Sample records for site development projects

  1. Conducting Site and Economic Renewable Energy Project Feasibility Assessments

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development's Conducting Site and Economic Renewable Energy Project Feasibility Assessments page provides tools and resources to evaluate solar project feasibility and economics that influence project development.

  2. An Initial Evaluation of Siting Considerations on Current and Future Wind Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, Suzanne; Lantz, Eric; Mai, Trieu

    This report provides a deeper understanding of the wind project development process, from desktop studies to a successful project in the ground. It examines three siting consideration categories that wind project sponsors must include in the development process: wildlife (species that live in, near, or migrate through the area where wind development is possible), radar (wind turbines can cause interference with radar signals), and public engagement (representing communities and stakeholders who live near wind power projects). The research shows that although this country's abundant wind resource provides numerous options for addressing siting considerations, actually siting individual projects is becoming moremore » difficult because of regulatory and other uncertainties. Model results are based on the premise that developers will be able to site, permit, and build successful projects, which is not always the case in reality.« less

  3. Past Project Expo Sites

    EPA Pesticide Factsheets

    This page provides information for Project Expo sites that were featured at the LMOP Conferences in 2013 and 2014. Project Expo sites were featured as being interested in identifying project partners for the development of an LFG energy project.

  4. Iterative performance assessments as a regulatory tool for evaluating repository safety: How experiences from SKI Project-90 were used in formulating the new performance assessment project SITE-94

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andersson, J.

    1993-12-31

    The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reasonmore » for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments.« less

  5. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  6. Geospatial Optimization of Siting Large-Scale Solar Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Macknick, Jordan; Quinby, Ted; Caulfield, Emmet

    2014-03-01

    Recent policy and economic conditions have encouraged a renewed interest in developing large-scale solar projects in the U.S. Southwest. However, siting large-scale solar projects is complex. In addition to the quality of the solar resource, solar developers must take into consideration many environmental, social, and economic factors when evaluating a potential site. This report describes a proof-of-concept, Web-based Geographical Information Systems (GIS) tool that evaluates multiple user-defined criteria in an optimization algorithm to inform discussions and decisions regarding the locations of utility-scale solar projects. Existing siting recommendations for large-scale solar projects from governmental and non-governmental organizations are not consistent withmore » each other, are often not transparent in methods, and do not take into consideration the differing priorities of stakeholders. The siting assistance GIS tool we have developed improves upon the existing siting guidelines by being user-driven, transparent, interactive, capable of incorporating multiple criteria, and flexible. This work provides the foundation for a dynamic siting assistance tool that can greatly facilitate siting decisions among multiple stakeholders.« less

  7. Review of potential EGS sites and possible EGS demonstration scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1999-09-01

    Review of potential sites for Enhanced Geothermal Systems (EGS) and development of reference scenarios for EGS demonstration projects are two sub-tasks included in the FY 1999 EGS Research and Development (R&D) Management Task (DOE Task Order Number DE-AT07-99ID60365, included in the Appendix of this report). These sub-tasks are consistent with the EGS Strategic Plan, which includes milestones relating to EGS site selection (Milestone 4, to be completed in 2004) and development of a cost-shared, pilot-scale demonstration project (Milestone 5, to be completed in 2008). The purpose of the present work is to provide some reference points for discussing what typemore » of EGS projects might be undertaken, where they might be located, and what the associated benefits are likely to be. The review of potential EGS sites is presented in Chapter 2 of this report. It draws upon site-selection criteria (and potential project sites that were identified using those criteria) developed at a mini-workshop held at the April 1998 DOE Geothermal Program Review to discuss EGS R&D issues. The criteria and the sites were the focus of a paper presented at the 4th International Hot Dry Rock Forum in Strasbourg in September 1998 (Sass and Robertson-Tait, 1998). The selection criteria, project sites and possible EGS developments discussed in the workshop and paper are described in more detail herein. Input from geothermal operators is incorporated, and water availability and transmission-line access are emphasized. The reference scenarios for EGS demonstration projects are presented in Chapter 3. Three alternative scenarios are discussed: (1) a stand-alone demonstration plant in an area with no existing geothermal development; (2) a separate generating facility adjacent to an existing geothermal development; and (3) an EGS project that supplies an existing geothermal power plant with additional generating capacity. Furthermore, information potentially useful to DOE in framing solicitations and selecting projects for funding is discussed objectively. Although defined as separate sub-tasks, the EGS site review and reference scenarios are closely related. The incremental approach to EGS development that has recently been adopted could logically be expected to yield proposals for studies that lead up to and include production-enhancement experiments in producing geothermal fields in the very near future. However, the strategic plan clearly calls for the development of a more comprehensive demonstration project that can generate up to perhaps 10 MW (gross). It is anticipated that a series of small-scale experiments will define what realistically may be achieved in the near future, thus setting the stage for a successful pilot demonstration. This report continues the process of presenting information on EGS sites and experiments, and begins the process of defining what a demonstration project might be.« less

  8. REGENERATIVE SITE LEARNING LABORATORY: A SITE INTERVENTION FOR SUSTAINABILITY EDUCATION

    EPA Science Inventory

    The project will indicate strategies that can be used to mitigate the negative impact of an existing developed site on a watershed and natural habitats. Additionally, the project design will inspire interest in ecological sustainability in an educational context. The project ...

  9. Chapter 3: Design of the Saber-Tooth Project.

    ERIC Educational Resources Information Center

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  10. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  11. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  12. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... lead-based paint activities, as required by part 35 of this title. (3) For both new construction and... on-site roads and sewer and water lines necessary to the development of the project. The project site...

  13. The Millennium Villages Project: a retrospective, observational, endline evaluation.

    PubMed

    Mitchell, Shira; Gelman, Andrew; Ross, Rebecca; Chen, Joyce; Bari, Sehrish; Huynh, Uyen Kim; Harris, Matthew W; Sachs, Sonia Ehrlich; Stuart, Elizabeth A; Feller, Avi; Makela, Susanna; Zaslavsky, Alan M; McClellan, Lucy; Ohemeng-Dapaah, Seth; Namakula, Patricia; Palm, Cheryl A; Sachs, Jeffrey D

    2018-05-01

    The Millennium Villages Project (MVP) was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs). In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero) and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero). Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the project sites. Total on-site spending decreased from US$132 per person in the first half of the project (of which $66 was from the MVP) to $109 per person in the second half of the project (of which $25 was from the MVP). The MVP had favourable impacts on outcomes in all MDG areas, consistent with an integrated rural development approach. The greatest effects were in agriculture and health, suggesting support for the project's emphasis on agriculture and health systems strengthening. The project conclusively met one third of its targets. The Open Society Foundations, the Islamic Development Bank, and the governments of Japan, South Korea, Mali, Senegal, and Uganda. Copyright © 2018 The Author(s). Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND 4.0 license. Published by Elsevier Ltd.. All rights reserved.

  14. Development of Tools and Techniques to Survey, Assess, Stabilise, Monitor and Preserve Underwater Archaeological Sites: SASMAP

    NASA Astrophysics Data System (ADS)

    Gregory, D. J.

    2015-08-01

    SASMAP's purpose is to develop new technologies and best practices in order to locate, assess and manage Europe's underwater cultural heritage in a more effective way than is possible today. SASMAP has taken an holistic- and process- based approach to investigating underwater environments and the archaeological sites contained therein. End user of the results of SASMAP are severalfold; i) to benefiet the SMEs involved in the project and development of their products for the offshore industry (not just for archaeological purposes) ii) a better understanding of the marine environment and its effect on archaeological materials iii) the collation of the results from the project into guidelines that can be used by cultural resource managers to better administer and optimise developer lead underwater archaeological project within Europe in accordance with European legislation (Treaty of Valetta (1992). Summarily the project has utilised a down scaling approach to localise archaeological sites at a large scale regional level. This has involved using innovative satellite imagery to obtain seamless topography maps over coastal areas and the seabed (accurate to a depth of 6m) as well as the development of a 3D sub bottom profiler to look within the seabed. Results obtained from the downscaling approach at the study areas in the project (Greece and Denmark) have enabled geological models to be developed inorder to work towards predictive modelling of where submerged prehistoric sites may be encountered. Once sites have been located an upscaling approach has been taken to assessing an individual site and the materials on and within it in order to better understand the state of preservation and dynamic conditions of a site and how it can best be preserved through in situ preservation or excavation. This has involved the development of equipment to monitor the seabed environment (open water and in sediments), equipment for sampling sediments and assessing the state of preservation of wood, once of the common materials on archaeological sites. The guidelines and all information and experiences obtained during the course of the project will be utilised to enhance and develop existing legislation and best practice for mapping and preserving Europe's underwater and coastal heritage. The project started in September 2012 and finished at the end of August 2015 and the aim of the paper is to give a brief introduction to the results of the project. Further information on the project is available at www.sasmap.eu

  15. India: From SITE to INSAT.

    ERIC Educational Resources Information Center

    Chaudhri, M. M.

    1986-01-01

    Identifies core of India's illiteracy problem and describes use of educational technology to educate rural children. Highlights include descriptions of the Satellite Instructional Television Experiment (SITE) project; motivation behind low-cost educational aids development in rural areas; an educational radio pilot project; and development and…

  16. Phase 2 environmental site investigation procedures and technologies for property transfer and PS and E development

    DOT National Transportation Integrated Search

    1999-05-01

    The purpose of this project is to provide TxDOT with an improved procedure for conducting environmental site investigations at various stages during transportation infrastructure development. The project seeks to identify modern assessment technologi...

  17. Remote terminal system evaluation

    NASA Technical Reports Server (NTRS)

    Phillips, T. L.; Grams, H. L.; Lindenlaub, J. C.; Schwingendorf, S. K.; Swain, P. H.; Simmons, W. R.

    1975-01-01

    An Earth Resources Data Processing System was developed to evaluate the system for training, technology transfer, and data processing. In addition to the five sites included in this project two other sites were connected to the system under separate agreements. The experience of these two sites is discussed. The results of the remote terminal project are documented in seven reports: one from each of the five project sites, Purdue University, and an overview report summarizing the other six reports.

  18. Cornell University remote sensing program. [application to waste disposal site selection, study of drainage patterns, and water quality management.

    NASA Technical Reports Server (NTRS)

    Liang, T.; Mcnair, A. J.; Philipson, W. R.

    1977-01-01

    Aircraft and satellite remote sensing technology were applied in the following areas: (1) evaluation of proposed fly ash disposal sites; (2) development of priorities for drainage improvements; (3) state park analysis for rehabilitation and development; (4) watershed study for water quality planning; and (5) assistance project-landfill site selection. Results are briefly summarized. Other projects conducted include: (1) assessment of vineyard-related problems; (2) LANDSAT analysis for pheasant range management; (3) photo-historic evaluation of Revolutionary War sites; and (4) thermal analysis of building insulation. The objectives, expected benefits and actions, and status of these projects are described.

  19. Procurement Specifications Templates for On-Site Solar Photovoltaic: For Use in Developing Federal Solicitations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, G.

    With the increasing adaption of on-site renewable energy systems designed to feed site loads, there is a critical need to develop tools that allow the federal sector to become a mature and sophisticated consumer. This document is intended to reduce project development and operational risks while increasing the speed at which projects are completed; two necessary components to reach the scale required to meet mandates and achieve cost savings for taxpayers. This guide is intended to act as a living document where lessons learned from the increasing number of projects can be incorporated and provide guidance for efforts. While additionalmore » guides will be developed to cover other renewable technologies, this guide covers on-site solar photovoltaic systems with an emphasis on third-party designed, financed, owned, and operated systems.« less

  20. PHYTOREMEDIATION OF TPH IN SOILS: AN RTDF PROJECT

    EPA Science Inventory

    The Remediation Technology Development Forum has undertaken a project to investigate the use of plants in remediation of sites contaminated by petroleum hydrocarbons. Since sites have been established at a number of locations the project will be able to consider climate, contain...

  1. Solid waste management complex site development plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  2. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  3. The ASCD Healthy School Communities Project: Formative Evaluation Results

    ERIC Educational Resources Information Center

    Valois, Robert F.; Lewallen, Theresa C.; Slade, Sean; Tasco, Adriane N.

    2015-01-01

    Purpose: The purpose of this paper is to report the formative evaluation results from the Association for Supervision and Curriculum Development Healthy School Communities (HSC) pilot project. Design/methodology/approach: This study utilized 11 HSC pilot sites in the USA (eight sites) and Canada (three sites). The evaluation question was…

  4. Learning to Design and Implement Educational Web Sites within Pre-Service Training: a Project-Based Learning Environment and its Impact on Student Teachers

    ERIC Educational Resources Information Center

    Papastergiou, Marina

    2005-01-01

    This paper reports on a project-based learning (PBL) environment targeted towards introducing student teachers to the design and development of educational web sites. The participants were 46 student teachers who constructed 16 web sites for primary school. A survey of their views, before and after the projects, and an evaluation of the web sites…

  5. Learning to Design and Implement Educational Web Sites within Pre-Service Training: A Project-Based Learning Environment and Its Impact on Student Teachers

    ERIC Educational Resources Information Center

    Papastergiou, Marina

    2005-01-01

    This paper reports on a project-based learning (PBL) environment targeted towards introducing student teachers to the design and development of educational web sites. The participants were 46 student teachers who constructed 16 web sites for primary school. A survey of their views, before and after the projects, and an evaluation of the web sites…

  6. A Process Research Framework: The International Process Research Consortium

    DTIC Science & Technology

    2006-12-01

    projects ? 52 Theme P | IPRC Framework 5 P-30 How should a process for collaborative development be formulated? The development at different companies...requires some process for the actual collaboration . How should it be handled? P-31 How do we handle change? Requirements change during development ...source projects employ a single-site development model in which there is no large community of testers but rather a single-site small group

  7. Support of US CLIVAR Project Office 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cummings, Donna

    Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and developmentmore » of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals« less

  8. Project M: Scale Model of Lunar Landing Site of Apollo 17: Focus on Lighting Conditions and Analysis

    NASA Technical Reports Server (NTRS)

    Vanik, Christopher S.; Crain, Timothy P.

    2010-01-01

    This document captures the research and development of a scale model representation of the Apollo 17 landing site on the moon as part of the NASA INSPIRE program. Several key elements in this model were surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. This model supports development of Autonomous Landing and Hazard Avoidance Technology (ALHAT) and Project M for the GN&C Autonomous Flight Systems Branch. It will help project engineers visualize the landing site, and is housed in the building 16 Navigation Systems Technology Lab. The lead mentor was Dr. Timothy P. Crain. The purpose of this project was to develop an accurate scale representation of the Apollo 17 landing site on the moon. This was done on an 8'2.5"X10'1.375" reduced friction granite table, which can be restored to its previous condition if needed. The first step in this project was to research the best way to model and recreate the Apollo 17 landing site for the mockup. The project required a thorough plan, budget, and schedule, which was presented to the EG6 Branch for build approval. The final phase was to build the model. The project also required thorough research on the Apollo 17 landing site and the topography of the moon. This research was done on the internet and in person with Dean Eppler, a space scientist, from JSC KX. This data was used to analyze and calculate the scale of the mockup and the ratio of the sizes of the craters, ridges, etc. The final goal was to effectively communicate project status and demonstrate the multiple advantages of using our model. The conclusion of this project was that the mockup was completed as accurately as possible, and it successfully enables the Project M specialists to visualize and plan their goal on an accurate three dimensional surface representation.

  9. CosmoQuest Year 1.5: Citizen Scientist Behaviors and Site Usage Across Multiple Projects

    NASA Astrophysics Data System (ADS)

    Gugliucci, Nicole E.; Gay, P. L.; Bracey, G.; CosmoQuest Team

    2013-06-01

    CosmoQuest launched as a citizen science portal in January 2012 and has since expanded to include three projects in planetary surface mapping, one completed project searching for KBOs, and several more on the way with various astrophysical science goals. We take a close look at how our users move through the site, how much time they spend on various tasks, project retention rate, and how many use multiple projects on the site. We are also piloting a citizen science motivation survey given to random site users to find out why citizen scientists join new projects and continue to participate. This is part of a larger project using online and real-life interactions to study citizen scientist behaviors, motivations, and learning with a goal of building better community with researchers, volunteers, educators, and developers.

  10. Communities ready for takeoffIntegrating social assets for biofuel site-selection modeling.

    PubMed

    Rijkhoff, Sanne A M; Hoard, Season A; Gaffney, Michael J; Smith, Paul M

    2017-01-01

    Although much of the social science literature supports the importance of community assets for success in many policy areas, these assets are often overlooked when selecting communities for new infrastructure facilities. Extensive collaboration is crucial for the success of environmental and economic projects, yet it often is not adequately addressed when making siting decisions for new projects. This article develops a social asset framework that includes social, creative, and human capital to inform site-selection decisions. This framework is applied to the Northwest Advanced Renewables Alliance project to assess community suitability for biofuel-related developments. This framework is the first to take all necessary community assets into account, providing insight into successful site selection beyond current models. The framework not only serves as a model for future biorefinery projects but also guides tasks that depend on informed location selection for success.

  11. 36 CFR 64.6 - Application procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... site including the type of development to be included in the project (if a site plan is available it... project will have any effect on a site in, or eligible for nomination to the National Register of Historic Places. The comments of the SHPO will be included with the application. (4) Flood Disaster Protection Act...

  12. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    NASA Astrophysics Data System (ADS)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  13. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  14. Development of a site analysis tool for distributed wind projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shaw, Shawn

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimatesmore » of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.« less

  15. Columbus Closure Project Released without Radiological Restrictions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henderson, G.

    2007-07-01

    The Columbus Closure Project (CCP), a historic radiological research complex, was cleaned up for future use without radiological restriction in 2006. The CCP research and development site contributed to national defense, nuclear fuel fabrication, and the development of safe nuclear reactors in the United States until 1988 when research activities were concluded for site decommissioning. In November of 2003, the Ohio Field Office of the U.S. Department of Energy contracted ECC/E2 Closure Services, LLC (Closure Services) to complete the removal of radioactive contamination from of a 1955 era nuclear sciences area consisting of a large hot cell facility, research reactormore » building and underground piping. The project known as the Columbus Closure Project (CCP) was completed in 27 months and brought to a close 16 years of D and D in Columbus, Ohio. This paper examines the project innovations and challenges presented during the Columbus Closure Project. The examination of the CCP includes the project regulatory environment, the CS safety program, accelerated clean up innovation, project execution strategies and management of project waste issues and the regulatory approach to site release 'without radiological restrictions'. (authors)« less

  16. Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elmer, John; Butherus, Michael; Barr, Deborah L.

    2013-07-01

    To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result ofmore » the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar PV project is feasible on the new sites. (authors)« less

  17. Blowing in the wind: evaluating wind energy projects on the national forests

    Treesearch

    Kerry Schlichting; Evan Mercer

    2011-01-01

    The 650 million ac of federal lands are facing increased scrutiny for wind energy development. As a result, the US Forest Service has been directed to develop policies and procedures for siting wind energy projects. We incorporate geospatial site suitability analysis with applicable policy and management principles to illustrate the use of a Spatial Decision Support...

  18. Virtual Diving in the Underwater Archaeological Site of Cala Minnola

    NASA Astrophysics Data System (ADS)

    Bruno, F.; Lagudi, A.; Barbieri, L.; Muzzupappa, M.; Mangeruga, M.; Pupo, F.; Cozza, M.; Cozza, A.; Ritacco, G.; Peluso, R.; Tusa, S.

    2017-02-01

    The paper presents the application of the technologies and methods defined in the VISAS project for the case study of the underwater archaeological site of Cala Minnola located in the island of Levanzo, in the archipelago of the Aegadian Islands (Sicily, Italy). The VISAS project (http://visas-project.eu) aims to improve the responsible and sustainable exploitation of the Underwater Cultural Heritage by means the development of new methods and technologies including an innovative virtual tour of the submerged archaeological sites. In particular, the paper describes the 3D reconstruction of the underwater archaeological site of Cala Minnola and focus on the development of the virtual scene for its visualization and exploitation. The virtual dive of the underwater archaeological site allows users to live a recreational and educational experience by receiving historical, archaeological and biological information about the submerged exhibits, the flora and fauna of the place.

  19. Nevada National Security Site Industrial Sites Project Closeout - 12498

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin; Krauss, Mark; Matthews, Pat

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is responsible for environmental restoration (ER) at the Nevada National Security Site (NNSS). This includes remediation at Industrial Sites where past nuclear testing activities and activities that supported nuclear testing may have or are known to have resulted in the release of contaminants into the environment. Industrial Sites at the NNSS have included nuclear facilities that supported the nuclear rocket/missile development programs, gas stations, landfills, spill sites, ordnance sites, and numerous other waste disposal and release sites. The NNSS Industrial Sites activities neared completion at the endmore » of fiscal year 2011 while other activities required under the Federal Facility Agreement and Consent Order (FFACO) and part of the same NNSS ER Project are forecasted to extend to 2027 or beyond. With the majority of Industrial Sites corrective action units (CAUs) completed (more than 250 CAUs and over 1,800 corrective action sites), it was determined that an activity closeout process should be implemented to ensure that the work completed over the past 15 years is well documented in a comprehensive and concise summary. While the process used to close each individual CAU is described in approved documents, no single document describes in summary fashion the work completed to close the many individual Industrial Sites. The activity closeout process will be used to develop an Industrial Sites closeout document that describes these years of work. This document will summarize the number of Industrial Sites closed under the FFACO and provide general descriptions of projects, contaminants removed, and sites closed in place with corresponding Use Restrictions. Other pertinent information related to Industrial Sites work such as the project history, closure decisions, historical declarations, remediation strategies, and final CAU status will be included in the closeout document, along with a table listing each CAU and corresponding corrective action sites within each CAU. Using this process of conducting the activity closeout and developing a closeout document may prove useful for other ER projects within the DOE complex in describing how a long period of ER can be summarized in a single document. The NNSS Industrial Sites activities were completed over the span of 15 years and involved the investigation, cleanup or Use Restriction, and closure of more than 260 CAUs and over 1,800 sites. These activities will conclude in FY 2012 (with the exception of one CAU). In order to capture the work completed over this length of time and document decisions made during the activities, a closeout effort was initiated. The closeout will review the work conducted during the Industrial Sites activities and produce a single document that summarizes Industrial Sites activities. This closeout is being conducted at an interim stage in the overall NNSA/NSO ER Project since the Soils and UGTA activities will continue for a number of years, but the completion of the Industrial Sites project warrants conducting a closeout now while personnel are available and information is still current. The process followed by NNSA/NSO in conducing project closeout for the Industrial Sites portion of the ER program may prove useful within the DOE complex in demonstrating how a large ER project can be summarized. (authors)« less

  20. A Complex Approach to UXO Discrimination: Combining Advanced EMI Forward Models and Statistical Signal Processing

    DTIC Science & Technology

    2012-01-01

    discrimination at live-UXO sites. Namely, under this project first we developed and implemented advanced, physically complete forward EMI models such as, the...detection and discrimination at live-UXO sites. Namely, under this project first we developed and implemented advanced, physically complete forward EMI...Shubitidze of Sky Research and Dartmouth College, conceived, implemented , and tested most of the approaches presented in this report. He developed

  1. Statistical Methods and Tools for Uxo Characterization (SERDP Final Technical Report)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pulsipher, Brent A.; Gilbert, Richard O.; Wilson, John E.

    2004-11-15

    The Strategic Environmental Research and Development Program (SERDP) issued a statement of need for FY01 titled Statistical Sampling for Unexploded Ordnance (UXO) Site Characterization that solicited proposals to develop statistically valid sampling protocols for cost-effective, practical, and reliable investigation of sites contaminated with UXO; protocols that could be validated through subsequent field demonstrations. The SERDP goal was the development of a sampling strategy for which a fraction of the site is initially surveyed by geophysical detectors to confidently identify clean areas and subsections (target areas, TAs) that had elevated densities of anomalous geophysical detector readings that could indicate the presencemore » of UXO. More detailed surveys could then be conducted to search the identified TAs for UXO. SERDP funded three projects: those proposed by the Pacific Northwest National Laboratory (PNNL) (SERDP Project No. UXO 1199), Sandia National Laboratory (SNL), and Oak Ridge National Laboratory (ORNL). The projects were closely coordinated to minimize duplication of effort and facilitate use of shared algorithms where feasible. This final report for PNNL Project 1199 describes the methods developed by PNNL to address SERDP's statement-of-need for the development of statistically-based geophysical survey methods for sites where 100% surveys are unattainable or cost prohibitive.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bauer, Stephen J.

    The elevation change data measured at the Bryan Mound Strategic Petroleum Reserve (SPR) site over the last 16+ years has been studied and a model utilized to project elevation changes into the future. The subsidence rate at Bryan Mound is low in comparison with other Strategic Petroleum Reserve sites and has decreased with time due to the maintenance of higher operating pressures and the normal decrease in creep closure rate of caverns with time. However, the subsidence at the site is projected to continue. A model was developed to project subsidence values 20 years into the future; no subsidence relatedmore » issues are apparent from these projections.« less

  3. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less

  4. Nurses' perceptions of involvement in Thunder Project. American Association of Critical-Care Nurses Thunder Project task force.

    PubMed

    1995-03-01

    The American Association of Critical-Care Nurse's (AACN) Thunder Project was conceptualized and developed to provide critical-care nurses with a research protocol ready for institutional review and implementation. Project goals included providing a research package (protocol, educational, and data collection materials) and a topic of clinical significance to critical-care nurses. Site coordinators and research associates were identified at participating institutions to coordinate and implement all study activities. In this article, an evaluation study undertaken to recount perceptions of site coordinators and research associates in relation to project goals and research experience is described. Data demonstrated that study goals were achieved, and research experience was considered professionally enhancing. Written comments described barriers to project implementation at participating sites. Obtaining informed consent and physician approval and/or cooperation were identified as significant barriers to implementation at some sites.

  5. Climate Change Projection for the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.

    2014-12-01

    As per recent Department of Energy (DOE) sustainability requirements, the Savannah River National Laboratory (SRNL) is developing a climate projection for the DOE's Savannah River Site (SRS) near Aiken, SC. This will comprise data from both a statistical and a dynamic downscaling process, each interpolated to the SRS. We require variables most relevant to operational activities at the site (such as the US Forest Service's forest management program), and select temperature, precipitation, wind, and humidity as being most relevant to energy and water resource requirements, fire and forest ecology, and facility and worker safety. We then develop projections of the means and extremes of these variables, estimate the effect on site operations, and develop long-term mitigation strategies. For example, given that outdoor work while wearing protective gear is a daily facet of site operations, heat stress is of primary importance to work planning, and we use the downscaled data to estimate changes in the occurrence of high temperatures. For the statistical downscaling, we use global climate model (GCM) data from the Climate Model Intercomparison Project, version 5 (CMIP-5), which was used in the IPCC Fifth Assessment Report (AR5). GCM data from five research groups was selected, and two climate change scenarios - RCP 4.5 and RCP 8.5 - are used with observed data from site instruments and other databases to produce the downscaled projections. We apply a quantile regression downscaling method, which involves the use of the observed cumulative distribution function to correct that of the GCM. This produces a downscaled projection with an interannual variability closer to that of the observed data and allows for more extreme values in the projections, which are often absent in GCM data. The statistically downscaled data is complemented with dynamically downscaled data from the NARCCAP database, which comprises output from regional climate models forced with GCM output from the CMIP-3 database of GCM simulations. Applications of the downscaled climate projections to some of the unique operational needs of a large DOE weapons complex site are described.

  6. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holst, Kent; Huff, Georgianne; Schulte, Robert H.

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issuesmore » related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.« less

  7. Project Development Model | Integrated Energy Solutions | NREL

    Science.gov Websites

    . The five elements of project fundamentals are: Baseline: Analyze the current situation for the site . The two-phase iterative model includes elements in project fundamentals and project development based State and Local Energy Data (SLED) tool, developed by NREL for the U.S. Department of Energy, to get

  8. Orientations for the Teaching of Writing: A Legacy of the National Writing Project

    ERIC Educational Resources Information Center

    Whitney, Anne Elrod; Friedrich, Linda

    2013-01-01

    Background/Context: Founded in 1974 by James Gray and a group of teacher colleagues who came together as the Bay Area Writing Project in California, the National Writing Project is a professional development network that has spread from one site to 197 university-based sites across the U.S. After such a long period of time in operation, it becomes…

  9. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig

    2013-07-01

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysicsmore » and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)« less

  10. Insights on WWW-based geoscience teaching: Climbing the first year learning cliff

    NASA Astrophysics Data System (ADS)

    Lamberson, Michelle N.; Johnson, Mark; Bevier, Mary Lou; Russell, J. Kelly

    1997-06-01

    In early 1995, The University of British Columbia Department of Geological Sciences (now Earth and Ocean Sciences) initiated a project that explored the effectiveness of the World Wide Web as a teaching and learning medium. Four decisions made at the onset of the project have guided the department's educational technology plan: (1) over 90% of funding recieved from educational technology grants was committed towards personnel; (2) materials developed are modular in design; (3) a data-base approach was taken to resource development; and (4) a strong commitment to student involvement in courseware development. The project comprised development of a web site for an existing core course: Geology 202, Introduction to Petrology. The web site is a gateway to course information, content, resources, exercises, and several searchable data-bases (images, petrologic definitions, and minerals in thin section). Material was developed on either an IBM or UNIX machine, ported to a UNIX platform, and is accessed using the Netscape browser. The resources consist primarily of HTML files or CGI scripts with associated text, images, sound, digital movies, and animations. Students access the web site from the departmental student computer facility, from home or a computer station in the petrology laboratory. Results of a survey of the Geol 202 students indicate that they found the majority of the resources useful, and the site is being expanded. The Geology 202 project had a "trickle-up" effect throughout the department: prior to this project, there was minimal use of Internet resources in lower-level geology courses. By the end of the 1996-1997 academic year, we anticipate that at least 17 Earth and Ocean Science courses will have a WWW site for one or all of the following uses: (1) presenting basic information; (2) accessing lecture images; (3) providing a jumping-off point for exploring related WWW sites; (4) conducting on-line exercises; and/or (5) providing a communications forum for students and faculty via a Hypernews group. Url http://www.science.ubc.ca/

  11. Wind Powering America State Outreach. Final Technical Report: Washington State

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stearns, Tim

    2013-09-30

    The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less

  12. A Handbook of the Job-Site English Project 1985-86.

    ERIC Educational Resources Information Center

    Acevedo, Sheila; Dovel, Frankie

    The Orange County Public Schools' Job Site English Project was initiated to provide employees of businesses and industries with work-related English for speakers of other languages. The program features individualized curricula that are developed after the curriculum writer visits the business/industry in need of services, analyzes the…

  13. Naval Medical Research and Development News. Volume 7, Issue 10

    DTIC Science & Technology

    2015-10-01

    SR) product against adult Aedes aegypti the primary vector for DENV. The goal of this project is to obtain evidence that SRs lessen contact between...multi-site project designated to test the SR against the dengue vector Aedes aegypti. Four other sites will evaluate its impact against malarial

  14. Review and Implementation of Technology for Solid Radioactive Waste Volume Reduction

    DTIC Science & Technology

    1999-10-15

    were shifted to Project 1.1 for spent nuclear fuel cask development to accelerate that project. Those funds should be repaid to Project 1.3 in the... transported between the shipyards such as Nerpa, and other intermediate storage sites such as Gremikha and Andreeva Bay. At these sites the largest...waste source and allow pretreatment unit operations using commercially available technologies of contaminant assaying, cutting/shearing, sorting

  15. Survey of existing underground openings for in-situ experimental facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wollenberg, H.; Graf, A.; Strisower, B.

    1981-07-01

    In an earlier project, a literature search identified 60 underground openings in crystalline rock capable of providing access for an in-situ experimental facility to develop geochemical and hydrological techniques for evaluating sites for radioactive waste isolation. As part of the current project, discussions with state geologists, owners, and operators narrowed the original group to 14. Three additional sites in volcanic rock and one site in granite were also identified. Site visits and application of technical criteria, including the geologic and hydrologic settings and depth, extent of the rock unit, condition, and accessibility of underground workings, determined four primary candidate sites:more » the Helms Pumped Storage Project in grandiodorite of the Sierra Nevada, California; the Tungsten Queen Mine in Precambrian granodiorite of the North Carolina Piedmont; the Mount Hope Mine in Precambrian granite and gneiss of northern New Jersey; and the Minnamax Project in the Duluth gabbro complex of northern Minnesota.« less

  16. Planning riparian restoration in the context of tamarix control in Western North America

    USGS Publications Warehouse

    Shafroth, P.B.; Beauchamp, Vanessa B.; Briggs, M.K.; Lair, K.; Scott, M.L.; Sher, A.A.

    2008-01-01

    Throughout the world, the condition of many riparian ecosystems has declined due to numerous factors, including encroachment of non-native species. In the western United States, millions of dollars are spent annually to control invasions of Tamarix spp., introduced small trees or shrubs from Eurasia that have colonized bottomland ecosystems along many rivers. Resource managers seek to control Tamarix in attempts to meet various objectives, such as increasing water yield and improving wildlife habitat. Often, riparian restoration is an implicit goal, but there has been little emphasis on a process or principles to effectively plan restoration activities, and many Tamarix removal projects are unsuccessful at restoring native vegetation. We propose and summarize the key steps in a planning process aimed at developing effective restoration projects in Tamarix-dominated areas. We discuss in greater detail the biotic and abiotic factors central to the evaluation of potential restoration sites and summarize information about plant communities likely to replace Tamarix under various conditions. Although many projects begin with implementation, which includes the actual removal of Tamarix, we stress the importance of pre-project planning that includes: (1) clearly identifying project goals; (2) developing realistic project objectives based on a detailed evaluation of site conditions; (3) prioritizing and selecting Tamarix control sites with the best chance of ecological recovery; and (4) developing a detailed tactical plan before Tamarix is removed. After removal, monitoring and maintenance as part of an adaptive management approach are crucial for evaluating project success and determining the most effective methods for restoring these challenging sites. ?? 2008 Society for Ecological Restoration International.

  17. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less

  18. The Road to Tomorrow's Teachers: Planning, Implementing, and Evaluating a State-Based Special Education Workforce Development Initiative. Lessons Learned from the National Pilot Sites Project for Recruitment and Retention. Developing the Special Education Workforce.

    ERIC Educational Resources Information Center

    National Clearinghouse for Professions in Special Education, Arlington, VA.

    This document describes the National Pilot Sites Project for Recruitment and Retention, an effort to recruit, prepare, and retain highly qualified diverse educators and related services personnel for children and youth with disabilities by involving multiple stakeholder groups within selected states (Alabama, Colorado, Georgia, New Jersey, Oregon,…

  19. Virtual Heritage Tours: Developing Interactive Narrative-Based Environments for Historical Sites

    NASA Astrophysics Data System (ADS)

    Tuck, Deborah; Kuksa, Iryna

    In the last decade there has been a noticeable growth in the use of virtual reality (VR) technologies for reconstructing cultural heritage sites. However, many of these virtual reconstructions evidence little of sites' social histories. Narrating the Past is a research project that aims to re-address this issue by investigating methods for embedding social histories within cultural heritage sites and by creating narrative based virtual environments (VEs) within them. The project aims to enhance the visitor's knowledge and understanding by developing a navigable 3D story space, in which participants are immersed. This has the potential to create a malleable virtual environment allowing the visitor to configure their own narrative paths.

  20. REopt Screenings Catalyze Development of Hundreds of Megawatts of Renewable Energy for Federal Agencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Federal Energy Management Program (FEMP) offers renewable energy project assistance to federal agencies, which often begins with a desktop screening to develop a prioritized portfolio of project opportunities. FEMP uses the National Renewable Energy Laboratory's REopt energy planning platform to screen potential renewable energy opportunities at a single site or across a range of sites. REopt helps organizations prioritize the most economi­cally and technically viable projects for further study and identifies the size and mix of technologies that meet the orga­nization's goals at minimum cost, along with the optimal operating strategies.

  1. Northeast Oregon Hatchery Project, Final Siting Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less

  2. Overview of DOE Oil and Gas Field Laboratory Projects

    NASA Astrophysics Data System (ADS)

    Bromhal, G.; Ciferno, J.; Covatch, G.; Folio, E.; Melchert, E.; Ogunsola, O.; Renk, J., III; Vagnetti, R.

    2017-12-01

    America's abundant unconventional oil and natural gas (UOG) resources are critical components of our nation's energy portfolio. These resources need to be prudently developed to derive maximum benefits. In spite of the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells is not known. In addition, there is the dire need of a comprehensive understanding of ways to improve the recovery of shale gas with little or no impacts on the environment. Research that seeks to expand our view of effective and environmentally sustainable ways to develop our nation's oil and natural gas resources can be done in the laboratory or at a computer; but, some experiments must be performed in a field setting. The Department of Energy (DOE) Field Lab Observatory projects are designed to address those research questions that must be studied in the field. The Department of Energy (DOE) is developing a suite of "field laboratory" test sites to carry out collaborative research that will help find ways of improving the recovery of energy resources as much as possible, with as little environmental impact as possible, from "unconventional" formations, such as shale and other low permeability rock formations. Currently there are three field laboratories in various stages of development and operation. Work is on-going at two of the sites: The Hydraulic Fracturing Test Site (HFTS) in the Permian Basin and the Marcellus Shale Energy and Environmental Lab (MSEEL) project in the Marcellus Shale Play. Agreement on the third site, the Utica Shale Energy and Environmental Lab (USEEL) project in the Utica Shale Play, was just recently finalized. Other field site opportunities may be forthcoming. This presentation will give an overview of the three field laboratory projects.

  3. [On-site quality control of acupuncture randomized controlled trial: design of content and checklist of quality control based on PICOST].

    PubMed

    Li, Hong-Jiao; He, Li-Yun; Liu, Zhi-Shun; Sun, Ya-Nan; Yan, Shi-Yan; Liu, Jia; Zhao, Ye; Liu, Bao-Yan

    2014-02-01

    To effectively guarantee quality of randomized controlld trial (RCT) of acupuncture and develop reasonable content and checklist of on-site quality control, influencing factors on quality of acupuncture RCT are analyzed and scientificity of quality control content and feasibility of on-site manipulation are put into overall consideration. Based on content and checklist of on-site quality control in National 11th Five-Year Plan Project Optimization of Comprehensive Treatment Plan for TCM in Prevention and Treatment of Serious Disease and Clinical Assessment on Generic Technology and Quality Control Research, it is proposed that on-site quality control of acupuncture RCT should be conducted with PICOST (patient, intervention, comparison, out come, site and time) as core, especially on quality control of interveners' skills and outcome assessment of blinding, and checklist of on-site quality control is developed to provide references for undertaking groups of the project.

  4. A Virtual Collaborative Environment for Mars Surveyor Landing Site Studies

    NASA Technical Reports Server (NTRS)

    Gulick, V.C.; Deardorff, D. G.; Briggs, G. A.; Hand, K. P.; Sandstrom, T. A.

    1999-01-01

    Over the past year and a half, the Center for Mars Exploration (CMEX) at NASA Ames Research Center (ARC) has been working with the Mars Surveyor Project Office at JPL to promote interactions among the planetary community and to coordinate landing site activities for the Mars Surveyor Project Office. To date, CMEX has been responsible for organizing the first two Mars Surveyor Landing Site workshops, web-archiving resulting information from these workshops, aiding in science evaluations of candidate landing sites, and serving as a liaison between the community and the Project. Most recently, CMEX has also been working with information technologists at Ames to develop a state-of-the-art collaborative web site environment to foster interaction of interested members of the planetary community with the Mars Surveyor Program and the Project Office. The web site will continue to evolve over the next several years as new tools and features are added to support the ongoing Mars Surveyor missions.

  5. Quarterly report for the NGA FFCA project, July 1--September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-31

    Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributedmore » for review and comment.« less

  6. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less

  7. Migrant Education Administrative Guide.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of Compensatory Education.

    Relating specifically to the North Carolina migrant education program's administrative responsibilities, this guide is designed to aid administrators in program management, monitoring project activities, project evaluation, self-assessment, determining needs for training and staff development, site-visit preparation, policy development, and…

  8. NASA Remediation Technology Collaboration Development Task, Overview and Project Summaries

    NASA Technical Reports Server (NTRS)

    Romeo, James G.

    2014-01-01

    An overview presentation of NASA's Remediation Technology Collaboration Development Task including the following project summaries: in situ groundwater monitor, in situ chemical oxidation, in situ bioremediation, horizontal multi-port well, and high resolution site characterization.

  9. Educational Program Development for the Rural Disadvantaged. Research Report.

    ERIC Educational Resources Information Center

    Thomas, Hollie B.; And Others

    As part of a far-reaching research project on educational needs of the rural disadvantaged, this phase of the Rural Education Disadvantaged Youth Project (Project REDY) dealt with the development and evaluation of a vocationally-oriented family-centered educational program. The model program, which was field-tested at a single site, focused upon:…

  10. Craney Island Disposal Area: Updated Projections for Filling Rates through 1989

    DTIC Science & Technology

    1992-08-01

    2,500-acre confined dredged material disposal facility located near Norfolk, VA. In 1981, the Cwaney Island Management Plan ( CIMP ) was developed to extend...the useful life of the site for disposal of maintenance material from the project area. The CIMP called for subdivision of the site into three...subcontainments and use of alternating filling and dewatering cycles. Management of the site in general accordance with the CIMP was implemented in 1984

  11. 13 CFR 305.12 - Project sign.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 13 Business Credit and Assistance 1 2013-01-01 2013-01-01 false Project sign. 305.12 Section 305... WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the construction period of a sign or signs at a conspicuous place at the Project site indicating that...

  12. 13 CFR 305.12 - Project sign.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 13 Business Credit and Assistance 1 2014-01-01 2014-01-01 false Project sign. 305.12 Section 305... WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the construction period of a sign or signs at a conspicuous place at the Project site indicating that...

  13. 13 CFR 305.12 - Project sign.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Project sign. 305.12 Section 305... WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the construction period of a sign or signs at a conspicuous place at the Project site indicating that...

  14. The Chicago Center for Green Technology: life-cycle assessment of a brownfield redevelopment project

    NASA Astrophysics Data System (ADS)

    Brecheisen, Thomas; Theis, Thomas

    2013-03-01

    The sustainable development of brownfields reflects a fundamental, yet logical, shift in thinking and policymaking regarding pollution prevention. Life-cycle assessment (LCA) is a tool that can be used to assist in determining the conformity of brownfield development projects to the sustainability paradigm. LCA was applied to the process of a real brownfield redevelopment project, now known as the Chicago Center for Green Technology, to determine the cumulative energy required to complete the following redevelopment stages: (1) brownfield assessment and remediation, (2) building rehabilitation and site development and (3) ten years of operation. The results of the LCA have shown that operational energy is the dominant life-cycle stage after ten years of operation. The preservation and rehabilitation of the existing building, the installation of renewable energy systems (geothermal and photovoltaic) on-site and the use of more sustainable building products resulted in 72 terajoules (TJ) of avoided energy impacts, which would provide 14 years of operational energy for the site. Methodological note: data for this life-cycle assessment were obtained from project reports, construction blueprints and utility bills.

  15. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  16. The Interdisciplinary Generalist Curriculum Project: A National Medical School Demonstration Project.

    ERIC Educational Resources Information Center

    Kahn, Norman B., Jr.; And Others

    1995-01-01

    The Interdisciplinary Generalist Curriculum Project was developed to encourage schools of medicine and colleges of osteopathic medicine to implement interdisciplinary generalist curricula in the preclinical years. Five sites were competitively established as demonstration projects, and rigorous attention to creating and maintaining an…

  17. Hualapai Wind Project Feasibility Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Kevin; Randall, Mark; Isham, Tom

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less

  18. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, Will

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less

  19. Integration of Fish and Wildlife Data with Geobased and Remotely Sensed Land Use/land Cover Data: a Demonstration Using Sites in Pennsylvania. [Berwick and Lancaster

    NASA Technical Reports Server (NTRS)

    Cushwa, C. T.; Laroche, G.; Dubrock, C. W.

    1982-01-01

    The U.S. Fish and Wildlife Service developed a statewide fish and wildlife data base for the Pennsylvania Game Commission that includes 125 categories of information on each of the 844 species. This species data base is integrated with geobased and remotely-sensed land use/land cover data from two sites in Pennsylvania. One site is an energy development project; the other is a high-energy use area. Analyses using the combined animal and land use data bases can be demonstrated for a variety of land use/land cover types at both sites. The ability to make "what if" analysis prior to project implementation is presented.

  20. Supporting On-Site Teacher-Consultants: New York City Writing Project's Community of Learners

    ERIC Educational Resources Information Center

    Osterman, Ed

    2008-01-01

    This monograph describes and analyzes the particular processes and structures that the New York City Writing Project (NYCWP) directors and on-site teacher-consultants have developed that enable them to support and learn from each other and to reflect critically upon the work they do with teachers, students, and administrators. Over time the…

  1. U.S. Department of Energy's site screening, site selection, and initial characterization for storage of CO2 in deep geological formations

    USGS Publications Warehouse

    Rodosta, T.D.; Litynski, J.T.; Plasynski, S.I.; Hickman, S.; Frailey, S.; Myer, L.

    2011-01-01

    The U.S. Department of Energy (DOE) is the lead Federal agency for the development and deployment of carbon sequestration technologies. As part of its mission to facilitate technology transfer and develop guidelines from lessons learned, DOE is developing a series of best practice manuals (BPMs) for carbon capture and storage (CCS). The "Site Screening, Site Selection, and Initial Characterization for Storage of CO2 in Deep Geological Formations" BPM is a compilation of best practices and includes flowchart diagrams illustrating the general decision making process for Site Screening, Site Selection, and Initial Characterization. The BPM integrates the knowledge gained from various programmatic efforts, with particular emphasis on the Characterization Phase through pilot-scale CO2 injection testing of the Validation Phase of the Regional Carbon Sequestration Partnership (RCSP) Initiative. Key geologic and surface elements that suitable candidate storage sites should possess are identified, along with example Site Screening, Site Selection, and Initial Characterization protocols for large-scale geologic storage projects located across diverse geologic and regional settings. This manual has been written as a working document, establishing a framework and methodology for proper site selection for CO2 geologic storage. This will be useful for future CO2 emitters, transporters, and storage providers. It will also be of use in informing local, regional, state, and national governmental agencies of best practices in proper sequestration site selection. Furthermore, it will educate the inquisitive general public on options and processes for geologic CO2 storage. In addition to providing best practices, the manual presents a geologic storage resource and capacity classification system. The system provides a "standard" to communicate storage and capacity estimates, uncertainty and project development risk, data guidelines and analyses for adequate site characterization, and guidelines for reporting estimates within the classification based on each project's status. 

  2. National Stormwater Calculator: Low Impact Development ...

    EPA Pesticide Factsheets

    The National Stormwater Calculator (NSC) makes it easy to estimate runoff reduction when planning a new development or redevelopment site with low impact development (LID) stormwater controls. The Calculator is currently deployed as a Windows desktop application. The Calculator is organized as a wizard style application that walks the user through the steps necessary to perform runoff calculations on a single urban sub-catchment of 10 acres or less in size. Using an interactive map, the user can select the sub-catchment location and the Calculator automatically acquires hydrologic data for the site.A new LID cost estimation module has been developed for the Calculator. This project involved programming cost curves into the existing Calculator desktop application. The integration of cost components of LID controls into the Calculator increases functionality and will promote greater use of the Calculator as a stormwater management and evaluation tool. The addition of the cost estimation module allows planners and managers to evaluate LID controls based on comparison of project cost estimates and predicted LID control performance. Cost estimation is accomplished based on user-identified size (or auto-sizing based on achieving volume control or treatment of a defined design storm), configuration of the LID control infrastructure, and other key project and site-specific variables, including whether the project is being applied as part of new development or redevelopm

  3. Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates

    NASA Astrophysics Data System (ADS)

    Cianfrani, C. M.

    2009-12-01

    Teaching Sustainable Water Resources and Low Impact Development: A Project Centered Course for First-Year Undergraduates Christina M. Cianfrani Assistant Professor, School of Natural Science, Hampshire College, 893 West Avenue, Amherst, MA 01002 Sustainable water resources and low impact development principles are taught to first-year undergraduate students using an applied design project sited on campus. All students at Hampshire College are required to take at least one natural science course during their first year as part of their liberal arts education. This requirement is often met with resistance from non-science students. However, ‘sustainability’ has shown to be a popular topic on campus and ‘Sustainable Water Resources’ typically attracts ~25 students (a large class size for Hampshire College). Five second- or third-year students are accepted in the class as advanced students and serve as project leaders. The first-year students often enter the class with only basic high school science background. The class begins with an introduction to global water resources issues to provide a broad perspective. The students then analyze water budgets, both on a watershed basis and a personal daily-use basis. The students form groups of 4 to complete their semester project. Lectures on low impact design principles are combined with group work sessions for the second half of the semester. Students tour the physical site located across the street from campus and begin their project with a site analysis including soils, landcover and topography. They then develop a building plan and identify preventative and mitigative measures for dealing with stormwater. Each group completes TR-55 stormwater calculations for their design (pre- and post-development) to show the state regulations for quantity will be met with their design. Finally, they present their projects to the class and prepare a formal written report. The students have produced a wide variety of creative, mostly practical designs. Student feedback about the course has included high praise for the applied nature of the project as well as the use of advanced students to lead the groups and help provide guidance throughout the project. Example of low impact development using clustered housing, rain gardens (small dots), green roofs (circles on house sites), vegetated swales along roadways, infiltration area, and a reforested buffer (along right edge).

  4. Recent Developments in Cultural Heritage Image Databases: Directions for User-Centered Design.

    ERIC Educational Resources Information Center

    Stephenson, Christie

    1999-01-01

    Examines the Museum Educational Site Licensing (MESL) Project--a cooperative project between seven cultural heritage repositories and seven universities--as well as other developments of cultural heritage image databases for academic use. Reviews recent literature on image indexing and retrieval, interface design, and tool development, urging a…

  5. Monitored natural attenuation of chlorinated solvents—Moving beyond reductive dechlorination

    USGS Publications Warehouse

    Vangelas, Karen M.; Looney, Brian B.; Early, Tom O.; Gilmore, Tyler; Chapelle, Francis H.; Adams, Karen M.; Sink, Claire H.

    2006-01-01

    Monitored natural attenuation (MNA), while a remedy of choice for many sites, can be challenging when the contaminants are chlorinated solvents. Even with many high-quality technical guidance references available, there continue to be challenges implementing MNA at some chlorinated solvent sites. The U.S. Department of Energy, as one organization facing such challenges, is leading a project that will incorporate developing concepts and tools into the existing toolbox for selecting and implementing MNA as a remediation option at sites with chlorinated solvent contamination. The structure and goals of this project were introduced in an article in the Winter 2004 issue of Remediation (Sink et al., 2004). This article is a summary of the three technical areas being developed through the project: mass balance, enhanced attenuation, and characterization and monitoring supporting the first two areas.

  6. 7 CFR 4279.261 - Application for loan guarantee content.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... project; (2) The viability of such technology for the particular project application; (3) The development... location, size, etc.). Economic feasibility determination. Market feasibility determination. Technical.... Recommendations for implementation. (B) Economic Feasibility: Information regarding project site; Availability of...

  7. Evaluation of Free To Grow, Phase II: Detailed Profile of the Free To Grow Project in California. Final Report.

    ERIC Educational Resources Information Center

    Harrington, Mary

    The Free to Grow pilot project, developed by the Charles R. Drew University of Medicine and Science and its Head Start project, operated between 1994 and 1999. Following a 2-year planning and development stage, 5 project sites went on to complete the 3-year implementation phase in California, Colorado, Kentucky, New York, and Puerto Rico; the…

  8. SITEX 2.0: Projections of protein functional sites on eukaryotic genes. Extension with orthologous genes.

    PubMed

    Medvedeva, Irina V; Demenkov, Pavel S; Ivanisenko, Vladimir A

    2017-04-01

    Functional sites define the diversity of protein functions and are the central object of research of the structural and functional organization of proteins. The mechanisms underlying protein functional sites emergence and their variability during evolution are distinguished by duplication, shuffling, insertion and deletion of the exons in genes. The study of the correlation between a site structure and exon structure serves as the basis for the in-depth understanding of sites organization. In this regard, the development of programming resources that allow the realization of the mutual projection of exon structure of genes and primary and tertiary structures of encoded proteins is still the actual problem. Previously, we developed the SitEx system that provides information about protein and gene sequences with mapped exon borders and protein functional sites amino acid positions. The database included information on proteins with known 3D structure. However, data with respect to orthologs was not available. Therefore, we added the projection of sites positions to the exon structures of orthologs in SitEx 2.0. We implemented a search through database using site conservation variability and site discontinuity through exon structure. Inclusion of the information on orthologs allowed to expand the possibilities of SitEx usage for solving problems regarding the analysis of the structural and functional organization of proteins. Database URL: http://www-bionet.sscc.ru/sitex/ .

  9. WVU Hydrogen Fuel Dispensing Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, William

    2015-09-01

    The scope of this project was changed during the course of the project. Phase I of the project was to construct a site similar to the site at Central West Virginia Regional Airport in Charleston, WV to show that duplication of the site was a feasible method of conducting hydrogen stations. Phase II of the project was necessitated due to a lack of funding that was planned for the development of the station in Morgantown. The US Department of Energy determined that the station in Charleston would be dismantled and moved to Morgantown and reassembled at the Morgantown site. Thismore » necessitated storage of the components of the station for almost a year at the NAFTC Headquarters which caused a number of issues with the equipment that will be discussed in later portions of this report. This report will consist of PHASE I and PHASE II with discussions on each of the tasks scheduled for each phase of the project.« less

  10. Rural Palliative Care in North India: Rapid Evaluation of a Program Using a Realist Mixed Method Approach.

    PubMed

    Munday, Daniel F; Haraldsdottir, Erna; Manak, Manju; Thyle, Ann; Ratcliff, Cathy M

    2018-01-01

    Palliative care has not developed widely in rural North India. Since 2010, the Emmanuel Hospitals Association (EHA) has been developing a model of palliative care appropriate for this setting, based on teams undertaking home visits with the backup of outpatient and inpatient services. A project to further develop the model operated from 2012 to 2015 supported by funding from the UK. This study aims to evaluate the EHA palliative care project. Rapid evaluation method using a mixed method realist approach at the five project hospital sites. An overview of the project was obtained by analyzing project documents and key informant interviews. Questionnaire data from each hospital were collected, followed by interviews with staff, patients, and relatives and observations of home visits and other activities at each site. Descriptive analysis of quantitative and thematic analysis of qualitative data was undertaken. Each site was measured against the Indian Minimum Standards Tool for Palliative Care (IMSTPC). Each team followed the EHA model, with local modifications. Services were nurse led with medical support. Eighty percent of patients had cancer. Staff demonstrated good palliative care skills and patients and families appreciated the care. Most essential IMSTPC markers were achieved but morphine licenses were available to only two teams. Remarkable synergy was emerging between palliative care and community health. Hospitals planned to fund palliative care through income from surgical services. Excellent palliative care appropriate for rural north India is delivered through the EHA model. It could be extended to other similar sites.

  11. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume I. Project conceptual design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) Project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The Project conceptual design is presented in this volume.« less

  12. Development of a requirements management system for technical decision - making processes in the geological disposal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama

    2007-07-01

    NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less

  13. Summary of Carbon Storage Incentives and Potential Legislation: East Sub-Basin Project Task 3.1 Business and Financial Case Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabucchi, Chiara

    The CarbonSAFE Illinois – East Sub-Basin project is conducting a pre-feasibility assessment for commercial-scale CO2 geological storage complexes. The project aims to identify sites capable of storing more than 50 million tons of industrially-sourced CO2. To support the business development assessment of the economic viability of potential sites in the East Sub-Basin and explore conditions under which a carbon capture and storage (CCS) project therein might be revenue positive, this document provides a summary of carbon storage incentives and legislation of potential relevance to the project.

  14. RESULTS OF THE ENVIRONMENTAL MANAGEMENT (EM) CORPORATE PROJECT TEAM DISPOSING WASTE & REDUCING RISK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SHRADER, T.A.; KNERR, R.

    2005-01-31

    In 2002, the US Department of Energy's (DOE) Office of Environmental Management (EM) released the Top-To-Bottom Review of cognizant clean-up activities around the DOE Complex. The review contained a number of recommendations for changing the way EM operates in order to reduce environmental risk by significantly accelerating clean-up at the DOE-EM sites. In order to develop and implement these recommendations, a number of corporate project teams were formed to identify, evaluate, and initiate implementation of alternatives for the different aspects of clean-up. In August 2002, a corporate team was formed to review all aspects of the management, treatment, and disposalmore » of low level radioactive waste (LLW), mixed low level radioactive waste (MLLW), transuranic waste (TRU), and hazardous waste (HW). Over the next 21 months, the Corporate Project Team: Disposing Waste, Reducing Risk, developed a number of alternatives for implementing the recommendations of the Top-To-Bottom Review based on information developed during numerous site visits and interviews with complex and industry personnel. With input from over a dozen EM sites at various stages of clean-up, the team identified the barriers to the treatment and disposal of low level waste, mixed low level waste, and transuranic waste. Once identified, preliminary design alternatives were developed and presented to the Acquisition Authority (for this project, the Assistant Secretary for Environmental Management) for review and approval. Once the preliminary design was approved, the team down selected to seven key alternatives which were subsequently fully developed in the Project Execution Plan. The seven most viable alternatives were: (1) creation of an Executive Waste Disposal Board; (2) projectizing the disposal of low level waste and mixed low level waste; (3) creation of a National Consolidation and Acceleration Facility for waste; (4) improvements to the Broad Spectrum contract; (5) improvements to the Toxic Substance Control Act (TSCA) Incinerator contract and operations; (6) development of a policy for load management of waste shipments to the Waste Isolation Pilot Plant (WIPP); and (7) development of a complex-wide fee incentive for transuranic waste disposal. The alternatives were further refined and a plan developed for institutionalizing the alternatives in various site contracts. In order to focus the team's efforts, all team activities were conducted per the principles of DOE Order 413.3, Program and Project Management for the Acquisition of Capital Assets. Although the Order was developed for construction projects, the principles were adapted for use on this ''soft'' project in which the deliverables were alternatives for the way work was performed. The results of the team's investigation and the steps taken during the project are presented along with lessons learned.« less

  15. Nevada National Security Site: Site-Directed Research and Development (SDRD) Fiscal Year 2015 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bender, Howard A.

    This report presents results of multiple research projects, new and ongoing, funded under the Site-Directed Research and Development Program for the Nevada National Security Site during federal fiscal year 2015. The Site's legacy capabilities in remote sensing combined with new paradigms for emergency response and consequence management help drive the need to develop advanced aerial sensor platforms. Likewise, dynamic materials science is a critical area of scientific research for which basic physics issues are still unresolved. New methods of characterizing materials in extreme states are vitally needed, and these efforts are paving the way with new knowledge. Projects selected inmore » FY 2015 for the Exploratory Research portfolio exhibit a strong balance of NNSS mission relevance. Geoscience, seismology, and techniques for detecting underground nuclear events are still essential focus areas. Many of the project reports in the second major section of this annual report are ongoing continuations in multi-year lifecycles. Diagnostic techniques for stockpile and nuclear security science figured prominently as well, with a few key efforts coming to fruition, such as phase transition detection. In other areas, modeling efforts toward better understanding plasma focus physics has also started to pay dividends for major program needs.« less

  16. Kinetic Rate Kernels via Hierarchical Liouville-Space Projection Operator Approach.

    PubMed

    Zhang, Hou-Dao; Yan, YiJing

    2016-05-19

    Kinetic rate kernels in general multisite systems are formulated on the basis of a nonperturbative quantum dissipation theory, the hierarchical equations of motion (HEOM) formalism, together with the Nakajima-Zwanzig projection operator technique. The present approach exploits the HEOM-space linear algebra. The quantum non-Markovian site-to-site transfer rate can be faithfully evaluated via projected HEOM dynamics. The developed method is exact, as evident by the comparison to the direct HEOM evaluation results on the population evolution.

  17. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  18. Statement by Dr. Raul A. Deju to the Subcommittee on Radioactive Waste, Energy and Utilities Committee, Washington State Senate, Richland, Washington, October 21, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deju, R.A.

    1982-10-01

    The Basalt Waste Isolation Project's mission is to assess whether or not a nuclear waste repository can be sited in the basalts beneath the Hanford Site. Dr. Deju summarizes the results of the siting studies, the activities connected with waste package development, and ongoing engineering studies. In addition, he gives a glimpse of past technical reviews of the project and comments on major technical activities planned in the near future.

  19. Reducing data friction through site-based data curation

    NASA Astrophysics Data System (ADS)

    Thomer, A.; Palmer, C. L.

    2017-12-01

    Much of geoscience research takes place at "scientifically significant sites": localities which have attracted a critical mass of scientific interest, and thereby merit protection by government bodies, as well as the preservation of specimen and data collections and the development of site-specific permitting requirements for access to the site and its associated collections. However, many data standards and knowledge organization schemas do not adequately describe key characteristics of the sites, despite their centrality to research projects. Through work conducted as part of the IMLS-funded Site-Based Data Curation (SBDC) project, we developed a Minimum Information Framework (MIF) for site-based science, in which "information about a site's structure" is considered a core class of information. Here we present our empirically-derived information framework, as well as the methods used to create it. We believe these approaches will lead to the development of more effective data repositories and tools, and thereby will reduce "data friction" in interdisciplinary, yet site-based, geoscience workflows. The Minimum Information Framework for Site-based Research was developed through work at two scientifically significant sites: the hot springs at Yellowstone National Park, which are key to geobiology research; and the La Brea Tar Pits, an important paleontology locality in Southern California. We employed diverse methods of participatory engagement, in which key stakeholders at our sites (e.g. curators, collections managers, researchers, permit officers) were consulted through workshops, focus groups, interviews, action research methods, and collaborative information modeling and systems analysis. These participatory approaches were highly effective in fostering on-going partnership among a diverse team of domain scientists, information scientists, and software developers. The MIF developed in this work may be viewed as a "proto-standard" that can inform future repository development and data standards. Further, the approaches used to develop the MIF represent an important step toward systematic methods of developing geoscience data standards. Finally, we argue that organizing data around aspects of a site makes data collections more accessible to a range of scientific communities.

  20. Final Scientific Report - Wind Powering America State Outreach Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America Statemore » Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.« less

  1. Statewide and District Professional Development in Standards: Addressing Teacher Equity. Models of Inservice. National Writing Project at Work

    ERIC Educational Resources Information Center

    Koch, Richard; Roop, Laura; Setter, Gail

    2006-01-01

    The National Writing Project at Work (NWP) monograph series documents how the National Writing Project model is implemented and developed at local sites across the country. These monographs describe NWP work, which is often shared informally or in workshops. Richard Koch and Laura Roop present a model of standards-based professional development…

  2. Residents' Perceptions toward Utility-Scale Wind Farm Development

    ERIC Educational Resources Information Center

    Campbell, Joseph; Romich, Eric

    2015-01-01

    Increased development of wind farms in the U.S. has fostered debates surrounding the siting and support for the projects. Prior research demonstrates the importance of understanding the attitudes and opinions of community members when developing projects. This article reviews a case study of an Ohio community that integrated a local survey to…

  3. Continued development of hybrid directional boring technology and New horizontal logging development for characterization, monitoring and instrument emplacement at environmental sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wemple, R.P.; Meyer, R.D.; Jacobson, R.D.

    This work in partnership with industry is a continuation of cost- effective innovative, directional boring development begun in FY90 and planed to extend into FY94. Several demonstrations of the strategy of building hybrid hardware from utilities installation, geothermal, and soil mechanics technologies have been performed at Sandia National Laboratories (SNL) and at Charles Machine works (CMW) test sites as well as at a commercial refinery site. Additional tests at the SNL Directional Boring Test Range (DBTR) and a lagoon site are planned in calendar 1991. A new companion project to develop and demonstrate a hybrid capability for horizontal logging withmore » penetrometers, specialty instruments and samplers has been taken from concept to early prototype hardware. The project goal of extending the tracking/locating capability of the shallow boring equipment to 80in. is being pursued with encouraging results at 40in. depths. Boring costs, not including tailored well completions dictated by individual site parameters, are estimated at $20 to $50 per foot. Applications continue to emerge for this work and interest continues to be expressed by DoD and EPA researchers and environmental site engineers. 12 figs.« less

  4. Engaging Communities to Develop and Sustain Comprehensive Wellness Policies: Louisiana’s Schools Putting Prevention to Work

    PubMed Central

    Kennedy, Betty Monroe; Bourgeois, Brandi F.; Broyles, Stephanie T.; Katzmarzyk, Peter T.

    2014-01-01

    Background Tobacco use, obesity, and physical inactivity among Louisiana’s youth pose a serious public health problem. Given the potential of school environments to affect student well-being, the Louisiana Tobacco Control Program developed and tested a pilot program, Schools Putting Prevention to Work. The objective was to assist school districts in developing a comprehensive school wellness policy and engaging their school community to generate environments that support healthful choices and behaviors. Community Context The pilot was implemented in 27 school districts, reaching an estimated 325,000 people across the state. Demographics of participating students were similar to all Louisiana’s public school students. Methods A school wellness project state team advised project development. A subgroup that included contractors and partners implemented and modified the pilot. Sites were selected though an application process. Site representatives received trainings, technical assistance, and funding to organize school-based support-building activities and coordinate a school health advisory council to develop policy and sustain healthy school environments. Project sites reported progress monthly; evaluation included data from sites and project administrators. Outcome Twenty-five comprehensive school wellness policies (covering 100% tobacco-free schools and daily physical activity and healthier cafeteria items) were approved by school boards. Environmental changes such as physical activity breaks, healthier vending options, and tobacco-free campuses were adopted. Interpretation This pilot demonstrated a successful approach to achieving policy and environmental change. The state team engaged and guided school districts to motivate students, parents, faculty/staff/administration, and businesses to establish and maintain opportunities to improve lifestyle health. PMID:24602588

  5. REopt Screenings Catalyze Development of Hundreds of Megawatts of Renewable Energy for Federal Agencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) offers project assistance to federal agencies, which often begins with a desktop screening to develop a prioritized portfolio of renewable energy project opportunities. FEMP uses the National Renewable Energy Laboratory's (NREL) REopt energy planning platform to quickly and efficiently screen potential renewable energy opportunities at a single site or across a range of sites. REopt helps organizations prioritize the most economically and technically viable projects for further study, and identifies the size and mix of technologies that meet the organization's goals at minimum cost, along with the optimal operatingmore » strategies.« less

  6. Building a Co-Created Citizen Science Program with Community Members Neighboring a Hazardous Waste Site

    NASA Astrophysics Data System (ADS)

    Ramirez-Andreotta, M.; Brusseau, M. L. L.; Artiola, J. F.; Maier, R. M.; Gandolfi, A. J.

    2015-12-01

    A research project that is only expert-driven may ignore the role of local knowledge in research, often gives low priority to the development of a comprehensive strategy to engage the community, and may not deliver the results of the study to the community in an effective way. To date, only a limited number of co-created citizen science projects, where community members are involved in most or all steps of the scientific process, have been initiated at contaminated sites and even less in conjunction with risk communication. Gardenroots: The Dewey-Humboldt AZ Garden Project was a place-based, co-created citizen science project where community members and researchers together: defined the question for study, developed hypotheses, collected environmental samples, disseminated results broadly, translated the results into action, and posed new research questions. This co-created environmental research project produced new data and addressed an additional exposure route (consumption of vegetables grown in soils with elevated arsenic levels) that was not being evaluated in the current site assessment. Furthermore, co-producing science led to both individual learning and social-ecological outcomes. This approach illustrates the benefits of a co-created citizen-science program in addressing the complex problems that arise in communities neighboring a hazardous waste sites. Such a project increased the community's involvement in regional environmental assessment and decision-making, which has the potential to help mitigate environmental exposures and thereby reduce associated risks.

  7. Pyramid Lake Renewable Energy Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John Jackson

    2008-03-14

    The Pyramid Lake Paiute Tribe is a federally recognized Tribe residing on the Pyramid Lake Reservation in western Nevada. The funding for this project was used to identify blind geothermal systems disconnected from geothermal sacred sites and develop a Tribal energy corporation for evaluating potential economic development for profit.

  8. Enhancing Thinking Skills with School-University Collaboration.

    ERIC Educational Resources Information Center

    McInerney, William D.; Kolter, Gerald E.

    1988-01-01

    Describes a collaborative Purdue University and Twin Lakes School Corporation (Indiana) project to specify and demonstrate research-based instructional models facilitating the development of students' higher thinking skills. The project has developed a special site where student teachers can observe and practice teaching these skills. Includes 10…

  9. Adapting land management to emergence of novel site conditions on the continental lowlands of SE Europe

    NASA Astrophysics Data System (ADS)

    Mátyás, Csaba; Berki, Imre; Bidlo, Andras; Czimber, Kornel.; Gálos, Borbala; Gribovszki, Zoltan; Lakatos, Ferenc; Borovics, Attila; Csóka, György; Führer, Ernő; Illés, Gábor; Rasztovits, Ervin; Somogyi, Zoltán; Bartholy, Judit

    2017-04-01

    The rapid progress of site potential change, caused by the shift of climate zones is a serious problem of lowland management in Southeast Europe. In forestry, the resilience potential of main, climate-dependent tree species (e.g. spruce, beech, sessile oak) and ecosystems is limited at their lower (xeric) limits of distribution. A conventional mitigation measure for adaptive forest management is the return to nature-close management. Severe drought- and biotic impacts in forests indicate however the urgency of fundamental changes in forest policy. To provide assistance in selecting climate-tolerant provenances, species and adaptive technologies for future site conditions is therefore critical. A simplified Decision Support System has been developed for Hungary, keeping conventional elements of site potential assessment. Projections are specified for discrete site types. Processing forest inventory, landcover and geodata, the System provides GIS-supported site information and projections for individual forest compartments, options for tree species better tolerating future climate scenarios as well as their expected yield and risks. Data respectively projections are available for recent and current conditions, and for future reference periods until 2100. Also non-forest site conditions in the novel grassland (steppe) climate zone appear in projections. Experiences for proper management on these sites are however scarce.

  10. An Evaluation of Public Preferences for Superfund Site Cleanup, Volume 1: A Preliminary Assessment (1995)

    EPA Pesticide Factsheets

    The purpose of the project is to develop a methodology for determining the cleanup options for National Priority List (NPL) sites governed under Superfund legislation that are acceptable to the public. A survey instrument was developed for the study.

  11. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less

  12. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less

  13. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archivalmore » research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.« less

  14. Family Reunification Project.

    ERIC Educational Resources Information Center

    Administration for Children, Youth, and Families (DHHS), Washington, DC.

    Utah's Department of Human Services' Family Reunification Project was initiated to demonstrate that intensive, time-limited, home-based services would enable children in foster care to return to their natural families more rapidly than regular foster care management permits. The following steps were taken in project development: (1) sites were…

  15. Bringing home sustainability and climate change research and developments via on-line virtual reality

    NASA Astrophysics Data System (ADS)

    Granshaw, F. D.

    2016-12-01

    One of the key challenges of sustainability and climate education is one of accessibility. For example many of the sites where significant climate research is taking place in National Parks are largely inaccessible to the average park visitor. Likewise, taking students to visit exemplary efforts in environmentally sustainable design or habitat restoration projects may be logistically difficult or impossible for the average class. Yet despite these difficulties, finding ways to give students, park visitors, and the general public a chance to explore these areas is critical to their developing sustainability and climate literacy. To address this issue, the author has been working with National Park staff and community groups to develop desktop virtual reality environments that showcase glacier-climate research sites, developments designed with environmental sustainability in mind, and urban watersheds being rehabilitated by volunteer groups and public agencies. These environments provide the user with a chance to take a virtual walk through a site of interest, access data collected at the site, and even listen to researchers and site stewards talk about key activities taking place there. Though they are used as proxies for actual visits via independent on-line exploration, media for public talks, or the framework for student lab exercises, they these virtual environments have also been used to encourage and guide actual sites visits. A focus of this talk will be a recently launched project involving the construction of a library showcasing environmental sustainability projects in the Portland Metropolitan area. In addition to being a resource for local sustainability educators, the library will be a contribution to international sustainability education efforts as it is being developed under the umbrella of a UN affiliate (Greater Portland Sustainability Education Network).

  16. Oklahoma's Marshall Plan: Combining Professional Development and Summer Writing Camps in Low-Income Elementary Schools. National Writing Project at Work. Volume 1, Number 8

    ERIC Educational Resources Information Center

    Simmons, Eileen

    2004-01-01

    Eileen Simmons, a veteran teacher-consultant from the Oklahoma State University Writing Project, describes collaboration among writing project teacher-consultants and site-based teachers to plan professional development before, during, and after a summer writing camp for students at their school. This model, which has been adapted in a variety of…

  17. Nevada Test Site-Directed Research and Development, FY 2007 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wil Lewis, editor

    2008-02-20

    The Nevada Test Site-Directed Research and Development (SDRD) program completed a very successful year of research and development activities in FY 2007. Twenty-nine new projects were selected for funding this year, and eight projects started in FY 2006 were brought to conclusion. The total funds expended by the SDRD program were $5.67 million, for an average per-project cost of $153 thousand. An external audit conducted in September 2007 verified that appropriate accounting practices were applied to the SDRD program. Highlights for the year included: programmatic adoption of 8 SDRD-developed technologies; the filing of 9 invention disclosures for innovation evolving frommore » SDRD projects; participation in the tri-Lab Laboratory Directed Research and Development (LDRD) and SDRD Symposium that was broadly attended by Nevada Test Site (NTS), National Nuclear Security Administration (NNSA), LDRD, U.S. Department of Homeland Security (DHS), and U.S. Department of Defense (DoD) representatives; peer reviews of all FY 2007 projects; and the successful completion of 37 R&D projects, as presented in this report. In response to a company-wide call, authors throughout the NTS complex submitted 182 proposals for FY 2007 SDRD projects. The SDRD program has seen a dramatic increase in the yearly total of submitted proposals--from 69 in FY 2002 to 182 this year--while the number of projects funded has actually decreased from a program high of 57 in FY 2004. The overall effect of this trend has helped ensure an increasingly competitive program that benefited from a broader set of innovative ideas, making project selection both challenging and rewarding. Proposals were evaluated for technical merit, including such factors as innovation, probability of success, potential benefit, and mission applicability. Authors and reviewers benefited from the use of a shortfalls list entitled the 'NTS Technology Needs Assessment' that was compiled from NTS, National Weapons Laboratory (NWL), and NNSA sources. This tool continues to be of considerable value in aligning the SDRD program with mission priorities, and was expanded in FY 2007 to include technology development needs from the DHS and other agencies with missions closely aligned to that of the NTS.« less

  18. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume II. Project marketing/economic/financial/ and organization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The results of marketing, economic, and financial studies are reported in this volume.« less

  19. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume III. Project environmental/health/safety/ and socioeconomic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less

  20. Continued Development of Curriculum for Interpreter Training Programs in Vocational Education. Final Report, July 1, 1980 - June 30, 1981.

    ERIC Educational Resources Information Center

    Texas State Technical Inst., Waco.

    A project was undertaken to continue development of a curriculum for training interpreters for deaf persons enrolled in vocational education programs in Texas. Utilizing field consultants for specialized course development, project staff completed 11 interpreting modules and accompanying audiovisual prototypes. In addition, on-site visits were…

  1. Ivestigating Earth Science in Urban Schoolyards

    ERIC Educational Resources Information Center

    Endreny, Anna; Siegel, Donald I.

    2009-01-01

    The Urban Schoolyards project is a two year partnership with a university Earth Science Department and the surrounding urban elementary schools. The goal of the project was to develop the capacity of elementary teachers to teach earth science lessons using their schoolyards and local parks as field sites. The university personnel developed lessons…

  2. Hometown Newspaper Coverage of Developing Countries: Its Effects on Perceived Interdependence of Nations.

    ERIC Educational Resources Information Center

    Siltanen, Susan A.; And Others

    The "Main Street Mississippi Meets the Third World" project was designed to demonstrate that hometown newspapers can provide relevant news stories about developing countries without leaving the local community. Hattiesburg, Mississippi, and the "American" were the selected site and newspaper. The project involved working with…

  3. 41 CFR 102-71.20 - What definitions apply to GSA's real property policies?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... economic potential, qualitative values (social and environmental) inherent in the property itself, and..., and personnel employed at the site, and the requirements for preserving certain types of equipment... development projects, or for nuclear production, research, or development projects. (vi) On or used in...

  4. A Year-Round Professional Development Model for World Language Educators

    ERIC Educational Resources Information Center

    Steele, Tracy M.; Peterson, Margaret D.; Silva, Duarte M.; Padilla, Amado M.

    2009-01-01

    The Bay Area Foreign Language Program (BAFLP), one of nine regional sites of the California Foreign Language Project, offers ongoing, year-round professional development programs for world language educators. In addition, its leadership program prepares selected educators to assume leadership positions at their school sites, building capacity for…

  5. Take Off! Aeronautics and Aviation Science: Careers and Opportunities

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Funded by National Aeronautic and Space Administration's High Performance Computing and Communications/ Learning Technologies Project (HPCC/LTP) Cooperative Agreement, Aeronautics and aviation Science: Careers and Opportunities was operative from July 1995 through July 1998. This project operated as a collaboration with Massachusetts Corporation for Educational Telecommunications, the Federal Aviation Administration, Bridgewater State College and four targeted "core sites" in the greater Boston area: Dorchester, Malden, East Boston and Randolph. In its first and second years, a video series with a participatory website on aeronautics and aviation science was developed and broadcast via "live, interactive" satellite feed. Accompanying teacher and student supplementary instructional materials for grades 6-12 were produced and disseminated by the Massachusetts Corporation for Educational Telecommunications (MCET). In year three, the project team redesigned the website, edited 14 videos to a five part thematic unit, and developed a teacher's guide to the video and web materials supplement for MAC and PC platforms, aligned with national standards. In the MCET grant application it states that project Take Off! in its initial phase would recruit and train teachers at "core" sites in the greater Boston area, as well as opening participation to other on-line users of MCET's satellite feeds. "Core site" classrooms would become equipped so that teachers and students might become engaged in an interactive format which aimed at not only involving the students during the "live" broadcast of the instructional video series, but which would encourage participation in electronic information gathering and sharing among participants. As a Take Off! project goal, four schools with a higher than average proportion of minority and underrepresented youth were invited to become involved with the project to give these students the opportunity to consider career exploration and development in the field of science aviation and aeronautics. The four sites chosen to participate in this project were East Boston High School, Dorchester High School, Randolph Junior-Senior High School and Malden High School. In year 3 Dorchester was unable to continue to fully participate and exited out. Danvers was added to the "core site" list in year 3.

  6. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequatelymore » attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars.« less

  7. Biomass power for rural development. Technical progress report, January 1--March 31, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.

  8. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  9. Project UPSTART. Final Report, October 1, 1982-September 30, 1983.

    ERIC Educational Resources Information Center

    Frain, Joan

    The report examines accomplishments of project UPSTART, an intervention approach for young severely multihandicapped infants and their families. The project's outreach provided assistance at six sites, three of which were new. Outreach accomplishments are evaluated according to six objectives, including stimulation of program development,…

  10. Economic aspects of the rehabilitation of the Hiriya landfill.

    PubMed

    Ayalon, O; Becker, N; Shani, E

    2006-01-01

    The Hiriya landfill, Israel's largest, operated from 1952 to 1998. The landfill, located in the heart of the Dan Region, developed over the years into a major landscape nuisance and environmental hazard. In 1998, the Israeli government decided to close the landfill, and in 2001 rehabilitation activities began at the site, including site investigations, engineering and scientific evaluations, and end-use planning. The purpose of the present research is to perform a cost-benefit analysis of engineering and architectural-landscape rehabilitation projects considered for the site. An engineering rehabilitation project is required for the reduction of environmental impacts such as greenhouse gas emissions, slope instability and leachate formation. An architectural-landscape rehabilitation project would consider improvements to the site to make it suitable for future end uses such as a public park. The findings reveal that reclamation is worthwhile only in the case of architectural-landscape rehabilitation of the landfill, converting it into a public park. Engineering rehabilitation alone was found to be unjustified, but is essential to enable the development of a public park.

  11. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less

  12. Site characterization progress report: Yucca Mountain, Nevada. Number 15, April 1--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less

  13. Public outreach supports the entire life-cycle of the Ketzin pilot site, Germany

    NASA Astrophysics Data System (ADS)

    Martens, Sonja; Kollersberger, Tanja; Möller, Fabian; Liebscher, Axel

    2017-04-01

    Interdisciplinary research at the Ketzin pilot site in Germany contributes to the understanding of the geological CO2 storage since 2004. In addition to the research activities, public outreach has been a key element through the entire life-cycle of the project including site assessment, characterization, development as well as operation (2008-2013) and post-closure. From the very beginning of the project, the research activities were accompanied by an open dialogue with the general public including locals and interested people from all over Germany and the world. The visitor centre at the Ketzin site is run by GFZ and the most important contact point to inform about first-hand experiences from the project. Up to now, about 3,000 visitors came to the Ketzin site for guided tours and the annual open house days. In addition, project status and progress are disseminated in brochures and on the public website www.co2ketzin.de. The Ketzin project is also presented in short films, e.g. on monitoring, drilling and well closure. As the post-closure and pre-transfer phase started after the cease of CO2 injection in August 2013 and the injection facility was dismantled in December 2013, we were looking for a tool to further inform about the previous operation and site infrastructure. A virtual tour was set up for the Ketzin site which is accessible via the website. This tour includes several videos which virtually guide you on site and provide information on the (former) facilities. Public acceptance is a key issue for the Ketzin project as it is for any other CO2 storage project. For example, an open communication with the local residents helped to conduct large-scale seismic campaigns without severe restrictions. The experience from the Ketzin pilot site shows that honest communication and a diverse dissemination program is able to overcome critical public perception even for highly debated technologies.

  14. The Ensembl genome database project.

    PubMed

    Hubbard, T; Barker, D; Birney, E; Cameron, G; Chen, Y; Clark, L; Cox, T; Cuff, J; Curwen, V; Down, T; Durbin, R; Eyras, E; Gilbert, J; Hammond, M; Huminiecki, L; Kasprzyk, A; Lehvaslaiho, H; Lijnzaad, P; Melsopp, C; Mongin, E; Pettett, R; Pocock, M; Potter, S; Rust, A; Schmidt, E; Searle, S; Slater, G; Smith, J; Spooner, W; Stabenau, A; Stalker, J; Stupka, E; Ureta-Vidal, A; Vastrik, I; Clamp, M

    2002-01-01

    The Ensembl (http://www.ensembl.org/) database project provides a bioinformatics framework to organise biology around the sequences of large genomes. It is a comprehensive source of stable automatic annotation of the human genome sequence, with confirmed gene predictions that have been integrated with external data sources, and is available as either an interactive web site or as flat files. It is also an open source software engineering project to develop a portable system able to handle very large genomes and associated requirements from sequence analysis to data storage and visualisation. The Ensembl site is one of the leading sources of human genome sequence annotation and provided much of the analysis for publication by the international human genome project of the draft genome. The Ensembl system is being installed around the world in both companies and academic sites on machines ranging from supercomputers to laptops.

  15. [Application of the technique of analytical structure of project for the sub-project of websites catalog of the Virtual Health Library-Nursing].

    PubMed

    dos, Santos Luís Augusto; Marin, Heimar de Fátima; Marques, Isaac Rosa; Cunha, Isabel Cristina Kowal Olm

    2007-01-01

    This work intents, in a didactic form, to explain the benefits of use of a technique of project management, named Work Breakdown Structure: a graphical tool to identify the main results to be developed in a project. The real examples are applied to a sub-project of the Virtual Library in Health in Nursing (BVS-Enfermagem) to development of the Sites Catalogs. The benefits of graphical visualization for a major agreement between professionals of different expertise are presented.

  16. A tale of three Brownfields

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sweet, F.R.; Worthington, M.A.; Belli, E.

    Contaminated site remediation and reuse, or Brownfield redevelopment, has become an increasingly important approach to site development in the northeast corridor, yet the scale of this activity is but a fraction of its full potential. The problem lies in the multi-jurisdictional quagmire that confronts a Brownfield project. Permitting such projects is an overly taxing dynamic process that has become a staple diet for adept multidisciplinary consulting firms. Limited government sanctions such as clean sites initiatives and economic revitalization zones are at best, when successful, interesting bench studies. The central hypothesis that, if regulations are streamlined then site reuse will occur,more » is sound. Yet streamlining brings concerns that the protection of public health and the environment will be compromised and that the result will be a lower standard of public protection for urban populations. The authors postulate that the permitting of Brownfield projects can be streamlined without creating a double standard of risk tolerance. The authors present evidence of this by comparing publicly and privately funded projects.« less

  17. Surgical Tooth Implants, Combat and Field.

    DTIC Science & Technology

    1985-11-15

    project in the development of dental implantology must not be overlooked. The early stages of this project clearly defined that rigid fixation of an...a long-term implant study of a serrated ceramic dental implant designed for fresh extraction sites. The baboon study was successfully completed last...materials. A series of graded dental implants have been produce’ to provide an interference fit in any fresh extraction site. The long-term implant

  18. Quantitative CMMI Assessment for Offshoring through the Analysis of Project Management Repositories

    NASA Astrophysics Data System (ADS)

    Sunetnanta, Thanwadee; Nobprapai, Ni-On; Gotel, Olly

    The nature of distributed teams and the existence of multiple sites in offshore software development projects pose a challenging setting for software process improvement. Often, the improvement and appraisal of software processes is achieved through a turnkey solution where best practices are imposed or transferred from a company’s headquarters to its offshore units. In so doing, successful project health checks and monitoring for quality on software processes requires strong project management skills, well-built onshore-offshore coordination, and often needs regular onsite visits by software process improvement consultants from the headquarters’ team. This paper focuses on software process improvement as guided by the Capability Maturity Model Integration (CMMI) and proposes a model to evaluate the status of such improvement efforts in the context of distributed multi-site projects without some of this overhead. The paper discusses the application of quantitative CMMI assessment through the collection and analysis of project data gathered directly from project repositories to facilitate CMMI implementation and reduce the cost of such implementation for offshore-outsourced software development projects. We exemplify this approach to quantitative CMMI assessment through the analysis of project management data and discuss the future directions of this work in progress.

  19. Bayesian-network-based safety risk assessment for steel construction projects.

    PubMed

    Leu, Sou-Sen; Chang, Ching-Miao

    2013-05-01

    There are four primary accident types at steel building construction (SC) projects: falls (tumbles), object falls, object collapse, and electrocution. Several systematic safety risk assessment approaches, such as fault tree analysis (FTA) and failure mode and effect criticality analysis (FMECA), have been used to evaluate safety risks at SC projects. However, these traditional methods ineffectively address dependencies among safety factors at various levels that fail to provide early warnings to prevent occupational accidents. To overcome the limitations of traditional approaches, this study addresses the development of a safety risk-assessment model for SC projects by establishing the Bayesian networks (BN) based on fault tree (FT) transformation. The BN-based safety risk-assessment model was validated against the safety inspection records of six SC building projects and nine projects in which site accidents occurred. The ranks of posterior probabilities from the BN model were highly consistent with the accidents that occurred at each project site. The model accurately provides site safety-management abilities by calculating the probabilities of safety risks and further analyzing the causes of accidents based on their relationships in BNs. In practice, based on the analysis of accident risks and significant safety factors, proper preventive safety management strategies can be established to reduce the occurrence of accidents on SC sites. Copyright © 2013 Elsevier Ltd. All rights reserved.

  20. National Stormwater Calculator: Low Impact Development ...

    EPA Pesticide Factsheets

    Stormwater discharges continue to cause impairment of our Nation’s waterbodies. EPA has developed the National Stormwater Calculator (SWC) to help support local, state, and national stormwater management objectives to reduce runoff through infiltration and retention using green infrastructure practices as low impact development (LID) controls. The primary focus of the SWC is to inform site developers on how well they can meet a desired stormwater retention target with and without the use of green infrastructure. It can also be used by landscapers and homeowners. Platform. The SWC is a Windows-based desktop program that requires an internet connection. A mobile web application version that will be compatible with all operating systems is currently being developed and is expected to be released in the fall of 2017.Cost Module. An LID cost estimation module within the application allows planners and managers to evaluate LID controls based on comparison of regional and national project planning level cost estimates (capital and average annual maintenance) and predicted LID control performance. Cost estimation is accomplished based on user-identified size configuration of the LID control infrastructure and other key project and site-specific variables. This includes whether the project is being applied as part of new development or redevelopment and if there are existing site constraints.Climate Scenarios. The SWC allows users to consider how runoff may vary based

  1. Best Practices for Siting Solar Photovoltaics on Municipal Solid Waste Landfills. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kiatreungwattana, K.; Mosey, G.; Jones-Johnson, S.

    2013-04-01

    The Environmental Protection Agency and the National Renewable Energy Laboratory developed this best practices document to address common technical challenges for siting solar photovoltaics (PV) on municipal solid waste (MSW) landfills. The purpose of this document is to promote the use of MSW landfills for solar energy systems. Closed landfills and portions of active landfills with closed cells represent thousands of acres of property that may be suitable for siting solar photovoltaics (PV). These closed landfills may be suitable for near-term construction, making these sites strong candidate to take advantage of the 30% Federal Business Energy Investment Tax Credit. Itmore » was prepared in response to the increasing interest in siting renewable energy on landfills from solar developers; landfill owners; and federal, state, and local governments. It contains examples of solar PV projects on landfills and technical considerations and best practices that were gathered from examining the implementation of several of these projects.« less

  2. Fertilizer effects on attaining vegetation requirements.

    DOT National Transportation Integrated Search

    2014-02-01

    This project was developed to evaluate the effects of varying the substrate and fertilization regimes on the success of complex warm-season grass and forb seedings on recent roadside construction sites. Re-vegetating construction projects is required...

  3. Navajo-Hopi Land Commission Renewable Energy Development Project (NREP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas Benally, Deputy Director,

    2012-05-15

    The Navajo Hopi Land Commission Office (NHLCO), a Navajo Nation executive branch agency has conducted activities to determine capacity-building, institution-building, outreach and management activities to initiate the development of large-scale renewable energy - 100 megawatt (MW) or larger - generating projects on land in Northwestern New Mexico in the first year of a multi-year program. The Navajo Hopi Land Commission Renewable Energy Development Project (NREP) is a one year program that will develop and market a strategic business plan; form multi-agency and public-private project partnerships; compile site-specific solar, wind and infrastructure data; and develop and use project communication and marketingmore » tools to support outreach efforts targeting the public, vendors, investors and government audiences.« less

  4. EU Climate-KIC Innovation Blue Green Dream Project: Creation of Educational Experience, Communication and Dissemination

    NASA Astrophysics Data System (ADS)

    Tchiguirinskaia, Ioulia; Gires, Auguste; Vicari, Rosa; Schertzer, Daniel; Maksimovic, Cedo

    2013-04-01

    The combined effects of climate change and increasing urbanization call for a change of paradigm for planning, maintenance and management of new urban developments and retrofitting of existing ones to maximize ecosystem services and increase resilience to the adverse climate change effects. This presentation will discuss synergies of the EU Climate-KIC Innovation Blue Green Dream (BGD) Project in promoting the BGD demonstration and training sites established in participating European countries. The BGD demonstration and training sites show clear benefits when blue and green infrastructures are considered together. These sites present a unique opportunity for community learning and dissemination. Their development and running acts as a hub for engineers, architects, planners and modellers to come together in their design and implementation stage. This process, being captured in a variety of media, creates a corpus of knowledge, anchored in specific examples of different scales, types and dimensions. During the EU Climate-KIC Innovation Blue Green Dream Project, this corpus of knowledge will be used to develop dissemination and training materials whose content will be customised to fit urgent societal needs.

  5. Health diplomacy the adaptation of global health interventions to local needs in sub-Saharan Africa and Thailand: Evaluating findings from Project Accept (HPTN 043)

    PubMed Central

    2012-01-01

    Background Study-based global health interventions, especially those that are conducted on an international or multi-site basis, frequently require site-specific adaptations in order to (1) respond to socio-cultural differences in risk determinants, (2) to make interventions more relevant to target population needs, and (3) in recognition of ‘global health diplomacy' issues. We report on the adaptations development, approval and implementation process from the Project Accept voluntary counseling and testing, community mobilization and post-test support services intervention. Methods We reviewed all relevant documentation collected during the study intervention period (e.g. monthly progress reports; bi-annual steering committee presentations) and conducted a series of semi-structured interviews with project directors and between 12 and 23 field staff at each study site in South Africa, Zimbabwe, Thailand and Tanzania during 2009. Respondents were asked to describe (1) the adaptations development and approval process and (2) the most successful site-specific adaptations from the perspective of facilitating intervention implementation. Results Across sites, proposed adaptations were identified by field staff and submitted to project directors for review on a formally planned basis. The cross-site intervention sub-committee then ensured fidelity to the study protocol before approval. Successfully-implemented adaptations included: intervention delivery adaptations (e.g. development of tailored counseling messages for immigrant labour groups in South Africa) political, environmental and infrastructural adaptations (e.g. use of local community centers as VCT venues in Zimbabwe); religious adaptations (e.g. dividing clients by gender in Muslim areas of Tanzania); economic adaptations (e.g. co-provision of income generating skills classes in Zimbabwe); epidemiological adaptations (e.g. provision of ‘youth-friendly’ services in South Africa, Zimbabwe and Tanzania), and social adaptations (e.g. modification of terminology to local dialects in Thailand: and adjustment of service delivery schedules to suit seasonal and daily work schedules across sites). Conclusions Adaptation selection, development and approval during multi-site global health research studies should be a planned process that maintains fidelity to the study protocol. The successful implementation of appropriate site-specific adaptations may have important implications for intervention implementation, from both a service uptake and a global health diplomacy perspective. PMID:22716131

  6. A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terry Battiest

    2012-11-30

    The project, A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation, is funded under a solicitation issued by the U.S. Department of Energy Tribal Energy Program. Funding provided by the grant allowed the Navajo Nation to measure wind potential at two sites, one located within the boundaries of the Navajo Nation and the other off-reservation during the project period (September 5, 2005 - September 30, 2009). The recipient for the grant award is the Navajo Tribal Utility Authority (NTUA). The grant allowed the Navajo Nation and NTUA manage the wind feasibility from initial site selection through themore » decision-making process to commit to a site for wind generation development. The grant activities help to develop human capacity at NTUA and help NTUA to engage in renewable energy generation activities, including not only wind but also solar and biomass. The final report also includes information about development activities regarding the sited included in the grant-funded feasibility study.« less

  7. Study of Monumental Heritage Traditional Moroccan for a Valorization and Conservation of Collective Memory Development for Socio-Eco-Sustainable Tourism-case Kasbah Chellah, Rabat

    NASA Astrophysics Data System (ADS)

    belhaj, siham; Bahi, Lahcen; Akhssas, Ahmed

    2016-04-01

    Rabat imperial city and capital of Morocco in 2012 was named a World Heritage Site by Unesco for its value,location and heritage significance of several historic sites it contains, which dating back to the 8th century by Chellah example. Chellah is an important historical site economically, culturally and archaeologically .This site is a result of a combination between the Muslim Arab past and the Western modernism, it not only contains the remains of ancient civilizations Phoenician, Carthaginian and Roman but its walls and gates illustrate various lifestyles and multiples legends, the architecture of this site has inspired many writers and painters during all the centuries. Chellah Attracts more and more tourists from milliers of different origins and of different ages, it is ultimate touristiclandmark-forsaken-, it Suffers of ruthless effect of nature (physicals-chemicals degradations) and human and urban development. The authorities aware of the historical, cultural, social, economic heritage of this site, and Demanded Decided to valorize, Rehabilitate and restore the Kasbah Chellah. But given the complexity of the action of "safeguard" the site is still drowning in the economic constraints(size of the site and diversity of its components and architecture, priority, state of the financial markets), legal,social, technical (lack of data, the problem of integration of research centers in the proposed rehabilitation of historic sites in degradation old method, misdiagnosis) and also in the maze to find an integrated restoration policy that takes into account all aspects of rehabilitated the historical monuments. The objective of this project is to develop a clear vision of actually situation by enumeration of problems of degradation that knows the site of Chellah, to sew a multidimensional table of issues facing the current project of rehabilitation the site in question, to raise awareness stakeholders on the need for networking of all energies and all knowledge available to ensure the survival of Moroccan heritage and also push a reflection towards planning and development policy and food that exceeds the usual rehabilitated to another which promoted the historical,cultural and social continuity that involves local people in the project of rehabilitation .

  8. Project Village conceptual plans. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project, Converse County, Wyoming; proposed housing facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-01-01

    The WyCoal Project Village is a housing facility proposed adjacent to the Wyoming Coal Gasification Project plant construction site that would accommodate single workers in dormitory units and singles or couples at a recreation vehicle park. Centralized services and recreational facilities are also to be provided. The provision for some mobile home units to be used in lieu of RV spaces has been considered but would be developed only if a strong demonstrated demand from singles and couples required such a provision. No children will be allowed at the Project Village as accommodations for families will be available in themore » town of Douglas. The development program for the Project Village calls for a total plan capacity of 225 living units: 1500 dormitory rooms and 750 recreational vehicle spaces. However, the total units to be developed will not exceed 1800 with peak employment, including couples at the Recreational Vehicle Park, not anticipated to exceed 2000. The flexibility within the maximum plan capacity of 2250 will allow for the development of an appropriate balance of housing units geared to the on-site project demands as plant construction occurs. At this time a mix of approximately 1200 dormitory rooms and 600 RV spaces appears appropriate for planning purposes.« less

  9. Discovery of Sound in the Sea (DOSITS) Web Site Development

    DTIC Science & Technology

    2016-06-20

    of Sound in the Sea (DOSITS) Web Site Development 5b. GRANT NUMBER NOOO 14- 12- 1-0169 5c. PROGRAM ELEMENT NUMBER 6 . AUTHOR(S) 5d. PROJECT NUMBER...DOSITS) Web Site Development ONR Grant N00014-12-1-0169 Period of Performance: 01 January 2012- 31 December 2014 Principal Investigator Peter F...The web traffic numbers exclude all known search engines and other spiders, as well as traffic from the University of Rhode Island Graduate School

  10. LANDFILL GAS ENERGY UTILIZATION EXPERIENCE: DISCUSSION OF TECHNICAL AND NON-TECHNICAL ISSUES, SOLUTIONS, AND TRENDS

    EPA Science Inventory

    The report discusses technical and non-technical considerations associated with the development and operation of landfill gas to energy projects. Much of the report is based on interviews and site visits with the major developers and operators of the more than 110 projects in the...

  11. MMI: Increasing Community Collaboration

    NASA Astrophysics Data System (ADS)

    Galbraith, N. R.; Stocks, K.; Neiswender, C.; Maffei, A.; Bermudez, L.

    2007-12-01

    Building community requires a collaborative environment and guidance to help move members towards a common goal. An effective environment for community collaboration is a workspace that fosters participation and cooperation; effective guidance furthers common understanding and promotes best practices. The Marine Metadata Interoperability (MMI) project has developed a community web site to provide a collaborative environment for scientists, technologists, and data managers from around the world to learn about metadata and exchange ideas. Workshops, demonstration projects, and presentations also provide community-building opportunities for MMI. MMI has developed comprehensive online guides to help users understand and work with metadata standards, ontologies, and other controlled vocabularies. Documents such as "The Importance of Metadata Standards", "Usage vs. Discovery Vocabularies" and "Developing Controlled Vocabularies" guide scientists and data managers through a variety of metadata-related concepts. Members from eight organizations involved in marine science and informatics collaborated on this effort. The MMI web site has moved from Plone to Drupal, two content management systems which provide different opportunities for community-based work. Drupal's "organic groups" feature will be used to provide workspace for future teams tasked with content development, outreach, and other MMI mission-critical work. The new site is designed to enable members to easily create working areas, to build communities dedicated to developing consensus on metadata and other interoperability issues. Controlled-vocabulary-driven menus, integrated mailing-lists, member-based content creation and review tools are facets of the new web site architecture. This move provided the challenge of developing a hierarchical vocabulary to describe the resources presented on the site; consistent and logical tagging of web pages is the basis of Drupal site navigation. The new MMI web site presents enhanced opportunities for electronic discussions, focused collaborative work, and even greater community participation. The MMI project is beginning a new initiative to comprehensively catalog and document tools for marine metadata. The new MMI community-based web site will be used to support this work and to support the work of other ad-hoc teams in the future. We are seeking broad input from the community on this effort.

  12. Systematic development and implementation of interventions to OPtimise Health Literacy and Access (Ophelia).

    PubMed

    Beauchamp, Alison; Batterham, Roy W; Dodson, Sarity; Astbury, Brad; Elsworth, Gerald R; McPhee, Crystal; Jacobson, Jeanine; Buchbinder, Rachelle; Osborne, Richard H

    2017-03-03

    The need for healthcare strengthening to enhance equity is critical, requiring systematic approaches that focus on those experiencing lesser access and outcomes. This project developed and tested the Ophelia (OPtimising HEalth LIteracy and Access) approach for co-design of interventions to improve health literacy and equity of access. Eight principles guided this development: Outcomes focused; Equity driven, Needs diagnosis, Co-design, Driven by local wisdom, Sustainable, Responsive and Systematically applied. We report the application of the Ophelia process where proof-of-concept was defined as successful application of the principles. Nine sites were briefed on the aims of the project around health literacy, co-design and quality improvement. The sites were rural/metropolitan, small/large hospitals, community health centres or municipalities. Each site identified their own priorities for improvement; collected health literacy data using the Health Literacy Questionnaire (HLQ) within the identified priority groups; engaged staff in co-design workshops to generate ideas for improvement; developed program-logic models; and implemented their projects using Plan-Do-Study-Act (PDSA) cycles. Evaluation included assessment of impacts on organisations, practitioners and service users, and whether the principles were applied. Sites undertook co-design workshops involving discussion of service user needs informed by HLQ (n = 813) and interview data. Sites generated between 21 and 78 intervention ideas and then planned their selected interventions through program-logic models. Sites successfully implemented interventions and refined them progressively with PDSA cycles. Interventions generally involved one of four pathways: development of clinician skills and resources for health literacy, engagement of community volunteers to disseminate health promotion messages, direct impact on consumers' health literacy, and redesign of existing services. Evidence of application of the principles was found in all sites. The Ophelia approach guided identification of health literacy issues at each participating site and the development and implementation of locally appropriate solutions. The eight principles provided a framework that allowed flexible application of the Ophelia approach and generation of a diverse set of interventions. Changes were observed at organisational, staff, and community member levels. The Ophelia approach can be used to generate health service improvements that enhance health outcomes and address inequity of access to healthcare.

  13. Decision making guidelines for mining historic landfill sites in Flanders.

    PubMed

    Winterstetter, A; Wille, E; Nagels, P; Fellner, J

    2018-04-20

    This study aims at showing how the United Nations Framework Classification for Resources (UNFC) can help to classify potential landfill mining projects with different levels of maturity, from exploration to production, under technical, socio-economic and project-planning aspects. Taking the example of three former landfill sites in Flanders general decision making guidelines regarding the future management of old landfills are provided. Using the ECLAR methodology for the evaluation (E) and classification (CL) of anthropogenic resources (AR), the individual projects, where clean land and/or materials are recovered, are mapped under the three-dimensional UNFC system. The Bornem project, yields a negative Net Present Value (NPV) of -17 Mio € (-44 €/t of excavated waste), i.e. the project is currently not economically viable. In case of changing key parameters the landfill has, however, reasonable prospects for future economic extraction. The Turnhout land development turned out to be economically viable with a NPV of 361,000 € (8 €/t of excavated waste). The Zuienkerke remediation project is at a too early stage to determine its socioeconomic viability. The main focus to compare and prioritize potential landfill mining projects in Flanders should be on (1) site specific conditions (e.g. landfill's composition, land prices), (2) project related factors (e.g. remediation required vs. resource/land recovery, selected technologies and project set-ups, private vs. public evaluation perspective) and (3) the timing of mining, considering future development of costs, prices, laws, available data and information. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. NATIONAL STORMWATER CALCULATOR USER'S GUIDE ...

    EPA Pesticide Factsheets

    The National Stormwater Calculator is a simple to use tool for computing small site hydrology for any location within the US. It estimates the amount of stormwater runoff generated from a site under different development and control scenarios over a long term period of historical rainfall. The analysis takes into account local soil conditions, slope, land cover and meteorology. Different types of low impact development (LID) practices (also known as green infrastructure) can be employed to help capture and retain rainfall on-site. Future climate change scenarios taken from internationally recognized climate change projections can also be considered. The calculator provides planning level estimates of capital and maintenance costs which will allow planners and managers to evaluate and compare effectiveness and costs of LID controls.The calculator’s primary focus is informing site developers and property owners on how well they can meet a desired stormwater retention target. It can be used to answer such questions as:• What is the largest daily rainfall amount that can be captured by a site in either its pre-development, current, or post-development condition?• To what degree will storms of different magnitudes be captured on site?• What mix of LID controls can be deployed to meet a given stormwater retention target?• How well will LID controls perform under future meteorological projections made by global climate change models?• What are the relativ

  15. Using Remote Sensing, Geomorphology, and Soils to Map Episodic Streams in Drylands

    NASA Astrophysics Data System (ADS)

    Thibodeaux-Yost, S. N. S.

    2016-12-01

    Millions of acres of public land in the California deserts are currently being evaluated and permitted for the construction of large-scale renewable energy projects. The absence of a standard method for identifying episodic streams in arid and semi-arid (dryland) regions is a source of conflict between project developers and the government agencies responsible for conserving natural resources and permitting renewable energy projects. There is a need for a consistent, efficient, and cost-effective dryland stream delineation protocol that accurately reflects the extent and distribution of active watercourses. This thesis evaluates the stream delineation method and results used by the developer for the proposed Ridgecrest Solar Power Project on the El Paso Fan, Ridgecrest, Kern County, California. This evaluation is then compared and contrasted with results achieved using remote sensing, geomorphology, soils, and GIS analysis to identify stream presence on the site. This study's results identified 105 acres of watercourse, a value 10 times greater than that originally identified by the project developer. In addition, the applied methods provide an ecohydrologic base map to better inform project siting and potential project impact mitigation opportunities. This study concludes that remote sensing, geomorphology, and dryland soils can be used to accurately and efficiently identify episodic stream activity and the extent of watercourses in dryland environments.

  16. The EuroSITES network: Integrating and enhancing fixed-point open ocean observatories around Europe

    NASA Astrophysics Data System (ADS)

    Lampitt, Richard S.; Larkin, Kate E.; EuroSITES Consortium

    2010-05-01

    EuroSITES is a 3 year (2008-2011) EU collaborative project (3.5MEuro) with the objective to integrate and enhance the nine existing open ocean fixed point observatories around Europe (www.eurosites.info). These observatories are primarily composed of full depth moorings and make multidisciplinary in situ observations within the water column as the European contribution to the global array OceanSITES (www.oceansites.org). In the first 18 months, all 9 observatories have been active and integration has been significant through the maintenance and enhancement of observatory hardware. Highlights include the enhancement of observatories with sensors to measure O2, pCO2, chlorophyll, and nitrate in near real-time from the upper 1000 m. In addition, some seafloor missions are also actively supported. These include seafloor platforms currently deployed in the Mediterranean, one for tsunami detection and one to monitor fluid flow related to seismic activity and slope stability. Upcoming seafloor science missions in 2010 include monitoring benthic biological communities and associated biogeochemistry as indicators of climate change in both the Northeast Atlantic and Mediterranean. EuroSITES also promotes the development of innovative sensors and samplers in order to progress capability to measure climate-relevant properties of the ocean. These include further developing current technologies for autonomous long-term monitoring of oxygen consumption in the mesopelagic, pH and mesozooplankton abundance. Many of these science missions are directly related to complementary activities in other European projects such as EPOCA, HYPOX and ESONET. In 2010 a direct collaboration including in situ field work will take place between ESONET and EuroSITES. The demonstration mission MODOO (funded by ESONET) will be implemented in 2010 at the EuroSITES PAP observatory. Field work will include deployment of a seafloor lander system with various sensors which will send data to shore in real time via the EuroSITES water column infrastructure. EuroSITES Data management is led by NOCS, UK with CORIOLIS, France as one of the Global Data assembly centre (GDAC) for both EuroSITES and OceanSITES. EuroSITES maintains the OceanSITES and GEO philosophy of open access to data in near real-time. With a common data policy and standardised data formats (OceanSITES NetCDF) EuroSITES is increasing the potential users of in situ ocean datasets and the societal benefit of these data. For instance, CORIOLIS is central to the ever increasing contribution of EuroSITES as an upstream data provider to the GMES project MyOcean (both real-time and delayed-mode data). Outreach and knowledge transfer of EuroSITES activities and results are also a key component to the project with a dedicated outreach website, Fact Sheet, cruise diaries and educational tools being developed in the first 18 months. In 2010 a film will be released to represent the network and this will be distributed to a wide audience through the European network of aquaria and at other outreach events. In addition, the EuroSITES project and it's relevance to global ocean observation initiatives continues to be actively promoted at both scientific and non-specialist meetings and events. By the end of EuroSITES in April 2011, the 9 core ocean observatories will be well integrated. Each observatory will have enhanced infrastructure to include both physical and biogeoechemical sensors. Science missions in the ocean interior and seafloor/subseafloor will have progressed European ocean observational capability significantly. Collaborations will have taken place or will be at an advanced stage of planning with related European and international projects including ESONET FP6 NoE and the NSF funded Ocean Observatories Initiative (OOI) (400M over 5 years). EuroSITES will continue to develop it's contribution to the ocean component of the Group on Earth Observations (GEO) through task AR-09-03c 'Global Ocean Observing Systems' and related societal benefit areas.

  17. Session: Pre-development project risk assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curry, Richard; Linehan, Andy

    This second session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a discussion/question and answer period. The focus of the presentations was on the practices and methodologies used in the wind energy industry for assessing risk to birds and bats at candidate project sites. Presenters offered examples of pre-development siting evaluation requirements set by certain states. Presentation one was titled ''Practices and Methodologies and Initial Screening Tools'' by Richard Curry of Curry and Kerlinger, LLC. Presentation two was titled ''State of the Industry in the Pacific Northwest'' by Andy Linehan, CH2MHILL.

  18. FINAL REPORT WIND POWER WARM SPRINGS RESERVATION TRIBAL LANDS DOE GRANT NUMBER DE-FG36-07GO17077 SUBMITTED BY WARM SPRINGS POWER & WATER ENTERPRISES A CORPORATE ENTITY OF THE CONFEDERATED TRIBES OF WARM SPRINGS WARM SPRINGS, OREGON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jim Manion; Michael Lofting; Wil Sando

    2009-03-30

    Wind Generation Feasibility Warm Springs Power and Water Enterprises (WSPWE) is a corporate entity owned by the Confederated Tribes of the Warm Springs Reservation, located in central Oregon. The organization is responsible for managing electrical power generation facilities on tribal lands and, as part of its charter, has the responsibility to evaluate and develop renewable energy resources for the Confederated Tribes of Warm Springs. WSPWE recently completed a multi-year-year wind resource assessment of tribal lands, beginning with the installation of wind monitoring towers on the Mutton Mountains site in 2003, and collection of on-site wind data is ongoing. The studymore » identified the Mutton Mountain site on the northeastern edge of the reservation as a site with sufficient wind resources to support a commercial power project estimated to generate over 226,000 MWh per year. Initial estimates indicate that the first phase of the project would be approximately 79.5 MW of installed capacity. This Phase 2 study expands and builds on the previously conducted Phase 1 Wind Resource Assessment, dated June 30, 2007. In order to fully assess the economic benefits that may accrue to the Tribes through wind energy development at Mutton Mountain, a planning-level opinion of probable cost was performed to define the costs associated with key design and construction aspects of the proposed project. This report defines the Mutton Mountain project costs and economics in sufficient detail to allow the Tribes to either build the project themselves or contract with a developer under the most favorable terms possible for the Tribes.« less

  19. SUPERFUND INNOVATIVE TECHNOLOGY EVALUATION PROGRAM ANNUAL REPORT TO CONGRESS FY2000

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation Program promotes the development, commercialization, and implementation of innovative hazardous waste treatment technologies. SITE offers a mechanism for conducting joint demonstration and evaluation projects at hazardous waste site...

  20. Development of a new family of normalized modulus reduction and material damping curves

    NASA Astrophysics Data System (ADS)

    Darendeli, Mehmet Baris

    2001-12-01

    As part of various research projects [including the SRS (Savannah River Site) Project AA891070, EPRI (Electric Power Research Institute) Project 3302, and ROSRINE (Resolution of Site Response Issues from the Northridge Earthquake) Project], numerous geotechnical sites were drilled and sampled. Intact soil samples over a depth range of several hundred meters were recovered from 20 of these sites. These soil samples were tested in the laboratory at The University of Texas at Austin (UTA) to characterize the materials dynamically. The presence of a database accumulated from testing these intact specimens motivated a re-evaluation of empirical curves employed in the state of practice. The weaknesses of empirical curves reported in the literature were identified and the necessity of developing an improved set of empirical curves was recognized. This study focused on developing the empirical framework that can be used to generate normalized modulus reduction and material damping curves. This framework is composed of simple equations, which incorporate the key parameters that control nonlinear soil behavior. The data collected over the past decade at The University of Texas at Austin are statistically analyzed using First-order, Second-moment Bayesian Method (FSBM). The effects of various parameters (such as confining pressure and soil plasticity) on dynamic soil properties are evaluated and quantified within this framework. One of the most important aspects of this study is estimating not only the mean values of the empirical curves but also estimating the uncertainty associated with these values. This study provides the opportunity to handle uncertainty in the empirical estimates of dynamic soil properties within the probabilistic seismic hazard analysis framework. A refinement in site-specific probabilistic seismic hazard assessment is expected to materialize in the near future by incorporating the results of this study into state of practice.

  1. Funding Solar Projects at Federal Agencies: Mechanisms and Selection Criteria (Brochure)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Implementing solar energy projects at federal facilities is a process. The project planning phase of the process includes determining goals, building a team, determining site feasibility and selecting the appropriate project funding tool. This fact sheet gives practical guidance to assist decision-makers with understanding and selecting the funding tool that would best address their site goals. Because project funding tools are complex, federal agencies should seek project assistance before making final decisions. High capital requirements combined with limits on federal agency energy contracts create challenges for funding solar projects. Solar developers typically require long-term contracts (15-20) years to spread outmore » the initial investment and to enable payments similar to conventional utility bill payments. In the private sector, 20-year contracts have been developed, vetted, and accepted, but the General Services Administration (GSA) contract authority (federal acquisition regulation [FAR] part 41) typically limits contract terms to 10 years. Payments on shorter-term contracts make solar economically unattractive compared with conventional generation. However, in several instances, the federal sector has utilized innovative funding tools that allow long-term contracts or has created a project package that is economically attractive within a shorter contract term.« less

  2. Waste handling and storage in the decontamination pilot projects of JAEA for environments of Fukushima

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nakayama, S.; Kawase, K.; Iijima, K.

    2013-07-01

    After the Fukushima Daiichi nuclear accident, Japan Atomic Energy Agency (JAEA) was chosen by the national government to conduct decontamination pilot projects at selected sites in Fukushima prefecture. Despite tight boundary conditions in terms of timescale and resources, the projects served their primary purpose to develop a knowledge base to support more effective planning and implementation of stepwise regional remediation of the evacuated zone. A range of established, modified and newly developed techniques were tested under realistic field conditions and their performance characteristics were determined. The results of the project can be summarized in terms of site characterization, cleanup andmore » waste management. A range of options were investigated to reduce the volumes of waste produced and to ensure that decontamination water could be cleaned to the extent that it could be discharged to normal drainage. Resultant solid wastes were packaged in standard flexible containers, labelled and stored at the remediation site (temporary storage until central interim storage becomes available). The designs of such temporary storage facilities were tailored to available sites, but all designs included measures to ensure mechanical stability (e.g., filling void spaces between containers with sand, graded cover with soil) and prevent releases to groundwater (impermeable base and cap, gravity flow drainage including radiation monitors and catch tanks). Storage site monitoring was also needed to check that storage structures would not be perturbed by external events that could include typhoons, heavy snowfalls, freeze/thaw cycles and earthquakes. (authors)« less

  3. Hydrologic, vegetation, and soil data collected in selected wetlands of the Big River Management area, Rhode Island, from 2008 through 2010

    USGS Publications Warehouse

    Borenstein, Meredith S.; Golet, Francis C.; Armstrong, David S.; Breault, Robert F.; McCobb, Timothy D.; Weiskel, Peter K.

    2012-01-01

    The Rhode Island Water Resources Board planned to develop public water-supply wells in the Big River Management Area in Kent County, Rhode Island. Research in the United States and abroad indicates that groundwater withdrawal has the potential to affect wetland hydrology and related processes. In May 2008, the Rhode Island Water Resources Board, the U.S. Geological Survey, and the University of Rhode Island formed a partnership to establish baseline conditions at selected Big River wetland study sites and to develop an approach for monitoring potential impacts once pumping begins. In 2008 and 2009, baseline data were collected on the hydrology, vegetation, and soil characteristics at five forested wetland study sites in the Big River Management Area. Four of the sites were located in areas of potential drawdown associated with the projected withdrawals. The fifth site was located outside the area of projected drawdown and served as a control site. The data collected during this study are presented in this report.

  4. Strategic deployment of CHO expression platforms to deliver Pfizer's Monoclonal Antibody Portfolio.

    PubMed

    Scarcelli, John J; Shang, Tanya Q; Iskra, Tim; Allen, Martin J; Zhang, Lin

    2017-11-01

    Development of stable cell lines for expression of large-molecule therapeutics represents a significant portion of the time and effort required to advance a molecule to enabling regulatory toxicology studies and clinical evaluation. Our development strategy employs two different approaches for cell line development based on the needs of a particular project: a random integration approach for projects where high-level expression is critical, and a site-specific integration approach for projects in which speed and reduced employee time spend is a necessity. Here we describe both our random integration and site-specific integration platforms and their applications in support of monoclonal antibody development and production. We also compare product quality attributes of monoclonal antibodies produced with a nonclonal cell pool or clonal cell lines derived from the two platforms. Our data suggests that material source (pools vs. clones) does not significantly alter the examined product quality attributes. Our current practice is to leverage this observation with our site-specific integration platform, where material generated from cell pools is used for an early molecular assessment of a given candidate to make informed decisions around development strategy. © 2017 American Institute of Chemical Engineers Biotechnol. Prog., 33:1463-1467, 2017. © 2017 American Institute of Chemical Engineers.

  5. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    NASA Technical Reports Server (NTRS)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  6. Activities and interim outcomes of a multi-site development project to promote cognitive support technology use and employment success among postsecondary students with traumatic brain injuries.

    PubMed

    Hendricks, Deborah J; Sampson, Elaine; Rumrill, Phillip; Leopold, Anne; Elias, Eileen; Jacobs, Karen; Nardone, Amanda; Scherer, Marcia; Stauffer, Callista

    2015-01-01

    This article describes the activities and interim outcomes of a multi-site development project called Project Career, designed to promote cognitive support technology (CST) use and employment success for college and university students with traumatic brain injuries (TBIs). To obtain early intervention results from participants in Project Career's first 18 months of operation. Fifty-six students with TBI have participated to date across three implementation sites in Massachusetts, Ohio, and West Virginia, with 25 of these participants being military veterans. Descriptive analyses provide information regarding the participants, the barriers they face due to their TBI in obtaining a post-secondary education, and the impact services provided by Project Career have had to date in ameliorating those difficulties. Inferential statistical analyses provide preliminary results regarding program effectiveness. Preliminary results indicate the program is encouraging students to use CST strategies in the form of iPads and cognitive enhancement applications (also known as 'apps'). Significant results indicate participants are more positive, independent, and social; participants have a more positive attitude toward technology after six months in the program; and participants reported significantly improved experiences with technology during their first six months in the program. Participating students are actively preparing for their careers after graduation through a wide range of intensive vocational supports provided by project staff members.

  7. Internet marketing 101.

    PubMed

    Miller, Ryan J

    2010-11-01

    In an era when social media sites like YouTube, Facebook, and Twitter dominate the popular press, many surgeons overlook the foundational tactics and strategies necessary for long-term practice development and lead generation on the Internet. This article analyzes common errors made by surgeons during the development and implementation of Web site projects, focusing on the areas of strategy development; domain name identification; site plan creation; design considerations; content development; vendor selection; and launch, promotion, and staff training. The article emphasizes that, because the Web site remains the foundation of a surgeon's branding message, minimizing errors during development and construction is critical, particularly in highly competitive or saturated markets, for today's facial plastic surgery practice. Copyright © 2010 Elsevier Inc. All rights reserved.

  8. CO2CARE - Site Closure Assessment Research - Recent Results

    NASA Astrophysics Data System (ADS)

    Wipki, Mario; Liebscher, Axel; Kühn, Michael; Lüth, Stefan; Durucan, Sevket; Deflandre, Jean-Pierre; Wollenweber, Jens; Chadwick, Andy; Böhm, Gualtiero

    2013-04-01

    The EU project CO2CARE, which started in January 2011, supports the large scale demonstration of CCS technology by addressing requirements of operators and regulators face in terms of CO2 storage site abandonment. The CO2CARE consortium, consisting of 24 project partners from universities, research institutes, and the industry, investigate technologies and procedures for abandonment and post-closure safety, satisfying the regulatory requirements for the transfer of responsibility. Nine key injections sites in Europe, USA, Japan, and Australia, each with a specific (hydro) geological and environmental character, were selected for investigations. These sites can be divided into the CO2 storage types on-shore, off-shore, natural CO2 reservoir, depleted gas reservoirs, and saline aquifers. The project mainly focuses on three key areas: - well abandonment and long-term integrity; - reservoir management and prediction from closure to the long-term; - risk management methodologies for long-term safety. These key areas are in turn closely linked to the three high-level requirements of the EU Directive 2009/31/EC, Article 18 for CO2 storage which are: (i) absence of any detectable leakage, (ii) conformity of actual behaviour of the injected CO2 with the modeled behaviour, and (iii) the storage site is evolving towards a situation of long-term stability. The identification of criteria and the development of site abandonment procedures and technologies, which guarantee the fulfillment of the high-level requirements, are the major objectives in CO2CARE. These criteria have to be fulfilled prior to subsequent transfer of responsibility to the competent authorities, typically 20 or 30 years after site closure. Finally, the essential results of the different working groups in CO2CARE will feed into overall guidelines for regulatory compliance and "Best Practice" for site abandonment. Dissemination of the results will show policy makers and the general public how site abandonment procedures for CO2 storage sites can be undertaken sustainably, cost-effectively and with no adverse effect to the local population and the natural environment. After more than two-thirds of the project`s lifetime, an overview of the project`s goals and the most relevant research findings are presented.

  9. Integrating NASA Dryden Research Endeavors into the Teaching-Learning of Mathematics in the K-12 Classroom via the WWW

    NASA Technical Reports Server (NTRS)

    Ward, Robin A.

    2002-01-01

    The primary goal of this project was to continue populating the currently existing web site developed in 1998 in conjunction with the NASA Dryden Flight Research Center and California Polytechnic State University, with more mathematics lesson plans and activities that K-12 teachers, students, home-schoolers, and parents could access. All of the activities, while demonstrating some mathematical topic, also showcase the research endeavors of the NASA Dryden Flight Research Center. The website is located at: http://daniel.calpoly.edu/dfrc/Robin. The secondary goal of this project was to share the web-based activities with educators at various conferences and workshops. To address the primary goal of this project, over the past year, several new activities were posted on the web site and some of the existing activities were enhanced to contain more video clips, photos, and materials for teachers. To address the project's secondary goal, the web-based activities were showcased at several conferences and workshops. Additionally, in order to measure and assess the outreach impact of the web site, a link to the web site hitbox.com was established in April 2001, which allowed for the collection of traffic statistics against the web site (such as the domains of visitors, the frequency of visitors to this web site, etc.) Provided is a description of some of the newly created activities posted on the web site during the project period of 2001-2002, followed by a description of the conferences and workshops at which some of the web-based activities were showcased. Next is a brief summary of the web site's traffic statistics demonstrating its worldwide educational impact, followed by a listing of some of the awards and accolades the web site has received.

  10. Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kramer, Sharon; Previsic, Mirko; Nelson, Peter

    2010-06-17

    Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry inmore » the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal) 3 project sizes: pilot, small commercial, and large commercial The possible combinations total 24 wave technology scenarios and 9 tidal technology scenarios. We evaluated 3 of the 33 scenarios in detail: 1. A small commercial OPT Power Buoy project off the Humboldt County, California coast 2. A small commercial Pelamis Wave Power P-2 project off Makapu’u Point, Oahu, Hawaii 3. A pilot MCT SeaGen tidal project, sited in the Tacoma Narrows, Washington. This framework document used information available from permitting documents that were written to support actual wave or tidal energy projects, but the results obtained here should not be confused with those of the permitting documents1. The main difference between this framework document and permitting documents of currently proposed pilot projects is that this framework identifies key environmental concerns and describes the next steps in addressing those concerns; permitting documents must identify effects, find or declare thresholds of significance, evaluate the effects against the thresholds, and find mitigation measures that will minimize or avoid the effects so they can be considered less-than-significant. Two methodologies, 1) an environmental effects analysis and 2) Raptools, were developed and tested to identify potential environmental effects associated with wave or tidal energy conversion projects. For the environmental effects analysis, we developed a framework based on standard risk assessment techniques. The framework was applied to the three scenarios listed above. The environmental effects analysis addressed questions such as: What is the temporal and spatial exposure of a species at a site? What are the specific potential project effects on that species? What measures could minimize, mitigate, or eliminate negative effects? Are there potential effects of the project, or species’ response to the effect, that are highly uncertain and warrant additional study? The second methodology, Raptools, is a collaborative approach useful for evaluating multiple characteristics of numerous siting or technology alternatives, and it allows us to graphically compare alternatives. We used Raptools to answer these questions: How do the scenarios compare, in terms of exposure, risks, and effects to the ecological and human environments? Are there sites that seem to present the fewest effects regardless of technology and scale? Which attributes account for many or much of the effects associated with wave or tidal energy development?« less

  11. Aeronautics and Aviation Science: Careers and Opportunities Project

    NASA Technical Reports Server (NTRS)

    Texter, P. Cardie

    1998-01-01

    The National Aeronautics and Space Administration funded project, Aeronautics and Aviation Science: Careers and Opportunities has been in operation since July, 1995. This project operated as a collaboration with Massachusetts Corporation for Educational Telecommunications, the Federal Aviation Administration, Bridgewater State College and four targeted "core sites" in the greater Boston area. In its first and second years, a video series on aeronautics and aviation science was developed and broadcast via "live, interactive" satellite feed. Accompanying teacher and student supplementary instructional materials for grades 6-9 were produced and disseminated by the Massachusetts Corporation for Educational Telecommunications (MCET). In the MCET grant application it states that project Take Off! in its initial phase would recruit and train teachers at "core" sites in the greater Boston area, as well as opening participation to other on-line users of MCET's satellite feeds. "Core site" classrooms would become equipped so that teachers and students might become engaged in an interactive format which aimed at not only involving the students during the "live" broadcast of the instructional video series, but which would encourage participation in electronic information gathering and sharing among participants. As a Take Off! project goal, four schools with a higher than average proportion of minority and underrepresented youth were invited to become involved with the project to give these students the opportunity to consider career exploration and development in the field of science aviation and aeronautics. The four sites chosen to participate in this project were: East Boston High School, Dorchester High School, Randolph Junior-Senior High School and Malden High School. In year 3 Dorchester was unable to continue to fully participate and exited out. Danvers was added to the "core site" list in year 3. In consideration of Goals 2000, the National Science Foundation standards for quality of teaching, and an educational agenda that promotes high standards for all students, Aeronautics and Aviation Science: Careers and Opportunities had as its aim to deliver products to schools, both in and outside the project sites, which attempt to incorporate multi-disciplined approaches in the presentation of a curriculum which would be appropriate in any classroom, while also aiming to appeal to young women and minorities. The curriculum was developed to provide students with fundamentals of aeronautics and aviation science. The curriculum also encouraged involving students and teachers in research projects, and further information gathering via electronic bulletin boards and internet capabilities. Though not entirely prescriptive, the curriculum was designed to guide teachers through recommended activities to supplement MCET's live telecast video presentations. Classroom teachers were encouraged to invite local pilots, meteorologists, and others from the field of aviation and aeronautics, particularly women and minorities to visit schools and to field questions from the students.

  12. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... development, including work site modification and use of advanced learning technology for skills training. (3...-based supported employment projects? 380.5 Section 380.5 Education Regulations of the Offices of the... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The...

  13. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... development, including work site modification and use of advanced learning technology for skills training. (3...-based supported employment projects? 380.5 Section 380.5 Education Regulations of the Offices of the... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The...

  14. 34 CFR 380.5 - What activities may the Secretary fund under community-based supported employment projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... development, including work site modification and use of advanced learning technology for skills training. (3...-based supported employment projects? 380.5 Section 380.5 Education Regulations of the Offices of the... the Secretary fund under community-based supported employment projects? (a) Authorized activities. The...

  15. Vocational Options for Deaf-Blind Youth Through Community-Based Training. Project ADVANCE.

    ERIC Educational Resources Information Center

    McGinnity, Betsy L.

    Project ADVANCE currently provides vocational training to 26 deaf-blind adolescents and young adults attending Perkins School for the Blind in Watertown, Massachusetts. The project has developed community work sites in four different vocational options: (1) competitive employment, (2) a student operated small business, (3) sheltered enclave within…

  16. Predicting and Mapping Potential Whooping Crane Stopover Habitat to Guide Site Selection for Wind Energy Projects

    EPA Science Inventory

    Migration is one of the most poorly understood components of a bird’s life cycle. For that reason, migratory stopover habitats are often not part of conservation planning and may be overlooked when planning new development projects. This project highlights and addresses an overl...

  17. The HyperSign Project.

    ERIC Educational Resources Information Center

    Abdulezer, Susan

    This report describes ongoing activities and results of the HyperSign Immersion Project developed at the Public School for the Deaf in New York City, New York. The project's objectives were to: (1) provide a means to enable Deaf students to assume a self-directed role in education; (2) provide an on-site prototype of a technologically supportive…

  18. 78 FR 46860 - Proposed Waiver and Extension of the Project Period for the Technical Assistance Coordination Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... funded centers, professional organizations, and other stakeholders to collaborate, solve problems...; (b) maintaining a Web site that houses tools that TA&D Network projects have developed or can use in...

  19. Technical Support for Contaminated Sites

    EPA Science Inventory

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled...

  20. Marine Hydrokinetic Energy Site Identification and Ranking Methodology Part II: Tidal Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilcher, Levi; Thresher, Robert; Tinnesand, Heidi

    Marine hydrokinetic energy is a promising and growing piece of the renewable energy sector that offers high predictability and additional energy sources for a diversified energy economy. This report investigates the market opportunities for tidal energy along the U.S. coastlines. It is part one of a two-part investigation into the United States' two largest marine hydrokinetic resources (wave and tidal). Tidal energy technology is still an emerging form of renewable energy for which large-scale grid-connected project costs are currently poorly defined. Ideally, device designers would like to know the resource conditions at economical project sites so they can optimize devicemore » designs. On the other hand, project developers need detailed device cost data to identify sites where projects are economical. That is, device design and siting are, to some extent, a coupled problem. This work describes a methodology for identifying likely deployment locations based on a set of criteria that tidal energy experts in industry, academia, and national laboratories agree are likely to be important factors for all technology types. Several factors that will affect tidal project costs and siting have not been considered here -- including permitting constraints, conflicting use, seasonal resource variability, extreme event likelihood, and distance to ports -- because consistent data are unavailable or technology-independent scoring could not be identified. As the industry continues to mature and converge around a subset of device archetypes with well-defined costs, more precise investigations of project siting that include these factors will be possible. For now, these results provide a high-level guide pointing to the regions where markets and resource will one day support commercial tidal energy projects.« less

  1. Campus Demonstration Sites for Sustainable Systems and Design: Five "Creation" Stories.

    ERIC Educational Resources Information Center

    Jack, Kathy; Ihara, Dan, Ed.

    This paper provides a summary of the development and management of five campus demonstration sites designed to create harmony with natural systems and meet current student needs without compromising the needs of future generations. Information for each campus includes an overview of the site, project origins, the proposal and design process, the…

  2. 77 FR 14319 - Unmanned Aircraft System Test Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-09

    ... DoD and NASA. A project at a test range (a defined geographic area where research and development are..., the FAA believes that the new test sites need to include focal points to ensure that research is... and experience in conducting UAS operations and research. Methods that test site operators can use for...

  3. International. [SITE 2002 Section].

    ERIC Educational Resources Information Center

    Willis, Dee Anna, Ed.

    This document contains the following papers on international issues from the SITE (Society for Information Technology & Teacher Education) 2002 conference: (1) "The Management of Technological Change within Faculties in International American Schools" (Martine Audeoud); (2) "Going Global: Using a Website Development Project To…

  4. CCS Activities Being Performed by the U.S. DOE

    PubMed Central

    Dressel, Brian; Deel, Dawn; Rodosta, Traci; Plasynski, Sean; Litynski, John; Myer, Larry

    2011-01-01

    The United States Department of Energy (DOE) is the lead federal agency for the development and deployment of carbon sequestration technologies. Its mission includes promoting scientific and technological innovations and transfer of knowledge for safe and permanent storage of CO2 in the subsurface. To accomplish its mission, DOE is characterizing and classifying potential geologic storage reservoirs in basins throughout the U.S. and Canada, and developing best practices for project developers, to help ensure the safety of future geologic storage projects. DOE’s Carbon Sequestration Program, Regional Carbon Sequestration Partnership (RCSP) Initiative, administered by the National Energy Technology Laboratory (NETL), is identifying, characterizing, and testing potential injection formations. The RCSP Initiative consists of collaborations among government, industry, universities, and international organizations. Through this collaborative effort, a series of integrated knowledge-based tools have been developed to help potential sequestration project developers. They are the Carbon Sequestration Atlas of the United States and Canada, National Carbon Sequestration Database and Geographic System (NATCARB), and best practice manuals for CCS including Depositional Reservoir Classification for CO2; Public Outreach and Education for Carbon Storage Projects; Monitoring, Verification, and Accounting of CO2 Stored in Deep Geologic Formation; Site Screening, Site Selection, and Initial Characterization of CO2 Storage in Deep Geologic Formations. DOE’s future research will help with refinement of these tools and additional best practice manuals (BPM) which focus on other technical aspects of project development. PMID:21556188

  5. Engineering Technical Support Center Annual Report Fiscal ...

    EPA Pesticide Factsheets

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  6. Alcohol Abuse Prevention: A Comprehensive Guide for Youth Organizations.

    ERIC Educational Resources Information Center

    Boys' Clubs of America, New York, NY.

    This guide, the culmination of a three year Project TEAM effort by the Boys' Clubs of America, describes numerous strategies for developing an alcohol abuse prevention program. The core of this guide consists of program models developed by the Boys' Club project at seven pilot sites. The models presented cover the following areas: peer leadership,…

  7. THE ROLE OF THE NONPROFESSIONAL IN THE MANPOWER DEVELOPMENT PROGRAMS. SUBMITTED FOR OPERATION RETRIEVAL.

    ERIC Educational Resources Information Center

    GROSSER, CHARLES

    BASED ON A REVIEW OF REPORTS AND OTHER DOCUMENTS PREPARED BY VARIOUS MANPOWER DEVELOPMENT TRAINING ACT-SPONSORED YOUTH-TRAINING PROJECTS AND ON INTERVIEWS WITH ADMINISTRATORS AND COMMUNITY RESIDENTS AT FIVE PROJECT SITES, THIS STUDY EVALUATES THE USE OF NONPROFESSIONAL STAFF IN THE OPERATION OF MANPOWER PROGRAMS. THE CONSEQUENCES OF SUCH…

  8. MPL-Net data products available at co-located AERONET sites and field experiment locations

    NASA Astrophysics Data System (ADS)

    Welton, E. J.; Campbell, J. R.; Berkoff, T. A.

    2002-05-01

    Micro-pulse lidar (MPL) systems are small, eye-safe lidars capable of profiling the vertical distribution of aerosol and cloud layers. There are now over 20 MPL systems around the world, and they have been used in numerous field experiments. A new project was started at NASA Goddard Space Flight Center in 2000. The new project, MPL-Net, is a coordinated network of long-time MPL sites. The network also supports a limited number of field experiments each year. Most MPL-Net sites and field locations are co-located with AERONET sunphotometers. At these locations, the AERONET and MPL-Net data are combined together to provide both column and vertically resolved aerosol and cloud measurements. The MPL-Net project coordinates the maintenance and repair for all instruments in the network. In addition, data is archived and processed by the project using common, standardized algorithms that have been developed and utilized over the past 10 years. These procedures ensure that stable, calibrated MPL systems are operating at sites and that the data quality remains high. Rigorous uncertainty calculations are performed on all MPL-Net data products. Automated, real-time level 1.0 data processing algorithms have been developed and are operational. Level 1.0 algorithms are used to process the raw MPL data into the form of range corrected, uncalibrated lidar signals. Automated, real-time level 1.5 algorithms have also been developed and are now operational. Level 1.5 algorithms are used to calibrate the MPL systems, determine cloud and aerosol layer heights, and calculate the optical depth and extinction profile of the aerosol boundary layer. The co-located AERONET sunphotometer provides the aerosol optical depth, which is used as a constraint to solve for the extinction-to-backscatter ratio and the aerosol extinction profile. Browse images and data files are available on the MPL-Net web-site. An overview of the processing algorithms and initial results from selected sites and field experiments will be presented. The capability of the MPL-Net project to produce automated real-time (next day) profiles of aerosol extinction will be shown. Finally, early results from Level 2.0 and Level 3.0 algorithms currently under development will be presented. The level 3.0 data provide continuous (day/night) retrievals of multiple aerosol and cloud heights, and optical properties of each layer detected.

  9. Using Radar, Lidar, and Radiometer measurements to Classify Cloud Type and Study Middle-Level Cloud Properties

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Zhien

    2010-06-29

    The project is mainly focused on the characterization of cloud macrophysical and microphysical properties, especially for mixed-phased clouds and middle level ice clouds by combining radar, lidar, and radiometer measurements available from the ACRF sites. First, an advanced mixed-phase cloud retrieval algorithm will be developed to cover all mixed-phase clouds observed at the ACRF NSA site. The algorithm will be applied to the ACRF NSA observations to generate a long-term arctic mixed-phase cloud product for model validations and arctic mixed-phase cloud processes studies. To improve the representation of arctic mixed-phase clouds in GCMs, an advanced understanding of mixed-phase cloud processesmore » is needed. By combining retrieved mixed-phase cloud microphysical properties with in situ data and large-scale meteorological data, the project aim to better understand the generations of ice crystals in supercooled water clouds, the maintenance mechanisms of the arctic mixed-phase clouds, and their connections with large-scale dynamics. The project will try to develop a new retrieval algorithm to study more complex mixed-phase clouds observed at the ACRF SGP site. Compared with optically thin ice clouds, optically thick middle level ice clouds are less studied because of limited available tools. The project will develop a new two wavelength radar technique for optically thick ice cloud study at SGP site by combining the MMCR with the W-band radar measurements. With this new algorithm, the SGP site will have a better capability to study all ice clouds. Another area of the proposal is to generate long-term cloud type classification product for the multiple ACRF sites. The cloud type classification product will not only facilitates the generation of the integrated cloud product by applying different retrieval algorithms to different types of clouds operationally, but will also support other research to better understand cloud properties and to validate model simulations. The ultimate goal is to improve our cloud classification algorithm into a VAP.« less

  10. Seneca Compressed Air Energy Storage (CAES) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2012-11-30

    Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant constructionmore » with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.« less

  11. Air/Superfund national technical guidance study series, Volume 2. Estimation of baseline air emission at Superfund sites. Interim report(Final)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    This volume is one in a series of manuals prepared for EPA to assist its Remedial Project Managers in the assessment of the air contaminant pathway and developing input data for risk assessment. The manual provides guidance on developing baseline-emission estimates from hazardous waste sites. Baseline-emission estimates (BEEs) are defined as emission rates estimated for a site in its undisturbed state. Specifically, the manual is intended to: Present a protocol for selecting the appropriate level of effort to characterize baseline air emissions; Assist site managers in designing an approach for BEEs; Describe useful technologies for developing site-specific baseline emission estimatesmore » (BEEs); Help site managers select the appropriate technologies for generating site-specific BEEs.« less

  12. FINAL TECHNICAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fargione, Joseph

    2012-02-24

    The United States has abundant wind resources, such that only about 3% of the resource would need to be developed to achieve the goal of producing 20% of electricity in the United States by 2030. Inappropriately sited wind development may result in conflicts with wildlife that can delay or derail development projects, increase projects costs, and may degrade important conservation values. The most cost-effective approach to reducing such conflicts is through landscape-scale siting early in project development. To support landscape scale siting that avoids sensitive areas for wildlife, we compiled a database on species distributions, wind resource, disturbed areas, andmore » land ownership. This database can be viewed and obtained via http://wind.tnc.org/awwi. Wind project developers can use this web tool to identify potentially sensitive areas and areas that are already disturbed and are therefore likely to be less sensitive to additional impacts from wind development. The United States goal of producing 20% of its electricity from wind energy by the year 2030 would require 241 GW of terrestrial nameplate capacity. We analyzed whether this goal could be met by using lands that are already disturbed, which would minimize impacts to wildlife. Our research shows that over 14 times the DOE goal could be produced on lands that are already disturbed (primarily cropland and oil and gas fields), after taking into account wind resource availability and areas that would be precluded from wind development because of existing urban development or because of development restrictions. This work was published in the peer reviewed science journal PLoS ONE (a free online journal) and can be viewed here: http://www.plosone.org/article/info%3Adoi%2F10.1371%2Fjournal.pone.0017566. Even projects that are sited appropriately may have some impacts on wildlife habitat that can be offset with offsite compensatory mitigation. We demonstrate one approach to mapping and quantifying mitigation costs, using the state of Kansas as a case study. Our approach considers a range of conservation targets (species and habitat) and calculates mitigation costs based on actual costs of the conservation actions (protection and restoration) that would be needed to fully offset impacts. This work was published in the peer reviewed science journal PLoS ONE (a free online journal) and can be viewed here: http://www.plosone.org/article/info%3Adoi%2F10.1371%2Fjournal.pone.0026698.« less

  13. Development of a Portable, Ground-Based Ozone Lidar Instrument for Tropospheric Ozone Research and Educational Training

    NASA Technical Reports Server (NTRS)

    Chyba, Thomas; Zenker, Thomas

    1998-01-01

    The objective of this project is to develop a portable, eye-safe, ground-based ozone lidar instrument specialized for ozone differential absorption lidar (DIAL) measurements in the troposphere. This prototype instrument is intended to operate at remote field sites and to serve as the basic unit for monitoring projects requiring multi-instrument networks, such as that discussed in the science plan for the Global Tropospheric Ozone Project (GTOP). This instrument will be based at HU for student training in lidar technology as well as atmospheric ozone data analysis and interpretation. It will be also available for off-site measurement campaigns and will serve as a test bed for further instrument development. Later development beyond this grant to extend the scientific usefulness of the instrument may include incorporation of an aerosol channel and upgrading the laser to make stratospheric ozone measurements. Undergraduate and graduate students have been and will be active participants in this research effort.

  14. Development and demonstration of a telerobotic excavation system

    NASA Technical Reports Server (NTRS)

    Burks, Barry L.; Thompson, David H.; Killough, Stephen M.; Dinkins, Marion A.

    1994-01-01

    Oak Ridge National Laboratory is developing remote excavation technologies for the Department of Energy's Office (DOE) of Technology Development, Robotics Technology Development Program, and also for the Department of Defense (DOD) Project Manager for Ammunition Logistics. This work is being done to meet the need for remote excavation and removal of radioactive and contaminated buried waste at several DOE sites and unexploded ordnance at DOD sites. System requirements are based on the need to uncover and remove waste from burial sites in a way that does not cause unnecessary personnel exposure or additional environmental contamination. Goals for the current project are to demonstrate dexterous control of a backhoe with force feedback and to implement robotic operations that will improve productivity. The Telerobotic Small Emplacement Excavator is a prototype system that incorporates the needed robotic and telerobotic capabilities on a commercially available platform. The ability to add remote dexterous teleoperation and robotic operating modes is intended to be adaptable to other commercially available excavator systems.

  15. Development and Validation of a Quantitative Framework and Management Expectation Tool for the Selection of Bioremediation Approaches at Chlorinated Ethene Sites

    DTIC Science & Technology

    2015-12-01

    FINAL REPORT Development and Validation of a Quantitative Framework and Management Expectation Tool for the Selection of Bioremediation ...TITLE AND SUBTITLE Development and Validation of a Quantitative Framework and Management Expectation Tool for the Selection of Bioremediation ...project ER-201129 was to develop and validate a framework used to make bioremediation decisions based on site-specific physical and biogeochemical

  16. Developing Your School Grounds: A Planning Primer.

    ERIC Educational Resources Information Center

    Clearing, 1998

    1998-01-01

    Describes the planning steps and other practical considerations to establish successful trails, outdoor classrooms, or other environmental education improvements on school grounds. Steps include determining needs and methods for promoting projects, resources, site assessment, property lines, safety, and maintenance. Possible projects described…

  17. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  18. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  19. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  20. Implementation of a deidentified federated data network for population-based cohort discovery

    PubMed Central

    Abend, Aaron; Mandel, Aaron; Geraghty, Estella; Gabriel, Davera; Wynden, Rob; Kamerick, Michael; Anderson, Kent; Rainwater, Julie; Tarczy-Hornoch, Peter

    2011-01-01

    Objective The Cross-Institutional Clinical Translational Research project explored a federated query tool and looked at how this tool can facilitate clinical trial cohort discovery by managing access to aggregate patient data located within unaffiliated academic medical centers. Methods The project adapted software from the Informatics for Integrating Biology and the Bedside (i2b2) program to connect three Clinical Translational Research Award sites: University of Washington, Seattle, University of California, Davis, and University of California, San Francisco. The project developed an iterative spiral software development model to support the implementation and coordination of this multisite data resource. Results By standardizing technical infrastructures, policies, and semantics, the project enabled federated querying of deidentified clinical datasets stored in separate institutional environments and identified barriers to engaging users for measuring utility. Discussion The authors discuss the iterative development and evaluation phases of the project and highlight the challenges identified and the lessons learned. Conclusion The common system architecture and translational processes provide high-level (aggregate) deidentified access to a large patient population (>5 million patients), and represent a novel and extensible resource. Enhancing the network for more focused disease areas will require research-driven partnerships represented across all partner sites. PMID:21873473

  1. Implementation of a deidentified federated data network for population-based cohort discovery.

    PubMed

    Anderson, Nicholas; Abend, Aaron; Mandel, Aaron; Geraghty, Estella; Gabriel, Davera; Wynden, Rob; Kamerick, Michael; Anderson, Kent; Rainwater, Julie; Tarczy-Hornoch, Peter

    2012-06-01

    The Cross-Institutional Clinical Translational Research project explored a federated query tool and looked at how this tool can facilitate clinical trial cohort discovery by managing access to aggregate patient data located within unaffiliated academic medical centers. The project adapted software from the Informatics for Integrating Biology and the Bedside (i2b2) program to connect three Clinical Translational Research Award sites: University of Washington, Seattle, University of California, Davis, and University of California, San Francisco. The project developed an iterative spiral software development model to support the implementation and coordination of this multisite data resource. By standardizing technical infrastructures, policies, and semantics, the project enabled federated querying of deidentified clinical datasets stored in separate institutional environments and identified barriers to engaging users for measuring utility. The authors discuss the iterative development and evaluation phases of the project and highlight the challenges identified and the lessons learned. The common system architecture and translational processes provide high-level (aggregate) deidentified access to a large patient population (>5 million patients), and represent a novel and extensible resource. Enhancing the network for more focused disease areas will require research-driven partnerships represented across all partner sites.

  2. Highway runoff stormwater management potential (HRSMP) site characterization using NASA public domain imagery.

    DOT National Transportation Integrated Search

    2016-04-01

    The focus of this research project was the development of geospatial technology (GST) methodology to : characterize and evaluate highway runoff stormwater management potential (HRSMP) sites in order to : reduce their impact on properties, save lives ...

  3. Development of Hydrogen Education Programs for Government Officials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baxter, Shannon; Keller, Russ

    1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site

  4. Innovation Technologies and Applications for Coastal Archaeological sites

    NASA Astrophysics Data System (ADS)

    Di Iorio, A.; Biliouris, D.; Guzinski, R.; Hansen, L. B.; Bagni, M.

    2015-04-01

    Innovation Technologies and Applications for Coastal Archaeological sites project (ITACA) aims to develop and test a management system for underwater archaeological sites in coastal regions. The discovering and monitoring service will use innovative satellite remote sensing techniques combined with image processing algorithms. The project will develop a set of applications integrated in a system pursuing the following objectives: - Search and location of ancient ship wrecks; - Monitoring of ship wrecks, ruins and historical artefacts that are now submerged; - Integration of resulting search and monitoring data with on-site data into a management tool for underwater sites; - Demonstration of the system's suitability for a service. High resolution synthetic aperture radar (TerraSAR-X, Cosmo-SkyMed) and multispectral satellite data (WorldView) will be combined to derive the relative bathymetry of the bottom of the sea up to the depth of 50 meters. The resulting data fusion will be processed using shape detection algorithms specific for archaeological items. The new algorithms, the physical modelling and the computational capabilities will be integrated into the Web-GIS, together with data recorded from surface (2D and 3D modelling) and from underwater surveys. Additional specific archaeological layers will be included into the WebGIS to facilitate the object identification through shape detection techniques and mapping. The system will be verified and validated through an extensive onground (sea) campaign carried out with both cutting edge technologies (side-scan sonar, multi beam echo sounder) and traditional means (professional scuba divers) in two test sites in Italy and Greece. The project is leaded by Planetek Hellas E.P.E. and include ALMA Sistemi sas for the "shape detection" and dissemination tasks, DHI-GRAS and Kell Srl for multispectral and SAR bathymetry. The complete consortium is composed by eleven partners and the project Kick-Off has been held in January 2014. The present contribution aims to present the project research achievements and finding at the mid-term review.

  5. Using focus groups to guide development of a public health Web site.

    PubMed

    Henner, Terry A; Charles, Patricia

    2002-01-01

    This paper explores a project funded through the National Network of Libraries of Medicine to enhance effective use of the Internet by public health professionals. The processes and outcome of an effort to develop a statewide Web site for public health professionals are described. A series of focus groups was conducted as a preliminary data-gathering tool to evaluate the information needs of the target population. Results of the focus group provided a valuable framework upon which to build a successful schema for Web site development.

  6. Project SUN (Students Understanding Nature)

    NASA Technical Reports Server (NTRS)

    Curley, T.; Yanow, G.

    1995-01-01

    Project SUN is part of NASA's 'Mission to Planet Earth' education outreach effort. It is based on development of low cost, scientifi- cally accurate instrumentation and computer interfacing, coupled with Apple II computers as dedicated data loggers. The project is com- prised of: instruments, interfacing, software, curriculum, a detailed operating manual, and a system of training at the school sites.

  7. Learning in Introductory E-Commerce: A Project-Based Teamwork Approach

    ERIC Educational Resources Information Center

    Ngai, Eric W. T.

    2007-01-01

    In this paper, we describe an e-commerce teamwork-based project designed and implemented at the Hong Kong Polytechnic University (PolyU) for undergraduate business and management students. The teaching objectives of this e-commerce project are to develop the students' knowledge and skills, such as in the use of e-commerce site building tools,…

  8. Through Shared Windows: Outreach Project for Infants, Toddlers, and Children with Developmental Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes activities and accomplishments of the Through Shared Windows (TSW) Outreach Project, a 4-year project at the University of New Mexico designed to improve services to young children with disabilities and their families. Three major outcomes were accomplished. First, a Web site was developed that focuses on observational…

  9. Computer Writing Skills for Limited English Proficiency Students: Project COMPUGRAFIA.LEP 1988-89. OREA Evaluation Section Report.

    ERIC Educational Resources Information Center

    Berney, Tomi D.; Keyes, Jose L.

    The Computer Writing Skills for Limited English Proficient Students (Project COMPUGRAFIA.LEP), bilingual special education classes totalling 375 Spanish-speaking students at 10 elementary schools in the Bronx, is evaluated. The project proposed to assist site teachers in developing appropriate lesson plans and effective teaching techniques and…

  10. Innovative Instruction in Higher Education: Thirty Exemplary Projects Conducted in Selected Institutions of Post-Secondary Education--State of Oregon.

    ERIC Educational Resources Information Center

    Harper, Ronald; And Others

    This manual reviews thirty projects selected by the Oregon Educational Coordinating Council (ECC) as exemplary in method, operation, and development. The projects are organized into 9 broad classifications: large group-small group alternatives, autotutorial programmed instruction, process centered, computer and simulation, on-site/field study,…

  11. Building Student-Centered Web Sites in the K12 Classroom.

    ERIC Educational Resources Information Center

    Hall, Alison; Basile, Brigitte

    This paper examines the process of constructing a student-centered World Wide Web site and provides recommendations for improving this process. In the project, preservice teachers instructed the fifth grade students about how to design and develop a Web site on weather. The topics of the sessions included Internet ethics, using the Web,…

  12. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  13. ToHajiilee Economic Development, Inc.(TEDI) Feasibility Study for Utility-Scale Solar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burpo, Rob

    2012-02-29

    To Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Caoncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viabilitymore » of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.« less

  14. Report: Acquisition Certifications Needed for Managers Overseeing Development of EPA’s Electronic Manifest System

    EPA Pesticide Factsheets

    Report #17-P-0029, November 7, 2016. Ineffective project oversight could cause project delays that prolong the EPA's ability to provide emergency responders with data about hazardous waste shipped between generators’ sites and waste management facilities.

  15. 75 FR 33769 - Manufacturing Extension Partnership (MEP) Availability of Funds for Projects To Develop and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-15

    ... to the long-term economic stability of the region. Please see the NIST MEP Web site, http://www.nist... region, and contribute to the long-term economic stability of the region. Competitive projects will use...

  16. Equations for estimating stand establishment, release, and thinning costs in the Lake States.

    Treesearch

    Jeffrey T. Olson; Allen L. Lundgren; Dietmar Rose

    1978-01-01

    Equations for estimating project costs for certain silvicultural treatments in the Lake States have been developed from project records of public forests. Treatments include machine site preparation, hand planting, aerial spraying, prescribed burning, manual release, and thinning.

  17. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understandingmore » of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.« less

  18. Evaluation and implementation of an improved methodology for earthquake ground response analysis : uniform treatment source, path and site effects.

    DOT National Transportation Integrated Search

    2008-12-01

    Shortly after the 1994 Northridge Earthquake, Caltrans geotechnical engineers charged with developing site-specific : response spectra for high priority California bridges initiated a research project aimed at broadening their perspective : from simp...

  19. 24 CFR 941.606 - Proposal.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Life cycle analysis. For new construction and substantial rehabilitation, the criteria to be used in equipping the proposed development with heating and cooling systems, which shall include a life-cycle cost... the proposed site, site plan, and neighborhood. (f) Market analysis. An analysis of the projected...

  20. Evaluation and application of regional turbidity-sediment regression models in Virginia

    USGS Publications Warehouse

    Hyer, Kenneth; Jastram, John D.; Moyer, Douglas; Webber, James S.; Chanat, Jeffrey G.

    2015-01-01

    Conventional thinking has long held that turbidity-sediment surrogate-regression equations are site specific and that regression equations developed at a single monitoring station should not be applied to another station; however, few studies have evaluated this issue in a rigorous manner. If robust regional turbidity-sediment models can be developed successfully, their applications could greatly expand the usage of these methods. Suspended sediment load estimation could occur as soon as flow and turbidity monitoring commence at a site, suspended sediment sampling frequencies for various projects potentially could be reduced, and special-project applications (sediment monitoring following dam removal, for example) could be significantly enhanced. The objective of this effort was to investigate the turbidity-suspended sediment concentration (SSC) relations at all available USGS monitoring sites within Virginia to determine whether meaningful turbidity-sediment regression models can be developed by combining the data from multiple monitoring stations into a single model, known as a “regional” model. Following the development of the regional model, additional objectives included a comparison of predicted SSCs between the regional model and commonly used site-specific models, as well as an evaluation of why specific monitoring stations did not fit the regional model.

  1. Central Atlantic regional ecological test site

    NASA Technical Reports Server (NTRS)

    Alexander, R. H.

    1972-01-01

    The work of the Central Atlantic Regional Ecological Test Site (CARETS) project is discussed. The primary aim of CARETS is to test the hypothesis that data from ERTS-A can be made an integral part of a regional land resources information system, encompassing both inventory of the resource base and monitoring of changes, along with their effects on the quality of the environment. Another objective of the project is to determine scaling factors for developing land use information and regional analysis for regions of any given size.

  2. Validation of Innovative Exploration Technologies for Newberry Volcano: Drill Site Location Map 2010

    DOE Data Explorer

    Jaffe, Todd

    2012-01-01

    Newberry seeks to explore "blind" (no surface evidence) convective hydrothermal systems associated with a young silicic pluton on the flanks of Newberry Volcano. This project will employ a combination of innovative and conventional techniques to identify the location of subsurface geothermal fluids associated with the hot pluton. Newberry project drill site location map 2010. Once the exploration mythology is validated, it can be applied throughout the Cascade Range and elsewhere to locate and develop “blind” geothermal resources.

  3. Hanford analytical sample projections FY 1998--FY 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Joyce, S.M.

    1998-02-12

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management,more » and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.« less

  4. Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wright, Bruce Albert

    The Aleutian Pribilof Islands Association was awarded a U.S. Department of Energy Tribal Energy Program grant (DE-EE0005624) for the Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (Project). The goal of the Project was to perform a feasibility study to determine if a tidal energy project would be a viable means to generate electricity and heat to meet long-term fossil fuel use reduction goals, specifically to produce at least 30% of the electrical and heating needs of the tribally-owned buildings in False Pass. The Project Team included the Aleut Region organizations comprised of the Aleutianmore » Pribilof Island Association (APIA), and Aleutian Pribilof Island Community Development Association (APICDA); the University of Alaska Anchorage, ORPC Alaska a wholly-owned subsidiary of Ocean Renewable Power Company (ORPC), City of False Pass, Benthic GeoScience, and the National Renewable Energy Laboratory (NREL). The following Project objectives were completed: collected existing bathymetric, tidal, and ocean current data to develop a basic model of current circulation at False Pass, measured current velocities at two sites for a full lunar cycle to establish the viability of the current resource, collected data on transmission infrastructure, electrical loads, and electrical generation at False Pass, performed economic analysis based on current costs of energy and amount of energy anticipated from and costs associated with the tidal energy project conceptual design and scoped environmental issues. Utilizing circulation modeling, the Project Team identified two target sites with strong potential for robust tidal energy resources in Isanotski Strait and another nearer the City of False Pass. In addition, the Project Team completed a survey of the electrical infrastructure, which identified likely sites of interconnection and clarified required transmission distances from the tidal energy resources. Based on resource and electrical data, the Project Team developed a conceptual tidal energy project design utilizing ORPC’s TidGen® Power System. While the Project Team has not committed to ORPC technology for future development of a False Pass project, this conceptual design was critical to informing the Project’s economic analysis. The results showed that power from a tidal energy project could be provided to the City of False at a rate at or below the cost of diesel generated electricity and sold to commercial customers at rates competitive with current market rates, providing a stable, flat priced, environmentally sound alternative to the diesel generation currently utilized for energy in the community. The Project Team concluded that with additional grants and private investment a tidal energy project at False Pass is well-positioned to be the first tidal energy project to be developed in Alaska, and the first tidal energy project to be interconnected to an isolated micro grid in the world. A viable project will be a model for similar projects in coastal Alaska.« less

  5. Applications of ecological concepts and remote sensing technologies in archaeological site reconnaissance

    NASA Technical Reports Server (NTRS)

    Miller, W. Frank; Sever, Thomas L.; Lee, C. Daniel

    1991-01-01

    The concept of integrating ecological perspectives on early man's settlement patterns with advanced remote sensing technologies shows promise for predictive site modeling. Early work with aerial imagery and ecosystem analysis is discussed with respect to the development of a major project in Maya archaeology supported by NASA and the National Geographic Society with technical support from the Mississippi State Remote Sensing Center. A preliminary site reconnaissance model will be developed for testing during the 1991 field season.

  6. Site characterization progress report: Yucca Mountain, Nevada, October 1, 1994--March 31, 1995, Number 12. Nuclear Waste Policy Act (Section 113)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less

  7. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision onmore » building a new nuclear power plant at the North Anna site.« less

  8. Development of Guidelines for Reduction of Temperature Differential Damage (TDD) for Hot Mix Asphalt Pavement Projects in Connecticut

    DOT National Transportation Integrated Search

    1999-11-01

    Connecticut Department of Transportation personnel used an infrared camera to observe thermal segregation of hot mix asphalt during pavement construction. Several sites were selected for study from ongoing paving projects. During paving operations, t...

  9. Environmental surveillance master sampling schedule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bisping, L.E.

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of themore » onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.« less

  10. Offsets and conservation of the species of the EU habitats and birds directives.

    PubMed

    Regnery, Baptiste; Couvet, Denis; Kerbiriou, Christian

    2013-12-01

    Biodiversity offsets are intended to achieve no net loss of biodiversity due to economic and human development. A variety of biodiversity components are addressed by offset policies. It is required that loss of protected species due to development be offset under the EU Habitats and Birds Directives in Europe. We call this type of offset a species-equality offset because the offset pertains to the same species affected by the development project. Whether species equality can be achieved by offset design is unknown. We addressed this gap by reviewing derogation files (i.e., specific files that describe mitigation measures to ensure no net loss under the EU Habitats and Birds Directives) from 85 development projects in France (2009-2010). We collected information on type of effect (reversible vs. irreversible) and characteristics of affected and offset sites (i.e., types of species, total area). We analyzed how the type of effect and the affected-site characteristics influenced the occurrence of offset measures. The proportion of species targeted by offset measures (i.e., offset species) increased with the irreversibility of the effect of development and the conservation status of the species affected by development (i.e., affected species). Not all effects on endangered species (International Union for Conservation of Nature Red List) were offset; on average, 82% of affected species would be offset. Twenty-six percent of species of least concern were offset species. Thirty-five percent of development projects considered all affected species in their offset measures. Species richness was much lower in offset sites than in developed sites even after offset proposals. For developed areas where species richness was relatively high before development, species richness at offset sites was 5-10 times lower. The species-equality principle appears to have been applied only partially in offset policies, as in the EU directives. We suggest the application of this principle through offsets is highly important for the long-term conservation of biodiversity in Europe. Compensaciones y Conservación de las Especies de las Directivas de Hábitats y Aves de la UE. © 2013 Society for Conservation Biology.

  11. Technology Diffusion. [SITE 2002 Section].

    ERIC Educational Resources Information Center

    Niederhauser, Dale S., Ed.; Strudler, Neal, Ed.

    This document contains the following papers on technology diffusion from the SITE (Society for Information Technology & Teacher Education) 2002 conference: (1) "Faculty Technology Integration Project" (Comfort Akwaji); (2) "If It Is Broke, Then What?" (D. Lynnwood Belvin and Jennifer Leaderer); (3) "Developing Video-Based E-Learning Applications"…

  12. RISK ASSESSMENT/RISK MANAGEMENT AND COMMUNICATION FOR BROWNFIELDS REDEVELOPMENT DECISION MAKING

    EPA Science Inventory

    Brownfields redevelopment is an integrated process which involves individuals from varied disciplines and with widely varied interest in the project. it involves a group of developers, their financial backers, the local governments who permit the redevelopment of the site or site...

  13. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development IV: Fish Mortality Resulting From Turbine Passage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turbak, Susan C.; Reichle, Donna R.; Shriner, Carole R.

    1981-01-01

    The purpose of this report is to provide summary information for use by potential developers and regulators of small-scale hydroelectric projects (defined as existing dams that can be retrofitted to a total site capacity of ≤30 MW), where turbine-related mortality of fish is a potential issue affecting site-specific development. Mitigation techniques for turbine-related mortality are not covered in this report.

  14. Report on Discussions of the Task Force on the Manpower Distribution Project of the National Health Council.

    ERIC Educational Resources Information Center

    National Health Council, New York, NY.

    Twenty-six health manpower experts met to: (1) recommend criteria for selecting proposals for local/regional demonstration projects; (2) recommend criteria for selection of areas or sites in which to implement demonstration projects, and (3) develop guidelines for a national program to involve the health professions in alleviating the problem of…

  15. Finding the Way: Improving Access to the Collections of the Royal Scottish Geographical Society

    ERIC Educational Resources Information Center

    Fenton, Candida

    2007-01-01

    Purpose: The purpose of this paper is to describe the Images for All digitisation project at the Royal Scottish Geographical Society, and lessons learned from it. Design/methodology/approach: This paper describes the background to the project and collections held. It focuses on the development of the project web site, the digitisation of 100…

  16. Evaluating Systemic Change in the National Head Start-Public School Transition Project: Perspectives from Five States.

    ERIC Educational Resources Information Center

    Greene, Andrea; And Others

    In 1991 the Department of Health and Human Services funded 32 sites throughout the United States to develop and implement Head Start-Public School Early Childhood Transition Demonstration Projects. The purpose of 31 projects, which are in their fourth year of operation, is to stimulate partnerships among Head Start agencies, public schools, and…

  17. Project X: competitive intelligence data mining and analysis

    NASA Astrophysics Data System (ADS)

    Gilmore, John F.; Pagels, Michael A.; Palk, Justin

    2001-03-01

    Competitive Intelligence (CI) is a systematic and ethical program for gathering and analyzing information about your competitors' activities and general business trends to further your own company's goals. CI allows companies to gather extensive information on their competitors and to analyze what the competition is doing in order to maintain or gain a competitive edge. In commercial business this potentially translates into millions of dollars in annual savings or losses. The Internet provides an overwhelming portal of information for CI analysis. The problem is how a company can automate the translation of voluminous information into valuable and actionable knowledge. This paper describes Project X, an agent-based data mining system specifically developed for extracting and analyzing competitive information from the Internet. Project X gathers CI information from a variety of sources including online newspapers, corporate websites, industry sector reporting sites, speech archiving sites, video news casts, stock news sites, weather sites, and rumor sites. It uses individual industry specific (e.g., pharmaceutical, financial, aerospace, etc.) commercial sector ontologies to form the knowledge filtering and discovery structures/content required to filter and identify valuable competitive knowledge. Project X is described in detail and an example competitive intelligence case is shown demonstrating the system's performance and utility for business intelligence.

  18. Portfolio Analysis of Renewable Energy Opportunities: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richards, Allison; Deprizio, Jodi; Anderson, Kate

    Time Warner Cable (TWC), now Charter Communications (CC), partnered with the National Renewable Energy Laboratory (NREL) to assess the technical and economic potential for solar photovoltaic (PV), wind, and ground-source heat-pump systems at 696 TWC facilities. NREL identified 306 sites where adding a renewable energy system would provide cost savings over the project life-cycle. In general, the top sites have some combination of high electricity rates ($0.16-$0.29/kWh), significant state incentives, and favorable net-metering policies. If all projects were implemented via third-party power purchase agreements, TWC/CC would save $37 million over 25 years and meet 10.5% of their energy consumption withmore » renewable energy. This paper describes the portfolio screening methodology used to identify and prioritize renewable energy opportunities across the TWC sites, as well as a summary of the potential cost savings that may be realized by implementing these projects. This may provide a template for other companies interested in identifying and prioritizing renewable energy opportunities across a large number of geographically dispersed sites. Following this initial portfolio analysis, NREL will be conducting in-depth analysis of project development opportunities at ten sites and evaluating off-grid solutions that may enable carbon emission reduction and grid independence at select facilities.« less

  19. Continued Development and Dissemination of Materials for Serving Senior Adults. FY '83 310 Project Final Report.

    ERIC Educational Resources Information Center

    Northwest Iowa Technical Coll., Sheldon.

    A project was conducted in Iowa to develop educational programs for older adults who were not institutionalized. Focus of the activity was on sites that held community meals for the aging on a daily basis. Those who attended were targeted for after-dinner educational programs. A survey was taken of the interests of the senior citizens attending…

  20. The book, the stories, the people: an ongoing dialogic narrative inquiry study combining a practice development project. Part 2: the practice development context.

    PubMed

    Grant, A; Biley, F C; Leigh-Phippard, H; Walker, H

    2012-12-01

    This paper is the second part of a two-article practice development report. It builds on the first part by introducing and discussing a Writing for Recovery practice development project, conducted at two UK sites. The paper begins by briefly describing the project within the context of helping mental health users, carers and survivors develop skills in creative writing in order to engage in the process of narrative re-storying in line with preferred identity. A selective overview of broad and focal background literature relevant to the project is then provided in order to position it within a values-based mental health nursing practice. Following this, the specific plan for running the project is briefly summarized, covering actual and anticipated ethical issues. The paper ends with a discussion of dissemination aims. © 2012 Blackwell Publishing.

  1. 3D Seismic Experimentation and Advanced Processing/Inversion Development for Investigations of the Shallow Subsurface

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levander, Alan Richard; Zelt, Colin A.

    2015-03-17

    The work plan for this project was to develop and apply advanced seismic reflection and wide-angle processing and inversion techniques to high resolution seismic data for the shallow subsurface to seismically characterize the shallow subsurface at hazardous waste sites as an aid to containment and cleanup activities. We proposed to continue work on seismic data that we had already acquired under a previous DoE grant, as well as to acquire additional new datasets for analysis. The project successfully developed and/or implemented the use of 3D reflection seismology algorithms, waveform tomography and finite-frequency tomography using compressional and shear waves for highmore » resolution characterization of the shallow subsurface at two waste sites. These two sites have markedly different near-surface structures, groundwater flow patterns, and hazardous waste problems. This is documented in the list of refereed documents, conference proceedings, and Rice graduate theses, listed below.« less

  2. The commerce Clause and transmission infrastructure development: an answer to jurisdictional issues clouded by protectionism

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snarr, Steven W.

    2009-06-15

    Siting authority for interstate transmission facilities needs to rest with one federal agency, FERC, and federal eminent domain authority should be granted to those projects that meet the certification requirements of the siting authority. Establishment of a national renewable portfolio standard would be helpful to promote development of both renewable energy resources and cleaner power alternatives. (author)

  3. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  4. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  5. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  6. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  7. 42 CFR 137.335 - What costs may be included in the budget for a construction agreement?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... oversight of the design during construction; (4) Real property lease or acquisition; (5) Development of project surveys including topographical surveys, site boundary descriptions, geotechnical surveys, archeological surveys, and NEPA compliance; (6) Project management, superintendence, safety and inspection; (7...

  8. 24 CFR 51.305 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.305 Implementation. (a) Projects... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Implementation. 51.305 Section 51...

  9. 24 CFR 51.305 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.305 Implementation. (a) Projects... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Implementation. 51.305 Section 51...

  10. 24 CFR 51.305 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.305 Implementation. (a) Projects... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Implementation. 51.305 Section 51...

  11. 24 CFR 51.305 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.305 Implementation. (a) Projects... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Implementation. 51.305 Section 51...

  12. 24 CFR 51.305 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... ENVIRONMENTAL CRITERIA AND STANDARDS Siting of HUD Assisted Projects in Runway Clear Zones at Civil Airports and Clear Zones and Accident Potential Zones at Military Airfields § 51.305 Implementation. (a) Projects... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Implementation. 51.305 Section 51...

  13. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  14. Video Cases. [SITE 2002 Section].

    ERIC Educational Resources Information Center

    Talley, Sue, Ed.

    This document contains the following papers on video case studies from the SITE (Society for Information Technology & Teacher Education) 2002 conference: (1) "Developing Digital Video Resources To Improve Teaching with Technology: The PT3--'Best Practices' Project"; (2) "Portraits of Three Schools from the U.S.A. Exemplary Technology-Supported…

  15. SCHOOL SITES. SELECTION AND DEVELOPMENT.

    ERIC Educational Resources Information Center

    REIDA, G.W.

    CERTAIN CRITICAL CRITERIA SHOULD BE CONSIDERED IN SELECTING THE SCHOOL SITE. IMPORTANT IS THE STUDY OF SUCH FACTORS AS PRESENT AND PROJECTED PUPIL POPULATION, THE SCHOOL MASTER PLAN, MAIN THOROUGHFARES, DWELLINGS, LAND USE, SOILS, (SHOWN BY SERVICE MAPS), EXISTING SCHOOL FACILITIES AND ATTENDANCE, BOUNDARIES, UTILITY SERVICES AND FLOOD CONTROLS.…

  16. Gas Hydrate Research Site Selection and Operational Research Plans

    NASA Astrophysics Data System (ADS)

    Collett, T. S.; Boswell, R. M.

    2009-12-01

    In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a comprehensive set of logging-while-drilling (LWD) data through expected gas-hydrate-bearing sand reservoirs in seven wells at three sites in the Gulf of Mexico. The discovery of thick hydrate-bearing sands at two of the sites drilled in the Gulf Mexico validated the integrated geological and geophysical approach used in the pre-drill site selection process to identify gas hydrate reservoirs that may be conducive to energy production. The results of the GOM JIP Leg II LWD expedition are also being used to support the selection of sites for a future drilling, logging, and coring program. Operationally, recent drilling programs, such as ODP Leg 204, IODP Expedition 311, the Japanese Toaki-oki to Kumano-nada drilling leg, the Indian NGHP Expedition 01, and the South Korean Gas Hydrate Research and Development Organization Expedition 01 have demonstrated the great benefit of a multi-leg drilling approach, including the initial acquisition of LWD data that was used to then select sites for the drilling of complex core and wireline logging test holes. It is obvious that a fully integrated site selection approach and a “goal based” operational plan, possibly including numerous drill sites and drilling legs, are required considerations for any future gas hydrate research project.

  17. Web-based technical assistance and training to promote community tobacco control policy change.

    PubMed

    Young, Walter F; Montgomery, Debbie; Nycum, Colleen; Burns-Martin, Lavon; Buller, David B

    2006-01-01

    In 1998 the tobacco industry was released of claims that provided monetary relief for states. A significant expansion of tobacco control activity in many states created a need to develop local capacity. Technical assistance and training for new and experienced staff became a significant challenge for tobacco control leadership. In Colorado, this challenge was addressed in part through the development of a technical assistance and training Web site designed for local tobacco control staff and coalition members. Researchers, technical Web site development specialists, state health agency, and state tobacco control coalition staff collaborated to develop, promote, and test the efficacy of this Web site. The work group embodied a range of skills including tobacco control, Web site technical development, marketing, training, and project management. Persistent marketing, updating of Web site content, and institutionalizing it as a principal source of information and training were key to use by community coalition members.

  18. Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daley, Thomas M.; Vasco, Don; Ajo-Franklin, Jonathan

    After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storagemore » (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.« less

  19. Prioritizing High-Temperature Geothermal Resources in Utah

    USGS Publications Warehouse

    Blackett, R.E.; Brill, T.C.; Sowards, G.M.

    2002-01-01

    The Utah Geological Survey and the Utah Energy Office recently released geothermal resource information for Utah as a "digital atlas." We are now expanding this project to include economic analyses of selected geothermal sites and previously unavailable resource information. The enhancements to the digital atlas will include new resource, demographic, regulatory, economic, and other information to allow analyses of economic factors for comparing and ranking geothermal resource sites in Utah for potential electric power development. New resource information includes temperature gradient and fluid chemistry data, which was previously proprietary. Economic analyses are based upon a project evaluation model to assess capital and operating expenses for a variety of geothermal powerplant configuration scenarios. A review of legal and institutional issues regarding geothermal development coupled with water development will also be included.

  20. Developing a model of midwifery mentorship for Uganda: The MOMENTUM project 2015-2017.

    PubMed

    Kemp, Joy; Shaw, Eleanor; Musoke, Mary Gorret

    2018-04-01

    MOMENTUM was a 20 month midwifery twinning project between the Royal College of Midwives UK and the Ugandan Private Midwives Association. It ran from 2015-2017 and was funded by UK-Aid through THET. MOMENTUM aimed to develop a model of mentorship for Ugandan midwifery students. The project achieved its objectives. 41 Ugandan midwives were trained as mentors following a work-based learning curriculum. 142 student midwives from 8 midwifery schools received mentorship in 7 participating clinical sites. All sites showed measured improvement in the clinical learning environment. 7 UK midwives were twinned with Ugandan counterparts and engaged in peer-exchange visits and virtual support via smart-phones. The model is context-specific and may not be replicable in other countries or professions. However it will inform midwifery education in the UK and elsewhere. Copyright © 2018 Elsevier Ltd. All rights reserved.

  1. Quantitative evidence for the benefits of Moving the Goalposts, a Sport for Development project in rural Kenya.

    PubMed

    Woodcock, Alison; Cronin, Órla; Forde, Sarah

    2012-08-01

    Sport for Development has many reported benefits, but quantitative evidence of the impact of these interventions in Low Income Countries remains sparse. A new monitoring and evaluation toolkit was used in a cross-sectional survey at Moving the Goalposts (MTG), a football project aiming to empower young Kenyan women. We wished to determine empirically whether increased membership duration brought increased benefits. MTG selected and translated toolkit items consistent with the organisation's strategic aims. We collected 333 completed questionnaires at 15 sites. Psychometric validation revealed some reliable scales; remaining items were scored separately. Scores were sensitive to differences between members defined by sociodemographic and site characteristics. Bivariate and multiple regression analyses showed that increased membership duration brought increasing benefits across several domains (perceived lifeskills; social life; insights about HIV/AIDS; outcomes related to female empowerment). Improved leadership skills were mainly age-related. Members attending more established sites experienced greater benefits, but members at more and less accessible sites benefitted similarly. Positive thoughts and feelings were related not to membership duration, but to how long a site had been operating. This indicates the importance of creating a positive culture over time. This cross-sectional study provides quantitative evidence for the benefits of Sport for Development initiatives. Copyright © 2012 Elsevier Ltd. All rights reserved.

  2. Baseline data for evaluating development trajectory and provision of ecosystem services of created fringing oyster reefs in Vermilion Bay, Louisiana

    USGS Publications Warehouse

    La Peyre, Megan K.; Schwarting, Lindsay; Miller, Shea

    2013-01-01

    Understanding the time frame in which ecosystem services (that is, water quality maintenance, shoreline protection, habitat provision) are expected to be provided is important when restoration projects are being designed and implemented. Restoration of three-dimensional shell habitats in coastal Louisiana and elsewhere presents a valuable and potentially self-sustaining approach to providing shoreline protection, enhancing nekton habitat, and providing water quality maintenance. As with most restoration projects, the development of expected different ecosystem services often occurs over varying time frames, with some services provided immediately and others taking longer to develop. This project was designed initially to compare the provision and development of ecosystem services by created fringing shoreline reefs in subtidal and intertidal environments in Vermilion Bay, Louisiana. Specifically, the goal was to test the null hypothesis that over time, the oyster recruitment and development of a sustainable oyster reef community would be similar at both intertidal and subtidal reef bases, and these sustainable reefs would in time provide similar shoreline stabilization, nekton habitat, and water quality services over similar time frames. Because the ecosystem services hypothesized to be provided by oyster reefs reflect long-term processes, fully testing the above-stated null hypothesis requires a longer-time frame than this project allowed. As such, this project was designed to provide the initial data on reef development and provision of ecosystem services, to identify services that may develop immediately, and to provide baseline data to allow for longer-term follow up studies tracking reef development over time. Unfortunately, these initially created reef bases (subtidal, intertidal) were not constructed as planned because of the Deepwater Horizon oil spill in April 2010, which resulted in reef duplicates being created 6 months apart. Further confounding the project were additional construction and restoration projects along the same shorelines which occurred between 2011 and June 2012. Because of constant activity near and around the reefs and continuing construction, development trajectories could not be compared among reef types at this time. This report presents the data collected at the sites over 3 years (2010–2012), describing only conditions and trends. In addition, these data provide an extensive and detailed dataset documenting initial conditions and initial ecosystem changes which will prove valuable in future data collection and analyses of reef development at this site. Data collection characterized the local water quality conditions (salinity, temperature, total suspended sediments, dissolved oxygen, chlorophyll a), adjacent marsh vegetation, soils, and shoreline position along the project shoreline at Vermilion Bay. During the study, marsh vegetation and soil characteristics were similar across the study area and did not change over time. Shoreline movement indicated shoreline loss at all sites, which varied by reefs. Water quality conditions followed expected seasonal patterns for this region, and no significant nonseasonal changes were measured throughout the study period. Despite oyster recruitment in fall 2010 and 2011, few if any oysters survived from the 2010 year class to 2012. At the last sampling of this project, some oysters recruited in fall 2011 survived through 2012, resulting in an on-reef density of 18.3 ± 2.1 individuals per square meter (mean size: 85.6 ± 2.2 millimeters). Because project goals were to compare reef development and provision of ecosystem services over time, as well as many of the processes identified for monitoring reflect long-term processes, results and data are presented only qualitatively, and trends or observations should be interpreted cautiously at this point. Measurable system responses to reef establishment require more time than was available for this study. These data provide a valuable baseline that can be ultimately used to help inform site selections for future restoration projects as well to further investigate the development trajectories of ecosystem provision of created reefs in this region.

  3. The Urbis Project: Identification and Characterization of Potential Urban Development Areas as a Web-Based Service

    NASA Astrophysics Data System (ADS)

    Manzke, Nina; Kada, Martin; Kastler, Thomas; Xu, Shaojuan; de Lange, Norbert; Ehlers, Manfred

    2016-06-01

    Urban sprawl and the related landscape fragmentation is a Europe-wide challenge in the context of sustainable urban planning. The URBan land recycling Information services for Sustainable cities (URBIS) project aims for the development, implementation, and validation of web-based information services for urban vacant land in European functional urban areas in order to provide end-users with site specific characteristics and to facilitate the identification and evaluation of potential development areas. The URBIS services are developed based on open geospatial data. In particular, the Copernicus Urban Atlas thematic layers serve as the main data source for an initial inventory of sites. In combination with remotely sensed data like SPOT5 images and ancillary datasets like OpenStreetMap, detailed site specific information is extracted. Services are defined for three main categories: i) baseline services, which comprise an initial inventory and typology of urban land, ii) update services, which provide a regular inventory update as well as an analysis of urban land use dynamics and changes, and iii) thematic services, which deliver specific information tailored to end-users' needs.

  4. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  5. Anesthesia and the role of short-term service delivery in developing countries.

    PubMed

    Froese, Alison

    2007-11-01

    To clarify the ongoing need for involvement of anesthesiologists in short-term surgical projects in developing countries, and provide information to guide the selection of, application for, and preparation for these rewarding experiences. The lack of safe anesthesia services severely limits the performance of needed surgical procedures in developing countries around the world. Even in countries where well-trained anesthesiologists are available in major urban centres, resources are often absent or limited for large numbers of people in rural or remote areas. Anesthesiologists are highly sought members of surgical teams. Internet sites provide extensive project information. Projects occur in Central and South America, Africa, Asia and Eastern Europe. Projects can bring specialized surgical expertise to an otherwise well-serviced urban area, or work in remote areas that have surgical services only when a team comes. Available equipment, drugs, housing, food and transportation vary markedly with project site. Flexibility, adaptability and problem-solving skills are essential. Translators provide language assistance. Anesthesiologists who have experience providing anesthetics in settings with less technological support can assist other anesthesiologists in adapting to less sophisticated settings. Severe shortages of trained health professionals plague developing countries, reflecting complex economic and political problems that will require decades for resolution. Until such time as surgical services are widely available and affordable in remote as well as urban areas of developing countries, anesthesiologists will continue to provide a valuable and personally rewarding contribution through short-term assistance.

  6. What kind of scientific observations can we still doing with a small ground-based telescopes? Case Study of Oukaimeden Observatory

    NASA Astrophysics Data System (ADS)

    Benkhaldoun, Zouhair

    2015-08-01

    We propose to discuss the issue based on the experience gained at the Oukaimeden Observatory since 1988. Indeed, during the past few years, this observatory located in the Moroccan High Atlas, is experiencing a substantial rise in term of scientific work. After being selected in the last 80’s, for a solar helioseismology experiment (IRIS Experiment) and having been the subject of several site testing campaigns, it is quickly becoming one of the most important sky surveyor in the region, and beyond.It has in fact proven, especially thanks to its very good seeing and recent discoveries of comets and near-Earth asteroids, that we still need to invest in observation from the ground with instruments of modest size and costs. The site has a median seeing of about 0.9 arcsec with frequent peaks at 0.5-0.6 arcsec. It has very good climate statistics especially in terms of the number of good photometrical night (280 per year).In this work, we propose to review the qualities of the site of the Oukaimeden observatory, the projects that have been developed, the projects under development and finally the potential it represents for the community to turn it into a unique observation location in the region. We will also present some scientific results from various programs previously developed, as well as projections on the basis of projects currently discussed.

  7. DEVELOPMENT OF REAL-TIME SITE-SPECIFIC MICROSCALE EMISSION FACTOR MODEL FOR THE ASSESSMENT OF HUMAN EXPOSURE TO MOTOR VEHICLE EMISSIONS

    EPA Science Inventory

    The United States Environmental Protection Agency's (EPA) National Expsoure Research Laboratory (NERL) has initiated a project to improve the methodology for modeling urban-scale human exposure to mobile source emissions. The modeling project has started by considering the nee...

  8. NREL Suite of Tools for PV and Storage Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elgqvist, Emma M; Salasovich, James A

    Many different factors such as the solar resource, technology costs and incentives, utility cost and consumption, space available, and financial parameters impact the technical and economic potential of a PV project. NREL has developed techno-economic modeling tools that can be used to evaluate PV projects at a site.

  9. 24 CFR 200.72 - Zoning, deed and building restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Zoning, deed and building... Zoning, deed and building restrictions. The project when completed shall not violate any material zoning or deed restrictions applicable to the project site, and shall comply with all applicable building...

  10. Interoperability of Demand Response Resources Demonstration in NY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wellington, Andre

    2014-03-31

    The Interoperability of Demand Response Resources Demonstration in NY (Interoperability Project) was awarded to Con Edison in 2009. The objective of the project was to develop and demonstrate methodologies to enhance the ability of customer sited Demand Response resources to integrate more effectively with electric delivery companies and regional transmission organizations.

  11. Project UPSTART. Final Report, October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    Frain, Joan

    Project UPSTART, during this fourth year of outreach, offered assistance in replicating its developed Sequenced Neuro-Sensorimotor Program (SNSP) for severely multihandicapped infants, pre-schoolers, young adults and their families. Future replication sites were identified. Programs received outreach assistance in the areas of staff training,…

  12. 24 CFR 242.45 - Early commencement of work.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Early commencement of work. 242.45... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.45 Early commencement of work. (a) Site preparation... commencement of certain limited site preparation for the project within legal guidelines and state law. Such...

  13. 24 CFR 242.45 - Early commencement of work.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Early commencement of work. 242.45... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.45 Early commencement of work. (a) Site preparation... commencement of certain limited site preparation for the project within legal guidelines and state law. Such...

  14. 24 CFR 242.45 - Early commencement of work.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Early commencement of work. 242.45... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.45 Early commencement of work. (a) Site preparation... commencement of certain limited site preparation for the project within legal guidelines and state law. Such...

  15. Professional Development for Occupational Specialist: Occupational Competency Testing. Final Report.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN.

    The organization, scope, and activities of the Indiana Occupational Competency Testing Center were expanded to accommodate the requirements of the new Occupational Specialist Certificate for secondary vocational teacher credentialling. A pilot project involved three regional sites in the state. The director of the host area site acted as area…

  16. An Online Resource Site for Extension Master Gardener Coordinators

    ERIC Educational Resources Information Center

    Langellotto, Gail Ann; Dorn, Sheri

    2016-01-01

    Developing an online resource site for Extension master gardener (EMG) coordinators is an ongoing project for Extension collaborators. Begun in 2014, the website includes peer-reviewed resources focused on best practices in volunteer management and program administration. The website is organized according to nine resource categories (e.g.,…

  17. Brief reconnaissance study for the addition of hydropower for Lake Manatee Dam, Bradenton, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gebhard, T.G. Jr.

    1983-02-24

    The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It was concluded that the development of hydroelectric power at this site does not appear to be economically feasible. (MHR)

  18. Assessment of the Appalachian Basin Geothermal Field: Combining Risk Factors to Inform Development of Low Temperature Projects

    NASA Astrophysics Data System (ADS)

    Smith, J. D.; Whealton, C.; Camp, E. R.; Horowitz, F.; Frone, Z. S.; Jordan, T. E.; Stedinger, J. R.

    2015-12-01

    Exploration methods for deep geothermal energy projects must primarily consider whether or not a location has favorable thermal resources. Even where the thermal field is favorable, other factors may impede project development and success. A combined analysis of these factors and their uncertainty is a strategy for moving geothermal energy proposals forward from the exploration phase at the scale of a basin to the scale of a project, and further to design of geothermal systems. For a Department of Energy Geothermal Play Fairway Analysis we assessed quality metrics, which we call risk factors, in the Appalachian Basin of New York, Pennsylvania, and West Virginia. These included 1) thermal field variability, 2) productivity of natural reservoirs from which to extract heat, 3) potential for induced seismicity, and 4) presence of thermal utilization centers. The thermal field was determined using a 1D heat flow model for 13,400 bottomhole temperatures (BHT) from oil and gas wells. Steps included the development of i) a set of corrections to BHT data and ii) depth models of conductivity stratigraphy at each borehole based on generalized stratigraphy that was verified for a select set of wells. Wells are control points in a spatial statistical analysis that resulted in maps of the predicted mean thermal field properties and of the standard error of the predicted mean. Seismic risk was analyzed by comparing earthquakes and stress orientations in the basin to gravity and magnetic potential field edges at depth. Major edges in the potential fields served as interpolation boundaries for the thermal maps (Figure 1). Natural reservoirs were identified from published studies, and productivity was determined based on the expected permeability and dimensions of each reservoir. Visualizing the natural reservoirs and population centers on a map of the thermal field communicates options for viable pilot sites and project designs (Figure 1). Furthermore, combining the four risk factors at favorable sites enables an evaluation of project feasibility across sites based on tradeoffs in the risk factors. Uncertainties in each risk factor can also be considered to determine if the tradeoffs in risk factors between sites are meaningful.

  19. A Cost Comparison of Alternative Approaches to Distance Education in Developing Countries

    NASA Technical Reports Server (NTRS)

    Ventre, Gerard G.; Kalu, Alex

    1996-01-01

    This paper presents a cost comparison of three approaches to two-way interactive distance learning systems for developing countries. Included are costs for distance learning hardware, terrestrial and satellite communication links, and designing instruction for two-way interactive courses. As part of this project, FSEC is developing a 30-hour course in photovoltaic system design that will be used in a variety of experiments using the Advanced Communications Technology Satellite (ACTS). A primary goal of the project is to develop an instructional design and delivery model that can be used for other education and training programs. Over two-thirds of the world photovoltaics market is in developing countries. One of the objectives of this NASA-sponsored project was to develop new and better energy education programs that take advantage of advances in telecommunications and computer technology. The combination of desktop video systems and the sharing of computer applications software is of special interest. Research is being performed to evaluate the effectiveness of some of these technologies as part of this project. The design of the distance learning origination and receive sites discussed in this paper were influenced by the educational community's growing interest in distance education. The following approach was used to develop comparative costs for delivering interactive distance education to developing countries: (1) Representative target locations for receive sites were chosen. The originating site was assumed to be Cocoa, Florida, where FSEC is located; (2) A range of course development costs were determined; (3) The cost of equipment for three alternative two-way interactive distance learning system configurations was determined or estimated. The types of system configurations ranged from a PC-based system that allows instructors to originate instruction from their office using desktop video and shared application software, to a high cost system that uses a electronic classroom; (4) A range of costs for both satellite and terrestrial communications was investigated; (5) The costs of equipment and operation of the alternative configurations for the origination and receive sites were determined; (6) A range of costs for several alternative delivery scenarios (i.e., a mix of live-interactive; asynchronous interactive;use of videotapes) was determined; and (7) A preferred delivery scenario, including cost estimate, was developed.

  20. Development of Water Resources in Appalachia. Main Report. Part 2. Volume 5a. Sub-Regional Plans. Chapters 13 thru 16

    DTIC Science & Technology

    1969-11-01

    Aepetee Alto to Ciae Lake 411 Nthikng slt. Formp 62 Rosts ife Lake 45 LOkt Steno L at 44 14rek.e Lest REPORT FOR P4KLPel KS Tycoee Leka DEVELOPMENT OF...camp sites and group camp use. The Summersville project is located in the Kanawha River Basin, on Gauley River near Summersville in Nicholas County, West...miles of channel snagging and clearing. 11-13-39 The Richwood, West Virginia Project is located on Cherry River in Nicholas County. The project

  1. Development of a web geoservices platform for School of Environmental Sciences, Mahatma Gandhi University, Kerala, India

    NASA Astrophysics Data System (ADS)

    Satheendran, S.; John, C. M.; Fasalul, F. K.; Aanisa, K. M.

    2014-11-01

    Web geoservices is the obvious graduation of Geographic Information System in a distributed environment through a simple browser. It enables organizations to share domain-specific rich and dynamic spatial information over the web. The present study attempted to design and develop a web enabled GIS application for the School of Environmental Sciences, Mahatma Gandhi University, Kottayam, Kerala, India to publish various geographical databases to the public through its website. The development of this project is based upon the open source tools and techniques. The output portal site is platform independent. The premier webgis frame work `Geomoose' is utilized. Apache server is used as the Web Server and the UMN Map Server is used as the map server for this project. It provides various customised tools to query the geographical database in different ways and search for various facilities in the geographical area like banks, attractive places, hospitals, hotels etc. The portal site was tested with the output geographical database of 2 projects of the School such as 1) the Tourism Information System for the Malabar region of Kerala State consisting of 5 northern districts 2) the geoenvironmental appraisal of the Athirappilly Hydroelectric Project covering the entire Chalakkudy river basin.

  2. Teachers' Assessments of Professional Development Quality, Value, and Benefits: Results from Seven Annual Surveys of Participants in National Writing Project Summer Institutes

    ERIC Educational Resources Information Center

    Stokes, Laura; St. John, Mark

    2008-01-01

    The National Writing Project (NWP) is the nation's premier professional development network dedicated to improving the teaching of writing. The NWP network comprises nearly 200 local sites in all 50 states, Puerto Rico, and the Virgin Islands. This report presents the results of a seven-year survey study of teachers participating in NWP summer…

  3. The human factor in mining reclamation

    USGS Publications Warehouse

    Arbogast, Belinda F.; Knepper, Daniel H.; Langer, William H.

    2000-01-01

    Rapid urbanization of the landscape results in less space available for wildlife habitat, agriculture, and recreation. Mineral resources (especially nonmetallic construction materials) become unrecoverable due to inaccessibility caused by development. This report both describes mine sites with serious problems and draws attention to thoughtful reclamation projects for better future management. It presents information from selected sites in terms of their history, landform, design approach, and visual discernment. Examples from Colorado are included to introduce the broader issue of regions soundly developing mining sites, permitting the best utilization of natural resources, and respecting the landscape.

  4. DOE and AID stand-alone photovoltaic activities

    NASA Technical Reports Server (NTRS)

    Bifano, W. J.; Ratajczak, A. F.

    1983-01-01

    The NASA Lewis Research Center (LeRC) is managing stand-alone photovoltaic (PV) system activities sponsored by the U.S. Department of Energy (DOE) and the U.S. Agency for International Development (AID). The DOE project includes village PV power demonstration projects in Gabon (four sites) and the Marshall Islands, PV-powered medical refrigerators in six countries, PV system microprocessor control development activities and PV-hybrid system assessments. The AID project includes a large village system in Tunisia, a water pumping/grain grinding project in Upper Volta, five medical clinics in four countries, PV-powered remote earth station application. These PV activities and summarizes significant findings to data are reviewed.

  5. Protection of European Cultural Heritage from geo - hazards: the PROTHEGO project.

    NASA Astrophysics Data System (ADS)

    Margottini, Claudio; Spizzichino, Daniele; Cigna, Francesca; Crosta, Giovanni B.; Frattini, Paolo; Themistocleous, Kyriacos; Fernandez Merodo, José Antonio

    2016-04-01

    Tangible cultural heritage includes various categories of monuments and sites, from cultural landscapes and sacred sites to archaeological complexes, individual architectural or artistic monuments and historic urban centers. Such places are continuously impacted and weathered by several internal and external factors, both natural and human-induced, with rapid and/or slow onset, including natural hazards, such as earthquakes or extreme meteorological events, cumulative processes as well as the effects of humans, especially in conflict situations. A clear picture of endangered sites is not available. In particular, the list of List of World Heritage in danger mainly focuses on sites threaten by armed conflicts. New space technology based on radar interferometry (InSAR) is now capable to monitor, since 1992 and with mm precision, surface deformation for reflective targets named persistent scatterers, which consistently return stable signals to the radar satellites. Led by the Italian Institute for Environmental Protection and Research, and in collaboration with NERC British Geological Survey, Geological and Mining Institute of Spain, University of Milano-Bicocca and Cyprus University of Technology, the project PROTHEGO, co-funded in the framework of JPI on Cultural Heritage EU programme (2015-2018), will make an innovative contribution towards the analysis of geo-hazards in areas of cultural heritage in Europe. The project will apply novel InSAR techniques to monitor monuments and sites that are potentially unstable due to landslides, sinkholes, settlement, subsidence, active tectonics as well as structural deformation, all of which could be effected of climate change and human interaction. To magnify the impact of the project, the approach will be implemented in more than 400 sites on the UNESCO World Heritage List in geographical Europe. After the remote sensing investigation, detailed geological interpretation, hazard analysis, local-scale monitoring, advanced modeling and field surveying for the most critical sites will be carried out to discover cause and extent of the observed motions. PROTHEGO will enhance Cultural Heritage management at National level, reinforcing institutional support and governance through knowledge and innovation, identifying, assessing and monitoring risks, strengthening disaster preparedness at heritage properties in the future. PROTHEGO will provide a new remote sensing tool and a new methodological approach, for the safety management of cultural heritage, at low cost and covering monuments and sites located in Europe. The project will promote interdisciplinary and collaborative R&D activities, transferring the highest level of knowledge, quality and standards from space and earth sciences to cultural heritage conservation sciences. The tools developed during the project (e.g. GIS platform, project web sites, European Hazards database assessment, Guidelines, best practices) will be useful to policy makers (public and private) in the field of cultural heritage to inform decision making based on the integrated risk assessment. The outcomes of PROTHEGO will support correct planning and rebalancing the contrast between endogenous (structural and materials decay, the societal development, the anthropogenic pressure) and surrounding exogenous forces (natural hazards acting on the heritage) which affecting the European cultural heritage

  6. Comprehensive, Quantitative Risk Assessment of CO{sub 2} Geologic Sequestration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lepinski, James

    2013-09-30

    A Quantitative Failure Modes and Effects Analysis (QFMEA) was developed to conduct comprehensive, quantitative risk assessments on CO{sub 2} capture, transportation, and sequestration or use in deep saline aquifers, enhanced oil recovery operations, or enhanced coal bed methane operations. The model identifies and characterizes potential risks; identifies the likely failure modes, causes, effects and methods of detection; lists possible risk prevention and risk mitigation steps; estimates potential damage recovery costs, mitigation costs and costs savings resulting from mitigation; and ranks (prioritizes) risks according to the probability of failure, the severity of failure, the difficulty of early failure detection and themore » potential for fatalities. The QFMEA model generates the necessary information needed for effective project risk management. Diverse project information can be integrated into a concise, common format that allows comprehensive, quantitative analysis, by a cross-functional team of experts, to determine: What can possibly go wrong? How much will damage recovery cost? How can it be prevented or mitigated? What is the cost savings or benefit of prevention or mitigation? Which risks should be given highest priority for resolution? The QFMEA model can be tailored to specific projects and is applicable to new projects as well as mature projects. The model can be revised and updated as new information comes available. It accepts input from multiple sources, such as literature searches, site characterization, field data, computer simulations, analogues, process influence diagrams, probability density functions, financial analysis models, cost factors, and heuristic best practices manuals, and converts the information into a standardized format in an Excel spreadsheet. Process influence diagrams, geologic models, financial models, cost factors and an insurance schedule were developed to support the QFMEA model. Comprehensive, quantitative risk assessments were conducted on three (3) sites using the QFMEA model: (1) SACROC Northern Platform CO{sub 2}-EOR Site in the Permian Basin, Scurry County, TX, (2) Pump Canyon CO{sub 2}-ECBM Site in the San Juan Basin, San Juan County, NM, and (3) Farnsworth Unit CO{sub 2}-EOR Site in the Anadarko Basin, Ochiltree County, TX. The sites were sufficiently different from each other to test the robustness of the QFMEA model.« less

  7. Sandia National Laboratories site-wide hydrogeologic characterization project calendar year 1992 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crowson, D.; Gibson, J.D.; Haase, C.S.

    1993-10-01

    The Sandia National Laboratories, New Mexico (SNL/NM) Site-Wide Hydrogeologic Characterization (SWHC) project has been implemented as part of the SNL/NM Environmental Restoration (ER) Program to develop the regional hydrogeologic framework and baseline for the approximately 100 mi of Kirtland Air Force Base (KAFB) and adjacent withdrawn public lands upon which SNL/NM has performed research and development activities. Additionally, the SWHC project will investigate and characterize generic hydrogeologic issues associated with the 172 ER sites owned by SNL/NM across its facilities on KAFB. As called for in the Hazardous and Solid Waste Amendments (HSWA) to the Resource Conservation and Recovery Actmore » (RCRA) Part B permit agreement between the U.S. Environmental Protection Agency (EPA) as the permitter and the U.S. Department of Energy (DOE) and SNL/NM as the permittees, an annual report is to be prepared by the SWHC project team. This document serves two primary purposes: (1) to identify and describe the conceptual framework for the hydrogeologic system underlying SNL/NM and (2) to describe characterization activities undertaken in the preceding year that add to our understanding (reduce our uncertainties) regarding the conceptual and quantitative hydrogeologic framework. This SWHC project annual report focuses primarily on purpose 1, providing a summary description of the current {open_quotes}state of knowledge{close_quotes} of the Sandia National Laboratories/Kirtland Air Force Base (SNL/KAFB) hydrogeologic setting.« less

  8. Systems-Oriented Workplace Learning Experiences for Early Learners: Three Models.

    PubMed

    O'Brien, Bridget C; Bachhuber, Melissa R; Teherani, Arianne; Iker, Theresa M; Batt, Joanne; O'Sullivan, Patricia S

    2017-05-01

    Early workplace learning experiences may be effective for learning systems-based practice. This study explores systems-oriented workplace learning experiences (SOWLEs) for early learners to suggest a framework for their development. The authors used a two-phase qualitative case study design. In Phase 1 (spring 2014), they prepared case write-ups based on transcribed interviews from 10 SOWLE leaders at the authors' institution and, through comparative analysis of cases, identified three SOWLE models. In Phase 2 (summer 2014), studying seven 8-week SOWLE pilots, the authors used interview and observational data collected from the seven participating medical students, two pharmacy students, and site leaders to construct case write-ups of each pilot and to verify and elaborate the models. In Model 1, students performed specific patient care activities that addressed a system gap. Some site leaders helped students connect the activities to larger systems problems and potential improvements. In Model 2, students participated in predetermined systems improvement (SI) projects, gaining experience in the improvement process. Site leaders had experience in SI and often had significant roles in the projects. In Model 3, students worked with key stakeholders to develop a project and conduct a small test of change. They experienced most elements of an improvement cycle. Site leaders often had experience with SI and knew how to guide and support students' learning. Each model could offer systems-oriented learning opportunities provided that key elements are in place including site leaders facile in SI concepts and able to guide students in SOWLE activities.

  9. Multidisciplinary study on anthropogenic landslides in Nepal

    NASA Astrophysics Data System (ADS)

    Puglia, Christopher; Derron, Marc-Henri; Nicolet, Pierrick; Sudmeier-Rieux, Karen; Jaboyedoff, Michel; Devkota, Sanjay

    2013-04-01

    Nepal is a country in which shallow landslide is a frequent phenomenon. Monsoon is the main triggering factor but anthropogenic influence is often significant too. Indeed, many infrastructures, such as roads or water pipes, are not built in a rigorous way because of a lack of funds and knowledge. In the present study we examine the technical, social and economic issues of landslide management for two sites in Nepal. The first site is located in Sanusiruwari VDC (Sindhupalchock district, central Nepal) and the second one in Namadi VDC (Ramecchap district, central Nepal). Both sites are affected by landslides induced by the construction of hydropower plants. These landslides may threaten the viability of the hydropower plants. At both sites the problems are quite similar, but the first site project is a private one and the second one is a public one implemented by the United Nations Development Programme (UNDP). For both sites, bioengineering methods using Vetiver (Vetyveria zizanioides) plantations is the main stabilization measure. To follow the progression of both landslides, fieldwork observations were conducted before and after the 2012 rainy season, including photogrammetric and distancemeter acquisitions. Main issues were discussed with communities and stakeholders of the hydropower projects through interviews and participatory risk mapping. Main issues include: lack of communication between the project managers and communities leading to conflict and the lack of maintenance of the bio-engineering sites, leading to less effective Vetiver growth and slope stabilization. Comparing the landslide management (technical, social and economic) of the two projects allows to point out some specific issues within an integrated risk perspective.

  10. Lessons Learned and Process Improvement for Payload Operations at the Launch Site

    NASA Technical Reports Server (NTRS)

    Catena, John; Gates, Donald, Jr.; Blaney, Kermit, Sr.; Obenschain, Arthur F. (Technical Monitor)

    2001-01-01

    For every space mission, there are challenges with the launch site/field operations process that are addressed too late in the development cycle. This potentially causes schedule delays, cost overruns, and adds risk to the mission success. This paper will discuss how a single interface, representing the payload at the launch site in all phases of development, will mitigate risk, and minimize or even alleviate potential problems later on. Experience has shown that a single interface between the project and the launch site allows for issues to be worked in a timely manner and bridges the gap between two diverse cultures.

  11. Pathology of finfish and mud crabs Scylla serrata during a mortality event associated with a harbour development project in Port Curtis, Australia.

    PubMed

    Dennis, M M; Diggles, B K; Faulder, R; Olyott, L; Pyecroft, S B; Gilbert, G E; Landos, M

    2016-10-27

    The objective of this study was to assess the extent and describe the nature of a multi-species marine finfish and crustacean disease event that occurred in Gladstone Harbour, Australia, 2011-2012. Finfish were examined for this study in January to April 2012 from sites where diseased animals were previously observed by the public. Gross abnormalities, including excessive skin and gill mucus, erythema, heavy ecto-parasitism, cutaneous ulceration, corneal opacity, and exophthalmos, were higher (25.5%) in finfish from Gladstone Harbour (n = 435) than in those from an undeveloped reference site, 250 km to the north (5.5%, n = 146, p < 0.0001). Microscopic abnormalities, especially non-infectious erosive to ulcerative dermatitis and internal parasitism, were more prevalent in fish from Gladstone Harbour (n = 34 of 36, prevalence = 94.4%) than in fish from the reference site (3 of 23, prevalence = 13.0% p < 0.0001). The prevalence of shell lesions was higher in mud crabs Scylla serrata sampled from Gladstone Harbour (270 of 718, prevalence = 37.5%) than from the reference site (21 of 153, prevalence = 13.7%; p < 0.0001). The significantly higher prevalence of ulcerative skin disease and parasitism in a range of species suggests affected animals were subjected to influences in Gladstone Harbour that were not present in the control sites. The disease epidemic coincided temporally and spatially with water quality changes caused by a harbour development project. The unique hydrology, geology, and industrial history of the harbour, the scope of the development of the project, and the failure of a bund wall built to retain dredge spoil sediment were important factors contributing to this epidemic.

  12. Climate Change Resilience Planning at the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.; Johnson, A.

    2015-12-01

    The Savannah River National Laboratory (SRNL) is developing a site sustainability plan for the Department of Energy's Savannah River Site (SRS) in South Carolina in accordance with Executive Order 13693, which charges each DOE agency with "identifying and addressing projected impacts of climate change" and "calculating the potential cost and risk to mission associated with agency operations". The plan will comprise i) projections of climate change, ii) surveys of site managers to estimate the effects of climate change on site operations, and iii) a determination of adaptive actions. Climate change projections for SRS are obtained from multiple sources, including an online repository of downscaled global climate model (GCM) simulations of future climate and downscaled GCM simulations produced at SRNL. Taken together, we have projected data for temperature, precipitation, humidity, and wind - all variables with a strong influence on site operations. SRNL is working to engage site facility managers and facilitate a "bottom up" approach to climate change resilience planning, where the needs and priorities of stakeholders are addressed throughout the process. We make use of the Vulnerability Assessment Scoring Tool, an Excel-based program designed to accept as input various climate scenarios ('exposure'), the susceptibility of assets to climate change ('sensitivity'), and the ability of these assets to cope with climate change ('adaptive capacity'). These are combined to produce a series of scores that highlight vulnerabilities. Working with site managers, we have selected the most important assets, estimated their expected response to climate change, and prepared a report highlighting the most endangered facilities. Primary risks include increased energy consumption, decreased water availability, increased forest fire danger, natural resource degradation, and compromised outdoor worker safety in a warmer and more humid climate. Results of this study will aid in driving future management decisions and promoting sustainable practices at SRS.

  13. Nuclear facility decommissioning and site remedial actions: A selected bibliography, Volume 18. Part 1B: Citations with abstracts, sections 10 through 16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    This bibliography contains 3,638 citations with abstracts of documents relevant to environmental restoration, nuclear facility decontamination and decommissioning (D and D), uranium mill tailings management, and site remedial actions. The bibliography contains scientific, technical, financial, and regulatory information that pertains to DOE environmental restoration programs. The citations are separated by topic into 16 sections, including (1) DOE Environmental Restoration Program; (2) DOE D and D Program; (3) Nuclear Facilities Decommissioning; (4) DOE Formerly Utilized sites Remedial Action Program; (5) NORM-Contaminated Site Restoration; (6) DOE Uranium Mill Tailings Remedial Action Project; (7) Uranium Mill Tailings Management; (8) DOE Site-Wide Remedial Actions;more » (9) DOE Onsite Remedial Action Projects; (10) Contaminated Site Remedial Actions; (11) DOE Underground Storage Tank Remediation; (12) DOE Technology Development, Demonstration, and Evaluation; (13) Soil Remediation; (14) Groundwater Remediation; (15) Environmental Measurements, Analysis, and Decision-Making; and (16) Environmental Management Issues.« less

  14. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysismore » and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)« less

  15. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  16. Serving Impaired Elders in the Community: The Interface of Case Management with Mental Health Services. Texas Project for Elders: Assistance with Long Term Care.

    ERIC Educational Resources Information Center

    Wilson, Nancy L.

    Following a brief introduction, this paper focuses on how the Texas Project for Elders, one of ten sites in the country participatng in the National Long-Term Care Channeling Demonstration Project (Channeling), has taken into account the mental health needs of clients and caregivers both in the development and delivery of services. The clients…

  17. Virtual Archaeodrome for the Archaeological Site from Ulpia Traiana Sarmizegetusa

    NASA Astrophysics Data System (ADS)

    Angheluţǎ, L. M.; Rǎdvan, R.; Chelmuş, A. I.; Ratoiu, L.; Cortea, I. M.; Ghervase, L.

    2017-05-01

    This paper presents an ongoing work within a national project regarding the scientific investigation of one of the most important archaeological sites in Romania: Ulpia Traiana Sarmizegetusa. Although the project has many objectives, in this paper we will focus on the development work of a virtual archaeodrome for the archaeological park. In this regard several field campaigns were organized using the ART4ART mobile laboratory for in-situ non-invasive scientific data acquisition and an online instrument for data reporting and visualizing is currently under development. This work represents a case study of several archaeological assets comprising chronologically layered historical studies, high resolution 3D digital models, ground penetrating radar survey and airborne imaging: LIDAR, multispectral and aerial photogrammetry.

  18. Wind Resource Assessment Report: Mille Lacs Indian Reservation, Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jimenez, Antonio C.; Robichaud, Robi

    The U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage development of renewable energy on potentially contaminated land and mine sites. EPA collaborated with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) and the Mille Lacs Band of Chippewa Indians to evaluate the wind resource and examine the feasibility of a wind project at a contaminated site located on the Mille Lacs Indian Reservation in Minnesota. The wind monitoring effort involved the installation of a 60-m met tower and the collection of 18 months of wind data at multiple heights above the ground.more » This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and an assessment of the economic feasibility of a potential wind project sited this site.« less

  19. Defining a quantitative framework for evaluation and optimisation of the environmental impacts of mega-event projects.

    PubMed

    Parkes, Olga; Lettieri, Paola; Bogle, I David L

    2016-02-01

    This paper presents a novel quantitative methodology for the evaluation and optimisation of the environmental impacts of the whole life cycle of a mega-event project: construction and staging the event and post-event site redevelopment and operation. Within the proposed framework, a mathematical model has been developed that takes into account greenhouse gas (GHG) emissions resulting from use of transportation fuel, energy, water and construction materials used at all stages of the mega-event project. The model is applied to a case study - the London Olympic Park. Three potential post-event site design scenarios of the Park have been developed: Business as Usual (BAU), Commercial World (CW) and High Rise High Density (HRHD). A quantitative summary of results demonstrates that the highest GHG emissions associated with the actual event are almost negligible compared to those associated with the legacy phase. The highest share of emissions in the legacy phase is attributed to embodied emissions from construction materials (almost 50% for the BAU and HRHD scenarios) and emissions resulting from the transportation of residents, visitors and employees to/from the site (almost 60% for the CW scenario). The BAU scenario is the one with the lowest GHG emissions compared to the other scenarios. The results also demonstrate how post-event site design scenarios can be optimised to minimise the GHG emissions. The overall outcomes illustrate how the proposed framework can be used to support decision making process for mega-event projects planning. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  20. Development of Production-Intent Plug-In Hybrid Vehicle Using Advanced Lithium-Ion Battery Packs with Deployment to a Demonstration Fleet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    No, author

    2013-09-29

    The primary goal of this project was to speed the development of one of the first commercially available, OEM-produced plug-in hybrid electric vehicles (PHEV). The performance of the PHEV was expected to double the fuel economy of the conventional hybrid version. This vehicle program incorporated a number of advanced technologies, including advanced lithium-ion battery packs and an E85-capable flex-fuel engine. The project developed, fully integrated, and validated plug-in specific systems and controls by using GM’s Global Vehicle Development Process (GVDP) for production vehicles. Engineering Development related activities included the build of mule vehicles and integration vehicles for Phases I &more » II of the project. Performance data for these vehicles was shared with the U.S. Department of Energy (DOE). The deployment of many of these vehicles was restricted to internal use at GM sites or restricted to assigned GM drivers. Phase III of the project captured the first half or Alpha phase of the Engineering tasks for the development of a new thermal management design for a second generation battery module. The project spanned five years. It included six on-site technical reviews with representatives from the DOE. One unique aspect of the GM/DOE collaborative project was the involvement of the DOE throughout the OEM vehicle development process. The DOE gained an understanding of how an OEM develops vehicle efficiency and FE performance, while balancing many other vehicle performance attributes to provide customers well balanced and fuel efficient vehicles that are exciting to drive. Many vehicle content and performance trade-offs were encountered throughout the vehicle development process to achieve product cost and performance targets for both the OEM and end customer. The project team completed two sets of PHEV development vehicles with fully integrated PHEV systems. Over 50 development vehicles were built and operated for over 180,000 development miles. The team also completed four GM engineering development Buy-Off rides/milestones. The project included numerous engineering vehicle and systems development trips including extreme hot, cold and altitude exposure. The final fuel economy performance demonstrated met the objectives of the PHEV collaborative GM/DOE project. Charge depletion fuel economy of twice that of the non-PHEV model was demonstrated. The project team also designed, developed and tested a high voltage battery module concept that appears to be feasible from a manufacturability, cost and performance standpoint. The project provided important product development and knowledge as well as technological learnings and advancements that include multiple U.S. patent applications.« less

  1. SHynergie: Development of a virtual project laboratory for monitoring hydraulic stimulations

    NASA Astrophysics Data System (ADS)

    Renner, Jörg; Friederich, Wolfgang; Meschke, Günther; Müller, Thomas; Steeb, Holger

    2016-04-01

    Hydraulic stimulations are the primary means of developing subsurface reservoirs regarding the extent of fluid transport in them. The associated creation or conditioning of a system of hydraulic conduits involves a range of hydraulic and mechanical processes but also chemical reactions, such as dissolution and precipitation, may affect the stimulation result on time scales as short as hours. In the light of the extent and complexity of these processes, the steering potential for the operator of a stimulation critically depends on the ability to integrate the maximum amount of site-specific information with profound process understanding and a large spectrum of experience. We report on the development of a virtual project laboratory for monitoring hydraulic stimulations within the project SHynergie (http://www.ruhr-uni-bochum.de/shynergie/). The concept of the laboratory envisioned product that constitutes a preparing and accompanying rather than post-processing instrument ultimately accessible to persons responsible for a project over a web-repository. The virtual laboratory consists of a data base, a toolbox, and a model-building environment. Entries in the data base are of two categories. On the one hand, selected mineral and rock properties are provided from the literature. On the other hand, project-specific entries of any format can be made that are assigned attributes regarding their use in a stimulation problem at hand. The toolbox is interactive and allows the user to perform calculations of effective properties and simulations of different types (e.g., wave propagation in a reservoir, hydraulic test). The model component is also hybrid. The laboratory provides a library of models reflecting a range of scenarios but also allows the user to develop a site-specific model constituting the basis for simulations. The laboratory offers the option to use its components following the typical workflow of a stimulation project. The toolbox incorporates simulation instruments developed in the course of the SHynergie project that account for the experimental and modeling results of the various sub-projects.

  2. "Less Clicking, More Watching": Results from the User-Centered Design of a Multi-Institutional Web Site for Art and Culture.

    ERIC Educational Resources Information Center

    Vergo, John; Karat, Clare-Marie; Karat, John; Pinhanez, Claudio; Arora, Renee; Cofino, Thomas; Riecken, Doug; Podlaseck, Mark

    This paper summarizes a 10-month long research project conducted at the IBM T.J. Watson Research Center aimed at developing the design concept of a multi-institutional art and culture web site. The work followed a user-centered design (UCD) approach, where interaction with prototypes and feedback from potential users of the web site were sought…

  3. Decommissioning of the Iraq former nuclear complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abbas, Mohammed; Helou, Tuama; Ahmead, Bushra

    2007-07-01

    Available in abstract form only. Full text of publication follows: A number of sites in Iraq have some degree of radiological contamination and require decommissioning and remediation in order to ensure radiological safety. Many of these sites in Iraq are located at the nuclear research centre at Al Tuwaitha. The International Atomic Energy Agency (IAEA) Board of Governors has approved a project to assist the Government of Iraq in the evaluation and decommissioning of former facilities that used radioactive materials. The project is divided into three phases: Phase 1: collect and analyze all available data and conduct training of themore » Iraqi staff, Phase 2: develop a decommissioning and remediation plan, and Phase 3: implement field activities relating to decommissioning, remediation and site selection suitable for final disposal of waste. Four working groups have been established to complete the Phase 1 work and significant progress has been made in drafting a new nuclear law which will provide the legal basis for the licensing of the decommissioning of the former nuclear complex. Work is also underway to collect and analysis existing date, to prioritize future activities and to develop a waste management strategy. This will be a long-term and costly project. (authors)« less

  4. Building Real World Domain-Specific Social Network Websites as a Capstone Project

    ERIC Educational Resources Information Center

    Yue, Kwok-Bun; De Silva, Dilhar; Kim, Dan; Aktepe, Mirac; Nagle, Stewart; Boerger, Chris; Jain, Anubha; Verma, Sunny

    2009-01-01

    This paper describes our experience of using Content Management Software (CMS), specifically Joomla, to build a real world domain-specific social network site (SNS) as a capstone project for graduate information systems and computer science students. As Web 2.0 technologies become increasingly important in driving business application development,…

  5. A Wiki-Based Group Project in an Inorganic Chemistry Foundation Course

    ERIC Educational Resources Information Center

    Kristian, Kathleen E.

    2015-01-01

    A semester-long group project that utilizes wiki sites to enhance collaboration was developed for a foundation course in inorganic chemistry. Through structured assignments, student groups use metal-based or metal-combating therapeutic agents as a model for applying and understanding course concepts; they also gain proficiency with scientific- and…

  6. Web Analytics Reveal User Behavior: TTU Libraries' Experience with Google Analytics

    ERIC Educational Resources Information Center

    Barba, Ian; Cassidy, Ryan; De Leon, Esther; Williams, B. Justin

    2013-01-01

    Proper planning and assessment surveys of projects for academic library Web sites will not always be predictive of real world use, no matter how many responses they might receive. In this case, multiple-phase development, librarian focus groups, and patron surveys performed before implementation of such a project inaccurately overrated utility and…

  7. The Klout Challenge: Preparing Your Students for Social Media Marketing

    ERIC Educational Resources Information Center

    Bacile, Todd J.

    2013-01-01

    This paper discusses a newly developed class project to aid students in their social media knowledge and experience. "The Klout Challenge" uses a social media influence metric from Klout.com to assess students' level of engagement with others through social media sites. This project produces multiple benefits for students. Students…

  8. Accessibility benchmarks: interpretive programs and services in north central California

    Treesearch

    Laura J. McLachlin; Emilyn A. Sheffield; Donald A. Penland; Charles W. Nelson

    1995-01-01

    The Heritage Corridors Project was a unique partnership between the California Department of Parks and Recreation, the California State University, and the Across California Conservancy. The purpose of the project was to develop a map of selected northern California outdoor recreation and heritage sites. Data about facility accessibility improvements (restrooms, clear...

  9. Sensitive Technology Assessment of ACOT.

    ERIC Educational Resources Information Center

    Baker, Eva L.

    This paper explores the ideas and the model underlying the evaluation of the Apple Classroom of Tomorrow project (ACOT), a 2-year-old research and development project incorporating at least seven different grade levels which is located in five different school sites in four states. The major features of ACOT are identified as the ideas of computer…

  10. A generalized system of models forecasting Central States tree growth.

    Treesearch

    Stephen R. Shifley

    1987-01-01

    Describes the development and testing of a system of individual tree-based growth projection models applicable to species in Indiana, Missouri, and Ohio. Annual tree basal area growth is estimated as a function of tree size, crown ratio, stand density, and site index. Models are compatible with the STEMS and TWIGS Projection System.

  11. The collection of national trend data on alcohol related crashes for comparison with alcohol safety action projects results. Volume 2, ASAP control site data

    DOT National Transportation Integrated Search

    1977-07-01

    As a result of evaluations of the Alcohol Safety Action Projects (ASAP), a requirement was generated by the National Highway Traffic Safety Administration (NHTSA) for the development of a data base of alcohol-related accidents in communities with no ...

  12. Assessment Administration Guide. Indigenous Mathematics Project. Working Paper 3.

    ERIC Educational Resources Information Center

    Souviney, Randall J.

    The assessement materials described in this report were used by the Indigenous Mathematics Project to document various achievement and cognitive development factors at five sites in Papua New Guinea. The achievement instruments are criteria-referenced and consist of the Primary Maths Achievement Test, The Test of Arithmetic Skills, and the reading…

  13. Developing Web Services for Technology Education. The Graphic Communication Electronic Publishing Project.

    ERIC Educational Resources Information Center

    Sanders, Mark

    1999-01-01

    Graphic Communication Electronic Publishing Project supports a Web site (http://TechEd.vt.edu/gcc/) for graphic communication teachers and students, providing links to Web materials, conversion of print materials to electronic formats, and electronic products and services including job listings, resume posting service, and a listserv. (SK)

  14. Impacts of wave energy conversion devices on local wave climate: observations and modelling from the Perth Wave Energy Project

    NASA Astrophysics Data System (ADS)

    Hoeke, Ron; Hemer, Mark; Contardo, Stephanie; Symonds, Graham; Mcinnes, Kathy

    2016-04-01

    As demonstrated by the Australian Wave Energy Atlas (AWavEA), the southern and western margins of the country possess considerable wave energy resources. The Australia Government has made notable investments in pre-commercial wave energy developments in these areas, however little is known about how this technology may impact local wave climate and subsequently affect neighbouring coastal environments, e.g. altering sediment transport, causing shoreline erosion or accretion. In this study, a network of in-situ wave measurement devices have been deployed surrounding the 3 wave energy converters of the Carnegie Wave Energy Limited's Perth Wave Energy Project. This data is being used to develop, calibrate and validate numerical simulations of the project site. Early stage results will be presented and potential simulation strategies for scaling-up the findings to larger arrays of wave energy converters will be discussed. The intended project outcomes are to establish zones of impact defined in terms of changes in local wave energy spectra and to initiate best practice guidelines for the establishment of wave energy conversion sites.

  15. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupferman, S.L.

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group hasmore » also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base.« less

  16. Development of a health information technology-based data system in community-based hospice and palliative care.

    PubMed

    Abernethy, Amy P; Wheeler, Jane L; Bull, Janet

    2011-05-01

    Few hospice and palliative care organizations use health information technology (HIT) for data collection and management; the feasibility and utility of a HIT-based approach in this multi-faceted, interdisciplinary context is unclear. To develop a HIT-based data infrastructure that serves multiple hospice and palliative care sites, meeting clinical and administrative needs with data, technical, and analytic support. Through a multi-site academic/community partnership, a data infrastructure was collaboratively developed, pilot-tested at a community-based site, refined, and demonstrated for data collection and preliminary analysis. Additional sites, which participated in system development, became prepared to contribute data to the growing aggregate database. Electronic data collection proved feasible in community-based hospice and palliative care. The project highlighted "success factors" for implementing HIT in this field: engagement of site-based project "champions" to promote the system from within; involvement of stakeholders at all levels of the organization, to promote culture change and buy-in; attention to local needs (e.g., data for quality reporting) and requirements (e.g., affordable cost, efficiency); consideration of practical factors (e.g., potential to interfere with clinical flow); provision of adequate software, technical, analytic, and statistical support; availability of flexible HIT options (e.g., different data-collection platforms); and adoption of a consortium approach in which sites can support one another, learn from each others' experiences, pool data, and benefit from economies of scale. In hospice and palliative care, HIT-based data collection/management has potential to generate better understanding of populations and outcomes, support quality assessment/quality improvement, and prepare sites to participate in research. Copyright © 2011 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  17. 78 FR 19445 - Notice of Proposed New Fee Sites; Federal Lands Recreation Enhancement Act, (Title VIII, Pub. L...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... services provided, cost of operation and maintenance, market assessment, and public comment. Funds from fees would be used for the continued operation and maintenance of these recreation sites. Lake Canyon... development of numerous unauthorized roads and camping. The restoration project has closed unauthorized trails...

  18. 78 FR 31941 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-28

    ... burden 810 RISE Staff Pre-Test 157 1 .25 39 RISE Staff Post-Test 157 1 .25 39 RISE burden 78 Estimated... addition, evaluation plans were developed to support rigorous site-specific and cross-site studies to... and Lesbian Center's Recognize Intervene Support Empower (RISE) project. A third phase of the study...

  19. DAG: a new observatory and a prospective observing site for other potential telescopes

    NASA Astrophysics Data System (ADS)

    Yeşilyaprak, Cahit; Yerli, Sinan K.; Keskin, Onur; Güçsav, B. Bülent

    2016-07-01

    DAG (Eastern Anatolia Observatory is read as "Doğu Anadolu Gözlemevi" in Turkish) is the newest and largest observatory of Turkey, constructed at an altitude of 3150 m in Konaklı/Erzurum provenience, with an optical and nearinfrared telescope (4 m in diameter) and its robust observing site infrastructure. This national project consists of three main phases: DAG (Telescope, Enclosure, Buildings and Infrastructures), FPI (Focal Plane Instruments and Adaptive Optics) and MCP (Mirror Coating Plant). All these three phases are supported by the Ministry of Development of Turkey and funding is awarded to Atatürk University. Telescope, enclosure and building tenders were completed in 2014, 2015 and 2016, respectively. The final design of telescope, enclosure and building and almost all main infrastructure components of DAG site have been completed; mainly: road work, geological and atmospheric surveys, electric and fiber cabling, water line, generator system, cable car to summit. This poster explains recent developments of DAG project and talks about the future possible collaborations for various telescopes which can be constructed at the site.

  20. Environmental Assessment: Addressing Construction Projects at Niagara Falls Air Reserve Station, New York

    DTIC Science & Technology

    2011-07-01

    Aeronautical Research Center missile site (Site 5), JP-4 tank truck spill (Site 7) at the eastern end of Taxiway A, Building 202 Drum Storage Yard (Site...BNOISE2. BNOISE2 was developed by the . U.S. Army Construction Engineering Research Laboratory for the Operational Noise to assess large arms weapons...was estimated using the OneShot component of BNOISE2. Per AR 200-1, if there are multiple weapon types fired from one location, the single-event

  1. The Portland Harbor Superfund Site Sustainability Project: Introduction.

    PubMed

    Fitzpatrick, Anne G; Apitz, Sabine E; Harrison, David; Ruffle, Betsy; Edwards, Deborah A

    2018-01-01

    This article introduces the Portland Harbor Superfund Site Sustainability Project (PHSP) special series in this issue. The Portland Harbor Superfund Site is one of the "mega-sediment sites" in the United States, comprising about 10 miles of the Lower Willamette River, running through the heart of Portland, Oregon. The primary aim of the PHSP was to conduct a comprehensive sustainability assessment, integrating environmental, economic, and social considerations of a selection of the remedial alternatives laid out by the US Environmental Protection Agency. A range of tools were developed for this project to quantitatively address environmental, economic, and social costs and benefits based upon diverse stakeholder values. In parallel, a probabilistic risk assessment was carried out to evaluate the risk assumptions at the core of the remedial investigation and feasibility study process. Integr Environ Assess Manag 2018;14:17-21. © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC). © 2017 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  2. Terrestrial laser scanning for heritage conservation: the Cologne Cathedral documentation project

    NASA Astrophysics Data System (ADS)

    Pritchard, D.; Sperner, J.; Hoepner, S.; Tenschert, R.

    2017-08-01

    Contemporary terrestrial laser scanners and photogrammetric imaging systems are an invaluable tool in providing objectively precise, as-built records of existing architectural, engineering and industrial sites. The comprehensive three-dimensional (3D) recording of culturally important sites such as heritage buildings, monuments, and sites can serve a variety of invaluable purposes; the data can assist in the conservation, management, and repair of a structure, as well as provide a visually engaging educational resource for both the public and scholars. The acquired data acts as a form of digital preservation, a timeless virtual representation of the as-built structure. The technical capability of these systems is particularly suited for the documentation of a richly articulated and detailed building such as the high Gothic Cologne Cathedral. The 3D documentation of the Cologne Cathedral UNESCO World Heritage Site is a multiphase project developed by Heriot-Watt University, Edinburgh in partnership with the Fresenius University of Applied Sciences, Cologne, and the Metropolitankapitel der Hohen Domkirche Köln Dombauhütte. The project has also received generous support from Zoller + Fröhlich (Z+F) and the City of Cologne.

  3. Science Base and Tools for Evaluating Stream Restoration Project Proposals.

    NASA Astrophysics Data System (ADS)

    Cluer, B.; Thorne, C.; Skidmore, P.; Castro, J.; Pess, G.; Beechie, T.; Shea, C.

    2008-12-01

    Stream restoration, stabilization, or enhancement projects typically employ site-specific designs and site- scale habitat improvement projects have become the default solution to many habitat problems and constraints. Such projects are often planned and implemented without thorough consideration of the broader scale problems that may be contributing to habitat degradation, attention to project resiliency to flood events, accounting for possible changes in climate or watershed land use, or ensuring the long term sustainability of the project. To address these issues, NOAA Fisheries and USFWS have collaboratively commissioned research to develop a science document and accompanying tools to support more consistent and comprehensive review of stream management and restoration projects proposals by Service staff responsible for permitting. The science document synthesizes the body of knowledge in fluvial geomorphology and presents it in a way that is accessible to the Services staff biologists, who are not trained experts in this field. Accompanying the science document are two electronic tools: a Project Information Checklist to assist in evaluating whether a proposal includes all the information necessary to allow critical and thorough project evaluation; and a Project Evaluation Tool (in flow chart format) that guides reviewers through the steps necessary to critically evaluate the quality of the information submitted, the goals and objectives of the project, project planning and development, project design, geomorphic-habitat-species relevance, and risks to listed species. Materials for training Services staff and others in the efficient use of the science document and tools have also been developed. The longer term goals of this effort include: enabling consistent and comprehensive reviews that are completed in a timely fashion by regulators; facilitating improved project planning and design by proponents; encouraging projects that are attuned to their watershed and geomorphic contexts; questioning perceived constraints on project design; reducing the use of hard structures and encouraging deformability; promoting designs that address both risk and uncertainty in applying engineering design standards; allowing for future climate and land use changes; and encouraging post-project monitoring, appraisal and project aftercare.

  4. Postnatal Maturation of the Red Nucleus Motor Map Depends on Rubrospinal Connections with Forelimb Motor Pools

    PubMed Central

    Williams, Preston T. J. A.; Kim, Sangsoo

    2014-01-01

    The red nucleus (RN) and rubrospinal tract (RST) are important for forelimb motor control. Although the RST is present postnatally in cats, nothing is known about when rubrospinal projections could support motor functions or the relation between the development of the motor functions of the rubrospinal system and the corticospinal system, the other major system for limb control. Our hypothesis is that the RN motor map is present earlier in development than the motor cortex (M1) map, to support early forelimb control. We investigated RN motor map maturation with microstimulation and RST cervical enlargement projections using anterograde tracers between postnatal week 3 (PW3) and PW16. Microstimulation and tracer injection sites were verified histologically to be located within the RN. Microstimulation at PW4 evoked contralateral wrist, elbow, and shoulder movements. The number of sites producing limb movement increased and response thresholds decreased progressively through PW16. From the outset, all forelimb joints were represented. At PW3, RST projections were present within the cervical intermediate zone, with a mature density of putative synapses. In contrast, beginning at PW5 there was delayed and age-dependent development of forelimb motor pool projections and putative rubromotoneuronal synapses. The RN has a more complete forelimb map early in development than previous studies showed for M1, supporting our hypothesis of preferential rubrospinal rather than corticospinal control for early movements. Remarkably, development of the motor pool, not intermediate zone, RST projections paralleled RN motor map development. The RST may be critical for establishing the rudiments of motor skills that subsequently become refined with further CST development. PMID:24647962

  5. Brownfields Samoa Peninsula Project: Phase I Sustainable Site Analysis Final Report

    EPA Pesticide Factsheets

    This report provides an analysis and scoring using the Leadership in Energy and Environmental Design, Neighborhood Development Rating System, and the Land and Natural Development Code in order to assess the proposed redevelopment a master plan.

  6. Hydrologic index development and application to selected Coastwide Reference Monitoring System sites and Coastal Wetlands Planning, Protection and Restoration Act projects

    USGS Publications Warehouse

    Snedden, Gregg A.; Swenson, Erick M.

    2012-01-01

    Hourly time-series salinity and water-level data are collected at all stations within the Coastwide Reference Monitoring System (CRMS) network across coastal Louisiana. These data, in addition to vegetation and soils data collected as part of CRMS, are used to develop a suite of metrics and indices to assess wetland condition in coastal Louisiana. This document addresses the primary objectives of the CRMS hydrologic analytical team, which were to (1) adopt standard time-series analytical techniques that could effectively assess spatial and temporal variability in hydrologic characteristics across the Louisiana coastal zone on site, project, basin, and coastwide scales and (2) develop and apply an index based on wetland hydrology that can describe the suitability of local hydrology in the context of maximizing the productivity of wetland plant communities. Approaches to quantifying tidal variability (least squares harmonic analysis) and partitioning variability of time-series data to various time scales (spectral analysis) are presented. The relation between marsh elevation and the tidal frame of a given hydrograph is described. A hydrologic index that integrates water-level and salinity data, which are collected hourly, with vegetation data that are collected annually is developed. To demonstrate its utility, the hydrologic index is applied to 173 CRMS sites across the coast, and variability in index scores across marsh vegetation types (fresh, intermediate, brackish, and saline) is assessed. The index is also applied to 11 sites located in three Coastal Wetlands Planning, Protection and Restoration Act projects, and the ability of the index to convey temporal hydrologic variability in response to climatic stressors and restoration measures, as well as the effect that this community may have on wetland plant productivity, is illustrated.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peck, T; Sparkman, D; Storch, N

    ''The LLNL Site-Specific Advanced Simulation and Computing (ASCI) Software Quality Engineering Recommended Practices VI.I'' document describes a set of recommended software quality engineering (SQE) practices for ASCI code projects at Lawrence Livermore National Laboratory (LLNL). In this context, SQE is defined as the process of building quality into software products by applying the appropriate guiding principles and management practices. Continual code improvement and ongoing process improvement are expected benefits. Certain practices are recommended, although projects may select the specific activities they wish to improve, and the appropriate time lines for such actions. Additionally, projects can rely on the guidance ofmore » this document when generating ASCI Verification and Validation (VSrV) deliverables. ASCI program managers will gather information about their software engineering practices and improvement. This information can be shared to leverage the best SQE practices among development organizations. It will further be used to ensure the currency and vitality of the recommended practices. This Overview is intended to provide basic information to the LLNL ASCI software management and development staff from the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I'' document. Additionally the Overview provides steps to using the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I'' document. For definitions of terminology and acronyms, refer to the Glossary and Acronyms sections in the ''LLNL Site-Specific ASCI Software Quality Engineering Recommended Practices VI.I''.« less

  8. Engaging Alaskan Students in Cryospheric Research

    NASA Astrophysics Data System (ADS)

    Yoshikawa, K.; Sparrow, E. B.; Kopplin, M.

    2011-12-01

    The Permafrost/Active Layer Monitoring Program is an ongoing project, which builds on work begun in 2005 to establish long-term permafrost and active layer monitoring sites adjacent to schools in Alaskan communities and in the circumpolar permafrost region. Currently, there are about 200 schools in Alaska involved in the project including also Denali National Park and Preserve. The project has both scientific and outreach components. The monitoring sites collect temperature data on permafrost, and the length and depth of the active layer (the layer above the permafrost that thaws during summer and freezes again during winter). To ensure scientific integrity, the scientist installed all of the monitoring instruments and selected the sites representative of the surrounding biome and thermal conditions. This is a unique collaboration opportunity in that 1) uses scientifically accurate instruments, 2) is scientist led and supervised including instrumentation set-up and data quality check, 3)has teacher/student organized observation network, 4) increased spatial scale of monitoring sites that covers all of the Alaskan communities. Most of the monitoring sites are located in remote communities, where the majority of residents depend on a subsistence lifestyle. Changes in climate, length of seasons, and permafrost conditions directly impact natural resources and subsistence activities. Changes in permafrost conditions also affect local ecosystems and hydrological regimes, and can influence the severity of natural disasters. In addition to extending our knowledge of the arctic environment, the program involves school-age students. Several students have been using the data for their projects and have been inspired to continue their studies. The data gathered from these stations are shared with other schools and made available to the public through our web site (http://www.uaf.edu/permafrost). Also communities have increasingly become interested in this project not only as an educational program, but also for its implications for disasters such as mud slides, loss of food storage in the ground capability, water pipes bursting from ground freezing at lower depths. Challenges in education outreach include the high cost (dollars and time) of reaching the remote study sites scattered all over the vast Alaskan landscape and how to increase understanding of the science concepts in the long-term study of permafrost and active layer, by students. In addition to the scientific measurement protocols and learning activities developed, videos of the adventures of a superhero Tunnel Man, were developed, produced and are made available on the project website as well as on YouTube. Through this project, students in remote Alaskan communities learn science in a way that is meaningful to their daily lives. In addition, they experience research participation within a larger scientific community, expanding their worldview.

  9. Bigfoot Field Manual

    NASA Astrophysics Data System (ADS)

    Campbell, J. L.; Burrows, S.; Gower, S. T.; Cohen, W. B.

    1999-09-01

    The BigFoot Project is funded by the Earth Science Enterprise to collect and organize data to be used in the EOS Validation Program. The data collected by the BigFoot Project are unique in being ground-based observations coincident with satellite overpasses. In addition to collecting data, the BigFoot project will develop and test new algorithms for scaling point measurements to the same spatial scales as the EOS satellite products. This BigFoot Field Manual Mill be used to achieve completeness and consistency of data collected at four initial BigFoot sites and at future sites that may collect similar validation data. Therefore, validation datasets submitted to the ORNL DAAC that have been compiled in a manner consistent with the field manual will be especially valuable in the validation program.

  10. Water-quality data for selected North Carolina streams and reservoirs in the Triangle Area Water Supply Monitoring Project, 1988-92

    USGS Publications Warehouse

    Garrett, Ronald G.; Taylor, John E.; Middleton, Terry L.

    1994-01-01

    The Triangle Area Water Supply Monitoring Project was developed to assess regional water-quality characteristics in drinking-water supplies and to provide a basis for determining trends in water quality for the Research Triangle area, which is one of the fastest growing areas in North Carolina. The study area is in the upper Neuse River Basin and the upper Cape Fear River Basin in the north-central Piedmont Province of the State. Hydrologic data were collected at 21 reservoir sites and 30 stream sites from October 1988 through September 1992 to define water-quality characteristics. The data collected at these sites include streamflow data and approximately 275 physical properties and chemical characteristics of surface water.

  11. Morpheus Lander Testing Campaign

    NASA Technical Reports Server (NTRS)

    Hart, Jeremy J.; Mitchell, Jennifer D.

    2011-01-01

    NASA s Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing designed to serve as a testbed for advanced spacecraft technologies. The Morpheus vehicle has successfully performed a set of integrated vehicle test flights including hot-fire and tether tests, ultimately culminating in an un-tethered "free-flight" This development and testing campaign was conducted on-site at the Johnson Space Center (JSC), less than one year after project start. Designed, developed, manufactured and operated in-house by engineers at JSC, the Morpheus Project represents an unprecedented departure from recent NASA programs and projects that traditionally require longer development lifecycles and testing at remote, dedicated testing facilities. This paper documents the integrated testing campaign, including descriptions of test types (hot-fire, tether, and free-flight), test objectives, and the infrastructure of JSC testing facilities. A major focus of the paper will be the fast pace of the project, rapid prototyping, frequent testing, and lessons learned from this departure from the traditional engineering development process at NASA s Johnson Space Center.

  12. Monitoring of Space and Earth electromagnetic environment by MAGDAS project: Collaboration with IKIR - Introduction to ICSWSE/MAGDAS project

    NASA Astrophysics Data System (ADS)

    Yoshikawa, Akimasa; Fujimoto, Akiko; Ikeda, Akihiro; Uozumi, Teiji; Abe, Shuji

    2017-10-01

    For study of coupling processes in the Solar-Terrestrial System, International Center for Space Weather Science and Education (ICSWSE), Kyushu University has developed a real time magnetic data acquisition system (the MAGDAS project) around the world. The number of observational sites is increasing every year with the collaboration of host countries. Now at this time, the MAGDAS Project has installed 78 real time magnetometers - so it is the largest magnetometer array in the world. The history of global observation at Kyushu University is over 30 years and number of developed observational sites is over 140. Especially, Collaboration between IKIR is extended back to 1990's. Now a time, we are operating Flux-gate magnetometer and FM-CW Radar. It is one of most important collaboration for space weather monitoring. By using MAGDAS data, ICSWSE produces many types of space weather index, such as EE-index (for monitoring long tern and shot term variation of equatorial electrojet), Pc5 index (for monitoring solar-wind velocity and high energy electron flux), Sq-index (for monitoring global change of ionospheric low and middle latitudinal current system), and Pc3 index (for monitoring of plasma density variation at low latitudes). In this report, we will introduce recent development of MAGDAS/ICSWSE Indexes project and topics for new open policy for MAGDAS data will be also discussed.

  13. An Overview of Public Domain Tools for Measuring the Sustainability of Environmental Remediation - 12060

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Claypool, John E.; Rogers, Scott

    The application of sustainability principles to the investigation and remediation of contaminated sites is an area of rapid development within the environmental profession, with new business practices, tools, and performance standards for identifying, evaluating, and managing the 'collateral' impacts of cleanup projects to the environment, economy and society coming from many organizations. Guidelines, frameworks, and standards of practice for 'green and sustainable remediation' (GSR) have been released and are under development by the Sustainable Remediation Forum (SURF), the American Society for Testing Materials (ASTM), the Interstate Technology Roundtable Commission (ITRC) and other organizations in the U.S. and internationally. In responsemore » to Executive Orders from the President, Federal government agencies have developed policies, procedures and guidelines for evaluating and reporting the sustainability of their environmental restoration projects. Private sector companies in the petroleum, utility, manufacturing, defense, and other sectors are developing their own corporate GSR programs to improve day-to-day management of contaminated sites and to support external reporting as part of their corporate social responsibility (CSR) efforts. The explosion of mandates, policy, procedures and guidance raises the question of how to determine whether a remediation technology or cleanup approach is green and/or sustainable. The environmental profession has responded to this question by designing, developing and deploying a wide array of tools, calculators, and databases that enable regulatory agencies, site managers and environmental professionals to calculate the collateral impacts of their remediation projects in the environmental, social, and economic domains. Many of these tools are proprietary ones developed by environmental engineering/consulting firms for use in their consulting engagements and/or tailored specifically to meet the needs of their clients. When it comes to the public domain, Federal government agencies are spearheading the development of software tools to measure and report emissions of air pollutants (e.g., carbon dioxide, other greenhouse gases, criteria air pollutants); consumption of energy, water and natural resources; accident and safety risks; project costs and other economic metrics. Most of the tools developed for the Government are available to environmental practitioners without charge, so they are growing in usage and popularity. The key features and metrics calculated by the available public-domain tools for measuring the sustainability of environmental remediation projects share some commonalities but there are differences amongst the tools. The SiteWise{sup TM} sustainability tool developed for the Navy and US Army will be compared with the Sustainable Remediation Tool (SRT{sup TM}) developed for the US Air Force (USAF). In addition, the USAF's Clean Solar and Wind Energy in Environmental Programs (CleanSWEEP), a soon-to-be-released tool for evaluating the economic feasibility of utilizing renewal energy for powering remediation systems will be described in the paper. (authors)« less

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sotiropoulos, Fotis; Marr, Jeffrey D.G.; Milliren, Christopher

    In January 2010, the University of Minnesota, along with academic and industry project partners, began work on a four year project to establish new facilities and research in strategic areas of wind energy necessary to move the nation towards a goal of 20% wind energy by 2030. The project was funded by the U.S. Department of Energy with funds made available through the American Recovery and Reinvestment Act of 2009. $7.9M of funds were provided by DOE and $3.1M was provided through matching funds. The project was organized into three Project Areas. Project Area 1 focused on design and developmentmore » of a utility scale wind energy research facility to support research and innovation. The project commissioned the Eolos Wind Research Field Station in November of 2011. The site, located 20 miles from St. Paul, MN operates a 2.5MW Clipper Liberty C-96 wind turbine, a 130-ft tall sensored meteorological tower and a robust sensor and data acquisition network. The site is operational and will continue to serve as a site for innovation in wind energy for the next 15 years. Project Areas 2 involved research on six distinct research projects critical to the 20% Wind Energy by 2030 goals. The research collaborations involved faculty from two universities, over nine industry partners and two national laboratories. Research outcomes include new knowledge, patents, journal articles, technology advancements, new computational models and establishment of new collaborative relationships between university and industry. Project Area 3 focused on developing educational opportunities in wind energy for engineering and science students. The primary outcome is establishment of a new graduate level course at the University of Minnesota called Wind Engineering Essentials. The seminar style course provides a comprehensive analysis of wind energy technology, economics, and operation. The course is highly successful and will continue to be offered at the University. The vision of U.S. DOE to establish unique, open-access research facilities and creation of university-industry research collaborations in wind energy were achieved through this project. The University of Minnesota, through the establishment of the Eolos Wind Energy Consortium and the Eolos Wind Research Field Station continue to develop new research collaborations with industry partners.« less

  15. Instruments and Methodologies for the Underwater Tridimensional Digitization and Data Musealization

    NASA Astrophysics Data System (ADS)

    Repola, L.; Memmolo, R.; Signoretti, D.

    2015-04-01

    In the research started within the SINAPSIS project of the Università degli Studi Suor Orsola Benincasa an underwater stereoscopic scanning aimed at surveying of submerged archaeological sites, integrable to standard systems for geomorphological detection of the coast, has been developed. The project involves the construction of hardware consisting of an aluminum frame supporting a pair of GoPro Hero Black Edition cameras and software for the production of point clouds and the initial processing of data. The software has features for stereoscopic vision system calibration, reduction of noise and the of distortion of underwater captured images, searching for corresponding points of stereoscopic images using stereo-matching algorithms (dense and sparse), for points cloud generating and filtering. Only after various calibration and survey tests carried out during the excavations envisaged in the project, the mastery of methods for an efficient acquisition of data has been achieved. The current development of the system has allowed generation of portions of digital models of real submerged scenes. A semi-automatic procedure for global registration of partial models is under development as a useful aid for the study and musealization of sites.

  16. SUSTAINABLE COMMUNITY DEVELOPMENT &NDASH; WATER SLOW-SAND FILTRATION

    EPA Science Inventory

    Site Survey: When this project was developed, the village of Santa Cruz, Baja Verapaz, Guatemala was chosen as a target community for initial development and target implementation. The research team of six students and advisor traveled to the village in early August 2...

  17. Characterization and design of the FutureGen 2.0 carbon storage site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilmore, Tyler; Bonneville, Alain; Sullivan, Charlotte

    2016-10-01

    The objective of the FutureGen 2.0 Project was to demonstrate, at the commercial scale, the technical feasibility of implementing carbon capture and storage (CCS) in a deep saline formation in Illinois, USA. Over approximately 5 years, the FutureGen Alliance conducted a detailed site-selection process and identified a site for carbon sequestration storage in Morgan County, Illinois. The storage site was fully characterized, including the collection of seismic data and the drilling and characterization of a stratigraphic borehole. The characterization data provided critical input for developing a site-specific conceptual model and subsequent numerical modeling simulations. The modeling simulations, coupled with themore » upstream designs of the pipeline and power plant supported the development of a detailed 90 percent design that included the injection wells and associated control and monitoring infrastructure. Collectively, all these data were used by the FutureGen Alliance to develop the required documentation to support the applications for four underground injection control (UIC) permits (one for each proposed well). In August 2014, the U.S. Environmental Protection Agency issued four, first-of-their-kind, Class VI UIC permits for carbon sequestration in the United States to the FutureGen Alliance. The information and data generated under this project have been made publically available through reports and publications, including this journal and others.« less

  18. Brownfield to Brightfield Initiative in Oak Ridge, TN - 12346

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hough, Gil; Fairless, Chad

    Experience characterizing, permitting, and restoring 'Brownfield' sites-government or industrial sites with restricted future use due to the presence or potential presence of hazardous substances, pollutants, or contaminants-is being leveraged to identify opportunities for redevelopment into solar power generating facilities which, in this context, are called 'Brightfields'. Brownfield sites offer the expansive land necessary for large photovoltaic (PV) solar farms, but require an in-depth working knowledge of complicated regulatory restrictions and environmental constraints to develop them. As a part of the effort to identify opportunities for redevelopment of Brownfield sites for solar applications, a technical guide, was composed specifically for themore » development of solar generation on restricted use sites. The basis of the technical guide gives specific consideration to environmental requirements and installation methods breaking that into three areas for assessing: 1) levels of contamination, 2) ground penetration requirements, and 3) the requirements for aesthetics and maintenance. Brightfield projects are underway to support the technical guide and expand re-industrialization efforts for the former DOE Gaseous Diffusion Plant in Oak Ridge, TN. There are exciting opportunities to turn Brownfields into Brightfield solar energy solutions for meeting the future renewable energy needs of our country. Brownfields that offer the large surface area required for solar PV farms coupled with the technical guide for the installation of solar farms on restricted use sites supports efforts to develop the solar capacities and expertise to tap this future market. The initial projects designed following the technical guide will provide verification of the installation requirements and beneficial reuse of restricted use sites. (authors)« less

  19. A New Framework for Adaptive Sampling and Analysis During Long-Term Monitoring and Remedial Action Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minsker, Barbara

    2004-12-01

    The Argonne team has gathered available data on monitoring wells and measured hydraulic heads from the Argonne 317/319 site and sent it to UIUC. Xiaodong Li, a research assistant supported by the project, has reviewed the data and has fit initial spatiotemporal statistical models to it. Another research assistant, Yonas Demissie, has completed generation of the artificial data that will be used for model development and testing. In order to generate the artificial data a detailed groundwater flow and contaminant transport model was developed based upon characteristics of the 317/319 site. The model covers a multi-year time horizon that includesmore » both before and after planting of the trees. As described in the proposal, the artificial data is created by adding ''measurement'' error to the ''true'' value from the numerical model. To date, only simple white noise error models have been considered. He is now reviewing the literature and beginning to develop a hierarchical modeling approach for the artificial data. Abhishek Singh, a third research assistant supported by the project, is implementing learning models for learning users preferences in an interactive genetic algorithm for solving the inverse problem. Meghna Babbar, the fourth research assistant supported by the project, has been improving the user interface for the interactive genetic algorithm and preparing a long-term monitoring design problem for testing the approach. Gayathri Gopalakrishnan, the last research assistant who is partially supported by the project, has collected substantial data from the 317/319 phytoremediation site at Argonne and has begun learning approaches for modeling these data.« less

  20. Novel Sensor for the In Situ Measurement of Uranium Fluxes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatfield, Kirk

    2015-02-10

    The goal of this project was to develop a sensor that incorporates the field-tested concepts of the passive flux meter to provide direct in situ measures of flux for uranium and groundwater in porous media. Measurable contaminant fluxes [J] are essentially the product of concentration [C] and groundwater flux or specific discharge [q ]. The sensor measures [J] and [q] by changes in contaminant and tracer amounts respectively on a sorbent. By using measurement rather than inference from static parameters, the sensor can directly advance conceptual and computational models for field scale simulations. The sensor was deployed in conjunction withmore » DOE in obtaining field-scale quantification of subsurface processes affecting uranium transport (e.g., advection) and transformation (e.g., uranium attenuation) at the Rifle IFRC Site in Rifle, Colorado. Project results have expanded our current understanding of how field-scale spatial variations in fluxes of uranium, groundwater and salient electron donor/acceptors are coupled to spatial variations in measured microbial biomass/community composition, effective field-scale uranium mass balances, attenuation, and stability. The coupling between uranium, various nutrients and micro flora can be used to estimate field-scale rates of uranium attenuation and field-scale transitions in microbial communities. This research focuses on uranium (VI), but the sensor principles and design are applicable to field-scale fate and transport of other radionuclides. Laboratory studies focused on sorbent selection and calibration, along with sensor development and validation under controlled conditions. Field studies were conducted at the Rifle IFRC Site in Rifle, Colorado. These studies were closely coordinated with existing SBR (formerly ERSP) projects to complement data collection. Small field tests were conducted during the first two years that focused on evaluating field-scale deployment procedures and validating sensor performance under controlled field conditions. In the third and fourth year a suite of larger field studies were conducted. For these studies, the uranium flux sensor was used with uranium speciation measurements and molecular-biological tools to characterize microbial community and active biomass at synonymous wells distributed in a large grid. These field efforts quantified spatial changes in uranium flux and field-scale rates of uranium attenuation (ambient and stimulated), uranium stability, and quantitatively assessed how fluxes and effective reaction rates were coupled to spatial variations in microbial community and active biomass. Analyses of data from these field experiments were used to generate estimates of Monod kinetic parameters that are ‘effective’ in nature and optimal for modeling uranium fate and transport at the field-scale. This project provided the opportunity to develop the first sensor that provides direct measures of both uranium (VI) and groundwater flux. A multidisciplinary team was assembled to include two geochemists, a microbiologist, and two quantitative contaminant hydrologists. Now that the project is complete, the sensor can be deployed at DOE sites to evaluate field-scale uranium attenuation, source behavior, the efficacy of remediation, and off-site risk. Because the sensor requires no power, it can be deployed at remote sites for periods of days to months. The fundamental science derived from this project can be used to advance the development of predictive models for various transport and attenuation processes in aquifers. Proper development of these models is critical for long-term stewardship of contaminated sites in the context of predicting uranium source behavior, remediation performance, and off-site risk.« less

  1. Testing Omega P’s 650 KW, 1.3 GHZ Low-Voltage Multi-Beam Klystron for the Project X Pulsed LINAC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fermi Research Alliance; Omega-P Inc.

    Omega-P Inc. had developed a multi beam 1.3 GHz klystron (MBK) for the Project X pulsed linac application. Testing of the klystron require a special hardware such as a modulator, RF components, control system, power supplies, etc, as well as associated infrastructure( electricity, water, safety). This is an expensive part of klystron development for which Omega-P does not have the required equipment. Fermilab will test the MBK at Fermilab site providing contribution to the project all the necessary facilities, infrastructure and manpower for MBK test performance and analysis.

  2. Massachusetts Fuel Cell Bus Project: Demonstrating a Total Transit Solution for Fuel Cell Electric Buses in Boston

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Federal Transit Administration's National Fuel Cell Bus Program focuses on developing commercially viable fuel cell bus technologies. Nuvera is leading the Massachusetts Fuel Cell Bus project to demonstrate a complete transit solution for fuel cell electric buses that includes one bus and an on-site hydrogen generation station for the Massachusetts Bay Transportation Authority (MBTA). A team consisting of ElDorado National, BAE Systems, and Ballard Power Systems built the fuel cell electric bus, and Nuvera is providing its PowerTap on-site hydrogen generator to provide fuel for the bus.

  3. Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frothingham, David; Barker, Michelle; Buechi, Steve

    2013-07-01

    Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recoverymore » and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)« less

  4. 76 FR 79675 - Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting On January 18, 2012, Office of Energy Projects staff will hold a site visit and technical meeting for the proposed Pomperaug Hydro Project (FERC...

  5. The commercial feasibility of underground coal gasification in southern Thailand

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solc, J.; Young, B.C.; Harju, J.A.

    Underground Coal Gasification (UCG) is a clean coal technology with the commercial potential to provide low- or medium-Btu gas for the generation of electric power. While the abundance of economic coal and natural gas reserves in the United States of America (USA) has delayed the commercial development of this technology in the USA, potential for commercial development of UCG-fueled electric power generation currently exists in many other nations. Thailand has been experiencing sustained economic growth throughout the past decade. The use of UCG to provide electric power to meet the growing power demand appears to have commercial potential. A projectmore » to determine the commercial feasibility of UCG-fueled electric power generation at a site in southern Thailand is in progress. The objective of the project is to determine the commercial feasibility of using UCG for power generation in the Krabi coal mining area located approximately 1,000 kilometers south of Bangkok, Thailand. The project team has developed a detailed methodology to determine the technical feasibility, environmental acceptability, and commercial economic potential of UCG at a selected site. In the methodology, hydrogeologic conditions of the coal seam and surrounding strata are determined first. These results and information describing the local economic conditions are then used to assess the commercial potential of the UCG application. The methodology for evaluating the Krabi UCG site and current project status are discussed in this paper.« less

  6. Field-Integrated Studies of Long-Term Sustainability of Chromium Bioreduction at Hanford 100H Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Long, Philip E.

    2006-06-01

    The objectives of the project are to investigate coupled hydraulic, geochemical, and microbial conditions, and to determine the critical biogeochemical parameters necessary to maximize the extent of Cr(VI) bioreduction and minimize Cr(III) reoxidation in groundwater. Specific goals of the project are as follows: (1) Field testing and monitoring of Cr(VI) bioreduction in ground water and its transformation into insoluble species of Cr(III) at the Hanford 100H site, to develop the optimal strategy of water sampling for chemical, microbial, stable isotope analyses, and noninvasive geophysical monitoring; (2) Bench-scale flow and transport investigations using columns of undisturbed sediments to obtain diffusion andmore » kinetic parameters needed for the development of a numerical model, predictions of Cr(VI) bioreduction, and potential of Cr(III) reoxidation; and (3) Development of a multiphase, multi-component 3D reactive transport model and a code, TOUGHREACT-BIO, to predict coupled biogeochemical-hydrological processes associated with bioremediation, and to calibrate and validate the developed code based on the results of bench-scale and field-scale Cr(VI) biostimulation experiments in ground water at the Hanford Site.« less

  7. Development of a Comprehensive Plan for Scientific Research, Exploration, and Design: Creation of an Undergroung Radioactive Waste Isloation Facility at the Nizhnekansky Rock Massif

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jardine, L J

    2005-06-15

    ISTC Partner Project No.2377, ''Development of a General Research and Survey Plan to Create an Underground RW Isolation Facility in Nizhnekansky Massif'', funded a group of key Russian experts in geologic disposal, primarily at Federal State Unitary Enterprise All-Russian Design and Research Institute of Engineering Production (VNIPIPT) and Mining Chemical Combine Krasnoyarsk-26 (MCC K-26) (Reference 1). The activities under the ISTC Partner Project were targeted to the creation of an underground research laboratory which was to justify the acceptability of the geologic conditions for ultimate isolation of high-level waste in Russia. In parallel to this project work was also undermore » way with Minatom's financial support to characterize alternative sections of the Nizhnekansky granitoid rock massif near the MCC K-26 site to justify the possibility of creating an underground facility for long-term or ultimate isolation of radioactive waste (RW) and spent nuclear fuel (SNF). (Reference 2) The result was a synergistic, integrated set of activities several years that advanced the geologic repository site characterization and development of a proposed underground research laboratory better than could have been expected with only the limited funds from ISTC Partner Project No.2377 funded by the U.S. DOE-RW. There were four objectives of this ISTC Partner Project 2377 geologic disposal work: (1) Generalize and analyze all research work done previously at the Nizhnekansky granitoid massif by various organizations; (2) Prepare and issue a declaration of intent (DOI) for proceeding with an underground research laboratory in a granite massif near the MCC K-26 site. (The DOI is similar to a Record of Decision in U.S. terminology). (3) Proceeding from the data obtained as a result of scientific research and exploration and design activities, prepare a justification of investment (JOI) for an underground research laboratory in as much detail as the available site characterization data allow. Consider the possibility of the substantiated selection of a specific site for the underground laboratory at this stage. (The JOI is similar to an advanced conceptual design or preliminary design in U.S. terminology). (4) Perform a preliminary safety assessment of the geologic isolation of radioactive waste and unreprocessable spent nuclear fuel (SNF) in the Nizhnekansky massif. Significant progress has been made toward fulfilling the joint project objectives. The results were documented in a series of quarterly reports and one final report over a period of {approx}2 3/4 years.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

  9. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  10. GSFC Supplier Surveillance

    NASA Technical Reports Server (NTRS)

    Kelly, Michael P.

    2011-01-01

    Topics covered include: Develop Program/Project Quality Assurance Surveillance Plans The work activities performed by the developer and/or his suppliers are subject to evaluation and audit by government-designated representatives. CSO supports project by selecting on-site supplier representative s by one of several methods: (1) a Defense Contract Management Agency (DCMA) person via a Letter Of Delegation (LOD), (2) an independent assurance contractor (IAC) via a contract Audits, Assessments, and Assurance (A3) Contract Code 300 Mission Assurance Support Contract (MASC)

  11. School-site decision making in multicultural education: An Australian perspective

    NASA Astrophysics Data System (ADS)

    Kennedy, Kerry J.

    1985-12-01

    This paper examines a number of issues related to multicultural education and curriculum change. It focuses on school-level projects that were developed in Western Australian schools from 1979-1981. The results of the research raised the following points: teachers viewed multicultural education as a psycho-social rather than a socio-political phenomenon; the aims of multicultural education were seen to be best achieved by the collection of specific resource material; on-site implementation of the projects often led to changes being made to the original intentions of the project designers; qualitative research techniques proved more sensitive in portraying and consequently understanding the complexities associated with project implementation, and, finally, it seemed clear that more emphasis should be placed on understanding the role of the teacher as a policy mediator. It is at the school level that the final decisions are made about national policy intentions.

  12. Sites of Contention and Critical Thinking in the Elementary Art Classroom: A Political Cartooning Project

    ERIC Educational Resources Information Center

    Rolling, James Haywood, Jr.

    2008-01-01

    In this paper, the author explores the concept of childhood as a social category that impedes the perception of youngsters as critical thinkers in a visual culture. The author interrogates regularities within contemporary public schooling that work to represent the intellectual and cultural development of youngsters as the project of adult…

  13. Social Networking in an Intensive English Program Classroom: A Language Socialization Perspective

    ERIC Educational Resources Information Center

    Reinhardt, Jonathon; Zander, Victoria

    2011-01-01

    This ongoing project seeks to investigate the impact, inside and outside of class, of instruction focused on developing learner awareness of social-networking site (SNS) use in an American Intensive English Program (IEP). With language socialization as an interpretative framework (Duff, in press; Ochs, 1988; Watson-Gegeo, 2004), the project uses a…

  14. A Collaborative Model to Identify and Implement Applications of Research on Effective Teaching to Preservice/Inservice Teacher Education.

    ERIC Educational Resources Information Center

    Ponzio, Richard

    Mills College (California) was one of three sites selected to participate in a project designed to apply and use research in elementary teacher education. The project trained student teachers and cooperating teachers to measure academic learning time and active teacher behaviors with instruments developed by recent research on teacher…

  15. Developing Effective Schools: Indicators of Educational Success As Roadmarks to Improvement.

    ERIC Educational Resources Information Center

    Jolly, Deborah V.; And Others

    The first 3 years of a 4-year project to plan and implement school change using a school improvement strategy in five low income, rural, resource-bound school sites are described in this report. One school from each of the following states--Texas, New Mexico, Oklahoma, Arkansas, and Louisiana--participated in the project. Extreme diversity…

  16. Evaluating the Acceptability and Feasibility of Project ACCEPT: An Intervention for Youth Newly Diagnosed with HIV

    ERIC Educational Resources Information Center

    Hosek, Sybil G.; Lemos, Diana; Harper, Gary W.; Telander, Kyle

    2011-01-01

    Given the potential for negative psychosocial and medical outcomes following an HIV diagnosis, Project ACCEPT, a 12-session behavioral intervention, was developed and pilot-tested for youth (aged 16-24) newly diagnosed with HIV. Fifty participants recently diagnosed with HIV were enrolled from 4 sites selected through the Adolescent Medicine…

  17. Web-Based Assessment Tool for Communication and Active Listening Skill Development

    ERIC Educational Resources Information Center

    Cheon, Jongpil; Grant, Michael

    2009-01-01

    The website "Active Listening" was developed within a larger project--"Interactive Web-based training in the subtleties of communication and active listening skill development." The Active Listening site aims to provide beginning counseling psychology students with didactic and experimental learning activities and interactive tests so that…

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigeant, Paul; Miller, John; Howes, Brian

    Project Goals: The funding provided by this contract supported the following activities: A) Test Site Development; B) Seed Grant Funded Technology Development; C) Stakeholder Activities The first year of funding was dedicated to the formation of the NE MREC University Consortium which was comprised of University of Massachusetts Dartmouth (UMD) and Amherst (UMA), Massachusetts Institute of Technology (MIT), Woods Hole Oceanographic Institution (WHOI), University of New Hampshire (UNH), and the University of Rhode Island (URI). The consortium worked together to encourage research and promote benefits of obtaining energy from ocean wind, waves, tides and currents. In addition, NE MREC’s goalmore » was to fund projects aimed at potential test sites with the first year funding going to studies of the potential for tidal device testing in Muskeget Channel, at the General Sullivan Bridge in New Hampshire, and for wave device testing at the proposed National Offshore Renewable Energy Innovation Zone (NOREIZ) located off the Massachusetts coast. The project spanned 4.5 years and addressed three specific tasks that are interrelated but also served as independent investigations.« less

  19. a Heritage Inventory for Documenting Endangered Archaeology in the Middle East and North Africa

    NASA Astrophysics Data System (ADS)

    Sheldrick, N.; Zerbini, A.

    2017-08-01

    The heritage of the Middle East and North Africa is under growing threat from a variety of factors, including agricultural expansion, urban development, looting, and conflict. Recording and documenting this heritage is therefore a key priority to aid heritage practitioners tasked with protecting sites and evaluating their condition on the ground. The Endangered Archaeology in the Middle East and North Africa (EAMENA) project has developed a methodology for the identification, documentation, analysis, and monitoring of sites across the region to aid heritage professionals in these efforts. The project uses remote sensing techniques along with traditional archaeological research and prospection methods to collect data, which are stored and managed in a custom-designed database adapted from open-source Arches v.3 software, using CIDOC CRM standards and controlled vocabularies. In addition to these activities, the EAMENA project has initiated an international conference series and training workshops to support and establish partnerships with heritage professionals and institutions across the region.

  20. Palos Crater

    NASA Technical Reports Server (NTRS)

    2002-01-01

    [figure removed for brevity, see original site]

    Palos Crater has been suggested as a future landing site for Mars Missions. This crater has a channel called Tinto Vallis, which enters from the south. This site was suggested as a landing site because it may contain lake deposits. Palos Crater is named in honor of the port city in Spain from which Christopher Columbus sailed on his way to the New World in August of 1492. The floor of Palos Crater appears to be layered in places providing further evidence that this site may in fact have been the location of an ancient lake.

    Note: this THEMIS visual image has not been radiometrically nor geometrically calibrated for this preliminary release. An empirical correction has been performed to remove instrumental effects. A linear shift has been applied in the cross-track and down-track direction to approximate spacecraft and planetary motion. Fully calibrated and geometrically projected images will be released through the Planetary Data System in accordance with Project policies at a later time.

    NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in collaboration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

  1. Ranking of Sites for Installation of Hydropower Plant Using MLP Neural Network Trained with GA: A MADM Approach

    PubMed Central

    Singh, Kh. Manglem; Khelchandra, Thongam; Mehta, R. K.

    2017-01-01

    Every energy system which we consider is an entity by itself, defined by parameters which are interrelated according to some physical laws. In recent year tremendous importance is given in research on site selection in an imprecise environment. In this context, decision making for the suitable location of power plant installation site is an issue of relevance. Environmental impact assessment is often used as a legislative requirement in site selection for decades. The purpose of this current work is to develop a model for decision makers to rank or classify various power plant projects according to multiple criteria attributes such as air quality, water quality, cost of energy delivery, ecological impact, natural hazard, and project duration. The case study in the paper relates to the application of multilayer perceptron trained by genetic algorithm for ranking various power plant locations in India. PMID:28331490

  2. Ranking of Sites for Installation of Hydropower Plant Using MLP Neural Network Trained with GA: A MADM Approach.

    PubMed

    Shimray, Benjamin A; Singh, Kh Manglem; Khelchandra, Thongam; Mehta, R K

    2017-01-01

    Every energy system which we consider is an entity by itself, defined by parameters which are interrelated according to some physical laws. In recent year tremendous importance is given in research on site selection in an imprecise environment. In this context, decision making for the suitable location of power plant installation site is an issue of relevance. Environmental impact assessment is often used as a legislative requirement in site selection for decades. The purpose of this current work is to develop a model for decision makers to rank or classify various power plant projects according to multiple criteria attributes such as air quality, water quality, cost of energy delivery, ecological impact, natural hazard, and project duration. The case study in the paper relates to the application of multilayer perceptron trained by genetic algorithm for ranking various power plant locations in India.

  3. Student Involvement with the Regionally Important Geomorphological Site (RIGS) Scheme: An Opportunity to Learn Geomorphology and Gain Transferable Skills.

    ERIC Educational Resources Information Center

    McEwen, Lindsey

    1996-01-01

    Outlines student involvement with a conservation project that aims to develop a Regionally Important Geological/Geomorphological Site network (RIGS) at a county level in the United Kingdom. Emphasis is placed on identifying, describing, evaluating, and documenting land forms of educational, research, historical, and/or aesthetic value. (MJP)

  4. The Use of Elgg Social Networking Tool for Students' Project Peer-Review Activity

    ERIC Educational Resources Information Center

    Samardzija, Ana Coric; Bubas, Goran

    2014-01-01

    Numerous e-learning 2.0 studies have advocated the use of social networking sites for educational purposes, but only a few of them have observed social networking sites as an instrument for specific learner skill development. This paper discusses a study which addresses the motivation and challenges associated with the introduction of the social…

  5. Ensembl 2002: accommodating comparative genomics.

    PubMed

    Clamp, M; Andrews, D; Barker, D; Bevan, P; Cameron, G; Chen, Y; Clark, L; Cox, T; Cuff, J; Curwen, V; Down, T; Durbin, R; Eyras, E; Gilbert, J; Hammond, M; Hubbard, T; Kasprzyk, A; Keefe, D; Lehvaslaiho, H; Iyer, V; Melsopp, C; Mongin, E; Pettett, R; Potter, S; Rust, A; Schmidt, E; Searle, S; Slater, G; Smith, J; Spooner, W; Stabenau, A; Stalker, J; Stupka, E; Ureta-Vidal, A; Vastrik, I; Birney, E

    2003-01-01

    The Ensembl (http://www.ensembl.org/) database project provides a bioinformatics framework to organise biology around the sequences of large genomes. It is a comprehensive source of stable automatic annotation of human, mouse and other genome sequences, available as either an interactive web site or as flat files. Ensembl also integrates manually annotated gene structures from external sources where available. As well as being one of the leading sources of genome annotation, Ensembl is an open source software engineering project to develop a portable system able to handle very large genomes and associated requirements. These range from sequence analysis to data storage and visualisation and installations exist around the world in both companies and at academic sites. With both human and mouse genome sequences available and more vertebrate sequences to follow, many of the recent developments in Ensembl have focusing on developing automatic comparative genome analysis and visualisation.

  6. Candidate locations for SPS rectifying antennas

    NASA Technical Reports Server (NTRS)

    Eberhardt, A. W.

    1977-01-01

    The feasibility of placing 120 Satellite Power System (SPS) rectifying antenna (rectenna) sites across the U.S. was studied. An initial attempt is made to put two land sites in each state using several land site selection criteria. When only 69 land sites are located, it is decided to put the remaining sites in the sea and sea site selection criteria are identified. An estimated projection of electrical demand distribution for the year 2000 is then used to determine the distribution of these sites along the Pacific, Atlantic, and Gulf Coasts. A methodology for distributing rectenna sites across the country and for fine-tuning exact locations is developed, and recommendations on rectenna design and operations are made.

  7. Multiple site receptor modeling with a minimal spanning tree combined with a Kohonen neural network

    NASA Astrophysics Data System (ADS)

    Hopke, Philip K.

    1999-12-01

    A combination of two pattern recognition methods has been developed that allows the generation of geographical emission maps form multivariate environmental data. In such a projection into a visually interpretable subspace by a Kohonen Self-Organizing Feature Map, the topology of the higher dimensional variables space can be preserved, but parts of the information about the correct neighborhood among the sample vectors will be lost. This can partly be compensated for by an additional projection of Prim's Minimal Spanning Tree into the trained neural network. This new environmental receptor modeling technique has been adapted for multiple sampling sites. The behavior of the method has been studied using simulated data. Subsequently, the method has been applied to mapping data sets from the Southern California Air Quality Study. The projection of a 17 chemical variables measured at up to 8 sampling sites provided a 2D, visually interpretable, geometrically reasonable arrangement of air pollution source sin the South Coast Air Basin.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists,more » a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.« less

  9. Wildlife studies on the Hanford Site: 1993 Highlights report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cadwell, L.L.

    The Pacific Northwest Laboratory (PNL) Wildlife Resources Monitoring Project was initiated by DOE to track the status of wildlife populations to determine whether Hanford operations affected them. The project continues to conduct a census of wildlife populations that are highly visible, economically or aesthetically important, and rare or otherwise considered sensitive. Examples of long-term data collected and maintained through the Wildlife Resources Monitoring Project include annual goose nesting surveys conducted on islands in the Hanford Reach, wintering bald eagle surveys, and fall Chinook salmon redd (nest) surveys. The report highlights activities related to salmon and mollusks on the Hanford Reachmore » of the Columbia River; describes efforts to map vegetation on the Site and efforts to survey species of concern; provides descriptions of shrub-steppe bird surveys, including bald eagles, Canada geese, and hawks; outlines efforts to monitor mule deer and elk populations on the Site; and describes development of a biological database management system.« less

  10. Soliton switching in a site-dependent ferromagnet

    NASA Astrophysics Data System (ADS)

    Senjudarvannan, R.; Sathishkumar, P.; Vijayalakshmi, S.

    2017-02-01

    Switching of soliton in a ferromagnetic medium offers the possibility of developing a new innovative approach for information storage technologies. The nonlinear spin dynamics of a site-dependent Heisenberg ferromagnetic spin chain with Gilbert damping under the influence of external magnetic field is expressed in the form of the Landau-Lifshitz-Gilbert equation in the classical continuum limit. The corresponding evolution equation is developed through stereographic projection technique by projecting the unit sphere of spin onto a complex plane. The exact soliton solutions are constructed by solving the associated evolution equation through the modified extended tanh-function method. The impact of damping and external magnetic field on the magnetic soliton under the invariant inhomogeneity is investigated and finally, the magnetization switching in the form of shape changing solitons are demonstrated.

  11. For a Consciuos Fruition of the Cultural Heritage of Ancient Noto (sicily). Efian Project as Opportunity for Valorisation

    NASA Astrophysics Data System (ADS)

    Barone, Z.; Nuccio, G.

    2017-05-01

    The archaeological site of Ancient Noto is all that remains of one of the most interesting and important cities in the Est part of Sicily. Architecture and political life made Noto a point of reference for the island, expecially in XVI and XVII century, before it was destroyed by a devastating earthquake in 1963. A general project of safeguard, together with archaeological excavations, could hand a great amount of information, archaeological finds, pieces of architecture, that are useful to understand the site, known as a "Sicilian Pompei". Our intervention has the aim to describe the importance of EFIAN (Experimental Fruition Ingenious Ancient Noto). The project is carried out as a collaboration between Palermo University, Catania University, SIQUILLIYA s.r.l. and Service & Advice s.r.l.. The project answers to the need of improving the valorisation of the site, according to the principles of Italian Code for Cultural Heritage and Landscape. EFIAN's purpose is that of improving public's sensibilisation, to open lines of research and restauration of monuments. The working method is based on the strong relationship established between History, Architectonic Relief, Restauration, and Study of ancient technics of construction linked to the territory. The research is supported by new generation technologies. Datas are used to build digital reconstructions of ruins in the shape of virtual anastylosis and digital reconstruction of whole buildings. Four different sites have been studied during the project development.

  12. Phase I Archaeological Investigation Cultural Resources Survey, Hawaii Geothermal Project, Makawao and Hana Districts, South Shore of Maui, Hawaii (DRAFT )

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erkelens, Conrad

    1994-03-01

    This report details the archaeological investigation of a 200 foot wide sample corridor extending approximately 9 miles along the southern portion of Maui within the present districts of Hana and Makawao. A total of 51 archaeological sites encompassing 233 surface features were documented. A GPS receiver was used to accurately and precisely plot locations for each of the documented sites. Analysis of the locational information suggests that archaeological sites are abundant throughout the region and only become scarce where vegetation has been bulldozed for ranching activities. At the sea-land transition points for the underwater transmission cable, both Ahihi Bay andmore » Huakini Bay are subjected to seasonal erosion and redeposition of their boulder shorelines. The corridor at the Ahihi Bay transition point runs through the Moanakala Village Complex which is an archaeological site on the State Register of Historic Places within a State Natural Area Reserve. Numerous other potentially significant archaeological sites lie within the project corridor. It is likely that rerouting of the corridor in an attempt to avoid known sites would result in other undocumented sites located outside the sample corridor being impacted. Given the distribution of archaeological sites, there is no alternative route that can be suggested that is likely to avoid encountering sites. A total of twelve charcoal samples were obtained for potential taxon identification and radiocarbon analysis. Four of these samples were subsequently submitted for dating and species identification. Bird bone from various locations within a lava tube were collected for identification. Sediment samples for subsequent pollen analysis were obtained from within two lava tubes. With these three sources of information it is hoped that paleoenvironmental data can be recovered that will enable a better understanding of the setting for Hawaiian habitation of the area. A small test unit was excavated at one habitation site. Charcoal, molluscan and fish remains, basalt tools, and other artifacts were recovered. This material, while providing an extremely small sample, will greatly enhance our understanding of the use of the area. Recommendations regarding the need for further investigation and the preservation of sites within the project corridor are suggested. All sites within the project corridor must be considered potentially significant at this juncture. Further archaeological investigation consisting of a full inventory survey will be required prior to a final assessment of significance for each site and the development of a mitigation plan for sites likely to be impacted by the Hawaii Geothermal Project.« less

  13. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    NASA Astrophysics Data System (ADS)

    Hatmoko, Jati Utomo Dwi; Hidayat, Arif; Setiawati, Apsari; Prasetyo, Stefanus Catur Adi

    2018-02-01

    Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG) emissions, to quantify them in terms of carbon dioxide equivalents (CO2e) as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31%) off-site activities and 36.640 tonnes CO2e (51.687%) on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%), and material transportation accounted 24.921 (35.155%). These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  14. Comprehensive Renewable Energy Feasibility Study for the Makah Indian Tribe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RobertLynette; John Wade; Larry Coupe

    The purpose of this project was to determine the technical feasibility, economic viability, and potential impacts of installing and operating a wind power station and/or small hydroelectric generation plants on the Makah reservation. The long-term objective is to supply all or a portion of Tribe's electricity from local, renewable energy sources in order to reduce costs, provide local employment, and reduce power outages. An additional objective was for the Tribe to gain an understanding of the requirements, costs, and benefits of developing and operating such plants on the reservation. The Makah Indian Reservation, with a total land area of forty-sevenmore » square miles, is located on the northwestern tip of the Olympic Peninsula in Washington State. Four major watersheds drain the main Reservation areas and the average rainfall is over one hundred inches per year. The reservation's west side borders the Pacific Ocean, but mostly consists of rugged mountainous terrain between 500 and 1,900 feet in elevation. Approximately 1,200 tribal members live on the Reservation and there is an additional non-Indian residential population of about 300. Electric power is provided by the Clallam County PUD. The annual usage on the reservation is approximately 16,700 mWh. Project Work Wind Energy--Two anemometer suites of equipment were installed on the reservation and operated for a more than a year. An off-site reference station was identified and used to project long-term wind resource characteristics at the two stations. Transmission resources were identified and analyzed. A preliminary financial analysis of a hypothetical wind power station was prepared and used to gauge the economic viability of installation of a multi-megawatt wind power station. Small Hydroelectric--Two potential sites for micro/small-hydro were identified by analysis of previous water resource studies, topographical maps, and conversations with knowledgeable Makah personnel. Field trips were conducted to collect preliminary site data. A report was prepared by Alaska Power & Telephone (Larry Coupe) including preliminary layouts, capacities, potential environmental issues, and projected costs. Findings and Conclusions Wind Energy The average wind resources measured at both sites were marginal, with annual average wind speeds of 13.6-14.0 mph at a 65-meter hub height, and wind shears of 0.08-0.13. Using GE 1.5 MW wind turbines with a hub height of 65 meters, yields a net capacity factor of approximately 0.19. The cost-of-energy for a commercial project is estimated at approximately 9.6 cents per kWh using current costs for capital and equipment prices. Economic viability for a commercial wind power station would require a subsidy of 40-50% of the project capital cost, loans provided at approximately 2% rate of interest, or a combination of grants and loans at substantially below market rates. Recommendations: Because the cost-of-energy from wind power is decreasing, and because there may be small pockets of higher winds on the reservation, our recommendation is to: (1) Leave one of the two anemometer towers, preferably the 50-meter southern unit MCC, in place and continue to collect data from this site. This site would serve as an excellent reference anemometer for the Olympic Peninsula, and, (2) If funds permit, relocate the northern tower (MCB) to a promising small site closer to the transmission line with the hope of finding a more energetic site that is easier to develop. Small Hydroelectric There are a very limited number of sites on the reservation that have potential for economical hydroelectric development, even in conjunction with water supply development. Two sites emerged as the most promising and were evaluated: (1) One utilizing four creeks draining the north side of the Cape Flattery peninsula (Cape Creeks), and (2) One on the Waatch River to the south of Neah Bay. The Cape Creeks site would be a combination water supply and 512 kW power generation facility and would cost a approximately $11,100,000. Annual power generation would be approximately 1,300,000 kWh and the plant would have a cost-of-energy of approximately 65 cents per kWh, substantially above market rates. The Waatch site would also be a combination water supply and power generation facility. It would have a rated capacity of 935 kW and would cost approximately $16,400,000. Annual power generation would be approximately 3,260,000 kWh and the plant would have a cost-of-energy of approximately 38 cents per kWh, also substantially above market rates. Recommendation: Stand-alone hydroelectric development is not commercially viable. The Tribal Council should not pursue development of hydroelectric facilities on the Makah Reservation unless they are an adjunct to a water supply development, and the water supply systems absorbs almost all the capital cost of the project.« less

  15. Technical approaches to characterizing and cleaning up iron and steel mill sites under the brownfields initiative. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    EPA has developed this guide to provide decision-makers, such as city planners, private sector developers, and other involved in redeveloping brownfields, with a better understanding of the technical issues involved in assessing and cleaning up iron and steel mill sites so they can make the most informed decisions possible. This overview of the technical process involved in assessing and cleaning up brownfields sites can assist planners in making decisions at various stages of the project. An understanding of land use and industrial processes conducted in the past at a site can help the planner to conceptualize the site and identifymore » likely areas of contamination that may require cleanup. Numerous resources are suggested to facilitate characterization of the site and consideration of cleanup technologies.« less

  16. OceanSITES format and Ocean Observatory Output harmonisation: past, present and future

    NASA Astrophysics Data System (ADS)

    Pagnani, Maureen; Galbraith, Nan; Diggs, Stephen; Lankhorst, Matthias; Hidas, Marton; Lampitt, Richard

    2015-04-01

    The Global Ocean Observing System (GOOS) initiative was launched in 1991, and was the first step in creating a global view of ocean observations. In 1999 oceanographers at the OceanObs conference envisioned a 'global system of eulerian observatories' which evolved into the OceanSITES project. OceanSITES has been generously supported by individual oceanographic institutes and agencies across the globe, as well as by the WMO-IOC Joint Technical Commission for Oceanography and Marine Meteorology (under JCOMMOPS). The project is directed by the needs of research scientists, but has a strong data management component, with an international team developing content standards, metadata specifications, and NetCDF templates for many types of in situ oceanographic data. The OceanSITES NetCDF format specification is intended as a robust data exchange and archive format specifically for time-series observatory data from the deep ocean. First released in February 2006, it has evolved to build on and extend internationally recognised standards such as the Climate and Forecast (CF) standard, BODC vocabularies, ISO formats and vocabularies, and in version 1.3, released in 2014, ACDD (Attribute Convention for Dataset Discovery). The success of the OceanSITES format has inspired other observational groups, such as autonomous vehicles and ships of opportunity, to also use the format and today it is fulfilling the original concept of providing a coherent set of data from eurerian observatories. Data in the OceanSITES format is served by 2 Global Data Assembly Centres (GDACs), one at Coriolis, in France, at ftp://ftp.ifremer.fr/ifremer/oceansites/ and one at the US NDBC, at ftp://data.ndbc.noaa.gov/data/oceansites/. These two centres serve over 26,800 OceanSITES format data files from 93 moorings. The use of standardised and controlled features enables the files held at the OceanSITES GDACs to be electronically discoverable and ensures the widest access to the data. The OceanSITES initiative has always been truly international, and in Europe the first project to include OceanSITES as part of its outputs was ANIMATE(2002-2005), where 3 moorings and 5 partners shared equipment, methods and analysis effort and produced their final outputs in OceanSITES format. Subsequent European projects, MERSEA(2004-2008) and EuroSITES (2008-2011) built on that early success and the current European project FixO3 encompasses 23 moorings and 29 partners, all of whom are committed to producing data in OceanSITES format. The global OceanSITES partnership continues to grow; in 2014 the Australian Integrated Marine Observing System ( IMOS) started delivering data to the OceanSITES FTP, and files and India, South Korea and Japan are also active members of the OceanSITES community. As illustrated in figure 1 the OceanSITES sites cover the entire globe, and the format has now matured enough to be taken up by other user groups. GO-SHIP, a global, ship-based hydrographic program, shares technical management with OceanSITES through JCOMMOPS, and has its roots in WOCE Hydrography. This program complements OceanSITES and directly contributes to the mooring data holdings by providing repeated CTD and bottle profiles at specific locations. GO-SHIP hydrographic data adds a source of timeseries profiles and are provided in the OceanSITES file structure to facilitate full data interoperability. GO-SHIP has worked closely with the OceanSITES program, and this interaction has produced an unexpected side benefit - all data in the GO-SHIP database will be offered the robust and CF-compliant OceanSITES format beginning in 2015. The MyOcean European ocean monitoring and forecasting project has been in existence since 2009, and has successfully used the OceanSITES format as a unifying paradigm. MyOcean daily receives hundreds of data files from across Europe, and distributes the data from drifter buoys, moorings and tide gauges in OceanSITES format. These in-situ data are essential for both model verification points and for assimilation into the models. The use of the OceanSITES format now exceeds the hopes and expectations of the original OceanObs vision in 1999 and the stewardship of the format development, extension and documentation is in the expert care of the international OceanSITES Data Management Team. PIC Figure 1

  17. Spent nuclear fuel project high-level information management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less

  18. Feasibility Study of Economics and Performance of Geothermal Power Generation at the Lakeview Uranium Mill Site in Lakeview, Oregon. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hillesheim, M.; Mosey, G.

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Lakeview Uranium Mill site in Lakeview, Oregon, for a feasibility study of renewable energy production. The EPA contracted with the National Renewable Energy Laboratory (NREL) to provide technical assistance for the project. The purpose of this report is to describe an assessment of the site for possible development of a geothermal power generation facility and to estimate the cost, performance, and site impacts for the facility. In addition, the report recommends development pathways that could assist in the implementation of a geothermal power systemmore » at the site.« less

  19. Building Opportunities for Environmental Education Through Student Development of Cyberinfrastructure

    NASA Astrophysics Data System (ADS)

    Moysey, S. M.; Boyer, D. M.; Mobley, C.; Byrd, V. L.

    2014-12-01

    It is increasingly common to utilize simulations and games in the classroom, but learning opportunities can also be created by having students construct these cyberinfrastructure resources themselves. We outline two examples of such projects completed during the summer of 2014 within the NSF ACI sponsored REU Site: Research Experiences for Undergraduates in Collaborative Data Visualization Applications at Clemson University (Award 1359223). The first project focuses on the development of immersive virtual reality field trips of geologic sites using the Oculus Rift headset. This project developed a platform which will allow users to navigate virtual terrains derived from real-world data obtained from the US Geological Survey and Google Earth. The system provides users with the ability to partake in an interactive first-person exploration of a region, such as the Grand Canyon, and thus makes an important educational contribution for students without access to these environmental assets in the real world. The second project focused on providing players visual feedback about the sustainability of their practices within the web-based, multiplayer watershed management game Naranpur Online. Identifying sustainability indicators that communicate meaningful information to players and finding an effective way to visualize these data were a primary challenge faced by the student researcher working on this project. To solve this problem the student translated findings from the literature to the context of the game to develop a hierarchical set of relative sustainability criteria to be accessed by players within a sustainability dashboard. Though the REU focused on visualization, both projects forced the students to transform their thinking to address higher-level questions regarding the utilization and communication of environmental data or concepts, thus enhancing the educational experience for themselves and future students.

  20. Students mentoring students in a service-learning clinical supervision experience: an educational case report.

    PubMed

    Lattanzi, Jill Black; Campbell, Sandra L; Dole, Robin L; Palombaro, Kerstin M

    2011-10-01

    Service-learning projects present the opportunity to combine academic skill practice and peer mentorship with meaningful community service. Implicit learning outcomes include an enhanced understanding of social responsibility and professional development-concepts difficult to teach in the classroom. The purpose of this educational case report is to describe the development, application, and outcomes of a service-learning project designed to facilitate peer mentorship and the development of social responsibility. DEVELOPMENT OF THE PROCESS: Widener University mandated that all programs offer student community service opportunities on Martin Luther King Day. In response, the physical therapy program developed a plan to clean and screen assistive and mobility devices and provide blood pressure screening at designated community sites. APPLICATION OF THE PROCESS: All faculty and all members of the first-year and third-year Doctor of Physical Therapy (DPT) classes participated. The students and a faculty member traveled to designated community sites in teams. First-year students were able to practice newly acquired skills under the supervision and peer mentorship of third-year students. Outcomes of the service-learning project were assessed through a tally of services rendered, measurement of curricular goal achievement, a survey of the community partners' satisfaction with the event, and consideration of both first-year and third-year DPT student reflection papers. The service-learning project was effective in meeting a community need, enhancing community partner relationships, fostering student understandings of social responsibility, and creating a valuable peer mentorship experience.

  1. Assessment of the visual landscape impact and dominance of wind tubines in Austria using weighted viewshed maps

    NASA Astrophysics Data System (ADS)

    Schauppenlehner, Thomas; Salak, Boris; Scherhaufer, Patrick; Höltinger, Stefan; Schmidt, Johannes

    2017-04-01

    Due to efficiency reasons and broadly availability of wind, wind energy is in focus of strategies regarding the expansion of renewable energy and energy transition policies. Nevertheless, the dimensions of the wind turbines and rotating dynamics have a significant impact on the landscape scenery and recreation as well as tourism activities. This often leads to local opposition against wind energy projects and is a major criterion regarding the acceptance of wind energy. In the project TransWind, the social acceptance of wind energy is surveyed on the basis of different development scenarios for Austria. Therefore, a GIS-based viewshed indicator was developed to assess the visual impact of different development scenarios as well as the current situation using weighted - regarding distance, amount and masking - viewshed analysis. This weighted viewshed maps for Austria allows a comprehensive evaluation of existing and potential wind energy sites regarding dominance and visual impact and can contribute to the spatial development process of wind energy site. Different regions can be compared and repowering strategies can be evaluated. Due to the large project area, data resolutions, generalized assumptions (e.g. tree heights) and missing data (e.g. solitary trees, small hedges) at local level further analysis are necessary but it supports the assessment of large-scale development scenarios can be identified.

  2. Creating Virtual Fieldwork Experiences of Geoheritage Sites as Educator Professional Development (Invited)

    NASA Astrophysics Data System (ADS)

    Duggan-Haas, D.

    2013-12-01

    Geoheritage sites are identified as such because they include excellent examples of geologic features or processes, or they have played an important role in the development of geologic understandings. These characteristics also make them excellent sites for teaching in the field, for teaching educators about the nature of fieldwork, and for making Virtual Fieldwork Experiences (VFEs, multimedia representations of field sites). Through the NSF-funded Regional and Local Earth (ReaL) Earth Inquiry Project, we have engaged educators in these practices. The nature of geoheritage sites is anomalous -- if this were not the case, the sites would not gain recognition. Anomalous features or processes can be powerful learning tools when placed into comparison with the more mundane, and the Earth system science of sites local to schools is likely to be mundane. By comparing the mundane and the extraordinary, it is hoped we can learn more about both. The professional development (PD) in ReaL Earth Inquiry begins with a face-to-face workshop within the teachers' region at a site that is interesting from an Earth system science perspective. Though we recognize and emphasize that all sites are interesting from an ESS perspective if you know how to look, the sites typically have features worthy of geoheritage designation. PD does not end with the end of the workshop but continues with online study groups where teachers work together to complete the workshop site VFE, and transition to work on VFEs of sites local to their schools. Throughout the program, participants engage in: - mentored fieldwork that pays attention to the skills and knowledge needed to lead fieldwork; - instruction in and use of a wide range of technologies for making VFEs; - study of a coherent conceptual framework connected to the project's driving question: Why does this place look the way it does? - and, use of resources for supporting all of the above The resources include templates for making VFEs and a framework summarized in the attached graphic organizer that features a series of questions that can be productively asked of any field site. By working with educators, we not only produce curriculum resources in the form of VFEs, we also engage in educator PD that produces evidence of its effectiveness, at least in terms of indications that educators are engaged in field study both at the workshop site and after they return home. Production of local VFEs sometimes involves students. The VFE Graphic Organizer, showing a series of questions that may be asked about any site, all under the project's driving question: Why does this place look the way it does?

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cada, Glenn F; Bevelhimer, Mark S

    The development of hydrokinetic (HK) energy projects is under consideration at over 150 sites in large rivers in the United States, including the Mississippi, Ohio, Tennessee, and Atchafalaya Rivers. These waterbodies support numerous fish species that might interact with the HK projects in a variety of ways, e.g., by attraction to or avoidance of project structures. Although many fish species inhabit these rivers (about 172 species in the Mississippi River alone), not all of them will encounter the HK projects. Some species prefer low-velocity, backwater habitats rather than the high-velocity, main channel areas that would be the best sites formore » HK. Other, riverbank-oriented species are weak swimmers or too small to inhabit the main channel for significant periods of time. Some larger, main channel fish species are not known to be attracted to structures. Based on a consideration of habitat preferences, size/swim speed, and behavior, fish species that are most likely to be attracted to HK structures in the main channel include carps, suckers, catfish, white bass, striped bass, smallmouth bass, spotted bass, and sauger. Proper siting of the project in order to avoid sensitive fish populations, backwater and fish nursery habitat areas, and fish migration corridors will likely minimize concerns about fish attraction to or avoidance of HK structures.« less

  4. KSC-2013-3504

    NASA Image and Video Library

    2013-08-30

    CAPE CANAVERAL, Fla. - Workers install a flame deflector at the Shuttle Landing Facility, or SLF, at NASA's Kennedy Space Center in Florida for the Project Morpheus lander. The site is adjacent to a hazard field created to support the project at the north end of the SLF. Testing of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for a free flight at Kennedy later this year. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst obstacles during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html. Photo credit: NASA/Kim Shiflett

  5. KSC-2013-3505

    NASA Image and Video Library

    2013-08-30

    CAPE CANAVERAL, Fla. - Workers install a flame deflector at the Shuttle Landing Facility, or SLF, at NASA's Kennedy Space Center in Florida for the Project Morpheus lander. The site is adjacent to a hazard field created to support the project at the north end of the SLF. Testing of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for a free flight at Kennedy later this year. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst obstacles during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html. Photo credit: NASA/Kim Shiflett

  6. KSC-2013-3503

    NASA Image and Video Library

    2013-08-30

    CAPE CANAVERAL, Fla. - Workers install a flame deflector at the Shuttle Landing Facility, or SLF, at NASA's Kennedy Space Center in Florida for the Project Morpheus lander. The site is adjacent to a hazard field created to support the project at the north end of the SLF. Testing of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for a free flight at Kennedy later this year. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst obstacles during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html. Photo credit: NASA/Kim Shiflett

  7. KSC-2013-3502

    NASA Image and Video Library

    2013-08-30

    CAPE CANAVERAL, Fla. - Workers install a flame deflector at the Shuttle Landing Facility, or SLF, at NASA's Kennedy Space Center in Florida for the Project Morpheus lander. The site is adjacent to a hazard field created to support the project at the north end of the SLF. Testing of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for a free flight at Kennedy later this year. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst obstacles during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html. Photo credit: NASA/Kim Shiflett

  8. KSC-2013-3507

    NASA Image and Video Library

    2013-08-30

    CAPE CANAVERAL, Fla. - Workers install a flame deflector at the Shuttle Landing Facility, or SLF, at NASA's Kennedy Space Center in Florida for the Project Morpheus lander. The site is adjacent to a hazard field created to support the project at the north end of the SLF. Testing of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for a free flight at Kennedy later this year. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst obstacles during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html. Photo credit: NASA/Kim Shiflett

  9. KSC-2013-3501

    NASA Image and Video Library

    2013-08-30

    CAPE CANAVERAL, Fla. - Workers install a flame deflector at the Shuttle Landing Facility, or SLF, at NASA's Kennedy Space Center in Florida for the Project Morpheus lander. The site is adjacent to a hazard field created to support the project at the north end of the SLF. Testing of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for a free flight at Kennedy later this year. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst obstacles during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html. Photo credit: NASA/Kim Shiflett

  10. KSC-2013-3506

    NASA Image and Video Library

    2013-08-30

    CAPE CANAVERAL, Fla. - Workers install a flame deflector at the Shuttle Landing Facility, or SLF, at NASA's Kennedy Space Center in Florida for the Project Morpheus lander. The site is adjacent to a hazard field created to support the project at the north end of the SLF. Testing of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for a free flight at Kennedy later this year. The SLF will provide the lander with the kind of field necessary for realistic testing, complete with rocks, craters and hazards to avoid. Morpheus utilizes an autonomous landing and hazard avoidance technology, or ALHAT, payload that will allow it to navigate to clear landing sites amidst obstacles during its descent. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html. Photo credit: NASA/Kim Shiflett

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rhinefrank, Kenneth; Lamb, Bradford; Prudell, Joseph

    This Project aims to satisfy objectives of the DOE’s Water Power Program by completing a system detailed design (SDD) and other important activities in the first phase of a utility-scale grid-connected ocean wave energy demonstration. In early 2012, Columbia Power (CPwr) had determined that further cost and performance optimization was necessary in order to commercialize its StingRAY wave energy converter (WEC). CPwr’s progress toward commercialization, and the requisite technology development path, were focused on transitioning toward a commercial-scale demonstration. This path required significant investment to be successful, and the justification for this investment required improved annual energy production (AEP) andmore » lower capital costs. Engineering solutions were developed to address these technical and cost challenges, incorporated into a proposal to the US Department of Energy (DOE), and then adapted to form the technical content and statement of project objectives of the resulting Project (DE-EE0005930). Through Project cost-sharing and technical collaboration between DOE and CPwr, and technical collaboration with Oregon State University (OSU), National Renewable Energy Lab (NREL) and other Project partners, we have demonstrated experimentally that these conceptual improvements have merit and made significant progress towards a certified WEC system design at a selected and contracted deployment site at the Wave Energy Test Site (WETS) at the Marine Corps Base in Oahu, HI (MCBH).« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seal, Brian; Huque, Aminul; Rogers, Lindsey

    In 2011, EPRI began a four-year effort under the Department of Energy (DOE) SunShot Initiative Solar Energy Grid Integration Systems - Advanced Concepts (SEGIS-AC) to demonstrate smart grid ready inverters with utility communication. The objective of the project was to successfully implement and demonstrate effective utilization of inverters with grid support functionality to capture the full value of distributed photovoltaic (PV). The project leveraged ongoing investments and expanded PV inverter capabilities, to enable grid operators to better utilize these grid assets. Developing and implementing key elements of PV inverter grid support capabilities will increase the distribution system’s capacity for highermore » penetration levels of PV, while reducing the cost. The project team included EPRI, Yaskawa-Solectria Solar, Spirae, BPL Global, DTE Energy, National Grid, Pepco, EDD, NPPT and NREL. The project was divided into three phases: development, deployment, and demonstration. Within each phase, the key areas included: head-end communications for Distributed Energy Resources (DER) at the utility operations center; methods for coordinating DER with existing distribution equipment; back-end PV plant master controller; and inverters with smart-grid functionality. Four demonstration sites were chosen in three regions of the United States with different types of utility operating systems and implementations of utility-scale PV inverters. This report summarizes the project and findings from field demonstration at three utility sites.« less

  13. Geologic setting of the proposed Fallon FORGE Site, Nevada: Suitability for EGS research and development

    USGS Publications Warehouse

    Faulds, James E.; Blankenship, Douglas; Hinz, Nicholas H.; Sabin, Andrew; Nordquist, Josh; Hickman, Stephen H.; Glen, Jonathan; Kennedy, Mack; Siler, Drew; Robinson-Tait, Ann; Williams, Colin F.; Drakos, Peter; Calvin, Wendy M.

    2015-01-01

    The proposed Fallon FORGE site lies within and adjacent to the Naval Air Station Fallon (NASF) directly southeast of the town of Fallon, Nevada, within the large basin of the Carson Sink in west-central Nevada. The site is located on two parcels that include land owned by the NASF and leased and owned by Ormat Nevada, Inc. The Carson Sink in the vicinity of the Fallon site is covered by Quaternary deposits, including alluvial fan, eolian, and lacustrine sediments. Four wells penetrate the entire Neogene section and bottom in Mesozoic basement. Late Miocene to Quaternary basin-fill sediments are 0.5 to >1 km thick and overlie Oligocene-Miocene volcanic and lesser sedimentary rocks. The volcanic section is 0.5 to 1.0 km thick and dominated by Miocene mafic lavas. The Neogene section rests nonconformably on heterogeneous Mesozoic basement, which consists of Triassic-Jurassic metamorphic rocks intruded by Cretaceous granitic plutons. The structural framework is dominated by a gently west-tilted half graben cut by moderately to steeply dipping N- to NNEstriking normal faults that dip both east and west. Quaternary faults have not been observed within the proposed FORGE site. Fallon was selected for a potential FORGE site due to its extensional tectonic setting, abundance of available data, existing infrastructure, and documented temperatures, permeability, and lithologic composition of potential reservoirs that fall within the ranges specified by DOE for FORGE. Since the early 1970s, more than 45 wells have been drilled for geothermal exploration within the area. Four exploration wells within the FORGE site are available for use in the project. Several additional wells are available for monitoring outside the central FORGE site within the NASF and Ormat lease area, including numerous temperature gradient holes. There is an existing, ten-station micro-seismic earthquake (MEQ) array that has been collecting data since 2001; the MEQ array can be expanded to encompass the entire Fallon project. The well data indicate that a sizeable area (~4.5 km2 ) has adequate temperatures in crystalline basement but lacks sufficient permeability within the proposed FORGE site. There are two possible, competent target formations in Mesozoic basement for stimulation in the FORGE project area: 1) Jurassic felsic metavolcanic rocks/and or metaquartzite; and 2) Cretaceous granitic intrusions. These units make up at least 3 km3 in the project area and have target temperatures of ~175-215o C. The abundant well data and detailed geophysical surveys (e.g., gravity, MT, and seismic reflection) provide significant subsurface control for the site and will permit development of a detailed 3D model. The documented temperatures, low permeability, and basement lithologies, as well as abundant available data facilitate development of a site dedicated to testing and improving new EGS technologies and techniques, thus making Fallon an ideal candidate for FORGE.

  14. A recent Cleanroom success story: The Redwing project

    NASA Technical Reports Server (NTRS)

    Hausler, Philip A.

    1992-01-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  15. Internet-Based Laboratory Activities Designed for Studying the Sun with Satellites

    NASA Astrophysics Data System (ADS)

    Slater, T. F.

    1998-12-01

    Yohkoh Public Outreach Project (YPOP) is a collaborative industry, university, and K-16 project bringing fascinating and dynamic images of the Sun to the public in real-time. Partners have developed an extensive public access and educational WWW site containing more than 100 pages of vibrant images with current information that focuses on movies of the X-ray output of our Sun taken by the Yohkoh Satellite. More than 5 Gb of images and movies are available on the WWW site from the Yohkoh satellite, a joint project of the Institute for Space and Astronautical Sciences (ISAS) and NASA. Using a movie theater motif, the site was created by teams working at Lockheed Martin Advanced Technology Center, Palo Alto, CA in the Solar and Astrophysics Research Group, the Montana State University Solar Physics Research Group, and the Montana State University Conceptual Astronomy and Physics Education Research Group with funding from the NASA Learning Technology Project (LTP) program (NASA LTP SK30G4410R). The Yohkoh Movie Theater Internet Site is found at URL: http://www.lmsal.com/YPOP/ and mirrored at URL: http://solar.physics.montana.edu/YPOP/. In addition to being able to request automated movies for any dates in a 5 Gb on-line database, the user can view automatically updated daily images and movies of our Sun over the last 72 hours. Master science teachers working with the NASA funded Yohkoh Public Outreach Project have developed nine technology-based on-line lessons for K-16 classrooms. These interdisciplinary science, mathematics, and technology lessons integrate Internet resources, real-time images of the Sun, and extensive NASA image databases. Instructors are able to freely access each of the classroom-ready activities. The activities require students to use scientific inquiry skills and manage electronic information to solve problems consistent with the emphasis of the NRC National Science Education Standards.

  16. Lessons Learned for Collaborative Clinical Content Development

    PubMed Central

    Collins, S.A.; Bavuso, K.; Zuccotti, G.; Rocha, R.A.

    2013-01-01

    Background Site-specific content configuration of vendor-based Electronic Health Records (EHRs) is a vital step in the development of standardized and interoperable content that can be used for clinical decision-support, reporting, care coordination, and information exchange. The multi-site, multi-stakeholder Acute Care Documentation (ACD) project at Partners Healthcare Systems (PHS) aimed to develop highly structured clinical content with adequate breadth and depth to meet the needs of all types of acute care clinicians at two academic medical centers. The Knowledge Management (KM) team at PHS led the informatics and knowledge management effort for the project. Objectives We aimed to evaluate the role, governance, and project management processes and resources for the KM team’s effort as part of the standardized clinical content creation. Methods We employed the Center for Disease Control’s six step Program Evaluation Framework to guide our evaluation steps. We administered a forty-four question, open-ended, semi-structured voluntary survey to gather focused, credible evidence from members of the KM team. Qualitative open-coding was performed to identify themes for lessons learned and concluding recommendations. Results Six surveys were completed. Qualitative data analysis informed five lessons learned and thirty specific recommendations associated with the lessons learned. The five lessons learned are: 1) Assess and meet knowledge needs and set expectations at the start of the project; 2) Define an accountable decision-making process; 3) Increase team meeting moderation skills; 4) Ensure adequate resources and competency training with online asynchronous collaboration tools; 5) Develop focused, goal-oriented teams and supportive, consultative service based teams. Conclusions Knowledge management requirements for the development of standardized clinical content within a vendor-based EHR among multi-stakeholder teams and sites include: 1) assessing and meeting informatics knowledge needs, 2) setting expectations and standardizing the process for decision-making, and 3) ensuring the availability of adequate resources and competency training. PMID:23874366

  17. Hydrologic investigations in the Araguaia-Tocantins River basin (Brazil)

    USGS Publications Warehouse

    Snell, Leonard J.

    1979-01-01

    The Araguaia-Tocantins River basin system of central and northern Brazil drains an area of about 770,000 square kilometers and has the potential for supporting large-scale developments. During a short visit to the headquarters of the Interstate Commission for the Araguaia-Tocantins Valley and to several stream-gaging stations in June 1964, the author reviewed the status of the streamflow and meteorological data-collection programs in relation to the streamflow and meteorological data-collection programs in relation to the pressing needs of development project studies. To provide data for areal and project-site studies and for main-stream sites, an initial network of 33 stream gaging stations was proposed, including the 7 stations then in operation. Suggestions were made in regard to operations, staffing and equipment. Organizational responsibilities for operations were found to be divided uncertainly. The Brazilian Meteorological Service had 15 synoptic stations in operation in and near the basin, some in need of reconditioning. Plans were at hand for the addition of 15 sites to the synoptic network and for limited data collection at 27 other sites. The author proposed collection of precipitation data at about 50 other locations to achieve a more representative areal distribution. Temperature, evaporation, and upper-air data sites were suggested to enhance the prospective hydrometeorological studies. (USGS)

  18. Market-Smart Deconstruction and Material Recovery at Brownfield Sites: How to Identify and Reuse Existing Materials Found at Brownfield Sites

    DTIC Science & Technology

    2011-06-01

    efforts to assess , remediate, and sustainably reuse brownfields . This project is based on the premise that communities have finite resources and that the...this work is to develop tools and guidance for brownfields partners to assess the potential of extracting construction material assets from...buildings, structures, and infrastructure on brownfield sites, and to reuse or recycle this material. This assessment will address the physical

  19. An assessment of riparian environmental quality by using butterflies and disturbance susceptibility scores

    USGS Publications Warehouse

    Nelson, S. Mark; Andersen, Douglas C.

    1994-01-01

    The butterfly community at a revegetated riparian site on the lower Colorado River near Parker, Arizona, was compared to that found in a reference riparian site. Data indicated that the herbaceous plant community, which was lacking at the revegetated site, was important to several butterfly taxa. An index using butterfly sensitivity to habitat change (species classified into risk groups) and number of taxa was developed to monitor revegetation projects and to determine restoration effectiveness.

  20. The SKI repository performance assessment project Site-94

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andersson, J.; Dverstorp, B.; Sjoeblom, R.

    1995-12-01

    SITE-94 is a research project conducted as a performance assessment of a hypothetical repository for spent nuclear fuel, but with real pre-excavation data from a real site. The geosphere, the engineered barriers and the processes for radionuclide release and transport comprise an integrated interdependent system, which is described by an influence diagram (PID) that reflects how different Features, Events or Processes (FEPs) inside the system interact. Site evaluation is used to determine information of transport paths in the geosphere and to deliver information on geosphere interaction with the engineered barriers. A three-dimensional geological structure model of the site as wellmore » as alternative conceptual models consistent with the existing hydrological field data, have been analyzed. Groundwater chemistry is evaluated and a model, fairly consistent with the flow model, for the origin of the different waters has been developed. The geological structure model is also used for analyzing the mechanical stability of the site. Several phenomena of relevance for copper corrosion in a repository environment have been investigated. For Reference Case conditions and regardless of flow variability, output is dominated by I-129, which, for a single canister, may give rise to drinking water well doses in the order of 10{sup -6}Sv/yr. Finally, it appears that the procedures involved in the development of influence diagrams may be a promising tool for quality assurance of performance assessments.« less

  1. Geology of Potential Landing Sites for Martian Sample Returns

    NASA Technical Reports Server (NTRS)

    Greeley, Ronald

    2003-01-01

    This project involved the analysis of potential landing sites on Mars. As originally proposed, the project focused on landing sites from which samples might be returned to Earth. However, as the project proceeded, the emphasis shifted to missions that would not include sample return, because the Mars Exploration Program had deferred sample returns to the next decade. Subsequently, this project focused on the study of potential landing sites for the Mars Exploration Rovers.

  2. The effect of an integrated multisector model for achieving the Millennium Development Goals and improving child survival in rural sub-Saharan Africa: a non-randomised controlled assessment.

    PubMed

    Pronyk, Paul M; Muniz, Maria; Nemser, Ben; Somers, Marie-Andrée; McClellan, Lucy; Palm, Cheryl A; Huynh, Uyen Kim; Ben Amor, Yanis; Begashaw, Belay; McArthur, John W; Niang, Amadou; Sachs, Sonia Ehrlich; Singh, Prabhjot; Teklehaimanot, Awash; Sachs, Jeffrey D

    2012-06-09

    Simultaneously addressing multiple Millennium Development Goals (MDGs) has the potential to complement essential health interventions to accelerate gains in child survival. The Millennium Villages project is an integrated multisector approach to rural development operating across diverse sub-Saharan African sites. Our aim was to assess the effects of the project on MDG-related outcomes including child mortality 3 years after implementation and compare these changes to local comparison data. Village sites averaging 35,000 people were selected from rural areas across diverse agroecological zones with high baseline levels of poverty and undernutrition. Starting in 2006, simultaneous investments were made in agriculture, the environment, business development, education, infrastructure, and health in partnership with communities and local governments at an annual projected cost of US$120 per person. We assessed MDG-related progress by monitoring changes 3 years after implementation across Millenium Village sites in nine countries. The primary outcome was the mortality rate of children younger than 5 years of age. To assess plausibility and attribution, we compared changes to reference data gathered from matched randomly selected comparison sites for the mortality rate of children younger than 5 years of age. Analyses were done on a per-protocol basis. This trial is registered with ClinicalTrials.gov, number NCT01125618. Baseline levels of MDG-related spending averaged $27 per head, increasing to $116 by year 3 of which $25 was spent on health. After 3 years, reductions in poverty, food insecurity, stunting, and malaria parasitaemia were reported across nine Millennium Village sites. Access to improved water and sanitation increased, along with coverage for many maternal-child health interventions. Mortality rates in children younger than 5 years of age decreased by 22% in Millennium Village sites relative to baseline (absolute decrease 25 deaths per 1000 livebirths, p=0·015) and 32% relative to matched comparison sites (30 deaths per 1000 livebirths, p=0·033). An integrated multisector approach for addressing the MDGs can produce rapid declines in child mortality in the first 3 years of a long-term effort in rural sub-Saharan Africa. UN Human Security Trust Fund, the Lenfest Foundation, Bill & Melinda Gates Foundation, and Becton Dickinson. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. MPL-Net Measurements of Aerosol and Cloud Vertical Distributions at Co-Located AERONET Sites

    NASA Technical Reports Server (NTRS)

    Welton, Ellsworth J.; Campbell, James R.; Berkoff, Timothy A.; Spinhirne, James D.; Tsay, Si-Chee; Holben, Brent; Starr, David OC. (Technical Monitor)

    2002-01-01

    In the early 1990s, the first small, eye-safe, and autonomous lidar system was developed, the Micropulse Lidar (MPL). The MPL acquires signal profiles of backscattered laser light from aerosols and clouds. The signals are analyzed to yield multiple layer heights, optical depths of each layer, average extinction-to-backscatter ratios for each layer, and profiles of extinction in each layer. In 2000, several MPL sites were organized into a coordinated network, called MPL-Net, by the Cloud and Aerosol Lidar Group at NASA Goddard Space Flight Center (GSFC) using funding provided by the NASA Earth Observing System. tn addition to the funding provided by NASA EOS, the NASA CERES Ground Validation Group supplied four MPL systems to the project, and the NASA TOMS group contributed their MPL for work at GSFC. The Atmospheric Radiation Measurement Program (ARM) also agreed to make their data available to the MPL-Net project for processing. In addition to the initial NASA and ARM operated sites, several other independent research groups have also expressed interest in joining the network using their own instruments. Finally, a limited amount of EOS funding was set aside to participate in various field experiments each year. The NASA Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) project also provides funds to deploy their MPL during ocean research cruises. All together, the MPL-Net project has participated in four major field experiments since 2000. Most MPL-Net sites and field experiment locations are also co-located with sunphotometers in the NASA Aerosol Robotic Network. (AERONET). Therefore, at these locations data is collected on both aerosol and cloud vertical structure as well as column optical depth and sky radiance. Real-time data products are now available from most MPL-Net sites. Our real-time products are generated at times of AERONET aerosol optical depth (AOD) measurements. The AERONET AOD is used as input to our processing routines, which calculate the aerosol layer top height and extinction profile, and our MPL calibration value. A variety of other data products are available or under development. We present an overview of the MPL-Net project and discuss data products useful to the AERONET community. Results from several sites and field experiments will be presented.

  4. Idaho Habitat Evaluation for Off-Site Mitigation Record : Annual Report 1988.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Idaho. Dept. of Fish and Game.

    1990-03-01

    The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead and chinook in the Clearwater and Salmon subbasins since 1984. Projects included in the monitoring are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia Rivers. This monitoring project is also funded under the same authority. A mitigation record is being developed to use actual and potential increases in smolt production as the best measures of benefit frommore » a habitat improvement project. This project is divided into two subprojects: general and intensive monitoring. Primary objectives of the general monitoring subproject are to determine natural production increases due to habitat improvement projects in terms of parr production and to determine natural production status and trends in Idaho. The second objective is accomplished by combining parr density from monitoring and evaluation of BPA habitat projects and from other IDFG management and research activities. The primary objective of the intensive monitoring subproject is to determine the relationships between spawning escapement, parr production, and smolt production in two Idaho streams; the upper Salmon River and Crooked River. Results of the intensive monitoring will be used to estimate mitigation benefits in terms of smolt production and to interpret natural production monitoring in Idaho. 30 refs., 19 figs., 34 tabs.« less

  5. Planning and conducting a multi-institutional project on fatigue.

    PubMed

    Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E

    1998-09-01

    To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.

  6. Aaron Levine | NREL

    Science.gov Websites

    Energy Analysis Center. Areas of Expertise Environmental laws and regulations Energy facility siting and transmission laws and regulations Natural resource leasing and acquisition Legal impacts on renewable energy development Legal and policy research Research Interests Renewable energy and transmission project development

  7. Development of Monitoring and Diagnostic Methods for Robots Used In Remediation of Waste Sites - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, M.

    2000-04-01

    This project is the first evaluation of model-based diagnostics to hydraulic robot systems. A greater understanding of fault detection for hydraulic robots has been gained, and a new theoretical fault detection model developed and evaluated.

  8. Curriculum Guide Construction Cluster.

    ERIC Educational Resources Information Center

    Kline, Ken

    As part of a model construction cluster curriculum development project, this guide was developed and implemented in the Beaverton (Oregon) School District. The curriculum guide contains 16 units covering the following topics: introduction to construction jobs; safety and first aid; blueprint readings; basic mathematics; site work; framing; roofing…

  9. List of Publications, Tools and Resources

    EPA Pesticide Factsheets

    View free technical, promotional, and informational tools and services to assist with the development of landfill gas energy projects. This page contains the publications, brochures, and fact sheets referenced throughout the site.

  10. --No Title--

    Science.gov Websites

    meteorological consultants. However, the data is not suitable for micro-siting potential development projects.< DATA OR PROFITS, WHICH MAY RESULT FROM AN ACTION IN CONTRACT, NEGLIGENCE OR OTHER TORTIOUS CLAIM THAT

  11. Study of Seismic Hazards in the Center of the State of Veracruz, MÉXICO.

    NASA Astrophysics Data System (ADS)

    Torres Morales, G. F.; Leonardo Suárez, M.; Dávalos Sotelo, R.; Mora González, I.; Castillo Aguilar, S.

    2015-12-01

    Preliminary results obtained from the project "Microzonation of geological and hydrometeorological hazards for conurbations of Orizaba, Veracruz, and major sites located in the lower sub-basins: The Antigua and Jamapa" are presented. These project was supported by the Joint Funds CONACyT-Veracruz state government. It was developed a probabilistic seismic hazard assessment (henceforth PSHA) in the central area of Veracruz State, mainly in a region bounded by the watersheds of the rivers Jamapa and Antigua, whit the aim to evaluate the geological and hydrometeorological hazards in this region. The project pays most attention to extreme weather phenomena, floods and earthquakes, in order to calculate the risk induced by previous for landslides and rock falls. In addition, as part of the study, the PSHA was developed considered the site effect in the urban zones of the cities Xalapa and Orizaba; the site effects were incorporated by a standard format proposed in studies of microzonation and its application in computer systems, which allows to optimize and condense microzonation studies in a city. The results obtained from the PSHA are presented through to seismic hazard maps (hazard footprints), exceedance rate curves and uniform hazard spectrum for different spectral ordinates, between 0.01 and 5.0 seconds, associated to selected return periods: 72, 225, 475 and 2475 years.

  12. Technical Support for Contaminated Sites | Science Inventory ...

    EPA Pesticide Factsheets

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled ORD to provide effective technical assistance by ensuring ORD scientists and engineers were accessible to the Agency’s Office and Regional decision makers, including Remedial Project Managers, On-Scene Coordinators, and corrective action staff. Five ORD Technical Support Centers (TSCs) were created to facilitate this technical assistance. Three of the five TSCs are supported by the Sustainable and Healthy Communities Research Program, and are summarized in the poster being presented:• Engineering Technical Support Center (ETSC) in Cincinnati, Ohio• Ground Water Technical Support Center (GWTSC) in Ada, Oklahoma• Site Characterization and Monitoring Technical Support Center (SCMTSC) in Atlanta, GeorgiaOver the past 29 years, the Technical Support Centers have provided numerous influential products to its internal Agency clients and to those at the State level (through the EPA Regions). These products include, but are not limited to the following: Annual TSC reports from the three Centers, a hard-rock mining conference every other year, PRO-UCL software development for site characterization statistics, groundwater modeling using state-of-the-art modeling software, numerical mo

  13. Derivation and Evaluation of a Risk-Scoring Tool to Predict Participant Attrition in a Lifestyle Intervention Project.

    PubMed

    Jiang, Luohua; Yang, Jing; Huang, Haixiao; Johnson, Ann; Dill, Edward J; Beals, Janette; Manson, Spero M; Roubideaux, Yvette

    2016-05-01

    Participant attrition in clinical trials and community-based interventions is a serious, common, and costly problem. In order to develop a simple predictive scoring system that can quantify the risk of participant attrition in a lifestyle intervention project, we analyzed data from the Special Diabetes Program for Indians Diabetes Prevention Program (SDPI-DP), an evidence-based lifestyle intervention to prevent diabetes in 36 American Indian and Alaska Native communities. SDPI-DP participants were randomly divided into a derivation cohort (n = 1600) and a validation cohort (n = 801). Logistic regressions were used to develop a scoring system from the derivation cohort. The discriminatory power and calibration properties of the system were assessed using the validation cohort. Seven independent factors predicted program attrition: gender, age, household income, comorbidity, chronic pain, site's user population size, and average age of site staff. Six factors predicted long-term attrition: gender, age, marital status, chronic pain, site's user population size, and average age of site staff. Each model exhibited moderate to fair discriminatory power (C statistic in the validation set: 0.70 for program attrition, and 0.66 for long-term attrition) and excellent calibration. The resulting scoring system offers a low-technology approach to identify participants at elevated risk for attrition in future similar behavioral modification intervention projects, which may inform appropriate allocation of retention resources. This approach also serves as a model for other efforts to prevent participant attrition.

  14. Using Animals as Teaching Tools: A Handbook for the Zoo Project for Handicapped Children.

    ERIC Educational Resources Information Center

    Lamb, Gerald F.

    The handbook was developed to allow teachers to take advantage of the ideas of persons participating in the Zoo Project for Handicapped Children, in which educationally and mentally handicapped children received language arts instruction organized around the use of animals at the zoo site and in classrooms. The first section of the handbook lists…

  15. 77 FR 38821 - Final Environmental Impact Statement for the Menominee Indian Tribe of Wisconsin's Proposed Fee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Menominee Indian Tribe of Wisconsin's Proposed Fee-to-Trust Transfer and Casino-Hotel Project in the City of... casino-hotel complex. This notice also announces the FEIS is now available for public review. Hard copies... develop a casino-hotel complex. The proposed project is located at the site of the existing Dairyland...

  16. Overview of the Cohort Consortium Vitamin D Pooling Project of Rarer Cancers.

    PubMed

    Helzlsouer, Kathy J

    2010-07-01

    The Cohort Consortium Vitamin D Pooling Project of Rarer Cancers (VDPP) brought together 10 cohorts to conduct a prospective study of the association between vitamin D status, measured as serum concentrations of 25-hydroxyvitamin D (25(OH)D), and the development of 7 rarer cancer sites: endometrial, esophageal, gastric, kidney, non-Hodgkin lymphoma, ovarian, and pancreatic cancers. The cohorts come from 3 continents, with participants from a wide range of latitude who are racially diverse. Across each cancer site, there was no evidence of a protective association between higher concentrations of 25-hydroxyvitamin D (>75 nmol/L) and cancer outcome. An increased risk at very high levels (> or =100 nmol/L) was noted for pancreatic cancer, confirming previous reports. The articles included in this issue detail the overall design and governance of the project, correlates of vitamin D status, and results from the cancer site-specific investigations. The Vitamin D Pooling Project realizes a major goal of consortium efforts, namely, to rigorously test hypotheses for rarer cancer outcomes that may not be adequately addressed in any one prospective cohort study. The results of this study have application for the planning and conduct of intervention trials, especially in determining potential risks.

  17. Projections of change in key ecosystem indicators for planning and management of marine protected areas: An example study for European seas

    NASA Astrophysics Data System (ADS)

    Kay, Susan; Butenschön, Momme

    2018-02-01

    Marine Protected Areas (MPAs) are widely used as tools to maintain biodiversity, protect habitats and ensure that development is sustainable. If MPAs are to maintain their role into the future it is important for managers to understand how conditions at these sites may change as a result of climate change and other drivers, and this understanding needs to extend beyond temperature to a range of key ecosystem indicators. This case study demonstrates how spatially-aggregated model results for multiple variables can provide useful projections for MPA planners and managers. Conditions in European MPAs have been projected for the 2040s using unmitigated and globally managed scenarios of climate change and river management, and hence high and low emissions of greenhouse gases and riverborne nutrients. The results highlight the vulnerability of potential refuge sites in the north-west Mediterranean and the need for careful monitoring at MPAs to the north and west of the British Isles, which may be affected by changes in Atlantic circulation patterns. The projections also support the need for more MPAs in the eastern Mediterranean and Adriatic Sea, and can inform the selection of sites.

  18. Waste picker livelihoods and inclusive neoliberal municipal solid waste management policies: The case of the La Chureca garbage dump site in Managua, Nicaragua.

    PubMed

    Hartmann, Chris

    2018-01-01

    The modernization (i.e. mechanization, formalization, and capital intensification) and enclosure of municipal solid waste management (MSWM) systems threaten waste picker livelihoods. From 2009 to 2013, a major development project, embodying traditional neoliberal policies with inclusive social policies, transformed the Managua, Nicaragua, municipal solid waste site from an open-air dump where as many as 2,000 informal waste pickers toiled to a sanitary landfill. To investigate waste pickers' social and economic condition, including labor characteristics, household income, and poverty incidence, after the project's completion, 146 semi-structured survey questionnaires were administered to four communities adjacent to the landfill and 45 semi-structured interviews were completed with key stakeholders. Findings indicate that hundreds of waste pickers were displaced by the project, employment benefits from the project were unevenly distributed by neighborhood, and informal waste picking endures due to persistent impoverishment, thereby contributing to continued social and economic marginalization and environmental degradation. The findings highlight the limitations of inclusive neoliberal development efforts to transform MSWM in a low-income country. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Engaging and Empowering the National Park Service to apply Earth Observations to Management Decisions

    NASA Astrophysics Data System (ADS)

    Clayton, A.; Ross, K. W.; Crepps, G.; Childs-Gleason, L. M.; Ruiz, M. L.; Rogers, L.; Allsbrook, K. N.

    2017-12-01

    Since 2015, the NASA DEVELOP National Program has partnered with the National Park Service (NPS) engaging more than 120 program participants, working on over 22 projects across approximately 27 unique park units. These projects examined a variety of cultural and environmental concerns facing the NPS including landscape disturbance, invasive species mapping, archaeological site preservation, and water resources monitoring. DEVELOP, part of NASA's Applied Sciences' Capacity Building program, conducts 10-week feasibility projects which demonstrate the utility of NASA's Earth observations as an additional tool for decision-making processes. This presentation will highlight several of these projects and discuss the progress of capacity building working with individual, regional, and institutional elements within the National Park Service.

  20. Overview of software development at the parabolic dish test site

    NASA Technical Reports Server (NTRS)

    Miyazono, C. K.

    1985-01-01

    The development history of the data acquisition and data analysis software is discussed. The software development occurred between 1978 and 1984 in support of solar energy module testing at the Jet Propulsion Laboratory's Parabolic Dish Test Site, located within Edwards Test Station. The development went through incremental stages, starting with a simple single-user BASIC set of programs, and progressing to the relative complex multi-user FORTRAN system that was used until the termination of the project. Additional software in support of testing is discussed including software in support of a meteorological subsystem and the Test Bed Concentrator Control Console interface. Conclusions and recommendations for further development are discussed.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vinick, Charles; Riccobono, Antonino, MS; Messing, Charles G., Ph.D.

    Dehlsen Associates, LLC was awarded a grant by the United States Department of Energy (DOE) Golden Field Office for a project titled 'Siting Study Framework and Survey Methodology for Marine and Hydrokinetic Energy Project in Offshore Southeast Florida,' corresponding to DOE Grant Award Number DE-EE0002655 resulting from DOE funding Opportunity Announcement Number DE-FOA-0000069 for Topic Area 2, and it is referred to herein as 'the project.' The purpose of the project was to enhance the certainty of the survey requirements and regulatory review processes for the purpose of reducing the time, efforts, and costs associated with initial siting efforts ofmore » marine and hydrokinetic energy conversion facilities that may be proposed in the Atlantic Ocean offshore Southeast Florida. To secure early input from agencies, protocols were developed for collecting baseline geophysical information and benthic habitat data that can be used by project developers and regulators to make decisions early in the process of determining project location (i.e., the siting process) that avoid or minimize adverse impacts to sensitive marine benthic habitat. It is presumed that such an approach will help facilitate the licensing process for hydrokinetic and other ocean renewable energy projects within the study area and will assist in clarifying the baseline environmental data requirements described in the U.S. Department of the Interior Bureau of Ocean Energy Management, Regulation and Enforcement (formerly Minerals Management Service) final regulations on offshore renewable energy (30 Code of Federal Regulations 285, published April 29, 2009). Because projects generally seek to avoid or minimize impacts to sensitive marine habitats, it was not the intent of this project to investigate areas that did not appear suitable for the siting of ocean renewable energy projects. Rather, a two-tiered approach was designed with the first step consisting of gaining overall insight about seabed conditions offshore southeastern Florida by conducting a geophysical survey of pre-selected areas with subsequent post-processing and expert data interpretation by geophysicists and experienced marine biologists knowledgeable about the general project area. The second step sought to validate the benthic habitat types interpreted from the geophysical data by conducting benthic video and photographic field surveys of selected habitat types. The goal of this step was to determine the degree of correlation between the habitat types interpreted from the geophysical data and what actually exists on the seafloor based on the benthic video survey logs. This step included spot-checking selected habitat types rather than comprehensive evaluation of the entire area covered by the geophysical survey. It is important to note that non-invasive survey methods were used as part of this study and no devices of any kind were either temporarily or permanently attached to the seabed as part of the work conducted under this project.« less

  2. 7 CFR 1948.84 - Application procedure for site development and acquisition grants.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Property,” Form FmHA or its successor agency under Public Law 103-354 440-34, (Lease on a site for a public... accordance with 7 CFR part 3550); (3) Description of project and relationship to approved growth management...) Evidence that the land is stable if the land has been previously mined (include relevant data on soil and...

  3. Eastern Anatolia Observatory (DAG): Recent developments and a prospective observing site for robotic telescopes

    NASA Astrophysics Data System (ADS)

    Yesilyaprak, C.; Yerli, S. K.; Keskin, O.

    2016-12-01

    This document (Eastern Anatolia Observatory (DAG) is the new observatory of Turkey with the optical and near-infrared largest telescope (4 m class) and its robust observing site infrastructure. This national project consists of three phases with DAG (Telescope, Enclosure, Buildings and Infrastructures), FPI (Focal Plane Instruments and Adaptive Optics) and MCP (Mirror Coating Plant) and is supported by the Ministry of Development of Turkey. The tenders of telescope and enclosure have been made and almost all the infrastructure (roads, geological and atmospherical surveys, electricity, fiber optics, cable car, water, generator, etc.) of DAG site (Erzurum/Turkey, 3,170 m altitude) have been completed. This poster is about the recent developments of DAG and about the future possible collaborations for various robotic telescopes which can be set up in DAG site.

  4. DEVELOPING A COST EFFECTIVE ENVIRONMENTAL SOLUTION FOR PRODUCED WATER AND CREATING A ''NEW'' WATER RESOURCE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glenn Doran

    1997-04-28

    This report summarizes the status of this project for the quarter January 1, 1997 to March 31, 1997. Phase II has been started and Task 7, Develop Pilot Scale Test Work Plan has been completed. The operational portion of this phase, Task 8 has been initiated with several pieces of pilot equipment already on-site. The start up of the full process train will not occur until the next quarter. The project is slightly behind schedule. A no cost extension was requested and was granted. The anticipated completion date is December 31, 1997. The project is on budget.

  5. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daniel F. Ancona III; Kathryn E. George; Richard P. Bowers

    This study, supported by the US Department of Energy, Wind Powering America Program, Maryland Department of Natural Resources and Chesapeake Bay Foundation, analyzed barriers to wind energy development in the Mid-Atlantic region along with options for overcoming or mitigating them. The Mid-Atlantic States including Delaware, Maryland, North Carolina and Virginia, have excellent wind energy potential and growing demand for electricity, but only two utility-scale projects have been installed to date. Reasons for this apathetic development of wind resources were analyzed and quantified for four markets. Specific applications are: 1) Appalachian mountain ridgeline sites, 2) on coastal plains and peninsulas, 3)more » at shallow water sites in Delaware and Chesapeake Bays, Albemarle and Pamlico Sounds, and 4) at deeper water sites off the Atlantic coast. Each market has distinctly different opportunities and barriers. The primary barriers to wind development described in this report can be grouped into four categories; state policy and regulatory issues, wind resource technical uncertainty, economic viability, and public interest in environmental issues. The properties of these typologies are not mutually independent and do interact. The report concluded that there are no insurmountable barriers to land-based wind energy projects and they could be economically viable today. Likewise potential sites in sheltered shallow waters in regional bay and sounds have been largely overlooked but could be viable currently. Offshore ocean-based applications face higher costs and technical and wind resource uncertainties. The ongoing research and development program, revision of state incentive policies, additional wind measurement efforts, transmission system expansion, environmental baseline studies and outreach to private developers and stakeholders are needed to reduce barriers to wind energy development.« less

  7. Progress of the Enhanced Hanford Single Shell Tank (SST) Integrity Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Venetz, Theodore J.; Washenfelder, Dennis J.; Boomer, Kayle D.

    2015-01-07

    To improve the understanding of the single-shell tanks (SSTs) integrity, Washington River Protection Solutions, LLC (WRPS), the USDOE Hanford Site tank contractor, developed an enhanced Single-Shell Tank Integrity Project (SSTIP) in 2009. An expert panel on SST integrity, consisting of various subject matters experts in industry and academia, was created to provide recommendations supporting the development of the project. This panel developed 33 recommendations in four main areas of interest: structural integrity, liner degradation, leak integrity and prevention, and mitigation of contamination migration. In late 2010, seventeen of these recommendations were used to develop the basis for the M-45-10-1 Changemore » Package for the Hanford Federal Agreement and Compliance Order, which is also known as the Tri-Party Agreement.« less

  8. Marshall Space Flight Center Telescience Resource Kit

    NASA Technical Reports Server (NTRS)

    Wade, Gina

    2016-01-01

    Telescience Resource Kit (TReK) is a suite of software applications that can be used to monitor and control assets in space or on the ground. The Telescience Resource Kit was originally developed for the International Space Station program. Since then it has been used to support a variety of NASA programs and projects including the WB-57 Ascent Vehicle Experiment (WAVE) project, the Fast Affordable Science and Technology Satellite (FASTSAT) project, and the Constellation Program. The Payloads Operations Center (POC), also known as the Payload Operations Integration Center (POIC), provides the capability for payload users to operate their payloads at their home sites. In this environment, TReK provides local ground support system services and an interface to utilize remote services provided by the POC. TReK provides ground system services for local and remote payload user sites including International Partner sites, Telescience Support Centers, and U.S. Investigator sites in over 40 locations worldwide. General Capabilities: Support for various data interfaces such as User Datagram Protocol, Transmission Control Protocol, and Serial interfaces. Data Services - retrieve, process, record, playback, forward, and display data (ground based data or telemetry data). Command - create, modify, send, and track commands. Command Management - Configure one TReK system to serve as a command server/filter for other TReK systems. Database - databases are used to store telemetry and command definition information. Application Programming Interface (API) - ANSI C interface compatible with commercial products such as Visual C++, Visual Basic, LabVIEW, Borland C++, etc. The TReK API provides a bridge for users to develop software to access and extend TReK services. Environments - development, test, simulations, training, and flight. Includes standalone training simulators.

  9. Energy Efficient Community Development in California: Chula Vista Research Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gas Technology Institute

    2009-03-31

    In 2007, the U.S. Department of Energy joined the California Energy Commission in funding a project to begin to examine the technical, economic and institutional (policy and regulatory) aspects of energy-efficient community development. That research project was known as the Chula Vista Research Project for the host California community that co-sponsored the initiative. The researches proved that the strategic integration of the selected and economically viable buildings energy efficiency (EE) measures, photovoltaics (PV), distributed generation (DG), and district cooling can produce significant reductions in aggregate energy consumption, peak demand and emissions, compared to the developer/builder's proposed baseline approach. However, themore » central power plant emission reductions achieved through use of the EE-DG option would increase local air emissions. The electric and natural gas utility infrastructure impacts associated with the use of the EE and EE-PV options were deemed relatively insignificant while use of the EE-DG option would result in a significant reduction of necessary electric distribution facilities to serve a large-scale development project. The results of the Chula Vista project are detailed in three separate documents: (1) Energy-Efficient Community Development in California; Chula Vista Research Project report contains a detailed description of the research effort and findings. This includes the methodologies, and tools used and the analysis of the efficiency, economic and emissions impacts of alternative energy technology and community design options for two development sites. Research topics covered included: (a) Energy supply, demand, and control technologies and related strategies for structures; (b) Application of locally available renewable energy resources including solar thermal and PV technology and on-site power generation with heat recovery; (c) Integration of local energy resources into district energy systems and existing energy utility networks; (d) Alternative land-use design and development options and their impact on energy efficiency and urban runoff, emissions and the heat island effect; and (e) Alternative transportation and mobility options and their impact on local emissions. (2) Creating Energy-Efficient Communities in California: A Reference Guide to Barriers, Solutions and Resources report provides the results of an effort to identify the most innovative existing and emerging public policy, incentive and market mechanisms that encourage investment in advanced energy technologies and enabling community design options in the State of California and the nation. The report evaluates each of these mechanisms in light of the preceding research and concludes with a set of recommended mechanisms designed for consideration by relevant California State agencies, development and finance industry associations, and municipal governments. (3) Creating Energy-Efficient Communities in California: A Technical Reference Guide to Building and Site Design report contains a set of selected commercially viable energy technology and community design options for high-efficiency, low-impact community development in California. It includes a summary of the research findings referenced above and recommendations for energy technology applications and energy-efficient development strategies for residential, commercial and institutional structures and supporting municipal infrastructure for planned communities. The document also identifies design options, technology applications and development strategies that are applicable to urban infill projects.« less

  10. Drilling Automation Tests At A Lunar/Mars Analog Site

    NASA Technical Reports Server (NTRS)

    Glass, B.; Cannon, H.; Hanagud, S.; Lee, P.; Paulsen, G.

    2006-01-01

    Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. The limited mass, energy and manpower in planetary drilling situations makes application of terrestrial drilling techniques problematic. The Drilling Automation for Mars Exploration (DAME) project is developing drilling automation and robotics for projected use in missions to the Moon and Mars in the 2011-15 period. This has been tested recently, drilling in permafrost at a lunar/martian analog site (Haughton Crater, Devon Island, Canada).

  11. Web Platform Application

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paulsworth, Ashley; Kurtz, Jim; Brun de Pontet, Stephanie

    Sunvestment Energy Group (previously called Sunvestment Group) was established to create a web application that brings together site hosts, those who will obtain the energy from the solar array, with project developers and funders, including affinity investors. Sunvestment Energy Group (SEG) uses a community-based model that engages with investors who have some affinity with the site host organization. In addition to a financial return, these investors receive non-financial value from their investments and are therefore willing to offer lower cost capital. This enables the site host to enjoy more savings from solar through these less expensive Community Power Purchase Agreementsmore » (CPPAs). The purpose of this award was to develop an online platform to bring site hosts and investors together virtually.« less

  12. Developing children’s palliative care in Africa through beacon centres: lessons learnt

    PubMed Central

    2013-01-01

    Much progress has been made in the provision of palliative care across sub-Saharan Africa, however much still remains to be done, particularly in the area of children’s palliative care (CPC). The Beacon Centres programme was set up in 2009, aimed at improving access to CPC in South Africa, Uganda and Tanzania through more and better-trained health professionals and CPC clinical services of a high standard. Having identified sites in each country to develop into CPC Beacon Centres, Navigators were identified who would be the ‘champions’ for CPC in those sites and lead a programme of training, mentorship and support. Five navigators (2 in Uganda and Tanzania and 1 in South Africa) were trained between September and December 2009. Following this they undertook CPC needs assessments at the 3 centres and set up and delivered a six-month CPC training programme, providing mentorship and support to students to enable them to integrate CPC into their workplaces. To date, 188 participants have commenced the six-month course, with 80 having completed it. CPC has been integrated into the activities of the centres and a CPC virtual resource centre set up in South Africa. The achievements from the Beacon project have been great and the work of the navigators immense, but as in all projects it has not been without its challenges. Lessons learnt include issues around: the focus of the project; the length and nature of the training; assessment; accreditation; the choice of navigators; mentoring; administrative support; co-ordination; the choice of project sites; and the integration of CPC into services. The need for CPC is not going to go away and it is therefore important that models of scaling-up are found that are not only practical, feasible, affordable and sustainable, but that focus on the outcome of improved CPC for all those who need it. It is hoped that the lessons shared from the Beacon Project will help in developing and implementing such models. PMID:23419095

  13. Development by Design: Mitigating Wind Development's Impacts on Wildlife in Kansas

    PubMed Central

    Obermeyer, Brian; Manes, Robert; Kiesecker, Joseph; Fargione, Joseph; Sochi, Kei

    2011-01-01

    Wind energy, if improperly sited, can impact wildlife through direct mortality and habitat loss and fragmentation, in contrast to its environmental benefits in the areas of greenhouse gas, air quality, and water quality. Fortunately, risks to wildlife from wind energy may be alleviated through proper siting and mitigation offsets. Here we identify areas in Kansas where wind development is incompatible with conservation, areas where wind development may proceed but with compensatory mitigation for impacts, and areas where development could proceed without the need for compensatory mitigation. We demonstrate that approximately 10.3 million ha in Kansas (48 percent of the state) has the potential to provide 478 GW of installed capacity while still meeting conservation goals. Of this total, approximately 2.7 million ha would require no compensatory mitigation and could produce up to 125 GW of installed capacity. This is 1,648 percent higher than the level of wind development needed in Kansas by 2030 if the United States is to get 20 percent of its electricity from wind. Projects that avoid and offset impacts consistent with this analysis could be awarded “Green Certification.” Certification may help to expand and sustain the wind industry by facilitating the completion of individual projects sited to avoid sensitive areas and protecting the industry's reputation as an ecologically friendly source of electricity. PMID:22046333

  14. National Institute of Neurological Disorders and Stroke Common Data Element Project - approach and methods.

    PubMed

    Grinnon, Stacie T; Miller, Kristy; Marler, John R; Lu, Yun; Stout, Alexandra; Odenkirchen, Joanne; Kunitz, Selma

    2012-06-01

    In neuroscience clinical research studies, much time and effort are devoted to deciding what data to collect and developing data collection forms and data management systems to capture the data. Many investigators receiving funding from National Institute of Neurological Disorders and Stroke (NINDS), the National Institutes of Health (NIH), are required to share their data once their studies are complete, but the multitude of data definitions and formats make it extremely difficult to aggregate data or perform meta-analyses across studies. In an effort to assist investigators and accelerate data sharing in neuroscience clinical research, the NINDS has embarked upon the Common Data Element (CDE) Project. The data standards developed through the NINDS CDE Project enable clinical investigators to systematically collect data and should facilitate study start-up and data aggregation across the research community. The NINDS CDE Team has taken a systematic, iterative approach to develop the critical core and the disease-specific CDEs. The CDE development process provides a mechanism for community involvement and buy-in, offers a structure for decision making, and includes a technical support team. Upon conclusion of the development process, the CDEs and accompanying tools are available on the Project Web site - http://www.commondataelements.ninds.nih.gov/. The Web site currently includes the critical core (aka general) CDEs that are applicable to all clinical research studies regardless of therapeutic area as well as several disease-specific CDEs. Additional disease-specific CDEs will be added to the Web site once they are developed and vetted over the next 12 months. The CDEs will continue to evolve and will improve only if clinical researchers use and offer feedback about their experience with them. Thus, the NINDS program staff strongly encourages its clinical research grantees to use the CDEs and is expanding its efforts to educate the neuroscience research community about the CDEs and to train research teams to incorporate them into their studies. Version 1.0 of a set of CDEs has been published, but publication is not the end of the development process. All CDEs will be evaluated and revised at least annually to ensure that they reflect current clinical research practices in neuroscience.

  15. Methanex considers methanol, MTBE in Qatar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    CW has learned that Methanex Corp. is considering entering one of two methanol and methyl tert-butyl ether (MTBE) projects in Qatar. Executive v.p. Michael Wilson says that part of the company`s New Zealand plant could be moved to a site in Qatar, which would lower capital costs for the possible project by $75 million-$100 million. Both Qatar General Petroleum Corp. and Qatar Fuel Additives are developing methanol and MTBE projects at Umm Said, Qatar. Methanex says its goal is to ensure low-cost feedstocks.

  16. One year of vertical wind profiles measurements at a Mediterranean coastal site of South Italy

    NASA Astrophysics Data System (ADS)

    Calidonna, Claudia Roberta; Avolio, Elenio; Federico, Stefano; Gullì, Daniel; Lo Feudo, Teresa; Sempreviva, Anna Maria

    2015-04-01

    In order to develop wind farms projects is challenging to site them on coastal areas both onshore and offshore as suitable sites. Developing projects need high quality databases under a wide range of atmospheric conditions or high resolution models that could resolve the effect of the coastal discontinuity in the surface properties. New parametrizations are important and high quality databases are also needed for formulating them. Ground-based remote sensing devices such as lidars have been shown to be functional for studying the evolution of the vertical wind structure coastal atmospheric boundary layer both on- and offshore. Here, we present results from a year of vertical wind profiles, wind speed and direction, monitoring programme at a site located in the Italian Calabria Region, Central Mediterranean, 600m from the Thyrrenian coastline, where a Lidar Doppler, ZephIr (ZephIr ltd) has been operative since July 2013. The lidar monitors wind speed and direction from 10m up to 300m at 10 vertical levels with an average of 10 minutes and it is supported by a metmast providing: Atmospheric Pressure, Solar Radiation, Precipitation, Relative Humidity, Temperature,Wind Speed and Direction at 10m. We present the characterization of wind profiles during one year period according to the time of the day to transition periods night/day/night classified relating the local scale, breeze scale, to the large scale conditions. The dataset is also functional for techniques for short-term prediction of wind for the renewable energy integration in the distribution grids. The site infrastructure is funded within the Project "Infrastructure of High Technology for Environmental and Climate Monitoring" (I-AMICA) (PONa3_00363) by the Italian National Operative Program (PON 2007-2013) and European Regional Development Fund. Real-time data are show on http://www.i-amica.it/i-amica/?page_id=1122.

  17. Optimization of a Time-Lapse Gravity Network for Carbon Sequestration

    NASA Astrophysics Data System (ADS)

    Appriou, D.; Strickland, C. E.; Ruprecht Yonkofski, C. M.

    2017-12-01

    The objective of this study is to evaluate what could be a comprehensive and optimal state of the art gravity monitoring network that would meet the UIC class VI regulation and insure that 90% of the CO2 injected remain underground. Time-lapse gravity surveys have a long history of effective applications of monitoring temporal density changes in the subsurface. For decades, gravity measurements have been used for a wide range of applications. The interest of time-lapse gravity surveys for monitoring carbon sequestration sites started recently. The success of their deployment in such sites depends upon a combination of favorable conditions, such as the reservoir geometry, depth, thickness, density change over time induced by the CO2 injection and the location of the instrument. In most cases, the density changes induced by the CO2 plume in the subsurface are not detectable from the surface but the use of borehole gravimeters can provide excellent results. In the framework of the National Assessment and Risk Partnership (NRAP) funded by the Department of Energy, the evaluation of the effectiveness of the gravity monitoring of a CO2 storage site has been assessed using multiple synthetic scenarios implemented on a community model developed for the Kimberlina site (e.g., fault leakage scenarios, borehole leakage). The Kimberlina carbon sequestration project was a pilot project located in southern San Joaquin Valley, California, aimed to safely inject 250,000 t CO2/yr for four years. Although the project was cancelled in 2012, the site characterization efforts resulted in the development of a geologic model. In this study, we present the results of the time-lapse gravity monitoring applied on different multiphase flow and reactive transport models developed by Lawrence Berkeley National Laboratory (i.e., no leakage, permeable fault zone, wellbore leakage). Our monitoring approach considers an ideal network, consisting of multiple vertical and horizontal instrumented boreholes that could be used to track the CO2 plume and potential leaks. A preliminary cost estimate will also be provided.

  18. A Framework for Assessing Feasibility of Transit-Oriented Development (TOD) Project Sites : Research Brief

    DOT National Transportation Integrated Search

    2017-09-01

    This research answers the question: How can a transit agency choose among alternative TOD locations within a transit network? The ultimate objective of the research is to develop a decision support framework which can be used by transit agencies when...

  19. Market Transformation | Hydrogen and Fuel Cells | NREL

    Science.gov Websites

    deployment sites Develop techno-economic assessment tools, deployment tools, and business cases for various fuel cell applications Collect and evaluate data from deployment projects to verify the business cases

  20. Ambler, Pennsylvania

    EPA Pesticide Factsheets

    This site provides history, current information, collaborative projects, removal/remedial work in and around the Ambler area, and will serve as a forum for audiences to learn and possibly exchange ideas on asbestos research and development in the area.

  1. From framework to action: the DESIRE approach to combat desertification.

    PubMed

    Hessel, R; Reed, M S; Geeson, N; Ritsema, C J; van Lynden, G; Karavitis, C A; Schwilch, G; Jetten, V; Burger, P; van der Werff Ten Bosch, M J; Verzandvoort, S; van den Elsen, E; Witsenburg, K

    2014-11-01

    It has become increasingly clear that desertification can only be tackled through a multi-disciplinary approach that not only involves scientists but also stakeholders. In the DESIRE project such an approach was taken. As a first step, a conceptual framework was developed in which the factors and processes that may lead to land degradation and desertification were described. Many of these factors do not work independently, but can reinforce or weaken one another, and to illustrate these relationships sustainable management and policy feedback loops were included. This conceptual framework can be applied globally, but can also be made site-specific to take into account that each study site has a unique combination of bio-physical, socio-economic and political conditions. Once the conceptual framework was defined, a methodological framework was developed in which the methodological steps taken in the DESIRE approach were listed and their logic and sequence were explained. The last step was to develop a concrete working plan to put the project into action, involving stakeholders throughout the process. This series of steps, in full or in part, offers explicit guidance for other organizations or projects that aim to reduce land degradation and desertification.

  2. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  3. Crustal Dynamics Project: Catalogue of site information

    NASA Technical Reports Server (NTRS)

    1985-01-01

    This document represents a catalogue of site information for the Crustal Dynamics Project. It contains information and descriptions of those sites used by the Project as observing stations for making the precise geodetic measurements useful for studies of the Earth's crustal movements and deformation.

  4. Handling the difficult Brownfields issues: A case study of privately funded remediation to residential standards update 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McLeod, D.P.; Ridley, A.P.

    Most Brownfields projects are based on either direct or indirect government funding. This paper describes a more unusual scenario: the remediation of a contaminated industrial site for re-use as residential property. Using the ASTM RBCA risk assessment methodology and an innovative fixed fee arrangement between Woodward-Clyde Consultants and the site owner, they developed and successfully implemented a plan to clean up the site to residential standards over a twelve (12) month time period.

  5. Image-Based Virtual Tours and 3d Modeling of Past and Current Ages for the Enhancement of Archaeological Parks: the Visualversilia 3d Project

    NASA Astrophysics Data System (ADS)

    Castagnetti, C.; Giannini, M.; Rivola, R.

    2017-05-01

    The research project VisualVersilia 3D aims at offering a new way to promote the territory and its heritage by matching the traditional reading of the document and the potential use of modern communication technologies for the cultural tourism. Recently, the research on the use of new technologies applied to cultural heritage have turned their attention mainly to technologies to reconstruct and narrate the complexity of the territory and its heritage, including 3D scanning, 3D printing and augmented reality. Some museums and archaeological sites already exploit the potential of digital tools to preserve and spread their heritage but interactive services involving tourists in an immersive and more modern experience are still rare. The innovation of the project consists in the development of a methodology for documenting current and past historical ages and integrating their 3D visualizations with rendering capable of returning an immersive virtual reality for a successful enhancement of the heritage. The project implements the methodology in the archaeological complex of Massaciuccoli, one of the best preserved roman site of the Versilia Area (Tuscany, Italy). The activities of the project briefly consist in developing: 1. the virtual tour of the site in its current configuration on the basis of spherical images then enhanced by texts, graphics and audio guides in order to enable both an immersive and remote tourist experience; 2. 3D reconstruction of the evidences and buildings in their current condition for documentation and conservation purposes on the basis of a complete metric survey carried out through laser scanning; 3. 3D virtual reconstructions through the main historical periods on the basis of historical investigation and the analysis of data acquired.

  6. Service-Learning in Communities of Elders (SLICE): Development and Evaluation of an Introductory Geriatrics Course for Medical Students.

    PubMed

    Laks, Jordana; Wilson, Lindsay A; Khandelwal, Christine; Footman, Eleni; Jamison, Margaret; Roberts, Ellen

    2016-01-01

    Medical students have limited exposure to Geriatrics in their traditional training. Service-learning offers students the opportunity to engage with older adult communities and become more comfortable interacting with this population. A preclinical elective course was developed to expand medical students' experiences in Geriatrics through service-learning. In this course, students conducted needs assessments in diverse older adult communities, created health education projects to address community-identified needs, and reflected on their experiences through written assignments and presentations. The course instructor presented lectures on special topics in Geriatrics, including ageism and health literacy. The curriculum aimed to familiarize students with older adults' needs in a variety of settings. Over 3 years, 74 students participated in the service-learning course. Students were assigned to older adult community sites, where they conducted needs assessments and designed and implemented original educational projects targeting community concerns. Program evaluation methods included a validated survey assessing students' attitudes toward older adults, course evaluations, review of student assignments and projects, and feedback from older adult participants and site coordinators. Students gained hands-on experience working with older adults and designing appropriate health education projects. Analysis of attitude surveys demonstrated students' increased interest in Geriatrics as a career. Both students and older adult participants described enjoyable, valuable experiences gained from service-learning activities. Students appreciated the combination of community and classroom learning about Geriatrics. Service-learning was most constructive at sites with responsive coordinators, engaged older adults, and a need for health education resources. The course challenged students to assess health needs in communities that included cognitively impaired elders and to design educational projects tailored to older adults.

  7. Policy at play: The implementation of Healthy Eating and Active Living Guidelines in municipal child care settings.

    PubMed

    McKay, Kelly; Nigro, Sherry

    2017-03-01

    In 2012, Ottawa Public Health (OPH) partnered with the City of Ottawa Municipal Child Care (MCC) Services to develop Healthy Eating and Active Living (HEAL) Guidelines. The Guidelines aim to promote consistent standards of practice in child care settings related to healthy environments and food, physical activity, physical literacy, decreased sedentary behaviours, and positive role modeling by staff. The Guidelines targeted 498 children aged 18 months to 5 years, attending MCC centres. Resources and training were provided to 10 supervisors, 63 child care educators and 9 cooks. Components of the Guidelines were piloted in 5 MCC sites prior to being launched in 10 MCC sites across Ottawa, Ontario. Two project Advisory Groups supported the development of the Guidelines. Staff training, resources, recipes and menus were provided. An evaluation was conducted and has informed the Guidelines' subsequent community implementation. In 2015, accompanying web-based resources and e-modules were developed. The evaluation demonstrated environmental and programming changes. Parent satisfaction was high and preliminary findings showed no real changes in food costs. Following implementation, the cooks reported high compliance to the 6-week menu plans provided, and the number of sites offering 120 minutes or more of daily physical activity increased. Through novel intersectoral partnerships, OPH was able to implement and evaluate HEAL Guidelines in tandem. The interdisciplinary project Advisory Groups, training of cooks, and engagement of the Ontario Coaches Association were all innovative elements of this project and may influence future public health activity in this area.

  8. Development and Demonstration of an Aerial Imagery Assessment Method to Monitor Changes in Restored Stream Condition

    NASA Astrophysics Data System (ADS)

    Fong, L. S.; Ambrose, R. F.

    2017-12-01

    Remote sensing is an excellent way to assess the changing condition of streams and wetlands. Several studies have measured large-scale changes in riparian condition indicators, but few have remotely applied multi-metric assessments on a finer scale to measure changes, such as those caused by restoration, in the condition of small riparian areas. We developed an aerial imagery assessment method (AIAM) that combines landscape, hydrology, and vegetation observations into one index describing overall ecological condition of non-confined streams. Verification of AIAM demonstrated that sites in good condition (as assessed on-site by the California Rapid Assessment Method) received high AIAM scores. (AIAM was not verified with poor condition sites.) Spearman rank correlation tests comparing AIAM and the field-based California Rapid Assessment Method (CRAM) results revealed that some components of the two methods were highly correlated. The application of AIAM is illustrated with time-series restoration trajectories of three southern California stream restoration projects aged 15 to 21 years. The trajectories indicate that the projects improved in condition in years following their restoration, with vegetation showing the most dynamic change over time. AIAM restoration trajectories also overlapped to different degrees with CRAM chronosequence restoration performance curves that demonstrate the hypothetical development of high-performing projects. AIAM has high potential as a remote ecological assessment method and effective tool to determine restoration trajectories. Ultimately, this tool could be used to further improve stream and wetland restoration management.

  9. SELECTION AND TREATMENT OF STRIPPER GAS WELLS FOR PRODUCTION ENHANCEMENT IN THE MID-CONTINENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott Reeves

    2003-03-01

    Stripper gas wells are an important source of domestic energy supply and under constant threat of permanent loss (shut-in) due to marginal economics. In 1998, 192 thousand stripper gas wells produced over a Tcf of gas, at an average rate of less than 16 Mcfd. This represents about 57% of all producing gas wells in the onshore lower-48 states, yet only 8% of production. Reserves of stripper gas wells are estimated to be only 1.6 Tcf, or slightly over 1% of the onshore lower-48 total (end of year 1996 data). Obviously, stripper gas wells are at the very margin ofmore » economic sustenance. As the demand for natural gas in the U.S. grows to the forecasted estimate of over 30 Tcf annually by the year 2010, supply from current conventional sources is expected to decline. Therefore, an important need exists to fully exploit known domestic resources of natural gas, including those represented by stripper gas wells. The overall objectives of this project are to develop an efficient and low-cost methodology to broadly categorize the well performance characteristics for a stripper gas field, identify the high-potential candidate wells for remediation, and diagnose the specific causes for well underperformance. With this capability, stripper gas well operators can more efficiently and economically produce these resources and maximize these gas reserves. A further objective is to identify/develop, evaluate and test ''new and novel,'' economically viable remediation options. Finally, it is the objective of this project that all the methods and technologies developed in this project, while being tested in the Mid-Continent, be widely applicable to stripper gas wells of all types across the country. The project activities during the reporting period were: (1) Continued to solicit industry research partners to provide test sites. A Cooperative Research Agreement has been signed with Oneok, for a test site in the Mocane-Laverne field in the Anadarko basin (Oklahoma). The site consists of about 150 wells producing primarily from the Morrow, but also the Chester, Hoover, and Tonkawa. The Morrow is the second largest gas play in the Anadarko basin (next to Hugoton), and the Mocane-Laverne field in the largest Morrow field, so any new methods developed at this site will have broad application throughout the Mid-Continent Morrow play (which has tens of thousands of wells). (2) Discussions are also ongoing with EOG Resources and Patina Oil and Gas to obtain test sites. In these cases, however, the sites are in the Rocky Mountains. The difficulty being encountered in securing Mid-Continent test sites has forced us to expand the geographic scope of our search. (3) Data collection for the Mocane-Laverne site has recently begun, and will be completed soon. At that time the various analyses will be performed to identify enhancement potential.« less

  10. Analytic hierarchy process helps select site for limestone quarry expansion in Barbados.

    PubMed

    Dey, Prasanta Kumar; Ramcharan, Eugene K

    2008-09-01

    Site selection is a key activity for quarry expansion to support cement production, and is governed by factors such as resource availability, logistics, costs, and socio-economic-environmental factors. Adequate consideration of all the factors facilitates both industrial productivity and sustainable economic growth. This study illustrates the site selection process that was undertaken for the expansion of limestone quarry operations to support cement production in Barbados. First, alternate sites with adequate resources to support a 25-year development horizon were identified. Second, technical and socio-economic-environmental factors were then identified. Third, a database was developed for each site with respect to each factor. Fourth, a hierarchical model in analytic hierarchy process (AHP) framework was then developed. Fifth, the relative ranking of the alternate sites was then derived through pair wise comparison in all the levels and through subsequent synthesizing of the results across the hierarchy through computer software (Expert Choice). The study reveals that an integrated framework using the AHP can help select a site for the quarry expansion project in Barbados.

  11. Building and critiquing qualitative research websites: a cyberspace project to connect undergraduate nursing students in Canada and the United States.

    PubMed

    Teel, Cynthia S; Shaw, Judith A

    2005-01-01

    This project had a dual purpose: 1) to facilitate student learning about qualitative research methods, and 2) to promote collegiality and professional development among senior nursing students in Canada and the United States through the use of distance technology. In each of three project years, students at St. Francis Xavier University (STFX) in Nova Scotia initiated the experience by working in small groups to develop websites about different methodological approaches in qualitative research. Site information included an overview of the selected approach, discussion of trustworthiness issues, citation of journal articles in which authors used the approach, additional references, and some personal information about the student developers. Also working in small groups, University of Kansas students identified and read related research articles, reviewed website information, and responded to the STFX groups about the usefulness of site information in increasing understanding of qualitative methods and using the information for evaluation of research. The experience promoted active use of qualitative research concepts and facilitated the development of skills in evaluating research article content and website content. Participation in the activity fostered positive perceptions about the value and use of research and helped students appreciate the similarities in courses, programs, and professional requirements and values among international peers.

  12. Case Studies in Application of System Engineering Practices to Capstone Projects

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wissemann, Chris; White, Stanley M

    The primary objective of the project was to develop a innovative Gravity Base Foundation (GBF) concepts, including fabrication yards, launching systems and installation equipment, for a 500MW utility scale project in the Great Lakes (Lake Erie). The goal was to lower the LCOE by 25%. The project was the first to investigate an offshore wind project in the Great Lakes and it has furthered the body of knowledge for foundations and installation methods within Lake Erie. The project collected historical geotechnical information for Lake Erie and also used recently obtained data from the LEEDCo Icebreaker Project (FOA DE-EE0005989) geotechnical programmore » to develop the conceptual designs. Using these data-sets, the project developed design wind and wave conditions from actual buoy data in order to develop a concept that would de-risk a project using a GBF. These wind and wave conditions were then utilized to create reference designs for various foundations specific to installation in Lake Erie. A project partner on the project (Weeks Marine) provided input for construction and costing the GBF fabrication and installation. By having a marine contractor with experience with large marine projects as part of the team provides credibility to the LCOE developed by NREL. NREL then utilized the design and construction costing information as part of the LCOE model. The report summarizes the findings of the project; Developed a cost model and “baseline” LCOE; Documented Site Conditions within Lake Erie; Developed Fabrication, Installation and Foundations Innovative Concept Designs; Evaluated LCOE Impact of Innovations; Developed Assembly line “Rail System” for GBF Construction and Staging; Developed Transit-Inspired Foundation Designs which incorporated: Semi-Floating Transit with Supplemental Pontoons Barge mounted Winch System; Developed GBF with “Penetration Skirt”; Developed Integrated GBF with Turbine Tower; Developed Turbine, Plant Layout and O&M Strategies. The report details lowering LCOE by 22.3% and identified additional strategies that could further lower LCOE when building an utility scale wind farm in the Great Lakes.« less

  14. Renewable Energy Opportunities at the Kanto Installations, Japan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.

    2010-09-24

    This document provides an overview of renewable resource development potential at the U.S. Army installations in the Kanto region in Japan, which includes Camp Zama, Yokohama North Dock, Sagamihara Family Housing Area (SFHA), Sagami General Depot, and Akasaka Press Center. This effort focuses on grid-connected generation of electricity from renewable energy sources and also on ground source heat pumps for heating and cooling buildings. The effort was funded by the Huntsville Army Corps of Engineers, and includes the development of a methodology for renewable resource assessment at Army installations located on foreign soil. The methodology is documented in Renewable Energymore » Assessment Methodology for Japanese OCONUS Army Installations. The site visit to the Kanto installations took place on April 5 and 6, 2010. At the current time, there are some renewable technologies that show economic potential. Because of siting restrictions and the small size of these installations, development of most renewable energy technologies will likely be limited to Camp Zama. Project feasibility is based on installation-specific resource availability and energy costs and projections based on accepted life-cycle cost methods. Development of any renewable energy project will be challenging, as it will require investigation into existing contractual obligations, new contracts that could be developed, the legality of certain partnerships, and available financing avenues, which involves the U.S. Forces Japan (USFJ), the Government of Japan (GOJ), and a number of other parties on both sides. The Army will not be able to implement a project without involvement and approval from the other services and multiple levels of Japanese government. However, implementation of renewable energy projects could be an attractive method for GOJ to reduce greenhouse gas emissions and lower annual utility payments to USFJ. This report recommends projects to pursue and offers approaches to use. The most promising opportunities include waste-to-energy and ground source heat pumps. Solar photovoltaics (PV) may also prove successful. Other resources were found to be insufficient on the Kanto installations.« less

  15. Development of the NASA Digital Astronaut Project Muscle Model

    NASA Technical Reports Server (NTRS)

    Lewandowski, Beth E.; Pennline, James A.; Thompson, W. K.; Humphreys, B. T.; Ryder, J. W.; Ploutz-Snyder, L. L.; Mulugeta, L.

    2015-01-01

    This abstract describes development work performed on the NASA Digital Astronaut Project Muscle Model. Muscle atrophy is a known physiological response to exposure to a low gravity environment. The DAP muscle model computationally predicts the change in muscle structure and function vs. time in a reduced gravity environment. The spaceflight muscle model can then be used in biomechanical models of exercise countermeasures and spaceflight tasks to: 1) develop site specific bone loading input to the DAP bone adaptation model over the course of a mission; 2) predict astronaut performance of spaceflight tasks; 3) inform effectiveness of new exercise countermeasures concepts.

  16. Crustal Dynamics Project: Catalogue of site information

    NASA Technical Reports Server (NTRS)

    Noll, Carey E. (Editor)

    1988-01-01

    This document represents a catalog of site information for the Crustal Dynamics Project. It contains information on and descriptions of those sites used by the Project as observing stations for making the precise geodetic measurements necessary for studies of the Earth's crustal movements and deformation.

  17. Foraminiferal, lithic, and isotopic changes across four major unconformities at Deep Sea Drilling Project Site 548, Goban Spur: Chapter 14 in Initial reports of the Deep Sea Drilling Project

    USGS Publications Warehouse

    Poag, C. Wylie; Reynolds, Leslie A.; Mazzullo, James M.; Keigwin, Loyd D.

    1985-01-01

    Sediment samples taken at close intervals across four major unconformities (middle Miocene/upper Miocene, lower Oligocene/upper Oligocene, lower Eocene/upper Eocene, lower Paleocene/upper Paleocene) at DSDP-IPOD Site 548, Goban Spur, reveal that coeval biostratigraphic gaps, sediment discontinuities, and seismic unconformities coincide with postulated low stands of sea level. Foraminiferal, lithic, and isotopic analyses demonstrate that environments began to shift prior to periods of marine erosion, and that sedimentation resumed in the form of turbidites derived from nearby upper-slope sources. The unconformities appear to have developed where a water-mass boundary intersected the continental slope, rhythmically crossing the drill site in concert with sea-level rise and fall.

  18. Social Acceptance of Wind Energy: Managing and Evaluating Its Market Impacts (Presentation)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baring-Gould, I.

    2012-06-01

    As with any industrial-scale technology, wind power has impacts. As wind technology deployment becomes more widespread, a defined opposition will form as a result of fear of change and competing energy technologies. As the easy-to-deploy sites are developed, the costs of developing at sites with deployment barriers will increase, therefore increasing the total cost of power. This presentation provides an overview of wind development stakeholders and related stakeholder engagement questions, Energy Department activities that provide wind project deployment information, and the quantification of deployment barriers and costs in the continental United States.

  19. Climate change and landscape development in post-closure safety assessment of solid radioactive waste disposal: Results of an initiative of the IAEA.

    PubMed

    Lindborg, T; Thorne, M; Andersson, E; Becker, J; Brandefelt, J; Cabianca, T; Gunia, M; Ikonen, A T K; Johansson, E; Kangasniemi, V; Kautsky, U; Kirchner, G; Klos, R; Kowe, R; Kontula, A; Kupiainen, P; Lahdenperä, A-M; Lord, N S; Lunt, D J; Näslund, J-O; Nordén, M; Norris, S; Pérez-Sánchez, D; Proverbio, A; Riekki, K; Rübel, A; Sweeck, L; Walke, R; Xu, S; Smith, G; Pröhl, G

    2018-03-01

    The International Atomic Energy Agency has coordinated an international project addressing climate change and landscape development in post-closure safety assessments of solid radioactive waste disposal. The work has been supported by results of parallel on-going research that has been published in a variety of reports and peer reviewed journal articles. The project is due to be described in detail in a forthcoming IAEA report. Noting the multi-disciplinary nature of post-closure safety assessments, here, an overview of the work is given to provide researchers in the broader fields of radioecology and radiological safety assessment with a review of the work that has been undertaken. It is hoped that such dissemination will support and promote integrated understanding and coherent treatment of climate change and landscape development within an overall assessment process. The key activities undertaken in the project were: identification of the key processes that drive environmental change (mainly those associated with climate and climate change), and description of how a relevant future may develop on a global scale; development of a methodology for characterising environmental change that is valid on a global scale, showing how modelled global changes in climate can be downscaled to provide information that may be needed for characterising environmental change in site-specific assessments, and illustrating different aspects of the methodology in a number of case studies that show the evolution of site characteristics and the implications for the dose assessment models. Overall, the study has shown that quantitative climate and landscape modelling has now developed to the stage that it can be used to define an envelope of climate and landscape change scenarios at specific sites and under specific greenhouse-gas emissions assumptions that is suitable for use in quantitative post-closure performance assessments. These scenarios are not predictions of the future, but are projections based on a well-established understanding of the important processes involved and their impacts on different types of landscape. Such projections support the understanding of, and selection of, plausible ranges of scenarios for use in post-closure safety assessments. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  20. Umatilla River Basin Anadromous Fsh Habitat Enhancement Project : 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shaw, R. Todd

    2001-12-31

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2000 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla River Basin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Habitat enhancement projects continued to be maintained on 44 private properties, four riparian easements and one in-stream enhancement agreement were secured, two new projects implemented and two existing projects improved to enhance anadromous fish habitat and natural fisheries production capabilitiesmore » in the Umatilla River Basin. New project locations included sites on the mid Umatilla River and Buckaroo Creek. Improvements were implemented at existing project sites on the upper Umatilla River and Wildhorse Creek. A stream bank stabilization project was implemented at approximately River Mile 37.4 Umatilla River to stabilize 760 feet of eroding stream bank and improve in-stream habitat diversity. Habitat enhancements at this site included construction of six rock barbs with one large conifer root wad incorporated into each barb, stinging approximately 10,000 native willow cuttings, planting 195 tubling willows and 1,800 basin wildrye grass plugs, and seeding 40 pounds of native grass seed. Staff time to assist in development of a subcontract and fence materials were provided to establish eight spring sites for off-stream watering and to protect wetlands within the Buckaroo Creek Watershed. A gravel bar was moved and incorporated into an adjacent point bar to reduce stream energy and stream channel confinement within the existing project area at River Mile 85 Umatilla River. Approximately 10,000 native willow cuttings were stung and trenched into the stream channel margins and stream banks, and 360 basin wildrye grass plugs planted and 190 pounds of native grass seed broadcast on terraces between River Mile 10 and 12.5 within the existing Wildhorse Creek Project Area. Approximately 70 pounds of native grasses were seeded in the existing McKay Creek Project Area at approximately River Mile 21.5. Financial and in-kind cost share assistance was provided by the Confederated Tribes of the Umatilla Indian Reservation, U.S. Bureau of Indian Affairs, U.S. Department of Agriculture, U.S. Fish and Wildlife Service, National Fish and Wildlife Federation and the Umatilla National Forest for the enhancements at River Mile 37.4 Umatilla River and within the Buckaroo Creek Watershed. Monitoring continued to quantify effects of habitat enhancements in the upper basin. Maximum, minimum and average daily stream temperatures were collected from June through September at 22 sites. Suspended sediment samples were obtained at three gage stations to arrive at daily sediment load estimates. Photographs were taken at 94 existing and two newly established photo points to document habitat recovery. Umatilla Basin Watershed Assessment efforts were continued under a subcontract with Washington State University. This endeavor involves compiling existing information, identifying data gaps, determining habitat-limiting factors and recommending actions to improve anadromous fisheries habitat. This watershed assessment document and working databases will be completed in fiscal year 2002 and made available to assist project personnel with sub-watershed prioritization of habitat needs.« less

  1. Science in bullet points: How to compile scientific results to underpin guidelines for CO2 storage for the German transposition of the European CCS Directive

    NASA Astrophysics Data System (ADS)

    Streibel, Martin

    2015-04-01

    In 2012 the German Parliament passed the transposition of the EC Directive 2009/31/EC the "Carbon Dioxide Storage Law" (KSpG). The law focuses on the demonstration of the CO2 storage technology and mainly regulates the storage part of the Carbon Capture and Storage (CCS) chain. As the law has a conceptual character, appendix 1 provides a description of criteria for the characterisation and assessment of a potential CO2 storage site starting with field data ending with requirements for dynamic modelling of the storage complex. Appendix 2 describes the expected monitoring system during all relevant phases of a life cycle of a CO2 storage site. The criteria given in the appendices are of general nature, which reflects on one hand that the CO2 storage technology is still being developed and on the other hand that site specific aspects needs to be considered. In 2004 the Federal Ministry of Education and Research of Germany launched the programme GEOTECHNOLOGIEN with one key aspect being the development of technologies for a sustainable storage of carbon dioxide in geological formations. Within this research field more than 30 projects in three phases have been funded until the end of 2014. In order to benefit from the gathered knowledge and use the experiences for the policy/law making process the umbrella project AUGE has been launched in October 2012 with a life time of three years. The aim of the project is to review and compile all results of projects funded during the three phases to underpin the appendices of the KSpG. In the first part of the paper the most important findings of the project with regard to the overall risk of a geological CO2 storage and the procedure of compiling the guidance document will be discussed. Milestones of this project were • the compilation of the results of national, European and international projects; • interviews with stakeholders; • a workshops to define state of the art for certain involved technologies and existing gaps; • a workshop to understand the limitations of existing simulation tools for large scale CO2 storage. In a second part of the paper it is discussed what kind of guidance documents are actually still required for regulation of large scale CO2 storage sites.

  2. The Role of Coaching by Teaching Artists for Arts-Infused Social Studies: What Project CREATES Has to Offer

    ERIC Educational Resources Information Center

    Wilcox, Ruth A.; Bridges, Stacey L.; Montgomery, Diane

    2010-01-01

    One strategy used by Project CREATES to enhance the fusion of social studies with the arts was to provide various forms of professional development to artists and teachers (Montgomery, Otto, & Hull, 2007), including seminars, book clubs, and on-site Arts Resource Coaches. The purpose of this study was to describe the role of the coaches as…

  3. Arterial catheter complications and management problems: observations from AACN's Thunder Project.

    PubMed

    1993-09-01

    Arterial cannulation, while common in critical care, is a procedure with attendant risks of complications. Anecdotal data from the American Association of Critical Care Nurses' Thunder Project provided evidence that catheters, insertion sites, and monitoring systems continue to be sources of complications. The problems have not changed since arterial cannulation began. Line management issues cannot be resolved until low-maintenance systems are developed.

  4. 7 CFR 3565.303 - Issuance of loan guarantee.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... development in 7 CFR part 1924, subpart C, or its successor regulations; (2) Cash flow certification—the lender certifies, in writing, the project's cash flow assumptions are still valid and depict compliance... standards for site development in 7 CFR part 1924, subpart C, or its successor regulations; (2) Cash flow...

  5. 7 CFR 3565.303 - Issuance of loan guarantee.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... development in 7 CFR part 1924, subpart C, or its successor regulations; (2) Cash flow certification—the lender certifies, in writing, the project's cash flow assumptions are still valid and depict compliance... standards for site development in 7 CFR part 1924, subpart C, or its successor regulations; (2) Cash flow...

  6. 7 CFR 3565.303 - Issuance of loan guarantee.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... development in 7 CFR part 1924, subpart C, or its successor regulations; (2) Cash flow certification—the lender certifies, in writing, the project's cash flow assumptions are still valid and depict compliance... standards for site development in 7 CFR part 1924, subpart C, or its successor regulations; (2) Cash flow...

  7. Colorado geothermal commercialization program: community development of geothermal energy in Pagosa Springs, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coe, B.A.

    1980-01-01

    A district heating system for the Pagosa Springs central business district is in the planning stage. A detailed analysis of the project is presented. It comprises area and site specific studies and describes in detail the recent, current, anticipated, and postulated geothermal development activities. (MHR)

  8. 75 FR 9638 - Surface Transportation Project Delivery Pilot Program; Caltrans Audit Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... practice on a case- by-case basis. The FHWA recommends that Caltrans develop a departmentwide, holistic corrective action management approach and system that will develop and implement an internal process review... the Pilot Program. During the on-site audit, Caltrans staff and management continued to express...

  9. Emergency Response: Elearning for Paramedics and Firefighters

    ERIC Educational Resources Information Center

    Taber, Nancy

    2008-01-01

    This article is based on an innovative research project with academics, software developers, and organizational pilot sites to design and develop elearning software for an emergency response simulation with supporting collaborative tools. In particular, this article focuses on the research that the author has conducted to provide the theoretical…

  10. Solar parabolic dish technology evaluation report

    NASA Technical Reports Server (NTRS)

    Lucas, J. W.

    1984-01-01

    The activities of the JPL Solar Thermal Power Systems Parabolic Dish Project for FY 1983 are summarized. Included are discussions on designs of module development including concentrator, receiver, and power conversion subsystems together with a separate discussion of field tests, Small Community Experiment system development, and tests at the Parabolic Dish Test Site.

  11. Toolbox for Research, or how to facilitate a central data management in small-scale research projects.

    PubMed

    Bialke, Martin; Rau, Henriette; Thamm, Oliver C; Schuldt, Ronny; Penndorf, Peter; Blumentritt, Arne; Gött, Robert; Piegsa, Jens; Bahls, Thomas; Hoffmann, Wolfgang

    2018-01-25

    In most research projects budget, staff and IT infrastructures are limiting resources. Especially for small-scale registries and cohort studies professional IT support and commercial electronic data capture systems are too expensive. Consequently, these projects use simple local approaches (e.g. Excel) for data capture instead of a central data management including web-based data capture and proper research databases. This leads to manual processes to merge, analyze and, if possible, pseudonymize research data of different study sites. To support multi-site data capture, storage and analyses in small-scall research projects, corresponding requirements were analyzed within the MOSAIC project. Based on the identified requirements, the Toolbox for Research was developed as a flexible software solution for various research scenarios. Additionally, the Toolbox facilitates data integration of research data as well as metadata by performing necessary procedures automatically. Also, Toolbox modules allow the integration of device data. Moreover, separation of personally identifiable information and medical data by using only pseudonyms for storing medical data ensures the compliance to data protection regulations. This pseudonymized data can then be exported in SPSS format in order to enable scientists to prepare reports and analyses. The Toolbox for Research was successfully piloted in the German Burn Registry in 2016 facilitating the documentation of 4350 burn cases at 54 study sites. The Toolbox for Research can be downloaded free of charge from the project website and automatically installed due to the use of Docker technology.

  12. Scanning Radar Investigations to Characterize Cloud and Precipitation Processes for ASR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Venkatachalam, Chandrasekar

    2016-12-17

    The project conducted investigations in the following areas related to scanning radar retrievals: a) Development for Cloud drizzle separation studies for the ENA site based on Doppler Spectra b) Advanced radar retrieval for the SGP site c) Characterizing falling snow using multifrequency dual-polarization measurements d) BAECC field experiment. More details about these investigations can be found within each subtopic within the report.

  13. Use Trends Indicated by Statistically Calibrated Recreational Sites in the National Forest System

    Treesearch

    Gary L. Tyre

    1971-01-01

    Trends in statistically sampled use of developed sites in the National Forest system indicate an average annual increase of 6.0 percent in the period 1966-69. The high variability of the measure precludes its use for projecting expected future use, but it can be important in gauging the credibility of annual use changes at both sampled and unsampled locations.

  14. Telescience Resource Kit Software Lifecycle

    NASA Technical Reports Server (NTRS)

    Griner, Carolyn S.; Schneider, Michelle

    1998-01-01

    The challenge of a global operations capability led to the Telescience Resource Kit (TReK) project, an in-house software development project of the Mission Operations Laboratory (MOL) at NASA's Marshall Space Flight Center (MSFC). The TReK system is being developed as an inexpensive comprehensive personal computer- (PC-) based ground support system that can be used by payload users from their home sites to interact with their payloads on board the International Space Station (ISS). The TReK project is currently using a combination of the spiral lifecycle model and the incremental lifecycle model. As with any software development project, there are four activities that can be very time consuming: Software design and development, project documentation, testing, and umbrella activities, such as quality assurance and configuration management. In order to produce a quality product, it is critical that each of these activities receive the appropriate amount of attention. For TReK, the challenge was to lay out a lifecycle and project plan that provides full support for these activities, is flexible, provides a way to deal with changing risks, can accommodate unknowns, and can respond to changes in the environment quickly. This paper will provide an overview of the TReK lifecycle, a description of the project's environment, and a general overview of project activities.

  15. History and progress of the North American Soil Geochemical Landscapes Project, 2001-2010

    USGS Publications Warehouse

    Smith, David B.; Cannon, William F.; Woodruff, Laurel G.; Rivera, Francisco Moreira; Rencz, Andrew N.; Garrett, Robert G.

    2012-01-01

    In 2007, the U.S. Geological Survey, the Geological Survey of Canada, and the Mexican Geological Survey initiated a low-density (1 site per 1600 km2, 13323 sites) geochemical and mineralogical survey of North American soils (North American Soil Geochemical Landscapes Project). Sampling and analytical protocols were developed at a series of workshops in 20032004 and pilot studies were conducted from 20042007. The ideal sampling protocol at each site includes a sample from 05 cm depth, a composite of the soil A horizon, and a sample from the soil C horizon. The 3, HClO4, and HF. Separate methods are used for As, Hg, Se, and total C on this same size fraction. The major mineralogical components are determined by a quantitative X-ray diffraction method. Sampling in the conterminous U.S. was completed in 2010 (c. 4800 sites) with chemical and mineralogical analysis currently underway. In Mexico, approximately 66% of the sampling (871 sites) had been done by the end of 2010 with completion expected in 2012. After completing sampling in the Maritime provinces and portions of other provinces (472 sites, 7.6% of the total), Canada withdrew from the project in 2010. Preliminary results for a swath from the central U.S. to Florida clearly show the effects of soil parent material and climate on the chemical and mineralogical composition of soils. A sample archive will be established and made available for future investigations.

  16. Intermediate Outcomes, Strategies, and Challenges of Eight Healthy Start Projects

    PubMed Central

    Walker, Deborah Klein; Hargreaves, Margaret; Rosenbach, Margo

    2008-01-01

    Site visits were conducted for the evaluation of the national Healthy Start program to gain an understanding of how projects design and implement five service components (outreach, case management, health education, depression screening and interconceptional care) and four system components (consortium, coordination/collaboration, local health system action plan and sustainability) as well as program staff’s perceptions of these components’ influence on intermediate outcomes. Interviews with project directors, case managers, local evaluators, clinicians, consortium members, outreach/lay workers and other stakeholders were conducted during 3-day in-depth site visits with eight Healthy Start grantees. Grantees reported that both services and systems components were related to self-reported service achievements (e.g. earlier entry into prenatal care) and systems achievements (e.g. consumer involvement). Outreach, case management, and health education were perceived as the service components that contributed most to their achievements while consortia was perceived as the most influential systems component in reaching their goals. Furthermore, cultural competence and community voice were overarching project components that addressed racial/ethnic disparities. Finally, there was great variability across sites regarding the challenges they faced, with poor service availability and limited funding the two most frequently reported. Service provision and systems development are both critical for successful Healthy Start projects to achieve intermediate program outcomes. Unique contextual and community issues influence Healthy Start project design, implementation and reported accomplishments. All eight projects implement the required program components yet outreach, case management, and health education are cited most frequently for contributing to their perceived achievements. PMID:19011959

  17. Brazilian Eratosthenes Project

    NASA Astrophysics Data System (ADS)

    Langhi, R.; Vilaça, J.

    2014-10-01

    The objective of Brazilian Eratosthenes Project is the development and application of teaching training actions according the ``docent autonomy" concept to basic Astronomy Education. Argentina coordinates the project in South America, but Brazil works in this project since 2010 with the theme ``Projeto Eratóstenes Brasil" in the homepage: http://sites.google.com/site/projetoerato. Two schools measure a sticks shadow and communicate their results. After, they calculate an average radius of Earth. The stick (gnomon) should stay in vertical position in the leveled ground. Since 2010, the project received hundreds of Brazilian schools with different experiments that were constructed with autonomy, because our site doesn't show some itinerary pre-ready to elaborate the experiments. To collect data for our research, we will use interviews via Skype with the teachers. These data are useful to researches about Science Education area and the Teaching Formation. Teaching professional practice could change and we see modifications in the teachers work, what depends of their realities and context. This project intents to respect the docent autonomy. This autonomy to responsible modifications during continued formation is called ``activist formative model" according Langhi & Nardi (Educação em Astronomia: repensando a formação de professores. São Paulo: Escrituras Editora, 2012). This project discusses about researches in Astronomy Education - still extreme rare in Brazil, when we compare with other areas in Science Education. We believe that actions like this could motivate the students to learn more Astronomy. Furthermore, this national action can be a rich source of data to investigations about teaching formation and scientific divulgation.

  18. Characterization and remediation of 91B radioactive waste sites under performance based contracts at Lackland Air Force Base, San Antonio, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trujillo, P.A.; Anderson, K.D.

    2007-07-01

    This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less

  19. Initial Results from the Micro-pulse Lidar Network (MPL-Net)

    NASA Technical Reports Server (NTRS)

    Welton, Ellsworth J.; Campbell, James R.; Berkoff, Timothy A.; Spinhirne, James D.; Ginoux, Paul; Starr, David OC. (Technical Monitor)

    2001-01-01

    The micro-pulse lidar system (MPL) was developed in the early 1990s and was the first small, eye-safe, and autonomous lidar built for full time monitoring of cloud and aerosol vertical distributions. In 2000, a new project using MPL systems was started at NASA Goddard Space Flight Center. This new project, the Micro-pulse Lidar Network or MPL-Net, was created to provide long-term observations of aerosol and cloud vertical profiles at key sites around the world. This is accomplished using both NASA operated sites and partnerships with other organizations owning MPL systems. The MPL-Net sites are co-located with NASA AERONET sunphotometers to provide aerosol optical depth data needed for calibration of the MPL. In addition to the long-term sites, MPL-Net provides lidar support for a limited number of field experiments and ocean cruises each year. We will present an overview of the MPL-Net project and show initial results from the first two MPL-Net sites at the South Pole and at Goddard Space Flight Center. Observations of dust layers transported from the Gobi desert, across the Pacific Ocean, to the east coast of the United States will also be shown. MPL-Net affiliated instruments were in place at the desert source region in China, on a research vessel in the Sea of Japan, at ARM sites in Alaska and Oklahoma, and finally at our home site in Maryland (GSFC) during the massive dust storms that occurred in April 2001. The MPL observations of dust layers at each location are shown in comparison to dust layers predicted using the Georgia Tech/Goddard Global Ozone Chemistry Aerosol Radiation and Transport model (GOCART). Finally, the MPL-Net project is the primary ground-validation program for the Geo-Science Laser Altimeter System (GLAS) satellite lidar project (launch date 2002). We will present an overview demonstrating how MPL-Net results are used to help prepare the GLAS data processing algorithms and assist in the calibration/validation of the GLAS data products.

  20. Initial Results From The Micro-pulse Lidar Network (MPL-Net)

    NASA Astrophysics Data System (ADS)

    Welton, E. J.; Campbell, J. R.; Berkoff, T. A.; Spinhirne, J. D.; Ginoux, P.

    2001-12-01

    The micro-pulse lidar system (MPL) was developed in the early 1990s and was the first small, eye-safe, and autonomous lidar built for fulltime monitoring of cloud and aerosol vertical distributions. In 2000, a new project using MPL systems was started at NASA Goddard Space Flight Center. This new project, the Micro-pulse Lidar Network or MPL-Net, was created to provide long-term observations of aerosol and cloud vertical profiles at key sites around the world. This is accomplished using both NASA operated sites and partnerships with other organizations owning MPL systems. The MPL-Net sites are co-located with NASA AERONET sunphotometers to provide aerosol optical depth data needed for calibration of the MPL. In addition to the long-term sites, MPL-Net provides lidar support for a limited number of field experiments and ocean cruises each year. We will present an overview of the MPL-Net project and show initial results from the first two MPL-Net sites at the South Pole and at Goddard Space Flight Center. Observations of dust layers transported from the desert regions of China, across the Pacific Ocean, to the east coast of the United States will also be shown. MPL-Net affiliated instruments were in place at the desert source region in China, on a research vessel in the Sea of Japan, at ARM sites in Alaska and Oklahoma, and finally at our home site in Maryland (GSFC) during the massive dust storms that occurred in April 2001. The MPL observations of dust layers at each location are shown in comparison to dust layers predicted using the Georgia Tech/Goddard Global Ozone Chemistry Aerosol Radiation and Transport model (GOCART). Finally, the MPL-Net project is the primary ground-validation program for the Geo-Science Laser Altimeter System (GLAS) satellite lidar project (launch date 2002). We will present an overview demonstrating how MPL-Net results are used to help prepare the GLAS data processing algorithms and assist in the calibration/validation of the GLAS data products.

  1. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  2. Report on all ARRA Funded Technical Work

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. Thismore » project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.« less

  3. KSC-2012-3946

    NASA Image and Video Library

    2012-07-19

    CAPE CANAVERAL, Fla. – This aerial view shows a rock and crater-filled planetary scape that has been built at the north end of the Kennedy Space Center’s Shuttle Landing Facility. The site will allow engineers to test the Autonomous Landing and Hazard Avoidance Technology, or ALHAT system on the Project Morpheus lander. Testing will demonstrate ALHAT’s ability to provide required navigation data negotiating the Morpheus lander away from risks during descent. Checkout of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free flight. The SLF site will provide the lander with the kind of field necessary for realistic testing. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html Photo credit: NASA/Kim Shiflett

  4. KSC-2012-3945

    NASA Image and Video Library

    2012-07-19

    CAPE CANAVERAL, Fla. –This aerial view shows a rock and crater-filled planetary scape that has been built at the north end of the Kennedy Space Center’s Shuttle Landing Facility. The site will allow engineers to test the Autonomous Landing and Hazard Avoidance Technology, or ALHAT system on the Project Morpheus lander. Testing will demonstrate ALHAT’s ability to provide required navigation data negotiating the Morpheus lander away from risks during descent. Checkout of the prototype lander has been ongoing at NASA’s Johnson Space Center in Houston in preparation for its first free flight. The SLF site will provide the lander with the kind of field necessary for realistic testing. Project Morpheus is one of 20 small projects comprising the Advanced Exploration Systems, or AES, program in NASA’s Human Exploration and Operations Mission Directorate. AES projects pioneer new approaches for rapidly developing prototype systems, demonstrating key capabilities and validating operational concepts for future human missions beyond Earth orbit. For more information on Project Morpheus, visit http://www.nasa.gov/centers/johnson/exploration/morpheus/index.html Photo credit: NASA/Kim Shiflett

  5. ORD'S BROWNFIELDS RESEARCH

    EPA Science Inventory

    SMARTe is a web-based,decision support tool for developing and evaluating plans for redevelopment/revitalization of potentially contaminated sites. Brownfield project stakeholders should use SMARTe to: (1) Assess both market and non-market costs and benefits of potential redevelo...

  6. 15 CFR 921.80 - Application information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... awards for preacquisition, acquisition and development, operation and management, and special education...-site selection, operation and management, research, and education and interpretive awards. The... projects, or restorative activities involving construction, must include a preliminary engineering report...

  7. YUCCA MOUNTAIN SITE DESCRIPTION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    A.M. Simmons

    The ''Yucca Mountain Site Description'' summarizes, in a single document, the current state of knowledge and understanding of the natural system at Yucca Mountain. It describes the geology; geochemistry; past, present, and projected future climate; regional hydrologic system; and flow and transport within the unsaturated and saturated zones at the site. In addition, it discusses factors affecting radionuclide transport, the effect of thermal loading on the natural system, and tectonic hazards. The ''Yucca Mountain Site Description'' is broad in nature. It summarizes investigations carried out as part of the Yucca Mountain Project since 1988, but it also includes work donemore » at the site in earlier years, as well as studies performed by others. The document has been prepared under the Office of Civilian Radioactive Waste Management quality assurance program for the Yucca Mountain Project. Yucca Mountain is located in Nye County in southern Nevada. The site lies in the north-central part of the Basin and Range physiographic province, within the northernmost subprovince commonly referred to as the Great Basin. The basin and range physiography reflects the extensional tectonic regime that has affected the region during the middle and late Cenozoic Era. Yucca Mountain was initially selected for characterization, in part, because of its thick unsaturated zone, its arid to semiarid climate, and the existence of a rock type that would support excavation of stable openings. In 1987, the United States Congress directed that Yucca Mountain be the only site characterized to evaluate its suitability for development of a geologic repository for high-level radioactive waste and spent nuclear fuel.« less

  8. Decontamination systems information and research programs. Quarterly report, July 1--August 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-07-01

    The US contains numerous hazardous waste sites. Many sites are on private land near operating units of various companies. An effort is being made to determine the conditions under which such sites can be remediated voluntarily. The objective of the project will be to first assess the interest and willingness of industry in the Kanawha River Valley, WV to participate in discussions that would lead toward voluntary cleanup activities. The second will be to implement the activities agreed upon by the interested parties. The project will first involve individual discussions with the industrial, government, and other organized groups in themore » area. These discussions will help determine the feasibility of organizing voluntary efforts. If the discussions indicate that conditions may be favorable for developing individual or group voluntary cleanup projects, a working group will be convened to establish the environmental goals of the project as well as the technical approach for achieving those goals. The projects for the 1996 WVU Cooperative Agreement are categorized into three task focus areas: Task 1.0 Contaminant Plume Containment and Remediation, Task 2.0 Cross Cutting Innovative Technologies, and Task 3.0 Small Business Support Program. Summaries of the accomplishments for the subtasks reporting under these categories during the third quarter, 1 July 96 through 30 September 96, are presented.« less

  9. A New Framework for Adaptive Sampling and Analysis During Long- Term Monitoring and Remedial Action Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minsker, Barbara

    2003-06-01

    The Argonne team has gathered available data on monitoring wells and measured hydraulic heads from the Argonne 317/319 site and sent it to UIUC. Xiaodong Li, a research assistant supported by the project, has reviewed the data and is beginning to fit spatiotemporal statistical models to it. Another research assistant, Yonas Demissie, has gotten the site's Modflow model working and is developing a transport model that will be used to generate artificial data. Abhishek Singh, a third research assistant supported by the project, has performed a literature review on inverse modeling and is receiving training on the software that willmore » be used in this project (D2K). He has also created two models of user preferences and successfully implemented them with an interactive genetic algorithm on test functions. Meghna Babbar, the fourth research assistant supported by the project, has created an interactive genetic algorithm code and initial user interface in D2K. Gayathri Gopalakrishnan, the last research assistant who is partially supported by the project, has collected and analyzed data from the phytoremediation systems at the 317/319 site. She has found good correlations between concentrations in the ground water and in branches of the trees, which indicates excellent promise for using the trees as cost-effective long-term monitoring of the contaminants.« less

  10. Sustainable Development Strategy Of Domestic Waste Infrastructure In The City Of Surakarta

    NASA Astrophysics Data System (ADS)

    Rezagama, Arya; Purwono; Damayanti, Verika

    2018-02-01

    Shifting from traditional system to large, centralised infrastructure domestic waste is widely complex challenge. Most of fhe sanitary system on household in Surakarta use on site septictank, 17% sewerage system reached and16,0% stll open defecations. Sanitation development sustained aims to develop policy and strategies waste management domestic Surakarta in the long term (20 years). The projection use quantitative method and institutional condition approach by SWOT analysis. Surakarta City get priority sanitation urban planning from Indonesian government in Presiden Joko Widodo era. The domestic waste management systems that is Surakarta divided into system on-site and system off site. Waste Water Treatment Plant (WWTP) mojosongo, WWTP pucangsawit and WWTP Semanggi will be developed to treat 30% domestic waste of Surakarta Residence. While on-site system will are served 70% residence by service programs Regular Cleaning Septictank. The toughest challenge is how to increase community participation in waste management and improve the company"s financial condition. Sanitation sustainable development is going to happen if supported by facility development also good, institutional development, the arrangement that oversees, and the public participation.

  11. Session: Development and application of guidelines for siting, constructing, operating and monitoring wind turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manville, Albert; Hueckel, Greg

    2004-09-01

    This session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a discussion/question and answer period. The two papers were: 'Development and Application of USFWS Guidance for Site Evaluation, Siting, Construction, Operation and Monitoring of Wind Turbines' by Albert Manville and 'Wind Power in Washington State' by Greg Hueckel. The session provided a comparison of wind project guidelines developed by the U.S. Fish and Wildlife Service (USFWS) in May 2003 and the Washington State Department of Fish and Wildlife in August 2003. Questions addressed included: is there a need or desire for uniform national or statemore » criteria; can other states learn from Washington State's example, or from the USFWS voluntary guidelines; should there be uniform requirements/guidelines/check-lists for the siting, operation, monitoring, and mitigation to prevent or minimize avian, bat, and other wildlife impacts.« less

  12. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteriamore » which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.« less

  13. Preliminary Concept of Operations for the Spent Fuel Management System--WM2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cumberland, Riley M; Adeniyi, Abiodun Idowu; Howard, Rob L

    The Nuclear Fuels Storage and Transportation Planning Project (NFST) within the U.S. Department of Energy s Office of Nuclear Energy is tasked with identifying, planning, and conducting activities to lay the groundwork for developing interim storage and transportation capabilities in support of an integrated waste management system. The system will provide interim storage for commercial spent nuclear fuel (SNF) from reactor sites and deliver it to a repository. The system will also include multiple subsystems, potentially including; one or more interim storage facilities (ISF); one or more repositories; facilities to package and/or repackage SNF; and transportation systems. The project teammore » is analyzing options for an integrated waste management system. To support analysis, the project team has developed a Concept of Operations document that describes both the potential integrated system and inter-dependencies between system components. The goal of this work is to aid systems analysts in the development of consistent models across the project, which involves multiple investigators. The Concept of Operations document will be updated periodically as new developments emerge. At a high level, SNF is expected to travel from reactors to a repository. SNF is first unloaded from reactors and placed in spent fuel pools for wet storage at utility sites. After the SNF has cooled enough to satisfy loading limits, it is placed in a container at reactor sites for storage and/or transportation. After transportation requirements are met, the SNF is transported to an ISF to store the SNF until a repository is developed or directly to a repository if available. While the high level operation of the system is straightforward, analysts must evaluate numerous alternative options. Alternative options include the number of ISFs (if any), ISF design, the stage at which SNF repackaging occurs (if any), repackaging technology, the types of containers used, repository design, component sizing, and timing of events. These alternative options arise due to technological, economic, or policy considerations. As new developments regularly emerge, the operational concepts will be periodically updated. This paper gives an overview of the different potential alternatives identified in the Concept of Operations document at a conceptual level.« less

  14. Using the WWW to Make YOHKOH SXT Images Available to the Public: The YOHKOH Public Outreach Project

    NASA Astrophysics Data System (ADS)

    Larson, M.; McKenzie, D.; Slater, T.; Acton, L.; Alexander, D.; Freeland, S.; Lemen, J.; Metcalf, T.

    1997-05-01

    The Yohkoh Public Outreach Project (YPOP) is funded by NASA as one of the Information Infrastructure Technology and Applications Cooperative Agreement Teams to create public access to high quality Yohkoh SXT data via the World Wide Web. These products are being made available to the scientific research community, K-12 schools, and informal education centers including planetaria, museums, and libraries. The project aims to utilize the intrinsic excitement of the SXT data, and in particular the SXT movies, to develop science learning tools and classroom activities. The WWW site at URL: http://www.space.lockheed.com/YPOP/ uses a movie theater theme to highlight available Yohkoh movies in a non-intimidating and entertaining format for non-scientists. The site features lesson plans, 'solar' activities, slide shows and, of course, a variety of movies about the Sun. Classroom activities are currently undergoing development with a team of scientists and K-12 teachers for distribution in late 1997. We will display the products currently online, which include a solar classroom with activities for teachers, background resources, and a virtual tour of our Sun.

  15. KSC-2012-3731

    NASA Image and Video Library

    2012-07-09

    CAPE CANAVERAL, Fla. – Near the Hypergolic Maintenance Facility at NASA’s Kennedy Space Center in Florida, a groundbreaking ceremony was held to mark the location of the Ground Operations Demonstration Unit Liquid Hydrogen, or GODU LH2, test site. From left, are Johnny Nguyen, Fluids Test and Technology Development branch chief Emily Watkins, engineering intern Jeff Walls, Engineering Services Contract, or ESC, Cryogenics Test Lab engineer Kelly Currin, systems engineer Stephen Huff and Rudy Werlink partially hidden, cryogenics engineers Angela Krenn, systems engineer Doug Hammond, command and control engineer in the electrical division William Notardonato, GODU LH2 project manager and Kevin Jumper, ESC Cryogenics Test Lab manager. The GODU LH2 test site is one of the projects in NASA’s Advanced Exploration Systems Program. The site will be used to demonstrate advanced liquid hydrogen systems that are cost and energy efficient ways to store and transfer liquid hydrogen during process, loading, launch and spaceflight. The main components of the site will be a storage tank and a cryogenic refrigerator. Photo credit: NASA/Dimitri Gerondidakis

  16. KSC-2012-3732

    NASA Image and Video Library

    2012-07-09

    CAPE CANAVERAL, Fla. – Near the Hypergolic Maintenance Facility at NASA’s Kennedy Space Center in Florida, a groundbreaking ceremony was held to mark the location of the Ground Operations Demonstration Unit Liquid Hydrogen, or GODU LH2, test site. From left, are Johnny Nguyen, Fluids Test and Technology Development branch chief Emily Watkins, engineering intern Jeff Walls, Engineering Services Contract, or ESC, Cryogenics Test Lab engineer Kelly Currin, systems engineer Stephen Huff and Rudy Werlink partially hidden, cryogenics engineers Angela Krenn, systems engineer Doug Hammond, command and control engineer in the electrical division William Notardonato, GODU LH2 project manager and Kevin Jumper, ESC Cryogenics Test Lab manager. The GODU LH2 test site is one of the projects in NASA’s Advanced Exploration Systems Program. The site will be used to demonstrate advanced liquid hydrogen systems that are cost and energy efficient ways to store and transfer liquid hydrogen during process, loading, launch and spaceflight. The main components of the site will be a storage tank and a cryogenic refrigerator. Photo credit: NASA/Dimitri Gerondidakis

  17. Towards AN Inventory for Archaeological Heritage Management in Israel

    NASA Astrophysics Data System (ADS)

    Alef, Y.

    2017-08-01

    The vast amount of archaeological data and information that is systematically accumulated in the Israel Antiquities Authority database, has not yet been transformed into a tool for heritage management, i.e. accessible knowledge of the sites' cultural significance and risk assessment that is needed to support wise decision making regarding its future. As a response, a pilot project for developing an inventory for the archaeological heritage management was launched. A basic ESRI ArcGIS Online system was developed as a prototype, following the categories recommended in international standards for documentation. Five field surveys implementing the GIS system were conducted to examine different aspects and workflows: ancient synagogues in the Galilee, sites at risk, mosaics in Tel Shiqmona, the ancient settlement of Huqoq and sites included in The National Master Plan for Forests and Afforestation. The pilot project revealed the main gaps in knowledge and the critical faults in the working procedures. In spite of the systems' technological limitations, the results were convincing enough to promote a multidisciplinary discussion about the need for integration of significance and risk assessment in the working processes of the organization.

  18. Fish vs. power: Remaking salmon, science and society on the Fraser River, 1900--1960

    NASA Astrophysics Data System (ADS)

    Evenden, Matthew Dominic

    Overlapping resource demands made the Fraser River a contested site of development politics in twentieth century British Columbia. Since the turn of the century, power interests surveyed the river's flow, sited dams and promoted development schemes. Fisheries interests, on the other hand, sought to maintain the river as salmon spawning habitat. They questioned the necessity of dams, supported fisheries research and rehabilitation and organized anti-development coalitions. Before the mid-1950s a number of dam projects proceeded on Fraser tributaries and major landslides at Hells Gate modeled the dangers of main stem development. Because of the concerted political lobbying of fisheries groups, the skeptical appraisal of fisheries scientists to development proposals and the legal and political authority of the federal Department of Fisheries and the International Pacific Salmon Fisheries Commission, major dam projects were defeated on the Fraser in the late 1950s. Delayed development on the Fraser helped to spur hydroelectric projects on other rivers in the province; the fish-power problem on the Fraser altered the province's spatial economy of power. Once development began on the Columbia and Peace Rivers, the Fraser was protected by implication. The study combines approaches from environmental history, the history of science and political economy to demonstrate the intersections and interactions between nature, knowledge and society. Research was conducted at eleven archives in Canada and the United States in the papers of organizations, corporations, government departments, politicians, scientists and individuals.

  19. Steamtown District Heating and Cooling Project, Scranton, Pennsylvania. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report summarizes the activities of a study intended to examine the feasibility of a district heating and cooling alternative for the Steamtown National Historic Site in Scranton, PA. The objective of the study was to investigate the import of steam from the existing district heating system in Scranton which is operated by the Community Central Energy Corporation and through the use of modern technology provide hot and chilled water to Steamtown for its internal heating and cooling requirements. Such a project would benefit Steamtown by introducing a clean technology, eliminating on-site fuel use, avoiding first costs for central heatingmore » and cooling plants and reducing operation and maintenance expenditures. For operators of the existing district heating system, this project represents an opportunity to expand their customer base and demonstrate new technologies. The study was conducted by Joseph Technology Corporation, Inc. and performed for the Community Central Energy Corporation through a grant by the US Department of Energy. Steamtown was represented by the National Park Service, the developers of the site.« less

  20. Making YOHKOH SXT Images Available to the Public: The YOHKOH Public Outreach Project

    NASA Astrophysics Data System (ADS)

    Larson, M. B.; McKenzie, D.; Slater, T.; Acton, L.; Alexander, D.; Freeland, S.; Lemen, J.; Metcalf, T.

    1999-05-01

    The NASA funded Yohkoh Public Outreach Project (YPOP) provides public access to high quality Yohkoh SXT data via the World Wide Web. The products of this effort are available to the scientific research community, K-12 schools, and informal education centers including planetaria, museums, and libraries. The project utilizes the intrinsic excitement of the SXT data, and in particular the SXT movies, to develop science learning tools and classroom activities. The WWW site at URL: http://solar.physics.montana.edu/YPOP/ uses a movie theater theme to highlight available Yohkoh movies in a format that is entertaining and inviting to non-scientists. The site features informational tours of the Sun as a star, the solar magnetic field, the internal structure and the Sun's general features. The on-line Solar Classroom has proven very popular, showcasing hand-on activities about image filtering, the solar cycle, satellite orbits, image processing, construction of a model Yohkoh satellite, solar rotation, measuring sunspots and building a portable sundial. The YPOP Guestbook has been helpful in evaluating the usefulness of the site with over 300 detailed comments to date.

Top