Assessment of Options for Enhancing Surface Ship Acquisition.
1996-03-01
propulsion control, cargo handling, and the ship’s self defense capability. Cost growth was 50 percent even with a reduction from 9 ships to 5. For...technology, high - value weapon and sensor systems Cargo Arrangements Every area of ship densely packed with equipment, cables, pipes, ventilation...acquisition reform has a high potential to improve the outcomes of ship acquisition programs. Progress has been made in the reduction of military
2015-12-01
Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-374 Littoral Combat Ship (LCS) As of FY 2017 President’s Budget Defense Acquisition...Management Information Retrieval (DAMIR) UNCLASSIFIED LCS December 2015 SAR UNCLASSIFIED 2 Table of Contents Common Acronyms and Abbreviations for...and Support PAUC - Program Acquisition Unit Cost LCS December 2015 SAR UNCLASSIFIED 3 PB - President’s Budget PE - Program Element PEO - Program
Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress
2004-10-28
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Defense Acquisition University David D. Acker Library...program, it had decided to award the contract for the next phase on a sole-source basis to NGSS . The Navy has also stated that “The ship construction...contracts will be allocated equally between NGSS and BIW for the first six ships... and will be Cost Plus Incentive Fee (CPIF) type contracts.... The
Littoral Combat Ship Mission Modules (LCS MM)
2015-12-01
Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-443 Littoral Combat Ship Mission Modules (LCS MM) As of FY 2017 President’s Budget Defense...Acquisition Management Information Retrieval (DAMIR) March 9, 2016 08:50:12 UNCLASSIFIED LCS MM December 2015 SAR March 9, 2016 08:50:12 UNCLASSIFIED...Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost LCS MM December 2015 SAR March 9
LHA 6 America Class Amphibious Assault Ship (LHA 6)
2015-12-01
Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-333 LHA 6 America Class Amphibious Assault Ship (LHA 6) As of FY 2017 President’s Budget...Defense Acquisition Management Information Retrieval (DAMIR) March 8, 2016 09:40:04 UNCLASSIFIED LHA 6 December 2015 SAR March 8, 2016 09:40:04...Requirements Document OSD - Office of the Secretary of Defense O&S - Operating and Support PAUC - Program Acquisition Unit Cost LHA 6 December 2015 SAR March
48 CFR 225.7003-2 - Restrictions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 225.7003-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts, Appropriations Acts, and...) Missile or space systems. (3) Ships. (4) Tank or automotive items. (5) Weapon systems. (6) Ammunition. (b...
48 CFR 225.7003-2 - Restrictions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 225.7003-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts, Appropriations Acts, and...) Missile or space systems. (3) Ships. (4) Tank or automotive items. (5) Weapon systems. (6) Ammunition. (b...
48 CFR 225.7003-2 - Restrictions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 225.7003-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts, Appropriations Acts, and...) Missile or space systems. (3) Ships. (4) Tank or automotive items. (5) Weapon systems. (6) Ammunition. (b...
48 CFR 225.7003-2 - Restrictions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 225.7003-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts, Appropriations Acts, and...) Missile or space systems. (3) Ships. (4) Tank or automotive items. (5) Weapon systems. (6) Ammunition. (b...
48 CFR 225.7003-2 - Restrictions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 225.7003-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts, Appropriations Acts, and...) Missile or space systems. (3) Ships. (4) Tank or automotive items. (5) Weapon systems. (6) Ammunition. (b...
48 CFR 225.7003-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contract clauses. 225.7003-5 Section 225.7003-5 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts...: (A) Aircraft. (B) Missile or space systems. (C) Ships. (D) Tank or automotive items. (E) Weapon...
48 CFR 225.7003-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... contract clauses. 225.7003-5 Section 225.7003-5 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts...: (A) Aircraft. (B) Missile or space systems. (C) Ships. (D) Tank or automotive items. (E) Weapon...
48 CFR 225.7003-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contract clauses. 225.7003-5 Section 225.7003-5 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts...: (A) Aircraft. (B) Missile or space systems. (C) Ships. (D) Tank or automotive items. (E) Weapon...
48 CFR 225.7003-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... contract clauses. 225.7003-5 Section 225.7003-5 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts...: (A) Aircraft. (B) Missile or space systems. (C) Ships. (D) Tank or automotive items. (E) Weapon...
48 CFR 225.7003-5 - Solicitation provision and contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... contract clauses. 225.7003-5 Section 225.7003-5 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts...: (A) Aircraft. (B) Missile or space systems. (C) Ships. (D) Tank or automotive items. (E) Weapon...
2016-12-08
States Government Accountability Office United States Government Accountability Office Highlights of GAO-17-279T, a testimony before the...million in defects for each ship. Time will tell whether this amount is sufficient to account for discovered defects.6 Turning to cost and schedule...279T Year GAO recommendation DOD response 2010 • Update the LCS acquisition strategy to account for operational testing delays in the program
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2011-03-18
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library Of Congress,101...Deepwater Acquisition into asset-based Acquisition Program Baselines, the proposed changes align projects that were formerly grouped under...Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2011-04-14
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of Congress...disaggregation of the Deepwater Acquisition into asset-based Acquisition Program Baselines, the proposed changes align projects that were formerly grouped...industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ
Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress
2006-03-07
PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service The...New Orleans and a third facility at Gulfport, MS, form Northrop Grumman’s Ship Systems ( NGSS ) division. The Navy has not procured any frigates since...the program, it had decided to award the contract for the next phase on a sole-source basis to Northrop Grumman’s Ship Systems ( NGSS ) division, which
2016-04-30
fåÑçêãÉÇ=`Ü~åÖÉ= - 194 - Panel 16. Improving Governance of Complex Systems Acquisition Thursday, May 5, 2016 11:15 a.m. – 12:45 p.m. Chair: Rear...Admiral David Gale, USN, Program Executive Officer, SHIPS Complex System Governance for Acquisition Joseph Bradley, President, Leading Change, LLC...Bryan Moser, Lecturer, MIT John Dickmann, Vice President, Sonalysts Inc. A Complex Systems Perspective of Risk Mitigation and Modeling in
Two-Bin Kanban: Ordering Impact at Navy Medical Center San Diego
2016-06-17
pretest (2013 data set) and posttest (2015 data set) analysis to avoid having the findings influenced by price changes. DMLSS does not track shipping...statistics based on those observations (Kabacoff, 2011, p. 112). Replacing the groups of observations with summary statistics allows the analyst...listed on the Acquisition Research Program website (www.acquisitionresearch.net). Acquisition Research Program Graduate School of Business & Public
Are Ships Different? Policies and Procedures for the Acquisition of Ship Programs
2011-01-01
for that system.” These provisions appear to recognize differences in the timing of design maturity, con- currency of design and production (for the...focused on primary mission areas (Annex 2-D, p. 27). Certain items are exempt from T&E provisions due to testing by others: Crypto - graphic or
DOT National Transportation Integrated Search
2009-07-01
The Deepwater Program includes efforts to build or modernize ships and aircraft and to procure other capabilities. In 2002, the Coast Guard contracted with Integrated Coast Guard Systems (ICGS) to manage the acquisition as systems integrator. After a...
48 CFR 1371.118 - Changes-ship repair.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Changes-ship repair. 1371.118 Section 1371.118 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.118 Changes—ship repair. Insert clause...
What’s The Hold Up Reconciling Acquisition Timeline Differences
2016-02-16
methods might limit the flexibility of acquisition programs in terms of schedule and budget, resulting in a situation where program execution is...adapt to 12 future challenges.44 The intent, from the start, was to design for affordability, but Congress added a wrinkle . There were only two...54 The team attacked on all fronts. Two examples of their work follow. A redesign of the ship itself and modification to the construction method
Navy Enhanced Sierra Mechanics (NESM): Toolbox for predicting Navy shock and damage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moyer, Thomas; Stergiou, Jonathan; Reese, Garth
Here, the US Navy is developing a new suite of computational mechanics tools (Navy Enhanced Sierra Mechanics) for the prediction of ship response, damage, and shock environments transmitted to vital systems during threat weapon encounters. NESM includes fully coupled Euler-Lagrange solvers tailored to ship shock/damage predictions. NESM is optimized to support high-performance computing architectures, providing the physics-based ship response/threat weapon damage predictions needed to support the design and assessment of highly survivable ships. NESM is being employed to support current Navy ship design and acquisition programs while being further developed for future Navy fleet needs.
Navy Enhanced Sierra Mechanics (NESM): Toolbox for predicting Navy shock and damage
Moyer, Thomas; Stergiou, Jonathan; Reese, Garth; ...
2016-05-25
Here, the US Navy is developing a new suite of computational mechanics tools (Navy Enhanced Sierra Mechanics) for the prediction of ship response, damage, and shock environments transmitted to vital systems during threat weapon encounters. NESM includes fully coupled Euler-Lagrange solvers tailored to ship shock/damage predictions. NESM is optimized to support high-performance computing architectures, providing the physics-based ship response/threat weapon damage predictions needed to support the design and assessment of highly survivable ships. NESM is being employed to support current Navy ship design and acquisition programs while being further developed for future Navy fleet needs.
Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress
2005-04-21
6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research...between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. Several Members...premature” a Navy proposal to hold a one-time, winner-take-all competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics
Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress
2005-06-24
6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research...competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. The...competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s
Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress
2005-01-25
PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The...the contract for the next phase on a sole-source basis to NGSS . The first DD(X) would be built by Northrop/Ingalls, while the second would be built...by GD/BIW. The Navy has also stated that “The ship construction contracts will be allocated equally between NGSS and BIW for the first six ships
48 CFR 1371.118 - Changes-ship repair.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Changes-ship repair. 1371... SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.118 Changes—ship repair. Insert clause 1352.271-87, Changes—Ship Repair, in all solicitations and...
48 CFR 1371.118 - Changes-ship repair.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Changes-ship repair. 1371... SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.118 Changes—ship repair. Insert clause 1352.271-87, Changes—Ship Repair, in all solicitations and...
48 CFR 1371.118 - Changes-ship repair.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Changes-ship repair. 1371... SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.118 Changes—ship repair. Insert clause 1352.271-87, Changes—Ship Repair, in all solicitations and...
48 CFR 1371.118 - Changes-ship repair.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Changes-ship repair. 1371... SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.118 Changes—ship repair. Insert clause 1352.271-87, Changes—Ship Repair, in all solicitations and...
48 CFR 1371.102 - Method of payment and invoicing instructions for ship repair.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Method of payment and invoicing instructions for ship repair. 1371.102 Section 1371.102 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.102...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2011 CFR
2011-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2014 CFR
2014-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2012 CFR
2012-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2013 CFR
2013-10-01
... ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF... Contracting for Construction 1336.270 Special requirements for ship construction See 48 CFR 1371 for special requirements for acquisition involving ship construction and ship repair. ...
greater danger near shore or any shallow waters? NOAA PORTS PROGRAM The Physical Oceanographic Real-Time navigation by providing ship masters and pilots with accurate real-time information required to avoid data acquisition and dissemination systems that provide real-time water levels, currents, and other
48 CFR 209.270 - Aviation and ship critical safety items.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Aviation and ship critical safety items. 209.270 Section 209.270 Federal Acquisition Regulations System DEFENSE ACQUISITION... Requirements 209.270 Aviation and ship critical safety items. ...
48 CFR 209.270 - Aviation and ship critical safety items.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Aviation and ship critical safety items. 209.270 Section 209.270 Federal Acquisition Regulations System DEFENSE ACQUISITION... Requirements 209.270 Aviation and ship critical safety items. ...
48 CFR 209.270 - Aviation and ship critical safety items.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Aviation and ship critical safety items. 209.270 Section 209.270 Federal Acquisition Regulations System DEFENSE ACQUISITION... Requirements 209.270 Aviation and ship critical safety items. ...
48 CFR 209.270 - Aviation and ship critical safety items.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Aviation and ship critical safety items. 209.270 Section 209.270 Federal Acquisition Regulations System DEFENSE ACQUISITION... Requirements 209.270 Aviation and ship critical safety items. ...
48 CFR 209.270 - Aviation and ship critical safety items.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Requirements 209.270 Aviation and ship critical safety items. ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Aviation and ship critical safety items. 209.270 Section 209.270 Federal Acquisition Regulations System DEFENSE ACQUISITION...
Naval Air Systems Command Needs to Improve Management of Waiver Requests (REDACTED)
2015-05-15
Acquisition Category ID5 major defense acquisition program that had its final production decision on January 3, 2014. The Navy designed the P -8A...submarines, was the primary reason the Navy invested in the P -8A aircraft. The anti-surface warfare mission provides maritime superiority 5 Acquisition ...frigates (small, fast military ships) at 110 nautical miles, which was one of the critical technical parameters. Also, the P -8A aircraft that was
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seetho, Isaac M.; Brown, William D.; Martz, Jr., Harry E.
This document is a short summary of the steps required for MicroCT evaluation of a specimen. This includes data acquisition through image analysis, for the EXD HME program. Expected outputs for each stage are provided. Data shall be shipped to LLNL as described herein.
Tailoring and Critical Thinking - Key Principles for Acquisition Success
2015-10-01
Defense AT&L: September–October 2015 6 Tailoring and Critical Thinking— Key Principles for Acquisition Success Mike Kotzian, D.M. n Michael Paul...well as program success . 7 Defense AT&L: September–October 2015 The Long Range Anti-Ship Missile Opportunity To ensure DARPA maintains its ability... successful flight demonstra- tions that initially proved the technical approach. Concurrent with these technical accomplishments came two important
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 213 RIN 0750-AH07 Defense Federal Acquisition Regulation Supplement; Ships Bunkers Easy Acquisition (SEA) Card[supreg] and Aircraft Ground Services (DFARS Case 2009-D019) AGENCY: Defense Acquisition Regulations System, Department of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 213 RIN 0750-AH07 Defense Federal Acquisition Regulation Supplement; Ships Bunkers Easy Acquisition (SEA) Card[supreg] and Aircraft Ground Services (DFARS Case 2009-D019) AGENCY: Defense Acquisition Regulations System, Department of...
Defense Acquisitions: Assessments of Selected Weapon Programs
2016-03-01
Increment 3 81 Indirect Fire Protection Capability Increment 2-Intercept Block 1 (IFPC Inc 2-I Block 1) 83 Improved Turbine Engine Program (ITEP...ITEP Improved Turbine Engine Program JAGM Joint Air-to-Ground Missile JLTV Joint Light Tactical Vehicle JSTARS Recap Joint Surveillance Target...Attack Radar System Recap 09/2017 —- Improved Turbine Engine Program 06/2018 O O O Amphibious Ship Replacement 09/2018 O O Advanced Pilot
GPHS-RTGs in support of the Cassini Mission
NASA Astrophysics Data System (ADS)
1994-10-01
The progress on the radioisotope generators and ancillary activities is described. This report is organized by program task as follows: spacecraft integration and liaison; engineering support; safety; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; design, reviews, and mission applications; project management, quality assurance and reliability, contract changes, non-capital CAGO acquisition, and CAGO maintenance; contractor acquired government owned property (CAGO) acquisition.
48 CFR 1352.271-87 - Changes-ship repair.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Changes-ship repair. 1352.271-87 Section 1352.271-87 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CLAUSES AND...—ship repair. As prescribed in 48 CFR 1371.118, insert the following clause: Changes—Ship Repair (APR...
48 CFR 1352.271-87 - Changes-ship repair.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Changes-ship repair. 1352.271-87 Section 1352.271-87 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CLAUSES AND...—ship repair. As prescribed in 48 CFR 1371.118, insert the following clause: Changes—Ship Repair (APR...
48 CFR 1352.271-87 - Changes-ship repair.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Changes-ship repair. 1352.271-87 Section 1352.271-87 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CLAUSES AND...—ship repair. As prescribed in 48 CFR 1371.118, insert the following clause: Changes—Ship Repair (APR...
48 CFR 1352.271-87 - Changes-ship repair.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Changes-ship repair. 1352.271-87 Section 1352.271-87 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CLAUSES AND...—ship repair. As prescribed in 48 CFR 1371.118, insert the following clause: Changes—Ship Repair (APR...
Littoral Combat Ship and Frigate: Congress Faced with Critical Acquisition Decisions
2016-12-01
D.C.: Mar. 1, 2005). 3Lockheed Martin is the prime contractor for LCS 1 and the odd numbered seaframes. For LCS 2 and LCS 4, General Dynamics was...the prime contractor for the Austal USA built ships. General Dynamics and Austal USA ended their teaming arrangement in 2010. Austal USA is the...prime contractor for the remaining even-numbered seaframes. The Course of the LCS Program Has Changed Significantly over Time Page 3 GAO
GPHS-RTGs in support of the Cassini mission
NASA Astrophysics Data System (ADS)
1994-04-01
This report is organized by the program task structure as follows: (1) spacecraft integration and liaison; (2) engineering support; (3) safety; (4) qualified unicouple fabrication; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance and reliability, contract changes, noncapital contractor acquired government owned property (CAGO) acquisition, and CAGO maintenance; and (10) CAGO acquisition.
Navy DD(X), GC(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress
2005-08-18
5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) David D. Acker Library and Knowledge...System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build all DD(X)s. The Emergency Supplemental Appropriations Act...take-all competition between Northrop Grumman’s Ship System Division ( NGSS ) and General Dynamics’ Bath Iron Works (GD/BIW) for the right to build
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2009-12-23
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library of Congress...Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ) contract for the Deepwater program that...sustainment is not a Deepwater program but is displayed to align with the FY2009 Consolidated Security, Disaster Assistance, and Continuing Appropriations
Code of Federal Regulations, 2010 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Title. 1371.111 Section... REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.111 Title. Insert clause 1352.271-80, Title, in all solicitations and contracts for ship repair. ...
NASA Astrophysics Data System (ADS)
Arevalo, S.; Atwood, C.; Bell, P.; Blacker, T. D.; Dey, S.; Fisher, D.; Fisher, D. A.; Genalis, P.; Gorski, J.; Harris, A.; Hill, K.; Hurwitz, M.; Kendall, R. P.; Meakin, R. L.; Morton, S.; Moyer, E. T.; Post, D. E.; Strawn, R.; Veldhuizen, D. v.; Votta, L. G.; Wynn, S.; Zelinski, G.
2008-07-01
In FY2008, the U.S. Department of Defense (DoD) initiated the Computational Research and Engineering Acquisition Tools and Environments (CREATE) program, a 360M program with a two-year planning phase and a ten-year execution phase. CREATE will develop and deploy three computational engineering tool sets for DoD acquisition programs to use to design aircraft, ships and radio-frequency antennas. The planning and execution of CREATE are based on the 'lessons learned' from case studies of large-scale computational science and engineering projects. The case studies stress the importance of a stable, close-knit development team; a focus on customer needs and requirements; verification and validation; flexible and agile planning, management, and development processes; risk management; realistic schedules and resource levels; balanced short- and long-term goals and deliverables; and stable, long-term support by the program sponsor. Since it began in FY2008, the CREATE program has built a team and project structure, developed requirements and begun validating them, identified candidate products, established initial connections with the acquisition programs, begun detailed project planning and development, and generated the initial collaboration infrastructure necessary for success by its multi-institutional, multidisciplinary teams.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Lay days. 1371.117 Section... REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.117 Lay days. Insert clause 1352.271-86, Lay Days, in all solicitations and contracts for ship repair. ...
48 CFR 52.247-60 - Guaranteed Shipping Characteristics.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Guaranteed Shipping Characteristics. 52.247-60 Section 52.247-60 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... information will be used to determine transportation costs for evaluation purposes. If the offeror does not...
48 CFR 52.247-60 - Guaranteed Shipping Characteristics.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Guaranteed Shipping Characteristics. 52.247-60 Section 52.247-60 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... information will be used to determine transportation costs for evaluation purposes. If the offeror does not...
48 CFR 242.1403 - Shipping documents covering f.o.b. origin shipments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Shipping documents covering f.o.b. origin shipments. 242.1403 Section 242.1403 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT...
48 CFR 1352.271-87 - Changes-ship repair.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Changes-ship repair. 1352.271-87 Section 1352.271-87 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-87 Changes—ship repair. As prescribed in 48 CFR 1371.118,...
Integration of SAR and AIS for ship detection and identification
NASA Astrophysics Data System (ADS)
Yang, Chan-Su; Kim, Tae-Ho
2012-06-01
This abstract describes the preliminary design concept for an integration system of SAR and AIS data. SAR sensors are used to acquire image data over large coverage area either through the space borne or airborne platforms in UTC. AIS reports should also obtained on the same date as of the SAR acquisition for the purpose to perform integration test. Once both data reports are obtained, one need to match the timings of AIS data acquisition over the SAR image acquisition time with consideration of local time & boundary to extract the closest time signal from AIS report in order to know the AIS based ship positions, but still one cannot be able to distinguish which ships have the AIS transponder after projection of AIS based position onto the SAR image acquisition boundary. As far as integration is concerned, the ship dead-reckoning concept is most important forecasted position which provides the AIS based ship position at the time of SAR image acquisition and also provides the hints for azimuth shift which occurred in SAR image for the case of moving ships which moves in the direction perpendicular to the direction of flight path. Unknown ship's DR estimation is to be carried out based on the initial positions, speed and course over ground, which has already been shorted out from AIS reports, during the step of time matching. This DR based ship's position will be the candidate element for searching the SAR based ship targets for the purpose of identification & matching within the certain boundary around DR. The searching method is performed by means of estimation of minimum distance from ship's DR to SAR based ship position, and once it determines, so the candidate element will look for matching like ship size match of DR based ship's dimension wrt SAR based ship's edge, there may be some error during the matching with SAR based ship edges with actual ship's hull design as per the longitudinal and transverse axis size information obtained from the AIS reports due to blurring effect in SAR based ship signatures, once the conditions are satisfied, candidate element will move & shift over the SAR based ship signature target with the minimum displacement and it is known to be the azimuth shift compensation and this overall methodology are known to be integration of AIS report data over the SAR image acquisition boundary with assessment of time matching. The expected result may provide the good accuracy of the SAR and AIS contact position along with dimension and classification of ships over SAR image. There may be possibilities of matching speed and course from candidate element with SAR based ship signature, but still the challenges are presents in front of us that to estimation of speed and course by means of SAR data, if it may be possible so the expected final result may be more accurate as due to extra matching effects and the results may be used for the near real time performance for ship identification with help of integrated system design based on SAR and AIS data reports.
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2009-10-23
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of...role to Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an...icebreaker sustainment is not a Deepwater program but is displayed to align with the FY2009 Consolidated Security, Disaster Assistance, and
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2009-07-22
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library of Congress,101...an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID...program but is displayed to align with the FY2009 Consolidated Security, Disaster Assistance, and Continuing Appropriations Act, P.L. 110-329.” b
Navy DD(X), CG(X), and LCS Ship Acquisition Programs: Oversight Issues and Options for Congress
2006-02-28
NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional...Systems ( NGSS ) division. The Navy has not procured any frigates since FY1984, when the last FFG-7 was procured. 20 In earlier years, some Navy surface...Defense for Acquisition, Technology, and Logistics (USD AT&L) in February 2004, the first DD(X) would be built by NGSS , the second DD(X) would be built GD
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2009-05-29
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library of Congress,101...Guard awarded the role to Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ...states that “Polar icebreaker sustainment is not a Deepwater program but is displayed to align with the FY2009 Consolidated Security, Disaster
NASA Astrophysics Data System (ADS)
Bijl, Piet; Toet, Alexander; Kooi, Frank L.
2016-10-01
Visual images of a civilian target ship on a sea background were produced using a CAD model. The total set consisted of 264 images and included 3 different color schemes, 2 ship viewing aspects, 5 sun illumination conditions, 2 sea reflection values, 2 ship positions with respect to the horizon and 3 values of atmospheric contrast reduction. In a perception experiment, the images were presented on a display in a long darkened corridor. Observers were asked to indicate the range at which they were able to detect the ship and classify the following 5 ship elements: accommodation, funnel, hull, mast, and hat above the bridge. This resulted in a total of 1584 Target Acquisition (TA) range estimates for two observers. Next, the ship contour, ship elements and corresponding TA ranges were analyzed applying several feature size and contrast measures. Most data coincide on a contrast versus angular size plot using (1) the long axis as characteristic ship/ship feature size and (2) local Weber contrast as characteristic ship/ship feature contrast. Finally, the data were compared with a variety of visual performance functions assumed to be representative for Target Acquisition: the TOD (Triangle Orientation Discrimination), MRC (Minimum Resolvable Contrast), CTF (Contrast Threshold Function), TTP (Targeting Task Performance) metric and circular disc detection data for the unaided eye (Blackwell). The results provide strong evidence for the TOD case: both position and slope of the TOD curve match the ship detection and classification data without any free parameter. In contrast, the MRC and CTF are too steep, the TTP and disc detection curves are too shallow and all these curves need an overall scaling factor in order to coincide with the ship and ship feature recognition data.
48 CFR 1371.105 - Foreseeable cost factors pertaining to different shipyard locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... pertaining to different shipyard locations. 1371.105 Section 1371.105 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP... locations. Insert provision 1352.271-74, Foreseeable Cost Factors Pertaining to Different Shipyard Locations...
48 CFR 1371.105 - Foreseeable cost factors pertaining to different shipyard locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... pertaining to different shipyard locations. 1371.105 Section 1371.105 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP... locations. Insert provision 1352.271-74, Foreseeable Cost Factors Pertaining to Different Shipyard Locations...
48 CFR 1371.105 - Foreseeable cost factors pertaining to different shipyard locations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... pertaining to different shipyard locations. 1371.105 Section 1371.105 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP... locations. Insert provision 1352.271-74, Foreseeable Cost Factors Pertaining to Different Shipyard Locations...
48 CFR 1371.105 - Foreseeable cost factors pertaining to different shipyard locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... pertaining to different shipyard locations. 1371.105 Section 1371.105 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP... locations. Insert provision 1352.271-74, Foreseeable Cost Factors Pertaining to Different Shipyard Locations...
48 CFR 1371.105 - Foreseeable cost factors pertaining to different shipyard locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... pertaining to different shipyard locations. 1371.105 Section 1371.105 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP... locations. Insert provision 1352.271-74, Foreseeable Cost Factors Pertaining to Different Shipyard Locations...
Knowledge Management in Acquisition and Program Management (KM in the AM and PM)
2002-01-01
a clumping of clusters.16 If all the planets in a solar system had moons, the moons would be the people, each planet would be a discipline or cluster...exploration, one looks for non-obvious, unknown relation- ships in a data set. The discovery that cus- tomers frequently buy beer and diapers to- gether from
Navy DDG-1000 and DDG-51 Destroyer Programs: Background, Oversight Issues, and Options for Congress
2008-10-09
of the House Armed Services Committee, Navy officials announced a major change in the service’s position on what kind of destroyers it wants to...among other things, the addition of a new software program for the Aegis combat system and the arming of the ship with the SM-3, a version of the...Expeditionary Forces of the House Armed Services Committee, on Surface Combatant Requirements and Acquisition Strategies, July 31, 2008, 11 pp., and the spoken
GPHS-RTGs in support of the Cassini RTG Program
NASA Astrophysics Data System (ADS)
1995-04-01
The technical progress achieved during the period 26 Sep. 1994 - 2 Apr. 1995 on Contract DE-AC03-91SF-18852 Radioisotope Thermoelectric Generators and Ancillary Activities is described herein. Monthly technical activity for the period 27 Feb. - 2 Apr. 1995 is included in this progress report. The report addresses tasks, including: spacecraft integration and liaison; engineering support; safety; qualified unicouple production; ETG fabrication, assembly, and test; ground support equipment; RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and CAGO acquisition (capital funds).
48 CFR 1371.101 - Inspection and manner of doing work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Inspection and manner of... DEPARTMENT SUPPLEMENTAL REGULATIONS ACQUISITIONS INVOLVING SHIP CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.101 Inspection and manner of doing work. Insert clause 1352.271-70, Inspection and Manner of...
48 CFR 1336.270 - Special requirements for ship construction
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Special requirements for ship construction 1336.270 Section 1336.270 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 1336.270 Special...
48 CFR 47.305-16 - Shipping characteristics.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Shipping characteristics... CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.305-16 Shipping characteristics... shipments of agreed size. (b) Guaranteed shipping characteristics. (1) The contracting officer shall insert...
Defense Acquisition Research Journal. Volume 23, Number 4, Issue 79, October 2016
2016-10-01
the final word on ship design decisions, including critical operational requirements and costs. Kuehn provides a captivating description of how the...requires using material from primary sources, including program documents, policy papers, memoranda, surveys , interviews, etc. Articles are...instrument, • describe the limitations of the research, • ensure results are quantitative and qualitative, • determine if the study can be replicated, and
Behavior analysis of container ship in maritime accident in order to redefine the operating criteria
NASA Astrophysics Data System (ADS)
Ancuţa, C.; Stanca, C.; Andrei, C.; Acomi, N.
2017-08-01
In order to enhance the efficiency of maritime transport, container ships operators proceeded to increase the sizes of ships. The latest generation of ships in operation has 19,000 TEU capacity and the perspective is 21,000 TEU within the next years. The increasing of the sizes of container ships involves risks of maritime accidents occurrences. Nowadays, the general rules on operational security, tend to be adjusted as a result of the evaluation for each vessel. To create the premises for making an informed decision, the captain have to be aware of ships behavior in such situations. Not less important is to assure permanent review of the procedures for operation of ship, including the specific procedures in special areas, confined waters or separation schemes. This paper aims at analysing the behavior of the vessel and the respond of the structure of a container ship in maritime accident, in order to redefine the operating criteria. The method selected by authors for carrying out the research is computer simulations. Computer program provides the responses of the container ship model in various situations. Therefore, the simulations allow acquisition of a large category of data, in the scope of improving the prevention of accidents or mitigation of effects as much as possible. Simulations and assessments of certain situations that the ship might experience will be carried out to redefine the operating criteria. The envisaged scenarios are: introducing of maneuver speed for specific areas with high risk of collision or grounding, introducing of flooding scenarios of some compartments in loading programs, conducting of complex simulations in various situations for each vessel type. The main results of this work are documented proposals for operating criteria, intended to improve the safety in case of marine accidents, collisions and groundings. Introducing of such measures requires complex cost benefit analysis, that should not neglect the extreme economic impact that may result from such casualties.
A Comparison of the Ship System Acquisition Process of the Greek Navy and US Navy.
1984-12-01
ADDRESS 10. PROGRAM ELEMENT, PROJECT, TASK AREA & WORK UNIT NUMBERS Naval Postgraduate School Monterey, California 93943 II. CONTROLLING OFFICE NAME AND...Approved by: ------ so -- -- -= B T= ag -- - - Department of Administrative Sciences Dean of Information and Poliy Sciences 3...for their attentive assistance in all phases of this work . Furthermore, I would like tc express my sincere content- ment to: o My wife Katerina who
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2011-01-14
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library Of Congress...Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery, indefinite quantity (ID/IQ) contract for the Deepwater...Deepwater assets. The Coast Guard’s own management policies are generally aligned with DHS directives, although operational testing policies are still
48 CFR 1371.113 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2013 CFR
2013-10-01
... occupational safety and health standards for ship repair. 1371.113 Section 1371.113 Federal Acquisition... CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.113 Department of Labor occupational safety and health standards for ship repair. Insert clause 1352.271-82, Department of Labor Occupational Safety and Health...
48 CFR 1371.113 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2012 CFR
2012-10-01
... occupational safety and health standards for ship repair. 1371.113 Section 1371.113 Federal Acquisition... CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.113 Department of Labor occupational safety and health standards for ship repair. Insert clause 1352.271-82, Department of Labor Occupational Safety and Health...
48 CFR 1371.113 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2014 CFR
2014-10-01
... occupational safety and health standards for ship repair. 1371.113 Section 1371.113 Federal Acquisition... CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.113 Department of Labor occupational safety and health standards for ship repair. Insert clause 1352.271-82, Department of Labor Occupational Safety and Health...
48 CFR 1371.113 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2011 CFR
2011-10-01
... occupational safety and health standards for ship repair. 1371.113 Section 1371.113 Federal Acquisition... CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.113 Department of Labor occupational safety and health standards for ship repair. Insert clause 1352.271-82, Department of Labor Occupational Safety and Health...
48 CFR 1371.113 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2010 CFR
2010-10-01
... occupational safety and health standards for ship repair. 1371.113 Section 1371.113 Federal Acquisition... CONSTRUCTION AND SHIP REPAIR Provisions and Clauses 1371.113 Department of Labor occupational safety and health standards for ship repair. Insert clause 1352.271-82, Department of Labor Occupational Safety and Health...
48 CFR 1352.271-71 - Method of payment and invoicing instructions for ship repair.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Method of payment and invoicing instructions for ship repair. 1352.271-71 Section 1352.271-71 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1352.271-71 Method of...
48 CFR 1252.217-80 - Department of Labor Safety and Health Regulations for Ship Repairing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Department of Labor Safety and Health Regulations for Ship Repairing. 1252.217-80 Section 1252.217-80 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 1252.217-80...
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2010-10-22
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of...Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was awarded an indefinite delivery...The Coast Guard’s own management policies are generally aligned with DHS directives, although operational testing policies are still being revised
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2010-09-29
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of...the role to Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was...of individual Deepwater assets. The Coast Guard’s own management policies are generally aligned with DHS directives, although operational testing
Linking Logistics and Operations: A Case Study of World War II Air Power
1991-01-01
Weapon System Evaluation Group, 1951, p. 30). The logistic innovation greatly extended the time that combat ships could remain on station and...presented. This Note was produced under the Project AIR FORCE Resource Management and System Acquisition Program in the project "Combat Support C3 Needs...maintenance workload data suggest either unacceptable system performance or excessive costs. The predictive power of these models is so poor as to
A Qualitative Study of Affordability: Virginia and San Antonio Class Programs
2014-06-04
uncertain aspects of the life- cycle cost estimates, ensuring that actual costs and operational tempos resemble original assumptions is the most...total inventory, a typical variation for ships from the acquisition standard of 10%. Even though the Virginia-class has incurred only a fraction of the...Policy - 119 - Naval Postgraduate School REFERENCES 10 U.S.C. § 181 (1997). Birkler, J., Schank, J., Smith, G., Timson, F., Chiesa, J., Goldberg
A Qualitative Study of Affordability: Virginia and San Antonio Class Programs
2014-06-01
that actual costs and operational tempos resemble original assumptions is the most uncertain aspect of sustainment costs. Operators must respond to a...SSN 774 through SSN 787; this represents 47% of the total inventory, a typical variation for ships from the acquisition standard of 10%. Even... Goldberg , M., … MacKinnon, M. (1994). The U.S. submarine production base (MR-456-OSD). Santa Monica, CA: RAND. Blickstein, I. United States. Department
A flexible computerized system for environmental data acquisition and transmission
NASA Astrophysics Data System (ADS)
Zappalà, G.
2009-04-01
In recent years increasing importance has been addressed to the knowledge of the marine environment, either to help detecting and understanding global climate change phenomena, or to protect and preserve those coastal areas, where multiple interests converge (linked to the tourism, recreational or productive activities…) and which suffer greater impact from anthropogenic activities; this has in turn stimulated the start of research programs devoted to the monitoring and surveillance of these particular zones, coupling the needs for knowledge, sustainable development and exploitation of natural resources. There is an increasing need to have data available in real time or near real time in order to intervene in emergency situations. Cabled or wireless data transmission can be used. The first allows the transmission of a higher amount of data only in coastal sites, while the second gives a bigger flexibility in terms of application to different environments; more, using mobile phone services (either terrestrial or satellite), it is possible to allocate the data centre in the most convenient place, without any need of proximity to the sea. Traditional oceanographic techniques, based on ship surveys, hardly fit the needs of operational oceanography, because of their high cost and fragmentary nature, both in spatial and temporal domains. To obtain a good synopticity, it is necessary to complement traditional ship observations with measurements from fixed stations (buoys moored in sites chosen to be representative of wider areas, or to constitute a sentinel against the arrival of pollutants), satellite observations, use of ships of opportunity and of newly developed instruments, like the gliders, or towed sliding devices, like the SAVE. Modern instruments rely on an electronic heart; an integrated hardware-software system developed in Messina is here presented, used in various versions to control data acquisition and transmission on buoys or on ship-based instrumentation. The data acquisition and transmission system is based on IEEE P996.1 standard boards, implementing a PC-like architecture; basically, it consists in a Pentium family CPU (the fist prototypes used a 40 MHz 386 CPU), a variable number of RS-232 ports to connect measuring instruments and communication devices, an analog to digital converter (8 inputs 12 or 16 bit), power outputs with connected circuit status feedback to drive actuators and switch on and off the measuring systems, satellite and/or cellular phone modem, GPS; the mass storage is supplied by Disk on Chip (DOC) devices. According to the needs, it can be fully or only partly implemented. The software environment is Datalight ROMDOS v. 6, an MS-DOS compatible Operating System. The software has been written in Microsoft Professional Compiled BASIC v. 7.1. and Microsoft Macro Assembler v. 5.0. It enables to fully control the system instruments both in local and remote mode using a special set of macro commands (that can be combined into sequences using a simple text editor) that include also conditional execution of branches; this feature can be very useful in case of partial operativity of the system due, for instance, to low battery level or failure of some instrument. Available commands include: • System management commands • Instrument management commands • Conditional branch commands • Data transmission commands Collected data are locally stored and can be transmitted as e-mails, so increasing their safety against loosing and making the global data path fault tolerant using the peculiarities of the e-mail system. The first version was used in a network of coastal monitoring buoys funded by the Italian SAM program; a second one to equip an automatic multiple launcher for expendable probes to be used in ships of opportunity, designed and built in the framework of an EU funded program, "MFSTEP". Every hour, a "sequence manager" starts a macro-command sequence, that can be different for each time and is remotely reprogrammable; new releases of the software and of the sequences are uploadable to the station without suspending its normal activity. The macro-commands enable to manage the data acquisition and transmission, the mission programming, the station hardware and the measuring instruments. In the "launcher" version the program also controls real time and position acquisition, comparison against set points-times, launch, data acquisition and transmission, ancillary functions. The whole system can be connected to another computer (local laptop or remote desktop) using a terminal software; however, to fully and easily use its capabilities, a remote control program has been written in Microsoft Visual Basic, running in Windows environment. This program enables to transfer files to and from the measuring system, set up all its functionalities, and, if needed, take control of all the system operations. Thanks to the PC-like hardware architecture, it is easy to upgrade the system to more powerful processors without the need to modify the software, which, in turn, can be easily programmed using standard development packages.
48 CFR 245.7101-2 - DD Form 1149, Requisition and Invoice Shipping Document.
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Plant Clearance Forms 245.7101-2 DD Form 1149, Requisition and Invoice Shipping Document. Use for transfer and donation of contractor inventory. Donations of industrial plant equipment may be shipped via...
46 CFR 315.5 - Appointment of agents.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Agent by MARAD, the contracting office shall transmit the Service Agreement or Ship Manager contract to... Agreement and Ship Manager Contract may be obtained from the Office of Acquisition at the address appearing... appointment as General Agent, Berth Agent or Ship Manager may be obtained from, and inquiries and other...
46 CFR 315.5 - Appointment of agents.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Agent by MARAD, the contracting office shall transmit the Service Agreement or Ship Manager contract to... Agreement and Ship Manager Contract may be obtained from the Office of Acquisition at the address appearing... appointment as General Agent, Berth Agent or Ship Manager may be obtained from, and inquiries and other...
46 CFR 315.5 - Appointment of agents.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Agent by MARAD, the contracting office shall transmit the Service Agreement or Ship Manager contract to... Agreement and Ship Manager Contract may be obtained from the Office of Acquisition at the address appearing... appointment as General Agent, Berth Agent or Ship Manager may be obtained from, and inquiries and other...
Coast Guard Deepwater Acquisition Programs: Background, Oversight Issues, and Options for Congress
2010-03-30
NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,Library of Congress,101...awarded the role to Integrated Coast Guard Systems (ICGS)—an industry team led by Lockheed Martin and Northrop Grumman Ship Systems ( NGSS ). ICGS was...Systems Command] and in April 2009. We continue to build on lessons learned and are making some significant improvements to the Stratton, including
Pratt, Thomas L.; Meagher, Karen L.; Brocher, Thomas M.; Yelin, Thomas; Norris, Robert; Hultgrien, Lynn; Barnett, Elizabeth; Weaver, Craig S.
2003-01-01
This report describes seismic data obtained during the fourth Seismic Hazard Investigation of Puget Sound (SHIPS) experiment, termed Seattle SHIPS . The experiment was designed to study the influence of the Seattle sedimentary basin on ground shaking during earthquakes. To accomplish this, we deployed seismometers over the basin to record local earthquakes, quarry blasts, and teleseisms during the period of January 26 to May 27, 2002. We plan to analyze the recordings to compute spectral amplitudes at each site, to determine the variability of ground motions over the basin. During the Seattle SHIPS experiment, seismometers were deployed at 87 sites in a 110-km-long east-west line, three north-south lines, and a grid throughout the Seattle urban area (Figure 1). At each of these sites, an L-22, 2-Hz velocity transducer was installed and connected to a REF TEK Digital Acquisition System (DAS), both provided by the Program for Array Seismic Studies of the Continental Lithosphere (PASSCAL) of the Incorporated Research Institutes for Seismology (IRIS). The instruments were installed on January 26 and 27, and were retrieved gradually between April 18 and May 27. All instruments continuously sampled all three components of motion (velocity) at a sample rate of 50 samples/sec. To ensure accurate computations of amplitude, we calibrated the geophones in situ to obtain the instrument responses. In this report, we discuss the acquisition of these data, we describe the processing and merging of these data into 1-hour long traces and into windowed events, we discuss the geophone calibration process and its results, and we display some of the earthquake recordings.
48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2014 CFR
2014-10-01
... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...
48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2011 CFR
2011-10-01
... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...
48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2013 CFR
2013-10-01
... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...
48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2012 CFR
2012-10-01
... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...
48 CFR 1352.271-82 - Department of Labor occupational safety and health standards for ship repair.
Code of Federal Regulations, 2010 CFR
2010-10-01
... occupational safety and health standards for ship repair. 1352.271-82 Section 1352.271-82 Federal Acquisition... of Provisions and Clauses 1352.271-82 Department of Labor occupational safety and health standards... Occupational Safety and Health Standards for Ship Repair (APR 2010) The contractor, in performance of all work...
Identifying Governance Best Practices in Systems-of-Systems Acquisition
2014-02-08
Acquisition Governance ................................................ 28 Figure 3. Harvest Hercules Airborne Weapons Kit System Components ...... 39 ...acquisition poses considerable challenges that the current Department of Defense (DoD) acquisition governance structure was not necessarily designed to...specify the warship it needed along with the design , construction, and outfitting of the ship. The Navy managed and performed production operations and
2016-06-01
of and replace. DOD maintains weapon systems (e.g., aircraft and ships) and equipment (e.g., generators and radars) that require regular and...including helicopters, combat vehicles, air defense systems, ships, fighter and bomber aircraft , intercontinental ballistic missiles, jet aircraft ...Defense for Acquisition, Technology, and Logistics. 19In the depot maintenance context, an end item can be a weapon system, such as an aircraft , ship
48 CFR 246.471 - Authorizing shipment of supplies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... supplies. 246.471 Section 246.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance... contract administration office signs or stamps the shipping papers that accompany Government source...
48 CFR 246.471 - Authorizing shipment of supplies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... supplies. 246.471 Section 246.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance... contract administration office signs or stamps the shipping papers that accompany Government source...
48 CFR 246.471 - Authorizing shipment of supplies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... supplies. 246.471 Section 246.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance... contract administration office signs or stamps the shipping papers that accompany Government source...
48 CFR 246.471 - Authorizing shipment of supplies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... supplies. 246.471 Section 246.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance... contract administration office signs or stamps the shipping papers that accompany Government source...
48 CFR 246.471 - Authorizing shipment of supplies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... supplies. 246.471 Section 246.471 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance... contract administration office signs or stamps the shipping papers that accompany Government source...
48 CFR 1371.107 - Performance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Performance. 1371.107 Section 1371.107 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL... Performance. Insert clause 1352.271-76, Performance, in all solicitations and contracts for ship construction...
48 CFR 1371.107 - Performance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Performance. 1371.107 Section 1371.107 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL... Performance. Insert clause 1352.271-76, Performance, in all solicitations and contracts for ship construction...
48 CFR 1371.107 - Performance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Performance. 1371.107 Section 1371.107 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL... Performance. Insert clause 1352.271-76, Performance, in all solicitations and contracts for ship construction...
48 CFR 1371.107 - Performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance. 1371.107 Section 1371.107 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL... Performance. Insert clause 1352.271-76, Performance, in all solicitations and contracts for ship construction...
48 CFR 1371.107 - Performance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Performance. 1371.107 Section 1371.107 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL... Performance. Insert clause 1352.271-76, Performance, in all solicitations and contracts for ship construction...
SES Multi-Purpose Ship Study. Transport Application. Volume 1. Technical Summary.
1980-07-01
suitability for marine applications. Aluminum provides the lightest structure but the material cost is high, fabrication relatively difficult, the structure...and its application in Mili- tary Transportb and was prepared by the staff of the Navy’s Surface Effect Ship Acquisition Proje~~he study report...manu- facture of large surface effect craft, and a wealth of corporate knowledge and * expertise residing in the U.S. Navy Surface Effect Ships
2006-10-01
trial has provided a vast and valuable polarimetric data set that has and will be beneficial to the study of polarimetric signatures of ships. iv...following polarimetric issues are relevant to the Polar Epsilon CONOPS and will be studied further: • The effects of acquisition geometry, target...between minimum detectable ship size and area coverage rate. Therefore, vessel detection will be dependent upon beam mode selection. The vessel
Geodetic VLBI observations at Simeiz station
NASA Astrophysics Data System (ADS)
Volvach, A.; Petrov, L.; Nesterov, N.
Very long baseline interferometry (VLBI) observations under international geodetic programs are carried out at Simeiz station since June 1994. 22-m radiotelescope is equipped by dual-band S/X receivers, hydrogen maser CH-70 and data acquisition terminal Mark-IIIA. Observations are conducted by 24 hours sessions scheduled 6-15 times per year. Observational programs are a part of common efforts for maintenance of terrestrial reference frame, celestial reference frame and monitoring Earth orientation parameters carried out by international community under the auspices of International VLBI Service (IVS). Data are recorded on magnetic tapes which are shipped to correlator centers for further correlation and fringing. Fringed data are archived and are freely available via Internet for scientific analysis after 1-2 months after observations.
An Analysis of Purchasing Systems at the Ship Level in the United States and Hellenic Navies
2014-12-01
ABBREVIATIONS AT&L acquisition, technology, and logistics BPA blanket purchase agreement BBP better buying power DOD Department of Defense FC Fleet...the ships can also solicit and award formal contracts or blanket purchase agreements ( BPA )— BPA are charging accounts with selected suppliers for the
77 FR 58150 - Granting of Relief; Federal Firearms Privileges (2011R-13T)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
... the disabilities imposed by Federal laws by the Director of ATF with respect to the acquisition... certain persons from shipping or transporting any firearm in interstate or foreign commerce, or receiving any firearm which has been shipped or transported in interstate or foreign commerce, or possessing any...
HSI top-down requirements analysis for ship manpower reduction
NASA Astrophysics Data System (ADS)
Malone, Thomas B.; Bost, J. R.
2000-11-01
U.S. Navy ship acquisition programs such as DD 21 and CVNX are increasingly relying on top down requirements analysis (TDRA) to define and assess design approaches for workload and manpower reduction, and for ensuring required levels of human performance, reliability, safety, and quality of life at sea. The human systems integration (HSI) approach to TDRA begins with a function analysis which identifies the functions derived from the requirements in the Operational Requirements Document (ORD). The function analysis serves as the function baseline for the ship, and also supports the definition of RDT&E and Total Ownership Cost requirements. A mission analysis is then conducted to identify mission scenarios, again based on requirements in the ORD, and the Design Reference Mission (DRM). This is followed by a mission/function analysis which establishes the function requirements to successfully perform the ship's missions. Function requirements of major importance for HSI are information, performance, decision, and support requirements associated with each function. An allocation of functions defines the roles of humans and automation in performing the functions associated with a mission. Alternate design concepts, based on function allocation strategies, are then described, and task networks associated with the concepts are developed. Task network simulations are conducted to assess workloads and human performance capabilities associated with alternate concepts. An assessment of the affordability and risk associated with alternate concepts is performed, and manning estimates are developed for feasible design concepts.
48 CFR 1371.104 - Schedule of work.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Schedule of work. 1371.104 Section 1371.104 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE DEPARTMENT SUPPLEMENTAL... of work. Insert clause 1352.271-73, Schedule of Work, in all solicitations and contracts for ship...
NASA Technical Reports Server (NTRS)
Balch, William M.
2001-01-01
One of the greatest challenges in providing sea-truth data for various ocean color sensors is climatology. This is particularly true in the Gulf of Maine since it is cloudy and foggy more than it is clear; the climatology shows on average, about one in four to five days has clear skies with clear days slightly more frequent in the late summer and early fall. Our strategy has been to use a ship of opportunity where one has choice of the sampling days. This provides much better flexibility to sample during clear periods with good satellite coverage. Our Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) contract has been to use the M/S Scotia Prince ferry as a ship of opportunity, running between Portland, Maine and Yarmouth, NS. Measurements include continuous, surface, along-track fluorescence, two independent measures of backscattering, total light scattering, absorption, beam attenuation, above-water remote sensing reflectance, calcite-dependent light scattering, temperature, and salinity. Expendable bathythermography (XBT) drops allow acquisition of vertical temperature information, useful for defining isopycnal slope, which affects primary production. These data are comparable to a previous program from early 1982, where a ship of opportunity program (SOOP) was run on the truck ferry, M/V Marine Evangeline, which ran along the same transect. These surface data were combined with satellite-derived sea surface temperature fields to examine the Maine coastal current. Unfortunately, this program stopped in 1982. The ongoing SIMBIOS results will dovetail nicely with the previous work (which also had Coastal Zone Color Scanner (CZCS) coverage) for looking at any long-term changes in the Gulf of Maine hydrography, bio-optics, and biogeochemistry.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-30
... #0;#0;Federal Register / Vol. 77 , No. 19 / Monday, January 30, 2012 / Proposed Rules#0;#0; [[Page...: Proposed rule. SUMMARY: DoD is proposing to amend the Defense Federal Acquisition Regulation Supplement... relocate the coverage within the DFARS. DATES: Comment Date: Comments on the proposed rule should be...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
...; or (iii) An uncommanded engine shutdown that jeopardizes safety. Design control activity. (i) With... aviation critical safety item is to be used; and (ii) With respect to a ship critical safety item, means...-AG92 Defense Federal Acquisition Regulation Supplement; Identification of Critical Safety Items (DFARS...
Data Acquisition System(DAS) Sustaining Engineering
NASA Technical Reports Server (NTRS)
1998-01-01
This paper presents general information describing the Data Acquisition System contract, a summary of objectives, tasks performed and completed. The hardware deliverables which are comprised of: 1) Two ground DAS units; 2) Two flight DAS units; 3) Logistic spares; and 4) Shipping containers are described. Also included are the data requirements and scope of the contract.
1989-09-01
INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION AND TRAINING THE NATIONAL SHIPBUILDING RESEARCH PROGRAM September 1989 NSRP 0310...SEP 1989 2. REPORT TYPE 3. DATES COVERED 00-00-1989 to 00-00-1989 4. TITLE AND SUBTITLE The National Shipbuilding Research Program . 1989 Ship...Production Symposium, Paper No. 3: Producibility in Ship Design 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d
Data availability and data archeology from the former Soviet Union
NASA Technical Reports Server (NTRS)
Sychev, Yuri; Mikhailov, Nickolai N.
1992-01-01
Acquisition of data on the ocean is believed to start in 1872, when the Royal Navy ship 'Challenger' performed oceanographic stations in its round-world voyage (1872-1876). The first oceanographic studies of the World Ocean refer to the 80s second half of the 19th century. During its round-world expedition 'Vityaz' (1886-1889) headed by S.O. Markov, performed hydrological measurements in the Baltic Sea, Atlantic and Pacific Oceans. According to information available the regular expedition observations (prototype of future complex international program on the ocean research) started in the second half of 80s last century under the auspice of Kiev commission for exploration of German Seas. Systematic hydrological observations were organized by Hydrographic Department of Russia in 1876-1879 according to the program similar to the Kiev one and observations were regularly made by ships of custom service over the Russian area of the Baltic Sea. The increasing demands in oceanographic data contributed to considerable progress in exploration of the World Ocean during current century whole tendency to increase and become more significant has been observed for the last 30-40 years. Most probably various expeditions which were carried out during International Geophysical Year in different regions of the World Ocean are to be reference point in performing intensive oceanographic observations of Marine environment. In the former USSR oceanographic observations are made by research and hydrographic vessels, commercial and fishery ships as well as oil production platforms, coastal hydrometeorological station and other observing platforms. Oceanographic observations data, available from main sources of information on the ocean-research vessels, are also considered in the report.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false F.o.b. origin, freight... Transportation in Supply Contracts 847.303-70 F.o.b. origin, freight prepaid, transportation charges to be... shipping cost, if the shipped parcel weighs 70 pounds or less and does not exceed 108 inches in length and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false F.o.b. origin, freight... Transportation in Supply Contracts 847.303-70 F.o.b. origin, freight prepaid, transportation charges to be... shipping cost, if the shipped parcel weighs 70 pounds or less and does not exceed 108 inches in length and...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false F.o.b. origin, freight... Transportation in Supply Contracts 847.303-70 F.o.b. origin, freight prepaid, transportation charges to be... shipping cost, if the shipped parcel weighs 70 pounds or less and does not exceed 108 inches in length and...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false F.o.b. origin, freight... Transportation in Supply Contracts 847.303-70 F.o.b. origin, freight prepaid, transportation charges to be... shipping cost, if the shipped parcel weighs 70 pounds or less and does not exceed 108 inches in length and...
48 CFR 52.247-46 - Shipping Point(s) Used in Evaluation of F.o.b. Origin Offers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Evaluation of F.o.b. Origin Offers. 52.247-46 Section 52.247-46 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.247-46 Shipping Point(s) Used in Evaluation of F.o.b. Origin Offers. As prescribed in 47.305-3(b)(4)(ii), insert the following provision in f.o.b. origin solicitations...
48 CFR 847.303-1 - F.o.b. origin.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false F.o.b. origin. 847.303-1 Section 847.303-1 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 847.303-1 F.o.b. origin. Shipments falling within this category must be shipped on a bill of...
2007-06-12
up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The
2006-07-26
FY2008. Although the Navy’s proposed force of 31 amphibious ships includes 10 LPD-17 class ships, the Navy is planning to end LPD-17 procurement in...expresses concerns about the planned reduction in amphibious ships, the sea basing concept, and the MPF(F) program, and requires a report on sea basing...Ship Force Structure Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Sea Basing Concept of Operations
A Study of Ship Acquisition Cost Estimating in the Naval Sea Systems Command. Appendices
1977-10-01
Shipbuilding Is A Heovy Fabrication Industry Pro- ducing Small Numbers Of Expensive, Complex Units Of Output PAGE A-2 (1) Due to its heavy ...estimate future ship construction costs. - A-l 1. SHIPBUILDING IS A HEAVY FABRICATION INDUSTRY PRODUCING SMALL NUMBERS OF EXPENSIVE, COMPLEX...extensively in production line industries such as automotive products and the airframe industry. (1) Due To Its Heavy Construction Orientation
Naval Ship Procurement Process Study
1978-07-01
was to drdw from the troublesome experiences of the past, compelling lessons which the Navy and the shipbuilding industry would be strongly motivated...These interviews provided a number of insights into the process of planning for the acquisition of Navy ships as well as the legal and business...strategies on recent pro- grams. Prospective shipbuilders have participated in the preparation of the con- tract design package, and it is planned on
Automated generation of weld path trajectories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sizemore, John M.; Hinman-Sweeney, Elaine Marie; Ames, Arlo Leroy
2003-06-01
AUTOmated GENeration of Control Programs for Robotic Welding of Ship Structure (AUTOGEN) is software that automates the planning and compiling of control programs for robotic welding of ship structure. The software works by evaluating computer representations of the ship design and the manufacturing plan. Based on this evaluation, AUTOGEN internally identifies and appropriately characterizes each weld. Then it constructs the robot motions necessary to accomplish the welds and determines for each the correct assignment of process control values. AUTOGEN generates these robot control programs completely without manual intervention or edits except to correct wrong or missing input data. Most shipmore » structure assemblies are unique or at best manufactured only a few times. Accordingly, the high cost inherent in all previous methods of preparing complex control programs has made robot welding of ship structures economically unattractive to the U.S. shipbuilding industry. AUTOGEN eliminates the cost of creating robot control programs. With programming costs eliminated, capitalization of robots to weld ship structures becomes economically viable. Robot welding of ship structures will result in reduced ship costs, uniform product quality, and enhanced worker safety. Sandia National Laboratories and Northrop Grumman Ship Systems worked with the National Shipbuilding Research Program to develop a means of automated path and process generation for robotic welding. This effort resulted in the AUTOGEN program, which has successfully demonstrated automated path generation and robot control. Although the current implementation of AUTOGEN is optimized for welding applications, the path and process planning capability has applicability to a number of industrial applications, including painting, riveting, and adhesive delivery.« less
76 FR 76811 - Stakeholders Meeting Regarding Ready Reserve Force (RRF) Ship Manager Contract Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-08
... for Cost Saving Methods in Program Management, Ship Costs, Green Initiatives. Limited Scope Ship... registration is recommended. The DOT building at 1200 New Jersey Ave. SE. has security entrance requirements...
1990-09-14
transmission of detected variations through sound lines of communication to centrally located standard Navy computers . These computers would be programmed to...have been programmed in C language. The program runs under the operating system ,OS9 on a VME-bus computer with a 68000 microprocessor. A number of full...present practice of"add-on" supervisory controls during ship design and construction,and "fix-it" R&D programs implemented after the ship isoperational
Near Real Time Ship Detection Experiments
NASA Astrophysics Data System (ADS)
Brusch, S.; Lehner, S.; Schwarz, E.; Fritz, T.
2010-04-01
A new Near Real Time (NRT) ship detection processor SAINT (SAR AIS Integrated Toolbox) was developed in the framework of the ESA project MARISS. Data are received at DLRs ground segment DLR-BN (Neustrelitz, Germany). Results of the ship detection are available on ftp server within 30 min after the acquisition started. The detectability of ships on Synthetic Aperture Radar (SAR) ERS-2, ENVISAT ASAR and TerraSAR-X (TS-X) images is validated by coastal (live) AIS and space AIS. The monitoring areas chosen for surveillance are the North-, Baltic Sea, and Cape Town. The detectability in respect to environmental parameters like wind field, sea state, currents and changing coastlines due to tidal effects is investigated. In the South Atlantic a tracking experiment of the German research vessel Polarstern has been performed. Issues of piracy in particular in respect to ships hijacked at the Somali coast are discussed. Some examples using high resolution images from TerraSAR-X are given.
2017-04-01
commercial designs . The Navy planned to experiment with these ships to determine its preferred design variant. This experimentation strategy was...utilizing other non -LCS designs .6 When presented with this conclusion, senior Navy leadership directed the task force to explore what capabilities... compared to the LCS. Since the frigate will be based on an LCS design , it will likely carry forward some LCS design limitations. For example, LCS is
Naval Biodynamics Laboratory 1993 Command History
1993-01-01
position and alignment, camera optical calibration, photo target position, and standard anatomical coordinate systems based upon X-rays of each HRV...safety range. Before, during, and after each sled run, a physiological data acquisition system is used to collect and analyze physiological measurements ...experimental devices. It is also responsible for the configuring of field data measuring and acquisition systems for use aboard ships or at other field
48 CFR 13.403 - Preparation and execution of orders.
Code of Federal Regulations, 2012 CFR
2012-10-01
... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13... the fast payment procedure shall include the following: (a) A requirement that the supplies be shipped...
48 CFR 13.403 - Preparation and execution of orders.
Code of Federal Regulations, 2011 CFR
2011-10-01
... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13... the fast payment procedure shall include the following: (a) A requirement that the supplies be shipped...
48 CFR 13.403 - Preparation and execution of orders.
Code of Federal Regulations, 2014 CFR
2014-10-01
... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13... the fast payment procedure shall include the following: (a) A requirement that the supplies be shipped...
48 CFR 13.403 - Preparation and execution of orders.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13... the fast payment procedure shall include the following: (a) A requirement that the supplies be shipped...
48 CFR 13.403 - Preparation and execution of orders.
Code of Federal Regulations, 2013 CFR
2013-10-01
... REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES Fast Payment Procedure 13... the fast payment procedure shall include the following: (a) A requirement that the supplies be shipped...
Ship Operating and Support Cost Estimating Guide.
1982-07-13
and Support, Cost Estimating Guide." Please substitute it for the document now on file at DTIC with the AD number of A 132442. Geraldine W. Asher I...replaces the CAIG memorandum on Operating and Sup- port Cos y Structures dated August 1977. 1.2 AUTHORITY. The foundation for development and review of...during the acquisition process, including cost effec- tiveness trade-off studies . The guide is generally expressed at the ship level of cost but is
A Study of the Russian Acquisition of the French Mistral Amphibious Assault Warships
2011-06-01
Paris to purchase the Mistral class amphibious assault ship. In December 2010, Russia indicated that it was prepared to move forward with an agreement...some still see as a threat. For this reason, the sale has raised fears among the smaller NATO members, who charge that Paris has brushed aside their...INTENTIONALLY LEFT BLANK v ABSTRACT In 2009, Moscow opened negotiations with Paris to purchase the Mistral class amphibious assault ship. In December
1989-09-01
INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION AND TRAINING THE NATIONAL SHIPBUILDING RESEARCH PROGRAM September 1989 NSRP 0310...SEP 1989 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE The National Shipbuilding Research Program 1989 Ship Production Symposium...Paper No. 3: Producibility in Ship Design 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e
NASA Astrophysics Data System (ADS)
Schwenk, Kurt; Willburger, Katharina; Pless, Sebastian
2017-10-01
Motivated by politics and economy, the monitoring of the world wide ship traffic is a field of high topicality. To detect illegal activities like piracy, illegal fishery, ocean dumping and refugee transportation is of great value. The analysis of satellite images on the ground delivers a great contribution to situation awareness. However, for many applications the up-to-dateness of the data is crucial. With ground based processing, the time between image acquisition and delivery of the data to the end user is in the range of several hours. The highest influence to the duration of ground based processing is the delay caused by the transmission of the large amount of image data from the satellite to the processing centre on the ground. One expensive solution to this issue is the usage of data relay satellites systems like EDRS. Another approach is to analyse the image data directly on-board of the satellite. Since the product data (e.g. ship position, heading, velocity, characteristics) is very small compared to the input image data, real-time connections provided by satellite telecommunication services like Iridium or Orbcomm can be used to send small packets of information directly to the end user without significant delay. The AMARO (Autonomous real-time detection of moving maritime objects) project at DLR is a feasibility study of an on-board ship detection system involving a real-time low bandwidth communication. The operation of a prototype on-board ship detection system will be demonstrated on an airborne platform. In this article, the scope, aim and design of a flight experiment for an on-board ship detection system scheduled for mid of 2018 is presented. First, the scope and the constraints of the experiment are explained in detail. The main goal is to demonstrate the operability of an automatic ship detection system on board of an airplane. For data acquisition the optical high resolution DLR MACS-MARE camera (VIS/NIR) is used. The system will be able to send product data, like position, size and a small image of the ship directly to the user's smart-phone by email. The time between the acquisition of the image data and the delivery of the product data to the end-user is aimed to be less than three minutes. For communication, the SMS-like Iridium Short Burst Data (SBD) Service was chosen, providing a message size of around 300 Bytes. Under optimal sending/receiving conditions, messages can be transmitted bidirectional every 20 seconds. Due to the very small data bandwidth, not all product data may be transmittable at once, for instance, when flying over busy ships traffic zones. Therefore the system offers two services: a query and a push service. With the query service the end user can explicitly request data of a defined location and fixed time period by posting queries in an SQL-like language. With the push service, events can be predefined and messages are received automatically, if and when the event occurs. Finally, the hardware set-up, details of the ship detection algorithms and the current status of the experiment is presented.
GPHS-RTGs in support of the Cassini mission
NASA Astrophysics Data System (ADS)
1992-04-01
The technical progress achieved during the period 30 Mar. - 27 Sep. 1992 is described. Topics covered include: spacecraft integration and liaison; engineering support; safety; qualified unicouple production, ETG fabrication, assembly, and test; ground support equipment; radioisotope thermoelectric generators (RTG) shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, reliability, contract changes, non-capital contractor acquired government owned (CAGO) acquisitions, and CAGO maintenance; and CAGO acquisitions.
ERIC Educational Resources Information Center
Department of the Navy, Washington, DC.
This lesson contains materials for the U.S. Navy Museum's "Ships to the Sea" program. The program is appropriate for students in grades 2-4 and was designed in accordance with local and national social studies standards. The materials introduce students to the world of ship technology and naval terminology. The lesson is presented in…
A Proposal for an Australian Hydrodynamics Laboratory.
1981-05-01
SPAIN Cau~al De CDRV C 0.9x0.9 4.7 11.0 1.6 225 yes Experiencias ijidrodinainica Madrid SWEDEN Swedish State C,R,V C 0.5x0.5 2.2 11 2 atm 53 yes...results of research on topics related to ship design. Currently, detailed design informa- tion on ship hydrodynamics available to Naval Architects in... relating to the introduction, continuous up- dating, and improvement of instrumentation and data acquisition and processing systems. 2. The evaluation and
Acquisition and Competition Strategy Options for the DD(X): The U.S. Navy’s 21st Century Destroyer
2006-01-01
5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Rand Corporation,National Defense Research Institute,1776...In April 2002, one of those teams, led by Nor- throp Grumman Ship Systems ( NGSS ), was selected winner of the competition and awarded a $2.9 billion...Northrop Grumman Ship Systems ( NGSS ) and including Raytheon Systems Co. was selected as winner of that competition and placed under contract to
Cost Estimation of Naval Ship Acquisition.
1983-12-01
one a 9-sub- system model , the other a single total cost model . The models were developed using the linear least squares regression tech- nique with...to Linear Statistical Models , McGraw-Hill, 1961. 11. Helmer, F. T., Bibliography on Pricing Methodology and Cost Estimating, Dept. of Economics and...SUPPI.EMSaTARY NOTES IS. KWRo" (Cowaft. en tever aide of ..aesep M’ Idab~t 6 Week ONNa.) Cost estimation; Acquisition; Parametric cost estimate; linear
Using the time shift in single pushbroom datatakes to detect ships and their heading
NASA Astrophysics Data System (ADS)
Willburger, Katharina A. M.; Schwenk, Kurt
2017-10-01
The detection of ships from remote sensing data has become an essential task for maritime security. The variety of application scenarios includes piracy, illegal fishery, ocean dumping and ships carrying refugees. While techniques using data from SAR sensors for ship detection are widely common, there is only few literature discussing algorithms based on imagery of optical camera systems. A ship detection algorithm for optical pushbroom data has been developed. It takes advantage of the special detector assembly of most of those scanners, which allows apart from the detection of a ship also the calculation of its heading out of a single acquisition. The proposed algorithm for the detection of moving ships was developed with RapidEye imagery. It algorithm consists mainly of three steps: the creation of a land-watermask, the object extraction and the deeper examination of each single object. The latter step is built up by several spectral and geometric filters, making heavy use of the inter-channel displacement typical for pushbroom sensors with multiple CCD lines, finally yielding a set of ships and their direction of movement. The working principle of time-shifted pushbroom sensors and the developed algorithm is explained in detail. Furthermore, we present our first results and give an outlook to future improvements.
Mother ship and physical agents collaboration
NASA Astrophysics Data System (ADS)
Young, Stuart H.; Budulas, Peter P.; Emmerman, Philip J.
1999-07-01
This paper discusses ongoing research at the U.S. Army Research Laboratory that investigates the feasibility of developing a collaboration architecture between small physical agents and a mother ship. This incudes the distribution of planning, perception, mobility, processing and communications requirements between the mother ship and the agents. Small physical agents of the future will be virtually everywhere on the battlefield of the 21st century. A mother ship that is coupled to a team of small collaborating physical agents (conducting tasks such as Reconnaissance, Surveillance, and Target Acquisition (RSTA); logistics; sentry; and communications relay) will be used to build a completely effective and mission capable intelligent system. The mother ship must have long-range mobility to deploy the small, highly maneuverable agents that will operate in urban environments and more localized areas, and act as a logistics base for the smaller agents. The mother ship also establishes a robust communications network between the agents and is the primary information disseminating and receiving point to the external world. Because of its global knowledge and processing power, the mother ship does the high-level control and planning for the collaborative physical agents. This high level control and interaction between the mother ship and its agents (including inter agent collaboration) will be software agent architecture based. The mother ship incorporates multi-resolution battlefield visualization and analysis technology, which aids in mission planning and sensor fusion.
Overview of GNSS-R Research Program for Ocean Observations at Japan
NASA Astrophysics Data System (ADS)
Ichikawa, Kaoru; Ebinuma, Takuji; Akiyama, Hiroaki; Kitazawa, Yukihito
2015-04-01
GNSS-R is a new remote-sensing method which uses reflected GNSS signals. Since no transmitters are required, it is suitable for small satellites. Constellations of GNSS-R small satellites have abilities on revolutionary progress on 'all-time observable' remote-sensing methods . We have started a research program for GNSS-R applications on oceanographic observations under a contract with MEXT (Ministry of Education Culture, Sports, Science and Technology, JAPAN) as a'Space science research base formation program'. The duration of research program is 3 years (2015-2017). The one of important focuses of this program is creation of a new community to merge space engineering and marine science through establishment on application plans of GNSS-R. Actual GNSS-R data acquisition experiments using multi-copters, ships, and/or towers are planned, together with in-situ sea truth data such as wave spectrum, wind speed profiles and sea surface height. These data are compared to determine the accuracy and resolution of the estimates based on GNSS-R observations. Meanwhile, preparation of a ground station for receiving GNSS-R satellite data will be also established. Whole those data obtained in this project will be distributed for public. This paper introduces the overview of research plan..
46 CFR 16.401 - Employee Assistance Program (EAP).
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Employee Assistance Program (EAP). 16.401 Section 16.401 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN CHEMICAL TESTING Employee Assistance Programs § 16.401 Employee Assistance Program (EAP). The employer shall provide an...
Brocher, Thomas M.; Pratt, Thomas L.; Miller, Kate C.; Tréhu, Anne M.; Snelson, Catherine M.; Weaver, Craig S.; Creager, Ken C.; Crosson, Robert S.; ten Brink, Uri S.; Alvarez, Marcos G.; Harder, Steven H.; Asudeh, Isa
2000-01-01
This report describes the acquisition, processing, and quality of seismic reflection and refraction data obtained in the Seattle basin, central Puget Lowland, western Washington, in September 1999 during the Seismic Hazards Investigation of Puget Sound (SHIPS). As a sequel to the 1998 SHIPS air gun experiment (also known as 'Wet SHIPS'), the 1999 experiment, nicknamed 'Dry SHIPS,' acquired a 112-km-long east-west trending multichannel seismic reflection and refraction line in the Seattle basin. One thousand and eight seismographs were deployed at a nominal spacing of 100 meters, and 29 shot points were detonated at approximately 4 km intervals along the seismic line. The wide-angle seismic profile was designed to (1) determine the E-W geometry of Seattle basin, (2) measure the seismic velocities within the basin, and (3) define the basement structure underlying the Seattle basin. In this report, we describe the acquisition of these data, discuss the processing and merging of the data into common shot gathers, and illustrate the acquired profiles. We also describe the format and content of the archival tapes containing the SEGY-formatted, common-shot gathers. Data quality is variable, but useful data were acquired from all 29 shot points fired along the Dry SHIPS seismic line. The data show pronounced travel time delays associated with the low velocity sedimentary rocks filling the Seattle basin. Thirty-five REFTEK stations, deployed at 4 km intervals along the Dry SHIPS line, recorded 26 regional earthquakes and blasts and 17 teleseismic events, including the main shock and several aftershocks of the Mw=7.6 Chi-Chi (Taiwan) earthquake of 9/20/1999. The teleseismic recordings of the Chi-Chi (Taiwan) mainshock provide useful signals down to 10 second periods. They document a significant (factor between 5 and 10) focusing of compressional- and shear-wave energy by the Seattle basin at periods between 1 and 2 seconds relative to 'bedrock' sites east and west of the basin. Signal durations in the Seattle basin were also substantially increased relative to 'bedrock' sites in the Olympic peninsula and Cascade foothills.
Ferson, Mark J; Ressler, Kelly-Anne
2005-04-18
A program for routine health surveillance on international cruise ships visiting the Port of Sydney has been developed since 1998. Before introduction of this program, ships only reported quarantinable diseases and were not aware of the Australian requirement to report other infectious diseases. Voluntary routine reporting, developed in partnership with the cruise ship industry, provides timely information on all infectious diseases of public health interest during every cruise. During 1999-2003, the program resulted in detection of and response to 14 outbreaks of gastroenteritis or acute respiratory infection, affecting more than 1400 passengers and crew. The program has improved preventive action, and risk communication and management by cruise ship operators, and led to more timely investigation and support by public health authorities.
2012-12-01
potential offeror in response to its request must not be disclosed if doing so would reveal the potential offeror’s confidential business strategy...also the Navy Academy and the Navy hospital have and operate kitchen facilities. Ships have their own kitchen facilities too and dedicated personnel...abandoned. Now the HN dedicates personnel, has kitchen facilities to provide the food services and doing the whole process. The HN could outsource
Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress
2015-12-22
the ships. The Navy continues to review manning to determine appropriate levels, and is adding 20 berths to all seaframes. The increased berthing ...ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the FY2010 ships and the other team getting one
Constellation analysis of an integrated AIS/remote sensing spaceborne system for ship detection
NASA Astrophysics Data System (ADS)
Graziano, Maria Daniela; D'Errico, Marco; Razzano, Elena
2012-08-01
A future system integrating data from remote sensing and upcoming AIS satellites is analyzed through the development of a novel design method for global, discontinuous coverage constellations. It is shown that 8 AIS satellites suffice to guarantee global coverage and a ship location update of 50 min if the spaceborne AIS receiver has a swath of 2800 nm. Furthermore, synergic utilization of COSMO/SkyMed and Radarsat-C data would provide a mean revisit time of 7 h, with AIS information available within 25 min from SAR data acquisition.
Diarrheal disease on cruise ships, 1990-2000: the impact of environmental health programs.
Cramer, Elaine H; Gu, David X; Durbin, Randy E
2003-04-01
In 1975, the then-Center for Disease Control (CDC) established the Vessel Sanitation Program (VSP) to minimize the risk for diarrheal disease among passengers and crew aboard ships by assisting the cruise ship industry in developing and implementing comprehensive environmental health programs. To evaluate the relationship between cruise ship sanitation scores and diarrheal disease incidence and outbreaks among cruise ship passengers. Retrospective cohort study of ship inspection and diarrheal disease data from 1990 through 2000 from the National Center for Environmental Health, CDC database, for cruise ships entering the United States. Yearly trends in number of ships inspected, number of inspections conducted, inspection scores, and risks of failing inspections; rates of diarrheal disease among passengers, by inspection year, cruise duration, incidence of outbreaks, and passing- or failing-score status of the associated ship. From 1990 through 2000, inspection scores gradually increased from a median of 89 in 1990 to 93 in 2000 (p<0.001), with an associated statistically significant 21% increase in likelihood of passing. The total baseline level of diarrhea among passengers was 2.0 cases per cruise (13243/6485), or 23.6 cases per 100,000 passenger-days (13243/56129096). The latter rate declined significantly from 29.2 in 1990 to 16.3 in 2000 (p<0.0001). Diarrheal disease incidence rates among passengers sailing on ships that passed environmental inspections were significantly lower than rates among passengers sailing on ships that failed inspections (21.7 vs 30.1; RR = 1.39; 95% CI: 1.31-1.47). Diarrheal disease outbreak-related illnesses decreased from 4.2 to 3.5 per 100000 passenger-days from 1990-1995 to 1996-2000. Environmental sanitation inspections conducted among ships sailing into the United States appear to continue to decrease diarrheal disease rates and outbreaks among passengers.
Structural health monitoring for ship structures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farrar, Charles; Park, Gyuhae; Angel, Marian
2009-01-01
Currently the Office of Naval Research is supporting the development of structural health monitoring (SHM) technology for U.S. Navy ship structures. This application is particularly challenging because of the physical size of these structures, the widely varying and often extreme operational and environmental conditions associated with these ships missions, lack of data from known damage conditions, limited sensing that was not designed specifically for SHM, and the management of the vast amounts of data that can be collected during a mission. This paper will first define a statistical pattern recognition paradigm for SHM by describing the four steps of (1)more » Operational Evaluation, (2) Data Acquisition, (3) Feature Extraction, and (4) Statistical Classification of Features as they apply to ship structures. Note that inherent in the last three steps of this process are additional tasks of data cleansing, compression, normalization and fusion. The presentation will discuss ship structure SHM challenges in the context of applying various SHM approaches to sea trials data measured on an aluminum multi-hull high-speed ship, the HSV-2 Swift. To conclude, the paper will discuss several outstanding issues that need to be addressed before SHM can make the transition from a research topic to actual field applications on ship structures and suggest approaches for addressing these issues.« less
Application of NASTRAN to propeller-induced ship vibration
NASA Technical Reports Server (NTRS)
Liepins, A. A.; Conaway, J. H.
1975-01-01
An application of the NASTRAN program to the analysis of propeller-induced ship vibration is presented. The essentials of the model, the computational procedure, and experience are described. Desirable program enhancements are suggested.
USN shipboard infrared search and track (IRST) program
NASA Astrophysics Data System (ADS)
Misanin, Joseph E.
1997-08-01
On May 17, 1987 two EXOCET missiles hit and crippled the frigate USS STARK. Thirty seven sailors lost their lives due to the inability of the ship to defend itself against a sea- skimming cruise missile attack. In 1991, as a result of this incident, Congress mandated the establishment of a Program Executive Office for Ship Self Defense. The purpose of the legislation was to preclude another incident by placing a high priority on the combat system engineering process used to design and field the anti-ship cruise missile (ASCM) defense capability of surface ships. Over 35 countries now have sea- skimming ASCMs and this type of threat continues to proliferate. The use of IRST is a critical element of ship self defense, providing early and reliable detection of sea- skimming cruise missiles. This paper describes the contribution of IRST in providing self-defense and the current status of the United States Navy (USN) shipboard IRST development program.
46 CFR 197.545 - Program to reduce personal exposure.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Program to reduce personal exposure. 197.545 Section 197.545 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Benzene § 197.545 Program to reduce personal exposure. (a) When...
46 CFR 197.545 - Program to reduce personal exposure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Program to reduce personal exposure. 197.545 Section 197.545 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Benzene § 197.545 Program to reduce personal exposure. (a) When...
46 CFR 197.545 - Program to reduce personal exposure.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Program to reduce personal exposure. 197.545 Section 197.545 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Benzene § 197.545 Program to reduce personal exposure. (a) When...
46 CFR 197.545 - Program to reduce personal exposure.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Program to reduce personal exposure. 197.545 Section 197.545 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Benzene § 197.545 Program to reduce personal exposure. (a) When...
46 CFR 197.545 - Program to reduce personal exposure.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Program to reduce personal exposure. 197.545 Section 197.545 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND HEALTH STANDARDS GENERAL PROVISIONS Benzene § 197.545 Program to reduce personal exposure. (a) When...
The computer coordination method and research of inland river traffic based on ship database
NASA Astrophysics Data System (ADS)
Liu, Shanshan; Li, Gen
2018-04-01
A computer coordinated management method for inland river ship traffic is proposed in this paper, Get the inland ship's position, speed and other navigation information by VTS, building ship's statics and dynamic data bases, writing a program of computer coordinated management of inland river traffic by VB software, Automatic simulation and calculation of the meeting states of ships, Providing ship's long-distance collision avoidance information. The long-distance collision avoidance of ships will be realized. The results show that, Ships avoid or reduce meetings, this method can effectively control the macro collision avoidance of ships.
Report #17-P-0029, November 7, 2016. Ineffective project oversight could cause project delays that prolong the EPA's ability to provide emergency responders with data about hazardous waste shipped between generators’ sites and waste management facilities.
48 CFR 52.247-53 - Freight Classification Description.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Freight Classification....247-53 Freight Classification Description. As prescribed in 47.305-9(b)(1), insert the following... modifications of previously shipped items, and different freight classifications may apply: Freight...
48 CFR 52.247-53 - Freight Classification Description.
Code of Federal Regulations, 2014 CFR
2014-10-01
... modifications of previously shipped items, and different freight classifications may apply: Freight... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Freight Classification....247-53 Freight Classification Description. As prescribed in 47.305-9(b)(1), insert the following...
48 CFR 52.247-53 - Freight Classification Description.
Code of Federal Regulations, 2013 CFR
2013-10-01
... modifications of previously shipped items, and different freight classifications may apply: Freight... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Freight Classification....247-53 Freight Classification Description. As prescribed in 47.305-9(b)(1), insert the following...
48 CFR 52.247-53 - Freight Classification Description.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Freight Classification....247-53 Freight Classification Description. As prescribed in 47.305-9(b)(1), insert the following... modifications of previously shipped items, and different freight classifications may apply: Freight...
48 CFR 52.247-53 - Freight Classification Description.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Freight Classification....247-53 Freight Classification Description. As prescribed in 47.305-9(b)(1), insert the following... modifications of previously shipped items, and different freight classifications may apply: Freight...
Cramer, Elaine H; Blanton, Curtis J; Otto, Charles
2008-03-01
In the course of a successful collaboration between the Centers for Disease Control and Prevention (CDC) and the cruise ship industry on reducing common-source outbreaks, CDC's Vessel Sanitation Program (VSP) has expanded its training, education, and cruise ship inspection programs. The study reported here evaluated 15 years of ship sanitation inspection data from the National Center for Environmental Health and assessed performance in specific sanitation categories from 1996 to 2005. During the period 1990-2005, scores from cruise ship environmental sanitation inspections steadily improved. The percentage of inspections with violations decreased among five of nine categories. Those five categories were Washing Facilities, Contact Surfaces, Facility Maintenance, Food Handling, and Communicable Disease Practices. Inspection violations increased proportionally in the categories of Swimming Pools and Water System Protection/Chart Recording. Overall continued good performance in most sanitation categories is likely attributable to on-site training during inspections, improvements in ship construction, and a switch from hot-holding temperatures to time limits as a public health control for foods on display.
Integrated crystal mounting and alignment system for high-throughput biological crystallography
Nordmeyer, Robert A.; Snell, Gyorgy P.; Cornell, Earl W.; Kolbe, William F.; Yegian, Derek T.; Earnest, Thomas N.; Jaklevich, Joseph M.; Cork, Carl W.; Santarsiero, Bernard D.; Stevens, Raymond C.
2007-09-25
A method and apparatus for the transportation, remote and unattended mounting, and visual alignment and monitoring of protein crystals for synchrotron generated x-ray diffraction analysis. The protein samples are maintained at liquid nitrogen temperatures at all times: during shipment, before mounting, mounting, alignment, data acquisition and following removal. The samples must additionally be stably aligned to within a few microns at a point in space. The ability to accurately perform these tasks remotely and automatically leads to a significant increase in sample throughput and reliability for high-volume protein characterization efforts. Since the protein samples are placed in a shipping-compatible layered stack of sample cassettes each holding many samples, a large number of samples can be shipped in a single cryogenic shipping container.
Integrated crystal mounting and alignment system for high-throughput biological crystallography
Nordmeyer, Robert A.; Snell, Gyorgy P.; Cornell, Earl W.; Kolbe, William; Yegian, Derek; Earnest, Thomas N.; Jaklevic, Joseph M.; Cork, Carl W.; Santarsiero, Bernard D.; Stevens, Raymond C.
2005-07-19
A method and apparatus for the transportation, remote and unattended mounting, and visual alignment and monitoring of protein crystals for synchrotron generated x-ray diffraction analysis. The protein samples are maintained at liquid nitrogen temperatures at all times: during shipment, before mounting, mounting, alignment, data acquisition and following removal. The samples must additionally be stably aligned to within a few microns at a point in space. The ability to accurately perform these tasks remotely and automatically leads to a significant increase in sample throughput and reliability for high-volume protein characterization efforts. Since the protein samples are placed in a shipping-compatible layered stack of sample cassettes each holding many samples, a large number of samples can be shipped in a single cryogenic shipping container.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-18
... Cotton Program Changes for Upland Cotton, Adjusted World Price, and Active Shipping Orders AGENCY... previous final rule that implemented the 2008 Farm Bill provisions for the cotton program. The correction removes definitions that are no longer used concerning Northern Europe prices for cotton. CCC is also...
Navy Littoral Combat Ship (LCS) Program: Oversight Issues and Options for Congress
2007-06-11
Summary The Littoral Combat Ship (LCS) is a small, fast ship that uses modular “plug- and-fight” mission packages, including unmanned vehicles (UVs). The...small, fast ship that uses modular “plug-and- fight” mission packages, including unmanned vehicles (UVs). The basic version of the LCS, without any...including unmanned vehicles (UVs). Rather than being a multimission ship like the Navy’s current large surface combatants, the LCS is a focused-mission ship
48 CFR 47.305-9 - Commodity description and freight classification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of previously shipped items, and different freight classifications may apply, the contracting officer... freight classification. 47.305-9 Section 47.305-9 Federal Acquisition Regulations System FEDERAL... Commodity description and freight classification. (a) Generally, the freight rate for supplies is based on...
48 CFR 47.305-9 - Commodity description and freight classification.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of previously shipped items, and different freight classifications may apply, the contracting officer... freight classification. 47.305-9 Section 47.305-9 Federal Acquisition Regulations System FEDERAL... Commodity description and freight classification. (a) Generally, the freight rate for supplies is based on...
48 CFR 47.305-9 - Commodity description and freight classification.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of previously shipped items, and different freight classifications may apply, the contracting officer... freight classification. 47.305-9 Section 47.305-9 Federal Acquisition Regulations System FEDERAL... Commodity description and freight classification. (a) Generally, the freight rate for supplies is based on...
48 CFR 47.305-9 - Commodity description and freight classification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of previously shipped items, and different freight classifications may apply, the contracting officer... freight classification. 47.305-9 Section 47.305-9 Federal Acquisition Regulations System FEDERAL... Commodity description and freight classification. (a) Generally, the freight rate for supplies is based on...
From Deck Hand to Program Manager - 30 years with Research Vessels
NASA Astrophysics Data System (ADS)
Prince, J. M.
2012-12-01
Starting in 1980 as a Mate and Deck Hand and working my way up to Captain, Marine Superintendent, UNOLS Executive Secretary and now as an ONR Research Facilities Program Manager focused on the acquisition of two new Ocean Class Research Vessels, I have witnessed first hand the evolution of the U.S. Academic Research Fleet. The author will focus on a few key events in the evolution of the modern research fleet. As a deck hand, mate and Captain, I was involved in an early multi-disciplinary effort often using two ships working together to conduct sampling and analysis in Physical, Chemical and Biological oceanography. The VERTEX cruises led by John Martin and others used the R/V CAYUSE and R/V WECOMA extensively through out the NE Pacific Ocean conducting research that led to Dr. Martin's Iron Hypothesis. This work and that of others involving trace metal clean sampling and clean laboratories on board our ships pushed many new and demanding requirements for future vessels. As a ship scheduler and as chair of the Research Vessel Operators Committee (RVOC) I saw the increasing use of Remotely Operated Vehicles to complement the work being done with the ALVIN and other occupied submersibles. This led to scheduling challenges and changes to our safety standards, but also to many new opportunities for discoveries on the many mid-ocean ridges and hydro-thermal vent fields. More recently, Autonomous Underwater Vehicles (AUV) and Unmanned Aerial Vehicles (UAV) and aircraft have been used simultaneously with research vessels such as during a multi-PI, multi-ship program in the Monterey Bay. Communications at sea have changed dramatically in the past thirty years. No longer are we limited to reading the data from a spreadsheet over a Single Side Band radio so that the PI ashore can track the progress of a cruise and provide guidance for the next day's sampling. Full bandwidth communications are becoming the norm with the capability of streaming video from an ROV to shore or to exchange data for real-time modeling updates. These new technologies and the multi-disciplinary nature of ocean science research projects have led to many improvements to our Science Mission Requirements for new research vessels. In the next three to four years, three new research vessels will come on line followed by the possibility of three additional Regional Class research vessels. All of these new vessels will come with improved capabilities to support research projects of the future.
Since the damping coefficients play a predominant role in the motion response of ships in pitch and heave at resonant frequencies in a seaway, use...was made of two computer programs recently developed at M. I. T. to calculate, by thin ship theory, the effect of ship speed on the damping coefficients...in pitch and heave for four diverse types of ship hulls--cargo ship, tanker, destroyer, and trawler. Results indicate that, for all four hull types
CVN 78 Gerald R. Ford Class Nuclear Aircraft Carrier (CVN 78)
2013-12-01
Capabil... -Follow-on Ship (CVN 79) DAB Program Review - • Start Construction - • Delivery .-:K IOT &E IOT &E Start .-:41 IOT &E Complete e(41 Follow-on...Ship (CVN 80) DAB Program Review -Platform-Level Integration D ... ....., Milestone C .. EMALS EMALS Delivery (with Ship) .-:o; IOC ..:<! IOT ...E IOT &E Start ..:<! IOT &E Complete -· Platform-Level Integration .. ...:<! CVN 78 Milestones SAR Baseline Dev Est Current APB Development
Severity of killer whale behavioral responses to ship noise: a dose-response study.
Williams, Rob; Erbe, Christine; Ashe, Erin; Beerman, Amber; Smith, Jodi
2014-02-15
Critical habitats of at-risk populations of northeast Pacific "resident" killer whales can be heavily trafficked by large ships, with transits occurring on average once every hour in busy shipping lanes. We modeled behavioral responses of killer whales to ship transits during 35 "natural experiments" as a dose-response function of estimated received noise levels in both broadband and audiogram-weighted terms. Interpreting effects is contingent on a subjective and seemingly arbitrary decision about severity threshold indicating a response. Subtle responses were observed around broadband received levels of 130 dB re 1 μPa (rms); more severe responses are hypothesized to occur at received levels beyond 150 dB re 1 μPa, where our study lacked data. Avoidance responses are expected to carry minor energetic costs in terms of increased energy expenditure, but future research must assess the potential for reduced prey acquisition, and potential population consequences, under these noise levels. Copyright © 2013 Elsevier Ltd. All rights reserved.
SAR-based sea traffic monitoring: a reliable approach for maritime surveillance
NASA Astrophysics Data System (ADS)
Renga, Alfredo; Graziano, Maria D.; D'Errico, M.; Moccia, A.; Cecchini, A.
2011-11-01
Maritime surveillance problems are drawing the attention of multiple institutional actors. National and international security agencies are interested in matters like maritime traffic security, maritime pollution control, monitoring migration flows and detection of illegal fishing activities. Satellite imaging is a good way to identify ships but, characterized by large swaths, it is likely that the imaged scenes contain a large number of ships, with the vast majority, hopefully, performing legal activities. Therefore, the imaging system needs a supporting system which identifies legal ships and limits the number of potential alarms to be further monitored by patrol boats or aircrafts. In this framework, spaceborne Synthetic Aperture Radar (SAR) sensors, terrestrial AIS and the ongoing satellite AIS systems can represent a great potential synergy for maritime security. Starting from this idea the paper develops different designs for an AIS constellation able to reduce the time lag between SAR image and AIS data acquisition. An analysis of SAR-based ship detection algorithms is also reported and candidate algorithms identified.
EXCHANGE NETWORK FOR EXPANDED POLYSTYRENE BIO-SHIPPING CONTAINERS
Creating an exchange network for shipping containers will provide cost savings, reduce waste, and promote sustainability within the biotechnology industry. Success of this program can divert thousands of EPS containers from landfills each year. A successful pilot program wi...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strunk, W.D.
1987-01-01
Personnel at the Oak Ridge National Laboratory were tasked by the US Navy to assist in establishing a maintenance monitoring program for machinery aboard surface ships. Given the number of surface ships, the variety of locations in which they operate, the different types of equipment (rotating and reciprocating, as well as instrumentation), and the different procedures which control the operation and maintenance of a ship, it can be seen, apart from the logistics of organizing such a monitoring program, that the technical issues are as varied and numerous as the ships themselves. Unique methods and procedures have been developed tomore » perform the tasks required on a large scale. Among the specific tasks and technical issues addressed were the development and installation of a data collection and communication instrumentation system for each port, the qualification of measurement methodologies and techniques, the establishment of computer data bases, the evaluation of the instrumentation used, training of civilian and military personnel, development of machinery condition assessment aids using machine design and modal analysis information, and development of computer displays. After these tasks were completed and the appropriate resolution integrated into the program, the final task was the development of a method to continually evaluate the effectiveness of the program, using actual maintenance records.« less
2005-05-31
building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships
48 CFR 47.303-17 - Contractor-prepaid commercial bills of lading, small package shipments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply... advantageous to the Government, the contracting officer may authorize the contractor to ship supplies, which... subsection, do not require a contract modification. Unless otherwise provided in the contract, the supplies...
Satellite Ocean Color Validation Using Merchant Ships. Chapter 10
NASA Technical Reports Server (NTRS)
Frouin, Robert; Cutchin, David L.; Deschamps, Pierre-Yves
2001-01-01
A collaborative measurement program for evaluating satellite-derived ocean color has been developed based on ships of opportunity (merchant, oceanographic) and specific instrumentation, the SIMBAD radiometer. The purpose of the measurement program is to complement, in a cost-effective way, dedicated evaluation experiments at sea, which are expensive, cannot be carried out over the full range of expected oceanic and atmospheric conditions, and generally provide a few match-ups. Ships participate in the program on a volunteer basis or at a very small cost, and measurement procedures do not interfere with other ship activities. The SIMBAD radiometer is a portable, easy-to-operate instrument that measures the basic ocean color variables, namely aerosol optical thickness and water-leaving radiance, in typical spectral bands of ocean-color sensors, i.e., 443, 490, 560, 670, and 870 nm. Measuring these variables at the time of satellite overpass is usually sufficient to verify satellite-derived ocean color and to evaluate atmospheric correction algorithms. Any ordinary crew can learn quickly how to make measurements. Importantly, the ship is not required to stop, making it possible to collect data along regular routes traveled by merchant ships in the world's oceans.
Navy Littoral Combat Ship (LCS)/Frigate Program: Background and Issues for Congress
2016-01-05
and is adding 20 berths to all seaframes. The increased berthing supports small increases in the size of the core crew, mission package detachments...for both the FY2009 ships and the FY2010 ships would determine the allocation of the three FY2010 ships, with the winning team getting two of the
48 CFR 212.7102 - Pilot program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program. 212.7102... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Acquisition of Military-Purpose Nondevelopmental Items 212.7102 Pilot program. ...
46 CFR 385.35 - Program opportunity notices.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Program opportunity notices. 385.35 Section 385.35 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION MISCELLANEOUS RESEARCH AND DEVELOPMENT GRANT... Business Daily; other MarAd offices; and individuals and organizations who request copies on a one-time...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Definitions. 393.2 Section 393.2 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS UNDER PUBLIC LAW 91-469 AMERICA'S MARINE HIGHWAY PROGRAM... America's Marine Highway Program. (b) Applicant. An entity that applies for designation of a Marine...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Definitions. 393.2 Section 393.2 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS UNDER PUBLIC LAW 91-469 AMERICA'S MARINE HIGHWAY PROGRAM... America's Marine Highway Program. (b) Applicant. An entity that applies for designation of a Marine...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Definitions. 393.2 Section 393.2 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS UNDER PUBLIC LAW 91-469 AMERICA'S MARINE HIGHWAY PROGRAM... America's Marine Highway Program. (b) Applicant. An entity that applies for designation of a Marine...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Definitions. 393.2 Section 393.2 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS UNDER PUBLIC LAW 91-469 AMERICA'S MARINE HIGHWAY PROGRAM... America's Marine Highway Program. (b) Applicant. An entity that applies for designation of a Marine...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mok, G.C.; Thomas, G.R.; Gerhard, M.A.
SCANS (Shipping Cask ANalysis System) is a microcomputer-based system of computer programs and databases developed at the Lawrence Livermore National Laboratory (LLNL) for evaluating safety analysis reports on spent fuel shipping casks. SCANS is an easy-to-use system that calculates the global response to impact loads, pressure loads and thermal conditions, providing reviewers with an independent check on analyses submitted by licensees. SCANS is based on microcomputers compatible with the IBM-PC family of computers. The system is composed of a series of menus, input programs, cask analysis programs, and output display programs. All data is entered through fill-in-the-blank input screens thatmore » contain descriptive data requests. Analysis options are based on regulatory cases described in the Code of Federal Regulations 10 CFR 71 and Regulatory Guides published by the US Nuclear Regulatory Commission in 1977 and 1978.« less
77 FR 6094 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
... Acquisition Regulation Supplement (DFARS) part 245, Government Property; DD Form 1149, Requisition and Invoice/Shipping Document; DD Form 1348-1A, DoD Single Line item Release/Receipt Document; DD Form 1637, Notice of Acceptance of Inventory Schedules; DD Form 1639, Scrap Warranty; DD Form 1640, Request for Plant Clearance...
48 CFR 252.217-7010 - Performance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Performance. 252.217-7010... Clauses 252.217-7010 Performance. As prescribed in 217.7104(a), use the following clause: Performance (JUL..., scrap or other ship's material of the Government resulting from performance of the work as items of...
48 CFR 252.217-7010 - Performance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Performance. 252.217-7010... Clauses 252.217-7010 Performance. As prescribed in 217.7104(a), use the following clause: Performance (JUL..., scrap or other ship's material of the Government resulting from performance of the work as items of...
48 CFR 252.217-7010 - Performance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Performance. 252.217-7010... Clauses 252.217-7010 Performance. As prescribed in 217.7104(a), use the following clause: Performance (JUL..., scrap or other ship's material of the Government resulting from performance of the work as items of...
48 CFR 252.217-7010 - Performance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Performance. 252.217-7010... Clauses 252.217-7010 Performance. As prescribed in 217.7104(a), use the following clause: Performance (JUL..., scrap or other ship's material of the Government resulting from performance of the work as items of...
48 CFR 252.217-7010 - Performance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Performance. 252.217-7010... Clauses 252.217-7010 Performance. As prescribed in 217.7104(a), use the following clause: Performance (JUL..., scrap or other ship's material of the Government resulting from performance of the work as items of...
2009-06-12
these past efforts, DOD recognized the incredible potential that medium and high altitude UAS held for all uniformed services. A pilotless aircraft...from aircraft, ships, missiles, automobiles and related military support equipment. 30 RDT&E: Research, Development, Test and Evaluation pay for
1979-09-01
Proceedings of the REAPS Technical Symposium Paper No. 20: Application of the GIFTS -5 Minibased Graphics System for Ship Design and Analysis U.S...The National Shipbuilding Research Program Proceedings of the REAPS Technical Symposium Paper No. 20: Application of the GIFTS -5 Minibased Graphics...MERCHANTABILITY AND/OR FITNESS FOR PURPOSE ARE SPECIFICALLY DISCLAIMED. APPLICATION OF THE GIFTS -5 MINIBASED GRAPHICS SYSTEM FOR SHIP DESIGN AND ANALYSIS Dr
NASA Technical Reports Server (NTRS)
1981-01-01
The National Science Foundation (NSF) initialized a new phase of exploration last year, a 10 year effort jointly funded by NSF and several major oil companies, known as the Ocean Margin Drilling Program (OMDP). The OMDP requires a ship with capabilities beyond existing drill ships; it must drill in 13,000 feet of water to a depth 20,000 feet below the ocean floor. To meet requirements, NSF is considering the conversion of the government-owned mining ship Glomar Explorer to a deep ocean drilling and coring vessel. Feasibility study performed by Donhaiser Marine, Inc. analyzed the ship's characteristics for suitability and evaluated conversion requirement. DMI utilized COSMIC's Ship Motion and Sea Load Computer program to perform analysis which could not be accomplished by other means. If approved for conversion, Glomar Explorer is expected to begin operations as a drillship in 1984.
48 CFR 1419.803 - Selecting acquisitions for the 8(a) Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Selecting acquisitions for the 8(a) Program. 1419.803 Section 1419.803 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Contracting with the Small Business Administration...
Maritime Pre-Positioning Force-Future: Bill Payer or Sea Basing Enabler?
2008-03-25
Ship Building Plan , UAV CLASSIFICATION: Unclassified Actions at sea no longer suffice to influence world events; actions from the sea must...in amphibious ships or fall victim to an untenable Navy ship building plan . Premature consideration of cost issues hindered MPF-F program...fiscal environment and an illusory Navy ship building plan . Given the demonstrated capability and success of the current Maritime Pre-positioning
Measurement and Analysis of L-Band (1535-1660 MHz) Electromagnetic (EM) Noise on Ships
DOT National Transportation Integrated Search
1974-12-01
A program of L-band (1535-1660 MHz) electromagnetic (EM) noise measurements conducted on ships is described. The magnitude and duration of EM noise on ships is of particular significance in terms of potential radio frequency interference (RFI) to fut...
Kaplan, Giora; Shahar, Yael; Tal, Orna
2017-06-01
The National Health Insurance Law in Israel ensures basic health basket eligibility for all its citizens. A supplemental health insurance plan (SHIP) is offered for an additional fee. Over the years, the percentage of supplemental insurance's holders has risen considerably, ranking among the highest in OECD countries. The assumption that consumers implement an informed rational choice based on relevant information is doubtful. Are consumers sufficiently well informed to make market processes work well? To examine perspectives, preferences and knowledge of Israelis in relation to SHIP. A telephone survey was conducted with a representative sample of the Israeli adult population. 703 interviews were completed. The response rate was 50.3%. 85% of the sample reported possessing SHIP. This survey found that most of the Israeli public parched additional insurance coverage however did not show a significant knowledge about the benefits provided by the supplementary insurance, at least in the three measurements used in this study. The scope of SHIP acquisition is very broad and cannot be explained in economic terms alone. Acquiring SHIP became a default option rather than an active decision. It is time to review the goals, achievements and side effects of SHIP and to create new policy for the future. Copyright © 2017 Elsevier B.V. All rights reserved.
Coordinating Council. Seventh Meeting: Acquisitions
NASA Technical Reports Server (NTRS)
1992-01-01
The theme for this NASA Scientific and Technical Information Program Coordinating Council meeting was Acquisitions. In addition to NASA and the NASA Center for AeroSpace Information (CASI) presentations, the report contains fairly lengthy visuals about acquisitions at the Defense Technical Information Center. CASI's acquisitions program and CASI's proactive acquisitions activity were described. There was a presentation on the document evaluation process at CASI. A talk about open literature scope and coverage at the American Institute of Aeronautics and Astronautics was also given. An overview of the STI Program's Acquisitions Experts Committee was given next. Finally acquisitions initiatives of the NASA STI program were presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-24
... Certificate, as prescribed in 225.1101(1), requires an offeror to identify, in its proposal, supplies that are... in 225.1101(4), requires the contractor to provide information on shipping documents and customs... of origin. DFARS 252.225-7020, Trade Agreements Certificate, as prescribed in 225.1101(5), requires...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... contract clause and clause prescription to cover both commercial and Government bills of lading, and to... CONTACT: Ms. Meredith Murphy, Procurement Analyst, telephone 571-372-6098. SUPPLEMENTARY INFORMATION: I... relocate information from DFARS subpart 242.14 to DFARS part 247 to align with changes to the Federal...
Warfighting and Logistic Support of Joint Forces from the Joint Sea Base
2007-01-01
Intel- ligence Community. For more information on RAND’s Acquisition and Technology Policy Center, contact the Director, Philip Antón. He can be reached...This is similar to ships such as the 225-meter MV American Cor- morant , a float-on/float-off heavy lift semisubmersible vessel, and the pumping
Code of Federal Regulations, 2012 CFR
2012-10-01
... Requirements for Unclassified Information Technology Resources. __3052.204-71Contractor Employee Access... Regulations for Ship Repair. (USCG) __3052.217-100Guarantee. (USCG) __3052.219-70Small Business Subcontracting.... (USCG) __3052.228-92Fair Market Value of Aircraft. (USCG) __3052.228-93Risk and Indemnities. (USCG...
Code of Federal Regulations, 2014 CFR
2014-10-01
... Requirements for Unclassified Information Technology Resources. __3052.204-71Contractor Employee Access... Regulations for Ship Repair. (USCG) __3052.217-100Guarantee. (USCG) __3052.219-70Small Business Subcontracting.... (USCG) __3052.228-92Fair Market Value of Aircraft. (USCG) __3052.228-93Risk and Indemnities. (USCG...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Requirements for Unclassified Information Technology Resources. __3052.204-71Contractor Employee Access... Regulations for Ship Repair. (USCG) __3052.217-100Guarantee. (USCG) __3052.219-70Small Business Subcontracting.... (USCG) __3052.228-92Fair Market Value of Aircraft. (USCG) __3052.228-93Risk and Indemnities. (USCG...
48 CFR 52.247-58 - Loading, Blocking, and Bracing of Freight Car Shipments.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Bracing of Freight Car Shipments. 52.247-58 Section 52.247-58 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.247-58 Loading, Blocking, and Bracing of Freight Car Shipments. As... be shipped in carload lots by rail: Loading, Blocking, and Bracing of Freight Car Shipments (APR 1984...
48 CFR 52.247-58 - Loading, Blocking, and Bracing of Freight Car Shipments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Bracing of Freight Car Shipments. 52.247-58 Section 52.247-58 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.247-58 Loading, Blocking, and Bracing of Freight Car Shipments. As... be shipped in carload lots by rail: Loading, Blocking, and Bracing of Freight Car Shipments (APR 1984...
48 CFR 52.247-58 - Loading, Blocking, and Bracing of Freight Car Shipments.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Bracing of Freight Car Shipments. 52.247-58 Section 52.247-58 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.247-58 Loading, Blocking, and Bracing of Freight Car Shipments. As... be shipped in carload lots by rail: Loading, Blocking, and Bracing of Freight Car Shipments (APR 1984...
48 CFR 52.247-58 - Loading, Blocking, and Bracing of Freight Car Shipments.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Bracing of Freight Car Shipments. 52.247-58 Section 52.247-58 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.247-58 Loading, Blocking, and Bracing of Freight Car Shipments. As... be shipped in carload lots by rail: Loading, Blocking, and Bracing of Freight Car Shipments (APR 1984...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-30
... numbers, such as tail numbers/hull numbers and equipment registration, in human-readable format on major...., aircraft tail numbers or ship hull numbers in military operations, the number of small entities impacted by... contractors apply Government-assigned serial numbers, such as tail numbers/hull numbers and equipment...
48 CFR 52.247-58 - Loading, Blocking, and Bracing of Freight Car Shipments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... be shipped in carload lots by rail: Loading, Blocking, and Bracing of Freight Car Shipments (APR 1984... Bracing of Freight Car Shipments. 52.247-58 Section 52.247-58 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.247-58 Loading, Blocking, and Bracing of Freight Car Shipments. As...
10 CFR 626.6 - Acquiring oil by direct purchase.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., DOE may increase the rate of purchases if prices fall below recent price trends or futures markets... accordance with the FAR and the DEAR. (b) Acquisition strategy. (1) DOE solicitations: (i) May be either... availability of ships, pipelines and terminals to move and receive the oil. (3) Based on the market analysis...
Gastrointestinal illness on passenger cruise ships, 1975-1978.
Dannenberg, A L; Yashuk, J C; Feldman, R A
1982-01-01
Following investigations in 1972-1973 of outbreaks of enteric disease on cruise ships using American ports, a surveillance system was established which required that 24 hours before arrival in port, each ship report the number of persons with diarrheal illness seen by the ship's physician during the cruise. The reported data were found to be reliable; they established a baseline incidence for diarrhea on cruise ships. A significantly high portion of enteric disease outbreaks occurred on vessels that did not pass routine annual or semiannual sanitation inspections. The cruise ship sanitation program, developed with the cooperation of the cruise ship industry and the Centers for Disease Control, appears to have been successful in reducing the overall rate of cruise ship associated outbreaks of enteric illness. PMID:7065338
Multifunctional Information Distribution System (MIDS)
2015-12-01
UNCLASSIFIED 2 Table of Contents Common Acronyms and Abbreviations for MDAP Programs 3 Program Information 5 Responsible Office 5...Contracts 77 Deliveries and Expenditures 84 Operating and Support Cost 85 Common Acronyms and Abbreviations for MDAP Programs Acq O&M...Acquisition-Related Operations and Maintenance ACAT - Acquisition Category ADM - Acquisition Decision Memorandum APB - Acquisition Program Baseline
Flight Test of the Engine Fuel Schedules of the X-43A Hyper-X Research Vehicles
NASA Technical Reports Server (NTRS)
Jones, Thomas
2006-01-01
The Hyper-X program flew two X-43A Hyper-X Research Vehicles (HXRVs) in 2004, referred to as Ship 2 and Ship 3. The scramjet engine of the X-43A research vehicle was autonomously controlled in flight to track a predetermined fueling schedule. Ship 2 flew at approximately Mach 7 and Ship 3 flew at approximately Mach 10.
Ship Detection in SAR Image Based on the Alpha-stable Distribution
Wang, Changcheng; Liao, Mingsheng; Li, Xiaofeng
2008-01-01
This paper describes an improved Constant False Alarm Rate (CFAR) ship detection algorithm in spaceborne synthetic aperture radar (SAR) image based on Alpha-stable distribution model. Typically, the CFAR algorithm uses the Gaussian distribution model to describe statistical characteristics of a SAR image background clutter. However, the Gaussian distribution is only valid for multilook SAR images when several radar looks are averaged. As sea clutter in SAR images shows spiky or heavy-tailed characteristics, the Gaussian distribution often fails to describe background sea clutter. In this study, we replace the Gaussian distribution with the Alpha-stable distribution, which is widely used in impulsive or spiky signal processing, to describe the background sea clutter in SAR images. In our proposed algorithm, an initial step for detecting possible ship targets is employed. Then, similar to the typical two-parameter CFAR algorithm, a local process is applied to the pixel identified as possible target. A RADARSAT-1 image is used to validate this Alpha-stable distribution based algorithm. Meanwhile, known ship location data during the time of RADARSAT-1 SAR image acquisition is used to validate ship detection results. Validation results show improvements of the new CFAR algorithm based on the Alpha-stable distribution over the CFAR algorithm based on the Gaussian distribution. PMID:27873794
ERIC Educational Resources Information Center
Porter, Rosalie Pedalino, Ed.
2001-01-01
The first article, "The Cost of English Acquisition Programs: Arizona Department of Education English Acquisition Cost Study" contains excerpts from a study (Phases 1 and 4) conducted for the Arizona Department of Education on the costs of various English-acquisition programs. Six successful but varied English-acquisition programs for…
48 CFR 2801.603-1 - Department of Justice Acquisition Career Management Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Representatives, or equivalent positions. (c) The program shall include: (1) Management information system... acquisition workforce management information system. (2) Individual assessments and development plans for... Acquisition Career Management Program. 2801.603-1 Section 2801.603-1 Federal Acquisition Regulations System...
10 CFR 26.117 - Preparing urine specimens for storage and shipping.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Preparing urine specimens for storage and shipping. 26.117 Section 26.117 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.117 Preparing urine specimens for storage and shipping. (a) Both the donor and the collector...
10 CFR 26.117 - Preparing urine specimens for storage and shipping.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Preparing urine specimens for storage and shipping. 26.117 Section 26.117 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.117 Preparing urine specimens for storage and shipping. (a) Both the donor and the collector...
10 CFR 26.117 - Preparing urine specimens for storage and shipping.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Preparing urine specimens for storage and shipping. 26.117 Section 26.117 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.117 Preparing urine specimens for storage and shipping. (a) Both the donor and the collector...
10 CFR 26.117 - Preparing urine specimens for storage and shipping.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Preparing urine specimens for storage and shipping. 26.117 Section 26.117 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.117 Preparing urine specimens for storage and shipping. (a) Both the donor and the collector...
10 CFR 26.117 - Preparing urine specimens for storage and shipping.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Preparing urine specimens for storage and shipping. 26.117 Section 26.117 Energy NUCLEAR REGULATORY COMMISSION FITNESS FOR DUTY PROGRAMS Collecting Specimens for Testing § 26.117 Preparing urine specimens for storage and shipping. (a) Both the donor and the collector...
Strategic Sealift: Part of the National Defense Reserve Fleet Is No Longer Needed
1991-10-01
would prevent MARAD from obtaining fair value for the scrapped ships and affect its ability to acquire newer ships for the Reserve Fleet. They also...Ship Exchange Program Offers are reviewed by a three-member MARAD vessel disposal committee to determine whether they reflect fair value for the
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-19
... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 212 and 252 RIN 0750-AH27 Defense Federal Acquisition Regulation Supplement; Pilot Program for Acquisition of Military-Purpose Nondevelopmental Items (DFARS Case 2011-D034) AGENCY: Defense Acquisition Regulations System...
Investigation of propulsion system for large LNG ships
NASA Astrophysics Data System (ADS)
Sinha, R. P.; Nik, Wan Mohd Norsani Wan
2012-09-01
Requirements to move away from coal for power generation has made LNG as the most sought after fuel source, raising steep demands on its supply and production. Added to this scenario is the gradual depletion of the offshore oil and gas fields which is pushing future explorations and production activities far away into the hostile environment of deep sea. Production of gas in such environment has great technical and commercial impacts on gas business. For instance, laying gas pipes from deep sea to distant receiving terminals will be technically and economically challenging. Alternative to laying gas pipes will require installing re-liquefaction unit on board FPSOs to convert gas into liquid for transportation by sea. But, then because of increased distance between gas source and receiving terminals the current medium size LNG ships will no longer remain economical to operate. Recognizing this business scenario shipowners are making huge investments in the acquisition of large LNG ships. As power need of large LNG ships is very different from the current small ones, a variety of propulsion derivatives such as UST, DFDE, 2-Stroke DRL and Combined cycle GT have been proposed by leading engine manufacturers. Since, propulsion system constitutes major element of the ship's capital and life cycle cost, which of these options is most suited for large LNG ships is currently a major concern of the shipping industry and must be thoroughly assessed. In this paper the authors investigate relative merits of these propulsion options against the benchmark performance criteria of BOG disposal, fuel consumption, gas emissions, plant availability and overall life cycle cost.
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2017-03-21
the 75th and 76th ships in the class. The 10 DDG-51s programmed for procurement in FY2013-FY2017 (in annual quantities of 3-1-2-2-2) are being...procured under the 10- ship MYP contract for FY2013-FY2017. The Navy, in its budget submission, notes this additional $1 billion in funding for the DDG...two DDG-51s requested for procurement in FY2017 at $3,393.9 million. The ships have received a total of $182.6 million in prior-year advance procurement
Automated Support for Naval Ship Acquisition Management
1980-12-01
activi- ties. Another contains data of joint interest to MAT08, PMS1 and PMS2 . A third contains data to be accessed by SEA90, PMS2 , and PARM1. Note...PMS1, PMS2 , PARM1, SUPSHIP1, SUPSHIP2 - are names of organizational units; each unit may access databases labelled with it§ name. Figure 5.1
T-FLAP improvement for VOS Program
NASA Astrophysics Data System (ADS)
Marcelli, Marco; Piermattei, Viviana; Madonia, Alice; Mainardi, Umberto; Manzella, Giuseppe M. R.
2010-05-01
The operational oceanography has been engaged in the development of new acquisition, transmission and assimilation systems in order to have the widest possible coverage of real time informations, reflecting the guidelines of the World Meteorological Organization (WMO) and of the Intergovernmental Oceanographic Commission (IOC). Physical and biological processes of marine ecosystems have a high spatial and temporal variability, whose study is possible only through high resolution and synoptic observations. More than for the physical variables, the biological ones have to be observed in situ. Especially in the mid-high latitudes, a deep observation of the water column is needed, because of the typical distribution of phytoplankton's biomass (Mann and Lazier, 1991). In the last times an extensive use of XBT was performed in order to provide near real time analysis of the ocean temperature, but there is still a lack in the biomass estimation. T-FLAP technology (Temperature and Fluorescence LAunchable Probe - Marcelli et al. 2007) was designed to answer to the claim of a cost effective temperature and fluorescence autonomous probe, to be used on ships of opportunity for the Voluntary Observing Ship Program (VOS). During the last three years the probe was upgraded and improved both in materials and in measure sensitivity. New LEDs were mounted to increase the radiant power of the excitation source.. In order to evaluate the red filter efficiency to detect fluorescence chlorophyll a emission wavelengths, transmittance of new available filters in the range 682-685 nm was calculated. In vivo fluorescence spectra of each filter were also performed on samples from Chlorella sp. cultures, to assess the percentage of the fluorescence emission peak transmitted by the filters. A multiple system was designed and realized for a high accuracy dynamic calibration of the probes.
48 CFR 212.7002 - Pilot program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...
48 CFR 212.7002 - Pilot program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...
Tappis, Hannah; Doocy, Shannon; Amoako, Stephen
2013-01-01
ABSTRACT Despite decades of support for international food assistance programs by the U.S. Agency for International Development (USAID) Office of Food for Peace, relatively little is known about the commodity pipeline and management issues these programs face in post-conflict and politically volatile settings. Based on an audit of the program's commodity tracking system and interviews with 13 key program staff, this case study documents the experiences of organizations implementing the first USAID-funded non-emergency (development) food assistance program approved for Sudan and South Sudan. Key challenges and lessons learned in this experience about food commodity procurement, transport, and management may help improve the design and implementation of future development food assistance programs in a variety of complex, food-insecure settings around the world. Specifically, expanding shipping routes in complex political situations may facilitate reliable and timely commodity delivery. In addition, greater flexibility to procure commodities locally, rather than shipping U.S.-procured commodities, may avoid unnecessary shipping delays and reduce costs. PMID:25276532
48 CFR 22.804 - Affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Affirmative action programs. 22.804 Section 22.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Affirmative action programs. ...
48 CFR 22.804 - Affirmative action programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Affirmative action programs. 22.804 Section 22.804 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Affirmative action programs. ...
Navy Littoral Combat Ship (LCS) Program: Oversight Issues and Options for Congress
2007-07-18
including unmanned vehicles (UVs). The basic version of the LCS, without any mission packages, is referred to as the LCS sea frame. The first LCS was...Littoral Combat Ship (LCS). The LCS is a small, fast ship that uses modular “plug-and- fight” mission packages, including unmanned vehicles (UVs). The...fight” mission packages, including unmanned vehicles (UVs). Rather than being a multimission ship like the Navy’s current large surface combatants
TELECOMMUNICATIONS. GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Program
2002-04-01
Reform, House of RepresentativesApril 2002 TELECOMMUNICATIONS GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Programa GAO-02...Needed to Realize Benefits of Metropolitan Area Acquisition Program Contract Number Grant Number Program Element Number Author(s) Project Number...TELECOMMUNICATIONS GSA Action Needed to Realize Benefits of Metropolitan Area Acquisition Program This is a test for developing highlights for a GAO report
9975 SHIPPING PACKAGE LIFE EXTENSION SURVEILLANCE PROGRAM RESULTS SUMMARY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunn, K.; Daugherty, W.; Hackney, B.
2011-05-27
Results from the 9975 shipping package Storage and Surveillance Program at the Savannah River Site (SRS) are summarized for justification to extend the life of the 9975 packages currently stored in the K-Area Complex (KAC). This justification is established with the stipulation that surveillance activities will continue throughout the extended time to ensure the continued integrity of the 9975 materials of construction and to further understand the currently identified degradation mechanisms. The 10 year storage life justification was developed prior to storage. A subsequent report was later used to validate the qualification of the 9975 shipping packages for 10 yearsmore » in storage. However the qualification for the storage period was provided by the monitoring requirements of the 9975 Storage and Surveillance Program. This report summarizes efforts to determine a new safe storage limit for the 9975 shipping package based on the surveillance data collected since 2005 when the 9975 Storage and Surveillance Program began. The Program has demonstrated that the 9975 package has a robust design that can perform under a variety of conditions. The primary emphasis of the on-going 9975 Storage and Surveillance Program is an aging study of the 9975 Viton{reg_sign} containment vessel O-rings and the Celotex{reg_sign} fiberboard thermal insulation at bounding conditions of radiation, elevated temperatures and/or elevated humidity.« less
2011-10-01
specific modules as needed. The term “startup” is inclusive of any point in a DoD acquisition program. As noted above, methodology for conducting...Acquisition Sustainment =Decision Point =Milestone Review =Decision Point if PDR is not conducted before Milestone B ProgramA B Initiation) C IOC FOC...start a new program 2.2 Background Conclusions flowing from these observations led the Office of the Secretary of Defense, the De - fense Acquisition
2008 13th Expeditionary Warfare Conference
2008-10-23
Ships 6 Joint High Speed Vessel (JHSV) • Program Capability – High speed lift ship capable of transporting cargo and personnel across intra... high - speed aluminum trimaran hullform that enables the ship to reach sustainable speeds of over 40 knots and range in excess of 3,500 nautical miles...advancing concepts for a very high speed , manned submersible,
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false SBA acceptance under partnership agreements for acquisitions exceeding the simplified acquisition threshold. 2419.804-370 Section 2419.804-370 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false SBA acceptance under partnership agreements for acquisitions exceeding the simplified acquisition threshold. 2419.804-370 Section 2419.804-370 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS...
48 CFR 801.690-1 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Acquisition Continuing Education Program, a program to provide VA's acquisition workforce with classroom knowledge to further develop their acquisition skills. The program supports VA personnel in the GS 1102... Certification (see OFPP Policy Letter 05-01, paragraph 8) means a certification program developed by the Federal...
Navy Nuclear-Powered Surface Ships: Background, Issues, and Options for Congress
2008-10-03
the use of nuclear power to a wider array of Navy surface ships, including the Navy’s planned CG(X) cruiser. Section 1012 of the FY2008 Defense...wider array of Navy surface ships, starting with the Navy’s planned CG(X) cruiser. Section 1012 of the FY2008 Defense Authorization Act (H.R. 4986...CG(X) Cruiser Program: Background, Oversight Issues, and Options for Congress, by Ronald O’Rourke. 8 For more on the Navy’s 313-ship plan , see CRS
2015-05-18
fees and no tracking. 44 One of its great strengths is that it is designed to be customized to meet the needs of a specific program, mission or...moved on large vessels, detection is complicated. Additionally, the level of the radiation background on and in the immediate vicinity of the ship... on land and surrounding a ship on the water. (3) Simulating a radiation signature emitted from nuclear material aboard a ship using radiation
NASA Astrophysics Data System (ADS)
Pinner, J. W., IV
2016-02-01
Data from shipboard oceanographic sensors are collected in various ASCii, binary, open and proprietary formats. Acquiring all of these formats using single, monolithic data acquisition system (DAS) can be cumbersome, complex and difficult to adapt for the ever changing suite of emerging oceanographic sensors. Another approach to the at-sea data acquisition challenge is to utilize multiple DAS software packages and corral the resulting data files with a ship-wide data management system. The Open Vessel Data Management project (OpenVDM) implements this second approach to ship-wide data management and over the last three years has successfully demonstrated it's ability to deliver a consistent cruise data package to scientists while reducing the workload placed on marine technicians. In addition to meeting the at-sea and post-cruise needs of scientists OpenVDM is helping vessel operators better adhere to the recommendations and best practices set forth by 3rd party data management and data quality groups such as R2R and SAMOS. OpenVDM also includes tools for supporting telepresence-enabled ocean research/exploration such as bandwidth-efficient ship-to-shore data transfers, shore-side data access, data visualization and near-real-time data quality tests and data statistics. OpenVDM is currently operating aboard three vessels. The R/V Endeavor, operated by the University of Rhode Island, is a regional-class UNOLS research vessel operating under the traditional NFS, P.I. driven model. The E/V Nautilus, operated by the Ocean Exploration Trust specializes in ROV-based, telepresence-enabled oceanographic research. The R/V Falkor operated by the Schmidt Ocean Institute is an ocean research platform focusing on cutting-edge technology development. These three vessels all have different missions, sensor suites and operating models yet all are able to leverage OpenVDM for managing their unique datasets and delivering a more consistent cruise data package to scientists and data archives.
NASA Astrophysics Data System (ADS)
Johnson, P. D.; Ferrini, V. L.; Jerram, K.
2016-12-01
In 2015 the National Science Foundation funded the University of New Hampshire's Center for Coastal and Ocean Mapping and Lamont-Doherty Earth Observatory, for the second time, to coordinate the effort of standardizing the quality of multibeam echosounder (MBES) data across the U.S. academic fleet. This effort supports 9 different ship operating institutions who manage a total of 12 multibeam-equipped ships carrying 6 different MBES systems, manufactured by two different companies. These MBES are designed to operate over a very wide range of depths and operational modes. The complexity of this endeavor led to the creation of the Multibeam Advisory Committee (MAC), a team of academic and industry experts whose mission is to support the needs of the U.S academic fleet's multibeam echo sounders through all of the phases of the "life" of a MBES system and its data, from initial acceptance of the system, to recommendations on at-sea acquisition of data, to validation of already installed systems, and finally to the post-survey data evaluation. The main activities of the MAC include 1.) standardizing both the Shipboard Acceptance Testing of all new systems and Quality Assurance Testing of already installed systems, 2.) working with the both the ship operators/technicians and the manufacturers of the multibeam systems to guarantee that each MBES is working at its peak performance level, 3.) developing tools that aid in the collection of data, assessment of the MBES hardware, and evaluation of the quality of the MBES data, 4.) creating "best practices" documentation concerning data acquisition and workflow, and 5.) providing a website, http://mac.unols.org, to host technical information, tools, reports, and a "help desk" for operators of the systems to ask questions concerning issues that they see with their systems.
Modular data acquisition system and its use in gas-filled detector readout at ESRF
NASA Astrophysics Data System (ADS)
Sever, F.; Epaud, F.; Poncet, F.; Grave, M.; Rey-Bakaikoa, V.
1996-09-01
Since 1992, 18 ESRF beamlines are open to users. Although the data acquisition requirements vary a lot from one beamline to another, we are trying to implement a modular data acquisition system architecture that would fit with the maximum number of acquisition projects at ESRF. Common to all of these systems are large acquisition memories and the requirement to visualize the data during an acquisition run and to transfer them quickly after the run to safe storage. We developed a general memory API handling the acquisition memory and its organization and another library that provides calls for transferring the data over TCP/IP sockets. Interesting utility programs using these libraries are the `online display' program and the `data transfer' program. The data transfer program as well as an acquisition control program rely on our well-established `device server model', which was originally designed for the machine control system and then successfully reused in beamline control systems. In the second half of this paper, the acquisition system for a 2D gas-filled detector is presented, which is one of the first concrete examples using the proposed modular data acquisition architecture.
Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress
2008-11-21
PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...optimal construction sequence and application of lessons learned for follow-on vessels in these programs. In the LPD 17 program, the Navy’s reliance on an...I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to
Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress
2011-04-20
and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...construction sequence and application of lessons learned for follow-on vessels in these programs. In the LPD 17 program, the Navy’s reliance on an immature...deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the aftermath of Hurricane Katrina, particularly in regard to
Navy DDG-1000 and DDG-51 Destroyer Programs: Background, Oversight Issues, and Options for Congress
2008-10-22
House Armed Services Committee, Navy officials announced a major change in the service’s position on what kind of destroyers it wants to procure over the...software program for the Aegis combat system and the arming of the ship with the SM-3, a version of the Navy’s Standard Missile that is designed for BMD...Assistant Secretary of the Navy (Ship Programs), before the Subcommittee on Seapower and Expeditionary Forces of the House Armed Services Committee, on
Transfer Learning with Convolutional Neural Networks for SAR Ship Recognition
NASA Astrophysics Data System (ADS)
Zhang, Di; Liu, Jia; Heng, Wang; Ren, Kaijun; Song, Junqiang
2018-03-01
Ship recognition is the backbone of marine surveillance systems. Recent deep learning methods, e.g. Convolutional Neural Networks (CNNs), have shown high performance for optical images. Learning CNNs, however, requires a number of annotated samples to estimate numerous model parameters, which prevents its application to Synthetic Aperture Radar (SAR) images due to the limited annotated training samples. Transfer learning has been a promising technique for applications with limited data. To this end, a novel SAR ship recognition method based on CNNs with transfer learning has been developed. In this work, we firstly start with a CNNs model that has been trained in advance on Moving and Stationary Target Acquisition and Recognition (MSTAR) database. Next, based on the knowledge gained from this image recognition task, we fine-tune the CNNs on a new task to recognize three types of ships in the OpenSARShip database. The experimental results show that our proposed approach can obviously increase the recognition rate comparing with the result of merely applying CNNs. In addition, compared to existing methods, the proposed method proves to be very competitive and can learn discriminative features directly from training data instead of requiring pre-specification or pre-selection manually.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Procedures. 19.1007 Section 19.1007 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program 19.1007 Procedures...
48 CFR 19.1004 - Participating agencies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Participating agencies. 19.1004 Section 19.1004 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program 19.1004...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Exclusions. 19.1006 Section 19.1006 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program 19.1006 Exclusions...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Purpose. 19.1003 Section 19.1003 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program 19.1003 Purpose. The...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 19.1002 Section 19.1002 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program 19.1002 Definitions...
1995-11-01
SHIP PRODUCTION COMMITTEE FACILITIES AND ENVIRONMENTAL EFFECTS SURFACE PREPARATION AND COATINGS DESIGN/PRODUCTION INTEGRATION HUMAN RESOURCE...we’re all about. 2 Exhibit 1 NATIONAL SHIPBUILDING RESEARCH PROGRAM RESEARCH PANELS SP-1 Facilities and Environmental Effects SP-3 Surface... effectively compete in the international commercial shipbuilding market. On November 30,1993, President Clinton signed into law the National
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gerhard, M.A.; Sommer, S.C.
1995-04-01
AUTOCASK (AUTOmatic Generation of 3-D CASK models) is a microcomputer-based system of computer programs and databases developed at the Lawrence Livermore National Laboratory (LLNL) for the structural analysis of shipping casks for radioactive material. Model specification is performed on the microcomputer, and the analyses are performed on an engineering workstation or mainframe computer. AUTOCASK is based on 80386/80486 compatible microcomputers. The system is composed of a series of menus, input programs, display programs, a mesh generation program, and archive programs. All data is entered through fill-in-the-blank input screens that contain descriptive data requests.
Design of integrated ship monitoring system using SAR, RADAR, and AIS
NASA Astrophysics Data System (ADS)
Yang, Chan-Su; Kim, Tae-Ho; Hong, Danbee; Ahn, Hyung-Wook
2013-06-01
When we talk about for the ship detection, identification and its classification, we need to go for the wide area of monitoring and it may be possible only through satellite based monitoring approach which monitors and covers coastal as well as the oceanic zone. Synthetic aperture radar (SAR) has been widely used to detect targets of interest with the advantage of the operating capability in all weather and luminance free condition (Margarit and Tabasco, 2011). In EU waters, EMSA(European Maritime Safety Agency) is operating the SafeSeaNet and CleanSeaNet systems which provide the current positions of all ships and oil spill monitoring information in and around EU waters in a single picture to Member States using AIS, LRIT and SAR images. In many countries, a similar system has been developed and the key of the matter is to integrate all available data. This abstract describes the preliminary design concept for an integration system of RADAR, AIS and SAR data for vessel traffic monitoring. SAR sensors are used to acquire image data over large coverage area either through the space borne or airborne platforms in UTC. AIS reports should be also obtained on the same date as of the SAR acquisition for the purpose to perform integration test. Land-based RADAR can provide ships positions detected and tracked in near real time. In general, SAR are used to acquire image data over large coverage area, AIS reports are obtained from ship based transmitter, and RADAR can monitor continuously ships for a limited area. In this study, we developed individual ship monitoring algorithms using RADAR(FMCW and Pulse X-band), AIS and SAR(RADARSAT-2 Full-pol Mode). We conducted field experiments two times for displaying the RADAR, AIS and SAR integration over the Pyeongtaek Port, South Korea.
Evaluation of the three-dimensional parabolic flow computer program SHIP
NASA Technical Reports Server (NTRS)
Pan, Y. S.
1978-01-01
The three-dimensional parabolic flow program SHIP designed for predicting supersonic combustor flow fields is evaluated to determine its capabilities. The mathematical foundation and numerical procedure are reviewed; simplifications are pointed out and commented upon. The program is then evaluated numerically by applying it to several subsonic and supersonic, turbulent, reacting and nonreacting flow problems. Computational results are compared with available experimental or other analytical data. Good agreements are obtained when the simplifications on which the program is based are justified. Limitations of the program and the needs for improvement and extension are pointed out. The present three dimensional parabolic flow program appears to be potentially useful for the development of supersonic combustors.
Developing Program Management Leadership for Acquisition Reform
2011-04-30
mêçÅÉÉÇáåÖë= çÑ=íÜÉ= bfdeqe=^kkr^i=^`nrfpfqflk== obpb^o`e=pvjmlpfrj== qeropa^v=pbppflkp== slirjb ff Developing Program Management Leadership for...4. TITLE AND SUBTITLE Developing Program Management Leadership for Acquisition Reform 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Developing Program Management Leadership for Acquisition Reform The 8th Annual Acquisition Research Symposium Panel #20: Investing in People
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false [Reserved] 19.801 Section 19.801 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Contracting With the Small Business Administration (the 8(a) Program) 19.801...
2007 Expeditionary Warfare Conference (12th)
2007-10-25
Ships 10 Joint High Speed Vessel (JHSV) Today • Program Capability – High speed lift ship capable of transporting cargo and personnel across...develop technologies that will: – Improve the capability to transfer cargo between Sea Base platforms – Provide for high speed / heavy lift...state actors for legitimacy and influence over the relevant population” Joint High Speed Vessel In-Service Amphibs LCAC & Ship to Shore
Ship cabin leakage alarm based on ARM SCM
NASA Astrophysics Data System (ADS)
Qu, Liyan
2018-03-01
If there is a leakage in the cabin of a sailing ship, it is a major accident that threatens the personnel and property of the ship. If we can’t take timely measures, there will be a devastating disaster. In order to judge the leakage of the cabin, it is necessary to set up a leakage alarm system, so as to achieve the purpose of detecting and alarming the leakage of the cabin, and avoid the occurrence of accidents. This paper discusses the design of ship cabin leakage alarm system based on ARM SCM. In order to ensure the stability and precision of the product, the hardware design of the alarm system is carried out, such as circuit design, software design, the programming of SCM, the software programming of upper computer, etc. It is hoped that it can be of reference value to interested readers.
Coast Guard: Opportunities Exist to Further Improve Acquisition Management Capabilities
2011-04-01
Coast Guard’s significant acquisition challenges, including project challenges in its Deepwater program. GAO’s prior work on the Coast Guard...to defense readiness. We have reported extensively on the Coast Guard’s significant acquisition challenges, including its Deepwater program, which...prior work on the Deepwater acquisition program identified problems in costs, management, and oversight that have led to delivery delays and other
Cost Estimating Relationships for U.S. Navy Ships
1983-09-01
ORGANIZATION NAME AND ADDRESS Institute for Defense Analyses iBOl North Beauregard Street Alexandria, Virginia 22311 10. PROGRAM ELEMENT, PROJECT ...linear CER also is displayed. In addi- tion. Table S-1 displays the total observed cost, the total estimated cost, and the percent difference...report provided by program year a total end cost for each ship by hull number including outfitting and post delivery costs. This end cost does not
2005-08-02
called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations
75 FR 38833 - Walker River Basin Acquisition Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... Acquisition Program recipient and has therefore determined National Environmental Policy Act (NEPA) compliance... that NEPA compliance is not required in the July 2009 Draft EIS and shared the decision at the August... address the lake's environmental conditions. Reclamation's role related to the Acquisition Program as...
48 CFR 19.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Encouraging small business... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.202-1 Encouraging small business participation in acquisitions. Small business concerns shall be afforded an equitable opportunity...
48 CFR 19.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Encouraging small business... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.202-1 Encouraging small business participation in acquisitions. Small business concerns shall be afforded an equitable opportunity...
48 CFR 19.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Encouraging small business... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.202-1 Encouraging small business participation in acquisitions. Small business concerns shall be afforded an equitable opportunity...
48 CFR 19.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Encouraging small business... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.202-1 Encouraging small business participation in acquisitions. Small business concerns shall be afforded an equitable opportunity...
48 CFR 19.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Encouraging small business... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 19.202-1 Encouraging small business participation in acquisitions. Small business concerns shall be afforded an equitable opportunity...
Supply Management Analysis of the Chilean Navy Acquisition System
2014-12-01
52 LIST OF REFERENCES Armada de Chile, N. (1986). Manual de Logistica de la Armada de Chile [Manual of logistics of the Chilean Navy]. Chile... transportation • Quality control • Demand and supply planning • Receiving, materials handling, and storage 11 • Material or inventory control...Order purchasing • Production planning, scheduling, and control • Warehousing and distribution • Shipping • Outbound transportation • Customer
Coast Guard Cutter Procurement: Background and Issues for Congress
2016-09-16
general- purpose cutters. They have an estimated average procurement cost of about $695 million per ship. The first five are now in service. The...general- purpose cutters. 13 The Coast Guard’s acquisition 8 The two one-of-a-kind cutters are the...the Senate Commerce, Science , and Transportation Committee, Subcommittee on Fisheries and the Coast Guard, Hearing on The Coast Guard’s Revised
NASA Astrophysics Data System (ADS)
Richman, Barbara T.
The Sedco/BP 471, owned jointly by Sedco, Inc., of Dallas, Tex., and British Petroleum, has been selected as the drill ship for the Ocean Drilling Program (ODP). The contract, with a specified initial term of 4 years with 10 1-year options after that, is expected to be signed by mid March by Texas A&M University, the ODP science operator, and Sedco, Inc. Texas A&M will develop the design for scientific and laboratory spaces aboard the Sedco/BP 471 and will oversee the ship conversion. Testing and shakedown of the ship is scheduled for the coming autumn; the first scientific cruise is scheduled for next January.One year ago, the commercial drilling market sagged, opening up the option for leasing a commercial drill ship (Eos, February 22, 1983, p. 73). Previously, the ship of choice had been the Glomar Explorer; rehabilitating the former CIA salvage ship would have been extremely expensive, however.
Cybersecurity:The Road Ahead for Defense Acquisition
2016-06-01
tion programs. A key challenge for DoD acquisition addressing the cyber threat is how do we “ bake in” cybersecurity for our DoD ac- quisition programs...cybersecurity must be “ baked in” the design of our warfighting systems. Supporting policy and best practices for effective cyberse- curity in acquisition...contacted at steve.mills@dau.mil and steve.monks@ dau.mil. A key challenge for DoD acquisition addressing the cyber threat is how do we “ bake in” cybersecurity for our DoD acquisition programs vs. “bolting it on.”
76 FR 14566 - Federal Acquisition Regulation; Socioeconomic Program Parity
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... 9000-AL88 Federal Acquisition Regulation; Socioeconomic Program Parity AGENCY: Department of Defense... Acquisition Regulation (FAR) to implement section 1347 of the ``Small Business Jobs Act of 2010.'' Section... acquisition will be restricted to small businesses participating in the 8(a), HUBZone, or service-disabled...
48 CFR 219.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Encouraging small business... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 219.202-1 Encouraging small business participation in acquisitions. See PGI 205.207(d)(ii) for...
48 CFR 219.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Encouraging small business... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 219.202-1 Encouraging small business participation in acquisitions. See PGI 205.207(d)(iii) for...
48 CFR 219.202-1 - Encouraging small business participation in acquisitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Encouraging small business... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 219.202-1 Encouraging small business participation in acquisitions. See PGI 205.207(d)(ii) for...
Major safety provisions in nuclear-powered ships
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khlopkin, N.S.; Belyaev, V.M.; Dubrovin, A.M.
1984-12-01
Considerable experience has been accumulated in the Soviet Union on the design, construction and operation of nuclear-powered civilian ships: the icebreakers Lenin, Leonid Brezhnev and Sibir. The nuclear steam plants (NSP) used on these as the main energy source have been found to be highly reliable and safe, and it is desirable to use them in the future not only in icebreakers but also in transport ships for use in ice fields. The Soviet program for building and developing nuclear-powered ships has involved careful attention to safety in ships containing NSP. The experience with the design and operation of nuclearmore » icebreakers in recent years has led to the revision of safety standards for the nuclear ships and correspondingly ship NSP and international guidelines have been developed. If one meets the requirements as set forth in these documents, one has a safe basis for future Soviet nuclear-powered ships. The primary safety provisions for NSP are presented in this paper.« less
Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress
2009-04-07
and Options for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs...statements among others, although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS
1995-01-01
CHALLENGE It is possible to divide the shipyard industry into three categories the yards which have no experience whatsoever with robot production...INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION AND TRAINING THE NATIONAL SHIPBUILDING RESEARCH PROGRAM January, 1995 NSRP 0439...1995 Ship Production Symposium Paper No . 10: Robot Technology in the Shipyard Production Environ- ment U.S. DEPARTMENT OF THE NAVY CARDEROCK DIVISION
Failure Is Not an Option: A Root Cause Analysis of Failed Acquisition Programs
2017-12-01
Kendall (2012, 2015). ..................................................................................4 Table 3. Description and Decision Authority...Assessment and Program Evaluation DAE Defense Acquisition Executive DAMIR Defense Acquisition Management Information Retrieval DARPA Defense Advanced...and evaluation OTA other transactions authority PARCA performance assessments and root cause analyses PBD program budget decisions PDR preliminary
Incidental Foreign-Language Acquisition by Children Watching Subtitled Television Programs
ERIC Educational Resources Information Center
Ina, Lekkai
2014-01-01
Series of international studies have shown that subtitled television programs provide a rich context for foreign language acquisition. This study investigated whether incidental language acquisition occurs from watching a television program with/without subtitles. Children in the experimental conditions watch: (a) a 15 minute snapshot of a well…
46 CFR 503.52 - Senior agency official.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false Senior agency official. 503.52 Section 503.52 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS PUBLIC INFORMATION Information Security...'s information security program, which includes oversight (self-inspection) and security information...
46 CFR 11.301 - Requirements for STCW officer endorsements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... specialist. (vii) Workshop skills training: Documentation of successful completion of assessments or... engineering—as appropriate. (ii) Training ship experience: Documentation of successful completion of an approved training program involving formal training and assessment onboard a training ship. (iii) Simulator...
2016-02-03
Response Cutter program and plans for its upcoming Offshore Patrol Cutter program, that the Coast Guard has matured its acquisition process. The process to...Cutter and Offshore Patrol Cutter programs. GAO reviewed these two programs in June 2014 (GAO-14-450) and April 2015 (GAO- 15-171SP) and also...Government Accountability Office areas of competition and the schedule for initial testing. Furthermore, as the $12 billion Offshore Patrol Cutter program
NASA Technical Reports Server (NTRS)
Pan, Y. S.; Drummond, J. P.; Mcclinton, C. R.
1978-01-01
Two parabolic flow computer programs, SHIP (a finite-difference program) and COMOC (a finite-element program), are used for predicting three-dimensional turbulent reacting flow fields in supersonic combustors. The theoretical foundation of the two computer programs are described, and then the programs are applied to a three-dimensional turbulent mixing experiment. The cold (nonreacting) flow experiment was performed to study the mixing of helium jets with a supersonic airstream in a rectangular duct. Surveys of the flow field at an upstream were used as the initial data by programs; surveys at a downstream station provided comparison to assess program accuracy. Both computer programs predicted the experimental results and data trends reasonably well. However, the comparison between the computations from the two programs indicated that SHIP was more accurate in computation and more efficient in both computer storage and computing time than COMOC.
Validation Test Report for WAVEWATCH III
2012-11-30
scales relevant to operation of a zodiac , to larger length-scales, relevant to activities on the largest ships, such as ship-to-ship transfer of...average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data...display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2012-03-02
challenging ship redesign as well as a new power and cooling architecture coupled with the challenges to construct such a dense ship, will make...costs. Our prior work has shown that construction of lead ships is challenging , the risk of cost growth is high, and having sufficient construction...not include a thorough trade-off analysis that would compare the relative costs and benefits of different solutions under consideration or provide
46 CFR 507.160 - Communications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false Communications. 507.160 Section 507.160 Shipping FEDERAL... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.160 Communications. (a) The agency shall take appropriate steps to ensure effective communication with applicants...
46 CFR 507.160 - Communications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 9 2013-10-01 2013-10-01 false Communications. 507.160 Section 507.160 Shipping FEDERAL... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.160 Communications. (a) The agency shall take appropriate steps to ensure effective communication with applicants...
46 CFR 507.160 - Communications.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 9 2014-10-01 2014-10-01 false Communications. 507.160 Section 507.160 Shipping FEDERAL... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.160 Communications. (a) The agency shall take appropriate steps to ensure effective communication with applicants...
46 CFR 507.160 - Communications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 9 2010-10-01 2010-10-01 false Communications. 507.160 Section 507.160 Shipping FEDERAL... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.160 Communications. (a) The agency shall take appropriate steps to ensure effective communication with applicants...
48 CFR 222.101-3-70 - Impact of labor disputes on defense programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Impact of labor disputes... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Basic Labor Policies 222.101-3-70 Impact of labor disputes on defense programs. (a...
F-16XL Ship #1 in flight - used for laminar airflow studies
NASA Technical Reports Server (NTRS)
1992-01-01
One of two F-16XL prototype aircraft, on loan from the Air Force, was used by NASA's Dryden Flight Research Center, Edwards, California, in a program to investigate laminar flow technology and help improve the flow of air over an aircraft's wing at sustained supersonic speeds. A small, perforated titanium wing glove with a turbo compressor was tested on the F-16XL to determine if air suction can remove a small part of the boundary-layer air flowing over the wing and thereby achieve laminar (smooth) flow over a portion of the wing. The flight research program on ship #1 ended in 1996. It was then conducted with NASA's two-seat F-16XL, ship #2 employing a larger glove.
Real-time shipboard displays for science operation and planning on CGC Healy
NASA Astrophysics Data System (ADS)
Roberts, S.; Chayes, D.; Arko, R.
2007-12-01
To facilitate effective science planning and decision making, we have developed a real-time geospatial browser and other displays widely used by many if not all members of USCGC Healy's science cruises and some officers and crew since 2004. In order to enable a 'zero-configuration' experience to the end user with nearly any modern browser, on any platform, anywhere on the ship with wired (or wireless) network access, we chose a Web-based/server-centric approach that provides a very low barrier to access in an environment where we have many participants constantly coming and going, often with their own computers. The principle interface for planning and operational decision making is a georeferenced, Web-based user interface built on the MapServer Web GIS platform developed at the University of Minnesota (http://mapserver.gis.umn.edu/), using the PostGIS spatial database extensions (http://postgis.refractions.net/) to enable live database connectivity. Data available include current ship position and orientation, historical ship tracks and data, seafloor bathymetry, station locations, RADARSAT, and subbottom profiles among others. In addition to the user interfaces that are part of individual instrumentation (such as the sonars and navigation systems), custom interfaces have been developed to centralize data with high update rates such as sea surface temperature, vessel attitude, position, etc. Underlying data acquisition and storage is provided by the Lamont Data System (LDS) and the NOAA SCS system. All data are stored on RAIDed disk systems and shared across a switched network with a gigabit fiber backbone. The real-time displays access data in a number of ways including real-time UDP datagrams from LDS, accessing files on disk, and querying a PostgreSQL relational backend. This work is supported by grants from the U.S. National Science Foundation, Office of Polar Programs, Arctic Science section.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... Competition Throughout the Life Cycle of Major Defense Acquisition Programs AGENCY: Defense Acquisition... subcontract level of the MDAP throughout its life cycle as a means to improve contractor performance; and (2...) throughout the program life cycle as a means to improve contractor performance; and (ii) Document the...
1991-04-11
Perplexed: Think Energy Again. Video Enhanced SECAT - An Energy Program; Quality Ship Service Power with an Integrated Diesel Electric Propulsion...DIesign Branch (5011), NAVSEA * "Think Energy Again! Video Enhanced SECAT - 5 An Energy Program"’ Hasan Pehlivan, Mechanical Engineer/Ship Trials, Surface...1.015, or 1.5% increase.) Association of Scientists and Engineers 28th Annual Technical Symposium, 11 April 1991 THINK ENERGY AGAIN! A VIDEO ENHANCED
1995-01-01
disputes increased by the fact that the industrial restructuring process coincided with the return of a great number of Spanish workers who were emigrants in...INNOVATION MARINE INDUSTRY STANDARDS WELDING INDUSTRIAL ENGINEERING EDUCATION AND TRAINING THE NATIONAL SHIPBUILDING RESEARCH PROGRAM January, 1995 NSRP 0439...1995 Ship Production Symposium Paper No . 14: Spanish Shipbuilding: Restructuring Process & Technologi- cal Updating From 1984-1994 U.S. DEPARTMENT OF
User Manual for Program SCOMOT Second Part of U.S.C.G. Ship Motion Program.
1981-02-01
wave angle, etc. - 52 - Entry 8 - Jl - First Index Number First index for motion calculation using coordinate points or moment and force calculations using...162.4 .6500 .5434 .2942 179.8 .6786 170.0 1.0258 161.8 1.4070 144.3 .7000 .4686 .1774 179.6 .5946 167.1 1.0292 154.8 1.2598 110.5 .7500 .4082 . 0786 ...SHIP MOTION PROGRAM 77.1 02/24/81 05.49.12 PAGE 52 SL-7 - NORMAL FULL LOAD DEPARTURE SPEED = 25.000 KNOTS REGULAR WAVE LATERAL BENDING MOMENT AT STATION
NASA Astrophysics Data System (ADS)
Cantwell, K. L.; Kennedy, B. R.; Malik, M.; Gray, L. M.; Elliott, K.; Lobecker, E.; Drewniak, J.; Reser, B.; Crum, E.; Lovalvo, D.
2016-02-01
Since it's commissioning in 2008, NOAA Ship Okeanos Explorer has used telepresence technology both as an outreach tool and as a new way to conduct interdisciplinary science expeditions. NOAA's Office of Ocean Exploration and Research (OER) has developed a set of collaboration tools and protocols to enable extensive shore-based participation. Telepresence offers unique advantages including access to a large pool of expertise on shore and flexibility to react to new discoveries as they occur. During early years, the telepresence experience was limited to Internet 2 enabled Exploration Command Centers, but with advent of improved bandwidth and new video transcoders, scientists from anywhere with an internet connection can participate in a telepresence expedition. Scientists have also capitalized on social media (Twitter, Facebook, Reddit etc.) by sharing discoveries to leverage the intellectual capital of scientists worldwide and engaging the general public in real-time. Aside from using telepresence to stream video off the ship, the high-bandwidth satellite connection allows for the transfer of large quantities of data in near real-time. This enables not only ship - shore data transfers, but can also support ship - ship collaborations as demonstrated during the 2015 and 2014 seasons where Okeanos worked directly with science teams onboard other vessels to share data and immediately follow up on features of interest, leading to additional discoveries. OER continues to expand its use of telepresence by experimenting with procedures to offload roles previously tied to the ship, such as data acquisition watch standers; prototyping tools for distributed user data analysis and video annotation; and incorporating in-situ sampling devices. OER has also developed improved tools to provide access to archived data to increase data distribution and facilitate additional discoveries post-expedition.
Naval Ships Acquisition Strategy for the Venezuelan Navy.
1982-06-01
Contract LAdministration Manual (SAC), Washington, D.C., 198 16. Congreso de Venezuela, Constitucion de la Republica de Venezuela X- Disposiciones ...Directiva D-MA-CGM-0030-A, Estado Mayor General de la Armada, Caracas, Venezuela, June 29, 1981. 23. Congress of the United States of America, Public...Fundamentos Estrategicos para la Escuadra Venezolana en eI Futuro, Armada- de -Venezuela, Escuela Superior de Guerra Naval, XI Curso de Comando y Estado
Corrosion Control in the US Navy: Ships & USMC Vehicles
2014-11-18
Mr. Matthew Koch Corrosion Control & Prevention Executive Presented by E. Dail Thomas II, Consultant 18 November 2014 Corrosion Control in... control number. 1. REPORT DATE 18 NOV 2014 2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE Corrosion Control in...and Technology DoD Corrosion Prevention and Control IPT Director, Corrosion Policy and Oversight USD Acquisition, Technology and Logistics ASD
48 CFR 23.103 - Sustainable acquisitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition Policy 23.103 Sustainable acquisitions. (a... the products are— (1) Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP...
48 CFR 23.103 - Sustainable acquisitions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SOCIOECONOMIC PROGRAMS ENVIRONMENT, ENERGY AND WATER EFFICIENCY, RENEWABLE ENERGY TECHNOLOGIES, OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Sustainable Acquisition Policy 23.103 Sustainable acquisitions. (a... the products are— (1) Energy-efficient (ENERGY STAR ® or Federal Energy Management Program (FEMP...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false [Reserved] 26.301 Section 26.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities and Minority Institutions 26...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Procedures. 19.602 Section 19.602 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Certificates of Competency and Determinations of Responsibility 19.602...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Procedures. 219.602 Section 219.602 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Certificates of Competency and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false [Reserved] 26.301 Section 26.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities and Minority Institutions 26...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false [Reserved] 26.301 Section 26.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities and Minority Institutions 26...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false [Reserved] 26.301 Section 26.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities and Minority Institutions 26...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false [Reserved] 26.301 Section 26.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities and Minority Institutions 26...
33 CFR 151.63 - Shipboard control of garbage.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL WASTE... Antarctic Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.63 Shipboard... plastics in ship stores. (6) Ongoing educational programs to train shipboard personnel of garbage handling...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false Notice. 507.111 Section 507.111 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.111 Notice. The...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false Application. 507.102 Section 507.102 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.102 Application. This...
46 CFR 507.104-507.109 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false [Reserved] 507.104-507.109 Section 507.104-507.109 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION...
46 CFR 507.104-507.109 - [Reserved
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 9 2014-10-01 2014-10-01 false [Reserved] 507.104-507.109 Section 507.104-507.109 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 9 2014-10-01 2014-10-01 false Application. 507.102 Section 507.102 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.102 Application. This...
46 CFR 507.141-507.148 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false [Reserved] 507.141-507.148 Section 507.141-507.148 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION...
46 CFR 507.112-507.129 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false [Reserved] 507.112-507.129 Section 507.112-507.129 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 9 2014-10-01 2014-10-01 false Notice. 507.111 Section 507.111 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.111 Notice. The...
46 CFR 507.131-507.139 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false [Reserved] 507.131-507.139 Section 507.131-507.139 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION...
46 CFR 507.112-507.129 - [Reserved
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 9 2014-10-01 2014-10-01 false [Reserved] 507.112-507.129 Section 507.112-507.129 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION...
33 CFR 151.63 - Shipboard control of garbage.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL WASTE... Antarctic Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.63 Shipboard... plastics in ship stores. (6) Ongoing educational programs to train shipboard personnel of garbage handling...
33 CFR 151.63 - Shipboard control of garbage.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL WASTE... Antarctic Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.63 Shipboard... plastics in ship stores. (6) Ongoing educational programs to train shipboard personnel of garbage handling...
33 CFR 151.63 - Shipboard control of garbage.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL WASTE... Antarctic Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.63 Shipboard... plastics in ship stores. (6) Ongoing educational programs to train shipboard personnel of garbage handling...
33 CFR 151.63 - Shipboard control of garbage.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) POLLUTION VESSELS CARRYING OIL, NOXIOUS LIQUID SUBSTANCES, GARBAGE, MUNICIPAL OR COMMERCIAL WASTE... Antarctic Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.63 Shipboard... plastics in ship stores. (6) Ongoing educational programs to train shipboard personnel of garbage handling...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 9 2010-10-01 2010-10-01 false Application. 507.102 Section 507.102 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.102 Application. This...
Ship Speed Retrieval From Single Channel TerraSAR-X Data
NASA Astrophysics Data System (ADS)
Soccorsi, Matteo; Lehner, Susanne
2010-04-01
A method to estimate the speed of a moving ship is presented. The technique, introduced in Kirscht (1998), is extended to marine application and validated on TerraSAR-X High-Resolution (HR) data. The generation of a sequence of single-look SAR images from a single- channel image corresponds to an image time series with reduced resolution. This allows applying change detection techniques on the time series to evaluate the velocity components in range and azimuth of the ship. The evaluation of the displacement vector of a moving target in consecutive images of the sequence allows the estimation of the azimuth velocity component. The range velocity component is estimated by evaluating the variation of the signal amplitude during the sequence. In order to apply the technique on TerraSAR-X Spot Light (SL) data a further processing step is needed. The phase has to be corrected as presented in Eineder et al. (2009) due to the SL acquisition mode; otherwise the image sequence cannot be generated. The analysis, when possible validated by the Automatic Identification System (AIS), was performed in the framework of the ESA project MARISS.
The Costs of Commonality: Examination of the JLTV as a Case Study
2016-07-15
Acquisition Research Program Graduate School of Business & Public Policy Naval Postgraduate School NPS-16-AM-151 ACQUISITION RESEARCH ... Research Program Graduate School of Business & Public Policy Naval Postgraduate School The research ...presented in this report was supported by the Acquisition Research Program of the Graduate School of Business & Public Policy at the Naval
Complex System Governance for Acquisition
2016-04-30
2014, September–October). Cybersecurity challenges for program managers . Defense AT&L. Naphade, M., Banavar, G., Harrison, C., Paraszczak, J...the Acquisition Research Program of the Graduate School of Business & Public Policy at the Naval Postgraduate School. To request defense...Dickmann, Vice President, Sonalysts Inc. A Complex Systems Perspective of Risk Mitigation and Modeling in Development and Acquisition Programs Roshanak
36th ATLANTA EXECUTIVE SEMINAR
2011-04-04
Elimination of Chemical Weapons Program. In addition, he is responsible for appointing, managing, and evaluating program executive officers as well as...little can be spared.” The National Commission of Fiscal responsibility, The Moment, December 2010 Slide 14 Congressional Weapon System Concerns ...Acquisition and Technology (A&T), and the Defense Acquisition Board on acquisition/procurement strategies for all major weapon systems programs
Initial Results from the STEM Student Experiences Aboard Ships (STEMSEAS) Program
NASA Astrophysics Data System (ADS)
Lewis, J. C.; Cooper, S. K.; Thomson, K.; Rabin, B.; Alberts, J.
2016-12-01
The Science Technology Engineering and Math Student Experiences Aboard Ships (STEMSEAS) program was created as a response to NSF's call (through GEOPATHS) for improving undergraduate STEM education and enhancing diversity in the geosciences. It takes advantage of unused berths on UNOLS ships during transits between expeditions. During its 2016 pilot year - which consisted of three transits on three different research vessels in different parts of the country, each with a slightly different focus - the program has gained significant insights into how best to create and structure these opportunities and create impact on individual students. A call for applications resulted in nearly 900 applicants for 30 available spots. Of these applicants, 32% are from minority groups underrepresented in the geosciences (Black, Hispanic, or American Indian) and 20% attend community colleges. The program was able to sail socioeconomically diverse cohorts and include women, veterans, and students with disabilities and from two- and four-year colleges. Twenty-three are underrepresented minorities, 6 attend community colleges, 5 attend an HBCU or tribal college, and many are at HSIs or other MSIs. While longer term impact assessment will have to wait, initial results and 6-month tracking for the first cohort indicate that these kinds of relatively short but intense experiences can indeed achieve significant impacts on students' perception of the geosciences, in their understanding of STEM career opportunities, their desire to work in a geoscience lab setting, and to incorporate geosciences into non-STEM careers. Insights were also gained into the successful makeup of mentor/leader groups, factors to consider in student selection, necessary pre- and post-cruise logistics management, follow-up activities, structure of activities during daily life at sea, increasing student networks and access to mentorships, and leveraging of pre-existing resources and ship-based opportunities. Additionally, lessons learned by working with multiple UNOLS ship operators can be applied to the growth of the program over time.
48 CFR 519.7016 - Program review.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Program review. 519.7016 Section 519.7016 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS GSA Mentor-Protégé Program 519.7016 Program review. At the conclusion of...
2016-12-01
and Maintenance ACAT - Acquisition Category ADM - Acquisition Decision Memorandum APB - Acquisition Program Baseline APPN - Appropriation APUC...Acquisition Program MILCON - Military Construction N/A - Not Applicable O&M - Operations and Maintenance ORD - Operational Requirements Document OSD...RMS) Contractor Location: 1151 Hermans Road Tucson, AZ 85756 Contract Number: N00024-13-C-5407/0 Contract Type: Firm Fixed Price (FFP) Award Date
2013-06-01
distribution is unlimited 12b. DISTRIBUTION CODE A 13. ABSTRACT (maximum 200 words) Some major defense acquisition programs (MDAPs) are cancelled...68 VI. PRACTICAL IMPLICATIONS FOR DEFENSE ACQUISITION .....................73 A . OVERVIEW...Contract Performance Report C /SCSC Cost/Schedule Control Systems Criteria CV Cost Variance CV % Cost Variance Percentage DAE Defense Acquisition
NASA Astrophysics Data System (ADS)
Laurent, D.
Soviet and U.S. programs involving satellites for surveillance of ships and submarines are discussed, considering differences in approaches. The Soviet program began with the Cosmos 198 in 1967 and the latest, the Cosmos 1400 series, 15 m long and weighing 5 tons, carry radar for monitoring ships and a nuclear reactor for a power supply. Other Soviet spacecraft carrying passive microwave sensors and ion drives powered by solar panels have recently been detonated in orbit for unknown reasons. It has also been observed that the Soviet satellites are controlled in pairs, with sequential orbital changes for one following the other, and both satellites then overflying the same points. In contrast, U.S. surveillance satellites have been placed in higher orbits, thus placing greater demands on the capabilities of the on-board radar and camera systems. Project White Cloud and the Clipper Bow program are described, noting the continued operation of the White Cloud spacecraft, which are equipped to intercept radio signals from surface ships. Currently, the integrated tactical surveillance system program has completed its study and a decision is expected soon.
Code of Federal Regulations, 2010 CFR
2010-10-01
... General. In accordance with the Federal Acquisition Certification—Program and Project Managers (FAC-P/PM) program, HHS has established a certification program for Program or Project Managers. See HHS' Federal Acquisition Certification—Program and Project Managers Handbook (P/PM Handbook) for information on the methods...
76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-31
...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Policy. 26.402 Section 26.402 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Food Donations to Nonprofit Organizations 26.402 Policy. The Government encourages...
48 CFR 19.809 - Preaward considerations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Preaward considerations. 19.809 Section 19.809 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Contracting With the Small Business Administration (the 8(a...
48 CFR 225.7016-2 - Restriction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the Ballistic Missile Defense Program. [68 FR 15627, Mar. 31, 2003. Redesignated at 74 FR 53413, Oct... Section 225.7016-2 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Authorization Acts, Appropriations Acts, and...
46 CFR 503.52 - Senior agency official.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 9 2010-10-01 2010-10-01 false Senior agency official. 503.52 Section 503.52 Shipping FEDERAL MARITIME COMMISSION GENERAL AND ADMINISTRATIVE PROVISIONS PUBLIC INFORMATION Information Security Program § 503.52 Senior agency official. The Chairman of the Commission shall designate a senior agency...
46 CFR 507.110 - Self-evaluation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... or organizations representing handicapped persons, to participate in the self-evaluation process by... 46 Shipping 9 2014-10-01 2014-10-01 false Self-evaluation. 507.110 Section 507.110 Shipping... BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.110 Self...
46 CFR 10.406 - Approved courses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Approved courses. 10.406 Section 10.406 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MERCHANT MARINER CREDENTIAL Training Courses and Programs § 10.406 Approved courses. The NMC maintains the list of training...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Evaluation. 30.30-9 Section 30.30-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS GENERAL PROVISIONS Interim Procedures for Evaluating Vessel Personnel Licensing and Certification Programs of Foreign Countries § 30.30-9 Evaluation. Materials...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 9 2010-10-01 2010-10-01 false Employment. 507.140 Section 507.140 Shipping FEDERAL... HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE FEDERAL MARITIME COMMISSION § 507.140 Employment. No qualified handicapped person shall, on the basis of handicap, be subjected to discrimination in employment...
1997-04-01
and New Zealand Industry Involvement ANZIP Australian and New Zealand Industry Program ASSC ANZAC Ship Support Centre ASTEC Australian Science...of performance measurement systems and benchmarking.” In September 1994, the Australian Science, Technology and Engineering Council ( ASTEC ) commenced...more in- depth analysis of the key issues facing Australia in a number of areas. Five Partnerships have been established, one of which is the ASTEC
Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress
2010-10-15
Issues, And Options For Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e . TASK NUMBER 5f...19 has been required, disrupting the optimal construction sequence and application of lessons learned for follow-on vessels in these programs. In...although not necessarily in the order shown below: • “I am deeply concerned about Northrop Grumman Ship Systems’ ( NGSS ) ability to recover in the
Navy DDG-1000 and DDG-51 Destroyer Programs: Background, Oversight Issues, and Options for Congress
2008-09-11
July 31, 2008, hearing before the Seapower and Expeditionary Forces subcommittee of the House Armed Services Committee, Navy officials announced a major...Aegis combat system and the arming of the ship with the SM-3, a version of the Navy’s Standard Missile that is designed for BMD operations.7 The Navy has...the Navy (Ship Programs), before the Subcommittee on Seapower and Expeditionary Forces of the House Armed Services Committee, on Surface Combatant
48 CFR 719.271 - Agency program direction and operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Agency program direction and operation. 719.271 Section 719.271 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271 Agency program direction and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
... Federal Acquisition Regulation Supplement; Balance of Payments Program Exemption for Commercial... Balance of Payments Program for construction material that is commercial information technology. DATES..., Balance of Payments Program--Construction Material, and 252.225- 7045, Balance of Payments Program...
48 CFR 719.271 - Agency program direction and operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Agency program direction and operation. 719.271 Section 719.271 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 719.271 Agency program direction and...
48 CFR 225.7704-3 - Solicitation provisions and contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... American-Trade Agreements-Balance of Payments Program solicitation provisions and contract clauses... ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Acquisitions in Support of Operations in Iraq or Afghanistan 225.7704-3 Solicitation provisions and contract...
48 CFR 3019.708 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clauses. 3019.708 Section 3019.708 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting...
48 CFR 219.505 - Rejecting Small Business Administration recommendations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Rejecting Small Business Administration recommendations. 219.505 Section 219.505 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Policy. 226.370-3 Section 226.370-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Policy. 226.370-3 Section 226.370-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
48 CFR 26.303 - Data collection and reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Data collection and reporting requirements. 26.303 Section 26.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Policy. 226.370-3 Section 226.370-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
48 CFR 26.303 - Data collection and reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Data collection and reporting requirements. 26.303 Section 26.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
48 CFR 26.303 - Data collection and reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Data collection and reporting requirements. 26.303 Section 26.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
48 CFR 26.303 - Data collection and reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Data collection and reporting requirements. 26.303 Section 26.303 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Policy. 226.370-3 Section 226.370-3 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS OTHER SOCIOECONOMIC PROGRAMS Historically Black Colleges and Universities...
48 CFR 19.301 - Representations and rerepresentations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Representations and rerepresentations. 19.301 Section 19.301 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Determination of Small Business Status for Small Business...
Will Empowerment of USAF Program Managers Mitigate the Acquisitions Crisis
2016-06-10
FAR Federal Acquisition Regulations GAO Government Accountability Office MDAP Major Defense Acquisition Program USAF United States Air Force ix...actually run the project. The Government Accountability Office (GAO),2 along with many other organizations, including Congress in their 2016 National...1 Government Accountability Office (GAO), GAO-06-110, Best Practices: Better Support of Weapons Systems Program Managers Needed to
Contracting with the Enemy: The Contracting Officer’s Dilemma
2015-06-01
Acquisition Research Program Graduate School of Business & Public Policy Naval Postgraduate School NPS-CM-15-133 ACQUISITION RESEARCH PROGRAM...Thesis Advisors: Dr. Max Kidalov, Assistant Professor E. Cory Yoder, Senior Lecturer Graduate School of Business & Public Policy Naval Postgraduate...Program Graduate School of Business & Public Policy Naval Postgraduate School The research presented in this report was supported by the Acquisition
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunn, K.; Bellamy, S.; Daugherty, W.
Nuclear material inventories are increasingly being transferred to interim storage locations where they may reside for extended periods of time. Use of a shipping package to store nuclear materials after the transfer has become more common for a variety of reasons. Shipping packages are robust and have a qualified pedigree for performance in normal operation and accident conditions but are only certified over an approved transportation window. The continued use of shipping packages to contain nuclear material during interim storage will result in reduced overall costs and reduced exposure to workers. However, the shipping package materials of construction must maintainmore » integrity as specified by the safety basis of the storage facility throughout the storage period, which is typically well beyond the certified transportation window. In many ways, the certification processes required for interim storage of nuclear materials in shipping packages is similar to life extension programs required for dry cask storage systems for commercial nuclear fuels. The storage of spent nuclear fuel in dry cask storage systems is federally-regulated, and over 1500 individual dry casks have been in successful service up to 20 years in the US. The uncertainty in final disposition will likely require extended storage of this fuel well beyond initial license periods and perhaps multiple re-licenses may be needed. Thus, both the shipping packages and the dry cask storage systems require materials integrity assessments and assurance of continued satisfactory materials performance over times not considered in the original evaluation processes. Test programs for the shipping packages have been established to obtain aging data on materials of construction to demonstrate continued system integrity. The collective data may be coupled with similar data for the dry cask storage systems and used to support extending the service life of shipping packages in both transportation and storage.« less
48 CFR 522.804 - Affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Affirmative action programs. 522.804 Section 522.804 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION... Affirmative action programs. ...
48 CFR 422.804 - Affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Affirmative action programs. 422.804 Section 422.804 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Affirmative action programs. ...
48 CFR 522.804 - Affirmative action programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Affirmative action programs. 522.804 Section 522.804 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION... Affirmative action programs. ...
48 CFR 422.804 - Affirmative action programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Affirmative action programs. 422.804 Section 422.804 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE... Affirmative action programs. ...
46 CFR 8.530 - Plan development and approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Plan development and approval. 8.530 Section 8.530 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC VESSEL INSPECTION ALTERNATIVES Streamlined Inspection Program § 8.530 Plan development and approval. The Company SIP Agent will...
46 CFR 8.530 - Plan development and approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Plan development and approval. 8.530 Section 8.530 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC VESSEL INSPECTION ALTERNATIVES Streamlined Inspection Program § 8.530 Plan development and approval. The Company SIP Agent will...
46 CFR 503.54 - Original classification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 9 2011-10-01 2011-10-01 false Original classification. 503.54 Section 503.54 Shipping... Program § 503.54 Original classification. (a) No Commission Member or employee has the authority to... require classification, or receives any foreign government information as defined in section 6.1(s) of...
46 CFR 503.54 - Original classification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 9 2010-10-01 2010-10-01 false Original classification. 503.54 Section 503.54 Shipping... Program § 503.54 Original classification. (a) No Commission Member or employee has the authority to... require classification, or receives any foreign government information as defined in section 1.1(d) of...
46 CFR 16.113 - Chemical drug testing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Chemical drug testing. 16.113 Section 16.113 Shipping... General § 16.113 Chemical drug testing. (a) Drug testing programs required by this part must be conducted... should be consulted to determine the specific procedures which must be established and utilized. Drug...
46 CFR 16.113 - Chemical drug testing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Chemical drug testing. 16.113 Section 16.113 Shipping... General § 16.113 Chemical drug testing. (a) Drug testing programs required by this part must be conducted... should be consulted to determine the specific procedures which must be established and utilized. Drug...
46 CFR 16.113 - Chemical drug testing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Chemical drug testing. 16.113 Section 16.113 Shipping... General § 16.113 Chemical drug testing. (a) Drug testing programs required by this part must be conducted... should be consulted to determine the specific procedures which must be established and utilized. Drug...
46 CFR 16.113 - Chemical drug testing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Chemical drug testing. 16.113 Section 16.113 Shipping... General § 16.113 Chemical drug testing. (a) Drug testing programs required by this part must be conducted... should be consulted to determine the specific procedures which must be established and utilized. Drug...
46 CFR 16.113 - Chemical drug testing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Chemical drug testing. 16.113 Section 16.113 Shipping... General § 16.113 Chemical drug testing. (a) Drug testing programs required by this part must be conducted... should be consulted to determine the specific procedures which must be established and utilized. Drug...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Definitions. 8.510 Section 8.510 Shipping COAST GUARD... Streamlined Inspection Program § 8.510 Definitions. The following definitions apply to this subpart: Civil..., Marine Inspection (OCMI), to assist in the development of an action plan. Company means the owner of the...
46 CFR 503.54 - Original classification.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 9 2012-10-01 2012-10-01 false Original classification. 503.54 Section 503.54 Shipping... Program § 503.54 Original classification. (a) No Commission Member or employee has the authority to... require classification, or receives any foreign government information as defined in section 6.1(s) of...
46 CFR 503.54 - Original classification.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 9 2013-10-01 2013-10-01 false Original classification. 503.54 Section 503.54 Shipping... Program § 503.54 Original classification. (a) No Commission Member or employee has the authority to... require classification, or receives any foreign government information as defined in section 6.1(s) of...
46 CFR 503.54 - Original classification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 9 2014-10-01 2014-10-01 false Original classification. 503.54 Section 503.54 Shipping... Program § 503.54 Original classification. (a) No Commission Member or employee has the authority to... require classification, or receives any foreign government information as defined in section 6.1(s) of...
DOT National Transportation Integrated Search
1978-09-01
The requirements for a navigation guidance system which will effect an increase in the ship processing capacity of the Saint Lawrence Seaway (Lake Ontario to Montreal, Quebec) are developed. The requirements include a specification of system position...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Definitions. 296.2 Section 296.2 Shipping MARITIME... SECURITY PROGRAM (MSP) Introduction § 296.2 Definitions. For the purposes of this part: Act means the... 121. This definition includes a trust. DOD means the U.S. Department of Defense. Domestic Trade means...
46 CFR 380.23 - Supervision of records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Supervision of records. 380.23 Section 380.23 Shipping... § 380.23 Supervision of records. (a) Contractors and others subject to the provisions of this subpart... shall be responsible for supervision of its document retention and disposal program. Immediately upon...
46 CFR 380.23 - Supervision of records.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Supervision of records. 380.23 Section 380.23 Shipping... § 380.23 Supervision of records. (a) Contractors and others subject to the provisions of this subpart... shall be responsible for supervision of its document retention and disposal program. Immediately upon...
46 CFR 380.23 - Supervision of records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Supervision of records. 380.23 Section 380.23 Shipping... § 380.23 Supervision of records. (a) Contractors and others subject to the provisions of this subpart... shall be responsible for supervision of its document retention and disposal program. Immediately upon...
46 CFR 380.23 - Supervision of records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Supervision of records. 380.23 Section 380.23 Shipping... § 380.23 Supervision of records. (a) Contractors and others subject to the provisions of this subpart... shall be responsible for supervision of its document retention and disposal program. Immediately upon...
46 CFR 380.23 - Supervision of records.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Supervision of records. 380.23 Section 380.23 Shipping... § 380.23 Supervision of records. (a) Contractors and others subject to the provisions of this subpart... shall be responsible for supervision of its document retention and disposal program. Immediately upon...
46 CFR 12.709 - Apprentice engineers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Apprentice engineers. 12.709 Section 12.709 Shipping... ENDORSEMENTS Entry-Level National Ratings and Miscellaneous Ratings § 12.709 Apprentice engineers. (a) Persons enrolled in an engineer training program approved by the Coast Guard, and who present a letter or other...
75 FR 79418 - Request for Certification of Compliance-Rural Industrialization Loan and Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... 4279-2) for the following: Applicant/Location: Mt. Vernon Seafoods, LLC, Burlington, Washington... ship; purchase equipment, materials and machinery; perform upgrades to factory processor and company owned ship; and to create working capital. The office is to be located in Burlington, Washington. The...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Application. 8.520 Section 8.520 Shipping COAST GUARD... Streamlined Inspection Program § 8.520 Application. To apply for SIP enrollment, a company will submit an application, in writing, to the cognizant OCMI. The application must contain the following: (a) A statement...
Flexibility in Early Stage Design of U. S. Navy Ships: An Analysis of Options
2011-01-01
Flexibility in Early Stage Design of US Navy Ships: An Analysis of Options by Jonathan Page B.S., Systems Engineering, US Naval Academy, 2002...8217C/ v = (;!;!: ;: Pat Hale Director, Systems Design and Ma~ement Fellows Program E~i_yfering.S~~pivi~i~ Acceptedby...2. REPORT TYPE 3. DATES COVERED 00-00-2012 to 00-00-2012 4. TITLE AND SUBTITLE Flexibility in Early Stage Design of U. S. Navy Ships: An
Defense Budget (1995): Potential Reductions and Rescissions in RDT&E and Procurement Programs
1994-09-08
million in fiscal year 1993 funding was to finance part of the fiscal year 1993 Ship Cost Adjustment in the Shipbuilding and Conversion account and (2...of fiscal year 1995. The Navy Comptroller plans to reprogram fiscal year 1993 funds of $14.632 million to the Ship Cost Adjustment account because...to help fund the fiscal year 1994 Ship Cost Adjustment in the Shipbuilding and Conversion account and the remaining $7.222 million was reprogrammed to
1989-09-01
RESPONSIBLE PERSON a. REPORT unclassified b. ABSTRACT unclassified c . THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18... Computer Aided Design (CAD) and Manufacturing (CAM) techniques in the marine industry has increased significantly in recent years, With more...somewhat from ship to ship. All of the activities and companies involved have improved this process by utilizing computer tools. For example, many
United States Naval Hospital Ship Program: History, Evolution, and Configuration Management.
1987-12-01
named the CARLOS CHAGAS and was built in Rio de Janeiro in 1984. The basic ship configuration characteristics are as follows: dimension, in ’ feet: 154.2...of 2,500 cubic feet. The ship’s medical missions include trips to countries in the Caribbean Basin and the Amazon River in Brazil . In contrast to...20 D;S’RIBUTION , AVAILABILITY OF ABSTRACT 2’ ABSTRACT SE RITY CASSIFICATION CXNCLASSIVIEDUNLMFi’ED - SAME AS RPT - Z)TIC USERS UNCL 22a NAME O
NASA Astrophysics Data System (ADS)
Vienhage, Paul; Barcomb, Heather; Marshall, Karel; Black, William A.; Coons, Amanda; Tran, Hien T.; Nguyen, Tien M.; Guillen, Andy T.; Yoh, James; Kizer, Justin; Rogers, Blake A.
2017-05-01
The paper describes the MATLAB (MathWorks) programs that were developed during the REU workshop1 to implement The Aerospace Corporation developed Unified Game-based Acquisition Framework and Advanced Game - based Mathematical Framework (UGAF-AGMF) and its associated War-Gaming Engine (WGE) models. Each game can be played from the perspectives of the Department of Defense Acquisition Authority (DAA) or of an individual contractor (KTR). The programs also implement Aerospace's optimum "Program and Technical Baseline (PTB) and associated acquisition" strategy that combines low Total Ownership Cost (TOC) with innovative designs while still meeting warfighter needs. The paper also describes the Bayesian Acquisition War-Gaming approach using Monte Carlo simulations, a numerical analysis technique to account for uncertainty in decision making, which simulate the PTB development and acquisition processes and will detail the procedure of the implementation and the interactions between the games.
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1604.7201 - FEHB Program Large Provider Agreements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false FEHB Program Large Provider Agreements. 1604.7201 Section 1604.7201 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Large...
48 CFR 1604.7201 - FEHB Program Large Provider Agreements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false FEHB Program Large Provider Agreements. 1604.7201 Section 1604.7201 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Large...
48 CFR 1604.7201 - FEHB Program Large Provider Agreements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false FEHB Program Large Provider Agreements. 1604.7201 Section 1604.7201 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Large...
48 CFR 1644.170 - Policy for FEHB Program subcontracting.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...
48 CFR 1604.7201 - FEHB Program Large Provider Agreements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false FEHB Program Large Provider Agreements. 1604.7201 Section 1604.7201 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Large...
76 FR 26220 - Federal Acquisition Regulation; Socioeconomic Program Parity
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-06
... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Federal Acquisition Regulation; Socioeconomic Program Parity AGENCY: Department of Defense (DoD), General... expectation exists (see 19.502-3 as to partial set-asides). Although past acquisition history of an item or...
44 CFR 80.17 - Project implementation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program PROPERTY ACQUISITION AND... encumbrances to the property must be extinguished before acquisition. (c) Purchase offer and supplemental... resulting in a National Flood Insurance Program (NFIP) claim of at least $5000. (2) For acquisition of...
48 CFR 19.602-4 - Awarding the contract.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Awarding the contract. 19.602-4 Section 19.602-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Certificates of Competency and Determinations of Responsibility...
Acquisition Systems Protection Planning the Manhatten Project: A Case Study
1994-06-03
This study examines the counterintelligence and security programs of the Manhattan Project , the United States acquisition of the atomic bomb, using...assessment methodology and counterintelligence techniques and procedures. Acquisition systems, Program protection, Manhattan Project , Atomic bomb, Technology protection, Counterintelligence, Security.
1994-06-03
wft*:¥A:ft:i:ft& OFFICE OF THE INSPECTOR GENERAL AV-8B REMANUFACTURE PROGRAM AS PART OF THE AUDIT OF THE DEFENSE ACQUISITION BOARD...Part of the Audit of the Defense Acquisition Board Review Process - FY 1994 B. DATE Report Downloaded From the Internet: 03/23/99 C. Report’s Point...NAVY FOR RESEARCH DEVELOPMENT AND ACQUISITION SUBJECT: Audit Report on the AV-8B Remanufacture Program as Part of the Audit of the Defense
48 CFR 922.804 - Affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... Affirmative action programs. ...
48 CFR 922.804 - Affirmative action programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Affirmative action programs. 922.804 Section 922.804 Federal Acquisition Regulations System DEPARTMENT OF ENERGY SOCIOECONOMIC... Affirmative action programs. ...
48 CFR 1522.804 - Affirmative action programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY....804 Affirmative action programs. ...
48 CFR 1522.804 - Affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Affirmative action programs. 1522.804 Section 1522.804 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY....804 Affirmative action programs. ...
Cookies for the Real World: Assessing the Potential of RFID for Contractor Monitoring
2006-05-30
Business Systems. Litoral Combat Ship (LCS) Civilian Aviation Alternative Support Study: Report of Findings and Recommendation. July 2006. NPS-AM-06...Review of the Framework from 1987-2003." BPP Research Colloquium. 25 November 2003. Copies of the Acquisition Sponsored Research Reports may be printed...mlpqdo^ar^qb=p`elli= Report Documentation Page Form ApprovedOMB No. 0704-0188 Public reporting burden for the collection of information is estimated
1981-03-01
58 H. CONTRACTING REQUIREM4ENTS----------------------- 5 I. 4G LIFE CYCLE USAGE---------------------------- 61 J. SUMMARY...procurement data is transferred during the life cycle of an item. The virtual revolution in electronics technology every five years is straining the abilities...naval operations throughout the systems/equipment life cycle [151. NAVELEX manages temporary parts inventories during the design and development of new
2013-07-01
composed of vice admirals from the requirements, acquisition, and fleet communities, and has the mission of ensuring “the successful procurement...development, manning, training, sustainment, and operational employment” of the LCS, mission packages, and shore 4The LCS block buy contracts include fixed...capabilities, limitations, and safety issues to help reduce design and programmatic risks. Operational testing is intended to assess a weapon system’s
48 CFR 1422.804 - Affirmative action programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR....804 Affirmative action programs. ...
48 CFR 1422.804 - Affirmative action programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Affirmative action programs. 1422.804 Section 1422.804 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR....804 Affirmative action programs. ...
NASA Astrophysics Data System (ADS)
Song, Young Joo; Woo, Jong Hun; Shin, Jong Gye
2009-12-01
Today, many middle-sized shipbuilding companies in Korea are experiencing strong competition from shipbuilding companies in other nations. This competition is particularly affecting small- and middle-sized shipyards, rather than the major shipyards that have their own support systems and development capabilities. The acquisition of techniques that would enable maximization of production efficiency and minimization of the gap between planning and execution would increase the competitiveness of small- and middle-sized Korean shipyards. In this paper, research on a simulation-based support system for ship production management, which can be applied to the shipbuilding processes of middle-sized shipbuilding companies, is presented. The simulation research includes layout optimization, load balancing, work stage operation planning, block logistics, and integrated material management. Each item is integrated into a network system with a value chain that includes all shipbuilding processes.
Defense Acquisitions: Assessments of Selected Weapon Programs
2012-03-01
knowledge-based practices. As a result , most of these programs will carry technology, design, and production risks into subsequent phases of the...acquisition process that could result in cost growth or schedule delays. GAO also assessed the implementation of selected acquisition reforms and found...knowledge-based practices. As a result , most of these programs will carry technology, design, and production risks into subsequent phases of the
Graphical user interface for image acquisition and processing
Goldberg, Kenneth A.
2002-01-01
An event-driven GUI-based image acquisition interface for the IDL programming environment designed for CCD camera control and image acquisition directly into the IDL environment where image manipulation and data analysis can be performed, and a toolbox of real-time analysis applications. Running the image acquisition hardware directly from IDL removes the necessity of first saving images in one program and then importing the data into IDL for analysis in a second step. Bringing the data directly into IDL creates an opportunity for the implementation of IDL image processing and display functions in real-time. program allows control over the available charge coupled device (CCD) detector parameters, data acquisition, file saving and loading, and image manipulation and processing, all from within IDL. The program is built using IDL's widget libraries to control the on-screen display and user interface.
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2825.302 Section 2825.302 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Balance of Payments Program 2825.302 Policy. The HCA, or designee at a level not lower than the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2825.302 Section 2825.302 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Balance of Payments Program 2825.302 Policy. The HCA, or designee at a level not lower than the...
Cost and Time Overruns for Major Defense Acquisition Programs: An Annotated Brief
2011-04-30
Logistics Management) • Director, Strategic Systems Programs Office • Deputy Director, Acquisition Career Management, US Army • Defense Business...acquisition and industrial base issues and their impact on the transatlantic defense market. Before joining CSIS, he worked as a freelance defense
2003-12-19
KENNEDY SPACE CENTER, FLA. -- NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) tours a solid rocket booster (SRB) retrieval ship at Cape Canaveral. NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
NASA Technical Reports Server (NTRS)
1962-01-01
The X-15 ship #3 (56-6672) is seen here on the lakebed at the Edwards Air Force Base, Edwards, California. Ship #3 made 65 flights during the program, attaining a top speed of Mach 5.65 and a maximum altitude of 354,200 feet. Only 10 of the 12 X-15 pilots flew Ship #3, and only eight of them earned their astronaut wings during the program. Robert White, Joseph Walker, Robert Rushworth, John 'Jack' McKay, Joseph Engle, William 'Pete' Knight, William Dana, and Michael Adams all earned their astronaut wings in Ship #3. Neil Armstrong and Milton Thompson also flew Ship #3. In fact, Armstrong piloted Ship #3 on its first flight, on 20 December 1961. On 15 November 1967, Ship #3 was launched over Delamar Lake, Nevada with Maj. Michael J. Adams at the controls. The vehicle soon reached a speed of Mach 5.2, and a peak altitude of 266,000 feet. During the climb, an electrical disturbance degraded the aircraft's controllability. Ship #3 began a slow drift in heading, which soon became a spin. Adams radioed that the X-15 'seems squirrelly,' and then said 'I'm in a spin.' Through some combination of pilot technique and basic aerodynamic stability, Adams recovered from the spin, and entered an inverted Mach 4.7 dive. As the X-15 plummeted into the increasingly thicker atmosphere, the Honeywell adaptive flight control system caused the vehicle to begin oscillating. As the pitching motion increased, aerodynamic forces finally broke the aircraft into several major pieces. Adams was killed when the forward fuselage impacted the desert. This was the only fatal accident during the entire X-15 program. The X-15 was a rocket powered aircraft 50 ft long with a wingspan of 22 ft. It was a missile-shaped vehicle with an unusual wedge-shaped vertical tail, thin stubby wings, and unique side fairings that extended along the side of the fuselage. The X-15 weighed about 14,000 lb empty and approximately 34,000 lb at launch. The XLR-99 rocket engine, manufactured by Thiokol Chemical Corp., was pilot controlled and was capable of developing 57,000 lb of thrust. North American Aviation built three X-15 aircraft for the program. The X-15 research aircraft was developed to provide in-flight information and data on aerodynamics, structures, flight controls, and the physiological aspects of high-speed, high-altitude flight. A follow-on program used the aircraft as a testbed to carry various scientific experiments beyond the Earth's atmosphere on a repeated basis. For flight in the dense air of the usable atmosphere, the X-15 used conventional aerodynamic controls such as rudder surfaces on the vertical stabilizers to control yaw and movable horizontal stabilizers to control pitch when moving in synchronization or roll when moved differentially. For flight in the thin air outside of the appreciable Earth's atmosphere, the X-15 used a reaction control system. Hydrogen peroxide thrust rockets located on the nose of the aircraft provided pitch and yaw control. Those on the wings provided roll control. Because of the large fuel consumption, the X-15 was air launched from a B-52 aircraft at 45,000 ft and a speed of about 500 mph. Depending on the mission, the rocket engine provided thrust for the first 80 to 120 sec of flight. The remainder of the normal 10 to 11 min. flight was powerless and ended with a 200-mph glide landing. Generally, one of two types of X-15 flight profiles was used; a high-altitude flight plan that called for the pilot to maintain a steep rate of climb, or a speed profile that called for the pilot to push over and maintain a level altitude. The X-15 was flown over a period of nearly 10 years -- June 1959 to Oct. 1968 -- and set the world's unofficial speed and altitude records of 4,520 mph or Mach 6.7 (set by Ship #2) and 354,200 ft (set by Ship #3) in a program to investigate all aspects of manned hypersonic flight. Information gained from the highly successful X-15 program contributed to the development of the Mercury, Gemini,and Apollo manned spaceflight programs, and also the Space Shuttle program. The X-15s made a total of 199 flights, and were manufactured by North American Aviation. X-15-1, serial number 56-6670, is now located at the National Air and Space Museum, Washington DC. North American X-15A-2, serial number 56-6671, is at the United States Air Force Museum, Wright-Patterson AFB, Ohio. Parts of the crashed X-15-3, serial number 56-6672, recovered in 1992 by Peter Merlin and Tony Moore (The X-Hunters) are on display at the Air Force Flight Test Center Museum at Edwards. The canopy from Ship #3, recovered during the original search in 1967, is displayed at the San Diego Aerospace Museum, San Diego, California.
Gordon, John D.; Latysh, Natalie E.; Lindholm, Sandy J.
2003-01-01
Five external quality-assurance programs were operated by the U.S. Geological Survey for the National Atmospheric Deposition Program/ National Trends Network (NADP/NTN) during 1997 through 1999: the intersite-comparison program, the blind-audit program, the field- audit program, the interlaboratory-comparison program, and the collocated-sampler program. The intersite-comparison program assesses the accuracy of pH and specific-conductance determinations made by NADP/NTN site operators. In two 1997 intersite-comparison studies, 83.7 and 85.8 percent of the pH determinations met the NADP/NTN accuracy goals, whereas 97.3 and 92.4 percent of the specific-conductance determinations met the NADP/NTN accuracy goals. The percentage of pH and specific-conductance determinations that met the accuracy goals in 1998 were, for the most part, higher than in 1997. In two 1998 studies, 90.9 and 90.3 percent of the pH determinations met the accuracy goals compared to 94.7 and 96.0 percent of the specific- conductance measurements meeting the accuracy goals. In one 1999 intersite-comparison study, 89.5 percent and 99.4 percent of pH and specific- conductance determinations, respectively, met the NADP/NTN accuracy goals. The blind-audit program evaluates the effects of routine sample handling, processing, and shipping on the analytical bias and precision of weekly precipitation samples. A portion of the blind-audit sample subject to the normal onsite handling and processing of a weekly precipitation sample is referred to as the bucket portion, whereas the portion receiving only minimal handling is referred to as the bottle portion. Positive bias in regard to blind-audit results indicates that the bucket portion has a higher concentration than the bottle portion. The paired t-test for the 1997 through 1999 blind- audit data indicates that routine sample handling, processing, and shipping introduced a positive bias (a=0.05) for calcium and chloride and a negative bias (cz=0.05) for hydrogen ion. During 1997 through 1999, the median paired differences between the bucket and bottle portions ranged from 0.00 milligram per liter for nitrate and ammonium to +0.010 milligram per liter for both chloride and sulfate. The median paired difference between the bucket and bottle portions for hydrogen ion was -1.086 microequivalents per liter, whereas for specific conductance, the median paired difference between the bucket and bottle portions was -0.200 microsiemen per centimeter during 1997 through 1999. Surface-chemistry effects due to variable amounts of precipitation contacting prewashed sample-collection and shipping-container surfaces were studied in the blind-audit program by using three different sample volumes. The sample- collection and shipping containers used for the blind-audit study were obtained from the site operator's supply and could have been used for precipitation samples. Results of a Kruskal-Wallis analysis of variance test of the relation between paired blind-audit sample differences in units of concentration and sample volume were statistically significant for magnesium, chloride, sulfate, and hydrogen ion during 1997 through 1999. Before 1994, at least 5 of the 10 analytes displayed a statistically significant difference between paired blind-audit differences in units of concentration and sample volume, supporting the premise that chemical reactions between the 13-liter bucket shipping container (primarily the butadiene o-ring lid of the shipping container) and the sample, which resulted in an increasing loss of hydrogen ion with increasing volume, have been eliminated by the new l-liter bottle sample- shipping protocol. The field-audit program measures the effects of field exposure, handling, and processing on the chemistry of NADP/NTN precipitation samples. In the field-audit program, the site operator is instructed to process and submit a quality- control sample following a standard 7-day, Tuesday-to-Tuesday sampling period with no
48 CFR 1219.1005 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Applicability. 1219.1005 Section 1219.1005 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program 1219.1005...
48 CFR 19.504 - Inclusion of Federal Prison Industries, Inc.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Inclusion of Federal Prison Industries, Inc. 19.504 Section 19.504 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.504 Inclusion of...
48 CFR 19.504 - Inclusion of Federal Prison Industries, Inc.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Inclusion of Federal Prison Industries, Inc. 19.504 Section 19.504 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.504 Inclusion of...
48 CFR 19.504 - Inclusion of Federal Prison Industries, Inc.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Inclusion of Federal Prison Industries, Inc. 19.504 Section 19.504 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.504 Inclusion of...
48 CFR 19.504 - Inclusion of Federal Prison Industries, Inc.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Inclusion of Federal Prison Industries, Inc. 19.504 Section 19.504 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.504 Inclusion of...
48 CFR 19.504 - Inclusion of Federal Prison Industries, Inc.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Inclusion of Federal Prison Industries, Inc. 19.504 Section 19.504 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Set-Asides for Small Business 19.504 Inclusion of...
48 CFR 19.705-1 - General support of the program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false General support of the program. 19.705-1 Section 19.705-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... any contractual incentive provision based upon rewarding the contractor monetarily for exceeding goals...
Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules
2015-06-01
additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of
Weapon Acquisition Program Outcomes and Efforts to Reform DOD’s Acquisition Process
2016-05-09
portfolio’s total estimated acquisition cost. 11. The equity prices of contractors delivering the ten costliest programs performed well relative to broad...cost growth. • In a constrained funding environment, unforeseen cost increases limit investment choices. The equity prices of the contractors ...remain profitable well into the future • Five publicly-traded defense contractors are developing and delivering the ten largest DOD programs in the 2015
A methodology for calibration of hyperspectral and multispectral satellite data in coastal areas
NASA Astrophysics Data System (ADS)
Pennucci, Giuliana; Fargion, Giulietta; Alvarez, Alberto; Trees, Charles; Arnone, Robert
2012-06-01
The objective of this work is to determine the location(s) in any given oceanic area during different temporal periods where in situ sampling for Calibration/Validation (Cal/Val) provides the best capability to retrieve accurate radiometric and derived product data (lowest uncertainties). We present a method to merge satellite imagery with in situ measurements, to determine the best in situ sampling strategy suitable for satellite Cal/Val and to evaluate the present in situ locations through uncertainty indices. This analysis is required to determine if the present in situ sites are adequate for assessing uncertainty and where additional sites and ship programs should be located to improve Calibration/Validation (Cal/Val) procedures. Our methodology uses satellite acquisitions to build a covariance matrix encoding the spatial-temporal variability of the area of interest. The covariance matrix is used in a Bayesian framework to merge satellite and in situ data providing a product with lower uncertainty. The best in situ location for Cal/Val is then identified by using a design principle (A-optimum design) that looks for minimizing the estimated variance of the merged products. Satellite products investigated in this study include Ocean Color water leaving radiance, chlorophyll, and inherent and apparent optical properties (retrieved from MODIS and VIIRS). In situ measurements are obtained from systems operated on fixed deployment platforms (e.g., sites of the Ocean Color component of the AErosol RObotic NETwork- AERONET-OC), moorings (e.g, Marine Optical Buoy-MOBY), ships or autonomous vehicles (such as Autonomous Underwater Vehicles and/or Gliders).
46 CFR 507.149 - Program accessibility: Discrimination prohibited.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 9 2012-10-01 2012-10-01 false Program accessibility: Discrimination prohibited. 507... MARITIME COMMISSION § 507.149 Program accessibility: Discrimination prohibited. Except as otherwise... in, or otherwise be subjected to discrimination under any program or activity conducted by the agency. ...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Tank vessels. 296.20 Section 296.20 Shipping MARITIME... SECURITY PROGRAM (MSP) Priority for Granting Applications § 296.20 Tank vessels. (a) First priority for the award of MSP Operating Agreements under MSA 2003 shall be granted to a tank vessel that is constructed...
46 CFR 10.412 - Distance and e-learning.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Distance and e-learning. 10.412 Section 10.412 Shipping... CREDENTIAL Training Courses and Programs § 10.412 Distance and e-learning. The Coast Guard may allow the training of mariners by means of distance learning and e-learning in accordance with the standards of...
46 CFR 12.25-35 - Apprentice engineers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Apprentice engineers. 12.25-35 Section 12.25-35 Shipping... Department § 12.25-35 Apprentice engineers. (a) Persons enrolled in an apprentice engineer training program... evidence that they are so enrolled may be issued an endorsement as apprentice engineer and may be signed on...
46 CFR 12.25-35 - Apprentice engineers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Apprentice engineers. 12.25-35 Section 12.25-35 Shipping... Department § 12.25-35 Apprentice engineers. (a) Persons enrolled in an apprentice engineer training program... evidence that they are so enrolled may be issued an endorsement as apprentice engineer and may be signed on...
46 CFR 12.25-35 - Apprentice engineers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Apprentice engineers. 12.25-35 Section 12.25-35 Shipping... Department § 12.25-35 Apprentice engineers. (a) Persons enrolled in an apprentice engineer training program... evidence that they are so enrolled may be issued an endorsement as apprentice engineer and may be signed on...
46 CFR 12.25-35 - Apprentice engineers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Apprentice engineers. 12.25-35 Section 12.25-35 Shipping... Department § 12.25-35 Apprentice engineers. (a) Persons enrolled in an apprentice engineer training program... evidence that they are so enrolled may be issued an endorsement as apprentice engineer and may be signed on...
Regulation of myeloproliferation and M2 macrophage programming in mice by Lyn/Hck, SHIP, and Stat5
Xiao, Wenbin; Hong, Hong; Kawakami, Yuko; Lowell, Clifford A.; Kawakami, Toshiaki
2008-01-01
The proliferation and differentiation of hematopoietic stem cells (HSCs) is finely regulated by extrinsic and intrinsic factors via various signaling pathways. Here we have shown that, similar to mice deficient in the lipid phosphatase SHIP, loss of 2 Src family kinases, Lyn and Hck, profoundly affects HSC differentiation, producing hematopoietic progenitors with increased proliferation, reduced apoptosis, growth factor–independent survival, and skewed differentiation toward M2 macrophages. This phenotype culminates in a Stat5-dependent myeloproliferative disease that is accompanied by M2 macrophage infiltration of the lung. Expression of a membrane-bound form of SHIP in HSCs lacking both Lyn and Hck restored normal hematopoiesis and prevented myeloproliferation. In vitro and in vivo studies suggested the involvement of autocrine and/or paracrine production of IL-3 and GM-CSF in the increased proliferation and myeloid differentiation of HSCs. Thus, this study has defined a myeloproliferative transformation-sensitive signaling pathway, composed of Lyn/Hck, SHIP, autocrine/paracrine cytokines, and Stat5, that regulates HSC differentiation and M2 macrophage programming. PMID:18246197
NASA Astrophysics Data System (ADS)
Zhang, Bao-Ji; Zhang, Zhu-Xin
2015-09-01
To obtain low resistance and high efficiency energy-saving ship, minimum total resistance hull form design method is studied based on potential flow theory of wave-making resistance and considering the effects of tail viscous separation. With the sum of wave resistance and viscous resistance as objective functions and the parameters of B-Spline function as design variables, mathematical models are built using Nonlinear Programming Method (NLP) ensuring the basic limit of displacement and considering rear viscous separation. We develop ship lines optimization procedures with intellectual property rights. Series60 is used as parent ship in optimization design to obtain improved ship (Series60-1) theoretically. Then drag tests for the improved ship (Series60-1) is made to get the actual minimum total resistance hull form.
Leveraging Available Data to Support Extension of Transportation Packages Service Life
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunn, K.; Abramczyk, G.; Bellamy, S.
Data obtained from testing shipping package materials have been leveraged to support extending the service life of select shipping packages while in nuclear materials transportation. Increasingly, nuclear material inventories are being transferred to an interim storage location where they will reside for extended periods of time. Use of a shipping package to store nuclear materials in an interim storage location has become more attractive for a variety of reasons. Shipping packages are robust and have a qualified pedigree for their performance in normal operation and accident conditions within the approved shipment period and storing nuclear material within a shipping packagemore » results in reduced operations for the storage facility. However, the shipping package materials of construction must maintain a level of integrity as specified by the safety basis of the storage facility through the duration of the storage period, which is typically well beyond the one year transportation window. Test programs have been established to obtain aging data on materials of construction that are the most sensitive/susceptible to aging in certain shipping package designs. The collective data are being used to support extending the service life of shipping packages in both transportation and storage.« less
KC-46 Tanker Aircraft: Program Generally Stable but Improvements in Managing Schedule Are Needed
2013-02-27
testing, and supplier management. An important contractual requirement (and best practice ) is for Boeing to release 90 percent of the total engineering...design is stable, and manufacturing processes are mature. As we reported last year, while the program has implemented many acquisition best practices ...assessed the program’s acquisition plan to determine compliance with acquisition legislation and acquisition best practices . What GAO Recommends GAO
Research Opportunities on board Virgin Galactic's SpaceShipTwo
NASA Astrophysics Data System (ADS)
Attenborough, S.; Pomerantz, W.; Stephens, K.
2013-09-01
Virgin Galactic is building the world's first commercial spaceline. Our suborbital spaceflight system, pictured in Figure 1, consists of two vehicles: WhiteKnightTwo (WK2) and SpaceShipTwo (SS2). WhiteKnightTwo is a four-engine, dual-fuselage jet aircraft capable of high-altitude heavy lift missions, including, but not limited to fulfilling its role as a mothership for SpaceShipTwo, an air-launched, suborbital spaceplane capable of routinely reaching an apogee up to 110 kilometers. In conjunction, these two vehicles allow access to space and to regions of the atmosphere ranging from the troposphere to the thermosphere; additionally, they provide extended periods of microgravity in a reliable and affordable way. SpaceShipTwo, with a payload capacity of up to 1,300 lbs. (~600 kg), features payload mounting interfaces that are compatible with standard architectures such as NASA Space Shuttle Middeck Lockers, Cargo Transfer Bags, and server racks, in addition to custom structures. With the standard interface, payloads are allowed access to the large 17 inch diameter cabin windows for external observations. Each dedicated research flight will be accompanied by a Virgin Galactic Flight Test Engineer, providing an opportunity for limited in-flight interaction. In addition, tended payloads - a flight that includes the researcher and his or her payload - are also an option. At a price point that is highly competitive with parabolic aircraft and sounding rockets and significantly cheaper than orbital flights, SpaceShipTwo is a unique platform that can provide frequent and repeatable research opportunities. Suborbital flights on SpaceShipTwo offer researchers several minutes of microgravity time and views of the external environment in the upper atmosphere and in outer space. In addition to serving as an important research platform in and of itself, SpaceShipTwo also offers researchers a means to test, iterate, and calibrate experiments designed for orbital platforms, including the International Space Station as well as LauncherOne, Virgin Galactic's dedicated launch vehicle for small (~500 lbs. / ~225 kg) satellites. Flights on SpaceShipTwo can be booked directly through Virgin Galactic. Various funding sources may be available for the research, including through NASA programs such as the Flight Opportunities Program, Game Changing Development Program, or Research Opportunities in Space and Earth Science (ROSES). More information about the SpaceShipTwo research platform, including a detailed Payload User's Guide, can be found at our website: http://www.virgingalactic.com/research.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Purpose. 1219.1003 Section 1219.1003 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Small Business Competitiveness Demonstration Program 1219.1003 Purpose. (b...