Sample records for site planning process

  1. Model Development and Process Analysis for Lean Cellular Design Planning in Aerospace Assembly and Manufacturing

    NASA Astrophysics Data System (ADS)

    Hilburn, Monty D.

    Successful lean manufacturing and cellular manufacturing execution relies upon a foundation of leadership commitment and strategic planning built upon solid data and robust analysis. The problem for this study was to create and employ a simple lean transformation planning model and review process that could be used to identify functional support staff resources required to plan and execute lean manufacturing cells within aerospace assembly and manufacturing sites. The lean planning model was developed using available literature for lean manufacturing kaizen best practices and validated through a Delphi panel of lean experts. The resulting model and a standardized review process were used to assess the state of lean transformation planning at five sites of an international aerospace manufacturing and assembly company. The results of the three day, on-site review were compared with baseline plans collected from each of the five sites to determine if there analyzed, with focus on three critical areas of lean planning: the number and type of manufacturing cells identified, the number, type, and duration of planned lean and continuous kaizen events, and the quantity and type of functional staffing resources planned to support the kaizen schedule. Summarized data of the baseline and on-site reviews was analyzed with descriptive statistics. ANOVAs and paired-t tests at 95% significance level were conducted on the means of data sets to determine if null hypotheses related to cell, kaizen event, and support resources could be rejected. The results of the research found significant differences between lean transformation plans developed by site leadership and plans developed utilizing the structured, on-site review process and lean transformation planning model. The null hypothesis that there was no difference between the means of pre-review and on-site cell counts was rejected, as was the null hypothesis that there was no significant difference in kaizen event plans. These factors are critical inputs into the support staffing resources calculation used by the lean planning model. Null hypothesis related to functional support staff resources was rejected for most functional groups, indicating that the baseline site plan inadequately provided for cross-functional staff involvement to support the lean transformation plan. Null hypotheses related to total lean transformation staffing could not be rejected, indicating that while total staffing plans were not significantly different than plans developed during the on-site review and through the use of the lean planning model, the allocation of staffing among various functional groups such as engineering, production, and materials planning was an issue. The on-site review process and simple lean transformation plan developed was determined to be useful in identifying short-comings in lean transformation planning within aerospace manufacturing and assembly sites. It was concluded that the differences uncovered were likely contributing factors affecting the effectiveness of aerospace manufacturing sites' implementation of lean cellular manufacturing.

  2. The School Site Planner. Land for Learning. Site Selection, Site Planning, Playgrounds, Recreation, and Athletic Fields.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Support.

    The selection and planning of sites for school facilities can be critical and difficult due to the varied and complex demands schools must satisfy. This publication addresses the many factors that need consideration during the process of site selection, planning, development, and use. The report examines not only the site selection and planning…

  3. Planning a multi-site, complex intervention for homeless people with mental illness: the relationships between the national team and local sites in Canada's At Home/Chez Soi project.

    PubMed

    Nelson, Geoffrey; Macnaughton, Eric; Goering, Paula; Dudley, Michael; O'Campo, Patricia; Patterson, Michelle; Piat, Myra; Prévost, Natasha; Strehlau, Verena; Vallée, Catherine

    2013-06-01

    This research focused on the relationships between a national team and five project sites across Canada in planning a complex, community intervention for homeless people with mental illness called At Home/Chez Soi, which is based on the Housing First model. The research addressed two questions: (a) what are the challenges in planning? and (b) what factors that helped or hindered moving project planning forward? Using qualitative methods, 149 national, provincial, and local stakeholders participated in key informant or focus group interviews. We found that planning entails not only intervention and research tasks, but also relational processes that occur within an ecology of time, local context, and values. More specifically, the relationships between the national team and the project sites can be conceptualized as a collaborative process in which national and local partners bring different agendas to the planning process and must therefore listen to, negotiate, discuss, and compromise with one another. A collaborative process that involves power-sharing and having project coordinators at each site helped to bridge the differences between these two stakeholder groups, to find common ground, and to accomplish planning tasks within a compressed time frame. While local context and culture pushed towards unique adaptations of Housing First, the principles of the Housing First model provided a foundation for a common approach across sites and interventions. The implications of the findings for future planning and research of multi-site, complex, community interventions are noted.

  4. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.« less

  5. Distributed query plan generation using multiobjective genetic algorithm.

    PubMed

    Panicker, Shina; Kumar, T V Vijay

    2014-01-01

    A distributed query processing strategy, which is a key performance determinant in accessing distributed databases, aims to minimize the total query processing cost. One way to achieve this is by generating efficient distributed query plans that involve fewer sites for processing a query. In the case of distributed relational databases, the number of possible query plans increases exponentially with respect to the number of relations accessed by the query and the number of sites where these relations reside. Consequently, computing optimal distributed query plans becomes a complex problem. This distributed query plan generation (DQPG) problem has already been addressed using single objective genetic algorithm, where the objective is to minimize the total query processing cost comprising the local processing cost (LPC) and the site-to-site communication cost (CC). In this paper, this DQPG problem is formulated and solved as a biobjective optimization problem with the two objectives being minimize total LPC and minimize total CC. These objectives are simultaneously optimized using a multiobjective genetic algorithm NSGA-II. Experimental comparison of the proposed NSGA-II based DQPG algorithm with the single objective genetic algorithm shows that the former performs comparatively better and converges quickly towards optimal solutions for an observed crossover and mutation probability.

  6. Distributed Query Plan Generation Using Multiobjective Genetic Algorithm

    PubMed Central

    Panicker, Shina; Vijay Kumar, T. V.

    2014-01-01

    A distributed query processing strategy, which is a key performance determinant in accessing distributed databases, aims to minimize the total query processing cost. One way to achieve this is by generating efficient distributed query plans that involve fewer sites for processing a query. In the case of distributed relational databases, the number of possible query plans increases exponentially with respect to the number of relations accessed by the query and the number of sites where these relations reside. Consequently, computing optimal distributed query plans becomes a complex problem. This distributed query plan generation (DQPG) problem has already been addressed using single objective genetic algorithm, where the objective is to minimize the total query processing cost comprising the local processing cost (LPC) and the site-to-site communication cost (CC). In this paper, this DQPG problem is formulated and solved as a biobjective optimization problem with the two objectives being minimize total LPC and minimize total CC. These objectives are simultaneously optimized using a multiobjective genetic algorithm NSGA-II. Experimental comparison of the proposed NSGA-II based DQPG algorithm with the single objective genetic algorithm shows that the former performs comparatively better and converges quickly towards optimal solutions for an observed crossover and mutation probability. PMID:24963513

  7. Advance care planning in a community setting.

    PubMed

    Connolly, Josaleen; Milligan, Stuart; Stevens, Elaine; Jackson, Susan; Rooney, Kevin

    2015-02-10

    To evaluate the effects of implementing an advance care planning process within pilot sites in North Ayrshire in 2010, focusing on people with palliative care needs. Data were collected from participants in advance care planning training using a questionnaire. Semi-structured interviews were conducted and an audit of documentation was undertaken. Thirty nine questionnaires were returned, a response rate of 16%. Twenty four out of 25 (96%) participants rated the training as having improved their understanding of the advance care planning process. The general consensus in interviews was that advance care planning is a worthwhile process. Participants reported patients achieving their preferred place of end of life care and greater consultation regarding hospitalisation. Within the pilot sites, advance care planning training enhanced the ability of professionals to implement the advance care planning process and record the wishes of patients and residents.

  8. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...

  9. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...

  10. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...

  11. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.« less

  12. March 2016 Memo: Planning for Removal and Remedial Activities at Hardrock Mining and Mineral Processing Sites with Fluid Hazards

    EPA Pesticide Factsheets

    Memo from EPA Assistant Administrator Mathy Stanislaus, regarding planning for removal and remedial activities at hardrock mining and mineral processing sites with fluid hazards, and to share the Agency’s expectations for the work that is done at these sit

  13. SUPERFUND TREATABILITY CLEARINGHOUSE: SOIL STABILIZATION PILOT STUDY, UNITED CHROME NPL SITE PILOT STUDY AND HEALTH AND SAFETY PROGRAM, UNITED CHROME NPL SITE PILOT STUDY

    EPA Science Inventory

    This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...

  14. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  15. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  16. Site characterization report for the basalt waste isolation project. Volume II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987,more » and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.« less

  17. Advanced planning for ISS payload ground processing

    NASA Astrophysics Data System (ADS)

    Page, Kimberly A.

    2000-01-01

    Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .

  18. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  19. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  20. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  1. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, Matthew T.; Judd, Steven L.

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  2. THE SCHOOL SITE--ITS SELECTION, ANALYSIS, DEVELOPMENT AND MAINTENANCE.

    ERIC Educational Resources Information Center

    BRUNING, WALTER F.

    SCHOOL ADMINISTRATORS AND COMMUNITY PLANNERS CAN AID THE SCHOOL SITE SELECTION PROCESS BY WORKING TOGETHER ON A COMMUNITY MASTER PLAN. MANY COMMUNITIES HAVE DEVELOPED SUCH A PLAN UNDER THE STATE AND FEDERALLY AIDED 701 PROGRAM. SOUND SITE SELECTION PRINCIPLES REQUIRE CONSIDERATION OF OTHER FACTORS THAN STUDENT POPULATION DISTRIBUTION. IDEALLY…

  3. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  4. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8... redetermination processes via an Internet Web site; and (iii) A system that transmits codes to network pharmacies...— (1) A toll-free customer call center that— (i) Is open during usual business hours. (ii) Provides...

  5. San Diego's Capital Planning Process

    ERIC Educational Resources Information Center

    Lytton, Michael

    2009-01-01

    This article describes San Diego's capital planning process. As part of its capital planning process, the San Diego Unified School District has developed a systematic analysis of functional quality at each of its school sites. The advantage of this approach is that it seeks to develop and apply quantifiable metrics and standards for the more…

  6. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... satisfied in full by the licensee, and (2) The total cost of remedial action required at the site, together... at the site, as determined in the approved plan for subsequent remedial action, by the Federal...

  7. Data Validation Package September 2016 Groundwater and Surface Water Sampling at the Slick Rock, Colorado, Processing Sites January 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Traub, David; Nguyen, Jason

    The Slick Rock, Colorado, Processing Sites are referred to as the Slick Rock West Processing Site (SRK05) and the Slick Rock East Processing Site (SRK06). This annual event involved sampling both sites for a total of 16 monitoring wells and 6 surface water locations as required by the 2006 Draft Final Ground Water Compliance Action Plan for the Slick Rock, Colorado, Processing Sites (GCAP). A domestic well was also sampled at a property adjacent to the Slick Rock East site at the request of the landowner.

  8. Ants as a measure of effectiveness of habitat conservation planning in southern California

    USGS Publications Warehouse

    Mitrovich, Milan J.; Matsuda, Tritia; Pease, Krista H.; Fisher, Robert N.

    2010-01-01

    In the United States multispecies habitat conservation plans were meant to be the solution to conflicts between economic development and protection of biological diversity. Although now widely applied, questions exist concerning the scientific credibility of the conservation planning process and effectiveness of the plans. We used ants to assess performance of one of the first regional conservation plans developed in the United States, the Orange County Central-Coastal Natural Community Conservation Plan (NCCP), in meeting its broader conservation objectives of biodiversity and ecosystem-level protection. We collected pitfall data on ants for over 3 years on 172 sites established across a network of conservation lands in coastal southern California. Although recovered native ant diversity for the study area was high, site-occupancy models indicated the invasive and ecologically disruptive Argentine ant ( Linepithema humile) was present at 29% of sites, and sites located within 200 m of urban and agricultural areas were more likely to have been invaded. Within invaded sites, native ants were largely displaced, and their median species richness declined by more than 60% compared with uninvaded sites. At the time of planning, 24% of the 15,133-ha reserve system established by Orange County NCCP fell within 200 m of an urban or agricultural edge. With complete build out of lands surrounding the reserve, the proportion of the reserve system vulnerable to invasion will grow to 44%. Our data indicate that simply protecting designated areas from development is not enough. If habitat conservation plans are to fulfill their conservation promise of ecosystem-level protection, a more-integrated and systematic approach to the process of habitat conservation planning is needed.

  9. Accidental Release of Chlorine from a Storage Facility and an On-Site Emergency Mock Drill: A Case Study

    PubMed Central

    Soman, Ambalathumpara Raman; Sundararaj, Gopalswamy

    2015-01-01

    In the current industrial scenario there is a serious need for formulating strategies to handle hazardous substances in the safest way. Manufacture, storage, and use of hazardous substances pose a serious risk to industry, people, and the environment. Accidental release of toxic chemicals can lead to emergencies. An emergency response plan (ERP) is inevitable to minimize the adverse effects of such releases. The on-site emergency plan is an integral component of any process safety and risk management system. This paper deals with an on-site emergency response plan for a chlorine manufacturing industry. It was developed on the basis of a previous study on chlorine release and a full scale mock drill has been conducted for testing the plan. Results indicated that properly trained personnel can effectively handle each level of incidents occurring in the process plant. As an extensive guideline to the district level government authorities for off-site emergency planning, risk zone has also been estimated with reference to a chlorine exposure threshold of 3 ppm. PMID:26171416

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  11. Data Validation Package - April and July 2015 Groundwater and Surface Water Sampling at the Gunnison, Colorado, Processing Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Campbell, Sam

    This event included annual sampling of groundwater and surface water locations at the Gunnison, Colorado, Processing Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites. Samples were collected from 28 monitoring wells, three domestic wells, and six surface locations in April at the processing site as specified in the 2010 Ground Water Compliance Action Plan for the Gunnison, Colorado, Processing Site. Domestic wells 0476 and 0477 were sampled in July because the homes were unoccupied in April, and the wells were not in use. Duplicate samplesmore » were collected from locations 0113, 0248, and 0477. One equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. No issues were identified during the data validation process that requires additional action or follow-up.« less

  12. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  13. Data Validation Package, April and June 2016 Groundwater and Surface Water Sampling at the Gunnison, Colorado, Processing Site, October 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Campbell, Sam

    This event included annual sampling of groundwater and surface water locations at the Gunnison, Colorado, Processing Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Samples were collected from 28 monitoring wells, three domestic wells, and six surface locations in April at the processing site as specified in the draft 2010 Ground Water Compliance Action Plan for the Gunnison, Colorado, Processing Site. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Domestic wells 0476 and 0477 weremore » sampled in June because the homes were unoccupied in April, and the wells were not in use. Duplicate samples were collected from locations 0126, 0477, and 0780. One equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. See Attachment 2, Trip Reports for additional details. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that requires additional action or follow-up. An assessment of anomalous data is included in Attachment 3. Interpretation and presentation of results, including an assessment ofthe natural flushing compliance strategy, will be reported in the upcoming 2016 Verification Monitoring Report. U.S.« less

  14. Superfund record of decision (EPA Region 3): Ohio River Park Site, Operable Unit 3, Neville Island, PA, September 17, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    This Record of Decision (ROD) presents the selected remedial action plan for the Ohio River Park Superfund Site (the Site) in Allegheny County, Pennsylvania. The remedial action plan in this document is presented as the permanent remedy for controlling the groundwater at the Site. This remedy is comprised of: monitoring of natural attenuation processes to measure changes in contaminant concentrations in groundwater plume at the Site until the cleanup levels are achieved; deed restriction preventing residential use of groundwater at the Site.

  15. A Climate Change Risk and Resilience Assessment Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, Lisa

    This presentation summarizes a site-specific climate resilience planning process applied at two different U.S. Department of Energy sites, in Colorado and along the Gulf Coast that federal site managers can use to identify and analyze potential climate-related risks and explore resilience options to minimize those risks.

  16. The Four Levels of Web Site Development Expertise.

    ERIC Educational Resources Information Center

    Ingram, Albert L.

    2000-01-01

    Discusses the design of Web pages and sites and proposes a four-level model of Web development expertise that can serve as a curriculum overview or as a plan for an individual's professional development. Highlights include page design, media use, client-side processing, server-side processing, and site structure. (LRW)

  17. The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; themore » importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.« less

  18. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  19. Offshore Wind Guidance Document: Oceanography and Sediment Stability (Version 1) Development of a Conceptual Site Model.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, Jesse D.; Jason Magalen; Craig Jones

    This guidance document provide s the reader with an overview of the key environmental considerations for a typical offshore wind coastal location and the tools to help guide the reader through a thoro ugh planning process. It will enable readers to identify the key coastal processes relevant to their offshore wind site and perform pertinent analysis to guide siting and layout design, with the goal of minimizing costs associated with planning, permitting , and long - ter m maintenance. The document highlight s site characterization and assessment techniques for evaluating spatial patterns of sediment dynamics in the vicinity of amore » wind farm under typical, extreme, and storm conditions. Finally, the document des cribe s the assimilation of all of this information into the conceptual site model (CSM) to aid the decision - making processes.« less

  20. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less

  1. Tracking the Short Term Planning (STP) Development Process

    NASA Technical Reports Server (NTRS)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  2. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  3. Data Validation Package October 2016 Groundwater and Surface Water Sampling at the Monticello, Utah, Disposal and Processing Sites January 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Jason; Smith, Fred

    Sampling Period: October 10–12, 2016. This semiannual event includes sampling groundwater and surface water at the Monticello Disposal and Processing Sites. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated) and Program Directive MNT-2016-01. Samples were collected from 54 of 64 planned locations (16 of 17 former mill site wells, 15 of 18 downgradient wells, 7 of 9 downgradient permeable reactive barrier wells, 3 of 3 bedrock wells, 4 of 7 seeps and wetlands, and 9 of 10 surface water locations).

  4. Strategic plan for Hanford site information management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandatesmore » of DOE.« less

  5. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  6. AFRL Solid Propellant Laboratory Explosive Siting and Renovation Lessons Learned

    DTIC Science & Technology

    2010-07-01

    Area 1-30A explosive facility and provide consultation/support during the review process for each of the site plans. • Applied Engineering Services...provided consultation/support during the siting review process. • Applied Engineering Services (AES) Inc. performed a detailed structural, blast, thermal... Applied Engineering Services (AES) Inc. structural, blast, thermal and fragment hazard analysis to determine the appropriate siting values based on

  7. SU-F-T-231: Improving the Efficiency of a Radiotherapy Peer-Review System for Quality Assurance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hsu, S; Basavatia, A; Garg, M

    Purpose: To improve the efficiency of a radiotherapy peer-review system using a commercially available software application for plan quality evaluation and documentation. Methods: A commercial application, FullAccess (Radialogica LLC, Version 1.4.4), was implemented in a Citrix platform for peer-review process and patient documentation. This application can display images, isodose lines, and dose-volume histograms and create plan reports for peer-review process. Dose metrics in the report can also be benchmarked for plan quality evaluation. Site-specific templates were generated based on departmental treatment planning policies and procedures for each disease site, which generally follow RTOG protocols as well as published prospective clinicalmore » trial data, including both conventional fractionation and hypo-fractionation schema. Once a plan is ready for review, the planner exports the plan to FullAccess, applies the site-specific template, and presents the report for plan review. The plan is still reviewed in the treatment planning system, as that is the legal record. Upon physician’s approval of a plan, the plan is packaged for peer review with the plan report and dose metrics are saved to the database. Results: The reports show dose metrics of PTVs and critical organs for the plans and also indicate whether or not the metrics are within tolerance. Graphical results with green, yellow, and red lights are displayed of whether planning objectives have been met. In addition, benchmarking statistics are collected to see where the current plan falls compared to all historical plans on each metric. All physicians in peer review can easily verify constraints by these reports. Conclusion: We have demonstrated the improvement in a radiotherapy peer-review system, which allows physicians to easily verify planning constraints for different disease sites and fractionation schema, allows for standardization in the clinic to ensure that departmental policies are maintained, and builds a comprehensive database for potential clinical outcome evaluation.« less

  8. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are beingmore » made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.« less

  9. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  10. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  11. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  12. 28 CFR Appendix E to Part 61 - United States Marshals Service Procedures Relating to the Implementation of the National...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... minimizing the use of natural resources, and by improving planning and decision-making processes to avoid...) Integrating the NEPA process in the early stages of planning to ensure that decisions reflect environmental... site. The exclusion applies only if: (i) The structure and proposed use comply with local planning and...

  13. Wind Powering America State Outreach. Final Technical Report: Washington State

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stearns, Tim

    2013-09-30

    The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less

  14. Delivery quality assurance with ArcCHECK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neilson, Christopher; Klein, Michael; Barnett, Rob

    2013-04-01

    Radiation therapy requires delivery quality assurance (DQA) to ensure that treatment is accurate and closely follows the plan. We report our experience with the ArcCHECK phantom and investigate its potential optimization for the DQA process. One-hundred seventy DQA plans from 84 patients were studied. Plans were classified into 2 groups: those with the target situated on the diodes of the ArcCHECK (D plans) and those with the target situated at the center (C plans). Gamma pass rates for 8 target sites were examined. The parameters used to analyze the data included 3%/3 mm with the Van Dyk percent difference criteriamore » (VD) on, 3%/3 mm with the VD off, 2%/2 mm with the VD on, and x/3 mm with the VD on and the percentage dosimetric agreement “x” for diode plans adjusted. D plans typically displayed maximum planned dose (MPD) on the cylindrical surface containing ArcCHECK diodes than center plans, resulting in inflated gamma pass rates. When this was taken into account by adjusting the percentage dosimetric agreement, C plans outperformed D plans by an average of 3.5%. ArcCHECK can streamline the DQA process, consuming less time and resources than radiographic films. It is unnecessary to generate 2 DQA plans for each patient; a single center plan will suffice. Six of 8 target sites consistently displayed pass rates well within our acceptance criteria; the lesser performance of head and neck and spinal sites can be attributed to marginally lower doses and increased high gradient of plans.« less

  15. Strategic Planning: A (Site) Sight-Based Approach to Curriculum and Staff Development.

    ERIC Educational Resources Information Center

    Johnson, Daniel P.

    The purpose of (Colorado's) Clear Creek School District's strategic planning process has been to develop basic district-wide parameters to promote instructional improvement through a process of shared leadership. The approach is termed "sight-based" to indicate the school district's commitment to connecting curriculum and…

  16. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    2007-09-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less

  17. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  18. Experiences with Information Technology Planning in State Government: A Multiple-Site Based Assessment.

    ERIC Educational Resources Information Center

    Byrd, Terry Anthony; And Others

    1992-01-01

    Discusses planning for information technology (IT) in state government and reports on the IT planning experiences of eight state agencies in Florida. Florida's Information Resource Commission is described, the information resources management (IRM) planning process is explained, and recommendations for IRM for other states are given. (20…

  19. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  20. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  1. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  2. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... reimbursement ratio established for such site; or (2) For the uranium site licensees only, $6.25, as adjusted...

  3. Wyoming's industrial siting permit process and environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Hyman, Eric L.

    1982-01-01

    The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.

  4. Acquisition of background and technical information and class trip planning

    NASA Technical Reports Server (NTRS)

    Mackinnon, R. M.; Wake, W. H.

    1981-01-01

    Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.

  5. SU-E-T-760: Tolerance Design for Site-Specific Range in Proton Patient QA Process Using the Six Sigma Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lah, J; Shin, D; Kim, G

    Purpose: To show how tolerance design and tolerancing approaches can be used to predict and improve the site-specific range in patient QA process in implementing the Six Sigma. Methods: In this study, patient QA plans were selected according to 6 site-treatment groups: head &neck (94 cases), spine (76 cases), lung (89 cases), liver (53 cases), pancreas (55 cases), and prostate (121 cases), treated between 2007 and 2013. We evaluated a model of the Six Sigma that determines allowable deviations in design parameters and process variables in patient-specific QA, where possible, tolerance may be loosened, then customized if it necessary tomore » meet the functional requirements. A Six Sigma problem-solving methodology is known as DMAIC phases, which are used stand for: Define a problem or improvement opportunity, Measure process performance, Analyze the process to determine the root causes of poor performance, Improve the process by fixing root causes, Control the improved process to hold the gains. Results: The process capability for patient-specific range QA is 0.65 with only ±1 mm of tolerance criteria. Our results suggested the tolerance level of ±2–3 mm for prostate and liver cases and ±5 mm for lung cases. We found that customized tolerance between calculated and measured range reduce that patient QA plan failure and almost all sites had failure rates less than 1%. The average QA time also improved from 2 hr to less than 1 hr for all including planning and converting process, depth-dose measurement and evaluation. Conclusion: The objective of tolerance design is to achieve optimization beyond that obtained through QA process improvement and statistical analysis function detailing to implement a Six Sigma capable design.« less

  6. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less

  7. Notification: Evaluation of Cherryvale, Kansas National Zinc Company site

    EPA Pesticide Factsheets

    July 12, 2012. The purpose of this memorandum is to notify you that the OIG plans to conduct a review ofthe process followed by EPA Region 7 in the handling of site related contamination at the Cherryvale, Kansas National Zinc Company site.

  8. 30 CFR 285.613 - How will MMS process my SAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false How will MMS process my SAP? 285.613 Section 285.613 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT... CONTINENTAL SHELF Plans and Information Requirements Contents of the Site Assessment Plan § 285.613 How will...

  9. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  10. Spatio-Temporal Process Variability in Watershed Scale Wetland Restoration Planning

    NASA Astrophysics Data System (ADS)

    Evenson, G. R.

    2012-12-01

    Watershed scale restoration decision making processes are increasingly informed by quantitative methodologies providing site-specific restoration recommendations - sometimes referred to as "systematic planning." The more advanced of these methodologies are characterized by a coupling of search algorithms and ecological models to discover restoration plans that optimize environmental outcomes. Yet while these methods have exhibited clear utility as decision support toolsets, they may be critiqued for flawed evaluations of spatio-temporally variable processes fundamental to watershed scale restoration. Hydrologic and non-hydrologic mediated process connectivity along with post-restoration habitat dynamics, for example, are commonly ignored yet known to appreciably affect restoration outcomes. This talk will present a methodology to evaluate such spatio-temporally complex processes in the production of watershed scale wetland restoration plans. Using the Tuscarawas Watershed in Eastern Ohio as a case study, a genetic algorithm will be coupled with the Soil and Water Assessment Tool (SWAT) to reveal optimal wetland restoration plans as measured by their capacity to maximize nutrient reductions. Then, a so-called "graphical" representation of the optimization problem will be implemented in-parallel to promote hydrologic and non-hydrologic mediated connectivity amongst existing wetlands and sites selected for restoration. Further, various search algorithm mechanisms will be discussed as a means of accounting for temporal complexities such as post-restoration habitat dynamics. Finally, generalized patterns of restoration plan optimality will be discussed as an alternative and possibly superior decision support toolset given the complexity and stochastic nature of spatio-temporal process variability.

  11. The Role of Publicly Funded Family Planning Sites In Health Insurance Enrollment.

    PubMed

    Yarger, Jennifer; Daniel, Sara; Biggs, M Antonia; Malvin, Jan; Brindis, Claire D

    2017-06-01

    Publicly funded family planning providers are well positioned to help uninsured individuals learn about health insurance coverage options and effectively navigate the enrollment process. Understanding how these providers are engaged in enrollment assistance and the challenges they face in providing assistance is important for maximizing their role in health insurance outreach and enrollment. In 2014, some 684 sites participating in California's family planning program were surveyed about their involvement in helping clients enroll in health insurance. Weighted univariate and bivariate analyses were conducted to examine enrollment activities and perceived barriers to facilitating enrollment by site characteristics. Most family planning program sites provided eligibility screening (68%), enrollment education (77%), on-site enrollment assistance (55%) and referrals for off-site enrollment support (91%). The proportion of sites offering each type of assistance was highest among community clinics (83-96%), primary care and multispecialty sites (65-95%), Title X-funded sites (72-98%), sites with contracts to provide primary care services (64-93%) and sites using only electronic health records (66-94%). Commonly identified barriers to providing assistance were lack of staff time (reported by 52% of sites), lack of funding (47%), lack of physical space (34%) and lack of staff knowledge (33%); only 20% of sites received funding to support enrollment activities. Although there were significant variations among them, publicly funded family planning providers in California are actively engaged in health insurance enrollment. Supporting their vital role in enrollment could help in the achievement of universal health insurance coverage. Copyright © 2017 by the Guttmacher Institute.

  12. The Challenge of Supporting a Beginning Teacher to Plan in Primary Mathematics

    ERIC Educational Resources Information Center

    Bailey, Judy

    2015-01-01

    Effective lesson planning is a real challenge for many beginning teachers. This paper presents a case study of one such teacher, and the author's efforts to support her in the planning process. Results show supporting the beginning teacher's planning by (a) providing access to resources such as web-sites and teaching handbooks, (b) modelling, and…

  13. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    NASA Astrophysics Data System (ADS)

    McGowan, S. E.; Albertini, F.; Thomas, S. J.; Lomax, A. J.

    2015-04-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties.

  14. PLANNING THE COMMUNITY COLLEGE.

    ERIC Educational Resources Information Center

    1967

    A COMMUNITY COLLEGE MASTER PLAN (1) SHOULD BE UNIQUE, DESIGNED FOR ITS PARTICULAR SITUATION, (2) DEVELOPS FROM AN ANALYSIS OF NEEDS, SITE, GROWTH, AND FINANCE, (3) STARTS WITH A REVIEW OF FACTS, RESOURCES, NEEDS, AND INFLUENCES, TO GIVE A FOUNDATION FOR THE CREATIVE PLANNING PROCESS, AND (4) IS INFLUENCED BY FACTORS OF EDUCATIONAL PROGRAM,…

  15. 76 FR 61360 - Notice of Intent To Prepare an Environmental Impact Statement for the Foreign Affairs Security...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ..., simulation labs, and a fitness center; and support facilities such as administrative offices, dormitories, a dining hall, and emergency response facilities. During the initial planning process, GSA conducted a comprehensive site evaluation process that identified and evaluated 41 candidate sites in the vicinity of the...

  16. Strategic plan for infrastructure optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, C.D.

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less

  17. Draft Site Treatment Plan (DSTP), Volumes I and II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D`Amelio, J.

    1994-08-30

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilitiesmore » is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.« less

  18. Lessons learned from KSC processing on STS science, applications, and commercial payloads

    NASA Technical Reports Server (NTRS)

    Williams, W. E.; Ragusa, J. M.

    1984-01-01

    The present investigation is concerned with an evaluation of the lessons learned in connection with the flights of the Shuttle orbiters Columbia, Challenger, and Discovery. A description is provided of several general and specific lessons related to the processing of free-flying and attached payloads. John F. Kennedy Space Center (KSC), as the prime launch and landing site, is responsible for managing all payload-to-payload, payload-to-simulated orbiter, and payload-to-orbiter operations. For each payload, a KSC Launch Site Support Manager (LSSM) is named as the primary point of contact for the customer. Attention is given to aspects of planning interaction, payload types, and problems of ground processing. The discussed lessons are partly related to the value of early contact between customers and KSC representatives, the primary point of contact, the launch site support plan, and the importance of customer participation.

  19. Reengineering the picture archiving and communication system (PACS) process for digital imaging networks PACS.

    PubMed

    Horton, M C; Lewis, T E; Kinsey, T V

    1999-05-01

    Prior to June 1997, military picture archiving and communications systems (PACS) were planned, procured, and installed with key decisions on the system, equipment, and even funding sources made through a research and development office called Medical Diagnostic Imaging Systems (MDIS). Beginning in June 1997, the Joint Imaging Technology Project Office (JITPO) initiated a collaborative and consultative process for planning and implementing PACS into military treatment facilities through a new Department of Defense (DoD) contract vehicle called digital imaging networks (DIN)-PACS. The JITPO reengineered this process incorporating multiple organizations and politics. The reengineered PACS process administered through the JITPO transformed the decision process and accountability from a single office to a consultative method that increased end-user knowledge, responsibility, and ownership in PACS. The JITPO continues to provide information and services that assist multiple groups and users in rendering PACS planning and implementation decisions. Local site project managers are involved from the outset and this end-user collaboration has made the sometimes difficult transition to PACS an easier and more acceptable process for all involved. Corporately, this process saved DoD sites millions by having PACS plans developed within the government and proposed to vendors second, and then having vendors respond specifically to those plans. The integrity and efficiency of the process have reduced the opportunity for implementing nonstandard systems while sharing resources and reducing wasted government dollars. This presentation will describe the chronology of changes, encountered obstacles, and lessons learned within the reengineering of the PACS process for DIN-PACS.

  20. Remediation plans in family medicine residency

    PubMed Central

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  1. 77 FR 64824 - Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ..., operate, maintain and decommission a maximum 350 megawatt (MW) photovoltaic facility and necessary... for renewable energy development. You may submit comments on issues and planning criteria in writing... considered through the plan amendment process to determine the suitability of the site for renewable energy...

  2. Private sector's role in public school facility planning.

    DOT National Transportation Integrated Search

    2009-03-01

    This report explores the role of private consultants in the school facility planning process. : It focuses on such issues as school siting and local government and school district collaboration. : As such, it seeks to demonstrate the importance of th...

  3. Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Campbell, Sam

    Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burton, J. C.; Environmental Research

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at severalmore » former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling. Data from the various activities are reduced and interpreted each day by the technical staff. Various computer programs are used to visualize and integrate the data. However, people do the data interpretation and integration, not the computers, which are just one more tool at the site. At the end of the day, the staff members meet, review results, and modify the next day's program as necessary to optimize activities that are generating overlapping or confirming site details. Data are not arbitrarily discarded -- each finding must be explained and understood. Anomalous readings may be due to equipment malfunctions, laboratory error, or the inability of a technique to work in a given setting. The suite of selected technologies is adjusted in the field if necessary. (6) The end result of this process is the optimization of the field activity to produce a high-quality technical product that is cost and time effective.« less

  5. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  6. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  7. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  8. 44 CFR 352.20 - Purpose and scope.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... providing Federal technical assistance to the licensee for developing its offsite emergency response plan... response functions which Federal agencies may be called upon to provide; (d) Describes the process for allocating responsibilities among Federal agencies for planning site-specific emergency response functions...

  9. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Ralph

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can findmore » themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)« less

  10. Status of the NASA Micro Pulse Lidar Network (MPLNET): overview of the network and future plans, new version 3 data products, and the polarized MPL

    NASA Astrophysics Data System (ADS)

    Welton, Ellsworth J.; Stewart, Sebastian A.; Lewis, Jasper R.; Belcher, Larry R.; Campbell, James R.; Lolli, Simone

    2018-04-01

    The NASA Micro Pulse Lidar Network (MPLNET) is a global federated network of Micro-Pulse Lidars (MPL) co-located with the NASA Aerosol Robotic Network (AERONET). MPLNET began in 2000, and there are currently 17 long-term sites, numerous field campaigns, and more planned sites on the way. We have developed a new Version 3 processing system including the deployment of polarized MPLs across the network. Here we provide an overview of Version 3, the polarized MPL, and current and future plans.

  11. Planning and conducting a multi-institutional project on fatigue.

    PubMed

    Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E

    1998-09-01

    To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.

  12. Conducting survey research at nursing conferences.

    PubMed

    Sleutel, M R

    2001-01-01

    Conferences can provide large numbers of potential subjects in one location, yet there is little published guidance on how to collect data at a conference site. A computer search revealed no citations on this topic. This article outlines a systematic strategy to plan and perform research at conferences. This article provides a step-by-step process to guide researchers in planning and conducting survey research at conferences. Initial components in planning data collection at a conference include making a timeline and getting permission. Detailed advanced planning involves specific strategies for attracting participants, and for distributing and collecting the questionnaires. Travel provisions and on-site logistical approaches are explained, followed by suggestions for post-conference activities.

  13. Area Community College and Area Vocational School Construction.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Public Instruction, Des Moines.

    The purpose of this guideline is to assist in the planning process, to encourage good school plant design, and to serve as criteria in the evaluation of area community college and area vocational school plans. It is divided into the following five sections--(1) area plant planning, (2) area sites, (3) physical facilities, (4) service systems, and…

  14. 75 FR 30100 - FY 2010 Discretionary Livability Funding Opportunity: Alternatives Analysis Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ..., Alternatives Analysis Program, Office of Planning and Environment, by phone at (202) 493-0512 or by e-mail at... transportation planning process which includes: (1) An assessment of a wide range of public transportation... descriptions of the documents produced, can be found on FTA's Web site at http://www.fta.dot.gov/planning...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Office of Legacy Management (LM) is an integral part of the U.S. Department of Energy’s (DOE’s) strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. LM will work with each site using an integrated team approach to ensure a successful transition. Part of this process will include transition of Government records and information. The Office of Legacy Management Information and Records Management Transition Guidance focuses on LM’s goal to preserve and protect legacy records and information. This guidance document establishes a framework for the transfer ofmore » records management responsibilities for sites transferring to LM. It describes the requirements, responsibilities, and procedures for the efficient and cost-effective transfer of custody, ownership, and management of records and other information products from the transfer site to LM. Records management practices are critical to the functions of Federal agencies because records provide information about, or evidence of, the organization, functions, policies, decisions, procedures, operations, or other activities. Therefore, the information generated by an agency is created, maintained, and dispositioned through records management processes that ensure the appropriate preservation and retrieval of essential information. Because of their intrinsic value, best practices to preserve information and records should be utilized when records are transferred from one organization to another. As the transfer program completes cleanup activities at closure sites, a transitional process will facilitate the transparent shift in the management of site records activities to LM. The roles and responsibilities of the transfer site and/or program and LM described in this document are a necessary foundation for cooperation and coordination and are essential to the successful transition of records and information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.« less

  16. Development of policies for Natura 2000 sites: a multi-criteria approach to support decision makers.

    PubMed

    Cortina, Carla; Boggia, Antonio

    2014-08-01

    The aim of this study is to present a methodology to support decision makers in the choice of Natura 2000 sites needing an appropriate management plan to ensure a sustainable socio-economic development. In order to promote sustainable development in the Natura 2000 sites compatible with nature preservation, conservation measures or management plans are necessary. The main issue is to decide when only conservation measures can be applied and when the sites need an appropriate management plan. We present a case study for the Italian Region of Umbria. The methodology is based on a multi-criteria approach to identify the biodiversity index (BI), and on the development of a human activities index (HAI). By crossing the two indexes for each site on a Cartesian plane, four groups of sites were identified. Each group corresponds to a specific need for an appropriate management plan. Sites in the first group with a high level both of biodiversity and human activities have the most urgent need of an appropriate management plan to ensure sustainable development. The proposed methodology and analysis is replicable in other regions or countries by using the data available for each site in the Natura 2000 standard data form. A multi-criteria analysis is especially suitable for supporting decision makers when they deal with a multidimensional decision process. We found the multi-criteria approach particularly sound in this case, due to the concept of biodiversity itself, which is complex and multidimensional, and to the high number of alternatives (Natura 2000 sites) to be assessed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Comprehensive facilities plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less

  18. 38 CFR 39.26 - Forms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... roads shall be generally 24 feet wide. (4) Pavement design. The pavement section of all roads, service... planning standards. 39.62 Space criteria for support facilities. 39.63 Architectural design standards... this part: (a) Establishment means the process of site selection, land acquisition, design and planning...

  19. HYNOL PROCESS ENGINEERING: PROCESS CONFIGURATION, SITE PLAN, AND EQUIPMENT DESIGN

    EPA Science Inventory

    The report describes the design of the hydropyrolysis reactor system of the Hynol process. (NOTE: A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the Hynol process. The plant is bein...

  20. Level 1 remedial investigation work plan, 300 Area Process Ponds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report discusses the objectives of the site characterization for the 300 Area Process Ponds which are to identify and quantify contamination at the ponds and to estimate their potential impact on human health and the environment. The results of the site characterization will be used to identify any future actions related to contamination at the site and to identify any additional data requirements needed to support selection of a remedial action. 9 refs., 12 figs., 8 tabs.

  1. RCRA/UST, Superfund, and EPCRA hotline training module. Introduction to superfund community involvement. Directive

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This module covers EPA`s Superfund community involvement program, a set of requirements under the National Contingency Plan (NCP) designed to ensure that public is informed about site conditions and given the opportunity to comment on the proposed remedy of a Superfund site. The NCP serves to uphold the public`s right to voice opinions and express concerns about Superfund site activities. EPA must involve communities throughout Superfund process - particularly at critical decision-making steps in the process.

  2. Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CAMPBELL, L.R.

    1999-09-29

    This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.

  3. Risk-based design of process plants with regard to domino effects and land use planning.

    PubMed

    Khakzad, Nima; Reniers, Genserik

    2015-12-15

    Land use planning (LUP) as an effective and crucial safety measure has widely been employed by safety experts and decision makers to mitigate off-site risks posed by major accidents. Accordingly, the concept of LUP in chemical plants has traditionally been considered from two perspectives: (i) land developments around existing chemical plants considering potential off-site risks posed by major accidents and (ii) development of existing chemical plants considering nearby land developments and the level of additional off-site risks the land developments would be exposed to. However, the attempts made to design chemical plants with regard to LUP requirements have been few, most of which have neglected the role of domino effects in risk analysis of major accidents. To overcome the limitations of previous work, first, we developed a Bayesian network methodology to calculate both on-site and off-site risks of major accidents while taking domino effects into account. Second, we combined the results of risk analysis with Analytic Hierarchical Process to design an optimal layout for which the levels of on-site and off-site risks would be minimum. Copyright © 2015 Elsevier B.V. All rights reserved.

  4. Planning riparian restoration in the context of tamarix control in Western North America

    USGS Publications Warehouse

    Shafroth, P.B.; Beauchamp, Vanessa B.; Briggs, M.K.; Lair, K.; Scott, M.L.; Sher, A.A.

    2008-01-01

    Throughout the world, the condition of many riparian ecosystems has declined due to numerous factors, including encroachment of non-native species. In the western United States, millions of dollars are spent annually to control invasions of Tamarix spp., introduced small trees or shrubs from Eurasia that have colonized bottomland ecosystems along many rivers. Resource managers seek to control Tamarix in attempts to meet various objectives, such as increasing water yield and improving wildlife habitat. Often, riparian restoration is an implicit goal, but there has been little emphasis on a process or principles to effectively plan restoration activities, and many Tamarix removal projects are unsuccessful at restoring native vegetation. We propose and summarize the key steps in a planning process aimed at developing effective restoration projects in Tamarix-dominated areas. We discuss in greater detail the biotic and abiotic factors central to the evaluation of potential restoration sites and summarize information about plant communities likely to replace Tamarix under various conditions. Although many projects begin with implementation, which includes the actual removal of Tamarix, we stress the importance of pre-project planning that includes: (1) clearly identifying project goals; (2) developing realistic project objectives based on a detailed evaluation of site conditions; (3) prioritizing and selecting Tamarix control sites with the best chance of ecological recovery; and (4) developing a detailed tactical plan before Tamarix is removed. After removal, monitoring and maintenance as part of an adaptive management approach are crucial for evaluating project success and determining the most effective methods for restoring these challenging sites. ?? 2008 Society for Ecological Restoration International.

  5. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pat Matthews

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less

  6. Negotiating the COAPRT Learning Outcomes Transition Using Quality Management Tools: A Case Study of the COAPRT Beta Test Site

    ERIC Educational Resources Information Center

    Ellis, Gary D.

    2014-01-01

    This paper is a case study. It tells the story of the process that the Council on Accreditation for Parks, Recreation, Tourism and Related Professions beta test site created its learning outcomes assessment program. A planning process was used that has evolved from quality management philosophy and practice: DMADV. Use of DMADV required precise…

  7. The application of consequence models in risk assessment: A regulator`s view

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nussey, C.; Carter, D.A.; Cassidy, K.

    1995-12-31

    Quantified risk assessment (QRA) is a technique for aiding decision making. The UK Health and Safety Executive (HSE) uses QRA in the Major Hazards (MH) area to formulate advice to Local Planning Authorities (LPAs) on the siting of MH installations and the development of land in the vicinity of existing MH installations. The region around UK MH sites within which LPAs are required to consult HSE on land-use planning matters (i.e. the Consultation Distance (CD)) is increasingly being redefined by adopting a risk based approach. The authors are now in the process of conducting or updated site specific QRAs tomore » redefine CDs. This process enables them to identify risk reduction measures and discuss them with companies, taking into consideration the ALARP--as low as is reasonably practicable--philosophy. The paper outlines the basis of the QRAs and the role of consequence assessment models and procedures in this process, and illustrates by examples the setting of CDs and the application of the ALARP philosophy.« less

  8. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastesmore » still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).« less

  9. Data Validation Package - June 2016 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Price, Jeffrey

    This event included annual sampling of groundwater and surface water locations at the Green River, Utah, Disposal Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lrnldownloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). Samples were collected from 15 monitoring wells and two surface locations at the disposal site as specified in the draft 2011 Ground Water Compliance Action Plan for the Green River, Utah, Disposal Site. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0179. Onemore » equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. See Attachment 2, Trip Reports for additional details. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that requires additional action or follow-up.« less

  10. Launch and landing site science processing for ISS utilization

    NASA Astrophysics Data System (ADS)

    Shao, Mimi; van Twest, Jacqueline; van den Ende, Oliver; Gruendel, Douglas; Wells, Deborah; Moyer, Jerry; Heuser, Jan; Etheridge, Guy

    2000-01-01

    Since 1986, Kennedy Space Center (KSC) has provided support to over 500 spaceflight experiments from NASA, international agencies, academic institutions, commercial entities, and the military sector. The experiments cover a variety of science disciplines including molecular, cellular, developmental biology, chemistry, physiology, and material sciences. KSC supports simulation, pre-flight, in-flight, and post-flight processing of flight hardware, specimens, and data at the primary and secondary landing sites. Science processing activities for spaceflight experiments occurs at the Life Science Support Facility (Hangar L) on the Cape Canaveral Air Station (CCAS) and select laboratories in the Industrial Area at KSC. Planning is underway to meet the challenges of the International Space Station (ISS). ISS support activities are expected to exceed the current launch site capability. KSC plans to replace the current facilities with Space Experiments Research and Processing Laboratory (SERPL), a collaborative effort between NASA and the State of Florida. This facility will be the cornerstone of a larger Research Park at KSC and is expected to foster relations between commercial industry and academia in areas related to space research. .

  11. SITE DEMONSTRATION OF THE BASIC EXTRACTIVE SLUDGE TREATMENT PROCESS

    EPA Science Inventory

    The Superfund Innovative Technology Evaluation (SITE) Program, in cooperation with EPA Region 5, the Great Lakes National Program Office (GLNPO), and the U.S. Army Corps of Engineers (COE) planned and executed a pilot-scla e evaluation of the Basic Extyractive Sludge Treatment (B...

  12. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors andmore » associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.« less

  13. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  14. Implementation of advanced LCNG fueling infrastructure in Texas along the I-35/NAFTA Clean Corridor Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Stan; Hightower, Jared; Knight, Koby

    This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.

  15. DATA QUALITY OBJECTIVES-FOUNDATION OF A SUCCESSFUL MONITORING PROGRAM

    EPA Science Inventory

    The data quality objectives (DQO) process is a fundamental site characterization tool and the foundation of a successful monitoring program. The DQO process is a systematic planning approach based on the scientific method of inquiry. The process identifies the goals of data col...

  16. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feng, W.

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  17. MO-B-BRB-00: Optimizing the Treatment Planning Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  18. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kapur, A.

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  19. Building dismantlement and site remediation at the Apollo Fuel Plant: When is technology the answer?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walton, L.

    1995-01-01

    The Apollo fuel plant was located in Pennsylvania on a site known to have been used continuously for stell production from before the Civil War until after World War II. Then the site became a nuclear fuel chemical processing plants. Finally it was used to convert uranium hexafluoride to various oxide fuel forms. After the fuel manufacturing operations were teminated, the processing equipment was partially decontaminated, removed, packaged and shipped to a licensed low-level radioactive waste burial site. The work was completed in 1984. In 1990 a detailed site characterization was initiated to establishe the extent of contamination and tomore » plan the building dismantlement and soil remediation efforts. This article discusses the site characterization and remedial action at the site in the following subsections: characterization; criticality control; mobile containment; soil washing; in-process measurements; and the final outcome of the project.« less

  20. Chapter 3: Design of the Saber-Tooth Project.

    ERIC Educational Resources Information Center

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  1. Temporary disaster debris management site identification using binomial cluster analysis and GIS.

    PubMed

    Grzeda, Stanislaw; Mazzuchi, Thomas A; Sarkani, Shahram

    2014-04-01

    An essential component of disaster planning and preparation is the identification and selection of temporary disaster debris management sites (DMS). However, since DMS identification is a complex process involving numerous variable constraints, many regional, county and municipal jurisdictions initiate this process during the post-disaster response and recovery phases, typically a period of severely stressed resources. Hence, a pre-disaster approach in identifying the most likely sites based on the number of locational constraints would significantly contribute to disaster debris management planning. As disasters vary in their nature, location and extent, an effective approach must facilitate scalability, flexibility and adaptability to variable local requirements, while also being generalisable to other regions and geographical extents. This study demonstrates the use of binomial cluster analysis in potential DMS identification in a case study conducted in Hamilton County, Indiana. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  2. Analytic hierarchy process-based approach for selecting a Pareto-optimal solution of a multi-objective, multi-site supply-chain planning problem

    NASA Astrophysics Data System (ADS)

    Ayadi, Omar; Felfel, Houssem; Masmoudi, Faouzi

    2017-07-01

    The current manufacturing environment has changed from traditional single-plant to multi-site supply chain where multiple plants are serving customer demands. In this article, a tactical multi-objective, multi-period, multi-product, multi-site supply-chain planning problem is proposed. A corresponding optimization model aiming to simultaneously minimize the total cost, maximize product quality and maximize the customer satisfaction demand level is developed. The proposed solution approach yields to a front of Pareto-optimal solutions that represents the trade-offs among the different objectives. Subsequently, the analytic hierarchy process method is applied to select the best Pareto-optimal solution according to the preferences of the decision maker. The robustness of the solutions and the proposed approach are discussed based on a sensitivity analysis and an application to a real case from the textile and apparel industry.

  3. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    NASA Astrophysics Data System (ADS)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  4. Strategic planning: the basics and benefits.

    PubMed

    Hansen, R D

    1999-01-01

    Strategic planning can help a medical practice take an honest look at itself in light of the changes taking place in its environment and within the practice itself. The objective is for the group to design a plan, or road map, to its envisioned future. For medical practices, strategic planning is a four part process: 1) gaining buy-in for the process itself from the leadership and physicians; 2) gathering pertinent data about the group's environment through external resources, and about the group itself through interviews and surveys of physicians; 3) conducting a facilitated off-site retreat of key physicians and leaders in order to review data, discuss issues and develop a one to two year action plan; and, 4) carrying out the action plan developed at the retreat and measuring its outcomes. A follow-up mini-retreat about six months after the first retreat is highly recommended, as is instituting a process of sharing of the results and outcomes of the plan with all members of the organization.

  5. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, J.

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequentialmore » events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi-automatic plan evaluation, (e) quality checklist for error prevention, (f) iterative process, (g) balance of speed and quality Learning Objectives: Gain familiarity with the workflow of modern treatment planning process. Understand the scope and challenges of managing modern treatment planning processes. Gain familiarity with Lean Six Sigma approaches and their implementation in the treatment planning workflow.« less

  6. Analyses of Rock Size-Frequency Distributions and Morphometry of Modified Hawaiian Lava Flows: Implications for Future Martian Landing Sites

    NASA Technical Reports Server (NTRS)

    Craddock, Robert A.; Golombek, Matthew; Howard, Alan D.

    2000-01-01

    Both the size-frequency distribution and morphometry of rock populations emplaced by a variety of geologic processes in Hawaii indicate that such information may be useful in planning future landing sites on Mars and interpreting the surface geology.

  7. 78 FR 44455 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... Sonoma County, California. The Site's main property contains a manufacturing building and adjoining... corner of the manufacturing facility. The Site building is currently occupied by three companies, which.... Sola manufactured ophthalmic lenses at the facility from 1978 through 2001. The manufacturing process...

  8. Effectiveness of participatory planning for community management of fisheries in Bangladesh.

    PubMed

    Sultana, Parvin; Abeyasekera, Savitri

    2008-01-01

    This study provides statistical evidence that support for community-based management of resources was more effective when initiated through a process known as participatory action plan development (PAPD). Thirty-six sites were studied where community management of fisheries was facilitated by NGOs. All involved community participation and establishing local fisheries management institutions. However, communities were able to take up more conservation-related interventions and faced fewer conflicts in the 18 sites where a PAPD was the basis for collective action and institution development. This indicates the value and effectiveness of adopting good practice in participatory planning, such as PAPD, which helps diverse stakeholders find common problems and solutions for natural resource management.

  9. Site Selection for the Disposal of LLW in Taiwan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chuang, W.S.; Chi, L.M.; Tien, N.C.

    2006-07-01

    This paper presents the implementation status of the low-level radioactive waste (LLW) disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes and preliminary disposal concepts. The first phase of site selection for low-level radioactive waste final disposal in Taiwan was implemented between 1992 and 2002. The site selection process adopted a Geographic Information System (GIS), Hierarchical Analysis System, Expert Evaluation System, and site reconnaissance. An incentive program for voluntary sites was also initiated. After a series of evaluations and discussion of 30 potentialmore » candidate sites, including 8 recommended sites, 5 qualified voluntary townships, and several remote uninhabited small islets, Hsiao-chiou islet was selected as the first priority candidate site in February 1998. The geological investigation work in Hsiao-chiou was conducted from March 1999 through October 2000. An Environmental Impact Statement Report (EIS) and the Investment Feasibility Study Report (IFS) were submitted to the Environmental Protection Agency (EPA) in November 2000 and to the Ministry of Economic Affairs (MOEA) in June 2001, respectively. Unfortunately, the site investigation was discontinued in 2002 due to political and public acceptance consideration. After years of planning, the second phase of the site selection process was launched in August 2004 and will be conducted through 2008. It is planned that a repository will be constructed in early 2009 and start to operate in 2014. The site selection process for the second phase is based on the earlier work and four potential candidate sites were selected for evaluation until 2005. A near surface disposal concept is proposed for a site located in the Taiwan strait, and cavern disposal concepts are proposed for three other sites located on the main island. This paper presents the implementation status of the LLW disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes, and preliminary disposal concepts 'NIMBY' (Not in my backyard) is a critical problem for implementation of the final disposal project. Resistance from local communities has been continuously received during site characterization. To overcome this, an incentive program to encourage community acceptance has been approved by the Government. Programs for community promotion are being proposed and negotiations are also underway. (authors)« less

  10. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunkermore » currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less

  11. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currentlymore » stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less

  12. SWiFT Software Quality Assurance Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, Jonathan Charles

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  13. CINRG: Infrastructure for Clinical Trials in Duchenne Dystrophy

    DTIC Science & Technology

    2013-09-01

    research centers sharing a common goal of improving the quality of life of neuromuscular disease patients by cooperative planning , implementation, analysis...discrepancies were noted surrounding the regulatory binder, consent process and data records. The site personnel have a scheduled plan with the CINRG CC...missing long term follow-up visits). The project manager also reviewed the study records to date while onsite. A high priority plan was developed with the

  14. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less

  15. Site Development, Operations, and Closure Plan Topical Report 5 An Assessment of Geologic Carbon Sequestration Options in the Illinois Basin. Phase III

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finley, Robert; Payne, William; Kirksey, Jim

    2015-06-01

    The Midwest Geological Sequestration Consortium (MGSC) has partnered with Archer Daniels Midland Company (ADM) and Schlumberger Carbon Services to conduct a large-volume, saline reservoir storage project at ADM’s agricultural products processing complex in Decatur, Illinois. The Development Phase project, named the Illinois Basin Decatur Project (IBDP) involves the injection of 1 million tonnes of carbon dioxide (CO 2) into a deep saline formation of the Illinois Basin over a three-year period. This report focuses on objectives, execution, and lessons learned/unanticipated results from the site development (relating specifically to surface equipment), operations, and the site closure plan.

  16. Tolerance design of patient-specific range QA using the DMAIC framework in proton therapy.

    PubMed

    Rah, Jeong-Eun; Shin, Dongho; Manger, Ryan P; Kim, Tae Hyun; Oh, Do Hoon; Kim, Dae Yong; Kim, Gwe-Ya

    2018-02-01

    To implement the DMAIC (Define-Measure-Analyze-Improve-Control) can be used for customizing the patient-specific QA by designing site-specific range tolerances. The DMAIC framework (process flow diagram, cause and effect, Pareto chart, control chart, and capability analysis) were utilized to determine the steps that need focus for improving the patient-specific QA. The patient-specific range QA plans were selected according to seven treatment site groups, a total of 1437 cases. The process capability index, C pm was used to guide the tolerance design of patient site-specific range. For prostate field, our results suggested that the patient range measurements were capable at the current tolerance level of ±1 mm in clinical proton plans. For other site-specific ranges, we analyzed that the tolerance tends to be overdesigned to insufficient process capability calculated by the patient-specific QA data. The customized tolerances were calculated for treatment sites. Control charts were constructed to simulate the patient QA time before and after the new tolerances were implemented. It is found that the total simulation QA time was decreased on average of approximately 20% after establishing new site-specific range tolerances. We simulated the financial impact of this project. The QA failure for whole process in proton therapy would lead up to approximately 30% increase in total cost. DMAIC framework can be used to provide an effective QA by setting customized tolerances. When tolerance design is customized, the quality is reasonably balanced with time and cost demands. © 2017 American Association of Physicists in Medicine.

  17. Integrating expert knowledge in a GIS to optimize siting decisions for small-scale healthy food retail interventions.

    PubMed

    Sadler, Richard Casey

    2016-06-16

    The availability of healthy foods in a neighborhood remains a key determinant of diet and diet-related disease in disadvantaged communities. Innovative solutions to the 'food desert' problem include the deployment of mobile markets and healthy corner store initiatives. Such initiatives, however, do not always capitalize on the principles guiding retail development and the possibilities of GIS-based data. Simultaneously, community partners are not always engaged effectively in the planning for such interventions, which limits acceptability and suitability of such work. This paper highlights the results of a participatory mapping exercise to optimize the siting of a planned healthy food retail intervention in Flint, Michigan. Potential sites are chosen by engaging experts in a three-stage mapping process that includes the analytic hierarchy process and point allocation of five key variables (including food access, socioeconomic distress, population density, access to transit, and proximity to neighborhood centers), as well as direct mapping of suitable sites. Results suggest a discrete set of areas-primarily in the northwestern quadrant of the city-where small-scale healthy food retail interventions might be most strategically located. Areas with the most consistent overlap between directly mapped sites and very high levels of suitability align well with neighborhoods which are distant from existing grocery stores. As a community-based strategy, this increases the opportunity for effectively improving neighborhood access to healthy foods by optimizing the potential sites for healthy food interventions. Community partners have already been active in using these results in project planning for just such an intervention.

  18. Do PEV Drivers Park Near Publicly Accessible EVSE in San Diego but Not Use Them?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Francfort, James Edward

    The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included EVSE installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where significant PEV traffic and parking was expected. This planning process is described in The Micro-Climate deployment Process in San Diego1. The EV Project issued its deployment planmore » for San Diego in November 2010, prior to the sale of PEVs by Nissan and Chevrolet. The Project deployed residential EVSE concurrent with vehicle delivery starting in December 2010. The installation of non-residential EVSE commenced in April 2011 consistent with the original Project schedule, closely following the adoption of PEVs. The residential participation portion of The EV Project was fully subscribed by January 2013 and the non-residential EVSE deployment was essentially completed by August 2013.« less

  19. Multiple criteria approach to site selection of radioactive waste disposal facility in the Republic of Croatia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schaller, A.; Skanata, D.

    1995-12-31

    Site selection approach to radioactive waste disposal facility, which is under way in Croatia, is presented in the paper. This approach is based on application of certain relevant terrestrial and technical criteria in the site selection process. Basic documentation used for this purpose are regional planning documents prepared by the Regional Planning Institute of Croatia. The basic result of research described in the paper is the proposal of several potential areas which are suitable for siting a radioactive waste repository. All relevant conclusions are based on both data groups -- generic and on-field experienced (measured). Out of a dozen potentialmore » areas, four have been chosen as representative by the authors. The presented comparative analysis was made by means of the VISA II computer code, developed by the V. Belton and SPV Software Products. The code was donated to the APO by the IAEA. The main objective of the paper is to initiate and facilitate further discussions on possible ways of evaluation and comparison of potential areas for sitting of radioactive waste repository in this country, as well as to provide additional contributions to the current site selection process in the Republic of Croatia.« less

  20. Data Validation Package May 2016 Groundwater Sampling at the Lakeview, Oregon, Processing Site August 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Hall, Steve

    2016-08-01

    This biennial event includes sampling five groundwater locations (four monitoring wells and one domestic well) at the Lakeview, Oregon, Processing Site. For this event, the domestic well (location 0543) could not be sampled because no one was in residence during the sampling event (Note: notification was provided to the resident prior to the event). Per Appendix A of the Groundwater Compliance Action Plan, sampling is conducted to monitor groundwater quality on a voluntary basis. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated).more » One duplicate sample was collected from location 0505. Water levels were measured at each sampled monitoring well. The constituents monitored at the Lakeview site are manganese and sulfate. Monitoring locations that exceeded the U.S. Environmental Protection Agency (EPA) Secondary Maximum Contaminant Levels for these constituents are listed in Table 1. Review of time-concentration graphs included in this report indicate that manganese and sulfate concentrations are consistent with historical measurements.« less

  1. Revised ground-water monitoring compliance plan for the 300 area process trenches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less

  2. Nonterrestrial material processing and manufacturing of large space systems

    NASA Technical Reports Server (NTRS)

    Vontiesenhausen, G. F.

    1978-01-01

    An attempt is made to provide pertinent and readily usable information on the extraterrestrial processing of materials and manufacturing of components and elements of these planned large space systems from preprocessed lunar materials which are made available at a processing and manufacturing site in space. Required facilities, equipment, machinery, energy and manpower are defined.

  3. 30 CFR 285.613 - How will MMS process my SAP?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false How will MMS process my SAP? 285.613 Section 285.613 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE... Requirements Contents of the Site Assessment Plan § 285.613 How will MMS process my SAP? (a) The MMS will...

  4. LANDSAT demonstration/application and GIS integration in south central Alaska

    NASA Technical Reports Server (NTRS)

    Burns, A. W.; Derrenbacher, W.

    1981-01-01

    Automated geographic information systems were developed for two sites in Southcentral Alaska to serve as tests for both the process of integrating classified LANDSAT data into a comprehensive environmental data base and the process of using automated information in land capability/suitability analysis and environmental planning. The Big Lake test site, located approximately 20 miles north of the City of Anchorage, comprises an area of approximately 150 square miles. The Anchorage Hillside test site, lying approximately 5 miles southeast of the central part of the city, extends over an area of some 25 square miles. Map construction and content is described.

  5. 76 FR 54747 - Proposed Agency Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... processes, available financing options, and planning and zoning issues as they relate to rooftop solar PV... information on solar energy market indicators. The Solar Energy Technologies Program (SETP) seeks to reduce non-hardware costs of solar systems associated with processes such as project siting, permitting and...

  6. Engineering design and test plan for demonstrating DETOX treatment of mixed wastes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldblatt, S.; Dhooge, P.

    1995-03-01

    DETOX is a cocatalyzed wet oxidation process in which the catalysts are a relatively great concentration of iron ions (typically as iron(III) chloride) in the presence of small amounts of platinum and ruthenium ions. Organic compounds are oxidized completely to carbon dioxide, water, and (if chlorinated) hydrogen chloride. The process has shown promise as a non-thermal alternative to incineration for treatment and/or volume reduction of hazardous, radioactive, and mixed wastes. Design and fabrication of a demonstration unit capable of destroying 25. Kg/hr of organic material is now in progress. This paper describes the Title 2 design of the demonstration unit,more » and the planned demonstration effort at Savannah River Site (SRS) and Weldon Spring Site Remedial Action Project (WSSRAP).« less

  7. Strategic facility planning improves capital decision making.

    PubMed

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  8. Environmental sciences information storage and retrieval system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engstrom, D.E.; White, M.G.; Dunaway, P.B.

    Reynolds Electrical and Engineering Co., Inc. (REECo), has since 1970 accumulated information relating to the AEC's Nevada Applied Ecology Group (NAEG) programs at the Nevada Test Site (NTS). These programs, involving extensive soil, vegetation, and small-animal studies, have generated informational data concerning the collecting, processing, analyzing, and shipping of sample materials to various program participants and contractors. Future plans include incorporation of Lawrence Livermore Laboratory's resuspension study data, REECo's on-site air data, and EPA's large-animal, off-site air, and off-site soil data. (auth)

  9. Computer-assisted selection of donor sites for autologous grafts

    NASA Astrophysics Data System (ADS)

    Krol, Zdzislaw; Zeilhofer, Hans-Florian U.; Sader, Robert; Hoffmann, Karl-Heinz; Gerhardt, Paul; Horch, Hans-Henning

    1997-05-01

    A new method is proposed for a precise planning of autologous bone grafts in cranio- and maxillofacial surgery. In patients with defects of the facial skeleton, autologous bone transplants can be harvested from various donor sites in the body. The preselection of a donor site depends i.a. on the morphological fit of the available bone mass and the shape of the part that is to be transplanted. A thorough planning and simulation of the surgical intervention based on 3D CT studies leads to a geometrical description and the volumetric characterization of the bone part to be resected and transplanted. Both, an optimal fit and a minimal lesion of the donor site are guidelines in this process. We use surface similarity and voxel similarity measures in order to select the optimal donor region for an individually designed transplant.

  10. Quality-assurance plan for groundwater activities, U.S. Geological Survey, Washington Water Science Center

    USGS Publications Warehouse

    Kozar, Mark D.; Kahle, Sue C.

    2013-01-01

    This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.

  11. Row erupts over US firm's plan to import nuclear waste

    NASA Astrophysics Data System (ADS)

    Gwynne, Peter

    2008-06-01

    A controversy is brewing in the US over a plan by a firm in Utah to import, process and dispose of 20 000 tonnes of low-level radioactive waste from decommissioned nuclear reactors built in Italy by American companies. EnergySolutions intends to recycle some of this waste at a site near Oak Ridge, Tennessee, so that it can be re-used as shielding blocks in nuclear plants. The firm then wants to dispose of the remaining radioactive material at a site in Clive, Utah, where over 90% of low-level radioactive waste generated in the US is currently buried.

  12. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.

  13. Use of strategic environmental assessment in the site selection process for a radioactive waste disposal facility in Slovenia.

    PubMed

    Dermol, Urška; Kontić, Branko

    2011-01-01

    The benefits of strategic environmental considerations in the process of siting a repository for low- and intermediate-level radioactive waste (LILW) are presented. The benefits have been explored by analyzing differences between the two site selection processes. One is a so-called official site selection process, which is implemented by the Agency for radwaste management (ARAO); the other is an optimization process suggested by experts working in the area of environmental impact assessment (EIA) and land-use (spatial) planning. The criteria on which the comparison of the results of the two site selection processes has been based are spatial organization, environmental impact, safety in terms of potential exposure of the population to radioactivity released from the repository, and feasibility of the repository from the technical, financial/economic and social point of view (the latter relates to consent by the local community for siting the repository). The site selection processes have been compared with the support of the decision expert system named DEX. The results of the comparison indicate that the sites selected by ARAO meet fewer suitability criteria than those identified by applying strategic environmental considerations in the framework of the optimization process. This result stands when taking into account spatial, environmental, safety and technical feasibility points of view. Acceptability of a site by a local community could not have been tested, since the formal site selection process has not yet been concluded; this remains as an uncertain and open point of the comparison. Copyright © 2010 Elsevier Ltd. All rights reserved.

  14. Heritage planning and rethinking the meaning and values of designating heritage sites in a post-disaster context: The case of Aceh, Indonesia

    NASA Astrophysics Data System (ADS)

    Meutia, Z. D.; Akbar, R.; Zulkaidi, D.

    2018-05-01

    Heritage has become a driver of development as stated in the New Urban Agenda 2016 report. A starting premise of most recent studies of the concept of heritage suggests that its nature is not as a static inheritance with fixed and enduring values. Rather, the identification of sites as heritage requires a process of identification, or heritage creation. Heritage is a fluid phenomenon rather than a static set of objects or sites with fixed meanings. This paper uses theory from Smith [1] who argued that there is no such thing as a heritage; heritage is essentially a cultural custom and social process. Today, site-based heritage planning only considers the values of old towns and lacks clarity in terms of values that create criteria for the designation of cultural heritage sites in another context. Yet, this approach is needed as a way to maintain urban assets that significantly contribute to the establishment of values and quality parts of the city. Heritage planning is also the act of communicating and remembering the past for the present and the future in the public domain. This paper aims to formulate a conceptual heritage planning of designating heritage sites that challenges the traditional notion of heritage which considers age as a key element in heritage, the privileges monumentality and grand scale, with scientific/aesthetic expert judgment as a requirement of heritage designations. The limited idea of heritage based on exclusive values as something ancient, grand-scale, historical, and with other exclusive values has excluded many places as heritage in communities emerging from disasters. Debates within the critical heritage studies movement argue that heritage is a cultural product linked to activities of remembering and is an act of communication. The dominant hypothesis is that heritage values cannot remain to exist if the physical or material aspects of sites are destroyed and this hypothesis feels flawed. This paper asks us to acknowledge the importance of understanding how local values create heritage, that heritage is not only about material and physical aspects but it is also a cultural process. The methodology used is ethnography with in-depth interviews to uncover meaning and values in this context. This paper uses the examples of how the sites in Aceh that were affected by the tsunami disaster in 2004 such as the PLTD Apung ship and the Mosque of Ulee Lheue are sites that a mutual and role of historical city relating to the potential as signs of civilization, historical values, commemorative values, religious values, and values of consensus within the community as outstanding local values, as a basis of consideration in rethinking the designations of heritage sites of less than 50 years old.

  15. Lessons Learned.

    ERIC Educational Resources Information Center

    Hassell, Kim Dale

    2000-01-01

    Discusses the common mistakes in school design and construction and how to avoid them. Mistake avoidance in mastering planning, site acquisition, drawing changes, budgeting, school design process, construction management, and the architect's role are highlighted. (GR)

  16. Pre-movement planning processes in people with congenital mirror movements.

    PubMed

    Franz, E A; Fu, Y

    2017-10-01

    Pre-movement processes were investigated in people with Congenital mirrormovement (CMM), a rare disorder in which bilateral movement (mirroring) occurs in the upper distal extremities (primarily the hands and fingers) during intended unilateral movements. Abnormal density of ipsilateral corticospinal projections is an established hallmark of CMM. This study tested whether the Lateralised Readiness Potential (LRP), which reflects movement planning and readiness, is also abnormal in people with CMM. Twenty-eight neurologically-normal controls and 8 people with CMM were tested on a unimanual Go/No-go task while electroencephalography (EEG) was recorded to assess the LRP. No significant group differences were found in reaction time (RT). However, significantly smaller LRP amplitudes were found, on average, in the CMM group compared to Controls at central-motor (C3,C4) sites in stimulus-locked and response-locked epochs; similar group differences were also found at further frontal sites (F3,F4) during response-locked epochs. Abnormal brain activity in pre-movement processes associated with response planning and preparation is present in people with CMM. Aberrant bilateral activity during pre-movement processes is clearly implicated; whether part of the etiology of CMM, or as a mechanism of neuro-compensation, is not yet known. Copyright © 2017 International Federation of Clinical Neurophysiology. Published by Elsevier B.V. All rights reserved.

  17. Transition and Transfer of Remediated Formerly Utilized Sites Remedial Action Program (FUSRAP) Sites from U.S. Army Corps of Engineers (USACE) to U.S. Department of Energy (DOE)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, Cliff; Castillo, Darina; Fatherly, Nicki

    The US Department of Energy (DOE) expects to receive the transfer of 10 FUSRAP Sites from the US Army Corps of Engineers (USACE) over the next 10 years; however, the timing of the transfers is highly dependent upon federal funding of the ongoing remedial actions. When remediation for each site is complete and the 2-year operations and maintenance period has concluded, each site will transfer from USACE to DOE for long-term surveillance and maintenance (LTS&M). US DOE’s Office of Legacy Management (LM) will accept program responsibility for these sites and conduct LTS&M activities required to maintain protectiveness, preserve site-specific knowledge,more » and retain the cleanup and stewardship records while keeping stakeholders informed. Since the last FUSRAP site transfer occurred in 2007, LM in coordination with USACE intends to establish a transition process to promote the seamless transfer of sites from the time when the first record of decision is signed to the completion of FUSRAP activities. The approach to transfer active FUSRAP sites to completed sites status has been historically outlined in foundational documents such as the 1999 Memorandum of Understanding and supporting letters of agreement between the two agencies. As more complex FUSRAP sites are completed, this transition process will provide a model between the two agencies to communicate future long-term care liabilities. Ultimately, the FUSRAP transition process is structured to acquire and preserve site knowledge and information necessary for protecting the environment and public health. As of 2015, LM has transitioned and accepted programmatic responsibility for over 90 sites. From LM’s perspective, successful transition of any site includes understanding the long-term environmental liabilities. LM uses site transition framework requirements from past transitions to develop site-specific transition plans. Site-specific transition plans are developed by LM in coordination with USACE and executed during the 2-year operations and maintenance period. An integrated project team of subject matter experts is assembled to address the conditions of the transitioning site; acquire a site records collection; evaluate site operations and final site conditions and associated risks; identify and contact stakeholders; and document the basis for site LTS&M requirements. While the majority of the transition activities are completed by LM, close coordination between US DOE LM and USACE throughout this process is essential for an effective and seamless transfer to assure that there is no lapse in site protectiveness.« less

  18. Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uhlmeyer, Terri; Thompson, Randy; Starr, Ken

    2013-07-01

    The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws,more » Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)« less

  19. statement of significance, location map, site plan, landscape plan, site ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    statement of significance, location map, site plan, landscape plan, site sections, evolution of cemetery landscape. - San Francisco National Cemetery, 1 Lincoln Boulevard, San Francisco, San Francisco County, CA

  20. Waste processing building with incineration technology

    NASA Astrophysics Data System (ADS)

    Wasilah, Wasilah; Zaldi Suradin, Muh.

    2017-12-01

    In Indonesia, waste problem is one of major problem of the society in the city as part of their life dynamics. Based on Regional Medium Term Development Plan of South Sulawesi Province in 2013-2018, total volume and waste production from Makassar City, Maros, Gowa, and Takalar Regency estimates the garbage dump level 9,076.949 m3/person/day. Additionally, aim of this design is to present a recommendation on waste processing facility design that would accommodate waste processing process activity by incineration technology and supported by supporting activity such as place of education and research on waste, and the administration activity on waste processing facility. Implementation of incineration technology would reduce waste volume up to 90% followed by relative negative impact possibility. The result planning is in form of landscape layout that inspired from the observation analysis of satellite image line pattern of planning site and then created as a building site pattern. Consideration of building orientation conducted by wind analysis process and sun path by auto desk project Vasari software. The footprint designed by separate circulation system between waste management facility interest and the social visiting activity in order to minimize the croos and thus bring convenient to the building user. Building mass designed by inseparable connection series system, from the main building that located in the Northward, then connected to a centre visitor area lengthways, and walked to the waste processing area into the residue area in the Southward area.

  1. Climate Change Resilience Planning at the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.; Johnson, A.

    2015-12-01

    The Savannah River National Laboratory (SRNL) is developing a site sustainability plan for the Department of Energy's Savannah River Site (SRS) in South Carolina in accordance with Executive Order 13693, which charges each DOE agency with "identifying and addressing projected impacts of climate change" and "calculating the potential cost and risk to mission associated with agency operations". The plan will comprise i) projections of climate change, ii) surveys of site managers to estimate the effects of climate change on site operations, and iii) a determination of adaptive actions. Climate change projections for SRS are obtained from multiple sources, including an online repository of downscaled global climate model (GCM) simulations of future climate and downscaled GCM simulations produced at SRNL. Taken together, we have projected data for temperature, precipitation, humidity, and wind - all variables with a strong influence on site operations. SRNL is working to engage site facility managers and facilitate a "bottom up" approach to climate change resilience planning, where the needs and priorities of stakeholders are addressed throughout the process. We make use of the Vulnerability Assessment Scoring Tool, an Excel-based program designed to accept as input various climate scenarios ('exposure'), the susceptibility of assets to climate change ('sensitivity'), and the ability of these assets to cope with climate change ('adaptive capacity'). These are combined to produce a series of scores that highlight vulnerabilities. Working with site managers, we have selected the most important assets, estimated their expected response to climate change, and prepared a report highlighting the most endangered facilities. Primary risks include increased energy consumption, decreased water availability, increased forest fire danger, natural resource degradation, and compromised outdoor worker safety in a warmer and more humid climate. Results of this study will aid in driving future management decisions and promoting sustainable practices at SRS.

  2. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  3. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  4. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  5. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  6. Enhanced human service transportation models : joint demonstration. Phase 1, System planning and design process evaluation : baseline analysis

    DOT National Transportation Integrated Search

    2007-11-13

    This document presents the findings from the baseline phase of the evaluation of the process being used by eight sites to develop a design for a Travel Management Coordination Center (TMCC) for improved coordination of human service transportation wi...

  7. Rationale, design, and methods for process evaluation in the Childhood Obesity Research Demonstration project

    USDA-ARS?s Scientific Manuscript database

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding peri...

  8. Problems Related to the Siting of the Laboratory Building for Civil Engineering Department at the University of Warmia and Mazury in Olsztyn, Poland

    NASA Astrophysics Data System (ADS)

    Zagroba, Marek

    2016-10-01

    This paper deals with the conditions underlying and the problems arising from the siting of a building with specialist laboratories in a developed part of the university campus in Olsztyn, Poland. The topography of the terrain and the need to house civil engineering laboratories in the planned building had an immense impact on the shape of the building and consequently on its foundations, whose dimensions responded to the ground conditions and the specification of various loads they would have to support, including the equipment for the laboratories. The siting of a building as a step in the construction process entails several problems, which are first taken into consideration at the stage of making preliminary concept plans and are subsequently verified while working on the final construction plan. The required information included geotechnical documentation, survey of the ground conditions and the data regarding the predicted loads on the building, necessary to select the right type of foundations. All these problems grow in importance when dealing with such unique buildings like the discussed example of a laboratory building for the Civil Engineering Department, built on a site within a conservation zone on the campus of the University of Warmia and Mazury in Olsztyn, Poland. The specific character of the building and the specialist equipment with which it was to be furnished (a resistance testing machine, a 17-meter-long wave flume) necessitated a series of analyses prior to the siting of the building and selecting suitable foundations. In turn, the fact that the new building was to be erected in the conservation zone meant that collaboration with the Heritage Conservation Office had to be undertaken at the stage of making the plan and continued during the construction works. The Heritage Officer's recommendations concerning the building's shape, divisions, dimensions, materials used, etc., created a situation where the team of designers and architects had to become engaged in the process of landscape and spatial management. The above requirements concerned the functions of the building and its siting on a land parcel that was difficult to handle, also because of the protected trees growing there. Other constraints included the small size of this site, the developed surroundings, and the pre-defined programme of functions and use of the new building. On the other hand, the siting of the planned building had to be accommodated to the existing underground infrastructure (utilities). All the above circumstances made the task difficult and demanded good coordination between individual teams of engineers and architects, both at the stage of making the plan and during the construction works.

  9. Cultural Resources Reconnaissance Along the Cheyenne River Arm of Lake Oahe in Dewey, Haakon, Stanley, and Ziebach Counties, South Dakota. Volume 1. Main Report

    DTIC Science & Technology

    1988-03-01

    of site 39ST282................................227 39 Plan of site 39ST283................................230 40 Detailed plans of Features 1 and 2...268 53 Plan of site 39DW64 .............................. 272 54 Plan of Feature 1, site 39DW64 ................... 273 55 Plan of site 39DW65...facing E ........................... 228 46 Site 39ST283, facing NE .......................... 232 47 Detail of Feature 1, site 39ST283, facing NW

  10. Operations planning simulation model extension study. Volume 1: Long duration exposure facility ST-01-A automated payload

    NASA Technical Reports Server (NTRS)

    Marks, D. A.; Gendiellee, R. E.; Kelly, T. M.; Giovannello, M. A.

    1974-01-01

    Ground processing and operation activities for selected automated and sortie payloads are evaluated. Functional flow activities are expanded to identify payload launch site facility and support requirements. Payload definitions are analyzed from the launch site ground processing viewpoint and then processed through the expanded functional flow activities. The requirements generated from the evaluation are compared with those contained in the data sheets. The following payloads were included in the evaluation: Long Duration Exposure Facility; Life Sciences Shuttle Laboratory; Biomedical Experiments Scientific Satellite; Dedicated Solar Sortie Mission; Magnetic Spectrometer; and Mariner Jupiter Orbiter. The expanded functional flow activities and descriptions for the automated and sortie payloads at the launch site are presented.

  11. Is an advance care planning model feasible in community palliative care? A multi-site action research approach.

    PubMed

    Blackford, Jeanine; Street, Annette

    2012-09-01

    This article reports a study to determine the feasibility of an advance care planning model developed with Australian community palliative care services. An effective advance care planning programme involves an organizational wide commitment and preparedness for health service reform to embed advance care planning into routine practice. Internationally, such programmes have been implemented predominantly in aged and acute care with more recent work in primary care. A multi-site action research was conducted over a 16-month period in 2007-2009 with three Victorian community palliative care services. Using mixed method data collection strategies to assess feasibility, we conducted a baseline audit of staff and clients; analysed relevant documents (client records, policies, procedures and quality improvement strategies) pre-implementation and post-implementation and conducted key informant interviews (n = 9). Three community palliative care services: one regional and two metropolitan services in Victoria, Australia. The services demonstrated that it was feasible to embed the Model into their organizational structures. Advance care planning conversations and involvement of family was an important outcome measure rather than completion rate of advance care planning documents in community settings. Services adapted and applied their own concept of community, which widened the impact of the model. Changes to quality audit processes were essential to consolidate the model into routine palliative care practice. An advance care planning model is feasible for community palliative care services. Quality audit processes are an essential component of the Model with documentation of advance care planning discussion established as an important outcome measure. © 2011 Blackwell Publishing Ltd.

  12. SU-D-BRC-02: Application of Six Sigma Approach to Improve the Efficiency of Patient-Specific QA in Proton Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LAH, J; Shin, D; Manger, R

    Purpose: To show how the Six Sigma DMAIC (Define-Measure-Analyze-Improve-Control) can be used for improving and optimizing the efficiency of patient-specific QA process by designing site-specific range tolerances. Methods: The Six Sigma tools (process flow diagram, cause and effect, capability analysis, Pareto chart, and control chart) were utilized to determine the steps that need focus for improving the patient-specific QA process. The patient-specific range QA plans were selected according to 7 treatment site groups, a total of 1437 cases. The process capability index, Cpm was used to guide the tolerance design of patient site-specific range. We also analyzed the financial impactmore » of this project. Results: Our results suggested that the patient range measurements were non-capable at the current tolerance level of ±1 mm in clinical proton plans. The optimized tolerances were calculated for treatment sites. Control charts for the patient QA time were constructed to compare QA time before and after the new tolerances were implemented. It is found that overall processing time was decreased by 24.3% after establishing new site-specific range tolerances. The QA failure for whole process in proton therapy would lead up to a 46% increase in total cost. This result can also predict how costs are affected by changes in adopting the tolerance design. Conclusion: We often believe that the quality and performance of proton therapy can easily be improved by merely tightening some or all of its tolerance requirements. This can become costly, however, and it is not necessarily a guarantee of better performance. The tolerance design is not a task to be undertaken without careful thought. The Six Sigma DMAIC can be used to improve the QA process by setting optimized tolerances. When tolerance design is optimized, the quality is reasonably balanced with time and cost demands.« less

  13. Pacific Northwest National Laboratory’s Climate Resiliency Planning Process and Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, Kimberly M.; Judd, Kathleen S.; Brandenberger, Jill M.

    2016-02-22

    In 2015, the Pacific Northwest National Laboratory (PNNL) developed its first Climate Resilience Plan for its Richland Campus. PNNL has performed Climate Resilience Planning for the Department of Defense, Nuclear Regulatory Commission, and Department of Energy (DOE) over the past 5 years. The assessment team included climate scientists, social scientists, engineers, and operations managers. A multi-disciplinary team was needed to understand the potential exposures to future changes at the site, the state of the science on future impacts, and the best process for “mainstreaming” new actions into existing activities. The team uncovered that the site’s greatest vulnerabilities, and therefore prioritiesmore » for climate resilience planning, are high temperature due to degraded infrastructure, increased wildfire frequency, and intense precipitation impacts on stormwater conveyance systems.« less

  14. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    PubMed

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is needed to evaluate the implementation of the plans and, in many cases, the impact of the process on the plan. Performance can be improved with the assistance of policy makers by further developing guidelines, harmonising payment schemes with the conservation measures of the plans and providing training on conflict resolution. The evaluation framework proved to be suitable for the assessment of a large set of conservation related management planning processes, but it also had some limitations, e.g. concerning the incorporation of stakeholders' views in the evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. Interactive Management and Updating of Spatial Data Bases

    NASA Technical Reports Server (NTRS)

    French, P.; Taylor, M.

    1982-01-01

    The decision making process, whether for power plant siting, load forecasting or energy resource planning, invariably involves a blend of analytical methods and judgement. Management decisions can be improved by the implementation of techniques which permit an increased comprehension of results from analytical models. Even where analytical procedures are not required, decisions can be aided by improving the methods used to examine spatially and temporally variant data. How the use of computer aided planning (CAP) programs and the selection of a predominant data structure, can improve the decision making process is discussed.

  16. 2016 Groundwater Monitoring and Inspection Report Gnome-Coach, New Mexico, Site January 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kreie, Ken; Findlay, Rick

    The Gnome-Coach, New Mexico, Site was the location of an underground nuclear test in 1961 and a groundwater tracer test in 1963. Residual contamination remaining in the subsurface from these events requires long-term oversight. The Long-Term Surveillance and Maintenance Plan for the site describes the U.S. Department of Energy Office of Legacy Management’s (LM’s) plan for monitoring groundwater (radiochemical sampling and hydraulic head measurements), inspecting the site, maintaining the site’s institutional controls, evaluating and reporting data, and documenting the site’s records and data management processes. Groundwater monitoring and site inspection activities are conducted annually. This report summarizes the results ofmore » these activities conducted during the October 2015 through September 2016 reporting period. The site inspection and annual sampling were conducted on January 27, 2016. At the time of the site inspection, the signs installed near the emplacement shaft, near well USGS-1, and around the perimeter of the site were observed as being in good condition, as were the roads, wellheads, and Project Gnome monument. No new groundwater extraction wells or oil and gas wells were installed during this reporting period on the site or in the sections that surround the site. One new application was received by the New Mexico Oil Conservation Division to install a salt water disposal well approximately 0.8 miles northeast of the Project Gnome monument. The proposed well has a planned completion depth of 15,500 feet below ground surface, but as of November 2016 a drill date has not been established.« less

  17. UMTRA project water sampling and analysis plan, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  18. Data Validation Package October 2015 Groundwater and Surface Water Sampling at the Monticello, Utah, Processing Site January 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Jason; Smith, Fred

    Sampling Period: October 12–14, 2015. This semiannual event includes sampling groundwater and surface water at the Monticello Mill Tailings Site. Sampling and analyses were conducted as specified in the 2004 Monticello Mill Tailings Site Operable Unit III Post-Record of Decision Monitoring Plan, Draft Final and Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). Samples were collected from 52 of 61 planned locations (15 of 17 former mill site wells, 17 of 18 downgradient wells, 9 of 9 downgradient permeable reactive barrier wells, 2 of 7 seeps and wetlands, and 9 ofmore » 10 surface water locations). Locations MW00-07, Seep 1, Seep 2, Seep 3, Seep 5, Seep 6, SW00-01, T01-13, and T01-19 were not sampled because of insufficient water availability. All samples were filtered as specified in the monitoring plan. Duplicate samples were collected from surface water location W3-04 and from monitoring wells 82-08, 92-09, and 92-10. Water levels were measured at all but one sampled well and an additional set of wells. The contaminants of concern (COCs) for the Monticello Mill Tailings Site are arsenic, manganese, molybdenum, nitrate + nitrite as nitrogen (nitrate + nitrite as N), selenium, uranium, and vanadium. Time-concentration graphs of the COCs for all groundwater and surface water locations are included in this report. Locations with COCs that exceeded remediation goals are listed.« less

  19. Guidelines for treatment naming in radiation oncology

    PubMed Central

    Shields, Lisa B. E.; Hahl, Michael; Maudlin, Casey; Bassett, Mark; Spalding, Aaron C.

    2015-01-01

    Safety concerns may arise from a lack of standardization and ambiguity during the treatment planning and delivery process in radiation therapy. A standardized target and organ‐at‐risk naming convention in radiation therapy was developed by a task force comprised of several Radiation Oncology Societies. We present a nested‐survey approach in a community setting to determine the methodology for radiation oncology departments to standardize their practice. Our Institution's continuous quality improvement (CQI) committee recognized that, due to growth from one to three centers, significant variability existed within plan parameters specific to patients’ treatment. A multidiscipline, multiclinical site consortium was established to create a guideline for standard naming. Input was gathered using anonymous, electronic surveys from physicians, physicists, dosimetrists, chief therapists, and nurse managers. Surveys consisted of several primary areas of interest: anatomical sites, course naming, treatment plan naming, and treatment field naming. Additional concepts included capitalization, specification of laterality, course naming in the event of multiple sites being treated within the same course of treatment, primary versus boost planning, the use of bolus, revisions for plans, image‐guidance field naming, forbidden characters, and standard units for commonly used physical quantities in radiation oncology practice. Guidelines for standard treatment naming were developed that could be readily adopted. This multidisciplinary study provides a clear, straightforward, and easily implemented protocol for the radiotherapy treatment process. Standard nomenclature facilitates the safe means of communication between team members in radiation oncology. The guidelines presented in this work serve as a model for radiation oncology clinics to standardize their practices. PACS number(s): 87.56.bd, 87.56.Fc, 87.55.Qr, 87.55.‐x, 87.55.N‐, 87.55.T‐, 87.55.D‐ PMID:27074449

  20. SU-E-T-420: Failure Effects Mode Analysis for Trigeminal Neuralgia Frameless Radiosurgery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howe, J

    2015-06-15

    Purpose: Functional radiosurgery has been used successfully in the treatment of trigeminal neuralgia but presents significant challenges to ensuring the high prescription dose is delivered accurately. A review of existing practice should help direct the focus of quality improvement for this treatment regime. Method: Failure modes and effects analysis was used to identify the processes in preparing radiosurgery treatment for TN. The map was developed by a multidisciplinary team including: neurosurgeon, radiation oncology, physicist and therapist. Potential failure modes were identified for each step in the process map as well as potential causes and end effect. A risk priority numbermore » was assigned to each cause. Results: The process map identified 66 individual steps (see attached supporting document). Corrective actions were developed for areas of high risk priority number. Wrong site treatment is at higher risk for trigeminal neuralgia treatment due to the lack of site specific pathologic imaging on MR and CT – additional site specific checks were implemented to minimize the risk of wrong site treatment. Failed collision checks resulted from an insufficient collision model in the treatment planning system and a plan template was developed to address this problem. Conclusion: Failure modes and effects analysis is an effective tool for developing quality improvement in high risk radiotherapy procedures such as functional radiosurgery.« less

  1. Development and implementation of a scrub habitat compensation plan for Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Schmalzer, Paul A.; Breininger, David R.; Adrian, Frederic W.; Schaub, Ron; Duncan, Brean W.

    1994-01-01

    Kennedy Space Center (KSC), located on Merritt Island on the east coast of central Florida, is one of three remaining major populations of the Florida Scrub Jay (Aphelocoma coerulescens coerulescens), listed as threatened by the U.S. Fish and Wildlife Service (USFWS) since 1987. Construction of new facilities by the National Aeronautics and Space Administration (NASA) on KSC over the next five years has the potential to impact up to 193 ac (78.1 ha) of Scrub Jay habitat. Under an early consultation process with the Endangered Species Office of the USFWS, NASA agreed to a compensation plan for loss of Scrub Jay habitat. The compensation plan required NASA to restore or create scrub on KSC at a 2:1 ratio for that lost. The compensation plan emphasized restoration of scrub habitat that is of marginal or declining suitability to Scrub Jays because it has remained unburned. Although prescribed burning has been conducted by the USFWS Merritt Island National Wildlife Refuge (MINWR) for more than ten years, significant areas of scrub remain unburned because they have been excluded from fire management units or because landscape fragmentation and a period of fire suppression allowed scrub to reach heights and diameters that are fire resistant. For such areas, mechanical cutting followed by prescribed burning was recommended for restoration. A second part of the restoration plan is an experimental study of scrub reestablishment (i.e., creation) on abandoned, well drained agricultural sites by planting scrub oaks and other scrub plants. The compensation plan identified 260 ac (105 ha) of scrub restoration in four areas and a 40 ac (16 ha) scrub creation site. Monitoring of restoration sites required under the plan included: establishing permanent vegetation sample transects before treatment and resampling annually for ten years after treatment, and color banding Scrub Jays to determine territories prior to treatment followed by monitoring reproductive success and survival for ten years after treatment. Monitoring scrub creation sites included determining survival of planted material for five years and establishing permanent transects to follow vegetation development for ten years after planting. Scrub Jay monitoring of creation sites is incorporated with that of adjacent restoration sites.

  2. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 3, Groundwater hydrology report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites. According to the Uranium Mill Tailings Radiation Control Act of 1978, (UMTRCA) the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include:more » Characterization of the hydrogeologic environment; characterization of existing groundwater quality; definition of physical and chemical characteristics of the potential contaminant source; and description of local water resources.« less

  3. NRC Waste Incidental to Reprocessing Program: Overview of Consultation and Monitoring Activities at the Idaho National Laboratory and the Savannah River Site - What We Have Learned - 12470

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Suber, Gregory

    2012-07-01

    In 2005 the U.S. Nuclear Regulatory Commission (NRC) began to implement a new set of responsibilities under the Ronald W. Reagan National Defense Authorization Act (NDAA) of Fiscal Year 2005. Section 3116 of the NDAA requires the U.S. Department of Energy (DOE) to consult with the NRC for certain non-high level waste determinations and also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2005, the NRC staff began consulting with DOE and completed reviews of draft waste determinations for salt waste at the Savannah River Site. In 2006, a second review was completed onmore » tank waste residuals including sodium-bearing waste at the Idaho Nuclear Technology and Engineering Center Tank Farm at the Idaho National Laboratory. Monitoring Plans were developed for these activities and the NRC is actively monitoring disposal actions at both sites. NRC is currently in consultation with DOE on the F-Area Tank Farm closure and anticipates entering consultation on the H-Area Tank Farm at the Savannah River Site. This paper presents, from the NRC perspective, an overview of how the consultation and monitoring process has evolved since its conception in 2005. It addresses changes in methods and procedures used to collect and develop information used by the NRC in developing the technical evaluation report and monitoring plan under consultation and the implementation the plan under monitoring. It will address lessons learned and best practices developed throughout the process. The NDAA has presented significant challenges for the NRC and DOE. Past and current successes demonstrate that the NDAA can achieve its intended goal of facilitating tank closure at DOE legacy defense waste sites. The NRC believes many of the challenges in performing the WD reviews have been identified and addressed. Lessons learned have been collected and documented throughout the review process. Future success will be contingent on each agencies commitment to consistently apply the lessons learned and continue to create an open and collaborative work environment to maintain the process of continuous improvement. (authors)« less

  4. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States andmore » details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.« less

  5. Space-planning and structural solutions of low-rise buildings: Optimal selection methods

    NASA Astrophysics Data System (ADS)

    Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander

    2017-11-01

    The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.

  6. Planning for disaster resilience in rural, remote, and coastal communities: moving from thought to action.

    PubMed

    Murphy, Brenda L; Anderson, Gregory S; Bowles, Ron; Cox, Robin S

    2014-01-01

    Disaster resilience is the cornerstone of effective emergency management across all phases of a disaster from preparedness through response and recovery. To support community resilience planning in the Rural Disaster Resilience Project (RDRP) Planning Framework, a print-based version of the guide book and a suite of resilience planning tools were field tested in three communities representing different regions and geographies within Canada. The results provide a cross-case study analysis from which lessons learned can be extracted. The authors demonstrate that by encouraging resilience thinking and proactive planning even very small rural communities can harness their inherent strengths and resources to enhance their own disaster resilience, as undertaking the resilience planning process was as important as the outcomes.The resilience enhancement planning process must be flexible enough to allow each community to act independently to meet their own needs. The field sites demonstrate that any motivated group of individuals, representing a neighborhood or some larger area could undertake a resilience initiative, especially with the assistance of a bridging organization or tool such as the RDRP Planning Framework.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nichols, Will E.; Mehta, Sunil

    The updated Hanford Site Composite Analysis will provide an all-pathways dose projection to a hypothetical future member of the public from all planned low-level radioactive waste disposal facilities and potential contributions from all other projected end-state sources of radioactive material left at Hanford following site closure. Its primary purpose is to support the decision-making process of the U.S. Department of Energy (DOE) under DOE O 435.1-1, Radioactive Waste Management (DOE, 2001), related to managing low-level waste disposal facilities at the Hanford Site.

  8. Data Validation Package April 2016 Groundwater and Surface Water Sampling at the Monticello, Utah, Disposal and Processing Sites August 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Jason; Smith, Fred

    This semiannual event includes sampling groundwater and surface water at the Monticello Disposal and Processing Sites. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated) and Program Directive MNT-2016-01. Complete sample sets were collected from 42 of 48 planned locations (9 of 9 former mill site wells, 13 of 13 downgradient wells, 7 of 9 downgradient permeable reactive barrier wells, 4 of 7 seeps and wetlands, and 9 of 10 surface water locations). Planned monitoring locations are shown in Attachment 1, Sampling andmore » Analysis Work Order. Locations R6-M3, SW00-01, Seep 1, Seep 2, and Seep 5 were not sampled due to insufficient water availability. A partial sample was collected at location R4-M3 due to insufficient water. All samples from the permeable reactive barrier wells were filtered as specified in the program directive. Duplicate samples were collected from surface water location Sorenson and from monitoring wells 92-07 and RlO-Ml. Water levels were measured at all sampled wells and an additional set of wells. See Attachment2, Trip Report for additional details. The contaminants of concern (COCs) for the Monticello sites are arsenic, manganese, molybdenum, nitrate+ nitrite as nitrogen (nitrate+ nitrite as N), selenium, uranium, and vanadium. Locations with COCs that exceeded remediation goals are listed in Table 1 and Table 2. Time-concentration graphs of the COCs for all groundwater and surface water locations are included in Attachment 3, Data Presentation. An assessment of anomalous data is included in Attachment 4.« less

  9. Evolving the US Climate Resilience Toolkit to Support a Climate-Smart Nation

    NASA Astrophysics Data System (ADS)

    Tilmes, C.; Niepold, F., III; Fox, J. F.; Herring, D.; Dahlman, L. E.; Hall, N.; Gardiner, N.

    2015-12-01

    Communities, businesses, resource managers, and decision-makers at all levels of government need information to understand and ameliorate climate-related risks. Likewise, climate information can expose latent opportunities. Moving from climate science to social and economic decisions raises complex questions about how to communicate the causes and impacts of climate variability and change; how to characterize and quantify vulnerabilities, risks, and opportunities faced by communities and businesses; and how to make and implement "win-win" adaptation plans at local, regional, and national scales. A broad coalition of federal agencies launched the U.S. Climate Resilience Toolkit (toolkit.climate.gov) in November 2014 to help our nation build resilience to climate-related extreme events. The site's primary audience is planners and decision makers in business, resource management, and government (at all levels) who seek science-based climate information and tools to help them in their near- and long-term planning. The Executive Office of the President assembled a task force of dozens of subject experts from across the 13 agencies of the U.S. Global Change Research Program to guide the site's development. The site's ongoing evolution is driven by feedback from the target audience. For example, based on feedback, climate projections will soon play a more prominent role in the site's "Climate Explorer" tool and case studies. The site's five-step adaptation planning process is being improved to better facilitate people getting started and to provide clear benchmarks for evaluating progress along the way. In this session, we will share lessons learned from a series of user engagements around the nation and evidence that the Toolkit couples climate information with actionable decision-making processes in ways that are helping Americans build resilience to climate-related stressors.

  10. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  11. A new metric for assessing IMRT modulation complexity and plan deliverability.

    PubMed

    McNiven, Andrea L; Sharpe, Michael B; Purdie, Thomas G

    2010-02-01

    To evaluate the utility of a new complexity metric, the modulation complexity score (MCS), in the treatment planning and quality assurance processes and to evaluate the relationship of the metric with deliverability. A multisite (breast, rectum, prostate, prostate bed, lung, and head and neck) and site-specific (lung) dosimetric evaluation has been completed. The MCS was calculated for each beam and the overall treatment plan. A 2D diode array (MapCHECK, Sun Nuclear, Melbourne, FL) was used to acquire measurements for each beam. The measured and planned dose (PINNACLE3, Phillips, Madison, WI) was evaluated using different percent differences and distance to agreement (DTA) criteria (3%/ 3 mm and 2%/ 1 mm) and the relationship between the dosimetric results and complexity (as measured by the MCS or simple beam parameters) assessed. For the multisite analysis (243 plans total), the mean MCS scores for each treatment site were breast (0.92), rectum (0.858), prostate (0.837), prostate bed (0.652), lung (0.631), and head and neck (0.356). The MCS allowed for compilation of treatment site-specific statistics, which is useful for comparing different techniques, as well as for comparison of individual treatment plans with the typical complexity levels. For the six plans selected for dosimetry, the average diode percent pass rate was 98.7% (minimum of 96%) for 3%/3 mm evaluation criteria. The average difference in absolute dose measurement between the planned and measured dose was 1.7 cGy. The detailed lung analysis also showed excellent agreement between the measured and planned dose, as all beams had a diode percentage pass rate for 3%/3 mm criteria of greater than 95.9%, with an average pass rate of 99.0%. The average absolute maximum dose difference for the lung plans was 0.7 cGy. There was no direct correlation between the MCS and simple beam parameters which could be used as a surrogate for complexity level (i.e., number of segments or MU). An evaluation criterion of 2%/ 1 mm reliably allowed for the identification of beams that are dosimetrically robust. In this study we defined a robust beam or plan as one that maintained a diode percentage pass rate greater than 90% at 2%/ 1 mm, indicating delivery that was deemed accurate when compared to the planned dose, even under stricter evaluation criterion. MCS and MU threshold criteria were determined by defining a required specificity of 1.0. A MCS threshold of 0.8 allowed for identification of robust deliverability with a sensitivity of 0.36. In contrast, MU had a lower sensitivity of 0.23 for a threshold of 50 MU. The MCS allows for a quantitative assessment of plan complexity, on a fixed scale, that can be applied to all treatment sites and can provide more information related to dose delivery than simple beam parameters. This could prove useful throughout the entire treatment planning and QA process.

  12. Liquid secondary waste. Waste form formulation and qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A. D.; Dixon, K. L.; Hill, K. A.

    The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during Site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilization Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the Integrated Disposal Facility IDF). Waste form testingmore » to support this plan is composed of work in the near term to demonstrate the waste form will provide data as input to a performance assessment (PA) for Hanford’s IDF.« less

  13. 75 FR 39093 - Proposed Confidentiality Determinations for Data Required Under the Mandatory Greenhouse Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... information that is sensitive or proprietary, such as detailed process designs or site plans. Because the... Inputs to Emission Equations X Calculation Methodology and Methodological Tier X Data Elements Reported...

  14. CONSIDERATIONS FOR INNOVATIVE REMEDIATION TECHNOLOGY EVALUATION SAMPLING PLANS

    EPA Science Inventory

    Field trials of innovative subsurface cleanup technologies require the use of integrated site characterization approaches to obtain critical design parameters, to evaluate pre-treatment contaminant distributions, and to assess process efficiency. This review focuses on the trans...

  15. Spatio-temporal modelling of electrical supply systems to optimize the site planning process for the "power to mobility" technology

    NASA Astrophysics Data System (ADS)

    Karl, Florian; Zink, Roland

    2016-04-01

    The transformation of the energy sector towards decentralized renewable energies (RE) requires also storage systems to ensure security of supply. The new "Power to Mobility" (PtM) technology is one potential solution to use electrical overproduction to produce methane for i.e. gas vehicles. Motivated by these fact, the paper presents a methodology for a GIS-based temporal modelling of the power grid, to optimize the site planning process for the new PtM-technology. The modelling approach is based on a combination of the software QuantumGIS for the geographical and topological energy supply structure and OpenDSS for the net modelling. For a case study (work in progress) of the city of Straubing (Lower Bavaria) the parameters of the model are quantified. The presentation will discuss the methodology as well as the first results with a view to the application on a regional scale.

  16. 14 CFR 420.59 - Launch site accident investigation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch site accident investigation plan... Licensee § 420.59 Launch site accident investigation plan. (a) General. A licensee shall develop and implement a launch site accident investigation plan that contains the licensee's procedures for reporting...

  17. 14 CFR 420.59 - Launch site accident investigation plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Launch site accident investigation plan... Licensee § 420.59 Launch site accident investigation plan. (a) General. A licensee shall develop and implement a launch site accident investigation plan that contains the licensee's procedures for reporting...

  18. Medical waste management plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lane, Todd W.; VanderNoot, Victoria A.

    2004-12-01

    This plan describes the process for managing research generated medical waste at Sandia National Laboratories/California. It applies to operations at the Chemical and Radiation Detection Laboratory (CRDL), Building 968, and other biosafety level 1 or 2 activities at the site. It addresses the accumulation, storage, treatment and disposal of medical waste and sharps waste. It also describes the procedures to comply with regulatory requirements and SNL policies applicable to medical waste.

  19. Corrective Action Investigation Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada with ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature andmore » extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of contamination at CAU 541 will be evaluated based on information collected from field investigations. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less

  20. Multisite Assessment of Nursing Continuing Education Learning Needs Using an Electronic Tool.

    PubMed

    Winslow, Susan; Jackson, Stephanie; Cook, Lesley; Reed, Joanne Williams; Blakeney, Keshia; Zimbro, Kathie; Parker, Cindy

    2016-02-01

    A continued education needs assessment and associated education plan are required for organizations on the journey for American Nurses Credentialing Center Magnet® designation. Leveraging technology to support the assessment and analysis of continuing education needs was a new venture for a 12-hospital regional health system. The purpose of this performance improvement project was to design and conduct an enhanced process to increase the efficiency and effectiveness of gathering data on nurses' preferences and increase nurse satisfaction with the learner assessment portion of the process. Educators trialed the use of a standardized approach via an electronic survey tool to replace the highly variable processes previously used. Educators were able to view graphical summary of responses by category and setting, which substantially decreased analysis and action planning time for education implementation plans at the system, site, or setting level. Based on these findings, specific continuing education action plans were drafted for each category and classification of nurses. Copyright 2016, SLACK Incorporated.

  1. The Global Space Geodesy Network and the Essential Role of Latin America Sites

    NASA Astrophysics Data System (ADS)

    Pearlman, M. R.; Ma, C.; Neilan, R.; Noll, C. E.; Pavlis, E. C.; Wetzel, S.

    2013-05-01

    The improvements in the reference frame and other space geodesy data products spelled out in the GGOS 2020 plan will evolve over time as new space geodesy sites enhance the global distribution of the network, and new technologies are implemented at current and new sites, thus enabling improved data processing and analysis. The goal of 30 globally distributed core sites with VLBI, SLR, GNSS and DORIS (where available) will take time to materialize. Co-location sites with less than the full core complement will continue to play a very important role in filling out the network while it is evolving and even after full implementation. GGOS, through its Call for Participation, bi-lateral and multi-lateral discussions, and work through the scientific Services have been encouraging current groups to upgrade and new groups to join the activity. This talk will give an update on the current expansion of the global network and the projection for the network configuration that we forecast over the next 10 years based on discussions and planning that has already occurred. We will also discuss some of the historical contributions to the reference frame from sites in Latin America and need for new sites in the future.

  2. Optimizing Ocean Space: Co-siting Open Ocean Aquaculture

    NASA Astrophysics Data System (ADS)

    Cobb, B. L.; Wickliffe, L. C.; Morris, J. A., Jr.

    2016-12-01

    In January of 2016, NOAA's National Marine Fisheries Service released the Gulf Aquaculture Plan (GAP) to manage the development of environmentally sound and economically sustainable open ocean finfish aquaculture in the Gulf of Mexico (inside the U.S. Exclusive Economic Zone [EEZ]). The GAP provides the first regulatory framework for aquaculture in federal waters with estimated production of 64 million pounds of finfish, and an estimated economic impact of $264 million annually. The Gulf of Mexico is one of the most industrialized ocean basins in the world, with many existing ocean uses including oil and natural gas production, shipping and commerce, commercial fishing operations, and many protected areas to ensure conservation of valuable ecosystem resources and services. NOAA utilized spatial planning procedures and tools identifying suitable sites for establishing aquaculture through exclusion analyses using authoritative federal and state data housed in a centralized geodatabase. Through a highly collaborative, multi-agency effort a mock permitting exercise was conducted to illustrate the regulatory decision-making process for the Gulf. Further decision-making occurred through exploring co-siting opportunities with oil and natural gas platforms. Logistical co-siting was conducted to reduce overall operational costs by looking at distance to major port and commodity tonnage at each port. Importantly, the process of co-siting allows aquaculture to be coupled with other benefits, including the availability of previously established infrastructure and the reduction of environmental impacts.

  3. Hynol Process Engineering: Process Configuration, Site Plan, and Equipment Design

    DTIC Science & Technology

    1996-02-01

    feed stock. Compared with other methanol production processes, direct emissions of carbon dioxide can be substantially reduced by using the Hynol...A bench scale methanol production facility is being constructed to demonstrate the technical feasibility of producing methanol from biomass using the ...Hynol process. The plant is being designed to convert 50 lb./hr of biomass to methanol. The biomass consists of wood, and natural gas is used as a co

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Campbell, Sam; Dam, Wiliam

    In 2012, the U.S.Department of Energy (DOE) began reassessing the former Riverton, Wyoming, Processing Site area for potential contaminant sources impacting groundwater. A flood in 2010 along the Little Wind River resulted in increases in groundwater contamination (DOE 2013).This investigation is a small part of continued efforts by DOE and other stakeholders to update human health and ecological risk assessments, to make a comprehensive examination of all exposure pathways to ensure that the site remains protective through established institutional controls. During field inspections at the Riverton Site in 2013, a white evaporitic mineral deposit was identified along the bank ofmore » the Little Wind River within the discharge zone of the groundwater contamination plume. In December 2013, Savannah River National Laboratory (SRNL) personnel collected a sample for analysis by X-ray fluorescence (Figure 1 shows the type of material sampled). The sample had a uranium concentration of approximately 64 to 73 parts per million. Although the uranium in this mineral deposit is within the expected range for evaporatic minerals in the western United States (SRNL 2014), DOE determined that additional assessment of the mineral deposit was warranted. In response to the initial collection and analysis of a sample of the mineral deposit, DOE developed a work plan (Work Plan to Sample Mineral Deposits Along the Little Wind River, Riverton, Wyoming, Processing Site [DOE 2014]) to further define the extent of these mineral deposits and the concentration of the associated contaminants (Appendix A). The work plan addressed field reconnaissance, mapping, sampling, and the assessment of risk associated with the mineral deposits adjacent to the Little Wind River.« less

  5. ILRS: Current Status and Future Challenges

    NASA Astrophysics Data System (ADS)

    Pearlman, M. R.; Bianco, G.; Merkowitz, S.; Noll, C. E.; Pavlis, E. C.; Shargorodsky, V.; Zhongping, Z.

    2016-12-01

    The International Laser Ranging Service (ILRS) is expanding its ground tracking capability with new stations and upgrades to current stations. Our Russian colleagues have installed new stations in Brasilia and South Africa, and have several other sites in process or in planning. The NASA Space Geodesy Program is preparing equipment for U.S. sites (McDonald and Haleakala) and with the Norwegian National Mapping Agency in Ny Ålesund; further deployments are planned. Upgrades continue at sites in China, and new sites are underway or planned in Europe and India. Stations are moving to higher repetition rates and more efficient detection to enhance satellite interleaving capability; some stations have already implemented automated processes that could lead to around-the-clock operation to increase temporal coverage and to make more efficient use of personnel. The ILRS roster of supported satellites continues to grow with the addition of the LARES satellite to augment tracking for the improvement of the ITRF. New GNSS constellations and geosynchronous satellites now bring the total roster to over 80 satellites - so much so, that new tracking strategies and time and location multiplexing are under consideration. There continues to be strong interest in Lunar Ranging. New applications of one-way and two-way laser ranging include ps-accurate time transfer, laser transponders for interplanetary ranging, and tracking of space debris. New laser ranging data products are being developed, including satellite orbit products, satellite orientation, gravity field products, and products to characterize the quality of data and station performance. This talk will give a brief summary of recent progress, current challenges and a view of the path ahead.

  6. Geological and technological assessment of artificial reef sites, Louisiana outer continental shelf

    USGS Publications Warehouse

    Pope, D.L.; Moslow, T.F.; Wagner, J.B.

    1993-01-01

    This paper describes the general procedures used to select sites for obsolete oil and gas platforms as artificial reefs on the Louisiana outer continental shelf (OCS). The methods employed incorporate six basic steps designed to resolve multiple-use conflicts that might otherwise arise with daily industry and commercial fishery operations, and to identify and assess both geological and technological constraints that could affect placement of the structures. These steps include: (1) exclusion mapping; (2) establishment of artificial reef planning areas; (3) database compilation; (4) assessment and interpretation of database; (5) mapping of geological and man-made features within each proposed reef site; and (6) site selection. Nautical charts, bathymetric maps, and offshore oil and gas maps were used for exclusion mapping, and to select nine regional planning areas. Pipeline maps were acquired from federal agencies and private industry to determine their general locations within each planning area, and to establish exclusion fairways along each pipeline route. Approximately 1600 line kilometers of high-resolution geophysical data collected by federal agencies and private industry was acquired for the nine planning areas. These data were interpreted to determine the nature and extent of near-surface geologic features that could affect placement of the structures. Seismic reflection patterns were also characterized to evaluate near-bottom sedimentation processes in the vicinity of each reef site. Geotechnical borings were used to determine the lithological and physical properties of the sediment, and for correlation with the geophysical data. Since 1987, five sites containing 10 obsolete production platforms have been selected on the Louisiana OCS using these procedures. Industry participants have realized a total savings of approximately US $1 500 000 in salvaging costs by converting these structures into artificial reefs. ?? 1993.

  7. Road-map to plan and structure the preliminary site investigation program for a geological repository in Japan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deguchi, Akira; Tsuchi, Hiroyuki; Kitayama, Kazumi

    2007-07-01

    Available in abstract form only. Full text of publication follows: A stepwise site selection process has been adopted for geological disposal of HLW in Japan. Literature surveys (LS), followed by preliminary investigations (PI) and, finally, detailed investigations (DI) in underground facilities will be carried out in the successive selection stages. In the PI stage, surface-based investigations such as borehole surveys and geophysical prospecting will be implemented with two main objectives. The first is to obtain information relating to legal requirements on siting, such as the occurrence of igneous or fault activity, and to confirm the extremely low likelihood of adversemore » impacts on the candidate site resulting from such phenomena. The second is to obtain the information required for the design and performance assessment of the engineered barrier system and the repository. In order to implement these preliminary investigations rigorously and efficiently within the constraints of a limited time period, budget and resources, PI planning before commencing investigations and on-site PI management during the investigation phase are very important issues. The planning and management of PI have to be performed by NUMO staff, but not all staff have sufficient experience in the range of disciplines involved. NUMO therefore decided to compile existing knowledge and experience in the planning and management of investigations in the form of manuals to be used to improve and maintain internal expertise. Experts with experience in overseas investigation programs were requested to prepare these manuals. This paper outlines the structure and scope of the upper level manual (road-map) and discusses NUMO's experience in applying it in 'dry-runs' to model sites. (authors)« less

  8. Automated IMRT planning with regional optimization using planning scripts

    PubMed Central

    Wong, Eugene; Bzdusek, Karl; Lock, Michael; Chen, Jeff Z.

    2013-01-01

    Intensity‐modulated radiation therapy (IMRT) has become a standard technique in radiation therapy for treating different types of cancers. Various class solutions have been developed for simple cases (e.g., localized prostate, whole breast) to generate IMRT plans efficiently. However, for more complex cases (e.g., head and neck, pelvic nodes), it can be time‐consuming for a planner to generate optimized IMRT plans. To generate optimal plans in these more complex cases which generally have multiple target volumes and organs at risk, it is often required to have additional IMRT optimization structures such as dose limiting ring structures, adjust beam geometry, select inverse planning objectives and associated weights, and additional IMRT objectives to reduce cold and hot spots in the dose distribution. These parameters are generally manually adjusted with a repeated trial and error approach during the optimization process. To improve IMRT planning efficiency in these more complex cases, an iterative method that incorporates some of these adjustment processes automatically in a planning script is designed, implemented, and validated. In particular, regional optimization has been implemented in an iterative way to reduce various hot or cold spots during the optimization process that begins with defining and automatic segmentation of hot and cold spots, introducing new objectives and their relative weights into inverse planning, and turn this into an iterative process with termination criteria. The method has been applied to three clinical sites: prostate with pelvic nodes, head and neck, and anal canal cancers, and has shown to reduce IMRT planning time significantly for clinical applications with improved plan quality. The IMRT planning scripts have been used for more than 500 clinical cases. PACS numbers: 87.55.D, 87.55.de PMID:23318393

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haney, Thomas Jay

    This report documents the Data Quality Objectives (DQOs) developed for the Idaho National Laboratory (INL) Site ambient air surveillance program. The development of the DQOs was based on the seven-step process recommended “for systematic planning to generate performance and acceptance criteria for collecting environmental data” (EPA 2006). The process helped to determine the type, quantity, and quality of data needed to meet current regulatory requirements and to follow U.S. Department of Energy guidance for environmental surveillance air monitoring design. It also considered the current air monitoring program that has existed at INL Site since the 1950s. The development of themore » DQOs involved the application of the atmospheric dispersion model CALPUFF to identify likely contamination dispersion patterns at and around the INL Site using site-specific meteorological data. Model simulations were used to quantitatively assess the probable frequency of detection of airborne radionuclides released by INL Site facilities using existing and proposed air monitors.« less

  10. Computer-based planning of optimal donor sites for autologous osseous grafts

    NASA Astrophysics Data System (ADS)

    Krol, Zdzislaw; Chlebiej, Michal; Zerfass, Peter; Zeilhofer, Hans-Florian U.; Sader, Robert; Mikolajczak, Pawel; Keeve, Erwin

    2002-05-01

    Bone graft surgery is often necessary for reconstruction of craniofacial defects after trauma, tumor, infection or congenital malformation. In this operative technique the removed or missing bone segment is filled with a bone graft. The mainstay of the craniofacial reconstruction rests with the replacement of the defected bone by autogeneous bone grafts. To achieve sufficient incorporation of the autograft into the host bone, precise planning and simulation of the surgical intervention is required. The major problem is to determine as accurately as possible the donor site where the graft should be dissected from and to define the shape of the desired transplant. A computer-aided method for semi-automatic selection of optimal donor sites for autografts in craniofacial reconstructive surgery has been developed. The non-automatic step of graft design and constraint setting is followed by a fully automatic procedure to find the best fitting position. In extension to preceding work, a new optimization approach based on the Levenberg-Marquardt method has been implemented and embedded into our computer-based surgical planning system. This new technique enables, once the pre-processing step has been performed, selection of the optimal donor site in time less than one minute. The method has been applied during surgery planning step in more than 20 cases. The postoperative observations have shown that functional results, such as speech and chewing ability as well as restoration of bony continuity were clearly better compared to conventionally planned operations. Moreover, in most cases the duration of the surgical interventions has been distinctly reduced.

  11. The Role of the Environmental Management Site Specific Advisory Board under the Federal Advisory Committee Act, With Emphasis on the Northern New Mexico Citizens' Advisory Board - 12482

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Santistevan, Menice B.

    2012-07-01

    The Environmental Management Site Specific Advisory Board (EM SSAB) is comprised of eight Citizens' Advisory Boards, chartered under the Federal Advisory Committee Act (FACA) by the Assistant Secretary for Environmental Management for the U. S. Department of Energy (DOE). The purpose of the EM SSAB is to provide the DOE with recommendations regarding Environmental Management issues from legacy waste produced at major sites across the DOE Complex. The Northern New Mexico Citizens' Advisory Board (NNMCAB) is the site specific advisory board to the DOE on issues of environmental monitoring, remediation, waste management and long-term stewardship at Los Alamos National Laboratorymore » (LANL). The other boards are located at: Hanford, Idaho, Nevada, Paducah, Portsmouth, Oak Ridge and Savannah River. Using broad citizen outreach and input, the SSAB provides an official mechanism for the citizenry at each of these sites to monitor current activities affecting the region and also to have input into the prioritization of future activities. 'The mission of the EM SSAB is to more directly involve stakeholders in EM Planning and decision-making processes for the nuclear weapons complex cleanup. DOE has various means of involving the public in its planning and decision-making processes; the EM SSAB is only one component of EM's public participation program, and is not intended to be an exclusive means of public participation. It is the policy of DOE and EM to conduct it programs in an open and responsive manner, thereby encouraging and providing the opportunity for public participation in its planning and decision-making processes. EM SSAB members are appointed to a two year term and may serve up to three terms. During this time, members are able to hear many presentation from subject matter experts, attend several site tours at their site and across the DOE complex and are able to express their concerns and give input to the prioritization of clean up at each site. It is an excellent education and it is hoped that these members will go out to their communities, friends and family and discuss these issues in an informed manner. Many times our citizens rely only on newspaper articles or the Internet, which are sometimes replete with fear and misinformation. The more stakeholders are able to be truly informed, the more accurate the discourse will be at each of the DOE sites. (author)« less

  12. SU-F-T-269: Preliminary Experience of Kuwait Cancer Control Center (KCCC) On IMRT Treatment Planning and Pre-Treatment Verification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sethuraman, TKR; Sherif, M; Subramanian, N

    Purpose: The complexity of IMRT delivery requires pre-treatment quality assurance and plan verification. KCCC has implemented IMRT clinically in few sites and will extend to all sites. Recently, our Varian linear accelerator and Eclipse planning system were upgraded from Millennium 80 to 120 Multileaf Collimator (MLC) and from v8.6 to 11.0 respectively. Our preliminary experience on the pre-treatment quality assurance verification is discussed. Methods: Eight Breast, Three Prostate and One Hypopharynx cancer patients were planned with step and shoot IMRT. All breast cases were planned before the upgrade with 60% cases treated. The ICRU 83 recommendations were followed for themore » dose prescription and constraints to OAR for all cases. Point dose measurement was done with CIRS cylindrical phantom and PTW 0.125 cc ionization chamber. Measured dose was compared with calculated dose at the point of measurement. Map CHECK diode array phantom was used for the plan verification. Planned and measured doses were compared by applying gamma index of 3% (dose difference) / 3 mm DTA (average distance to agreement). For all cases, a plan is considered to be successful if more than 95% of the tested diodes pass the gamma test. A prostate case was chosen to compare the plan verification before and after the upgrade. Results: Point dose measurement results were in agreement with the calculated doses. The maximum deviation observed was 2.3%. The passing rate of average gamma index was measured higher than 97% for the plan verification of all cases. Similar result was observed for plan verification of the chosen prostate case before and after the upgrade. Conclusion: Our preliminary experience from the obtained results validates the accuracy of our QA process and provides confidence to extend IMRT to all sites in Kuwait.« less

  13. Situating Green Infrastructure in Context: Adaptive Socio-Hydrology for Sustainable Cities - poster

    EPA Science Inventory

    The benefits of green infrastructure (GI) in controlling urban hydrologic processes have largely focused on practical matters like stormwater management, which drives the planning stage. Green Infrastructure design and implementation usually takes into account physical site chara...

  14. Automated Hazard Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riddle, F. J.

    2003-06-26

    The Automated Hazard Analysis (AHA) application is a software tool used to conduct job hazard screening and analysis of tasks to be performed in Savannah River Site facilities. The AHA application provides a systematic approach to the assessment of safety and environmental hazards associated with specific tasks, and the identification of controls regulations, and other requirements needed to perform those tasks safely. AHA is to be integrated into existing Savannah River site work control and job hazard analysis processes. Utilization of AHA will improve the consistency and completeness of hazard screening and analysis, and increase the effectiveness of the workmore » planning process.« less

  15. Status of the NRC Decommissioning Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orlando, D. A.; Camper, L.; Buckley, J.

    2003-02-24

    On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submitmore » Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.« less

  16. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moss, R. H.; Blohm, A. J.; Delgado, A.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before finalmore » conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure; (4) Vulnerability assessments can be connected to efforts to improve facility resilience to motivate participation; and (5) Efficient, scalable methods for vulnerability assessment can be developed, but additional case studies and evaluation are required.« less

  17. 15 CFR 921.33 - Boundary changes, amendments to the management plan, and addition of multiple-site components.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management plan, and addition of multiple-site components. 921.33 Section 921.33 Commerce and Foreign Trade... management plan, and addition of multiple-site components. (a) Changes in the boundary of a Reserve and major... management plan shall address goals and objectives for all components of the multi-site Reserve and the...

  18. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilmer, J.

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided,more » this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.« less

  19. PLUS: 'Planning Land Use with Students' is a Local Land Use Policy That Showcase the Geosciences

    NASA Astrophysics Data System (ADS)

    Turrin, M.

    2014-12-01

    Land Use decisions in the local community are well represented in geoscience topics and issues, and provide an excellent opportunity to showcase a wide range of geoscience careers to high school students. In PLUS (Planning Land Use with Students) we work with youth corps, volunteer agencies and the County Departments of Planning, Transportation, Public Health, Water Resources to run a program for high school seniors to engage the students in the complex layers of decision making connected with land use as we showcase geoscience careers (http://www.ldeo.columbia.edu/edu/plus/index.html). How development occurs, what resources are in use and who makes these decisions is both interesting and relevant for students. We develop case studies around current, active, local land use issues large enough in scale to have a formal environmental review at the County and/or the State level. Sections of each case study are dedicated to addressing the range of environmental issues that are central to each land use decision. Water, its availability, planned use and treatment on the site, brings in both a review of local hydrology and a discussion of storm water management. Air quality and the impact of the proposed project's density, transportation plans, and commercial and industrial uses brings in air quality issues like air quality ratings, existing pollution, and local air monitoring. A review of the site plans brings in grading plans for the project area, which highlights issues of drainage, soil stability, and exposure to toxins or pollutants depending on the historic use of the site. Brownfield redevelopments are especially challenging with various monitoring, clean up and usage restrictions that are extremely interesting to the students. Students' work with mentors from the community who represent various roles in the planning process including a range of geosciences, community business members and other players in the planning process. This interplay of individuals provides a realistic look at the forces that move land use decision-making in a community. Discussion of impacts and mitigations highlight the intersection of policy and science. Debate arises on how much science should guide policy and how much land use policy decisions require science monitoring, pushing new scientific developments.

  20. Exposing ecological and economic costs of the research-implementation gap and compromises in decision making.

    PubMed

    Kareksela, Santtu; Moilanen, Atte; Ristaniemi, Olli; Välivaara, Reima; Kotiaho, Janne S

    2018-02-01

    The frequently discussed gap between conservation science and practice is manifest in the gap between spatial conservation prioritization plans and their implementation. We analyzed the research-implementation gap of one zoning case by comparing results of a spatial prioritization analysis aimed at avoiding ecological impact of peat mining in a regional zoning process with the final zoning plan. We examined the relatively complex planning process to determine the gaps among research, zoning, and decision making. We quantified the ecological costs of the differing trade-offs between ecological and socioeconomic factors included in the different zoning suggestions by comparing the landscape-level loss of ecological features (species occurrences, habitat area, etc.) between the different solutions for spatial allocation of peat mining. We also discussed with the scientists and planners the reasons for differing zoning suggestions. The implemented plan differed from the scientists suggestion in that its focus was individual ecological features rather than all the ecological features for which there were data; planners and decision makers considered effects of peat mining on areas not included in the prioritization analysis; zoning was not truly seen as a resource-allocation process and not emphasized in general minimizing ecological losses while satisfying economic needs (peat-mining potential); and decision makers based their prioritization of sites on site-level information showing high ecological value and on single legislative factors instead of finding a cost-effective landscape-level solution. We believe that if the zoning and decision-making processes are very complex, then the usefulness of science-based prioritization tools is likely to be reduced. Nevertheless, we found that high-end tools were useful in clearly exposing trade-offs between conservation and resource utilization. © 2017 Society for Conservation Biology.

  1. Planners to the rescue: spatial planning facilitating the development of offshore wind energy.

    PubMed

    Jay, Stephen

    2010-04-01

    The development of offshore wind energy has started to take place surprisingly quickly, especially in North European waters. This has taken the wind energy industry out of the territory of planning systems that usually govern the siting of wind farms on land, and into the world of departmental, sectoral regulation of marine activities. Although this has favoured the expansion of offshore wind energy in some respects, evidence suggests that the practice and principles of spatial planning can make an important contribution to the proper consideration of proposals for offshore wind arrays. This is especially so when a strategic planning process is put in place for marine areas, in which offshore wind is treated as part of the overall configuration of marine interests, so that adjustments can be made in the interests of wind energy. The current process of marine planning in the Netherlands is described as an illustration of this. (c) 2009 Elsevier Ltd. All rights reserved.

  2. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings,more » and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.« less

  3. Digital Database of Selected Aggregate and Related Resources in Ada, Boise, Canyon, Elmore, Gem, and Owyhee Counties, Southwestern Idaho

    USGS Publications Warehouse

    Moyle, Phillip R.; Wallis, John C.; Bliss, James D.; Bolm, Karen D.

    2004-01-01

    The U.S. Geological Survey (USGS) compiled a database of aggregate sites and geotechnical sample data for six counties - Ada, Boise, Canyon, Elmore, Gem, and Owyhee - in southwest Idaho as part of a series of studies in support of the Bureau of Land Management (BLM) planning process. Emphasis is placed on sand and gravel sites in deposits of the Boise River, Snake River, and other fluvial systems and in Neogene lacustrine deposits. Data were collected primarily from unpublished Idaho Transportation Department (ITD) records and BLM site descriptions, published Army Corps of Engineers (ACE) records, and USGS sampling data. The results of this study provides important information needed by land-use planners and resource managers, particularly in the BLM, to anticipate and plan for demand and development of sand and gravel and other mineral material resources on public lands in response to the urban growth in southwestern Idaho.

  4. Achieving full connectivity of sites in the multiperiod reserve network design problem

    USGS Publications Warehouse

    Jafari, Nahid; Nuse, Bryan L.; Moore, Clinton; Dilkina, Bistra; Hepinstall-Cymerman, Jeffrey

    2017-01-01

    The conservation reserve design problem is a challenge to solve because of the spatial and temporal nature of the problem, uncertainties in the decision process, and the possibility of alternative conservation actions for any given land parcel. Conservation agencies tasked with reserve design may benefit from a dynamic decision system that provides tactical guidance for short-term decision opportunities while maintaining focus on a long-term objective of assembling the best set of protected areas possible. To plan cost-effective conservation over time under time-varying action costs and budget, we propose a multi-period mixed integer programming model for the budget-constrained selection of fully connected sites. The objective is to maximize a summed conservation value over all network parcels at the end of the planning horizon. The originality of this work is in achieving full spatial connectivity of the selected sites during the schedule of conservation actions.

  5. Data Management Facility Operations Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keck, Nicole N

    2014-06-30

    The Data Management Facility (DMF) is the data center that houses several critical Atmospheric Radiation Measurement (ARM) Climate Research Facility services, including first-level data processing for the ARM Mobile Facilities (AMFs), Eastern North Atlantic (ENA), North Slope of Alaska (NSA), Southern Great Plains (SGP), and Tropical Western Pacific (TWP) sites, as well as Value-Added Product (VAP) processing, development systems, and other network services.

  6. Using Process and Inqury to Teach Content: Projectile Motion and Graphing

    ERIC Educational Resources Information Center

    Rhea, Marilyn; Lucido, Patricia; Gregerson-Malm, Cheryl

    2005-01-01

    These series of lessons uses the process of student inquiry to teach the concepts of force and motion identified in the National Science Education Standards for grades 5-8. The lesson plan also uses technology as a teaching tool through the use of interactive Web sites. The lessons are built on the 5-E format and feature imbedded assessments.

  7. Improving Usage Statistics Processing for a Library Consortium: The Virtual Library of Virginia's Experience

    ERIC Educational Resources Information Center

    Matthews, Tansy E.

    2009-01-01

    This article describes the development of the Virtual Library of Virginia (VIVA). The VIVA statistics-processing system remains a work in progress. Member libraries will benefit from the ability to obtain the actual data from the VIVA site, rather than just the summaries, so a project to make these data available is currently being planned. The…

  8. Development of a requirements management system for technical decision - making processes in the geological disposal project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hiroyoshi Ueda; Katsuhiko Ishiguro; Kazumi Kitayama

    2007-07-01

    NUMO (Nuclear Waste Management Organization of Japan) has a responsibility for implementing geological disposal of vitrified HLW (High-Level radioactive Waste) in the Japanese nuclear waste management programme. Its staged siting procedure was initiated in 2002 by an open call for volunteer sites. Careful management strategy and methodology for the technical decision-making at every milestone are required to prepare for the volunteer site application and the site investigation stages after that. The formal Requirement Management System (RMS) is planned to support the computerized implementation of the specific management methodology, termed the NUMO Structured Approach (NSA). This planned RMS will help formore » comprehensive management of the decision-making processes in the geological disposal project, change management towards the anticipated project deviations, efficient project driving such as well programmed R and D etc. and structured record-keeping regarding the past decisions, which leads to soundness of the project in terms of the long-term continuity. The system should have handling/management functions for the database including the decisions/requirements in the project in consideration, their associated information and the structures composed of them in every decision-making process. The information relating to the premises, boundary conditions and time plan of the project should also be prepared in the system. Effective user interface and efficient operation on the in-house network are necessary. As a living system for the long-term formal use, flexibility to updating is indispensable. In advance of the formal system development, two-year activity to develop the preliminary RMS was already started. The purpose of this preliminary system is to template the decision/requirement structure, prototype the decision making management and thus show the feasibility of the innovative RMS. The paper describes the current status of the development, focusing on the initial stage including work analysis/modeling and the system conceptualization. (authors)« less

  9. Multicriteria relocation analysis of an off-site radioactive monitoring network for a nuclear power plant.

    PubMed

    Chang, Ni-Bin; Ning, Shu-Kuang; Chen, Jen-Chang

    2006-08-01

    Due to increasing environmental consciousness in most countries, every utility that owns a commercial nuclear power plant has been required to have both an on-site and off-site emergency response plan since the 1980s. A radiation monitoring network, viewed as part of the emergency response plan, can provide information regarding the radiation dosage emitted from a nuclear power plant in a regular operational period and/or abnormal measurements in an emergency event. Such monitoring information might help field operators and decision-makers to provide accurate responses or make decisions to protect the public health and safety. This study aims to conduct an integrated simulation and optimization analysis looking for the relocation strategy of a long-term regular off-site monitoring network at a nuclear power plant. The planning goal is to downsize the current monitoring network but maintain its monitoring capacity as much as possible. The monitoring sensors considered in this study include the thermoluminescence dosimetry (TLD) and air sampling system (AP) simultaneously. It is designed for detecting the radionuclide accumulative concentration, the frequency of violation, and the possible population affected by a long-term impact in the surrounding area regularly while it can also be used in an accidental release event. With the aid of the calibrated Industrial Source Complex-Plume Rise Model Enhancements (ISC-PRIME) simulation model to track down the possible radionuclide diffusion, dispersion, transport, and transformation process in the atmospheric environment, a multiobjective evaluation process can be applied to achieve the screening of monitoring stations for the nuclear power plant located at Hengchun Peninsula, South Taiwan. To account for multiple objectives, this study calculated preference weights to linearly combine objective functions leading to decision-making with exposure assessment in an optimization context. Final suggestions should be useful for narrowing the set of scenarios that decision-makers need to consider in this relocation process.

  10. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  11. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less

  12. Dynamic Disturbance Processes Create Dynamic Lek Site Selection in a Prairie Grouse.

    PubMed

    Hovick, Torre J; Allred, Brady W; Elmore, R Dwayne; Fuhlendorf, Samuel D; Hamilton, Robert G; Breland, Amber

    2015-01-01

    It is well understood that landscape processes can affect habitat selection patterns, movements, and species persistence. These selection patterns may be altered or even eliminated as a result of changes in disturbance regimes and a concomitant management focus on uniform, moderate disturbance across landscapes. To assess how restored landscape heterogeneity influences habitat selection patterns, we examined 21 years (1991, 1993-2012) of Greater Prairie-Chicken (Tympanuchus cupido) lek location data in tallgrass prairie with restored fire and grazing processes. Our study took place at The Nature Conservancy's Tallgrass Prairie Preserve located at the southern extent of Flint Hills in northeastern Oklahoma. We specifically addressed stability of lek locations in the context of the fire-grazing interaction, and the environmental factors influencing lek locations. We found that lek locations were dynamic in a landscape with interacting fire and grazing. While previous conservation efforts have treated leks as stable with high site fidelity in static landscapes, a majority of lek locations in our study (i.e., 65%) moved by nearly one kilometer on an annual basis in this dynamic setting. Lek sites were in elevated areas with low tree cover and low road density. Additionally, lek site selection was influenced by an interaction of fire and patch edge, indicating that in recently burned patches, leks were located near patch edges. These results suggest that dynamic and interactive processes such as fire and grazing that restore heterogeneity to grasslands do influence habitat selection patterns in prairie grouse, a phenomenon that is likely to apply throughout the Greater Prairie-Chicken's distribution when dynamic processes are restored. As conservation moves toward restoring dynamic historic disturbance patterns, it will be important that siting and planning of anthropogenic structures (e.g., wind energy, oil and gas) and management plans not view lek locations as static points, but rather as sites that shift around the landscape in response to shifting vegetation structure. Acknowledging shifting lek locations in these landscapes will help ensure conservation efforts are successful by targeting the appropriate areas for protection and management.

  13. Energy conserving site design case study: Shenandoah, Georgia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as amore » passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)« less

  14. Application of science-based restoration planning to a desert river system.

    PubMed

    Laub, Brian G; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  15. Application of Science-Based Restoration Planning to a Desert River System

    NASA Astrophysics Data System (ADS)

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-06-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  16. Application of science-based restoration planning to a desert river system

    USGS Publications Warehouse

    Laub, Brian G.; Jimenez, Justin; Budy, Phaedra

    2015-01-01

    Persistence of many desert river species is threatened by a suite of impacts linked to water infrastructure projects that provide human water security where water is scarce. Many desert rivers have undergone regime shifts from spatially and temporally dynamic ecosystems to more stable systems dominated by homogenous physical habitat. Restoration of desert river systems could aid in biodiversity conservation, but poses formidable challenges due to multiple threats and the infeasibility of recovery to pre-development conditions. The challenges faced in restoring desert rivers can be addressed by incorporating scientific recommendations into restoration planning efforts at multiple stages, as demonstrated here through an example restoration project. In particular, use of a watershed-scale planning process can identify data gaps and irreversible constraints, which aid in developing achievable restoration goals and objectives. Site-prioritization focuses limited the resources for restoration on areas with the greatest potential to improve populations of target organisms. Investment in research to understand causes of degradation, coupled with adoption of a guiding vision is critical for identifying feasible restoration actions that can enhance river processes. Setting monitoring as a project goal, developing hypotheses for expected outcomes, and implementing restoration as an experimental design will facilitate adaptive management and learning from project implementation. Involvement of scientists and managers during all planning stages is critical for developing process-based restoration actions and an implementation plan to maximize learning. The planning process developed here provides a roadmap for use of scientific recommendations in future efforts to recover dynamic processes in imperiled riverine ecosystems.

  17. Land Use Management for Solid Waste Programs

    ERIC Educational Resources Information Center

    Brown, Sanford M., Jr.

    1974-01-01

    The author discusses the problems of solid waste disposal and examines various land use management techniques. These include the land use plan, zoning, regionalization, land utilities, and interim use. Information concerning solid waste processing site zoning and analysis is given. Bibliography included. (MA)

  18. SU-E-T-106: An Institutional Review of Using Commercially Available Software to Evaluate Treatment Plan Quality for Various Treatment Sites and Beam Deliveries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esquivel, C; Patton, L; Walker, S

    Purpose: Use Sun Nuclear Quality Reports™ with PlanIQ™ to evaluate different treatment delivery techniques for various treatment sites. Methods: Fifteen random patients with different treatment sites were evaluated. These include the Head/Neck, prostate, pelvis, lung, esophagus, axilla, bladder and abdomen. Initially, these sites were planned on the Pinnacle {sup 3} V9.6 treatment planning system and utilized nine 6MV step-n-shoot IMRT fields. The RT plan, dose and structure sets were sent to Quality Reports™ where a DVH was recreated and the plans were compared to a unique Plan Algorithm for each treatment site. Each algorithm has its own plan quality metricsmore » and objectives, which include the PTV coverage, PTV maximum dose, the prescription dose outside the target, doses to the critical structures, and the global maximum dose and its location. Each plan was scored base on meeting each objective. Plans may have been reoptimized and reevaluated with Quality Reports™ based on the initial score. PlanIQ™ was used to evaluate if any objective not met was achievable or difficult to obtain. A second plan using VMAT delivery was created for each patient and scored with Quality Reports™. Results: There were a wide range of scores for the different treatment sites with some scoring better for IMRT plans and some better for the VMAT deliveries. The variation in the scores could be attributed to the treatment site, location, and shape of the target. Most deliveries were chosen for the VMAT due to the short treatment times and quick patient throughput with acceptable plan scores. Conclusion: The tools are provided for both physician and dosimetrist to objectively evaluate the use of VMAT delivery versus the step-n-shoot IMRT delivery for various sites. PlanIQ validates if objectives can be met. For the physicist, a concise pass/fail report is created for plan evaluation.« less

  19. Restoring public trust while tearing down site in rural Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, Jerry; Wagner, Jeffrey; Connell, Judy

    2007-07-01

    In the mid-1980's, the impact of three decades of uranium processing near rural Fernald, Ohio, 18 miles northwest of Cincinnati, became the centre of national public controversy. When a series of incidents at the uranium foundry brought to light the years of contamination to the environment and surrounding farmland communities, local citizens' groups united and demanded a role in determining the plans for cleaning up the site. One citizens' group, Fernald Residents for Environmental Safety and Health (FRESH), formed in 1984 following reports that nearly 300 pounds of enriched uranium oxide had been released from a dust-collector system, and threemore » off-property wells south of the site were contaminated with uranium. For 22 years, FRESH monitored activities at Fernald and participated in the decision-making process with management and regulators. The job of FRESH ended on 19 January this year when the Fernald Site was declared clean of all nuclear contamination and open to public access. It marked the end of a remarkable turnaround in public confidence and trust that had attracted critical reports from around the world. When personnel from Fluor arrived in 1992, the management team thought it understood the issues and concerns of each stakeholder group, and was determined to implement the decommissioning scope of work aggressively, confident that stakeholders would agree with its plans. This approach resulted in strained relationships with opinion leaders during the early months of Fluor's contract. To forge better relationships, the U.S. Department of Energy (DOE) who owns the site, and Fluor embarked on three new strategies based on engaging citizens and interested stakeholder groups in the decision-making process. The first strategy was opening communication channels with site leadership, technical staff, and regulators. This strategy combined a strong public-information program with two-way communications between management and the community, soliciting and encouraging stakeholder participation early in the decision-making process. Fluor's public-participation strategy exceeded the 'check-the-box' approach common within the nuclear-weapons complex, and set a national standard that stands alone today. The second stakeholder-engagement strategy sprang from mending fences with the regulators and the community. The approach for disposing low-level waste was a 25-year plan to ship it off the site. Working with stakeholders, DOE and Fluor were able to convince the community to accept a plan to safely store waste permanently on site, which would save 15 years of cleanup and millions of dollars in cost. The third strategy addressed the potentially long delays in finalizing remedial action plans due to formal public comment periods and State and Federal regulatory approvals. Working closely with the U.S. and Ohio Environmental Protection Agencies (EPA) and other stakeholders, DOE and Fluor were able to secure approvals of five Records of Decision on time - a first for the DOE complex. Developing open and honest relationships with union leaders, the workforce, regulators and community groups played a major role in DOE and Fluor cleaning up and closing the site. Using lessons learned at Fernald, DOE was able to resolve challenges at other sites, including worker transition, labour disputes, and damaged relationships with regulators and the community. It took significant time early in the project to convince the workforce that their future lay in cleanup, not in holding out hope for production to resume. It took more time to repair relationships with Ohio regulators and the local community. Developing these relationships over the years required constant, open communications between site decision makers and stakeholders to identify issues and to overcome potential barriers. Fluor's open public-participation strategy resulted in stakeholder consensus of five remedial-action plans that directed Fernald cleanup. This strategy included establishing a public-participation program that emphasized a shared-decision making process and abandoned the government's traditional, non-participatory 'Decide, Announce, Defend' approach. Fernald's program became a model within the DOE complex for effective public participation. Fluor led the formation of the first DOE site-specific advisory board dedicated to remediation and closure. The board was successful at building consensus on critical issues affecting long-term site remediation, such as cleanup levels, waste disposal and final land use. Fluor created innovative public outreach tools, such as 'Cleanopoly', based on the Monopoly game, to help illustrate complex concepts, including risk levels, remediation techniques, and associated costs. These innovative tools helped DOE and Fluor gain stakeholder consensus on all cleanup plans. To commemorate the outstanding commitment of Fernald stakeholders to this massive environmental-restoration project, Fluor donated $20,000 to build the Weapons to Wetlands Grove overlooking the former 136-acre production area. The grove contains 24 trees, each dedicated to '[a] leader(s) behind the Fernald cleanup'. Over the years, Fluor, through the Fluor Foundation, also invested in educational and humanitarian projects, contributing nearly $2 million to communities in southwestern Ohio, Kentucky and Indiana. Further, to help offset the economic impact of the site's closing to the community, DOE and Fluor promoted economic development in the region by donating excess equipment and property to local schools and townships. This paper discusses the details of the public-involvement program - from inception through maturity - and presents some lessons learned that can be applied to other similar projects. (authors)« less

  20. National Register of Historic Places multiple property documentation form -- Historic, archaeological, and traditional cultural properties of the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nickens, P.R.

    The US Department of Energy`s Hanford Site encompasses an area of 560 square miles on the Columbia River in southeastern Washington. Since 1943, the Hanford Site has existed as a protected area for activities primarily related to the production of radioactive materials for national defense uses. For cultural resources on the Hanford Site, establishment of the nuclear reservation as a high security area, with public access restricted, has resulted in a well-protected status, although no deliberate resource protection measures were in effect to mitigate effects of facilities construction and associated activities. Thus, the Hanford Site contains an extensive record ofmore » aboriginal archaeological sites and Native American cultural properties, along with pre-Hanford Euro-American sites (primarily archaeological in nature with the removal of most pre-1943 structures), and a considerable number of Manhattan Project/Cold War era buildings and structures. The recent mission change from production to clean up and disposal of DOE lands created a critical need for development and implementation of new and different cultural resource management strategies. DOE-RL has undertaken a preservation planning effort for the Hanford Site. The intent of this Plan is to enable DOE-RL to organize data and develop goals, objectives, and priorities for the identification, evaluation, registration, protection, preservation, and enhancement of the Site`s historical and cultural properties. Decisions made about the identification, evaluation, registration and treatment of historic properties are most aptly made when relationships between individual properties and other similar properties are considered. The historic context and the multiple property documentation (NTD) process provides DOE-RL the organizational framework for these decisions. Once significant patterns are identified, contexts developed, and expected properties are defined, the NTD process provides the foundation for future decisions concerning the management of significant cultural resources on the Hanford Site.« less

  1. Solid waste management complex site development plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  2. Current Status and Future Plans of the NEON Airborne Observation Platform (AOP): Data Products, Observatory Requirements and Opportunities for the Community

    NASA Astrophysics Data System (ADS)

    Petroy, S. B.; Leisso, N.; Goulden, T.; Gulbransen, T.

    2016-12-01

    The National Ecological Observatory Network (NEON) is a continental-scale ecological observation platform designed to collect and disseminate data that contributes to understanding and forecasting the impacts of climate change, land use change, and invasive species on ecology. NEON will collect in-situ and airborne data over 81 sites across the US, including Alaska, Hawaii, and Puerto Rico. The Airborne Observation Platform (AOP) group within the NEON project operates a payload suite that includes a waveform LiDAR, imaging spectrometer (NIS) and high resolution RGB camera. Data from this sensor suite will be collected annually over each site and processed into a set of standard data products, generally following the processing levels used by NASA (Level 1 through Level 3). We will present a summary of the first operational flight campaign (2016), where AOP flew 42 of the 81 planned NEON sites, our operational plans for 2017, and how we will ramp up to full operations by 2018. We will also describe the final set of AOP data products to be delivered as part of NEON construction and those field (observational) data products collected concurrently on the ground, that may be used to support validation efforts of algorithms for deriving vegetation characteristics from airborne data (e.g. Plant foliar physical/chemical properties, Digital Hemispherical Photos, Plant Diversity, etc.). Opportunities for future enhancements to data products or algorithms will be facilitated via NEON's cyberinfrastructure, which is designed to support wrapping/integration of externally-developed code. And finally, we will present NEON's plans for the third AOP Sensor Suite as an assignable asset and the intent of NSF to provide research opportunities to the community for developing higher level AOP data products that were removed from the NEON project in 2015.

  3. Ion beams in radiotherapy - from tracks to treatment planning

    NASA Astrophysics Data System (ADS)

    Krämer, M.; Scifoni, E.; Wälzlein, C.; Durante, M.

    2012-07-01

    Several dozen clinical sites around the world apply beams of fast light ions for radiotherapeutical purposes. Thus there is a vested interest in the various physical and radiobiological processes governing the interaction of ion beams with matter, specifically living systems. We discuss the various modelling steps which lead from basic interactions to the application in actual patient treatment planning. The nano- and microscopic scale is covered by sample calculations with our TRAX code. On the macroscopic scale we feature the TRiP98 treatment planning system, which was clinically used in GSI's radiotherapy pilot project.

  4. Proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.« less

  5. Successful implementation of image-guided radiation therapy quality assurance in the Trans Tasman Radiation Oncology Group 08.01 PROFIT Study.

    PubMed

    Middleton, Mark; Frantzis, Jim; Healy, Brendan; Jones, Mark; Murry, Rebecca; Kron, Tomas; Plank, Ashley; Catton, Charles; Martin, Jarad

    2011-12-01

    The quality assurance (QA) of image-guided radiation therapy (IGRT) within clinical trials is in its infancy, but its importance will continue to grow as IGRT becomes the standard of care. The purpose of this study was to demonstrate the feasibility of IGRT QA as part of the credentialing process for a clinical trial. As part of the accreditation process for a randomized trial in prostate cancer hypofraction, IGRT benchmarking across multiple sites was incorporated. Each participating site underwent IGRT credentialing via a site visit. In all centers, intraprostatic fiducials were used. A real-time assessment of analysis of IGRT was performed using Varian's Offline Review image analysis package. Two-dimensional (2D) kV and MV electronic portal imaging prostate patient datasets were used, consisting of 39 treatment verification images for 2D/2D comparison with the digitally reconstructed radiograph derived from the planning scan. The influence of differing sites, image modality, and observer experience on IGRT was then assessed. Statistical analysis of the mean mismatch errors showed that IGRT analysis was performed uniformly regardless of institution, therapist seniority, or imaging modality across the three orthogonal planes. The IGRT component of clinical trials that include sophisticated planning and treatment protocols must undergo stringent QA. The IGRT technique of intraprostatic fiducials has been shown in the context of this trial to be undertaken in a uniform manner across Australia. Extending this concept to many sites with different equipment and IGRT experience will require a robust remote credentialing process. Crown Copyright © 2011. Published by Elsevier Inc. All rights reserved.

  6. Solid Waste Landfill Site Selection in the Sense of Environment Sensitive Sustainable Urbanization: Izmir, Turkey Case

    NASA Astrophysics Data System (ADS)

    TÜdeş, Şule; Kumlu, Kadriye Burcu Yavuz

    2017-10-01

    Each stage of the planning process should be based on the natural resource protection, in the sense of environmental sensitive and sustainable urban planning. Values, which are vital for the continuity of the life in the Earth, as soil, water, forest etc. should be protected from the undesired effects of the pollution and the other effects caused by the high urbanization levels. In this context, GIS-MCDM based solid waste landfill site selection is applied for Izmir, Turkey, where is a significant attraction place for tourism. As Multi criteria Decision Making (MCDM) technique, Analytical Hierarchy Process (AHP) is used. In this study, geological, tectonically and hydrological data, as well as agricultural land use, slope, distance to the settlement areas and the highways are used as inputs for AHP analysis. In the analysis stage, those inputs are rated and weighted. The weighted criteria are evaluated via GIS, by using weighted overlay tool. Therefore, an upper-scale analysis is conducted and a map, which shows the alternative places for the solid waste landfill sites, considering the environmental protection and evaluated in the context of environmental and urban criteria, are obtained.

  7. 1. Statement of significance, site plan, plan, elevation, section, boxcar ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Statement of significance, site plan, plan, elevation, section, boxcar spring details, and outhouse plan and elevation. - Woods Landing Dance Hall, 2731 State Highway 230, Woods Landing, Albany County, WY

  8. Strategies for bird conservation: The Partners in Flight planning process; Proceedings of the 3rd Partners in Flight Workshop; 1995 October 1-5; Cape May, NJ

    Treesearch

    Rick Bonney; David N. Pashley; Robert J. Cooper; Larry Niles

    2000-01-01

    This volume represents a compilation of papers presented at the 3rd International Partners in Flight Workshop held October 1-5, 1995, at the Grand Hotel in Cape May, NJ. The title of the workshop was "Partners in Flight Conservation Plan: Building Consensus for Action." Manuscripts have been available on-line at the Cornell Laboratory of Ornithology web site...

  9. TRU Waste Management Program cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementationmore » would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)« less

  10. Field-based ET calibration and validation sites in interior Alaska: Preparatory Science for NASA's planned HyspIRI Mission

    NASA Astrophysics Data System (ADS)

    Prakash, A.; Cristobal, J.; Fochesatto, G. J.; Starkenburg, D. P.; Kane, D. L.; Gens, R.; Alfieri, J. G.; Irving, K.; Anderson, M. C.; Kustas, W.

    2012-12-01

    Evapotranspiration (ET) is a critical component of the hydrologic cycle in interior Alaska, being about 74% of summer precipitation or 50% of annual precipitation, and is a process that will become more important as we witness increasing trends of climate warming, permafrost degradation, forest fire occurrences, and significant land cover changes. In preparation for NASA's planned Hyperspectral Infrared Imager (HyspIRI) satellite mission; we have established two experimental sites in interior Alaska to measure representative ET values for typical boreal forest in this region as a basis to estimate and upscale ET from remote sensing solar and thermal data. The first site (University of Alaska Fairbanks, UAF, north campus) is located in a needleleaf forest mainly composed of black spruce (Picea mariana) and the second site (Caribou-Poker Creek Research Watershed) is in a deciduous forest mainly composed of paper birch (Betula papyrifera). Both field sites are equipped with sonic anemometers and gas analyzers at 24 m height operating at a 20Hz sampling rate, and, additionally, the UAF north campus site includes a 3 and 12m sonic anemometers. At 24m, the tower is also equipped with a four component net radiometer sensor and air temperature and pressure sensors are installed at different heights. To monitor ground heat, temperature and soil moisture sensors as well as heat flux plates have also been installed in the organic and the subsurface soil layers. Additionally, a Large Aperture Scintillometer (LAS) transmitter and receiver units with a separation of 1.2 km have been installed across the tower ensuring a beam height of 24m. Data is recorded on data loggers and downloaded for quality check and processing on a weekly basis. Further details of tower set-up are available at www.et.alaska.edu. Data from the field instruments are presented and their use for Alaska specific ET model calibration are discussed. The field set-up provides all input data for ET modeling and for boundary layer micrometeorological research and the field-sites have also potential to benefit CalVal activities for other planned missions such us SMAP, Sentinel series, and EnMap.

  11. An Analog Rover Exploration Mission for Education and Outreach

    NASA Astrophysics Data System (ADS)

    Moores, John; Campbell, Charissa L.; Smith, Christina L.; Cooper, Brittney A.

    2017-10-01

    This abstract describes an analog rover exploration mission designed as an outreach program for high school and undergraduate students. This program is used to teach them about basic mission control operations, how to manage a rover as if it were on another planetary body, and employing the rover remotely to complete mission objectives. One iteration of this program has been completed and another is underway. In both trials, participants were shown the different operation processes involved in a real-life mission. Modifications were made to these processes to decrease complexity and better simulate a mission control environment in a short time period (three 20-minute-long mission “days”). In the first run of the program, participants selected a landing site, what instruments would be on the rover - subject to cost, size, and weight limitations - and were randomly assigned one of six different mission operations roles, each with specific responsibilities. For example, a Science Planner/Integrator (SPI) would plan science activities whilst a Rover Engineer (RE) would keep on top of rover constraints. Planning consisted of a series of four meetings to develop and verify the current plan, pre-plan the next day's activities and uplink the activities to the “rover” (a human colleague). Participants were required to attend certain meetings depending upon their assigned role. To conclude the mission, students viewed the site to understand any differences between remote viewing and reality in relation to the rover. Another mission is currently in progress with revisions from the earlier run to improve the experience. This includes broader roles and meetings and pre-selecting the landing site and rover. The new roles are: Mission Lead, Rover Engineer and Science Planner. The SPI role was previously popular so most of the students were placed in this category. The meetings were reduced to three but extended in length. We are also planning to integrate this program into the Ontario Science Center (OSC) to educate and fascinate people of all ages.

  12. FlyAR: augmented reality supported micro aerial vehicle navigation.

    PubMed

    Zollmann, Stefanie; Hoppe, Christof; Langlotz, Tobias; Reitmayr, Gerhard

    2014-04-01

    Micro aerial vehicles equipped with high-resolution cameras can be used to create aerial reconstructions of an area of interest. In that context automatic flight path planning and autonomous flying is often applied but so far cannot fully replace the human in the loop, supervising the flight on-site to assure that there are no collisions with obstacles. Unfortunately, this workflow yields several issues, such as the need to mentally transfer the aerial vehicle’s position between 2D map positions and the physical environment, and the complicated depth perception of objects flying in the distance. Augmented Reality can address these issues by bringing the flight planning process on-site and visualizing the spatial relationship between the planned or current positions of the vehicle and the physical environment. In this paper, we present Augmented Reality supported navigation and flight planning of micro aerial vehicles by augmenting the user’s view with relevant information for flight planning and live feedback for flight supervision. Furthermore, we introduce additional depth hints supporting the user in understanding the spatial relationship of virtual waypoints in the physical world and investigate the effect of these visualization techniques on the spatial understanding.

  13. 23 CFR 777.9 - Mitigation of impacts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...

  14. 23 CFR 777.9 - Mitigation of impacts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...

  15. Beneficial Use of Drilling Waste - A Wetland Restoration Technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pioneer Natural Resources

    2000-08-14

    This project demonstrated that treated drill cuttings derived from oil and gas operations could be used as source material for rebuilding eroding wetlands in Louisiana. Planning to supply a restoration site, drill a source well, and provide part of the funding. Scientists from southeastern Louisiana University's (SLU) Wetland Biology Department were contracted to conduct the proposed field research and to perform mesocosm studies on the SLU campus. Plans were to use and abandoned open water drill slip as a restoration site. Dredged material was to be used to create berms to form an isolated cell that would then be filledmore » with a blend of dredged material and drill cuttings. Three elevations were used to test the substrates ability to support various alternative types of marsh vegetation, i.e., submergent, emergent, and upland. The drill cuttings were not raw cuttings, but were treated by either a dewatering process (performed by Cameron, Inc.) or by a stabilization process to encapsulate undesirable constituents (performed by SWACO, Division of Smith International).« less

  16. Vadose zone transport field study: Detailed test plan for simulated leak tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    AL Ward; GW Gee

    2000-06-23

    The US Department of Energy (DOE) Groundwater/Vadose Zone Integration Project Science and Technology initiative was created in FY 1999 to reduce the uncertainty associated with vadose zone transport processes beneath waste sites at DOE's Hanford Site near Richland, Washington. This information is needed not only to evaluate the risks from transport, but also to support the adoption of measures for minimizing impacts to the groundwater and surrounding environment. The principal uncertainties in vadose zone transport are the current distribution of source contaminants and the natural heterogeneity of the soil in which the contaminants reside. Oversimplified conceptual models resulting from thesemore » uncertainties and limited use of hydrologic characterization and monitoring technologies have hampered the understanding contaminant migration through Hanford's vadose zone. Essential prerequisites for reducing vadose transport uncertainly include the development of accurate conceptual models and the development or adoption of monitoring techniques capable of delineating the current distributions of source contaminants and characterizing natural site heterogeneity. The Vadose Zone Transport Field Study (VZTFS) was conceived as part of the initiative to address the major uncertainties confronting vadose zone fate and transport predictions at the Hanford Site and to overcome the limitations of previous characterization attempts. Pacific Northwest National Laboratory (PNNL) is managing the VZTFS for DOE. The VZTFS will conduct field investigations that will improve the understanding of field-scale transport and lead to the development or identification of efficient and cost-effective characterization methods. Ideally, these methods will capture the extent of contaminant plumes using existing infrastructure (i.e., more than 1,300 steel-cased boreholes). The objectives of the VZTFS are to conduct controlled transport experiments at well-instrumented field sites at Hanford to: identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford's waste disposal sites; reduce uncertainty in conceptual models; develop a detailed and accurate database of hydraulic and transport parameters for validation of three-dimensional numerical models; identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. This plan provides details for conducting field tests during FY 2000 to accomplish these objectives. Details of additional testing during FY 2001 and FY 2002 will be developed as part of the work planning process implemented by the Integration Project.« less

  17. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less

  18. Assessing the representativeness of wind data for wind turbine site evaluation

    NASA Technical Reports Server (NTRS)

    Renne, D. S.; Corotis, R. B.

    1982-01-01

    Once potential wind turbine sites (either for single installations or clusters) are identified through siting procedures, actual evaluation of the sites must commence. This evaluation is needed to obtain estimates of wind turbine performance and to identify hazards to the machine from the turbulence component of the atmosphere. These estimates allow for more detailed project planning and for preliminary financing arrangements to be secured. The site evaluation process can occur in two stages: (1) utilizing existing nearby data, and (2) establishing and monitoring an onsite measurement program. Since step (2) requires a period of at least 1 yr or more from the time a potential site has been identified, step (1) is often an essential stage in the preliminary evaluation process. Both the methods that have been developed and the unknowns that still exist in assessing the representativeness of available data to a nearby wind turbine site are discussed. How the assessment of the representativeness of available data can be used to develop a more effective onsite meteorological measurement program is also discussed.

  19. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  20. On-site or off-site treatment of medical waste: a challenge

    PubMed Central

    2014-01-01

    Treating hazardous-infectious medical waste can be carried out on-site or off-site of health-care establishments. Nevertheless, the selection between on-site and off-site locations for treating medical waste sometimes is a controversial subject. Currently in Iran, due to policies of Health Ministry, the hospitals have selected on-site-treating method as the preferred treatment. The objectives of this study were to assess the current condition of on-site medical waste treatment facilities, compare on-site medical waste treatment facilities with off-site systems and find the best location of medical waste treatment. To assess the current on-site facilities, four provinces (and 40 active hospitals) were selected to participate in the survey. For comparison of on-site and off-site facilities (due to non availability of an installed off-site facility) Analytical Hierarchy Process (AHP) was employed. The result indicated that most on-site medical waste treating systems have problems in financing, planning, determining capacity of installations, operation and maintenance. AHP synthesis (with inconsistency ratio of 0.01 < 0.1) revealed that, in total, the off-site treatment of medical waste was in much higher priority than the on-site treatment (64.1% versus 35.9%). According to the results of study it was concluded that the off-site central treatment can be considered as an alternative. An amendment could be made to Iran’s current medical waste regulations to have infectious-hazardous waste sent to a central off-site installation for treatment. To begin and test this plan and also receive the official approval, a central off-site can be put into practice, at least as a pilot in one province. Next, if it was practically successful, it could be expanded to other provinces and cities. PMID:24739145

  1. Library Web Site Administration: A Strategic Planning Model For the Smaller Academic Library

    ERIC Educational Resources Information Center

    Ryan, Susan M.

    2003-01-01

    Strategic planning provides a useful structure for creating and implementing library web sites. The planned integration of a library's web site into its mission and objectives ensures that the library's community of users will consider the web site one of the most important information tools the library offers.

  2. Ferrocyanide Safety Program. Quarterly report for the period ending March 31, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meacham, J.E.; Cash, R.J.; Dukelow, G.T.

    1994-04-01

    Various high-level radioactive waste from defense operations has accumulated at the Hanford Site in underground storage tanks since the mid-1940s. During the 1950s, additional tank storage space was required to support the defense mission. To obtain this additional storage volume within a short time period, and to minimize the need for constructing additional storage tanks, Hanford Site scientists developed a process to scavenge {sup 137}Cs from tank waste liquids. In implementing this process, approximately 140 metric tons of ferrocyanide were added to waste that was later routed to some Hanford Site single-shell tanks. The reactive nature of ferrocyanide in themore » presence of an oxidizer has been known for decades, but the conditions under which the compound can undergo endothermic and exothermic reactions have not been thoroughly studied. Because the scavenging process precipitated ferrocyanide from solutions containing nitrate and nitrite, an intimate mixture of ferrocyanides and nitrates and/or nitrites is likely to exist in some regions of the ferrocyanide tanks. This quarterly report provides a status of the activities underway at the Hanford Site on the Ferrocyanide Safety Issue, as requested by the Defense Nuclear Facilities Safety Board (DNFSB) in their Recommendation 90-7. A revised Ferrocyanide Safety Program Plan addressing the total Ferrocyanide Safety Program, including the six parts of DNFSB Recommendation 90-7, was recently prepared and released in March 1994. Activities in the revised program plan are underway or have been completed, and the status of each is described in Section 4.0 of this report.« less

  3. Evaluation of site plan review procedures.

    DOT National Transportation Integrated Search

    1988-01-01

    The site plan review procedures of the Virginia Department of Transportation (VDOT) were evaluated. The objectives of the evaluation were to recommend (1) a set of site plan review procedures including a checklist, (2) definitions of the roles and re...

  4. Selecting reasonable future land use scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allred, W.E.; Smith, R.W.

    1995-12-31

    This paper examines a process to help select the most reasonable future land use scenarios for hazardous waste and/or low-level radioactive waste disposal sites. The process involves evaluating future land use scenarios by applying selected criteria currently used by commercial mortgage companies to determine the feasibility of obtaining a loan for purchasing such land. The basis for the process is that only land use activities for which a loan can be obtained will be considered. To examine the process, a low-level radioactive waste site, the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory, is used as an example.more » The authors suggest that the process is a very precise, comprehensive, and systematic (common sense) approach for determining reasonable future use of land. Implementing such a process will help enhance the planning, decisionmaking, safe management, and cleanup of present and future disposal facilities.« less

  5. Savannah River Site nuclear materials management plan FY 2017-2031

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, V.

    The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less

  6. Photographic copy of site plan for proposed Test Stand "D" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of site plan for proposed Test Stand "D" in 1958. The contemporary site plans of test stands "A," "B," and "C" are also visible, along with the interconnecting tunnel system. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering "Site Plan for Proposed Test Stand "D" - Edwards Test Station," drawing no. ESP/22-0, 14 November 1958 - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  7. Building capacity in nursing: creating a leadership institute.

    PubMed

    Simpson, Beverley; Skelton-Green, Judith; Scott, Julia J; O'Brien-Pallas, Linda

    2002-01-01

    The authors describe the development of the Dorothy M. Wylie Nursing Leadership Institute, an innovative partnership of the Nursing Effectiveness, Outcomes and Utilization Research Unit at the University of Toronto site and nurse consultants with expertise in organizational and human resource development. The context for the initiative, needs and rationale, supporting literature and the coalition-building and planning activities are outlined. The program and its conceptual underpinnings, creation of a learning community, participant profiles, evaluation processes and future plans are described.

  8. SEACIONS During the 2012 Asian Monsoon: A Strategic Approach to Determining Convective Impacts on Tropospheric Ozone and TTL Gravity Waves

    NASA Technical Reports Server (NTRS)

    Thompson, Anne M. (Principal Investigator); Young, George S. (Principal Investigator); Morris, Gary; Johnson, Bryan; Oltmans, Samuel; Selkirk, Henry B.

    2016-01-01

    Purpose of making ozone and water vapor profiles measurements in SEAC4RS is to give consistent coverage of the vertical structure at fixed sites to (1) complement 2 campaign aircraft sampling; (2) ground-truth satellite measurements of H O and ozone; (3) provide profiles for model evaluation; (4) study processes responsible for day-to-day variability at each site. Revised objective for 2013, due to cancellation of the 2012 and 2013 plans to operate in Southeast Asia: rapidly re-configure the original "SEACIONS," Southeast Asian Consortium for Intensive Ozonesonde Network Study, to a SouthEast American plan (SEACIONS) for collecting daily ozonesonde data during DC-8 and ER-2 flights throughout the southeastern US. As in previous IONS (2004, 2006, 2008), students were trained at St Louis, Tallahassee, Houston, Penn State, Huntsville, Socorro. Images of the soundings and related flight-planning products were posted each day at NASA and Penn State (PSU) websites. With the aircraft based at Ellington Field (Houston), water CFH (cryogenic frost-point hygrometer) sondes in addition to ozonesondes, were to be taken launched at that site.

  9. Decision Support Model for Municipal Solid Waste Management at Department of Defense Installations.

    DTIC Science & Technology

    1995-12-01

    Huang uses "Grey Dynamic Programming for Waste Management Planning Under Uncertainty." Fuzzy Dynamic Programming (FDP) is usually designed to...and Composting Programs. Washington: Island Press, 1991. Junio, D.F. Development of an Analytical Hierarchy Process ( AHP ) Model for Siting of

  10. 76 FR 28925 - Tribal Veterans Cemetery Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... means the process of site selection, land acquisition, design and planning, earth moving, landscaping... space, or functional layout; and it will not enter into a construction contract for the project or... State or Tribal Organization and the design team to provide a standard for preparation of drawings...

  11. Restoring Western Ranges and Wildlands, vol. 2

    Treesearch

    Stephen B. Monsen; Richard Stevens; Nancy L. Shaw

    2004-01-01

    This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...

  12. Procedures manual for the determination of International Roughness Index on HPMs sites in Oregon : operations and calibration.

    DOT National Transportation Integrated Search

    1990-01-01

    The Oregon Department of Transportation (ODOT) is required to provide an annual measure of pavement condition based on International Roughness Index (IRI). The main coordination of this process with FHWA is done by the Highway Division's Planning Sec...

  13. Prairie Restoration for Wisconsin Schools.

    ERIC Educational Resources Information Center

    Murray, Molly Fifield; Greenler, Robin McC.

    This packet is composed of several resources for teachers interested in prairie ecology and restoration. "A Guide to Restoration from Site Analysis to Management" focuses on the Prairie/Oak Savanna communities of Wisconsin and takes teachers through the planning and design process for a restoration project on school grounds including…

  14. Restoring Western Ranges and Wildlands, vol. 3

    Treesearch

    Stephen B. Monsen; Richard Stevens; Nancy L. Shaw

    2004-01-01

    This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...

  15. Restoring Western Ranges and Wildlands, vol. 1

    Treesearch

    Stephen B. Monsen; Richard Stevens; Nancy L. Shaw

    2004-01-01

    This work, in three volumes, provides background on philosophy, processes, plant materials selection, site preparation, and seed and seeding equipment for revegetating disturbed rangelands, emphasizing use of native species. The 29 chapters include guidelines for planning, conducting, and managing, and contain a compilation of rangeland revegetation research conducted...

  16. NPL-PAD (National Priorities List Publication Assistance Database) for Region 7

    EPA Pesticide Factsheets

    THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for the National Priorities List (NPL) Publication Assistance Databsae (PAD), a Lotus Notes application that holds Region 7's universe of NPL site information such as site description, threats and contaminants, cleanup approach, environmental process, community involvement, site repository, and regional contacts. This database used to be updated annually, at different times for different NPLs, but it is currently no longer being used. This work fell under objectives for EPA's 2003-2008 Strategic Plan (Goal 3) for Land Preservation & Restoration, which are to clean up and reuse contaminated land.

  17. Conceptual Site Treatment Plan Laboratory for Energy-Related Health Research Environmental Restoration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, T.E.

    1993-10-01

    The Federal Facilities Compliance Act (the Act) of 1992 waives sovereign immunity for federal facilities for fines and penalties under the provisions of the Resource Recovery and Conservation Act, state, interstate, and local hazardous and solid waste management requirements. However, for three years the Act delays the waiver for violations involving US Department of Energy (DOE) facilities. The Act, however, requires that the DOE prepare a Conceptual Site Treatment Plan (CSTP) for each of its sites that generate or store mixed wastes (MWs). The purpose of the CSTP is to present DOE`s preliminary evaluations of the development of treatment capacitiesmore » and technologies for treating a site`s MW. This CSTP presents the preliminary capacity and technology evaluation for the Laboratory for Energy-Related Health Research (LEHR). The five identified MW streams at LEHR are evaluated to the extent possible given available information. Only one MW stream is sufficiently well defined to permit a technology evaluation to be performed. Two other MW streams are in the process of being characterized so that an evaluation can be performed. The other two MW streams will be generated by the decommissioning of inactive facilities onsite within the next five years.« less

  18. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  19. Afraid to Start Because the Outcome is Uncertain?: Social Site Characterization as a Tool for Informing Public Engagement Efforts

    USGS Publications Warehouse

    Wade, S.; Greenberg, S.

    2009-01-01

    This paper introduces the concept of social site characterization as a parallel effort to technical site characterization to be used in evaluating and planning carbon dioxides capture and storage (CCS) projects. Social site characterization, much like technical site characterization, relies on a series of iterative investigations into public attitudes towards a CCS project and the factors that will shape those views. This paper also suggests ways it can be used to design approaches for actively engaging stakeholders and communities in the deployment of CCS projects. This work is informed by observing the site selection process for FutureGen and the implementation of research projects under the Regional Carbon Sequestration Partnership Program. ?? 2009 Elsevier Ltd. All rights reserved.

  20. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Victoria Avenue to Citrus Groves) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  1. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    DTIC Science & Technology

    2012-05-22

    Planning 14 and airfields. Don’t want to clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base...clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base camp site location is chosen based on

  2. A new spatial multi-criteria decision support tool for site selection for implementation of managed aquifer recharge.

    PubMed

    Rahman, M Azizur; Rusteberg, Bernd; Gogu, R C; Lobo Ferreira, J P; Sauter, Martin

    2012-05-30

    This study reports the development of a new spatial multi-criteria decision analysis (SMCDA) software tool for selecting suitable sites for Managed Aquifer Recharge (MAR) systems. The new SMCDA software tool functions based on the combination of existing multi-criteria evaluation methods with modern decision analysis techniques. More specifically, non-compensatory screening, criteria standardization and weighting, and Analytical Hierarchy Process (AHP) have been combined with Weighted Linear Combination (WLC) and Ordered Weighted Averaging (OWA). This SMCDA tool may be implemented with a wide range of decision maker's preferences. The tool's user-friendly interface helps guide the decision maker through the sequential steps for site selection, those steps namely being constraint mapping, criteria hierarchy, criteria standardization and weighting, and criteria overlay. The tool offers some predetermined default criteria and standard methods to increase the trade-off between ease-of-use and efficiency. Integrated into ArcGIS, the tool has the advantage of using GIS tools for spatial analysis, and herein data may be processed and displayed. The tool is non-site specific, adaptive, and comprehensive, and may be applied to any type of site-selection problem. For demonstrating the robustness of the new tool, a case study was planned and executed at Algarve Region, Portugal. The efficiency of the SMCDA tool in the decision making process for selecting suitable sites for MAR was also demonstrated. Specific aspects of the tool such as built-in default criteria, explicit decision steps, and flexibility in choosing different options were key features, which benefited the study. The new SMCDA tool can be augmented by groundwater flow and transport modeling so as to achieve a more comprehensive approach to the selection process for the best locations of the MAR infiltration basins, as well as the locations of recovery wells and areas of groundwater protection. The new spatial multicriteria analysis tool has already been implemented within the GIS based Gabardine decision support system as an innovative MAR planning tool. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  4. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Groves & Irrigation System to Grove Canal) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  5. Multi-Attribute Selection of Coal Center Location: A Case Study in Thailand

    NASA Astrophysics Data System (ADS)

    Kuakunrittiwong, T.; Ratanakuakangwan, S.

    2016-11-01

    Under Power Development Plan 2015, Thailand has to diversify its heavily gas-fired electricity generation. The main owner of electricity transmission grids is responsible to implement several coal-fired power plants with clean coal technology. To environmentally handle and economically transport unprecedented quantities of sub-bituminous and bituminous coal, a coal center is required. The location of such facility is an important strategic decision and a paramount to the success of the energy plan. As site selection involves many criteria, Fuzzy Analytical Hierarchy Process or Fuzzy-AHP is applied to select the most suitable location among three candidates. Having analyzed relevant criteria and the potential alternatives, the result reveals that engineering and socioeconomic are important criteria and Map Ta Phut is the most suitable site for the coal center.

  6. Corrective Action Plan for Corrective Action Unit 453: Area 9 UXO Landfill, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada

    1998-09-30

    This corrective action plan proposes the closure method for the area 9 unexploded Ordnance landfill, corrective action unit 453 located at the Tonopah Test Range. The area 9 UXO landfill consists of corrective action site no. 09-55-001-0952 and is comprised of three individual landfill cells designated as A9-1, A9-2, and A9-3. The three landfill cells received wastes from daily operations at area 9 and from range cleanups which were performed after weapons testing. Cell locations and contents were not well documented due to the unregulated disposal practices commonly associated with early landfill operations. However, site process knowledge indicates that themore » landfill cells were used for solid waste disposal, including disposal of UXO.« less

  7. Grid site availability evaluation and monitoring at CMS

    DOE PAGES

    Lyons, Gaston; Maciulaitis, Rokas; Bagliesi, Giuseppe; ...

    2017-10-01

    The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) uses distributed grid computing to store, process, and analyse the vast quantity of scientific data recorded every year. The computing resources are grouped into sites and organized in a tiered structure. Each site provides computing and storage to the CMS computing grid. Over a hundred sites worldwide contribute with resources from hundred to well over ten thousand computing cores and storage from tens of TBytes to tens of PBytes. In such a large computing setup scheduled and unscheduled outages occur continually and are not allowed to significantly impactmore » data handling, processing, and analysis. Unscheduled capacity and performance reductions need to be detected promptly and corrected. CMS developed a sophisticated site evaluation and monitoring system for Run 1 of the LHC based on tools of the Worldwide LHC Computing Grid. For Run 2 of the LHC the site evaluation and monitoring system is being overhauled to enable faster detection/reaction to failures and a more dynamic handling of computing resources. Furthermore, enhancements to better distinguish site from central service issues and to make evaluations more transparent and informative to site support staff are planned.« less

  8. Grid site availability evaluation and monitoring at CMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lyons, Gaston; Maciulaitis, Rokas; Bagliesi, Giuseppe

    The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) uses distributed grid computing to store, process, and analyse the vast quantity of scientific data recorded every year. The computing resources are grouped into sites and organized in a tiered structure. Each site provides computing and storage to the CMS computing grid. Over a hundred sites worldwide contribute with resources from hundred to well over ten thousand computing cores and storage from tens of TBytes to tens of PBytes. In such a large computing setup scheduled and unscheduled outages occur continually and are not allowed to significantly impactmore » data handling, processing, and analysis. Unscheduled capacity and performance reductions need to be detected promptly and corrected. CMS developed a sophisticated site evaluation and monitoring system for Run 1 of the LHC based on tools of the Worldwide LHC Computing Grid. For Run 2 of the LHC the site evaluation and monitoring system is being overhauled to enable faster detection/reaction to failures and a more dynamic handling of computing resources. Furthermore, enhancements to better distinguish site from central service issues and to make evaluations more transparent and informative to site support staff are planned.« less

  9. Grid site availability evaluation and monitoring at CMS

    NASA Astrophysics Data System (ADS)

    Lyons, Gaston; Maciulaitis, Rokas; Bagliesi, Giuseppe; Lammel, Stephan; Sciabà, Andrea

    2017-10-01

    The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) uses distributed grid computing to store, process, and analyse the vast quantity of scientific data recorded every year. The computing resources are grouped into sites and organized in a tiered structure. Each site provides computing and storage to the CMS computing grid. Over a hundred sites worldwide contribute with resources from hundred to well over ten thousand computing cores and storage from tens of TBytes to tens of PBytes. In such a large computing setup scheduled and unscheduled outages occur continually and are not allowed to significantly impact data handling, processing, and analysis. Unscheduled capacity and performance reductions need to be detected promptly and corrected. CMS developed a sophisticated site evaluation and monitoring system for Run 1 of the LHC based on tools of the Worldwide LHC Computing Grid. For Run 2 of the LHC the site evaluation and monitoring system is being overhauled to enable faster detection/reaction to failures and a more dynamic handling of computing resources. Enhancements to better distinguish site from central service issues and to make evaluations more transparent and informative to site support staff are planned.

  10. Methodology for Augmenting Existing Paths with Additional Parallel Transects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, John E.

    2013-09-30

    Visual Sample Plan (VSP) is sample planning software that is used, among other purposes, to plan transect sampling paths to detect areas that were potentially used for munition training. This module was developed for application on a large site where existing roads and trails were to be used as primary sampling paths. Gap areas between these primary paths needed to found and covered with parallel transect paths. These gap areas represent areas on the site that are more than a specified distance from a primary path. These added parallel paths needed to optionally be connected together into a single path—themore » shortest path possible. The paths also needed to optionally be attached to existing primary paths, again with the shortest possible path. Finally, the process must be repeatable and predictable so that the same inputs (primary paths, specified distance, and path options) will result in the same set of new paths every time. This methodology was developed to meet those specifications.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goltz, M.N.; Carrothers, T.J.; Hopkins, G.D.

    A full-scale study of in situ bioremediation is being planned for implementation at a trichloroethylene (TCE) contaminated site at Edwards Air Force Base. To support the demonstration, laboratory studies of sorption and biodegradation were performed. Column studies conducted with TCE and Edwards aquifer material determined the sorption distribution coefficient to be 0.1 millileters per gram, corresponding to a 1.5 retardation factor. Edwards aquifer material from four different depths was used to study cometabolic TCE biodegradation in the presence of toluene under aerobic conditions. The studies showed steady state TCE removal of greater than or equal to 85% in the microcosms.more » A base line simulation was performed using a computer model which incorporated all significant flow and transport processes. The simulation shows how TCE mass declines in both the dissolved and sorbed phases over the four months planned for the demonstration. Based on these preliminary studies, it appears that the planned operation of the bioremediation system can be expected to result in observable decreases in TCE mass and concentration at the Edwards demonstration site.« less

  12. Tribal Child Care Facilities: A Guide to Construction and Renovation.

    ERIC Educational Resources Information Center

    National Child Care Information Center, Vienna, VA.

    This document provides technical assistance in addressing major areas of the child care facility construction and renovation process, including conducting a child care community needs assessment, identifying a site, financing costs, developing a business plan, conducting an environmental assessment, building and designing a facility, and hiring…

  13. Examples of Disposition Alternatives for WTP Solid Secondary Waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seitz, R.

    The Hanford Waste Treatment and Immobilization Plant is planned to produce a variety of solid secondary wastes that will require disposal at the Integrated Disposal Facility on the Hanford Site. Solid secondary wastes include a variety of waste streams that are a result of waste treatment and processing activities.

  14. Pathways to the Outdoor Classroom.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Natural Resources, St. Paul. Bureau of Information and Education.

    This bibliography is designed to assist educators in establishing an outdoor classroom for environmental education. A process is detailed by which school districts can effectively and efficiently develop a site on or near the school. The first step involves organizing a planning committee, enlisting administrative support, and developing a budget.…

  15. NSAC Recommends a Relativistic Heavy-Ion Collider.

    ERIC Educational Resources Information Center

    Physics Today, 1984

    1984-01-01

    Describes the plan submitted by the Nuclear Science Advisory Committee to the Department of Energy and National Science Foundation urging construction of an ultrarelativistic heavy-ion collider designed to accelerate nucleon beams of ions as heavy as uranium. Discusses the process of selecting the type of facility as well as siting. (JM)

  16. 14 CFR 415.117 - Ground safety.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Ground safety. 415.117 Section 415.117... From a Non-Federal Launch Site § 415.117 Ground safety. (a) General. An applicant's safety review document must include a ground safety analysis report, and a ground safety plan for its launch processing...

  17. 14 CFR 415.117 - Ground safety.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Ground safety. 415.117 Section 415.117... From a Non-Federal Launch Site § 415.117 Ground safety. (a) General. An applicant's safety review document must include a ground safety analysis report, and a ground safety plan for its launch processing...

  18. Designing sustainable and economically attractive brownfield revitalization options using an integrated assessment model.

    PubMed

    Schädler, S; Morio, M; Bartke, S; Rohr-Zänker, R; Finkel, M

    2011-03-01

    We describe the development of an integrated assessment model which evaluates redevelopment options of large contaminated brownfields and we present the application of the model in a case study. Aiming to support efficient and sustainable revitalization and communication between stakeholders, the presented assessment model integrates three pinnacles of brownfield revitalization: (i) subsurface remediation and site preparation costs, (ii) market-oriented economic appraisal, and (iii) the expected contribution of planned future land use to sustainable community and regional development. For the assessment, focus is set on the early stage of the brownfield redevelopment process, which is characterized by limited data availability and by flexibility in land use planning and development scope. At this stage, revealing the consequences of adjustments and alterations in planning options can foster efficiency in communication between the involved parties and thereby facilitates the brownfield revitalization process. Results from the case-study application indicate that the integrated assessment provides help in the identification of land use options beneficial in both a sustainable and an economical sense. For the study site it is shown on one hand that brownfield redevelopment is not automatically in line with sustainable regional development, and on the other hand it is demonstrated that additional contributions to sustainability are not intrinsically tied to increased costs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  19. EGU2013 SM1.4/GI1.6 session: "Improving seismic networks performances: from site selection to data integration"

    NASA Astrophysics Data System (ADS)

    Pesaresi, D.; Busby, R.

    2013-08-01

    The number and quality of seismic stations and networks in Europe continually improves, nevertheless there is always scope to optimize their performance. In this session we welcomed contributions from all aspects of seismic network installation, operation and management. This includes site selection; equipment testing and installation; planning and implementing communication paths; policies for redundancy in data acquisition, processing and archiving; and integration of different datasets including GPS and OBS.

  20. Proceedings from the U.S. Army Corps of Engineers (USACE) and the National Oceanic and Atmospheric Administration (NOAA) Engineering With Nature Workshop

    DTIC Science & Technology

    2017-03-01

    opportunities emerged. It will be essential to capture and share lessons learned as the two organizations plan and implement selected EWN projects...their top five or six opportunities and subsequently selected the two highest priorities. Each of the three breakout groups then worked together to...will ensure agency buy-in, establish local reference sites, and promote EWN principles. Site selection will include an iterative process that factors

  1. Biogeochemical behaviour and bioremediation of uranium in waters of abandoned mines.

    PubMed

    Mkandawire, Martin

    2013-11-01

    The discharges of uranium and associated radionuclides as well as heavy metals and metalloids from waste and tailing dumps in abandoned uranium mining and processing sites pose contamination risks to surface and groundwater. Although many more are being planned for nuclear energy purposes, most of the abandoned uranium mines are a legacy of uranium production that fuelled arms race during the cold war of the last century. Since the end of cold war, there have been efforts to rehabilitate the mining sites, initially, using classical remediation techniques based on high chemical and civil engineering. Recently, bioremediation technology has been sought as alternatives to the classical approach due to reasons, which include: (a) high demand of sites requiring remediation; (b) the economic implication of running and maintaining the facilities due to high energy and work force demand; and (c) the pattern and characteristics of contaminant discharges in most of the former uranium mining and processing sites prevents the use of classical methods. This review discusses risks of uranium contamination from abandoned uranium mines from the biogeochemical point of view and the potential and limitation of uranium bioremediation technique as alternative to classical approach in abandoned uranium mining and processing sites.

  2. Predictive assimilation framework to support contaminated site understanding and remediation

    NASA Astrophysics Data System (ADS)

    Versteeg, R. J.; Bianchi, M.; Hubbard, S. S.

    2014-12-01

    Subsurface system behavior at contaminated sites is driven and controlled by the interplay of physical, chemical, and biological processes occurring at multiple temporal and spatial scales. Effective remediation and monitoring planning requires an understanding of this complexity that is current, predictive (with some level of confidence) and actionable. We present and demonstrate a predictive assimilation framework (PAF). This framework automatically ingests, quality controls and stores near real-time environmental data and processes these data using different inversion and modeling codes to provide information on the current state and evolution of the subsurface system. PAF is implemented as a cloud based software application which has five components: (1) data acquisition, (2) data management, (3) data assimilation and processing, (4) visualization and result deliver and (5) orchestration. Access to and interaction with PAF is done through a standard browser. PAF is designed to be modular so that it can ingest and process different data streams dependent on the site. We will present an implementation of PAF which uses data from a highly instrumented site (the DOE Rifle Subsurface Biogeochemistry Field Observatory in Rifle, Colorado) for which PAF automatically ingests hydrological data and forward models groundwater flow in the saturated zone.

  3. Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and Land Use Map. USACOE, 31 December 1954 - Fort Custer Military Reservation, Bounded by Territorial, Dickman, & Longman Roads & Route 94 Business, Battle Creek, Calhoun County, MI

  4. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailing site Maybell, Colorado. Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-06-01

    The U.S. Environmental Protection Agency (EPA) has established health and environmental regulations to correct and prevent ground water contamination resulting from former uranium processing activities at inactive uranium processing sites (40 CFR Part 192 (1993)) (52 FR 36000 (1978)). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC {section} 7901 et seq.), the U.S. Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has decided that each assessment will include information on hydrogeologic site characterization. The water resources protection strategy that describes the proposed action compliance with the EPAmore » ground water protection standards is presented in Attachment 4, Water Resources Protection Strategy. Site characterization activities discussed in this section include the following: (1) Definition of the hydrogeologic characteristics of the environment, including hydrostratigraphy, aquifer parameters, areas of aquifer recharge and discharge, potentiometric surfaces, and ground water velocities. (2) Definition of background ground water quality and comparison with proposed EPA ground water protection standards. (3) Evaluation of the physical and chemical characteristics of the contaminant source and/or residual radioactive materials. (4) Definition of existing ground water contamination by comparison with the EPA ground water protection standards. (5) Description of the geochemical processes that affect the migration of the source contaminants at the processing site. (6) Description of water resource use, including availability, current and future use and value, and alternate water supplies.« less

  5. A framework for planning of sustainable water and sanitation systems in peri-urban areas.

    PubMed

    Törnqvist, R; Norström, A; Kärrman, E; Malmqvist, P-A

    2008-01-01

    There are billions of people around the world that lack access to safe water supply and basic sanitation, a situation which puts the affected in severe health conditions as well as economical and social despair. Many of those lacking adequate water supply and sanitation systems can be found at the fringe of the cities in so called peri-urban areas, especially in the developing world. Planning in these areas is highly complex due to challenging environmental and physical conditions, high population density and unclear institutional boundaries. This article presents a framework aiming to support the planning process for sustainable water and sanitation systems in peri-urban areas. The suggested framework is based on different available planning approaches from a review of literature and websites of organisations and companies. It consists of a recommendation of important steps in the planning process as well as supporting tools. Further, it incorporates a set of sustainability criteria important for the peri-urban context and allows for the development of site specific systems. The framework has the aim to be flexible for different planning situations, and for suiting planners with different perspectives and amount of resources. (c) IWA Publishing 2008.

  6. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  7. 34. Site Plan: Fort Custer Air Force Station, Fort Custer, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Site Plan: Fort Custer Air Force Station, Fort Custer, Michigan, Modification of Electrical Distribution, General Site Plan, USACOE, no date. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  8. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding to...

  9. Social equity and environmental risk

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, R.

    1993-12-01

    Social equity has become an important concern of the environmental movement over the past decade. The equity issue is analyzed here for practically all of the inactive hazardous waste disposal sites on the National Priorities List (NPL) regulated under the Comprehensive Response Compensation and Liability Act and its 1986 Superfund Amendments and Reauthorization Act (CERCLA/SARA). Two dimensions of equity are emphasized, namely, site location relative to the location of minority population and the distribution of cleanup plans or Records of Decision (ROD) across communities with NPL sites that have different socioeconomic characteristics. With respect to site location, the percentage ofmore » Blacks and Hispanics aggregated at the Census Place or MCD level in communities with NPL sites was greater than is typical nationwide (largely attributable to the concentration of minority populations in a few large urban areas with NPL sites). The percentage of the population below the poverty line in communities with NPL sites largely matched that of the nation as a whole. With respect to site cleanup, communities with relatively higher percentages of racial minority population have fewer cleanup plans than other communities with NPL site. Whether a ROD exists is influenced by when the site was designated for the NPL: sites designated earlier are more likely to have RODs and less likely to have high proportions of racial minority populations than sites designated later. This implies that initially the designation process may have resulted in NPL sites being located disproportionately in minority areas, but this pattern seems to be reversing itself in more recently designated sites. Racial and ethnic disproportionalities with respect to inactive hazardous waste site location seem to be concentrated in a relatively few areas. 35 refs., 12 tabs.« less

  10. Boulder Distributions at Legacy Landing Sites: Assessing Regolith Production Rates and Landing Site Hazards

    NASA Technical Reports Server (NTRS)

    Watkins, R. N.; Jolliff, B. L.; Lawrence, S. J.; Hayne, P. O.; Ghent, R. R.

    2017-01-01

    Understanding how the distribution of boulders on the lunar surface changes over time is key to understanding small-scale erosion processes and the rate at which rocks become regolith. Boulders degrade over time, primarily as a result of micrometeorite bombardment so their residence time at the surface can inform the rate at which rocks become regolith or become buried within regolith. Because of the gradual degradation of exposed boulders, we expect that the boulder population around an impact crater will decrease as crater age increases. Boulder distributions around craters of varying ages are needed to understand regolith production rates, and Lunar Reconnaissance Orbiter Camera (LROC) Narrow Angle Camera (NAC) images provide one of the best tools for conducting these studies. Using NAC images to assess how the distribution of boulders varies as a function of crater age provides key constraints for boulder erosion processes. Boulders also represent a potential hazard that must be addressed in the planning of future lunar landings. A boulder under a landing leg can contribute to deck tilt, and boulders can damage spacecraft during landing. Using orbital data to characterize boulder populations at locations where landers have safely touched down (Apollo, Luna, Surveyor, Chang'e-3) provides validation for landed mission hazard avoidance planning. Additionally, counting boulders at legacy landing sites is useful because: 1) LROC has extensive coverage of these sites at high resolutions (approximately 0.5 meters per pixel). 2) Returned samples from craters at these sites have been radiometrically dated, allowing assessment of how boulder distributions vary as a function of crater age. 3) Surface photos at these sites can be used to correlate with remote sensing measurements.

  11. An improved FIB sample preparation technique for site-specific plan-view specimens: A new cutting geometry.

    PubMed

    Li, Chen; Habler, Gerlinde; Baldwin, Lisa C; Abart, Rainer

    2018-01-01

    Focused ion beam (FIB) sample preparation technique in plan-view geometry allows direct correlations of the atomic structure study via transmission electron microscopy with micrometer-scale property measurements. However, one main technical difficulty is that a large amount of material must be removed underneath the specimen. Furthermore, directly monitoring the milling process is difficult unless very large material volumes surrounding the TEM specimen site are removed. In this paper, a new cutting geometry is introduced for FIB lift-out sample preparation with plan-view geometry. Firstly, an "isolated" cuboid shaped specimen is cut out, leaving a "bridge" connecting it with the bulk material. Subsequently the two long sides of the "isolated" cuboid are wedged, forming a triangular prism shape. A micromanipulator needle is used for in-situ transfer of the specimen to a FIB TEM grid, which has been mounted parallel with the specimen surface using a simple custom-made sample slit. Finally, the grid is transferred to the standard FIB grid holder for final thinning with standard procedures. This new cutting geometry provides clear viewing angles for monitoring the milling process, which solves the difficulty of judging whether the specimen has been entirely detached from the bulk material, with the least possible damage to the surrounding materials. With an improved success rate and efficiency, this plan-view FIB lift-out specimen preparation technique should have a wide application for material science. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists,more » a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.« less

  13. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  14. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  15. Toward a Conceptual Framework for Blending Social and Biophysical Attributes in Conservation Planning: A Case-Study of Privately-Conserved Lands

    NASA Astrophysics Data System (ADS)

    Pasquini, Lorena; Twyman, Chasca; Wainwright, John

    2010-11-01

    There has been increasing recognition within systematic conservation planning of the need to include social data alongside biophysical assessments. However, in the approaches to identify potential conservation sites, there remains much room for improvement in the treatment of social data. In particular, few rigorous methods to account for the diversity of less-easily quantifiable social attributes that influence the implementation success of conservation sites (such as willingness to conserve) have been developed. We use a case-study analysis of private conservation areas within the Little Karoo, South Africa, as a practical example of the importance of incorporating social data into the process of selecting potential conservation sites to improve their implementation likelihood. We draw on extensive data on the social attributes of our case study obtained from a combination of survey questionnaires and semi-structured interviews. We discuss the need to determine the social attributes that are important for achieving the chosen implementation strategy by offering four tested examples of important social attributes in the Little Karoo: the willingness of landowners to take part in a stewardship arrangement, their willingness to conserve, their capacity to conserve, and the social capital among private conservation area owners. We then discuss the process of using an implementation likelihood ratio (derived from a combined measure of the social attributes) to assist the choice of potential conservation sites. We conclude by summarizing our discussion into a simple conceptual framework for identifying biophysically-valuable sites which possess a high likelihood that the desired implementation strategy will be realized on them.

  16. Site scientific mission plan for the Southern Great Plains CART site, January-June 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.

    1994-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less

  17. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  18. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  19. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  20. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  1. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  2. Master Plans for Park Sites.

    ERIC Educational Resources Information Center

    Van Meter, Jerry R.

    This booklet is a general guide to park site planning. The four basic steps involved in developing a park site are a) determination of the uses of the site, b) analysis of the site potential for these uses, c) identification of the functional relationship among the uses, and d) coordination of the uses to the park sites. Uses of park sites are…

  3. Value-focused framework for defining landscape-scale conservation targets

    USGS Publications Warehouse

    Romañach, Stephanie; Benscoter, Allison M.; Brandt, Laura A.

    2016-01-01

    Conservation of natural resources can be challenging in a rapidly changing world and require collaborative efforts for success. Conservation planning is the process of deciding how to protect, conserve, and enhance or minimize loss of natural and cultural resources. Establishing conservation targets (also called indicators or endpoints), the measurable expressions of desired resource conditions, can help with site-specific up to landscape-scale conservation planning. Using conservation targets and tracking them through time can deliver benefits such as insight into ecosystem health and providing early warnings about undesirable trends. We describe an approach using value-focused thinking to develop statewide conservation targets for Florida. Using such an approach allowed us to first identify stakeholder objectives and then define conservation targets to meet those objectives. Stakeholders were able to see how their shared efforts fit into the broader conservation context, and also anticipate the benefits of multi-agency and -organization collaboration. We developed an iterative process for large-scale conservation planning that included defining a shared framework for the process, defining the conservation targets themselves, as well as developing management and monitoring strategies for evaluation of their effectiveness. The process we describe is applicable to other geographies where multiple parties are seeking to implement collaborative, large-scale biological planning.

  4. Assessing emergency planning zone for new nuclear power plant considering risk of extreme external events

    NASA Astrophysics Data System (ADS)

    Alzbutas, Robertas

    2015-04-01

    In general, the Emergency Planning Zones (EPZ) are defined as well as plant site and arrangement structures are designed to minimize the potential for natural and manmade hazards external to the plant from affecting the plant safety related functions, which can affect nearby population and environment. This may include consideration of extreme winds, fires, flooding, aircraft crash, seismic activity, etc. Thus the design basis for plant and site is deeply related to the effects of any postulated external events and the limitation of the plant capability to cope with accidents i.e. perform safety functions. It has been observed that the Probabilistic Safety Assessment (PSA) methodologies to deal with EPZ and extreme external events have not reached the same level of maturity as for severe internal events. The design basis for any plant and site is deeply related to the effects of any postulated external events and the limitation of the plant capability to cope with accidents i.e. perform safety functions. As a prime example of an advanced reactor and new Nuclear Power Plant (NPP) with enhanced safety, the International Reactor Innovative and Secure (IRIS) and Site selection for New NPP in Lithuania had been considered in this work. In the used Safety-by-Design™ approach, the PSA played obviously a key role; therefore a Preliminary IRIS PSA had been developed along with the design. For the design and pre-licensing process of IRIS the external events analysis included both qualitative evaluation and quantitative assessment. As a result of preliminary qualitative analyses, the external events that were chosen for more detailed quantitative scoping evaluation were high winds and tornadoes, aircraft crash, and seismic events. For the site selection in Lithuania a detail site evaluation process was performed and related to the EPZ and risk zoning considerations. In general, applying the quantitative assessment, bounding site characteristics could be used in order to optimize potential redefinition or future restrictions on plant siting and risk zoning. It must be noticed that the use of existing regulations and installations as the basis for this redefinition will not in any way impact the high degree of conservatism inherent in current regulations. Moreover, the remapping process makes this methodology partially independent from the uncertainties still affecting probabilistic techniques. Notwithstanding these considerations, it is still expected that applying this methodology to advanced plant designs with improved safety features will allow significant changes in the emergency planning requirements, and specifically the size of the EPZ. In particular, in the case of IRIS it is expected that taking full credit of the Safety-by-Design™ approach of the IRIS reactor will allow a dramatic changes in the EPZ, while still maintaining a level of protection to the public fully consistent with existing regulations.

  5. A planned care approach and patient registry to improve adherence to clinical guidelines for the diagnosis and management of attention-deficit/hyperactivity disorder.

    PubMed

    Geltman, Paul L; Fried, Lise E; Arsenault, Lisa N; Knowles, Alice M; Link, David A; Goldstein, Joel N; Perrin, James M; Hacker, Karen A

    2015-01-01

    Attention-deficit/hyperactivity disorder (ADHD) affects almost 2.4 million US children. Because American Academy of Pediatrics guidelines for ADHD recommend use of standardized diagnostic instruments, regular follow-up and the chronic care model, this pilot project sought to implement and assess an electronic registry of patients with ADHD combined with care coordination by a planned care team. This quality improvement project was structured with 2 intervention and 2 control clinics to facilitate evaluation of the use of a planned care system for management of ADHD. Care teams included a pediatrician, nurse, medical assistant, and care coordinator and tracked patients using an electronic registry with data drawn from the EMR. Clinical work flows were pilot tested to facilitate use of the Vanderbilt scales and their incorporation into the EMR at intervention sites. Outcome measures included 2 recommended clinical follow-ups based on HEDIS measures as well as use of the Vanderbilt rating scales. Initiation phase measure was for follow-up after initiating medication, while the continuation phase measure was for subsequent follow-up during the first year of treatment. Measures were monitored during the project year and then also in the ensuing period of spread of the intervention to other sites. Although the modified HEDIS initiation phase measure for patients newly on medication remained static at approximately 50% throughout the project period, the continuation phase measure showed improvement from 35% at baseline to 45% at the end of the project assessment year, a 29% increase. Follow-up for patients stable on medications also remained unchanged during the project period, but during subsequent spreading of the intervention to nonproject sites, follow-up of these patients improved to over 90%. In adjusted analyses, patients with ADHD at intervention sites were over 2 times more likely than patients at control sites to have had a Vanderbilt score documented in their records. The project achieved modest improvements in the diagnostic and treatment process for patients with ADHD. The use of a planned care system and electronic patient registry shows promise for improving the diagnosis and treatment process for patients with ADHD. Copyright © 2015 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  6. Natura 2000 appropriate assessment: Shortcomings and improvements in Finnish practice

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soederman, Tara

    2009-02-15

    The EU Habitats Directive 92/43/EEC requires impact assessments called Appropriate Assessments (AA) for plans and projects probably having adverse effects on the sites of European ecological importance, Natura 2000 sites. Seventy-three Appropriate Assessment reports and seventy official opinions given on them by regional environmental authorities from 1997 to 2005 were reviewed. The findings of the study demonstrate typical shortcomings of ecological impact assessment: a weak information basis for assessment outcomes and lack of proper cumulative impact assessment with respect to ecological structures and processes. The quality of reporting has improved over time with respect to direct impacts on individual habitatmore » types and species and detailed mitigation measures. Regional environment centres considered one fifth of the AA reports to be inadequate because of lacking data. In most cases the regional environment centres demanded a change of plan or project, added mitigation measures, choice of only one alternative for further planning or a new completed assessment with additional information in order to be able to evaluate the significance of the effects. The study underlines the need for iterative planning practices in which the preparation of a plan or project with alternative options goes hand in hand with the impact assessment equipped with sufficient data.« less

  7. A Roadmap for the Implementation of Continued Process Verification.

    PubMed

    Boyer, Marcus; Gampfer, Joerg; Zamamiri, Abdel; Payne, Robin

    2016-01-01

    In 2014, the members of the BioPhorum Operations Group (BPOG) produced a 100-page continued process verification case study, entitled "Continued Process Verification: An Industry Position Paper with Example Protocol". This case study captures the thought processes involved in creating a continued process verification plan for a new product in response to the U.S. Food and Drug Administration's guidance on the subject introduced in 2011. In so doing, it provided the specific example of a plan developed for a new molecular antibody product based on the "A MAb Case Study" that preceded it in 2009.This document provides a roadmap that draws on the content of the continued process verification case study to provide a step-by-step guide in a more accessible form, with reference to a process map of the product life cycle. It could be used as a basis for continued process verification implementation in a number of different scenarios: For a single product and process;For a single site;To assist in the sharing of data monitoring responsibilities among sites;To assist in establishing data monitoring agreements between a customer company and a contract manufacturing organization. The U.S. Food and Drug Administration issued guidance on the management of manufacturing processes designed to improve quality and control of drug products. This involved increased focus on regular monitoring of manufacturing processes, reporting of the results, and the taking of opportunities to improve. The guidance and practice associated with it is known as continued process verification This paper summarizes good practice in responding to continued process verification guidance, gathered from subject matter experts in the biopharmaceutical industry. © PDA, Inc. 2016.

  8. Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2008-03-26

    This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review ofmore » an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.« less

  9. Strategies for ensuring quality data from Indian investigational sites

    PubMed Central

    Hajos, Antal K.; Kamble, Sujal K.

    2011-01-01

    The topic of ensuring quality and compliance is and must be a top priority in the conduct of clinical trials, as warranted by regulatory guidelines as well as the inherent responsibility of the professionals conducting such research. Fast-growing emerging clinical geographies such as India demand special attention due to rapid growth and associated factors that may put study quality at risk. In this paper, we used the basic principle of PDCA (Plan, Do, Check, and Adjust) to structure the processes of a clinical trial from protocol to final analysis in order to highlight the interactive nature of involved people and processes required to ensure quality of data and site functioning. PMID:21731855

  10. America Plans for Space

    DTIC Science & Technology

    1986-01-01

    facility. Another use of lunar soil on the lunar surface would be in site preparation. Inorganic polymers based on silicon could be added to stabilize...for space construction.1 3 LIVING OFF THE LAND 63 Another lunar material that may be useful with a minimum of processing is basalt . Processed basalt is...already manufac- tured in Europe and the United States. Cast basalt can be used to fabricate pipes, tiles, plates, and fittings. Sintered basalt can

  11. Evaluation of Channel Infill Processes in Relation to Forcing Data

    DTIC Science & Technology

    2016-05-01

    processes that influence channel shoaling, and the site- specific conditions, are also valuable when attempting to predict what type of sediment will...need to be removed in the next dredge cycle as well as where in the channel the sediment is likely to accumulate. This knowledge is helpful in planning...directly related to sediment load and is often the source of cohesive sediments that are transported downstream to navigation channels , harbors, and

  12. 39. Photo copy of site plan, (original in Forest Service ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photo copy of site plan, (original in Forest Service Office, Elkins, WV, 'Parsons Nursery Special Use Permit, West Virginia Department of Natural Resources'), 1969. PARSONS NURSERY SITE PLAN. CORROLATES TO PARSONS NURSERY AT TIME OF FLOOD, NOVEMBER, 1985. - Parsons Nursery, South side of U.S. Route 219, Parsons, Tucker County, WV

  13. Implementation of Policy, Systems, and Environmental Community-Based Interventions for Cardiovascular Health Through a National Not-for-Profit: A Multiple Case Study.

    PubMed

    Garney, Whitney R; Szucs, Leigh E; Primm, Kristin; King Hahn, Laura; Garcia, Kristen M; Martin, Emily; McLeroy, Kenneth

    2018-05-01

    In 2014, the Centers for Disease Control and Prevention funded the American Heart Association to implement policy, systems, and environment-focused strategies targeting access to healthy food and beverages, physical activity, and smoke-free environments. To understand factors affecting implementation and variations in success across sites, evaluators conducted a multiple case study. Based on past literature, community sites were categorized as capacity-building or implementation-ready, for comparison. A sample of six communities were selected using a systematic selection tool. Through site visits, evaluators conducted interviews with program staff and community partners and assessed action plans. Evaluators identified important implications for nationally coordinated community-based prevention programming. Differences in implementation varied by the communities' readiness, with the most notable differences in how they planned activities and defined success. Existing partner relationships (or lack thereof) played a significant role, regardless of the American Heart Association's existing presence within the communities, in the progression of initiatives and the differences observed among phases. Last, goals in capacity-building sites were tied to organizational goals while goals in implementation-ready sites were more incremental with increased community influence and buy-in. Using national organizations as a mechanism to carry out large-scale community-based prevention work is a viable option that provides coordinated, wide-scale implementation without sacrificing a community's priorities or input. In funding future initiatives, the presence of relationships and the time needed to cultivate such relationships should be accounted for in the planning and implementation processes, as well as both local and national expectations.

  14. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-08-10

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant areamore » and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.« less

  15. Regulatory requirements for nuclear power plant site selection in Malaysia-a review.

    PubMed

    Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K

    2016-12-01

    Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.

  16. Technical Review of Retrieval and Closure Plans for the INEEL INTEC Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bamberger, Judith A; Burks, Barry L; Quigley, Keith D

    2001-09-28

    The purpose of this report is to document the conclusions of a technical review of retrieval and closure plans for the Idaho National Energy and Environmental Laboratory (INEEL) Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility. In addition to reviewing retrieval and closure plans for these tanks, the review process served as an information exchange mechanism so that staff in the INEEL High Level Waste (HLW) Program could become more familiar with retrieval and closure approaches that have been completed or are planned for underground storage tanks at the Oak Ridge National Laboratory (ORNL) and Hanford sites. Thismore » review focused not only on evaluation of the technical feasibility and appropriateness of the approach selected by INEEL but also on technology gaps that could be addressed through utilization of technologies or performance data available at other DOE sites and in the private sector. The reviewers, Judith Bamberger of Pacific Northwest National Laboratory (PNNL) and Dr. Barry Burks of The Providence Group Applied Technology, have extensive experience in the development and application of tank waste retrieval technologies for nuclear waste remediation.« less

  17. Steps to a HealthierUS Cooperative Agreement Program: foundational elements for program evaluation planning, implementation, and use of findings.

    PubMed

    MacDonald, Goldie; Garcia, Danyael; Zaza, Stephanie; Schooley, Michael; Compton, Don; Bryant, Terry; Bagnol, Lulu; Edgerly, Cathy; Haverkate, Rick

    2006-01-01

    The Steps to a HealthierUS Cooperative Agreement Program (Steps Program) enables funded communities to implement chronic disease prevention and health promotion efforts to reduce the burden of diabetes, obesity, asthma, and related risk factors. At both the national and community levels, investment in surveillance and program evaluation is substantial. Public health practitioners engaged in program evaluation planning often identify desired outcomes, related indicators, and data collection methods but may pay only limited attention to an overarching vision for program evaluation among participating sites. We developed a set of foundational elements to provide a vision of program evaluation that informs the technical decisions made throughout the evaluation process. Given the diversity of activities across the Steps Program and the need for coordination between national- and community-level evaluation efforts, our recommendations to guide program evaluation practice are explicit yet leave room for site-specific context and needs. Staff across the Steps Program must consider these foundational elements to prepare a formal plan for program evaluation. Attention to each element moves the Steps Program closer to well-designed and complementary plans for program evaluation at the national, state, and community levels.

  18. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less

  19. Acceptance testing for PACS: from methodology to design to implementation

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Huang, H. K.

    2004-04-01

    Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.

  20. Health diplomacy the adaptation of global health interventions to local needs in sub-Saharan Africa and Thailand: Evaluating findings from Project Accept (HPTN 043)

    PubMed Central

    2012-01-01

    Background Study-based global health interventions, especially those that are conducted on an international or multi-site basis, frequently require site-specific adaptations in order to (1) respond to socio-cultural differences in risk determinants, (2) to make interventions more relevant to target population needs, and (3) in recognition of ‘global health diplomacy' issues. We report on the adaptations development, approval and implementation process from the Project Accept voluntary counseling and testing, community mobilization and post-test support services intervention. Methods We reviewed all relevant documentation collected during the study intervention period (e.g. monthly progress reports; bi-annual steering committee presentations) and conducted a series of semi-structured interviews with project directors and between 12 and 23 field staff at each study site in South Africa, Zimbabwe, Thailand and Tanzania during 2009. Respondents were asked to describe (1) the adaptations development and approval process and (2) the most successful site-specific adaptations from the perspective of facilitating intervention implementation. Results Across sites, proposed adaptations were identified by field staff and submitted to project directors for review on a formally planned basis. The cross-site intervention sub-committee then ensured fidelity to the study protocol before approval. Successfully-implemented adaptations included: intervention delivery adaptations (e.g. development of tailored counseling messages for immigrant labour groups in South Africa) political, environmental and infrastructural adaptations (e.g. use of local community centers as VCT venues in Zimbabwe); religious adaptations (e.g. dividing clients by gender in Muslim areas of Tanzania); economic adaptations (e.g. co-provision of income generating skills classes in Zimbabwe); epidemiological adaptations (e.g. provision of ‘youth-friendly’ services in South Africa, Zimbabwe and Tanzania), and social adaptations (e.g. modification of terminology to local dialects in Thailand: and adjustment of service delivery schedules to suit seasonal and daily work schedules across sites). Conclusions Adaptation selection, development and approval during multi-site global health research studies should be a planned process that maintains fidelity to the study protocol. The successful implementation of appropriate site-specific adaptations may have important implications for intervention implementation, from both a service uptake and a global health diplomacy perspective. PMID:22716131

  1. Progress Report on Landing Site Evaluation for the Next Japanese Lunar Exploration Project: SELENE-2

    NASA Astrophysics Data System (ADS)

    Saiki, K.; Arai, T.; Araki, H.; Ishihara, Y.; Ohtake, M.; Karouji, Y.; Kobayashi, N.; Sugihara, T.; Haruyama, J.; Honda, C.

    2010-12-01

    SELENE-2 is the next Japanese lunar exploration project that is planned to be launched by the end of fiscal year 2015. In order to select the landing site candidates which maximize the scientific return from the project, "SELENE-2 Landing Site Research Board" was organized in March, 2010. The board called for scientific proposals with landing site candidates from domestic researchers who are interested in lunar science and members of the Japanese Society for Planetary Sciences, Japan Association of Mineralogical Sciences, the Geochemical Society of Japan, Seismological society of Japan, or the Geodetic society of Japan. At present, we have 35 scientific proposals with over 70 landing site candidates submitted from 21 groups. The proposals were categorized into nine research subjects as follows: 1) Identification of mantle materials, 2) Temporal variation of igneous activity and thermal history of the moon, 3) Lava morphology, 4) Origin of swirl, 5) Crater formation mechanism, 6) Core size, 7) Internal structure (crust - mantle), 8) Origin of the region enriched in heat source elements, and 9) Origin of highland crust. We are evaluating the proposals with the landing sites, and discussing the scientific target of SELENE-2. Within 6 months, we will propose several model missions which execute the scientific exploration with the highest priority today. In our presentation, the present landing site candidates, the policy of the selection, and a plan of a further landing site selection process would be shown.

  2. Review Plan Using the NWD Model Review Plan for Continuing Authorities Program Section 14, 107, 111, 204, 206, 208, 1135 and Projects Directed by Guidance to Use CAP Procedures: Sheridan, Wyoming, Section 1135 Project

    DTIC Science & Technology

    2014-12-19

    as the creek turns and flows to the north. A brownfield site on the left bank of the river and the railroad infrastructure in this area are...processes and real estate standard easements. Hazardous, Toxic and Radioactive Waste (HTRW) Suggested: TBD There are known brownfields in the...project vicinity, therefore this reviewer should have experience in dealing with brownfields . This expertise may be covered by another discipline

  3. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one ormore » more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.« less

  4. 30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Resources Conservation Service's Web site athttp://www.info.usda.gov/scripts/lpsiis.dll/TR/TR_210_60.htm... State program approval process engineering design standards that ensure stability comparable to a 1.3 minimum static safety factor in lieu of engineering tests to establish compliance with the minimum static...

  5. 30 CFR 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Resources Conservation Service's Web site at http://www.info.usda.gov/scripts/lpsiis.dll/TR/TR_210_60.htm... authority may establish through the State program approval process, engineering design standards that ensure stability comparable to a 1.3 minimum static safety factor in lieu of engineering tests to establish...

  6. APPLICATION OF SUSTAINABILITY CRITERIA TO STELLA, MISSOURI-GENERAL BACKGROUND ON STELLA, MISSOURI-16NOV2006 (0845-0915)

    EPA Science Inventory

    The history of Stella, Missouri and the contaminated/deteriorated Cardwell Hospital is provided as background to planning and revitalization of the site and how it has driven the town to reconsider its future. The use of maps, photos, and a process of eliciting community values p...

  7. Tool time: melding watershed and site goals on private lands

    Treesearch

    Gary Bentrup; Michele Schoeneberger; Mike Dosskey; Gary Wells; Todd Kellerman

    2005-01-01

    Creating effective agroforestry systems with broad public support requires simultaneously addressing landowner and societal goals while paying respect to ecological processes that cross spatial and political boundaries. To meet this challenge, a variety of planning and design tools are needed that are straight-forward and flexible enough to accommodate the range of...

  8. Desirable functional processes: A conceptual approach for evaluating ecological condition

    Treesearch

    Alvin L. Medina; Malchus B. Baker; Daniel G. Neary

    1996-01-01

    Determining what "desired future condition" actually means has been viewed as a moving target approach for developing ecosystem management plans. The difficulty arises from trying to define what the desired condition are for any given site. In addition, definitions may be plagued with inconsistencies, contention and argument, indeterminate time frames and...

  9. The 3Ps of oak regeneration: planning, patience and persistence

    Treesearch

    Dale R. Weigel; Daniel C. Dey; John. Kabrick

    2012-01-01

    Oak regeneration research in the United States has been ongoing in earnest since the late 1950s. Most research has focused on specific silvicultural practices, regeneration processes, site characteristics, and local limiting factors such as deer browsing or interfering species. Research has evaluated the effects of thinning on regeneration development, methods for oak...

  10. The 3 Ps of oak regeneration: planning, persistence, and patience

    Treesearch

    Dale R. Weigel; Daniel C. Dey; John Kabrick

    2012-01-01

    Oak regeneration research in the United States has been ongoing in earnest since the late 1950s. Most research has focused on specific silvicultural practices, regeneration processes, site characteristics, and local limiting factors such as deer browsing or interfering species. Research has evaluated the effects of thinning on regeneration development, methods for oak...

  11. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Booth, S.; Barnett, J.; Burman, K.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zeromore » energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.« less

  12. How to develop a tele-ICU model?

    PubMed

    Rogove, Herb

    2012-01-01

    The concept of the tele-ICU (intensive care unit) is about 30 years old and more hospitals are utilizing it to cover multiple hospitals in their system or for hospitals that lack on-site critical care coverage such as in the rural setting. Doing a needs analysis, picking the appropriate committee to oversee development of the correct model, choosing quality metrics to measure, and designing an implementation plan that has a timeline is how the process should begin. Research including visitation to established programs and connecting with professional societies are helpful. Developing both a business and financial plan will optimize the value of a tele-ICU program. The innovative ICU nursing director will help to integrate a telemedicine program seamlessly with the on-site program to insure a successful program that benefits patients, their families, the ICU staff, and the hospital.

  13. Systematic Conservation Planning in the Face of Climate Change: Bet-Hedging on the Columbia Plateau

    PubMed Central

    Schloss, Carrie A.; Lawler, Joshua J.; Larson, Eric R.; Papendick, Hilary L.; Case, Michael J.; Evans, Daniel M.; DeLap, Jack H.; Langdon, Jesse G. R.; Hall, Sonia A.; McRae, Brad H.

    2011-01-01

    Systematic conservation planning efforts typically focus on protecting current patterns of biodiversity. Climate change is poised to shift species distributions, reshuffle communities, and alter ecosystem functioning. In such a dynamic environment, lands selected to protect today's biodiversity may fail to do so in the future. One proposed approach to designing reserve networks that are robust to climate change involves protecting the diversity of abiotic conditions that in part determine species distributions and ecological processes. A set of abiotically diverse areas will likely support a diversity of ecological systems both today and into the future, although those two sets of systems might be dramatically different. Here, we demonstrate a conservation planning approach based on representing unique combinations of abiotic factors. We prioritize sites that represent the diversity of soils, topographies, and current climates of the Columbia Plateau. We then compare these sites to sites prioritized to protect current biodiversity. This comparison highlights places that are important for protecting both today's biodiversity and the diversity of abiotic factors that will likely determine biodiversity patterns in the future. It also highlights places where a reserve network designed solely to protect today's biodiversity would fail to capture the diversity of abiotic conditions and where such a network could be augmented to be more robust to climate-change impacts. PMID:22174897

  14. MAPP in action in San Antonio, Texas.

    PubMed

    Shields, Kathleen M; Pruski, Charles E

    2005-01-01

    San Antonio was selected as an official Mobilizing for Action through Planning and Partnerships (MAPP) demonstration site by National Association of County and City Officials in 2000. The San Antonio Metropolitan Health District, under the leadership of Dr Fernando A. Guerra, agreed to facilitate the process. The MAPP process provided the San Antonio Metropolitan Health District, the local public health authority, a defined process for community health improvement, as well as a mechanism to help bridge the gap between public health and the community. The San Antonio Metropolitan Health District organized a Core Planning Team to lead the MAPP process in April 2001. By October 2002, the Core Planning Team was expanded to a full community working group named the Alliance for Community Health in San Antonio and Bexar County (Alliance). The Alliance identified six strategic issues, which eventually became the basis of the San Antonio Community Health Improvement Plan. The strategic issues are Public Policy, Data Tracking, Healthy Lifestyles, Promoting a Sense of Community, Access to Care, and Safe Environment. San Antonio's MAPP experience has been successful in bringing together the public health system partners, and establishing public health priorities collectively. The MAPP process has resulted in the development of many new initiatives, and, most important, has opened the door to many partnership opportunities in the future. The work of the Alliance, through the MAPP process, has helped to leverage resources for public health improvement in San Antonio, and has the potential to effect positive change in public health in the future.

  15. Features and selection of vascular access devices.

    PubMed

    Sansivero, Gail Egan

    2010-05-01

    To review venous anatomy and physiology, discuss assessment parameters before vascular access device (VAD) placement, and review VAD options. Journal articles, personal experience. A number of VAD options are available in clinical practice. Access planning should include comprehensive assessment, with attention to patient participation in the planning and selection process. Careful consideration should be given to long-term access needs and preservation of access sites. Oncology nurses are uniquely suited to perform a key role in VAD planning and placement. With knowledge of infusion therapy, anatomy and physiology, device options, and community resources, nurses can be key leaders in preserving vascular access and improving the safety and comfort of infusion therapy. Copyright 2010 Elsevier Inc. All rights reserved.

  16. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  17. Liquid secondary waste: Waste form formulation and qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A. D.; Dixon, K. L.; Hill, K. A.

    The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, including Direct Feed Low Activity Waste (DFLAW) vitrification, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. The powdered salt waste form produced by the ETF will be replaced by a stabilized solidified waste form for disposal in Hanford’s Integrated Disposal Facility (IDF). Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilizationmore » Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the IDF. Waste form testing to support this plan is composed of work in the near term to provide data as input to a performance assessment (PA) for Hanford’s IDF. In 2015, three Hanford Liquid Secondary Waste simulants were developed based on existing and projected waste streams. Using these waste simulants, fourteen mixes of Hanford Liquid Secondary Waste were prepared and tested varying the waste simulant, the water-to-dry materials ratio, and the dry materials blend composition.1 In FY16, testing was performed using a simulant of the EMF process condensate blended with the caustic scrubber—from the Low Activity Waste (LAW) melter—, processed through the ETF. The initial EMF-16 simulant will be based on modeling efforts performed to determine the mass balance of the ETF for the DFLAW.2 The compressive strength of all of the mixes exceeded the target of 3.4 MPa (500 psi) to meet the requirements identified as potential IDF Waste Acceptance Criteria in Table 1 of the Secondary Liquid Waste Immobilization Technology Development Plan.3 The hydraulic properties of the waste forms tested (hydraulic conductivity and water characteristic curves) were comparable to the properties measured on the Savannah River Site (SRS) Saltstone waste form. Future testing should include efforts to first; 1) determine the rate and amount of ammonia released during each unit operation of the treatment process to determine if additional ammonia management is required, then; 2) reduce the ammonia content of the ETF concentrated brine prior to solidification, making the waste more amenable to grouting, or 3) manage the release of ammonia during production and ongoing release during storage of the waste form, or 4) develop a lower pH process/waste form thereby precluding ammonia release.« less

  18. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  19. Treatment of Asbestos Wastes Using the GeoMelt Vitrification Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finucane, K.G.; Thompson, L.E.; Abuku, T.

    The disposal of waste asbestos from decommissioning activities is becoming problematic in countries which have limited disposal space. A particular challenge is the disposal of asbestos wastes from the decommissioning of nuclear sites because some of it is radioactively contaminated or activated and disposal space for such wastes is limited. GeoMelt{sup R} vitrification is being developed as a treatment method for volume and toxicity minimization and radionuclide immobilization for UK radioactive asbestos mixed waste. The common practice to date for asbestos wastes is disposal in licensed landfills. In some cases, compaction techniques are used to minimize the disposal space requirements.more » However, such practices are becoming less practical. Social pressures have resulted in changes to disposal regulations which, in turn, have resulted in the closure of some landfills and increased disposal costs. In the UK, tens of thousands of tonnes of asbestos waste will result from the decommissioning of nuclear sites over the next 20 years. In Japan, it is estimated that over 40 million tonnes of asbestos materials used in construction will require disposal. Methods for the safe and cost effective volume reduction of asbestos wastes are being evaluated for many sites. The GeoMelt{sup R} vitrification process is being demonstrated at full-scale in Japan for the Japan Ministry of Environment and plans are being developed for the GeoMelt treatment of UK nuclear site decommissioning-related asbestos wastes. The full-scale treatment operations in Japan have also included contaminated soils and debris. The GeoMelt{sup R} vitrification process result in the maximum possible volume reduction, destroys the asbestos fibers, treats problematic debris associated with asbestos wastes, and immobilizes radiological contaminants within the resulting glass matrix. Results from recent full-scale treatment operations in Japan are discussed and plans for GeoMelt treatment of UK nuclear site decommissioning-related asbestos wastes are outlined. (authors)« less

  20. Site Plan, Brief History, Site Elevation, Main Gate Detail, Southern ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan, Brief History, Site Elevation, Main Gate Detail, Southern Live Oak (Quercus Virginiana) Information - Main Gate and Auburn Oaks at Toomer's Corner, Entrance to Auburn University's Campus, Intersection of West Magnolia Avenue and South College Street, Auburn, Lee County, AL

  1. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  2. The UNAVCO role in planning, building, and maintaining geodetic infrastructure across the Americas: update on PBO, COCONet, and TLALOCNet

    NASA Astrophysics Data System (ADS)

    Mattioli, G. S.; Braun, J. J.; Cabral, E.; Calais, E.; DeMets, C.; Feaux, K.; Mencin, D.; Miller, M. M.; Normandeau, J.; Serra, Y.; Wang, G.

    2013-05-01

    UNAVCO maintains the NSF-funded Plate Boundary Observatory (PBO), which is the geodetic facility of EarthScope. PBO is largest continuous GPS and borehole geophysical network in the Americas, with ~1130 cGPS sites, including several with multiple monuments, ~80 boreholes, with 75 tensor strainmeters, 79 short-period, 3-component seismometers, and pore pressure sensors at 23 sites. PBO also includes 26 tiltmeters deployed at several volcanoes. Surface meteorological sensors are collocated at 134 GPS sites. UNAVCO provides high-rate (1 Hz), low-latency (<1 s) GPS data streams (RT-GPS) from 348 stations in PBO and has delivered over 62 Tb of geodetic data since PBO's inception in 2004. COCONet is a multi-hazard GPS-Met observatory, which extends PBO infrastructure into the Caribbean basin. In 2010, UNAVCO in collaboration with UCAR, was funded by NSF to build and initially maintain a network of 50 new cGPS/Met sites and incorporate another 50 existing sites in the Caribbean region. The revised siting plan calls for 46 new, 21 refurbished, and 77 existing stations spanning 26 nations in the Caribbean. Data from COCONet sites flow into the UNAVCO archive and are processed by the PBO analysis centers. Three workshops have helped to foster a COCONet science community and provide important guidance to UNAVCO to assure success of this complex multi-national project. A new joint UNAVCO-Mexican multi-hazard GPS-Met observatory, called TLALOCNet, has been proposed based on the outcomes of a NSF-funded workshop held in Puerto Vallarta in 2010. The TLALOCNet plan calls for UNAVCO to install 9 new PBO-quality GPS-Met sites in Mexico and adjacent islands, upgrade 29 sites previously installed with NSF funding along the western subduction boundary, and coordinate with the Mexican National Meteorological Service to federate data from at least another 80 GPS-Met sites distributed across Mexico. All GPS-Met data from TLALOCNet will be freely available at the UNAVCO archive and Mexican mirror sites. The ultimate goal for these networks is to provide free, high-quality, low-latency data and data products for researchers, educators, students, and the private sector. Data from COCONet and TLALOCNet will be used by US and international scientists to study solid earth processes, for example plate kinematics and dynamic as well as plate boundary interactions and deformation, with an emphasis on the earthquake cycle. The networks also serve atmospheric science objectives by providing more precise estimates of tropospheric water vapor thus enabling better forecast of the dynamics of airborne moisture associated with the yearly Caribbean hurricane cycle.

  3. Kombucha brewing under the Food and Drug Administration model Food Code: risk analysis and processing guidance.

    PubMed

    Nummer, Brian A

    2013-11-01

    Kombucha is a fermented beverage made from brewed tea and sugar. The taste is slightly sweet and acidic and it may have residual carbon dioxide. Kombucha is consumed in many countries as a health beverage and it is gaining in popularity in the U.S. Consequently, many retailers and food service operators are seeking to brew this beverage on site. As a fermented beverage, kombucha would be categorized in the Food and Drug Administration model Food Code as a specialized process and would require a variance with submission of a food safety plan. This special report was created to assist both operators and regulators in preparing or reviewing a kombucha food safety plan.

  4. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  5. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  6. Frac Sand Mines Are Preferentially Sited in Unzoned Rural Areas.

    PubMed

    Locke, Christina

    2015-01-01

    Shifting markets can cause unexpected, stochastic changes in rural landscapes that may take local communities by surprise. Preferential siting of new industrial facilities in poor areas or in areas with few regulatory restrictions can have implications for environmental sustainability, human health, and social justice. This study focuses on frac sand mining-the mining of high-quality silica sand used in hydraulic fracturing processes for gas and oil extraction. Frac sand mining gained prominence in the 2000s in the upper midwestern United States where nonmetallic mining is regulated primarily by local zoning. I asked whether frac sand mines were more commonly sited in rural townships without formal zoning regulations or planning processes than in those that undertook zoning and planning before the frac sand boom. I also asked if mine prevalence was correlated with socioeconomic differences across townships. After creating a probability surface to map areas most suitable for frac sand mine occurrence, I developed neutral landscape models from which to compare actual mine distributions in zoned and unzoned areas at three different spatial extents. Mines were significantly clustered in unzoned jurisdictions at the statewide level and in 7 of the 8 counties with at least three frac sand mines and some unzoned land. Subsequent regression analyses showed mine prevalence to be uncorrelated with land value, tax rate, or per capita income, but correlated with remoteness and zoning. The predicted mine count in unzoned townships was over two times higher than that in zoned townships. However, the county with the most mines by far was under a county zoning ordinance, perhaps indicating industry preferences for locations with clear, homogenous rules over patchwork regulation. Rural communities can use the case of frac sand mining as motivation to discuss and plan for sudden land-use predicaments, rather than wait to grapple with unfamiliar legal processes during a period of intense conflict.

  7. Frac Sand Mines Are Preferentially Sited in Unzoned Rural Areas

    PubMed Central

    Locke, Christina

    2015-01-01

    Shifting markets can cause unexpected, stochastic changes in rural landscapes that may take local communities by surprise. Preferential siting of new industrial facilities in poor areas or in areas with few regulatory restrictions can have implications for environmental sustainability, human health, and social justice. This study focuses on frac sand mining—the mining of high-quality silica sand used in hydraulic fracturing processes for gas and oil extraction. Frac sand mining gained prominence in the 2000s in the upper midwestern United States where nonmetallic mining is regulated primarily by local zoning. I asked whether frac sand mines were more commonly sited in rural townships without formal zoning regulations or planning processes than in those that undertook zoning and planning before the frac sand boom. I also asked if mine prevalence was correlated with socioeconomic differences across townships. After creating a probability surface to map areas most suitable for frac sand mine occurrence, I developed neutral landscape models from which to compare actual mine distributions in zoned and unzoned areas at three different spatial extents. Mines were significantly clustered in unzoned jurisdictions at the statewide level and in 7 of the 8 counties with at least three frac sand mines and some unzoned land. Subsequent regression analyses showed mine prevalence to be uncorrelated with land value, tax rate, or per capita income, but correlated with remoteness and zoning. The predicted mine count in unzoned townships was over two times higher than that in zoned townships. However, the county with the most mines by far was under a county zoning ordinance, perhaps indicating industry preferences for locations with clear, homogenous rules over patchwork regulation. Rural communities can use the case of frac sand mining as motivation to discuss and plan for sudden land-use predicaments, rather than wait to grapple with unfamiliar legal processes during a period of intense conflict. PMID:26136238

  8. A needs analysis method for land-use planning of illegal dumping sites: a case study in Aomori-Iwate, Japan.

    PubMed

    Ishii, Kazuei; Furuichi, Toru; Nagao, Yukari

    2013-02-01

    Land use at contaminated sites, following remediation, is often needed for regional redevelopment. However, there exist few methods of developing economically and socially feasible land-use plans based on regional needs because of the wide variety of land-use requirements. This study proposes a new needs analysis method for the conceptual land-use planning of contaminated sites and illustrates this method with a case study of an illegal dumping site for hazardous waste. In this method, planning factors consisting of the land-use attributes and related facilities are extracted from the potential needs of the residents through a preliminary questionnaire. Using the extracted attributes of land use and the related facilities, land-use cases are designed for selection-based conjoint analysis. A second questionnaire for respondents to the first one who indicated an interest in participating in the second questionnaire is conducted for the conjoint analysis to determine the utility function and marginal cost of each attribute in order to prioritize the planning factors to develop a quantitative and economically and socially feasible land-use plan. Based on the results, site-specific land-use alternatives are developed and evaluated by the utility function obtained from the conjoint analysis. In this case study of an illegal dumping site for hazardous waste, the uses preferred as part of a conceptual land-use plan following remediation of the site were (1) agricultural land and a biogas plant designed to recover energy from biomass or (2) a park with a welfare facility and an athletic field. Our needs analysis method with conjoint analysis is applicable to the development of conceptual land-use planning for similar sites following remediation, particularly when added value is considered. Copyright © 2012 Elsevier Ltd. All rights reserved.

  9. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  10. Facility effluent monitoring plan for the plutonium uranium extraction facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiegand, D.L.

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less

  11. Tanks Focus Area Site Needs Assessment - FY 2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.

    2001-04-30

    The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less

  12. 28. Site Plan: AF Station P67, Fort Custer, Michigan, Plot ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Site Plan: AF Station P-67, Fort Custer, Michigan, Plot Plan (to accompany FY 1956 project planning report), USACOE, 22 July 1954. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  13. Project M: Scale Model of Lunar Landing Site of Apollo 17

    NASA Technical Reports Server (NTRS)

    O'Brien, Hollie; Crain, Timothy P.

    2010-01-01

    The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize approach phase, terminal descent phase, and surface phase operations on the physical model. The project had an additional requirement that was also satisfied: the granite table the model was placed on must be returnable to its original condition if needed in the future.

  14. 21 CFR 822.35 - Can you inspect my manufacturing site or other sites involved in my postmarket surveillance plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Can you inspect my manufacturing site or other sites involved in my postmarket surveillance plan? 822.35 Section 822.35 Food and Drugs FOOD AND DRUG... Records and Reports § 822.35 Can you inspect my manufacturing site or other sites involved in my...

  15. Predicting on-site environmental impacts of municipal engineering works

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less

  16. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  17. REopt: A Platform for Energy System Integration and Optimization: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpkins, T.; Cutler, D.; Anderson, K.

    2014-08-01

    REopt is NREL's energy planning platform offering concurrent, multi-technology integration and optimization capabilities to help clients meet their cost savings and energy performance goals. The REopt platform provides techno-economic decision-support analysis throughout the energy planning process, from agency-level screening and macro planning to project development to energy asset operation. REopt employs an integrated approach to optimizing a site?s energy costs by considering electricity and thermal consumption, resource availability, complex tariff structures including time-of-use, demand and sell-back rates, incentives, net-metering, and interconnection limits. Formulated as a mixed integer linear program, REopt recommends an optimally-sized mix of conventional and renewable energy, andmore » energy storage technologies; estimates the net present value associated with implementing those technologies; and provides the cost-optimal dispatch strategy for operating them at maximum economic efficiency. The REopt platform can be customized to address a variety of energy optimization scenarios including policy, microgrid, and operational energy applications. This paper presents the REopt techno-economic model along with two examples of recently completed analysis projects.« less

  18. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig

    2013-07-01

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysicsmore » and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)« less

  19. Verbal autopsy: current practices and challenges.

    PubMed Central

    Soleman, Nadia; Chandramohan, Daniel; Shibuya, Kenji

    2006-01-01

    Cause-of-death data derived from verbal autopsy (VA) are increasingly used for health planning, priority setting, monitoring and evaluation in countries with incomplete or no vital registration systems. In some regions of the world it is the only method available to obtain estimates on the distribution of causes of death. Currently, the VA method is routinely used at over 35 sites, mainly in Africa and Asia. In this paper, we present an overview of the VA process and the results of a review of VA tools and operating procedures used at demographic surveillance sites and sample vital registration systems. We asked for information from 36 field sites about field-operating procedures and reviewed 18 verbal autopsy questionnaires and 10 cause-of-death lists used in 13 countries. The format and content of VA questionnaires, field-operating procedures, cause-of-death lists and the procedures to derive causes of death from VA process varied substantially among sites. We discuss the consequences of using varied methods and conclude that the VA tools and procedures must be standardized and reliable in order to make accurate national and international comparisons of VA data. We also highlight further steps needed in the development of a standard VA process. PMID:16583084

  20. Solar industrial process heat: A study of applications and attitudes

    NASA Astrophysics Data System (ADS)

    Wilson, V.

    1981-04-01

    Data were gathered through site visits to 100 industrial plants. The site specific data suggests several possible near term market opportunities for solar thermal energy systems. Plants using electricity as their primary fuel for industrial process heat were identified, on the basis of their high fuel prices, as attractive early entry markets for solar energy. Additional opportunities were reflected in plants that had accomplished much of their conservation plans, or bad sizeable percentages of their operating budgets committed to energy expenses. A suitability analysis identified eleven industrial plants as highly suitable for solar thermal applications, they included producers of fluid milk, pottery, canned and bottled soft drinks, fabricated structural metal, refined petroleum, aluminum cans, chrome and nickel plating and stamped frame metal and metal finishings.

  1. 75 FR 27997 - Record of Decision (ROD) for the Development and Implementation of Range-Wide Mission and Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... (FEIS), including the following proposed land use changes: expansion of the Main Post and alterations in..., and increase in the level of test activities; development of six new Specialized Areas (four for test... Strategy Plan and siting process for facilitating future tests and training activities at WSMR; and...

  2. Wet feet and sappy fingers: lessons learned from restoration work in the West Virginia highlands

    Treesearch

    Amy Cimarolli; David W. Saville

    2010-01-01

    This presentation summarizes our practical experiences from a decade of working with state and federal agencies and private landowners to protect, conserve, and restore the spruce forests and fir swamps of West Virginia. We present case studies that demonstrate the collaborative planning processes, site selection techniques, and restoration activities used in our...

  3. Gas Hydrate Research Site Selection and Operational Research Plans

    NASA Astrophysics Data System (ADS)

    Collett, T. S.; Boswell, R. M.

    2009-12-01

    In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a comprehensive set of logging-while-drilling (LWD) data through expected gas-hydrate-bearing sand reservoirs in seven wells at three sites in the Gulf of Mexico. The discovery of thick hydrate-bearing sands at two of the sites drilled in the Gulf Mexico validated the integrated geological and geophysical approach used in the pre-drill site selection process to identify gas hydrate reservoirs that may be conducive to energy production. The results of the GOM JIP Leg II LWD expedition are also being used to support the selection of sites for a future drilling, logging, and coring program. Operationally, recent drilling programs, such as ODP Leg 204, IODP Expedition 311, the Japanese Toaki-oki to Kumano-nada drilling leg, the Indian NGHP Expedition 01, and the South Korean Gas Hydrate Research and Development Organization Expedition 01 have demonstrated the great benefit of a multi-leg drilling approach, including the initial acquisition of LWD data that was used to then select sites for the drilling of complex core and wireline logging test holes. It is obvious that a fully integrated site selection approach and a “goal based” operational plan, possibly including numerous drill sites and drilling legs, are required considerations for any future gas hydrate research project.

  4. 17. Photographic copy of intial site plan for North Base: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of intial site plan for North Base: AF Job No. 1045, Military Construction: Muroc Bombing Range, Muroc Lake, California; Materiel Test Site: Location Plan, Sheet No. 1 of 11, May 1942. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  5. MTI science, data products, and ground-data processing overview

    NASA Astrophysics Data System (ADS)

    Szymanski, John J.; Atkins, William H.; Balick, Lee K.; Borel, Christoph C.; Clodius, William B.; Christensen, R. Wynn; Davis, Anthony B.; Echohawk, J. C.; Galbraith, Amy E.; Hirsch, Karen L.; Krone, James B.; Little, Cynthia K.; McLachlan, Peter M.; Morrison, Aaron; Pollock, Kimberly A.; Pope, Paul A.; Novak, Curtis; Ramsey, Keri A.; Riddle, Emily E.; Rohde, Charles A.; Roussel-Dupre, Diane C.; Smith, Barham W.; Smith, Kathy; Starkovich, Kim; Theiler, James P.; Weber, Paul G.

    2001-08-01

    The mission of the Multispectral Thermal Imager (MTI) satellite is to demonstrate the efficacy of highly accurate multispectral imaging for passive characterization of urban and industrial areas, as well as sites of environmental interest. The satellite makes top-of-atmosphere radiance measurements that are subsequently processed into estimates of surface properties such as vegetation health, temperatures, material composition and others. The MTI satellite also provides simultaneous data for atmospheric characterization at high spatial resolution. To utilize these data the MTI science program has several coordinated components, including modeling, comprehensive ground-truth measurements, image acquisition planning, data processing and data interpretation and analysis. Algorithms have been developed to retrieve a multitude of physical quantities and these algorithms are integrated in a processing pipeline architecture that emphasizes automation, flexibility and programmability. In addition, the MTI science team has produced detailed site, system and atmospheric models to aid in system design and data analysis. This paper provides an overview of the MTI research objectives, data products and ground data processing.

  6. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  7. Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Middleman, L.I.

    1990-06-01

    This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less

  8. Planning and acquiring a national center for the United States Geological Survey

    USGS Publications Warehouse

    Schmidt, William A.

    1993-01-01

    This history of building a National Center for the U.S. Geological Survey is a "nuts and bolts" account of the planning, design and construction, forgotten happenings, and frustrations in the planning and authorization process, and the political and other considerations which played a significant role in the culmination of a dream about a National Center for the Geological Survey. This documented data of unique procedures in the acquisition and financing of Federal buildings, the choice and development of the building site, and its location as a contribution to the enhancement of the "new town" concept of the 1960's in the planning and development of the National Capital Area, may well provide guidance in the future to those who have to decide whether a building of true worth should be preserved.

  9. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  10. Visual Assessment on Coastal Cruise Tourism: A Preliminary Planning Using Importance Performance Analysis

    NASA Astrophysics Data System (ADS)

    Trisutomo, S.

    2017-07-01

    Importance-Performance Analysis (IPA) has been widely applied in many cases. In this research, IPA was applied to measure perceive on coastal tourism objects and its possibility to be developed as coastal cruise tourism in Makassar. Three objects, i.e. Akkarena recreational site, Losari public space at waterfront, and Paotere traditional Phinisi ships port, were selected and assessed visually from water area by a group of purposive resource persons. The importance and performance of 10 attributes of each site were scored using Likert scale from 1 to 5. Data were processed by SPSS-21 than resulted Cartesian graph which the scores were divided in four quadrants: Quadrant I concentric here, Quadrant II keep up the good work, Quadrant III low priority, and Quadrant IV possible overkill. The attributes in each quadrant could be considered as the platform for preliminary planning of coastal cruise tour in Makassar

  11. Multiscale analysis of restoration priorities for marine shoreline planning.

    PubMed

    Diefenderfer, Heida L; Sobocinski, Kathryn L; Thom, Ronald M; May, Christopher W; Borde, Amy B; Southard, Susan L; Vavrinec, John; Sather, Nichole K

    2009-10-01

    Planners are being called on to prioritize marine shorelines for conservation status and restoration action. This study documents an approach to determining the management strategy most likely to succeed based on current conditions at local and landscape scales. The conceptual framework based in restoration ecology pairs appropriate restoration strategies with sites based on the likelihood of producing long-term resilience given the condition of ecosystem structures and processes at three scales: the shorezone unit (site), the drift cell reach (nearshore marine landscape), and the watershed (terrestrial landscape). The analysis is structured by a conceptual ecosystem model that identifies anthropogenic impacts on targeted ecosystem functions. A scoring system, weighted by geomorphic class, is applied to available spatial data for indicators of stress and function using geographic information systems. This planning tool augments other approaches to prioritizing restoration, including historical conditions and change analysis and ecosystem valuation.

  12. Don't fight the site: three geomorphic considerations in catchment-scale river rehabilitation planning.

    PubMed

    Brierley, Gary; Fryirs, Kirstie

    2009-06-01

    Three geomorphic considerations that underpin the design and implementation of realistic and strategic river conservation and rehabilitation programs that work with the nature are outlined. First, the importance of appreciating the inherent diversity of river forms and processes is discussed. Second, river dynamics are appraised, framing the contemporary behavioral regime of a reach in relation to system evolution to explain changes to river character and behavior over time. Third, the trajectory of a reach is framed in relation to downstream patterns of river types, analyzing landscape connectivity at the catchment scale to interpret geomorphic river recovery potential. The application of these principles is demonstrated using extensive catchment-scale analyses of geomorphic river responses to human disturbance in the Bega and Upper Hunter catchments in southeastern Australia. Differing implications for reach- and catchment-scale rehabilitation planning prompt the imperative that management practices work with nature rather than strive to 'fight the site.'

  13. Washing and caustic leaching of Hanford tank sludges: results of FY 1996 studies. Revision

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lumetta, G.J.; Rapko, B.M.; Wagner, M.J.

    During the past few years, the primary mission at the US Department of Energy`s Hanford Site has changed from producing plutonium to restoring the environment. Large volumes of high-level radioactive wastes (HLW), generated during past Pu production and other operations, are stored in underground tanks on site. The current plan for remediating the Hanford tank farms consists of waste retrieval, pretreatment, treatment (immobilization), and disposal. The HLW will be immobilized in a borosilicate glass matrix and then disposed of in a geologic repository. Because of the expected high cost of HLW vitrification and geologic disposal, pretreatment processes will be implementedmore » to reduce the volume of borosilicate glass produced in disposing of the tank wastes. On this basis, a pretreatment plan is being developed. This report describes the sludge washing and caustic leaching test conducted to create a Hanford tank sludge pretreatment flowsheet.« less

  14. Intergenerational equity and long-term stewardship plans.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hocking, E. K.

    2002-02-05

    For an untold number of contaminated sites throughout the world, stewardship will be inevitable. For many such sites, stewardship will be a reasonable approach because of the uncertainties associated with present and future site conditions and site contaminants, the limited performance of available technologies, the nonavailability of technologies, and the risk and cost associated with complete cleanup. Regardless of whether stewardship is a realistic approach to site situations or simply a convenient default, it could be required at most contaminated sites for multiple generations. Because the stewardship plan is required to protect the release of hazardous contaminants to the environment,more » some use restrictions will be put in place to provide that protection. These use restrictions will limit access to resources for as long as the protection is required. The intergenerational quality of long-term stewardship plans and their inherent limitations on resource use require that they be designed to achieve equity among the affected generations. Intergenerational equity, defined here as the fairness of access to resources across generations, could be achieved through a well-developed stewardship plan that provides future generations with the information they need to make wise decisions about resource use. Developing and implementing such a plan would take into account the failure mechanisms of the plan's components, feature short stewardship time blocks that would allow for periodic reassessments of the site and of the stewardship program's performance, and provide present and future generations with necessary site information.« less

  15. Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.; Mertesdorf, E.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less

  16. Site 300 SPCC Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less

  17. LAKE PONTCHARTRAIN ESTUARY CONSERVATION PLAN

    EPA Science Inventory

    The Nature Conservancy will conduct a series of a least four science expert workshops to develop a Site Conservation Plan for the Lake Pontchartrain Estuary and adjacent wetlands. The objective of the Site Conservation Plan is to identify conservation targets, threats or stresse...

  18. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  19. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  20. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  1. Frederick Law Olmsted National Historic Site : transportation study

    DOT National Transportation Integrated Search

    2011-02-01

    This study provide concepts and ideas for a complementary transportation plan in support of the revised General Management Plan (GMP) for the Frederick Law Olmsted National Historic Site. The GMP sets forth a preferred plan of action for how Olmsted ...

  2. 3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  3. Ohio's Abandoned Mine Lands Reclamation Program: a Study of Data Collection and Evaluation Techniques

    NASA Technical Reports Server (NTRS)

    Sperry, S. L.

    1982-01-01

    The planning process for a statewide reclamation plan of Ohio abandoned minelands in response to the Federal Surface Mining Control and Reclamation Act of 1977 included: (1) the development of a screening and ranking methodology; (2) the establishment of a statewide review of major watersheds affected by mining; (3) the development of an immediate action process; and (4) a prototypical study of a priority watershed demonstrating the data collection, analysis, display and evaluation to be used for the remaining state watersheds. Historical methods for satisfying map information analysis and evaluation, as well as current methodologies being used were discussed. Various computer mapping and analysis programs were examined for their usability in evaluating the priority reclamation sites. Hand methods were chosen over automated procedures; intuitive evaluation was the primary reason.

  4. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH),more » Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.« less

  5. A Comprehensive Plan for the Long-Term Calibration and Validation of Oceanic Biogeochemical Satellite Data

    NASA Technical Reports Server (NTRS)

    Hooker, Stanford B.; McClain, Charles R.; Mannino, Antonio

    2007-01-01

    The primary objective of this planning document is to establish a long-term capability and validating oceanic biogeochemical satellite data. It is a pragmatic solution to a practical problem based primarily o the lessons learned from prior satellite missions. All of the plan's elements are seen to be interdependent, so a horizontal organizational scheme is anticipated wherein the overall leadership comes from the NASA Ocean Biology and Biogeochemistry (OBB) Program Manager and the entire enterprise is split into two components of equal sature: calibration and validation plus satellite data processing. The detailed elements of the activity are based on the basic tasks of the two main components plus the current objectives of the Carbon Cycle and Ecosystems Roadmap. The former is distinguished by an internal core set of responsibilities and the latter is facilitated through an external connecting-core ring of competed or contracted activities. The core elements for the calibration and validation component include a) publish protocols and performance metrics; b) verify uncertainty budgets; c) manage the development and evaluation of instrumentation; and d) coordinate international partnerships. The core elements for the satellite data processing component are e) process and reprocess multisensor data; f) acquire, distribute, and archive data products; and g) implement new data products. Both components have shared responsibilities for initializing and temporally monitoring satellite calibration. Connecting-core elements include (but are not restricted to) atmospheric correction and characterization, standards and traceability, instrument and analysis round robins, field campaigns and vicarious calibration sites, in situ database, bio-optical algorithm (and product) validation, satellite characterization and vicarious calibration, and image processing software. The plan also includes an accountability process, creating a Calibration and Validation Team (to help manage the activity), and a discussion of issues associated with the plan's scientific focus.

  6. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility wasmore » needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)« less

  7. SAMPLING OF CONTAMINATED SITES

    EPA Science Inventory

    A critical aspect of characterization of the amount and species of contamination of a hazardous waste site is the sampling plan developed for that site. f the sampling plan is not thoroughly conceptualized before sampling takes place, then certain critical aspects of the limits o...

  8. IRQN award paper: Operational rounds: a practical administrative process to improve safety and clinical services in radiology.

    PubMed

    Donnelly, Lane F; Dickerson, Julie M; Lehkamp, Todd W; Gessner, Kevin E; Moskovitz, Jay; Hutchinson, Sally

    2008-11-01

    As part of a patient safety program in the authors' department of radiology, operational rounds have been instituted. This process consists of radiology leaders' visiting imaging divisions at the site of imaging and discussing frontline employees' concerns about patient safety, the quality of care, and patient and family satisfaction. Operational rounds are executed at a time to optimize the number of attendees. Minutes that describe the issues identified, persons responsible for improvement, and updated improvement plan status are available to employees online. Via this process, multiple patient safety and other issues have been identified and remedied. The authors believe that the process has improved patient safety, the quality of care, and the efficiency of operations. Since the inception of the safety program, the mean number of days between serious safety events involving radiology has doubled. The authors review the background around such walk rounds, describe their particular program, and give multiple illustrative examples of issues identified and improvement plans put in place.

  9. KSC ground operations planning for Space Station

    NASA Technical Reports Server (NTRS)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  10. Does Wildfire Open a Policy Window? Local Government and Community Adaptation After Fire in the United States.

    PubMed

    Mockrin, Miranda H; Fishler, Hillary K; Stewart, Susan I

    2018-05-15

    Becoming a fire adapted community that can coexist with wildfire is envisioned as a continuous, iterative process of adaptation, but it is unclear how communities may pursue adaptation. Experience with wildfire and other natural hazards suggests that disasters may open a "window of opportunity" leading to local government policy changes. We examined how destructive wildfire affected progress toward becoming fire adapted in eight locations in the United States. We found that community-level adaptation following destructive fires is most common where destructive wildfire is novel and there is already government capacity and investment in wildfire regulation and land use planning. External funding, staff capacity, and the presence of issue champions combined to bring about change after wildfire. Locations with long histories of destructive wildfire, extensive previous investment in formal wildfire regulation and mitigation, or little government and community capacity to manage wildfire saw fewer changes. Across diverse settings, communities consistently used the most common tools and actions for wildfire mitigation and planning. Nearly all sites reported changes in wildfire suppression, emergency response, and hazard planning documents. Expansion in voluntary education and outreach programs to increase defensible space was also common, occurring in half of our sites, but land use planning and regulations remained largely unchanged. Adaptation at the community and local governmental level therefore may not axiomatically follow from each wildfire incident, nor easily incorporate formal approaches to minimizing land use and development in hazardous environments, but in many sites wildfire was a focusing event that inspired reflection and adaptation.

  11. Opportunities and challenges of integrating ecological restoration into assessment and management of contaminated ecosystems.

    PubMed

    Hull, Ruth N; Luoma, Samuel N; Bayne, Bruce A; Iliff, John; Larkin, Daniel J; Paschke, Mark W; Victor, Sasha L; Ward, Sara E

    2016-04-01

    Ecosystem restoration planning near the beginning of the site assessment and management process ("early integration") involves consideration of restoration goals from the outset in developing solutions for contaminated ecosystems. There are limitations to integration that stem from institutional barriers, few successful precedents, and limited availability of guidance. Challenges occur in integrating expertise from various disciplines and multiple, sometimes divergent interests and goals. The more complex process can result in timing, capacity, communication, and collaboration challenges. On the other hand, integrating the 2 approaches presents new and creative opportunities. For example, integration allows early planning for expanding ecosystem services on or near contaminated lands or waters that might otherwise have been unaddressed by remediation alone. Integrated plans can explicitly pursue ecosystem services that have market value, which can add to funds for long-term monitoring and management. Early integration presents opportunities for improved and productive collaboration and coordination between ecosystem restoration and contaminant assessment and management. Examples exist where early integration facilitates liability resolution and generates positive public relations. Restoration planning and implementation before the completion of the contaminated site assessment, remediation, or management process ("early restoration") can facilitate coordination with offsite restoration options and a regional approach to restoration of contaminated environments. Integration of performance monitoring, for both remedial and restoration actions, can save resources and expand the interpretive power of results. Early integration may aid experimentation, which may be more feasible on contaminated lands than in many other situations. The potential application of concepts and tools from adaptive management is discussed as a way of avoiding pitfalls and achieving benefits in early integration. In any case, there will be challenges with early integration of restoration concepts for contaminated ecosystems, but the benefits are likely to outweigh them. © 2015 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  12. Health plan competition in local markets.

    PubMed

    Grossman, J M

    2000-04-01

    To examine the structure of local health insurance markets and the strategies health plans were using to respond to competitive pressures in local markets in 1996/1997. Community Tracking Study site visits conducted between May 1996 and April 1997 in 12 U.S. markets selected to be nationally representative. In each site, 36 to 60 interviews on local health system change were conducted with healthcare industry informants representing health plans, providers, and purchasers. Relevant data for this article were abstracted from standardized protocols administered to multiple respondents in each site. Although the competitive threat from national plans was pervasive, local plans in most sites continued to retain strong, often dominant, positions in historically concentrated markets. In all sites, in response to purchaser pressures for stable premiums and provider choice, and the threat of entry and to plans were using three strategies to increase market share and market power: (1) consolidation/geographic expansion, (2) price competition, and (3) product line/segment diversification that focused on broad networks and open-access products. In most markets, in response to the demand for provider choice, the trend was away from ownership and exclusive arrangements with providers. Although local plans were moving to become full-service regional players, there was uncertainty about the abilities of all plans to sustain growth strategies at the expense of margins and organizational stability, and to effectively manage care with broad networks.

  13. SU-E-J-78: Adaptive Planning Workflow in a Pencil Beam Scanning Proton Therapy Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blakey, M; Price, S; Robison, B

    Purpose: The susceptibility of proton therapy to changes in patient setup and anatomy necessitates an adaptive planning process. With the right planning tools and clinical workflow, an adaptive plan can be created in a timely manner without adding significant workload to the treatment planning staff. Methods: In our center, a weekly QA CT is performed on most patients to assess setup, anatomy change, and tumor response. The QA CT is fused to the treatment planning CT, the contours are transferred via deformable registration, and the plan dose is recalculated on the QA CT. A physicist assesses the dose distribution, andmore » an adaptive plan is requested based on tumor coverage or OAR dose changes. After the physician confirms or alters the deformed contours, a dosimetrist develops an adaptive plan using our TPS adaptation module. The plan is assessed for robustness and is then reviewed by the physician. Patient QA is performed within three days following the first adapted treatment. Results: Of the patients who received QA CTs, 19% required at least one adaptive plan (18.5% H&N, 18.5% brain, 11.1% breast, 14.8% chestwall, 14.8% lung, 18.5% pelvis and 3.8% abdomen). Of these patients, 14% went on a break, while the remainder was treated with the previous plan during the re-planning process. Adaptive plans were performed based on tumor shrinkage, anatomy change or positioning uncertainties for 37.9%, 44.8%, and 17.3% of the patients, respectively. On average, 3 full days are required between the QA CT and the first adapted plan treatment. Conclusion: Adaptive planning is a crucial component of proton therapy and should be applied to any site when the QA CT shows significant deviation from the plan. With an efficient workflow, an adaptive plan can be applied without delaying patient treatment or burdening the dosimetry and medical physics team.« less

  14. Reference manual for toxicity and exposure assessment and risk characterization. CERCLA Baseline Risk Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing themore » extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.« less

  15. Metamodeling-based approach for risk assessment and cost estimation: Application to geological carbon sequestration planning

    NASA Astrophysics Data System (ADS)

    Sun, Alexander Y.; Jeong, Hoonyoung; González-Nicolás, Ana; Templeton, Thomas C.

    2018-04-01

    Carbon capture and storage (CCS) is being evaluated globally as a geoengineering measure for significantly reducing greenhouse emission. However, long-term liability associated with potential leakage from these geologic repositories is perceived as a main barrier of entry to site operators. Risk quantification and impact assessment help CCS operators to screen candidate sites for suitability of CO2 storage. Leakage risks are highly site dependent, and a quantitative understanding and categorization of these risks can only be made possible through broad participation and deliberation of stakeholders, with the use of site-specific, process-based models as the decision basis. Online decision making, however, requires that scenarios be run in real time. In this work, a Python based, Leakage Assessment and Cost Estimation (PyLACE) web application was developed for quantifying financial risks associated with potential leakage from geologic carbon sequestration sites. PyLACE aims to assist a collaborative, analytic-deliberative decision making processes by automating metamodel creation, knowledge sharing, and online collaboration. In PyLACE, metamodeling, which is a process of developing faster-to-run surrogates of process-level models, is enabled using a special stochastic response surface method and the Gaussian process regression. Both methods allow consideration of model parameter uncertainties and the use of that information to generate confidence intervals on model outputs. Training of the metamodels is delegated to a high performance computing cluster and is orchestrated by a set of asynchronous job scheduling tools for job submission and result retrieval. As a case study, workflow and main features of PyLACE are demonstrated using a multilayer, carbon storage model.

  16. Exercises in Emergency Preparedness for Health Professionals in Community Clinics

    PubMed Central

    Blossom, H. John; Sandrock, Christian; Mitchell, Brenda; Brandstein, Kendra

    2010-01-01

    Health professionals in community settings are generally unprepared for disasters. From 2006 to 2008 the California Statewide Area Health Education Center (AHEC) program conducted 90 table top exercises in community practice sites in 18 counties. The exercises arranged and facilitated by AHEC trained local coordinators and trainers were designed to assist health professionals in developing and applying their practice site emergency plans using simulated events about pandemic influenza or other emergencies. Of the 1,496 multidisciplinary health professionals and staff participating in the exercises, 1,176 (79%) completed learner evaluation forms with 92–98% of participants rating the training experiences as good to excellent. A few reported helpful effects when applying their training to a real time local disaster. Assessments of the status of clinic emergency plans using 15 criteria were conducted at three intervals: when the exercises were scheduled, immediately before the exercises, and for one-third of sites, three months after the exercise. All sites made improvements in their emergency plans with some or all of the plan criteria. Of the sites having follow up, most (N = 23) were community health centers that made statistically significant changes in two-thirds of the plan criteria (P = .001–.046). Following the exercises, after action reports were completed for 88 sites and noted strengths, weaknesses, and plans for improvements in their emergency plans Most sites (72–90%) showed improvements in how to activate their plans, the roles of their staff, and how to participate in a coordinated response. Challenges in scheduling exercises included time constraints and lack of resources among busy health professionals. Technical assistance and considerations of clinic schedules mitigated these issues. The multidisciplinary table top exercises proved to be an effective means to develop or improve clinic emergency plans and enhance the dialogue and coordination among health professionals before an emergency happens. PMID:20146093

  17. Hanford Site Asbestos Abatement Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mewes, B.S.

    The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less

  18. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  19. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  20. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  1. A Vision for the Future: Site-Based Strategic Planning.

    ERIC Educational Resources Information Center

    Herman, Jerry J.

    1989-01-01

    Presents a model to help principals with strategic planning. Success hinges on involving stakeholders, scanning for relevant data, identifying critical success factors, developing vision and mission statements, analyzing the site manager's supports and constraints, creating strategic goals and objectives, developing action plans, allocating…

  2. EPA Helps Two New England Communities Plan New Uses for Former Brownfield Sites

    EPA Pesticide Factsheets

    The U.S.EPA has selected the City of Providence, RI & the Eastern Maine Development Corp. to receive funding to assist with planning for cleanup & reuse of Brownfield sites as part of the Brownfields Area-Wide Planning (AWP) program.

  3. Finalizing the Libby Action Plan Research Program | Science ...

    EPA Pesticide Factsheets

    Libby, Montana is the location of a former vermiculite mine that operated from 1923 to 1990. The vermiculite ore from the mine co-existed with amphibole asbestos, referred to as Libby Amphibole Asbestos (LAA). Combined with the cessation of the asbestos mining and processing operations, there has been significant progress in reducing the exposure to LAA in Libby, Montana. In 2009, the U.S Environmental Protection Agency (EPA) jointly with the Department of Health and Human Services (DHHS) declared a public health emergency in Libby due to observed asbestos-related health effects in the region. As part of this effort, the EPA led a cross-agency research program that conducted analytical, toxicological, and epidemiological research on the health effects of asbestos at the Libby Asbestos Superfund Site (Libby Site) in Libby, Montana. The Libby Action Plan (LAP) was initiated in 2007 to support the site-specific risk assessment for the Libby Site. The goal of the LAP research program was to explore the health effects of LAA, and determine toxicity information specific to LAA in order to accurately inform a human health risk assessment at the Libby Site. LAP research informed data gaps related to the health effects of exposure to LAA, particularly related to specific mechanisms of fiber dosimetry and toxicity (e.g., inflammatory responses), as well as investigated disease progression in exposed populations and advanced asbestos analytical techniques. This work incl

  4. 76 FR 6458 - Notice of Intent to File Competing License Applications, Filing of Pre-Application Documents...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ..., Seneca Nation of Indians, P.O. Box 231, 90 Ohi:yo' Way, Salamanca, NY 14779. i. FERC Contact: Gaylord... site visit is as follows: Date: Wednesday, February 23, 2011. Time: 1:30 p.m. to 4 p.m. Location... identify preliminary information and study needs; (4) review and discuss the process plan and schedule for...

  5. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume 2.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  6. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume I.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  7. 40 CFR 60.5200 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the flow sensor and other necessary equipment in a position that provides a representative flow. (2) Use a flow sensor with a measurement sensitivity of no greater than 2 percent of the expected process... sensor(s) in a position that provides a representative measurement of the pressure (e.g., particulate...

  8. OCONUS Compliance Assessment Protocols Air Force Supplement

    DTIC Science & Technology

    2009-09-01

    that have environmental impacts (i.e., construction, mission changes, process/activity changes). Are environmental surveys and construction site...how and where does disposal occur? Has the installation conducted a complete asbestos survey ? If yes, what the date of the most recent... survey ? (Please provide a copy for the assessment team.) Has the installation prepared, coordinated, and executed an Asbestos Management Plan

  9. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  10. 23. Photographic copy of an asconstructed site plan for North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of an as-constructed site plan for North Base: Air Force Flight Test Center, Edwards Air Force Base, Edwards, California: North Base Site Plan, February 1970. This drawing shows the North Base building distribution substantially as it appears in 1995. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  11. Assessment of multiple geophysical techniques for the characterization of municipal waste deposit sites

    NASA Astrophysics Data System (ADS)

    Gaël, Dumont; Tanguy, Robert; Nicolas, Marck; Frédéric, Nguyen

    2017-10-01

    In this study, we tested the ability of geophysical methods to characterize a large technical landfill installed in a former sand quarry. The geophysical surveys specifically aimed at delimitating the deposit site horizontal extension, at estimating its thickness and at characterizing the waste material composition (the moisture content in the present case). The site delimitation was conducted with electromagnetic (in-phase and out-of-phase) and magnetic (vertical gradient and total field) methods that clearly showed the transition between the waste deposit and the host formation. Regarding waste deposit thickness evaluation, electrical resistivity tomography appeared inefficient on this particularly thick deposit site. Thus, we propose a combination of horizontal to vertical noise spectral ratio (HVNSR) and multichannel analysis of the surface waves (MASW), which successfully determined the approximate waste deposit thickness in our test landfill. However, ERT appeared to be an appropriate tool to characterize the moisture content of the waste, which is of prior information for the organic waste biodegradation process. The global multi-scale and multi-method geophysical survey offers precious information for site rehabilitation studies, water content mitigation processes for enhanced biodegradation or landfill mining operation planning.

  12. Automating an integrated spatial data-mining model for landfill site selection

    NASA Astrophysics Data System (ADS)

    Abujayyab, Sohaib K. M.; Ahamad, Mohd Sanusi S.; Yahya, Ahmad Shukri; Ahmad, Siti Zubaidah; Aziz, Hamidi Abdul

    2017-10-01

    An integrated programming environment represents a robust approach to building a valid model for landfill site selection. One of the main challenges in the integrated model is the complicated processing and modelling due to the programming stages and several limitations. An automation process helps avoid the limitations and improve the interoperability between integrated programming environments. This work targets the automation of a spatial data-mining model for landfill site selection by integrating between spatial programming environment (Python-ArcGIS) and non-spatial environment (MATLAB). The model was constructed using neural networks and is divided into nine stages distributed between Matlab and Python-ArcGIS. A case study was taken from the north part of Peninsular Malaysia. 22 criteria were selected to utilise as input data and to build the training and testing datasets. The outcomes show a high-performance accuracy percentage of 98.2% in the testing dataset using 10-fold cross validation. The automated spatial data mining model provides a solid platform for decision makers to performing landfill site selection and planning operations on a regional scale.

  13. Web-based GIS for collaborative planning and public participation: an application to the strategic planning of wind farm sites.

    PubMed

    Simão, Ana; Densham, Paul J; Haklay, Mordechai Muki

    2009-05-01

    Spatial planning typically involves multiple stakeholders. To any specific planning problem, stakeholders often bring different levels of knowledge about the components of the problem and make assumptions, reflecting their individual experiences, that yield conflicting views about desirable planning outcomes. Consequently, stakeholders need to learn about the likely outcomes that result from their stated preferences; this learning can be supported through enhanced access to information, increased public participation in spatial decision-making and support for distributed collaboration amongst planners, stakeholders and the public. This paper presents a conceptual system framework for web-based GIS that supports public participation in collaborative planning. The framework combines an information area, a Multi-Criteria Spatial Decision Support System (MC-SDSS) and an argumentation map to support distributed and asynchronous collaboration in spatial planning. After analysing the novel aspects of this framework, the paper describes its implementation, as a proof of concept, in a system for Web-based Participatory Wind Energy Planning (WePWEP). Details are provided on the specific implementation of each of WePWEP's four tiers, including technical and structural aspects. Throughout the paper, particular emphasis is placed on the need to support user learning throughout the planning process.

  14. Stakeholder engagement: a model for tobacco policy planning in Oklahoma Tribal communities.

    PubMed

    Blanchard, Jessica W; Petherick, J T; Basara, Heather

    2015-01-01

    Oklahoma law pre-empts local governments from enacting smoking restrictions inside public places that are stricter than state law, but the sovereign status of Oklahoma's 38 Tribal nations means they are uniquely positioned to stand apart as leaders in the area of tobacco policy. To provide recommendations for employing university-Tribal partnerships as an effective strategy for tobacco policy planning in tribal communities. Using a community-based participatory research approach, researchers facilitated a series of meetings with key Tribal stakeholders in order to develop a comprehensive tobacco policy plan. Ongoing engagement activities held between January 2011 and May 2012, including interdepartmental visits, facility site tours, interviews, and attendance at tribal activities, were critical for fostering constructive and trusting relationships between all partners involved in the policy planning process. The 17-month collaborative engagement produced a plan designed to regulate the use of commercial tobacco in all Tribally owned properties. The extended period of collaboration between the researchers and Tribal stakeholders facilitated: (1) levels of trust between partners; and (2) a steadfast commitment to the planning process, ensuring completion of the plan amid uncertain political climates and economic concerns about tobacco bans. Extended engagement produced an effective foundation for policy planning that promoted collaboration between otherwise dispersed Tribal departments, and facilitated communication of diverse stakeholder interests related to the goal of tobacco policies. The findings of this study provide useful strategies and best practices for those looking to employ Tribal-university partnerships as strategies for tobacco control planning and policy-based research. Copyright © 2015 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  15. Organizing a Community Advanced Pharmacy Practice Experience

    PubMed Central

    Koenigsfeld, Carrie Foust; Tice, Angela L

    2006-01-01

    Setting up a community advanced pharmacy practice experience can be an overwhelming task for many pharmacy preceptors. This article provides guidance to pharmacist preceptors in developing a complete and effective community advanced pharmacy practice experience (APPE). When preparing for the APPE, initial discussions with the college or school of pharmacy are key. Benefits, training, and requirements should be addressed. Site preparation, including staff education, will assist in the development process. The preceptor should plan orientation day activities and determine appropriate evaluation and feedback methods. With thorough preparation, the APPE will be rewarding for both the student and the pharmacy site. PMID:17136163

  16. Organizing a community advanced pharmacy practice experience.

    PubMed

    Koenigsfeld, Carrie Foust; Tice, Angela L

    2006-02-15

    Setting up a community advanced pharmacy practice experience can be an overwhelming task for many pharmacy preceptors. This article provides guidance to pharmacist preceptors in developing a complete and effective community advanced pharmacy practice experience (APPE). When preparing for the APPE, initial discussions with the college or school of pharmacy are key. Benefits, training, and requirements should be addressed. Site preparation, including staff education, will assist in the development process. The preceptor should plan orientation day activities and determine appropriate evaluation and feedback methods. With thorough preparation, the APPE will be rewarding for both the student and the pharmacy site.

  17. Water, Energy, and Biogeochemical Budgets (WEBB) program: Data availability and research at the Northern Temperate Lakes site in north-central Wisconsin

    USGS Publications Warehouse

    Elder, John F.; Krabbenhoft, David P.; Walker, John F.

    1992-01-01

    The NTL-WEBB study area includes seven lakes that are also the site of a Long-Term Ecological Research (LTER) project, sponsored by the National Science Foundation. This project incorporates diverse research investigations conducted by faculty and research associates of the University of Wisconsin-Madison. The research orientation of NTL-LTER is principally toward aquatic ecology and geochemistry of the lakes. The WEBB research plan, with its emphasis on hydrologic processes in the lake watersheds, is designed to complement and enhance the LTER work.

  18. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  19. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  20. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  1. MONROE COMMUNITY COLLEGE CAMPUS PLAN.

    ERIC Educational Resources Information Center

    Caudill, Rowlett, Scott and Associates, Bryan, TX.

    THE MASTER PLANS FOR THE CONSTRUCTION OF THE CAMPUS OF THE NEW MONROE COMMUNITY COLLEGE INCLUDE EDUCATIONAL SPECIFICATIONS, SITE ANALYSIS DATA AND BUILDING PLANS. THE EDUCATIONAL SPECIFICATIONS ARE BASED UPON COMMUNITY NEEDS AND ENROLLMENT PROJECTIONS, AND REFLECT SPACE REQUIREMENTS. IN THE SITE ANALYSIS, FACTORS SUCH AS TOPOGRAPHY, CLIMATE,…

  2. Site support program plan for ICF Kaiser Hanford Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  3. U-PLANT GEOGRAPHIC ZONE CLEANUP PROTOTYPE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ROMINE, L.D.

    2006-02-01

    The U Plant geographic zone (UPZ) occupies 0.83 square kilometers on the Hanford Site Central Plateau (200 Area). It encompasses the U Plant canyon (221-U Facility), ancillary facilities that supported the canyon, soil waste sites, and underground pipelines. The UPZ cleanup initiative coordinates the cleanup of the major facilities, ancillary facilities, waste sites, and contaminated pipelines (collectively identified as ''cleanup items'') within the geographic zone. The UPZ was selected as a geographic cleanup zone prototype for resolving regulatory, technical, and stakeholder issues and demonstrating cleanup methods for several reasons: most of the area is inactive, sufficient characterization information is availablemore » to support decisions, cleanup of the high-risk waste sites will help protect the groundwater, and the zone contains a representative cross-section of the types of cleanup actions that will be required in other geographic zones. The UPZ cleanup demonstrates the first of 22 integrated zone cleanup actions on the Hanford Site Central Plateau to address threats to groundwater, the environment, and human health. The UPZ contains more than 100 individual cleanup items. Cleanup actions in the zone will be undertaken using multiple regulatory processes and decision documents. Cleanup actions will include building demolition, waste site and pipeline excavation, and the construction of multiple, large engineered barriers. In some cases, different cleanup actions may be taken at item locations that are immediately adjacent to each other. The cleanup planning and field activities for each cleanup item must be undertaken in a coordinated and cohesive manner to ensure effective execution of the UPZ cleanup initiative. The UPZ zone cleanup implementation plan (ZCIP) was developed to address the need for a fundamental integration tool for UPZ cleanup. As UPZ cleanup planning and implementation moves forward, the ZCIP is intended to be a living document that will provide a focal point for integrating UPZ actions, including field cleanup activities, waste staging and handling, and post-cleanup monitoring and institutional controls.« less

  4. Calculations for reproducible autologous skin cell-spray grafting.

    PubMed

    Esteban-Vives, Roger; Young, Matthew T; Zhu, Toby; Beiriger, Justin; Pekor, Chris; Ziembicki, Jenny; Corcos, Alain; Rubin, Peter; Gerlach, Jörg C

    2016-12-01

    Non-cultured, autologous cell-spray grafting is an alternative to mesh grafting for larger partial- and deep partial-thickness burn wounds. The treatment uses a suspension of isolated cells, from a patient's donor site skin tissue, and cell-spray deposition onto the wound that facilitates re-epithelialization. Existing protocols for therapeutic autologous skin cell isolation and cell-spray grafting have defined the donor site area to treatment area ratio of 1:80, substantially exceeding the coverage of conventional mesh grafting. However, ratios of 1:100 are possible by maximizing the wound treatment area with harvested cells from a given donor site skin tissue according to a given burn area. Although cell isolation methods are very well described in the literature, a rational approach addressing critical aspects of these techniques are of interest in planning clinical study protocols. We considered in an experimental study the cell yield as a function of the donor site skin tissue, the cell density for spray grafting, the liquid spray volume, the sprayed distribution area, and the percentage of surface coverage. The experimental data was then used for the development of constants and mathematical equations to give a rationale for the cell isolation and cell-spray grafting processes and in planning for clinical studies. Copyright © 2016 Elsevier Ltd and ISBI. All rights reserved.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stein, Joshua; Burnham, Laurie; Jones, Christian Birk

    The U.S. DOE Regional Test Center for Solar Technologies program was established to validate photovoltaic (PV) technologies installed in a range of different climates. The program is funded by the Energy Department's SunShot Initiative. The initiative seeks to make solar energy cost competitive with other forms of electricity by the end of the decade. Sandia National Laboratory currently manages four different sites across the country. The National Renewable Energy Laboratory manages a fifth site in Colorado. The entire PV portfolio currently includes 20 industry partners and almost 500 kW of installed systems. The program follows a defined process that outlinesmore » tasks, milestones, agreements, and deliverables. The process is broken out into four main parts: 1) planning and design, 2) installation, 3) operations, and 4) decommissioning. This operations manual defines the various elements of each part.« less

  6. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  7. Stormwater Management Plan for the Arden Hills Army Training Site, Arden Hills, Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carr, Adrianne E.; Wuthrich, Kelsey K.; Ziech, Angela M.

    2013-03-01

    This stormwater management plan focuses on the cantonment and training areas of the Arden Hills Army Training Site (AHATS). The plan relates the site stormwater to the regulatory framework, and it summarizes best management practices to aide site managers in promoting clean site runoff. It includes documentation for a newly developed, detailed model of stormwater flow retention for the entire AHATS property and adjacent upgradient areas. The model relies on established modeling codes integrated in a U.S. Department of Defense-sponsored software tool, the Watershed Modeling System (WMS), and it can be updated with data on changes in land use ormore » with monitoring data.« less

  8. The ATLAS PanDA Pilot in Operation

    NASA Astrophysics Data System (ADS)

    Nilsson, P.; Caballero, J.; De, K.; Maeno, T.; Stradling, A.; Wenaus, T.; ATLAS Collaboration

    2011-12-01

    The Production and Distributed Analysis system (PanDA) [1-2] was designed to meet ATLAS [3] requirements for a data-driven workload management system capable of operating at LHC data processing scale. Submitted jobs are executed on worker nodes by pilot jobs sent to the grid sites by pilot factories. This paper provides an overview of the PanDA pilot [4] system and presents major features added in light of recent operational experience, including multi-job processing, advanced job recovery for jobs with output storage failures, gLExec [5-6] based identity switching from the generic pilot to the actual user, and other security measures. The PanDA system serves all ATLAS distributed processing and is the primary system for distributed analysis; it is currently used at over 100 sites worldwide. We analyze the performance of the pilot system in processing real LHC data on the OSG [7], EGI [8] and Nordugrid [9-10] infrastructures used by ATLAS, and describe plans for its evolution.

  9. A method for using unmanned aerial vehicles for emergency investigation of single geo-hazards and sample applications of this method

    NASA Astrophysics Data System (ADS)

    Huang, Haifeng; Long, Jingjing; Yi, Wu; Yi, Qinglin; Zhang, Guodong; Lei, Bangjun

    2017-11-01

    In recent years, unmanned aerial vehicles (UAVs) have become widely used in emergency investigations of major natural hazards over large areas; however, UAVs are less commonly employed to investigate single geo-hazards. Based on a number of successful investigations in the Three Gorges Reservoir area, China, a complete UAV-based method for performing emergency investigations of single geo-hazards is described. First, a customized UAV system that consists of a multi-rotor UAV subsystem, an aerial photography subsystem, a ground control subsystem and a ground surveillance subsystem is described in detail. The implementation process, which includes four steps, i.e., indoor preparation, site investigation, on-site fast processing and application, and indoor comprehensive processing and application, is then elaborated, and two investigation schemes, automatic and manual, that are used in the site investigation step are put forward. Moreover, some key techniques and methods - e.g., the layout and measurement of ground control points (GCPs), route planning, flight control and image collection, and the Structure from Motion (SfM) photogrammetry processing - are explained. Finally, three applications are given. Experience has shown that using UAVs for emergency investigation of single geo-hazards greatly reduces the time, intensity and risks associated with on-site work and provides valuable, high-accuracy, high-resolution information that supports emergency responses.

  10. Site Plan: A First Step.

    ERIC Educational Resources Information Center

    Gould, Bryant; Finci, David

    1986-01-01

    A campus-wide site plan looks at the campus as a whole and defines immediate and long-range problems and potential. Text and photographs illustrate site development at McClennan Community College in Waco, Texas, and at the University of Toledo and the University of Dayton, both in Ohio. (MLF)

  11. Work Plan for Comprehensive Groundwater Sampling - 2012 (Operable Unit 2), LCP Chemicals Site, Brunswick, GA

    EPA Pesticide Factsheets

    April 2012 plan to conduct a comprehensive sampling of groundwater from all wells in the site-wide monitoring well network, at the LCP Chemicals Site in Brunswick, GA. Region ID: 04 DocID: 10843427, DocDate: 04-01-2012

  12. 33. Site Plan: Custer Air Force Station, Battle Creek, Michigan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Site Plan: Custer Air Force Station, Battle Creek, Michigan, FD Radar Facilities-FPS-27, Electrical Plot Plan and Duet Details, USACOE, not date. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  13. 21. Photographic copy of a keyed site plan for North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photographic copy of a keyed site plan for North Base: Military Construction, Muroc Flight Test Base, Muroc, California; General Layout Plan, December 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  14. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  15. Health plan competition in local markets.

    PubMed Central

    Grossman, J M

    2000-01-01

    OBJECTIVE: To examine the structure of local health insurance markets and the strategies health plans were using to respond to competitive pressures in local markets in 1996/1997. DATA SOURCES/STUDY SETTING: Community Tracking Study site visits conducted between May 1996 and April 1997 in 12 U.S. markets selected to be nationally representative. STUDY DESIGN: In each site, 36 to 60 interviews on local health system change were conducted with healthcare industry informants representing health plans, providers, and purchasers. DATA COLLECTION/EXTRACTION METHOD: Relevant data for this article were abstracted from standardized protocols administered to multiple respondents in each site. PRINCIPAL FINDINGS: Although the competitive threat from national plans was pervasive, local plans in most sites continued to retain strong, often dominant, positions in historically concentrated markets. In all sites, in response to purchaser pressures for stable premiums and provider choice, and the threat of entry and to plans were using three strategies to increase market share and market power: (1) consolidation/geographic expansion, (2) price competition, and (3) product line/segment diversification that focused on broad networks and open-access products. In most markets, in response to the demand for provider choice, the trend was away from ownership and exclusive arrangements with providers. CONCLUSIONS: Although local plans were moving to become full-service regional players, there was uncertainty about the abilities of all plans to sustain growth strategies at the expense of margins and organizational stability, and to effectively manage care with broad networks. PMID:10778822

  16. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less

  17. RX for science literacy: The what, where, how, and why of health science research (A teacher`s manual about biomedical research)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, K.S.

    1994-12-31

    When the North Carolina Association for Biomedical Research (NCABR) surveyed the state`s science teachers in March 1993, 92% of those responding requested information related to biomedical research. Most of the teachers requested lesson plans and activities designed to help them give students an accurate and balanced perspective on research. In response to that need, NCABR has recently completed production of a 300-page teacher`s manual that provides an overview of the biomedical research process and describes the role and care of animals in that process. Rx for Science Literacy incorporates background information, lesson plans, handouts and activities to assist teachers inmore » K-12 classrooms. Developed by a science teacher with assistance from science and education experts, the manual captures the complex biomedical research process in an easy-to-follow, easy-to-use format. In North Carolina, NCABR plans to begin these workshops in fall 1994. The workshops will include a tour of a biomedical research laboratory and on-site presentations by bench scientists. Teacher evaluation of the manual will be structured into the workshop program. The manual is available at cost to all interested individuals and organizations.« less

  18. Airborne Hyperspectral Imaging of Seagrass and Coral Reef

    NASA Astrophysics Data System (ADS)

    Merrill, J.; Pan, Z.; Mewes, T.; Herwitz, S.

    2013-12-01

    This talk presents the process of project preparation, airborne data collection, data pre-processing and comparative analysis of a series of airborne hyperspectral projects focused on the mapping of seagrass and coral reef communities in the Florida Keys. As part of a series of large collaborative projects funded by the NASA ROSES program and the Florida Fish and Wildlife Conservation Commission and administered by the NASA UAV Collaborative, a series of airborne hyperspectral datasets were collected over six sites in the Florida Keys in May 2012, October 2012 and May 2013 by Galileo Group, Inc. using a manned Cessna 172 and NASA's SIERRA Unmanned Aerial Vehicle. Precise solar and tidal data were used to calculate airborne collection parameters and develop flight plans designed to optimize data quality. Two independent Visible and Near-Infrared (VNIR) hyperspectral imaging systems covering 400-100nm were used to collect imagery over six Areas of Interest (AOIs). Multiple collections were performed over all sites across strict solar windows in the mornings and afternoons. Independently developed pre-processing algorithms were employed to radiometrically correct, synchronize and georectify individual flight lines which were then combined into color balanced mosaics for each Area of Interest. The use of two different hyperspectral sensor as well as environmental variations between each collection allow for the comparative analysis of data quality as well as the iterative refinement of flight planning and collection parameters.

  19. Aquatic Ecosystem Enhancement at Mountaintop Mining Sites Symposium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Black, D. Courtney; Lawson, Peter; Morgan, John

    2000-01-12

    Welcome to this symposium which is part of the ongoing effort to prepare an Environmental Impact Statement (EIS) regarding mountaintop mining and valley fills. The EIS is being prepared by the U.S. Environmental Protection Agency, U.S. Army Corps of Engineers, U.S. Office of Surface Mining, and U.S. Fish and Wildlife Service, in cooperation with the State of West Virginia. Aquatic Ecosystem Enhancement (AEE) at mountaintop mining sites is one of fourteen technical areas identified for study by the EIS Interagency Steering Committee. Three goals were identified in the AEE Work Plan: 1. Assess mining and reclamation practices to show howmore » mining operations might be carried out in a way that minimizes adverse impacts to streams and other environmental resources and to local communities. Clarify economic and technical constraints and benefits. 2. Help citizens clarify choices by showing whether there are affordable ways to enhance existing mining, reclamation, mitigation processes and/or procedures. 3. Ide identify data needed to improve environmental evaluation and design of mining projects to protect the environment. Today’s symposium was proposed in the AEE Team Work Plans but coordinated planning for the event began September 15, 1999 when representatives from coal industry, environmental groups and government regulators met in Morgantown. The meeting participants worked with a facilitator from the Canaan Valley Institute to outline plans for the symposium. Several teams were formed to carry out the plans we outlined in the meeting.« less

  20. RECOVER: An Automated Cloud-Based Decision Support System for Post-fire Rehabilitation Planning

    NASA Technical Reports Server (NTRS)

    Schnase, John L.; Carroll, Mark; Weber, K. T.; Brown, Molly E.; Gill, Roger L.; Wooten, Margaret; May J.; Serr, K.; Smith, E.; Goldsby, R.; hide

    2014-01-01

    RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.

  1. RECOVER: An Automated, Cloud-Based Decision Support System for Post-Fire Rehabilitation Planning

    NASA Astrophysics Data System (ADS)

    Schnase, J. L.; Carroll, M. L.; Weber, K. T.; Brown, M. E.; Gill, R. L.; Wooten, M.; May, J.; Serr, K.; Smith, E.; Goldsby, R.; Newtoff, K.; Bradford, K.; Doyle, C.; Volker, E.; Weber, S.

    2014-11-01

    RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.

  2. Environmental Development cum Forest Plantation Planning and Management.

    ERIC Educational Resources Information Center

    Katoch, C. D.

    This textbook covers environmental conservation through forest plantation planning and management for all levels of forestry professionals and non-professionals in India and abroad. The book is divided into six parts and 29 sections in sequential order. Part I contains details on site selection, site preparations, site clearance, layout, and…

  3. Outdoor Education - A Guide to Site Planning and Implementation of Programs.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin. Div. of Curriculum Development.

    This booklet presents guidelines for initiating outdoor instructional programs. Initially, the guide lists the objectives of outdoor education: survival, recreation, development of personal health and well-being, career opportunities, and social adjustment. A discussion follows on the three phases of site planning. The first phase is site analysis…

  4. Participatory approach in planning for low carbon and eco-village: A case of Felda Taib Andak

    NASA Astrophysics Data System (ADS)

    Ngah, I.; Zulkifli, A. S.

    2014-02-01

    Participatory approaches have becoming an important tool in planning of sustainable communities. Although participation is conceived as a malleable concept there are certain methods that planners can adopt to ensure a meaningful participation. This paper will provide some experiences and lessons on how participatory planning could be carried out with local people, the role of planners in the process of plan preparation, implementation and the outcome. This paper first explores some of the meanings of participation, the criteria of participation and the approaches of participation in planning for sustainable community. The second part is a description and discussion of how participatory approach in planning was applied in planning for low carbon and eco-village in Iskandar Malaysia based on a case study of planning of Felda Taib Andak scheme. The participatory approach involved a series of meetings, site visit and focus group discussions with representative of the Felda Village to come out with action plan and actual implementation. From focus group discussions a roadmap consisted of a vision and objectives and a dozen actions were formulated and adopted. In the process of implementation the main implementation & coordination committee was form in which the author (planner) is one of its members to look into fund raising & implementation strategies together with the local people. Several task forces or sub committees responsible to implement the dozen actions were also formed. The outcome was encouraging in which some of the actions such as planting of bamboo trees, reduction of pollution from oil palm factory and bicycling activities has been implemented and shown progress. The paper also highlights some of the issues and challenges in participatory planning.

  5. Documenting pharmacist interventions on an intranet.

    PubMed

    Simonian, Armen I

    2003-01-15

    The process of developing and implementing an intranet Web site for clinical intervention documentation is described. An inpatient pharmacy department initiated an organizationwide effort to improve documentation of interventions by pharmacists at its seven hospitals to achieve real-time capture of meaningful benchmarking data. Standardization of intervention types would allow the health system to contrast and compare medication use, process improvement, and patient care initiatives among its hospitals. After completing a needs assessment and reviewing current methodologies, a computerized tracking tool was developed in-house and integrated with the organization's intranet. Representatives from all hospitals agreed on content and functionality requirements for the Web site. The site was completed and activated in February 2002. Before this Web site was established, the most documented intervention types were Renal Adjustment and Clarify Dose, with a daily average of four and three, respectively. After site activation, daily averages for Renal Adjustment remained unchanged, but Clarify Dose is now documented nine times per day. Drug Information and i.v.-to-p.o. intervention types, which previously averaged less than one intervention per day, are now documented an average of four times daily. Approximately 91% of staff pharmacists are using this site. Future plans for this site include enhanced accessibility to the site with wireless personal digital assistants. The design and implementation of an intranet Web site to document pharmacists' interventions doubled the rate of intervention documentation and standardized the intervention types among hospitals in the health system.

  6. 3D Seismic Experimentation and Advanced Processing/Inversion Development for Investigations of the Shallow Subsurface

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levander, Alan Richard; Zelt, Colin A.

    2015-03-17

    The work plan for this project was to develop and apply advanced seismic reflection and wide-angle processing and inversion techniques to high resolution seismic data for the shallow subsurface to seismically characterize the shallow subsurface at hazardous waste sites as an aid to containment and cleanup activities. We proposed to continue work on seismic data that we had already acquired under a previous DoE grant, as well as to acquire additional new datasets for analysis. The project successfully developed and/or implemented the use of 3D reflection seismology algorithms, waveform tomography and finite-frequency tomography using compressional and shear waves for highmore » resolution characterization of the shallow subsurface at two waste sites. These two sites have markedly different near-surface structures, groundwater flow patterns, and hazardous waste problems. This is documented in the list of refereed documents, conference proceedings, and Rice graduate theses, listed below.« less

  7. Utilizing the "Plan, Do, Study, Act" Framework to Explore the Process of Curricular Assessment and Redesign in a Physical Therapy Education Program in Suriname.

    PubMed

    Audette, Jennifer Gail; Baldew, Se-Sergio; Chang, Tony C M S; de Vries, Jessica; Ho A Tham, Nancy; Janssen, Johanna; Vyt, Andre

    2017-01-01

    To describe how a multinational team worked together to transition a physical therapy (PT) educational program in Paramaribo, Suriname, from a Bachelor level to a Master of Science in Physical Therapy (MSPT) level. The team was made up of PT faculty from Anton De Kom Universiteit van Suriname (AdeKUS), the Flemish Interuniversity Council University Development Cooperation (VLIR-UOS) leadership, and Health Volunteers Overseas volunteers. In this case study, the process for curricular assessment, redesign, and upgrade is described retrospectively using a Plan, Do, Study, Act (PDSA) framework. PT educational programs in developing countries are eager for upgrade to meet international expectations and to better meet community health-care needs. An ongoing process which included baseline assessment of all aspects of the existing bachelor's program in PT, development of a plan for a MSPT, implementation of the master's program, and evaluation following implementation is described. Curricular assessment and upgrade in resource-limited countries requires the implementation of process-oriented methods. The PDSA process is a useful tool to explore curricular development. The international collaboration described in this paper provides an example of the diligence, consistency, and dedication required to see a project through and achieve success while providing adequate support to the host site. This project might provide valuable insights for those involved in curricular redesign in similar settings.

  8. Development by Design in Colombia: Making Mitigation Decisions Consistent with Conservation Outcomes

    PubMed Central

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition. PMID:24339972

  9. Development by design in Colombia: making mitigation decisions consistent with conservation outcomes.

    PubMed

    Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph

    2013-01-01

    Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition.

  10. Patrick Air Force Base integrated resource assessment. Volume 1, Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandusky, W.F.; Wahlstrom, R.R.

    1994-03-01

    Some of the most difficult problems encountered at federal sites in reducing energy consumption in a cost-effective manner revolve around understanding where energy is being used and what technologies can be employed to decrease energy use. Many large federal sites have one or two meters to track electric energy use for several thousand buildings and numerous industrial processes. Even where meters are available on individual buildings or family housing units, the meters are not consistently read. When the federal energy manager has been able to identify high energy users, the energy manager may not have the background, training, or resourcesmore » to determine the most cost-effective options for reducing this energy use. This limitation can lead to selection of suboptimal projects that prevent the site from achieving full life-cycle cost savings. The USDOE Federal Energy Management Program has been tasked by the US Air Force Space Command to identify, evaluate, and acquire all cost-effective energy projects at selected federal facilities. This is part of a model program developed to provide a systematic approach to evaluating energy opportunities. The program (1) identifies the building groups and end uses using the most energy (not just having the greatest energy-use intensity) and (2) evaluates the numerous options for retrofit or installation of new technology that will result in the selection of the most cost-effective technologies. This model program provides the federal energy manager with a road map to significantly reduce energy use in a planned, rational, cost-effective fashion that is not biased by the constraints of the typical funding sources available to federal sites. The results from this assessment process can easily be turned into a 5- to 10-year energy management plan.« less

  11. 13. Photographic copy of site plan displaying Test Stand 'C' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of site plan displaying Test Stand 'C' (4217/E-18), Test Stand 'D' (4223/E-24), and Control and Recording Center (4221/E-22) with ancillary structures, and connecting roads and services. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office 'Repairs to Test Stand 'C,' Edwards Test Station, Legend & Site Plan M-1,' drawing no. ESP/115, August 14, 1987. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA

  12. 27. "SITE PLAN." Specifications No. OC15775, Drawing No. AF600915, sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. "SITE PLAN." Specifications No. OC1-57-75, Drawing No. AF-60-09-15, sheet 1 of 96, D.O. Series No. AF 1394/20, Rev. B. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. B, Date: 11/17/59. Site plan of 20,000-foot track, including construction phasing notes. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  13. Off-site Emergency Planning at UK Nuclear Licensed Sites.

    PubMed

    Leonard, Paul; Thomas, Gareth

    2017-04-01

    Nuclear emergency planning arrangements in the UK are continually kept under review. This work proposes to outline how experience from nuclear exercises and undertaking emergency response duties can be based on radiological knowledge of specific sites and utilised in the future. In 2014, the UK regulator, the Office for Nuclear Regulation (ONR) revised their principles for the determination of off-site emergency planning areas around nuclear sites where predetermined countermeasures and other protection measures are applied to protect those people who may be affected by a radiation emergency. The revised principles also enhanced communication from the nuclear site operators and local authorities to the public. This updated ONR's application of the UK Radiation (Emergency Preparedness and Public Information) Regulations 2001 (REPPIR) http://www.hse.gov.uk/radiation/ionising/reppir.htm, which includes details of minimising potential doses to the public, as well as assessment and reassurance, linked to other concurrent risks such as flooding. ONR undertakes site-specific assessments of each operators' hazard identification and risk evaluation, which include consideration of whether the public might receive a significant radiation dose in the year following the emergency (excluding countermeasures in the first 24 hours). In defining the areas for off-site emergency planning, practical and strategic factors are then considered, which include other local non-nuclear emergency planning arrangements and experience, and whether local geographic and demographic aspects could aid public credibility and confidence. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deshmukh, Ranjit; Wu, Grace

    The MapRE (Multi-criteria Analysis for Planning Renewable Energy) GIS (Geographic Information Systems) Tools are a set of ArcGIS tools to a) conduct site suitability analysis for wind and solar resources using inclusion and exclusion criteria, and create resource maps, b) create project opportunity areas and compute various attributes such as cost, distances to existing and planned infrastructure. and environmental impact factors; and c) calculate and update various attributes for already processed renewable energy zones. In addition, MapRE data sets are geospatial data of renewable energy project opportunity areas and zones with pre-calculated attributes for several countries. These tools and datamore » are available at mapre.lbl.gov.« less

  15. The need for artificial intelligence as an aid in controlling a manufacturing operation

    NASA Astrophysics Data System (ADS)

    Weyand, J.

    AI applications to industrial production and planning are discussed and illustrated with diagrams and drawings. Applications examined include flexible automation of manufacturing processes (robots with open manual control, robots programmable to meet product specifications, self-regulated robots, and robots capable of learning), flexible fault detection and diagnostics, production control, and overall planning and management (product strategies, marketing, determination of development capacity, site selection, project organization, and technology investment strategies). For the case of robots, problems in the design and operation of a state-of-the-art machine-tool cell (for hole boring, milling, and joining) are analyzed in detail.

  16. 30 CFR 285.605 - What is a Site Assessment Plan (SAP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Site Assessment Plan (SAP)? 285.605... Assessment Plan (SAP)? (a) A SAP describes the activities (e.g., installation of meteorological towers... project easement, or to test technology devices. (1) Your SAP must describe how you will conduct your...

  17. How Does a Multi-Site Institution Plan Effectively?

    ERIC Educational Resources Information Center

    Jefferson, Curtis F.

    A multi-site college plans effectively by having in place planning and evaluation systems that enhance its capability to respond effectively to changes in the environment in order to continue to provide high quality educational programs and services for the people in its service area. The effectiveness of these systems is dependent on clearly…

  18. Vision into Reality: Planning and Budgeting Processes Implemented at NMSU-Carlsbad through the Year 2000.

    ERIC Educational Resources Information Center

    Cowen, Sonia S.

    Prepared for a site visit by the North Central Association (NCA), this report describes the goals and vision of New Mexico State University's two-year branch campus at Carlsbad (NMSU-C) through the year 2000. The first section states the mission, goals, and purposes of NMSU-C, while the second describes six campus-wide initiatives to be completed…

  19. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work;more » therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.« less

  20. "You can save time if…"-A qualitative study on internal factors slowing down clinical trials in Sub-Saharan Africa.

    PubMed

    Vischer, Nerina; Pfeiffer, Constanze; Limacher, Manuela; Burri, Christian

    2017-01-01

    The costs, complexity, legal requirements and number of amendments associated with clinical trials are rising constantly, which negatively affects the efficient conduct of trials. In Sub-Saharan Africa, this situation is exacerbated by capacity and funding limitations, which further increase the workload of clinical trialists. At the same time, trials are critically important for improving public health in these settings. The aim of this study was to identify the internal factors that slow down clinical trials in Sub-Saharan Africa. Here, factors are limited to those that exclusively relate to clinical trial teams and sponsors. These factors may be influenced independently of external conditions and may significantly increase trial efficiency if addressed by the respective teams. We conducted sixty key informant interviews with clinical trial staff working in different positions in two clinical research centres in Kenya, Ghana, Burkina Faso and Senegal. The study covered English- and French-speaking, and Eastern and Western parts of Sub-Saharan Africa. We performed thematic analysis of the interview transcripts. We found various internal factors associated with slowing down clinical trials; these were summarised into two broad themes, "planning" and "site organisation". These themes were consistently mentioned across positions and countries. "Planning" factors related to budget feasibility, clear project ideas, realistic deadlines, understanding of trial processes, adaptation to the local context and involvement of site staff in planning. "Site organisation" factors covered staff turnover, employment conditions, career paths, workload, delegation and management. We found that internal factors slowing down clinical trials are of high importance to trial staff. Our data suggest that adequate and coherent planning, careful assessment of the setting, clear task allocation and management capacity strengthening may help to overcome the identified internal factors and allow clinical trials to proceed more efficiently.

  1. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less

  2. Application of remote sensors in coastal zone observations

    NASA Technical Reports Server (NTRS)

    Caillat, J. M.; Elachi, C.; Brown, W. E., Jr.

    1975-01-01

    A review of processes taking place along coastlines and their biological consideration led to the determination of the elements which are required in the study of coastal structures and which are needed for better utilization of the resources from the oceans. The processes considered include waves, currents, and their influence on the erosion of coastal structures. Biological considerations include coastal fisheries, estuaries, and tidal marshes. Various remote sensors were analyzed for the information which they can provide and sites were proposed where a general ocean-observation plan could be tested.

  3. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  4. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  5. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  6. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  7. Optimization of site layout for change of plant operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reuwer, S.M.; Kasperski, E.; Joseph, T.D.

    1995-12-31

    Several of the Florida Power & Light operating fossil power plants have undergone significant site layout changes as well as changes in plant operation. The FPL Fort Lauderdale Plant was repowered in 1992 which consisted of using four (4) Westinghouse 501F Combustion Turbines rated at 158 Mw each, to repower two (2) existing steam turbines rates at 143 Mw each. In 1991, a physical security fence separation occurred between Turkey Point Plants`s fossil fueled Units 1&2, and its nuclear fueled Units 3&4. As a result of this separation, certain facilities common to both the nuclear side and fossil side ofmore » the plant required relocating. Also, the Sanford and Manatee Plants were evaluated for the use of a new fuel as an alternative source. Manatee Plant is currently in the licensing process for modifications to burn a new fuel, requiring expansion of backened clean-up equipment, with additional staff to operate this equipment. In order to address these plant changes, site development studies were prepared for each plant to determine the suitability of the existing ancillary facilities to support the operational changes, and to make recommendations for facility improvement if found inadequate. A standardized process was developed for all of the site studies. This proved to be a comprehensive process and approach, that gave FPL a successful result that all the various stake holders bought into. This process was objectively based, focused, and got us to where we need to be as quickly as possible. As a result, this paper details the outline and various methods developed to prepare a study following this process, that will ultimately provide the optimum site development plan for the changing plant operations.« less

  8. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  9. Wilderness and backcountry site restoration guide

    Treesearch

    Lisa Therrell; David Cole; Victor Claassen; Chris Ryan; Mary Ann Davies

    2006-01-01

    This comprehensive guide focuses on restoration of small-scale impact caused by human actions in wilderness and backcountry areas. The guide's goals are to: 1) Help practitioners develop plans that thoroughly address the question of whether site restoration is the best management action and, if so, develop a site-specific restoration plan that incorporates...

  10. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  11. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 6 Domestic Security 1 2011-01-01 2011-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  12. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  13. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  14. Essential Components of a Perimeter Air Monitoring Plan and Worker Protection Program at Sites Involving the Excavation of Naturally Occurring Asbestos (NOA) in California

    NASA Astrophysics Data System (ADS)

    Zdeb, T. F.

    2012-12-01

    Preparing a Perimeter Air Monitoring Plan that provides the essential information and methods of evaluation needed to assure that the health of the surrounding community is adequately protected and adapting currently existing Cal/OSHA regulations to be relevant to the protection of workers at sites involving the excavation of Naturally Occurring Asbestos (NOA) is oftentimes challenging in California. Current guidelines regarding what constitutes an effective air monitoring program are often lacking in details regarding what should be sampled and analyzed to characterize a site and what evaluation techniques should be applied to process the results of monitoring, and the current Cal/OSHA asbestos related regulations regarding worker protection are for the most part largely pertinent to the abatement of asbestos in buildings. An overview of the essential components of an effective Baseline and Perimeter Air Monitoring Plan will be presented that includes a brief discussion of the various asbestos types and fiber sizes that may need to be considered, possible approachs for evaluating temporal and spatial variability, review of selected site boundary target concentrations, and consideration of the potential for airborne dust and soil containing asbestos (and other contaminants) to migrate and accumulate offsite eventually contributing to "background creep" --the incremental increase of overall airborne asbestos concentrations in the areas surrounding the site due to the re-entrainment of asbestos from the settled dust and/or transported soil. In addition to the above, the current Cal/OSHA asbestos regulations related to worker protection will be briefly discussed with respect to their relevancy at NOA sites with an overview of the adaptations to the regulations that were developed as a result of some fairly lengthy discussions with representatives of Cal/OSHA. These adaptations include, among other things, defining how regulated areas (asbestos concentrations over 1%) and "provisionally regulated" areas (less than 1%) are established and treated, what variables need to be considered when attempting to complete a personal exposure assessment, Cal/OSHA Permissible Exposure Limits (PELs) versus site specific permissible exposure limits, allowable work practices, and the qualifications of personnel performing the sampling and analyses of data.

  15. Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning and Implementation

    NASA Astrophysics Data System (ADS)

    Arvidson, R.

    1999-01-01

    The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG), a subgroup of the Project Science Group, has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this abstract we cover one element of the SOWG planning activities, the development of a set of six science campaign themes that maximize the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site, together with quantitative information on material mineralogy, chemistry, and physical properties (rock textures; soil grain size and shape distributions; degree and nature of soil induration; soil magnetic properties). Observations from the APEX, MECA, and MIP Experiments, including use of the robotic arm robotic arm camera (RAC) and the Marie Curie rover, will be used to address these parameters in a synergistic way. Further, calibration targets on APEX will provide radiometric and mineralogical control surfaces, and magnet targets will allow observations of magnetic phases. Patch plates on MECA will be imaged to determine adhesive and abrasive properties of soils. Coordinated mission planning is crucial for optimizing the measurement synergy among the packages included on the lander. This planning has already begun through generation of multi-sol detailed operations activities.

  16. Choosing indicators of natural resource condition: A case study in Arches National Park, Utah, USA

    USGS Publications Warehouse

    Belnap, J.

    1998-01-01

    Heavy visitor use in many areas of the world have necessitated development of ways to assess visitation impacts. Arches National Park recently completed a Visitor Experience and Resource Protection (VERP) plan. Integral to this plan was developing a method to identify biological indicators that would both measure visitor impacts and response to management actions. The process used in Arches for indicator selection is outlined here as a model applicable to many areas facing similar challenges. The steps were: (1) Vegetation types most used by visitors were identified. Impacted and unimpacted areas in these types were sampled, comparing vegetation and soil factors. (2) Variables found to differ significantly between compared sites were used as potential indicators. (3) Site-specific criteria for indicators were developed, and potential indicators evaluated using these criteria. (4) Chosen indicators were further researched for ecological relevancy. (5) Final indicators were chosen, field tested, and monitoring sites designated. In Arches, indicators were chosen for monitoring annually (soil crust index, soil compaction, number of used social trails and soil aggregate stability) and every five years (vegetation cover and frequency; ground cover; soil chemistry; and plant tissue chemistry).

  17. Harvard Community Health Plan's Mental Health Redesign Project: a managerial and clinical partnership.

    PubMed

    Abrams, H S

    1993-01-01

    Harvard Community Health Plan, founded in 1969 as a staff model HMO, is currently a staff and group model HMO with 521,000 members, 19 health centers and 12 independently owned group practices with 26 locations. In 1987, the Plan initiated a review of its mental health benefit and program because its costs were rising, member and clinician dissatisfaction was increasing and many believed the problem was the nature and scope of the benefit. After two years of study, surveys, interviews, cost and utilization analysis, the Plan identified its professional staff as its key asset but recognized many problem areas, including problems with access, variation from site to site, inconsistent service delivery, lack of consistent utilization management and the need for greater diversity along the spectrum of care available to members. From 1989 to 1990, more than 200 clinicians and support staff were engaged in the process of developing a variety of components to the "mental health redesign program." Three simultaneous efforts included developing a method of categorizing patients, restructuring the delivery system and redesigning the benefit. A Mental Health Patient Assessment Tool was created which assists clinicians in performing comprehensive evaluations, administers the benefit, measures progress and supports outcomes research. Delivery system changes included the implementation of self-referral, access standards, intake triage functions by non-clinical staff, program development and an outpatient utilization management function.

  18. WE-H-BRC-04: Implement Lean Methodology to Make Our Current Process of CT Simulation to Treatment More Efficient

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boddu, S; Morrow, A; Krishnamurthy, N

    Purpose: Our goal is to implement lean methodology to make our current process of CT simulation to treatment more efficient. Methods: In this study, we implemented lean methodology and tools and employed flowchart in excel for process-mapping. We formed a group of physicians, physicists, dosimetrists, therapists and a clinical physics assistant and huddled bi-weekly to map current value streams. We performed GEMBA walks and observed current processes from scheduling patient CT Simulations to treatment plan approval. From this, the entire workflow was categorized into processes, sub-processes, and tasks. For each process we gathered data on touch time, first time quality,more » undesirable effects (UDEs), and wait-times from relevant members of each task. UDEs were binned per frequency of their occurrence. We huddled to map future state and to find solutions to high frequency UDEs. We implemented visual controls, hard stops, and documented issues found during chart checks prior to treatment plan approval. Results: We have identified approximately 64 UDEs in our current workflow that could cause delays, re-work, compromise the quality and safety of patient treatments, or cause wait times between 1 – 6 days. While some UDEs are unavoidable, such as re-planning due to patient weight loss, eliminating avoidable UDEs is our goal. In 2015, we found 399 issues with patient treatment plans, of which 261, 95 and 43 were low, medium and high severity, respectively. We also mapped patient-specific QA processes for IMRT/Rapid Arc and SRS/SBRT, involving 10 and 18 steps, respectively. From these, 13 UDEs were found and 5 were addressed that solved 20% of issues. Conclusion: We have successfully implemented lean methodology and tools. We are further mapping treatment site specific workflows to identify bottlenecks, potential breakdowns and personnel allocation and employ tools like failure mode effects analysis to mitigate risk factors to make this process efficient.« less

  19. 14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1120. Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1-120. Specifications No. OC2-55-72; Drawing No. 60-09-12; sheet 7 of 148; file no. 1320/58, Rev. C. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338 Rev. C, Date: 16 April 1957. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  20. China SLAT Plan Template

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dietrich, Richard E.

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

Top