Sample records for site development plan

  1. Model Development and Process Analysis for Lean Cellular Design Planning in Aerospace Assembly and Manufacturing

    NASA Astrophysics Data System (ADS)

    Hilburn, Monty D.

    Successful lean manufacturing and cellular manufacturing execution relies upon a foundation of leadership commitment and strategic planning built upon solid data and robust analysis. The problem for this study was to create and employ a simple lean transformation planning model and review process that could be used to identify functional support staff resources required to plan and execute lean manufacturing cells within aerospace assembly and manufacturing sites. The lean planning model was developed using available literature for lean manufacturing kaizen best practices and validated through a Delphi panel of lean experts. The resulting model and a standardized review process were used to assess the state of lean transformation planning at five sites of an international aerospace manufacturing and assembly company. The results of the three day, on-site review were compared with baseline plans collected from each of the five sites to determine if there analyzed, with focus on three critical areas of lean planning: the number and type of manufacturing cells identified, the number, type, and duration of planned lean and continuous kaizen events, and the quantity and type of functional staffing resources planned to support the kaizen schedule. Summarized data of the baseline and on-site reviews was analyzed with descriptive statistics. ANOVAs and paired-t tests at 95% significance level were conducted on the means of data sets to determine if null hypotheses related to cell, kaizen event, and support resources could be rejected. The results of the research found significant differences between lean transformation plans developed by site leadership and plans developed utilizing the structured, on-site review process and lean transformation planning model. The null hypothesis that there was no difference between the means of pre-review and on-site cell counts was rejected, as was the null hypothesis that there was no significant difference in kaizen event plans. These factors are critical inputs into the support staffing resources calculation used by the lean planning model. Null hypothesis related to functional support staff resources was rejected for most functional groups, indicating that the baseline site plan inadequately provided for cross-functional staff involvement to support the lean transformation plan. Null hypotheses related to total lean transformation staffing could not be rejected, indicating that while total staffing plans were not significantly different than plans developed during the on-site review and through the use of the lean planning model, the allocation of staffing among various functional groups such as engineering, production, and materials planning was an issue. The on-site review process and simple lean transformation plan developed was determined to be useful in identifying short-comings in lean transformation planning within aerospace manufacturing and assembly sites. It was concluded that the differences uncovered were likely contributing factors affecting the effectiveness of aerospace manufacturing sites' implementation of lean cellular manufacturing.

  2. 14 CFR 420.59 - Launch site accident investigation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch site accident investigation plan... Licensee § 420.59 Launch site accident investigation plan. (a) General. A licensee shall develop and implement a launch site accident investigation plan that contains the licensee's procedures for reporting...

  3. 14 CFR 420.59 - Launch site accident investigation plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Launch site accident investigation plan... Licensee § 420.59 Launch site accident investigation plan. (a) General. A licensee shall develop and implement a launch site accident investigation plan that contains the licensee's procedures for reporting...

  4. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  5. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  6. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  7. Solid waste management complex site development plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  8. The School Site Planner. Land for Learning. Site Selection, Site Planning, Playgrounds, Recreation, and Athletic Fields.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Support.

    The selection and planning of sites for school facilities can be critical and difficult due to the varied and complex demands schools must satisfy. This publication addresses the many factors that need consideration during the process of site selection, planning, development, and use. The report examines not only the site selection and planning…

  9. A Vision for the Future: Site-Based Strategic Planning.

    ERIC Educational Resources Information Center

    Herman, Jerry J.

    1989-01-01

    Presents a model to help principals with strategic planning. Success hinges on involving stakeholders, scanning for relevant data, identifying critical success factors, developing vision and mission statements, analyzing the site manager's supports and constraints, creating strategic goals and objectives, developing action plans, allocating…

  10. Energy conserving site design case study: Shenandoah, Georgia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as amore » passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)« less

  11. A needs analysis method for land-use planning of illegal dumping sites: a case study in Aomori-Iwate, Japan.

    PubMed

    Ishii, Kazuei; Furuichi, Toru; Nagao, Yukari

    2013-02-01

    Land use at contaminated sites, following remediation, is often needed for regional redevelopment. However, there exist few methods of developing economically and socially feasible land-use plans based on regional needs because of the wide variety of land-use requirements. This study proposes a new needs analysis method for the conceptual land-use planning of contaminated sites and illustrates this method with a case study of an illegal dumping site for hazardous waste. In this method, planning factors consisting of the land-use attributes and related facilities are extracted from the potential needs of the residents through a preliminary questionnaire. Using the extracted attributes of land use and the related facilities, land-use cases are designed for selection-based conjoint analysis. A second questionnaire for respondents to the first one who indicated an interest in participating in the second questionnaire is conducted for the conjoint analysis to determine the utility function and marginal cost of each attribute in order to prioritize the planning factors to develop a quantitative and economically and socially feasible land-use plan. Based on the results, site-specific land-use alternatives are developed and evaluated by the utility function obtained from the conjoint analysis. In this case study of an illegal dumping site for hazardous waste, the uses preferred as part of a conceptual land-use plan following remediation of the site were (1) agricultural land and a biogas plant designed to recover energy from biomass or (2) a park with a welfare facility and an athletic field. Our needs analysis method with conjoint analysis is applicable to the development of conceptual land-use planning for similar sites following remediation, particularly when added value is considered. Copyright © 2012 Elsevier Ltd. All rights reserved.

  12. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less

  13. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  14. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  15. Site scientific mission plan for the Southern Great Plains CART site, January-June 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.

    1994-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less

  16. THE SCHOOL SITE--ITS SELECTION, ANALYSIS, DEVELOPMENT AND MAINTENANCE.

    ERIC Educational Resources Information Center

    BRUNING, WALTER F.

    SCHOOL ADMINISTRATORS AND COMMUNITY PLANNERS CAN AID THE SCHOOL SITE SELECTION PROCESS BY WORKING TOGETHER ON A COMMUNITY MASTER PLAN. MANY COMMUNITIES HAVE DEVELOPED SUCH A PLAN UNDER THE STATE AND FEDERALLY AIDED 701 PROGRAM. SOUND SITE SELECTION PRINCIPLES REQUIRE CONSIDERATION OF OTHER FACTORS THAN STUDENT POPULATION DISTRIBUTION. IDEALLY…

  17. Development of policies for Natura 2000 sites: a multi-criteria approach to support decision makers.

    PubMed

    Cortina, Carla; Boggia, Antonio

    2014-08-01

    The aim of this study is to present a methodology to support decision makers in the choice of Natura 2000 sites needing an appropriate management plan to ensure a sustainable socio-economic development. In order to promote sustainable development in the Natura 2000 sites compatible with nature preservation, conservation measures or management plans are necessary. The main issue is to decide when only conservation measures can be applied and when the sites need an appropriate management plan. We present a case study for the Italian Region of Umbria. The methodology is based on a multi-criteria approach to identify the biodiversity index (BI), and on the development of a human activities index (HAI). By crossing the two indexes for each site on a Cartesian plane, four groups of sites were identified. Each group corresponds to a specific need for an appropriate management plan. Sites in the first group with a high level both of biodiversity and human activities have the most urgent need of an appropriate management plan to ensure sustainable development. The proposed methodology and analysis is replicable in other regions or countries by using the data available for each site in the Natura 2000 standard data form. A multi-criteria analysis is especially suitable for supporting decision makers when they deal with a multidimensional decision process. We found the multi-criteria approach particularly sound in this case, due to the concept of biodiversity itself, which is complex and multidimensional, and to the high number of alternatives (Natura 2000 sites) to be assessed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  18. Wilderness and backcountry site restoration guide

    Treesearch

    Lisa Therrell; David Cole; Victor Claassen; Chris Ryan; Mary Ann Davies

    2006-01-01

    This comprehensive guide focuses on restoration of small-scale impact caused by human actions in wilderness and backcountry areas. The guide's goals are to: 1) Help practitioners develop plans that thoroughly address the question of whether site restoration is the best management action and, if so, develop a site-specific restoration plan that incorporates...

  19. Master Plans for Park Sites.

    ERIC Educational Resources Information Center

    Van Meter, Jerry R.

    This booklet is a general guide to park site planning. The four basic steps involved in developing a park site are a) determination of the uses of the site, b) analysis of the site potential for these uses, c) identification of the functional relationship among the uses, and d) coordination of the uses to the park sites. Uses of park sites are…

  20. Low-Impact Development Design—Integrating Suitability Analysis and Site Planning For Reduction Of Post-Development Stormwater Quantity

    EPA Science Inventory

    A land-suitability analysis (LSA) was integrated with open-space conservation principles, based on watershed physiographic and soil characteristics, to derive a low-impact development (LID) residential plan for a three hectare site in Coshocton OH, USA. The curve number method wa...

  1. 7 CFR 1924.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.101 Purpose. This subpart establishes the basic Rural Housing Service (RHS) policies for planning and performing site development work...

  2. LAKE PONTCHARTRAIN ESTUARY CONSERVATION PLAN

    EPA Science Inventory

    The Nature Conservancy will conduct a series of a least four science expert workshops to develop a Site Conservation Plan for the Lake Pontchartrain Estuary and adjacent wetlands. The objective of the Site Conservation Plan is to identify conservation targets, threats or stresse...

  3. SAMPLING OF CONTAMINATED SITES

    EPA Science Inventory

    A critical aspect of characterization of the amount and species of contamination of a hazardous waste site is the sampling plan developed for that site. f the sampling plan is not thoroughly conceptualized before sampling takes place, then certain critical aspects of the limits o...

  4. Ants as a measure of effectiveness of habitat conservation planning in southern California

    USGS Publications Warehouse

    Mitrovich, Milan J.; Matsuda, Tritia; Pease, Krista H.; Fisher, Robert N.

    2010-01-01

    In the United States multispecies habitat conservation plans were meant to be the solution to conflicts between economic development and protection of biological diversity. Although now widely applied, questions exist concerning the scientific credibility of the conservation planning process and effectiveness of the plans. We used ants to assess performance of one of the first regional conservation plans developed in the United States, the Orange County Central-Coastal Natural Community Conservation Plan (NCCP), in meeting its broader conservation objectives of biodiversity and ecosystem-level protection. We collected pitfall data on ants for over 3 years on 172 sites established across a network of conservation lands in coastal southern California. Although recovered native ant diversity for the study area was high, site-occupancy models indicated the invasive and ecologically disruptive Argentine ant ( Linepithema humile) was present at 29% of sites, and sites located within 200 m of urban and agricultural areas were more likely to have been invaded. Within invaded sites, native ants were largely displaced, and their median species richness declined by more than 60% compared with uninvaded sites. At the time of planning, 24% of the 15,133-ha reserve system established by Orange County NCCP fell within 200 m of an urban or agricultural edge. With complete build out of lands surrounding the reserve, the proportion of the reserve system vulnerable to invasion will grow to 44%. Our data indicate that simply protecting designated areas from development is not enough. If habitat conservation plans are to fulfill their conservation promise of ecosystem-level protection, a more-integrated and systematic approach to the process of habitat conservation planning is needed.

  5. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less

  6. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  7. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  8. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  9. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  10. EPA Helps Two New England Communities Plan New Uses for Former Brownfield Sites

    EPA Pesticide Factsheets

    The U.S.EPA has selected the City of Providence, RI & the Eastern Maine Development Corp. to receive funding to assist with planning for cleanup & reuse of Brownfield sites as part of the Brownfields Area-Wide Planning (AWP) program.

  11. Biomass power for rural development. Technical progress report, January 1--March 31, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.

  12. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less

  13. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  14. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  15. 15 CFR 921.13 - Management plan and environmental impact statement development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Management plan and environmental... Selection, Post Site Selection and Management Plan Development § 921.13 Management plan and environmental... of acquisition and development. A categorical exclusion, environmental assessment, or EIS may be...

  16. Site Plan: A First Step.

    ERIC Educational Resources Information Center

    Gould, Bryant; Finci, David

    1986-01-01

    A campus-wide site plan looks at the campus as a whole and defines immediate and long-range problems and potential. Text and photographs illustrate site development at McClennan Community College in Waco, Texas, and at the University of Toledo and the University of Dayton, both in Ohio. (MLF)

  17. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Planmore » for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs.« less

  18. Commercial Space Port Planning in Texas

    NASA Astrophysics Data System (ADS)

    Bell, L.; Looke, B.

    2002-01-01

    The Texas Legislature is providing funding to support research and planning activities aimed at creating a commercial spaceport in the state. These monies have been allocated to regional Spaceport Development Corporations that have been established in three countries containing candidate site locations: Willacy County (in South Texas); Brazoria County (East Texas); and Pecos County (West Texas). This program is being sponsored and coordinated by the Texas Aerospace Commission (TAC). The Sasakawa International Center for Space Architecture (SICSA) at the University of Houston is providing research, planning and design support to TAC and is a member of each of the three regional development teams. Planning must carefully consider special support requirements and operational characteristics of all prospective launch systems along with geographic, infrastructure and environmental factors at each site. Two of the candidate sites are in coastal areas; a priority for certain launch service providers; whereas the third inland site is more attractive to others. Candidate launch systems include winged horizontal takeoff air-launch vehicles, vertical multi-stage reusable launch vehicles, and expendable sub-orbital surrounding rockets. Important research and planning activities include environmental impact assessments, analyses of overflight hazards, investigations of economic impacts and business plan development. The results of these activities will guide master plan development for each site, including: a physical plan (site layout, infrastructure improvements and facility construction); and a strategic plan (user agreements, licenses, finance sources and participants). Commercial spaceport development demands compliance with stringent FAA regulations established by the Office of Commercial Space Transportation (OCST) which exceed minimum standards allowed for U.S. Government spaceport facilities. Key among these requirements are 15,000 ft. radius on-site clear zones separating launch areas form inhabited facilities, and extremely conservative flight risk restrictions associated with launch trajectories over populated areas. Unless modified, the flight risk criteria currently mandated will prevent virtually all new U.S. commercial spaceport operating license proposals from being approved. Commercial spaceport development also presents significant financing challenges. New launch service companies typically lack substantial economic resources needed for infrastructure construction such as long horizontal runways, launch platforms and vehicle assembly and payload integration facilities. Outside investment sources much be identified, with supplementary revenues potentially derived from space tourism and ancillary public service uses. Texas spaceport planning sponsors, participants and advocates recognize that such a development warrants the necessary investment. It will support the advancement and services of new generations of launch systems vitally needed to reduce the high costs of space access. It will afford new state-wide, regional and local economic development opportunities that promote business investments, create jobs and expand infrastructure resources. It will also support a wide spectrum of educational objectives by including and serving academic programs at all levels. Regardless which site is ultimately selected, all Texas regions and public interests in general will benefit.

  19. Environmental Development cum Forest Plantation Planning and Management.

    ERIC Educational Resources Information Center

    Katoch, C. D.

    This textbook covers environmental conservation through forest plantation planning and management for all levels of forestry professionals and non-professionals in India and abroad. The book is divided into six parts and 29 sections in sequential order. Part I contains details on site selection, site preparations, site clearance, layout, and…

  20. Outdoor Education - A Guide to Site Planning and Implementation of Programs.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin. Div. of Curriculum Development.

    This booklet presents guidelines for initiating outdoor instructional programs. Initially, the guide lists the objectives of outdoor education: survival, recreation, development of personal health and well-being, career opportunities, and social adjustment. A discussion follows on the three phases of site planning. The first phase is site analysis…

  1. Intergenerational equity and long-term stewardship plans.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hocking, E. K.

    2002-02-05

    For an untold number of contaminated sites throughout the world, stewardship will be inevitable. For many such sites, stewardship will be a reasonable approach because of the uncertainties associated with present and future site conditions and site contaminants, the limited performance of available technologies, the nonavailability of technologies, and the risk and cost associated with complete cleanup. Regardless of whether stewardship is a realistic approach to site situations or simply a convenient default, it could be required at most contaminated sites for multiple generations. Because the stewardship plan is required to protect the release of hazardous contaminants to the environment,more » some use restrictions will be put in place to provide that protection. These use restrictions will limit access to resources for as long as the protection is required. The intergenerational quality of long-term stewardship plans and their inherent limitations on resource use require that they be designed to achieve equity among the affected generations. Intergenerational equity, defined here as the fairness of access to resources across generations, could be achieved through a well-developed stewardship plan that provides future generations with the information they need to make wise decisions about resource use. Developing and implementing such a plan would take into account the failure mechanisms of the plan's components, feature short stewardship time blocks that would allow for periodic reassessments of the site and of the stewardship program's performance, and provide present and future generations with necessary site information.« less

  2. Comprehensive facilities plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less

  3. Development of Physical Protection Regulations for Rosatom State Corporation Sites under the U.S.-Russian MPC&A Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Izmaylov, Alexander; Babkin, Vladimir; Shemigon, Nikolai N.

    2012-07-14

    This paper describes issues related to upgrading the physical protection regulatory basis for Rosatom State Corporation sites. It is underlined that most of the regulatory and methodological documents for this subject area have been developed under the U.S.-Russian MPC&A Program. According to the joint management plan developed and agreed upon by the parties in 2005, nearly 50 physical protection documents were identified to be developed, approved and implemented at Rosatom sites by 2012. It is also noted that, on the whole, the plans have been fulfilled.

  4. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  5. Draft Site Treatment Plan (DSTP), Volumes I and II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D`Amelio, J.

    1994-08-30

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilitiesmore » is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.« less

  6. Institutional Controls: A Guide to Preparing Institutional Control Implementation and Assurance Plans at Contaminated Sites

    EPA Pesticide Factsheets

    The purpose of this document is to provide guidance to the EPA Regions for developing Institutional Control Implementation and Assurance Plans (ICIAPs) at contaminated sites where the response action includes an institutional controls (ICs) component.

  7. Exercises in Emergency Preparedness for Health Professionals in Community Clinics

    PubMed Central

    Blossom, H. John; Sandrock, Christian; Mitchell, Brenda; Brandstein, Kendra

    2010-01-01

    Health professionals in community settings are generally unprepared for disasters. From 2006 to 2008 the California Statewide Area Health Education Center (AHEC) program conducted 90 table top exercises in community practice sites in 18 counties. The exercises arranged and facilitated by AHEC trained local coordinators and trainers were designed to assist health professionals in developing and applying their practice site emergency plans using simulated events about pandemic influenza or other emergencies. Of the 1,496 multidisciplinary health professionals and staff participating in the exercises, 1,176 (79%) completed learner evaluation forms with 92–98% of participants rating the training experiences as good to excellent. A few reported helpful effects when applying their training to a real time local disaster. Assessments of the status of clinic emergency plans using 15 criteria were conducted at three intervals: when the exercises were scheduled, immediately before the exercises, and for one-third of sites, three months after the exercise. All sites made improvements in their emergency plans with some or all of the plan criteria. Of the sites having follow up, most (N = 23) were community health centers that made statistically significant changes in two-thirds of the plan criteria (P = .001–.046). Following the exercises, after action reports were completed for 88 sites and noted strengths, weaknesses, and plans for improvements in their emergency plans Most sites (72–90%) showed improvements in how to activate their plans, the roles of their staff, and how to participate in a coordinated response. Challenges in scheduling exercises included time constraints and lack of resources among busy health professionals. Technical assistance and considerations of clinic schedules mitigated these issues. The multidisciplinary table top exercises proved to be an effective means to develop or improve clinic emergency plans and enhance the dialogue and coordination among health professionals before an emergency happens. PMID:20146093

  8. 10 CFR 60.17 - Contents of site characterization plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.17 Contents of site characterization plan. The... construction authorization for a geologic repository operations area; (4) Criteria, developed pursuant to... area for the location of a geologic repository; and (5) Any other information which the Commission, by...

  9. The Four Levels of Web Site Development Expertise.

    ERIC Educational Resources Information Center

    Ingram, Albert L.

    2000-01-01

    Discusses the design of Web pages and sites and proposes a four-level model of Web development expertise that can serve as a curriculum overview or as a plan for an individual's professional development. Highlights include page design, media use, client-side processing, server-side processing, and site structure. (LRW)

  10. An Annotated Bibliography for the Development and Operation of Historic Sites.

    ERIC Educational Resources Information Center

    American Association of Museums, Washington, DC.

    Over 340 books, articles, manuals, newsletters, and other publications concerning the development and operation of historic sites are listed. Most cited materials were published since 1972 and are arranged under four major categories: site development and planning, documentation and preservation of structures and objects, interpretation of…

  11. Stormwater Management Plan for the Arden Hills Army Training Site, Arden Hills, Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carr, Adrianne E.; Wuthrich, Kelsey K.; Ziech, Angela M.

    2013-03-01

    This stormwater management plan focuses on the cantonment and training areas of the Arden Hills Army Training Site (AHATS). The plan relates the site stormwater to the regulatory framework, and it summarizes best management practices to aide site managers in promoting clean site runoff. It includes documentation for a newly developed, detailed model of stormwater flow retention for the entire AHATS property and adjacent upgradient areas. The model relies on established modeling codes integrated in a U.S. Department of Defense-sponsored software tool, the Watershed Modeling System (WMS), and it can be updated with data on changes in land use ormore » with monitoring data.« less

  12. Faculty Development. [SITE 2001 Section].

    ERIC Educational Resources Information Center

    Gillan, Bob, Ed.; McFerrin, Karen, Ed.

    This document contains the papers on faculty development from the SITE (Society for Information Technology & Teacher Education) 2001 conference. Topics covered include: a system of faculty development; a faculty development program for medical educators; developing a faculty of education technology integration plan; supporting the development…

  13. Annual Reports Regarding Progress in Developing a Dredged Material Management Plan for the Long Island Sound Region

    EPA Pesticide Factsheets

    The site designation for the Western and Central Long Island Sound disposal sites requires the completion of a Dredged Material Management Plan (DMMP) and EPA to conduct an annual review of progress toward completion of the DMMP.

  14. NHEERL CONTAMINATED SEDIMENT RESEARCH MULTI-YEAR IMPLEMENTATION PLAN (2005)

    EPA Science Inventory

    ORD has developed a multi-year plan (MYP) called the Contaminated Sites MYP to address the research needs of EPA's Office of Superfund Remediation and Technology Innovation (OSRTI). One of the long-term goals of the Contaminated Sites MYP relates to contaminated sediments, and t...

  15. 78 FR 59913 - Revision of the Land Management Plan for the Francis Marion National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... our Web site. We are inviting the public to help us develop a preliminary ``need for change'' and a... revision of the Francis Marion NF land management plan will be posted on the following Web site at www.fs... preliminary ``need for change'' and a proposed action will be announced on the Web site cited above. It is...

  16. 78 FR 69814 - Revision of the Land Management Plan for El Yunque National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... to our Web site. We are inviting the public to help us develop a preliminary ``need for change'' and... the revision of El Yunque NF land management plan will be posted on the following Web site at www.fs... preliminary ``need for change'' and a proposed action will be announced on the Web site cited above. It is...

  17. School Site Decisions and Dollars. Dollar Consequences of School Site Planning Decisions.

    ERIC Educational Resources Information Center

    Grube, Karl W.

    Sufficient research has been generated to economically justify the necessary capital investment expenditures in developing the public school site into a community land asset. Open space school sites designed, developed, and maintained as community land reserves are self-liquidating economic land units because they contribute significantly to the…

  18. Initiatives to Develop Web Sites Including Information about Brownfields Properties

    EPA Pesticide Factsheets

    This web site was created to assist in planning, designing, and operating web sites that include information about individual brownfields properties. The report is of value to parties designing or managing such sites.

  19. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  20. Analysis of decision support system for dredging operations management.

    DOT National Transportation Integrated Search

    2005-12-01

    This research developed an improved method for optimizing the disposal of dredged material : at offshore disposal sites. A nonlinear programming model has been developed to assist in : the development of dredging plans at open water disposal sites. T...

  1. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  2. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less

  3. Wind Powering America State Outreach. Final Technical Report: Washington State

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stearns, Tim

    2013-09-30

    The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less

  4. Site and Facilities: A Resource Book for Camps.

    ERIC Educational Resources Information Center

    Ball, Armand, Ed.; Ball, Beverly, Ed.

    This resource book draws together articles on the development and maintenance of camp sites and facilities. The articles, previously published by "Camping Magazine" and "Journal of Christian Camping," cover (1) site planning and long-range development, including redesigning multiple camp facilities for year-round programs, remodeling and…

  5. Montana geothermal commercialization planning. Semi-annual progress report, January 1, 1979-June 30, 1979

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birkby, J.; Brown, K.; Chapman, M.

    1979-06-01

    Area development plans were prepared which describe geothermal resources and their potential use on a county or multicounty basis. Development plans for two areas are presented. Cost analyses show that the proximity of the geothermal resource to the end user is the most important criterion in geothermal energy development. Thirteen tentative site-specific plans are being revised. The analysis of institutional factors affecting geothermal development, the outreach, and the state geothermal are discussed briefly. (MHR)

  6. San Diego's Capital Planning Process

    ERIC Educational Resources Information Center

    Lytton, Michael

    2009-01-01

    This article describes San Diego's capital planning process. As part of its capital planning process, the San Diego Unified School District has developed a systematic analysis of functional quality at each of its school sites. The advantage of this approach is that it seeks to develop and apply quantifiable metrics and standards for the more…

  7. Guide for Educational Planning of Public School Buildings and Sites in Minnesota. Revised.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Administration, St. Paul. Documents Section.

    This guide serves as a manual for Minnesota school boards, administrators, architects, engineers, and others engaged in developing school plant programs. Part I considers State and local responsibilities in school plant planning procedures; Part II deals with site selection and the requirements for elementary, secondary, service, central, and…

  8. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  9. Evaluation of components, subsystems, and networks for high rate, high frequency space communications

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert J.; Ivancic, William D.; Zuzek, John E.

    1991-01-01

    The development of new space communications technologies by NASA has included both commercial applications and space science requirements. At NASA's Lewis Research Center, methods and facilities have been developed for evaluating these new technologies in the laboratory. NASA's Systems Integration, Test and Evaluation (SITE) Space Communication System Simulator is a hardware-based laboratory simulator for evaluating space communications technologies at the component, subsystem, system, and network level, geared toward high frequency, high data rate systems. The SITE facility is well-suited for evaluation of the new technologies required for the Space Exploration Initiative (SEI) and advanced commercial systems. This paper describes the technology developments and evaluation requirements for current and planned commercial and space science programs. Also examined are the capabilities of SITE, the past, present, and planned future configurations of the SITE facility, and applications of SITE to evaluation of SEI technology.

  10. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  11. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  12. [On-site quality control of acupuncture randomized controlled trial: design of content and checklist of quality control based on PICOST].

    PubMed

    Li, Hong-Jiao; He, Li-Yun; Liu, Zhi-Shun; Sun, Ya-Nan; Yan, Shi-Yan; Liu, Jia; Zhao, Ye; Liu, Bao-Yan

    2014-02-01

    To effectively guarantee quality of randomized controlld trial (RCT) of acupuncture and develop reasonable content and checklist of on-site quality control, influencing factors on quality of acupuncture RCT are analyzed and scientificity of quality control content and feasibility of on-site manipulation are put into overall consideration. Based on content and checklist of on-site quality control in National 11th Five-Year Plan Project Optimization of Comprehensive Treatment Plan for TCM in Prevention and Treatment of Serious Disease and Clinical Assessment on Generic Technology and Quality Control Research, it is proposed that on-site quality control of acupuncture RCT should be conducted with PICOST (patient, intervention, comparison, out come, site and time) as core, especially on quality control of interveners' skills and outcome assessment of blinding, and checklist of on-site quality control is developed to provide references for undertaking groups of the project.

  13. Risk-based design of process plants with regard to domino effects and land use planning.

    PubMed

    Khakzad, Nima; Reniers, Genserik

    2015-12-15

    Land use planning (LUP) as an effective and crucial safety measure has widely been employed by safety experts and decision makers to mitigate off-site risks posed by major accidents. Accordingly, the concept of LUP in chemical plants has traditionally been considered from two perspectives: (i) land developments around existing chemical plants considering potential off-site risks posed by major accidents and (ii) development of existing chemical plants considering nearby land developments and the level of additional off-site risks the land developments would be exposed to. However, the attempts made to design chemical plants with regard to LUP requirements have been few, most of which have neglected the role of domino effects in risk analysis of major accidents. To overcome the limitations of previous work, first, we developed a Bayesian network methodology to calculate both on-site and off-site risks of major accidents while taking domino effects into account. Second, we combined the results of risk analysis with Analytic Hierarchical Process to design an optimal layout for which the levels of on-site and off-site risks would be minimum. Copyright © 2015 Elsevier B.V. All rights reserved.

  14. Blowout control: Response, intervention and management; Part 2, Logistics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flak, L.H.; Wright, J.W.; Tuppen, J.A.

    1993-12-01

    This paper represents part two of a series regarding the development of emergency response and contingency plans for oil and gas well blowouts. The first paper dealt with developing plans to prevent blowouts and developing blowout task forces to respond when one occurred. This paper deals with the logistics of the transport of personnel and equipment to the blowout site. The paper describes a plan to identify the best sources of personnel, equipment, and services prior to a blowout. Services include methods for establishing emergency billing, cash flow and credit assistance, hazardous duty pay, welding and fabrication equipment, etc. Themore » paper also discusses the need to plan and establish base camps at the blowout sites, the logistics of establishing this base camp, and establishing viable communications to these base camps.« less

  15. Developing a programmatic approach to investigating and remediating many unrelated comprehensive environmental response, compensation, and liability act sites at Kelly Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kamp, G.; Regan, P.; Ninesteel, R.

    1988-01-01

    Kelly Air Force Base (AFB), which was founded in 1917, is involved in logistics and maintenance activities supporting the Air Logistics Command. In addition, Kelly AFB hosts over 50 tenant organizations representing the Air Force, Department of Defense, and other government agencies. Over the years waste disposal from this complex was conducted in a manner that led to the identification of over 30 sites to be included in the Installation Restoration Program (IRP) after the Phase 1 investigation. A methodology was needed to prioritize the Remedial Investigations and Feasibility Study (RI/FS) activities for the sites. A Strategy Plan was developedmore » that involved reviewing and interpreting existing data, identifying data voids relative to site specific RI/FS activities, and developing methodology to prioritize activities. Sites were prioritized, and a comprehensive IRP planning document was developed. One data deficiency was revealed -- the lack of understanding of the Basewide hydrogeologic conditions necessary to establish an effective restoration program. A Hydrogeologic Investigation was initiated to provide this data. This data will allow better interpretation of the interaction of the sites, particularly those in close proximity, and improved planning of remediation activities.« less

  16. Evaluation of components, subsystems, and networks for high rate, high frequency space communications

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert J.; Ivancic, William D.; Zuzek, John E.

    1991-01-01

    The development of new space communications technologies by NASA has included both commercial applications and space science requirements. NASA's Systems Integration, Test and Evaluation (SITE) Space Communication System Simulator is a hardware based laboratory simulator for evaluating space communications technologies at the component, subsystem, system, and network level, geared toward high frequency, high data rate systems. The SITE facility is well-suited for evaluation of the new technologies required for the Space Exploration Initiative (SEI) and advanced commercial systems. Described here are the technology developments and evaluation requirements for current and planned commercial and space science programs. Also examined are the capabilities of SITE, the past, present and planned future configurations of the SITE facility, and applications of SITE to evaluation of SEI technology.

  17. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  18. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less

  19. 42 CFR 73.14 - Incident response.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... under this part must develop and implement a written incident response plan based upon a site specific risk assessment.2 The incident response plan must be coordinated with any entity-wide plans, kept in... response plan must fully describe the entity's response procedures for the theft, loss, or release of a...

  20. 42 CFR 73.14 - Incident response.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... under this part must develop and implement a written incident response plan based upon a site specific risk assessment.2 The incident response plan must be coordinated with any entity-wide plans, kept in... response plan must fully describe the entity's response procedures for the theft, loss, or release of a...

  1. 7 CFR 1924.119 - Site Loans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Site Loans. 1924.119 Section 1924.119 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.119 Site Loans. Subdivisions...

  2. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... specific site. Planning must take into consideration topography, soils, climate, adjacent land use... services, housing and social conditions, and a degree of flexibility to accommodate changing demands. All...

  3. 40 CFR 230.96 - Monitoring.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required for aquatic resources with slow development rates (e.g., forested wetlands, bogs). Following..., and may include plans (such as as-built plans), maps, and photographs to illustrate site conditions...

  4. SMART GUIDANCE AND SMARTE - TOOLS FOR DEVELOPING SITE SPECIFIC REDEVELOPMENT PLANS

    EPA Science Inventory

    Site-specific Management Approaches and Redevelopment Tools (SMART) Guidance and its electronic counterpart, SMARTe are being developed jointly with the German Federal Ministry of Education and Research and the Interstate Technology Regulatory Council. These products will assist ...

  5. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  6. Maritime Spatial Planning supported by systematic site selection: Applying Marxan for offshore wind power in the western Baltic Sea

    PubMed Central

    Dahl, Karsten; Mohn, Christian

    2018-01-01

    The development of offshore wind energy and other competing interests in sea space are a major incentive for designating marine and coastal areas for specific human activities. Maritime Spatial Planning (MSP) considers human activities at sea in a more integrated way by analysing and designating spatial and temporal distributions of human activities based on ecological, economic and social targets. However, specific tools supporting spatial decisions at sea incorporating all relevant sectors are rarely adopted. The decision support tool Marxan is traditionally used for systematic selection and designation of nature protection and conservation areas. In this study, Marxan was applied as a support tool to identify suitable sites for offshore wind power in the pilot area Pomeranian Bight / Arkona Basin in the western Baltic Sea. The software was successfully tested and scenarios were developed that support the sites indicated in existing national plans, but also show options for alternative developments of offshore wind power in the Pomeranian Bight / Arkona Basin area. PMID:29543878

  7. Wyoming's industrial siting permit process and environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Hyman, Eric L.

    1982-01-01

    The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.

  8. Introduction to Soil Fumigant Management Plans

    EPA Pesticide Factsheets

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  9. Tracking the Short Term Planning (STP) Development Process

    NASA Technical Reports Server (NTRS)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  10. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  11. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less

  12. Effectiveness of participatory planning for community management of fisheries in Bangladesh.

    PubMed

    Sultana, Parvin; Abeyasekera, Savitri

    2008-01-01

    This study provides statistical evidence that support for community-based management of resources was more effective when initiated through a process known as participatory action plan development (PAPD). Thirty-six sites were studied where community management of fisheries was facilitated by NGOs. All involved community participation and establishing local fisheries management institutions. However, communities were able to take up more conservation-related interventions and faced fewer conflicts in the 18 sites where a PAPD was the basis for collective action and institution development. This indicates the value and effectiveness of adopting good practice in participatory planning, such as PAPD, which helps diverse stakeholders find common problems and solutions for natural resource management.

  13. Site-Based Management: Crisis or Opportunity?

    ERIC Educational Resources Information Center

    Lausberg, Clement H.

    1990-01-01

    If appropriate planning occurs, business officials can support site-based management. Districts need to develop new working relationships that appropriately balance the responsibility of the business office for district finances and support services with more site-based management at the school level. (MLF)

  14. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  15. Use of protected activity centers by Mexican Spotted Owls in the Sacramento Mountains, New Mexico

    Treesearch

    Joseph L. Ganey; James P. Ward; Jeffrey S. Jenness; William M. Block; Shaula Hedwall; Ryan S. Jonnes; Darrell L. Apprill; Todd A. Rawlinson; Sean C. Kyle; Steven L. Spangle

    2014-01-01

    A Recovery Plan developed for the threatened Mexican Spotted Owl (Strix occidentalis lucida) recommended designating Protected Activity Centers (PACs) with a minimum size of 243 ha to conserve core use areas of territorial owls. The plan assumed that areas of this size would protect " the nest site, several roost sites, and the most proximal and highly-used...

  16. The On-Site, Programmatic Approach to Staff Development.

    ERIC Educational Resources Information Center

    Collins, Charles C.; Case, Chester H.

    At present, community college in-service professional development programs are not top quality. Little, if any, budgetary support is allocated for them, and responsibility for planning and carrying them out is allocated to no one in particular. The few on-site in-service professional development programs now in operation exhibit common elements…

  17. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater

    NASA Astrophysics Data System (ADS)

    Heldmann, Jennifer L.; Colaprete, Anthony; Elphic, Richard C.; Bussey, Ben; McGovern, Andrew; Beyer, Ross; Lees, David; Deans, Matt

    2016-10-01

    Studies of lunar polar volatile deposits are of interest for scientific purposes to understand the nature and evolution of the volatiles, and also for exploration reasons as a possible in situ resource to enable long term human exploration and settlement of the Moon. Both theoretical and observational studies have suggested that significant quantities of volatiles exist in the polar regions, although the lateral and horizontal distribution remains unknown at the km scale and finer resolution. A lunar polar rover mission is required to further characterize the distribution, quantity, and character of lunar polar volatile deposits at these higher spatial resolutions. Here we present a case study for NASA's Resource Prospector (RP) mission concept for a lunar polar rover and utilize this mission architecture and associated constraints to evaluate whether a suitable landing site exists to support an RP flight mission. We evaluate the landing site criteria to characterize the Haworth Crater region in terms of expected hydrogen abundance, surface topography, and prevalence of shadowed regions, as well as solar illumination and direct to Earth communications as a function of time to develop a notional rover traverse plan that addresses both science and engineering requirements. We also present lessons-learned regarding lunar traverse path planning focusing on the critical nature of landing site selection, the influence of illumination patterns on traverse planning, the effects of performing shadowed rover operations, the influence of communications coverage on traverse plan development, and strategic planning to maximize rover lifetime and science at end of mission. Here we present a detailed traverse path scenario for a lunar polar volatiles rover mission and find that the particular site north of Haworth Crater studied here is suitable for further characterization of polar volatile deposits.

  18. Advanced planning for ISS payload ground processing

    NASA Astrophysics Data System (ADS)

    Page, Kimberly A.

    2000-01-01

    Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .

  19. Autonomous path-planning navigation system for site characterization

    NASA Astrophysics Data System (ADS)

    Rankin, Arturo L.; Crane, Carl D., III; Armstrong, David G., II; Nease, Allen D.; Brown, H. Edward

    1996-05-01

    The location and removal of buried munitions is an important yet hazardous task. Current development is aimed at performing both the ordnance location and removal tasks autonomously. An autonomous survey vehicle (ASV) named the Gator has been developed at the Center for Intelligent Machines and Robotics, under the direction of Wright Laboratory, Tyndall Air Force Base, Florida, and the Navy Explosive Ordnance Disposal Technology Division, Indian Head, Maryland. The primary task of the survey vehicle is to autonomously traverse an off-road site, towing behind it a trailer containing a sensor package capable of characterizing the sub-surface contents. Achieving 00 percent coverage of the site is critical to fully characterizing the site. This paper presents a strategy for planning efficient paths for the survey vehicle that guarantees near-complete coverage of a site. A small library of three in-house developed path planners are reviewed. A strategy is also presented to keep the trailer on-path and to calculate the percent of coverage of a site with a resolution of 0.01 m2. All of the algorithms discussed in this paper were initially developed in simulation on a Silicon Graphics computer and subsequently implemented on the survey vehicle.

  20. System architecture for asynchronous multi-processor robotic control system

    NASA Technical Reports Server (NTRS)

    Steele, Robert D.; Long, Mark; Backes, Paul

    1993-01-01

    The architecture for the Modular Telerobot Task Execution System (MOTES) as implemented in the Supervisory Telerobotics (STELER) Laboratory is described. MOTES is the software component of the remote site of a local-remote telerobotic system which is being developed for NASA for space applications, in particular Space Station Freedom applications. The system is being developed to provide control and supervised autonomous control to support both space based operation and ground-remote control with time delay. The local-remote architecture places task planning responsibilities at the local site and task execution responsibilities at the remote site. This separation allows the remote site to be designed to optimize task execution capability within a limited computational environment such as is expected in flight systems. The local site task planning system could be placed on the ground where few computational limitations are expected. MOTES is written in the Ada programming language for a multiprocessor environment.

  1. Planned residential units: New development trajectories

    NASA Astrophysics Data System (ADS)

    Fedchenko, Irina

    2017-01-01

    The paper summarizes the transformation patterns of functional, morphological, social, and administrative structures of planned residential units - district (Russia, Eastern Europe), neighborhood (USA), community (UK, Europe), as the smallest structural and planning elements of the settlements. The study is based on the author's own on-site survey of the existing and new planned residential units, as well as on the analysis of theoretical sources. The multidisciplinary analysis of the theoretical concepts and on-site survey results showed that planned residential units formed in the early twentieth century retain their social and planning importance and identity, evolve and acquire new features and forms. At the same time, according to the current regulatory and legal instruments they remain basic planning elements of urban structure in the early twenty-first century. This paper also includes experimental analysis of the theoretical concepts of planned residential units' transformation, their conceptual planning model and formation principles in the early twenty-first century.

  2. Planning riparian restoration in the context of tamarix control in Western North America

    USGS Publications Warehouse

    Shafroth, P.B.; Beauchamp, Vanessa B.; Briggs, M.K.; Lair, K.; Scott, M.L.; Sher, A.A.

    2008-01-01

    Throughout the world, the condition of many riparian ecosystems has declined due to numerous factors, including encroachment of non-native species. In the western United States, millions of dollars are spent annually to control invasions of Tamarix spp., introduced small trees or shrubs from Eurasia that have colonized bottomland ecosystems along many rivers. Resource managers seek to control Tamarix in attempts to meet various objectives, such as increasing water yield and improving wildlife habitat. Often, riparian restoration is an implicit goal, but there has been little emphasis on a process or principles to effectively plan restoration activities, and many Tamarix removal projects are unsuccessful at restoring native vegetation. We propose and summarize the key steps in a planning process aimed at developing effective restoration projects in Tamarix-dominated areas. We discuss in greater detail the biotic and abiotic factors central to the evaluation of potential restoration sites and summarize information about plant communities likely to replace Tamarix under various conditions. Although many projects begin with implementation, which includes the actual removal of Tamarix, we stress the importance of pre-project planning that includes: (1) clearly identifying project goals; (2) developing realistic project objectives based on a detailed evaluation of site conditions; (3) prioritizing and selecting Tamarix control sites with the best chance of ecological recovery; and (4) developing a detailed tactical plan before Tamarix is removed. After removal, monitoring and maintenance as part of an adaptive management approach are crucial for evaluating project success and determining the most effective methods for restoring these challenging sites. ?? 2008 Society for Ecological Restoration International.

  3. Site characterization progress report: Yucca Mountain, Nevada, October 1, 1994--March 31, 1995, Number 12. Nuclear Waste Policy Act (Section 113)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less

  4. Accidental Release of Chlorine from a Storage Facility and an On-Site Emergency Mock Drill: A Case Study

    PubMed Central

    Soman, Ambalathumpara Raman; Sundararaj, Gopalswamy

    2015-01-01

    In the current industrial scenario there is a serious need for formulating strategies to handle hazardous substances in the safest way. Manufacture, storage, and use of hazardous substances pose a serious risk to industry, people, and the environment. Accidental release of toxic chemicals can lead to emergencies. An emergency response plan (ERP) is inevitable to minimize the adverse effects of such releases. The on-site emergency plan is an integral component of any process safety and risk management system. This paper deals with an on-site emergency response plan for a chlorine manufacturing industry. It was developed on the basis of a previous study on chlorine release and a full scale mock drill has been conducted for testing the plan. Results indicated that properly trained personnel can effectively handle each level of incidents occurring in the process plant. As an extensive guideline to the district level government authorities for off-site emergency planning, risk zone has also been estimated with reference to a chlorine exposure threshold of 3 ppm. PMID:26171416

  5. ENGINEERING ASPECTS OF COLLEGE PLANT DESIGN.

    ERIC Educational Resources Information Center

    DALTON, LIAM F.; SEGNER, MARVIN

    THE ARTICLE FOCUSES ON MECHANICAL AND ELECTRICAL FACILITIES THAT SHOULD BE CONSIDERED WHEN DEVELOPING A LONG RANGE MASTER PLAN. DEVELOPMENT OF THE MASTER PLAN SHOULD CONSIDER THE FOLLOWING--(1) COMPARATIVE FUEL COSTS, (2) POWER DISTRIBUTION, (3) HEATING PLANT, (4) CENTRAL PLANT SITE, (5) COOLING PLANT, (6) WATER SUPPLY, (7) STORM DRAINAGE, (8)…

  6. 76 FR 9596 - General Management Plan, Final Environmental Impact Statement, Cedar Creek and Belle Grove...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... will provide guidance to park management for administration, development, and interpretation of park... request, and on the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning.nps.gov... development and future management of the National Historical Park. Alternative A (Continuation of Current...

  7. Strategic Planning: A (Site) Sight-Based Approach to Curriculum and Staff Development.

    ERIC Educational Resources Information Center

    Johnson, Daniel P.

    The purpose of (Colorado's) Clear Creek School District's strategic planning process has been to develop basic district-wide parameters to promote instructional improvement through a process of shared leadership. The approach is termed "sight-based" to indicate the school district's commitment to connecting curriculum and…

  8. Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uhlmeyer, Terri; Thompson, Randy; Starr, Ken

    2013-07-01

    The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws,more » Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)« less

  9. Conserving and Enhancing the Natural Environment: A Guide for Planning, Design, Construction, and Maintenance on New & Existing School Sites.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore. School Facilities Branch.

    Natural environments on school sites provide considerable multi-disciplinary educational opportunities, many of which are "hands-on" experiences that stimulate learning. This document presents guidelines on conserving and enhancing the natural environment on school sites. It provides guidance for developing the site requirements in…

  10. 43 CFR 11.32 - How does the authorized official develop the Assessment Plan?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...

  11. 43 CFR 11.32 - How does the authorized official develop the Assessment Plan?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...

  12. 43 CFR 11.32 - How does the authorized official develop the Assessment Plan?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...

  13. PLANNING THE COMMUNITY COLLEGE.

    ERIC Educational Resources Information Center

    1967

    A COMMUNITY COLLEGE MASTER PLAN (1) SHOULD BE UNIQUE, DESIGNED FOR ITS PARTICULAR SITUATION, (2) DEVELOPS FROM AN ANALYSIS OF NEEDS, SITE, GROWTH, AND FINANCE, (3) STARTS WITH A REVIEW OF FACTS, RESOURCES, NEEDS, AND INFLUENCES, TO GIVE A FOUNDATION FOR THE CREATIVE PLANNING PROCESS, AND (4) IS INFLUENCED BY FACTORS OF EDUCATIONAL PROGRAM,…

  14. National Agenda: A Holistic Approach towards Development of the Campus Improvement Plan Using "Ways of Knowing through the Realms of Meaning" as the Framework

    ERIC Educational Resources Information Center

    Cloud, Michelle; Kritsonis, William Allan

    2006-01-01

    This article seeks to examine "Ways of Knowing Through the Realms of Meaning" (2007) by Dr. William Allan Kritsonis as a framework that transformational educational leaders can use to guide members of the Site Based Decision Making Team through development of the Campus Improvement Plan. The Campus Improvement Plan serves as a blueprint for…

  15. 40 CFR 63.1965 - What is a deviation?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the landfill monitoring and SSM plan requirements, deviations include the items in paragraphs (a.... (c) A deviation occurs when a SSM plan is not developed or maintained on site. [68 FR 2238, Jan. 16...

  16. 40 CFR 63.1965 - What is a deviation?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the landfill monitoring and SSM plan requirements, deviations include the items in paragraphs (a.... (c) A deviation occurs when a SSM plan is not developed or maintained on site. [68 FR 2238, Jan. 16...

  17. Remediation plans in family medicine residency

    PubMed Central

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  18. National Wetland Mitigation Banking Study. Commercial Wetland Mitigation Credit Markets: Theory and Practice.

    DTIC Science & Technology

    1995-11-01

    based on established and incentive for Delta compliance. functioning replacement wetlands. Perhaps the most compelling reason given for why The permit...developed mitigation plans powerful incentive for ventures to carefully site, for the Cricket Creek site in accordance with the plan, and execute the...Opportunity. Lev, Esther (with field assistance by Peter Zika ) for the Lane County Council of Governments, 1988 (revised 1990), Preliminary Inventory of

  19. The Role of the Professional Field Naturalist in Planning Outdoor Education Facilities.

    ERIC Educational Resources Information Center

    Blythe, Chris

    1994-01-01

    Discusses the role of consulting firms in site development for outdoor education centers and recreational camps. Services include inventories of flora and fauna to assess the site's potential for environmental education, and design recommendations to minimize detrimental effects of development on the environment. (LP)

  20. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig

    2013-07-01

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysicsmore » and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)« less

  1. 78 FR 46925 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... Commercial Dock Development Study A. Contract and Project Status B. Overview of draft Dock Development Plan.... Land-side support facilities a. Outer Cove Mariana b. Puerto Rico Dump c. Echo Dock d. Sea Plan Ramp iv. Environmental Consideration and Permits v. Discussion on Preferred Site Location C. Evaluation of Preliminary...

  2. EDUCATIONAL SPECIFICATIONS FOR THE NORTH CAMPUS OF SEATTLE COMMUNITY COLLEGE.

    ERIC Educational Resources Information Center

    MCGUFFEY, C.W.; AND OTHERS

    THE NORTH CAMPUS IS ONE OF THREE UNITS PROPOSED FOR THE SEATTLE COMMUNITY COLLEGE. A TEAM OF CONSULTANTS AND STAFF COMMITTEES DEVELOPED THIS DESCRIPTION OF THE BASIC EDUCATIONAL REQUIREMENTS FOR THE ARCHITECTURAL PLANNING OF THE CAMPUS. CONSIDERATION WAS GIVEN TO SITE PLANNING AND DEVELOPMENT AND TO FACILITIES FOR ADMINISTRATION, STUDENT PERSONNEL…

  3. LCOE Baseline for OE Buoy

    DOE Data Explorer

    Previsic, Mirko; Karthikeyan, Anantha; Lewis, Tony; McCarthy, John

    2017-07-26

    Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the OE Buoy technology, which is not presently on Ocean Energy's technology development pathway but will be considered in future business plan development. The DOE reference site condition is considered a low power-density site, compared with many of the planned initial deployment locations for the OE Buoy. Many of the sites considered for the initial commercial deployment of the OE buoy feature much higher wave power densities and shorter period waves. Both of these characteristics will improve the OE buoy's commercial viability.

  4. Development and implementation of a scrub habitat compensation plan for Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Schmalzer, Paul A.; Breininger, David R.; Adrian, Frederic W.; Schaub, Ron; Duncan, Brean W.

    1994-01-01

    Kennedy Space Center (KSC), located on Merritt Island on the east coast of central Florida, is one of three remaining major populations of the Florida Scrub Jay (Aphelocoma coerulescens coerulescens), listed as threatened by the U.S. Fish and Wildlife Service (USFWS) since 1987. Construction of new facilities by the National Aeronautics and Space Administration (NASA) on KSC over the next five years has the potential to impact up to 193 ac (78.1 ha) of Scrub Jay habitat. Under an early consultation process with the Endangered Species Office of the USFWS, NASA agreed to a compensation plan for loss of Scrub Jay habitat. The compensation plan required NASA to restore or create scrub on KSC at a 2:1 ratio for that lost. The compensation plan emphasized restoration of scrub habitat that is of marginal or declining suitability to Scrub Jays because it has remained unburned. Although prescribed burning has been conducted by the USFWS Merritt Island National Wildlife Refuge (MINWR) for more than ten years, significant areas of scrub remain unburned because they have been excluded from fire management units or because landscape fragmentation and a period of fire suppression allowed scrub to reach heights and diameters that are fire resistant. For such areas, mechanical cutting followed by prescribed burning was recommended for restoration. A second part of the restoration plan is an experimental study of scrub reestablishment (i.e., creation) on abandoned, well drained agricultural sites by planting scrub oaks and other scrub plants. The compensation plan identified 260 ac (105 ha) of scrub restoration in four areas and a 40 ac (16 ha) scrub creation site. Monitoring of restoration sites required under the plan included: establishing permanent vegetation sample transects before treatment and resampling annually for ten years after treatment, and color banding Scrub Jays to determine territories prior to treatment followed by monitoring reproductive success and survival for ten years after treatment. Monitoring scrub creation sites included determining survival of planted material for five years and establishing permanent transects to follow vegetation development for ten years after planting. Scrub Jay monitoring of creation sites is incorporated with that of adjacent restoration sites.

  5. 10 CFR 72.200 - Provision of MRS information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... regarding determinations or plans made by the Commission with respect to siting, development, design... Web site, http://www.nrc.gov, and/or at the NRC Public Document Room, and must be furnished to DOE...

  6. Managing Stormwater and Dust at Demolition Sites

    EPA Pesticide Factsheets

    Learn how to manage stormwater and dust at demolition sites, including developing a stormwater solution prevention plan, best practices for erosion, runoff and sediment control to reduce environmental impacts and comply with environmental regulations.

  7. A Multi-criteria Decision Analysis System for Prioritizing Sites and Types of Low Impact Development Practices

    NASA Astrophysics Data System (ADS)

    Song, Jae Yeol; Chung, Eun-Sung

    2017-04-01

    This study developed a multi-criteria decision analysis framework to prioritize sites and types of low impact development (LID) practices. This framework was systemized as a web-based system coupled with the Storm Water Management Model (SWMM) from the Environmental Protection Agency (EPA). Using the technique for order of preference by similarity to ideal solution (TOPSIS), which is a type of multi-criteria decision-making (MCDM) method, multiple types and sites of designated LID practices are prioritized. This system is named the Water Management Prioritization Module (WMPM) and is an improved version of the Water Management Analysis Module (WMAM) that automatically generates and simulates multiple scenarios of LID design and planning parameters for a single LID type. WMPM can simultaneously determine the priority of multiple LID types and sites. In this study, an infiltration trench and permeable pavement were considered for multiple sub-catchments in South Korea to demonstrate the WMPM procedures. The TOPSIS method was manually incorporated to select the vulnerable target sub-catchments and to prioritize the LID planning scenarios for multiple types and sites considering socio-economic, hydrologic and physical-geometric factors. In this application, the Delphi method and entropy theory were used to determine the subjective and objective weights, respectively. Comparing the ranks derived by this system, two sub-catchments, S16 and S4, out of 18 were considered to be the most suitable places for installing an infiltration trench and porous pavement to reduce the peak and total flow, respectively, considering both socio-economic factors and hydrological effectiveness. WMPM can help policy-makers to objectively develop urban water plans for sustainable development. Keywords: Low Impact Development, Multi-Criteria Decision Analysis, SWMM, TOPSIS, Water Management Prioritization Module (WMPM)

  8. View from the top: CEO perspectives on executive development and succession planning practices in healthcare organizations.

    PubMed

    Groves, Kevin S

    2006-01-01

    Many healthcare professionals question whether the industry's hospitals and multi-site systems are implementing the necessary executive development and succession planning systems to ensure that high potential managers are prepared and aptly selected to assume key executive roles. Survey data, case studies, and cross-industry comparisons suggest that healthcare organizations may face a leadership crisis as the current generation of chief executive officers (CEOs) nears retirement while traditional means of developing the leadership pipeline, including middle-management positions and graduate programs requiring formal residencies, continue to dissipate. Given the daunting challenges that accompany the healthcare industry's quest to identify, develop, and retain leadership talent, this article provides best practice findings from a qualitative study of 13 healthcare organizations with a record of exemplary executive development and succession planning practices. CEOs from six single-site hospitals, six healthcare systems, and one medical group were interviewed to identify industry best practices so that healthcare practitioners and educators may utilize the findings to enhance the industry's leadership capacity.

  9. The Epistemography of an Urban and Regional Planning Practicum: Appropriation in the Face of Resistance. WCER Working Paper No. 2010-8

    ERIC Educational Resources Information Center

    Bagley, Elizabeth

    2010-01-01

    In this paper, the author describes an ethnographic study of a graduate-level practicum at a large Midwestern university in order to examine one of the ways urban planners develop expertise. The graduate students in the practicum were guided in the production of a site plan for a developing area by a planner with 34 years of planning experience.…

  10. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  11. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  12. 42 CFR 431.992 - Corrective action plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Estimating Improper Payments in Medicaid and CHIP § 431.992 Corrective action plan. (a) The State agency must develop a separate corrective action plan for Medicaid and CHIP, which is not required to be approved by... which the State's Medicaid or CHIP error rates are posted on the CMS contractor's Web site. (d) The...

  13. 77 FR 64824 - Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ..., operate, maintain and decommission a maximum 350 megawatt (MW) photovoltaic facility and necessary... for renewable energy development. You may submit comments on issues and planning criteria in writing... considered through the plan amendment process to determine the suitability of the site for renewable energy...

  14. Traditional-Aged College Juniors' Career Planning Self-Efficacy: A Case Study

    ERIC Educational Resources Information Center

    Sherman, Dawn C.

    2012-01-01

    The purpose of this single-site case study was to explore and describe traditional-age college juniors' reports of self-efficacy (Bandura, 1997) regarding Career Planning (Barker & Kellen, 1998). More specifically, the career planning confidence levels of college juniors enrolled in a required career development course at a private business…

  15. Health and safety plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cofer, G.H.; Holt, V.L.; Roupe, G.W.

    1993-11-01

    This health and safety plan (HASP) was developed by the members of the Measurement Applications and Development Group of the Health Science Research Division at the Oak Ridge National Laboratory (ORNL). This plan was prepared to ensure that health and safety related items for the Waste Area Grouping (WAG) 2 Remedial Investigation (RI)/Feasibility Study and Site Investigation projects conform with the requirements of 29 CFR 1910.120 (April 18, 1992). The RI Plan calls for the characterization, monitoring, risk assessment, and identification of remedial needs and alternatives that have been structured and staged with short-term and long-term objectives. In early FYmore » 1992, the WAG 2 RI was integrated with the ORNL Environmental Restoration (ER) Site Investigations program in order to achieve the complimentary objectives of the projects more effectively by providing an integrated basis of support. The combined effort was named the WAG 2 Remedial Investigation and Site Investigations Program (WAG 2 RI&SI). The Site Investigation activities are a series of monitoring efforts and directed investigations that support other ER activities by providing information about (1) watershed hydrogeology; (2) contaminants, pathways, and fluxes for groundwater at ORNL; (3) shallow subsurface areas that can act as secondary sources of contaminants; and (4) biological populations and contaminants in biota, in addition to other support and coordination activities.« less

  16. Status of the NASA Micro Pulse Lidar Network (MPLNET): overview of the network and future plans, new version 3 data products, and the polarized MPL

    NASA Astrophysics Data System (ADS)

    Welton, Ellsworth J.; Stewart, Sebastian A.; Lewis, Jasper R.; Belcher, Larry R.; Campbell, James R.; Lolli, Simone

    2018-04-01

    The NASA Micro Pulse Lidar Network (MPLNET) is a global federated network of Micro-Pulse Lidars (MPL) co-located with the NASA Aerosol Robotic Network (AERONET). MPLNET began in 2000, and there are currently 17 long-term sites, numerous field campaigns, and more planned sites on the way. We have developed a new Version 3 processing system including the deployment of polarized MPLs across the network. Here we provide an overview of Version 3, the polarized MPL, and current and future plans.

  17. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less

  18. Sustainable Community Case Study: An Assessment of EPA’s Sustainable Development Plan for Stella, Missouri

    EPA Science Inventory

    In 2006, citizens of Stella, Missouri asked the EPA for technical assistance in demolition and site remediation of an abandoned hospital; and how to redevelop the site to help the community be more sustainable. EPA Region 7 teamed with EPA Office of Research and Development (ORD...

  19. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  20. The High-Energy Astrophysics Learning Center-and More!

    NASA Astrophysics Data System (ADS)

    Whitlock, L. A.

    2006-06-01

    As part of the education outreach efforts at NASA-Goddard's HEASARC (High Energy Astrophysics Science Archive Research Center), we have developed two World Wide Web sites for astronomy and space science education. "StarChild" is a site geared for ages 4-14, and the "High-Energy Astrophysics Learning Center" focuses on ages 14-adult. In both sites, information is presented on a variety of reading and comprehension levels. Interactive activities, movies, and animations are included. The sites have been developed with the participation of, and review by, teachers of all grade levels. The sites are now also being distributed in a CD-ROM format. Development of the sites and our future plans are discussed.

  1. Quarterly report for the NGA FFCA project, July 1--September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributedmore » for review and comment.« less

  2. Mitigating Community Impacts of Energy Development: Some Examples for Coal and Nuclear Generating Plants in the United States.

    ERIC Educational Resources Information Center

    Peelle, Elizabeth

    The Hartsville, Tennessee nuclear reactor site, the coal plant at Wheatland, Wyoming, and the nuclear plant at Skagit, Washington have mitigation plans developed in response to a federal, state, and local regulatory agency, respectively; the three mitigation plans aim at internalizing community-level social costs and benefits during the…

  3. Idaho National Laboratory Site Pollution Prevention Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less

  4. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  5. statement of significance, location map, site plan, landscape plan, site ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    statement of significance, location map, site plan, landscape plan, site sections, evolution of cemetery landscape. - San Francisco National Cemetery, 1 Lincoln Boulevard, San Francisco, San Francisco County, CA

  6. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  7. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  8. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  9. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  10. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  11. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  12. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  13. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  14. 7 CFR 1948.57 - Eligible activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Education plans; and (vi) Subdivision plans. (3) Payment of salaries of professional, technical, and... to undertake tests, make appraisals, and arrange for engineering/architectural services necessary for...) Necessary engineering reports in connection with site development; (7) Payment of costs to undertake tests...

  15. Developing Your School Grounds: A Planning Primer.

    ERIC Educational Resources Information Center

    Clearing, 1998

    1998-01-01

    Describes the planning steps and other practical considerations to establish successful trails, outdoor classrooms, or other environmental education improvements on school grounds. Steps include determining needs and methods for promoting projects, resources, site assessment, property lines, safety, and maintenance. Possible projects described…

  16. Brownfields Waterfront Sustainability Pilot, Allentown PA: Technical Memorandum on Conceptual Design Using Low Impact Development

    EPA Pesticide Factsheets

    This technical memorandum briefly describes the site and the master plan, indicates design constraints considered, specifies recommended LID stormwater techniques and features for sustainable redevelopment of the site, and offers other recommendations.

  17. 40 CFR 63.1960 - How is compliance determined?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... have deviated from the requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68...

  18. 40 CFR 63.1960 - How is compliance determined?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... have deviated from the requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68...

  19. 40 CFR 63.1960 - How is compliance determined?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... have deviated from the requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68...

  20. SCHOOLS OF PRESTRESSED CONCRETE. PLANNING, DESIGN AND CONSTRUCTION OF EDUCATIONAL FACILITIES FOR SCHOOLS AND COLLEGES.

    ERIC Educational Resources Information Center

    LYMAN, ROBERT J.

    THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…

  1. 36 CFR 64.6 - Application procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... site including the type of development to be included in the project (if a site plan is available it... project will have any effect on a site in, or eligible for nomination to the National Register of Historic Places. The comments of the SHPO will be included with the application. (4) Flood Disaster Protection Act...

  2. Cultural Resources Reconnaissance Along the Cheyenne River Arm of Lake Oahe in Dewey, Haakon, Stanley, and Ziebach Counties, South Dakota. Volume 1. Main Report

    DTIC Science & Technology

    1988-03-01

    of site 39ST282................................227 39 Plan of site 39ST283................................230 40 Detailed plans of Features 1 and 2...268 53 Plan of site 39DW64 .............................. 272 54 Plan of Feature 1, site 39DW64 ................... 273 55 Plan of site 39DW65...facing E ........................... 228 46 Site 39ST283, facing NE .......................... 232 47 Detail of Feature 1, site 39ST283, facing NW

  3. Internet marketing 101.

    PubMed

    Miller, Ryan J

    2010-11-01

    In an era when social media sites like YouTube, Facebook, and Twitter dominate the popular press, many surgeons overlook the foundational tactics and strategies necessary for long-term practice development and lead generation on the Internet. This article analyzes common errors made by surgeons during the development and implementation of Web site projects, focusing on the areas of strategy development; domain name identification; site plan creation; design considerations; content development; vendor selection; and launch, promotion, and staff training. The article emphasizes that, because the Web site remains the foundation of a surgeon's branding message, minimizing errors during development and construction is critical, particularly in highly competitive or saturated markets, for today's facial plastic surgery practice. Copyright © 2010 Elsevier Inc. All rights reserved.

  4. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    PubMed

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  5. Cautious but Committed: Moving Toward Adaptive Planning and Operation Strategies for Renewable Energy's Wildlife Implications

    NASA Astrophysics Data System (ADS)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned—creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  6. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  7. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  8. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  9. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  10. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  11. Study of hydraulic power recovery from New Mexico water distribution systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schoenmackers, R.

    1984-02-01

    The results of a survey of New Mexico water distribution systems suitable for hydroelectric power development are reported. The objectives of the survey were to determine the potential for hydraulic power recovery from existing and planned water systems, to identify potential sites, and to study and recommend promising sites for further development. The survey found eleven sites in New Mexico water distribution systems with a total hydroelectric power potential of 736 kilowatts. Seven of these sites, or 439 kilowatts, could be developed immediately, having everything necessary in place but the turbine generator. These sites are located in the Bonito pipelinemore » near Carrizozo (2 sites), Raton, Ruidoso, Santa Fe, Sugarite, and Taos. If all seven sites were developed, the annual energy production could reach 3,800,000 kilowatt hours.« less

  12. STK Integrated Message Production List Editor (SIMPLE) for CEO Operations

    NASA Technical Reports Server (NTRS)

    Trenchard, Mike; Heydorn, James

    2014-01-01

    Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade and replace its mission planning and mission operations software systems, which were developed in the Space Shuttle era of the 1980s and 1990s. The impetuses for this change were the planned transition of all workstations to the Windows 7 64-bit operating system and the desire for more efficient and effective use of Satellite Tool Kit (STK) software required for reliable International Space Station (ISS) Earth location tracking. An additional requirement of this new system was the use of the same SQL database of CEO science sites from the SMMS, which was also being developed. STK Integrated Message Production List Editor (SIMPLE) is the essential, all-in-one tool now used by CEO staff to perform daily ISS mission planning to meet its requirement to acquire astronaut photography of specific sites on Earth. The sites are part of a managed, long-term database that has been defined and developed for scientific, educational, and public interest. SIMPLE's end product is a set of basic time and location data computed for an operator-selected set of targets that the ISS crew will be asked to photograph (photography is typically planned 12 to 36 hours out). The CEO operator uses SIMPLE to (a) specify a payload operations planning period; (b) acquire and validate the best available ephemeris data (vectors) for the ISS during the planning period; (c) ingest and display mission-specific site information from the CEO database; (d) identify and display potential current dynamic event targets as map features; (e) compute and display time and location information for each target; (f) screen and select targets based on known crew availability constraints, obliquity constraints, and real-time evaluated constraints to target visibility due to illumination (sun elevation) and atmospheric conditions (weather); and finally (g) incorporate basic, computed time and location information for each selected target into the daily CEO Target List product (message) for submission to ISS payload planning and integration teams for their review and approval prior to uplink. SIMPLE requires and uses the following resources: an ISS mission planning period Greenwich Mean Time start date/time and end date/time), the best available ISS mission ephemeris data (vectors) for that planning period, the STK software package configured for the ISS, and an ISS mission-specific subset of the CEO sites database. The primary advantages realized by the development and implementation of SIMPLE into the CEO payload operations support activity are a smooth transition to the Windows 7 operating system upon scheduled workstation refresh; streamlining of the input and verification of the current ISS ephemeris (vector data); seamless incorporation of selected contents of the SQL database of science sites; the ability to tag and display potential dynamic event opportunities on orbit track maps; simplification of the display and selection of encountered sites based on crew availability, illumination, obliquity, and weather constraints; the incorporation of high-quality mapping of the Earth with various satellite-based datasets for use in describing targets; and the ability to encapsulate and export the essential selected target elements in XML format for use by onboard Earth-location systems, such as Worldmap. SIMPLE is a carefully designed and crafted in-house software package that includes detailed help files for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in May 2012.

  13. Sustainable Impact of Landfill Siting towards Urban Planning in Malaysia

    NASA Astrophysics Data System (ADS)

    Sin Tey, Jia; Goh, Kai Chen; Ern Ang, Peniel Soon

    2017-10-01

    Landfill is one of the most common, widely used waste management technique in Malaysia. The ever increasing of solid waste has made the role of landfill become prominent despite the negative impacts that caused by the landfill is unavoidable. The public and government regulations are getting more aware with the negative impacts that could be brought by the landfill towards the community. It led to the cultural shift to integrate the concept of sustainability into the planning of siting a landfill in an urban area. However, current urban planning tends to emphasize more on the environmental aspect instead of social and economic aspects. This is due to the existing planning guidelines and stakeholder’s understandings are more on the environmental aspect. This led to the needs of incorporating the concept of sustainability into the urban planning. Thus, this paper focuses on the industry stakeholders view on the negative impacts that will cause by the landfill towards the urban planning. The industry stakeholders are those who are related to the decision-making in the selection of a landfill site in the government department. The scope of the study is within the country of Malaysia. This study was conducted through the semi-structured interviews with a total of fifteen industry stakeholders to obtain their perspective on the issues of impacts of siting a landfill in the urban area. The data obtained was analysed using the software, QSR NVivo version 10. Results indicate that landfill bought significant sustainability-related impacts towards landfill siting in urban planning. The negative impacts stated by the respondents are categorized under all three sustainable aspects such as environmental, social and economic. Among the results are such as the pollution, such as the generation of leachate, the objection in siting a landfill site against by the public, and the negotiating and getting money contribution from local authorities. The results produced can be served as a guideline for the industry stakeholders to have a holistic overview of the impacts that could lead by the landfill in siting into the urban area in terms of sustainability aspects. Moreover, it serves as a platform for the developing a holistic guideline for urban planning in the consideration of sustainability aspect of the selection for a landfill site.

  14. Remedial Action Report for Operable Units 6-05 and 10-04, Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    R. P. Wells

    2007-08-15

    This Phase III remedial action report addresses the remediation of lead-contaminated soils found at the Security Training Facility STF-02 Gun Range at the Idaho National Laboratory Site. Phase I, consisting of developing and implementing institutional controls at Operble Unit 10-04 sites and developing and implementing Idaho National Laboratory Site-wide plans for both institutional controls and ecological monitoring, was addressed in a previous report. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase IV will remediate hazards from unexploded ordnance.

  15. Upper Mississippi River Land Use Allocation Plan. Master Plan for Public Use Development and Resource Management. Parts 1 and 2.

    DTIC Science & Technology

    1983-09-01

    many broad-based and long- associated with the Upper Mississippi les of such problems include increasing water quality issues, balancing growth 1...farther west. In the pioneer the end of the St. Paul District portion sites (disturbed sites without previous growth where Mississippi River. species of...have a high water table in lower areas. The percolation rate is generally less than 10 minutes per inch. These *soils tend to be acid and low in

  16. 40 CFR 63.1960 - How is compliance determined?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68 FR 2238, Jan. 16, 2003, as...

  17. 40 CFR 63.1960 - How is compliance determined?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements of this subpart. Finally, you must develop a written SSM plan according to the provisions in 40 CFR 63.6(e)(3). A copy of the SSM plan must be maintained on site. Failure to write or maintain a copy of the SSM plan is a deviation from the requirements of this subpart. [68 FR 2238, Jan. 16, 2003, as...

  18. Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CAMPBELL, L.R.

    1999-09-29

    This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.

  19. A Meta-Analysis of Urban Climate Change Adaptation Planning in the U.S.

    EPA Science Inventory

    The concentration of people, infrastructure, and ecosystem services in urban areas make them prime sites for climate change adaptation. While advances have been made in developing frameworks for adaptation planning and identifying both real and potential barriers to action, empir...

  20. 75 FR 54163 - Notice of Availability: Notice of Funding Availability (NOFA) for the Fiscal Year (FY) 2009...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... the availability on its Web site of the applicant information, submission deadlines, funding criteria... funding for architectural and engineering work, site control, and other planning related expenses that are... using the Department of Housing and Urban Development agency link on the Grants.gov/Find Web site at...

  1. A Sourcebook for the Interpretation of Traditional Dance By Outdoor Museums and Historic Sites.

    ERIC Educational Resources Information Center

    Alm, Jan

    This publication will help historic sites and museums plan and develop programs of traditional dance interpretation. Outdoor museums and historic sites are increasingly involved with the interpretation of social and emotional life. Because it is a social and emotional event, dance can be a valuable part of this interpretation. There are four steps…

  2. 75 FR 6625 - Dixie National Forest, UT, Kitty Hawk Administrative Site Master Development Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... site. Preliminary analysis found that the presence of Utah prairie dogs (a Threatened species) on the... scoping and internal resource analyses: The site has Utah prairie dog habitat and a colony of prairie dogs... and Wildlife Service have concluded that the prairie dog habitat will be adversely affected by the...

  3. Wave Resource Characterization at US Wave Energy Converter (WEC) Test Sites

    NASA Astrophysics Data System (ADS)

    Dallman, A.; Neary, V. S.

    2016-02-01

    The US Department of Energy's (DOE) Marine and Hydrokinetic energy (MHK) Program is supporting a diverse research and development portfolio intended to accelerate commercialization of the marine renewable industry by improving technology performance, reducing market barriers, and lowering the cost of energy. Wave resource characterization at potential and existing wave energy converter (WEC) test sites and deployment locations contributes to this DOE goal by providing a catalogue of wave energy resource characteristics, met-ocean data, and site infrastructure information, developed utilizing a consistent methodology. The purpose of the catalogue is to enable the comparison of resource characteristics among sites to facilitate the selection of test sites that are most suitable for a developer's device and that best meet their testing needs and objectives. It also provides inputs for the design of WEC test devices and planning WEC tests, including the planning of deployment and operations and maintenance. The first edition included three sites: the Pacific Marine Energy Center (PMEC) North Energy Test Site (NETS) offshore of Newport, Oregon, the Kaneohe Bay Naval Wave Energy Test Site (WETS) offshore of Oahu, HI, and a potential site offshore of Humboldt Bay, CA (Eureka, CA). The second edition was recently finished, which includes five additional sites: the Jennette's Pier Wave Energy Converter Test Site in North Carolina, the US Army Corps of Engineers (USACE) Field Research Facility (FRF), the PMEC Lake Washington site, the proposed PMEC South Energy Test Site (SETS), and the proposed CalWave Central Coast WEC Test Site. The operational sea states are included according to the IEC Technical Specification on wave energy resource assessment and characterization, with additional information on extreme sea states, weather windows, and representative spectra. The methodology and a summary of results will be discussed.

  4. 24 CFR 941.606 - Proposal.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Life cycle analysis. For new construction and substantial rehabilitation, the criteria to be used in equipping the proposed development with heating and cooling systems, which shall include a life-cycle cost... the proposed site, site plan, and neighborhood. (f) Market analysis. An analysis of the projected...

  5. Characterization of U.S. Wave Energy Converter (WEC) Test Sites: A Catalogue of Met-Ocean Data, 2nd Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ann R. Dallman; Neary, Vincent S.

    This report presents met-ocean data and wave energy characteristics at eight U.S. wave energy converter (WEC) test and potential deployment sites. Its purpose is to enable the comparison of wave resource characteristics among sites as well as the selection of test sites that are most suitable for a developer's device and that best meet their testing needs and objectives. It also provides essential inputs for the design of WEC test devices and planning WEC tests, including the planning of deployment, and operations and maintenance. For each site, this report catalogues wave statistics recommended in the International Electrotechnical Commission Technical Specimore » cation (IEC 62600-101 TS) on Wave Energy Characterization, as well as the frequency of occurrence of weather windows and extreme sea states, and statistics on wind and ocean currents. It also provides useful information on test site infrastructure and services.« less

  6. Site remediation considerations and foundation excavation plan for the Walter Reed Army Institute of Research building, Forest Glen, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hambley, D.F.; Harrison, W.; Foster, S.A.

    1991-04-01

    The US Army Corps of Engineers North Atlantic Division, Baltimore District (CENAB), intends to design and construct a medical and dental research facility for the Walter Reed Army Institute of Research (WRAIR) at the Walter Reed Army Medical Center (WRAMC) at Forest Glen, Maryland. Because almost 100% of the proposed building site is located on an uncontrolled landfill that was thought to possibly contain medical, toxic, radioactive, or hazardous waste, it was assumed that remediation of the site might be necessary prior to or in conjunction with excavation. To assess (1) the need for remediation and (2) the potential hazardsmore » to construction workers and the general population, the Baltimore District contracted with Argonne National Laboratory to undertake a site characterization and risk assessment and to develop a foundation-excavation plan. The results of the site characterization and a qualitative risk assessment have been presented in a previous report. This report presents the foundation-excavation plan. 38 refs., 16 figs., 11 tabs.« less

  7. Building foundations for the future: the NHS Scotland advanced practice succession planning development pathway.

    PubMed

    Currie, Kay; Grundy, Maggie

    2011-10-01

    To highlight implications for managers from the implementation of a national advanced practice succession planning development pathway within Scotland. Internationally, advanced practice posts have often developed in an ad-hoc manner, with little organizational attention to succession planning. Evaluation of a pilot national succession planning development pathway identified mechanisms which facilitate or hamper effective planning for advanced practice roles. A responsive evaluation design incorporating semi-structured questionnaires to pathway participants (n = 15) and semi-structured telephone interviews with case-site pathway participants (n = 7) and their line managers. Managers believed the development pathway was worthwhile; however, there was limited strategic planning to match individuals' development to service need. Practitioners generally perceived managers as interested in their development, although levels of practical support varied. There is concern from both managers and practitioners regarding ongoing funding for advanced practice development. The present evaluation study reiterates the need for organizational commitment to succession planning including robust service needs analysis mechanisms and adequate funding for development processes. Nurse managers are viewed as the 'gatekeepers' to opportunities for developing advanced nurse practitioners; scare resources must be targeted effectively to support succession planning through the development of selected individuals for future advanced practice posts, justified by service need. © 2011 Blackwell Publishing Ltd.

  8. Using abiotic variables to predict importance of sites for species representation.

    PubMed

    Albuquerque, Fabio; Beier, Paul

    2015-10-01

    In systematic conservation planning, species distribution data for all sites in a planning area are used to prioritize each site in terms of the site's importance toward meeting the goal of species representation. But comprehensive species data are not available in most planning areas and would be expensive to acquire. As a shortcut, ecologists use surrogates, such as occurrences of birds or another well-surveyed taxon, or land types defined from remotely sensed data, in the hope that sites that represent the surrogates also represent biodiversity. Unfortunately, surrogates have not performed reliably. We propose a new type of surrogate, predicted importance, that can be developed from species data for a q% subset of sites. With species data from this subset of sites, importance can be modeled as a function of abiotic variables available at no charge for all terrestrial areas on Earth. Predicted importance can then be used as a surrogate to prioritize all sites. We tested this surrogate with 8 sets of species data. For each data set, we used a q% subset of sites to model importance as a function of abiotic variables, used the resulting function to predict importance for all sites, and evaluated the number of species in the sites with highest predicted importance. Sites with the highest predicted importance represented species efficiently for all data sets when q = 25% and for 7 of 8 data sets when q = 20%. Predicted importance requires less survey effort than direct selection for species representation and meets representation goals well compared with other surrogates currently in use. This less expensive surrogate may be useful in those areas of the world that need it most, namely tropical regions with the highest biodiversity, greatest biodiversity loss, most severe lack of inventory data, and poorly developed protected area networks. © 2015 Society for Conservation Biology.

  9. From theory to application: using performance measures for contraceptive care in the Title X family planning program.

    PubMed

    Loyola Briceno, Ana Carolina; Kawatu, Jennifer; Saul, Katie; DeAngelis, Katie; Frederiksen, Brittni; Moskosky, Susan B; Gavin, Lorrie

    2017-09-01

    The objective was to describe a Performance Measure Learning Collaborative (PMLC) designed to help Title X family planning grantees use new clinical performance measures for contraceptive care. Twelve Title X grantee-service site teams participated in an 8-month PMLC from November 2015 to June 2016; baseline was assessed in October 2015. Each team documented their selected best practices and strategies to improve performance, and calculated the contraceptive care performance measures at baseline and for each of the subsequent 8 months. PMLC sites implemented a mix of best practices: (a) ensuring access to a broad range of methods (n=7 sites), (b) supporting women through client-centered counseling and reproductive life planning (n=8 sites), (c) developing systems for same-day provision of all methods (n=10 sites) and (d) utilizing diverse payment options to reduce cost as a barrier (n=4 sites). Ten sites (83%) observed an increase in the clinical performance measures focused on most and moderately effective methods (MME), with a median percent change of 6% for MME (from a median of 73% at baseline to 77% post-PMLC). Evidence suggests that the PMLC model is an approach that can be used to improve the quality of contraceptive care offered to clients in some settings. Further replication of the PMLC among other groups and beyond the Title X network will help strengthen the current model through lessons learned. Using the performance measures in the context of a learning collaborative may be a useful strategy for other programs (e.g., Federally Qualified Health Centers, Medicaid, private health plans) that provide contraceptive care. Expanded use of the measures may help increase access to contraceptive care to achieve national goals for family planning. Published by Elsevier Inc.

  10. Oklahoma's Marshall Plan: Combining Professional Development and Summer Writing Camps in Low-Income Elementary Schools. National Writing Project at Work. Volume 1, Number 8

    ERIC Educational Resources Information Center

    Simmons, Eileen

    2004-01-01

    Eileen Simmons, a veteran teacher-consultant from the Oklahoma State University Writing Project, describes collaboration among writing project teacher-consultants and site-based teachers to plan professional development before, during, and after a summer writing camp for students at their school. This model, which has been adapted in a variety of…

  11. Collaborative Lesson Plans.

    ERIC Educational Resources Information Center

    Henrico County Public Schools, Glen Allen, VA. Virginia Vocational Curriculum and Resource Center.

    This collection consists of 41 collaborative lesson plans developed by 99 Virginia teachers at 18 primarily High Schools that Work (HSTW) and tech prep sites. It is divided into three sections: career connection, community connection, and consumer connection. Two types of lesson descriptions which support HSTW key practices, and Virginia's Tech…

  12. Working Together To Prevent Violence.

    ERIC Educational Resources Information Center

    Gauthier, Erin K.; Reynolds, Doug

    1999-01-01

    By cooperating with other district staff, law enforcement, fire and rescue personnel, and social services, educators can prevail over school violence. First steps are developing a well-trained team, an effective crisis-response plan, and an alternative site to accommodate students. Guidelines and Web sites are provided. (MLH)

  13. Hagerstown-Jefferson Township Public Library Internet Web Site.

    ERIC Educational Resources Information Center

    Albertson, Marie

    1997-01-01

    Describes the development of the Hagerstown (Indiana) public library's Web site. Highlights include writing successful grant proposals for funding; software from Microsoft; community support; free community access to the Internet from home computers as well as at the library; problems encountered; and future plans. (LRW)

  14. Spent nuclear fuel project high-level information management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less

  15. PLANNING, PROGRAMMING, DESIGNING THE COMMUNITY COLLEGE, PROCEEDINGS OF A CONFERENCE SPONSORED BY THE COLLEGE OF ARCHITECTURE AND URBAN PLANNING AND THE CENTER FOR THE DEVELOPMENT OF COMMUNITY COLLEGE EDUCATION (UNIVERSITY OF WASHINGTON, APRIL 24-25, 1967).

    ERIC Educational Resources Information Center

    SONDALLE, MARVIN P.

    PARTICIPANTS AT THIS CONFERENCE DEFINED THE ESSENTIAL MAJOR STEPS IN FACILITY PLANNING FOR A NEW CAMPUS AS SITE SELECTION, FINANCIAL PROGRAMMING, CAMPUS PLANNING, AND CONSTRUCTION. THEY ALSO AGREED THAT THE COLLEGE ADMINISTRATION AND THE ARCHITECTURAL STAFF MUST WORK TOGETHER AT EVERY STAGE OF THE PROGRAM. PRESENT TECHNIQUES OF ENROLLMENT…

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Office of Legacy Management (LM) is an integral part of the U.S. Department of Energy’s (DOE’s) strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. LM will work with each site using an integrated team approach to ensure a successful transition. Part of this process will include transition of Government records and information. The Office of Legacy Management Information and Records Management Transition Guidance focuses on LM’s goal to preserve and protect legacy records and information. This guidance document establishes a framework for the transfer ofmore » records management responsibilities for sites transferring to LM. It describes the requirements, responsibilities, and procedures for the efficient and cost-effective transfer of custody, ownership, and management of records and other information products from the transfer site to LM. Records management practices are critical to the functions of Federal agencies because records provide information about, or evidence of, the organization, functions, policies, decisions, procedures, operations, or other activities. Therefore, the information generated by an agency is created, maintained, and dispositioned through records management processes that ensure the appropriate preservation and retrieval of essential information. Because of their intrinsic value, best practices to preserve information and records should be utilized when records are transferred from one organization to another. As the transfer program completes cleanup activities at closure sites, a transitional process will facilitate the transparent shift in the management of site records activities to LM. The roles and responsibilities of the transfer site and/or program and LM described in this document are a necessary foundation for cooperation and coordination and are essential to the successful transition of records and information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.« less

  17. 78 FR 61329 - Revision of the Land Management Plan for the Nantahala and Pisgah National Forests

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... Assessment has been posted to our Web site. We are inviting the public to help us develop a preliminary... following Web site at www.fs.usda.gov/goto/nfsnc/nprevision on September 20, 2013. Public meetings... announced on the Web site cited above. It is anticipated that the Notice of Intent to prepare an...

  18. APPLICATION OF SUSTAINABILITY CRITERIA TO STELLA, MISSOURI-ENVIRONMENTAL PLANNING-PRELIMINARY SITE INFORMATION AND ELEMENTS OF THE MASTER PLAN

    EPA Science Inventory

    Natural systems provide essential goods and services that make human life possible. Because development of the built environment will cumulatively consume natural capital, it is essential that the conditions that maintain natural systems must become the constraints and performanc...

  19. Collaborative Inquiry for Equity: Discipline and Discomfort

    ERIC Educational Resources Information Center

    Winkelman, Peg

    2012-01-01

    In this study the discipline of collaborative inquiry is employed to prepare aspiring administrators to lead for equity. Educational leadership students are required to conduct a site-based collaborative inquiry resulting in an Equity Plan signature assignment. As they develop their Equity Plans, emerging leaders also participate in a…

  20. USE OF INTEGRATED PLANNING TOOLS FOR REVITALIZATION: SMARTE (U.S.) AND START-UP PLAN (GERMANY)

    EPA Science Inventory

    In 2001, the US-German Bilateral Working Group (BWG) identified more than 40 obstacles to site revitalization which occurred in both countries. From 2001-2005, the BWG developed tools and techniques for overcoming these obstacles. Five joint workshops were held on the following r...

  1. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  2. Planning and Marketing: Two Keys to a Recreation Center's Success.

    ERIC Educational Resources Information Center

    Downs, Joseph P.

    1983-01-01

    Indoor recreational facilities in Fairfax County, Virginia, owe their success to (1) development of comprehensive plans, which take into account site location, community needs, area trends, and financing possibilities, and (2) use of continuous marketing strategies. The centers are self-supporting. Each offers a variety of recreation/sports…

  3. West Virginia Geological Survey's role in siting fluidized bed combustion facilities

    USGS Publications Warehouse

    Smith, C.J.; King, Hobart M.; Ashton, K.C.; Kirstein, D.S.; McColloch, G.H.

    1989-01-01

    A project is presented which demonstrates the role of geology in planning and siting a fluidized bed combustion facility. Whenever a project includes natural resource utilization, cooperation between geologists and design engineers will provide an input that could and should save costs, similar to the one stated in our initial premise. Regardless of whether cost reductions stem from a better knowledge of fuel and sorbent availabilities, or a better understanding of the local hydrology, susceptibility to mine-subsidence, or other geologic hazards, the geological survey has a vital role in planning. Input to planning could help the fluidized-bed developer and design-engineer solve some economic questions and stretch the financial resources at their disposal.

  4. Glass Property Models, Constraints, and Formulation Approaches for Vitrification of High-Level Nuclear Wastes at the US Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Dong-Sang

    2015-03-02

    The legacy nuclear wastes stored in underground tanks at the US Department of Energy’s Hanford site is planned to be separated into high-level waste and low-activity waste fractions and vitrified separately. Formulating optimized glass compositions that maximize the waste loading in glass is critical for successful and economical treatment and immobilization of nuclear wastes. Glass property-composition models have been developed and applied to formulate glass compositions for various objectives for the past several decades. The property models with associated uncertainties and combined with composition and property constraints have been used to develop preliminary glass formulation algorithms designed for vitrification processmore » control and waste form qualification at the planned waste vitrification plant. This paper provides an overview of current status of glass property-composition models, constraints applicable to Hanford waste vitrification, and glass formulation approaches that have been developed for vitrification of hazardous and highly radioactive wastes stored at the Hanford site.« less

  5. Development by Design in Colombia: Making Mitigation Decisions Consistent with Conservation Outcomes

    PubMed Central

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition. PMID:24339972

  6. Development by design in Colombia: making mitigation decisions consistent with conservation outcomes.

    PubMed

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition.

  7. Chapter 3: Design of the Saber-Tooth Project.

    ERIC Educational Resources Information Center

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  8. SCHOOL SITES. SELECTION AND DEVELOPMENT.

    ERIC Educational Resources Information Center

    REIDA, G.W.

    CERTAIN CRITICAL CRITERIA SHOULD BE CONSIDERED IN SELECTING THE SCHOOL SITE. IMPORTANT IS THE STUDY OF SUCH FACTORS AS PRESENT AND PROJECTED PUPIL POPULATION, THE SCHOOL MASTER PLAN, MAIN THOROUGHFARES, DWELLINGS, LAND USE, SOILS, (SHOWN BY SERVICE MAPS), EXISTING SCHOOL FACILITIES AND ATTENDANCE, BOUNDARIES, UTILITY SERVICES AND FLOOD CONTROLS.…

  9. Waste treatability guidance program. User`s guide. Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toth, C.

    1995-12-21

    DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less

  10. Planning and conducting a multi-institutional project on fatigue.

    PubMed

    Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E

    1998-09-01

    To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.

  11. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.« less

  12. Lessons from UNSCOM and IAEA regarding remote monitoring and air sampling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dupree, S.A.

    1996-01-01

    In 1991, at the direction of the United Nations Security Council, UNSCOM and IAEA developed plans for On-going Monitoring and Verification (OMV) in Iraq. The plans were accepted by the Security Council and remote monitoring and atmospheric sampling equipment has been installed at selected sites in Iraq. The remote monitoring equipment consists of video cameras and sensors positioned to observe equipment or activities at sites that could be used to support the development or manufacture of weapons of mass destruction, or long-range missiles. The atmospheric sampling equipment provides unattended collection of chemical samples from sites that could be used tomore » support the development or manufacture of chemical weapon agents. To support OMV in Iraq, UNSCOM has established the Baghdad Monitoring and Verification Centre. Imagery from the remote monitoring cameras can be accessed in near-real time from the Centre through RIF communication links with the monitored sites. The OMV program in Iraq has implications for international cooperative monitoring in both global and regional contexts. However, monitoring systems such as those used in Iraq are not sufficient, in and of themselves, to guarantee the absence of prohibited activities. Such systems cannot replace on-site inspections by competent, trained inspectors. However, monitoring similar to that used in Iraq can contribute to openness and confidence building, to the development of mutual trust, and to the improvement of regional stability.« less

  13. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to themore » FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.« less

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallman, Ann Renee; Neary, Vincent Sinclair

    This report presents met - ocean data and wave energy characteristics at three U.S. wave energy converter (WEC) test and potential deployment sites . Its purpose is to enable the compari son of wave resource characteristics among sites as well as the select io n of test sites that are most suitable for a developer's device and that best meet their testing needs and objectives . It also provides essential inputs for the design of WEC test devices and planning WEC tests, including the planning of deployment and op eration s and maintenance. For each site, this report catalogues wavemore » statistics recommended in the (draft) International Electrotechnical Commission Technical Specification (IEC 62600 - 101 TS) on Wave Energy Characterization, as well as the frequency of oc currence of weather windows and extreme sea states, and statistics on wind and ocean currents. It also provides useful information on test site infrastructure and services .« less

  15. Offshore Wind Guidance Document: Oceanography and Sediment Stability (Version 1) Development of a Conceptual Site Model.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Jesse D.; Jason Magalen; Craig Jones

    This guidance document provide s the reader with an overview of the key environmental considerations for a typical offshore wind coastal location and the tools to help guide the reader through a thoro ugh planning process. It will enable readers to identify the key coastal processes relevant to their offshore wind site and perform pertinent analysis to guide siting and layout design, with the goal of minimizing costs associated with planning, permitting , and long - ter m maintenance. The document highlight s site characterization and assessment techniques for evaluating spatial patterns of sediment dynamics in the vicinity of amore » wind farm under typical, extreme, and storm conditions. Finally, the document des cribe s the assimilation of all of this information into the conceptual site model (CSM) to aid the decision - making processes.« less

  16. Launch vehicle test and checkout plan. - Volume 2: Saturn 1B launch vehicle Skylab R (rescue) and AS-208 flow plan and listings

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The launch operations test and checkout plan is a planning document that establishes all launch site checkout activity, including the individual tests and sequence of testing required to fulfill the development center and KSC test and checkout requirements. This volume contains the launch vehicle test and checkout plan encompassing S-1B, S-4B, IU stage, and ground support equipment tests. The plan is based upon AS-208 flow utilizing a manned spacecraft, LUT 1, and launch pad 39B facilities.

  17. The Lunar Mapping and Modeling Project

    NASA Technical Reports Server (NTRS)

    Noble, Sarah K.; French, R. A.; Nall, M. E.; Muery, K. G.

    2009-01-01

    The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses.

  18. Certification Criteria for Linked Learning Pathways

    ERIC Educational Resources Information Center

    ConnectEd: The California Center for College and Career, 2010

    2010-01-01

    Pathways offer a promising strategy for transforming high schools and improving student outcomes. However, to achieve these desired results, pathways must be of high quality. To guide sites in planning and implementing such pathways, a design team of experts developed the criteria outlined in this document. Sites can choose to go through a…

  19. Rural Housing Site Planning in North Carolina. Agricultural Extension Publication 105.

    ERIC Educational Resources Information Center

    Hester, Randolph T., Jr.; And Others

    Addressing the problems of rural housing site selection and development in North Carolina, this guide is designed for cooperative and coordinated use by: technical assistance personnel employed by the Farmers Home Administration; local lending institutions; Health Departments; the Agricultural Extension Service; the Soil Conservation Service; and…

  20. 77 FR 40030 - Notice of Availability of Draft Environmental Impact Statement for the Proposed Sierra Vista...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... proposed action and alternatives for development of a large-scale, mixed-use, mixed-density master- planned... applicant group's preferred alternative; (c) Reduced Footprint/Increased Density Alternative; (d) Reduced Footprint/Same Density Alternative; (e) Focused Avoidance Alternative; and (f) Southwest Site, an off site...

  1. Automated planning of computer assisted mosaic arthroplasty.

    PubMed

    Inoue, Jiro; Kunz, Manuela; Hurtig, Mark B; Waldman, Stephen D; Stewart, A James

    2011-01-01

    We describe and evaluate a computer algorithm that automatically develops a surgical plan for computer assisted mosaic arthroplasty, a technically demanding procedure in which a set of osteochondral plugs are transplanted from a non-load-bearing area of the joint to the site of a cartilage defect. We found that the algorithm produced plans that were at least as good as a human expert, had less variability, and took less time.

  2. CINRG: Infrastructure for Clinical Trials in Duchenne Dystrophy

    DTIC Science & Technology

    2013-09-01

    research centers sharing a common goal of improving the quality of life of neuromuscular disease patients by cooperative planning , implementation, analysis...discrepancies were noted surrounding the regulatory binder, consent process and data records. The site personnel have a scheduled plan with the CINRG CC...missing long term follow-up visits). The project manager also reviewed the study records to date while onsite. A high priority plan was developed with the

  3. Water-quality assessment of south-central Texas: Occurrence and distribution of volatile organic compounds in surface water and ground water, 1983-94, and implications for future monitoring

    USGS Publications Warehouse

    Ging, P.B.; Judd, L.J.; Wynn, K.H.

    1997-01-01

    The study area of the South-Central Texas study unit of the National Water-Quality Assessment Program comprises the Edwards aquifer in the San Antonio region and its catchment area. The first phase of the assessment includes evaluation of existing water-quality data for surface water and ground water, including volatile organic compounds, to determine the scope of planned monitoring. Most analyses of volatile organic compounds in surface water are from the National Pollutant Discharge Elimination System sites in San Antonio, Texas. Nine volatile organic compounds were detected at the six sites. The three compounds with the most detections at National Pollutant Discharge Elimination System sites are 1,2,4-trimethylbenzene, toluene, and xylene. Analysis of volatile organic compounds in ground water was limited to Edwards aquifer wells. Twenty-eight volatile organic compounds were detected in samples from 89 wells. The five most commonly detected compounds in samples from wells, in descending order, are tetrachloroethene, trichloroethene, bromoform, chloroform, and dibromochloromethane. Detections of volatile organic compounds in surface water and ground water within the South-Central Texas study area are limited to site-specific sources associated with development; therefore, planned monitoring for possible detections of volatile organic compounds as part of the National Water-Quality Assessment Program will emphasize areas of expanding population and development. Monitoring of volatile organic compounds is planned at National Pollutant Discharge Elimination System sites, at basic fixed surface-water sites, and in the ground-water study-unit surveys.

  4. Environmental analysis for development planning in Chambers County, Texas, land use policy component, interim summary of federal influence over land use

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mixon, J.

    1973-11-21

    This summary covers major Federal programs that affect land use and indicates some of the influence which these programs may have on Chambers County, Texas. The first part is divided into specific areas of study and includes the history of Federal assistance programs to date. These areas are housing and urban development, the Rural Development Act of 1972, transportation, mass transit, energy, air pollution controls, the National Environmental Policy Act of 1969; power plant siting, the Environmental Protection Agency (EPA), Coastal Zone Management (CZM), the National Land Use Policy (NLUP) and Planning Assistance Act, and the interrelation of EPA, CZM,more » and NLUP. The second part deals with constitutional power in relation to transportation, housing and slum clearance, urban renewal, Federal assistance for new communities and open space acquisition, the Rural Development Act of 1972, the EPA, CZM, NLUP and Planning Assistance Act, and power plant siting bills. Included are the legislative history of these land use acts and their actual terminology, control and enforcement procedures and research and developing funding. Specific references to Texas, and especially Chambers County, in relation to these programs are made throughout the report.« less

  5. Savannah River Site nuclear materials management plan FY 2017-2031

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, V.

    The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less

  6. Climate Change Resilience Planning at the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.; Johnson, A.

    2015-12-01

    The Savannah River National Laboratory (SRNL) is developing a site sustainability plan for the Department of Energy's Savannah River Site (SRS) in South Carolina in accordance with Executive Order 13693, which charges each DOE agency with "identifying and addressing projected impacts of climate change" and "calculating the potential cost and risk to mission associated with agency operations". The plan will comprise i) projections of climate change, ii) surveys of site managers to estimate the effects of climate change on site operations, and iii) a determination of adaptive actions. Climate change projections for SRS are obtained from multiple sources, including an online repository of downscaled global climate model (GCM) simulations of future climate and downscaled GCM simulations produced at SRNL. Taken together, we have projected data for temperature, precipitation, humidity, and wind - all variables with a strong influence on site operations. SRNL is working to engage site facility managers and facilitate a "bottom up" approach to climate change resilience planning, where the needs and priorities of stakeholders are addressed throughout the process. We make use of the Vulnerability Assessment Scoring Tool, an Excel-based program designed to accept as input various climate scenarios ('exposure'), the susceptibility of assets to climate change ('sensitivity'), and the ability of these assets to cope with climate change ('adaptive capacity'). These are combined to produce a series of scores that highlight vulnerabilities. Working with site managers, we have selected the most important assets, estimated their expected response to climate change, and prepared a report highlighting the most endangered facilities. Primary risks include increased energy consumption, decreased water availability, increased forest fire danger, natural resource degradation, and compromised outdoor worker safety in a warmer and more humid climate. Results of this study will aid in driving future management decisions and promoting sustainable practices at SRS.

  7. Natural Resource Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Green, T.; Schwager, K.

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Naturalmore » Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.« less

  8. Predicting and Mapping Potential Whooping Crane Stopover Habitat to Guide Site Selection for Wind Energy Projects

    EPA Science Inventory

    Migration is one of the most poorly understood components of a bird’s life cycle. For that reason, migratory stopover habitats are often not part of conservation planning and may be overlooked when planning new development projects. This project highlights and addresses an overl...

  9. 15 CFR 921.33 - Boundary changes, amendments to the management plan, and addition of multiple-site components.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management plan, and addition of multiple-site components. 921.33 Section 921.33 Commerce and Foreign Trade... management plan, and addition of multiple-site components. (a) Changes in the boundary of a Reserve and major... management plan shall address goals and objectives for all components of the multi-site Reserve and the...

  10. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilmer, J.

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided,more » this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.« less

  11. Development of a prototype land use model for statewide transportation planning activities : summary.

    DOT National Transportation Integrated Search

    2011-01-01

    Developing computer models of land use and : integrated transportation-land use are high : priorities for Florida transportation planners. : Land use information is fundamental to siting : roadways, signaling, setting maintenance : priorities, routin...

  12. Conservation planning for offsetting the impacts of development: a case study of biodiversity and renewable energy in the Mojave Desert

    USGS Publications Warehouse

    Kreitler, Jason R.; Schloss, Carrie A.; Soong, Oliver; Lee Hannah,; Davis, Frank W.

    2015-01-01

    Balancing society’s competing needs of development and conservation requires careful consideration of tradeoffs. Renewable energy development and biodiversity conservation are often considered beneficial environmental goals. The direct footprint and disturbance of renewable energy, however, can displace species’ habitat and negatively impact populations and natural communities if sited without ecological consideration. Offsets have emerged as a potentially useful tool to mitigate residual impacts after trying to avoid, minimize, or restore affected sites. Yet the problem of efficiently designing a set of offset sites becomes increasingly complex where many species or many sites are involved. Spatial conservation prioritization tools are designed to handle this problem, but have seen little application to offset siting and analysis. To address this need we designed an offset siting support tool for the Desert Renewable Energy Conservation Plan (DRECP) of California, and present a case study of hypothetical impacts from solar development in the Western Mojave subsection. We compare two offset scenarios designed to mitigate a hypothetical 15,331 ha derived from proposed utility-scale solar energy development (USSED) projects. The first scenario prioritizes offsets based precisely on impacted features, while the second scenario offsets impacts to maximize biodiversity conservation gains in the region. The two methods only agree on 28% of their prioritized sites and differ in meeting species-specific offset goals. Differences between the two scenarios highlight the importance of clearly specifying choices and priorities for offset siting and mitigation in general. Similarly, the effects of background climate and land use change may lessen the durability or effectiveness of offsets if not considered. Our offset siting support tool was designed specifically for the DRECP area, but with minor code modification could work well in other offset analyses, and could provide continuing support for a potentially innovative mitigation solution to environmental impacts.

  13. Conservation Planning for Offsetting the Impacts of Development: A Case Study of Biodiversity and Renewable Energy in the Mojave Desert.

    PubMed

    Kreitler, Jason; Schloss, Carrie A; Soong, Oliver; Hannah, Lee; Davis, Frank W

    2015-01-01

    Balancing society's competing needs of development and conservation requires careful consideration of tradeoffs. Renewable energy development and biodiversity conservation are often considered beneficial environmental goals. The direct footprint and disturbance of renewable energy, however, can displace species' habitat and negatively impact populations and natural communities if sited without ecological consideration. Offsets have emerged as a potentially useful tool to mitigate residual impacts after trying to avoid, minimize, or restore affected sites. Yet the problem of efficiently designing a set of offset sites becomes increasingly complex where many species or many sites are involved. Spatial conservation prioritization tools are designed to handle this problem, but have seen little application to offset siting and analysis. To address this need we designed an offset siting support tool for the Desert Renewable Energy Conservation Plan (DRECP) of California, and present a case study of hypothetical impacts from solar development in the Western Mojave subsection. We compare two offset scenarios designed to mitigate a hypothetical 15,331 ha derived from proposed utility-scale solar energy development (USSED) projects. The first scenario prioritizes offsets based precisely on impacted features, while the second scenario offsets impacts to maximize biodiversity conservation gains in the region. The two methods only agree on 28% of their prioritized sites and differ in meeting species-specific offset goals. Differences between the two scenarios highlight the importance of clearly specifying choices and priorities for offset siting and mitigation in general. Similarly, the effects of background climate and land use change may lessen the durability or effectiveness of offsets if not considered. Our offset siting support tool was designed specifically for the DRECP area, but with minor code modification could work well in other offset analyses, and could provide continuing support for a potentially innovative mitigation solution to environmental impacts.

  14. Conservation Planning for Offsetting the Impacts of Development: A Case Study of Biodiversity and Renewable Energy in the Mojave Desert

    PubMed Central

    Kreitler, Jason; Schloss, Carrie A.; Soong, Oliver; Hannah, Lee; Davis, Frank W.

    2015-01-01

    Balancing society’s competing needs of development and conservation requires careful consideration of tradeoffs. Renewable energy development and biodiversity conservation are often considered beneficial environmental goals. The direct footprint and disturbance of renewable energy, however, can displace species’ habitat and negatively impact populations and natural communities if sited without ecological consideration. Offsets have emerged as a potentially useful tool to mitigate residual impacts after trying to avoid, minimize, or restore affected sites. Yet the problem of efficiently designing a set of offset sites becomes increasingly complex where many species or many sites are involved. Spatial conservation prioritization tools are designed to handle this problem, but have seen little application to offset siting and analysis. To address this need we designed an offset siting support tool for the Desert Renewable Energy Conservation Plan (DRECP) of California, and present a case study of hypothetical impacts from solar development in the Western Mojave subsection. We compare two offset scenarios designed to mitigate a hypothetical 15,331 ha derived from proposed utility-scale solar energy development (USSED) projects. The first scenario prioritizes offsets based precisely on impacted features, while the second scenario offsets impacts to maximize biodiversity conservation gains in the region. The two methods only agree on 28% of their prioritized sites and differ in meeting species-specific offset goals. Differences between the two scenarios highlight the importance of clearly specifying choices and priorities for offset siting and mitigation in general. Similarly, the effects of background climate and land use change may lessen the durability or effectiveness of offsets if not considered. Our offset siting support tool was designed specifically for the DRECP area, but with minor code modification could work well in other offset analyses, and could provide continuing support for a potentially innovative mitigation solution to environmental impacts. PMID:26529595

  15. 2010 Annual Summary Report for the Area 3 and Area 5 Radioactive Management Sites at the Nevada National Security Site, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    2011-03-01

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Waste Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2010. This annual summary report presents data and conclusions from the FY 2010 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at themore » Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.« less

  16. Tailoring family planning services to the special needs of adolescents.

    PubMed

    Winter, L; Breckenmaker, L C

    1991-01-01

    Experimental service protocols tailored to the needs of teenage family planning patients were developed that emphasized indepth counseling, education geared to an adolescent's level of development, and the provision of reassurance and social support. These protocols were tested against usual service delivery practices in a study involving 1,261 patients under 18 years of age at six nonmetropolitan family planning clinics. A comparison with teenagers obtaining services at control sites found that six months after their first clinic visit, patients at the experimental sites were more likely to be using a method, were less likely to experience difficulty in dealing with problems, were more likely to continue using their method despite problems and had learned more during the educational session. Teenage patients at the experimental clinics were also less likely to have become pregnant within one year than those who went to control clinics. Attrition during the year following the first study visit was similar among both groups; patient satisfaction was very high, and equivalent at experimental and control sites. The data show that the extra time and effort required to meet the special needs of teenagers is justified by their improved contraceptive use, greater knowledge and lower pregnancy rates.

  17. Space-planning and structural solutions of low-rise buildings: Optimal selection methods

    NASA Astrophysics Data System (ADS)

    Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander

    2017-11-01

    The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.

  18. How to develop a tele-ICU model?

    PubMed

    Rogove, Herb

    2012-01-01

    The concept of the tele-ICU (intensive care unit) is about 30 years old and more hospitals are utilizing it to cover multiple hospitals in their system or for hospitals that lack on-site critical care coverage such as in the rural setting. Doing a needs analysis, picking the appropriate committee to oversee development of the correct model, choosing quality metrics to measure, and designing an implementation plan that has a timeline is how the process should begin. Research including visitation to established programs and connecting with professional societies are helpful. Developing both a business and financial plan will optimize the value of a tele-ICU program. The innovative ICU nursing director will help to integrate a telemedicine program seamlessly with the on-site program to insure a successful program that benefits patients, their families, the ICU staff, and the hospital.

  19. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.« less

  20. SWiFT Software Quality Assurance Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, Jonathan Charles

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  1. Cornell University remote sensing program. [application to waste disposal site selection, study of drainage patterns, and water quality management.

    NASA Technical Reports Server (NTRS)

    Liang, T.; Mcnair, A. J.; Philipson, W. R.

    1977-01-01

    Aircraft and satellite remote sensing technology were applied in the following areas: (1) evaluation of proposed fly ash disposal sites; (2) development of priorities for drainage improvements; (3) state park analysis for rehabilitation and development; (4) watershed study for water quality planning; and (5) assistance project-landfill site selection. Results are briefly summarized. Other projects conducted include: (1) assessment of vineyard-related problems; (2) LANDSAT analysis for pheasant range management; (3) photo-historic evaluation of Revolutionary War sites; and (4) thermal analysis of building insulation. The objectives, expected benefits and actions, and status of these projects are described.

  2. SU-E-T-106: An Institutional Review of Using Commercially Available Software to Evaluate Treatment Plan Quality for Various Treatment Sites and Beam Deliveries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esquivel, C; Patton, L; Walker, S

    Purpose: Use Sun Nuclear Quality Reports™ with PlanIQ™ to evaluate different treatment delivery techniques for various treatment sites. Methods: Fifteen random patients with different treatment sites were evaluated. These include the Head/Neck, prostate, pelvis, lung, esophagus, axilla, bladder and abdomen. Initially, these sites were planned on the Pinnacle {sup 3} V9.6 treatment planning system and utilized nine 6MV step-n-shoot IMRT fields. The RT plan, dose and structure sets were sent to Quality Reports™ where a DVH was recreated and the plans were compared to a unique Plan Algorithm for each treatment site. Each algorithm has its own plan quality metricsmore » and objectives, which include the PTV coverage, PTV maximum dose, the prescription dose outside the target, doses to the critical structures, and the global maximum dose and its location. Each plan was scored base on meeting each objective. Plans may have been reoptimized and reevaluated with Quality Reports™ based on the initial score. PlanIQ™ was used to evaluate if any objective not met was achievable or difficult to obtain. A second plan using VMAT delivery was created for each patient and scored with Quality Reports™. Results: There were a wide range of scores for the different treatment sites with some scoring better for IMRT plans and some better for the VMAT deliveries. The variation in the scores could be attributed to the treatment site, location, and shape of the target. Most deliveries were chosen for the VMAT due to the short treatment times and quick patient throughput with acceptable plan scores. Conclusion: The tools are provided for both physician and dosimetrist to objectively evaluate the use of VMAT delivery versus the step-n-shoot IMRT delivery for various sites. PlanIQ validates if objectives can be met. For the physicist, a concise pass/fail report is created for plan evaluation.« less

  3. Brownfields Samoa Peninsula Project: Phase I Sustainable Site Analysis Final Report

    EPA Pesticide Factsheets

    This report provides an analysis and scoring using the Leadership in Energy and Environmental Design, Neighborhood Development Rating System, and the Land and Natural Development Code in order to assess the proposed redevelopment a master plan.

  4. Shuttle abort landing site emergency medical services

    NASA Technical Reports Server (NTRS)

    Mckenas, David K.; Jennings, Richard T.

    1991-01-01

    NASA and DOD studies of medical-planning and logistical problems are reviewed as applicable to providing emergency medical care at remote transoceanic abort landing (TAL) sites. Two options are analyzed including a modified surgical response team and a combination physician/medical technician team. The two concepts are examined in terms of cost-effectiveness, specific types of medical support such as blood procurement, and search-and-rescue requirements. It is found that the physician/technician team is more economically efficient, and the description of the concept permits the development of an effective TAL-site astronaut medical-support system. A balance is struck between the competing problems of cost and medical capability by planning for on-scene medical stabilization and air evacuation to DOD tertiary medical centers.

  5. CEO Sites Mission Management System (SMMS)

    NASA Technical Reports Server (NTRS)

    Trenchard, Mike

    2014-01-01

    Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

  6. 78 FR 31941 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-28

    ... burden 810 RISE Staff Pre-Test 157 1 .25 39 RISE Staff Post-Test 157 1 .25 39 RISE burden 78 Estimated... addition, evaluation plans were developed to support rigorous site-specific and cross-site studies to... and Lesbian Center's Recognize Intervene Support Empower (RISE) project. A third phase of the study...

  7. Demonstration Report for Visual Sample Plan (VSP) Verification Sampling Methods at the Navy/DRI Site

    DTIC Science & Technology

    2011-08-01

    population of 537,197 with an overall population density of 608 people per square mile (people/ mi2 ). However, the population density in the vicinity...Preliminary Assessment Findings  approximately 12 people/ mi2 . Population density is expected to greatly increase following development of the site

  8. Exploring quality standards for New River Gorge climbing sites: establishing a baseline for the future

    Treesearch

    Roy Ramthun; Andy Blake

    2003-01-01

    The New River Gorge National River has become a major destination for sport climbers in the eastern U.S. A new climbing management plan is being developed for the site. This study examined the satisfaction levels of climbers with some of the easily managed facilities at climbing sites and looked at attributes of the social setting preferred by climbers. Climbers at the...

  9. Integration of Rooftop Photovoltaic Systems in St. Paul Ford Site's Redevelopment Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olis, D.; Mosey, G.

    The purpose of this analysis is to estimate how much electricity the redeveloped Ford Motor Company assembly plant site in St. Paul, Minnesota, might consume under different development scenarios and how much rooftop photovoltaic (PV) generation might be possible at the site. Because the current development scenarios are high-level, preliminary sketches that describe mixes of residential, retail, commercial, and industrial spaces, electricity consumption and available rooftop area for PV under each scenario can only be grossly estimated. These results are only indicative and should be used for estimating purposes only and to help inform development goals and requirements moving forward.

  10. 1. Statement of significance, site plan, plan, elevation, section, boxcar ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Statement of significance, site plan, plan, elevation, section, boxcar spring details, and outhouse plan and elevation. - Woods Landing Dance Hall, 2731 State Highway 230, Woods Landing, Albany County, WY

  11. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    NASA Astrophysics Data System (ADS)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.

  12. "EC to go" takes off at Maryland sites.

    PubMed

    2000-03-01

    Baltimore-based Planned Parenthood of Maryland and the Baltimore City Health Department have joined forces in "EC to Go," which distributes free emergency contraceptive pills (ECPs) through the seven affiliate sites of Planned Parenthood and the three family planning centers of the city. The distribution program was started in October 1999 and funds were provided by an undisclosed area foundation. Although the program is still in its infancy, it has recorded some 800 prescriptions of ECPs in the last fiscal year, and 600 prescriptions have been logged in just the first 6 months of the current fiscal year. To inform the public about the program, Planned Parenthood developed newspaper advertisements, a 60-second radio spot, and coupon distributions, all of which emphasize the fact that emergency contraception is a higher dose of birth control, which can prevent pregnancy if taken within 72 hours of unprotected sex.

  13. Guidelines and incentives for conservation development in local land-use regulations.

    PubMed

    Reed, Sarah E; Hilty, Jodi A; Theobald, David M

    2014-02-01

    Effective conservation of biological diversity on private lands will require changes in land-use policy and development practice. Conservation development (CD) is an alternative form of residential development in which homes are built on smaller lots and clustered together and the remainder of the property is permanently protected for conservation purposes. We assessed the degree to which CD is permitted and encouraged by local land-use regulations in 414 counties in the western United States. Thirty-two percent of local planning jurisdictions have adopted CD ordinances, mostly within the past 10 years. CD ordinances were adopted in counties with human population densities that were 3.0 times greater and in counties with 2.5 times more land use at urban, suburban, and exurban densities than counties without CD ordinances. Despite strong economic incentives for CD (e.g., density bonuses, which allow for a mean of 66% more homes to be built per subdivision area), several issues may limit the effectiveness of CD for biological diversity conservation. Although most CD ordinances required a greater proportion of the site area be protected than in a typical residential development, just 13% (n = 17) of the ordinances required an ecological site analysis to identify and map features that should be protected. Few CD ordinances provided guidelines regarding the design and configuration of the protected lands, including specifying a minimum size for protected land parcels or encouraging contiguity with other protected lands within or near to the site. Eight percent (n =11) of CD ordinances encouraged consultation with a biological expert or compliance with a conservation plan. We recommend that conservation scientists help to improve the effectiveness of CD by educating planning staff and government officials regarding biological diversity conservation, volunteering for their local planning boards, or consulting on development reviews. © 2013 Society for Conservation Biology.

  14. The Road to Tomorrow's Teachers: Planning, Implementing, and Evaluating a State-Based Special Education Workforce Development Initiative. Lessons Learned from the National Pilot Sites Project for Recruitment and Retention. Developing the Special Education Workforce.

    ERIC Educational Resources Information Center

    National Clearinghouse for Professions in Special Education, Arlington, VA.

    This document describes the National Pilot Sites Project for Recruitment and Retention, an effort to recruit, prepare, and retain highly qualified diverse educators and related services personnel for children and youth with disabilities by involving multiple stakeholder groups within selected states (Alabama, Colorado, Georgia, New Jersey, Oregon,…

  15. Cape Blanco Wind Farm Feasibility Study : Technical Report, No. 2, Civil Engineering.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1986-09-01

    An investigation of the feasibility of developing a wind farm near Cape Blanco, Oregon, requires a plan for civil engineering and preliminary site construction activities. In this report, plans for such activities and related cost estimates are presented for a wind farm using either a Boeing MOD-2 or FloWind 170 wind turbine generator.

  16. Race-Neutral Campuses in Urban Areas: A Follow-Up Report on Merger and Joint Planning.

    ERIC Educational Resources Information Center

    Godard, James M.

    Developments during the 1980-81 academic year concerning mergers/joint planning projects designed to eliminate unnecessary duplication of programs between historically black and white colleges in Nashville, Tennessee; Savannah, Georgia; and Norfolk, Virginia are examined. Site visits were made during the second year of operation of the programs at…

  17. In situ gas treatment technology demonstration test plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thornton, E.C.; Miller, R.D.

    1996-02-16

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.

  18. Developing Mathematical Content Knowledge for Teaching: One Preservice Teacher and Her Planning

    ERIC Educational Resources Information Center

    Wilson, Susanna

    2016-01-01

    This paper describes how a new pre-service teacher engaged with mathematical content in order to learn it for teaching, during practicum. The results show that the PST learned mathematical content by initiating and carrying out a preparation phase prior to planning. This phase involved searching through internet sites and making notes that were…

  19. Interpreting ground conditions from geologic maps

    USGS Publications Warehouse

    ,

    1949-01-01

    Intelligent planning for heavy construction, water supply, or other land utilization requires advance knowledge of ground conditions in the area. It is essential to know:the topography, that is, the configuration of the land surface;the geology and soils, that is, the deposits that compose the land and its weathered surface; andthe hydrology, that is, the occurrence of water whether under or on the ground.These elements usually are considered in planning land developments that involve much investment; detailed surveys generally are made of the topography, geology, soils, and hydrology at the site selected for development. Such detailed surveys are essential, but equally essential and often overlooked is the need for general surveys prior to site selection.Only if the general surveys have been made is it possible to know that a particular site is most suitable for the purpose and that no situations in the tributary areas that might affect the project have been overlooked. Moreover, the general regional relations must be known in order to properly interpret the geology, soils, and hydrology at a particular locality. In brief, both the general and the specific are needed in order to avoid costly mistakes either during or after development.The accompanying maps illustrate how a general geologic map can be used for interpreting grc .d conditions during a planning stage prior to site selection. The topographic and geologic maps, which provide the basic data, have been simplified from some existing ones. The interpretive sheets are intended to provide some examples of the kinds of information that trained persons can read from such basic maps.

  20. National Stormwater Calculator: Low Impact Development Stormwater Control Cost Estimation Programming & Future Enhancements - Presentation

    EPA Science Inventory

    The National Stormwater Calculator (NSC) makes it easy to estimate runoff reduction when planning a new development or redevelopment site with low impact development (LID) stormwater controls. The Calculator is currently deployed as a Windows desktop application. The NSC is organ...

  1. National Stormwater Calculator: Low Impact Development Stormwater Control Cost Estimation Programming & Future Enhancements - abstract

    EPA Science Inventory

    The National Stormwater Calculator (NSC) makes it easy to estimate runoff reduction when planning a new development or redevelopment site with low impact development (LID) stormwater controls. The Calculator is currently deployed as a Windows desktop application. The Calculator i...

  2. A Suite of GIS-Based Tools for Siting Low Impact Development in an Urban Watershed

    EPA Science Inventory

    Low impact development (LID) -- a comprehensive land use planning and design approach with the goal of mitigating development impacts on hydrologic/nutrient cycles and ecosystems -- is increasingly being touted as an effective approach to lessen overland runoff and pollutant load...

  3. Identifying priority sites for low impact development (LID) in a mixed-use watershed

    EPA Science Inventory

    ABSTRACT: Low impact development (LID), a comprehensive land use planning and design approach with the goal of mitigating land development impacts to the environment, is increasingly being touted as an effective approach to lessen runoff and pollutant loadings to streams. Broad-s...

  4. PLUS: 'Planning Land Use with Students' is a Local Land Use Policy That Showcase the Geosciences

    NASA Astrophysics Data System (ADS)

    Turrin, M.

    2014-12-01

    Land Use decisions in the local community are well represented in geoscience topics and issues, and provide an excellent opportunity to showcase a wide range of geoscience careers to high school students. In PLUS (Planning Land Use with Students) we work with youth corps, volunteer agencies and the County Departments of Planning, Transportation, Public Health, Water Resources to run a program for high school seniors to engage the students in the complex layers of decision making connected with land use as we showcase geoscience careers (http://www.ldeo.columbia.edu/edu/plus/index.html). How development occurs, what resources are in use and who makes these decisions is both interesting and relevant for students. We develop case studies around current, active, local land use issues large enough in scale to have a formal environmental review at the County and/or the State level. Sections of each case study are dedicated to addressing the range of environmental issues that are central to each land use decision. Water, its availability, planned use and treatment on the site, brings in both a review of local hydrology and a discussion of storm water management. Air quality and the impact of the proposed project's density, transportation plans, and commercial and industrial uses brings in air quality issues like air quality ratings, existing pollution, and local air monitoring. A review of the site plans brings in grading plans for the project area, which highlights issues of drainage, soil stability, and exposure to toxins or pollutants depending on the historic use of the site. Brownfield redevelopments are especially challenging with various monitoring, clean up and usage restrictions that are extremely interesting to the students. Students' work with mentors from the community who represent various roles in the planning process including a range of geosciences, community business members and other players in the planning process. This interplay of individuals provides a realistic look at the forces that move land use decision-making in a community. Discussion of impacts and mitigations highlight the intersection of policy and science. Debate arises on how much science should guide policy and how much land use policy decisions require science monitoring, pushing new scientific developments.

  5. Project Village conceptual plans. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming; proposed housing facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The WyCoal Project Village is a housing facility proposed adjacent to the Wyoming Coal Gasification Project plant construction site that would accommodate single workers in dormitory units and singles or couples at a recreation vehicle park. Centralized services and recreational facilities are also to be provided. The provision for some mobile home units to be used in lieu of RV spaces has been considered but would be developed only if a strong demonstrated demand from singles and couples required such a provision. No children will be allowed at the Project Village as accommodations for families will be available in themore » town of Douglas. The development program for the Project Village calls for a total plan capacity of 225 living units: 1500 dormitory rooms and 750 recreational vehicle spaces. However, the total units to be developed will not exceed 1800 with peak employment, including couples at the Recreational Vehicle Park, not anticipated to exceed 2000. The flexibility within the maximum plan capacity of 2250 will allow for the development of an appropriate balance of housing units geared to the on-site project demands as plant construction occurs. At this time a mix of approximately 1200 dormitory rooms and 600 RV spaces appears appropriate for planning purposes.« less

  6. Methodology for Augmenting Existing Paths with Additional Parallel Transects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, John E.

    2013-09-30

    Visual Sample Plan (VSP) is sample planning software that is used, among other purposes, to plan transect sampling paths to detect areas that were potentially used for munition training. This module was developed for application on a large site where existing roads and trails were to be used as primary sampling paths. Gap areas between these primary paths needed to found and covered with parallel transect paths. These gap areas represent areas on the site that are more than a specified distance from a primary path. These added parallel paths needed to optionally be connected together into a single path—themore » shortest path possible. The paths also needed to optionally be attached to existing primary paths, again with the shortest possible path. Finally, the process must be repeatable and predictable so that the same inputs (primary paths, specified distance, and path options) will result in the same set of new paths every time. This methodology was developed to meet those specifications.« less

  7. STORMWATER MANAGEMENT AND LOW IMPACT DEVELOPMENT PRESENTATION DESCRIPTION

    EPA Science Inventory

    Low Impact Development (LID) is the general term typically used to characterize a comprehensive array of site planning, design and pollution prevention strategies that when combined create a more economically sustainable and ecologically functional urban landscape. LID uses a dec...

  8. Documenting Living Monuments in Indonesia: Methodology for Sustainable Utility

    NASA Astrophysics Data System (ADS)

    Suryaningsih, F.; Purwestri, N.

    2013-07-01

    The systematic documentation of cultural heritage in Indonesia has been developed after the establishment of Bataviaasch Genootschap van Kunsten en Wetenschappen (1778) and De Oudheidkundige Dienst (1913) by the Netherlands Indies government. After Indonesian independent, the tasks of cultural heritage documentation take over by The Ministry of Culture (now become The Ministry of Education of Culture) with focus on the ancient and classical heritage, so called dead monument. The needed of comprehensive documentation data regarding cultural heritage become significant issues since the government and private sector pay attention to the preservation of heritage building in the urban site, so called living monument. The archives of original drawing plan many times do not fit with the existing condition, while the conservation plan demands a document such as built drawing plan to work on. The technology, methodology and system to provide such comprehensive document of heritage building and site become important, to produce good conservation plan and heritage building regular maintenance. It means the products will have a sustainable and various utility values. Since 1994, Documentation Centre for Architecture - Indonesia (PDA), has established to meet the needs of a comprehensive data of heritage building (living monuments), to utilized as basic document for conservation planning. Not only provide document of the digital drawing such site plan, plan, elevation, section and details of architecture elements, but also document of historic research, material analysis and completed with diagnosis and mapping of building damages. This manuscript is about PDA field experience, working in this subject issue

  9. Thermal area effectiveness for future aircraft

    NASA Technical Reports Server (NTRS)

    Happ, W. W.

    1975-01-01

    Problem areas in airport planning, design, and operations identified by a decision matrix developed to display various airport functions interfaced with facilities and an extensive literature survey were investigated. Areas considered include: site selection and growth potential; emissions and noise control/containment for airports; financial and legal aspects of airport planning, contruction, and operation; intra-airport transportation and other passenger flow facilitators; simulation and modeling for airports; guidelines for airport multimodal access planning. Results are summarized and a bibliography is included.

  10. Radio-ecological characterization and radiological assessment in support of regulatory supervision of legacy sites in northwest Russia.

    PubMed

    Sneve, M K; Kiselev, M; Shandala, N K

    2014-05-01

    The Norwegian Radiation Protection Authority has been implementing a regulatory cooperation program in the Russian Federation for over 10 years, as part of the Norwegian government's Plan of Action for enhancing nuclear and radiation safety in northwest Russia. The overall long-term objective has been the enhancement of safety culture and includes a special focus on regulatory supervision of nuclear legacy sites. The initial project outputs included appropriate regulatory threat assessments, to determine the hazardous situations and activities which are most in need of enhanced regulatory supervision. In turn, this has led to the development of new and updated norms and standards, and related regulatory procedures, necessary to address the often abnormal conditions at legacy sites. This paper presents the experience gained within the above program with regard to radio-ecological characterization of Sites of Temporary Storage for spent nuclear fuel and radioactive waste at Andreeva Bay and Gremikha in the Kola Peninsula in northwest Russia. Such characterization is necessary to support assessments of the current radiological situation and to support prospective assessments of its evolution. Both types of assessments contribute to regulatory supervision of the sites. Accordingly, they include assessments to support development of regulatory standards and guidance concerning: control of radiation exposures to workers during remediation operations; emergency preparedness and response; planned radionuclide releases to the environment; development of site restoration plans, and waste treatment and disposal. Examples of characterization work are presented which relate to terrestrial and marine environments at Andreeva Bay. The use of this data in assessments is illustrated by means of the visualization and assessment tool (DATAMAP) developed as part of the regulatory cooperation program, specifically to help control radiation exposure in operations and to support regulatory analysis of management options. For assessments of the current radiological situation, the types of data needed include information about the distribution of radionuclides in environmental media. For prognostic assessments, additional data are needed about the landscape features, on-shore and off-shore hydrology, geochemical properties of soils and sediments, and possible continuing source terms from continuing operations and on-site disposal. It is anticipated that shared international experience in legacy site characterization can be useful in the next steps. Although the output has been designed to support regulatory evaluation of these particular sites in northwest Russia, the methods and techniques are considered useful examples for application elsewhere, as well as providing relevant input to the International Atomic Energy Agency's international Working Forum for the Regulatory Supervision of Legacy Sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Use of Artificial Burrows by Burrowing Owls (Athene cunicularia) at the HAMMER Facility on the U.S. Department of Energy Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alexander, Amanda K.; Sackschewsky, Michael R.; Duberstein, Corey A.

    In 2003 the U.S. Department of Energy (DOE) constructed an Emergency Vehicle Operations Course (EVOC) at the Hazardous Material Management and Emergency Response Training and Education Center (HAMMER) in the southern portion of the Hanford Site. Preliminary surveys during 2001 identified an active burrowing owl (Athene cunicularia) burrow and three burrowing owls within the proposed development area. Burrowing owls were classified as a federal species of concern, a Washington State ?candidate? species, a Washington Department of Fish and Wildlife priority species, and a Hanford Site Biological Resources Management Plan Level III resource. Therefore, the mitigation action plan for the projectmore » included the installation of twenty artificial burrows around EVOC in the spring of 2003. The mitigation plan established a success criterion of five percent annual use of the burrows by owls. In July 2005, a field survey of the EVOC burrow complex was conducted to determine use and demography at each site. Burrow locations were mapped and signs of activity (feces, owl tracks, castings, feathers) were recorded. Out of the twenty burrows, twelve were found to be active. Of the eight inactive burrows three appeared to have been active earlier in the 2005 breeding season. A total of nineteen owls were counted but demography could not be determined. It appears that the EVOC mitigation exceeded burrow use goals during 2005. Continued site monitoring and maintenance, according to mitigation plan guidelines should be conducted as prescribed.« less

  12. Library Web Site Administration: A Strategic Planning Model For the Smaller Academic Library

    ERIC Educational Resources Information Center

    Ryan, Susan M.

    2003-01-01

    Strategic planning provides a useful structure for creating and implementing library web sites. The planned integration of a library's web site into its mission and objectives ensures that the library's community of users will consider the web site one of the most important information tools the library offers.

  13. A Markov model for planning and permitting offshore wind energy: A case study of radio-tracked terns in the Gulf of Maine, USA.

    PubMed

    Cranmer, Alexana; Smetzer, Jennifer R; Welch, Linda; Baker, Erin

    2017-05-15

    Quantifying and managing the potential adverse wildlife impacts of offshore wind energy is critical for developing offshore wind energy in a sustainable and timely manner, but poses a significant challenge, particularly for small marine birds that are difficult to monitor. We developed a discrete-time Markov model of seabird movement around a colony site parameterized by automated radio telemetry data from common terns (Sterna hirundo) and Arctic terns (S. paradisaea), and derived impact functions that estimate the probability of collision fatality as a function of the distance and bearing of wind turbines from a colony. Our purpose was to develop and demonstrate a new, flexible tool that can be used for specific management and wind-energy planning applications when adequate data are available, rather than inform wind-energy development at this site. We demonstrate how the tool can be used 1) in marine spatial planning exercises to quantitatively identify setback distances under development scenarios given a risk threshold, 2) to examine the ecological and technical trade-offs of development alternatives to facilitate negotiation between objectives, and 3) in the U.S. National Environmental Policy Act (NEPA) process to estimate collision fatality under alternative scenarios. We discuss model limitations and data needs, and highlight opportunities for future model extension and development. We present a highly flexible tool for wind energy planning that can be easily extended to other central place foragers and data sources, and can be updated and improved as new monitoring data arises. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Ecological Restoration of Coastal Sage Scrub and Its Potential Role in Habitat Conservation Plans.

    PubMed

    BOWLER

    2000-07-01

    Extensive acreage loss of coastal sage scrub (CSS), isolation of surviving stands, and the federal listing of several animal species with obligate relationships to this plant community, particularly the threatened California gnatcatcher (Polioptila californica), have led to attempts to create CSS to mitigate habitat lost to urban development and other causes. Many of these creations lie within habitat conservation plan (HCP) sites, and they could play a more prominent role by being repositories for plants taken from a single site having site-specific genetics. Among others, one technique that increases initial resemblance to natural stands uses digitized, to-scale photography, which has been ground-truthed to verify vascular plant associations, which appear as mosaics on a landscape. A combination of placing patches of salvaged, mature canopy plants within larger matrices of imprinted or container plant plots appears to significantly enhance immediate use by CSS obligate bird species, accelerate "spread" or expansion of CSS, and can also introduce many epiphytic taxa that otherwise would be slow or unable to occupy developing CSS creations. Reptile, amphibian, butterfly, and rodent diversity in a salvaged canopy restoration case study at the University of California, Irvine, showed CSS species foraging and inhabiting transplanted canopy patches. Using restoration techniques to expand existing CSS stands has more promise than creating isolated patches, and the creation of canopies resembling CSS mid-fire cycle stands is now common. Gnatcatchers and other birds use restorations for foraging and occasional nesting, and in some cases created stands along "biological corridors" appear to be useful to bird movement. Patches of transplanted sage scrub shrubs along habitat edges appear to break up linear edge effects. There are no data on which long-term survival, succession, or postfire behavior can be predicted for CSS restoration sites, and postfire community changes are not part of either mitigation or restoration planning at present. Long-term planning including burning is needed so that a fire-adapted habitat will develop. Restoration is important in retaining genetic resources, for ameliorating edge effects, as habitat extenders in buffer zones around HCP sites, and by providing areas into which natural stands can expand.

  15. Evaluation of site plan review procedures.

    DOT National Transportation Integrated Search

    1988-01-01

    The site plan review procedures of the Virginia Department of Transportation (VDOT) were evaluated. The objectives of the evaluation were to recommend (1) a set of site plan review procedures including a checklist, (2) definitions of the roles and re...

  16. Base Realignment and Closure (BRAC) Cleanup Plan for Fort Devens, Fort Devens, Massachusetts

    DTIC Science & Technology

    1994-04-07

    Landfill (AOCs 4, 5, 18, and 40) were identified in the MEP as the highest priority (Priority 1A) for remediation. As such, these sites proceeded...Spring Brook Landfills OUs, etc. 4.1.4 Environmental Restoration Early Actions Strategy The Site Investigation (SI) Data Package concept was developed...Approach for the Shepley’ s Hill and Cold Spring Brook Landfill Sites . Fort Devens. Massachusetts, prepared for USAEC; February. Ecology & Environment

  17. Heartland Engineers: A Century of Superior Service 1907-2007

    DTIC Science & Technology

    2009-01-01

    NJ SUPERFUND SITE, REMEDIAL DESIGN 104. INDEPENDENCE AAF: OEW LMS ASR-NOFA 105. INDEPENDENCE SATELLITE POW CAMP: PA/INPR 106. INVES. & ASSESS IMA-AR...the development of nuclear weaponry, under the Formerly Used Sites Remedial Action Plan (FUSRAP) for the Department of Energy as well as Formerly Used...further assist in the cleanup of Cold War legacy wastes through the U.S. Depart- ment of Energy’s Formerly Utilized Sites Remedial Action Program

  18. Craney Island Disposal Area: Updated Projections for Filling Rates through 1989

    DTIC Science & Technology

    1992-08-01

    2,500-acre confined dredged material disposal facility located near Norfolk, VA. In 1981, the Cwaney Island Management Plan ( CIMP ) was developed to extend...the useful life of the site for disposal of maintenance material from the project area. The CIMP called for subdivision of the site into three...subcontainments and use of alternating filling and dewatering cycles. Management of the site in general accordance with the CIMP was implemented in 1984

  19. 7 CFR 1924.109-1924.114 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.109-1924...

  20. 7 CFR 1924.116-1924.118 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.116-1924...

  1. 7 CFR 1924.123-1924.149 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.123-1924...

  2. 7 CFR 1924.120-1924.121 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE PROGRAM REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work §§ 1924.120-1924...

  3. 77 FR 47617 - Notice of Submission for OMB Review; Office of Planning, Evaluation and Policy Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... information technology. Please note that written comments received in response to this notice will be... conducting qualitative case studies of up to 15 sites with a focus on preventing students from dropping out... qualitative data across multiple respondents to generate portraits of programs and strategies that the sites...

  4. Photographic copy of site plan for proposed Test Stand "D" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of site plan for proposed Test Stand "D" in 1958. The contemporary site plans of test stands "A," "B," and "C" are also visible, along with the interconnecting tunnel system. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering "Site Plan for Proposed Test Stand "D" - Edwards Test Station," drawing no. ESP/22-0, 14 November 1958 - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  5. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. Consumer-directed health plans: mixed employer signals, complex market dynamics.

    PubMed

    Tynan, Ann; Christianson, Jon B

    2008-03-01

    Health plans have expanded consumer-directed health plan (CDHP) product offerings--typically high-deductible health plans coupled with a spending account--and more employers are offering these products to workers, according to findings from the Center for Studying Health System Change's (HSC) 2007 site visits to 12 nationally representative metropolitan communities. In developing CDHPs, health plans are responding to a broader employer strategy to confer more responsibility on workers for their health care costs, lifestyle choices and treatment decisions. CDHP adoption by employers and consumers depends on a range of factors, including product features and employer characteristics, and varies across the 12 communities. While more large employers are introducing CDHPs into health benefit programs, adoption of CDHPs remains modest. Health plans and employers expect CDHP enrollment to grow as employers and employees become more knowledgeable about CDHP features, health plans develop more sophisticated support tools for plan enrollees, and there are more opportunities to learn from early adopters' experiences.early

  7. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  8. Developing an Intergenerational Program.

    ERIC Educational Resources Information Center

    Brummel, Steven W.

    1989-01-01

    Steps in the development of intergenerational programs include the following: (1) needs assessment; (2) planning; (3) implementation; (4) assuring program longevity; and (5) establishing a national focus. Detailed description of such stages as facility and site procurement, recruitment, orientation, training, maintenance, and support is provided.…

  9. Development of a short course in transportation planning for electronic delivery to DOTD.

    DOT National Transportation Integrated Search

    2000-12-01

    This report describes the preparation, delivery, and evaluation of a short course developed for delivery through compressed video to remote sites. The course covered basics of travel demand models and involved approximately 28 hours of classroom cont...

  10. Novel approaches for an enhanced geothermal development of residential sites

    NASA Astrophysics Data System (ADS)

    Schelenz, Sophie; Firmbach, Linda; Shao, Haibing; Dietrich, Peter; Vienken, Thomas

    2015-04-01

    An ongoing technological enhancement drives an increasing use of shallow geothermal systems for heating and cooling applications. However, even in areas with intensive shallow geothermal use, planning of geothermal systems is in many cases solely based on geological maps, drilling databases, and literature references. Thus, relevant heat transport parameters are rather approximated than measured for the specific site. To increase the planning safety and promote the use of renewable energies in the domestic sector, this study investigates a novel concept for an enhanced geothermal development of residential neighbourhoods. This concept is based on a site-specific characterization of subsurface conditions and the implementation of demand-oriented geothermal usage options. Therefore, an investigation approach has been tested that combines non-invasive with minimum-invasive exploration methods. While electrical resistivity tomography has been applied to characterize the geological subsurface structure, Direct Push soundings enable a detailed, vertical high-resolution characterization of the subsurface surrounding the borehole heat exchangers. The benefit of this site-specific subsurface investigation is highlighted for 1) a more precise design of shallow geothermal systems and 2) a reliable prediction of induced long-term changes in groundwater temperatures. To guarantee the financial feasibility and practicability of the novel geothermal development, three different options for its implementation in residential neighbourhoods were consequently deduced.

  11. SU-E-T-420: Failure Effects Mode Analysis for Trigeminal Neuralgia Frameless Radiosurgery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howe, J

    2015-06-15

    Purpose: Functional radiosurgery has been used successfully in the treatment of trigeminal neuralgia but presents significant challenges to ensuring the high prescription dose is delivered accurately. A review of existing practice should help direct the focus of quality improvement for this treatment regime. Method: Failure modes and effects analysis was used to identify the processes in preparing radiosurgery treatment for TN. The map was developed by a multidisciplinary team including: neurosurgeon, radiation oncology, physicist and therapist. Potential failure modes were identified for each step in the process map as well as potential causes and end effect. A risk priority numbermore » was assigned to each cause. Results: The process map identified 66 individual steps (see attached supporting document). Corrective actions were developed for areas of high risk priority number. Wrong site treatment is at higher risk for trigeminal neuralgia treatment due to the lack of site specific pathologic imaging on MR and CT – additional site specific checks were implemented to minimize the risk of wrong site treatment. Failed collision checks resulted from an insufficient collision model in the treatment planning system and a plan template was developed to address this problem. Conclusion: Failure modes and effects analysis is an effective tool for developing quality improvement in high risk radiotherapy procedures such as functional radiosurgery.« less

  12. Thermal infrared remote sensing in assessing groundwater and surface-water resources related to Hannukainen mining development site, northern Finland

    NASA Astrophysics Data System (ADS)

    Rautio, Anne B.; Korkka-Niemi, Kirsti I.; Salonen, Veli-Pekka

    2018-02-01

    Mining development sites occasionally host complicated aquifer systems with notable connections to natural surface water (SW) bodies. A low-altitude thermal infrared (TIR) imaging survey was conducted to identify hydraulic connections between aquifers and rivers and to map spatial surface temperature patterns along the subarctic rivers in the proximity of the Hannukainen mining development area, northern Finland. In addition to TIR data, stable isotopic compositions ( δ 18O, δD) and dissolved silica concentrations were used as tracers to verify the observed groundwater (GW) discharge into the river system. Based on the TIR survey, notable GW discharge into the main river channel and its tributaries (61 km altogether) was observed and over 500 GW discharge sites were located. On the basis of the survey, the longitudinal temperature patterns of the studied rivers were found to be highly variable. Hydrological and hydrogeological information is crucial in planning and siting essential mining operations, such as tailing areas, in order to prevent any undesirable environmental impacts. The observed notable GW discharge was taken into consideration in the planning of the Hannukainen mining development area. The results of this study support the use of TIR imagery in GW-SW interaction and environmental studies in extensive and remote areas with special concerns for water-related issues but lacking the baseline research.

  13. Building capacity in nursing: creating a leadership institute.

    PubMed

    Simpson, Beverley; Skelton-Green, Judith; Scott, Julia J; O'Brien-Pallas, Linda

    2002-01-01

    The authors describe the development of the Dorothy M. Wylie Nursing Leadership Institute, an innovative partnership of the Nursing Effectiveness, Outcomes and Utilization Research Unit at the University of Toronto site and nurse consultants with expertise in organizational and human resource development. The context for the initiative, needs and rationale, supporting literature and the coalition-building and planning activities are outlined. The program and its conceptual underpinnings, creation of a learning community, participant profiles, evaluation processes and future plans are described.

  14. Integrating bird-habitat modeling into national forest planning for bird conservation in the southern Appalachians

    Treesearch

    David A. Buehler; Eric T. Linder; Kathleen E. Franzreb; Nathan A. Klaus; Randy Dettmers; John G. Bartlett

    2005-01-01

    We developed spatially-explicit bird-habitat models with a variety of site-specific and landscape parameters to predict avian species distributions on southern Appalachian National Forests to aid National Forests with bird conservation planning. These models can be used to assess the effects of different forest management alternatives on long-term population viability...

  15. Groundwater Risk Management Handbook

    DTIC Science & Technology

    2008-01-01

    restoration of groundwater to drinking water quality may not always be achievable due to technology limitations and, therefore, has developed a...extent (horizontal and vertical) of groundwater contamination • Future plans for groundwater use in the area, including local water resource planning...exposure (e.g., drinking water supplied by public water system and groundwater beneath the site is restricted for potable purposes) • Land use

  16. Application of Earth Resources Technology Satellite data to urban development and regional planning: Test site, County of Los Angeles

    NASA Technical Reports Server (NTRS)

    Raje, S. (Principal Investigator); Economy, R.; Mcknight, J. S.; Garofalo, P.

    1973-01-01

    The author has identified the following significant results. Signigicant results have been obtained from the analyses of ERTS-1 imagery from five cycles over Test Site SR 124 by classical photointerpretation and by an interactive hybrid multispectral information extraction system (GEMS). Photointerpretation has produced over 25 overlays at 1:1,000,000 scale depicting regional relations and urban structure in terms of several hundred linear and areal features. A possible new fault lineament has been discovered on the northern slope of the Santa Monica mountains. GEMS analysis of the ERTS-1 products has provided new or improved information in the following planning data categories: urban vegetation; land cover segregation; manmade and natural impact monitoring; urban design; land suitability. ERTS-1 data analysis has allowed planners to establish trends that directly impact planning policies. For example, detectable grading and new construction sites quantitatively indicated the extent, direction, and rate of urban expansion which enable planners to forecast demand and growth patterns on a regional scale. This new source of information will not only assist current methods to be more efficient, but permits entirely new planning methodologies to be employed.

  17. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  18. Geothermal resources in Oregon: site data base and development status

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Justus, D.L.

    An inventory of resources based on available information is presented. Potential for utilization and the legal and institutional environment in which development is likely to occur were also considered. Sites selected for this investigation include the 13 identified KGRA's, one PGRA which was chosen because of substantial local interest expressed in favor of development, and one major geologic fault zone which shows indications of high potential. Each chapter represents a planning region and is introduced by a regional overview of the physical setting followed by a narrative summary statement of the specific resource location and characteristics, existing utilization and potentialmore » end-uses for future development. Detailed site information in the form of data sheets follows each narrative. (MHR)« less

  19. National Register of Historic Places multiple property documentation form -- Historic, archaeological, and traditional cultural properties of the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nickens, P.R.

    The US Department of Energy`s Hanford Site encompasses an area of 560 square miles on the Columbia River in southeastern Washington. Since 1943, the Hanford Site has existed as a protected area for activities primarily related to the production of radioactive materials for national defense uses. For cultural resources on the Hanford Site, establishment of the nuclear reservation as a high security area, with public access restricted, has resulted in a well-protected status, although no deliberate resource protection measures were in effect to mitigate effects of facilities construction and associated activities. Thus, the Hanford Site contains an extensive record ofmore » aboriginal archaeological sites and Native American cultural properties, along with pre-Hanford Euro-American sites (primarily archaeological in nature with the removal of most pre-1943 structures), and a considerable number of Manhattan Project/Cold War era buildings and structures. The recent mission change from production to clean up and disposal of DOE lands created a critical need for development and implementation of new and different cultural resource management strategies. DOE-RL has undertaken a preservation planning effort for the Hanford Site. The intent of this Plan is to enable DOE-RL to organize data and develop goals, objectives, and priorities for the identification, evaluation, registration, protection, preservation, and enhancement of the Site`s historical and cultural properties. Decisions made about the identification, evaluation, registration and treatment of historic properties are most aptly made when relationships between individual properties and other similar properties are considered. The historic context and the multiple property documentation (NTD) process provides DOE-RL the organizational framework for these decisions. Once significant patterns are identified, contexts developed, and expected properties are defined, the NTD process provides the foundation for future decisions concerning the management of significant cultural resources on the Hanford Site.« less

  20. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Victoria Avenue to Citrus Groves) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  1. A Study of the Communication Capabilities of the OPARS Flight Planning System for Various Levels of Demand.

    DTIC Science & Technology

    1980-03-01

    Oceanography Center (FNOC) is currently testing and evaluating a computerized flight plan system, referred to, for short, as OPARS. This sytem , developed to...replace the Lockheed Jetplan flight plan sytem , provides users at remote sites with direct access to the FNOC computer via 11 telephone lines. The...validity, but only for format. For example, an entry of ABCE , as the four- letter identification code for the destination airfield, would be accepted

  2. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    DTIC Science & Technology

    2012-05-22

    Planning 14 and airfields. Don’t want to clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base...clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base camp site location is chosen based on

  3. TU-AB-303-03: CBCT-Based On-Site Simulation, Planning, and Delivery (OSPD) for Whole Brain Radiotherapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le, A; Choe, K; Jiang, S

    2015-06-15

    Purpose: To demonstrate the feasibility of a CBCT-based on-site simulation, planning, and delivery (OSPD) for whole brain radiotherapy, in which all steps from imaging, planning to treatment delivery are performed at the treatment unit in one appointment time slot. This work serves as the proof of concept for future OSPD single fraction radiation therapy. Methods: An integrated on-site imaging, planning and delivery workflow was developed and tested for whole brain radiotherapy. An automated two-opposed-oblique-beam plan is created by utilizing the treatment planning system scripting and simple field-in-field IMRT. The IMRT plan is designed with maximum 8 control points to covermore » the target volume consisting of the brain to C1/C2 of the spinal cord, with dose homogeneity criteria from −5% to +7% of the prescription dose. Due to inaccuracy of reconstructed Hounsfield unit numbers in CBCT images, the dose distribution is calculated with non-heterogeneity correction introducing only clinically insignificant dose discrepancy. A coherent and synchronized workflow was designed for a team of attending physician, physicist, therapists, and dosimetrist to work closely with the ability to quickly modify, approve, and implement the treatment. Results: Thirty-one patients have been treated with this OSPD treatment, without compromising the plan quality compared to our regular clinically used parallel apposed 2D plans. The average time for these procedures are 48.02 ±11.55 minutes from the time patient entered the treatment room until s/he exited, and 35.09 ±10.35 minutes from starting CBCT until last beam delivered. This time duration is comparable to the net time when individual tasks are summed up during our regular CT- based whole brain planning and delivery. Conclusions: The OSPD whole brain treatment has been tested to be clinically feasible. The next step is to further improve the efficiency and to streamline the workflow. Other disease sites will be also tested with this new technology.« less

  4. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Groves & Irrigation System to Grove Canal) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  5. Flue gas desulfurization gypsum and fly ash

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    The Cumberland Fossil Plant (CUF) is located in Stewart County, Tennessee, and began commercial operation in 1972. This is the Tennessee Valley Authority`s newest fossil (coal-burning) steam electric generating plant. Under current operating conditions, the plant burns approximately seven million tons of coal annually. By-products from the combustion of coal are fly ash, approximately 428,000 tons annually, and bottom ash, approximately 115,000 tons annually. Based on historical load and projected ash production rates, a study was initially undertaken to identify feasible alternatives for marketing, utilization and disposal of ash by-products. The preferred alternative to ensure that facilities are planned formore » all by-products which will potentially be generated at CUF is to plan facilities to handle wet FGD gypsum and dry fly ash. A number of different sites were evaluated for their suitability for development as FGD gypsum and ash storage facilities. LAW Engineering was contracted to conduct onsite explorations of sites to develop information on the general mature of subsurface soil, rock and groundwater conditions in the site areas. Surveys were also conducted on each site to assess the presence of endangered and threatened species, wetlands and floodplains, archaeological and cultural resources, prime farmland and other site characteristics which must be considered from an environmental perspective.« less

  6. Interim Draft: Biological Sampling and Analysis Plan Outline ...

    EPA Pesticide Factsheets

    Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haney, Thomas Jay

    This report documents the Data Quality Objectives (DQOs) developed for the Idaho National Laboratory (INL) Site ambient air surveillance program. The development of the DQOs was based on the seven-step process recommended “for systematic planning to generate performance and acceptance criteria for collecting environmental data” (EPA 2006). The process helped to determine the type, quantity, and quality of data needed to meet current regulatory requirements and to follow U.S. Department of Energy guidance for environmental surveillance air monitoring design. It also considered the current air monitoring program that has existed at INL Site since the 1950s. The development of themore » DQOs involved the application of the atmospheric dispersion model CALPUFF to identify likely contamination dispersion patterns at and around the INL Site using site-specific meteorological data. Model simulations were used to quantitatively assess the probable frequency of detection of airborne radionuclides released by INL Site facilities using existing and proposed air monitors.« less

  8. Surgical robot setup simulation with consistent kinematics and haptics for abdominal surgery.

    PubMed

    Hayashibe, Mitsuhiro; Suzuki, Naoki; Hattori, Asaki; Suzuki, Shigeyuki; Konishi, Kozo; Kakeji, Yoshihiro; Hashizume, Makoto

    2005-01-01

    Preoperative simulation and planning of surgical robot setup should accompany advanced robotic surgery if their advantages are to be further pursued. Feedback from the planning system will plays an essential role in computer-aided robotic surgery in addition to preoperative detailed geometric information from patient CT/MRI images. Surgical robot setup simulation systems for appropriate trocar site placement have been developed especially for abdominal surgery. The motion of the surgical robot can be simulated and rehearsed with kinematic constraints at the trocar site, and the inverse-kinematics of the robot. Results from simulation using clinical patient data verify the effectiveness of the proposed system.

  9. Human-Robot Site Survey and Sampling for Space Exploration

    NASA Technical Reports Server (NTRS)

    Fong, Terrence; Bualat, Maria; Edwards, Laurence; Flueckiger, Lorenzo; Kunz, Clayton; Lee, Susan Y.; Park, Eric; To, Vinh; Utz, Hans; Ackner, Nir

    2006-01-01

    NASA is planning to send humans and robots back to the Moon before 2020. In order for extended missions to be productive, high quality maps of lunar terrain and resources are required. Although orbital images can provide much information, many features (local topography, resources, etc) will have to be characterized directly on the surface. To address this need, we are developing a system to perform site survey and sampling. The system includes multiple robots and humans operating in a variety of team configurations, coordinated via peer-to-peer human-robot interaction. In this paper, we present our system design and describe planned field tests.

  10. A multi-scale spatial approach to address environmental effects of small hydropower development.

    PubMed

    McManamay, Ryan A; Samu, Nicole; Kao, Shih-Chieh; Bevelhimer, Mark S; Hetrick, Shelaine C

    2015-01-01

    Hydropower development continues to grow worldwide in developed and developing countries. While the ecological and physical responses to dam construction have been well documented, translating this information into planning for hydropower development is extremely difficult. Very few studies have conducted environmental assessments to guide site-specific or widespread hydropower development. Herein, we propose a spatial approach for estimating environmental effects of hydropower development at multiple scales, as opposed to individual site-by-site assessments (e.g., environmental impact assessment). Because the complex, process-driven effects of future hydropower development may be uncertain or, at best, limited by available information, we invested considerable effort in describing novel approaches to represent environmental concerns using spatial data and in developing the spatial footprint of hydropower infrastructure. We then use two case studies in the US, one at the scale of the conterminous US and another within two adjoining rivers basins, to examine how environmental concerns can be identified and related to areas of varying energy capacity. We use combinations of reserve-design planning and multi-metric ranking to visualize tradeoffs among environmental concerns and potential energy capacity. Spatial frameworks, like the one presented, are not meant to replace more in-depth environmental assessments, but to identify information gaps and measure the sustainability of multi-development scenarios as to inform policy decisions at the basin or national level. Most importantly, the approach should foster discussions among environmental scientists and stakeholders regarding solutions to optimize energy development and environmental sustainability.

  11. Twenty-Five Year Site Plan FY2013 - FY2037

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, William H.

    2012-07-12

    Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also usesmore » the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.« less

  12. Treatment planning and delivery of involved field radiotherapy in advanced Hodgkin's disease: results from a questionnaire-based audit for the UK Stanford V regimen vs ABVD clinical trial quality assurance programme (ISRCTN 64141244).

    PubMed

    Diez, P; Hoskin, P J; Aird, E G A

    2007-10-01

    This questionnaire forms the basis of the quality assurance (QA) programme for the UK randomized Phase III study of the Stanford V regimen versus ABVD for treatment of advanced Hodgkin's disease to assess differences between participating centres in treatment planning and delivery of involved-field radiotherapy for Hodgkin's lymphoma The questionnaire, which was circulated amongst 42 participating centres, consisted of seven sections: target volume definition and dose prescription; critical structures; patient positioning and irradiation techniques; planning; dose calculation; verification; and future developments The results are based on 25 responses. One-third plan using CT alone, one-third use solely the simulator and the rest individualize, depending on disease site. Eleven centres determine a dose distribution for each patient. Technique depends on disease site and whether CT or simulator planning is employed. Most departments apply isocentric techniques and use immobilization and customized shielding. In vivo dosimetry is performed in 7 centres and treatment verification occurs in 24 hospitals. In conclusion, the planning and delivery of treatment for lymphoma patients varies across the country. Conventional planning is still widespread but most centres are moving to CT-based planning and virtual simulation with extended use of immobilization, customized shielding and compensation.

  13. Golden Eagle Monitoring Plan for the Desert Renewable Energy Conservation Plan

    USGS Publications Warehouse

    Wiens, David; Kolar, Patrick; Katzner, Todd

    2018-01-01

    This report describes options for monitoring the status and population trends of the golden eagle (Aquila chrysaetos) within the Desert Renewable Energy Conservation Plan (DRECP) area of Southern California in maintaining stable or increasing population in the planning area. The report profiles the ecology of golden eagles in the region and provides a range of potential sampling options to address monitoring needs and objectives. This approach also focused on links between changes in human land-use, golden eagle nesting and foraging habitat conditions, and population dynamics. The report outlines how monitoring data from demographic, prey, and habitat studies were used to develop a predictive demographic model for golden eagles in the DRECP area. Results from the model simulations suggest increases in renewable energy development could have negative consequences for population trajectories. Results also suggest site-specific conservation actions could reduce the magnitude of negative impacts to the local population of eagles. A monitoring framework is proposed including: (1) annual assessments of site-occupancy and reproduction by territorial pairs of golden eagles (including rates at which sites become colonized or vacated over time); (2) estimates of survival, movements, and intensity of use of landscapes by breeding and non-breeding golden eagles; (3) periodic (conducted every two to four years) assessments of nesting and foraging habitats, prey populations, and associations with land-use and management activities; and (4) updating the predictive demographic model with new information obtained on eagles and associated population stressors. The results of this research were published in the Journal of Rapture Research, Wiens, David,Inman, Rich D., Esque, Todd C., Longshore, Kathleen M. and Nussear, Kenneth (2017). Spatial Demographic Models to Inform Conservation Planning of Golden Eagles in Renewable Energy Landscapes. 51(3):234-257.

  14. Guidelines for treatment naming in radiation oncology

    PubMed Central

    Shields, Lisa B. E.; Hahl, Michael; Maudlin, Casey; Bassett, Mark; Spalding, Aaron C.

    2015-01-01

    Safety concerns may arise from a lack of standardization and ambiguity during the treatment planning and delivery process in radiation therapy. A standardized target and organ‐at‐risk naming convention in radiation therapy was developed by a task force comprised of several Radiation Oncology Societies. We present a nested‐survey approach in a community setting to determine the methodology for radiation oncology departments to standardize their practice. Our Institution's continuous quality improvement (CQI) committee recognized that, due to growth from one to three centers, significant variability existed within plan parameters specific to patients’ treatment. A multidiscipline, multiclinical site consortium was established to create a guideline for standard naming. Input was gathered using anonymous, electronic surveys from physicians, physicists, dosimetrists, chief therapists, and nurse managers. Surveys consisted of several primary areas of interest: anatomical sites, course naming, treatment plan naming, and treatment field naming. Additional concepts included capitalization, specification of laterality, course naming in the event of multiple sites being treated within the same course of treatment, primary versus boost planning, the use of bolus, revisions for plans, image‐guidance field naming, forbidden characters, and standard units for commonly used physical quantities in radiation oncology practice. Guidelines for standard treatment naming were developed that could be readily adopted. This multidisciplinary study provides a clear, straightforward, and easily implemented protocol for the radiotherapy treatment process. Standard nomenclature facilitates the safe means of communication between team members in radiation oncology. The guidelines presented in this work serve as a model for radiation oncology clinics to standardize their practices. PACS number(s): 87.56.bd, 87.56.Fc, 87.55.Qr, 87.55.‐x, 87.55.N‐, 87.55.T‐, 87.55.D‐ PMID:27074449

  15. Global Tobacco Surveillance System (GTSS): purpose, production, and potential.

    PubMed

    2005-01-01

    The World Health Organization (WHO), Centers for Disease Control and Prevention (CDC), and Canadian Public Health Association (CPHA) developed the Global Tobacco Surveillance System (GTSS) to assist all 192 WHO Member States in collecting data on youth and adult tobacco use. The flexible GTSS system includes common data items but allows countries to include important unique information at their discretion. It uses a common survey methodology, similar field procedures for data collection, and similar data management and processing techniques. The GTSS includes collection of data through three surveys: the Global Youth Tobacco Survey (GYTS) for youth, and the Global School Personnel Survey (GSPS) and the Global Health Professional Survey (GHPS) for adults. GTSS data potentially can be applied in four ways. First, countries and research partners can disseminate data through publications, presentations, and an active GTSS web site. Second, countries can use GTSS data to inform politicians about the tobacco problem in their country, leading to new policy decisions to prevent and control tobacco use. Third, GTSS can provide countries with valuable feedback to evaluate and improve Country National Action Plans or develop new plans. Fourth, in response to the WHO FCTC call for countries to use consistent methods and procedures in their surveillance efforts, GTSS offers such consistency in sampling procedures, core questionnaire items, training infield procedures, and analysis of data across all survey sites. The GTSS represents the most comprehensive tobacco surveillance system ever developed and implemented. As an example, this paper describes development of the GYTS and discusses potential uses of the data. Sample data were drawn from 38 sites in 24 countries in the African Region, 82 sites in 35 countries in the Americas Region, 20 sites in 17 countries and the Gaza Strip/West Bank region in the Eastern Mediterranean Region, 25 sites in 22 countries in the European Region, 34 sites in six countries in the Southeast Asia Region, and 25 sites in 14 countries in the Western Pacific Region.

  16. Systematic development and implementation of interventions to OPtimise Health Literacy and Access (Ophelia).

    PubMed

    Beauchamp, Alison; Batterham, Roy W; Dodson, Sarity; Astbury, Brad; Elsworth, Gerald R; McPhee, Crystal; Jacobson, Jeanine; Buchbinder, Rachelle; Osborne, Richard H

    2017-03-03

    The need for healthcare strengthening to enhance equity is critical, requiring systematic approaches that focus on those experiencing lesser access and outcomes. This project developed and tested the Ophelia (OPtimising HEalth LIteracy and Access) approach for co-design of interventions to improve health literacy and equity of access. Eight principles guided this development: Outcomes focused; Equity driven, Needs diagnosis, Co-design, Driven by local wisdom, Sustainable, Responsive and Systematically applied. We report the application of the Ophelia process where proof-of-concept was defined as successful application of the principles. Nine sites were briefed on the aims of the project around health literacy, co-design and quality improvement. The sites were rural/metropolitan, small/large hospitals, community health centres or municipalities. Each site identified their own priorities for improvement; collected health literacy data using the Health Literacy Questionnaire (HLQ) within the identified priority groups; engaged staff in co-design workshops to generate ideas for improvement; developed program-logic models; and implemented their projects using Plan-Do-Study-Act (PDSA) cycles. Evaluation included assessment of impacts on organisations, practitioners and service users, and whether the principles were applied. Sites undertook co-design workshops involving discussion of service user needs informed by HLQ (n = 813) and interview data. Sites generated between 21 and 78 intervention ideas and then planned their selected interventions through program-logic models. Sites successfully implemented interventions and refined them progressively with PDSA cycles. Interventions generally involved one of four pathways: development of clinician skills and resources for health literacy, engagement of community volunteers to disseminate health promotion messages, direct impact on consumers' health literacy, and redesign of existing services. Evidence of application of the principles was found in all sites. The Ophelia approach guided identification of health literacy issues at each participating site and the development and implementation of locally appropriate solutions. The eight principles provided a framework that allowed flexible application of the Ophelia approach and generation of a diverse set of interventions. Changes were observed at organisational, staff, and community member levels. The Ophelia approach can be used to generate health service improvements that enhance health outcomes and address inequity of access to healthcare.

  17. Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and Land Use Map. USACOE, 31 December 1954 - Fort Custer Military Reservation, Bounded by Territorial, Dickman, & Longman Roads & Route 94 Business, Battle Creek, Calhoun County, MI

  18. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  19. Vadose zone transport field study: Detailed test plan for simulated leak tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    AL Ward; GW Gee

    2000-06-23

    The US Department of Energy (DOE) Groundwater/Vadose Zone Integration Project Science and Technology initiative was created in FY 1999 to reduce the uncertainty associated with vadose zone transport processes beneath waste sites at DOE's Hanford Site near Richland, Washington. This information is needed not only to evaluate the risks from transport, but also to support the adoption of measures for minimizing impacts to the groundwater and surrounding environment. The principal uncertainties in vadose zone transport are the current distribution of source contaminants and the natural heterogeneity of the soil in which the contaminants reside. Oversimplified conceptual models resulting from thesemore » uncertainties and limited use of hydrologic characterization and monitoring technologies have hampered the understanding contaminant migration through Hanford's vadose zone. Essential prerequisites for reducing vadose transport uncertainly include the development of accurate conceptual models and the development or adoption of monitoring techniques capable of delineating the current distributions of source contaminants and characterizing natural site heterogeneity. The Vadose Zone Transport Field Study (VZTFS) was conceived as part of the initiative to address the major uncertainties confronting vadose zone fate and transport predictions at the Hanford Site and to overcome the limitations of previous characterization attempts. Pacific Northwest National Laboratory (PNNL) is managing the VZTFS for DOE. The VZTFS will conduct field investigations that will improve the understanding of field-scale transport and lead to the development or identification of efficient and cost-effective characterization methods. Ideally, these methods will capture the extent of contaminant plumes using existing infrastructure (i.e., more than 1,300 steel-cased boreholes). The objectives of the VZTFS are to conduct controlled transport experiments at well-instrumented field sites at Hanford to: identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford's waste disposal sites; reduce uncertainty in conceptual models; develop a detailed and accurate database of hydraulic and transport parameters for validation of three-dimensional numerical models; identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. This plan provides details for conducting field tests during FY 2000 to accomplish these objectives. Details of additional testing during FY 2001 and FY 2002 will be developed as part of the work planning process implemented by the Integration Project.« less

  20. 34. Site Plan: Fort Custer Air Force Station, Fort Custer, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Site Plan: Fort Custer Air Force Station, Fort Custer, Michigan, Modification of Electrical Distribution, General Site Plan, USACOE, no date. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  1. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding to...

  2. School Sites: Selection, Development and Utilization. Educational Facilities Series: A Guide to Planning.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton. Bureau of Facility Planning.

    School sites are an integral part of educational facilities. Modern educational programs emphasize the discovery approach to learning where pupils do more than just read about the world around them. For example, they become active explorers and participate in discovering nature and how best to enjoy it and care for it. Thus, there is a curricular…

  3. 75 FR 19422 - Availability of a Final Environmental Impact Statement for the General Management Plan (FEIS/GMP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ..., use, and development options for the historic site by the NPS for the next 15 to 20 years. It... no major changes in direction. Alternative B emphasizes the natural environment by keeping the site... emphasis on the natural environment outside of the core historic and visitor areas. Alternative D is the...

  4. Strategic planning: the basics and benefits.

    PubMed

    Hansen, R D

    1999-01-01

    Strategic planning can help a medical practice take an honest look at itself in light of the changes taking place in its environment and within the practice itself. The objective is for the group to design a plan, or road map, to its envisioned future. For medical practices, strategic planning is a four part process: 1) gaining buy-in for the process itself from the leadership and physicians; 2) gathering pertinent data about the group's environment through external resources, and about the group itself through interviews and surveys of physicians; 3) conducting a facilitated off-site retreat of key physicians and leaders in order to review data, discuss issues and develop a one to two year action plan; and, 4) carrying out the action plan developed at the retreat and measuring its outcomes. A follow-up mini-retreat about six months after the first retreat is highly recommended, as is instituting a process of sharing of the results and outcomes of the plan with all members of the organization.

  5. Computer-based planning of optimal donor sites for autologous osseous grafts

    NASA Astrophysics Data System (ADS)

    Krol, Zdzislaw; Chlebiej, Michal; Zerfass, Peter; Zeilhofer, Hans-Florian U.; Sader, Robert; Mikolajczak, Pawel; Keeve, Erwin

    2002-05-01

    Bone graft surgery is often necessary for reconstruction of craniofacial defects after trauma, tumor, infection or congenital malformation. In this operative technique the removed or missing bone segment is filled with a bone graft. The mainstay of the craniofacial reconstruction rests with the replacement of the defected bone by autogeneous bone grafts. To achieve sufficient incorporation of the autograft into the host bone, precise planning and simulation of the surgical intervention is required. The major problem is to determine as accurately as possible the donor site where the graft should be dissected from and to define the shape of the desired transplant. A computer-aided method for semi-automatic selection of optimal donor sites for autografts in craniofacial reconstructive surgery has been developed. The non-automatic step of graft design and constraint setting is followed by a fully automatic procedure to find the best fitting position. In extension to preceding work, a new optimization approach based on the Levenberg-Marquardt method has been implemented and embedded into our computer-based surgical planning system. This new technique enables, once the pre-processing step has been performed, selection of the optimal donor site in time less than one minute. The method has been applied during surgery planning step in more than 20 cases. The postoperative observations have shown that functional results, such as speech and chewing ability as well as restoration of bony continuity were clearly better compared to conventionally planned operations. Moreover, in most cases the duration of the surgical interventions has been distinctly reduced.

  6. Factors influencing the provision of long-acting reversible contraception in California.

    PubMed

    Biggs, M Antonia; Harper, Cynthia C; Malvin, Jan; Brindis, Claire D

    2014-03-01

    To assess long-acting reversible contraception (LARC) beliefs and practices among site directors who represent the family planning services delivered in their practices. Medical directors from 1,000 sites listed in the Family Planning Access Care and Treatment program (California's family planning Medicaid program) provider database were mailed a survey in the fall of 2011 regarding their LARC beliefs and practices. Participants responded by mail, online, or telephone. Data on family planning clients served and LARC dispensing were obtained from administrative claims data. All analyses were limited to advanced practice clinician respondents. General estimating equation models identified the respondent and practice characteristics associated with LARC provision. After three follow-up mailings and telephone calls, 68% of eligible sites responded to the survey (636/939). Most respondents were physicians (448/587). They were most likely to consider women with a history of pelvic inflammatory disease unsuitable for hormonal (27%, n=161) and copper (26%, n=154) intrauterine devices. Smokers were the most likely to be considered unsuitable for the implant (16%, n=96). Nearly three fourths of respondents routinely discussed intrauterine devices (413/561) and half (271/558) discussed implants with their contraceptive patients. Characteristics that predicted onsite LARC provision included LARC training, beliefs, and health care provider type. Although there has been significant progress in expanding access and understanding about LARC, many clinicians from sites offering family planning services held beliefs limiting the provision of intrauterine devices and were unfamiliar with the implant, suggesting the need for targeted trainings aimed at informing clinicians of recent developments in LARC recommendations.

  7. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  8. Corrective Action Investigation Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada with ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature andmore » extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of contamination at CAU 541 will be evaluated based on information collected from field investigations. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less

  9. Science, policy, and stakeholders: developing a consensus science plan for Amchitka Island, Aleutians, Alaska.

    PubMed

    Burger, Joanna; Gochfeld, Michael; Kosson, David S; Powers, Charles W; Friedlander, Barry; Eichelberger, John; Barnes, David; Duffy, Lawrence K; Jewett, Stephen C; Volz, Conrad D

    2005-05-01

    With the ending of the Cold War, the US Department of Energy is responsible for the remediation of radioactive waste and disposal of land no longer needed for nuclear material production or related national security missions. The task of characterizing the hazards and risks from radionuclides is necessary for assuring the protection of health of humans and the environment. This is a particularly daunting task for those sites that had underground testing of nuclear weapons, where the radioactive contamination is currently inaccessible. Herein we report on the development of a Science Plan to characterize the physical and biological marine environment around Amchitka Island in the Aleutian chain of Alaska, where three underground nuclear tests were conducted (1965-1971). Information on the ecology, geology, and current radionuclide levels in biota, water, and sediment is necessary for evaluating possible current contamination and to serve as a baseline for developing a plan to ensure human and ecosystem health in perpetuity. Other information required includes identifying the location of the salt water/fresh water interface where migration to the ocean might occur in the future and determining groundwater recharge balances, as well as assessing other physical/geological features of Amchitka near the test sites. The Science Plan is needed to address the confusing and conflicting information available to the public about radionuclide risks from underground nuclear blasts in the late 1960s and early 1970s, as well as the potential for volcanic or seismic activity to disrupt shot cavities or accelerate migration of radionuclides into the sea. Developing a Science Plan involved agreement among regulators and other stakeholders, assignment of the task to the Consortium for Risk Evaluation with Stakeholder Participation, and development of a consensus Science Plan that dealt with contentious scientific issues. Involvement of the regulators (State of Alaska), resource trustees (U S Fish and Wildlife Service), representatives of the Aleut and Pribilof Island communities, and other stakeholders was essential for plan development and approval, although this created tensions because of the different objectives of each group. The complicated process of developing a Science Plan involved iterations and interactions with multiple agencies and organizations, scientists in several disciplines, regulators, and the participation of Aleut people in their home communities, as well as the general public. The importance of including all parties in all phases of the development of the Science Plan was critical to its acceptance by a broad range of regulators, agencies, resource trustees, Aleutian/Pribilof communities, and other stakeholders.

  10. Liquid secondary waste. Waste form formulation and qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A. D.; Dixon, K. L.; Hill, K. A.

    The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during Site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilization Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the Integrated Disposal Facility IDF). Waste form testingmore » to support this plan is composed of work in the near term to demonstrate the waste form will provide data as input to a performance assessment (PA) for Hanford’s IDF.« less

  11. Trip generation at special sites.

    DOT National Transportation Integrated Search

    1984-01-01

    Seven-day volume counts were made at fast-food restaurants with drive-thru service, convenience markets, condominiums, drive-in banks, high-rise apartments, planned unit developments, mobile home parks, day-care centers, churches, suburban motels, an...

  12. Special Needs: Planning for Adulthood (Videos)

    MedlinePlus Videos and Cool Tools

    ... for Parents Parents site Sitio para padres General Health Growth & Development Infections Diseases & Conditions Pregnancy & Baby Nutrition & ... Growing Up Staying Healthy Staying Safe Recipes & Cooking Health Problems Illnesses & Injuries Relax & Unwind People, Places & Things ...

  13. Harvard Community Health Plan's Mental Health Redesign Project: a managerial and clinical partnership.

    PubMed

    Abrams, H S

    1993-01-01

    Harvard Community Health Plan, founded in 1969 as a staff model HMO, is currently a staff and group model HMO with 521,000 members, 19 health centers and 12 independently owned group practices with 26 locations. In 1987, the Plan initiated a review of its mental health benefit and program because its costs were rising, member and clinician dissatisfaction was increasing and many believed the problem was the nature and scope of the benefit. After two years of study, surveys, interviews, cost and utilization analysis, the Plan identified its professional staff as its key asset but recognized many problem areas, including problems with access, variation from site to site, inconsistent service delivery, lack of consistent utilization management and the need for greater diversity along the spectrum of care available to members. From 1989 to 1990, more than 200 clinicians and support staff were engaged in the process of developing a variety of components to the "mental health redesign program." Three simultaneous efforts included developing a method of categorizing patients, restructuring the delivery system and redesigning the benefit. A Mental Health Patient Assessment Tool was created which assists clinicians in performing comprehensive evaluations, administers the benefit, measures progress and supports outcomes research. Delivery system changes included the implementation of self-referral, access standards, intake triage functions by non-clinical staff, program development and an outpatient utilization management function.

  14. On-Site Inspection RadioIsotopic Spectroscopy (Osiris) System Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caffrey, Gus J.; Egger, Ann E.; Krebs, Kenneth M.

    2015-09-01

    We have designed and tested hardware and software for the acquisition and analysis of high-resolution gamma-ray spectra during on-site inspections under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The On-Site Inspection RadioIsotopic Spectroscopy—Osiris—software filters the spectral data to display only radioisotopic information relevant to CTBT on-site inspections, e.g.,132I. A set of over 100 fission-product spectra was employed for Osiris testing. These spectra were measured, where possible, or generated by modeling. The synthetic test spectral compositions include non-nuclear-explosion scenarios, e.g., a severe nuclear reactor accident, and nuclear-explosion scenarios such as a vented underground nuclear test. Comparing its computer-based analyses to expert visual analysesmore » of the test spectra, Osiris correctly identifies CTBT-relevant fission product isotopes at the 95% level or better.The Osiris gamma-ray spectrometer is a mechanically-cooled, battery-powered ORTEC Transpec-100, chosen to avoid the need for liquid nitrogen during on-site inspections. The spectrometer was used successfully during the recent 2014 CTBT Integrated Field Exercise in Jordan. The spectrometer is controlled and the spectral data analyzed by a Panasonic Toughbook notebook computer. To date, software development has been the main focus of the Osiris project. In FY2016-17, we plan to modify the Osiris hardware, integrate the Osiris software and hardware, and conduct rigorous field tests to ensure that the Osiris system will function correctly during CTBT on-site inspections. The planned development will raise Osiris to technology readiness level TRL-8; transfer the Osiris technology to a commercial manufacturer, and demonstrate Osiris to potential CTBT on-site inspectors.« less

  15. 7 CFR 1924.106 - Location.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Location. 1924.106 Section 1924.106 Agriculture... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.106 Location. (a) General. It is... will not finance development on locations that adversely affect properties which are listed or are...

  16. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  17. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  18. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  19. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  20. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  1. The systematic development of ROsafe: an intervention to promote STI testing among vocational school students.

    PubMed

    Wolfers, Mireille; de Zwart, Onno; Kok, Gerjo

    2012-05-01

    This article describes the development of ROsafe, an intervention to promote sexually transmitted infection (STI) testing at vocational schools in the Netherlands. Using the planning model of intervention mapping (IM), an educational intervention was designed that consisted of two lessons, an Internet site, and sexual health services at the school sites. IM is a stepwise approach for theory- and evidence-based development and implementation of interventions. It includes six steps: needs assessment, specification of the objectives in matrices, selection of theoretical methods and practical strategies, program design, implementation planning, and evaluation. The processes and outcomes that are performed during Steps 1 to 4 of IM are presented, that is, literature review and qualitative and quantitative research in needs assessment, leading to the definition of the desired behavioral outcomes and objectives. The matrix of change objectives for STI-testing behavior is presented, and then the development of theory into program is described, using examples from the program. Finally, the planning for implementation and evaluation is discussed. The educational intervention used methods that were derived from the social cognitive theory, the elaboration likelihood model, the persuasive communication matrix, and theories about risk communication. Strategies included short movies, discussion, knowledge quiz, and an interactive behavioral self-test through the Internet.

  2. Designing sustainable and economically attractive brownfield revitalization options using an integrated assessment model.

    PubMed

    Schädler, S; Morio, M; Bartke, S; Rohr-Zänker, R; Finkel, M

    2011-03-01

    We describe the development of an integrated assessment model which evaluates redevelopment options of large contaminated brownfields and we present the application of the model in a case study. Aiming to support efficient and sustainable revitalization and communication between stakeholders, the presented assessment model integrates three pinnacles of brownfield revitalization: (i) subsurface remediation and site preparation costs, (ii) market-oriented economic appraisal, and (iii) the expected contribution of planned future land use to sustainable community and regional development. For the assessment, focus is set on the early stage of the brownfield redevelopment process, which is characterized by limited data availability and by flexibility in land use planning and development scope. At this stage, revealing the consequences of adjustments and alterations in planning options can foster efficiency in communication between the involved parties and thereby facilitates the brownfield revitalization process. Results from the case-study application indicate that the integrated assessment provides help in the identification of land use options beneficial in both a sustainable and an economical sense. For the study site it is shown on one hand that brownfield redevelopment is not automatically in line with sustainable regional development, and on the other hand it is demonstrated that additional contributions to sustainability are not intrinsically tied to increased costs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  3. Recent Developments on the Turbulence Modeling Resource Website (Invited)

    NASA Technical Reports Server (NTRS)

    Rumssey, Christopher L.

    2015-01-01

    The NASA Langley Turbulence Model Resource (TMR) website has been active for over five years. Its main goal of providing a one-stop, easily accessible internet site for up-to-date information on Reynolds-averaged Navier-Stokes turbulence models remains unchanged. In particular, the site strives to provide an easy way for users to verify their own implementations of widely-used turbulence models, and to compare the results from different models for a variety of simple unit problems covering a range of flow physics. Some new features have been recently added to the website. This paper documents the site's features, including recent developments, future plans, and open questions.

  4. Choosing indicators of natural resource condition: A case study in Arches National Park, Utah, USA

    USGS Publications Warehouse

    Belnap, J.

    1998-01-01

    Heavy visitor use in many areas of the world have necessitated development of ways to assess visitation impacts. Arches National Park recently completed a Visitor Experience and Resource Protection (VERP) plan. Integral to this plan was developing a method to identify biological indicators that would both measure visitor impacts and response to management actions. The process used in Arches for indicator selection is outlined here as a model applicable to many areas facing similar challenges. The steps were: (1) Vegetation types most used by visitors were identified. Impacted and unimpacted areas in these types were sampled, comparing vegetation and soil factors. (2) Variables found to differ significantly between compared sites were used as potential indicators. (3) Site-specific criteria for indicators were developed, and potential indicators evaluated using these criteria. (4) Chosen indicators were further researched for ecological relevancy. (5) Final indicators were chosen, field tested, and monitoring sites designated. In Arches, indicators were chosen for monitoring annually (soil crust index, soil compaction, number of used social trails and soil aggregate stability) and every five years (vegetation cover and frequency; ground cover; soil chemistry; and plant tissue chemistry).

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zoeller, William; Slattery, Matt; Grab, Joanna

    In 2009, Mass Development issued a RFP for teams to develop moderately priced high-efficiency homes on two sites within the Devens Regional Enterprise Zone. MassDevelopment, a Massachusetts agency that owns the Devens site (formerly Fort Devens Army Base, in Harvard, Massachusetts), set a goal of producing a replicable example of current and innovative sustainable building practices with a near-zero energy potential. Metric Development, as primary developer and construction manager, formed one of the successful teams that included CARB and Cambridge Seven Architects (C7A). This report describes the development of high performance, affordable, and replicable designs developed by the team inmore » test homes and plans to move forward with the next buildings.« less

  6. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  7. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  8. Handling the difficult Brownfields issues: A case study of privately funded remediation to residential standards update 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McLeod, D.P.; Ridley, A.P.

    Most Brownfields projects are based on either direct or indirect government funding. This paper describes a more unusual scenario: the remediation of a contaminated industrial site for re-use as residential property. Using the ASTM RBCA risk assessment methodology and an innovative fixed fee arrangement between Woodward-Clyde Consultants and the site owner, they developed and successfully implemented a plan to clean up the site to residential standards over a twelve (12) month time period.

  9. Statement by Dr. Raul A. Deju to the Subcommittee on Radioactive Waste, Energy and Utilities Committee, Washington State Senate, Richland, Washington, October 21, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deju, R.A.

    1982-10-01

    The Basalt Waste Isolation Project's mission is to assess whether or not a nuclear waste repository can be sited in the basalts beneath the Hanford Site. Dr. Deju summarizes the results of the siting studies, the activities connected with waste package development, and ongoing engineering studies. In addition, he gives a glimpse of past technical reviews of the project and comments on major technical activities planned in the near future.

  10. U.S. Geological Survey and Microsoft Cooperative Research and Development Agreement: Geospatial Data Browsing and Retrieval Site on the World Wide Web

    USGS Publications Warehouse

    ,

    1999-01-01

    In May 1997, the U.S. Geological Survey (USGS) and the Microsoft Corporation of Redmond, Wash., entered into a cooperative research and development agreement (CRADA) to make vast amounts of geospatial data available to the general public through the Internet. The CRADA is a 36-month joint effort to develop a general, public-oriented browsing and retrieval site for geospatial data on the Internet. Specifically, Microsoft plans to (1) modify a large volume of USGS geospatial data so the images can be displayed quickly and easily over the Internet, (2) implement an easy-to-use interface for low-speed connections, and (3) develop an Internet Web site capable of servicing millions of users per day.

  11. U.S. Geological Survey and Microsoft Cooperative Research and Development Agreement: Geospatial Data Browsing and Retrieval Site on the World Wide Web

    USGS Publications Warehouse

    ,

    1998-01-01

    In May 1997, the U.S. Geological Survey (USGS) and the Microsoft Corporation of Redmond, Wash., entered into a cooperative research and development agreement (CRADA) to make vast amounts of geospatial data available to the general public through the Internet. The CRADA is a 36-month joint effort to develop a general, public-oriented browsing and retrieval site for geospatial data on the Internet. Specifically, Microsoft plans to (1) modify a large volume of USGS geospatial data so the images can be displayed quickly and easily over the Internet, (2) implement an easy-to-use interface for low-speed connections, and (3) develop an Internet Web site capable of servicing millions of users per day.

  12. Status of the NRC Decommissioning Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orlando, D. A.; Camper, L.; Buckley, J.

    2003-02-24

    On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submitmore » Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.« less

  13. Ecohealth System Dynamic Model as a Planning Tool for the Reduction of Breeding Sites

    NASA Astrophysics Data System (ADS)

    Respati, T.; Raksanagara, A.; Djuhaeni, H.; Sofyan, A.; Shandriasti, A.

    2017-03-01

    Dengue is still one of major health problem in Indonesia. Dengue transmission is influenced by dengue prevention and eradication program, community participation, housing environment and climate. The complexity of the disease coupled with limited resources necessitates different approach for prevention methods that include factors contribute to the transmission. One way to prevent the dengue transmission is by reducing the mosquito’s breeding sites. Four factors suspected to influence breeding sites are dengue prevention and eradication program, community participation, housing environment, and weather condition. In order to have an effective program in reducing the breeding site it is needed to have a model which can predict existence of the breeding sites while the four factors under study are controlled. The objective of this study is to develop an Ecohealth model using system dynamic as a planning tool for the reduction of breeding sites to prevent dengue transmission with regard to dengue prevention and eradication program, community participation, housing environment, and weather condition. The methodology is a mixed method study using sequential exploratory design. The study comprised of 3 stages: first a qualitative study to 14 respondents using in-depth interview and 6 respondents for focus group discussion. The results from the first stage was used to develop entomology and household survey questionnaires for second stage conducted in 2036 households across 12 sub districts in Bandung City. Ecohealth system dynamic model was developed using data from first and second stages. Analyses used are thematic analysis for qualitative data; spatial, generalized estimating equation (GEE) and structural equation modeling for quantitative data; also average mean error (AME) and average variance error (AVE) for dynamic system model validation. System dynamic model showed that the most effective approach to eliminate breeding places was by ensuring the availability of basic sanitation for all houses. Weather factors such as precipitation can be compensated with the eradication of breeding sites activities which is conducted as scheduled and at the same time for the whole areas. Conclusion of this study is that dengue prevention and eradication program, community participation, and housing environment contributed to breeding places elimination influenced the existence of the breeding sites. The availability of basic sanitation and breeding places eradication program done timely and collectively are the most effective approach to eradicate breeding sites. Ecohealth dynamic system model can be used as a tool for the planning of breeding sites eradication program to prevent disease transmissions at city level.

  14. 39. Photo copy of site plan, (original in Forest Service ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photo copy of site plan, (original in Forest Service Office, Elkins, WV, 'Parsons Nursery Special Use Permit, West Virginia Department of Natural Resources'), 1969. PARSONS NURSERY SITE PLAN. CORROLATES TO PARSONS NURSERY AT TIME OF FLOOD, NOVEMBER, 1985. - Parsons Nursery, South side of U.S. Route 219, Parsons, Tucker County, WV

  15. 7 Steps to Better Reading--A Districtwide Approach

    ERIC Educational Resources Information Center

    Scroggins, John; Powers, Linda

    2004-01-01

    The Ponca City (Okla.) Public Schools set a higher literacy level as a goal, then developed a comprehensive plan to achieve that goal. A district focus, commitment, professional development for administrators and teachers, assessments to drive instruction, on-site coaching, monitoring, and careful record keeping all contributed to systemic reform.

  16. UNIVERSITY RESEARCH BUILDINGS FOR SHORT-TERM GRANT PROGRAMS.

    ERIC Educational Resources Information Center

    KINNE, W.S., JR.

    GUIDELINES WERE ESTABLISHED TO ASSIST IN THE PLANNING AND DEVELOPMENT OF ADEQUATE FACILITIES FOR SHORT-TERM RESEARCH GRANT PROGRAMS. FUNCTIONAL CRITERIA WERRE DEVELOPED FROM THE ANALYSES OF COST STUDIES AND A SURGE SPACE STUDY AT THE UNIVERSITY OF ILLINOIS. ALTERNATIVES WERE SUGGESTED FOR THE PROVISION, PHYSICAL CHARACTERISTICS, SITE LOCATION,…

  17. Colorado geothermal commercialization program: community development of geothermal energy in Pagosa Springs, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coe, B.A.

    1980-01-01

    A district heating system for the Pagosa Springs central business district is in the planning stage. A detailed analysis of the project is presented. It comprises area and site specific studies and describes in detail the recent, current, anticipated, and postulated geothermal development activities. (MHR)

  18. Pathways to the Outdoor Classroom.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Natural Resources, St. Paul. Bureau of Information and Education.

    This bibliography is designed to assist educators in establishing an outdoor classroom for environmental education. A process is detailed by which school districts can effectively and efficiently develop a site on or near the school. The first step involves organizing a planning committee, enlisting administrative support, and developing a budget.…

  19. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less

  20. ORD'S BROWNFIELDS RESEARCH

    EPA Science Inventory

    SMARTe is a web-based,decision support tool for developing and evaluating plans for redevelopment/revitalization of potentially contaminated sites. Brownfield project stakeholders should use SMARTe to: (1) Assess both market and non-market costs and benefits of potential redevelo...

  1. Seagrass mitigation site modeling and assessment : [summary].

    DOT National Transportation Integrated Search

    2013-05-01

    As a result of awareness of wetlands importance, community master plans define areas to develop and others to preserve; however, sensitive coastal ecosystems can still suffer impacts, directly, through physical disturbance, or indirectly, by exces...

  2. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    PubMed

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  3. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    PubMed Central

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D’Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T.; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-01-01

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site. PMID:27271622

  4. Monte Carlo treatment planning with modulated electron radiotherapy: framework development and application

    NASA Astrophysics Data System (ADS)

    Alexander, Andrew William

    Within the field of medical physics, Monte Carlo radiation transport simulations are considered to be the most accurate method for the determination of dose distributions in patients. The McGill Monte Carlo treatment planning system (MMCTP), provides a flexible software environment to integrate Monte Carlo simulations with current and new treatment modalities. A developing treatment modality called energy and intensity modulated electron radiotherapy (MERT) is a promising modality, which has the fundamental capabilities to enhance the dosimetry of superficial targets. An objective of this work is to advance the research and development of MERT with the end goal of clinical use. To this end, we present the MMCTP system with an integrated toolkit for MERT planning and delivery of MERT fields. Delivery is achieved using an automated "few leaf electron collimator" (FLEC) and a controller. Aside from the MERT planning toolkit, the MMCTP system required numerous add-ons to perform the complex task of large-scale autonomous Monte Carlo simulations. The first was a DICOM import filter, followed by the implementation of DOSXYZnrc as a dose calculation engine and by logic methods for submitting and updating the status of Monte Carlo simulations. Within this work we validated the MMCTP system with a head and neck Monte Carlo recalculation study performed by a medical dosimetrist. The impact of MMCTP lies in the fact that it allows for systematic and platform independent large-scale Monte Carlo dose calculations for different treatment sites and treatment modalities. In addition to the MERT planning tools, various optimization algorithms were created external to MMCTP. The algorithms produced MERT treatment plans based on dose volume constraints that employ Monte Carlo pre-generated patient-specific kernels. The Monte Carlo kernels are generated from patient-specific Monte Carlo dose distributions within MMCTP. The structure of the MERT planning toolkit software and optimization algorithms are demonstrated. We investigated the clinical significance of MERT on spinal irradiation, breast boost irradiation, and a head and neck sarcoma cancer site using several parameters to analyze the treatment plans. Finally, we investigated the idea of mixed beam photon and electron treatment planning. Photon optimization treatment planning tools were included within the MERT planning toolkit for the purpose of mixed beam optimization. In conclusion, this thesis work has resulted in the development of an advanced framework for photon and electron Monte Carlo treatment planning studies and the development of an inverse planning system for photon, electron or mixed beam radiotherapy (MBRT). The justification and validation of this work is found within the results of the planning studies, which have demonstrated dosimetric advantages to using MERT or MBRT in comparison to clinical treatment alternatives.

  5. Development of a requirements management system for technical decision - making processes in the geological disposal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama

    2007-07-01

    NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less

  6. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one ormore » more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.« less

  7. Deriving Forest Harvesting Machine Productivity from Positional Data

    Treesearch

    T.P. McDonald; S.E. Taylor; R.B. Rummer

    2000-01-01

    Automated production study systems will provide researchers a valuable tool for developing cost and impact models of forest operations under a wide range of conditions, making the development of true planning tools for tailoring logging systems to a particular site a reality. An automated time study system for skidders was developed, and in this study application of...

  8. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suber, Gregory

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less

  9. Poster - Thur Eve - 54: A software solution for ongoing DVH quality assurance in radiation therapy.

    PubMed

    Annis, S-L; Zeng, G; Wu, X; Macpherson, M

    2012-07-01

    A program has been developed in MATLAB for use in quality assurance of treatment planning of radiation therapy. It analyzes patient DVH files and compiles dose volume data for review, trending, comparison and analysis. Patient DVH files are exported from the Eclipse treatment planning system and saved according to treatment sites and date. Currently analysis is available for 4 treatment sites; Prostate, Prostate Bed, Lung, and Upper GI, with two functions for data report and analysis: patient-specific and organ-specific. The patient-specific function loads one patient DVH file and reports the user-specified dose volume data of organs and targets. These data can be compiled to an external file for a third party analysis. The organ-specific function extracts a requested dose volume of an organ from the DVH files of a patient group and reports the statistics over this population. A graphical user interface is utilized to select clinical sites, function and structures, and input user's requests. We have implemented this program in planning quality assurance at our center. The program has tracked the dosimetric improvement in GU sites after VMAT was implemented clinically. It has generated dose volume statistics for different groups of patients associated with technique or time range. This program allows reporting and statistical analysis of DVH files. It is an efficient tool for the planning quality control in radiation therapy. © 2012 American Association of Physicists in Medicine.

  10. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  11. Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Middleman, L.I.

    1990-06-01

    This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less

  12. Site Plan, Brief History, Site Elevation, Main Gate Detail, Southern ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan, Brief History, Site Elevation, Main Gate Detail, Southern Live Oak (Quercus Virginiana) Information - Main Gate and Auburn Oaks at Toomer's Corner, Entrance to Auburn University's Campus, Intersection of West Magnolia Avenue and South College Street, Auburn, Lee County, AL

  13. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  14. Pax: A permanent base for human habitation of Mars

    NASA Technical Reports Server (NTRS)

    Moore, Gary T.; Rebholz, Patrick J.; Fieber, Joseph P.; Huebner-Moths, Janis; Paruleski, Kerry L.

    1992-01-01

    The Advanced Design Program in Space Architecture at the University of Wisconsin-Milwaukee supported the synthesis report and two of its scenarios - 'Architecture 1' and 'Architecture 4' - and the Weaver ExPO report on near-term extraterrestrial explorations during the spring of 1992. The project investigated the implications of different mission scenarios, the Martian environment, supporting technologies, and especially human factors and environment-behavior considerations for the design of the first permanent Martian base. This paper presents the results of that investigation. The paper summarizes site selection, development of habitability design requirements based on environment-behavior research, construction sequencing, and a full concept design and design development for a first permanent Martian base and habitat. The proposed design is presented in terms of an integrative mission scenario and master plan phased through initial operational configuration, base site plan, and design development details of a complete Martian habitat for 18 crew members including all laboratory, mission control, and crew support spaces.

  15. Assessing Climate Vulnerabilities of Food Distribution Center Sites in Greater Boston and Their Regional Implications: Climate Adaptation Planning in Practice

    NASA Astrophysics Data System (ADS)

    Teferra, A.; Watson, C.; Douglas, E. M.

    2016-12-01

    The Metro Boston region, an area whose civic leaders have been at the forefront of climate resilience initiatives in recent years, is finalizing a flood vulnerability assessment of food distribution center sites located north of Boston, with the support of the University of Massachusetts Boston and the American Geophysical Union's Thriving Earth Exchange program. The community-scientist collaboration emerged because of the need for more local analyses of the area to inform climate resiliency policy and planning actions for the region. A significant amount of the metro region's food supply passes through two major distribution centers in the cities of Everett and Chelsea, just north of the Mystic River. The Metropolitan Area Planning Council (MAPC), on behalf of the Metro Boston Climate Preparedness Taskforce, is working with Chris Watson and Ellen Douglas of UMass Boston to build on existing analyses of the region's food system and climate vulnerabilities and to develop a report identifying flood risk exposure to the sites. The analysis brings in dynamic modeling techniques that incorporate storm surge and sea level rise projections under different climate scenarios, and aims to align methodologies with those of other regional analyses, such as Climate Ready Boston and the City of Cambridge's Vulnerability Assessment. The study is helping to inform MAPC's and the Metro Boston Climate Preparedness Taskforce's understanding of this critical food distribution infrastructure, illustrate the larger regional implications of climate impacts on food distribution in the Greater Boston area, and guide the development of site-specific strategies for addressing identified vulnerabilities.

  16. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  17. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  18. AIRSAR South American deployment: Operation plan, version 3.0

    NASA Technical Reports Server (NTRS)

    Kobrick, M.

    1993-01-01

    The United States National Aeronautics and Space Administration (NASA) and the Brazilian Commission for Space Activities (COBAE) are undertaking a joint experiment involving NASA's DC-8 research aircraft and the Airborne Synthetic Aperture Radar (AIRSAR) system during late May and June 1993. The research areas motivating these activities are: (1) fundamental research in the role of soils, vegetation, and hydrology in the global carbon cycle; and (2) in cooperation with South American scientists, airborne remote sensing research for the upcoming NASA Spaceborne Imaging Radar (SIR)-C/X-SAR flights on the Space Shuttle. A flight schedule and plans for the deployment that were developed are included. Maps of the site locations and schematic indications of flight routes and dates, plots showing swath locations derived from the flight requests and generated by flight planning software, and, most importantly, a calendar showing which sites will be imaged each day are included.

  19. Landowner Attitudes and Perceptions of Impact from Wind and Natural Gas Development in Northern Pennsylvania: Implications for Energy Landscapes in Rural America

    NASA Astrophysics Data System (ADS)

    Jacquet, Jeffrey Bryan

    Energy developments such as industrial scale wind farms and unconventional natural gas drilling represent some of the largest and most controversial land use changes occurring in the United States today. A diverse array of academic disciplines have each sought to explain the social, psychological, and economic effects of siting large industrial facilities in rural areas, however the research has largely remained discipline-specific. This study measures resident attitudes and perceptions of impact from both wind and gas drilling occurring simultaneously in the Armenia Mountain Area of northern Pennsylvania. The results of a mail survey of landowners (n = 1028) in this study area reveal factors that explain landowner variation in attitudes and perception of impact, and describe new forms of participation in the planning and siting of these energy projects. Direction is provided for a new and synthetic theoretical understanding of how residents perceive these impacts and impacts from land use change. The work advances “risk of social and psychological disruption” as a key factor that may influence how residents respond to the prospect of large land use changes. Implications for the regulation and planning of these energy sources are offered, including a new understanding of how landowners participate in the planning and siting of large energy projects. Finally, the limitations of this work, as well as opportunities and implications for future research, are discussed.

  20. Renewable Energy Zones for Balancing Siting Trade-offs in India

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deshmukh, Ranjit; Wu, Grace C.; Phadke, Amol

    India’s targets of 175 GW of renewable energy capacity by 2022, and 40% generation capacity from non-fossil fuel sources by 2030 will require a rapid and dramatic increase in solar and wind capacity deployment and overcoming its associated economic, siting, and power system challenges. The objective of this study was to spatially identify the amount and quality of wind and utility-scale solar resource potential in India, and the possible siting-related constraints and opportunities for development of renewable resources. Using the Multi-criteria Analysis for Planning Renewable Energy (MapRE) methodological framework, we estimated several criteria valuable for the selection of sites formore » development for each identified potential "zone", such as the levelized cost of electricity, distance to nearest substation, capacity value (or the temporal matching of renewable energy generation to demand), and the type of land cover. We find that high quality resources are spatially heterogeneous across India, with most wind and solar resources concentrated in the southern and western states, and the northern state of Rajasthan. Assuming India's Central Electricity Regulatory Commission's norms, we find that the range of levelized costs of generation of wind and solar PV resources overlap, but concentrated solar power (CSP) resources can be approximately twice as expensive. Further, the levelized costs of generation vary much more across wind zones than those across solar zones because of greater heterogeneity in the quality of wind resources compared to that of solar resources. When considering transmission accessibility, we find that about half of all wind zones (47%) and two-thirds of all solar PV zones (66%) are more than 25 km from existing 220 kV and above substations, suggesting potential constraints in access to high voltage transmission infrastructure and opportunities for preemptive transmission planning to scale up RE development. Additionally and importantly, we find that about 84% of all wind zones are on agricultural land, which provide opportunities for multiple-uses of land but may also impose constraints on land availability. We find that only 29% of suitable solar PV sites and 15% of CSP sites are within 10 km of a surface water body suggesting water availability as a significant siting constraint for solar plants. Availability of groundwater resources was not analyzed as part of this study. Lastly, given the possible economic benefits of transmission extensions or upgrades that serve both wind and solar generators, we quantified the co-location opportunities between the two technologies and find that about a quarter (28%) of all solar PV zones overlap with wind zones. Using the planning tools made available as part of this study, these multiple siting constraints and opportunities can be systematically compared and weighted to prioritize development that achieves a particular technology target. Our results are limited by the uncertainties associated with the input datasets, in particular the geospatial wind and solar resource, transmission, and land use land cover datasets. As input datasets get updated and improved, the methodology and tools developed through this study can be easily adapted and applied to these new datasets to improve upon the results presented in this study. India is on a path to significantly decarbonize its electricity grid through wind and solar development. A stakeholder-driven, systematic, and integrated planning approach using data and tools such as those highlighted in this study is essential to not only meet the country's RE targets, but to meet them in a cost-effective, and socially and environmentally sustainable way.« less

  1. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    NASA Astrophysics Data System (ADS)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  2. Exploring spatial patterns of vulnerability for diverse biodiversity descriptors in regional conservation planning.

    PubMed

    Vimal, Ruppert; Pluvinet, Pascal; Sacca, Céline; Mazagol, Pierre-Olivier; Etlicher, Bernard; Thompson, John D

    2012-03-01

    In this study, we developed a multi-criteria assessment of spatial variability of the vulnerability of three different biodiversity descriptors: sites of high conservation interest by virtue of the presence of rare or remarkable species, extensive areas of high ecological integrity, and landscape diversity in grid cells across an entire region. We assessed vulnerability in relation to (a) direct threats in and around sites to a distance of 2 km associated with intensive agriculture, building and road infrastructure and (b) indirect effects of human population density on a wider scale (50 km). The different combinations of biodiversity and threat indicators allowed us to set differential priorities for biodiversity conservation and assess their spatial variation. For example, with this method we identified sites and grid cells which combined high biodiversity with either high threat values or low threat values for the three different biodiversity indicators. In these two classes the priorities for conservation planning will be different, reduce threat values in the former and restrain any increase in the latter. We also identified low priority sites (low biodiversity with either high or low threats). This procedure thus allows for the integration of a spatial ranking of vulnerability into priority setting for regional conservation planning. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  4. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  5. 43 CFR 3809.431 - When must I modify my plan of operations?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., including the following: (1) Development of acid or toxic drainage; (2) Loss of surface springs or water supplies; (3) The need for long-term water treatment and site maintenance; (4) Repair of reclamation...

  6. Resources | Energy Plan

    Science.gov Websites

    sequestration Strategy 7 Nuclear power Footer Text Department for Energy Development and Independence l 300 Sower Blvd. 3rd Floor l Frankfort, KY 40601 502-564-7192 (Telephone) l http://energy.ky.gov Site Map

  7. AmeriFlux Network Data Activities: updates, progress and plans

    NASA Astrophysics Data System (ADS)

    Yang, B.; Boden, T.; Krassovski, M.; Song, X.

    2013-12-01

    The Carbon Dioxide Information Analysis Center (CDIAC) at the Oak Ridge National Laboratory serves as the long-term data repository for the AmeriFlux network. Datasets currently available include hourly or half-hourly meteorological and flux observations, biological measurement records, and synthesis data products. In this presentation, we provide an update of this network database including a comprehensive review and evaluation of the biological data from about 70 sites, development of a new product for flux uncertainty estimates, and re-formatting of Level-2 standard files. In 2013, we also provided data support to two synthesis studies --- 2012 drought synthesis and FACE synthesis. Issues related to data quality and solutions in compiling datasets for these synthesis studies will be discussed. We will also present our work plans in developing and producing other high-level products, such as derivation of phenology from the available measurements at flux sites.

  8. 2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, Gregory

    2014-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less

  9. Planning and acquiring a national center for the United States Geological Survey

    USGS Publications Warehouse

    Schmidt, William A.

    1993-01-01

    This history of building a National Center for the U.S. Geological Survey is a "nuts and bolts" account of the planning, design and construction, forgotten happenings, and frustrations in the planning and authorization process, and the political and other considerations which played a significant role in the culmination of a dream about a National Center for the Geological Survey. This documented data of unique procedures in the acquisition and financing of Federal buildings, the choice and development of the building site, and its location as a contribution to the enhancement of the "new town" concept of the 1960's in the planning and development of the National Capital Area, may well provide guidance in the future to those who have to decide whether a building of true worth should be preserved.

  10. Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)

    NASA Technical Reports Server (NTRS)

    Niewoehner, Kevin R.; Carter, John (Technical Monitor)

    2001-01-01

    The research accomplishments for the cooperative agreement 'Online Learning Flight Control for Intelligent Flight Control Systems (IFCS)' include the following: (1) previous IFC program data collection and analysis; (2) IFC program support site (configured IFC systems support network, configured Tornado/VxWorks OS development system, made Configuration and Documentation Management Systems Internet accessible); (3) Airborne Research Test Systems (ARTS) II Hardware (developed hardware requirements specification, developing environmental testing requirements, hardware design, and hardware design development); (4) ARTS II software development laboratory unit (procurement of lab style hardware, configured lab style hardware, and designed interface module equivalent to ARTS II faceplate); (5) program support documentation (developed software development plan, configuration management plan, and software verification and validation plan); (6) LWR algorithm analysis (performed timing and profiling on algorithm); (7) pre-trained neural network analysis; (8) Dynamic Cell Structures (DCS) Neural Network Analysis (performing timing and profiling on algorithm); and (9) conducted technical interchange and quarterly meetings to define IFC research goals.

  11. 28. Site Plan: AF Station P67, Fort Custer, Michigan, Plot ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Site Plan: AF Station P-67, Fort Custer, Michigan, Plot Plan (to accompany FY 1956 project planning report), USACOE, 22 July 1954. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  12. Digital Database of Selected Aggregate and Related Resources in Ada, Boise, Canyon, Elmore, Gem, and Owyhee Counties, Southwestern Idaho

    USGS Publications Warehouse

    Moyle, Phillip R.; Wallis, John C.; Bliss, James D.; Bolm, Karen D.

    2004-01-01

    The U.S. Geological Survey (USGS) compiled a database of aggregate sites and geotechnical sample data for six counties - Ada, Boise, Canyon, Elmore, Gem, and Owyhee - in southwest Idaho as part of a series of studies in support of the Bureau of Land Management (BLM) planning process. Emphasis is placed on sand and gravel sites in deposits of the Boise River, Snake River, and other fluvial systems and in Neogene lacustrine deposits. Data were collected primarily from unpublished Idaho Transportation Department (ITD) records and BLM site descriptions, published Army Corps of Engineers (ACE) records, and USGS sampling data. The results of this study provides important information needed by land-use planners and resource managers, particularly in the BLM, to anticipate and plan for demand and development of sand and gravel and other mineral material resources on public lands in response to the urban growth in southwestern Idaho.

  13. Temporary disaster debris management site identification using binomial cluster analysis and GIS.

    PubMed

    Grzeda, Stanislaw; Mazzuchi, Thomas A; Sarkani, Shahram

    2014-04-01

    An essential component of disaster planning and preparation is the identification and selection of temporary disaster debris management sites (DMS). However, since DMS identification is a complex process involving numerous variable constraints, many regional, county and municipal jurisdictions initiate this process during the post-disaster response and recovery phases, typically a period of severely stressed resources. Hence, a pre-disaster approach in identifying the most likely sites based on the number of locational constraints would significantly contribute to disaster debris management planning. As disasters vary in their nature, location and extent, an effective approach must facilitate scalability, flexibility and adaptability to variable local requirements, while also being generalisable to other regions and geographical extents. This study demonstrates the use of binomial cluster analysis in potential DMS identification in a case study conducted in Hamilton County, Indiana. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  14. Analytic hierarchy process-based approach for selecting a Pareto-optimal solution of a multi-objective, multi-site supply-chain planning problem

    NASA Astrophysics Data System (ADS)

    Ayadi, Omar; Felfel, Houssem; Masmoudi, Faouzi

    2017-07-01

    The current manufacturing environment has changed from traditional single-plant to multi-site supply chain where multiple plants are serving customer demands. In this article, a tactical multi-objective, multi-period, multi-product, multi-site supply-chain planning problem is proposed. A corresponding optimization model aiming to simultaneously minimize the total cost, maximize product quality and maximize the customer satisfaction demand level is developed. The proposed solution approach yields to a front of Pareto-optimal solutions that represents the trade-offs among the different objectives. Subsequently, the analytic hierarchy process method is applied to select the best Pareto-optimal solution according to the preferences of the decision maker. The robustness of the solutions and the proposed approach are discussed based on a sensitivity analysis and an application to a real case from the textile and apparel industry.

  15. Statistical Algorithms Accounting for Background Density in the Detection of UXO Target Areas at DoD Munitions Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matzke, Brett D.; Wilson, John E.; Hathaway, J.

    2008-02-12

    Statistically defensible methods are presented for developing geophysical detector sampling plans and analyzing data for munitions response sites where unexploded ordnance (UXO) may exist. Detection methods for identifying areas of elevated anomaly density from background density are shown. Additionally, methods are described which aid in the choice of transect pattern and spacing to assure with degree of confidence that a target area (TA) of specific size, shape, and anomaly density will be identified using the detection methods. Methods for evaluating the sensitivity of designs to variation in certain parameters are also discussed. Methods presented have been incorporated into the Visualmore » Sample Plan (VSP) software (free at http://dqo.pnl.gov/vsp) and demonstrated at multiple sites in the United States. Application examples from actual transect designs and surveys from the previous two years are demonstrated.« less

  16. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  17. Planning a multi-site, complex intervention for homeless people with mental illness: the relationships between the national team and local sites in Canada's At Home/Chez Soi project.

    PubMed

    Nelson, Geoffrey; Macnaughton, Eric; Goering, Paula; Dudley, Michael; O'Campo, Patricia; Patterson, Michelle; Piat, Myra; Prévost, Natasha; Strehlau, Verena; Vallée, Catherine

    2013-06-01

    This research focused on the relationships between a national team and five project sites across Canada in planning a complex, community intervention for homeless people with mental illness called At Home/Chez Soi, which is based on the Housing First model. The research addressed two questions: (a) what are the challenges in planning? and (b) what factors that helped or hindered moving project planning forward? Using qualitative methods, 149 national, provincial, and local stakeholders participated in key informant or focus group interviews. We found that planning entails not only intervention and research tasks, but also relational processes that occur within an ecology of time, local context, and values. More specifically, the relationships between the national team and the project sites can be conceptualized as a collaborative process in which national and local partners bring different agendas to the planning process and must therefore listen to, negotiate, discuss, and compromise with one another. A collaborative process that involves power-sharing and having project coordinators at each site helped to bridge the differences between these two stakeholder groups, to find common ground, and to accomplish planning tasks within a compressed time frame. While local context and culture pushed towards unique adaptations of Housing First, the principles of the Housing First model provided a foundation for a common approach across sites and interventions. The implications of the findings for future planning and research of multi-site, complex, community interventions are noted.

  18. Site alteration effects from rocket exhaust impingment during a simulated Viking Mars landing. Part 1: Nozzle development and physical site alternation

    NASA Technical Reports Server (NTRS)

    Romine, G. L.; Reisert, T. D.; Gliozzi, J.

    1973-01-01

    A potential interference problem for the Viking '75 scientific investigation of the Martian surface resulting from retrorocket exhaust plume impingement of the surface was investigated experimentally and analytically. It was discovered that the conventional bell nozzle originally planned for the Viking Lander retrorockets would produce an unacceptably large amount of physical disturbance to the landing site. An experimental program was subsequently undertaken to find and/or develop a nozzle configuration which would significantly reduce the site alteration. A multiple nozzle configuration, consisting of 18 small bell nozzles, was shown to produce a level of disturbance that was considered by the Viking Lander Science Teams to be acceptable on the basis of results from full-scale tests on simulated Martian soils.

  19. SU-G-TeP1-05: Development and Clinical Introduction of Automated Radiotherapy Treatment Planning for Prostate Cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Winkel, D; Bol, GH; Asselen, B van

    Purpose: To develop an automated radiotherapy treatment planning and optimization workflow for prostate cancer in order to generate clinical treatment plans. Methods: A fully automated radiotherapy treatment planning and optimization workflow was developed based on the treatment planning system Monaco (Elekta AB, Stockholm, Sweden). To evaluate our method, a retrospective planning study (n=100) was performed on patients treated for prostate cancer with 5 field intensity modulated radiotherapy, receiving a dose of 35×2Gy to the prostate and vesicles and a simultaneous integrated boost of 35×0.2Gy to the prostate only. A comparison was made between the dosimetric values of the automatically andmore » manually generated plans. Operator time to generate a plan and plan efficiency was measured. Results: A comparison of the dosimetric values show that automatically generated plans yield more beneficial dosimetric values. In automatic plans reductions of 43% in the V72Gy of the rectum and 13% in the V72Gy of the bladder are observed when compared to the manually generated plans. Smaller variance in dosimetric values is seen, i.e. the intra- and interplanner variability is decreased. For 97% of the automatically generated plans and 86% of the clinical plans all criteria for target coverage and organs at risk constraints are met. The amount of plan segments and monitor units is reduced by 13% and 9% respectively. Automated planning requires less than one minute of operator time compared to over an hour for manual planning. Conclusion: The automatically generated plans are highly suitable for clinical use. The plans have less variance and a large gain in time efficiency has been achieved. Currently, a pilot study is performed, comparing the preference of the clinician and clinical physicist for the automatic versus manual plan. Future work will include expanding our automated treatment planning method to other tumor sites and develop other automated radiotherapy workflows.« less

  20. Sustainable Development Strategy Of Domestic Waste Infrastructure In The City Of Surakarta

    NASA Astrophysics Data System (ADS)

    Rezagama, Arya; Purwono; Damayanti, Verika

    2018-02-01

    Shifting from traditional system to large, centralised infrastructure domestic waste is widely complex challenge. Most of fhe sanitary system on household in Surakarta use on site septictank, 17% sewerage system reached and16,0% stll open defecations. Sanitation development sustained aims to develop policy and strategies waste management domestic Surakarta in the long term (20 years). The projection use quantitative method and institutional condition approach by SWOT analysis. Surakarta City get priority sanitation urban planning from Indonesian government in Presiden Joko Widodo era. The domestic waste management systems that is Surakarta divided into system on-site and system off site. Waste Water Treatment Plant (WWTP) mojosongo, WWTP pucangsawit and WWTP Semanggi will be developed to treat 30% domestic waste of Surakarta Residence. While on-site system will are served 70% residence by service programs Regular Cleaning Septictank. The toughest challenge is how to increase community participation in waste management and improve the company"s financial condition. Sanitation sustainable development is going to happen if supported by facility development also good, institutional development, the arrangement that oversees, and the public participation.

  1. SUPERFUND TREATABILITY CLEARINGHOUSE: SOIL STABILIZATION PILOT STUDY, UNITED CHROME NPL SITE PILOT STUDY AND HEALTH AND SAFETY PROGRAM, UNITED CHROME NPL SITE PILOT STUDY

    EPA Science Inventory

    This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...

  2. 77 FR 51021 - Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources, Research and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ..., Research and Development Program 2012 Annual Plan AGENCY: Office of Fossil Energy, Department of Energy. ACTION: Notice of report availability. SUMMARY: The Office of Fossil Energy announces the availability of... Resources Research and Development Program on the DOE Web site at www.fossil.energy.gov/programs/oilgas...

  3. 76 FR 56412 - Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... Research and Development Program 2011 Annual Plan AGENCY: Office of Fossil Energy, Department of Energy. ACTION: Notice of report availability. SUMMARY: The Office of Fossil Energy announces the availability of... Resources Research and Development Program on the DOE Web site at http://www.fossil.energy.gov/programs...

  4. DEVELOPMENT OF COMMUNITY POWER FROM SUSTAINABLE SMALL HYDRO POWER SYSTEMS – A CAPACITY BUILDING PROJECT IN BANGANG, CAMEROON

    EPA Science Inventory

    The hydro-turbine developed in Phase I will be fabricated on-site in Bangang, Cameroon using locally sourced materials. Data of the performance tests will be collected and analyzed using appropriate engineering analysis tools. A second trip will be planned for extensive testin...

  5. Quality-assurance plan for groundwater activities, U.S. Geological Survey, Washington Water Science Center

    USGS Publications Warehouse

    Kozar, Mark D.; Kahle, Sue C.

    2013-01-01

    This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.

  6. Interactive Marine Spatial Planning: Siting Tidal Energy Arrays around the Mull of Kintyre

    PubMed Central

    Alexander, Karen A.; Janssen, Ron; Arciniegas, Gustavo; O'Higgins, Timothy G.; Eikelboom, Tessa; Wilding, Thomas A.

    2012-01-01

    The rapid development of the offshore renewable energy sector has led to an increased requirement for Marine Spatial Planning (MSP) and, increasingly, this is carried out in the context of the ‘ecosystem approach’ (EA) to management. We demonstrate a novel method to facilitate implementation of the EA. Using a real-time interactive mapping device (touch-table) and stakeholder workshops we gathered data and facilitated negotiation of spatial trade-offs at a potential site for tidal renewable energy off the Mull of Kintyre (Scotland). Conflicts between the interests of tidal energy developers and commercial and recreational users of the area were identified, and use preferences and concerns of stakeholders were highlighted. Social, cultural and spatial issues associated with conversion of common pool to private resource were also revealed. The method identified important gaps in existing spatial data and helped to fill these through interactive user inputs. The workshops developed a degree of consensus between conflicting users on the best areas for potential development suggesting that this approach should be adopted during MSP. PMID:22253865

  7. 21 CFR 822.35 - Can you inspect my manufacturing site or other sites involved in my postmarket surveillance plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Can you inspect my manufacturing site or other sites involved in my postmarket surveillance plan? 822.35 Section 822.35 Food and Drugs FOOD AND DRUG... Records and Reports § 822.35 Can you inspect my manufacturing site or other sites involved in my...

  8. TEMA-DOE annual report, July 1, 1997--June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-09-01

    The Tennessee Emergency Management Agency (TEMA) will develop off-site Multi-Jurisdictional Emergency Response Plans (MJERPs) in coordination with Federal, State, and local agencies. The MJERPs will describe actions to minimize the risks to the citizens of Tennessee as a result of an off-site release of hazardous material from the DOE Oak Ridge Reservation. This report describes actions made during each quarter of the year.

  9. Exploring the Links between Post-Industrial Landscape History and Ecology through Participatory Methods

    PubMed Central

    2015-01-01

    There is increasing recognition of the importance for local biodiversity of post-mining sites, many of which lie near communities that have suffered significant social and economic deprivation as the result of mine closures. However, no studies to date have actively used the knowledge of local communities to relate the history and treatment of post-mining sites to their current ecological status. We report a study of two post-mining sites in the Yorkshire coalfield of the UK in which the local community were involved in developing site histories and assessing plant and invertebrate species composition. Site histories developed using participatory GIS revealed that the sites had a mixture of areas of spontaneous succession and technical reclamation, and identified that both planned management interventions and informal activities influenced habitat heterogeneity and ecological diversity. Two groups of informal activity were identified as being of particular importance. Firstly, there has been active protection by the community of flower-rich habitats of conservation value (e.g. calcareous grassland) and distinctive plant species (e.g. orchids) which has also provided important foraging resources for butterfly and bumblebee species. Secondly, disturbance by activities such as use of motorbikes, informal camping, and cutting of trees and shrubs for fuel, as well as planned management interventions such as spreading of brick rubble, has provided habitat for plant species of open waste ground and locally uncommon invertebrate species which require patches of bare ground. This study demonstrates the importance of informal, and often unrecorded, activities by the local community in providing diverse habitats and increased biodiversity within a post-mining site, and shows that active engagement with the local community and use of local knowledge can enhance ecological interpretation of such sites and provide a stronger basis for successful future management. PMID:26309041

  10. Exploring the Links between Post-Industrial Landscape History and Ecology through Participatory Methods.

    PubMed

    Rich, Kevin J; Ridealgh, Michael; West, Sarah E; Cinderby, Steve; Ashmore, Mike

    2015-01-01

    There is increasing recognition of the importance for local biodiversity of post-mining sites, many of which lie near communities that have suffered significant social and economic deprivation as the result of mine closures. However, no studies to date have actively used the knowledge of local communities to relate the history and treatment of post-mining sites to their current ecological status. We report a study of two post-mining sites in the Yorkshire coalfield of the UK in which the local community were involved in developing site histories and assessing plant and invertebrate species composition. Site histories developed using participatory GIS revealed that the sites had a mixture of areas of spontaneous succession and technical reclamation, and identified that both planned management interventions and informal activities influenced habitat heterogeneity and ecological diversity. Two groups of informal activity were identified as being of particular importance. Firstly, there has been active protection by the community of flower-rich habitats of conservation value (e.g. calcareous grassland) and distinctive plant species (e.g. orchids) which has also provided important foraging resources for butterfly and bumblebee species. Secondly, disturbance by activities such as use of motorbikes, informal camping, and cutting of trees and shrubs for fuel, as well as planned management interventions such as spreading of brick rubble, has provided habitat for plant species of open waste ground and locally uncommon invertebrate species which require patches of bare ground. This study demonstrates the importance of informal, and often unrecorded, activities by the local community in providing diverse habitats and increased biodiversity within a post-mining site, and shows that active engagement with the local community and use of local knowledge can enhance ecological interpretation of such sites and provide a stronger basis for successful future management.

  11. Review of potential EGS sites and possible EGS demonstration scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1999-09-01

    Review of potential sites for Enhanced Geothermal Systems (EGS) and development of reference scenarios for EGS demonstration projects are two sub-tasks included in the FY 1999 EGS Research and Development (R&D) Management Task (DOE Task Order Number DE-AT07-99ID60365, included in the Appendix of this report). These sub-tasks are consistent with the EGS Strategic Plan, which includes milestones relating to EGS site selection (Milestone 4, to be completed in 2004) and development of a cost-shared, pilot-scale demonstration project (Milestone 5, to be completed in 2008). The purpose of the present work is to provide some reference points for discussing what typemore » of EGS projects might be undertaken, where they might be located, and what the associated benefits are likely to be. The review of potential EGS sites is presented in Chapter 2 of this report. It draws upon site-selection criteria (and potential project sites that were identified using those criteria) developed at a mini-workshop held at the April 1998 DOE Geothermal Program Review to discuss EGS R&D issues. The criteria and the sites were the focus of a paper presented at the 4th International Hot Dry Rock Forum in Strasbourg in September 1998 (Sass and Robertson-Tait, 1998). The selection criteria, project sites and possible EGS developments discussed in the workshop and paper are described in more detail herein. Input from geothermal operators is incorporated, and water availability and transmission-line access are emphasized. The reference scenarios for EGS demonstration projects are presented in Chapter 3. Three alternative scenarios are discussed: (1) a stand-alone demonstration plant in an area with no existing geothermal development; (2) a separate generating facility adjacent to an existing geothermal development; and (3) an EGS project that supplies an existing geothermal power plant with additional generating capacity. Furthermore, information potentially useful to DOE in framing solicitations and selecting projects for funding is discussed objectively. Although defined as separate sub-tasks, the EGS site review and reference scenarios are closely related. The incremental approach to EGS development that has recently been adopted could logically be expected to yield proposals for studies that lead up to and include production-enhancement experiments in producing geothermal fields in the very near future. However, the strategic plan clearly calls for the development of a more comprehensive demonstration project that can generate up to perhaps 10 MW (gross). It is anticipated that a series of small-scale experiments will define what realistically may be achieved in the near future, thus setting the stage for a successful pilot demonstration. This report continues the process of presenting information on EGS sites and experiments, and begins the process of defining what a demonstration project might be.« less

  12. 24 CFR 51.102 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... areas and advise local officials, developers, and planning groups of the unacceptability of sites... the suitability of the acoustical environment of proposed projects; (2) Notify applicants of any... acceptability standards in commenting on the prospective impacts of transportation facilities and other noise...

  13. 24 CFR 51.102 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... areas and advise local officials, developers, and planning groups of the unacceptability of sites... the suitability of the acoustical environment of proposed projects; (2) Notify applicants of any... acceptability standards in commenting on the prospective impacts of transportation facilities and other noise...

  14. The Role of Publicly Funded Family Planning Sites In Health Insurance Enrollment.

    PubMed

    Yarger, Jennifer; Daniel, Sara; Biggs, M Antonia; Malvin, Jan; Brindis, Claire D

    2017-06-01

    Publicly funded family planning providers are well positioned to help uninsured individuals learn about health insurance coverage options and effectively navigate the enrollment process. Understanding how these providers are engaged in enrollment assistance and the challenges they face in providing assistance is important for maximizing their role in health insurance outreach and enrollment. In 2014, some 684 sites participating in California's family planning program were surveyed about their involvement in helping clients enroll in health insurance. Weighted univariate and bivariate analyses were conducted to examine enrollment activities and perceived barriers to facilitating enrollment by site characteristics. Most family planning program sites provided eligibility screening (68%), enrollment education (77%), on-site enrollment assistance (55%) and referrals for off-site enrollment support (91%). The proportion of sites offering each type of assistance was highest among community clinics (83-96%), primary care and multispecialty sites (65-95%), Title X-funded sites (72-98%), sites with contracts to provide primary care services (64-93%) and sites using only electronic health records (66-94%). Commonly identified barriers to providing assistance were lack of staff time (reported by 52% of sites), lack of funding (47%), lack of physical space (34%) and lack of staff knowledge (33%); only 20% of sites received funding to support enrollment activities. Although there were significant variations among them, publicly funded family planning providers in California are actively engaged in health insurance enrollment. Supporting their vital role in enrollment could help in the achievement of universal health insurance coverage. Copyright © 2017 by the Guttmacher Institute.

  15. Planning for solar access

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heckeroth, S.; McLees, C.

    1997-12-31

    Land use planning is often no more than a strategy for getting the most economic value from a given piece of land while attempting to minimize the expense of mitigating environmental impacts. Because conventional fuels are currently inexpensive, development takes place with little consideration for energy efficiency or solar access. By identifying sites with solar access now, planners and building designers can assure that the south facing roofs and walls of future buildings will receive the solar energy necessary to satisfy the energy needs of their occupants. Planner Ian McHarg outlined scientific methods to map natural determinants including geology, hydrology,more » wildlife, soils, climate, as well as social determinants like population density, energy consumption, and transportation patterns in the late 60s. Overlays of these hand plotted maps gave planners a method of finding the most suitable sites for identified needs but were cost prohibitive for most projects. The affordability of studies done on high speed computers now allows general application of McHargian planning methods. At the time McHarg was developing his planning theory photovoltaics were so expensive their use was restricted to government projects. The low cost of heating with fossil fuels made solar heating expensive by comparison. Today advances in solar technology have made solar electricity and heating competitive with non-renewable energy resources. This paper will show how McHargian planning methods can be effectively used in conjunction with Geographic Information Systems (GIS) to include efficiency and renewable energy access in land use decision making.« less

  16. Ecocity mapping using GIS: introducing a planning method for assessing and improving neighborhood vitality.

    PubMed

    Smith, Richard; Miller, Kirstin

    2013-01-01

    Assessing neighborhood vitality is important to understanding how to improve quality of life and health outcomes. The ecocity model recognizes that cities are part of natural systems and favors walkable neighborhoods. This article introduces ecocity mapping, an innovative planning method, to the public health literature on community engagement by describing a pilot project with a new affordable housing development in Oakland, California between 2007 and 2009. Although ecocity mapping began as a paper technology, advances in geographic information systems (GIS) moved it forward. This article describes how Ecocity Builders used GIS to conduct ecocity mapping to (1) assess vitality of neighborhoods and urban centers to prioritize community health intervention pilot sites and (2) create scenario maps for use in community health planning. From fall 2007 to summer 2008, Ecocity Builders assessed neighborhood vitality using walking distance from parks, schools, rapid transit stops, grocery stores, and retail outlets. In 2008, ecocity maps were shared with residents to create a neighborhood health and sustainability plan. In 2009, Ecocity Builders developed scenario maps to show how changes to the built environment would improve air quality by reducing greenhouse gas emissions from vehicles, while increasing access to basic services and natural amenities. Community organizing with GIS was more useful than GIS alone for final site selection. GIS was useful in mapping scenarios after residents shared local neighborhood knowledge and ideas for change. Residents were interested in long-term environmental planning, provided they could meet immediate needs.

  17. Integrating expert knowledge in a GIS to optimize siting decisions for small-scale healthy food retail interventions.

    PubMed

    Sadler, Richard Casey

    2016-06-16

    The availability of healthy foods in a neighborhood remains a key determinant of diet and diet-related disease in disadvantaged communities. Innovative solutions to the 'food desert' problem include the deployment of mobile markets and healthy corner store initiatives. Such initiatives, however, do not always capitalize on the principles guiding retail development and the possibilities of GIS-based data. Simultaneously, community partners are not always engaged effectively in the planning for such interventions, which limits acceptability and suitability of such work. This paper highlights the results of a participatory mapping exercise to optimize the siting of a planned healthy food retail intervention in Flint, Michigan. Potential sites are chosen by engaging experts in a three-stage mapping process that includes the analytic hierarchy process and point allocation of five key variables (including food access, socioeconomic distress, population density, access to transit, and proximity to neighborhood centers), as well as direct mapping of suitable sites. Results suggest a discrete set of areas-primarily in the northwestern quadrant of the city-where small-scale healthy food retail interventions might be most strategically located. Areas with the most consistent overlap between directly mapped sites and very high levels of suitability align well with neighborhoods which are distant from existing grocery stores. As a community-based strategy, this increases the opportunity for effectively improving neighborhood access to healthy foods by optimizing the potential sites for healthy food interventions. Community partners have already been active in using these results in project planning for just such an intervention.

  18. Environmental impact reduction through ecological planning at Bahia Magdalena, Mexico.

    PubMed

    Malagrino, Giovanni; Lagunas, Magdalena; Rubio, Alfredo Ortega

    2008-03-01

    For analyzing basic marine and coastal characteristics we selected the potential sites where shrimp culture could be developed in a large coastal zone, Bahia Magdalena, Baja California Sur, Mexico. Based on our analysis, 6 sites were preselected and field stages of work were then developed to assess the precise suitability of each site in order to develop the proposed aquaculture activities. In ranking the suitability we were able to recommend the most appropriate places to develop shrimp culture in this region. Also, knowing the exact biological, physico-chemical and social environment, we determined the best species to cultivate, the recommended total area and the methodology to be used to lessen the environmental impact and to obtain the maximum profitability Our methodology could be used not only to select appropriate sites for shrimp culture in other coastal lagoons, but it also could be applied to assess the suitability in a quick and accurate way, of any other production activity in coastal zones.

  19. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are beingmore » made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.« less

  20. Geological Investigation Program for the Site of a New Nuclear Power Plant in Hungary

    NASA Astrophysics Data System (ADS)

    Gerstenkorn, András; Trosits, Dalma; Chikán, Géza; János Katona, Tamás

    2015-04-01

    Comprehensive site evalaution program is implemented for the new Nuclear Power Plant to be constructed at Paks site in Hungary with the aim of confirmation of acceptability of the site and definition of site-related design basis data. Most extensive part of this program is to investigate geological-tectonical features of the site with particular aim on the assessment of the capability of faults at and around the site, characterization of site seismic hazard, and definition of the design basis earthquake. A brief description of the scope and methodology of the geological, seismological, geophysical, geotechnical and hydrogeological investigations will be given on the poster. Main focus of the presentation is to show the graded structure and extent of the geological investigations that follow the needs and scale of the geological modeling, starting with the site and its vicinity, as well as on the near regional and the regional scale. Geological inverstigations includes several boreholes up-to the base-rock, plenty of boreholes discovering the Pannonian and large number of shallow boreholes for investigation of more recent development. The planning of the geological investigations is based on the 3D seismic survey performed around the site, that is complemented by shallow-seimic survey at and in the vicinity of the site. The 3D geophysical imaging provides essential geodynamic information to assess the capability of near site faults and for the seismic hazard analysis, as well as for the hydrogeological modeling. The planned seismic survey gives a unique dataset for understanding the spatial relationship between individual fault segments. Planning of the research (trenching, etc.) for paleoseismic manifestations is also based on the 3D seismic survey. The seismic survey and other geophysical data (including data of space geodesy) allow the amendment of the understanding and the model of the tectonic evolution of the area and geological events. As it is known from earlier studies, seismic sources in the near regional area are the dominating contributors to the site seimic hazard. Therefore a 3D geological model will be developed for the 50 km region around the site in order to consider different geological scenarios. Site-scale investigations are aimed on the characterization of local geotechnical and hydrogeological conditions. The geotechnical investigations provide data for the evaluation of site response, i.e. the free-field ground motion response spectra, assessment of the liquefaction hazard and foundation design. Important element of the hydrogeological survey is numerical groundwater modeling. The aim of hydrogeological modeling is the summary of hydrogeological data in a numeric system, the description, simulation of underground water flow and transport conditions.

  1. 17. Photographic copy of intial site plan for North Base: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of intial site plan for North Base: AF Job No. 1045, Military Construction: Muroc Bombing Range, Muroc Lake, California; Materiel Test Site: Location Plan, Sheet No. 1 of 11, May 1942. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  2. Mineralogic Model (MM3.0) Analysis Model Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. Lum

    2002-02-12

    The purpose of this report is to document the Mineralogic Model (MM), Version 3.0 (MM3.0) with regard to data input, modeling methods, assumptions, uncertainties, limitations and validation of the model results, qualification status of the model, and the differences between Version 3.0 and previous versions. A three-dimensional (3-D) Mineralogic Model was developed for Yucca Mountain to support the analyses of hydrologic properties, radionuclide transport, mineral health hazards, repository performance, and repository design. Version 3.0 of the MM was developed from mineralogic data obtained from borehole samples. It consists of matrix mineral abundances as a function of x (easting), y (northing),more » and z (elevation), referenced to the stratigraphic framework defined in Version 3.1 of the Geologic Framework Model (GFM). The MM was developed specifically for incorporation into the 3-D Integrated Site Model (ISM). The MM enables project personnel to obtain calculated mineral abundances at any position, within any region, or within any stratigraphic unit in the model area. The significance of the MM for key aspects of site characterization and performance assessment is explained in the following subsections. This work was conducted in accordance with the Development Plan for the MM (CRWMS M&O 2000). The planning document for this Rev. 00, ICN 02 of this AMR is Technical Work Plan, TWP-NBS-GS-000003, Technical Work Plan for the Integrated Site Model, Process Model Report, Revision 01 (CRWMS M&O 2000). The purpose of this ICN is to record changes in the classification of input status by the resolution of the use of TBV software and data in this report. Constraints and limitations of the MM are discussed in the appropriate sections that follow. The MM is one component of the ISM, which has been developed to provide a consistent volumetric portrayal of the rock layers, rock properties, and mineralogy of the Yucca Mountain site. The ISM consists of three components: (1) Geologic Framework Model (GFM); (2) Rock Properties Model (RPM); and (3) Mineralogic Model (MM). The ISM merges the detailed stratigraphy and structural features of the site into a 3-D model that will be useful in primary downstream models and repository design. These downstream models include the hydrologic flow models and the radionuclide transport models. All the models and the repository design, in turn, will be incorporated into the Total System Performance Assessment (TSPA) of the potential nuclear waste repository block and vicinity to determine the suitability of Yucca Mountain as a host for a repository. The interrelationship of the three components of the ISM and their interface with downstream uses are illustrated in Figure 1. The lateral boundaries of the ISM and its three component models are shown in Figure 2.« less

  3. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  4. Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.; Mertesdorf, E.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less

  5. Site 300 SPCC Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less

  6. Second cancer risk assessments after involved-site radiotherapy for mediastinal Hodgkin lymphoma.

    PubMed

    Mazonakis, Michalis; Lyraraki, Efrossyni; Damilakis, John

    2017-07-01

    This study was conducted to provide second cancer risk assessments attributable to involved-site radiotherapy (ISRT) of mediastinal Hodgkin lymphoma (HL) and to compare these risks with those from the conventional involved-field radiation therapy (IFRT). Both ISRT and IFRT plans were made for 11 patients (six females, five males) with HL in the region of mediastinum. All three-dimensional plans involved 6 MV photon beams and delivered 30 Gy to the target site. Differential dose-volume histograms were defined for the lung, female breast, and esophagus which were partly included within the planned treatment fields. The patient-specific organ equivalent dose (OED) and the relevant lifetime attributable risk (LAR) of developing malignancies in each of the above critical organs were determined with the aid of a mechanistic, plateau and bell-shaped models. The LAR estimates were compared with the baseline risks for unexposed people. The OED range of lung, breast, and esophagus calculated by the ISRT plans was 176.1-360.2, 19.5-124.1, and 42.6-157.7 cGy, respectively. The resultant LARs of developing lung and breast cancer as estimated by the three different models were at least 1.8 and 5.3 times lower than the baseline risks, respectively. The probability for the appearance of radiation-induced esophageal malignancies from ISRT in males was also up to 3.8 times smaller than the nominal incidence cancer rates. The corresponding probability in irradiated females exceeded the baseline risks. The estimated lifetime risks for lung and breast cancer induction due to ISRT were systematically and significantly lower than those from the IFRT irrespective of the model used for analysis (P < 0.05). No significant difference was found between the LARs for esophageal cancer development estimated by the ISRT and IFRT plans (P = 0.63). The presented second cancer risk data may be of value in the selection of the optimal radiotherapy technique for the management of mediastinal HL and in the subsequent follow-up of irradiated patients. © 2017 American Association of Physicists in Medicine.

  7. A Global Survey and Interactive Map Suite of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges: (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D)

    NASA Astrophysics Data System (ADS)

    Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.

    2017-12-01

    This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.

  8. Feasibility study for locating archaeological village sites by satellite remote sensing techniques. [multispectral photography of Alaska

    NASA Technical Reports Server (NTRS)

    Cook, J. P. (Principal Investigator); Stringer, W. J.

    1974-01-01

    The author has identified the following significant results. The objective is to determine the feasibility of detecting large Alaskan archaeological sites by satellite remote sensing techniques and mapping such sites. The approach used is to develop digital multispectral signatures of dominant surface features including vegetation, exposed soils and rock, hydrological patterns and known archaeological sites. ERTS-1 scenes are then printed out digitally in a map-like array with a letter reflecting the most appropriate classification representing each pixel. Preliminary signatures were developed and tested. It was determined that there was a need to tighten up the archaeological site signature by developing accurate signatures for all naturally-occurring vegetation and surface conditions in the vicinity of the test area. These second generation signatures have been tested by means of computer printouts and classified tape displays on the University of Alaska CDU-200 and by comparison with aerial photography. It has been concluded that the archaeological signatures now in use are as good as can be developed. Plans are to print out signatures for the entire test area and locate on topographic maps the likely locations of archaeological sites within the test area.

  9. Continued development of hybrid directional boring technology and New horizontal logging development for characterization, monitoring and instrument emplacement at environmental sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wemple, R.P.; Meyer, R.D.; Jacobson, R.D.

    This work in partnership with industry is a continuation of cost- effective innovative, directional boring development begun in FY90 and planed to extend into FY94. Several demonstrations of the strategy of building hybrid hardware from utilities installation, geothermal, and soil mechanics technologies have been performed at Sandia National Laboratories (SNL) and at Charles Machine works (CMW) test sites as well as at a commercial refinery site. Additional tests at the SNL Directional Boring Test Range (DBTR) and a lagoon site are planned in calendar 1991. A new companion project to develop and demonstrate a hybrid capability for horizontal logging withmore » penetrometers, specialty instruments and samplers has been taken from concept to early prototype hardware. The project goal of extending the tracking/locating capability of the shallow boring equipment to 80in. is being pursued with encouraging results at 40in. depths. Boring costs, not including tailored well completions dictated by individual site parameters, are estimated at $20 to $50 per foot. Applications continue to emerge for this work and interest continues to be expressed by DoD and EPA researchers and environmental site engineers. 12 figs.« less

  10. TU-FG-201-03: Automatic Pre-Delivery Verification Using Statistical Analysis of Consistencies in Treatment Plan Parameters by the Treatment Site and Modality

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, S; Wu, Y; Chang, X

    Purpose: A novel computer software system, namely APDV (Automatic Pre-Delivery Verification), has been developed for verifying patient treatment plan parameters right prior to treatment deliveries in order to automatically detect and prevent catastrophic errors. Methods: APDV is designed to continuously monitor new DICOM plan files on the TMS computer at the treatment console. When new plans to be delivered are detected, APDV checks the consistencies of plan parameters and high-level plan statistics using underlying rules and statistical properties based on given treatment site, technique and modality. These rules were quantitatively derived by retrospectively analyzing all the EBRT treatment plans ofmore » the past 8 years at authors’ institution. Therapists and physicists will be notified with a warning message displayed on the TMS computer if any critical errors are detected, and check results, confirmation, together with dismissal actions will be saved into database for further review. Results: APDV was implemented as a stand-alone program using C# to ensure required real time performance. Mean values and standard deviations were quantitatively derived for various plan parameters including MLC usage, MU/cGy radio, beam SSD, beam weighting, and the beam gantry angles (only for lateral targets) per treatment site, technique and modality. 2D-based rules of combined MU/cGy ratio and averaged SSD values were also derived using joint probabilities of confidence error ellipses. The statistics of these major treatment plan parameters quantitatively evaluate the consistency of any treatment plans which facilitates automatic APDV checking procedures. Conclusion: APDV could be useful in detecting and preventing catastrophic errors immediately before treatment deliveries. Future plan including automatic patient identify and patient setup checks after patient daily images are acquired by the machine and become available on the TMS computer. This project is supported by the Agency for Healthcare Research and Quality (AHRQ) under award 1R01HS0222888. The senior author received research grants from ViewRay Inc. and Varian Medical System.« less

  11. Potentials of marginal lands - sponateous ecosystem development

    NASA Astrophysics Data System (ADS)

    Gerwin, Werner; Schaaf, Wolfgang

    2017-04-01

    Marginal lands are often considered as unfertile and not productive. They are widely excluded from modern land use by conventional agriculture. Assessment of soil fertility usually shows very low productivity potentials at least for growing traditional crops. However, it can be frequently observed that natural succession at different types of marginal lands leads to very diverse and nonetheless productive ecosystems. Examples can be found at abandoned former industrial or transportation sites which were set aside and not further maintained - and also in post-mining landscapes. In one of the lignite open cast mines of the State of Brandenburg in Eastern Germany a landscape observatory was established in 2005 for observing this natural ecosystem development under marginal site conditions. The site of 6 ha is part of the post-mining landscapes of Lusatia which are often characterized by poor soil conditions and clearly reduced soil fertility. It is named "Hühnerwasser-Quellgebiet" (Chicken Creek Catchment) after a small stream that is restored again after destruction by the mining operations. It is planned to serve as the headwater of this stream and was left to an unrestricted primary succession. A comprehensive scientific monitoring program is carried out since the start of ecosystem development in 2005. The results offer exemplary insights into the establishment of interaction networks between the developing ecosystem compartments. After 10 years a large biodiversity, expressed by a high number of species, can be found at this site as the result of natural recovery processes. A large number of both tree species and individuals have settled here. Even if no economic use of the site and of the woody biomass produced by these trees is planned, an overall assessment of the biomass production was carried out. The results showed that the biomass production from natural succession without any application of fertilizers etc. is directly comparable with yields from adjacent post-mining sites where trees are grown in agroforestry systems for bioenergy production. This reflects the general potentials of marginal lands with regard to biomass production.

  12. Frederick Law Olmsted National Historic Site : transportation study

    DOT National Transportation Integrated Search

    2011-02-01

    This study provide concepts and ideas for a complementary transportation plan in support of the revised General Management Plan (GMP) for the Frederick Law Olmsted National Historic Site. The GMP sets forth a preferred plan of action for how Olmsted ...

  13. Current Status and Future Plans of the NEON Airborne Observation Platform (AOP): Data Products, Observatory Requirements and Opportunities for the Community

    NASA Astrophysics Data System (ADS)

    Petroy, S. B.; Leisso, N.; Goulden, T.; Gulbransen, T.

    2016-12-01

    The National Ecological Observatory Network (NEON) is a continental-scale ecological observation platform designed to collect and disseminate data that contributes to understanding and forecasting the impacts of climate change, land use change, and invasive species on ecology. NEON will collect in-situ and airborne data over 81 sites across the US, including Alaska, Hawaii, and Puerto Rico. The Airborne Observation Platform (AOP) group within the NEON project operates a payload suite that includes a waveform LiDAR, imaging spectrometer (NIS) and high resolution RGB camera. Data from this sensor suite will be collected annually over each site and processed into a set of standard data products, generally following the processing levels used by NASA (Level 1 through Level 3). We will present a summary of the first operational flight campaign (2016), where AOP flew 42 of the 81 planned NEON sites, our operational plans for 2017, and how we will ramp up to full operations by 2018. We will also describe the final set of AOP data products to be delivered as part of NEON construction and those field (observational) data products collected concurrently on the ground, that may be used to support validation efforts of algorithms for deriving vegetation characteristics from airborne data (e.g. Plant foliar physical/chemical properties, Digital Hemispherical Photos, Plant Diversity, etc.). Opportunities for future enhancements to data products or algorithms will be facilitated via NEON's cyberinfrastructure, which is designed to support wrapping/integration of externally-developed code. And finally, we will present NEON's plans for the third AOP Sensor Suite as an assignable asset and the intent of NSF to provide research opportunities to the community for developing higher level AOP data products that were removed from the NEON project in 2015.

  14. Application of earth resources technology satellite data to urban and regional planning: Test site, County of Los Angeles

    NASA Technical Reports Server (NTRS)

    Raje, S.; Mcknight, J.; Willoughby, G.; Economy, R. (Principal Investigator)

    1974-01-01

    The author has identified the following significant results. The County of Los Angeles photointerpreted ERTS film products to define problems of interest, coordinated ground truth over the complex test site including interfaces with secondary users as well as participated in on-line analyses of the GE multispectral information extraction systems. Interactive machine analyses were carried out, developing techniques and procedures as well as evaluating the outputs for community and regional planning. Extensive aircraft underflight coverage was provided that was valuable both in inputs preparation and outputs evaluation of the machine-aided analyses. One of the nonstandard ERTS images led to the discovery of a major new fault lineament on the northern slope of the Santa Monica Mountains.

  15. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility wasmore » needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)« less

  16. Newberry Volcano EGS Demonstration - Phase I Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osborn, William L.; Petty, Susan; Cladouhos, Trenton T.

    Phase I of the Newberry Volcano Enhanced Geothermal System (EGS) Demonstration included permitting, community outreach, seismic hazards analysis, initial microseismic array deployment and calibration, final MSA design, site characterization, and stimulation planning. The multi-disciplinary Phase I site characterization supports stimulation planning and regulatory permitting, as well as addressing public concerns including water usage and induced seismicity. A review of the project's water usage plan by an independent hydrology consultant found no expected impacts to local stakeholders, and recommended additional monitoring procedures. The IEA Protocol for Induced Seismicity Associated with Enhanced Geothermal Systems was applied to assess site conditions, properly informmore » stakeholders, and develop a comprehensive mitigation plan. Analysis of precision LiDAR elevation maps has concluded that there is no evidence of recent faulting near the target well. A borehole televiewer image log of the well bore revealed over three hundred fractures and predicted stress orientations. No natural, background seismicity has been identified in a review of historic data, or in more than seven months of seismic data recorded on an array of seven seismometers operating around the target well. A seismic hazards and induced seismicity risk assessment by an independent consultant concluded that the Demonstration would contribute no additional risk to residents of the nearest town of La Pine, Oregon. In Phase II of the demonstration, an existing deep hot well, NWG 55-29, will be stimulated using hydroshearing techniques to create an EGS reservoir. The Newberry Volcano EGS Demonstration is allowing geothermal industry and academic experts to develop, validate and enhance geoscience and engineering techniques, and other procedures essential to the expansion of EGS throughout the country. Successful development will demonstrate to the American public that EGS can play a significant role in reducing foreign energy dependence, and provide clean, renewable, baseload geothermal power generation in the State of Oregon.« less

  17. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moss, R. H.; Blohm, A. J.; Delgado, A.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before finalmore » conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure; (4) Vulnerability assessments can be connected to efforts to improve facility resilience to motivate participation; and (5) Efficient, scalable methods for vulnerability assessment can be developed, but additional case studies and evaluation are required.« less

  18. 2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, G.

    2013-03-18

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less

  19. Development of a Tool for Siting Low Impact Development in Urban Watersheds

    NASA Astrophysics Data System (ADS)

    Martin-Mikle, C.; de Beurs, K.; Julian, J.

    2013-12-01

    Low impact development (LID) -- a comprehensive land use planning and design approach with the goal of mitigating development impacts on hydrologic/nutrient cycles and ecosystems -- is increasingly being touted as an effective approach to lessen overland runoff and pollutant loadings. Examples of LIDs include riparian buffers, grassed swales, detention/retention ponds, rain gardens, green roofs and rain barrels. Broad-scale decision support tools for siting LIDs have been developed for agricultural watersheds, but are rare for urban watersheds, largely due to greater land use complexity and lack of necessary high-resolution geospatial data. Here, we develop a framework to assist city planners and water quality managers in siting LIDs in urban watersheds. One key component of this research is a framework accessible to those interested in using it. Hence, development of the framework has centered around 1) determining optimal data requirements for siting LID in an urban watershed and 2) developing a tool compatible with both open-source and commercial GIS software. We employ a wide variety of landscape metrics to evaluate the tool. A case study of the Lake Thunderbird Watershed, an urbanized watershed southeast of Oklahoma City, illustrates the effectiveness of a tool that is capable of siting LID in an urban watershed.

  20. Stochastic empirical loading and dilution model (SELDM) version 1.0.0

    USGS Publications Warehouse

    Granato, Gregory E.

    2013-01-01

    The Stochastic Empirical Loading and Dilution Model (SELDM) is designed to transform complex scientific data into meaningful information about the risk of adverse effects of runoff on receiving waters, the potential need for mitigation measures, and the potential effectiveness of such management measures for reducing these risks. The U.S. Geological Survey developed SELDM in cooperation with the Federal Highway Administration to help develop planning-level estimates of event mean concentrations, flows, and loads in stormwater from a site of interest and from an upstream basin. Planning-level estimates are defined as the results of analyses used to evaluate alternative management measures; planning-level estimates are recognized to include substantial uncertainties (commonly orders of magnitude). SELDM uses information about a highway site, the associated receiving-water basin, precipitation events, stormflow, water quality, and the performance of mitigation measures to produce a stochastic population of runoff-quality variables. SELDM provides input statistics for precipitation, prestorm flow, runoff coefficients, and concentrations of selected water-quality constituents from National datasets. Input statistics may be selected on the basis of the latitude, longitude, and physical characteristics of the site of interest and the upstream basin. The user also may derive and input statistics for each variable that are specific to a given site of interest or a given area. SELDM is a stochastic model because it uses Monte Carlo methods to produce the random combinations of input variable values needed to generate the stochastic population of values for each component variable. SELDM calculates the dilution of runoff in the receiving waters and the resulting downstream event mean concentrations and annual average lake concentrations. Results are ranked, and plotting positions are calculated, to indicate the level of risk of adverse effects caused by runoff concentrations, flows, and loads on receiving waters by storm and by year. Unlike deterministic hydrologic models, SELDM is not calibrated by changing values of input variables to match a historical record of values. Instead, input values for SELDM are based on site characteristics and representative statistics for each hydrologic variable. Thus, SELDM is an empirical model based on data and statistics rather than theoretical physiochemical equations. SELDM is a lumped parameter model because the highway site, the upstream basin, and the lake basin each are represented as a single homogeneous unit. Each of these source areas is represented by average basin properties, and results from SELDM are calculated as point estimates for the site of interest. Use of the lumped parameter approach facilitates rapid specification of model parameters to develop planning-level estimates with available data. The approach allows for parsimony in the required inputs to and outputs from the model and flexibility in the use of the model. For example, SELDM can be used to model runoff from various land covers or land uses by using the highway-site definition as long as representative water quality and impervious-fraction data are available.

  1. ALLOCATION OF MONITORING SITES FOR REGIONAL SURVEYS OF HYDROLOGIC UNITS

    EPA Science Inventory

    In order to characterize the ecological condition of Pacific Northwest watersheds and their aquatic ecosystems, interagency teams have developed the Aquatic and Riparian Effectiveness Monitoring Plan. Monitoring is targeted at the subwatershed scale (6th-field Hydrologic Unit Co...

  2. Recreation for All.

    ERIC Educational Resources Information Center

    Winston, Alan G., Ed.; Seekins, Nancy, Ed.

    The manual is intended to provide guidelines for the planning and development of parks and recreation facilities which are accessbile to everyone. Separate chapters present guidelines for the following topics (sample subtopics in parentheses): general information (space relationships and wheelchair functions); general site conditions (soil…

  3. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  4. 3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  5. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less

  6. Planners to the rescue: spatial planning facilitating the development of offshore wind energy.

    PubMed

    Jay, Stephen

    2010-04-01

    The development of offshore wind energy has started to take place surprisingly quickly, especially in North European waters. This has taken the wind energy industry out of the territory of planning systems that usually govern the siting of wind farms on land, and into the world of departmental, sectoral regulation of marine activities. Although this has favoured the expansion of offshore wind energy in some respects, evidence suggests that the practice and principles of spatial planning can make an important contribution to the proper consideration of proposals for offshore wind arrays. This is especially so when a strategic planning process is put in place for marine areas, in which offshore wind is treated as part of the overall configuration of marine interests, so that adjustments can be made in the interests of wind energy. The current process of marine planning in the Netherlands is described as an illustration of this. (c) 2009 Elsevier Ltd. All rights reserved.

  7. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH),more » Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.« less

  8. The concept and evolution of involved site radiation therapy for lymphoma.

    PubMed

    Specht, Lena; Yahalom, Joachim

    2015-10-01

    We describe the development of radiation therapy for lymphoma from extended field radiotherapy of the past to modern conformal treatment with involved site radiation therapy based on advanced imaging, three-dimensional treatment planning and advanced treatment delivery techniques. Today, radiation therapy is part of the multimodality treatment of lymphoma, and the irradiated tissue volume is much smaller than before, leading to highly significant reductions in the risks of long-term complications.

  9. Comparing Methods for Prioritising Protected Areas for Investment: A Case Study Using Madagascar’s Dry Forest Reptiles

    PubMed Central

    Gardner, Charlie J.; Raxworthy, Christopher J.; Metcalfe, Kristian; Raselimanana, Achille P.; Smith, Robert J.; Davies, Zoe G.

    2015-01-01

    There are insufficient resources available to manage the world’s existing protected area portfolio effectively, so the most important sites should be prioritised in investment decision-making. Sophisticated conservation planning and assessment tools developed to identify locations for new protected areas can provide an evidence base for such prioritisations, yet decision-makers in many countries lack the institutional support and necessary capacity to use the associated software. As such, simple heuristic approaches such as species richness or number of threatened species are generally adopted to inform prioritisation decisions. However, their performance has never been tested. Using the reptile fauna of Madagascar’s dry forests as a case study, we evaluate the performance of four site prioritisation protocols used to rank the conservation value of 22 established and candidate protected areas. We compare the results to a benchmark produced by the widely-used systematic conservation planning software Zonation. The four indices scored sites on the basis of: i) species richness; ii) an index based on species’ Red List status; iii) irreplaceability (a key metric in systematic conservation planning); and, iv) a novel Conservation Value Index (CVI), which incorporates species-level information on endemism, representation in the protected area system, tolerance of habitat degradation and hunting/collection pressure. Rankings produced by the four protocols were positively correlated to the results of Zonation, particularly amongst high-scoring sites, but CVI and Irreplaceability performed better than Species Richness and the Red List Index. Given the technological capacity constraints experienced by decision-makers in the developing world, our findings suggest that heuristic metrics can represent a useful alternative to more sophisticated analyses, especially when they integrate species-specific information related to extinction risk. However, this can require access to, and understanding of, more complex species data. PMID:26162073

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  11. 75 FR 27997 - Record of Decision (ROD) for the Development and Implementation of Range-Wide Mission and Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... (FEIS), including the following proposed land use changes: expansion of the Main Post and alterations in..., and increase in the level of test activities; development of six new Specialized Areas (four for test... Strategy Plan and siting process for facilitating future tests and training activities at WSMR; and...

  12. A Study of Special Education Teachers' TPACK Development in Mathematics and Science through Assessment of Lesson Plans

    ERIC Educational Resources Information Center

    Lyublinskaya, Irina; Tournaki, Nelly

    2014-01-01

    Invited as a paper from SITE 2013. This study focuses on the development of Technological Pedagogical And Content Knowledge (TPACK) in mathematics and science of pre-service special education teachers for teaching mathematics and science via one course. This course introduces a variety of strategies and techniques for using instructional…

  13. Teaching Tennessee History: Lesson Plans for the Classroom. Volume III.

    ERIC Educational Resources Information Center

    Oakley, Lisa, Ed.

    These teacher developed lessons focus on the impact of the New Deal and World War II on east Tennessee. The forum for developing the lessons included a series of lectures by experts in 20th-century scholarship and interpretation, tours, and experiences at historic sites in the region. During the week long program, teachers traveled throughout east…

  14. Teaching Tennessee History: Lesson Plans for the Classroom. Volume II.

    ERIC Educational Resources Information Center

    Oakley, Lisa, Ed.

    These teacher developed lessons focus on the Civil War's impact on east Tennessee. The forum for develop ling the lessons includes a series of inservice lectures by experts in the areas of Civil War scholarship and interpretation, tours, and hands-on experiences at historic sites in the region. During the week-long program, teachers traveled…

  15. Development of coarse-scale spatial data for wildland fire and fuel management

    Treesearch

    Kirsten M. Schmidt; James P. Menakis; Colin C. Hardy; Wendall J. Hann; David L. Bunnell

    2002-01-01

    We produced seven coarse-scale, 1-km2 resolution, spatial data layers for the conterminous United States to support national-level fire planning and risk assessments. Four of these layers were developed to evaluate ecological conditions and risk to ecosystem components: Potential Natural Vegetation Groups, a layer of climax vegetation types representing site...

  16. A Development Program for Metropolitan Junior College, Kansas City. Volume One: Executive Summary.

    ERIC Educational Resources Information Center

    Little (Arthur D.), Inc., San Francisco, CA.

    This five-part report provides a summary of the findings and recommendations resulting from a study conducted to determine the most suitable sites for three Metropolitan Junior College (MJC) campuses and to formulate long-range plans for the development of a comprehensive institution. After presenting introductory material, Part I notes problems…

  17. Multiple criteria approach to site selection of radioactive waste disposal facility in the Republic of Croatia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaller, A.; Skanata, D.

    1995-12-31

    Site selection approach to radioactive waste disposal facility, which is under way in Croatia, is presented in the paper. This approach is based on application of certain relevant terrestrial and technical criteria in the site selection process. Basic documentation used for this purpose are regional planning documents prepared by the Regional Planning Institute of Croatia. The basic result of research described in the paper is the proposal of several potential areas which are suitable for siting a radioactive waste repository. All relevant conclusions are based on both data groups -- generic and on-field experienced (measured). Out of a dozen potentialmore » areas, four have been chosen as representative by the authors. The presented comparative analysis was made by means of the VISA II computer code, developed by the V. Belton and SPV Software Products. The code was donated to the APO by the IAEA. The main objective of the paper is to initiate and facilitate further discussions on possible ways of evaluation and comparison of potential areas for sitting of radioactive waste repository in this country, as well as to provide additional contributions to the current site selection process in the Republic of Croatia.« less

  18. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, T.E.

    1993-10-01

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE`s preliminary evaluations of the development of treatment capacitiesmore » and technologies for treating a site`s MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years.« less

  19. Health plan competition in local markets.

    PubMed

    Grossman, J M

    2000-04-01

    To examine the structure of local health insurance markets and the strategies health plans were using to respond to competitive pressures in local markets in 1996/1997. Community Tracking Study site visits conducted between May 1996 and April 1997 in 12 U.S. markets selected to be nationally representative. In each site, 36 to 60 interviews on local health system change were conducted with healthcare industry informants representing health plans, providers, and purchasers. Relevant data for this article were abstracted from standardized protocols administered to multiple respondents in each site. Although the competitive threat from national plans was pervasive, local plans in most sites continued to retain strong, often dominant, positions in historically concentrated markets. In all sites, in response to purchaser pressures for stable premiums and provider choice, and the threat of entry and to plans were using three strategies to increase market share and market power: (1) consolidation/geographic expansion, (2) price competition, and (3) product line/segment diversification that focused on broad networks and open-access products. In most markets, in response to the demand for provider choice, the trend was away from ownership and exclusive arrangements with providers. Although local plans were moving to become full-service regional players, there was uncertainty about the abilities of all plans to sustain growth strategies at the expense of margins and organizational stability, and to effectively manage care with broad networks.

  20. Hanford Site Asbestos Abatement Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mewes, B.S.

    The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less

  1. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  2. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  3. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  4. Combining ecosystem services assessment with structured decision making to support ecological restoration planning.

    PubMed

    Martin, David M; Mazzotta, Marisa; Bousquin, Justin

    2018-04-10

    Accounting for ecosystem services in environmental decision making is an emerging research topic. Modern frameworks for ecosystem services assessment emphasize evaluating the social benefits of ecosystems, in terms of who benefits and by how much, to aid in comparing multiple courses of action. Structured methods that use decision analytic-approaches are emerging for the practice of ecological restoration. In this article, we combine ecosystem services assessment with structured decision making to estimate and evaluate measures of the potential benefits of ecological restoration with a case study in the Woonasquatucket River watershed, Rhode Island, USA. We partnered with a local watershed management organization to analyze dozens of candidate wetland restoration sites for their abilities to supply five ecosystem services-flood water retention, scenic landscapes, learning opportunities, recreational opportunities, and birds. We developed 22 benefit indicators related to the ecosystem services as well as indicators for social equity and reliability that benefits will sustain in the future. We applied conceptual modeling and spatial analysis to estimate indicator values for each candidate restoration site. Lastly, we developed a decision support tool to score and aggregate the values for the organization to screen the restoration sites. Results show that restoration sites in urban areas can provide greater social benefits than sites in less urban areas. Our research approach is general and can be used to investigate other restoration planning studies that perform ecosystem services assessment and fit into a decision-making process.

  5. Integrated platform for optimized solar PV system design and engineering plan set generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adeyemo, Samuel

    2015-12-30

    The Aurora team has developed software that allows users to quickly generate a three-dimensional model for a building, with a corresponding irradiance map, from any two-dimensional image with associated geo-coordinates. The purpose of this project is to build upon that technology by developing and distributing to solar installers a software platform that automatically retrieves engineering, financial and geographic data for a specific site, and quickly generates an optimal customer proposal and corresponding engineering plans for that site. At the end of the project, Aurora’s optimization platform would have been used to make at least one thousand proposals from at leastmore » ten unique solar installation companies, two of whom would sign economically viable contracts to use the software. Furthermore, Aurora’s algorithms would be tested to show that in at least seventy percent of cases, Aurora automatically generated a design equivalent to or better than what a human could have done manually. A ‘better’ design is one that generates more energy for the same cost, or that generates a higher return on investment, while complying with all site-specific aesthetic, electrical and spatial requirements.« less

  6. Evaluation of Flygt Propeller Xixers for Double Shell Tank (DST) High Level Waste Auxiliary Solids Mobilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PACQUET, E.A.

    The River Protection Project (RPP) is planning to retrieve radioactive waste from the single-shell tanks (SST) and double-shell tanks (DST) underground at the Hanford Site. This waste will then be transferred to a waste treatment plant to be immobilized (vitrified) in a stable glass form. Over the years, the waste solids in many of the tanks have settled to form a layer of sludge at the bottom. The thickness of the sludge layer varies from tank to tank, from no sludge or a few inches of sludge to about 15 ft of sludge. The purpose of this technology and engineeringmore » case study is to evaluate the Flygt{trademark} submersible propeller mixer as a potential technology for auxiliary mobilization of DST HLW solids. Considering the usage and development to date by other sites in the development of this technology, this study also has the objective of expanding the knowledge base of the Flygt{trademark} mixer concept with the broader perspective of Hanford Site tank waste retrieval. More specifically, the objectives of this study delineated from the work plan are described.« less

  7. REopt Screenings Catalyze Development of Hundreds of Megawatts of Renewable Energy for Federal Agencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Federal Energy Management Program (FEMP) offers renewable energy project assistance to federal agencies, which often begins with a desktop screening to develop a prioritized portfolio of project opportunities. FEMP uses the National Renewable Energy Laboratory's REopt energy planning platform to screen potential renewable energy opportunities at a single site or across a range of sites. REopt helps organizations prioritize the most economi­cally and technically viable projects for further study and identifies the size and mix of technologies that meet the orga­nization's goals at minimum cost, along with the optimal operating strategies.

  8. Organizing a Community Advanced Pharmacy Practice Experience

    PubMed Central

    Koenigsfeld, Carrie Foust; Tice, Angela L

    2006-01-01

    Setting up a community advanced pharmacy practice experience can be an overwhelming task for many pharmacy preceptors. This article provides guidance to pharmacist preceptors in developing a complete and effective community advanced pharmacy practice experience (APPE). When preparing for the APPE, initial discussions with the college or school of pharmacy are key. Benefits, training, and requirements should be addressed. Site preparation, including staff education, will assist in the development process. The preceptor should plan orientation day activities and determine appropriate evaluation and feedback methods. With thorough preparation, the APPE will be rewarding for both the student and the pharmacy site. PMID:17136163

  9. Organizing a community advanced pharmacy practice experience.

    PubMed

    Koenigsfeld, Carrie Foust; Tice, Angela L

    2006-02-15

    Setting up a community advanced pharmacy practice experience can be an overwhelming task for many pharmacy preceptors. This article provides guidance to pharmacist preceptors in developing a complete and effective community advanced pharmacy practice experience (APPE). When preparing for the APPE, initial discussions with the college or school of pharmacy are key. Benefits, training, and requirements should be addressed. Site preparation, including staff education, will assist in the development process. The preceptor should plan orientation day activities and determine appropriate evaluation and feedback methods. With thorough preparation, the APPE will be rewarding for both the student and the pharmacy site.

  10. Liposomal systems as viable drug delivery technology for skin cancer sites with an outlook on lipid-based delivery vehicles and diagnostic imaging inputs for skin conditions'.

    PubMed

    Akhtar, Naseem; Khan, Riaz A

    2016-10-01

    Skin cancer is among one of the most common human malignancies wide-spread world-over with mortality statistics rising continuously at an alarming rate. The increasing frequency of these malignancies has marked the need for adopting effective treatment plan coupled with better and site-specific delivery options for the desired therapeutic agent's availability at the affected site. The concurrent delivery approaches to cancerous tissues are under constant challenge and, as a result, are evolving and gaining advancements in terms of delivery modes, therapeutic agents and site-specificity of the therapeutics delivery. The lipid-based liposomal drug delivery is an attractive and emerging option, and which is meticulously shaping up beyond a threshold level to a promising, and viable route for the effective delivery of therapeutic agents and other required injuctions to the skin cancer. An update on liposomal delivery of chemotherapeutic agents, natural-origin compounds, photosensitizer, and DNA repair enzymes as well as other desirable and typical delivery modes employed in drug delivery and in the treatment of skin cancers is discussed in details. Moreover, liposomal delivery of nucleic acid-based therapeutics, i.e., small interfering RNA (siRNA), mRNA therapy, and RGD-linked liposomes are among the other promising novel technology under constant development. The current clinical applicability, viable clinical plans, future prospects including transport feasibility of delivery vesicles and imaging techniques in conjunction with the therapeutic agents is also discussed. The ongoing innovations in liposomal drug delivery technology for skin cancers hold promise for further development of the methodology for better, more effective and site-specific delivery as part of the better treatment plan by ensuring faster drug transport, better and full payload delivery with enough and required concentration of the dose. Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Improving Student Safety.

    ERIC Educational Resources Information Center

    Dorn, Michael; Trump, Kenneth S.; Nichols, R. Leslie

    2001-01-01

    Presents the latest information on how schools can keep their students safe. Safety oriented actions discussed cover incident reporting and tracking, tactical site surveys, school safety and emergency operations planning, staff development efforts, and facility design. Explains the need to review and test specific prevention concepts and emergency…

  12. Development of a Tool for Documenting, Tracking, Recording, and Analyzing Improvements to Intersection Sites and Roadway Departures in Curve Locations : Research Project Capsule

    DOT National Transportation Integrated Search

    2012-09-01

    Intermodal transportation : system planning, design, : improvement, performance : evaluation, or economic : assessments include safety : improvements because they : lower the overall cost of : transportation. State Departments of Transportation (DOTs...

  13. Facility Design Considerations.

    ERIC Educational Resources Information Center

    Chase, William W.

    1967-01-01

    Increasing need for vocational education under the impetus of federal aid is generating a demand for vocational teaching facilities. Factors to be considered in planning these facilities inclued--(1) site development, (2) program needs, (3) administrative considerations, (4) environmental controls. (5) mechanical systems, and (6) area and space…

  14. Best management practices used by KYTC for on-site erosion control.

    DOT National Transportation Integrated Search

    2006-11-01

    New erosion control procedures (ECP) have recently been implemented by the Kentucky Transportation Cabinet (KYTC). Previously, consultants and designers developed the ECP as a part of the design plans. In many cases these did not work in the field. T...

  15. Sample Return in Preparation for Human Mission on the Surface of Mars

    NASA Astrophysics Data System (ADS)

    Yun, P.

    2018-04-01

    Returned samples of martian regolith will help the science community make an informed decision in choosing the final human landing site and develop a better human mission plan to meet science criteria and IRSU and civil engineering criteria.

  16. 7 CFR 1924.122 - Exception authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Exception authority. 1924.122 Section 1924.122 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... REGULATIONS CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.122 Exception...

  17. 7 CFR 1924.103 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Scope. 1924.103 Section 1924.103 Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.103 Scope. This subpart provides...

  18. 7. Photocopy of blue line drawing (on file at La ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of blue line drawing (on file at La Grande District Office, La Grande, Oregon) USDA Forest Service, 1965 MASTER SITE DEVELOPMENT PLAN - Union Ranger District Compound, Fronting State Highway 203, at West edge of Union, Union, Union County, OR

  19. Planning of Agro-Tourism Development, Specific Location in Green Open Space Sarbagita Area, Bali Province

    NASA Astrophysics Data System (ADS)

    Lanya, I.; Subadiyasa, N.; Sardiana, K.; Ratna Adi, G. P.

    2018-02-01

    Tourism development has a negative impact on agricultural land in Bali, resulted in the transfer of rice field of 800 ha/year. Subak rice field area as a world cultural heritage, requires conservation strategy, increasing economic and environmental value, through integrated agriculture development with tourism. Tourism destination planning in the form of tourist destination (TD) and tourism object (TO) by raising local genius, at specific location, is expected to preserve nature and culture, as well as the economic value of the region. Research Methods: (1) identification of agrarian cultures, (2) field survey, (3) mapping of site specific TD/TO plans, and (4) compile documents of agro-tourism road map based on local genius. Seven subak areas in the green open space area have the potential to develop new TD/TO, namely: (1) Gedon2Subak in Tanah Lot area, is developed for the preservation of agriculture, the implementation of the zoning plan of the sacred, madya and nista areas, (2) the Kerdung and Penatih Subak areas, developed for urban farming in Denpasar City, (3) Cangi south Subak area, built for agro-tourism plasmanutfah banana and Cemagi Let Subak area developed agro-tourism food crops and horticulture, (4) Erjeruk Subak area, developed tourism plasmanutfah coconut.

  20. Development of the INEEL Site Wide Vadose Zone Roadmap

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yonk, Alan Keith

    2001-09-01

    The INEEL Vadose Zone Roadmap was developed to identify inadquacies in current knowledge, to assist in contaminant management capabilities relative to the INEEL vadose zone, and to ensure that ongoing and planned Science and Technology developments will meet the risk management challenges facing the INEEL in coming years. The primary objective of the Roadmap is to determine the S&T needs that will facilitate monitoring, characterization, prediction, and assessment activities necessary to support INEEL risk management decisions and to ensure that long-term stewardship of contaminated sites at the INEEL is achieved. The mission of the Roadmap is to insure that themore » long-term S&T strategy is aligned with site programs, that it takes advantage of progress made to date, and that it can assist in meeting the milestones and budgets of operations.« less

  1. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  2. 23. Photographic copy of an asconstructed site plan for North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of an as-constructed site plan for North Base: Air Force Flight Test Center, Edwards Air Force Base, Edwards, California: North Base Site Plan, February 1970. This drawing shows the North Base building distribution substantially as it appears in 1995. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  3. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  4. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  5. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  6. MONROE COMMUNITY COLLEGE CAMPUS PLAN.

    ERIC Educational Resources Information Center

    Caudill, Rowlett, Scott and Associates, Bryan, TX.

    THE MASTER PLANS FOR THE CONSTRUCTION OF THE CAMPUS OF THE NEW MONROE COMMUNITY COLLEGE INCLUDE EDUCATIONAL SPECIFICATIONS, SITE ANALYSIS DATA AND BUILDING PLANS. THE EDUCATIONAL SPECIFICATIONS ARE BASED UPON COMMUNITY NEEDS AND ENROLLMENT PROJECTIONS, AND REFLECT SPACE REQUIREMENTS. IN THE SITE ANALYSIS, FACTORS SUCH AS TOPOGRAPHY, CLIMATE,…

  7. Site support program plan for ICF Kaiser Hanford Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  8. Strategic use of the underground for an energy mix plan, synergies among CO2 and CH4 Geological Storage and Geothermal Energy: Italian Energy review and Latium case study

    NASA Astrophysics Data System (ADS)

    Procesi, M.; Cantucci, B.; Buttinelli, M.; Armezzani, G.; Quattrocchi, F.

    2012-04-01

    Since the world-wide energy demand has been growing so much in the last years, it is necessary to develop a strategic mix-energy plan to supply low GHG (GreenHouseGas) emissions energy and solve the problem of CO2 emission increasing. A recent study published by European Commission shows that, if existing trends continue, by 2050 CO2 emissions will be unsustainably high: 900-1000 parts per million by volume. The European Commission in 2007 underline the necessity to elaborate, at European level, a Strategic Energy Technology Plan focused on non-carbon or reduced-carbon sources of energy, as renewable energies, CO2 capture and storage technologies, smart energy networks and energy efficiency and savings. Future scenarios for 2030 elaborated by the International Energy Agency (IEA) shows as a mix energy plan could reduce the global CO2 emissions from 27Gt to 23 Gt (about 15%). A strategic use of the underground in terms of: - development of CCS (Carbon dioxide Capture and Storage) associated to fossil fuel combustion; - increase of CH4 geological storage sites; - use of renewable energies as geothermic for power generation; could open a new energy scenario, according to the climate models published by IPCC. Nowadays CCS market is mainly developed in USA and Canada, but still not much accounted in Europe. In Italy there aren't active CCS projects, even if potential areas have been already identified. Many CH4 storage sites are located in Northern America, while other are present in Europe and Italy, but the number of sites is limited despite the huge underground potentiality. In Italy the power generation from geothermal energy comes exclusively from Tuscany (Larderello-Travale and Mt. Amiata geothermal fields) despite the huge potentiality of other regions as Latium, Campania and Sicily (Central and South Italy). The energy deficit and the relevant CO2 emissions represent a common status for many Italian regions, especially for the Latium Region. This suggests that a new energy plan to improve the efficiency and the environmental sustainability is necessary. The evaluations of potential areas suitable for CO2 and/or CH4 geological storage and geothermal energy in the Latium region, have been done through a revisiting of public data such as well composite logs and maps. For the selection has been taken in account too, exclusion criteria sites as well as presence of geological risks and natural protected areas. Then the storage capacity and geothermal potentiality have been estimated for the selected areas. Finally, considering the hypothesized energy mix plan, an evaluation of the potential CO2 emissions decrease has been done. Preliminary results are encouraging to extent this evaluation also in other regions to improve a National Energy Plan.

  9. Strategic plan for infrastructure optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, C.D.

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less

  10. A Spatial-Economic Cost-Reduction Pathway Analysis for U.S. Offshore Wind Energy Development from 2015–2030

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beiter, Philipp; Musial, Walter; Smith, Aaron

    This report describes a comprehensive effort undertaken by the National Renewable Energy Laboratory (NREL) to understand the cost of offshore wind energy for markets in the United States. The study models the cost impacts of a range of offshore wind locational cost variables for more than 7,000 potential coastal sites in U.S. offshore wind resource areas. It also assesses the impact of more than 50 technology innovations on potential future costs for both fixed-bottom and floating wind systems. Comparing these costs to an initial site-specific assessment of local avoided generating costs, the analysis provides a framework for estimating the economicmore » potential for offshore wind. The analysis is intended to inform a broad set of stakeholders and enable an assessment of offshore wind as part of energy development and energy portfolio planning. It provides information that federal and state agencies and planning commissions could use to inform initial strategic decisions about offshore wind developments in the United States.« less

  11. Connecting Projects to Complete the In Situ Resource Utilization Paradigm

    NASA Technical Reports Server (NTRS)

    Linne, Diane L.; Sanders, Gerald B.

    2017-01-01

    Terrain Identify specifics such as slope, rockiness, traction parameters Identify what part of ISRU needs each Physical Geotechnical Hardness, density, cohesion, etc. Identify what part of ISRU needs each (e.g., excavation needs to know hardness, density; soil processing needs to know density, cohesion; etc.)Mineral Identify specifics Identify what part of ISRU needs each Volatile Identify specifics Identify what part of ISRU needs each Atmosphere Identify specifics Identify what part of ISRU needs each Environment Identify specifics Identify what part of ISRU needs each Resource Characterization What: Develop an instrument suite to locate and evaluate the physical, mineral, and volatile resources at the lunar poles Neutron Spectrometer Near Infrared (IR) to locate subsurface hydrogen surface water Near IR for mineral identification Auger drill for sample removal down to 1 m Oven with Gas Chromatograph Mass Spectrometer to quantify volatiles present ISRU relevance: Water volatile resource characterization and subsurface material access removal Site Evaluation Resource Mapping What: Develop and utilize new data products and tools for evaluating potential exploration sites for selection and overlay mission data to map terrain, environment, and resource information e.g., New techniques applied to generate Digital Elevation Map (DEMs) at native scale of images (1mpxl)ISRU relevance: Resource mapping and estimation with terrain and environment information is needed for extraction planning Mission Planning and Operations What: Develop and utilize tools and procedures for planning mission operations and real time changes Planning tools include detailed engineering models (e.g., power and data) of surface segment systems allows evaluation of designs ISRU relevance: Allows for iterative engineering as a function of environment and hardware performance.

  12. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  13. Phase I Investigations at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, in 2010-2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report presents the technical findings of Phase I of Argonne’s studies. The Phase I field investigation was initiated on October 18, 2010. The work was conducted in accord with (1) the final site-specific Phase I Work Plan for Montgomery City (Argonne 2010; approved by the MDNR [2010]); (2) applicable Missouri regulations; and (3) the standard operating procedures, quality assurance/quality control (QA/QC) measures, and general health and safety policies outlined in the Master Work Plan (Argonne 2002) for operations in Kansas, which was reviewed by the MDNR and accepted for current use. A draft master plan specific to work inmore » Missouri and a set of draft standard operating procedures are in review with the MDNR. The site-specific Work Plan for Montgomery City (Argonne 2010) (1) summarizes the pre-existing knowledge base for the Montgomery City investigation site compiled by Argonne and (2) describes the site-specific technical objectives and the intended scope of work developed for the first phase of the investigation. Three primary technical objectives were identified for the Phase I studies, as follows: 1. Update the presently identified inventory and status of private and public drinking water wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for volatile organic compounds (VOCs) and geochemical analyses. In conjunction with this effort, determine the present sources(s) of drinking water for all residents in an approximate 0.5-mi radius of the former CCC/USDA facility. 2. Investigate for possible evidence of a soil source of carbon tetrachloride contamination in the unconsolidated sediments beneath the former CCC/USDA facility that might affect the underlying bedrock aquifer units. 3. Obtain preliminary information on the site-specific lithologic and hydrologic characteristics of the unconsolidated sediments overlying bedrock at the former CCC/USDA grain storage location. Section 2 of this report describes the investigative methods used in the 2010-2011 studies and provides a chronological summary of the field events conducted. Section 3 presents a summary of the resulting field and laboratory data. These data, together with information presented in the site-specific Work Plan (Argonne 2010), are interpreted and integrated in Section 4 to (1) develop a preliminary conceptual model of the hydrogeologic framework affecting groundwater and potential contaminant migration in the vicinity of the former CCC/USDA facility and (2) serve as a basis for the initial consideration of contaminant levels and potential exposure pathways that might be of concern in the evaluation of risks to human health, public welfare, and the environment. The working conclusions drawn from the 2010-2011 studies are presented, along with recommendations, in Section 5.« less

  14. Health diplomacy the adaptation of global health interventions to local needs in sub-Saharan Africa and Thailand: Evaluating findings from Project Accept (HPTN 043)

    PubMed Central

    2012-01-01

    Background Study-based global health interventions, especially those that are conducted on an international or multi-site basis, frequently require site-specific adaptations in order to (1) respond to socio-cultural differences in risk determinants, (2) to make interventions more relevant to target population needs, and (3) in recognition of ‘global health diplomacy' issues. We report on the adaptations development, approval and implementation process from the Project Accept voluntary counseling and testing, community mobilization and post-test support services intervention. Methods We reviewed all relevant documentation collected during the study intervention period (e.g. monthly progress reports; bi-annual steering committee presentations) and conducted a series of semi-structured interviews with project directors and between 12 and 23 field staff at each study site in South Africa, Zimbabwe, Thailand and Tanzania during 2009. Respondents were asked to describe (1) the adaptations development and approval process and (2) the most successful site-specific adaptations from the perspective of facilitating intervention implementation. Results Across sites, proposed adaptations were identified by field staff and submitted to project directors for review on a formally planned basis. The cross-site intervention sub-committee then ensured fidelity to the study protocol before approval. Successfully-implemented adaptations included: intervention delivery adaptations (e.g. development of tailored counseling messages for immigrant labour groups in South Africa) political, environmental and infrastructural adaptations (e.g. use of local community centers as VCT venues in Zimbabwe); religious adaptations (e.g. dividing clients by gender in Muslim areas of Tanzania); economic adaptations (e.g. co-provision of income generating skills classes in Zimbabwe); epidemiological adaptations (e.g. provision of ‘youth-friendly’ services in South Africa, Zimbabwe and Tanzania), and social adaptations (e.g. modification of terminology to local dialects in Thailand: and adjustment of service delivery schedules to suit seasonal and daily work schedules across sites). Conclusions Adaptation selection, development and approval during multi-site global health research studies should be a planned process that maintains fidelity to the study protocol. The successful implementation of appropriate site-specific adaptations may have important implications for intervention implementation, from both a service uptake and a global health diplomacy perspective. PMID:22716131

  15. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pat Matthews

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less

  16. A Task-oriented Approach for Hydrogeological Site Characterization

    NASA Astrophysics Data System (ADS)

    Rubin, Y.; Nowak, W.; de Barros, F.

    2010-12-01

    Hydrogeological site characterization is a challenging task from several reasons: (1) the large spatial variability and scarcity of prior information render the outcome of any planned sampling campaign uncertain; (2) there are no simple tools for comparing between the many alternative measurement techniques and data acquisition strategies, and (3) physical and budgetary constraints associated with data acquisition. This paper presents several ideas on how to plan sampling campaigns in a rational manner while addressing these challenges. The first idea is to recognize that different sites and different problems require different characterization strategies. Hence the idea is to plan data acquisition according to its capability for meeting site-specific goals. For example, the characterization needs at a “research problem” site (e.g., a site intended to investigate the transport of uranium in the subsurface such as in Hanford) are different from those of a “problem” site (e.g., contaminated site associated with a health risk to human such as Camp Lejeune, or determining the safe yield of an aquifer). This distinction requires planners to define the characterization goal(s) in a quantitative manner. The second idea is to define metrics that could link specific data types and data acquisition strategies with the site-specific goals in a way that would allow planners to compare between strongly different, alternatives strategies at the design stage (even prior to data acquisition) and to modify the strategies as more data become available. To meet this goal, we developed the concept of the (comparative) information yield curve. Finally, we propose to look at site characterization from the perspective of statistical hypothesis testing, whereby data acquisition strategies could be evaluated in terms of their ability to support or refute various hypotheses made with regard to the characterization goals, and the strategies could be modified once the test is completed. Accept/reject regions for hypothesis testing can be determined based on goals determined by regulations or by agreement between the stakeholders. Hypothesis-driven design could help in minimizing the chances of making wrong decision (false positives or false negatives) with regard to the site-specific goals.

  17. The Patroon Creek Contamination Migration Investigation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dufek, K.; Zafran, A.; Moore, J.T.

    2006-07-01

    Shaw performed a Site Investigation (SI) for sediment within the Unnamed Tributary of the Patroon Creek, a section of the Patroon Creek, and the Three Mile Reservoir as part of the overall contract with the United States Army Corps of Engineers (USACE) to remediate the Colonie Formerly Utilized Sites Remedial Action Program (FUSRAP) Site. The Unnamed Tributary formerly flowed through the former Patroon Lake, which was located on the main site property and was used as a landfill for radiological and chemical wastes. The objective of the investigation was to determine the absence/presence of radioactive contamination within the three Areasmore » of Concern (AOC). In order to accomplish this objective, Shaw assembled a team to produce a Technical Memorandum that provided an in-depth understanding of the environmental conditions related to the Patroon Creek. Upon completion and analysis of the Technical Memorandum, a Conceptual Site Model (CSM) was constructed and a Technical Planning Program (TPP) was held to develop a Sediment Investigation Work Plan and Sediment Investigation Sampling and Analysis Plan. A total of 32 sample locations were analyzed using on-site direct gamma scans with a Pancake Geiger-Mueller (PGM) instrument for screening purposes and samples were analyzed at on-site and off-site laboratories. The highest interval from each core scan was selected for on-site analysis utilizing a High Purity Germanium (HPGe) detector. Eight of these samples were sent off-site for gamma/alpha spectroscopy confirmation. The data collected during the SI indicated that the U-238 cleanup criterion was exceeded in sediment samples collected from two locations within the Unnamed Tributary but not in downstream sections of Patroon Creek or Three Mile Reservoir. Future actions for impacted sediment in the Unnamed Tributary will be further evaluated. Concentrations of U-238 and Th-232 in all other off-site sediment samples collected from the Unnamed Tributary, Patroon Creek, and the Three Mile Reservoir indicate that no further action is required in these areas. The data was also compared to ecological screening criteria. None of the contaminants of concern (U-238, Th-232, and U-235) had concentrations exceeding the screening values. The evaluation indicates no adverse impacts to ecological receptors. (authors)« less

  18. Instream biological assessment of NPDES point source discharges at the Savannah River Site, 1997-1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Specht, W.L.

    2000-02-28

    The Savannah River Site currently has 33 permitted NPDES outfalls that have been permitted by the South Carolina Department of Health an Environmental Control to discharge to SRS streams and the Savannah River. In order to determine the cumulative impacts of these discharges to the receiving streams, a study plan was developed to perform in-stream assessments of the fish assemblages, macroinvertebrate assemblages, and habitats of the receiving streams.

  19. Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less

  20. Case studies of conservation plans that incorporate geodiversity.

    PubMed

    Anderson, M G; Comer, P J; Beier, P; Lawler, J J; Schloss, C A; Buttrick, S; Albano, C M; Faith, D P

    2015-06-01

    Geodiversity has been used as a surrogate for biodiversity when species locations are unknown, and this utility can be extended to situations where species locations are in flux. Recently, scientists have designed conservation networks that aim to explicitly represent the range of geophysical environments, identifying a network of physical stages that could sustain biodiversity while allowing for change in species composition in response to climate change. Because there is no standard approach to designing such networks, we compiled 8 case studies illustrating a variety of ways scientists have approached the challenge. These studies show how geodiversity has been partitioned and used to develop site portfolios and connectivity designs; how geodiversity-based portfolios compare with those derived from species and communities; and how the selection and combination of variables influences the results. Collectively, they suggest 4 key steps when using geodiversity to augment traditional biodiversity-based conservation planning: create land units from species-relevant variables combined in an ecologically meaningful way; represent land units in a logical spatial configuration and integrate with species locations when possible; apply selection criteria to individual sites to ensure they are appropriate for conservation; and develop connectivity among sites to maintain movements and processes. With these considerations, conservationists can design more effective site portfolios to ensure the lasting conservation of biodiversity under a changing climate. © 2015 Society for Conservation Biology.

Top