Proceedings of the Space Shuttle Sortie Workshop. Volume 1: Policy and system characteristics
NASA Technical Reports Server (NTRS)
1972-01-01
The workshop held to definitize the utilization of the space shuttle is reported, and the objectives of the workshop are listed. The policy papers are presented along with concepts of the space shuttle program, and the sortie workshop.
Earth resources survey applications of the space shuttle sortie mode
NASA Technical Reports Server (NTRS)
Sharma, R. D.; Smith, W. L.; Thomson, F. J.
1973-01-01
The use of the shuttle sortie mode for earth observation applications was investigated and its feasibility for applied research and instrument development was appraised. The results indicate that the shuttle sortie missions offer unique advantages and that specific aspects of earth applications are particularly suited to the sortie mode.
Guntersville Workshop on Solar-Terrestrial Studies
NASA Technical Reports Server (NTRS)
1977-01-01
The separation of purely solar physics from magnetospheric physics, and the effects of solar activity on geomagnetic activity are investigations which can be accomplished using the shuttle orbiter in an extended sortie mode, or an unmanned solar terrestrial observatory powered by the power module in an extended duration mode. When the power module is used with the shuttle in a sortie support mode, both the instrument capacity and the time in orbit of the orbiter can be increased several fold. In the free-flyer mode, the power module would be capable of providing power, basic attitude control, basic thermal control and housekeeping communications for unmanned, large, independent mission payloads in low earth orbit for periods of 6 months or longer. Instrument requirements for interdisciplinary joint observational programs are discussed for studies of the magnetosphere, the atmosphere, sun-weather relationships. Description summary charts of the power module are included.
Shuttle sortie simulation using a Lear jet aircraft: Mission no. 1 (assess program)
NASA Technical Reports Server (NTRS)
Mulholland, D. R.; Reller, J. O., Jr.; Nell, C. B., Jr.; Mason, R. H.
1972-01-01
The shuttle sortie simulation mission of the Airborne Science/Shuttle Experiments System Simulation Program which was conducted using the CV-990 aircraft is reported. The seven flight, five day mission obtained data on experiment preparation, type of experiment components, operation and maintenance, data acquisition, crew functions, timelines and interfaces, use of support equipment and spare parts, power consumption, work cycles, influence of constraints, and schedule impacts. This report describes the experiment, the facilities, the operation, and the results analyzed from the standpoint of their possible use in aiding the planning for experiments in the Shuttle Sortie Laboratory.
Proceedings of the Space Shuttle Sortie Workshop. Volume 2: Working group reports
NASA Technical Reports Server (NTRS)
1972-01-01
Details are presented on the mission planning progress in each of the working paper reports. The general topics covered are the following: space technology; materials processing and space manufacturing; communications and navigation; earth and ocean physics; oceanography; earth resources and surface environmental quality; meteorology and atmospheric environmental quality; life sciences; atmospheric and space physics; solar physics; high energy cosmic rays; X-ray and gamma ray astronomy; ultraviolet-optical astronomy; planetary astronomy; and infrared astronomy.
Mission analyses for manned flight experiments
NASA Technical Reports Server (NTRS)
Orth, J. E.
1973-01-01
The investigations to develop a high altitude aircraft program plan are reported along with an analysis of manned comet and asteroid missions, the development of shuttle sortie mission objectives, and an analysis of major management issues facing the shuttle sortie.
Use of shuttle for life sciences
NASA Technical Reports Server (NTRS)
Mcgaughy, R. E.
1972-01-01
The use of the space shuttle in carrying out biological and medical research programs, with emphasis on the sortie module, is examined. Detailed descriptions are given of the goals of space life science disciplines, how the sortie can meet these goals, and what shuttle design features are necessary for a viable biological and medical experiment program. Conclusions show that the space shuttle sortie module is capable of accommodating all biological experiments contemplated at this time except for those involving large specimens or large populations of small animals; however, these experiments can be done with a specially designed module. It was also found that at least two weeks is required to do a meaningful survey of biological effects.
NASA Technical Reports Server (NTRS)
1976-01-01
The preliminary analysis of strawman earth-viewing shuttle sortie payloads begun with the partial spacelab payload was analyzed. The payloads analyzed represent the two extremes of shuttle sortie application payloads: a full shuttle sortie payload dedicated to earth-viewing applications, and a small structure payload which can fly on a space available basis with another primary shuttle payload such as a free flying satellite. The intent of the dedicated mission analysis was to configure an ambitious, but feasible, payload; which, while rich in scientific return, would also stress the system and reveal any deficiences or problem areas in mission planning, support equipment, and operations. Conversely, the intent of the small structure payload was to demonstrate the ease with which a small, simple, flexible payload can be accommodated on shuttle flights.
Study of airborne science experiment management concepts for application to space shuttle, volume 2
NASA Technical Reports Server (NTRS)
Mulholland, D. R.; Reller, J. O., Jr.; Neel, C. B.; Haughney, L. C.
1973-01-01
Airborne research management and shuttle sortie planning at the Ames Research Center are reported. Topics discussed include: basic criteria and procedures for the formulation and approval of airborne missions; ASO management structure and procedures; experiment design, development, and testing aircraft characteristics and experiment interfaces; information handling for airborne science missions; mission documentation requirements; and airborne science methods and shuttle sortie planning.
NASA Technical Reports Server (NTRS)
1974-01-01
The potential of the space shuttle as a platform for captive earth resources payloads in the sortie mode, and as a launch and services vehicle for automated earth resources spacecraft is examined. The capabilities of the total space transportation system which are pertinent to earth resources sorties and automated spacecraft are included.
NASA Technical Reports Server (NTRS)
Alverado, U.
1975-01-01
The use of the space shuttle for the Earth Resources Program is discussed. Several problems with respect to payload selection, integration, and mission planning were studied. Each of four shuttle roles in the sortie mode were examined and projected into an integrated shuttle program. Several representative Earth Resources missions were designed which would use the shuttle sortie as a platform and collectively include the four shuttle roles. An integrated flight program based on these missions was then developed for the first two years of shuttle flights. A set of broad implications concerning the uses of the shuttle for Earth Resources studies resulted.
NASA Technical Reports Server (NTRS)
Sayers, R. S.
1972-01-01
An information management system is proposed for use in the space shuttle sortie, the modular space station, the tracking data relay satellite and associated ground support systems. Several different information management functions, including data acquisition, transfer, storage, processing, control and display are integrated in the system.
Modular space station phase B extension preliminary system design. Volume 7: Ancillary studies
NASA Technical Reports Server (NTRS)
Jones, A. L.
1972-01-01
Sortie mission analysis and reduced payloads size impact studies are presented. In the sortie mission analysis, a modular space station oriented experiment program to be flown by the space shuttle during the period prior to space station IOC is discussed. Experiments are grouped into experiment packages. Mission payloads are derived by grouping experiment packages and by adding support subsystems and structure. The operational and subsystems analyses of these payloads are described. Requirements, concepts, and shuttle interfaces are integrated. The sortie module/station module commonality and a sortie laboratory concept are described. In the payloads size analysis, the effect on the modular space station concept of reduced diameter and reduced length of the shuttle cargo bay is discussed. Design concepts are presented for reduced sizes of 12 by 60 ft, 14 by 40 ft, and 12 by 40 ft. Comparisons of these concepts with the modular station (14 by 60 ft) are made to show the impact of payload size changes.
Shuttle Orbital Applications and Requirements, supplementary tasks (SOAR-IIS)
NASA Technical Reports Server (NTRS)
1973-01-01
Representative shuttle mission applications were studied. The interfaces analyses, and specific payloads are reported for the following types of missions: shuttle delivered automated spacecraft, shuttle/tug delivered spacecraft, man-tended automated spacecraft, and sortie missions.
Shuttle sortie electro-optical instruments study
NASA Technical Reports Server (NTRS)
1974-01-01
A study to determine the feasibility of adapting existing electro-optical instruments (designed and sucessfully used for ground operations) for use on a shuttle sortie flight and to perform satisfactorily in the space environment is considered. The suitability of these two instruments (a custom made image intensifier camera system and an off-the-shelf secondary electron conduction television camera) to support a barium ion cloud experiment was studied for two different modes of spacelab operation - within the pressurized module and on the pallet.
NASA Technical Reports Server (NTRS)
Goodwin, F. E.; Nussmeier, T. A.; Stokes, L. S.; Vourgourakis, E. J.
1976-01-01
The following topics were reviewed: (1) design options for shuttle terminal, (2) elliptical orbit satellite design options, (3) shuttle terminal details, (4) technology status and development requirements, (5) transmitter technology, and (6) carbon dioxide laser life studies.
Parametric evaluation of the cost effectiveness of Shuttle payload vibroacoustic test plans
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.; Keegan, W. B.; Young, J. P.
1978-01-01
Consideration is given to alternate vibroacoustic test plans for sortie and free flyer Shuttle payloads. Statistical decision models for nine test plans provide a viable method of evaluating the cost effectiveness of alternate vibroacoustic test plans and the associated test levels. The methodology is a major step toward the development of a useful tool for the quantitative tailoring of vibroacoustic test programs to sortie and free flyer payloads. A broader application of the methodology is now possible by the use of the OCTAVE computer code.
Astronomy sortie missions definition study. Volume 3, book 1: Design analysis and trade studies
NASA Technical Reports Server (NTRS)
1972-01-01
A study to define the astronomy sortie missions was conducted. The design analyses and tradeoff studies conducted for candidate concepts are presented. The subjects discussed are: (1) system and subsystem requirements, (2) space shuttle interfaces, (3) infrared telescope development, and (4) experiments to be conducted during the mission.
NASA Technical Reports Server (NTRS)
1972-01-01
Backup or supporting data for the design analyses and trade studies which defined the astronomy sortie missions are presented. The subjects discussed are: (1) configuration of space shuttle orbiter, (2) electronic subsystems, (3) electric power requirements, and (4) payload requirements. Mathematical models are developed to illustrate the orbital rendezvous capabilities.
NASA Technical Reports Server (NTRS)
Shiokari, T.
1973-01-01
Payloads to be launched on the space shuttle/space tug/sortie lab combinations are discussed. The payloads are of four types: (1) expendable, (2) ground refurbishable, (3) on-orbit maintainable, and (4) sortie. Economic comparisons are limited to the four types of payloads described. Additional system guidelines were developed by analyzing two payloads parameterically and demonstrating the results on an example satellite. In addition to analyzing the selected guidelines, emphasis was placed on providing economic tradeoff data and identifying payload parameters influencing the low cost approaches.
Life science payload definition and integration study, task C and D. Volume 3: Appendices
NASA Technical Reports Server (NTRS)
1973-01-01
Research equipment requirements were based on the Mini-7 and Mini-30 laboratory concepts defined in Tasks A and B of the intial LSPD contract. Modified versions of these laboratories and the research equipment within them were to be used in three missions of Shuttle/Sortie Module. These were designated (1) the shared 7-day laboratory (a mission with the life sciences laboratory sharing the sortie module with another scientific laboratory), (2) the dedicated 7-day laboratory (full use of the sortie module), and (3) the dedicated 30-day laboratory (full sortie module use with a 30-day mission duration). In defining the research equipment requirements of these laboratories, the equipment was grouped according to its function, and equipment unit data packages were prepared.
NASA Technical Reports Server (NTRS)
1972-01-01
Detailed and supporting analyses are presented of the hazardous payloads, docking, and on-board survivability aspects connected with earth orbital operations of the space shuttle program. The hazards resulting from delivery, deployment, and retrieval of hazardous payloads, and from handling and transport of cargo between orbiter, sortie modules, and space station are identified and analyzed. The safety aspects of shuttle orbiter to modular space station docking includes docking for assembly of space station, normal resupply docking, and emergency docking. Personnel traffic patterns, escape routes, and on-board survivability are analyzed for orbiter with crew and passenger, sortie modules, and modular space station, under normal, emergency, and EVA and IVA operations.
NASA Technical Reports Server (NTRS)
Stahle, C. V.; Gongloff, H. R.
1977-01-01
A preliminary assessment of vibroacoustic test plan optimization for free flyer STS payloads is presented and the effects on alternate test plans for Spacelab sortie payloads number of missions are also examined. The component vibration failure probability and the number of components in the housekeeping subassemblies are provided. Decision models are used to evaluate the cost effectiveness of seven alternate test plans using protoflight hardware.
NASA Technical Reports Server (NTRS)
1972-01-01
Safety requirements and guidelines are listed for the sortie module, upper stage vehicle, and space station for the earth orbit operations of the space shuttle program. The requirements and guidelines are for vehicle design, safety devices, warning devices, operational procedures, and residual hazards.
NASA Technical Reports Server (NTRS)
Marks, D. A.; Gendiellee, R. E.; Kelly, T. M.; Giovannello, M. A.
1974-01-01
Ground processing and operation activities for selected automated and sortie payloads are evaluated. Functional flow activities are expanded to identify payload launch site facility and support requirements. Payload definitions are analyzed from the launch site ground processing viewpoint and then processed through the expanded functional flow activities. The requirements generated from the evaluation are compared with those contained in the data sheets. The following payloads were included in the evaluation: Long Duration Exposure Facility; Life Sciences Shuttle Laboratory; Biomedical Experiments Scientific Satellite; Dedicated Solar Sortie Mission; Magnetic Spectrometer; and Mariner Jupiter Orbiter. The expanded functional flow activities and descriptions for the automated and sortie payloads at the launch site are presented.
Reference earth orbital research and applications investigations (blue book). Volume 1: Summary
NASA Technical Reports Server (NTRS)
1971-01-01
The criteria, guidelines, and an organized approach for use in the space station and space shuttle program definition phase are presented. Subjects discussed are: (1) background information and evolution of the studies, (2) definition of terms used, (3) concepts of the space shuttle, space station, experiment modules, shuttle-sortie operations and modular space station, and (4) summary of functional program element (FPE) requirements. Diagrams of the various configurations and the experimental equipment to be installed in the structures are included.
Feasibility study of common electronic equipment for shuttle sortie experiment payloads
NASA Technical Reports Server (NTRS)
1974-01-01
A study was conducted to determine the feasibility of using standardized electronic equipment on the space shuttle vehicle in an effort to reduce the cost estimates. The standards for Nuclear Instrument Modules (NIM) and CAMAC electronic equipment are presented and described. It was determined that the CAMAC electronic equipment was more suitable for use with the space shuttle systems. Specific applications of the CAMAC equipment are analyzed. Illustrations of the equipment and circuit diagrams of the subsystems are provided.
NASA Technical Reports Server (NTRS)
1974-01-01
A space shuttle sortie mission which can be performed inexpensively in the early shuttle era and which, if the necessary intermediate steps are accomplished provides a major technological advance for the user organization-the U.S. Bureau of Census is described. The orbital configuration created for the Urban Land Use/1980 Census mission is illustrated including sensors and ground support equipment along with the information flow for the mission. Factors discussed include: specific Census Bureau functions to be supported by the mission; hardware and flight operations necessary for implementation of the mission; and integration of the TERSSE pallet into a shuttle mission.
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
Sensor development in the Shuttle era. [infrared temperature sounders and microwave radiometers
NASA Technical Reports Server (NTRS)
Gerding, R. B.; Mantarakis, P. Z.; Webber, D. S.
1975-01-01
The use of the Space Shuttle in the development of earth observation sensors is examined. Two sensor classes are selected for case histories: infrared temperature sounders and microwave radiometers. The most significant finding in each of the developmental studies of these two sensor classes is considered to be the feasibility and value of using the Shuttle/Spacelab as a test vehicle for the operation in space of a versatile multimode experimental sensor. The Shuttle Electrically Scanned Microwave Radiometer and the Shuttle Infrared Interferometer are found to be the most effective instruments in this context. The Shuttle/Spacelab Sortie mission characteristics provide opportunities for new approaches to the development of sensors, using the Shuttle as a test vehicle to improve the efficiency of the process with respect to time, cost, and/or quality of the final product. As for crew functions, the short-term Spacelab mission requires some near real-time evaluation of data quality and sensor function in order to insure efficient data collection.
1971-01-01
This is an artist's concept of the Research and Applications Modules (RAM). Evolutionary growth was an important consideration in space station plarning, and another project was undertaken in 1971 to facilitate such growth. The RAM study, conducted through a Marshall Space Flight Center contract with General Dynamics Convair Aerospace, resulted in the conceptualization of a series of RAM payload carrier-sortie laboratories, pallets, free-flyers, and payload and support modules. The study considered two basic manned systems. The first would use RAM hardware for sortie mission, where laboratories were carried into space and remained attached to the Shuttle for operational periods up to 7 days. The second envisioned a modular space station capability that could be evolved by mating RAM modules to the space station core configuration. The RAM hardware was to be built by Europeans, thus fostering international participation in the space program.
Some significant considerations in the planning of sortie missions. [of space transportation system
NASA Technical Reports Server (NTRS)
Loftus, J. P., Jr.; Cour-Palais, B. G.; Moore, J. W.; Lohman, R. L.
1980-01-01
Opportunities and limitations to be considered in the planning of Space Shuttle/Spacelab sortie missions are discussed. As shown by a simple model of the flow of STS equipment through ground processing and flights under ideal conditions, mission duration is constrained by Orbiter availability, which is determined initially by the Orbiter production schedule and the turnaround time required between missions, and by the usage rate and quantity limitations of mission consumables. Additional considerations affecting mission duration include reductions in crew productivity upon increased mission duration and crew size, spacecraft and experiment degradation, equipment and processing facility cost effectiveness, and requirements for a power extension package, which considerations imply that increased allowable landing weight would make co-manifesting (the combination of Spacelab and deliverable payload missions) more attractive. Advantages related to payload recoverability, human presence, ease of access and the availability of different orbits are also pointed out.
Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan
NASA Technical Reports Server (NTRS)
1988-01-01
An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.
NASA Technical Reports Server (NTRS)
1972-01-01
The technical and cost analysis that was performed for the payload system operations analysis is presented. The technical analysis consists of the operations for the payload/shuttle and payload/tug, and the spacecraft analysis which includes sortie, automated, and large observatory type payloads. The cost analysis includes the costing tradeoffs of the various payload design concepts and traffic models. The overall objectives of this effort were to identify payload design and operational concepts for the shuttle which will result in low cost design, and to examine the low cost design concepts to identify applicable design guidelines. The operations analysis examined several past and current NASA and DoD satellite programs to establish a shuttle operations model. From this model the analysis examined the payload/shuttle flow and determined facility concepts necessary for effective payload/shuttle ground operations. The study of the payload/tug operations was an examination of the various flight timelines for missions requiring the tug.
Design criteria for payload workstation accommodations
NASA Technical Reports Server (NTRS)
Watters, H. H.; Stokes, J. W.
1975-01-01
Anticipated shuttle sortie payload man-system design criteria needs are investigated. Man-system interactions for the scientific disciplines are listed and the extent is assessed to which documented Skylab experience is expected to provide system design guidance for each of the identified interactions. Where the analysis revealed that the reduced Skylab data does not answer the anticipated needs candidate criteria, based on unreduced Skylab data, available prior research, original analysis, or related requirements derived from previous space programs, are provided.
NASA Technical Reports Server (NTRS)
Hatterick, R. G.
1973-01-01
A skill requirement definition method was applied to the problem of determining, at an early stage in system/mission definition, the skills required of on-orbit crew personnel whose activities will be related to the conduct or support of earth-orbital research. The experiment data base was selected from proposed experiments in NASA's earth orbital research and application investigation program as related to space shuttle missions, specifically those being considered for Sortie Lab. Concepts for two integrated workstation consoles for Sortie Lab experiment operations were developed, one each for earth observations and materials sciences payloads, utilizing a common supporting subsystems core console. A comprehensive data base of crew functions, operating environments, task dependencies, task-skills and occupational skills applicable to a representative cross section of earth orbital research experiments is presented. All data has been coded alphanumerically to permit efficient, low cost exercise and application of the data through automatic data processing in the future.
Ion beam plume and efflux characterization flight experiment study. [space shuttle payload
NASA Technical Reports Server (NTRS)
Sellen, J. M., Jr.; Zafran, S.; Cole, A.; Rosiak, G.; Komatsu, G. K.
1977-01-01
A flight experiment and flight experiment package for a shuttle-borne flight test of an 8-cm mercury ion thruster was designed to obtain charged particle and neutral particle material transport data that cannot be obtained in conventional ground based laboratory testing facilities. By the use of both ground and space testing of ion thrusters, the flight worthiness of these ion thrusters, for other spacecraft applications, may be demonstrated. The flight experiment definition for the ion thruster initially defined a broadly ranging series of flight experiments and flight test sensors. From this larger test series and sensor list, an initial flight test configuration was selected with measurements in charged particle material transport, condensible neutral material transport, thruster internal erosion, ion beam neutralization, and ion thrust beam/space plasma electrical equilibration. These measurement areas may all be examined for a seven day shuttle sortie mission and for available test time in the 50 - 100 hour period.
NASA Technical Reports Server (NTRS)
Eaton, L. R.; Greco, R. V.; Hollinden, A. B.
1973-01-01
The candidate definition studies on the zero-g cloud physics laboratory are covered. This laboratory will be an independent self-contained shuttle sortie payload. Several critical technology areas have been identified and studied to assure proper consideration in terms of engineering requirements for the final design. Areas include chambers, gas and particle generators, environmental controls, motion controls, change controls, observational techniques, and composition controls. This unique laboratory will allow studies to be performed without mechanical, aerodynamics, electrical, or other type techniques to support the object under study. This report also covers the candidate experiment definitions, chambers and experiment classes, laboratory concepts and plans, special supporting studies, early flight opportunities and payload planning data for overall shuttle payload requirements assessments.
Continuing Issues (FY 1979) Regarding DoD Use of the Space Transportation System.
1979-12-01
estimates) to the cost of launching experimental payloads In the sortie mode is the analytical verification of compatibility ("Integrsaton") of the experiment...with the Shuttle; the Integration cost mya be reduced by the Air Force by treir proposed "class cargo" generalized integra- tion analysis that, once...camactness and light weight (for a given experimental weight) rather than on intrinsic cost , to minmize lazc costa as couted by the NASA volume and weight
NASA Technical Reports Server (NTRS)
1973-01-01
Information related to proposed earth observation experiments for shuttle sortie missions (SSM) in the 1980's is presented. The step-wise progression of study activities and the development of the rationale that led to the identification, selection, and description of earth observation experiments for SSM are listed. The selected experiments are described, defined, and documented by individual disciplines. These disciplines include: oceanography; meteorology; agriculture, forestry, and rangeland; geology; hydrology; and environmental impact.
NASA Technical Reports Server (NTRS)
1972-01-01
The work performed to arrive at a baseline astronomy sortie mission concept is summarized. The material includes: (1) definition of the telescopes and arrays; (2) preliminary definition of mission and systems; (3) identification, definition, and evaluation of alternative sortie programs; (4) the recommended astronomy sortie program; and (5) the astronomy sortie program concept that was approved as a baseline for the remainder of the project.
Design of an adiabatic demagnetization refrigerator for studies in astrophysics
NASA Technical Reports Server (NTRS)
Castles, S.
1983-01-01
An adiabatic demagnetization refrigerator was designed for cooling infrared bolometers for studies in astrophysics and aeronomy. The design was tailored to the requirements of a Shuttle sortie experiment. The refrigerator should be capable of maintaining three bolometers at 0.1 K with a 90% cycle. The advantage are of operations the bolometer at 0.1K. greater sensitivity, faster response time, and the ability to use larger bolometer elements without compromising the response time. The design presented is the first complete design of an ADR intended for use in space. The most important of these specifications are to survive a Shuttle launch, to operate with 1.5 K - 2.0 K space-pumped liquid helium as a heat sink, to have a 90% duty cycle, and to be highly efficient.
Space station analysis study. Part 2, Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1977-01-01
Objectives of the space station program requiring the support of man in space, either in the shuttle sortie mode or in extended duration facilities are identified and analyzed. A set of functional requirements was derived to identify specific technology advancement needs, tests to be conducted, and processes to be developed. Program options are summarized for: (1) satellite power system; (2) earth services; (3) space cosmological research and development; (4) space processing and manufacturing; (5) multidiscipline science laboratory; (6) sensor development facility; (7) living and working in space; and (8) orbital depot.
NASA Technical Reports Server (NTRS)
Oren, J. A.
1982-01-01
The soft tube radiator subsystem is described including applicable system requirements, the design and limitations of the subsystem components, and the panel manufacturing method. The soft tube radiator subsystem is applicable to payloads requiring 1 to 12 kW of heat rejection for orbital lifetimes per mission of 30 days or less. The flexible radiator stowage volume required is about 60% and the system weight is about 40% of an equivalent heat rejection rigid panel. The cost should also be considerably less. The flexible radiator is particularly suited to shuttle orbiter sortie payloads and also whose mission lengths do not exceed the 30 day design life.
NASA Technical Reports Server (NTRS)
Acton, L.
1989-01-01
The results of the discusions of a working group for the definition of a program for the forthcoming crest of solar activity, 1990 to 1993 are presented. The MAX '91 program described are intended to achieve important scientific goals within the context of the natural solar variability. The heart of the MAX '91 program is a series of campaigns oriented towards specific scientific problems, and taking place in the solar maximum period 1990 to 1993. These campaigns will take advantage of the load-carrying capability of the Space Shuttle to fly instruments with observational capabilities very different from those of the Solar Maximum Mission. Various combinations of instruments appropriate to the specific scientific problem of a given campaign would be flown on a Shuttle sortie mission.
Analysis of F-16 radar discrepancies
NASA Astrophysics Data System (ADS)
Riche, K. A.
1982-12-01
One hundred and eight aircraft were randomly selected from three USAF F-16 bases and examined. These aircraft included 63 single-seat F-16As and 45 two-seat F-16Bs and encompassed 8,525 sorties and 748 radar system write-ups. Programs supported by the Statistical Package for the Social Sciences (SPSS) were run on the data. Of the 748 discrepancies, over one-third of them occurred within three sorties of each other and half within six sorties. Sixteen percent of all aircraft which had a discrepancy within three sorties had another write-up within the next three sorties. Designated repeat/recurring write-ups represented one-third of all the instances in which the write-up separation interval was three sorties or less. This is an indication that maintenance is unable to correct equipment failures as they occur, most likely because the false alarm rate is too high and maintenance is unable to duplicate the error conditions on the ground for correct error diagnosis.
Scintillation Observations and Response of The Ionosphere to Electrodynamics (SORTIE)
NASA Astrophysics Data System (ADS)
Crowley, G.
2015-12-01
The Scintillation Observations and Response of The Ionosphere to Electrodynamics, or SORTIE, mission is a 6U NASA Heliophysics CubeSat designed to study the ionosphere at altitudes below 400km. The SORTIE mission is being developed by a team including ASTRA (lead institution), AFRL, University of Texas at Dallas (UTD), COSMIAC (Satellite Integrator), and Boston College. SORTIE will address cutting-edge science in the area of ionospheric dynamics. The SORTIE mission will address the following science questions: Q1) Discover the sources of wave-like plasma perturbations in the F-region ionosphere. Q2) Determine the relative role of dynamo action and more direct mechanical forcing in the formation of wave-like plasma perturbations. To address these questions we plan to fly a CubeSat with novel sensors that measure key plasma parameters in a circular, low to middle inclination orbit near 350-400 km altitude. The sensors include an ion velocity meter (built by UTD) and a Planar Langmuir Probe (built by AFRL). The SORTIE mission plan is to describe the distribution of wave-like structures in the plasma density of the ionospheric F-region. In doing so, the SORTIE team will determine the possible role of these perturbations in aiding the growth of plasma instabilities. SORTIE will provide (1) the initial spectrum of wave perturbations which are the starting point for the RT calculation; (2) measured electric fields which determine the magnitude of the instability growth rate near the region where plasma bubbles are generated; (3) initial observations of irregularities in plasma density which result from RT growth. SORTIE results will be used as input to PBMOD, an assimilative first-principles physical model of the ionosphere, in order to predict evolution of EPBs. In this presentation, we will review the science objectives, provide an overview of the spacecraft and instrument design, and present a concept of operations plan.
Visible and shortwave infrared focal planes for remote sensing instruments
NASA Astrophysics Data System (ADS)
Tower, J. R.; McCarthy, B. M.; Pellon, L. E.; Strong, R. T.; Elabd, H.
1984-01-01
The development of solid-state sensor technology for multispectral linear array (MLA) instruments is described. A buttable four-spectral-band linear-format CCD and a buttable two-spectral band linear-format short-wave IR CCD have been designed, and first samples have been demonstrated. In addition, first-sample four-band interference filters have been fabricated, and hybrid packaging technology is being developed. Based on this development work, the design and construction of focal planes for a Shuttle sortie MLA instrument have begun. This work involves a visible and near-IR focal plane with 2048 pixels x 4 spectral bands and a short-wave IR focal plane with 1024 pixels x 2 spectral bands.
Command and data handling of science signals on Spacelab
NASA Technical Reports Server (NTRS)
Mccain, H. G.
1975-01-01
The Orbiter Avionics and the Spacelab Command and Data Management System (CDMS) combine to provide a relatively complete command, control, and data handling service to the instrument complement during a Shuttle Sortie Mission. The Spacelab CDMS services the instruments and the Orbiter in turn services the Spacelab. The CDMS computer system includes three computers, two I/O units, a mass memory, and a variable number of remote acquisition units. Attention is given to the CDMS high rate multiplexer, CDMS tape recorders, closed circuit television for the visual monitoring of payload bay and cabin area activities, methods of science data acquisition, questions of transmission and recording, CDMS experiment computer usage, and experiment electronics.
NASA Technical Reports Server (NTRS)
Gary, G. A. (Editor); Clifton, K. S. (Editor)
1976-01-01
The prospects of cometary research from the space shuttle are examined. Topics include: the shuttle as research environment; on-board experiments at zero-gravity and release of gas and dust to simulate cometary phenomena; and cometary observations from space.
Proceedings of the Space Shuttle Environmental Assessment Workshop on Stratospheric Effects
NASA Technical Reports Server (NTRS)
Potter, A. E. (Compiler)
1977-01-01
Various aspects of the potential environmental impact of space shuttle exhaust are explored. Topics include: (1) increased ultraviolet radiation levels in the biosphere due to destruction of atmospheric ozone; (2) climatic changes due to aerosol particles affecting the planetary albedo; (3) space shuttle propellants (including alternate formulations); and (4) measurement of space shuttle exhaust products.
Applications of Tethers in Space: Workshop Proceedings, Volume 2
NASA Technical Reports Server (NTRS)
Baracat, W. A. (Compiler)
1986-01-01
Topics addressed include: tethered orbital transfer vehicle operations, Centaur and Shuttle tether technology; tethered constellations, gravitational effects; Shuttle continuous open wind tunnel; optimal control laws, electrodynamic tether technology; and space station facilities.
Design and fabrication of a flexible tunnel for Sortie Laboratory
NASA Technical Reports Server (NTRS)
1975-01-01
A program was conducted to update a prototype design and to fabricate a flexible tunnel for a space shuttle/spacelab interface structure. The significant changes in the prototype are as follows: (1) elimination of foam from bladder laminate to increase bladder flexibility, (2) heat treat pulley brackets, bolts, and hinge pin to 160,000 psi minimum tensile strength, and (3) reduction of the meteoroid barrier from 0.5 inch to 0.375 inch. The thermal blanket installation study resulted in developing a method of installation by properly folding the various layers so that a uniform thickness could be maintained under the clamps. A single-lobe mockup was fabricated and cycled open and closed several times with no apparent damage to the blanket.
Orion Spacecraft MMOD Protection Design and Assessment
NASA Technical Reports Server (NTRS)
Bohl, W.; Miller, J.; Deighton, K.; Yasensky, J.; Foreman C.; Christiansen, Eric; Hyde, J.; Nahra, H.
2010-01-01
The Orion spacecraft will replace the Space Shuttle Orbiter for American and international partner access to the International Space Station by 2015 and, afterwards, for access to the moon for initial sorties and later for extended outpost visits as part of the Constellation Exploration Initiative. This work describes some of the efforts being undertaken to ensure that the Constellation Program, Orion Crew Exploration Vehicle design will meet or exceed the stringent micrometeoroid and orbital debris (MMOD) requirements set out by NASA when exposed to the environments encountered with these missions. This paper will provide a brief overview of the approaches being used to provide MMOD protection to the Orion vehicle and to assess the spacecraft for compliance to the Constellation Program s MMOD requirements.
Orbit Transfer Systems with Emphasis on Shuttle Applications, 1986-1991
NASA Technical Reports Server (NTRS)
1977-01-01
A systems study is presented for a transportation system which will follow the interim upper stage and spinning solid upper stage. Included are concepts, concept comparisons, trends, parametric data, etc. associated with the future system. Relevant technical and programmatic information is developed. This information is intended to focus future activity to identify attractive options and to summarize the major issues associated with the future development of the system. To establish a common basis for identifying current transportation concepts, an orbit transfer vehicle (OTV) is defined as a propulsive (velocity producing) rocket or stage. When used with a crew transfer module, a manned sortie module or other payloads, the combination becomes an orbit transfer system (OTS). Standardization of OTV's and OTS's is required.
NASA Technical Reports Server (NTRS)
1977-01-01
Topics discussed include: (1) design considerations for a MARS sample return laboratory module for space station investigations; (2) crew productivity as a function of work shift arrangement; (3) preliminary analysis of the local logistics problem on the space construction base; (4) mission hardware construction operational flows and timelines; (5) orbit transfer vehicle concept definition; (6) summary of results and findings of space processing working review; (7) crew and habitability subsystem (option L); (8) habitability subsystem considerations for shuttle tended option L; (9) orbiter utilization in manned sortie missions; (10) considerations in definition of space construction base standard module configuration (option L); (11) guidance, control, and navigation subsystems; and (12) system and design tradeoffs.
Simulation of Aircraft Sortie Generation Under an Autonomic Logistics System
2016-12-01
56 Design of Experiment...Figure 8. Pre -flight Operations ......................................................................................... 40 Figure 9. Sortie...Critical Factors and Their Associated Levels ................................................... 57 xiii Table 18. Design of Experiment
The Shuttle Environment Workshop
NASA Technical Reports Server (NTRS)
Lehmann, J.; Tanner, S. G. (Editor); Wilkerson, T. (Editor)
1983-01-01
Results of shuttle environmental measurement programs were presented. The implications for plasma, infrared and ultraviolet experiments were discussed. The prelaunch environmental conditions, results of key environmental measurements made during the flights of STS 1, 2, 3, 4, and postlanding environmental conditions were covered.
Astronomy sortie missions definition study. Volume 2, book 2: Appendix
NASA Technical Reports Server (NTRS)
1972-01-01
An updated and coordinated baseline experiment definition document is presented for each of the candidate astronomy sortie mission telescopes and arrays. The experiment objectives, requirements, interfaces, timelines, and programmatic considerations are included.
MSFC Sortie Laboratory Environmental Control System (ECS) phase B design study results
NASA Technical Reports Server (NTRS)
Ignatonis, A. J.; Mitchell, K. L.
1974-01-01
Phase B effort of the Sortie Lab program has concluded. Results of that effort are presented which pertain to the definitions of the environmental control system (ECS). Numerous design studies were performed in Phase B to investigate system feasibility, complexity, weight, and cost. The results and methods employed for these design studies are included. An autonomous Sortie Lab ECS was developed which utilizes a deployed space radiator. Total system weight was projected to be 1814.4 kg including the radiator and fluids. ECS power requirements were estimated at 950 watts.
Exobiology in Earth orbit: The results of science workshops held at NASA, Ames Research Center
NASA Technical Reports Server (NTRS)
Defrees, D. (Editor); Brownlee, D. (Editor); Tarter, J. (Editor); Usher, D. (Editor); Irvine, W. (Editor); Klein, H. (Editor)
1989-01-01
The Workshops on Exobiology in Earth Orbit were held to explore concepts for orbital experiments of exobiological interest and make recommendations on which classes of experiments should be carried out. Various observational and experimental opportunities in Earth orbit are described including those associated with the Space Shuttle laboratories, spacecraft deployed from the Space Shuttle and expendable launch vehicles, the Space Station, and lunar bases. Specific science issues and technology needs are summarized. Finally, a list of recommended experiments in the areas of observational exobiology, cosmic dust collection, and in situ experiments is presented.
Fluid control pump (in French)
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1973-10-31
La pompe est caracterisee en ce qu'elle comporte un dispositif destine a soumettre le fluide a pomper a des impulsions repetees alors que ce fluide est renferme dans une chambre comportant des raccords d'entree et de sortie dans chacun desquels une valve fluidique est montee de maniere que les impulsions facilitent la penetration de ce fluide dans la chambre par la valve fluidique du raccord d'entree et qu'elles facilitent egalement la sortie de ce fluide de la chambre par la valve fluidique du raccord de sortie, la sortie du fluide de la chambre par la valve fluidique du raccord d'entreemore » etant cependant reduite, le dispositif comprenant un troncon d'aspiration reliant la chambre a un ejecteur qui comporte un canal relie a une alimentation en gaz comprime, et un element sur lequel le fluide pompe agit pour qu'il obture de maniere intermittente ce canal. (FR)« less
COMPASS Final Report: Lunar Network Satellite-High Rate (LNS-HR)
NASA Technical Reports Server (NTRS)
oleson, Steven R.; McGuire, Melissa L.
2012-01-01
Two design options were explored to address the requirement to provide lunar piloted missions with continuous communications for outpost and sortie missions. Two unique orbits were assessed, along with the appropriate spacecraft (S/C) to address these requirements. Both constellations (with only two S/C each) provide full time coverage (24 hr/7 d) for a south polar base and also provide continuous 7 day coverage for sorties for specified sites and periodic windows. Thus a two-satellite system can provide full coverage for sorties for selected windows of opportunity without reconfiguring the constellation.
Dual Mission Scenarios for the Human Lunar Campaign - Performance, Cost and Risk Benefits
NASA Technical Reports Server (NTRS)
Saucillo, Rudolph J.; Reeves, David M.; Chrone, Jonathan D.; Stromgren, Chel; Reeves, John D.; North, David D.
2008-01-01
Scenarios for human lunar operations with capabilities significantly beyond Constellation Program baseline missions are potentially feasible based on the concept of dual, sequential missions utilizing a common crew and a single Ares I/CEV (Crew Exploration Vehicle). For example, scenarios possible within the scope of baseline technology planning include outpost-based sortie missions and dual sortie missions. Top level cost benefits of these dual sortie scenarios may be estimated by comparison to the Constellation Program reference two-mission-per-year lunar campaign. The primary cost benefit is the accomplishment of Mission B with a "single launch solution" since no Ares I launch is required. Cumulative risk to the crew is lowered since crew exposure to launch risks and Earth return risks are reduced versus comparable Constellation Program reference two-mission-per-year scenarios. Payload-to-the-lunar-surface capability is substantially increased in the Mission B sortie as a result of additional propellant available for Lunar Lander #2 descent. This additional propellant is a result of EDS #2 transferring a smaller stack through trans-lunar injection and using remaining propellant to perform a portion of the lunar orbit insertion (LOI) maneuver. This paper describes these dual mission concepts, including cost, risk and performance benefits per lunar sortie site, and provides an initial feasibility assessment.
U.S. mission plans for Spacelab
NASA Technical Reports Server (NTRS)
Sander, M. J.
1982-01-01
Mission configurations, instrumentation, and objectives for Spacelab sorties on board the Shuttle beginning in Sept. 1983 are reviewed. The first two flights will serve to verify the Spacelab systems and will be followed by operational status, including the fifth flight, which will be a reimbursible venture. Scientific investigations in the fields of atmospheric physics and environmental observation, space plasma physics, astronomy and solar physics, materials processing, and life sciences will be performed using the habitable long module, instrument pallets, and/or an instrument igloo mounted in the payload bay. Instrumentation, such as the imaging spectrometric observatory, which was developed in the U.S., will originate in either the U.S. or Europe. Details of the first four Spacelab flights are presented, noting that the OSS-3 through -7 missions will feature the first time that entire NASA payloads have returned to space.
2012-02-17
Skylab and Mir Space Stations: In 1964, design and feasibility studies were initiated for missions that could use modified Apollo hardware for a number of possible lunar and Earth-orbital scientific and applications missions. An S-IVB stage of a Saturn V launch vehicle was outfitted completely as a workshop. The Skylab 1 Orbital Workshop with its Apollo Telescope Mount was launched into orbit May 14, 1973. The Skylab 2, 3 and 4 missions, each with three-man crews, proved that humans could live and work in space for extended periods. The Shuttle-Mir Program was a joint effort between 1994-1998 which allowed American and Russian crews to share expertise and knowledge while working together in space. As preparation for the construction of the International Space Station, Shuttle-Mir encompassed 11 space shuttle flights and 7 astronaut residencies on the Russian space station Mir. Poster designed by Kennedy Space Center Graphics Department/Greg Lee. Credit: NASA
The space shuttle payload planning working groups: Executive summaries
NASA Technical Reports Server (NTRS)
1973-01-01
The findings of a space shuttle payload planning group session are presented. The purpose of the workshop is: (1) to provide guidance for the design and development of the space shuttle and the spacelab and (2) to plan a space science and applications program for the 1980 time period. Individual groups were organized to cover the various space sciences, applications, technologies, and life sciences. Summaries of the reports submitted by the working groups are provided.
Nuclear reactor power for an electrically powered orbital transfer vehicle
NASA Technical Reports Server (NTRS)
Jaffe, L.; Beatty, R.; Bhandari, P.; Chow, E.; Deininger, W.; Ewell, R.; Fujita, T.; Grossman, M.; Kia, T.; Nesmith, B.
1987-01-01
To help determine the systems requirements for a 300-kWe space nuclear reactor power system, a mission and spacecraft have been examined which utilize electric propulsion and this nuclear reactor power for multiple transfers of cargo between low earth orbit (LEO) and geosynchronous earth orbit (GEO). A propulsion system employing ion thrusters and xenon propellant was selected. Propellant and thrusters are replaced after each sortie to GEO. The mass of the Orbital Transfer Vehicle (OTV), empty and dry, is 11,000 kg; nominal propellant load is 5000 kg. The OTV operates between a circular orbit at 925 km altitude, 28.5 deg inclination, and GEO. Cargo is brought to the OTV by Shuttle and an Orbital Maneuvering Vehicle (OMV); the OTV then takes it to GEO. The OTV can also bring cargo back from GEO, for transfer by OMV to the Shuttle. OTV propellant is resupplied and the ion thrusters are replaced by the OMV before each trip to GEO. At the end of mission life, the OTV's electric propulsion is used to place it in a heliocentric orbit so that the reactor will not return to earth. The nominal cargo capability to GEO is 6000 kg with a transit time of 120 days; 1350 kg can be transferred in 90 days, and 14,300 kg in 240 days. These capabilities can be considerably increased by using separate Shuttle launches to bring up propellant and cargo, or by changing to mercury propellant.
Space Shuttle Damper System for Ground Wind Load Tests
NASA Technical Reports Server (NTRS)
Robinson, G. D.; Holt, J. R.; Chang, C. S.
1973-01-01
An active damper system which was originally developed for a 5.5% Saturn IB/Skylab Ground Winds Model was modified and used for similar purposes in a Space Shuttle model. A second damper system which was originally used in a 3% Saturn V/Dry Workshop model was also modified and made compatible with the Space Shuttle model to serve as a back-up system. Included in this final report are descriptions of the modified damper systems and the associated control and instrumentation.
NASA Technical Reports Server (NTRS)
1972-01-01
This study was undertaken to develop conceptual designs for a manned, space shuttle sortie mission laboratory capable of supporting a wide variety of experiments in conjunction with communications and navigation research. This space/laboratory would be one in which man may effectively increase experiment efficiency by certain observations, modifications, setup, calibration, and limited maintenance steps. In addition, man may monitor experiment progress and perform preliminary data evaluation to verify proper equipment functioning and may terminate or redirect experiments to obtain the most desirable end results. The flexibility and unique capabilities of man as an experimenter in such a laboratory will add greatly to the simplification of space experiments and this provides the basis for commonality in many of the supportive subsystems, thus reaping the benefits of reusability and reduced experiment costs. For Vol. 4, see N73-19268.
User data dissemination concepts for earth resources
NASA Technical Reports Server (NTRS)
Davies, R.; Scott, M.; Mitchell, C.; Torbett, A.
1976-01-01
Domestic data dissemination networks for earth-resources data in the 1985-1995 time frame were evaluated. The following topics were addressed: (1) earth-resources data sources and expected data volumes, (2) future user demand in terms of data volume and timeliness, (3) space-to-space and earth point-to-point transmission link requirements and implementation, (4) preprocessing requirements and implementation, (5) network costs, and (6) technological development to support this implementation. This study was parametric in that the data input (supply) was varied by a factor of about fifteen while the user request (demand) was varied by a factor of about nineteen. Correspondingly, the time from observation to delivery to the user was varied. This parametric evaluation was performed by a computer simulation that was based on network alternatives and resulted in preliminary transmission and preprocessing requirements. The earth-resource data sources considered were: shuttle sorties, synchronous satellites (e.g., SEOS), aircraft, and satellites in polar orbits.
A Comparative Study of KC-135 Operations in Vietnam, Desert Storm, and Allied Force
2000-06-01
aircraft and 15 sorties. Because of its proximity, and thus potential offload capability, it was highly prized by SAC planners. Finally, Korat took...Disposition in 1972 Base Aircraft Crews Sorties per Day U-Tapao 46 88 60 Clark 28 37 25 Don Muang 13 23 15 Takhli 20 36 24 Korat
ISS and Shuttle Payload Research Development and Processing
NASA Technical Reports Server (NTRS)
Calhoun, Kyle A.
2010-01-01
NASA's ISS and Spacecraft Processing Directorate (UB) is charged with the performance of payload development for research originating through NASA, ISS international partners, and the National Laboratory. The Payload Development sector of the Directorate takes biological research approved for on orbit experimentation from its infancy stage and finds a way to integrate and implement that research into a payload on either a Shuttle sortie or Space Station increment. From solicitation and selection, to definition, to verification, to integration and finally to operations and analysis, Payload Development is there every step of the way. My specific work as an intern this summer has consisted of investigating data received by separate flight and ground control Advanced Biological Research Systems (ABRS) units for Advanced Plant Experiments (APEX) and Cambium research. By correlation and analysis of this data and specific logbook information I have been working to explain changes in environmental conditions on both the flight and ground control unit. I have then, compiled all of that information into a form that can be presentable to the Principal Investigator (PI). This compilation allows that PI scientist to support their findings and add merit to their research. It also allows us, as the Payload Developers, to further inspect the ABRS unit and its performance
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (second from right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Stephanie Stilson (center), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (left), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (second from right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (center), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Stephanie Stilson (right), NASA Vehicle Manager, briefs the media attending an informative workshop and tour of the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, the media received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. During the tour of the OPF, reporters saw work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
Astronomy sortie mission definition study. Addendum: Follow-on analyses
NASA Technical Reports Server (NTRS)
1973-01-01
Results of design analyses, trade studies, and planning data of the Astronomy Sortie Mission Definition Study are presented. An in-depth analysis of UV instruments, nondeployed solar payload, and on-orbit access is presented. Planning data are considered, including the cost and schedules associated with the astronomy instruments and/or support hardware. Costs are presented in a parametric fashion.
Chief of Naval Air Training Automated Management Information System (CAMIS). User’s Guide.
1982-04-01
display. This display allows the user to insert, update, delete , or analyze various data elements, or generate reports. The Flight Schedule Input...instructor, student, and aircraft utiliza- tion. Additionally, it provides a means to delete any erroneous sortie information previously entered. 5...appear: 10 Technical Report 121 VT-## FLIGHT SCHEDULE PROGRAM 1. ADD NEW FLIGHT SCHEDULE DATA 2. DELETE ERRONEOUS SORTIES PREVIOUSLY ENTERED KEY IN
1993-01-01
Because a Coalition frontal assault raised the likelihood of heavy Coalition losses , the President authorized the addition of more ground and air forces...although the greatest weight of effort was directed against air defenses, airfields, and command elements of the Iraqi regime. Although sortie rates remained...first week of the war, most on the first night and only sparingly after that. Not surprisingly, most Iraqi air combat sorties and air-to-air losses (14
International Workshop on Vibration Isolation Technology for Microgravity Science Applications
NASA Technical Reports Server (NTRS)
Lubomski, Joseph F. (Editor)
1992-01-01
The International Workshop on Vibration Isolation Technology for Microgravity Science Applications was held on April 23-25, 1991 at the Holiday Inn in Middleburg Heights, Ohio. The main objective of the conference was to explore vibration isolation requirements of space experiments and what level of vibration isolation could be provided both by present and planned systems on the Space Shuttle and Space Station Freedom and by state of the art vibration isolation technology.
The Sortie-Generation Model System. Volume 5. Maintenance Subsystem
1981-09-01
Compuger RoanutI f and moidel 11, Computer operatinS system 17, Proorammino largualviso IS. Numlier of .ugic proltsm Hoewl -3 CSCobol 600 stuscomentm...THE SORTIE-GENERATION MODEL SYSTEM OC’ VOLUME V MAINTENANCE SUBSYSTEM September 1981 Robert S. Greenberg 05$ Prepared pursuant to Department of...Generation Model System Volume V Maintenance Subsystem 6. PERFORMING ORG. REPORT NUMBER LMI Task- L102 7. AUTHOR(a) 8. CONTRACT OR GRANT NUMBER(a
NASA Technical Reports Server (NTRS)
1973-01-01
The Life Sciences Payload Definition and Integration Study was composed of four major tasks. Tasks A and B, the laboratory definition phase, were the subject of prior NASA study. The laboratory definition phase included the establishment of research functions, equipment definitions, and conceptual baseline laboratory designs. These baseline laboratories were designated as Maxi-Nom, Mini-30, and Mini-7. The outputs of Tasks A and B were used by the NASA Life Sciences Payload Integration Team to establish guidelines for Tasks C and D, the laboratory integration phase of the study. A brief review of Tasks A and B is presented provide background continuity. The tasks C and D effort is the subject of this report. The Task C effort stressed the integration of the NASA selected laboratory designs with the shuttle sortie module. The Task D effort updated and developed costs that could be used by NASA for preliminary program planning.
Scientific tradeoffs in pinhole/occulter facility accommodation
NASA Technical Reports Server (NTRS)
Hudson, Hugh S.
1988-01-01
The Pinhole/Occulter Facility (P/OF) consists of state-of-the-art instruments for the study of particle acceleration in the solar corona, and uses a large structure to obtain very high angular resolution. P/OF has been studied in the past as an attached payload for the Space Shuttle, and has been the subject of study by a NASA Science Working Group (P/OFSWG). Appendix A lists various technical studies and reports carried out under the auspices of P/OFSWG and the Program Development Office of NASA Marshall Space Flight Center. Under the rationalization of NASA flight opportunities following the Challenger disaster, and the beginning of the Space Station Freedom program, the sortie-mode deployment of P/OF seemed less efficient and desirable. Thus, NASA decided to reconsider P/OF for deployment on the Space Station Freedom. The technical studies for this deployment continue at the present and will evolve as our knowledge of Space Station architecture and capabilities increase. MSFC contracted with Teledyne Brown Engineering for these technical studies.
Preliminary design trade-offs for a multi-mission stored cryogen cooler
NASA Technical Reports Server (NTRS)
Sherman, A.
1978-01-01
Preliminary design studies were performed for a multi-mission solid cryogen cooler having a wide range of application for both the shuttle sortie and free flyer missions. This multi-mission cooler (MMC) is designed to be utilized with various solid cryogens to meet a wide range of instrument cooling from 10 K (with solid hydrogen) to 90 K. The baseline cooler utilizes two stages of solid cryogen and incorporates an optional, higher temperature third stage which is cooled by either a passive radiator or a thermoelectric cooler. The MMC has an interface which can accommodate a wide variety of instrument configurations. A shrink fit adapter is incorporated which allows a drop-in instrument integration. The baseline design provides cooling of approximately 1 watt over a 60 to 100 K temperature range and about 0.5 watts from 15 to 60 K for a one year lifetime. For low cooling loads and with use of the optional radiator shield, cooling lifetimes as great as 8 years are predicted.
User data dissemination concepts for earth resources: Executive summary
NASA Technical Reports Server (NTRS)
Davies, R.; Scott, M.; Mitchell, C.; Torbett, A.
1976-01-01
The impact of the future capabilities of earth-resources data sensors (both satellite and airborne) and their requirements on the data dissemination network were investigated and optimum ways of configuring this network were determined. The scope of this study was limited to the continental U.S.A. (including Alaska) and to the 1985-1995 time period. Some of the conclusions and recommendations reached were: (1) Data from satellites in sun-synchronous polar orbits (700-920 km) will generate most of the earth-resources data in the specified time period. (2) Data from aircraft and shuttle sorties cannot be readily integrated in a data-dissemination network unless already preprocessed in a digitized form to a standard geometric coordinate system. (3) Data transmission between readout stations and central preprocessing facilities, and between processing facilities and user facilities are most economically performed by domestic communication satellites. (4) The effect of the following factors should be studied: cloud cover, expanded coverage, pricing strategies, multidiscipline missions.
A Personnel Launch System for safe and efficient manned operations
NASA Astrophysics Data System (ADS)
Petro, Andrew J.; Andrews, Dana G.; Wetzel, Eric D.
1990-10-01
Several Conceptual designs for a simple, rugged Personnel Launch System (PLS) are presented. This system could transport people to and from Low Earth Orbit (LEO) starting in the late 1990's using a new modular Advanced Launch System (ALS) developed for the Space Exploration Initiative (SEI). The PLS is designed to be one element of a new space transportation architecture including heavy-lift cargo vehicles, lunar transfer vehicles, and multiple-role spcecraft such as the current Space Shuttle. The primary role of the PLS would be to deliver crews embarking on lunar or planetary missions to the Space Station, but it would also be used for earth-orbit sortie missions, space rescue missions, and some satellite servicing missions. The PLS design takes advantage of emerging electronic and structures technologies to offer a robust vehicle with autonomous operating and quick turnaround capabilities. Key features include an intact abort capability anywhere in the operating envelope, and elimination of all toxic propellants to streamline ground operations.
Project CHECO Southeast Asia Report. Interdiction in Route Package One, 1968
1969-06-30
For instance, on 31 July, 50 trucks were spotted on Route 101 and attacked with negligible results, But during 100 percent moonlight , very few trucks...to collect their repair equipment where needed. To counter such a stereotyped strike pattern, a proposal was made to shift interdiction points...per thousand sorties. A total of 4,150 reconnaissance sorties was flown; 4,000,000 feet of film were exposed plus another 800,000 feet of gun-camera
Preliminary Analysis of Helicopter Options to Support Tunisian Counterterrorism Operations
2016-04-27
locations along roads and tracks in border areas, and small settlements in complex terrain (Figure 1, right; examples shown in Figure 2). Analysis For...political implications. In this preliminary analysis , we focus on the question of cost-effectiveness in the UH-60M’s primary role: Which alternative...platforms could perform the assault mission, and at what cost? The core of our analysis is detailed modeling of key “mission tasks” on a sortie-by-sortie
Predicting Aircraft Availability
2013-06-01
Table 9. Variables Used for Correlation Analysis Available ( N ) Available (%) Depot (%) UPNR ( N ) UPNR (%) TAI ( N ) MC (%) NMCB (%) NMCM (%) NMCS... Correlation Results Available Depot (%) UPNR ( N ) UPNR (%) TAI ( N ) MC (%) NMCB (%) NMCM (% NMCS (%) MMH / FH Hours FlowSorties FloSorties SchASD (H...28 Standardizing the Data………………………………………………………………..35 Correlation of
UAH/NASA Workshop on The Uses of a Tethered Satellite System
NASA Technical Reports Server (NTRS)
Wu, S. T. (Editor)
1978-01-01
Potential applications of the system are categorized into four areas: geological applications, atmospheric applications, electrodynamics and plasma studies, and technology applications. The multiple-use tethered system with feedback control, will be capable of supporting a payload or satellite suspended from the Shuttle cargo bay, at distances up to 100 kilometers from the Shuttle. Experiments proposed include: geomagnetic mapping, lower atmospheric measurements, ionospheric interactions with large space structures, solar wind transport, and magnetohydrodynamic measurements.
2015-08-19
finger-mounted units that produced a significant amount of artifact. The collection method matured to a helmet-mounted pulse oximeter (HMPO) unit...2015-5343. Helmet-mounted pulse oximeter data exist for 5847 sorties. Each sortie contains multiple +Gz exposures and each +Gz exposure is of...AGSM anti-G straining maneuver BMI body mass index CO cardiac output HMPO helmet-mounted pulse oximeter HR heart rate ID identification
2009-06-12
predict future losses in the monthly flying schedules. The purpose of the attrition is to ensure that units meet their sortie contract consistently. In...an era of decreasing force size, it is important for units to maximize aircrew training operations, without wasting manpower and resources. Thus, the ...primary research question is as follows: Is the current USAF scheduling technique of using a 5-year historical attrition rate an effective way to
Nontraditional Intelligence, Surveillance, and Reconnaissance: Making the Most of Airborne Assets
2015-10-01
Constrained Budgets,” White paper, 4. 36. Ibid., 3 . 37. Ibid., 4. 38. This pod would not include integration on “stealth” aircraft for obvious reasons. 39...sortie flow showing planned XCAS/convoy escort sorties 6 3 VDL-equipped Sniper XR/ATP 7 4 PED management team organization 9 vii Foreword It...platforms and capabilities. 3 In general, the military has a poor historical record when it comes to predicting who the adversary will be, what it
Sortie laboratory, phase B technical summary. [design and operational requirements
NASA Technical Reports Server (NTRS)
1973-01-01
The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.
Air & Space Power Journal. Volume 27, Number 2, March-April 2013
2013-04-01
Executive Sum- mary, 18. 40. It is difficult to find a definitive source and data due to variations in what sources count as sorties (i.e., sorties...April 2013 Air & Space Power Journal | 67 Sundberg A Case for Air Force Reorganization Feature tribution and broad variations in spans of control for...at 465,000 in 1992, 24 years later. Air Force Personnel Center, “Air Force Strength from 1948 thru 2010.” 16. Alfred Goldberg , ed., A History of the
Skylab reuse study, reference data. Part 2: Appendixes
NASA Technical Reports Server (NTRS)
1978-01-01
Contents: (1) evaluations of the dysbarism risk associated with a Skylab revisit by shuttle; (2) mission model/payload data sheets; (3) life sciences utilization of on-board Skylab medical facilities; (4) airlock module description; and (5) orbital workshop description.
2005-12-01
Arizona) and the ANG 162 FW (in Tucson, Arizona). Approximately 34,000 operations per year are conducted at Gila Bend AFAF ( Mendez 2005). Aircraft...high year of approximately 45,000 operations ( Mendez 2005). More than 50,000 sorties are conducted annually at BMGR East. While the sorties associated...have varied from a low of 22,000 per year and a high of 45,000 operations per year, with an average of about 34,000 operations ( Mendez 2005). The
Astronomy sortie missions definition study. Volume 4: Program development requirements
NASA Technical Reports Server (NTRS)
1972-01-01
Program development requirements for the selected Astronomy Sortie Missions concept were generated and are presented in four parts as follows: (1)the gross planning requirements that must be considered in subsequent phases of the project; (2)the schedules and logic networks for the design, development, and operation of the overall project; (3)the supporting research and technology required to support the project; and (4)the work breakdown data, from which cost data will be generated. Data reported in each part includes the appropriate rationale with explanations of the guidelines and assumptions that were used in the analyses and estimates.
Sortie précoce en post-partum: résultats et facteurs de risque de ré hospitalization
Kehila, Mehdi; Magdoud, Khaoula; Touhami, Omar; Abouda, Hassine Saber; Jeridi, Sara; Marzouk, Sofiène Ben; Mahjoub, Sami; Hmid, Rim Ben; Chanoufi, Mohamed Badis
2016-01-01
Cette étude nous permettra d'évaluer la pratique d'une sortie précoce en post-partum en analysant le taux de réadmission maternelle et en essayant d'identifier les facteurs de risque de ré hospitalisation. Il s'agit d'une étude prospective et analytique à propos de 1206 patientes sorties de l'hôpital à J1 du post-partum. Pour chaque patiente, nous avons noté les données épidémiologiques, le déroulement de la grossesse et de l'accouchement. Nous avons identifié les causes des ré hospitalisations ainsi que leur évolution. Le taux de césariennes était de 42%. Le taux de réadmissions maternelles était de 0,99%. La durée moyenne du séjour lors de la ré hospitalisation était de 26 heures. Les troubles du transit ont été le motif de consultation le plus fréquent (50% des cas) suivis par la fièvre (25% des cas). Les facteurs de risque de ré hospitalisation, identifiés dans notre étude étaient: la césarienne (p=0,004), la césarienne en urgence (p=0,016), l'anémie (p<0,001) et la thrombopénie (p=0,003). La sortie précoce en post-partum semble une option sure pour la maman et le nouveau-né sous réserve d'une information claire de la patiente et du respect des critères de sélection. PMID:27795786
New ideas for affordable space missions
Eller, E; Roussel-Dupre, D; Weiss, R; Bruegman, O
1996-04-01
In September 1995, NASA-Goddard held a workshop on low-cost access to space for science missions. The workshop provided briefings on balloons, sounding rockets, Shuttle payloads, and low-cost free-flyer concepts, to provide options of getting experiments into space. This report is the result of a panel session organized with the aim of generating new ideas beyond those presented in the workshop. In addition to the authors, Orlando Figueroa and Paul Ondrus of NASA-Goddard and Richard Zwirnbaum of Computer Sciences Corp. participated in the discussions. The ideas presented do not necessarily reflect the current thinking of NASA managers. Although the panel discussion was focused on the kinds of science missions usually funded by NASA, most of the ideas that were generated are relevant to military and commercial missions as well.
Suited crewmember productivity.
Barer, A S; Filipenkov, S N
1994-01-01
Analysis of the extravehicular activity (EVA) sortie experience gained in the former Soviet Union and physiologic hygienic aspect of space suit design and development shows that crewmember productivity is related to the following main factors: -space suit microclimate (gas composition, pressure and temperature); -limitation of motion activity and perception, imposed by the space suit; -good crewmember training in the ground training program; -level of crewmember general physical performance capabilities in connection with mission duration and intervals between sorties; -individual EVA experience (with accumulation) at which workmanship improves, while metabolism, physical and emotional stress decreases; -concrete EVA duration and work rate; -EVA bioengineering, including selection of tools, work station, EVA technology and mechanization.
NASA Astrophysics Data System (ADS)
Davis, S. L.; Moran, E.
2015-12-01
Many predictions about how trees will respond to climate change have been made, but these often rely on extrapolating into the future one of two extremes: purely correlative factors like climate, or purely physiological factors unique to a particular species or plant functional group. We are working towards a model that combines both phenotypic and genotypic traits to better predict responses of trees to climate change. We have worked to parameterize a neighborhood dynamics, individual tree forest-gap model called SORTIE-ND, using open data from both the USDA Forest Service Forest Inventory & Analysis (FIA) datasets in California and 30-yr old permanent plots established by the USGS. We generated individual species factors including stage-specific mortality and growth rates, and species-specific allometric equations for ten species, including Abies concolor, A. magnifica, Calocedrus decurrens, Pinus contorta, P. jeffreyi, P. lambertiana, P. monticola, P. ponderosa, and the two hardwoods Quercus chrysolepis and Q. kelloggii. During this process, we also developed two R packages to aid in parameter development for SORTIE-ND in other ecological systems. MakeMyForests is an R package that parses FIA datasets and calculates parameters based on the state averages of growth, light, and allometric parameters. disperseR is an R package that uses extensive plot data, with individual tree, sapling, and seedling measurements, to calculate finely tuned mortality and growth parameters for SORTIE-ND. Both are freely available on GitHub, and future updates will be available on CRAN. To validate the model, we withheld several plots from the 30-yr USGS data while calculating parameters. We tested for differences between the actual withheld data and the simulated forest data, in basal area, seedling density, seed dispersal, and species composition. The similarity of our model to the real system suggests that the model parameters we generated with our R packages accurately represent the system, and that our model can be extended to include changes in precipitation, temperature, and disturbance with very little manipulaton. We hope that our examples, R package development, and SORTIE-ND module development will enable other ecologists to utilize SORTIE-ND to predict changes in local and important ecoystems around the world.
Report on the NASA Soft and Complex Condensed Matter Workshop
NASA Technical Reports Server (NTRS)
Singh, Bhim (Technical Monitor); Chaikin, Paul; Nagel, Sidney
2003-01-01
During the past decade, NASA has been a leading U.S. supporter of soft and complex condensed matter research. Experiments in space shuttles, MIR, the International Space Station (ISS), as well as ground-based research have provided new insights into several areas including hard sphere colloids, crystal growth, phase ordering, and transport of complex fluids at the critical point. To help define the next generation of flight experiments needed to answer remaining important questions in the field of soft and complex condensed matter, NASA's Office of Biological and Physical Science sponsored a workshop on Soft and Complex Condensed Matter, March 6, 2003. This workshop asked leading members in the field of Soft and Complex Condensed Matter (at the APS March Meeting) to help identify exciting unanswered questions in the field, along with specific research topics for which the absence of gravity would enable significant results unobtainable by other means. The workshop was attended by 24 participants from universities across the U.S. and from five different countries (in addition to NASA GRC participants).
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Media tour the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, they received the latest information on Discoverys processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon- Carbon and vehicle instrumentation. Later, reporters toured the OPF to see work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
2004-07-23
KENNEDY SPACE CENTER, FLA. - Media tour the Orbiter Processing Facility (OPF) housing the Space Shuttle Discovery at KSC. During this event, they received the latest information on Discovery’s processing and viewed workers preparing the vehicle for its safe return to flight scheduled for a launch planning window of March 2005. Kicking off the activities at the Press Site Auditorium, technical experts led two workshops addressing Reinforced Carbon-Carbon and vehicle instrumentation. Later, reporters toured the OPF to see work in progress on Discovery, including reinstallation of the Reinforced Carbon-Carbon panels on the Shuttle's wing leading edge, wiring inspections and instrumentation updates being completed for Return to Flight.
Suited crewmember productivity
NASA Astrophysics Data System (ADS)
Barer, A. S.; Filipenkov, S. N.
Analysis of the extravehicular activity (EVA) sortie experience gained in the former Soviet Union and physiologic hygienic aspect of space suit design and development shows that crewmember productivity is related to the following main factors: —space suit microclimate (gas composition, pressure and temperature); —limitation of motion activity and perception, imposed by the space suit; —good crewmember training in the ground training program; —level of crewmember general physical performance capabilities in connection with mission duration and intervals between sorties; —individual EVA experience (with accumulation) at which workmanship improves, while metabolism, physical and emotional stress decreases; —concrete EVA duration and work rate; —EVA bioengineering, including selection of tools, work station, EVA technology and mechanization.
Aerothermodynamic heating and performance analysis of a high-lift aeromaneuvering AOTV concept
NASA Technical Reports Server (NTRS)
Menees, G. P.; Brown, K. G.; Wilson, J. F.; Davies, C. B.
1985-01-01
The thermal-control requirements for design-optimized aeromaneuvering performance are determined for space-based applications and low-earth orbit sorties involving large, multiple plane-inclination changes. The leading-edge heating analysis is the most advanced developed for hypersonic-rarefied flow over lifting surfaces at incidence. The effects of leading-edge bluntness, low-density viscous phenomena, and finite-rate flow-field chemistry and surface catalysis are accounted for. The predicted aerothermodynamic heating characteristics are correlated with thermal-control and flight-performance capabilities. The mission payload capability for delivery, retrieval, and combined operations is determined for round-trip sorties extending to polar orbits. Recommendations are given for future design refinements. The results help to identify technology issues required to develop prototype operational systems.
Food Service and Nutrition for the Space Station
NASA Technical Reports Server (NTRS)
Sauer, R. L. (Editor)
1985-01-01
The proceedings of the Workshop on Food Service and Nutrition for the Space Station, held in Houston, Texas, on April 10 and 11, 1984 was given. The workshop was attended by experts in food technology from industry, government, and academia. Following a general definition of unique space flight requirements, oral presentations were made on state of the art food technology with the objective of using this technology to support the space flight requirements. Numerous areas are identified which in the opinion of the conferees, would have space flight application. But additional effort, evaluation, or testing to include Shuttle inflight testing will be required for the technology to be applied to the Space Station.
Thermal Analysis of Cryogenic Hydrogen Liquid Separator
NASA Technical Reports Server (NTRS)
Congiardo, Jared F.; Fortier, Craig R. (Editor)
2014-01-01
During launch for the new Space Launch System (SLS) liquid hydrogen is bleed through the engines during replenish, pre-press, and extended pre-press to condition the engines prior to launch. The predicted bleed flow rates are larger than for the shuttle program. A consequence of the increased flow rates is having liquif hydrogen in the vent system, which the facilities was never designed to handle. To remedy the problem a liquid separator is being designed in the system to accumulated the liquid propellant and protect the facility flare stack (which can only handle gas). The attached document is a presentation of the current thermalfluid analysis performed for the separator and will be presented at the Thermal and Fluid Analysis Workshop (NASA workshop) next week in Cleveland, Ohio.
High Resolution, High Frame Rate Video Technology
NASA Technical Reports Server (NTRS)
1990-01-01
Papers and working group summaries presented at the High Resolution, High Frame Rate Video (HHV) Workshop are compiled. HHV system is intended for future use on the Space Shuttle and Space Station Freedom. The Workshop was held for the dual purpose of: (1) allowing potential scientific users to assess the utility of the proposed system for monitoring microgravity science experiments; and (2) letting technical experts from industry recommend improvements to the proposed near-term HHV system. The following topics are covered: (1) State of the art in the video system performance; (2) Development plan for the HHV system; (3) Advanced technology for image gathering, coding, and processing; (4) Data compression applied to HHV; (5) Data transmission networks; and (6) Results of the users' requirements survey conducted by NASA.
OAST Technology for the Future. Executive Summary
NASA Technical Reports Server (NTRS)
1988-01-01
NASA's Office of Aeronautics and Space Technology (OAST) conducted a workshop on the In-Space Technology Experiments Program (IN-STEP) December 6-9, 1988, in Atlanta, Georgia. The purpose of this workshop was to identify and prioritize space technologies which are critical for future national space programs and which require validation in the space environment. A secondary objective was to review the current NASA (In-Reach) and Industry/University (Out-Reach) experiments. Finally, the aerospace community was requested to review and comment on the proposed plans for the continuation of the In-Space Technology Experiments Program. In particular, the review included the proposed process for focusing the next experiment selection on specific, critical technologies and the process for implementing the hardware development and integration on the Space Shuttle vehicle. The product of the workshop was a prioritized listing of the critical space technology needs in each of eight technology disciplines. These listings were the cumulative recommendations of nearly 400 participants, which included researchers, technologists, and managers from aerospace industries, universities, and government organizations.
Immersive Environments for Mission Operations: Beyond Mars Pathfinder
NASA Technical Reports Server (NTRS)
Wright, J.; Hartman, F.; Cooper, B.
1998-01-01
Immersive environments are just beginning to be used to support mission operations at the Jet Propulsion Laboratory. This technology contributed to the Mars Pathfinder Mission in planning sorties for the Sojourner rover.
Murray, Mike; Lange, Britt; Chreiteh, Shadi Samir; Olsen, Henrik Baare; Nørnberg, Bo Riebeling; Boyle, Eleanor; Søgaard, Karen; Sjøgaard, Gisela
2016-04-01
Neck pain among helicopter pilots and crew-members is common. This study quantified the physical workload on neck and shoulder muscles using electromyography (EMG) measures during helicopter flight. Nine standardized sorties were performed, encompassing: cruising from location A to location B (AB) and performing search and rescue (SAR). SAR was performed with Night Vision Goggles (NVG), while AB was performed with (AB+NVG) and without NVG (AB-NVG). EMG was recorded for: trapezius (TRA), upper neck extensors (UNE), and sternocleido-mastoid (SCM). Maximal voluntary contractions (MVC) were performed for normalization of EMG (MVE). Neck posture of pilots and crew-members was monitored and pain intensity of neck, shoulder, and back was recorded. Mean muscle activity for UNE was ∼10% MVE and significantly higher than TRA and SCM, and SCM was significantly lower than TRA. There was no significant difference between AB-NVG and AB+NVG. Muscle activity in the UNE was significantly higher during SAR+NVG than AB-NVG. Sortie time (%) with non-neutral neck posture for SAR+NVG and AB-NVG was: 80.4%, 74.5% (flexed), 55.5%, 47.9% (rotated), 4.5%, 3.7% (lateral flexed). Neck pain intensity increased significantly from pre- (0.7±1.3) to post-sortie (1.6±1.9) for pilots (p=0.028). If sustained, UNE activity of ∼10% MVE is high, and implies a risk for neck disorders. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
1975-01-01
Advanced technology requirements associated with sensing and data acquisition systems were assessed for future space missions. Sensing and data acquisition system payloads which would benefit from the use of the space shuttle in demonstrating technology readiness are identified. Topics covered include: atmospheric sensing payloads, earth resources sensing payloads, microwave systems sensing payloads, technology development/evaluation payloads, and astronomy/planetary payloads.
Brakebill, John W.; Sieverling, Jennifer B.; Chirico, Peter G.
2006-01-01
The U.S. Geological Survey's (USGS) Sixth Biennial Geographic Information Science Workshop April 24 - 28, 2006, at the Denver Federal Center in Denver, Colorado, provides a unique opportunity for multi-disciplinary Geographic Information Systems (GIS) and associated scientific professionals to share, learn, present, and discuss a wide variety of geospatial-related topics. Information is exchanged through a series of plenary sessions, hands-on technical workshops, user and commercial vendor demonstrations, lecture and poster sessions, and specialty meetings. Workshop attendance is limited to Department of Interior (DOI) and USGS employees and contractors; however, plenary, hands-on, and lecture sessions have presenters from other Federal agencies, numerous commercial vendors, universities, and several consortia. Over 175 participants are expected to attend the Workshop. Several prominent speakers are featured at this Workshop. Monday evening Star Guest Speaker and National Aeronautics and Space Administration (NASA) Astronaut Captain Dominic Gorie will talk about his experiences as a veteran of three space flights and over 32 days in space, including the NASA Space Shuttle Radar Topography Mission that mapped more than 47 million miles of the Earth's land surface. Selected as an astronaut candidate by NASA in December 1994, Captain Gorie is currently Chief of the Astronaut Shuttle Branch. Monday evening also features a town hall meeting with Geographic Information Office (GIO) leaders Karen Siderelis, Kevin Gallagher, Bob Pierce, Steve Guptill, Mark DeMulder, John Mahoney, and Mark Negri, who will discuss changes and activities within the GIO in an open discussion format. Tuesday plenary sessions feature keynote speaker Dr. P. Patrick Leahy, Acting USGS Director. Dr. Leahy holds undergraduate and graduate degrees in geology (1968) and geophysics (1970) from Boston College. In 1979, he received his doctorate in geology from Rensselaer Polytechnic Institute, where he specialized in regional ground-water studies and hydraulics. Dr. Leahy has been with the USGS since 1974, and has held various technical and managerial positions, including Associate Director for Geology and Chief of the National Water-Quality Assessment (NAWQA) Program. Dr. Leahy will be discussing a broad range of topics including Bureau accomplishments, initiatives, and budgets. The purpose of this proceedings volume is to serve as an activity reference for Workshop attendees as well as an archive of technical abstracts submitted, presented, and discussed at the Workshop. Author, co-author, and presenter names, affiliations, and contact information are listed with presentation titles along with submitted abstracts. Some hands-on sessions are offered twice. In these instances, abstracts submitted for publication are presented in the proceedings on both days they are offered. All acronyms used in these proceedings are explained in the text of each abstract. The term 'ArcGIS' refers to an integrated collection of GIS software products produced by Environmental Systems Research Institute, Inc. (ESRI).
Requirements of IR space astronomy
NASA Technical Reports Server (NTRS)
Low, Frank J.
1989-01-01
An introduction to a series of infrared detector technology workshops is given. The establishment of goals and new requirements is addressed in a general way. The Shuttle Infrared telescope Facility (SIRIF) goals are listed. Given that the wavelength coverage is established at 2 to 750 microns and the unvignetted field of view is 7 arcmin, the field should be fully utilized at each wavelength, diffraction should be critically sampled, and each detector should be background limited.
Lunar Orbit Insertion Targeting and Associated Outbound Mission Design for Lunar Sortie Missions
NASA Technical Reports Server (NTRS)
Condon, Gerald L.
2007-01-01
This report details the Lunar Orbit Insertion (LOI) arrival targeting and associated mission design philosophy for Lunar sortie missions with up to a 7-day surface stay and with global Lunar landing site access. It also documents the assumptions, methodology, and requirements validated by TDS-04-013, Integrated Transit Nominal and Abort Characterization and Sensitivity Study. This report examines the generation of the Lunar arrival parking orbit inclination and Longitude of the Ascending Node (LAN) targets supporting surface missions with global Lunar landing site access. These targets support the Constellation Program requirement for anytime abort (early return) by providing for a minimized worst-case wedge angle [and an associated minimum plane change delta-velocity (V) cost] between the Crew Exploration Vehicle (CEV) and the Lunar Surface Access Module (LSAM) for an LSAM launch anytime during the Lunar surface stay.
The role of man in flight experiment payload missions. Volume 1: Results
NASA Technical Reports Server (NTRS)
Malone, T. B.
1973-01-01
It is pointed out that a controversy exists concerning the required role of man, and his attendant skills and levels of skills, for Sortie Lab operations. As a result, a study was conducted to generate a taxonomy of candidate crew roles which would: (1) be applicable across all experiments, and (2) be usable for Sortie scientists and engineers in determination of level of skill as well as type of skill. Nine basic roles were identified in the study, and the tasks associated with each were developed from a functional description of a generalized in-flight experiment. The functional analysis comprised the baseline for establishment of crew roles, with roles being defined as combinations of tasks, associated skills, and knowledges. A role classification scheme was developed in which the functions and tasks identified were allocated to each of the nine role types. This classification scheme is presented together with the significant results of the study.
NASA Astrophysics Data System (ADS)
Bergeron, Alain
Cette recherche vise a la mise en oeuvre optique de reseaux neuronaux. Deux architectures differentes sont proposees. La premiere est la memoire associative permettant d'associer a un objet quelconque une sortie arbitraire tout en preservant l'information sur sa position. La seconde architecture, le classificateur neuronal pour le controle robotique, permet l'identification d'une entree et son classement selon differentes categories. La sortie est compatible avec les systemes numeriques standard. Pour realiser ces architectures, une approche modulaire est privilegiee. Le correlateur constitue le module de base des realisations. Differents modules sont de plus introduits pour realiser convenablement les operations neuronales. Le premier de ces modules est le seuil optoelectronique permettant de realiser une fonction non lineaire, element essentiel des reseaux neuronaux. Le second module a etre introduit est l'encodeur optonumerique, utile au classement des objets. Le probleme de l'enregistrement de la memoire est aborde a l'aide du codage iteratif global.
Method for Integrated Simulation (MINTSIM)
1976-01-01
sorties allocated to attack SAMs. FAPA = fraction of striking aircraft attacking air bases which attack parked aircraft in the open. TAAB...each striking aircraft. FAS = fraction of striking aircraft attacking air bases which attack sheltered aircraft. (NOTE: FAPA + FAS = 1.0
OAST Technology for the Future. Volume 3 - Critical Technologies, Themes 5-8
NASA Technical Reports Server (NTRS)
1988-01-01
NASA's Office of Aeronautics and Space Technology (OAST) conducted a workshop on the In-Space Technology Experiments Program IN-STEP) December 6-9, 1988, in Atlanta, Georgia. The purpose of this workshop was to identify and prioritize space technologies which are critical for future national space programs and which require validation in the 5 ace environment. A secondary objective was to review the current NASA (In-Reach and Industry/University (Out-Reach) experiments. Finally, the aerospace community was requested to review and comment on the proposed plans for the continuation of the In-Space Technology Experiments Program. In particular, the review included the proposed process for focusing the next experiment selection on specific, critical technologies and the process for implementing the hardware development and integration on the Space Shuttle vehicle. The product of the workshop was a prioritized listing of the critical space technology needs in each of eight technology disciplines. These listings were the cumulative recommendations of nearly 400 participants, which included researchers, technologists, and managers from aerospace industries, universities, and government organizations.
OAST Technology for the Future. Volume 2 - Critical Technologies, Themes 1-4
NASA Technical Reports Server (NTRS)
1988-01-01
NASA's Office of Aeronautics and Space Technology (OAST) conducted a workshop on the In-Space Technology Experiments Program IN-STEP) December 6-9, 1988, in Atlanta, Georgia. The purpose of this workshop was to identify and prioritize space technologies which are critical for future national space programs and which. require validation in the space environment. A secondary objective was to review the current NASA (InReach) and Industry/University (Out-Reach) experiments. Finally, the aerospace community was requested to review and comment on the proposed plans for the continuation of the In-Space Technology Experiments Program. In particular, the review included the proposed process for focusing the next experiment selection on specific, critical technologies and the process for implementing the hardware development and integration on the Space Shuttle vehicle. The product of the workshop was a prioritized listing of the critical space technology needs in each of eight technology disciplines. These listings were the cumulative recommendations of nearly 400 participants, which included researchers, technologists, and managers from aerospace industries, universities, and government organizations.
NASA Technical Reports Server (NTRS)
1978-01-01
The accommodations provided by the airlock module and the orbital workshop were completely examined with the thought of total reactivation as an enhancement to the STS long duration missions. Each subsystem is described and a summary of subsystem performance during the Skylab missions is presented. End-of-mission status and the status of today for each subsystem is shown together with refurbishment/resupply requirements and refurb kit descriptions to restore Skylab to full operational capability. An inspection/refurbishment and operations plan for Skylab is included. The initial Shuttle-tended operational activity would provide a safe, effective phase of Skylab rehabilitation while simultaneously benefitting the Orbiter crew through the addition of private accommodations, off-duty recreation area, and physical conditioning equipment. This period would also permit exercising selected onboard experiments.
Results from the July 1981 Workshop on Passive Remote Sensing of the Troposphere
NASA Technical Reports Server (NTRS)
Keafer, L. S., Jr.; Reichle, H. G., Jr.
1982-01-01
Potential roles of passive remote sensors in the study of the chemistry and related dynamics of the lower atmosphere were defined by a Tropospheric Passive Remote Sensing Workshop, and technology advances required to implement these roles were identified. A promising role is in making global-scale, multilayer measurements of the more abundant trace tropospheric gaseous species (e.g., O3, CO, CH4, HNO3) and of aerosol thickness and size distribution. It includes both nadirand limb-viewing measurements. Technology advances focus on both scanning- and fixed-spectra, nadir-viewing techniques with resolutions of 0.1 kaysers or better. Balloon- and Shuttle-borne experiments should be performed to study the effects of instrument noise and background fluctuations on data inversion and to determine the utility of simultaneously obtained nadir- and limb-viewing data.
An Exploratory Application of Neural Networks to the Sortie Generation Forecasting Problem
1991-09-01
modifiable--a configuration clearly inspired by neurophysiology . Rosenblatt and others effectively demonstrated that in using such an architectural...different perspectives (i.e., longitudinally and cross-sectionally), significance testing between prediction results may promote more enlightened network
CEV Trajectory Design Considerations for Lunar Missions
NASA Technical Reports Server (NTRS)
Condon, Gerald L.; Dawn, Timothy; Merriam, Robert S.; Sostaric, Ronald; Westhelle, Carlos H.
2007-01-01
The Crew Exploration Vehicle (CEV) translational maneuver Delta-V budget must support both the successful completion of a nominal lunar mission and an "anytime" emergency crew return with the potential for much more demanding orbital maneuvers. This translational Delta-V budget accounts for Earth-based LEO rendezvous with the lunar surface access module (LSAM)/Earth departure stage (EDS) stack, orbit maintenance during the lunar surface stay, an on-orbit plane change to align the CEV orbit for an in-plane LSAM ascent, and the Moon-to-Earth trans-Earth injection (TEI) maneuver sequence as well as post-TEI TCMs. Additionally, the CEV will have to execute TEI maneuver sequences while observing Earth atmospheric entry interface objectives for lunar high-latitude to equatorial sortie missions as well as near-polar sortie and long duration missions. The combination of these objectives places a premium on appropriately designed trajectories both to and from the Moon to accurately size the translational V and associated propellant mass in the CEV reference configuration and to demonstrate the feasibility of anytime Earth return for all lunar missions. This report examines the design of the primary CEV translational maneuvers (or maneuver sequences) including associated mission design philosophy, associated assumptions, and methodology for lunar sortie missions with up to a 7-day surface stay and with global lunar landing site access as well as for long duration (outpost) missions with up to a 210-day surface stay at or near the polar regions. The analyses presented in this report supports the Constellation Program and CEV project requirement for nominal and anytime abort (early return) by providing for minimum wedge angles, lunar orbit maintenance maneuvers, phasing orbit inclination changes, and lunar departure maneuvers for a CEV supporting an LSAM launch and subsequent CEV TEI to Earth return, anytime during the lunar surface stay.
NASA Technical Reports Server (NTRS)
1975-01-01
Payload experiments which could be carried out in near earth space using the shuttle orbiter, its payload bay, the Spacelab, and/or some free-flying device that might be used for long duration testing were identified. Specific areas examined in terms of user requirements include: chemical propulsion, nuclear propulsion (fission, fussion, radioisotopes), and collected energy (coherent energy and solar electromagnetic energy). Cost reduction objectives for advanced propulsion technology development were also developed.
Fourth Annual Workshop on Space Operations Applications and Research (SOAR 90)
NASA Technical Reports Server (NTRS)
Savely, Robert T. (Editor)
1991-01-01
The papers from the symposium are presented. Emphasis is placed on human factors engineering and space environment interactions. The technical areas covered in the human factors section include: satellite monitoring and control, man-computer interfaces, expert systems, AI/robotics interfaces, crew system dynamics, and display devices. The space environment interactions section presents the following topics: space plasma interaction, spacecraft contamination, space debris, and atomic oxygen interaction with materials. Some of the above topics are discussed in relation to the space station and space shuttle.
NASA Technical Reports Server (NTRS)
1975-01-01
Structural requirements for future space missions were defined in relation to technology needs and payloads. Specific areas examined include: large area space structures (antennas, solar array structures, and platforms); a long, slender structure or boom used to support large objects from the shuttle or hold two bodies apart in space; and advanced composite structures for cost effective weight reductions. Other topics discussed include: minimum gage concepts, high temperature components, load and response determination and control, and reliability and life prediction.
Inclement Weather Crater Repair Tool Kit
2017-11-30
Force’s Rapid Airfield Damage Repair (RADR) Program developed technologies to return bomb -damaged runways and taxiways to full operational sortie...ERDC/GSL TR-17-26 3 2 Inclement Weather Crater Repair Research This chapter gives an overview of the bomb -crater repair process and presents
Observing Solar Radio Bursts from the Lunar Surface
NASA Technical Reports Server (NTRS)
MacDowall, R. J.; Gopalswamy, N.; Kaiser, M. L.; Lazio, T. J.; Jones, D. L.; Bale, S. D.; Burns, J.; Kasper, J. C.; Weiler, K. W.
2011-01-01
Locating low frequency radio observatories on the lunar surface has a number of advantages, including fixes locations for the antennas and no terrestrial interference on the far side of the moon. Here, we describe the Radio Observatory for Lunar Sortie Science (ROLSS), a concept for a low frequency, radio imaging interferometric array designed to study particle acceleration in the corona and inner heliosphere. ROLSS would be deployed during an early lunar sortie or by a robotic rover as part of an unmanned landing. The prime science mission is to image type II and type III solar radio bursts with the aim of determining the sites at and mechanisms by which the radiating particles are accelerated. Secondary science goals include constraining the density of the lunar ionosphere by searching for a low radio frequency cutoff of the solar radio emissions and constraining the low energy electron population in astrophysical sources. Furthermore, ROLSS serves a pathfinder function for larger lunar radio arrays designed for faint sources.
Proceedings of the heavy lift launch vehicle tropospheric effects workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-12-01
A workshop, sponsored by the Argonne National Laboratory, on Heavy Lift Launch Vehicle (HLLV) troposheric effects was held in Chicago, Illinois, on September 12, 13, and 14, 1978. Briefings were conducted on the latest HLLV congigurations, launch schedules, and proposed fuels. The geographical, environmental, and ecological background of three proposed launch sites were presented in brief. The sites discussed were launch pads near the Kennedy Space Center (KSC), a site in the southwestern United States near Animus, New Mexico, and an ocean site just north of the equator off the coast of Ecuador. A review of past efforts in atmosphericmore » dynamics modeling, source term prediction, atmospheric effects, cloud rise modeling, and rainout/washout effects for the Space Shuttle tropospheric effects indicated that much of the progress made in these areas has direct applicability to the HLLV. The potential pollutants from the HLLV are different and their chymical interactions with the atmosphere are more complex, but the analytical techniques developed for the Space Shuttle can be applied, with the appropriate modification, to the HLLV. Reviews were presented of the ecological baseline monitoring being performed at KSC and the plant toxicology studies being conducted at North Carolina State. Based on the proposed launch sites, the latest HLLV configuration fuel, and launch schedule, the attendees developed a lit of possible environmental issues associated with the HLLV. In addition, a list of specific recommendations for short- and long-term research to investigate, understand, and possibly mitigate the HLLV environmental impacts was developed.« less
Defense Standardization Program Journal, April/Jun 2007
2007-06-01
Delivers Far-Reaching Standardization 9 Air Force Cyber Warfare Training 14 DMSMS Working Group Reaches Out to Programs 18 An Effects-Based Metrics...defend- ers their first 10 cyber warfare combat "sorties" and prepared them for net- work crew positions. Four MAJCOMs participated in BD 2002.The Air
Formulation of consumables management models. Consumables flight planning worksheet utilization
NASA Technical Reports Server (NTRS)
Newman, C. M.
1977-01-01
The updated and reformatted consumables flight planning worksheet is documented. An instruction set for applying the worksheet, and a sample application of the worksheet is disclosed. The particular application is for the STS interfacing with sortie payloads and typifies the interfacing of the delivery system and payloads.
Immersive environment technologies for planetary exploration with applications for mixed reality
NASA Technical Reports Server (NTRS)
Wright, J.; Hartman, F.; Cooper, B.
2002-01-01
Immersive environments are successfully being used to support mission operations at JPL. This technology contributed to the Mars Pathfinder Mission in planning sorties for the Sojourner rover. Results and operational experiences with these tools are being incorporated into the development of the second generation of mission planning tools.
Predicting long-term forest development following hemlock mortality
Jennifer C. Jenkins; Charles D. Canham; Paul K. Barten
2000-01-01
The hemlock woolly adelgid (Adelges tsugae Annand.), an introduced pest specializing on eastern hemlock (Tsuga canadensis (L.) Carr.), threatens to cause widespread hemlock mortality in New England forests. In this study, we used a stem-based model of forest dynamics (SORTIE) to predict forest development in a northeastern forest...
Improving performance through concept formation and conceptual clustering
NASA Technical Reports Server (NTRS)
Fisher, Douglas H.
1992-01-01
Research from June 1989 through October 1992 focussed on concept formation, clustering, and supervised learning for purposes of improving the efficiency of problem-solving, planning, and diagnosis. These projects resulted in two dissertations on clustering, explanation-based learning, and means-ends planning, and publications in conferences and workshops, several book chapters, and journals; a complete Bibliography of NASA Ames supported publications is included. The following topics are studied: clustering of explanations and problem-solving experiences; clustering and means-end planning; and diagnosis of space shuttle and space station operating modes.
Medical Language Processing for Knowledge Representation and Retrievals
Lyman, Margaret; Sager, Naomi; Chi, Emile C.; Tick, Leo J.; Nhan, Ngo Thanh; Su, Yun; Borst, Francois; Scherrer, Jean-Raoul
1989-01-01
The Linguistic String Project-Medical Language Processor, a system for computer analysis of narrative patient documents in English, is being adapted for French Lettres de Sortie. The system converts the free-text input to a semantic representation which is then mapped into a relational database. Retrievals of clinical data from the database are described.
A New Baseline for Chronic Fatigue: Why Measuring Flight Time Is the Wrong Approach
2013-04-01
crew is shown to report fully or nearly fully effective for the following sortie despite their harrowing schedule. (Table 3) Flyawake Results...Journal of Psychology, July 1948: 13. Svan, Jennifer H. "Air Force Changes Deployments Lengths for Some 42,000 Airmen." Stars and Stripes, September 16
From Our President. Scuds, Sorties, and Yellow Ribbons: The Costs of War for Children.
ERIC Educational Resources Information Center
Hostetler, Lana
1991-01-01
Maintains that early childhood professionals must confront the challenges of alleviating children's fears about the Persian Gulf War. Topics addressed include emotional support for children with parents stationed in the Gulf; effects of the media's war coverage on children; and fiscal and human costs of the war. (BB)
The role of man in flight experiment payload missions. Volume 2: Appendices
NASA Technical Reports Server (NTRS)
Malone, T. B.
1973-01-01
In the study to determine the role of man in Sortie Lab operations, a functional model of a generalized experiment system was developed. The results are presented of a requirements analysis which was conducted to identify performance requirements, information requirements, and interface requirements associated with each function in the model.
Johnson Space Center's Risk and Reliability Analysis Group 2008 Annual Report
NASA Technical Reports Server (NTRS)
Valentine, Mark; Boyer, Roger; Cross, Bob; Hamlin, Teri; Roelant, Henk; Stewart, Mike; Bigler, Mark; Winter, Scott; Reistle, Bruce; Heydorn,Dick
2009-01-01
The Johnson Space Center (JSC) Safety & Mission Assurance (S&MA) Directorate s Risk and Reliability Analysis Group provides both mathematical and engineering analysis expertise in the areas of Probabilistic Risk Assessment (PRA), Reliability and Maintainability (R&M) analysis, and data collection and analysis. The fundamental goal of this group is to provide National Aeronautics and Space Administration (NASA) decisionmakers with the necessary information to make informed decisions when evaluating personnel, flight hardware, and public safety concerns associated with current operating systems as well as with any future systems. The Analysis Group includes a staff of statistical and reliability experts with valuable backgrounds in the statistical, reliability, and engineering fields. This group includes JSC S&MA Analysis Branch personnel as well as S&MA support services contractors, such as Science Applications International Corporation (SAIC) and SoHaR. The Analysis Group s experience base includes nuclear power (both commercial and navy), manufacturing, Department of Defense, chemical, and shipping industries, as well as significant aerospace experience specifically in the Shuttle, International Space Station (ISS), and Constellation Programs. The Analysis Group partners with project and program offices, other NASA centers, NASA contractors, and universities to provide additional resources or information to the group when performing various analysis tasks. The JSC S&MA Analysis Group is recognized as a leader in risk and reliability analysis within the NASA community. Therefore, the Analysis Group is in high demand to help the Space Shuttle Program (SSP) continue to fly safely, assist in designing the next generation spacecraft for the Constellation Program (CxP), and promote advanced analytical techniques. The Analysis Section s tasks include teaching classes and instituting personnel qualification processes to enhance the professional abilities of our analysts as well as performing major probabilistic assessments used to support flight rationale and help establish program requirements. During 2008, the Analysis Group performed more than 70 assessments. Although all these assessments were important, some were instrumental in the decisionmaking processes for the Shuttle and Constellation Programs. Two of the more significant tasks were the Space Transportation System (STS)-122 Low Level Cutoff PRA for the SSP and the Orion Pad Abort One (PA-1) PRA for the CxP. These two activities, along with the numerous other tasks the Analysis Group performed in 2008, are summarized in this report. This report also highlights several ongoing and upcoming efforts to provide crucial statistical and probabilistic assessments, such as the Extravehicular Activity (EVA) PRA for the Hubble Space Telescope service mission and the first fully integrated PRAs for the CxP's Lunar Sortie and ISS missions.
2010-09-15
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett
2010-09-15
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett
2010-09-16
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair at a hotel in Cape Canaveral, Fla., to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The first part of the job fair took place Sept. 15 in Kennedy's Operations Support Building II and Space Station Processing Facility. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Jack Pfaller
2010-09-15
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett
2010-09-16
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair at a hotel in Cape Canaveral, Fla., to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The first part of the job fair took place Sept. 15 in Kennedy's Operations Support Building II and Space Station Processing Facility. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Jack Pfaller
2010-09-16
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair at a hotel in Cape Canaveral, Fla., to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The first part of the job fair took place Sept. 15 in Kennedy's Operations Support Building II and Space Station Processing Facility. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Jack Pfaller
2010-09-15
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett
2010-09-15
CAPE CANAVERAL, Fla. -- NASA's Kennedy Space Center and Brevard Workforce host a job fair in Kennedy's Operations Support Building II and Space Station Processing Facility to help center employees with future planning and placement as the Space Shuttle Program comes to an end. Recruiters included federal, state and local government agencies and organizations, as well as private companies from across the country. The second part of the job fair is scheduled for Sept. 16 at a hotel in Cape Canaveral, Fla. Kennedy's Human Resources Office also has hosted workshops, seminars and other events to prepare employees as much as possible for future opportunities. Photo credit: NASA/Kim Shiflett
NASA'S second decade in space.
NASA Technical Reports Server (NTRS)
Manganiello, E. J.
1972-01-01
Advances in space science during the last decade are reviewed. The basic scientific goals of NASA's Planetary Program are to increase man's understanding of the origin and evolution of the solar system, the origin and evolution of life, and the earth, through a comparative study of the other planets. Studies of the planets will be continued during the second decade. Aspects of manned space flights are discussed, giving attention to the Skylab workshop, and the Space Shuttle. The applications program is divided into four major areas including meteorology, communications and navigation, geodesy, and earth resources. Areas of aeronautical research are also examined.
Ways of Knowing in Doctoral Examination: How Well Is the Doctoral Regime?
ERIC Educational Resources Information Center
Lovat, Terence; Holbrook, Allyson; Bourke, Sid
2008-01-01
The article draws on findings from the "PhD Examination Project" at the SORTI Research Centre of The University of Newcastle, Australia. It focuses on an analysis of the roles of examiner and supervisor, in relation to the candidate, as seen through the lens of Habermas's "Ways of Knowing" theory. On the basis of this, it has…
2008-01-01
130, etc), the option to re-engine or place winglets on the wings of TACAIR aircraft does not exist. Bio-fuel is not an option for aviation35 and...TACAIR aircraft can not use alternative fuels, re-engine their aircraft, install winglets , or adjust their sortie lengths in an effort to reduce jet
Lyons, Terence J; Ercoline, William; O'Toole, Kevin; Grayson, Kevin
2006-07-01
Previous studies have determined that spatial disorientation (SD) causes 0.5-23% of aircraft crashes, but SD-related crash and fatality rates in different aircraft types have not been systematically studied. SD crashes for the fiscal years 1990 to 2004 and aircraft sortie numbers for all U.S. Air Force (USAF) aircraft were obtained from the USAF Safety Center. Contingency table analysis and Chi-squared tests were used to evaluate differences in SD rates. SD accounted for 11% of USAF crashes with an overall rate of 2.9 per million sorties and a crash fatality rate of 69%. The SD rate was higher in fighter/attack aircraft and helicopters than in training and transport aircraft. The risk of SD was increased at night with 23% of night crashes being caused by SD. But the SD rate and crash fatality rate were not higher in single-crewmember aircraft. SD risk is significantly increased in helicopters and fighter/attack aircraft and at night. The data suggest that a second crewmember does not protect against SD. Further study of specific SD scenarios could lead to focused interventions for SD prevention.
2005 NASA Seal/Secondary Air System Workshop, Volume 1
NASA Technical Reports Server (NTRS)
Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)
2006-01-01
The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.
NASA Astrophysics Data System (ADS)
Washington-Allen, R. A.; Fatoyinbo, T. E.; Ribeiro, N. S.; Shugart, H. H.; Therrell, M. D.; Vaz, K. T.; von Schill, L.
2006-12-01
A workshop titled: Environmental Remote Sensing for Natural Resources Management was held from June 12 23, 2006 at Eduardo Mondlane University in Maputo Mozambique. The workshop was initiated through an invitation and pre-course evaluation form to interested NGOs, universities, and government organizations. The purpose of the workshop was to provide training to interested professionals, graduate students, faculty and researchers at Mozambican institutions on the research and practical uses of remote sensing for natural resource management. The course had 24 participants who were predominantly professionals in remote sensing and GIS from various NGOs, governmental and academic institutions in Mozambique. The course taught remote sensing from an ecological perspective, specifically the course focused on the application of new remote sensing technology [the Shuttle Radar Topography Mission (SRTM) C-band radar data] to carbon accounting research in Miombo woodlands and Mangrove forests. The 2-week course was free to participants and consisted of lectures, laboratories, and a field trip to the mangrove forests of Inhaca Island, Maputo. The field trip consisted of training in the use of forest inventory techniques in support of remote sensing studies. Specifically, the field workshop centered on use of Global Positioning Systems (GPS) and collection of forest inventory data on tree height, structure [leaf area index (LAI)], and productivity. Productivity studies were enhanced with the teaching of introductory dendrochronology including sample collection of tree rings from four different mangrove species. Students were provided with all course materials including a DVD that contained satellite data (e.g., Landsat and SRTM imagery), ancillary data, lectures, exercises, and remote sensing publications used in the course including a CD from the Environmental Protection Agency's Environmental Photographic Interpretation Center's (EPA-EPIC) program to teach remote sensing and data CDs from NASA's SAFARI 2000 field campaign. Nineteen participants evaluated the effectiveness of the course in regards to the course lectures, instructors, and the field trip. Future workshops should focus more on the individual projects that students are engaged with in their jobs, replace the laboratories computers with workstations geared towards computer intensive image processing software, and the purchase of field remote sensing instrumentation for practical exercises.
The Affording Mars Workshop: Background and Recommendations
NASA Technical Reports Server (NTRS)
Thronson, Harley A.; Carberry, Christopher
2014-01-01
A human mission to Mars is the stated "ultimate" goal for NASA and is widely believed by the public to be the most compelling destination for America's space program. However, widely cited enormous costs - perhaps as much as a trillion dollars for a many-decade campaign - seem to be an impossible hurdle, although political and budget instability over many years may be equally challenging. More recently, a handful of increasingly detailed architectures for initial Mars missions have been developed by commercial companies that have estimated costs much less than widely believed and roughly comparable with previous major human space flight programs: the Apollo Program, the International Space Station, and the space shuttle. Several of these studies are listed in the bibliography to the workshop report. As a consequence of these new scenarios, beginning in spring, 2013 a multiinstitutional planning team began developing the content and invitee list for a winter workshop that would critically assess concepts, initiatives, technology priorities, and programmatic options to reduce significantly the costs of human exploration of Mars. The output of the workshop - findings and recommendations - would be presented in a number of forums and discussed with national leaders in human space flight. It would also be made available to potential international partners. This workshop was planned from the start to be the first in a series. Subsequent meetings, conferences, and symposia will concentrate on topics not able to be covered in December. In addition, to make progress in short meeting, a handful of ground rules were adopted by the planning team and agreed to by the participants. Perhaps the two most notable such ground rules were (1) the Space Launch System (SLS) and Orion would be available during the time frame considered by the participants and (2) the International Space Station (ISS) would remain the early linchpin in preparing for Mars exploration over the coming decade. The workshop was organized around three topical breakout sessions: 1. The ISS and the path to Mars: The critical coming decade 2. Affordability and sustainability: what does it mean and what are its implications within guidelines established at the start of the workshop? 3. Notional sequence(s) of cost-achievable missions for the 2020s to 2030s, including capability objectives at each stage and opportunities for coordinated robotic partnerships.
Triple Track: A New Paradigm for Developing Air Force Officers
2017-03-06
multiple career fields, including aircraft maintenance, command and control, engineering , modeling analysis, joint targeting, program management...the opportunity for an engineering job because he was too critical in his career field. The member ultimately left the service.41 Critical manning...manpower, and officer training. Over the course of her career , she was responsible for generating over 956 C-130 aircraft sorties, led interagency efforts
Analysis of Navy Joint Contingency Contracting
2011-12-01
MacLaren, RDML Crean, and CAPT Bailey for accepting our request for an interview, sharing their experiences, and providing us valuable insight into DoD... CAPT Kenneth McKinley, ―two Navy aircraft carriers support 45% of all Afghan sorties without contractors.‖35... CAPT Kenneth McKinley, the Deputy Assistant Secretary of the Navy for Research and Development and Acquisitions, in discussion with LCDR Garcia and LCDR
NASA Technical Reports Server (NTRS)
1979-01-01
Candidate power module confugurations which will directly support an evolutionary scenario allowing growth from 25 kW to 100 kW are described. The growth rationale is structured to support a nominal scenario for sortie mission support to the POrbiter and to free-flying payloads during the 1983 to 1990 era.
Assessment of the DoD Embedded Media Program
2004-09-01
Classified and Sensitive Information ................... VII-22 3. Weapons Systems Video, Gun Camera Video, and Lipstick Cameras...Weapons Systems Video, Gun Camera Video, and Lipstick Cameras A SECDEF and CJCS message to commanders stated, “Put in place mechanisms and processes...of public communication activities.”126 The 10 February 2003 PAG stated, “Use of lipstick and helmet-mounted cameras on combat sorties is approved
What Just Happened? A Historical Evaluation of Project CHECO
2013-06-01
completing their complement of combat sorties over Vietnam. For example, Captain Leo Vining 49...to eliminate jungle cover, concealment, and sanctuaries around key LOCs and fire-bases and second, to destroy the crops providing sustenance to the...Geography on Air Operations in SEA Seig, Louis 11-Jun-70 57 172 U Forward Airfields for Tactical Airlift in SEA Johnson, Leo J. Lippincott, Louis
NASA Office of Aeronautics and Space Technology Summer Workshop. Volume 4: Power technology panel
NASA Technical Reports Server (NTRS)
1975-01-01
Technology requirements in the areas of energy sources and conversion, power processing, distribution, conversion, and transmission, and energy storage are identified for space shuttle payloads. It is concluded that the power system technology currently available is adequate to accomplish all missions in the 1973 Mission Model, but that further development is needed to support space opportunities of the future as identified by users. Space experiments are proposed in the following areas: power generation in space, advanced photovoltaic energy converters, solar and nuclear thermoelectric technology, nickel-cadmium batteries, flywheels (mechanical storage), satellite-to-ground transmission and reconversion systems, and regenerative fuel cells.
Hamilton, David B.; Andrews, Austin K.; Auble, Gregor T.; Ellison, Richard A.; Farmer, Adrian H.; Roelle, James E.
1985-01-01
In the early 1960's, the National Aeronautics and Space Administration (NASA) began purchasing 140,000 acres on Merritt Island, Florida, in order to develop a center for space exploration. Most of this land was acquired to provide a safety and security buffer around NASA facilities. NASA, as the managing agency for the Kennedy Space Center (KSC), is responsible for preventing or controlling environmental pollution from the Federal facilities and activities at the Space Center and is committed to use all practicable means to protect and enhance the quality of the surrounding environment. The Merritt Island National Wildlife Refuge was established in 1963 when management authority for undeveloped lands at KSC was transferred to the U.S. Fish and Wildlife Service. In addition to manage for 11 Federally-listed threatened and endangered species and other resident and migratory fish and wildlife populations, the Refuge has comanagement responsibility for 19,000 acres of mosquito control impoundments and 2,500 acres of citrus groves. The Canaveral National Seashore was developed in 1975 when management of a portion of the coastal lands was transferred from NASA to the National Park Service. This multiagency jurisdiction on Merritt Island has resulted in a complex management environment. The modeling workshop described in this report was conducted May 21-25, 1984, at the Kennedy Space Center to: (1) enhance communication among the agencies with management responsibilities on Merritt Island; (2) integrate available information concerning the development, management, and ecology of Merritt Island; and (3) identify key research and monitoring needs associated with the management and use of the island's resources. The workshop was structured around the formulation of a model that would simulate primary management and use activities on Merritt Island and their effects on upland, impoundment, and estuarine vegetation and associated wildlife. The simulation model is composed of four connected submodels. The Uplands submodel calculates changes in acres and structural components of vegetation communities resulting from succession, fire, facilities development, and shuttle launch depositions, as well as the quantity and quality of surface runoff and aquifer input to an impoundment and an estuary. The Impoundment submodel next determines water quality and quantity and changes in vegetation resulting from water level manipulation and prescribed burning. The Estuary submodel than determines water quality parameters and acres of seagrass beds. Finally, the Wildlife submodel calculates habitat suitability indices for key species of interest, based on vegetation conditions in the uplands and impoundments and on several hydrologic parameters. The model represents a hypothetical management unit with 2,500 acres of uplands, a 600-acre impoundment, and a 1,500-acre section of estuary. Two management scenarios were run to analyze model behavior. The scenarios differ in the frequency of shuttle launches and prescribed burning, the extent of facilities development, the amount of land disposed waste material applied, and the nature and timing of impoundment water level control. Early in a model development project, the process of building the model is usually of greater benefit than the model itself. The model building process stimulates interaction among agencies, assists in integrating existing information, and helps identify research needs. These benefits usually accrue even in the absence of real predictive power in the resulting model. Open communication occurs among the Federal, State, and local agencies involved with activities on Merritt Island and the agencies have a cooperative working relationship. The workshop provided an opportunity for all of these agencies to meet at one time and have focused discussions on the key environmental and multiagency resource management issues. The workshop framework helped to integrate information and assumptions from a number of disciplines and agencies. This integration occurred in the computer simulation model and among workshop participants as submodel linkages were developed and scenario results discussed. A number of research needs were identified at the workshop during the model building and testing exercises and associated discussions. These needs were based on the informed judgement of researchers and managers familiar with Merritt Island or similar areas, rather than on a comprehensive literature review of sensitivity analysis of the preliminary model developed at the workshop. Some of the needs can be addressed by interpreting the results of completed studies from similar geographic areas as they relate to Merritt Island, while other will require additional research studies on Merritt Island. Major research needs associated with the Upland submodel include behavior of the near-surface aquifer, factors limiting slash pine regeneration, frequency and effects of natural fire on various cover types, cumulative effects of shuttle launches, and fate in upland soils of nitrogen and phosphorous from land applied waste material. Key Impoundment submodel needs include documentation of vegetation changes in response to altered water depth, salinity, and nutrient concentrations and better specification of the functional characteristics of impoundments as chemical filters. Important information gaps identified in the Estuary submodel include a more complete analysis of factors contributing to phytoplankton abundance, evaluation of sources of turbidity other than phytoplankton, and identification and quantification of factors limiting seagrass distribution. Primary research needs associated with the Wildlife submodel include a survey of breeding habitat, production data, and harvest data for mottled ducks; data on the emigration and immigration of juvenile mullet (and other transient fish) in the impoundment; the contribution of various seagrasses to habitat requirements of sea trout; and the effects of dissolved oxygen on survival of juvenile sea trout. Ideally, the modeling workshop process is iterative in nature. Periods between workshops are used for research, data collection, and model refinement. Each workshop integrates information collected since the last workshop and produces a more credible model that is more useful in evaluating management alternatives. Participants felt that continued application of this process would help provide ongoing integration and communication among agencies and would allow each agency's planning and management activities to be viewed within the context of an overall assessment.
Forecasting Demand for KC-135 Sorties: Deploy to Dwell Impacts
2013-06-01
fighter movements from individual units are rampant (6 OSS/ OSOS , 2013). However, TACC directed missions in this category are scarce, if not non...existent (6 OSS/ OSOS , 2013). Recent TACC tasked missions that appear to support CONUS fighter movements were training related: pre-deployment preparation...and large scale exercises directed by the Joint Staff (6 OSS/ OSOS , 2013). Anecdotal evidence that AMC supports CONUS fighter movements was flawed
CV-22 Human Vibration Evaluation
2008-04-01
for comfort and health risk based on the standard guidelines . The overall rating for comfort was marginal. The overall rating for health risk was... guidelines . Data were collected on one day during two sorties. At all three stations, the majority of flight test conditions were estimated to be...fairly uncomfortable” according to the ISO 2631-1: 1997 guidelines , which are independent of time. Based on this assessment, the overall rating for
NASA Technical Reports Server (NTRS)
1975-01-01
Information used in identifying representative Manned Maneuvering Unit (MMU) from the many Automated and Sortie Payloads and orbiter subsystems is presented. Representative missions were selected to represent typical MMU applications across all payloads and orbiter subsystems. Data analysis sheets are provided with other applicable information. Calculations used in defining MMU general performance and control requirements to satisfy eleven space missions are included.
United States Marine Corps Aerial Refueling Requirements Analysis
2000-12-01
REFUELING REQUIREMENTS ANALYSIS William R. Gates Systems Management Department Naval Postgraduate School 555 Dyer Road, Room 229 Monterey, CA 93943...refueling customers . KC130s are rotated through the track 24 hours per day, providing customers fuel as needed. KC130 sorties are scheduled to reflect the...projected average customer (aircraft) arrival rates, average service times (time required to engage the drogue, receive fuel and 1075 Report Documentation
NASA Technical Reports Server (NTRS)
Remsberg, Ellis E.
2011-01-01
The National Aeronautics and Space Administration (NASA) phased down its Apollo Moon Program after 1970 in favor of a partly reusable Space Shuttle vehicle that could be used to construct and supply a manned, Earth-orbiting Space Station. Applications programs were emphasized in response to the growing public concern about Earth's finite natural resources and the degradation of its environment. Shortly thereafter, a workshop was convened in Norfolk, Virginia, on Remote Measurement of Pollution (or RMOP), and its findings are in a NASA Special Publication (NASA SP-285). The three primary workshop panels and their chairmen were focused on trace gas species (Will Kellogg), atmospheric particulates or aerosols (Verner Suomi), and water pollution (Gifford Ewing). Many of the workshop participants were specialists in the techniques that might be employed for the regional to global-scale, remote measurements from an Earth-orbiting satellite. The findings and recommendations of the RMOP Report represent the genesis of and a blueprint for the satellite, atmospheric sensing programs within NASA for nearly two decades. This paper is a brief, 40-year retrospective of those instrument developments that were an outgrowth of the RMOP activity. Its focus is on satellite measurement capabilities for temperature and gaseous species that were demonstrated by atmospheric technologists at the Langley Research Center. Limb absorption by solar occultation, limb infrared radiometry, and gas filter correlation radiometry techniques provided significant science data, so they are emphasized in this review.
Early Results from NASA's Assessment of Satellite Servicing
NASA Technical Reports Server (NTRS)
Thronson, Harley A.; Reed, Benjamin B.; Townsend, Jacqueline A.; Ahmed, Mansoor; Whipple, Arthur O.; Oegerle, William R.
2010-01-01
Following recommendations by the NRC, NASA's FY 2008 Authorization Act and the FY 2009 and 2010 Appropriations bills directed NASA to assess the use of the human spaceflight architecture to service existing/future observatory-class scientific spacecraft. This interest in satellite servicing, with astronauts and/or with robots, reflects the success that NASA achieved with the Shuttle program and HST on behalf of the astronomical community as well as the successful construction of ISS. This study, led by NASA GSFC, will last about a year, leading to a final report to NASA and Congress in autumn 2010. We will report on its status, results from our March satellite servicing workshop, and recent concepts for serviceable scientific missions.
International Workshop on Stratospheric Aerosols: Measurements, Properties, and Effects
NASA Technical Reports Server (NTRS)
Pueschel, Rudolf F. (Editor)
1991-01-01
Following a mandate by the International Aerosol Climatology Program under the auspices of International Association of Meteorology and Atmospheric Physics International Radiation Commission, 45 scientists from five nations convened to discuss relevant issues associated with the measurement, properties, and effects of stratospheric aerosols. A summary is presented of the discussions on formation and evolution, transport and fate, effects on climate, role in heterogeneous chemistry, and validation of lidar and satellite remote sensing of stratospheric aerosols. Measurements are recommended of the natural (background) and the volcanically enhanced aerosol (sulfuric acid and silica particles), the exhaust of shuttle, civil aviation and supersonic aircraft operations (alumina, soot, and ice particles), and polar stratospheric clouds (ice, condensed nitric and hydrochloric acids).
NASA Technical Reports Server (NTRS)
Henderson, F. B. (Editor); Rock, B. N. (Editor)
1983-01-01
Consideration is given to: the applications of near-infrared spectroscopy to geological reconnaissance and exploration from space; imaging systems for identifying the spectral properties of geological materials in the visible and near-infrared; and Thematic Mapper (TM) data analysis. Consideration is also given to descriptions of individual geological remote sensing systems, including: GEO-SPAS; SPOT; the Thermal Infrared Multispectral Scanner (TIMS); and the Shuttle Imaging Radars A and B (SIR-A and SIR-B). Additional topics include: the importance of geobotany in geological remote sensing; achromatic holographic stereograms from Landsat MSS data; and the availability and applications of NOAA's non-Landsat satellite data archive.
NASA Technical Reports Server (NTRS)
1983-01-01
The history of NASA's materials processing in space activities is reviewed. Market projections, support requirements, orbital operations issues, cost estimates and candidate systems (orbiter sortie flight, orbiter serviced free flyer, space station, space station serviced free flyer) for the space production of semiconductor crystals are examined. Mission requirements are identified for materials processing, communications missions, bioprocessing, and for transferring aviation maintenance training technology to spacecraft.
1985-07-01
pollutant emissions for flight activities over the proposed range (grams of pollutant per sortie)a Carbon Unburned Oxides of Particulates Oxides Aircraft...Table 4.4. HUD site acceptability standards ... ........... .. 55 Table 4.5. Predicted pollutant emissions for flight activties over the proposed range...matter, carbon monoxide, hydrocarbons, oxides of nitrogen, and oxides of sulfur to the regional pollution levels, but because of the amounts emitted and
Defining Time: The Argument for a Paradigm Shift in Air Force Thinking
2013-04-03
the ability to effectively cope with unique mental stressors and challenges needed to ensure mission readiness,” adding, “A servicemember’s family’s...nuclear sorties since it supports the higher level priority.28 In order to allow maximum flexibility , as well as the most effective ...and a continuing reduction in the Total Force planned through 2017, the Air Force must manage all of its resources effectively and efficiently
Simulation of Autonomic Logistics System (ALS) Sortie Generation
2003-03-01
84 Appendix B. ANOVA Assumptions Mission Capable Rate ANOVA Assumptions Constant Variance SSR # X cols SSE n Breusch - Pagan Chi-square 3.57E...85 Flying Scheduling Effectiveness ANOVA Assumptions Constant Variance SSR # X cols SSE n Breusch - Pagan Chi-square 2.12E-10 3 0.000816 270...Constant Variance SSR # X cols SSE n Breusch - Pagan Chi-square 1.86E-09 3 0.003758 270 3.20308814 0.9556957 Independence Durbin-Watson
2012-08-01
include the tactical delivery of air-to-ground munitions, laser designation of targets from ground and airborne platforms, and threat evasion. These...world events, which include the tactical delivery of air-to-ground munitions, laser designation of targets from ground and airborne platforms, and...Closure CAA Clean Air Act CAU Classic Associate Unit CEQ Council on Environmental Quality CFR Code of Federal Regulations CO carbon monoxide
Solar System Studies with the Space Infrared Telescope Facility (SIRTF)
NASA Technical Reports Server (NTRS)
Cruikshank, Dale P.; DeVincenzi, Donald L. (Technical Monitor)
1998-01-01
SIRTF (Space Infrared Telescope Facility) is the final element in NASA's 'Great Observatories' program. It consists of an 85-cm cryogenically-cooled observatory for infrared astronomy from space. SIRTF is scheduled for launch in late 2001 or early 2002 on a Delta rocket into a heliocentric orbit trailing the Earth. Data from SIRTF will be processed and disseminated to the community through the SIRTF Science Center (SSC) located at the Infrared Processing and Analysis Center (IPAC) at Caltech. Some 80/% of the total observing time (estimated at a minimum of 7500 hours of integration time per year for the mission lifetime of about 4 years) will be available to the scientific community at large through a system of refereed proposals. Three basic instruments are located in the SIRTF focal plane. The Multiband Imaging Photometer (MIPS), the Infrared Array Camera (IRAC), and the Infrared Spectrometer (IRS), taken together, provide imaging and spectroscopy from 3.5 to 160 microns. Among the solar system studies suited to SIRTF are the following: 1) spectroscopy and radiometry of small bodies from the asteroid main belt, through the Trojan clouds, to the Kuiper Disk; 2) dust distribution in the zodiacal cloud and the Earth's heliocentric dust ring; 3) spectroscopy and radiometry of comets; and 4) spectroscopy and radiometry of planets and their satellites. Searches for, and studies of dust disks around other stars, brown dwarfs, and superplanets will also be conducted with SIRTF. The SORTIE web site (http://ssc.ipac.caltech.edu/sirtf) contains important details and documentation on the project, the spacecraft, the telescope, instruments, and observing procedures. A community-wide workshop for solar system studies with SIRTF is in the planning stages by the author and Martha S. Hanner for the summer of 1999.
Laundry Study for a Lunar Outpost
NASA Technical Reports Server (NTRS)
Ewert, Michael; Jeng, Frank
2009-01-01
In support of the Constellation Program, which will return humans to the moon and establish an Outpost, NASA has conducted an analysis of crew clothing and laundry options. Single-use or "disposable" clothing has been used from Apollo until International Space Station (ISS) missions, meaning that clothes were worn for the whole mission or thrown away when they became too dirty to wear any longer. This is justified for short duration missions; however, as the Constellation mission will last much longer and each individual Outpost mission is expected to last up to 180 days, mission goals and launch penalties for mass and volume may lead to a different conclusion. Furthermore, the habitat atmosphere pressure and therefore oxygen volume percentage will be different from ISS or Shuttle. Almost daily EVA sorties will be a norm during Outpost exploration missions. All of these factors will have impacts on selection of crew clothing and laundry options for Outpost missions. Mass and volume estimates for disposable crew clothing have been shown as a major penalty in long-duration manned space exploration missions in previous analyses. Assuming disposable clothing like ISS, Equivalent System Mass (ESM) of crew clothing and hygiene towels was estimated to be 11,000 kg or about 11% of total life support system ESM for a 10-year Lunar Outpost mission with 4 crew members. Ways to reduce this clothing penalty, which are discussed in this paper, include: a) Reduce clothing supply rate through using clothes made of advanced fabrics; b) Reduce daily usage rate by extending its use duration before disposing; and c) Use laundry and reusable clothing. The report summarizes recent research efforts in advanced clothing, proposed clothing supply rates for Exploration missions, results of a trade-off study between disposable clothing and laundry, and conclusions and suggestions for Constellation Program clothing.
Constellation Program Life-cycle Cost Analysis Model (LCAM)
NASA Technical Reports Server (NTRS)
Prince, Andy; Rose, Heidi; Wood, James
2008-01-01
The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.
Survey of On-Orbit Sleep Quality: Short-Duration Flyers
NASA Technical Reports Server (NTRS)
Locke, J.; Leveton, L.; Keeton, K.; Whitmire, A.; Patterson, H.; Faulk, J.
2010-01-01
The NASA Human Research Program (HRP) Behavioral Health and Performance Element (BHP), in conjunction with the NASA Space Medicine Division, is currently completing the largest systematic, subjective assessment of shuttle astronauts sleep behaviors and sleep quality on Earth, during training periods, and during space flight missions. Since July 2009, a total of 66 astronauts have completed a secure online survey regarding specific sleep strategies, crew policies, and mitigation effectiveness. In addition to the survey, each astronaut participant met individually with trained BHP and SD representatives for a structured, follow-up interview. Data are currently being assessed and the study s principal investigator will be providing some preliminary findings at the Investigators Workshop. Additional analyses will be conducted in the following months to examine predictors of optimal sleep in space, and to evaluate the differences in countermeasure effectiveness between groups based on their sleep experience on the ground and on orbit. A revised survey for a subsequent investigation on the experiences of long-duration flyers will be developed in the Spring and implemented in the Summer of 2010. Findings from both of these investigations will inform countermeasure strategies for astronauts, medical operations, and habitat designers for future exploration missions, as well as upcoming shuttle and ISS missions.
Gulf War Air Power Survey. Volume 1. Planning and Command and Control
1993-01-01
should not simply pressure Saddam to pull out of Kuwait. Rather, it should continue until the Iraq army was destroyed. [DELET] m Schwa’rkopf. too, wanted...who pulled the OwAps sortie database into shape; retired Col. Donald A. Kellum, who uncovered the full story of close air support from records at Shaw...the maturing capability of airborne, decentralized command and control. Chapter 10 pulls all the chapters together around the distinction introduced
High Fidelity VSF Measurements and Inversion for RaDyO (Hi Fi RaDyO)
2007-09-30
0.025 um size; this time with all WLE ECO BB sensors as well. ployment in Hawaii (SORTIE) 21-28: Deployment in northwest Atlantic (OCVAL: Endeavor...between phytoplankton pigment composition and in situ spectral absorption measurements in East Sound, Orcas , Island, WA. Limnol. Oceanogr., 48:632-646...concentration and optical properties of surface waters in the South East Pacific and Atlantic Oceans. Biogeosciences, in review. Twardowski, M.S., H
65. March 1978. Copy of enlargement from original 11Omm blackandwhite ...
65. March 1978. Copy of enlargement from original 11Omm black-and-white aerial negative from Sortie 414, made by United States Air Force, Tactical Reconaissance Wing, Ninth Air Force, at Shaw Air Force Base, Sumter, South Carolina. Overhead aerial view of Borough House with surrounding grounds and adjacent properties. - Borough House, West Side State Route 261, about .1 mile south side of junction with old Garners Ferry Road, Stateburg, Sumter County, SC
2010-09-30
planktonic ecosystems. OBJECTIVES Our objectives in this work are to 1) visualize and quantify herbivorous copepod feeding in the laboratory...and 2) to apply these methods in the field to observe the dynamics of copepod feeding in situ. In particular we intend to test the “feeding sorties...hypothesis vs. the “in situ feeding” hypothesis regarding the location and timing of copepod feeding and vertical migration. APPROACH Previous
ERIC Educational Resources Information Center
Bastide, Mario
1977-01-01
This article discusses the section of the final examination used at a regional training center in French language and literature in Morocco. The linguistics task is in the form of two tests containing language errors which an examination candidate is required to find, correct, and explain. (Text is in French.) (CLK)
2011-01-01
for each of the target shops. The primary maintenance function would be at the flightline to aid sortie generation. However, on observing that...law as indicated in a notice appearing later in this work. This electronic representation of RAND intellectual property is provided for non ...commercial use only. Unauthorized posting of RAND electronic documents to a non -RAND website is prohibited. RAND electronic documents are protected under
Food and Nutrition for the Moon Base: What we have Learned in 45 Years of Space Flight
NASA Technical Reports Server (NTRS)
Lane, Helen; Kloeris, Vickie; Perchonok, Michele; Zwart, Sara; Smith, Scott M.
2006-01-01
The United States has a new human space flight mission to return to the Moon, this time to establish an outpost to continue research there and develop our ability to send humans to Mars and bring them back in good health. The Apollo missions were the first human expeditions to the Moon. Only 2 crew members landed on the lunar surface on each Apollo mission, and they spent a maximum of 72 hours there. Future trips will have at least 4 crew members, and the initial trips will include several days of surface activity. Eventually, these short (sortie) missions will extend to longer lunar surface times, on the order of weeks. Thus, the challenges of meeting the food and nutritional needs of crew members at a lunar outpost will be significantly different from those during the early Apollo missions. The U.S. has had humans in space beginning in 1961 with increasing lengths of time in space flight. Throughout these flights, the areas of particular concern for nutrition are body mass, bone health, and radiation protection. The development and refinement of the food systems over the last 30 years are discussed, as well as the plans for both the sortie and lunar. The articles briefly review what we know today about food and nutrition for space travelers and relate this knowledge to our planned human flights back to the Moon.
Accident Precursor Analysis and Management: Reducing Technological Risk Through Diligence
NASA Technical Reports Server (NTRS)
Phimister, James R. (Editor); Bier, Vicki M. (Editor); Kunreuther, Howard C. (Editor)
2004-01-01
Almost every year there is at least one technological disaster that highlights the challenge of managing technological risk. On February 1, 2003, the space shuttle Columbia and her crew were lost during reentry into the atmosphere. In the summer of 2003, there was a blackout that left millions of people in the northeast United States without electricity. Forensic analyses, congressional hearings, investigations by scientific boards and panels, and journalistic and academic research have yielded a wealth of information about the events that led up to each disaster, and questions have arisen. Why were the events that led to the accident not recognized as harbingers? Why were risk-reducing steps not taken? This line of questioning is based on the assumption that signals before an accident can and should be recognized. To examine the validity of this assumption, the National Academy of Engineering (NAE) undertook the Accident Precursors Project in February 2003. The project was overseen by a committee of experts from the safety and risk-sciences communities. Rather than examining a single accident or incident, the committee decided to investigate how different organizations anticipate and assess the likelihood of accidents from accident precursors. The project culminated in a workshop held in Washington, D.C., in July 2003. This report includes the papers presented at the workshop, as well as findings and recommendations based on the workshop results and committee discussions. The papers describe precursor strategies in aviation, the chemical industry, health care, nuclear power and security operations. In addition to current practices, they also address some areas for future research.
NASA Technical Reports Server (NTRS)
Cowen, Benjamin
2011-01-01
Simulations are essential for engineering design. These virtual realities provide characteristic data to scientists and engineers in order to understand the details and complications of the desired mission. A standard development simulation package known as Trick is used in developing a source code to model a component (federate in HLA terms). The runtime executive is integrated into an HLA based distributed simulation. TrickHLA is used to extend a Trick simulation for a federation execution, develop a source code for communication between federates, as well as foster data input and output. The project incorporates international cooperation along with team collaboration. Interactions among federates occur throughout the simulation, thereby relying on simulation interoperability. Communication through the semester went on between participants to figure out how to create this data exchange. The NASA intern team is designing a Lunar Rover federate and a Lunar Shuttle federate. The Lunar Rover federate supports transportation across the lunar surface and is essential for fostering interactions with other federates on the lunar surface (Lunar Shuttle, Lunar Base Supply Depot and Mobile ISRU Plant) as well as transporting materials to the desired locations. The Lunar Shuttle federate transports materials to and from lunar orbit. Materials that it takes to the supply depot include fuel and cargo necessary to continue moon-base operations. This project analyzes modeling and simulation technologies as well as simulation interoperability. Each team from participating universities will work on and engineer their own federate(s) to participate in the SISO Spring 2011 Workshop SIW Smackdown in Boston, Massachusetts. This paper will focus on the Lunar Rover federate.
Government/Industry Workshop on Payload Loads Technology
NASA Technical Reports Server (NTRS)
1978-01-01
A fully operational space shuttle is discussed which will offer science the opportunity to explore near earth orbit and finally interplanetary space on nearly a limitless basis. This multiplicity of payload/experiment combinations and frequency of launches places many burdens on dynamicists to predict launch and landing environments accurately and efficiently. Two major problems are apparent in the attempt to design for the diverse environments: (1) balancing the design criteria (loads, etc.) between launch and orbit operations, and (2) developing analytical techniques that are reliable, accurate, efficient, and low cost to meet the challenge of multiple launches and payloads. This paper deals with the key issues inherent in these problems, the key trades required, the basic approaches needed, and a summary of the state-of-the-art techniques.
NASA Technical Reports Server (NTRS)
Russell, P. B.; Pfister, L.; Selkirk, H. B.
1993-01-01
An overview is presented of the tropical component of STEP. The STEP cooperative experiments are described and summaries are presented of the STEP tropical ER-2 aircraft flights. STEP tropical results on dehydration and transfer and the mechanisms of upward transfer are summarized. Illustrations show flight paths for each sortie on satellite images and on 100 hPa synoptic flow charts, as well as the timing of flights with respect to overall cloudiness in the Australian region.
Learning How to Fight Together: The British Experience with Joint Air-Land Warfare
2009-03-01
El Hamma , from 3 to 9 April, when the NATAF flew more than 3,000 sorties and dropped over ,500,000 pounds of bombs in direct support of 01...He is a senior lec- turer in the Defence Studies Department, King’s College London (KCL), based at the Joint Services Command and Staff College...and ended in stalemate 42 days later at El Alamein, some 220 miles inside the Egyp- tian border.55 A rough comparison of the opposing numbers of tanks
The Practical Assessment of Pilot Workload: Flight Mechanics Panel of AGARD
1987-06-01
tesits. The PSE, consi"n of a post-flght questionnaire and a d ~befrif interview, was zised to obtain informationt from botit pilots for each test sortie...sgetdta rasetcria voe epne eye blomink beaio otiuecmpeetr nomtions abouer plt worklo d . a nge dmntalaesety I authtor:t describen theprcia use of ths...sit d ~ymt auablnietihWtmmn &I when irvd no pant of ibjtove ratlln s. fohad( X9)4)S) n h (ec) Cane s deeine heitha wich requre visalmoitoang Tol an
TSARINA: A Computer Model for Assessing Conventional and Chemical Attacks on Airbases
1990-09-01
IV, and has been updated to FORTRAN 77; it has been adapted to various computer systems, as was the widely used AIDA model and the previous versions of...conventional and chemical attacks on sortie generation. In the first version of TSARINA [1 2], several key additions were made to the AIDA model so that (1...various on-base resources, in addition to the estimates of hits and facility damage that are generated by the original AIDA model . The second version
Realistic Bomber Training Initiative Supplemental Environmental Impact Statement
2007-03-01
mph at the surface and 27 mph at 22 feet AGL; e ) A pull-up maneuver by the B-1B, which may be executed once or twice per sortie- operation, can...avoid resources, where feasible. ( e ) Developing and implementing site-specifi.c mitigation measures, if required. (3) The Air Force will avoid or...form a complete MOA, the LancerMOA. (2) Concerns were expressed about the structw~ e of the proposed MTR, IR 178. The Air Force reduced noise
1983-01-01
SUPERSONIC FLIGHT OPERATIONS ’• I • IN THE RESERVE MILITARY OPERATIONS AREA . HOLLOMAN AFB, NE MEXICO ~~DEPARTMENT OF THE AIR FORCE I Environme nta IImpac...Force (b) Proposed Action: Supersonic Flight Operations in the Reserve Mill ary Operations Area in Catron County, New Mexico . (c) Responsible...Abstract: The 49th Tactical Fighter Wing (TFW) at Holloman AFB, New Mexico , proposes to fly approximately 200 supersonic sorties per month in the Reserve
Report of the International Ice Patrol in the North Atlantic. 1986 Season Bulletin Number 72
1986-01-01
business transac-tions from the season. Flight The Intemnational Ice Patrol Month Sooe these nhos requested that all ships transiting -Month Sorties hours...GERMANY 1 EASTERN SHELL UNKNOWN 1 EASTERN UNICORN PANAMA 1 1 ESPANA 1 FEDERAL REPUBLIC OF GERMANY 1 EUROPE BELGIUM 5 EVA FRANCE 1 1 EVERGREEN USA 15 1...when flown at 8000 ft similar pattern, but a winch failure computed using an algorithm (2438 m), maps a 50 km wide after 28 CTD stations resulted in
NASA Technical Reports Server (NTRS)
1976-01-01
A software analysis was performed of known STS sortie payload elements and their associated experiments. This provided basic data for STS payload software characteristics and sizes. A set of technology drivers was identified based on a survey of future technology needs and an assessment of current software technology. The results will be used to evolve a planned approach to software technology development. The purpose of this plan is to ensure that software technology is advanced at a pace and a depth sufficient to fulfill the identified future needs.
Unit Level WRSK (War Readiness Spares Kit) Assessment and Sortie Generation Simulation Model.
1987-12-01
also grateful to Capt. Richard Mabe and Capt. Michael Budde for teaching me the secrets of Dyna-MUTRIC. To my typist and fiancee, Marcia Rossow, thank...interviews with Capt. Budde, HQ TAC/LGY and Capt. Mabe , AFIT/LSMA (5) (21). Final agreement on the model flow took place at a meeting on 30 September...Gunter AFS, AL. 3. Arthur, Jeffrey L., James 0. Frendewey, Parviz Ghandforoush and Loren Paul Rees. "Microcomputer Simulation Systems," Computers and
2017-01-01
aircraft types. Like the project scorecard, well- designed mission outcome metrics are concrete and relatable: sorties generated, pilots graduated...systems are designed to serve functions like this. To the degree that these data can be exported and synthesized, they can be leveraged to tie to a...expectations of engineers who designed a facility, as well as end users who utilize it. A notional depiction of how asset condition changes over
The United States Air Force in Southeast Asia: Interdiction in Southern Laos, 1960-1968
1993-01-01
Tactical Sorties in Northern and Southern Laos. December 1967 .................................... 245 Charts . Tables. Diagrams Page 272 276 278...aircraft, chiefly 0-1F Bird Dogs (used mostly as FACs), T-28Ds, C-123 Blindbats, and C-123 Candlesticks . Along the Ho Chi Minh Trail, the scope...Blindbats and C-123 Candlesticks teamed with BIG EAGLE A-26Ks or USAF T-28D ZORROS (or both) to conduct the nocturnal mission^.^’ The Seventh Air Force
Cost-Effective Helicopter Options for Partner Nations
2015-01-01
sortie. As a result, several thousand performance values are required to model each alternative aircraft over a set of missions. To produce robust...available to the general public. Figure 3.6 Model Specifications RAND RR141z1-3.6 Mission-Task Outbound Inbound Start STTO Climb Cruise Land/Endure (Un)load...exception of the UH-60M. For that model , we used the value indicated in the President’s Budget rather than that indicated in the SAR;7 we did so
Mission and surface infrastructure concepts
NASA Technical Reports Server (NTRS)
Butler, J.; Mcdaniel, S. G.
1986-01-01
Several types of manned Mars surface missions, including sorties, fixed-base, and hybrid missions, which can be envisioned as potentially desirable approaches to the exploration and utilization of Mars are identified and discussed. Some of the advantages and disadvantages of each type are discussed briefly. Also, some of the implications of the types of missions on the surface elements' design are discussed briefly. Typical sets of surface elements are identified for each type of mission, and weights are provided for each element and set.
A Systems Analysis View of the Vietnam War: 1965-1972. Volume 5. The Air War
1975-02-18
effective, at least in the terms of truck kills, than our previous efforts. The table below shows attack sorties, enem truck sightings, and results...by heavy concentration of effort against anQ-bypassable choke points, the eney’a traffic flow can be interdacted effectively. Enem Truck Traffic in...following tentative conclusions. - The eneme receives about 70% of his msuplies fbr SW opera- S tions from sources inside SVW, 10% from Cambodia, and about
The Overview of the Health Monitoring Management System
NASA Astrophysics Data System (ADS)
Zhong-Ji, Tan; Zhiqiang, Zhang; Yan-Bin, Shi
The health monitoring management system has prominent function to improve the security and dependability of the aircraft, can also shortens the maintain cycle by a large margin, improves the sortie rate at the same time. This paper has explained the concept, the development in domestic and international and the key technology of the health monitoring management system of aircraft; Construct the structure of the aircraft health monitoring management system, and has carried on analysis and research to its implementation method.
NASA Technical Reports Server (NTRS)
Stutte, Gary W.; Roberts, Michael
2012-01-01
SyNRGE (Symbiotic Nodulation in a Reduced Gravity Environment) was a sortie mission on STS-135 in the Biological Research in Canisters (BRIC) hardware to study the effect of microgravity on a plant-microbe symbiosis resulting in biological nitrogen fixation. Medicago truncatula, a model species for th legume family, was inoculated with its bacterial symbiont, Sinorhizobium meliloti, to observe early biomolecular events associated with infection and nodulation in Petri Dish Fixation Units (PDFU's).
Project CHECO Southeast Asia Report. Air Operations in Northern Laos, 1 November 1970 - 1 April 1971
1971-05-03
to be of sufficient size and scope to warrant a significant increase in the daily tacair sortie rate provided by Seventh Air Force. The execution of...weather, however, delayed the operation. A last-minute change of HLZs was made by CAS, but weather and faulty execution precluded proper zone...Artillery Airborne Battlefield Command and Control Center Attacks by Fire Jtq 1£4+, .. Auto Defense du Choc . Technically an obsolete tenn now. Refers
Using Sorties vs. Flying Hours to Predict Aircraft Spares Demand
1997-04-01
the war plans, the demand for air- craft spares was substantially less than expected. This expected demand was based on the standard U.S. Air Force...by some combination of them. The Air Force’s new war plans for tactical aircraft in the 1993 USAF War and Mobilization Plan, Volume 5 (WMP-5) have...to continue to use flying hours as the basis for predicting wartime demand from peacetime experience, the cost of the war - time spares requirement
Synthetic Vision Technology Demonstration. Volume 3. Flight Tests
1993-12-01
diameter increments for the FSSP and secondary PMS probes ( PMS2 ). For each approach recorded for the sortie, general information recorded in the file... PMS2 ). This final file was given a suffix of "PM2". Each of these files contained multiple dataSit separated by commas rather than spaces. Since the...s I P1.r: 0666011 APPU0O: a TIN PMUCO(SA): 163453-164661 HTEG. PROFLE OF PMS2 RAIN RATE MTEG. PROFLE OF PROBES LWC 819092, Approach #7 MGMjs2
Environmental Control and Life Support (ECLS) Hardware Commonality for Exploration Vehicles
NASA Technical Reports Server (NTRS)
Carrasquillo, Robyn; Anderson, Molly
2012-01-01
In August 2011, the Environmental Control and Life Support Systems (ECLSS) technical community, along with associated stakeholders, held a workshop to review NASA s plans for Exploration missions and vehicles with two objectives: revisit the Exploration Atmospheres Working Group (EAWG) findings from 2006, and discuss preliminary ECLSS architecture concepts and technology choices for Exploration vehicles, identifying areas for potential common hardware or technologies to be utilized. Key considerations for selection of vehicle design total pressure and percent oxygen include operational concepts for extravehicular activity (EVA) and prebreathe protocols, materials flammability, and controllability within pressure and oxygen ranges. New data for these areas since the 2006 study were presented and discussed, and the community reached consensus on conclusions and recommendations for target design pressures for each Exploration vehicle concept. For the commonality study, the workshop identified many areas of potential commonality across the Exploration vehicles as well as with heritage International Space Station (ISS) and Shuttle hardware. Of the 36 ECLSS functions reviewed, 16 were considered to have strong potential for commonality, 13 were considered to have some potential commonality, and 7 were considered to have limited potential for commonality due to unique requirements or lack of sufficient heritage hardware. These findings, which will be utilized in architecture studies and budget exercises going forward, are presented in detail.
NASA Space Exploration Logistics Workshop Proceedings
NASA Technical Reports Server (NTRS)
deWeek, Oliver; Evans, William A.; Parrish, Joe; James, Sarah
2006-01-01
As NASA has embarked on a new Vision for Space Exploration, there is new energy and focus around the area of manned space exploration. These activities encompass the design of new vehicles such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV) and the identification of commercial opportunities for space transportation services, as well as continued operations of the Space Shuttle and the International Space Station. Reaching the Moon and eventually Mars with a mix of both robotic and human explorers for short term missions is a formidable challenge in itself. How to achieve this in a safe, efficient and long-term sustainable way is yet another question. The challenge is not only one of vehicle design, launch, and operations but also one of space logistics. Oftentimes, logistical issues are not given enough consideration upfront, in relation to the large share of operating budgets they consume. In this context, a group of 54 experts in space logistics met for a two-day workshop to discuss the following key questions: 1. What is the current state-of the art in space logistics, in terms of architectures, concepts, technologies as well as enabling processes? 2. What are the main challenges for space logistics for future human exploration of the Moon and Mars, at the intersection of engineering and space operations? 3. What lessons can be drawn from past successes and failures in human space flight logistics? 4. What lessons and connections do we see from terrestrial analogies as well as activities in other areas, such as U.S. military logistics? 5. What key advances are required to enable long-term success in the context of a future interplanetary supply chain? These proceedings summarize the outcomes of the workshop, reference particular presentations, panels and breakout sessions, and record specific observations that should help guide future efforts.
Space Bioreactor Science Workshop
NASA Technical Reports Server (NTRS)
Morrison, Dennis R. (Editor)
1987-01-01
The first space bioreactor has been designed for microprocessor control, no gaseous headspace, circulation and resupply of culture medium, and a slow mixing in very low shear regimes. Various ground based bioreactors are being used to test reactor vessel design, on-line sensors, effects of shear, nutrient supply, and waste removal from continuous culture of human cells attached to microcarriers. The small (500 ml) bioreactor is being constructed for flight experiments in the Shuttle middeck to verify systems operation under microgravity conditions and to measure the efficiencies of mass transport, gas transfer, oxygen consumption, and control of low shear stress on cells. Applications of microcarrier cultures, development of the first space bioreactor flight system, shear and mixing effects on cells, process control, and methods to monitor cell metabolism and nutrient requirements are among the topics covered.
Conceptual designs study for a Personnel Launch System (PLS)
NASA Technical Reports Server (NTRS)
Wetzel, E. D.
1990-01-01
A series of conceptual designs for a manned, Earth to Low Earth Orbit transportation system was developed. Non-winged, low L/D vehicle shapes are discussed. System and subsystem trades emphasized safety, operability, and affordability using near-term technology. The resultant conceptual design includes lessons learned from commercial aviation that result in a safe, routine, operationally efficient system. The primary mission for this Personnel Launch System (PLS) would be crew rotation to the SSF; other missions, including satellite servicing, orbital sortie, and space rescue were also explored.
1990-09-01
that work will be done at the point where Task 30000 is specified. The unscheduled on-equipment aircraft tasks are normally grouped together with the...probability events, TSAR groups together those tasks performed by the same work center or shop and selects at most one following each flighL Processing is...remainder capable only of assembling other kinds. Furthermore, the first group of personnel should be specified to be cross-trained to do the work of
Jurassic Diabase from Leesburg, VA: A Proposed Lunar Simulant
NASA Technical Reports Server (NTRS)
Taylor, Patrick T.; Lowman, P. D.; Nagihara, Seiichi; Milam, M. B.; Nakamura, Yosio
2008-01-01
A study of future lunar seismology and heat flow is being carried out as part of the NASA Lunar Sortie Science Program. This study will include new lunar drilling techniques, using a regolith simulant, for emplacement of instruments. Previous lunar simulants, such as JSC-1 and MLS-1, were not available when the study began, so a local simulant source was required. Diabase from a quarry at Leeseburg, Virginia, was obtained from the Luck Stone Corporation. We report here initial results of a petrographic examination of this rock, GSC-1 henceforth.
Jurassic Diabase from Leesburg, VA: A Proposed Lunar Simulant
NASA Technical Reports Server (NTRS)
Taylor, P. T.; Lowman, P. D.; Nagihara, Seiichi; Milam, M. B.; Nakamura, Yosio
2008-01-01
A study of future lunar seismology and heat flow is being carried out as part of the NASA Lunar Sortie Science Program [1].This study will include new lunar drilling techniques, using a regolith simulant, for emplacement of instruments. Previous lunar simulants, such as JSC-I and MLS-l, were not available when the study began, so a local simulant source was required. Diabase from a quarry at Leesburg, Virginia, was obtained from the Luck Stone Corporation. We report here initial results of a petrographic examination of this rock, GSC-1 henceforth.
2014-09-18
Erdogan , 1963). 26 Paris’s Law Under a fatigue stress regime Paris’s Law relates sub-critical crack growth to stress intensity factor. The basic...Paris and Erdogan , 1963). After takeoff, the model generates a probability distribution for the crack length in that specific sortie based on the...Law is one of the most widely used fatigue crack growth models and was used in this research effort (Paris and Erdogan , 1963). Paris’s Law Under a
2012-02-01
BASE OKLAHOMA CITY, OKLAHOMA An Environmental Assessment (EA) has been prepared to assess the potential effects on the human and natural...hangars, and associated administrative and shop areas to allow the 552d ACW to inspect, service, and maintain E-3 AWACS aircraft safely and effectively ...maintain Tinker AFB’s mission effectiveness and optimize the 552d ACW’s sortie generation rates. Implementing the Proposed Action would provide a
A Linear Programming Application to Aircrew Scheduling.
1980-06-06
1968, our total force -- Air National Guard (ANG), Air Force Reserve (AFRES), and Active duty - aircraft inventory has dropped from over 15,000...3-3) I 8 Table 2 Active Duty A-7D Training Program Level A Level B Level C Day Night Day Night Sorties WD/SATa b 22/18 6 11/6 1 9/5 Maverick 6 4/2 2...and C are listed in % LTable 5. There are additional constraints not apparent from looking at the table. First, night events listed in Table 5 are only
1986-06-06
Washington D.C.: Office of Air Force History, 1978), pp. 234, 241, 254, ?59. 3 Knaack, Post- Worl -g War 11 Fighters, p. 254. 7 CHAPTER 2 HISTORICAL...The F-IlIA in Southeast Asia: 19 Second Deployment The F-I11B 22 The F-111C 25 The F-1111 25 The F-1IE 30 The F-1I1F 33 iv...Sortie 98 3-13 Maintenance Plan / Scheduling Effectiveness 99 3-14 War Readiness Spares Kit (WRSK) Fill Rate 99 3-15 WRSK / BLSS Withdrawals 100 3-16
1999-01-01
the previous sortie. 47 Portable Maintenance Data Store (PMDS). The PMDS is a solid state memory device approximately the same size as an...Engine Titanium Consortium Portable Scanner Bridging the gap between rapid imaging and robots is a class of inspection devices called scanners...patterns on the image to change . Thus, a region approximately the size of the sensor element (3 inches in diameter) can be inspected at one time, and an
TSARINA: A computer model for assessing conventional and chemical attacks on air bases
DOE Office of Scientific and Technical Information (OSTI.GOV)
Emerson, D.E.; Wegner, L.H.
This Note describes the latest version of the TSARINA (TSAR INputs using AIDA) airbase damage assessment computer program that has been developed to estimate the on-base concentration of toxic agents that would be deposited by a chemical attack and to assess losses to various on-base resources from conventional attacks, as well as the physical damage to runways, taxiways, buildings, and other facilities. Although the model may be used as a general-purpose, complex-target damage assessment model, its primary role in intended to be in support of the TSAR (Theater Simulation of Airbase Resources) aircraft sortie generation simulation program. When used withmore » TSAR, multiple trials of a multibase airbase-attack campaign can be assessed with TSARINA, and the impact of those attacks on sortie generation can be derived using the TSAR simulation model. TSARINA, as currently configured, permits damage assessments of attacks on an airbase (or other) complex that is compassed of up to 1000 individual targets (buildings, taxiways, etc,), and 2500 packets of resources. TSARINA determines the actual impact points (pattern centroids for CBUs and container burst point for chemical weapons) by Monte Carlo procedures-i.e., by random selections from the appropriate error distributions. Uncertainties in wind velocity and heading are also considered for chemical weapons. Point-impact weapons that impact within a specified distance of each target type are classed as hits, and estimates of the damage to the structures and to the various classes of support resources are assessed using cookie-cutter weapon-effects approximations.« less
Lessons Learned During the Refurbishment and Testing of an Observatory After Long-Term Storage
NASA Technical Reports Server (NTRS)
Hawk, John; Peabody, Sharon; Stavely, Richard
2015-01-01
Thermal Fluids Analysis Workshop (TFAWS) 2015, Silver Spring, MD NCTS 21070-15. This paper addresses the lessons learned during the refurbishment and testing of the thermal control system for a spacecraft which was placed into long-term storage. The DSCOVR (Deep Space Climate Observatory) Observatory (formerly known as Triana) was originally scheduled to launch on the Space Shuttle in 2002. With the Triana spacecraft nearly complete, the mission was canceled and the satellite was abruptly put into storage in 2001. In 2008 the observatory was removed from storage to begin refurbishment and testing. Problems arose associated with hardware that was not currently manufactured, coatings degradation, and a significant lack of documentation. Also addressed is the conversion of the thermal and geometric math models for use with updated thermal analysis software tools.
An electrostatic 3-phase linear stepper motor fabricated by vertical trench isolation technology
NASA Astrophysics Data System (ADS)
Sarajlic, Edin; Yamahata, Christophe; Cordero, Mauricio; Fujita, Hiroyuki
2009-07-01
We present the design, microfabrication and characterization of an electrostatic 3-phase linear stepper micromotor constructed with vertical trench isolation technology. This suitable technology was used to create a monolithic stepper motor with high-aspect-ratio poles and an integrated 3-phase electrical network in the bulk of a standard single-crystal silicon wafer. The shuttle of the stepper motor is suspended by a flexure to avoid any mechanical contact during operation, enhancing the precision, repeatability and reliability of the stepping motion. The prototype is capable of a maximum travel of +/-26 µm (52 µm) at an actuation voltage of 30 V and a step size of 1.4 µm during a half-stepping sequence. This work was presented in part at the 19th MicroMechanics Europe Workshop (MME), 28-30 September 2008, Aachen, Germany.
NASA Technical Reports Server (NTRS)
Brumfield, M. L. (Compiler)
1984-01-01
A plan to develop a space technology experiments platform (STEP) was examined. NASA Langley Research Center held a STEP Experiment Requirements Workshop on June 29 and 30 and July 1, 1983, at which experiment proposers were invited to present more detailed information on their experiment concept and requirements. A feasibility and preliminary definition study was conducted and the preliminary definition of STEP capabilities and experiment concepts and expected requirements for support services are presented. The preliminary definition of STEP capabilities based on detailed review of potential experiment requirements is investigated. Topics discussed include: Shuttle on-orbit dynamics; effects of the space environment on damping materials; erectable beam experiment; technology for development of very large solar array deployers; thermal energy management process experiment; photovoltaic concentrater pointing dynamics and plasma interactions; vibration isolation technology; flight tests of a synthetic aperture radar antenna with use of STEP.
NASA Technical Reports Server (NTRS)
Jones, W. V. (Editor); Wefel, J. P. (Editor)
1985-01-01
The potential of the Space Station as a platform for cosmic-ray and high-energy gamma-ray astronomy is discussed in reviews, reports, and specific proposals. Topics examined include antiparticles and electrons, science facilities and new technology, high-energy nuclear interactions, nuclear composition and energy spectra, Space Shuttle experiments, Space Station facilities and detectors, high-energy gamma rays, and gamma-ray facilities and techniques. Consideration is given to universal-baryon-symmetry testing on the scale of galactic clusters, particle studies in a high-inclination orbit, balloon-borne emulsion-chamber results on ultrarelativistic nucleus-nucleus interactions, ionization states of low-energy cosmic rays, a large gamma-ray telescope for point-source studies above 1 GeV, and the possible existence of stable quark matter.
1990-09-01
array. LTHPER Length of the MPPERS array. LTHQPA Length of the QPA array. LTHXRT Length of the XROOT array. MAXACN Maximum number of aircraft that can...3 Time remaining until the ready-to-fly time at time of report Number of XROOT Array Entries (GENERATED) NROOT (MAXT) The total number of entries in...the XROOT array for each aircraft type. AIS Station Status NSTAT (NOSTAT, I, MAXB) I = 1 Total number of stations of each type on base = 2 Number in
NASA Technical Reports Server (NTRS)
Dowden, Donald J.; Bessette, Denis E.
1987-01-01
The AFTI F-16 Automated Maneuvering Attack System has undergone developmental and demonstration flight testing over a total of 347.3 flying hours in 237 sorties. The emphasis of this phase of the flight test program was on the development of automated guidance and control systems for air-to-air and air-to-ground weapons delivery, using a digital flight control system, dual avionics multiplex buses, an advanced FLIR sensor with laser ranger, integrated flight/fire-control software, advanced cockpit display and controls, and modified core Multinational Stage Improvement Program avionics.
1988-01-01
principle of introducing an international force, he had to discuss it with Maj. Gen. Tran Van Minh and Maj. Gen. Nguyen Van Thieu of the Armed Forces...from it within 2 days. Another attack in August on the camp at Duc Co was beaten back, largely by 280 tactical strike sorties. The final major enemy... Duc Co CORPS Nha Trang [3 CORPS Cam Ranh Bay Loc Ninh - 0 operation )’ Elp 4’Wng Vl pTo _fongN Ar0 ofPrloqe Cnfonat AttleMlbaroorroourdr ar Bate 138
The 25 kW power module evolution study. Part 1: Payload requirements and growth scenarios
NASA Technical Reports Server (NTRS)
1978-01-01
Payload power level requirements and their general impact on the baseline and growth versions of the 25 kW power module during the 1983 to 1990 period are discussed. Extended duration Orbiter sortie flight, supported by a power module, with increased payload power requirements per flight, and free-flyer payload missions are included. Other payload disciplines considered, but not emphasized for the 1983 to 1986 period include astrophysics/astronomy, earth observations, solar power satellite, and life sciences. Of these, only the solar power satellite is a prime driver for the power module.
Field Exploration Science for a Return to the Moon
NASA Astrophysics Data System (ADS)
Schmitt, H. H.; Helper, M. A.; Muehlbberger, W.; Snoke, A. W.
2006-12-01
Apollo field exploration science, and subsequent analysis, and interpretation of its findings and collected samples, underpin our current understanding of the origin and history of the Moon. That understanding, in turn, continues to provide new and important insights into the early histories of the Earth and other bodies in the solar system, particularly during the period that life formed and began to evolve on Earth and possibly on Mars. Those early explorations also have disclosed significant and potentially commercially viable lunar resources that might help satisfy future demand for both terrestrial energy alternatives and space consumables. Lunar sortie missions as part of the Vision for Space Exploration provide an opportunity to continue and expand the human geological, geochemical and geophysical exploration of the Moon. Specific objectives of future field exploration science include: (1) Testing of the consensus "giant impact" hypothesis for the origin of the Moon by further investigation of materials that may augment understanding of the chondritic geochemistry of the lower lunar mantle; (2) Testing of the consensus impact "cataclysm" hypothesis by obtaining absolute ages on large lunar basins of relative ages older than the 3.8-3.9 Ga mascon basins dated by Apollo 15 and 17; (3) Calibration of the end of large impacts in the inner solar system; (4) Global delineation of the internal structure of the Moon; (5) Global sampling and field investigations that extend the data necessary to remotely correlate major lunar geological and geochemical units; (6) Definition of the depositional history of polar volatiles - cometary, solar wind, or otherwise; (7) Determine the recoverable in situ concentrations and distribution of potential volatile resources; and (8) Acquisition of information and samples related to relatively less site-specific aspects of lunar geological processes. Planning for renewed field exploration of the Moon depends largely on the selection, training and use of sortie crews; the selection of landing sites; and the adopted operational approach to sortie extravehicular activity (EVA). The equipment necessary for successful exploration consists of that required for sampling, sample documentation, communications, mobility, and position knowledge. Other types of active geophysical. geochemical and petrographic equipment, if available, could clearly enhance the scientific and operational return of extended exploration over that possible during Apollo missions. Equipment to increase the efficiency of exploration should include the following, helmet-mounted, systems: (1) voice activated or automatic, electronic, stereo photo-documentation camera that is photometrically and geometrically fully calibrated; (2) automatic position and elevation determination system; and (3) laser-ranging device, aligned with the stereo camera axis. Heads-up displays and controls on the helmet, activated and selected by voice, should be available for control and use of this equipment.
+Gz Exposure and Spinal Injury-Induced Flight Duty Limitations.
Honkanen, Tuomas; Sovelius, Roope; Mäntysaari, Matti; Kyröläinen, Heikki; Avela, Janne; Leino, Tuomo K
2018-06-01
The present study aimed to find out if possible differences in early military flight career +Gz exposure level could predict permanent flight duty limitations (FDL) due to spinal disorders during a pilot's career. The study population consisted of 23 pilots flying with Gz limitation (max limitation ranging from +2 Gz to +5 Gz) due to spinal disorders and 50 experienced (+1000 flight hours) symptomless controls flying actively in operative missions in the Finnish Air Force. Data obtained for all subjects included the level of cumulative Gz exposure measured sortie by sortie with fatigue index (FI) recordings and flight hours during the first 5 yr of the pilot's career. The mean (± SD) accumulation of FI in the first 5 yr of flying high-performance aircraft was 8.0 ± 1.8 among the pilots in the FDL group and 7.7 ± 1.7 in the non-FDL group. There was no association between flight duty limitations and early career cumulative +Gz exposure level measured with FI or flight hours. According to the present findings, it seems that the amount of cumulative +Gz exposure during the first 5 yr of a military pilot's career is not an individual risk factor for spinal disorders leading to flight duty limitation. Future studies conducted with FI recordings should be addressed to reveal the relationship between the actual level of +Gz exposure and spinal disorders, with a longer follow-up period and larger sample sizes.Honkanen T, Sovelius R, Mäntysaari M, Kyröläinen H, Avela J, Leino TK. +Gz exposure and spinal injury-induced flight duty limitations. Aerosp Med Hum Perform. 2018; 89(6):552-556.
Effets non lineaires transversaux dans les guides d'ondes plans
NASA Astrophysics Data System (ADS)
Dumais, Patrick
Les effets non lineaires transversaux dus a l'effet Kerr optique non resonant sont etudies dans deux types de guides a geometrie plane. D'abord (au chapitre 2), l'emission de solitons spatiaux d'un guide de type canal est etudie historiquement, analytiquement et numeriquement dans le but d'en faire la conception et la fabrication, en AlGaAs, dans la region spectrale en deca de la moitie de la bande interdite de ce materiau, soit autour de 1,5 microns. Le composant, tel que concu, comporte une structure de multipuits quantiques. Le desordonnement local de cette structure permet une variation locale du coefficient Kerr dans le guide, ce qui mene a l'emission d'un soliton spatial au-dela d'une puissance optique de seuil. L'observation experimentale d'un changement en fonction de l'intensite du profil de champ a la sortie du guide realise est presentee. Deuxiemement (au chapitre 3) une technique de mesure du coefficient Kerr dans un guide plan est presentee. Cette technique consiste a mesurer le changement de transmission au travers d'un cache place a la sortie du guide en fonction de l'intensite crete a l'entree du guide plan. Une methode pour determiner les conditions optimales pour la sensibilite de la mesure est presentee, illustree de plusieurs exemples. Finalement, la realisation d'un oscillateur parametrique optique basee sur un cristal de niobate de lithium a domaines periodiquement inverses est presentee. La theorie des oscillateurs parametriques optiques est exposee avec une emphase sur la generation d'impulsions intenses a des longueurs d'onde autour de 1,5 microns a partir d'un laser Ti:saphir, dans le but d'obtenir une source pour faire les experiences sur l'emission solitonique.
Observing Solar Radio Bursts from the Lunar Surface
NASA Technical Reports Server (NTRS)
MacDowall, R. J.; Lazio, T. J.; Bale, S. D.; Burns, J.; Gopalswamy, N.; Jones, D. L.; Kaiser, M. L.; Kasper, J.; Weiler, K. W.
2010-01-01
Locating low frequency radio observatories on the lunar surface has a number of advantages. Here, we describe the Radio Observatory for Lunar Sortie Science (ROLSS), a concept for a low frequency, radio imaging interferometric array designed to study particle acceleration in the corona and inner heliosphere. ROLSS would be deployed during an early lunar sortie or by a robotic rover as part of an unmanned landing. The prime science mission is to image type II and type III solar radio bursts with the aim of determining the sites at and mechanisms by which the radiating particles are accelerated. Secondary science goals include constraining the density of the lunar ionosphere by searching for a low radio frequency cutoff of the solar radio emissions and constraining the low energy electron population in astrophysical sources. Furthermore, ROLSS serves a pathfinder function for larger lunar radio arrays. Key design requirements on ROLES include the operational frequency and angular resolution. The electron densities in the solar corona and inner heliosphere are such that the relevant emission occurs below 10 MHz, essentially unobservable from Earth's surface due to the terrestrial ionospheric cutoff. Resolving the potential sites of particle acceleration requires an instrument with an angular resolution of at least 2 deg, equivalent to a linear array size of approximately 500 meters. Operations would consist of data acquisition during the lunar day, with regular data downlinks. The major components of the ROLSS array are 3 antenna arms arranged in a Y shape, with a central electronics package (CEP). Each antenna arm is a linear strip of polyimide film (e.g., Kapton (TM)) on which 16 single polarization dipole antennas are located by depositing a conductor (e.g., silver). The arms also contain transmission lines for carrying the radio signals from the science antennas to the CEP.
Lithium Iron Phosphate Cell Performance Evaluations for Lunar Extravehicular Activities
NASA Technical Reports Server (NTRS)
Reid, Concha
2007-01-01
Lithium-ion battery cells are being evaluated for their ability to provide primary power and energy storage for NASA s future Exploration missions. These missions include the Orion Crew Exploration Vehicle, the Ares Crew Launch Vehicle Upper Stage, Extravehicular Activities (EVA, the advanced space suit), the Lunar Surface Ascent Module (LSAM), and the Lunar Precursor and Robotic Program (LPRP), among others. Each of these missions will have different battery requirements. Some missions may require high specific energy and high energy density, while others may require high specific power, wide operating temperature ranges, or a combination of several of these attributes. EVA is one type of mission that presents particular challenges for today s existing power sources. The Portable Life Support System (PLSS) for the advanced Lunar surface suit will be carried on an astronaut s back during eight hour long sorties, requiring a lightweight power source. Lunar sorties are also expected to occur during varying environmental conditions, requiring a power source that can operate over a wide range of temperatures. Concepts for Lunar EVAs include a primary power source for the PLSS that can recharge rapidly. A power source that can charge quickly could enable a lighter weight system that can be recharged while an astronaut is taking a short break. Preliminary results of Al23 Ml 26650 lithium iron phosphate cell performance evaluations for an advanced Lunar surface space suit application are discussed in this paper. These cells exhibit excellent recharge rate capability, however, their specific energy and energy density is lower than typical lithium-ion cell chemistries. The cells were evaluated for their ability to provide primary power in a lightweight battery system while operating at multiple temperatures.
NASA Technical Reports Server (NTRS)
Padgett, Mary L. (Editor)
1993-01-01
The present conference discusses such neural networks (NN) related topics as their current development status, NN architectures, NN learning rules, NN optimization methods, NN temporal models, NN control methods, NN pattern recognition systems and applications, biological and biomedical applications of NNs, VLSI design techniques for NNs, NN systems simulation, fuzzy logic, and genetic algorithms. Attention is given to missileborne integrated NNs, adaptive-mixture NNs, implementable learning rules, an NN simulator for travelling salesman problem solutions, similarity-based forecasting, NN control of hypersonic aircraft takeoff, NN control of the Space Shuttle Arm, an adaptive NN robot manipulator controller, a synthetic approach to digital filtering, NNs for speech analysis, adaptive spline networks, an anticipatory fuzzy logic controller, and encoding operations for fuzzy associative memories.
NASA Technical Reports Server (NTRS)
Alexander, W. M.; Tanner, William G.; Mcdonald, R. A.; Schaub, G. E.; Stephenson, Stepheni L.; Mcdonnell, J. A. M.; Maag, Carl R.
1994-01-01
The return of a pristine sample from a comet would lead to greater understanding of cometary structures, as well as offering insights into exobiology. The paper presented at the Discovery Program Workshop outlined a set of measurements for what was identified as a SOCCER-like interplanetary mission. Several experiments comprised the total instrumentation. This paper presents a summary of CCSR with an overview of three of the four major instruments. Details of the major dust dynamics experiment including trajectory are given in this paper. The instrument proposed here offers the opportunity for the return of cometary dust particles gathered in situ. The capture process has been employed aboard the space shuttle with successful results in returning samples to Earth for laboratory analysis. In addition, the sensors will measure the charge, mass, velocity, and size of cometary dust grains during the encounter. This data will help our understanding of dusty plasmas.
1990-09-01
by damage. SHPREP When not zero, all parts repaired at an operating base are shipped to the base that is selected with the SEND logic in the CONTRL ...nominal (at rest) skin temperature when each MOPP is worn, the pumping factor (y), the insulation factor (CLO), and the permeability factor (IM). The...temiperature is taken to be 35 0C, and 36"C for MOPP #5; the pumping factor (y) ranges from 0.200 to 0.270, the insulation factor (CLO) from 1.70 to
NASA Astrophysics Data System (ADS)
Lopez, L.; Gatti, A.; Maitre, A.; Treps, N.; Gigan, S.; Fabre, C.
2004-11-01
Nous nous intéressons au comportement spatial des fluctuations quantiques à la sortie d'un oscillateur paramétrique optique dégénéré en modes transverses, sous le seuil. En vue de futures expériences, nous étudions les effets de la diffraction dans le milieu paramétrique sur le bruit quantique spatial. Nous montrons que l'on voit apparaître une aire de cohérence de taille finie pour les effets quantiques transverses.
Structures spatiales localisées dans un oscillateur paramétrique optique (OPO)
NASA Astrophysics Data System (ADS)
Coulibaly, S.; Durniak, C.; Taki, M.
2004-11-01
La prise en compte du caractère non uniforme du pompage optique dans l'étude linéaire et faiblement non linéaire d'un OPO dégénéré (DOPO) a permis de mettre en évidence la discrétisation du seuil et l'existence de structures spatiales localisées de type Hermite-Gauss. L'évolution spatio-temporelle du signal en sortie est quant à elle gouvernée par l'équation de Ginzburg-Landau réelle dont les coefficients dépendent des variables d'espace.
1988-08-01
by crash- associated fires. I -2 An Epual Opportunity Agency b. all off-road tracks created by vehicles driven to the site to retrieve the wreakage...require responses: 1. The DEIS established that in 1977, 10,394 supersonic sorties capable of creating sonic booms were flown in the Sells Airspace, DEIS...report discuss the effect of a typical case of a F-16 aircraft flying at interme- diate power and z00 feet AGL creating a noise of 103dB. RDEI3 §4.3.2.1
NASA Technical Reports Server (NTRS)
1972-01-01
The selection and definition of candidate experiments and the associated experiment instrumentation requirements are described. Information is presented that addresses the following study objectives: (1) determine specific research and technology needs in the comm/nav field through a survey of the scientific/technical community; (2) develop manned low earth orbit space screening criteria and compile lists of potential candidate experiments; (3) in Blue Book format, define and describe selected candidate experiments in sufficient detail to develop laboratory configuration designs and layouts; and (4) develop experiment time phasing criteria and recommend a payload for sortie can/early laboratory missions.
The Lunar Mapping and Modeling Project
NASA Technical Reports Server (NTRS)
Noble, Sarah K.; French, R. A.; Nall, M. E.; Muery, K. G.
2009-01-01
The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses.
The Sortie-Generation Model System. Volume VI. Spares Subsystem,
1981-09-01
1020 F0rPT(I5,2’X,A18,F8.5,I4, F6 ..2,F9.5,I6,F12.2,T21,2F6.2) 3360 WRITE(2)NSNOUT (IOUjT), DEKWJT(IOUT), IQAOT(IOMJ), 3370 & FAPOUT(IOUJT),INITSOIJT(IOUT...tC IOOOCCCCCCO0COCCC rzOOOCzCCzzOc c 0MC =CCaCCr C C aCCa , 3. 3 3 L. U.3a33aL. 3 3i. .3 3 i. 3 3 . ~_K-17~t.. - 0 -0 g . .l C xCCr0 zJ1 wc ck aNC -C
Terrain Modelling for Immersive Visualization for the Mars Exploration Rovers
NASA Technical Reports Server (NTRS)
Wright, J.; Hartman, F.; Cooper, B.; Maxwell, S.; Yen, J.; Morrison, J.
2004-01-01
Immersive environments are being used to support mission operations at the Jet Propulsion Laboratory. This technology contributed to the Mars Pathfinder Mission in planning sorties for the Sojourner rover and is being used for the Mars Exploration Rover (MER) missions. The stereo imagery captured by the rovers is used to create 3D terrain models, which can be viewed from any angle, to provide a powerful and information rich immersive visualization experience. These technologies contributed heavily to both the mission success and the phenomenal level of public outreach achieved by Mars Pathfinder and MER. This paper will review the utilization of terrain modelling for immersive environments in support of MER.
Sortie Duration and Helicopter Component Failures (an Empirical Study).
1983-05-01
tD u* >0 I- . I : * >+0 .LJW ] 4 " * 0 0 0 (J * I L) C t > 0 .4-U. f> zJ, 1C I * >I >0 u~C. - - 0 0 0 .’ ZZ11- /- 0...o II -i I C! > 0 I go * - I 0 > 0 > > > 0 I 0 >go 7, I £0 - - f "- I10 SC) Z + > 0 * > I I > 0 >2 * >0 > - * +> (I) >O tD > O S> -0 + uic + >o - >1...8217,1 - C- o I * -CI II)- + o 1 10 -7 i C, C I ’ 1~ t JAJ I 10 I I: : IC , .. ,- .,. C.,, , , . : - ’ I,. . . . , - . . .... .1 .1 1 2it -C 4. )0 n 0
United States Air Force Statistical Digest, Fiscal Year 1968. Twenty Third Edition
1968-09-30
Tac1l1calMter - Total. f::Jiti. •• • • • •--;-:- • F-4Il •••• F-4.B•• F-l00fJ/F. F-IO$D/F. F- Uti • a:-W’aallteaopna1ssanae -1’otal • -40...Quarter Aircraft Quarter Hours On Hand uti 11- HOurs On Hand UU11- ANDS!RIIS, FlOlll1 During zaUon nown During zat10n ’. Quarter Rate Quarter Bate...8217MISSION :na.. DESIGN. AGE c . Uti - AVlm- ~ti-SERIES, ~ FLYING HOURS AGE FLYING HOURS WITHIN CoJllo. 11-. AIR- COJllo. 11-’ SortiesBASES u: bat za
Evaluation of Human and AutomationRobotics Integration Needs for Future Human Exploration Missions
NASA Technical Reports Server (NTRS)
Marquez, Jessica J.; Adelstein, Bernard D.; Ellis, Stephen; Chang, Mai Lee; Howard, Robert
2016-01-01
NASA employs Design Reference Missions (DRMs) to define potential architectures for future human exploration missions to deep space, the Moon, and Mars. While DRMs to these destinations share some components, each mission has different needs. This paper focuses on the human and automation/robotic integration needs for these future missions, evaluating them with respect to NASA research gaps in the area of space human factors engineering. The outcomes of our assessment is a human and automation/robotic (HAR) task list for each of the four DRMs that we reviewed (i.e., Deep Space Sortie, Lunar Visit/Habitation, Deep Space Habitation, and Planetary), a list of common critical HAR factors that drive HAR design.
Application of Interferometric Radars to Planetary Geologic Studies
NASA Technical Reports Server (NTRS)
Mouginis-Mark, P. J.; Rosen, P.; Freeman, A.
2005-01-01
Radar interferometry is rapidly becoming one of the major applications of radar systems in Earth orbit. So far the 2000 flight of the Shuttle Radar Topographic Mission (SRTM) is the only dedicated U.S. radar to be flown for the collection of interferometric data, but enough has been learned from this mission and from the use of foreign partner radars (ERS-1/2, Radarsat, ENIVISAT and JERS-1) for the potential planetary applications of this technique to be identified. A recent workshop was organized by the Jet Propulsion Laboratory and the Southern California Earthquake Center (SCEC), and was held at Oxnard, CA, from October 20th - 22nd, 2004. At this meeting, the major interest was in terrestrial radar systems, but approx. 20 or the approx. 250 attendees also discussed potential applications of interferometric radar for the terrestrial planets. The primary foci were for the detection of planetary water, the search for active tectonism and volcanism and the improved topographic mapping. This abstract provides a summary of these planetary discussions at the Oxnard meeting.
Lunar Outpost Life Support Trade Studies
NASA Technical Reports Server (NTRS)
Lange, Kevin E.; Anderson, Molly S.; Ewert, Michael K.; Barta, Daniel J.
2008-01-01
Engineering trade-off studies of life support system architecture and technology options were conducted for potential lunar surface mission scenarios within NASA's Constellation Program. The scenarios investigated are based largely on results of the NASA Lunar Architecture Team (LAT) Phase II study. In particular, the possibility of Hosted Sortie missions, the high cost of power during eclipse periods, and the potential to reduce life support consumables through scavenging, in-situ resources, and alternative EVA technologies were all examined. These trade studies were performed within the Systems Integration, Modeling and Analysis (SIMA) element of NASA's Exploration Life Support (ELS) technology development project. The tools and methodology used in the study are described briefly, followed by a discussion of mission scenarios, life support technology options and results presented in terms of equivalent system mass for various regenerative life support technologies and architectures. Three classes of repeated or extended lunar surface missions were investigated in this study along with several life support resource scenarios for each mission class. Individual mission durations of 14 days, 90 days and 180 days were considered with 10 missions assumed for each at a rate of 2 missions per year. The 14-day missions represent a class of Hosted Sortie missions where a pre-deployed and potentially mobile habitat provides life support for multiple crews at one or more locations. The 90-day and 180-day missions represent lunar outpost expeditions with a larger fixed habitat. The 180-day missions assume continuous human presence and must provide life support through eclipse periods of up to 122 hours while the 90-day missions are planned for best-case periods of nearly continuous sunlight. This paper investigates system optimization within the assumptions of each scenario and addresses how the scenario selected drives the life support system to different designs. Subsequently, these analysis results can be used to determine which technologies may be good choices throughout a broad range of architectures.
NASA Astrophysics Data System (ADS)
Farcy, R.; Damaschini, R.
1998-06-01
We describe a device currently under industrial development which will give to the blind a means of three-dimensional space perception. It consists of a 350 g hand-held triangulating laser telemeter including electronic parts and batteries, with auditory feedback either inside the apparatus or close to the ear. The microprocessor unit converts in real time the distance measured by the telemeter into a musical note. Scanning the space with an adequate movement of the hand produces musical lines corresponding to the profiles of the environment. We discuss the optical configuration of the system relative to our first year of clinical experimentation.
Air Force Integrated Readiness Measurement System (AFIRMS). Data Requirements Document.
1985-09-30
Task Type 3-47 3.2.7 Task Type 3-57 3.2.8 Aircraft 3-65 3.2.9 Airman 3-81 3.2.10 Unit’s Supply of Resource 3-97 3.2.11 Mission 3-129 3.2.12 Resource ... Supply at One Location 3-149 3.2.13 Resource Relationship Order 3-161 3.2.14 Sortie 3-167 3.2.15 Base 3-187 3.2.16 Order Identification 3-199 3.2.17...Unit’s Piece of Order 3-269 3.2.23 Role of Resource Type on Unit’s Piece’s Task Type 3-283 3.2.24 Unit’s Total Supply of Resource Type in a Given
Design and performance analysis of an aero-maneuvering orbital-transfer vehicle concept
NASA Technical Reports Server (NTRS)
Menees, G. P.
1985-01-01
Systems requirements for design-optimized, lateral-turn performance were determined for reusable, space-based applications and low-Earth orbits involving large multiple plane-inclination changes. The aerothermodynamic analysis is the most advanced available for rarefield-hypersonic flow over lifting surfaces at incidence. The effects of leading-edge bluntness, low-density viscous phenomena, and finite-rate flow-field chemistry and surface catalysis are accounted for. The predicted aerothermal heating characteristics are correlated with thermal-control and flight-performance capabilities. The mission payload capacity for delivery, retrieval, and combined operations was determined for round-trip sorties extending to polar orbits. Recommendations are given for future design refinements. The results help to identify technology issues required to develop prototype operational vehicles.
Engineering aspects of a thermal control subsystem for the 25 kW power module
NASA Technical Reports Server (NTRS)
Schroeder, P. E.
1979-01-01
The paper presents the key trade study results, analysis results, and the recommended thermal control approach for the 25 kW power module defined by NASA. Power conversion inefficiencies and component heat dissipation results in a minimum heat rejection requirement of 9 kW to maintain the power module equipment at desired temperature levels. Additionally, some cooling capacity should be provided for user payloads in the sortie and free-flying modes. The baseline thermal control subsystem includes a dual-loop-pumped Freon-21 coolant with the heat rejected from deployable existing orbiter radiators. Thermal analysis included an assessment of spacecraft orientations, radiator shapes and locations, and comparison of hybrid heat pipe and all liquid panels.
NASA Technical Reports Server (NTRS)
Paloski, William H.
2008-01-01
Balance control and locomotor patterns were altered in Apollo crewmembers on the lunar surface, owing, presumably, to a combination of sensory-motor adaptation during transit and lunar surface operations, decreased environmental affordances associated with the reduced gravity, and restricted joint mobility as well as altered center-of-gravity caused by the EVA pressure suits. Dr. Paloski will discuss these factors, as well as the potential human and mission impacts of falls and malcoordination during planned lunar sortie and outpost missions. Learning objectives: What are the potential impacts of postural instabilities on the lunar surface? CME question: What factors affect balance control and gait stability on the moon? Answer: Sensory-motor adaptation to the lunar environment, reduced mechanical and visual affordances, and altered biomechanics caused by the EVA suit.
Power system interface and umbilical system study
NASA Technical Reports Server (NTRS)
1980-01-01
System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.
NASA Technical Reports Server (NTRS)
Lewis, Robert
2013-01-01
This aerospace medicine clerkship project is under the direction of Dr. Sharmila Watkins and is in cooperation with Dr. Eric Kerstman and Dr. Ronak Shah. The questions of the research project are: 1. What are the main drivers of evacuation and loss of crew life (LOCL) on three Design Reference Missions (DRMs): Near Earth Asteroid (NEA), Lunar Sortie and Lunar Outpost using an inexhaustible International Space Station medical kit 2. What are the treatment designations for these driving medical conditions as listed in Expedition Medical Condition List (EMCL) 3. Do the drivers make sense in the context of the given Design Reference Mission (DRM) 4. Do any EMCL treatment designations need re-assessing.
2000 NASA Seal/Secondary Air System Workshop. Volume 1
NASA Technical Reports Server (NTRS)
Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)
2001-01-01
The 2000 NASA Seal/Secondary Air System Workshop covered four main areas: (1) overviews of NASA-sponsored Ultra-Efficient Engine Technology (UEET) and Access to Space Programs, with emphasis on program goals and seal needs; (2) review of turbine engine seal issues from the perspective of end users such as United Airlines; (3) reviews of sealing concepts, test results, experimental facilities, and numerical predictions; and (4) reviews of material development programs relevant to advanced seals development. The NASA UEET overview illustrates for the reader the importance of advanced technologies, including seals, in meeting future engine system efficiency and emission goals. GE, Pratt & Whitney, and Honeywell presented advanced seal development work being performed within their organizations. The NASA-funded GE/Stein Seal team has successfully demonstrated a large (3-ft. diam) aspirating seal that can withstand all anticipated pressures, speeds, and rotor runouts anticipated for a GE90 L.P. turbine balance piston location. GE/Stein Seal are fabricating a full-scale seal to be tested in a GE-90 ground test engine in early 2002. Pratt & Whitney and Stein Seal are investigating carbon seals to accommodate large radial movements anticipated in future geared-fan gearbox locations. Honeywell presented a finger seal design being considered for a high-temperature static combustor location incorporating ceramic finger elements. Successful demonstration of the braided carbon rope thermal barriers to extreme temperatures (5500 F) for short durations provide a new form of very high temperature thermal barrier for future Shuttle solid rocket motor nozzle joints. The X-37, X-38, and future highly reusable launch vehicles pose challenging control surface seal demands that require new seal concepts made from emerging high temperature ceramics and other materials.
NASA Technical Reports Server (NTRS)
Green, Robert O. (Editor)
1998-01-01
This publication contains the summaries for the Seventh JPL Airborne Earth Science Workshop, held in Pasadena, California, on January 12-16, 1998. The main workshop is divided into three smaller workshops, and each workshop has a volume as follows: (1) Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) Workshop; (2) Airborne Synthetic Aperture Radar (AIRSAR) Workshop; and (3) Thermal Infrared Multispectral Scanner (TIMS) Workshop. This Volume 1 publication contains 58 papers taken from the AVIRIS workshop.
Summaries of the 4th Annual JPL Airborne Geoscience Workshop. Volume 1: AVIRIS Workshop
NASA Technical Reports Server (NTRS)
Green, Robert O. (Editor)
1993-01-01
This publication contains the summaries for the Fourth Annual JPL Airborne Geoscience Workshop, held in Washington, D. C. October 25-29, 1993 The main workshop is divided into three smaller workshops as follows: The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, October 25-26 (the summaries for this workshop appear in this volume, Volume 1); The Thermal Infrared Multispectral Scanner (TMIS) workshop, on October 27 (the summaries for this workshop appear in Volume 2); and The Airborne Synthetic Aperture Radar (AIRSAR) workshop, October 28-29 (the summaries for this workshop appear in Volume 3).
Space Shuttle Projects Overview to Columbia Air Forces War College
NASA Technical Reports Server (NTRS)
Singer, Jody; McCool, Alex (Technical Monitor)
2000-01-01
This paper presents, in viewgraph form, a general overview of space shuttle projects. Some of the topics include: 1) Space Shuttle Projects; 2) Marshall Space Flight Center Space Shuttle Projects Office; 3) Space Shuttle Propulsion systems; 4) Space Shuttle Program Major Sites; 5) NASA Office of Space flight (OSF) Center Roles in Space Shuttle Program; 6) Space Shuttle Hardware Flow; and 7) Shuttle Flights To Date.
Summaries of the Third Annual JPL Airborne Geoscience Workshop. Volume 2: TIMS Workshop
NASA Technical Reports Server (NTRS)
Realmuto, Vincent J. (Editor)
1992-01-01
This publication contains the preliminary agenda and summaries for the Third Annual JPL Airborne Geoscience Workshop, held at the Jet Propulsion Laboratory, Pasadena, California, on 1-5 June 1992. This main workshop is divided into three smaller workshops as follows: (1) the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on June 1 and 2; the summaries for this workshop appear in Volume 1; (2) the Thermal Infrared Multispectral Scanner (TIMS) workshop, on June 3; the summaries for this workshop appear in Volume 2; and (3) the Airborne Synthetic Aperture Radar (AIRSAR) workshop, on June 4 and 5; the summaries for this workshop appear in Volume 3.
Summaries of the Third Annual JPL Airborne Geoscience Workshop. Volume 3: AIRSAR Workshop
NASA Technical Reports Server (NTRS)
Vanzyl, Jakob (Editor)
1992-01-01
This publication contains the preliminary agenda and summaries for the Third Annual JPL Airborne Geoscience Workshop, held at the Jet Propulsion Laboratory, Pasadena, California, on 1-5 June 1992. This main workshop is divided into three smaller workshops as follows: (1) the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on June 1 and 2; the summaries for this workshop appear in Volume 1; (2) the Thermal Infrared Multispectral Scanner (TIMS) workshop, on June 3; the summaries for this workshop appear in Volume 2; and (3) the Airborne Synthetic Aperture Radar (AIRSAR) workshop, on June 4 and 5; the summaries for this workshop appear in Volume 3.
Summaries of the Fifth Annual JPL Airborne Earth Science Workshop. Volume 3: AIRSAR Workshop
NASA Technical Reports Server (NTRS)
Vanzyl, Jakob (Editor)
1995-01-01
This publication is the third containing summaries for the Fifth Annual JPL Airborne Earth Science Workshop, held in Pasadena, California, on January 23-26, 1995. The main workshop is divided into three smaller workshops as follows: (1) The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on January 23-24. The summaries for this workshop appear in Volume 1; (2) The Airborne synthetic Aperture Radar (AIRSAR) workshop, on January 25-26. The summaries for this workshop appear in this volume; and (3) The Thermal Infrared Multispectral Scanner (TIMS) workshop, on January 26. The summaries for this workshop appear in Volume 2.
Summaries of the Fifth Annual JPL Airborne Earth Science Workshop. Volume 1: AVIRIS Workshop
NASA Technical Reports Server (NTRS)
Green, Robert O. (Editor)
1995-01-01
This publication is the first of three containing summaries for the Fifth Annual JPL Airborne Earth Science Workshop, held in Pasadena, California, on January 23-26, 1995. The main workshop is divided into three smaller workshops as follows: (1) The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on January 23-24. The summaries for this workshop appear in this volume; (2) The Airborne Synthetic Aperture Radar (AIRSAR) workshop, on January 25-26. The summaries for this workshop appear in Volume 3; and (3) The Thermal Infrared Multispectral Scanner (TIMS) workshop, on January 26. The summaries for this workshop appear in Volume 2.
Summaries of the 4th Annual JPL Airborne Geoscience Workshop. Volume 2: TIMS Workshop
NASA Technical Reports Server (NTRS)
Realmuto, Vincent J. (Editor)
1993-01-01
This is volume 2 of a three volume set of publications that contain the summaries for the Fourth Annual JPL Airborne Geoscience Workshop, held in Washington, D.C. on October 25-29, 1993. The main workshop is divided into three smaller workshops as follows: The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on October 25-26. The summaries for this workshop appear in Volume 1. The Thermal Infrared Multispectral Scanner (TIMS) workshop, on October 27. The summaries for this workshop appear in Volume 2. The Airborne Synthetic Aperture Radar (AIRSAR) workshop, on October 28-29. The summaries for this workshop appear in Volume 3.
Summaries of the Fifth Annual JPL Airborne Earth Science Workshop. Volume 2: TIMS Workshop
NASA Technical Reports Server (NTRS)
Realmuto, Vincent J. (Editor)
1995-01-01
This publication is the second volume of the summaries for the Fifth Annual JPL Airborne Earth Science Workshop, held in Pasadena, California, on January 23-26, 1995. The main workshop is divided into three smaller workshops as follows: (1) The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop on January 23-24. The summaries for this workshop appear in Volume 1; (2) The Airborne Synthetic Aperture Radar (AIRSAR) workshop on January 25-26. The summaries for this workshop appear in volume 3; and (3) The Thermal Infrared Multispectral Scanner (TIMS) workshop on January 26. The summaries for this workshop appear in this volume.
Workshops as a Research Methodology
ERIC Educational Resources Information Center
Ørngreen, Rikke; Levinsen, Karin
2017-01-01
This paper contributes to knowledge on workshops as a research methodology, and specifically on how such workshops pertain to e-learning. A literature review illustrated that workshops are discussed according to three different perspectives: workshops as a means, workshops as practice, and workshops as a research methodology. Focusing primarily on…
NASA Technical Reports Server (NTRS)
Kim, Yunjin (Editor)
1996-01-01
This publication contains the summaries for the Sixth Annual JPL Airborne Earth Science Workshop, held in Pasadena, California, on March 4-8, 1996. The main workshop is divided into two smaller workshops as follows: The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on March 4-6. The summaries for this workshop appear in Volume 1. The Airborne Synthetic Aperture Radar (AIRSAR) workshop, on March 6-8. The summaries for this workshop appear in Volume 2.
Summaries of the Sixth Annual JPL Airborne Earth Science Workshop. Volume 1; AVIRIS Workshop
NASA Technical Reports Server (NTRS)
Green, Robert O. (Editor)
1996-01-01
This publication contains the summaries for the Sixth Annual JPL Airborne Earth Science Workshop, held in Pasadena, California, on March 4-8, 1996. The main workshop is divided into two smaller workshops as follows: (1) The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on March 4-6. The summaries for this workshop appear in Volume 1; (2) The Airborne Synthetic Aperture Radar (AIRSAR) workshop, on March 6-8. The summaries for this workshop appear in Volume 2.
Energy and thermal regulation during bed rest and spaceflight
NASA Technical Reports Server (NTRS)
Greenleaf, John E.
1989-01-01
This paper presents data available from bed-rest and flight studies on the energy metabolism and thermoregulatory parameters and their changes during long-duration space missions which may influence requirements of astronauts for food and water. It is calculated, on the basis of 3100 kcal and 2.2 l water a day, with 1 h/day moderate exercise, that the requirements for a 2-yr flight would be 2,263,000 kcal and 1606 l water for each astronaut. One daily 5-h-long extravehicular sortie would require an additional 529,250 kcal and 1,095 l of water per year. Changes in the efficiency of work or metabolism would affect these nutritional requirements for long spaceflights. Factors that would increase food and water requirements are discussed.
ISS: A Science Classroom for America
NASA Astrophysics Data System (ADS)
McPherson, Alexander; Jenkins, Greg; Kenny, Nate
2002-01-01
Four years ago the scientific and engineering staff of our laboratory at the University of California Irvine initiated a student outreach program with the objective of teaching structural biology through involvement with scientific experiments on the International Space Station. That program is now active in 28 of the 50 United States, and has reached approximately 1100 middle and high school teachers, and 50,000 of their students. It will soon have a presence in every state through the support of NASA, The Space Grant Consortium, and a host of other private and public sector institutions. The program is based on a protein and virus crystallization experiment we are conducting at regular intervals of about 2-6 months on the International Space Station. The experiment utilizes a device called the Enhanced GN2 Dewar, and it has now been flown to Mir and the International Space Station more than ten times. The Enhanced GN2 Dewar is an extremely inexpensive, simple, high capacity system for the crystallization of macromolecules, including proteins, nucleic acids, and viruses, in a microgravity environment aboard the ISS (International Space Station). The samples, which are prepared by hand, are frozen by plunging them into liquid nitrogen and maintained in a common freezer until the time of mission launch. The Dewar keeps the samples frozen for periods up to twelve days, including that period during which they are placed on board the Space Shuttle, carried into space from Kennedy Space Center, and transferred to the ISS. We began the classroom experiments in November 1998 and the first workshop was given in January 1999. We have participated in four missions to the ISS. STS-106 on 9/8/2000, STS-98 on 2/7/2001, STS-104 on 7/12/2001, and STS-110 on 4/8/2002. To date we have conducted 28 teacher kit training workshops and 24-flight sample loading workshops. We have had 406 students and 266 teachers load actual flight samples. These participants selected through essay and project competitions were from AL, CA, GA, TN, FL, MI, TX, IN, IL, OH, and WV. We have had over 800 teachers from 35 different states participate in our kit training workshops. Our classroom experiment has been a huge success. Approximately 50,000 kids have done the classroom experiment with participants from AL, AZ, AR, CA, CO, GA, LA, FL, PA, MO, NM, MN, MS, TN, KY, NC, NY, NJ, OH, WV, PR,TX, WI, SC, MI, MA, IL, IN, VA, and MT. ISS will, therefore, serve, not only as a science laboratory for researchers, but as a science classroom for America.
The European Space Agency's FESTIP initiative
NASA Astrophysics Data System (ADS)
Burleson, Daphne
1998-01-01
In an effort to reduce the cost of access and open up new markets, the European Space Agency has begun a program called Future European Space Transportation Investigations Programme or FESTIP, in which reusable launcher concepts are being studied and developed. The ideal reusable launcher would be comparable to a normal aircraft in that it would be capable of taking off from many possible locations on Earth, enter the desired orbital plane, then accelerate to orbital velocity, release its payload, de-orbit, disperse its kinetic energy and land at the take-off base to be prepared for its next flight following a quick turnaround time. This ideal vehicle would be called the `single-stage-to-orbit reusable rocket launcher' or SSTO-RRL. All space launchers currently in use are staged to orbit and expendable, except the US Space Shuttle, and there is no SSTO-RRL in operation as yet. This paper will discuss the design options being studied by the European Space Agency (ESA) as well as their practical use in serving the space-launch market (FESTIP Workshop 1).
Summaries of the Sixth Annual JPL Airborne Earth Science Workshop. Volume 2; AIRSAR Workshop
NASA Technical Reports Server (NTRS)
Kim, Yun-Jin (Editor)
1996-01-01
The Sixth Annual JPL Airborne Earth Science Workshop, held in Pasadena, California, on March 4-8, 1996, was divided into two smaller workshops:(1) The Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, and The Airborne Synthetic Aperture Radar (AIRSAR) workshop. This current paper, Volume 2 of the Summaries of the Sixth Annual JPL Airborne Earth Science Workshop, presents the summaries for The Airborne Synthetic Aperture Radar (AIRSAR) workshop.
Space shuttle requirements/configuration evolution
NASA Technical Reports Server (NTRS)
Andrews, E. P.
1991-01-01
Space Shuttle chronology; Space Shuttle comparison; Cost comparison; Performance; Program ground rules; Sizing criteria; Crew/passenger provisions; Space Shuttle Main Engine (SSME) characteristics; Space Shuttle program milestones; and Space Shuttle requirements are outlined. This presentation is represented by viewgraphs.
Care of nestlings by wild female starlings exposed to an organophosphate pesticide
Grue, C.E.; Powell, G.V.N.; McChesney, M.J.
1982-01-01
(1) Our objective was to determine the effect of exposure to an organophosphate pesticide (OP), dicrotophos (3-hydroxy-N,N-dimethyl-cis-scrotonamide dimethyl phosphate), on care of nestlings by wild female starlings (Sturnus vulgaris)....(2) We selected twelve pairs of active nests based on synchrony in the reproductive cycle. When nestlings were 10 days old (day 10), adult males were captured and killed and brood size was adjusted to four. The frequency and temporal distribution of sorties made by each pair of females to feed their young were recorded for 2 h at 18.00 hours on day 11 and 06.00 hours on day 12. One female from each pair was given a single oral dose of dicrotophos (2.5 mg/kg of body weight) dissolved in corn oil; the second female received an equivalent exposure of pure corn oil. Birds were released and their nestlings weighed. Parental care was again monitored between 18.00 and 20.00 hours on day 12 and 06.00 and 08.00 hours on day 13. Females were then captured and they with their young were weighed and killed. Changes in parental care in OP-dosed and control females were compared using paired t-tests. ....(3) The OP-dosed females made significantly (P < 0.5) fewer sorties to feed their young and remained away from their boxes for longer periods of time than controls. Nestlings of OP-treated females lost significantly more weight (X = 9.3%) than nestlings of controls (X = 3.2%). Brain ChE activity in OP-treated females was inhibited an average of 50.7% compared with controls. Weight changes in OP-dosed (X = -8.9%) and control females (X = -8.3%) were similar.....(4) Results indicate that parental care may be significantly reduced in songbirds receiving severe but sublethal exposure to organophosphate pesticides. The potential for a reduction or modification in parental care to alter reproductive success in passerines is discussed..... (5) Techniques utilized, or modifications thereof, may be useful in collecting the additional data needed to adequately assess the impact of OPs on songbird reproduction.
Real-time planning/replanning of ongoing operations in a crisis situation
NASA Astrophysics Data System (ADS)
Griffith, David A.; Smith, Gregory M.
1997-02-01
The ability to examine the planned position and movement of police vehicles, personnel, weapons, and status of police assets is an implied requirement in the conduct of police activities. Displays showing the time police vehicles leave on assignment, stops along their route, time of return to station, quantity of vehicles, types of weapons, radio frequencies, and other pertinent information could help in crisis situations. It would be especially helpful if it were easily accessible and simple to understand. Rome Laboratory developed a system for monitoring interrelated planned events and for changing these events to correct for deviations in the plan. The system is called force level execution (FLEX), and it displays information on timing charts, tables, and a geographic map background. The FLEX graphics enhance the military commander's ability to grasp the tactical situation which typically includes 2000 to 3000 air sorties per day. A sortie is a single flight of a single aircraft. Because the 'fog of war' causes unexpected events, status reports are needed, replanning options are generated, and new plans are issued to correct for these unexpected events. The authors believe there are law enforcement and other crisis situations that are analogous to some military scenarios. These may include state police operating over large geographical areas, coordination with county police operating over somewhat smaller areas, coordination with the county sheriff's office and city police, not only for criminal apprehension, but for disaster relief. Other participants in a crisis situation may include fire departments, ambulances, emergency medical vehicles, hospitals, rescue operations, etc. The position of police vehicles, foot patrolman, helicopters and emergency vehicles can all be superimposed upon a map background, with appropriate cultural features such as roads, rivers, bridges, state and country boundaries, etc. When police vehicles incorporate the global positioning system (GPS), an automated status display could potentially show the exact locations of these vehicles in real time. This paper shows how the Air Force is using this technology and how, in the author's opinion, FLEX might be adapted to law enforcement and disaster relief situations.
Tripp, L D; Chelette, T; Savul, S; Widman, R A
1998-09-01
One of the key factors in maintaining optimal cognitive performance in the high-G environment is the adequate delivery of oxygen to the cerebral tissue. As eye-level blood pressure is compromised at 22 mmHg x G(-1), perfusion to the peripheral cerebral tissues (cerebral cortex) may not be adequate to support the mental demands of flight. This study measured the effect of closed-loop flight simulations (3 min) on cerebral oxygen saturation changes (rSO2), arterial oxygen saturation (SAO2), and heart rate (HR), in both rested (8 h of rest) and sleepless (24 h without sleep) conditions. Subjects (16; 8 males and 8 females) were subjected to G-exposures via closed-loop flight simulations in a series of four 3-min sorties flown by subjects on the Dynamic Environment Simulator (centrifuge) in either a rested or a sleepless state. Prior to the centrifuge flight, subjects were instrumented with sensors for measurement of arterial oxygen saturation (SAO2) and regional cerebral tissue oxygenation (rSO2). Subjects wore the standard flight suit, boots, CSU-13B/P anti-G suit, and the COMBAT EDGE positive-pressure breathing for G-protection system. Significant changes in cerebral and arterial oxygen saturation were observed within groups when comparing pretest baselines and minimum values during the test and pre- and post-G rSO2, SAO2, and HR in both the rested and sleepless state, (p # 0.01), respectively, for each group. Comparisons between groups showed women to have significantly smaller regional cerebral cortex oxygen decreases than men (p # 0.01). No significant changes in SAO2, however, were observed between groups. Both men and women showed a slow recovery of rSO2 values to the prebaseline levels. Sleeplessness had no effect on the rSO2, SAO2, and HR compared with the rested condition. During acceleration, regional cerebral tissue oxygen decreased 13% in men compared with 9% in women. The recovery of cerebral tissue oxygen levels to prebaseline values was retarded somewhat when compared with the recovery response of arterial oxygen saturation.
NASA Technical Reports Server (NTRS)
Fragola, Joseph R.; Maggio, Gaspare; Frank, Michael V.; Gerez, Luis; Mcfadden, Richard H.; Collins, Erin P.; Ballesio, Jorge; Appignani, Peter L.; Karns, James J.
1995-01-01
Volume 5 is Appendix C, Auxiliary Shuttle Risk Analyses, and contains the following reports: Probabilistic Risk Assessment of Space Shuttle Phase 1 - Space Shuttle Catastrophic Failure Frequency Final Report; Risk Analysis Applied to the Space Shuttle Main Engine - Demonstration Project for the Main Combustion Chamber Risk Assessment; An Investigation of the Risk Implications of Space Shuttle Solid Rocket Booster Chamber Pressure Excursions; Safety of the Thermal Protection System of the Space Shuttle Orbiter - Quantitative Analysis and Organizational Factors; Space Shuttle Main Propulsion Pressurization System Probabilistic Risk Assessment, Final Report; and Space Shuttle Probabilistic Risk Assessment Proof-of-Concept Study - Auxiliary Power Unit and Hydraulic Power Unit Analysis Report.
Main propulsion system test requirements for the two-engine Shuttle-C
NASA Technical Reports Server (NTRS)
Lynn, E. E.; Platt, G. K.
1989-01-01
The Shuttle-C is an unmanned cargo carrying derivative of the space shuttle with optional two or three space shuttle main engines (SSME's), whereas the shuttle has three SSME's. Design and operational differences between the Shuttle-C and shuttle were assessed to determine requirements for additional main propulsion system (MPS) verification testing. Also, reviews were made of the shuttle main propulsion test program objectives and test results and shuttle flight experience. It was concluded that, if significant MPS modifications are not made beyond those currently planned, then main propulsion system verification can be concluded with an on-pad flight readiness firing.
Systems Engineering Workshops | Wind | NREL
Workshops Systems Engineering Workshops The Wind Energy Systems Engineering Workshop is a biennial topics relevant to systems engineering and the wind industry. The presentations and agendas are available for all of the Systems Engineering Workshops: The 1st NREL Wind Energy Systems Engineering Workshop
PV Reliability Workshop | Photovoltaic Research | NREL
Laboratory. NREL hosts an annual Photovoltaic Reliability Workshop (PVRW) so that solar technology experts Photovoltaic Reliability Workshop (PVRW) will be held Tuesday, February 27, to Thursday, March 1, at the workshop. 2017 Workshop The 2017 Photovoltaic Reliability Workshop (PVRW) was Tuesday, February 28, to
Summaries of the Third Annual JPL Airborne Geoscience Workshop. Volume 1: AVIRIS Workshop
NASA Technical Reports Server (NTRS)
Green, Robert O. (Editor)
1992-01-01
This publication contains the preliminary agenda and summaries for the Third Annual JPL Airborne Geoscience Workshop, held at the Jet Propulsion Laboratory, Pasadena, California, on 1-5 June 1992. This main workshop is divided into three smaller workshops as follows: (1) the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS) workshop, on June 1 and 2; (2) the Thermal Infrared Multispectral Scanner (TIMS) workshop, on June 3; and (3) the Airborne Synthetic Aperture Radar (AIRSAR) workshop, on June 4 and 5. The summaries are contained in Volumes 1, 2, and 3, respectively.
Summaries of the 4th Annual JPL Airborne Geoscience Workshop. Volume 3: AIRSAR Workshop
NASA Technical Reports Server (NTRS)
Vanzyl, Jakob (Editor)
1993-01-01
This publication contains the summaries for the Fourth Annual JPL Airborne Geoscience Workshop, held in Washington, D.C. on October 25-29, 1993. The main workshop is divided into three smaller workshops as follows: The Airborne Visible/Infrared Spectrometer (AVIRIS) workshop, on October 25-26, whose summaries appear in Volume 1; The Thermal Infrared Multispectral Scanner (TIMS) workshop, on October 27, whose summaries appear in Volume 2; and The Airborne Synthetic Aperture Radar (AIRSAR) workshop, on October 28-29, whose summaries appear in this volume, Volume 3.
Loads and low frequency dynamics data base: Version 1.1 November 8, 1985. [Space Shuttles
NASA Technical Reports Server (NTRS)
Garba, J. A. (Editor)
1985-01-01
Structural design data for the Shuttle are presented in the form of a data base. The data can be used by designers of Shuttle experiments to assure compliance with Shuttle safety and structural verification requirements. A glossary of Shuttle design terminology is given, and the principal safety requirements of Shuttle are summarized. The Shuttle design data are given in the form of load factors.
Shuttle/GPSPAC experimentation study
NASA Technical Reports Server (NTRS)
Moses, J.; Flack, J. F.
1977-01-01
The utilization is discussed of the GPSPAC, which is presently being developed to be used on the low altitude host vehicle (LAHV), for possible use in the shuttle avionics system to evaluate shuttle/GPS navigation performance. Analysis and tradeoffs of the shuttle/GPS link, shuttle signal interface requirements, oscillator tradeoffs and GPSPAC mechanical modifications for shuttle are included. Only the on-orbit utilization of GPSPAC for the shuttle is discussed. Other phases are briefly touched upon. Recommendations are provided for using the present GPSPAC and the changes required to perform shuttle on-orbit navigation.
Creating Fantastic PI Workshops
DOE Office of Scientific and Technical Information (OSTI.GOV)
Biedermann, Laura B.; Clark, Blythe G.; Colbert, Rachel S.
The goal of this SAND report is to provide guidance for other groups hosting workshops and peerto-peer learning events at Sandia. Thus this SAND report provides detail about our team structure, how we brainstormed workshop topics and developed the workshop structure. A Workshop “Nuts and Bolts” section provides our timeline and check-list for workshop activities. The survey section provides examples of the questions we asked and how we adapted the workshop in response to the feedback.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-21
... series of public workshops entitled ``Designing for Impact: Workshop on Building the National Network for...-president-manufacturing-and-economy . The Designing for Impact workshop series is organized by the federal...: ``Designing for Impact III: Workshop on Building the National Network for Manufacturing Innovation'' AGENCY...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-30
...).'' This workshop series provides a forum for the AMNPO to present the proposed design of the National...: Blueprint for Action: Workshop on the Design of the National Network for Manufacturing Innovation (NNMI... Standards and Technology (NIST), announces the first workshop in a new series of public workshops entitled...
Connecting with the Arts: A Workshop for Middle Grades Teachers
ERIC Educational Resources Information Center
Annenberg Media, 2005
2005-01-01
"Connecting with the Arts: A Workshop for Middle Grades Teachers" is a video workshop for middle school teachers of the arts and other subjects. The workshop includes eight hour-long video programs and a companion workshop guide and Web site. The workshop shows middle school teachers why and how to integrate the arts (dance, music, theatre, and…
Mission and space vehicle sizing data for a chemical propulsion/aerobraking option
NASA Technical Reports Server (NTRS)
Butler, John; Brothers, Bobby
1986-01-01
Sizing data is presented for various combinations of Mars missions and chemical-propulsion/aerobraking vehicles. Data is compared for vehicles utilizing opposition (2-year mission) and conjunction (3-year mission) trajectories for 1999 and 2001 opportunities, for various sizes of vehicles. Payload capabilities for manned and unmanned missions vehicles and for propulsive-braking and aerobraking cases are shown. The effect of scaling up a reference vehicle is compared to the case of utilizing two identical vehicles, for growth in payload capability. The rate of cumulative build up of weight on the surface of Mars is examined for various mission/vehicle combinations, and is compared to the landed-weight requirements for sortie missions, moving-base missions, and fixed-base missions. Also, the required buildup of weight in low Earth orbit (LEO) for various mission/vehicle combinations is presented and discussed.
NASA Technical Reports Server (NTRS)
1979-01-01
An array deployment assembly, power regulation and control assembly, the necessary interface, and display and control equipment comprise the power extension package (PEP) which is designed to provide increased power and duration, as well as reduce fuel cell cryogen consumption during Spacelab missions. Compatible with all currently defined missions and payloads, PEP imposes minimal weight and volume penalties on sortie missions, and can be installed and removed as needed at the launch site within the normal Orbiter turnaround cycle. The technology on which it is based consists of a modified solar electric propulsion array, standard design regulator and control equipment, and a minimally modified Orbiter design. The requirements from which PEP was derived, and the system and its performance capabilities are described. Features of the recommended project are presented.
NASA Technical Reports Server (NTRS)
Smith, Kelly M.
2016-01-01
NASA is scheduled to launch the Orion spacecraft atop the Space Launch System on Exploration Mission 1 in late 2018. When Orion returns from its lunar sortie, it will encounter Earth's atmosphere with speeds in excess of 11 kilometers per second, and Orion will attempt its first precision-guided skip entry. A suite of flight software algorithms collectively called the Entry Monitor has been developed in order to enhance crew situational awareness and enable high levels of onboard autonomy. The Entry Monitor determines the vehicle capability footprint in real-time, provides manual piloting cues, evaluates landing target feasibility, predicts the ballistic instantaneous impact point, and provides intelligent recommendations for alternative landing sites if the primary landing site is not achievable. The primary engineering challenges of the Entry Monitor is in the algorithmic implementation in making a highly reliable, efficient set of algorithms suitable for onboard applications.
Paleohydrology Workshops for Water Resource Managers Using an Iterative Evaluation Process
NASA Astrophysics Data System (ADS)
Woodhouse, C.; Lukas, J.
2008-12-01
Workshops can be an effective avenue for the exchange of information and ideas between scientists and decision-makers. The interactive aspects of workshops promote more active participation and interactions between the two groups. In 2006, at the suggestion of water resource managers, we began presenting a series of small workshops (10-25 participants) on the use and application of tree-ring data in water resource management. The one-day workshops cover the basic science behind tree-ring reconstructions of hydrology, resources available, and applications of the data to resource management, with presentations by both tree-ring scientists and water resource professionals. They also include plenty of time for informal discussion. We have now held ten workshops across the western U.S., and several more are planned. We use pre-workshop surveys to tailor the workshop to the needs of the participants, and we assess the workshop's effectiveness through participant evaluations completed at the end of the workshop. We also receive post-workshop feedback in the form of follow-up emails or via word of mouth. This iterative process of evaluation, with each workshop, has enabled us to fine-tune the format and content of the workshops and respond to additional needs such as data, web resources, online tools for using paleodata, as well as follow-up workshops. This approach has resulted in an improvement in the credibility, acceptance, and use of tree-ring data in water resource applications, as evidenced by an independent survey of workshop participants. Although the focus of these workshops has been on paleohydrologic data, this approach would be applicable to other climate-stakeholder issues as well.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moy, Derek; Manivannan, A.; Narayanan, S. R.
2014-11-04
The shuttling of polysulfide ions between the electrodes in a lithium-sulfur battery is a major technical issue limiting the self-discharge and cycle life of this high-energy rechargeable battery. Although there have been attempts to suppress the shuttling process, there has not been a direct measurement of the rate of shuttling. We report here a simple and direct measurement of the rate of the shuttling (that we term “shuttle current”), applicable to the study of any type of lithium-sulfur cell. We demonstrate the effectiveness of this measurement technique using cells with and without lithium nitrate (a widely-used shuttle suppressor additive). Wemore » present a phenomenological analysis of the shuttling process and simulate the shuttle currents as a function of the state-of-charge of a cell. We also demonstrate how the rate of decay of the shuttle current can be used to predict the capacity fade in a lithium-sulfur cell due to the shuttle process. As a result, we expect that this new ability to directly measure shuttle currents will provide greater insight into the performance differences observed with various additives and electrode modifications that are aimed at suppressing the rate of shuttling of polysulfide ions and increasing the cycle life of lithium-sulfur cells.« less
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, United Space Alliance (USA) Director of Orbiter Operations Patty Stratton, and NASA Space Shuttle Program Manager William Parsons view the underside of Shuttle Discovery in Orbiter Processing Facility Bay 3. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Environmental protection requirements for scout/shuttle auxiliary stages
NASA Technical Reports Server (NTRS)
Qualls, G. L.; Kress, S. S.; Storey, W. W.; Ransdell, P. N.
1980-01-01
The requirements for enabling the Scout upper stages to endure the expected temperature, mechanical shock, acoustical and mechanical vibration environments during a specified shuttle mission were determined. The study consisted of: determining a shuttle mission trajectory for a 545 kilogram (1200 pound) Scout payload; compilation of shuttle environmental conditions; determining of Scout upper stages environments in shuttle missions; compilation of Scout upper stages environmental qualification criteria and comparison to shuttle mission expected environments; and recommendations for enabling Scout upper stages to endure the exptected shuttle mission environments.
ERIC Educational Resources Information Center
Employment and Training Administration (DOL), Washington, DC.
Presented is the statistical appendix to the Department of Labor's survey of sheltered workshop programs for handicapped persons. Included are 198 tables on such aspects as regional distribution of sheltered workshops and clients, client capacity of workshops, clients not accepted for workshop services, capital investment in plant and equipment,…
Earth Observatory Satellite system definition study. Report 6: Space shuttle interfaces/utilization
NASA Technical Reports Server (NTRS)
1974-01-01
An analysis was conducted to determine the compatibility of the Earth Observatory Satellite (EOS) with the space shuttle. The mechanical interfaces and provisions required for a launch or retrieval of the EOS by the space shuttle are summarized. The space shuttle flight support equipment required for the operation is defined. Diagrams of the space shuttle in various configurations are provised to show the mission capability with the EOS. The subjects considered are as follows: (1) structural and mechanical interfaces, (2) spacecraft retention and deployment, (3) spacecraft retrieval, (4) electrical interfaces, (5) payload shuttle operations, (6) shuttle mode cost analysis, (7) shuttle orbit trades, and (8) safety considerations.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, United Space Alliance (USA) Deputy Space Shuttle Program Manager of Operations Loren Shriver, USA Associate Program Manager of Ground Operations Andy Allen, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and USA Vice President and Space Shuttle Program Manager Howard DeCastro examine a tile used in the Shuttle's Thermal Protection System (TPS) in KSC's TPS Facility. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
75 FR 28051 - Public Workshop: Pieces of Privacy
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... DEPARTMENT OF HOMELAND SECURITY Office of the Secretary Public Workshop: Pieces of Privacy AGENCY: Privacy Office, DHS. ACTION: Notice announcing public workshop. SUMMARY: The Department of Homeland Security Privacy Office will host a public workshop, ``Pieces of Privacy.'' DATES: The workshop will be...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-15
... Atlantic stock of black sea bass and golden tilefish will consist of a series of three workshops: A Data Workshop, an Assessment Workshop, and a Review Workshop. The Review Workshop date, time, and location will...
Advanced technology and the Space Shuttle /10th Von Karman Lecture/.
NASA Technical Reports Server (NTRS)
Love, E. S.
1973-01-01
Selected topics in technology advancement related to the space shuttle are examined. Contributions from long-range research prior to the advent of the 'shuttle-focused technology program' of the past 3 years are considered together with highlights from the latter. Attention is confined to three of the shuttle's seven principal technology areas: aerothermodynamics/configurations, dynamics/aeroelasticity, and structures/materials. Some observations are presented on the shuttle's origin, the need to sustain advanced research, and future systems that could emerge from a combination of shuttle and non-shuttle technology advancements.
NASA Contingency Shuttle Crew Support (CSCS) Medical Operations
NASA Technical Reports Server (NTRS)
Adams, Adrien
2010-01-01
The genesis of the space shuttle began in the 1930's when Eugene Sanger came up with the idea of a recyclable rocket plane that could carry a crew of people. The very first Shuttle to enter space was the Shuttle "Columbia" which launched on April 12 of 1981. Not only was "Columbia" the first Shuttle to be launched, but was also the first to utilize solid fuel rockets for U.S. manned flight. The primary objectives given to "Columbia" were to check out the overall Shuttle system, accomplish a safe ascent into orbit, and to return back to earth for a safe landing. Subsequent to its first flight Columbia flew 27 more missions but on February 1st, 2003 after a highly successful 16 day mission, the Columbia, STS-107 mission, ended in tragedy. With all Shuttle flight successes come failures such as the fatal in-flight accident of STS 107. As a result of the STS 107 accident, and other close-calls, the NASA Space Shuttle Program developed contingency procedures for a rescue mission by another Shuttle if an on-orbit repair was not possible. A rescue mission would be considered for a situation where a Shuttle and the crew were not in immediate danger, but, was unable to return to Earth or land safely. For Shuttle missions to the International Space Station (ISS), plans were developed so the Shuttle crew would remain on board ISS for an extended period of time until rescued by a "rescue" Shuttle. The damaged Shuttle would subsequently be de-orbited unmanned. During the period when the ISS Crew and Shuttle crew are on board simultaneously multiple issues would need to be worked including, but not limited to: crew diet, exercise, psychological support, workload, and ground contingency support
Building Strong Geoscience Departments Through the Visiting Workshop Program
NASA Astrophysics Data System (ADS)
Ormand, C. J.; Manduca, C. A.; Macdonald, H.; Bralower, T. J.; Clemens-Knott, D.; Doser, D. I.; Feiss, P. G.; Rhodes, D. D.; Richardson, R. M.; Savina, M. E.
2011-12-01
The Building Strong Geoscience Departments project focuses on helping geoscience departments adapt and prosper in a changing and challenging environment. From 2005-2009, the project offered workshop programs on topics such as student recruitment, program assessment, preparing students for the workforce, and strengthening geoscience programs. Participants shared their departments' challenges and successes. Building on best practices and most promising strategies from these workshops and on workshop leaders' experiences, from 2009-2011 the project ran a visiting workshop program, bringing workshops to 18 individual departments. Two major strengths of the visiting workshop format are that it engages the entire department in the program, fostering a sense of shared ownership and vision, and that it focuses on each department's unique situation. Departments applied to have a visiting workshop, and the process was highly competitive. Selected departments chose from a list of topics developed through the prior workshops: curriculum and program design, program elements beyond the curriculum, recruiting students, preparing students for the workforce, and program assessment. Two of our workshop leaders worked with each department to customize and deliver the 1-2 day programs on campus. Each workshop incorporated exercises to facilitate active departmental discussions, presentations incorporating concrete examples drawn from the leaders' experience and from the collective experiences of the geoscience community, and action planning to scaffold implementation. All workshops also incorporated information on building departmental consensus and assessing departmental efforts. The Building Strong Geoscience Departments website complements the workshops with extensive examples from the geoscience community. Of the 201 participants in the visiting workshop program, 140 completed an end of workshop evaluation survey with an overall satisfaction rating of 8.8 out of a possible 10 points. Workshops resulted in changes in faculty attitudes and planned changes in programming. Participants wrote that they felt a greater ownership of their curricula and had a deeper understanding of the importance of general education offerings; they recognized a need for improvement; and they recognized a need to communicate the value of the geosciences to their institutions. Planned programmatic changes focused on curriculum revision, program assessment, student recruitment, and interactions with the institutional administration and the public. Leaders noted that the most effective workshops were those where the faculty cancelled all other activities for the duration of the workshop to focus on workshop goals.
77 FR 12313 - Food Labeling Workshop; Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-29
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0001] Food Labeling Workshop; Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION: Notice of public workshop. The Food and Drug Administration (FDA), Office of Regulatory Affairs (ORA), Dallas...
75 FR 29775 - Food Labeling Workshop; Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-27
... DEPARTMENT OF HEALTH AND HUMAN SERVICES [Docket No. FDA-2010-N-0001] Food and Drug Administration Food Labeling Workshop; Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION: Notice of public workshop. SUMMARY: The Food and Drug Administration (FDA), Office of Regulatory Affairs, Southwest...
75 FR 74736 - Food Labeling Workshop; Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-N-0001] Food Labeling Workshop; Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION: Notice of public workshop. SUMMARY: The Food and Drug Administration (FDA), Office of Regulatory Affairs, Southwest...
41 CFR 60-741.47 - Sheltered workshops.
Code of Federal Regulations, 2014 CFR
2014-07-01
... sheltered workshops may be included within an affirmative action program if the sheltered workshop trains... 41 Public Contracts and Property Management 1 2014-07-01 2014-07-01 false Sheltered workshops. 60... REGARDING INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.47 Sheltered workshops...
NASA Technical Reports Server (NTRS)
Dreschel, Thomas W.
1996-01-01
The National Aeronautics and Space Administration holds summer teacher workshops to motivate teachers to use space science in their lessons. In evaluating these workshops, the areas of interest were participant beliefs about science and science teaching and concerns about educational change and innovation. The teachers attending workshops in 1995, past participants, teachers that received materials but had not attended a workshop, and science researchers were surveyed using the Beliefs about Science and Science Education Survey and/or the Stages of Concern Questionnaire. Comparisons were made by workshop length, time since workshop, and highest grade taught. Reductions in concerns were most evident in the four week workshop. Changes in beliefs were also observed relative to teaching approach and ability. Differences in beliefs were observed between teachers and science researchers. Differences were also observed relative to time since attendance and by grade level taught. It is recommended that the workshops be at least four weeks in length and in length and target specific grade levels, that refresher workshops be offered.
Toward a history of the space shuttle. An annotated bibliography
NASA Technical Reports Server (NTRS)
Launius, Roger D. (Compiler); Gillette, Aaron K. (Compiler)
1992-01-01
This selective, annotated bibliography discusses those works judged to be most essential for researchers writing scholarly studies on the Space Shuttle's history. A thematic arrangement of material concerning the Space Shuttle will hopefully bring clarity and simplicity to such a complex subject. Subjects include the precursors of the Space Shuttle, its design and development, testing and evaluation, and operations. Other topics revolve around the Challenger accident and its aftermath, promotion of the Space Shuttle, science on the Space Shuttle, commercial uses, the Space Shuttle's military implications, its astronaut crew, the Space Shuttle and international relations, the management of the Space Shuttle Program, and juvenile literature. Along with a summary of the contents of each item, judgments have been made on the quality, originality, or importance of some of these publications. An index concludes this work.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- NASA and United Space Alliance (USA) Space Shuttle program managers attend a briefing, part of activities during a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC. Starting third from left are NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, USA Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Space Shuttle Program Manager William Parsons, and USA Associate Program Manager of Ground Operations Andy Allen.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik, and a USA technician examine cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) technicians demonstrate the construction of a thermal blanket used in the Shuttle's thermal protection system for USA Vice President and Space Shuttle Program Manager Howard DeCastro (second from left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician discusses aspects of Shuttle processing performed in the Solid Rocket Booster (SRB) Assembly and Refurbishment Facility (ARF) with USA Vice President and Space Shuttle Program Manager Howard DeCastro and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility Bay 1, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) and United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (right) are briefed by a USA technician (center) on Shuttle processing in the payload bay of orbiter Atlantis. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (third from left) watch as a USA technician (right) creates a tile for use in the Shuttle's Thermal Protection System (TPS). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
NASA Astrophysics Data System (ADS)
Fox, L. K.; Guertin, L. A.
2013-12-01
The Geosciences Division of the Council of Undergraduate Research (GeoCUR, http://curgeoscience.wordpress.com/) has a long history of supporting faculty who engage in undergraduate research. The division has held faculty development workshops at national meetings of the GSA and AGU for over 15 years. These workshops serve faculty at all career stages and cover multiple aspects of the enterprise of engaging students in undergraduate research. Topics covered include: getting a job (particularly at a primarily undergraduate institution), incorporating research into classes, mentoring independent research projects and identifying sources of internal and external funding. Originally, these workshops were funded through CUR and registration income. When the administrative costs to run the workshops increased, we successfully sought funding from the NSF Course, Curriculum, and Laboratory Improvement (CCLI) program. This CCLI Type 1 special project allowed the expansion of the GSA workshops from half-day to full-day and the offering of workshops to other venues, including the annual meeting of the Association of American Geographers and sectional GSA meetings. The workshops are organized and led by GeoCUR councilors, some of whom attended workshops as graduate students or new faculty. Current and past Geoscience program officers in the NSF Division of Undergraduate Education (DUE) have presented on NSF funding opportunities. Based on participant surveys, the content of the workshops has evolved over time. Workshop content is also tailored to the particular audience; for example, AGU workshops enroll more graduate students and post-docs and thus the focus is on the job ';search' and getting started in undergraduate research. To date, this CCLI Type 1 project has supported 15 workshops and a variety of print and digital resources shared with workshop participants. This presentation will highlight the goals of this workshop proposal and also provide insights about strategies for funding professional development, impact of workshops on initiating and sustaining undergraduate research programs, and future directions of this program.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
...] Battery-Powered Medical Devices Workshop: Challenges and Opportunities; Public Workshop; Request for.... The Food and Drug Administration (FDA) is announcing the following public workshop entitled ``Battery... create awareness of the challenges related to battery-powered medical devices and collaboratively develop...
Sheltered Workshops; A Handbook. Revised Edition 1966.
ERIC Educational Resources Information Center
National Association of Sheltered Workshops and Homebound Programs, Inc., Washington, DC.
Source material for the establishment and maintenance of sheltered workshop programs is arranged in chronological order. Aspects described include planning considerations, how to get started, program of services, operating the workshop, personnel, state and federal labor laws, workshop standards, and the future of the workshop. Appendixes provide…
77 FR 26509 - Notice of Public Meeting-Cloud Computing Forum & Workshop V
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-04
...--Cloud Computing Forum & Workshop V AGENCY: National Institute of Standards & Technology (NIST), Commerce. ACTION: Notice. SUMMARY: NIST announces the Cloud Computing Forum & Workshop V to be held on Tuesday... workshop. This workshop will provide information on the U.S. Government (USG) Cloud Computing Technology...
Sheltered Workshops and Transition: Old Bottles, New Wine?
ERIC Educational Resources Information Center
Coombe, Edmund
This paper provides a historical overview of sheltered workshops and presents information about service innovations and mission expansion. The first workshop in the United States was the Perkins Institute, opened in 1837 for individuals with visual handicaps. This workshop was typical of "categorical" workshops that were established during this…
Federal Register 2010, 2011, 2012, 2013, 2014
2016-10-04
...] Workshop on Promoting Semantic Interoperability of Laboratory Data; Public Workshop; Request for Comments... Semantic Interoperability of Laboratory Data.'' The purpose of this public workshop is to receive and... Semantic Interoperability of Laboratory Data.'' Received comments will be placed in the docket and, except...
2015 NREL Photovoltaic Reliability Workshops | Photovoltaic Research | NREL
5 NREL Photovoltaic Reliability Workshops 2015 NREL Photovoltaic Reliability Workshops The 2015 NREL Photovoltaic Reliability Workshop was held February 24-27, 2015, in Golden, Colorado. This event be available for download as soon as possible. The Photovoltaic Module Reliability Workshop is
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bennett, Janine Camille; Day, David Minot; Mitchell, Scott A.
This report summarizes the Combinatorial Algebraic Topology: software, applications & algorithms workshop (CAT Workshop). The workshop was sponsored by the Computer Science Research Institute of Sandia National Laboratories. It was organized by CSRI staff members Scott Mitchell and Shawn Martin. It was held in Santa Fe, New Mexico, August 29-30. The CAT Workshop website has links to some of the talk slides and other information, http://www.cs.sandia.gov/CSRI/Workshops/2009/CAT/index.html. The purpose of the report is to summarize the discussions and recap the sessions. There is a special emphasis on technical areas that are ripe for further exploration, and the plans for follow-up amongstmore » the workshop participants. The intended audiences are the workshop participants, other researchers in the area, and the workshop sponsors.« less
Olander, Ellinor; Coates, Rose; Brook, Judy; Ayers, Susan; Salmon, Debra
2018-02-09
This multi-method evaluation assessed the perceived impact of interprofessional workshops targeting enhanced collaboration between healthcare professionals who care for women during and after pregnancy. Current policy recommends partnership working to improve care for women and babies, however, there is little interprofessional education in this area. Five one-day workshops were delivered to 18 healthcare professionals (47.4% of the 38 healthcare professionals registered). The workshop was evaluated through questionnaires before and after the workshop measuring attitudes and willingness towards collaboration; observations of the workshops by a researcher and follow-up interviews 2 months' post-workshop to explore changes in practice. Workshops were attended by midwives, health visitors (trained nurses specialising in community care for children 0-5 years), dietitians, nurses, a general practitioner and a breastfeeding specialist. Attitudes and willingness to participate in interprofessional collaborative practice improved after the workshop. Observations made at the workshop included engaged participants who reported numerous barriers towards collaboration. Follow-up contact with 12 participants identified several examples of collaboration in practice resulting from workshop attendance. These findings suggest that the workshops influenced attendees to change their practice towards more collaborative working. Future work needs to confirm these results with more participants.
NASA Astrophysics Data System (ADS)
MacDonald, R.; Manduca, C. A.; Mogk, D. W.; Tewksbury, B. J.
2004-12-01
Recognizing that many college and university faculty receive little formal training in teaching, are largely unaware of advances in research on teaching and learning, and face a variety of challenges in advancing in academic careers, the National Science Foundation-funded program On the Cutting Edge provides professional development for current and future faculty in the geosciences at various stages in their careers. The program includes a series of six multi-day workshops, sessions and one-day workshops at professional meetings, and a website with information about workshop opportunities and a variety of resources that bring workshop content to faculty (http://serc.carleton.edu/NAGTWorkshops). The program helps faculty improve their teaching and their job satisfaction by providing resources on instructional methods, geoscience content, and strategies for career planning. Workshop and website resources address innovative and effective practices in teaching, course design, delivery of instructional materials, and career planning, as well as approaches for teaching particular topics and strategies for starting and maintaining a research program in various institutional settings. Each year, special workshops for graduate students and post-doctoral fellows interested in academic careers and for early career faculty complement offerings on course design and emerging topics that are open to the full geoscience community. These special workshops include sessions on topics such as dual careers, gender issues, family-work balance, interviewing and negotiating strategies. The workshops serve as opportunities for networking and community building, with participants building connections with other participants as well as workshop leaders. Workshop participants reflect the full range of institutional diversity as well as ethnic and racial diversity beyond that of the geoscience faculty workforce. More than 40 percent of the faculty participants are female. Of the faculty participants in workshops offered July 2002 through June 2004, workshop participants have come from more than 250 colleges and universities in 49 states and the District of Columbia. Workshop evaluations indicate that the workshops are well received with faculty particularly appreciating the content of the workshops and the opportunities for networking. An important aspect of the program is involvement of the geoscience community in workshop leadership. Leadership roles include serving as co-conveners, invited speakers, demonstration leaders, working group leaders, co-conveners of post-workshop sessions at professional meetings, and contributors to the website.
Photovoltaic Reliability Workshop Lodging Information | Photovoltaic
Research | NREL Photovoltaic Reliability Workshop Lodging Information Photovoltaic Reliability Workshop Lodging Information The 2018 Photovoltaic Reliability Workshop (PVRW) will be held Tuesday
2015 IECRE: PV System Certification Workshop | Photovoltaic Research | NREL
IECRE: PV System Certification Workshop 2015 IECRE: PV System Certification Workshop Thursday the guidelines for certifying PV systems. This workshop included an introduction of IECRE followed by discussions targeting the most critical or controversial items. This workshop gathered wide input from the PV
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-03
...: ``Designing for Impact: Workshop on Building the National Network for Manufacturing Innovation'' AGENCY...), housed at the National Institute of Standards and Technology (NIST), announces the first of a series of public workshops entitled ``Designing for Impact: Workshop on Building the National Network for...
Guide to conducting state recycling economic development finance workshops
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-31
The objective of this project was to demonstrate a two-pronged program for educating economic development and recycling officials about recycling business development opportunities. The project consisted of conducting a stat recycling finance workshop in each of three Northeastern states, as well as recycling economic development finance training program for the region`s economic development and recycling officials. The goal of the project is to facilitate the expansion of recycling businesses in the Northeast. The guide details seven steps to conducting a recycling economic development finance workshop: (1) establish a workshop planning committee, (2) select the target audience, (3) develop the workshopmore » message, (4) identify the message deliverer, (5) choose workshop topics and structure the workshop, (6) attract the audience, and (7) Conduct follow-up. In the process of planning and conducting the three state workshops for this project, NERC learned several important lessons: (1) Conduct workshops that are specific to the recycling and economic development programs in the state. (2) Include recycling business case studies on the workshop agenda. (3) Enhance the workshop with recycling economic development finance training. Develop a comprehensive marketing strategy.« less
[Investigation on occupational stress of workers in clean workshops of electric company].
Sun, Ya-qiang; Mao, Li-feng; Feng, Jian-liang; Xu, Bai-qing; Luo, Chen; Ni, Chun-hui
2013-07-01
The aim is to learn the situation of work stress, burnout and depression in clean workshops of electronic company by investigation, and provide the clues for the further interventions as well as the basic data for the future evaluation. The survey was carried out in a electronic company in Xishan,Wuxi city. The subjects including all the 395 employees in clean workshops and 205 in ordinary workshops were asked to fill in an anonymous cross-sectional questionnaire, in which the distributions of age, gender, job duration, working time and working strength were similar between two kinds of workshops. The response rate was 98.9%. There were no significant differences between clean and ordinary workshops in age, gender, smoking, drinking and working hours, except for employed years. It was not found that any differences between two kinds of workshop for the rates of burnout, depression and stress. However, the rates of burnout, depression and stress were 19.7%(77/391), 24.8%(97/391) and 88.5%(346/391) in clean workshops and 19.3%(39/202), 23.8%(48/202) and 84.6%(171/202) in ordinary workshops. There were no significant differences between two workshops for the scores of burnout and depression, but the stress score in clean workshops was higher than that of ordinary workshop (P = 0.015). Further stratified analysis found that stress score of male in clean workshop was higher than that of female (P = 0.002), while it was inverse in ordinary workshops (P = 0.034). In addition, the stress score of male in clean workshops was significantly higher than that of male in ordinary one (P = 0.003). The stress score of workers with age ≥22 year old was higher than that of age <22 in clean workshops, while the stress rate of workers with job duration ≥1.6 years was more than that of those with the shorter job duration. The risk of stress in clean workshops was as 3.78 times as ordinary one and the 95% confidence interval was 1.54∼9.31 after adjusted age and gender. There were negative correlations between stress and society support in both clean and ordinary workshops. The levels of work stress, burnout and depression were high in this electronic company. The stress in clean workshops was more serious than that of ordinary ones, especially for the males.
2011-08-13
CAPE CANAVERAL, Fla. -- Some veteran space shuttle fliers sign autographs and talk with shuttle workers and their families at the “We Made History! Shuttle Program Celebration,” Aug. 13, at the Kennedy Space Center Visitor Complex, Fla. The event was held to honor shuttle workers’ dedication to NASA’s Space Shuttle Program and to celebrate 30 years of space shuttle achievements. The event featured food, music, entertainment, astronaut appearances, educational activities, giveaways, and Starfire Night Skyshow. Photo credit: Jim Grossmann
2011-04-12
CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take center stage to the banners commemorating the orbiters that served the Space Shuttle Program. In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. The event also commemorated the 30th anniversary of the first space shuttle launch with the launch of shuttle Columbia. Photo credit: NASA/Kim Shiflett
History of Space Shuttle Rendezvous
NASA Technical Reports Server (NTRS)
Goodman, John L.
2011-01-01
This technical history is intended to provide a technical audience with an introduction to the rendezvous and proximity operations history of the Space Shuttle Program. It details the programmatic constraints and technical challenges encountered during shuttle development in the 1970s and over thirty years of shuttle missions. An overview of rendezvous and proximity operations on many shuttle missions is provided, as well as how some shuttle rendezvous and proximity operations systems and flight techniques evolved to meet new programmatic objectives. This revised edition provides additional information on Mercury, Gemini, Apollo, Skylab, and Apollo/Soyuz. Some chapters on the Space Shuttle have been updated and expanded. Four special focus chapters have been added to provide more detailed information on shuttle rendezvous. A chapter on the STS-39 mission of April/May 1991 describes the most complex deploy/retrieve mission flown by the shuttle. Another chapter focuses on the Hubble Space Telescope servicing missions. A third chapter gives the reader a detailed look at the February 2010 STS-130 mission to the International Space Station. The fourth chapter answers the question why rendezvous was not completely automated on the Gemini, Apollo, and Space Shuttle vehicles.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, a United Space Alliance (USA) technician briefs NASA Deputy Program Manager of the Space Shuttle Program Michael Wetmore, USA Vice President and Space Shuttle Program Manager Howard DeCastro, and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik on the use of cold plates in Orbiter Processing Facility Bay 2. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro are briefed on the properties of the tile used in the Shuttle's Thermal Protection System (TPS) by USA Manager of the TPS Facility Martin Wilson (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (top) discusses the inner workings of Shuttle Atlantis in Orbiter Processing Facility Bay 1 with a United Space Alliance (USA) technician (bottom). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (right) discusses a speed brake on Shuttle Discovery in Orbiter Processing Facility Bay 3 with a United Space Alliance (USA) technician (left). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Space Shuttle Main Engine Debris Testing Methodology and Impact Tolerances
NASA Technical Reports Server (NTRS)
Gradl, Paul R.; Stephens, Walter
2005-01-01
In the wake of the Space Shuttle Columbia disaster every effort is being made to determine the susceptibility of Space Shuttle elements to debris impacts. Ice and frost debris is formed around the aft heat shield closure of the orbiter and liquid hydrogen feedlines. This debris has been observed to liberate upon lift-off of the shuttle and presents potentially dangerous conditions to the Space Shuttle Main Engine. This paper describes the testing done to determine the impact tolerance of the Space Shuttle Main Engine nozzle coolant tubes to ice strikes originating from the launch pad or other parts of the shuttle.
Stanger-Hall, Kathrin F.; Shockley, Floyd W.; Wilson, Rachel E.
2011-01-01
We implemented a “how to study” workshop for small groups of students (6–12) for N = 93 consenting students, randomly assigned from a large introductory biology class. The goal of this workshop was to teach students self-regulating techniques with visualization-based exercises as a foundation for learning and critical thinking in two areas: information processing and self-testing. During the workshop, students worked individually or in groups and received immediate feedback on their progress. Here, we describe two individual workshop exercises, report their immediate results, describe students’ reactions (based on the workshop instructors’ experience and student feedback), and report student performance on workshop-related questions on the final exam. Students rated the workshop activities highly and performed significantly better on workshop-related final exam questions than the control groups. This was the case for both lower- and higher-order thinking questions. Student achievement (i.e., grade point average) was significantly correlated with overall final exam performance but not with workshop outcomes. This long-term (10 wk) retention of a self-testing effect across question levels and student achievement is a promising endorsement for future large-scale implementation and further evaluation of this “how to study” workshop as a study support for introductory biology (and other science) students. PMID:21633067
NASA Technical Reports Server (NTRS)
1971-01-01
The results are reported of a study to explore the potential cost reductions in the operational ITOS weather satellite program as a consequence of shuttle/bug availability for satellite placement and retrieval, and satellite servicing and maintenance. The study program was divided into shuttle impact on equipment and testing costs, and shuttle impact on overall future ITOS operational program costs, and shuttle impact on configuration. It is concluded that savings in recurring spacecraft costs can be realized in the 1978 ITOS program, if a space shuttle is utilized.
2011-08-13
CAPE CANAVERAL, Fla. -- NASA’s Space Shuttle Program Launch Integration Manager Mike Moses speaks to current and former space shuttle workers and their families during the “We Made History! Shuttle Program Celebration,” Aug. 13, at the Kennedy Space Center Visitor Complex, Fla. The event was held to honor shuttle workers’ dedication to the agency’s Space Shuttle Program and to celebrate 30 years of space shuttle achievements. The event featured food, music, entertainment, astronaut appearances, educational activities, giveaways, and Starfire Night Skyshow. Photo credit: Gianni Woods
2011-08-13
CAPE CANAVERAL, Fla. -- Three-time space shuttle astronaut Charles D. "Sam" Gemar signs autographs and takes photos with space shuttle workers and their families at the “We Made History! Shuttle Program Celebration,” Aug. 13, at the Kennedy Space Center Visitor Complex, Fla. The event was held to honor shuttle workers’ dedication to NASA’s Space Shuttle Program and to celebrate 30 years of space shuttle achievements. The event featured food, music, entertainment, astronaut appearances, educational activities, giveaways, and Starfire Night Skyshow. Photo credit: Jim Grossmann
Shuttle plate braiding machine
NASA Technical Reports Server (NTRS)
Huey, Jr., Cecil O. (Inventor)
1994-01-01
A method and apparatus for moving yarn in a selected pattern to form a braided article. The apparatus includes a segmented grid of stationary support elements and a plurality of shuttles configured to carry yarn. The shuttles are supported for movement on the grid assembly and each shuttle includes a retractable plunger for engaging a reciprocating shuttle plate that moves below the grid assembly. Such engagement at selected times causes the shuttles to move about the grid assembly in a selected pattern to form a braided article of a particular geometry.
77 FR 74829 - Notice of Public Meeting-Cloud Computing and Big Data Forum and Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-18
...--Cloud Computing and Big Data Forum and Workshop AGENCY: National Institute of Standards and Technology... Standards and Technology (NIST) announces a Cloud Computing and Big Data Forum and Workshop to be held on... followed by a one-day hands-on workshop. The NIST Cloud Computing and Big Data Forum and Workshop will...
Achieving Equity in Education Programs for Disabled Women and Girls. A Model Workshop Manual.
ERIC Educational Resources Information Center
Kratovil, Jane; And Others
The model workshop manual is intended for use with state and local special education and sex equity staff. The manual contains a model workshop format, information on problems faced by disabled students, and suggested workshop activities. A sample workshop agenda, accompanying materials and resources developed, compiled, and field-tested at two…
ERIC Educational Resources Information Center
United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand).
This document describes the objectives and focus of a workshop convened by UNESCO in 1982 to design and develop frameworks for training national curriculum specialists, and presents three "workshop products," i.e., reports on policy resulting from the workshop. Part one outlines purpose of the workshop and lists the participants from eight…
Planetary Protection Knowledge Gaps for Human Extraterrestrial Missions Workshop Booklet - 2015
NASA Technical Reports Server (NTRS)
Fonda, Mark L.
2015-01-01
Although NASA's preparations for the Apollo lunar missions had only a limited time to consider issues associated with the protection of the Moon from biological contamination and the quarantine of the astronauts returning to Earth, they learned many valuable lessons (both positive and negative) in the process. As such, those efforts represent the baseline of planetary protection preparations for sending humans to Mars. Neither the post-Apollo experience or the Shuttle and other follow-on missions of either the US or Russian human spaceflight programs could add many additional insights to that baseline. Current mission designers have had the intervening four decades for their consideration, and in that time there has been much learned about human-associated microbes, about Mars, and about humans in space that has helped prepare us for a broad spectrum of considerations regarding potential biological contamination in human Mars missions and how to control it. This paper will review the approaches used in getting this far, and highlight some implications of this history for the future development of planetary protection provisions for human missions to Mars. The role of NASA and ESA's planetary protection offices, and the aegis of COSPAR have been particularly important in the ongoing process.
Radiation risk and human space exploration.
Schimmerling, W; Cucinotta, F A; Wilson, J W
2003-01-01
Radiation protection is essential to enable humans to live and work safely in space. Predictions about the nature and magnitude of the risks posed by space radiation are subject to very large uncertainties. Prudent use of worst-case scenarios may impose unacceptable constraints on shielding mass for spacecraft or habitats, tours of duty of crews on Space Station, and on the radius and duration of sorties on planetary surfaces. The NASA Space Radiation Health Program has been devised to develop the knowledge required to accurately predict and to efficiently manage radiation risk. The knowledge will be acquired by means of a peer-reviewed, largely ground-based and investigator-initiated, basic science research program. The NASA Strategic Plan to accomplish these objectives in a manner consistent with the high priority assigned to the protection and health maintenance of crews will be presented. Published by Elsevier Science Ltd on behalf of COSPAR.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salmi, M.D.
In 1984, the Chiefs of Staff of the US Army and the US Air Force signed a Memorandum of Understanding (MOU) outlining a concept for the joint air defense of overseas air bases. With little previous experience in joint rear-area operations, problems were bound to occur, especially in the area of chemical warfare defense (CWD). The Army bases its CWD doctrine on the concept of maneuver while the Air Force bases its doctrine on being tied to air bases with little or no capability to avoid chemical attacks. Each Service developed its doctrine to support its operational concept. This studymore » compared and contrasted the CWD doctrine of the Army and the Air Force. If found a great deal of commonality exists; however, there are also several problems which could lead to death, injury, and degradation of sortie generation capability.« less
NASA Technical Reports Server (NTRS)
Young, Larry A.; Pisanich, Greg; Ippolito, Corey
2005-01-01
This paper presents recent results from a mission architecture study of planetary aerial explorers. In this study, several mission scenarios were developed in simulation and evaluated on success in meeting mission goals. This aerial explorer mission architecture study is unique in comparison with previous Mars airplane research activities. The study examines how aerial vehicles can find and gain access to otherwise inaccessible terrain features of interest. The aerial explorer also engages in a high-level of (indirect) surface interaction, despite not typically being able to takeoff and land or to engage in multiple flights/sorties. To achieve this goal, a new mission paradigm is proposed: aerial explorers should be considered as an additional element in the overall Entry, Descent, Landing System (EDLS) process. Further, aerial vehicles should be considered primarily as carrier/utility platforms whose purpose is to deliver air-deployed sensors and robotic devices, or symbiotes, to those high-value terrain features of interest.
Radiation risk and human space exploration
NASA Technical Reports Server (NTRS)
Schimmerling, W.; Cucinotta, F. A.; Wilson, J. W.
2003-01-01
Radiation protection is essential to enable humans to live and work safely in space. Predictions about the nature and magnitude of the risks posed by space radiation are subject to very large uncertainties. Prudent use of worst-case scenarios may impose unacceptable constraints on shielding mass for spacecraft or habitats, tours of duty of crews on Space Station, and on the radius and duration of sorties on planetary surfaces. The NASA Space Radiation Health Program has been devised to develop the knowledge required to accurately predict and to efficiently manage radiation risk. The knowledge will be acquired by means of a peer-reviewed, largely ground-based and investigator-initiated, basic science research program. The NASA Strategic Plan to accomplish these objectives in a manner consistent with the high priority assigned to the protection and health maintenance of crews will be presented. Published by Elsevier Science Ltd on behalf of COSPAR.
Radiological operational scenario for a permanent lunar base
NASA Astrophysics Data System (ADS)
McCormack, Percival D.
An operational scenario for a lunar base is postulated based on 30 lunar base personnel and 2 year tours of duty plus stipulated numbers of EVA's and sorties in the lunar rover vehicles. It is also postulated that the main shielding material for the lunar base units (habitats, laboratories, etc.) will be lunar regolith. Using the solar minimum period as the basis, total accumulated dose equivalents for the galactic cosmic radiation over the two year period are computed at various shielding depths. Depths of regolith of over 20 g/sq cm are sufficient to reduce the total dose equivalents to well under the present limits. The second arm of the radiological health strategy -- continuous and all-encompassing radiation dosimetry -- is also discussed in some detail. It is also emphasized that monitoring of the base personnel for genetic mutations and chromosomal aberrations must be part of the radiological health program in the lunar base.
Descent Assisted Split Habitat Lunar Lander Concept
NASA Technical Reports Server (NTRS)
Mazanek, Daniel D.; Goodliff, Kandyce; Cornelius, David M.
2008-01-01
The Descent Assisted Split Habitat (DASH) lunar lander concept utilizes a disposable braking stage for descent and a minimally sized pressurized volume for crew transport to and from the lunar surface. The lander can also be configured to perform autonomous cargo missions. Although a braking-stage approach represents a significantly different operational concept compared with a traditional two-stage lander, the DASH lander offers many important benefits. These benefits include improved crew egress/ingress and large-cargo unloading; excellent surface visibility during landing; elimination of the need for deep-throttling descent engines; potentially reduced plume-surface interactions and lower vertical touchdown velocity; and reduced lander gross mass through efficient mass staging and volume segmentation. This paper documents the conceptual study on various aspects of the design, including development of sortie and outpost lander configurations and a mission concept of operations; the initial descent trajectory design; the initial spacecraft sizing estimates and subsystem design; and the identification of technology needs
NASA Technical Reports Server (NTRS)
Olson, R. L.; Gustan, E. A.; Vinopal, T. J.
1985-01-01
Regenerative life support systems based on the use of biological material was considered for inclusion in manned spacecraft. Biological life support systems are developed in the controlled ecological life support system (CELSS) program. Because of the progress achieved in the CELSS program, it is determined which space missions may profit from use of the developing technology. Potential transportation cost savings by using CELSS technology for selected future manned space missions was evaluated. Six representative missions were selected which ranged from a low Earth orbit mission to those associated with asteroids and a Mars sortie. The crew sizes considered varied from four persons to five thousand. Other study parameters included mission duration and life support closure percentages, with the latter ranging from complete resupply of consumable life support materials to 97% closure of the life support system. The analytical study approach and the missions and systems considered, together with the benefits derived from CELSS when applicable are described.
Next-generation Strategies for Human Lunar Sorties
NASA Technical Reports Server (NTRS)
Cohen, B. A.
2013-01-01
The science community has had success in remote field experiences using two distinctly different models for humans-in-the-loop: the Apollo Science Support team (science backroom), and the robotic exploration of Mars. In the Apollo experience, the science team helped train the crew, designed geologic traverses, and made real-time decisions by reviewing audio and video transmissions and providing recommendations for geologic sampling. In contrast, the Mars Exploration Rover (MER) and Mars Science Lab (MSL) missions have been conducted entirely robotically, with significant time delays between science- driven decisions and remote field activities. Distinctive operations methods and field methodologies were developed for MER/MSL [1,2] because of the reliance on the "backroom" science team (rather than astronaut crew members) to understand the surroundings. Additionally, data are relayed to the team once per day, giving the team many hours or even days to assimilate the data and decide on a plan of action.
CVT/PCS phase 1 integrated testing
NASA Technical Reports Server (NTRS)
Mcbrayer, R. O.; Steadman, J. D.
1973-01-01
Five breadboard experiments representing three Sortie Lab experiment disciplines were installed in a payload carrier simulator. A description of the experiments and the payload carrier simulator was provided. An assessment of the experiment interface with the simulator and an assessment of the simulator experiment support systems were presented. The results indicate that a hardware integrator for each experiment is essential; a crew chief, or mission specialist, for systems management and experimenter liaison is a vital function; a payload specialist is a practical concept for experiment integration and operation; an integration fixture for a complex experiment is required to efficiently integrate the experiment and carrier; simultaneous experiment utilization of simulator systems caused unexpected problems in meeting individual experiment requirements; experimenter traffic inside the dual-floor simulator did not hamper experiment operations; and the requirement for zero-g operation will provide a significant design challenge for some experiments.
Network image data bank prototype: the RSI project (Resume de Sortie Images)
NASA Astrophysics Data System (ADS)
Abouchi, Nacer; Jourlin, Michel; Bohbot, Oriana; Faurie, Catherine; Grisel, Richard
1995-02-01
The Hospital Edouard Herriot in Lyon and 3M company, associated with the Electronic Department of Physics Chimics and Electronic Engineering School (CPE), decided in 1993 to begin a study on a project of image network. This project is composed of many practical applications to be checked one by one. The purpose of this paper is to discuss the context, which is kind of small picture archiving and communication system (PACS), to explain the methodology which has been used related to hardware and software implementation, and to give examples of the first results obtained. One of the main interests of the results is the possibility to obtain on the same support, 3M laser imager, a film including images from different modalities and abstract summing up the patient stay in the hospital. The framework used is built around Omnis7 and C++ language on a PC computer.
INTERIOR OF THE WORKSHOP, LOOKING SOUTH. (On the counter of ...
INTERIOR OF THE WORKSHOP, LOOKING SOUTH. (On the counter of the workshop are instructions and supplies for artificially inseminating pigs.) - Jenne Farm, Workshop, 538 Engle Road, Coupeville, Island County, WA
Introduction to EGU session "Lunar Science and Exploration Towards Moon Village"
NASA Astrophysics Data System (ADS)
Foing, Bernard
2017-04-01
The EGU PS2.2 session "Lunar Science and Exploration" Towards Moon Village" will address: - Recent lunar results: geochemistry, geophysics in the context of open planetary science and exploration - Synthesis of results from SMART-1, Kaguya, Chang'e 1, 2 and 3, Chandrayaan-1, LCROSS, LADEE, Lunar Reconnaissance Orbiter and, Artemis and GRAIL - Goals and Status of missions under preparation: orbiters, Luna-Glob, Google Lunar X Prize, Luna Resurs polar lander, SLIM, Chandrayaan2, Chang'E 4 & 5, Lunar Resource Prospector, Future landers, Lunar sample return missions - Precursor missions, instruments and investigations for landers, rovers, sample return, and human cis-lunar activities and human lunar surface sorties - Preparation for International Lunar Decade: databases, instruments, missions, terrestrial field campaigns, support studies - ILEWG and Global Exploration roadmaps towards a global robotic/human Moon village - Strategic Knowledge Gaps, and key science Goals relevant to Lunar Global Exploration Lunar science and exploration are developing further with new and exciting missions being developed by China, the US, Japan, India, Russia, Korea and Europe, and with new stakeholders. The Moon Village is an open concept proposed by ESA DG with the goal of a sustainable human and robotic presence on the lunar surface as an ensemble where multiple users can carry out multiple activities. Multiple goals of the Moon Village include planetary science, life sciences, astronomy, fundamental research, resources utilisation, human spaceflight, peaceful cooperation, economical development, inspiration, training and capacity building. ESA director general has revitalized and enhanced the original concept of MoonVillage discussed in the last decade. Space exploration builds on international collaboration. COSPAR and its ILEWG International Lunar Exploration Working Group (created in 1994) have fostered collaboration between lunar missions [4-8]. A flotilla of lunar orbiters has flown in the last international lunar decade (SMART-1, Kaguya, Chang'Eal1 &2, Chandrayaan-1, LCROSS, LRO, GRAIL, LADEE). Chinese Chang'E 3 lander and Yutu rover, and upcoming 2017 other landers from 2017 (GLXP, Chang'E 4 & 5, SLIM, Luna , LRP) will constitute a Robotic Village on the Moon. A number of MoonVillage talks and/or interactive jam sessions have been conducted at International workshops and symposia 2016. Moon Village Workshops were held at ESA centres: they were held with senior experts as well as Young ESA professionals to discuss general topics and specific issues ( habitat design, technology, science and precursor missions; public and stakeholder engagement) . Many workshops were complemented with ILEWG EuroMoonMars simulation campaigns. Moon Village Workshops or Jam sessions were also conducted at international symposia or in collaboration with specific universities or institutes. The PS2.2 session will include invited and contributed talks as well as a panel discussion and interactive posters with short oral introduction. Acknowledgements We thank Prof J. Woerner (ESA DG) for energizing the concept of MoonVillage. We thank co-conveners of MoonVillage Workshops and ILEWG EuroMoonMars field campaigns in 2016 (including C. Jonglez, V.Guinet, M.Monnerie, A. Kleinschneider, A. Kapoglou, A. Kolodziejczyk, M. Harasymczuk, I. Schlacht, C. Heinicke, D. Esser, M.Grulich, T. Siruguet, H.Vos, M.Mirino, D.Sokolsky, J.Blamont) and participants to these events. We thank A.Cowley, C. Haigneré, P. Messina, G. Ortega, S.Cristoforetti, ESA colleagues involved in MoonVillage related activities. We thank colleagues from ILEWG, Young Lunar Explorers, the International Lunar Decade Group, the Moon Village Association and Moon Village Support Groups and "MoonVillagers" at large. [1] Jan Wörner, Driving #MoonVillage http://www.iafastro.org/events/iac/iac-2015/plenaryprogramme/the-moon-a-continent-and-a-gateway-for-ourfuture/ (IAC 2015, Jerusalem); [2]http://www.iafastro.org/events/iac/iac2016/globalnetworking-forum/making-the-moon-village-and-marsjourney-accessible-and-affordable-for-all/ (IAC 2016) ; [3] B. Foing et al , Highlights from Moon Village Workshop, held at ESTEC in December 2015, http://www.hou.usra.edu/meetings/lpsc2016/pdf/2719.pdf, http://www.hou.usra.edu/meetings/lpsc2016/pdf/2798.pdf [4] P. Ehrenfreund et al. "Toward a Global Space Exploration Program: A Stepping Stone Approach" (Advances in Space Research, 49, n°1, January 2012), prepared by COSPAR Panel on Exploration (PEX) [5] http://www.lpi.usra.edu/leag/GER_2011.pdf; [6] http://sci.esa.int/ilewg/47170-gluc-iceum11- beijing-2010lunar-declaration/; [7] http://www.lpi.usra.edu/meetings/leagilewg2008/ [8] http://sci.esa.int/ilewg/41506-iceum9-sorrento- 2007-lunar-declaration/ [9] National Research Council (2007), The Scientific Context for Exploration of the Moon [10] P. Ehrenfreund , B.H. Foing, A. Cellino Editors, The Moon and Near Earth Objects), Advances in Space Research, Volume 37, Issue 1, pp 1-192, 2006 [11] http://sci.esa.int/ilewg/38863-iceum8-beijing- 2006declaration/ [12] W. Huntress, D. Stetson, R. Farquhar, J. Zimmerman, B. Clark, W. O'Neil, R. Bourke& B. Foing,'The next steps in exploring deep space - A cosmic study by the IAA', Acta Astronautica, Vol 58, Issues 6-7, 2006, p302-377 [13]http://sci.esa.int/ilewg/38178-iceum7-toronto-2005-declaration/ [14] H. Balsiger et al. Eds, International Lunar Workshop, 1994 May 31-June 3, Beatenberg, Switzerland. Proceedings. Ed. European Space Agency, 1994. ESA-SP-1170 [15] R.M. Bonnet et al, 'Mission to the Moon, Europe's Priorities for Scientific Exploration and Utilisation of the Moon', European Space Agency, ESA SP-1150, June 1992 [16] http://www.iafastro.org/events/iaf-spring-meetings/spring-meetings-2016/ [17] https://www.spacesymposium.org/ [18] http://www.egu2016.eu/ http://meetingorganizer.copernicus.org/EGU2016/session/20378 [19] https://els2016.arc.nasa.gov/ [20] https://nesf2016.arc.nasa.gov/ [21] https://www.cospar-assembly.org/abstractcd/COSPAR-16/ [22] https://www.iac2016.org/, [23] http://www.hou.usra.edu/meetings/leag2016/presentations/ [24] http://newworlds2016.space/ [25] http://www.stx.ox.ac.uk/happ/events/history-moon [26] https://www.cranfield.ac.uk/events/events-2016/manufacturing-2075#
2003-12-19
KENNEDY SPACE CENTER, FLA. -- A United Space Alliance (USA) technician (center) discusses aspects of Shuttle processing performed in the Solid Rocket Booster (SRB) Assembly and Refurbishment Facility (ARF) with NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Space physics strategy: Implementation study. Volume 2: Program plan
NASA Technical Reports Server (NTRS)
1991-01-01
In June, 1989, the Space Science and Applications Advisory Committee (SSAAC) authorized its Space Physics Subcommittee (SPS) to prepare a plan specifying the future missions, launch sequence, and encompassing themes of the Space Physics Division. The plan, now complete, is the product of a year-long study comprising two week-long workshops - in January and June 1990 - assisted by pre-workshop, inter-workshop, and post-workshop preparation and assessment activities. The workshops engaged about seventy participants, drawn equally from the Division's four science disciplines: cosmic and heliospheric physics, solar physics, magnetosphere physics, and ionosphere-thermosphere-mesospheric physics. An earlier report records the outcome of the first workshop; this is the report of the final workshop.
Shuttle Atlantis in Mate-Demate Device Being Loaded onto SCA-747 for Return to Kennedy Space Center
NASA Technical Reports Server (NTRS)
1996-01-01
This photo shows a night view of the orbiter Atlantis being loaded onto one of NASA's Boeing 747 Shuttle Carrier Aircraft (SCA) at the Dryden Flight Research Center, Edwards, California. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
USDA-ARS?s Scientific Manuscript database
The IX Pathology Workshop and VI Molecular Biology Workshop of the International Society of Sugar Cane Technologists (ISSCT) were organised jointly and hosted by the Colombian Sugarcane Research Centre (CENICAÑA) from 23-27 June 2008 at the Radisson Royal Hotel in Cali, Colombia. The Workshop was we...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... series of public workshops entitled ``Designing for Impact: Workshop on Building the National Network for... Education and Workforce Development. The Designing for Impact workshop series is organized by... series will be held on Monday, July 9, 2012 from 8:00 a.m. until 4:30 p.m. Eastern time. Event check-in...
ERIC Educational Resources Information Center
Owen, Rebecca L.; Breyer, Emelita D.
2005-01-01
The Molecular Genetics and Protein Structure and Function workshop is one of a series of workshops offered by the National Science Foundation-funded Center for Workshops in the Chemical Sciences. The workshop provides a hands-on introduction to current topics and techniques in molecular genetics and protein structure/function as applied to…
Skills Analysis. Workshop Package on Skills Analysis, Skills Audit and Training Needs Analysis.
ERIC Educational Resources Information Center
Hayton, Geoff; And Others
This four-part package is designed to assist Australian workshop leaders running 2-day workshops on skills analysis, skills audit, and training needs analysis. Part A contains information on how to use the package and a list of workshop aims. Parts B, C, and D consist, respectively, of the workshop leader's guide; overhead transparency sheets and…
76 FR 60505 - Food Defense Workshop; Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... space available basis on the day of the public workshop beginning at 8 a.m. The cost of registration at... businesses, with firsthand working knowledge of FDA's regulations and compliance policies. This workshop is...
A Death Awareness Workshop: Theory, Application, and Results.
ERIC Educational Resources Information Center
Whelan, W. Michael; Warren, William M.
1980-01-01
Describes an experimental death awareness workshop based on Kubler-Ross' theory. The effects of the workshop reveal cognitive and emotional changes indicating participants in the workshop to be moving towards an acceptance of death. (Author)
Ghosh, Payel; Chandler, Adam G; Altinmakas, Emre; Rong, John; Ng, Chaan S
2016-01-01
The aim of this study was to investigate the feasibility of shuttle-mode computed tomography (CT) technology for body perfusion applications by quantitatively assessing and correcting motion artifacts. Noncontrast shuttle-mode CT scans (10 phases, 2 nonoverlapping bed locations) were acquired from 4 patients on a GE 750HD CT scanner. Shuttling effects were quantified using Euclidean distances (between-phase and between-bed locations) of corresponding fiducial points on the shuttle and reference phase scans (prior to shuttle mode). Motion correction with nonrigid registration was evaluated using sum-of-squares differences and distances between centers of segmented volumes of interest on shuttle and references images. Fiducial point analysis showed an average shuttling motion of 0.85 ± 1.05 mm (between-bed) and 1.18 ± 1.46 mm (between-phase), respectively. The volume-of-interest analysis of the nonrigid registration results showed improved sum-of-squares differences from 2950 to 597, between-bed distance from 1.64 to 1.20 mm, and between-phase distance from 2.64 to 1.33 mm, respectively, averaged over all cases. Shuttling effects introduced during shuttle-mode CT acquisitions can be computationally corrected for body perfusion applications.
2011-04-12
CAPE CANAVERAL, Fla. -- Mike Parrish, space shuttle Endeavour's vehicle manager with United Space Alliance addresses the audience after the announcement that revealed the four institutions that will receive shuttle orbiters for permanent display. In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. The event also commemorated the 30th anniversary of the first space shuttle launch with the launch of shuttle Columbia. Photo credit: NASA/Kim Shiflett
Probabilistic Analysis of Space Shuttle Body Flap Actuator Ball Bearings
NASA Technical Reports Server (NTRS)
Oswald, Fred B.; Jett, Timothy R.; Predmore, Roamer E.; Zaretsky, Erwin V.
2008-01-01
A probabilistic analysis, using the 2-parameter Weibull-Johnson method, was performed on experimental life test data from space shuttle actuator bearings. Experiments were performed on a test rig under simulated conditions to determine the life and failure mechanism of the grease lubricated bearings that support the input shaft of the space shuttle body flap actuators. The failure mechanism was wear that can cause loss of bearing preload. These tests established life and reliability data for both shuttle flight and ground operation. Test data were used to estimate the failure rate and reliability as a function of the number of shuttle missions flown. The Weibull analysis of the test data for the four actuators on one shuttle, each with a 2-bearing shaft assembly, established a reliability level of 96.9 percent for a life of 12 missions. A probabilistic system analysis for four shuttles, each of which has four actuators, predicts a single bearing failure in one actuator of one shuttle after 22 missions (a total of 88 missions for a 4-shuttle fleet). This prediction is comparable with actual shuttle flight history in which a single actuator bearing was found to have failed by wear at 20 missions.
NASA Technical Reports Server (NTRS)
1981-01-01
An overview of the Space Shuttle Program is presented. The missions of the space shuttle orbiters, the boosters and main engine, and experimental equipment are described. Crew and passenger accommodations are discussed as well as the shuttle management teams.
Planned development of the space shuttle vehicle
NASA Technical Reports Server (NTRS)
1972-01-01
Information pertaining to the planned development of the space shuttle vehicle is presented. The package contains: (1) President's statement; (2) Dr. Fletcher's statement; (3) space shuttle fact sheet; (4) important reasons for the space shuttle.
Shuttle Discovery Landing at Palmdale, California, Maintenance Facility
NASA Technical Reports Server (NTRS)
1995-01-01
NASA Dryden Flight Research Center pilot Tom McMurtry lands NASA's Shuttle Carrier Aircraft with Space Shuttle Discovery attached at Rockwell Aerospace's Palmdale, California, facility about 1:00 p.m. Pacific Daylight Time (PDT). There for nine months of scheduled maintenance, Discovery and the 747 were completing a two-day flight from Kennedy Space Center, Florida, that began at 7:04 a.m. Eastern Standard Time on 27 September and included an overnight stop at Salt Lake City International Airport, Utah. At the conclusion of this mission, Discovery had flown 21 shuttle missions, totaling more than 142 days in orbit. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Shuttle Discovery Being Unloaded from SCA-747 at Palmdale, California, Maintenance Facility
NASA Technical Reports Server (NTRS)
1995-01-01
Space Shuttle Discovery being unloaded from NASA's Boeing 747 Shuttle Carrier Aircraft (SCA) at Rockwell Aerospace's Palmdale facility for nine months of scheduled maintenance. Discovery and the 747 were completing a two-day flight from Kennedy Space Center, Florida, that began at 7:04 a.m. Eastern Standard Time on 27 September and included an overnight stop at Salt Lake City International Airport, Utah. At the conclusion of this mission, Discovery had flown 21 shuttle missions, totaling more than 142 days in orbit. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Shuttle Enterprise Mated to 747 SCA for Delivery to Smithsonian
NASA Technical Reports Server (NTRS)
1983-01-01
The Space Shuttle Enterprise atop the NASA 747 Shuttle Carrier Aircraft as it leaves NASA's Dryden Flight Research Center, Edwards, California. The Enterprise, first orbiter built, was not spaceflight rated and was used in 1977 to verify the landing, approach, and glide characteristics of the orbiters. It was also used for engineering fit-checks at the shuttle launch facilities. Following approach and landing tests in 1977 and its use as an engineering vehicle, Enterprise was donated to the National Air and Space Museum in Washington, D.C. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
The flights before the flight - An overview of shuttle astronaut training
NASA Technical Reports Server (NTRS)
Sims, John T.; Sterling, Michael R.
1989-01-01
Space shuttle astronaut training is centered at NASA's Johnson Space Center in Houston, Texas. Each astronaut receives many different types of training from many sources. This training includes simulator training in the Shuttle Mission Simulator, in-flight simulator training in the Shuttle Training Aircraft, Extravehicular Activity training in the Weightless Environment Training Facility and a variety of lectures and briefings. Once the training program is completed each shuttle flight crew is well-prepared to perform the normal operations required for their flight and deal with any shuttle system malfunctions that might occur.
North Region ROW tool implementation workshop.
DOT National Transportation Integrated Search
2010-08-02
Welcome to the North Region ROW Tool Workshop. This workshop is funded under an implementation project sponsored by TxDOTs Research & Technology Implementation Office (RTI). This is the second of four regional workshops being planned for this summ...
Developing workshop module of realistic mathematics education: Follow-up workshop
NASA Astrophysics Data System (ADS)
Palupi, E. L. W.; Khabibah, S.
2018-01-01
Realistic Mathematics Education (RME) is a learning approach which fits the aim of the curriculum. The success of RME in teaching mathematics concepts, triggering students’ interest in mathematics and teaching high order thinking skills to the students will make teachers start to learn RME. Hence, RME workshop is often offered and done. This study applied development model proposed by Plomp. Based on the study by RME team, there are three kinds of RME workshop: start-up workshop, follow-up workshop, and quality boost. However, there is no standardized or validated module which is used in that workshops. This study aims to develop a module of RME follow-up workshop which is valid and can be used. Plopm’s developmental model includes materials analysis, design, realization, implementation, and evaluation. Based on the validation, the developed module is valid. While field test shows that the module can be used effectively.
Chemical Shuttle Additives in Lithium Ion Batteries
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patterson, Mary
2013-03-31
The goals of this program were to discover and implement a redox shuttle that is compatible with large format lithium ion cells utilizing LiNi{sub 1/3}Mn{sub 1/3}Co{sub 1/3}O{sub 2} (NMC) cathode material and to understand the mechanism of redox shuttle action. Many redox shuttles, both commercially available and experimental, were tested and much fundamental information regarding the mechanism of redox shuttle action was discovered. In particular, studies surrounding the mechanism of the reduction of the oxidized redox shuttle at the carbon anode surface were particularly revealing. The initial redox shuttle candidate, namely 2-(pentafluorophenyl)-tetrafluoro-1,3,2-benzodioxaborole (BDB) supplied by Argonne National Laboratory (ANL, Lemont,more » Illinois), did not effectively protect cells containing NMC cathodes from overcharge. The ANL-RS2 redox shuttle molecule, namely 1,4-bis(2-methoxyethoxy)-2,5-di-tert-butyl-benzene, which is a derivative of the commercially successful redox shuttle 2,5-di-tert-butyl-1,4-dimethoxybenzene (DDB, 3M, St. Paul, Minnesota), is an effective redox shuttle for cells employing LiFePO{sub 4} (LFP) cathode material. The main advantage of ANL-RS2 over DDB is its larger solubility in electrolyte; however, ANL-RS2 is not as stable as DDB. This shuttle also may be effectively used to rebalance cells in strings that utilize LFP cathodes. The shuttle is compatible with both LTO and graphite anode materials although the cell with graphite degrades faster than the cell with LTO, possibly because of a reaction with the SEI layer. The degradation products of redox shuttle ANL-RS2 were positively identified. Commercially available redox shuttles Li{sub 2}B{sub 12}F{sub 12} (Air Products, Allentown, Pennsylvania and Showa Denko, Japan) and DDB were evaluated and were found to be stable and effective redox shuttles at low C-rates. The Li{sub 2}B{sub 12}F{sub 12} is suitable for lithium ion cells utilizing a high voltage cathode (potential that is higher than NMC) and the DDB is useful for lithium ion cells with LFP cathodes (potential that is lower than NMC). A 4.5 V class redox shuttle provided by Argonne National Laboratory was evaluated which provides a few cycles of overcharge protection for lithium ion cells containing NMC cathodes but it is not stable enough for consideration. Thus, a redox shuttle with an appropriate redox potential and sufficient chemical and electrochemical stability for commercial use in larger format lithium ion cells with NMC cathodes was not found. Molecular imprinting of the redox shuttle molecule during solid electrolyte interphase (SEI) layer formation likely contributes to the successful reduction of oxidized redox shuttle species at carbon anodes. This helps to understand how a carbon anode covered with an SEI layer, that is supposed to be electrically insulating, can reduce the oxidized form of a redox shuttle.« less
ERIC Educational Resources Information Center
Minton, Gianna; Poh, Anna Norliza Zulkifli; Ngeian, Jenny; Peter, Cindy; Tuen, Andrew Alek
2012-01-01
Community workshops were held in coastal locations in Sarawak to raise awareness of cetacean conservation. Interviews were conducted up to 2 years later in four "workshop communities" as well as four villages where workshops were not conducted. Comparison of responses between respondents who had attended workshops (n = 127) versus those…
Shuttle interaction study extension
NASA Technical Reports Server (NTRS)
1981-01-01
The implications of using the Shuttle with the SOC were analyzed, including constraints that the Shuttle places upon the SOC design. All the considerations involved in the use of the shuttle as a part of the SOC concept were identified.
2001-02-26
The Space Shuttle Atlantis is centered in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Atlantis landed at 12:33 p.m. February 20, 2001, on the runway at Edwards Air Force Base, California, where NASA's Dryden Flight Research Center is located. The mission, which began February 7, logged 5.3 million miles as the shuttle orbited earth while delivering the Destiny science laboratory to the International Space Station. Inclement weather conditions in Florida prompted the decision to land Atlantis at Edwards. The last time a space shuttle landed at Edwards was Oct. 24, 2000.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Manager of the Thermal Protection System (TPS) Facility Martin Wilson (right) briefs NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) on the properties of a thermal blanket used in the Shuttle's TPS. NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (left) discusses some of the working parts inside the nose of Shuttle Discovery in Orbiter Processing Facility Bay 3 with a United Space Alliance (USA) technician (back to camera). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From front row left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons are trained on the proper use of the Emergency Life Support Apparatus (ELSA). NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- From left, NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik and NASA Space Shuttle Program Manager William Parsons each don an Emergency Life Support Apparatus (ELSA) during training on the proper use of the escape devices. NASA and United Space Alliance (USA) Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Teacher Workshops in the US: Goals, Best Practices and Impact
NASA Astrophysics Data System (ADS)
Hörst, S. M.
2011-10-01
The goal of the workshop is to educate the teachers on a few focused topics so that they can transfer the knowledge they gain to their students. We will recruit scientists who are attending the meeting to participate in the workshops and will also pair the teachers with scientists in the field who can serve as a resource for the teacher and their class throughout the school year. The scientists can answer questions the teachers may have, be available to do video lectures or interactive question and answer sessions over skype, and work with the teachers to develop hands-on classroom activities. We will partner closely with EPO professionals in NASA's Science Mission Directorate to ensure that best practices for the workshops are employed, including ensuring that the workshop and workshop materials are designed within the framework of the state standards, surveying participating teachers before the workshops about their needs and goals, assessing the participants pre-workshop knowledge, and engaging participants as learners during the workshop [1]. The impact of the workshop will be increased by providing the teachers and students with a scientist who will serve as a long-term resource. We will maintain contact with the teachers after the workshop to ensure that the scientists are still actively engaged in their classroom and to collect feedback. References [1] Shupla C, et al. (2011) Lessons Learned: Best Practices in Educator Workshops. 42nd Lunar and Planetary Science Conference, no. 2828. EPSC Abstracts Vol. 6, EPSC-DPS2011-1775, 2011 EPSC-DPS Joint Meeting 2011 c Author(s) 2011
Jiang, Luohua; Smith, Matthew Lee; Chen, Shuai; Ahn, SangNam; Kulinski, Kristie P; Lorig, Kate; Ory, Marcia G
2014-01-01
The Chronic Disease Self-Management Program (CDSMP) has been widely disseminated among various racial and ethnic populations. In addition to the six required CDSMP workshop sessions, the delivery sites have the option to offer a Session Zero (or zero class), an information session offered prior to Session One as a marketing tool. Despite assumptions that a zero class is helpful, little is known about the prevalence of these additional sessions or their impact on retaining participants in CDSMP workshops. This study aims to describe the proportion of CDSMP workshops that offered Session Zero and examine the association between Session Zero and workshop completion rates. Data were analyzed from 80,987 middle-aged and older adults collected during a two-year national dissemination of CDSMP. Generalized estimating equation regression analyses were conducted to assess the association between Session Zero and successful workshop completion (attending four or more of the six workshop sessions). On average, 21.04% of the participants attended workshops that offered Session Zero, and 75.33% successfully completed the CDSMP workshop. The participants of the workshops that offered Session Zero had significantly higher odds of completing CDSMP workshops than those who were not offered Session Zero (OR = 1.099, P = <0.001) after controlling for participants' demographic characteristics, race, ethnicity, living status, household income, number of chronic conditions, and workshop delivery type. As one of the first studies reporting the importance of an orientation session for participant retention in chronic disease management intervention projects, our findings suggest offering an orientation session may increase participant retention in similar translational efforts.
Advanced missions safety. Volume 3: Appendices. Part 1: Space shuttle rescue capability
NASA Technical Reports Server (NTRS)
1972-01-01
The space shuttle rescue capability is analyzed as a part of the advanced mission safety study. The subjects discussed are: (1) mission evaluation, (2) shuttle configurations and performance, (3) performance of shuttle-launched tug system, (4) multiple pass grazing reentry from lunar orbit, (5) ground launched ascent and rendezvous time, (6) cost estimates, and (7) parallel-burn space shuttle configuration.
2014 Penn State Bioinorganic Workshop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Golbeck, John
2015-10-01
The 3rd Penn State Bioinorganic Workshop took place in early June 2014 and was combined with the 3rd Penn State Frontiers in Metallobiochemistry Symposium. The workshop was even larger than the 2nd Penn State Bioinorganic Workshop we offered in 2012. It had even more participants (162 rather than 123 in 2012). Like the 2012 workshop, the 2014 workshop had three parts. The first part consisted of 16 90-minute lectures presented by faculty experts on the topic of their expertise (see below). Based on the suggestions from the 2012 workshop, we have recorded all 16 lectures professionally and make them availablemore » to the entire bioinorganic community via online streaming. In addition, hard copies of the recordings are available as backup.« less
Statistical Analysis of CFD Solutions From the Fifth AIAA Drag Prediction Workshop
NASA Technical Reports Server (NTRS)
Morrison, Joseph H.
2013-01-01
A graphical framework is used for statistical analysis of the results from an extensive N-version test of a collection of Reynolds-averaged Navier-Stokes computational fluid dynamics codes. The solutions were obtained by code developers and users from North America, Europe, Asia, and South America using a common grid sequence and multiple turbulence models for the June 2012 fifth Drag Prediction Workshop sponsored by the AIAA Applied Aerodynamics Technical Committee. The aerodynamic configuration for this workshop was the Common Research Model subsonic transport wing-body previously used for the 4th Drag Prediction Workshop. This work continues the statistical analysis begun in the earlier workshops and compares the results from the grid convergence study of the most recent workshop with previous workshops.
Child restraint workshop series. Volume 1
DOT National Transportation Integrated Search
1979-09-01
This final report describes the planning and implementing details of the Child Restraint Workshop series. A child restraint workshop was conducted in each of the : ten NHTSA regions. The purpose of the workshops was to improve the effectiveness of gr...
77 FR 14813 - Public Workshop on Minimal Residual Disease; Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... the American Society of Clinical Oncology and will be the first in a series of workshops intended to.... This workshop is part of a series in which FDA's Office of Hematology and Oncology Products will...
Region IV Transit Workshop: Harnessing the Private Sector
DOT National Transportation Integrated Search
1988-09-01
This Report constitutes the Proceedings of the Region IV Transit Workshop: : Harnessing the Private Sector. Included in this document is a general report of : the activities of the Workshop. : The purpose ot the Region IV Transit Workshop: Harnessing...
Al-Khan, A; Aye, IL; Barsoum, I; Borbely, A; Cebral, E; Cerchi, G; Clifton, VL; Collins, S; Cotechini, T; Davey, A; Flores-Martin, J; Fournier, T; Franchi, AM; Fretes, RE; Graham, CH; Godbole, G; Hansson, SR; Headley, PL; Ibarra, C; Jawerbaum, A; Kemmerling, U; Kudo, Y; Lala, PK; Lassance, L; Lewis, RM; Menkhorst, E; Morris, C; Nobuzane, T; Ramos, G; Rote, N; Saffery, R; Salafia, C; Sarr, D; Schneider, H; Sibley, C; Singh, AT; Sivasubramaniyam, TS; Soares, MJ; Vaughan, O; Zamudio, S; Lash, GE
2016-01-01
Workshops are an important part of the IFPA annual meeting. At IFPA Meeting 2010 diverse topics were discussed in twelve themed workshops, six of which are summarized in this report. 1. The placental pathology workshop focused on clinical correlates of placenta accreta/percreta. 2. Mechanisms of regulation of trophoblast invasion and spiral artery remodeling were discussed in the trophoblast invasion workshop. 3. The fetal sex and intrauterine stress workshop explored recent work on placental sex differences and discussed them in the context of whether boys live dangerously in the womb. 4. The workshop on parasites addressed inflammatory responses as a sign of interaction between placental tissue and parasites. 5. The decidua and embryonic/fetal loss workshop focused on key regulatory mediators in the decidua, embryo and fetus and how alterations in expression may contribute to different diseases and adverse conditions of pregnancy. 6. The trophoblast differentiation and syncytialisation workshop addressed the regulation of villous cytotrophoblast differentiation and how variations may lead to placental dysfunction and pregnancy complications. PMID:21236487
Payload test philosophy. [to provide confidence in Shuttle structural math models
NASA Technical Reports Server (NTRS)
Mayhew, D.
1979-01-01
Shuttle payload test philosophy is discussed with reference to testing to provide confidence in Shuttle structural math models. Particular attention is given the Shuttle quarter-scale program and the Mated Vertical Ground Vibration Test Program.
7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS ...
7. YOSEMITE VALLEY SHUTTLE BUS AT SENTINEL BRIDGE SHUTTLE BUS AND PARKING LOT AREA. LOOKING WNW. GIS: N-37 40 36.2 / W-119 44 45.0 - Yosemite National Park Roads & Bridges, Yosemite Village, Mariposa County, CA
2011-04-12
CAPE CANAVERAL, Fla. -- Kennedy Center Director Bob Cabana addresses the audience after the announcement that revealed the four institutions that will receive shuttle orbiters for permanent display. In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. The event also commemorated the 30th anniversary of the first space shuttle launch with the launch of shuttle Columbia. Photo credit: NASA/Kim Shiflett
2011-04-12
CAPE CANAVERAL, Fla. -- Kennedy Center Director Bob Cabana appears pleased that Kennedy was awarded shuttle Atlantis to be displayed permanently in Florida. In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. The event also commemorated the 30th anniversary of the first space shuttle launch with the launch of shuttle Columbia. Photo credit: NASA/Kim Shiflett
2011-04-12
CAPE CANAVERAL, Fla. -- Shuttle Atlantis' three main engines take center stage to the banners commemorating the orbiters that served the Space Shuttle Program. In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. Later, employees, their families and friends, will celebrate the 30th anniversary of the first shuttle launch at the visitor complex. Photo credit: NASA/Kim Shiflett
Restartable solid motor stage for shuttle applications
NASA Technical Reports Server (NTRS)
Rohrbaugh, D. J.
1973-01-01
The application of restartable solid motor stages to shuttle missions has been shown to provide a viable supplement to the shuttle program. Restartable solid motors in the 3000 pound class provide a small expendable transfer stage that reduces the demand on the shuttle for the lower energy missions. Shuttle operational requirements and preliminary performance data provided an input for defining design features required for restartable solid motor applications. These data provided a basis for a configuration definition that is compatible with shuttle operations. Mission by mission analysis showed the impact on a NASA supplied mission model. The results showed a 15% reduction in the number of shuttle flights required. In addition the amount of shuttle capability used to complete the mission objectives was significantly reduced. For example, in the 1979 missions there was a 62% reduction in shuttle capability used. The study also showed that the solid motor could provide a supplement to the TUG that would allow TUGS to be used in a recoverable rather than an expendable mode. The study shows a 71% reduction in the number of TUGs that would be expended.
Enterprise - First Tailcone Off Free Flight
NASA Technical Reports Server (NTRS)
1977-01-01
The Space Shuttle prototype Enterprise flies free after being released from NASA's 747 Shuttle Carrier Aircraft (SCA) to begin a powerless glide flight back to NASA's Dryden Flight Research Center, Edwards, California, on its fourth of the five free flights in the Shuttle program's Approach and Landing Tests (ALT), 12 October 1977. The tests were carried out at Dryden to verify the aerodynamic and control characteristics of the orbiters in preperation for the first space mission with the orbiter Columbia in April 1981. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Shuttle in Mate-Demate Device being Loaded onto SCA-747
NASA Technical Reports Server (NTRS)
1991-01-01
At NASA's Ames-Dryden Flight Research Facility (later redesignated Dryden Flight Research Center), Edwards, California, technicians begin the task of mounting the Space Shuttle Atlantis atop NASA's 747 Shuttle Carrier Aircraft (NASA #911) for the ferry flight back to the Kennedy Space Center, Florida, following its STS-44 flight 24 November - 1 December 1991. Post-flight servicing of the orbiters, and the mating operation, is carried out at Dryden at the Mate-Demate Device (MDD), the large gantry-like structure that hoists the spacecraft to various levels during post-space flight processing and attachment to the 747. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Shuttle Columbia Post-landing Tow - with Reflection in Water
NASA Technical Reports Server (NTRS)
1982-01-01
A rare rain allowed this reflection of the Space Shuttle Columbia as it was towed 16 Nov. 1982, to the Shuttle Processing Area at NASA's Ames-Dryden Flight Research Facility (from 1976 to 1981 and after 1994, the Dryden Flight Research Center), Edwards, California, following its fifth flight in space. Columbia was launched on mission STS-5 11 Nov. 1982, and landed at Edwards Air Force Base on concrete runway 22. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines withtwo solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. MartinMarietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Workshop on Fuzzy Control Systems and Space Station Applications
NASA Technical Reports Server (NTRS)
Aisawa, E. K. (Compiler); Faltisco, R. M. (Compiler)
1990-01-01
The Workshop on Fuzzy Control Systems and Space Station Applications was held on 14-15 Nov. 1990. The workshop was co-sponsored by McDonnell Douglas Space Systems Company and NASA Ames Research Center. Proceedings of the workshop are presented.
76 FR 35024 - National Institute of Justice Stab-Resistant Body Armor Standard Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-15
.... Space is limited at this workshop, and as a result, only 50 participants will be allowed to register. We.../2011_NIJ_Stab-resistant_BA_Workshop.aspx . Registration will close on July 8, 2011. DATES: The workshop...
A Physics Workshop in Hispaniola.
ERIC Educational Resources Information Center
Little, R. N.
1983-01-01
Describes two workshops for physics teachers in Hispaniola. Workshops demonstrated how mechanics could be developed from planetary motions and how basic mechanics concepts could be introduced through a guided discovery approach. Comments on workshop activities, organization, participant attitudes, and physics curriculum/instruction in Hispaniola…
DOT National Transportation Integrated Search
2005-05-01
This report documents the development and presentation of the workshop titled Thinking Beyond the Pavement A Workshop on Context Sensitive Design. Work began on the workshop development in 1998 after the Kentucky Transportation Cabinet was ...
Lessons Learned and Future Goals of the High Lift Prediction Workshops
NASA Technical Reports Server (NTRS)
Rumsey, Christopher L.; Lee-Rausch, Elizabeth; Slotnick, Jeffrey P.
2016-01-01
The American Institute of Aeronautics and Astronautics (AIAA) High Lift Prediction Workshop series is described. Two workshops have been held to date. Major conclusions are summarized, and plans for future workshops are outlined. A compilation of lessons learned from the first two workshops is provided. This compilation includes a summary of needs for future high-lift experiments that are intended for computational fluid dynamics (CFD) validation.
National Centers for Environmental Prediction
Ensemble Users Meetings 7th NCEP/NWS Ensemble User Workshop 13-15 June 2016 6th NCEP/NWS Ensemble User Workshop 25 - 27 March 2014 5th NCEP/NWS Ensemble User Workshop 10 - 12 May, 2011 4th NCEP/NWS Ensemble User Workshop 13 - 15 May, 2008 3rd NCEP/NWS Ensemble User Workshop 31 Oct - 2 Nov, 2006 2nd NCEP/NWS
Final Technical Report: Electronic Structure Workshop (ES13)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, Shiwei
The 25th Annual Workshop on Recent Developments in Electronic Structure Methods (ES2013) was successfully held at the College of William & Mary in Williamsburg VA on June 11-14, 2013. The workshop website is at http://es13.wm.edu/ , which contains updated information on the workshop and a permanent archive of the scientific contents. DOE's continued support has been instrumental to the success of the workshop.
2016 FACET-II Science Workshop Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hogan, Mark J.
The second in a series of FACET-II Science Workshops was held at SLAC National Accelerator Laboratory on October 17-19, 2016 [1]. The workshop drew thirty-five participants from eighteen different institutions including CERN, DESY, Ecole Polytechnique, FNAL, JAI, LBNL, LLNL, Radiabeam, Radiasoft, SLAC, Stony Brook, Strathclyde, Tech-X, Tsinghua, UC Boulder, UCLA and UT Austin. The 2015 workshop [2, 3] helped prioritize research directions for FACET-II. The 2016 workshop was focused on understanding what improvements are needed at the facility to support the next generation of experiments. All presentations are linked to the workshop website as a permanent record.
Report on a NASA astrobiology institute-funded workshop without walls: stellar stoichiometry.
Desch, Steven J; Young, Patrick A; Anbar, Ariel D; Hinkel, Natalie; Pagano, Michael; Truitt, Amanda; Turnbull, Margaret
2014-04-01
We report on the NASA Astrobiology Institute-funded Workshop Without Walls entitled "Stellar Stoichiometry," hosted by the "Follow the Elements" team at Arizona State University in April 2013. We describe several innovative practices we adopted that made effective use of the Workshop Without Walls videoconferencing format, including use of information technologies, assignment of scientific tasks before the workshop, and placement of graduate students in positions of authority. A companion article will describe the scientific results arising from the workshop. Our intention here is to suggest best practices for future Workshops Without Walls.
Multiphase Flow in Power and Propulsion Workshop Fluid Stability and Dynamics Workshop: Overview
NASA Technical Reports Server (NTRS)
McQuillen, John
2003-01-01
The short term purpose of the workshop described by this viewgraph presentation is to present a research plan and a 'roadmap' developed for strategic research for the Office of Biological and Physical Research. The long term purpose of the workshop is to conduct necessary ground-based and space-flight low gravity experiments, complemented by analyses, resulting in a documented framework for parameter prediction of needed by designers. The presentation reviews several previous workshops which were similar, and describes the differences in this workshop. The presentation also includes a prioritizing scheme for microgravity issues, which includes four priority ratings.
The Assessment and Management of Suicide Risk: State of Workshop Education
Pisani, Anthony R.; Cross, Wendi F.; Gould, Madelyn S.
2012-01-01
A systematic search of popular and scholarly databases identified workshops that addressed general clinical competence in the assessment or management of suicide risk, targeted mental health professionals, and had at least one peerreviewed publication. We surveyed workshop developers and examined empirical articles associated with each workshop. The state of workshop education is characterized by presenting the learning objectives, educational formats, instructor factors, and evaluation studies. Workshops are efficacious for transferring knowledge and shifting attitudes; however, their role in improving clinical care and outcomes of suicidal patients has yet to be determined. PMID:21477093
Environmental Virology Workshop Summary, Tucson, Arizona, Jan 7-12, 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, Matthew
Full Text of the report: A total of 66 researchers participated in this workshop, including 44 attendees, 3 program officers from private and federal funding agencies, and 19 workshop teachers. The workshop was incredibly productive and focused on identifying knowledge-gaps critical for predictive modeling, and developing the framework (experimental, informatic, theoretical) needed to obtain the data. All attendees developed a strong foundation in cutting-edge methods and a network of researchers that are now aiding in advancing environmental virology research. To more broadly reach Environmental Virologists, a subset of the attendees since proposed and ran a viromics workshop at the Americanmore » Society of Microbiology meeting in 2014 in Boston, MA where the workshop sold-out. The workshop proposal was accepted again by ASM and is scheduled to occur at the New Orleans meeting in May, 2015. Additionally, PI Sullivan is co-convening a ''Viromics: Tools and Concepts'' session at the FEMS meeting in the Netherlands in June 2015 to continue getting the word out about Environmental Virology. A second formal Environmental Virology Workshop is being planned to occur in Scotland in summer 2016, likely held jointly with the Aquatic Virology Workshop. I wish to thank DOE for their critical support for this workshop which has helped galvanize the field.« less
Nearfield Summary and Statistical Analysis of the Second AIAA Sonic Boom Prediction Workshop
NASA Technical Reports Server (NTRS)
Park, Michael A.; Nemec, Marian
2017-01-01
A summary is provided for the Second AIAA Sonic Boom Workshop held 8-9 January 2017 in conjunction with AIAA SciTech 2017. The workshop used three required models of increasing complexity: an axisymmetric body, a wing body, and a complete configuration with flow-through nacelle. An optional complete configuration with propulsion boundary conditions is also provided. These models are designed with similar nearfield signatures to isolate geometry and shock/expansion interaction effects. Eleven international participant groups submitted nearfield signatures with forces, pitching moment, and iterative convergence norms. Statistics and grid convergence of these nearfield signatures are presented. These submissions are propagated to the ground, and noise levels are computed. This allows the grid convergence and the statistical distribution of a noise level to be computed. While progress is documented since the first workshop, improvement to the analysis methods for a possible subsequent workshop are provided. The complete configuration with flow-through nacelle showed the most dramatic improvement between the two workshops. The current workshop cases are more relevant to vehicles with lower loudness and have the potential for lower annoyance than the first workshop cases. The models for this workshop with quieter ground noise levels than the first workshop exposed weaknesses in analysis, particularly in convective discretization.
Wings In Orbit: Scientific and Engineering Legacies of the Space Shuttle
NASA Technical Reports Server (NTRS)
Hale, N. Wayne (Editor); Lulla, Kamlesh (Editor); Lane, Helen W. (Editor); Chapline, Gail (Editor)
2010-01-01
This Space Shuttle book project reviews Wings In Orbit-scientific and engineering legacies of the Space Shuttle. The contents include: 1) Magnificent Flying Machine-A Cathedral to Technology; 2) The Historical Legacy; 3) The Shuttle and its Operations; 4) Engineering Innovations; 5) Major Scientific Discoveries; 6) Social, Cultural, and Educational Legacies; 7) Commercial Aerospace Industries and Spin-offs; and 8) The Shuttle continuum, Role of Human Spaceflight.
Space Operations Center, shuttle interaction study, volume 1
NASA Technical Reports Server (NTRS)
1981-01-01
The implication of using the Shuttle with the SOC, including constraints that the Shuttle places upon the SOC design is studied. The considerations involved in the use of the Shuttle as a part of the SOC concept, and the constraints to the SOC imposed by the Shuttle in its interactions with the SOC, and on the design or technical solutions which allow satisfactory accomplishment of the interactions are identified.
1993-04-07
A NASA CV-990, modified as a Landing Systems Research Aircraft (LSRA), in flight over NASA's Dryden Flight Research Center, Edwards, California, for a test of the space shuttle landing gear system. The space shuttle landing gear test unit, operated by a high-pressure hydraulic system, allowed engineers to assess and document the performance of space shuttle main and nose landing gear systems, tires and wheel assemblies, plus braking and nose wheel steering performance. The series of 155 test missions for the space shuttle program provided extensive data about the life and endurance of the shuttle tire systems and helped raise the shuttle crosswind landing limits at Kennedy.
1993-04-07
A NASA CV-990, modified as a Landing Systems Research Aircraft (LSRA), in flight over NASA's Dryden Flight Research Center, Edwards, California, for a test of the space shuttle landing gear system. The space shuttle landing gear test unit, operated by a high-pressure hydraulic system, allowed engineers to assess and document the performance of space shuttle main and nose landing gear systems, tires and wheel assemblies, plus braking and nose wheel steering performance. The series of 155 test missions for the space shuttle program provided extensive data about the life and endurance of the shuttle tire systems and helped raise the shuttle crosswind landing limits at Kennedy.
Lucas, Rochelle Irene; Promentilla, Michael Angelo; Ubando, Aristotle; Tan, Raymond Girard; Aviso, Kathleen; Yu, Krista Danielle
2017-08-01
The emergence of information and communication technology (ICT) has created opportunities for enhancing the learning process at different educational levels. However, its potential benefits can only be fully realized if teachers are properly trained to utilize such tools. The rapid evolution of ICT also necessitates rigorous assessment of training programs by participants. Thus, this study proposes an evaluation framework based on the Analytic Hierarchy Process (AHP) to systematically evaluate such workshops designed for teachers. The evaluation model is decomposed hierarchically into four main criteria namely: (1) workshop design, (2) quality of content of the workshop, (3) quality of delivery of the content of the workshop, and the (4) relevance of the workshop. These criteria are further disaggregated into 24 sub-indicators to measure the effectiveness of the workshop as perceived by the participants based on their own expectations. This framework is applied to a case study of ICT workshops done in the Philippines. In this case, relevance of the workshop is found to be the most important main criterion identified by the participants, particularly on the new ICT knowledge that promotes teachers' professional growth and development. The workshop evaluation index (WEI) is also proposed as a metric to support decision-making by providing a mechanism for benchmarking performance, tracking improvement over time, and developing strategies for the design and improvement of training programs or workshops on ICT for teachers. Copyright © 2017 Elsevier Ltd. All rights reserved.
Hands-On Surgical Training Workshop: an Active Role-Playing Patient Education for Adolescents.
Wongkietkachorn, Apinut; Boonyawong, Pangpoom; Rhunsiri, Peera; Tantiphlachiva, Kasaya
2017-09-01
Most patient education involves passive learning. To improve patient education regarding surgery, an active learning workshop-based teaching method is proposed. The objective of this study was to assess level of patient surgical knowledge, achievement of workshop learning objectives, patient apprehension about future surgery, and participant workshop satisfaction after completing a surgical training workshop. A four-station workshop (surgical scrub, surgical suture, laparoscopic surgery, and robotic surgery) was developed to teach four important components of the surgical process. Healthy, surgery-naive adolescents were enrolled to attend this 1-h workshop-based training program. Training received by participants was technically and procedurally identical to training received by actual surgeons. Pre- and post-workshop questionnaires were used to assess learning outcomes. There were 1312 participants, with a mean age 15.9 ± 1.1 years and a gender breakdown of 303 males and 1009 females. For surgical knowledge, mean pre-workshop and post-workshop scores were 6.1 ± 1.5 and 7.5 ± 1.5 (out of 10 points), respectively (p < 0.001). Out of 5 possible points, achievement of learning objectives, decreased apprehension about future surgery, and overall workshop satisfaction scores were all higher than 4.5. Active, hands-on patient education is an effective way to improve understanding of surgery-related processes. This teaching method may also decrease apprehension that patients or potential patients harbor regarding a future surgical procedure.
A New Immunologic Method for Detection of Occult Breast Cancer
1999-09-01
in Workshop on Melanoma Monoclonal Antibodies, NIH. 1981 Workshop on ELISA, Cordia Laboratories, Culver City, invited Faculty. 1982 Invited Faculty...for Workshop on Practical Aspects of ELISA, Cordia Laboratories. 1983 Invited Faculty for Workshop on Melanoma Immunology, European Soc for
Array Funded Projects Geochronology Synthesis Workshops Scientific Publications Science Nuggets ES Synthesis Workshop 06-12 | 06-14 IRIS Workshop: Foundations, Frontiers, and Future Facilities for Seismology 06-15 | Call for Science Nuggets this spring! 07-26 | 07-28 Midcontinent Rift Synthesis Workshop See
Veterinary Immunology Committee Toolkit Workshop 2010: Progress and plans
USDA-ARS?s Scientific Manuscript database
The Third Veterinary Immunology Committee (VIC) Toolkit Workshop took place at the Ninth International Veterinary Immunology Symposium (IVIS) in Tokyo, Japan on August 18, 2020. The Workshop built on previous Toolkit Workshops and covered various aspects of reagent development, commercialisation an...
Child restraint workshop series. Volume 2, Ongoing and planned programs
DOT National Transportation Integrated Search
1979-09-01
This final report describes the planning and implementing details of the Child Restraint Workshop series. A child restraint workshop was conducted in each of the : ten NHTSA regions. The purpose of the workshops was to improve the effectiveness of gr...
OMLTA Workshop Booklet, 1978-1979.
ERIC Educational Resources Information Center
Ohio Modern Language Teachers Association, Columbus.
This booklet is a guideline to those interested in the Ohio Modern Language Teachers Association Workshops. Outlined are the membership policies, responsibilities of the local workshop director, guidelines for selecting consultants, site selection, publicity guidelines, and OMLTA workshops and consultants. A complete description of each workshop…
77 FR 46096 - Statistical Process Controls for Blood Establishments; Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-02
...] Statistical Process Controls for Blood Establishments; Public Workshop AGENCY: Food and Drug Administration... workshop entitled: ``Statistical Process Controls for Blood Establishments.'' The purpose of this public workshop is to discuss the implementation of statistical process controls to validate and monitor...
Jiang, Luohua; Smith, Matthew Lee; Chen, Shuai; Ahn, SangNam; Kulinski, Kristie P.; Lorig, Kate; Ory, Marcia G.
2015-01-01
Background: The Chronic Disease Self-Management Program (CDSMP) has been widely disseminated among various racial and ethnic populations. In addition to the six required CDSMP workshop sessions, the delivery sites have the option to offer a Session Zero (or zero class), an information session offered prior to Session One as a marketing tool. Despite assumptions that a zero class is helpful, little is known about the prevalence of these additional sessions or their impact on retaining participants in CDSMP workshops. This study aims to describe the proportion of CDSMP workshops that offered Session Zero and examine the association between Session Zero and workshop completion rates. Methods: Data were analyzed from 80,987 middle-aged and older adults collected during a two-year national dissemination of CDSMP. Generalized estimating equation regression analyses were conducted to assess the association between Session Zero and successful workshop completion (attending four or more of the six workshop sessions). Results: On average, 21.04% of the participants attended workshops that offered Session Zero, and 75.33% successfully completed the CDSMP workshop. The participants of the workshops that offered Session Zero had significantly higher odds of completing CDSMP workshops than those who were not offered Session Zero (OR = 1.099, P = <0.001) after controlling for participants’ demographic characteristics, race, ethnicity, living status, household income, number of chronic conditions, and workshop delivery type. Conclusion: As one of the first studies reporting the importance of an orientation session for participant retention in chronic disease management intervention projects, our findings suggest offering an orientation session may increase participant retention in similar translational efforts. PMID:25964918
NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Endeavour on top lifts of
NASA Technical Reports Server (NTRS)
2001-01-01
NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Endeavour on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida.
Optimizing the Space Transportation System
1982-12-01
the entire gamut of inclinations and altitudes. The Shuttle payload mass and the total Station, OTV and Shuttle propellant mass required in orbit are...military satellites across the entire gamut of inclinations and altitudes. The total Station, OTV, Shuttle propellant and Shuttle payload mass required in
Incorporating Bioenergy in Sustainable Landscape Designs Workshop Two: Agricultural Landscapes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Negri, M. Cristina; Ssegane, H.
The Bioenergy Technologies Office hosted two workshops on Incorporating Bioenergy in Sustainable Landscape Designs with Oak Ridge and Argonne National Laboratories in 2014. The second workshop focused on agricultural landscapes and took place in Argonne, IL from June 24—26, 2014. The workshop brought together experts to discuss how landscape design can contribute to the deployment and assessment of sustainable bioenergy. This report summarizes the discussions that occurred at this particular workshop.
The U.S.-India Relationship: Cross-Sector Collaboration to Promote Sustainable Development
2014-09-01
Development—Rationale for the Workshop and Overview of the Volume .....1 Michael J. Fratantuono PART I: WORKSHOP PAPERS AND DISCUSSANTS’ COMMENTS...time the leading expert at the SSI in the area of South Asia, who indicated his willingness to write a paper , to participate in the workshop, and...take to record the workshop proceedings effectively. Mr. Ryan Burke, Web De- velopment Specialist, helped us set up the workshop website that we
2005-03-29
Brig. Gen. Curtis Bedke, commander of the Air Force Flight Test Center at Edwards Air Force Base, received some first-hand insight on how to fly a Space Shuttle approach and landing, courtesy of NASA astronaut and STS-114 mission commander Eileen Collins. The series of proficiency flights in NASA's modified Grumman Gulfstream-II Shuttle Training Aircraft were in preparation for the STS-114 mission with the shuttle Discovery. Although NASA's Kennedy Space Center in Florida is the primary landing site for Space Shuttle missions, flight crews also practice the shuttle's steep approach and landing at Edwards in case weather or other situations preclude a landing at the Florida site and force a diversion to Edwards AFB.
Parking Lot and Public Viewing Area for STS-4 Landing
NASA Technical Reports Server (NTRS)
1982-01-01
This aerial photo shows the large crowd of people and vehicles that assembled to watch the landing of STS-4 at Edwards Air Force Base in California in July 1982. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Mission Possible: BioMedical Experiments on the Space Shuttle
NASA Technical Reports Server (NTRS)
Bopp, E.; Kreutzberg, K.
2011-01-01
Biomedical research, both applied and basic, was conducted on every Shuttle mission from 1981 to 2011. The Space Shuttle Program enabled NASA investigators and researchers from around the world to address fundamental issues concerning living and working effectively in space. Operationally focused occupational health investigations and tests were given priority by the Shuttle crew and Shuttle Program management for the resolution of acute health issues caused by the rigors of spaceflight. The challenges of research on the Shuttle included: limited up and return mass, limited power, limited crew time, and requirements for containment of hazards. The sheer capacity of the Shuttle for crew and equipment was unsurpassed by any other launch and entry vehicle and the Shuttle Program provided more opportunity for human research than any program before or since. To take advantage of this opportunity, life sciences research programs learned how to: streamline the complicated process of integrating experiments aboard the Shuttle, design experiments and hardware within operational constraints, and integrate requirements between different experiments and with operational countermeasures. We learned how to take advantage of commercial-off-the-shelf hardware and developed a hardware certification process with the flexibility to allow for design changes between flights. We learned the importance of end-to-end testing for experiment hardware with humans-in-the-loop. Most importantly, we learned that the Shuttle Program provided an excellent platform for conducting human research and for developing the systems that are now used to optimize research on the International Space Station. This presentation will include a review of the types of experiments and medical tests flown on the Shuttle and the processes that were used to manifest and conduct the experiments. Learning Objective: This paper provides a description of the challenges related to launching and implementing biomedical experiments aboard the Space Shuttle.
Legacy of Biomedical Research During the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Hayes, Judith C.
2011-01-01
The Space Shuttle Program provided many opportunities to study the role of spaceflight on human life for over 30 years and represented the longest and largest US human spaceflight program. Outcomes of the research were understanding the effect of spaceflight on human physiology and performance, countermeasures, operational protocols, and hardware. The Shuttle flights were relatively short, < 16 days and routinely had 4 to 6 crewmembers for a total of 135 flights. Biomedical research was conducted on the Space Shuttle using various vehicle resources. Specially constructed pressurized laboratories called Spacelab and SPACEHAB housed many laboratory instruments to accomplish experiments in the Shuttle s large payload bay. In addition to these laboratory flights, nearly every mission had dedicated human life science research experiments conducted in the Shuttle middeck. Most Shuttle astronauts participated in some life sciences research experiments either as test subjects or test operators. While middeck experiments resulted in a low sample per mission compared to many Earth-based studies, this participation allowed investigators to have repetition of tests over the years on successive Shuttle flights. In addition, as a prelude to the International Space Station (ISS), NASA used the Space Shuttle as a platform for assessing future ISS hardware systems and procedures. The purpose of this panel is to provide an understanding of science integration activities required to implement Shuttle research, review biomedical research, characterize countermeasures developed for Shuttle and ISS as well as discuss lessons learned that may support commercial crew endeavors. Panel topics include research integration, cardiovascular physiology, neurosciences, skeletal muscle, and exercise physiology. Learning Objective: The panel provides an overview from the Space Shuttle Program regarding research integration, scientific results, lessons learned from biomedical research and countermeasure development.
NASA Astrophysics Data System (ADS)
DeSilva, L. Ajith; Pullen, Adam; Hasbun, J. E.
2018-05-01
This article examines the effect of voluntary workshops on students’ performance in a university for algebra-based introductory physics on the topics of electricity, magnetism and related areas. A workshop is an optional one-hour-per-week session that promotes a small group’s peer instruction and co-operative learning, in order to enhance the conceptual understanding of physical principles and to improve problem-solving skills. During the workshops, a small group of students were encouraged to exchange ideas in a co-operative learning environment. Most students enrolled were poorly motivated, underprepared, and did not possess the prerequisite mathematics needed. For those who attended workshops, the result of scores on a standardized conceptual survey in electricity and magnetism showed a pre-test-post-test gain of 21% in the number of correct responses. This is to be contrasted with a 5% increase for those students who did not attend workshops. Further, we present a breakdown of the final letter grades obtained by students who attended workshops versus those who did not. Since the introduction of the workshops (out of 374 students), 95% of those who attended made a ‘C’ or better in the course. This compares to only 50% of the students who did not attend workshops and making a ‘C’ or better. The workshops have been offered since the Fall of 2010, but analyzed data includes fourteen years of student letter grades from 2001 to 2014 in order to study the effects on the workshops of the D, F, or W grades (DFW rate). We report a 7% reduction of the DFW rates, which we attribute to the incorporation of the workshops. The workshops are easy to implement and relatively inexpensive, yet appear to be an effective instructional method that enhances the success of underprepared students.
Proceedings of the Urban Sustainability Assessment and Management Workshop
The U.S. Environmental Protection Agency’s Office of Research and Development’s workshop entitled, “Urban Sustainability Assessment and Management Workshop,” occurred in Chicago, Illinois on July 20 and 21, 2016. The purpose of the workshop was to examine critical challenges face...
75 FR 76018 - Third Annual Sentinel Initiative Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-07
...] Third Annual Sentinel Initiative Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION... workshop: Third Annual Sentinel Initiative Public Workshop. Hosted by the Engelberg Center for Health Care..., including an update on Mini-Sentinel and related activities, near-term plans for FDA's Sentinel Initiative...
DIAPER INDUSTRY WORKSHOP REPORT
This report is the product of a one-day workshop on the diaper industry that was sponsored by the U.S. EPA. our topics covered during the workshop were public health and safety, recycling, composting, and product life cycle analysis. he primary objective of the workshop was to id...
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2011 CFR
2011-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2010 CFR
2010-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2013 CFR
2013-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2013-07-01 2013-07-01 false Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
41 CFR 60-741.45 - Sheltered workshops.
Code of Federal Regulations, 2012 CFR
2012-07-01
... within an affirmative action program if the sheltered workshop trains employees for the contractor and... 41 Public Contracts and Property Management 1 2012-07-01 2009-07-01 true Sheltered workshops. 60... INDIVIDUALS WITH DISABILITIES Affirmative Action Program § 60-741.45 Sheltered workshops. Contracts with...
Proceedings of the Workshop on Change of Representation and Problem Reformulation
NASA Technical Reports Server (NTRS)
Lowry, Michael R.
1992-01-01
The proceedings of the third Workshop on Change of representation and Problem Reformulation is presented. In contrast to the first two workshops, this workshop was focused on analytic or knowledge-based approaches, as opposed to statistical or empirical approaches called 'constructive induction'. The organizing committee believes that there is a potential for combining analytic and inductive approaches at a future date. However, it became apparent at the previous two workshops that the communities pursuing these different approaches are currently interested in largely non-overlapping issues. The constructive induction community has been holding its own workshops, principally in conjunction with the machine learning conference. While this workshop is more focused on analytic approaches, the organizing committee has made an effort to include more application domains. We have greatly expanded from the origins in the machine learning community. Participants in this workshop come from the full spectrum of AI application domains including planning, qualitative physics, software engineering, knowledge representation, and machine learning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tranebjaerg, L.; Lubs, H.A.; Borghgraef, M.
The Seventh International Workshop on the Fragile X and X-linked Mental Retardation was held at the University of Tromso in Norway on August 2-5, 1995. Approximately 120 participants from 20 countries attended the Workshop. By special invitation Dr. Felix de la Cruz, who initiated the first international Workshop on fragile X, attended this Workshop. For the first time, the workshop took place in Scandinavia and was hosted by Lisbeth Tranebjaerg and Herbert Lubs. For most participants this Workshop, held at the northernmost university in the world, presented a unique opportunity to visit this exotic place. Between sessions, the participants hadmore » a chance to experience 24 hours of daylight, codfishing, and extreme weather situations with excessive amounts of rain as well as spectacular changes in the light and rainbows. The format of the Workshop was a combination of platform presentations and poster presentations. In contrast to previous meetings, the Workshop opened with syndromal and non-syndromal X-linked mental retardation in order to allow time for discussion. 34 refs., 1 fig.« less
2014-04-23
It has been called the world's greatest piggyback ride: a space shuttle, atop a Boeing 747 jet aircraft. But this is no ordinary 747, this is the Shuttle Carrier Aircraft...the SCA. This specially modified jumbo jet was not only a taxi service for the shuttle, but also helped in the development of the shuttle itself. In 30 years of flying, the majestic image of a spacecraft joined to the SCA, became a symbol of American invention and ingenuity.
2011-08-13
CAPE CANAVERAL, Fla. -- NASA Administrator Charlie Bolden welcomes current and former space shuttle workers and their families to the “We Made History! Shuttle Program Celebration,” Aug. 13, at the Kennedy Space Center Visitor Complex, Fla. The event was held to honor shuttle workers’ dedication to NASA’s Space Shuttle Program and to celebrate 30 years of space shuttle achievements. The event featured food, music, entertainment, astronaut appearances, educational activities, giveaways, and Starfire Night Skyshow. Photo credit: Gianni Woods
2000-10-29
The early-morning Sun provides a golden backdrop to the Space Shuttle Discovery encased in the Mate-Demate Device (MDD) at NASA’s Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used to prepare the shuttle for its ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA’s modified Boeing 747 Shuttle Carrier Aircraft.
The potential impact of the space shuttle on space benefits to mankind
NASA Technical Reports Server (NTRS)
Rattinger, I.
1972-01-01
The potential impact of the space shuttle on space benefits to mankind is discussed. The space shuttle mission profile is presented and the capabilities of the spacecraft to perform various maneuvers and operations are described. The cost effectiveness of the space shuttle operation is analyzed. The effects upon technological superiority and national economics are examined. Line drawings and artist concepts of space shuttle configurations are included to clarify the discussion.
STS-68 747 SCA Ferry Flight Takeoff for Delivery to Kennedy Space Center, Florida
NASA Technical Reports Server (NTRS)
1994-01-01
The Space Shuttle Columbia, atop NASA's 747 Shuttle Carrier Aircraft (SCA), taking off for the Kennedy Space Center shortly after its landing on 12 October 1994, at Edwards, California, to complete mission STS-68. Columbia was being ferried from the Kennedy Space Center, Florida, to Air Force Plant 42, Palmdale, California, where it will undergo six months of inspections, modifications, and systems upgrades. The STS-68 11-day mission was devoted to radar imaging of Earth's geological features with the Space Radar Laboratory. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
STS Challenger Mated to 747 SCA for Initial Delivery to Florida
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Shuttle orbiter Challenger atop NASA's Boeing 747 Shuttle Carrier Aircraft (SCA), NASA 905, after leaving the Dryden Flight Research Center, Edwards, California, for the ferry flight that took the orbiter to the Kennedy Space Center in Florida for its first launch. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
STS-35 Leaves Dryden on 747 Shuttle Carrier Aircraft (SCA) Bound for Kennedy Space Center
NASA Technical Reports Server (NTRS)
1990-01-01
The first rays of the morning sun light up the side of NASA's Boeing 747 Shuttle Carrier Aircraft (SCA) as it departs for the Kennedy Space Center, Florida, with the orbiter from STS-35 attached to its back. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
NASA Astrophysics Data System (ADS)
Macdonald, H.; Manduca, C. A.; Beane, R. J.; Doser, D. I.; Ebanks, S. C.; Hodder, J.; McDaris, J. R.; Ormand, C. J.
2017-12-01
Efforts to broaden participation in the geosciences require that faculty implement inclusive practices in their teaching and their departments. Two national projects are building the capacity for faculty and departments to implement inclusive practices. The NAGT/InTeGrate Traveling Workshops Program (TWP) and the Supporting and Advancing Geoscience Education in Two-Year Colleges (SAGE 2YC) project each prepares a cadre of geoscience educators to lead workshops that provide opportunities for faculty and departments across the country to enhance their abilities to implement inclusive teaching practices and develop inclusive environments with the goal of increasing diversity in the geosciences. Both projects prepare faculty to design and lead interactive workshops that build on the research base, emphasize practical applications and strategies, enable participants to share their knowledge and experience, and include time for reflection and action planning. The curriculum common to both projects includes a framework of support for the whole student, supporting all students, data on diversity in the geosciences, and evidence-based strategies for inclusive teaching and developing inclusive environments that faculty and departments can implement. Other workshop topics include classroom strategies for engaging all students, addressing implicit bias and stereotype threat, and attracting diverse students to departments or programs and helping them thrive. Online resources for each project provide support beyond the workshops. The TWP brings together educators from different institutional types and experiences to develop materials and design a workshop offered to departments and organizations nationwide that request the workshop; the workshop leaders then customize the workshop for that audience. In SAGE 2YC, a team of leaders used relevant literature to develop workshop materials intended for re-use, and designed a workshop session for SAGE 2YC Faculty Change Agents, who then incorporate aspects of the session in workshops they lead for their regional faculty networks. Both projects prepare faculty to lead workshops on inclusive practices and programs as a strategy to diversify the geosciences by pervasively changing the way that faculty and departments support students.
Aural rehabilitation through music workshops for cochlear implant users.
van Besouw, Rachel M; Nicholls, David R; Oliver, Benjamin R; Hodkinson, Sarah M; Grasmeder, Mary L
2014-04-01
It has been reported that after speech perception, music appreciation is the second most commonly expressed requirement among cochlear implant (CI) recipients. Certain features of music are known to be more readily accessible; however, provision of music rehabilitation for adult CI users is limited. A series of music workshops were organized to (1) enable attendees to explore which aspects of music they are able to perceive and appreciate; (2) raise awareness of listening strategies, technology, and rehabilitation resources for music; and (3) develop ideas, and prototype software, for inclusion in a music rehabilitation program. The therapeutic value of music workshops was concurrently investigated. A qualitative, longitudinal study was used. Two consultation meetings were held before a series of nine music workshops that occurred over a period of 5 mo. Five adult CI users participated in consultations before the workshops. Twenty-eight adult CI users from the South of England Cochlear Implant Centre attended at least one of the workshops. Participants could attend as many workshops as they wished. Each workshop lasted between 2 to 2.5 hr and included individual computer-based and group activities. Responses to open-ended questions were transcribed in the consultation meetings and used to develop workshop activities. A preworkshop survey was used to determine attendees' aspirations and expectations. Postworkshop surveys were used to qualitatively and quantitatively evaluate attendees' immediate reactions to the workshop content, software, and perceived benefits. A 2-month, postworkshop survey evaluated the longer-term impact of the workshops. Overall reaction to the workshops and prototype software was positive. All attendees indicated that they anticipated changing how they engaged with music as a result of the workshops, and data from the preworkshop and postworkshop surveys suggest a positive change in listening habits. The workshops proved to be an effective means of simultaneously encouraging music exploration in a social and safe environment and obtaining feedback on prototype rehabilitation materials. Survey data suggested that through group listening and practical activities, certain aspects of music can be accessible and rewarding through a CI, leading to positive changes in attitude and behavior toward music. American Academy of Audiology.
AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY AND PARKING APRON
NASA Technical Reports Server (NTRS)
1974-01-01
AERIAL OF SHUTTLE LANDING FACILITY [SLF] RUNWAY AND PARKING APRON KSC-374C-10236.23 108-KSC-374C-10236.23, P-15909, ARCHIVE-04476 Shuttle runway facility construction progress - oblique vertical, altitude 1,000 ft. Time 1100 - direction E - Shuttle Park area.
NASA Technical Reports Server (NTRS)
Henderson, Edward
2001-01-01
The Space Shuttle has been flying for over 20 years and based on the Orbiter design life of 100 missions it should be capable of flying at least 20 years more if we take care of it. The Space Shuttle Development Office established in 1997 has identified those upgrades needed to keep the Shuttle flying safely and efficiently until a new reusable launch vehicle (RLV) is available to meet the agency commitments and goals for human access to space. The upgrade requirements shown in figure 1 are to meet the program goals, support HEDS and next generation space transportation goals while protecting the country 's investment in the Space Shuttle. A major review of the shuttle hardware and processes was conducted in 1999 which identified key shuttle safety improvement priorities, as well as other system upgrades needed to reliably continue to support the shuttle miss ions well into the second decade of this century. The high priority safety upgrades selected for development and study will be addressed in this paper.
2011-04-21
CAPE CANAVERAL, Fla. -- Members of a visiting team from the Smithsonian's National Air and Space Museum examine the space shuttle's thermal protection system tile as they stand beneath shuttle Discovery in Orbiter Processing Facility-2 at NASA's Kennedy Space Center. NASA Administrator Charles Bolden announced April 12 the facilities where all four shuttle orbiters will be permanently displayed at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired in March after completing its 39th mission. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. Photo credit: NASA/Cory Huston
2011-04-12
In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. The event also commemorated the 30th anniversary of the first space shuttle launch with the launch of shuttle Columbia. Photo credit: NASA/Kim Shiflett
2011-04-21
CAPE CANAVERAL, Fla. -- Members of a visiting team from the Smithsonian's National Air and Space Museum discuss the application of the space shuttle's thermal protection system tile with shuttle technicians in Orbiter Processing Facility-2 at NASA's Kennedy Space Center. NASA Administrator Charles Bolden announced April 12 the facilities where all four shuttle orbiters will be permanently displayed at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired in March after completing its 39th mission. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. Photo credit: NASA/Cory Huston
2011-04-12
In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. The event also commemorated the 30th anniversary of the first space shuttle launch with the launch of shuttle Columbia. Photo credit: NASA/Kim Shiflett
2011-04-12
In a ceremony held in front of Orbiter Processing Facility-1 at NASA's Kennedy Space Center in Florida, NASA Administrator Charles Bolden announced the facilities where four shuttle orbiters will be displayed permanently at the conclusion of the Space Shuttle Program. Shuttle Enterprise, the first orbiter built, will move from the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia to the Intrepid Sea, Air & Space Museum in New York. The Udvar-Hazy Center will become the new home for shuttle Discovery, which retired after completing its 39th mission in March. Shuttle Endeavour, which is preparing for its final flight at the end of the month, will go to the California Science Center in Los Angeles. Atlantis, which will fly the last planned shuttle mission in June, will be displayed at the Kennedy Space Center Visitor Complex in Florida. The event also commemorated the 30th anniversary of the first space shuttle launch with the launch of shuttle Columbia. Photo credit: NASA/Kim Shiflett
CV-990 Landing Systems Research Aircraft (LSRA) during Space Shuttle tire test
1995-08-02
A NASA CV-990, modified as a Landing Systems Research Aircraft (LSRA), lands on the Edwards AFB main runway in test of the space shuttle landing gear system. In this case, the shuttle tire failed, bursting into flame during the rollout. The space shuttle landing gear test unit, operated by a high-pressure hydraulic system, allowed engineers to assess and document the performance of space shuttle main and nose landing gear systems, tires and wheel assemblies, plus braking and nose wheel steering performance. The series of 155 test missions for the space shuttle program provided extensive data about the life and endurance of the shuttle tire systems and helped raise the shuttle crosswind landing limits at Kennedy. The CV-990 used as the LSRA was built in 1962 by the Convair Division of General Dynamics Corp., Ft. Worth, Texas, served as a research aircraft at Ames Research Center, Moffett Field, California, before it came to Dryden.
2003-12-19
KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) Vice President and Space Shuttle Program Manager Howard DeCastro (left) and NASA Deputy Associate Administrator for Space Station and Shuttle Programs Michael Kostelnik (center) are briefed on the use of a cold plate in Orbiter Processing Facility Bay 2 by a USA technician (right). NASA and USA Space Shuttle program management are participating in a leadership workday. The day is intended to provide management with an in-depth, hands-on look at Shuttle processing activities at KSC.
Rendezvous and Proximity Operations of the Space Shuttle
NASA Technical Reports Server (NTRS)
Goodman, John L.
2005-01-01
Space Shuttle rendezvous missions present unique challenges that were not fully recognized when the Shuttle was designed. Rendezvous targets could be passive (i.e., no lights or transponders), and not designed to facilitate Shuttle rendezvous, proximity operations, and retrieval. Shuttle reaction control system jet plume impingement on target spacecraft presented induced dynamics, structural loading, and contamination concerns. These issues, along with limited reaction control system propellant in the Shuttle nose, drove a change from the legacy Gemini/Apollo coelliptic profile to a stable orbit profile, and the development of new proximity operations techniques. Multiple scientific and on-orbit servicing missions, and crew exchange, assembly and replenishment flights to Mir and to the International Space Station drove further profile and piloting technique changes. These changes included new proximity operations, relative navigation sensors, and new computer generated piloting cues. However, the Shuttle's baseline rendezvous navigation system has not required modification to place the Shuttle at the proximity operations initiation point for all rendezvous missions flown.
Space Shuttle Strategic Planning Status
NASA Technical Reports Server (NTRS)
Henderson, Edward M.; Norbraten, Gordon L.
2006-01-01
The Space Shuttle Program is aggressively planning the Space Shuttle manifest for assembling the International Space Station and servicing the Hubble Space Telescope. Implementing this flight manifest while concurrently transitioning to the Exploration architecture creates formidable challenges; the most notable of which is retaining critical skills within the Shuttle Program workforce. The Program must define a strategy that will allow safe and efficient fly-out of the Shuttle, while smoothly transitioning Shuttle assets (both human and facility) to support early flight demonstrations required in the development of NASA s Crew Exploration Vehicle (CEV) and Crew and Cargo Launch Vehicles (CLV). The Program must accomplish all of this while maintaining the current level of resources. Therefore, it will be necessary to initiate major changes in operations and contracting. Overcoming these challenges will be essential for NASA to fly the Shuttle safely, accomplish the President s "Vision for Space Exploration," and ultimately meet the national goal of maintaining a robust space program. This paper will address the Space Shuttle Program s strategy and its current status in meeting these challenges.
Space Shuttle Strategic Planning Status
NASA Technical Reports Server (NTRS)
Norbraten, Gordon L.; Henderson, Edward M.
2007-01-01
The Space Shuttle Program is aggressively flying the Space Shuttle manifest for assembling the International Space Station and servicing the Hubble Space Telescope. Completing this flight manifest while concurrently transitioning to the Exploration architecture creates formidable challenges; the most notable of which is retaining critical skills within the Shuttle Program workforce. The Program must define a strategy that will allow safe and efficient fly-out of the Shuttle, while smoothly transitioning Shuttle assets (both human and facility) to support early flight demonstrations required in the development of NASA's Crew Exploration Vehicle (Orion) and Crew and Cargo Launch Vehicles (Ares I). The Program must accomplish all of this while maintaining the current level of resources. Therefore, it will be necessary to initiate major changes in operations and contracting. Overcoming these challenges will be essential for NASA to fly the Shuttle safely, accomplish the Vision for Space Exploration, and ultimately meet the national goal of maintaining a robust space program. This paper will address the Space Shuttle Program s strategy and its current status in meeting these challenges.
Mars Sample Handling Protocol Workshop Series
NASA Technical Reports Server (NTRS)
Race, Margaret S. (Editor); Nealson, Kenneth H.; Rummel, John D. (Editor); Acevedo, Sara E. (Editor); Devincenzi, Donald L. (Technical Monitor)
2001-01-01
This report provides a record of the proceedings and recommendations of Workshop 3 of the Series, which was held in San Diego, California, March 19-21, 2001. Materials such as the Workshop agenda and participant lists as well as complete citations of all references and a glossary of terms and acronyms appear in the Appendices. Workshop 3 builds on the deliberations and findings of the earlier workshops in the Series, which have been reported separately. During Workshop 3, five individual sub-groups were formed to discuss the following topics: (1) Unifying Properties of Life, (2) Morphological organization and chemical properties, (3) Geochemical and geophysical properties, (4) Chemical Method and (5) Cell Biology Methods.
Proceedings of the NASA Laboratory Astrophysics Workshop
NASA Technical Reports Server (NTRS)
Salama, Farid (Editor)
2002-01-01
This document is the proceedings of the NASA Laboratory Astrophysics Workshop, convened May 1-3, 2002 at NASA's Ames Research Center. Sponsored by the NASA Office of Space Science (OSS), this programmatic workshop is held periodically by NASA to discuss the current state of knowledge in the interdisciplinary field of laboratory astrophysics and to identify the science priorities (needs) in support of NASA's space missions. An important goal of the Workshop is to provide input to OSS in the form of a white paper for incorporation in its strategic planning. This report comprises a record of the complete proceedings of the Workshop and the Laboratory Astrophysics White Paper drafted at the Workshop.
Al-Khan, A; Aye, I L; Barsoum, I; Borbely, A; Cebral, E; Cerchi, G; Clifton, V L; Collins, S; Cotechini, T; Davey, A; Flores-Martin, J; Fournier, T; Franchi, A M; Fretes, R E; Graham, C H; Godbole, G; Hansson, S R; Headley, P L; Ibarra, C; Jawerbaum, A; Kemmerling, U; Kudo, Y; Lala, P K; Lassance, L; Lewis, R M; Menkhorst, E; Morris, C; Nobuzane, T; Ramos, G; Rote, N; Saffery, R; Salafia, C; Sarr, D; Schneider, H; Sibley, C; Singh, A T; Sivasubramaniyam, T S; Soares, M J; Vaughan, O; Zamudio, S; Lash, G E
2011-03-01
Workshops are an important part of the IFPA annual meeting. At IFPA Meeting 2010 diverse topics were discussed in twelve themed workshops, six of which are summarized in this report. 1. The placental pathology workshop focused on clinical correlates of placenta accreta/percreta. 2. Mechanisms of regulation of trophoblast invasion and spiral artery remodeling were discussed in the trophoblast invasion workshop. 3. The fetal sex and intrauterine stress workshop explored recent work on placental sex differences and discussed them in the context of whether boys live dangerously in the womb.4. The workshop on parasites addressed inflammatory responses as a sign of interaction between placental tissue and parasites. 5. The decidua and embryonic/fetal loss workshop focused on key regulatory mediators in the decidua, embryo and fetus and how alterations in expression may contribute to different diseases and adverse conditions of pregnancy. 6. The trophoblast differentiation and syncytialisation workshop addressed the regulation of villous cytotrophoblast differentiation and how variations may lead to placental dysfunction and pregnancy complications. Copyright © 2011 Elsevier Ltd. All rights reserved.
Training veterinarians and agricultural advisers on a novel tool for tail biting prevention.
Vom Brocke, A L; Madey, D P; Gauly, M; Schrader, L; Dippel, S
2015-01-01
Many health and welfare problems in modern livestock production are multifactorial problems which require innovative solutions, such as novel risk assessment and management tools. However, the best way to distribute such novel - and usually complex - tools to the key applicants still has to be discussed. This paper shares experiences from distributing a novel tail biting prevention tool ('SchwIP') to 115 farm advisers and 19 veterinarians in 23 one-day workshops. Participants gave written and oral feedback at the end of the workshops, which was later analysed together with the number of farms they had visited after the workshops. Workshop groups were categorised into groups showing (a) HIGH, (b) INTermediate or (c) LOW levels of antagonism against SchwIP or parts of it during workshop discussions. Group types did not significantly differ in their evaluation of knowledge transfer. However, HIGH group members evaluated the on-farm usability of the tool significantly lower in the workshop feedback and tended to visit fewer farms. As antagonistic discussion can influence workshop output, future workshop leaders should strive for basic communication training as well as some group leadership experience before setting up and leading workshops.
Impact of the On the Cutting Edge Professional Development Program on U.S. Geoscience Faculty
NASA Astrophysics Data System (ADS)
Manduca, C. A.; Iverson, E. A.; Czujko, R.; Macdonald, H.; Mogk, D. W.; Tewksbury, B. J.; McLaughlin, J.; Sanford, C.; Greenseid, L.; Luxenberg, M.
2011-12-01
Transforming STEM education from a dominantly lecture-based format focused on facts to classrooms where students engage with the process of understanding the world through science is a primary goal of faculty development. On the Cutting Edge seeks to support this transformation by using workshops and a website to build a community of geoscience faculty who learn from one another. In order to assess the impact of the On the Cutting Edge program, we surveyed 5917 U.S. geoscience faculty in 2009 and received 2874 completed responses (49% response rate). We looked at the differences in responses between workshop participants who also use the website, website users who have not attended a Cutting Edge workshop, and survey respondents who had neither attended a Cutting Edge workshop nor used the Cutting Edge website. The number of respondents who had attended a Cutting Edge workshop and had not used the website was too small to analyze. Courses described by Cutting Edge workshop participants make significantly less use of lecture and more use of small group discussion and in-class activities. While all faculty respondents routinely update their courses, workshop participants are more likely to have changed their teaching methods in the two years leading up to the survey. When making changes to their teaching methods, workshop participants are more likely than other populations to seek information about teaching on the web, consult journal articles about teaching, and seek advice from colleagues outside their department and from nationally known leaders in geoscience education. Workshop participants are also more likely to tell a colleague when they do something that is particularly successful in class. End-of-workshop survey and follow-up interview data indicate that participants leave workshops reinvigorated, with a new or renewed commitment to student-centered teaching, and that they make use of the website as they implement ideas for changing their teaching following the workshop. Participants can identify specific ideas, techniques, and materials from workshops and the website that they have used in their teaching, and they attribute substantial improvements in their teaching to the Cutting Edge professional development experience. While the differences in behavior reported in the survey results may in part reflect the choice to attend workshops by faculty inclined to improve their teaching, the combination of motivation, attitude, and information developed through the workshop experience is amplifying this effect.
Integrating Scientists into Teacher Professional Development—Strategies for Success
NASA Astrophysics Data System (ADS)
Lynds, S. E.; Buhr, S. M.; Smith, L. K.
2010-12-01
Professional development workshops for science teachers can be greatly enhanced by scientist participation. Such workshops may promote a collegial community and mutual understanding between researchers and educators. The CIRES (Cooperative Institute for Research in Environmental Sciences) Education and Outreach (EO) group at the University of Colorado, Boulder, has over a decade of experience in successfully developing and hosting such events. Scientist participation in these workshops varies widely—from giving formal presentations to working one-on-one with educators in designing a research project. Researchers from CIRES, NOAA (National Oceanic and Atmospheric Administration), NSIDC (National Snow and Ice Data Center), and other Colorado agencies and institutions have participated in the workshops. In addition, graduate students in scientific research programs at the University of Colorado are frequently involved. Such workshops can be effective broader impacts components of scientific programs. One example of a long-running successful program was the Earthworks project (1998-2007), a one-week workshop for secondary science teachers from around the country. With the help of practicing geoscientists, participants working in teams designed and conducted a field-based interdisciplinary study. Attendees were so enthusiastic that the ongoing Listserv community (including both scientist and educators) is still active and engaged three years after the last workshop. In a more recent example, since 2009 CIRES EO has been hosting an annual week-long summer workshop as the COSEE (Centers for Ocean Science Education Excellence) West—Colorado Collaborative. The COSEE workshops have had a different theme each year. In 2010, the workshop explored the link between Arctic sea ice, the Greenland ice sheet, sea level, and global climate processes. Extensive evaluation efforts have been included in the design of each workshop and the evaluation results are used to improve subsequent workshops. To measure achievement of program goals, feedback surveys, interviews, and workshop observation are employed. Evaluation data have shown consistently throughout the years that both educators and scientists value the time spent with each other at these workshops. Scientists enjoy sharing their topic areas with motivated and energetic educators. Conversely, science teachers appreciate the opportunity to work directly with scientists and to hear about cutting-edge research being done. This paper will review the most successful strategies for including scientists in professional development workshops, from both the teachers’ and the scientists’ perspectives.
Shuttle Discovery Overflight of Edwards Enroute to Palmdale, California, Maintenance Facility
NASA Technical Reports Server (NTRS)
1995-01-01
Space Shuttle Discovery overflies the Rogers Dry Lakebed, California, on 28 September 1995, at 12:50 p.m. Pacific Daylight Time (PDT) atop NASA's 747 Shuttle Carrier Aircraft (SCA). On its way to Rockwell Aerospace's Palmdale facility for nine months of scheduled maintenance, Discovery and the 747 were completing a two-day flight from Kennedy Space Center, Florida, that began at 7:04 a.m. Eastern Standard Time on 27 September and included an overnight stop at Salt Lake City International Airport, Utah. At the conclusion of this mission, Discovery had flown 21 shuttle missions, totaling more than 142 days in orbit. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Shuttle Enterprise Mated to 747 SCA in Flight
NASA Technical Reports Server (NTRS)
1983-01-01
The Space Shuttle Enterprise, the nation's prototype space shuttle orbiter, departed NASA's Dryden Flight Research Center, Edwards, California, at 11:00 a.m., 16 May 1983, on the first leg of its trek to the Paris Air Show at Le Bourget Airport, Paris, France. Carried by the huge 747 Shuttle Carrier Aircraft (SCA), the first stop for the Enterprise was Peterson AFB, Colorado Springs, Colorado. Piloting the 747 on the Europe trip were Joe Algranti, Johnson Space Center Chief Pilot, Astronaut Dick Scobee, and NASA Dryden Chief Pilot Tom McMurtry. Flight engineers for that portion of the flight were Dryden's Ray Young and Johnson Space Center's Skip Guidry. The Enterprise, named after the spacecraft of Star Trek fame, was originally carried and launched by the 747 during the Approach and Landing Tests (ALT) at Dryden Flight Research Center. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Shuttle Columbia Mated to 747 SCA with Crew
NASA Technical Reports Server (NTRS)
1981-01-01
The crew of NASA's 747 Shuttle Carrier Aircraft (SCA), seen mated with the Space Shuttle Columbia behind them, are from viewers left: Tom McMurtry, pilot; Vic Horton, flight engineer; Fitz Fulton, command pilot; and Ray Young, flight engineer. The SCA is used to ferry the shuttle between California and the Kennedy Space Center, Florida, and other destinations where ground transportation is not practical. The NASA 747 has special support struts atop the fuselage and internal strengthening to accommodate the additional weight of the orbiters. Small vertical fins have also been added to the tips of the horizontal stabilizers for additional stability due to air turbulence on the control surfaces caused by the orbiters. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
Shuttle Enterprise Mated to 747 SCA on Ramp
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Shuttle Enterprise, the nation's prototype space shuttle orbiter, before departing NASA's Dryden Flight Research Center, Edwards, California, at 11:00 a.m., 16 May 1983, on the first leg of its trek to the Paris Air Show at Le Bourget Airport, Paris, France. Seen here atop the huge 747 Shuttle Carrier Aircraft (SCA), the first stop for the Enterprise was Peterson AFB, Colorado Springs, Colorado. Piloting the 747 on the Europe trip were Joe Algranti, Johnson Space Center Chief Pilot, Astronaut Dick Scobee, and NASA Dryden Chief Pilot Tom McMurtry. Flight engineers for that portion of the flight were Dryden's Ray Young and Johnson Space Center's Skip Guidry. The Enterprise, named after the spacecraft of Star Trek fame, was originally carried and launched by the 747 during the Approach and Landing Tests (ALT) at Dryden Flight Research Center. Space Shuttles are the main element of America's Space Transportation System and are used for space research and other space applications. The shuttles are the first vehicles capable of being launched into space and returning to Earth on a routine basis. Space Shuttles are used as orbiting laboratories in which scientists and mission specialists conduct a wide variety of scientific experiments. Crews aboard shuttles place satellites in orbit, rendezvous with satellites to carry out repair missions and return them to space, and retrieve satellites and return them to Earth for refurbishment and reuse. Space Shuttles are true aerospace vehicles. They leave Earth and its atmosphere under rocket power provided by three liquid-propellant main engines with two solid-propellant boosters attached plus an external liquid-fuel tank. After their orbital missions, they streak back through the atmosphere and land like airplanes. The returning shuttles, however, land like gliders, without power and on runways. Other rockets can place heavy payloads into orbit, but, they can only be used once. Space Shuttles are designed to be continually reused. When Space Shuttles are used to transport complete scientific laboratories into space, the laboratories remain inside the payload bay throughout the mission. They are then removed after the Space Shuttle returns to Earth and can be reused on future flights. Some of these orbital laboratories, like the Spacelab, provide facilities for several specialists to conduct experiments in such fields as medicine, astronomy, and materials manufacturing. Some types of satellites deployed by Space Shuttles include those involved in environmental and resources protection, astronomy, weather forecasting, navigation, oceanographic studies, and other scientific fields. The Space Shuttles can also launch spacecraft into orbits higher than the Shuttle's altitude limit through the use of Inertial Upper Stage (IUS) propulsion units. After release from the Space Shuttle payload bay, the IUS is ignited to carry the spacecraft into deep space. The Space Shuttles are also being used to carry elements of the International Space Station into space where they are assembled in orbit. The Space Shuttles were built by Rockwell International's Space Transportation Systems Division, Downey, California. Rockwell's Rocketdyne Division (now part of Boeing) builds the three main engines, and Thiokol, Brigham City, Utah, makes the solid rocket booster motors. Martin Marietta Corporation (now Lockheed Martin), New Orleans, Louisiana, makes the external tanks. Each orbiter (Space Shuttle) is 121 feet long, has a wingspan of 78 feet, and a height of 57 feet. The Space Shuttle is approximately the size of a DC-9 commercial airliner and can carry a payload of 65,000 pounds into orbit. The payload bay is 60 feet long and 15 feet in diameter. Each main engine is capable of producing a sea level thrust of 375,000 pounds and a vacuum (orbital) thrust of 470,000 pounds. The engines burn a mixture of liquid oxygen and liquid hydrogen. In orbit, the Space Shuttles circle the earth at a speed of 17,500 miles per hour with each orbit taking about 90 minutes. A Space Shuttle crew sees a sunrise or sunset every 45 minutes. When Space Shuttle flights began in April 1981, Dryden Flight Research Center, Edwards, California, was the primary landing site for the Shuttles. Now Kennedy Space Center, Florida, is the primary landing site with Dryden remaining as the principal alternate landing site.
75 FR 64258 - Cloud Computing Forum & Workshop II
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-19
... DEPARTMENT OF COMMERCE National Institute of Standards and Technology Cloud Computing Forum... workshop. SUMMARY: NIST announces the Cloud Computing Forum & Workshop II to be held on November 4 and 5, 2010. This workshop will provide information on a Cloud Computing Roadmap Strategy as well as provide...
78 FR 32010 - Pipeline Safety: Public Workshop on Integrity Verification Process
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-28
.... PHMSA-2013-0119] Pipeline Safety: Public Workshop on Integrity Verification Process AGENCY: Pipeline and... announcing a public workshop to be held on the concept of ``Integrity Verification Process.'' The Integrity Verification Process shares similar characteristics with fitness for service processes. At this workshop, the...
Selling to Industry for Sheltered Workshops.
ERIC Educational Resources Information Center
Rehabilitation Services Administration (DHEW), Washington, DC.
Intended for staffs of sheltered workshops for handicapped individuals, the guide presents a plan for selling the workshop idea to industry, hints on meeting obstacles, and ideas for expanding and upgrading workshop contract promotion. Brief sections cover the following topics (example subtopics are in parentheses): finding work contract prospects…
75 FR 57804 - Safe Use Initiative; Public Workshop; Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
...] Safe Use Initiative; Public Workshop; Request for Comments AGENCY: Food and Drug Administration, HHS...) is announcing a public workshop entitled ``Safe Use Initiative.'' This public workshop, organized and hosted by FDA's Safe Use Initiative Team, will communicate the status of ongoing activities and the...
77 FR 43601 - Risks and Benefits of Hydroxyethyl Starch Solutions; Public Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
...] Risks and Benefits of Hydroxyethyl Starch Solutions; Public Workshop AGENCY: Food and Drug... public workshop entitled: ``Risks and Benefits of Hydroxyethyl Starch Solutions.'' The purpose of this... starch (HES) solutions. The public workshop has been planned in partnership with the Department of...
Federal Register 2010, 2011, 2012, 2013, 2014
2015-08-03
...] Promoting Semantic Interoperability of Laboratory Data; Public Workshop; Request for Comments AGENCY: Food... workshop entitled ``FDA/CDC/NLM Workshop on Promoting Semantic Interoperability of Laboratory Data.'' The... to promoting the semantic interoperability of laboratory data between in vitro diagnostic devices and...
Special Characteristics of the Rust Workshop and Their Influence on My Facilitation Process.
ERIC Educational Resources Information Center
Bowen, Maria Villas-Boas
1987-01-01
Evaluates the Carl Rogers Peace Project workshop held in Austria in 1985. Defines ways in which the workshop was unique. Elaborates on staff participation and the author's personal reactions. Concludes by discussing the distinctive role facilitators had in this workshop. (BR)
NASA Astrophysics Data System (ADS)
Macdonald, H.; Manduca, C. A.; Mogk, D. W.; Tewksbury, B. J.; Iverson, E. A.; Kirk, K. B.; Beane, R. J.; McConnell, D.; Wiese, K.; Wysession, M. E.
2011-12-01
On the Cutting Edge, a comprehensive, discipline-wide professional development program for current and future geoscience faculty, aims to develop a geoscience professoriate committed to high-quality instruction based on currency in scientific knowledge, good pedagogic practice, and research on learning. Our program provides an integrated workshop series and online teaching resources. Since 2002, we have offered more than 80 face-to-face workshops, virtual workshops and webinars, and hybrid events. Participants come from two-year colleges and four-year colleges and universities. The workshop series is designed to address the needs of faculty in all career stages at the full spectrum of institutions and covering the breadth of the geoscience curriculum. We select timely and compelling topics and create opportunities of interest to faculty. We offer workshops on course design, new geoscience research and pedagogical topics, core geoscience curriculum topics, and introductory courses as well as workshops for early career faculty and for future faculty. Our workshops are designed to model good teaching practice. We set workshop goals that guide workshop planning and evaluation. Workshops are interactive, emphasize participant learning, provide opportunities for participants to interact and share experience/knowledge, provide good resources, give participants time to reflect and to develop action plans, and help transform their ideas about teaching. We emphasize the importance of adaptation in the context of their specific situations. For virtual workshops and webinars we use icebreakers and other structured interactions to build a comfortable workshop community; promote interaction through features on webinar software, chat-aided question and answer, small-group synchronous interactions, and/or discussion boards; plan detailed schedules for workshop events; use asynchronous discussions and recordings of synchronous events given that participants are busy with their daily commitments; and provide sufficient technical support for participants and leaders. The importance of making the workshop useful and immediately applicable does not diminish with virtual events. One key lesson is the need to be purposeful with virtual communication strategies; the discussion boards, chat-aided discussion, and small group interactions need a specific focus, purpose, or product. Both face-to-face and virtual workshops that appear to flow spontaneously reflect extensive planning, a clear understanding of the program and its objectives by everyone involved, and realistic estimates for how long activities will really take. The workshop content and structures that we have developed result in high rates of satisfaction by participants.
Space Shuttle orbiter modifications to support Space Station Freedom
NASA Technical Reports Server (NTRS)
Segert, Randall; Lichtenfels, Allyson
1992-01-01
The Space Shuttle will be the primary vehicle to support the launch, assembly, and maintenance of the Space Station Freedom (SSF). In order to accommodate this function, the Space Shuttle orbiter will require significant modifications. These modifications are currently in development in the Space Shuttle Program. The requirements for the planned modifications to the Space Shuttle orbiter are dependent on the design of the SSF. Therefore, extensive coordination is required with the Space Station Freedom Program (SSFP) in order to identify requirements and resolve integration issues. This paper describes the modifications to the Space Shuttle orbiter required to support SSF assembly and operations.
Economics in ground operations of the Space Shuttle
NASA Technical Reports Server (NTRS)
Gray, R. H.
1973-01-01
The physical configuration, task versatility, and typical mission profile of the Space Shuttle are illustrated and described, and a comparison of shuttle and expendable rocket costs is discussed, with special emphasis upon savings to be achieved in ground operations. A review of economies achieved by engineering design improvements covers the automated checkout by onboard shuttle systems, the automated launch processing system, the new maintenance concept, and the analogy of Space Shuttle and airline repetitive operations. The Space Shuttle is shown to represent a new level in space flight technology, particularly, the sophistication of the systems and procedures devised for its support and ground operations.