The role of simulation in the development and flight test of the HiMAT vehicle
NASA Technical Reports Server (NTRS)
Evans, M. B.; Schilling, L. J.
1984-01-01
Real time simulations have been essential in the flight test program of the highly maneuverable aircraft technology (HiMAT) remotely piloted research vehicle at NASA Ames Research Center's Dryden Flight Research Facility. The HiMAT project makes extensive use of simulations in design, development, and qualification for flight, pilot training, and flight planning. Four distinct simulations, each with varying amounts of hardware in the loop, were developed for the HiMAT project. The use of simulations in detecting anomalous behavior of the flight software and hardware at the various stages of development, verification, and validation has been the key to flight qualification of the HiMAT vehicle.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 3 2012-10-01 2012-10-01 false Effect of revocation of qualification on inclusion... inclusion in employee's health benefit plans. When an HMO's qualification is revoked under § 417.163(d), the following rules apply: (a) The HMO may not seek inclusion in employees health benefits plans under subpart E...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 3 2014-10-01 2014-10-01 false Effect of revocation of qualification on inclusion... inclusion in employee's health benefit plans. When an HMO's qualification is revoked under § 417.163(d), the following rules apply: (a) The HMO may not seek inclusion in employees health benefits plans under subpart E...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 3 2013-10-01 2013-10-01 false Effect of revocation of qualification on inclusion... inclusion in employee's health benefit plans. When an HMO's qualification is revoked under § 417.163(d), the following rules apply: (a) The HMO may not seek inclusion in employees health benefits plans under subpart E...
WTP Waste Feed Qualification: Glass Fabrication Unit Operation Testing Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, M. E.; Newell, J. D.; Johnson, F. C.
The waste feed qualification program is being developed to protect the Hanford Tank Waste Treatment and Immobilization Plant (WTP) design, safety basis, and technical basis by assuring waste acceptance requirements are met for each staged waste feed campaign prior to transfer from the Tank Operations Contractor to the feed receipt vessels inside the Pretreatment Facility. The Waste Feed Qualification Program Plan describes the three components of waste feed qualification: 1. Demonstrate compliance with the waste acceptance criteria 2. Determine waste processability 3. Test unit operations at laboratory scale. The glass fabrication unit operation is the final step in the processmore » demonstration portion of the waste feed qualification process. This unit operation generally consists of combining each of the waste feed streams (high-level waste (HLW) and low-activity waste (LAW)) with Glass Forming Chemicals (GFCs), fabricating glass coupons, performing chemical composition analysis before and after glass fabrication, measuring hydrogen generation rate either before or after glass former addition, measuring rheological properties before and after glass former addition, and visual observation of the resulting glass coupons. Critical aspects of this unit operation are mixing and sampling of the waste and melter feeds to ensure representative samples are obtained as well as ensuring the fabrication process for the glass coupon is adequate. Testing was performed using a range of simulants (LAW and HLW simulants), and these simulants were mixed with high and low bounding amounts of GFCs to evaluate the mixing, sampling, and glass preparation steps in shielded cells using laboratory techniques. The tests were performed with off-the-shelf equipment at the Savannah River National Laboratory (SRNL) that is similar to equipment used in the SRNL work during qualification of waste feed for the Defense Waste Processing Facility (DWPF) and other waste treatment facilities at the Savannah River Site. It is not expected that the exact equipment used during this testing will be used during the waste feed qualification testing for WTP, but functionally similar equipment will be used such that the techniques demonstrated would be applicable. For example, the mixing apparatus could use any suitable mixer capable of being remoted and achieving similar mixing speeds to those tested.« less
The Representative Shuttle Environmental Control System
NASA Technical Reports Server (NTRS)
Brose, H. F.; Greenwood, F. H.; Thompson, C. D.; Willis, N. C.
1974-01-01
The Representative Shuttle Environmental Control System (RSECS) program was conceived to provide NASA with a prototype system representative of the Shuttle Environmental Control System (ECS). Discussed are the RSECS program objectives, predicated on updating and adding to the early system as required to retain its usefulness during the Shuttle ECS development and qualification effort. Ultimately, RSECS will be replaced with a flight-designed system using either refurbished development or qualification equipment to provide NASA with a flight simulation capability during the Shuttle missions. The RSECS air revitalization subsystem and the waste management support subsystem are being tested. A water coolant subsystem and a freon coolant subsystem are in the development and planning phases.
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2012 CFR
2012-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2013 CFR
2013-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2014 CFR
2014-01-01
... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...
Training System Device Certification and Qualification Process
2013-09-01
Engineering IPT Integrated Product Team ISD Instructional Systems Development ISEO In-Service Engineering Office KSAs Knowledge, Skills, and Attributes...Plan TES Tactical Engagement Simulation TPM Training Pipeline Managers T&R Training and Readiness TRR Test Readiness Review TS Training System...NAWCTSD) is the Navy’s source for a full range of innovative products and services that provide complete training solutions. This includes
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Effect of revocation of qualification on inclusion... Qualified Health Maintenance Organizations § 417.164 Effect of revocation of qualification on inclusion in... rules apply: (a) The HMO may not seek inclusion in employees health benefits plans under subpart E of...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 3 2011-10-01 2011-10-01 false Effect of revocation of qualification on inclusion... Qualified Health Maintenance Organizations § 417.164 Effect of revocation of qualification on inclusion in... rules apply: (a) The HMO may not seek inclusion in employees health benefits plans under subpart E of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualification Performance Standards for Helicopter Full Flight Simulators C Appendix C to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App....
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Qualification Performance Standards for Helicopter Full Flight Simulators C Appendix C to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App....
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Qualification Performance Standards for Helicopter Full Flight Simulators C Appendix C to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App....
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Qualification Performance Standards for Helicopter Full Flight Simulators C Appendix C to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App....
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualification Performance Standards for Helicopter Full Flight Simulators C Appendix C to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App....
2012-03-01
on the standard Navy Handgun Qualification Course. Results partially supported the hypotheses. The simulation group showed greater improvement in MPI...standard Navy Handgun Qualification Course. Results partially supported the hypotheses. The simulation group showed greater improvement in MPI than the...14 3. Navy Handgun Qualification Course Firing Sequence ..................15 F. PROCEDURES
14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...
14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...
SLUDGE BATCH 7B QUALIFICATION ACTIVITIES WITH SRS TANK FARM SLUDGE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pareizs, J.; Click, D.; Lambert, D.
2011-11-16
Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry - Sludge Batch 7b (SB7b) - be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from Hmore » Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL typically simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). With the tight schedule constraints for SB7b and the potential need for caustic addition to allow for an acceptable glass processing window, the qualification for SB7b was approached differently than past batches. For SB7b, SRNL prepared a Tank 51 and a Tank 40 sample for qualification. SRNL did not receive the qualification sample from Tank 51 nor did it simulate all of the Tank Farm washing and decanting operations. Instead, SRNL prepared a Tank 51 SB7b sample from samples of Tank 7 and Tank 51, along with a wash solution to adjust the supernatant composition to the final SB7b Tank 51 Tank Farm projections. SRNL then prepared a sample to represent SB7b in Tank 40 by combining portions of the SRNL-prepared Tank 51 SB7b sample and a Tank 40 Sludge Batch 7a (SB7a) sample. The blended sample was 71% Tank 40 (SB7a) and 29% Tank 7/Tank 51 on an insoluble solids basis. This sample is referred to as the SB7b Qualification Sample. The blend represented the highest projected Tank 40 heel (as of May 25, 2011), and thus, the highest projected noble metals content for SB7b. Characterization was performed on the Tank 51 SB7b samples and SRNL performed DWPF simulations using the Tank 40 SB7b material. This report documents: (1) The preparation and characterization of the Tank 51 SB7b and Tank 40 SB7b samples. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the SB7b Tank 40 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a nonradioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the SRAT receipt, SRAT product, and SME product. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7b related data together in a single permanent record and to discuss the overall aspects of SB7b processing.« less
Staubli TX-90XL robot qualification at the LLIHE.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Covert, Timothy Todd
The Light Initiated High Explosive (LIHE) Facility uses a robotic arm to spray explosive material onto test items for impulse tests. In 2007, the decision was made to replace the existing PUMA 760 robot with the Staubli TX-90XL. A qualification plan was developed and implemented to verify the safe operating conditions and failure modes of the new system. The robot satisfied the safety requirements established in the qualification plan. A performance issue described in this report remains unresolved at the time of this publication. The final readiness review concluded the qualification of this robot at the LIHE facility.
2013-01-01
proposed acquisition of a variety of armoured vehicle simulators for training within the Canadian Forces. The Directorate of Land Requirements (DLR... armoured vehicle operations under the Land Vehicle Crew Training System (LVCTS) project. DLR has published a Letter of Interest (LOI) to solicit input...LVCTS project staff to discuss the intent of the project. Qualification Standards and Training Plans for several military armoured vehicle
14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). Link to an amendment... airman (airplane) is a person who is qualified, and permitted, to conduct flight checks or instruction in...
14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...
14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...
14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...
14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...
14 CFR 91.1091 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2011 CFR
2011-01-01
... (aircraft) and flight instructors (simulator). 91.1091 Section 91.1091 Aeronautics and Space FEDERAL... Qualifications: Flight instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this... aircraft, in a flight simulator, or in a flight training device for a particular type, class, or category...
14 CFR 91.1091 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2012 CFR
2012-01-01
... (aircraft) and flight instructors (simulator). 91.1091 Section 91.1091 Aeronautics and Space FEDERAL... Qualifications: Flight instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this... aircraft, in a flight simulator, or in a flight training device for a particular type, class, or category...
14 CFR 91.1091 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2013 CFR
2013-01-01
... (aircraft) and flight instructors (simulator). 91.1091 Section 91.1091 Aeronautics and Space FEDERAL... Qualifications: Flight instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this... aircraft, in a flight simulator, or in a flight training device for a particular type, class, or category...
14 CFR 91.1091 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2014 CFR
2014-01-01
... (aircraft) and flight instructors (simulator). 91.1091 Section 91.1091 Aeronautics and Space FEDERAL... Qualifications: Flight instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this... aircraft, in a flight simulator, or in a flight training device for a particular type, class, or category...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Quality Management Systems for Flight Simulation Training Devices E Appendix E to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION...—Qualification Performance Standards for Quality Management Systems for Flight Simulation Training Devices Begin...
5 CFR 330.709 - Qualification reviews.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualification reviews. 330.709 Section..., SELECTION, AND PLACEMENT (GENERAL) Interagency Career Transition Assistance Plan for Displaced Employees § 330.709 Qualification reviews. Agencies will ensure that a documented, independent second review is...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pareizs, J.; Billings, A.; Click, D.
2011-07-08
Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are oftenmore » added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non-radioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7a related data together in a single permanent record and to discuss the overall aspects of SB7a processing.« less
5 CFR 330.609 - Qualification reviews.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Qualification reviews. 330.609 Section..., SELECTION, AND PLACEMENT (GENERAL) Agency Career Transition Assistance Plans (CTAP) for Local Surplus and Displaced Employees § 330.609 Qualification reviews. Agencies will ensure that a documented, independent...
NASA Technical Reports Server (NTRS)
Flemming, Robert J.; Britton, Randall K.; Bond, Thomas H.
1994-01-01
The cost and time to certify or qualify a rotorcraft for flight in forecast icing has been a major impediment to the development of ice protection systems for helicopter rotors. Development and flight test programs for those aircraft that have achieved certification or qualification for flight in icing conditions have taken many years, and the costs have been very high. NASA, Sikorsky, and others have been conducting research into alternative means for providing information for the development of ice protection systems, and subsequent flight testing to substantiate the air-worthiness of a rotor ice protection system. Model rotor icing tests conducted in 1989 and 1993 have provided a data base for correlation of codes, and for the validation of wind tunnel icing test techniques. This paper summarizes this research, showing test and correlation trends as functions of cloud liquid water content, rotor lift, flight speed, and ambient temperature. Molds were made of several of the ice formations on the rotor blades. These molds were used to form simulated ice on the rotor blades, and the blades were then tested in a wind tunnel to determine flight performance characteristics. These simulated-ice rotor performance tests are discussed in the paper. The levels of correlation achieved and the role of these tools (codes and wind tunnel tests) in flight test planning, testing, and extension of flight data to the limits of the icing envelope are discussed. The potential application of simulated ice, the NASA LEWICE computer, the Sikorsky Generalized Rotor Performance aerodynamic computer code, and NASA Icing Research Tunnel rotor tests in a rotorcraft certification or qualification program are also discussed. The correlation of these computer codes with tunnel test data is presented, and a procedure or process to use these methods as part of a certification or qualification program is introduced.
14 CFR 121.412 - Qualifications: Flight instructors (airplane) and flight instructors (simulator).
Code of Federal Regulations, 2012 CFR
2012-01-01
... (airplane) and flight instructors (simulator). 121.412 Section 121.412 Aeronautics and Space FEDERAL... OPERATIONS Training Program § 121.412 Qualifications: Flight instructors (airplane) and flight instructors (simulator). (a) For the purposes of this section and § 121.414: (1) A flight instructor (airplane) is a...
14 CFR 121.412 - Qualifications: Flight instructors (airplane) and flight instructors (simulator).
Code of Federal Regulations, 2013 CFR
2013-01-01
... (airplane) and flight instructors (simulator). 121.412 Section 121.412 Aeronautics and Space FEDERAL... OPERATIONS Training Program § 121.412 Qualifications: Flight instructors (airplane) and flight instructors (simulator). (a) For the purposes of this section and § 121.414: (1) A flight instructor (airplane) is a...
14 CFR 121.412 - Qualifications: Flight instructors (airplane) and flight instructors (simulator).
Code of Federal Regulations, 2011 CFR
2011-01-01
... (airplane) and flight instructors (simulator). 121.412 Section 121.412 Aeronautics and Space FEDERAL... OPERATIONS Training Program § 121.412 Qualifications: Flight instructors (airplane) and flight instructors (simulator). (a) For the purposes of this section and § 121.414: (1) A flight instructor (airplane) is a...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-10
... qualification process as an important tool for the assessment of vehicle performance. These simulations are... qualification process, simulations would be conducted using both a measured track geometry segment... on the results of simulation studies designed to identify track geometry irregularities associated...
14 CFR 121.412 - Qualifications: Flight instructors (airplane) and flight instructors (simulator).
Code of Federal Regulations, 2010 CFR
2010-01-01
... (airplane) and flight instructors (simulator). 121.412 Section 121.412 Aeronautics and Space FEDERAL... OPERATIONS Training Program § 121.412 Qualifications: Flight instructors (airplane) and flight instructors (simulator). (a) For the purposes of this section and § 121.414: (1) A flight instructor (airplane) is a...
14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.29 - Other losses of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Other losses of qualification and procedures for restoration of qualification. 60.29 Section 60.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.27 - Automatic loss of qualification and procedures for restoration of qualification.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Automatic loss of qualification and procedures for restoration of qualification. 60.27 Section 60.27 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
Implementation plans for the Korean certified tumor registrar qualification system.
Boo, Yoo-Kyung; Lim, Hyun-Sook; Won, Young-Joo
2014-01-01
Cancer registration data is used to understand the nation's cancer burden, and to provide significant baseline data for cancer control efforts, as well as, research on cancer incidence, mortality, survival, and prevalence. A system that approves, assesses, and manages the qualification of specialists, responsible for performing cancer registration, has not been developed in Korea. This study presents ways to implement a certification system designed for the qualification of tumor registrars in Korea. Requirements for implementing a certified tumor registrar qualification system were determined by reviewing the system for establishing qualifications in Korea and the American qualification system via the National Cancer Registrars Association (NCRA). Moreover, a survey was conducted on Korean medical records administrators, who had taken the U.S. Certified Tumor Registrar (CTR) examination, in order to review their opinions regarding these requirements. This study verified the feasibility of a qualification examination based on the opinions of CTR specialists by determining the following: items, and the associated ratings, of the qualifications necessary to register individuals as certified tumor registrars in a private qualification system; status of human resources required for the examination or training processes; plans regarding the organization needed for management, and operation of qualifications, examination standards, subject areas, examination methods, examination qualifications, or education and training programs. The implementation of a certified tumor registrar qualification system will lead to enhanced job competency for specialists and a qualitative improvement of cancer registration data. It will also reliably foster human resources that will lay the groundwork needed to establish scientific and reasonable national cancer management policies.
Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle
NASA Technical Reports Server (NTRS)
Cockrell, Charles
2008-01-01
NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.
WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, M. E.; Newell, J. D.; Smith, T. E.
The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combinedmore » 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These simulants were tested at different temperatures using purge gas spiked with varying amounts of hydrogen to provide verification that the system could accurately measure the hydrogen in the vent gas at steady state.« less
Engineering and erection of a 300kW high-flux solar simulator
NASA Astrophysics Data System (ADS)
Wieghardt, Kai; Laaber, Dmitrij; Hilger, Patrick; Dohmen, Volkmar; Funken, Karl-Heinz; Hoffschmidt, Bernhard
2017-06-01
German Aerospace Center (DLR) is currently constructing a new high-flux solar simulator synlight which shall be commissioned in late 2016. The new facility will provide three separately operated experimental spaces with expected radiant powers of about 300kW / 240kW / 240kW respectively. synlight was presented to the public for the first time at SolarPACES 2015 [1]. Its engineering and erection is running according to plan. The current presentation reports about the engineering and the ongoing erection of the novel facility, and gives an outlook on its new level of possibilities for solar testing and qualification.
Transfer of training and simulator qualification or myth and folklore in helicopter simulation
NASA Technical Reports Server (NTRS)
Dohme, Jack
1992-01-01
Transfer of training studies at Fort Rucker using the backward-transfer paradigm have shown that existing flight simulators are not entirely adequate for meeting training requirements. Using an ab initio training research simulator, a simulation of the UH-1, training effectiveness ratios were developed. The data demonstrate it to be a cost-effective primary trainer. A simulator qualification method was suggested in which a combination of these transfer-of-training paradigms is used to determine overall simulator fidelity and training effectiveness.
DFL, Canada's Space AIT Facilities - Current and Planned Capabilities
NASA Astrophysics Data System (ADS)
Singhal, R.; Mishra, S.; Choueiry, E.; Dumoulin, J.; Ahmed, S.
2004-08-01
The David Florida Laboratory (DFL) of the Canadian Space Agency is the Canadian national ISO 9001:2000 registered facility for the assembly, integration, and (environmental) testing of space hardware. This paper briefly describes the three main qualification facilities: Structural Qualification Facilities (SQF); Radio Frequency Qualification Facilities (RFQF); and Thermal Qualification Facilities (TQF). The paper also describes the planned/new upgrades/improvements to the DFL's existing capabilities. These include: cylindrical near-field antenna measurement system, current capabilities in multi-frequency multi-band passive intermodulation (PIM) measurement; combined thermal/vibration test facility, improvement in efficiency and performance of the photogrammetry capability, acquisition of an additional mass properties measurement system for small and micro-satellites; combined control and data acquisition system for all existing thermal vacuum facilities, plus a new automatic thermal control system and hypobaric chamber.
Simulator Sickness in the AH-1S (Cobra) Flight Simulator
1989-09-01
ADJUSTABLE ARMAMENT BOMB LUG (upper rack use only) AFT ATTACHING POINT SWAY GRACE PAD HANS DEBRIS DIRECTOR ~~ CAPTIVE LOCKINGPI FORWARDHARNESS...Qualification training) Training Stage : Qualification Continuation Refresher AAPART (Check Ride) Mission All rights reserved Essex Corporation 1040 Woodcock Road
14 CFR 60.15 - Initial qualification requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...
14 CFR 60.15 - Initial qualification requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...
14 CFR 60.7 - Sponsor qualification requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...
14 CFR 60.7 - Sponsor qualification requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...
14 CFR 60.7 - Sponsor qualification requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...
14 CFR 60.15 - Initial qualification requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...
14 CFR 60.7 - Sponsor qualification requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Sponsor qualification requirements. 60.7 Section 60.7 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.7...
14 CFR 60.15 - Initial qualification requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...
14 CFR 60.4 - Qualification Performance Standards.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...
14 CFR 60.4 - Qualification Performance Standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...
14 CFR 60.15 - Initial qualification requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Initial qualification requirements. 60.15 Section 60.15 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.15...
14 CFR 60.4 - Qualification Performance Standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...
14 CFR 60.4 - Qualification Performance Standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...
14 CFR 60.4 - Qualification Performance Standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualification Performance Standards. 60.4 Section 60.4 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.4...
40 CFR 62.14605 - How do I obtain my operator qualification?
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Operator Training and Qualification § 62.14605 How do...
14 CFR 121.412 - Qualifications: Flight instructors (airplane) and flight instructors (simulator).
Code of Federal Regulations, 2014 CFR
2014-01-01
... (airplane) and flight instructors (simulator). 121.412 Section 121.412 Aeronautics and Space FEDERAL... OPERATIONS Training Program § 121.412 Qualifications: Flight instructors (airplane) and flight instructors... section and § 121.414: (1) A flight instructor (airplane) is a person who is qualified to instruct in an...
40 CFR 62.14615 - How do I renew my lapsed operator qualification?
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Operator Training and Qualification § 62.14615 How do...
14 CFR 60.16 - Additional qualifications for a currently qualified FSTD.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Additional qualifications for a currently qualified FSTD. 60.16 Section 60.16 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE...
14 CFR 60.16 - Additional qualifications for a currently qualified FSTD.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Additional qualifications for a currently qualified FSTD. 60.16 Section 60.16 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE...
14 CFR 60.16 - Additional qualifications for a currently qualified FSTD.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Additional qualifications for a currently qualified FSTD. 60.16 Section 60.16 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE...
14 CFR 60.16 - Additional qualifications for a currently qualified FSTD.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Additional qualifications for a currently qualified FSTD. 60.16 Section 60.16 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE...
14 CFR 60.16 - Additional qualifications for a currently qualified FSTD.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE... required to undergo an additional qualification process if a user intends to use the FSTD for meeting... that FSTD. This process consists of the following: (1) The sponsor: (i) Must submit to the NSPM all...
Sensor Data Qualification Technique Applied to Gas Turbine Engines
NASA Technical Reports Server (NTRS)
Csank, Jeffrey T.; Simon, Donald L.
2013-01-01
This paper applies a previously developed sensor data qualification technique to a commercial aircraft engine simulation known as the Commercial Modular Aero-Propulsion System Simulation 40,000 (C-MAPSS40k). The sensor data qualification technique is designed to detect, isolate, and accommodate faulty sensor measurements. It features sensor networks, which group various sensors together and relies on an empirically derived analytical model to relate the sensor measurements. Relationships between all member sensors of the network are analyzed to detect and isolate any faulty sensor within the network.
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. H. Titus, S. Avasaralla, A.Brooks, R. Hatcher
2010-09-22
The National Spherical Torus Experiment (NSTX) project is planning upgrades to the toroidal field, plasma current and pulse length. This involves the replacement of the center-stack, including the inner legs of the TF, OH, and inner PF coils. A second neutral beam will also be added. The increased performance of the upgrade requires qualification of the remaining components including the vessel, passive plates, and divertor for higher disruption loads. The hardware needing qualification is more complex than is typically accessible by large scale electromagnetic (EM) simulations of the plasma disruptions. The usual method is to include simplified representations of componentsmore » in the large EM models and attempt to extract forces to apply to more detailed models. This paper describes a more efficient approach of combining comprehensive modeling of the plasma and tokamak conducting structures, using the 2D OPERA code, with much more detailed treatment of individual components using ANSYS electromagnetic (EM) and mechanical analysis. This capture local eddy currents and resulting loads in complex details, and allows efficient non-linear, and dynamic structural analyses.« less
14 CFR 61.4 - Qualification and approval of flight simulators and flight training devices.
Code of Federal Regulations, 2010 CFR
2010-01-01
... for certain flight training devices. (b) Any device used for flight training, testing, or checking... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualification and approval of flight simulators and flight training devices. 61.4 Section 61.4 Aeronautics and Space FEDERAL AVIATION...
14 CFR 61.4 - Qualification and approval of flight simulators and flight training devices.
Code of Federal Regulations, 2013 CFR
2013-01-01
... for certain flight training devices. (b) Any device used for flight training, testing, or checking... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Qualification and approval of flight simulators and flight training devices. 61.4 Section 61.4 Aeronautics and Space FEDERAL AVIATION...
14 CFR 61.4 - Qualification and approval of flight simulators and flight training devices.
Code of Federal Regulations, 2012 CFR
2012-01-01
... for certain flight training devices. (b) Any device used for flight training, testing, or checking... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Qualification and approval of flight simulators and flight training devices. 61.4 Section 61.4 Aeronautics and Space FEDERAL AVIATION...
14 CFR 61.4 - Qualification and approval of flight simulators and flight training devices.
Code of Federal Regulations, 2014 CFR
2014-01-01
... for certain flight training devices. (b) Any device used for flight training, testing, or checking... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Qualification and approval of flight simulators and flight training devices. 61.4 Section 61.4 Aeronautics and Space FEDERAL AVIATION...
14 CFR 61.4 - Qualification and approval of flight simulators and flight training devices.
Code of Federal Regulations, 2011 CFR
2011-01-01
... for certain flight training devices. (b) Any device used for flight training, testing, or checking... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualification and approval of flight simulators and flight training devices. 61.4 Section 61.4 Aeronautics and Space FEDERAL AVIATION...
Qualification and Lessons Learned with Space Flight Fiber Optic Components
NASA Technical Reports Server (NTRS)
Ott, Melanie
2007-01-01
This presentation covers lessons learned during the design, development, manufacturing and qualification of space flight fiber optic components. Changes at NASA, including short-term projects and decreased budgets have brought about changes to vendors and parts. Most photonics for NASA needs are now commercial off the shelf (COTS) products. The COTS Tecnology Assurance approach for space flight and qualification plans are outlined.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Policy. 609.202 Section 609.202 Federal Acquisition Regulations System DEPARTMENT OF STATE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Qualifications Requirements 609.202 Policy. The authority prescribed in...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 9.202 Section 9.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Qualifications Requirements 9.202 Policy. (a)(1) The head of the agency or designee...
14 CFR 121.913 - Qualification curriculum.
Code of Federal Regulations, 2014 CFR
2014-01-01
... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Advanced Qualification Program § 121.913... planned hours of training, evaluation, and supervised operating experience. (b) For crewmembers, aircraft... activities that are aircraft- and equipment-specific to qualify a person for a particular duty position on...
14 CFR 121.913 - Qualification curriculum.
Code of Federal Regulations, 2013 CFR
2013-01-01
... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Advanced Qualification Program § 121.913... planned hours of training, evaluation, and supervised operating experience. (b) For crewmembers, aircraft... activities that are aircraft- and equipment-specific to qualify a person for a particular duty position on...
14 CFR 121.913 - Qualification curriculum.
Code of Federal Regulations, 2012 CFR
2012-01-01
... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Advanced Qualification Program § 121.913... planned hours of training, evaluation, and supervised operating experience. (b) For crewmembers, aircraft... activities that are aircraft- and equipment-specific to qualify a person for a particular duty position on...
Code of Federal Regulations, 2010 CFR
2010-01-01
.... Qualification Performance Standards (§ 60.4). 5. Quality Management System (§ 60.5). 6. Sponsor Qualification... inquiries on system compatibility, and minimum system requirements are also included on the NSP Web site. d... Flight Guidance Systems. (15) AC 120-57, as amended, Surface Movement Guidance and Control System (SMGCS...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualification Performance Standards for Helicopter Flight Training Devices D Appendix D to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Qualification Performance Standards for Helicopter Flight Training Devices D Appendix D to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Qualification Performance Standards for Helicopter Flight Training Devices D Appendix D to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualification Performance Standards for Helicopter Flight Training Devices D Appendix D to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Qualification Performance Standards for Helicopter Flight Training Devices D Appendix D to Part 60 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE Pt. 60, App...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-03
... requirements similar to those previously imposed by Commission orders issued after the terrorist attacks of... Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Cyber Security Plan...
NASA Technical Reports Server (NTRS)
Glover, R. D.
1983-01-01
The NASA Dryden Flight Research Facility has developed a microprocessor-based, user-programmable, general-purpose aircraft interrogation and display system (AIDS). The hardware and software of this ground-support equipment have been designed to permit diverse applications in support of aircraft digital flight-control systems and simulation facilities. AIDS is often employed to provide engineering-units display of internal digital system parameters during development and qualification testing. Such visibility into the system under test has proved to be a key element in the final qualification testing of aircraft digital flight-control systems. Three first-generation 8-bit units are now in service in support of several research aircraft projects, and user acceptance has been high. A second-generation design, extended AIDS (XAIDS), incorporating multiple 16-bit processors, is now being developed to support the forward swept wing aircraft project (X-29A). This paper outlines the AIDS concept, summarizes AIDS operational experience, and describes the planned XAIDS design and mechanization.
NARC Rayon Replacement Program for the RSRM Nozzle, Phase IV Qualification and Implementation Status
NASA Technical Reports Server (NTRS)
Haddock, M. Reed; Wendel, Gary M.; Cook, Roger V.
2005-01-01
The Space Shuttle NARC Rayon Replacement Program has down-selected Enka rayon as a replacement for the obsolete NARC rayon in the nozzle carbon cloth phenolic (CCP) ablative insulators. Full qualification testing of the Enka rayon-based carbon cloth phenolic is underway, including processing, thmal/structural properties, and hot-fire subscale tests. Required thermal-structural capabilities, together with confidence in erosio/char performance in simulated and subscale hot fire tests such as Wright-Patterson Air Force Base Laser Hardened Materials Evaluation Laboratory testing, NASA-MSFC 24-inch motor tests, NASA-MSFC Solid Fuel Torch - Super Sonic Blast Tube, NASA-MSFC Plasma Torch Test Bed, ATK Thiokol Forty Pound Charge and NASA-MSFC MNASA justified the testing of the new Enka-rayon candidate on full-scale static test motors. The first RSRM full-scale static test motor nozzle, fabricated using the new Enka rayon-based CCP, was successfully demonstrated in June 2004. Two additional static test motors are planned with the new Enka rayon in the next two years along with additional A-basis property characterization. Process variation or "corner-of-the-box" testing together with cured and uncured aging studies are also planned as some of the pre-flight implementation activities with 5-year cured aging studies over-lapping flight hardware fabrication.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-07
... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5481-N-18] Notice of Proposed Information Collection: Comment Request; CDBG Urban County Qualification/Requalification Process, Notice AGENCY: Office of Community Planning and Development, HUD. ACTION: Notice. SUMMARY: The proposed...
Ares I Integrated Test Approach
NASA Technical Reports Server (NTRS)
Taylor, Jim
2008-01-01
This slide presentation reviews the testing approach that NASA is developing for the Ares I launch vehicle. NASA is planning a complete series of development, qualification and verification tests. These include: (1) Upper stage engine sea-level and altitude testing (2) First stage development and qualification motors (3) Upper stage structural and thermal development and qualification test articles (4) Main Propulsion Test Article (MPTA) (5) Upper stage green run testing (6) Integrated Vehicle Ground Vibration Testing (IVGVT) and (7) Aerodynamic characterization testing.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-22
... Proposed Information Collection to OMB; Lender Qualifications for Multifamily Accelerated Processing (MAP) AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The proposed information...-processing plan that will take substantially less processing time than traditional processing. DATES...
NASA Technical Reports Server (NTRS)
Jackson, Karen E.; Boitnott, Richard L.; Fasanella, Edwin L.; Jones, Lisa E.; Lyle, Karen H.
2004-01-01
This paper summarizes 2-1/2 decades of full-scale aircraft and rotorcraft crash testing performed at the Impact Dynamics Research Facility (IDRF) located at NASA Langley Research Center in Hampton, Virginia. The IDRF is a 240-ft.-high steel gantry that was built originally as a lunar landing simulator facility in the early 1960's. It was converted into a full-scale crash test facility for light aircraft and rotorcraft in the early 1970 s. Since the first full-scale crash test was preformed in February 1974, the IDRF has been used to conduct: 41 full-scale crash tests of General Aviation (GA) aircraft including landmark studies to establish baseline crash performance data for metallic and composite GA aircraft; 11 full-scale crash tests of helicopters including crash qualification tests of the Bell and Sikorsky Advanced Composite Airframe Program (ACAP) prototypes; 48 Wire Strike Protection System (WSPS) qualification tests of Army helicopters; 3 vertical drop tests of Boeing 707 transport aircraft fuselage sections; and, 60+ crash tests of the F-111 crew escape module. For some of these tests, nonlinear transient dynamic codes were utilized to simulate the impact response of the airframe. These simulations were performed to evaluate the capabilities of the analytical tools, as well as to validate the models through test-analysis correlation. In September 2003, NASA Langley closed the IDRF facility and plans are underway to demolish it in 2007. Consequently, it is important to document the contributions made to improve the crashworthiness of light aircraft and rotorcraft achieved through full-scale crash testing and simulation at the IDRF.
NASA Technical Reports Server (NTRS)
Kim, Quiesup
2001-01-01
Key elements of space qualification of opto-electric and photonic optical devices were overviewed. Efforts were concentrated on the reliability concerns of the devices needed for potential applications in space environments. The ultimate goal for this effort is to gradually establish enough data to develop a space qualification plan of newly developed specific photonic parts using empirical and numerical models to assess the life-time and degradation of the devices for potential long term space missions.
BSA Delta Qualification 2, volume 3, book 1
NASA Technical Reports Server (NTRS)
1994-01-01
This report, presented in three volumes, provides the results of a two-motor Delta Qualification 2 program conducted in 1993 to certify the following enhancements for incorporation into booster separation motor (BSM) flight hardware: vulcanized-in-place nozzle aft closure insulation; new iso-static ATJ bulk graphite throat insert material; adhesive EA 9394 for bonding the nozzle throat, igniter grain rod/centering insert/igniter case; deletion of the igniter adapter insulator ring; deletion of the igniter adapter/igniter case interface RTV; and deletion of Loctite from igniter retainer plate threads. The enhancements above directly resulted from (1) the BSM total quality management (TQM) team initiatives to enhance the BSM producibility, and (2) the necessity to qualify new throat insert and adhesive systems to replace existing materials that will not be available. Testing was completed at both the component and motor levels. Component testing was accomplished to screen candidate materials (e.g., throat materials, adhesive systems) and to optimize processes (e.g., aft closure insulator vulcanization approach) prior to their incorporation into the test motors. Motor tests -- consisting of two motors, randomly selected by USBI's on-site quality personnel from production lot AAY, which were modified to accept the enhancements -- were completed to provide the final qualification of the enhancements for incorporation into flight hardware. Volume 3 book 1 provides supporting documentation to the analyses and plans of testing the two Delta Qualification units including thermal cycling planning/data acceptance records, environmental test procedures and pretest temperature conditioning history, Delta Qualification test plan, and specification SE0837 -- mix acceptance test specification.
Secondary Waste Simulant Development for Cast Stone Formulation Testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, Renee L.; Westsik, Joseph H.; Rinehart, Donald E.
Washington River Protection Solutions, LLC (WRPS) funded Pacific Northwest National Laboratory (PNNL) to conduct a waste form testing program to implement aspects of the Secondary Liquid Waste Treatment Cast Stone Technology Development Plan (Ashley 2012) and the Hanford Site Secondary Waste Roadmap (PNNL 2009) related to the development and qualification of Cast Stone as a potential waste form for the solidification of aqueous wastes from the Hanford Site after the aqueous wastes are treated at the Effluent Treatment Facility (ETF). The current baseline is that the resultant Cast Stone (or grout) solid waste forms would be disposed at the Integratedmore » Disposal Facility (IDF). Data and results of this testing program will be used in the upcoming performance assessment of the IDF and in the design and operation of a solidification treatment unit planned to be added to the ETF. The purpose of the work described in this report is to 1) develop simulants for the waste streams that are currently being fed and future WTP secondary waste streams also to be fed into the ETF and 2) prepare simulants to use for preparation of grout or Cast Stone solid waste forms for testing.« less
10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...
25 CFR 170.506 - What are the minimum qualifications for certified bridge inspectors?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What are the minimum qualifications for certified bridge inspectors? 170.506 Section 170.506 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads...
NASA Astrophysics Data System (ADS)
Guseva, A. I.; Kireev, V. S.; Silenko, A. N.; Tikhomirov, G. V.; Sheina, E. A.
2017-01-01
This article discusses the issues associated with the use of software simulators for the evaluation of competences for certification of qualifications of employees of the nuclear industry. This study was conducted for the expert and methodical center of assessment and certification of qualifications of specialists in the nuclear industry, based on the National nuclear innovation consortium. The goal of this study is to build a model for assessing the socio-personal competence and its realization in the form of a software simulator. The study was conducted among a large number of senior students MEPhI - future managers, IT professionals, and nuclear physicists. As a result of the survey five classes of students have been allocated differently performing case studies, and for and for different areas of training recommendations on the use of various educational technologies have been made.
Formal Assurance Certifiable Tooling Formal Assurance Certifiable Tooling Strategy Final Report
NASA Technical Reports Server (NTRS)
Bush, Eric; Oglesby, David; Bhatt, Devesh; Murugesan, Anitha; Engstrom, Eric; Mueller, Joe; Pelican, Michael
2017-01-01
This is the Final Report of a research project to investigate issues and provide guidance for the qualification of formal methods tools under the DO-330 qualification process. It consisted of three major subtasks spread over two years: 1) an assessment of theoretical soundness issues that may affect qualification for three categories of formal methods tools, 2) a case study simulating the DO-330 qualification of two actual tool sets, and 3) an investigation of risk mitigation strategies that might be applied to chains of such formal methods tools in order to increase confidence in their certification of airborne software.
Actual waste demonstration of the nitric-glycolic flowsheet for sludge batch 9 qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Newell, D.; Pareizs, J.; Martino, C.
For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch is processable. Based on the results of this actual-waste qualification and previous simulant studies, SRNL recommends implementation of the nitric-glycolic acid flowsheet in DWPF. Other recommendations resulting from this demonstration are reported in section 5.0.
Guidance on validation and qualification of processes and operations involving radiopharmaceuticals.
Todde, S; Peitl, P Kolenc; Elsinga, P; Koziorowski, J; Ferrari, V; Ocak, E M; Hjelstuen, O; Patt, M; Mindt, T L; Behe, M
2017-01-01
Validation and qualification activities are nowadays an integral part of the day by day routine work in a radiopharmacy. This document is meant as an Appendix of Part B of the EANM "Guidelines on Good Radiopharmacy Practice (GRPP)" issued by the Radiopharmacy Committee of the EANM, covering the qualification and validation aspects related to the small-scale "in house" preparation of radiopharmaceuticals. The aim is to provide more detailed and practice-oriented guidance to those who are involved in the small-scale preparation of radiopharmaceuticals which are not intended for commercial purposes or distribution. The present guideline covers the validation and qualification activities following the well-known "validation chain", that begins with editing the general Validation Master Plan document, includes all the required documentation (e.g. User Requirement Specification, Qualification protocols, etc.), and leads to the qualification of the equipment used in the preparation and quality control of radiopharmaceuticals, until the final step of Process Validation. A specific guidance to the qualification and validation activities specifically addressed to small-scale hospital/academia radiopharmacies is here provided. Additional information, including practical examples, are also available.
Design, Qualification, and On Orbit Performance of the CALIPSO Aerosol Lidar Transmitter
NASA Technical Reports Server (NTRS)
Hovis, Floyd E.; Witt, Greg; Sullivan, Edward T.; Le, Khoa; Weimer, Carl; Applegate, Jeff; Luck, William S., Jr.; Verhapen, Ron; Cisewski, Michael S.
2007-01-01
The laser transmitter for the CALIPSO aerosol lidar mission has been operating on orbit as planned since June 2006. This document discusses the optical and laser system design and qualification process that led to this success. Space-qualifiable laser design guidelines included the use of mature laser technologies, the use of alignment sensitive resonator designs, the development and practice of stringent contamination control procedures, the operation of all optical components at appropriately derated levels, and the proper budgeting for the space-qualification of the electronics and software.
Beginning Special Educators: Characteristics, Qualifications, and Experiences. SPeNSE Summary Sheet.
ERIC Educational Resources Information Center
Billingsley, Bonnie S.
This report from the Study of Personnel Needs in Special Education (SPeNSE) provides a profile of the characteristics, qualifications, work experiences, and career plans of teachers with fewer than 3 years of experience. Findings indicate: (1) beginning teachers were more likely to work in suburban systems (50 percent); (2) the majority do not…
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Inspection, continuing qualification evaluation, and maintenance requirements. 60.19 Section 60.19 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 135.338 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Has satisfactorily completed the training phases for the aircraft, including recurrent training, that... satisfactorily completed the appropriate training phases for the aircraft, including recurrent training, that are... AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Training § 135.338 Qualifications: Flight...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rizzo, Davinia B.; Blackburn, Mark R.
As systems become more complex, systems engineers rely on experts to inform decisions. There are few experts and limited data in many complex new technologies. This challenges systems engineers as they strive to plan activities such as qualification in an environment where technical constraints are coupled with the traditional cost, risk, and schedule constraints. Bayesian network (BN) models provide a framework to aid systems engineers in planning qualification efforts with complex constraints by harnessing expert knowledge and incorporating technical factors. By quantifying causal factors, a BN model can provide data about the risk of implementing a decision supplemented with informationmore » on driving factors. This allows a systems engineer to make informed decisions and examine “what-if” scenarios. This paper discusses a novel process developed to define a BN model structure based primarily on expert knowledge supplemented with extremely limited data (25 data sets or less). The model was developed to aid qualification decisions—specifically to predict the suitability of six degrees of freedom (6DOF) vibration testing for qualification. The process defined the model structure with expert knowledge in an unbiased manner. Finally, validation during the process execution and of the model provided evidence the process may be an effective tool in harnessing expert knowledge for a BN model.« less
Rizzo, Davinia B.; Blackburn, Mark R.
2018-03-30
As systems become more complex, systems engineers rely on experts to inform decisions. There are few experts and limited data in many complex new technologies. This challenges systems engineers as they strive to plan activities such as qualification in an environment where technical constraints are coupled with the traditional cost, risk, and schedule constraints. Bayesian network (BN) models provide a framework to aid systems engineers in planning qualification efforts with complex constraints by harnessing expert knowledge and incorporating technical factors. By quantifying causal factors, a BN model can provide data about the risk of implementing a decision supplemented with informationmore » on driving factors. This allows a systems engineer to make informed decisions and examine “what-if” scenarios. This paper discusses a novel process developed to define a BN model structure based primarily on expert knowledge supplemented with extremely limited data (25 data sets or less). The model was developed to aid qualification decisions—specifically to predict the suitability of six degrees of freedom (6DOF) vibration testing for qualification. The process defined the model structure with expert knowledge in an unbiased manner. Finally, validation during the process execution and of the model provided evidence the process may be an effective tool in harnessing expert knowledge for a BN model.« less
14 CFR 60.35 - Specific full flight simulator compliance requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE... the extent necessary for the training, testing, and/or checking that comprise the simulation portion...
14 CFR 60.35 - Specific full flight simulator compliance requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE... the extent necessary for the training, testing, and/or checking that comprise the simulation portion...
14 CFR 60.35 - Specific full flight simulator compliance requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE... the extent necessary for the training, testing, and/or checking that comprise the simulation portion...
14 CFR 60.35 - Specific full flight simulator compliance requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE... the extent necessary for the training, testing, and/or checking that comprise the simulation portion...
14 CFR 60.35 - Specific full flight simulator compliance requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE... the extent necessary for the training, testing, and/or checking that comprise the simulation portion...
SED16 autonomous star tracker night sky testing
NASA Astrophysics Data System (ADS)
Foisneau, Thierry; Piriou, Véronique; Perrimon, Nicolas; Jacob, Philippe; Blarre, Ludovic; Vilaire, Didier
2017-11-01
The SED16 is an autonomous multi-missions star tracker which delivers three axis satellite attitude in an inertial reference frame and the satellite angular velocity with no prior information. The qualification process of this star sensor includes five validation steps using optical star simulator, digitized image simulator and a night sky tests setup. The night sky testing was the final step of the qualification process during which all the functions of the star tracker were used in almost nominal conditions : Autonomous Acquisition of the attitude, Autonomous Tracking of ten stars. These tests were performed in Calern in the premises of the OCA (Observatoire de la Cote d'Azur). The test set-up and the test results are described after a brief review of the sensor main characteristics and qualification process.
Helicopter simulation: An aircrew training and qualification perspective
NASA Technical Reports Server (NTRS)
Birnbach, Richard A.; Longridge, Thomas M.
1992-01-01
This paper reviews some of the unique considerations that distinguish the commercial rotary wing domain from its fixed-wing counterpart. These considerations should give the FAA cause to proceed cautiously in drawing upon its fixed-wing experience. One major point to consider is the following: device qualification should be accomplished in a context of an overall training and qualification system. This approach would take as its starting point a detailed analysis of rotary-wing missions and tasks from which proficiency objectives can be systematically developed.
ERIC Educational Resources Information Center
Borghans, Lex; de Grip, Andries; Heijke, Hans
The problem of planning and making labor market forecasts by occupation and qualification in the context of a constantly changing labor market was examined. The examination focused on the following topics: assumptions, benefits, and pitfalls of the labor requirement model of projecting future imbalances between labor supply and demand for certain…
MEMS Reliability Assurance Guidelines for Space Applications
NASA Technical Reports Server (NTRS)
Stark, Brian (Editor)
1999-01-01
This guide is a reference for understanding the various aspects of microelectromechanical systems, or MEMS, with an emphasis on device reliability. Material properties, failure mechanisms, processing techniques, device structures, and packaging techniques common to MEMS are addressed in detail. Design and qualification methodologies provide the reader with the means to develop suitable qualification plans for the insertion of MEMS into the space environment.
14 CFR 60.14 - Special equipment and personnel requirements for qualification of the FSTD.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Special equipment and personnel requirements for qualification of the FSTD. 60.14 Section 60.14 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.14 - Special equipment and personnel requirements for qualification of the FSTD.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Special equipment and personnel requirements for qualification of the FSTD. 60.14 Section 60.14 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.14 - Special equipment and personnel requirements for qualification of the FSTD.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Special equipment and personnel requirements for qualification of the FSTD. 60.14 Section 60.14 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.14 - Special equipment and personnel requirements for qualification of the FSTD.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Special equipment and personnel requirements for qualification of the FSTD. 60.14 Section 60.14 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.14 - Special equipment and personnel requirements for qualification of the FSTD.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Special equipment and personnel requirements for qualification of the FSTD. 60.14 Section 60.14 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).
Code of Federal Regulations, 2010 CFR
2010-01-01
... satisfactorily completed the training phases for the aircraft, including recurrent training, that are required to... under this part; (2) Has satisfactorily completed the appropriate training phases for the aircraft... ON BOARD SUCH AIRCRAFT Training § 135.337 Qualifications: Check airmen (aircraft) and check airmen...
NASA Technical Reports Server (NTRS)
Wilkenfeld, J. M.; Judge, R. J. R.; Harlacher, B. L.
1982-01-01
A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. The data on the response of a simple satellite model, called CAN, to electron-induced discharges is presented. The experimental results were compared to predicted behavior and to the response of the CAN to electrical injection techniques simulating blowoff and arc discharges. Also included is a review of significant results from other ground tests and the P78-2 program to form a data base from which is specified those test procedures which optimally simulate the response of spacecraft to EID. The electrical and electron spraying test data were evaluated to provide a first-cut determination of the best methods for performance of electrical excitation qualification tests from the point of view of simulation fidelity.
26 CFR 1.401-12 - Requirements for qualification of trusts and plans benefiting owner-employees.
Code of Federal Regulations, 2014 CFR
2014-04-01
... plan and may not be amended except for a valid business reason. (3) The requirement that a profit... “wages” under section 3121(a)(1). (4) A money purchase pension plan or a profit-sharing plan may provide... property, other than money, made after December 31, 1974. (l) Controlled trades or businesses—(1) Plans...
26 CFR 1.401-12 - Requirements for qualification of trusts and plans benefiting owner-employees.
Code of Federal Regulations, 2011 CFR
2011-04-01
... plan and may not be amended except for a valid business reason. (3) The requirement that a profit... “wages” under section 3121(a)(1). (4) A money purchase pension plan or a profit-sharing plan may provide... property, other than money, made after December 31, 1974. (l) Controlled trades or businesses—(1) Plans...
26 CFR 1.401-12 - Requirements for qualification of trusts and plans benefiting owner-employees.
Code of Federal Regulations, 2012 CFR
2012-04-01
... plan and may not be amended except for a valid business reason. (3) The requirement that a profit... “wages” under section 3121(a)(1). (4) A money purchase pension plan or a profit-sharing plan may provide... property, other than money, made after December 31, 1974. (l) Controlled trades or businesses—(1) Plans...
26 CFR 1.401-12 - Requirements for qualification of trusts and plans benefiting owner-employees.
Code of Federal Regulations, 2013 CFR
2013-04-01
... plan and may not be amended except for a valid business reason. (3) The requirement that a profit... “wages” under section 3121(a)(1). (4) A money purchase pension plan or a profit-sharing plan may provide... property, other than money, made after December 31, 1974. (l) Controlled trades or businesses—(1) Plans...
26 CFR 1.401-12 - Requirements for qualification of trusts and plans benefiting owner-employees.
Code of Federal Regulations, 2010 CFR
2010-04-01
... plan and may not be amended except for a valid business reason. (3) The requirement that a profit... “wages” under section 3121(a)(1). (4) A money purchase pension plan or a profit-sharing plan may provide... property, other than money, made after December 31, 1974. (l) Controlled trades or businesses—(1) Plans...
42 CFR 409.42 - Beneficiary qualifications for coverage of services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... plan of care. A doctor of podiatric medicine may establish a plan of care only if that is consistent... appropriate to the patient's illness, functional loss, or injury. (2) Physical therapy services that meet the...
42 CFR 409.42 - Beneficiary qualifications for coverage of services.
Code of Federal Regulations, 2012 CFR
2012-10-01
... plan of care. A doctor of podiatric medicine may establish a plan of care only if that is consistent... appropriate to the patient's illness, functional loss, or injury. (2) Physical therapy services that meet the...
42 CFR 409.42 - Beneficiary qualifications for coverage of services.
Code of Federal Regulations, 2013 CFR
2013-10-01
... plan of care. A doctor of podiatric medicine may establish a plan of care only if that is consistent... appropriate to the patient's illness, functional loss, or injury. (2) Physical therapy services that meet the...
42 CFR 409.42 - Beneficiary qualifications for coverage of services.
Code of Federal Regulations, 2011 CFR
2011-10-01
... plan of care. A doctor of podiatric medicine may establish a plan of care only if that is consistent... appropriate to the patient's illness, functional loss, or injury. (2) Physical therapy services that meet the...
42 CFR 409.42 - Beneficiary qualifications for coverage of services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... plan of care. A doctor of podiatric medicine may establish a plan of care only if that is consistent... appropriate to the patient's illness, functional loss, or injury. (2) Physical therapy services that meet the...
29 CFR 547.1 - Essential requirements for qualifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
... in accordance with a definite formula specified in the plan, which formula may be based on one or... formula or method of calculation specified in the plan, which formula or method of calculation is based on...
NASA Technical Reports Server (NTRS)
Moehlmann, D.; Kochan, H.
1992-01-01
The Space Simulator of the German Aerospace Research Establishment at Cologne, formerly used for testing satellites, is now, since 1987, the central unit within the research sub-program 'Comet-Simulation' (KOSI). The KOSI team has investigated physical processes relevant to comets and their surfaces. As a byproduct we gained experience in sample-handling under simulated space conditions. In broadening the scope of the research activities of the DLR Institute of Space Simulation an extension to 'Laboratory-Planetology' is planned. Following the KOSI-experiments a Mars Surface-Simulation with realistic minerals and surface soil in a suited environment (temperature, pressure, and CO2-atmosphere) is foreseen as the next step. Here, our main interest is centered on thermophysical properties of the Martian surface and energy transport (and related gas transport) through the surface. These laboratory simulation activities can be related to space missions as typical pre-mission and during-the-mission support of the experiments design and operations (simulation in parallel). Post mission experiments for confirmation and interpretation of results are of great value. The physical dimensions of the Space Simulator (cylinder of about 2.5 m diameter and 5 m length) allows for testing and qualification of experimental hardware under realistic Martian conditions.
NASA Technical Reports Server (NTRS)
Hochstadt, Jake
2011-01-01
Ruby on Rails is an open source web application framework for the Ruby programming language. The first application I built was a web application to manage and authenticate other applications. One of the main requirements for this application was a single sign-on service. This allowed authentication to be built in one location and be implemented in many different applications. For example, users would be able to login using their existing credentials, and be able to access other NASA applications without authenticating again. The second application I worked on was an internal qualification plan app. Previously, the viewing of employee qualifications was managed through Excel spread sheets. I built a database driven application to streamline the process of managing qualifications. Employees would be able to login securely to view, edit and update their personal qualifications.
Intermediate load modules for test and evaluation
NASA Technical Reports Server (NTRS)
1984-01-01
Photovoltaic modules were tested for qualification. Tests involved the following: (1) delivery of 20 solar cells for use as reference cells; (2) module documentation and inspection plans specifying the 10 Group I modules; (3) design review of module documentation from Group I modules; (4) revise module documentation to overcome any problems of deficiencies associated with the Group I modules; (5) delivery of 10 Group II modules built to revised specifications; (6) testing of Group II modules to the criteria as outlined in qualification specification. It is found that the solarvolt MSP43E40B satisfies the design criteria of qualification specification for intermediate load modules. Design changes were made in the Group I modules to overcome the deficiencies which allowed Group II modules to pass the qualification tests.
Acoustic Analysis and Design of the E-STA MSA Simulator
NASA Technical Reports Server (NTRS)
Bittinger, Samantha A.
2016-01-01
The Orion European Service Module Structural Test Article (E-STA) Acoustic Test was completed in May 2016 to verify that the European Service Module (ESM) can withstand qualification acoustic environments. The test article required an aft closeout to simulate the Multi-Purpose Crew Vehicle (MPCV) Stage Adapter (MSA) cavity, however, the flight MSA design was too cost-prohibitive to build. NASA Glenn Research Center (GRC) had 6 months to design an MSA Simulator that could recreate the qualification prediction MSA cavity sound pressure level to within a reasonable tolerance. This paper summarizes the design and analysis process to arrive at a design for the MSA Simulator, and then compares its performance to the final prediction models created prior to test.
Air traffic control in airline pilot simulator training and evaluation
DOT National Transportation Integrated Search
2001-01-01
Much airline pilot training and checking occurs entirely in the simulator, and the first time a pilot flies a particular airplane, it may carry passengers. Simulator qualification standards, however, focus on the simulation of the airplane without re...
Qualification test and analysis report: Solar collectors
NASA Technical Reports Server (NTRS)
1978-01-01
Test results show that the Owens-Illinois Sunpak TM Model SEC 601 air-cooled collector meets the national standards and codes as defined in the Subsystem Peformance Specification and Verification Plan of NASA/MSFC, dated October 28, 1976. The program calls for the development, fabrication, qualification and delivery of an air-cooled solar collector for solar heating, combined heating and cooling, and/or hot water systems.
AGR-1 Thermocouple Data Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeff Einerson
2012-05-01
This report documents an effort to analyze measured and simulated data obtained in the Advanced Gas Reactor (AGR) fuel irradiation test program conducted in the INL's Advanced Test Reactor (ATR) to support the Next Generation Nuclear Plant (NGNP) R&D program. The work follows up on a previous study (Pham and Einerson, 2010), in which statistical analysis methods were applied for AGR-1 thermocouple data qualification. The present work exercises the idea that, while recognizing uncertainties inherent in physics and thermal simulations of the AGR-1 test, results of the numerical simulations can be used in combination with the statistical analysis methods tomore » further improve qualification of measured data. Additionally, the combined analysis of measured and simulation data can generate insights about simulation model uncertainty that can be useful for model improvement. This report also describes an experimental control procedure to maintain fuel target temperature in the future AGR tests using regression relationships that include simulation results. The report is organized into four chapters. Chapter 1 introduces the AGR Fuel Development and Qualification program, AGR-1 test configuration and test procedure, overview of AGR-1 measured data, and overview of physics and thermal simulation, including modeling assumptions and uncertainties. A brief summary of statistical analysis methods developed in (Pham and Einerson 2010) for AGR-1 measured data qualification within NGNP Data Management and Analysis System (NDMAS) is also included for completeness. Chapters 2-3 describe and discuss cases, in which the combined use of experimental and simulation data is realized. A set of issues associated with measurement and modeling uncertainties resulted from the combined analysis are identified. This includes demonstration that such a combined analysis led to important insights for reducing uncertainty in presentation of AGR-1 measured data (Chapter 2) and interpretation of simulation results (Chapter 3). The statistics-based simulation-aided experimental control procedure described for the future AGR tests is developed and demonstrated in Chapter 4. The procedure for controlling the target fuel temperature (capsule peak or average) is based on regression functions of thermocouple readings and other relevant parameters and accounting for possible changes in both physical and thermal conditions and in instrument performance.« less
14 CFR 60.37 - FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA).
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA). 60.37 Section 60.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.37 - FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA).
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA). 60.37 Section 60.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.37 - FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA). 60.37 Section 60.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.37 - FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA).
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA). 60.37 Section 60.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
14 CFR 60.37 - FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false FSTD qualification on the basis of a Bilateral Aviation Safety Agreement (BASA). 60.37 Section 60.37 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND...
42 CFR 417.165 - Reapplication for qualification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES (CONTINUED) MEDICARE PROGRAM HEALTH MAINTENANCE ORGANIZATIONS, COMPETITIVE MEDICAL PLANS, AND HEALTH CARE PREPAYMENT PLANS Continued Regulation of Federally Qualified Health Maintenance Organizations... CMS for purposes of section 1310 of the PHS Act may, after completing the corrective action required...
Open-Source RTOS Space Qualification: An RTEMS Case Study
NASA Technical Reports Server (NTRS)
Zemerick, Scott
2017-01-01
NASA space-qualification of reusable off-the-shelf real-time operating systems (RTOSs) remains elusive due to several factors notably (1) The diverse nature of RTOSs utilized across NASA, (2) No single NASA space-qualification criteria, lack of verification and validation (V&V) analysis, or test beds, and (3) different RTOS heritages, specifically open-source RTOSs and closed vendor-provided RTOSs. As a leader in simulation test beds, the NASA IV&V Program is poised to help jump-start and lead the space-qualification effort of the open source Real-Time Executive for Multiprocessor Systems (RTEMS) RTOS. RTEMS, as a case-study, can be utilized as an example of how to qualify all RTOSs, particularly the reusable non-commercial (open-source) ones that are gaining usage and popularity across NASA. Qualification will improve the overall safety and mission assurance of RTOSs for NASA-agency wide usage. NASA's involvement in space-qualification of an open-source RTOS such as RTEMS will drive the RTOS industry toward a more qualified and mature open-source RTOS product.
Super NiCd Open-Circuit Storage and Low Earth Orbit (LEO) Life Test Evaluation
NASA Technical Reports Server (NTRS)
Baer, Jean Marie; Hwang, Warren C.; Ang, Valerie J.; Hayden, Jeff; Rao, Gopalakrishna; Day, John H. (Technical Monitor)
2002-01-01
This presentation discusses Air Force tests performed on super NiCd cells to measure their performance under conditions simulating Low Earth Orbit (LEO) conditions. Super NiCd cells offer potential advantages over existing NiCd cell designs including advanced cell design with improved separator material and electrode making processes, but handling and storage requires active charging. These tests conclude that the super NiCd cells support generic Air Force qualifications for conventional LEO missions (up to five years duration) and that handling and storage may not actually require active charging as previously assumed. Topics covered include: Test Plan, Initial Characterization Tests, Open-Circuit Storage Tests, and post storage capacities.
NASA Technical Reports Server (NTRS)
Jackola, Arthur S.; Hartjen, Gary L.
1992-01-01
The plans for a new test facility, including new environmental test systems, which are presently under construction, and the major environmental Test Support Equipment (TSE) used therein are addressed. This all-new Rocketdyne facility will perform space simulation environmental tests on Power Management and Distribution (PMAD) hardware to Space Station Freedom (SSF) at the Engineering Model, Qualification Model, and Flight Model levels of fidelity. Testing will include Random Vibration in three axes - Thermal Vacuum, Thermal Cycling and Thermal Burn-in - as well as numerous electrical functional tests. The facility is designed to support a relatively high throughput of hardware under test, while maintaining the high standards required for a man-rated space program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.1 Applicability. (a) This part... simulation training devices (FSTD) used for meeting training, evaluation, or flight experience requirements...
Code of Federal Regulations, 2011 CFR
2011-01-01
... SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.1 Applicability. (a) This part... simulation training devices (FSTD) used for meeting training, evaluation, or flight experience requirements...
Code of Federal Regulations, 2014 CFR
2014-01-01
... SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.1 Applicability. (a) This part... simulation training devices (FSTD) used for meeting training, evaluation, or flight experience requirements...
Code of Federal Regulations, 2010 CFR
2010-01-01
... SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.1 Applicability. (a) This part... simulation training devices (FSTD) used for meeting training, evaluation, or flight experience requirements...
Code of Federal Regulations, 2012 CFR
2012-01-01
... SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.1 Applicability. (a) This part... simulation training devices (FSTD) used for meeting training, evaluation, or flight experience requirements...
Proposed Plan for Magnet Schools--Cleveland Public Schools. Section II, Health Careers Center.
ERIC Educational Resources Information Center
Fleming, Margaret, Ed.; And Others
A plan for a magnet school health careers program for 11th and 12th graders, intended to promote desegregation and provide improved educational opportunities for Cleveland students, is described in this proposal. Detailed descriptions cover staff requirements and qualifications, staff development plans, curriculum, and support activities. Included…
14 CFR 121.921 - Training devices and simulators.
Code of Federal Regulations, 2013 CFR
2013-01-01
... devices and simulators. (a) Each flight training device or airplane simulator that will be used in an AQP... device or flight simulator qualification level: (1) Required evaluation of individual or crew proficiency... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Training devices and simulators. 121.921...
14 CFR 121.921 - Training devices and simulators.
Code of Federal Regulations, 2011 CFR
2011-01-01
... devices and simulators. (a) Each flight training device or airplane simulator that will be used in an AQP... device or flight simulator qualification level: (1) Required evaluation of individual or crew proficiency... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Training devices and simulators. 121.921...
14 CFR 121.921 - Training devices and simulators.
Code of Federal Regulations, 2014 CFR
2014-01-01
... devices and simulators. (a) Each flight training device or airplane simulator that will be used in an AQP... device or flight simulator qualification level: (1) Required evaluation of individual or crew proficiency... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Training devices and simulators. 121.921...
14 CFR 121.921 - Training devices and simulators.
Code of Federal Regulations, 2012 CFR
2012-01-01
... devices and simulators. (a) Each flight training device or airplane simulator that will be used in an AQP... device or flight simulator qualification level: (1) Required evaluation of individual or crew proficiency... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Training devices and simulators. 121.921...
Conduct and Results of YF-16 RPRV Stall/Spin Drop Model Tests
1977-04-01
Bomb Recovery System Tests Iron Bird Recovery System Tests Captive Flights Typical Flight Operations Flight Planning and Pilot Training...helicopter tow qualification test, one model tow qualification test, three Iron Bird parachute recovery system verification tests, three captive tests...Corresponding Full-Scale YF-16 Altitude -Reference 1: Woodcock , Robert J., Some Notes on Free-Flight Model Seal- ing, AFFDL-TM-73-123-FCC, Air Force Flight
Leveraging DMO’s Hi-Tech Simulation Against the F-16 Flying Training Gap
2005-04-01
39-49. 6 United States Department of Transportation, Airplance Simulator Qualification, Report AC No.120-40B (Washington, DC: Federal Aviation...and Motion Simulation Conference. Binghamton, NY: Singer-Simulation Products Division, 1976. United States Department of Transportation. Airplance
AF Ni-Cd cell qualification program
NASA Technical Reports Server (NTRS)
Hall, Steve; Brown, Harry; Collins, G.; Hwang, Warren
1994-01-01
The present status of the USAF NiCd cell qualification program, which is underway at the Naval Surface Warfare Center-Crane Division, is summarized. The following topics are discussed: overview; background; purpose; stress tests; results for super Ni-Cd; results for SAFT cells; GPS stress test; GPS simulated orbit; and results for gates cells. The discussion is presented in viewgraph format.
Technology Readiness of the NEXT Ion Propulsion System
NASA Technical Reports Server (NTRS)
Benson, Scott W.; Patterson, Michael J.
2008-01-01
The NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system has been in advanced technology development under the NASA In-Space Propulsion Technology project. The highest fidelity hardware planned has now been completed by the government/industry team, including: a flight prototype model (PM) thruster, an engineering model (EM) power processing unit, EM propellant management assemblies, a breadboard gimbal, and control unit simulators. Subsystem and system level technology validation testing is in progress. To achieve the objective Technology Readiness Level 6, environmental testing is being conducted to qualification levels in ground facilities simulating the space environment. Additional tests have been conducted to characterize the performance range and life capability of the NEXT thruster. This paper presents the status and results of technology validation testing accomplished to date, the validated subsystem and system capabilities, and the plans for completion of this phase of NEXT development. The next round of competed planetary science mission announcements of opportunity, and directed mission decisions, are anticipated to occur in 2008 and 2009. Progress to date, and the success of on-going technology validation, indicate that the NEXT ion propulsion system will be a primary candidate for mission consideration in these upcoming opportunities.
14 CFR 121.915 - Continuing qualification curriculum.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., flight training device, flight simulator, or other equipment, as appropriate, on normal, abnormal, and... training in the type flight training device or the type flight simulator, as appropriate, regarding... flight simulators or flight training devices: Training in operational flight procedures and maneuvers...
14 CFR 121.915 - Continuing qualification curriculum.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., flight training device, flight simulator, or other equipment, as appropriate, on normal, abnormal, and... training in the type flight training device or the type flight simulator, as appropriate, regarding... flight simulators or flight training devices: Training in operational flight procedures and maneuvers...
14 CFR 121.915 - Continuing qualification curriculum.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., flight training device, flight simulator, or other equipment, as appropriate, on normal, abnormal, and... training in the type flight training device or the type flight simulator, as appropriate, regarding... flight simulators or flight training devices: Training in operational flight procedures and maneuvers...
Code of Federal Regulations, 2010 CFR
2010-04-01
... letters and documents relating to pension and other plans. 301.6104(a)-3 Section 301.6104(a)-3 Internal... of Internal Revenue Service letters and documents relating to pension and other plans. (a) In general... qualification of a pension, profit-sharing or stock bonus plan under section 401(a), an annuity plan under...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-18
... procedures, physical security plan, guard training and qualification plan, or cyber security plan for the... Power Plant Unit 1, Exemption From Certain Security Requirements 1.0 Background DTE Energy (DTE) is the... atmospheric pressure. In November 1972, the Power Reactor Development Company (PRDC), the licensee at that...
How to Select a Planning and Design Consultant
ERIC Educational Resources Information Center
Kalina, Dave
2006-01-01
This article offer guidance for selecting and hiring an architect or planner, as well as insight regarding consultant fees and what can be expected for the money. This article is dedicated to planning--specifically, what to look for and how to find a planning professional. Furthermore, it is stated that in the qualifications-based process,…
Mechanical Analysis of W78/88-1 Life Extension Program Warhead Design Options
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spencer, Nathan
2014-09-01
Life Extension Program (LEP) is a program to repair/replace components of nuclear weapons to ensure the ability to meet military requirements. The W78/88-1 LEP encompasses the modernization of two major nuclear weapon reentry systems into an interoperable warhead. Several design concepts exist to provide different options for robust safety and security themes, maximum non-nuclear commonality, and cost. Simulation is one capability used to evaluate the mechanical performance of the designs in various operational environments, plan for system and component qualification efforts, and provide insight into the survivability of the warhead in environments that are not currently testable. The simulation effortsmore » use several Sandia-developed tools through the Advanced Simulation and Computing program, including Cubit for mesh generation, the DART Model Manager, SIERRA codes running on the HPC TLCC2 platforms, DAKOTA, and ParaView. Several programmatic objectives were met using the simulation capability including: (1) providing early environmental specification estimates that may be used by component designers to understand the severity of the loads their components will need to survive, (2) providing guidance for load levels and configurations for subassembly tests intended to represent operational environments, and (3) recommending design options including modified geometry and material properties. These objectives were accomplished through regular interactions with component, system, and test engineers while using the laboratory's computational infrastructure to effectively perform ensembles of simulations. Because NNSA has decided to defer the LEP program, simulation results are being documented and models are being archived for future reference. However, some advanced and exploratory efforts will continue to mature key technologies, using the results from these and ongoing simulations for design insights, test planning, and model validation.« less
Contamination control program plan for the ultraviolet spectrometer experiment, revision E
NASA Technical Reports Server (NTRS)
Gilmore, D. B.
1972-01-01
The contamination control program plan delineates the cleanliness requirements to be attained and maintained, and the methods to be utilized, in the fabrication, handling, test, calibration, shipment, pre-installation checkout and installation for the ultraviolet spectrometer experiment prototype, qualification and flight equipment.
40 CFR 62.14610 - How do I maintain my operator qualification?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...) Responses to malfunctions or conditions that may lead to malfunction. (e) Discussion of operating problems...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Amoroso, J.; Peeler, D.; Edwards, T.
2012-05-11
A recommendation to eliminate all characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification sample was made by a Six-Sigma team chartered to eliminate non-value-added activities for the Defense Waste Processing Facility (DWPF) sludge batch qualification program and is documented in the report SS-PIP-2006-00030. That recommendation was supported through a technical data review by the Savannah River National Laboratory (SRNL) and is documented in the memorandums SRNL-PSE-2007-00079 and SRNL-PSE-2007-00080. At the time of writing those memorandums, the DWPF was processing sludge-only waste but, has since transitioned to a coupledmore » operation (sludge and salt). The SRNL was recently tasked to perform a similar data review relevant to coupled operations and re-evaluate the previous recommendations. This report evaluates the validity of eliminating the characterization of pour stream glass samples and the glass fabrication and Product Consistency Test (PCT) of the sludge batch qualification samples based on sludge-only and coupled operations. The pour stream sample has confirmed the DWPF's ability to produce an acceptable waste form from Slurry Mix Evaporator (SME) blending and product composition/durability predictions for the previous sixteen years but, ultimately the pour stream analysis has added minimal value to the DWPF's waste qualification strategy. Similarly, the information gained from the glass fabrication and PCT of the sludge batch qualification sample was determined to add minimal value to the waste qualification strategy since that sample is routinely not representative of the waste composition ultimately processed at the DWPF due to blending and salt processing considerations. Moreover, the qualification process has repeatedly confirmed minimal differences in glass behavior from actual radioactive waste to glasses fabricated from simulants or batch chemicals. In contrast, the variability study has significantly added value to the DWPF's qualification strategy. The variability study has evolved to become the primary aspect of the DWPF's compliance strategy as it has been shown to be versatile and capable of adapting to the DWPF's various and diverse waste streams and blending strategies. The variability study, which aims to ensure durability requirements and the PCT and chemical composition correlations are valid for the compositional region to be processed at the DWPF, must continue to be performed. Due to the importance of the variability study and its place in the DWPF's qualification strategy, it will also be discussed in this report. An analysis of historical data and Production Records indicated that the recommendation of the Six Sigma team to eliminate all characterization of pour stream glass samples and the glass fabrication and PCT performed with the qualification glass does not compromise the DWPF's current compliance plan. Furthermore, the DWPF should continue to produce an acceptable waste form following the remaining elements of the Glass Product Control Program; regardless of a sludge-only or coupled operations strategy. If the DWPF does decide to eliminate the characterization of pour stream samples, pour stream samples should continue to be collected for archival reasons, which would allow testing to be performed should any issues arise or new repository test methods be developed.« less
Methods Data Qualification Interim Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
R. Sam Alessi; Tami Grimmett; Leng Vang
The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models representmore » the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.« less
48 CFR 1509.502 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.502 Applicability. This... applies to contracts with the Small Business Administration (SBA) under the 8(a) program. ...
Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center
NASA Technical Reports Server (NTRS)
Ernst, E. W.; Sass, J. P.; Lobemeyer, D. A.; Sojourner, S. J.; Hatfield, W. H.; Rewinkel, D. A.
2007-01-01
The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility
14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).
Code of Federal Regulations, 2013 CFR
2013-01-01
... simulator, or in a flight training device for a particular type aircraft. (2) A check pilot (simulator) is a person who is qualified to conduct flight checks, but only in a flight simulator, in a flight training... (simulator) must accomplish the following— (1) Fly at least two flight segments as a required crewmember for...
14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).
Code of Federal Regulations, 2014 CFR
2014-01-01
... simulator, or in a flight training device for a particular type aircraft. (2) A check pilot (simulator) is a person who is qualified to conduct flight checks, but only in a flight simulator, in a flight training... (simulator) must accomplish the following— (1) Fly at least two flight segments as a required crewmember for...
14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).
Code of Federal Regulations, 2012 CFR
2012-01-01
... simulator, or in a flight training device for a particular type aircraft. (2) A check pilot (simulator) is a person who is qualified to conduct flight checks, but only in a flight simulator, in a flight training... (simulator) must accomplish the following— (1) Fly at least two flight segments as a required crewmember for...
48 CFR 509.105-1 - Obtaining information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 509.105-1... any appropriate activities, e.g., legal counsel, quality control, contract management, credit and...
14 CFR 135.338 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2013 CFR
2013-01-01
... (aircraft) and flight instructors (simulator). 135.338 Section 135.338 Aeronautics and Space FEDERAL... instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this section and § 135.340... flight simulator, or in a flight training device for a particular type, class, or category aircraft. (2...
14 CFR 135.338 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2011 CFR
2011-01-01
... (aircraft) and flight instructors (simulator). 135.338 Section 135.338 Aeronautics and Space FEDERAL... instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this section and § 135.340... flight simulator, or in a flight training device for a particular type, class, or category aircraft. (2...
14 CFR 135.338 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2014 CFR
2014-01-01
... (aircraft) and flight instructors (simulator). 135.338 Section 135.338 Aeronautics and Space FEDERAL... instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this section and § 135.340... flight simulator, or in a flight training device for a particular type, class, or category aircraft. (2...
14 CFR 135.338 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2012 CFR
2012-01-01
... (aircraft) and flight instructors (simulator). 135.338 Section 135.338 Aeronautics and Space FEDERAL... instructors (aircraft) and flight instructors (simulator). (a) For the purposes of this section and § 135.340... flight simulator, or in a flight training device for a particular type, class, or category aircraft. (2...
DOT National Transportation Integrated Search
2009-11-01
The objectives of this study are to pre-test analyze a decommissioned reinforced concrete (RC) bridge that is selected in consultation with the New York State Department of Transportation (NYSDOT), and design and plan the field tests of the bridge fo...
Plan for Progress in the Media Center.
ERIC Educational Resources Information Center
Iowa State Dept. of Public Instruction, Des Moines.
The outpouring of new instructional materials and techniques has resulted in a demand for instructional materials centers at the elementary school level. This handbook has been published to assist in planning and developing such a facility. The media center's usefullness to students, teachers, and administrators is outlined. The qualifications and…
VET Providers Planning to Deliver Degrees: Good Practice Guide
ERIC Educational Resources Information Center
National Centre for Vocational Education Research (NCVER), 2015
2015-01-01
This good practice guide is intended to assist public and private registered training organisations (RTOs) planning to commence higher education (HE) delivery. The guide is based on research undertaken by Victor Callan and Kaye Bowman, who completed case studies with six providers currently delivering higher education qualifications in addition to…
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5... prohibit the acceptance of production contracts following a related non-production contract previously...
Proposed acceptance, qualification, and characterization tests for thin-film PV modules
NASA Technical Reports Server (NTRS)
Waddington, D.; Mrig, L.; Deblasio, R.; Ross, R.
1988-01-01
Details of a proposed test program for PV thin-film modules which the Department of Energy has directed the Solar Energy Research Institute (SERI) to prepare are presented. Results of one of the characterization tests that SERI has performed are also presented. The objective is to establish a common approach to testing modules that will be acceptable to both users and manufacturers. The tests include acceptance, qualification, and characterization tests. Acceptance tests verify that randomly selected modules have similar characteristics. Qualification tests are based on accelerated test methods designed to simulate adverse conditions. Characterization tests provide data on performance in a predefined environment.
Standard High Solids Vessel Design De-inventory Simulant Qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fiskum, Sandra K.; Burns, Carolyn A.M.; Gauglitz, Phillip A.
The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is working to develop a Standard High Solids Vessel Design (SHSVD) process vessel. To support testing of this new design, WTP engineering staff requested that a Newtonian simulant be developed that would represent the de-inventory (residual high-density tank solids cleanout) process. Its basis and target characteristics are defined in 24590-WTP-ES-ENG-16-021 and implemented through PNNL Test Plan TP-WTPSP-132 Rev. 1.0. This document describes the de-inventory Newtonian carrier fluid (DNCF) simulant composition that will satisfy the basis requirement to mimic the density (1.18 g/mL ± 0.1 g/mL) and viscosity (2.8 cP ± 0.5more » cP) of 5 M NaOH at 25 °C.1 The simulant viscosity changes significantly with temperature. Therefore, various solution compositions may be required, dependent on the test stand process temperature range, to meet these requirements. Table ES.1 provides DNCF compositions at selected temperatures that will meet the density and viscosity specifications as well as the temperature range at which the solution will meet the acceptable viscosity tolerance.« less
NASA Astrophysics Data System (ADS)
Simpson, R.; Broussely, M.; Edwards, G.; Robinson, D.; Cozzani, A.; Casarosa, G.
2012-07-01
The National Physical Laboratory (NPL) and The European Space Research and Technology Centre (ESTEC) have performed for the first time successful surface temperature measurements using infrared thermal imaging in the ESTEC Large Space Simulator (LSS) under vacuum and with the Sun Simulator (SUSI) switched on during thermal qualification tests of the GAIA Deployable Sunshield Assembly (DSA). The thermal imager temperature measurements, with radiosity model corrections, show good agreement with thermocouple readings on well characterised regions of the spacecraft. In addition, the thermal imaging measurements identified potentially misleading thermocouple temperature readings and provided qualitative real-time observations of the thermal and spatial evolution of surface structure changes and heat dissipation during hot test loadings, which may yield additional thermal and physical measurement information through further research.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2009.470 Appeals. A... for Operations. A copy of the notice of appeal must be furnished to the debarring/suspending official. ...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
48 CFR 1809.670 - Contract clause.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 1809.670 Contract... solicitations and contracts to clarify a contractor team arrangement where the prime contractor consists of more...
Helicopter/Ship Qualification Testing (Les essais de qualification helicoptere/navire)
2003-02-01
maximum all-up masses of the helicopter; • wind limitations. The data are presented as a polar diagramme , the radius representing the wind speed and the...Systems CAD Cartridge Actuated Device CG Center of Gravity DI Dynamic Interface EFP Elevated Fixed Platform FA Fore Aft FFG Guided Missile Fast Frigate...not be able to complete all the planned data points. The nature of DI testing results in a fast paced test program once flight testing begins. It is
49 CFR 213.345 - Vehicle/track system qualification.
Code of Federal Regulations, 2013 CFR
2013-10-01
... in accordance with the requirements of this paragraph (c). (1) Simulations or measurement of wheel/rail forces. For vehicle types intended to operate at track Class 6 speeds, simulations or measurement... exceed the wheel/rail force safety limits specified in § 213.333. Simulations, if conducted, shall be in...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Activities: Requests for Comments; Clearance of Renewed Approval of Information Collection: Flight Simulation... obtained and maintained by those who conduct flight simulation training. DATES: Written comments should be... Simulation Device Initial and Continuing Qualification and Use. Form Numbers: There are no FAA forms...
49 CFR 213.345 - Vehicle/track system qualification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... in accordance with the requirements of this paragraph (c). (1) Simulations or measurement of wheel/rail forces. For vehicle types intended to operate at track Class 6 speeds, simulations or measurement... exceed the wheel/rail force safety limits specified in § 213.333. Simulations, if conducted, shall be in...
14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).
Code of Federal Regulations, 2011 CFR
2011-01-01
... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...
14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).
Code of Federal Regulations, 2014 CFR
2014-01-01
... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...
14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).
Code of Federal Regulations, 2012 CFR
2012-01-01
... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...
14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).
Code of Federal Regulations, 2013 CFR
2013-01-01
... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Qualifications § 622.10 Sponsors. (a) Watershed projects are sponsored by one or more local organizations qualifying as sponsors. All watershed plans shall be sponsored...
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Qualifications § 622.10 Sponsors. (a) Watershed projects are sponsored by one or more local organizations qualifying as sponsors. All watershed plans shall be sponsored...
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Qualifications § 622.10 Sponsors. (a) Watershed projects are sponsored by one or more local organizations qualifying as sponsors. All watershed plans shall be sponsored...
Code of Federal Regulations, 2014 CFR
2014-01-01
... AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Qualifications § 622.10 Sponsors. (a) Watershed projects are sponsored by one or more local organizations qualifying as sponsors. All watershed plans shall be sponsored...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... privileges accorded to small business concerns. Approval under the Defense Production Act does not confer...
48 CFR 209.570-1 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts... clause at 252.209-7007, Prohibited Financial Interests for Lead System Integrators. See PGI 209.570-1 for...
A Handbook of Flight Simulation Fidelity Required for Human Factors Research
DOT National Transportation Integrated Search
1995-12-01
This report examines relevant literature for guidelines relative to the use of : flight simulators, ranging from full mission to part-task trainers, in addition : to requirements for flight crew experience and qualifications. Both sets of : guideline...
This document is composed of a work plan and additional technical information which demonstrates the qualifications of Detox Industries, Inc. to conduct remediation of a PCB contaminated sludge at General Motors (GM) plant in New York. Provided are the results of a field demons...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... Nonattainment and Maintenance Areas and Utah and Weber Counties: Gasoline Transfer and Storage;'' R307-335...: Qualification of Contractors and Test Procedures for Vapor Recovery Systems for Gasoline Delivery Tanks.'' This... Counties: Gasoline Transfer and Storage; Rule R307-335, Ozone Nonattainment and [[Page 59249
NASA Technical Reports Server (NTRS)
Bottenberg, W. R.
1981-01-01
The updated program plan and narrative reflects the design and development work done and progress made in establishing a viable design for these modules. Design alterations from the preproduction plan are discussed based on experience gained during the preproduction phase of the program.
7 CFR 3560.57 - Designated places for section 515 housing.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Plan or similar state plan or needs assessment report, (B) Indian reservations or communities located... having the greatest need for multifamily housing based on the following factors: (1) Qualification as a rural area as defined in § 3560.11, (2) Lack of mortgage credit, and (3) Demonstrated need for MFH based...
7 CFR 3560.57 - Designated places for section 515 housing.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Plan or similar state plan or needs assessment report, (B) Indian reservations or communities located... having the greatest need for multifamily housing based on the following factors: (1) Qualification as a rural area as defined in § 3560.11, (2) Lack of mortgage credit, and (3) Demonstrated need for MFH based...
7 CFR 3560.57 - Designated places for section 515 housing.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Plan or similar state plan or needs assessment report, (B) Indian reservations or communities located... having the greatest need for multifamily housing based on the following factors: (1) Qualification as a rural area as defined in § 3560.11, (2) Lack of mortgage credit, and (3) Demonstrated need for MFH based...
7 CFR 3560.57 - Designated places for section 515 housing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Plan or similar state plan or needs assessment report, (B) Indian reservations or communities located... having the greatest need for multifamily housing based on the following factors: (1) Qualification as a rural area as defined in § 3560.11, (2) Lack of mortgage credit, and (3) Demonstrated need for MFH based...
DOT National Transportation Integrated Search
2009-11-06
The objectives of this study are to pre-test analyze a decommissioned RC bridge that is selected in consultation : with New York State Department of Transportation (NYSDOT), and design and plan the field tests of the bridge : for the performance qual...
A Model for Talent Management and Career Planning
ERIC Educational Resources Information Center
Waheed, Sajjad; Zaim, A. Halim
2015-01-01
This paper discusses a talent management and career planning system designed based on the performance and qualifications of a group of interns working for an emerging social media company located in Istanbul. The proposed model is dynamic, comparative, and perceptional in constructing a talent pool for an organization. This system was developed…
Shuttle/Agena study. Volume 2, part 3: Preliminary test plans
NASA Technical Reports Server (NTRS)
1972-01-01
Proposed testing for the Agena tug program is based upon best estimates of shuttle and Agena tug requirements and upon the Agena configuration currently envisioned to meet these requirements. The proposed tests are presented in development, qualification, system, and launch base test plans. These plans are based upon generalized requirements and assumed situations. The limitations of this study precluded all but minimal consideration of related shuttle orbiter and shuttle ground systems. The test plans include provisions for all testing from major component to systems level, identified as necessary to aid in confirmation of the modified Agena configuration for the space tug; considerations that crew safety requirements and new environmental conditions from shuttle interface effects do impose some new Agena testing requirements; considerations that many existing Agena flight-qualified components will be utilized and qualification testing will be minimal; testing not only for the Agena tug but also for new or modified items of handling or servicing equipment for supporting the Agena factory-to-launch sequence; and the assembly of required testing into a sequence-ordered series of events.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of... performance to be in the best interest of the Federal government. (b) The HCA is designated as the official to...
48 CFR 1509.505-4 - Obtaining access to proprietary information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.505-4 Obtaining access to proprietary information. Contractors gaining access to confidential business... business information. ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1309.407-1 General... forth in CAM 1301.70 states in writing compelling reasons for continuing to do business with a suspended...
48 CFR 1409.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.405 Effect of listing. When a CO finds that a compelling reason exists to conduct business with a contractor listed on...
Effects of Rifle Handling, Target Acquisition, and Trigger Control on Simulated Shooting Performance
2014-05-06
qualification task, and covers all of the training requirements listed in the Soldier’s Manual of Common Tasks: Warrior Skills Level 1 handbook...allow for more direct and standardized training based on common Soldier errors. If discernible patterns in these core elements of marksmanship were...more than 50 percent of variance in marksmanship performance on a standard EST weapons qualification task for participants whose 3 Snellen acuity
A Chip and Pixel Qualification Methodology on Imaging Sensors
NASA Technical Reports Server (NTRS)
Chen, Yuan; Guertin, Steven M.; Petkov, Mihail; Nguyen, Duc N.; Novak, Frank
2004-01-01
This paper presents a qualification methodology on imaging sensors. In addition to overall chip reliability characterization based on sensor s overall figure of merit, such as Dark Rate, Linearity, Dark Current Non-Uniformity, Fixed Pattern Noise and Photon Response Non-Uniformity, a simulation technique is proposed and used to project pixel reliability. The projected pixel reliability is directly related to imaging quality and provides additional sensor reliability information and performance control.
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
40 CFR 62.14610 - How do I maintain my operator qualification?
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... startup and shutdown procedures, waste charging, and ash handling. (c) Inspection and maintenance. (d...
40 CFR 62.14610 - How do I maintain my operator qualification?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That... startup and shutdown procedures, waste charging, and ash handling. (c) Inspection and maintenance. (d...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-06-08
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-10-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FB SR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-S.2.1-20 1 0-00 1, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, 'Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.'« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DUNCAN JB; HUBER HJ
2011-04-21
This report documents the preparation of three actual Hanford tank waste samples for shipment to the Savannah River National Laboratory (SRNL). Two of the samples were dissolved saltcakes from tank 241-AN-103 (hereafter AN-103) and tank 241-SX-105 (hereafter SX-105); one sample was a supernate composite from tanks 241-AZ-101 and 241-AZ-102 (hereafter AZ-101/102). The preparation of the samples was executed following the test plans LAB-PLAN-10-00006, Test Plan for the Preparation of Samples from Hanford Tanks 241-SX-105, 241-AN-103, 241-AN-107, and LAB-PLN-l0-00014, Test Plan for the Preparation of a Composite Sample from Hanford Tanks 241-AZ-101 and 241-AZ-102 for Steam Reformer Testing at the Savannahmore » River National Laboratory. All procedural steps were recorded in laboratory notebook HNF-N-274 3. Sample breakdown diagrams for AN-103 and SX-105 are presented in Appendix A. The tank samples were prepared in support of a series of treatability studies of the Fluidized Bed Steam Reforming (FBSR) process using a Bench-Scale Reformer (BSR) at SRNL. Tests with simulants have shown that the FBSR mineralized waste form is comparable to low-activity waste glass with respect to environmental durability (WSRC-STI-2008-00268, Mineralization of Radioactive Wastes by Fluidized Bed Steam Reforming (FBSR): Comparisons to Vitreous Waste Forms and Pertinent Durability Testing). However, a rigorous assessment requires long-term performance data from FBSR product formed from actual Hanford tank waste. Washington River Protection Solutions, LLC (WRPS) has initiated a Waste Form Qualification Program (WP-5.2.1-2010-001, Fluidized Bed Steam Reformer Low-level Waste Form Qualification) to gather the data required to demonstrate that an adequate FBSR mineralized waste form can be produced. The documentation of the selection process of the three tank samples has been separately reported in RPP-48824, Sample Selection Process for Bench-Scale Steam Reforming Treatability Studies Using Hanford Waste Samples.« less
Code of Federal Regulations, 2011 CFR
2011-04-01
.../applicability date provisions. (3) Special rules for certain plans—(i) New plans. The limitations described in... with the opportunity to make a new election under which the form of benefit previously elected is modified, subject to applicable qualification requirements. A participant who makes such a new election is...
Code of Federal Regulations, 2012 CFR
2012-04-01
.../applicability date provisions. (3) Special rules for certain plans—(i) New plans. The limitations described in... with the opportunity to make a new election under which the form of benefit previously elected is modified, subject to applicable qualification requirements. A participant who makes such a new election is...
Code of Federal Regulations, 2014 CFR
2014-04-01
.../applicability date provisions. (3) Special rules for certain plans—(i) New plans. The limitations described in... with the opportunity to make a new election under which the form of benefit previously elected is modified, subject to applicable qualification requirements. A participant who makes such a new election is...
40 CFR 112.12 - Spill Prevention, Control, and Countermeasure Plan requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Fish and Marine Mammal Oils; and for Vegetable Oils, including Oils from Seeds, Nuts, Fruits, and... with industry standards, the appropriate qualifications for personnel performing tests and inspections...
Liquid Secondary Waste Grout Formulation and Waste Form Qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Um, Wooyong; Williams, B. D.; Snyder, Michelle M. V.
This report describes the results from liquid secondary waste (LSW) grout formulation and waste form qualification tests performed at Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions (WRPS) to evaluate new formulations for preparing a grout waste form with high-sulfate secondary waste simulants and the release of key constituents from these grout monoliths. Specific objectives of the LSW grout formulation and waste form qualification tests described in this report focused on five activities: 1.preparing new formulations for the LSW grout waste form with high-sulfate LSW simulants and solid characterization of the cured LSW grout waste form; 2.conducting themore » U.S. Environmental Protection Agency (EPA) Method 1313 leach test (EPA 2012) on the grout prepared with the new formulations, which solidify sulfate-rich Hanford Tank Waste Treatment and Immobilization Plant (WTP) off-gas condensate secondary waste simulant, using deionized water (DIW); 3.conducting the EPA Method 1315 leach tests (EPA 2013) on the grout monoliths made with the new dry blend formulations and three LSW simulants (242-A evaporator condensate, Environmental Restoration Disposal Facility (ERDF) leachate, and WTP off-gas condensate) using two leachants, DIW and simulated Hanford Integrated Disposal Facility (IDF) Site vadose zone pore water (VZPW); 4.estimating the 99Tc desorption K d (distribution coefficient) values for 99Tc transport in oxidizing conditions to support the IDF performance assessment (PA); 5.estimating the solubility of 99Tc(IV)-bearing solid phases for 99Tc transport in reducing conditions to support the IDF PA.« less
29 CFR 549.1 - Essential requirements for qualifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... their views either orally or in writing, that it is in accord with the meaning and intent of the... the occurrence of appropriate contingencies specified in the plan or trust: Provided, however, That...
40 CFR 62.14600 - When must the operator training course be completed?
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Operator Training and Qualification § 62.14600 When...
40 CFR 62.14625 - What if all the qualified operators are temporarily not accessible?
Code of Federal Regulations, 2013 CFR
2013-07-01
... FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Operator Training and Qualification...
48 CFR 2009.570 - NRC organizational conflicts of interest.
Code of Federal Regulations, 2010 CFR
2010-10-01
... conflicts of interest. 2009.570 Section 2009.570 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570 NRC organizational conflicts of interest. ...
Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2
NASA Technical Reports Server (NTRS)
Ziemke, Robert A.
2012-01-01
In June 2011, the multi-university sponsored Cosmic Ray Electron Synchrotron Telescope (CREST) has undergone thermal-vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the B-2 Space Propulsion Facility vacuum chamber. The CREST was later flown over the Antarctic region as the payload of a stratospheric balloon. Solar simulation was provided by a system of planar infrared lamp arrays specifically designed for CREST. The lamp arrays, in conjunction with a liquid-nitrogen-cooled cold wall, achieved the required thermal conditions for the qualification tests. The following slides accompanied the presentation of the report entitled Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2, at the 27th Aerospace Testing Seminar, October 2012. The presentation described the test article, the test facility capability, the solar simulation requirements, the highlights of the engineering approach, and the results achieved. The presentation was intended to generate interest in the report and in the B-2 test facility.
NASA Technical Reports Server (NTRS)
Slafer, Loren I.
1989-01-01
Realtime simulation and hardware-in-the-loop testing is being used extensively in all phases of the design, development, and testing of the attitude control system (ACS) for the new Hughes HS601 satellite bus. Realtime, hardware-in-the-loop simulation, integrated with traditional analysis and pure simulation activities is shown to provide a highly efficient and productive overall development program. Implementation of high fidelity simulations of the satellite dynamics and control system algorithms, capable of real-time execution (using applied Dynamics International's System 100), provides a tool which is capable of being integrated with the critical flight microprocessor to create a mixed simulation test (MST). The MST creates a highly accurate, detailed simulated on-orbit test environment, capable of open and closed loop ACS testing, in which the ACS design can be validated. The MST is shown to provide a valuable extension of traditional test methods. A description of the MST configuration is presented, including the spacecraft dynamics simulation model, sensor and actuator emulators, and the test support system. Overall system performance parameters are presented. MST applications are discussed; supporting ACS design, developing on-orbit system performance predictions, flight software development and qualification testing (augmenting the traditional software-based testing), mission planning, and a cost-effective subsystem-level acceptance test. The MST is shown to provide an ideal tool in which the ACS designer can fly the spacecraft on the ground.
NASA Technical Reports Server (NTRS)
Wilkenfeld, J. M.; Harlacher, B. L.; Mathews, D.
1982-01-01
A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. A review and critical evaluation of possible approaches to qualify spacecraft against space electron-induced discharges (EID) is presented. A variety of possible schemes to simulate EID electromagnetic effects produced in spacecraft was studied. These techniques form the principal element of a provisional, recommended set of test procedures for the EID qualification spacecraft. Significant gaps in our knowledge about EID which impact the final specification of an electrical test to qualify spacecraft against EID are also identified.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Raimondo, E.; Capman, J.L.; Herovard, M.
1985-05-01
Requirements for qualification of electrical equipment used in French-built nuclear power plants are stated in a national code, the RCC-E, or Regles de Construction et de Conception des Materiels Electriques. Under the RCC-E, safety related equipment is assigned to one of three different categories, according to location in the plant and anticipated normal, accident and post-accident behavior. Qualification tests differ for each category and procedures range in scope from the standard seismic test to the highly stringent VISA program, which specifies a predetermined sequence of aging, radiation, seismic and simulated accident testing. A network of official French test facilities wasmore » developed specifically to meet RCC-E requirements.« less
2017-04-28_B61-12-Program Overview(OUO).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniels, Vonceil
2017-04-01
The B61-12 LEP is currently executing Phase 6.4 Production Engineering with a focus on qualification and preproduction activities. All major milestones have been successfully completed to date. Component Final Design Reviews (FDRs) continue in FY17, with 19 of 38 complete as of April 28. A series of normal and abnormal environments tests occurred in the first half of FY17, and the first qualification flight test on an F-16 was executed in March. Two F-15 qualification flight tests are planned in August. To support Pantex readiness, the first all-up-round (AUR) trainer builds were completed in December 2016. Progress is ongoing towardmore » closure of Air Force Nuclear Weapons Center (tailkit) and Los Alamos National Laboratory interface gaps, and resolution of producibility challenges with the Kansas City National Security Campus (KCNSC).« less
Solar Simulation for the CREST Preflight Thermal-Vacuum Test at B-2
NASA Technical Reports Server (NTRS)
Ziemke, Robert A.
2013-01-01
In June 2011, the multi-university sponsored Cosmic Ray Electron Synchrotron Telescope (CREST) has undergone thermal-vacuum qualification testing at the NASA Glenn Research Center (GRC), Plum Brook Station, Sandusky, Ohio. The testing was performed in the B- 2 Space Propulsion Facility vacuum chamber. The CREST was later flown over the Antarctic region as the payload of a stratospheric balloon. Solar simulation was provided by a system of planar infrared lamp arrays specifically designed for CREST. The lamp arrays, in conjunction with a liquid-nitrogen-cooled cryoshroud, achieved the required thermal conditions for the qualification tests. This report focuses on the design and analysis of the planar arrays based on first principles. Computational spreadsheets are included in the report.
14 CFR 142.11 - Application for issuance or amendment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... flight simulator or flight training device, the make, model, and series of airplane or the set of... simulator and flight training device subject to qualification evaluation by the Administrator, the... Flight Standards District Office that has jurisdiction over the area in which the applicant's principal...
14 CFR 142.11 - Application for issuance or amendment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... flight simulator or flight training device, the make, model, and series of airplane or the set of... simulator and flight training device subject to qualification evaluation by the Administrator, the... Flight Standards District Office that has jurisdiction over the area in which the applicant's principal...
14 CFR 142.11 - Application for issuance or amendment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... flight simulator or flight training device, the make, model, and series of airplane or the set of... simulator and flight training device subject to qualification evaluation by the Administrator, the... Flight Standards District Office that has jurisdiction over the area in which the applicant's principal...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy. 1609.7101 Section 1609.7101 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Performance...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy. 1609.7101 Section 1609.7101 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Performance...
30 CFR 75.156 - AMS operator, qualifications.
Code of Federal Regulations, 2010 CFR
2010-07-01
... training on duties and responsibilities at each mine where an AMS operator is employed in accordance with the mine operator's approved Part 48 training plan. (b) An AMS operator must be able to demonstrate to...
48 CFR 3009.108-7005 - Clause.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...
48 CFR 3009.108-7005 - Clause.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...
48 CFR 3009.108-7005 - Clause.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...
48 CFR 3009.108-7005 - Clause.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...
48 CFR 3009.108-7005 - Clause.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 3009.108-7005 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible... Contracts with Corporate Expatriates, in all solicitations and contracts. [71 FR 25769, May 2, 2006...
Individualized Education Plans (IEPs) (For Parents)
... in a special way, for reasons such as: learning disabilities attention deficit hyperactivity disorder (ADHD) emotional disorders cognitive ... the child would be tested for a specific learning disability or other impairment to help determine qualification for ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 1509.170-2 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-2 Purpose. This subpart provides guidance to program and contracting personnel regarding the evaluation of contractor performance. It...
ERIC Educational Resources Information Center
Sun, Guodong
2011-01-01
The cultivation target of physical education major in normal universities is mainly physical teachers' qualification in basic education. Training of teaching-plan-telling on students of sports teaching major in normal universities has significant meaning to enhance the quality of students in a comprehensive way, realize the target of professional…
Qualification test results for DOE solar photovoltaic flat panel procurement - PRDA 38
NASA Technical Reports Server (NTRS)
Griffith, J. S.
1980-01-01
Twelve types of prototypes modules for the DOE Photovoltaic Flat Panel Procurement (PRDA 38) were subjected to qualification tests at the Jet Propulsion Laboratory according to a new specification. Environmental exposures were carried out separately and included temperature cycling, humidity, wind simulation, and hail. The most serious problems discovered were reduced insulation resistance to ground and ground continuity of the metal frames, electrical degradation, erratic power readings, and delamination. The electrical and physical characteristics of the newly received modules are also given.
Helicopter simulator qualification
NASA Technical Reports Server (NTRS)
Hampson, Brian
1992-01-01
CAE has extensive experience in building helicopter simulators and has participated in group working sessions for fixed-wing advisory circulars. Against this background, issues that should be addressed in establishing helicopter approval criteria were highlighted. Some of these issues are not immediately obvious and may, indeed, be more important than the criteria a themselves.
NASA Technical Reports Server (NTRS)
Duke, Eugene L.; Hewett, Marle D.; Brumbaugh, Randal W.; Tartt, David M.; Antoniewicz, Robert F.; Agarwal, Arvind K.
1988-01-01
An automated flight test management system (ATMS) and its use to develop a rapid-prototyping flight research facility for artificial intelligence (AI) based flight systems concepts are described. The ATMS provides a flight test engineer with a set of tools that assist in flight planning and simulation. This system will be capable of controlling an aircraft during the flight test by performing closed-loop guidance functions, range management, and maneuver-quality monitoring. The rapid-prototyping flight research facility is being developed at the Dryden Flight Research Facility of the NASA Ames Research Center (Ames-Dryden) to provide early flight assessment of emerging AI technology. The facility is being developed as one element of the aircraft automation program which focuses on the qualification and validation of embedded real-time AI-based systems.
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
48 CFR 9.106 - Preaward surveys.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Preaward surveys. 9.106 Section 9.106 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.106 Preaward surveys. ...
24 CFR 92.254 - Qualification as affordable housing: Homeownership.
Code of Federal Regulations, 2010 CFR
2010-04-01
... revitalization strategy under § 91.215(e)(2) of its consolidated plan or Empowerment Zone or Enterprise Community... owner-occupied unit would not be subject to the income targeting or affordability provisions of § 92.254...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Policy. 2809.402 Section 2809.402 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Competition and Acquisition Planning CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2809.402 Policy. Contracting...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2809.402 Section 2809.402 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2809.402 Policy. Contracting...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2809.402 Section 2809.402 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2809.402 Policy. Contracting...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false General. 3009.171-1 Section 3009.171-1 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible...
48 CFR 2009.570-4 - Representation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... type required by the organizational conflicts of interest representation provisions has previously been... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-4 Representation... whether situations or relationships exist which may constitute organizational conflicts of interest with...
48 CFR 2509.403 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Definitions. 2509.403 Section 2509.403 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2509.403 Definitions. The NSF Deputy...
48 CFR 1609.471 - Contractor certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...
48 CFR 3409.502 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Applicability. 3409.502 Section 3409.502 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 3409.502...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Waiver. 3409.503 Section 3409.503 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 3409.503...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procedures. 3409.507 Section 3409.507 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 3409.507...
48 CFR 3409.570 - Offeror certification provision.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Offeror certification provision. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Debarment. 3409.406 Section 3409.406 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 3409...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false [Reserved] 3409.403 Section 3409.403 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 3409...
48 CFR 1509.170-1 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-1 Section 1509.170-1 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-1 Scope of subpart. This subpart establishes EPA policy and procedures for evaluation of contractor performance...
NASA Technical Reports Server (NTRS)
Valdez, A.
1999-01-01
This document contains the procedure and the test results of the Advanced Microwave Sounding Unit-A (AMSU-A) Electromagnetic Interference (EMI), Electromagnetic Susceptibility, and Electromagnetic Compatibility (EMC) qualification test for the Meteorological Satellite (METSAT) and the Meteorological Operation Platform (METOP) projects. The test was conducted in accordance with the approved EMI/EMC Test Plan/Procedure, Specification number AE-26151/5D. This document describes the EMI/EMC test performed by Aerojet and it is presented in the following manner: Section-1 contains introductory material and a brief summary of the test results. Section 2 contains more detailed descriptions of the test plan, test procedure, and test results for each type of EMI/EMC test conducted. Section 3 contains supplementary information that includes test data sheets, plots, and calculations collected during the qualification testing.
Nøhr, C; Bygholm, A; Hejlesen, O
1998-06-01
Education is essentially giving people new skills and qualifications to fulfil certain tasks. In planning and managing educational programmes it is crucial to know what skills and what qualifications are needed to carry out the tasks in question, not to mention the importance of knowing what tasks are relevant to carry out. The programme in health informatics at Aalborg University produces health informatics professionals. The students are developing skills in solving informatics problems in health care organisations. The programme has been running for 3 years now and to maintain the perception of the aim for the programme a number of activities have been launched. In the following, the programme will be presented, the activities to obtain information on how to keep the programme targeted and updated will be described and the changes that are going to be introduced will be outlined.
Mechanisms of microregulation of private hospitals by health plan operators.
Ugá, Maria Alicia Domínguez; Vasconcellos, Miguel Murat; Lima, Sheyla Maria Lemos; Portela, Margareth Crisóstomo; Gerschman, Silvia
2009-10-01
To analyze the mechanisms employed by health plan operators for microregulation of clinical management and health care qualification within care-providing hospitals. A nation-wide cross-sectional study was carried out. The universe consisted of hospitals which provided care to health plan operators in 2006. A sample of 83 units was selected, stratified by Brazilian macroregion and type of hospital. Data were obtained by means of a questionnaire administered to hospital managers. Microregulation of hospitals by health plan operators was minimal or almost absent in terms of health care qualification. Operator activity focused predominantly on intense control of the amount of services used by patients. Hospitals providing services to health plan operators did not constitute health micro-systems parallel or supplementary to the Sistema Unico de Saúde (SUS - Brazilian National Health System). The private care-providing hospitals were predominantly associated with SUS. However, these did not belong to a private care-provider network, even though their service usage was subject to strong regulation by health plan operators. Operator intervention in the form of system management was incipient or virtually absent. Roughly one-half of investigated hospitals reported adopting clinical directives, whereas only 25.4% reported managing pathology and 30.5% reported managing cases. Contractual relationships between hospitals and health plan operators are merely commercial contracts with little if any incorporation of aspects related to the quality of care, being generally limited to aspects such as establishment of prices, timeframes, and payment procedures.
Automated personnel data base system specifications, Task V. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartley, H.J.; Bocast, A.K.; Deppner, F.O.
1978-11-01
The full title of this study is 'Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirements Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.
Hsu, Li-Ling; Chang, Wen-Hui; Hsieh, Suh-Ing
2015-01-01
Studies have shown that an underappreciation of the importance of person-centered communication and inappropriate communication training could result in unsatisfactory communication performance from nurses. There are a large number of studies about communication training for nurses, but not so many about communication training in early stages of nursing career. The purpose of this study is to compare the effect of a traditional course versus scenario-based simulation training on nurses' communication competency, communication self-efficacy, and communication performance in discharge planning Objective Structured Clinical Examination (OSCE). A randomized controlled trial was used with a pretest and two posttests. The experimental group underwent the scenario-based simulation course, whereas the control group received the traditional course. A convenience sample of 116 nurses with qualifications ranging from N0 level (novice nurses) to N2 level (competent nurses) in Taiwan's clinical nursing ladder system was recruited from a medical center in northern Taiwan. Analysis of covariance was used to determine between-subjects effects on communication competency and self-efficacy, whereas independent t test and Mann-Whitney U test were used to examine between-subjects effects on learner satisfaction and discharge planning communication performance. Paired t test was used to determine communication self-efficacy. In this study, the nurses and independent raters found scenario-based simulation training more effective than traditional communication course. However, standardized patients reported no significant difference in communication performance between the two groups of nurses. Despite that traditional classroom lectures and simulation-based communication training could both produce enhanced communication competency and self-efficacy among nurses, this study has established that the latter may be better than the former in terms of learner satisfaction and communication performance improvement. Therefore, introduction of simulation-based training to in-service nursing education could enhance nurses' communication performance in clinical practice. Copyright © 2015 Elsevier Inc. All rights reserved.
76 FR 29335 - Qualification, Service, and Use of Crewmembers and Aircraft Dispatchers
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
...On January 12, 2009, the FAA published a notice of proposed rulemaking on qualification, service, and use of crewmembers and aircraft dispatchers. Because of the complexity of the issues and the concerns raised by commenters, the FAA is issuing this supplemental notice of proposed rulemaking. The FAA proposes to amend the regulations for crewmember and aircraft dispatcher training programs in domestic, flag, and supplemental operations. The proposed regulations enhance traditional training programs by requiring the use of flight simulation training devices for flightcrew members and including additional training and evaluation requirements for all crewmembers and aircraft dispatchers in areas that are critical to safety. The proposal also reorganizes and revises the qualification, training, and evaluation requirements. The proposed changes are intended to contribute significantly to reducing aviation accidents.
Space qualification of silicon carbide for mirror applications: progress and future objectives
NASA Astrophysics Data System (ADS)
Palusinski, Iwona A.; Ghozeil, Isaac
2006-09-01
Production of optical silicon carbide (SiC) for mirror applications continues to evolve and there are renewed plans to use this material in future space-based systems. While SiC has the potential for rapid and cost-effective manufacturing of large, lightweight, athermal optical systems, this material's use in mirror applications is relatively new and has limited flight heritage. This combination of drivers stresses the necessity for a space qualification program for this material. Successful space qualification will require independent collaboration to absorb the high cost of executing this program while taking advantage of each contributing group's laboratory expertise to develop a comprehensive SiC database. This paper provides an overview of the trends and progress in the production of SiC, and identifies future objectives such as non-destructive evaluation and space-effects modeling to ensure proper implementation of this material into future space-based systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Building simulations are increasingly used in various applications related to energy efficient buildings. For individual buildings, applications include: design of new buildings, prediction of retrofit savings, ratings, performance path code compliance and qualification for incentives. Beyond individual building applications, larger scale applications (across the stock of buildings at various scales: national, regional and state) include: codes and standards development, utility program design, regional/state planning, and technology assessments. For these sorts of applications, a set of representative buildings are typically simulated to predict performance of the entire population of buildings. Focusing on the U.S. single-family residential building stock, this paper willmore » describe how multiple data sources for building characteristics are combined into a highly-granular database that preserves the important interdependencies of the characteristics. We will present the sampling technique used to generate a representative set of thousands (up to hundreds of thousands) of building models. We will also present results of detailed calibrations against building stock consumption data.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Procedures. 2909.506 Section 2909.506 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 2909.506 Procedures. (a) If a...
48 CFR 1509.505-70 - Information sources.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Information sources. 1509... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interests 1509.505-70 Information sources. (a) Disclosure. Prospective EPA Contractors responding to solicitations or submitting unsolicited...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 9.701 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.701 Definition. Pool... order to obtain and perform, jointly or in conjunction with each other, defense production or research...
40 CFR 60.2630 - What should I include in my waste management plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management.... Model Rule—Operator Training and Qualification ...
40 CFR 60.2630 - What should I include in my waste management plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management.... Model Rule—Operator Training and Qualification ...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Policy. 9.103 Section 9.103 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 9.103 Policy. (a) Purchases shall be made from...
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant... took appropriate steps to prevent any organizational conflict of interest in the selection process; or... process over which the entity exercised no control. (c) CONSTRUCTION—Nothing in this section 3009.570...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Exceptions. 9.304 Section 9.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.304 Exceptions. Normally, testing and approval...
48 CFR 3009.570-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procedures. 3009.570-3 Section 3009.570-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and...
48 CFR 1509.170-3 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-3 Applicability. (a) This....604 provides detailed instructions for architect-engineer contractor performance evaluations. (b) The... simplified acquisition procedures do not require the creation or existence of a formal database for past...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Definition. 9.601 Section 9.601 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Team Arrangements 9.601 Definition. Contractor team arrangement, as used...
48 CFR 1509.170-8 - Contractor Performance Report.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...
48 CFR 3009.171-8 - Ineligible contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Ineligible contractors..., HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 3009.171-8 Ineligible contractors. Any business concern determined to be ineligible...
48 CFR 3409.406-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Procedures. 3409.406-3 Section 3409.406-3 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 3409...
Evaluation of the Effectiveness of Simulation for M4 Marksmanship Training
2014-02-01
DEMOGRAPHIC QUESTIONNAIRE ................................................. 34 APPENDIX C: ANALYSIS OF MARKSMANSHIP PERFORMANCE DATA TO IDENTIFY POTENTIAL...machine guns and anti- armour weapons. In these simulators, firers aim a modified weapon at a target image on a screen. When the firer pulls the trigger...investigate predictors of live-fire LF6 qualification. Specifically, we examined the utility of LF6 simulator scores and trainee demographic data as
14 CFR 121.921 - Training devices and simulators.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Advanced Qualification Program § 121.921 Training... provide for its serviceability and fitness to perform its intended function as approved by the FAA. ...
Components Qualification for a Possible use in the Mu2e Calorimeter Waveform Digitizer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Di Falco, S.; Donati, S.; Morescalchi, L.
2017-03-30
The Mu2e experiment at Fermilab searches for the charged flavor violating conversion of a muon into an electron in the Coulomb field of a nucleus. The detector consists of a straw tube tracker and a CSI crystal electromagnetic calorimeter, both housed in a superconducting solenoid. Both the front-end and the digital electronics, located inside the cryostat, will be operated in vacuum under a 1 T magnetic field, having to sustain the high flux of neutrons and ionizing particles coming from the muons stopping target. These harsh experimental conditions make the design of the calorimeter waveform digitizer quite challenging. All themore » selected commercial devices must be tested individually and qualified for radiation hardness and operation in high magnetic field. At the moment the expected particles flux and spectra at the digitizers location are not completely simulated and we are using initial rough estimates to select the components for the first prototype. We are gaining experience in the qualification procedures using the selected components but the choice will be frozen only when dose and neutron flux simulations will be completed. The experimental results of the first qualification campaign are presented.« less
14 CFR 91.1091 - Qualifications: Flight instructors (aircraft) and flight instructors (simulator).
Code of Federal Regulations, 2010 CFR
2010-01-01
... or 135 of this chapter; (2) Has satisfactorily completed the training phases for the aircraft... appropriate training phases for the aircraft, including recurrent training, that are required to serve as a... aircraft, in a flight simulator, or in a flight training device for a particular type, class, or category...
Simulation of Satellite Vibration Test
NASA Astrophysics Data System (ADS)
Bettacchioli, Alain
2014-06-01
During every mechanical qualification test of satellites on vibrator, we systematically notice beating phenomena that appear every time we cross a mode's frequency. There could lead to an over-qualification of the tested specimen when the beating reaches a maximum and a under-qualification when the beating passes by a minimum. On a satellite, three lateral modes raise such a problem in a recurring way: the first structure mode (between 10 and 15 hertz) and the two tanks modes (between 35 and 50 hertz).To step forward in the resolution of this problem, we are developing a simulator which is based on the identification of the responses of the accelerometers that are fixed on the satellite and on the shaker slip table. The estimated transfer functions then allow to reconstruct at once the sensors response and the drive which generated them.For the simulation, we do not select all the sensors but only those on the slip table and those used to limit the input level (notching). We may also add those which were close to generate a notching.To perform its calculations, the simulator reproduces on one hand the unity amplitude signal (cola) which serves as frequency reference for the sweep achievement (generally 3 octaves per minute from 5 to 100 and even 150 Hertz), and on the other hand, the vibrator control loop. The drive amplitude is calculated at each cola's period by taking into account a compression factor. The control applied through the amplifier to the shaker coil is the product of this amplitude by the cola. The simulated measurements are updated at each sampling period thanks to the propagation of the identified model. The superposition of these curves on those supplied by real sensors during the tests allows to validate the simulation.Thereby, it seems possible to actively control the beatings thanks to a real-time corrector which uses these identifications.
Improving reticle defect disposition via fully automated lithography simulation
NASA Astrophysics Data System (ADS)
Mann, Raunak; Goodman, Eliot; Lao, Keith; Ha, Steven; Vacca, Anthony; Fiekowsky, Peter; Fiekowsky, Dan
2016-03-01
Most advanced wafer fabs have embraced complex pattern decoration, which creates numerous challenges during in-fab reticle qualification. These optical proximity correction (OPC) techniques create assist features that tend to be very close in size and shape to the main patterns as seen in Figure 1. A small defect on an assist feature will most likely have little or no impact on the fidelity of the wafer image, whereas the same defect on a main feature could significantly decrease device functionality. In order to properly disposition these defects, reticle inspection technicians need an efficient method that automatically separates main from assist features and predicts the resulting defect impact on the wafer image. Analysis System (ADAS) defect simulation system[1]. Up until now, using ADAS simulation was limited to engineers due to the complexity of the settings that need to be manually entered in order to create an accurate result. A single error in entering one of these values can cause erroneous results, therefore full automation is necessary. In this study, we propose a new method where all needed simulation parameters are automatically loaded into ADAS. This is accomplished in two parts. First we have created a scanner parameter database that is automatically identified from mask product and level names. Second, we automatically determine the appropriate simulation printability threshold by using a new reference image (provided by the inspection tool) that contains a known measured value of the reticle critical dimension (CD). This new method automatically loads the correct scanner conditions, sets the appropriate simulation threshold, and automatically measures the percentage of CD change caused by the defect. This streamlines qualification and reduces the number of reticles being put on hold, waiting for engineer review. We also present data showing the consistency and reliability of the new method, along with the impact on the efficiency of in-fab reticle qualification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... organizational conflict of interest, then the contracting officer shall refer the documentation of the potential conflict and proposed resolution prepared in accordance with 7.105(b)(18) to the HCA for approval... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Waiver. 2909.503 Section 2909.503 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 2909.503 Waiver. (a) The Senior Procurement...
48 CFR 2009.570-4 - Representation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Representation. 2009.570-4 Section 2009.570-4 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-4 Representation...
Project #OMS-FY12-0006, February 15, 2012. The U.S. Environmental Protection Agency (EPA) Office of Inspector General plans to begin preliminary research for the subject project, which will be performed by a contractor.
48 CFR 909.504 - Contracting officer's responsibility.
Code of Federal Regulations, 2010 CFR
2010-10-01
... such firms for interests relating to a potential organizational conflict of interest in the performance... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 909.504... potential organizational conflict of interest and identify any actions that may be taken to avoid...
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1409.506 Procedures. If the CO determines that contractor performance of the contemplated work is likely to create an organizational conflict of interest, then the contracting officer shall refer the documentation of the potential...
48 CFR 909.504 - Contracting officer's responsibility.
Code of Federal Regulations, 2011 CFR
2011-10-01
... such firms for interests relating to a potential organizational conflict of interest in the performance... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 909.504... potential organizational conflict of interest and identify any actions that may be taken to avoid...
48 CFR 9.703 - Contracting with individual pool members.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...
48 CFR 9.703 - Contracting with individual pool members.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...
48 CFR 9.703 - Contracting with individual pool members.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...
48 CFR 9.703 - Contracting with individual pool members.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...
48 CFR 9.703 - Contracting with individual pool members.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracting with individual pool members. 9.703 Section 9.703 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and...
48 CFR 1509.170-4 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... each performance category. Ratings are defined as follows: 0 = unsatisfactory, 1 = poor, 2 = fair, 3... PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-4 Definitions. (a) Contractor Performance Report is an evaluation of a contractor's performance for a specified period of time...
48 CFR 1409.403 - Definitions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Definitions. 1409.403... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.403 Definitions... matters. The Office of Inspector General (OIG) may also refer actions. Conviction, for the purposes of...
48 CFR 1409.403 - Definitions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Definitions. 1409.403... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1409.403 Definitions... matters. The Office of Inspector General (OIG) may also refer actions. Conviction, for the purposes of...
48 CFR 2009.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Effect of listing. 2009.405 Section 2009.405 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2009.405 Effect of...
48 CFR 2509.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Effect of listing. 2509.405 Section 2509.405 Federal Acquisition Regulations System NATIONAL SCIENCE FOUNDATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2509.405 Effect of listing. ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... DEFENSE ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest... appropriate steps to prevent any organizational conflict of interest in the selection process; or (2) The... which the entity exercised no control. (c) In accordance with Section 802 of the National Defense...
48 CFR 9.307 - Government administration procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government administration... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.307 Government..., to the Government laboratory or other activity responsible for approval at the address specified in...
14 CFR 61.195 - Flight instructor limitations and qualifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... that flight instructor has determined the student's flight preparation, planning, equipment, and... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Flight instructor limitations and... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Flight...
10 CFR Appendix B to Subpart B of... - Training and Qualification for Security Skills and Knowledge
Code of Federal Regulations, 2012 CFR
2012-01-01
... maintain mandated certification, if applicable. Such personnel include, but are not limited to, flight... exercise shall be prepared for management review and planning and retained for a period of 1 year, unless a...
14 CFR 61.195 - Flight instructor limitations and qualifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... that flight instructor has determined the student's flight preparation, planning, equipment, and... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Flight instructor limitations and... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Flight...
10 CFR Appendix B to Subpart B of... - Training and Qualification for Security Skills and Knowledge
Code of Federal Regulations, 2011 CFR
2011-01-01
... maintain mandated certification, if applicable. Such personnel include, but are not limited to, flight... exercise shall be prepared for management review and planning and retained for a period of 1 year, unless a...
14 CFR 61.195 - Flight instructor limitations and qualifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... that flight instructor has determined the student's flight preparation, planning, equipment, and... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Flight instructor limitations and... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Flight...
10 CFR Appendix B to Subpart B of... - Training and Qualification for Security Skills and Knowledge
Code of Federal Regulations, 2013 CFR
2013-01-01
... maintain mandated certification, if applicable. Such personnel include, but are not limited to, flight... exercise shall be prepared for management review and planning and retained for a period of 1 year, unless a...
10 CFR Appendix B to Subpart B of... - Training and Qualification for Security Skills and Knowledge
Code of Federal Regulations, 2010 CFR
2010-01-01
... maintain mandated certification, if applicable. Such personnel include, but are not limited to, flight... exercise shall be prepared for management review and planning and retained for a period of 1 year, unless a...
14 CFR 61.195 - Flight instructor limitations and qualifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... that flight instructor has determined the student's flight preparation, planning, equipment, and... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Flight instructor limitations and... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Flight...
14 CFR 61.195 - Flight instructor limitations and qualifications.
Code of Federal Regulations, 2010 CFR
2010-01-01
... that flight instructor has determined the student's flight preparation, planning, equipment, and... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Flight instructor limitations and... TRANSPORTATION (CONTINUED) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Flight...
48 CFR 809.507-1 - Solicitation provisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 809.507-1 Solicitation provisions. (a) While conflicts of interest may not presently exist, award of certain types of contracts may create potential future organizational conflicts of interest (see...
48 CFR 2909.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Effect of listing. 2909.405 Section 2909.405 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2909.405 Effect of listing. (a...
48 CFR 1509.170-7 - Release of ratings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of... contacting the EPA contracting officer responsible for the evaluation. (b) Contractors' performance ratings... contract is located. Requests for past performance evaluations during the period the information may be...
48 CFR 1509.170-6 - Filing of forms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...
ERIC Educational Resources Information Center
Dallas Independent School District, TX. Dept. of Research, Evaluation, and Information Systems.
A guide to skilled occupations presents information on 30 occupations in narrative form. It is designed for students to use in career planning. For each occupation, the narrator describes, in conversational, first person form, the job, working conditions, necessary qualifications and personal characteristics, related school subjects, and…
48 CFR 9.307 - Government administration procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Government administration... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.307 Government..., to the Government laboratory or other activity responsible for approval at the address specified in...
Findings from the Supersonic Qualification Program of the Mars Science Laboratory Parachute System
NASA Technical Reports Server (NTRS)
Sengupta, Anita; Steltzner, Adam; Witkowski, Allen; Candler, Graham; Pantano, Carlos
2009-01-01
In 2012, the Mars Science Laboratory Mission (MSL) will deploy NASA's largest extra-terrestrial parachute, a technology integral to the safe landing of its advanced robotic explorer on the surface. The supersonic parachute system is a mortar deployed 21.5 m disk-gap-band (DGB) parachute, identical in geometric scaling to the Viking era DGB parachutes of the 1970's. The MSL parachute deployment conditions are Mach 2.3 at a dynamic pressure of 750 Pa. The Viking Balloon Launched Decelerator Test (BLDT) successfully demonstrated a maximum of 700 Pa at Mach 2.2 for a 16.1 m DGB parachute in its AV4 flight. All previous Mars deployments have derived their supersonic qualification from the Viking BLDT test series, preventing the need for full scale high altitude supersonic testing. The qualification programs for Mars Pathfinder, Mars Exploration Rover, and Phoenix Scout Missions were all limited to subsonic structural qualification, with supersonic performance and survivability bounded by the BLDT qualification. The MSL parachute, at the edge of the supersonic heritage deployment space and 33% larger than the Viking parachute, accepts a certain degree of risk without addressing the supersonic environment in which it will deploy. In addition, MSL will spend up to 10 seconds above Mach 1.5, an aerodynamic regime that is associated with a known parachute instability characterized by significant canopy projected area fluctuation and dynamic drag variation. This aerodynamic instability, referred to as "area oscillations" by the parachute community has drag performance, inflation stability, and structural implications, introducing risk to mission success if not quantified for the MSL parachute system. To minimize this risk and as an alternative to a prohibitively expensive high altitude test program, a multi-phase qualification program using computation simulation validated by subscale test was developed and implemented for MSL. The first phase consisted of 2% of fullscale supersonic wind tunnel testing of a rigid DGB parachute with entry-vehicle to validate two high fidelity computational fluid dynamics (CFD) tools. The computer codes utilized Large Eddy Simulation and Detached Eddy Simulation numerical approaches to accurately capture the turbulent wake of the entry vehicle and its coupling to the parachute bow-shock. The second phase was the development of fluid structure interaction (FSI) computational tools to predict parachute response to the supersonic flow field. The FSI development included the integration of the CFD from the first phase with a finite element structural model of the parachute membrane and cable elements. In this phase, a 4% of full-scale supersonic flexible parachute test program was conducted to provide validation data to the FSI code and an empirical dataset of the MSL parachute in a flight-like environment. The final phase is FSI simulations of the full-scale MSL parachute in a Mars type deployment. Findings from this program will be presented in terms of code development and validation, empirical findings from the supersonic testing, and drag performance during supersonic operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
MM Hall
2006-01-31
A major materials selection and qualification issue identified in the Space Materials Plan is the potential for creating materials compatibility problems by combining dissimilar reactor core, Brayton Unit and other power conversion plant materials in a recirculating, inert He/Xe gas loop containing reactive impurity gases. Reported here are results of equilibrium thermochemical analyses that address the compatibility of space nuclear power plant (SNPP) materials in high temperature impure He gas environments. These studies provide early information regarding the constraints that exist for SNPP materials selection and provide guidance for establishing test objectives and environments for SNPP materials qualification testing.
NASA Technical Reports Server (NTRS)
Valentine, Peter G.; Lawrence, Timothy W.; Gubert, Michael K.; Milos, Frank S.; Kiser, James D.; Ohlhorst, Craig W.; Koenig, John R.
2006-01-01
As a collaborative effort among NASA Centers, the "Lightweight Nonmetallic Thermal Protection Materials Technology" Project was set up to assist mission/vehicle design trade studies, to support risk reduction in thermal protection system (TPS) material selections, to facilitate vehicle mass optimization, and to aid development of human-rated TPS qualification and certification plans. Missions performing aerocapture, aerobraking, or direct aeroentry rely on advanced heatshields that allow reductions in spacecraft mass by minimizing propellant requirements. Information will be presented on candidate materials for such reentry approaches and on screening tests conducted (material property and space environmental effects tests) to evaluate viable candidates. Seventeen materials, in three classes (ablatives, tiles, and ceramic matrix composites), were studied. In additional to physical, mechanical, and thermal property tests, high heat flux laser tests and simulated-reentry oxidation tests were performed. Space environmental effects testing, which included exposures to electrons, atomic oxygen, and hypervelocity impacts, was also conducted.
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 809.106 - Pre-award surveys.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Pre-award surveys. 809.106 Section 809.106 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Responsible Prospective Contractors 809.106 Pre-award surveys. ...
48 CFR 9.505-4 - Obtaining access to proprietary information.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest... use or (2) available to the Government or contractor from other sources without restriction. (b) A... source selection information by acquiring the services of marketing consultants which, if used in...
48 CFR 3009.470-3 - Procedures.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...
48 CFR 3009.470-3 - Procedures.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...
48 CFR 3009.470-3 - Procedures.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...
48 CFR 3009.470-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...
48 CFR 3009.470-3 - Procedures.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 3009.470-3 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension... Administration (also see (FAR) 48 CFR 9.404 and 32 CFR part 216); and (b) The Department of Homeland Security— (1...
48 CFR 1309.507-2 - Contract clauses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1309.507-2... systems for which task orders may be issued and indicate which organizational conflict of interest... order which organizational conflict of interest provision in paragraph (a)(2) of this clause shall apply...
48 CFR 9.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Effect of listing. 9.405 Section 9.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 9.405 Effect of listing. (a) Contractors...
48 CFR 2809.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Effect of listing. 2809.405 Section 2809.405 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE Competition and Acquisition Planning CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 2809.405 Effect of listing. (a...
15 CFR 291.2 - Environmental integration projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... Applicants should specify plans for proper organization, staffing, and management of the implementation... managing organization to conduct the proposed activities; qualifications of the project team and its... solicitation is permitted in this category. (b) Project objective. The purpose of these projects is to support...
15 CFR 291.3 - Environmental tools and techniques projects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... demonstrated access to relevant technical or information sources external to the organization. (3) Degree of.... Applicants should specify plans for proper organization, staffing, and management of the implementation... managing organization to conduct the proposed activities; qualifications of the project team and its...
48 CFR 1309.507-2 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1309.507-2 Section 1309.507-2 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1309.507-2...
Separator Qualification for Aerospace Nickel-cadmium Cells
NASA Technical Reports Server (NTRS)
Milden, M. J.
1984-01-01
The development plans for a new separator for nickel cadmium (NiCd) cells is described. Research includes acceptance testing, operation in a charge/discharge characterization matrix, and life testing in low earth orbit (LEO) and geosynchronous (GEO) orbit under real time and accelerated conditions.
48 CFR 2009.570-7 - Conflicts identified after award.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Conflicts identified after... COMMISSION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-7 Conflicts identified after award. If potential organizational conflicts of interest are...
48 CFR 1309.507-2 - Contract clauses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Contract clauses. 1309.507-2 Section 1309.507-2 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1309.507-2...
48 CFR 1309.507-2 - Contract clauses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Contract clauses. 1309.507-2 Section 1309.507-2 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1309.507-2...
48 CFR 1309.507-2 - Contract clauses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Contract clauses. 1309.507-2 Section 1309.507-2 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 1309.507-2...
48 CFR 2009.570-5 - Contract clauses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-5 Contract clauses. (a) General contract clause. All contracts and simplified acquisitions of the types set forth in 2009.570-4(b) must include the clause entitled, “Contractor Organizational Conflicts of...
48 CFR 1509.170-7 - Release of ratings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Performance System will have direct access to all Reports, including those of EPA, in the National Institutes of Health's database. Information on EPA contractors' performance ratings may also be obtained by... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-7 Release of...
48 CFR 809.405 - Effect of listing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Effect of listing. 809.405 Section 809.405 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 809.405 Effect of...
Individual Characteristics and Unit Performance: A Review of Research and Methods
1985-02-01
behavioral segments, improves performance. Simu- lation exercises , especially those employing new high-technology devices, provide surrogate...high-technology training simulation exercise MOB Military Occupational Specialty ORTT Operational Readiness Training Test-a field test REALTRAIN A...REAListic TRAINing simulation exercise SAM Surface-to-Air Missile SAT Scholastic Aptitude Test SQT Skill Qualification Test-an Army performance meas
Validation of Commercial Fiber Optic Components for Aerospace Environments
NASA Technical Reports Server (NTRS)
Ott, Melanie N.
2005-01-01
Full qualification for commercial photonic parts as defined by the Military specification system in the past, is not feasible. Due to changes in the photonic components industry and the Military specification system that NASA had relied upon so heavily in the past, an approach to technology validation of commercial off the shelf parts had to be devised. This approach involves knowledge of system requirements, environmental requirements and failure modes of the particular components under consideration. Synthesizing the criteria together with the major known failure modes to formulate a test plan is an effective way of establishing knowledge based "qualification". Although this does not provide the type of reliability assurance that the Military specification system did in the past, it is an approach that allows for increased risk mitigation. The information presented will introduce the audience to the technology validation approach that is currently applied at NASA for the usage of commercial-off-the-shelf (COTS) fiber optic components for space flight environments. The focus will be on how to establish technology validation criteria for commercial fiber products such that continued reliable performance is assured under the harsh environmental conditions of typical missions. The goal of this presentation is to provide the audience with an approach to formulating a COTS qualification test plan for these devices. Examples from past NASA missions will be discussed.
2014-03-01
purpose of the study was to determine if the use of a simulator is at least as effective in marksmanship training as traditional dry fire techniques...determine if the use of a simulator is at least as effective in marksmanship training as traditional dry fire techniques. A between-groups study with a...marksmanship. Naval commands could use the information to effectively maintain gun qualifications for inport duty section watch bills and constant anti
14 CFR 60.5 - Quality management system.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.5 Quality... regular basis as described in QPS appendix E of this part. (b) The QMS program must provide a process for...
48 CFR 9.507-1 - Solicitation provisions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... conflicts of interest are normally resolved by imposing some restraint, appropriate to the nature of the... nature of the potential conflict as seen by the contracting officer; (c) States the nature of the... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 9.507-1...
40 CFR 60.2890 - How are these new source performance standards structured?
Code of Federal Regulations, 2010 CFR
2010-07-01
... standards structured? 60.2890 Section 60.2890 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... standards contain nine major components, as follows: (a) Preconstruction siting analysis. (b) Waste management plan. (c) Operator training and qualification. (d) Emission limitations and operating limits. (e...
48 CFR 9.505-2 - Preparing specifications or work statements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts... subcontractor, for a reasonable period of time including, at least, the duration of the initial production... eliminated for a reasonable time from competition for production based on the specifications. This should be...
48 CFR 9.505-2 - Preparing specifications or work statements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts... subcontractor, for a reasonable period of time including, at least, the duration of the initial production... eliminated for a reasonable time from competition for production based on the specifications. This should be...
ERIC Educational Resources Information Center
Further Education Unit, London (England).
This manual provides a comprehensive guide to college activities associated with the implementation of General National Vocational Qualifications (GNVQs) in Britain. Part A addresses GNVQ curriculum planning and management at the college level. This part includes the following sections: description of the context; questions that need to be…
10 CFR 603.515 - Qualification of a consortium.
Code of Federal Regulations, 2010 CFR
2010-01-01
... is not formally incorporated must provide a collaboration agreement, commonly referred to as the articles of collaboration, which sets out the rights and responsibilities of each consortium member. This... the consortium's collaboration agreement to ensure that the management plan is sound and that it...
10 CFR 603.515 - Qualification of a consortium.
Code of Federal Regulations, 2011 CFR
2011-01-01
... is not formally incorporated must provide a collaboration agreement, commonly referred to as the articles of collaboration, which sets out the rights and responsibilities of each consortium member. This... the consortium's collaboration agreement to ensure that the management plan is sound and that it...
48 CFR 2409.470 - HUD regulations on debarment, suspension, and ineligibility.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false HUD regulations on debarment, suspension, and ineligibility. 2409.470 Section 2409.470 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS...
48 CFR 2409.470 - HUD regulations on debarment, suspension, and ineligibility.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false HUD regulations on debarment, suspension, and ineligibility. 2409.470 Section 2409.470 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS...
42 CFR 65.5 - How will applications be evaluated?
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INTERNSHIPS, TRAINING NATIONAL INSTITUTE OF ENVIRONMENTAL HEALTH SCIENCES HAZARDOUS WASTE WORKER TRAINING § 65... pertinent factors, the significance of the project, the qualifications and competency of the project... selection criteria for trainees for the project, the adequacy of the detailed training plan including...
42 CFR 65.5 - How will applications be evaluated?
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INTERNSHIPS, TRAINING NATIONAL INSTITUTE OF ENVIRONMENTAL HEALTH SCIENCES HAZARDOUS WASTE WORKER TRAINING § 65... pertinent factors, the significance of the project, the qualifications and competency of the project... selection criteria for trainees for the project, the adequacy of the detailed training plan including...
48 CFR 1509.406-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 1509.406-3 Procedures. (a... who do not appear on the GSA Consolidated List; e.g., those who are ineligible based on a settlement...) Obtain the HCA's recommendation prior to reaching a voluntary exclusion settlement with a Contractor in...
48 CFR 3009.570-1 - Definitions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY ACQUISITION REGULATION (HSAR) ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant Conflicts of Interest 3009.570-1 Definitions. “Direct Financial Interest,” as used in this section, is defined in the clause at HSAR 48 CFR 3052.209-75, Prohibited Financial Interests for Lead System...
45 CFR 1151.18 - Illustrative examples.
Code of Federal Regulations, 2012 CFR
2012-10-01
... HUMANITIES NATIONAL ENDOWMENT FOR THE ARTS NONDISCRIMINATION ON THE BASIS OF HANDICAP Discrimination... persons are not subjected to discrimination on the basis of handicap either by sub-grantees or by the... handicapped person with experience and expertise equal to qualification standards established by a planning or...
45 CFR 1151.18 - Illustrative examples.
Code of Federal Regulations, 2013 CFR
2013-10-01
... HUMANITIES NATIONAL ENDOWMENT FOR THE ARTS NONDISCRIMINATION ON THE BASIS OF HANDICAP Discrimination... persons are not subjected to discrimination on the basis of handicap either by sub-grantees or by the... handicapped person with experience and expertise equal to qualification standards established by a planning or...
45 CFR 1151.18 - Illustrative examples.
Code of Federal Regulations, 2014 CFR
2014-10-01
... HUMANITIES NATIONAL ENDOWMENT FOR THE ARTS NONDISCRIMINATION ON THE BASIS OF HANDICAP Discrimination... persons are not subjected to discrimination on the basis of handicap either by sub-grantees or by the... handicapped person with experience and expertise equal to qualification standards established by a planning or...
45 CFR 1151.18 - Illustrative examples.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HUMANITIES NATIONAL ENDOWMENT FOR THE ARTS NONDISCRIMINATION ON THE BASIS OF HANDICAP Discrimination... persons are not subjected to discrimination on the basis of handicap either by sub-grantees or by the... handicapped person with experience and expertise equal to qualification standards established by a planning or...
45 CFR 1151.18 - Illustrative examples.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HUMANITIES NATIONAL ENDOWMENT FOR THE ARTS NONDISCRIMINATION ON THE BASIS OF HANDICAP Discrimination... persons are not subjected to discrimination on the basis of handicap either by sub-grantees or by the... handicapped person with experience and expertise equal to qualification standards established by a planning or...
40 CFR 62.14620 - What site-specific documentation is required?
Code of Federal Regulations, 2013 CFR
2013-07-01
... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Operator Training and Qualification § 62.14620 What...) Procedures for receiving, handling, and charging waste. (3) Incinerator startup, shutdown, and malfunction...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Nicholas R.; Pointer, William David; Sieger, Matt
2016-04-01
The goal of this review is to enable application of codes or software packages for safety assessment of advanced sodium-cooled fast reactor (SFR) designs. To address near-term programmatic needs, the authors have focused on two objectives. First, the authors have focused on identification of requirements for software QA that must be satisfied to enable the application of software to future safety analyses. Second, the authors have collected best practices applied by other code development teams to minimize cost and time of initial code qualification activities and to recommend a path to the stated goal.
Equivalent electron fluence for space qualification of shallow junction heteroface GaAs solar cells
NASA Technical Reports Server (NTRS)
Wilson, J. W.; Stock, L. V.
1984-01-01
It is desirable to perform qualification tests prior to deployment of solar cells in space power applications. Such test procedures are complicated by the complex mixture of differing radiation components in space which are difficult to simulate in ground test facilities. Although it has been shown that an equivalent electron fluence ratio cannot be uniquely defined for monoenergetic proton exposure of GaAs shallow junction cells, an equivalent electron fluence test can be defined for common spectral components of protons found in space. Equivalent electron fluence levels for the geosynchronous environment are presented.
NASA Astrophysics Data System (ADS)
Wright, M. W.; Wilkerson, M. W.; Tang, R. R.
2017-11-01
Qualification testing of fiber based laser transmitters is required for NASA's Deep Space Optical Communications program to mature the technology for space applications. In the absence of fully space qualified systems, commercial systems have been investigated in order to demonstrate the robustness of the technology. To this end, a 2.5 W fiber based laser source was developed as the transmitter for an optical communications experiment flown aboard the ISS as a part of a technology demonstration mission. The low cost system leveraged Mil Standard design principles and Telcordia certified components to the extent possible and was operated in a pressure vessel with active cooling. The laser was capable of high rate modulation but was limited by the mission requirements to 50 Mbps for downlinking stored video from the OPALS payload, externally mounted on the ISS. Environmental testing and space qualification of this unit will be discussed along with plans for a fully space qualified laser transmitter.
Metrication report to the Congress. 1991 activities and 1992 plans
NASA Technical Reports Server (NTRS)
1991-01-01
During 1991, NASA approved a revised metric use policy and developed a NASA Metric Transition Plan. This Plan targets the end of 1995 for completion of NASA's metric initiatives. This Plan also identifies future programs that NASA anticipates will use the metric system of measurement. Field installations began metric transition studies in 1991 and will complete them in 1992. Half of NASA's Space Shuttle payloads for 1991, and almost all such payloads for 1992, have some metric-based elements. In 1992, NASA will begin assessing requirements for space-quality piece parts fabricated to U.S. metric standards, leading to development and qualification of high priority parts.
48 CFR 2009.570-10 - Remedies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Remedies. 2009.570-10... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-10 Remedies. In addition to other remedies permitted by law or contract for a breach of the restrictions in this subpart or...
48 CFR 2009.570-10 - Remedies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Remedies. 2009.570-10... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 2009.570-10 Remedies. In addition to other remedies permitted by law or contract for a breach of the restrictions in this subpart or...
48 CFR 9.308-2 - Testing performed by the Government.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-2 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... purchase material or to commence production before first article approval, the contracting officer shall...
48 CFR 9.308-2 - Testing performed by the Government.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-2 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... purchase material or to commence production before first article approval, the contracting officer shall...
48 CFR 9.308-2 - Testing performed by the Government.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-2 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... purchase material or to commence production before first article approval, the contracting officer shall...
48 CFR 9.308-2 - Testing performed by the Government.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-2 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... purchase material or to commence production before first article approval, the contracting officer shall...
48 CFR 9.308-2 - Testing performed by the Government.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-2 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... purchase material or to commence production before first article approval, the contracting officer shall...
48 CFR 309.407-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procedures. 309.407-3 Section 309.407-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.407-3 Procedures. (a) Investigation and referral. When an...
48 CFR 409.407-3 - Procedures.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Procedures. 409.407-3 Section 409.407-3 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension and Ineligibility 409.407-3 Procedures. (a) Investigation and referral. When a...
48 CFR 9.702 - Contracting with pools.
Code of Federal Regulations, 2010 CFR
2010-10-01
... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... of a power of attorney identifying the agent authorized to sign the offer or contract on that member's behalf. The contracting officer shall attach a copy of each power of attorney to each signed copy...
5 CFR 534.404 - Setting and adjusting pay for senior executives.
Code of Federal Regulations, 2011 CFR
2011-01-01
... appointed senior executives who possess superior leadership or other competencies, as determined by the... things as unique skills, qualifications, or competencies that the individual possesses, and their... leadership or other competencies, as determined by the agency as part of its strategic human capital plan...
The Computerization of the National Library in Paris.
ERIC Educational Resources Information Center
Lerin, Christian; Bernard, Annick
1986-01-01
Describes the organization and automation plan of the Bibliotheque Nationale (Paris, France) that was begun in 1981. Highlights include the method of moving toward computerization; technical choices; the choosing procedure (pre-qualification, bench-mark test); short term and pilot operations; and preparation for the implementation of the…
49 CFR 193.2715 - Training: security.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Training: security. 193.2715 Section 193.2715...: FEDERAL SAFETY STANDARDS Personnel Qualifications and Training § 193.2715 Training: security. (a) Personnel responsible for security at an LNG plant must be trained in accordance with a written plan of...
49 CFR 193.2715 - Training: security.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Training: security. 193.2715 Section 193.2715...: FEDERAL SAFETY STANDARDS Personnel Qualifications and Training § 193.2715 Training: security. (a) Personnel responsible for security at an LNG plant must be trained in accordance with a written plan of...
49 CFR 193.2715 - Training: security.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Training: security. 193.2715 Section 193.2715...: FEDERAL SAFETY STANDARDS Personnel Qualifications and Training § 193.2715 Training: security. (a) Personnel responsible for security at an LNG plant must be trained in accordance with a written plan of...
Qualification Journey in Teacher Training: Case in Northern Cyprus
ERIC Educational Resources Information Center
Erden, Hale
2016-01-01
Problem Statement: The identification of professional teaching standards has great value on initial teacher training, hiring teachers, assessing teacher performance, as well as planning and organizing teacher professional development. In Northern Cyprus there are not any identified professional teaching standards. This study aimed at filling this…
NASA Astrophysics Data System (ADS)
Onea, A.; Hering, W.; Reiser, J.; Weisenburger, A.; Diez de los Rios Ramos, N.; Lux, M.; Ziegler, R.; Baumgärtner, S.; Stieglitz, R.
2017-07-01
Three classes of experimental liquid metal facilities have been completed during the LIMTECH project aiming the qualification of materials, investigation of thermoelectrical modules, investigation of sodium transitional regimes and fundamental thermo-dynamical flows in concentrating solar power (CSP) relevant geometries. ATEFA facility is dedicated to basic science investigation focussed on the alkali metal thermal-to-electric converter (AMTEC) technology. Three SOLTEC facilities are aimed to be used in different laboratories for long term material investigation sodium environment up to a 1000 K temperature and for long term tests of AMTEC modules. The medium scale integral facility KASOLA is planned as the backbone for CSP development and demonstration.
Combined Instrumentation Package COMARS+ for the ExoMars Schiaparelli Lander
NASA Astrophysics Data System (ADS)
Gülhan, Ali; Thiele, Thomas; Siebe, Frank; Kronen, Rolf
2018-02-01
In order to measure aerothermal parameters on the back cover of the ExoMars Schiaparelli lander the instrumentation package COMARS+ was developed by DLR. Consisting of three combined aerothermal sensors, one broadband radiometer sensor and an electronic box the payload provides important data for future missions. The aerothermal sensors called COMARS combine four discrete sensors measuring static pressure, total heat flux, temperature and radiative heat flux at two specific spectral bands. The infrared radiation in a broadband spectral range is measured by the separate broadband radiometer sensor. The electronic box of the payload is used for amplification, conditioning and multiplexing of the sensor signals. The design of the payload was mainly carried out using numerical tools including structural analyses, to simulate the main mechanical loads which occur during launch and stage separation, and thermal analyses to simulate the temperature environment during cruise phase and Mars entry. To validate the design an extensive qualification test campaign was conducted on a set of qualification models. The tests included vibration and shock tests to simulate launch loads and stage separation shocks. Thermal tests under vacuum condition were performed to simulate the thermal environment of the capsule during the different flight phases. Furthermore electromagnetic compatibility tests were conducted to check that the payload is compatible with the electromagnetic environment of the capsule and does not emit electromagnetic energy that could cause electromagnetic interference in other devices. For the sensor heads located on the ExoMars back cover radiation tests were carried out to verify their radiation hardness. Finally the bioburden reduction process was demonstrated on the qualification hardware to show the compliance with the planetary protection requirements. To test the actual heat flux, pressure and infrared radiation measurement under representative conditions, aerothermal tests were performed in an arc-heated wind tunnel facility. After all qualification tests were passed successfully, the acceptance test campaign for the flight hardware at acceptance level included the same tests than the qualification campaign except shock, radiation hardness and aerothermal tests. After passing all acceptance tests, the COMARS+ flight hardware was integrated into the Schiaparelli capsule in January 2015 at the ExoMars integration site at Thales Alenia Space in Turin. Although the landing of Schiaparelli failed, resulting in the loss of most COMARS+ flight data because they were stored on the lander, some data points were directly transmitted to the orbiter at low sampling rate during the entry phase. These data indicate that all COMARS+ sensors delivered useful data until parachute deployment with the exception of the plasma black-out phase. Since measured structure and sensor housing temperatures are far below predicted pre-flight values, a new calibration using COMARS+ spare sensors at temperatures below 0 °C is necessary.
Liquid secondary waste: Waste form formulation and qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cozzi, A. D.; Dixon, K. L.; Hill, K. A.
The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, including Direct Feed Low Activity Waste (DFLAW) vitrification, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. The powdered salt waste form produced by the ETF will be replaced by a stabilized solidified waste form for disposal in Hanford’s Integrated Disposal Facility (IDF). Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilizationmore » Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the IDF. Waste form testing to support this plan is composed of work in the near term to provide data as input to a performance assessment (PA) for Hanford’s IDF. In 2015, three Hanford Liquid Secondary Waste simulants were developed based on existing and projected waste streams. Using these waste simulants, fourteen mixes of Hanford Liquid Secondary Waste were prepared and tested varying the waste simulant, the water-to-dry materials ratio, and the dry materials blend composition.1 In FY16, testing was performed using a simulant of the EMF process condensate blended with the caustic scrubber—from the Low Activity Waste (LAW) melter—, processed through the ETF. The initial EMF-16 simulant will be based on modeling efforts performed to determine the mass balance of the ETF for the DFLAW.2 The compressive strength of all of the mixes exceeded the target of 3.4 MPa (500 psi) to meet the requirements identified as potential IDF Waste Acceptance Criteria in Table 1 of the Secondary Liquid Waste Immobilization Technology Development Plan.3 The hydraulic properties of the waste forms tested (hydraulic conductivity and water characteristic curves) were comparable to the properties measured on the Savannah River Site (SRS) Saltstone waste form. Future testing should include efforts to first; 1) determine the rate and amount of ammonia released during each unit operation of the treatment process to determine if additional ammonia management is required, then; 2) reduce the ammonia content of the ETF concentrated brine prior to solidification, making the waste more amenable to grouting, or 3) manage the release of ammonia during production and ongoing release during storage of the waste form, or 4) develop a lower pH process/waste form thereby precluding ammonia release.« less
Qualification of Bonding Process of Temperature Sensors to Extreme Temperature Deep Space Missions
NASA Technical Reports Server (NTRS)
Ramesham, Rajeshuni; Kitiyakara, Amarit; Redick, Richard; Sunada, Eric T.
2011-01-01
A process has been explored based on the state-of-the-art technology to bond the platinum resistance thermometer (PRT) on to potential aerospace material such as a flat aluminum surface and a flexible copper tube to simulate coaxial cable for the flight applications. Primarily, PRTs were inserted into a metal plated copper braid to avoid stresses on the sensor while attaching the sensor with braid to the base material for long duration deep space missions. Appropriate pretreatment has been implemented in this study to enhance the adhesion of the PRTs to the base material. NuSil product has been chosen in this research to attach PRT to the base materials. The resistance (approx.1.1 k(Omega)) of PRTs has been electrically monitored continuously during the qualification thermal cycling testing from -150 C to +120 C and -100 C to -35 C. The test hardware has been thermal cycled three times the mission life per JPL design principles for JUNO project. No PRT failures were observed during and after the PRT thermal cycling qualification test for extreme temperature environments. However, there were some failures associated with staking of the PRT pig tails as a result of thermal cycling qualification test.
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2014 CFR
2014-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2012 CFR
2012-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2013 CFR
2013-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
48 CFR 9.308-1 - Testing performed by the contractor.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 9.308-1 Testing performed by... produce the first article and the production quantity at the same facility, the contracting officer shall... material or to commence production before first article approval, the contracting officer shall use the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... shall identify classroom and field courses, lectures, tests, and other educational or instructional forums designed to ensure the proficiency, qualification, and familiarity with the operating rules and... shall identify the post-accident toxicological testing, reasonable cause testing, and random alcohol and...
24 CFR 92.254 - Qualification as affordable housing: Homeownership.
Code of Federal Regulations, 2014 CFR
2014-04-01
... in the jurisdiction annually, as follows. The participating jurisdiction must set forth the price for... purchase price. (3) The housing must be acquired by a homebuyer whose family qualifies as a low-income... and set forth the requirements in its consolidated plan. HUD must determine that they are appropriate...
78 FR 18565 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
... action will be effective on April 29, 2013 unless comments are received which result in a contrary... Security Number, date of birth, job qualifications, DD Form 2648 (Pre-Separation Counseling Checklist), and... transition planning/counseling for individuals so that they may re-enter the civilian job market. Routine...
25 CFR 1200.14 - What must the Tribal Management Plan contain?
Code of Federal Regulations, 2010 CFR
2010-04-01
... of the following: (a) Tribal investment goals and the strategy for achieving them. (b) A description...., audited reports) and the identity and qualifications of the tribe's investment officer. (e) A description of the capability of all of the individuals or investment institutions that will be involved in...
42 CFR 484.16 - Condition of participation: Group of professional personnel.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agency in maintaining liaison with other health care providers in the community and in the agency's community information program. The meetings are documented by dated minutes. [54 FR 33367, August 14, 1989... supervision and plans of care, emergency care, clinical records, personnel qualifications, and program...
48 CFR 309.470-2 - Contents of reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contents of reports. 309.470-2 Section 309.470-2 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.470-2 Contents of reports. The Contracting Officer...
29 CFR 1952.210 - Description of the plan as initially approved.
Code of Federal Regulations, 2010 CFR
2010-07-01
... recommendations on adoption of at least as effective standards to the Commissioner within 6 months after Federal... issuance and posting of citations; a system of sanctions against employers for violations of standards... under the existing State merit system with the revisions in qualifications as stated in supplements to...
48 CFR 309.470-2 - Contents of reports.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Contents of reports. 309.470-2 Section 309.470-2 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.470-2 Contents of reports. The Contracting Officer...
48 CFR 309.470-2 - Contents of reports.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contents of reports. 309.470-2 Section 309.470-2 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.470-2 Contents of reports. The Contracting Officer...
48 CFR 309.470-2 - Contents of reports.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Contents of reports. 309.470-2 Section 309.470-2 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.470-2 Contents of reports. The Contracting Officer...
34 CFR 403.18 - What are the membership requirements of a State council on vocational education?
Code of Federal Regulations, 2013 CFR
2013-07-01
... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...
34 CFR 403.18 - What are the membership requirements of a State council on vocational education?
Code of Federal Regulations, 2014 CFR
2014-07-01
... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...
34 CFR 403.18 - What are the membership requirements of a State council on vocational education?
Code of Federal Regulations, 2011 CFR
2011-07-01
... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...
34 CFR 403.18 - What are the membership requirements of a State council on vocational education?
Code of Federal Regulations, 2012 CFR
2012-07-01
... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...
48 CFR 3409.570 - Certification at or below the simplified acquisition threshold.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Certification at or below the simplified acquisition threshold. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant...
48 CFR 3409.570 - Certification at or below the simplified acquisition threshold.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Certification at or below the simplified acquisition threshold. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant...
48 CFR 3409.570 - Certification at or below the simplified acquisition threshold.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Certification at or below the simplified acquisition threshold. 3409.570 Section 3409.570 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Organizational and Consultant...
Electric power system test and verification program
NASA Technical Reports Server (NTRS)
Rylicki, Daniel S.; Robinson, Frank, Jr.
1994-01-01
Space Station Freedom's (SSF's) electric power system (EPS) hardware and software verification is performed at all levels of integration, from components to assembly and system level tests. Careful planning is essential to ensure the EPS is tested properly on the ground prior to launch. The results of the test performed on breadboard model hardware and analyses completed to date have been evaluated and used to plan for design qualification and flight acceptance test phases. These results and plans indicate the verification program for SSF's 75-kW EPS would have been successful and completed in time to support the scheduled first element launch.
NASA Astrophysics Data System (ADS)
Martin Zurdo, M. J.
2012-07-01
The BepiColombo is a space mission to Mercury (ESA in cooperation with Japan Aerospace Exploration Agency). The spacecraft consist of three different structures: two orbiters responsible for the scientific mission (MPO and MMO) and one service module, Mercury Transfer Module (MTM), which provides propulsion and services during the journey to Mercury. Taking into account only the MTM structure, the companies involved are ASTRIUM GERMANY acting as the prime contractor and ASTRIUM UK acting as the co- prime contractor company. EADS CASA Espacio (ECE) in Spain is the company responsible for the final design, manufacturing and qualification of the MTM structure. The test campaign specimen is the MTM core structure, which corresponds to the central cone with the structure floors, shear panels and tank support structure. This test campaign qualifies the primary load path and its primary interfaces; the rest of the MTM structure is qualified by system level vibration test. In order to qualify the MTM structure, three different kinds of qualification tests have been performed: stiffness test, global strength test and local tests in different specific areas. The most relevant test during the campaign is the global strength test case, in which several external loads are introduced (different interfaces) simulating the load introduction for a selected critical flight case. There are two important items in the qualification test campaign: 1. The instrumentation of the structure, with two main functions: to control the specimen under test loads, and to demonstrate the qualification of the structure. 2. The set-up structure, designed by ECE to allow the correct load introduction on each testing case during the whole test campaign. This paper describes the MTM structure test campaign from the definition of the loads applied in each test to the qualification of the complete structure.
Simulators IV; Proceedings of the SCS Conference, Orlando, FL, Apr. 6-9, 1987
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fairchild, B.T.
1987-01-01
The conference presents papers on the applicability of AI techniques to simulation models, the simulation of a reentry vehicle on Simstar, simstar missile simulation, measurement issues associated with simulator sickness, and tracing the etiology of simulator sickness. Consideration is given to a simulator of a steam generator tube bundle response to a blowdown transient, the census of simulators for fossil fueled boiler and gas turbine plant operation training, and a new approach for flight simulator visual systems. Other topics include past and present simulated aircraft maintenance trainers, an AI-simulation based approach for aircraft maintenance training, simulator qualification using EPRI methodology,more » and the role of instinct in organizational dysfunction.« less
The SEIS Experiment for the Insight Mission: Development and management plan
NASA Astrophysics Data System (ADS)
Laudet, P.
2015-10-01
SEIS is a Mars seismometer, provided by CNES to JPL to be the threshold instrument of the next Mars mission, InSight, to be launched by NASA in March 2016. Discovery missions leads to a very strict frame of development, where schedule is driving development and qualification plans. We will explain how this constraint has been taken into account during development phases, until delivery of flight model, with a context of international cooperation without exchange of founds between partners.
Development of qualification guidelines for personal computer-based aviation training devices.
DOT National Transportation Integrated Search
1995-02-01
Recent advances in the capabilities of personal computers have resulted in an increase in the number of flight simulation programs made available as Personal Computer-Based Aviation Training Devices (PCATDs).The potential benefits of PCATDs have been...
Testing in Support of Space Fission System Development and Qualification
NASA Technical Reports Server (NTRS)
Houts, Mike; Bragg-Sitton, Shannon; Garber, Anne; Godfrey, Tom; Martin, Jim; Pearson, Boise; Webster, Kenny
2007-01-01
Extensive data would be required for the qualification of a fission surface power (FSP) system. The strategy for qualifying a FSP system could have a significant programmatic impact. This paper explores potential options that could be used for qualifying FSP systems, including cost-effective means for obtaining required data. three methods for obtaining qualification data are analysis, non-nuclear testing, and nuclear testing. It has been over 40 years since the US qualified a space reactor for launch. During that time, advances have been made related to all three methods. Perhaps the greatest advancement has occurred in the area of computational tools for design and analysis. Tools that have been developed, coupled with modem computers, would have a significant impact on a FSP qualification. This would be especially true for systems with materials and fuels operating well within temperature, irradiation damage, and burnup limits. The ability to perform highly realistic non-nuclear testing has also advanced throughout the past four decades. Instrumented thermal simulators were developed during the 1970s and 1980s to assist in the development, operation, and assessment of terrestrial fission systems. Instrumented thermal simulators optimized for assisting in the development, operation, and assessment of modem FSP systems have been under development (and utilized) since 1998. These thermal simulators enable heat from fission to be closely mimicked (axial power profile, radial power profile, temperature, heat flux, etc.} and extensive data to be taken from the core region. Both steady-state and transient operation can be tested. For transient testing, reactivity feedback is calculated (or measured in cold/warm criticals) based on reactor temperature and/or dimensional changes. Pin power during a transient is then calculated based on the reactivity feedback that would occur given measured values of temperature and/or dimensional change. In this way nonnuclear testing can be used to provide very realistic information related to nuclear operation. Non-nuclear testing can be used at all levels, including component, subsystem, and integrated system testing. Realistic non-nuclear testing is most useful for systems operating within known temperature, irradiation damage, and burnup capabilities.
AGR-3/4 Final Data Qualification Report for ATR Cycles 151A through 155B-1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pham, Binh T.
2015-03-01
This report provides the qualification status of experimental data for the entire Advanced Gas Reactor 3/4 (AGR 3/4) fuel irradiation. AGR-3/4 is the third in a series of planned irradiation experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) for the AGR Fuel Development and Qualification Program, which supports development of the advanced reactor technology under the INL ART Technology Development Office (TDO). The main objective of AGR-3/4 irradiation is to provide a known source of fission products for subsequent transport through compact matrix and structural graphite materials due to the presence of designed-to-fail fuel particles.more » Full power irradiation of the AGR 3/4 test began on December 14, 2011 (ATR Cycle 151A), and was completed on April 12, 2014 (end of ATR Cycle 155B) after 369.1 effective full power days of irradiation. The AGR-3/4 test was in the reactor core for eight of the ten ATR cycles between 151A and 155B. During the unplanned outage cycle, 153A, the experiment was removed from the ATR northeast flux trap (NEFT) location and stored in the ATR canal. This was to prevent overheating of fuel compacts due to higher than normal ATR power during the subsequent Powered Axial Locator Mechanism cycle, 153B. The AGR 3/4 test was inserted back into the ATR NEFT location during the outage of ATR Cycle 154A on April 26, 2013. Therefore, the AGR-3/4 irradiation data received during these 2 cycles (153A and 153B) are irrelevant and their qualification status isnot included in this report. Additionally, during ATR Cycle 152A the ATR core ran at low power for a short enough duration that the irradiation data are not used for physics and thermal calculations. However, the qualification status of irradiation data for this cycle is still covered in this report. As a result, this report includes data from 8 ATR Cycles: 151A, 151B, 152A, 152B, 154A, 154B, 155A, and 155B, as recorded in the Nuclear Data Management and Analysis System (NDMAS). The AGR 3/4 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates, pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates, release to birth rate ratios [R/Bs], and particle failure counts) for each of the twelve capsules in the AGR 3/4 experiment. During Outage Cycle 155A, fourteen flow meters were installed downstream from fourteen FPMS monitors to measure flows from the monitors; qualification status of these data are also included in the report. The final data qualification status for these data streams is determined by a Data Review Committee (DRC) composed of AGR technical leads, Sitewide Quality Assurance (QA), and NDMAS analysts. For ATR Cycles 151A through 154B, the DRC convened on February 12, 2014, reviewed the data acquisition process, and considered whether the data met the requirements for data collection as specified in QA approved INL ART TDO data collection plans. The DRC also examined the results of NDMAS data testing and statistical analyses, and confirmed the qualification status of the data as given in this report. The qualification status of AGR-3/4 irradiation data during the first six cycles were previously reported in INL/EXT-14-31186 document. This report presents data qualification status for the entire AGR-3/4 irradiation.« less
Space flight requirements for fiber optic components: qualification testing and lessons learned
NASA Astrophysics Data System (ADS)
Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam
2006-04-01
"Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the engineers of design, development and components, and vendors of commercial components with how to make an efficient and effective qualification test plan with some basic generic information about many space flight requirements. Issues related to the physics of failure, acceptance criteria and lessons learned will also be discussed to assist with understanding how to approach a space flight mission in an ever changing commercial photonics industry.
Space Flight Requirements for Fiber Optic Components; Qualification Testing and Lessons Learned
NASA Technical Reports Server (NTRS)
Ott, Melanie N.; Jin, Xiaodan Linda; Chuska, Richard; Friedberg, Patricia; Malenab, Mary; Matuszeski, Adam
2007-01-01
"Qualification" of fiber optic components holds a very different meaning than it did ten years ago. In the past, qualification meant extensive prolonged testing and screening that led to a programmatic method of reliability assurance. For space flight programs today, the combination of using higher performance commercial technology, with shorter development schedules and tighter mission budgets makes long term testing and reliability characterization unfeasible. In many cases space flight missions will be using technology within years of its development and an example of this is fiber laser technology. Although the technology itself is not a new product the components that comprise a fiber laser system change frequently as processes and packaging changes occur. Once a process or the materials for manufacturing a component change, even the data that existed on its predecessor can no longer provide assurance on the newer version. In order to assure reliability during a space flight mission, the component engineer must understand the requirements of the space flight environment as well as the physics of failure of the components themselves. This can be incorporated into an efficient and effective testing plan that "qualifies" a component to specific criteria defined by the program given the mission requirements and the component limitations. This requires interaction at the very initial stages of design between the system design engineer, mechanical engineer, subsystem engineer and the component hardware engineer. Although this is the desired interaction what typically occurs is that the subsystem engineer asks the components or development engineers to meet difficult requirements without knowledge of the current industry situation or the lack of qualification data. This is then passed on to the vendor who can provide little help with such a harsh set of requirements due to high cost of testing for space flight environments. This presentation is designed to guide the engineers of design, development and components, and vendors of commercial components with how to make an efficient and effective qualification test plan with some basic generic information about many space flight requirements. Issues related to the physics of failure, acceptance criteria and lessons learned will also be discussed to assist with understanding how to approach a space flight mission in an ever changing commercial photonics industry.
Psycho-Social Factors Causing Stress: A Study of Teacher Educators
ERIC Educational Resources Information Center
Jain, Geetika; Tyagi, Harish Kumar; Kumar, Anil
2015-01-01
Purpose: The present investigation was planned to determine the influence of type of personality, gender, age, qualification and experience causing stress among teacher educators at work. Method: A sample of 100 subjects from male and female teachers teaching in teacher training colleges, Delhi, India was drawn randomly. The data was collected by…
Design, Implementation, and Evaluation of a Postgraduate Diploma in Surgical Anatomy
ERIC Educational Resources Information Center
Stringer, Mark D.; Lyall, Patrick
2012-01-01
After careful planning, a postgraduate Diploma in Surgical Anatomy was launched in 2009. This report describes the structure of the program, the challenges encountered in implementing and running the course, and results of evaluations. The qualification is targeted at junior doctors intending to become surgeons or radiologists and aims to equip…
Guidelines for qualifying cleaning and verification materials
NASA Technical Reports Server (NTRS)
Webb, D.
1995-01-01
This document is intended to provide guidance in identifying technical issues which must be addressed in a comprehensive qualification plan for materials used in cleaning and cleanliness verification processes. Information presented herein is intended to facilitate development of a definitive checklist that should address all pertinent materials issues when down selecting a cleaning/verification media.
32 CFR 37.515 - Must I do anything additional to determine the qualification of a consortium?
Code of Federal Regulations, 2011 CFR
2011-07-01
... consultation with legal counsel, review the management plan in the consortium's collaboration agreement. The... relationship is essential to increase the research project's chances of success. (b) The collaboration agreement, commonly referred to as the articles of collaboration, is the document that sets out the rights...
A Woman with a Plan: Recognizing Competencies for Ascent to Administration in Higher Education
ERIC Educational Resources Information Center
Turner, Paaige K.; Norwood, Kristen; Noe, Charlotte
2013-01-01
Despite progress, women are still disproportionally underrepresented in leadership positions in higher education. Women must contend with a glass ceiling, which we argue is constituted by discourses of impossibility and femininity. These discourses discourage women from recognizing their qualifications, continuing to develop skills, and making a…
Code of Federal Regulations, 2014 CFR
2014-01-01
... departments or other local authorities for use in developing pre-fire plans. ... Fire Prevention Equivalent Level of Safety Analysis § 102-80.125 Who has the responsibility for... acceptability must include a review of the fire protection engineer's qualifications, the appropriateness of the...
Code of Federal Regulations, 2012 CFR
2012-01-01
... departments or other local authorities for use in developing pre-fire plans. ... Fire Prevention Equivalent Level of Safety Analysis § 102-80.125 Who has the responsibility for... acceptability must include a review of the fire protection engineer's qualifications, the appropriateness of the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... departments or other local authorities for use in developing pre-fire plans. ... Fire Prevention Equivalent Level of Safety Analysis § 102-80.125 Who has the responsibility for... acceptability must include a review of the fire protection engineer's qualifications, the appropriateness of the...
Code of Federal Regulations, 2011 CFR
2011-01-01
... departments or other local authorities for use in developing pre-fire plans. ... Fire Prevention Equivalent Level of Safety Analysis § 102-80.125 Who has the responsibility for... acceptability must include a review of the fire protection engineer's qualifications, the appropriateness of the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... departments or other local authorities for use in developing pre-fire plans. ... Fire Prevention Equivalent Level of Safety Analysis § 102-80.125 Who has the responsibility for... acceptability must include a review of the fire protection engineer's qualifications, the appropriateness of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
....110722404-1405-01 ] RIN 0648-BA56 Atlantic Coastal Fisheries Cooperative Management Act Provisions; American... Management Area 1 (Federal inshore waters-Gulf of Maine). Upon qualification, permit holders would be allowed... Fishery Management Plan for American Lobster. DATES: We must receive your comments no later than 5 p.m...
48 CFR 309.470-1 - Situations where reports are required.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Situations where reports are required. 309.470-1 Section 309.470-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.470-1 Situations where reports are...
48 CFR 309.470-1 - Situations where reports are required.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Situations where reports are required. 309.470-1 Section 309.470-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.470-1 Situations where reports are...
48 CFR 309.470-1 - Situations where reports are required.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Situations where reports are required. 309.470-1 Section 309.470-1 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 309.470-1 Situations where reports are...