Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
This volume is one in a series of manuals prepared for EPA to assist its Remedial Project Managers in the assessment of the air contaminant pathway and developing input data for risk assessment. The manual provides guidance on developing baseline-emission estimates from hazardous waste sites. Baseline-emission estimates (BEEs) are defined as emission rates estimated for a site in its undisturbed state. Specifically, the manual is intended to: Present a protocol for selecting the appropriate level of effort to characterize baseline air emissions; Assist site managers in designing an approach for BEEs; Describe useful technologies for developing site-specific baseline emission estimatesmore » (BEEs); Help site managers select the appropriate technologies for generating site-specific BEEs.« less
Photovoltaic utility/customer interface study
NASA Astrophysics Data System (ADS)
Eichler, C. H.; Hayes, T. P.; Matthews, M. M.; Wilraker, V. F.
1980-12-01
The technical, economic, and legal and regulatory issues of interconnecting small, privately-owned, on-site photovoltaic generating systems to an electric utility are addressed. Baseline residential, commercial and industrial class photovoltaic systems were developed. Technical issues of concern affecting this interconnection were identified and included fault protection, undervoltage protection, lamp flicker, revenue metering, loss of synchromism, electrical safety, prevention of backfeeding a de-energized utility feeder, effects of on-site generation on utility relaying schemes, effects of power conditioner harmonic distortion on the electric utility, system isolation, electromagnetic interference and site power factor as seen by the utility. Typical interconnection wiring diagrams were developed for interconnecting each class of baseline photovoltaic generating system.
DOT National Transportation Integrated Search
2010-02-01
This technical report documents the calibration and validation of the baseline (2008) mesoscopic model for the I-394 Minneapolis, Minnesota, Pioneer Site. DynusT was selected as the mesoscopic model for analyzing operating conditions in the I-394 cor...
PNNL Supports Hanford Waste Treatment
None
2018-04-16
For more than 40 years, technical assistance from PNNL has supported the operations and processing of Hanford tank waste. Our expertise in tank waste chemistry, fluid dynamics and scaling, waste forms, and safety bases has helped to shape the siteâs waste treatment baseline and solve operational challenges. The historical knowledge and unique scientific and technical expertise at PNNL are essential to the success of the Hanford mission.
The International Linear Collider Technical Design Report - Volume 3.II: Accelerator Baseline Design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adolphsen, Chris
2013-06-26
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carriedmore » out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.« less
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less
Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)
NASA Technical Reports Server (NTRS)
Kurrus, R.; Stump, F.
1995-01-01
The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.
Space reflector technology and its system implications
NASA Technical Reports Server (NTRS)
Billman, K. W.; Gilbreath, W. P.; Bowen, S. W.
1979-01-01
The technical feasibility of providing nearly continuous solar energy to a world-distributed set of conversion sites by means of a system of orbiting, large-area, low-areal-density reflecting structures is examined. Requisite mirror area to provide a chosen, year-averaged site intensity is shown. A modeled reflector structure, with suitable planarity and ability to meet operational torques and loads, is discussed. Typical spatial and temporal insolation profiles are presented. These determine the sizing of components and the output electric power from a baselined photovoltaic conversion system. Technical and economic challenges which, if met, would allow the system to provide a large fraction of future world energy needs at costs competitive to circa-1995 fossil and nuclear sources are discussed.
EML Regional Baseline Station at Chester, NJ, 1987--1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
The Environmental Measurements Laboratory (EML) has maintained a field station at Chester, NJ, since 1976. Located 64 kilometers west of EML, the site is on the property of Bell Communications Research and is a little more than 900 square meters in area. The Chester site is a rural facility which provides us with an opportunity to carry out regional baseline'' research and to test field instruments. In order to meet our special need the technical criteria for such a field station area the following. The site should represent a regional'' pollution condition; that is, no significant local pollution sources shouldmore » be present. The terrain should be relatively flat with minimal rock outcroppings. The soil cover should not have been disturbed for at least 30 years. This report updates the various programs underway at Chester and presents data that have become available since the last report.« less
EML Regional Baseline Station at Chester, NJ, 1987--1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
The Environmental Measurements Laboratory (EML) has maintained a field station at Chester, NJ, since 1976. Located 64 kilometers west of EML, the site is on the property of Bell Communications Research and is a little more than 900 square meters in area. The Chester site is a rural facility which provides us with an opportunity to carry out ``regional baseline`` research and to test field instruments. In order to meet our special need the technical criteria for such a field station area the following. The site should represent a ``regional`` pollution condition; that is, no significant local pollution sources shouldmore » be present. The terrain should be relatively flat with minimal rock outcroppings. The soil cover should not have been disturbed for at least 30 years. This report updates the various programs underway at Chester and presents data that have become available since the last report.« less
Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
SCHULTZ, E.A.
The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.
TWRS technical baseline database manager definition document
DOE Office of Scientific and Technical Information (OSTI.GOV)
Acree, C.D.
1997-08-13
This document serves as a guide for using the TWRS Technical Baseline Database Management Systems Engineering (SE) support tool in performing SE activities for the Tank Waste Remediation System (TWRS). This document will provide a consistent interpretation of the relationships between the TWRS Technical Baseline Database Management software and the present TWRS SE practices. The Database Manager currently utilized is the RDD-1000 System manufactured by the Ascent Logic Corporation. In other documents, the term RDD-1000 may be used interchangeably with TWRS Technical Baseline Database Manager.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schultz-Fellenz, Emily S.
A portion of LANL’s FY15 SPE objectives includes initial ground-based or ground-proximal investigations at the SPE Phase 2 site. The area of interest is the U2ez location in Yucca Flat. This collection serves as a baseline for discrimination of surface features and acquisition of topographic signatures prior to any development or pre-shot activities associated with SPE Phase 2. Our team originally intended to perform our field investigations using previously vetted ground-based (GB) LIDAR methodologies. However, the extended proposed time frame of the GB LIDAR data collection, and associated data processing time and delivery date, were unacceptable. After technical consultation andmore » careful literature research, LANL identified an alternative methodology to achieve our technical objectives and fully support critical model parameterization. Very-low-altitude unmanned aerial systems (UAS) photogrammetry appeared to satisfy our objectives in lieu of GB LIDAR. The SPE Phase 2 baseline collection was used as a test of this UAS photogrammetric methodology.« less
NASA Astrophysics Data System (ADS)
Nguyen, Tien M.; Guillen, Andy T.; Hant, James J.; Kizer, Justin R.; Min, Inki A.; Siedlak, Dennis J. L.; Yoh, James
2017-05-01
The U.S. Air Force (USAF) has recognized the needs for owning the program and technical knowledge within the Air Force concerning the systems being acquired to ensure success. This paper extends the previous work done by the authors [1-2] on the "Resilient Program Technical Baseline Framework for Future Space Systems" and "Portfolio Decision Support Tool (PDST)" to the development and implementation of the Program and Technical Baseline (PTB) Tracking Tool (PTBTL) for the DOD acquisition life cycle. The paper describes the "simplified" PTB tracking model with a focus on the preaward phases and discusses how to implement this model in PDST.
Service use and financial performance in a replication program on adult day centers.
Reifler, B V; Cox, N J; Jones, B N; Rushing, J; Yates, K
1999-01-01
The authors describe results from Partners in Caregiving: The Dementia Services Program, and present information on service utilization and financial performance among a group of 48 adult day centers across the United States from 1992 to 1996. Centers, with nonrandom assignment, received either grant support (average value: $93,000) or intensive technical assistance (average value: $39,000). Sites reported baseline data and submitted utilization information (enrollment and census) and financial data (revenue and expenses) quarterly. Overall, there were significant increases in enrollment, census, and financial performance (percent of cash expenses met through operating revenue) over the 4-year period. The grant-supported and technical-assistance sites had similar rates of improvement. Results provide data on service utilization and financial performance and demonstrate gains that can be achieved in these areas through improved marketing and financial management.
SERDP Ecosystem Management Project (SEMP): 2004 Technical Report
2006-06-01
sustainability and native biological diversity of terrestrial and aquatic, including marine , ecosystems while supporting hu- man needs, including the DoD mission...of DOD lands, 2. contribute baseline level biotic and abiotic data to the integrated monitoring plan of the host site, 3. establish a long-term...been several lessons learned concerning hardware selection, installation, and implemen- tation as well as equipment performance. All of the abiotic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adolphsen, Chris
2013-06-26
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carriedmore » out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.« less
Landlord project multi-year program plan, fiscal year 1999, WBS 1.5
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dallas, M.D.
The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The mission of Landlord Project is to provide more maintenance replacement of general infrastructure facilities and systems to facilitate the Hanford Site cleanup mission. Also, once an infrastructure facility or system is no longer needed the Landlord Project transitions the facility to final closure/removal through excess, salvage or demolition. Landlord Project activities will be performed in an environmentally sound, safe, economical, prudent, and reliable manner. The Landlord Project consists of the following facilities systems: steam, water, liquid sanitary waste,more » electrical distribution, telecommunication, sanitary landfill, emergency services, general purpose offices, general purpose shops, general purpose warehouses, environmental supports facilities, roads, railroad, and the site land. The objectives for general infrastructure support are reflected in two specific areas, (1) Core Infrastructure Maintenance, and (2) Infrastructure Risk Mitigation.« less
The International Linear Collider Technical Design Report - Volume 2: Physics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baer, Howard; Barklow, Tim; Fujii, Keisuke
2013-06-26
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carriedmore » out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.« less
The International Linear Collider Technical Design Report - Volume 4: Detectors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Behnke, Ties
2013-06-26
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carriedmore » out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.« less
Monitored Geologic Repository Project Description Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
P. M. Curry
2001-01-30
The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing formore » the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6).« less
The International Linear Collider Technical Design Report - Volume 1: Executive Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Behnke, Ties; Brau, James E.; Foster, Brian
2013-06-26
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carriedmore » out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.« less
Defense Information Systems Agency (DISA) GIG Convergence Master Plan 2012 (GCMP 2012). Volume 1
2012-08-02
mapping, the complete DISA technical baseline, and the GIG Technical Guidance ( GTG ). The Department of Defense (DoD), as part of its IT Effectiveness...Guidance ( GTG ) to guide their development of service offerings, which are added to the technical baseline when approved by the CEP. 1.2. Background...corresponding hyperlinks; the complete set of GTPs is called the GIG Technical Guidance ( GTG ). These appendices also contain linkages between the GCMP
Mendiratta-Lala, Mishal; Williams, Todd R; Mendiratta, Vivek; Ahmed, Hafeez; Bonnett, John W
2015-04-01
The purpose of this study was to evaluate the effectiveness of a multifaceted simulation-based resident training for CT-guided fluoroscopic procedures by measuring procedural and technical skills, radiation dose, and procedure times before and after simulation training. A prospective analysis included 40 radiology residents and eight staff radiologists. Residents took an online pretest to assess baseline procedural knowledge. Second-through fourth-year residents' baseline technical skills with a procedural phantom were evaluated. First-through third-year residents then underwent formal didactic and simulation-based procedural and technical training with one of two interventional radiologists and followed the training with 1 month of supervised phantom-based practice. Thereafter, residents underwent final written and practical examinations. The practical examination included essential items from a 20-point checklist, including site and side marking, consent, time-out, and sterile technique along with a technical skills portion assessing pedal steps, radiation dose, needle redirects, and procedure time. The results indicated statistically significant improvement in procedural and technical skills after simulation training. For residents, the median number of pedal steps decreased by three (p=0.001), median dose decreased by 15.4 mGy (p<0.001), median procedure time decreased by 4.0 minutes (p<0.001), median number of needle redirects decreased by 1.0 (p=0.005), and median number of 20-point checklist items successfully completed increased by three (p<0.001). The results suggest that procedural skills can be acquired and improved by simulation-based training of residents, regardless of experience. CT simulation training decreases procedural time, decreases radiation dose, and improves resident efficiency and confidence, which may transfer to clinical practice with improved patient care and safety.
Coordinating activities between NOAA and other agencies.
Fritz, A T; Buchman, M F
1997-11-01
The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) mandate protection of public health, welfare, and the environment at Superfund hazardous waste sites. The NCP requires lead response agenciesto integrate baseline risk assessments into the remedial process that "assess threats to the environment." EPA policy statements direct regional offices to perform thorough, consistent ecological risk assessments, and stress the importance of coordination and technical consultation with the natural resource trustees. As a Federal natural trustee, the National Oceanic and Atmospheric Administration's (NOAA) role and responsibilities within the CERCLA process also are defined and mandated by Federal law. NOAA is responsible for identifying sites in the coastal zone that may affect natural resources, evaluating injury to trust resources, and providing technical advice on assessments and remedial and restoration alternatives. Statutes require lead cleanup agencies and trustee agencies to notify and coordinate with each other during CERCLA response. Over the past ten years, NOAA has gained valuable experience and technical expertise in environmental assessments and in evaluating contaminated aquatic environments. NOAA fulfills its responsibilities through an effective network of Coastal Resource Coordinators (CRCs) who can rapidly respond to local technical requirements and priorities, and coordinate effectively with technical and trustee representatives. In addition to CRCs, an interdisciplinary support group provides technical expertise in the scientific disciplines required to respond to the needs of regional activities. NOAA provides CRCs to coastal EPA regional offices for technical support, and to act as liaisons with Federal and state natural resource trustee agencies. The CRCs help EPA and other lead response agencies identify and assess risks to coastal resources from hazardous waste sites and to develop cost-effective strategies to minimize those risks. Notification of trustees of potential natural resource injuries and coordination of subsequent investigations helps Federal and state trustees to carry out their responsibilities effectively. Trustees' early involvement in the scoping of ecological risk assessments ensures that assessments and the entire remedial process adequately evaluate the risk to trust resources. Coordination throughout the process makes it easier to develop cost-effective and protective remedies that enhance the recovery of natural resources. Examples of NOAA's successful coordination and cooperative ecological risk assessments will be presented in brief case studies for both EPA and Department of Defense (DOD) lead sites.
Solid Waste Program technical baseline description
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlson, A.B.
1994-07-01
The system engineering approach has been taken to describe the technical baseline under which the Solid Waste Program is currently operating. The document contains a mission analysis, function analysis, system definition, documentation requirements, facility and project bases, and uncertainties facing the program.
Baseline geochemistry of soil and bedrock Tshirege Member of the Bandelier Tuff at MDA-P
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warren, R.G.; McDonald, E.V.; Ryti, R.T.
1997-08-01
This report provides baseline geochemistry for soils (including fill), and for bedrock within three specific areas that are planned for use in the remediation of Material Disposal Area P (MDA-P) at Technical Area 16 (TA-16). The baseline chemistry includes leachable element concentrations for both soils and bedrock and total element concentrations for all soil samples and for two selected bedrock samples. MDA-P operated from the early 1950s to 1984 as a landfill for rubble and debris generated by the burning of high explosives (HE) at the TA-16 Burning Ground, HE-contaminated equipment and material, barium nitrate sand, building materials, and trash.more » The aim of this report is to establish causes for recognizable chemical differences between the background and baseline data sets. In many cases, the authors conclude that recognizable differences represent natural enrichments. In other cases, differences are best attributed to analytical problems. But most importantly, the comparison of background and baseline geochemistry demonstrates significant contamination for several elements not only at the two remedial sites near the TA-16 Burning Ground, but also within the entire region of the background study. This contamination is highly localized very near to the surface in soil and fill, and probably also in bedrock; consequently, upper tolerance limits (UTLs) calculated as upper 95% confidence limits of the 95th percentile are of little value and thus are not provided. This report instead provides basic statistical summaries and graphical comparisons for background and baseline samples to guide strategies for remediation of the three sites to be used in the restoration of MDA-P.« less
NASA Technical Reports Server (NTRS)
Pawlikowski, Gerald J.; Dennehy, Cornelius J.
2010-01-01
The NASA Technical Fellows periodically conduct State-of-the-Discipline assessments. The GN&C Technical Fellow contracted Harlan Brown & Company in 2007 and 2009 to conduct independent, third party studies to gain unbiased insight and understanding into the attitudes and beliefs of NASA's GN&C Community of Practice (CoP). The paper first outlines the background, objectives and methodology of the studies. The paper then summarizes key study results of the 2007 baseline study, as well as the 2009 update. The update was then used to track and monitor perceptions, identify performance trends, identify areas where further improvement needs to be made in NASA's GN&C discipline. It also generated feedback on the recently developed GN&C CoP online knowledge capture and learning site.
Programmatic management of multidrug-resistant tuberculosis: models from three countries.
Furin, J; Bayona, J; Becerra, M; Farmer, P; Golubkov, A; Hurtado, R; Joseph, J K; Keshavjee, S; Ponomarenko, O; Rich, M; Shin, S
2011-10-01
Although multidrug-resistant tuberculosis (MDR-TB) is a major global health problem, there is a gap in programmatic treatment implementation. This study describes MDR-TB treatment models in three countries--Peru, Russia and Lesotho-- using qualitative data collected over a 13-year period. A program analysis is presented for each country focusing on baseline medical care, initial implementation and program evolution. A pattern analysis revealed six overarching themes common to all three programs: 1) importance of baseline assessments, 2) early identification of key collaborators, 3) identification of initial locus of care, 4) minimization of patient-incurred costs, 5) targeted interventions for vulnerable populations and 6) importance of technical assistance and funding. Site commonalities and differences in each of these areas were analyzed. It is recommended that all programs providing MDR-TB treatment address these six areas during program development and implementation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rossabi, J.; Jenkins, R.A.; Wise, M.B.
1993-12-31
The Department of Energy`s Office of Technology Development initiated an Integrated Demonstration Program at the Savannah River Site in 1989. The objective of this program is to develop, demonstrate, and evaluate innovative technologies that can improve present-day environmental restoration methods. The Integrated Demonstration Program at SRS is entitled ``Cleanup of Organics in Soils and Groundwater at Non-Arid Sites.`` New technologies in the areas of drilling, characterization, monitoring, and remediation are being demonstrated and evaluated for their technical performance and cost effectiveness in comparison with baseline technologies. Present site characterization and monitoring methods are costly, time-consuming, overly invasive, and often imprecise.more » Better technologies are required to accurately describe the subsurface geophysical and geochemical features of a site and the nature and extent of contamination. More efficient, nonintrusive characterization and monitoring techniques are necessary for understanding and predicting subsurface transport. More reliable procedures are also needed for interpreting monitoring and characterization data. Site characterization and monitoring are key elements in preventing, identifying, and restoring contaminated sites. The remediation of a site cannot be determined without characterization data, and monitoring may be required for 30 years after site closure.« less
Solar central electric power generation - A baseline design
NASA Technical Reports Server (NTRS)
Powell, J. C.
1976-01-01
The paper presents the conceptual technical baseline design of a solar electric power plant using the central receiver concept, and derives credible cost estimates from the baseline design. The major components of the plant - heliostats, tower, receiver, tower piping, and thermal storage - are discussed in terms of technical and cost information. The assumed peak plant output is 215 MW(e), over 4000 daylight hours. The contribution of total capital investment to energy cost is estimated to be about 55 mills per kwh in mid-1974 dollars.
Hanford business structure for HANDI 2000 business management system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, D.
The Hanford Business Structure integrates the project`s technical, schedule, and cost baselines; implements the use of a standard code of accounts; and streamlines performance reporting and cost collection. Technical requirements drive the technical functions and come from the RDD 100 database. The functions will be identified in the P3 scheduling system and also in the PeopleSoft system. Projects will break their work down from the technical requirements in the P3 schedules. When the level at which they want to track cost via the code of accounts is reached, a Project ID will be generated in the PeopleSoft system. P3 maymore » carry more detailed schedules below the Project ID level. The standard code of accounts will identify discrete work activities done across the site and various projects. They will include direct and overhead type work scopes. Activities in P3 will roll up to this standard code of accounts. The field that will be used to record this in PeopleSoft is ``Activity``. In Passport it is a user-defined field. It will have to be added to other feeder systems. Project ID and code of accounts are required fields on all cost records.« less
TWRS Configuration management program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.
Gaining Control and Predictability of Software-Intensive Systems Development and Sustainment
2015-02-04
implementation of the baselines, audits , and technical reviews within an overarching systems engineering process (SEP; Defense Acquisition University...warfighters’ needs. This management and metrics effort supplements and supports the system’s technical development through the baselines, audits and...other areas that could be researched and added into the nine-tier model. Areas including software metrics, quality assurance , software-oriented
Baseline and premining geochemical characterization of mined sites
Nordstrom, D. Kirk
2015-01-01
A rational goal for environmental restoration of new, active, or inactive mine sites would be ‘natural background’ or the environmental conditions that existed before any mining activities or other related anthropogenic activities. In a strictly technical sense, there is no such thing as natural background (or entirely non-anthropogenic) existing today because there is no part of the planet earth that has not had at least some chemical disturbance from anthropogenic activities. Hence, the terms ‘baseline’ and ‘pre-mining’ are preferred to describe these conditions. Baseline conditions are those that existed at the time of the characterization which could be pre-mining, during mining, or post-mining. Protocols for geochemically characterizing pre-mining conditions are not well-documented for sites already mined but there are two approaches that seem most direct and least ambiguous. One is characterization of analog sites along with judicious application of geochemical modeling. The other is reactive-transport modeling (based on careful synoptic sampling with tracer-injection) and subtracting inputs from known mining and mineral processing. Several examples of acidic drainage are described from around the world documenting the range of water compositions produced from pyrite oxidation in the absence of mining. These analog sites provide insight to the processes forming mineralized waters in areas untouched by mining. Natural analog water-chemistry data is compared with the higher metal concentrations, metal fluxes, and weathering rates found in mined areas in the few places where comparisons are possible. The differences are generally 1–3 orders of magnitude higher for acid mine drainage.
Hanford Waste Vitrification Plant technical manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larson, D.E.; Watrous, R.A.; Kruger, O.L.
1996-03-01
A key element of the Hanford waste management strategy is the construction of a new facility, the Hanford Waste Vitrification Plant (HWVP), to vitrify existing and future liquid high-level waste produced by defense activities at the Hanford Site. The HWVP mission is to vitrify pretreated waste in borosilicate glass, cast the glass into stainless steel canisters, and store the canisters at the Hanford Site until they are shipped to a federal geological repository. The HWVP Technical Manual (Manual) documents the technical bases of the current HWVP process and provides a physical description of the related equipment and the plant. Themore » immediate purpose of the document is to provide the technical bases for preparation of project baseline documents that will be used to direct the Title 1 and Title 2 design by the A/E, Fluor. The content of the Manual is organized in the following manner. Chapter 1.0 contains the background and context within which the HWVP was designed. Chapter 2.0 describes the site, plant, equipment and supporting services and provides the context for application of the process information in the Manual. Chapter 3.0 provides plant feed and product requirements, which are primary process bases for plant operation. Chapter 4.0 summarizes the technology for each plant process. Chapter 5.0 describes the engineering principles for designing major types of HWVP equipment. Chapter 6.0 describes the general safety aspects of the plant and process to assist in safe and prudent facility operation. Chapter 7.0 includes a description of the waste form qualification program and data. Chapter 8.0 indicates the current status of quality assurance requirements for the Manual. The Appendices provide data that are too extensive to be placed in the main text, such as extensive tables and sets of figures. The Manual is a revision of the 1987 version.« less
Configuration Management Plan for the Tank Farm Contractor
DOE Office of Scientific and Technical Information (OSTI.GOV)
WEIR, W.R.
The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in themore » management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.« less
Space transfer concepts and analysis for exploration missions
NASA Technical Reports Server (NTRS)
Woodcock, Gordon R.
1992-01-01
The current technical effort is part of the third phase of a broad-scoped and systematic study of space transfer concepts for human lunar and Mars missions. The study addressed the technical issues relating to the First Lunar Outpost (FLO) habitation vehicle with emphasis on the structure, power, life support system, and radiation environment for a baseline habitat with specific alternatives for the baseline.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vermeul, Vincent R.; Cole, Charles R.; Bergeron, Marcel P.
2001-08-29
The baseline three-dimensional transient inverse model for the estimation of site-wide scale flow parameters, including their uncertainties, using data on the transient behavior of the unconfined aquifer system over the entire historical period of Hanford operations, has been modified to account for the effects of basalt intercommunication between the Hanford unconfined aquifer and the underlying upper basalt confined aquifer. Both the baseline and alternative conceptual models (ACM-1) considered only the groundwater flow component and corresponding observational data in the 3-Dl transient inverse calibration efforts. Subsequent efforts will examine both groundwater flow and transport. Comparisons of goodness of fit measures andmore » parameter estimation results for the ACM-1 transient inverse calibrated model with those from previous site-wide groundwater modeling efforts illustrate that the new 3-D transient inverse model approach will strengthen the technical defensibility of the final model(s) and provide the ability to incorporate uncertainty in predictions related to both conceptual model and parameter uncertainty. These results, however, indicate that additional improvements are required to the conceptual model framework. An investigation was initiated at the end of this basalt inverse modeling effort to determine whether facies-based zonation would improve specific yield parameter estimation results (ACM-2). A description of the justification and methodology to develop this zonation is discussed.« less
Payload transportation system study
NASA Technical Reports Server (NTRS)
1976-01-01
A standard size set of shuttle payload transportation equipment was defined that will substantially reduce the cost of payload transportation and accommodate a wide range of payloads with minimum impact on payload design. The system was designed to accommodate payload shipments between the level 4 payload integration sites and the launch site during the calendar years 1979-1982. In addition to defining transportation multi-use mission support equipment (T-MMSE) the mode of travel, prime movers, and ancillary equipment required in the transportation process were also considered. Consistent with the STS goals of low cost and the use of standardized interfaces, the transportation system was designed to commercial grade standards and uses the payload flight mounting interfaces for transportation. The technical, cost, and programmatic data required to permit selection of a baseline system of MMSE for intersite movement of shuttle payloads were developed.
research, analysis, and technical assistance on municipal energy planning and policy, utility-scale Baseline Analysis of Municipal Codification across the U.S., NREL Technical Report (2016) Navajo Generating Station & Federal Resource Planning - Volume 1: Sectoral, Technical, and Economic Trends, NREL
Stanton, Neville A; Bessell, Kevin
2014-01-01
This paper presents the application of Cognitive Work Analysis to the description of the functions, situations, activities, decisions, strategies, and competencies of a Trafalgar class submarine when performing the function of returning to periscope depth. All five phases of Cognitive Work Analysis are presented, namely: Work Domain Analysis, Control Task Analysis, Strategies Analysis, Social Organisation and Cooperation Analysis, and Worker Competencies Analysis. Complex socio-technical systems are difficult to analyse but Cognitive Work Analysis offers an integrated way of analysing complex systems with the core of functional means-ends analysis underlying all of the other representations. The joined-up analysis offers a coherent framework for understanding how socio-technical systems work. Data were collected through observation and interviews at different sites across the UK. The resultant representations present a statement of how the work domain and current activities are configured in this complex socio-technical system. This is intended to provide a baseline, from which all future conceptions of the domain may be compared. The strength of the analysis is in the multiple representations from which the constraints acting on the work may be analysed. Future research needs to challenge the assumptions behind these constraints in order to develop new ways of working. Copyright © 2013 Elsevier Ltd and The Ergonomics Society. All rights reserved.
NASA Astrophysics Data System (ADS)
Nguyen, Tien M.; Guillen, Andy T.
2017-05-01
This paper describes static Bayesian game models with "Pure" and "Mixed" games for the development of an optimum Program and Technical Baseline (PTB) solution for affordable acquisition of future space systems. The paper discusses System Engineering (SE) frameworks and analytical and simulation modeling approaches for developing the optimum PTB solutions from both the government and contractor perspectives.
Spent nuclear fuel canister storage building conceptual design report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Swenson, C.E.
This Conceptual Design Report provides the technical basis for the Spent Nuclear Fuels Project, Canister Storage Building, and as amended by letter (correspondence number 9555700, M.E. Witherspoon to E.B. Sellers, ``Technical Baseline and Updated Cost Estimate for the Canister Storage Building``, dated October 24, 1995), includes the project cost baseline and Criteria to be used as the basis for starting detailed design in fiscal year 1995.
K-Basins Sludge Treatment and Packaging at the Hanford Site - 13585
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fogwell, Thomas W.; Honeyman, James O.; Stegen, Gary
Highly radioactive sludge resulting from the storage of degraded spent nuclear fuel has been consolidated in Engineered Containers (ECs) in the 105-K West Storage Basin located on the Hanford site near the Columbia River in Washington State. CH2M Hill Plateau Remediation Company (CHPRC) is proceeding with a project to retrieve the sludge, place it in Sludge Transport and Storage Containers (STSCs) and store those filled containers within the T Plant Canyon facility on the Hanford Site Central Plateau (Phase 1). Retrieval and transfer of the sludge material will enable removal of the 105-K West Basin and allow remediation of themore » subsurface contamination plumes under the basin. The U.S. Department of Energy (DOE) plans to treat and dispose of this K Basins sludge (Phase 2) as Remote Handled Transuranic Waste (RH TRU) at the Waste Isolation Pilot Plant (WIPP) located in New Mexico. The K Basin sludge currently contains uranium metal which reacts with water present in the stored slurry, generating hydrogen and other byproducts. The established transportation and disposal requirements require the transformation of the K Basins sludge to a chemically stable, liquid-free, packaged waste form. The Treatment and Packaging Project includes removal of the containerised sludge from T Plant, the treatment of the sludge as required, and packaging of all the sludge into a form that is certifiable for transportation to and disposal at WIPP. Completion of this scope will require construction and operation of a Sludge Treatment and Packaging Facility (STPF), which could be either a completely new facility or a modification of an existing Hanford Site facility. A Technology Evaluation and Alternatives Analysis (TEAA) for the STP Phase 2 was completed in 2011. A Request for Technology Information (RFI) had been issued in October 2009 to solicit candidate technologies for use in Phase 2. The RFI also included a preliminary definition of Phase 2 functions and requirements. Potentially applicable technologies were identified through a commercial procurement process, technical workshops, and review of the numerous previous sludge treatment technology studies. The identified technology approaches were screened using the criteria established in the Decision Plan, and focused bench top feasibility testing was conducted. Engineering evaluations of the costs, schedules, and technical maturity were developed and evaluated. Recommendations were developed based on technical evaluations. The criteria used in the evaluation process were as follows: (1) Safety, (2) Regulatory/stakeholder acceptance, (3) Technical maturity, (4) Operability and maintainability, (5) Life cycle cost and schedule, (6) Potential for beneficial integration with ongoing STP-Phase 1 activities, and (7) Integration with Site-wide RH-TRU processing/packaging, planning, schedule, and approach. The TEAA recommended Warm Water Oxidation (WWO) as the baseline treatment technology and two risk reduction enhancement options for further consideration during development of the process - size reduction and chemical oxidation (Fenton's reagent). The enhancement options would potentially allow a useful reduction in the total operating time required to process the K Basins sludge. The U.S. Department of Energy's Richland Field Office (DOE-RL) has approved this recommended technical approach. The baseline process can be broken down into the following main process steps: (1) STSC transfer from T Plant to the Sludge Treatment and Packaging Facility (STPF). (2) Retrieval of sludge from the STSCs and transfer to the Receipt and Reaction Tank (RRT). (3) Preparation for immobilization by oxidation using heated water (i.e., WWO) for those batches that require it and concentration by evaporating water at about atmospheric pressure in the RRT. (4) Immobilization by using additives to eliminate free liquids and packaging of the treated sludge into drums. (5) Inspection and handling of the filled drums prior to transfer to a separate storage and shipping facility. (6) Handling of vapor, condensate, and other waste streams generated by the process. Each of these steps is discussed in the paper, together with the current state of progress in developing the technology and requirements for continued development. A schematic of the recommended baseline WWO treatment process is given below. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniel F. Ancona III; Kathryn E. George; Richard P. Bowers
This study, supported by the US Department of Energy, Wind Powering America Program, Maryland Department of Natural Resources and Chesapeake Bay Foundation, analyzed barriers to wind energy development in the Mid-Atlantic region along with options for overcoming or mitigating them. The Mid-Atlantic States including Delaware, Maryland, North Carolina and Virginia, have excellent wind energy potential and growing demand for electricity, but only two utility-scale projects have been installed to date. Reasons for this apathetic development of wind resources were analyzed and quantified for four markets. Specific applications are: 1) Appalachian mountain ridgeline sites, 2) on coastal plains and peninsulas, 3)more » at shallow water sites in Delaware and Chesapeake Bays, Albemarle and Pamlico Sounds, and 4) at deeper water sites off the Atlantic coast. Each market has distinctly different opportunities and barriers. The primary barriers to wind development described in this report can be grouped into four categories; state policy and regulatory issues, wind resource technical uncertainty, economic viability, and public interest in environmental issues. The properties of these typologies are not mutually independent and do interact. The report concluded that there are no insurmountable barriers to land-based wind energy projects and they could be economically viable today. Likewise potential sites in sheltered shallow waters in regional bay and sounds have been largely overlooked but could be viable currently. Offshore ocean-based applications face higher costs and technical and wind resource uncertainties. The ongoing research and development program, revision of state incentive policies, additional wind measurement efforts, transmission system expansion, environmental baseline studies and outreach to private developers and stakeholders are needed to reduce barriers to wind energy development.« less
NASA Technical Reports Server (NTRS)
Ryan, J. W.; Ma, C.; Caprette, D. S.
1993-01-01
The Goddard VLBI group reports the results of analyzing 1648 Mark 3 data sets acquired from fixed and mobile observing sites through the end of 1991, and available to the Crustal Dynamics Project. Two large solutions were used to obtain Earth rotation parameters, nutation offsets, radio source positions, site positions, site velocities, and baseline evolution. Site positions are tabulated on a yearly basis for 1979 to 1995, inclusive. Site velocities are presented in both geocentric Cartesian and topocentric coordinates. Baseline evolution is plotted for 200 baselines, and individual length determinations are presented for an additional 356 baselines. This report includes 155 quasar radio sources, 96 fixed stations and mobile sites, and 556 baselines.
Site Guidelines for a "Making Middle Grades Work" Technical Review Visit
ERIC Educational Resources Information Center
Southern Regional Education Board, 2004
2004-01-01
The purpose of the Technical Review Visit (TRV) is to follow up on the actions taken to implement the recommendations indicated for each challenge in the most recent Technical Assistance Visit (TAV) report. This document provides the following: (1) Site Guidelines for the Making Middle Grades Work (MMGW) Technical Review Visit; (2) Site Checklist;…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Looney, B.; Eddy-Dilek, C.; Costanza, J.
2008-12-15
The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issuedmore » by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are recommended, the team should identify the type of injection and target soil horizon for these injections; (2) Consider the feasibility of declaring Technical Impracticability and proceeding with the RCRA Cap for the X-701B; and (3) Provide a summary of other cost-effective technologies that could be implemented (especially for the lower Gallia). The Independent Technical Review team focused its evaluation solely on the X-701B source zone and contaminant plume. It did not review current or planned remedial activities at other plumes, waste areas, or landfills at the Portsmouth site, nor did it attempt to integrate such activities into its recommendations for X-701B. However, the ultimate selection of a remedy for X-701B by site personnel and regulators should take into account potentially synergistic efforts at other waste areas. Assessment of remedial alternatives in the context of site-wide management practices may reveal opportunities for leveraging and savings that would not otherwise be identified. For example, the cost of source-zone excavation or construction of a permeable reactive barrier at X-701B might be substantially reduced if contaminated soil could be buried on site at an existing or planned landfill. This allowance would improve the feasibility and competitiveness of both remedies. A comprehensive examination of ongoing and future environmental activities across the Portsmouth Gaseous Diffusion Plant is necessary to optimize the selection and timing of X-701B remediation with respect to cleanup efficiency, safety, and economics. A selected group of technical experts attended the technical workshop at the Portsmouth Gaseous Diffusion Plant from November 18 through 21, 2008. During the first day of the workshop, both contractor and DOE site personnel briefed the workshop participants and took them on a tour of the X-701B site. The initial briefing was attended by representatives of Ohio EPA who participated in the discussions. On subsequent days, the team reviewed baseline data and reports, were provided additional technical information from site personnel, evaluated work plans, determined critical issues and uncertainties, and recommended alternatives. This report documents the findings and recommendations of the independent technical review team.« less
Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned
NASA Technical Reports Server (NTRS)
Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.; Humphries, W. R.
2001-01-01
Engineering design is a challenging activity for any product. Since launch vehicles are highly complex and interconnected and have extreme energy densities, their design represents a challenge of the highest order. The purpose of this document is to delineate and clarify the design process associated with the launch vehicle for space flight transportation. The goal is to define and characterize a baseline for the space transportation design process. This baseline can be used as a basis for improving effectiveness and efficiency of the design process. The baseline characterization is achieved via compartmentalization and technical integration of subsystems, design functions, and discipline functions. First, a global design process overview is provided in order to show responsibility, interactions, and connectivity of overall aspects of the design process. Then design essentials are delineated in order to emphasize necessary features of the design process that are sometimes overlooked. Finally the design process characterization is presented. This is accomplished by considering project technical framework, technical integration, process description (technical integration model, subsystem tree, design/discipline planes, decision gates, and tasks), and the design sequence. Also included in the document are a snapshot relating to process improvements, illustrations of the process, a survey of recommendations from experienced practitioners in aerospace, lessons learned, references, and a bibliography.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-12-12
This technical report presents the results of a study conducted at two alternative brine diffuser sites (A and B) proposed for the Weeks Island salt dome, together with an analysis of the potential physical, chemical, and biological effects of brine disposal for this area of the Gulf of Mexico. Brine would result from either the leaching of salt domes to form or enlarge oil storage caverns, or the subsequent use of these caverns for crude oil storage in the Strategic Petroleum Reserve (SPR) program. Brine leached from the Weeks Island salt dome would be transported through a pipeline which wouldmore » extend from the salt dome either 27 nautical miles (32 statute miles) for Site A, or 41 nautical miles (47 statute miles) for Site B, into Gulf waters. The brine would be discharged at these sites through an offshore diffuser at a sustained peak rate of 39 ft/sup 3//sec. The disposal of large quantities of brine in the Gulf could have a significant impact on the biology and water quality of the area. Physical and chemical measurements of the marine environment at Sites A and B were taken between September 1977 and July 1978 to correlate the existing environmental conditions with the estimated physical extent of tthe brine discharge as predicted by the MIT model (US Dept. of Commerce, 1977a). Measurements of wind, tide, waves, currents, and stratification (water column structure) were also obtained since the diffusion and dispersion of the brine plume are a function of the local circulation regime. These data were used to calculate both near- and far-field concentrations of brine, and may also be used in the design criteria for diffuser port configuration and verification of the plume model. Biological samples were taken to characterize the sites and to predict potential areas of impact with regard to the discharge. This sampling focused on benthic organisms and demersal fish. (DMC)« less
Telemedicine information analysis center.
Zajtchuk, Joan T; Zajtchuk, Russ; Petrovic, Joseph J; Gutz, Ryan P; Walrath, Benjamin D
2004-01-01
Congress mandated a pilot project to demonstrate the feasibility of establishing a Department of Defense (DoD) telemedicine information analysis center (TIAC). The project developed a medical information support system to show the core capabilities of a TIAC. The productivity and effectiveness of telemedicine researchers and clinical practitioners can be enhanced by the existence of an information analysis center (IACs) devoted to the collection, analysis, synthesis, and dissemination of worldwide scientific and technical information related to the field of telemedicine. The work conducted under the TIAC pilot project establishes the basic IAC functions and assesses the utility of the TIAC to the military medical departments. The pilot project capabilities are Web-based and include: (1) applying the science of classification (taxonomy) to telemedicine to identify key words; (2) creating a relational database of this taxonomy to a bibliographic database using these key words; (3) developing and disseminating information via a public TIAC Web site; (4) performing a specific baseline technical area task for the U.S. Army Medical Command; and (5) providing analyses by subject matter experts.
Assessing Non-Technical Site Suitability Criteria for Stormwater Capture, Treatment and Recharge
NASA Astrophysics Data System (ADS)
Eisenstein, W.
2016-12-01
This presentation will describe a new method for assessing non-technical site suitability criteria for the siting of stormwater capture, treatment and recharge (or stormwater CTR) facilities in Sonoma County, California, USA. "Non-technical site suitability criteria" include issues such as community acceptance, aesthetics, nuisances and hazards, and compatibility with neighboring land uses, and are distinguished from "technical criteria" such as hydrology and soil characteristics that are the traditional subject of suitability analyses. Non-technical criteria are rarely, if ever, considered in formal siting suitability studies conducted by agencies and municipalities, yet can be fatal to the prospects of a given project's construction if not identified and mitigated. The researchers developed a new method for identifying and spatially characterizing relevant non-technical criteria through interviews and questionnaires with community stakeholders, and introducing those criteria into a spatial multi-criteria decision analysis framework that assesses site suitabilty across a study watershed (the Upper Petaluma River watershed in Sonoma County).
Adapting an Agent-Based Model of Socio-Technical Systems to Analyze Security Failures
2016-10-17
total number of non-blackouts differed from the total number in the baseline data to a statistically significant extent with a p- valueɘ.0003...the total number of non-blackouts differed from the total number in the baseline data to a statistically significant extent with a p-valueɘ.0003...I. Nikolic, and Z. Lukszo, Eds., Agent-based modelling of socio-technical systems. Springer Science & Business Media, 2013, vol. 9. [12] A. P. Shaw
Code of Federal Regulations, 2011 CFR
2011-07-01
... baseline or trend assessment surveys under section 102 of the Act. 228.13 Section 228.13 Protection of... SITES FOR OCEAN DUMPING § 228.13 Guidelines for ocean disposal site baseline or trend assessment surveys under section 102 of the Act. The purpose of a baseline or trend assessment survey is to determine the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... baseline or trend assessment surveys under section 102 of the Act. 228.13 Section 228.13 Protection of... SITES FOR OCEAN DUMPING § 228.13 Guidelines for ocean disposal site baseline or trend assessment surveys under section 102 of the Act. The purpose of a baseline or trend assessment survey is to determine the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... baseline or trend assessment surveys under section 102 of the Act. 228.13 Section 228.13 Protection of... SITES FOR OCEAN DUMPING § 228.13 Guidelines for ocean disposal site baseline or trend assessment surveys under section 102 of the Act. The purpose of a baseline or trend assessment survey is to determine the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... baseline or trend assessment surveys under section 102 of the Act. 228.13 Section 228.13 Protection of... SITES FOR OCEAN DUMPING § 228.13 Guidelines for ocean disposal site baseline or trend assessment surveys under section 102 of the Act. The purpose of a baseline or trend assessment survey is to determine the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... baseline or trend assessment surveys under section 102 of the Act. 228.13 Section 228.13 Protection of... SITES FOR OCEAN DUMPING § 228.13 Guidelines for ocean disposal site baseline or trend assessment surveys under section 102 of the Act. The purpose of a baseline or trend assessment survey is to determine the...
Coal gasifier cogeneration powerplant project
NASA Technical Reports Server (NTRS)
Shure, L. I.; Bloomfield, H. S.
1980-01-01
Industrial cogeneration and utility pr systems were analyzed and a conceptual design study was conducted to evaluate the economic feasibility of a coal gasifier power plant for NASA Lewis Research Center. Site location, plant size, and electric power demand were considered in criteria developed for screening and selecting candidates that could use a wide variety of coals, including that from Ohio. A fluidized bed gasifier concept was chosen as the baseline design and key components of the powerplant were technically assessed. No barriers to environmental acceptability are foreseen. If funded, the powerplant will not only meet the needs of the research center, but will reduce the commercial risk for utilities and industries by fully verifying and demonstrating the technology, thus accelerating commercialization.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-26
... Systems, Including On-Site Leased Workers From Technical Needs and National Engineering, Nashua, New... to the production of electrical connectors and backplane assemblies. The subject worker group includes on-site leased workers from Technical Needs and National Engineering. Workers of the subject firm...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-72,924] Heritage Aviation, Ltd., Including On-Site Leased Workers From Global Technical Services and Global, Inc. (Global Employment... from Heritage Aviation, Ltd, including on-site leased workers from Global Technical Services, Grand...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... Health Care and Advantage Technical Resourcing, Saginaw, MI; Amended Certification Regarding Eligibility... on-site leased workers from Advantage Technical Resourcing were employed on-site at the Saginaw... Department is amending this certification to include workers leased from Advantage Technical Resourcing...
NASA Astrophysics Data System (ADS)
Zhou, Y.; Mao, H.; Demerjian, K.; Hogrefe, C.; Liu, J.
2017-09-01
Interannual variability in baseline carbon monoxide (CO) and ozone (O3), defined as mixing ratios under minimal influence of recent and local emissions, was studied for seven rural sites in the Northeast US over 2001-2010. Annual baseline CO exhibited statistically significant decreasing trends (-4.3 to -2.3 ppbv yr-1), while baseline O3 did not display trends at any site. In examining the data by season, wintertime and springtime baseline CO at the two highest sites (1.5 km and 2 km asl) did not experience significant trends. Decadal increasing trends (∼2.55 ppbv yr-1) were found in springtime and wintertime baseline O3 in southern New Hampshire, which was associated with anthropogenic NOx emission reductions from the urban corridor. Biomass burning emissions impacted summertime baseline CO with ∼38% variability from wildfire emissions in Russia and ∼22% from Canada at five sites and impacted baseline O3 at the two high elevation sites only with ∼27% variability from wildfires in both Russia and Canada. The Arctic Oscillation was negatively correlated with summertime baseline O3, while the North Atlantic Oscillation was positively correlated with springtime baseline O3. This study suggested that anthropogenic and biomass burning emissions, and meteorological conditions were important factors working together to determine baseline O3 and CO in the Northeast U.S. during the 2000s.
Deployment Effects of Marine Renewable Energy Technologies: Wave Energy Scenarios
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mirko Previsic
2010-06-17
Given proper care in siting, design, deployment, operation and maintenance, wave energy conversion could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that, due to a lack of technical certainty, many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood,. Inmore » September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based assessment to the emerging hydrokinetic technology sector in order to evaluate the potential impact of these technologies on the marine environment and navigation constraints. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios capture variations in technical approaches and deployment scales to properly identify and characterize environmental effects and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential range of technical attributes and potential effects of these emerging technologies and focus all stakeholders on the critical issues that need to be addressed. By identifying and addressing navigational and environmental concerns in the early stages of the industry’s development, serious mistakes that could potentially derail industry-wide development can be avoided. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory issues (Pacific Energy Ventures) and navigational issues (PCCI). The results of this study are structured into three reports: (1) Wave power scenario description (2) Tidal power scenario description (3) Framework for Identifying Key Environmental Concerns This is the first report in the sequence and describes the results of conceptual feasibility studies of wave power plants deployed in Humboldt County, California and Oahu, Hawaii. These two sites contain many of the same competing stakeholder interactions identified at other wave power sites in the U.S. and serve as representative case studies. Wave power remains at an early stage of development. As such, a wide range of different technologies are being pursued by different manufacturers. In order to properly characterize potential effects, it is useful to characterize the range of technologies that could be deployed at the site of interest. An industry survey informed the process of selecting representative wave power devices. The selection criteria requires that devices are at an advanced stage of development to reduce technical uncertainties, and that enough data are available from the manufacturers to inform the conceptual design process of this study. Further, an attempt is made to cover the range of different technologies under development to capture variations in potential environmental effects. Table 1 summarizes the selected wave power technologies. A number of other developers are also at an advanced stage of development, but are not directly mentioned here. Many environmental effects will largely scale with the size of the wave power plant. In many cases, the effects of a single device may not be measurable, while larger scale device arrays may have cumulative impacts that differ significantly from smaller scale deployments. In order to characterize these effects, scenarios are established at three deployment scales which nominally represent (1) a small pilot deployment, (2) a small commercial deployment, and (3) a large commercial scale plant. It is important to understand that the purpose of this study was to establish baseline scenarios based on basic device data that was provided to use by the manufacturer for illustrative purposes only.« less
Mid-Atlantic Wind - Overcoming the Challenges
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniel F. Ancona III; Kathryn E. George; Lynn Sparling
2012-06-29
This study, supported by the US Department of Energy, Wind Powering America Program, Maryland Department of Natural Resources and Chesapeake Bay Foundation, analyzed barriers to wind energy development in the Mid-Atlantic region along with options for overcoming or mitigating them. The Mid-Atlantic States including Delaware, Maryland, North Carolina and Virginia, have excellent wind energy potential and growing demand for electricity, but only two utility-scale projects have been installed to date. Reasons for this apathetic development of wind resources were analyzed and quantified for four markets. Specific applications are: 1) Appalachian mountain ridgeline sites, 2) on coastal plains and peninsulas, 3)more » at shallow water sites in Delaware and Chesapeake Bays, Albemarle and Pamlico Sounds, and 4) at deeper water sites off the Atlantic coast. Each market has distinctly different opportunities and barriers. The primary barriers to wind development described in this report can be grouped into four categories; state policy and regulatory issues, wind resource technical uncertainty, economic viability, and public interest in environmental issues. The properties of these typologies are not mutually independent and do interact. The report concluded that there are no insurmountable barriers to land-based wind energy projects and they could be economically viable today. Likewise potential sites in sheltered shallow waters in regional bay and sounds have been largely overlooked but could be viable currently. Offshore ocean-based applications face higher costs and technical and wind resource uncertainties. The ongoing research and development program, revision of state incentive policies, additional wind measurement efforts, transmission system expansion, environmental baseline studies and outreach to private developers and stakeholders are needed to reduce barriers to wind energy development.« less
Crustal dynamics project data analysis, 1991: VLBI geodetic results, 1979 - 1990
NASA Technical Reports Server (NTRS)
Ma, C.; Ryan, J. W.; Caprette, D. S.
1992-01-01
The Goddard VLBI group reports the results of analyzing 1412 Mark II data sets acquired from fixed and mobile observing sites through the end of 1990 and available to the Crustal Dynamics Project. Three large solutions were used to obtain Earth rotation parameters, nutation offsets, global source positions, site velocities, and baseline evolution. Site positions are tabulated on a yearly basis from 1979 through 1992. Site velocities are presented in both geocentric Cartesian coordinates and topocentric coordinates. Baseline evolution is plotted for 175 baselines. Rates are computed for earth rotation and nutation parameters. Included are 104 sources, 88 fixed stations and mobile sites, and 688 baselines.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-30
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 2696-033] Albany Engineering Corporation, Town of Stuyvesant, NY; Notice of Site Visit and Technical Meeting On July 12, 2011, Office of Energy Projects staff will participate in a site visit and technical meeting for the Stuyvesant...
FLARE: The Far Side Lunar Research Expedition. A design of a far side lunar observatory
NASA Technical Reports Server (NTRS)
Bishop, David W.; Chakrabarty, Rudhmala P.; Hannula, Dawn M.; Hargus, William A., Jr.; Melendrez, A. Dean; Niemann, Christopher J.; Neuenschwander, Amy L.; Padgett, Brett D.; Patel, Sanjiv R.; Wiesehuegel, Leland J.
1991-01-01
This document outlines the design completed by members of Lone Star Aerospace, Inc. (L.S.A.) of a lunar observatory on the far side of the Moon. Such a base would not only establish a long term human presence on the Moon, but would also allow more accurate astronomical data to be obtained. A lunar observatory is more desirable than an Earth based observatory for the following reasons: instrument weight is reduced due to the Moon's weaker gravity; near vacuum conditions exist on the Moon; the Moon has slow rotation to reveal the entire sky; and the lunar surface is stable for long baseline instruments. All the conditions listed above are favorable for astronomical data recording. The technical aspects investigated in the completion of this project included site selection, mission scenario, scientific instruments, communication and power systems, habitation and transportation, cargo spacecraft design, thermal systems, robotic systems, and trajectory analysis. The site selection group focused its efforts on finding a suitable location for the observatory. Hertzsprung, a large equatorial crater on the eastern limb, was chosen as the base site.
Under this task, technical support is provided to Regional Remedial Project Managers (RPMs)/On-Scene Coordinators (OSCs) at Superfund, RCRA, and Brownfields sites contaminated with hazardous materials by the Technical Support Center (TSC) for Monitoring and Site Characterization....
Functions and requirements document for interim store solidified high-level and transuranic waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith-Fewell, M.A., Westinghouse Hanford
1996-05-17
The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less
THE EFFECT OF FEEDBACK ON THE ACCURACY OF CHECKLIST COMPLETION DURING INSTRUMENT FLIGHT TRAINING
Rantz, William G; Dickinson, Alyce M; Sinclair, Gilbert A; Van Houten, Ron
2009-01-01
This study examined whether pilots completed airplane checklists more accurately when they receive postflight graphic and verbal feedback. Participants were 8 college students who are pilots with an instrument rating. The task consisted of flying a designated flight pattern using a personal computer aviation training device (PCATD). The dependent variables were the number of checklist items completed correctly. A multiple baseline design across pairs of participants with withdrawal of treatment was employed in this study. During baseline, participants were given postflight technical feedback. During intervention, participants were given postflight graphic feedback on checklist use and praise for improvements along with technical feedback. The intervention produced near perfect checklist performance, which was maintained following a return to the baseline conditions. PMID:20190914
Space-based solar power conversion and delivery systems study. Volume 2: Engineering analysis
NASA Technical Reports Server (NTRS)
1977-01-01
The technical and economic feasibility of Satellite Solar Power Systems was studied with emphasis on the analysis and definition of an integrated strawman configuration concept, from which credible cost data could be estimated. Specifically, system concepts for each of the major subprogram areas were formulated, analyzed, and iterated to the degree necessary for establishing an overall, workable baseline system design. Cost data were estimated for the baseline and used to conduct economic analyses. The baseline concept selected was a 5-GW crystal silicon truss-type photovoltaic configuration, which represented the most mature concept available. The overall results and major findings, and the results of technical analyses performed during the final phase of the study efforts are reported.
International Linear Collider Technical Design Report (Volumes 1 through 4)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrison M.
2013-03-27
The design report consists of four volumes: Volume 1, Executive Summary; Volume 2, Physics; Volume 3, Accelerator (Part I, R and D in the Technical Design Phase, and Part II, Baseline Design); and Volume 4, Detectors.
NASA Space Geodesy Program: GSFC data analysis, 1993. VLBI geodetic results 1979 - 1992
NASA Technical Reports Server (NTRS)
Ma, Chopo; Ryan, James W.; Caprette, Douglas S.
1994-01-01
The Goddard VLBI group reports the results of analyzing Mark 3 data sets acquired from 110 fixed and mobile observing sites through the end of 1992 and available to the Space Geodesy Program. Two large solutions were used to obtain site positions, site velocities, baseline evolution for 474 baselines, earth rotation parameters, nutation offsets, and radio source positions. Site velocities are presented in both geocentric Cartesian and topocentric coordinates. Baseline evolution is plotted for the 89 baselines that were observed in 1992 and positions at 1988.0 are presented for all fixed stations and mobile sites. Positions are also presented for quasar radio sources used in the solutions.
76 FR 79675 - Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting On January 18, 2012, Office of Energy Projects staff will hold a site visit and technical meeting for the proposed Pomperaug Hydro Project (FERC...
This technical memorandum briefly describes the site and proposed conceptual site plan, indicates conceptual design considerations, specifies recommended green and sustainable features, and offers other recommendations
Web-based technical assistance and training to promote community tobacco control policy change.
Young, Walter F; Montgomery, Debbie; Nycum, Colleen; Burns-Martin, Lavon; Buller, David B
2006-01-01
In 1998 the tobacco industry was released of claims that provided monetary relief for states. A significant expansion of tobacco control activity in many states created a need to develop local capacity. Technical assistance and training for new and experienced staff became a significant challenge for tobacco control leadership. In Colorado, this challenge was addressed in part through the development of a technical assistance and training Web site designed for local tobacco control staff and coalition members. Researchers, technical Web site development specialists, state health agency, and state tobacco control coalition staff collaborated to develop, promote, and test the efficacy of this Web site. The work group embodied a range of skills including tobacco control, Web site technical development, marketing, training, and project management. Persistent marketing, updating of Web site content, and institutionalizing it as a principal source of information and training were key to use by community coalition members.
48 CFR 34.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... inherent risks in offerors'/contractors' performance plans and the underlying management control systems...) The degree to which the management process provides effective and integrated technical/schedule/cost... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Integrated Baseline...
48 CFR 1034.202 - Integrated Baseline Reviews.
Code of Federal Regulations, 2011 CFR
2011-10-01
... which the management process provides effective and integrated technical/schedule/cost planning and... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Integrated Baseline... SPECIAL CATEGORIES OF CONTRACTING MAJOR SYSTEM ACQUISITION Earned Value Management System 1034.202...
Technical Basis for PNNL Beryllium Inventory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Michelle Lynn
2014-07-09
The Department of Energy (DOE) issued Title 10 of the Code of Federal Regulations Part 850, “Chronic Beryllium Disease Prevention Program” (the Beryllium Rule) in 1999 and required full compliance by no later than January 7, 2002. The Beryllium Rule requires the development of a baseline beryllium inventory of the locations of beryllium operations and other locations of potential beryllium contamination at DOE facilities. The baseline beryllium inventory is also required to identify workers exposed or potentially exposed to beryllium at those locations. Prior to DOE issuing 10 CFR 850, Pacific Northwest Nuclear Laboratory (PNNL) had documented the beryllium characterizationmore » and worker exposure potential for multiple facilities in compliance with DOE’s 1997 Notice 440.1, “Interim Chronic Beryllium Disease.” After DOE’s issuance of 10 CFR 850, PNNL developed an implementation plan to be compliant by 2002. In 2014, an internal self-assessment (ITS #E-00748) of PNNL’s Chronic Beryllium Disease Prevention Program (CBDPP) identified several deficiencies. One deficiency is that the technical basis for establishing the baseline beryllium inventory when the Beryllium Rule was implemented was either not documented or not retrievable. In addition, the beryllium inventory itself had not been adequately documented and maintained since PNNL established its own CBDPP, separate from Hanford Site’s program. This document reconstructs PNNL’s baseline beryllium inventory as it would have existed when it achieved compliance with the Beryllium Rule in 2001 and provides the technical basis for the baseline beryllium inventory.« less
NASA Technical Reports Server (NTRS)
1972-01-01
An analysis and design effort was conducted as part of the study of solid rocket motor for a space shuttle booster. The 156-inch-diameter, parallel burn solid rocket motor was selected as its baseline because it is transportable and is the most cost-effective, reliable system that has been developed and demonstrated. The basic approach was to concentrate on the selected baseline design, and to draw from the baseline sufficient data to describe the alternate approaches also studied. The following conclusions were reached with respect to technical feasibility of the use of solid rocket booster motors for the space shuttle vehicle: (1) The 156-inch, parallel-burn baseline SRM design meets NASA's study requirements while incorporating conservative safety factors. (2) The solid rocket motor booster represents a cost-effective approach. (3) Baseline costs are conservative and are based on a demonstrated design. (4) Recovery and reuse are feasible and offer substantial cost savings. (5) Abort can be accomplished successfully. (6) Ecological effects are acceptable.
Development of Hydrogen Education Programs for Government Officials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baxter, Shannon; Keller, Russ
1. Subcontractor/Technical Subject Matter Expert (Tasks 1-3) 2. Technical lead for LFG cleanup and hydrogen production systems Support for Feasibility Study 3. Technical Lead for Feasibility Study Coordination of site preparation activities for all project equipment 4. Host site
The unbearable lightness of technocratic efforts at dengue control.
Toledo, Maria E; Baly, Alberto; Vanlerberghe, Veerle; Rodríguez, Maritza; Benitez, Juan R; Duvergel, Jacinto; Van der Stuyft, Patrick
2008-05-01
To identify key elements that should provide an added value and assure sustainable effects of the deployment of technical tools for Aedes aegypti control. An observational study was conducted between April 2001 and March 2002 in 30 blocks (1574 houses) in the central zone of Guantanamo city. A trial that combined two complementary technical interventions, the distribution of new ground level water tanks and the intensive use of insecticide, was nested in May 2001. Another 30 blocks (1535 houses) were selected as control area. We assessed community perceptions and household risk behaviour at baseline and after 9 months, and measured the trial's impact through entomological indices. Perceived self efficacy to solve A. aegypti infestation and prevent dengue was not modified. We found no changes in behaviour. In the study area the container indices decreased significantly from 0.7% before to 0.1% 1 month after the intervention. Six months later, they had increased to 2.7% and uncovered new water tanks constituted 75.9% of all breeding sites. Over the 9 months after the trial the average monthly house indices were similar in the study and control areas. A technical approach and lack of community involvement in the trial's implementation were the main causes of these short-lived results. Top-down deployment of technical tools without active involvement of the community has a temporary effect and does not lead to the behavioural changes necessary for sustainable A. aegypti control.
Gutin, Sarah A; Amico, K Rivet; Hunguana, Elsa; Munguambe, António Orlando; Rose, Carol Dawson
Positive health, dignity, and prevention (PHDP) is Mozambique's strategy to engage clinicians in the delivery of prevention messages to their HIV-positive clients. This national implementation strategy uses provider trainings on offering key messages and focuses on intervening on 9 evidence-based risk reduction areas. We investigated the impact of longitudinal technical assistance (TA) as an addition to this basic training. We followed 153 healthcare providers in 5 Mozambican provinces over 6 months to evaluate the impact of on-site, observation-based TA on PHDP implementation. Longitudinal multilevel models were estimated to model change in PHDP message delivery over time among individual providers. With each additional TA visit, providers delivered about 1 additional PHDP message ( P < .001); clinicians and nonclinicians started at about the same baseline level, but clinicians improved more quickly ( P = .004). Message delivery varied by practice sector; maternal and child health sectors outperformed other sectors. Longitudinal TA helped reach the programmatic goals of the PHDP program in Mozambique.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hale, Richard Edward; Cetiner, Sacit M.; Fugate, David L.
The Small Modular Reactor (SMR) Dynamic System Modeling Tool project is in the third year of development. The project is designed to support collaborative modeling and study of various advanced SMR (non-light water cooled) concepts, including the use of multiple coupled reactors at a single site. The objective of the project is to provide a common simulation environment and baseline modeling resources to facilitate rapid development of dynamic advanced reactor SMR models, ensure consistency among research products within the Instrumentation, Controls, and Human-Machine Interface (ICHMI) technical area, and leverage cross-cutting capabilities while minimizing duplication of effort. The combined simulation environmentmore » and suite of models are identified as the Modular Dynamic SIMulation (MoDSIM) tool. The critical elements of this effort include (1) defining a standardized, common simulation environment that can be applied throughout the program, (2) developing a library of baseline component modules that can be assembled into full plant models using existing geometry and thermal-hydraulic data, (3) defining modeling conventions for interconnecting component models, and (4) establishing user interfaces and support tools to facilitate simulation development (i.e., configuration and parameterization), execution, and results display and capture.« less
Technical Report Interchange Through Synchronized OAI Caches
NASA Technical Reports Server (NTRS)
Liu, Xiaming; Maly, Kurt; Zubair, Mohammad; Tang, Rong; Padshah, Mohammad Imran; Roncaglia, George; Rocker, JoAnne; Nelson, Michael; vonOfenheim, William; Luce, Richard
2002-01-01
The Technical Report Interchange project is a cooperative experimental effort between NASA Langley Research Center, Los Alamos National Laboratory, Air Force Research Laboratory, Sandia National Laboratory and Old Dominion University to allow for the integration of technical reports. This is accomplished using the Open Archives Initiative Protocol for Metadata Harvesting (OAI-PMH) and having each site cache the metadata from the other participating sites. Each site also implements additional software to ingest the OAI-PMH harvested metadata into their native digital library (DL). This allows the users at each site to see an increased technical report collection through the familiar DL interfaces and tale advantage of whatever valued added are provided by the native DL.
CALS Baseline Architecture Analysis of Weapons System. Technical Information: Army, Draft. Volume 8
DOT National Transportation Integrated Search
1989-09-01
This effort was performed to provide a common framework for analysis and planning of CALS initiatives across the military services, leading eventually to the development of a common DoD-wide architecture for CALS. This study addresses Army technical ...
Development Of An Agroforestry Sequestration Project In KhammamDistrict Of India
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sudha, P.; Ramprasad, V.; Nagendra, M.D.V.
2007-06-01
Large potential for agroforestry as a mitigation option hasgiven rise to scientific and policy questions. This paper addressesmethodological issues in estimating carbon sequestration potential,baseline determination, additionality and leakage in Khammam district,Andhra Pradesh, southern part of India. Technical potential forafforestation was determined considering the various landuse options. Forestimating the technical potential, culturable wastelands, fallow andmarginal croplands were considered for Eucalyptus clonal plantations.Field studies for aboveground and below ground biomass, woody litter andsoil organic carbon for baseline and project scenario were conducted toestimate the carbon sequestration potential. The baseline carbon stockwas estimated to be 45.33 tC/ha. The additional carbon sequestrationpotential under themore » project scenario for 30 years is estimated to be12.82 tC/ha/year inclusive of harvest regimes and carbon emissions due tobiomass burning and fertilizer application. The project scenario thoughhas a higher benefit cost ratio compared to baseline scenario, initialinvestment cost is high. Investment barrier exists for adoptingagroforestry in thedistrict.« less
Fort Davis National Historic Site : acoustical monitoring
DOT National Transportation Integrated Search
2013-06-01
During the summer of 2010 (September - October 2010), the Volpe Center collected baseline acoustical data at Fort Davis National Historic Site (FODA)at two sites deployed for approximately 30 days each. The baseline data collected during this period ...
Long-Term Changes in Musculoskeletal Pain Sites in the General Population: The HUNT Study.
Mundal, Ingunn; Bjørngaard, Johan Håkon; Nilsen, Tom I L; Nicholl, Barbara I; Gråwe, Rolf W; Fors, Egil Andreas
2016-11-01
In a Norwegian prospective population-based cohort study, we examined whether the number of chronic musculoskeletal pain sites changed over an 11-year period, and if the number of pain sites at follow-up was associated with health-related and lifestyle factors at baseline. The study included data on 78,973 adults participating in the Nord-Trøndelag Health Study (HUNT) in 1995 to 1997 (HUNT2) and 2006 to 2008 (HUNT3). On the basis of 3 categories of baseline pain sites, associations between baseline health-related, lifestyle, and demographic factors and number of pain sites at follow-up were analyzed with linear regression models adjusted for age, sex, marital status, physical activity, education, and other chronic diseases. We also estimated within-subject associations. Regardless of pain extent at baseline, anxiety and/or depression, sleeping problems, smoking, and obesity were positively associated with number of pain sites at follow-up, whereas education and physical activity were inversely associated with number of pain sites. The within-subject analyses showed largely similar associations for the health-related factors, whereas associations of lifestyle factors were attenuated. The mean number of pain sites remained unchanged between the 2 surveys. Overall, our study revealed prospective associations between several factors and pain sites 11 years later, regardless of the number of pain sites at baseline. This prospective study examined the association between development of pain and risk factors in the general population, on the basis of 3 categories of baseline pain sites. It also examined how these factors influence possible long-term changes in pain within individuals. We showed that having no or few baseline pain sites may not differ in its risk factors compared with having multiple pain sites. This article provides an important contribution to the ongoing debate regarding the association between lifestyle, demographic, and psychosocial risk factors, versus the course of multisite chronic pain. Additionally, we provide discussion on potential directions for clinical relevance and further research. Copyright © 2016 American Pain Society. All rights reserved.
COMSATCOM service technical baseline strategy development approach using PPBW concept
NASA Astrophysics Data System (ADS)
Nguyen, Tien M.; Guillen, Andy T.
2016-05-01
This paper presents an innovative approach to develop a Commercial Satellite Communications (COMSATCOM) service Technical Baseline (TB) and associated Program Baseline (PB) strategy using Portable Pool Bandwidth (PPBW) concept. The concept involves trading of the purchased commercial transponders' Bandwidths (BWs) with existing commercial satellites' bandwidths participated in a "designated pool bandwidth"3 according to agreed terms and conditions. Space Missile Systems Center (SMC) has been implementing the Better Buying Power (BBP 3.0) directive4 and recommending the System Program Offices (SPO) to own the Program and Technical Baseline (PTB) [1, 2] for the development of flexible acquisition strategy and achieving affordability and increased in competition. This paper defines and describes the critical PTB parameters and associated requirements that are important to the government SPO for "owning" an affordable COMSATCOM services contract using PPBW trading concept. The paper describes a step-by-step approach to optimally perform the PPBW trading to meet DoD and its stakeholders (i) affordability requirement, and (ii) fixed and variable bandwidth requirements by optimizing communications performance, cost and PPBW accessibility in terms of Quality of Services (QoS), Bandwidth Sharing Ratio (BSR), Committed Information Rate (CIR), Burstable Information Rate (BIR), Transponder equivalent bandwidth (TPE) and transponder Net Presence Value (NPV). The affordable optimal solution that meets variable bandwidth requirements will consider the operating and trading terms and conditions described in the Fair Access Policy (FAP).
Uddin, Shahadat; Mahmood, Hana; Senarath, Upul; Zahiruddin, Quazi; Karn, Sumit; Rasheed, Sabrina; Dibley, Michael
2017-06-13
Effective public policies are needed to support appropriate infant and young child feeding (IYCF) to ensure adequate child growth and development, especially in low and middle income countries. The aim of this study was to: (i) capture stakeholder networks in relation to funding and technical support for IYCF policy across five countries in South Asia (i.e. Sri Lanka, India, Nepal, Bangladesh and Pakistan); and (ii) understand how stakeholder networks differed between countries, and identify common actors and their patterns in network engagement across the region. The Net-Map method, which is an interview-based mapping technique to visualise and capture connections among different stakeholders that collaborate towards achieving a focused goal, has been used to map funding and technical support networks in all study sites. Our study was conducted at the national level in Bangladesh, India, Nepal, and Sri Lanka, as well as in selected states or provinces in India and Pakistan during 2013-2014. We analysed the network data using a social network analysis software (NodeXL). The number of stakeholders identified as providing technical support was higher than the number of stakeholders providing funding support, across all study sites. India (New Delhi site - national level) site had the highest number of influential stakeholders for both funding (43) and technical support (86) activities. Among all nine study sites, India (New Delhi - national level) and Sri Lanka had the highest number of participating government stakeholders (22) in their respective funding networks. Sri Lanka also had the highest number of participating government stakeholders for technical support (34) among all the study sites. Government stakeholders are more engaged in technical support activities compared with their involvement in funding activities. The United Nations Children's Emergency Fund (UNICEF) and the World Health Organization (WHO) were highly engaged stakeholders for both funding and technical support activities across all study sites. International stakeholders were highly involved in both the funding and technical support activities related to IYCF practices across these nine study sites. Government stakeholders received more support for funding and technical support activities from other stakeholders compared with the support that they offered. Stakeholders were, in general, more engaged for technical support activities compared with the funding activities.
Tanks focus area multiyear program plan FY97-FY99
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
The U.S. Department of Energy (DOE) continues to face a major tank remediation problem with approximately 332 tanks storing over 378,000 ml of high-level waste (HLW) and transuranic (TRU) waste across the DOE complex. Most of the tanks have significantly exceeded their life spans. Approximately 90 tanks across the DOE complex are known or assumed to have leaked. Some of the tank contents are potentially explosive. These tanks must be remediated and made safe. How- ever, regulatory drivers are more ambitious than baseline technologies and budgets will support. Therefore, the Tanks Focus Area (TFA) began operation in October 1994. Themore » focus area manages, coordinates, and leverages technology development to provide integrated solutions to remediate problems that will accelerate safe and cost-effective cleanup and closure of DOE`s national tank system. The TFA is responsible for technology development to support DOE`s four major tank sites: Hanford Site (Washington), INEL (Idaho), Oak Ridge Reservation (ORR) (Tennessee), and Savannah River Site (SRS) (South Carolina). Its technical scope covers the major functions that comprise a complete tank remediation system: safety, characterization, retrieval, pretreatment, immobilization, and closure.« less
Syrjala, Karen L.; Stover, Allison C.; Yi, Jean C.; Artherholt, Samantha B.; Romano, Eleni M.; Schoch, Gary; Stewart, Susan; Flowers, Mary E.D.
2011-01-01
Introduction The internet provides a widely accessible modality for meeting survivorship care needs of cancer survivors. In this paper we describe the development and implementation of an internet site designed as a base from which to conduct a randomized controlled trial to meet psycho-educational needs of hematopoietic stem cell transplantation (HSCT) survivors. Methods A cross-disciplinary team designed, wrote content and programmed an internet site for online study registration, consent, assessment, and study implementation. All 3–18 year survivors of HSCT for hematologic malignancy treated at one transplant center were approached by mail for participation. All study activities could be conducted without study staff contact. However, participants had options for phone or email contact with study staff as desired. Results Of 1775 participants approached for the study, 775 (58% of those eligible) consented and completed baseline assessment. Mean age was 51.7 (SD=12.5, age range 18–79), with 56% male. 57% required staff contact one or more times; a majority were for minor technical issues or delays in completion of enrollment or baseline assessment. Discussions/Conclusions This study demonstrated the potential for providing internet-based survivorship care to long-term survivors of HSCT. Although building a survivorship internet site requires a team with diverse expertise, once built, these resources can be implemented rapidly with large numbers of survivors. Implications for Cancer Survivors While internet-based services will not meet all the needs of cancer survivors, this methodology represents an important modality for augmenting onsite clinical services as a method for meeting psycho-educational, information and resource needs of cancer survivors. PMID:21544671
Site Characterization and Monitoring Technical Support Center FY16 Report
SCMTSC’s primary goal is to provide technical assistance to regional programs on complex hazardous waste site characterization issues. This annual report illustrates the range and extent of projects that SCMTSC supported in FY 2016. Our principal audiences are site project manage...
This document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will...
The document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will...
The document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will...
School-to-Work Transition of Career and Technical Education Graduates
ERIC Educational Resources Information Center
Packard, Becky Wai-Ling; Leach, Miki; Ruiz, Yedalis; Nelson, Consuelo; DiCocco, Hannah
2012-01-01
This study analyzed the career development of career and technical education (CTE) high school graduates during their school-to-work transition, specifically their adaptability in the face of barriers. Forty graduates (22 men, 18 women) from working-class backgrounds participated in baseline surveys at graduation and phenomenological interviews 1…
Global Geodesy Using GPS Without Fiducial Sites
NASA Technical Reports Server (NTRS)
Heflin, Michael B.; Blewitt, Geoffrey
1994-01-01
Global Positioning System, GPS, used to make global geodetic measurements without use of fiducial site coordinates. Baseline lengths and geocentric radii for each site determined without having to fix any site coordinates. Given n globally distributed sites, n baseline lengths and n geocentric radii form polyhedron with each site at vertex and with geocenter at intersection of all radii. Geodetic information derived from structure of polyhedron and its change with time. Approach applied to any global geodetic technique.
Surgical Practical Skills Learning Curriculum: Implementation and Interns' Confidence Perceptions.
Acosta, Danilo; Castillo-Angeles, Manuel; Garces-Descovich, Alejandro; Watkins, Ammara A; Gupta, Alok; Critchlow, Jonathan F; Kent, Tara S
To provide an overview of the practical skills learning curriculum and assess its effects over time on the surgical interns' perceptions of their technical skills, patient management, administrative tasks, and knowledge. An 84-hour practical skills curriculum composed of didactic, simulation, and practical sessions was implemented during the 2015 to 2016 academic year for general surgery interns. Totally, 40% of the sessions were held during orientation, whereas the remainder sessions were held throughout the academic year. Interns' perceptions of their technical skills, administrative tasks, patient management, and knowledge were assessed by the practical skills curriculum residents' perception survey at various time points during their intern year (baseline, midpoint, and final). Interns were also asked to fill out an evaluation survey at the completion of each session to obtain feedback on the curriculum. General Surgery Residency program at a tertiary care academic institution. 20 General Surgery categorical and preliminary interns. Significant differences were found over time in interns' perceptions on their technical skills, patient management, administrative tasks, and knowledge (p < 0.001 for all). The results were also statistically significant when accounting for a prior boot camp course in medical school, intern status (categorical or preliminary), and gender (p < 0.05 for all). Differences in interns' perceptions occurred both from baseline to midpoint, and from midpoint to final time point evaluations (p < 0.001 for all). Prior surgical boot camp in medical school status, intern status (categorical vs. preliminary), and gender did not differ in the interns' baseline perceptions of their technical skills, patient management, administrative tasks, and knowledge (p > 0.05 for all). Implementation of a Practical Skills Curriculum in surgical internships can improve interns' confidence perception on their technical skills, patient management skills, administrative tasks, and knowledge. Copyright © 2018. Published by Elsevier Inc.
Plantation establishment: site preparation and tree planting methods
J. W. Van Sambeek
2008-01-01
The Silviculture and Ecology of the Central Hardwoods research unit of the USDA Forest Service is developing a series of technical notes for the management of forest lands in the Midwest. Many of the technical notes on different aspects of hardwood plantation establishment have been completed. At the request of the editor, the technical notes for site preparation, slit...
1993-02-01
Scientific and Technical Information EXOBIOLOGY. HEALTH. MICROBIOLOGY . MICROOR- System during September 1990. Subject coverage includes: GANISMS...Houston. TX N91-24731 National Aeronautics and Space Administration. MICROBIOLOGY ON SPACE STATION FREEDOM Washington, DCr DUANE L. PIERSON, ed...and solution INASA-SP-7011(345)) p 37 N91-16547 Beyond the Baseline 1991ý Proceedings of the Space [NASA-TP-3242) p 43 N92-33483 Microbiology on Space
Technical Support for Contaminated Sites | Science Inventory ...
In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled ORD to provide effective technical assistance by ensuring ORD scientists and engineers were accessible to the Agency’s Office and Regional decision makers, including Remedial Project Managers, On-Scene Coordinators, and corrective action staff. Five ORD Technical Support Centers (TSCs) were created to facilitate this technical assistance. Three of the five TSCs are supported by the Sustainable and Healthy Communities Research Program, and are summarized in the poster being presented:• Engineering Technical Support Center (ETSC) in Cincinnati, Ohio• Ground Water Technical Support Center (GWTSC) in Ada, Oklahoma• Site Characterization and Monitoring Technical Support Center (SCMTSC) in Atlanta, GeorgiaOver the past 29 years, the Technical Support Centers have provided numerous influential products to its internal Agency clients and to those at the State level (through the EPA Regions). These products include, but are not limited to the following: Annual TSC reports from the three Centers, a hard-rock mining conference every other year, PRO-UCL software development for site characterization statistics, groundwater modeling using state-of-the-art modeling software, numerical mo
Antony, Benny; Ding, Changhai; Stannus, Oliver; Cicuttini, Flavia; Jones, Graeme
2011-09-01
To determine the association of knee bone size, cartilage volume, and body mass index (BMI) at baseline with knee cartilage loss over 2 years in younger or middle-aged adults. A total of 324 subjects (mean age 45 yrs, range 26-61) were measured at baseline and about 2 years later. Knee cartilage volume and bone size were determined using T1-weighted fat-saturated magnetic resonance imaging. In multivariable analysis, baseline knee bone size was negatively associated with annual change in knee cartilage volume at medial and lateral tibial sites (ß = -0.62% to -0.47%/cm(2), all p < 0.001). The associations disappeared at medial tibial site after adjustment for baseline cartilage volume and became of borderline statistical significance at lateral tibial site after adjustment for both baseline cartilage volume and osteophytes (ß = -0.29, p = 0.059). Baseline knee cartilage volume was consistently and negatively associated with annual change in knee cartilage volume at all 3 medial tibial, lateral tibial, and patellar sites (ß = -4.41% to -1.37%/ml, all p < 0.001). Baseline BMI was negatively associated with an annual change in knee cartilage volume, but only in subjects within the upper tertile of baseline cartilage volume, even after adjusting for cartilage defects (ß = -0.16% to -0.34%/kg/m(2), all p < 0.05). Our study suggests that both higher baseline tibial bone area and knee cartilage volume (most likely due to cartilage swelling) are associated with greater knee cartilage loss over 2 years. A higher BMI was associated with greater knee cartilage loss only in subjects with higher baseline cartilage volume.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-73,642] Intel Corporation, Fab 20... of Intel Corporation, Fab 20 Division, including on-site leased workers of Volt Technical Resources... Precision, Inc. were employed on-site at the Hillsboro, Oregon location of Intel Corporation, Fab 20...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kautsky, Mark; Findlay, Richard C.; Hodges, Rex A.
2013-07-01
Managing technical references for projects that have long histories is hampered by the large collection of documents, each of which might contain discrete pieces of information relevant to the site conceptual model. A database application has been designed to improve the efficiency of retrieving technical information for a project. Although many databases are currently used for accessing analytical and geo-referenced data, applications designed specifically to manage technical reference material for projects are scarce. Retrieving site data from the array of available references becomes an increasingly inefficient use of labor. The electronic-Knowledge Information Tool (e-KIT) is designed as a project-level resourcemore » to access and communicate technical information. The e-KIT is a living tool that grows as new information becomes available, and its value to the project increases as the volume of site information increases. Having all references assembled in one location with complete reference citations and links to elements of the site conceptual model offers a way to enhance communication with outside groups. The published and unpublished references are incorporated into the e-KIT, while the compendium of references serves as a complete bibliography for the project. (authors)« less
VLBI geodesy - 2 parts-per-billion precision in length determinations for transcontinental baselines
NASA Technical Reports Server (NTRS)
Davis, J. L.; Herring, T. A.; Shapiro, I. I.
1988-01-01
VLBI was to make twenty-two independent measurements, between September 1984 and December 1986, of the length of the 3900-km baseline between the Mojave site in California and the Haystack/Westford site in Massachusetts. These experiments differ from the typical geodetic VLBI experiments in that a large fraction of observations is obtained at elevation angles between 4 and 10 deg. Data from these low elevation angles allow the vertical coordinate of site position, and hence the baseline length, to be estimated with greater precision. For the sixteen experiments processed thus far, the weighted root-mean-square scatter of the estimates of the baseline length is 8 mm.
ERIC Educational Resources Information Center
Stipanovic, Natalie; Stringfield, Sam
2013-01-01
This qualitative study explores career counseling and guidance services as provided to students engaged in career and technical education programs at three sites in the United States. The sites, consisting of high schools and community colleges, were part of the National Research Center for Career and Technical Education's 5-year studies of…
Engineering Technical Support Center Annual Report Fiscal ...
The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol
Strategies to Save 50% Site Energy in Grocery and General Merchandise Stores
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hirsch, A.; Hale, E.; Leach, M.
2011-03-01
This paper summarizes the methodology and main results of two recently published Technical Support Documents. These reports explore the feasibility of designing general merchandise and grocery stores that use half the energy of a minimally code-compliant building, as measured on a whole-building basis. We used an optimization algorithm to trace out a minimum cost curve and identify designs that satisfy the 50% energy savings goal. We started from baseline building energy use and progressed to more energy-efficient designs by sequentially adding energy design measures (EDMs). Certain EDMs figured prominently in reaching the 50% energy savings goal for both building types:more » (1) reduced lighting power density; (2) optimized area fraction and construction of view glass or skylights, or both, as part of a daylighting system tuned to 46.5 fc (500 lux); (3) reduced infiltration with a main entrance vestibule or an envelope air barrier, or both; and (4) energy recovery ventilators, especially in humid and cold climates. In grocery stores, the most effective EDM, which was chosen for all climates, was replacing baseline medium-temperature refrigerated cases with high-efficiency models that have doors.« less
Martin, Anthony Richard; Coombes, Peter John; Harrison, Tracey Lee; Hugh Dunstan, R
2010-01-01
Microbial properties of harvested rainwater were assessed at two study sites at Newcastle on the east coast of Australia. The investigation monitored daily counts of heterotrophic bacteria (HPC), total coliforms and E. coli during a mid-winter month (July). Immediately after a major rainfall event, increases in bacterial loads were observed at both sites, followed by gradual reductions in numbers to prior baseline levels within 7 days. Baseline HPC levels ranged from 500-1000 cfu/mL for the sites evaluated, and the loads following rain peaked at 3590-6690 cfu/mL. Baseline levels of total coliforms ranged from 0-100 cfu/100 mL and peaked at 480-1200 cfu/100 mL following rain. At Site 1, there was no evidence of E. coli loading associated with the rain events assessed, and Site 2 had no detectable E.coli colonies at baseline, with a peak load of 17 cfu/100 mL following rain which again diminished to baseline levels. It was concluded that rainfall events contributed to the bacterial load in rainwater storage systems, but processes within the rainwater storage ensured these incoming loads were not sustained.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
EPA has developed this guide to provide decision-makers, such as city planners, private sector developers, and other involved in redeveloping brownfields, with a better understanding of the technical issues involved in assessing and cleaning up iron and steel mill sites so they can make the most informed decisions possible. This overview of the technical process involved in assessing and cleaning up brownfields sites can assist planners in making decisions at various stages of the project. An understanding of land use and industrial processes conducted in the past at a site can help the planner to conceptualize the site and identifymore » likely areas of contamination that may require cleanup. Numerous resources are suggested to facilitate characterization of the site and consideration of cleanup technologies.« less
ERIC Educational Resources Information Center
Pinelli, Thomas E.; Glassman, Myron
A pilot study was conducted to evaluate selected NASA (National Aeronautics and Space Administration) scientific and technical information (STI) products. The study, which utilized survey research in the form of a self-administered mail questionnaire, had a two-fold purpose--to gather baseline data on the use and perceived usefulness of selected…
NASA Astrophysics Data System (ADS)
Kuehl, C. Stephen
2003-08-01
Completing its final development and early deployment on the Navy's multi-role aircraft, the F/A-18 E/F Super Hornet, the SHAred Reconnaissance Pod (SHARP) provides the war fighter with the latest digital tactical reconnaissance (TAC Recce) Electro-Optical/Infrared (EO/IR) sensor system. The SHARP program is an evolutionary acquisition that used a spiral development process across a prototype development phase tightly coupled into overlapping Engineering and Manufacturing Development (EMD) and Low Rate Initial Production (LRIP) phases. Under a tight budget environment with a highly compressed schedule, SHARP challenged traditional acquisition strategies and systems engineering (SE) processes. Adopting tailored state-of-the-art systems engineering process models allowd the SHARP program to overcome the technical knowledge transition challenges imposed by a compressed program schedule. The program's original goal was the deployment of digital TAC Recce mission capabilities to the fleet customer by summer of 2003. Hardware and software integration technical challenges resulted from requirements definition and analysis activities performed across a government-industry led Integrated Product Team (IPT) involving Navy engineering and test sites, Boeing, and RTSC-EPS (with its subcontracted hardware and government furnished equipment vendors). Requirements development from a bottoms-up approach was adopted using an electronic requirements capture environment to clarify and establish the SHARP EMD product baseline specifications as relevant technical data became available. Applying Earned-Value Management (EVM) against an Integrated Master Schedule (IMS) resulted in efficiently managing SE task assignments and product deliveries in a dynamically evolving customer requirements environment. Application of Six Sigma improvement methodologies resulted in the uncovering of root causes of errors in wiring interconnectivity drawings, pod manufacturing processes, and avionics requirements specifications. Utilizing the draft NAVAIR SE guideline handbook and the ANSI/EIA-632 standard: Processes for Engineering a System, a systems engineering tailored process approach was adopted for the accelerated SHARP EMD prgram. Tailoring SE processes in this accelerated product delivery environment provided unique opportunities to be technically creative in the establishment of a product performance baseline. This paper provides an historical overview of the systems engineering activities spanning the prototype phase through the EMD SHARP program phase, the performance requirement capture activities and refinement process challenges, and what SE process improvements can be applied to future SHARP-like programs adopting a compressed, evolutionary spiral development acquisition paradigm.
Technical Guide for Addressing Petroleum Vapor Intrusion at Leaking Underground Storage Tank Sites
Review technical information for personnel EPA and implementing agencies for investigating and assessing petroleum vapor intrusion (PVI) at sites where petroleum hydrocarbons (PHCs) have been released from underground storage tanks (USTs).
Analysis of baseline gene expression levels from ...
The use of gene expression profiling to predict chemical mode of action would be enhanced by better characterization of variance due to individual, environmental, and technical factors. Meta-analysis of microarray data from untreated or vehicle-treated animals within the control arm of toxicogenomics studies has yielded useful information on baseline fluctuations in gene expression. A dataset of control animal microarray expression data was assembled by a working group of the Health and Environmental Sciences Institute's Technical Committee on the Application of Genomics in Mechanism Based Risk Assessment in order to provide a public resource for assessments of variability in baseline gene expression. Data from over 500 Affymetrix microarrays from control rat liver and kidney were collected from 16 different institutions. Thirty-five biological and technical factors were obtained for each animal, describing a wide range of study characteristics, and a subset were evaluated in detail for their contribution to total variability using multivariate statistical and graphical techniques. The study factors that emerged as key sources of variability included gender, organ section, strain, and fasting state. These and other study factors were identified as key descriptors that should be included in the minimal information about a toxicogenomics study needed for interpretation of results by an independent source. Genes that are the most and least variable, gender-selectiv
Wupatki National Monument : Acoustical Monitoring 2010
DOT National Transportation Integrated Search
2013-05-01
During the summer of 2010 (July - August), the Volpe Center collected baseline acoustical data at Wupatki National Monument (WUPA) at two sites deployed for approximately 30 days at each site. The baseline data collected during this period will help ...
7 CFR Exhibit F to Subpart I of... - Site Option Loan to Technical Assistance Grantees
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGENCY, DEPARTMENT OF AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical... will build their own homes by the self-help method. An SO loan will be considered only when sites... that will be needed as building sites by self-help families participating in the TA self-help housing...
ERIC Educational Resources Information Center
Wang, Jianrong; Gao, Vera
2004-01-01
This study examines sixty academic libraries' Web sites and finds that 80 percent of them do not have a technical services' homepage. Data reveal that institution's status might be a factor in whether a library has such a page. Further content analysis suggests there is an appropriate and useful public service role that technical services…
Measurement and Interpretation of Crustal Deformation Rates Associated with Postglacial Rebound
NASA Technical Reports Server (NTRS)
Davis, James L.
1993-01-01
This project involves obtaining GPS measurements in Scandinavia, and using the measurements to estimate the viscosity profile of the Earth's mantle and to correct tide-gauge measurements for the rebound effect. Below, we report on several aspects of this project. The DSGS was occupied in August 1993. This campaign also inaugurated SWEPOS, the Swedish permanent GPS network. Initial results are presented in Johansson et al., a copy of which is contained in Appendix A. An important technical advance we intend for this project is to use the full three dimensional site velocity information for inferring geophysical parameters. To this end, we have investigated using VLBI determined baseline length rates in North America to constraining proposed combinations of ice history and earth rheology, and presented this work in Mitrovica et al., a copy of which is contained in Appendix B.
This technical memorandum briefly describes the site and the master plan, indicates design constraints considered, specifies recommended LID stormwater techniques and features for sustainable redevelopment of the site, and offers other recommendations.
EML Chester - 1982. Annual report of the Regional Baseline Station at Chester, New Jersey
DOE Office of Scientific and Technical Information (OSTI.GOV)
Volchok, H.L.
1982-11-01
The Environmental Measurements Laboratory (EML) has maintained a regional baseline station at Chester, New Jersey since 1976. The site provides EML with a remote, rural facility for carrying out regional baseline research and for testing field equipment. This report updates the various programs underway at the Chester site. Separate abstracts have been prepared for the included papers. (ACR)
Baseline ecological risk assessment Salmon Site, Lamar County, Mississippi
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
The Salmon Site (SS), formerly the Tatum Dome Test Site, located in Mississippi was the site of two nuclear and two gas explosion tests conducted between 1964 and 1970. A consequence of these testing activities is that radionuclides were released into the salt dome, where they are presently contained. During reentry drilling and other site activities, incidental liquid and solid wastes that contained radioactivity were generated, resulting in some soil, ground water and equipment contamination. As part of the remedial investigation effort, a Baseline Ecological Risk Assessment was conducted at the SS. The purpose is to gauge ecological and othermore » environmental impacts attributable to past activities at the former test facility. The results of this facility-specific baseline risk assessment are presented in this document.« less
Crustal Dynamics Project data analysis, 1990
NASA Technical Reports Server (NTRS)
Caprette, D. S.; Ma, C.; Ryan, J. W.
1990-01-01
The Goddard Very Long Baseline Interferometry (VLBI) group reports the results of analyzing 1073 Mark 3 data sets acquired from fixed and mobile observing sites through the end of 1989 and available to the Crustal Dynamics Project. Two large solutions, GLB656 and GLB657, were used to establish a VLBI reference frame with an origin coincident with the ITRF89. Another large solution, GLB658, was used to obtain Earth rotation parameters, nutation offsets, and global source positions. Site velocities were obtained from another large solution, GLB659. A fifth large solution, GLB660, was used to obtain baseline evolution. Site positions are tabulated on a yearly basis from 1979 through 1992. Site velocities are presented in both Cartesian and topocentric coordinates. The results include 76 sources, 80 sites, and 422 baselines.
Special Diabetes Program for Indians: Retention in Cardiovascular Risk Reduction
Manson, Spero M.; Jiang, Luohua; Zhang, Lijing; Beals, Janette; Acton, Kelly J.; Roubideaux, Yvette
2011-01-01
Purpose: This study examined the associations between participant and site characteristics and retention in a multisite cardiovascular disease risk reduction project. Design and Methods: Data were derived from the Special Diabetes Program for Indians Healthy Heart Demonstration Project, an intervention to reduce cardiovascular risk among American Indians and Alaska Natives with diabetes. In 2006, a total of 1,072 participants from 30 participating sites completed baseline questionnaires measuring demographics and sociobehavioral factors. They also underwent a medical examination at baseline and were reassessed annually after baseline. A Provider Annual Questionnaire was administered to staff members of each grantee site at the end of each year to assess site characteristics. Generalized estimating equation models were used to evaluate the relationships between participant and site characteristics and retention 1 year after baseline. Results: Among enrolled participants, 792 (74%) completed their first annual assessment. Participants who completed the first annual assessment tended to be older and had, at baseline, higher body mass index and higher level of physical activity. Site characteristics associated with retention included average age of staff, proportion of female staff members, and percentage of staff members having completed graduate or professional school. Implications: Understanding successful retention must reach beyond individual characteristics of participants to include features of the settings that house the interventions. PMID:21565816
Obtaining Technical Support for Superfund, RCRA and Brownfields Site Issues Fact Sheet
EPA’s Technical Support Centers (TSCs) and other technical support services are available to Regional RemedialProject Managers, Corrective Action Staff, and On-Scene Coordinators needing specialized technical expertisefor specific tasks or projects.
NASA Technical Reports Server (NTRS)
Lowman, P. D.; Allenby, R. J.; Frey, H. V.
1979-01-01
Recommendations are presented for a global network of 125 sites for geodetic measurements by satellite laser ranging and very long baseline interferometry. The sites were proposed on the basis of existing facilities and scientific value for investigation of crustal dynamics as related to earthquake hazards. Tectonic problems are discussed for North America peripheral regions and for the world. The sites are presented in tables and maps, with bibliographic references.
Technical and Legal Documents: St. Louis Park Site
Technical and legal documents related to the St. Louis Park Site. Samples of ground water taken in St. Louis Park in 2005 and 2006 by the Minnesota Pollution Control Agency were found to contain volatile organic compounds – known as VOCs.
Modular space station phase B extension period executive summary
NASA Technical Reports Server (NTRS)
Tischler, A. A.; Could, C. L.
1972-01-01
A narrative summary is presented of technical, programmatic, and planning information developed during the space station definition study extension period. The modular space station is emphasized, but tasks pertaining to shuttle sorties missions and information management advanced development are included. A series of program options considering technical, schedule, and programmatic alternatives to the baseline program are defined and evaluated.
Wilder-Naifeh Technical Skills Grant Program Report: A Baseline Evaluation
ERIC Educational Resources Information Center
Tennessee Higher Education Commission, 2010
2010-01-01
The Wilder-Naifeh Technical Skills Grant, introduced in Winter 2004, grants awards of up to $2,000 to students who attend one of the 27 Tennessee Technology Centers. Since the inception of this program, approximately 50,000 students have received grants, and the state of Tennessee has spent roughly $47.5 million on the program over the last four…
Design for effective development and prototyping of the HL-20
NASA Astrophysics Data System (ADS)
Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.
1993-10-01
A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.
NASA Technical Reports Server (NTRS)
Williams, Daniel M.; Consiglio, Maria C.; Murdoch, Jennifer L.; Adams, Catherine H.
2005-01-01
This paper provides an analysis of Flight Technical Error (FTE) from recent SATS experiments, called the Higher Volume Operations (HVO) Simulation and Flight experiments, which NASA conducted to determine pilot acceptability of the HVO concept for normal operating conditions. Reported are FTE results from simulation and flight experiment data indicating the SATS HVO concept is viable and acceptable to low-time instrument rated pilots when compared with today s system (baseline). Described is the comparative FTE analysis of lateral, vertical, and airspeed deviations from the baseline and SATS HVO experimental flight procedures. Based on FTE analysis, all evaluation subjects, low-time instrument-rated pilots, flew the HVO procedures safely and proficiently in comparison to today s system. In all cases, the results of the flight experiment validated the results of the simulation experiment and confirm the utility of the simulation platform for comparative Human in the Loop (HITL) studies of SATS HVO and Baseline operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vucelick, J.; McMichael, G.
2003-11-01
Pacific Northwest National Laboratory evaluated the fish screens at the Nursery Bridge Fishway and the newly constructed Garden City/Lowden II site west of Walla Walla, Washington, in the Walla Walla River Basin during spring and summer 2003. Both fish screen facilities were examined to determine if they were being effectively operated and maintained to provide for safe fish passage. At the Nursery Bridge Fishway, the screens were evaluated specifically to determine whether the louvers that aid in controlling water flow from behind the screens could be adjusted so that the screens would meet fish protection criteria. Data were collected tomore » determine whether velocities in front of the screens and in the bypasses met current National Oceanic and Atmospheric Administration Fisheries (NOAA Fisheries) (formerly National Marine Fisheries Service (NMFS)) criteria to promote safe and timely fish passage before and after changing the louver settings. Rock weirs downstream of the dam were also evaluated to determine whether they might impede upstream migration of juvenile salmonids during low flow conditions. At the Garden City/Lowden II site, data were collected to establish a baseline for operating conditions and to determine whether any changes in the baffle settings were needed.« less
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Application of the System and Technical Guidelines During the Siting Process III Appendix III to Part 960 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Pt. 960, App. III Appendix III to Part...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-08
..., LLC Including On-Site Leased Workers From Adecco, Argus Technical, Inc., Fox Valley Metrology URS Corp... the certification for workers of the subject firm. New information shows that workers leased from Fox... from Fox Valley Metrology, URS Corp. and CompuCom working on-site at the Oshkosh, Wisconsin location of...
EGIS - An Environmental GIS Developed for NASA Field Center Applications
NASA Technical Reports Server (NTRS)
Smoot, James; Cohan, Tyrus; O'Connor, Christina; Johnson, Gary; Carr, Hugh
2001-01-01
As the principal center for Environmental Geographic Information Systems (EGIS), the John C. Stennis Space Center (SSC), located in Hancock County, Mississippi, has been assigned technical support requirements to design and to implement a basic EGIS data base for all NASA Field Centers. The intent of this Phase I effort is to produce a baseline EGIS data base incorporating newly available remotely sensed data as well as existing environmental data. A example application of the use of the data base at Stennis Space Center will be to illustrate baseline environmental conditions for consideration with proposed propulsion test stand development and operation. To effectively answer questions related to environmental issues at each center, organization of the data layers and sources will include the following categories: Cadastral/Geodetic; Geopolitical; Hydrography; Infrastructure; Physical Geography; Socioeconomic; Remote Sensing Imagery; Associated Metadata. As part of a Phase II effort, site-specific data and applications will be implemented and added to the data base at each Field Center. This poster illustrates the framework of the design and implementation of a basic EGIS data base. Shown are example data sources, hardware and software, and data base delivery and installation. The poster also depicts future recommendations for a centrally located server to house each of the NASA Field Center data bases. The server will allow real-time data base updates with additional layers and models for each center. Expansion of the EGIS data base will continue to grow as site-specific applications are developed addressing the ongoing evolution of environmental concerns at all NASA Field Centers.
40 CFR 35.4005 - What is a Technical Assistance Grant?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Technical Assistance Grant? A Technical Assistance Grant (TAG) provides money for your group to obtain... technical advisors to help you interpret and comment on site-related information and decisions. Examples of how a technical advisor can help your group include, but are not limited to: (a) Reviewing preliminary...
40 CFR 35.4005 - What is a Technical Assistance Grant?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Technical Assistance Grant? A Technical Assistance Grant (TAG) provides money for your group to obtain... technical advisors to help you interpret and comment on site-related information and decisions. Examples of how a technical advisor can help your group include, but are not limited to: (a) Reviewing preliminary...
40 CFR 35.4005 - What is a Technical Assistance Grant?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Technical Assistance Grant? A Technical Assistance Grant (TAG) provides money for your group to obtain... technical advisors to help you interpret and comment on site-related information and decisions. Examples of how a technical advisor can help your group include, but are not limited to: (a) Reviewing preliminary...
40 CFR 35.4005 - What is a Technical Assistance Grant?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Technical Assistance Grant? A Technical Assistance Grant (TAG) provides money for your group to obtain... technical advisors to help you interpret and comment on site-related information and decisions. Examples of how a technical advisor can help your group include, but are not limited to: (a) Reviewing preliminary...
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
Brownfield to Brightfield Initiative in Oak Ridge, TN - 12346
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hough, Gil; Fairless, Chad
Experience characterizing, permitting, and restoring 'Brownfield' sites-government or industrial sites with restricted future use due to the presence or potential presence of hazardous substances, pollutants, or contaminants-is being leveraged to identify opportunities for redevelopment into solar power generating facilities which, in this context, are called 'Brightfields'. Brownfield sites offer the expansive land necessary for large photovoltaic (PV) solar farms, but require an in-depth working knowledge of complicated regulatory restrictions and environmental constraints to develop them. As a part of the effort to identify opportunities for redevelopment of Brownfield sites for solar applications, a technical guide, was composed specifically for themore » development of solar generation on restricted use sites. The basis of the technical guide gives specific consideration to environmental requirements and installation methods breaking that into three areas for assessing: 1) levels of contamination, 2) ground penetration requirements, and 3) the requirements for aesthetics and maintenance. Brightfield projects are underway to support the technical guide and expand re-industrialization efforts for the former DOE Gaseous Diffusion Plant in Oak Ridge, TN. There are exciting opportunities to turn Brownfields into Brightfield solar energy solutions for meeting the future renewable energy needs of our country. Brownfields that offer the large surface area required for solar PV farms coupled with the technical guide for the installation of solar farms on restricted use sites supports efforts to develop the solar capacities and expertise to tap this future market. The initial projects designed following the technical guide will provide verification of the installation requirements and beneficial reuse of restricted use sites. (authors)« less
Buller, David B; Young, Walter F; Bettinghaus, Erwin P; Borland, Ron; Walther, Joseph B; Helme, Donald; Andersen, Peter A; Cutter, Gary R; Maloy, Julie A
2011-01-01
A state budget shortfall defunded 10 local tobacco coalitions during a randomized trial but defunded coalitions continued to have access to 2 technical assistance Web sites. To test the ability of Web-based technology to provide technical assistance to local tobacco control coalitions. Randomized 2-group trial with local tobacco control coalitions as the unit of randomization. Local communities (ie, counties) within the State of Colorado. Leaders and members in 34 local tobacco control coalitions funded by the state health department in Colorado. Two technical assistance Web sites: A Basic Web site with text-based information and a multimedia Enhanced Web site containing learning modules, resources, and communication features. Use of the Web sites in minutes, pages, and session and evaluations of coalition functioning on coalition development, conflict resolution, leadership satisfaction, decision-making satisfaction, shared mission, personal involvement, and organization involvement in survey of leaders and members. Coalitions that were defunded but had access to the multimedia Enhanced Web site during the Fully Funded period and after defunding continued to use it (treatment group × funding status × period, F(3,714) = 3.18, P = .0234). Coalitions with access to the Basic Web site had low Web site use throughout and use by defunded coalitions was nearly zero when funding ceased. Members in defunded Basic Web site coalitions reported that their coalitions functioned worse than defunded Enhanced Web site coalitions (coalition development: group × status, F(1,360) = 4.81, P = .029; conflict resolution: group × status, F(1,306) = 5.69, P = .018; leadership satisfaction: group × status, F(1,342) = 5.69, P = .023). The Enhanced Web site may have had a protective effect on defunded coalitions. Defunded coalitions may have increased their capacity by using the Enhanced Web site when fully funded or by continuing to use the available online resources after defunding. Web-based technical assistance with online training and resources may be a good investment when future funding is not ensured.
Tanks Focus Area site needs assessment FY 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by four major US Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), and Savannah River Site (SRS). This document describes the TFA`s process of collecting site needs, analyzing them, and creating technical responses to the sites. It also summarizes the information contained within the TFA needs database, portraying information provided by four majormore » DOE sites with tank waste problems. The overall TFA program objective is to deliver a tank technology program that reduces the current cost, and the operational and safety risks of tank remediation. The TFA`s continues to enjoy close, cooperative relationships with each site. During the past year, the TFA has fostered exchanges of technical information between sites. These exchanges have proven to be healthy for all concerned. The TFA recognizes that site technology needs often change, and the TFA must be prepared not only to amend its program in response, but to help the sites arrive at the best technical approach to solve revised site needs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burton, J. C.; Environmental Research
The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at severalmore » former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling. Data from the various activities are reduced and interpreted each day by the technical staff. Various computer programs are used to visualize and integrate the data. However, people do the data interpretation and integration, not the computers, which are just one more tool at the site. At the end of the day, the staff members meet, review results, and modify the next day's program as necessary to optimize activities that are generating overlapping or confirming site details. Data are not arbitrarily discarded -- each finding must be explained and understood. Anomalous readings may be due to equipment malfunctions, laboratory error, or the inability of a technique to work in a given setting. The suite of selected technologies is adjusted in the field if necessary. (6) The end result of this process is the optimization of the field activity to produce a high-quality technical product that is cost and time effective.« less
Environmental and natural resource implications of sustainable urban infrastructure systems
NASA Astrophysics Data System (ADS)
Bergesen, Joseph D.; Suh, Sangwon; Baynes, Timothy M.; Kaviti Musango, Josephine
2017-12-01
As cities grow, their environmental and natural resource footprints also tend to grow to keep up with the increasing demand on essential urban services such as passenger transportation, commercial space, and thermal comfort. The urban infrastructure systems, or socio-technical systems providing these services are the major conduits through which natural resources are consumed and environmental impacts are generated. This paper aims to gauge the potential reductions in environmental and resources footprints through urban transformation, including the deployment of resource-efficient socio-technical systems and strategic densification. Using hybrid life cycle assessment approach combined with scenarios, we analyzed the greenhouse gas (GHG) emissions, water use, metal consumption and land use of selected socio-technical systems in 84 cities from the present to 2050. The socio-technical systems analyzed are: (1) bus rapid transit with electric buses, (2) green commercial buildings, and (3) district energy. We developed a baseline model for each city considering gross domestic product, population density, and climate conditions. Then, we overlaid three scenarios on top of the baseline model: (1) decarbonization of electricity, (2) aggressive deployment of resource-efficient socio-technical systems, and (3) strategic urban densification scenarios to each city and quantified their potentials in reducing the environmental and resource impacts of cities by 2050. The results show that, under the baseline scenario, the environmental and natural resource footprints of all 84 cities combined would increase 58%-116% by 2050. The resource-efficient scenario along with strategic densification, however, has the potential to curve down GHG emissions to 17% below the 2010 level in 2050. Such transformation can also limit the increase in all resource footprints to less than 23% relative to 2010. This analysis suggests that resource-efficient urban infrastructure and decarbonization of electricity coupled with strategic densification have a potential to mitigate resources and environmental footprints of growing cities.
TECHNICAL APPROACHES TO CHARACTERIZING AND CLEANING UP BROWNFIELDS SITES: GUIDANCE DOCUMENT
NRMRL-CIN-1741 SAIC. Technical Approaches to Characterizing and Cleaning up Brownfields Sites. EPA/625/R/00/009 (NTIS PB2002-105021) , Available: 68-C7-0011. The guidance document gives assistance to communities, decision-makers, states and municipalities, academia, and the p...
Technical Assistance Plan (TAP)
A Technical Assistance Plan (TAP) enables community groups to retain the services of an independent technical advisor and to provide resources for a community group to help inform other community members about site decisions.
Global geodesy using GPS without fiducial sites
NASA Technical Reports Server (NTRS)
Heflin, Michael; Bertiger, Willy; Blewitt, Geoff; Freedman, Adam; Hurst, Ken; Lichten, Steve; Lindqwister, Ulf; Vigue, Yvonne; Webb, Frank; Yunck, Tom
1992-01-01
Baseline lengths and geocentric radii have been determined from GPS data without the use of fiducial sites. Data from the first GPS experiment for the IERS and Geodynamics (GIG '91) have been analyzed with a no-fiducial strategy. A baseline length daily repeatability of 2 mm + 4 parts per billion was obtained for baselines in the Northern Hemisphere. Comparison of baseline lengths from GPS and the global VLBI solution GLB659 (Caprette et al. 1990) show rms agreement of 2.1 parts per billion. The geocentric radius mean daily repeatability for all sites was 15 cm. Comparison of geocentric radii from GPS and SV5 (Murray et al. 1990) show rms agreement of 3.8 cm. Given n globally distributed stations, the n(n - 1)/2 baseline lengths and n geocentric radii uniquely define a rigid closed polyhedron with a well-defined center of mass. Geodetic information can be obtained by examining the structure of the polyhedron and its change with time.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Duncan, Garth M.; Saunders, Scott A.
2013-07-01
The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two differentmore » prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)« less
Tribal Energy Program for California Indian Tribes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Singer, S.
A strategic plan is needed to catalyze clean energy in the more than 100 California Indian tribal communities with varying needs and energy resources. We propose to conduct a scoping study to identify tribal lands with clean energy potential, as well as communities with lack of grid-tied energy and communications access. The research focus would evaluate the energy mixture and alternatives available to these tribal communities, and evaluate greenhouse gas emissions associated with accessing fossil fuel used for heat and power. Understanding the baseline of energy consumption and emissions of communities is needed to evaluate improvements and advances from technology.more » Based on this study, we will develop a strategic plan that assesses solutions to address high energy fuel costs due to lack of electricity access and inform actions to improve economic opportunities for tribes. This could include technical support for tribes to access clean energy technologies and supporting collaboration for on-site demonstrations.« less
Comparison of VLBI, TV and traveling clock techniques for time transfer
NASA Technical Reports Server (NTRS)
Spencer, J. H.; Waltman, E. B.; Johnston, K. J.; Santini, N. J.; Klepczynski, W. J.; Matsakis, D. N.; Angerhofer, P. E.; Kaplan, G. M.
1982-01-01
A three part experiment was conducted to develop and compare time transfer techniques. The experiment consisted of (1) a very long baseline interferometer (VLBI), (2) a high precision portable clock time transfer system between the two sites, and (3) a television time transfer. A comparison of the VLBI and traveling clock shows each technique can perform satisfactorily at the five nsec level. There was a systematic offset of 59 nsec between the two methods, which we attributed to a difference in epochs between VLBI formatter and station clock. The VLBI method had an internal random error of one nsec at the three sigma level for a two day period. Thus, the Mark II system performed well, and VLBI shows promise of being an accurate method of time transfer. The TV system, which had technical problems during the experiment, transferred time with a random error of about 50 nsec.
NASA Astrophysics Data System (ADS)
Wigder, N. L.; Jaffe, D. A.; Lin, M.; Fiore, A. M.; Macdonald, A.; Gong, S.
2011-12-01
Baseline ozone (O3) has been defined as the distribution of mixing ratios from a site when it is not influenced by locally emitted pollution (McDonald-Buller et al., 2011; NRC, 2009; TF HTAP, 2007). In this study, we set out to understand the interannual variation (IAV) in baseline O3 along the western coast of North America and its influence on surface air quality in urban environments. Baseline data for this study comes from Trinidad Head, CA, Mount Bachelor, OR, Cheeka Peak, WA, Jackson Visitor Center, WA and Whistler Mountain, BC. We address four key questions:
Disposal Site Selection. Technical Appendix - Phase 1 (Central Puget Sound). Volume 3
1988-06-01
Department of Natural lesources Kevin Anderson, State of Washington Department of Ecology Carl Kassebaum, U.S. Evironmental Protection Agency Prepared for...Physical Fate at Open Waer Sites. Technical Report D-78-47, U.S. Army &nineer Waterways 2Xperltent Station. Vicksburg, Mississippi. Johnson, B.H., and
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
10 CFR 52.17 - Contents of applications; technical information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... NUCLEAR POWER PLANTS Early Site Permits § 52.17 Contents of applications; technical information. (a) For..., and thermal power level of the facilities, or range of possible facilities, for which the site may be... forth the requirements for quality assurance programs for nuclear power plants. The description of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... Resources, Systems Pros, Total Tech Services, Triple Crown Consulting, and Ingenium Technology, Inc... Resources, PDS Technical Service, Superior Technical Resources, Systems Pros, Total Tech Services, and... subject firm. The company reports that workers leased from Ingenium Technology, Inc. were employed on-site...
This document describes parts of the technical analysis being undertaken in support of standards that ensure certain sites are cleaned up to a level that is protective of human health and the environment before they are released for public use.
Integrative Cardiac Health Project, Windber Research Institute
2014-07-01
laparoscopically placed adjustable gastric banding (LAGB) baseline (5) and one year (5), control baseline (5) and one year (5). OD260/280 ratios...coverage and detection of 3-4 million CpG sites . All samples had a bisulfite conversion rate of >98.25%; number of CpG (methylated) sites per sample...methylation) and hyper-methylated (increasing methylation) sites in the three groups were identified. For LAGB patients, a heat map based on
10 CFR 960.5-2 - Technical guidelines.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REPOSITORY Preclosure Guidelines § 960.5-2 Technical guidelines. The technical guidelines in this subpart set... repository and to the transportation of waste to a repository site. The third group includes conditions on...
, NREL Technical Report (2017) Energy Assessment Toolkits, NREL Technical Report (2017) Solid-State Lighting Replacement and Maintenance of Lighting Design Goals, NREL Technical Report (2017) Nevada National Security Site 23 Solar and Storage Assessment, NREL Technical Report (2016) Tiller Ranger Station Net Zero
Tropospheric delay ray tracing applied in VLBI analysis
NASA Astrophysics Data System (ADS)
Eriksson, David; MacMillan, D. S.; Gipson, John M.
2014-12-01
Tropospheric delay modeling error continues to be one of the largest sources of error in VLBI (very long baseline interferometry) analysis. For standard operational solutions, we use the VMF1 elevation-dependent mapping functions derived from European Centre for Medium-Range Weather Forecasts data. These mapping functions assume that tropospheric delay at a site is azimuthally symmetric. As this assumption is not true, we have instead determined the ray trace delay along the signal path through the troposphere for each VLBI quasar observation. We determined the troposphere refractivity fields from the pressure, temperature, specific humidity, and geopotential height fields of the NASA Goddard Space Flight Center Goddard Earth Observing System version 5 numerical weather model. When applied in VLBI analysis, baseline length repeatabilities were improved compared with using the VMF1 mapping function model for 72% of the baselines and site vertical repeatabilities were better for 11 of 13 sites during the 2 week CONT11 observing period in September 2011. When applied to a larger data set (2011-2013), we see a similar improvement in baseline length and also in site position repeatabilities for about two thirds of the stations in each of the site topocentric components.
ERIC Educational Resources Information Center
General Electric Co., Philadelphia, PA. Space Div.
The purpose of this study was to establish the technical and economic feasibility of using solar energy for the heating and cooling of buildings and to provide baseline information for the widespread application of solar energy. The initial step in this program was a study of the technical, economic, societal, legal, and environmental factors…
Technical Assessment of Maglev System Concepts
1998-10-01
pressurizes the loop but retains sufficient heat capacity for the day’s cooling needs. Magneplane uses a cryorefrigerator to keep its supercritical helium in...comparative baselines. the technical and economic viability of maglev in * Apply this process to alternative U.S. maglev the U.S. and to recommend...output/joules- heat the same data as in Figure 119 with the aforemen- input). In effect, applying this factor implies that tioned efficiencies applied
NASA Technical Reports Server (NTRS)
1972-01-01
The work performed to arrive at a baseline astronomy sortie mission concept is summarized. The material includes: (1) definition of the telescopes and arrays; (2) preliminary definition of mission and systems; (3) identification, definition, and evaluation of alternative sortie programs; (4) the recommended astronomy sortie program; and (5) the astronomy sortie program concept that was approved as a baseline for the remainder of the project.
40 CFR 35.4005 - What is a Technical Assistance Grant?
Code of Federal Regulations, 2010 CFR
2010-07-01
... public participation in decision making at eligible sites. A TAG allows your group to procure independent... Technical Assistance Grant? A Technical Assistance Grant (TAG) provides money for your group to obtain... how a technical advisor can help your group include, but are not limited to: (a) Reviewing preliminary...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
...-Chrysler Technical Training Center, Technology Training Joint Programs Staff, Including On-Site Leased Workers From Cranks, O/E Learning, DBSI, IDEA, and Tonic/MVP, Detroit, MI; UAW-Chrysler Technical Training... workers and former workers of UAW-Chrysler Technical Training Center, Technology Training Joint Programs...
An Input Evaluation of Three Technical Assistance Needs Assessment Strategies.
ERIC Educational Resources Information Center
Suarez, Tanya M.; Cox, James O.
The Technical Assistance Development System--TADS (a project to provide technical assistance to personnel implementing programs for preschool handicapped children and their families) conducted an evaluation of three technical assistance needs assessment strategies during 1979-80. The three strategies were: (1) on-site--conducted by a trained needs…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keller, David Charles
In 2014, baseline storm water monitoring samples for Potrillo Canyon Sample Management Area at Los Alamos National Laboratory (LANL) exceeded the National Pollutant Discharge Elimination System Individual Permit No. NM0030759 target action level (TAL) of 15 picocuries per liter (pCi/L) for gross-alpha radioactivity (393 pCi/L) and a TAL of 30 pCi/L for radium-226 and radium-228 (95.9 pCi/L). Consequently, erosion control measures within the management area are proposed to minimize sediment migration, a corrective action under the permit that is a requirement of the New Mexico Environment Department consent decree and a good management practice to limit off-site sediment migration. Themore » area proposed for erosion controls consists of portions of Technical Area 36 that were used as firing sites primarily involving high explosives (HE) and metal (e.g., depleted uranium, lead, copper, aluminum, and steel), small-explosives experiments and burn pits (burn pits were used for burning and disposal of test debris). In addition, underground explosive tests at an approximate depth of 100 feet were also conducted. These watershed-based storm water controls will focus on addressing erosion occurring within the floodplain through mitigating and reducing both current and future channelization and head cutting.« less
Potential for cogeneration of heat and electricity in California industry, phase 1
NASA Technical Reports Server (NTRS)
Davis, H. S.; Gurfield, R. M.; Moretti, V. C.; Slonski, M. L.
1978-01-01
Information collected during an industrial survey of 12 selected plants was organized into four categories: technical, economic, environmental, and institutional. The technical aspects of industrial cogeneration are examined on a site-specific basis. The site-specific economics, environmental constraints, and institutional barriers that impact industrial cogeneration will be further investigated.
The Evidence Base for Gypsy and Traveller Site Planning: A Story of Complexity and Tension
ERIC Educational Resources Information Center
Niner, Pat; Brown, Philip
2011-01-01
The linear technical-rational model has been heavily criticised as theoretically, politically and practically inadequate. The example of accommodation needs assessment as evidence for highly contentious decisions on Gypsy and Traveller caravan site provision suggests, however, that the technical-rational model has great value in coping with…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
... and General Physics Corporation Excluding Workers of the Global Purchasing and Supply Chain Division... plants. The company reports that workers leased from General Physics Corporation were employed on-site at..., Technical Center. The Department has determined that on-site workers from General Physics Corporation were...
A Friend in Your Neighborhood: Local Risk Communication in a Technical Writing Classroom
ERIC Educational Resources Information Center
Rhodes, Lynne
2009-01-01
When examined rhetorically, Savannah River Site Community Preparedness Information calendars from 1994, 2004, and 2008 represent living rhetorical practices aimed at changing the public mind. My technical communication classroom at USC Aiken is uniquely situated for us to examine documents constantly generated by the site's Public Affairs…
Jagadish Pai, B. S.; Rajan, Smitha Anitha; Srinivas, M.; Padma, R.; Suragimath, Girish; Walvekar, Amit; Goel, Saakshi; Kamath, Vinesh
2013-01-01
Background: The purpose of this study was to clinically evaluate the benefits of sub gingival chlorhexidine (CHX) varnish and biodegradable CHX chip application used as an adjunct to scaling and root planning (SRP) as combined therapy and also to compare the effect of combined therapy with SRP alone. Materials and Methods: Fifteen patients with at least three sites with a probing pocket depth (PPD) of 5-8 mm were considered. Following baseline evaluation, all three sites were subjected for SRP. After completing SRP, each site was randomly subjected for CHX varnish, CHX chip application and the 3rd site was left without any medication as a control. Clinical parameters such as sulcus bleeding index, plaque index, bleeding on probing (BOP), PPD, and clinical attachment level (CAL) were recorded at baseline, 1 month and 3 months post-operatively. Results: All three groups presented with an improvement in clinical parameters compared to baseline. The mean reduction in PPD was 2.4 mm in SRP sites, 2.5 mm in SRP + CHX varnish sites and 2.8 mm in SRP + CHX chip sites. The mean gain in CAL was 2.4 mm in SRP sites, 2.3 mm in SRP + CHX varnish sites and 2.8 mm SRP + CHX chip sites. Interpretation and Conclusion: The present study indicated that application of CHX varnish and placement of CHX chip as an adjunct to SRP produced a clinically significant reduction in the PPD, BOP and a gain in CAL at 30th day and 90th day from baseline when compared to SRP alone. The results though were not statistically significant. PMID:24015002
Louridas, Marisa; Quinn, Lauren E; Grantcharov, Teodor P
2016-03-01
Emerging evidence suggests that despite dedicated practice, not all surgical trainees have the ability to reach technical competency in minimally invasive techniques. While selecting residents that have the ability to reach technical competence is important, evidence to guide the incorporation of technical ability into selection processes is limited. Therefore, the purpose of the present study was to evaluate whether background experiences and 2D-3D visual spatial test results are predictive of baseline laparoscopic skill for the novice surgical trainee. First-year residents were studied. Demographic data and background surgical and non-surgical experiences were obtained using a questionnaire. Visual spatial ability was evaluated using the PicSOr, cube comparison (CC) and card rotation (CR) tests. Technical skill was assessed using the camera navigation (LCN) task and laparoscopic circle cut (LCC) task. Resident performance on these technical tasks was compared and correlated with the questionnaire and visual spatial findings. Previous experience in observing laparoscopic procedures was associated with significantly better LCN performance, and experience in navigating the laparoscopic camera was associated with significantly better LCC task results. Residents who scored higher on the CC test demonstrated a more accurate LCN path length score (r s(PL) = -0.36, p = 0.03) and angle path (r s(AP) = -0.426, p = 0.01) score when completing the LCN task. No other significant correlations were found between the visual spatial tests (PicSOr, CC or CR) and LCC performance. While identifying selection tests for incoming surgical trainees that predict technical skill performance is appealing, the surrogate markers evaluated correlate with specific metrics of surgical performance related to a single task but do not appear to reliably predict technical performance of different laparoscopic tasks. Predicting the acquisition of technical skills will require the development of a series of evidence-based tests that measure a number of innate abilities as well as their inherent interactions.
Integrated Baseline Review (IBR) Handbook
NASA Technical Reports Server (NTRS)
2013-01-01
An Integrated Baseline Review (IBR) is a review of a supplier?s Performance Measurement Baseline (PMB). It is conducted by Program/Project Managers and their technical staffs on contracts and in-house work requiring compliance with NASA Earned Value Management System (EVMS) policy as defined in program/project policy, NPR 7120.5, or in NASA Federal Acquisition Regulations. The IBR Handbook may also be of use to those responsible for preparing the Terms of Reference for internal project reviews. While risks may be identified and actions tracked as a result of the IBR, it is important to note that an IBR cannot be failed.
Kathamuthu, Gokul Raj; Moideen, Kadar; Baskaran, Dhanaraj; Banurekha, Vaithilingam V; Nair, Dina; Sekar, Gomathi; Sridhar, Rathinam; Vidyajayanthi, Bharathi; Gajendraraj, Ganeshan; Parandhaman, Dinesh Kumar; Srinivasan, Alena; Babu, Subash
2017-05-01
Tuberculous lymphadenitis (TBL) is characterized by an expansion of Th1 and Th17 cells with altered serum levels of proinflammatory cytokines. However, the cytokine profile at the site of infection, i.e., the affected lymph nodes, has not been examined in detail. To estimate the baseline and mycobacterial antigen-stimulated concentrations of type 1, type 17, and other proinflammatory cytokines in patients with TBL ( n = 14), we examined both the baseline and the antigen-specific concentrations of these cytokines before and after chemotherapy and compared them with those in individuals with pulmonary tuberculosis (PTB) ( n = 14). In addition, we also compared the cytokine responses in whole blood and those in the lymph nodes of TBL individuals. We observed significantly enhanced baseline and antigen-specific levels of type 1 cytokines (gamma interferon [IFN-γ] and tumor necrosis factor alpha [TNF-α]) and a type 17 cytokine (interleukin-17 [IL-17]) and significantly diminished baseline and antigen-specific levels of proinflammatory cytokines (IL-1β and IL-18) in the whole blood of TBL individuals compared to those in the whole blood of PTB individuals. Moreover, we also observed a pattern of baseline and antigen-specific cytokine production at the site of infection (lymph node) similar to that in the whole blood of TBL individuals. Following standard antituberculosis (anti-TB) treatment, we observed alterations in the baseline and/or antigen-specific levels of IFN-γ, TNF-α, IL-1β, and IL-18. TBL is therefore characterized by enhanced baseline and antigen-specific production of type 1 and type 17 cytokines and reduced baseline and antigen-specific production of IL-1β and IL-18 at the site of infection. Copyright © 2017 American Society for Microbiology.
Ground Water Technical Considerations during the Five-Year Review Process
This issue paper has been developed to highlight technical considerations as well as technical resources available to Remedial Project Managers (RPMs) in conducting Five-Year Reviews (FYRs) at CERCLA1 sites with contaminated groundwater.
Civilian Radioactive Waste Management System Requirements Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
C.A. Kouts
2006-05-10
The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible formore » design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further defining system element functions, decomposing requirements into significantly greater detail, and developing designs of system components, facilities, and equipment. The CRD addresses the identification and control of functional, physical, and operational boundaries between and within CRWMS elements. The CRD establishes requirements regarding key interfaces between the CRWMS and elements external to the CRWMS. Project elements define interfaces between CRWMS program elements. The Program has developed a change management process consistent with DOE Order 413.3-Change 1. Changes to the Secretarial Acquisition Executive and Program-level baselines must be approved by a Program Baseline Change Control Board. Specific thresholds have been established for identifying technical, cost, and schedule changes that require approval. The CRWMS continually evaluates system design and operational concepts to optimize performance and/or cost. The Program has developed systems analysis tools to assess potential enhancements to the physical system and to determine the impacts from cost saving initiatives, scientific and technological improvements, and engineering developments. The results of systems analyses, if appropriate, are factored into revisions to the CRD as revised Programmatic Requirements.« less
Determine Baseline Energy Consumption | Climate Neutral Research Campuses |
the campus boundary and any off-site energy impacts you will be calculating. For example, the fuel usually included in the baseline. However, the impacts of joint ventures that take place off-site are Web page. Scope 3: Transportation impacts from commuters and business travel, which can be derived
Popejoy, Traci; Randklev, Charles R; Neeson, Thomas M; Vaughn, Caryn C
2018-05-08
The shifting baseline syndrome concept advocates for the use of historical knowledge to inform conservation baselines, but does not address the feasibility of restoring sites to those baselines. In many regions, conservation feasibility varies among sites due to differences in resource availability, statutory power, and land-owner participation. We use zooarchaeological records to identify a historical baseline of the freshwater mussel community's composition before Euro-American influence at a river-reach scale. We evaluate how the community reference position and the feasibility of conservation might enable identification of sites where conservation actions would preserve historically representative communities and be likely to succeed. We first present a conceptual model that incorporates community information and landscape factors to link the best conservation areas to potential cost and conservation benefits. Using fuzzy ordination, we identify modern mussel beds that are most like the historical baseline. We then quantify the housing density and land use near each reach to estimate feasibility of habitat restoration. Using our conceptual framework, we identify reaches that have high conservation value (i.e., reaches that contain the best mussel beds) and where restoration actions would be most likely to succeed. Reaches above Lake Belton in central Texas, U.S.A. were most similar in species composition and relative abundance to zooarchaeological sites. A subset of these mussel beds occurred in locations where conservation actions appear to be most feasible. This study demonstrates how to use zooarchaeological data (biodiversity data often readily available) and estimates of conservation feasibility to inform conservation priorities at a local spatial scale. This article is protected by copyright. All rights reserved.
Evaluation of the Florida coordinated school health program pilot schools project.
Weiler, Robert M; Pigg, R Morgan; McDermott, Robert J
2003-01-01
The Florida Department of Education, with CDC funding, designed the Florida Coordinated School Health Program Pilot Schools Project (PSP) to encourage innovative approaches to promote coordinated school health programs (CSHP) in Florida schools. Each of eight pilot schools received $15,000 in project funding, three years of technical assistance including on-site and off-site assistance, a project office resource center, mailings of resource materials, needs assessment and evaluation assistance, and three PSP Summer Institutes. Project evaluators created a context evaluation, approaching each school independently as a "case study" to measure the school's progress in meeting goals established at baseline. Data were collected using the How Healthy is Your School? needs assessment instrument, a School Health Portfolio constructed by each school team, a Pilot Schools Project Team Member Survey instrument, midcourse team interviews, final team interviews, and performance indicator data obtained from pilot and control schools. The PSP posed two fundamental questions: "Can financial resources, professional training, and technical assistance enable individual schools to create and sustain a coordinated school health program?" and "What outcomes reasonably can one expect from a coordinated school health program, assuming programs receive adequate support over time?" First, activities at the eight schools confirmed that a coordinated school health programs can be established and sustained. Program strength and sustainability depend on long-term resources, qualified personnel, and administrative support. Second, though coordinated school health programs may improve school performance indicators, the PSP yielded insufficient evidence to support that belief. Future projects should include robust measurement and evaluation designs, thereby producing conclusive evidence about the influence of a coordinated school health program on such outcomes.
Ajam, Amna A; Nguyen, Xuan V; Kelly, Ronda A; Ladapo, Joseph A; Lang, Elvira V
2017-07-01
The aim of this study was to assess the effects of team training on operational efficiency during outpatient MRI. In this institutional review board-approved, HIPAA-compliant study, six MRI outpatient sites of a midwestern hospital system were randomized to serve as controls or have their teams trained in advanced communication skills. The fourth quarter of fiscal year 2015 was the trial baseline. The trial ended in the third quarter (Q3) of fiscal year 2016 (FY16). Equipment utilization (completed scans/available slots), hourly scan rates (total orders completed per machine per hour of operation), and no-show rates stratified by time were analyzed using the Cochran-Mantel-Haenszel method, with individual comparisons performed with Bonferroni correction. The study encompassed 27,425 MRI examinations. Overall volume peaked at baseline and then declined over the following quarters. Compared with baseline, untrained sites experienced significant drops in equipment utilization (P < .01 for the first quarter of FY16 and P < .0001 for the second quarter of FY16 and Q3 FY16), decreasing from 77% to 65% over the study period, corresponding to a decrease from 1.15 to 0.97 in hourly scan rates. For trained sites, these metrics showed no significant change, with maintenance of hourly scan rates of 1.23 and 1.27 and equipment utilization rates of 83% and 85% between baseline and Q3 FY16. No-show rates remained stable at trained sites but increased at untrained sites in the last two quarters (P < .05). Nationally benchmarked patient satisfaction percentile ranking gradually increased at trained sites from 56th at baseline to 70th and successively decreased at untrained sites from 66th to 44th. MRI outpatient facilities trained in advanced communication techniques may have more favorable operational efficiency than untrained sites in a saturated market. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.
Factors that influence the non-technical skills performance of scrub nurses: a prospective study.
Kang, Evelyn; Massey, Debbie; Gillespie, Brigid M
2015-12-01
To identify and describe the factors that impact on the performance of scrub nurses' non-technical skills performance during the intra-operative phase of surgery. Non-technical skills have been identified as important precursors to errors in the operating room. However, few studies have investigated factors influencing non-technical skills of scrub nurses. Prospective observational study. Structured observations were performed on a sample of 182 surgical procedures across eight specialities by two trained observers from August 2012-April 2013 at two hospital sites. Participants were purposively selected scrub nurses. Bivariate correlations and a multiple linear regression model were used to identify associations among length of surgery, patients' acuity using the American Society of Anesthesiologists classification system, team familiarity, number of occasions scout nurses leave the operating room, change of scout nurse and the outcome, the non-technical skills performance of scrub nurses. Patient acuity and team familiarity were the strongest predictors of scrub nurses' non-technical skills performance at hospital site A. There were no correlations between the predictors and the performance of scrub nurses at hospital site B. A dedicated surgical team and patient acuity potentially influence the performance of scrub nurses' non-technical skills. Familiarity with team members foster advanced planning, thus minimizing distractions and interruptions that impact on scrub nurses' performance. Development of interventions aimed at improving non-technical skills has the potential to make a substantial difference and enhance patient care. © 2015 John Wiley & Sons Ltd.
Comparative isotope ecology of African great apes.
Oelze, Vicky M; Fahy, Geraldine; Hohmann, Gottfried; Robbins, Martha M; Leinert, Vera; Lee, Kevin; Eshuis, Henk; Seiler, Nicole; Wessling, Erin G; Head, Josephine; Boesch, Christophe; Kühl, Hjalmar S
2016-12-01
The isotope ecology of great apes is a useful reference for palaeodietary reconstructions in fossil hominins. As extant apes live in C 3 -dominated habitats, variation in isotope signatures is assumed to be low compared to hominoids exploiting C 4 -plant resources. However, isotopic differences between sites and between and within individuals are poorly understood due to the lack of vegetation baseline data. In this comparative study, we included all species of free-ranging African great apes (Pan troglodytes, Pan paniscus, Gorilla sp.). First, we explore differences in isotope baselines across different habitats and whether isotopic signatures in apes can be related to feeding niches (faunivory and folivory). Secondly, we illustrate how stable isotopic variations within African ape populations compare to other extant and extinct primates and discuss possible implications for dietary flexibility. Using 701 carbon and nitrogen isotope data points resulting from 148 sectioned hair samples and an additional collection of 189 fruit samples, we compare six different great ape sites. We investigate the relationship between vegetation baselines and climatic variables, and subsequently correct great ape isotope data to a standardized plant baseline from the respective sites. We obtained temporal isotopic profiles of individual animals by sectioning hair along its growth trajectory. Isotopic signatures of great apes differed between sites, mainly as vegetation isotope baselines were correlated with site-specific climatic conditions. We show that controlling for plant isotopic characteristics at a given site is essential for faunal data interpretation. While accounting for plant baseline effects, we found distinct isotopic profiles for each great ape population. Based on evidence from habituated groups and sympatric great ape species, these differences could possibly be related to faunivory and folivory. Dietary flexibility in apes varied, but temporal variation was overall lower than in fossil hominins and extant baboons, shifting from C 3 to C 4 -resources, providing new perspectives on comparisons between extinct and extant primates. Copyright © 2016 Elsevier Ltd. All rights reserved.
Technical Support for Contaminated Sites
In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled...
Our Theme for 2016: Sustaining Momentum
2016-03-01
of design architectures and interfaces to make both open sys- tems and modularity a reality. This is “owning the technical baseline,” and the devil... write this year, although we will be implementing the changes required in the Fiscal Year (FY) 2016 National Defense Au- thorization Act. We still...Defense for Acquisition, Technology, and Logistics on the momentum we have gained as we get ready for a new administration next year. Promote Technical
Allain, Larry; Vidrine, Malcolm
2014-01-01
This project provides baseline data of butterfly populations at two coastal prairie restoration sites in Louisiana, the Duralde Unit of Lacassine National Wildlife Refuge (hereafter, the Duralde site) and the Cajun Prairie Restoration Project in Eunice (hereafter, the Eunice site). In all, four distinct habitat types representing different planting methods were sampled. These data will be used to assess biodiversity and health of native grasslands and also provide a basis for adaptive management.
The report discusses technical and non-technical considerations associated with the development and operation of landfill gas to energy projects. Much of the report is based on interviews and site visits with the major developers and operators of the more than 110 projects in the...
78 FR 23556 - Supplemental Notice of Technical Conference
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
...] Supplemental Notice of Technical Conference Docket Nos. Filing via the Internet RM07-16-000 Electronic Tariff... hold a technical conference on April 16, 2013 from 10:00 a.m. to 1:00 p.m. (EST) to demonstrate changes... there have been changes affecting the off-site broadcast of the technical conference. \\1\\ Notice of...
Investigation of possibilities for solar-powered high-energy lasers in space
NASA Technical Reports Server (NTRS)
1982-01-01
Solar pumped lasers were investigated. The literature was reviewed for possible solar laser candidates from optical pumping experiments. A baseline CO electric discharge laser system was shown to be technically feasible. The most promising direct solar pumped laser was identified to be CF3I. Using the 'STAG' solar laser concept and CF3I, it was found that such a system could be weight competitive with the baseline CO laser system.
An MBSE Approach to Space Suit Development
NASA Technical Reports Server (NTRS)
Cordova, Lauren; Kovich, Christine; Sargusingh, Miriam
2012-01-01
The EVA/Space Suit Development Office (ESSD) Systems Engineering and Integration (SE&I) team has utilized MBSE in multiple programs. After developing operational and architectural models, the MBSE framework was expanded to link the requirements space to the system models through functional analysis and interfaces definitions. By documenting all the connections within the technical baseline, ESSD experienced significant efficiency improvements in analysis and identification of change impacts. One of the biggest challenges presented to the MBSE structure was a program transition and restructuring effort, which was completed successfully in 4 months culminating in the approval of a new EVA Technical Baseline. During this time three requirements sets spanning multiple DRMs were streamlined into one NASA-owned Systems Requirement Document (SRD) that successfully identified requirements relevant to the current hardware development effort while remaining extensible to support future hardware developments. A capability-based hierarchy was established to provide a more flexible framework for future space suit development that can support multiple programs with minimal rework of basic EVA/Space Suit requirements. This MBSE approach was most recently applied for generation of an EMU Demonstrator technical baseline being developed for an ISS DTO. The relatively quick turnaround of operational concepts, architecture definition, and requirements for this new suit development has allowed us to test and evolve the MBSE process and framework in an extremely different setting while still offering extensibility and traceability throughout ESSD projects. The ESSD MBSE framework continues to be evolved in order to support integration of all products associated with the SE&I engine.
Leff, Daniel R; Aggarwal, Rajesh; Rana, Mariam; Nakhjavani, Batool; Purkayastha, Sanjay; Khullar, Vik; Darzi, Ara W
2008-03-01
Research evaluating fatigue-induced skills decline has focused on acute sleep deprivation rather than the effects of circadian desynchronization associated with multiple shifts. As a result, the number of consecutive night shifts that residents can safely be on duty without detrimental effects to their technical skills remains unknown. A prospective observational cohort study was conducted to assess the impact of 7 successive night shifts on the technical surgical performance of junior residents. The interventional strategy included training 21 residents from surgery and allied disciplines on a virtual reality surgical simulator, towards the achievement of preset benchmark scores, followed by 294 technical skills assessments conducted over 1764 manpower night shift hours. Primary outcomes comprised serial technical skills assessments on 2 tasks of a virtual reality surgical simulator. Secondary outcomes included assessments of introspective fatigue, duration of sleep, and prospective recordings of activity (number of "calls" received, steps walked, and patients evaluated). Maximal deterioration in performance was observed following the first night shift. Residents took significantly longer to complete the first (P = 0.002) and second tasks (P = 0.005) compared with baseline. They also committed significantly greater numbers of errors (P = 0.025) on the first task assessed. Improved performance was observed across subsequent shifts towards baseline levels. Newly acquired technical surgical skills deteriorate maximally after the first night shift, emphasizing the importance of adequate preparation for night rotas. Performance improvements across successive shifts may be due to ongoing learning or adaptation to chronic fatigue. Further research should focus on assessments of both technical procedural skills and cognitive abilities to determine the rotas that best minimize errors and maximize patient safety.
Helfrich, Christian D; Kohn, Marlana J; Stapleton, Austin; Allen, Claire L; Hammerback, Kristen Elizabeth; Chan, K C Gary; Parrish, Amanda T; Ryan, Daron E; Weiner, Bryan J; Harris, Jeffrey R; Hannon, Peggy A
2018-01-01
Organizational readiness to change may be a key determinant of implementation success and a mediator of the effectiveness of implementation interventions. If organizational readiness can be reliably and validly assessed at the outset of a change initiative, it could be used to assess the effectiveness of implementation-support activities by measuring changes in readiness factors over time. We analyzed two waves of readiness-to-change survey data collected as part of a three-arm, randomized controlled trial to implement evidence-based health promotion practices in small worksites in low-wage industries. We measured five readiness factors: context (favorable broader conditions); change valence (valuing health promotion); information assessment (demands and resources to implement health promotion); change commitment (an intention to implement health promotion); and change efficacy (a belief in shared ability to implement health promotion). We expected commitment and efficacy to increase at intervention sites along with their self-reported effort to implement health promotion practices, termed wellness-program effort. We compared means between baseline and 15 months, and between intervention and control sites. We used linear regression to test whether intervention and control sites differed in their change-readiness scores over time. Only context and change commitment met reliability thresholds. Change commitment declined significantly for both control (-0.39) and interventions sites (-0.29) from baseline to 15 months, while context did not change for either. Only wellness program effort at 15 months, but not at baseline, differed significantly between control and intervention sites (1.20 controls, 2.02 intervention). Regression analyses resulted in two significant differences between intervention and control sites in changes from baseline to 15 months: (1) intervention sites exhibited significantly smaller change in context scores relative to control sites over time and (2) intervention sites exhibited significantly higher changes in wellness program effort relative to control sites. Contrary to our hypothesis, change commitment declined significantly at both Healthlinks and control sites, even as wellness-program effort increased significantly at HealthLinks sites. Regression to the mean may explain the decline in change commitment. Future research needs to assess whether baseline commitment is an independent predictor of wellness-program effort or an effect modifier of the HealthLinks intervention.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deju, R.A.
1982-10-01
The Basalt Waste Isolation Project's mission is to assess whether or not a nuclear waste repository can be sited in the basalts beneath the Hanford Site. Dr. Deju summarizes the results of the siting studies, the activities connected with waste package development, and ongoing engineering studies. In addition, he gives a glimpse of past technical reviews of the project and comments on major technical activities planned in the near future.
NASA Technical Reports Server (NTRS)
Stolz, A.; Larden, D. R.
1980-01-01
The seasonal deformation normal to the Earth's surface was calculated at stations involved or interested in very long baseline interferometry (VLBI) geodesy and at hypothetical sites in Australia and Brazil using global atmospheric pressure data, values for groundwater storage, and load Love numbers deduced from current Earth models. It was found that the annual range of deformation approached the centimeter level measuring potential of the VLBI technqiue at Greenbank, Haystack, and the Brazil site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giaddui, T; Chen, W; Yu, J
2014-06-15
Purpose: To review IGRT credentialing experience and unexpected technical issues encountered in connection with advanced radiotherapy technologies as implemented in RTOG clinical trials. To update IGRT credentialing procedures with the aim of improving the quality of the process, and to increase the proportion of IGRT credentialing compliance. To develop a living disease site-specific IGRT encyclopedia. Methods: Numerous technical issues were encountered during the IGRT credentialing process. The criteria used for credentialing review were based on: image quality; anatomy included in fused data sets and shift results. Credentialing requirements have been updated according to the AAPM task group reports for IGRTmore » to ensure that all required technical items are included in the quality review process. Implementation instructions have been updated and expanded for recent protocols. Results: Technical issues observed during the credentialing review process include, but are not limited to: poor quality images; inadequate image acquisition region; poor data quality; shifts larger than acceptable; no soft tissue surrogate. The updated IGRT credentialing process will address these issues and will also include the technical items required from AAPM: TG 104; TG 142 and TG 179 reports. An instruction manual has been developed describing a remote credentialing method for reviewers. Submission requirements are updated, including images/documents as well as facility questionnaire. The review report now includes summary of the review process and the parameters that reviewers check. We have reached consensus on the minimum IGRT technical requirement for a number of disease sites. RTOG 1311(NRG-BR002A Phase 1 Study of Stereotactic Body Radiotherapy (SBRT) for the Treatment of Multiple Metastases) is an example, here; the protocol specified the minimum requirement for each anatomical sites (with/without fiducials). Conclusion: Technical issues are identified and reported. IGRT guidelines are updated, with the corresponding credentialing requirements. An IGRT encyclopedia describing site-specific implementation issues is currently in development.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... providing information or technical assistance? 86.302 Section 86.302 Education Office of the Secretary... information or technical assistance? (a) The Secretary provides information or technical assistance to an IHE in writing, through site visits, or by other means. (b) The IHE shall inform the Secretary of any...
EPA Technical Support Centers (TSC): FY14 Lessons ...
EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this information to users in both direct applications (i.e., site-specific technical support) and general applications (i.e., technical transfer activities such as technical guidance documents, conferences, or workshops) . The TSCs are charged with providing solutions by: 1) linking EPA research to Agency decision-makers; 2) applying best practices to real world field applications; and 3) channeling feedback from field application to research communities. The TSP goal is to provide Regional Remedial Project Managers (RPMs), Corrective Action Staff, and On-Scene Coordinators (OSCs) with a diverse set of readily-accessible resources for technical assistance. This research summary provides six case studies – two from each of the three TSCs (Ground Water Technical Support Center, Engineering Technical Support Center, and Site Characterization Technical Support Center) – to exemplify and summarize the variety of TSC approaches that contribute to fulfilling the TSP mission. EPA’s Technical Support Centers (TSC) included in ORD’s Safe and Healthy Communities (SHC) Research Action Plan fill the need for supplying subject-matter experts to continually assess state-of-the-art research and practices and channel this informati
Evaluation of ERDA-sponsored coal feed system development
NASA Technical Reports Server (NTRS)
Phen, R. L.; Luckow, W. K.; Mattson, L.; Otth, D.; Tsou, P.
1977-01-01
Coal feeders were evaluated based upon criteria such as technical feasibility, performance (i.e. ability to meet process requirements), projected life cycle costs, and projected development cost. An initial set of feeders was selected based on the feeders' cost savings potential compared with baseline lockhopper systems. Additional feeders were considered for selection based on: (1) increasing the probability of successful feeder development; (2) application to specific processes; and (3) technical merit. A coal feeder development program is outlined.
ERIC Educational Resources Information Center
Luedtke, Cherry Beth
This project evaluates the status of distance learning at 54 public, two-year community, and technical colleges in Texas. Data was collected from the Web sites of each of the institutions. The Web site data indicted that 44 of the colleges refer specifically to distance education courses offered. To assess what student support services are…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-71,711A] Superior Technical Resources and Bestway, Inc., Leased Workers Working On-Site at OSRAM Sylvania, Consumer Lighting Division, a Subsidiary of OSRAM GmbH, St. Marys, PA; Amended Certification Regarding Eligibility To Apply for Worker Adjustment Assistance In accordance with...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vitkus, Timothy J.
2012-04-24
This guidance provides information on methodologies and the technical bases that licensees should consider for incorporating composite sampling strategies into final status survey (FSS) plans. In addition, this guidance also includes appropriate uses of composite sampling for generating the data for other decommissioning site investigations such as characterization or other preliminary site investigations.
Nagarjuna Reddy, Y. V.; Deepika, P. C.; Venkatesh, M. P.; Rajeshwari, K. G.
2016-01-01
Background: The formation of new connective periodontal attachment is contingent upon the elimination or marked reduction of pathogens at the treated periodontal site. An anti-microbial agent, i.e. moxifloxacin has been incorporated into the bone graft to control infection and facilitate healing during and after periodontal therapy. Materials and Methods: By purposive sampling, 15 patients with at least two contralateral vertical defect sites were selected. The selected sites in each individual were divided randomly into test and control sites according to split-mouth design. Test site received moxifloxacin-hydroxyapatite composite graft and control site received hydroxyapatite-placebo gel composite graft. Probing depth (PD) and Clinical attachment level (CAL) were assessed at baseline, 3, 6, 9, and 12 months. Bone probing depth (BPD) and hard tissue parameters such as amount of defect fill, percentage of defect fill, and changes in alveolar crest were assessed at baseline, 6, and 12 months. Changes in subgingival microflora were also assessed by culturing the subgingival plaque samples at baseline and at 3-month follow-up. The clinical, radiographic, and microbiological data obtained were subjected to statistical analysis using descriptive statistics, paired sample t-test, independent t-test, and contingency test. Results: On intragroup comparison at test and control sites, there was a significant improvement in all clinical and radiographic parameters. However, on intergroup comparison of the same, there was no statistically significant difference between test and control sites at any interval. Although test sites showed slightly higher amount of bone fill, it was not statistically significant. There was a significant reduction in the counts of Aggregatibacter actinomycetemcomitans and Porphyromonas gingivalis at both sites from baseline to 3 months. In addition, there was a significant reduction at test sites as compared to control sites at 3-month follow-up (P = 0.003 and P = 0.013). Conclusion: The reduction in microbial counts found in test sites at 3-month follow-up could not bring similar significant improvements in the clinical and radiographic parameters though the test sites showed slightly higher bone fill. PMID:27630501
Golden Gate National Recreation Area : acoustical monitoring 2007/2008
DOT National Transportation Integrated Search
2011-03-01
In 2007, the Natural Sounds Program (NPS) received a technical assistance request to collect baseline acoustical data at Golden Gate National Recreation Area (GGNRA). During the summer (June September 2007) and winter (January February 2008),...
Berlin, Lisa J.; Whiteside-Mansell, Leanne; Roggman, Lori A.; Green, Beth L.; Robinson, JoAnn; Spieker, Susan
2010-01-01
This study examined maternal depression, attachment avoidance, and attachment anxiety as moderators of Early Head Start's effects on four parenting outcomes assessed at age 3. Participants (N = 947) were drawn from six sites of the Early Head Start National Research and Evaluation Project, a multi-site randomized trial. Findings suggest more positive program effects for mothers with less initial attachment avoidance or attachment anxiety. First, baseline attachment avoidance moderated EHS program effects on observed maternal supportiveness, such that program mothers with lower baseline attachment avoidance were rated as more supportive of their 3-year-olds than program mothers with higher baseline attachment avoidance. Second, program effects on spanking varied depending on mothers’ baseline attachment anxiety. PMID:21240694
Berlin, Lisa J; Whiteside-Mansell, Leanne; Roggman, Lori A; Green, Beth L; Robinson, JoAnn; Spieker, Susan
2011-01-01
This study examined maternal depression, attachment avoidance, and attachment anxiety as moderators of Early Head Start's effects on four parenting outcomes assessed at age three. Participants (N = 947) were drawn from six sites of the Early Head Start National Research and Evaluation Project, a multi-site randomized trial. Findings suggest more positive program effects for mothers with less initial attachment avoidance or attachment anxiety. First, baseline attachment avoidance moderated Early Head Start program effects on observed maternal supportiveness, such that program mothers with lower baseline attachment avoidance were rated as more supportive of their three-year-olds than program mothers with higher baseline attachment avoidance. Second, program effects on spanking varied depending on mothers' baseline attachment anxiety.
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. Shafer; M. Y oung; S. Zitzer
2006-01-18
Monolayer evapotranspiration (ET) covers are the baseline method for closure of disposal sites for low-level radioactive waste (LLW), mixed LLW, and transuranic (TRU) waste at the Nevada Test Site (NTS). The regulatory timeline is typically 1,000 years for LLW and 10,000 years for TRU waste. Covers for such waste have different technical considerations than those with shorter timelines because they are subject to environmental change for longer periods of time, and because the environmental processes are often coupled. To evaluate these changes, four analog sites (approximately 30, 1,000 to 2,000, 7,000 to 12,500, and 125,000 years in age) on themore » NTS were analyzed to address the early post-institutional control period (the youngest site), the 1,000-year compliance period for disposal of LLW, and the 10,000-year period for TRU waste. Tests included soil texture, structure, and morphology; surface soil infiltration and hydraulic conductivity; vegetation and faunal surveys; and literature reviews. Separate measurements were made in plant undercanopy and intercanopy areas. The results showed a progressive increase in silt and clay content of surface soils with age. Changes in soil texture and structure led to a fivefold decline in saturated hydraulic conductivity in intercanopy areas, but no change in undercanopies, which were subject to bioturbation. These changes may have been responsible for the reduction in total plant cover, most dramatically in intercanopy areas, primarily because more precipitation either runs off the site or is held nearer to the surface where plant roots are less common. The results suggest that covers may evolve over longer timeframes to stable landforms that minimize the need for active maintenance.« less
This asset includes a number of individual data sets related to site-specific information for Superfund, which is governed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980, which was amended by the Superfund Amendments and Reauthorization Act (SARA) in 1986. The Superfund Enterprise Management System (SEMS) contains basic site description, location, schedule of activities, enforcement and settlement data, contaminants and selected remedy and much more, as well as the records that clearly document site decisions. This asset also includes sampling data and lab results (CLPSS, EDDs), redevelopment and technical assistance case studies, site reuse and land revitalization information, EPAOSC.net information, Superfund Technical Assistance Grants information, site management information records (RODs, Remediation plans, cleanup directives), contract management information, and more.Superfund site management information can also be found in agency wide systems such as EAS and COMPASS.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berg, M.T.; Reed, B.E.; Gabr, M.
1993-07-01
West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushingmore » (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.« less
Wade, S.; Greenberg, S.
2009-01-01
This paper introduces the concept of social site characterization as a parallel effort to technical site characterization to be used in evaluating and planning carbon dioxides capture and storage (CCS) projects. Social site characterization, much like technical site characterization, relies on a series of iterative investigations into public attitudes towards a CCS project and the factors that will shape those views. This paper also suggests ways it can be used to design approaches for actively engaging stakeholders and communities in the deployment of CCS projects. This work is informed by observing the site selection process for FutureGen and the implementation of research projects under the Regional Carbon Sequestration Partnership Program. ?? 2009 Elsevier Ltd. All rights reserved.
75 FR 16461 - Meeting of the Mobile Sources Technical Review Subcommittee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
... ENVIRONMENTAL PROTECTION AGENCY Meeting of the Mobile Sources Technical Review Subcommittee AGENCY... Committee Act, Public Law 92- 463, notice is hereby given that the Mobile Sources Technical Review... site: http://www.epa.gov/air/caaac/mobile_sources.html . MSTRS listserver subscribers will receive...
Levine, Sharon A; Chao, Serena H; Caruso, Lisa B; Jackson, Angela H; Russell, Matthew L; Young, Megan E; Brett, Belle
2018-06-05
Nongeriatricians must acquire skills and knowledge in geriatric medicine to ensure coordinated care of older adults' complex conditions by interspecialty and interprofessional teams. Chief residents (CRs) are an ideal target for an educational intervention. This study examined whether the Boston Medical Center (BMC) Chief Resident Immersion Training (CRIT) in the Care of Older Adults was replicable at diverse medical institutions. Between 2008 and 2010, 12 institutions in 11 states received funding, technical support, and a common program model. Each implemented 2.5-day CRITs, consisting of a patient case, geriatrics-related lectures, CR leadership sessions, action project planning, and networking time. Site faculty conducted 21 CRITs for 295 CRs representing 28 specialties. CRs completed knowledge pre- and post-tests, and self-report baseline and 6-month follow-up surveys. Outcome measures were change in pre- and post-test score; and change from baseline to six-months in self-reported surveys. Response rate for CRs was 99% (n = 293) for the pre-post tests and 78% (n = 231) for matchable baseline and six-month follow-up surveys. Participants' knowledge increased from 6.32 to 8.39 (P < .001) averaged from 12 questions. CRs' self-reported ability to apply clinical problem-solving skills to older patients (P < .001), number of geriatrics topics taught (P < .001), frequency of geriatrician consultations s (P = .017), confidence in leadership skills (P < .001), and confidence to conduct CR work (P < .001) increased from baseline to follow-up. CRIT is an innovative way to give non-geriatricians knowledge and skills to treat complex older patients.Written work prepared by employees of the Federal Government as part of their official duties is, under the U.S. Copyright Act, a "work of the United States Government" for which copyright protection under Title 17 of the United States Code is not available. As such, copyright does not extend to the contributions of employees of the Federal Government.
The effect of tracking network configuration on GPS baseline estimates for the CASA Uno experiment
NASA Technical Reports Server (NTRS)
Wolf, S. Kornreich; Dixon, T. H.; Freymueller, J. T.
1990-01-01
The effect of the tracking network on long (greater than 100 km) GPS baseline estimates was estimated using various subsets of the global tracking network initiated by the first Central and South America (CASA Uno) experiment. It was found that best results could be obtained with a global tacking network consisting of three U.S. stations, two sites in the southwestern Pacific, and two sites in Europe. In comparison with smaller subsets, this global network improved the baseline repeatability, the resolution of carrier phase cycle ambiguities, and formal errors of the orbit estimates.
1987-10-01
will be addressed as the Testbed is constructed: 0. (1) How can a large cluster of simulators be networked at a singie " site ? [For example, a battalion... network and its subject LAN sites networked with Lt-N technology. *-" m-artter were based umDn technical and military There will be 324 simulators in all...If all sites "Cori consicerations. were active at one time, 1,400 troops would be involved- The technical assessment was that a local area network
Crustal dynamics project data analysis, 1988: VLBI geodetic results, 1979 - 1987
NASA Technical Reports Server (NTRS)
Ma, C.; Ryan, J. W.; Caprette, D.
1989-01-01
The results obtained by the Goddard VLBI (very long base interferometry) Data Analysis Team from the analysis of 712 Mark 3 VLBI geodetic data sets acquired from fixed and mobile observing sites through the end of 1987 are reported. A large solution, GLB401, was used to obtain earth rotation parameters and site velocities. A second large solution, GLB405, was used to obtain baseline evolutions. Radio source positions were estimated globally while nutation offsets were estimated from each data set. Site positions are tabulated on a yearly basis from 1979 through 1988. The results include 55 sites and 270 baselines.
Sortie laboratory, phase B technical summary. [design and operational requirements
NASA Technical Reports Server (NTRS)
1973-01-01
The design and operational requirements which evolved from Sortie Lab (SL) analysis are summarized. A source of requirements for systems is given along with experimental support for the SL, baseline. Basic design data covered include: configuration definition, mission analysis, experimental integration, safety, and logistics. A technical summary outlines characteristics which reflect the influence of the growth in SL capability and the results of the mission and operational analysis. Each of the selected areas is described in terms of objectives, equipment, operational concept, and support requirements.
Technical support for the EPA cleanup rule on radioactively contaminated sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hull, H.B.; Newman, A.; Wolbarst, A.B.
1995-12-31
The U.S. Environmental Protection Agency (EPA) is developing a radiation site cleanup regulation for the protection of the public from radionuclide contamination at sites that are to be cleaned up and released for public use. The regulation will apply to sites under the control of Federal agencies, and to sites licensed by the Nuclear Regulatory Commission (NRC) or NRC Agreement States. The agency is therefore conducting a comprehensive technical analysis aimed at developing information that will be used to support the rule. This presentation describes the regulation and the approach developed to determine how radiological health impacts and volumes ofmore » soil requiring remediation vary as functions of the possible cleanup dose or risk level.« less
Franceschini, M.D.; Custer, Christine M.; Custer, T.W.; Reed, J.M.; Romero, L.M.
2008-01-01
We assayed baseline and stress-induced corticosterone concentrations from adult female and nestling tree swallows, Tachycineta bicolor, from New England, USA, sites with different levels of contamination with polychlorinated biphenyls (PCBs) and 2,3,7,8-tetrachlorodibenzo-p-dioxin (TCDD). Corticosterone was compared over 2 years from a highly contaminated PCB site along the Housatonic River (Berkshire County, MA, USA), a midrange contaminated site upstream, and a reference site. Adult females (n = 29), sampled only in 2003, showed an inverted-U association with PCBs, with higher stress-induced corticosterone with midrange contamination than at the high-contamination site. In nestlings, stress-induced corticosterone was highest for the highly contaminated site compared with the other sites in 2003 (n = 53, 29 nests), with no difference among sites in 2004 (n = 93, 27 nests). In 2004, we began testing mechanisms underlying these changes in nestlings at the high- and low-PCB sites. Corticosterone response to dexamethasone injection (used to test negative feedback) was not different between sites, but stress-induced corticosterone was reduced at the contaminated site after adrenocorticotropin hormone injection (used to test adrenal responsiveness), suggesting an inhibited ability to mount a stress response. We also compared nestlings from a stretch of the Woonasquatucket River, Rhode Island, USA, heavily contaminated with TCDD (n = 80, 43 nests) with nestlings from an upstream site that had lower levels of TCDD and the Berkshire County reference site. Although there were no stress-induced differences, baseline corticosterone was lower at the higher TCDD site than at the reference site. Altogether these findings suggest that tree swallows chronically exposed to high PCB and TCDD levels exhibit altered baseline and stress-induced corticosterone responses, but the patterns of alteration might not be predictable. ?? 2008 SETAC.
Transluminal Angioplasty of Peroneal Artery Branches in Diabetics: Initial Technical Experience
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graziani, Lanfroi, E-mail: langrazi@tin.it; Silvestro, Antonio; Monge, Luca
2008-01-15
The present study aimed to report the technical feasibility of percutaneous transluminal angioplasty (PTA) of obstructed or insufficient collateral branches (anterior and posterior perforating branches) from distal peroneal to foot arteries in diabetic patients with chronic critical limb ischemia (CLI) and chronic noncrossable occlusion of the anterior and posterior tibial arteries. Twenty-four diabetic CLI patients (age, 67 {+-} 8 years; 87% males) undergoing collateral PTA were included. Baseline clinical angiographic and follow-up data were retrospectively reviewed. Collateral PTA was associated with a concomitant PTA of other sites in 21 (83%) cases. In 15 cases the treated collateral linked the peronealmore » with the plantaris communis; in 9 cases, the peroneal with the dorsalis pedis. Angiographic results of collateral PTA were good in 13 cases (<30% residual stenosis), whereas the result was considered moderate (30%-49% residual stenosis) in the remaining cases. Neither perforation nor acute occlusion of the treated collaterals or other relevant complications were observed. Mean follow-up was 32 {+-} 17 months. Major amputation was necessary for two (8.3%) patients. Cumulative limb salvage rates at 2 and 4 years were 96% and 87%, respectively. In conclusion, this initial experience shows that PTA of the collateral branches from distal peroneal to foot arteries is a feasible technique. Future studies are required to define the clinical role of this novel approach.« less
The m/r SEBT: development of a functional screening tool for dance educators.
Wilson, Margaret; Batson, Glenna
2014-12-01
Dance screenings provide direct and indirect data bearing on a dancer's readiness to undertake rigorous physical training. Rarely, however, are dance teachers able to translate results from these screenings into practical technical knowledge. In this article, an example of a preseason assessment tool is presented that translates scientific findings into useful information for dance teachers conducting auditions. Designed as a baseline assessment of the dancer during auditioning, the m/r SEBT tool helps teachers stratify technical levels, identify injury risk, and consequently assist with immediate and appropriate recommendations for supplemental training and//or follow-up with a medical professional. The tool evolved out of more than 3 years of collaborative, multisite research utilizing the Star Excursion Balance Test (SEBT) as a dynamic test of balance. Modifications were made to render the test more dance-specific and to increase balance challenges. Within the 3-year period, more than 100 dancers were tested in four sites, two in the United States and two in the United Kingdom. Despite the relatively large collective sample size, neither the original SEBT nor its modifications (m/r SEBT) held robust face or content validity as balance screens. What did emerge, however, were qualitative criteria that the authors organized into a feasible assessment tool for preseason auditions. While this tool awaits further validation, its current evolution helps serve as a bridge between dance teachers' clinical and practical knowledge.
Stent Retriever Thrombectomy in Different Thrombus Locations of Anterior Cerebral Circulation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Protto, Sara; Sillanpää, Niko, E-mail: niko.sillanpaa@pshp.fi; Pienimäki, Juha-Pekka
BackgroundMechanical thrombectomy (MT) is a safe and efficient treatment for acute ischemic stroke in patients with proximal anterior occlusion and large penumbra. We evaluated the technical and clinical success of MT in relation to the location of the occlusion (internal carotid artery, M1 and M2 segments of the middle cerebral artery).MethodsWe prospectively reviewed 130 patients of whom 105 met the inclusion criteria. Baseline clinical, procedural and imaging variables, technical outcome (TICI, thrombolysis in cerebral infarction), 24 h imaging outcome and three-month clinical outcome (mRS, modified Rankin Scale) were recorded. Differences between the groups were studied with statistical tests according to themore » type of the variable.ResultsThere were 37, 46 and 22 patients in the internal carotid artery (ICA), M1 and M2 groups, respectively. TICI 2b or 3 was achieved in 92 cases (88 %) with a non-significant trend towards a better recanalization outcome in the ICA and M1 groups. Overall, 57 of the 105 patients (55 %) experienced favorable clinical outcome (mRS ≤ 2) with no significant differences between the groups. Excellent outcome (mRS ≤ 1) was seen in 40 patients (39 %) and there proportionally more patients with excellent outcome in the ICA and M1 groups (ICA: 44 %, M1: 41 %, M2: 23 % of patients, p = 0.22).ConclusionsThere were no statistically significant differences in the technical or clinical outcomes between the different sites of occlusion (ICA, M1 or M2). There was a non-significant trend towards achieving excellent clinical outcome (3-month mRS ≤ 1) more often and better recanalization results in the two more proximal locations.« less
Rosen, Amy K; Loveland, Susan A; Romano, Patrick S; Itani, Kamal M F; Silber, Jeffrey H; Even-Shoshan, Orit O; Halenar, Michael J; Teng, Yun; Zhu, Jingsan; Volpp, Kevin G
2009-07-01
Improving patient safety was a strong motivation behind duty hour regulations implemented by Accreditation Council for Graduate Medical Education on July 1, 2003. We investigated whether rates of patient safety indicators (PSIs) changed after these reforms. Observational study of patients admitted to Veterans Health Administration (VA) (N = 826,047) and Medicare (N = 13,367,273) acute-care hospitals from July 1, 2000 to June 30, 2005. We examined changes in patient safety events in more versus less teaching-intensive hospitals before (2000-2003) and after (2003-2005) duty hour reform, using conditional logistic regression, adjusting for patient age, gender, comorbidities, secular trends, baseline severity, and hospital site. Ten PSIs were aggregated into 3 composite measures based on factor analyses: "Continuity of Care," "Technical Care," and "Other" composites. Continuity of Care composite rates showed no significant changes postreform in hospitals of different teaching intensity in either VA or Medicare. In the VA, there were no significant changes postreform for the technical care composite. In Medicare, the odds of a Technical Care PSI event in more versus less teaching-intensive hospitals in postreform year 1 were 1.12 (95% CI; 1.01-1.25); there were no significant relative changes in postreform year 2. Other composite rates increased in VA in postreform year 2 in more versus less teaching-intensive hospitals (odds ratio, 1.63; 95% CI; 1.10-2.41), but not in Medicare in either postreform year. Duty hour reform had no systematic impact on PSI rates. In the few cases where there were statistically significant increases in the relative odds of developing a PSI, the magnitude of the absolute increases were too small to be clinically meaningful.
Elkashef, Ahmed; Rawson, Richard A; Smith, Edwina; Pearce, Valerie; Flammino, Frank; Campbell, Jan; Donovick, Roger; Gorodetzky, Charles; Haning, William; Mawhinney, Joseph; McCann, Michael; Weis, Dennis; Williams, Lorie; Ling, Walter; Vocci, Frank
2007-04-01
In order to increase the number of investigative teams and sites conducting research on pharmacological treatments for methamphetamine use disorders, the National Institute on Drug Abuse (NIDA) established an infrastructure of clinical sites in areas where methamphetamine addiction is prevalent. This multi-site infrastructure would serve to run multiple Phases II and III protocols effectively and expeditiously. NIDA collaborated with investigators from the University of California at Los Angeles (UCLA) to set up the Methamphetamine Clinical Trials Group (MCTG). This paper describes the development process, as well as data from a test trial to assess the capability of research-naive sites to recruit research participants and conduct study procedures according to research protocol. Subsequent trials are also described. A total of 151 candidates signed consent; 65 individuals were enrolled and 35 (53.8%) completed the 12 weeks' behavioral trial. Self-reported substance use report (SUR) showed comparable use of methamphetamine across sites with the individual site means ranging from 59% (site 5) to 80% (site 3). Drug use as measured by urinalysis was greatly reduced at week 13 compared to the baseline measure; the average rate of methamphetamine-free urine samples across all participants in sites at week 13 was 53%. The highest percentage of methamphetamine-free samples was 85% at site 5; the lowest was at site 1 (40%). Addiction severity index (ASI) composite scores at baseline and protocol completion for all participants demonstrated improvement in all categories over time, except for the medical composite score. The largest composite score reduction in baseline-protocol completion was in the drug domain (0.23 versus 0.15). The changes in the ASI scores from baseline to week 13 were consistent across all five sites. Outcomes of the behavioral trial indicated that the MCTG recruited well; collected study data accurately and reliably; and created a vehicle that can assess promising pharmacotherapies for methamphetamine addiction treatment medications. The MCTG strategy appears to be a feasible approach to increase NIDA's capacity to conduct clinical trials to evaluate potential pharmacotherapies for methamphetamine addiction.
Implementation of Evidence-Based Employment Services in Specialty Mental Health
Hamilton, Alison B; Cohen, Amy N; Glover, Dawn L; Whelan, Fiona; Chemerinski, Eran; McNagny, Kirk P; Mullins, Deborah; Reist, Christopher; Schubert, Max; Young, Alexander S
2013-01-01
Objective. Study a quality improvement approach for implementing evidence-based employment services at specialty mental health clinics. Data Sources/Study Setting. Semistructured interviews with clinicians and administrators before, during, and after implementation. Qualitative field notes, structured baseline and follow-up interviews with patients, semistructured interviews with patients after implementation, and administrative data. Study Design. Site-level controlled trial at four implementation and four control sites. Hybrid implementation–effectiveness study with mixed methods intervention evaluation design. Data Collection/Extraction Methods. Site visits, in-person and telephone interviews, patient surveys, patient self-assessment. A total of 801 patients completed baseline surveys and 53 clinicians and other clinical key stakeholders completed longitudinal qualitative interviews. Principal Findings. At baseline, sites varied in the availability, utilization, and quality of supported employment. Each site needed quality improvement for this service, though for differing reasons, with some needing development of the service itself and others needing increased service capacity. Improvements in knowledge, attitudes, beliefs, and referral behaviors were evident in mid- and postimplementation interviews, though some barriers persisted. Half of patients expressed an interest in working at baseline. Patients at implementation sites were 2.3 times more likely to receive employment services during the study year. Those who had a service visit were more likely to be employed at follow-up than those who did not. Conclusions. Studies of implementation and effectiveness require mixed methods to both enhance implementation in real time and provide context for interpretation of complex results. In this study, a quality improvement approach resulted in superior patient-level outcomes and improved clinician knowledge, attitudes, and behaviors, in the context of substantial variation among sites. PMID:24138608
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anton, David
The proposed project built on the foundation of over several years years of intensive and ground-breaking R&D work at Cellana's Kona Demonstration Facility (KDF). Phycological and engineering solutions were provided to tackle key cultivation issues and technical barriers limiting algal biomass productivity identified through work conducted outdoors at industrial (1 acre) scale. The objectives of this project were to significantly improve algal biomass productivity and reduce operational cost in a seawater-based system, using results obtained from two top-performing algal strains as the baseline while technically advancing and more importantly, integrating the various unit operations involved in algal biomass production, processing,more » and refining.« less
NASA's Contribution to Global Space Geodesy Networks
NASA Technical Reports Server (NTRS)
Bosworth, John M.
1999-01-01
The NASA Space Geodesy program continues to be a major provider of space geodetic data for the international earth science community. NASA operates high performance Satellite Laser Ranging (SLR), Very Long Baseline Interferometry (VLBI) and Global Positioning System (GPS) ground receivers at well over 30 locations around the world and works in close cooperation with space geodetic observatories around the world. NASA has also always been at the forefront in the quest for technical improvement and innovation in the space geodesy technologies to make them even more productive, accurate and economical. This presentation will highlight the current status of NASA's networks; the plans for partnerships with international groups in the southern hemisphere to improve the geographic distribution of space geodesy sites and the status of the technological improvements in SLR and VLBI that will support the new scientific thrusts proposed by interdisciplinary earth scientists. In addition, the expanding role of the NASA Space geodesy data archive, the CDDIS will be described.
Bias error reduction using ratios to baseline experiments. Heat transfer case study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chakroun, W.; Taylor, R.P.; Coleman, H.W.
1993-10-01
Employing a set of experiments devoted to examining the effect of surface finish (riblets) on convective heat transfer as an example, this technical note seeks to explore the notion that precision uncertainties in experiments can be reduced by repeated trials and averaging. This scheme for bias error reduction can give considerable advantage when parametric effects are investigated experimentally. When the results of an experiment are presented as a ratio with the baseline results, a large reduction in the overall uncertainty can be achieved when all the bias limits in the variables of the experimental result are fully correlated with thosemore » of the baseline case. 4 refs.« less
Epibenthic assessment of a renewable tidal energy site.
Sheehan, Emma V; Gall, Sarah C; Cousens, Sophie L; Attrill, Martin J
2013-01-01
Concern over global climate change as a result of fossil fuel use has resulted in energy production from renewable sources. Marine renewable energy devices provide clean electricity but can also cause physical disturbance to the local environment. There is a considerable paucity of ecological data at potential marine renewable energy sites that is needed to assess potential future impacts and allow optimal siting of devices. Here, we provide a baseline benthic survey for the Big Russel in Guernsey, UK, a potential site for tidal energy development. To assess the suitability of proposed sites for marine renewable energy in the Big Russel and to identify potential control sites, we compared species assemblages and habitat types. This baseline survey can be used to select control habitats to compare and monitor the benthic communities after installation of the device and contribute towards the optimal siting of any future installation.
Basic research for the geodynamics program
NASA Technical Reports Server (NTRS)
Mueller, I. I.
1985-01-01
The current technical objectives for the geodynamics program consist of (1) optimal utilization of laser and Very Long Baseline Interferometry (VLBI) observations for reference frames for geodynamics; (2) utilization of range difference observations in geodynamics; and (3) estimation techniques in crustal deformation analysis.
Feasibility study: Atmospheric general circulation experiment, volume 2
NASA Technical Reports Server (NTRS)
Homsey, R. J. (Editor)
1981-01-01
The feasibility analysis of the atmospheric general circulation experiment (AGCE) are documented. The analysis performed in each technical area, the rationale and substantiation for the design approaches selected for the hardware, and the design details for the baseline AGCE are presented.
Freight Advanced Traveler Information System (FRATIS) : Dallas-Fort Worth demonstration plan.
DOT National Transportation Integrated Search
2013-06-01
This document describes the Demonstration Plan for the FRATIS system. The demonstration component of this task will serve to test the technical feasibility of the FRATIS prototype while also facilitating the collection of baseline and performance dat...
2017-08-01
gravimetric water content ................................... 16 8 Baseline organic matter content as measured by loss on ignition. Each bar represents one...whereby organ - isms, mainly microbes, are stimulated to break down contaminants of con- cern into innocuous end products. In recent years...gasoline and 4000 L of JP-5. This site has been monitored for gasoline range organics , diesel range or- ganics, and volatile organic compounds
Code of Federal Regulations, 2010 CFR
2010-07-01
... supporting technical analysis and any other relevant information and data that would support such site... event. The technical analysis of the discharge of pollutants must include: (A) All daily inputs to the... the supporting technical analysis, including inspection of the CAFO. (3) The CAFO shall attain the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... Crime Training and Technical Assistance Center (OVC TTAC) Feedback Form Package ACTION: 60-Day Notice of... institutions; Businesses or other for-profit. Abstract: The Office for Victims of Crime Training and Technical... forms to recipients of training and technical assistance, scholarship applicants, users of the Web site...
Code of Federal Regulations, 2011 CFR
2011-07-01
... supporting technical analysis and any other relevant information and data that would support such site... event. The technical analysis of the discharge of pollutants must include: (A) All daily inputs to the... the supporting technical analysis, including inspection of the CAFO. (3) The CAFO shall attain the...
NASA Technical Reports Server (NTRS)
2005-01-01
The Baseline Report captures range and spaceport capabilities at five sites: KSC, CCAFS, VAFB, Wallops, and Kodiak. The Baseline depicts a future state that relies on existing technology, planned upgrades, and straight-line recapitalization at these sites projected through 2030. The report presents an inventory of current spaceport and range capabilities at these five sites. The baseline is the first part of analyzing a business case for a set of capabilities designed to transform U.S. ground and space launch operations toward a single, integrated national "system" of space transportation systems. The second part of the business case compares current capabilities with technologies needed to support the integrated national "system". The final part, a return on investment analysis, identifies the technologies that best lead to the integrated national system and reduce recurring costs..Numerous data sources were used to define and describe the baseline spaceport and range by identifying major systems and elements and describing capabilities, limitations, and capabilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burger, Joanna; Environmental and Occupational Health Sciences Institute, Piscataway, NJ; Gochfeld, Michael
2012-07-01
As the Department of Energy (DOE) continues to remediate its lands, and to consider moving toward long-term stewardship and the development of energy parks on its industrial, remediated land, it is essential to adequately characterize the environment around such facilities to protect society, human health, and the environment. While DOE sites re considering several different land-use scenarios, all of them require adequate protection of the environment. Even if DOE lands are developed for energy parks that are mainly for industrializes sections of DOE lands that will not be remediated to residential standards, there is still the need to consider themore » protection of human health and the environment. We present an approach to characterization and establishment of teams that will gather the information, and integrate that information for a full range of stakeholders from technical personnel, to public policy makers, and that public. Such information is needed to establish baselines, site new energy facilities in energy parks, protect existing nuclear facilities and nuclear wastes, improve the basis for emergency planning, devise suitable monitoring schemes to ensure continued protection, provide data to track local and regional response changes, and for mitigation, remediation and decommissioning planning. We suggest that there are five categories of information or data needs, including 1) geophysical, sources, fate and transport, 2) biological systems, 3) human health, 4) stakeholder and environmental justice, and 5) societal, economic, and political. These informational needs are more expansive than the traditional site characterization, but encompass a suite of physical, biological, and societal needs to protect all aspects of human health and the environment, not just physical health. We suggest a Site Committee be established that oversees technical teams for each of the major informational categories, with appropriate representation among teams and with a broad involvement of a range of governmental personnel, natural and social scientists, Native Americans, environmental justice communities, and other stakeholders. Such informational teams (and Oversight Committee) would report to a DOE-designated authority or Citizen's Advisory Board. Although designed for nuclear facilities and energy parks on DOE lands, the templates and information teams can be adapted for other hazardous facilities, such as a mercury storage facility at Oak Ridge. (authors)« less
Woodward-Lopez, Gail; Kao, Janice; Kuo, Elena S; James, Paula; Lenhart, Kitty; Becker, Christina; Boyle, Kathryn; Williamson, Dana; Rauzon, Suzanne
2018-05-01
From 2012 to 2014, a total of 17 family child care homes participated in a multisector, community-wide initiative to prevent obesity. Strategies included staff workshops, materials, site visits, and technical assistance regarding development and implementation of nutrition policies. The purpose of the evaluation was to examine the impact of the initiative on family child care home nutrition-related policies and practices and child dietary intake. Pre- and post-intervention without control group. Measures taken at baseline and follow-up included structured observations and questionnaires regarding nutrition policies, practices, and environments; documentation of lunch foods served on 5 days; and lunch plate waste observations on 2 days. Paired t-tests were used to determine the significance of change over time. Seventeen family child care homes in a low-income diverse community in Northern California; children aged 2-5 years who attended the family child care homes. Change in nutrition-related policies and practices, lunch foods served and consumed. Data was collected at 17 sites for an average of 5.2 children aged 2-5 years per site per day at baseline and 4.6 at follow-up for a total of 333 plate waste observations. There were significant increases in staff training, parental involvement, and several of the targeted nutrition-related practices; prevalence of most other practices either improved or was maintained over time. There were significant increases in the number of sites meeting Child and Adult Care Food Program meal guidelines, variety of fruit and frequency of vegetables offered, and reductions in frequency of juice and high-fat processed meats offered. Adequate portions of all food groups were consumed at both time points with no significant change over time. A simple, policy-focused intervention by a child care resource and referral agency was successful at reinforcing and improving upon nutrition-related practices at family child care homes. Children consumed adequate, but not excessive, portions of the balanced meals served to them, suggesting there is no reason to offer unhealthy options. This article is part of a supplement entitled Building Thriving Communities Through Comprehensive Community Health Initiatives, which is sponsored by Kaiser Permanente, Community Health. Copyright © 2018 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.
TECHNICAL APPROACHES TO CHARACTERIZING AND ...
The document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will need to base assessment and cleanup activities on the conditions of the particular sites with which they are dealing. A site assessment strategy should address: the type and extent of contamination, if any, that is present, the types of data needed to adequately assess the site; appropriate sampling and analytical methods to characterize the contamination; acceptable level of uncertainty and cleanup technologies that contain or treat the types of wastes present.This document includes references to state agency roles including the Voluntary Cleanup Program, public involvement and other guidances that may be used. Information
18. SITE BUILDING 002 SCANNER BUILDING VIEW OF ...
18. SITE BUILDING 002 - SCANNER BUILDING - VIEW OF SITE SECURITY OFFICE ACCESS DOOR FROM EXTERIOR OF OFFICE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
Interannual variability in baseline carbon monoxide (CO) and ozone (O3), defined as mixing ratios under minimal influence of recent and local emissions, was studied for seven rural sites in the Northeast US over 2001–2010. Annual baseline CO exhibited statistically signific...
Environmental baseline study of the Huron River Watershed, Baraga and Marquette Counties, Michigan
Woodruff, Laurel G.; Weaver, Thomas L.; Cannon, William F.
2010-01-01
This report summarizes results of a study to establish water-quality and geochemical baseline conditions within a small watershed in the Lake Superior region. In 2008, the U.S. Geological Survey (USGS) completed a survey of water-quality parameters and soil and streambed sediment geochemistry of the 83 mi2 Huron River Watershed in the Upper Peninsula of Michigan. Streamflow was measured and water-quality samples collected at a range of flow conditions from six sites on the major tributaries of the Huron River. All water samples were analyzed for a suite of common ions, nutrients, and trace metals. In addition, water samples from each site were analyzed for unfiltered total and methylmercury once during summer low-flow conditions. Soil samples were collected from 31 sites, with up to 4 separate samples collected at each site, delineated by soil horizon. Streambed sediments were collected from 11 sites selected to cover most of the area drained by the Huron River system. USGS data were supplemented with ecological assessments completed in 2006 by the Michigan Department of Environmental Quality using a modified version of their Great Lakes Environmental Assessment Section procedure 51, and again during 2008 using volunteers under supervision of the Michigan Department of Natural Resources. Results from this study define a hydrological, geological, and environmental baseline for the Huron River Watershed prior to any significant mineral exploration or development. Results from the project also serve to refine the design of future regional environmental baseline studies in the Lake Superior Basin.
Technical guidelines for environmental dredging of contaminated sediments
DOT National Transportation Integrated Search
2008-09-01
This report provides technical guidelines for evaluating : environmental dredging as a sediment remedy component. This document : supports the Contaminated Sediment Remediation Guidance for : Hazardous Waste Sites, released by the U.S. Environmental ...
Turbidity monitoring at select MDOT construction sites.
DOT National Transportation Integrated Search
2012-06-01
The objective of this project was to establish baseline turbidity conditions at select construction : sites by establishing a water quality monitoring program and documenting MDOT approved : BMPs on site. In 2009 the United States Environmental Prote...
Technology assessment for an integrated PC-based platform for three telemedicine applications
NASA Astrophysics Data System (ADS)
Tohme, Walid G.; Hayes, Wendelin S.; Dai, Hailei L.; Komo, Darmadi; Pahira, John J.; Abernethy, Darrell R.; Rennert, Wolfgang; Kuehl, Karen S.; Hauser, Gabriel J.; Mun, Seong K.
1996-05-01
This paper investigates the design and technical efficacy of an integrated PC based platform for three different medical applications. The technical efficacy of such a telemedicine platform has not been evaluated in the literature and optimal technical requirements have not been developed. The first application, with the Department of Surgery, Division of Urology, tests the utility of a telemedicine platform including radiology images for a surgical stone disease consultation service from an off site location in West Virginia. The second application, with the Department of Internal Medicine, Division of Clinical Pharmacology, investigates the usefulness of telemedicine when used for a clinical pharmacology consultation service from an off-site location. The third application, with the Department of Pediatrics, will test telemedicine for trauma care triage service first within an off-site location in Virginia and then from there to Georgetown University Medical Center.
Jarc, Anthony M; Curet, Myriam
2015-08-01
Validated training exercises are essential tools for surgeons as they develop technical skills to use robot-assisted minimally invasive surgical systems. The purpose of this study was to show face, content, and construct validity of four, inanimate training exercises using the da Vinci (®) Si surgical system configured with Single-Site (™) instrumentation. New (N = 21) and experienced (N = 6) surgeons participated in the study. New surgeons (11 Gynecology [GYN] and 10 General Surgery [GEN]) had not completed any da Vinci Single-Site cases but may have completed multiport cases using the da Vinci system. They participated in this study prior to attending a certification course focused on da Vinci Single-Site instrumentation. Experienced surgeons (5 GYN and 1 GEN) had completed at least 25 da Vinci Single-Site cases. The surgeons completed four inanimate training exercises and then rated them with a questionnaire. Raw metrics and overall normalized scores were computed using both video recordings and kinematic data collected from the surgical system. The experienced surgeons significantly outperformed new surgeons for many raw metrics and the overall normalized scores derived from video review (p < 0.05). Only one exercise did not achieve a significant difference between new and experienced surgeons (p = 0.08) when calculating an overall normalized score using both video and advanced metrics derived from kinematic data. Both new and experienced surgeons rated the training exercises as appearing, to train and measure technical skills used during da Vinci Single-Site surgery and actually testing the technical skills used during da Vinci Single-Site surgery. In summary, the four training exercises showed face, content, and construct validity. Improved overall scores could be developed using additional metrics not included in this study. The results suggest that the training exercises could be used in an overall training curriculum aimed at developing proficiency in technical skills for surgeons new to da Vinci Single-Site instrumentation.
Sources of Variance in Baseline Gene Expression in the Rodent Liver
The use of gene expression profiling in both clinical and laboratory settings would be enhanced by better characterization of variation due to individual, environmental, and technical factors. Analysis of microarray data from untreated or vehicle-treated animals within the contro...
Vandecasteele, Bart; Quataert, Paul; De Vos, Bruno; Tack, Filip M G; Muys, Bart
2004-04-01
Many alluvial soils along navigable waterways are affected by disposal of dredged sediments or overbank sedimentation and contain metal concentrations that are elevated compared to baseline levels. Uptake patterns for metals and other elements by several volunteer Salix species growing on these sites were determined during a growing season in field plots and compared with the same species growing on soils with baseline contamination levels. For Cd and Zn, foliar concentrations were clearly higher on dredged sediment landfills. Uptake patterns differed significantly between species. A high uptake of Mn and low uptake of Cu, K and S in S. cinerea was attributed to wetland soil chemistry. Site effects on metal uptake were evaluated in more detail for Salix cinerea and S. alba growing on different sediment-derived sites under field conditions. Foliar Cd concentrations were higher in S. cinerea than in S. alba. This appeared to be a genetic feature not influenced by soil chemical properties, as it was observed both on clean sites and polluted sediment-derived sites. For S. cinerea, soil chemistry was reflected in foliar concentrations, while foliar Cd concentrations and bioavailability were found to be independent of the thickness of the polluted horizon. Dredged sediment landfills and freshwater tidal marshes with comparable Cd soil pollution had significantly different foliar Cd concentrations.
NASA Technical Reports Server (NTRS)
Mitrovica, J. X.; Davis, J. L.; Shapiro, I. I.
1993-01-01
We predict the present-day rates of change of the lengths of 19 North American baselines due to the glacial isostatic adjustment process. Contrary to previously published research, we find that the three dimensional motion of each of the sites defining a baseline, rather than only the radial motions of these sites, needs to be considered to obtain an accurate estimate of the rate of change of the baseline length. Predictions are generated using a suite of Earth models and late Pleistocene ice histories, these include specific combinations of the two which have been proposed in the literature as satisfying a variety of rebound related geophysical observations from the North American region. A number of these published models are shown to predict rates which differ significantly from the VLBI observations.
A method to characterise site, urban and regional ambient background radiation.
Passmore, C; Kirr, M
2011-03-01
Control dosemeters are routinely provided to customers to monitor the background radiation so that it can be subtracted from the gross response of the dosemeter to arrive at the occupational dose. Landauer, the largest dosimetry processor in the world with subsidiaries in Australia, Brazil, China, France, Japan, Mexico and the UK, has clients in approximately 130 countries. The Glenwood facility processes over 1.1 million controls per year. This network of clients around the world provides a unique ability to monitor the world's ambient background radiation. Control data can be mined to provide useful historical information regarding ambient background rates and provide a historical baseline for geographical areas. Historical baseline can be used to provide site or region-specific background subtraction values, document the variation in ambient background radiation around a client's site or provide a baseline for measuring the efficiency of clean-up efforts in urban areas after a dirty bomb detonation.
78 FR 1143 - Explosive Siting Requirements; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
... launch site operators in site planning for the storage and handling of energetic liquids and explosives...: For technical questions concerning this final rule, contact Yvonne Tran, Commercial Space... this final rule, contact Laura Montgomery, AGC 200, [[Page 1144
De Feo, Giovanni; De Gisi, Sabino
2010-11-01
The main aim of this study was to verify the efficacy of using an innovative criteria weighting tool (the "priority scale") for stakeholders involvement to rank a list of suitable municipal solid waste (MSW) facility sites with the multi-criteria decision-making (MCDM) technique known as analytic hierarchy process (AHP). One of the main objectives of the study was to verify the behaviour of the "priority scale" with both technical and non-technical decision-makers. All over the world, the siting of MSW treatment or disposal plants is a complex process involving politicians, technicians as well as citizens, where stakeholders who are not effectively involved strongly oppose (or even obstruct) the realization of new facilities. In this study, in order to pursue both the technical (select the best site) and social aims (all the stakeholders have to give their aware contribution), the use of the "priority scale" is suggested as a tool to easily collect non-contradictory criteria preferences by the various decision-makers. Every decision-maker filled in "priority scale", which was subsequently uploaded in the AHP tool in order to indirectly calculate the individual priority of alternatives given by each stakeholder (not using group aggregation techniques). The proposed method was applied to the siting of a composting plant in an area suffering from a serious MSW emergency, which has lasted for over 15 years, in the Campania Region, in Southern Italy. The best site (the "first choice") was taken as the one that appeared the most times at the first place of each decision-maker ranking list. The involved technical and non-technical decision-makers showed the same behaviour in (indirectly) selecting the best site as well as in terms of the most appraised criteria ("absence of areas of the highest value for natural habitats and species of plants and animals"). Moreover, they showed the same AHP inconsistency ratio as well as the same behaviour in comparison with a "balanced decision-maker" (who assigns identical weights to all the considered criteria). Therefore, the proposed criteria weighting tool could be widely as well as easily used for stakeholders involvement to rank MSW facility sites (or other kinds of alternatives) with the AHP or with other MCDM techniques, taking or not into consideration group aggregation methods. Copyright © 2010 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1992-01-01
The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of seniormore » YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
... supporting technical analyses, can be found on the EPA's Internet Web site at http://www.epa.gov... you for clarification due to technical difficulties, the EPA may not be able to consider your input... possible in supporting your views. Describe any assumptions and provide any technical information and/or...
The Community/Technical College and Community Economic Development: No Longer a Matter of Choice!
ERIC Educational Resources Information Center
Cline, Larry; Kepner, Jim
The Sumter Office of Economic Development and Central Carolina Technical College (South Carolina) formed a partnership to help increase the technical skills of the local work force. Industry surveys, questionnaires, and on-site visits revealed that employers were discouraged with the inadequate work force pool, and that those coming from secondary…
Systems integration studies for supersonic cruise aircraft
NASA Technical Reports Server (NTRS)
Mascitti, V. R.
1975-01-01
Technical progress in each of the disciplinary research areas affecting the design of supersonic cruise aircraft is discussed. The NASA AST/SCAR Program supported the integration of these technical advances into supersonic cruise aircraft configuration concepts. While the baseline concepts reflect differing design philosophy, all reflect a level of economic performance considerably above the current foreign aircraft as well as the former U.S. SST. Range-payload characteristics of the study configurating show significant improvement, while meeting environmental goals such as takeoff and landing noise and upper atmospheric pollution.
Space shuttle/food system study. Volume 1: Technical volume, oven study
NASA Technical Reports Server (NTRS)
1975-01-01
The baseline space shuttle galley was designed to utilize lightweight rehydratable foods, to be prepared for consumption by rehydration with chilled or hot water. The impact is examined of an extension of food types to include thermostabilized food, at ambient temperature, and frozen foods on the baseline design of the shuttle galley. Weight, volume, and power penalities associated with heating thermostabilized and frozen foods by means of a hot air convection heating system and a conduction heating system are determined along with the impact on crew/galley interface and meal preparation.
AGM-88E Advanced Anti-Radiation Guided Missile (AGM-88E AARGM)
2015-12-01
0.0 0.0 Acq O&M 0.0 0.0 -- 0.0 0.0 0.0 0.0 Total 1528.5 1661.1 N/A 2107.4 1861.4 2026.2 2663.7 1 APB Breach Confidence Level Confidence Level of...normal conditions, encountering average levels of technical, schedule, and programmatic risk and external interference. Based on the rigor in methods...SAR Baseline to Current SAR Baseline (TY $M) Initial PAUC Development Estimate Changes PAUC Production Estimate Econ Qty Sch Eng Est Oth Spt Total
Tactical radar technology study. Volume 1: Executive summary
NASA Astrophysics Data System (ADS)
Rosien, R.; Cardone, L.; Hammers, D.; Klein, A.; Nozawa, E.
1980-03-01
This report presents results of a study to identify new technology required to provide advanced multi-threat performance capabilities in future tactical surveillance radar designs. A baseline design with optional subsystem characteristics has been synthesized to provide both functional and operational survivability in a dynamic and hostile situation postulated for the post 1985 time frame. Comparisons have been made of available technology with that required by the new baseline design to identify new technology requirements. Recommendations are presented for critical new technology programs including estimates of technical risks, costs and required development time.
M-X Environmental Technical Report. Alternative Potential Deployment Areas. Nevada/Utah.
1980-12-22
8217M 2 1 ’.. -1’,53 1:93,74 3.t 11701 199.470 I 2.8 Sorce, Bureau of Ecnomic Allysis, 1979. 15 Table 1.1-9. Per capita income and earnings shares by...been separated into Baseline I and Baseline 2. The first set of projections are essentially an extrapolation of 1967-1978 growth trends in the Nevada...migrants in essentially the same manner as the state as a whole although Arizona and Utah cuntribute in excess of 5 percent of the in-migrants
This report reviews and provides recommendations for a long-term groundwater monitoring network for the Kearsarge Metallurgical Corporation Superfund site (KMC site). The KMC site is a former foundry and metal fabrication facility in Conway, New Hampshire.
19. SITE BUILDING 002 SCANNER BUILDING AIR POLICE ...
19. SITE BUILDING 002 - SCANNER BUILDING - AIR POLICE SITE SECURITY OFFICE WITH "SITE PERIMETER STATUS PANEL" AND REAL TIME VIDEO DISPLAY OUTPUT FROM VIDEO CAMERA SYSTEM AT SECURITY FENCE LOCATIONS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
On-site programmatic attendance to cardiac rehabilitation and the healthy-adherer effect.
Alter, David A; Zagorski, Brandon; Marzolini, Susan; Forhan, Mary; Oh, Paul I
2015-10-01
On-site attendance to prescheduled cardiac rehabilitation visits has been shown to be associated with improved outcomes following cardiac rehabilitation. The extent to which on-site programmatic attendance represents a healthy-adherer effect remains unknown. This retrospective cohort study consisted of 17,000 consecutively referred patients to a cardiac rehabilitation program in Ontario, Canada. On-site attendance at prescheduled visits was our primary exposure variable. The primary outcome was all-cause death or hospitalization at two years following the expected program completion date, irrespective of drop-out. Secondary outcomes included adherence to statins, health-seeking preventative health visits, and changes in clinical risk-profiles. Cox proportional hazards adjusted for baseline sociodemographic, clinical and comorbid characteristics. Among the 12,440 patients who attended at least one prescheduled on-site visit, on-site attendance was inversely correlated with baseline smoking rates and body mass index at program entry. After adjustment for baseline factors, the risk of death or hospitalization progressively fell with incremental increases in on-site attendance (adjusted hazard ratio for each 10% increase in on-site attendance: 0.96; 95% confidence interval: 0.93-0.99, p = 0.007). Such associations were driven predominantly by differences in non-cardiovascular hospitalizations. Incremental increases in on-site attendance were associated with improvements in cardiopulmonary fitness and body mass index (both p < 0.001), better attendance of preventative care physician visits (p < 0.001) and higher medication adherence to statins (p = 0.007). Associations between on-site attendance at cardiac rehabilitation and outcomes may represent a healthy-adherer effect. Future research must evaluate the clinical utility of on-site attendance as a behavioral health-adherence metric for cardiac rehabilitation monitoring and surveillance. © The European Society of Cardiology 2014.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mosey, G.; Van Geet, O.
2010-12-01
This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on the Stringfellow Superfund Site in Riverside, California. The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.13/kWh and incentives offered by Southern California Edison under the California Solar Initiative. According to the assessment, a government-owned, ground-mounted PV system represents a technically and economically feasible option. The report recommends financing options that could assist in themore » implementation of such a system.« less
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Submission, approval, and implementation of a baseline... PROGRAMS AT DOE SITES Procedures § 707.5 Submission, approval, and implementation of a baseline workplace... with the requirements of this part and the guidelines of the Department of Health and Human Services...
Petroglyph National Monument : acoustical monitoring 2010
DOT National Transportation Integrated Search
2013-01-01
During the summer of 2010 (August September), the Volpe Center collected baseline acoustical data at Petroglyph National Monument (PETR) at two sites deployed for approximately 30 days each. The baseline data collected during this period will hel...
Sources of variation in baseline gene expression levels from toxicogenomics study control animals
The use of gene expression profiling in both clinical and laboratory settings would be enhanced by better characterization ofvariance due to individual, environmental, and technical factors. Meta-analysis ofmicroarray data from untreated or vehicle-treated animals within the con...
Electric Propulsion System Modeling for the Proposed Prometheus 1 Mission
NASA Technical Reports Server (NTRS)
Fiehler, Douglas; Dougherty, Ryan; Manzella, David
2005-01-01
The proposed Prometheus 1 spacecraft would utilize nuclear electric propulsion to propel the spacecraft to its ultimate destination where it would perform its primary mission. As part of the Prometheus 1 Phase A studies, system models were developed for each of the spacecraft subsystems that were integrated into one overarching system model. The Electric Propulsion System (EPS) model was developed using data from the Prometheus 1 electric propulsion technology development efforts. This EPS model was then used to provide both performance and mass information to the Prometheus 1 system model for total system trades. Development of the EPS model is described, detailing both the performance calculations as well as its evolution over the course of Phase A through three technical baselines. Model outputs are also presented, detailing the performance of the model and its direct relationship to the Prometheus 1 technology development efforts. These EP system model outputs are also analyzed chronologically showing the response of the model development to the four technical baselines during Prometheus 1 Phase A.
NASA Astrophysics Data System (ADS)
Rodríguez-Escales, Paula; Canelles, Arnau; Sanchez-Vila, Xavier; Folch, Albert; Kurtzman, Daniel; Rossetto, Rudy; Fernández-Escalante, Enrique; Lobo-Ferreira, João-Paulo; Sapiano, Manuel; San-Sebastián, Jon; Schüth, Christoph
2018-06-01
Managed aquifer recharge (MAR) can be affected by many risks. Those risks are related to different technical and non-technical aspects of recharge, like water availability, water quality, legislation, social issues, etc. Many other works have acknowledged risks of this nature theoretically; however, their quantification and definition has not been developed. In this study, the risk definition and quantification has been performed by means of fault trees
and probabilistic risk assessment (PRA). We defined a fault tree with 65 basic events applicable to the operation phase. After that, we have applied this methodology to six different managed aquifer recharge sites located in the Mediterranean Basin (Portugal, Spain, Italy, Malta, and Israel). The probabilities of the basic events were defined by expert criteria, based on the knowledge of the different managers of the facilities. From that, we conclude that in all sites, the perception of the expert criteria of the non-technical aspects were as much or even more important than the technical aspects. Regarding the risk results, we observe that the total risk in three of the six sites was equal to or above 0.90. That would mean that the MAR facilities have a risk of failure equal to or higher than 90 % in the period of 2-6 years. The other three sites presented lower risks (75, 29, and 18 % for Malta, Menashe, and Serchio, respectively).
Reusing Cleaned Up Superfund Sites: Ecological Use Where Waste is Left on Site
The report draws from experiences at completedand current reuse projects, EPA technical guidance, and other sources to describe ecosystem characteristics and remediation approaches that have been used to accommodate ecological usesat Superfund sites wher
Continental hydrology loading observed by VLBI measurements
NASA Astrophysics Data System (ADS)
Eriksson, David; MacMillan, D. S.
2014-07-01
Variations in continental water storage lead to loading deformation of the crust with typical peak-to-peak variations at very long baseline interferometry (VLBI) sites of 3-15 mm in the vertical component and 1-2 mm in the horizontal component. The hydrology signal at VLBI sites has annual and semi-annual components and clear interannual variations. We have calculated the hydrology loading series using mass loading distributions derived from the global land data assimilation system (GLDAS) hydrology model and alternatively from a global grid of equal-area gravity recovery and climate experiment (GRACE) mascons. In the analysis of the two weekly VLBI 24-h R1 and R4 network sessions from 2003 to 2010 the baseline length repeatabilities are reduced in 79 % (80 %) of baselines when GLDAS (GRACE) loading corrections are applied. Site vertical coordinate repeatabilities are reduced in about 80 % of the sites when either GLDAS or GRACE loading is used. In the horizontal components, reduction occurs in 70-80 % of the sites. Estimates of the annual site vertical amplitudes were reduced for 16 out of 18 sites if either loading series was applied. We estimated loading admittance factors for each site and found that the average admittances were 1.01 0.05 for GRACE and 1.39 0.07 for GLDAS. The standard deviations of the GRACE admittances and GLDAS admittances were 0.31 and 0.68, respectively. For sites that have been observed in a set of sufficiently temporally dense daily sessions, the average correlation between VLBI vertical monthly averaged series and GLDAS or GRACE loading series was 0.47 and 0.43, respectively.
Very long baseline interferometry using a radio telescope in Earth orbit
NASA Technical Reports Server (NTRS)
Ulvestad, J. S.; Edwards, C. D.; Linfield, R. P.
1987-01-01
Successful Very Long Baseline Interferometry (VLBI) observations at 2.3 GHz were made using an antenna aboard an Earth-orbiting spacecraft as one of the receiving telescopes. These observations employed the first deployed satellite (TDRSE-E for East) of the NASA Tracking and Data Relay Satellite System (TDRSS). Fringes were found for 3 radio sources on baselines between TDRSE and telescopes in Australia and Japan. The purpose of this experiment and the characteristics of the spacecraft that are related to the VLBI observations are described. The technical obstacles to maintaining phase coherence between the orbiting antenna and the ground stations, as well as the calibration schemes for the communication link between TDRSE and its ground station at White Sands, New Mexico are explored. System coherence results and scientific results for the radio source observations are presented. Using all available calibrations, a coherence of 84% over 700 seconds was achieved for baselines to the orbiting telescope.
Tank waste remediation system functions and requirements document
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carpenter, K.E
1996-10-03
This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technicalmore » Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.« less
Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.
DOT National Transportation Integrated Search
2014-12-01
State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...
Transportation planning effectiveness: twenty case studies
DOT National Transportation Integrated Search
1977-12-31
This document consists of 20 site-specific case studies of urban area experience with the Technical Study Grant Program of the Urban Mass Transportation Administration (UMTA). The objective of the case studies is to determine how the Technical Study ...
Dealing with the Effects of Trauma: A Self-Help Guide
... www. mentalhealth. samhsa. gov Consumer Organization and Networking Technical Assistance Center (CONTAC) P.O. Box 11000 Charleston, ... mhselfhelp. org Web site: www. mhselfhelp. org National Technical Assistance Center (NATC) National Association of State Mental ...
The purpose of this paper is to provide RPMs and others investigating hazardous waste sites a summary of the technical issues that need to be considered when determining if a site (i.e., hazardous waste site/area of concern) has elevated levels of ...
Ground Water Technical Support Center (GWTSC) Annual ...
The Ground Water Technical Support Center (GWTSC) is part of the Ground Water and Ecosystems Restoration Division (GWERD), which is based in the Robert S. Kerr Environmental Research Center in Ada, Oklahoma. The GWERD is a research division of U.S. EPA’s National Risk Management Research Laboratory (NRMRL). The GWTSC is one of an interlinked group of specialized Technical Support Centersthat were established under the Technical Support Project (TSP). The GWTSC provides technical support on issues related to groundwater. Specifically, the GWTSC provides technical support to U.S. EPA and State regulators for issues and problems related to:1. subsurface contamination (contaminants in ground water, soils and sediments),2. cross-media transfer (movement of contaminants from the subsurface to other media such as surface water or air), and3. restoration of impacted ecosystems.The GWTSC works with Remedial Project Managers (RPMs) and other decision makers to solve specific problems at Superfund, RCRA (Resource Conservation and Recovery Act), Brownfields sites, and ecosystem restoration sites. The Ground Water Technical Support Center (GWTSC) is part of the Ground Water and Ecosystems Restoration Division (GWERD), which is based in the Robert S. Kerr Environmental Research Center in Ada, Oklahoma. The GWERD is a research division of U.S. EPA’s National Risk Management Research Laboratory (NRMRL). The GWTSC is one of an interlinked group of specialized Technical Suppo
Petroglyph National Monument : acoustical monitoring 2010 and 2012
DOT National Transportation Integrated Search
2014-03-01
During the summer of 2010 (August September) and winter of 2012 (February April), baseline acoustical data were collected at Petroglyph National Monument (PETR) at two sites deployed for approximately 30 days each. The baseline data collected...
Tuzigoot National Monument: Acoustical Monitoring 2010
DOT National Transportation Integrated Search
2013-05-01
During the summer of 2010 (July-August), the Volpe Center collected baseline acoustical data at Tuzigoot National Monument (TUZI) at a site deployed for approximately 30 days. The baseline data collected during this period will help park managers and...
Pecos National Historic Park : acoustical monitoring 2010
DOT National Transportation Integrated Search
2013-03-01
During the summer of 2010 (August September), the Volpe Center collected baseline acoustical data at Pecos National Historical Park (PECO) at four sites deployed for approximately 30 days each. The baseline data collected during this period will ...
Wright Brothers National Memorial : acoustical monitoring 2011
DOT National Transportation Integrated Search
2014-11-01
During the winter of 2011(September - November) baseline acoustical data were collected at Wright Brothers National Memorial (WRBR) at two sites deployed for approximately 30 days each. The baseline data collected during these periods will help park ...
NASA Technical Reports Server (NTRS)
Mitrovica, J. X.; Davis, J. L.; Shapiro, I. I.
1993-01-01
We predict the present-day rates of change of the lengths of 19 North American baselines due to the glacial isostatic adjustment process. Contrary to previously published research, we find that the three-dimensional motion of each of the sites defining a baseline, rather than only the radial motions of these sites, needs to be considered to obtain an accurate estimate of the rate of change of the baseline length. Predictions are generated using a suite of Earth models and late Pleistocene ice histories; these include specific combinations of the two which have been proposed in the literature as satisfying a variety of rebound related geophysical observations from the North American region. A number of these published models are shown to predict rates which differ significantly from the Very Long Base Interferometry (VLBI) observations.
NASA Technical Reports Server (NTRS)
Allenby, R. J.
1979-01-01
Very Long Baseline Interferometry experiments over the last 1-3/4 years between Owens Valley, CA and Haystack, MA Radio Observatories suggest an upper limit of east-west crustal deformation between the two sites of about 1 cm/yr. In view of the fact that the baseline between the two sites traverses most of the major geological provinces of the United States, this low rate of crustal deformation has direct relevance to intra-plate crustal tectonics. The most active region traversed by this baseline is the Basin and Range province, which was estimated by various researchers to be expanding in an east-west direction at rates of .3 to 1.5 cm/yr. The Colorado Plateau and Rocky Mountain system also appear to be expanding, but at a somewhat lower rate, while east of the Rocky Mountains, the predominant stress appears to be compressional, nearly horizontal, and east to northeast trending.
Barringer, Julia L.; Szabo, Zoltan; Reilly, Pamela A.
2012-01-01
Mercury in soils, surface water, and groundwater at the William J. Hughes Technical Center , Atlantic County, New Jersey, has been found at levels that exceed established background concentrations in Coastal Plain waters, and, in some cases, New Jersey State standards for mercury in various media. As of 2012, it is not known whether this mercury is part of regional mercury contamination or whether it is related to former military activities. Regionally, groundwater supplying about 700 domestic wells in the New Jersey Coastal Plain is contaminated with mercury that appears to be derived from anthropogenic inputs, such as agricultural pesticide use and atmospheric deposition. High levels of mercury occasionally are found in Coastal Plain soils, but disturbance during residential development on former agricultural land is thought to have mobilized any mercury applied during farming, a hypothesis borne out by experiments leaching mercury from soils. In the unsewered residential areas with mercury-contaminated groundwater, septic-system effluent is believed to create reducing conditions in which mercury sorbed to subsoils is mobilized to groundwater. In comparing the levels of mercury found in soils, sediments, streamwater, and groundwater at the William J. Hughes Technical Center site with those found regionally, mercury concentrations in groundwater in the region are, in some cases, substantially higher than those found in groundwater at the William J. Hughes Technical Center site. Nevertheless, concentrations of mercury in streamwater at the site are, in some instances, higher than most found regionally. The mercury contents in soils and sediment at the William J. Hughes Technical Center site are substantially higher than those found to date (2012) in the region, indicating that a source other than regional sources may be present at the site.
Crustal dynamics project data analysis, 1986. Volume 1: Fixed station VLBI geodetic results
NASA Technical Reports Server (NTRS)
Ma, C.; Ryan, J. W.
1987-01-01
The Goddard VLBI group reports the results of analyzing 361 Mark III VLBI data sets from fixed observatories through the end of 1985 which are available to the Crustal Dynamics Project. All POLARIS/IRIS full-day data sets are included. The mobile VLBI sites at Platteville, Colorado; Penticton, British Columbia; and Yellowknife, Northwest Territories are also included since these occupations bear on the study of plate stability. Two large solutions, GLB027 and GLB028, were used to obtain site/baseline evolutions and earth rotation parameters, respectively. Source positions and nutation offsets were also adjusted in each solution. The results include 23 sites and 101 baselines.
EPA's Office of Research and Development is responsible to EPA's Office of Solid Waste to provide research and technical support for waste site closures and the development of technical guidance in support of environmental regulations and programmatic policies. ORD is also respo...
Sustainability in the AAP Bronchiolitis Quality Improvement Project.
Shadman, Kristin A; Ralston, Shawn L; Garber, Matthew D; Eickhoff, Jens; Mussman, Grant M; Walley, Susan C; Rice-Conboy, Elizabeth; Coller, Ryan J
2017-11-01
Adherence to American Academy of Pediatrics (AAP) bronchiolitis clinical practice guideline recommendations improved significantly through the AAP's multiinstitutional collaborative, the Bronchiolitis Quality Improvement Project (BQIP). We assessed sustainability of improvements at participating institutions for 1 year following completion of the collaborative. Twenty-one multidisciplinary hospital-based teams provided monthly data for key inpatient bronchiolitis measures during baseline and intervention bronchiolitis seasons. Nine sites provided data in the season following completion of the collaborative. Encounters included children younger than 24 months who were hospitalized for bronchiolitis without comorbid chronic illness, prematurity, or intensive care. Changes between baseline-, intervention-, and sustainability-season data were assessed using generalized linear mixed-effects models with site-specific random effects. Differences between hospital characteristics, baseline performance, and initial improvement between sites that did and did not participate in the sustainability season were compared. A total of 2275 discharges were reviewed, comprising 995 baseline, 877 intervention, and 403 sustainability- season encounters. Improvements in all key bronchiolitis quality measures achieved during the intervention season were maintained during the sustainability season, and orders for intermittent pulse oximetry increased from 40.6% (95% confidence interval [CI], 22.8-61.1) to 79.2% (95% CI, 58.0- 91.3). Sites that did and did not participate in the sustainability season had similar characteristics. BQIP participating sites maintained improvements in key bronchiolitis quality measures for 1 year following the project's completion. This approach, which provided an evidence-based best-practice toolkit while building the quality-improvement capacity of local interdisciplinary teams, may support performance gains that persist beyond the active phase of the collaborative. © 2017 Society of Hospital Medicine
Upadhaya, Nawaraj; Jordans, Mark J D; Abdulmalik, Jibril; Ahuja, Shalini; Alem, Atalay; Hanlon, Charlotte; Kigozi, Fred; Kizza, Dorothy; Lund, Crick; Semrau, Maya; Shidhaye, Rahul; Thornicroft, Graham; Komproe, Ivan H; Gureje, Oye
2016-01-01
Research on information systems for mental health in low and middle income countries (LMICs) is scarce. As a result, there is a lack of reliable information on mental health service needs, treatment coverage and the quality of services provided. With the aim of informing the development and implementation of a mental health information sub-system that includes reliable and measurable indicators on mental health within the Health Management Information Systems (HMIS), a cross-country situation analysis of HMIS was conducted in six LMICs (Ethiopia, India, Nepal, Nigeria, South Africa and Uganda), participating in the 'Emerging mental health systems in low and middle income countries' (Emerald) research programme. A situation analysis tool was developed to obtain and chart information from documents in the public domain. In circumstances when information was inadequate, key government officials were contacted to verify the data collected. In this paper we compare the baseline policy context, human resources situation as well as the processes and mechanisms of collecting, verifying, reporting and disseminating mental health related HMIS data. The findings suggest that countries face substantial policy, human resource and health governance challenges for mental health HMIS, many of which are common across sites. In particular, the specific policies and plans for the governance and implementation of mental health data collection, reporting and dissemination are absent. Across sites there is inadequate infrastructure, few HMIS experts, and inadequate technical support and supervision to junior staff, particularly in the area of mental health. Nonetheless there are also strengths in existing HMIS where a few mental health morbidity, mortality, and system level indicators are collected and reported. Our study indicates the need for greater technical and resources input to strengthen routine HMIS and develop standardized HMIS indicators for mental health, focusing in particular on indicators of coverage and quality to facilitate the implementation of the WHO mental health action plan 2013-2020.
SOURCES OF VARIABILITY IN BASELINE GENE EXPRESSION IN RAT LIVER AND KIDNEY
Toxicogenomic studies are typically variable in design, but the impact of variations in study design and conduct on control animal gene expression has not been well characterized. A working group of the Health and Environmental Sciences Institute (HESI) Technical Committee on the...
Grierson, Lawrence; Melnyk, Megan; Jowlett, Nathan; Backstein, David; Dubrowski, Adam
2011-01-01
Skills training in simulation laboratories is becoming increasingly common. However, the educational benefit of these laboratories remains unclear. This study examined whether such training enables better performance on the simultaneous execution of technical skill and knowledge retention. Twenty-four novice trainees completed the elliptical excision on baseline testing. Following baseline testing twelve of the novices completed a technical practice (simulation training group) session, while the other twelve did not (control group). One week later, all participants returned for dual-task follow up testing in which they performed the excision while listening to a didactic lesson on the staging and treatment of cutaneous melanoma. The dual-tasking during the post test was standardized, whereby excision sutures 3 and 5 were performed alone (single), and sutures 4 and 6 were performed concurrently with the didactic lecture (dual). Seven additional trainees also participated as controls that were randomized to listen to the didactic lesson alone (knowledge retention alone group). Knowledge retention was assessed by a multiple choice questionnaire (MCQ). Technical performance was evaluated with computer and expert-based measures. Time to complete the performance improved among both groups completing the elliptical excision on follow-up testing (p<0.01). The simulation training group demonstrated superior hand motion performance on simultaneous didactic lesson testing (p<0.01). Novices from the no-training group performed statistically worse while suturing concurrently with the didactic lesson (p<0.01). The pretraining of novices in surgical skills laboratories leads to improved technical performance during periods of increased attention demands.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marquis Childs
1999-09-01
Material Disposal Area G (Area G) is at Technical Area 54 at Los Alamos National Laboratory (LANL). Area G has been the principal facility for the disposal of low-level, solid-mixed, and transuranic waste since 1957. It is currently LANL's primary facility for radioactive solid waste burial and storage. As part of the annual environmental surveillance effort at Area G, surface soil samples are collected around the facility's perimeter to characterize possible radionuclide movement off the site through surface water runoff During 1998, 39 soil samples were collected and analyzed for percent moisture, tritium, plutonium-238 and 239, cesium-137 and americium-241. Tomore » assess radionuclide concentrations, the results from these samples are compared with baseline or background soil samples collected in an undisturbed area west of the active portion Area G. The 1998 results are also compared to the results from analogous samples collected during 1996 and 1997 to assess changes over this time in radionuclide activity concentrations in surface soils around the perimeter of Area G. The results indicate elevated levels of all the radionuclides assessed (except cesium-137) exist in Area G perimeter surface soils vs the baseline soils. The comparison of 1998 soil data to previous years (1996 and 1997) indicates no significant increase or decrease in radionuclide concentrations; an upward or downward trend in concentrations is not detectable at this time. These results are consistent with data comparisons done in previous years. Continued annual soil sampling will be necessary to realize a trend if one exists. The radionuclide levels found in the perimeter surface soils are above background but still considered relatively low. This perimeter surface soil data will be used for planning purposes at Area G, techniques to prevent sediment tm.nsport off-site are implemented in the areas where the highest radionuclide concentrations are indicated.« less
Technical Support Project for Cleaning Up Contaminated Sites - Expertise Directory
This directory is searchable and provides a snapshot of the various types of expertise possessed by the current members of the three Technical Support Project forums. It is based on input provided by the members themselves.
TECHNICAL RESOURCE DOCUMENT ON MONITORED NATURAL RECOVERY
In 2005, the United States Environmental Protection Agency (EPA) published a document entitled Contaminated Sediment Remediation Guidance for Hazardous Waste Sites (EPA, 2005), which provides technical and policy guidance for project managers and teams making risk manageme...
Back pain in seniors: the Back pain Outcomes using Longitudinal Data (BOLD) cohort baseline data.
Jarvik, Jeffrey G; Comstock, Bryan A; Heagerty, Patrick J; Turner, Judith A; Sullivan, Sean D; Shi, Xu; Nerenz, David R; Nedeljkovic, Srdjan S; Kessler, Larry; James, Kathryn; Friedly, Janna L; Bresnahan, Brian W; Bauer, Zoya; Avins, Andrew L; Deyo, Richard A
2014-04-23
Back pain represents a substantial burden globally, ranking first in a recent assessment among causes of years lived with disability. Though back pain is widely studied among working age adults, there are gaps with respect to basic descriptive epidemiology among seniors, especially in the United States. Our goal was to describe how pain, function and health-related quality of life vary by demographic and geographic factors among seniors presenting to primary care providers with new episodes of care for back pain. We examined baseline data from the Back pain Outcomes using Longitudinal Data (BOLD) registry, the largest inception cohort to date of seniors presenting to a primary care provider for back pain. The sample included 5,239 patients ≥ 65 years old with a new primary care visit for back pain at three integrated health systems (Northern California Kaiser-Permanente, Henry Ford Health System [Detroit], and Harvard Vanguard Medical Associates [Boston]). We examined differences in patient characteristics across healthcare sites and associations of patient sociodemographic and clinical characteristics with baseline patient-reported measures of pain, function, and health-related quality of life. Patients differed across sites in demographic and other characteristics. The Detroit site had more African-American patients (50%) compared with the other sites (7-8%). The Boston site had more college graduates (68%) compared with Detroit (20%). Female sex, lower educational status, African-American race, and older age were associated with worse functional disability as measured by the Roland-Morris Disability Questionnaire. Except for age, these factors were also associated with worse pain. Baseline pain and functional impairment varied substantially with a number of factors in the BOLD cohort. Healthcare site was an important factor. After controlling for healthcare site, lower education, female sex, African-American race, and older age were associated with worse physical disability and all of these factors except age were associated with worse pain. Clinical Trials.gov NCT01776242; Registration date: June 13, 2012.
1991-05-01
or may not bypass the editing function. At present, editing rules beyond those required for translation have not been stipulated. 2When explicit... editing rules become defined, the editor at a site LGN may perform two levels of edit checking: warning, which would insert blanks or pass as submitted...position image transactions into a transaction set. This low-level edit checking is performed at the site LGN to reduce transmission costs and to
NASA Astrophysics Data System (ADS)
Bressler, R. D.
1981-11-01
This quarterly technical report describes work on the development of and experimentation with packet broadcast by satellite; on development of Pluribus Satellite IMPs; on a study of the technology of Remote Site Maintenance; on Internetwork monitoring; on shipboard satellite communications; and on the development of Transmission Control Protocols for the HP3000, TAC, and VAX-UNIX.
Nuclear facility decommissioning and site remedial actions: A selected bibliography: Volume 8
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owen, P.T.; Michelson, D.C.; Knox, N.P.
1987-09-01
The 553 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eighth in a series of reports. Foreign and domestic literature of all types - technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions - has been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of energy's remedial action program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Facilities Contaminated with Naturally Occurring Radionuclides, Uranium Mill Tailings Remedial Action Program,more » Uranium Mill Tailings Management, Technical Measurements Center, and General Remedial Action Program Studies. Chapter sections for chapters 1, 2, 5, and 6 include Design, Planning, and Regulations; Environmental Studies and Site Surveys; Health, Safety, and Biomedical Studies; Decontamination Studies; Dismantlement and Demolition; Site Stabilization and Reclamation; Waste Disposal; Remedial Action Experience; and General Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, and keywords. The appendix contains a list of frequently used acronyms and abbreviations.« less
Radioactive Liquid Waste Treatment Facility: Environmental Information Document
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haagenstad, H.T.; Gonzales, G.; Suazo, I.L.
1993-11-01
At Los Alamos National Laboratory (LANL), the treatment of radioactive liquid waste is an integral function of the LANL mission: to assure U.S. military deterrence capability through nuclear weapons technology. As part of this mission, LANL conducts nuclear materials research and development (R&D) activities. These activities generate radioactive liquid waste that must be handled in a manner to ensure protection of workers, the public, and the environment. Radioactive liquid waste currently generated at LANL is treated at the Radioactive Liquid Waste Treatment Facility (RLWTF), located at Technical Area (TA)-50. The RLWTF is 30 years old and nearing the end ofmore » its useful design life. The facility was designed at a time when environmental requirements, as well as more effective treatment technologies, were not inherent in engineering design criteria. The evolution of engineering design criteria has resulted in the older technology becoming less effective in treating radioactive liquid wastestreams in accordance with current National Pollutant Discharge Elimination System (NPDES) and Department of Energy (DOE) regulatory requirements. Therefore, to support ongoing R&D programs pertinent to its mission, LANL is in need of capabilities to efficiently treat radioactive liquid waste onsite or to transport the waste off site for treatment and/or disposal. The purpose of the EID is to provide the technical baseline information for subsequent preparation of an Environmental Impact Statement (EIS) for the RLWTF. This EID addresses the proposed action and alternatives for meeting the purpose and need for agency action.« less
Predicting child maltreatment among Puerto Rican children from migrant and non-migrant families
Sledjeski, Eve M.; Dierker, Lisa C.; Bird, Hector R.; Canino, Glorisa
2009-01-01
Objective The objectives of the present study were to 1) describe the prevalence of child maltreatment among migrant and non-migrant Puerto Rican families and 2) identify socio-demographic and cultural (i.e. acculturation pattern, familismo) predictors of maltreatment within these two samples. Method Representative community samples of Puerto Rican children (ages 5-13 at baseline) and their adult caretakers were interviewed at two sites: the South Bronx in New York City (n=631 families) and the Standard Metropolitan Areas of San Juan and Caguas in Puerto Rico (n=859 families). Participants were re-interviewed one and two years following the baseline assessment. Results While prevalence rates of maltreatment (physical abuse, 10%; sexual abuse 1 %; neglect, 10%; and multi-type, 6%) did not differ between the two sites at baseline assessment, site differences emerged over time. Rates of physical abuse at follow-up were significantly higher in the Bronx compared to Puerto Rico. Further, for families living in the Bronx, living in poverty predicted chronic maltreatment, whereas living above the poverty line predicted new cases of maltreatment at follow-up. For families living in Puerto Rico, those who experienced physical abuse or multi-type maltreatment at baseline were more likely to report chronic maltreatment at follow-up regardless of poverty level. Cultural factors were not related to baseline or follow-up maltreatment at either site. Conclusion Findings suggest that while rates of child maltreatment may be similar in migrant and non-migrant Puerto Rican families and when compared to prevalence rates in the US, predictors of maltreatment may differ. Practice Implications Since predictors of maltreatment may vary across population subgroups, studying homogenous samples will lead to more effective and targeted interventions. PMID:19457554
Sunset Crater Volcano National Monument : Acoustical Monitoring 2010
DOT National Transportation Integrated Search
2013-05-01
During the summer of 2010 (July - August), the Volpe Center collected baseline acoustical data at Sunset Crater Volcano National Monument (SUCR) at a site deployed for approximately 30 days. The baseline data collected during this period will help pa...
Kings Mountain National Military Park : acoustical monitoring 2012
DOT National Transportation Integrated Search
2014-11-01
During the winter of 2012(November-December) baseline acoustical data were collected at Kings Mountain National Military Park (KIMO)at two sites deployed for approximately 30 days each. The baseline data collected during these periods will help park ...
Cape Hatteras National Seashore acoustical monitoring 2008 and 2011
DOT National Transportation Integrated Search
2014-11-01
During the summer of 2008(May) and winter of 2011 (September-November) baseline acoustical data were collected at Cape Hatteras National Seashore at three sites deployed for approximately 30 days each. The baseline data collected during these periods...
Walnut Canyon National Monument : Acoustical Monitoring 2010
DOT National Transportation Integrated Search
2013-06-01
During the summer of 2010 (July - August), the Volpe Center collected baseline acoustical data at Walnut Canyon National Monument (WACA) at a site deployed for approximately 30 days. The baseline data collected during this period will help park manag...
Big Bend National Park: Acoustical Monitoring 2010
DOT National Transportation Integrated Search
2013-06-01
During the summer of 2010 (September October 2010), the Volpe Center collected baseline acoustical data at Big Bend National Park (BIBE) at four sites deployed for approximately 30 days each. The baseline data collected during this period will he...
Montezuma Castle National Monument : acoustical monitoring 2010
DOT National Transportation Integrated Search
2013-03-01
During the summer of 2010 (July-August), the Volpe Center collected baseline acoustical data at Montezuma Castle National Monument (MOCA) at two sites deployed for approximately 30 days each. The baseline data collected during this period will help p...
Tuzigoot National Monument : acoustical monitoring 2010 and 2012
DOT National Transportation Integrated Search
2014-03-01
During the summer of 2010 (July - August) and winter of 2012 (March-April) baseline acoustical data were collected at Tuzigoot National Monument (TUZI) at a site deployed for approximately 30 days during each period. The baseline data collected durin...
10 CFR 960.5-2 - Technical guidelines.
Code of Federal Regulations, 2014 CFR
2014-01-01
..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...
10 CFR 960.5-2 - Technical guidelines.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...
10 CFR 960.5-2 - Technical guidelines.
Code of Federal Regulations, 2013 CFR
2013-01-01
..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...
10 CFR 960.5-2 - Technical guidelines.
Code of Federal Regulations, 2012 CFR
2012-01-01
..., operation, and closure. The first group includes conditions on population density and distribution, site... the surface characteristics of the site, the characteristics of the host rock and surrounding strata...
The guidance document gives assistance to communities, decision-makers, states and municipalities, academia, and the private sector to address issues related to the redevelopment of Brownfields sites, specifically, municipal landfill and illegal dump sites. The document helps use...
Acquisition of background and technical information and class trip planning
NASA Technical Reports Server (NTRS)
Mackinnon, R. M.; Wake, W. H.
1981-01-01
Instructors who are very familiar with a study area, as well as those who are not, find the field trip information acquisition and planning process speeded and made more effective by organizing it in stages. The stage follow a deductive progression: from the associated context region, to the study area, to the specific sample window sites, and from generalized background information on the study region to specific technical data on the environmental and human use systems to be interpreted at each site. On the class trip and in the follow up laboratory, the learning/interpretive process are at first deductive in applying previously learned information and skills to analysis of the study site, then inductive in reading and interpreting the landscape, imagery, and maps of the site, correlating them with information of other samples sites and building valid generalizations about the larger study area, its context region, and other (similar and/or contrasting) regions.
10 CFR 960.3-2-1 - Site screening for potentially acceptable sites.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Section 960.3-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-1 Site screening for... technical guidelines can exist in the same land unit, the DOE shall seek to evaluate the composite...
10 CFR 960.3-2-1 - Site screening for potentially acceptable sites.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Section 960.3-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-1 Site screening for... technical guidelines can exist in the same land unit, the DOE shall seek to evaluate the composite...
10 CFR 960.3-2-1 - Site screening for potentially acceptable sites.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Section 960.3-2-1 Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-1 Site screening for... technical guidelines can exist in the same land unit, the DOE shall seek to evaluate the composite...
Globalization amid the Cornfields: Teaching Sustainable Practices in the American Midwest
ERIC Educational Resources Information Center
Writing Instructor, 2010
2010-01-01
This article discusses three sites that disrupt accustomed expectations and roles for technical communication. These sites include an agricultural processing site that is requesting tax abatements in exchange for decreased emissions so that it can remain competitive in the global market. The second is also an agricultural manufacturing site that…
Crustal dynamics project session 4 validation and intercomparison experiments 1979-1980 report
NASA Technical Reports Server (NTRS)
Liebrecht, P.; Kolenkiewicz, R.; Ryan, J.; Hothem, L.
1983-01-01
As part of the Crustal Dynamics Project, an experiment was performed to verify the ability of Satellite Laser Ranging (SLR), Very Long Baseline interferometry (VLBI) and Doppler Satellite Positioning System (Doppler) techniques to estimate the baseline distances between several locations. The Goddard Space Flight Center (GSFC) lasers were in operation at all five sites available to them. The ten baselines involved were analyzed using monthly orbits and various methods of selecting data. The standard deviation of the monthly SLR baseline lengths was at the 7 cm level. The GSFC VLBI (Mark III) data was obtained during three separate experiments. November 1979 at Haystack and Owens Valley, and April and July 1980 at Haystack, Owens Valley, and Fort Davis. Repeatability of the VLBI in determining baseline lengths was calculated to be at the 2 cm level. Jet Propulsion Laboratory (JPL) VLBI (Mark II) data was acquired on the Owens Valley to Goldstone baseline on ten occasions between August 1979 and November 1980. The repeatability of these baseline length determinations was calculated to be at the 5 cm level. National Geodetic Survey (NGS) Doppler data was acquired at all five sites in January 1980. Repeatability of the Doppler determined baseline lengths results were calculated at approximately 30 cm. An intercomparison between baseline distances and associated parameters was made utilizing SLR, VLBI, and Doppler results on all available baselines. The VLBI and SLR length determinations were compared on four baselines with a resultant mean difference of -1 cm and a maximum difference of 12 cm. The SLR and Doppler length determinations were compared on ten baselines with a resultant mean difference of about 30 cm and a maximum difference of about 60 cm. The VLBI and Doppler lengths from seven baselines showed a resultant mean difference of about 30 cm and maximum difference of about 1 meter. The intercomparison of baseline orientation parameters were consistent with past analysis.
11. SITE BUILDING 002 SCANNER BUILDING EVAPORATIVE COOLING ...
11. SITE BUILDING 002 - SCANNER BUILDING - EVAPORATIVE COOLING TOWER SYSTEM IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
Precision Geodesy via Radio Interferometry.
Hinteregger, H F; Shapiro, I I; Robertson, D S; Knight, C A; Ergas, R A; Whitney, A R; Rogers, A E; Moran, J M; Clark, T A; Burke, B F
1972-10-27
Very-long-baseline interferometry experiments, involving observations of extragalactic radio sources, were performed in 1969 to determine the vector separations between antenna sites in Massachusetts and West Virginia. The 845.130-kilometer baseline was estimated from two separate experiments. The results agreed with each other to within 2 meters in all three components and with a special geodetic survey to within 2 meters in length; the differences in baseline direction as determined by the survey and by interferometry corresponded to discrepancies of about 5 meters. The experiments also yielded positions for nine extragalactic radio sources, most to within 1 arc second, and allowed the hydrogen maser clocks at the two sites to be synchronized a posteriori with an uncertainty of only a few nanoseconds.
Automotive Stirling Engine Development Program
NASA Technical Reports Server (NTRS)
Allen, M. (Editor)
1980-01-01
Progress is reported in the following: the Stirling reference engine system design; components and subsystems; F-40 baseline Stirling engine installation and test; the first automotive engine to be built on the program; computer development activities; and technical assistance to the Government. The overall program philosophy is outlined, and data and results are given.
Space Geodesy Project Information and Configuration Management Procedure
NASA Technical Reports Server (NTRS)
Merkowitz, Stephen M.
2016-01-01
This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
..., 2011, HUD posted on http://www.Grants.gov , a Notice of Public Interest (NOPI) for Fiscal Year 2010... posted to http://www.Grants.gov a technical correction to that notice. The technical correction adds an... Development agency link on the Grants.gov/Find Web site at http://www.grants.gov/search/agency.do . A link to...
ERIC Educational Resources Information Center
Wichowski, Chester P.; Nunez, Frances
2005-01-01
A survey was conducted among a population of 350 Career and Technical Education, CTE, teachers from 12 Career Technical Education Centers, CTC, sites in seven counties throughout Pennsylvania (return rate = 64%). The participating schools demographic settings, which were selected by the respondents, were closely divided between rural (37.9%) and…
Site characterization report for the basalt waste isolation project. Volume II
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1982-11-01
The reference location for a repository in basalt for the terminal storage of nuclear wastes on the Hanford Site and the candidate horizons within this reference repository location have been identified and the preliminary characterization work in support of the site screening process has been completed. Fifteen technical questions regarding the qualification of the site were identified to be addressed during the detailed site characterization phase of the US Department of Energy-National Waste Terminal Storage Program site selection process. Resolution of these questions will be provided in the final site characterization progress report, currently planned to be issued in 1987,more » and in the safety analysis report to be submitted with the License Application. The additional information needed to resolve these questions and the plans for obtaining the information have been identified. This Site Characterization Report documents the results of the site screening process, the preliminary site characterization data, the technical issues that need to be addressed, and the plans for resolving these issues. Volume 2 contains chapters 6 through 12: geochemistry; surface hydrology; climatology, meteorology, and air quality; environmental, land-use, and socioeconomic characteristics; repository design; waste package; and performance assessment.« less
Montezuma Castle National Monument : acoustical monitoring 2010 and 2012
DOT National Transportation Integrated Search
2014-03-01
During the summer of 2010 (July-August)and winter of 2012 (March-May) baseline acoustical data were collected at Montezuma Castle National Monument (MOCA), at two sites deployed for approximately 30 days each. The baseline data collected during these...
Casa Grande Ruins National Monument acoustical monitoring 2010
DOT National Transportation Integrated Search
2014-11-01
During September 2010, The Volpe Center collected baseline acoustical data at Casa Grande National Monument (CAGR), at one site for 28 days. The baseline data collected during this period will help park managers and planners estimate the effects of f...
Rio Grande Wild and Scenic River : Acoustical Monitoring 2010
DOT National Transportation Integrated Search
2013-06-01
During the summer of 2010 (September October 2010), the Volpe Center collected baseline acoustical data at Rio Grande Wild and Scenic River (RIGR) at three sites deployed for approximately 30 days each. The baseline data collected during this per...
1993 UPDATE OF THE U.S. ENVIRONMENTAL PROTECTION AGENCY'S SITE EMERGING TECHNOLOGY PROGRAM
The Emerging Technology Program (ETP), part of the U.S. EPA`s Superfund Innovative Technology Evaluation (SITE) Program, is continuing to create an environment where technical innovation can accelerate into field and commercial applications for treatment of hazardous waste sites....
TECHNICAL APPROACHES TO CHARACTERIZING AND CLEANING UP BROWNFIELDS SITES: PULP AND PAPER MILLS
This guidance document gives assistance to communities, decision-makers, states and municipalities, academia, and the private sector to address issues related to the redevelopment of Brownfields sites, specifically pulp and paper mills sites. The document helps users to understan...
Pulp fiction - The volunteer concept (or how not to site additional LLRW disposal capacity)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burton, D.A.
1995-12-31
Experiences of compacts and of individual states throughout the nation indicate that low-level radioactive waste disposal siting processes, based from the beginning upon the volunteer concept are fraught with problems. Most apparent among these problems is that the volunteer concept does not lead to scientifically and technically based siting endeavors. Ten years have passed since the Amendments Act of 1985, and no compact or state has been - successful in providing for new LLRW disposal capacity. That failure can be traced in part to the reliance upon the volunteer concept in siting attempts. If success is to be achieved, themore » future direction for LLRW management must focus on three areas: first, a comprehensive evaluation of all LLRW management options, including reduction of waste generated and on-site storage; secondly, a comprehensive evaluation of the current as well as projected waste stream, to determine the amount of disposal capacity actually needed; and, finally, sound scientifically and technically based siting processes.« less
Huisman, Merel; Lam, Mie K; Bartels, Lambertus W; Nijenhuis, Robbert J; Moonen, Chrit T; Knuttel, Floor M; Verkooijen, Helena M; van Vulpen, Marco; van den Bosch, Maurice A
2014-01-01
Magnetic resonance-guided high intensity focused ultrasound (MR-HIFU) has recently emerged as an effective treatment option for painful bone metastases. We describe here the first experience with volumetric MR-HIFU for palliative treatment of painful bone metastases and evaluate the technique on three levels: technical feasibility, safety, and initial effectiveness. In this observational cohort study, 11 consecutive patients (7 male and 4 female; median age, 60 years; age range, 53-86 years) underwent 13 treatments for 12 bone metastases. All patients exhibited persistent metastatic bone pain refractory to the standard of care. Patients were asked to rate their worst pain on an 11-point pain scale before treatment, 3 days after treatment, and 1 month after treatment. Complications were monitored. All data were prospectively recorded in the context of routine clinical care. Response was defined as a ≥2-point decrease in pain at the treated site without increase in analgesic intake. Baseline pain scores were compared to pain scores at 3 days and 1 month using the Wilcoxon signed-rank test. For reporting, the STROBE guidelines were followed. No treatment-related major adverse events were observed. At 3 days after volumetric MR-HIFU ablation, pain scores decreased significantly (p = 0.045) and response was observed in a 6/11 (55%) patients. At 1-month follow-up, which was available for nine patients, pain scores decreased significantly compared to baseline (p = 0.028) and 6/9 patients obtained pain response (overall response rate 67% (95% confidence interval (CI) 35%-88%)). This is the first study reporting on the volumetric MR-HIFU ablation for painful bone metastases. No major treatment-related adverse events were observed during follow-up. The results of our study showed that volumetric MR-HIFU ablation for painful bone metastases is technically feasible and can induce pain relief in patients with metastatic bone pain refractory to the standard of care. Future research should be aimed at standardization of the treatment procedures and treatment of larger numbers of patients to assess treatment effectiveness and comparison to the standard of care.
2014-01-01
Background Magnetic resonance-guided high intensity focused ultrasound (MR-HIFU) has recently emerged as an effective treatment option for painful bone metastases. We describe here the first experience with volumetric MR-HIFU for palliative treatment of painful bone metastases and evaluate the technique on three levels: technical feasibility, safety, and initial effectiveness. Methods In this observational cohort study, 11 consecutive patients (7 male and 4 female; median age, 60 years; age range, 53–86 years) underwent 13 treatments for 12 bone metastases. All patients exhibited persistent metastatic bone pain refractory to the standard of care. Patients were asked to rate their worst pain on an 11-point pain scale before treatment, 3 days after treatment, and 1 month after treatment. Complications were monitored. All data were prospectively recorded in the context of routine clinical care. Response was defined as a ≥2-point decrease in pain at the treated site without increase in analgesic intake. Baseline pain scores were compared to pain scores at 3 days and 1 month using the Wilcoxon signed-rank test. For reporting, the STROBE guidelines were followed. Results No treatment-related major adverse events were observed. At 3 days after volumetric MR-HIFU ablation, pain scores decreased significantly (p = 0.045) and response was observed in a 6/11 (55%) patients. At 1-month follow-up, which was available for nine patients, pain scores decreased significantly compared to baseline (p = 0.028) and 6/9 patients obtained pain response (overall response rate 67% (95% confidence interval (CI) 35%–88%)). Conclusions This is the first study reporting on the volumetric MR-HIFU ablation for painful bone metastases. No major treatment-related adverse events were observed during follow-up. The results of our study showed that volumetric MR-HIFU ablation for painful bone metastases is technically feasible and can induce pain relief in patients with metastatic bone pain refractory to the standard of care. Future research should be aimed at standardization of the treatment procedures and treatment of larger numbers of patients to assess treatment effectiveness and comparison to the standard of care. PMID:25309743
Hand, Maureen; Augustine, Chad; Feldman, David; Kurup, Parthiv; Beiter, Philipp; O'Connor, Patrick
2017-08-21
Each year since 2015, NREL has presented Annual Technology Baseline (ATB) in a spreadsheet that contains detailed cost and performance data (both current and projected) for renewable and conventional technologies. The spreadsheet includes a workbook for each technology. This spreadsheet provides data for the 2017 ATB. In this edition of the ATB, offshore wind power has been updated to include 15 technical resource groups. And, two options are now provided for representing market conditions for project financing, including current market conditions and long-term historical conditions. For more information, see https://atb.nrel.gov/.
Wang, Weitao; Wang, Yinghui; Zhang, Ruijie; Wang, Shaopeng; Wei, Chaoshuai; Chaemfa, Chakra; Li, Jun; Zhang, Gan; Yu, Kefu
2016-01-15
Passive air samplers (PAS) were deployed concurrently at 15 locations (nine urban sites and six rural sites) in Vietnam and exposed for approximately 6 weeks from June 26, 2012 to August 26, 2012 and from December 8, 2012 to February 8, 2013. The concentration, composition and enantiomeric signatures of the target compound and Air Mass Backward Trajectories of the 15 sampling sites are presented and discussed in this study. Relatively clean air mass from ocean and similar concentrations and composition of POPs between the south and north of Vietnam indicate that local emissions is most likely the major source of POPs in Vietnam. Technical DDT and technical HCH were widely used in Vietnam and corresponding quantitative data suggests the sporadic use. The preferential degradation of (+)-α-HCH was found in all sampling sites, which could be a regional characteristic of Vietnam. High trans-/cis-chlordane (TC/CC) ratios indicate the current use of technical chlordane for termite control. PCA estimated that main source of PCBs present in the atmosphere of Vietnam was uncontrolled discarded e-waste. Copyright © 2015 Elsevier B.V. All rights reserved.
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
Site Investigation/Analysis and Risk Characterization (Final) Prepared for Honeywell International Inc. Prepared by CDR Environmental Specialists, Inc. August 2010 Region ID: 04 DocID: 10746263, DocDate: 08-01-2010
Assessment of local GNSS baselines at co-location sites
NASA Astrophysics Data System (ADS)
Herrera Pinzón, Iván; Rothacher, Markus
2018-01-01
As one of the major contributors to the realisation of the International Terrestrial Reference System (ITRS), the Global Navigation Satellite Systems (GNSS) are prone to suffer from irregularities and discontinuities in time series. While often associated with hardware/software changes and the influence of the local environment, these discrepancies constitute a major threat for ITRS realisations. Co-located GNSS at fundamental sites, with two or more available instruments, provide the opportunity to mitigate their influence while improving the accuracy of estimated positions by examining data breaks, local biases, deformations, time-dependent variations and the comparison of GNSS baselines with existing local tie measurements. With the use of co-located GNSS data from a subset sites of the International GNSS Service network, this paper discusses a global multi-year analysis with the aim of delivering homogeneous time series of coordinates to analyse system-specific error sources in the local baselines. Results based on the comparison of different GNSS-based solutions with the local survey ties show discrepancies of up to 10 mm despite GNSS coordinate repeatabilities at the sub-mm level. The discrepancies are especially large for the solutions using the ionosphere-free linear combination and estimating tropospheric zenith delays, thus corresponding to the processing strategy used for global solutions. Snow on the antennas causes further problems and seasonal variations of the station coordinates. These demonstrate the need for a permanent high-quality monitoring of the effects present in the short GNSS baselines at fundamental sites.
Carter, Ebony B; Temming, Lorene A; Fowler, Susan; Eppes, Catherine; Gross, Gilad; Srinivas, Sindhu K; Macones, George A; Colditz, Graham A; Tuuli, Methodius G
2017-10-01
To estimate the association of implementation of evidence-based bundles with surgical site infection rates after cesarean delivery. We searched MEDLINE through PubMed, EMBASE, Scopus, the Cochrane Database of Systematic Reviews, Google Scholar, and ClinicalTrials.gov. We searched electronic databases for randomized controlled trials and observational studies comparing evidence-based infection prevention bundles for cesarean delivery, defined as implementation of three or more processes proven to prevent surgical site infection such as chlorhexidine skin preparation, antibiotic prophylaxis, and hair clipping, with usual care. The primary outcome was overall surgical site infection, defined using Centers for Disease Control and Prevention's National Healthcare Safety Network criteria. Secondary outcomes were superficial or deep surgical site infection and endometritis. Quality of studies and heterogeneity were assessed using validated measures. Pooled relative risks (RRs) with 95% CIs were calculated using random-effects models. Numbers needed to treat were estimated for outcomes with significant reduction. We found no randomized controlled trials. Fourteen preintervention and postintervention studies met inclusion criteria. Eight were full-text articles, and six were published abstracts. Quality of most of the primary studies was adequate with regard to the intervention, but modest in terms of implementation. The rate of surgical site infection was significantly lower after implementing an evidence-based bundle (14 studies: pooled rates 6.2% baseline compared with 2.0% intervention, pooled RR 0.33, 95% CI 0.25-0.43, number needed to treat=24). Evidence-based bundles were also associated with a lower rate of superficial or deep surgical site infection (six studies: pooled rate 5.9% baseline compared with 1.1% intervention, pooled RR 0.19, 95% CI 0.12-0.32, number needed to treat=21). The rate of endometritis was low at baseline and not significantly different after intervention (six studies: pooled rate 1.3% baseline compared with 0.9% intervention, pooled RR 0.57, 95% CI 0.31-1.06). Evidence-based bundles are associated with a significant reduction in surgical site infection after cesarean delivery.
10 CFR 63.114 - Requirements for performance assessment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Technical Criteria Postclosure Performance Assessment § 63..., hydrology, and geochemistry (including disruptive processes and events) of the Yucca Mountain site, and the... disposal, and provide for the technical basis for parameter ranges, probability distributions, or bounding...
10 CFR 63.114 - Requirements for performance assessment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Technical Criteria Postclosure Performance Assessment § 63..., hydrology, and geochemistry (including disruptive processes and events) of the Yucca Mountain site, and the... disposal, and provide for the technical basis for parameter ranges, probability distributions, or bounding...
10 CFR 63.114 - Requirements for performance assessment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Technical Criteria Postclosure Performance Assessment § 63..., hydrology, and geochemistry (including disruptive processes and events) of the Yucca Mountain site, and the... disposal, and provide for the technical basis for parameter ranges, probability distributions, or bounding...
10 CFR 63.114 - Requirements for performance assessment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Technical Criteria Postclosure Performance Assessment § 63..., hydrology, and geochemistry (including disruptive processes and events) of the Yucca Mountain site, and the... disposal, and provide for the technical basis for parameter ranges, probability distributions, or bounding...
10 CFR 63.114 - Requirements for performance assessment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Technical Criteria Postclosure Performance Assessment § 63..., hydrology, and geochemistry (including disruptive processes and events) of the Yucca Mountain site, and the... disposal, and provide for the technical basis for parameter ranges, probability distributions, or bounding...
Hazardous Waste Cleanup: Veolia ES Technical Solutions, L.L.C. in Middlesex, New Jersey
Veolia ES Technical Solutions is located at 125 Factory Lane in Middlesex, New Jersey. Veolia owns and operates a solvent-reprocessing facility that is located on a four-acre site in an industrial area of Middlesex Borough.
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2011 CFR
2011-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
40 CFR 300.810 - Contents of the administrative record file.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determination of imminent and substantial endangerment, public health evaluations, and technical and engineering... and appropriate requirements, guidance on risk/exposure assessments, engineering handbooks, articles from technical journals, memoranda on the application of a specific regulation to a site, and memoranda...
Growth and Migration Plan for Data Insight
2004-12-13
exceed 30 users. The group of users must select one person to be the technical point of contact (TPOC). All technical and business questions shall...CONTACT (TPOC) INFORMATION Name: Title: Site: Address: City: State: Zip Code: E-mail address: Business phone number: Business fax
Baseline Caesium-137 and Plutonium-239+240 inventory assessment for Central Europe
NASA Astrophysics Data System (ADS)
Meusburger, Katrin; Borelli, Pasquale; Evrard, Olivier; Ketterer, Michael; Mabit, Lionel; van Oost, Kristof; Alewell, Christine; Panagos, Panos
2017-04-01
Artificial fallout radionuclides (FRNs) such as Caesium-137 and Plutonium-239+240 released as products of the thermonuclear weapons testing that took place from the mid-1950s to the early 1980s and from nuclear power plant accidents (e.g. Chernobyl) are useful tools to quantify soil redistribution. In combination with geostatistics, FRNs may have the potential to bridge the gap between small scale process oriented studies and modelling that simplifies processes and effects over large spatial scales. An essential requirement for the application of FRNs as soil erosion tracers is the establishment of the baseline fallout at undisturbed sites before its comparison to those inventories found at sites undergoing erosion/accumulation. For this purpose, undisturbed topsoil (0-20cm) samples collected in 2009 within the framework of the Land Use/Cover Area frame Survey (LUCAS) have been measured by gamma-spectrometry and ICP-MS to determine 137Cs (n=145) and 239+240Pu (n=108) activities. To restrict the analysis to undisturbed reference sites a geospatial database query selecting only sites having a slope angle <2 degree, outside riparian zones (to avoid depositional sites) and under permanent grassland cover (according to CORINE Land Cover and Landsat) was applied. This study reports preliminary results on the feasibility of establishing a 137Cs and 239+240Pu baseline inventory map for Central Europe. The 137Cs/239+240Pu activity ratios will further allow assessing the rate and the spatial variability of 137Cs Chernobyl fallout. The establishment of such baseline inventory map will provide a unique opportunity to assess soil redistribution for a comparable time-frame (1953-2009) following a harmonised methodological protocol across national boundaries.
Detection of atmospheric pressure loading using very long baseline interferometry measurements
NASA Technical Reports Server (NTRS)
Vandam, T. M.; Herring, T. A.
1994-01-01
Loading of the Earth by the temporal redistribution of global atmospheric mass is likely to displace the positions of geodetic monuments by tens of millimeters both vertically and horizontally. Estimates of these displacements are determined by convolving National Meteorological Center (NMC) global values of atmospheric surface pressure with Farrell's elastic Green's functions. An analysis of the distances between radio telescopes determined by very long baseline interferometry (VLBI) between 1984 and 1992 reveals that in many of the cases studied there is a significant contribution to baseline length change due to atmospheric pressure loading. Our analysis covers intersite distances of between 1000 and 10,000 km and is restricted to those baselines measured more than 100 times. Accounting for the load effects (after first removing a best fit slope) reduces the weighted root-mean-square (WRMS) scatter of the baseline length residuals on 11 of the 22 baselines investigated. The slight degradation observed in the WRMS scatter on the remaining baselines is largely consistent with the expected statistical fluctuations when a small correction is applied to a data set having a much larger random noise. The results from all baselines are consistent with approximately 60% of the computed pressure contribution being present in the VLBI length determinations. Site dependent coefficients determined by fitting local pressure to the theoretical radial displacement are found to reproduce the deformation caused by the regional pressure to within 25% for most inland sites. The coefficients are less reliable at near coastal and island stations.
Opio, Alex; Calnan, Jacqueline; Njeuhmeli, Emmanuel
2015-01-01
Background Uganda adopted voluntary medical male circumcision (VMMC) (also called Safe Male Circumcision in Uganda), as part of its HIV prevention strategy in 2010. Since then, the Ministry of Health (MOH) has implemented VMMC mostly with support from the United States President’s Emergency Plan for AIDS Relief (PEPFAR) through its partners. In 2012, two PEPFAR-led external quality assessments evaluated compliance of service delivery sites with minimum quality standards. Quality gaps were identified, including lack of standardized forms or registers, lack of documentation of client consent, poor preparedness for emergencies and use of untrained service providers. In response, PEPFAR, through a USAID-supported technical assistance project, provided support in quality improvement to the MOH and implementing partners to improve quality and safety in VMMC services and build capacity of MOH staff to continuously improve VMMC service quality. Methods and Findings Sites were supported to identify barriers in achieving national standards, identify possible solutions to overcome the barriers and carry out improvement plans to test these changes, while collecting performance data to objectively measure whether they had bridged gaps. A 53-indicator quality assessment tool was used by teams as a management tool to measure progress; teams also measured client-level indicators through self-assessment of client records. At baseline (February-March 2013), less than 20 percent of sites scored in the “good” range (>80%) for supplies and equipment, patient counseling and surgical procedure; by November 2013, the proportion of sites scoring “good” rose to 67 percent, 93 percent and 90 percent, respectively. Significant improvement was noted in post-operative follow-up at 48 hours, sexually transmitted infection assessment, informed consent and use of local anesthesia but not rate of adverse events. Conclusion Public sector providers can be engaged to address the quality of VMMC using a continuous quality improvement approach. PMID:26207986
Continued Monitoring of Indiana's SPS9-A Site : [Technical Summary
DOT National Transportation Integrated Search
2012-01-01
The Indianas SPS9-A site was initiated as a part of the : SHRPs LTPP program in 1997 to study the influence : of binder grades on mixture performance. In the earlier : phase of this study entitled Development of Indianas : SPS9-A Site, five ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-30
... DEPARTMENT OF HOMELAND SECURITY Transportation Security Administration New Agency Information Collection Activity Under OMB Review: Public Transportation Baseline Assessment for Security Enhancement... voluntary site visits with security and operating officials of public transportation systems. This program...
Effects of naloxone distribution to likely bystanders: Results of an agent-based model.
Keane, Christopher; Egan, James E; Hawk, Mary
2018-05-01
Opioid overdose deaths in the US rose dramatically in the past 16 years, creating an urgent national health crisis with no signs of immediate relief. In 2017, the President of the US officially declared the opioid epidemic to be a national emergency and called for additional resources to respond to the crisis. Distributing naloxone to community laypersons and people at high risk for opioid overdose can prevent overdose death, but optimal distribution methods have not yet been pinpointed. We conducted a sequential exploratory mixed methods design using qualitative data to inform an agent-based model to improve understanding of effective community-based naloxone distribution to laypersons to reverse opioid overdose. The individuals in the model were endowed with cognitive and behavioral variables and accessed naloxone via community sites such as pharmacies, hospitals, and urgent-care centers. We compared overdose deaths over a simulated 6-month period while varying the number of distribution sites (0, 1, and 10) and number of kits given to individuals per visit (1 versus 10). Specifically, we ran thirty simulations for each of thirteen distribution models and report average overdose deaths for each. The baseline comparator was no naloxone distribution. Our simulations explored the effects of distribution through syringe exchange sites with and without secondary distribution, which refers to distribution of naloxone kits by laypersons within their social networks and enables ten additional laypersons to administer naloxone to reverse opioid overdose. Our baseline model with no naloxone distribution predicted there would be 167.9 deaths in a six month period. A single distribution site, even with 10 kits picked up per visit, decreased overdose deaths by only 8.3% relative to baseline. However, adding secondary distribution through social networks to a single site resulted in 42.5% fewer overdose deaths relative to baseline. That is slightly higher than the 39.9% decrease associated with a tenfold increase in the number of sites, all distributing ten kits but with no secondary distribution. This suggests that, as long as multiple kits are picked up per visit, adding secondary distribution is at least as effective as increasing sites from one to ten. Combining the addition of secondary distribution with an increase in sites from one to ten resulted in a 61.1% drop in deaths relative to the baseline. Adding distribution through a syringe exchange site resulted in a drop of approximately 65% of deaths relative to baseline. In fact, when enabling distribution through a clean-syringe site, the secondary distribution through networks contributed no additional drops in deaths. Community-based naloxone distribution to reverse opioid overdose may significantly reduce deaths. Optimal distribution methods may include secondary distribution so that the person who picks up naloxone kits can enable others in the community to administer naloxone, as well as targeting naloxone distribution to sites where individuals at high-risk for opioid overdose death are likely to visit, such as syringe-exchange programs. This study design, which paired exploratory qualitative data with agent-based modeling, can be used in other settings seeking to implement and improve naloxone distribution programs. Copyright © 2018 The Author(s). Published by Elsevier B.V. All rights reserved.
Site Protection Program and Progress Report of Ali Observatory, Tibet
NASA Astrophysics Data System (ADS)
Yao, Yongqiang; Zhou, Yunhe; Wang, Xiaohua; He, Jun; Zhou, Shu
2015-08-01
The Ali observatory, Tibet, is a promising new site identified through ten year site survey over west China, and it is of significance to establish rules of site protection during site development. The site protection program is described with five aspects: site monitoring, technical support, local government support, specific organization, and public education. The long-term sky brightness monitoring is ready with site testing instruments and basic for light pollution measurement; the monitoring also includes directions of main light sources, providing periodical reports and suggestions for coordinating meetings. The technical supports with institutes and manufacturers help to publish lighting standards and replace light fixtures; the research pays special attention to the blue-rich sources, which impact the important application of high altitude sites. An official leading group towards development and protection of astronomical resources has been established by Ali government; one of its tasks is to issue regulations against light pollution, including special restrictions of airport, mine, and winter heating, and to supervise lighting inspection and rectification. A site protection office under the official group and local astronomical society are organized by Ali observatory; the office can coordinate in government levels and promote related activities. A specific website operated by the protection office releases activity propaganda, evaluation results, and technical comparison with other observatories. Both the site protection office and Ali observatory take responsibility for public education, including popular science lectures, light pollution and energy conservation education. Ali Night Sky Park has been constructed and opens in 2014, and provides a popular place and observational experience. The establishment of Ali Observatory and Night Sky Park brings unexpected social influence, and the starry sky trip to Ali becomes a new format of culture-oriented travels in China. The related news reports and network propaganda have drawn attention of national top leadership, instructing to further investigate national support policies.
Superfund Site Reuse How-To Reports
The reports on this page provide technical information on how sites with hazardous waste have been safely reused for various purposes, such as recreation, while ensuring that the protectiveness of the remedy is maintained.
33. SITE BUILDING 002 SCANNER BUILDING MECHANICAL ROOM ...
33. SITE BUILDING 002 - SCANNER BUILDING - MECHANICAL ROOM 105, VIEW OF CHILLER ROOM MOTOR CONTROL CENTER. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kiatreungwattana, K.; Mosey, G.; Jones-Johnson, S.
2013-04-01
The Environmental Protection Agency and the National Renewable Energy Laboratory developed this best practices document to address common technical challenges for siting solar photovoltaics (PV) on municipal solid waste (MSW) landfills. The purpose of this document is to promote the use of MSW landfills for solar energy systems. Closed landfills and portions of active landfills with closed cells represent thousands of acres of property that may be suitable for siting solar photovoltaics (PV). These closed landfills may be suitable for near-term construction, making these sites strong candidate to take advantage of the 30% Federal Business Energy Investment Tax Credit. Itmore » was prepared in response to the increasing interest in siting renewable energy on landfills from solar developers; landfill owners; and federal, state, and local governments. It contains examples of solar PV projects on landfills and technical considerations and best practices that were gathered from examining the implementation of several of these projects.« less
1989-03-21
Seattle.Washington 98108 (206)767-5060 Chemistr . Microbklog. and Technical Services 1. TO: Science Applications International Corporation LABORATORY I.D...Certificate 940 South HarneySt.. Seattle.Washington 98108 (206)767-5060 ) Chemistr . Micrcbiob .and Technical Services TO: Science Applications...HarnreySt Seattle.Washington 98108 (206)767-5060 Chemistr " Microbiocoy and Technical Services SAIC LABORATORY NO. 3894 APPENDIX A Method Blank
July 2011 report prepared by Environmental Planning Specialists, Inc. of on-site threats to human health posed by post removal action levels of chemicals in the soil of the LCP Chemicals Superfund site in Brunswick, Georgia.
Channel-morphology data for the Tongue River and selected tributaries, southeastern Montana, 2001-02
Chase, Katherine J.
2004-01-01
Coal-bed methane exploration and production have begun within the Tongue River watershed in southeastern Montana. The development of coal-bed methane requires production of large volumes of ground water, some of which may be discharged to streams, potentially increasing stream discharge and sediment load. Changes in stream discharge or sediment load may result in changes to channel morphology through changes in erosion and vegetation. These changes might be subtle and difficult to detect without baseline data that indicate stream-channel conditions before extensive coal-bed methane development began. In order to provide this baseline channel-morphology data, the U.S. Geological Survey, in cooperation with the Bureau of Land Management, collected channel-morphology data in 2001-02 to document baseline conditions for several reaches along the Tongue River and selected tributaries. This report presents channel-morphology data for five sites on the mainstem Tongue River and four sites on its tributaries. Bankfull, water-surface, and thalweg elevations, channel sections, and streambed-particle sizes were measured along reaches near streamflow-gaging stations. At each site, the channel was classified using methods described by Rosgen. For six sites, bankfull discharge was determined from the stage- discharge relation at the gage for the stage corresponding to the bankfull elevation. For three sites, the step-backwater computer model HEC-RAS was used to estimate bankfull discharge. Recurrence intervals for the bankfull discharge also were estimated for eight of the nine sites. Channel-morphology data for each site are presented in maps, tables, graphs, and photographs.
Waste Receiving and Processing (WRAP) Module 1 Hazards Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
CAMPBELL, L.R.
1999-09-29
This document establishes the technical basis in support of Emergency Planning activities for the WRAP Module 1 Facility on the Hanford Site. Through this document, the technical basis for the development of facility specific Emergency Action Levels and Emergency Planning Zone is demonstrated.
This Technical Guidance Document is intended to augment the numerous construction quality control and construction quality assurance (CQC and CQA) documents that are available far materials associated with waste containment systems developed for Superfund site remediation. In ge...
Technical Report (2015) Feasibility Study of Economics and Performance of Solar Photovoltaics at the Report (2014) Feasibility Study of Economics and Performance of Solar Photovoltaics at the Price Landfill Site in Pleasantville, New Jersey, NREL Technical Report (2013) Feasibility Study of Economics and
75 FR 71526 - Corporate Credit Unions, Technical Corrections
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
... NATIONAL CREDIT UNION ADMINISTRATION 12 CFR Part 704 RIN 3133-AD58 Corporate Credit Unions... request for comments. SUMMARY: NCUA is issuing technical corrections to its corporate credit union rule... for submitting comments. NCUA Web site: http://www.ncua.gov/Resources/RegulationsOpinionsLaws/Proposed...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morgans, D. L.; Lindberg, S. L.
The purpose of this technical approach document (TAD) is to document the assumptions, equations, and methods used to perform the groundwater pathway radiological dose calculations for the revised Hanford Site Composite Analysis (CA). DOE M 435.1-1, states, “The composite analysis results shall be used for planning, radiation protection activities, and future use commitments to minimize the likelihood that current low-level waste disposal activities will result in the need for future corrective or remedial actions to adequately protect the public and the environment.”
OTEC riser cable system, Phase II: conceptual design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-10-01
Studies are summarized of conceptual designs of riser cable systems for OTEC pilot plants of both the spar and plantship configurations located at sites off the southeast coast of Puerto Rico. The studies utilize a baseline pilot plant riser cable, the design of which has been developed and reported on in other reports. Baseline riser cable systems for OTEC pilot plants are identified, system hardware consistent with these designs are conceptualized, and comparisons of the various system concepts are provided. It is concluded that there are three riser cable systems feasible for a spar pilot plant platform at the Puntamore » Yeguas site, and two riser cable systems feasible at the plantship pilot plant at the Punta Tuna site. Recommendations for further investigations in the areas of materials, hardware design and pre-installation site surveys are also addressed.« less
LaRowe, Tara L; Tomayko, Emily J; Meinen, Amy M; Hoiting, Jill; Saxler, Courtney; Cullen, Bridget
2016-07-20
Early childcare and education (ECE) is a prime setting for obesity prevention and the establishment of healthy behaviors. The objective of this quasi-experimental study was to examine the efficacy of the Active Early guide, which includes evidenced-based approaches, provider resources, and training, to improve physical activity opportunities through structured (i.e. teacher-led) activity and environmental changes thereby increasing physical activity among children, ages 2-5 years, in the ECE setting. Twenty ECE programs in Wisconsin, 7 family and 13 group, were included. An 80-page guide, Active Early, was developed by experts and statewide partners in the fields of ECE, public health, and physical activity and was revised by ECE providers prior to implementation. Over 12 months, ECE programs received on-site training and technical assistance to implement the strategies and resources provided in the Active Early guide. Main outcome measures included observed minutes of teacher-led physical activity, physical activity environment measured by the Environment and Policy Assessment and Observation (EPAO) instrument, and child physical activity levels via accelerometry. All measures were collected at baseline, 6 months, and 12 months and were analyzed for changes over time. Observed teacher-led physical activity significantly increased from 30.9 ± 22.7 min at baseline to 82.3 ± 41.3 min at 12 months. The change in percent time children spent in sedentary activity decreased significantly after 12 months (-4.4 ± 14.2 % time, -29.2 ± 2.6 min, p < 0.02). Additionally, as teacher led-activity increased, percent time children were sedentary decreased (r = -0.37, p < 0.05) and percent time spent in light physical activity increased (r = 0.35, p < 0.05). Among all ECE programs, the physical activity environment improved significantly as indicated by multiple sub-scales of the EPAO; scores showing the greatest increases were the Training and Education (14.5 ± 6.5 at 12-months vs. 2.4 ± 3.8 at baseline, p < 0.01) and Physical Activity Policy (18.6 ± 4.6 at 12-months vs. 2.0 ± 4.1 at baseline, p < 0.01). Active Early promoted improvements in providing structured (i.e. teacher-led) physical activity beyond the recommended 60 daily minutes using low- to no-cost strategies along with training and environmental changes. Furthermore, it was observed that Active Early positively impacted child physical activity levels by the end of the intervention. However, resources, training, and technical assistance may be necessary for ECE programs to be successful beyond the use of the Active Early guide. Implementing local-level physical activity policies combined with support from local and statewide partners has the potential to influence higher standards for regulated ECE programs.
Assessing the quality of cost management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fayne, V.; McAllister, A.; Weiner, S.B.
1995-12-31
Managing environmental programs can be effective only when good cost and cost-related management practices are developed and implemented. The Department of Energy`s Office of Environmental Management (EM), recognizing this key role of cost management, initiated several cost and cost-related management activities including the Cost Quality Management (CQM) Program. The CQM Program includes an assessment activity, Cost Quality Management Assessments (CQMAs), and a technical assistance effort to improve program/project cost effectiveness. CQMAs provide a tool for establishing a baseline of cost-management practices and for measuring improvement in those practices. The result of the CQMA program is an organization that has anmore » increasing cost-consciousness, improved cost-management skills and abilities, and a commitment to respond to the public`s concerns for both a safe environment and prudent budget outlays. The CQMA program is part of the foundation of quality management practices in DOE. The CQMA process has contributed to better cost and cost-related management practices by providing measurements and feedback; defining the components of a quality cost-management system; and helping sites develop/improve specific cost-management techniques and methods.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-03
... available under ADAMS accession number ML111040419, and the ``Technical Analysis Supporting Definition of... NUCLEAR REGULATORY COMMISSION 10 CFR Part 61 RIN 3150-AI92 [NRC-2011-0012] Site-Specific Analyses...-level radioactive waste disposal facilities to conduct site-specific analyses to demonstrate compliance...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
Baseline Risk Assessment for the F-Area Burning/Rubble Pits and Rubble Pit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Palmer, E.
This document provides an overview of the Savannah River Site (SRS) and a description of the F-Area Burning/Rubble Pits (BRPs) and Rubble Pit (RP) unit. It also describes the objectives and scope of the baseline risk assessment (BRA).
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less
Wan, Yue-Meng; Li, Yu-Hua; Xu, Ying; Wu, Hua-Mei; Li, Ying-Chun; Wu, Xi-Nan; Yang, Jin-Hui
2018-01-16
Transjugular intrahepatic portosystemic shunt (TIPS) is an established method for portal hypertension. This study was to investigate the long-term safety, technical success, and patency of TIPS, and to determine the risk factors and clinical impacts of shunt dysfunction. A total of 154 consecutive patients undergoing embolotherapy of gastric coronary vein and/or short gastric vein and TIPS creation were prospectively studied. Follow-up data included technical success, patency and revision of TIPS, and overall survival of patients. During the study, the primary and secondary technical success rates were 98.7% and 100%, respectively. Sixty-three patients developed shunt dysfunction, 30 with shunt stenosis and 33 with shunt occlusion. The cumulative 60-month primary, primary assisted, and secondary patency rates were 19.6%, 43.0%, and 93.4%, respectively. The cumulative 60-month overall survival rates were similar between the TIPS dysfunction group and the TIPS non-dysfunction group (68.6% vs. 58.6%, P = .096). Baseline portal vein thrombosis (P < .001), use of bare stents (P = .018), and portal pressure gradient (PPG) (P = .020) were independent predictors for shunt dysfunction, hepatocellular carcinoma (P < .001), and ascites (P = .003) for overall survival. The accuracy of PPG for shunt dysfunction was statistically significant (P < .001), and a cutoff value of 8.5 had 77.8% sensitivity and 64.8% specificity. The long-term safety, technical success, and patency of TIPS were good; baseline portal vein thrombosis, use of bare stents, and PPG were significantly associated with shunt dysfunction; shunt dysfunction has little impact on patients' long-term survival because of high secondary patency rates. Copyright © 2017 The Association of University Radiologists. Published by Elsevier Inc. All rights reserved.
Meehan, Thomas P; Qazi, Daniel J; Van Hoof, Thomas J; Ho, Shih-Yieh; Eckenrode, Sheila; Spenard, Ann; Pandolfi, Michelle; Johnson, Florence; Quetti, Deborah
2015-08-01
To describe and evaluate the impact of quality improvement (QI) support provided to skilled nursing facilities (SNFs) by a Quality Improvement Organization (QIO). Retrospective, mixed-method, process evaluation of a QI project intended to decrease preventable hospital readmissions from SNFs. Five SNFs in Connecticut. SNF Administrators, Directors of Nursing, Assistant Directors of Nursing, Admissions Coordinators, Registered Nurses, Certified Nursing Assistants, Receptionists, QIO Quality Improvement Consultant. QIO staff provided training and technical assistance to SNF administrative and clinical staff to establish or enhance QI infrastructure and implement an established set of QI tools [Interventions to Reduce Acute Care Transfers (INTERACT) tools]. Baseline SNF demographic, staffing, and hospital readmission data; baseline and follow-up SNF QI structure (QI Committee), processes (general and use of INTERACT tools), and outcome (30-day all-cause hospital readmission rates); details of QIO-provided training and technical assistance; QIO-perceived barriers to quality improvement; SNF leadership-perceived barriers, accomplishments, and suggestions for improvement of QIO support. Success occurred in establishing QI Committees and targeting preventable hospital readmissions, as well as implementing INTERACT tools in all SNFs; however, hospital readmission rates decreased in only 2 facilities. QIO staff and SNF leaders noted the ongoing challenge of engaging already busy SNF staff and leadership in QI activities. SNF leaders reported that they appreciated the training and technical assistance that their institutions received, although most noted that additional support was needed to bring about improvement in readmission rates. This process evaluation documented mixed clinical results but successfully identified opportunities to improve recruitment of and provision of technical support to participating SNFs. Recommendations are offered for others who wish to conduct similar projects. Copyright © 2015 AMDA – The Society for Post-Acute and Long-Term Care Medicine. All rights reserved.
NASA Technical Reports Server (NTRS)
Prater, T. J.; Bean, Q. A.; Werkheiser, N. J.; Johnston, M. M.; Ordonez, E. A.; Ledbetter, F. E.; Risdon, D. L.; Stockman, T. J.; Sandridge, S. K. R.; Nelson, G. M.
2016-01-01
NASA Marshall Space Flight Center (MSFC) and the Agency as a whole are currently engaged in a number of in-space manufacturing (ISM) activities that have the potential to reduce launch costs, enhance crew safety, and provide the capabilities needed to undertake long-duration spaceflight. The recent 3D Printing in Zero-G experiment conducted on board the International Space Station (ISS) demonstrated that parts of acrylonitrile butadiene styrene (ABS) plastic can be manufactured in microgravity using fused deposition modeling (FDM). This project represents the beginning of the development of a capability that is critical to future NASA missions. Current and future ISM activities will require the development of baseline material properties to facilitate design, analysis, and certification of materials manufactured using in-space techniques. The purpose of this technical interchange meeting (TIM) was to bring together MSFC practitioners and experts in materials characterization and development of baseline material properties for emerging technologies to advise the ISM team as we progress toward the development of material design values, standards, and acceptance criteria for materials manufactured in space. The overall objective of the TIM was to leverage MSFC's shared experiences and collective knowledge in advanced manufacturing and materials development to construct a path forward for the establishment of baseline material properties, standards development, and certification activities related to ISM. Participants were asked to help identify research and development activities that will (1) accelerate acceptance and adoption of ISM techniques among the aerospace design community; (2) benefit future NASA programs, commercial technology developments, and national needs; and (3) provide opportunities and avenues for further collaboration.
The use of gene expression profiling to predict chemical mode of action would be enhanced by better characterization of variance due to individual, environmental, and technical factors. Meta-analysis of microarray data from untreated or vehicle-treated animals within the control ...
A Student Environment Model: A Measure of Institutional Effectiveness. AIR 1998 Annual Forum Paper.
ERIC Educational Resources Information Center
Morris-Baldwin, Darline
This study traces the development of a student environment model (SEM) at Texas State Technical College (Waco) that is used to assess students' perceptions of their college environment outside the formal classroom, provides baseline data for comparative analyses, establishes goals for student support services, measures program and process…
ERIC Educational Resources Information Center
Hull, Daniel M.; Lovett, James E.
The Robotics/Automated Systems Technician (RAST) project developed a robotics technician model curriculum for the use of state directors of vocational education and two-year college vocational/technical educators. A baseline management plan was developed to guide the project. To provide awareness, project staff developed a dissemination plan…
DOT National Transportation Integrated Search
2012-03-01
Many organizations have become concerned about the environmental impact of their facilities and operations. In order to lessen environmental impact, quantitative assessment of practice based on improvements from a baseline condition is needed. The Ka...
The report describes in detail the source testing, construction, and data reduction/analysis activities that comprise the three phases of a technology demonstration program. Phase I consisted of a detailed baseline evaluation of several paint spray booths operated at the Barstow,...
Participation in the Analysis of the Far-Infrared/Submillmeter Interferometer
NASA Technical Reports Server (NTRS)
Lorenzini, Enrico C.
2005-01-01
We have contributed to the development of the Submillimiter Probe of the Evolution of Cosmic Structure (SPECS) by analyzing various aspects related to the tethers that connect the spacecraft of this space interferometer. We have focused our analysis on key topics as follows: (a) helping in the configuration selection; (b) computing the system eigenfrequencies as a function of baseline length; (c) developing techniques and conceptual design of devices for damping the tether oscillations; (d) carrying out numerical simulations of tethered formation to assess the effects of environmental perturbations upon the baseline length variation; (e) developing control laws for reconfiguring the baseline length; (f) devising control laws for fast retargeting of the interferometer at moderate baseline lengths; (g) estimating the survivability to micrometeoroid impacts of a tether at L2; and (h) developing a conceptual design of a high- strength and survivable tether. The work was conducted for NASA Goddard Space Flight Center under Grant NNG04GQ21G with William Danchi as technical monitor.
Advanced Technology Composite Fuselage: Program Overview
NASA Technical Reports Server (NTRS)
Ilcewicz, L. B.; Smith, P. J.; Hanson, C. T.; Walker, T. H.; Metschan, S. L.; Mabson, G. E.; Wilden, K. S.; Flynn, B. W.; Scholz, D. B.; Polland, D. R.;
1997-01-01
The Advanced Technology Composite Aircraft Structures (ATCAS) program has studied transport fuselage structure with a large potential reduction in the total direct operating costs for wide-body commercial transports. The baseline fuselage section was divided into four 'quadrants', crown, keel, and sides, gaining the manufacturing cost advantage possible with larger panels. Key processes found to have savings potential include (1) skins laminated by automatic fiber placement, (2) braided frames using resin transfer molding, and (3) panel bond technology that minimized mechanical fastening. The cost and weight of the baseline fuselage barrel was updated to complete Phase B of the program. An assessment of the former, which included labor, material, and tooling costs, was performed with the help of design cost models. Crown, keel, and side quadrant cost distributions illustrate the importance of panel design configuration, area, and other structural details. Composite sandwich panel designs were found to have the greatest cost savings potential for most quadrants. Key technical findings are summarized as an introduction to the other contractor reports documenting Phase A and B work completed in functional areas. The current program status in resolving critical technical issues is also highlighted.
Mariano Lake Mine: Technical Reports
This Final Removal Site Evaluation describes the objectives, work performed, and results of a Removal Site Evaluation (RSE) at the Mariano Lake Mine, which was performed by ARCADIS U.S., Inc. on behalf of Chevron Environmental Management Company.
24. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...
24. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER -- MWOC IN OPEARATION AT 1924 ZULU TIME. 26 OCTOBER, 1999. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
ERIC Educational Resources Information Center
Mody, Bella
1979-01-01
Describes the Satellite Instructional Television Experiment (SITE) project in India during 1975-76, including programing patterns, formats, and audiences. Demonstrates that countries like India have the technical and managerial capability to design, operate, and maintain advanced communication technology. (JMF)
E-ELT Site Chosen - World's Biggest Eye on the Sky to be Located on Armazones, Chile
NASA Astrophysics Data System (ADS)
2010-04-01
On 26 April 2010, the ESO Council selected Cerro Armazones as the baseline site for the planned 42-metre European Extremely Large Telescope (E-ELT). Cerro Armazones is a mountain at an altitude of 3060 metres in the central part of Chile's Atacama Desert, some 130 kilometres south of the town of Antofagasta and about 20 kilometres from Cerro Paranal, home of ESO's Very Large Telescope. "This is an important milestone that allows us to finalise the baseline design of this very ambitious project, which will vastly advance astronomical knowledge," says Tim de Zeeuw, ESO's Director General. "I thank the site selection team for the tremendous work they have done over the past few years." ESO's next step is to build a European extremely large optical/infrared telescope (E-ELT) with a primary mirror 42 metres in diameter. The E-ELT will be "the world's biggest eye on the sky" - the only such telescope in the world. ESO is drawing up detailed construction plans together with the community. The E-ELT will address many of the most pressing unsolved questions in astronomy, and may, eventually, revolutionise our perception of the Universe, much as Galileo's telescope did 400 years ago. The final go-ahead for construction is expected at the end of 2010, with the start of operations planned for 2018. The decision on the E-ELT site was taken by the ESO Council, which is the governing body of the Organisation composed of representatives of ESO's fourteen Member States, and is based on an extensive comparative meteorological investigation, which lasted several years. The majority of the data collected during the site selection campaigns will be made public in the course of the year 2010. Various factors needed to be considered in the site selection process. Obviously the "astronomical quality" of the atmosphere, for instance, the number of clear nights, the amount of water vapour, and the "stability" of the atmosphere (also known as seeing) played a crucial role. But other parameters had to be taken into account as well, such as the costs of construction and operations, and the operational and scientific synergy with other major facilities (VLT/VLTI, VISTA, VST, ALMA and SKA etc). In March 2010, the ESO Council was provided with a preliminary report with the main conclusions from the E-ELT Site Selection Advisory Committee [1]. These conclusions confirmed that all the sites examined in the final shortlist (Armazones, Ventarrones, Tolonchar and Vizcachas in Chile, and La Palma in Spain) have very good conditions for astronomical observing, each one with its particular strengths. The technical report concluded that Cerro Armazones, near Paranal, stands out as the clearly preferred site, because it has the best balance of sky quality for all the factors considered and can be operated in an integrated fashion with ESO's Paranal Observatory. Cerro Armazones and Paranal share the same ideal conditions for astronomical observations. In particular, over 320 nights are clear per year. Taking into account the very clear recommendation of the Site Selection Advisory Committee and all other relevant aspects, especially the scientific quality of the site, Council has now endorsed the choice of Cerro Armazones as the E-ELT baseline site [2]. "Adding the transformational scientific capabilities of the E-ELT to the already tremendously powerful integrated VLT observatory guarantees the long-term future of Paranal as the most advanced optical/infrared observatory in the world and further strengthens ESO's position as the world-leading organisation for ground-based astronomy," says de Zeeuw. In anticipation of the choice of Cerro Armazones as the future site of the E-ELT and to facilitate and support the project, the Chilean Government has agreed to donate to ESO a substantial tract of land contiguous to ESO's Paranal property and containing Armazones in order to ensure the continued protection of the site against all adverse influences, in particular light pollution and mining activities. Notes [1] The independent E-ELT Site Selection Advisory Committee (SSAC) has been analysing results from several possible sites worldwide in great detail. Similar efforts have been carried out by the Thirty-Meter Telescope (TMT) site selection team from the US. For the sake of efficiency, the sites pre-selected by the TMT team (all in North and South America) were not studied by the SSAC, as the TMT team shared their data with the SSAC. Two of the sites on the SSAC short list, including Armazones, were on the TMT list. [2] The full ESO Council Resolution reads as follow: Resolution of ESO Council on the Baseline Site for the E-ELT Recognising * the very clear recommendation from the Site Selection Advisory Committee that the E-ELT should be located on Cerro Armazones in Northern Chile * the considerable scientific synergy that would result between the E-ELT and future facilities in the Southern Hemisphere, most notably ALMA and SKA * the operational and scientific synergies with Paranal that would result and expressing its warmest appreciation for * the very generous offers from Spain and Chile to host the E-ELT * the very considerable contributions to the quality and depth of the discussion on the siting of the E-ELT made by Chile and Spain in the course of developing their offers; Council has concluded that the overriding driver for the decision on the location of the E-ELT should be the scientific quality of the site. The scientific qualities of Cerro Armazones and the positive impact that locating the E-ELT there will have on the future scientific leadership of ESO are sufficiently compelling to outweigh the very substantial offer made by Spain. Council has therefore resolved to approve the recommendation of the Director General to adopt Cerro Armazones in Chile as the baseline site for the E-ELT. Council noted that this decision is essential for the completion of the construction proposal for decision at a later date. More information ESO, the European Southern Observatory, is the foremost intergovernmental astronomy organisation in Europe and the world's most productive astronomical observatory. It is supported by 14 countries: Austria, Belgium, the Czech Republic, Denmark, France, Finland, Germany, Italy, the Netherlands, Portugal, Spain, Sweden, Switzerland and the United Kingdom. ESO carries out an ambitious programme focused on the design, construction and operation of powerful ground-based observing facilities enabling astronomers to make important scientific discoveries. ESO also plays a leading role in promoting and organising cooperation in astronomical research. ESO operates three unique world-class observing sites in Chile: La Silla, Paranal and Chajnantor. At Paranal, ESO operates the Very Large Telescope, the world's most advanced visible-light astronomical observatory and VISTA, the world's largest survey telescope. ESO is the European partner of a revolutionary astronomical telescope ALMA, the largest astronomical project in existence.
Multi-year high-frequency hydrothermal monitoring of selected high-threat Cascade Range volcanoes
NASA Astrophysics Data System (ADS)
Crankshaw, I. M.; Archfield, S. A.; Newman, A. C.; Bergfeld, D.; Clor, L. E.; Spicer, K. R.; Kelly, P. J.; Evans, W. C.; Ingebritsen, S. E.
2018-05-01
From 2009 to 2015 the U.S. Geological Survey (USGS) systematically monitored hydrothermal behavior at selected Cascade Range volcanoes in order to define baseline hydrothermal and geochemical conditions. Gas and water data were collected regularly at 25 sites on 10 of the highest-risk volcanoes in the Cascade Range. These sites include near-summit fumarole groups and springs/streams that show clear evidence of magmatic influence (high 3He/4He ratios and/or large fluxes of magmatic CO2 or heat). Site records consist mainly of hourly temperature and hydrothermal-flux data. Having established baseline conditions during a multiyear quiescent period, the USGS reduced monitoring frequency from 2015 to present. The archived monitoring data are housed at (doi:10.5066/F72N5088). These data (1) are suitable for retrospective comparison with other continuous geophysical monitoring data and (2) will provide context during future episodes of volcanic unrest, such that unrest-related variations at these thoroughly characterized sites will be more clearly recognizable. Relatively high-frequency year-round data are essential to achieve these objectives, because many of the time series reveal significant diurnal, seasonal, and inter-annual variability that would tend to mask unrest signals in the absence of baseline data. Here we characterize normal variability for each site, suggest strategies to detect future volcanic unrest, and explore deviations from background associated with recent unrest.
This report highlights significant projects that the ETSC has supported throughout fiscal year 2014. Projects have addressed an array of environmental scenarios, including but not limited to remote mining contamination, expansive landfill waste, sediment remediation by capping, ...
Hazardous Materials Technician. Technical Committee on Occupational Curriculum Development.
ERIC Educational Resources Information Center
Northern Montana Coll., Havre. Montana Center for Vocational Education, Research, Curriculum and Personnel Development.
This document describes Montana's postsecondary curriculum to prepare hazardous materials technicians. Basic general education requirements are described. The technical skills and the knowledge associated with each are listed in the following categories: (1) site assessment; (2) sampling materials; (3) handling materials; (4) recording data; (5)…
This fact sheet summarizes the findings of a report drafted by a joint Interagency Environmental Pathway Modeling Working Group. It is to be used by technical staff responsible for implementing flow and transport models to support cleanup decisions.
Using Corporate-Based Methods To Assess Technical Communication Programs.
ERIC Educational Resources Information Center
Faber, Brenton; Bekins, Linn; Karis, Bill
2002-01-01
Investigates methods of program assessment used by corporate learning sites and profiles value added methods as a way to both construct and evaluate academic programs in technical communication. Examines and critiques assessment methods from corporate training environments including methods employed by corporate universities and value added…
7 CFR 2003.18 - Functional organization of RHS.
Code of Federal Regulations, 2014 CFR
2014-01-01
... and 504 Rural Housing direct and guaranteed loan and grant programs, Rural Housing and Self-Help Site loans, the Self-Help Technical Assistance grant program, Housing Application Packaging and Technical and Supervisory Assistance grants, and Home Improvement and Repaid loans and grants. The office directs the...
7 CFR 2003.18 - Functional organization of RHS.
Code of Federal Regulations, 2012 CFR
2012-01-01
... and 504 Rural Housing direct and guaranteed loan and grant programs, Rural Housing and Self-Help Site loans, the Self-Help Technical Assistance grant program, Housing Application Packaging and Technical and Supervisory Assistance grants, and Home Improvement and Repaid loans and grants. The office directs the...
7 CFR 2003.18 - Functional organization of RHS.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and 504 Rural Housing direct and guaranteed loan and grant programs, Rural Housing and Self-Help Site loans, the Self-Help Technical Assistance grant program, Housing Application Packaging and Technical and Supervisory Assistance grants, and Home Improvement and Repaid loans and grants. The office directs the...
7 CFR 2003.18 - Functional organization of RHS.
Code of Federal Regulations, 2011 CFR
2011-01-01
... and 504 Rural Housing direct and guaranteed loan and grant programs, Rural Housing and Self-Help Site loans, the Self-Help Technical Assistance grant program, Housing Application Packaging and Technical and Supervisory Assistance grants, and Home Improvement and Repaid loans and grants. The office directs the...
78. View of radar systems technical publication library, transmitter building ...
78. View of radar systems technical publication library, transmitter building no. 102, second floor. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
75 FR 52737 - Meeting of the Mobile Sources Technical Review Subcommittee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-27
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9193-9] Meeting of the Mobile Sources Technical Review... Federal Advisory Committee Act, Public Law 92- 463, notice is hereby given that the Mobile Sources... the Subcommittee's Web Site: http://www.epa.gov/air/caaac/mobile_sources.html . MSTRS listserver...
76 FR 58275 - Meeting of the Mobile Sources Technical Review Subcommittee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9466-9] Meeting of the Mobile Sources Technical Review... Federal Advisory Committee Act, Public Law 92- 463, notice is hereby given that the Mobile Sources... the Subcommittee's Web site: http://www.epa.gov/air/caaac/mobile_sources.html . MSTRS listserver...
Fort Bowie National Historic Site : acoustical monitoring
DOT National Transportation Integrated Search
2014-04-01
During the summer (September October) of 2010, Volpe Center personnel deployed acoustic measurement system at Fort Bowie National Historic Site (FOBO) for approximately one month. The baseline data collected during this period will help park mana...
NASA Astrophysics Data System (ADS)
Yang, Yanmin; Liu, De Li; Anwar, Muhuddin Rajin; O'Leary, Garry; Macadam, Ian; Yang, Yonghui
2016-02-01
Wheat production is expected to be affected by climate change through changing components of the crop water balance such as rainfall, evapotranspiration (ET), runoff and drainage. We used the Agricultural Production Systems Simulator (APSIM)-wheat model to simulate the potential impact of climate change on field water balance, ET and water use efficiency (WUE) under the SRES A2 emissions scenario. We ran APSIM with daily climate data statistically downscaled from 18 Global Circulation Models (GCMs). Twelve soil types of varying plant available water holding capacity (PAWC) at six sites across semi-arid southeastern Australia were considered. Biases in the GCM-simulated climate data were bias-corrected against observations for the 1961-1999 baseline period. However, biases in the APSIM output data relative to APSIM simulations forced with climate observations remained. A secondary bias correction was therefore performed on the APSIM outputs. Bias-corrected APSIM outputs for a future period (2021-2040) were compared with APSIM outputs generated using observations for the baseline period to obtain future changes. The results show that effective rainfall was decreased over all sites due to decreased growing season rainfall. ET was decreased through reduced soil evaporation and crop transpiration. There were no significant changes in runoff at any site. The variation in deep drainage between sites was much greater than for runoff, ranging from less than a few millimetres at the drier sites to over 100 mm at the wetter. However, in general, the averaged drainage over different soil types were not significantly different between the baseline (1961-1999) and future period of 2021-2040 ( P > 0.05). For the wetter sites, the variations in the future changes in drainage and runoff between the 18 GCMs were larger than those of the drier sites. At the dry sites, the variation in drainage decreased as PAWC increased. Overall, water use efficiency based on transpiration (WUE_T) and ET (WUE_ET) increased by 1.1 to 1.6 and 0.7 to 1.3 kg ha-1 mm-1, respectively, over the baseline historical climate. Significant relationships between changes in wheat yield and PAWC were only seen at three sites. At the dry sites, the impact of a future climate under a soil of high PAWC was less than that under one of low PAWC. Conversely, the opposite response was seen at two wetter sites, highlighting the importance of PAWC and rainfall in determining the interactive response of crops to primary components of the water balance.
Chizhov, K; Sneve, M K; Shandala, N; Siegien-Iwaniuk, K; Smith, G M; Krasnoschekov, A; Kosnikov, A; Grigoriev, A; Simakov, A; Kemsky, I; Kryuchkov, V
2018-06-01
The Coastal Technical Base (CTB) №569 at Andreeva Bay was established in the early 1960s and intended for the refueling of nuclear submarine reactors and temporary storage of spent nuclear fuel (SNF) and radioactive waste (RW). In 2001, the base was transferred to the Russian Ministry for Atomic Energy and the site remediation began. The paper describes in detail the radiation situation change at the technical site in Andreeva Bay from 2002-2016, the period of preparation for the most critical phase of remedial work: removal of spent fuel assemblies. The analysis of aggregated indicators and data mining were used. The article suggests the best number and location of checkpoints needed to ensure sufficient accuracy of the radiation situation description. The fractal properties of the radiation field are studied using the Hurst index. The relationship between checkpoints was assessed using the method of searching for checkpoint communities. The decrease in the integral of the ambient dose equivalent rate (ADER) at the technical site was evaluated by the method of time series decomposition. Three components of time series were identified: trend, seasonal and residual. The trend of the ADER integral over the technical site is a monotonic decreasing function, where the initial and final values differ tenfold. Taking into account that 137 Cs dominates the radiation situation on-site, it is clear that the ADER due to the radionuclide decay will have decreased by 1.4 times. It is estimated that only a small proportion of 137 Cs has migrated off-site. Therefore, approximately a sevenfold decrease in dose rate is mainly due to remediation activities of personnel. During the year, the seasonal component varies the ADER integral by a factor of two, due to snowfall. The residual component reflects the uncertainty of the ADER integral calculation and phases of active SNF and RW management. The methods developed are used to support the optimization of remediation work as well as regulatory supervision of occupational radiation protection.
Padberg, Frank; Kumpf, Ulrike; Mansmann, Ulrich; Palm, Ulrich; Plewnia, Christian; Langguth, Berthold; Zwanzger, Peter; Fallgatter, Andreas; Nolden, Jana; Burger, Max; Keeser, Daniel; Rupprecht, Rainer; Falkai, Peter; Hasan, Alkomiet; Egert, Silvia; Bajbouj, Malek
2017-12-01
Transcranial direct current stimulation (tDCS) has been proposed as novel treatment for major depressive disorder (MDD) based on clinical pilot studies as well as randomized controlled monocentric trials. The DepressionDC trial is a triple-blind (blinding of rater, operator and patient), randomized, placebo controlled multicenter trial investigating the efficacy and safety of prefrontal tDCS used as additive treatment in MDD patients who have not responded to selective serotonin reuptake inhibitors (SSRI). At 5 study sites, 152 patients with MDD receive a 6-weeks treatment with active tDCS (anode F3 and cathode F4, 2 mA intensity, 30 min/day) or sham tDCS add-on to a stable antidepressant medication with an SSRI. Follow-up visits are at 3 and 6 months after the last tDCS session. The primary outcome measure is the change of the Montgomery-Asberg Depression Rating Scale (MADRS) scores at week 6 post-randomisation compared to baseline. Secondary endpoints also cover other psychopathological domains, and a comprehensive safety assessment includes measures of cognition. Patients undergo optional investigations comprising genetic testing and functional magnetic resonance imaging (fMRI) of structural and functional connectivity. The study uses also an advanced tDCS technology including standard electrode positioning and recording of technical parameters (current, impedance, voltage) in every tDCS session. Aside reporting the study protocol here, we present a novel approach for monitoring technical parameters of tDCS which will allow quality control of stimulation and further analysis of the interaction between technical parameters and clinical outcome. The DepressionDC trial will hopefully answer the important clinical question whether prefrontal tDCS is a safe and effective antidepressant intervention in patients who have not sufficiently responded to SSRIs. ClinicalTrials.gov Identifier NCT0253016.
NASA Technical Reports Server (NTRS)
1975-01-01
A system analysis of the shuttle orbiter baseline system management (SM) computer function is performed. This analysis results in an alternative SM design which is also described. The alternative design exhibits several improvements over the baseline, some of which are increased crew usability, improved flexibility, and improved growth potential. The analysis consists of two parts: an application assessment and an implementation assessment. The former is concerned with the SM user needs and design functional aspects. The latter is concerned with design flexibility, reliability, growth potential, and technical risk. The system analysis is supported by several topical investigations. These include: treatment of false alarms, treatment of off-line items, significant interface parameters, and a design evaluation checklist. An in-depth formulation of techniques, concepts, and guidelines for design of automated performance verification is discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weiner, Ruth F.; Blink, James A.; Rechard, Robert Paul
This report examines the current policy, legal, and regulatory framework pertaining to used nuclear fuel and high level waste management in the United States. The goal is to identify potential changes that if made could add flexibility and possibly improve the chances of successfully implementing technical aspects of a nuclear waste policy. Experience suggests that the regulatory framework should be established prior to initiating future repository development. Concerning specifics of the regulatory framework, reasonable expectation as the standard of proof was successfully implemented and could be retained in the future; yet, the current classification system for radioactive waste, including hazardousmore » constituents, warrants reexamination. Whether or not consideration of multiple sites are considered simultaneously in the future, inclusion of mechanisms such as deliberate use of performance assessment to manage site characterization would be wise. Because of experience gained here and abroad, diversity of geologic media is not particularly necessary as a criterion in site selection guidelines for multiple sites. Stepwise development of the repository program that includes flexibility also warrants serious consideration. Furthermore, integration of the waste management system from storage, transportation, and disposition, should be examined and would be facilitated by integration of the legal and regulatory framework. Finally, in order to enhance acceptability of future repository development, the national policy should be cognizant of those policy and technical attributes that enhance initial acceptance, and those policy and technical attributes that maintain and broaden credibility.« less
NASA Astrophysics Data System (ADS)
Chan, S.; Billesbach, D. P.; Hanson, C. V.; Biraud, S.
2014-12-01
The AmeriFlux quality assurance and quality control (QA/QC) technical team conducts short term (<2 weeks) intercomparisons using a portable eddy covariance system (PECS) to maintain high quality data observations and data consistency across the AmeriFlux network (http://ameriflux.lbl.gov/). Site intercomparisons identify discrepancies between the in situ and portable measurements and calculated fluxes. Findings are jointly discussed by the site staff and the QA/QC team to improve in the situ observations. Despite the relatively short duration of an individual site intercomparison, the accumulated record of all site visits (numbering over 100 since 2002) is a unique dataset. The ability to deploy redundant sensors provides a rare opportunity to identify, quantify, and understand uncertainties in eddy covariance and ancillary measurements. We present a few specific case studies from QA/QC site visits to highlight and share new and relevant findings related to eddy covariance instrumentation and operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wadsworth, Donald K.; Hicks, Allison H.
2012-07-01
In May, 2011 New World Environmental Inc. was awarded a contract by the Navajo Nation Environmental Protection Agency to remediate an illegal radioactive waste disposal site located in the Navajo Nation. The initial scope included the excavation and shipment of an estimated 3,000 cubic yards of Uranium mine tailings and associated industrial waste. In this instance Stakeholders were supportive of the project, remediation and restoration, yet the movement of residual radioactive materials through tribal communities was a controversial issue. Other Stakeholder issues included site security, water sources for remediation activities, local residents' temporary re-location and care of livestock, right ofmore » way permissions and local workforce development. This presentation recaps the technical and non-technical issues encountered in the remediation and restoration the seven acre site and the outreach to surrounding communities. Cultural and equity issues resulting from historical problems associated with this and other sites in the immediate area and education and training. (authors)« less
2. SITE BUILDING 002 SCANNER BUILDING VIEW IS ...
2. SITE BUILDING 002 - SCANNER BUILDING - VIEW IS LOOKING NORTH 80° WEST "B" FACE ALONG BUILDING "A" FACE. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
36. SITE BUILDING 004 ELECTRIC POWER STATION CLOSE ...
36. SITE BUILDING 004 - ELECTRIC POWER STATION - CLOSE UP VIEW OF 1200 HORSEPOWER STANDBY POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
37. SITE BUILDING 004 ELECTRIC POWER STATION ELEVATED ...
37. SITE BUILDING 004 - ELECTRIC POWER STATION - ELEVATED VIEW OF FIVE (5) 1200 HORSEPOWER STANDBY - POWER DIESEL ENGINE/GENERATOR SETS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
23. SITE BUILDING 002 SCANNER BUILDING RADAR CONTROL ...
23. SITE BUILDING 002 - SCANNER BUILDING - RADAR CONTROL INTERFACE "RCL NO. 2" WITH COMPUTER CONTROL DISC DRIVE UNITS IN FOREGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
Minnesota Frameworks for Career and Technical Education
ERIC Educational Resources Information Center
Minnesota Department of Education, 2004
2004-01-01
This framework provides tools for determining how national and industry standards align with goals and curriculum in Career and Technical Education (CTE) programs. The examples, alignment charts, and ideas for activities contained in this document are intended to encourage districts, sites, and teachers to use, adapt, and develop their own best…
Surprising Beauty in Technical Photography
ERIC Educational Resources Information Center
Davidhazy, Andrew
2009-01-01
The Imaging and Photographic Technology area, in which the author teaches, is an applications- and technology-oriented photography program designed to prepare students for work in technical, corporate, industrial, and scientific environments. One day, the author received an e-mail message from an editor who had found his Web site and thought he…
This report summarizes a variety of significant projects that the ETSC, located in the Land Remediation and Pollution Control Division (LRPCD), National Risk Management Research Laboratory (NRMRL), has supported throughout fiscal year 2013. Projects have addressed an array of env...
76 FR 16531 - Technical Correction for Neurological Listing Cross-Reference
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
... 1-800-325-0778, or visit our Internet site, Social Security Online, at http://www.socialsecurity.gov... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 404 [Docket No. SSA-2011-0019] RIN 0960-AH33 Technical Correction for Neurological Listing Cross-Reference AGENCY: Social Security Administration. ACTION: Final...
Publications | Research Site Name | NREL
Article Title, Journal Name (Year) Conference Paper Title, Conference Name (Year) Report Title, NREL Technical Report (Year) Topic 2 Article Title, Journal Name (Year) Conference Paper Title, Conference Name (Year) Report Title, NREL Technical Report (Year) Topic 3 Article Title, Journal Name (Year) Conference
76 FR 19095 - Meeting of the Mobile Sources Technical Review Subcommittee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-06
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9290-8] Meeting of the Mobile Sources Technical Review... Federal Advisory Committee Act, Public Law 92- 463, notice is hereby given that the Mobile Sources... Subcommittee's Web site: http://www.epa.gov/air/caaac/mobile_sources.html . MSTRS listserver subscribers will...
Borenstein, Meredith S.; Golet, Francis C.; Armstrong, David S.; Breault, Robert F.; McCobb, Timothy D.; Weiskel, Peter K.
2012-01-01
The Rhode Island Water Resources Board planned to develop public water-supply wells in the Big River Management Area in Kent County, Rhode Island. Research in the United States and abroad indicates that groundwater withdrawal has the potential to affect wetland hydrology and related processes. In May 2008, the Rhode Island Water Resources Board, the U.S. Geological Survey, and the University of Rhode Island formed a partnership to establish baseline conditions at selected Big River wetland study sites and to develop an approach for monitoring potential impacts once pumping begins. In 2008 and 2009, baseline data were collected on the hydrology, vegetation, and soil characteristics at five forested wetland study sites in the Big River Management Area. Four of the sites were located in areas of potential drawdown associated with the projected withdrawals. The fifth site was located outside the area of projected drawdown and served as a control site. The data collected during this study are presented in this report.
USDI DCS technical support: Mississippi Test Facility
NASA Technical Reports Server (NTRS)
Preble, D. M.
1975-01-01
The objective of the technical support effort is to provide hardware and data processing support to DCS users so that application of the system may be simply and effectively implemented. Technical support at Mississippi Test Facility (MTF) is concerned primarily with on-site hardware. The first objective of the DCP hardware support was to assure that standard measuring apparatus and techniques used by the USGS could be adapted to the DCS. The second objective was to try to standardize the miscellaneous variety of parameters into a standard instrument set. The third objective was to provide the necessary accessories to simplify the use and complement the capabilities of the DCP. The standard USGS sites have been interfaced and are presently operating. These sites are stream gauge, ground water level and line operated quality of water. Evapotranspiration, meteorological and battery operated quality of water sites are planned for near future DCP operation. Three accessories which are under test or development are the Chu antenna, solar power supply and add-on memory. The DCP has proven to be relatively easy to interface with many monitors. The large antenna is awkward to install and transport. The DCS has met the original requirements well; it has and is proving that an operation, satellite-based data collection system is feasible.
Raskin, Daniel; Khaitovich, Boris; Balan, Shmuel; Silverberg, Daniel; Halak, Moshe; Rimon, Uri
2018-01-01
To assess the technical success of the Outback reentry device in contralateral versus ipsilateral approaches for femoropopliteal arterial occlusion. A retrospective review of patients treated for critical limb ischemia (CLI) using the Outback between January 2013 and July 2016 was performed. Age, gender, length and site of the occlusion, approach site, aortic bifurcation angle, and reentry site were recorded. Calcification score was assigned at both aortic bifurcation and reentry site. Technical success was assessed. During the study period, a total of 1300 endovascular procedures were performed on 489 patients for CLI. The Outback was applied on 50 femoropopliteal chronic total occlusions. Thirty-nine contralateral and 11 ipsilateral antegrade femoral were accessed. The device was used successfully in 41 patients (82%). There were nine failures, all in the contralateral approach group. Six due to inability to deliver the device due to acute aortic bifurcation angle and three due to failure to achieve luminal reentry. Procedural success was significantly affected by the aortic bifurcation angle (p = 0.013). The Outback has high technical success rates in treatment of femoropopliteal occlusion, when applied from either an ipsi- or contralateral approach. When applied in contralateral access, acute aortic bifurcation angle predicts procedural failure.
EPA waiver of ground water cleanup standards in NY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hess, A.A.
1995-11-01
EPA may invoke a technical impracticability (TI) waiver at a site when the Agency determines that it is technically impracticable from an engineering perspective to attain cleanup standards within a reasonable time period. The October 6, 1994 TI waiver of ground water cleanup standards at the G.E./Moreau Superfund Site in New York is the first post-Record of Decision (ROD) TI waiver granted by EPA since issuance of the September 1993 guidance on technical impracticability of ground water restoration. In the 1987 ROD, EPA selected natural gradient flushing and treatment as the ground water remedy and estimated that TCE-contaminated ground watermore » within the unconsolidated aquifer at the Site would be restored to drinking water quality within decades. EPA`s subsequent reevaluation showed that cleanup of the ground water would take 200 years or more, regardless of the remedial technology employed, due to the presence of site-specific physical and chemical factors that limit the effectiveness of ground water remediation technologies. Following public participation activities, EPA issued the TI waiver as an Explanation of Significant Differences (ESD) to the ROD. The ESD revised the time frame expected for ground water restoration but did not reduce or change any of the required cleanup actions.« less
77 FR 9219 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-16
...: Office of Scientific and Technical Information, 1 Science.gov Way, Oak Ridge, Tennessee 37830. FOR... email: [email protected]gov or check the Web site at www.oakridge.doe.gov/em/ssab . SUPPLEMENTARY... be available at the following Web site: http://www.oakridge.doe.gov/em/ssab/minutes.htm . Issued at...
The Management of the Scientific Information Environment: The Role of the Research Library Web Site.
ERIC Educational Resources Information Center
Arte, Assunta
2001-01-01
Describes the experiences of the Italian National Research Council Library staff in the successful development and implementation of its Web site. Discusses electronic information sources that interface with the Web site; library services; technical infrastructure; and the choice of a Web-based library management system. (Author/LRW)
A Neophyte Constructs a Web Site: Lessons Learned.
ERIC Educational Resources Information Center
Bent, Devin
1998-01-01
A political science professor at James Madison University (VA) constructed a Web page to support an undergraduate course in government. This article defines Web-site goals and audience, reviews other sites, and discusses organization of Web links and technical choices for HTML editor, page layout and use of image, audio, and video files. Stresses…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-16
... technical support for the production of computer software. The company reports that workers leased from Affiliated Computer Services, Inc., (ACS) were employed on-site at the Provo, Utah location of Novell, Inc... On-Site Leased Workers From Affiliated Computer Services, Inc., (ACS), Provo, UT; Amended...
Web vulnerability study of online pharmacy sites.
Kuzma, Joanne
2011-01-01
Consumers are increasingly using online pharmacies, but these sites may not provide an adequate level of security with the consumers' personal data. There is a gap in this research addressing the problems of security vulnerabilities in this industry. The objective is to identify the level of web application security vulnerabilities in online pharmacies and the common types of flaws, thus expanding on prior studies. Technical, managerial and legal recommendations on how to mitigate security issues are presented. The proposed four-step method first consists of choosing an online testing tool. The next steps involve choosing a list of 60 online pharmacy sites to test, and then running the software analysis to compile a list of flaws. Finally, an in-depth analysis is performed on the types of web application vulnerabilities. The majority of sites had serious vulnerabilities, with the majority of flaws being cross-site scripting or old versions of software that have not been updated. A method is proposed for the securing of web pharmacy sites, using a multi-phased approach of technical and managerial techniques together with a thorough understanding of national legal requirements for securing systems.
Measurement of horizontal motions in Alaska using very long baseline interferometry
NASA Technical Reports Server (NTRS)
Ma, C.; Sauber, J. M.; Clark, T. A.; Ryan, J. W.; Bell, L. J.; Gordon, D.; Himwich, W. E.
1990-01-01
Results are presented on an analysis of VLBI measurements performed between 1984 and 1990 by means of a network of 53 sites in Alaska, the Yukon Territory, and the conterminous United States to determine the extent of horizontal motions in Alaska. Results are presented in two ways, one showing the evolution of individual baselines and the other yielding site velocities; both approaches use VLBI data from other permanent stations in order to define a global reference frame. It was found that VLBI sites within the Alaska-Aleutian subduction boundary zone (Yakataga, Kodiak, and Sand Point) had higher instantaneous velocities relative to eastern North America than the interior sites of Alaska. The results of Yakataga data modeling suggests that the observed motion is the result of elastic straining of the overriding plate due to a locked main thrust zone with a component of oblique slip.
Future prospects for measurements of mass hierarchy and CP violation
NASA Astrophysics Data System (ADS)
Lang, Karol
2015-03-01
We present a brief overview of current plans to pursue two challenging goals, resolution of the neutrino mass hierarchy and determination of the CP phase of the PMNS neutrino mixing matrix. Future prospects include large atmospheric experiments, PINGU, ORCA, and INO-ICAL, medium baseline reactor experiments, JUNO and RENO- 50, and long baseline accelerator experiments, LBNE, LBNO, and Hyper-Kamiokande. There are also new initiatives emerging, ESSνSB at the European Spallation Source, and CHIPS in the NuMI neutrino beam. This is a multifaceted, vigorous, and technically difficult world-wide program. It will likely take more than a decade to start reaping its benefits.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ender, R.L.; Gorski, S.
1981-10-01
The report consists of an update to the Anchorage socioeconomic and physical baseline and infrastructure standards used to forecast impacts with and without OCS oil and gas development in Alaska. This material is found in Technical Report 43, Volumes 1 and 2 entitled 'Gulf of Alaska and Lower Cook Inlet Petroleum Development Scenarios, Anchorage Socioeconomic and Physical Baseline and Anchorage Impact Analysis.' These updates should be read in conjunction with the above report. In addition, the Anchorage base case and petroleum development scenarios for the St. George Basin are given. These sections are written to stand alone without reference.
Internal dosimetry technical basis manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-12-20
The internal dosimetry program at the Savannah River Site (SRS) consists of radiation protection programs and activities used to detect and evaluate intakes of radioactive material by radiation workers. Examples of such programs are: air monitoring; surface contamination monitoring; personal contamination surveys; radiobioassay; and dose assessment. The objectives of the internal dosimetry program are to demonstrate that the workplace is under control and that workers are not being exposed to radioactive material, and to detect and assess inadvertent intakes in the workplace. The Savannah River Site Internal Dosimetry Technical Basis Manual (TBM) is intended to provide a technical and philosophicalmore » discussion of the radiobioassay and dose assessment aspects of the internal dosimetry program. Detailed information on air, surface, and personal contamination surveillance programs is not given in this manual except for how these programs interface with routine and special bioassay programs.« less
Baseline coral disease surveys within three marine parks in Sabah, Borneo.
Miller, Jennifer; Sweet, Michael J; Wood, Elizabeth; Bythell, John
2015-01-01
Two of the most significant threats to coral reefs worldwide are bleaching and disease. However, there has been a scarcity of research on coral disease in South-East Asia, despite the high biodiversity and the strong dependence of local communities on the reefs in the region. This study provides baseline data on coral disease frequencies within three national parks in Sabah, Borneo, which exhibit different levels of human impacts and management histories. High mean coral cover (55%) and variable disease frequency (mean 0.25 diseased colonies m(-2)) were found across the three sites. Highest disease frequency (0.44 diseased colonies per m(2)) was seen at the site closest to coastal population centres. Bleaching and pigmentation responses were actually higher at Sipadan, the more remote, offshore site, whereas none of the other coral diseases detected in the other two parks were detected in Sipadan. Results of this study offer a baseline dataset of disease in these parks and indicate the need for continued monitoring, and suggest that coral colonies in parks under higher anthropogenic stressors and with lower coral cover may be more susceptible to contracting disease.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolf, S.K.; Dixon, T.H.; Freymueller, J.T.
1990-04-01
Geodetic monitoring of subduction of the Nazca and Cocos plates is a goal of the CASA (Central and South America) Global Positioning System (GPS) experiments, and requires measurement of intersite distances (baselines) in excess of 500 km. The major error source in these measurements is the uncertainty in the position of the GPS satellites at the time of observation. A key aspect of the first CASA experiment, CASA Uno, was the initiation of a global network of tracking stations minimize these errors. The authors studied the effect of using various subsets of this global tracking network on long (>100 km)more » baseline estimates in the CASA region. Best results were obtained with a global tracking network consisting of three U.S. fiducial stations, two sites in the southwest pacific and two sites in Europe. Relative to smaller subsets, this global network improved baseline repeatability, resolution of carrier phase cycle ambiguities, and formal errors of the orbit estimates. Describing baseline repeatability for horizontal components as {sigma}=(a{sup 2} + b{sup 2}L{sup 2}){sup 1/2} where L is baseline length, the authors obtained a = 4 and 9 mm and b = 2.8{times}10{sup {minus}8} and 2.3{times}10{sup {minus}8} for north and east components, respectively, on CASA baselines up to 1,000 km in length with this global network.« less
DOT National Transportation Integrated Search
2007-11-13
This document presents the findings from the baseline phase of the evaluation of the process being used by eight sites to develop a design for a Travel Management Coordination Center (TMCC) for improved coordination of human service transportation wi...
USDA-ARS?s Scientific Manuscript database
Tropical insect biodiversity remains largely unknown for most research sites in the world, due to the overwhelming number of species and lack of focus by taxonomists. Single-site studies are necessary, however to establish baselines for comparative studies across space, and as the basis for ecologic...
Mitsumoto, Hiroshi; Factor-Litvak, Pam; Andrews, Howard; Goetz, Raymond R; Andrews, Leslie; Rabkin, Judith G; McElhiney, Martin; Nieves, Jeri; Santella, Regina M; Murphy, Jennifer; Hupf, Jonathan; Singleton, Jess; Merle, David; Kilty, Mary; Heitzman, Daragh; Bedlack, Richard S; Miller, Robert G; Katz, Jonathan S; Forshew, Dallas; Barohn, Richard J; Sorenson, Eric J; Oskarsson, Bjorn; Fernandes Filho, J Americo M; Kasarskis, Edward J; Lomen-Hoerth, Catherine; Mozaffar, Tahseen; Rollins, Yvonne D; Nations, Sharon P; Swenson, Andrea J; Shefner, Jeremy M; Andrews, Jinsy A; Koczon-Jaremko, Boguslawa A
2014-06-01
Abstract In a multicenter study of newly diagnosed ALS patients without a reported family history of ALS, we are prospectively investigating whether markers of oxidative stress (OS) are associated with disease progression. Methods utilize an extensive structured telephone interview ascertaining environmental, lifestyle, dietary and psychological risk factors associated with OS. Detailed assessments were performed at baseline and at 3-6 month intervals during the ensuing 30 months. Our biorepository includes DNA, plasma, urine, and skin. Three hundred and fifty-five patients were recruited. Subjects were enrolled over a 36-month period at 16 sites. To meet the target number of subjects, the recruitment period was prolonged and additional sites were included. Results showed that demographic and disease characteristics were similar between 477 eligible/non-enrolled and enrolled patients, the only difference being type of health insurance among enrolled patients. Sites were divided into three groups by the number of enrolled subjects. Comparing these three groups, the Columbia site had fewer 'definite ALS' diagnoses. This is the first prospective, interdisciplinary, in-depth, multicenter epidemiological investigation of OS related to ALS progression and has been accomplished by an aggressive recruitment process. The baseline demographic and disease features of the study sample are now fully characterized.
Sirintrapun, Sahussapont Joseph; Rudomina, Dorota; Mazzella, Allix; Feratovic, Rusmir; Alago, William; Siegelbaum, Robert; Lin, Oscar
2017-01-01
Background: The first satellite center to offer interventional radiology procedures at Memorial Sloan Kettering Cancer Center opened in October 2014. Two of the procedures offered, fine needle aspirations and core biopsies, required rapid on-site cytologic evaluation of smears and biopsy touch imprints for cellular content and adequacy. The volume and frequency of such evaluations did not justify hiring on-site cytotechnologists, and therefore, a dynamic robotic telecytology (TC) solution was created. In this technical article, we present a detailed description of our implementation of robotic TC. Methods: Pathology devised the remote robotic TC solution after acknowledging that it would not be cost effective to staff cytotechnologists on-site at the satellite location. Sakura VisionTek was selected as our robotic TC solution. In addition to configuration of the dynamic robotic TC solution, pathology realized integrating the technology solution into operations would require a multidisciplinary effort and reevaluation of existing staffing and workflows. Results: Extensively described are the architectural framework and multidisciplinary process re-design, created to navigate the constraints of our technical, cultural, and organizational environment. Also reviewed are the benefits and challenges associated with available desktop sharing solutions, particularly accounting for information security concerns. Conclusions: Dynamic robotic TC is effective for immediate evaluations performed without on-site cytotechnology staff. Our goal is providing an extensive perspective of the implementation process, particularly technical, cultural, and operational constraints. Through this perspective, our template can serve as an extensible blueprint for other centers interested in implementing robotic TC without on-site cytotechnologists. PMID:28966832
Sirintrapun, Sahussapont Joseph; Rudomina, Dorota; Mazzella, Allix; Feratovic, Rusmir; Alago, William; Siegelbaum, Robert; Lin, Oscar
2017-01-01
The first satellite center to offer interventional radiology procedures at Memorial Sloan Kettering Cancer Center opened in October 2014. Two of the procedures offered, fine needle aspirations and core biopsies, required rapid on-site cytologic evaluation of smears and biopsy touch imprints for cellular content and adequacy. The volume and frequency of such evaluations did not justify hiring on-site cytotechnologists, and therefore, a dynamic robotic telecytology (TC) solution was created. In this technical article, we present a detailed description of our implementation of robotic TC. Pathology devised the remote robotic TC solution after acknowledging that it would not be cost effective to staff cytotechnologists on-site at the satellite location. Sakura VisionTek was selected as our robotic TC solution. In addition to configuration of the dynamic robotic TC solution, pathology realized integrating the technology solution into operations would require a multidisciplinary effort and reevaluation of existing staffing and workflows. Extensively described are the architectural framework and multidisciplinary process re-design, created to navigate the constraints of our technical, cultural, and organizational environment. Also reviewed are the benefits and challenges associated with available desktop sharing solutions, particularly accounting for information security concerns. Dynamic robotic TC is effective for immediate evaluations performed without on-site cytotechnology staff. Our goal is providing an extensive perspective of the implementation process, particularly technical, cultural, and operational constraints. Through this perspective, our template can serve as an extensible blueprint for other centers interested in implementing robotic TC without on-site cytotechnologists.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 1980) (CERCLA or Superfund) was enacted to provide a program for identifying and responding to releases of hazardous substances into the environment. The Superfund Amendments and Reauthorization Act (SARA, 1986) was enacted to strengthen CERCLA by requiring that site clean-ups be permanent, and that they use treatments that significantly reduce the volume, toxicity, or mobility of hazardous pollutants. The National Oil and Hazardous Substances Pollution Contingency Plan (NCP) (USEPA, 1985; USEPA, 1990) implements the CERCLA statute, presenting a process for (1) identifying and prioritizing sites requiring remediation and (2) assessing themore » extent of remedial action required at each site. The process includes performing two studies: a Remedial Investigation (RI) to evaluate the nature, extent, and expected consequences of site contamination, and a Feasibility Study (FS) to select an appropriate remedial alternative adequate to reduce such risks to acceptable levels. An integral part of the RI is the evaluation of human health risks posed by hazardous substance releases. This risk evaluation serves a number of purposes within the overall context of the RI/FS process, the most essential of which is to provide an understanding of ``baseline`` risks posed by a given site. Baseline risks are those risks that would exist if no remediation or institutional controls are applied at a site. This document was written to (1) guide risk assessors through the process of interpreting EPA BRA policy and (2) help risk assessors to discuss EPA policy with regulators, decision makers, and stakeholders as it relates to conditions at a particular DOE site.« less
Loyola Briceno, Ana Carolina; Kawatu, Jennifer; Saul, Katie; DeAngelis, Katie; Frederiksen, Brittni; Moskosky, Susan B; Gavin, Lorrie
2017-09-01
The objective was to describe a Performance Measure Learning Collaborative (PMLC) designed to help Title X family planning grantees use new clinical performance measures for contraceptive care. Twelve Title X grantee-service site teams participated in an 8-month PMLC from November 2015 to June 2016; baseline was assessed in October 2015. Each team documented their selected best practices and strategies to improve performance, and calculated the contraceptive care performance measures at baseline and for each of the subsequent 8 months. PMLC sites implemented a mix of best practices: (a) ensuring access to a broad range of methods (n=7 sites), (b) supporting women through client-centered counseling and reproductive life planning (n=8 sites), (c) developing systems for same-day provision of all methods (n=10 sites) and (d) utilizing diverse payment options to reduce cost as a barrier (n=4 sites). Ten sites (83%) observed an increase in the clinical performance measures focused on most and moderately effective methods (MME), with a median percent change of 6% for MME (from a median of 73% at baseline to 77% post-PMLC). Evidence suggests that the PMLC model is an approach that can be used to improve the quality of contraceptive care offered to clients in some settings. Further replication of the PMLC among other groups and beyond the Title X network will help strengthen the current model through lessons learned. Using the performance measures in the context of a learning collaborative may be a useful strategy for other programs (e.g., Federally Qualified Health Centers, Medicaid, private health plans) that provide contraceptive care. Expanded use of the measures may help increase access to contraceptive care to achieve national goals for family planning. Published by Elsevier Inc.
ATS-6 - Technical aspects of the Health/Education Telecommunications Experiment
NASA Technical Reports Server (NTRS)
Boor, J. L.; Braunstein, J.; Janky, J. M.; Ogden, D.; Potter, J. G.; Harper, E. L.; Volkmer, E.; Whalen, A. A.; Henderson, E.; Hupe, H. H.
1975-01-01
An overview is given of the HET experiment on ATS-6. The paper is divided into nine parts, including a technical overview, a preliminary evaluation of the HET demonstration, a review of operations at the Denver uplink terminal, a discussion of remote ground terminals, a review of C-band comprehensive terminals and of S-band comprehensive terminals, and parts devoted to general network operations, technical management and effectiveness of the network, and the site equipment operator.
TECHNICAL APPROACHES TO CHARACTERIZING AND CLEANUP OF AUTOMOTIVE RECYCLING BROWNFIELDS
The guidance document gives assistance to communities, decision-makers, states and municipalities, academia, and the private sector to address issues related to the redevelopment of Brownfields sites, specifically automotive recycling sites. The document helps users to understand...
35. SITE BUILDING 004 ELECTRIC POWER STATION CONTROL ...
35. SITE BUILDING 004 - ELECTRIC POWER STATION - CONTROL ROOM OF ELECTRIC POWER STATION WITH DIESEL ENGINE POWERED ELECTRIC GENERATION EQUIPMENT IN BACKGROUND. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
38. SITE BUILDING 004 ELECTRIC POWER STATION AT INTERIOR ...
38. SITE BUILDING 004 - ELECTRIC POWER STATION AT INTERIOR - OBLIQUE VIEW AT FLOOR LEVEL SHOWING DIESEL ENGINE/GENERATOR SET NUMBER 5. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weng Meijui; Chen, Matt Chiung-Yu, E-mail: jjychen@gmail.com; Chi Wenche
2011-04-15
The current study retrospectively evaluated whether endovascular revascularization of chronically thrombosed and long-discarded vascular access sites for hemodialysis was feasible. Technical and clinical success rates, postintervention primary and secondary patency rates, and complications were reported. During a 1-year period, we reviewed a total of 924 interventions performed for dysfunction and/or failed hemodialysis vascular access sites and permanent catheters in 881 patients. In patients whose vascular access-site problems were considered untreatable or were considered treatable with a high risk of failure and access-site abandonment, we attempted to revascularize (resurrect) the chronically occluded and long-discarded (mummy) vascular access sites. We attempted tomore » resurrect a total of 18 mummy access sites (mean age 46.6 {+-} 38.7 months; range 5-144) in 15 patients (8 women and 7 men; mean age 66.2 {+-} 11.5 years; age range 50-85) and had an overall technical success rate of 77.8%. Resurrection failure occurred in 3 fistulas and in 1 straight graft. The clinical success rate was 100% at 2 months after resurrection. In the 14 resurrected vascular access sites, 6 balloon-assisted maturation procedures were required in 5 fistulas; after access-site maturation, a total of 22 interventions were performed to maintain access-site patency. The mean go-through time for successful resurrection procedures was 146.6 {+-} 34.3 min (range 74-193). Postmaturation primary patency rates were 71.4 {+-} 12.1% at 30 days, 57.1 {+-} 13.2% at 60 days, 28.6 {+-} 13.4% at 90 days, and 19 {+-} 11.8% at 180 days. Postmaturation secondary patency rates were 100% at 30, 60, and 90 days and 81.8 {+-} 11.6% at 180 days. There were 2 major complications consisting of massive venous ruptures in 2 mummy access sites during balloon dilation; in both cases, prolonged balloon inflation failed to achieve hemostasis, but percutaneous N-butyl cyanoacrylate glue seal-off was performed successfully. Percutaneous resurrection of mummy vascular access sites for hemodialysis is technically feasible with high clinical success rates. In selected patients, resurrection of mummy access sites provides long-discarded access sites one more chance to be used for hemodialysis in an effort to preserve potential extremity sites for future access-site placement and to prevent long-term catheter indwelling.« less
Multifamily Group Psychoeducation in New York State: Implementation and Fidelity Outcomes.
Kealey, Edith M; Leckman-Westin, Emily; Jewell, Thomas C; Finnerty, Molly T
2015-11-01
The study examined implementation outcomes from a large state initiative to support dissemination of multifamily group (MFG) psychoeducation in outpatient mental health settings. Thirty-one sites participated in the project. Baseline training in the MFG model was followed by monthly expert consultation delivered in either a group (16 sites) or individual format (15 sites). Research staff assessed fidelity to the MFG model by telephone at baseline and 12, 18, and 24 months and documented time to completion of three key milestones: holding a family joining session, a family educational workshop, and an MFG meeting. Intent-to-train analyses found that 12 sites (39%) achieved high fidelity to the MFG model, and 20 (65%) achieved moderate or high fidelity. Mean scores on the Family Psychoeducation Fidelity Assessment Scale increased over time. Twenty-five sites (81%) conducted at least one joining session, and 20 (65%) conducted at least one MFG. Mean±SD time from baseline to the first group was 11.75±4.78 months. Programs that held the first joining session within four to 12 months after training were significantly more likely than programs that did not to conduct a group (p<.05). No significant differences were found by consultation format. Implementation of moderate- to high-fidelity MFG programs in routine outpatient mental health settings is feasible. Sites that moved very quickly or very slowly in early implementation stages were less likely to be successful in conducting an MFG. More research on the efficiency and effectiveness of consultation formats is needed to guide future implementation efforts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Diefenderfer, Heida L.; Thom, Ronald M.; Borde, Amy B.
This report is the second annual report of a six-year project to evaluate the cumulative effects of habitat restoration projects in the Columbia River Estuary, conducted by Pacific Northwest National Laboratory's Marine Sciences Laboratory, NOAA's National Marine Fisheries Service Pt. Adams Biological Field Station, and the Columbia River Estuary Study Taskforce for the US Army Corps of Engineers. In 2005, baseline data were collected on two restoration sites and two associated reference sites in the Columbia River estuary. The sites represent two habitat types of the estuary--brackish marsh and freshwater swamp--that have sustained substantial losses in area and that maymore » play important roles for salmonids. Baseline data collected included vegetation and elevation surveys, above and below-ground biomass, water depth and temperature, nutrient flux, fish species composition, and channel geometry. Following baseline data collection, three kinds of restoration actions for hydrological reconnection were implemented in several locations on the sites: tidegate replacements (2) at Vera Slough, near the city of Astoria in Oregon State, and culvert replacements (2) and dike breaches (3) at Kandoll Farm in the Grays River watershed in Washington State. Limited post-restoration data were collected: photo points, nutrient flux, water depth and temperature, and channel cross-sections. In subsequent work, this and additional post-restoration data will be used in conjunction with data from other sites to estimate net effects of hydrological reconnection restoration projects throughout the estuary. This project is establishing methods for evaluating the effectiveness of individual projects and a framework for assessing estuary-wide cumulative effects including a protocol manual for monitoring restoration and reference sites.« less
Mariano, Abigail D; Penninck, Dominique G; Sutherland-Smith, James; Kudej, Raymond K
2018-05-01
OBJECTIVE To describe the ultrasonographic appearance of the urinary bladder incision site in dogs that underwent cystotomy for treatment of urolithiasis. DESIGN Prospective, longitudinal study. ANIMALS 18 client-owned dogs. PROCEDURES Dogs underwent urinary bladder ultrasonography at baseline (≤ 1 day before surgery) and at 1 day and approximately 2, 6, and 12 weeks after cystotomy for urocystolith removal. A baseline ratio between ventral (cystotomy site) and corresponding dorsal midline wall thickness was calculated and used to account for measurement variations attributable to bladder distension at subsequent visits. Patient signalment, weight, medications administered, urocystolith composition, and culture results were recorded. Clinical signs, reoccurrence of hyperechoic foci, and suture visualization were recorded at follow-up examinations. Variables were evaluated for association with cystotomy site thickening and resolution of thickening. RESULTS Median wall thickness at the ventral aspect of the bladder was significantly greater than that of the corresponding dorsal aspect at baseline. Cystotomy site thickening peaked 1 day after surgery and decreased at subsequent visits in a linear manner. Twelve weeks after surgery, 5 of 10 clinically normal dogs evaluated had persistent cystotomy site thickening. Eleven of 18 dogs had reoccurrence of hyperechoic foci within the bladder at some time during the study (median time to first detection, 17 days after surgery). CONCLUSIONS AND CLINICAL RELEVANCE Persistent cystotomy site thickening can be present up to 3 months after cystotomy for urolithiasis in dogs without lower urinary tract signs. Reoccurrence of hyperechoic foci in the bladder, although subclinical, was detected earlier and at a higher rate than anticipated.
Update on ORNL TRANSFORM Tool: Simulating Multi-Module Advanced Reactor with End-to-End I&C
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hale, Richard Edward; Fugate, David L.; Cetiner, Sacit M.
2015-05-01
The Small Modular Reactor (SMR) Dynamic System Modeling Tool project is in the fourth year of development. The project is designed to support collaborative modeling and study of various advanced SMR (non-light water cooled reactor) concepts, including the use of multiple coupled reactors at a single site. The focus of this report is the development of a steam generator and drum system model that includes the complex dynamics of typical steam drum systems, the development of instrumentation and controls for the steam generator with drum system model, and the development of multi-reactor module models that reflect the full power reactormore » innovative small module design concept. The objective of the project is to provide a common simulation environment and baseline modeling resources to facilitate rapid development of dynamic advanced reactor models; ensure consistency among research products within the Instrumentation, Controls, and Human-Machine Interface technical area; and leverage cross-cutting capabilities while minimizing duplication of effort. The combined simulation environment and suite of models are identified as the TRANSFORM tool. The critical elements of this effort include (1) defining a standardized, common simulation environment that can be applied throughout the Advanced Reactors Technology program; (2) developing a library of baseline component modules that can be assembled into full plant models using available geometry, design, and thermal-hydraulic data; (3) defining modeling conventions for interconnecting component models; and (4) establishing user interfaces and support tools to facilitate simulation development (i.e., configuration and parameterization), execution, and results display and capture.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less
NASA Technical Reports Server (NTRS)
1971-01-01
The baseline preliminary design developed for the Bioexplorer spacecraft under a previous contract was used, and further study effort devoted in areas of thermal control, attitude control, and power subsystem design. The use of the space shuttle vehicle as a potential launch and recovery vehicle for the Bioresearch module was also evaluated.
Smith, Jeffrey Michael; Gupta, Shivam; Williams, Emma; Brickson, Kate; Ly Sotha, Keth; Tep, Navuth; Calibo, Anthony; Castro, Mary Christine; Marinduque, Bernabe; Hathaway, Mark
2016-12-01
To determine whether a simple quality improvement initiative consisting of a technical update and regular audit and feedback sessions will result in increased use of antenatal corticosteroids among pregnant women at risk of imminent preterm birth delivering at health facilities in the Philippines and Cambodia. Non-randomized, observational study using a pre-/post-intervention design conducted between October 2013 and June 2014. A total of 12 high volume facilities providing Emergency Obstetric and Newborn Care services in Cambodia (6) and Philippines (6). A technical update on preterm birth and use of antenatal corticosteroids, followed by monthly audit and feedback sessions. The proportion of women at risk of imminent preterm birth who received at least one dose of dexamethasone. Coverage of at least one dose of dexamethasone increased from 35% at baseline to 86% at endline in Cambodia (P < 0.0001) and from 34% at baseline to 56% at endline in the Philippines (P < 0.0001), among women who had births at 24-36 weeks. In both settings baseline coverage and magnitude of improvement varied notably by facility. Availability of dexamethasone, knowledge of use and cost were not major barriers to coverage. A simple quality improvement strategy was feasible and effective in increasing use of dexamethasone in the management of preterm birth in 12 hospitals in Cambodia and Philippines. © The Author 2016. Published by Oxford University Press in association with the International Society for Quality in Health Care.
Adjustable tongue advancement for obstructive sleep apnea: a pilot study.
Hamans, Evert; Boudewyns, An; Stuck, Boris A; Baisch, Alexander; Willemen, Marc; Verbraecken, Johan; Van de Heyning, Paul
2008-11-01
Surgical treatment of obstructive sleep apnea (OSA) caused by hypopharyngeal collapse of the upper airway can be considered in patients who are intolerant to continuous positive airway pressure (CPAP). The present procedures addressing the hypopharynx are invasive and have substantial morbidity and limited efficacy. Ten patients (mean age, 44 years) with moderate to severe OSA, ie, an apnea-hypopnea index (AHI) between 15 and 50, with CPAP intolerance were included in a prospective, nonrandomized, multicenter study to evaluate the feasibility, safety, and efficacy of a novel tongue advancement procedure. The procedure consists of the implantation of a tissue anchor in the tongue base and an adjustment spool at the mandible. Titration of this tissue anchor results in advancement of the tongue and a patent upper airway. The mean AHI decreased from 22.8 at baseline to 11.8 at the 6-month follow-up (p = 0.007). The Epworth Sleepiness Scale score decreased from 11.4 at baseline to 7.7 at the 6-month follow-up (p = 0.094), and the snoring score decreased from 7.5 at baseline to 3.9 at the 6-month follow-up (p = 0.005). Four technical adverse events were noted, and 1 clinical adverse event occurred. Adjustable tongue advancement is a feasible and relatively safe way to reduce the AHI and snoring in selected patients with moderate to severe OSA and CPAP intolerance. Technical improvements and refinements to the procedure are ongoing.
1985-86 biennial report of the EML regional baseline station at Chester, New Jersey
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chieco, N.
1988-10-01
The Environmental Measurements Laboratory (EML) has maintained a field station at Chester, NJ since 1976. Located 64 kilometers west of EML, the site is on the property of Bell Communications Research and is a little more than 900 square meters in area. The Chester site is a rural facility which provides us with an opportunity to carry out ''regional baseline'' research and to test field instruments. This report updates the various programs underway at Chester and presents data that have become available since the last report. Individual reports are processed separately for the data base.
Proceedings from the Workshop on Phytoremediation of Inorganic Contaminants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Jay Thatcher; Matthern, Gretchen Elise; Glenn, Anne Williams
The Metals and Radionuclides Product Line of the U.S. Department of Energy (DOE) Subsurface Contaminants Focus Area (SCFA) is responsible for the development of technologies and systems that reduce the risk and cost of remediation of radionuclide and hazardous metal contamination in soils and groundwater. The rapid and efficient remediation of these sites and the areas surrounding them represents a technological challenge. Phytoremediation, the use of living plants to cleanup contaminated soils, sediments, surface water and groundwater, is an emerging technology that may be applicable to the problem. The use of phytoremediation to cleanup organic contamination is widely accepted andmore » is being implemented at numerous sites. This workshop was held to initiate a discussion in the scientific community about whether phytoremediation is applicable to inorganic contaminants, such as metals and radionuclides, across the DOE complex. The Workshop on Phytoremediation of Inorganic Contaminants was held at Argonne National Laboratory from November 30 through December 2, 1999. The purpose of the workshop was to provide SCFA and the DOE Environmental Restoration Program with an understanding of the status of phytoremediation as a potential remediation technology for DOE sites. The workshop was expected to identify data gaps, technologies ready for demonstration and deployment, and to provide a set of recommendations for the further development of these technologies. More specifically, the objectives of the workshop were to: · Determine the status of the existing baseline, including technological maturation, · Identify areas for future potential research, · Identify the key issues and recommendations for issue resolution, · Recommend a strategy for maturing key aspects of phytoremediation, · Improve communication and collaboration among organizations currently involved in phytoremediation research, and · Identify technical barriers to making phytoremediation commercially successful in more areas.« less
Titano, Joseph J; Biederman, Derek M; Zech, John; Korff, Ricki; Ranade, Mona; Patel, Rahul; Kim, Edward; Nowakowski, Francis; Lookstein, Robert; Fischman, Aaron M
2018-03-01
To examine the safety and outcomes for patients undergoing transradial noncoronary interventions with international normalized ratio (INR) ≥1.5. A retrospective review of 2,271 transradial access (TRA) cases performed from July 2012 to July 2016 was conducted. Criteria for inclusion were moderate bleeding risk cases with preprocedure INR ≥1.5. Within the study period, there were 176 moderate bleeding risk procedures (transarterial chemoembolization: 70/176 [39.8%]; Barbeau B: 121/176 [68.8%]; 5-F sheath: 157/176 [89.2%]) performed on 122 patients (age 61.6 ± 12.1 years, 68.9% male, body mass index 28.0 kg/m 2 ) with INR ≥1.5. Technical success was achieved in 98.9% of cases. Grade 1/2 hematomas developed in 10 cases (5.7%). Age ≥65 years (P = .042) and female sex (P = .046) were predictive of access site bleeding complications. Fresh frozen plasma (FFP) transfusion was administered in 11.4% of cases (n = 20). Baseline INR and creatinine were significantly different between transfused and nontransfused cases (P values .006 and .028, respectively). Minor access site bleeding occurred in 3/20 cases (15%) receiving prior FFP transfusion and 7/156 nontransfused cases (4.5%), with no significant difference between these 2 groups (P = .072). TRA in patients with elevated INR appears to be safe in our experience. Age ≥65 years and female sex were associated with increased incidence of access site bleeding. Although INR correction was not standardized in this cohort, preprocedure FFP transfusion did not decrease bleeding complications. Copyright © 2017 SIR. Published by Elsevier Inc. All rights reserved.
ERIC Educational Resources Information Center
Von Seggern, Marilyn; Jourdain, Janet M.
1996-01-01
A survey of the different technical communications and information-related activities of 305 engineers and scientists from 3 sites of the Philips Laboratory, an Air Force research and development laboratory, found that scientists have a closer affinity for libraries and traditional information sources than do engineers. Eight tables depict survey…
Jerome I. Friedman, Henry W. Kendall, Richard E. Taylor and the Development
on the Web. Documents: Experimental Search for a Heavy Electron, DOE Technical Report, September 1967 1967 (Taylor, R. E.) Deep Inelastic Electron Scattering: Experimental, DOE Technical Report, October page may take you to non-federal websites. Their policies may differ from this site. Website Policies
Delivery of Instruction via Television. Final Report.
ERIC Educational Resources Information Center
Wisconsin State Board of Vocational, Technical, and Adult Education, Madison.
During 1985, the Wisconsin Board of Vocational, Technical, and Adult Education (VTAE) expanded its delivery of instruction via television. Approximately 3,000 persons at 170 sites throughout the United States and Canada participated in the VTAE's Technical School of the Air. In addition to delivering six to eight courses per semester, the network…
Pinellas Plant Environmental Baseline Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Pinellas Plant has been part of the Department of Energy`s (DOE) nuclear weapons complex since the plant opened in 1957. In March 1995, the DOE sold the Pinellas Plant to the Pinellas County Industry Council (PCIC). DOE has leased back a large portion of the plant site to facilitate transition to alternate use and safe shutdown. The current mission is to achieve a safe transition of the facility from defense production and prepare the site for alternative uses as a community resource for economic development. Toward that effort, the Pinellas Plant Environmental Baseline Report (EBR) discusses the current andmore » past environmental conditions of the plant site. Information for the EBR is obtained from plant records. Historical process and chemical usage information for each area is reviewed during area characterizations.« less
TECHNICAL APPROACHES TO CHARACTERIZING AND CLEANING UP BROWNFIELDS SITES: RAILROAD YARDS
This guidance document gives assistance to communities, decision-makers, states and municipalities, academia, and the private sector to address issues related to the redevelopment of Brownfields sites, specifically railroad yards. The document helps users to understand the proble...
SITE PROGRAM EVALUATION OF THE SONOTECH PULSE COMBUSTION BURNER TECHNOLOGY - TECHNICAL RESULTS
A series of demonstration tests was performed at the Environmental Protection Agency's (EPA's) Incineration Research Facility (IRF) under the Superfund Innovative Technology Evaluation (SITE) program. These tests, twelve in all, evaluated a pulse combustion burner technology dev...
Technology Diffusion. [SITE 2001 Section].
ERIC Educational Resources Information Center
Strudler, Neal, Ed.; Niederhauser, Dale S., Ed.
This document contains the following papers on technology diffusion from the SITE (Society for Information Technology & Teacher Education) 2001 conference: (1) "A Response to Technology Integration in Teacher Education for Merit, Tenure, and Promotion" (Cindy L. Anderson and David Starrett); (2) "Online Technical Support…
Technical Guide For Addressing Petroleum Vapor Intrusion At Leaking Underground Storage Tank Sites
This document is intended for use at any site subject to petroleum contamination from underground storage tanks where vapor intrusion may be of potential concern. It is applicable to both residential and non-residential settings.
15. SITE BUILDING 004 ELECTRIC POWER STATION VIEW ...
15. SITE BUILDING 004 - ELECTRIC POWER STATION - VIEW IS LOOKING SOUTH 55° EAST AT FIVE DIESEL ENGINE/ GENERATOR SILENCER SYSTEM EXHAUST STACKS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
District-Scale Green Infrastructure Scenarios for the Zidell Development Site, City of Portland
The report outlines technical assistance to develop green infrastructure scenarios for the Zidell Yards site consistent with the constraints of a recently remediated brownfield that can be implemented within a 15-20 year time horizon.
A Technical Guide to Ground-Water Model Selection at Sites Contaminated with Radioactive Substances
This report addresses the selection of ground-water flow and contaminant transport models and is intended to be used by hydrogeologists and geoscientists responsible for selecting transport models for use at sites containing radioactive materials.
77 FR 64494 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
...: Department of Energy Information Center, Office of Science and Technical Information, 1 Science.gov Way, Oak...-3315; Fax (865) 576-0956 or email: [email protected]gov or check the Web site at www.oakridge.doe.gov/em... following Web site: http://www.oakridge.doe.gov/em/ssab/minutes.htm . [[Page 64495
78 FR 23241 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-18
... of Energy Information Center, Office of Science and Technical Information, 1 Science.gov Way, Oak...-3315; Fax (865) 576-0956 or email: [email protected]gov or check the Web site at www.oakridge.doe.gov/em... also be available at the following Web site: http://www.oakridge.doe.gov/em/ssab/minutes.htm . Issued...
77 FR 49442 - Environmental Management Site-Specific Advisory Board, Oak Ridge Reservation
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-16
...: Department of Energy Information Center, Office of Science and Technical Information, 1 Science.gov Way, Oak...-3315; Fax (865) 576-0956 or email: [email protected]gov or check the Web site at www.oakridge.doe.gov/em... following Web site: http://www.oakridge.doe.gov/em/ssab/minutes.htm . [[Page 49443
The U.S Environmental Protection Agency (EPA) provides technical assistance to the NADP/NTN network through a site visitation program. esearch Triangle Institute, as contractor to EPA, conducts these visits. f deficiencies or nonstandard procedures are noted, the site operator an...
The Patroon Creek Contamination Migration Investigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dufek, K.; Zafran, A.; Moore, J.T.
2006-07-01
Shaw performed a Site Investigation (SI) for sediment within the Unnamed Tributary of the Patroon Creek, a section of the Patroon Creek, and the Three Mile Reservoir as part of the overall contract with the United States Army Corps of Engineers (USACE) to remediate the Colonie Formerly Utilized Sites Remedial Action Program (FUSRAP) Site. The Unnamed Tributary formerly flowed through the former Patroon Lake, which was located on the main site property and was used as a landfill for radiological and chemical wastes. The objective of the investigation was to determine the absence/presence of radioactive contamination within the three Areasmore » of Concern (AOC). In order to accomplish this objective, Shaw assembled a team to produce a Technical Memorandum that provided an in-depth understanding of the environmental conditions related to the Patroon Creek. Upon completion and analysis of the Technical Memorandum, a Conceptual Site Model (CSM) was constructed and a Technical Planning Program (TPP) was held to develop a Sediment Investigation Work Plan and Sediment Investigation Sampling and Analysis Plan. A total of 32 sample locations were analyzed using on-site direct gamma scans with a Pancake Geiger-Mueller (PGM) instrument for screening purposes and samples were analyzed at on-site and off-site laboratories. The highest interval from each core scan was selected for on-site analysis utilizing a High Purity Germanium (HPGe) detector. Eight of these samples were sent off-site for gamma/alpha spectroscopy confirmation. The data collected during the SI indicated that the U-238 cleanup criterion was exceeded in sediment samples collected from two locations within the Unnamed Tributary but not in downstream sections of Patroon Creek or Three Mile Reservoir. Future actions for impacted sediment in the Unnamed Tributary will be further evaluated. Concentrations of U-238 and Th-232 in all other off-site sediment samples collected from the Unnamed Tributary, Patroon Creek, and the Three Mile Reservoir indicate that no further action is required in these areas. The data was also compared to ecological screening criteria. None of the contaminants of concern (U-238, Th-232, and U-235) had concentrations exceeding the screening values. The evaluation indicates no adverse impacts to ecological receptors. (authors)« less
Atom Interferometry for Detection of Gravitational Waves: Progress and Prospects
NASA Astrophysics Data System (ADS)
Hogan, Jason
2015-04-01
Gravitational wave astronomy promises to provide a new window into the universe, collecting information about astrophysical systems and cosmology that is difficult or impossible to acquire by other methods. Detector designs based on atom interferometry offer a number of advantages over traditional approaches, including access to conventionally inaccessible frequency ranges and substantially reduced antenna baselines. Atomic physics techniques also make it possible to build a gravitational wave detector with a single linear baseline, potentially offering advantages in cost and design flexibility. In support of these proposals, recent progress in long baseline atom interferometry has enabled observation of matter wave interference with atomic wavepacket separations exceeding 10 cm and interferometer durations of more than 2 seconds. These results are obtained in a 10-meter drop tower incorporating large momentum transfer atom optics. This approach can provide ground-based proof-of-concept demonstrations of many of the technical requirements of both terrestrial and satellite gravitational wave detectors.
Quality and accuracy of sexual health information web sites visited by young people.
Buhi, Eric R; Daley, Ellen M; Oberne, Alison; Smith, Sarah A; Schneider, Tali; Fuhrmann, Hollie J
2010-08-01
We assessed online sexual health information quality and accuracy and the utility of web site quality indicators. In reviewing 177 sexual health web sites, we found below average quality but few inaccuracies. Web sites with the most technically complex information and/or controversial topics contained the most inaccuracies. We found no association between inaccurate information and web site quality. (c) 2010 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.
1980-12-22
1973). Several studies of petroglyph sites have also been completed ( Heizer and Baumhoff, 1962; T. Thomas, 1976). Most recent work has been in the...primarily open sites, projectile points (eg., Heizer and Hester, 1978; Holmer, 1978; Thomas, 1970) and pottery (eg., Baldwin, 1950; Madsen, 1977) will be...sites documented in site files. The previous tendency to not record historic properties for inclusion in state and agency site files has rendered these
75 FR 35781 - Centana Intrastate Pipeline, LLC; Notice of Baseline Filing
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-23
... the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail [email protected] Intrastate Pipeline, LLC submitted a baseline filing of its Transport Statement of Operating Conditions for...
Diversity reception of COMSTAR SHF beacons with the Tampa triad, 1978 - 1981
NASA Technical Reports Server (NTRS)
Davidson, D.; Tang, D. D.
1982-01-01
The results of 19 GHz downlink rain attenuation diversity measurements in Tampa over a 29 month period (1978-1980), and the results of a 20 GHz diversity study during the summer of 1981, using the remaining COMSTAR beacon are presented. At 19 GHz, site separations of 11, 16, and 20 km were used, with reception at high elevation angle (about 57 deg). At 29 GHz, only the 16 km baseline was employed, with elevation angle about 32 deg. Almost identical long term performance of the two longer baselines indicates that for separations above about 15 km diversity improvement was not sensitive to baseline length or direction. Diversity improvement at 29 GHz with the 16 km baseline was similar to that predicted by scaling the 19 GHz results of the previous seasons. Also discussed are the type of attenuation distributions and typical fade durations to be found under persistent convective conditions. For rain climates like Tampa's, site diversity in some form will be required for high reliability SHF satellite links. The diversity data may be helpful in designing schemes for resource sharing among numbers of links.
Gadagi, Jayaprakash S; Chava, Vijay K; Reddy, Venkata Ramesh
2013-03-01
The green tea extract is a naturally occurring product having beneficial effects that counteract with the pathobiological features of periodontitis and diabetes mellitus. Hence, the present study was aimed at incorporation of green tea extract into hydroxylpropyl methylcellulose and investigates its efficacy in chronic periodontitis patients associated with and without diabetes mellitus. For the in vitro study, formulation of green tea strips and placebo strips, and analysis of drug release pattern from the green tea strips at different time intervals were performed. For the in vivo study, 50 patients (20-65 years), including 25 systemically healthy patients with chronic periodontitis (group 1) and 25 diabetic patients with chronic periodontitis (group 2) were enrolled. In each patient, test and control sites were identified for the placement of green tea and placebo strips, respectively. Gingival Index (GI), Probing Pocket Depth (PPD), and Clinical Attachment Level (CAL) were examined at baseline, first, second, third, and fourth weeks. Microbiological analysis for Porphyromonas gingivalis and Aggregatibacter actinomycetemcomitans was performed at baseline and fourth week. The in vitro study showed 10.67% green tea release at 30 min; thereafter, a slow release was noted till 120 min. Both groups showed significant reduction in GI scores at the test sites. Group 1 showed significant (P < 0.001) PPD reduction at different time intervals at the test sites. However, group 2 showed significant reduction from baseline (5.30 ± 0.70) to fourth week (3.5 ± 0.97). Statistically significant gain in CAL at the test sites was observed both in group 1 (1.33 mm) and group 2 (1.43 mm). The prevalence of P. gingivalis in group 1 test sites was significantly reduced from baseline (75%) to fourth week (25%). Local drug delivery using green tea extract could be used as an adjunct in the treatment of chronic periodontitis in diabetic and non-diabetic individuals.