Sample records for site study plan

  1. Energy conserving site design case study: Shenandoah, Georgia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The case study examines the means by which energy conservation can be achieved at an aggregate community level by using proper planning and analytical techniques for a new town, Shenandoah, Georgia, located twenty-five miles southwest of Atlanta's Hartsfield International Airport. A potentially implementable energy conservation community plan is achieved by a study team examining the land use options, siting characteristics of each building type, alternate infrastructure plans, possible decentralized energy options, and central utility schemes to determine how community energy conservation can be achieved by use of pre-construction planning. The concept for the development of mixed land uses as amore » passively sited, energy conserving community is based on a plan (Level 1 Plan) that uses the natural site characteristics, maximizes on passive energy siting requirement, and allows flexibility for the changing needs of the developers. The Level 2 Plan is identical with Level 1 plan plus a series of decentraized systems that have been added to the residential units: the single-family detached, the apartments, and the townhouses. Level 3 Plan is similar to the Level 1 Plan except that higher density dwellings have been moved to areas adjacent to central site. The total energy savings for each plan relative to the conventional plan are indicated. (MCW)« less

  2. SUPERFUND TREATABILITY CLEARINGHOUSE: SOIL STABILIZATION PILOT STUDY, UNITED CHROME NPL SITE PILOT STUDY AND HEALTH AND SAFETY PROGRAM, UNITED CHROME NPL SITE PILOT STUDY

    EPA Science Inventory

    This document is a project plan for a pilot study at the United Chrome NPL site, Corvallis, Oregon and includes the health and safety and quality assurance/quality control plans. The plan reports results of a bench-scale study of the treatment process as iieasured by the ...

  3. Frederick Law Olmsted National Historic Site : transportation study

    DOT National Transportation Integrated Search

    2011-02-01

    This study provide concepts and ideas for a complementary transportation plan in support of the revised General Management Plan (GMP) for the Frederick Law Olmsted National Historic Site. The GMP sets forth a preferred plan of action for how Olmsted ...

  4. A needs analysis method for land-use planning of illegal dumping sites: a case study in Aomori-Iwate, Japan.

    PubMed

    Ishii, Kazuei; Furuichi, Toru; Nagao, Yukari

    2013-02-01

    Land use at contaminated sites, following remediation, is often needed for regional redevelopment. However, there exist few methods of developing economically and socially feasible land-use plans based on regional needs because of the wide variety of land-use requirements. This study proposes a new needs analysis method for the conceptual land-use planning of contaminated sites and illustrates this method with a case study of an illegal dumping site for hazardous waste. In this method, planning factors consisting of the land-use attributes and related facilities are extracted from the potential needs of the residents through a preliminary questionnaire. Using the extracted attributes of land use and the related facilities, land-use cases are designed for selection-based conjoint analysis. A second questionnaire for respondents to the first one who indicated an interest in participating in the second questionnaire is conducted for the conjoint analysis to determine the utility function and marginal cost of each attribute in order to prioritize the planning factors to develop a quantitative and economically and socially feasible land-use plan. Based on the results, site-specific land-use alternatives are developed and evaluated by the utility function obtained from the conjoint analysis. In this case study of an illegal dumping site for hazardous waste, the uses preferred as part of a conceptual land-use plan following remediation of the site were (1) agricultural land and a biogas plant designed to recover energy from biomass or (2) a park with a welfare facility and an athletic field. Our needs analysis method with conjoint analysis is applicable to the development of conceptual land-use planning for similar sites following remediation, particularly when added value is considered. Copyright © 2012 Elsevier Ltd. All rights reserved.

  5. Health plan competition in local markets.

    PubMed Central

    Grossman, J M

    2000-01-01

    OBJECTIVE: To examine the structure of local health insurance markets and the strategies health plans were using to respond to competitive pressures in local markets in 1996/1997. DATA SOURCES/STUDY SETTING: Community Tracking Study site visits conducted between May 1996 and April 1997 in 12 U.S. markets selected to be nationally representative. STUDY DESIGN: In each site, 36 to 60 interviews on local health system change were conducted with healthcare industry informants representing health plans, providers, and purchasers. DATA COLLECTION/EXTRACTION METHOD: Relevant data for this article were abstracted from standardized protocols administered to multiple respondents in each site. PRINCIPAL FINDINGS: Although the competitive threat from national plans was pervasive, local plans in most sites continued to retain strong, often dominant, positions in historically concentrated markets. In all sites, in response to purchaser pressures for stable premiums and provider choice, and the threat of entry and to plans were using three strategies to increase market share and market power: (1) consolidation/geographic expansion, (2) price competition, and (3) product line/segment diversification that focused on broad networks and open-access products. In most markets, in response to the demand for provider choice, the trend was away from ownership and exclusive arrangements with providers. CONCLUSIONS: Although local plans were moving to become full-service regional players, there was uncertainty about the abilities of all plans to sustain growth strategies at the expense of margins and organizational stability, and to effectively manage care with broad networks. PMID:10778822

  6. Model Development and Process Analysis for Lean Cellular Design Planning in Aerospace Assembly and Manufacturing

    NASA Astrophysics Data System (ADS)

    Hilburn, Monty D.

    Successful lean manufacturing and cellular manufacturing execution relies upon a foundation of leadership commitment and strategic planning built upon solid data and robust analysis. The problem for this study was to create and employ a simple lean transformation planning model and review process that could be used to identify functional support staff resources required to plan and execute lean manufacturing cells within aerospace assembly and manufacturing sites. The lean planning model was developed using available literature for lean manufacturing kaizen best practices and validated through a Delphi panel of lean experts. The resulting model and a standardized review process were used to assess the state of lean transformation planning at five sites of an international aerospace manufacturing and assembly company. The results of the three day, on-site review were compared with baseline plans collected from each of the five sites to determine if there analyzed, with focus on three critical areas of lean planning: the number and type of manufacturing cells identified, the number, type, and duration of planned lean and continuous kaizen events, and the quantity and type of functional staffing resources planned to support the kaizen schedule. Summarized data of the baseline and on-site reviews was analyzed with descriptive statistics. ANOVAs and paired-t tests at 95% significance level were conducted on the means of data sets to determine if null hypotheses related to cell, kaizen event, and support resources could be rejected. The results of the research found significant differences between lean transformation plans developed by site leadership and plans developed utilizing the structured, on-site review process and lean transformation planning model. The null hypothesis that there was no difference between the means of pre-review and on-site cell counts was rejected, as was the null hypothesis that there was no significant difference in kaizen event plans. These factors are critical inputs into the support staffing resources calculation used by the lean planning model. Null hypothesis related to functional support staff resources was rejected for most functional groups, indicating that the baseline site plan inadequately provided for cross-functional staff involvement to support the lean transformation plan. Null hypotheses related to total lean transformation staffing could not be rejected, indicating that while total staffing plans were not significantly different than plans developed during the on-site review and through the use of the lean planning model, the allocation of staffing among various functional groups such as engineering, production, and materials planning was an issue. The on-site review process and simple lean transformation plan developed was determined to be useful in identifying short-comings in lean transformation planning within aerospace manufacturing and assembly sites. It was concluded that the differences uncovered were likely contributing factors affecting the effectiveness of aerospace manufacturing sites' implementation of lean cellular manufacturing.

  7. Development of policies for Natura 2000 sites: a multi-criteria approach to support decision makers.

    PubMed

    Cortina, Carla; Boggia, Antonio

    2014-08-01

    The aim of this study is to present a methodology to support decision makers in the choice of Natura 2000 sites needing an appropriate management plan to ensure a sustainable socio-economic development. In order to promote sustainable development in the Natura 2000 sites compatible with nature preservation, conservation measures or management plans are necessary. The main issue is to decide when only conservation measures can be applied and when the sites need an appropriate management plan. We present a case study for the Italian Region of Umbria. The methodology is based on a multi-criteria approach to identify the biodiversity index (BI), and on the development of a human activities index (HAI). By crossing the two indexes for each site on a Cartesian plane, four groups of sites were identified. Each group corresponds to a specific need for an appropriate management plan. Sites in the first group with a high level both of biodiversity and human activities have the most urgent need of an appropriate management plan to ensure sustainable development. The proposed methodology and analysis is replicable in other regions or countries by using the data available for each site in the Natura 2000 standard data form. A multi-criteria analysis is especially suitable for supporting decision makers when they deal with a multidimensional decision process. We found the multi-criteria approach particularly sound in this case, due to the concept of biodiversity itself, which is complex and multidimensional, and to the high number of alternatives (Natura 2000 sites) to be assessed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  8. statement of significance, location map, site plan, landscape plan, site ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    statement of significance, location map, site plan, landscape plan, site sections, evolution of cemetery landscape. - San Francisco National Cemetery, 1 Lincoln Boulevard, San Francisco, San Francisco County, CA

  9. Accidental Release of Chlorine from a Storage Facility and an On-Site Emergency Mock Drill: A Case Study

    PubMed Central

    Soman, Ambalathumpara Raman; Sundararaj, Gopalswamy

    2015-01-01

    In the current industrial scenario there is a serious need for formulating strategies to handle hazardous substances in the safest way. Manufacture, storage, and use of hazardous substances pose a serious risk to industry, people, and the environment. Accidental release of toxic chemicals can lead to emergencies. An emergency response plan (ERP) is inevitable to minimize the adverse effects of such releases. The on-site emergency plan is an integral component of any process safety and risk management system. This paper deals with an on-site emergency response plan for a chlorine manufacturing industry. It was developed on the basis of a previous study on chlorine release and a full scale mock drill has been conducted for testing the plan. Results indicated that properly trained personnel can effectively handle each level of incidents occurring in the process plant. As an extensive guideline to the district level government authorities for off-site emergency planning, risk zone has also been estimated with reference to a chlorine exposure threshold of 3 ppm. PMID:26171416

  10. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  11. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  12. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  13. 41 CFR 102-76.20 - What issues must Federal agencies consider in providing site planning and landscape design services?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... agencies consider in providing site planning and landscape design services? 102-76.20 Section 102-76.20... What issues must Federal agencies consider in providing site planning and landscape design services? In providing site planning and design services, Federal agencies must— (a) Make the site planning and landscape...

  14. Employer health care plan design and its effect on plan costs.

    PubMed

    Custer, W S

    1991-01-01

    This study uses claims data from employers in the Houston Area Health Care Coalition (HAHCC) for 1985 through the first half of 1987 to examine the effect of health care plan attributes on health care costs. Plan attributes affect the site of care and the costs of care. Utilization review clearly was effective in reducing the demand for inpatient services, but that reduction was in large measure matched by increases in care in the outpatient setting. Restrictions on mental health benefits also shifted the site of care. In contrast, neither premium sharing nor the plan's deductible had a significant impact on total plan charges. The study results demonstrate the need to have a comprehensive cost management strategy.

  15. Site selection and traverse planning to support a lunar polar rover mission: A case study at Haworth Crater

    NASA Astrophysics Data System (ADS)

    Heldmann, Jennifer L.; Colaprete, Anthony; Elphic, Richard C.; Bussey, Ben; McGovern, Andrew; Beyer, Ross; Lees, David; Deans, Matt

    2016-10-01

    Studies of lunar polar volatile deposits are of interest for scientific purposes to understand the nature and evolution of the volatiles, and also for exploration reasons as a possible in situ resource to enable long term human exploration and settlement of the Moon. Both theoretical and observational studies have suggested that significant quantities of volatiles exist in the polar regions, although the lateral and horizontal distribution remains unknown at the km scale and finer resolution. A lunar polar rover mission is required to further characterize the distribution, quantity, and character of lunar polar volatile deposits at these higher spatial resolutions. Here we present a case study for NASA's Resource Prospector (RP) mission concept for a lunar polar rover and utilize this mission architecture and associated constraints to evaluate whether a suitable landing site exists to support an RP flight mission. We evaluate the landing site criteria to characterize the Haworth Crater region in terms of expected hydrogen abundance, surface topography, and prevalence of shadowed regions, as well as solar illumination and direct to Earth communications as a function of time to develop a notional rover traverse plan that addresses both science and engineering requirements. We also present lessons-learned regarding lunar traverse path planning focusing on the critical nature of landing site selection, the influence of illumination patterns on traverse planning, the effects of performing shadowed rover operations, the influence of communications coverage on traverse plan development, and strategic planning to maximize rover lifetime and science at end of mission. Here we present a detailed traverse path scenario for a lunar polar volatiles rover mission and find that the particular site north of Haworth Crater studied here is suitable for further characterization of polar volatile deposits.

  16. Cultural Resources Reconnaissance Along the Cheyenne River Arm of Lake Oahe in Dewey, Haakon, Stanley, and Ziebach Counties, South Dakota. Volume 1. Main Report

    DTIC Science & Technology

    1988-03-01

    of site 39ST282................................227 39 Plan of site 39ST283................................230 40 Detailed plans of Features 1 and 2...268 53 Plan of site 39DW64 .............................. 272 54 Plan of Feature 1, site 39DW64 ................... 273 55 Plan of site 39DW65...facing E ........................... 228 46 Site 39ST283, facing NE .......................... 232 47 Detail of Feature 1, site 39ST283, facing NW

  17. Riparian buffer design guidelines for water quality and wildlife habitat functions on agricultural landscapes in the Intermountain West: Case Study

    Treesearch

    Craig W. Johnson; Susan Buffler

    2008-01-01

    This hypothetical case study illustrates how the riparian buffer planning protocol described in the RB handbook is used to plan a buffer for both water quality and wildlife conservation on a specific project site. The case study site includes riparian buffer characteristics typical of the study area-variable topography and soils, flood plain wetlands, seeps, springs,...

  18. Innovations in Site Characterization Case Study: The Role of a Conceptual Site Model for Expedited Site Characterization Using the Triad Approach at the Poudre River Site, Fort Collins, Colorado

    EPA Pesticide Factsheets

    This case study examines how systematic planning, an evolving conceptual site model (CSM), dynamic work strategies, and real time measurement technologies can be used to unravel complex contaminant distribution patterns...

  19. Health plan competition in local markets.

    PubMed

    Grossman, J M

    2000-04-01

    To examine the structure of local health insurance markets and the strategies health plans were using to respond to competitive pressures in local markets in 1996/1997. Community Tracking Study site visits conducted between May 1996 and April 1997 in 12 U.S. markets selected to be nationally representative. In each site, 36 to 60 interviews on local health system change were conducted with healthcare industry informants representing health plans, providers, and purchasers. Relevant data for this article were abstracted from standardized protocols administered to multiple respondents in each site. Although the competitive threat from national plans was pervasive, local plans in most sites continued to retain strong, often dominant, positions in historically concentrated markets. In all sites, in response to purchaser pressures for stable premiums and provider choice, and the threat of entry and to plans were using three strategies to increase market share and market power: (1) consolidation/geographic expansion, (2) price competition, and (3) product line/segment diversification that focused on broad networks and open-access products. In most markets, in response to the demand for provider choice, the trend was away from ownership and exclusive arrangements with providers. Although local plans were moving to become full-service regional players, there was uncertainty about the abilities of all plans to sustain growth strategies at the expense of margins and organizational stability, and to effectively manage care with broad networks.

  20. Sustainable Impact of Landfill Siting towards Urban Planning in Malaysia

    NASA Astrophysics Data System (ADS)

    Sin Tey, Jia; Goh, Kai Chen; Ern Ang, Peniel Soon

    2017-10-01

    Landfill is one of the most common, widely used waste management technique in Malaysia. The ever increasing of solid waste has made the role of landfill become prominent despite the negative impacts that caused by the landfill is unavoidable. The public and government regulations are getting more aware with the negative impacts that could be brought by the landfill towards the community. It led to the cultural shift to integrate the concept of sustainability into the planning of siting a landfill in an urban area. However, current urban planning tends to emphasize more on the environmental aspect instead of social and economic aspects. This is due to the existing planning guidelines and stakeholder’s understandings are more on the environmental aspect. This led to the needs of incorporating the concept of sustainability into the urban planning. Thus, this paper focuses on the industry stakeholders view on the negative impacts that will cause by the landfill towards the urban planning. The industry stakeholders are those who are related to the decision-making in the selection of a landfill site in the government department. The scope of the study is within the country of Malaysia. This study was conducted through the semi-structured interviews with a total of fifteen industry stakeholders to obtain their perspective on the issues of impacts of siting a landfill in the urban area. The data obtained was analysed using the software, QSR NVivo version 10. Results indicate that landfill bought significant sustainability-related impacts towards landfill siting in urban planning. The negative impacts stated by the respondents are categorized under all three sustainable aspects such as environmental, social and economic. Among the results are such as the pollution, such as the generation of leachate, the objection in siting a landfill site against by the public, and the negotiating and getting money contribution from local authorities. The results produced can be served as a guideline for the industry stakeholders to have a holistic overview of the impacts that could lead by the landfill in siting into the urban area in terms of sustainability aspects. Moreover, it serves as a platform for the developing a holistic guideline for urban planning in the consideration of sustainability aspect of the selection for a landfill site.

  1. Ecological Restoration: Bringing Back the Prairie.

    ERIC Educational Resources Information Center

    Murray, Molly Fifield

    1997-01-01

    Defines ecological restoration and offers a plan for prairie restoration as a schoolyard project. Steps include researching and planning the site, preparation and planting, and continuing management of the site. Ecological concepts in this activity also relate to science, language arts, math, social studies, art, and music for K-12 students. (AIM)

  2. Ants as a measure of effectiveness of habitat conservation planning in southern California

    USGS Publications Warehouse

    Mitrovich, Milan J.; Matsuda, Tritia; Pease, Krista H.; Fisher, Robert N.

    2010-01-01

    In the United States multispecies habitat conservation plans were meant to be the solution to conflicts between economic development and protection of biological diversity. Although now widely applied, questions exist concerning the scientific credibility of the conservation planning process and effectiveness of the plans. We used ants to assess performance of one of the first regional conservation plans developed in the United States, the Orange County Central-Coastal Natural Community Conservation Plan (NCCP), in meeting its broader conservation objectives of biodiversity and ecosystem-level protection. We collected pitfall data on ants for over 3 years on 172 sites established across a network of conservation lands in coastal southern California. Although recovered native ant diversity for the study area was high, site-occupancy models indicated the invasive and ecologically disruptive Argentine ant ( Linepithema humile) was present at 29% of sites, and sites located within 200 m of urban and agricultural areas were more likely to have been invaded. Within invaded sites, native ants were largely displaced, and their median species richness declined by more than 60% compared with uninvaded sites. At the time of planning, 24% of the 15,133-ha reserve system established by Orange County NCCP fell within 200 m of an urban or agricultural edge. With complete build out of lands surrounding the reserve, the proportion of the reserve system vulnerable to invasion will grow to 44%. Our data indicate that simply protecting designated areas from development is not enough. If habitat conservation plans are to fulfill their conservation promise of ecosystem-level protection, a more-integrated and systematic approach to the process of habitat conservation planning is needed.

  3. Strategic plan for infrastructure optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, C.D.

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less

  4. 14 CFR 420.59 - Launch site accident investigation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch site accident investigation plan... Licensee § 420.59 Launch site accident investigation plan. (a) General. A licensee shall develop and implement a launch site accident investigation plan that contains the licensee's procedures for reporting...

  5. 14 CFR 420.59 - Launch site accident investigation plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Launch site accident investigation plan... Licensee § 420.59 Launch site accident investigation plan. (a) General. A licensee shall develop and implement a launch site accident investigation plan that contains the licensee's procedures for reporting...

  6. INVESTIGATING THE EFFICACY OF CLINICAL TRIAL MONITORING STRATEGIES: Design and Implementation of the Cluster Randomized START Monitoring Substudy

    PubMed Central

    Hullsiek, Katherine Huppler; Kagan, Jonathan M; Engen, Nicole; Grarup, Jesper; Hudson, Fleur; Denning, Eileen T; Carey, Catherine; Courtney-Rodgers, David; Finley, Elizabeth B; Jansson, Per O; Pearson, Mary T; Peavy, Dwight E; Belloso, Waldo H

    2014-01-01

    Background Trial monitoring protects participant safety and study integrity. While monitors commonly go on-site to verify source data, there is little evidence that this practice is efficient or effective. An ongoing international HIV treatment trial (START) provides an opportunity to explore the usefulness of different monitoring approaches. Methods All START sites are centrally monitored and required to follow a local monitoring plan requiring specific quality assurance activities. Additionally, sites were randomized (1:1) to receive, or not receive, annual on-site monitoring. The study will determine if on-site monitoring increases the identification of major protocol deviations (eligibility or consent violations, improper study drug use, primary or serious event underreporting, data alteration or fraud). Results The START study completed enrollment in December 2013, with planned follow-up through December 2016. The monitoring study is ongoing at 196 sites in 34 countries. Results are expected when the START study concludes in December 2016. PMID:25973346

  7. Acquisition of background and technical information and class trip planning

    NASA Technical Reports Server (NTRS)

    Mackinnon, R. M.; Wake, W. H.

    1981-01-01

    Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.

  8. Summary and Comparison of Multiphase Streambed Scour Analysis at Selected Bridge Sites in Alaska

    USGS Publications Warehouse

    Conaway, Jeffrey S.

    2004-01-01

    The U.S. Geological Survey and the Alaska Department of Transportation and Public Facilities undertook a cooperative multiphase study of streambed scour at selected bridges in Alaska beginning in 1994. Of the 325 bridges analyzed for susceptibility to scour in the preliminary phase, 54 bridges were selected for a more intensive analysis that included site investigations. Cross-section geometry and hydraulic properties for each site in this study were determined from field surveys and bridge plans. Water-surface profiles were calculated for the 100- and 500-year floods using the Hydrologic Engineering Center?s River Analysis System and scour depths were calculated using methods recommended by the Federal Highway Administration. Computed contraction-scour depths for the 100- and 500-year recurrence-interval discharges exceeded 5 feet at six bridges, and pier-scour depths exceeded 10 feet at 24 bridges. Complex pier-scour computations were made at 10 locations where the computed contraction-scour depths would expose pier footings. Pressure scour was evaluated at three bridges where the modeled flood water-surface elevations intersected the bridge structure. Site investigation at the 54 scour-critical bridges was used to evaluate the effectiveness of the preliminary scour analysis. Values for channel-flow angle of attack and approach-channel width were estimated from bridge survey plans for the preliminary study and were measured during a site investigation for this study. These two variables account for changes in scour depths between the preliminary analysis and subsequent reanalysis for most sites. Site investigation is needed for best estimates of scour at bridges with survey plans that indicate a channel-flow angle of attack and for locations where survey plans did not include sufficient channel geometry upstream of the bridge.

  9. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.« less

  10. Child Care Centers in Park Settings.

    ERIC Educational Resources Information Center

    Giegerich & Associates, Inc., Rockville, MD.

    One of three studies of child care which addressed a variety of planning and site planning issues of concern to the Montgomery County Planning Board in Silver Spring, Maryland, this study reports findings related to the location of child care facilities in park settings. Principal purposes of the study were to: (1) analyze the community impact of…

  11. John F. Kennedy National Historic Site General Management Plan support : transportation study

    DOT National Transportation Integrated Search

    2010-09-01

    This report provides an overview of transportation and access issues related to the John F. Kennedy National Historic Site and the surrounding area in Brookline, MA. The study defines transportation-related goals for the site and provides support for...

  12. Atmospheric studies in complex terrain: a planning guide for future studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orgill, M.M.

    The objective of this study is to assist the US Department of Energy in Conducting its atmospheric studies in complex terrain (ASCOT0 by defining various complex terrain research systems and relating these options to specific landforms sites. This includes: (1) reviewing past meteorological and diffusion research on complex terrain; (2) relating specific terrain-induced airflow phenomena to specific landforms and time and space scales; (3) evaluating the technical difficulty of modeling and measuring terrain-induced airflow phenomena; and (4) avolving severdal research options and proposing candidate sites for continuing and expanding field and modeling work. To evolve research options using variable candidatemore » sites, four areas were considered: site selection, terrain uniqueness and quantification, definition of research problems and research plans. 36 references, 111 figures, 20 tables.« less

  13. Assessment of the Monitor Unit Objective tool for VMAT in the Eclipse treatment planning system.

    PubMed

    Jiménez-Puertas, Sara; Sánchez-Artuñedo, David; Hermida-López, Marcelino

    2018-01-01

    This work aims to achieve the highest possible monitor units (MU) reduction using the MU Objective tool included in the Eclipse treatment planning system, while preserving the plan quality. The treatment planning system Eclipse (Varian Medical Systems, Palo Alto, CA) includes a control mechanism for the number of monitor units of volumetric modulated arc therapy (VMAT) plans, named the MU Objective tool. Forty prostate plans, 20 gynecological plans and 20 head and neck plans designed with VMAT were retrospectively studied. Each plan ( base plan ) was optimized without using the MU Objective tool, and it was re-optimized with different values of the Maximum MU ( MaxMU ) parameter of the MU Objective tool. MU differences were analyzed with a paired samples t -test and changes in plan quality were assessed with a set of parameters for OARs and PTVs. The average relative MU difference [Formula: see text] considering all treatment sites, was the highest when MaxMU  = 400 (-4.2%, p  < 0.001). For prostate plans, the lowest [Formula: see text] was obtained (-3.7%, p  < 0.001). For head and neck plans [Formula: see text] was -7.3% ( p  < 0.001) and for gynecological plans [Formula: see text] was 7.0% ( p  = 0.002). Although similar MU reductions were observed for both sites, for some gynecological plans maximum differences were greater than 10%. All the assessed parameters for PTVs and OARs sparing showed average differences below 2%. For the three studied clinical sites, establishing MaxMU  = 400 led to the optimum MU reduction, maintaining the original dose distribution and dosimetric parameters practically unaltered.

  14. Biomass power for rural development. Technical progress report, January 1--March 31, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.

  15. The School Site Planner. Land for Learning. Site Selection, Site Planning, Playgrounds, Recreation, and Athletic Fields.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh. Div. of School Support.

    The selection and planning of sites for school facilities can be critical and difficult due to the varied and complex demands schools must satisfy. This publication addresses the many factors that need consideration during the process of site selection, planning, development, and use. The report examines not only the site selection and planning…

  16. 15 CFR 921.33 - Boundary changes, amendments to the management plan, and addition of multiple-site components.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... management plan, and addition of multiple-site components. 921.33 Section 921.33 Commerce and Foreign Trade... management plan, and addition of multiple-site components. (a) Changes in the boundary of a Reserve and major... management plan shall address goals and objectives for all components of the multi-site Reserve and the...

  17. Site safety plan for Lawrence Livermore National Laboratory CERCLA investigations at site 300. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilmer, J.

    Various Department of Energy Orders incorporate by reference, health and safety regulations promulgated by the Occupational Safety and Health Administration (OSHA). One of the OSHA regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response, requires that site safety plans are written for activities such as those covered by work plans for Site 300 environmental investigations. Based upon available data, this Site Safety Plan (Plan) for environmental restoration has been prepared specifically for the Lawrence Livermore National Laboratory Site 300, located approximately 15 miles east of Livermore, California. As additional facts, monitoring data, or analytical data on hazards are provided,more » this Plan may need to be modified. It is the responsibility of the Environmental Restoration Program and Division (ERD) Site Safety Officer (SSO), with the assistance of Hazards Control, to evaluate data which may impact health and safety during these activities and to modify the Plan as appropriate. This Plan is not `cast-in-concrete.` The SSO shall have the authority, with the concurrence of Hazards Control, to institute any change to maintain health and safety protection for workers at Site 300.« less

  18. Innovations in Site Characterization Case Study: Site Cleanup of the Wenatchee Tree Fruit Test Plot Site Using a Dynamic Work Plan

    EPA Pesticide Factsheets

    The Wenatchee Tree Fruit Research and Extension Center site contained soils contaminated with organochlorine pesticides, organophosphorus pesticides, and other pesticides due to agriculture-related research activities conducted from 1966 until...

  19. Planned residential units: New development trajectories

    NASA Astrophysics Data System (ADS)

    Fedchenko, Irina

    2017-01-01

    The paper summarizes the transformation patterns of functional, morphological, social, and administrative structures of planned residential units - district (Russia, Eastern Europe), neighborhood (USA), community (UK, Europe), as the smallest structural and planning elements of the settlements. The study is based on the author's own on-site survey of the existing and new planned residential units, as well as on the analysis of theoretical sources. The multidisciplinary analysis of the theoretical concepts and on-site survey results showed that planned residential units formed in the early twentieth century retain their social and planning importance and identity, evolve and acquire new features and forms. At the same time, according to the current regulatory and legal instruments they remain basic planning elements of urban structure in the early twenty-first century. This paper also includes experimental analysis of the theoretical concepts of planned residential units' transformation, their conceptual planning model and formation principles in the early twenty-first century.

  20. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.« less

  1. How Accessible Are Public Libraries' Web Sites? A Study of Georgia Public Libraries

    ERIC Educational Resources Information Center

    Ingle, Emma; Green, Ravonne A.; Huprich, Julia

    2009-01-01

    One issue that public librarians must consider when planning Web site design is accessibility for patrons with disabilities. This article reports a study of Web site accessibility of public libraries in Georgia. The focus of the report is whether public libraries use accessible guidelines and standards in making their Web sites accessible. An…

  2. SU-E-T-106: An Institutional Review of Using Commercially Available Software to Evaluate Treatment Plan Quality for Various Treatment Sites and Beam Deliveries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esquivel, C; Patton, L; Walker, S

    Purpose: Use Sun Nuclear Quality Reports™ with PlanIQ™ to evaluate different treatment delivery techniques for various treatment sites. Methods: Fifteen random patients with different treatment sites were evaluated. These include the Head/Neck, prostate, pelvis, lung, esophagus, axilla, bladder and abdomen. Initially, these sites were planned on the Pinnacle {sup 3} V9.6 treatment planning system and utilized nine 6MV step-n-shoot IMRT fields. The RT plan, dose and structure sets were sent to Quality Reports™ where a DVH was recreated and the plans were compared to a unique Plan Algorithm for each treatment site. Each algorithm has its own plan quality metricsmore » and objectives, which include the PTV coverage, PTV maximum dose, the prescription dose outside the target, doses to the critical structures, and the global maximum dose and its location. Each plan was scored base on meeting each objective. Plans may have been reoptimized and reevaluated with Quality Reports™ based on the initial score. PlanIQ™ was used to evaluate if any objective not met was achievable or difficult to obtain. A second plan using VMAT delivery was created for each patient and scored with Quality Reports™. Results: There were a wide range of scores for the different treatment sites with some scoring better for IMRT plans and some better for the VMAT deliveries. The variation in the scores could be attributed to the treatment site, location, and shape of the target. Most deliveries were chosen for the VMAT due to the short treatment times and quick patient throughput with acceptable plan scores. Conclusion: The tools are provided for both physician and dosimetrist to objectively evaluate the use of VMAT delivery versus the step-n-shoot IMRT delivery for various sites. PlanIQ validates if objectives can be met. For the physicist, a concise pass/fail report is created for plan evaluation.« less

  3. Solid waste management complex site development plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less

  4. Small Child Care Facilities in Residential Areas.

    ERIC Educational Resources Information Center

    Giegerich & Associates, Inc., Rockville, MD.

    One part of a three-part investigation prepared for the Montgomery County Planning Board in Silver Spring, Maryland, this study addresses planning and site planning issues arising from the location of child care facilities in residential settings. The study, which emphasizes homes and centers which care for 7 to 20 children, provides a detailed…

  5. Traditional-Aged College Juniors' Career Planning Self-Efficacy: A Case Study

    ERIC Educational Resources Information Center

    Sherman, Dawn C.

    2012-01-01

    The purpose of this single-site case study was to explore and describe traditional-age college juniors' reports of self-efficacy (Bandura, 1997) regarding Career Planning (Barker & Kellen, 1998). More specifically, the career planning confidence levels of college juniors enrolled in a required career development course at a private business…

  6. 1. Statement of significance, site plan, plan, elevation, section, boxcar ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Statement of significance, site plan, plan, elevation, section, boxcar spring details, and outhouse plan and elevation. - Woods Landing Dance Hall, 2731 State Highway 230, Woods Landing, Albany County, WY

  7. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    ERIC Educational Resources Information Center

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  8. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less

  9. Library Web Site Administration: A Strategic Planning Model For the Smaller Academic Library

    ERIC Educational Resources Information Center

    Ryan, Susan M.

    2003-01-01

    Strategic planning provides a useful structure for creating and implementing library web sites. The planned integration of a library's web site into its mission and objectives ensures that the library's community of users will consider the web site one of the most important information tools the library offers.

  10. The Nature Conservancy's Gulf Wings Project – A Case Study in Conservation Planning for Migratory Birds

    Treesearch

    Charles Duncan; Becky Abel; Danny Kwan; David Mehlman

    2005-01-01

    The Nature Conservancy has adopted a framework for mission success called Conservation by Design. We plan at the ecoregional level to define conservation targets and the portfolio of sites needed to protect them. We consider threats and strategies for abating them at these key sites, and we define measures of success to hold ourselves accountable. Migratory birds...

  11. Evaluation of site plan review procedures.

    DOT National Transportation Integrated Search

    1988-01-01

    The site plan review procedures of the Virginia Department of Transportation (VDOT) were evaluated. The objectives of the evaluation were to recommend (1) a set of site plan review procedures including a checklist, (2) definitions of the roles and re...

  12. Mars exobiology landing sites for future exploration

    NASA Technical Reports Server (NTRS)

    Landheim, Ragnhild; Greeley, Ronald; Desmarais, David; Farmer, Jack D.; Klein, Harold

    1993-01-01

    The selection of landing sites for Exobiology is an important issue for planning for future Mars missions. Results of a recent site selection study which focused on potential landing sites described in the Mars Landing Site Catalog are presented. In addition, basic Exobiology science objectives in Mars exploration are reviewed, and the procedures used in site evaluation and prioritization are outlined.

  13. Photographic copy of site plan for proposed Test Stand "D" ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of site plan for proposed Test Stand "D" in 1958. The contemporary site plans of test stands "A," "B," and "C" are also visible, along with the interconnecting tunnel system. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering "Site Plan for Proposed Test Stand "D" - Edwards Test Station," drawing no. ESP/22-0, 14 November 1958 - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  14. 76 FR 75875 - Plan for Conduct of 2012 Electric Transmission Congestion Study

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... DEPARTMENT OF ENERGY Plan for Conduct of 2012 Electric Transmission Congestion Study AGENCY... preparation of a study of electric transmission congestion pursuant to section 216(a)(1) of the Federal Power...-register at this Web site: http://energy.gov/oe/congestion-study-2012 . [[Page 75876

  15. The Challenge of Supporting a Beginning Teacher to Plan in Primary Mathematics

    ERIC Educational Resources Information Center

    Bailey, Judy

    2015-01-01

    Effective lesson planning is a real challenge for many beginning teachers. This paper presents a case study of one such teacher, and the author's efforts to support her in the planning process. Results show supporting the beginning teacher's planning by (a) providing access to resources such as web-sites and teaching handbooks, (b) modelling, and…

  16. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Burgoa, B.B.

    1993-12-01

    This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task.more » These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.« less

  17. The Campus Plan.

    ERIC Educational Resources Information Center

    Syracuse City School District, NY.

    This document digests a study made to examine the feasibility of plans for the future construction of all elementary educational facilities in Syracuse, New York. Four educational park sites are planned to house all elementary students. The first park provides for eight satellite schools accommodating 4,160 pupils, with special education…

  18. Master Environmental Plan for Fort Devens, Massachusetts

    DTIC Science & Technology

    1992-04-01

    sites located in proximity to each other were grouped together. The rationale for the order of priority assigned to the study areas in this section is...following priority categories: 1. High priority for action. All group 1 study areas have known contamination. Group IA includes sites that have ongoing...remedial investigations. Group 1B includes sites that have ongoing site inspections. 2. Moderate to high priority for action. Study areas in groups 3

  19. United States Air Force 611th Air Support Group Civil Engineering Squadron, Elmendorf AFB, Alaska. Remedial investigation and feasibility study Point Lay Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-03-04

    The United States Air Force (Air Force) has prepared this Remedial Investigation/Feasibility Study (RI/FS) report to present the results of RI/FS activities at four sites located at the Point Lay radar installation. The remedial investigation (RI) field activities were conducted at the Point Lay radar installation during the summer of 1993. The four sites at Point Lay were investigated because they were suspected of being contaminated with hazardous substances. RI activities were conducted using methods and procedures specified in the RI/FS Work Plan, Sampling and Analysis Plan (SAP), and Health and Safety Plan.

  20. Effectiveness of participatory planning for community management of fisheries in Bangladesh.

    PubMed

    Sultana, Parvin; Abeyasekera, Savitri

    2008-01-01

    This study provides statistical evidence that support for community-based management of resources was more effective when initiated through a process known as participatory action plan development (PAPD). Thirty-six sites were studied where community management of fisheries was facilitated by NGOs. All involved community participation and establishing local fisheries management institutions. However, communities were able to take up more conservation-related interventions and faced fewer conflicts in the 18 sites where a PAPD was the basis for collective action and institution development. This indicates the value and effectiveness of adopting good practice in participatory planning, such as PAPD, which helps diverse stakeholders find common problems and solutions for natural resource management.

  1. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Victoria Avenue to Citrus Groves) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  2. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    DTIC Science & Technology

    2012-05-22

    Planning 14 and airfields. Don’t want to clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base...clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base camp site location is chosen based on

  3. Delivery quality assurance with ArcCHECK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neilson, Christopher; Klein, Michael; Barnett, Rob

    2013-04-01

    Radiation therapy requires delivery quality assurance (DQA) to ensure that treatment is accurate and closely follows the plan. We report our experience with the ArcCHECK phantom and investigate its potential optimization for the DQA process. One-hundred seventy DQA plans from 84 patients were studied. Plans were classified into 2 groups: those with the target situated on the diodes of the ArcCHECK (D plans) and those with the target situated at the center (C plans). Gamma pass rates for 8 target sites were examined. The parameters used to analyze the data included 3%/3 mm with the Van Dyk percent difference criteriamore » (VD) on, 3%/3 mm with the VD off, 2%/2 mm with the VD on, and x/3 mm with the VD on and the percentage dosimetric agreement “x” for diode plans adjusted. D plans typically displayed maximum planned dose (MPD) on the cylindrical surface containing ArcCHECK diodes than center plans, resulting in inflated gamma pass rates. When this was taken into account by adjusting the percentage dosimetric agreement, C plans outperformed D plans by an average of 3.5%. ArcCHECK can streamline the DQA process, consuming less time and resources than radiographic films. It is unnecessary to generate 2 DQA plans for each patient; a single center plan will suffice. Six of 8 target sites consistently displayed pass rates well within our acceptance criteria; the lesser performance of head and neck and spinal sites can be attributed to marginally lower doses and increased high gradient of plans.« less

  4. National Wetland Mitigation Banking Study. Commercial Wetland Mitigation Credit Markets: Theory and Practice.

    DTIC Science & Technology

    1995-11-01

    based on established and incentive for Delta compliance. functioning replacement wetlands. Perhaps the most compelling reason given for why The permit...developed mitigation plans powerful incentive for ventures to carefully site, for the Cricket Creek site in accordance with the plan, and execute the...Opportunity. Lev, Esther (with field assistance by Peter Zika ) for the Lane County Council of Governments, 1988 (revised 1990), Preliminary Inventory of

  5. Site Plan & Site Section of Citrus Landscape (Showing Relationship ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan & Site Section of Citrus Landscape (Showing Relationship of Groves & Irrigation System to Grove Canal) - Arlington Heights Citrus Landscape, Southwestern portion of city of Riverside, Riverside, Riverside County, CA

  6. Postpartum Family Planning During Sociopolitical Transition: Findings from an Integrated Community-Based Program in Egypt.

    PubMed

    Cooper, Chelsea M; Charurat, Elaine; El-Adawi, Issam; Kim, Young-Mi; Emerson, Mark R; Zaki, Wael; Schuster, Anne

    2016-06-01

    Limited information exists on postpartum family planning and implementation of integrated reproductive and maternal and child health programs in countries experiencing sociopolitical transition. A quasi-experimental evaluation of an integrated reproductive and maternal and child health program implemented in selected sites in Upper and Lower Egypt was conducted between 2012 and 2014. Preintervention and postintervention household surveys were conducted among 12,454 women in intervention sites and nonintervention comparison sites who at survey had a child younger than 24 months. Bivariate and multivariate analyses estimated the intervention's effects on postpartum family planning-related outcomes, including contraceptive use, knowledge of optimal birthspacing, reproductive intentions and decision making about contraceptive use. In Upper Egypt, modern contraceptive use decreased over the study period in both intervention and comparison sites (by six and 15 percentage points, respectively), and in Lower Egypt, contraceptive use remained unchanged in intervention sites and decreased slightly (by three points) in comparison sites; in both regions, the intervention was positively associated with the difference in differences between groups (odds ratios, 1.5 for Upper Egypt and 1.3 for Lower Egypt). The intervention appears to have had a positive effect on knowledge of optimal birthspacing in Upper Egypt, on wanting to delay the next pregnancy in Lower Egypt, and on pregnancy risk and joint decision making in both regions. Study findings demonstrate the feasibility and effectiveness of an integrated reproductive and maternal and child health program implemented in a changing sociopolitical context. Revitalized efforts to bolster family planning within the country are needed to avert further losses and spark a return to positive trends.

  7. Illinois Tech Prep Planning Strategies.

    ERIC Educational Resources Information Center

    Illinois Univ., Urbana. Dept. of Vocational and Technical Education.

    This tech prep planning handbook is based on the research conducted at the Office of Community College Research and Leadership, University of Illinois at Urbana-Champaign. The study involved information gathering procedures at each of the 17 tech prep pilot sites about their planning activities. Seven sections are included: (1) tech prep in…

  8. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less

  9. Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan: Master Plan, Fort Custer, Michigan, Reservation Boundary and Land Use Map. USACOE, 31 December 1954 - Fort Custer Military Reservation, Bounded by Territorial, Dickman, & Longman Roads & Route 94 Business, Battle Creek, Calhoun County, MI

  10. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  11. 34. Site Plan: Fort Custer Air Force Station, Fort Custer, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Site Plan: Fort Custer Air Force Station, Fort Custer, Michigan, Modification of Electrical Distribution, General Site Plan, USACOE, no date. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  12. 10 CFR 60.16 - Site characterization plan required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding to...

  13. NASA/ESMD Analogue Mission Plans

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.

    2007-01-01

    A viewgraph presentation exploring Earth and its analogues is shown. The topics include: 1) ESMD Goals for the Use of Earth Analogues; 2) Stakeholders Summary; 3) Issues with Current Analogue Situation; 4) Current state of Analogues; 5) External Implementation Plan (Second Step); 6) Recent Progress in Utilizing Analogues; 7) Website Layout Example-Home Page; 8) Website Layout Example-Analogue Site; 9) Website Layout Example-Analogue Mission; 10) Objectives of ARDIG Analog Initiatives; 11) Future Plans; 12) Example: Cold-Trap Sample Return; 13) Example: Site Characterization Matrix; 14) Integrated Analogue Studies-Prerequisites for Human Exploration; and 15) Rating Scale Definitions.

  14. The MGTX Experience: Challenges in Planning and Executing an International, Multicenter Clinical Trial

    PubMed Central

    Aban, Inmaculada B.; Wolfe, Gil I.; Cutter, Gary R.; Kaminski, Henry J.; Jaretzki, Alfred; Minisman, Greg; Conwit, Robin; Newsom-Davis, John

    2008-01-01

    We present our experience planning and launching a multinational, NIH/NINDS funded study of thymectomy in myasthenia gravis. We highlight the additional steps required for international sites and analyze and contrast the time investment required to bring U.S. and non-U.S. sites into full regulatory compliance. Results show the mean time for non- U.S. centers to achieve regulatory approval was significantly longer (mean 13.4 ± 0.96 months) than for U.S. sites (9.67 ± 0.74 months; p = 0.003, t-test). The delay for non- U.S. sites was mainly attributable to Federalwide Assurance certification and State Department clearance. PMID:18675464

  15. Site scientific mission plan for the Southern Great Plains CART site, January-June 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, J.M.; Lamb, P.J.; Sisterson, D.L.

    1994-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1995, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Experiment Support Team [EST], Operations Team, Data Management Teammore » [DMT], Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods (IOPs). Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, The ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.« less

  16. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  17. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  18. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  19. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  20. 44 CFR 350.9 - Exercises.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...

  1. Master Plans for Park Sites.

    ERIC Educational Resources Information Center

    Van Meter, Jerry R.

    This booklet is a general guide to park site planning. The four basic steps involved in developing a park site are a) determination of the uses of the site, b) analysis of the site potential for these uses, c) identification of the functional relationship among the uses, and d) coordination of the uses to the park sites. Uses of park sites are…

  2. DOSIMETRIC CONSEQUENCES OF USING CONTRAST-ENHANCED COMPUTED TOMOGRAPHIC IMAGES FOR INTENSITY-MODULATED STEREOTACTIC BODY RADIOTHERAPY PLANNING.

    PubMed

    Yoshikawa, Hiroto; Roback, Donald M; Larue, Susan M; Nolan, Michael W

    2015-01-01

    Potential benefits of planning radiation therapy on a contrast-enhanced computed tomography scan (ceCT) should be weighed against the possibility that this practice may be associated with an inadvertent risk of overdosing nearby normal tissues. This study investigated the influence of ceCT on intensity-modulated stereotactic body radiotherapy (IM-SBRT) planning. Dogs with head and neck, pelvic, or appendicular tumors were included in this retrospective cross-sectional study. All IM-SBRT plans were constructed on a pre- or ceCT. Contours for tumor and organs at risk (OAR) were manually constructed and copied onto both CT's; IM-SBRT plans were calculated on each CT in a manner that resulted in equal radiation fluence. The maximum and mean doses for OAR, and minimum, maximum, and mean doses for targets were compared. Data were collected from 40 dogs per anatomic site (head and neck, pelvis, and limbs). The average dose difference between minimum, maximum, and mean doses as calculated on pre- and ceCT plans for the gross tumor volume was less than 1% for all anatomic sites. Similarly, the differences between mean and maximum doses for OAR were less than 1%. The difference in dose distribution between plans made on CTs with and without contrast enhancement was tolerable at all treatment sites. Therefore, although caution would be recommended when planning IM-SBRT for tumors near "reservoirs" for contrast media (such as the heart and urinary bladder), findings supported the use of ceCT with this dose calculation algorithm for both target delineation and IM-SBRT treatment planning. © 2015 American College of Veterinary Radiology.

  3. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  4. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  5. MULTI-MEDIA SAMPLING AND ANALYSIS AT A BIOSOLIDS LAND APPLICATION SITE

    EPA Science Inventory

    In response to the recommendations of the National Academy of Sciences in their recent review of EPA's Biosolids program, a study has been planned which will measure the emissions released from biosolids land application. This presentation summarizes the plans for that study and...

  6. High severity fire in forests of the southwest: Conservation implications. Progress Report August 2005

    USGS Publications Warehouse

    Haire, Sandra L.

    2006-01-01

    Here, we describe the first stages of our work in mapping burn severity at old and new burns as well as the work we have recently completed at our two field sites. The report is organized under our two main objectives with the purpose of summarizing the steps we have taken in working toward these objectives, as well as changes we have made in methodologies since the original study plan. We present some general observations and plans for the next steps in data analysis and product generation. This report, the study plan, a photograph gallery, slide presentations, and our contact information are available on the project Web site http://www.umass.edu/landeco/research/swfire/swfire.html .

  7. Water-quality assessment of south-central Texas: Occurrence and distribution of volatile organic compounds in surface water and ground water, 1983-94, and implications for future monitoring

    USGS Publications Warehouse

    Ging, P.B.; Judd, L.J.; Wynn, K.H.

    1997-01-01

    The study area of the South-Central Texas study unit of the National Water-Quality Assessment Program comprises the Edwards aquifer in the San Antonio region and its catchment area. The first phase of the assessment includes evaluation of existing water-quality data for surface water and ground water, including volatile organic compounds, to determine the scope of planned monitoring. Most analyses of volatile organic compounds in surface water are from the National Pollutant Discharge Elimination System sites in San Antonio, Texas. Nine volatile organic compounds were detected at the six sites. The three compounds with the most detections at National Pollutant Discharge Elimination System sites are 1,2,4-trimethylbenzene, toluene, and xylene. Analysis of volatile organic compounds in ground water was limited to Edwards aquifer wells. Twenty-eight volatile organic compounds were detected in samples from 89 wells. The five most commonly detected compounds in samples from wells, in descending order, are tetrachloroethene, trichloroethene, bromoform, chloroform, and dibromochloromethane. Detections of volatile organic compounds in surface water and ground water within the South-Central Texas study area are limited to site-specific sources associated with development; therefore, planned monitoring for possible detections of volatile organic compounds as part of the National Water-Quality Assessment Program will emphasize areas of expanding population and development. Monitoring of volatile organic compounds is planned at National Pollutant Discharge Elimination System sites, at basic fixed surface-water sites, and in the ground-water study-unit surveys.

  8. Validation of a Novel Electronic Health Record Patient Portal Advance Care Planning Delivery System.

    PubMed

    Bose-Brill, Seuli; Feeney, Michelle; Prater, Laura; Miles, Laura; Corbett, Angela; Koesters, Stephen

    2018-06-26

    Advance care planning allows patients to articulate their future care preferences should they no longer be able to make decisions on their own. Early advance care planning in outpatient settings provides benefits such as less aggressive care and fewer hospitalizations, yet it is underutilized due to barriers such as provider time constraints and communication complexity. Novel methods, such as patient portals, provide a unique opportunity to conduct advance care planning previsit planning for outpatient care. This follow-up to our pilot study aimed to conduct pragmatic testing of a novel electronic health record-tethered framework and its effects on advance care planning delivery in a real-world primary care setting. Our intervention tested a previsit advance care planning workflow centered around a framework sent via secure electronic health record-linked patient portal in a real-world clinical setting. The primary objective of this study was to determine its impact on frequency and quality of advance care planning documentation. We conducted a pragmatic trial including 2 sister clinical sites, one site implementing the intervention and the other continuing standard care. A total of 419 patients aged between 50 and 93 years with active portal accounts received intervention (n=200) or standard care (n=219). Chart review analyzed the presence of advance care planning and its quality and was graded with previously established scoring criteria based on advance care planning best practice guidelines from multiple nations. A total of 19.5% (39/200) of patients who received previsit planning responded to the framework. We found that the intervention site had statistically significant improvement in new advance care planning documentation rates (P<.01) and quality (P<.01) among all eligible patients. Advance care planning documentation rates increased by 105% (19/39 to 39/39) and quality improved among all patients who engaged in the previsit planning framework (n=39). Among eligible patients aged between 50 and 60 years at the intervention site, advance care planning documentation rates increased by 37% (27/96 to 37/96). Advance care planning documentation rates increased 34% among high users (27/67 to 36/67). Advance care planning previsit planning using a secure electronic health record-supported patient portal framework yielded improvement in the presence of advance care planning documentation, with highest improvement in active patient portal users and patients aged between 50 and 60 years. Targeted previsit patient portal advance care planning delivery in these populations can potentially improve the quality of care in these populations. ©Seuli Bose-Brill, Michelle Feeney, Laura Prater, Laura Miles, Angela Corbett, Stephen Koesters. Originally published in the Journal of Medical Internet Research (http://www.jmir.org), 26.06.2018.

  9. Roosevelt-Vanderbilt alternative transportation system planning study : phase 1

    DOT National Transportation Integrated Search

    2001-08-01

    This plan identifies components of a sustainable and effective alternative transportation system that will provide improved access to, and connections among, the Roosevelt-Vanderbilt National Historic Site units. The goal is to reduce the congestion ...

  10. 39. Photo copy of site plan, (original in Forest Service ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photo copy of site plan, (original in Forest Service Office, Elkins, WV, 'Parsons Nursery Special Use Permit, West Virginia Department of Natural Resources'), 1969. PARSONS NURSERY SITE PLAN. CORROLATES TO PARSONS NURSERY AT TIME OF FLOOD, NOVEMBER, 1985. - Parsons Nursery, South side of U.S. Route 219, Parsons, Tucker County, WV

  11. Estimating Cross-Site Impact Variation in the Presence of Heteroscedasticity

    ERIC Educational Resources Information Center

    Bloom, Howard S.; Porter, Kristin E.; Weiss, Michael J.; Raudenbush, Stephen

    2013-01-01

    To date, evaluation research and policy analysis have focused mainly on average program impacts and paid little systematic attention to their variation. Recently, the growing number of multi-site randomized trials that are being planned and conducted make it increasingly feasible to study "cross-site" variation in impacts. Important…

  12. Work plan for the radiological survey for the David Witherspoon, Incorporated, Landfill-1630 site, Knoxville, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This work plan establishes the methods and requirements for performing a radiological survey at the David Witherspoon, Incorporated, Landfill-1630 Site, Knoxville, Tennessee (DWI 1630 Site) in accordance with requirements under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The radiological survey will identify the radiological contamination level of the equipment and debris stored at the DWI 1630 Site. The data generated from the survey activities will support the decisions for characterization of the equipment/debris and aid in subsequent disposition and waste handling. The survey activities to be performed under this work plan include an equipment radiological survey,more » a walkover survey, and an immunoassay testing for polychlorinated biphenyls (PCBs). This work plan includes a quality assurance (QA)/quality control (QC) project plan, a health and safety (H&S) plan, and a waste management plan.« less

  13. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one ormore » more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.« less

  14. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  15. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  16. Site Plan, Brief History, Site Elevation, Main Gate Detail, Southern ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan, Brief History, Site Elevation, Main Gate Detail, Southern Live Oak (Quercus Virginiana) Information - Main Gate and Auburn Oaks at Toomer's Corner, Entrance to Auburn University's Campus, Intersection of West Magnolia Avenue and South College Street, Auburn, Lee County, AL

  17. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    EPA Pesticide Factsheets

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  18. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2011-12-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  19. Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deborah L. Layton; Kimberly Frerichs

    2010-07-01

    The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and themore » results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).« less

  20. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    PubMed

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  1. Cautious but Committed: Moving Toward Adaptive Planning and Operation Strategies for Renewable Energy's Wildlife Implications

    NASA Astrophysics Data System (ADS)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned—creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  2. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

  3. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  4. Postservice Occupational and Educational Plans of First-Tour Military Personnel Nearing Separation from the Service.

    ERIC Educational Resources Information Center

    Hoehn, Arthur J.

    The study surveyed the postservice educational and occupational plans of 3,946 first-tour enlisted personnel nearing separation from military service. Data were collected using a questionnaire administered at military sites during September-December 1971. Analyses were made to characterize the postservice plans of the respondents and to identify…

  5. A review of selection-based tests of abiotic surrogates for species representation.

    PubMed

    Beier, Paul; Sutcliffe, Patricia; Hjort, Jan; Faith, Daniel P; Pressey, Robert L; Albuquerque, Fabio

    2015-06-01

    Because conservation planners typically lack data on where species occur, environmental surrogates--including geophysical settings and climate types--have been used to prioritize sites within a planning area. We reviewed 622 evaluations of the effectiveness of abiotic surrogates in representing species in 19 study areas. Sites selected using abiotic surrogates represented more species than an equal number of randomly selected sites in 43% of tests (55% for plants) and on average improved on random selection of sites by about 8% (21% for plants). Environmental diversity (ED) (42% median improvement on random selection) and biotically informed clusters showed promising results and merit additional testing. We suggest 4 ways to improve performance of abiotic surrogates. First, analysts should consider a broad spectrum of candidate variables to define surrogates, including rarely used variables related to geographic separation, distance from coast, hydrology, and within-site abiotic diversity. Second, abiotic surrogates should be defined at fine thematic resolution. Third, sites (the landscape units prioritized within a planning area) should be small enough to ensure that surrogates reflect species' environments and to produce prioritizations that match the spatial resolution of conservation decisions. Fourth, if species inventories are available for some planning units, planners should define surrogates based on the abiotic variables that most influence species turnover in the planning area. Although species inventories increase the cost of using abiotic surrogates, a modest number of inventories could provide the data needed to select variables and evaluate surrogates. Additional tests of nonclimate abiotic surrogates are needed to evaluate the utility of conserving nature's stage as a strategy for conservation planning in the face of climate change. © 2015 Society for Conservation Biology.

  6. 28. Site Plan: AF Station P67, Fort Custer, Michigan, Plot ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. Site Plan: AF Station P-67, Fort Custer, Michigan, Plot Plan (to accompany FY 1956 project planning report), USACOE, 22 July 1954. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  7. Climate Change Resilience Planning at the Department of Energy's Savannah River Site

    NASA Astrophysics Data System (ADS)

    Werth, D. W.; Johnson, A.

    2015-12-01

    The Savannah River National Laboratory (SRNL) is developing a site sustainability plan for the Department of Energy's Savannah River Site (SRS) in South Carolina in accordance with Executive Order 13693, which charges each DOE agency with "identifying and addressing projected impacts of climate change" and "calculating the potential cost and risk to mission associated with agency operations". The plan will comprise i) projections of climate change, ii) surveys of site managers to estimate the effects of climate change on site operations, and iii) a determination of adaptive actions. Climate change projections for SRS are obtained from multiple sources, including an online repository of downscaled global climate model (GCM) simulations of future climate and downscaled GCM simulations produced at SRNL. Taken together, we have projected data for temperature, precipitation, humidity, and wind - all variables with a strong influence on site operations. SRNL is working to engage site facility managers and facilitate a "bottom up" approach to climate change resilience planning, where the needs and priorities of stakeholders are addressed throughout the process. We make use of the Vulnerability Assessment Scoring Tool, an Excel-based program designed to accept as input various climate scenarios ('exposure'), the susceptibility of assets to climate change ('sensitivity'), and the ability of these assets to cope with climate change ('adaptive capacity'). These are combined to produce a series of scores that highlight vulnerabilities. Working with site managers, we have selected the most important assets, estimated their expected response to climate change, and prepared a report highlighting the most endangered facilities. Primary risks include increased energy consumption, decreased water availability, increased forest fire danger, natural resource degradation, and compromised outdoor worker safety in a warmer and more humid climate. Results of this study will aid in driving future management decisions and promoting sustainable practices at SRS.

  8. Planning a multi-site, complex intervention for homeless people with mental illness: the relationships between the national team and local sites in Canada's At Home/Chez Soi project.

    PubMed

    Nelson, Geoffrey; Macnaughton, Eric; Goering, Paula; Dudley, Michael; O'Campo, Patricia; Patterson, Michelle; Piat, Myra; Prévost, Natasha; Strehlau, Verena; Vallée, Catherine

    2013-06-01

    This research focused on the relationships between a national team and five project sites across Canada in planning a complex, community intervention for homeless people with mental illness called At Home/Chez Soi, which is based on the Housing First model. The research addressed two questions: (a) what are the challenges in planning? and (b) what factors that helped or hindered moving project planning forward? Using qualitative methods, 149 national, provincial, and local stakeholders participated in key informant or focus group interviews. We found that planning entails not only intervention and research tasks, but also relational processes that occur within an ecology of time, local context, and values. More specifically, the relationships between the national team and the project sites can be conceptualized as a collaborative process in which national and local partners bring different agendas to the planning process and must therefore listen to, negotiate, discuss, and compromise with one another. A collaborative process that involves power-sharing and having project coordinators at each site helped to bridge the differences between these two stakeholder groups, to find common ground, and to accomplish planning tasks within a compressed time frame. While local context and culture pushed towards unique adaptations of Housing First, the principles of the Housing First model provided a foundation for a common approach across sites and interventions. The implications of the findings for future planning and research of multi-site, complex, community interventions are noted.

  9. 21 CFR 822.35 - Can you inspect my manufacturing site or other sites involved in my postmarket surveillance plan?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Can you inspect my manufacturing site or other sites involved in my postmarket surveillance plan? 822.35 Section 822.35 Food and Drugs FOOD AND DRUG... Records and Reports § 822.35 Can you inspect my manufacturing site or other sites involved in my...

  10. Research Plan for Study of Biological and Ecological Effects of the Solar Power Satellite Transmission System

    NASA Technical Reports Server (NTRS)

    Newsom, B. D.

    1978-01-01

    A programmatic research plan for a three year study is presented to generate knowledge on effects of the continuous wave 2.45 GHz microwave power transmission that the Solar Power Satellite might have on biological and ecological elements, within and around the rectenna receiving site.

  11. Correlating planned radiation dose to the cochlea with primary site and tumor stage in patients with head and neck cancer treated with intensity-modulated radiation therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Jeanette; Qureshi, Muhammad M.; Kovalchuk, Nataliya

    The aim of the study was to determine tumor characteristics that predict higher planned radiation (RT) dose to the cochlea in patients with head and neck cancer (HNC) treated with intensity-modulated radiotherapy (IMRT). From 2004 to 2012, 99 patients with HNC underwent definitive IMRT to a median dose of 69.96 Gy in 33 fractions, with the right and left cochlea-vestibular apparatus contoured for IMRT optimization as avoidance structures. If disease involvement was adjacent to the cochlea, preference was given to tumor coverage by prescription dose. Descriptive statistics were calculated for dose-volume histogram planning data, and mean planning dose to themore » cochlea (from left or right cochlea, receiving the greater amount of RT dose) was correlated to primary site and tumor stage. Mean (standard deviation) cochlear volume was 1.0 (0.60) cm{sup 3} with maximum and mean planned doses of 31.9 (17.5) Gy and 22.1 (13.7) Gy, respectively. Mean planned dose (Gy) to cochlea by tumor site was as follows: oral cavity (18.6, 14.4), oropharynx (21.7, 9.1), nasopharynx (36.3, 10.4), hypopharynx (14.9, 7.1), larynx (2.1, 0.62), others including the parotid gland, temporal bone, and paranasal sinus (33.6, 24.0), and unknown primary (25.6, 6.7). Average mean planned dose (Gy) to the cochlea in T0-T2 and T3-T4 disease was 22.0 and 29.2 Gy, respectively (p = 0.019). By site, a significant difference was noted for nasopharynx and others (31.6 and 50.7, p = 0.012) but not for oropharynx, oral cavity, and hypopharynx. Advanced T category predicted for higher mean cochlear dose, particularly for nasopharyngeal, parotid gland, temporal bone, and paranasal sinus HNC sites.« less

  12. The Role of Publicly Funded Family Planning Sites In Health Insurance Enrollment.

    PubMed

    Yarger, Jennifer; Daniel, Sara; Biggs, M Antonia; Malvin, Jan; Brindis, Claire D

    2017-06-01

    Publicly funded family planning providers are well positioned to help uninsured individuals learn about health insurance coverage options and effectively navigate the enrollment process. Understanding how these providers are engaged in enrollment assistance and the challenges they face in providing assistance is important for maximizing their role in health insurance outreach and enrollment. In 2014, some 684 sites participating in California's family planning program were surveyed about their involvement in helping clients enroll in health insurance. Weighted univariate and bivariate analyses were conducted to examine enrollment activities and perceived barriers to facilitating enrollment by site characteristics. Most family planning program sites provided eligibility screening (68%), enrollment education (77%), on-site enrollment assistance (55%) and referrals for off-site enrollment support (91%). The proportion of sites offering each type of assistance was highest among community clinics (83-96%), primary care and multispecialty sites (65-95%), Title X-funded sites (72-98%), sites with contracts to provide primary care services (64-93%) and sites using only electronic health records (66-94%). Commonly identified barriers to providing assistance were lack of staff time (reported by 52% of sites), lack of funding (47%), lack of physical space (34%) and lack of staff knowledge (33%); only 20% of sites received funding to support enrollment activities. Although there were significant variations among them, publicly funded family planning providers in California are actively engaged in health insurance enrollment. Supporting their vital role in enrollment could help in the achievement of universal health insurance coverage. Copyright © 2017 by the Guttmacher Institute.

  13. Environmental sciences information storage and retrieval system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Engstrom, D.E.; White, M.G.; Dunaway, P.B.

    Reynolds Electrical and Engineering Co., Inc. (REECo), has since 1970 accumulated information relating to the AEC's Nevada Applied Ecology Group (NAEG) programs at the Nevada Test Site (NTS). These programs, involving extensive soil, vegetation, and small-animal studies, have generated informational data concerning the collecting, processing, analyzing, and shipping of sample materials to various program participants and contractors. Future plans include incorporation of Lawrence Livermore Laboratory's resuspension study data, REECo's on-site air data, and EPA's large-animal, off-site air, and off-site soil data. (auth)

  14. Development and implementation of a scrub habitat compensation plan for Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Schmalzer, Paul A.; Breininger, David R.; Adrian, Frederic W.; Schaub, Ron; Duncan, Brean W.

    1994-01-01

    Kennedy Space Center (KSC), located on Merritt Island on the east coast of central Florida, is one of three remaining major populations of the Florida Scrub Jay (Aphelocoma coerulescens coerulescens), listed as threatened by the U.S. Fish and Wildlife Service (USFWS) since 1987. Construction of new facilities by the National Aeronautics and Space Administration (NASA) on KSC over the next five years has the potential to impact up to 193 ac (78.1 ha) of Scrub Jay habitat. Under an early consultation process with the Endangered Species Office of the USFWS, NASA agreed to a compensation plan for loss of Scrub Jay habitat. The compensation plan required NASA to restore or create scrub on KSC at a 2:1 ratio for that lost. The compensation plan emphasized restoration of scrub habitat that is of marginal or declining suitability to Scrub Jays because it has remained unburned. Although prescribed burning has been conducted by the USFWS Merritt Island National Wildlife Refuge (MINWR) for more than ten years, significant areas of scrub remain unburned because they have been excluded from fire management units or because landscape fragmentation and a period of fire suppression allowed scrub to reach heights and diameters that are fire resistant. For such areas, mechanical cutting followed by prescribed burning was recommended for restoration. A second part of the restoration plan is an experimental study of scrub reestablishment (i.e., creation) on abandoned, well drained agricultural sites by planting scrub oaks and other scrub plants. The compensation plan identified 260 ac (105 ha) of scrub restoration in four areas and a 40 ac (16 ha) scrub creation site. Monitoring of restoration sites required under the plan included: establishing permanent vegetation sample transects before treatment and resampling annually for ten years after treatment, and color banding Scrub Jays to determine territories prior to treatment followed by monitoring reproductive success and survival for ten years after treatment. Monitoring scrub creation sites included determining survival of planted material for five years and establishing permanent transects to follow vegetation development for ten years after planting. Scrub Jay monitoring of creation sites is incorporated with that of adjacent restoration sites.

  15. Field studies of beach cones as coastal erosion control/reversal devices for areas with significant oil and gas activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-17

    A field demonstration/study of a novel shoreline erosion protection device called beach cones is planned. These patented, fiberglass- reinforced concreted devices are to be deployed in a number of geometric patterns at seven location in the Bastian Bay area of Western Plaquemines Parish. The purpose of the work described in this report was to evaluate the proposed study's impact on living and non-living shellfish resources within each of the project's seven separate Study Areas. Major accomplishments for this reporting period were as follows: aerial photographs of the experimental sites were taken; all permit applications were filed; information was submitted formore » the Environmental Report; several reconnaissance trips to the experimental sites were made; meetings were held among all participating organizations to further plan the research; permit was obtained from the US Army Corps of Engineers; test sites were surveyed by the Xavier University contingent; survey data were taken at all sites; the Oyster Assessment was completed; permit was obtained from the State of Louisiana Department of Natural Resources; and initial survey data were finalized at all sites.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goltz, M.N.; Carrothers, T.J.; Hopkins, G.D.

    A full-scale study of in situ bioremediation is being planned for implementation at a trichloroethylene (TCE) contaminated site at Edwards Air Force Base. To support the demonstration, laboratory studies of sorption and biodegradation were performed. Column studies conducted with TCE and Edwards aquifer material determined the sorption distribution coefficient to be 0.1 millileters per gram, corresponding to a 1.5 retardation factor. Edwards aquifer material from four different depths was used to study cometabolic TCE biodegradation in the presence of toluene under aerobic conditions. The studies showed steady state TCE removal of greater than or equal to 85% in the microcosms.more » A base line simulation was performed using a computer model which incorporated all significant flow and transport processes. The simulation shows how TCE mass declines in both the dissolved and sorbed phases over the four months planned for the demonstration. Based on these preliminary studies, it appears that the planned operation of the bioremediation system can be expected to result in observable decreases in TCE mass and concentration at the Edwards demonstration site.« less

  17. CEO Sites Mission Management System (SMMS)

    NASA Technical Reports Server (NTRS)

    Trenchard, Mike

    2014-01-01

    Late in fiscal year 2011, the Crew Earth Observations (CEO) team was tasked to upgrade its science site database management tool, which at the time was integrated with the Automated Mission Planning System (AMPS) originally developed for Earth Observations mission planning in the 1980s. Although AMPS had been adapted and was reliably used by CEO for International Space Station (ISS) payload operations support, the database structure was dated, and the compiler required for modifications would not be supported in the Windows 7 64-bit operating system scheduled for implementation the following year. The Sites Mission Management System (SMMS) is now the tool used by CEO to manage a heritage Structured Query Language (SQL) database of more than 2,000 records for Earth science sites. SMMS is a carefully designed and crafted in-house software package with complete and detailed help files available for the user and meticulous internal documentation for future modifications. It was delivered in February 2012 for test and evaluation. Following acceptance, it was implemented for CEO mission operations support in April 2012. The database spans the period from the earliest systematic requests for astronaut photography during the shuttle era to current ISS mission support of the CEO science payload. Besides logging basic image information (site names, locations, broad application categories, and mission requests), the upgraded database management tool now tracks dates of creation, modification, and activation; imagery acquired in response to requests; the status and location of ancillary site information; and affiliations with studies, their sponsors, and collaborators. SMMS was designed to facilitate overall mission planning in terms of site selection and activation and provide the necessary site parameters for the Satellite Tool Kit (STK) Integrated Message Production List Editor (SIMPLE), which is used by CEO operations to perform daily ISS mission planning. The CEO team uses the SMMS for three general functions - database queries of content and status, individual site creation and updates, and mission planning. The CEO administrator of the science site database is able to create or modify the content of sites and activate or deactivate them based on the requirements of the sponsors. The administrator supports and implements ISS mission planning by assembling, reporting, and activating mission-specific site selections for management; deactivating sites as requirements are met; and creating new sites, such as International Charter sites for disasters, as circumstances warrant. In addition to the above CEO internal uses, when site planning for a specific ISS mission is complete and approved, the SMMS can produce and export those essential site database elements for the mission into XML format for use by onboard Earth-location systems, such as Worldmap. The design, development, and implementation of the SMMS resulted in a superior database management system for CEO science sites by focusing on the functions and applications of the database alone instead of integrating the database with the multipurpose configuration of the AMPS. Unlike the AMPS, it can function and be modified within the existing Windows 7 environment. The functions and applications of the SMMS were expanded to accommodate more database elements, report products, and a streamlined interface for data entry and review. A particularly elegant enhancement in data entry was the integration of the Google Earth application for the visual display and definition of site coordinates for site areas defined by multiple coordinates. Transfer between the SMMS and Google Earth is accomplished with a Keyhole Markup Language (KML) expression of geographic data (see figures 3 and 4). Site coordinates may be entered into the SMMS panel directly for display in Google Earth, or the coordinates may be defined on the Google Earth display as a mouse-controlled polygonal definition and transferred back into the SMMS as KML input. This significantly reduces the possibility of errors in coordinate entries and provides visualization of the scale of the site being defined. CEO now has a powerful tool for managing and defining sites on the Earth's surface for both targets of astronaut photography or other onboard remote sensing systems. It can also record and track results by sponsor, collaborator, or type of study.

  18. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are beingmore » made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.« less

  19. 17. Photographic copy of intial site plan for North Base: ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of intial site plan for North Base: AF Job No. 1045, Military Construction: Muroc Bombing Range, Muroc Lake, California; Materiel Test Site: Location Plan, Sheet No. 1 of 11, May 1942. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  20. Scoping study of integrated resource planning needs in the public utility sector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garrick, C J; Garrick, J M; Rue, D R

    Integrated resource planning (IRP) is an approach to utility resource planning that integrates the evaluation of supply- and demand-site options for providing energy services at the least cost. Many utilities practice IRP; however, most studies about IRP focus on investor-owned utilities (IOUs). This scoping study investigates the IRP activities and needs of public utilities (not-for-profit utilities, including federal, state, municipal, and cooperative utilities). This study (1) profiles IRP-related characteristics of the public utility sector, (2) articulates the needs of public utilities in understanding and implementing IRP, and (3) identifies strategies to advance IRP principles in public utility planning.

  1. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  2. Intergenerational equity and long-term stewardship plans.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hocking, E. K.

    2002-02-05

    For an untold number of contaminated sites throughout the world, stewardship will be inevitable. For many such sites, stewardship will be a reasonable approach because of the uncertainties associated with present and future site conditions and site contaminants, the limited performance of available technologies, the nonavailability of technologies, and the risk and cost associated with complete cleanup. Regardless of whether stewardship is a realistic approach to site situations or simply a convenient default, it could be required at most contaminated sites for multiple generations. Because the stewardship plan is required to protect the release of hazardous contaminants to the environment,more » some use restrictions will be put in place to provide that protection. These use restrictions will limit access to resources for as long as the protection is required. The intergenerational quality of long-term stewardship plans and their inherent limitations on resource use require that they be designed to achieve equity among the affected generations. Intergenerational equity, defined here as the fairness of access to resources across generations, could be achieved through a well-developed stewardship plan that provides future generations with the information they need to make wise decisions about resource use. Developing and implementing such a plan would take into account the failure mechanisms of the plan's components, feature short stewardship time blocks that would allow for periodic reassessments of the site and of the stewardship program's performance, and provide present and future generations with necessary site information.« less

  3. Site 300 Spill Prevention, Control, and Countermeasures (SPCC) Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.; Mertesdorf, E.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less

  4. Site 300 SPCC Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Experimental Test Site (Site 300) near Tracy, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations, Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67more » of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at Site 300. This SPCC Plan has been prepared for the entire Site 300 facility and replaces the three previous plans prepared for Site 300: LLNL SPCC for Electrical Substations Near Buildings 846 and 865 (LLNL 2015), LLNL SPCC for Building 883 (LLNL 2015), and LLNL SPCC for Building 801 (LLNL 2014).« less

  5. Developing a programmatic approach to investigating and remediating many unrelated comprehensive environmental response, compensation, and liability act sites at Kelly Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kamp, G.; Regan, P.; Ninesteel, R.

    1988-01-01

    Kelly Air Force Base (AFB), which was founded in 1917, is involved in logistics and maintenance activities supporting the Air Logistics Command. In addition, Kelly AFB hosts over 50 tenant organizations representing the Air Force, Department of Defense, and other government agencies. Over the years waste disposal from this complex was conducted in a manner that led to the identification of over 30 sites to be included in the Installation Restoration Program (IRP) after the Phase 1 investigation. A methodology was needed to prioritize the Remedial Investigations and Feasibility Study (RI/FS) activities for the sites. A Strategy Plan was developedmore » that involved reviewing and interpreting existing data, identifying data voids relative to site specific RI/FS activities, and developing methodology to prioritize activities. Sites were prioritized, and a comprehensive IRP planning document was developed. One data deficiency was revealed -- the lack of understanding of the Basewide hydrogeologic conditions necessary to establish an effective restoration program. A Hydrogeologic Investigation was initiated to provide this data. This data will allow better interpretation of the interaction of the sites, particularly those in close proximity, and improved planning of remediation activities.« less

  6. Teaching World History and Global Issues with the Internet

    ERIC Educational Resources Information Center

    Risinger, C. Frederick

    2011-01-01

    In this article, the author recommends websites that include both traditional world history content and sites that focus on contemporary world issues and problems. The first two sites provide an intellectual stage for both world history and global studies. While they don't have lesson plans or links to other sites, they provide an understanding of…

  7. LAKE PONTCHARTRAIN ESTUARY CONSERVATION PLAN

    EPA Science Inventory

    The Nature Conservancy will conduct a series of a least four science expert workshops to develop a Site Conservation Plan for the Lake Pontchartrain Estuary and adjacent wetlands. The objective of the Site Conservation Plan is to identify conservation targets, threats or stresse...

  8. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  9. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  10. 7 CFR 1948.53 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... program. (l) Growth management planning. Planning for the orderly development of an approved designated... services needed; overall plans for the coordinated development of all approved designated areas within a... identification of: housing sites; housing site development needs; data and resource needs; funding needs...

  11. 78 FR 31941 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-28

    ... burden 810 RISE Staff Pre-Test 157 1 .25 39 RISE Staff Post-Test 157 1 .25 39 RISE burden 78 Estimated... addition, evaluation plans were developed to support rigorous site-specific and cross-site studies to... and Lesbian Center's Recognize Intervene Support Empower (RISE) project. A third phase of the study...

  12. 3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. PHOTOGRAPHIC COPY OF MASTER PLAN, DETAIL SITE PLAN, 7TH CAVALRY BUILDINGS, DATED SEPTEMBER 10, 1951, SEE ARROW, DRAWING # BM-036, COPY ON FILE IN THE ENVIRONMENTAL MANAGEMENT OFFICE, FORT BLISS - Fort Bliss, 7th Cavalry Buildings, U.S. Army Air Defence Artillery Center & Fort Bliss, El Paso, El Paso County, TX

  13. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH),more » Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.« less

  14. SAMPLING OF CONTAMINATED SITES

    EPA Science Inventory

    A critical aspect of characterization of the amount and species of contamination of a hazardous waste site is the sampling plan developed for that site. f the sampling plan is not thoroughly conceptualized before sampling takes place, then certain critical aspects of the limits o...

  15. Reducing unplanned pregnancy and abortion in Zimbabwe through postabortion contraception.

    PubMed

    Johnson, Brooke R; Ndhlovu, Singatsho; Farr, Sherry L; Chipato, Tsungai

    2002-06-01

    In many countries, women treated for complications from spontaneous or unsafely induced abortion lack access to contraceptive services. As a result, many of them soon have a subsequent unplanned pregnancy or a repeat abortion, placing their health at increased risk. This report presents the results of a prospective intervention study on postabortion family planning conducted in the two largest public hospitals in Zimbabwe. Women at Harare Central Hospital, in the capital, received a postabortion family planning intervention, and Mpilo Central Hospital, in Bulawayo, served as the control site. The study cohort was 982 women, 527 of whom were followed for a 12-month period. During the follow-up period, significantly more women used highly effective methods of contraception, significantly fewer unplanned pregnancies occurred, and fewer repeat abortions were performed at the intervention site than at the control site. These results offer compelling evidence that ward-based contraceptive services provided to women treated for incomplete abortion can significantly reduce subsequent unplanned pregnancies. The results also suggest that postabortion family planning services can reduce the incidence of repeat abortion.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  17. On-site or off-site treatment of medical waste: a challenge

    PubMed Central

    2014-01-01

    Treating hazardous-infectious medical waste can be carried out on-site or off-site of health-care establishments. Nevertheless, the selection between on-site and off-site locations for treating medical waste sometimes is a controversial subject. Currently in Iran, due to policies of Health Ministry, the hospitals have selected on-site-treating method as the preferred treatment. The objectives of this study were to assess the current condition of on-site medical waste treatment facilities, compare on-site medical waste treatment facilities with off-site systems and find the best location of medical waste treatment. To assess the current on-site facilities, four provinces (and 40 active hospitals) were selected to participate in the survey. For comparison of on-site and off-site facilities (due to non availability of an installed off-site facility) Analytical Hierarchy Process (AHP) was employed. The result indicated that most on-site medical waste treating systems have problems in financing, planning, determining capacity of installations, operation and maintenance. AHP synthesis (with inconsistency ratio of 0.01 < 0.1) revealed that, in total, the off-site treatment of medical waste was in much higher priority than the on-site treatment (64.1% versus 35.9%). According to the results of study it was concluded that the off-site central treatment can be considered as an alternative. An amendment could be made to Iran’s current medical waste regulations to have infectious-hazardous waste sent to a central off-site installation for treatment. To begin and test this plan and also receive the official approval, a central off-site can be put into practice, at least as a pilot in one province. Next, if it was practically successful, it could be expanded to other provinces and cities. PMID:24739145

  18. Planning and conducting a multi-institutional project on fatigue.

    PubMed

    Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E

    1998-09-01

    To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.

  19. Field studies of beach cones as coastal erosion control/reversal devices for areas with significant oil and gas activities. Technical progress report, April--June 1992 and Project status report, June 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-17

    A field demonstration/study of a novel shoreline erosion protection device called beach cones is planned. These patented, fiberglass- reinforced concreted devices are to be deployed in a number of geometric patterns at seven location in the Bastian Bay area of Western Plaquemines Parish. The purpose of the work described in this report was to evaluate the proposed study`s impact on living and non-living shellfish resources within each of the project`s seven separate Study Areas. Major accomplishments for this reporting period were as follows: aerial photographs of the experimental sites were taken; all permit applications were filed; information was submitted formore » the Environmental Report; several reconnaissance trips to the experimental sites were made; meetings were held among all participating organizations to further plan the research; permit was obtained from the US Army Corps of Engineers; test sites were surveyed by the Xavier University contingent; survey data were taken at all sites; the Oyster Assessment was completed; permit was obtained from the State of Louisiana Department of Natural Resources; and initial survey data were finalized at all sites.« less

  20. Exercises in Emergency Preparedness for Health Professionals in Community Clinics

    PubMed Central

    Blossom, H. John; Sandrock, Christian; Mitchell, Brenda; Brandstein, Kendra

    2010-01-01

    Health professionals in community settings are generally unprepared for disasters. From 2006 to 2008 the California Statewide Area Health Education Center (AHEC) program conducted 90 table top exercises in community practice sites in 18 counties. The exercises arranged and facilitated by AHEC trained local coordinators and trainers were designed to assist health professionals in developing and applying their practice site emergency plans using simulated events about pandemic influenza or other emergencies. Of the 1,496 multidisciplinary health professionals and staff participating in the exercises, 1,176 (79%) completed learner evaluation forms with 92–98% of participants rating the training experiences as good to excellent. A few reported helpful effects when applying their training to a real time local disaster. Assessments of the status of clinic emergency plans using 15 criteria were conducted at three intervals: when the exercises were scheduled, immediately before the exercises, and for one-third of sites, three months after the exercise. All sites made improvements in their emergency plans with some or all of the plan criteria. Of the sites having follow up, most (N = 23) were community health centers that made statistically significant changes in two-thirds of the plan criteria (P = .001–.046). Following the exercises, after action reports were completed for 88 sites and noted strengths, weaknesses, and plans for improvements in their emergency plans Most sites (72–90%) showed improvements in how to activate their plans, the roles of their staff, and how to participate in a coordinated response. Challenges in scheduling exercises included time constraints and lack of resources among busy health professionals. Technical assistance and considerations of clinic schedules mitigated these issues. The multidisciplinary table top exercises proved to be an effective means to develop or improve clinic emergency plans and enhance the dialogue and coordination among health professionals before an emergency happens. PMID:20146093

  1. Hanford Site Asbestos Abatement Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mewes, B.S.

    The Hanford Site Asbestos Abatement Plan (Plan) lists priorities for asbestos abatement activities to be conducted in Hanford Site facilities. The Plan is based on asbestos assessment information gathered in fiscal year 1989 that evaluated all Hanford Site facilities for the presence and condition of asbestos. Of those facilities evaluated, 414 contain asbestos-containing materials and are classified according to the potential risk of asbestos exposure to building personnel. The Plan requires that asbestos condition update reports be prepared for all affected facilities. The reporting is completed by the asbestos coordinator for each of the 414 affected facilities and transmitted tomore » the Plan manager annually. The Plan manager uses this information to reprioritize future project lists. Currently, five facilities are determined to be Class Al, indicating a high potential for asbestos exposure. Class Al and B1 facilities are the highest priority for asbestos abatement. Abatement of the Class A1 and Bl facilities is scheduled through fiscal year 1997. Removal of asbestos in B1 facilities will reduce the risk for further Class ``A`` conditions to arise.« less

  2. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  3. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  4. 38 CFR 39.32 - Plan preparation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...

  5. Evaluation of online consumer medication information.

    PubMed

    Kim, Karissa Y; Metzger, Anne; Wigle, Patricia R; Choe, Pearl J

    2011-06-01

    Millions of Americans search the Internet for health-related information; however, the readability and comprehensiveness of consumer medication information (CMI) on the Internet has not been widely studied. The purpose of this study was to evaluate the readability and comprehensiveness of online CMI. The readability and comprehensiveness of consumer drug information found on 3 well-known Web sites (Medline Plus, Yahoo Health, and WebMD) was evaluated; in particular, information related to 10 commonly prescribed medications. Readability was assessed using the Simple Measure of Gobbledygook (SMOG) and Fry Readability Graph (FRG) tools; comprehensiveness of information was evaluated using the Keystone action plan criteria. Using SMOG, the mean reading level of each Web site was 13th grade level or higher. Using the FRG, the mean reading level was 10th grade or higher. Out of the 24 points in the Keystone action plan criteria, information found on each of the Web sites was deemed accurate with mean score of 21, 21, and 19 for Medline Plus, Yahoo Health, and WebMD, respectively. For the medications reviewed, CMI found on Web sites was accurate when assessed using the Keystone action plan criteria. The readability levels were higher than the recommended sixth grade level. Copyright © 2011 Elsevier Inc. All rights reserved.

  6. A Vision for the Future: Site-Based Strategic Planning.

    ERIC Educational Resources Information Center

    Herman, Jerry J.

    1989-01-01

    Presents a model to help principals with strategic planning. Success hinges on involving stakeholders, scanning for relevant data, identifying critical success factors, developing vision and mission statements, analyzing the site manager's supports and constraints, creating strategic goals and objectives, developing action plans, allocating…

  7. EPA Helps Two New England Communities Plan New Uses for Former Brownfield Sites

    EPA Pesticide Factsheets

    The U.S.EPA has selected the City of Providence, RI & the Eastern Maine Development Corp. to receive funding to assist with planning for cleanup & reuse of Brownfield sites as part of the Brownfields Area-Wide Planning (AWP) program.

  8. Interim Courses: The World as a Classroom.

    ERIC Educational Resources Information Center

    Shiflet, George W. Jr.; Shealy, Malcolm H., Jr.

    1989-01-01

    Described are some of the considerations necessary in planning a field studies course in the tropics. Discussed are site selection; planning and preparation; course structure; the advantages of travel courses; and recommendations concerning liability, multiple instructors, hotels, sailboats, and tours. A list of 26 references is included. (CW)

  9. Urban waterfowl population: Ecological evaluation of management and planning

    NASA Astrophysics Data System (ADS)

    Greer, David M.

    1982-05-01

    An urban population of ducks in Puyallup, Washington, USA was studied for 14 consecutive months beginning in November 1978. Observations were made weekly from four study sites where ducks would congregate at early morning hours. Factors contributing to the presence of waterfowl in Puyallyup included abundant food supplies and a creek corridor that connected fragmented habitats in the urban area to the larger rural populations of waterfowl. Mallards ( Anas platyrhynchos) were the most abundant of the 13 species observed and were the only ducks remaining during the nesting season. Habitat size and complexity were important factors influencing the species diversity of a particular site. Nesting success of mallards was poor due to limited distribution of nesting habitat, intraspecific aggression, and human disturbance. Both site-specific and more broad-based strategies are suggested for managing and planning for duck populations in urban areas.

  10. Tales from the New Frontier: Pioneers' Experiences with Consumer-Driven Health Care

    PubMed Central

    Lo Sasso, Anthony T; Rice, Thomas; Gabel, Jon R; Whitmore, Heidi

    2004-01-01

    Objective To conduct site visits to study the early experiences of firms offering consumer-driven health care (CDHC) plans to their employees and firms that provide CDHC products. Data Sources/Study Setting A convenience sample of three firms offering CDHC products to their employees, one of which is also a large insurer, and one firm offering an early CDHC product to employers. Study Design We conducted onsite interviews of four companies during the spring and summer of 2003. These four cases were not selected randomly. We contacted organizations that already had a consumer-driven plan in place by January 2002 so as to provide a complete year's worth of experience with CDHC. Principal Findings The experience of the companies we visited indicated that favorable selection tends to result when a CDHC plan is introduced alongside traditional preferred provider organization (PPO) and health maintenance organization (HMO) plan offerings. Two sites demonstrated substantial cost-savings. Our case studies also indicate that the more mundane aspects of health care benefits are still crucial under CDHC. The size of the provider network accessible through the CDHC plan was critical, as was the role of premium contributions in the benefit design. Also, companies highlighted the importance of educating employees about new CDHC products: employees who understood the product were more likely to enroll. Conclusions Our site visits suggest the peril (risk selection) and the promise (cost savings) of CDHC. At this point there is still far more that we do not know about CDHC than we do know. Little is known about the extent to which CDHC changes people's behavior, the extent to which quality of care is affected by CDHC, and whether web-based information and tools actually make patients become better consumers. PMID:15230912

  11. Public concerns about and perceptions of solid waste dump sites and selection of sanitary landfill sites in the West Bank, Palestinian territory.

    PubMed

    Al-Khatib, Issam A; Abu Hammad, Ahmad; Sharkas, Othman A; Sato, Chikashi

    2015-04-01

    Palestinian inhabitants have disposed of their solid wastes at open dumpsites over the past 40 years without an adequate solid waste management (SWM) plans. Recently, the Palestinian Authority initiated SWM planning to establish controlled sanitary landfills, based on a participatory approach. The purpose of this study was to assess public concerns about existing solid waste dumpsites and public perceptions of sanitary landfill site selection. The study will also take into consideration the effect of diverse social, economic, and environmental related factors of the inhabitants on sitting suitable landfill sites in three Palestinian districts in the West Bank, namely, "Nablus," "Salfit," and "Ramallah and Al-Bireh." The results of this study showed that 64.9% of the sample population are aware of the problems and potential impacts associated with random dumpsites, and 41.6% think that they are suffering from the dumps. Among the environmental, socioeconomic, and political factors, the environmental factors, air pollution in particular, are thought be the most important consideration in selecting a landfill site. The "fairness in selecting a landfill site" was chosen to be one of the most important socioeconomic factors, possibly as a reaction to the Israeli occupation and subsequent land use restrictions in the West Bank, Palestinian territory.

  12. Methods of linking mothers and infants using health plan data for studies of pregnancy outcomes.

    PubMed

    Johnson, Karin E; Beaton, Sarah J; Andrade, Susan E; Cheetham, T Craig; Scott, Pamela E; Hammad, Tarek A; Dashevsky, Inna; Cooper, William O; Davis, Robert L; Pawloski, Pamala A; Raebel, Marsha A; Smith, David H; Toh, Sengwee; Li, De-Kun; Haffenreffer, Katherine; Dublin, Sascha

    2013-07-01

    Research on medication safety in pregnancy often utilizes health plan and birth certificate records. This study discusses methods used to link mothers with infants, a crucial step in such research. We describe how eight sites participating in the Medication Exposure in Pregnancy Risk Evaluation Program created linkages between deliveries, infants and birth certificates for the 2001-2007 birth cohorts. We describe linkage rates across sites, and for two sites, we compare the characteristics of populations linked using different methods. Of 299,260 deliveries, 256,563 (86%; range by site, 74-99%) could be linked to infants using a deterministic algorithm. At two sites, using birth certificate data to augment mother-infant linkage increased the representation of mothers who were Hispanic or non-White, younger, Medicaid recipients, or had low educational level. A total of 236,460 (92%; range by site, 82-100%) deliveries could be linked to a birth certificate. Tailored approaches enabled linking most deliveries to infants and to birth certificates, even when data systems differed. The methods used may affect the composition of the population identified. Linkages established with such methods can support sound pharmacoepidemiology studies of maternal drug exposure outside the context of a formal registry. Copyright © 2013 John Wiley & Sons, Ltd.

  13. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  14. 23. Photographic copy of an asconstructed site plan for North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of an as-constructed site plan for North Base: Air Force Flight Test Center, Edwards Air Force Base, Edwards, California: North Base Site Plan, February 1970. This drawing shows the North Base building distribution substantially as it appears in 1995. Records on file at AFFTC/CE-CECC-B (Design/Construction Flight/RPMC), Edwards AFB, California. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  15. What Teens Want to Know: Sexual Health Questions Submitted to a Teen Web Site

    ERIC Educational Resources Information Center

    Vickberg, Suzanne M. Johnson; Kohn, Julia E.; Franco, Lydia M.; Criniti, Shannon

    2003-01-01

    In 1999 Planned Parenthood[R] Federation of America (PPFA[R]) launched teenwire.com[SM], a Web site for young people. This study was designed to determine teens' reproductive health information needs. Selected for analysis were 1,219 submissions to the Ask the Experts section of the Web site. Each submission was independently coded by three of the…

  16. Integrated medical and behavioral laboratory measurement system engineering analysis and laboratory specification

    NASA Technical Reports Server (NTRS)

    Grave, C.; Margold, D. W.

    1973-01-01

    Site selection, program planning, cost and design studies for support of the IMBLMS program were investigated. Accomplishments are reported for the following areas: analysis of responses to site selection criteria, space-oriented biotechnology, life sciences payload definition, and program information transfer.

  17. Health and safety plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cofer, G.H.; Holt, V.L.; Roupe, G.W.

    1993-11-01

    This health and safety plan (HASP) was developed by the members of the Measurement Applications and Development Group of the Health Science Research Division at the Oak Ridge National Laboratory (ORNL). This plan was prepared to ensure that health and safety related items for the Waste Area Grouping (WAG) 2 Remedial Investigation (RI)/Feasibility Study and Site Investigation projects conform with the requirements of 29 CFR 1910.120 (April 18, 1992). The RI Plan calls for the characterization, monitoring, risk assessment, and identification of remedial needs and alternatives that have been structured and staged with short-term and long-term objectives. In early FYmore » 1992, the WAG 2 RI was integrated with the ORNL Environmental Restoration (ER) Site Investigations program in order to achieve the complimentary objectives of the projects more effectively by providing an integrated basis of support. The combined effort was named the WAG 2 Remedial Investigation and Site Investigations Program (WAG 2 RI&SI). The Site Investigation activities are a series of monitoring efforts and directed investigations that support other ER activities by providing information about (1) watershed hydrogeology; (2) contaminants, pathways, and fluxes for groundwater at ORNL; (3) shallow subsurface areas that can act as secondary sources of contaminants; and (4) biological populations and contaminants in biota, in addition to other support and coordination activities.« less

  18. Is there a clinical benefit with a smooth compensator design compared with a plunged compensator design for passive scattered protons?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tabibian, Art A., E-mail: art.tabibian@gmail.com; Powers, Adam; Dolormente, Keith

    In proton therapy, passive scattered proton plans use compensators to conform the dose to the distal surface of the planning volume. These devices are custom made from acrylic or wax for each treatment field using either a plunge-drilled or smooth-milled compensator design. The purpose of this study was to investigate if there is a clinical benefit of generating passive scattered proton radiation treatment plans with the smooth compensator design. We generated 4 plans with different techniques using the smooth compensators. We chose 5 sites and 5 patients for each site for the range of dosimetric effects to show adequate sample.more » The plans were compared and evaluated using multicriteria (MCA) plan quality metrics for plan assessment and comparison using the Quality Reports [EMR] technology by Canis Lupus LLC. The average absolute difference for dosimetric metrics from the plunged-depth plan ranged from −4.7 to +3.0 and the average absolute performance results ranged from −6.6% to +3%. The manually edited smooth compensator plan yielded the best dosimetric metric, +3.0, and performance, + 3.0% compared to the plunged-depth plan. It was also superior to the other smooth compensator plans. Our results indicate that there are multiple approaches to achieve plans with smooth compensators similar to the plunged-depth plans. The smooth compensators with manual compensator edits yielded equal or better target coverage and normal tissue (NT) doses compared with the other smooth compensator techniques. Further studies are under investigation to evaluate the robustness of the smooth compensator design.« less

  19. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  20. 15 CFR 921.10 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ESTUARINE RESEARCH RESERVE SYSTEM REGULATIONS Site Selection, Post Site Selection and Management Plan... of site selection, preparation of documents specified in § 921.13 (draft management plan (DMP) and... recovered as a result of damage to natural resources located in the coastal zone, such assistance may be...

  1. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  2. MONROE COMMUNITY COLLEGE CAMPUS PLAN.

    ERIC Educational Resources Information Center

    Caudill, Rowlett, Scott and Associates, Bryan, TX.

    THE MASTER PLANS FOR THE CONSTRUCTION OF THE CAMPUS OF THE NEW MONROE COMMUNITY COLLEGE INCLUDE EDUCATIONAL SPECIFICATIONS, SITE ANALYSIS DATA AND BUILDING PLANS. THE EDUCATIONAL SPECIFICATIONS ARE BASED UPON COMMUNITY NEEDS AND ENROLLMENT PROJECTIONS, AND REFLECT SPACE REQUIREMENTS. IN THE SITE ANALYSIS, FACTORS SUCH AS TOPOGRAPHY, CLIMATE,…

  3. Site support program plan for ICF Kaiser Hanford Company

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  4. Computer-assisted selection of donor sites for autologous grafts

    NASA Astrophysics Data System (ADS)

    Krol, Zdzislaw; Zeilhofer, Hans-Florian U.; Sader, Robert; Hoffmann, Karl-Heinz; Gerhardt, Paul; Horch, Hans-Henning

    1997-05-01

    A new method is proposed for a precise planning of autologous bone grafts in cranio- and maxillofacial surgery. In patients with defects of the facial skeleton, autologous bone transplants can be harvested from various donor sites in the body. The preselection of a donor site depends i.a. on the morphological fit of the available bone mass and the shape of the part that is to be transplanted. A thorough planning and simulation of the surgical intervention based on 3D CT studies leads to a geometrical description and the volumetric characterization of the bone part to be resected and transplanted. Both, an optimal fit and a minimal lesion of the donor site are guidelines in this process. We use surface similarity and voxel similarity measures in order to select the optimal donor region for an individually designed transplant.

  5. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  6. Collaborative Inquiry for Equity: Discipline and Discomfort

    ERIC Educational Resources Information Center

    Winkelman, Peg

    2012-01-01

    In this study the discipline of collaborative inquiry is employed to prepare aspiring administrators to lead for equity. Educational leadership students are required to conduct a site-based collaborative inquiry resulting in an Equity Plan signature assignment. As they develop their Equity Plans, emerging leaders also participate in a…

  7. Schools as Open Social Systems: A Study of Site Specific Restructuring.

    ERIC Educational Resources Information Center

    Dellar, Graham B.

    This paper revisits the literature on the nature of school organizations and presents a view of secondary schools as complex social systems, as opposed to bureaucratic-rational structures. Research was conducted into three Western Australia secondary schools planning to implement school-based decision making and planning procedures. The…

  8. Stormwater Management Plan for the Arden Hills Army Training Site, Arden Hills, Minnesota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carr, Adrianne E.; Wuthrich, Kelsey K.; Ziech, Angela M.

    2013-03-01

    This stormwater management plan focuses on the cantonment and training areas of the Arden Hills Army Training Site (AHATS). The plan relates the site stormwater to the regulatory framework, and it summarizes best management practices to aide site managers in promoting clean site runoff. It includes documentation for a newly developed, detailed model of stormwater flow retention for the entire AHATS property and adjacent upgradient areas. The model relies on established modeling codes integrated in a U.S. Department of Defense-sponsored software tool, the Watershed Modeling System (WMS), and it can be updated with data on changes in land use ormore » with monitoring data.« less

  9. Site Plan: A First Step.

    ERIC Educational Resources Information Center

    Gould, Bryant; Finci, David

    1986-01-01

    A campus-wide site plan looks at the campus as a whole and defines immediate and long-range problems and potential. Text and photographs illustrate site development at McClennan Community College in Waco, Texas, and at the University of Toledo and the University of Dayton, both in Ohio. (MLF)

  10. Work Plan for Comprehensive Groundwater Sampling - 2012 (Operable Unit 2), LCP Chemicals Site, Brunswick, GA

    EPA Pesticide Factsheets

    April 2012 plan to conduct a comprehensive sampling of groundwater from all wells in the site-wide monitoring well network, at the LCP Chemicals Site in Brunswick, GA. Region ID: 04 DocID: 10843427, DocDate: 04-01-2012

  11. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  12. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  13. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  14. 33. Site Plan: Custer Air Force Station, Battle Creek, Michigan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    33. Site Plan: Custer Air Force Station, Battle Creek, Michigan, FD Radar Facilities-FPS-27, Electrical Plot Plan and Duet Details, USACOE, not date. - Fort Custer Military Reservation, P-67 Radar Station, .25 mile north of Dickman Road, east of Clark Road, Battle Creek, Calhoun County, MI

  15. 21. Photographic copy of a keyed site plan for North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photographic copy of a keyed site plan for North Base: Military Construction, Muroc Flight Test Base, Muroc, California; General Layout Plan, December 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  16. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  17. SCHOOL SITES. SELECTION AND DEVELOPMENT.

    ERIC Educational Resources Information Center

    REIDA, G.W.

    CERTAIN CRITICAL CRITERIA SHOULD BE CONSIDERED IN SELECTING THE SCHOOL SITE. IMPORTANT IS THE STUDY OF SUCH FACTORS AS PRESENT AND PROJECTED PUPIL POPULATION, THE SCHOOL MASTER PLAN, MAIN THOROUGHFARES, DWELLINGS, LAND USE, SOILS, (SHOWN BY SERVICE MAPS), EXISTING SCHOOL FACILITIES AND ATTENDANCE, BOUNDARIES, UTILITY SERVICES AND FLOOD CONTROLS.…

  18. CINRG: Infrastructure for Clinical Trials in Duchenne Dystrophy

    DTIC Science & Technology

    2013-09-01

    research centers sharing a common goal of improving the quality of life of neuromuscular disease patients by cooperative planning , implementation, analysis...discrepancies were noted surrounding the regulatory binder, consent process and data records. The site personnel have a scheduled plan with the CINRG CC...missing long term follow-up visits). The project manager also reviewed the study records to date while onsite. A high priority plan was developed with the

  19. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less

  20. Shuttle abort landing site emergency medical services

    NASA Technical Reports Server (NTRS)

    Mckenas, David K.; Jennings, Richard T.

    1991-01-01

    NASA and DOD studies of medical-planning and logistical problems are reviewed as applicable to providing emergency medical care at remote transoceanic abort landing (TAL) sites. Two options are analyzed including a modified surgical response team and a combination physician/medical technician team. The two concepts are examined in terms of cost-effectiveness, specific types of medical support such as blood procurement, and search-and-rescue requirements. It is found that the physician/technician team is more economically efficient, and the description of the concept permits the development of an effective TAL-site astronaut medical-support system. A balance is struck between the competing problems of cost and medical capability by planning for on-scene medical stabilization and air evacuation to DOD tertiary medical centers.

  1. Environmental Development cum Forest Plantation Planning and Management.

    ERIC Educational Resources Information Center

    Katoch, C. D.

    This textbook covers environmental conservation through forest plantation planning and management for all levels of forestry professionals and non-professionals in India and abroad. The book is divided into six parts and 29 sections in sequential order. Part I contains details on site selection, site preparations, site clearance, layout, and…

  2. THE SCHOOL SITE--ITS SELECTION, ANALYSIS, DEVELOPMENT AND MAINTENANCE.

    ERIC Educational Resources Information Center

    BRUNING, WALTER F.

    SCHOOL ADMINISTRATORS AND COMMUNITY PLANNERS CAN AID THE SCHOOL SITE SELECTION PROCESS BY WORKING TOGETHER ON A COMMUNITY MASTER PLAN. MANY COMMUNITIES HAVE DEVELOPED SUCH A PLAN UNDER THE STATE AND FEDERALLY AIDED 701 PROGRAM. SOUND SITE SELECTION PRINCIPLES REQUIRE CONSIDERATION OF OTHER FACTORS THAN STUDENT POPULATION DISTRIBUTION. IDEALLY…

  3. Outdoor Education - A Guide to Site Planning and Implementation of Programs.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin. Div. of Curriculum Development.

    This booklet presents guidelines for initiating outdoor instructional programs. Initially, the guide lists the objectives of outdoor education: survival, recreation, development of personal health and well-being, career opportunities, and social adjustment. A discussion follows on the three phases of site planning. The first phase is site analysis…

  4. Preliminary soil-site studies in the western white pine type

    Treesearch

    Otis L. Copeland

    1956-01-01

    A guide for estimating site quality on bare, cut-over, or burned-over lands in the western white pine type is needed for planning the management of these lands. On many areas trees may be entirely lacking or an insufficient number in the proper crown classes remain on which reliable site index determinations can be based. Therefore, reliance must be placed on some...

  5. Maritime Spatial Planning supported by systematic site selection: Applying Marxan for offshore wind power in the western Baltic Sea

    PubMed Central

    Dahl, Karsten; Mohn, Christian

    2018-01-01

    The development of offshore wind energy and other competing interests in sea space are a major incentive for designating marine and coastal areas for specific human activities. Maritime Spatial Planning (MSP) considers human activities at sea in a more integrated way by analysing and designating spatial and temporal distributions of human activities based on ecological, economic and social targets. However, specific tools supporting spatial decisions at sea incorporating all relevant sectors are rarely adopted. The decision support tool Marxan is traditionally used for systematic selection and designation of nature protection and conservation areas. In this study, Marxan was applied as a support tool to identify suitable sites for offshore wind power in the pilot area Pomeranian Bight / Arkona Basin in the western Baltic Sea. The software was successfully tested and scenarios were developed that support the sites indicated in existing national plans, but also show options for alternative developments of offshore wind power in the Pomeranian Bight / Arkona Basin area. PMID:29543878

  6. SU-F-T-538: CyberKnife with MLC for Treatment of Large Volume Tumors: A Feasibility Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bichay, T; Mayville, A

    2016-06-15

    Purpose: CyberKnife is a well-documented modality for SRS and SBRT treatments. Typical tumors are small and 1–5 fractions are usually used. We determined the feasibility of using CyberKnife, with an InCise multileaf collimator option, for larger tumors undergoing standard dose and fractionation. The intent was to understand the limitation of using this modality for other external beam radiation treatments. Methods: Five tumors from different anatomical sites with volumes from 127.8 cc to 1,320.5 cc were contoured and planned on a Multiplan V5.1 workstation. The target average diameter ranged from 7 cm to 13 cm. The dose fractionation was 1.8–2.0 Gy/fractionmore » and 25–45 fractions for total doses of 45–81 Gy. The sites planned were: pancreas, head and neck, prostate, anal, and esophagus. The plans were optimized to meet conventional dose constraints based on various RTOG protocols for conventional fractionation. Results: The Multiplan treatment planning system successfully generated clinically acceptable plans for all sites studied. The resulting dose distributions achieved reasonable target coverage, all greater than 95%, and satisfactory normal tissue sparing. Treatment times ranged from 9 minutes to 38 minutes, the longest being a head and neck plan with dual targets receiving different doses and with multiple adjacent critical structures. Conclusion: CyberKnife, with the InCise multileaf collimation option, can achieve acceptable dose distributions in large volume tumors treated with conventional dose and fractionation. Although treatment times are greater than conventional accelerator time; target coverage and dose to critical structures can be kept within a clinically acceptable range. While time limitations exist, when necessary CyberKnife can provide an alternative to traditional treatment modalities for large volume tumors.« less

  7. Opportunities in SMR Emergency Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne L.

    2014-10-01

    Using year 2014 cost information gathered from twenty different locations within the current commercial nuclear power station fleet, an assessment was performed concerning compliance costs associated with the offsite emergency Planning Standards contained in 10 CFR 50.47(b). The study was conducted to quantitatively determine the potential cost benefits realized if an emergency planning zone (EPZ) were reduced in size according to the lowered risks expected to accompany small modular reactors (SMR). Licensees are required to provide a technical basis when proposing to reduce the surrounding EPZ size to less than the 10 mile plume exposure and 50 mile ingestion pathwaymore » distances currently being used. To assist licensees in assessing the savings that might be associated with such an action, this study established offsite emergency planning costs in connection with four discrete EPZ boundary distances, i.e., site boundary, 2 miles, 5 miles and 10 miles. The boundary selected by the licensee would be based on where EPA Protective Action Guidelines are no longer likely to be exceeded. Additional consideration was directed towards costs associated with reducing the 50 mile ingestion pathway EPZ. The assessment methodology consisted of gathering actual capital costs and annual operating and maintenance costs for offsite emergency planning programs at the surveyed sites, partitioning them according to key predictive factors, and allocating those portions to individual emergency Planning Standards as a function of EPZ size. Two techniques, an offsite population-based approach and an area-based approach, were then employed to calculate the scaling factors which enabled cost projections as a function of EPZ size. Site-specific factors that influenced source data costs, such as the effects of supplemental funding to external state and local agencies for offsite response organization activities, were incorporated into the analysis to the extent those factors could be representatively apportioned.« less

  8. Integrating family planning and HIV services in western Kenya: the impact on HIV-infected patients' knowledge of family planning and male attitudes toward family planning.

    PubMed

    Onono, Maricianah; Guzé, Mary A; Grossman, Daniel; Steinfeld, Rachel; Bukusi, Elizabeth A; Shade, Starley; Cohen, Craig R; Newmann, Sara J

    2015-01-01

    Little information exists on the impact of integrating family planning (FP) services into HIV care and treatment on patients' familiarity with and attitudes toward FP. We conducted a cluster-randomized trial in 18 public HIV clinics with 12 randomized to integrated FP and HIV services and 6 to the standard referral-based system where patients are referred to an FP clinic. Serial cross-sectional surveys were done before (n = 488 women, 486 men) and after (n = 479 women, 481 men) the intervention to compare changes in familiarity with FP methods and attitudes toward FP between integrated and nonintegrated (NI) sites. We created an FP familiarity score based on the number of more effective FP methods patients could identify (score range: 0-6). Generalized estimating equations were used to control for clustering within sites. An increase in mean familiarity score between baseline (mean = 5.16) and post-intervention (mean = 5.46) occurred with an overall mean change of 0.26 (95% confidence intervals [CI] = 0.09, 0.45; p = 0.003) across all sites. At end line, there was no difference in increase of mean FP familiarity scores at intervention versus control sites (mean = 5.41 vs. 5.49, p = 0.94). We observed a relative decrease in the proportion of males agreeing that FP was "women's business" at integrated sites (baseline 42% to end line 30%; reduction of 12%) compared to males at NI sites (baseline 35% to end line 42%; increase of 7%; adjusted odds ration [aOR] = 0.43; 95% CI = 0.22, 0.85). Following FP-HIV integration, familiarity with FP methods increased but did not differ by study arm. Integration was associated with a decrease in negative attitudes toward FP among men.

  9. Water supply studies. [management and planning of water supplies in California

    NASA Technical Reports Server (NTRS)

    Burgy, R. H.; Algazi, V. R.; Draeger, W. C.; Churchman, C. W.; Thomas, R. W.; Lauer, D. T.; Hoos, I.; Krumpe, P. F.; Nichols, J. D.; Gialdini, M. J.

    1973-01-01

    The primary test site for water supply investigations continues to be the Feather River watershed in northeastern California. This test site includes all of the area draining into and including the Oroville Reservoir. The principal effort is to determine the extent to which remote sensing techniques, when properly employed, can provide information useful to those persons concerned with the management and planning of lands and facilities for the production of water, using the Oroville Reservoir and the California Water Project as the focus for the study. In particular, emphasis is being placed on determining the cost effectiveness of information derived through remote sensing as compared with that currently being derived through more conventional means.

  10. Digital Database of Selected Aggregate and Related Resources in Ada, Boise, Canyon, Elmore, Gem, and Owyhee Counties, Southwestern Idaho

    USGS Publications Warehouse

    Moyle, Phillip R.; Wallis, John C.; Bliss, James D.; Bolm, Karen D.

    2004-01-01

    The U.S. Geological Survey (USGS) compiled a database of aggregate sites and geotechnical sample data for six counties - Ada, Boise, Canyon, Elmore, Gem, and Owyhee - in southwest Idaho as part of a series of studies in support of the Bureau of Land Management (BLM) planning process. Emphasis is placed on sand and gravel sites in deposits of the Boise River, Snake River, and other fluvial systems and in Neogene lacustrine deposits. Data were collected primarily from unpublished Idaho Transportation Department (ITD) records and BLM site descriptions, published Army Corps of Engineers (ACE) records, and USGS sampling data. The results of this study provides important information needed by land-use planners and resource managers, particularly in the BLM, to anticipate and plan for demand and development of sand and gravel and other mineral material resources on public lands in response to the urban growth in southwestern Idaho.

  11. Temporary disaster debris management site identification using binomial cluster analysis and GIS.

    PubMed

    Grzeda, Stanislaw; Mazzuchi, Thomas A; Sarkani, Shahram

    2014-04-01

    An essential component of disaster planning and preparation is the identification and selection of temporary disaster debris management sites (DMS). However, since DMS identification is a complex process involving numerous variable constraints, many regional, county and municipal jurisdictions initiate this process during the post-disaster response and recovery phases, typically a period of severely stressed resources. Hence, a pre-disaster approach in identifying the most likely sites based on the number of locational constraints would significantly contribute to disaster debris management planning. As disasters vary in their nature, location and extent, an effective approach must facilitate scalability, flexibility and adaptability to variable local requirements, while also being generalisable to other regions and geographical extents. This study demonstrates the use of binomial cluster analysis in potential DMS identification in a case study conducted in Hamilton County, Indiana. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  12. Volumetric modulated arc therapy: a review of current literature and clinical use in practice

    PubMed Central

    Teoh, M; Clark, C H; Wood, K; Whitaker, S; Nisbet, A

    2011-01-01

    Volumetric modulated arc therapy (VMAT) is a novel radiation technique, which can achieve highly conformal dose distributions with improved target volume coverage and sparing of normal tissues compared with conventional radiotherapy techniques. VMAT also has the potential to offer additional advantages, such as reduced treatment delivery time compared with conventional static field intensity modulated radiotherapy (IMRT). The clinical worldwide use of VMAT is increasing significantly. Currently the majority of published data on VMAT are limited to planning and feasibility studies, although there is emerging clinical outcome data in several tumour sites. This article aims to discuss the current use of VMAT techniques in practice and review the available data from planning and clinical outcome studies in various tumour sites including prostate, pelvis (lower gastrointestinal, gynaecological), head and neck, thoracic, central nervous system, breast and other tumour sites. PMID:22011829

  13. 13. Photographic copy of site plan displaying Test Stand 'C' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of site plan displaying Test Stand 'C' (4217/E-18), Test Stand 'D' (4223/E-24), and Control and Recording Center (4221/E-22) with ancillary structures, and connecting roads and services. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office 'Repairs to Test Stand 'C,' Edwards Test Station, Legend & Site Plan M-1,' drawing no. ESP/115, August 14, 1987. - Jet Propulsion Laboratory Edwards Facility, Test Stand C, Edwards Air Force Base, Boron, Kern County, CA

  14. 27. "SITE PLAN." Specifications No. OC15775, Drawing No. AF600915, sheet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. "SITE PLAN." Specifications No. OC1-57-75, Drawing No. AF-60-09-15, sheet 1 of 96, D.O. Series No. AF 1394/20, Rev. B. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 5296 Rev. B, Date: 11/17/59. Site plan of 20,000-foot track, including construction phasing notes. - Edwards Air Force Base, South Base Sled Track, Edwards Air Force Base, North of Avenue B, between 100th & 140th Streets East, Lancaster, Los Angeles County, CA

  15. Off-site Emergency Planning at UK Nuclear Licensed Sites.

    PubMed

    Leonard, Paul; Thomas, Gareth

    2017-04-01

    Nuclear emergency planning arrangements in the UK are continually kept under review. This work proposes to outline how experience from nuclear exercises and undertaking emergency response duties can be based on radiological knowledge of specific sites and utilised in the future. In 2014, the UK regulator, the Office for Nuclear Regulation (ONR) revised their principles for the determination of off-site emergency planning areas around nuclear sites where predetermined countermeasures and other protection measures are applied to protect those people who may be affected by a radiation emergency. The revised principles also enhanced communication from the nuclear site operators and local authorities to the public. This updated ONR's application of the UK Radiation (Emergency Preparedness and Public Information) Regulations 2001 (REPPIR) http://www.hse.gov.uk/radiation/ionising/reppir.htm, which includes details of minimising potential doses to the public, as well as assessment and reassurance, linked to other concurrent risks such as flooding. ONR undertakes site-specific assessments of each operators' hazard identification and risk evaluation, which include consideration of whether the public might receive a significant radiation dose in the year following the emergency (excluding countermeasures in the first 24 hours). In defining the areas for off-site emergency planning, practical and strategic factors are then considered, which include other local non-nuclear emergency planning arrangements and experience, and whether local geographic and demographic aspects could aid public credibility and confidence. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  16. Monte Carlo modeling of the MammoSite(Reg) treatments: Dose effects of air pockets

    NASA Astrophysics Data System (ADS)

    Huang, Yu-Huei Jessica

    In the treatment of early-stage breast cancer, MammoSiteRTM has been used as one of the partial breast irradiation techniques after breast-conserving surgery. The MammoSiteRTM applicator is a single catheter with an inflatable balloon at its distal end that can be placed in the resected cavity (tumor bed). The treatment is performed by delivering the Ir-192 high-dose-rate source through the center lumen of the catheter by a remote afterloader while the balloon is inflated in the tumor bed cavity. In the MammoSiteRTM treatment, it has been found that air pockets occasionally exist and can be seen and measured in CT images. Experiences have shown that about 90% of the patients have air pockets when imaged two days after the balloon placement. The criterion for the air pocket volume is less than or equal to 10% of the planning target volume in volume. The purpose of this study is to quantify dose errors occurring at the interface of the air pocket in MammoSiteRTM treatments with Monte Carlo calculations, so that the dosimetric effects from the air pocket can be fully understood. Modern brachytherapy treatment planning systems typically consider patient anatomy as a homogeneous water medium, and incorrectly model lateral and backscatter radiation during treatment delivery. Heterogeneities complicate the problem and may result in overdosage to the tissue located near the medium interface. This becomes a problem in MammoSiteRTM brachytherapy when air pocket appears during the treatment. The resulting percentage dose difference near the air-tissue interface is hypothesized to be greater than 10% when comparing Monte Carlo N-Particle (version 5) with current treatment planning systems. The specific aims for this study are: (1) Validate Monte Carlo N-Particle (Version 5) source modeling. (2) Develop phantom. (3) Calculate phantom doses with Monte Carlo N-Particle (Version 5) and investigate doses difference between thermoluminescent dosimeter measurement, treatment planning system, and Monte Carlo results. (4) Calculate dose differences for various treatment parameters. The results from thermoliminescent dosimeter phantom measurements proves that with correct geometric and source models, Monte Carlo method can be used to estimate homogeneity and heterogeneity doses in MammoSiteRTM treatment. The resulting dose differences at various points of interests in Monte Carlo calculations were presented and compared between different calculation methods. The air pocket doses were found to be underestimated by the treatment planning system. It was concluded that after correcting for inverse square law, the underestimation error from the treatment planning system will be less than +/- 2.0%, and +/- 3.5%, at the air pocket surface and air pocket planning target volume, respectively, when comparing Monte Carlo N-Particle (version 5) results. If the skin surface is located close to the air pocket, the underestimation effect at the air pocket surface and air pocket planning target volume doses becomes less because the air outside of the skin surface reduces the air pocket inhomogeneity effect. In order to maintain appropriate skin dose within tolerance, the skin surface criterion should be considered as the smallest thickness of the breast tissue located between the air pocket and the skin surface. The thickness should be at least 5 mm. In conclusion, the air pocket outside the balloon had less than 10% inhomogeneity effect based on the situations studied. It is recommended that at least an inverse square correction should be taken into consideration in order to relate clinical outcomes to actual delivered doses to the air pocket and surrounding tissues.

  17. Multi-Site Quality Assurance Project Plan for Wisconsin Public Service Corporation, Peoples Gas Light and Coke Company, and North Shore Gas

    EPA Pesticide Factsheets

    This Multi-Site QAPP presents the organization, data quality objectives (DQOs), a set of anticipated activities, sample analysis, data handling and specific Quality Assurance/Quality Control (QA/QC) procedures associated with Studies done in EPA Region 5

  18. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8... redetermination processes via an Internet Web site; and (iii) A system that transmits codes to network pharmacies...— (1) A toll-free customer call center that— (i) Is open during usual business hours. (ii) Provides...

  19. 30 CFR 285.605 - What is a Site Assessment Plan (SAP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Site Assessment Plan (SAP)? 285.605... Assessment Plan (SAP)? (a) A SAP describes the activities (e.g., installation of meteorological towers... project easement, or to test technology devices. (1) Your SAP must describe how you will conduct your...

  20. How Does a Multi-Site Institution Plan Effectively?

    ERIC Educational Resources Information Center

    Jefferson, Curtis F.

    A multi-site college plans effectively by having in place planning and evaluation systems that enhance its capability to respond effectively to changes in the environment in order to continue to provide high quality educational programs and services for the people in its service area. The effectiveness of these systems is dependent on clearly…

  1. SU-E-T-48: A Multi-Institutional Study of Independent Dose Verification for Conventional, SRS and SBRT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Takahashi, R; Kamima, T; Tachibana, H

    2015-06-15

    Purpose: To show the results of a multi-institutional study of the independent dose verification for conventional, Stereotactic radiosurgery and body radiotherapy (SRS and SBRT) plans based on the action level of AAPM TG-114. Methods: This study was performed at 12 institutions in Japan. To eliminate the bias of independent dose verification program (Indp), all of the institutions used the same CT-based independent dose verification software (Simple MU Analysis, Triangle Products, JP) with the Clarkson-based algorithm. Eclipse (AAA, PBC), Pinnacle{sup 3} (Adaptive Convolve) and Xio (Superposition) were used as treatment planning system (TPS). The confidence limits (CL, Mean±2SD) for 18 sitesmore » (head, breast, lung, pelvis, etc.) were evaluated in comparison in dose between the TPS and the Indp. Results: A retrospective analysis of 6352 treatment fields was conducted. The CLs for conventional, SRS and SBRT were 1.0±3.7 %, 2.0±2.5 % and 6.2±4.4 %, respectively. In conventional plans, most of the sites showed within 5 % of TG-114 action level. However, there were the systematic difference (4.0±4.0 % and 2.5±5.8 % for breast and lung, respectively). In SRS plans, our results showed good agreement compared to the action level. In SBRT plans, the discrepancy between the Indp was variable depending on dose calculation algorithms of TPS. Conclusion: The impact of dose calculation algorithms for the TPS and the Indp affects the action level. It is effective to set the site-specific tolerances, especially for the site where inhomogeneous correction can affect dose distribution strongly.« less

  2. Statement by Dr. Raul A. Deju to the Subcommittee on Radioactive Waste, Energy and Utilities Committee, Washington State Senate, Richland, Washington, October 21, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deju, R.A.

    1982-10-01

    The Basalt Waste Isolation Project's mission is to assess whether or not a nuclear waste repository can be sited in the basalts beneath the Hanford Site. Dr. Deju summarizes the results of the siting studies, the activities connected with waste package development, and ongoing engineering studies. In addition, he gives a glimpse of past technical reviews of the project and comments on major technical activities planned in the near future.

  3. Clinical utility of colour flow Doppler ultrasonography in planning anterolateral thigh flap harvest.

    PubMed

    Patel, Rajan S; Higgins, Kevin M; Enepekides, Danny J; Hamilton, Paul A

    2010-10-01

    The anatomic variability of cutaneous perforators contributes to the technical challenges of anterolateral thigh (ALT) free flap harvest. The objective of this study was to assess the accuracy and clinical utility of preoperative colour flow Doppler (CFD) ultrasonography in evaluating planned ALT flap donor sites. A prospective study of the infrainguinal vasculature (profunda femoris and lateral circumflex femoral arteries) in 16 consecutive patients scheduled for ALT free flap transfer for reconstruction of head and neck surgical defects was undertaken. All patients underwent CFD ultrasonography. The location of perforators and the thigh thickness determined by CFD ultrasonography were correlated with the actual intraoperative findings using a scatter plot and paired t-test. Two patients were diagnosed with bilateral silent infrainguinal claudication, which precluded safe use of the ALT donor site. In two other patients, the planned ALT donor site ipsilateral to the defect was not used because of silent infrainguinal claudication diagnosed by CFD ultrasonography. In the 14 patients who underwent ALT flap harvest, CFD ultrasonography identified 48 perforators, which coincided with 43 actual perforators found intraoperatively. CFD ultrasonography demonstrated a statistically significant correlation with the actual perforator locations (Spearman coefficient .76; p = .55). Although CFD ultrasonography tended to underestimate flap thickness, there was a statistically significant correlation (Spearman coefficient .94; p ≤ .0001) with the actual flap thickness. CFD ultrasonography has clinical utility in facilitating decision making and planning ALT flap harvest.

  4. Site Safety Plan for Lawrence Livermore National Laboratory CERCLA investigations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bainer, R.; Duarte, J.

    1993-07-01

    The safety policy of LLNL is to take every reasonable precaution in the performance of work to protect the environment and the health and safety of employees and the public, and to prevent property damage. With respect to hazardous agents, this protection is provided by limiting human exposures, releases to the environment, and contamination of property to levels that are as low as reasonably achievable (ALARA). It is the intent of this Plan to supply the broad outline for completing environmental investigations within ALARA guidelines. It may not be possible to determine actual working conditions in advance of the work;more » therefore, planning must allow the opportunity to provide a range of protection based upon actual working conditions. Requirements will be the least restrictive possible for a given set of circumstances, such that work can be completed in an efficient and timely fashion. Due to the relatively large size of the LLNL Site and the different types of activities underway, site-specific Operational Safety Procedures (OSPs) will be prepared to supplement activities not covered by this Plan. These site-specific OSPs provide the detailed information for each specific activity and act as an addendum to this Plan, which provides the general plan for LLNL Main Site operation.« less

  5. Ecohealth System Dynamic Model as a Planning Tool for the Reduction of Breeding Sites

    NASA Astrophysics Data System (ADS)

    Respati, T.; Raksanagara, A.; Djuhaeni, H.; Sofyan, A.; Shandriasti, A.

    2017-03-01

    Dengue is still one of major health problem in Indonesia. Dengue transmission is influenced by dengue prevention and eradication program, community participation, housing environment and climate. The complexity of the disease coupled with limited resources necessitates different approach for prevention methods that include factors contribute to the transmission. One way to prevent the dengue transmission is by reducing the mosquito’s breeding sites. Four factors suspected to influence breeding sites are dengue prevention and eradication program, community participation, housing environment, and weather condition. In order to have an effective program in reducing the breeding site it is needed to have a model which can predict existence of the breeding sites while the four factors under study are controlled. The objective of this study is to develop an Ecohealth model using system dynamic as a planning tool for the reduction of breeding sites to prevent dengue transmission with regard to dengue prevention and eradication program, community participation, housing environment, and weather condition. The methodology is a mixed method study using sequential exploratory design. The study comprised of 3 stages: first a qualitative study to 14 respondents using in-depth interview and 6 respondents for focus group discussion. The results from the first stage was used to develop entomology and household survey questionnaires for second stage conducted in 2036 households across 12 sub districts in Bandung City. Ecohealth system dynamic model was developed using data from first and second stages. Analyses used are thematic analysis for qualitative data; spatial, generalized estimating equation (GEE) and structural equation modeling for quantitative data; also average mean error (AME) and average variance error (AVE) for dynamic system model validation. System dynamic model showed that the most effective approach to eliminate breeding places was by ensuring the availability of basic sanitation for all houses. Weather factors such as precipitation can be compensated with the eradication of breeding sites activities which is conducted as scheduled and at the same time for the whole areas. Conclusion of this study is that dengue prevention and eradication program, community participation, and housing environment contributed to breeding places elimination influenced the existence of the breeding sites. The availability of basic sanitation and breeding places eradication program done timely and collectively are the most effective approach to eradicate breeding sites. Ecohealth dynamic system model can be used as a tool for the planning of breeding sites eradication program to prevent disease transmissions at city level.

  6. Transportation planning effectiveness: twenty case studies

    DOT National Transportation Integrated Search

    1977-12-31

    This document consists of 20 site-specific case studies of urban area experience with the Technical Study Grant Program of the Urban Mass Transportation Administration (UMTA). The objective of the case studies is to determine how the Technical Study ...

  7. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  8. 78 FR 46925 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... Commercial Dock Development Study A. Contract and Project Status B. Overview of draft Dock Development Plan.... Land-side support facilities a. Outer Cove Mariana b. Puerto Rico Dump c. Echo Dock d. Sea Plan Ramp iv. Environmental Consideration and Permits v. Discussion on Preferred Site Location C. Evaluation of Preliminary...

  9. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  10. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  11. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  12. 14 CFR 431.25 - Application requirements for policy review.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... site(s), including planned contingency abort locations, if any; (2) Flight trajectories, reentry... abort profiles, if any; (3) Sequence of planned events or maneuvers during the mission; and for an...

  13. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  14. Wilderness and backcountry site restoration guide

    Treesearch

    Lisa Therrell; David Cole; Victor Claassen; Chris Ryan; Mary Ann Davies

    2006-01-01

    This comprehensive guide focuses on restoration of small-scale impact caused by human actions in wilderness and backcountry areas. The guide's goals are to: 1) Help practitioners develop plans that thoroughly address the question of whether site restoration is the best management action and, if so, develop a site-specific restoration plan that incorporates...

  15. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  16. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 6 Domestic Security 1 2011-01-01 2011-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  17. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  18. 6 CFR 27.245 - Review and approval of site security plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 6 Domestic Security 1 2013-01-01 2013-01-01 false Review and approval of site security plans. 27.245 Section 27.245 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.245 Review and approval of site...

  19. The Epistemography of an Urban and Regional Planning Practicum: Appropriation in the Face of Resistance. WCER Working Paper No. 2010-8

    ERIC Educational Resources Information Center

    Bagley, Elizabeth

    2010-01-01

    In this paper, the author describes an ethnographic study of a graduate-level practicum at a large Midwestern university in order to examine one of the ways urban planners develop expertise. The graduate students in the practicum were guided in the production of a site plan for a developing area by a planner with 34 years of planning experience.…

  20. SEACIONS During the 2012 Asian Monsoon: A Strategic Approach to Determining Convective Impacts on Tropospheric Ozone and TTL Gravity Waves

    NASA Technical Reports Server (NTRS)

    Thompson, Anne M. (Principal Investigator); Young, George S. (Principal Investigator); Morris, Gary; Johnson, Bryan; Oltmans, Samuel; Selkirk, Henry B.

    2016-01-01

    Purpose of making ozone and water vapor profiles measurements in SEAC4RS is to give consistent coverage of the vertical structure at fixed sites to (1) complement 2 campaign aircraft sampling; (2) ground-truth satellite measurements of H O and ozone; (3) provide profiles for model evaluation; (4) study processes responsible for day-to-day variability at each site. Revised objective for 2013, due to cancellation of the 2012 and 2013 plans to operate in Southeast Asia: rapidly re-configure the original "SEACIONS," Southeast Asian Consortium for Intensive Ozonesonde Network Study, to a SouthEast American plan (SEACIONS) for collecting daily ozonesonde data during DC-8 and ER-2 flights throughout the southeastern US. As in previous IONS (2004, 2006, 2008), students were trained at St Louis, Tallahassee, Houston, Penn State, Huntsville, Socorro. Images of the soundings and related flight-planning products were posted each day at NASA and Penn State (PSU) websites. With the aircraft based at Ellington Field (Houston), water CFH (cryogenic frost-point hygrometer) sondes in addition to ozonesondes, were to be taken launched at that site.

  1. Tailoring family planning services to the special needs of adolescents.

    PubMed

    Winter, L; Breckenmaker, L C

    1991-01-01

    Experimental service protocols tailored to the needs of teenage family planning patients were developed that emphasized indepth counseling, education geared to an adolescent's level of development, and the provision of reassurance and social support. These protocols were tested against usual service delivery practices in a study involving 1,261 patients under 18 years of age at six nonmetropolitan family planning clinics. A comparison with teenagers obtaining services at control sites found that six months after their first clinic visit, patients at the experimental sites were more likely to be using a method, were less likely to experience difficulty in dealing with problems, were more likely to continue using their method despite problems and had learned more during the educational session. Teenage patients at the experimental clinics were also less likely to have become pregnant within one year than those who went to control clinics. Attrition during the year following the first study visit was similar among both groups; patient satisfaction was very high, and equivalent at experimental and control sites. The data show that the extra time and effort required to meet the special needs of teenagers is justified by their improved contraceptive use, greater knowledge and lower pregnancy rates.

  2. Superfund record of decision (EPA Region 3): Ohio River Park Site, Operable Unit 3, Neville Island, PA, September 17, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    This Record of Decision (ROD) presents the selected remedial action plan for the Ohio River Park Superfund Site (the Site) in Allegheny County, Pennsylvania. The remedial action plan in this document is presented as the permanent remedy for controlling the groundwater at the Site. This remedy is comprised of: monitoring of natural attenuation processes to measure changes in contaminant concentrations in groundwater plume at the Site until the cleanup levels are achieved; deed restriction preventing residential use of groundwater at the Site.

  3. Fifteen-foot diameter modular space station Kennedy Space Center launch site support definition (space station program Phase B extension definition)

    NASA Technical Reports Server (NTRS)

    Bjorn, L. C.; Martin, M. L.; Murphy, C. W.; Niebla, J. F., V

    1971-01-01

    This document defines the facilities, equipment, and operational plans required to support the MSS Program at KSC. Included is an analysis of KSC operations, a definition of flow plans, facility utilization and modifications, test plans and concepts, activation, and tradeoff studies. Existing GSE and facilities that have a potential utilization are identified, and new items are defined where possible. The study concludes that the existing facilities are suitable for use in the space station program without major modification from the Saturn-Apollo configuration.

  4. Treatment planning and delivery of involved field radiotherapy in advanced Hodgkin's disease: results from a questionnaire-based audit for the UK Stanford V regimen vs ABVD clinical trial quality assurance programme (ISRCTN 64141244).

    PubMed

    Diez, P; Hoskin, P J; Aird, E G A

    2007-10-01

    This questionnaire forms the basis of the quality assurance (QA) programme for the UK randomized Phase III study of the Stanford V regimen versus ABVD for treatment of advanced Hodgkin's disease to assess differences between participating centres in treatment planning and delivery of involved-field radiotherapy for Hodgkin's lymphoma The questionnaire, which was circulated amongst 42 participating centres, consisted of seven sections: target volume definition and dose prescription; critical structures; patient positioning and irradiation techniques; planning; dose calculation; verification; and future developments The results are based on 25 responses. One-third plan using CT alone, one-third use solely the simulator and the rest individualize, depending on disease site. Eleven centres determine a dose distribution for each patient. Technique depends on disease site and whether CT or simulator planning is employed. Most departments apply isocentric techniques and use immobilization and customized shielding. In vivo dosimetry is performed in 7 centres and treatment verification occurs in 24 hospitals. In conclusion, the planning and delivery of treatment for lymphoma patients varies across the country. Conventional planning is still widespread but most centres are moving to CT-based planning and virtual simulation with extended use of immobilization, customized shielding and compensation.

  5. SU-F-T-231: Improving the Efficiency of a Radiotherapy Peer-Review System for Quality Assurance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hsu, S; Basavatia, A; Garg, M

    Purpose: To improve the efficiency of a radiotherapy peer-review system using a commercially available software application for plan quality evaluation and documentation. Methods: A commercial application, FullAccess (Radialogica LLC, Version 1.4.4), was implemented in a Citrix platform for peer-review process and patient documentation. This application can display images, isodose lines, and dose-volume histograms and create plan reports for peer-review process. Dose metrics in the report can also be benchmarked for plan quality evaluation. Site-specific templates were generated based on departmental treatment planning policies and procedures for each disease site, which generally follow RTOG protocols as well as published prospective clinicalmore » trial data, including both conventional fractionation and hypo-fractionation schema. Once a plan is ready for review, the planner exports the plan to FullAccess, applies the site-specific template, and presents the report for plan review. The plan is still reviewed in the treatment planning system, as that is the legal record. Upon physician’s approval of a plan, the plan is packaged for peer review with the plan report and dose metrics are saved to the database. Results: The reports show dose metrics of PTVs and critical organs for the plans and also indicate whether or not the metrics are within tolerance. Graphical results with green, yellow, and red lights are displayed of whether planning objectives have been met. In addition, benchmarking statistics are collected to see where the current plan falls compared to all historical plans on each metric. All physicians in peer review can easily verify constraints by these reports. Conclusion: We have demonstrated the improvement in a radiotherapy peer-review system, which allows physicians to easily verify planning constraints for different disease sites and fractionation schema, allows for standardization in the clinic to ensure that departmental policies are maintained, and builds a comprehensive database for potential clinical outcome evaluation.« less

  6. The NOAA Integrated Surface Irradiance Study (ISIS)-A New Surface Radiation Monitoring Program.

    NASA Astrophysics Data System (ADS)

    Hicks, B. B.; Deluisi, J. J.; Matt, D. R.

    1996-12-01

    This paper describes a new radiation monitoring program, the Integrated Surface Irradiance Study (ISIS), that builds upon and takes over from earlier NOAA networks monitoring components of solar radiation [both the visible component (SOLRAD) and the shortwave component that causes sunburn, UV-B] across the continental United States. ISIS is implemented in two levels. Level 1 addresses incoming radiation only, and level 2 addresses the surface radiation balance. Level 2 also constitutes the SURFRAD (Surface Radiation) program of the NOAA Office of Global Programs, specifically intended to provide radiation data to support large-scale hydrologic studies that will be conducted under the Global Energy and Water Cycle Experiment. Eventually, it is planned for level 2 sites to monitor all components of the surface energy balance. Both levels of ISIS will eventually measure both visible and UV radiation components. At present, there are nine sites that are considered to be at ISIS level 1 standard and an additional four level 2 SURFRAD sites. A 10th level 1 site will be in operation soon. Plans call for an increase in the number of sites of both kinds, up to about 15 ISIS sites, of which 6 will be at the SURFRAD level. Data are available via FTP at ftp.atdd.noaa.govlpublisis or at http://www.srrb.noaa.gov (level 2).

  7. 14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1120. Specifications ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. "SITE WORK, CIVIL, SITE PLAN." Test Area 1-120. Specifications No. OC2-55-72; Drawing No. 60-09-12; sheet 7 of 148; file no. 1320/58, Rev. C. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338 Rev. C, Date: 16 April 1957. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  8. China SLAT Plan Template

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dietrich, Richard E.

    2016-07-01

    This document serves as the System-Level Acceptance Test (SLAT) Plan for Site Name, City, Country. This test plan is to provide independent testing of the Radiation Detection System (RDS) installed at Site Name to verify that Customs has been delivered a fully-functioning system as required by all contractual commitments. The system includes all installed hardware and software components. The SLAT plan will verify that separate components are working individually and collectively from a system perspective.

  9. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    2007-09-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less

  10. An approach for recreation suitability analysis to recreation planning in Gölcük Nature Park.

    PubMed

    Gül, Atila; Orücü, M Kamil; Karaca, Oznur

    2006-05-01

    Gölcük Nature Park (GNP) is an area protected by law in Turkey. It is an important nature park with rich flora, fauna, geomorphologic forms, landscape features, and recreational potential in the region. However, GNP does not have a recreation management plan. The purpose of this study was to determine the actual natural, cultural, and visual resources of GNP, determine the most suitable recreational sites with multiple factors, evaluate the demands and tendencies of visitors, and suggest recreational activities and facilities for the most suitable sites of GNP. However, it was also conceived as leading to a recreational plan and design of GNP in the future and identifying the entire appropriate and current data of GNP with the creation of various maps. This study used multifactor analysis to determine the most suitable recreation sites of GNP. Used recreation factors were established including degree of slope, proximity to water resources, accessibility, elevation, vegetation, soil, climate, aspect, current cultural facilities, visual values, and some limiting factors in accordance with the characteristics of GNP. Weighting and suitability values of factors were determined by 30 local expert surveys. All obtained data were evaluated and integrated in the Geographical Information Systems base. Obtained maps were overlapped. Thus, recreational suitability zones map were created manually. However, the demands and behaviours from visitor surveys in GNP were focused on the most suitable recreation sites of the park. Finally, 10% of GNP was identified as the most suitable sites for recreational use. Various recreational facilities and activities (including picnicking, sports facilities and playgrounds, camping sites, walking paths, food and local outlets, etc.) were recommended for nine of the most suitable areas on the proposed recreational map.

  11. A groundwater management plan for Stuttgart.

    PubMed

    Vasin, Sandra; Carle, Achim; Lang, Ulrich; Kirchholtes, Hermann Josef

    2016-09-01

    In general, groundwater in urban areas is exposed to anthropogenic influence and suffers from concentrations of contaminants. Stuttgart, as a highly industrialized city, has more than 5000 contaminated sites which might influence the Stuttgart's mineral water quality. Despite tremendous efforts and intensive single site orientated remediation since 1984 in downtown, the mineral springs were still affected with chlorinated hydrocarbons at low concentrations. Therefore, the applied practices of environmental management and measures for mitigation of pollution sources were not sufficient and had to be adjusted. The main goal of this study is to define an integral remediation plan (a groundwater management plan), focusing on the key sources of chlorinated solvents which are relevant for the mineral springs. For the large-scale investigated area of 26.6km(2) and eight aquifers, an extensive investigation and characterization methods were used in order to delineate the contamination plumes. By means of a 3D numerical model, the prioritization of the contaminated sites could be performed. Five contaminated sites with high remediation priority and need for optimized or additional remediation efforts were determined. For those five contaminated sites feasibility studies were performed which resulted in recommendation of remediation measures with total costs of more than 12.5 million euros. The proposed strategy and approach are suitable for multiple sources of contamination. Only in this way, the contributions of single contaminated sites to the total groundwater contamination can be identified and local remediation measures with their spatial impact simulated. Due to very complex geological conditions, technically there is no alternative to this strategy in order to achieve the contamination reduction in groundwater. Copyright © 2015 Elsevier B.V. All rights reserved.

  12. Idaho National Laboratory Site Pollution Prevention Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less

  13. Strategic plan for Hanford site information management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site`s decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandatesmore » of DOE.« less

  14. A Cultural Resource and Geological Study Pertaining to Four Selected Petroglyph/Pictograph Sites on Nellis Air Force Range and Adjacent Overflight Lands, Lincoln and Nye Countries, Nevada

    DTIC Science & Technology

    1999-08-01

    petroglyph elements from this site were included in Heizer and Baumhoff s (1962:57) classic analysis. Unfortunately, the two researchers equate Steward’s...mining camp 2 to 3 miles southwest of this site. Heizer and Baumhoff additionally apply the site number of NY-3 to this site in their work, when actually...26NY3 is recorded as 38 0 Wagon Parts . Map 6. Civet Cat Canyon (26NY369) Site Plan. 39 * Contours not to scale - rendered for relief. ■T-.IKI

  15. Remote Sensor Application Studies Progress Report, July L, 1968 to June 30, 1969. Controlled Field Experiments

    USGS Publications Warehouse

    Rowan, L.C.; Offield, T.W.; Watson, R.D.; Cannon, P.J.; Grolier, H.J.; Pohn, H.A.; Watson, Kenneth

    1970-01-01

    Field Sites have been selected for controlled experiments to analyze physical and chemical parameters affecting the response of electromagnetic radiation to geological materials. Considerations in the selection of the sites are the availability of good exposures of nearly monomineralic rocks, level of geologic understanding, and ease of access. Seven sites, where work is underway or planned, contain extensive outcrops of the following rocks: stanstone, limestone, dolomite, and gypsum. Field measurement of quartz have been conducted at four sites.

  16. MX Siting Investigation. Mineral Resources Survey, Seven Additional Valleys, Nevada/Utah Siting Area. Volume I.

    DTIC Science & Technology

    1981-06-23

    Some negative impacts of MX deployment on mining in the study area are unavoidable, but careful planning in water use and actual shelter site...depend upon the extent of deployment and location of shelter sites. A major impact on the mining industry will result if draw-down of the water table...use and acquire the necessary land rights or whether the affected shelter (s) should be abandoned or replaced elsewhere in the deployment area. Egec E-TR

  17. Exploring quality standards for New River Gorge climbing sites: establishing a baseline for the future

    Treesearch

    Roy Ramthun; Andy Blake

    2003-01-01

    The New River Gorge National River has become a major destination for sport climbers in the eastern U.S. A new climbing management plan is being developed for the site. This study examined the satisfaction levels of climbers with some of the easily managed facilities at climbing sites and looked at attributes of the social setting preferred by climbers. Climbers at the...

  18. Community-level effect of the reproductive health vouchers program on out-of-pocket spending on family planning and safe motherhood services in Kenya.

    PubMed

    Obare, Francis; Warren, Charlotte; Kanya, Lucy; Abuya, Timothy; Bellows, Ben

    2015-08-25

    Although vouchers can protect individuals in low-income countries from financial catastrophe and impoverishment arising from out-of-pocket expenditures on healthcare, their effectiveness in achieving this goal depends on whether both service and transport costs are subsidized as well as other factors such as service availability in a given locality and community perceptions about the quality of care. This paper examines the community-level effect of the reproductive health vouchers program on out-of-pocket expenditure on family planning, antenatal, delivery and postnatal care services in Kenya. Data are from two rounds of cross-sectional household surveys in voucher and non-voucher sites. The first survey was conducted between May 2010 and July 2011 among 2,933 women aged 15-49 years while the second survey took place between July and October 2012 among 3,094 women of similar age groups. The effect of the program on out-of-pocket expenditure is determined by difference-in-differences estimation. Analysis entails comparison of changes in proportions, means and medians as well as estimation of multivariate linear regression models with interaction terms between indicators for study site (voucher or non-voucher) and period of study (2010-2011 or 2012). There were significantly greater declines in the proportions of women from voucher sites that paid for antenatal, delivery and postnatal care services at health facilities compared to those from non-voucher sites. The changes were also consistent with increased uptake of the safe motherhood voucher in intervention sites over time. There was, however, no significant difference in changes in the proportions of women from voucher and non-voucher sites that paid for family planning services. The results further show that there were significant differences in changes in the amount paid for family planning and antenatal care services by women from voucher compared to those from non-voucher sites. Although there were greater declines in the average amount paid for delivery and postnatal care services by women from voucher compared to those from non-voucher sites, the difference-in-differences estimates were not statistically significant. The reproductive health vouchers program in Kenya significantly contributed to reductions in the proportions of women in the community that paid out-of-pocket for safe motherhood services at health facilities.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giaddui, T; Hardin, M; Keller, J

    Purpose: To evaluate patient specific quality assurance (PSQA) for the delivery of volumetric modulated arc therapy (VMAT) by disease site. To compare planning-delivery system (PDS) PSQA pass rates in a dual vendor institution. Methods: PSQA is performed for VMAT plans using a ScandiDos Delta4 phantom. Verification plans are calculated using Varian Eclipse and Elekta Monaco treatment planning systems (TPS) for patients treated using Varian Truebeam and Elekta linear accelerators respectively. Individual arcs are delivered to the Delta4 phantoms and assessed using the gamma index pass criterion(3% Dose Deviation(DD%), 3mm Distance to Agreement(DTA),10% dose threshold and 90% gamma index). Results: Amore » total of 287 VMAT plans and 680 arcs were analyzed. The passing rates for VMAT QA plans were 95% and 98% for head/neck and pelvis/prostate plans respectively, and 100% for chest/abdomen, spine, lung Stereotactic Body Radiotherapy (SBRT) and Stereotactic Radiosurgery(SRS) plans. Average gamma indices were: (99 ± 2) % for pelvis/prostate, chest/abdomen and lung SBRT plans, (97 ± 4) % for head and neck plans and (98 ± 3) % for spine plans. The average DD% and DTA pass rates ranged from 82% to 90% and 98% to 99% respectively for plans in different disease sites. Paired t-test analysis (two tails) indicated no significant differences in the gamma indices between plans delivered using different PDS; the P values were: 0.08, 0.45, and 0.94 for lung SBRT, head/neck and pelvis/prostate plans respectively. The statistical power for comparing PDS in different disease sites with an alpha of 0.05 is 1. Conclusion: The Gamma indices based on 3% DD%, 3 mm DTA and 10% dose threshold for the VMAT QA plans in all disease sites were well above 90%, suggesting the possibility of using a more stringent PSQA criterion. No significant differences were observed in the QA of VMAT plans delivered using different PDS.« less

  20. Draft Site Treatment Plan (DSTP), Volumes I and II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D`Amelio, J.

    1994-08-30

    Site Treatment Plans (STP) are required for facilities at which the DOE generates or stores mixed waste. This Draft Site Treatment Plan (DSTP) the second step in a three-phase process, identifies the currently preferred options for treating mixed waste at the Savannah River Site (SRS) or for developing treatment technologies where technologies do not exist or need modification. The DSTP reflects site-specific preferred options, developed with the state`s input and based on existing available information. To the extent possible, the DSTP identifies specific treatment facilities for treating the mixed waste and proposes schedules. Where the selection of specific treatment facilitiesmore » is not possible, schedules for alternative activities such as waste characterization and technology assessment are provided. All schedule and cost information presented is preliminary and is subject to change. The DSTP is comprised of two volumes: this Compliance Plan Volume and the Background Volume. This Compliance Plan Volume proposes overall schedules with target dates for achieving compliance with the land disposal restrictions (LDR) of RCRA and procedures for converting the target dates into milestones to be enforced under the Order. The more detailed discussion of the options contained in the Background Volume is provided for informational purposes only.« less

  1. 17. TOP 3/1. Site plan of the woodward pumping station. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. TOP 3/1. Site plan of the woodward pumping station. - Wyoming Valley Flood Control System, Woodward Pumping Station, East of Toby Creek crossing by Erie-Lackawanna Railroad, Edwardsville, Luzerne County, PA

  2. Site plan, map, and statement of significance Promontory Route ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site plan, map, and statement of significance - Promontory Route Railroad Trestles, S.P. Trestle 779.91, One mile southwest of junction of State Highway 83 and Blue Creek, Corinne, Box Elder County, UT

  3. Community Involvement Plan for Northeast Church Rock and Kerr-McGee Quivira Mine Sites

    EPA Pesticide Factsheets

    This Community Involvement Plan outlines opportunities for individual participation and meaningful information sharing regarding EPA’s activities in communities near Northeast Churchrock and Kerr-McGee Quivira Mine Sites.

  4. Site Plan: Real Estate, Custer Reserve Forces Training Area, Military ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Site Plan: Real Estate, Custer Reserve Forces Training Area, Military Reservation, USACOE, 20 July 1948 - Fort Custer Military Reservation, Bounded by Territorial, Dickman, & Longman Roads & Route 94 Business, Battle Creek, Calhoun County, MI

  5. CHARACTERIZATION REPORT FOR STRONTIUM TITANATE IN SWSA 7 AND ADJACENT PARCELS IN SUPPORT OF THE NATIONAL PRIORITIES LIST SITE BOUNDARY DEFINITION PROGRAM OAK RIDGE, TENNESSEE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David A. King

    2011-10-10

    The U.S. Department of Energy (DOE) Oak Ridge Office requested support from the Oak Ridge Institute for Science and Education (ORISE) contract to delineate the extent of strontium titanate (SrTiO3) contamination in and around Solid Waste Storage Area (SWSA) 7 as part of the Oak Ridge National Priorities List Site boundary definition program. The study area is presented in Fig. 1.1 relative to the Oak Ridge Reservation (ORR). The investigation was executed according to Sampling and Analysis Plan/Quality Assurance Project Plan (SAP/QAPP) (DOE 2011) to supplement previous investigations noted below and to determine what areas, if any, have been adverselymore » impacted by site operations.« less

  6. Negotiating the COAPRT Learning Outcomes Transition Using Quality Management Tools: A Case Study of the COAPRT Beta Test Site

    ERIC Educational Resources Information Center

    Ellis, Gary D.

    2014-01-01

    This paper is a case study. It tells the story of the process that the Council on Accreditation for Parks, Recreation, Tourism and Related Professions beta test site created its learning outcomes assessment program. A planning process was used that has evolved from quality management philosophy and practice: DMADV. Use of DMADV required precise…

  7. Generalizing ecological site concepts of the Colorado Plateau for landscape-level applications

    USGS Publications Warehouse

    Duniway, Michael C.; Nauman, Travis; Johanson, Jamin K.; Green, Shane; Miller, Mark E.; Bestelmeyer, Brandon T.

    2016-01-01

    Numerous ecological site descriptions in the southern Utah portion of the Colorado Plateau can be difficult to navigate, so we held a workshop aimed at adding value and functionality to the current ecological site system.We created new groups of ecological sites and drafted state-and-transition models for these new groups.We were able to distill the current large number of ecological sites in the study area (ca. 150) into eight ecological site groups that capture important variability in ecosystem dynamics.Several inventory and monitoring programs and landscape scale planning actions will likely benefit from more generalized ecological site group concepts.

  8. Sustainable Community Case Study: An Assessment of EPA’s Sustainable Development Plan for Stella, Missouri

    EPA Science Inventory

    In 2006, citizens of Stella, Missouri asked the EPA for technical assistance in demolition and site remediation of an abandoned hospital; and how to redevelop the site to help the community be more sustainable. EPA Region 7 teamed with EPA Office of Research and Development (ORD...

  9. 10 CFR 765.30 - Reimbursement of costs incurred in accordance with a plan for subsequent remedial action.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... COSTS OF REMEDIAL ACTION AT ACTIVE URANIUM AND THORIUM PROCESSING SITES Additional Reimbursement... satisfied in full by the licensee, and (2) The total cost of remedial action required at the site, together... at the site, as determined in the approved plan for subsequent remedial action, by the Federal...

  10. 14 CFR 259.6 - Notice and contract of carriage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Web site shall post its Contract of Carriage on its Web site in easily accessible form, including all... Lengthy Tarmac Delays shall, if it has a Web site but does not include such Contingency Plan for Lengthy Tarmac Delays in its Contract of Carriage, post its Contingency Plan for Lengthy Tarmac Delays on its Web...

  11. 76 FR 5611 - Notice of Availability of the Environmental Assessment for the Short Term Sentences Acquisition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... action alternatives and the No Action Alternative. Natural, cultural, and socioeconomic resource impacts.... Cohn, Chief, or Issac J. Gaston, Site Selection Specialist, Capacity Planning and Site Selection Branch..., Capacity Planning and Site Selection Branch. [FR Doc. 2011-1817 Filed 1-31-11; 8:45 am] BILLING CODE P ...

  12. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  13. Site Planning: Auraria Higher Education Center.

    ERIC Educational Resources Information Center

    Auraria Higher Education Center, Denver, CO.

    This book presents the site master plan for the Auraria Higher Education Center, which is dedicated to the offering of an urban-oriented program in higher education and is made up of three institutions -- the Denver Center of the University of Colorado, Metropolitan State College, and the Community College of Denver located on a single site in the…

  14. 14 CFR 259.6 - Notice and Contract of Carriage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Web site shall post its Contract of Carriage on its Web site in easily accessible form, including all... Lengthy Tarmac Delays shall, if it has a Web site but does not include such Contingency Plan for Lengthy Tarmac Delays in its Contract of Carriage, post its Contingency Plan for Lengthy Tarmac Delays on its Web...

  15. Implementation of Policy, Systems, and Environmental Community-Based Interventions for Cardiovascular Health Through a National Not-for-Profit: A Multiple Case Study.

    PubMed

    Garney, Whitney R; Szucs, Leigh E; Primm, Kristin; King Hahn, Laura; Garcia, Kristen M; Martin, Emily; McLeroy, Kenneth

    2018-05-01

    In 2014, the Centers for Disease Control and Prevention funded the American Heart Association to implement policy, systems, and environment-focused strategies targeting access to healthy food and beverages, physical activity, and smoke-free environments. To understand factors affecting implementation and variations in success across sites, evaluators conducted a multiple case study. Based on past literature, community sites were categorized as capacity-building or implementation-ready, for comparison. A sample of six communities were selected using a systematic selection tool. Through site visits, evaluators conducted interviews with program staff and community partners and assessed action plans. Evaluators identified important implications for nationally coordinated community-based prevention programming. Differences in implementation varied by the communities' readiness, with the most notable differences in how they planned activities and defined success. Existing partner relationships (or lack thereof) played a significant role, regardless of the American Heart Association's existing presence within the communities, in the progression of initiatives and the differences observed among phases. Last, goals in capacity-building sites were tied to organizational goals while goals in implementation-ready sites were more incremental with increased community influence and buy-in. Using national organizations as a mechanism to carry out large-scale community-based prevention work is a viable option that provides coordinated, wide-scale implementation without sacrificing a community's priorities or input. In funding future initiatives, the presence of relationships and the time needed to cultivate such relationships should be accounted for in the planning and implementation processes, as well as both local and national expectations.

  16. Proposed plan for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-08-10

    This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant areamore » and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.« less

  17. Collaborating for care: initial experience of embedded case managers across five medical homes.

    PubMed

    Treadwell, Janet; Giardino, Angelo

    2014-01-01

    The purpose of this intervention was to answer the following question: Does an embedded nurse case manager from a health plan performing embedded care coordination and supporting a quality improvement project impact medical home service use, role satisfaction, and per member per month expense? The setting for this study was primary care medical home practices with a minimum of 1,000 lives, contracted with a health plan delivering Medicaid and Children's Health Insurance coverage. Five medical home practice sites were selected for the intervention. The study began with case manager training and project permission in 5 medical homes, followed by implementation of care coordination with health plan clients. The nurse case manager performed care coordination functions for clients and initiated a Lean Six Sigma quality improvement project at the medical home site. The analysis strategy was to compare each medical home with itself before and after the intervention, as well as to obtain satisfaction information from medical home staff and care coordinators. Reductions in expense, as demonstrated by decreased per member per month claim cost, admissions per thousand, and reduced variation in days per thousand, were documented. Quality projects attained significant improvements in 4 out of 5 sites, and practice staff as well as case managers described satisfaction with the embedded nurse case manager role. These findings support medical homes as being an effective delivery model of the Affordable Care Act. Case managers who practice in primary care sites can make a significant difference in patient outcomes and practice efficiencies. Embedded case managers have the ability to impact the population being served through modeling and supporting interprofessional relationships and case management expertise. Use of motivational interviewing, assessment skills, advocacy, and joint care planning engage patients in their own care, whereas quality initiatives bring efficiencies and effectiveness to overall operations. There is need for research to be conducted across a larger number of practice sites and diverse populations to substantiate the effect of embedded case management in medical home.

  18. Cape Blanco Wind Farm Feasibility Study : Technical Report, No. 2, Civil Engineering.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration.

    1986-09-01

    An investigation of the feasibility of developing a wind farm near Cape Blanco, Oregon, requires a plan for civil engineering and preliminary site construction activities. In this report, plans for such activities and related cost estimates are presented for a wind farm using either a Boeing MOD-2 or FloWind 170 wind turbine generator.

  19. Site-Based Management in Education: Rochester City School District Case Study.

    ERIC Educational Resources Information Center

    Gross, Alan

    This paper describes outcomes of a partnership between the Rochester City School District (New York) and the Kodak 21st Century Learning Challenge consulting program for improving school-based planning team (S-BPT) operations. The purpose of the school-based planning team is to involve the entire school community in improving school effectiveness.…

  20. HIGH RISE OR LOW RISE. A STUDY OF DECISION FACTORS IN RESIDENCE HALLS PLANNING.

    ERIC Educational Resources Information Center

    Educational Facilities Labs., Inc., New York, NY.

    THE PURPOSE OF THIS REPORT IS TO SERVE COLLEGE OFFICIALS, HOUSING ADMINISTRATORS, PLANNING GROUPS AND ARCHITECTS BY FOCUSING ON THE DECISION FACTORS WHICH RELATE TO HIGH-RISE AND LOW-RISE STUDENT HOUSING. DECISION FACTORS INCLUDE--(1) LAND USE IMPLICATIONS, (2) SITE REQUIREMENTS--BUILDING CODES, SUB-SOIL CONSIDERATIONS, NATURAL TERRAIN,…

  1. Language Planning and Policy in a School Site: A Diachronic Analysis

    ERIC Educational Resources Information Center

    Kemp, Shaun

    2017-01-01

    This article engages with diachronic analysis, an analysis of changes over time, as it relates to the field of language planning and policy (LPP) through a case study of a local language problem: the introduction of Chinese language into an established government school over a 10-year period. Using cultural-historical activity theory, expanding…

  2. 70. Photograph of line drawing. TOPOGRAPHIC SITE PLAN OF 500,000 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    70. Photograph of line drawing. TOPOGRAPHIC SITE PLAN OF 500,000 POUND STATIC TEST FACILITY, APRIL 1947 - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  3. Floor Plan, Axonometric View, Site Location Key, Cesar Chavez Fasting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Floor Plan, Axonometric View, Site Location Key, Cesar Chavez Fasting Room Diagram - Forty Acres, Tomasa Zapata Mireles Co-op Building , 30168 Garces Highway (Northwest Corner of Garces Highway and Mettler Avenue), Delano, Kern County, CA

  4. 20. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of an as-constructed site plan for additions to North Base: Job No. A(8-1), Military Construction, Materiel Command Flight Test Base, Muroc, California; Additional Construction, Location Plan, Sheet No. 2, October 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  5. Ecological planning proposal for Kruger National Park

    NASA Astrophysics Data System (ADS)

    van Riet, W. F.; Cooks, J.

    1990-05-01

    This article discusses an application of the ecological planning model proposed by Van Riet and Cooks. The various steps outlined in this model have been applied to Kruger National Park in South Africa. The natural features of Kruger National Park, which form the basis of such an ecological planning exercise and from which the various land use categories, values, and zoning classes can be determined, are discussed in detail. The suitability of each of the various features is analyzed and a final zoning proposal for Kruger National Park is suggested. Furthermore a method for selecting a site for a new camp is illustrated by referring to the site for the new Mopane rest camp which is now under construction in the Kruger National Park. The conclusion is reached that the proposed ecological planning model can be used successfully in planning conservation areas such as Kruger National Park and for the selection of the most desirable sites for the establishment of new rest camps. Its suitability as a practical model in such planning exercises is proven by the fact that the siting proposals of two new camps based on this model have been accepted by the National Parks Board, the controlling body of Kruger National Park.

  6. Group versus individual family planning counseling in Ghana: a randomized, noninferiority trial.

    PubMed

    Schwandt, Hilary M; Creanga, Andreea A; Danso, Kwabena A; Adanu, Richard M K; Agbenyega, Tsiri; Hindin, Michelle J

    2013-08-01

    Group, rather than individual, family planning counseling has the potential to increase family planning knowledge and use through more efficient use of limited human resources. A randomized, noninferiority study design was utilized to identify whether group family planning counseling is as effective as individual family planning counseling in Ghana. Female gynecology patients were enrolled from two teaching hospitals in Ghana in June and July 2008. Patients were randomized to receive either group or individual family planning counseling. The primary outcome in this study was change in modern contraceptive method knowledge. Changes in family planning use intention before and after the intervention and intended method type were also explored. Comparisons between the two study arms suggest that randomization was successful. The difference in change in modern contraceptive methods known from baseline to follow-up between the two study arms (group-individual), adjusted for study site, was -0.21, (95% confidence interval: -0.53 to 0.12) suggesting no difference between the two arms. Group family planning counseling was as effective as individual family planning counseling in increasing modern contraceptive knowledge among female gynecology patients in Ghana. Copyright © 2013 Elsevier Inc. All rights reserved.

  7. Between Site Reliability of Startle Prepulse Inhibition Across Two Early Psychosis Consortia

    PubMed Central

    Addington, Jean; Cannon, Tyrone D.; Cornblatt, Barbara A.; de la Fuente-Sandoval, Camilo; Mathalon, Dan H.; Perkins, Diana O.; Seidman, Larry J.; Tsuang, Ming; Walker, Elaine F.; Woods, Scott W.; Bachman, Peter; Belger, Ayse; Carrión, Ricardo E.; Donkers, Franc C.L.; Duncan, Erica; Johannesen, Jason; León-Ortiz, Pablo; Light, Gregory; Mondragón, Alejandra; Niznikiewicz, Margaret; Nunag, Jason; Roach, Brian J.; Solís-Vivanco, Rodolfo

    2014-01-01

    Prepulse inhibition (PPI) and reactivity of the acoustic startle response are widely used biobehavioral markers in psychopathology research. Previous studies have demonstrated that PPI and startle reactivity exhibit substantial within-site stability; between-site stability, however, has not been established. In two separate consortia investigating biomarkers of early psychosis, traveling subjects studies were performed as part of quality assurance procedures in order to assess the fidelity of data across sites. In the North American Prodromal Longitudinal Studies (NAPLS) Consortium, 8 normal subjects traveled to each of the 8 NAPLS sites and were tested twice at each site on the startle PPI paradigm. In preparation for a binational study, 10 healthy subjects were assessed twice in both San Diego and Mexico City. Intraclass correlations between and within sites were significant for PPI and startle response parameters, confirming the reliability of startle measures across sites in both consortia. There were between site differences in startle magnitude in the NAPLS study that did not appear to be related to methods or equipment. In planning multi-site studies, it is essential to institute quality assurance procedures early and establish between site reliability to assure comparable data across sites. PMID:23799460

  8. Laser assisted periodontal treatment: from bactericidal effect to local modification of the host response

    NASA Astrophysics Data System (ADS)

    Ciurescu, Codruţa.; Teslaru, Silvia; Zetu, Liviu; Ciurescu, Daniel

    2016-03-01

    The aim of the present short-term study is to investigate efficiency of laser therapy as adjunct to conventional periodontal therapy in patients with chronic periodontitis. Methods. The study protocol included 44 patients (20 males, 24 females; age 45-60) with moderate and advanced chronic periodontitis, recruited in Private Clinic Krondent (Brasov, Romania). The patients were randomly assigned in two groups, one group (test-sites group, 22 patients) treated by ultrasonic scaling and root planning followed by laser therapy (940 nm diode laser and 2780 nm Er:Cr:YAG laser) and second group (control-sites group, 22 patients) treated only by ultrasonic scaling and root planning. All patients were submitted to initial evaluation, recording of bleeding on probing (BOP) and probing of pockets depth (PPD), oral hygiene instruction and motivation. Indices BOP and PPD for the assessed periodontal sites were also recorded at 8 weeks, 16 weeks and 24 weeks after treatment. Results. Periodontal inflammatory parameters PPD (PPD>=4mm) were significantly lower in test-sites group as compared with control-sites group at 2 months (82% vs. 90%), 4 months (42% vs. 62%), and 6 months (11% vs. 30%).Periodontal parameters BOP were lower among patients in control-sites group and test-sites group at 2 months (38% vs. 32%), and significantly lower in test-sites group at 4 months (42% vs.26%), and 6 months (44% vs. 24%). Conclusions. The additional use of laser therapy increases significantly the efficiency of periodontal treatment comparing with conventional periodontal therapy.

  9. Deficient prepulse inhibition in schizophrenia detected by the multi-site COGS.

    PubMed

    Swerdlow, Neal R; Light, Gregory A; Sprock, Joyce; Calkins, Monica E; Green, Michael F; Greenwood, Tiffany A; Gur, Raquel E; Gur, Ruben C; Lazzeroni, Laura C; Nuechterlein, Keith H; Radant, Allen D; Ray, Amrita; Seidman, Larry J; Siever, Larry J; Silverman, Jeremy M; Stone, William S; Sugar, Catherine A; Tsuang, Debby W; Tsuang, Ming T; Turetsky, Bruce I; Braff, David L

    2014-02-01

    Startle inhibition by weak prepulses (PPI) is studied to understand the biology of information processing in schizophrenia patients and healthy comparison subjects (HCS). The Consortium on the Genetics of Schizophrenia (COGS) identified associations between PPI and single nucleotide polymorphisms in schizophrenia probands and unaffected relatives, and linkage analyses extended evidence for the genetics of PPI deficits in schizophrenia in the COGS-1 family study. These findings are being extended in a 5-site "COGS-2" study of 1800 patients and 1200 unrelated HCS to facilitate genetic analyses. We describe a planned interim analysis of COGS-2 PPI data. Eyeblink startle was measured in carefully screened HCS and schizophrenia patients (n=1402). Planned analyses of PPI (60 ms intervals) assessed effects of diagnosis, sex and test site, PPI-modifying effects of medications and smoking, and relationships between PPI and neurocognitive measures. 884 subjects met strict inclusion criteria. ANOVA of PPI revealed significant effects of diagnosis (p=0.0005) and sex (p<0.002), and a significant diagnosis×test site interaction. HCS>schizophrenia PPI differences were greatest among patients not taking 2nd generation antipsychotics, and were independent of smoking status. Modest but significant relationships were detected between PPI and performance in specific neurocognitive measures. The COGS-2 multi-site study detects schizophrenia-related PPI deficits reported in single-site studies, including patterns related to diagnosis, prepulse interval, sex, medication and other neurocognitive measures. Site differences were detected and explored. The target COGS-2 schizophrenia "endophenotype" of reduced PPI should prove valuable for identifying and confirming schizophrenia risk genes in future analyses. Copyright © 2013 Elsevier B.V. All rights reserved.

  10. Deficient prepulse inhibition in schizophrenia detected by the multi-site COGS

    PubMed Central

    Swerdlow, Neal R.; Light, Gregory A.; Sprock, Joyce; Calkins, Monica E.; Green, Michael F.; Greenwood, Tiffany A.; Gur, Raquel E.; Gur, Ruben C.; Lazzeroni, Laura C.; Nuechterlein, Keith H.; Radant, Allen D.; Ray, Amrita; Seidman, Larry J.; Siever, Larry J.; Silverman, Jeremy M.; Stone, William S.; Sugar, Catherine A.; Tsuang, Debby W.; Tsuang, Ming T.; Turetsky, Bruce I.; Braff, David L.

    2014-01-01

    Background Startle inhibition by weak prepulses (PPI) is studied to understand the biology of information processing in schizophrenia patients and healthy comparison subjects (HCS). The Consortium on the Genetics of Schizophrenia (COGS) identified associations between PPI and single nucleotide polymorphisms in schizophrenia probands and unaffected relatives, and linkage analyses extended evidence for the genetics of PPI deficits in schizophrenia in the COGS-1 family study. These findings are being extended in a 5-site “COGS-2” study of 1800 patients and 1200 unrelated HCS to facilitate genetic analyses. We describe a planned interim analysis of COGS-2 PPI data. Methods Eyeblink startle was measured in carefully screened HCS and schizophrenia patients (n=1402). Planned analyses of PPI (60 ms intervals) assessed effects of diagnosis, sex and test site, PPI-modifying effects of medications and smoking, and relationships between PPI and neurocognitive measures. Results 884 subjects met strict inclusion criteria. ANOVA of PPI revealed significant effects of diagnosis (p=0.0005) and sex (p<0.002), and a significant diagnosis × test site interaction. HCS > schizophrenia PPI differences were greatest among patients not taking 2nd generation antipsychotics, and were independent of smoking status. Modest but significant relationships were detected between PPI and performance in specific neurocognitive measures. Discussion The COGS-2 multi-site study detects schizophrenia-related PPI deficits reported in single-site studies, including patterns related to diagnosis, prepulse interval, sex, medication and other neurocognitive measures. Site differences were detected and explored. The target COGS-2 schizophrenia “endophenotype” of reduced PPI should prove valuable for identifying and confirming schizophrenia risk genes in future analyses. PMID:24405980

  11. Natura 2000 appropriate assessment: Shortcomings and improvements in Finnish practice

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Soederman, Tara

    2009-02-15

    The EU Habitats Directive 92/43/EEC requires impact assessments called Appropriate Assessments (AA) for plans and projects probably having adverse effects on the sites of European ecological importance, Natura 2000 sites. Seventy-three Appropriate Assessment reports and seventy official opinions given on them by regional environmental authorities from 1997 to 2005 were reviewed. The findings of the study demonstrate typical shortcomings of ecological impact assessment: a weak information basis for assessment outcomes and lack of proper cumulative impact assessment with respect to ecological structures and processes. The quality of reporting has improved over time with respect to direct impacts on individual habitatmore » types and species and detailed mitigation measures. Regional environment centres considered one fifth of the AA reports to be inadequate because of lacking data. In most cases the regional environment centres demanded a change of plan or project, added mitigation measures, choice of only one alternative for further planning or a new completed assessment with additional information in order to be able to evaluate the significance of the effects. The study underlines the need for iterative planning practices in which the preparation of a plan or project with alternative options goes hand in hand with the impact assessment equipped with sufficient data.« less

  12. Evaluation of Dosimetry Check software for IMRT patient-specific quality assurance.

    PubMed

    Narayanasamy, Ganesh; Zalman, Travis; Ha, Chul S; Papanikolaou, Niko; Stathakis, Sotirios

    2015-05-08

    The purpose of this study is to evaluate the use of the Dosimetry Check system for patient-specific IMRT QA. Typical QA methods measure the dose in an array dosimeter surrounded by homogenous medium for which the treatment plan has been recomputed. With the Dosimetry Check system, fluence measurements acquired on a portal dosimeter is applied to the patient's CT scans. Instead of making dose comparisons in a plane, Dosimetry Check system produces isodose lines and dose-volume histograms based on the planning CT images. By exporting the dose distribution from the treatment planning system into the Dosimetry Check system, one is able to make a direct comparison between the calculated dose and the planned dose. The versatility of the software is evaluated with respect to the two IMRT techniques - step and shoot and volumetric arc therapy. The system analyzed measurements made using EPID, PTW seven29, and IBA MatriXX, and an intercomparison study was performed. Plans from patients previously treated at our institution with treated anatomical site on brain, head & neck, liver, lung, and prostate were analyzed using Dosimetry Check system for any anatomical site dependence. We have recommendations and possible precautions that may be necessary to ensure proper QA with the Dosimetry Check system.

  13. Phase I Investigations at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, in 2010-2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report presents the technical findings of Phase I of Argonne’s studies. The Phase I field investigation was initiated on October 18, 2010. The work was conducted in accord with (1) the final site-specific Phase I Work Plan for Montgomery City (Argonne 2010; approved by the MDNR [2010]); (2) applicable Missouri regulations; and (3) the standard operating procedures, quality assurance/quality control (QA/QC) measures, and general health and safety policies outlined in the Master Work Plan (Argonne 2002) for operations in Kansas, which was reviewed by the MDNR and accepted for current use. A draft master plan specific to work inmore » Missouri and a set of draft standard operating procedures are in review with the MDNR. The site-specific Work Plan for Montgomery City (Argonne 2010) (1) summarizes the pre-existing knowledge base for the Montgomery City investigation site compiled by Argonne and (2) describes the site-specific technical objectives and the intended scope of work developed for the first phase of the investigation. Three primary technical objectives were identified for the Phase I studies, as follows: 1. Update the presently identified inventory and status of private and public drinking water wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for volatile organic compounds (VOCs) and geochemical analyses. In conjunction with this effort, determine the present sources(s) of drinking water for all residents in an approximate 0.5-mi radius of the former CCC/USDA facility. 2. Investigate for possible evidence of a soil source of carbon tetrachloride contamination in the unconsolidated sediments beneath the former CCC/USDA facility that might affect the underlying bedrock aquifer units. 3. Obtain preliminary information on the site-specific lithologic and hydrologic characteristics of the unconsolidated sediments overlying bedrock at the former CCC/USDA grain storage location. Section 2 of this report describes the investigative methods used in the 2010-2011 studies and provides a chronological summary of the field events conducted. Section 3 presents a summary of the resulting field and laboratory data. These data, together with information presented in the site-specific Work Plan (Argonne 2010), are interpreted and integrated in Section 4 to (1) develop a preliminary conceptual model of the hydrogeologic framework affecting groundwater and potential contaminant migration in the vicinity of the former CCC/USDA facility and (2) serve as a basis for the initial consideration of contaminant levels and potential exposure pathways that might be of concern in the evaluation of risks to human health, public welfare, and the environment. The working conclusions drawn from the 2010-2011 studies are presented, along with recommendations, in Section 5.« less

  14. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  15. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  16. The 1975 report on active and planned spacecraft and experiments. [index

    NASA Technical Reports Server (NTRS)

    Horowitz, R. (Editor); Davis, L. R. (Editor)

    1975-01-01

    Information is presented on current and planned spacecraft activity for various disciplines: astronomy, earth sciences, meteorology, planetary sciences, aeronomy, solar physics, and life sciences. For active orbiting spacecraft, the epoch date, orbit type, orbit period, apoasis, periapsis, and inclination are given along with the spacecraft weight, launch date, launch site, launch vehicle, and sponsoring agency. For each planned orbiting spacecraft, the orbit parameters, planned launch date, launch site, launch vehicle, spacecraft weight, and sponsoring agency are given.

  17. Site characterization report for the basalt waste isolation project. Volume II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-11-01

    The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987,more » and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.« less

  18. 78 FR 78326 - Revision of the Land Management Plans for the Inyo, Sierra and Sequoia National Forests

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... posted to the Region 5 Web site at http://www.fs.usda.gov/main/r5/landmanagement/planning . The Forest... through press release and on the above Web site shown. The Web site will also provide recommended reading... inspection and copying. FOR FURTHER INFORMATION CONTACT: Debra Whitall, Regional Social Scientist, 707-562...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, J; Li, X; Liu, G

    Purpose: We compare and investigate the dosimetric impacts on pencil beam scanning (PBS) proton treatment plans generated with CT calibration curves from four different CT scanners and one averaged ‘global’ CT calibration curve. Methods: The four CT scanners are located at three different hospital locations within the same health system. CT density calibration curves were collected from these scanners using the same CT calibration phantom and acquisition parameters. Mass density to HU value tables were then commissioned in a commercial treatment planning system. Five disease sites were chosen for dosimetric comparisons at brain, lung, head and neck, adrenal, and prostate.more » Three types of PBS plans were generated at each treatment site using SFUD, IMPT, and robustness optimized IMPT techniques. 3D dose differences were investigated using 3D Gamma analysis. Results: The CT calibration curves for all four scanners display very similar shapes. Large HU differences were observed at both the high HU and low HU regions of the curves. Large dose differences were generally observed at the distal edges of the beams and they are beam angle dependent. Out of the five treatment sites, lung plans exhibits the most overall range uncertainties and prostate plans have the greatest dose discrepancy. There are no significant differences between the SFUD, IMPT, and the RO-IMPT methods. 3D gamma analysis with 3%, 3 mm criteria showed all plans with greater than 95% passing rate. Two of the scanners with close HU values have negligible dose difference except for lung. Conclusion: Our study shows that there are more than 5% dosimetric differences between different CT calibration curves. PBS treatment plans generated with SFUD, IMPT, and the robustness optimized IMPT has similar sensitivity to the CT density uncertainty. More patient data and tighter gamma criteria based on structure location and size will be used for further investigation.« less

  20. Water-Quality Characteristics for Selected Sites Within the Milwaukee Metropolitan Sewerage District Planning Area, Wisconsin, February 2004-September 2005

    USGS Publications Warehouse

    Thomas, Judith C.; Lutz, Michelle A.; Bruce, Jennifer L.; Graczyk, David J.; Richards, Kevin D.; Krabbenhoft, David P.; Westenbroek, Stephen M.; Scudder, Barbara C.; Sullivan, Daniel J.; Bell, Amanda H.

    2007-01-01

    The Milwaukee Metropolitan Sewerage District (MMSD) Corridor Study is a three-phase project designed to improve the understanding of water resources in the MMSD planning area to assist managers and policy makers in their decisions. Phase I of the Study involved the compilation of existing data from multiple agencies into a single database. These data were analyzed to identify spatial, temporal, and technological gaps in the planning area, and were used to develop Phase II of the Study. Phase II, the subject of this report, involved an intensive data-collection effort by the U.S. Geological Survey (USGS) in cooperation with MMSD (from February, 2004, through September, 2005). This phase addressed the data gaps identified in Phase I and completed a baseline assessment of water quality for selected stream and harbor sites in the MMSD planning area. This baseline assessment included evaluations of surface-water chemistry and microbial concentrations in the streams and harbor sites; additionally, stream sites were evaluated for discharge, sediment chemistry, fish-tissue chemistry, habitat, and the quality of biological communities (including fish, macroinvertebrates, and algae). In all, data were collected at 15 stream and 6 harbor sites within the MMSD planning area, including manual sampling and analysis for more than 220 water-quality properties and constituents at all 21 sites, stream-discharge data for 14 stream sites, and automated water-quality sampling at 4 stream sites. A bioassessment during autumn 2004 included collection of biologic-community data and stream-habitat data at wadeable streams. Quartiles of Phase II aggregate bioassessment rankings were used to divide the 14 wadeable stream sites into four groups to investigate relations between bioassessment data and site characteristic and water-quality data. Quartile numbers reflect relative water quality: quartile 1 contained sites where the bioassessment data indicated the least-degraded water quality among those sampled, and quartile 4 contained sites that indicated the most-degraded water quality. Quartiles contained the following stream sites: Quartile 1: Milwaukee River near Cedarburg, Milwaukee River at Milwaukee, Jewel Creek, and Menomonee River at Menomonee Falls; Quartile 2: Willow Creek, Root River near Franklin, and Root River at Grange Avenue; Quartile 3: Menomonee River at Wauwatosa, Oak Creek, and Little Menomonee River; and Quartile 4: Honey Creek, Underwood Creek, Lincoln Creek, and Kinnickinnic River. Site characteristics (in this case, drainage area and land use) and selected water-quality data were summarized based on the four bioassessment quartiles to determine if there were relations with the aggregate bioassessment rankings. In general, sites having the largest drainage basins with the lowest proportion of urban land use were in quartile 1, and the smallest drainage basins with the highest proportion of urban land use were in quartile 4. Major ions, indicator organisms, and wastewater compounds generally had the lowest overall results in quartile 1 and highest overall results in quartile 4, with intermediate results in quartiles 2 and 3. Results for other constituent types (nutrients, mercury, pathogenic organisms, and bed sediment) were mixed, with results for some constituents decreasing from quartile 1 to quartile 4. Where sufficient Phase I data were available, summary statistics (including medians) for chemical and biological data were calculated, allowing some comparisons to be made between Phase I and Phase II data. Comparisons between Phase I and Phase II results indicated a variety of changes with respect to water quality. Concentrations of chloride, nitrate, chlorophyll a, total phosphorus in water; arsenic in bed sediment; and fish Index of Biotic Integrity ratings generally indicated declines in water quality. However, concentrations of total nitrogen, suspended sediment, and fecal coliform in water; some trace eleme

  1. View from the top: CEO perspectives on executive development and succession planning practices in healthcare organizations.

    PubMed

    Groves, Kevin S

    2006-01-01

    Many healthcare professionals question whether the industry's hospitals and multi-site systems are implementing the necessary executive development and succession planning systems to ensure that high potential managers are prepared and aptly selected to assume key executive roles. Survey data, case studies, and cross-industry comparisons suggest that healthcare organizations may face a leadership crisis as the current generation of chief executive officers (CEOs) nears retirement while traditional means of developing the leadership pipeline, including middle-management positions and graduate programs requiring formal residencies, continue to dissipate. Given the daunting challenges that accompany the healthcare industry's quest to identify, develop, and retain leadership talent, this article provides best practice findings from a qualitative study of 13 healthcare organizations with a record of exemplary executive development and succession planning practices. CEOs from six single-site hospitals, six healthcare systems, and one medical group were interviewed to identify industry best practices so that healthcare practitioners and educators may utilize the findings to enhance the industry's leadership capacity.

  2. Serramonte Transit Center Study

    DOT National Transportation Integrated Search

    1983-06-01

    The purposes of the study are to determine, from this particular case -- the : Serramonte Center Plan -- guidelines for achieving the successful design and : operation of a bus station and bus access arrangement on a shopping center site, : including...

  3. Cornell University remote sensing program. [application to waste disposal site selection, study of drainage patterns, and water quality management.

    NASA Technical Reports Server (NTRS)

    Liang, T.; Mcnair, A. J.; Philipson, W. R.

    1977-01-01

    Aircraft and satellite remote sensing technology were applied in the following areas: (1) evaluation of proposed fly ash disposal sites; (2) development of priorities for drainage improvements; (3) state park analysis for rehabilitation and development; (4) watershed study for water quality planning; and (5) assistance project-landfill site selection. Results are briefly summarized. Other projects conducted include: (1) assessment of vineyard-related problems; (2) LANDSAT analysis for pheasant range management; (3) photo-historic evaluation of Revolutionary War sites; and (4) thermal analysis of building insulation. The objectives, expected benefits and actions, and status of these projects are described.

  4. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less

  5. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, K.A.; Mitchell, M.M.; Jean, D.

    1997-09-01

    This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations.

  6. 36 CFR 251.58 - Cost recovery.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... allocation decisions, corridor or communications site planning, and biological studies that address species diversity, unless they are necessary for the application. Proportional costs for analyses, such as capacity...

  7. 36 CFR 251.58 - Cost recovery.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... allocation decisions, corridor or communications site planning, and biological studies that address species diversity, unless they are necessary for the application. Proportional costs for analyses, such as capacity...

  8. 36 CFR 251.58 - Cost recovery.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... allocation decisions, corridor or communications site planning, and biological studies that address species diversity, unless they are necessary for the application. Proportional costs for analyses, such as capacity...

  9. 36 CFR 251.58 - Cost recovery.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... allocation decisions, corridor or communications site planning, and biological studies that address species diversity, unless they are necessary for the application. Proportional costs for analyses, such as capacity...

  10. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S&H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactivemore » materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures.« less

  11. 77 FR 47617 - Notice of Submission for OMB Review; Office of Planning, Evaluation and Policy Development...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... information technology. Please note that written comments received in response to this notice will be... conducting qualitative case studies of up to 15 sites with a focus on preventing students from dropping out... qualitative data across multiple respondents to generate portraits of programs and strategies that the sites...

  12. Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Campbell, Sam

    Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less

  13. A Study of the Communication Capabilities of the OPARS Flight Planning System for Various Levels of Demand.

    DTIC Science & Technology

    1980-03-01

    Oceanography Center (FNOC) is currently testing and evaluating a computerized flight plan system, referred to, for short, as OPARS. This sytem , developed to...replace the Lockheed Jetplan flight plan sytem , provides users at remote sites with direct access to the FNOC computer via 11 telephone lines. The...validity, but only for format. For example, an entry of ABCE , as the four- letter identification code for the destination airfield, would be accepted

  14. Tales from the new frontier: pioneers' experiences with consumer-driven health care.

    PubMed

    Lo Sasso, Anthony T; Rice, Thomas; Gabel, Jon R; Whitmore, Heidi

    2004-08-01

    To conduct site visits to study the early experiences of firms offering consumer-driven health care (CDHC) plans to their employees and firms that provide CDHC products. A convenience sample of three firms offering CDHC products to their employees, one of which is also a large insurer, and one firm offering an early CDHC product to employers. We conducted onsite interviews of four companies during the spring and summer of 2003. These four cases were not selected randomly. We contacted organizations that already had a consumer-driven plan in place by January 2002 so as to provide a complete year's worth of experience with CDHC. The experience of the companies we visited indicated that favorable selection tends to result when a CDHC plan is introduced alongside traditional preferred provider organization (PPO) and health maintenance organization (HMO) plan offerings. Two sites demonstrated substantial cost-savings. Our case studies also indicate that the more mundane aspects of health care benefits are still crucial under CDHC. The size of the provider network accessible through the CDHC plan was critical, as was the role of premium contributions in the benefit design. Also, companies highlighted the importance of educating employees about new CDHC products: employees who understood the product were more likely to enroll. Our site visits suggest the peril (risk selection) and the promise (cost savings) of CDHC. At this point there is still far more that we do not know about CDHC than we do know. Little is known about the extent to which CDHC changes people's behavior, the extent to which quality of care is affected by CDHC, and whether web-based information and tools actually make patients become better consumers.

  15. Work Plan for Site-Wide Assessment for Petroleum Product (Operable Unit 2) May 2012

    EPA Pesticide Factsheets

    May 2012 redlined plan assessment of light non-aqueous phase liquid (LNAPL) petroleum product potentially present at the LCP Chemicals Superfund Site, GA. Region ID: 04 DocID: 10922562, DocDate: 05-09-2012

  16. Life Cycle Project Plan Outline: Web Sites and Web-based Applications

    EPA Pesticide Factsheets

    This tool is a guideline for planning and checking for 508 compliance on web sites and web based applications. Determine which EIT components are covered or excepted, which 508 standards and requirements apply, and how to implement them.

  17. 13. Site D57 & 58C, Layout and Utility Plan, U.S. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Site D-57 & 58-C, Layout and Utility Plan, U.S. Army Corps of Engineers, 1 March 1957. - Newport NIKE Missile Battery D-57/58, Integrated Fire Control Area, Newport Road, Carleton, Monroe County, MI

  18. 7 CFR 1924.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE... CONSTRUCTION AND REPAIR Planning and Performing Site Development Work § 1924.101 Purpose. This subpart establishes the basic Rural Housing Service (RHS) policies for planning and performing site development work...

  19. 1. GENERAL VIEW OF OBSERVATION BUNKERS TO THE EAST OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. GENERAL VIEW OF OBSERVATION BUNKERS TO THE EAST OF TEST STAND 1-A: IN FOREGROUND, BUILDING 8769, A TWO WINDOW DESIGN (NOT ON SITE PLAN); IN THE MIDDLE DISTANCE, BUILDING 8768, A ONE WINDOW DESIGN "OBSERVATION AND CAMERA BUILDING NO. 2" ON SITE PLAN; IN THE DISTANCE, AT FAR LEFT, BUILDING 8767, A FOUR WINDOW DESIGN "MASTER OBSERVATION AND CAMERA BUILDING NO. 1" ON SITE PLAN. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA

  20. Exploring spatial patterns of vulnerability for diverse biodiversity descriptors in regional conservation planning.

    PubMed

    Vimal, Ruppert; Pluvinet, Pascal; Sacca, Céline; Mazagol, Pierre-Olivier; Etlicher, Bernard; Thompson, John D

    2012-03-01

    In this study, we developed a multi-criteria assessment of spatial variability of the vulnerability of three different biodiversity descriptors: sites of high conservation interest by virtue of the presence of rare or remarkable species, extensive areas of high ecological integrity, and landscape diversity in grid cells across an entire region. We assessed vulnerability in relation to (a) direct threats in and around sites to a distance of 2 km associated with intensive agriculture, building and road infrastructure and (b) indirect effects of human population density on a wider scale (50 km). The different combinations of biodiversity and threat indicators allowed us to set differential priorities for biodiversity conservation and assess their spatial variation. For example, with this method we identified sites and grid cells which combined high biodiversity with either high threat values or low threat values for the three different biodiversity indicators. In these two classes the priorities for conservation planning will be different, reduce threat values in the former and restrain any increase in the latter. We also identified low priority sites (low biodiversity with either high or low threats). This procedure thus allows for the integration of a spatial ranking of vulnerability into priority setting for regional conservation planning. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  2. 78 FR 59913 - Revision of the Land Management Plan for the Francis Marion National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... our Web site. We are inviting the public to help us develop a preliminary ``need for change'' and a... revision of the Francis Marion NF land management plan will be posted on the following Web site at www.fs... preliminary ``need for change'' and a proposed action will be announced on the Web site cited above. It is...

  3. 78 FR 69814 - Revision of the Land Management Plan for El Yunque National Forest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... to our Web site. We are inviting the public to help us develop a preliminary ``need for change'' and... the revision of El Yunque NF land management plan will be posted on the following Web site at www.fs... preliminary ``need for change'' and a proposed action will be announced on the Web site cited above. It is...

  4. 13. "CIVIL, SITE PLAN AND VICINITY MAP, AREA LOCATIONS." Test ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. "CIVIL, SITE PLAN AND VICINITY MAP, AREA LOCATIONS." Test Area 1-125. Specifications No. ENG (NASA)-04-35363-1; Drawing No. 60-09-34; sheet 11. Ref. No. C-l. D.O. SERIES 1597/1. Approved for siting on 24 April 1962. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  5. Study of hydraulic power recovery from New Mexico water distribution systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schoenmackers, R.

    1984-02-01

    The results of a survey of New Mexico water distribution systems suitable for hydroelectric power development are reported. The objectives of the survey were to determine the potential for hydraulic power recovery from existing and planned water systems, to identify potential sites, and to study and recommend promising sites for further development. The survey found eleven sites in New Mexico water distribution systems with a total hydroelectric power potential of 736 kilowatts. Seven of these sites, or 439 kilowatts, could be developed immediately, having everything necessary in place but the turbine generator. These sites are located in the Bonito pipelinemore » near Carrizozo (2 sites), Raton, Ruidoso, Santa Fe, Sugarite, and Taos. If all seven sites were developed, the annual energy production could reach 3,800,000 kilowatt hours.« less

  6. Statistical design and analysis of environmental studies for plutonium and other transuranics at NAEG ''safety-shot'' sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilbert, R.O.; Eberhardt, L.L.; Fowler, E.B.

    This paper is centered around the use of stratified random sampling for estimating the total amount (inventory) of $sup 239-240$Pu and uranium in surface soil at ten ''safety-shot'' sites on the Nevada Test Site (NTS) and Tonopah Test Range (TTR) that are currently being studied by the Nevada Applied Ecology Group (NAEG). The use of stratified random sampling has resulted in estimates of inventory at these desert study sites that have smaller standard errors than would have been the case had simple random sampling (no stratification) been used. Estimates of inventory are given for $sup 235$U, $sup 238$U, and $supmore » 239-240$Pu in soil at A Site of Area 11 on the NTS. Other results presented include average concentrations of one or more of these isotopes in soil and vegetation and in soil profile samples at depths to 25 cm. The regression relationship between soil and vegetation concentrations of $sup 235$U and $sup 238$U at adjacent sampling locations is also examined using three different models. The applicability of stratified random sampling to the estimation of concentration contours of $sup 239-240$Pu in surface soil using computer algorithms is also investigated. Estimates of such contours are obtained using several different methods. The planning of field sampling plans for estimating inventory and distribution is discussed. (auth)« less

  7. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  8. The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Ralph

    One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can findmore » themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)« less

  9. Fort Devens Feasibility Study (FS) for Group 1A Sites, Final Data Gap Activities Work Plan

    DTIC Science & Technology

    1993-03-01

    3-6 3.1.7 Railroad Roundhouse ......................... 3-7 3.2 COLD SPRING BROOK LANDFILL BACKGROUND AND U CONDITIONS...wells SHL-3 and SHL-7) is the site of a former railroad roundhouse . This roundhouse was used between 1900 and 1935. Because of the age of the... Roundhouse 5 Environmental samples will be collected at four locations at the site of the former railroad roundhouse adjacent to Shepley’s Hill

  10. An Overview of the Micro Pulse Lidar Network (MPLNET)

    NASA Technical Reports Server (NTRS)

    Welton, Ellsworth

    2010-01-01

    The NASA Micro Pulse Lidar Network (MPLNET) is a federated network of Micro Pulse Lidar (MPL) systems designed to measure aerosol and cloud vertical structure continuously, day and night, over long time periods required to contribute to climate change studies and provide ground validation for models and satellite sensors in the NASA Earth Observing System (FOS). At present, there are eighteen active sites worldwide, and several more in the planning stage. Numerous temporary sites are deployed in support of various field campaigns. Most MPLNET sites are co-located with sites in the NASA Aerosol Robotic Network (AERONET) to provide both column and vertically resolved aerosol and cloud data. MPLNET data and more information on the project are available at http://mpinet.gsfc.nasa.gov . Here we present a summary of the first ten years of MPLNET, along with an overview of our current status, specifically our version two data products and applications. Future network plans will be presented, with a focus on our activities in South East Asia.

  11. Exploring the Links between Post-Industrial Landscape History and Ecology through Participatory Methods

    PubMed Central

    2015-01-01

    There is increasing recognition of the importance for local biodiversity of post-mining sites, many of which lie near communities that have suffered significant social and economic deprivation as the result of mine closures. However, no studies to date have actively used the knowledge of local communities to relate the history and treatment of post-mining sites to their current ecological status. We report a study of two post-mining sites in the Yorkshire coalfield of the UK in which the local community were involved in developing site histories and assessing plant and invertebrate species composition. Site histories developed using participatory GIS revealed that the sites had a mixture of areas of spontaneous succession and technical reclamation, and identified that both planned management interventions and informal activities influenced habitat heterogeneity and ecological diversity. Two groups of informal activity were identified as being of particular importance. Firstly, there has been active protection by the community of flower-rich habitats of conservation value (e.g. calcareous grassland) and distinctive plant species (e.g. orchids) which has also provided important foraging resources for butterfly and bumblebee species. Secondly, disturbance by activities such as use of motorbikes, informal camping, and cutting of trees and shrubs for fuel, as well as planned management interventions such as spreading of brick rubble, has provided habitat for plant species of open waste ground and locally uncommon invertebrate species which require patches of bare ground. This study demonstrates the importance of informal, and often unrecorded, activities by the local community in providing diverse habitats and increased biodiversity within a post-mining site, and shows that active engagement with the local community and use of local knowledge can enhance ecological interpretation of such sites and provide a stronger basis for successful future management. PMID:26309041

  12. Exploring the Links between Post-Industrial Landscape History and Ecology through Participatory Methods.

    PubMed

    Rich, Kevin J; Ridealgh, Michael; West, Sarah E; Cinderby, Steve; Ashmore, Mike

    2015-01-01

    There is increasing recognition of the importance for local biodiversity of post-mining sites, many of which lie near communities that have suffered significant social and economic deprivation as the result of mine closures. However, no studies to date have actively used the knowledge of local communities to relate the history and treatment of post-mining sites to their current ecological status. We report a study of two post-mining sites in the Yorkshire coalfield of the UK in which the local community were involved in developing site histories and assessing plant and invertebrate species composition. Site histories developed using participatory GIS revealed that the sites had a mixture of areas of spontaneous succession and technical reclamation, and identified that both planned management interventions and informal activities influenced habitat heterogeneity and ecological diversity. Two groups of informal activity were identified as being of particular importance. Firstly, there has been active protection by the community of flower-rich habitats of conservation value (e.g. calcareous grassland) and distinctive plant species (e.g. orchids) which has also provided important foraging resources for butterfly and bumblebee species. Secondly, disturbance by activities such as use of motorbikes, informal camping, and cutting of trees and shrubs for fuel, as well as planned management interventions such as spreading of brick rubble, has provided habitat for plant species of open waste ground and locally uncommon invertebrate species which require patches of bare ground. This study demonstrates the importance of informal, and often unrecorded, activities by the local community in providing diverse habitats and increased biodiversity within a post-mining site, and shows that active engagement with the local community and use of local knowledge can enhance ecological interpretation of such sites and provide a stronger basis for successful future management.

  13. Lead and Copper Tap Sample Site Plan Instructions

    EPA Pesticide Factsheets

    This document may be used by public water systems in Wyoming and on EPA R8 Tribal Lands as a guide for how to properly complete their lead and copper tap sample site plans to comply with the Lead and Copper Rule.

  14. Photocopy of site plan, Dene Hendrick, delineator, 1977, for the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of site plan, Dene Hendrick, delineator, 1977, for the City of San Jose in cooperative agreement with the California Department of Transportation (from the San Jose Historical Museum) - Stevens Ranch Complex, State Route 101, Coyote, Santa Clara County, CA

  15. 63. Photograph of line drawing. SITE PLAN OF GANTRY CRANE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. Photograph of line drawing. SITE PLAN OF GANTRY CRANE TRACKS AND 20,000 POUND MOTOR TEST AND LAUNCH FACILITY ('BLAST PIT'), OCTOBER 1946 - White Sands Missile Range, V-2 Rocket Facilities, Near Headquarters Area, White Sands, Dona Ana County, NM

  16. 14. Site D57C, Improved NIKEHercules System, Grading Plan, U.S. Army ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Site D-57-C, Improved NIKE-Hercules System, Grading Plan, U.S. Army Corps of Engineers, 18 January 1962. - Newport NIKE Missile Battery D-57/58, Integrated Fire Control Area, Newport Road, Carleton, Monroe County, MI

  17. Institutional Controls: A Guide to Preparing Institutional Control Implementation and Assurance Plans at Contaminated Sites

    EPA Pesticide Factsheets

    The purpose of this document is to provide guidance to the EPA Regions for developing Institutional Control Implementation and Assurance Plans (ICIAPs) at contaminated sites where the response action includes an institutional controls (ICs) component.

  18. ENVIRONMENTAL METHODS TESTING SITE PROJECT: DATA MANAGEMENT PROCEDURES PLAN

    EPA Science Inventory

    The Environmental Methods Testing Site (EMTS) Data Management Procedures Plan identifies the computer hardware and software resources used in the EMTS project. It identifies the major software packages that are available for use by principal investigators for the analysis of data...

  19. Post-Closure Strategy for Use-Restricted Sites on the Nevada National Security Site, Nevada Test and Training Range, and Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less

  20. 18. Photographic copy of site plan for additions to North ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Plan, February 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  1. Site characterization plan: Yucca Mountain Site, Nevada Research and Development Area, Nevada: Volume 8, Part B: Chapter 8, Sections 8.3.5 through 8.3.5.20

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1988-12-01

    This site characterization plan (SCP) has been developed for the candidate repository site at Yucca Mountain in the State of Nevada. The SCP includes a description of the Yucca Mountain site (Chapters 1-5), a conceptual design for the repository (Chapter 6), a description of the packaging to be used for the waste to be emplaced in the repository (Chapter 7), and a description of the planned site characterization activities (Chapter 8). The schedules and milestones presented in Sections 8.3 and 8.5 of the SCP were developed to be consistent with the June 1988 draft Amendment to the DOE`s Mission Planmore » for the Civilian Radioactive Waste Management Program. The five month delay in the scheduled start of exploratory shaft construction that was announced recently is not reflected in these schedules. 68 figs., 102 tabs.« less

  2. A Multi-criteria Decision Analysis System for Prioritizing Sites and Types of Low Impact Development Practices

    NASA Astrophysics Data System (ADS)

    Song, Jae Yeol; Chung, Eun-Sung

    2017-04-01

    This study developed a multi-criteria decision analysis framework to prioritize sites and types of low impact development (LID) practices. This framework was systemized as a web-based system coupled with the Storm Water Management Model (SWMM) from the Environmental Protection Agency (EPA). Using the technique for order of preference by similarity to ideal solution (TOPSIS), which is a type of multi-criteria decision-making (MCDM) method, multiple types and sites of designated LID practices are prioritized. This system is named the Water Management Prioritization Module (WMPM) and is an improved version of the Water Management Analysis Module (WMAM) that automatically generates and simulates multiple scenarios of LID design and planning parameters for a single LID type. WMPM can simultaneously determine the priority of multiple LID types and sites. In this study, an infiltration trench and permeable pavement were considered for multiple sub-catchments in South Korea to demonstrate the WMPM procedures. The TOPSIS method was manually incorporated to select the vulnerable target sub-catchments and to prioritize the LID planning scenarios for multiple types and sites considering socio-economic, hydrologic and physical-geometric factors. In this application, the Delphi method and entropy theory were used to determine the subjective and objective weights, respectively. Comparing the ranks derived by this system, two sub-catchments, S16 and S4, out of 18 were considered to be the most suitable places for installing an infiltration trench and porous pavement to reduce the peak and total flow, respectively, considering both socio-economic factors and hydrological effectiveness. WMPM can help policy-makers to objectively develop urban water plans for sustainable development. Keywords: Low Impact Development, Multi-Criteria Decision Analysis, SWMM, TOPSIS, Water Management Prioritization Module (WMPM)

  3. Outreach for Outreach: Targeting social media audiences to promote a NASA kids’ web site

    NASA Astrophysics Data System (ADS)

    Pham, C. C.

    2009-12-01

    The Space Place is a successful NASA web site that benefits upper elementary school students and educators by providing games, activities, and resources to stimulate interest in science, technology, engineering, and mathematics, as well as to inform the audience of NASA’s contributions. As online social networking grows to be a central component of modern communication, The Space Place has explored the benefits of integrating social networks with the web site to increase awareness of materials the web site offers. This study analyzes the capabilities of social networks, and specifically the demographics of Twitter and Facebook. It then compares these results with the content, audience, and perceived demographics of The Space Place web site. Based upon the demographic results, we identified a target constituency that would benefit from the integration of social networks into The Space Place web site. As a result of this study, a Twitter feed has been established that releases a daily tweet from The Space Place. In addition, a Facebook page has been created to showcase new content and prompt interaction among fans of The Space Place. Currently, plans are under way to populate the Space Place Facebook page. Each social network has been utilized in an effort to spark excitement about the content on The Space Place, as well as to attract followers to the main NASA Space Place web site. To pursue this idea further, a plan has been developed to promote NASA Space Place’s social media tools among the target audience.

  4. Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehman, L. L.; Nichols, W. E.

    The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements themore » requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.« less

  5. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  6. SU-E-J-92: On-Line Cone Beam CT Based Planning for Emergency and Palliative Radiation Therapy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Held, M; Morin, O; Pouliot, J

    2014-06-01

    Purpose: To evaluate and develop the feasibility of on-line cone beam CT based planning for emergency and palliative radiotherapy treatments. Methods: Subsequent to phantom studies, a case library of 28 clinical megavoltage cone beam CT (MVCBCT) was built to assess dose-planning accuracies on MVCBCT for all anatomical sites. A simple emergency treatment plan was created on the MVCBCT and copied to its reference CT. The agreement between the dose distributions of each image pair was evaluated by the mean dose difference of the dose volume and the gamma index of the central 2D axial plane. An array of popular urgentmore » and palliative cases was also evaluated for imaging component clearance and field-of-view. Results: The treatment cases were categorized into four groups (head and neck, thorax/spine, pelvis and extremities). Dose distributions for head and neck treatments were predicted accurately in all cases with a gamma index of >95% for 2% and 2 mm criteria. Thoracic spine treatments had a gamma index as low as 60% indicating a need for better uniformity correction and tissue density calibration. Small anatomy changes between CT and MVCBCT could contribute to local errors. Pelvis and sacral spine treatment cases had a gamma index between 90% and 98% for 3%/3 mm criteria. The limited FOV became an issue for large pelvis patients. Imaging clearance was difficult for cases where the tumor was positioned far off midline. Conclusion: The MVCBCT based dose planning and delivery approach is feasible in many treatment cases. Dose distributions for head and neck patients are unrestrictedly predictable. Some FOV restrictions apply to other treatment sites. Lung tissue is most challenging for accurate dose calculations given the current imaging filters and corrections. Additional clinical cases for extremities need to be included in the study to assess the full range of site-specific planning accuracies. This work is supported by Siemens.« less

  7. Heritage planning and rethinking the meaning and values of designating heritage sites in a post-disaster context: The case of Aceh, Indonesia

    NASA Astrophysics Data System (ADS)

    Meutia, Z. D.; Akbar, R.; Zulkaidi, D.

    2018-05-01

    Heritage has become a driver of development as stated in the New Urban Agenda 2016 report. A starting premise of most recent studies of the concept of heritage suggests that its nature is not as a static inheritance with fixed and enduring values. Rather, the identification of sites as heritage requires a process of identification, or heritage creation. Heritage is a fluid phenomenon rather than a static set of objects or sites with fixed meanings. This paper uses theory from Smith [1] who argued that there is no such thing as a heritage; heritage is essentially a cultural custom and social process. Today, site-based heritage planning only considers the values of old towns and lacks clarity in terms of values that create criteria for the designation of cultural heritage sites in another context. Yet, this approach is needed as a way to maintain urban assets that significantly contribute to the establishment of values and quality parts of the city. Heritage planning is also the act of communicating and remembering the past for the present and the future in the public domain. This paper aims to formulate a conceptual heritage planning of designating heritage sites that challenges the traditional notion of heritage which considers age as a key element in heritage, the privileges monumentality and grand scale, with scientific/aesthetic expert judgment as a requirement of heritage designations. The limited idea of heritage based on exclusive values as something ancient, grand-scale, historical, and with other exclusive values has excluded many places as heritage in communities emerging from disasters. Debates within the critical heritage studies movement argue that heritage is a cultural product linked to activities of remembering and is an act of communication. The dominant hypothesis is that heritage values cannot remain to exist if the physical or material aspects of sites are destroyed and this hypothesis feels flawed. This paper asks us to acknowledge the importance of understanding how local values create heritage, that heritage is not only about material and physical aspects but it is also a cultural process. The methodology used is ethnography with in-depth interviews to uncover meaning and values in this context. This paper uses the examples of how the sites in Aceh that were affected by the tsunami disaster in 2004 such as the PLTD Apung ship and the Mosque of Ulee Lheue are sites that a mutual and role of historical city relating to the potential as signs of civilization, historical values, commemorative values, religious values, and values of consensus within the community as outstanding local values, as a basis of consideration in rethinking the designations of heritage sites of less than 50 years old.

  8. Uranium-Bearing Evaporite Mineralization Influencing Plume Persistence. Literature Review and DOE-LM Site Surveys

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    This report on evaporite mineralization was completed as an Ancillary Work Plan for the Applied Studies and Technology program under the U.S. Department of Energy (DOE) Office of Legacy Management (LM). This study reviews all LM sites under Title I and Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) and one Decontamination and Decommissioning site to provide (1) a summary of which sites have evaporite deposits, (2) any available quantitative geochemical and mineralogical analyses, and (3) references to relevant reports. In this study, “evaporite” refers to any secondary mineral precipitate that occurs due to a loss ofmore » water through evaporative processes. This includes efflorescent salt crusts, where this term refers to a migration of dissolved constituents to the surface with a resulting salt crust, where “salt” can refer to any secondary precipitate, regardless of constituents. The potential for the formation of evaporites at LM sites has been identified, and may have relevance to plume persistence issues. Evaporite deposits have the potential to concentrate and store contaminants at LM sites that could later be re-released. These deposits can also provide a temporary storage mechanism for carbonate, chloride, and sulfate salts along with uranium and other contaminants of concern (COCs). Identification of sites with evaporites will be used in a new technical task plan (TTP), Persistent Secondary Contaminant Sources (PeSCS), for any proposed additional sampling and analyses. This additional study is currently under development and will focus on determining if the dissolution of evaporites has the potential to hinder natural flushing strategies and impact plume persistence. This report provides an initial literature review on evaporites followed by details for each site with identified evaporites. The final summary includes a table listing of all relevant LM sites regardless of evaporite identification.« less

  9. OTEC platform configuration and integration study. Volume I. Systems engineering and integration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-04-01

    The economic success of an Ocean Thermal Energy Conversion (OTEC) system is highly dependent on a platform which provides adequate support for the power system, accommodates reliably the cold water pipe, and is most cost effective. The results of a study conducted for the Department of Energy to assess six generic types of platforms to determine the most satisfactory platform for severl potential sites are presented. The six platform configurations are ship, circular barge, semi-submersible, Tuned Sphere, submersible, and spar. These represent directional and symmetric types of platforms which operate on the surface, at the interface, and submerged. The fivemore » sites for this study were primarily New Orleans, Keahole Point (Hawaii), Brazil, and secondarily Key West and Puerto Rico. Electrical transmission of energy by submarine cable is the planned form of energy transmission for all sites except Brazil, where chemical conversion is to be the method of transmission. This study is devoted to the platform (or ocean systems) of the OTEC plant which is chiefly comprised of the hull and structure, the seawater system, the position control system, and miscellaneous support/assembly systems. The principal elements in the work breakdown structure for the commercial plants are presented. The assessment of the six platform configurations was conducted utilizing a baseline plan (100-MW(e) (Net)) and site (New Orleans) with variations from the baseline to cover the range of interested platforms and sites.« less

  10. Approved Air Quality Implementation Plans in The Virgin Islands

    EPA Pesticide Factsheets

    This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.

  11. 10 CFR 60.17 - Contents of site characterization plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.17 Contents of site characterization plan. The... construction authorization for a geologic repository operations area; (4) Criteria, developed pursuant to... area for the location of a geologic repository; and (5) Any other information which the Commission, by...

  12. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  13. Jefferson Proving Ground, South of the Fining Line, Final Remedial Investigation/Feasibility Study, Resource Management Plan

    DTIC Science & Technology

    1993-01-01

    and various DOD sites. I From 1984 to 1987, Mr. Pincock was a Certified Radiation and Chemistry Technician for United Nuclear Industries. He performed...in 1983, Mr. Pincock assisted the senior technical staff in radiation protection as a Junior Health Physics Technician at the Nuclear Support Services...SCOPE OF PROGRAM This plan contains a description of the personnel and procedures for managing the Remedial Investigation/Feasibility Study (RI/FS) at

  14. No Further Remedial Action Planned Decision Document for Site 3.

    DTIC Science & Technology

    1998-04-01

    INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery

  15. Data Validation Package - June 2016 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Price, Jeffrey

    This event included annual sampling of groundwater and surface water locations at the Green River, Utah, Disposal Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lrnldownloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). Samples were collected from 15 monitoring wells and two surface locations at the disposal site as specified in the draft 2011 Ground Water Compliance Action Plan for the Green River, Utah, Disposal Site. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0179. Onemore » equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. See Attachment 2, Trip Reports for additional details. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that requires additional action or follow-up.« less

  16. "You can save time if…"-A qualitative study on internal factors slowing down clinical trials in Sub-Saharan Africa.

    PubMed

    Vischer, Nerina; Pfeiffer, Constanze; Limacher, Manuela; Burri, Christian

    2017-01-01

    The costs, complexity, legal requirements and number of amendments associated with clinical trials are rising constantly, which negatively affects the efficient conduct of trials. In Sub-Saharan Africa, this situation is exacerbated by capacity and funding limitations, which further increase the workload of clinical trialists. At the same time, trials are critically important for improving public health in these settings. The aim of this study was to identify the internal factors that slow down clinical trials in Sub-Saharan Africa. Here, factors are limited to those that exclusively relate to clinical trial teams and sponsors. These factors may be influenced independently of external conditions and may significantly increase trial efficiency if addressed by the respective teams. We conducted sixty key informant interviews with clinical trial staff working in different positions in two clinical research centres in Kenya, Ghana, Burkina Faso and Senegal. The study covered English- and French-speaking, and Eastern and Western parts of Sub-Saharan Africa. We performed thematic analysis of the interview transcripts. We found various internal factors associated with slowing down clinical trials; these were summarised into two broad themes, "planning" and "site organisation". These themes were consistently mentioned across positions and countries. "Planning" factors related to budget feasibility, clear project ideas, realistic deadlines, understanding of trial processes, adaptation to the local context and involvement of site staff in planning. "Site organisation" factors covered staff turnover, employment conditions, career paths, workload, delegation and management. We found that internal factors slowing down clinical trials are of high importance to trial staff. Our data suggest that adequate and coherent planning, careful assessment of the setting, clear task allocation and management capacity strengthening may help to overcome the identified internal factors and allow clinical trials to proceed more efficiently.

  17. 78 FR 33811 - Takes of Marine Mammals Incidental to Specified Activities; Low-Energy Marine Geophysical Survey...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-05

    ... . NMFS is not responsible for email comments sent to addresses other than the one provided here. Comments... (Philippines) during September to October 2013. The SIO plans to use one source vessel, the R/V Roger REVELLE... sites in the tropical western Pacific Ocean in September to October 2013. The study sites are located...

  18. PLUS: 'Planning Land Use with Students' is a Local Land Use Policy That Showcase the Geosciences

    NASA Astrophysics Data System (ADS)

    Turrin, M.

    2014-12-01

    Land Use decisions in the local community are well represented in geoscience topics and issues, and provide an excellent opportunity to showcase a wide range of geoscience careers to high school students. In PLUS (Planning Land Use with Students) we work with youth corps, volunteer agencies and the County Departments of Planning, Transportation, Public Health, Water Resources to run a program for high school seniors to engage the students in the complex layers of decision making connected with land use as we showcase geoscience careers (http://www.ldeo.columbia.edu/edu/plus/index.html). How development occurs, what resources are in use and who makes these decisions is both interesting and relevant for students. We develop case studies around current, active, local land use issues large enough in scale to have a formal environmental review at the County and/or the State level. Sections of each case study are dedicated to addressing the range of environmental issues that are central to each land use decision. Water, its availability, planned use and treatment on the site, brings in both a review of local hydrology and a discussion of storm water management. Air quality and the impact of the proposed project's density, transportation plans, and commercial and industrial uses brings in air quality issues like air quality ratings, existing pollution, and local air monitoring. A review of the site plans brings in grading plans for the project area, which highlights issues of drainage, soil stability, and exposure to toxins or pollutants depending on the historic use of the site. Brownfield redevelopments are especially challenging with various monitoring, clean up and usage restrictions that are extremely interesting to the students. Students' work with mentors from the community who represent various roles in the planning process including a range of geosciences, community business members and other players in the planning process. This interplay of individuals provides a realistic look at the forces that move land use decision-making in a community. Discussion of impacts and mitigations highlight the intersection of policy and science. Debate arises on how much science should guide policy and how much land use policy decisions require science monitoring, pushing new scientific developments.

  19. Integrating model abstraction into monitoring strategies

    USDA-ARS?s Scientific Manuscript database

    This study was designed and performed to investigate the opportunities and benefits of integrating model abstraction techniques into monitoring strategies. The study focused on future applications of modeling to contingency planning and management of potential and actual contaminant release sites wi...

  20. A Global Survey and Interactive Map Suite of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges: (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D)

    NASA Astrophysics Data System (ADS)

    Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.

    2017-12-01

    This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.

  1. Calculations for reproducible autologous skin cell-spray grafting.

    PubMed

    Esteban-Vives, Roger; Young, Matthew T; Zhu, Toby; Beiriger, Justin; Pekor, Chris; Ziembicki, Jenny; Corcos, Alain; Rubin, Peter; Gerlach, Jörg C

    2016-12-01

    Non-cultured, autologous cell-spray grafting is an alternative to mesh grafting for larger partial- and deep partial-thickness burn wounds. The treatment uses a suspension of isolated cells, from a patient's donor site skin tissue, and cell-spray deposition onto the wound that facilitates re-epithelialization. Existing protocols for therapeutic autologous skin cell isolation and cell-spray grafting have defined the donor site area to treatment area ratio of 1:80, substantially exceeding the coverage of conventional mesh grafting. However, ratios of 1:100 are possible by maximizing the wound treatment area with harvested cells from a given donor site skin tissue according to a given burn area. Although cell isolation methods are very well described in the literature, a rational approach addressing critical aspects of these techniques are of interest in planning clinical study protocols. We considered in an experimental study the cell yield as a function of the donor site skin tissue, the cell density for spray grafting, the liquid spray volume, the sprayed distribution area, and the percentage of surface coverage. The experimental data was then used for the development of constants and mathematical equations to give a rationale for the cell isolation and cell-spray grafting processes and in planning for clinical studies. Copyright © 2016 Elsevier Ltd and ISBI. All rights reserved.

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  3. Rural-Urban Differences in Awareness and Use of Family Planning Services Among Adolescent Women in California.

    PubMed

    Yarger, Jennifer; Decker, Martha J; Campa, Mary I; Brindis, Claire D

    2017-04-01

    The purpose of this study was to compare awareness and use of family planning services by rural and urban program site among a sample of adolescent women before participation in the federal Personal Responsibility Education Program in California. We conducted a secondary analysis of survey data collected from youth before participation in California's Personal Responsibility Education Program. Bivariate and multivariate analyses were conducted for a sample of 4,614 females ages 14-18 years to compare awareness and use of family planning services between participants at rural and urban program sites, controlling for the program setting and participant demographic, sexual, and reproductive characteristics. Overall, 61% of participants had heard of a family planning provider in their community, and 24% had visited a family planning provider. Awareness and use of family planning services were lower among rural participants than urban participants. After adjusting for the program setting and participant characteristics, rural participants were less likely to know about a family planning provider in their community (odds ratio, .64; 95% confidence interval, .50-.81) or receive family planning services (odds ratio, .76; 95% confidence interval, .58-.99) than urban participants. Findings suggest that adolescents in rural areas face greater barriers to accessing family planning services than adolescents in urban areas. Targeted efforts to increase awareness and use of family planning services among adolescents in rural areas and among other underserved populations are needed. Copyright © 2016 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  4. BLM Density Management and Riparian Buffer Study: Establishment Report and Study Plan

    USGS Publications Warehouse

    Cissel, John H.; Anderson, P.D.; Olson, Deanna H.; Puettmann, Klaus; Berryman, Shanti; Chan, Samuel; Thompson, Charley

    2006-01-01

    The Bureau of Land Management (BLM), Pacific Northwest Research Station (PNW), U.S. Geological Survey (USGS), and Oregon State University (OSU) established the BLM Density Management and Riparian Buffer Study (DMS) in 1994 to demonstrate and test options for young stand management to meet Northwest Forest Plan objectives in western Oregon. The primary objectives of the DMS are to evaluate the effects of alternative forest density management treatments in young stands on the development of important late-successional forest habitat attributes and to assess the combined effects of density management and alternative riparian buffer widths on aquatic and riparian ecosystems. The DMS consists of three integrated studies: initial thinning, rethinning, and riparian buffer widths. The initial thinning study was installed in 50- to 80-year-old stands that had never been commercially thinned. Four stand treatments of 30-60 acres each were established at each of seven study sites: (1) unthinned control, (2) high density retention [120 trees per acre (TPA)], (3) moderate density retention (80 TPA), and (4) variable density retention (40-120 TPA). Small (1/4 to 1 acre in size) leave islands were included in all treatments except the control, and small patch cuts (1/4 to 1 acre in size) were included in the moderate and variable density treatments. An eighth site, Callahan Creek, contains a partial implementation of the study design. The rethinning study was installed in four 70- to 90-year-old stands that previously had been commercially thinned. Each study stand was split into two parts: one part as an untreated control and the other part as a rethinning (30-60 TPA). The riparian buffer study was nested within the moderate density retention treatment at each of the eight initial thinning study sites and two rethinning sites. Alternative riparian buffer widths included: (1) streamside retention (one tree canopy width, or 20-25 feet), (2) variable width (follows topographic and vegetative breaks, 50 feet slope distance minimum), (3) one full site-potential tree height (approximately 220 feet), and (4) two full tree heights (approximately 440 feet). A second round of density management manipulations are now being planned for implementation beginning in 2009. Stem density will be reduced in the high, moderate, and variable density treatments and most existing riparian buffers, leave islands, and patch cuts will remain in place. Remeasurement, data management, and analysis are ongoing for three long-term, core components of the DMS: vegetation, microclimate, and aquatic vertebrates. In addition, several short-term collaborative studies have been completed on these sites, including leave island effectiveness as refugia, treatment response of terrestrial and aquatic arthropods, and smaller-scale studies of fungal, lichen, and bryophyte community response. Additional collaborative studies are encouraged on DMS sites.

  5. Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-05-01

    Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate andmore » recommend corrective action alternatives.« less

  6. 12. "SITE PLAN." Test Area 1100. Specifications No. OC35973; Drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. "SITE PLAN." Test Area 1-100. Specifications No. OC359-73; Drawing No. 5841-C-1; D.O. SERIES AW1525/7 Rev. A. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA

  7. Livermore Site Spill Prevention, Control, and Countermeasures Plan, May 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.; Mertesdorf, E.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil.

  8. Annual Reports Regarding Progress in Developing a Dredged Material Management Plan for the Long Island Sound Region

    EPA Pesticide Factsheets

    The site designation for the Western and Central Long Island Sound disposal sites requires the completion of a Dredged Material Management Plan (DMMP) and EPA to conduct an annual review of progress toward completion of the DMMP.

  9. NHEERL CONTAMINATED SEDIMENT RESEARCH MULTI-YEAR IMPLEMENTATION PLAN (2005)

    EPA Science Inventory

    ORD has developed a multi-year plan (MYP) called the Contaminated Sites MYP to address the research needs of EPA's Office of Superfund Remediation and Technology Innovation (OSRTI). One of the long-term goals of the Contaminated Sites MYP relates to contaminated sediments, and t...

  10. Distributed query plan generation using multiobjective genetic algorithm.

    PubMed

    Panicker, Shina; Kumar, T V Vijay

    2014-01-01

    A distributed query processing strategy, which is a key performance determinant in accessing distributed databases, aims to minimize the total query processing cost. One way to achieve this is by generating efficient distributed query plans that involve fewer sites for processing a query. In the case of distributed relational databases, the number of possible query plans increases exponentially with respect to the number of relations accessed by the query and the number of sites where these relations reside. Consequently, computing optimal distributed query plans becomes a complex problem. This distributed query plan generation (DQPG) problem has already been addressed using single objective genetic algorithm, where the objective is to minimize the total query processing cost comprising the local processing cost (LPC) and the site-to-site communication cost (CC). In this paper, this DQPG problem is formulated and solved as a biobjective optimization problem with the two objectives being minimize total LPC and minimize total CC. These objectives are simultaneously optimized using a multiobjective genetic algorithm NSGA-II. Experimental comparison of the proposed NSGA-II based DQPG algorithm with the single objective genetic algorithm shows that the former performs comparatively better and converges quickly towards optimal solutions for an observed crossover and mutation probability.

  11. Distributed Query Plan Generation Using Multiobjective Genetic Algorithm

    PubMed Central

    Panicker, Shina; Vijay Kumar, T. V.

    2014-01-01

    A distributed query processing strategy, which is a key performance determinant in accessing distributed databases, aims to minimize the total query processing cost. One way to achieve this is by generating efficient distributed query plans that involve fewer sites for processing a query. In the case of distributed relational databases, the number of possible query plans increases exponentially with respect to the number of relations accessed by the query and the number of sites where these relations reside. Consequently, computing optimal distributed query plans becomes a complex problem. This distributed query plan generation (DQPG) problem has already been addressed using single objective genetic algorithm, where the objective is to minimize the total query processing cost comprising the local processing cost (LPC) and the site-to-site communication cost (CC). In this paper, this DQPG problem is formulated and solved as a biobjective optimization problem with the two objectives being minimize total LPC and minimize total CC. These objectives are simultaneously optimized using a multiobjective genetic algorithm NSGA-II. Experimental comparison of the proposed NSGA-II based DQPG algorithm with the single objective genetic algorithm shows that the former performs comparatively better and converges quickly towards optimal solutions for an observed crossover and mutation probability. PMID:24963513

  12. Industry Studies 2002: Construction

    DTIC Science & Technology

    2002-01-01

    Jacksonville, FL Rotary Club of San Juan, San Juan, PR Tren Urbano Subway Project, San Juan, PR U.S. Army South, San Juan, PR U.S. Coast Guard Housing Project...Bechtel Corporation (IBM Plant Construction Site), Shanghai American Chamber of Commerce, Shanghai Urban Planning Exhibit, Shanghai 3 INTRODUCTION The...of states have or are working on a statewide or agency-wide privatization plan , including California, Maryland, Massachusetts, Michigan and

  13. From theory to application: using performance measures for contraceptive care in the Title X family planning program.

    PubMed

    Loyola Briceno, Ana Carolina; Kawatu, Jennifer; Saul, Katie; DeAngelis, Katie; Frederiksen, Brittni; Moskosky, Susan B; Gavin, Lorrie

    2017-09-01

    The objective was to describe a Performance Measure Learning Collaborative (PMLC) designed to help Title X family planning grantees use new clinical performance measures for contraceptive care. Twelve Title X grantee-service site teams participated in an 8-month PMLC from November 2015 to June 2016; baseline was assessed in October 2015. Each team documented their selected best practices and strategies to improve performance, and calculated the contraceptive care performance measures at baseline and for each of the subsequent 8 months. PMLC sites implemented a mix of best practices: (a) ensuring access to a broad range of methods (n=7 sites), (b) supporting women through client-centered counseling and reproductive life planning (n=8 sites), (c) developing systems for same-day provision of all methods (n=10 sites) and (d) utilizing diverse payment options to reduce cost as a barrier (n=4 sites). Ten sites (83%) observed an increase in the clinical performance measures focused on most and moderately effective methods (MME), with a median percent change of 6% for MME (from a median of 73% at baseline to 77% post-PMLC). Evidence suggests that the PMLC model is an approach that can be used to improve the quality of contraceptive care offered to clients in some settings. Further replication of the PMLC among other groups and beyond the Title X network will help strengthen the current model through lessons learned. Using the performance measures in the context of a learning collaborative may be a useful strategy for other programs (e.g., Federally Qualified Health Centers, Medicaid, private health plans) that provide contraceptive care. Expanded use of the measures may help increase access to contraceptive care to achieve national goals for family planning. Published by Elsevier Inc.

  14. Directly Improving the Quality of Radiation Treatment Through Peer Review: A Cross-sectional Analysis of Cancer Centers Across a Provincial Cancer Program.

    PubMed

    Rouette, Julie; Gutierrez, Eric; O'Donnell, Jennifer; Reddeman, Lindsay; Hart, Margaret; Foxcroft, Sophie; Mitera, Gunita; Warde, Padraig; Brundage, Michael D

    2017-07-01

    To describe the outcomes of peer review across all 14 cancer centers in Ontario. We identified all peer-reviewed, curative treatment plans delivered in Ontario within a 3-month study period from 2013 to 2014 using a provincial cancer treatment database and collected additional data on the peer-review outcomes. Considerable variation was found in the proportion of peer-reviewed plans across the centers (average 70.2%, range 40.8%-99.2%). During the study period, 5561 curative plans underwent peer review. Of those, 184 plans (3.3%) had changes recommended. Of the 184 plans, the changes were major (defined as requiring repeat planning or having a major effect on planning or clinical outcomes, or both) in 40.2% and minor in 47.8%. For the remaining 12.0%, data were missing. The proportions of recommended changes varied among disease sites (0.0%-7.0%). The disease sites with the most recommended changes to treatment plans after peer review and with the greatest potential for benefit were the esophagus (7.0%), uterus (6.7%), upper limb (6.3%), cervix and lower limb (both 6.0%), head and neck and bilateral lung (both 5.9%), right supraclavicular lymph nodes (5.7%), rectum (5.3%), and spine (5.0%). Although the heart is an organ at risk in left-sided breast treatment plans, the proportions of recommended changes did not significantly differ between the left breast treatment plans (3.0%, 95% confidence interval 2.0%-4.5%) and right breast treatment plans (2.4%, 95% confidence interval 1.5%-3.8%). The recommended changes were more frequently made when peer review occurred before radiation therapy (3.8%) than during treatment (1.4%-2.8%; P=.0048). The proportion of plans with recommended changes was not significantly associated with patient volume (P=.23), peer-review performance (P=.36), or center academic status (P=.75). Peer review of treatment plans directly affects the quality of care by identifying important clinical and planning changes. Provincial strategies are underway to optimize its conduct in radiation oncology. Copyright © 2016. Published by Elsevier Inc.

  15. Handling the difficult Brownfields issues: A case study of privately funded remediation to residential standards update 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McLeod, D.P.; Ridley, A.P.

    Most Brownfields projects are based on either direct or indirect government funding. This paper describes a more unusual scenario: the remediation of a contaminated industrial site for re-use as residential property. Using the ASTM RBCA risk assessment methodology and an innovative fixed fee arrangement between Woodward-Clyde Consultants and the site owner, they developed and successfully implemented a plan to clean up the site to residential standards over a twelve (12) month time period.

  16. Three-Dimensional Implant Positioning with a Piezosurgery Implant Site Preparation Technique and an Intraoral Surgical Navigation System: Case Report.

    PubMed

    Pellegrino, Gerardo; Taraschi, Valerio; Vercellotti, Tomaso; Ben-Nissan, Besim; Marchetti, Claudio

    This case report describes new implant site preparation techniques joining the benefits of using an intraoral navigation system to optimize three-dimensional implant site positioning in combination with an ultrasonic osteotomy. A report of five patients is presented, and the implant positions as planned in the navigation software with the postoperative scan image were compared. The preliminary results are useful, although further clinical studies with larger populations are needed to confirm these findings.

  17. Space-planning and structural solutions of low-rise buildings: Optimal selection methods

    NASA Astrophysics Data System (ADS)

    Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander

    2017-11-01

    The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.

  18. DAG telescope site studies and infrastructure for possible international co-operations

    NASA Astrophysics Data System (ADS)

    Yerli, Sinan K.; Yeşilyaprak, Cahit; Keskin, Onur; Alis, Sinan

    2016-07-01

    The selected site for the 4 m DAG (Eastern Anatolian Observatory in Turkish) telescope is at "Karakaya Ridge", at 3170 m altitude (3150 m after summit management). The telescope's optical design is performed by the DAG technical team to allow infrared observation at high angular resolution, with its adaptive optics system to be built in Turkey. In this paper; a brief introduction about DAG telescope design; planned instrumentation; the meteorological data collected from 2008, clear night counts, short-term DIMM observations; current infrastructure to hold auxiliary telescopes; auxiliary buildings to assist operations; the observatory design; and coating unit plans will be presented along with possible collaboration possibilities in terms of instrumentation and science programs.

  19. Assessing the feasibility of the Effectiveness of Discontinuing Bisphosphonates trial: a pilot study.

    PubMed

    Wright, N C; Foster, P J; Mudano, A S; Melnick, J A; Lewiecki, M E; Shergy, W J; Curtis, J R; Cutter, G R; Danila, M I; Kilgore, M L; Lewis, E C; Morgan, S L; Redden, D T; Warriner, A H; Saag, K G

    2017-08-01

    The Effectiveness of Discontinuing Bisphosphonates (EDGE) study is a planned pragmatic clinical trial to guide "drug holiday" clinical decision making. This pilot study assessed work flow and feasibility of such a study. While participant recruitment and treatment adherence were suboptimal, administrative procedures were generally feasible and minimally disrupted clinic flow. The comparative effectiveness of continuing or discontinuing long-term alendronate (ALN) on fractures is unknown. A large pragmatic ALN discontinuation study has potential to answer this question. We conducted a 6-month pilot study of the planned the EDGE study among current long-term ALN users (women aged ≥65 with ≥3 years of ALN use) to determine study work flow and feasibility including evaluating the administrative aspects of trial conduct (e.g., time to contract, institutional review board (IRB) approval), assessing rates of site and participant recruitment, and evaluating post-randomization outcomes, including adherence, bisphosphonate-associated adverse events, and participant and site satisfaction. We assessed outcomes 1 and 6 months after randomization. Nine sites participated, including seven community-based medical practices and two academic medical centers. On average (SD), contract execution took 3.4 (2.3) months and IRB approval took 13.9 (4.1) days. Sites recruited 27 participants (13 to continue ALN and 14 to discontinue ALN). Over follow-up, 22% of participants did not adhere to their randomization assignment: 30.8% in the continuation arm and 14.3% in the discontinuation arm. No fractures or adverse events were reported. Sites reported no issues regarding work flow, and participants were highly satisfied with the study. Administrative procedures of the EDGE study were generally feasible, with minimal disruption to clinic flow. In this convenience sample, participant recruitment was suboptimal across most practice sites. Accounting for low treatment arm adherence, a comprehensive recruitment approach will be needed to effectively achieve the scientific goals of the EDGE study.

  20. Japan contribution to studies of low-latitude and equatorial ionosphere over Southeast Asia

    NASA Astrophysics Data System (ADS)

    Yamamoto, M.; Ishii, M.; Otsuka, Y.; Shiokawa, K.; Saito, A.; Tsuda, T.; Fukao, S.

    2008-12-01

    A dense observation network to study ionosphere is deployed over Southeast Asian countries of Indonesia, Thailand, and Vietnam. The Equatorial Atmosphere Radar (EAR) at Kototabang, Indonesia is the center facility, and supporting instruments, i.e., an ionosonde, a VHF ionosphere radar, an optical imager, a GPS scintillation receiver, a magnetometer, a meteor radar, etc. are collocated. NICT operates the ionosonde network SEALION (South East Asian Low-latitude IOnosonde Network) that meridionally extends from the EAR site to Chumphong and Chiang Mai in Thailand, and two more sites (Baq Liu and Phy Thuy) in Vietnam. Additional facilities are an MF radar at Pameungpeuk, Indonesia, and an optical imager at Darwin, Australia. We have been observing plasma bubbles since 2001, that, for example, contributed clarification of time- spatial structures of the phenomena, their relationship to the pre-reversal enhancement, control of bubble occurrence by the meridional winds, etc. We are starting studies of their seeding by means of atmospheric waves that propages from the lower atmosphere, too. In 2008, Nagoya University will soon install three Fabry-Perot interferometers at the EAR site, Chiang Mai, and Darwin. We also have a plan to install digital beacon receivers in some of these sites. Next research program that follows CPEA (Coupling Processes in the Equatorial Atmosphere, 2001-2007) is under planning now. Our main facilities cover ± 10° of geomagnetic latitude, where the magnetic declination is relatively small, and the geomagnetic equator is in the geographic northern hemisphere. We will review our achievements, and show on-going efforts and future plans. Collaboration with the C/NOFS satellite, and comparisons to results from the American sector should be beneficial for global-scale understanding of the equatorial ionosphere/atmosphere.

  1. Airborne precursor missions in support of SIR-C/X-SAR

    NASA Technical Reports Server (NTRS)

    Evans, D.; Oettl, H.; Pampaloni, P.

    1991-01-01

    The NASA DC-8 and DLR E-SAR airborne imaging radars have been deployed over several sites in Europe and the U.S. in support of SIR-C/X-SAR (Shuttle Imaging Radar-C/X-Synthetic Aperture Radar) science team investigations. To date, data have been acquired in support of studies of alpine glaciers, forests, geology, oceanography, and calibration. An experimental campaign with airborne sensors will take place in Europe in June to July 1991 which will allow multitemporal surveys of several Europeans sites. Current plans are for calibration and ecology experiments to be undertaken in Germany, the Netherlands, Italy, France, and the United Kingdom. Coordinated multitemporal aircraft and ground campaigns are planned in support of hydrology experiments in Italy, the United Kingdom, and Austria. Data will also be acquired in support of oceanogrqhy in the Gulf of Genova, North Atlantic, Straits of Messina and the North Sea. Geology sites will include Campi Flegrei and Vesuvio, Italy.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, B.E.; Krajewski, S.A.; Ahner, P.F.

    The site qualification program for the North Knobs UCG site near Rawlins, Wyoming has been completed. This site will be the location for the field tests of Underground Coal Gasification of Steeply Dipping Beds undertaken by Gulf Research and Development Company for DOE in a cost shared contract. Site characterization included a comprehensive geotechnical analysis along with vegetation, historical, and archeological studies. The G coal seam chosen for these tests is a subbituminous B coal with a true seam thickness of 22 feet and has thin coal benches above and below the main seam. The water table is at 90more » feet below the surface. Hydrologic studies have defined the seam as an aquiclude (non-aquifer). The site is deemed restorable to regulatory requirements. Evaluation of this site indicates total acceptability for the three-test program planned by GR and DC.« less

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, B.E.; Krajewski, S.A.; Ahner, P.F.

    The site qualification program for the North Knobs UCG site near Rawlins, Wyoming has been completed. This site will be the location for the field tests of Underground Coal Gasification of Steeply Dipping Beds undertaken by Gulf Research and Development Company for DOE in a cost shared contract. Site characterization included a comprehensive geotechnical analysis along with vegetation, historical, and archeological studies. The G coal seam chosen for these tests is a subbituminous B coal with a true seam thickness of 22 feet and has thin coal benches above and below the main seam. The water table is at 90more » feet below the surface. Hydrologic studies have defined the seam as an aquiclude (nonaquifer). The site is deemed restorable to regulatory requirements. Evaluation of this site indicates total acceptability for the three-test program planned by GR and DC.« less

  4. EPA Begins Reviews of 24 New England Site Cleanups during Current Fiscal Year

    EPA Pesticide Factsheets

    EPA plans to conduct comprehensive reviews of site cleanups at 24 National Priorities List Sites (Superfund Sites), including two Federal Facilities, across New England by performing required Five-Year Reviews of sites.

  5. Commercial Space Port Planning in Texas

    NASA Astrophysics Data System (ADS)

    Bell, L.; Looke, B.

    2002-01-01

    The Texas Legislature is providing funding to support research and planning activities aimed at creating a commercial spaceport in the state. These monies have been allocated to regional Spaceport Development Corporations that have been established in three countries containing candidate site locations: Willacy County (in South Texas); Brazoria County (East Texas); and Pecos County (West Texas). This program is being sponsored and coordinated by the Texas Aerospace Commission (TAC). The Sasakawa International Center for Space Architecture (SICSA) at the University of Houston is providing research, planning and design support to TAC and is a member of each of the three regional development teams. Planning must carefully consider special support requirements and operational characteristics of all prospective launch systems along with geographic, infrastructure and environmental factors at each site. Two of the candidate sites are in coastal areas; a priority for certain launch service providers; whereas the third inland site is more attractive to others. Candidate launch systems include winged horizontal takeoff air-launch vehicles, vertical multi-stage reusable launch vehicles, and expendable sub-orbital surrounding rockets. Important research and planning activities include environmental impact assessments, analyses of overflight hazards, investigations of economic impacts and business plan development. The results of these activities will guide master plan development for each site, including: a physical plan (site layout, infrastructure improvements and facility construction); and a strategic plan (user agreements, licenses, finance sources and participants). Commercial spaceport development demands compliance with stringent FAA regulations established by the Office of Commercial Space Transportation (OCST) which exceed minimum standards allowed for U.S. Government spaceport facilities. Key among these requirements are 15,000 ft. radius on-site clear zones separating launch areas form inhabited facilities, and extremely conservative flight risk restrictions associated with launch trajectories over populated areas. Unless modified, the flight risk criteria currently mandated will prevent virtually all new U.S. commercial spaceport operating license proposals from being approved. Commercial spaceport development also presents significant financing challenges. New launch service companies typically lack substantial economic resources needed for infrastructure construction such as long horizontal runways, launch platforms and vehicle assembly and payload integration facilities. Outside investment sources much be identified, with supplementary revenues potentially derived from space tourism and ancillary public service uses. Texas spaceport planning sponsors, participants and advocates recognize that such a development warrants the necessary investment. It will support the advancement and services of new generations of launch systems vitally needed to reduce the high costs of space access. It will afford new state-wide, regional and local economic development opportunities that promote business investments, create jobs and expand infrastructure resources. It will also support a wide spectrum of educational objectives by including and serving academic programs at all levels. Regardless which site is ultimately selected, all Texas regions and public interests in general will benefit.

  6. Final consolidated action plan to Tiger Team. Volume 1, Change 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficiencies identified by the Tiger Teams. A thirdmore » purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico and California sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less

  7. Final consolidated action plan to Tiger Team. Volume 2, Change 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    Two separate Tiger Team assessments were conducted at Sandia National Laboratories (SNL). The first was conducted at the California site in Livermore between April 30, 1990, and May 18, 1990. A second Tiger Team assessment was conducted at the New Mexico site in Albuquerque between April 15 and May 24, 1991. This report is volume two, change one. One purpose of this Action Plan is to provide a formal written response to each of the findings and/or concerns cited in the SNL Tiger Team assessment reports. A second purpose is to present actions planned to be conducted to eliminate deficienciesmore » identified by the Tiger Teams. A third purpose is to consolidate (group) related findings and to identify priorities assigned to the planned actions for improved efficiency and enhanced management of the tasks. A fourth and final purpose is to merge the two original SNL Action Plans for the New Mexico [Ref. a] and California [Ref. b] sites into a single Action Plan as a major step toward managing all SNL ES&H activities more similarly. Included in this combined SNL Action Plan are descriptions of the actions to be taken by SNL to liminate all problems identified in the Tiger Teams` findings/concerns, as well as estimated costs and schedules for planned actions.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Dick; Tsosie, Bernadette

    Groundwater samples were collected from monitoring wells at the Bluewater, New Mexico, Disposal Site to monitor groundwater contaminants as specified in the 1997 Long-Term Surveillance Plan for the DOE Bluewater (UMTRCA Title II) Disposal Site Near Grants, New Mexico (LTSP). Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). A duplicate sample was collected from location 16(SG).

  9. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  10. 30 CFR 585.605 - What is a Site Assessment Plan (SAP)?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... lease, including your project easement, or to test technology devices. (1) Your SAP must describe how... Section 585.605 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE... Information Requirements Site Assessment Plan and Information Requirements for Commercial Leases § 585.605...

  11. 30 CFR 585.605 - What is a Site Assessment Plan (SAP)?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... lease, including your project easement, or to test technology devices. (1) Your SAP must describe how... Section 585.605 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE... Information Requirements Site Assessment Plan and Information Requirements for Commercial Leases § 585.605...

  12. 30 CFR 585.605 - What is a Site Assessment Plan (SAP)?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... lease, including your project easement, or to test technology devices. (1) Your SAP must describe how... Section 585.605 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE... Information Requirements Site Assessment Plan and Information Requirements for Commercial Leases § 585.605...

  13. March 2016 Memo: Planning for Removal and Remedial Activities at Hardrock Mining and Mineral Processing Sites with Fluid Hazards

    EPA Pesticide Factsheets

    Memo from EPA Assistant Administrator Mathy Stanislaus, regarding planning for removal and remedial activities at hardrock mining and mineral processing sites with fluid hazards, and to share the Agency’s expectations for the work that is done at these sit

  14. 1. Photocopy of site plan, Dene Hendrick, delineator, 1977, for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photocopy of site plan, Dene Hendrick, delineator, 1977, for the City of San Jose in cooperative agreement with the California Department of Transportation (from the San Jose Historical Museum). - Twin Oaks Dairy, Northwest of Metcalfe Road, off State Route 101 (Monterey Road), Coyote, Santa Clara County, CA

  15. 76 FR 76118 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... and Hazardous Substances Pollution Contingency Plan; National Priorities List: Notice of Intent for Deletion of the State Marine of Port Arthur Superfund Site AGENCY: Environmental Protection Agency. ACTION... Delete the State Marine of Port Arthur (SMPA) Superfund Site located in Port Arthur, Texas, from the...

  16. Savannah River Site Approved Site Treatment Plan, 2001 Annual Update (Volumes I and II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, B.

    2001-04-30

    The Compliance Plan Volume (Volume I) identifies project activity scheduled milestones for achieving compliance with Land Disposal Restrictions. Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  17. Comment and response document for the long-term surveillance plan for the Bodo Canyon Disposal Site, Durango. Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    This document contains comments made by the US Nuclear Regulatory Commission upon their review of the Long-Term Surveillance Plan for the Bodo Canyon Disposal Site, Durango, Colorado. Responses to the comments are also included in the document.

  18. Low-Impact Development Design—Integrating Suitability Analysis and Site Planning For Reduction Of Post-Development Stormwater Quantity

    EPA Science Inventory

    A land-suitability analysis (LSA) was integrated with open-space conservation principles, based on watershed physiographic and soil characteristics, to derive a low-impact development (LID) residential plan for a three hectare site in Coshocton OH, USA. The curve number method wa...

  19. Campus on the Hill.

    ERIC Educational Resources Information Center

    Martin, Frank Edgerton

    2002-01-01

    Details the University of Cincinnati's campus master plan, designed to overcome deans'"fiefdoms" and make the best use of the limited remaining open space. Three imperatives shaped the plan: siting new buildings to infill the campus fabric rather than taking open space, siting buildings to shape outdoor spaces, and weaving open spaces as…

  20. 75 FR 59983 - National Priorities List, Final Rule-Newtown Creek

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... Contingency Plan (``NCP'') include a list of national priorities among the known releases or threatened... National Oil and Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR part 300, on July 16... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...

  1. 75 FR 9790 - National Priorities List, Final Rule-Gowanus Canal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-04

    ... Contingency Plan (``NCP'') include a list of national priorities among the known releases or threatened... National Oil and Hazardous Substances Pollution Contingency Plan (``NCP''), 40 CFR part 300, on July 16... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...

  2. 40 CFR 63.1285 - Reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the owner or operator is requested by the Administrator to conduct a performance evaluation for a... requested by the Administrator, a site-specific test plan is not required by this subpart. If requested by the Administrator, the owner or operator must also submit the site-specific test plan required by § 63...

  3. 40 CFR 63.775 - Reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the owner or operator is required by the Administrator to conduct a performance evaluation for a... requested by the Administrator, a site-specific test plan is not required by this subpart. If requested by the Administrator, the owner or operator must also submit the site-specific test plan required by § 63...

  4. A new metric for assessing IMRT modulation complexity and plan deliverability.

    PubMed

    McNiven, Andrea L; Sharpe, Michael B; Purdie, Thomas G

    2010-02-01

    To evaluate the utility of a new complexity metric, the modulation complexity score (MCS), in the treatment planning and quality assurance processes and to evaluate the relationship of the metric with deliverability. A multisite (breast, rectum, prostate, prostate bed, lung, and head and neck) and site-specific (lung) dosimetric evaluation has been completed. The MCS was calculated for each beam and the overall treatment plan. A 2D diode array (MapCHECK, Sun Nuclear, Melbourne, FL) was used to acquire measurements for each beam. The measured and planned dose (PINNACLE3, Phillips, Madison, WI) was evaluated using different percent differences and distance to agreement (DTA) criteria (3%/ 3 mm and 2%/ 1 mm) and the relationship between the dosimetric results and complexity (as measured by the MCS or simple beam parameters) assessed. For the multisite analysis (243 plans total), the mean MCS scores for each treatment site were breast (0.92), rectum (0.858), prostate (0.837), prostate bed (0.652), lung (0.631), and head and neck (0.356). The MCS allowed for compilation of treatment site-specific statistics, which is useful for comparing different techniques, as well as for comparison of individual treatment plans with the typical complexity levels. For the six plans selected for dosimetry, the average diode percent pass rate was 98.7% (minimum of 96%) for 3%/3 mm evaluation criteria. The average difference in absolute dose measurement between the planned and measured dose was 1.7 cGy. The detailed lung analysis also showed excellent agreement between the measured and planned dose, as all beams had a diode percentage pass rate for 3%/3 mm criteria of greater than 95.9%, with an average pass rate of 99.0%. The average absolute maximum dose difference for the lung plans was 0.7 cGy. There was no direct correlation between the MCS and simple beam parameters which could be used as a surrogate for complexity level (i.e., number of segments or MU). An evaluation criterion of 2%/ 1 mm reliably allowed for the identification of beams that are dosimetrically robust. In this study we defined a robust beam or plan as one that maintained a diode percentage pass rate greater than 90% at 2%/ 1 mm, indicating delivery that was deemed accurate when compared to the planned dose, even under stricter evaluation criterion. MCS and MU threshold criteria were determined by defining a required specificity of 1.0. A MCS threshold of 0.8 allowed for identification of robust deliverability with a sensitivity of 0.36. In contrast, MU had a lower sensitivity of 0.23 for a threshold of 50 MU. The MCS allows for a quantitative assessment of plan complexity, on a fixed scale, that can be applied to all treatment sites and can provide more information related to dose delivery than simple beam parameters. This could prove useful throughout the entire treatment planning and QA process.

  5. Comprehensive facilities plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less

  6. Speciation and Attenuation of Arsenic and Selenium at Coal Combustion By-Product Management Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Ladwig; B. Hensel; D. Wallschlager

    2005-10-18

    Following completion of contracting activities, sites were identified for the field leachate characterization study. Sampling and Analyses Plans (SAPs) and Site Access Agreements (SAAs) were developed for each site. A total of ten sites were sampled during this reporting period. Among the trace constituents, boron, silicon, and strontium were present in highest concentrations, with median values above 1 mg/L (1,000 {micro}g/L). Work on the first of three sites for the detailed arsenic and selenium adsorption studies began in 2002, prior to completion of the final DOE award. Kd values ranged from 100 to 12,000 L/kg for arsenic (V), 15 tomore » 160 L.kg for As(III), and 5 to 25 L/kg for Se(VI).« less

  7. Advance care planning in a community setting.

    PubMed

    Connolly, Josaleen; Milligan, Stuart; Stevens, Elaine; Jackson, Susan; Rooney, Kevin

    2015-02-10

    To evaluate the effects of implementing an advance care planning process within pilot sites in North Ayrshire in 2010, focusing on people with palliative care needs. Data were collected from participants in advance care planning training using a questionnaire. Semi-structured interviews were conducted and an audit of documentation was undertaken. Thirty nine questionnaires were returned, a response rate of 16%. Twenty four out of 25 (96%) participants rated the training as having improved their understanding of the advance care planning process. The general consensus in interviews was that advance care planning is a worthwhile process. Participants reported patients achieving their preferred place of end of life care and greater consultation regarding hospitalisation. Within the pilot sites, advance care planning training enhanced the ability of professionals to implement the advance care planning process and record the wishes of patients and residents.

  8. 19. Photographic copy of an asconstructed site plan for additions ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of an as-constructed site plan for additions to North Base: Job No. Muroc A(511), Military Construction, Third District Region, San Bernardino, California; Muroc Bombing Range, Muroc Lake, Calif; Additional Temporary Construction, Materiel Center Flight Test Base, Location Grading & Paving Plan, Sheet No. 1 of 21, March 1943. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA

  9. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less

  10. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 2, Geology report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    Detailed investigations of geologic, geomorphic, and seismic conditions at the Bodo Canyon disposal site were conducted. The purpose of these investigations was basic site characterization and identification of potential geologic hazards that could affect long-term site stability. Subsequent engineering studies, such as analyses of hydrologic and liquefaction hazards, used the data developed in these studies. The geomorphic analysis was employed in the design of effective erosion protection. Studies of the regional and local seismotectonic setting, which included a detailed search for possible capable faults within a 65 kilometer radius of the site, provided the basis for seismic design parameters. Themore » scope of work performed included the following: Compilation and analysis of previous published and unpublished geologic literature and maps; Review of historical and instrumental earthquake data; Review of site-specific subsurface geologic data, including lithologic and geophysical logs of exploratory boreholes advanced in the site area; Photogeologic interpretations of existing conventional aerial photographs; and, Ground reconnaissance and mapping of the site region.« less

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  12. 40 CFR 1.27 - Offices of the Associate Administrators.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... establishes Agency policy, and approves annual plans and modifications for travel abroad and attendance at.... The Office initiates and conducts on-site field visits to study, analyze, and resolve problems of...

  13. 40 CFR 1.27 - Offices of the Associate Administrators.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... establishes Agency policy, and approves annual plans and modifications for travel abroad and attendance at.... The Office initiates and conducts on-site field visits to study, analyze, and resolve problems of...

  14. 40 CFR 1.27 - Offices of the Associate Administrators.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... establishes Agency policy, and approves annual plans and modifications for travel abroad and attendance at.... The Office initiates and conducts on-site field visits to study, analyze, and resolve problems of...

  15. 40 CFR 1.27 - Offices of the Associate Administrators.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establishes Agency policy, and approves annual plans and modifications for travel abroad and attendance at.... The Office initiates and conducts on-site field visits to study, analyze, and resolve problems of...

  16. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  17. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  18. SAS Code for Calculating Intraclass Correlation Coefficients and Effect Size Benchmarks for Site-Randomized Education Experiments

    ERIC Educational Resources Information Center

    Brandon, Paul R.; Harrison, George M.; Lawton, Brian E.

    2013-01-01

    When evaluators plan site-randomized experiments, they must conduct the appropriate statistical power analyses. These analyses are most likely to be valid when they are based on data from the jurisdictions in which the studies are to be conducted. In this method note, we provide software code, in the form of a SAS macro, for producing statistical…

  19. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  20. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  1. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  2. 7 CFR 1924.105 - Planning/performing development.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for a specific site. Planning must take into consideration topography, soils, climate, adjacent land... changing demands. All planning and performing development work is the responsibility of the applicant or...

  3. Theory and Design Tools For Studies of Reactions to Abrupt Changes in Noise Exposure

    NASA Technical Reports Server (NTRS)

    Fields, James M.; Ehrlich, Gary E.; Zador, Paul; Shepherd, Kevin P. (Technical Monitor)

    2000-01-01

    Study plans, a pre-tested questionnaire, a sample design evaluation tool, a community publicity monitoring plan, and a theoretical framework have been developed to support combined social/acoustical surveys of residents' reactions to an abrupt change in environmental noise, Secondary analyses of more than 20 previous surveys provide estimates of three parameters of a study simulation model; within individual variability, between study wave variability, and between neighborhood variability in response to community noise. The simulation model predicts the precision of the results from social surveys of reactions to noise, including changes in noise. When the study simulation model analyzed the population distribution, noise exposure environments and feasible noise measurement program at a proposed noise change survey site, it was concluded that the site could not yield sufficient precise estimates of human reaction model to justify conducting a survey. Additional secondary analyses determined that noise reactions are affected by the season of the social survey.

  4. Three-dimensional geological modelling of anthropogenic deposits at small urban sites: a case study from Sheepcote Valley, Brighton, UK.

    PubMed

    Tame, C; Cundy, A B; Royse, K R; Smith, M; Moles, N R

    2013-11-15

    Improvements in computing speed and capacity and the increasing collection and digitisation of geological data now allow geoscientists to produce meaningful 3D spatial models of the shallow subsurface in many large urban areas, to predict ground conditions and reduce risk and uncertainty in urban planning. It is not yet clear how useful this 3D modelling approach is at smaller urban scales, where poorly characterised anthropogenic deposits (artificial/made ground and fill) form the dominant subsurface material and where the availability of borehole and other geological data is less comprehensive. This is important as it is these smaller urban sites, with complex site history, which frequently form the focus of urban regeneration and redevelopment schemes. This paper examines the extent to which the 3D modelling approach previously utilised at large urban scales can be extended to smaller less well-characterised urban sites, using a historic landfill site in Sheepcote Valley, Brighton, UK as a case study. Two 3D models were generated and compared using GSI3D™ software, one using borehole data only, one combining borehole data with local geological maps and results from a desk study (involving collation of available site data, including ground contour plans). These models clearly delimit the overall subsurface geology at the site, and allow visualisation and modelling of the anthropogenic deposits present. Shallow geophysical data collected from the site partially validate the 3D modelled data, and can improve GSI3D™ outputs where boundaries of anthropogenic deposits may not be clearly defined by surface, contour or borehole data. Attribution of geotechnical and geochemical properties to the 3D model is problematic without intrusive investigations and sampling. However, combining available borehole data, shallow geophysical methods and site histories may allow attribution of generic fill properties, and consequent reduction of urban development risk and uncertainty. Copyright © 2013 Elsevier Ltd. All rights reserved.

  5. 78 FR 45871 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... components: Hydrogeologic study; Surface water sampling study; Stream biological study; Air quality survey... components: Biological survey; Biota survey; Surface water and sediment characterization; Groundwater... impacted groundwater in three water bearing zones at the Site; the unconsolidated materials zone, the upper...

  6. Landowner Attitudes and Perceptions of Impact from Wind and Natural Gas Development in Northern Pennsylvania: Implications for Energy Landscapes in Rural America

    NASA Astrophysics Data System (ADS)

    Jacquet, Jeffrey Bryan

    Energy developments such as industrial scale wind farms and unconventional natural gas drilling represent some of the largest and most controversial land use changes occurring in the United States today. A diverse array of academic disciplines have each sought to explain the social, psychological, and economic effects of siting large industrial facilities in rural areas, however the research has largely remained discipline-specific. This study measures resident attitudes and perceptions of impact from both wind and gas drilling occurring simultaneously in the Armenia Mountain Area of northern Pennsylvania. The results of a mail survey of landowners (n = 1028) in this study area reveal factors that explain landowner variation in attitudes and perception of impact, and describe new forms of participation in the planning and siting of these energy projects. Direction is provided for a new and synthetic theoretical understanding of how residents perceive these impacts and impacts from land use change. The work advances “risk of social and psychological disruption” as a key factor that may influence how residents respond to the prospect of large land use changes. Implications for the regulation and planning of these energy sources are offered, including a new understanding of how landowners participate in the planning and siting of large energy projects. Finally, the limitations of this work, as well as opportunities and implications for future research, are discussed.

  7. A study to establish reasonable action limits for patient-specific quality assurance in intensity-modulated radiation therapy.

    PubMed

    Both, Stefan; Alecu, Ionut M; Stan, Andrada R; Alecu, Marius; Ciura, Andrei; Hansen, Jeremy M; Alecu, Rodica

    2007-03-07

    An effective patient quality assurance (QA) program for intensity-modulated radiation therapy (IMRT) requires accurate and realistic plan acceptance criteria--that is, action limits. Based on dose measurements performed with a commercially available two-dimensional (2D) diode array, we analyzed 747 fluence maps resulting from a routine patient QA program for IMRT plans. The fluence maps were calculated by three different commercially available (ADAC, CMS, Eclipse) treatment planning systems (TPSs) and were delivered using 6-MV X-ray beams produced by linear accelerators. To establish reasonably achievable and clinically acceptable limits for the dose deviations, the agreement between the measured and calculated fluence maps was evaluated in terms of percent dose error (PDE) for a few points and percent of passing points (PPP) for the isodose distribution. The analysis was conducted for each TPS used in the study (365 ADAC, 162 CMS,220 Eclipse), for multiple treatment sites (prostate, pelvis, head and neck, spine, rectum, anus, lung, brain), at the normalization point for 3% percentage difference (%Diff) and 3-mm distance to agreement (DTA) criteria. We investigated the treatment-site dependency of PPP and PDE. The results show that, at 3% and 3-mm criteria, a 95% PPP and 3% PDE can be achieved for prostate treatments and a 90% PPP and 5% PDE are attainable for any treatment site.

  8. MO-F-CAMPUS-T-03: Continuous Dose Delivery with Gamma Knife Perfexion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ghobadi,; Li, W; Chung, C

    2015-06-15

    Purpose: We propose continuous dose delivery techniques for stereotactic treatments delivered by Gamma Knife Perfexion using inverse treatment planning system that can be applied to various tumour sites in the brain. We test the accuracy of the plans on Perfexion’s planning system (GammaPlan) to ensure the obtained plans are viable. This approach introduces continuous dose delivery for Perefxion, as opposed to the currently employed step-and-shoot approaches, for different tumour sites. Additionally, this is the first realization of automated inverse planning on GammaPlan. Methods: The inverse planning approach is divided into two steps of identifying a quality path inside the target,more » and finding the best collimator composition for the path. To find a path, we select strategic regions inside the target volume and find a path that visits each region exactly once. This path is then passed to a mathematical model which finds the best combination of collimators and their durations. The mathematical model minimizes the dose spillage to the surrounding tissues while ensuring the prescribed dose is delivered to the target(s). Organs-at-risk and their corresponding allowable doses can also be added to the model to protect adjacent organs. Results: We test this approach on various tumour sizes and sites. The quality of the obtained treatment plans are comparable or better than forward plans and inverse plans that use step- and-shoot technique. The conformity indices in the obtained continuous dose delivery plans are similar to those of forward plans while the beam-on time is improved on average (see Table 1 in supporting document). Conclusion: We employ inverse planning for continuous dose delivery in Perfexion for brain tumours. The quality of the obtained plans is similar to forward and inverse plans that use conventional step-and-shoot technique. We tested the inverse plans on GammaPlan to verify clinical relevance. This research was partially supported by Elekta, Sweden (vendor of Gamma Knife Perfexion)« less

  9. China action of "Cleanup Plan for Polychlorinated Biphenyls Burial Sites": emissions during excavation and thermal desorption of a capacitor-burial site.

    PubMed

    Yang, Bing; Zhou, Lingli; Xue, Nandong; Li, Fasheng; Wu, Guanglong; Ding, Qiong; Yan, Yunzhong; Liu, Bo

    2013-10-01

    Scarce data are available so far on emissions in a given scenario for excavation and thermal desorption, a common practice, of soils contaminated with polychlorinated biphenyls (PCBs). As part of China action of "Cleanup Plan for PCBs Burial Sites", this study roughly estimated PCBs emissions in the scenario for a capacitor-burial site. The concentrations of total PCBs (22 congeners) in soils were in the range of 2.1-16,000μg/g with a mean of 2300μg/g, among the same order of magnitude as the highest values obtained in various PCBs-contaminated sites. Only six congeners belonging to Di-, Tri-, and Tetra-CBs were observed above limits of detection in air samples in the scenario, partially which can be estimated by the USEPA air emission model. Comparing concentrations and composition profiles of PCBs in the soil and air samples further indicated a leaked source of commercial PCBs formulations of trichlorobiphenyl (China PCB no. 1). The measures taken if any to mitigate the volatilization and movement of PCBs and to minimize worker exposure were discussed for improvements of the excavation practice. Copyright © 2013 Elsevier Inc. All rights reserved.

  10. Spent nuclear fuel project high-level information management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less

  11. Multi-Modal Active Perception for Autonomously Selecting Landing Sites on Icy Moons

    NASA Technical Reports Server (NTRS)

    Arora, A.; Furlong, P. M.; Wong, U.; Fong, T.; Sukkarieh, S.

    2017-01-01

    Selecting suitable landing sites is fundamental to achieving many mission objectives in planetary robotic lander missions. However, due to sensing limitations, landing sites which are both safe and scientifically valuable often cannot be determined reliably from orbit, particularly, in icy moon missions where orbital sensing data is noisy and incomplete. This paper presents an active perception approach to Entry Descent and Landing (EDL) which enables the lander to autonomously plan informative descent trajectories, acquire high quality sensing data during descent and exploit this additional information to select higher utility landing sites. Our approach consists of two components: probabilistic modeling of landing site features and approximate trajectory planning using a sampling based planner. The proposed framework allows the lander to plan long horizons paths and remain robust to noisy data. Results in simulated environments show large performance improvements over alternative approaches and show promise that our approach has strong potential to improve science return of not only icy moon missions but EDL systems in general.

  12. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less

  13. Early results from a multi-component French public-private partnership initiative to improve participation in clinical research - CeNGEPS: a prospective before-after study.

    PubMed

    Bordet, Régis; Lang, Marie; Dieu, Christelle; Billon, Nathalie; Duffet, Jean-Pierre

    2015-08-19

    A public-private (51/49 %) partnership was initiated in 2007 in France to improve the attractiveness of French sites in industry-sponsored international clinical trials. This initiative developed and implemented a combination of structuring actions and support actions. Here we report the assessment of the impact after 6 years on participation of French study sites in industry-sponsored clinical trials. We performed a prospective before-after study of clinical research activities in French public hospitals to assess the impact of actions developed and implemented by CeNGEPS. The programme involved a combination of structuring actions (establishment of sites of excellence, national networks and dedicated clinical research assistants (CRAs)), support actions (tools, templates and training) and competitive budget allocation for sites or networks based on performance. The impact was assessed using the following performance criteria: 1) reduction of the delay to contract signature to ≤ 60 days for 80 % of the trial sites; 2) inclusion of ≥80 % of the planned number of patients by at least 80 % of trial sites; 3) closure of <15 % of trials sites without patients enrolled. In 2013, the median delay to contract signature was: 55 days, compared with 76 days in 2008 (27.6 % reduction), 50.5 % of all sites and 58 % of sites with a dedicated CRA included ≥80 % of the planned number of patients compared with 44.8 % in 2008 (12.7 % increase) and 21.3 % of all sites and 9 % of sites with a dedicated CRA closed with no patients included, compared with 26.4 % in 2008 (19.3 and 65.9 %, respectively). These results provide evidence that it is possible to improve a country's attractiveness for industry-sponsored clinical research. The two main actions, i.e. establishing sites of excellence throughout the country with well-trained, dedicated staff and establishing a national network of clinical investigators, could be adapted to other countries in Western Europe to improve Europe's attractiveness to industry-funded trials.

  14. Final Work Plan for CO2 Sparging Proof of Concept Test, LCP Chemical Site

    EPA Pesticide Factsheets

    September 11, 2012 plan to address concerns on a pilot test of carbon dioxide sparging to neutralize pH and reduce the density of the Caustic Brine Pool (CBP) at the LCP Chemicals Superfund Site, GA. Region ID: 04 DocID: 10903388, DocDate: 09-11-2012

  15. 5. Photocopy of site plan drawing, with later amendments dhowing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of site plan drawing, with later amendments dhowing original USFS building shceduled for removal, Annex moved to present location, and addition to Warehouse (from the U.S. Forest Service, Wenatchee National Forest) Date Unkown - U.S. Forest Service Chelan Ranger Station, 428 West Woodin Avenue, Chelan, Chelan County, WA

  16. EPA Extends Comment Period for Proposed Cleanup Plan for the Wells G&H Superfund Site in Woburn Massachusetts

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency has proposed a cleanup plan for the Wells G&H Superfund Site, Southwest Properties, Operable Unit (OU4). The comment period will now be a total of 62 days and be open until September 13, 2017.

  17. Institutional Controls: A Guide to Planning, Implementing, Maintaining, and Enforcing Institutional Controls at Contaminated Sites

    EPA Pesticide Factsheets

    This guide provides information and recommendations that should be useful for planning, implementing, maintaining, and enforcing institutional controls (ICs) for Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, or Superfund); Brownfields; federal facility; underground storage tank (UST); and Resource Conservation and Recovery Act (RCRA) site cleanups.

  18. Guide for Educational Planning of Public School Buildings and Sites in Minnesota. Revised.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Administration, St. Paul. Documents Section.

    This guide serves as a manual for Minnesota school boards, administrators, architects, engineers, and others engaged in developing school plant programs. Part I considers State and local responsibilities in school plant planning procedures; Part II deals with site selection and the requirements for elementary, secondary, service, central, and…

  19. 14 CFR Appendix E to Part 420 - Tables for Explosive Site Plan

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Tables for Explosive Site Plan E Appendix E to Part 420 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION...*(ln(d))3] Table E-8—Separation Distance Criteria for Storage of Liquid Hydrogen and Bulk Quantities of...

  20. 14 CFR Appendix E to Part 420 - Tables for Explosive Site Plan

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Tables for Explosive Site Plan E Appendix E to Part 420 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION...*(ln(d))3] Table E-8—Separation Distance Criteria for Storage of Liquid Hydrogen and Bulk Quantities of...

  1. The promise, practice and state of planning tools to assess site vulnerability to runoff phosphorus loss

    USDA-ARS?s Scientific Manuscript database

    Over the past 20 years, there has been a proliferation of phosphorus (P) site assessment tools for nutrient management planning, particularly in the United State. These decision support tools, range from the P Index to fate-and-transport models to weather-forecast based risk calculators. All require...

  2. Site Characterization Report (Building 202). Volume 2. Appendicies A-H.

    DTIC Science & Technology

    1996-04-01

    Bionetics,Groundwater and Wells, Environmental Science and Engineering, Inc., Installation Assessment of ERADCOM Activities, Environmental Science and...Engineering, Inc., Plan for the Assessment of Contamination at Woodbridge Research Facility, Environmental Science and Engineering, Inc., Remedial...Action Plan for the Woodbridge Research Facility PCB Disposal Site, Environmental Science and Engineering, Inc., Remedial Investigation and

  3. 75 FR 59975 - National Priorities List, Final Rule No. 50

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... Substances Pollution Contingency Plan (``NCP'') include a list of national priorities among the known... Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...

  4. 76 FR 57662 - National Priorities List, Final Rule No. 52

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Substances Pollution Contingency Plan (``NCP'') include a list of national priorities among the known... Contingency Plan (``NCP''), 40 CFR part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105... site. For example, the name ``Jones Co. plant site,'' does not imply that the Jones company is...

  5. Better data, better planning: the College of Emergency Medicine sentinel sites project.

    PubMed

    Moulton, Chris; Mann, Clifford; Tempest, Michelle

    2014-11-01

    This article describes the College of Emergency Medicine's initial attempt to gather high quality data from its own 'sentinel sites' rather than relying on more comprehensive national data of dubious quality. Such information is essential to inform and guide the planning of urgent and emergency care services in the future.

  6. 76 FR 31884 - Reducing Regulatory Burden; Retrospective Review Plans Under E.O. 13563

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... agencies have been posted on the White House Web site at: http://www.slideshare.net/whitehouse/hud-combined... effective and less burdensome in achieving HUD's mission to create strong, sustainable, inclusive... House Web site at: http://www.slideshare.net/whitehouse/hud-combined . The appendix to HUD's plan...

  7. Defining robustness protocols: a method to include and evaluate robustness in clinical plans

    NASA Astrophysics Data System (ADS)

    McGowan, S. E.; Albertini, F.; Thomas, S. J.; Lomax, A. J.

    2015-04-01

    We aim to define a site-specific robustness protocol to be used during the clinical plan evaluation process. Plan robustness of 16 skull base IMPT plans to systematic range and random set-up errors have been retrospectively and systematically analysed. This was determined by calculating the error-bar dose distribution (ebDD) for all the plans and by defining some metrics used to define protocols aiding the plan assessment. Additionally, an example of how to clinically use the defined robustness database is given whereby a plan with sub-optimal brainstem robustness was identified. The advantage of using different beam arrangements to improve the plan robustness was analysed. Using the ebDD it was found range errors had a smaller effect on dose distribution than the corresponding set-up error in a single fraction, and that organs at risk were most robust to the range errors, whereas the target was more robust to set-up errors. A database was created to aid planners in terms of plan robustness aims in these volumes. This resulted in the definition of site-specific robustness protocols. The use of robustness constraints allowed for the identification of a specific patient that may have benefited from a treatment of greater individuality. A new beam arrangement showed to be preferential when balancing conformality and robustness for this case. The ebDD and error-bar volume histogram proved effective in analysing plan robustness. The process of retrospective analysis could be used to establish site-specific robustness planning protocols in proton therapy. These protocols allow the planner to determine plans that, although delivering a dosimetrically adequate dose distribution, have resulted in sub-optimal robustness to these uncertainties. For these cases the use of different beam start conditions may improve the plan robustness to set-up and range uncertainties.

  8. WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the ecological assessment task, Kingfisher Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holt, V.L.; Baron, L.A.

    1994-05-01

    This report provides specific details and requirements for the WAG 2 remedial investigation and site investigation Ecological Assessment Task, Kingfisher Study, including information that will contribute to safe completion of the project. The report includes historical background; a site map; project organization; task descriptions and hazard evaluations; controls; and monitoring, personal protective equipment, decontamination, and medical surveillance program requirements. The report also includes descriptions of site personnel and their certifications as well as suspected WAG 2 contaminants and their characteristics. The primary objective of the WAG 2 Kingfisher Study is to assess the feasibility of using kingfishers as biological monitorsmore » of contaminants on the Oak Ridge Reservation (ORR). Kingfisher sample collection will be used to determine the levels of contaminants and degree of bioaccumulation within a common piscivorous bird feeding on contaminated fish from streams on the ORR.« less

  9. National Weather Service - Strategic Planning and Policy

    Science.gov Websites

    Service Select to go to the NWS homepage Strategic Planning and Policy Site Map News Organization Search button to submit request City, St Go Homepage - Strategic Planning and Policy NWS Strategic Plan Current Plan Archive Policy Issues Public/Private Data Rights International Data Presentations/Tools

  10. Initiatives to Develop Web Sites Including Information about Brownfields Properties

    EPA Pesticide Factsheets

    This web site was created to assist in planning, designing, and operating web sites that include information about individual brownfields properties. The report is of value to parties designing or managing such sites.

  11. Reconnaissance Report. Sedimentation Problem, Quincy Bay, Illinois

    DTIC Science & Technology

    1987-09-01

    are shown on figure 7 of the Fish and Wildife Service’s Planning Aid Report. Area D5 is primarily an agricultural site located within the Indian Grave...and that the placement of dredged material will be permanent. 20 Disposal Site 1 (designated D5 in the Fish and Wildife Service’s Planning Aid Report...provide a more than adequate depth for recreational craft. The U.S. Fish and Wildife Service, in their Planning Aid Report (appendix B), also has

  12. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    This report summarizes the 2012 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. A revised plan is in preparation. The Long-Term Surveillance Plan for the Salmon, Mississippi, Site is intended for release in 2013. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwestmore » of Hattiesburg, Mississippi The State of Mississippi owns the surface real estate subject to certain restrictions related to subsurface penetration. The State is the surface operator; the Mississippi Forestry Commission is its agent. The federal government owns the subsurface real estate (including minerals and some surface features), shares right-of-entry easements with the State, and retains rights related to subsurface monitoring. The U.S. Department of Energy (DOE) Office of Legacy Management (LM), a successor agency to the U.S. Atomic Energy Commission, is responsible for the long-term surveillance of the subsurface real estate« less

  13. The relationship between computed tomography findings and the locations of perforated peptic ulcers: it may provide better information for gastrointestinal surgeons.

    PubMed

    Wang, Shang-Yu; Cheng, Chi-Tung; Liao, Chien-Hung; Fu, Chih-Yuan; Wong, Yon-Cheong; Chen, Huan-Wu; Ouyang, Chun-Hsiang; Kuo, I-Ming; Hsu, Yu-Pao; Yeh, Chun-Nan

    2016-10-01

    Computed tomography (CT) plays an important role in diagnosing gastrointestinal perforation. This study explored the relationship between CT findings and the locations of perforated peptic ulcers (PPUs), which may help further surgical planning. During a 34-month period, 175 patients had CT scans. We categorized those 175 patients into 2 groups: patients with and without a PPU at a difficult ulcer site for a laparoscopic approach. Both clinical data and the CT images were reviewed and analyzed. Based on the univariate analysis results, we conducted multivariate analyses of 3 factors: age, American Society of Anesthesiologists classification of 3 or more, and positive lesser sac image findings. The positive lesser sac findings in CT were the only independent factor that was correlated to the PPU site. Positive lesser sac CT findings may help to predict PPUs in sites where a laparoscopic approach might be difficult. Our study re-evaluates the additional value of CT scanning in diagnosing PPU, and the results may assist with surgical planning in clinical practice. Copyright © 2015 Elsevier Inc. All rights reserved.

  14. Y-12 Site Sustainability Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spencer, Charles G

    2012-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan, while promoting overall sustainability and reduction of greenhouse gas emissions. The mission of the Y-12 Energy Management program is to incorporate energy-effi cient technologies site-wide and to position Y-12 tomore » meet NNSA energy requirement needs through 2025 and beyond. The plan addresses greenhouse gases, buildings, fleet management, water use, pollution prevention, waste reduction, sustainable acquisition, electronic stewardship and data centers, site innovation and government-wide support.« less

  15. [Environmental characterization of the National Contaminated Sites in SENTIERI project].

    PubMed

    Musmeci, L; Bellino, M; Falleni, F; Piccardi, A

    2011-01-01

    The concept of "polluted site" was firstly introduced in Italy with the definition of "environmental high risk areas" (Rule 349/86). Later, the decree 471/99 stated that a site is considered polluted if the concentration of even just one index pollutant in anyone of the matrices (soil or subsoil, surface or ground waters) exceeds the allowable threshold limit concentration. The boundaries of Italian polluted sites (IPS) were defined (Decree 152/06) on the basis of health, environmental and social criteria. SENTIERI Project includes 44 out of the 57 sites comprised in the "National environmental remediation program"; they correspond to the largest national industrial agglomerates. For each site, characterization data were collected, classified and arranged in tables. A great part of collected data came also from the environmental remediation programmes planned for the sites. These plans show that characterization and risk assessment activities were mainly undertaken for private industrial areas, as they were considered source of pollution. On the other hand, municipal and/or green and agricultural areas included in IPSs were poorly studied. Therefore, it is difficult to assess the exposure of the populations living inside and/or near the IPSs. The most probable population exposure come from the contamination of ground waters utilized for irrigation, or industrial emissions. For a description of SENTIERI, refer to the 2010 Supplement of Epidemiology & Prevention devoted to SENTIERI Project.

  16. Planning and design considerations in karst terrain

    NASA Astrophysics Data System (ADS)

    Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.

    1988-10-01

    This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures founded atop cavities can be obtained at this time. Several support schemes which incorporate cavity roof thickness, rock strength, and cavity space are discussed. Possible construction procedures include excavation and dental concrete, grouting, piers or piles to sound rock, or moving to another area. The relative economies of these procedures are discussed in relation to the size and depth of the soil or rock cavity, possible future cavity formation, magnitude of loading and acceptable safety factors.

  17. Evaluation of Flygt Propeller Xixers for Double Shell Tank (DST) High Level Waste Auxiliary Solids Mobilization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PACQUET, E.A.

    The River Protection Project (RPP) is planning to retrieve radioactive waste from the single-shell tanks (SST) and double-shell tanks (DST) underground at the Hanford Site. This waste will then be transferred to a waste treatment plant to be immobilized (vitrified) in a stable glass form. Over the years, the waste solids in many of the tanks have settled to form a layer of sludge at the bottom. The thickness of the sludge layer varies from tank to tank, from no sludge or a few inches of sludge to about 15 ft of sludge. The purpose of this technology and engineeringmore » case study is to evaluate the Flygt{trademark} submersible propeller mixer as a potential technology for auxiliary mobilization of DST HLW solids. Considering the usage and development to date by other sites in the development of this technology, this study also has the objective of expanding the knowledge base of the Flygt{trademark} mixer concept with the broader perspective of Hanford Site tank waste retrieval. More specifically, the objectives of this study delineated from the work plan are described.« less

  18. A strategy for health promotion at multiple corporate sites.

    PubMed

    Alexy, B; Eynon, D

    1991-02-01

    1. The logistical problems associated with delivery of health promotion programs at multiple corporate sites can be addressed through the use of health education packets. 2. The role of the nurse or health coordinator is critical in assisting and guiding the employee as the health plan is executed. 3. Problematic areas related to implementation of programs at remote sites can be alleviated through careful planning and extensive communication. 4. Advertising, input from employees and staff, and follow up are important in the success of a program.

  19. ARC-2006-ACD06-0213-010

    NASA Image and Video Library

    2006-10-03

    Ames and Moffett Field (MFA) historical sites and memorials Unitary Plan Wind Tunned plaza; display and historical site plaques with the NASA logo on the Wind Tunnel valve as a backdrop. Plaque depicts that Ames Unitary Plan Wind Tunnel has been designated a National Historic Landmark by the National Park Service, United States Department of the Interior 1985 The plaque reads; This site possesses national significance in commemorating the history of the United States of America. That ceremony took place on September 12, 1990

  20. Wyoming's industrial siting permit process and environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Hyman, Eric L.

    1982-01-01

    The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.

  1. United States Air Force 611th Air Support Group/Civil Engineering Squadron, Elmendorf AFB, Alaska. Decision document for no further response action planned Oliktok Point Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-06-03

    This Decision Document discusses the selection of no further action as the recommended action for four sites located at the Oliktok Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the eight sites located at the Oliktok Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, four sites are recommended for no further action.

  2. The Color Wonderland of Mawrth Vallis

    NASA Image and Video Library

    2016-09-08

    There is a candidate landing site in the Mawrth Vallis region for the European Space Agency's ExoMars rover, planned to launch in 2020. This is one of the HiRISE images acquired to evaluate this site. Mawrth Vallis has some of the most spectacular color variations seen anywhere on Mars. This color variability is due to a range of hydrated minerals -- water caused alteration of these ancient deposits -- which is why this site is of interest to study the past habitability of Mars. http://photojournal.jpl.nasa.gov/catalog/PIA21029

  3. Case studies of conservation plans that incorporate geodiversity.

    PubMed

    Anderson, M G; Comer, P J; Beier, P; Lawler, J J; Schloss, C A; Buttrick, S; Albano, C M; Faith, D P

    2015-06-01

    Geodiversity has been used as a surrogate for biodiversity when species locations are unknown, and this utility can be extended to situations where species locations are in flux. Recently, scientists have designed conservation networks that aim to explicitly represent the range of geophysical environments, identifying a network of physical stages that could sustain biodiversity while allowing for change in species composition in response to climate change. Because there is no standard approach to designing such networks, we compiled 8 case studies illustrating a variety of ways scientists have approached the challenge. These studies show how geodiversity has been partitioned and used to develop site portfolios and connectivity designs; how geodiversity-based portfolios compare with those derived from species and communities; and how the selection and combination of variables influences the results. Collectively, they suggest 4 key steps when using geodiversity to augment traditional biodiversity-based conservation planning: create land units from species-relevant variables combined in an ecologically meaningful way; represent land units in a logical spatial configuration and integrate with species locations when possible; apply selection criteria to individual sites to ensure they are appropriate for conservation; and develop connectivity among sites to maintain movements and processes. With these considerations, conservationists can design more effective site portfolios to ensure the lasting conservation of biodiversity under a changing climate. © 2015 Society for Conservation Biology.

  4. Thermal infrared remote sensing in assessing groundwater and surface-water resources related to Hannukainen mining development site, northern Finland

    NASA Astrophysics Data System (ADS)

    Rautio, Anne B.; Korkka-Niemi, Kirsti I.; Salonen, Veli-Pekka

    2018-02-01

    Mining development sites occasionally host complicated aquifer systems with notable connections to natural surface water (SW) bodies. A low-altitude thermal infrared (TIR) imaging survey was conducted to identify hydraulic connections between aquifers and rivers and to map spatial surface temperature patterns along the subarctic rivers in the proximity of the Hannukainen mining development area, northern Finland. In addition to TIR data, stable isotopic compositions ( δ 18O, δD) and dissolved silica concentrations were used as tracers to verify the observed groundwater (GW) discharge into the river system. Based on the TIR survey, notable GW discharge into the main river channel and its tributaries (61 km altogether) was observed and over 500 GW discharge sites were located. On the basis of the survey, the longitudinal temperature patterns of the studied rivers were found to be highly variable. Hydrological and hydrogeological information is crucial in planning and siting essential mining operations, such as tailing areas, in order to prevent any undesirable environmental impacts. The observed notable GW discharge was taken into consideration in the planning of the Hannukainen mining development area. The results of this study support the use of TIR imagery in GW-SW interaction and environmental studies in extensive and remote areas with special concerns for water-related issues but lacking the baseline research.

  5. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  6. Multispecies benefits of wetland conservation for marsh birds, frogs, and species at risk.

    PubMed

    Tozer, Douglas C; Steele, Owen; Gloutney, Mark

    2018-04-15

    Wetlands conserved using water level manipulation, cattle exclusion, naturalization of uplands, and other techniques under the North American Waterfowl Management Plan ("conservation project wetlands") are important for ducks, geese, and swans ("waterfowl"). However, the assumption that conservation actions for waterfowl also benefit other wildlife is rarely quantified. We modeled detection and occupancy of species at sites within 42 conservation project wetlands compared to sites within 52 similar nearby unmanaged wetlands throughout southern Ontario, Canada, and small portions of the adjacent U.S., using citizen science data collected by Bird Studies Canada's Great Lakes Marsh Monitoring Program, including 2 waterfowl and 13 non-waterfowl marsh-breeding bird species (n = 413 sites) and 7 marsh-breeding frog species (n = 191 sites). Occupancy was significantly greater at conservation project sites compared to unmanaged sites in 7 of 15 (47%) bird species and 3 of 7 (43%) frog species, with occupancy being higher by a difference of 0.12-0.38 across species. Notably, occupancy of priority conservation concern or at-risk Black Tern (Chlidonias niger), Common Gallinule (Gallinula galeata), Least Bittern (Ixobrychus exilis), Sora (Porzana carolina), and Western Chorus Frog (Pseudacris triseriata) was significantly higher at conservation project sites compared to unmanaged sites. The results demonstrate the utility of citizen science to inform wetland conservation, and suggest that actions under the North American Waterfowl Management Plan are effective for conserving non-waterfowl species. Copyright © 2018 Elsevier Ltd. All rights reserved.

  7. A multi-institutional study of independent calculation verification in inhomogeneous media using a simple and effective method of heterogeneity correction integrated with the Clarkson method.

    PubMed

    Jinno, Shunta; Tachibana, Hidenobu; Moriya, Shunsuke; Mizuno, Norifumi; Takahashi, Ryo; Kamima, Tatsuya; Ishibashi, Satoru; Sato, Masanori

    2018-05-21

    In inhomogeneous media, there is often a large systematic difference in the dose between the conventional Clarkson algorithm (C-Clarkson) for independent calculation verification and the superposition-based algorithms of treatment planning systems (TPSs). These treatment site-dependent differences increase the complexity of the radiotherapy planning secondary check. We developed a simple and effective method of heterogeneity correction integrated with the Clarkson algorithm (L-Clarkson) to account for the effects of heterogeneity in the lateral dimension, and performed a multi-institutional study to evaluate the effectiveness of the method. In the method, a 2D image reconstructed from computed tomography (CT) images is divided according to lines extending from the reference point to the edge of the multileaf collimator (MLC) or jaw collimator for each pie sector, and the radiological path length (RPL) of each line is calculated on the 2D image to obtain a tissue maximum ratio and phantom scatter factor, allowing the dose to be calculated. A total of 261 plans (1237 beams) for conventional breast and lung treatments and lung stereotactic body radiotherapy were collected from four institutions. Disagreements in dose between the on-site TPSs and a verification program using the C-Clarkson and L-Clarkson algorithms were compared. Systematic differences with the L-Clarkson method were within 1% for all sites, while the C-Clarkson method resulted in systematic differences of 1-5%. The L-Clarkson method showed smaller variations. This heterogeneity correction integrated with the Clarkson algorithm would provide a simple evaluation within the range of -5% to +5% for a radiotherapy plan secondary check.

  8. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less

  9. Is an advance care planning model feasible in community palliative care? A multi-site action research approach.

    PubMed

    Blackford, Jeanine; Street, Annette

    2012-09-01

    This article reports a study to determine the feasibility of an advance care planning model developed with Australian community palliative care services. An effective advance care planning programme involves an organizational wide commitment and preparedness for health service reform to embed advance care planning into routine practice. Internationally, such programmes have been implemented predominantly in aged and acute care with more recent work in primary care. A multi-site action research was conducted over a 16-month period in 2007-2009 with three Victorian community palliative care services. Using mixed method data collection strategies to assess feasibility, we conducted a baseline audit of staff and clients; analysed relevant documents (client records, policies, procedures and quality improvement strategies) pre-implementation and post-implementation and conducted key informant interviews (n = 9). Three community palliative care services: one regional and two metropolitan services in Victoria, Australia. The services demonstrated that it was feasible to embed the Model into their organizational structures. Advance care planning conversations and involvement of family was an important outcome measure rather than completion rate of advance care planning documents in community settings. Services adapted and applied their own concept of community, which widened the impact of the model. Changes to quality audit processes were essential to consolidate the model into routine palliative care practice. An advance care planning model is feasible for community palliative care services. Quality audit processes are an essential component of the Model with documentation of advance care planning discussion established as an important outcome measure. © 2011 Blackwell Publishing Ltd.

  10. 15. Site plan, 1915, bottom half With CT214, photocopied from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Site plan, 1915, bottom half With CT-2-14, photocopied from an ozalid print, 'Map of Plant of Sentinel Manufacturing Co.,' Folio 2, EWC. The Sentinel Manufacturing Co. produced gas stoves. They leased the Whitney Armory buildings about 1915. - Eli Whitney Armory, West of Whitney Avenue, Armory Street Vicinity, Hamden, New Haven County, CT

  11. 40 CFR 63.11468 - What are the monitoring requirements for new and existing sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... baghouse, including but not limited to air leaks, torn or broken bags or filter media, or any other... identified in the site-specific monitoring plan required by paragraph (c)(2) of this section. (vii) You must... submit to the Administrator or delegated authority for approval a site-specific monitoring plan for each...

  12. 78 FR 38733 - Notice of Resource Advisory Council Meetings for the Dominguez-Escalante National Conservation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ... June 26, 2013, which was advertised through a separate notice. Any adjustments to the meetings will be advertised on the Dominguez-Escalante NCA Resource Management Plan (RMP) Web site, http://www.blm.gov/co/st... Register, announced through local media and on the BLM's Web site for the Dominguez-Escalante planning...

  13. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, Matthew T.; Judd, Steven L.

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  14. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...

  15. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...

  16. 15 CFR 713.4 - Advance declaration requirements for additionally planned production, processing, or consumption...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) You plan to increase the production, processing, or consumption of a Schedule 2 chemical by a plant... production, processing, or consumption of a Schedule 2 chemical by a declared plant site by 20 percent or... multipurpose activities; (v) Changes to the plant site's status relating to domestic transfer of the chemical...

  17. 77 FR 132 - General Management Plan and Environmental Impact Statement for Lincoln Home National Historic Site

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ...: The Abbreviated Final General Management Plan and Environmental Impact Statement (GMP/EIS) will remain... Site. SUPPLEMENTARY INFORMATION: We, the National Park Service, prepared a draft GMP/EIS for the park... summaries of the draft GMP/EIS. In addition to the distribution, the draft GMP/EIS was also made available...

  18. 78 FR 72060 - Chimney Rock National Monument Management Plan; San Juan National Forest; Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ..., as well as objects of deep cultural and educational value. The plan will also provide for continued... Ranger District office in Pagosa Springs, Colorado, and on the San Juan National Forest Web site at www..., direct mailings, emails, and will be posted on the San Juan National Forest Web site. It is important...

  19. Telescope Array Results on UHE Cosmic Rays and the Plan

    NASA Astrophysics Data System (ADS)

    Sagawa, Hiroyuki

    The Telescope Array (TA) is the largest experiment in the Northern Hemisphere studying the origin and nature of ultra-high-energy cosmic rays. The TA detector consists of a surface array of 507 scintillation counters covering approximately 700 km2, and 38 fluorescence telescopes located at three sites looking over the surface array. Here, recent TA results using the first five years of data and our ongoing and near-future plans are presented.

  20. AmeriFlux Network Data Activities: updates, progress and plans

    NASA Astrophysics Data System (ADS)

    Yang, B.; Boden, T.; Krassovski, M.; Song, X.

    2013-12-01

    The Carbon Dioxide Information Analysis Center (CDIAC) at the Oak Ridge National Laboratory serves as the long-term data repository for the AmeriFlux network. Datasets currently available include hourly or half-hourly meteorological and flux observations, biological measurement records, and synthesis data products. In this presentation, we provide an update of this network database including a comprehensive review and evaluation of the biological data from about 70 sites, development of a new product for flux uncertainty estimates, and re-formatting of Level-2 standard files. In 2013, we also provided data support to two synthesis studies --- 2012 drought synthesis and FACE synthesis. Issues related to data quality and solutions in compiling datasets for these synthesis studies will be discussed. We will also present our work plans in developing and producing other high-level products, such as derivation of phenology from the available measurements at flux sites.

  1. Livermore Site Spill Prevention, Control, and Countermeasures (SPCC) Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bellah, W.; Griffin, D.; Mertesdorf, E.

    This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 ofmore » the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.« less

  2. Wind energy on the horizon in British Columbia. A review and evaluation of the British Columbia wind energy planning framework

    NASA Astrophysics Data System (ADS)

    Day, Jason

    This study examines the wind energy planning frameworks from ten North American jurisdictions, drawing important lessons that British Columbia could use to build on its current model which has been criticized for its limited scope and restriction of local government powers. This study contributes to similar studies conducted by Kimrey (2006), Longston (2006), and Eriksen (2009). This study concludes that inclusion of wind resource zones delineated through strategic environmental assessment, programme assessment, and conducting research-oriented studies could improve the current British Columbia planning framework. The framework should also strengthen its bat impact assessment practices and incorporate habitat compensation. This research also builds upon Rosenberg's (2008) wind energy planning framework typologies. I conclude that the typology utilized in Texas should be employed in British Columbia in order to facilitate utilizing wind power. The only adaptation needed is the establishment of a cross-jurisdictional review committee for project assessment to address concerns about local involvement and site-specific environmental and social concerns.

  3. Brownfields Green Avenue Sites: Technical Memorandum - Conceptual Design for Sustainable Redevelopment

    EPA Pesticide Factsheets

    This technical memorandum briefly describes the site and proposed conceptual site plan, indicates conceptual design considerations, specifies recommended green and sustainable features, and offers other recommendations

  4. Visible, Durable, Enforceable Institutional Controls: Weldon Spring Site - A 10-Year Journey - 13190

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Uhlmeyer, Terri; Thompson, Randy; Starr, Ken

    2013-07-01

    The DOE Office of Legacy Management's (LM's) mission is to manage the DOE's post-closure responsibilities and ensure the future protection of human health and the environment. LM has control and custody of legacy land, structures, and facilities and is responsible for maintaining them at levels suitable for their long-term use. This includes all engineered and institutional controls (ICs) designed as another level of assurance to prevent exposure to residual contamination and waste. The development and management of ICs has been, and continues to be, a critical component to the success of LM surveillance and maintenance activities. Many major federal laws,more » Executive Orders, regulations, and various other drivers influence the establishment and use of ICs at LM sites. LM uses a wide range of ICs to appropriately limit access to, or uses of, land, facilities, and other real and personal properties; protect the environment; maintain the physical safety and security of DOE facilities; and prevent or limit inadvertent human and environmental exposure to residual contaminants and other hazards. The ICs at the Weldon Spring, Missouri, Site were developed in close coordination with federal and state regulators. An Explanation of Significant Differences (ESD) was issued in February 2005, which clarified the use restrictions necessary for the remedial actions specified in the Records of Decision for the separate operable units to remain protective over the long-term. The operable units included the Chemical Plant Operable Unit, the Chemical Plant Groundwater Operable Unit, and the Quarry Residuals Operable Unit. The ESD clarified specific requirements for each site area that needed use restrictions and established how DOE would implement, maintain, and monitor the specific requirements. DOE developed the Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Weldon Spring, Missouri, Site (LTS and M Plan) that addressed the full scope of the site management activities necessary to ensure that the Weldon Spring Site remains protective over the long-term. The LTS and M Plan is revised periodically to ensure its applicability to changing site, regulatory, or procedural conditions. In addition to addressing such activities as long-term groundwater monitoring and disposal cell maintenance, the LTS and M Plan was developed and issued to ensure that the use restrictions identified in the ESD were properly imposed and maintained. The LTS and M Plan included a detailed IC Implementation Plan, which includes a process for evaluating and identifying specific IC mechanisms that best accomplish the objectives set out in the ESD. Consistent with EPA guidance on selecting ICs, various IC mechanisms were evaluated, including government controls, proprietary controls, enforcement tools, and informational devices. Where appropriate, redundant mechanisms were employed to increase the effectiveness of the ICs. Information in the IC Implementation Plan includes: (1) a discussion of current site conditions (reflecting post-remedial action conditions for the Chemical Plant and Quarry Areas and the risk-basis for why use restrictions are needed); (2) the objectives of, or performance expectations for, the use restrictions; (3) specific ICs already in place and additional mechanisms identified for implementation; (4) a schedule for implementing additional ICs; (5) procedures for maintaining the ICs and for conducting periodic inspections; and (6) general provisions for the implementing ICs for the site. The actual agreements and documentation of the various ICs are included in an appendix of the LTS and M Plan. These documents are also available via the internet from the authorizing agencies (County, Missouri Department of Natural Resources, EPA, etc.) The Weldon Spring Site personnel have been successful in finalizing each of the ICs that were established for the site. The planning, establishment, and implementation of the ICs was a long and detailed process with several lessons-learned that were identified along the way. (authors)« less

  5. SU-E-J-72: Dosimetric Study of Cone-Beam CT-Based Radiation Treatment Planning Using a Patient-Specific Stepwise CT-Density Table

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, S; Le, Q; Mutaf, Y

    2015-06-15

    Purpose: To assess dose calculation accuracy of cone-beam CT (CBCT) based treatment plans using a patient-specific stepwise CT-density conversion table in comparison to conventional CT-based treatment plans. Methods: Unlike CT-based treatment planning which use fixed CT-density table, this study used patient-specific CT-density table to minimize the errors in reconstructed mass densities due to the effects of CBCT Hounsfield unit (HU) uncertainties. The patient-specific CT-density table was a stepwise function which maps HUs to only 6 classes of materials with different mass densities: air (0.00121g/cm3), lung (0.26g/cm3), adipose (0.95g/cm3), tissue (1.05 g/cm3), cartilage/bone (1.6g/cm3), and other (3g/cm3). HU thresholds to definemore » different materials were adjusted for each CBCT via best match with the known tissue types in these images. Dose distributions were compared between CT-based plans and CBCT-based plans (IMRT/VMAT) for four types of treatment sites: head and neck (HN), lung, pancreas, and pelvis. For dosimetric comparison, PTV mean dose in both plans were compared. A gamma analysis was also performed to directly compare dosimetry in the two plans. Results: Compared to CT-based plans, the differences for PTV mean dose were 0.1% for pelvis, 1.1% for pancreas, 1.8% for lung, and −2.5% for HN in CBCT-based plans. The gamma passing rate was 99.8% for pelvis, 99.6% for pancreas, and 99.3% for lung with 3%/3mm criteria, and 80.5% for head and neck with 5%/3mm criteria. Different dosimetry accuracy level was observed: 1% for pelvis, 3% for lung and pancreas, and 5% for head and neck. Conclusion: By converting CBCT data to 6 classes of materials for dose calculation, 3% of dose calculation accuracy can be achieved for anatomical sites studied here, except HN which had a 5% accuracy. CBCT-based treatment planning using a patient-specific stepwise CT-density table can facilitate the evaluation of dosimetry changes resulting from variation in patient anatomy.« less

  6. Empirical estimation of school siting parameter towards improving children's safety

    NASA Astrophysics Data System (ADS)

    Aziz, I. S.; Yusoff, Z. M.; Rasam, A. R. A.; Rahman, A. N. N. A.; Omar, D.

    2014-02-01

    Distance from school to home is a key determination in ensuring the safety of hildren. School siting parameters are made to make sure that a particular school is located in a safe environment. School siting parameters are made by Department of Town and Country Planning Malaysia (DTCP) and latest review was on June 2012. These school siting parameters are crucially important as they can affect the safety, school reputation, and not to mention the perception of the pupil and parents of the school. There have been many studies to review school siting parameters since these change in conjunction with this ever-changing world. In this study, the focus is the impact of school siting parameter on people with low income that live in the urban area, specifically in Johor Bahru, Malaysia. In achieving that, this study will use two methods which are on site and off site. The on site method is to give questionnaires to people and off site is to use Geographic Information System (GIS) and Statistical Product and Service Solutions (SPSS), to analyse the results obtained from the questionnaire. The output is a maps of suitable safe distance from school to house. The results of this study will be useful to people with low income as their children tend to walk to school rather than use transportation.

  7. Renewable Energy Zones for Balancing Siting Trade-offs in India

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deshmukh, Ranjit; Wu, Grace C.; Phadke, Amol

    India’s targets of 175 GW of renewable energy capacity by 2022, and 40% generation capacity from non-fossil fuel sources by 2030 will require a rapid and dramatic increase in solar and wind capacity deployment and overcoming its associated economic, siting, and power system challenges. The objective of this study was to spatially identify the amount and quality of wind and utility-scale solar resource potential in India, and the possible siting-related constraints and opportunities for development of renewable resources. Using the Multi-criteria Analysis for Planning Renewable Energy (MapRE) methodological framework, we estimated several criteria valuable for the selection of sites formore » development for each identified potential "zone", such as the levelized cost of electricity, distance to nearest substation, capacity value (or the temporal matching of renewable energy generation to demand), and the type of land cover. We find that high quality resources are spatially heterogeneous across India, with most wind and solar resources concentrated in the southern and western states, and the northern state of Rajasthan. Assuming India's Central Electricity Regulatory Commission's norms, we find that the range of levelized costs of generation of wind and solar PV resources overlap, but concentrated solar power (CSP) resources can be approximately twice as expensive. Further, the levelized costs of generation vary much more across wind zones than those across solar zones because of greater heterogeneity in the quality of wind resources compared to that of solar resources. When considering transmission accessibility, we find that about half of all wind zones (47%) and two-thirds of all solar PV zones (66%) are more than 25 km from existing 220 kV and above substations, suggesting potential constraints in access to high voltage transmission infrastructure and opportunities for preemptive transmission planning to scale up RE development. Additionally and importantly, we find that about 84% of all wind zones are on agricultural land, which provide opportunities for multiple-uses of land but may also impose constraints on land availability. We find that only 29% of suitable solar PV sites and 15% of CSP sites are within 10 km of a surface water body suggesting water availability as a significant siting constraint for solar plants. Availability of groundwater resources was not analyzed as part of this study. Lastly, given the possible economic benefits of transmission extensions or upgrades that serve both wind and solar generators, we quantified the co-location opportunities between the two technologies and find that about a quarter (28%) of all solar PV zones overlap with wind zones. Using the planning tools made available as part of this study, these multiple siting constraints and opportunities can be systematically compared and weighted to prioritize development that achieves a particular technology target. Our results are limited by the uncertainties associated with the input datasets, in particular the geospatial wind and solar resource, transmission, and land use land cover datasets. As input datasets get updated and improved, the methodology and tools developed through this study can be easily adapted and applied to these new datasets to improve upon the results presented in this study. India is on a path to significantly decarbonize its electricity grid through wind and solar development. A stakeholder-driven, systematic, and integrated planning approach using data and tools such as those highlighted in this study is essential to not only meet the country's RE targets, but to meet them in a cost-effective, and socially and environmentally sustainable way.« less

  8. SU-E-T-49: A Multi-Institutional Study of Independent Dose Verification for IMRT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baba, H; Tachibana, H; Kamima, T

    2015-06-15

    Purpose: AAPM TG114 does not cover the independent verification for IMRT. We conducted a study of independent dose verification for IMRT in seven institutes to show the feasibility. Methods: 384 IMRT plans in the sites of prostate and head and neck (HN) were collected from the institutes, where the planning was performed using Eclipse and Pinnacle3 with the two techniques of step and shoot (S&S) and sliding window (SW). All of the institutes used a same independent dose verification software program (Simple MU Analysis: SMU, Triangle Product, Ishikawa, JP), which is Clarkson-based and CT images were used to compute radiologicalmore » path length. An ion-chamber measurement in a water-equivalent slab phantom was performed to compare the doses computed using the TPS and an independent dose verification program. Additionally, the agreement in dose computed in patient CT images between using the TPS and using the SMU was assessed. The dose of the composite beams in the plan was evaluated. Results: The agreement between the measurement and the SMU were −2.3±1.9 % and −5.6±3.6 % for prostate and HN sites, respectively. The agreement between the TPSs and the SMU were −2.1±1.9 % and −3.0±3.7 for prostate and HN sites, respectively. There was a negative systematic difference with similar standard deviation and the difference was larger in the HN site. The S&S technique showed a statistically significant difference between the SW. Because the Clarkson-based method in the independent program underestimated (cannot consider) the dose under the MLC. Conclusion: The accuracy would be improved when the Clarkson-based algorithm should be modified for IMRT and the tolerance level would be within 5%.« less

  9. Comparing Methods for Prioritising Protected Areas for Investment: A Case Study Using Madagascar’s Dry Forest Reptiles

    PubMed Central

    Gardner, Charlie J.; Raxworthy, Christopher J.; Metcalfe, Kristian; Raselimanana, Achille P.; Smith, Robert J.; Davies, Zoe G.

    2015-01-01

    There are insufficient resources available to manage the world’s existing protected area portfolio effectively, so the most important sites should be prioritised in investment decision-making. Sophisticated conservation planning and assessment tools developed to identify locations for new protected areas can provide an evidence base for such prioritisations, yet decision-makers in many countries lack the institutional support and necessary capacity to use the associated software. As such, simple heuristic approaches such as species richness or number of threatened species are generally adopted to inform prioritisation decisions. However, their performance has never been tested. Using the reptile fauna of Madagascar’s dry forests as a case study, we evaluate the performance of four site prioritisation protocols used to rank the conservation value of 22 established and candidate protected areas. We compare the results to a benchmark produced by the widely-used systematic conservation planning software Zonation. The four indices scored sites on the basis of: i) species richness; ii) an index based on species’ Red List status; iii) irreplaceability (a key metric in systematic conservation planning); and, iv) a novel Conservation Value Index (CVI), which incorporates species-level information on endemism, representation in the protected area system, tolerance of habitat degradation and hunting/collection pressure. Rankings produced by the four protocols were positively correlated to the results of Zonation, particularly amongst high-scoring sites, but CVI and Irreplaceability performed better than Species Richness and the Red List Index. Given the technological capacity constraints experienced by decision-makers in the developing world, our findings suggest that heuristic metrics can represent a useful alternative to more sophisticated analyses, especially when they integrate species-specific information related to extinction risk. However, this can require access to, and understanding of, more complex species data. PMID:26162073

  10. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  11. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  12. 75 FR 63851 - Draft General Management Plan and Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Draft General Management Plan and Environmental... the Interior. ACTION: Notice of Availability of the Draft General Management Plan and Environmental... 63852

  13. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olch, A

    2015-06-15

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Elevenmore » neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has provded a license for the software described.« less

  14. 40 CFR 146.93 - Post-injection site care and site closure.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Post-injection site care and site... Applicable to Class VI Wells § 146.93 Post-injection site care and site closure. (a) The owner or operator of a Class VI well must prepare, maintain, and comply with a plan for post-injection site care and site...

  15. The Great War: Online Resources.

    ERIC Educational Resources Information Center

    Duncanson, Bruce

    2002-01-01

    Presents an annotated bibliography of Web sites about World War I. Includes: (1) general Web sites; (2) Web sites with information during the war; (3) Web sites with information about post-World War I; (4) Web sites that provide photos, sound files of speeches, and propaganda posters; and (5) Web sites with lesson plans. (CMK)

  16. Utilizing patient geographic information system data to plan telemedicine service locations.

    PubMed

    Soares, Neelkamal; Dewalle, Joseph; Marsh, Ben

    2017-09-01

    To understand potential utilization of clinical services at a rural integrated health care system by generating optimal groups of telemedicine locations from electronic health record (EHR) data using geographic information systems (GISs). This retrospective study extracted nonidentifiable grouped data of patients over a 2-year period from the EHR, including geomasked locations. Spatially optimal groupings were created using available telemedicine sites by calculating patients' average travel distance (ATD) to the closest clinic site. A total of 4027 visits by 2049 unique patients were analyzed. The best travel distances for site groupings of 3, 4, 5, or 6 site locations were ranked based on increasing ATD. Each one-site increase in the number of available telemedicine sites decreased minimum ATD by about 8%. For a given group size, the best groupings were very similar in minimum travel distance. There were significant differences in predicted patient load imbalance between otherwise similar groupings. A majority of the best site groupings used the same small number of sites, and urban sites were heavily used. With EHR geospatial data at an individual patient level, we can model potential telemedicine sites for specialty access in a rural geographic area. Relatively few sites could serve most of the population. Direct access to patient GIS data from an EHR provides direct knowledge of the client base compared to methods that allocate aggregated data. Geospatial data and methods can assist health care location planning, generating data about load, load balance, and spatial accessibility. © The Author 2017. Published by Oxford University Press on behalf of the American Medical Informatics Association. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  17. Remediation plans in family medicine residency

    PubMed Central

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  18. HCH contamination from former pesticide production in Brazil--a challenge for the Stockholm Convention implementation.

    PubMed

    Torres, J P M; Fróes-Asmus, C I R; Weber, R; Vijgen, J M H

    2013-04-01

    Hexachlorocyclohexane (HCH) isomers (α-, β- and γ- HCH [lindane]) were recently added to the list of persistent organic pollutants regulated by the Stockholm Convention, and therefore, the legacy of HCH and lindane production has become an issue of global relevance. The production of lindane with the much larger quantities of associated waste isomers has generated large waste deposits and contaminated sites. This article presents an overview of HCH-polluted sites in Brazil as a basis for further activities related to the Stockholm Convention. The locations of HCH stockpiles and contaminated sites in Brazil arising from production and formulation have been compiled and mapped. This shows that the measures taken over the past 25 years have not resulted in remediation of the HCH pollution. An exposure risk study has been summarised for one major site and is included to demonstrate the contemporary relevance of the contamination. Major site remediation efforts are planned at one site but people live close to several other sites, and there is an urgent need of further assessments and remediation to ensure the protection of human health and the environment. The Stockholm Convention requires a systematic approach and should be adopted for the assessment of all sites and appropriate isolation/remediation measures should be facilitated. The appropriate planning of these activities for the production site in Rio de Janeiro could be a positive contribution for Rio+20 highlighting that green economy and sustainable production also include the appropriate management of legacies of historic production of an industrial sector (here the organochlorine industry).

  19. Golden Eagle Monitoring Plan for the Desert Renewable Energy Conservation Plan

    USGS Publications Warehouse

    Wiens, David; Kolar, Patrick; Katzner, Todd

    2018-01-01

    This report describes options for monitoring the status and population trends of the golden eagle (Aquila chrysaetos) within the Desert Renewable Energy Conservation Plan (DRECP) area of Southern California in maintaining stable or increasing population in the planning area. The report profiles the ecology of golden eagles in the region and provides a range of potential sampling options to address monitoring needs and objectives. This approach also focused on links between changes in human land-use, golden eagle nesting and foraging habitat conditions, and population dynamics. The report outlines how monitoring data from demographic, prey, and habitat studies were used to develop a predictive demographic model for golden eagles in the DRECP area. Results from the model simulations suggest increases in renewable energy development could have negative consequences for population trajectories. Results also suggest site-specific conservation actions could reduce the magnitude of negative impacts to the local population of eagles. A monitoring framework is proposed including: (1) annual assessments of site-occupancy and reproduction by territorial pairs of golden eagles (including rates at which sites become colonized or vacated over time); (2) estimates of survival, movements, and intensity of use of landscapes by breeding and non-breeding golden eagles; (3) periodic (conducted every two to four years) assessments of nesting and foraging habitats, prey populations, and associations with land-use and management activities; and (4) updating the predictive demographic model with new information obtained on eagles and associated population stressors. The results of this research were published in the Journal of Rapture Research, Wiens, David,Inman, Rich D., Esque, Todd C., Longshore, Kathleen M. and Nussear, Kenneth (2017). Spatial Demographic Models to Inform Conservation Planning of Golden Eagles in Renewable Energy Landscapes. 51(3):234-257.

  20. Guidelines for treatment naming in radiation oncology

    PubMed Central

    Shields, Lisa B. E.; Hahl, Michael; Maudlin, Casey; Bassett, Mark; Spalding, Aaron C.

    2015-01-01

    Safety concerns may arise from a lack of standardization and ambiguity during the treatment planning and delivery process in radiation therapy. A standardized target and organ‐at‐risk naming convention in radiation therapy was developed by a task force comprised of several Radiation Oncology Societies. We present a nested‐survey approach in a community setting to determine the methodology for radiation oncology departments to standardize their practice. Our Institution's continuous quality improvement (CQI) committee recognized that, due to growth from one to three centers, significant variability existed within plan parameters specific to patients’ treatment. A multidiscipline, multiclinical site consortium was established to create a guideline for standard naming. Input was gathered using anonymous, electronic surveys from physicians, physicists, dosimetrists, chief therapists, and nurse managers. Surveys consisted of several primary areas of interest: anatomical sites, course naming, treatment plan naming, and treatment field naming. Additional concepts included capitalization, specification of laterality, course naming in the event of multiple sites being treated within the same course of treatment, primary versus boost planning, the use of bolus, revisions for plans, image‐guidance field naming, forbidden characters, and standard units for commonly used physical quantities in radiation oncology practice. Guidelines for standard treatment naming were developed that could be readily adopted. This multidisciplinary study provides a clear, straightforward, and easily implemented protocol for the radiotherapy treatment process. Standard nomenclature facilitates the safe means of communication between team members in radiation oncology. The guidelines presented in this work serve as a model for radiation oncology clinics to standardize their practices. PACS number(s): 87.56.bd, 87.56.Fc, 87.55.Qr, 87.55.‐x, 87.55.N‐, 87.55.T‐, 87.55.D‐ PMID:27074449

  1. Searching for signposts: Adaptive planning thresholds in long-term water supply projections for the Western U.S.

    NASA Astrophysics Data System (ADS)

    Robinson, B.; Herman, J. D.

    2017-12-01

    Long-term water supply planning is challenged by highly uncertain streamflow projections across climate models and emissions scenarios. Recent studies have devised infrastructure and policy responses that can withstand or adapt to an ensemble of scenarios, particularly those outside the envelope of historical variability. An important aspect of this process is whether the proposed thresholds for adaptation (i.e., observations that trigger a response) truly represent a trend toward future change. Here we propose an approach to connect observations of annual mean streamflow with long-term projections by filtering GCM-based streamflow ensembles. Visualizations are developed to investigate whether observed changes in mean annual streamflow can be linked to projected changes in end-of-century mean and variance relative to the full ensemble. A key focus is identifying thresholds that point to significant long-term changes in the distribution of streamflow (+/- 20% or greater) as early as possible. The analysis is performed on 87 sites in the Western United States, using streamflow ensembles through 2100 from a recent study by the U.S. Bureau of Reclamation. Results focus on three primary questions: (1) how many years of observed data are needed to identify the most extreme scenarios, and by what year can they be identified? (2) are these features different between sites? and (3) using this analysis, do observed flows to date at each site point to significant long-term changes? This study addresses the challenge of severe uncertainty in long-term streamflow projections by identifying key thresholds that can be observed to support water supply planning.

  2. Toward a Conceptual Framework for Blending Social and Biophysical Attributes in Conservation Planning: A Case-Study of Privately-Conserved Lands

    NASA Astrophysics Data System (ADS)

    Pasquini, Lorena; Twyman, Chasca; Wainwright, John

    2010-11-01

    There has been increasing recognition within systematic conservation planning of the need to include social data alongside biophysical assessments. However, in the approaches to identify potential conservation sites, there remains much room for improvement in the treatment of social data. In particular, few rigorous methods to account for the diversity of less-easily quantifiable social attributes that influence the implementation success of conservation sites (such as willingness to conserve) have been developed. We use a case-study analysis of private conservation areas within the Little Karoo, South Africa, as a practical example of the importance of incorporating social data into the process of selecting potential conservation sites to improve their implementation likelihood. We draw on extensive data on the social attributes of our case study obtained from a combination of survey questionnaires and semi-structured interviews. We discuss the need to determine the social attributes that are important for achieving the chosen implementation strategy by offering four tested examples of important social attributes in the Little Karoo: the willingness of landowners to take part in a stewardship arrangement, their willingness to conserve, their capacity to conserve, and the social capital among private conservation area owners. We then discuss the process of using an implementation likelihood ratio (derived from a combined measure of the social attributes) to assist the choice of potential conservation sites. We conclude by summarizing our discussion into a simple conceptual framework for identifying biophysically-valuable sites which possess a high likelihood that the desired implementation strategy will be realized on them.

  3. Corrective action investigation plan for Corrective Action Unit 340, Pesticide Release Sites, Nevada Test Site, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Correction Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense. As required by the FFACO (1996), this document provides or references all of the specific information for planning investigation activities associated with three Corrective Action Sites (CASs) located at the Nevada Test Site (NTS). These CASs are collectively known as Corrective Action Unit (CAU) 340, Pesticide Release Sites. According to themore » FFACO, CASs are sites that may require corrective action(s) and may include solid waste management units or individual disposal or release sites. These sites are CAS 23-21-01, Area 23 Quonset Hut 800 (Q800) Pesticide Release Ditch; CAS 23-18-03, Area 23 Skid Huts Pesticide Storage; and CAS 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage (Q15-11). The purpose of this CAIP for CAU 340 is to direct and guide the investigation for the evaluation of the nature and extent of pesticides, herbicides, and other contaminants of potential concern (COPCs) that were stored, mixed, and/or disposed of at each of the CASs.« less

  4. [On-site quality control of acupuncture randomized controlled trial: design of content and checklist of quality control based on PICOST].

    PubMed

    Li, Hong-Jiao; He, Li-Yun; Liu, Zhi-Shun; Sun, Ya-Nan; Yan, Shi-Yan; Liu, Jia; Zhao, Ye; Liu, Bao-Yan

    2014-02-01

    To effectively guarantee quality of randomized controlld trial (RCT) of acupuncture and develop reasonable content and checklist of on-site quality control, influencing factors on quality of acupuncture RCT are analyzed and scientificity of quality control content and feasibility of on-site manipulation are put into overall consideration. Based on content and checklist of on-site quality control in National 11th Five-Year Plan Project Optimization of Comprehensive Treatment Plan for TCM in Prevention and Treatment of Serious Disease and Clinical Assessment on Generic Technology and Quality Control Research, it is proposed that on-site quality control of acupuncture RCT should be conducted with PICOST (patient, intervention, comparison, out come, site and time) as core, especially on quality control of interveners' skills and outcome assessment of blinding, and checklist of on-site quality control is developed to provide references for undertaking groups of the project.

  5. 14 CFR 415.119 - Launch plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch plans. 415.119 Section 415.119... From a Non-Federal Launch Site § 415.119 Launch plans. An applicant's safety review document must contain the plans required by § 417.111 of this chapter, except for the countdown plan of § 417.111(l) of...

  6. High-Resolution Topomapping of Mars: Life After MER Site Selection

    NASA Technical Reports Server (NTRS)

    Kirk, R. L.; Howington-Kraus, E.; Hare, T. M.; Soricone, R.; Ross, K.; Weller, L.; Rosiek, M.; Redding, B.; Galuszka, D.; Haldemann, A. F. C.

    2004-01-01

    In this abstract we describe our ongoing use of high-resolution images from the Mars Global Surveyor Mars Orbiter Camera Narrow-Angle subsystem (MGS MOC-NA) to derive quantitative topographic and slope data for the martian surface at 3 - 10-m resolution. Our efforts over the past several years focused on assessment of candidate landing sites for the Mars Exploration Rovers (MER) and culminated in the selection of sites in Gusev crater and Meridiani Planum as safe as well as scientifically compelling. As of this writing, MER-A (Spirit) has landed safely in Gusev and we are performing a limited amount of additional mapping near the landing point to support localization of the lander and rover operations planning. The primary focus of our work, however, has been extending our techniques to sample a variety of geologic terrains planetwide to support both a variety of geoscientific studies and planning and data analysis for missions such as Mars Express, Mars Reconnaissance Orbiter, and Phoenix.

  7. Kauai Test Facility hazards assessment document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swihart, A

    1995-05-01

    The Department of Energy Order 55003A requires facility-specific hazards assessment be prepared, maintained, and used for emergency planning purposes. This hazards assessment document describes the chemical and radiological hazards associated with the Kauai Test Facility, Barking Sands, Kauai, Hawaii. The Kauai Test Facility`s chemical and radiological inventories were screened according to potential airborne impact to onsite and offsite individuals. The air dispersion model, ALOHA, estimated pollutant concentrations downwind from the source of a release, taking into consideration the toxicological and physical characteristics of the release site, the atmospheric conditions, and the circumstances of the release. The greatest distance to themore » Early Severe Health Effects threshold is 4.2 kilometers. The highest emergency classification is a General Emergency at the {open_quotes}Main Complex{close_quotes} and a Site Area Emergency at the Kokole Point Launch Site. The Emergency Planning Zone for the {open_quotes}Main Complex{close_quotes} is 5 kilometers. The Emergency Planning Zone for the Kokole Point Launch Site is the Pacific Missile Range Facility`s site boundary.« less

  8. Site remediation considerations and foundation excavation plan for the Walter Reed Army Institute of Research building, Forest Glen, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hambley, D.F.; Harrison, W.; Foster, S.A.

    1991-04-01

    The US Army Corps of Engineers North Atlantic Division, Baltimore District (CENAB), intends to design and construct a medical and dental research facility for the Walter Reed Army Institute of Research (WRAIR) at the Walter Reed Army Medical Center (WRAMC) at Forest Glen, Maryland. Because almost 100% of the proposed building site is located on an uncontrolled landfill that was thought to possibly contain medical, toxic, radioactive, or hazardous waste, it was assumed that remediation of the site might be necessary prior to or in conjunction with excavation. To assess (1) the need for remediation and (2) the potential hazardsmore » to construction workers and the general population, the Baltimore District contracted with Argonne National Laboratory to undertake a site characterization and risk assessment and to develop a foundation-excavation plan. The results of the site characterization and a qualitative risk assessment have been presented in a previous report. This report presents the foundation-excavation plan. 38 refs., 16 figs., 11 tabs.« less

  9. 77 FR 30512 - Notice of Proposed Information Collection Requests; Office of Planning, Evaluation and Policy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ..., including through the use of information technology. Please note that written comments received in response.... This study aims to fill a gap by conducting qualitative case studies of up to 15 sites. This study will systematically analyze qualitative data across multiple respondents to generate portraits of programs and...

  10. 77 FR 50038 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... picograms/liter (water column dissolved concentration). The TCDD Study, together with the model, indicated... 1983 (48 FR 40658). Remedial Investigation and Feasibility Study (RI/FS) EPA filed a lawsuit in 1979 in... (monitoring wells for early detection of Site chemicals); Intermediate and Deep Formations Study (monitoring...

  11. Superfund Site Information

    EPA Pesticide Factsheets

    This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, which was amended by the Superfund Amendments and Reauthorization Act (SARA) in 1986. The Superfund Enterprise Management System (SEMS) contains basic site description, location, schedule of activities, enforcement and settlement data, contaminants and selected remedy and much more, as well as the records that clearly document site decisions. This asset also includes sampling data and lab results (CLPSS, EDDs), redevelopment and technical assistance case studies, site reuse and land revitalization information, EPAOSC.net information, Superfund Technical Assistance Grants information, site management information records (RODs, Remediation plans, cleanup directives), contract management information, and more.Superfund site management information can also be found in agency wide systems such as EAS and COMPASS.

  12. Subseabed Disposal Project annual report, FY85 to termination of project: Physical Oceanography and Water Column Geochemistry Studies, October 1984 through May 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupferman, S.L.

    This report covers the work of the Physical Oceanography and Water Column Geochemistry (POWCG) Studies Group of the Subseabed Disposal Project (SDP) from October 1984 to termination of the project in May 1986. The overview of the work includes an introduction, general descriptions of the activities, and a summary. Detailed discussions are included as appendices. During the period of this report the POWCG Studies Group held a meeting to develop a long-term research plan for the Nares Abyssal Plain, which was recently designated as a study area for the Environmental Study Group of the SDP. The POWCG Studies Group hasmore » also planned and participated in two interdisciplinary oceanographic missions to the Nares which have resulted in the acquisition of data and samples which can be used to begin to understand the workings of the ecosystem at the site, and for developing a preliminary site assessment. The papers in the appendices have been processed for inclusion in the Energy Data Base.« less

  13. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  14. 75 FR 52357 - Request for Comment: National Center for Complementary and Alternative Medicine Draft Strategic Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ... through the NCCAM Web site at http://nccam.nih.gov from on or about August 30 through September 30, 2010... professionals, have been guided by NCCAM's previous strategic plans, located on the NCCAM Web site at http... provide comments from August 30 through September 30, 2010. The papers may be viewed at http://nccam.nih...

  15. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 489: WWII UXO Sites, Tonopah Test Range, Nevada; May 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-05-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.

  16. 40 CFR 60.1130 - How do I make my siting analysis available to the public?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... separation plan. Include the normal business hours of each library. (5) An agenda of the topics that will be...) Distribute your siting analysis and revised materials separation plan to the main public libraries in the... public meeting. (2) The time of the public meeting. (3) The location of the public meeting. (4) The...

  17. Environmental Justice analysis in Hydraulic Fracturing Analysis, June 13, 2011

    EPA Pesticide Factsheets

    This planning document describes the quality assurance/quality control activities and technical requirements that will be used during the research study, using an index-based approach to compare a nationally representative set of well sites fractured.

  18. UTILITY DATA ARCHIVING FOR RISK MANAGEMENT

    EPA Science Inventory

    EPA let a contract for a consultant to collect information about historical changes in operations and maintenance, design and construction, and planning and siting for water and wastewater infrastructure. The goal of this research study is to determine risk management alternativ...

  19. Data Validation Package, June 2016 Groundwater Sampling at the Hallam, Nebraska, Decommissioned Reactor Site, August 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surovchak, Scott; Miller, Michele

    The 2008 Long-Term Surveillance Plan [LTSP] for the Decommissioned Hallam Nuclear Power Facility, Hallam, Nebraska (http://www.lm.doe.gov/Hallam/Documents.aspx) requires groundwater monitoring once every 2 years. Seventeen monitoring wells at the Hallam site were sampled during this event as specified in the plan. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Water levels were measured at all sampled wells and at two additional wells (6A and 6B) prior to the start of sampling. Additionally, water levels of each sampled well were measured at the beginning of sampling. See Attachment 2, Trip Report, for additional details. Sampling and analysismore » were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Gross alpha and gross beta are the only parameters that were detected at statistically significant concentrations. Time/concentration graphs of the gross alpha and gross beta data are included in Attachment 3, Data Presentation. The gross alpha and gross beta activity concentrations observed are consistent with values previously observed and are attributed to naturally occurring radionuclides (e.g., uranium and uranium decay chain products) in the groundwater.« less

  20. 26 CFR 1.401(a)-21 - Rules relating to the use of an electronic medium to provide applicable notices and to make...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... recipient has the effective ability to access. (3) Free paper copy of applicable notice. At the time the... request benefit distributions from the plan on Plan A's Internet Web site. Under Plan A's system for such... qualified plan, permits participants to request benefit distributions from the plan on Plan B's Internet Web...

Top