austin, TX.
The document contains the final report of a model project to provide a therapeutically based educational program for severely handicapped, orthopedically impaired children (6 to 21 years old) utilizing the skills of teachers, aides, therapists, and a nurse to provide individualized hands on services. Section I contains an overview of the…
Career Preparation: A Curriculum in Mental Health and Aging for Service Providers. Final Report.
ERIC Educational Resources Information Center
Rich, Thomas A.; And Others
This document contains a final report of a project which developed a model multidisciplinary graduate curriculum in mental health and aging. The introductory chapter, "Career Preparation: A Curriculum in Mental Health and Aging for Service Providers" (Thomas A. Rich, et al.), includes background information and discussions of the curriculum…
ERIC Educational Resources Information Center
Stremel, Kathleen; Wilson, Rebecca
This final report describes a federally funded 3-year project for integrating related services within educational objectives for children (ages 3-10) with dual vision and hearing impairments. A Training-Utilization model of inservice training and technical assistance was developed, implemented, and evaluated to address the communication needs of…
Final Report for DOE Project: Portal Web Services: Support of DOE SciDAC Collaboratories
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mary Thomas, PI; Geoffrey Fox, Co-PI; Gannon, D
2007-10-01
Grid portals provide the scientific community with familiar and simplified interfaces to the Grid and Grid services, and it is important to deploy grid portals onto the SciDAC grids and collaboratories. The goal of this project is the research, development and deployment of interoperable portal and web services that can be used on SciDAC National Collaboratory grids. This project has four primary task areas: development of portal systems; management of data collections; DOE science application integration; and development of web and grid services in support of the above activities.
ERIC Educational Resources Information Center
Mallik, Kalisankar; Shaver, Elaine M.
The final report of a 3 year project to improve the quality of life of mentally retarded, cerebral palsied, and epileptic persons in Region III is presented. The first section details the efforts of the project staff in providing competitive employment opportunities or sheltered employment for 40 severely disabled persons. Equipment modification…
ERIC Educational Resources Information Center
Knoll, James A.; Bedford, Sara
The project sought to determine the content and form of materials that would enable parents of children with disabilities to become informed critical consumers of respite services. Project activities included establishment and utilization of a national advisory panel; an indepth review of the literature on family supports, systems change, and…
ERIC Educational Resources Information Center
Carlson, Lawrence O.
The project, intended to design and field test models of specialized library services for older adults, was conducted in two parts. Phase 1 consisted of collecting and evaluating data for use in designing models in Louisville, Lexington, Somerset, and Hazard, Kentucky. Data was collected by search of the literature, personal interviews, a…
ERIC Educational Resources Information Center
Olsen, Jan Kennedy; And Others
This paper reports a self-study undertaken at Cornell University's Albert R. Mann Library to explore appropriate public services for an agricultural research faculty. The study took place over a 22-month period and involved a literature review, development of a questionnaire, administration of the questionnaire, an experimental period of…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-11
... DEPARTMENT OF AGRICULTURE Forest Service Beaver Creek Landscape Management Project, Ashland Ranger... Impact Statement for the Beaver Creek Landscape Management Project was published in the Federal Register... Responsible Official for the Beaver Creek Landscape Management Project. DATES: The Final Environmental Impact...
ERIC Educational Resources Information Center
Smith, Barbara J.
This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…
Penetrating School Strata through Career Education. Final Report.
ERIC Educational Resources Information Center
Nolan, Richard D.
This is a final report of a 3-year project to modify the curriculum in the Bristol, Connecticut, school system by infusing career education concepts and practices into all subjects at all grade levels. The report includes a description of the four components of the project: Grades K-8, grades 9-12, development of job placement services, and…
ERIC Educational Resources Information Center
Wozniak, Jacci
The Eisenhower Pre-Service Teacher Education Project was developed by the University of Central Florida, the five community colleges in Region III of the Higher Education Consortium, and the private college and universities in the same region to design curriculum changes to improve the preparation of elementary and secondary math and science…
Warrants, design, and safety of road ranger service patrols : draft final report.
DOT National Transportation Integrated Search
2016-11-01
This research project created a decision support system for managers who must decide if a roadway warrants the addition of the Safety Service Patrol (SSP). Meetings with Florida Department of Transportation (FDOT) service patrol program manager...
ERIC Educational Resources Information Center
Holtslander, Linda
This final performance report for the Loudoun County Public Library literacy project begins with a section that provides quantitative data. The next section compares actual accomplishments to the major project objective: to create a non-threatening learning environment at the Transitional Housing Center (THC), a residential homeless shelter.…
ERIC Educational Resources Information Center
Drake, Karen; Rodriguez, Leonard
This final performance report for the Chandler Public Library literacy project for fiscal year 1992 begins with a section that provides quantitative data. The next section compares actual accomplishments to the project goal--to improve the quality of life for illiterate, semiliterate, and non-English-speaking citizens by providing a comprehensive…
Staff and Program Development for a New Pupil Personnel Services Professional: Final Report 1.
ERIC Educational Resources Information Center
Ruch, Charles P.
This is the first in a series of final reports to the Office of Education on the Northeastern EPDA/PPS Center-Satellite Project. This multi-year, multi-institutional project was an attempt to redesign the training of pupil personnel specialists for the schools through preservice training for entry-level personnel and pre- or inservice training for…
ERIC Educational Resources Information Center
Brown, DiAnn; Gaar, Sara J.
This final report describes activities and accomplishments of Alaska's 3-year program on services for children and youth with dual sensory impairments. The project provided technical assistance to local education agencies, infant learning programs, and other educators. It also provided support and training to families of children with…
Final Technical Report- Virginia Solar Pathways Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bond, Katharine; Cosby, Sarah
This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments.
75 FR 18235 - Paiute Cutthroat Trout Restoration Project, Alpine County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-09
...] Paiute Cutthroat Trout Restoration Project, Alpine County, CA AGENCY: Fish and Wildlife Service, Interior... availability of the Paiute Cutthroat Trout Restoration Project Final Environmental Impact Statement (EIS... cutthroat trout to the species historical range within the Silver King Creek watershed, Alpine County...
ERIC Educational Resources Information Center
Protection and Advocacy, Inc., Sacramento, CA.
In 1982, Protection and Advocacy, Inc. (PAI) was awarded funds to provide advocacy services to Hispanic and Asian developmentally disabled persons residing in California. Initial target populations selected were the urban Korean, Vietnamese, and Hispanic communities of Los Angeles. The project's goals were (1) to provide training in self-advocacy…
Project A.B.C. Bronx Academic Bilingual Career Program, 1982-1983. O.E.E. Evaluation Report.
ERIC Educational Resources Information Center
DiMartino, Vincent James; Schulman, Robert
This multi-site program, in its final year of a two-year funding cycle, provided special resources and supportive services to approximately 200 recently arrived students of limited English proficiency in grades 9-12 at three Bronx (New York) high schools. The project served Vietnamese (Chinese ethnics), Italians, and Hispanics. Services provided…
ERIC Educational Resources Information Center
Fairchild, Charles K.
The objective of the project was to develop methods for establishing output and input performance standards for the placement and placement support functions of the United States Employment Service (ES). This part of Volume 2 reports substantive findings and recommendations developed during the course of the project. A key recommendation is that…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... NUCLEAR REGULATORY COMMISSION [DOCKET NO. 52-016; NRC-2008-0250] Calvert Cliffs 3 Nuclear Project, LLC and Unistar Nuclear Operating Services, LLC; Notice of Availability of the Final Environmental Impact Statement for the Combined License Application for Calvert Cliffs Nuclear Power Plant Unit 3 Notice is hereby given that the U.S. Nuclear...
ERIC Educational Resources Information Center
Specktor, Peggy; Stafford, Rick, Ed.
The Minnesota Program for Victims of Sexual Assault conducted a 9-month training program for racial minority human service professionals from September 1983 through May 1984. The objectives of the project were to improve the identification, intervention, and treatment of sexual assault victims and their families. The project targeted Blacks,…
ERIC Educational Resources Information Center
Elton, Martin C. J.; Carey, John
Intended primarily for use by individuals about to assume responsibility for the implementation of field trials and demonstration projects built around interactive telecommunication systems, this report provides brief descriptions of 20 telemedicine projects, 12 teleconferencing projects, and seven involving two-way applications of cable…
42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?
Code of Federal Regulations, 2010 CFR
2010-10-01
... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...
Cleveland Neighborhood Elderly Transportation Demonstration Project
DOT National Transportation Integrated Search
1977-04-01
The document is a final evaluation report of the Cleveland Neighborhood Elderly Transportation (NET) System. The Cleveland NET Project was implemented in March 1975 with the purpose of providing personalized door-to-door transportation services for e...
Ecosystem Goods & Services and their Direct Linkages to Human Health & Well-Being
This presentation provides an overview of the SHC 2.61 Community-Based Final Ecosystem Goods and Services Project and other ecosystem services activities in the Office of Research and Development. Specifically, this presentation addressed a series of topics: Provide an overview ...
Comprehensive Evaluation Project. Final Report.
ERIC Educational Resources Information Center
1969
This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…
Computer Concepts for VTAE Food Service. Final Report.
ERIC Educational Resources Information Center
Wisconsin Univ. - Stout, Menomonie. Center for Vocational, Technical and Adult Education.
A project was conducted to determine the computer application competencies needed by a graduate of Wisconsin Vocational Technical Adult Education (VTAE) food service programs. Surveys were conducted of food service graduates and their employers as well as of major companies by the food service coordinators of the VTAE districts in the state; a…
Project Report, Part One, Final Report for Phase I, Rural Shared Services.
ERIC Educational Resources Information Center
Northern Montana Coll., Havre.
In an attempt to identify, synthesize, and evaluate shared services research and development efforts conducted throughout the nation, and bring those results together in a single report, Part One of a four-part report defines rural shared services and the organizational patterns under which shared service activity exists, describes the activities…
ERIC Educational Resources Information Center
McNulty, Tom, Ed.
1995-01-01
This final installment of a four-part series on the National Library Service (NLS) examines recently implemented and future projects, with a focus on alternative formats for patrons with disabilities. Discusses LOCIS, the Library of Congress online public access catalog; MARVEL, the Library of Congress gopher; the NLS Web site; and computer disk…
ERIC Educational Resources Information Center
Dennis-Small, Lucretia
Conducted by the Texas Department of Human Services (DHS), Project Amistad (Friendship) originally set out to recruit and train Black and Hispanic volunteers to conduct lay therapy sessions with Black and Hispanic families in which abuse and neglect of children had occurred. Start-up was significantly delayed due to personnel changes; as a result,…
75 FR 27982 - Fremont and Winema Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... management projects for funding in FY 2011, under the provisions of Title II of the Secure Rural Schools and...: The agenda will include a review of FY 2011 Title II project proposals submitted by the Forest Service, the public, non-profits and other agencies, presentations by project proponents, and final...
Well Elderly Integrated Training Project. Final Report.
ERIC Educational Resources Information Center
Summit-Portage Area Health Education Network, Akron, OH.
The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…
Project D. E. A. F. Final Report.
ERIC Educational Resources Information Center
Hairston, Ernest E.
Project D.E.A.F., its introduction and background, purpose, clientele, methodology, and activities, are described. Project D.E.A.F. was established by an expansion grant from the Rehabilitation Service Administration of the Department of Health, Education and Welfare, in cooperation with the Ohio Bureau of Vocational Rehabilitation for the purpose…
Effective Vocational Training Procedures for EMR Students. Final Report.
ERIC Educational Resources Information Center
Carter, Robert
A project was conducted to train Jefferson County, Alabama, vocational education instructors in effective teaching techniques and to develop appropriate instructional procedures for educable mentally retarded students. Vocational education areas included in the project were welding, food service, and brick masonry. The project was conducted in two…
Project EXCEL. Final Performance Report, March 1, 1991-October 31, 1992.
ERIC Educational Resources Information Center
Career Resources Development Center, Inc., San Francisco, CA.
Project EXCEL is a workplace literacy project involving four small business enterprises in San Francisco. Over a 19-month period, the project focused on literacy and basic skills training for 271 limited-English-proficient (LEP) workers. All training was conducted at the work sites, and a variety of support services were provided, including…
Maryland Family Support Services Consortium. Final Report.
ERIC Educational Resources Information Center
Gardner, James F.; Markowitz, Ricka Keeney
The Maryland Family Support Services Consortium is a 3-year demonstration project which developed unique family support models at five sites serving the needs of families with a developmentally disabled child (ages birth to 21). Caseworkers provided direct intensive services to 224 families over the 3-year period, including counseling, liaison and…
Identifying Competencies in the Food Service Industry. Final Report.
ERIC Educational Resources Information Center
Wagner, Linda M.
This report documents a research project conducted to ascertain what specific occupational competencies are necessary for employees in the food service industry. Questionnaires were mailed to employers, in restaurants and hospitals and to graduates of high school and postsecondary food service programs. The respondents completed 316 position…
Electric vehicle charging technologies analysis and standards : final research project report.
DOT National Transportation Integrated Search
2017-02-01
This project has evaluated the technologies and standards associated with Electric : Vehicle Service Equipment (EVSE) and the related infrastructure, and the major cost : issue related to electric vehicle (EV) charging -- the cost of utility power. T...
Commercialization of PV-powered pumping systems for use in utility PV service programs. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-03-01
The project described in this report was a commercialization effort focused on cost-effective remote water pumping systems for use in utility-based photovoltaic (PV) service programs. The project combined a commercialization strategy tailored specifically for electric utilities with the development of a PV-powered pumping system that operates conventional ac pumps rather than relying on the more expensive and less reliable PV pumps on the market. By combining these two attributes, a project goal was established of creating sustained utility purchases of 250 PV-powered water pumping systems per year. The results of each of these tasks are presented in two parts containedmore » in this Final Summary Report. The first part summarizes the results of the Photovoltaic Services Network (PSN) as a new business venture, while the second part summarizes the results of the Golden Photon system installations. Specifically, results and photographs from each of the system installations are presented in this latter part.« less
ERIC Educational Resources Information Center
Stead, Sharon
This final performance report for the Lewistown City Library L.E.A.R.N. (Let Every Adult Read Now!) literacy project begins with a section that provides quantitative data. The next section compares actual accomplishments to the following project goals for 1992-93: to serve a minimum of 25 adult literacy students within an 18-month period and to…
ERIC Educational Resources Information Center
Markuson, Barbara Evans
This report results from a project using the OCLC system to provide catalog services to small libraries. Alternatives described include: centralized cataloging, centralized book processing, sharing of OCLC terminals, and use of dial-up terminals. The OCLC data base was found useful for all types of small libraries. It is recommended that network…
CleanFleet final report. Volume 2, project design and implementation
DOT National Transportation Integrated Search
1995-12-01
The South Coast Alternative Fuels Demonstration, called CleanFleet, was conducted in the Los Angeles area from April 1992 through September 1994. The project evaluated five alternative motor fuels in commercial fleet service over a two-year period. T...
Placement Component, Lincoln Career Education Project. Final Report. March, 1973-June, 1976.
ERIC Educational Resources Information Center
Novak, Carl D.; And Others
The goal of the placement component of the 3-year Lincoln Career Education Project, Nebraska, was to establish placement services for youth of participating project schools. "Placement" referred not only to helping exiting senior high youth find employment, but also to developing the knowledge, skills, and attitudes which lead to…
This report documents the activities performed and the results obtained from the arsenic removal treatment technology demonstration project in Brown City, MI. The objectives of the project were to evaluate (1) the effectiveness of a Severn Trent Services (STS) adsorptive media s...
Motivation for Reading Improvement. Final Project Report.
ERIC Educational Resources Information Center
Kit Carson Union Elementary School District, Hanford, CA.
This document reports on a project aimed at motivating students to develop attitudes that learning can be fun and that it can benefit them, and at discouraging students from working just to please the teacher. The project involved the use of a "News Laboratory," which included a United Press International wire service, various…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-13
..., maintenance, and decommissioning of the Beech Ridge Wind Power Project. Beech Ridge Energy is requesting a 25... of 67 existing turbines in the project area; the construction, operation, and maintenance of up to 33... Wind Power Project, Greenbrier and Nicholas Counties, West Virginia AGENCY: Fish and Wildlife Service...
ERIC Educational Resources Information Center
Himes, John H.; And Others
The Lawrence (Massachusetts) Children's Health Project (LCHP) was a demonstration project consisting of an alternative approach to providing health care to children, many of whom were not receiving health services. The project was carried out by the Merrimack Education Center and focused on a school-based model for Early Periodic Screening,…
ERIC Educational Resources Information Center
Gittman, Elizabeth; Gottlieb, Karen
Support for Innovative Teacher Projects was a 12-month program implemented by the Board of Cooperative Education Services (BOCES) of Nassau County, New York, designed to encourage and assist teachers in developing innovative projects in priority areas and in applying for funding. In collaboration with a university school of education, the project…
ERIC Educational Resources Information Center
Koontz, Christine; Jue, Dean K.; Lance, Keith Curry
This document is the final performance report for a Field Initiated Studies (FIS) project that addressed the need for a better assessment of public library services for adult lifelong learning in majority-minority and lower income library market areas. After stating the major educational problem addressed by the FIS project, the report lists the…
ERIC Educational Resources Information Center
1974
Presented is the final report of the Learning Disability Fail-Save Continuum Project, designed to provide identification, assessment, and placement services to 378 elementary and secondary level students. Outlined in Section I are the following project components: major revisions from the original proposal (such as implementation of the itinerant…
Development of a process for quantifying the benefits of research : final report.
DOT National Transportation Integrated Search
2017-07-04
MnDOT Research Services funds and administers approximately 180 transportation research projects annually at a cost of slightly more than $3 million. This project developed an easy-to-apply process for quantifying the potential benefits of research a...
Civil engineering support for the traffic monitoring program : final report, January 2010.
DOT National Transportation Integrated Search
2010-01-01
This project was aimed at providing various civil engineering support services for the telemetered traffic monitoring sites operated by the Statistics Office of the Florida Department of Transportation. This was a companion project to the one that pr...
Bridge maintenance Program for the City of Columbia, Missouri : final report.
DOT National Transportation Integrated Search
2017-09-22
The goal of this project was to extend the service lives of bridges located in Columbia, Missouri. The objective of the project was to develop guidelines for bridge maintenance and preservation. The guidelines developed are focused on practical and i...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-07
... Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects... Rehabilitative Services announces a priority under the Disability Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR...
1991-10-01
of the Chief of Engineers, such work is advisable. The study was requested by the Washington State Department of Transportation, Marine Division... Marine Division (Washington State Ferries) 31 b. National Marine Fisheries Service 31 c. U.S. Fish and Wildlife Service 32 d. U.S. Environmental Protection...accomplished by the local sponsor through a WDOT, Marine Division, 1991-92 biennium budget request for deepening Keystone Harbor. Assuming WDOT
Grid-Scale Energy Storage Demonstration of Ancillary Services Using the UltraBattery Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seasholtz, Jeff
2015-08-20
The collaboration described in this document is being done as part of a cooperative research agreement under the Department of Energy’s Smart Grid Demonstration Program. This document represents the Final Technical Performance Report, from July 2012 through April 2015, for the East Penn Manufacturing Smart Grid Program demonstration project. This Smart Grid Demonstration project demonstrates Distributed Energy Storage for Grid Support, in particular the economic and technical viability of a grid-scale, advanced energy storage system using UltraBattery ® technology for frequency regulation ancillary services and demand management services. This project entailed the construction of a dedicated facility on the Eastmore » Penn campus in Lyon Station, PA that is being used as a working demonstration to provide regulation ancillary services to PJM and demand management services to Metropolitan Edison (Met-Ed).« less
ERIC Educational Resources Information Center
McClure, Charles R.; And Others
This report presents a summary of activities, findings, and recommendations from Phase I of a project to improve the effectiveness of academic health science libraries and their provision of information services. The objectives for Phase I of the project are given: (1) to identify academic health science library requirements in the areas of…
ERIC Educational Resources Information Center
Mooney, Sharon Lopez
The West Marin Literacy Project, a project of the Marin County Free Library (San Rafael, California), involved recruitment, retention, coalition building, public awareness, training, rural oriented, tutoring, computer- assisted, intergenerational/family, and English as a Second Language (ESL) programs. The project served a community of under…
Problems in Bibliographic Access to Non-Print Materials. Project Media Base: Final Report.
ERIC Educational Resources Information Center
Brong, Gerald; And Others
Project Media Base reports its conclusions and recommendations for the establishment of bibliographic control of audiovisual resources as a part of an overall objective to plan, develop, and implement a nationwide network of library and information services. The purpose of this project was to test the hypothesis that the essential elements of a…
Work Analysis Specialist Project. Final Report. Project Number 325-81-111-2.
ERIC Educational Resources Information Center
Gordon, Donald M.
This project was conducted in New Castle (Henry County), Indiana to train and use the services of a work analysis specialist who would work with manufacturing companies to improve company profits through the provision of training programs based on a specific needs assessment. The determination of specific needs was accomplished through the…
Good Citizens through Literacy Network. A 353 Project Final Report.
ERIC Educational Resources Information Center
Leto, Lyn
An adult basic education (ABE) class was developed to help parolees of the Schuylkill County Prison develop reading, writing, and communication skills and use those skills in a community service project aimed at helping at-risk youth. Parolees were recruited into the project through county parole officers, and their reading, writing, self-esteem,…
The UIC Therapeutic Partnership Project. Final Report.
ERIC Educational Resources Information Center
Lawlor, Mary C.; Cada, Elizabeth A.
This interdisciplinary inservice training project at the University of Illinois at Chicago was designed to improve early childhood occupational and physical therapy services by developing, implementing, evaluating, and disseminating a comprehensive training model. The competency-based program was designed to address the developmental needs of…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... Information; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and... notice of final priorities for the Disability and Rehabilitation Research Projects and Centers program... priority for the Disability and Rehabilitation Research Projects and Centers Program, published elsewhere...
ERIC Educational Resources Information Center
Powers, Thomas F., Ed.; Swinton, John R., Ed.
Volume II of a three-volume study on the future of the food service industry considers the effects that centralized food production will have on the future of food production systems. Based on information from the Fair Acres Project and the Michigan State University Vegetable Processing Center, the authors describe the operations of a centralized…
AXIS: Adult Education eXpress Intercommunication Support. Final Report.
ERIC Educational Resources Information Center
Reiff, Tana
This package includes the final report and selected products of the Adult education eXpress Intercommunication Support (AXIS) project, which was conducted to facilitate communication related to professional development services administered by the Pennsylvania Department of Education's Bureau of Adult Basic and Literacy Education (ABLE) and…
E-service learning: A pedagogic innovation for healthcare management education.
Malvey, Donna M; Hamby, Eileen F; Fottler, Myron D
2006-01-01
This paper proposes an innovation in service learning that we identify as e-service learning. By adding the "e" to service learning, we create a service learning model that is dynamic, mediated by technology, and delivered online. This paper begins by examining service learning, which is a distinct learning concept. Service learning furnishes students with opportunities for applied learning through participation in projects and activities in community organizations. The authors then define and conceptualize e-service learning, including the anticipated outcomes of implementation such as enhanced access, quality, and cost effectiveness of healthcare management education. Because e-service learning is mediated by technology, we identify state of the art technologies that support e-service learning activities. In addition, possible e-service learning projects and activities that may be included in healthcare management courses such as finance, human resources, quality, service management/marketing and strategy are identified. Finally, opportunities for future research are suggested.
Language Integrated Technology Project Final Evaluation Report.
ERIC Educational Resources Information Center
Stiegemeier, Lois
The goal of the Language Integrated Technology Grant Project (LIT) consortium was to help provide critical components of successful reading programs through a combination of proven computer/print programs and teacher training. Through leadership provided by the Educational Service District 113 (Olympia, Washington), the LIT consortium of schools…
78 FR 2655 - Uinta-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
...-Wasatch-Cache National Forest; Utah; Ogden Travel Plan Project AGENCY: Forest Service, USDA. ACTION... prepare a supplement to the Ogden Travel Plan Revision Final Supplemental Environmental Impact Statement (FSEIS). The Ogden Travel Plan Revision FSEIS evaluated six alternatives for possible travel management...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-09
... individuals with disabilities in conducting TBIMS research. Types of Priorities When inviting applications for... Rehabilitation Research--Traumatic Brain Injury Model Systems Centers Collaborative Research Project AGENCY... Services announces a priority for the Disability and Rehabilitation Research Projects and Centers Program...
The mentally ill in jails and prisons: towards an integrated model of prevention.
Lamberti, J S; Weisman, R L; Schwarzkopf, S B; Price, N; Ashton, R M; Trompeter, J
2001-01-01
Jails and prisons have become a final destination for persons with severe mental illness in America. Addiction, homelessness, and fragmentation of services have contributed to the problem, and have underscored the need for new models of service delivery. Project Link is a university-led consortium of five community agencies in Monroe County, New York that spans healthcare, social service and criminal justice systems. The program features a mobile treatment team with a forensic psychiatrist, a dual diagnosis treatment residence, and culturally competent staff. This paper discusses the importance of service integration in preventing jail and hospital recidivism, and describes steps that Project Link has taken towards integrating healthcare, criminal justice, and social services. Results from a preliminary evaluation suggest that Project Link may be effective in reducing recidivism and in improving community adjustment among severely mentally ill patients with histories of arrest and incarceration.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... DEPARTMENT OF EDUCATION [CFDA No. 84.326T] National Technical Assistance and Dissemination Center for Children Who Are Deaf-Blind; Final Extension of Project Period and Waiver AGENCY: Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of...
Long Island Workplace Literacy Program. Final Performance Report and Final Evaluation Report.
ERIC Educational Resources Information Center
Silverman, Gene; And Others
The Long Island Workplace Literacy Partnership was established to provide workplace literacy programs for adult workers with inadequate reading, mathematics, communication, English language, and decision-making skills. Four corporations cooperated with the Board of Cooperative Educational Services of Nassau County in the project. The service…
TADS Final Evaluation Report, 1980-81. Appendix S.
ERIC Educational Resources Information Center
Suarez, Tanya M.; And Others
The document contains the final report of the Technical Assistance Development System (TADS), a program which provided technical assistance (TA) services to 53 Handicapped Children's Early Education Program (HCEEP) demonstration projects and 13 State Implementation Grants (SIGs). The evaluation report is divided into five sections. Section 1…
Project LEEWAY for Single Parents. PY95 Final Detailed Report.
ERIC Educational Resources Information Center
Lee Coll., Baytown, TX.
Project LEEWAY was implemented in July 1992 at Lee College, in Texas, to recruit low-income, academically disadvantaged single parents, displaced homemakers, and single pregnant women into nontraditional technical programs and provide necessary support services to ensure success. This report describes the implementation, components, and results of…
Bilingual Adult Basic Education Project. Final Report.
ERIC Educational Resources Information Center
Graham, Janet Roth
The Bilingual Adult Basic Education Project provided bilingual life skills instruction, counseling, and informational services to approximately 150 non-English-dominant adults across Pennsylvania by means of contracts to local education agencies. Students were pre- and post-tested in English and/or their native language to measure their growth in…
Evaluation of the Attendant Care Pilot Project. Final Report.
ERIC Educational Resources Information Center
Clark, Anne; Faragher, Jean
An Attendant Care Pilot Project, administered by the Home Care Service of New South Wales, Australia, and providing attendant care for 24 permanently severely physically disabled adults for 2 years, was evaluated. The patients were medically stable and intellectually capable of managing their own affairs; all had impairments which required…
Skills Conversion Project, Chapter 8, Pollution Control. Final Report.
ERIC Educational Resources Information Center
National Society of Professional Engineers, Washington, DC.
The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…
National Project III, Elevating the Importance of Teaching. Fund Associate's Final Report.
ERIC Educational Resources Information Center
Seibert, Warren F.
Purdue University's participation as a fund associate in National Project III (NP III) for elevating the importance of teaching has its origins in a flexible and diagnostic instructional evaluation system called "CAFETERIA." CAFETERIA services include test development, scoring, and analysis; social surveys on topics of importance in…
FAST DASH: Safety Technology Evaluation Project #1 – Blindspot Warning, 2012
DOT National Transportation Integrated Search
2014-01-01
The objective of this research project was to examine the efficacy of the new restart rule promulgated as part of the Hours of Service of Drivers Final Rule, published on December 27, 2011, with a compliance date of July 1, 2013. Under the new restar...
Vocational Cooking Class. Final Report.
ERIC Educational Resources Information Center
Morton, Kathy M.
A project was conducted to develop a course in cooking skills for high school students interested in preparing for jobs or seeking advanced vocational training in the food service occupations. During the first phase of the project, the course instructor, who is also the head cook at the high school, completed courses in cardiopulmonary…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
... and Rehabilitation Research (NIDRR)--Disability Rehabilitation Research Project (DRRP)--Disability in... Rehabilitative Services announces a funding priority for the Disability and Rehabilitation Research Projects and...) 2011 and later years. We take this action to focus research attention on areas of national need. We...
77 FR 56179 - Humboldt (NV) Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-12
... committee is authorized under the Secure Rural Schools and Community Self-Determination Act (Pub. L. 112-141... Service concerning projects and funding consistent with the title II of the Act. The purpose of the meeting is to complete any final business needed to recommend projects to the Humboldt-Toiyabe Forest...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... Wildlife Service, on the strategic direction and management of the NMBCA program. Proposal due dates... Avenue L'Auberge, Lake Charles, LA 70601. FOR FURTHER INFORMATION CONTACT: Michael J. Johnson, Council... management projects for recommendation to, and final funding approval by, the Commission. Project proposal...
People Management. Final Report of the People Management Committee
1975-04-25
Objective Memorandum Planning, Programming, C Budgeting System Personnel Priority Model Projected Requisitioning Authority Prior ServIce Quality ...April 1975 PREPARED FOR - G THE DEPARTMENT OF ARMY OFFICE OF THE DEPUTY CHIEF OF STAFF FOR PERSONNEL NATIONAL TECHNICAL INFORMATION SERVICE US... service accessions and reenllstees. (3) Manage the DEP. (4) Bolster systems discipline. d. RecommendetIons; (1) That manpower objectives
78 FR 25524 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
... assigned, and Caltrans assumed environmental responsibilities for this project pursuant to 23 U.S.C. 327... Service (USFWS), Environmental Protection Agency (EPA) and the Natural Resource Conservation Service (NRCS... FURTHER INFORMATION CONTACT: For Caltrans: G. William ``Trais'' Norris III, Senior Environmental Planner...
Field Study on the Efficacy of the New Restart Provision for Hours of Service
DOT National Transportation Integrated Search
2014-01-01
The objective of this research project was to examine the efficacy of the new restart rule promulgated as partof the Hours of Service of Drivers Final Rule, published on December 27, 2011, with a compliance date of July 1, 2013. Under the new restart...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-14
... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... Transition Technical Assistance Center (NSTTAC). Currently, the Office of Special Education Programs (OSEP...
ERIC Educational Resources Information Center
Occupational Outlook Quarterly, 2012
2012-01-01
The economy's need for workers originates in the demand for the goods and services that these workers provide. So, to project employment, BLS starts by estimating the components of gross domestic product (GDP) for 2020. GDP is the value of the final goods produced and services provided in the United States. Then, BLS estimates the size--in…
Child Services Demonstration Center Evaluation. Summary Report. (ESEA VI-G).
ERIC Educational Resources Information Center
Colorado State Dept. of Education, Denver.
Presented is the final report of Colorado's Child Services Demonstration Project, designed to develop, implement, and evaluate a team staffing program to aid children with specific learning disabilities. The program is described in terms of rationale, replication, children served, staff activities (educational diagnosis, prescriptive programing,…
NASA Hubble Space Telescope (HST) Research Project Capstone Even
2014-05-05
John Grunsfeld, NASA Associate Administrator for the Science Mission Directorate, speaks to students from Mapletown Jr/Sr High School and Margaret Bell Middle School about his experiences on the final space shuttle servicing mission to the Hubble Space Telescope during the NASA Hubble Space Telescope (HST) Research Project Capstone Event in the James E. Webb Auditorium at NASA Headquarters on Monday, May 5, 2014. Grunsfeld flew on three of the five servicing missions to the Hubble Space Telescope. Photo Credit: (NASA/Joel Kowsky)
ERIC Educational Resources Information Center
United States Conference of Mayors, Washington, DC.
"If we can put a man on the moon, why can't we solve the problems of our cities?" The demand for urban services and the manpower needs of local governments were increasing dramatically. Skilled professional personnel were unemployed. The Aerospace Employment Project was set up as a special pilot project to test whether unemployed professional…
ERIC Educational Resources Information Center
Johanson, Joyce; Bell, Carol; Daytner, Katrina
2008-01-01
Funded by the U.S. Department of Education's Office of Special Education Programs (OSEP), LitTECH Outreach was a 3-year technology-based preschool literacy project conducted by staff at the Center for Best Practices in Early Childhood, a research and development division of the College of Education and Human Services at Western Illinois…
Career Awareness Program. Project CAP. 1989-90. Final Evaluation Report. OREA Report.
ERIC Educational Resources Information Center
Zhang, Hong
An evaluation of the fourth year of funding of the Career Awareness Program (Project CAP) by Title VII of the Elementary and Secondary Education Act is presented. Project CAP provided instruction and support services to Chinese-speaking students (n=285), grades 5 through 9, at 2 intermediate schools in New York City, I.S. 73 in Queens and I.S. 131…
Educational Information System for Ontario. Final Report, March 1977-April 1978.
ERIC Educational Resources Information Center
Auster, Ethel; Lawton, Stephen B.
This final report describing the operation and research of the EISO project, which provides online bibliographic search services to educators of Ontario, briefly summarizes the first and second interim reports. In addition, it discusses users and the uses of EISO information by providing mini-case studies to illustrate quantitative data and…
Skills Conversion Project: Chapter 3, Food Products and Food Services Industry. Final Report.
ERIC Educational Resources Information Center
National Society of Professional Engineers, Washington, DC.
The National Society of Professional Engineers, under contract to the Department of Labor, conducted a study to investigate the conversion of technical skills of displaced aerospace and defense professionals to other industries. The Seattle and Wichita study teams, focusing on the food industry, projected that about 200 employment opportunities…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-21
... Deadline for Submission of Final Amendments; Monadnock Paper Mills, Inc. Take notice that the following...: Monadnock Paper Mills, Inc. e. Name of Project: Monadnock Hydroelectric Project. f. Location: The existing..., Environmental Services, Monadnock Paper Mills, Inc.; Antrim Road, P.O. Box 339, Bennington, NH 03442; (603) 588...
Working Smart: The Los Angeles Workplace Literacy Project. Final Report.
ERIC Educational Resources Information Center
Los Angeles Unified School District, CA. Div. of Adult and Occupational Education.
The Working Smart workplace literacy project was sponsored by a public school district and several profit and nonprofit companies and conducted for the hotel and food industry in the Los Angeles area. Literacy instruction was merged with job requirements of the customer service job classifications. Videodisc courseware was developed, as were…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
.../energy/wind/mohave.html . The Project is proposed to consist of up to 283 turbines, access roads, and... be supplemented with internal access/service roads to each wind turbine. Proposed ancillary... all action alternatives, Project features within the wind-farm site would include turbines aligned...
ERIC Educational Resources Information Center
Nevels, Vada Germaine
The Hopkinsville-Christian County Library (Kentucky) conducted a project that involved recruitment, public awareness, basic literacy, collection development, tutoring, computer-assisted, other technology, and intergenerational/family programs. The project served a community of 50,000-100,000 people, and targeted the learning disabled,…
ERIC Educational Resources Information Center
Glosson, Linda R.; Bowers, Candice H.
A Texas project assessed postsecondary vocational home economics instructors' needs for instructional media and materials as well as the need for training in the development of curriculum materials. Relevant post-secondary programs identified were child development, food service/dietetics, fashion design/tailoring, and interior design. In…
Collaborative Project on Serving Linguistically Diverse Seniors. Final Report.
ERIC Educational Resources Information Center
Burt, Miriam
In 2002, the Center for Applied Linguistics (CAL) collaborated with the Senior Service Association (SSA) and the American Society on Aging (ASA) on a two-phase project to improve the effectiveness of ASA's sub-grantees in serving linguistically and culturally diverse populations. SSA provides subsidized employment for low-income seniors and funds…
ERIC Educational Resources Information Center
Burger, Laura J.; And Others
The goal of this project was to develop, validate, and utilize a process for vertically articulating curriculum between secondary and post secondary levels of vocational technical education throughout the state of Minnesota. Procedures involved the identification of two areas of staff responsibility: research and development, and service to local…
ERIC Educational Resources Information Center
Cole, Lucy; Fraser, Ruth
The Columbia County Public Library (Lake City, Florida) conducted a project that involved recruitment, retention, public awareness, training, basic literacy, collection development, tutoring, computer- assisted, other technology, intergenerational/family, and English as a Second Language (ESL) programs. The project served a community of…
FAMILY AND MENTAL HEALTH PROBLEMS IN A DEAF POPULATION.
ERIC Educational Resources Information Center
RAINER, JOHN D., ED.; AND OTHERS
THE FINAL REPORT OF THE MENTAL HEALTH PROJECT FOR THE DEAF IS PRESENTED. FOLLOWING AN EXPLANATION OF THE PROJECT AND ITS PROCEDURES AND AN HISTORICAL REVIEW OF SPECIAL EDUCATION AND MENTAL HEALTH SERVICES ARE REPORTS (BY INDIVIDUAL AUTHORS) OF THE RESEARCH PROGRAM WITHIN THE NEW YORK STATE DEAF POPULATION, THE REPORTS CONSIDER (1) METHODOLOGICAL…
Communication Platform Payload Definition (CPPD) study. Volume 2: Technical report
NASA Technical Reports Server (NTRS)
Hunter, E. M.; Driggers, T.; Jorasch, R.
1986-01-01
This is Volume 2 (Technical Report) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.
Communication Platform Payload Definition (CPPD) study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hunter, E. M.
1986-01-01
This is Volume 1 (Executive Summary) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.
Communication Platform Payload Definition (CPPD) study. Volume 3: Addendum
NASA Technical Reports Server (NTRS)
Hunter, E. M.; Driggers, T.; Jorasch, R.
1986-01-01
This is Volume 3 (Addendum) of the Ford Aerospace & Communications Corporation Final Report for the Communication Platform Payload Definition (CPPD) Study Program conducted for NASA Lewis Research Center under contract No. NAS3-24235. This report presents the results of the study effort leading to five potential platform payloads to service CONUS and WARC Region 2 traffic demand as projected to the year 2008. The report addresses establishing the data bases, developing service aggregation scenarios, selecting and developing 5 payload concepts, performing detailed definition of the 5 payloads, costing them, identifying critical technology, and finally comparing the payloads with each other and also with non-aggregated equivalent services.
ERIC Educational Resources Information Center
College Entrance Examination Board, New York, NY. Future Directions for a Learning Society.
A Project designed, demonstrated, and disseminated a Study Organizer Center (SOC) for United Auto Workers (UAW) employees. This SOC was to provide information and services to help the workers better understand their tuition refund program, formulate personal occupational objectives, and pursue their interest through existing educational…
Provider Services Network Project. Draft Final Report.
ERIC Educational Resources Information Center
Urban and Rural Systems Associates, San Francisco, CA.
This draft report on the development and testing of a child care Provider Services Network (PSN) model in Santa Clara County, California, includes a handbook (Manual to Optimize a PSN) designed to provide the State Department of Education and regional or local child care coordinating agencies with information needed to develop PSN optimization…
ERIC Educational Resources Information Center
Griffiths, Jose-Marie; And Others
This document contains validated activities and competencies needed by information professionals working in an information service company. The activities and competencies are organized according to the functions which information professionals in such companies perform: project management; reference/analysis of secondary data; research, analysis,…
WAGES (Women and Girls Employment Enabling Service): Final Report.
ERIC Educational Resources Information Center
Thomas, Leathia S.; Dickey, Sandy
The two-year report of the WAGES project (Women and Girls Employment Enabling Service) documents the growth, problems, and success experienced through efforts to open nontraditional fields of employment to women by way of a community-based program in Memphis, Tennessee. Staff and volunteers provided counseling and referrals to applicants. Personal…
ERIC Educational Resources Information Center
Lesh, Seymour; And Others
This demonstration aims at eliminating major obstacles blocking career advancement of human service paraprofessionals. It seeks to develop new options for upgrading workers in four occupations: addiction services, child development, occupational therapy, and teaching. The policies and practices of educational institutions, employers, unions,…
1993-03-05
Supervisor, Fish and Wildlife Service, Ventura, California Field Supervisor, Fish and Wildlife Service, Laguna Nigel, California Assistant Regional...the weight regressions developed by Dr. Michael Weinstein for the tortoises at the Honda project. If a tortoise is determined to be underweight, the
Skills Conversion Project: Chapter 16, Public Services. Final Report.
ERIC Educational Resources Information Center
National Society of Professional Engineers, Washington, DC.
From November 1971 to February 1972 the National Society of Professional Engineers conducted a study for the U.S. Department of Labor of public services of Orange County, California, to identify employment potential for scientific personnel in aerospace and defense engineering. The study findings were that fewer than 50 new jobs will become…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-04
..., Delta Junction, AK AGENCY: Alaska State Office, Natural Resources Conservation Service, USDA. ACTION..., the State Conservationist (Alaska) found that the project would not result in a significant impact on... Service, Palmer State Office, 800 West Evergreen, Suite 100, Palmer, AK 99645. 2. Natural Resources...
ERIC Educational Resources Information Center
Wonser, Renee; Kohns, Donald
Growing out of a project to improve administrative and support services for North Dakota student vocational organizations, this manual outlines possible duties and responsibilities of a state-level student vocational organizational coordinator based on a sequential planning and implementation system. The manual is divided into four areas with…
Manage Hydrologic Fluxes Instead of Land Cover in Watershed Services Projects
NASA Astrophysics Data System (ADS)
Brauman, K. A.; Ponette-González, A. G.; Marin-Spiotta, E.; Farley, K. A.; Weathers, K. C.; Young, K. R.; Curran, L. M.
2014-12-01
Payments for Watershed Services (PWS), Water Funds, and other payment schemes intended to increase the delivery of hydrologic ecosystem services have great potential for ensuring water resources for downstream beneficiaries while improving livelihoods for upstream residents. However, it is often ambiguous which land-management options should be promoted to enhance watershed service delivery. In many watershed investment programs, specific land covers are promoted as proxies for water service delivery. This approach is based on assumed relationships between land cover and water service outcomes. When land cover does not sufficiently describe ecosystem characteristics that affect water flow, however, desired water services may not be delivered. The use of land cover proxies is especially problematic for watershed investments in the tropics, where many projects are located, because these proxies rely on generalizations about landscape hydrology established for temperate zones. Based on an extensive review of hydrologic fluxes in the high-elevation tropics, we argue that direct management of hydrologic fluxes is a good design for achieving quantifiable results. We use case studies from sites in the Caribbean and Latin American tropics to illustrate how designers of watershed payment projects can manage hydrologic fluxes. To do so, projects must explicitly articulate the water service of interest based on the specific social setting. Projects must also explicitly account for the particulars of the geographic setting. Finally, outcomes must be assessed relative to water services delivered under an alternative land use or land cover scenario.
The LiveWire Project final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, C.D.; Nelson, T.T.; Kelly, J.C.
Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local areamore » network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.« less
ERIC Educational Resources Information Center
Longview Public Library, WA.
Project Read at the Longview (Washington) Public Library conducted a program to maintain and expand the Family Literacy Center to provide a monitored tutoring site and family outreach program for a minimum of 75 adult learners and 40 tutors. Two projects were involved: (1) Project READ focused on adult learners with a one-on-one tutoring approach;…
ERIC Educational Resources Information Center
Epler, Doris M.
This project extended two previous projects which were designed to assist teachers in building the necessary skills to plan, develop, and implement competency-based vocational education (CBVE). In addition to released time for instructors, the project provided the funds necessary to form an articulation team effort among Pennsylvania's Reading…
Final Report - Navajo Electrification Demonstration Project - FY2004
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kenneth L. Craig, Interim General Manager
2007-03-31
The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.
ERIC Educational Resources Information Center
Angelina, Edward; Duque, Diana L.
An evaluation was done of the first year of a 2-year renewal program at three high schools in New York City, Harmony in Career Learning and Scholastic System (Project HI-CLASS), designed to provide support services to students of limited English proficiency (LEP). The project proposed to provide individualized instruction focusing on basic skills,…
ERIC Educational Resources Information Center
Abdo, Carol A.
The Nontraditional Career Opportunities Project was originally developed to recruit, retain, and place students into vocational programs considered nontraditional for their gender. Primary concerns were delivery of printed materials giving information on nontraditional careers and project services; community relations activities and products,…
Final Report - Cloud-Based Management Platform for Distributed, Multi-Domain Networks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chowdhury, Pulak; Mukherjee, Biswanath
2017-11-03
In this Department of Energy (DOE) Small Business Innovation Research (SBIR) Phase II project final report, Ennetix presents the development of a solution for end-to-end monitoring, analysis, and visualization of network performance for distributed networks. This solution benefits enterprises of all sizes, operators of distributed and federated networks, and service providers.
ERIC Educational Resources Information Center
Vera Inst. of Justice, New York, NY.
The final report of an experimental pre-trial intervention program of intensive manpower services (individual and group counseling and job, training, or academic placement with the help of career developers) for selected defendants in Manhattan covers the period November 1967 through October 1970. After three years and 1,300 participants,…
A Different Approach to the Evaluation of Research Libraries. Research Brief No. 6.
ERIC Educational Resources Information Center
Council on Library and Information Resources, Washington, DC.
In 1996, the Council on Library and Information Resources (CLIR) supported a project at Rutgers University that applied new economic theories to measuring how well research libraries fulfill their service roles. This summary draws on the original proposal and the final report from the project's directors. The evaluation of library performance is…
ERIC Educational Resources Information Center
Hess, Therese M.
The Martinsburg-Berkeley County Public Library (West Virginia) conducted a project that involved recruitment, retention, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer assisted, other technology, and English as a Second Language (ESL) programs. The project served a three-county community…
ERIC Educational Resources Information Center
Bender, Evelyn
The American Library Association's Carroll Preston Baber Research Award supported this project on the use, impact and feasibility of a computer assisted writing facility located in the library of Stetson Middle School in Philadelphia, an inner city school with a population of minority, "at risk" students. The writing facility consisted…
ERIC Educational Resources Information Center
Colhapp, Barbara; Miller, Lana
The Carver County Library System (Chaska, Minnesota) conducted a project to demonstrate adult educational teamwork between libraries and literacy agents in the Carver-Scott two county area. The project, "National Issues Forums (NIF) for the New Reader," extended educational opportunities that encouraged new adult readers and the public…
A Comprehensive, Coordinated Child Care System. Final Report.
ERIC Educational Resources Information Center
Colorado Univ., Denver. Medical Center.
The establishment and subsequent modification of a child care system for employees, faculty, and students of the University of Colorado Medical Center are discussed in detail. The project was partially funded by the Office of Child Development. Components of the project included three direct service programs: (1) day care for children ages 2 1/2…
ERIC Educational Resources Information Center
Mitra, Sudhansu B.
This series of followup studies concerned mentally retarded rehabilitation clients of the Social and Rehabilitation Service research and development projects in the District of Columbia, and the Model Cities Project in Maryland. The clientele were primarily black, urban ghetto residents. The studies dealt with (1) vocational success of…
ERIC Educational Resources Information Center
Schacht, Robert M.; Gahungu, Athanase; Gallagher, Larry
This report discusses a project that compared the rate of use of assistive technology (AT) services and devices by American Indians and Alaska Natives with that of other ethnically diverse groups, identified barriers, and examined consumer satisfaction regarding AT. The project drew on four sources of data: the Rehabilitation Services…
ERIC Educational Resources Information Center
Johanson, Joyce; Clark, Letha; Daytner, Katrina; Robinson, Linda
2009-01-01
Accessing Curriculum through Technology Tools (ACTTT), a model development project, was developed and tested by staff of the Center for Best Practices in Early Childhood (the Center), a research and development unit within the College of Education and Human Services at Western Illinois University. The major goal of ACTTT was to develop,…
75 FR 38184 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
...-8 provides final income, estate and gift, and employment tax regulations relating to elections made..., and purchase of services to provide information. Approved: June 23, 2010. Gerald J. Shields, IRS...
78 FR 47057 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-02
... final income, estate and gift, and employment tax regulations relating to elections made under the..., and purchase of services to provide information. Approved: July 29, 2013. Allan Hopkins, Tax Analyst...
Studies in Adolescent Health: Research to Improve Health Services for Mothers and Children.
ERIC Educational Resources Information Center
California Univ., Los Angeles. School of Public Health.
This publication is one in a series summarizing final reports of research projects concerned with improving health services for mothers, children and physically handicapped youth. Topics of the 10 reports include: (1) ambulatory care patterns of urban adolescents in New York City, (2) selected parameters of school achievement among New York City…
ePortfolios beyond Pre-Service Teacher Education: A New Dawn?
ERIC Educational Resources Information Center
Boulton, Helen
2014-01-01
The aim of this paper is to demonstrate the efficacy of using ePortfolios to enhance career skills for newly qualified teachers (NQTs). The context is the final phase of a longitudinal action research project investigating whether an ePortfolio, created as a pre-service teacher to evidence a digital story of developing professional identity, could…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... DEPARTMENT OF THE INTERIOR National Park Service [5284-TT02-371] Notice of Availability: Tamiami..., Florida AGENCY: National Park Service, Interior. ACTION: Notice of Availability. The Notice of Intent (NOI... crown elevation to 12.3 feet, the minimum required based on the design high water of 9.7 feet and the...
Barchitta, M; Fragapane, S; Consoli, M T; Pennisi, C; Agodi, A
2012-01-01
The growing needs of people with disabilities require to integrate this issue into public health in order to improve political feasibility and to ensure that disability will not be left off from any strategic table. The main aim of the "Care for Work" project was to provide training contents to help workers and unemployed people to adapt their knowledge, skills and competencies to the care services sector in order to facilitate their insertion in a new employment source. The partners participating in the project are Organizations from 5 European countries. The project has been divided into seven Work Packages (WPs): three transversal WPs and four specific WPs, each addressing specific activities necessary to achieve the final objectives of the project. The "Care for Work" learning environment contains specific information and training on the techniques for caring people with acquired physical disabilities, as text documents and short training films. The project combines e-learning (Web 2.0) and mobile learning providing a flexible training platform for workers of care services sector. The "Care for Work" project offers specific training addressed to meet the new existing needs of workers of the care services sector and/or unemployed people. All the information and results of the project are available on the web page: www.careforwork.eu, and the present article is part of the WP "Valorization".
Human factors issues in telerobotic systems for Space Station Freedom servicing
NASA Technical Reports Server (NTRS)
Malone, Thomas B.; Permenter, Kathryn E.
1990-01-01
Requirements for Space Station Freedom servicing are described and the state-of-the-art for telerobotic system on-orbit servicing of spacecraft is defined. The projected requirements for the Space Station Flight Telerobotic Servicer (FTS) are identified. Finally, the human factors issues in telerobotic servicing are discussed. The human factors issues are basically three: the definition of the role of the human versus automation in system control; the identification of operator-device interface design requirements; and the requirements for development of an operator-machine interface simulation capability.
76 FR 33025 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-07
...-01 (Final). Abstract: The regulations relate to the income, employment, and gift taxation of split...) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to...
Decentralized sensor fusion for Ubiquitous Networking Robotics in Urban Areas.
Sanfeliu, Alberto; Andrade-Cetto, Juan; Barbosa, Marco; Bowden, Richard; Capitán, Jesús; Corominas, Andreu; Gilbert, Andrew; Illingworth, John; Merino, Luis; Mirats, Josep M; Moreno, Plínio; Ollero, Aníbal; Sequeira, João; Spaan, Matthijs T J
2010-01-01
In this article we explain the architecture for the environment and sensors that has been built for the European project URUS (Ubiquitous Networking Robotics in Urban Sites), a project whose objective is to develop an adaptable network robot architecture for cooperation between network robots and human beings and/or the environment in urban areas. The project goal is to deploy a team of robots in an urban area to give a set of services to a user community. This paper addresses the sensor architecture devised for URUS and the type of robots and sensors used, including environment sensors and sensors onboard the robots. Furthermore, we also explain how sensor fusion takes place to achieve urban outdoor execution of robotic services. Finally some results of the project related to the sensor network are highlighted.
ERIC Educational Resources Information Center
Bosma and Associates International, Seattle, WA.
This final report presents an independent formative and summative evaluation of the National Library Services for the Blind and Physically Handicapped (NLS/BPH) braille and audio magazine program. In this program, 77 magazines are distributed directly to subscribers, with 43 magazines available on audio flexible discs and 34 magazines available in…
Intermediate Outcomes, Strategies, and Challenges of Eight Healthy Start Projects
Walker, Deborah Klein; Hargreaves, Margaret; Rosenbach, Margo
2008-01-01
Site visits were conducted for the evaluation of the national Healthy Start program to gain an understanding of how projects design and implement five service components (outreach, case management, health education, depression screening and interconceptional care) and four system components (consortium, coordination/collaboration, local health system action plan and sustainability) as well as program staff’s perceptions of these components’ influence on intermediate outcomes. Interviews with project directors, case managers, local evaluators, clinicians, consortium members, outreach/lay workers and other stakeholders were conducted during 3-day in-depth site visits with eight Healthy Start grantees. Grantees reported that both services and systems components were related to self-reported service achievements (e.g. earlier entry into prenatal care) and systems achievements (e.g. consumer involvement). Outreach, case management, and health education were perceived as the service components that contributed most to their achievements while consortia was perceived as the most influential systems component in reaching their goals. Furthermore, cultural competence and community voice were overarching project components that addressed racial/ethnic disparities. Finally, there was great variability across sites regarding the challenges they faced, with poor service availability and limited funding the two most frequently reported. Service provision and systems development are both critical for successful Healthy Start projects to achieve intermediate program outcomes. Unique contextual and community issues influence Healthy Start project design, implementation and reported accomplishments. All eight projects implement the required program components yet outreach, case management, and health education are cited most frequently for contributing to their perceived achievements. PMID:19011959
ERIC Educational Resources Information Center
Holder, Loreta
This final report describes a federally-funded project that was designed to provide a model for service delivery to severely physically involved infants and their families living in the highly rural area of West Alabama. The project developed and refined an eclectic treatment approach known as Developmental Physical Management Techniques (DPMT).…
ERIC Educational Resources Information Center
Camp, Gloria S.
The Ouachita Parish Public Library (Louisiana) conducted a project that involved recruitment, coalition building, public awareness, training, basic literacy, collection development, tutoring, technology, and English as a Second Language (ESL) programs. The project served a community of over 200,000 people, and targeted the learning disabled,…
Senior Alcohol Services Revisited: Elderly Alcoholism--Current State of the Art.
ERIC Educational Resources Information Center
Dunlop, Jean D.
This report notes the growing awareness of alcohol problems among the elderly during the past 5 to 10 years, and reviews the final conclusions of the federal demonstration project, Senior Alcohol Services. Five basic concepts are included: (1) there are a growing number of elderly persons with alcohol problems (10-15% of all persons over age 60);…
ERIC Educational Resources Information Center
Bidwell, Charles M.; Auricchio, Dominick
The project set out to establish an operational film scheduling network to improve service to New York State teachers using 16mm educational films. The Network is designed to serve local libraries located in Boards of Cooperative Educational Services (BOCES), regional libraries, and a statewide Syracuse University Film Rental Library (SUFRL). The…
Manpower Advisory Services in the Workplace: A Missing Link in National Manpower Policy. Volume I.
ERIC Educational Resources Information Center
Hansen, Gary B.; Bentley, Marion T.
This first volume of a two-volume final report contains description and findings of a 3-year research and demonstration project in which a small human resource diagnostic and consulting service was established at a State land-grant institution (Utah State University) to provide a broadly based technical assistance program directed toward improving…
ERIC Educational Resources Information Center
Northern Montana Coll., Havre.
The dissemination phase (Phase II) of the Rural Shared Services Project is reported in this document. Efforts of the dissemination phase were concentrated in 5 target states: Vermont, Georgia, Wyoming, Montana, and New Mexico; national dissemination was limited to attendance at national conferences, the U. S. Office of Education PREP materials for…
ERIC Educational Resources Information Center
Mason, Robert M.; And Others
This document presents a research effort intended to improve the economic information available for formulating politics and making decisions related to Information Analysis Centers (IAC's) and IAC services. The project used a system of IAC information activities to analyze the functional aspects of IAC services, calculate the present value of net…
Research of application mode for FTTX technology
NASA Astrophysics Data System (ADS)
Wang, Zhong; Yun, Xiang; Huang, Wei
2009-08-01
With rapid development of Internet and broadband access network, the technologies of xDSL, FTTx+LAN, WLAN have more applications, new network service emerges in endless stream, especially the increase of network game, meeting TV, video on demand, etc. FTTH supports all present and future service with enormous bandwidth, including traditional telecommunication service, traditional data service and traditional TV service, and the future digital TV and VOD. With huge bandwidth of FTTH, it wins the final solution of broadband network, becomes the final goal of development of optical access network. In this paper, technique theory of EPON is introduced at first. At the same time, MAC frame structure, automatic detection and ranging of MPCP, DBA,and multi-LLID of EPON is analyzed. Then, service development ability, cost advantage and maintenance superiority based on EPON technology are carried out. At last,with Cost comparison between FTTH / FTTB building model and the traditional model, FTTB + LAN mode which is suitable for the newadding residential users in general areas and FTTN + DSL mode which is suitable for the old city and rural access network transformation are built up in detail. And FTTN + DSL project of rural information in rural areas and FTTH broadband HOUSE project on service solutions program are analyzed. comparing to the traditional access technologies, EPON technology has the obvious advantages, such as distance transmission, high or wide band, saving line resources, service abilities, etc. These are the qualities which not only be served for home users, but solve more access problems for us effectively.
78 FR 24292 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-24
... 199 corridor as part of the STAA network of truck routes. The project involves realigning curves... address provided above. The U.S. Fish and Wildlife Service consultation and Biological Opinion are...
MTU-pre-service teacher enhancement program. Final report, September 1992--May 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, C.S.; Yarroch, W.J.
1996-01-01
The MTU Pre-Service Teacher Enhancement Program was a two year extended project designed to introduce a select group of science and engineering undergraduate students, with good {open_quotes}people skills,{close_quotes} to the teaching profession. Participants were paid for their time spent with area teacher/mentors and were involved in a variety of in school activities, projects and observations to illustrate the teaching profession. They were encouraged to consider the teaching profession as a future career option. The student participants, however, were under no obligation to enter the Teacher Education Program at the conclusion of the program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hosking, H.
The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.
ERIC Educational Resources Information Center
Bruder, Mary Beth
This final report describes the activities and outcomes of a project designed to develop, implement, and evaluate a new three-year longitudinal competency based curriculum for pediatric residents on their role in early intervention and special education. The curriculum consisted of four half-days per month for every resident in an ambulatory…
ERIC Educational Resources Information Center
Director, Elissa
This final performance report for the Libraries of Middlesex literacy project begins with a section that compares actual accomplishments to the following objectives for 1992-93: (1) recruit and enroll at least 150 new volunteers in Basic Reading of English as a Second Language (ESL) tutor training; (2) have at least 125 volunteers successfully…
ERIC Educational Resources Information Center
Warren, Carol E.
The Harlan County Public Library Literacy Project (Kentucky) provided rural-oriented, basic literacy, and oral history programs to a community of 100,000-200,000. The goal of the project was to produce six booklets about local people and issues, to be used as literacy materials in programs with Appalachian students. Students wanted to produce…
ERIC Educational Resources Information Center
Smith, Anita P.; And Others
In a project designed to train customer service personnel in improved methods of assisting the physically disabled, audio-visual training materials were developed and presented during 2-week courses involving 1,058 employees at transportation, hotel/restaurant, and entertainment centers in 25 cities. The participants judged the training program…
ERIC Educational Resources Information Center
Shworles, Thomas R.
The project (1968-1973) was undertaken to demonstrate job and earning potential for competitive work of homebound and/or severely disabled persons who otherwise have not benefited from rehabilitation programs as they conventionally exist. In the lifetime of this project, three companies were formed: An non-emergency transportation service for the…
Analysis of curved weathering steel box girder bridges in fire : final report.
DOT National Transportation Integrated Search
2016-05-31
Box girder bridges are becoming more common because of their ease of construction, pleasing aesthetics, and serviceability. Projects with curved : configuration and long spans can especially benefit from these advantages. However, the industry lacks ...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-25
... recovery projects and issues associated with fugitive methane. Bruce Hedman, ICF International, on behalf... associated with fugitive methane. Richard D. Murphy, S.V.P. Energy Solutions Services, National Grid, on...
Evaluation of pedestrian safety campaigns : final report.
DOT National Transportation Integrated Search
2004-02-01
The objective of the study was to determine the efficacy and success of SHAs public service campaign : regarding pedestrian safety. Data collection issues forced a change in this focus as the project progressed. : The study contains two issues tha...
Brittle-ductile transition of steel bridges, volume I : final report.
DOT National Transportation Integrated Search
1990-05-01
The transition behavior of bridge steels and weldments largely determines the ir toughness under : service loading rates and temperatures. Two aspects of the transition were investigated in this : project: The first was to develop a better understand...
LANDSCAPE INDICATORS OF ECOSYSTEM SERVICE BENEFITS. (R827921)
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Bridge deck concrete volume change : final contract report.
DOT National Transportation Integrated Search
2010-02-01
Concrete structures such as bridge decks, with large surface area relative to volume, shrink and crack, thus reducing service life performance and increasing operation costs. The project evaluated the early, first 24 hours, and long-term, 180 days, s...
Decentralized Sensor Fusion for Ubiquitous Networking Robotics in Urban Areas
Sanfeliu, Alberto; Andrade-Cetto, Juan; Barbosa, Marco; Bowden, Richard; Capitán, Jesús; Corominas, Andreu; Gilbert, Andrew; Illingworth, John; Merino, Luis; Mirats, Josep M.; Moreno, Plínio; Ollero, Aníbal; Sequeira, João; Spaan, Matthijs T.J.
2010-01-01
In this article we explain the architecture for the environment and sensors that has been built for the European project URUS (Ubiquitous Networking Robotics in Urban Sites), a project whose objective is to develop an adaptable network robot architecture for cooperation between network robots and human beings and/or the environment in urban areas. The project goal is to deploy a team of robots in an urban area to give a set of services to a user community. This paper addresses the sensor architecture devised for URUS and the type of robots and sensors used, including environment sensors and sensors onboard the robots. Furthermore, we also explain how sensor fusion takes place to achieve urban outdoor execution of robotic services. Finally some results of the project related to the sensor network are highlighted. PMID:22294927
ERIC Educational Resources Information Center
Berney, Tomi D.; And Others
Project CALA was a special alternative program at the International High School in Queens (New York City). In its first year, the project provided instructional and support services, emphasizing career education, to 171 high school students of limited English proficiency (LEP) who had lived in the United States for less than 4 years. The project…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aptekar, Alexander
The final report on New York City College of Technology (City Tech) DURA (Diverse | Urban | Resilient | Adaptable) home project. City Tech has participated in the Solar Decathlon 2015 project as DURA. The DURA team consists of students, faculty, volunteers, Service Corps participants, Industry advisers, recent graduates and others. The DURA team researched, designed, and constructed a zero energy prototype house. This process was a valuable opportunity for City Tech as a project of such scale has not been completed before with the integration of so many departments and their students.
ERIC Educational Resources Information Center
Marshall, Catherine A.; And Others
A participatory action research project examined vocational rehabilitation (VR) services provided in New York State to American Indians with behavioral health diagnoses, including dual diagnoses involving substance abuse. In 1991, the New York public VR system had 81 American Indians apply for VR services (only 2.8 percent of American Indians with…
Final Nellis Air Force Base Capital Improvements Program Environmental Assessment
2013-08-01
USCB United States Census Bureau USFWS United States Fish and Wildlife Service VOC Volatile Organic Compound WINDO Wing Infrastructure and...desert tortoise, consultation with the United States (U.S.) Fish and Wildlife Service would be initiated. Consultation with the U.S. Army Corps of...and decrease energy consumption on military installations. The projects described in the CIP are derived from the Base Comprehensive Asset Management
ERIC Educational Resources Information Center
National Association of State Directors of Special Education, Alexandria, VA.
This report reviews the outcomes of a forum convened to examine policy and practice issues surrounding the annual evaluation of effectiveness of programs and services for students with disabilities. At the forum, alternative approaches being used by states to implement program evaluation were discussed, along with issues in gathering…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-06
The purpose of the briefing book is to provide project information to U.S. Businesses who seek cooperative partnerships with Vietnamese officials on a number of major development projects. The report is divided into the following sections: (1) Executive Summary; (2) Overview of Vietnam; (3) Overview of the Upstream Sector; (4) Overview of the Downstream Sector; (5) Overview of the Petrochemical Sector; (6) Overview of the Electric Energy Sector; (7) Project Development Processes; (8) Project Financing; (9) Foreign Competition and U.S. Competitiveness; (10) Project Profiles; (11) Key Contracts; (12) U.S. Commercial Service.
The DPACS project at the University of Trieste.
Fioravanti, F; Inchingolo, P; Valenzin, G; Dalla Palma, L
1997-01-01
The DPACS project (Data and Picture Archiving and Communication System) was undertaken at the University of Trieste by the Institute of Radiology and the DEEI (Dipartimento di Elettrotecnica, Elettronica ed Informatica), in collaboration with the CRSTBS (Centro Ricerche e Studi Tecnologie Biomediche Sanitarie) of the Area Science Park and the Azienda Ospedaliera of Trieste. The main objective of this project is to create an open system for the management of clinical data and images and for the integration of health care services. The first phase is oriented toward finding an implementation strategy for the creation of a prototype DPACS system, to serve as a starting point for the realization of a distributed structure for the extension of the service, firstly to the entire structure of the Cattinara Hospital and subsequently to all the Public Health units in Trieste. After local testing, the service will finally be expanded to a wider geographical level. The intensive computerization of the Institute of Radiology furnished the most favourable environment for the verification of the prototype, as the service provided by the existing RIS (Radiology Information System) and PACS (Picture and Archiving Communication System) has long been consolidated. One of the main goals of the project, in particular, is to replace the old, by now obsolete, PACS with the DPACS services.
NASA Astrophysics Data System (ADS)
Balletta, P.; Biagini, M.; Gallinaro, G.; Vernucci, A.
2003-07-01
This paper provides an overview of the on-going project COMPOSE, an EC co-funded project aiming to define, specify and validate an innovative mobile-services scenario in support of travellers, and to demonstrate the effectiveness of the new proposed location-based value-added services. COMPOSE is supported by organisations belonging to numerous categories covering, as a whole, the entire value-chain of infomobility services provision to the final user. The project team comprises, in addition to the affiliations of the authors, also Teleatlas (NL), ARS T&TT (NL), Alcatel-Bell Space (B), Skysoft (P), Hitech Marketing (A) and MobileGis (IR). The paper describes the services that will be offered to users, encompassing both the pre-trip and the on-trip framework, presents the overall hybrid system architecture also including a via-satellite component based upon the Wideband-CDMA (W-CDMA) technique adopted in UMTS, discusses the access solutions envisaged for that component permitting multiple feeder-link stations to share the CDMA multiplex capacity by directly transmitting their codes to the satellite, and illustrates the results of some computer simulations intended to assess the performance of said access solutions, with regard to the effects of the inevitable up- link frequency errors and transponder non-linearity.
2013-06-19
The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for a Rehabilitation Engineering Research Center (RERC) on Technologies to Support Successful Aging with Disability under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). The Assistant Secretary may use this priority for a competition in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend to use this priority to improve outcomes for individuals with disabilities.
2013-06-14
The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for a Rehabilitation Engineering Research Center (RERC) on Universal Interfaces and Information Technology Access under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). The Assistant Secretary may use this priority for a competition in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend to use this priority to improve outcomes for individuals with disabilities.
Community Linkage Plan. Final Report.
ERIC Educational Resources Information Center
Ouachita Vocational Technical School, Malvern, AR.
A project was designed to maintain cooperation, coordination, and service between Ouachita Vocational Technical School (OVTS) in Arkansas and local businesses, industries, government agencies, military, and community-based organizations. Specific objectives were to improve community relations; increase campus involvement/commitment with business,…
ERIC Educational Resources Information Center
STEWART, E. ELIZABETH; WILLIAMS, RICHARD H.
THIS DOCUMENT IS SECTION 1 OF A 3-PART REPORT BY THE EDUCATIONAL TESTING SERVICE. THIS SECTION DESCRIBES, IN EXTENSIVE STATISTICAL TERMS, A SAMPLE OF 445 HEAD START CHILDREN IN TERMS OF THEIR SCORES ON (1) THE STANFORD-BINET L-M, (2) THE CALDWELL PRESCHOOL INVENTORY, AND (3) THE PROJECT HEAD START BEHAVIOR INVENTORY. THE SAMPLING PROCEDURES USED…
Sustainable Range Management of RDX and TNT by Phytoremediation with Engineered Plants
2016-04-01
FINAL REPORT Sustainable Range Management of RDX and TNT by Phytoremediation with Engineered Plants SERDP Project ER-1498 APRIL 2016...specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its...by Phyoremediation with Engineered Plants 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER ER-1498 Neil C
Mayer, Gerhard; Quast, Christian; Felden, Janine; Lange, Matthias; Prinz, Manuel; Pühler, Alfred; Lawerenz, Chris; Scholz, Uwe; Glöckner, Frank Oliver; Müller, Wolfgang; Marcus, Katrin; Eisenacher, Martin
2017-10-30
Sustainable noncommercial bioinformatics infrastructures are a prerequisite to use and take advantage of the potential of big data analysis for research and economy. Consequently, funders, universities and institutes as well as users ask for a transparent value model for the tools and services offered. In this article, a generally applicable lightweight method is described by which bioinformatics infrastructure projects can estimate the value of tools and services offered without determining exactly the total costs of ownership. Five representative scenarios for value estimation from a rough estimation to a detailed breakdown of costs are presented. To account for the diversity in bioinformatics applications and services, the notion of service-specific 'service provision units' is introduced together with the factors influencing them and the main underlying assumptions for these 'value influencing factors'. Special attention is given on how to handle personnel costs and indirect costs such as electricity. Four examples are presented for the calculation of the value of tools and services provided by the German Network for Bioinformatics Infrastructure (de.NBI): one for tool usage, one for (Web-based) database analyses, one for consulting services and one for bioinformatics training events. Finally, from the discussed values, the costs of direct funding and the costs of payment of services by funded projects are calculated and compared. © The Author 2017. Published by Oxford University Press.
Homelessness: Recent Statistics, Targeted Federal Programs, and Recent Legislation
2005-05-31
submit semiannual financial and program reports, as well as a final report 90 days after the end of the project period. Transitional Living Program. (42...costs. To prevent homelessness, financial assistance may be given to families who have received eviction or termination of utility service notices if...assistance. Centers must also be equipped to provide job training, counseling and placement services (including job readiness and literacy and skills
ERIC Educational Resources Information Center
Goodluck, Charlotte T.
The purpose of this research project was to investigate the utility of the genogram and eco-map as family assessment tools for working with American Indian vocational rehabilitation (VR) clients who are referred for rehabilitation services, and to describe changes in the family system after VR services have been delivered by evaluating information…
ERIC Educational Resources Information Center
LEVISON, MELVIN E.
THIS PROJECT TESTED A METHOD FOR DEVELOPING "AUDIO-VISUAL LITERACY" AND, AT THE SAME TIME, AN EMPATHIC UNDERSTANDING OF ANOTHER CIVILIZATION THROUGH THE USE OF A SERIES OF SELECT FILMS. THE POPULATION CONSISTED OF 28 TEACHERS IN AN IN-SERVICE COURSE AND CLASSES LATER TAUGHT BY IN-SERVICE TRAINED TEACHERS IN FIVE SECONDARY SCHOOLS--THREE…
ERIC Educational Resources Information Center
Stinson, Michael; Elliot, Lisa; McKee, Barbara; Coyne, Gina
This report discusses a project that adapted new automatic speech recognition (ASR) technology to provide real-time speech-to-text transcription as a support service for students who are deaf and hard of hearing (D/HH). In this system, as the teacher speaks, a hearing intermediary, or captionist, dictates into the speech recognition system in a…
ERIC Educational Resources Information Center
Sessa, Valerie I.; Matos, Cristina; Hopkins, Courtney A.
2009-01-01
The purpose of this study was to evaluate final projects in a freshman leadership course (combining grounding in leadership theories with a service-learning component) to determine what students learned about leadership, themselves as developing leaders, and leading in the civic community, and how deeply they learned these concepts. Students found…
NASA Astrophysics Data System (ADS)
Yuk Chan, Cecilia Ka
2012-08-01
Experiential learning pedagogy is taking a lead in the development of graduate attributes and educational aims as these are of prime importance for society. This paper shows a community service experiential project conducted in China. The project enabled students to serve the affected community in a post-earthquake area by applying their knowledge and skills. This paper documented the students' learning process from their project goals, pre-trip preparations, work progress, obstacles encountered to the final results and reflections. Using the data gathered from a focus group interview approach, the four components of Kolb's learning cycle, the concrete experience, reflection observation, abstract conceptualisation and active experimentation, have been shown to transform and internalise student's learning experience, achieving a variety of learning outcomes. The author will also explore how this community service type of experiential learning in the engineering discipline allowed students to experience deep learning and develop their graduate attributes.
Polymer concrete overlay test program : Lebanon Ditch Bridge : final report.
DOT National Transportation Integrated Search
1983-01-01
This report presents information on the installation of a thin polymer concrete overlay and the evaluation of its durability after a 15-month in-service period. The project was performed by the Oregon State Highway Division under the sponsorship of t...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
... Assistance Center on Social-Emotional Intervention for Young Children (CFDA No. 84.326B) and allow for the... services to respond to State needs prioritized on the basis of results of current needs-analyses and...
78 FR 18481 - Project-Level Predecisional Administrative Review Process
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
... Administrative Review Process AGENCY: Forest Service, USDA. ACTION: Final rule. SUMMARY: The United States... process by which the public may file objections seeking predecisional administrative review for proposed... for a predecisional objection process. Section 428 further directs the Secretary to apply these...
Filling Critical Gaps Through Innovative Cradle-to-Grave Training Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burns, Pamela; To, Kimberlin
This project seeks to enhance and provide training on alternative fuels and alternative fuel vehicles to reach mechanics/technicians, first responders, public safety officials, and other critical service providers across the multi-state region of Arkansas, Louisiana, Oklahoma, and Texas
LAFLA public transportation public participation pilot program : final technical report.
DOT National Transportation Integrated Search
2012-12-01
This report documents and presents the results of a pilot project conducted by the Legal Aid Foundation of Los Angeles (LAFLA). LAFLA identified that there is a perception among those living in and providing services to low-income communities that tr...
75 FR 61243 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-209626-93] (TD 8796) Proposed Collection... soliciting comments concerning an existing Final Regulation, REG-209626-93 (TD 8796), Notice, Consent, and... (TD 8796). Abstract: These regulations provide guidance concerning the notice consent requirements...
2014-01-16
This final rule amends the Medicaid regulations to define and describe state plan section 1915(i) home and community-based services (HCBS) under the Social Security Act (the Act) amended by the Affordable Care Act. This rule offers states new flexibilities in providing necessary and appropriate services to elderly and disabled populations. This rule describes Medicaid coverage of the optional state plan benefit to furnish home and community based-services and draw federal matching funds. This rule also provides for a 5-year duration for certain demonstration projects or waivers at the discretion of the Secretary, when they provide medical assistance for individuals dually eligible for Medicaid and Medicare benefits, includes payment reassignment provisions because state Medicaid programs often operate as the primary or only payer for the class of practitioners that includes HCBS providers, and amends Medicaid regulations to provide home and community-based setting requirements related to the Affordable Care Act for Community First Choice State plan option. This final rule also makes several important changes to the regulations implementing Medicaid 1915(c) HCBS waivers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hutchinson, R.L.; Hamilton, V.A.; Istrail, G.G.
1997-11-01
This report describes the results of a Sandia-funded laboratory-directed research and development project titled {open_quotes}Integrated and Robust Security Infrastructure{close_quotes} (IRSI). IRSI was to provide a broad range of commercial-grade security services to any software application. IRSI has two primary goals: application transparency and manageable public key infrastructure. IRSI must provide its security services to any application without the need to modify the application to invoke the security services. Public key mechanisms are well suited for a network with many end users and systems. There are many issues that make it difficult to deploy and manage a public key infrastructure. IRSImore » addressed some of these issues to create a more manageable public key infrastructure.« less
U.S. Energy Service Company (ESCO) Industry: Recent Market Trends
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stuart, Elizabeth; Larsen, Peter H.; Carvallo, Juan Pablo
This study presents an analysis of the market size, growth projections and industry trends of the U.S. Energy Service Company (ESCO) industry, drawing on information provided by ESCO executives in late 2015. We define ESCOs as energy service companies for whom performance-based contracting is a core business offering. We identified forty-seven firms that met our definition of an ESCO.1 Forty-three of these companies responded to our requests for information, representing a 91% response rate.2 We also report 2014 ESCO industry revenues by market segment, region and business activity type, and for new versus existing customers. Finally, we report on usemore » of tax incentives and financing tools, and incorporation of non-energy benefits into performance-based project economics. We summarize key findings below.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, Gary
2010-09-30
This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to bemore » self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.« less
A heuristic method for consumable resource allocation in multi-class dynamic PERT networks
NASA Astrophysics Data System (ADS)
Yaghoubi, Saeed; Noori, Siamak; Mazdeh, Mohammad Mahdavi
2013-06-01
This investigation presents a heuristic method for consumable resource allocation problem in multi-class dynamic Project Evaluation and Review Technique (PERT) networks, where new projects from different classes (types) arrive to system according to independent Poisson processes with different arrival rates. Each activity of any project is operated at a devoted service station located in a node of the network with exponential distribution according to its class. Indeed, each project arrives to the first service station and continues its routing according to precedence network of its class. Such system can be represented as a queuing network, while the discipline of queues is first come, first served. On the basis of presented method, a multi-class system is decomposed into several single-class dynamic PERT networks, whereas each class is considered separately as a minisystem. In modeling of single-class dynamic PERT network, we use Markov process and a multi-objective model investigated by Azaron and Tavakkoli-Moghaddam in 2007. Then, after obtaining the resources allocated to service stations in every minisystem, the final resources allocated to activities are calculated by the proposed method.
A European classification of services for long-term care—the EU-project eDESDE-LTC
Weber, Germain; Brehmer, Barbara; Zeilinger, Elisabeth; Salvador-Carulla, Luis
2009-01-01
Purpose and theory The eDESDE-LTC project aims at developing an operational system for coding, mapping and comparing services for long-term care (LTC) across EU. The projects strategy is to improve EU listing and access to relevant sources of healthcare information via development of SEMANTIC INTER-OPERABILITY in eHEALTH (coding and listing of services for LTC); to increase access to relevant sources of information on LTC services, and to improve linkages between national and regional websites; to foster cooperation with international organizations (OECD). Methods This operational system will include a standard classification of main types of care for persons with LTC needs and an instrument for mapping and standard description of services. These instruments are based on previous classification systems for mental health services (ESMS), disabilities services (DESDE) and ageing services (DESDAE). A Delphi panel made by seven partners developed a DESDE-LTC beta version, which was translated into six languages. The feasibility of DESDE-LTC is tested in six countries using national focal groups. Then the final version will be developed by the Delphi panel, a webpage, training material and course will be carried out. Results and conclusions The eDESDE-LTC system will be piloted in two EU countries (Spain and Bulgaria). Evaluation will focus primarily on usability and impact analysis. Discussion The added value of this project is related to the right of “having access to high-quality healthcare when and where it is needed” by EU citizens. Due to semantic variability and service complexity, existing national listings of services do not provide an adequate framework for patient mobility.
Program Evaluation Grant. Final Report.
ERIC Educational Resources Information Center
Quadco Rehabilitation Center, Inc., Stryker, OH.
The purpose of the project was to increase the effectiveness and efficiency of those rehabilitation facilities which were utilized by the Ohio Rehabilitation Services Commission (RSC) through the development, installation, and utilization of a program evaluation system and a management information system. The two systems were developed and…
DOT National Transportation Integrated Search
2016-12-16
Transportation plans and projects are typically evaluated, both prospectively and retrospectively, with metrics of mobility, notably highway level of service. This practice implicitly treats mobility improvements as desirable. Yet mobility improvemen...
Workplace Skills Enhancement Project. Final Report.
ERIC Educational Resources Information Center
Seattle-King County Private Industry Council, Seattle, WA.
The Seattle-King County Private Industry Council developed and delivered a workplace literacy program in partnership with the following agencies: Employment Opportunities Center, Refugee Federation Services Center, and Center for Career Alternatives. The program provided significant workplace literacy skills to 325 actual enrollees (266 Asian, 15…
75 FR 56658 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... concerning an existing final regulation, REG-209830-96 (TD 8779), Estate and Gift Tax Marital Deduction... Internet at [email protected] . SUPPLEMENTARY INFORMATION: Title: Estate and Gift Tax Marital... of operation, maintenance, and purchase of services to provide information. Approved: September 7...
The EmX Franklin Corridor BRT project evaluation : final report, April 2009.
DOT National Transportation Integrated Search
2009-04-01
Lane Transit District began BRT service on its Franklin Corridor EmX in January 14, 2007. The four mile long route connects downtown Eugene and downtown Springfield, the two main hubs for LTDs system. The corridor, which has the greatest ridership...
NASA Integrated Services Environment
NASA Technical Reports Server (NTRS)
Ing, Sharon
2005-01-01
This slide presentation will begin with a discussion on NASA's current distributed environment for directories, identity management and account management. We will follow with information concerning the drivers, design, reviews and implementation of the NISE Project. The final component of the presentation discusses processes used, status and conclusions.
NASA Hubble Space Telescope (HST) Research Project Capstone Even
2014-05-05
Students and faculty from Mapletown Jr/Sr High School and Margaret Bell Middle School listen as John Grunsfeld, NASA Associate Administrator for the Science Mission Directorate, speaks about his experiences on the final space shuttle servicing mission to the Hubble Space Telescope during the NASA Hubble Space Telescope (HST) Research Project Capstone Event in the James E. Webb Auditorium at NASA Headquarters on Monday, May 5, 2014. Photo Credit: (NASA/Joel Kowsky)
Public Health Service--health maintenance organizations: final regulations.
1980-01-24
These rules amend the Public Health Service (PHS) regulations by implementing certain changes made by the HMO Amendments of 1978 with respect to grants and loan guarantees for planning and initial development costs (Subpart D) and to loans and loan guarantees for initial costs of operation (Subpart E). These regulations change Subpart D by including projects for the "expansion of services" of an HMO among the projects eligible for initial development assistance. In addition, they change the limits on the amount of assistance permitted for initial development projects. These regulations also change Subpart E by substituting the words "costs of operation" for the words "operating costs," thereby expanding the scope of assistance for initial operations (1) to include costs of certain small capital expenditures for equipment and alterations and renovations of facilities and (2) to incorporate into the regulations a longstanding policy which specifies the amount of preaward balance sheet liabilities which may be paid for with funds under operating loans (whether made directly or guaranteed by the Secretary).
Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course
NASA Astrophysics Data System (ADS)
Draper, Alison J.
2004-02-01
In an advanced environmental chemistry course, the inclusion of semester-long scientific service projects successfully integrated the research process with course content. Each project involved a unique community-based environmental analysis in which students assessed an aspect of environmental health. The projects were due in small pieces at even intervals, and students worked independently or in pairs. Initially, students wrote a project proposal in which they chose and justified a project. Following a literature review of their topic, they drafted sampling and analysis plans using methods in the literature. Samples were collected and analyzed, and all students assembled scientific posters describing the results of their study. In the last week of the semester, the class traveled to a regional professional meeting to present the posters. In all, students found the experience valuable. They learned to be professional environmental chemists and learned the value of the discipline to community health. Students not only learned about their own project in depth, but they were inspired to learn textbook material, not for an exam, but because it helped them understand their own project. Finally, having a community to answer to at the end of the project motivated students to do careful work.
2017-02-15
Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
2015-06-01
sediment control plan during project implementation would be expected to minimize any adverse effects on resident fish species during construction. In... Effective August 8, 2007, under the authority of the Endangered Species Act of 1973, as amended, the U.S. Fish and Wildlife Service (Service) removed...of storm sewer pipe and 122 manholes of the airfield stormwater drainage network. Summary of Anticipated Environmental Effects Associated with the
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
NASA Astrophysics Data System (ADS)
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-07
... and refined analyses of data, producing observational findings, and creating other sources of research... Services announces priorities and definitions for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR...
DOT National Transportation Integrated Search
2016-08-01
This project developed a solid-state welding process based on linear friction welding (LFW) technology. While resistance flash welding or : thermite techniques are tried and true methods for joining rails and performing partial rail replacement repai...
Models of railroad passenger-car requirements in the northeast corridor : volume II user's guide
DOT National Transportation Integrated Search
1976-09-30
Models and techniques for determining passenger-car requirements in railroad service were developed and applied by a research project of which this is the final report. The report is published in two volumes. The solution and analysis of the Northeas...
DOT National Transportation Integrated Search
1976-09-30
Models and techniques for determining passenger-car requirements in railroad service were developed and applied by a research project of which this is the final report. The report is published in two volumes. This volume considers a general problem o...
Alloni, Anna; Lanzola, Giordano; Triulzi, Fabio; Bellazzi, Riccardo; Reni, Gianluigi
2015-08-01
The Colibri project is introduced, whose aim is setting up a shared database of Magnetic Resonance images concerning pediatric patients affected by neurological rare disorders. The project involves 19 Italian centers of excellence in pediatric neuro-radiology and is supported by the nationwide coordinating center for the Information and Communication Technology research infrastructure. After the first year devoted to the design and the implementation, in November 2014 the system finally went into service at the centers involved in the project. This paper illustrates the initial assessment of the user perception and provides some preliminary statistics about its use.
ERIC Educational Resources Information Center
Metropolitan Baltimore Council of AFL-CIO Unions, MD.
The Labor Education Achievement Program (LEAP) exceeded its recruitment and enrollment goal for April 1990 to June 1991. The number of union workers receiving services was 697 in 59 classes at 20 sites. Recruitment success was made possible by the use of the communication networks of the Baltimore AFL-CIO Metropolitan Council of Unions and public…
75 FR 32497 - Marine Mammals; Incidental Take During Specified Activities
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
... of the proposed action is contained in a Final Environmental Assessment (FEA) and Finding of No..., status, distribution, and seasonal distribution of northern sea otters is contained in the FEA, the.... National Environmental Policy Act (NEPA) The applicant provided an FEA on the project. The Service finds...
Profiles of Asians in Sacramento. Final Report.
ERIC Educational Resources Information Center
Lee, Ivy
This project was undertaken to provide more information on the condition of Asians. More specifically, it sought to: (1) obtain descriptive and demographic data on Asians; (2) determine the extent of usage of existing social services. Structural and attitudinal factors which facilitate or inhibit usage were examined; (3) identify what Asians…
Development of Standards for Textiles and Clothing Postsecondary Programs. Final Report.
ERIC Educational Resources Information Center
Iowa State Univ. of Science and Technology, Ames. Dept. of Home Economics Education.
A project was conducted to validate program standards and performance standards for four postsecondary occupational areas--fashion merchandising, fashion design, apparel, and window treatment services. Returns from 117 questionnaires from postsecondary institutions in fifty states were used to develop program standards statements and to provide…
DOT National Transportation Integrated Search
2016-07-01
The durability of delineators should be considered when selecting a product. Looking at the data : gathered in this project, there was a considerable gap between the quality of the top three delineators tested : and the other four. This led the resea...
The Impact of Automation on Libraries. Final Report.
ERIC Educational Resources Information Center
Cline, Hugh F.; Sinnott, Loraine T.
This project examined a series of alternative policies for the management and funding of university libraries as they adopt and adapt to various information science technologies to accomplish the functions of acquisitions, cataloging, circulation, and reference services. Comparative case studies were completed at the University of Chicago,…
Operation Rescue. Final Report.
ERIC Educational Resources Information Center
McKee, Neena; Crawford, Georgette
The Operation Rescue project was designed to develop a classroom setting for the delivery of comprehensive educational services to "at risk" young adolescents. The classroom was established as part of the pre-existing Jonesboro Alternative School, and it utilized the basic academic and social program developed by this entity over 12…
Commercial Baking. Final Report.
ERIC Educational Resources Information Center
Booth, Nancy
A project filmed three commercial baking videotapes for use by secondary and adult students in food service programs. The three topics were basic dinner rolls, bread making, and hard breads and rolls. Quick-rise dough recipes were developed, written down, and explained for use with the videotapes. A pretest, posttest, and student guide were…
Early Outcomes of the GEAR UP Program. Final Report
ERIC Educational Resources Information Center
Standing, Kim; Judkins, David; Keller, Brad; Shimshak, Amy
2008-01-01
In 1998, Congress authorized the Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP) program. The purpose of the program is to foster increased knowledge, expectations, and preparation for postsecondary education among low-income students and their families. GEAR UP projects may provide services to students, parents and…
DOT National Transportation Integrated Search
1994-05-01
This report documents an analysis performed in support of the United States Coast Guard in managing its fleet of construction tenders (WLICs). The project was sponsored by the Coast Guard's Office of Navigation Safety and Waterway Services, Short Ran...
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Nutrition Education and Training Program, 1985-86. Final Evaluation Report.
ERIC Educational Resources Information Center
Guerrero, Frank; Hunt, Daniel M.
The New York City Board of Education's Nutrition Education and Training Program was developed and implemented to improve the quality of nutrition education in elementary schools. The project's primary objectives were to: (1) provide elementary school teachers and food service personnel with enhanced knowledge of sound nutrition; (2) provide…
The perspectives, information and conclusions conveyed in research project abstracts, progress reports, final reports, journal abstracts and journal publications convey the viewpoints of the principal investigator and may not represent the views and policies of ORD and EPA. Concl...
Arlington/Alexandria 1990-1991 REEP Workplace Literacy Training Project. Final Evaluation Report.
ERIC Educational Resources Information Center
Peterson, Morris
As part of the National Workplace Literacy Program, the 1990-1991 Arlington Education and Employment Program (REEP) served 333 functionally illiterate limited English proficient (LEP) adults working in Virginia hotels at entry level jobs in housekeeping, food and beverage service, and maintenance. Training in workplace literacy and…
Disabled Access to Technological Advances (DATA) Final Report.
ERIC Educational Resources Information Center
Cress, Cynthia J.
Disabled Access to Technological Advances (DATA) was a 3-year federally funded project to demonstrate how the application of computer technology can increase the employability of severely disabled persons. Services were provided through the integrated efforts of four agencies in Dane County, Wisconsin: an independent living center, a…
Bio-Engineering Services to the Developmentally Disabled Adolescent. Final Report.
ERIC Educational Resources Information Center
Mallik, Kalisankar; Yuspeh, Sheldon
A 1-year demonstration project involving 24 developmentally disabled students (9- to 20-years-old) with severe physical limitations was conducted to increase their educational and vocational possibilities by using cost-effective bio-engineering techniques to modify their physical environment and develop improved adaptive devices. Phase I of the…
75 FR 11637 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-11
... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-114998-99] Proposed Collection; Comment... comments concerning an existing final regulation, REG-114998-99 (TD 8941), Obligations of States and... Number: REG-114998-99. Abstract: Section 421(f)(4) of the Internal Revenue Code of 1986 permits a person...
DOT National Transportation Integrated Search
2013-06-10
During the funding provided in FY2013, the GTRI developed RPM placement truck was reworked to prepare the truck : for full-time service on Georgia roadways. During this effort, the RPM truck was configured for a certain type of lane : striping th...
Evaluation of introduction scenarios for a broadband access network
NASA Astrophysics Data System (ADS)
Bocker, Geert-Jan; Cuthbert, Laurie; Gobbi, Roberta; Inch, Robert; Sara, Lini
1995-02-01
The provision of broadband services at a reasonable cost to residential and small business customers is one of the major challenges facing operators. The introduction of cost-effective systems considering the existing infrastructure is an important study. Within the RACE project 2024 Broadband Access Facilities, the economic and evolution aspects of different introduction scenarios of a broadband access system suitable for providing these services are investigated. This paper presents the final results of this study.
OA-7 Veggie Series 1 Processing
2017-02-15
Charles Spern, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
The REFINEMENT Glossary of Terms: An International Terminology for Mental Health Systems Assessment.
Montagni, Ilaria; Salvador-Carulla, Luis; Mcdaid, David; Straßmayr, Christa; Endel, Florian; Näätänen, Petri; Kalseth, Jorid; Kalseth, Birgitte; Matosevic, Tihana; Donisi, Valeria; Chevreul, Karine; Prigent, Amélie; Sfectu, Raluca; Pauna, Carmen; Gutiérrez-Colosia, Mencia R; Amaddeo, Francesco; Katschnig, Heinz
2018-03-01
Comparing mental health systems across countries is difficult because of the lack of an agreed upon terminology covering services and related financing issues. Within the European Union project REFINEMENT, international mental health care experts applied an innovative mixed "top-down" and "bottom-up" approach following a multistep design thinking strategy to compile a glossary on mental health systems, using local services as pilots. The final REFINEMENT glossary consisted of 432 terms related to service provision, service utilisation, quality of care and financing. The aim of this study was to describe the iterative process and methodology of developing this glossary.
NASA Astrophysics Data System (ADS)
Gerzen, Tatjana; Wilken, Volker; Hoque, Mainul; Minkwitz, David; Schlueter, Stefan
2016-04-01
The ionosphere is the upper part of the Earth's atmosphere, where sufficient free electrons exist to affect the propagation of radio waves. Therefore, the treatment of the ionosphere is a critical issue for many applications dealing with trans-ionospheric signals such as GNSS positioning, GNSS related augmentation systems (e.g. EGNOS and WAAS) and remote sensing. The European Geostationary Navigation Overlay Service (EGNOS) is the European Satellite Based Augmentation Service (SBAS) that provides value added services, in particular to safety critical GNSS applications, e.g. aviation and maritime traffic. In the frame of the European GNSS Evolution Programme (EGEP), ESA has launched several activities, supporting the design, development and qualification of the operational EGNOS infrastructure and associated services. Ionospheric Reference Scenarios (IRSs) are used by ESA in order to conduct the EGNOS performance simulations and to assure the capability for maintaining accuracy, integrity and availability of the EGNOS system, especially during ionospheric storm conditions. The project Data Assimilation Techniques for Ionospheric Reference Scenarios (DAIS) - aims the provision of improved EGNOS IRSs. The main tasks are the calculation and validation of time series of IRSs by a 3D assimilation approach that combines space borne and ground based GNSS observations as well as ionosonde measurements with an ionospheric background model. The special focus thereby is to demonstrate that space-based measurements can significantly contribute to fill data gaps in GNSS ground networks (particularly in Africa and over the oceans) when generating the IRSs. In this project we selected test periods of perturbed and nominal ionospheric conditions and filtered the collected data for outliers. We defined and developed an applicable technique for the 3D assimilation and applied this technique for the generation of IRSs covering the EGNOS V3 extended service area. Afterwards the generated 3D ionosphere reconstructions as well as the final IRSs are validated with independent GNSS slant TEC (Total Electron Content) data, vertical sounding observations and JASON 1 and 2 derived vertical TEC. This presentation gives an overview about the DAIS project and the achieved results. We outline the assimilation approach, show the reconstruction and the validation results and finally address open questions.
NASA Technical Reports Server (NTRS)
Morgenstern, John; Norstrud, Nicole; Stelmack, Marc; Skoch, Craig
2010-01-01
The N+3 Final Report documents the work and progress made by Lockheed Martin Aeronautics in response to the NASA sponsored program "N+3 NRA Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2030 to 2035 Period." The key technical objective of this effort was to generate promising supersonic concepts for the 2030 to 2035 timeframe and to develop plans for maturing the technologies required to make those concepts a reality. The N+3 program is aligned with NASA's Supersonic Project and is focused on providing alternative system-level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight
Retracted: Design Education in the Global Era
NASA Astrophysics Data System (ADS)
de Lobo, Theresa
The aim of this paper is to show the collaboration of design disciplines to instill a broader sense of design for students through intercultural service learning projects. While there are programs that are reinventing their curriculum, there are still several that follow the classic structure of a first year art foundation program with the final years concentrating on the desired discipline. The interactions at a global scale, has heightened the need for graduates to learn to interact more effectively with people from different cultures. This approach combines the concern of addressing a need for design in a real world situation, with learning how to understand culture, place, and experience through a collaborative project. Referencing a specific international service learning project, and drawing from literature on internationalization of education, this paper explores key concepts, learning objectives, methods, and challenges faced in addressing the need to prepare students for practice in an increasingly integrated workplace.
2017-02-15
Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. At far left is Dena Richmond, ESC configuration management. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.
Public Key-Based Need-to-Know Authorization Engine Final Report CRADA No. TSB-1553-98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark, R.; Williams, R.
The goals of this project were to develop a public key-based authentication service plug-in based on LLNL's requirements, integrate the public key-based authentication with the Intra Verse authorization service adn the LLNL NTK server by developing a full-featured version of the prototyped Intra Verse need-to-know plug in; and to test the authorization and need-to-know plug-in in a secured extranet prototype among selected national Labs.
A regional technology transfer program
NASA Technical Reports Server (NTRS)
1978-01-01
The final report is presented for the North Carolina Science and Technology Research Center's 14th consecutive contract period as a NASA Industrial Applications Center, serving the information needs of nine Southeastern states. Included in the report are figures for and analysis of marketing efforts, file usage, search delivered, and other services performed for clients; and information on staff changes, workshops, and special projects in 1978. An appendix contains copies of NC/STRC magazine advertisements, letters from clients, and supplementary information on NC/STRC staff and services.
Standardizing an End-to-end Accounting Service
NASA Technical Reports Server (NTRS)
Greenberg, Edward; Kazz, Greg
2006-01-01
Currently there are no space system standards available for space agencies to accomplish end-to-end accounting. Such a standard does not exist for spacecraft operations nor for tracing the relationship between the mission planning activities, the command sequences designed to perform those activities, the commands formulated to initiate those activities and the mission data and specifically the mission data products created by those activities. In order for space agencies to cross-support one another for data accountability/data tracing and for inter agency spacecraft to interoperate with each other, an international CCSDS standard for end-to-end data accountability/tracing needs to be developed. We will first describe the end-to-end accounting service model and functionality that supports the service. This model will describe how science plans that are ultimately transformed into commands can be associated with the telemetry products generated as a result of their execution. Moreover, the interaction between end-to-end accounting and service management will be explored. Finally, we will show how the standard end-to-end accounting service can be applied to a real life flight project i.e., the Mars Reconnaissance Orbiter project.
VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.
ERIC Educational Resources Information Center
Baldus, Lorayne; Nelson, Orville
The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…
ERIC Educational Resources Information Center
Snedeker, David M.
Evaluative information is provided on 18 completed workplace literacy classes conducted in the Seattle-King County, Washington, area for 218 limited English proficient workers. The programs were operated by the Employment Opportunities Center and the Refugee Service Federation. Participants were members of the following ethnic groups: Vietnamese,…
Supplementary Materials for State Penitentiary Library Project. Final Performance Report.
ERIC Educational Resources Information Center
Hull, Jane A.
This report describes how a Library Services and Construction Act (LSCA) Title VI Library Literacy Program grant was used to improve the literacy and coping skills of illiterate and functionally illiterate inmates incarcerated at the Mississippi State Penitentiary. A second objective of this literacy program was to produce an annotated…
Design of a Personnel and Training Information System for Educational R&D Personnel. Final Report.
ERIC Educational Resources Information Center
Hood, Paul D.; McCutchan, Nancy A.
The primary objective of this project was to design a system to provide information services that would fulfill the information requirements of federal planners, instructional material developers, training program directors and instructors, students, interns, employers, and practitioners concerned with problems relating to personnel and training…
Youth Serving the Community: Realistic Public Service Roles for Young Workers. Final Report.
ERIC Educational Resources Information Center
National Child Labor Committee, New York, NY.
This report on youth employment programs is intended to help prime sponsors and program operators implement innovative youth employment efforts under the Comprehensive Employment and Training Act (CETA) and the Youth Employment and Demonstration Project Act (YEDPA). The content is in two chapters. Chapter 1 covers the introduction, meeting…
Small Business Innovative Research (SBIR) Literacy Project Phase I. Final Report.
ERIC Educational Resources Information Center
Comsis Corp., Silver Spring, MD.
An assessment of the information needs of providers of literacy services examined whether these needs could be met through an electronic information and communications system (EICS). The needs assessment was sent to 300 literacy providers; 134 responded. Responses indicated that literacy providers would benefit from a central, easily accessible…
Comprehensive Russian Instructional Program, 1983-1984: OEA Evaluation Report.
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn. Office of Educational Assessment.
In 1983-84, the second and final year of funding, Project CRIP (Comprehensive Russian Instructional Program) provided career orientation and support services to 430 Russian-speaking student of limited English proficiency (LEP) at three public and four private high schools in Brooklyn and Queens, New York. All of the students were foreign-born and…
76 FR 17991 - Proposed Collection; Comment Request for Regulation Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-31
... consideration. ADDRESSES: Direct all written comments to Yvette B. Lawrence, Internal Revenue Service, room 6129.... Yvette B. Lawrence, IRS Reports Clearance Officer. [FR Doc. 2011-7524 Filed 3-30-11; 8:45 am] BILLING... comments concerning an existing final regulation, T.D. 8706, Electronic Filing of Form W-4 (Sec. 31.3402(f...
Basic Skills and Job Retention. Final Report.
ERIC Educational Resources Information Center
Seminole Community Coll., Sanford, FL.
A project developed an educational model to deliver academic remediation services to small businesses at a cost-effective rate by using a lead instructor and volunteer assistants. The first step was planning and implementing the tutor training segment. The class and accompanying manual were developed, and tutors were identified and trained in a…
Evaluation of the Refugee Targeted Assistance Grants Program: Phase I, Final Report.
ERIC Educational Resources Information Center
Cichon, Donald; And Others
This report presents findings of the first phase of an evaluation of the Targeted Assistance Program (TAP), A Federal program which funds services and projects that assist refugees in attaining economic self-sufficiency and reduced dependency upon public assistance. Following an executive summary and other materials, the report is divided into…
ERIC Educational Resources Information Center
Smyth, Carol B.; Grannell, Dorothy S.; Moore, Miriam
The Literacy Resource Center project, a program of the Wayne Township Public Library also known as the Morrisson-Reeves Library (Richmond, Indiana), involved recruitment, retention, coalition building, public awareness, training, basic literacy, collection development, tutoring, computer-assisted, other technology, employment oriented,…
ERIC Educational Resources Information Center
LaDuke, Caryl
The Adult Reading Program, a project of the Mesa County Public Library District (Grand Junction, Colorado), involved recruitment, retention, coalition building, public awareness, training, rural oriented, basic literacy, collection development, tutoring, employment oriented, intergenerational/family, and English as a Second Language (ESL)…
Criterion-Referenced Item Banking in Electronics: Appendix G. Final Report.
ERIC Educational Resources Information Center
Gorth, William Phillip; Swaminathan, Hariharan
This is one of the outcomes of the work of the Massachusetts Evaluation Service Center for Occupational Education (ESCOE). After an overview of the Performance Test Development Project, a summary of the major products and byproducts is presented. The major products are: (1) a set of clearly defined, well-structured, and consistent behavioral…
This report provides a summary of three of our research projects: 1) an evaluation of the quality of scientific evidence associating green spaces with health benefits, along with ensuing research in San Juan, Puerto Rico; 2) a Health Impact Assessment of a Long Island sewering pi...
Demonstration of Cataloging Support Services and Marc II Conversion. Final Report.
ERIC Educational Resources Information Center
Buckland, Lawrence F.; And Others
Beginning in December, 1967, the New England Library Information Network (NELINET) was demonstrated in actual operation using Machine-Readable Cataloging (MARC I) bibliographic data. Section 1 of this report is an introduction and summary of the project. Section 2 described the library processing function demonstrated which included catalog card…
ERIC Educational Resources Information Center
Dillon, Martin; And Others
The Online Computer Library Center Internet Resource project focused on the nature of electronic textual information available through remote access using the Internet and the problems associated with creating machine-readable cataloging (MARC) records for these objects using current USMARC format for computer files and "Anglo-American…
Bilingualism in the Computer Age 1988-89. OREA Evaluation Section Report.
ERIC Educational Resources Information Center
Berney, Tomi D.; Alvarez, Rosalyn
In the 1988-89 school year, Bilingualism in the Computer Age completed its final year of instruction at Morris High School in the Bronx. The project provided bilingual instructional and support services to 240 Spanish-speaking students of limited English proficiency (LEP) and utilized computers to develop students' English skills and native…
High Technology Technical Training Needs Assessment. Final Report 1983-84.
ERIC Educational Resources Information Center
Middlesex County Coll., Edison, NJ.
A project sought to produce adequate data on high technology training needs in New Jersey's Middlesex County College's service area. Of 168 individuals at high technology companies who were sent surveys, 52 returned usable surveys. Respondents supplied information on the impact of high technology on the company over the next five years, the…
75 FR 39168 - Special Regulations; Areas of the National Park System
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... his death in 1972. During the closure, we completed four projects: installation of a new HVAC system... to either bulge or crack. The existing HVAC system installed in 1985 failed to maintain a stable...; Areas of the National Park System AGENCY: National Park Service. ACTION: Final Rule. SUMMARY: The...
76 FR 18151 - Kootenai National Forest, Lincoln County, MT; Miller West Fisher Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... proposed action, the Draft EIS and the Final EIS, and the Forest Service is not inviting comments at this...: Contact Leslie McDougall, Team Leader, Three Rivers Ranger District, at (406) 295-4693. SUPPLEMENTARY...; implementation of best management practices (BMPs) and road maintenance work will be applied to approximately 38...
ERIC Educational Resources Information Center
Morgan, Robert P.; Eastwood, Lester F., Jr.
Research on this National Science Foundation grant to study the application of modern communications technology to educational networking was divided into three parts: assessment of the role of technology in non-traditional post-secondary education; assessment of communications technologies and educational services of current or potential future…
ERIC Educational Resources Information Center
Cheatum, Billye Ann
This federally funded project's goals were to provide a competency-based training program that would enable Western Michigan University graduate and undergraduate students to meet Michigan's endorsement requirements for teaching physical education to handicapped individuals, and to provide direct services to handicapped children in the Kalamazoo…
Manatee County Displaced Homemakers Program. Final Report from July 1, 1983 to August 31, 1984.
ERIC Educational Resources Information Center
Joynes, Margot
In the Displaced Homemaker project at the New Options Center in Manatee County, Bradenton, Florida, clients were displaced homemakers, single household heads needing training, homemakers seeking full-time employment, and anyone interested in jobs or training nontraditional to his/her sex. Various outreach methods--public service announcements,…
Low-cost silicon solar array project environmental hail model for assessing risk to solar collectors
NASA Technical Reports Server (NTRS)
Gonzalez, C.
1977-01-01
The probability of solar arrays being struck by hailstones of various sizes as a function of geographic location and service life was assessed. The study complements parallel studies of solar array sensitivity to hail damage, the final objective being an estimate of the most cost effective level for solar array hail protection.
Transition, Retraining, and Change for Entry. Final Report from July 1, 1983 - August 31, 1984.
ERIC Educational Resources Information Center
VanderLugt, Marilyn J.
Goals of the "Transition, Retraining, and Change for Entry" project were to provide counseling and/or group support for single heads of households or persons entering nontraditional employment and to provide placement services for the target group. A third goal was to disseminate information about the value of and opportunities in…
Ralphs Grocery EC-Diesel Truck Fleet: Final Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2003-02-01
DOE's Office of Heavy Vehicle Technologies sponsored a research project with Ralphs Grocery Company to collect and analyze data on the performance and operation of 15 diesel trucks fueled with EC-Diesel in commercial service. These trucks were compared to 5 diesel trucks fueled with CARB diesel and operating on similar routes. This document reports this evaluation.
ERIC Educational Resources Information Center
Maryland Univ., College Park.
A project was designed to develop and validate a model for inservice education which could reach a large number of elementary school teachers. The thesis explored was whether this research, development, dissemination, and implementation could be effectively accomplished through the pooled competencies of a university-based staff, a state education…
ERIC Educational Resources Information Center
Baldus, Lorayne
A staff development program on gender equity was conducted for personnel in Wisconsin's technical colleges using the train-the-trainer method. The training took two approaches: a class for college personnel and career challenge training for project directors of single parent and displaced homemaker grants. The inservice class resulted in increased…
Hospital Job Skills Enhancement Program: A Workplace Literacy Project. Final Evaluation Report.
ERIC Educational Resources Information Center
Nurss, Joanne R.
A workplace literacy program was designed to improve the literacy skills of entry-level workers in the housekeeping, food service, and laundry departments of Grady Memorial Hospital in Atlanta. Classes were held twice per week for 36 weeks at the hospital on job time. Literacy was defined as reading, writing, oral communication, and problem…
New Choices for the Displaced Homemaker in Vocational Education. Final Report from 7/1/83 - 8/31/84.
ERIC Educational Resources Information Center
Armstrong, Jan
The New Choices for the Displaced Homemaker in Vocational Education project was aimed at developing skills and providing training for employment to meet the displaced homemaker's need for financial support while simultaneously offering services to aid in her emotional development. Objectives were to provide opportunities for the displaced…
ERIC Educational Resources Information Center
Richardson, Donald L.; And Others
The project was designed to provide vocational teacher educators in Colorado with an alternative delivery system for inservice vocational teacher education which would overcome barriers of distance (and difficult winter travel), expense, and low student density. A task force composed of staff members of the State Board for Community Colleges and…
ERIC Educational Resources Information Center
Morgan, Jim
A toll-free adult education information and referral hotline provided information and referral services to approximately 1500 adults in Region IX in Texas from September 1980 to June 1981. Adult education co-ops and testing centers forwarded pertinent program information (class schedules, General Educational Development testing information) to the…
Toward High Quality Family Day Care for Infants and Toddlers. Final Report.
ERIC Educational Resources Information Center
Rauch, Marian D.; Crowell, Doris C.
Reported were the results of a project which established a cluster of family day care homes in Hawaii in which caregivers were selected, trained, and provided with supportive services and salaries. The primary objective of the program was to provide a replicable, high quality program for preschool children that would maximize social, emotional,…
Social Networks and the Desire to Save Face: A Case from Singapore
ERIC Educational Resources Information Center
Netzley, Michael A.; Rath, Akanksha
2012-01-01
For 5 years, corporate communication undergraduates have maintained a wiki as a final course and community service project. Using Web 2.0 platforms to crowdsource and curate content, they learn to employ online communications for work purposes. When the course was launched in 2007, the dominant social media narrative invited educators to embrace a…
Personalizing knowledge delivery services: a conceptual framework
NASA Technical Reports Server (NTRS)
Majchrzak, Ann; Chelleppa, Ramnath K.; Cooper, Lynne P.; Hars, Alexander
2003-01-01
Consistent with the call of the Minnesota Symposium for new theory in knowledge management, we offer a new conceptualization of Knowledge Management Systems (KMS) as a portfolio of personalized knowledge delivery services. Borrowing from research on online consumer behavior, we describe the challenges imposed by personalized knowledge delivery services, and suggest design parameters that can help to overcome these challenges. We develop our design constructs through a set of hypotheses and discuss the research implications of our new conceptualization. Finally, we describe practical implications suggested by our conceptualization - practical suggestions that we hope to gain some experience with as part of an ongoing action research project at our partner organization.
DE-FG02-04ER25606 Identity Federation and Policy Management Guide: Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Humphrey, Marty, A
The goal of this 3-year project was to facilitate a more productive dynamic matching between resource providers and resource consumers in Grid environments by explicitly specifying policies. There were broadly two problems being addressed by this project. First, there was a lack of an Open Grid Services Architecture (OGSA)-compliant mechanism for expressing, storing and retrieving user policies and Virtual Organization (VO) policies. Second, there was a lack of tools to resolve and enforce policies in the Open Services Grid Architecture. To address these problems, our overall approach in this project was to make all policies explicit (e.g., virtual organization policies,more » resource provider policies, resource consumer policies), thereby facilitating policy matching and policy negotiation. Policies defined on a per-user basis were created, held, and updated in MyPolMan, thereby providing a Grid user to centralize (where appropriate) and manage his/her policies. Organizationally, the corresponding service was VOPolMan, in which the policies of the Virtual Organization are expressed, managed, and dynamically consulted. Overall, we successfully defined, prototyped, and evaluated policy-based resource management and access control for OGSA-based Grids. This DOE project partially supported 17 peer-reviewed publications on a number of different topics: General security for Grids, credential management, Web services/OGSA/OGSI, policy-based grid authorization (for remote execution and for access to information), policy-directed Grid data movement/placement, policies for large-scale virtual organizations, and large-scale policy-aware grid architectures. In addition to supporting the PI, this project partially supported the training of 5 PhD students.« less
Irradiation disinfestation of dried fruits and nuts. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rhodes, A.A.
This collection of research papers is the result of a research project which examined the technical and economic feasibility of irradiation as a means of disinfesting dried fruits and nuts of postharvest insects. The project was overseen by representatives from the United States Department of Agriculture, the United States Department of Energy, the University of California, CH2M HILL, and the dried fruit and nut industry. The actual research was undertaken by the Agricultural Research Service and the Economic Research Service of the United States Department of Agriculture, the University of California, Riverside, and CH2M HILL. The papers themselves represent themore » work of their authors and each paper is itself a complete entity. The individual papers were abstracted and indexed for the database.« less
ICT services for active ageing and independent living: identification and assessment.
Christophorou, Christophoros; Kleanthous, Styliani; Georgiadis, Dimosthenis; Cereghetti, Donato M; Andreou, Panayiotis; Wings, Cindy; Christodoulou, Eleni; Samaras, George
2016-09-01
Based on the demographic changes and the rapid increase of older population in Europe, major challenges are expected to rise, both in the economy as well as the society, whether the dominant care model for supporting elderly in living independently at home continues to rely on informal and formal caregivers' assistance. To respond to the above challenges, assistive technologies are called to develop Information and Communication Technology (ICT) services for supporting seniors to remain active and independent, for as long as possible, in their chosen home environment. The work described in this Letter is based on the Miraculous-Life project and it emphasises the identification and assessment of a set of services that an ICT system for Ageing Well should support, in an actual end-users setting. The outcome of this work may inform fellow researchers and other projects in the area of Ageing Well in: (i) understanding which ICT services can be the most valuable for end-users' Quality of Life, (ii) prioritising the development of related ICT services and (iii) facilitating better recourse allocation in order to reduce any risks associated to implementation failures of these services within their respective projects. A final trial phase is planned, aiming to validate the Miraculous Life prototype longitudinally in a naturalistic environment with a larger sample size. During this trial, it will be investigated if perceived usefulness, satisfaction and motivation could be predicted by sociodemographic variables and personality.
Support of an Active Science Project by a Large Information System: Lessons for the EOS Era
NASA Technical Reports Server (NTRS)
Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.
1993-01-01
The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.
The BCube Crawler: Web Scale Data and Service Discovery for EarthCube.
NASA Astrophysics Data System (ADS)
Lopez, L. A.; Khalsa, S. J. S.; Duerr, R.; Tayachow, A.; Mingo, E.
2014-12-01
Web-crawling, a core component of the NSF-funded BCube project, is researching and applying the use of big data technologies to find and characterize different types of web services, catalog interfaces, and data feeds such as the ESIP OpenSearch, OGC W*S, THREDDS, and OAI-PMH that describe or provide access to scientific datasets. Given the scale of the Internet, which challenges even large search providers such as Google, the BCube plan for discovering these web accessible services is to subdivide the problem into three smaller, more tractable issues. The first, to be able to discover likely sites where relevant data and data services might be found, the second, to be able to deeply crawl the sites discovered to find any data and services which might be present. Lastly, to leverage the use of semantic technologies to characterize the services and data found, and to filter out everything but those relevant to the geosciences. To address the first two challenges BCube uses an adapted version of Apache Nutch (which originated Hadoop), a web scale crawler, and Amazon's ElasticMapReduce service for flexibility and cost effectiveness. For characterization of the services found, BCube is examining existing web service ontologies for their applicability to our needs and will re-use and/or extend these in order to query for services with specific well-defined characteristics in scientific datasets such as the use of geospatial namespaces. The original proposal for the crawler won a grant from Amazon's academic program, which allowed us to become operational; we successfully tested the Bcube Crawler at web scale obtaining a significant corpus, sizeable enough to enable work on characterization of the services and data found. There is still plenty of work to be done, doing "smart crawls" by managing the frontier, developing and enhancing our scoring algorithms and fully implementing the semantic characterization technologies. We describe the current status of the project, our successes and issues encountered. The final goal of the BCube crawler project is to provide relevant data services to other projects on the EarthCube stack and third party partners so they can be brokered and used by a wider scientific community.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walker, A.
2013-06-01
Frito Lay North America (FLNA) requires technical assistance for the evaluation and implementation of renewable energy and energy efficiency projects in production facilities and distribution centers across North America. Services provided by NREL do not compete with those available in the private sector, but rather provide FLNA with expertise to create opportunities for the private sector renewable/efficiency industries and to inform FLNA decision making regarding cost-effective projects. Services include: identifying the most cost-effective project locations based on renewable energy resource data, utility data, incentives and other parameters affecting projects; assistance with feasibility studies; procurement specifications; design reviews; and other servicesmore » to support FNLA in improving resource efficiency at facilities. This Cooperative Research and Development Agreement (CRADA) establishes the terms and conditions under which FLNA may access capabilities unique to the laboratory and required by FLNA. Each subsequent task issued under this umbrella agreement would include a scope-of-work, budget, schedule, and provisions for intellectual property specific to that task.« less
Modifying the Heliophysics Data Policy to Better Enable Heliophysics Research
NASA Technical Reports Server (NTRS)
Hayes, Jeffrey; Roberts, D. Aaron; Bredekamp, Joseph
2008-01-01
The Heliophysics (HP) Science Data Management Policy, adopted by HP in June 2007, has helped to provide a structure for the HP data lifecycle. It provides guidelines for Project Data Management Plans and related documents, initiates Resident Archives to maintain data services after a mission ends, and outlines a route to the unification of data finding, access, and distribution through Virtual observatories. Recently we have filled in missing pieces that assure more coherence and a home for the VxOs (through the 'Heliophsyics Data and Model Consortium'), and provide greater clarity with respect to long term archiving. In particular, the new policy which has been vetted with many community members, details the 'Final Archives' that are to provide long-term data access. These are distinguished from RAs in that they provide little additional service beyond servicing data, but critical to their success is that the final archival materials include calibrated data in useful formats such as one finds in CDAWeb and various ASCII or FITS archives. Having a clear goal for legacy products, to be detailed as part of the Mission Archives Plans presented at Senior Reviews, will help to avoid the situation so common in the past of having archival products that preserve bits well but not readily usable information. We hope to avoid the need for the large numbers of 'data upgrade' projects that have been necessary in recent years.
The Queued Service Observing Project at CFHT
NASA Astrophysics Data System (ADS)
Martin, Pierre; Savalle, Renaud; Vermeulen, Tom; Shapiro, Joshua N.
2002-12-01
In order to maximize the scientific productivity of the CFH12K mosaic wide-field imager (and soon MegaCam), the Queued Service Observing (QSO) mode was implemented at the Canada-France-Hawaii Telescope at the beginning of 2001. The QSO system consists of an ensemble of software components allowing for the submission of programs, the preparation of queues, and finally the execution and evaluation of observations. The QSO project is part of a broader system known as the New Observing Process (NOP). This system includes data acquisition, data reduction and analysis through a pipeline named Elixir, and a data archiving and distribution component (DADS). In this paper, we review several technical and operational aspects of the QSO project. In particular, we present our strategy, technical architecture, program submission system, and the tools developed for the preparation and execution of the queues. Our successful experience of over 150 nights of QSO operations is also discussed along with the future plans for queue observing with MegaCam and other instruments at CFHT.
NASA Astrophysics Data System (ADS)
Loeffler, U.; Weible, H.
1981-08-01
The final energy demand for the Federal Republic of Germany was calculated. The model MEDEE-2 describes, in relationship to a given distribution of the production of single industrial sectors, of energy specific values and of population development, the final energy consumption of the domestic, service industry and transportation sectors for a given region. The input data, consisting of constants and variables, and the proceeding, by which the projections for the input data of single sectors are performed, are discussed. The results of the calculations are presented and are compared. The sensitivity of single results in relation to the variation of input values is analyzed.
2013-06-11
The Assistant Secretary for Special Education and Rehabilitative Services announces priorities under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce priorities for a Rehabilitation Engineering Research Center (RERC) on Rehabilitation Strategies, Techniques, and Interventions (Priority 1), Information and Communication Technologies Access (Priority 2), Individual Mobility and Manipulation (Priority 3), and Physical Access and Transportation (Priority 4). The Assistant Secretary may use one or more of these priorities for competitions in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend these priorities to improve community living and participation, health and function, and employment outcomes of individuals with disabilities.
NASA Technical Reports Server (NTRS)
Hall, Edward; Magner, James
2011-01-01
This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II (this document) describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.
30 CFR 250.911 - If my platform is subject to the Platform Verification Program, what must I do?
Code of Federal Regulations, 2010 CFR
2010-07-01
... a project management timeline, Gantt Chart, that depicts when interim and final reports required by... 30 Mineral Resources 2 2010-07-01 2010-07-01 false If my platform is subject to the Platform Verification Program, what must I do? 250.911 Section 250.911 Mineral Resources MINERALS MANAGEMENT SERVICE...
ERIC Educational Resources Information Center
Hutchison, Mary Ann; And Others
The Mental Health Prevention/Intervention Project (MHP/IP) was designed to provide and assess comprehensive and effective mental health services to Head Start children, parents, families, and staff. Sponsored by the Latin American Civic Association (LACA) in Los Angeles, the 14-month intervention was implemented and assessed on three levels: (1)…
ERIC Educational Resources Information Center
Peter, Richard; Gebhart, Richard
Many new vocational, technical, and adult education (VTAE) teachers have never taught before and perhaps have never taken a professional education course. The Wisconsin Board of VTAE has developed a spiral curriculum for new VTAE teachers, designed to aquaint them with basic procedures for planning and presenting a lesson, supervising student…
ERIC Educational Resources Information Center
Harper, Jane; Lively, Madeleine
In summer 1988, Tarrant County Junior College, Northeast Campus, conducted a series of eight 16-hour workshops and three 32-hour workshops for high school teachers of foreign languages. The workshops were intended primarily as in-service training to help foreign language teachers: (1) improve their oral proficiency in the language they teach; (2)…
This report summarizes findings of a three-year field study of mercury in freshwater lakes of Vermont and New Hampshire. The study was undertaken jointly by the Vermont Department of Environmental Conservation, New Hampshire Department of Environmental Services, and Syracuse Univ...
ERIC Educational Resources Information Center
Zink, Theodore M.
This study was intended as a follow-up evaluation of Project COPE, a Glassboro State College program designed to provide junior year elementary education students experience in teaching culturally disadvantaged children, and to motivate them to continue this type of teaching after graduation. The procedure involved testing and collecting survey…
Dissemination of School Finance Services in Urban School Districts. Final Report.
ERIC Educational Resources Information Center
Goertz, Margaret E.
The project described in this paper was designed to test specific ways of improving the dissemination of school finance information in two big city school districts (St. Louis and Kansas City, Missouri), in order to enable them to compete more effectively for State aid. Part I presents the political and fiscal environment in which Kansas City and…
ERIC Educational Resources Information Center
Dejonckheere, J.; Ramioul, M.; Van Hootegem, G.
This report addresses small and medium-sized enterprises' (SMEs') role in the changing international division of labor and trade in information service activities. Chapter 2 describes the EMERGENCE project to map and measure eWork. Chapter 3 reviews literature that shows SMEs account for the overwhelming majority of companies and make a crucial…
ERIC Educational Resources Information Center
Peterson, Elaine; Carr, Mary M.
Three colleges in the state of Washington--Gonzaga College (Crosby Library), Whitworth College, and Eastern Washington University--received grants from the Fred Meyer Charitable Trust and the Library Services and Construction Act to facilitate coordinated collection development in the areas of education and business/economics, so that their…
From Constructs to Measures: Finalizing the Common Core. The Project on State-Level Child Outcomes.
ERIC Educational Resources Information Center
Child Trends, Inc., Washington, DC.
The U.S. Department of Health and Human Services' Office of Planning, Research, and Evaluation at the Administration for Children and Families, and the Office of the Assistant Secretary for Planning and Evaluation, are working together with states and other groups to improve the measurement of child outcomes in state welfare evaluations and in…
Development and Implementation of a Comprehensive Health and Nutrition Record. Final Report.
ERIC Educational Resources Information Center
Ingalls, Dorothy M.
The objectives of this project were: (1) to determine the items necessary for a comprehensive Health and Nutrition Record to be sent to the public and parochial schools from selected preschool day care servicing agencies; (2) to design an instrument on which to record the necessary health and nutrition data; (3) to determine ways of channeling…
ERIC Educational Resources Information Center
Catholic Social Services, Harrisburg, PA.
The primary goal of a multi-purpose project was to utilize both Literacy Volunteers of America (LVA) and Laubach Literacy Action (LLA) in training volunteers to teach English to refugees. Catholic Social Services trained 163 volunteers who were placed in adult basic education (ABE) classes, small group instruction settings, and one-to-one tutoring…
ERIC Educational Resources Information Center
Martin, Ruth E.; Hoover, Linda C.
This report, organized into two parts, presents the needs assessment study conducted for the state of Texas. The first section describes Phase One of the study which identified the goals and criteria pertaining to each of the NET target populations, namely: children, parents, educators, food service personnel, and administrators. The second part…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weber, E.R.
1980-07-01
This specification defines the system and subsystem characteristics, design requirements, and system environmental requirements for the Saguaro Power Plant Solar Repowering Project. This project involves the solar repowering of all (120.2 MWe gross) of the 115 MWe net power No. One steam-Rankine unit of the Arizona Public Service Company's Saguaro station. The receiver heat transport fluid is draw salt (60% sodium nitrate and 40% potassium nitrate) that is also used to provide 3.8 hours of sensible heat thermal energy storage. The quad-cavity type receiver is mounted on a tower within a single surrounding collector field of 10,500 second generation heliostats.
Landlord project multi-year program plan, fiscal year 1999, WBS 1.5
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dallas, M.D.
The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less
Ancillary Service Revenue Potential for Geothermal Generators in California FY15 Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edmunds, T; Sotorrio, P
2015-04-16
Achieving California’s 33% renewable generation goal will substantially increase uncertainty and variability in grid operations. Geothermal power plant operators could mitigate this variability and uncertainty by operating plants in a more flexible mode. Plant operators would be compensated for flexibility through payments for ancillary services such as frequency regulation, load following, and spinning reserve. This study explores economic incentives for geothermal plant operators to provide such flexibility. Historical and forecast ancillary service prices are compared to operator compensation for energy under firm contracts at fixed prices, which are higher than current or year 2020 projected market clearing prices for ancillarymore » services in most hours of the year. Power purchase agreements recently executed by geothermal operators typically provide only energy payments at fixed energy prices and escalation rates. We postulate new contract structures that would allow a geothermal plant operator to switch from providing energy to providing ancillary services to the grid operator when it is advantageous to the plant operator to do so. Additional revenues would be earned through ancillary service payments. Estimates of these additional annual revenues a plant operator could realize are developed for a range of contract energy prices. The impacts of flexible operations on reservoir lifetimes and implications for project finance are also discussed.« less
Building a community-academic partnership to improve health outcomes in an underserved community.
McCann, Eileen
2010-01-01
East Garfield Park, IL, is an impoverished community with 59.7% of residents falling below twice the poverty level and 42.6% of its children in poverty. In 2001, the leading causes of hospitalizations were heart disease (10.3%), diabetes (2%), and asthma (3.9%), all of which occur at frequencies 33% greater than the Chicago average. Finally, a review of the health care facilities in the community suggests that there is a need for accessible primary health care services in the area. The purpose of this project was to improve health outcomes in an impoverished, underserved community with documented health care needs and lack of adequate health care services by creating a community-academic partnership to provide on-site, interdisciplinary, health care services within an established and trusted community-based social service agency, Marillac House. The short-term objectives for this project included creating a community-academic partnership between Marillac House and Colleges of Nursing, Medicine, and Health Sciences; providing comprehensive health care services; and developing an innovative clinical education model for interdisciplinary care across specialties. Long-term objectives included providing preventative services; evidenced-based management of acute and chronic illness; evaluating client's health outcomes; and creating a sustainability plan for the long-term success of the health center.
Spaceflight Operations Services Grid (SOSG)
NASA Technical Reports Server (NTRS)
Bradford, Robert N.; Thigpen, William W.
2004-01-01
In an effort to adapt existing space flight operations services to new emerging Grid technologies we are developing a Grid-based prototype space flight operations Grid. This prototype is based on the operational services being provided to the International Space Station's Payload operations located at the Marshall Space Flight Center, Alabama. The prototype services will be Grid or Web enabled and provided to four user communities through portal technology. Users will have the opportunity to assess the value and feasibility of Grid technologies to their specific areas or disciplines. In this presentation descriptions of the prototype development, User-based services, Grid-based services and status of the project will be presented. Expected benefits, findings and observations (if any) to date will also be discussed. The focus of the presentation will be on the project in general, status to date and future plans. The End-use services to be included in the prototype are voice, video, telemetry, commanding, collaboration tools and visualization among others. Security is addressed throughout the project and is being designed into the Grid technologies and standards development. The project is divided into three phases. Phase One establishes the baseline User-based services required for space flight operations listed above. Phase Two involves applying Gridlweb technologies to the User-based services and development of portals for access by users. Phase Three will allow NASA and end users to evaluate the services and determine the future of the technology as applied to space flight operational services. Although, Phase One, which includes the development of the quasi-operational User-based services of the prototype, development will be completed by March 2004, the application of Grid technologies to these services will have just begun. We will provide status of the Grid technologies to the individual User-based services. This effort will result in an extensible environment that incorporates existing and new spaceflight services into a standards-based framework providing current and future NASA programs with cost savings and new and evolvable methods to conduct science. This project will demonstrate how the use of new programming paradigms such as web and grid services can provide three significant benefits to the cost-effective delivery of spaceflight services. They will enable applications to operate more efficiently by being able to utilize pooled resources. They will also permit the reuse of common services to rapidly construct new and more powerful applications. Finally they will permit easy and secure access to services via a combination of grid and portal technology by a distributed user community consisting of NASA operations centers, scientists, the educational community and even the general population as outreach. The approach will be to deploy existing mission support applications such as the Telescience Resource Kit (TReK) and new applications under development, such as the Grid Video Distribution System (GViDS), together with existing grid applications and services such as high-performance computing and visualization services provided by NASA s Information Power Grid (IPG) in the MSFC s Payload Operations Integration Center (POIC) HOSC Annex. Once the initial applications have been moved to the grid, a process will begin to apply the new programming paradigms to integrate them where possible. For example, with GViDS, instead of viewing the Distribution service as an application that must run on a single node, the new approach is to build it such that it can be dispatched across a pool of resources in response to dynamic loads. To make this a reality, reusable services will be critical, such as a brokering service to locate appropriate resource within the pool. This brokering service can then be used by other applications such as the TReK. To expand further, if the GViDS application is constructed using a services-based mel, then other applications such as the Video Auditorium can then use GViDS as a service to easily incorporate these video streams into a collaborative conference. Finally, as these applications are re-factored into this new services-based paradigm, the construction of portals to integrate them will be a simple process. As a result, portals can be tailored to meet the requirements of specific user communities.
1993-07-28
Below is a summary of Vanderbilt’s response, requested by Health Services Command ( HSC ), to the final report prepared by the Directorate of Health Care...Command’s ( HSC ) demands for client data it sought to use somehow in power analysis (see Appendix F). Dr. Kapadia’s statement is the standard view held...not involve actual data, the results from this method may be entirely misleading and not accurate." When HSC demanded client data for power analysis in
Kennedy, Susan
2016-01-01
Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923
Kennedy, Susan
2016-01-01
Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.
Earth Systems Field Work: Service Learning at Local and Global Scales
NASA Astrophysics Data System (ADS)
Moore, A.; Derry, L. A.
2016-12-01
The Earth & Environmental Systems (EES) Field Program engages students in hands-on exploration along the boundaries of the living earth, solid earth, ocean, and atmosphere. Based on Hawaíi Island, the semester-length program integrates scientific study with environmental stewardship and service learning. Each year EES students contribute 3000 hours of service to their host community. Throughout the semester students engage in different service activities. Most courses includes a service component - for example - study of the role of invasive species in native ecosystems includes an invasive species removal project. Each student completes a 4-week service internship with a local school, NGO, state or federal agency. Finally, the student group works to offset the carbon footprint of the program in collaboration with local conservation projects. This effort sequesters CO2 emissions while at the same time contributing to reforestation of degraded native ecosystems. Students learn that expertise is not confined to "the academy," and that wisdom and inspiration can be found in unexpected venues. Much of the service learning in the EES Program occurs in collaboration with local partners. Service internships require students to identify a partner and to design a tractable project. Students work daily with their sponsor and make a formal presentation of their project at the end of the internship period. This includes speaking to a non-technical community gathering as well as to a scientific audience. For many students the opportunity to work on a real problem, of interest in the real world, is a highlight of the semester. Beyond working in support of local community groups, the EES Prograḿs C-neutral project engages students with work in service to the global commons. Here the outcome is not measurable within the time frame of a semester, yet the intangible result makes the experience even more powerful. Students take responsibility for an important issue that is not quantified in terms of an end-of-semester grade and without feedback from the academic or local community. By working through the process of calculating and offsetting their carbon footprint - entirely with their own labor - students learn that every individual has the tools and the ability to create change, and that they have the responsibility to do so.
THE FUEL ELEMENT GRAPHITE. Project DRAGON.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graham, L.W.; Price, M.S.T.
1963-01-15
The main requirements of a fuel element graphite for reactors based on the Dragon concept are low transmission coefficient for fission products, dimensional stability under service conditions, high strength, high thermal conductivity, high purity, and high resistance to oxidation. Since conclusions reached in early 1960, a considerable amount of information has accumulated concerning the likely behaviour of graphites in high temperature reactor systems, particularly data on dimensional stability under irradiation. The influence of this new knowledge on the development of fuel element graphite with the Dragon Project is discussed in detail in the final section of this paper.
Developing quality indicators for community services: the case of district nursing.
Davies, Philippa; Wye, Lesley; Horrocks, Sue; Salisbury, Chris; Sharp, Debbie
2011-01-01
Quality indicators exist for the acute and primary care sectors in the National Health Service (NHS), but until recently little attention has been given to measuring the quality of community services. The innovative project described in this paper attempted to address that gap. To produce a framework for developing quality indicators for Bristol Community Health services. To develop a set of initial indicators for Bristol Community Health services using the proposed framework. After familiarising ourselves with community services and NHS policy, gathering the views of stakeholders and consulting the literature on quality indicators, we designed a framework for indicator development, using the 'test' case of the district nursing service. The long list of possible indicators came from best practice guidelines for wound, diabetes and end of life care, the three conditions most commonly treated by district nurses. To narrow down this list we surveyed and held workshops with district nurses, interviewed service users by telephone and met with commissioners and senior community health managers. The final set of quality indicators for district nurses included 23 organisational and clinical process and outcome indicators and eight patient experience indicators. These indicators are now being piloted, together with two potential tools identified to capture patient reported outcomes. Developing quality indicators for community services is time consuming and resource intensive. A range of skills are needed including clinical expertise, project management and skills in evidence-based medicine. The commitment and involvement of front-line professionals is crucial.
Private sector joins family planning effort.
1989-12-01
Projects supported by the Directorate for Population (S&T/POP) of the U.S. Agency for International Development and aimed at increasing for-profit private sector involvement in providing family planning services and products are described. Making products commercially available through social-marketing partnerships with the commercial sector, USAID has saved $1.1 million in commodity costs from Brazil, Dominican Republic, Ecuador, Indonesia, and Peru. Active private sector involvement benefits companies, consumers, and donors through increased corporate profits, healthier employees, improved consumer access at lower cost, and the possibility of sustained family planning programs. Moreover, private, for-profit companies will be able to meet service demands over the next 20 years where traditional government and donor agency sources would fail. Using employee surveys and cost-benefit analyses to demonstrate expected financial and health benefits for businesses and work forces, S&T/POP's Technical Information on Population for the Private Sector (TIPPS) project encourages private companies in developing countries to invest in family planning and maternal/child health care for their employees. 36 companies in 9 countries have responded thus far, which examples provided from Peru and Zimbabwe. The Enterprise program's objectives are also to increase the involvement of for-profit companies in delivering family planning services, and to improve the efficiency and effectiveness of private volunteer organizations in providing services. Projects have been started with mines, factories, banks, insurance companies, and parastatals in 27 countries, with examples cited from Ghana and Indonesia. Finally, the Social Marketing for Change project (SOMARC) builds demand and distributes low-cost contraceptives through commercial channels especially to low-income audiences. Partnerships have been initiated with the private sector in 17 developing countries, with examples provided from the Dominican Republic, Liberia and Ecuador. These projects have increased private sector involvement in family planning, thereby promoting service expansion at lower public sector cost.
ERIC Educational Resources Information Center
Guthrie, Robert V.; And Others
A study was made to test the feasibility of a small college (located some distance from a city) establishing a residence unit within a slum or transitional area of a city. The purposes of such a program, in which students and faculty live in the city while continuing their normal course work, would be to: (1) enhance the curriculum by broadening…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... Petroquimica Basica. Description of Items Being Exported: Drilling rigs, platform rentals, compressors, oil... U.S. goods and services from U.S. small businesses to be used in its oil and gas projects. Brief non...'s on- and off-shore oil and gas exploration and production areas. To the extent that Ex-Im Bank is...
ERIC Educational Resources Information Center
Hackbert, Peter H.; Sather, Gregory A.
The Interpersonal Communications Inventory (ICI), developed by Bienvenu, identifies and compares the communication patterns, characteristics, styles, and processes of educational personnel. One hundred forty-three individuals, most of whom were teachers or teacher aides from bilingual schools in six school districts in northeastern Oklahoma,…
ERIC Educational Resources Information Center
Guess, L. Lynn; And Others
This report presents an analysis of the attitudes of parents, teachers, and school administrators to the Chattanooga Incremental Dental Care Program. This project provided dental care in the public elementary schools at specific intervals of time to specific age groups in order to establish and maintain a state of oral health. Dental services were…
Multi-INT and Information Operations Simulation and Training Technologies (MIISTT)
2010-11-01
Communications Ronnie F. Silber Lockheed Martin Raymond T. Tillman L-3 Communications November 2010 Final Report DISTRIBUTION A. Approved...of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services , Directorate for...Michelle Caisse, Ronnie F. Silber , Raymond T. Tillman 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 2830HXA1 7. PERFORMING
ERIC Educational Resources Information Center
Lynch, Joanne
This report presents an evaluation of the International Academy for Bilingual Education and Bicultural Studies, an Elementary and Secondary Education Act Title VII-funded project in its third year of operation in 1992-93. The program provided instructional and support services to 74 Chinese- and English-speaking students in 1 pre-kindergarten, 1…
The Year of Transition in Review
2007-01-01
quarter that 114 border forts have been constructed thus far, and 5 points of entry have been completed.315 SIGIR’s ground project surveys ...security services.366 Lt. Gen. Dempsey recently estimated that 20-25% of the National Police “needed to be weeded out.”367 Finally, recent surveys ...sector development Transportation and Communications system, 33 site surveys have been completed for the communication towers between Mosul and
Yeatman, H R; Nove, T
2002-12-01
This paper presents a case study of the application of a framework for capacity building [Hawe, P., King, L., Noort, M., Jordens, C. and Lloyd, B. (2000) Indicators to Help with Capacity Building in Health Promotion. NSW Health, Sydney] to describe actions aimed at building organizational support for health promotion within an area health service in New South Wales, Australia. The Core Skills in Health Promotion Project (CSHPP) arose from an investigation which reported that participants of a health promotion training course had increased health promotion skills but that they lacked the support to apply their skills in the workplace. The project was action-research based. It investigated and facilitated the implementation of a range of initiatives to support community health staff to apply a more preventive approach in their practice and it contributed to the establishment of new organizational structures for health promotion. An evaluation was undertaken 4 years after the CSHPP was established, and 2 years after it had submitted its final report. Interviews with senior managers, document analysis of written reports, and focus groups with middle managers and service delivery staff were undertaken. Change was achieved in the three dimensions of health infrastructure, program maintenance and problem solving capacity of the organization. It was identified that the critically important elements in achieving the aims of the project-partnership, leadership and commitment-were also key elements of the capacity building framework. This case study provides a practical example of the usefulness of the capacity building framework in orienting health services to be supportive of health promotion.
How can payback from health services research be assessed?
Buxton, M; Hanney, S
1996-01-01
Throughout the world there is a growing recognition that health care should be research-led. This strengthens the requirement for expenditure on health services research to be justified by demonstrating the benefits it produces. However, payback from health research and development is a complex concept and little used term. Five main categories of payback can be identified: knowledge; research benefits; political and administrative benefits; health sector benefits; and broader economic benefits. Various models of research utilization together with previous assessments of payback from research helped in the development of a new conceptual model of how and where payback may occur. The model combines an input-output perspective with an examination of the permeable interfaces between research and its environment. The model characterizes research projects in terms of Inputs, Processes, and Primary Outputs. The last consist of knowledge and research benefits. There are two interfaces between the project and its environment. The first (Project Specification, Selection and Commissioning) is the link with Research Needs Assessment. The second (Dissemination) should lead to Secondary Outputs (which are policy or administrative decisions), and usually Applications (which take the form of behavioural changes), from which Impacts or Final Outcomes result. It is at this final stage that health and wider economic benefits can be measured. A series of case studies were used to assess the feasibility both of applying the model and the payback categorization. The paper draws various conclusions from the case studies and identifies a range of issues for further work.
The Santa Monica freeway diamond lanes. Volume I. Summary. Final report, March 1976-August 1976
DOE Office of Scientific and Technical Information (OSTI.GOV)
Billheimer, J.W.; Bullemer, R.J.; Fratessa, C.
1977-09-01
The Santa Monica Freeway Diamond Lanes, a pair of concurrent-flow preferential lanes for buses and carpools linking the City of Santa Monica, California, with the Los Angeles CBD, opened on March 16, 1976 and operated amid much controversy for 21 weeks until the U.S. District Court halted the project. The Diamond Lane project marked the first time preferential lanes had been created by taking busy freeway lanes out of existing service and dedicating them to the exclusive use of high-occupancy vehicles. This report summarizes the findings of the evaluation of the project. The report addresses a broad range of impactsmore » in the following major areas: Traffic speeds and travel times; traffic volumes and carpool information; bus operations and ridership; safety and enforcement; energy and air quality; and public attitudes and response. Analysis shows that the project succeeded in increasing carpool ridership by 65% and the increased bus service accompanying the Diamond Lanes caused bus ridership to more than triple. Nonetheless, energy savings and air quality improvements were insignificant, freeway accidents increased significantly, non-carpoolers lost far more time than carpoolers gained, and a heated public outcry developed which has delayed the implementation of other preferential treatment projects in S. California.« less
2006-11-24
This final rule with comment period revises the Medicare hospital outpatient prospective payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system, and to implement certain related provisions of the Medicare Prescription Drug, Improvement, and Modernization Act (MMA) of 2003 and the Deficit Reduction Act (DRA) of 2005. In this final rule with comment period, we describe changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the prospective payment system. These changes are applicable to services furnished on or after January 1, 2007. In addition, this final rule with comment period implements future CY 2009 required reporting on quality measures for hospital outpatient services paid under the prospective payment system. This final rule with comment period revises the current list of procedures that are covered when furnished in a Medicare-approved ambulatory surgical center (ASC), which are applicable to services furnished on or after January 1, 2007. This final rule with comment period revises the emergency medical screening requirements for critical access hospitals (CAHs). This final rule with comment period supports implementation of a restructuring of the contracting entities responsibilities and functions that support the adjudication of Medicare fee-for-service (FFS) claims. This restructuring is directed by section 1874A of the Act, as added by section 911 of the MMA. The prior separate Medicare intermediary and Medicare carrier contracting authorities under Title XVIII of the Act have been replaced with the Medicare Administrative Contractor (MAC) authority. This final rule continues to implement the requirements of the DRA that require that we expand the "starter set" of 10 quality measures that we used in FY 2005 and FY 2006 for the hospital inpatient prospective payment system (IPPS) Reporting Hospital Quality Data for the Annual Payment Update (RHQDAPU) program. We began to adopt expanded measures effective for payments beginning in FY 2007. In this rule, we are finalizing additional quality measures for the expanded set of measures for FY 2008 payment purposes. These measures include the HCAHPS survey, as well as Surgical Care Improvement Project (SCIP, formerly Surgical Infection Prevention (SIP)), and Mortality quality measures.
Project-based fieldwork: perspectives of graduate entry students and project sponsors.
Fortune, Tracy; McKinstry, Carol
2012-08-01
This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.
DOE Office of Scientific and Technical Information (OSTI.GOV)
George L. Scott III
2005-01-01
Finalized Phase 2-3 project work has field-proven two separate real-time reservoir processes that were co-developed via funding by the National Energy Technology Laboratory (NETL). Both technologies are presently patented in the United States and select foreign markets; a downhole-commingled reservoir stimulation procedure and a real-time tracer-logged fracturing diagnostic system. Phase 2 and early Phase 3 project work included the research, development and well testing of a U.S. patented gamma tracer fracturing diagnostic system. This stimulation logging process was successfully field-demonstrated; real-time tracer measurement of fracture height while fracturing was accomplished and proven technically possible. However, after the initial well tests,more » there were several licensing issues that developed between service providers that restricted and minimized Realtimezone's (RTZ) ability to field-test the real-time gamma diagnostic system as was originally outlined for this project. Said restrictions were encountered after when one major provider agreed to license their gamma logging tools to another. Both of these companies previously promised contributory support toward Realtimezone's DE-FC26-99FT40129 project work, however, actual support was less than desired when newly-licensed wireline gamma logging tools from one company were converted by the other from electric wireline into slickline, batter-powered ''memory'' tools for post-stimulation logging purposes. Unfortunately, the converted post-fracture measurement memory tools have no applications in experimentally monitoring real-time movement of tracers in the reservoir concurrent with the fracturing treatment. RTZ subsequently worked with other tracer gamma-logging tool companies for basic gamma logging services, but with lessened results due to lack of multiple-isotope detection capability. In addition to real-time logging system development and well testing, final Phase 2 and Phase 3 project work included the development of a real-time reservoir stimulation procedure, which was successfully field-demonstrated and is presently patented in the U.S. and select foreign countries, including Venezuela, Brazil and Canada. Said patents are co-owned by RTZ and the National Energy Technology Lab (NETL). In 2002, Realtimezone and the NETL licensed said patents to Halliburton Energy Services (HES). Additional licensing agreements (LA) are anticipated with other service industry companies in 2005. Final Phase 3 work has led to commercial applications of the real-time reservoir stimulation procedure. Four successfully downhole-mixed well tests were conducted with commercially expected production results. The most recent, fourth field test was a downhole-mixed stimulated well completed in June, 2004, which currently produces 11 BOPD with 90 barrels of water per day. Conducted Phase 2 and Phase 3 field-test work to date has resulted in the fine-tuning of a real-time enhanced stimulation system that will significantly increase future petroleum well recoveries in the United States and foreign petroleum fields, both onshore and offshore, and in vertical and horizontal wells.« less
ETICS: the international software engineering service for the grid
NASA Astrophysics Data System (ADS)
Meglio, A. D.; Bégin, M.-E.; Couvares, P.; Ronchieri, E.; Takacs, E.
2008-07-01
The ETICS system is a distributed software configuration, build and test system designed to fulfil the needs of improving the quality, reliability and interoperability of distributed software in general and grid software in particular. The ETICS project is a consortium of five partners (CERN, INFN, Engineering Ingegneria Informatica, 4D Soft and the University of Wisconsin-Madison). The ETICS service consists of a build and test job execution system based on the Metronome software and an integrated set of web services and software engineering tools to design, maintain and control build and test scenarios. The ETICS system allows taking into account complex dependencies among applications and middleware components and provides a rich environment to perform static and dynamic analysis of the software and execute deployment, system and interoperability tests. This paper gives an overview of the system architecture and functionality set and then describes how the EC-funded EGEE, DILIGENT and OMII-Europe projects are using the software engineering services to build, validate and distribute their software. Finally a number of significant use and test cases will be described to show how ETICS can be used in particular to perform interoperability tests of grid middleware using the grid itself.
Diversion at re-entry using criminogenic CBT: Review and prototypical program development.
Heilbrun, Kirk; Pietruszka, Victoria; Thornewill, Alice; Phillips, Sarah; Schiedel, Rebecca
2017-09-01
Society and the criminal justice system prioritize the reduction of reoffending risk as part of any criminal justice intervention. The Sequential Intercept Model identifies five points of interception at which justice-involved individuals can be diverted into a more rehabilitative alternative: (1) law enforcement/emergency services; (2) booking/initial court hearings; (3) jails/courts; (4) re-entry; and (5) community corrections/community support. The present article focuses on diversion as part of Intercept 5 - re-entry planning and specialized services in the community. We describe the challenges associated with diversion at this stage, and review the relevant research. Next, we describe a "criminogenic cognitive behavioral therapy" project that has been developed and implemented as part of a federal re-entry court. Finally, we discuss the implications of the challenges of intervention at this stage, and the recently developed "Re-entry Project," for research, policy, and practice. Copyright © 2017 John Wiley & Sons, Ltd.
NASA Astrophysics Data System (ADS)
Phillips, C. D.; Thomason, R.; Galloway, M.; Sorey, N.; Stidham, L.; Torgerson, M.
2014-12-01
EMPACTS (Educationally Managed Projects Advancing Curriculum, Technology/Teamwork and Service) is a project-based, adult learning modelthat is designed to enhance learning of course content through real-world application and problem solving self directed and collaborative learning use of technology service to the community EMPACTS students are self-directed in their learning, often working in teams to develop, implement, report and present final project results. EMPACTS faculty use community based projects to increase deeper learning of course content through "real-world" service experiences. Learners develop personal and interpersonal work and communication skills as they plan, execute and complete project goals together. Technology is used as a tool to solve problems and to publish the products of their learning experiences. Courses across a broad STEM curriculum integrate the EMPACTS project experience into the overall learning outcomes as part of the learning college mission of preparing 2Y graduates for future academic and/or workforce success. Since the program began in 2005, there have been over 200 completed projects/year. Student driven successes have led to the establishment of an EMPACTS Technology Corp, which is funded through scholarship and allows EMPACTS learners the opportunity to serve and learn from one another as "peer instructors." Engineering and 3D graphic design teams have written technology proposals and received funding for 3D printing replication projects, which have benefited the college as a whole through grant opportunities tied to these small scale successes. EMPACTS students engage in a variety of outreachprojects with area schools as they share the successes and joys of self directed, inquiry, project based learning. The EMPACTS Program has successfully trained faculty and students in the implementation of the model and conduct semester to semester and once a year workshops for college and K-12 faculty, who are interested in enhancing the learning experience and retention of course content through meaningful, engaging, character building projects. Learner Project successes are celebrated and archived within the framework of the EMPACTS Student Project website. http://faculty.nwacc.edu/EAST_original/Spring2014/Spring2014index.htm
Web-GIS visualisation of permafrost-related Remote Sensing products for ESA GlobPermafrost
NASA Astrophysics Data System (ADS)
Haas, A.; Heim, B.; Schaefer-Neth, C.; Laboor, S.; Nitze, I.; Grosse, G.; Bartsch, A.; Kaab, A.; Strozzi, T.; Wiesmann, A.; Seifert, F. M.
2016-12-01
The ESA GlobPermafrost (www.globpermafrost.info) provides a remote sensing service for permafrost research and applications. The service comprises of data product generation for various sites and regions as well as specific infrastructure allowing overview and access to datasets. Based on an online user survey conducted within the project, the user community extensively applies GIS software to handle remote sensing-derived datasets and requires preview functionalities before accessing them. In response, we develop the Permafrost Information System PerSys which is conceptualized as an open access geospatial data dissemination and visualization portal. PerSys will allow visualisation of GlobPermafrost raster and vector products such as land cover classifications, Landsat multispectral index trend datasets, lake and wetland extents, InSAR-based land surface deformation maps, rock glacier velocity fields, spatially distributed permafrost model outputs, and land surface temperature datasets. The datasets will be published as WebGIS services relying on OGC-standardized Web Mapping Service (WMS) and Web Feature Service (WFS) technologies for data display and visualization. The WebGIS environment will be hosted at the AWI computing centre where a geodata infrastructure has been implemented comprising of ArcGIS for Server 10.4, PostgreSQL 9.2 and a browser-driven data viewer based on Leaflet (http://leafletjs.com). Independently, we will provide an `Access - Restricted Data Dissemination Service', which will be available to registered users for testing frequently updated versions of project datasets. PerSys will become a core project of the Arctic Permafrost Geospatial Centre (APGC) within the ERC-funded PETA-CARB project (www.awi.de/petacarb). The APGC Data Catalogue will contain all final products of GlobPermafrost, allow in-depth dataset search via keywords, spatial and temporal coverage, data type, etc., and will provide DOI-based links to the datasets archived in the long-term, open access PANGAEA data repository.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Flinn, D.G.; Hall, S.; Morris, J.
This volume describes the background research, the application of the proposed loss evaluation techniques, and the results. The research identified present loss calculation methods as appropriate, provided care was taken to represent the various system elements in sufficient detail. The literature search of past methods and typical data revealed that extreme caution in using typical values (load factor, etc.) should be taken to ensure that all factors were referred to the same time base (daily, weekly, etc.). The performance of the method (and computer program) proposed in this project was determined by comparison of results with a rigorous evaluation ofmore » losses on the Salt River Project system. This rigorous evaluation used statistical modeling of the entire system as well as explicit enumeration of all substation and distribution transformers. Further tests were conducted at Public Service Electric and Gas of New Jersey to check the appropriateness of the methods in a northern environment. Finally sensitivity tests indicated data elements inaccuracy of which would most affect the determination of losses using the method developed in this project.« less
Advanced networks and computing in healthcare
Ackerman, Michael
2011-01-01
As computing and network capabilities continue to rise, it becomes increasingly important to understand the varied applications for using them to provide healthcare. The objective of this review is to identify key characteristics and attributes of healthcare applications involving the use of advanced computing and communication technologies, drawing upon 45 research and development projects in telemedicine and other aspects of healthcare funded by the National Library of Medicine over the past 12 years. Only projects publishing in the professional literature were included in the review. Four projects did not publish beyond their final reports. In addition, the authors drew on their first-hand experience as project officers, reviewers and monitors of the work. Major themes in the corpus of work were identified, characterizing key attributes of advanced computing and network applications in healthcare. Advanced computing and network applications are relevant to a range of healthcare settings and specialties, but they are most appropriate for solving a narrower range of problems in each. Healthcare projects undertaken primarily to explore potential have also demonstrated effectiveness and depend on the quality of network service as much as bandwidth. Many applications are enabling, making it possible to provide service or conduct research that previously was not possible or to achieve outcomes in addition to those for which projects were undertaken. Most notable are advances in imaging and visualization, collaboration and sense of presence, and mobility in communication and information-resource use. PMID:21486877
Considering Subcontractors in Distributed Scrum Teams
NASA Astrophysics Data System (ADS)
Rudzki, Jakub; Hammouda, Imed; Mikkola, Tuomas; Mustonen, Karri; Systä, Tarja
In this chapter we present our experiences with working with subcontractors in distributed Scrum teams. The context of our experiences is a medium size software service provider company. We present the way the subcontractors are selected and how Scrum practices can be used in real-life projects. We discuss team arrangements and tools used in distributed development teams highlighting aspects that are important when working with subcontractors. We also present an illustrative example where different phases of a project working with subcontractors are described. The example also provides practical tips on work in such projects. Finally, we present a summary of our data that was collected from Scrum and non-Scrum projects implemented over a few years. This chapter should provide a practical point of view on working with subcontractors in Scrum teams for those who are considering such cooperation.
Moore, Lizzie; Chersich, Matthew F; Steen, Richard; Reza-Paul, Sushena; Dhana, Ashar; Vuylsteke, Bea; Lafort, Yves; Scorgie, Fiona
2014-06-10
Female sex workers (FSWs) experience high levels of sexual and reproductive health (SRH) morbidity, violence and discrimination. Successful SRH interventions for FSWs in India and elsewhere have long prioritised community mobilisation and structural interventions, yet little is known about similar approaches in African settings. We systematically reviewed community empowerment processes within FSW SRH projects in Africa, and assessed them using a framework developed by Ashodaya, an Indian sex worker organisation. In November 2012 we searched Medline and Web of Science for studies of FSW health services in Africa, and consulted experts and websites of international organisations. Titles and abstracts were screened to identify studies describing relevant services, using a broad definition of empowerment. Data were extracted on service-delivery models and degree of FSW involvement, and analysed with reference to a four-stage framework developed by Ashodaya. This conceptualises community empowerment as progressing from (1) initial engagement with the sex worker community, to (2) community involvement in targeted activities, to (3) ownership, and finally, (4) sustainability of action beyond the community. Of 5413 articles screened, 129 were included, describing 42 projects. Targeted services in FSW 'hotspots' were generally isolated and limited in coverage and scope, mostly offering only free condoms and STI treatment. Many services were provided as part of research activities and offered via a clinic with associated community outreach. Empowerment processes were usually limited to peer-education (stage 2 of framework). Community mobilisation as an activity in its own right was rarely documented and while most projects successfully engaged communities, few progressed to involvement, community ownership or sustainability. Only a few interventions had evolved to facilitate collective action through formal democratic structures (stage 3). These reported improved sexual negotiating power and community solidarity, and positive behavioural and clinical outcomes. Sustainability of many projects was weakened by disunity within transient communities, variable commitment of programmers, low human resource capacity and general resource limitations. Most FSW SRH projects in Africa implemented participatory processes consistent with only the earliest stages of community empowerment, although isolated projects demonstrate proof of concept for successful empowerment interventions in African settings.
2014-01-01
Background Female sex workers (FSWs) experience high levels of sexual and reproductive health (SRH) morbidity, violence and discrimination. Successful SRH interventions for FSWs in India and elsewhere have long prioritised community mobilisation and structural interventions, yet little is known about similar approaches in African settings. We systematically reviewed community empowerment processes within FSW SRH projects in Africa, and assessed them using a framework developed by Ashodaya, an Indian sex worker organisation. Methods In November 2012 we searched Medline and Web of Science for studies of FSW health services in Africa, and consulted experts and websites of international organisations. Titles and abstracts were screened to identify studies describing relevant services, using a broad definition of empowerment. Data were extracted on service-delivery models and degree of FSW involvement, and analysed with reference to a four-stage framework developed by Ashodaya. This conceptualises community empowerment as progressing from (1) initial engagement with the sex worker community, to (2) community involvement in targeted activities, to (3) ownership, and finally, (4) sustainability of action beyond the community. Results Of 5413 articles screened, 129 were included, describing 42 projects. Targeted services in FSW ‘hotspots’ were generally isolated and limited in coverage and scope, mostly offering only free condoms and STI treatment. Many services were provided as part of research activities and offered via a clinic with associated community outreach. Empowerment processes were usually limited to peer-education (stage 2 of framework). Community mobilisation as an activity in its own right was rarely documented and while most projects successfully engaged communities, few progressed to involvement, community ownership or sustainability. Only a few interventions had evolved to facilitate collective action through formal democratic structures (stage 3). These reported improved sexual negotiating power and community solidarity, and positive behavioural and clinical outcomes. Sustainability of many projects was weakened by disunity within transient communities, variable commitment of programmers, low human resource capacity and general resource limitations. Conclusions Most FSW SRH projects in Africa implemented participatory processes consistent with only the earliest stages of community empowerment, although isolated projects demonstrate proof of concept for successful empowerment interventions in African settings. PMID:24916108
Towards a single seismological service infrastructure in Europe
NASA Astrophysics Data System (ADS)
Spinuso, A.; Trani, L.; Frobert, L.; Van Eck, T.
2012-04-01
In the last five year services and data providers, within the seismological community in Europe, focused their efforts in migrating the way of opening their archives towards a Service Oriented Architecture (SOA). This process tries to follow pragmatically the technological trends and available solutions aiming at effectively improving all the data stewardship activities. These advancements are possible thanks to the cooperation and the follow-ups of several EC infrastructural projects that, by looking at general purpose techniques, combine their developments envisioning a multidisciplinary platform for the earth observation as the final common objective (EPOS, Earth Plate Observation System) One of the first results of this effort is the Earthquake Data Portal (http://www.seismicportal.eu), which provides a collection of tools to discover, visualize and access a variety of seismological data sets like seismic waveform, accelerometric data, earthquake catalogs and parameters. The Portal offers a cohesive distributed search environment, linking data search and access across multiple data providers through interactive web-services, map-based tools and diverse command-line clients. Our work continues under other EU FP7 projects. Here we will address initiatives in two of those projects. The NERA, (Network of European Research Infrastructures for Earthquake Risk Assessment and Mitigation) project will implement a Common Services Architecture based on OGC services APIs, in order to provide Resource-Oriented common interfaces across the data access and processing services. This will improve interoperability between tools and across projects, enabling the development of higher-level applications that can uniformly access the data and processing services of all participants. This effort will be conducted jointly with the VERCE project (Virtual Earthquake and Seismology Research Community for Europe). VERCE aims to enable seismologists to exploit the wealth of seismic data within a data-intensive computation framework, which will be tailored to the specific needs of the community. It will provide a new interoperable infrastructure, as the computational backbone laying behind the publicly available interfaces. VERCE will have to face the challenges of implementing a service oriented architecture providing an efficient layer between the Data and the Grid infrastructures, coupling HPC data analysis and HPC data modeling applications through the execution of workflows and data sharing mechanism. Online registries of interoperable worklflow components, storage of intermediate results and data provenance are those aspects that are currently under investigations to make the VERCE facilities usable from a large scale of users, data and service providers. For such purposes the adoption of a Digital Object Architecture, to create online catalogs referencing and describing semantically all these distributed resources, such as datasets, computational processes and derivative products, is seen as one of the viable solution to monitor and steer the usage of the infrastructure, increasing its efficiency and the cooperation among the community.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nguyen, Ba Nghiep; Simmons, Kevin L.
2013-12-02
This quarterly report summarizes the status of the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The final CRADA documents processed by PNNL’s Legal Services were submitted to all the parties for signatures.
ERIC Educational Resources Information Center
Vermont Univ., Burlington. Center on Disability and Community Inclusion.
This report describes the activities and outcomes of a project designed to prepare educational specialists to serve students with serious emotional disturbance effectively within general education settings. The primary goal was to create a concentration within an existing special education graduate program that would train at least 10 students per…
2017-07-18
FINAL REPORT In Situ Treatment Train for Remediation of Perfluoroalkyl Contaminated Groundwater: In Situ Chemical Oxidation of Sorbed... Contaminants (ISCO-SC) SERDP Project ER-2423 OCTOBER 2017 M. Crimi, T. Holsen, C. Bellona Clarkson University C. Divine Arcadis E...Defense. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer , or otherwise, does not
NASA Technical Reports Server (NTRS)
Bengelsdorf, Irving
1996-01-01
This report deals with the Biological Assessment, Biological Opinion and Final Report on the construction of a high- efficiency 34-meter, multifrequency beam-waveguide antenna at the Apollo Site of the Goldstone Deep Space Communications Complex, operated by JPL. According to the Endangered Species Act of 1973, a Biological Assessment must be conducted and a Biological Opinion, with terms and conditions, rendered (the Opinion by the U.S. Department of the Interior) before construction of any federal project that may affect endangered or threatened flora or fauna. After construction, a final report is filed with the Department. The desert tortoise, designated "threatened" by the U.S. Fish and Wildlife Service, and the Mojave ground squirrel and the Lane Mountain milk vetch, both designated "candidate threatened," required the reporting specified by the Act. The Assessment found no significant danger to the animal species if workers are educated about them. No stands of the plant species were observed in the surveyed construction area. The Department issued a Biological Opinion to safeguard the two animal species. The Service and the California Department of Fish and Game both issued a Biological Concurrence that JPL had satisfied all environmental criteria for preserving threatened species.
Evolving the NASA Near Earth Network for the Next Generation of Human Space Flight
NASA Technical Reports Server (NTRS)
Roberts, Christopher J.; Carter, David L.; Hudiburg, John J.; Tye, Robert N.; Celeste, Peter B.
2014-01-01
The purpose of this paper is to present the planned development and evolution of the NASA Near Earth Network (NEN) launch communications services in support of the next generation of human space flight programs. Following the final space shuttle mission in 2011, the two NEN launch communications stations were decommissioned. Today, NASA is developing the next generation of human space flight systems focused on exploration missions beyond low-earth orbit, and supporting the emerging market for commercial crew and cargo human space flight services. The NEN is leading a major initiative to develop a modern high data rate launch communications ground architecture with support from the Kennedy Space Center Ground Systems Development and Operations Program and in partnership with the U.S. Air Force (USAF) Eastern Range. This initiative, the NEN Launch Communications Stations (LCS) development project, successfully completed its System Requirements Review in November 2013. This paper provides an overview of the LCS project and a summary of its progress. The LCS ground architecture, concept of operations, and driving requirements to support the new heavy-lift Space Launch System and Orion Multi-Purpose Crew Vehicle for Exploration Mission-1 are presented. Finally, potential future extensions to the ground architecture beyond EM-1 are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA); the Federal Land Policy and Management Act of 1976, as amended; and the California Environmental Quality Act of 1970 (CEQA), the Bureau of Land Management (BLM), the United States Forest Service (USFS), and the Great Basin Unified Air Pollution Control District (GBUAPCD), a California State agency, have prepared a Final Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development Project near the town of Mammoth Lakes in Mono County, California, and by this notice are announcing its availability.
Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model
NASA Astrophysics Data System (ADS)
Zhao, Erdong; Li, Shangqi
2017-08-01
As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.
Identifying User Needs and the Participative Design Process
NASA Astrophysics Data System (ADS)
Meiland, Franka; Dröes, Rose-Marie; Sävenstedt, Stefan; Bergvall-Kåreborn, Birgitta; Andersson, Anna-Lena
As the number of persons with dementia increases and also the demands on care and support at home, additional solutions to support persons with dementia are needed. The COGKNOW project aims to develop an integrated, user-driven cognitive prosthetic device to help persons with dementia. The project focuses on support in the areas of memory, social contact, daily living activities and feelings of safety. The design process is user-participatory and consists of iterative cycles at three test sites across Europe. In the first cycle persons with dementia and their carers (n = 17) actively participated in the developmental process. Based on their priorities of needs and solutions, on their disabilities and after discussion between the team, a top four list of Information and Communication Technology (ICT) solutions was made and now serves as the basis for development: in the area of remembering - day and time orientation support, find mobile service and reminding service, in the area of social contact - telephone support by picture dialling, in the area of daily activities - media control support through a music playback and radio function, and finally, in the area of safety - a warning service to indicate when the front door is open and an emergency contact service to enhance feelings of safety. The results of this first project phase show that, in general, the people with mild dementia as well as their carers were able to express and prioritize their (unmet) needs, and the kind of technological assistance they preferred in the selected areas. In next phases it will be tested if the user-participatory design and multidisciplinary approach employed in the COGKNOW project result in a user-friendly, useful device that positively impacts the autonomy and quality of life of persons with dementia and their carers.
28 CFR 551.60 - Volunteer community service projects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Volunteer community service projects. 551...
28 CFR 551.60 - Volunteer community service projects.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...
28 CFR 551.60 - Volunteer community service projects.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...
28 CFR 551.60 - Volunteer community service projects.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...
28 CFR 551.60 - Volunteer community service projects.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...
The p-medicine portal—a collaboration platform for research in personalised medicine
Schera, Fatima; Weiler, Gabriele; Neri, Elias; Kiefer, Stephan; Graf, Norbert
2014-01-01
The European project p-medicine creates an information technology infrastructure that facilitates the development from current medical practice to personalised medicine. The main access point to this infrastructure is the p-medicine portal that provides clinicians, patients, and researchers a platform to collaborate, share data and expertise, and use tools and services to improve personalised treatments of patients. In this document, we describe the community-based structure of the p-medicine portal and provide information about the p-medicine security framework implemented in the portal. Finally, we show the user interface and describe the p-medicine tools and services integrated in the portal. PMID:24567755
A multi-service data management platform for scientific oceanographic products
NASA Astrophysics Data System (ADS)
D'Anca, Alessandro; Conte, Laura; Nassisi, Paola; Palazzo, Cosimo; Lecci, Rita; Cretì, Sergio; Mancini, Marco; Nuzzo, Alessandra; Mirto, Maria; Mannarini, Gianandrea; Coppini, Giovanni; Fiore, Sandro; Aloisio, Giovanni
2017-02-01
An efficient, secure and interoperable data platform solution has been developed in the TESSA project to provide fast navigation and access to the data stored in the data archive, as well as a standard-based metadata management support. The platform mainly targets scientific users and the situational sea awareness high-level services such as the decision support systems (DSS). These datasets are accessible through the following three main components: the Data Access Service (DAS), the Metadata Service and the Complex Data Analysis Module (CDAM). The DAS allows access to data stored in the archive by providing interfaces for different protocols and services for downloading, variables selection, data subsetting or map generation. Metadata Service is the heart of the information system of the TESSA products and completes the overall infrastructure for data and metadata management. This component enables data search and discovery and addresses interoperability by exploiting widely adopted standards for geospatial data. Finally, the CDAM represents the back-end of the TESSA DSS by performing on-demand complex data analysis tasks.
User involvement: children's participation in a parent-baby group.
Maconochie, Heloise; McNeill, Fiona
2010-08-01
According to the National Service Framework, children have a right to participate in the development of healthcare services and yet research suggests that young children are at risk of exclusion from user involvement initiatives. This paper outlines the findings of a participatory action research project conducted with families attending a health visitors' parent-baby group. A combination of participatory research methods were used to ascertain the infants' perspectives of the service and this led to a number of changes in terms of professional attitudes, service provision and working practices. Changes in professional attitudes included acknowledging the importance of social interaction to the children, recognising young children's views as embodied and produced within social interactions, and respecting children as active contributors and not simply as passive recipients of healthcare services. Changes in service provision resulted in redistributing resources, structures and spaces to take account of children's perspectives. Finally, reciprocity and responsiveness were seen as key components in enhancing young children's participation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-08-01
This study is part of a three-phased demonstration project to reduce energy consumption in hospitals through practical life-cycle, cost-effective modifications and alterations. Funds for the demonstration project are provided by the American Hospital Association (AHA), the Department of Energy (DOE), and the Department of Health and Human Services (DHHS). Two hospitals in Michigan were selected for the project, Bay Medical Center in Bay City and St. Mary's Hospital in Grand Rapids. The objectives of this study, which is funded by HHS, are to investigate and analyze energy usage of the facilities and to identify all life-cycle, cost-effective changes required tomore » effect a reduction in energy consumption.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-08-01
This study is part of a three-phased demonstration project to reduce energy consumption in hospitals through practical life-cycle, cost-effective modifications and alterations. Funds for the demonstration project are provided by the American Hospital Association (AHA), the Department of Energy (DOE), and the Department of Health and Human Services (DHHS). Two hospitals in Michigan were selected for the project, Bay Medical Center in Bay City and St. Mary's Hospital in Ground Rapids. The objectives of this study, which is funded by HHS, are to investigate and analyze energy usage of the facilities and to identify all life-cycle, cost-effective changes required tomore » effect a reduction in energy consumption.« less
Promoting excellence in end-of-life care: a report on innovative models of palliative care.
Byock, Ira; Twohig, Jeanne Sheils; Merriman, Melanie; Collins, Karyn
2006-02-01
Promoting Excellence in End-of Life Care, a national program of The Robert Wood Johnson Foundation, funded 22 demonstration projects representing a wide range of health care settings and patient populations to develop innovative models for delivering palliative care that addressed documented deficiencies in the care of patients and families facing the final stage of life. To determine the practicality (feasibility of development and operation as well as acceptance by stakeholders) of new models of care and to determine the impact of the models on access to, quality of and financing for palliative care. The program cannot report scientifically rigorous outcomes, but the grant-funded projects used a variety of methods and measures to assess acceptance of new models and their impact from the perspectives of various stakeholders, including patients and their families, clinicians, administrators and payers. While it is not possible to aggregate data across projects, the data reported to the Promoting Excellence national program office were used to describe program impact with respect to the practicality of palliative care service integration into existing clinical care settings (feasibility and acceptance by stakeholders), the availability and use of palliative care services (access), quality of care (conformance to patient expectations and accepted clinical standards) and costs of care. The 22 projects provided services in urban as well as rural settings, in integrated health systems, hospitals, outpatient clinics, cancer centers, nursing homes, renal dialysis clinics, inner city public health and safety net systems and prisons. Populations served included prison inmates, military veterans, renal dialysis patients, Native Americans, Native Alaskans, and African American patients, inner-city medically underserved patients, pediatric patients, and persons with serious mental illness patients. Hosting or adopting institutions sustained or expanded twenty of the 22 models, and feedback from all stakeholders was positive. Project sites developed and utilized new palliative care services and addressed quality through implementation of new standards and clinical protocols. Costs of care, where they could be assessed, were unaffected or decreased for project patients versus historical or concurrent controls. The 22 Promoting Excellence in End-of Life Care projects demonstrated that by individualizing patient and family assessment, effectively employing existing resources and aligning services with specific patient and family needs, it is possible to expand access to palliative services and improve quality of care in ways that are financially feasible and acceptable to patients, families, clinicians, administrators, and payers.
Radiology Architecture Project Primer.
Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott
2017-12-19
The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.
The first educational interferometer in Mexico (FEYMANS): A novel project
NASA Astrophysics Data System (ADS)
Villicana Pedraza, Ilhuiyolitzin; Guesten, Rolf; Saucedo Morales, Julio Cesar; Carreto, Francisco; Valdes Estrada, Erik; Wendolyn Blanco Cardenas, Monica; Rodríguez Garza, Carolina B.; Pech Castillo, Gerardo A.; Ángel Vaquerizo, Juan
2016-07-01
An interferometer is composed of several radio telescopes (dishes) separated by a defined distance and used in synchrony. This kind of array produces a superior angular resolution, better than the resolution achieved by a single dish of the same combined area. In this work we propose the First Educational Youth Mexican Array North South, FEYMANS. It consists of an educational interferometer with initially four dishes. This array harvests Mexico's geography by locating each dish at the periphery of the country; creating new scientific links of provincial populations with the capital. The FEYMANS project focus in high school students and their projects on physics, chemistry and astronomy as a final project. Also, it can be used for bachelor theses. The initial and central dish-node is planed to be in Mexico City. After its construction, the efforts will focus to build subsequent nodes, on the Northwest region, Northeast, or Southeast. Region Northwest will give service to Baja California, Sonora and Chihuahua states. Region Northeast will cover Coahuila, Nuevo Leon and Tamaulipas. Finally, region Southeast will give access to Yucatan, Quintana Roo, Campeche, Tabasco and Chiapas. This project has been conceived by young professional astronomers and Mexican experts that will operate each node. Also, we have the technical support of the "Max Planck Institute fuer Radioastronomy in Bonn Germany" and the educational model of the "PARTNeR" project in Spain. This interferometer will be financed by Mexico's Federal Congress and by Mexico City's Legislative Assembly (ALDF).
ERIC Educational Resources Information Center
Middleton, James A.; And Others
This paper reports the results of a 4-year longitudinal study of approximately 600 urban mathematics teachers who were surveyed to ascertain their attitudes regarding certain attributes of the profession of mathematics teaching, specifically: the use of the professional organization as a major referent, the belief in service to the public, the…
Special Inspector General for Iraq Reconstruction, Report to Congress, January 30, 2007
2007-01-30
quarter that 114 border forts have been constructed thus far, and 5 points of entry have been completed.315 SIGIR’s ground project surveys ...security services.366 Lt. Gen. Dempsey recently estimated that 20-25% of the National Police “needed to be weeded out.”367 Finally, recent surveys ...sector development Transportation and Communications system, 33 site surveys have been completed for the communication towers between Mosul and
The NASA Heliophysics Active Final Archive at the Space Physics Data Facility
NASA Technical Reports Server (NTRS)
McGuire, Robert E.
2012-01-01
The 2009 NASA Heliophysics Science Data Management Policy re-defined and extended the responsibilities of the Space Physics Data Facility (SPDF) project. Building on SPDF's established capabilities, the new policy assigned the role of active "Final Archive" for non-solar NASA Heliophysics data to SPDF. The policy also recognized and formalized the responsibilities of SPDF as a source for critical infrastructure services such as VSPO to the overall Heliophysics Data Environment (HpDE) and as a Center of Excellence for existing SPDF science-enabling services and software including CDAWeb, SSCWeb/4D Orbit Viewer, OMNIweb and CDF. We will focus this talk to the principles, strategies and planned SPDF architecture to effectively and efficiently perform these roles, with special emphasis on how SPDF will ensure the long-term preservation and ongoing online community access to all the data entrusted to SPDF. We will layout our archival philosophy and what we are advocating in our work with NASA missions both current and future, with potential providers of NASA and NASA-relevant archival data, and to make the data and metadata held by SPDF accessible to other systems and services within the overall HpOE. We will also briefly review our current services, their metrics and our current plans and priorities for their evolution.
Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina
2016-01-01
Abstract The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents’ obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data. The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have. This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries’ needs and priorities. The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries’ Health Services for monitoring adolescents’ obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles. PMID:27015195
Tabacchi, Garden; Bianco, Antonino; Alessi, Nicola; Filippi, Anna Rita; Napoli, Giuseppe; Jemni, Monèm; Censi, Laura; Breda, João; Schumann, Nathali Lehmann; Firenze, Alberto; Vitale, Francesco; Mammina, Caterina
2016-03-01
The Adolescents Surveillance System for Obesity prevention (ASSO) Project aimed at developing standardized and web-based tools for collecting data on adolescents' obesity and its potential determinants. This has been implemented and piloted in the local area of Palermo city, Italy. The aim of the present study is to provide an overview of the Project's design, implementation, and evaluation, highlighting all the aspects for a potential scale-up of the surveillance system on the whole national territory and abroad, as a sustainable and effective source of data.The overall structure and management, the ASSO-toolkit, the ASSO-NutFit software, and all developed and used procedures for recruiting, training, and data collecting/analyzing are addressed. An interim evaluation has been performed through a feasibility study; a final Project evaluation has been performed reporting the Strengths, Weaknesses, Opportunities, and Threats (SWOT) and the attributes that a surveillance system should have.This article provides a detailed overview of the Project and highlights that ASSO can be considered a valid, logical, coherent, efficient, and sustainable surveillance system that is consistent with countries' needs and priorities.The system developed by the ASSO Project provides high-quality data and complies with several characteristics typical of a suitable surveillance system. It has a potential of being adopted within the National Health Service and other countries' Health Services for monitoring adolescents' obesity and its determinants, such as food intakes, behaviors, physical activity, and fitness profiles.
Developing a European grid infrastructure for cancer research: vision, architecture and services
Tsiknakis, M; Rueping, S; Martin, L; Sfakianakis, S; Bucur, A; Sengstag, T; Brochhausen, M; Pucaski, J; Graf, N
2007-01-01
Life sciences are currently at the centre of an information revolution. The nature and amount of information now available opens up areas of research that were once in the realm of science fiction. During this information revolution, the data-gathering capabilities have greatly surpassed the data-analysis techniques. Data integration across heterogeneous data sources and data aggregation across different aspects of the biomedical spectrum, therefore, is at the centre of current biomedical and pharmaceutical R&D. This paper reports on original results from the ACGT integrated project, focusing on the design and development of a European Biomedical Grid infrastructure in support of multi-centric, post-genomic clinical trials (CTs) on cancer. Post-genomic CTs use multi-level clinical and genomic data and advanced computational analysis and visualization tools to test hypotheses in trying to identify the molecular reasons for a disease and the stratification of patients in terms of treatment. The paper provides a presentation of the needs of users involved in post-genomic CTs and presents indicative scenarios, which drive the requirements of the engineering phase of the project. Subsequently, the initial architecture specified by the project is presented, and its services are classified and discussed. A range of such key services, including the Master Ontology on sCancer, which lie at the heart of the integration architecture of the project, is presented. Special efforts have been taken to describe the methodological and technological framework of the project, enabling the creation of a legally compliant and trustworthy infrastructure. Finally, a short discussion of the forthcoming work is included, and the potential involvement of the cancer research community in further development or utilization of the infrastructure is described. PMID:22275955
Wade, Victoria A; Taylor, Alan D; Kidd, Michael R; Carati, Colin
2016-05-16
This study was a component of the Flinders Telehealth in the Home project, which tested adding home telehealth to existing rehabilitation, palliative care and geriatric outreach services. Due to the known difficulty of transitioning telehealth projects services, a qualitative study was conducted to produce a preferred implementation approach for sustainable and large-scale operations, and a process model that offers practical advice for achieving this goal. Initially, semi-structured interviews were conducted with senior clinicians, health service managers and policy makers, and a thematic analysis of the interview transcripts was undertaken to identify the range of options for ongoing operations, plus the factors affecting sustainability. Subsequently, the interviewees and other decision makers attended a deliberative forum in which participants were asked to select a preferred model for future implementation. Finally, all data from the study was synthesised by the researchers to produce a process model. 19 interviews with senior clinicians, managers, and service development staff were conducted, finding strong support for home telehealth but a wide diversity of views on governance, models of clinical care, technical infrastructure operations, and data management. The deliberative forum worked through these options and recommended a collaborative consortium approach for large-scale implementation. The process model proposes that the key factor for large-scale implementation is leadership support, which is enabled by 1) showing solutions to the problems of service demand, budgetary pressure and the relationship between hospital and primary care, 2) demonstrating how home telehealth aligns with health service policies, and 3) achieving clinician acceptance through providing evidence of benefit and developing new models of clinical care. Two key actions to enable change were marketing telehealth to patients, clinicians and policy-makers, and building a community of practice. The implementation of home telehealth services is still in an early stage. Change agents and a community of practice can contribute by marketing telehealth, demonstrating policy alignment and providing potential solutions for difficult health services problems. This should assist health leaders to move from trials to large-scale services.
Cloud Computing for Geosciences--GeoCloud for standardized geospatial service platforms (Invited)
NASA Astrophysics Data System (ADS)
Nebert, D. D.; Huang, Q.; Yang, C.
2013-12-01
The 21st century geoscience faces challenges of Big Data, spike computing requirements (e.g., when natural disaster happens), and sharing resources through cyberinfrastructure across different organizations (Yang et al., 2011). With flexibility and cost-efficiency of computing resources a primary concern, cloud computing emerges as a promising solution to provide core capabilities to address these challenges. Many governmental and federal agencies are adopting cloud technologies to cut costs and to make federal IT operations more efficient (Huang et al., 2010). However, it is still difficult for geoscientists to take advantage of the benefits of cloud computing to facilitate the scientific research and discoveries. This presentation reports using GeoCloud to illustrate the process and strategies used in building a common platform for geoscience communities to enable the sharing, integration of geospatial data, information and knowledge across different domains. GeoCloud is an annual incubator project coordinated by the Federal Geographic Data Committee (FGDC) in collaboration with the U.S. General Services Administration (GSA) and the Department of Health and Human Services. It is designed as a staging environment to test and document the deployment of a common GeoCloud community platform that can be implemented by multiple agencies. With these standardized virtual geospatial servers, a variety of government geospatial applications can be quickly migrated to the cloud. In order to achieve this objective, multiple projects are nominated each year by federal agencies as existing public-facing geospatial data services. From the initial candidate projects, a set of common operating system and software requirements was identified as the baseline for platform as a service (PaaS) packages. Based on these developed common platform packages, each project deploys and monitors its web application, develops best practices, and documents cost and performance information. This paper presents the background, architectural design, and activities of GeoCloud in support of the Geospatial Platform Initiative. System security strategies and approval processes for migrating federal geospatial data, information, and applications into cloud, and cost estimation for cloud operations are covered. Finally, some lessons learned from the GeoCloud project are discussed as reference for geoscientists to consider in the adoption of cloud computing.
NASA Astrophysics Data System (ADS)
Gerzen, Tatjana; Mainul Hoque, M.; Wilken, Volker; Minkwitz, David; Schlüter, Stefan
2015-04-01
The European Geostationary Navigation Overlay Service (EGNOS) is the European Satellite Based Augmentation Service (SBAS) that provides value added services, in particular to Safety of Live (SoL) users of the Global Navigation Satellite Systems (GNSS). In the frame of the European GNSS Evolution Programme (EGEP), ESA has launched several activities, which are aiming to support the design, development and qualification of the future operational EGNOS infrastructure and associated services. The ionosphere is the part of the upper Earth's atmosphere between about 50 km and 1000 km above the Earth's surface, which contains sufficient free electrons to cause strong impact on radio signal propagation. Therefore, treatment of the ionosphere is a critical issue to guarantee the EGNOS system performance. In order to conduct the EGNOS end-to-end performance simulations and to assure the capability for maintaining integrity of the EGNOS system especially during ionospheric storm conditions, Ionospheric Reference Scenarios (IRSs) are introduced by ESA. The project Data Assimilation Techniques for Ionospheric Reference Scenarios (DAIS) - aims to generate improved EGNOS IRSs by combining space borne and ground based GNSS observations. The main focus of this project is to demonstrate that ionospheric radio occultation (IRO) measurements can significantly contribute to fill data gaps in GNSS ground networks (particularly in Africa and over the oceans) when generating the IRSs. The primary tasks are the calculation and validation of time series of IRSs (i.e. TEC maps) by a 3D assimilation approach that combines IRO and ground based GNSS measurements with an ionospheric background model in an optimal way. In the first phase of the project we selected appropriate test periods, one presenting perturbed and the other one - nominal ionospheric conditions, collected and filtered the corresponding data. We defined and developed an applicable technique for the 3D assimilation and applied this technique for the generation of IRSs covering the EGNOS V3 service area. This presentation gives an overview about the DAIS project and the first results. We outline the assimilation approach, show test run results and finally address and discuss open questions.
Developing a costing framework for palliative care services.
Mosoiu, Daniela; Dumitrescu, Malina; Connor, Stephen R
2014-10-01
Palliative care services have been reported to be a less expensive alternative to traditional treatment; however, little is known about how to measure the cost of delivering quality palliative care. The purpose of this project was to develop a standardized method for measuring the cost of palliative care delivery that could potentially be replicated in multiple settings. The project was implemented in three stages. First, an interdisciplinary group of palliative care experts identified standards of quality palliative care delivery in the inpatient and home care services. Surveys were conducted of government agencies and palliative care providers to identify payment practices and budgets for palliative care services. In the second phase, unit costs were defined and a costing framework was designed to measure inpatient and home-based palliative care unit costs. The final phase was advocacy for inclusion of calculated costs into the national funding system. In this project, a reliable framework for determining the cost of inpatient and home-based palliative care services was developed. Inpatient palliative care cost in Romania was calculated at $96.58 per day. Home-based palliative care was calculated at $30.37 per visit, $723.60 per month, and $1367.71 per episode of care, which averaged 45 visits. A standardized methodology and framework for costing palliative care are presented. The framework allows a country or provider of care to substitute their own local costs to generate cost information relevant to the health-care system. In Romania, this allowed the palliative care provider community to advocate for a consistent payment system. Copyright © 2014 American Academy of Hospice and Palliative Medicine. Published by Elsevier Inc. All rights reserved.
Semisa, Domenico; Lasalvia, Antonio; Miceli, Maurizio; Dall'Agnola, Rosa Bruna; Pucci, Cristina; Bissoli, Sarah; Visani, Enrico; Pismataro, Carmine Pasquale; Vanetti, Michele; Pioli, Rosaria; Ruggeri, Mirella; Lora, Antonio
2008-01-01
This paper aims at presenting the most significant results emerging from the work carried out by the focus groups of the multi-centre Project SIEP-DIRECT'S. The Project is aimed at assessing the existing discrepancies between the evidence-based NICE guidelines for schizophrenia and the usual practices of care given by Italian mental health services. Each focus group was requested to give an evaluation on: (a) appropriateness of the English NICE guidelines in the context of the Italian mental health services; (b) clarity and usefulness of the 103 indicators developed on the basis of the NICE recommendations to measure their level of application within the services. In each of the 19 mental health departments or psychiatric services participating in the Project there were organized "multidisciplinary" focus groups and "specialistic" focus groups. The former included, amongst others, professional operators of the mental health services, patients, their relatives, representatives of patient organizations and general practitioners. They examined the recommendations and indicators upon which the participants could express their opinion or judgment based on their knowledge, experience or information in their possession. The latter group, composed only of psychiatrists, examined the recommendations and indicators relative to pharmacological treatments that regarded the specific competences of their professional category. Most NICE recommendations seemed appropriate to the working context of the Italian services. However, some perplexity emerged as regards specific organizational models of the services, such as the specific services for psychotic onsets or the assertive outreach teams, which were believed not to be strictly pertinent to the traditional organization of mental health care in our Country. There were also some criticisms regarding the cognitive-behavioural treatments which the NICE Guidelines recommend as the principle psychotherapeutic option for patients with schizophrenia, since in many Italian services, when the use of psychological interventions are needed, the tendency is to prefer interventions based on psychodynamic theories. The SIEP indicators were generally held to be clear and acceptable. In the view of the focus groups, the NICE guidelines are on the whole useful and suitable for orientating the services in the choice of more efficacious practices in the treatment of patients with schizophrenia. Moreover, the results obtained legitimate the use of the set of SIEP indicators for the evaluation of good practices and the quality of care offered by Italian services. Finally, the use of focus groups delines to a different context as well as the verification of the comprehensibility and applicability of SIEP indicators.
The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260
DOE Office of Scientific and Technical Information (OSTI.GOV)
Post, Thomas C.; Strom, Dean; Beulow, Laura
The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 andmore » 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)« less
[Evaluation of 12 pilot projects to improve outpatient palliative care].
Schmidt-Wolf, G; Elsner, F; Lindena, G; Hilgers, R-D; Heussen, N; Rolke, R; Ostgathe, C; Radbruch, L
2013-12-01
With a priority programme the German Cancer Aid supported the development of quality-assured outpatient palliative care to cover the whole country. The 12 regional pilot projects funded with the aim to improve outpatient palliative care in different models and different frameworks were concurrently monitored and evaluated. The supported projects, starting and ending individually, documented all patients who were cared for using HOPE (Hospice and palliative care evaluation) and MIDOS (Minimal documentation system for palliative patients). Total data were analyzed for 3239 patients decriptively. In addition to the quantitative data the experiences of the projects were recorded in a number of workshops (2008, 2009, 2010, and 2012). In particular, the experiences reported in the final meeting in July 2012 were considered for this article as well as the final reports for the German Cancer Aid. In the quantitative evaluation 85.6% of 3239 palliative care patients had a cancer diagnosis. In all model projects the goal of a network with close cooperation of primary providers, social support, and outpatient and inpatient specialist services has been achieved. For all projects, the initial financing of the German Cancer Aid was extremely important, because contracts with health insurance funds were negotiated slowly, and could then be built on the experiences with the projects. The participants of the project-completion meeting emphasized the need to carry out a market analysis before starting palliative care organizations considering the different regional structures and target groups of patients. Education, training and continuing education programs contribute significantly to the network. A reliably funded coordination center/case management across all institutions is extremely important. © Georg Thieme Verlag KG Stuttgart · New York.
A web application to support telemedicine services in Brazil.
Barbosa, Ana Karina P; de A Novaes, Magdala; de Vasconcelos, Alexandre M L
2003-01-01
This paper describes a system that has been developed to support Telemedicine activities in Brazil, a country that has serious problems in the delivery of health services. The system is a part of the broader Tele-health Project that has been developed to make health services more accessible to the low-income population in the northeast region. The HealthNet system is based upon a pilot area that uses fetal and pediatric cardiology. This article describes both the system's conceptual model, including the tele-diagnosis and second medical opinion services, as well as its architecture and development stages. The system model describes both collaborating tools used asynchronously, such as discussion forums, and synchronous tools, such as videoconference services. Web and free-of-charge tools are utilized for implementation, such as Java and MySQL database. Furthermore, an interface with Electronic Patient Record (EPR) systems using Extended Markup Language (XML) technology is also proposed. Finally, considerations concerning the development and implementation process are presented.
Kabli, Noufissa; Liu, Ben; Seifert, Tricia
2013-01-01
Objective. To examine academic service-learning pedagogy on student learning and perceptions of drug misuse and addiction. Design. Third- and fourth-year pharmacology students were exposed to an academic service-learning pedagogy that integrated a community service experience with lectures, in-class discussions and debates, group projects, a final paper, and an examination. Reflective writing assignments throughout the course required students to assimilate and apply what they had learned in the classroom to what they learned in their community placement. Assessment. Changes in students’ responses on pre- and post-course survey instruments reflected shifts toward higher-order thinking. Also, subjective student-learning modalities shifted toward learning by writing. Students’ perspectives and attitudes allowed improved context of issues associated with drug misuse and harm reduction models. Conclusion. Academic service-learning pedagogy contributes to developing adaptable, well-rounded, engaged learners who become more compassionate and pragmatic in addressing scientific and social questions relating to drug addiction. PMID:23610481
ERIC Educational Resources Information Center
RETHERFORD, ROBERT M.
DEAF MEN WHOSE HANDICAPS WERE BEYOND THE SCOPE OF AVAILABLE STATE SERVICES WERE ENROLLED IN A PROGRAM TO DEVELOP READINESS FOR VOCATIONAL REHABILITATION. THE 33 TRAINEES WERE GIVEN INSTRUCTION IN COMMUNICATION, READING, SOCIAL STUDIES, ARITHMETIC, SOCIAL ADJUSTMENT, OCCUPATIONAL TRAINING, DRIVER EDUCATION, AND PREEMPLOYMENT TRAINING. TRADITIONAL…
A Trial to Maximize the Accuracy of Military Womens Genitourinary Self-Diagnoses
2013-04-08
discharge , vaginal pH, and whiff tests as indicators for self-diagnosis of bacterial and yeast vaginitis .3 The 86 female civilian participants’ self...Principal Investigator: RYAN-WENGER, NANCY A. USU Project Number: HU0001-08-1-T507 1 TriService Nursing Research Program Final Report Cover Page... Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per
Technical Issues in Evolving to Integrated Services Digital Network (ISDN)
1991-06-01
channel through some Page 13 Technical Issues in Evolving to ISDN Final Report separate interface (such as the AT command set of the Hayes modems or the...errors experienced over standard modem provided connectivity. But, in this project connectivity has been established only over a single CO. Those...examined to some extent and are discussed below. Existing equipment was of two types: that which treats ISDN as just another leased line providing 56k or
1984-11-01
r .-. u S FINAL GENERIC ENVIROMENTAL IMPACT SlAiLMENT .XPLORAYION AND PRODUCTION OF HYDROCARBON RESOU CES IN COASTAL AIABAMA AND MISSISSIPPI The...a service could potentially affect cultural resources in the area of development. Prior to issuing any project permit, conflicts on potential impacts...34 Air Emission. 6-34 Noise 6-34 Solid and Hazardous Waste 6-34 Socioe -conomic Characteristics 6-34 Navigation 6-34 xxiv TABLE OF CONTENTS (Continued
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, E.W.
1987-10-01
Convincing commuters to join car or vanpools can be a challenging task. Through the Energy Authority project, two guides were produced to assist in establishing ride-sharing corporations and in marketing ride-sharing services in New York State. The first guide explains how to set up a ride-sharing corporation; the second guide, developed following the completion of a Commuter Behavior Study and a six-month demonstration, discusses marketing ride-share services. The Commuter Behavior Study centered on an 18-page questionnaire mailed to 6,000 households in Long Island and upstate New York. The study's findings were incorporated into a marketing plan followed by the contractor,more » Island Rides, a Long Island-based ridesharing corporation, during a six-month demonstration project. By using the promotional techniques identified in the study, Island Rides experienced a 68% increase in ride-sharing applications during this successful demonstration. The results of both the study and the demonstration are presented in the report.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, K.M.
1983-07-01
The number of workers currently involved in the various aspects of geothermal development in the Geysers are identified. Using two different development scenarios, projections are made for the number of power plants needed to reach the electrical generation capacity of the steam resource in the Geysers. The report also projects the cumulative number of workers needed to develop the steam field and to construct, operate, and maintain these power plants. Although the number of construction workers fluctuates, most are not likely to become new, permanent residents of the KGRA counties. The administrative and public service costs of geothermal development tomore » local jurisdications are examined, and these costs are compared to geothermal revenues accruing to the local governments. Revenues do not cover the immediate fiscal needs resulting from increases in local road maintenance and school enrollment attributable to geothermal development. Several mitigation options are discussed and a framework presented for calculating mitigation costs for school and road impacts.« less
ERIC Educational Resources Information Center
Washington Higher Education Coordinating Board, 2006
2006-01-01
This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…
The role of service learning in teaching and research for disaster-risk reduction
NASA Astrophysics Data System (ADS)
Suckale, J.; Saiyed, Z.; Alvisyahrin, T.; Hilley, G. E.; Muhari, A.; Zoback, M. L. C.; Truebe, S.
2016-12-01
An important motivation for natural-hazards research is to reduce threats posed by natural disasters to at-risk communities. Yet, we rarely teach students how research may be used to construct implementable solutions that reduce disaster risk. The goal of this contribution is to evaluate the potential of service learning to impart students with both the scientific background and the skills necessary to navigate real-world constraints of disaster risk reduction. We present results from a service-learning class taught at Stanford in the Winter quarter of 2016 in collaboration with the Indonesian Ministry of Marine Affairs and Fisheries and Syiah Kuala University, Banda Aceh. The main deliverable of the class was a final project in which students developed a specific idea of how to contribute to tsunami-risk reduction in Indonesia. A common critique of the service-learning approach posits that it may implicitly embed social and political perspectives within risk-reduction strategies that may be inappropriate within a particular culture. We attempted to avoid this problem using three strategies: First, we paired students from Stanford with students at Syiah Kuala University, Banda Aceh, to facilitate a close dialogue. Second, the Ministry of Marine Affairs and Fisheries provided a list of current risk-reduction strategies without requiring students to contribute to one specific project to minimally precondition project suggestions. Third, our community partners provided ongoing feedback on the scope and feasibility of the proposed projects and students were assessed based on their ability to integrate the feedback. Preliminary results from our class suggest significant promise for a service-learning approach to teaching disaster-risk reduction. There was substantial student interest in service learning, particularly among undergraduates. Pre-and post-assessment surveys showed that over 75% of students adjusted previous notions about disaster-risk reduction during the class. The course evaluations also provided several suggestions for improvement such as enabling more dialogue with community partners and better preparation prior to the class for our partner students at Syiah Kuala University that we will adopt in future iterations of the class.
5 CFR 470.311 - Final project approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...
[KIPKEL--an interdisciplinary ambulatory prevention project for children with mentally ill parents].
Staets, S; Hipp, M
2001-09-01
Children of psychiatrically ill parents up to now have hardly been perceived as a risk group. In order to prevent these children form becoming psychiatrically ill the practice for art-therapy and psychotherapy and the social psychiatric service of the city of Hilden have developed a programme for parents having children under 18 years of age in which at least one parent suffers from endogenous psychosis or severe personality disorder. The two initiators of the KIPKEL project describe the experiences they had during the preparatory phase and while securing the financial basis and building up solid structures of cooperation. The conceptual basis of the project and problems of practical realization are presented. Finally an example of a family who participated in the programme is given. It illustrates the complex arrangement of interpersonal relationship and the course of the carework.
Learning to listen: improving students' communication with disabled people.
Anderson, Elizabeth Susan; Ford, Jenny; Thorpe, Lucy
2011-01-01
This report outlines the action research used to develop a workshop for interprofessional student groups to enhance listening skills. The project aimed to enable students to reflect interprofessionally on the human factors central to effective communication using the power of storytelling by disabled people and their carers. Qualitative data from students and participating service users were collected using focus groups and one-to-one interviews over three pilot cycles. The results from each pilot informed the cyclical development of the project so that each stage of data collection informed the next stage. During the pilots, 20 interviews with service users were completed and a total of 109 students participated. Transcribed data were analysed using principles from grounded theory. Quantitative scored questions on students' learning were analysed using statistical package for the social sciences. Both students (health and social care) and users benefitted from the education process which delivered highly relevant explicit learning opportunities, with analysis of how to improve communication for safe practice. Students benefitted from meaningful interactions with service users who shared their experiences and gave feedback on students' communication skills. The final workshop design resulted in a learning model which reflects the human side of healthcare delivery.
Project Panama: An International Service Project
ERIC Educational Resources Information Center
Aydlett, Lydia; Randolph, Mickey; Wells, Gayle
2010-01-01
Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…
Admiral nursing competency project: practice development and action research.
Dewing, Jan; Traynor, Victoria
2005-07-01
Admiral Nurses are specialist dementia care nurses working in the community with carers of those who have a dementia. The aim of the competency project (2000-2003) was threefold. Firstly to work collaboratively with these specialist nurses to facilitate the development a competency framework that reflects the needs of the Admiral Nursing Service. Secondly, to provide a way to structure evidence demonstrating evolving competency. Thirdly, to specifically enable the nurses to demonstrate evidence of achieving the UK Nursing and Midwifery Council's Higher Level Practice standard. The two complementary approaches of emancipatory action research and systematic practice development were adopted. Methods were taken from action research and systematic practice development approaches with an emphasis on promoting and enabling enlightenment, critical reflection, ownership and creating the best conditions for long-term commitment to the competency framework. The main outcome from this project was the development of a specialist nursing competency framework. The Admiral Nurses' Competency Framework is made up of a set of eight core competencies with three levels of competency statements, loosely structured around the Higher Level Practice standard, and guidance documentation to illustrate how work-based evidence can be generated to demonstrate competence. There were also process-derived outcomes associated with combining systematic practice development with emancipatory action research that had an impact on the culture. The main outcomes here were that practitioners engaged in and experienced learning about how to research their own practice and the consequences of doing this. They also learnt about specialist nursing practice more widely than Admiral Nursing. Finally, there was some increase in awareness about the culture within their teams and organizations. The final competency framework reflects the needs of the service, is owned by the majority of practitioners and project commissioners and this has had a positive impact on implementation. In this paper, we report on combining systematic practice development with action research to achieve immediate project aims. In addition we show how a project of this nature can contribute to developing skills in practitioners necessary for cultural changes in practice and contributes to wider issues of modernization within nursing and health care. This competency framework will enable Admiral Nurses to demonstrate their level of specialist practice, as individuals and collectively as a service and it also promotes the principles of nurses as life long learners. This may have relevance to other groups of specialist nurses. The project has widespread relevance for two reasons. Firstly, it shows that nurses can be involved in designing and testing a competency framework as collaborators. Secondly, that to achieve this within the spirit of approaches, such as systematic practice development and action research, can be testing for all collaborators even were there is a shared or espoused aim.
Executing SADI services in Galaxy.
Aranguren, Mikel Egaña; González, Alejandro Rodríguez; Wilkinson, Mark D
2014-01-01
In recent years Galaxy has become a popular workflow management system in bioinformatics, due to its ease of installation, use and extension. The availability of Semantic Web-oriented tools in Galaxy, however, is limited. This is also the case for Semantic Web Services such as those provided by the SADI project, i.e. services that consume and produce RDF. Here we present SADI-Galaxy, a tool generator that deploys selected SADI Services as typical Galaxy tools. SADI-Galaxy is a Galaxy tool generator: through SADI-Galaxy, any SADI-compliant service becomes a Galaxy tool that can participate in other out-standing features of Galaxy such as data storage, history, workflow creation, and publication. Galaxy can also be used to execute and combine SADI services as it does with other Galaxy tools. Finally, we have semi-automated the packing and unpacking of data into RDF such that other Galaxy tools can easily be combined with SADI services, plugging the rich SADI Semantic Web Service environment into the popular Galaxy ecosystem. SADI-Galaxy bridges the gap between Galaxy, an easy to use but "static" workflow system with a wide user-base, and SADI, a sophisticated, semantic, discovery-based framework for Web Services, thus benefiting both user communities.
Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less
Northeast Oregon Hatchery Project, Final Siting Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Watson, Montgomery
1995-03-01
This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less
NASA Technical Reports Server (NTRS)
Hall, Edward; Isaacs, James; Henriksen, Steve; Zelkin, Natalie
2011-01-01
This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I (this document) is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.
1981-04-01
pollutants from the marina is the leaching of heavy metals and hydrocarbons from various antifouling paints used on boats. Contamination also occurs from...by pleasure boat, placing a heavy demand on moorage and services in the marina and at the town, providing a major source of income for the area. One...First Cost 4-10 d. Cost Apportionment 4-13 SECTION 5. COORDINATION 5.01 Coordination Framework 5-1 5.02 Coordination With Key Agencies 5-1 a
2008-11-01
the proposed site has the potential for adverse effects on surface water bodies in the event of a spill or uncontrolled erosion. Implementation of...inclusion of a No Action Alternative against which potential effects can be compared. While the No Action Alternative would not satisfy the purpose... potential effects on project site and adjacent land uses. The foremost factor affecting a proposed action in terms of land use is its compliance
Implementation of the Diabetes Practice Guideline in the Army Medical Department: Final Evaluation
2005-01-01
Diabetes Quality Improvement Project DRG Diagnosis-Related Group ER Emergency room FMP Family Member Prefix HBA1c Hemoglobin A1c HCSR Health-Care Service...glycemic control by assessing and managing glycosylated hemoglobin, reported as hemoglobin A1c ( HbA1c ) lev- els. Assess HbA1c levels relative to target...frequency involved in adjusting insulin dosages Increase in the percentage of noninsulin patients who fill prescribed medications to control HbA1c
2017-07-01
Department of Defense, civilian agencies, and our nation’s public good . Find out more at www.erdc.usace.army.mil. To search for other technical...new operating condition and extend the service ERDC/CERL TR-17-27 2 life of system components. Geopolymer mortars provide high structural...materials offer new, beneficial, and sustainable solutions for the repair and maintenance of DoD infrastructure. Geopolymers are composed of chains or
2009-04-01
completing in-person clinical assessments that include structured clinical interviews and psychological testing . As an introduction to the three...coordinator to opt out of the project. 2.2.2. Analyses of Response Bias. To test for response bias, we compared responders and non-responders to the...used to include these subjects without Wave 2 data in the final analyses. 2.3.2. Analyses of Response Bias. To test for response bias at Wave 3
48 CFR 552.232-72 - Final Payment Under Building Services Contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Building Services Contracts. 552.232-72 Section 552.232-72 Federal Acquisition Regulations System GENERAL... and Clauses 552.232-72 Final Payment Under Building Services Contracts. As prescribed in 532.904(c), insert the following clause: Final Payment Under Building Services Contracts (NOV 2009) Before final...
Gray, Dennis; Wilson, Mandy; Allsop, Steve; Saggers, Sherry; Wilkes, Edward; Ober, Coralie
2014-09-01
To review the results of five research projects commissioned to enhance alcohol treatment among Aboriginal Australians, and to highlight arising from them. Drafts of the papers were workshopped by project representatives, final papers reviewed and results summarised. Lessons arising were identified and described. While the impact of the projects varied, they highlight the feasibility of adapting mainstream interventions in Aboriginal Australian contexts. Outcomes include greater potential to: screen for those at risk; increase community awareness; build capacity and partnerships between organisations; and co-ordinate comprehensive referral networks and service provision. Results show a small investment can produce sustainable change and positive outcomes. However, to optimise and maintain investment, cultural difference needs to be recognised in both planning and delivery of alcohol interventions; resources and funding must be responsive to and realistic about the capacities of organisations; partnerships need to be formed voluntarily based on respect, equality and trust; and practices and procedures within organisations need to be formalised. There is no simple way to reduce alcohol-related harm in Aboriginal communities. However, the papers reviewed show that with Aboriginal control, modest investment and respectful collaboration, service enhancements and improved outcomes can be achieved. Mainstream interventions need to be adapted to Aboriginal settings, not simply transferred. The lessons outlined provide important reflections for future research. © 2014 Australasian Professional Society on Alcohol and other Drugs.
Security and Policy for Group Collaboration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ian Foster; Carl Kesselman
2006-07-31
“Security and Policy for Group Collaboration” was a Collaboratory Middleware research project aimed at providing the fundamental security and policy infrastructure required to support the creation and operation of distributed, computationally enabled collaborations. The project developed infrastructure that exploits innovative new techniques to address challenging issues of scale, dynamics, distribution, and role. To reduce greatly the cost of adding new members to a collaboration, we developed and evaluated new techniques for creating and managing credentials based on public key certificates, including support for online certificate generation, online certificate repositories, and support for multiple certificate authorities. To facilitate the integration ofmore » new resources into a collaboration, we improved significantly the integration of local security environments. To make it easy to create and change the role and associated privileges of both resources and participants of collaboration, we developed community wide authorization services that provide distributed, scalable means for specifying policy. These services make it possible for the delegation of capability from the community to a specific user, class of user or resource. Finally, we instantiated our research results into a framework that makes it useable to a wide range of collaborative tools. The resulting mechanisms and software have been widely adopted within DOE projects and in many other scientific projects. The widespread adoption of our Globus Toolkit technology has provided, and continues to provide, a natural dissemination and technology transfer vehicle for our results.« less
2014-06-05
The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority for a Rehabilitation Engineering Research Center (RERC) on Technologies to Enhance Independence in Daily Living for Adults with Cognitive Impairments. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to focus research attention on an area of national need. We intend the priority to contribute to improved outcomes related to independence in daily activities in the home, community, or workplace setting for adults with cognitive impairments.
2014-07-09
The Assistant Secretary for Special Education and Rehabilitative Services announces a priority under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority for a Rehabilitation Engineering Research Center (RERC) on Improving the Accessibility, Usability, and Performance of Technology for Individuals who are Deaf or Hard of Hearing. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to focus research attention on an area of national need. We intend the priority to contribute to improving the accessibility, usability, and performance of technology for individuals who are deaf or hard of hearing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seong, Hee Je; Choi, Seungmok
2015-10-09
This is a 3-way CRADA project working together with Corning, Inc. and Hyundai Motor Co. (HMC). The project is to understand particulate emissions from gasoline direct-injection engines (GDI) and their physico-chemical properties. In addition, this project focuses on providing fundamental information about filtration and regeneration mechanisms occurring in gasoline particulate filter (GPF) systems. For the work, Corning provides most advanced filter substrates for GPF applications and HMC provides three-way catalyst (TWC) coating services of these filter by way of a catalyst coating company. Then, Argonne National Laboratory characterizes fundamental behaviors of filtration and regeneration processes as well as evaluated TWCmore » functionality for the coated filters. To examine aging impacts on TWC and GPF performance, the research team evaluates gaseous and particulate emissions as well as back-pressure increase with ash loading by using an engine-oil injection system to accelerate ash loading in TWC-coated GPFs.« less
[The final situation in the Turkey "Stent for Life" project].
Ertaş, Gökhan; Kozan, Omer; Değertekin, Muzaffer; Kervan, Umit; Aksoy, Mehmet; Koç, Orhan; Göktekin, Omer
2012-09-01
The Stent for Life (SFL) project's main mission is to increase the use of primary percutaneous coronary intervention (PCI) in more than 70% of all acute ST segment elevation myocardial infarction (STEMI) patients. Previous to the SFL project, thrombolysis was the dominant reperfusion strategy since a low percentage of acute STEMI patients had access to primary PCI in our country. In this study, we present the main barriers of access to primary PCI in the centers that were involved with the SFL project. Patients with acute STEMI admitted to the centers that were involved in the SFL project between 2009 and 2011 were included in the analysis. Since the inception of the SFL project, the primary PCI rate has reached over 90% in SFL pilot cities. In the last 5 years, the number of ambulances and emergency stations has increased. Since the collaboration with 112 Emergency Service, a great majority of cases were reached via the emergency medical system. The mean door-to-balloon time for the pilot cities was 54.72±43.66 minutes. After three years of the SFL project, primary PCI has emerged as the preferred reperfusion strategy for patients with STEMI in pilot cities.
Husain, Nusrat; Gire, Nadeem; Kelly, James; Duxbury, Joy; McKeown, Mick; Riley, Miv; Taylor, Christopher Dj; Taylor, Peter J; Emsley, Richard; Farooq, Saeed; Caton, Neil; Naeem, Farooq; Kingdon, David; Chaudhry, Imran
2016-01-01
Technological advances in healthcare have shown promise when delivering interventions for mental health problems such as psychosis. The aim of this project is to develop a mobile phone intervention for people with psychosis and to conduct a feasibility study of the TechCare App. The TechCare App will assess participant's symptoms and respond with a personalised guided self-help-based psychological intervention with the aim of exploring feasibility and acceptability. The project will recruit 16 service users and 8-10 health professionals from the Lancashire Care NHS Foundation Trust Early Intervention Service. In strand 1 of the study, we will invite people to discuss their experience of psychosis and give their opinions on the existing evidence-based treatment (cognitive behavioural therapy) and how the mobile app can be developed. In strand 2, we will complete a test run with a small number of participants (n = 4) to refine the mobile intervention (TechCare). Finally, in strand 3 of the study, the TechCare App will be examined in a feasibility study with 12 participants. It has been suggested that there is a need for a rapid increase in the efforts to develop the evidence base for the clinical effectiveness of digital technologies, considering mHealth research can potentially be helpful in addressing the demand on mental health services globally.
Kandeh, H B; Leigh, B; Kanu, M S; Kuteh, M; Bangura, J; Seisay, A L
1997-11-01
An appraisal of government health facilities documented generally poor conditions, a shortage of drugs and supplies, and inadequate skills among staff. Focus group discussions in the community revealed a lack of knowledge about obstetric complications and difficulty in reaching health facilities. Improvements were made in services at primary health units (PHUs) through May 1993. Community motivators were trained in June and provided with bicycles and raingear in September 1993. Among their duties were community education, formation of village action groups for emergency transport and facilitation of referral for women with obstetric complications. Between August 1992 and December 1995, women with major complications seen at the PHUs increased from nine to 16 per month, with fluctuations due to disruptions in services and civil strife. The proportion of women with complications who were referred by the community motivators diminished over time, dropping from 24% to 1% over the first two years (1993-1994) and then recovering somewhat to 10% in the final period of observation. The cost of this intervention was approximately US$5082, with about half coming from the project and the rest from the government (44%) and the community (8%). The project improved utilization of the PHUs by women with complications, indicating that once services are of acceptable quality, many women will use them. The contribution of the motivators was positive, though smaller than expected.
Climate Data Service in the FP7 EarthServer Project
NASA Astrophysics Data System (ADS)
Mantovani, Simone; Natali, Stefano; Barboni, Damiano; Grazia Veratelli, Maria
2013-04-01
EarthServer is a European Framework Program project that aims at developing and demonstrating the usability of open standards (OGC and W3C) in the management of multi-source, any-size, multi-dimensional spatio-temporal data - in short: "Big Earth Data Analytics". In order to demonstrate the feasibility of the approach, six thematic Lighthouse Applications (Cryospheric Science, Airborne Science, Atmospheric/ Climate Science, Geology, Oceanography, and Planetary Science), each with 100+ TB, are implemented. Scope of the Atmospheric/Climate lighthouse application (Climate Data Service) is to implement the system containing global to regional 2D / 3D / 4D datasets retrieved either from satellite observations, from numerical modelling and in-situ observations. Data contained in the Climate Data Service regard atmospheric profiles of temperature / humidity, aerosol content, AOT, and cloud properties provided by entities such as the European Centre for Mesoscale Weather Forecast (ECMWF), the Austrian Meteorological Service (Zentralanstalt für Meteorologie und Geodynamik - ZAMG), the Italian National Agency for new technologies, energies and sustainable development (ENEA), and the Sweden's Meteorological and Hydrological Institute (Sveriges Meteorologiska och Hydrologiska Institut -- SMHI). The system, through an easy-to-use web application permits to browse the loaded data, visualize their temporal evolution on a specific point with the creation of 2D graphs of a single field, or compare different fields on the same point (e.g. temperatures from different models and satellite observations), and visualize maps of specific fields superimposed with high resolution background maps. All data access operations and display are performed by means of OGC standard operations namely WMS, WCS and WCPS. The EarthServer project has just started its second year over a 3-years development plan: the present status the system contains subsets of the final database, with the scope of demonstrating I/O modules and visualization tools. At the end of the project all datasets will be available to the users.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, E.W.; Matthews, N.P.
1987-10-01
The intent of this project was to develop, demonstrate and evaluate marketing techniques for the establishment of ridesharing corporations in New York State. The objectives of the first phase of the project were to: (1) develop a ''how-to'' guide for establishing a ridesharing corporation; and (2) conduct a market assessment to identify specific methods for capturing potential users of the service. The objectives of the second phase of the project were to: (1) prepare and implement a marketing strategy to address the various major users and evaluate the viability of new marketing techniques developed in Phase 1 and marketing techniquesmore » developed during the first year of operations; and (2) develop and disseminate a ''how-to'' guide regarding the development, implementation and evaluation of marketing strategies for ridesharing in New York State.« less
NASA Astrophysics Data System (ADS)
Scala, Antonio
2015-03-01
We introduce the concept of self-healing in the field of complex networks modelling; in particular, self-healing capabilities are implemented through distributed communication protocols that exploit redundant links to recover the connectivity of the system. Self-healing is a crucial in implementing the next generation of smart grids allowing to ensure a high quality of service to the users. We then map our self-healing procedure in a percolation problem and analyse the interplay between redundancies and topology in improving the resilience of networked infrastructures to multiple failures. We find exact results both for planar lattices and for random lattices, hinting the role of duality in the design of resilient networks. Finally, we introduce a cavity method approach to study the recovery of connectivity after damage in self-healing networks. CNR-PNR National Project ``Crisis-Lab,'' EU HOME/2013/CIPS/AG/4000005013 project CI2C and EU FET project MULTIPLEX nr.317532.
Creative Partnerships for Funding Nursing Research
McCann, Judith J.; Hills, Elizabeth Blanchard; Zauszniewski, Jaclene A.; Smith, Carol E.; Farran, Carol J.; Wilkie, Diana J.
2013-01-01
The Small Business Innovation Research (SBIR) program and the Small Business Technology Transfer Research (STTR) program are two federal funding mechanisms that some nurses in academic positions have used to support research and development of innovative nursing products or services. Both the SBIR and STTR mechanisms are excellent sources of funding for nurse researchers who want to capitalize on relationships with small businesses or obtain seed money to fund high risk projects with potential to attract new venture capital. This paper provides an overview of NIH-funded SBIR and STTR programs and summarizes similarities and differences between the programs. The paper also describes unique features of NIH SBIR and STTR funding mechanisms that differentiate them from other R-series funding mechanisms, reviews evaluation criteria for SBIR and STTR projects, and discusses critical partners and resources for proposal development. Finally, the paper describes characteristics of successful partnerships and provides examples of SBIR/STTR-funded projects. PMID:20719996
Creative partnerships for funding nursing research.
McCann, Judith J; Hills, Elizabeth Blanchard; Zauszniewski, Jaclene A; Smith, Carol E; Farran, Carol J; Wilkie, Diana J
2011-02-01
The Small Business Innovation Research (SBIR) program and the Small Business Technology Transfer Research (STTR) program are two federal funding mechanisms that some nurses in academic positions have used to support research and development of innovative nursing products or services. Both the SBIR and STTR mechanisms are excellent sources of funding for nurse researchers who want to capitalize on relationships with small businesses or obtain seed money to fund high-risk projects with potential to attract new venture capital. This article provides an overview of National Institutes of Health (NIH)-funded SBIR and STTR programs and summarizes similarities and differences between the programs. The article also describes unique features of NIH SBIR and STTR funding mechanisms that differentiate them from other R-series funding mechanisms, reviews evaluation criteria for SBIR and STTR projects, and discusses critical partners and resources for proposal development. Finally, the article describes characteristics of successful partnerships and provides examples of SBIR/STTR-funded projects.
1987-06-15
001 GENERAL DYNAMICS 00 FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Repc t JUNG 0 ?7 PROJECT 28 AUTOMATION...DYNAMICS FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Report PROJECT 28 AUTOMATION OF RECEIVING, RECEIVING...13 6 PROJECT ASSUMPTIONS 20 7 PRELIMINARY/FINAL DESIGN AND FINDINGS 21 8 SYSTEM/EQUIPMENT/MACHINING SPECIFICATIONS 37 9 VENDOR/ INDUSTRY ANALYSIS
The Wide-area Energy Management System Phase 2 Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.
2010-08-31
The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resultingmore » system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.« less
Increasing Prediction the Original Final Year Project of Student Using Genetic Algorithm
NASA Astrophysics Data System (ADS)
Saragih, Rijois Iboy Erwin; Turnip, Mardi; Sitanggang, Delima; Aritonang, Mendarissan; Harianja, Eva
2018-04-01
Final year project is very important forgraduation study of a student. Unfortunately, many students are not seriouslydidtheir final projects. Many of studentsask for someone to do it for them. In this paper, an application of genetic algorithms to predict the original final year project of a studentis proposed. In the simulation, the data of the final project for the last 5 years is collected. The genetic algorithm has several operators namely population, selection, crossover, and mutation. The result suggest that genetic algorithm can do better prediction than other comparable model. Experimental results of predicting showed that 70% was more accurate than the previous researched.
NASA Astrophysics Data System (ADS)
Benninghoff, Heike; Rems, Florian; Risse, Eicke; Brunner, Bernhard; Stelzer, Martin; Krenn, Rainer; Reiner, Matthias; Stangl, Christian; Gnat, Marcin
2018-01-01
In the framework of a project called on-orbit servicing end-to-end simulation, the final approach and capture of a tumbling client satellite in an on-orbit servicing mission are simulated. The necessary components are developed and the entire end-to-end chain is tested and verified. This involves both on-board and on-ground systems. The space segment comprises a passive client satellite, and an active service satellite with its rendezvous and berthing payload. The space segment is simulated using a software satellite simulator and two robotic, hardware-in-the-loop test beds, the European Proximity Operations Simulator (EPOS) 2.0 and the OOS-Sim. The ground segment is established as for a real servicing mission, such that realistic operations can be performed from the different consoles in the control room. During the simulation of the telerobotic operation, it is important to provide a realistic communication environment with different parameters like they occur in the real world (realistic delay and jitter, for example).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuohy, Aidan; Smith, Jeff; Rylander, Matt
2016-07-11
Increasing levels of distributed and utility scale Solar Photovoltaics (PV) will have an impact on many utility functions, including distribution system operations, bulk system performance, business models and scheduling of generation. In this project, EPRI worked with Southern Company Services and its affiliates and the Tennessee Valley Authority to assist these utilities in their strategic planning efforts for integrating PV, based on modeling, simulation and analysis using a set of innovative tools. Advanced production simulation models were used to investigate operating reserve requirements. To leverage existing work and datasets, this last task was carried out on the California system. Overall,more » the project resulted in providing useful information to both of the utilities involved and through the final reports and interactions during the project. The results from this project can be used to inform the industry about new and improved methodologies for understanding solar PV penetration, and will influence ongoing and future research. This report summarizes each of the topics investigated over the 2.5-year project period.« less
The EuroGEOSS Advanced Operating Capacity
NASA Astrophysics Data System (ADS)
Nativi, S.; Vaccari, L.; Stock, K.; Diaz, L.; Santoro, M.
2012-04-01
The concept of multidisciplinary interoperability for managing societal issues is a major challenge presently faced by the Earth and Space Science Informatics community. With this in mind, EuroGEOSS project was launched on May 1st 2009 for a three year period aiming to demonstrate the added value to the scientific community and society of providing existing earth observing systems and applications in an interoperable manner and used within the GEOSS and INSPIRE frameworks. In the first period, the project built an Initial Operating Capability (IOC) in the three strategic areas of Drought, Forestry and Biodiversity; this was then enhanced into an Advanced Operating Capacity (AOC) for multidisciplinary interoperability. Finally, the project extended the infrastructure to other scientific domains (geology, hydrology, etc.). The EuroGEOSS multidisciplinary AOC is based on the Brokering Approach. This approach aims to achieve multidisciplinary interoperability by developing an extended SOA (Service Oriented Architecture) where a new type of "expert" components is introduced: the Broker. These implement all mediation and distribution functionalities needed to interconnect the distributed and heterogeneous resources characterizing a System of Systems (SoS) environment. The EuroGEOSS AOC is comprised of the following components: • EuroGEOSS Discovery Broker: providing harmonized discovery functionalities by mediating and distributing user queries against tens of heterogeneous services; • EuroGEOSS Access Broker: enabling users to seamlessly access and use heterogeneous remote resources via a unique and standard service; • EuroGEOSS Web 2.0 Broker: enhancing the capabilities of the Discovery Broker with queries towards the new Web 2.0 services; • EuroGEOSS Semantic Discovery Broker: enhancing the capabilities of the Discovery Broker with semantic query-expansion; • EuroGEOSS Natural Language Search Component: providing users with the possibilities to search for resources using natural language queries; • Service Composition Broker: allowing users to compose and execute complex Business Processes, based on the technology developed by the FP7 UncertWeb project. Recently, the EuroGEOSS Brokering framework was presented at the GEO-VIII Plenary and Exhibition in Istanbul and introduced into the GEOSS Common Infrastructure.
1994-01-12
This final rule with comment period permits States flexibility to revise the process by which incurred medical expenses are considered to reduce an individual's or family's income to become Medicaid eligible. This process is commonly referred to as "spenddown." Only States which cover the medically needy, and States which use more restrictive criteria to determine eligibility of the aged, blind, and disabled, than the criteria used to determine eligibility for Supplemental Security Income (SSI) benefits (section 1902(f) States) have a spenddown. These revisions permit States to: Consider as incurred medical expenses projected institutional expenses at the Medicaid reimbursement rate, and deduct those projected expenses from income in determining eligibility; combine the retroactive and prospective medically needy budget periods; either include or exclude medical expenses incurred earlier than the third month before the month of application (States must, however, deduct current payments on old bills not previously deducted in any budget period); and deduct incurred medical expenses from income in the order in which the services were provided, in the order each bill is submitted to the agency, by type of service. All States with medically needy programs using the criteria of the SS program may implement any of the provisions. States using more restrict criteria than the SSI program under section 1902(f) of the Social Security Act may implement all of these provisions except for the option to exclude medical expenses incurred earlier than the third month before the month of application.
Evaluation of Future Internet Technologies for Processing and Distribution of Satellite Imagery
NASA Astrophysics Data System (ADS)
Becedas, J.; Perez, R.; Gonzalez, G.; Alvarez, J.; Garcia, F.; Maldonado, F.; Sucari, A.; Garcia, J.
2015-04-01
Satellite imagery data centres are designed to operate a defined number of satellites. For instance, difficulties when new satellites have to be incorporated in the system appear. This occurs because traditional infrastructures are neither flexible nor scalable. With the appearance of Future Internet technologies new solutions can be provided to manage large and variable amounts of data on demand. These technologies optimize resources and facilitate the appearance of new applications and services in the traditional Earth Observation (EO) market. The use of Future Internet technologies for the EO sector were validated with the GEO-Cloud experiment, part of the Fed4FIRE FP7 European project. This work presents the final results of the project, in which a constellation of satellites records the whole Earth surface on a daily basis. The satellite imagery is downloaded into a distributed network of ground stations and ingested in a cloud infrastructure, where the data is processed, stored, archived and distributed to the end users. The processing and transfer times inside the cloud, workload of the processors, automatic cataloguing and accessibility through the Internet are evaluated to validate if Future Internet technologies present advantages over traditional methods. Applicability of these technologies is evaluated to provide high added value services. Finally, the advantages of using federated testbeds to carry out large scale, industry driven experiments are analysed evaluating the feasibility of an experiment developed in the European infrastructure Fed4FIRE and its migration to a commercial cloud: SoftLayer, an IBM Company.
An Academic Club Service Learning Project as a Demonstration of Experiential Teaching Tools
ERIC Educational Resources Information Center
Bonczek, James L.; Snyder, Lori Unruh; Ellis, Larry R.
2007-01-01
We describe our pedagogical approaches and experiences with an academic club service learning project (one semester, 20 club participants, including both graduate students and lower and upper-level undergraduates). Our service learning project responds to the recent demand for more community service-based club projects within the College of…
Harris, Claire; Allen, Kelly; Brooke, Vanessa; Dyer, Tim; Waller, Cara; King, Richard; Ramsey, Wayne; Mortimer, Duncan
2017-05-25
This is the sixth in a series of papers reporting Sustainability in Health care by Allocating Resources Effectively (SHARE) in a local healthcare setting. The SHARE program was established to investigate a systematic, integrated, evidence-based approach to disinvestment within a large Australian health service. This paper describes the methods employed in undertaking pilot disinvestment projects. It draws a number of lessons regarding the strengths and weaknesses of these methods; particularly regarding the crucial first step of identifying targets for disinvestment. Literature reviews, survey, interviews, consultation and workshops were used to capture and process the relevant information. A theoretical framework was adapted for evaluation and explication of disinvestment projects, including a taxonomy for the determinants of effectiveness, process of change and outcome measures. Implementation, evaluation and costing plans were developed. Four literature reviews were completed, surveys were received from 15 external experts, 65 interviews were conducted, 18 senior decision-makers attended a data gathering workshop, 22 experts and local informants were consulted, and four decision-making workshops were undertaken. Mechanisms to identify disinvestment targets and criteria for prioritisation and decision-making were investigated. A catalogue containing 184 evidence-based opportunities for disinvestment and an algorithm to identify disinvestment projects were developed. An Expression of Interest process identified two potential disinvestment projects. Seventeen additional projects were proposed through a non-systematic nomination process. Four of the 19 proposals were selected as pilot projects but only one reached the implementation stage. Factors with potential influence on the outcomes of disinvestment projects are discussed and barriers and enablers in the pilot projects are summarised. This study provides an in-depth insight into the experience of disinvestment in one local healthcare service. To our knowledge, this is the first paper to report the process of disinvestment from identification, through prioritisation and decision-making, to implementation and evaluation, and finally explication of the processes and outcomes.
Resource Aware Intelligent Network Services (RAINS) Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehman, Tom; Yang, Xi
The Resource Aware Intelligent Network Services (RAINS) project conducted research and developed technologies in the area of cyber infrastructure resource modeling and computation. The goal of this work was to provide a foundation to enable intelligent, software defined services which spanned the network AND the resources which connect to the network. A Multi-Resource Service Plane (MRSP) was defined, which allows resource owners/managers to locate and place themselves from a topology and service availability perspective within the dynamic networked cyberinfrastructure ecosystem. The MRSP enables the presentation of integrated topology views and computation results which can include resources across the spectrum ofmore » compute, storage, and networks. The RAINS project developed MSRP includes the following key components: i) Multi-Resource Service (MRS) Ontology/Multi-Resource Markup Language (MRML), ii) Resource Computation Engine (RCE), iii) Modular Driver Framework (to allow integration of a variety of external resources). The MRS/MRML is a general and extensible modeling framework that allows for resource owners to model, or describe, a wide variety of resource types. All resources are described using three categories of elements: Resources, Services, and Relationships between the elements. This modeling framework defines a common method for the transformation of cyber infrastructure resources into data in the form of MRML models. In order to realize this infrastructure datification, the RAINS project developed a model based computation system, i.e. “RAINS Computation Engine (RCE)”. The RCE has the ability to ingest, process, integrate, and compute based on automatically generated MRML models. The RCE interacts with the resources thru system drivers which are specific to the type of external network or resource controller. The RAINS project developed a modular and pluggable driver system which facilities a variety of resource controllers to automatically generate, maintain, and distribute MRML based resource descriptions. Once all of the resource topologies are absorbed by the RCE, a connected graph of the full distributed system topology is constructed, which forms the basis for computation and workflow processing. The RCE includes a Modular Computation Element (MCE) framework which allows for tailoring of the computation process to the specific set of resources under control, and the services desired. The input and output of an MCE are both model data based on MRS/MRML ontology and schema. Some of the RAINS project accomplishments include: Development of general and extensible multi-resource modeling framework; Design of a Resource Computation Engine (RCE) system which includes the following key capabilities; Absorb a variety of multi-resource model types and build integrated models; Novel architecture which uses model based communications across the full stack for all Flexible provision of abstract or intent based user facing interfaces; Workflow processing based on model descriptions; Release of the RCE as an open source software; Deployment of RCE in the University of Maryland/Mid-Atlantic Crossroad ScienceDMZ in prototype mode with a plan under way to transition to production; Deployment at the Argonne National Laboratory DTN Facility in prototype mode; Selection of RCE by the DOE SENSE (SDN for End-to-end Networked Science at the Exascale) project as the basis for their orchestration service.« less