Sample records for site testing final

  1. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowe, M.D.; Pierce, B.L.

    This report presents results of tests of different final site selection methods used for siting large-scale facilities such as nuclear power plants. Test data are adapted from a nuclear power plant siting study conducted on Long Island, New York. The purpose of the tests is to determine whether or not different final site selection methods produce different results, and to obtain some understanding of the nature of any differences found. Decision rules and weighting methods are included. Decision rules tested are Weighting Summation, Power Law, Decision Analysis, Goal Programming, and Goal Attainment; weighting methods tested are Categorization, Ranking, Rating Ratiomore » Estimation, Metfessel Allocation, Indifferent Tradeoff, Decision Analysis lottery, and Global Evaluation. Results show that different methods can, indeed, produce different results, but that the probability that they will do so is controlled by the structure of differences among the sites being evaluated. Differences in weights and suitability scores attributable to methods have reduced significance if the alternatives include one or two sites that are superior to all others in many attributes. The more tradeoffs there are among good and bad levels of different attributes at different sites, the more important are the specifics of methods to the final decision. 5 refs., 14 figs., 19 tabs.« less

  3. FSA field test

    NASA Technical Reports Server (NTRS)

    Jaffe, P.; Weaver, R. W.; Lee, R. E.

    1981-01-01

    The 12 continental remote sites were decommissioned. Testing was consolidated into a five-site network consisting of the four Southern California sites and a new Florida site. 16 kW of new state-of-the-art modules were deployed at the five sites. Testing of the old modules continued at the Goldstone site but as a low-priority item. Array testing of modules is considered. Additional new testing capabilities were added. A battery-powered array data logger is discussed. A final set of failure and degradation data was obtained from the modules.

  4. Tailgate test kit for determining appropriate sediment reducing chemicals and dose rates : final report.

    DOT National Transportation Integrated Search

    2017-07-01

    This study develops a Tailgate Test Kit to be used in the field to test flocculants for reducing turbidity in construction stormwater discharge. Turbidity of stormwater runoff at construction sites varies depending on which site soils are exposed to ...

  5. Contractor for geopressured-geothermal sites: Final contract report, Volume 1, fiscal years 1986--1990 (5 years), testing of wells through October 1990. Appendix A, Volume 2, Gladys McCall Site (Cameron Parish LA); Appendix B-1, Volume 3, Pleasant Bayou Site; Appendix B-2, Volume 4, Pleasant Bayou Site; Appendix C, Volume 5, Willis Hulin Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    Field tests and studies were conducted to determine the production behavior of geopressured-geothermal reservoirs and their potential as future energy sources. Results are presented for Gladys McCall Site, Pleasant Bayou Site, and Hulin Site.

  6. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 5, Addenda D6--D8 to Appendix D: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1990-02-01

    This volume contains appendices D6 through D8 containing laboratory test data: from MK-F investigation, 1987, Old Rifle and New Rifle sites; on bentonite amended radon barrier material; and from MK-F investigation, 1987, riprap tests.

  7. Site selection for MSFC operational tests of solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The criteria, methodology, and sequence aspects of the site selection process are presented. This report organized the logical thought process that should be applied to the site selection process, but final decisions are highly selective.

  8. Professional Development for Occupational Specialist: Occupational Competency Testing. Final Report.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN.

    The organization, scope, and activities of the Indiana Occupational Competency Testing Center were expanded to accommodate the requirements of the new Occupational Specialist Certificate for secondary vocational teacher credentialling. A pilot project involved three regional sites in the state. The director of the host area site acted as area…

  9. Geothermal well site restoration and plug and abandonment of wells, DOE Gladys McCall test site, Cameron Parish, Louisiana and DOE Willis Hulin test site, Vermillion Parish, Louisiana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rinehart, Ben N.

    1994-08-01

    A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana--the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete,more » utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports, and cost and salvage reports. Site locations, grid maps, and photographs are provided.« less

  10. Final Work Plan for CO2 Sparging Proof of Concept Test, LCP Chemical Site

    EPA Pesticide Factsheets

    September 11, 2012 plan to address concerns on a pilot test of carbon dioxide sparging to neutralize pH and reduce the density of the Caustic Brine Pool (CBP) at the LCP Chemicals Superfund Site, GA. Region ID: 04 DocID: 10903388, DocDate: 09-11-2012

  11. SUPERFUND TREATABILITY CLEARINGHOUSE: FINAL REPORT, PHASE I - IMMEDIATE ASSESSMENT, ACME SOLVENTS SITE

    EPA Science Inventory

    This is a site assessment and feasibility study of incineration alternatives at the ACME Solvents Site at Rockford, Illinois. The document contains laboratory results that are reported to simulate incineration conditions but no details on test methods were provided. The d...

  12. Improving design phase evaluations for high pile rebound sites : final report.

    DOT National Transportation Integrated Search

    2016-05-31

    A testing program performed to help determine typical soils properties encountered during pile installation when high rebound : occurs produced a decision matrix for geotechnical engineers. High pile rebound (HPR) occurred at numerous sites in Florid...

  13. Piezo-electric automatic vehicle classification system : Oregon Department of Transportation with Castle Rock Consultants for a SHRP Long Term Pavement Performance Site : final report.

    DOT National Transportation Integrated Search

    1991-07-01

    Oregon has twelve pavement test sites that are part of the Strategic Highway Research Program (SHRP), Long Term Pavement Performance (LTPP) studies. Part of the data gathering on these sites involves vehicle weight and classification. This pilot proj...

  14. The Thirty Meter Telescope Site Testing Robotic Computer System

    NASA Astrophysics Data System (ADS)

    Riddle, Reed L.; Schöck, M.; Skidmore, W.; Els, S.; Travouillon, T.

    2008-03-01

    The Thirty Meter Telescope (TMT) project is currently testing five remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote, they require a control system that can automatically manage the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This is a discussion of the TMT site testing robotic computer system as implemented.

  15. Contractor point of view for system development and test program

    NASA Technical Reports Server (NTRS)

    Koide, F. K.; Ringer, D. E.; Earl, C. E.

    1981-01-01

    Industry's practice of testing space qualified hardware is examined. An overview of the Global Positioning System (GPS) Test Program is discussed from the component level to the sub-system compatibility tests with the space vehicle and finally to the launch site tests, all related to the Rubidium clock.

  16. Site characterization methodology for aquifers in support of bioreclamation activities. Volume 2: Borehole flowmeter technique, tracer tests, geostatistics and geology. Final report, August 1987-September 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, S.C.

    1993-08-01

    This report discusses a field demonstration of a methodology for characterizing an aquifer's geohydrology in the detail required to design an optimum network of wells and/or infiltration galleries for bioreclamation systems. The project work was conducted on a 1-hectare test site at Columbus AFB, Mississippi. The technical report is divided into two volumes. Volume I describes the test site and the well network, the assumptions, and the application of equations that define groundwater flow to a well, the results of three large-scale aquifer tests, and the results of 160 single-pump tests. Volume II describes the bore hole flowmeter tests, themore » tracer tests, the geological investigations, the geostatistical analysis and the guidelines for using groundwater models to design bioreclamation systems. Site characterization, Hydraulic conductivity, Groundwater flow, Geostatistics, Geohydrology, Monitoring wells.« less

  17. 10 CFR 707.12 - Specimen collection, handling and laboratory analysis for drug testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... drug testing. 707.12 Section 707.12 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.12 Specimen collection, handling and laboratory analysis for drug testing... collection to final disposition of specimens, and testing laboratories shall use appropriate cutoff levels in...

  18. 10 CFR 707.12 - Specimen collection, handling and laboratory analysis for drug testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... drug testing. 707.12 Section 707.12 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.12 Specimen collection, handling and laboratory analysis for drug testing... collection to final disposition of specimens, and testing laboratories shall use appropriate cutoff levels in...

  19. 10 CFR 707.12 - Specimen collection, handling and laboratory analysis for drug testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... drug testing. 707.12 Section 707.12 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.12 Specimen collection, handling and laboratory analysis for drug testing... collection to final disposition of specimens, and testing laboratories shall use appropriate cutoff levels in...

  20. 10 CFR 707.12 - Specimen collection, handling and laboratory analysis for drug testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... drug testing. 707.12 Section 707.12 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.12 Specimen collection, handling and laboratory analysis for drug testing... collection to final disposition of specimens, and testing laboratories shall use appropriate cutoff levels in...

  1. 10 CFR 707.12 - Specimen collection, handling and laboratory analysis for drug testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... drug testing. 707.12 Section 707.12 Energy DEPARTMENT OF ENERGY WORKPLACE SUBSTANCE ABUSE PROGRAMS AT DOE SITES Procedures § 707.12 Specimen collection, handling and laboratory analysis for drug testing... collection to final disposition of specimens, and testing laboratories shall use appropriate cutoff levels in...

  2. Siting a municipal solid waste disposal facility, part II: the effects of external criteria on the final decision.

    PubMed

    Korucu, M Kemal; Karademir, Aykan

    2014-02-01

    The procedure of a multi-criteria decision analysis supported by the geographic information systems was applied to the site selection process of a planning municipal solid waste management practice based on twelve different scenarios. The scenarios included two different decision tree modes and two different weighting models for three different area requirements. The suitability rankings of the suitable sites obtained from the application of the decision procedure for the scenarios were assessed by a factorial experimental design concerning the effect of some external criteria on the final decision of the site selection process. The external criteria used in the factorial experimental design were defined as "Risk perception and approval of stakeholders" and "Visibility". The effects of the presence of these criteria in the decision trees were evaluated in detail. For a quantitative expression of the differentiations observed in the suitability rankings, the ranking data were subjected to ANOVA test after a normalization process. Then the results of these tests were evaluated by Tukey test to measure the effects of external criteria on the final decision. The results of Tukey tests indicated that the involvement of the external criteria into the decision trees produced statistically meaningful differentiations in the suitability rankings. Since the external criteria could cause considerable external costs during the operation of the disposal facilities, the presence of these criteria in the decision tree in addition to the other criteria related to environmental and legislative requisites could prevent subsequent external costs in the first place.

  3. SUPERFUND TREATABILITY CLEARINGHOUSE: BDAT FOR SOLIDIFICATION/STABILIZATION TECHNOLOGY FOR SUPERFUND SOILS (DRAFT FINAL REPORT)

    EPA Science Inventory

    This report evaluates the performance of solidification as a method for treating solids from Superfund sites. Tests were conducted on four different artificially contaminated soils which are representative of soils found at the sites. Contaminated soils were solidified us...

  4. The Thirty Meter Telescope site testing robotic computer system

    NASA Astrophysics Data System (ADS)

    Riddle, Reed L.; Schöck, Matthias; Skidmore, Warren

    2006-06-01

    The Thirty Meter Telescope (TMT) project is currently testing six remote sites as candidates for the final location of the telescope. Each site has several instruments, including seeing monitors, weather stations, and turbulence profile measuring systems, each of which is computer controlled. As the sites are remote (usually hours from the nearest town), they requires a system that can control the operations of all the varied subsystems, keep the systems safe from damage and recover from errors during operation. The robotic system must also be robust enough to operate without human intervention and when internet connections are lost. It is also critical that a data archiving system diligently records all data as gathered. This paper is a discussion of the TMT site testing robotic computer system as implemented.

  5. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  6. 75 FR 27784 - Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort AGENCY: National Institute for Occupational Safety and Health... concerning the final effect of the decision to designate a class of employees from the Nevada Test Site as an...

  7. 77 FR 73286 - Codification of Animal Testing Policy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... to post the test method on the animal testing Web site. In the final statement of policy, we refer to... case-by-case basis and, upon review, determine whether to post the test method on the animal testing... on a case-by- case basis and, upon review, determine whether to post the test method on the animal...

  8. SITE project. Phase 1: Continuous data bit-error-rate testing

    NASA Technical Reports Server (NTRS)

    Fujikawa, Gene; Kerczewski, Robert J.

    1992-01-01

    The Systems Integration, Test, and Evaluation (SITE) Project at NASA LeRC encompasses a number of research and technology areas of satellite communications systems. Phase 1 of this project established a complete satellite link simulator system. The evaluation of proof-of-concept microwave devices, radiofrequency (RF) and bit-error-rate (BER) testing of hardware, testing of remote airlinks, and other tests were performed as part of this first testing phase. This final report covers the test results produced in phase 1 of the SITE Project. The data presented include 20-GHz high-power-amplifier testing, 30-GHz low-noise-receiver testing, amplitude equalization, transponder baseline testing, switch matrix tests, and continuous-wave and modulated interference tests. The report also presents the methods used to measure the RF and BER performance of the complete system. Correlations of the RF and BER data are summarized to note the effects of the RF responses on the BER.

  9. Final summary of the laboratory culture and toxicity testing of juvenile western pearlshell (Margaritifera falcata) native to the western United States: Expansion of freshwater mussel water and sediment toxicity testing methods

    EPA Science Inventory

    A Regional Applied Research Effort project with EPA Region 10, ORD and USGS was initiated as a result of a baseline ecological risk assessment (BERA) problem formulation for the Upper Columbia River (UCR) site in northwest Washington. The UCR site is a 165-mile stretch of the Col...

  10. Influence of physical, chemical and biological conditions on the infiltration rate of highway stormwater runoff : final report.

    DOT National Transportation Integrated Search

    2017-02-01

    Double-ring infiltrometer tests were used to measure infiltration rates in situ at three sites in the Piedmont physiographic province and one site in the Coastal Plain physiographic province of Georgia. The accuracy of predicting saturated hydraulic ...

  11. SMART operational field test evaluation : dispatchers survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automaticscheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans toimplement ITS as a site for an operational field test. The purpo...

  12. SMART operational field test evaluation : scheduler survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...

  13. Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blakeslee, Samuel Norman; Toman, William I.; Williams, Richard B.

    The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro sitingmore » considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.« less

  14. VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF INTEGRITY TESTING EQUIPMENT UTILIZING CRYOGENIC BATHS IN BUILDING 991. (6/7/68) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO

  15. A continuous intrusion miniature cone penetration test system for transportation applications : final report.

    DOT National Transportation Integrated Search

    1999-01-01

    The electronic cone penetrometer is a popular in situ investigation tool for site characterization. This research report describes the application of this proven concept of the cone penetration test (CPT) to highway design and construction control by...

  16. Field Performance Of A Compacted Clay Landfill Final Cover At A Humid Site

    EPA Science Inventory

    A study was conducted in southern Georgia, USA, to evalaute how the hydraulic properties of the compacted clay barrier layer in a final landfill cover changed over a 4-year service life. The cover was part of a test section constructed in a large drainage lysimeter that allowed ...

  17. Final Environmental Assessment for the Integration and Developmental Testing of High Power Microwave Systems at Edwards Air Force Base

    DTIC Science & Technology

    2006-10-16

    spawning sites, feeding sites, 20 seasonal wetlands or drylands, water quality or quantity, host species or plant pollinators , geological 21...rufus]). 12 These areas also contain relatively large areas of sensitive plants . 13 3.9.2.9 Significant Ecological Areas found within the R-2515 and...for complete aircraft, avionics systems, and integrated 21 airframe weapons support. Thus, HPM testing would continue the evolution of the primary

  18. VIEW OF ULTRASONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF ULTRA-SONIC TESTING EQUIPMENT IN BUILDING 991. THIS EQUIPMENT NON-DESTRUCTIVELY TESTS WEAPONS COMPONENTS FOR FLAWS AND CRACKS. (9/11/85) - Rocky Flats Plant, Final Assembly & Shipping, Eastern portion of plant site, south of Spruce Avenue, east of Tenth Street & north of Central Avenue, Golden, Jefferson County, CO

  19. Development of a test facility to evaluate the optimal design of BMPs for managing environmental problems at construction sites.

    DOT National Transportation Integrated Search

    2012-06-01

    The following document is the final report for ALDOT Project 930655 which summarizes the design and : construction of the Auburn University Erosion and Sediment Control Testing Facility (AUESCTF) along : with several intermediatescale, f...

  20. Factors associated with degree of atopy in Latino children in a nationwide pediatric sample: The GALA II Study

    PubMed Central

    Kumar, Rajesh; Nguyen, Elizabeth A; Roth, Lindsey A; Oh, Sam S; Gignoux, Christopher R.; Huntsman, Scott; Eng, Celeste; Moreno-Estrada, Andres; Sandoval, Karla; Peñaloza-Espinosa, Rosenda; López-López, Marisol; Avila, Pedro C.; Farber, Harold J.; Tcheurekdjian, Haig; Rodriguez-Cintron, William; Rodriguez-Santana, Jose R; Serebrisky, Denise; Thyne, Shannon M.; Williams, L. Keoki; Winkler, Cheryl; Bustamante, Carlos D.; Pérez-Stable, Eliseo J.; Borrell, Luisa N.; Burchard, Esteban G

    2013-01-01

    Background Atopy varies by ethnicity even within Latino groups. This variation may be due to environmental, socio-cultural or genetic factors. Objective To examine risk factors for atopy within a nationwide study of U.S. Latino children with and without asthma. Methods Aeroallergen skin test repsonse was analyzed in 1830 US latino subjects. Key determinants of atopy included: country / region of origin, generation in the U.S., acculturation, genetic ancestry and site to which individuals migrated. Serial multivariate zero inflated negative binomial regressions, stratified by asthma status, examined the association of each key determinant variable with the number of positive skin tests. In addition, the independent effect of each key variable was determined by including all key variables in the final models. Results In baseline analyses, African ancestry was associated with 3 times as many positive skin tests in participants with asthma (95% CI:1.62–5.57) and 3.26 times as many positive skin tests in control participants (95% CI: 1.02–10.39). Generation and recruitment site were also associated with atopy in crude models. In final models adjusted for key variables, Puerto Rican [exp(β) (95%CI): 1.31(1.02–1.69)] and mixed ethnicity [exp(β) (95%CI):1.27(1.03–1.56)] asthmatics had a greater probability of positive skin tests compared to Mexican asthmatics. Ancestry associations were abrogated by recruitment site, but not region of origin. Conclusions Puerto Rican ethnicity and mixed origin were associated with degree of atopy within U.S. Latino children with asthma. African ancestry was not associated with degree of atopy after adjusting for recruitment site. Local environment variation, represented by site, was associated with degree of sensitization. PMID:23684070

  1. MAC Europe 1991 campaign: AIRSAR/AVIRIS data integration for agricultural test site classification

    NASA Technical Reports Server (NTRS)

    Sangiovanni, S.; Buongiorno, M. F.; Ferrarini, M.; Fiumara, A.

    1993-01-01

    During summer 1991, multi-sensor data were acquired over the Italian test site 'Otrepo Pavese', an agricultural flat area in Northern Italy. This area has been the Telespazio pilot test site for experimental activities related to agriculture applications. The aim of the investigation described in the following paper is to assess the amount of information contained in the AIRSAR (Airborne Synthetic Aperture Radar) and AVIRIS (Airborne Visible/Infrared Imaging Spectrometer) data, and to evaluate classification results obtained from each sensor data separately and from the combined dataset. All classifications are examined by means of the resulting confusion matrices and Khat coefficients. Improvements of the classification results obtained by using the integrated dataset are finally evaluated.

  2. 78 FR 98 - Notice of Availability: Test Tools and Test Procedures Approved by the National Coordinator for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ...This notice announces the availability of test tools and test procedures approved by the National Coordinator for Health Information Technology (the National Coordinator) for the testing of EHR technology to the 2014 Edition EHR certification criteria under the ONC HIT Certification Program. The approved test tools and test procedures are identified on the ONC Web site at: http://www.healthit.gov/policy- researchers-implementers/2014-edition-final-test-method.

  3. Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dooher, Brendan; Toman, William I.; Davy, Doug M.

    The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro sitingmore » considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.« less

  4. Final Environmental Assessment for Conventional Strike Missile Demonstration

    DTIC Science & Technology

    2010-08-11

    impacts of conducting a single demonstration flight test of the Conventional Strike Missile (CSM). The CSM Demonstration flight test vehicle would...Vehicle would glide at hypersonic velocities in the upper atmosphere, prior to a land or ocean impact at the US Army Kwajalein Atoll/Reagan Test Site...SIGNIFICANT IMPACT ENVIRONMENTAL ASSESSMENT FOR CONVENTIONAL STRIKE MISSILE DEMONSTRATION AGENCY: United States Air Force (USAF) BACKGROUND

  5. Decision Support System For Management Of Low-Level Radioactive Waste Disposal At The Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, G.; Yucel, V.; Desotell, L.

    2006-07-01

    The long-term safety of U.S. Department of Energy (DOE) low-level radioactive disposal facilities is assessed by conducting a performance assessment -- a systematic analysis that compares estimated risks to the public and the environment with performance objectives contained in DOE Manual 435.1-1, Radioactive Waste Management Manual. Before site operations, facilities design features such as final inventory, waste form characteristics, and closure cover design may be uncertain. Site operators need a modeling tool that can be used throughout the operational life of the disposal site to guide decisions regarding the acceptance of problematic waste streams, new disposal cell design, environmental monitoringmore » program design, and final site closure. In response to these needs the National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has developed a decision support system for the Area 5 Radioactive Waste Management Site in Frenchman Flat on the Nevada Test Site. The core of the system is a probabilistic inventory and performance assessment model implemented in the GoldSim{sup R} simulation platform. The modeling platform supports multiple graphic capabilities that allow clear documentation of the model data sources, conceptual model, mathematical implementation, and results. The combined models have the capability to estimate disposal site inventory, contaminant concentrations in environmental media, and radiological doses to members of the public engaged in various activities at multiple locations. The model allows rapid assessment and documentation of the consequences of waste management decisions using the most current site characterization information, radionuclide inventory, and conceptual model. The model is routinely used to provide annual updates of site performance, evaluate the consequences of disposal of new waste streams, develop waste concentration limits, optimize the design of new disposal cells, and assess the adequacy of environmental monitoring programs. (authors)« less

  6. Using site-selection model to identify suitable sites for seagrass transplantation in the west coast of South Sulawesi

    NASA Astrophysics Data System (ADS)

    Lanuru, Mahatma; Mashoreng, S.; Amri, K.

    2018-03-01

    The success of seagrass transplantation is very much depending on the site selection and suitable transplantation methods. The main objective of this study is to develop and use a site-selection model to identify the suitability of sites for seagrass (Enhalus acoroides) transplantation. Model development was based on the physical and biological characteristics of the transplantation site. The site-selection process is divided into 3 phases: Phase I identifies potential seagrass habitat using available knowledge, removes unnecessary sites before the transplantation test is performed. Phase II involves field assessment and transplantation test of the best scoring areas identified in Phase I. Phase III is the final calculation of the TSI (Transplant Suitability Index), based on results from Phases I and II. The model was used to identify the suitability of sites for seagrass transplantation in the West coast of South Sulawesi (3 sites at Labakkang Coast, 3 sites at Awerange Bay, and 3 sites at Lale-Lae Island). Of the 9 sites, two sites were predicted by the site-selection model to be the most suitable sites for seagrass transplantation: Site II at Labakkang Coast and Site III at Lale-Lae Island.

  7. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less

  8. 13-Foot Diameter Hydrogen Tank Tested in the K-Site Test Chamber

    NASA Image and Video Library

    1967-09-21

    A 13-foot diameter mounted inside the large test chamber at the Cryogenic Propellant Tank, or K-Site, at National Aeronautics and Space Administration’s (NASA) Plum Brook Station. The 25-foot test chamber and 20-foot access door were designed to test liquid hydrogen fuel tanks up to 18 feet in diameter in conditions that simulated launches and spaceflight. Shakers were installed to test the effects of launch vibration on the tanks and their insulation. The K Site chamber was also equipped with cold walls that could be cooled with either liquid nitrogen or liquid hydrogen and vacuum pumps that could reduce pressure levels to 10-8 torr. This 13-foot tank passed its initial acceptance tests in K-Site on August 24, 1966. Delays in the modification of the tank postponed further tests of the tank until May 1967. Four pressure hold tests and expulsion runs were made in May using gaseous hydrogen or gaseous helium at 300R and 520R. In June a straight pipe injector test was run and two pressure effect tests at 35 and 75psi. Propellant slosh tests were successfully run in August. This photograph was taken the day after the program’s final runs on September 12, 1967.

  9. Final Environmental Impact Statement (EIS) for the Space Nuclear Thermal Propulsion (SNTP) Program. Sanitized Version

    DTIC Science & Technology

    1991-09-19

    Company) in Torrance, CA; (8) Gnmman Space Electronics Division in Bethpage, NY; (9) Raytheon Services Nevada (RSN) in Las Vegas, NV; (10) Reynolds...10 to 20 minutes long, and spaced 1 or more weeks apart. (S) The accident scenario would result in a dose to a mximally exposed individual and to the...3.1-14 3.1.7 Grumman Corporation, Space and Electronics Division (U) 3.1-17 3.2 Ground Test Sites (U) 3.2-1 3.2.1 Nevada Test Site and Saddle Mountain

  10. Experimental Civilian Personnel Office Project (EXPO): Final Report for Nonappropriated Fund Sites

    DTIC Science & Technology

    1991-07-01

    existing data bases; budgetary data; and other documents provided by the test sites. The results indicate that EXPO initiatives had a positive impact on...EXPO has had a positive impact on NAF operations and profitability of revenue-generating activities has remained stable. Important findings include...appropriate education and training resources are available. v viii VllI CONTENTS INTRO DU CTIO N

  11. Final 2014 Remedial Action Report Project Chariot, Cape Thompson, Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2015-03-01

    This report was prepared to document remedial action (RA) work performed at the former Project Chariot site located near Cape Thompson, Alaska during 2014. The work was managed by the U.S. Army Corps of Engineers (USACE) Alaska District for the U.S. Department of Energy (DOE) Office of Legacy Management (LM). Due to the short field season and the tight barge schedule, all field work was conducted at the site July 6 through September 12, 2014. Excavation activities occurred between July 16 and August 26, 2014. A temporary field camp was constructed at the site prior to excavation activities to accommodatemore » the workers at the remote, uninhabited location. A total of 785.6 tons of petroleum, oil, and lubricants (POL)-contaminated soil was excavated from four former drill sites associated with test holes installed circa 1960. Diesel was used in the drilling process during test hole installations and resulted in impacts to surface and subsurface soils at four of the five sites (no contamination was identified at Test Hole Able). Historic information is not definitive as to the usage for Test Hole X-1; it may have actually been a dump site and not a drill site. In addition to the contaminated soil, the steel test hole casings were decommissioned and associated debris was removed as part of the remedial effort.« less

  12. LTPP pavement maintenance materials : SHRP joint reseal experiment, final report.

    DOT National Transportation Integrated Search

    1999-09-01

    The Strategic Highway Research Program (SHRP) H-106 maintenance experiment and the Federal Highway : Administration (FHWA) Long-Term Monitoring (LTM) of Pavement Maintenance Materials Test Sites project studied : the resealing of joints in concrete p...

  13. Electrical resistivity measurement of mechanically stabilized Earth wall backfill : final report.

    DOT National Transportation Integrated Search

    2016-06-01

    In Kansas, mechanically stabilized earth (MSE) retaining walls are typically backfilled with coarse aggregate. : Current backfill material testing procedures used by the Kansas Department of Transportation (KDOT) utilize on-site : observations for co...

  14. Optimization of Fit for Mass Customized Apparel Ordering Using Fit Preference and Self Measurement.

    DTIC Science & Technology

    2000-01-01

    shorts had the highest satisfaction of fit and which short provided the optimum fit. Finally a discrepancy question form and a manual order form were...used during fit test sessions. In pilot testing manual order forms were used exclusively to record self-measurements and fit preference responses for...test participants. The website requirements were completed on site in the pilot test and manual order forms were returned to test evaluators once

  15. Desert Research and Technology Studies (RATS) Local and Remote Test Sites

    NASA Technical Reports Server (NTRS)

    Janoiko, Barbara; Kosmo, Joseph; Eppler, Dean

    2007-01-01

    Desert RATS (Research and Technology Studies) is a combined group of inter-NASA center scientists and engineers, collaborating with representatives of industry and academia, for the purpose of conducting remote field exercises. These exercises provide the capability to validate experimental hardware and software, to evaluate and develop mission operational techniques, and to identify and establish technical requirements applicable for future planetary exploration. D-RATS completed its ninth year of field testing in September 2006. Dry run test activities prior to testing at designated remote field site locations are initially conducted at the Johnson Space Center (JSC) Remote Field Demonstration Test Site. This is a multi-acre external test site located at JSC and has detailed representative terrain features simulating both Lunar and Mars surface characteristics. The majority of the remote field tests have been subsequently conducted in various high desert areas adjacent to Flagstaff, Arizona. Both the local JSC and remote field test sites have terrain conditions that are representative of both the Moon and Mars, such as strewn rock and volcanic ash fields, meteorite crater ejecta blankets, rolling plains, hills, gullies, slopes, and outcrops. Flagstaff is the preferred remote test site location for many reasons. First, there are nine potential test sites with representative terrain features within a 75-mile radius. Second, Flagstaff is the location of the United States Geologic Survey (USGS)/Astrogeology Branch, which historically supported Apollo astronaut geologic training and currently supports and provides host accommodations to the D-RATS team. Finally, in considering the importance of logistics in regard to providing the necessary level of support capabilities, the Flagstaff area provides substantial logistics support and lodging accommodations to take care of team members during long hours of field operations.

  16. Study of emissions from passenger cars in six cities, FY79. Volume I. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-10-01

    The standard mass emission test (Federal Test Procedure) was performed for emission factors determination on samples of passenger cars operating in Los Angeles, Houston, Denver, Phoenix, St. Louis and Washington, DC. These samples were also used for obtaining abbreviated emission test (short cycle test), fuel economy test, emission related maintenance and other data. Two-thousand forty-two (2,042) vehicles were tested under the program. The FTP and the Highway Fuel Economy Test were performed on all vehicles at all sites. Some vehicles which exceed Federal standards (excluding the Houston site) were subjected to a restorative maintenance evaluation. The evaluation employed in Losmore » Angeles was designed to address three-way catalyst technology. Some vehicles in all but the Los Angeles site were used to evaluate commercial repair facility performance in relation to idle speed and mixture adjustments. Other actions were taken in relation to each vehicle tested. These included an emission control system maladjustment/disablement and status inspection driveability evaluations and owner interviews to obtain vehicle maintenance and usage data.« less

  17. Analysis of socket preservation using polylactide and polyglycolide (PLA-PGA) sponge: a clinical, radiographic, and histologic study.

    PubMed

    Madan, Rohit; Mohan, Ranjana; Bains, Vivek K; Gupta, Vivek; Singh, G P; Madan, Mani

    2014-01-01

    The aim of this study was to evaluate the extraction socket healing and dimensional changes following alveolar ridge preservation using polylactide and polyglycolide (PLA-PGA) sponge. Fifteen patients were selected for alveolar socket preservation immediately following tooth extraction. Monoradicular maxillary and mandibular teeth were evaluated. The selected sockets had intact sockets walls with a minimum of 7 mm of residual alveolar bone height. The test sites were thoroughly debrided and grafted with PLA-PGA sponge, while the control sites underwent natural healing. Computed tomography (CT) measurements were taken at baseline and 6 months. After 6 months of healing, final CT measurements were performed, and trephine core biopsy specimens were obtained for histologic analysis. Implants were placed immediately after biopsy harvesting. All subjects completed the study, and all sites healed without adverse events and allowed for implant placement. The mean difference in socket height, width, and density after 6 months was statistically significantly higher in the test sites compared with control sites. Clinical measurement at the midbuccal site of the alveolar socket showed a mean loss of 2.45 ± 0.67 mm in the control group, compared with a mean gain of 1.28 ± 0.58 mm in the test group. All test sites showed minimal ridge alterations, and statistically significant differences were observed between the test and control sites with respect to bone composition and horizontal and vertical bone loss, indicating that PLA-PGA sponge is suitable for alveolar ridge preservation.

  18. NREL/University of Delaware Offshore Wind R&D Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-10-393

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Musial, Walt

    2015-11-12

    Specifically, the work under this CRADA includes, but is not limited to, the development of test procedures for an offshore test site in Delaware waters; testing of installed offshore wind turbines; performance monitoring of those turbines; and a program of research and development on offshore wind turbine blades, components, coatings, foundations, installation and construction of bottom-fixed structures, environmental impacts, policies, and more generally on means to enhance the reliability, facilitate permitting, and reduce costs for offshore wind turbines. This work will be conducted both at NREL's National Wind Technology Center and participant facilities, as well as the established offshore windmore » test sites.« less

  19. Hecules Fact Sheet.EPA.May 2011.final

    EPA Pesticide Factsheets

    EPA Region 4 fact sheet from May 2011 about a 3013 order to Hercules, Inc. in Hattiesburg, MS to conduct on- and off-site monitoring, testing, and reporting the nature and extent of any environmental contamination at their facility.

  20. LTPP pavement maintenance materials : PCC partial-depth spall repair experiment, final report.

    DOT National Transportation Integrated Search

    1999-10-01

    The Strategic Highway Research Program (SHRP) H-106 maintenance experiment and the Federal Highway Administration : (FHWA) Long-Term Monitoring (LTM) of Pavement Maintenance Materials Test Sites project studied the repair of partialdepth : spalls in ...

  1. Pathogenic amoebae in power-plant cooling lakes. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyndall, R.L.; Willaert, E.; Stevens, A.R.

    1981-06-01

    Cooling waters and associated algae and sediments from four northern and four southern/western electric power plants were tested for the presence of pathogenic amoebae. Unheated control waters and algae/sediments from four northern and five southern/western sites were also tested. When comparing results from the test versus control sites, a significantly higher proportion (P less than or equal to 0.05) of the samples from the test sites were positive for thermophilic amoeba, thermophilic Naegleria and pathogenic Naegleria. The difference in number of samples positive for thermophilic Naegleria between heated and unheated waters, however, was attributable predominantly to the northern waters andmore » algae/sediments. While two of four northern test sites yielded pathogenic Naegleria, seven of the eight isolates were obtained from one site. Seasonality effects relative to the isolation of the pathogen were also noted at this site. One pathogen was isolated from a southwestern test site. Pathogens were not isolated from any control sites. Some of the pathogenic isolates were analyzed serologically and classified as pathogenic Naegleria fowleri. Salinity, pH, conductivity, and bacteriological profiles did not obviously correlate with the presence or absence of pathogenic Naegleria. While thermal addition was significantly associated with the presence of thermophilic Naegleria (P less than or equal to 0.05), the data implicate other as yet undefined parameters associated with the presence of the pathogenic thermophile. Until further delineation of these parameters is effected, generalizations cannot be made concerning the effect of thermal impact on the growth of pathogenic amoeba in a particular cooling system.« less

  2. 10 CFR 52.39 - Finality of early site permit determinations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Finality of early site permit determinations. 52.39... NUCLEAR POWER PLANTS Early Site Permits § 52.39 Finality of early site permit determinations. (a) Commission finality. (1) Notwithstanding any provision in 10 CFR 50.109, while an early site permit is in...

  3. 10 CFR 52.39 - Finality of early site permit determinations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Finality of early site permit determinations. 52.39... NUCLEAR POWER PLANTS Early Site Permits § 52.39 Finality of early site permit determinations. (a) Commission finality. (1) Notwithstanding any provision in 10 CFR 50.109, while an early site permit is in...

  4. 78 FR 79413 - Notice of Availability of Record of Decision for Hawaii-Southern California Training and Testing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... Decision (ROD) is available on the project Web site at http://www.hstteis.com , along with the Final... of the ROD are available upon request by contacting: Naval Facilities Engineering Command Pacific...

  5. [A web-based biomedical image mosaicing system].

    PubMed

    Zhang, Meng; Yan, Zhuang-zhi; Pan, Zhi-jun; Shao, Shi-jie

    2006-11-01

    This paper describes a web service for biomedical image mosaicing. A web site based on CGI (Common Gateway Interface) is implemented. The system is based on Browser/Server model and is tested in www. Finally implementation examples and experiment results are provided.

  6. Curling and warping of concrete pavement: an investigation and proof of concept study : final report.

    DOT National Transportation Integrated Search

    2016-06-01

    In Kansas, mechanically stabilized earth (MSE) retaining walls are typically backfilled with coarse aggregate. : Current backfill material testing procedures used by the Kansas Department of Transportation (KDOT) utilize on-site : observations for co...

  7. Superfund Record of Decision (EPA Region 7): Lehigh Portland Cement Company, Mason City, IA. (First remedial action), June 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-06-28

    The Lehigh Portland Cement site is composed of two areas: the 150-acre Lehigh Portland Cement Company (LPCC) cement production facility, and the 410-acre Lime Creek Nature Center (LCNC), in Mason, Gordo County, Iowa. The site overlies an aquifer that serves as a source of water for 12 nearby wells; and municipal water is obtained from a deeper aquifer. Calmus Creek borders the site and discharges to the Winnebago River, located within a mile of the site. From 1911 to the present, the LPCC has manufactured cement products. In 1981, hydrochemical tests of Blue Waters Pond on the LPCC area indicatedmore » high alkalinity. The Record of Decision (ROD) addresses the Cement Kiln Dust ground water, and surface water as a final remedy. Elevated pH of ground water and surface water also is of potential concern. The selected remedial action for all are included.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dobler, Jeremy; Zaccheo, T. Scott; Blume, Nathan

    This report describes the development and testing of a novel system, the Greenhouse gas Laser Imaging Tomography Experiment (GreenLITE), for Monitoring, Reporting and Verification (MRV) of CO 2 at Geological Carbon Storage (GCS) sites. The system consists of a pair of laser based transceivers, a number of retroreflectors, and a set of cloud based data processing, storage and dissemination tools, which enable 2-D mapping of the CO 2 in near real time. A system was built, tested locally in New Haven, Indiana, and then deployed to the Zero Emissions Research and Technology (ZERT) facility in Bozeman, MT. Testing at ZERTmore » demonstrated the ability of the GreenLITE system to identify and map small underground leaks, in the presence of other biological sources and with widely varying background concentrations. The system was then ruggedized and tested at the Harris test site in New Haven, IN, during winter time while exposed to temperatures as low as -15 °CºC. Additional testing was conducted using simulated concentration enhancements to validate the 2-D retrieval accuracy. This test resulted in a high confidence in the reconstruction ability to identify sources to tens of meters resolution in this configuration. Finally, the system was deployed for a period of approximately 6 months to an active industrial site, Illinois Basin – Decatur Project (IBDP), where >1M metric tons of CO 2 had been injected into an underground sandstone basin. The main objective of this final deployment was to demonstrate autonomous operation over a wide range of environmental conditions with very little human interaction, and to demonstrate the feasibility of the system for long term deployment in a GCS environment.« less

  9. Phase II Testing at a Prehistoric Site (32BA418) at Lake Ashtabula (Sheyenne River) Barnes County, North Dakota.

    DTIC Science & Technology

    1984-01-01

    Subtitle) PHASE II TESTING AT 32BA3, S. TYPE OF REPORT & PERIOD COVERED BARNES COUNTY, NORTH DAKOTA. Final 6. PERFORMING ORG. REPORT NUMBER 7 . AUTHOR(a...3 4. Countour map of 32BA418 showing locations of auger test units, 1 m2 test units, cutbank profile (A - A’) and grid system ......... 7 5...Physiographic subdivisions, North Dakota ....... ............. 9 6. Vegetation zones, North Dakota ...... ................... .11 7 . Great Plains

  10. Draft Supplement to Final Environmental Statement on Continental United States (CONUS) Over-the-Horizon Backscatter (OTH-B) Radar System, Penobscot, Washington, Somerset Counties, Maine.

    DTIC Science & Technology

    1981-08-01

    by psychological tests and EEG recordings. No statistically significant differences between the two groups were found. In our opinion, the lack of...phenomena. A jet engine test facility is located immediately south of the site. Engines are tested at the facility approximately 20 times a year. The...duration of each test is approximately 68 minutes. Noise monitoring data for operation of this facility are not available; however, it is clear that

  11. Experience in Grid Site Testing for ATLAS, CMS and LHCb with HammerCloud

    NASA Astrophysics Data System (ADS)

    Elmsheuser, Johannes; Medrano Llamas, Ramón; Legger, Federica; Sciabà, Andrea; Sciacca, Gianfranco; Úbeda García, Mario; van der Ster, Daniel

    2012-12-01

    Frequent validation and stress testing of the network, storage and CPU resources of a grid site is essential to achieve high performance and reliability. HammerCloud was previously introduced with the goals of enabling VO- and site-administrators to run such tests in an automated or on-demand manner. The ATLAS, CMS and LHCb experiments have all developed VO plugins for the service and have successfully integrated it into their grid operations infrastructures. This work will present the experience in running HammerCloud at full scale for more than 3 years and present solutions to the scalability issues faced by the service. First, we will show the particular challenges faced when integrating with CMS and LHCb offline computing, including customized dashboards to show site validation reports for the VOs and a new API to tightly integrate with the LHCbDIRAC Resource Status System. Next, a study of the automatic site exclusion component used by ATLAS will be presented along with results for tuning the exclusion policies. A study of the historical test results for ATLAS, CMS and LHCb will be presented, including comparisons between the experiments’ grid availabilities and a search for site-based or temporal failure correlations. Finally, we will look to future plans that will allow users to gain new insights into the test results; these include developments to allow increased testing concurrency, increased scale in the number of metrics recorded per test job (up to hundreds), and increased scale in the historical job information (up to many millions of jobs per VO).

  12. Testing technology. A Sandia Technology Bulletin

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goetsch, B.; Floyd, H.L.; Doran, L.

    1994-02-01

    This Sandia publication seeks to facilitate technology exchange with industries, universities, and government agencies. It presents brief highlights of four projects. First is a project to simulate the use of airbags to soften the landing of a probe on Mars. Second is the use of a computer simulation system to facilitate the testing of designs for different experiments, both for experimental layout and results analysis. Third is the development of a system for in-house testing of batteries and capacitive energy storage systems, for deployment at the manufacturing sites, as opposed to final use areas. Finally is information on a noncontactmore » measurement system which can be used to determine axes on objects of different shapes, with high precision.« less

  13. Leishmania Skin Test

    DTIC Science & Technology

    2010-03-01

    LtSTA. Unlike local AE where the reaction site can be identified with a specific article , it was not possible to identify the article responsible...taken prior to the last centrifugation step to determine yield (cell concentration), bioburden and morphology. The final centrifugation run is...protein and phenol may be made one time with 1X phosphate diluent. Bioburden is tested after any adjustment is made and prior to sterile filtration

  14. Reduction of Microbial Contaminants in Drinking Water by Ultraviolet Light Technology: ETS UV MODEL UVL-200-4 (Report and Statement)

    EPA Science Inventory

    Final technical report provides test methods used and verification results to be published on ETV web sites. The ETS UV System Model UVL-200-4 was tested to validate the UV dose delivered by the system using biodosimetry and a set line approach. The set line for 40 mJ/cm2 Red...

  15. Addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  16. Final report on decommissioning of wells, boreholes, and tiltmeter sites, Gulf Coast Interior Salt Domes of Louisiana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-07-01

    In the late 1970s, test holes were drilled in northern Louisiana in the vicinity of Vacherie and Rayburn`s Salt Domes as part of the Department of Energy`s (DOE) National Waste Terminal Storage (NWTS) (rename the Civilian Radioactive Waste Management (CRWM)) program. The purpose of the program was to evaluate the suitability of salt domes for long term storage or disposal of high-level nuclear waste. The Institute for Environmental Studies at Louisiana State University (IES/LSU) and Law Engineering Testing Company (LETCo) of Marietta, Georgia performed the initial field studies. In 1982, DOE awarded a contract to the Earth Technology Corporation (TETC)more » of Long Beach, California to continue the Gulf Coast Salt Dome studies. In 1986, DOE deferred salt domes from further consideration as repository sites. This report describes test well plugging and site abandonment activities performed by SWEC in accordance with Activity Plan (AP) 1--3, Well Plugging and Site Restoration of Work Sites in Louisiana. The objective of the work outlined in this AP was to return test sites to as near original condition as possible by plugging boreholes, removing equipment, regrading, and seeding. Appendices to this report contain forms required by State of Louisiana, used by SWEC to document decommissioning activities, and pertinent documentation related to lease/access agreements.« less

  17. Corrective Action Investigation Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-08-01

    CAU 104 comprises the 15 CASs listed below: (1) 07-23-03, Atmospheric Test Site T-7C; (2) 07-23-04, Atmospheric Test Site T7-1; (3) 07-23-05, Atmospheric Test Site; (4) 07-23-06, Atmospheric Test Site T7-5a; (5) 07-23-07, Atmospheric Test Site - Dog (T-S); (6) 07-23-08, Atmospheric Test Site - Baker (T-S); (7) 07-23-09, Atmospheric Test Site - Charlie (T-S); (8) 07-23-10, Atmospheric Test Site - Dixie; (9) 07-23-11, Atmospheric Test Site - Dixie; (10) 07-23-12, Atmospheric Test Site - Charlie (Bus); (11) 07-23-13, Atmospheric Test Site - Baker (Buster); (12) 07-23-14, Atmospheric Test Site - Ruth; (13) 07-23-15, Atmospheric Test Site T7-4; (14) 07-23-16,more » Atmospheric Test Site B7-b; (15) 07-23-17, Atmospheric Test Site - Climax These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 28, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 104. The releases at CAU 104 consist of surface-deposited radionuclides from 30 atmospheric nuclear tests. The presence and nature of contamination at CAU 104 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) to the dose-based final action level (FAL). The presence of TED exceeding the FAL is considered a radiological contaminant of concern (COC). Anything identified as a COC will require corrective action. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters will be used to measure external radiological dose. Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plume, it was determined that the releases from the nuclear tests are co-located and will be investigated concurrently. A field investigation will be performed to define areas where TED exceeds the FAL and to determine whether other COCs are present at the site. The investigation will also collect information to determine the presence and nature of contamination associated with migration and excavation, as well as any potential releases discovered during the investigation. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less

  18. Automated training site selection for large-area remote-sensing image analysis

    NASA Astrophysics Data System (ADS)

    McCaffrey, Thomas M.; Franklin, Steven E.

    1993-11-01

    A computer program is presented to select training sites automatically from remotely sensed digital imagery. The basic ideas are to guide the image analyst through the process of selecting typical and representative areas for large-area image classifications by minimizing bias, and to provide an initial list of potential classes for which training sites are required to develop a classification scheme or to verify classification accuracy. Reducing subjectivity in training site selection is achieved by using a purely statistical selection of homogeneous sites which then can be compared to field knowledge, aerial photography, or other remote-sensing imagery and ancillary data to arrive at a final selection of sites to be used to train the classification decision rules. The selection of the homogeneous sites uses simple tests based on the coefficient of variance, the F-statistic, and the Student's i-statistic. Comparisons of site means are conducted with a linear growing list of previously located homogeneous pixels. The program supports a common pixel-interleaved digital image format and has been tested on aerial and satellite optical imagery. The program is coded efficiently in the C programming language and was developed under AIX-Unix on an IBM RISC 6000 24-bit color workstation.

  19. Web vulnerability study of online pharmacy sites.

    PubMed

    Kuzma, Joanne

    2011-01-01

    Consumers are increasingly using online pharmacies, but these sites may not provide an adequate level of security with the consumers' personal data. There is a gap in this research addressing the problems of security vulnerabilities in this industry. The objective is to identify the level of web application security vulnerabilities in online pharmacies and the common types of flaws, thus expanding on prior studies. Technical, managerial and legal recommendations on how to mitigate security issues are presented. The proposed four-step method first consists of choosing an online testing tool. The next steps involve choosing a list of 60 online pharmacy sites to test, and then running the software analysis to compile a list of flaws. Finally, an in-depth analysis is performed on the types of web application vulnerabilities. The majority of sites had serious vulnerabilities, with the majority of flaws being cross-site scripting or old versions of software that have not been updated. A method is proposed for the securing of web pharmacy sites, using a multi-phased approach of technical and managerial techniques together with a thorough understanding of national legal requirements for securing systems.

  20. Beach Point Test Site, Aberdeen Proving Ground, Edgewood Area, Maryland. Focused Feasibility Study, Final Project Work Plan

    DTIC Science & Technology

    1993-10-01

    Disposal Act (SWDA)/Resource Conservation and Recovery Act (RCRA). Jacobs Englnwfng Gmo Inc FINAL PROJECT WORK PLAN Washington Operatvo 8~ Fs 2-551I Date...shaded map of contaminated areas defined by chemical data, more than one map may be consructed f special and grapk cons *tft ame encountered. Results...that a Siophysical c ao p Pro rma down the axis or Beah PointS using geophysic teehnozoglosts that are •vi subsurface hyd&rosAdgraphic cmal beneath

  1. Final Environmental Assessment for Proposed Additional Development, Testing Use, and Associated Training at the Technical Evaluation Assessment Monitor Site (TEAMS) at Kirtland Air Force Base, New Mexico

    DTIC Science & Technology

    2015-02-01

    supply, sanitary sewage/wastewater, storm water handling, and communications systems. Solid waste TEAMS Final Environmental Assessment Kirtland...appropriately sanitized prior to being placed back into service. This will ensure safety of the water system. Sanitary Sewer/Wastewater System. Kirtland...AFB does not have its own sewage treatment plant. Instead, the sanitary sewer system of Kirtland AFB transports wastewater to the city of

  2. Final Environmental Assessment of the Joint Air-to-Surface Stand-Off Missile (JASSM) Development and Evaluation Testing, White Sands Missile Range, New Mexico

    DTIC Science & Technology

    2001-12-01

    Explosive Test Site Program Definition and Risk Reduction Permissible Exposure Limit Program Executive Office Propellants, Explosives, and...each test vehicle is flown in the captive mode and critical systems are functioned to further remove risk of failure due to the flight environment...of other inferior missiles would require a larger number of missiles, at increased procurement costs and risk to aircraft and crew, in order to

  3. 40 CFR 228.15 - Dumping sites designated on a final basis.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Dumping sites designated on a final basis. 228.15 Section 228.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CRITERIA FOR THE MANAGEMENT OF DISPOSAL SITES FOR OCEAN DUMPING § 228.15 Dumping sites designated on a final basis. (a)(1) The sites...

  4. 40 CFR 228.15 - Dumping sites designated on a final basis.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Dumping sites designated on a final basis. 228.15 Section 228.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CRITERIA FOR THE MANAGEMENT OF DISPOSAL SITES FOR OCEAN DUMPING § 228.15 Dumping sites designated on a final basis. (a)(1) The sites...

  5. 40 CFR 228.15 - Dumping sites designated on a final basis.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Dumping sites designated on a final basis. 228.15 Section 228.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CRITERIA FOR THE MANAGEMENT OF DISPOSAL SITES FOR OCEAN DUMPING § 228.15 Dumping sites designated on a final basis. (a)(1) The sites...

  6. 40 CFR 228.15 - Dumping sites designated on a final basis.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Dumping sites designated on a final basis. 228.15 Section 228.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) OCEAN DUMPING CRITERIA FOR THE MANAGEMENT OF DISPOSAL SITES FOR OCEAN DUMPING § 228.15 Dumping sites designated on a final basis. (a)(1) The sites...

  7. Physical compatibility of plazomicin with select i.v. drugs during simulated Y-site administration.

    PubMed

    Asempa, Tomefa E; Avery, Lindsay M; Kidd, James M; Kuti, Joseph L; Nicolau, David P

    2018-06-12

    The results of a study to determine the physical compatibility of plazomicin sulfate solution during simulated Y-site administration with 92 i.v. drugs are reported. Plazomicin injection solution (500 mg/10 mL) was diluted in 0.9% sodium chloride or 5% dextrose for injection to a final volume of 50 mL (final plazomicin concentration, 24 mg/mL), consistent with a 15-mg/kg dose administered to an 80-kg patient (i.e., 1,200 mg). All other i.v. drugs were reconstituted according to manufacturers' recommendations and diluted with 0.9% sodium chloride or 5% dextrose for injection to the upper range of concentrations used clinically. Y-site conditions were simulated by mixing 5 mL of plazomicin solution with 5 mL of tested drug solutions in a 1:1 ratio. Solutions were assessed for visual (via color and Tyndall beam testing), turbidity (using a laboratory-grade turbidimeter), and pH changes over a 60-minute observation period. Incompatibility was defined a priori as precipitation, color change, a positive Tyndall test, or a turbidity change of ≥0.5 nephelometric turbidity units at any time during the 60-minute observation period. Plazomicin was physically compatible with 79 of the 92 drugs tested. Determinations of physical incompatibility with plazomicin were made for 13 drugs: albumin, amiodarone, amphotericin B deoxycholate, anidulafungin, calcium chloride, daptomycin, esomeprazole, heparin, levofloxacin, methylprednisolone, micafungin, phenytoin, and propofol, CONCLUSION: Plazomicin at a concentration of 24 mg/mL was physically compatible with 85% of the drugs tested, including 31 of 36 antimicrobial agents. Copyright © 2018 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  8. Final Environmental Assessment for Proposed Enhanced Testing and Associated Training Use of the Giant Reusable Air Blast Simulator (GRABS) Site at Kirtland Air Force Base, New Mexico

    DTIC Science & Technology

    2015-02-01

    Sustainable design measures such as the use of “green” technology (e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green...explosive test events. During a I ,000 pounds explosive test event, the sound pressure level can cause tinnitus ( ringing of the ears) with a temporary...quality. ln additional, biological simulant testing would only occur when winds are from the south; ensuring lands off the installation would be

  9. SUPERFUND TREATABILITY CLEARINGHOUSE: BDAT INCINERATION OF CERCLA SARMS AT THE JOHN ZINK COMPANY TEST FACILITY (FINAL PROJECT REPORT)

    EPA Science Inventory

    This report presents the results of a treatability study of rotary kiln incineration of a synthetic "Superfund soil" bearing a wide range of chemical contaminants typically occurring at Superfund sites. This surrogate soil is referred to as a synthetic analytical reference ...

  10. Usability Evaluation of Public Web Mapping Sites

    NASA Astrophysics Data System (ADS)

    Wang, C.

    2014-04-01

    Web mapping sites are interactive maps that are accessed via Webpages. With the rapid development of Internet and Geographic Information System (GIS) field, public web mapping sites are not foreign to people. Nowadays, people use these web mapping sites for various reasons, in that increasing maps and related map services of web mapping sites are freely available for end users. Thus, increased users of web mapping sites led to more usability studies. Usability Engineering (UE), for instance, is an approach for analyzing and improving the usability of websites through examining and evaluating an interface. In this research, UE method was employed to explore usability problems of four public web mapping sites, analyze the problems quantitatively and provide guidelines for future design based on the test results. Firstly, the development progress for usability studies were described, and simultaneously several usability evaluation methods such as Usability Engineering (UE), User-Centered Design (UCD) and Human-Computer Interaction (HCI) were generally introduced. Then the method and procedure of experiments for the usability test were presented in detail. In this usability evaluation experiment, four public web mapping sites (Google Maps, Bing maps, Mapquest, Yahoo Maps) were chosen as the testing websites. And 42 people, who having different GIS skills (test users or experts), gender (male or female), age and nationality, participated in this test to complete the several test tasks in different teams. The test comprised three parts: a pretest background information questionnaire, several test tasks for quantitative statistics and progress analysis, and a posttest questionnaire. The pretest and posttest questionnaires focused on gaining the verbal explanation of their actions qualitatively. And the design for test tasks targeted at gathering quantitative data for the errors and problems of the websites. Then, the results mainly from the test part were analyzed. The success rate from different public web mapping sites was calculated and compared, and displayed by the means of diagram. And the answers from questionnaires were also classified and organized in this part. Moreover, based on the analysis, this paper expands the discussion about the layout, map visualization, map tools, search logic and etc. Finally, this paper closed with some valuable guidelines and suggestions for the design of public web mapping sites. Also, limitations for this research stated in the end.

  11. Dutch X-band SLAR calibration

    NASA Technical Reports Server (NTRS)

    Groot, J. S.

    1990-01-01

    In August 1989 the NASA/JPL airborne P/L/C-band DC-8 SAR participated in several remote sensing campaigns in Europe. Amongst other test sites, data were obtained of the Flevopolder test site in the Netherlands on August the 16th. The Dutch X-band SLAR was flown on the same date and imaged parts of the same area as the SAR. To calibrate the two imaging radars a set of 33 calibration devices was deployed. 16 trihedrals were used to calibrate a part of the SLAR data. This short paper outlines the X-band SLAR characteristics, the experimental set-up and the calibration method used to calibrate the SLAR data. Finally some preliminary results are given.

  12. Final Remedial Investigation Report Area of Contamination (AOC) 57. Volume III. Appendices E through Q

    DTIC Science & Technology

    2000-06-01

    ý 7/’ 2 /. j6 -0, -0 ý DATE OF TEST /___ ’__..__ TY’PE OF TEST Aede t4I HERMIT TYPE /SERIAL# )/,’ - _,__ _ TEST# 00- #v DATA COLLECTION RATE Zo...OF TEST " . (z) HERMIT TYPE /SERIAL# / C 7/k’- __ _ _ TEST# 2 -03 _0 DATA COLLEC17ION RATE ’ZO& 01 TRANSDUCER SERIAL # 66 3ý PSIG 30 ;S7r-: SCALE...INC. - ~FILE TYPE SITE TYPE JOB J94- 2 FIELD DATA RECORD - GROUNDWATER 4z=) NUMBER JECT [ USAEC-FT. DEVENS 7 WEATHER I v c_ LOCATION ISTART FIELD

  13. Superfund record of decision (EPA Region 5): Spickler Landfill, Spencer, WI. (First remedial action), June 1992. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 10-acre Spickler Landfill site is an inactive municipal and industrial landfill located in Spencer, Marathon County, Wisconsin. The site consists of a mercury brine pit and two fill areas called the Old and New Fill Areas. In 1974, the state ordered the owners of the site to terminate operations and close the landfill. The ROD provides a final remedy for the first operable unit (OU1), which consists of the mercury brine pit, and the landfill. The primary contaminants of concern affecting the soil and sludge are VOCs, including benzene, PCE, toluene, and xylenes; other organics, including pesticides; metals, includingmore » arsenic, chromium, and lead; and other inorganics, including asbestos. The selected remedial action for the operable unit includes solidifying and/or stabilizing wastes in the mercury brine pit based on treatability test results, followed by installing and maintaining an impermeable and a solid waste cap over the New and Old Fill areas.« less

  14. Contained rocket motor burn demonstrations in X-tunnel: Final report for the DoD/DOE Joint Demilitarization Technology Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    S. W. Allendorf; B. W. Bellow; R. f. Boehm

    Three low-pressure rocket motor propellant burn tests were performed in a large, sealed test chamber located at the X-tunnel complex on the Department of Energy's Nevada Test Site in the period May--June 1997. NIKE rocket motors containing double base propellant were used in two tests (two and four motors, respectively), and the third test used two improved HAWK rocket motors containing composite propellant. The preliminary containment safety calculations, the crack and burn procedures used in each test, and the results of various measurements made during and after each test are all summarized and collected in this document.

  15. Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, andmore » signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  16. Addendum 2 to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, Revison 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  17. The effects of Web site structure: the role of personal difference.

    PubMed

    Chung, Hwiman; Ahn, Euijin

    2007-12-01

    This study examined the effects of Web site structures in terms of advertising effectiveness- memory, attitude, and behavioral intentions. The primary research question for this study is, What type of Web site (Web ad) structure is most effective? In the pilot study, we tested the difference between two Web site structures, linear and interactive, in terms of traditional advertising effectiveness. Results from the pilot study did not support our research expectations. However, differences in terms of memory were noted between the two structures. After re-creating the Web site based on subjects' comments, in the final experiment, we examined the differences between the two structures and the moderating role of personality difference on the effects of Web site structure. The results confirm that participants' attitude, memory, and behavioral intentions were affected differently by the different Web site structures. However, some research hypotheses were not supported by the current data.

  18. Acid production potentials of massive sulfide minerals and lead-zinc mine tailings: a medium-term study.

    PubMed

    Çelebi, Emin Ender; Öncel, Mehmet Salim; Kobya, Mehmet

    2018-01-01

    Weathering of sulfide minerals is a principal source of acid generation. To determine acid-forming potentials of sulfide-bearing materials, two basic approaches named static and kinetic tests are available. Static tests are short-term, and easily undertaken within a few days and in a laboratory. In contrast, kinetic tests are long-term procedures and mostly carried out on site. In this study, experiments were conducted over a medium-term period of 2 months, not as short as static tests and also not as long as kinetic tests. As a result, pH and electrical conductivity oscillations as a function of time, acid-forming potentials and elemental contents of synthetically prepared rainwater leachates of massive sulfides and sulfide-bearing lead-zinc tailings from abandoned and currently used deposition areas have been determined. Although the lowest final pH of 2.70 was obtained in massive pyrite leachate, massive chalcopyrite leachate showed the highest titrable acidity of 1.764 g H 2 SO 4 /L. On the other hand, a composite of currently deposited mine tailings showed no acidic characteristic with a final pH of 7.77. The composite abandoned mine tailing leachate had a final pH of 6.70, close to the final pH of massive galena and sphalerite leachates, and produced a slight titrable acidity of 0.130 g H 2 SO 4 /L.

  19. Decomposing the Site Frequency Spectrum: The Impact of Tree Topology on Neutrality Tests.

    PubMed

    Ferretti, Luca; Ledda, Alice; Wiehe, Thomas; Achaz, Guillaume; Ramos-Onsins, Sebastian E

    2017-09-01

    We investigate the dependence of the site frequency spectrum on the topological structure of genealogical trees. We show that basic population genetic statistics, for instance, estimators of θ or neutrality tests such as Tajima's D , can be decomposed into components of waiting times between coalescent events and of tree topology. Our results clarify the relative impact of the two components on these statistics. We provide a rigorous interpretation of positive or negative values of an important class of neutrality tests in terms of the underlying tree shape. In particular, we show that values of Tajima's D and Fay and Wu's H depend in a direct way on a peculiar measure of tree balance, which is mostly determined by the root balance of the tree. We present a new test for selection in the same class as Fay and Wu's H and discuss its interpretation and power. Finally, we determine the trees corresponding to extreme expected values of these neutrality tests and present formulas for these extreme values as a function of sample size and number of segregating sites. Copyright © 2017 by the Genetics Society of America.

  20. The Potential of Environmental Sensors for Improving the Mobility Performance of Mainstream Blind Students. Final Report.

    ERIC Educational Resources Information Center

    Weisgerber, Robert A.; deHaas, Carla

    The report describes an effort to develop and test instructional materials, techniques and procedures - ESSETS (environmental sensing, selection, evaluation and training system) - for teaching functionally blind young adults to use electronic travel aids (ETAs). Considered are development of training guidelines, field site selection and instructor…

  1. Distribution of end bearing, tip shear and rotation on drilled shafts with combined loading in Florida limestone : final report, May 2008.

    DOT National Transportation Integrated Search

    2008-05-01

    The study investigated the behavior of large diameter drilled shafts embedded short distances in Florida Limestone (i.e. L/D=1 &3). The work was performed via laboratory (centrifuge) tests and at two field sites (17th Street and Fuller Warren Bridges...

  2. ISSOE Student Guidance and Development of Personalized Occupational Education Programs. Findings and Recommendations, Final Report.

    ERIC Educational Resources Information Center

    Beuke, Vernon; Frank, Robert

    The Instructional Support System for Occupational Education (ISSOE) project focused on (1) review of individualized education systems, (2) selection of appropriate occupational clusters, and (3) development and field testing of a system and materials. Exemplary and innovative approaches to individualized education were reviewed by site visits and…

  3. Time rate of local scour at complex bridge piers field and laboratory analyses : final report, April 2009.

    DOT National Transportation Integrated Search

    2009-04-01

    A local scour evolution field study was conducted under this contract. One of the piers on the A1A Bridge over the Intracoastal Waterway (ICCW) in Fort Pierce, Florida was selected for the test site. The existing local scour hole was filled with sand...

  4. Adaptation of Instructional Materials for Use with Mainstreamed Students. Final Report.

    ERIC Educational Resources Information Center

    Macro Systems, Inc., Silver Spring, MD.

    The report documents a project to adapt and design instructional media and materials of a regular senior high social studies curriculum for use with mainstreamed mildly handicapped students. Supplementary materials were developed and tested at five sites to accompany the world history textbook, "Our Common Heritage." Products included the…

  5. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  6. Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  7. Innovative Field Methods for Characterizing the Hydraulic Properties of a Complex Fractured Rock Aquifer (Ploemeur, Brittany)

    NASA Astrophysics Data System (ADS)

    Bour, O.; Le Borgne, T.; Longuevergne, L.; Lavenant, N.; Jimenez-Martinez, J.; De Dreuzy, J. R.; Schuite, J.; Boudin, F.; Labasque, T.; Aquilina, L.

    2014-12-01

    Characterizing the hydraulic properties of heterogeneous and complex aquifers often requires field scale investigations at multiple space and time scales to better constrain hydraulic property estimates. Here, we present and discuss results from the site of Ploemeur (Brittany, France) where complementary hydrological and geophysical approaches have been combined to characterize the hydrogeological functioning of this highly fractured crystalline rock aquifer. In particular, we show how cross-borehole flowmeter tests, pumping tests and frequency domain analysis of groundwater levels allow quantifying the hydraulic properties of the aquifer at different scales. In complement, we used groundwater temperature as an excellent tracer for characterizing groundwater flow. At the site scale, measurements of ground surface deformation through long-base tiltmeters provide robust estimates of aquifer storage and allow identifying the active structures where groundwater pressure changes occur, including those acting during recharge process. Finally, a numerical model of the site that combines hydraulic data and groundwater ages confirms the geometry of this complex aquifer and the consistency of the different datasets. The Ploemeur site, which has been used for water supply at a rate of about 106 m3 per year since 1991, belongs to the French network of hydrogeological sites H+ and is currently used for monitoring groundwater changes and testing innovative field methods.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, R.B.

    This is the final progress report of a Department of Energy (DOE), Nevada operations Office (NV), program to monitor the ecology of the Nevada Test Site (NTS). The eight-year Basic Environmental Compliance and Monitoring Program (BECAMP) included meeting goals of understanding the spatial and temporal changes of plants and animals on the NTS, and determining the effects of DOE operations on those plants and animals. Determination of the changes was addressed through monitoring the most common plant and animal species at undisturbed (baseline) plots located in the major NTS valleys and mesas. One plot in Yucca Flat, the site ofmore » most nuclear weapons tests, was monitored annually, while other baseline plots were censused on a three- or four-year cycle. Effects of DOE operations were examined at sites of major disturbances, related to both DOE operations and natural disturbance mechanisms, censused on a three-year cycle. This report concentrates on work completed in 1994.« less

  9. Interpretation of time-domain electromagnetic soundings in the Calico Hills area, Nevada Test Site, Nye County, Nevada

    NASA Astrophysics Data System (ADS)

    Kauahikaua, J.

    A controlled source, time domain electromagnetic (TDEM) sounding survey was conducted in the Calico Hills area of the Nevada Test Site (NTS). The geoelectric structure was determined as an aid in the evaluation of the site for possible future storage of spent nuclear fuel or high level nuclear waste. The data were initially interpreted with a simple scheme that produces an apparent resistivity versus depth curve from the vertical magnetic field data. These curves are qualitatively interpreted much like standard Schlumberger resistivity sounding curves. Final interpretation made use of a layered earth Marquardt inversion computer program. The results combined with those from a set of Schlumberger soundings in the area show that there is a moderately resistive basement at a depth no greater than 800 meters. The basement resistivity is greater than 100 ohm meters.

  10. Hardware test program for evaluation of baseline range/range rate sensor concept

    NASA Technical Reports Server (NTRS)

    Pernic, E.

    1985-01-01

    The test program Phase II effort provides additional design information in terms of range and range rate (R/R) sensor performance when observing and tracking a typical spacecraft target. The target used in the test program was a one-third scale model of the Hubble Space Telescope (HST) available at the MSFC test site where the tests were performed. A modified Bendix millimeter wave radar served as the R/R sensor test bed for evaluation of range and range rate tracking performance, and generation of radar signature characteristics of the spacecraft target. A summary of program test results and conclusions are presented along with detailed description of the Bendix test bed radar with accompaning instrumentation. The MSFC test site and facilities are described. The test procedures used to establish background levels, and the calibration procedures used in the range accuracy tests and RCS (radar cross section) signature measurements, are presented and a condensed version of the daily log kept during the 5 September through 17 September test period is also presented. The test program results are given starting with the RCS signature measurements, then continuing with range measurement accuracy test results and finally the range and range rate tracking accuracy test results.

  11. Archaeological data recovery at drill pad U19au, Nye County, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henton, G.H.; Pippin, L.C.

    1991-01-01

    Construction activities accompanying underground nuclear tests result in the disturbance of the surface terrain at the Nevada Test Site. In compliance with Federal legislation (National Historic Preservation Act of 1966 (PL 89-665) and National Environmental Policy Act of 1969 (PL 91-190)), the US Department of Energy (DOE), Field Office, Nevada, has long required that cultural resources studies must precede all land-disturbing activities on the Nevada Test Site. In accordance with 36 CFR Part 800, these studies consist of archaeological surveys conducted prior to the land-disturbing activities. The intent of these surveys is to identify and evaluate all cultural resources thatmore » might be adversely affected by the proposed construction activity. This report presents the final analysis of the data recovered from archaeological investigations conducted at the U19au drill site and access road. This report includes descriptions of the archaeological sites as recorded during the original survey, the research design used to guide the investigations, the method and techniques used to collect and analyze the data, and the results and interpretations of the analysis. 200 refs., 112 figs., 53 tabs.« less

  12. Site operator program final report for fiscal years 1992 through 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Francfort, J.E.; Bassett, R.R.; Birasco, S.

    The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testingmore » included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.« less

  13. Offshore Wind Turbines - Estimated Noise from Offshore Wind Turbine, Monhegan Island, Maine: Environmental Effects of Offshore Wind Energy Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aker, Pamela M.; Jones, Anthony M.; Copping, Andrea E.

    2010-11-23

    Deep C Wind, a consortium headed by the University of Maine will test the first U.S. offshore wind platforms in 2012. In advance of final siting and permitting of the test turbines off Monhegan Island, residents of the island off Maine require reassurance that the noise levels from the test turbines will not disturb them. Pacific Northwest National Laboratory, at the request of the University of Maine, and with the support of the U.S. Department of Energy Wind Program, modeled the acoustic output of the planned test turbines.

  14. Final Environmental Assessment for Minuteman III Modification

    DTIC Science & Technology

    2004-12-30

    the ocean floor. FONSI-3 At USAKA, target sites for test RVs are located in the deep ocean area east of the Kwajalein reef or in the vicinity...an RV impacts directly on Illeginni Island or in the shallow coral reefs of Kwajalein Atoll, a crater will form. Post-test debris recovery and... coral reef habitat. The USAF has projected that approximately four to five RVs will impact at Illeginni over the next 20 years. The overall effects

  15. Phase II Historic Resources Survey Archaeological Testing of Site 9FU416 Fulton County, Georgia

    DTIC Science & Technology

    2003-06-01

    Archaeological Park, Moundville, Alabama ) for final curation. 6 Phase 11 Testing 9FUJ 416 Chapter 3. Environmental and Cultural Overview Human...Corps of Engineers, Mobile District PO Box 2288 Mobile, Alabama 36628-0001 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING...MONITORING AGENCY REPORT NUMBER US Army Corps of Engineers, Mobile District PO Box 2288 Mobile, Alabama 36628-0001 1I. SUPPLEMENTARY NOTES DISTIR 11IT!O N

  16. Cell specific radiation dosimetry in skeleton from life-span carcinogenesis studies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Webster, S.S.J.

    1993-04-05

    The osteogenic sarcoma is the dominant life-threatening pathology in lifespan studies of beagles exposed to alpha-emitting bone-seeking radionuclides. It was deduced from these studies that certain skeletal sites are more prone to develop tumors. This project sought to determine the bone cells at risk and their cell-specific radiation dose. The cell-specific radiation dose values are related to loss and high Ra-226 and Pu-239 induced osteogenic sarcoma sites, to test different dose response hypothesis and predict the extent of effects in humans.

  17. Improving Education in Medical Statistics: Implementing a Blended Learning Model in the Existing Curriculum

    PubMed Central

    Milic, Natasa M.; Trajkovic, Goran Z.; Bukumiric, Zoran M.; Cirkovic, Andja; Nikolic, Ivan M.; Milin, Jelena S.; Milic, Nikola V.; Savic, Marko D.; Corac, Aleksandar M.; Marinkovic, Jelena M.; Stanisavljevic, Dejana M.

    2016-01-01

    Background Although recent studies report on the benefits of blended learning in improving medical student education, there is still no empirical evidence on the relative effectiveness of blended over traditional learning approaches in medical statistics. We implemented blended along with on-site (i.e. face-to-face) learning to further assess the potential value of web-based learning in medical statistics. Methods This was a prospective study conducted with third year medical undergraduate students attending the Faculty of Medicine, University of Belgrade, who passed (440 of 545) the final exam of the obligatory introductory statistics course during 2013–14. Student statistics achievements were stratified based on the two methods of education delivery: blended learning and on-site learning. Blended learning included a combination of face-to-face and distance learning methodologies integrated into a single course. Results Mean exam scores for the blended learning student group were higher than for the on-site student group for both final statistics score (89.36±6.60 vs. 86.06±8.48; p = 0.001) and knowledge test score (7.88±1.30 vs. 7.51±1.36; p = 0.023) with a medium effect size. There were no differences in sex or study duration between the groups. Current grade point average (GPA) was higher in the blended group. In a multivariable regression model, current GPA and knowledge test scores were associated with the final statistics score after adjusting for study duration and learning modality (p<0.001). Conclusion This study provides empirical evidence to support educator decisions to implement different learning environments for teaching medical statistics to undergraduate medical students. Blended and on-site training formats led to similar knowledge acquisition; however, students with higher GPA preferred the technology assisted learning format. Implementation of blended learning approaches can be considered an attractive, cost-effective, and efficient alternative to traditional classroom training in medical statistics. PMID:26859832

  18. Improving Education in Medical Statistics: Implementing a Blended Learning Model in the Existing Curriculum.

    PubMed

    Milic, Natasa M; Trajkovic, Goran Z; Bukumiric, Zoran M; Cirkovic, Andja; Nikolic, Ivan M; Milin, Jelena S; Milic, Nikola V; Savic, Marko D; Corac, Aleksandar M; Marinkovic, Jelena M; Stanisavljevic, Dejana M

    2016-01-01

    Although recent studies report on the benefits of blended learning in improving medical student education, there is still no empirical evidence on the relative effectiveness of blended over traditional learning approaches in medical statistics. We implemented blended along with on-site (i.e. face-to-face) learning to further assess the potential value of web-based learning in medical statistics. This was a prospective study conducted with third year medical undergraduate students attending the Faculty of Medicine, University of Belgrade, who passed (440 of 545) the final exam of the obligatory introductory statistics course during 2013-14. Student statistics achievements were stratified based on the two methods of education delivery: blended learning and on-site learning. Blended learning included a combination of face-to-face and distance learning methodologies integrated into a single course. Mean exam scores for the blended learning student group were higher than for the on-site student group for both final statistics score (89.36±6.60 vs. 86.06±8.48; p = 0.001) and knowledge test score (7.88±1.30 vs. 7.51±1.36; p = 0.023) with a medium effect size. There were no differences in sex or study duration between the groups. Current grade point average (GPA) was higher in the blended group. In a multivariable regression model, current GPA and knowledge test scores were associated with the final statistics score after adjusting for study duration and learning modality (p<0.001). This study provides empirical evidence to support educator decisions to implement different learning environments for teaching medical statistics to undergraduate medical students. Blended and on-site training formats led to similar knowledge acquisition; however, students with higher GPA preferred the technology assisted learning format. Implementation of blended learning approaches can be considered an attractive, cost-effective, and efficient alternative to traditional classroom training in medical statistics.

  19. Development of a design basis tornado and structural design criteria for the Nevada Test Site, Nevada. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, J.R.; Minor, J.E.; Mehta, K.C.

    1975-06-01

    In order to evaluate the ability of critical facilities at the Nevada Test Site to withstand the possible damaging effects of extreme winds and tornadoes, parameters for the effects of tornadoes and extreme winds and structural design criteria for the design and evaluation of structures were developed. The meteorological investigations conducted are summarized, and techniques used for developing the combined tornado and extreme wind risk model are discussed. The guidelines for structural design include methods for calculating pressure distributions on walls and roofs of structures and methods for accommodating impact loads from wind-driven missiles. Calculations for determining the design loadsmore » for an example structure are included. (LCL)« less

  20. Identification and characterization of conservative organic tracers for use as hydrologic tracers for the Yucca Mountain site characterization study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stetzenbach, K.; Farnham, I.

    1996-06-01

    Extensive tracer testing is expected to take place at the C-well complex in the Nevada Test Site as part of the Yucca Mountain Site Characterization Project. The C-well complex consists of one pumping well, C3, and two injection wells, C1 and C2 into which tracer will be introduced. The goal of this research was to provide USGS with numerous tracers to completed these tests. Several classes of fluorinated organic acids have been evaluated. These include numerous isomers of fluorinated benzoic acids, cinnamic acids, and salicylic acids. Also several derivatives of 2-hydroxy nicotinic acid (pyridone) have been tested. The stability ofmore » these compounds was determined using batch and column tests. Ames testing (mutagenicity/carcinogenicity) was conducted on the fluorinated benzoic acids and a literature review of toxicity of the fluorobenzoates and three perfluoro aliphatic acids was prepared. Solubilities were measured and method development work was performed to optimize the detection of these compounds. A Quality Assurance (QA) Program was developed under existing DOE and USGS guidelines. The program includes QA procedures and technical standard operating procedures. A tracer test, using sodium iodide, was performed at the C-well complex. HRC chemists performed analyses on site, to provide real time data for the USGS hydrologists and in the laboratories at UNLV. Over 2,500 analyses were performed. This report provides the results of the laboratory experiments and literature reviews used to evaluate the potential tracers and reports on the results of the iodide C-well tracer test.« less

  1. Off-site smartphone reading of CT images for patients with inconclusive diagnoses of appendicitis from on-call radiologists.

    PubMed

    Seong, Nak Jong; Kim, Bohyoung; Lee, Sungmin; Park, Hee Sun; Kim, Hyuk Jung; Woo, Hyunsik; Kang, Heung-Sik; Lee, Kyoung Ho

    2014-07-01

    The purpose of this study was to simulate a mobile consultation in patients with inconclusive diagnosis of appendicitis made by on-call radiologists, as well as to measure the diagnostic confidence and performance of the mobile consultation. Two off-site abdominal radiologists interpreted the CT images from 68 patients (including 29 patients with confirmed appendicitis) on a smart-phone for whom the preliminary CT reports by 25 in-house on-call radiologists were inconclusive. The smartphone readings were compared with the preliminary reports by on-call radiologists and with the original final reports by in-house abdominal radiologists. Heat maps, kappa statistics, Wilcoxon signed-rank tests, and ROC curves were used for data analysis. The heat maps and kappa statistics showed that the smartphone readings were more similar to the final reports than to the preliminary reports. In diagnosing or ruling out appendicitis, the smartphone readings were more confident than the preliminary reports (p ≤ 0.01) and did not significantly differ in diagnostic confidence from the final reports (p ≥ 0.19). The AUCs of the smartphone readings (0.91 and 0.92) did not differ significantly from those of the preliminary (0.85) or final (0.97) reports (p ≥ 0.09). With the given study sample, the diagnostic performance of the off-site smartphone readings did not differ significantly from that of the in-house preliminary reports. However, the smartphone readings provided higher diagnostic confidence than the preliminary reports.

  2. UV Waterworks Outreach Support. Final Report

    DOE R&D Accomplishments Database

    Miller, P.

    1998-05-01

    A recently invented device uses UV light (254 nm) to inexpensively disinfect community drinking water supplies. Its novel features are: low cost (about US $600), robust design, rapid disinfection (12 seconds), low electricity use (40W), low maintenance (every 6 months), high flow rate (15 l/min) and ability to work with unpressurized water sources. The device could service a community of 1,000 persons, at an annual total cost of 14 cents US per person. This device has been tested in a number of independent laboratories worldwide. The laboratory tests have confirmed that the unit is capable of disinfecting waters to drinking water standards for bacteria and viruses. An extended field trial of the device began in South Africa in February 1997, with lab testing at the municipal water utility. A unit installed at the first field site, an AIDS hospice near Durban, has been in continuous operation since August, 1997. Additional test sites are being identified. The author describes the results of the initial lab tests, reports the most recent findings from the ongoing field test-monitoring program, and discusses plans for future tests.

  3. Development and Field-Test of an Instrument to Assess the Extent to Which a Vocational Educational Program Is Either Competency-Based or Conventional. Final Report from September 1, 1984 to August 31, 1985.

    ERIC Educational Resources Information Center

    University of Central Florida, Orlando. Coll. of Education.

    This report describes the production and pilot test of an assessment instrument for vocational education programs. The instrument was designed to be used following a site visit that includes a 30- to 45-minute interview with the program instructor and a 30-minute interview with one small group of students. Reliability and validity information was…

  4. Processing of 3-Dimensional Flash Lidar Terrain Images Generated From an Airborne Platform

    NASA Technical Reports Server (NTRS)

    Bulyshev, Alexander; Pierrottet, Diego; Amzajerdian, Farzin; Busch, George; Vanek, Michael; Reisse, Robert

    2009-01-01

    Data from the first Flight Test of the NASA Langley Flash Lidar system have been processed. Results of the analyses are presented and discussed. A digital elevation map of the test site is derived from the data, and is compared with the actual topography. The set of algorithms employed, starting from the initial data sorting, and continuing through to the final digital map classification is described. The accuracy, precision, and the spatial and angular resolution of the method are discussed.

  5. Beowawe Geothermal Area evaluation program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Iovenitti, J. L

    Several exploration programs were conducted at the Beowawe Geothermal Prospect, Lander and Eureka County, Nevada. Part I, consisting of a shallow temperature hole program, a mercury soil sampling survey, and a self-potential survey were conducted in order to select the optimum site for an exploratory well. Part II consisted of drilling a 5927-foot exploratory well, running geophysical logs, conducting a drill stem test (2937-3208 feet), and a short-term (3-day) flow test (1655-2188 feet). All basic data collected is summarized.

  6. Novel immunohistochemistry-based signatures to predict metastatic site of triple-negative breast cancers.

    PubMed

    Klimov, Sergey; Rida, Padmashree Cg; Aleskandarany, Mohammed A; Green, Andrew R; Ellis, Ian O; Janssen, Emiel Am; Rakha, Emad A; Aneja, Ritu

    2017-09-05

    Although distant metastasis (DM) in breast cancer (BC) is the most lethal form of recurrence and the most common underlying cause of cancer related deaths, the outcome following the development of DM is related to the site of metastasis. Triple negative BC (TNBC) is an aggressive form of BC characterised by early recurrences and high mortality. Athough multiple variables can be used to predict the risk of metastasis, few markers can predict the specific site of metastasis. This study aimed at identifying a biomarker signature to predict particular sites of DM in TNBC. A clinically annotated series of 322 TNBC were immunohistochemically stained with 133 biomarkers relevant to BC, to develop multibiomarker models for predicting metastasis to the bone, liver, lung and brain. Patients who experienced metastasis to each site were compared with those who did not, by gradually filtering the biomarker set via a two-tailed t-test and Cox univariate analyses. Biomarker combinations were finally ranked based on statistical significance, and evaluated in multivariable analyses. Our final models were able to stratify TNBC patients into high risk groups that showed over 5, 6, 7 and 8 times higher risk of developing metastasis to the bone, liver, lung and brain, respectively, than low-risk subgroups. These models for predicting site-specific metastasis retained significance following adjustment for tumour size, patient age and chemotherapy status. Our novel IHC-based biomarkers signatures, when assessed in primary TNBC tumours, enable prediction of specific sites of metastasis, and potentially unravel biomarkers previously unknown in site tropism.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baxter, Van D.; Munk, Jeffrey D.; Gehl, Anthony C.

    The field study is planned to continue through the 2016 cooling season with the draft final project report due by September 30, 2016. This report provides a description of both installations and preliminary 2015 cooling and fall season performance results for the Knoxville site. For the August 18 through December 14 period, the Knoxville site GS-IHP provided 53.6% total source energy savings compared to a baseline electric RTU/heat pump and electric WH. Peak demand savings ranged from 33% to 59% per month. Energy cost savings of 53.1% have been achieved to date with more than half of that coming frommore » reduced demand charges. Data on installation and maintenance costs are being collected and will be combined with total test period energy savings data for a payback analysis to be included in the project final report. The GS-IHP also saved a significant amount of carbon emissions. The total emission savings for the Knoxville site for the August-December 2015 period were ~0.8 metric tons. If trading for carbon credits ever becomes a reality, additional cost savings would be realized.« less

  8. Distribution of ion contents and microorganisms during the electro-bioremediation of petroleum-contaminated saline soil.

    PubMed

    Zhang, Meng; Guo, Shuhai; Li, Fengmei; Wu, Bo

    2017-10-15

    This study investigated the distribution of ion contents and microorganisms during the electro-bioremediation (EK-Bio) of petroleum-contaminated saline soil. The results showed that soil ions tend to accumulate around the electrodes, and the concentration was correlated with the distance from the electrodes. The average soil ion content was 7.92 g/kg around the electrodes (site A) and 0.55 g/kg at the furthest distance from the electrodes (site B) after 112 days of treatment, while the initial average content was 3.92 g/kg. Smooth linear (R 2 = 0.98) loss of soil ions was observed at site C, which was closer to the electrodes than site B, and had a final average soil ion content of 1.96 g/kg. The dehydrogenase activity was much higher in EK-Bio test soil than in the Bio test soil after 28 days of treatment, and followed the order: site C > site B > site A. However, the soil dehydrogenase activity dropped continuously when the soil ion reached very high and low concentrations at sites A and B. The soil microbial community varied in sample sites that had different ion contents, and the soil microbial diversity followed the order: site C > site B > site A. The applied electric field clearly enhanced the biodegradation efficiency for soil petroleum contaminants. However, the biodegradation promotion effects were weakening in soils where the ion contents were extremely high and low (sites A and B). These results can provide useful information for EK-Bioremediation of organic-contaminated saline soil.

  9. Addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grant Evenson

    This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pagesmore » of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  10. Final Report - Assessment of Testing Options for the NTR at the INL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Howe, Steven D; McLing, Travis L; McCurry, Michael

    One of the main technologies that can be developed to dramatically enhance the human exploration of space is the nuclear thermal rocket (NTR). Several studies over the past thirty years have shown that the NTR can reduce the cost of a lunar outpost, reduce the risk of a human mission to Mars, enable fast transits for most missions throughout the solar system, and reduce the cost and time for robotic probes to deep space. Three separate committees of the National Research Council of the National Academy of Sciences have recommended that NASA develop the NTR. One of the primary issuesmore » in development of the NTR is the ability to verify a flight ready unit. Three main methods can be used to validate safe operation of a NTR: 1) Full power, full duration test in an above ground facility that scrubs the rocket exhaust clean of any fission products; 2) Full power , full duration test using the Subsurface Active Filtering of Exhaust (SAFE) technique to capture the exhaust in subsurface strata; 3) Test of the reactor fuel at temperature and power density in a driver reactor with subsequent first test of the fully integrated NTR in space. The first method, the above ground facility, has been studied in the past. The second method, SAFE, has been examined for application at the Nevada Test Site. The third method relies on the fact that the Nuclear Furnace series of tests in 1971 showed that the radioactive exhaust coming from graphite based fuel for the NTR could be completely scrubbed of fission products and the clean hydrogen flared into the atmosphere. Under funding from the MSFC, the Center for Space Nuclear Research (CSNR) at the Idaho National laboratory (INL) has completed a reexamination of Methods 2 and 3 for implementation at the INL site. In short, the effort performed the following: 1) Assess the geology of the INL site and determine a location suitable SAFE testing; 2) Perform calculations of gas transport throughout the geology; 3) Produce a cost estimate of a non-nuclear , sub-scale test using gas injection to validate the computational models; 4) Produce a preliminary cost estimate to build a nuclear furnace equivalent facility to test NTR fuel on a green field location on the INL site. The results show that the INL geology is substantially better suited to the SAFE testing method than the NTS site. The existence of impermeable interbeds just above the sub-surface aquifer ensure that no material from the test, radioactive or not, can enter the water table. Similar beds located just below the surface will prevent any gaseous products from reaching the surface for dispersion. The extremely high permeability of the strata between the interbeds allows rapid dispersion of the rocket exhaust. In addition, the high permeability suggests that a lower back-pressure may develop in the hole against the rocket thrust, which increases safety of operations. Finally, the cost of performing a sub-scale, non-nuclear verification experiment was determined to be $3M. The third method was assessed through discussions with INL staff resident at the site. In essence, any new Category I facility on any DOE site will cost in excess of $250M. Based on the results of this study, a cost estimate for testing a nuclear rocket at the INL site appears to be warranted. Given the fact that a new nuclear fuel may be possible that does not release any fission products, the SAFE testing option appears to be the most affordable.« less

  11. On-Site inspections as a tool for nuclear explosion monitoring in the framework of the Comprehensive Nuclear Test Ban Treaty

    NASA Astrophysics Data System (ADS)

    Arndt, R.; Gaya-Pique, L.; Labak, P.; Tanaka, J.

    2009-04-01

    On-site inspections (OSIs) constitute the final verification measure under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). OSIs are launched to establish whether or not a nuclear explosion has been carried out, thus they are conducted to verify States' compliance with the Treaty. During such an inspection, facts are gathered within a limited investigation area of 1000 Km2 to identify possible violators of the Treaty. Time scale (referring both to the preparation of the inspection as well as to the conduct of an OSI itself) is one of the challenges that an inspection team has to face when conducting an OSI. Other challenges are the size of the team - which is limited to 40 inspectors - and political limitations imposed by the Treaty in the use of allowed techniques. The Integrated Field Exercise 2008 (IFE08) recently conducted in Kazakhstan was the first large-scale, as well as the most comprehensive, on site inspection exercise ever conducted by the Preparatory Commission of the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO). The exercise took place in a deserted area south east of Kurchatov, within the former Soviet Union's Semipalatinsk nuclear test site. In this paper we will provide an overview of the technical activities conducted by the inspection team during IFE08 in order to collect evidence for a hypothetical nuclear explosion test. The techniques applied can be distributed in four different blocks: visual observation (to look for man-made changes in the geomorphology as well as anthropogenic features related to an underground nuclear explosion, UNE); passive seismic monitoring (to identify possible aftershocks created by the UNE); radionuclide measurements (to collect evidence for radionuclide isotopes related to a nuclear explosion); and finally geophysical surveys (to identify geophysical signatures related to an UNE in terms of changes in the geological strata, to the hydrogeological regime, and in terms of the shallow remains of the infrastructure deployed during the preparation and monitoring of the test). The data collected during IFE08, together with data from previous exercises, set the fundaments of a database of invaluable value to be used by CTBTO in the future for a better understanding of the phenomenology related to a nuclear explosion.

  12. Design and Testing of a Method to Reach Agreement for Responsibilities in Collection Building Among Libraries. Final Report.

    ERIC Educational Resources Information Center

    Redfield, Gretchen

    As a first step towards resource sharing among libraries in the Cleveland Area Metropolitan Library System (CAMLS), a unique method, called the Site Appraisal for Area Resources Inventory (SAFARI), was developed to examine the library collections. This approach was different than others in that collections were compared by experts in a specific…

  13. Pressure treatment of robusta and ohia posts...final report

    Treesearch

    Roger G. Skolmen

    1973-01-01

    Round posts of ohia and robusta pressure-treated with one of two preservatives are being tested for durability at the Makiki Exposure Site, Honolulu, Hawaii. After more than 10½ years, all posts treated with pentachlorophenol are still sound. And all but one robusta post treated with chromated copper aresenate are still sound. Life of untreated posts of both species...

  14. NRC/AMRMC Resident Research Associateship Program

    DTIC Science & Technology

    2017-04-01

    final report. The productivity of these Associates is listed in the technical report. 15. SUBJECT TERMS- Associateship program, post -doc, awards 16...granting institutions in the United States; 4) posting announcements on internet job sites, electronic newsletters and professional society websites; 5...implemented in the testing and evaluation of medical countermeasures. SCHOLARLY PRODUCTIVITY ARTICLES - PEER REVIEWED Bixler, Sandra L; Bearss, Jeremy J

  15. Human Metabolism and Interactions of Deployment-Related Chemicals

    DTIC Science & Technology

    2003-08-01

    with individual test compounds (final concentration, 100 PM), agent pyridostigmine bromide to protect against possible nerve gas NADPH-generating system...an insect repellent (N,N-diethyl-m- toluamide) a nerve gas prophyllactic (pyridostigmine bromide) did not cause the inhibition of trans-permethrin...mechanism of organophosphorus anticholinesterase agents , namely; covalent modification of the active site of the esterases in question. Carbaryl, another

  16. Laboratory Investigation Of Containment In Underground Nuclear Tests.

    DTIC Science & Technology

    1982-02-15

    34 eSite 3181 I ~ 6 0.04 0.02 2 0 0 0.00 0.02 0.04 0.06 0.08 0.10 TIME FROM DETONATION - mst (b? REFLECTED IMPULSE FIGURE CA6 REFLECTED PRESSURE AND...neighborhood of the final elastic-plastic interface and as a result most of the wave propagation beyond PV2 was elastic. For the theoretical treatment

  17. Materials Technology: The Common Core Skills That are Shaping the Future. Final Performance Report. January 1, 1989-June 30, 1990.

    ERIC Educational Resources Information Center

    Battelle Pacific Northwest Laboratories, Richland, WA.

    A materials technology program was developed at Richland High School (Washington) and pilot tested at seven sites in Washington and Oregon. The program created partnerships between science and vocational education teachers at Richland High and Battelle Pacific Northwest Laboratories, and was then expanded to include other high schools, colleges,…

  18. Final Report: Sensorpedia Phases 1 and 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gorman, Bryan L; Resseguie, David R

    2010-08-01

    Over the past several years, ORNL has been actively involved in research to formalize the engineering principles and best practices behind emerging social media and social networking concepts to solve real-time data sharing problems for national security and defense, public health and safety, environmental and infrastructure awareness, and disaster preparedness and response. Sensorpedia, an ORNL web site, is a practical application of several key social media principles. Dubbed the Wikipedia for sensors, Sensorpedia is currently in limited BETA testing and was selected in 2009 by Federal Computer Week as one of the government s top 10 social networking sites.

  19. Superfund record of decision (EPA Region 5): Skinner Landfill, West Chester, OH, June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-04

    The decision document presents the selected final remedial action for the Skinner Landfill site in West Chester, Ohio. The remedy is the second and final of two operable units for this site. The first operable unit addressed immediate site concerns, through the construction of a fence around the contaminated area, and by offering an alternate supply of drinking water to the potentially affected users of groundwater. This final operable unit addresses potential future migration of site contaminants into the groundwater and will limit the potential for direct exposure of site contaminants to humans through source control measures.

  20. 78 FR 1143 - Explosive Siting Requirements; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... launch site operators in site planning for the storage and handling of energetic liquids and explosives...: For technical questions concerning this final rule, contact Yvonne Tran, Commercial Space... this final rule, contact Laura Montgomery, AGC 200, [[Page 1144

  1. Corrective Action Investigation Plan for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada with ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit (CAU) 541 is co-located on the boundary of Area 5 of the Nevada National Security Site and Range 65C of the Nevada Test and Training Range, approximately 65 miles northwest of Las Vegas, Nevada. CAU 541 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 541, which comprises the following corrective action sites (CASs): 05-23-04, Atmospheric Tests (6) - BFa Site; 05-45-03, Atmospheric Test Site - Small Boy. These sites are being investigated because existing information on the nature andmore » extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report. The sites will be investigated based on the data quality objectives (DQOs) developed on April 1, 2014, by representatives of the Nevada Division of Environmental Protection; U.S. Air Force; and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 541. The site investigation process also will be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with CASs 05-23-04 and 05-45-03 are from nuclear testing activities conducted at the Atmospheric Tests (6) - BFa Site and Atmospheric Test Site - Small Boy sites. The presence and nature of contamination at CAU 541 will be evaluated based on information collected from field investigations. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.« less

  2. Evaluation of a permeable reactive barrier technology for use at Rocky Flats Environmental Technology Site (RFETS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DWYER,BRIAN P.

    2000-01-01

    Three reactive materials were evaluated at laboratory scale to identify the optimum treatment reagent for use in a Permeable Reactive Barrier Treatment System at Rocky Flats Environmental Technology Site (RFETS). The contaminants of concern (COCS) are uranium, TCE, PCE, carbon tetrachloride, americium, and vinyl chloride. The three reactive media evaluated included high carbon steel iron filings, an iron-silica alloy in the form of a foam aggregate, and a peculiar humic acid based sorbent (Humasorb from Arctech) mixed with sand. Each material was tested in the laboratory at column scale using simulated site water. All three materials showed promise for themore » 903 Mound Site however, the iron filings were determined to be the least expensive media. In order to validate the laboratory results, the iron filings were further tested at a pilot scale (field columns) using actual site water. Pilot test results were similar to laboratory results; consequently, the iron filings were chosen for the fill-scale demonstration of the reactive barrier technology. Additional design parameters including saturated hydraulic conductivity, treatment residence time, and head loss across the media were also determined and provided to the design team in support of the final design. The final design was completed by the Corps of Engineers in 1997 and the system was constructed in the summer of 1998. The treatment system began fill operation in December, 1998 and despite a few problems has been operational since. Results to date are consistent with the lab and pilot scale findings, i.e., complete removal of the contaminants of concern (COCs) prior to discharge to meet RFETS cleanup requirements. Furthermore, it is fair to say at this point in time that laboratory developed design parameters for the reactive barrier technology are sufficient for fuel scale design; however,the treatment system longevity and the long-term fate of the contaminants are questions that remain unanswered. This project along with others such as the Durango, CO and Monticello, UT reactive barriers will provide the data to determine the long-term effectiveness and return on investment (ROI) for this technology for comparison to the baseline pump and treat.« less

  3. Mobilizable RDF/d-RDF burning program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niemann, K.; Campbell, J.

    1982-03-01

    The Mobilizable RDF/d-RDF Burning Program was conceived to promote the utilization of refuse-derived fuels (RDF) as a supplement to existing fossil fuel sources in industrial-sized boilers. The program explores the design, development, and eventual construction of densified-RDF (d-RDF) for use in boiler combustion testing as a supplement to stoker coal or wood wastes. The equipment would be mounted on trailers and assembled and operated at preselected sites throughout the country where approximately 750 tons of RDF would be produced and test burned in a local boiler. The equipment, to include a transportable RDF boiler metering and feed system, would thenmore » be moved and operated at two to three test sites annually. The program is intended to encourage the construction of permanent resource recovery facilities by involving local waste handling groups in operating the equipment and producing fuel, and potential local fuel users in testing the fuel in their boilers. The Mobilizable Program was developed from two separate tasks. The first task developed the concept behind the program and defined its operational and organizational structure. The second task, a follow-up to the first, was intended principally to finalize test locations, develop equipment designs and specifications, and formalize a management program. This report summarizes the principal findings of both tasks. It identifies the criteria used to identify test locations, outlines the program's management structure, presents design and performance specifications for both the fuel production equipment and boiler fuel feed systems, and provides a detailed evaluation of the parameters involved in burning RDF in industrial-sized boilers. Final conclusions and recommendations identify problem areas encountered in the program, and discuss possible future directions for such a program.« less

  4. Last SSME test on A-1

    NASA Image and Video Library

    2006-09-29

    The Stennis Space Center conducted the final space shuttle main engine test on its A-1 Test Stand Friday. The A-1 Test Stand was the site of the first test on a shuttle main engine in 1975. Stennis will continue testing shuttle main engines on its A-2 Test Stand through the end of the Space Shuttle Program in 2010. The A-1 stand begins a new chapter in its operational history in October. It will be temporarily decommissioned to convert it for testing the J-2X engine, which will power the upper stage of NASA's new crew launch vehicle, the Ares I. Although this ends the stand's work on the Space Shuttle Program, it will soon be used for the rocket that will carry America's next generation human spacecraft, Orion.

  5. Closure Report for CAU No. 430: Buried Depleted Uraniuim Artillery Round No. 1, Tonopah Test Range, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1997-02-25

    1.1 Purpose This Closure Report presents the information obtained from investigative actions performed to justify the decision for clean closure of CAU 430 through "No Further Action." The investigative actions were performed per the Streamlined Approach for Environmental Restoration Plan, CA UNO. 430: Buried Depleted Uranium Artille~ Round No. 1, Tonopah Test Range (DOE/NV, 1996a) (hereafter referred to as the SAFER Plan). The Buried DU Artillery Round No. 1 is located approximately 1.1 kilometers (km) (0.7 mile [mi]) south of Avenue 13 in the test area south of Area 9 (Figure 1-2). The site was thought to consist of amore » potentially unexploded W-79 Joint Test Assembly (JTA) test artillery projectile with high explosives (HE) and DU. The DU was substituted for Special Nuclear Material to prevent a nuclear explosion and yet retain the physical characteristics of uranium for ballistic and other mechanical tests. The projectile was reportedly buried in one pit, approximately 5 to 10 feet (ft) deep (Smith, 1993; Smith, 1996; Quas, 1996). The exact location of the burial pit is unknown; however, three disturbed areas (Sites A, B, and C) were identified through geophysical surveys, site visits, and employee interviews as possible locations of the test projectile (Figure 1-3). Results of the investigation are summarized within this Closure Report. Additional information about the site and investigation activities may be found in the SAFER Plan (DOE/NV, 1996a). 1.2 Scope The objectives of the SAFER Plan (DOE/NV, 1996a) activities were to prepare the site for closure through locating and identi~ing the projectile (Buried DU Artillery Round No. 1), destroying the projectile and any remaining components, collecting soil samples to detect residual contamination resulting from projectile destruction, and finally, remediating residual contamination.« less

  6. A study of the stress wave factor technique for the characterization of composite materials

    NASA Technical Reports Server (NTRS)

    Henneke, E. G., II; Duke, J. C., Jr.; Stinchcomb, W. W.; Govada, A.; Lemascon, A.

    1983-01-01

    A testing program was undertaken to provide an independent investigation and evaluation of the stress wave factor for characterizing the mechanical behavior of composite laminates. Some of the data which was obtained after performing a very large number of tests to determine the reproducibility of the SWF measurement is presented. It was determined that, with some optimizing of experimental parameters, the SWF value can be reproduced to within + or - 10%. Results are also given which show that, after careful calibration procedures, the lowest SWF value along the length of a specimen will correlate very closely to the site of final failure when the specimen is loaded in tension. Finally, using a moire interferometry technique, it was found that local regions having the highest in plane strains under tensile loading also had the lowest SWF values.

  7. Teaching Standard English as a Second Dialect to Primary School Children in Hilo, Hawaii. Volume I of II Volumes. Final Report.

    ERIC Educational Resources Information Center

    Peterson, Robert O. H.

    This document describes a four-year program designed to develop and test a method for teaching standard English to nonstandard dialect speakers in the first four grades of elementary school in Hilo, Hawaii. Chapters in this first volume are (1) Introduction, (2) Project Site and Evaluation Strategy, (3) Instrumentation, (4) Development of Lesson…

  8. FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-15

    The Yucca Mountain Site Characterization Project (YMP) of the US DOE is tasked with designing, constructing, and operating an Exploratory Studies Facility (ESF) at Yucca Mountain, Nevada. The purpose of the YMP is to provide detailed characterization of the Yucca Mountain site for the potential mined geologic repository for permanent disposal of high-level radioactive waste. Detailed characterization of properties of the site are to be conducted through a wide variety of short-term and long-term in-situ tests. Testing methods require the installation of a large number of test instruments and sensors with a variety of functions. These instruments produce analog andmore » digital data that must be collected, processed, stored, and evaluated in an attempt to predict performance of the repository. The Integrated Data and Control System (IDCS) is envisioned as a distributed data acquisition that electronically acquires and stores data from these test instruments. IDCS designers are responsible for designing and overseeing the procurement of the system, IDCS Operation and Maintenance operates and maintains the installed system, and the IDCS Data Manager is responsible for distribution of IDCS data to participants. This report is a compilation of trip reports, interoffice memos, and other memos relevant to Computer Applications Group, Inc., work on this project.« less

  9. Stressor Identification (Si) at Contaminated Sites: Upper Arkansas River, Colorado (Final)

    EPA Science Inventory

    EPA announced the availability of the final report, Stressor Identification (SI) at Contaminated Sites: Upper Arkansas River, Colorado. This report describes a causal assessment for impairments of plant growth and plant species richness at a terrestrial contaminated site ...

  10. Depigmentation with tert-butyl hydroquinone using black guinea pigs.

    PubMed

    Patrick, E; Juberg, D R; O'Donoghue, J; Maibach, H I

    1999-01-01

    tert-Butyl hydroquinone (TBHQ) has important and functional uses in consumer and commercial applications, some of which involve human exposure primarily through dermal contact. To assist in the safety evaluation of TBHQ, this study was conducted to determine whether TBHQ would produce changes in skin pigmentation after repeated dermal application to black guinea pigs. Hydroquinone (HQ) and hydroquinone monomethyl ether (HQMME) were used as positive controls. TBHQ and HQ were tested at concentrations of 0.1, 1.0 and 5.0%, while HQMME was tested at a concentration of 10.0%. Groups of five males and five females were dosed with TBHQ, HQ, or the vehicle (hydrophilic ointment) daily (M-F) for 13 weeks. In addition, animals (five males, five females) treated with HQMME received 13 doses over a 3-week period. The application site was evaluated weekly for degree of pigmentation loss and irritation. Twenty-four hours after final application, sites were evaluated for depigmentation, irritation and hyperpigmentation. Subsequently, the application site was depilated and re-evaluated for the same endpoints. Repetitive exposure to concentrations of 1.0% and 5.0% TBHQ and HQ were slightly to moderately irritating, while 0.1% of each of these test materials produced only weak irritant responses. No irritant responses to hydrophilic ointment were observed and HQMME produced weak irritant responses after 2 weeks. Neither 0.1% TBHQ nor HQ produced depigmentation, while 20% of animals dosed with 1.0% TBHQ and 30% of animals dosed with 1.0% HQ had spotty or uniform loss of pigment at the site of treatment. Approximately 40% of animals dosed with 5% TBHQ or HQ were depigmented at the treatment site at the final evaluation. HQMME produced complete depigmentation of the skin and hair in all animals. Hyperpigmentation of the treatment site was observed in 80-100% of animals in all groups (with the exception of HQMME-treated animals, treated for only 3 weeks), which may be attributable to the use of hydrophilic ointment as the vehicle, the application procedure, or simply clipping hair from the skin. Thus, this study showed that TBHQ causes depigmentation in black guinea pigs at concentrations of 1% or greater, but that a no-effect threshold for this endpoint exists at a concentration between 0.1 and 1.0%.

  11. An evaluation of the utility of four in situ test methods for transmission line foundation design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mullen, W.G. Jr.

    1991-01-01

    This research examines four existing in-situ soil strength testing methods; standard penetration test (SPT), the cone penetrometer (CPT), the flat plate dilatometer (DMT), and the pressuremeter (PMT). Soils data were collected at eight separate sites using each of the devices. The test sites were chosen to mirror soil conditions encountered within the service territory of Virginia Power, the project sponsor. A total of 19 standard soil borings, 30 cone penetrometer soundings, 26 dilatometer soundings, and 33 pressuremeter tests were undertaken in residual, alluvial and marine clay soil conditions. The testing program was conducted with five areas of concern: (1) comparisonmore » of the penetration/stiffness data from the four tests, (2) comparison of values of undrained shear strength and angle of internal friction developed from each of the test methods, (3) determination if pressuremeter data can be correlated to and thereby developed from one of the more rapid tests, (4) comparison of indirect soil type identifications from the standard borings, (5) development of information on the relative effort required for each test. Comparison of the penetration resistance stiffness data produced useful correlations among the CPT and DMT, with the SPT data yielding more erratic results. Shear strength data was most consistent for the marine clay sites, while the CPT and DMT returned useful friction angle data in the alluvial sands. PMT data correlated well to both the CPT and DMT test results. Correlation of PMT results to the SPT was more erratic. Indirect soil identification from the CPT and DMT was fully adequate for transmission line foundation design purposes, and finally, useful comparative data on the relative testing time required for the four in-situ tests was developed.« less

  12. Analysis and elimination method of the effects of cables on LVRT testing for offshore wind turbines

    NASA Astrophysics Data System (ADS)

    Jiang, Zimin; Liu, Xiaohao; Li, Changgang; Liu, Yutian

    2018-02-01

    The current state, characteristics and necessity of the low voltage ride through (LVRT) on-site testing for grid-connected offshore wind turbines are introduced firstly. Then the effects of submarine cables on the LVRT testing are analysed based on the equivalent circuit of the testing system. A scheme for eliminating the effects of cables on the proposed LVRT testing method is presented. The specified voltage dips are guaranteed to be in compliance with the testing standards by adjusting the ratio between the current limiting impedance and short circuit impedance according to the steady voltage relationship derived from the equivalent circuit. Finally, simulation results demonstrate that the voltage dips at the high voltage side of wind turbine transformer satisfy the requirements of testing standards.

  13. Effluent Management Facility Evaporator Bottom-Waste Streams Formulation and Waste Form Qualification Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    This report describes the results from grout formulation and cementitious waste form qualification testing performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). These results are part of a screening test that investigates three grout formulations proposed for wide-range treatment of different waste stream compositions expected for the Hanford Effluent Management Facility (EMF) evaporator bottom waste. This work supports the technical development need for alternative disposition paths for the EMF evaporator bottom wastes and future direct feed low-activity waste (DFLAW) operations at the Hanford Site. High-priority activities included simulant production, grout formulation, and cementitious wastemore » form qualification testing. The work contained within this report relates to waste form development and testing, and does not directly support the 2017 Integrated Disposal Facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY 2017 and future waste form development efforts. The provided results and data should be used by (1) cementitious waste form scientists to further the understanding of cementitious leach behavior of contaminants of concern (COCs), (2) decision makers interested in off-site waste form disposal, and (3) the U.S. Department of Energy, their Hanford Site contractors and stakeholders as they assess the IDF PA program at the Hanford Site. The results reported help fill existing data gaps, support final selection of a cementitious waste form for the EMF evaporator bottom waste, and improve the technical defensibility of long-term waste form risk estimates.« less

  14. Baseline Ecological Risk Assessment for the Upland at the LCP Chemical Site, Brunswick, Georgia - Site Investigation/Analysis and Risk Characterization (Final)

    EPA Pesticide Factsheets

    Site Investigation/Analysis and Risk Characterization (Final) Prepared for Honeywell International Inc. Prepared by CDR Environmental Specialists, Inc. August 2010 Region ID: 04 DocID: 10746263, DocDate: 08-01-2010

  15. Tidd hot gas clean up program. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Final Report on the Tidd Hot Gas Clean Up Program covers the period from initial Proof-of-Concept testing in August, 1990, through final equipment inspections in May, 1995. The Tidd Hot Gas Clean Up (HGCU) system was installed in the Tidd Pressurized Fluidized Bed Combustion (PFBC) Demonstration Plant, which is the first utility-scale PFBC plant in the United States. Detailed design work on the project began in July, 1990, and site construction began in December, 1991. Initial operation of the system occurred in May, 1992, and the hot gas filter was commissioned in October, 1992. The test program ended inmore » March, 1995, when the Tidd Plant was shut down following its four-year test program. Section 1.0 of this report is an executive summary of the project covering the project background, system description, test results and conclusions. Section 2.0 is an introduction covering the program objectives and schedule. Section 3.0 provides detailed descriptions of the system and its major components. Section 4.0 provides detailed results of all testing including observations and posttest inspection results. Sections 5.0 and 6.0 list the program conclusions and recommendations, respectively. Appendix I is a report prepared by Southern Research Institute on the properties of Tidd PFBC ash sampled during the test program. Appendix II is a report prepared by Westinghouse STC on the performance of candle filter fail-safe regenerator devices.« less

  16. Fuzzy logic controllers for electrotechnical devices - On-site tuning approach

    NASA Astrophysics Data System (ADS)

    Hissel, D.; Maussion, P.; Faucher, J.

    2001-12-01

    Fuzzy logic offers nowadays an interesting alternative to the designers of non linear control laws for electrical or electromechanical systems. However, due to the huge number of tuning parameters, this kind of control is only used in a few industrial applications. This paper proposes a new, very simple, on-site tuning strategy for a PID-like fuzzy logic controller. Thanks to the experimental designs methodology, we will propose sets of optimized pre-established settings for this kind of fuzzy controllers. The proposed parameters are only depending on one on-site open-loop identification test. In this way, this on-site tuning methodology has to be compared to the Ziegler-Nichols one's for conventional controllers. Experimental results (on a permanent magnets synchronous motor and on a DC/DC converter) will underline all the efficiency of this tuning methodology. Finally, the field of validity of the proposed pre-established settings will be given.

  17. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  18. EPA Region 2 SEMS_CERCLIS Sites All [R2] and SEMS_CERCLIS Sites NPL [R2] GIS Layers

    EPA Pesticide Factsheets

    The Region 2 SEMS_CERCLIS Sites All [R2] GIS layer contains unique Superfund Enterprise Management System (SEMS) site records. These records have the following NPL_STATUS designations: CURRENTLY ON FINAL NPL, DELETED FROM FINAL NPL, NOT ON NPL, PROPOSED FOR NPL, REMOVED FROM PROPOSED NPL, and SITE IS PART OF NPL SITE. The Region 2 SEMS_CERCLIS NPL Sites [R2] GIS layer only has SEMS records with the following NPL_STATUS designations: 'CURRENTLY ON FINAL NPL', 'DELETED FROM FINAL NPL', 'PROPOSED FOR NPL'.The Superfund Enterprise Management System (SEMS) is EPA's official record for tracking hazardous waste sites, potentially hazardous waste sites, and remedial activities performed in support of the Superfund Program across the nation. This includes sites that are on the National Priorities List (NPL) or are being considered for the NPL. SEMS represents a joint development and ongoing collaboration between Superfund's Remedial, Removal, Federal Facilities, Enforcement, and Emergency Response programs. It provides its wide audience base with a means of ongoing analysis of Superfund Program activities and informational needs at the site, regional management, and national management levels. The customers of SEMS or SEMS data are five EPA Headquarters offices and regional staff, citizens, the regulated community, other Federal agencies, States, Tribes, local agencies, and industry. SEMS stakeholders are States, Congress, other Federal agencies, industry groups, and cit

  19. A flight-test and simulation evaluation of the longitudinal final approach and landing performance of an automatic system for a light wing loading STOL aircraft

    NASA Technical Reports Server (NTRS)

    Brown, S. C.; Hardy, G. H.; Hindson, W. S.

    1983-01-01

    As part of a comprehensive flight-test program of STOL operating systems for the terminal area, an automatic landing system was developed and evaluated for a light wing loading turboprop aircraft. The aircraft utilized an onboard advanced digital avionics system. Flight tests were conducted at a facility that included a STOL runway site with a microwave landing system. Longitudinal flight-test results were presented and compared with available (basically CTOL) criteria. These comparisons were augmented by results from a comprehensive simulation of the controlled aircraft which included representations of navigation errors that were encountered in flight and atmospheric disturbances. Acceptable performance on final approach and at touchdown was achieved by the autoland (automatic landing) system for the moderate winds and turbulence conditions encountered in flight. However, some touchdown performance goals were marginally achieved, and simulation results suggested that difficulties could be encountered in the presence of more extreme atmospheric conditions. Suggestions were made for improving performance under those more extreme conditions.

  20. Analysis of the Seismic Events Apparently Associated with the 3 September 2017 DPRK Declared Nuclear Explosion

    NASA Astrophysics Data System (ADS)

    Walter, W. R.; Dodge, D. A.; Ichinose, G.; Myers, S. C.; Ford, S. R.; Pitarka, A.; Pyle, M. L.; Pasyanos, M.; Matzel, E.; Rodgers, A. J.; Mellors, R. J.; Hauk, T. F.; Kroll, K.

    2017-12-01

    On September 3, 2017, an mb 6.3 seismic event was reported by the USGS in the vicinity of the DPRK nuclear test site at Punggye-ri. Shortly afterwards DPRK declared it had conducted a nuclear explosion. The seismic signals indicate this event is roughly an order of magnitude larger than the largest of the previous five DPRK declared nuclear tests. In addition to its size, this explosion was different from previous DPRK tests in being associated with a number of additional seismic events. Approximately eight and a half minutes after the explosion a seismic event reported as ML 4.0 by the USGS occurred. Regional waveform modeling indicated this event had a collapse mechanism (e.g. Ichinose et al., 2017, written communication). On September 23 and again on October 12, 2017, seismic events were reported near the DPRK test site by the USGS and the CTBTO (on 9/23/17 two events: USGS ML 3.6 and USGS ML 2.6; and on 10/12/17 one event: USGS mb(Lg) 2.9). Aftershocks following underground nuclear testing are expected, though at much lower magnitudes and rates than for comparably sized earthquakes. This difference in aftershock production has been proposed by Ford and Walter (2010), and others as a potential source-type discriminant. Seismic signals from the collapse of cavities formed by underground nuclear testing have also been previously observed. For example, the mb 5.7 nuclear test ATRISCO in Nevada in 1982 was followed twenty minutes later by a collapse with an mb of 4.0. Here we examine the seismic characteristics of nuclear tests, post-test collapses and post-test aftershocks from both the former Nevada test site and the DPRK test site to better understand the differences between these different source-type signals. In particular we look at discriminants such as P/S ratios, to see if there are unique characteristics to post-test collapses and aftershocks. Finally, we apply correlation methods to continuous data at regional stations to look for additional seismic signals that might have an apparent association with the DPRK nuclear testing, post-testing collapses and post-test induced seismicity.

  1. Direct application of geothermal energy at the L'eggs Product Plant, Las Cruces, New Mexico. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-02-01

    The study program to determine the feasibility of interfacing a potential geothermal resource of Dona Ana County, New Mexico L'eggs Product industrial process is discussed in this final report. Five separate sites were evaluated initially as to geothermal potential and technical feasibility. Preliminary analysis revealed that three sites were considered normal, but that two sites (about three miles from the L'eggs Plant) had very high shallow subsurface temperature gradients (up to 14.85/sup 0/F/100 ft). An initial engineering analysis showed that to meet the L'eggs plant temperature and energy requirements a geothermal fluid temperature of about 250/sup 0/F and 200 gpmmore » flow rate would be necessary. A brief economic comparison indicated that the L'eggs plant site and a geothermal site approximately four miles from the plant did merit further investigation. Detailed engineering and economic design and analysis of these two sites (including the drilling of an 1873 feet deep temperature gradient test hole at the L'eggs Plant) showed that development of the four mile distant site was technically feasible and was the more economic option. It was determined that a single-stage flash system interface design would be most appropriate for the L'eggs Plant. Approximately 39 billion Btu/yr of fossil fuel could be replaced with geothermal energy at the L'eggs facility for a total installed system cost of slightly over $2 million. The projected economic payback period was calculated to be 9.2 years before taxes. This payback was not considered acceptable by L'eggs Products, Inc., to merit additional design or construction work at this time.« less

  2. KSC-2009-2211

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The booster segments for the Ares I-X test rocket were delivered to NASA's Kennedy Space Center in Florida by the Florida East Coast Railroad and the NASA Railroad. Accompanying the train on its route from Jacksonville, Fla., were NASA and ATK officials. Standing here, from left, are ATK Ares I Flight Tests Program Director Joe Oliva, ATK Ares I-X Florida Program Manager Russ Page, NASA Ares Program Manager Steve Cook, ATK Deputy Site Director in Florida Ted Shaffner, NASA KSC Ares I-X Deputy Mission Manager Jon Cowart, ATK Vice President of Space Launch Propulson Cary Ralston, ATK Ares I First Stage program Director Fred Brasfield, ATK Vice President Space Launch Systems Charlie Precourt, ATK Ares I Flight Tests Deputy Program Director Kathy Philpot, NASA Marshall Space Flight Center Reusable Solid Rocket Booster Integration Lead Roy Worthy, ATK Florida Site Director Bob Herman, NASA Res First Stage Project Manager Alex Priskos and NASA KSC Shuttle Launch Director Mike Leinbach. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  3. Designing and Testing of Novel Taxanes to Probe the Highly Complex Mechanisms by Which Taxanes Bind to Microtubules and Cause Cytotoxicity to Cancer Cells

    PubMed Central

    St. George, Marc; Ayoub, Ahmed T.; Banerjee, Asok; Churchill, Cassandra D. M.; Winter, Philip; Klobukowski, Mariusz; Cass, Carol E.; Ludueña, Richard F.; Tuszynski, Jack A.; Damaraju, Sambasivarao

    2015-01-01

    Our previous work identified an intermediate binding site for taxanes in the microtubule nanopore. The goal of this study was to test derivatives of paclitaxel designed to bind to this intermediate site differentially depending on the isotype of β-tubulin. Since β-tubulin isotypes have tissue-dependent expression—specifically, the βIII isotype is very abundant in aggressive tumors and much less common in normal tissues—this is expected to lead to tubulin targeted drugs that are more efficacious and have less side effects. Seven derivatives of paclitaxel were designed and four of these were amenable for synthesis in sufficient purity and yield for further testing in breast cancer model cell lines. None of the derivatives studied were superior to currently used taxanes, however computer simulations provided insights into the activity of the derivatives. Our results suggest that neither binding to the intermediate binding site nor the final binding site is sufficient to explain the activities of the derivative taxanes studied. These findings highlight the need to iteratively improve on the design of taxanes based on their activity in model systems. Knowledge gained on the ability of the engineered drugs to bind to targets and bring about activity in a predictable manner is a step towards personalizing therapies. PMID:26052950

  4. Characterization of Martian Rock Shape for MER Airbag Drop Tests

    NASA Astrophysics Data System (ADS)

    Dimaggio, E. N.; Schroeder, R.; Castle, N.; Golombek, M.

    2002-12-01

    Rock distributions for the final platforms used in airbag drop tests are currently being designed for the Mars Exploration Rovers (MER) scheduled to launch in 2003. Like Mars Pathfinder (MPF), launched in 1996, MER will use a series of airbags to cushion its landing on the surface of Mars. Previous MER airbag drop tests have shown that sharp, angular (triangular) rocks >20 cm high may be hazardous. To aid in defining the rock distributions for the final airbag tests, images from the Viking Landers 1 and 2 and MPF were used to identify rocks that are >20 cm high, and characterize them as triangular, square or round. Approximately 33% of all rocks analyzed are triangular. Of the rocks analyzed that are ~20-60 cm high, ~14% are triangular. Most of these triangular rocks are small, ~20-30 cm high. Rock distributions of previous airbag platforms were similarly classified and show a greater percentage of triangular and square rocks that are ~20-60 cm high than at the landing sites. The burial of a rock (perched, partially buried or buried) was also considered because perched rocks may pose less of a threat to the airbags than those buried because perched rocks can be dislodged and roll during impact. Approximately 19% of all rocks analyzed, and ~19% of rocks that are ~20-60 cm high, are triangular and partially buried or buried. These data suggest that the platform rock distributions appropriately represented the risks to the airbags associated with triangular rocks. A similar percentage of >20 cm high triangular rocks will be added to the drop test platforms to represent landing site rock distributions.

  5. Field Performance of A Compacted Clay Landfill Final cover At A Humid Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albright, William H.; Benson, Craig H.; Gee, Glendon W.

    A study was conducted in southern Georgia, USA to evaluate how the hydraulic properties of the compacted clay barrier layer in a landfill final cover changed over a 4-yr service life. The cover was part of a test section constructed in a large drainage lysimeter that allowed CE Database subject headings: landfill, hydrogeology, compacted soils, lysimeters, desiccation continuous monitoring of the water balance. Patterns in the drainage (i.e., flow from the bottom of the cover) record suggest that preferential flow paths developed in the clay barrier soon after construction, apparently in response to desiccation cracking. After four years, the claymore » barrier was excavated and examined for changes in soil structure and hydraulic conductivity. Tests were conducted in situ with a sealed double-ring infiltrometer and two-stage borehole permeameters and in the laboratory on hand-carved blocks taken during construction and after four years of service. The in situ and laboratory tests indicated that the hydraulic conductivity increased approximately three orders of magnitude (from ? 10-7 to ? 10-4 cm s-1) during the service life. A dye tracer test and soil structure analysis showed that extensive cracking and root development occurred throughout the entire depth of the barrier layer. Laboratory tests on undisturbed specimens of the clay barrier indicated that the hydraulic conductivity of damaged clay barriers can be under-estimated significantly if small specimens (e.g., tube samples) are used for hydraulic conductivity assessment. The findings also indicate that clay barriers must be protected from desiccation and root intrusion if they are expected to function as intended, even at sites in warm, humid locations.« less

  6. Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina. Final report on macroinvertebrate stream assessments for F/H area ETF effluent discharge, July 1987--February 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Specht, W.L.

    1991-10-01

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F?H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presents themore » results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.« less

  7. Predicting DNAPL Source Zone and Plume Response Using Site-Measured Characteristics

    DTIC Science & Technology

    2017-05-19

    FINAL REPORT Predicting DNAPL Source Zone and Plume Response Using Site- Measured Characteristics SERDP Project ER-1613 MAY 2017...Final Report 3. DATES COVERED (From - To) 2007 - 2017 4. TITLE AND SUBTITLE PREDICTING DNAPL SOURCE ZONE AND PLUME RESPONSE USING SITE- MEASURED ...historical record of concentration and head measurements , particularly in the near-source region. For each site considered, currently available data

  8. Assessing the Risk of Inadvertent Nuclear War Between India and Pakistan

    DTIC Science & Technology

    2002-12-01

    stories/review.htm>. 5 avoided partly as a result of this. Hundreds of nuclear weapons tests were conducted, proving the technical capability of...sites in Cuba. The results of such an attack could have been disastrous, putting conventional systems in direct contact with nuclear systems, and... nuclear weapons and their delivery systems. Finally, India and Pakistan’s nuclear doctrines are compared. These comparisons yield important results

  9. FINAL INTERIM REPORT, CANDIDATE SITES, MACHINES IN USE, DATA STORAGE AND TRANSMISSION METHODS: TESTING FEASIBILITY OF 3D ULTRASOUND DATA ACQUISITION AND RELIABILITY OF DATA RETRIEVAL FROM STORED 3D IMAGES

    EPA Science Inventory

    The purpose of this Work Assignment, 02-03, is to examine the feasibility of collecting transmitting, and analyzing 3-D ultrasound data in the context of a multi-center study of pregnant women. The study will also examine the reliability of measurements obtained from 3-D images< ...

  10. The test chemical selection procedure of the European Centre for the Validation of Alternative Methods for the EU Project ReProTect.

    PubMed

    Pazos, Patricia; Pellizzer, Cristian; Stummann, Tina C; Hareng, Lars; Bremer, Susanne

    2010-08-01

    The selection of reference compounds is crucial for a successful in vitro test development in order to proof the relevance of the test system. This publication describes the criteria and the selection strategy leading to a list of more than 130 chemicals suitable for test development within the ReProTect project. The presented chemical inventory aimed to support the development and optimization of in vitro tests that seek to fulfill ECVAM's criteria for entering into the prevalidation. In order to select appropriate substances, a primary database was established compiling information from existing databases. In a second step, predefined selection criteria have been applied to obtain a comprehensive list ready to undergo a peer review process from independent experts with industrial, academic and regulatory background. Finally, a peer reviewed chemical list containing 13 substances challenging endocrine disrupter tests, additional 50 substances serving as reference chemicals for various tests evaluating effects on male and female fertility, and finally 61 substances were identified as known to provoke effects on the early development of mammalian offspring. The final list aims to cover relevant and specific mode/site of actions as they are known to be relevant for various substance classes. However, the recommended list should not be interpreted as a list of reproductive toxicants, because such a description requires proven associations with adverse effects of mammalian reproduction, which are subject of regulatory decisions done by involved competent authorities. Copyright 2010 Elsevier Inc. All rights reserved.

  11. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 6, Supplemental standard for Durango processing site. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    Excavation control to the 15 pCi/g radium-226 (Ra-226) standard at certain areas along the Animas River on the Durango Site would require extensive engineering and construction support. Elevated Ra-226 concentrations have been encountered immediately adjacent to the river at depths in excess of 7 feet below the present river stage. Decontamination to such depths to ensure compliance with the EPA standards will, in our opinion, become unreasonable. This work does not appear to be in keeping with the intent of the standards. Because the principal reason for radium removal is reduction of radon daughter concentrations (RDC) in homes to bemore » built onsite, and because radon produced at depth will be attenuated in clean fill cover before entering such homes, it is appropriate to calculate the depth of excavation needed under a home to reduce RDC to acceptable levels. Potential impact was assessed through radon emanation estimation, using the RAECOM computer model. Elevated Ra-226 concentrations were encountered during final radium excavation of the flood plain below the large tailings pile, adjacent to the slag area. Data from 7 test pits excavated across the area were analyzed to provide an estimate of the Ra-226 concentration profile. Results are given in this report.« less

  12. 78 FR 23837 - Cranes and Derricks in Construction: Underground Construction and Demolition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... report here the results for the entire heavy-and-civil engineering sector and the entire site... in this final rule because employers included in the heavy-and-civil engineering sector, or the site... final rule. This final rule affects two construction sectors: NAICS 237990 (Other Heavy and Civil...

  13. Constraints and Approach for Selecting the Mars Surveyor '01 Landing Site

    NASA Technical Reports Server (NTRS)

    Golombek, M.; Bridges, N.; Gilmore, M.; Haldemann, A.; Parker, T.; Saunders, R.; Spencer, D.; Smith, J.; Weitz, C.

    1999-01-01

    There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough and defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

  14. Constraints, Approach and Present Status for Selecting the Mars Surveyor 2001 Landing Site

    NASA Technical Reports Server (NTRS)

    Golombek, M.; Anderson, F.; Bridges, N.; Briggs, G.; Gilmore, M.; Gulick, V.; Haldemann, A.; Parker, T.; Saunders, R.; Spencer, D.; hide

    1999-01-01

    There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough, defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities.

  15. Fuel conservation evaluation of US Army helicopters. Part 5. Ah-1S flight testing. Final report, 31 July-21 September 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Todd, L.L.; Savage, R.T.; Vincent, R.L.

    1983-01-01

    The United States Army Aviation Engineering Flight Activity conducted level flight performance tests of the AH-1S (Prod) helicopter to provide data to determine the most fuel efficient operating conditions. Hot and cold weather test sites were used to extend the range of the advancing tip Mach number data to supplement existing AH-1S performance data. Preliminary analysis of non-dimensional data identifies the effects of compressibility on performance and shows a power penalty of as much as 6% at a high NR/theta. The power required characteristics determined by these tests can be combined with engine performance to determine the most fuel efficientmore » operating conditions.« less

  16. Comparison of Insertional RNA Editing in Myxomycetes

    PubMed Central

    Chen, Cai; Frankhouser, David; Bundschuh, Ralf

    2012-01-01

    RNA editing describes the process in which individual or short stretches of nucleotides in a messenger or structural RNA are inserted, deleted, or substituted. A high level of RNA editing has been observed in the mitochondrial genome of Physarum polycephalum. The most frequent editing type in Physarum is the insertion of individual Cs. RNA editing is extremely accurate in Physarum; however, little is known about its mechanism. Here, we demonstrate how analyzing two organisms from the Myxomycetes, namely Physarum polycephalum and Didymium iridis, allows us to test hypotheses about the editing mechanism that can not be tested from a single organism alone. First, we show that using the recently determined full transcriptome information of Physarum dramatically improves the accuracy of computational editing site prediction in Didymium. We use this approach to predict genes in the mitochondrial genome of Didymium and identify six new edited genes as well as one new gene that appears unedited. Next we investigate sequence conservation in the vicinity of editing sites between the two organisms in order to identify sites that harbor the information for the location of editing sites based on increased conservation. Our results imply that the information contained within only nine or ten nucleotides on either side of the editing site (a distance previously suggested through experiments) is not enough to locate the editing sites. Finally, we show that the codon position bias in C insertional RNA editing of these two organisms is correlated with the selection pressure on the respective genes thereby directly testing an evolutionary theory on the origin of this codon bias. Beyond revealing interesting properties of insertional RNA editing in Myxomycetes, our work suggests possible approaches to be used when finding sequence motifs for any biological process fails. PMID:22383871

  17. Transferability of species distribution models for the detection of an invasive alien bryophyte using imaging spectroscopy data

    NASA Astrophysics Data System (ADS)

    Skowronek, Sandra; Van De Kerchove, Ruben; Rombouts, Bjorn; Aerts, Raf; Ewald, Michael; Warrie, Jens; Schiefer, Felix; Garzon-Lopez, Carol; Hattab, Tarek; Honnay, Olivier; Lenoir, Jonathan; Rocchini, Duccio; Schmidtlein, Sebastian; Somers, Ben; Feilhauer, Hannes

    2018-06-01

    Remote sensing is a promising tool for detecting invasive alien plant species. Mapping and monitoring those species requires accurate detection. So far, most studies relied on models that are locally calibrated and validated against available field data. Consequently, detecting invasive alien species at new study areas requires the acquisition of additional field data which can be expensive and time-consuming. Model transfer might thus provide a viable alternative. Here, we mapped the distribution of the invasive alien bryophyte Campylopus introflexus to i) assess the feasibility of spatially transferring locally calibrated models for species detection between four different heathland areas in Germany and Belgium and ii) test the potential of combining calibration data from different sites in one species distribution model (SDM). In a first step, four different SDMs were locally calibrated and validated by combining field data and airborne imaging spectroscopy data with a spatial resolution ranging from 1.8 m to 4 m and a spectral resolution of about 10 nm (244 bands). A one-class classifier, Maxent, which is based on the comparison of probability densities, was used to generate all SDMs. In a second step, each model was transferred to the three other study areas and the performance of the models for predicting C. introflexus occurrences was assessed. Finally, models combining calibration data from three study areas were built and tested on the remaining fourth site. In this step, different combinations of Maxent modelling parameters were tested. For the local models, the area under the curve for a test dataset (test AUC) was between 0.57-0.78, while the test AUC for the single transfer models ranged between 0.45-0.89. For the combined models the test AUC was between 0.54-0.9. The success of transferring models calibrated in one site to another site highly depended on the respective study site; the combined models provided higher test AUC values than the locally calibrated models for three out of four study sites. Furthermore, we also demonstrated the importance of optimizing the Maxent modelling parameters. Overall, our results indicate the potential of a combined model to map C. introflexus without the need for new calibration data.

  18. Remote geologic structural analysis of Yucca Flat

    NASA Astrophysics Data System (ADS)

    Foley, M. G.; Heasler, P. G.; Hoover, K. A.; Rynes, N. J.; Thiessen, R. L.; Alfaro, J. L.

    1991-12-01

    The Remote Geologic Analysis (RGA) system was developed by Pacific Northwest Laboratory (PNL) to identify crustal structures that may affect seismic wave propagation from nuclear tests. Using automated methods, the RGA system identifies all valleys in a digital elevation model (DEM), fits three-dimensional vectors to valley bottoms, and catalogs all potential fracture or fault planes defined by coplanar pairs of valley vectors. The system generates a cluster hierarchy of planar features having greater-than-random density that may represent areas of anomalous topography manifesting structural control of erosional drainage development. Because RGA uses computer methods to identify zones of hypothesized control of topography, ground truth using a well-characterized test site was critical in our evaluation of RGA's characterization of inaccessible test sites for seismic verification studies. Therefore, we applied RGA to a study area centered on Yucca Flat at the Nevada Test Site (NTS) and compared our results with both mapped geology and geologic structures and with seismic yield-magnitude models. This is the final report of PNL's RGA development project for peer review within the U.S. Department of Energy Office of Arms Control (OAC) seismic-verification community. In this report, we discuss the Yucca Flat study area, the analytical basis of the RGA system and its application to Yucca Flat, the results of the analysis, and the relation of the analytical results to known topography, geology, and geologic structures.

  19. Assessing soil quality and potential productivity - a basic approach to define and assess the marginality of land

    NASA Astrophysics Data System (ADS)

    Repmann, Frank; Gerwin, Werner; Freese, Dirk

    2017-04-01

    An ever growing demand for energy and the widely proposed switch from fossil fuels to more sustainable energy sources puts the cultivation and use of bioenergy plants into focus. However, bioenergy production on regular and fertile agricultural soils might conflict with the worldwide growing demand for food. To mitigate or omit this potential conflict, the use of low quality or marginal land for cultivation of bioenergy plants becomes favorable. Against this background the definition and assessment of land marginality and, respectively, the evaluation whether and to which extent specific areas are marginal and thus convenient for sustainable bioenergy production, becomes highly relevant. Within the framework of the EU funded Horizon 2020 project SEEMLA, we attempted to asses land marginality of designated test sites in the Ukraine, Greece and Germany by direct field survey. For that purpose, soil and site properties were investigated and evaluated by applying the Muencheberg Soil Quality Rating (SQR) method, developed at the Leibniz Centre for Agricultural Landscape Research (ZALF). The method deploys a comprehensive set of biogeophysical and chemical indicators to describe and finally evaluate the quality of the soil and site by a score ranging from 1 to 100 points. Field survey data were supported by additional laboratory tests on a representative set of soil samples. Practical field work and analysis of field and lab data from the investigated sites proved the applicability of the SQR method within the SEEMLA context. The SQR indices calculated from the field and lab data ranged from 2 to < 40 and clearly demonstrated the marginality of the investigated sites in the Ukraine, Greece and Germany, which differed considerably in respect to their characteristics. Correlating the site quality index to yield data reflecting yield estimations for common bioenergy plants such as willow (Salix sp.), black locust (Robinia pseudoacacia) and poplar (Populus sp.) cultivated at the respective test sites, revealed that SQR might additionally reflect the potential yield of the investigated sites.

  20. A Task-oriented Approach for Hydrogeological Site Characterization

    NASA Astrophysics Data System (ADS)

    Rubin, Y.; Nowak, W.; de Barros, F.

    2010-12-01

    Hydrogeological site characterization is a challenging task from several reasons: (1) the large spatial variability and scarcity of prior information render the outcome of any planned sampling campaign uncertain; (2) there are no simple tools for comparing between the many alternative measurement techniques and data acquisition strategies, and (3) physical and budgetary constraints associated with data acquisition. This paper presents several ideas on how to plan sampling campaigns in a rational manner while addressing these challenges. The first idea is to recognize that different sites and different problems require different characterization strategies. Hence the idea is to plan data acquisition according to its capability for meeting site-specific goals. For example, the characterization needs at a “research problem” site (e.g., a site intended to investigate the transport of uranium in the subsurface such as in Hanford) are different from those of a “problem” site (e.g., contaminated site associated with a health risk to human such as Camp Lejeune, or determining the safe yield of an aquifer). This distinction requires planners to define the characterization goal(s) in a quantitative manner. The second idea is to define metrics that could link specific data types and data acquisition strategies with the site-specific goals in a way that would allow planners to compare between strongly different, alternatives strategies at the design stage (even prior to data acquisition) and to modify the strategies as more data become available. To meet this goal, we developed the concept of the (comparative) information yield curve. Finally, we propose to look at site characterization from the perspective of statistical hypothesis testing, whereby data acquisition strategies could be evaluated in terms of their ability to support or refute various hypotheses made with regard to the characterization goals, and the strategies could be modified once the test is completed. Accept/reject regions for hypothesis testing can be determined based on goals determined by regulations or by agreement between the stakeholders. Hypothesis-driven design could help in minimizing the chances of making wrong decision (false positives or false negatives) with regard to the site-specific goals.

  1. A biomonitoring plan for assessing potential radionuclide exposure using Amchitka Island in the Aleutian chain of Alaska as a case study.

    PubMed

    Burger, Joanna; Gochfeld, Michael; Kosson, D S; Powers, Charles W

    2007-01-01

    With the ending of the Cold War, the US and other nations were faced with a legacy of nuclear wastes. For some sites where hazardous nuclear wastes will remain in place, methods must be developed to protect human health and the environment. Biomonitoring is one method of assessing the status and trends of potential radionuclide exposure from nuclear waste sites, and of providing the public with early warning of any potential harmful exposure. Amchitka Island (51 degrees N lat, 179 degrees E long) was the site of three underground nuclear tests from 1965 to 1971. Following a substantive study of radionuclide levels in biota from the marine environment around Amchitka and a reference site, we developed a suite of bioindicators (with suggested isotopes) that can serve as a model for other sites contaminated with radionuclides. Although the species selection was site-specific, the methods can provide a framework for other sites. We selected bioindicators using five criteria: (1) occurrence at all three test shots (and reference site), (2) receptor groups (subsistence foods, commercial species, and food chain nodes), (3) species groups (plants, invertebrates, fish, and birds), (4) trophic levels, and (5) an accumulator of one or several radionuclides. Our major objective was to identify bioindicators that could serve for both human health and the ecosystem, and were abundant enough to collect adjacent to the three test sites and at the reference site. Site-specific information on both biota availability and isotope levels was essential in the final selection of bioindicators. Actinides bioaccumulated in algae and invertebrates, while radiocesium accumulated in higher trophic level birds and fish. Thus, unlike biomonitoring schemes developed for heavy metals or other contaminants, top-level predators are not sufficient to evaluate potential radionuclide exposure at Amchitka. The process described in this paper resulted in the selection of Fucus, Alaria fistulosa, blue mussel (Mytilus trossulus), dolly varden (Salvelinus malma), black rockfish (Sebastes melanops), Pacific cod (Gadus macrocephalus), Pacific halibut (Hippoglossus stenolepis), and glaucous-winged gull (Larus glaucescens) as bioindicators. This combination of species included mainly subsistence foods, commercial fish, and nodes on different food chains.

  2. Acellular dermal matrix seeded with autologous gingival fibroblasts for the treatment of gingival recession: a proof-of-concept study.

    PubMed

    Jhaveri, Hiral M; Chavan, Mahesh S; Tomar, Geetanjali B; Deshmukh, Vijay L; Wani, Mohan R; Miller, Preston D

    2010-04-01

    One of the most common esthetic concerns associated with periodontal tissues is gingival recession. There are multiple periodontal plastic surgery approaches documented in the literature for the treatment of such defects. With the tremendous advances being made in periodontal science and technology, tissue engineering could be considered among the latest exciting techniques for recession management. In this split-mouth, controlled, double-masked clinical case series, 20 sites from 10 patients with Miller Class I or II recessions affecting canines or premolars in the maxillary arch were selected. One tooth in each patient was randomized to receive either a subepithelial connective tissue graft (SCTG) (control group) or an acellular dermal matrix allograft (ADMA) seeded with autologous gingival fibroblasts (test group) under a coronally positioned flap. Clinical parameters, including recession depth, probing depth, clinical attachment level, width of keratinized tissue, attached gingiva, and plaque scores, were recorded by a calibrated examiner at baseline and 3 and 6 months. The inflammation of grafted sites was scored, and the healing time was calculated. The final esthetic outcome of treated sites was assessed by the root coverage esthetic score at the end of 6 months. There were no significant differences between test and control sites for all measured clinical parameters. However, the test sites demonstrated less inflammation in the early postoperative period. Within the limits of this case series, the results indicate that an ADMA seeded with autologous gingival fibroblasts by tissue-engineering technology may be explored as a substitute to an SCTG for the treatment of Miller Class I and II recession defects.

  3. Medical devices; hematology and pathology devices; classification of early growth response 1 gene fluorescence in-situ hybridization test system for specimen characterization. Final order.

    PubMed

    2014-09-03

    The Food and Drug Administration (FDA) is classifying early growth response 1 (EGR1) gene fluorescence in-situ hybridization (FISH) test system for specimen characterization into class II (special controls). The special controls that will apply to this device are identified in this order and will be part of the codified language for the early growth response 1 (EGR1) gene fluorescence in-site hybridization (FISH) test system for specimen characterization classification. The Agency is classifying the device into class II (special controls) in order to provide a reasonable assurance of safety and effectiveness of the device.

  4. Decision support for the selection of reference sites using 137Cs as a soil erosion tracer

    NASA Astrophysics Data System (ADS)

    Arata, Laura; Meusburger, Katrin; Bürge, Alexandra; Zehringer, Markus; Ketterer, Michael E.; Mabit, Lionel; Alewell, Christine

    2017-08-01

    The classical approach of using 137Cs as a soil erosion tracer is based on the comparison between stable reference sites and sites affected by soil redistribution processes; it enables the derivation of soil erosion and deposition rates. The method is associated with potentially large sources of uncertainty with major parts of this uncertainty being associated with the selection of the reference sites. We propose a decision support tool to Check the Suitability of reference Sites (CheSS). Commonly, the variation among 137Cs inventories of spatial replicate reference samples is taken as the sole criterion to decide on the suitability of a reference inventory. Here we propose an extension of this procedure using a repeated sampling approach, in which the reference sites are resampled after a certain time period. Suitable reference sites are expected to present no significant temporal variation in their decay-corrected 137Cs depth profiles. Possible causes of variation are assessed by a decision tree. More specifically, the decision tree tests for (i) uncertainty connected to small-scale variability in 137Cs due to its heterogeneous initial fallout (such as in areas affected by the Chernobyl fallout), (ii) signs of erosion or deposition processes and (iii) artefacts due to the collection, preparation and measurement of the samples; (iv) finally, if none of the above can be assigned, this variation might be attributed to turbation processes (e.g. bioturbation, cryoturbation and mechanical turbation, such as avalanches or rockfalls). CheSS was exemplarily applied in one Swiss alpine valley where the apparent temporal variability called into question the suitability of the selected reference sites. In general we suggest the application of CheSS as a first step towards a comprehensible approach to test for the suitability of reference sites.

  5. CID Aircraft in practice flight above target impact site with wing cutters

    NASA Technical Reports Server (NTRS)

    1984-01-01

    In this photograph the B-720 is seen making a practice close approach over the prepared impact site. The wing openers, designed to tear open the wings and spill the fuel, are clearly seen on the ground just at the start of the bed of rocks. In a typical aircraft crash, fuel spilled from ruptured fuel tanks forms a fine mist that can be ignited by a number of sources at the crash site. In 1984 the NASA Dryden Flight Research Facility (after 1994 a full-fledged Center again) and the Federal Aviation Administration (FAA) teamed-up in a unique flight experiment called the Controlled Impact Demonstration (CID), to test crash a Boeing 720 aircraft using standard fuel with an additive designed to supress fire. The additive, FM-9, a high-molecular-weight long-chain polymer, when blended with Jet-A fuel had demonstrated the capability to inhibit ignition and flame propagation of the released fuel in simulated crash tests. This anti-misting kerosene (AMK) cannot be introduced directly into a gas turbine engine due to several possible problems such as clogging of filters. The AMK must be restored to almost Jet-A before being introduced into the engine for burning. This restoration is called 'degradation' and was accomplished on the B-720 using a device called a 'degrader.' Each of the four Pratt & Whitney JT3C-7 engines had a 'degrader' built and installed by General Electric (GE) to break down and return the AMK to near Jet-A quality. In addition to the AMK research the NASA Langley Research Center was involved in a structural loads measurement experiment, which included having instrumented dummies filling the seats in the passenger compartment. Before the final flight on December 1, 1984, more than four years of effort passed trying to set-up final impact conditions considered survivable by the FAA. During those years while 14 flights with crews were flown the following major efforts were underway: NASA Dryden developed the remote piloting techniques necessary for the B-720 to fly as a drone aircraft; General Electric installed and tested four degraders (one on each engine); and the FAA refined AMK (blending, testing, and fueling a full-size aircraft). The 15 flights had 15 takeoffs, 14 landings and a larger number of approaches to about 150 feet above the prepared crash site under remote control. These flight were used to introduce AMK one step at a time into some of the fuel tanks and engines while monitoring the performance of the engines. On the final flight (No. 15) with no crew, all fuel tanks were filled with a total of 76,000 pounds of AMK and the remotely-piloted aircraft landed on Rogers Dry Lakebed in an area prepared with posts to test the effectiveness of the AMK in a controlled impact. The CID, which some wags called the Crash in the Desert, was spectacular with a large fireball enveloping and burning the B-720 aircraft. From the standpoint of AMK the test was a major set-back, but for NASA Langley, the data collected on crashworthiness was deemed successful and just as important.

  6. Indentation recovery in GdPO 4 and observation of deformation twinning

    DOE PAGES

    Wilkinson, Taylor M.; Musselman, Matthew A.; Boatner, Lynn A.; ...

    2016-09-30

    A series of nanoindentation tests on both single and polycrystalline specimens of a monazite rare-earth orthophosphate, GdPO 4, revealed frequent observation of anomalous unloading behavior with a large degree of recovery, where previously this behavior had only been observed in xenotime-structure rare-earth orthophosphates. An indentation site in the polycrystalline sample was examined using TEM to identify the deformation mechanism responsible for recovery. Finally, the presence of a twin along the (100) orientation, along with a series of stacking faults contained within the deformation site, provide evidence that the mechanism of recovery in GdPO 4 is the collapse of deformation twinsmore » during unloading.« less

  7. Indentation recovery in GdPO 4 and observation of deformation twinning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilkinson, Taylor M.; Musselman, Matthew A.; Boatner, Lynn A.

    A series of nanoindentation tests on both single and polycrystalline specimens of a monazite rare-earth orthophosphate, GdPO 4, revealed frequent observation of anomalous unloading behavior with a large degree of recovery, where previously this behavior had only been observed in xenotime-structure rare-earth orthophosphates. An indentation site in the polycrystalline sample was examined using TEM to identify the deformation mechanism responsible for recovery. Finally, the presence of a twin along the (100) orientation, along with a series of stacking faults contained within the deformation site, provide evidence that the mechanism of recovery in GdPO 4 is the collapse of deformation twinsmore » during unloading.« less

  8. Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-02-24

    This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

  9. Low-Cost Options for Moderate Levels of Mercury Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sharon Sjostrom

    2006-03-31

    On March 15, 2005, EPA issued the Clean Air Mercury Rule, requiring phased-in reductions of mercury emissions from electric power generators. ADA-ES, Inc., with support from DOE/NETL and industry partners, is conducting evaluations of EPRI's TOXECON II{trademark} process and of high-temperature reagents and sorbents to determine the capabilities of sorbent/reagent injection, including activated carbon, for mercury control on different coals and air emissions control equipment configurations. DOE/NETL targets for total mercury removal are {ge}55% (lignite), {ge}65% (subbituminous), and {ge}80% (bituminous). Based on work done to date at various scales, meeting the removal targets appears feasible. However, work needs to progressmore » to more thoroughly document and test these promising technologies at full scale. This is the final site report for tests conducted at MidAmerican's Louisa Station, one of three sites evaluated in this DOE/NETL program. The other two sites in the program are MidAmerican's Council Bluff Station and Entergy's Independence Station. MidAmerican's Louisa Station burns Powder River Basin (PRB) coal and employs hot-side electrostatic precipitators with flue gas conditioning for particulate control. This part of the testing program evaluated the effect of reagents used in the existing flue gas conditioning on mercury removal.« less

  10. Pre-Launch Tasks Proposed in our Contract of December 1991

    NASA Technical Reports Server (NTRS)

    1998-01-01

    We propose, during the pre-EOS phase to: (1) develop, with other MODIS Team Members, a means of discriminating different major biome types with NDVI and other AVHRR-based data; (2) develop a simple ecosystem process model for each of these biomes, BIOME-BGC; (3) relate the seasonal trend of weekly composite NDVI to vegetation phenology and temperature limits to develop a satellite defined growing season for vegetation; and (4) define physiologically based energy to mass conversion factors for carbon and water for each biome. Our final core at-launch product will be simplified, completely satellite driven biome specific models for net primary production. We will build these biome specific satellite driven algorithms using a family of simple ecosystem process models as calibration models, collectively called BIOME-BGC, and establish coordination with an existing network of ecological study sites in order to test and validate these products. Field datasets will then be available for both BIOME-BGC development and testing, use for algorithm developments of other MODIS Team Members, and ultimately be our first test point for MODIS land vegetation products upon launch. We will use field sites from the National Science Foundation Long-Term Ecological Research network, and develop Glacier National Park as a major site for intensive validation.

  11. Pre-Launch Tasks Proposed in our Contract of December 1991

    NASA Technical Reports Server (NTRS)

    Running, Steven W.; Nemani, Ramakrishna R.; Glassy, Joseph

    1997-01-01

    We propose, during the pre-EOS phase to: (1) develop, with other MODIS Team Members, a means of discriminating different major biome types with NDVI and other AVHRR-based data. (2) develop a simple ecosystem process model for each of these biomes, BIOME-BGC (3) relate the seasonal trend of weekly composite NDVI to vegetation phenology and temperature limits to develop a satellite defined growing season for vegetation; and (4) define physiologically based energy to mass conversion factors for carbon and water for each biome. Our final core at-launch product will be simplified, completely satellite driven biome specific models for net primary production. We will build these biome specific satellite driven algorithms using a family of simple ecosystem process models as calibration models, collectively called BIOME-BGC, and establish coordination with an existing network of ecological study sites in order to test and validate these products. Field datasets will then be available for both BIOME-BGC development and testing, use for algorithm developments of other MODIS Team Members, and ultimately be our first test point for MODIS land vegetation products upon launch. We will use field sites from the National Science Foundation Long-Term Ecological Research network, and develop Glacier National Park as a major site for intensive validation.

  12. DESIGNING AN OPPORTUNITY FUEL WITH BIOMASS AND TIRE-DERIVED FUEL FOR COFIRING AT WILLOW ISLAND GENERATING STATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period January 1, 2001-March 31, 2001, Allegheny Energy Supply Co., LLC (Allegheny) finalized the engineering of the Willow Island cofiring project, completed the fuel characterizations for both the Willow Island and Albright Generating Station projects, and initiated construction of both projects. Allegheny and its contractor, Foster Wheeler, selected appropriate fuel blends and issued purchase orders for all processing and mechanical equipment to be installed at both sites. This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. The third quarter of the project involved completing the detailedmore » designs for the Willow Island Designer Fuel project. It also included complete characterization of the coal and biomass fuels being burned, focusing upon the following characteristics: proximate and ultimate analysis; higher heating value; carbon 13 nuclear magnetic resonance testing for aromaticity, number of aromatic carbons per cluster, and the structural characteristics of oxygen in the fuel; drop tube reactor testing for high temperature devolatilization kinetics and generation of fuel chars; thermogravimetric analyses (TGA) for char oxidation kinetics; and related testing. The construction at both sites commenced during this quarter, and was largely completed at the Albright Generating Station site.« less

  13. Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeremy Gwin and Douglas Frenette

    This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values andmore » corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.« less

  14. Development Studies for a Novel Wet Oxidation Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delphi Research

    1999-09-30

    DETOX is a catalyzed wet oxidation process that destroys organic materials in an acidic water solution of iron at 373 to 473 K. The solution can be used repeatedly to destroy great amounts of organic materials. Since the process is conducted in a contained vessel, air emissions from the process can be well controlled. The solution is also capable of dissolving and concentrating many heavy and radioactive metals for eventual stabilization and disposal. The Phase III effort for this project is fabrication, assembly, and installation of the DETOX demonstration unit, preparation of documentation and training to meet site requirements formore » operation, followed by system run-in and shakedown testing of the unit prior to demonstration testing. The Title III design was completed and the unit was fabricated according to standards set forth by OSHA, EPA, the American Petroleum Institute (i.e., chemical and petroleum industry standards), and the ASME B-313 Piping Code requirements as agreed to in preliminary design meetings with primary stakeholders. The unit was assembled in three modules and two trailers and then shipped to the TNX facility at the Savannah River Site in September and october of 1996. On-going site integration tasks were address while delays in installation arose due to funding sources and costs. In March of 1997, Delphi was authorized to proceed with the installation of the unit, making electrical and mechanical connections necessary to operate the unit. All installation tasks were completed in August of 1997. Results of an Operational Readiness Review conducted in August 1997 verified that Delphi's procedures and documentation met the necessary requirements to operate the unit at SRS. Completion of the final checklist of WSRC requirements was then addressed including the Owner's Independent Inspection Report, verifying all components of the unit met B-31.3 standards. Final hydraulic and pneumatic tests were completed in November to satisfy the B-31.3 requirement. During the month of December, the control system and heating and cooling systems were then prepared to initiate system startup and conduct the run-in tests. Shakedown tests were combined with the Phase IV tasks due to DOE funding constraints, i.e., tests formerly planned to be conducted with oil and solid materials were deferred to Phase IV and combined with similar testing. Once run-in testing has been completed, the primary objectives of Phase III will have been achieved and the project will be ready to proceed to demonstration testing (Phase IV).« less

  15. Does the choice of nucleotide substitution models matter topologically?

    PubMed

    Hoff, Michael; Orf, Stefan; Riehm, Benedikt; Darriba, Diego; Stamatakis, Alexandros

    2016-03-24

    In the context of a master level programming practical at the computer science department of the Karlsruhe Institute of Technology, we developed and make available an open-source code for testing all 203 possible nucleotide substitution models in the Maximum Likelihood (ML) setting under the common Akaike, corrected Akaike, and Bayesian information criteria. We address the question if model selection matters topologically, that is, if conducting ML inferences under the optimal, instead of a standard General Time Reversible model, yields different tree topologies. We also assess, to which degree models selected and trees inferred under the three standard criteria (AIC, AICc, BIC) differ. Finally, we assess if the definition of the sample size (#sites versus #sites × #taxa) yields different models and, as a consequence, different tree topologies. We find that, all three factors (by order of impact: nucleotide model selection, information criterion used, sample size definition) can yield topologically substantially different final tree topologies (topological difference exceeding 10 %) for approximately 5 % of the tree inferences conducted on the 39 empirical datasets used in our study. We find that, using the best-fit nucleotide substitution model may change the final ML tree topology compared to an inference under a default GTR model. The effect is less pronounced when comparing distinct information criteria. Nonetheless, in some cases we did obtain substantial topological differences.

  16. Measurement of the setting expansion of phosphate-bonded investment materials: Part I - Development of the Casting-Ring Test.

    PubMed

    Lloyd, C H; Yearn, J A; Cowper, G A; Blavier, J; Vanderdonckt, M

    2004-07-01

    The setting expansion is an important property for a phosphate-bonded investment material. This research was undertaken to investigate a test that might be suitable for its measurement when used in a Standard. In the 'Casting-Ring Test', the investment sample is contained in a steel ring and expands to displace a precisely positioned pin. Variables with the potential to alter routine reproduction of the value were investigated. The vacuum-mixer model is a production laboratory variable that must not be ignored and for this reason, experiments were repeated using a different vacuum-mixer located at a second test site. Restraint by the rigid ring material increased expansion, while force on the pin reduced it. Expansion was specific to the lining selected. Increased environmental temperature decreased the final value. Expansion was still taking place at a time at which its value might be measured. However, when these factors are set, the reproducibility of values for setting expansion was good at both test sites (coefficient of variation 14%, at most). The results revealed that with the control that is available reliable routine measurement is possible in a Standard test. The inter-laboratory variable, vacuum-mixer model, produced significant differences and it should be the subject of further investigation.

  17. Experimental Results of Site Calibration and Sensitivity Measurements in OTR for UWB Systems

    NASA Astrophysics Data System (ADS)

    Viswanadham, Chandana; Rao, P. Mallikrajuna

    2017-06-01

    System calibration and parameter accuracy measurement of electronic support measures (ESM) systems is a major activity, carried out by electronic warfare (EW) engineers. These activities are very critical and needs good understanding in the field of microwaves, antennas, wave propagation, digital and communication domains. EW systems are broad band, built with state-of-the art electronic hardware, installed on different varieties of military platforms to guard country's security from time to time. EW systems operate in wide frequency ranges, typically in the order of thousands of MHz, hence these are ultra wide band (UWB) systems. Few calibration activities are carried within the system and in the test sites, to meet the accuracies of final specifications. After calibration, parameters are measured for their accuracies either in feed mode by injecting the RF signals into the front end or in radiation mode by transmitting the RF signals on to system antenna. To carry out these activities in radiation mode, a calibrated open test range (OTR) is necessary in the frequency band of interest. Thus site calibration of OTR is necessary to be carried out before taking up system calibration and parameter measurements. This paper presents the experimental results of OTR site calibration and sensitivity measurements of UWB systems in radiation mode.

  18. 45 CFR 154.230 - Submission and posting of Final Justifications for unreasonable rate increases.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information available to the public on its Web site for at least three years. (d) CMS will post all Final Justifications on the CMS Web site. This information will remain available to the public on the CMS Web site for... submitted in the Preliminary Justification supporting the rate increase; and (2) Prominently post on its Web...

  19. 10 CFR 52.83 - Finality of referenced NRC approvals; partial initial decision on site suitability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....145, and 52.171. (b) While a partial decision on site suitability is in effect under 10 CFR 2.617(b)(2... decision on site suitability. 52.83 Section 52.83 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.83 Finality of referenced NRC...

  20. 10 CFR 52.83 - Finality of referenced NRC approvals; partial initial decision on site suitability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....145, and 52.171. (b) While a partial decision on site suitability is in effect under 10 CFR 2.617(b)(2... decision on site suitability. 52.83 Section 52.83 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.83 Finality of referenced NRC...

  1. Site suitability evaluation of an old operating landfill using AHP and GIS techniques and integrated hydrogeological and geophysical surveys.

    PubMed

    Saatsaz, Masoud; Monsef, Iman; Rahmani, Mostafa; Ghods, Abdolreza

    2018-02-16

    Because of the outdated methods of common landfill selection, it is imperative to reevaluate the usage suitability. To assess the suitability of the existing waste landfill in Zanjan, Iran, we have used a combination of the analytical hierarchy process (AHP) and GIS techniques, along with fieldwork surveys. Four major criteria and 12 subcriteria were considered, and the AHP was applied to assign the relative importance weights of criteria and subcriteria to each other. Finally, a landfill suitability map was generated and ranked based on the final suitability scores. The results show that the unsuitable areas are around Zanjan, in the middle parts of the plain. By contrast, the most suitable areas are uncultivated areas, located mostly in the west, north, and south. The results also indicate that the present landfill is a highly suitable site. After desk studies, geoelectrical surveys and infiltration measurements were conducted to make the final decision. Double-ring permeability tests confirm the landfill is an acceptable site. The electrical sounding shows that the leachate plume has a width of about ~ 450 m, spreads to a depth of about ~ 55 m, and migrates towards the northeast. Considering the groundwater depth, dry climate, and a low infiltration rate of the landfill soils, it can be concluded that leachate plumes will not contaminate groundwater within this decade. The proposed method can be implemented to reevaluate the suitability of any old operating reservoir such as oil reservoirs, petrol filling stations, heavy industrial tanks, and landfills, containing liquid hazardous materials.

  2. SVM-Based Prediction of Propeptide Cleavage Sites in Spider Toxins Identifies Toxin Innovation in an Australian Tarantula

    PubMed Central

    Wong, Emily S. W.; Hardy, Margaret C.; Wood, David; Bailey, Timothy; King, Glenn F.

    2013-01-01

    Spider neurotoxins are commonly used as pharmacological tools and are a popular source of novel compounds with therapeutic and agrochemical potential. Since venom peptides are inherently toxic, the host spider must employ strategies to avoid adverse effects prior to venom use. It is partly for this reason that most spider toxins encode a protective proregion that upon enzymatic cleavage is excised from the mature peptide. In order to identify the mature toxin sequence directly from toxin transcripts, without resorting to protein sequencing, the propeptide cleavage site in the toxin precursor must be predicted bioinformatically. We evaluated different machine learning strategies (support vector machines, hidden Markov model and decision tree) and developed an algorithm (SpiderP) for prediction of propeptide cleavage sites in spider toxins. Our strategy uses a support vector machine (SVM) framework that combines both local and global sequence information. Our method is superior or comparable to current tools for prediction of propeptide sequences in spider toxins. Evaluation of the SVM method on an independent test set of known toxin sequences yielded 96% sensitivity and 100% specificity. Furthermore, we sequenced five novel peptides (not used to train the final predictor) from the venom of the Australian tarantula Selenotypus plumipes to test the accuracy of the predictor and found 80% sensitivity and 99.6% 8-mer specificity. Finally, we used the predictor together with homology information to predict and characterize seven groups of novel toxins from the deeply sequenced venom gland transcriptome of S. plumipes, which revealed structural complexity and innovations in the evolution of the toxins. The precursor prediction tool (SpiderP) is freely available on ArachnoServer (http://www.arachnoserver.org/spiderP.html), a web portal to a comprehensive relational database of spider toxins. All training data, test data, and scripts used are available from the SpiderP website. PMID:23894279

  3. Superfund record of decision (EPA Region 5): Feed Materials Production Center, (USDOE), Operable Unit 4, Fernald, Hamilton County, OH, December 7, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. The materials within Operable Unit 4 exhibit a wide range of properties. Most notable would be the elevated direct radiation associated with the K-65 residues versus the much lower direct radiation associated with cold metal oxides in Silo 3. Even more significant would be the much lower levels of contamination associated with the soils and building materials, like concrete, within the Operable Unit 4 Study Area. On the basis of the evaluation of final alternatives, the selected remedy addressing Operable Unitmore » 4 at the FEMP is a combination of Alternatives 3A.1/Vit - Removal, Vitrification, and Off-site Disposal - Nevada Test Site (NTS); 3B.1/Vit - Removal, Vitrification, and Off-site Disposal - NTS; and 2C - Demolition, Removal and On-Property Disposal.« less

  4. [Direct-to-consumer genetic testing through Internet: marketing, ethical and social issues].

    PubMed

    Ducournau, Pascal; Gourraud, Pierre-Antoine; Rial-Sebbag, Emmanuelle; Bulle, Alexandre; Cambon-Thomsen, Anne

    2011-01-01

    We probably did not anticipate all the consequences of the direct to consumer genetic tests on Internet, resulting from the combined skills of communication and genomic advances. What are the commercial strategies used by the companies offering direct-to-consumer genetic tests on Internet and what are the different social expectations on which they focus? Through a quantitative and qualitative analysis of the web sites offering such tests, it seems that these companies target a triple market based on: the "healthism" which raises health and hygiene to the top of the social values; the contemporary demands of the users to become actual actors of health decisions; and finally on the need for bio-social relationships. These three commercial strategies underlie various ethical and societal issues justifying a general analysis.

  5. Quality and Health Literacy Demand of Online Heart Failure Information.

    PubMed

    Cajita, Maan Isabella; Rodney, Tamar; Xu, Jingzhi; Hladek, Melissa; Han, Hae-Ra

    The ubiquity of the Internet is changing the way people obtain their health information. Although there is an abundance of heart failure information online, the quality and health literacy demand of these information are still unknown. The purpose of this study is to evaluate the quality and health literacy demand (readability, understandability, and actionability) of the heart failure information found online. Google, Yahoo, Bing, Ask.com, and DuckDuckGo were searched for relevant heart failure Web sites. Two independent raters then assessed the quality and health literacy demand of the included Web sites. The quality of the heart failure information was assessed using the DISCERN instrument. Readability was assessed using 7 established readability tests. Finally, understandability and actionability were assessed using the Patient Education Materials Assessment Tool for Print Materials. A total of 46 Web sites were included in this analysis. The overall mean quality rating was 46.0 ± 8.9 and the mean readability score was 12.6 grade reading level. The overall mean understandability score was 56.3% ± 16.2%. Finally, the overall mean actionability score was 34.7% ± 28.7%. The heart failure information found online was of fair quality but required a relatively high health literacy level. Web content authors need to consider not just the quality but also the health literacy demand of the information found in their Web sites. This is especially important considering that low health literacy is likely prevalent among the usual audience.

  6. Predicting protein amidation sites by orchestrating amino acid sequence features

    NASA Astrophysics Data System (ADS)

    Zhao, Shuqiu; Yu, Hua; Gong, Xiujun

    2017-08-01

    Amidation is the fourth major category of post-translational modifications, which plays an important role in physiological and pathological processes. Identifying amidation sites can help us understanding the amidation and recognizing the original reason of many kinds of diseases. But the traditional experimental methods for predicting amidation sites are often time-consuming and expensive. In this study, we propose a computational method for predicting amidation sites by orchestrating amino acid sequence features. Three kinds of feature extraction methods are used to build a feature vector enabling to capture not only the physicochemical properties but also position related information of the amino acids. An extremely randomized trees algorithm is applied to choose the optimal features to remove redundancy and dependence among components of the feature vector by a supervised fashion. Finally the support vector machine classifier is used to label the amidation sites. When tested on an independent data set, it shows that the proposed method performs better than all the previous ones with the prediction accuracy of 0.962 at the Matthew's correlation coefficient of 0.89 and area under curve of 0.964.

  7. Field Calibration of Wind Direction Sensor to the True North and Its Application to the Daegwanryung Wind Turbine Test Sites

    PubMed Central

    Lee, Jeong Wan

    2008-01-01

    This paper proposes a field calibration technique for aligning a wind direction sensor to the true north. The proposed technique uses the synchronized measurements of captured images by a camera, and the output voltage of a wind direction sensor. The true wind direction was evaluated through image processing techniques using the captured picture of the sensor with the least square sense. Then, the evaluated true value was compared with the measured output voltage of the sensor. This technique solves the discordance problem of the wind direction sensor in the process of installing meteorological mast. For this proposed technique, some uncertainty analyses are presented and the calibration accuracy is discussed. Finally, the proposed technique was applied to the real meteorological mast at the Daegwanryung test site, and the statistical analysis of the experimental testing estimated the values of stable misalignment and uncertainty level. In a strict sense, it is confirmed that the error range of the misalignment from the exact north could be expected to decrease within the credibility level. PMID:27873957

  8. Natural Pressure-Driven Passive Bioventing

    DTIC Science & Technology

    2000-09-01

    8217 300’ PFFA SCALE : 1 "= 300’ LEGEND 0 ABOVE GROUND STORAGE TANK I BUILDING FENCE = = = : DRAINAGE CHANNEL \\731272\\REPORT\\FINAL\\GRA PHICS...preparation for full- scale design of a conventional bioventing system at the PFFA, a bioventing pilot test was conducted in the demonstration area prior...PFFAVW02 @ @ PFFABOS02 PFFAVMP14..6. @ PFFABOS04 • PFFABOS06 CPT-BOSSA @ PFFABOS08 ~ JM11 ~? r 1,o v SCALE IN FEET FIGURE 6 SITE PLAN PFFA

  9. PILOT-SCALE TEST RESULTS OF A THIN FILM EVAPORATOR SYSTEM FOR MANAGEMENT OF LIQUID HIGH-LEVEL WASTES AT THE HANFORD SITE WASHINGTON USA -11364

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CORBETT JE; TEDESCH AR; WILSON RA

    2011-02-14

    A modular, transportable evaporator system, using thin film evaporative technology, is planned for deployment at the Hanford radioactive waste storage tank complex. This technology, herein referred to as a wiped film evaporator (WFE), will be located at grade level above an underground storage tank to receive pumped liquids, concentrate the liquid stream from 1.1 specific gravity to approximately 1.4 and then return the concentrated solution back into the tank. Water is removed by evaporation at an internal heated drum surface exposed to high vacuum. The condensed water stream will be shipped to the site effluent treatment facility for final disposal.more » This operation provides significant risk mitigation to failure of the aging 242-A Evaporator facility; the only operating evaporative system at Hanford maximizing waste storage. This technology is being implemented through a development and deployment project by the tank farm operating contractor, Washington River Protection Solutions (WRPS), for the Office of River Protection/Department of Energy (ORPIDOE), through Columbia Energy and Environmental Services, Inc. (Columbia Energy). The project will finalize technology maturity and install a system at one of the double-shell tank farms. This paper summarizes results of a pilot-scale test program conducted during calendar year 2010 as part of the ongoing technology maturation development scope for the WFE.« less

  10. Developing a lower-cost atmospheric CO2 monitoring system using commercial NDIR sensor

    NASA Astrophysics Data System (ADS)

    Arzoumanian, E.; Bastos, A.; Gaynullin, B.; Laurent, O.; Vogel, F. R.

    2017-12-01

    Cities release to the atmosphere about 44 % of global energy-related CO2. It is clear that accurate estimates of the magnitude of anthropogenic and natural urban emissions are needed to assess their influence on the carbon balance. A dense ground-based CO2 monitoring network in cities would potentially allow retrieving sector specific CO2 emission estimates when combined with an atmospheric inversion framework using reasonably accurate observations (ca. 1 ppm for hourly means). One major barrier for denser observation networks can be the high cost of high precision instruments or high calibration cost of cheaper and unstable instruments. We have developed and tested a novel inexpensive NDIR sensors for CO2 measurements which fulfils cost and typical parameters requirements (i.e. signal stability, efficient handling, and connectivity) necessary for this task. Such sensors are essential in the market of emissions estimates in cities from continuous monitoring networks as well as for leak detection of MRV (monitoring, reporting, and verification) services for industrial sites. We conducted extensive laboratory tests (short and long-term repeatability, cross-sensitivities, etc.) on a series of prototypes and the final versions were also tested in a climatic chamber. On four final HPP prototypes the sensitivity to pressure and temperature were precisely quantified and correction&calibration strategies developed. Furthermore, we fully integrated these HPP sensors in a Raspberry PI platform containing the CO2 sensor and additional sensors (pressure, temperature and humidity sensors), gas supply pump and a fully automated data acquisition unit. This platform was deployed in parallel to Picarro G2401 instruments in the peri-urban site Saclay - next to Paris, and in the urban site Jussieu - Paris, France. These measurements were conducted over several months in order to characterize the long-term drift of our HPP instruments and the ability of the correction and calibration scheme to provide bias free observations. From the lessons learned in the laboratory tests and field measurements, we developed a specific correction and calibration strategy for our NDIR sensors. Latest results and calibration strategies will be shown.

  11. Harmonization of multi-site diffusion tensor imaging data.

    PubMed

    Fortin, Jean-Philippe; Parker, Drew; Tunç, Birkan; Watanabe, Takanori; Elliott, Mark A; Ruparel, Kosha; Roalf, David R; Satterthwaite, Theodore D; Gur, Ruben C; Gur, Raquel E; Schultz, Robert T; Verma, Ragini; Shinohara, Russell T

    2017-11-01

    Diffusion tensor imaging (DTI) is a well-established magnetic resonance imaging (MRI) technique used for studying microstructural changes in the white matter. As with many other imaging modalities, DTI images suffer from technical between-scanner variation that hinders comparisons of images across imaging sites, scanners and over time. Using fractional anisotropy (FA) and mean diffusivity (MD) maps of 205 healthy participants acquired on two different scanners, we show that the DTI measurements are highly site-specific, highlighting the need of correcting for site effects before performing downstream statistical analyses. We first show evidence that combining DTI data from multiple sites, without harmonization, may be counter-productive and negatively impacts the inference. Then, we propose and compare several harmonization approaches for DTI data, and show that ComBat, a popular batch-effect correction tool used in genomics, performs best at modeling and removing the unwanted inter-site variability in FA and MD maps. Using age as a biological phenotype of interest, we show that ComBat both preserves biological variability and removes the unwanted variation introduced by site. Finally, we assess the different harmonization methods in the presence of different levels of confounding between site and age, in addition to test robustness to small sample size studies. Copyright © 2017 Elsevier Inc. All rights reserved.

  12. Validation of EO-1 Hyperion and Advanced Land Imager Using the Radiometric Calibration Test Site at Railroad Valley, Nevada

    NASA Technical Reports Server (NTRS)

    Czapla-Myers, Jeffrey; Ong, Lawrence; Thome, Kurtis; McCorkel, Joel

    2015-01-01

    The Earth-Observing One (EO-1) satellite was launched in 2000. Radiometric calibration of Hyperion and the Advanced Land Imager (ALI) has been performed throughout the mission lifetime using various techniques that include ground-based vicarious calibration, pseudo-invariant calibration sites, and also the moon. The EO-1 mission is nearing its useful lifetime, and this work seeks to validate the radiometric calibration of Hyperion and ALI from 2013 until the satellite is decommissioned. Hyperion and ALI have been routinely collecting data at the automated Radiometric Calibration Test Site [RadCaTS/Railroad Valley (RRV)] since launch. In support of this study, the frequency of the acquisitions at RadCaTS has been significantly increased since 2013, which provides an opportunity to analyze the radiometric stability and accuracy during the final stages of the EO-1 mission. The analysis of Hyperion and ALI is performed using a suite of ground instrumentation that measures the atmosphere and surface throughout the day. The final product is an estimate of the top-of-atmosphere (TOA) spectral radiance, which is compared to Hyperion and ALI radiances. The results show that Hyperion agrees with the RadCaTS predictions to within 5% in the visible and near-infrared (VNIR) and to within 10% in the shortwave infrared (SWIR). The 2013-2014 ALI results show agreement to within 6% in the VNIR and 7.5% in the SWIR bands. A cross comparison between ALI and the Operational Land Imager (OLI) using RadCaTS as a transfer source shows agreement of 3%-6% during the period of 2013-2014.

  13. Ensemble predictive model for more accurate soil organic carbon spectroscopic estimation

    NASA Astrophysics Data System (ADS)

    Vašát, Radim; Kodešová, Radka; Borůvka, Luboš

    2017-07-01

    A myriad of signal pre-processing strategies and multivariate calibration techniques has been explored in attempt to improve the spectroscopic prediction of soil organic carbon (SOC) over the last few decades. Therefore, to come up with a novel, more powerful, and accurate predictive approach to beat the rank becomes a challenging task. However, there may be a way, so that combine several individual predictions into a single final one (according to ensemble learning theory). As this approach performs best when combining in nature different predictive algorithms that are calibrated with structurally different predictor variables, we tested predictors of two different kinds: 1) reflectance values (or transforms) at each wavelength and 2) absorption feature parameters. Consequently we applied four different calibration techniques, two per each type of predictors: a) partial least squares regression and support vector machines for type 1, and b) multiple linear regression and random forest for type 2. The weights to be assigned to individual predictions within the ensemble model (constructed as a weighted average) were determined by an automated procedure that ensured the best solution among all possible was selected. The approach was tested at soil samples taken from surface horizon of four sites differing in the prevailing soil units. By employing the ensemble predictive model the prediction accuracy of SOC improved at all four sites. The coefficient of determination in cross-validation (R2cv) increased from 0.849, 0.611, 0.811 and 0.644 (the best individual predictions) to 0.864, 0.650, 0.824 and 0.698 for Site 1, 2, 3 and 4, respectively. Generally, the ensemble model affected the final prediction so that the maximal deviations of predicted vs. observed values of the individual predictions were reduced, and thus the correlation cloud became thinner as desired.

  14. Technology support in nursing education: clickers in the classroom.

    PubMed

    Berry, Janice

    2009-01-01

    Research has shown that the present generation of students has a preference for digital literacy, experiential learning, interactivity, and immediacy; therefore, greater use of technology is being brought into university courses to aid in student involvement. Student Response Systems, called clickers, were incorporated as a teaching methodology to enhance student interaction and learning in a didactic pediatric nursing course. This course was taught over Interactive Television (ITV) with students at a distant site as well as face to face, creating the challenge of whole-class engagement. Clickers were used to actively engage students at both sites simultaneously and give immediate feedback to students regarding understanding of lecture material. Clickers also allowed small-group problem solving of questions. Exam grades and level of participation in case studies were monitored and exam scores and final scores were compared to those of a previous class. Student t-tests demonstrated that one of three course exams and final course grades were significantly higher for the students who used clickers in the classroom. Satisfaction feedback also supported the use of clickers as a tool to engage students and enhance learning outcomes.

  15. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  16. Partial Updating of TSCA Inventory DataBase; Production and Site Reports; Final Rule

    EPA Pesticide Factsheets

    A partial updating of the TSCA inventory database. The final rule requires manufacturers and importers of certain chemical substances included on the TSCA Chemical Substances Inventory to report current data on the production volume, plant site, etc.

  17. Subscale Validation of the Subsurface Active Filtration of Exhaust (SAFE) Approach to the NTP Ground Testing

    NASA Technical Reports Server (NTRS)

    Marshall, William M.; Borowski, Stanley K.; Bulman, Mel; Joyner, Russell; Martin, Charles R.

    2015-01-01

    Nuclear thermal propulsion (NTP) has been recognized as an enabling technology for missions to Mars and beyond. However, one of the key challenges of developing a nuclear thermal rocket is conducting verification and development tests on the ground. A number of ground test options are presented, with the Sub-surface Active Filtration of Exhaust (SAFE) method identified as a preferred path forward for the NTP program. The SAFE concept utilizes the natural soil characteristics present at the Nevada National Security Site to provide a natural filter for nuclear rocket exhaust during ground testing. A validation method of the SAFE concept is presented, utilizing a non-nuclear sub-scale hydrogen/oxygen rocket seeded with detectible radioisotopes. Additionally, some alternative ground test concepts, based upon the SAFE concept, are presented. Finally, an overview of the ongoing discussions of developing a ground test campaign are presented.

  18. Evaporative oxidation treatability test report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    In 1992, Congress passed the Federal Facilities Compliance Act that requires the U.S. Department of Energy (DOE) to treat and dispose of its mixed waste in accordance with the Resource Conservation and Recovery Act (RCRA) land disposal restrictions (LDRs). In response to the need for mixed-waste treatment capacity where available off-site commercial treatment facilities do not exist or cannot be used, the DOE Albuquerque Operations Office (DOE-AL) organized a Treatment Selection Team to match mixed wastes with treatment options and develop a strategy for treatment of its mixed wastes. DOE-AL manages operations at nine sites with mixed-waste inventories. The Treatmentmore » Selection Team determined a need to develop mobile treatment capacity to treat wastes at the sites where the wastes are generated. Treatment processes used for mixed waste not only must address the hazardous component (i.e., meet LDRs) but also must contain the radioactive component in a form that allows final disposal while protecting workers, the public, and the environment. On the basis of recommendations of the Treatment Selection Team, DOE-AL assigned projects to the sites to bring mixed-waste treatment capacity on-line. The three technologies assigned to the DOE Grand Junction Projects Office (GJPO) are evaporative oxidation, thermal desorption, and treated wastewater evaporation. Rust Geotech, the DOE-GJPO prime contractor, was assigned to design and fabricate mobile treatment units (MTUs) for these three technologies and to deliver the MTUs to selected DOE-AL sites. To conduct treatability tests at the GJPO, Rust leased a pilot-scale evaporative oxidation unit from the Clemson Technical Center (CTC), Anderson, South Carolina. The purpose of this report is to document the findings and results of tests performed using this equipment.« less

  19. Deterministic approach for multiple-source tsunami hazard assessment for Sines, Portugal

    NASA Astrophysics Data System (ADS)

    Wronna, M.; Omira, R.; Baptista, M. A.

    2015-11-01

    In this paper, we present a deterministic approach to tsunami hazard assessment for the city and harbour of Sines, Portugal, one of the test sites of project ASTARTE (Assessment, STrategy And Risk Reduction for Tsunamis in Europe). Sines has one of the most important deep-water ports, which has oil-bearing, petrochemical, liquid-bulk, coal, and container terminals. The port and its industrial infrastructures face the ocean southwest towards the main seismogenic sources. This work considers two different seismic zones: the Southwest Iberian Margin and the Gloria Fault. Within these two regions, we selected a total of six scenarios to assess the tsunami impact at the test site. The tsunami simulations are computed using NSWING, a Non-linear Shallow Water model wIth Nested Grids. In this study, the static effect of tides is analysed for three different tidal stages: MLLW (mean lower low water), MSL (mean sea level), and MHHW (mean higher high water). For each scenario, the tsunami hazard is described by maximum values of wave height, flow depth, drawback, maximum inundation area and run-up. Synthetic waveforms are computed at virtual tide gauges at specific locations outside and inside the harbour. The final results describe the impact at the Sines test site considering the single scenarios at mean sea level, the aggregate scenario, and the influence of the tide on the aggregate scenario. The results confirm the composite source of Horseshoe and Marques de Pombal faults as the worst-case scenario, with wave heights of over 10 m, which reach the coast approximately 22 min after the rupture. It dominates the aggregate scenario by about 60 % of the impact area at the test site, considering maximum wave height and maximum flow depth. The HSMPF scenario inundates a total area of 3.5 km2.

  20. Hydraulic Testing of Silurian and Ordovician Strata at the Bruce Site

    NASA Astrophysics Data System (ADS)

    Beauheim, R. L.; Avis, J. D.; Chace, D. A.; Roberts, R. M.; Toll, N. J.

    2009-05-01

    Ontario Power Generation is proposing a Deep Geologic Repository (DGR) for the long-term management of its Low and Intermediate Level Radioactive Waste (L&ILW) within a Paleozoic-age sedimentary sequence beneath the Bruce Site near Tiverton, Ontario, Canada. The concept envisions that the DGR would be excavated at a depth of approximately 680 m within the Ordovician Cobourg Formation, a massive, dense, argillaceous limestone. A key attribute of the Bruce site is the extremely low permeabilities associated with the thick Ordovician carbonate and argillaceous bedrock formations that will host and enclose the DGR. Such rock mass permeabilities are thought sufficiently low to contribute toward or govern a diffusion-dominated transport regime. To support this concept, hydraulic testing was performed in 2008 and 2009 in two deep boreholes at the proposed repository site, DGR-3 and DGR-4. The hydraulic testing was performed using a straddle-packer tool with a 30.74-m test interval. Sequential tests were performed over the entire open lengths of the boreholes from the F Unit of the Silurian Salina Formation into the Ordovician Gull River Formation, a distance of approximately 635 m. The tests consisted primarily of pressure-pulse tests, with a few slug tests performed in several of the higher permeability Silurian units. The tests are analyzed using the nSIGHTS code, which allows the entire pressure history a test interval has experienced since it was penetrated by the drill bit to be included in the test simulation. nSIGHTS also allows the model fit to the test data to be optimized over an n-dimensional parameter space to ensure that the final solution represents a true global minimum rather than simply a local minimum. The test results show that the Ordovician-age strata above the Coboconk Formation (70+ m below the Cobourg) have average horizontal hydraulic conductivities of 1E-13 m/s or less. Coboconk and Gull River hydraulic conductivities are as high as 1E-11 m/s. Hydraulic conductivities of the Silurian-age strata generally range from 1E-13 to 1E-11 m/s, with discrete test values approaching 1E-7 m/s associated with portions of the A2 and A1 Units of the Salina Formation and with the Guelph Formation.

  1. Computational Prediction and Experimental Verification of New MAP Kinase Docking Sites and Substrates Including Gli Transcription Factors

    PubMed Central

    Whisenant, Thomas C.; Ho, David T.; Benz, Ryan W.; Rogers, Jeffrey S.; Kaake, Robyn M.; Gordon, Elizabeth A.; Huang, Lan; Baldi, Pierre; Bardwell, Lee

    2010-01-01

    In order to fully understand protein kinase networks, new methods are needed to identify regulators and substrates of kinases, especially for weakly expressed proteins. Here we have developed a hybrid computational search algorithm that combines machine learning and expert knowledge to identify kinase docking sites, and used this algorithm to search the human genome for novel MAP kinase substrates and regulators focused on the JNK family of MAP kinases. Predictions were tested by peptide array followed by rigorous biochemical verification with in vitro binding and kinase assays on wild-type and mutant proteins. Using this procedure, we found new ‘D-site’ class docking sites in previously known JNK substrates (hnRNP-K, PPM1J/PP2Czeta), as well as new JNK-interacting proteins (MLL4, NEIL1). Finally, we identified new D-site-dependent MAPK substrates, including the hedgehog-regulated transcription factors Gli1 and Gli3, suggesting that a direct connection between MAP kinase and hedgehog signaling may occur at the level of these key regulators. These results demonstrate that a genome-wide search for MAP kinase docking sites can be used to find new docking sites and substrates. PMID:20865152

  2. Constraints, Approach, and Status of Mars Surveyor 2001 Landing Site Selection

    NASA Technical Reports Server (NTRS)

    Golombek, M.; Bridges, N.; Briggs, G.; Gilmore, M.; Haldemann, A.; Parker, T.; Saunders, R.; Spencer, D.; Smith, J.; Soderblom, L.

    1999-01-01

    There are many similarities between the Mars Surveyor '01 (MS '01) landing site selection process and that of Mars Pathfinder. The selection process includes two parallel activities in which engineers define and refine the capabilities of the spacecraft through design, testing and modeling and scientists define a set of landing site constraints based on the spacecraft design and landing scenario. As for Pathfinder, the safety of the site is without question the single most important factor, for the simple reason that failure to land safely yields no science and exposes the mission and program to considerable risk. The selection process must be thorough and defensible and capable of surviving multiple withering reviews similar to the Pathfinder decision. On Pathfinder, this was accomplished by attempting to understand the surface properties of sites using available remote sensing data sets and models based on them. Science objectives are factored into the selection process only after the safety of the site is validated. Finally, as for Pathfinder, the selection process is being done in an open environment with multiple opportunities for community involvement including open workshops, with education and outreach opportunities. Additional information is contained in the original extended abstract.

  3. [Groundwater organic pollution source identification technology system research and application].

    PubMed

    Wang, Xiao-Hong; Wei, Jia-Hua; Cheng, Zhi-Neng; Liu, Pei-Bin; Ji, Yi-Qun; Zhang, Gan

    2013-02-01

    Groundwater organic pollutions are found in large amount of locations, and the pollutions are widely spread once onset; which is hard to identify and control. The key process to control and govern groundwater pollution is how to control the sources of pollution and reduce the danger to groundwater. This paper introduced typical contaminated sites as an example; then carried out the source identification studies and established groundwater organic pollution source identification system, finally applied the system to the identification of typical contaminated sites. First, grasp the basis of the contaminated sites of geological and hydrogeological conditions; determine the contaminated sites characteristics of pollutants as carbon tetrachloride, from the large numbers of groundwater analysis and test data; then find the solute transport model of contaminated sites and compound-specific isotope techniques. At last, through groundwater solute transport model and compound-specific isotope technology, determine the distribution of the typical site of organic sources of pollution and pollution status; invest identified potential sources of pollution and sample the soil to analysis. It turns out that the results of two identified historical pollution sources and pollutant concentration distribution are reliable. The results provided the basis for treatment of groundwater pollution.

  4. Plaque removal efficacy of two children's toothbrushes: a one-month study.

    PubMed

    Benson, B J; Henyon, G; Grossman, E

    1993-01-01

    Reach Wonder Grip toothbrush for children was evaluated for plaque removal efficacy and compared to the Colgate Plus Junior (extra soft). The subjects appeared at the test site with overnight (14-18 hours) plaque accumulation. After qualifying for the study, sixty-eight (68) subjects were randomly assigned one of the test brushes. They then participated in the test evaluation at the clinical site wherein plaque levels were measured before and after a one minute brushing. Plaque removal efficacy was evaluated by the Global Plaque Index (percent of tooth surface covered by stained deposit). The subjects then used the assigned toothbrush at home for one month and returned to the test site to repeat the baseline evaluations. After their final plaque evaluations, the subjects were given a new toothbrush from each brand to use at home for one week and the subject and the parent were asked to complete a preference questionnaire. Sixty-seven (67) subjects completed the one month study. After one month's use of twice per day brushing, neither of the test toothbrushes demonstrated any evidence of oral irritation that could be related to toothbrushing. The results indicated that Reach Wonder Grip for Children was significantly more effective (p < 0.05) than Colgate Plus Junior in removing overall (Global) plaque at the initial exam period. The preference questionnaire indicated that the Reach Wonder Grip toothbrush was preferred by both the children and their parents. It is concluded that the new Reach Wonder Grip toothbrush for children is safe and effective for plaque removal.

  5. Installation-Restoration Program. Phase 2. Confirmation/quantification. Stage 1. Problem confirmation study: Otis Air National Guard Base, Massachusetts, Air National Guard Support Center, Andrews Air Force Base, Maryland. Final technical report, November 1983-July 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kraybill, R.L.; Smart, G.R.; Bopp, F.

    1985-09-04

    A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test-pit investigations were conducted at six sites. In addition, the contents of a sumpmore » tank, and two header pipes for fuel-transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority-pollutant volatile organic compounds and a GC fingerprint scan for fuel products. On the basis of the field-work findings, it is concluded that, to date, water-quality impacts on ground water from past activities have been minimal.« less

  6. Paleomagnetic and mineral magnetic constraints on Zn-Pb ore genesis in the Pend Oreille Mine, Metaline district, Washington, USA

    USGS Publications Warehouse

    Pannalal, S.J.; Symons, David T. A.; Leach, D.L.

    2007-01-01

    Zinc-lead mineralization in the Metaline mining district of northeastern Washington, USA, is hosted by the Cambrian Metaline Formation and is classified into Yellowhead-type (YO) and Josephine-type (JO) ore based on texture and mineralogy. Paleomagnetic results are reported for four Cambrian Metaline Formation sites, one Ordovician Ledbetter slate site, 12 YO and 13 JO (including two breccia sites) mineralization sites in the Pend Oreille Mine, and eight sites from the nearby Cretaceous Kaniksu granite batholith. Thermal and alternating field step demagnetization, saturation isothermal remanence analysis, and synthetic specimen tests show that the remanence in the host carbonates and Zn-Pb mineralization is carried mostly by pseudosingle (PSD) to single domain (SD) pyrrhotite and mostly by PSD to SD magnetite in the Kaniksu granite. Based on thermomagnetic measurements, sphalerite and galena concentrates and tailings from the mine's mill contain hexagonal and monoclimc pyrrhotite. The postfolding characteristic remanent magnetization (ChRM), known thermal data, and paleoarc method of dating suggest that the Zn-Pb mineralization carries a primary chemical remanent magnetization (CRM), and Metaline Formation carbonates a secondary CRM that were acquired during the Middle Jurassic (166 ??6 Ma) during the waning stages of the Nevadan orogeny. A paleomagnetic breccia test favours a solution-collapse origin for the Josephine breccia. Finally, the Kaniksu paleopole is concordant with the North American Cretaceous reference paleopole, suggesting the Kootenay terrane has not been rotated since emplacement of the batholith at ???94 Ma. ?? 2007 NRC Canada.

  7. Big maggots dig deeper: size-dependent larval dispersal in flies.

    PubMed

    Davis, Jeremy M; Coogan, Laura E; Papaj, Daniel R

    2015-09-01

    The ability of individual animals to select habitats optimal for development and survival can be constrained by the costs of moving through the environment. Animals that seek overwintering sites underground, for example, may be constrained by the energy required to burrow into the soil. We conducted field and laboratory studies to determine the relationship between individual size and overwintering site selection in the tephritid flies, Rhagoletis juglandis and Rhagoletis suavis. We also explored the effect of site selection on pupal mortality, parasitism, and the ability to emerge from overwintering sites after eclosion. In both species, and in both lab and field tests, larger pupae were found at deeper soil depths. In addition, marginally non-significant trends indicated pupae in deeper sites were 48% more likely to survive the overwintering period. Finally, larger individuals were more likely to eclose and emerge from the soil at a given depth, but flies in deep overwintering sites were less likely to emerge from those sites than flies in shallow sites. Our data indicate that overwintering site selection represents a trade-off between avoiding predators and parasites that occur at shallow sites, and the energetic and mortality costs of burrowing to, overwintering in, and emerging from, deeper sites. The size-dependent overwintering site selection demonstrated here has implications for population dynamics and pest control strategies. Some fly control measures, such as the introduction of parasites or predators, will be mitigated when the deepest and least accessible overwintering pupae represent a disproportionately large amount of the population's reproductive capacity.

  8. Deployment of IPv6-only CPU resources at WLCG sites

    NASA Astrophysics Data System (ADS)

    Babik, M.; Chudoba, J.; Dewhurst, A.; Finnern, T.; Froy, T.; Grigoras, C.; Hafeez, K.; Hoeft, B.; Idiculla, T.; Kelsey, D. P.; López Muñoz, F.; Martelli, E.; Nandakumar, R.; Ohrenberg, K.; Prelz, F.; Rand, D.; Sciabà, A.; Tigerstedt, U.; Traynor, D.

    2017-10-01

    The fraction of Internet traffic carried over IPv6 continues to grow rapidly. IPv6 support from network hardware vendors and carriers is pervasive and becoming mature. A network infrastructure upgrade often offers sites an excellent window of opportunity to configure and enable IPv6. There is a significant overhead when setting up and maintaining dual-stack machines, so where possible sites would like to upgrade their services directly to IPv6 only. In doing so, they are also expediting the transition process towards its desired completion. While the LHC experiments accept there is a need to move to IPv6, it is currently not directly affecting their work. Sites are unwilling to upgrade if they will be unable to run LHC experiment workflows. This has resulted in a very slow uptake of IPv6 from WLCG sites. For several years the HEPiX IPv6 Working Group has been testing a range of WLCG services to ensure they are IPv6 compliant. Several sites are now running many of their services as dual-stack. The working group, driven by the requirements of the LHC VOs to be able to use IPv6-only opportunistic resources, continues to encourage wider deployment of dual-stack services to make the use of such IPv6-only clients viable. This paper presents the working group’s plan and progress so far to allow sites to deploy IPv6-only CPU resources. This includes making experiment central services dual-stack as well as a number of storage services. The monitoring, accounting and information services that are used by jobs also need to be upgraded. Finally the VO testing that has taken place on hosts connected via IPv6-only is reported.

  9. Technical support for geopressured-geothermal activities in Louisiana. Final geological report, 1 November 1981-31 October 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pilger, R.H.

    1984-06-25

    This report contains the component Site-Specific Studies-Geophysics, Diagenesis, Geochemistry. Work for Site-Specific Studies is finished, and the results presented in this report are final. Individual studies have been entered separately into the data base. (ACR)

  10. Preliminary results of geothermal desalting operations at the East Mesa test site Imperial Valley, California

    NASA Technical Reports Server (NTRS)

    Suemoto, S. H.; Mathias, K. E.

    1974-01-01

    The Bureau of Reclamation has erected at its Geothermal Resource Development site two experimental test vehicles for the purpose of desalting hot fluids of geothermal origin. Both plants have as a feed source geothermal well Mesa 6-1 drilled to a total depth of 8,030 feet and having a bottom hole temperature of 400 F. Formation fluid collected at the surface contained 24,800 mg/1 total dissolved solids. The dissolved solids consist mainly of sodium chloride. A multistage distillation (3-stage) plant has been operated intermittently for one year with no operational problems. Functioning at steady-state conditions with a liquid feed rate of 70 g/m and a temperature of 221 F, the final brine blowdown temperature was 169 F. Product water was produced at a rate of about 2 g/m; average total dissolved solids content of the product was 170 mg/1. A product quality of 27.5 mg/1 at a pH of 9.5 was produced from the first stage.

  11. The uses of ERTS-1 imagery in the analysis of landscape change. [agriculture, strip mining forests, urban-suburban growth, and flooding in Tennessee, Kentucky, Mississippi, and Alabama

    NASA Technical Reports Server (NTRS)

    Rehder, J. B. (Principal Investigator)

    1974-01-01

    The author has identified the following significant results. The analysis of strip mining from ERTS-1 data has resulted in the mapping of landscape changes for the Cumberland Plateau Test Site. Several mapping experiments utilizing ERTS-1 data have been established for the mapping of state-wide land use regions. The first incorporates 12 frames of ERTS-1 imagery for the generalized thematic mapping of forest cover for the state of Tennessee. In another mapping effort, 14 ERTS-1 images have been analyzed for plowed ground signatures to produce a map of agricultural regions for Tennessee, Kentucky, and the northern portions of Mississippi and Alabama. Generalized urban land use categories and transportation networks have been determined from ERTS-1 imagery for the Knoxville Test Site. Finally, through the analysis of ERTS-1 imagery, short-lived phenomena such as the 1973 spring floods on the Mississippi River in western Tennessee, have been detected, monitored, and mapped.

  12. Detection of genomic loci associated with environmental variables using generalized linear mixed models.

    PubMed

    Lobréaux, Stéphane; Melodelima, Christelle

    2015-02-01

    We tested the use of Generalized Linear Mixed Models to detect associations between genetic loci and environmental variables, taking into account the population structure of sampled individuals. We used a simulation approach to generate datasets under demographically and selectively explicit models. These datasets were used to analyze and optimize GLMM capacity to detect the association between markers and selective coefficients as environmental data in terms of false and true positive rates. Different sampling strategies were tested, maximizing the number of populations sampled, sites sampled per population, or individuals sampled per site, and the effect of different selective intensities on the efficiency of the method was determined. Finally, we apply these models to an Arabidopsis thaliana SNP dataset from different accessions, looking for loci associated with spring minimal temperature. We identified 25 regions that exhibit unusual correlations with the climatic variable and contain genes with functions related to temperature stress. Copyright © 2014 Elsevier Inc. All rights reserved.

  13. Using synthetic bacterial enhancers to reveal a looping-based mechanism for quenching-like repression

    PubMed Central

    Brunwasser-Meirom, Michal; Pollak, Yaroslav; Goldberg, Sarah; Levy, Lior; Atar, Orna; Amit, Roee

    2016-01-01

    We explore a model for ‘quenching-like' repression by studying synthetic bacterial enhancers, each characterized by a different binding site architecture. To do so, we take a three-pronged approach: first, we compute the probability that a protein-bound dsDNA molecule will loop. Second, we use hundreds of synthetic enhancers to test the model's predictions in bacteria. Finally, we verify the mechanism bioinformatically in native genomes. Here we show that excluded volume effects generated by DNA-bound proteins can generate substantial quenching. Moreover, the type and extent of the regulatory effect depend strongly on the relative arrangement of the binding sites. The implications of these results are that enhancers should be insensitive to 10–11 bp insertions or deletions (INDELs) and sensitive to 5–6 bp INDELs. We test this prediction on 61 σ54-regulated qrr genes from the Vibrio genus and confirm the tolerance of these enhancers' sequences to the DNA's helical repeat. PMID:26832446

  14. Using synthetic bacterial enhancers to reveal a looping-based mechanism for quenching-like repression.

    PubMed

    Brunwasser-Meirom, Michal; Pollak, Yaroslav; Goldberg, Sarah; Levy, Lior; Atar, Orna; Amit, Roee

    2016-02-02

    We explore a model for 'quenching-like' repression by studying synthetic bacterial enhancers, each characterized by a different binding site architecture. To do so, we take a three-pronged approach: first, we compute the probability that a protein-bound dsDNA molecule will loop. Second, we use hundreds of synthetic enhancers to test the model's predictions in bacteria. Finally, we verify the mechanism bioinformatically in native genomes. Here we show that excluded volume effects generated by DNA-bound proteins can generate substantial quenching. Moreover, the type and extent of the regulatory effect depend strongly on the relative arrangement of the binding sites. The implications of these results are that enhancers should be insensitive to 10-11 bp insertions or deletions (INDELs) and sensitive to 5-6 bp INDELs. We test this prediction on 61 σ(54)-regulated qrr genes from the Vibrio genus and confirm the tolerance of these enhancers' sequences to the DNA's helical repeat.

  15. Focused Feasibility Study Final Health and Safety Plan. Beach Point Test Site, Aberdeen Proving Ground, Edgewood Area, Maryland.

    DTIC Science & Technology

    1993-10-01

    brimmed hats can help prevent sunburn. Chronic exposure to UV radiation is known to cause skin cancer. In case of sunburn, do not apply burn ointment ...personnel who have the potential to be exposed to hazardous or toxic substances or environments during the course of field activities. Each member of the...investigations who are exposed or potentially exposed to hazardous substances or health hazards at or above the established exposure levels for these substances

  16. Decontamination of Explosives-Contaminated Range Scrap Using a Transportable Hot Gas Decontamination System

    DTIC Science & Technology

    2003-05-01

    I I I I FINAL • Composition B (TNT, RDX and wax), • Tetryl, • Smokeless Powder ( Nitrocellulose /Nitrogylcerin), and • HBX (TNT, RDX, aluminum...operating-cost system. Because of its temporary, on-site configuration, this is an inherently low-cost method to decontaminate range residue. On... methods ) were evaluated and progressively improved during each test run. 022/masterdocument.doc 4-12 I I I I I I I I I I I I I I I I

  17. Archaeological Test Excavations of the Historic Component of 45-WT-1 Texas City/Riparia, Whitman County, Washington, 1983.

    DTIC Science & Technology

    1984-01-01

    information on the history of Riparia and visited the site during excavations, identifying areas of the historic town. Della Mae Evans also shared with us the...only historic overview photograph we had seen of Riparia and led us to 1967 newspaper articles about the final demise of the town. Jerry Jones of the...Colfax Gazette tracked down photographs of Riparia which had been taken in 1966 and provided us with copies. Washing, processing, and cataloguing of

  18. Preliminary design of a solar central receiver for a site-specific repowering application (Saguaro Power Plant). Volume IV. Appendixes. Final report, October 1982-September 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, E.R.

    1983-09-01

    The appendixes for the Saguaro Power Plant includes the following: receiver configuration selection report; cooperating modes and transitions; failure modes analysis; control system analysis; computer codes and simulation models; procurement package scope descriptions; responsibility matrix; solar system flow diagram component purpose list; thermal storage component and system test plans; solar steam generator tube-to-tubesheet weld analysis; pipeline listing; management control schedule; and system list and definitions.

  19. RDI Task Final Report of Research and Development of Software, Ballistic Test Site Terminal.

    DTIC Science & Technology

    1984-01-01

    Vf’~~.Veb . 6* U- .~ .. A0A$i 9.NrtY% . . APPENDIX P -SUBROUTINE DESCRIPTIONS FORTRAN callable subprograms written in FORTRAN. ANSWR DELAY LABL RPTER...CKOVL IYT2 RDNAR WSCNR CLEAR JBCD RDVM ZERO CNTRL JDATA REVNT ZSPLN FORTRAN callable subprograms written in assembler IASRD IOPSY NCKT -p- w...u *p* * * FORTRAN CALLABLE SUBPROGRAMS WRITTEN IN FORTRAN SUBROUTINE ANSWR(LU,KDEV, ICODE, IENTRY,RVAL, IVAL), REV*C 04DEC83 $ CLF

  20. Long-Term Management Strategy for Dredged Material Disposal for Naval Facilities at Pearl Harbor, Hawaii Phase III - Analysis of Alternatives and Development of an LTMS

    DTIC Science & Technology

    2000-03-01

    are needed to restrict contaminants losses via the leachate and volatilization pathways. Plant uptake testing indicated a potential need to restrict...or control future use of the site, to amend the material with soil additives, to phytoremediate , or to provide a final surface cover of clean...initial release including toxicity and bioaccumulation, effluent, runoff, leachate , plant uptake, upland and aquatic animal uptake, and

  1. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 5, Dewatering report. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    This report provides an update on dewatering activities at the Durango disposal embankment and presents recommendations for the work required to complete the closure of the cell in 1990 (Section 2). In October 1989, test pit investigations were performed and a toe trench was excavated at the eastern slope of the disposal embankment. A description and results of the test pit investigations along with the implications . of the results relative to the over . all dewatering effort are discussed in Sections 3 through 5. Installation and performance of the 17-well dewatering system were previously described in` the ``StatusReport onmore » Dewatering of Disposal Embankment`` issued in September, 1989. Additional studies are still on-going and are described in Section 6. Laboratory analysis continues on samples taken from the test pits. TAC`s characterization of the hydrogeological conditions at the Durango site is also proceeding. Results of these studies will be presented in subsequent reports. Appendices A and B present construction details of the well point system, toe trench and holding pond. Appendix C summarizes the performance-of the 17 pumping wells prior to winter shutdown and provides information on pumping rates, drawdowns, and disposition of the wells. Appendix D outlines the chronology of the dewatering effort to date.« less

  2. Method for Identifying Probable Archaeological Sites from Remotely Sensed Data

    NASA Technical Reports Server (NTRS)

    Tilton, James C.; Comer, Douglas C.; Priebe, Carey E.; Sussman, Daniel

    2011-01-01

    Archaeological sites are being compromised or destroyed at a catastrophic rate in most regions of the world. The best solution to this problem is for archaeologists to find and study these sites before they are compromised or destroyed. One way to facilitate the necessary rapid, wide area surveys needed to find these archaeological sites is through the generation of maps of probable archaeological sites from remotely sensed data. We describe an approach for identifying probable locations of archaeological sites over a wide area based on detecting subtle anomalies in vegetative cover through a statistically based analysis of remotely sensed data from multiple sources. We further developed this approach under a recent NASA ROSES Space Archaeology Program project. Under this project we refined and elaborated this statistical analysis to compensate for potential slight miss-registrations between the remote sensing data sources and the archaeological site location data. We also explored data quantization approaches (required by the statistical analysis approach), and we identified a superior data quantization approached based on a unique image segmentation approach. In our presentation we will summarize our refined approach and demonstrate the effectiveness of the overall approach with test data from Santa Catalina Island off the southern California coast. Finally, we discuss our future plans for further improving our approach.

  3. FINAL REPORT (DE-FG02-97ER62338): Single-column modeling, GCM parameterizations, and ARM data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richard C. J. Somerville

    2009-02-27

    Our overall goal is the development of new and improved parameterizations of cloud-radiation effects and related processes, using ARM data at all three ARM sites, and the implementation and testing of these parameterizations in global models. To test recently developed prognostic parameterizations based on detailed cloud microphysics, we have compared SCM (single-column model) output with ARM observations at the SGP, NSA and TWP sites. We focus on the predicted cloud amounts and on a suite of radiative quantities strongly dependent on clouds, such as downwelling surface shortwave radiation. Our results demonstrate the superiority of parameterizations based on comprehensive treatments ofmore » cloud microphysics and cloud-radiative interactions. At the SGP and NSA sites, the SCM results simulate the ARM measurements well and are demonstrably more realistic than typical parameterizations found in conventional operational forecasting models. At the TWP site, the model performance depends strongly on details of the scheme, and the results of our diagnostic tests suggest ways to develop improved parameterizations better suited to simulating cloud-radiation interactions in the tropics generally. These advances have made it possible to take the next step and build on this progress, by incorporating our parameterization schemes in state-of-the-art three-dimensional atmospheric models, and diagnosing and evaluating the results using independent data. Because the improved cloud-radiation results have been obtained largely via implementing detailed and physically comprehensive cloud microphysics, we anticipate that improved predictions of hydrologic cycle components, and hence of precipitation, may also be achievable.« less

  4. Modelling macroseismic observations for historical earthquakes: the cases of the M = 7.0, 1954 Sofades and M = 6.8, 1957 Velestino events (central Greece)

    NASA Astrophysics Data System (ADS)

    Papazachos, Giannis; Papazachos, Costas; Skarlatoudis, Andreas; Kkallas, Harris; Lekkas, Efthimios

    2016-01-01

    We attempt to model the spatial distribution of the strong ground motion for the large M = 7.0, 1954 Sofades and M = 6.8, 1957 Velestino events (southern Thessaly basin, central Greece), using the macroseismic intensities ( I M M up to 9+) observed within the broader Thessaly area. For this reason, we employ a modified stochastic method realised by the EXSIM algorithm for extended sources, in order to reproduce the damage distribution of these earthquakes, in an attempt to combine existing earthquake information and appropriate scaling relations with surface geology and to investigate the efficiency of the available macroseismic data. For site-effects assessment, we use a new digital geological map of the broader Thessaly basin, where geological formations are grouped by age and mapped on appropriate NEHRP soil classes. Using the previous approach, we estimate synthetic time series for different rupture scenarios and employ various calibrating relations between PGA/PGV and macroseismic intensity, allowing the generation of synthetic (stochastic) isoseismals. Also, different site amplification factors proposed for the broader Aegean area, according to local geology, are tested. Finally, we also perform a sensitivity analysis of the fault location, taking into account the available neotectonic data for the broader southern Thessaly fault zone. The finally determined fault locations are different than previously proposed, in agreement with the available neotectonic information. The observed macroseismic intensities are in good agreement with the ones derived from the synthetic waveforms, verifying both the usefulness of the approach, as well as of the macroseismic data used. Finally, site-effects show clear correlation with the geological classification employed, with constant amplification factors for each soil class generally providing better results than generic transfer functions.

  5. Evaluating Ecological Risk to Invertebrate Receptors from PAHs in Sediments at Hazardous Waste Sites (Final Report)

    EPA Science Inventory

    EPA's Ecological Risk Assessment Support Center (ERASC) announced the release of the final report, Evaluating Ecological Risk to Invertebrate Receptors from PAHs in Sediments at Hazardous Waste Sites. The report provides an overview of an approach for assessing risk to ...

  6. Occidental vertical modified in situ process for the recovery of oil from oil shale. Phase II. Quarterly progress report, September 1, 1980-November 30, 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-01-01

    The major activities at OOSI's Logan Wash site during the quarter were: mining the voids at all levels for Retorts 7 and 8; blasthole drilling; tracer testing MR4; conducting the start-up and burner tests on MR3; continuing the surface facility construction; and conducting Retorts 7 and 8 related Rock Fragmentation tests. Environmental monitoring continued during the quarter, and the data and analyses are discussed. Sandia National Laboratory and Laramie Energy Technology Center (LETC) personnel were active in the DOE support of the MR3 burner and start-up tests. In the last section of this report the final oil inventory for Retortmore » 6 production is detailed. The total oil produced by Retort 6 was 55,696 barrels.« less

  7. Deep Vadose Zone Treatability Test of Soil Desiccation for the Hanford Central Plateau: Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Truex, Michael J.; Chronister, Glen B.; Strickland, Christopher E.

    Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths where direct exposure pathways are not of concern, but may need to be remediated to protect groundwater. The Department of Energy developed a treatability test program for technologies to address Tc-99 and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment, have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. The treatability test of desiccation described herein was conducted as an element of the deep vadose zonemore » treatability test program. Desiccation was shown to be a potentially effective vadose zone remediation technology to protect groundwater when used in conjunction with a surface infiltration barrier.« less

  8. General Review On The Investigations Conducted At Institute Saint-Louis (ISL) In The Field Of Holographic Nondestructive Testing

    NASA Astrophysics Data System (ADS)

    Smigielski, P.

    1982-10-01

    Among the various methods presently used in the field of nondestructive testing, optical holography is expected to become a very useful and promising tool in the near future. In fact, holography offers a number of advantages which should be briefly outlined here : direct and overall visualization of defects (disbonding, formation of cracks, inhomogeneities...) on large sufaces (of several square meters). Furthermore there is no interaction with the object under test and the surface to be studied has not to be treated. Finally holography is characterized by a high spatial resolution and a great sensitivity (it is possible to detect deformations as small as a few microns). In contrast to other modern techniques,holography is relatively unexpensive and can be used on-site with pulsed lasers. The general principles of holography and of methods using holographic interferometry will be recalled (double-exposure holographic interferometry, real-time holographic interferometry, "time-average" holographic interferometry). Thereafter the activities in which ISL is presently engaged will be reported briefly, that is laboratory feasibility tests and experiments conducted on-site in an industrial environment with the aid, in general, of pulsed ruby lasers : testing of adhesive bonding in solid propellant rockers and in aircraft structures, detection and observation of cracking in fatigue tests, visua-lization of the modes of vibration of mechanical structures, experiments conducted on air-craft subjected to maintenance checking, etc.

  9. Presence of pro-tobacco messages on the Web.

    PubMed

    Hong, Traci; Cody, Michael J

    2002-01-01

    Ignored in the finalized Master Settlement Agreement (National Association of Attorneys General, 1998), the unmonitored, unregulated World Wide Web (Web) can operate as a major vehicle for delivering pro-tobacco messages, images, and products to millions of young consumers. A content analysis of 318 randomly sampled pro-tobacco Web sites revealed that tobacco has a pervasive presence on the Web, especially on e-commerce sites and sites featuring hobbies, recreation, and "fetishes." Products can be ordered online on nearly 50% of the sites, but only 23% of the sites included underage verification. Further, only 11% of these sites contain health warnings. Instead, pro-tobacco sites frequently associate smoking with "glamorous" and "alternative" lifestyles, and with images of young males and young (thin, attractive) females. Finally, many of the Web sites offered interactive site features that are potentially appealing to young Web users. Recommendations for future research and counterstrategies are discussed.

  10. Identification of B. anthracis N(5)-carboxyaminoimidazole ribonucleotide mutase (PurE) active site binding compounds via fragment library screening.

    PubMed

    Lei, Hao; Jones, Christopher; Zhu, Tian; Patel, Kavankumar; Wolf, Nina M; Fung, Leslie W-M; Lee, Hyun; Johnson, Michael E

    2016-02-15

    The de novo purine biosynthesis pathway is an attractive target for antibacterial drug design, and PurE from this pathway has been identified to be crucial for Bacillus anthracis survival in serum. In this study we adopted a fragment-based hit discovery approach, using three screening methods-saturation transfer difference nucleus magnetic resonance (STD-NMR), water-ligand observed via gradient spectroscopy (WaterLOGSY) NMR, and surface plasmon resonance (SPR), against B. anthracis PurE (BaPurE) to identify active site binding fragments by initially testing 352 compounds in a Zenobia fragment library. Competition STD NMR with the BaPurE product effectively eliminated non-active site binding hits from the primary hits, selecting active site binders only. Binding affinities (dissociation constant, KD) of these compounds varied between 234 and 301μM. Based on test results from the Zenobia compounds, we subsequently developed and applied a streamlined fragment screening strategy to screen a much larger library consisting of 3000 computationally pre-selected fragments. Thirteen final fragment hits were confirmed to exhibit binding affinities varying from 14μM to 700μM, which were categorized into five different basic scaffolds. All thirteen fragment hits have ligand efficiencies higher than 0.30. We demonstrated that at least two fragments from two different scaffolds exhibit inhibitory activity against the BaPurE enzyme. Published by Elsevier Ltd.

  11. Stochastic injection-strategy optimization for the preliminary assessment of candidate geological storage sites

    NASA Astrophysics Data System (ADS)

    Cody, Brent M.; Baù, Domenico; González-Nicolás, Ana

    2015-09-01

    Geological carbon sequestration (GCS) has been identified as having the potential to reduce increasing atmospheric concentrations of carbon dioxide (CO2). However, a global impact will only be achieved if GCS is cost-effectively and safely implemented on a massive scale. This work presents a computationally efficient methodology for identifying optimal injection strategies at candidate GCS sites having uncertainty associated with caprock permeability, effective compressibility, and aquifer permeability. A multi-objective evolutionary optimization algorithm is used to heuristically determine non-dominated solutions between the following two competing objectives: (1) maximize mass of CO2 sequestered and (2) minimize project cost. A semi-analytical algorithm is used to estimate CO2 leakage mass rather than a numerical model, enabling the study of GCS sites having vastly different domain characteristics. The stochastic optimization framework presented herein is applied to a feasibility study of GCS in a brine aquifer in the Michigan Basin (MB), USA. Eight optimization test cases are performed to investigate the impact of decision-maker (DM) preferences on Pareto-optimal objective-function values and carbon-injection strategies. This analysis shows that the feasibility of GCS at the MB test site is highly dependent upon the DM's risk-adversity preference and degree of uncertainty associated with caprock integrity. Finally, large gains in computational efficiency achieved using parallel processing and archiving are discussed.

  12. 75 FR 77229 - Federal Requirements Under the Underground Injection Control (UIC) Program for Carbon Dioxide (CO2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ...This action finalizes minimum Federal requirements under the Safe Drinking Water Act (SDWA) for underground injection of carbon dioxide (CO2) for the purpose of geologic sequestration (GS). GS is one of a portfolio of options that could be deployed to reduce CO2 emissions to the atmosphere and help to mitigate climate change. This final rule applies to owners or operators of wells that will be used to inject CO2 into the subsurface for the purpose of long-term storage. It establishes a new class of well, Class VI, and sets minimum technical criteria for the permitting, geologic site characterization, area of review (AoR) and corrective action, financial responsibility, well construction, operation, mechanical integrity testing (MIT), monitoring, well plugging, post-injection site care (PISC), and site closure of Class VI wells for the purposes of protecting underground sources of drinking water (USDWs). The elements of this rulemaking are based on the existing Underground Injection Control (UIC) regulatory framework, with modifications to address the unique nature of CO2 injection for GS. This rule will help ensure consistency in permitting underground injection of CO2 at GS operations across the United States and provide requirements to prevent endangerment of USDWs in anticipation of the eventual use of GS to reduce CO2 emissions to the atmosphere and to mitigate climate change.

  13. Interpretation of hydraulic tests performed at a carbonate rock site for CO2 storage

    NASA Astrophysics Data System (ADS)

    María Gómez Castro, Berta; Fernández López, Sheila; Carrera, Jesús; de Simone, Silvia; Martínez, Lurdes; Roetting, Tobias; Soler, Joaquim; Ortiz, Gema; de Dios, Carlos; Huber, Christophe

    2014-05-01

    Interpretation of hydraulic tests performed at a carbonate rock site for CO2 storage Berta Gómez, Sheila Fernández, Tobias Roetting, Lurdes Martínez, Silvia de Simone, Joaquim Soler, Jesus Carrera, Gema Ortiz, Christophe Huber, Carlos de Dios Proper design of CO2 geological storage facilities requires knowledge of the reservoir hydraulic parameters. Specifically, permeability controls the flux of CO2, the rate at which it dissolves, local and regional pressure buildup and the likelihood of induced seismicity. Permeability is obtained from hydraulic tests, which may yield local permeability, which controls injectivity, and large scale permeability, which controls pressure buildup at the large scale. If pressure response measurements are obtained at different elevations, hydraulic tests may also yield vertical permeability, which controls the rate at which CO2 dissolves. The objective of this work is to discuss the interpretation of hydraulic tests at deep reservoirs and the conditions under which these permeabilities can be obtained. To achieve this objective, we have built a radially symmetric model, including a skin and radial as well as vertical heterogeneity. We use this model to simulate hydraulic tests with increasing degrees of complexity about the medium response. We start by assuming Darcy flow, then add coupled mechanical effects (fractures opening) and, finally, we add thermal effects. We discuss how these affect the conventional interpretation of the tests and how to identify their presence. We apply these findings to the interpretation of hydraulic tests at Hontomin.

  14. Fiscal Year 2012 Revegetation Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenifer Nordstrom

    2012-11-01

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: • Summary of each site • Assessment of vegetation status and site stabilization at each location • Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achievedmore » final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.« less

  15. SINGLE HEATER TEST FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.B. Cho

    The Single Heater Test is the first of the in-situ thermal tests conducted by the U.S. Department of Energy as part of its program of characterizing Yucca Mountain in Nevada as the potential site for a proposed deep geologic repository for the disposal of spent nuclear fuel and high-level nuclear waste. The Site Characterization Plan (DOE 1988) contained an extensive plan of in-situ thermal tests aimed at understanding specific aspects of the response of the local rock-mass around the potential repository to the heat from the radioactive decay of the emplaced waste. With the refocusing of the Site Characterization Planmore » by the ''Civilian Radioactive Waste Management Program Plan'' (DOE 1994), a consolidated thermal testing program emerged by 1995 as documented in the reports ''In-Situ Thermal Testing Program Strategy'' (DOE 1995) and ''Updated In-Situ Thermal Testing Program Strategy'' (CRWMS M&O 1997a). The concept of the Single Heater Test took shape in the summer of 1995 and detailed planning and design of the test started with the beginning fiscal year 1996. The overall objective of the Single Heater Test was to gain an understanding of the coupled thermal, mechanical, hydrological, and chemical processes that are anticipated to occur in the local rock-mass in the potential repository as a result of heat from radioactive decay of the emplaced waste. This included making a priori predictions of the test results using existing models and subsequently refining or modifying the models, on the basis of comparative and interpretive analyses of the measurements and predictions. A second, no less important, objective was to try out, in a full-scale field setting, the various instruments and equipment to be employed in the future on a much larger, more complex, thermal test of longer duration, such as the Drift Scale Test. This ''shake down'' or trial aspect of the Single Heater Test applied not just to the hardware, but also to the teamwork and cooperation between multiple organizations performing their part in the test.« less

  16. Addendum to the Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  17. Addendum to the Closure Report for Corrective Action Unit 423: Area 3 Building 03-60 Underground Discharge Point, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  18. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less

  19. Fish-Friendly Hydropower Turbine Development & Deployment: Alden Turbine Preliminary Engineering and Model Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foust, J.; Hecker, G.; Li, S.

    2011-10-01

    The Alden turbine was developed through the U.S. Department of Energy's (DOE's) former Advanced Hydro Turbine Systems Program (1994-2006) and, more recently, through the Electric Power Research Institute (EPRI) and the DOE's Wind & Water Power Program. The primary goal of the engineering study described here was to provide a commercially competitive turbine design that would yield fish passage survival rates comparable to or better than the survival rates of bypassing or spilling flow. Although the turbine design was performed for site conditions corresponding to 92 ft (28 m) net head and a discharge of 1500 cfs (42.5 cms), themore » design can be modified for additional sites with differing operating conditions. During the turbine development, design modifications were identified for the spiral case, distributor (stay vanes and wicket gates), runner, and draft tube to improve turbine performance while maintaining features for high fish passage survival. Computational results for pressure change rates and shear within the runner passage were similar in the original and final turbine geometries, while predicted minimum pressures were higher for the final turbine. The final turbine geometry and resulting flow environments are expected to further enhance the fish passage characteristics of the turbine. Computational results for the final design were shown to improve turbine efficiencies by over 6% at the selected operating condition when compared to the original concept. Prior to the release of the hydraulic components for model fabrication, finite element analysis calculations were conducted for the stay vanes, wicket gates, and runner to verify that structural design criteria for stress and deflections were met. A physical model of the turbine was manufactured and tested with data collected for power and efficiency, cavitation limits, runaway speed, axial and radial thrust, pressure pulsations, and wicket gate torque. All parameters were observed to fall within ranges expected for conventional radial flow machines. Based on these measurements, the expected efficiency peak for prototype application is 93.64%. These data were used in the final sizing of the supporting mechanical and balance of plant equipment. The preliminary equipment cost for the design specification is $1450/kW with a total supply schedule of 28 months. This equipment supply includes turbine, generator, unit controls, limited balance of plant equipment, field installation, and commissioning. Based on the selected head and flow design conditions, fish passage survival through the final turbine is estimated to be approximately 98% for 7.9-inch (200-mm) fish, and the predicted survival reaches 100% for fish 3.9 inches (100 mm) and less in length. Note that fish up to 7.9- inches (200 mm) in length make up more than 90% of fish entrained at hydro projects in the United States. Completion of these efforts provides a mechanical and electrical design that can be readily adapted to site-specific conditions with additional engineering development comparable to costs associated with conventional turbine designs.« less

  20. Cleanups In My Community (CIMC) - Superfund National Priority List (NPL) Sites, National Layer

    EPA Pesticide Factsheets

    This data layer provides access to Superfund National Priority List Sites as part of the CIMC web service. Superfund is a program administered by the EPA to locate, investigate, and clean up worst hazardous waste sites throughout the United States. EPA administers the Superfund program in cooperation with individual states and tribal governments. These sites include abandoned warehouses, manufacturing facilities, processing plants, and landfills - the key word here being abandoned.Only NPL sites have been included in Cleanups in My Community thus far. EPA maintains the NPL, which identifies for the States and the public those sites or other releases that appear to warrant remedial (long term) actions. These NPL sites fall into the following categories:Proposed: Sites may be proposed for the NPL and then may be placed on the NPL as final or be removed from the Proposed NPL.Final: Those sites placed on the NPL are called final, and for these sites, a cleanup remedy is selected and implemented. However, it may be several years after construction of the remedy is completed before the hazardous substances are completely cleaned up or controlled in place.Deleted: After the clean up process is complete, and appropriate reviews confirm the area is cleaned up or the hazards are controlled, sites can be deleted from the NPL.For more information on the data provided through this web service, please see the processing steps below, and see more information here: https://www.

  1. Waveform generation in the EETS

    NASA Astrophysics Data System (ADS)

    Wilshire, J. P.

    1985-05-01

    Design decisions and analysis for the waveform generation portion of an electrical equipment test set are discussed. This test set is unlike conventional ATE in that it is portable and designed to operate in forward area sites for the USMC. It is also unique in that it provides for functional testing for 32 electronic units from the AV-88 Harrier II aircraft. Specific requirements for the waveform generator are discussed, including a wide frequency range, high resolution and accuracy, and low total harmonic distortion. Several approaches to meet these requirements are considered and a specific concept is presented in detail, which consists of a digitally produced waveform that feeds a deglitched analog conversion circuit. Rigorous mathematical analysis is presented to prove that this concept meets the requirements. Finally, design alternatives and enhancements are considered.

  2. Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less

  3. Biological and Behavioral Risks for Incident Chlamydia trachomatis Infection in a Prospective Cohort

    PubMed Central

    Hwang, Loris Y.; Ma, Yifei; Moscicki, Anna-Barbara

    2014-01-01

    Objective To identify biological and behavioral risks for incident Chlamydia trachomatis among a prospective cohort of young women followed frequently. Methods Our cohort of 629 women from two outpatient sites was seen every 4 months (October 2000 through April 2012) for behavioral interviews and infection testing. C trachomatis was tested annually, and anytime patients reported symptoms or possible exposure using commercial nucleic acid amplification tests. Analyses excluded baseline prevalent C trachomatis infections. Risk factors for incident C trachomatis were assessed using Cox proportional hazards models. Significant risks (p<0.10) from bivariate models were entered in a multivariate model, adjusted for four covariates chosen a priori (age, race or ethnicity, condom use, study site). Backwards step-wise elimination produced a final parsimonious model retaining significant variables (p<0.05) and the four adjustment variables. Results The 629 women attended 9,594 total visits. Median follow-up time was 6.9 years (interquartile range 3.2-9.8), during which 97 (15%) women had incident C trachomatis . In the final multivariate model, incident C trachomatis was independently associated with HPV at the preceding visit (p<0.01), smoking (p=0.02), and weekly use of substances besides alcohol and marijuana (p<0.01) since prior visit. Among 207 women with available colpophotographs (1,742 visits), cervical ectopy was not a significant risk factor (p range=0.16-0.39 for ectopy as continuous and ordinal variables). Conclusion Novel risks for C trachomatis include preceding HPV, smoking, and substance use, which may reflect both biological and behavioral mechanisms of risk, such as immune modulation, higher-risk sexual networks, or both. Improved understanding of the biological bases for C trachomatis risk would inform our strategies for C trachomatis control. PMID:25437724

  4. OBSERVATIONAL STUDY OF FINAL CLEANING AND AHERA CLEARANCE SAMPLING AT ASBESTOS-ABATEMENT SITES IN NEW JERSEY

    EPA Science Inventory

    A study was conducted during the summer of 1988 to document final cleaning procedures and evaluate Asbestos Hazard Emergency Response Act (AHERA) clearance air sampling practices used at 20 asbestos-abatement sites in New Jersey. Each abatement took place in a school building and...

  5. 10 CFR 960.3-2-2-5 - Formal site nomination.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-5 Formal site nomination. After the final... determines suitable for site characterization for the selection of a repository site, and, in so doing, he...

  6. Dewatering Treatment Scale-up Testing Results of Hanford Tank Wastes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tedeschi, A.R.; May, T.H.; Bryan, W.E.

    2008-07-01

    This report documents CH2M HILL Hanford Group Inc. (CH2M HILL) 2007 dryer testing results in Richland, WA at the AMEC Nuclear Ltd., GeoMelt Division (AMEC) Horn Rapids Test Site. It provides a discussion of scope and results to qualify the dryer system as a viable unit-operation in the continuing evaluation of the bulk vitrification process. A 10,000 liter (L) dryer/mixer was tested for supplemental treatment of Hanford tank low activity wastes, drying and mixing a simulated non-radioactive salt solution with glass forming minerals. Testing validated the full scale equipment for producing dried product similar to smaller scale tests, and qualifiedmore » the dryer system for a subsequent integrated dryer/vitrification test using the same simulant and glass formers. The dryer system is planned for installation at the Hanford tank farms to dry/mix radioactive waste for final treatment evaluation of the supplemental bulk vitrification process. (authors)« less

  7. Site Selection for the Disposal of LLW in Taiwan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chuang, W.S.; Chi, L.M.; Tien, N.C.

    2006-07-01

    This paper presents the implementation status of the low-level radioactive waste (LLW) disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes and preliminary disposal concepts. The first phase of site selection for low-level radioactive waste final disposal in Taiwan was implemented between 1992 and 2002. The site selection process adopted a Geographic Information System (GIS), Hierarchical Analysis System, Expert Evaluation System, and site reconnaissance. An incentive program for voluntary sites was also initiated. After a series of evaluations and discussion of 30 potentialmore » candidate sites, including 8 recommended sites, 5 qualified voluntary townships, and several remote uninhabited small islets, Hsiao-chiou islet was selected as the first priority candidate site in February 1998. The geological investigation work in Hsiao-chiou was conducted from March 1999 through October 2000. An Environmental Impact Statement Report (EIS) and the Investment Feasibility Study Report (IFS) were submitted to the Environmental Protection Agency (EPA) in November 2000 and to the Ministry of Economic Affairs (MOEA) in June 2001, respectively. Unfortunately, the site investigation was discontinued in 2002 due to political and public acceptance consideration. After years of planning, the second phase of the site selection process was launched in August 2004 and will be conducted through 2008. It is planned that a repository will be constructed in early 2009 and start to operate in 2014. The site selection process for the second phase is based on the earlier work and four potential candidate sites were selected for evaluation until 2005. A near surface disposal concept is proposed for a site located in the Taiwan strait, and cavern disposal concepts are proposed for three other sites located on the main island. This paper presents the implementation status of the LLW disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes, and preliminary disposal concepts 'NIMBY' (Not in my backyard) is a critical problem for implementation of the final disposal project. Resistance from local communities has been continuously received during site characterization. To overcome this, an incentive program to encourage community acceptance has been approved by the Government. Programs for community promotion are being proposed and negotiations are also underway. (authors)« less

  8. Field studies of beach cones as coastal erosion control/reversal devices for areas with significant oil and gas activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-17

    A field demonstration/study of a novel shoreline erosion protection device called beach cones is planned. These patented, fiberglass- reinforced concreted devices are to be deployed in a number of geometric patterns at seven location in the Bastian Bay area of Western Plaquemines Parish. The purpose of the work described in this report was to evaluate the proposed study's impact on living and non-living shellfish resources within each of the project's seven separate Study Areas. Major accomplishments for this reporting period were as follows: aerial photographs of the experimental sites were taken; all permit applications were filed; information was submitted formore » the Environmental Report; several reconnaissance trips to the experimental sites were made; meetings were held among all participating organizations to further plan the research; permit was obtained from the US Army Corps of Engineers; test sites were surveyed by the Xavier University contingent; survey data were taken at all sites; the Oyster Assessment was completed; permit was obtained from the State of Louisiana Department of Natural Resources; and initial survey data were finalized at all sites.« less

  9. Prevalence of Anaplasma phagocytophilum in small rodents in France.

    PubMed

    Chastagner, A; Moinet, M; Perez, G; Roy, E; McCoy, K D; Plantard, O; Agoulon, A; Bastian, S; Butet, A; Rantier, Y; Verheyden, H; Cèbe, N; Leblond, A; Vourc'h, G

    2016-07-01

    Anaplasma phagocytophilum is an emerging zoonotic tick-borne pathogen affecting a wide range of mammals. Rodents are suspected to be natural reservoirs for this bacterium, but their role in the epidemiologic cycles affecting domestic animals and wild ungulates has not been demonstrated. This study aimed to improve our knowledge on A. phagocytophilum prevalence in Apodemus sylvaticus, A. flavicollis and Myodes glareolus using data collected in 2010 in one area in eastern France and in 2012-2013 in two others areas in western France. Rodents were captured in each site and infection was tested using qualitative real-time PCR assays on either blood or spleen samples. Prevalence showed high variability among sites. The highest prevalence was observed in the most eastern site (with an average infection rate of 22.8% across all species), whereas no rodent was found to be PCR positive in the south-west site and only 6.6% were positive in the north-west of France. Finally, a significant increase in prevalence was observed in autumn samples compared to spring samples in the north-west, but no change was found in the other two sites. Copyright © 2016 Elsevier GmbH. All rights reserved.

  10. Coconut coir as biosorbent for Cr(VI) removal from laboratory wastewater.

    PubMed

    Gonzalez, Mário H; Araújo, Geórgia C L; Pelizaro, Claudia B; Menezes, Eveline A; Lemos, Sherlan G; de Sousa, Gilberto Batista; Nogueira, Ana Rita A

    2008-11-30

    A high cost-effective treatment of sulphochromic waste is proposed employing a raw coconut coir as biosorbent for Cr(VI) removal. The ideal pH and sorption kinetic, sorption capacities, and sorption sites were the studied biosorbent parameters. After testing five different isotherm models with standard solutions, Redlich-Peterson and Toth best fitted the experimental data, obtaining a theoretical Cr(VI) sorption capacity (SC) of 6.3 mg g(-1). Acid-base potentiometric titration indicated around of 73% of sorption sites were from phenolic compounds, probably lignin. Differences between sorption sites in the coconut coir before and after Cr adsorption identified from Fourier transform infrared spectra suggested a modification of sorption sites after sulphochromic waste treatment, indicating that the sorption mechanism involves organic matter oxidation and chromium uptake. For sulphocromic waste treatment, the SC was improved to 26.8+/-0.2 mg g(-1), and no adsorbed Cr(VI) was reduced, remaining only Cr(III) in the final solution. The adsorbed material was calcinated to obtain Cr(2)O(3,) with a reduction of more than 60% of the original mass.

  11. Investigating electronic word-of-mouth effects on online discussion forums: the role of perceived positive electronic word-of-mouth review credibility.

    PubMed

    Chih, Wen-Hai; Wang, Kai-Yu; Hsu, Li-Chun; Huang, Su-Chen

    2013-09-01

    Electronic word of mouth (eWOM) has been an important factor influencing consumer purchase decisions. Using the ABC model of attitude, this study proposes a model to explain how eWOM affects online discussion forums. Specifically, we propose that platform (Web site reputation and source credibility) and customer (obtaining buying-related information and social orientation through information) factors influence purchase intentions via perceived positive eWOM review credibility, as well as product and Web site attitudes in an online community context. A total of 353 online discussion forum users in an online community (Fashion Guide) in Taiwan were recruited, and structural equation modeling (SEM) was used to test the research hypotheses. The results indicate that Web site reputation, source credibility, obtaining buying-related information, and social orientation through information positively influence perceived positive eWOM review credibility. In turn, perceived positive eWOM review credibility directly influences purchase intentions and also indirectly influences purchase intentions via product and Web site attitudes. Finally, we discuss the theoretical and managerial implications of the findings.

  12. The systematic development of ROsafe: an intervention to promote STI testing among vocational school students.

    PubMed

    Wolfers, Mireille; de Zwart, Onno; Kok, Gerjo

    2012-05-01

    This article describes the development of ROsafe, an intervention to promote sexually transmitted infection (STI) testing at vocational schools in the Netherlands. Using the planning model of intervention mapping (IM), an educational intervention was designed that consisted of two lessons, an Internet site, and sexual health services at the school sites. IM is a stepwise approach for theory- and evidence-based development and implementation of interventions. It includes six steps: needs assessment, specification of the objectives in matrices, selection of theoretical methods and practical strategies, program design, implementation planning, and evaluation. The processes and outcomes that are performed during Steps 1 to 4 of IM are presented, that is, literature review and qualitative and quantitative research in needs assessment, leading to the definition of the desired behavioral outcomes and objectives. The matrix of change objectives for STI-testing behavior is presented, and then the development of theory into program is described, using examples from the program. Finally, the planning for implementation and evaluation is discussed. The educational intervention used methods that were derived from the social cognitive theory, the elaboration likelihood model, the persuasive communication matrix, and theories about risk communication. Strategies included short movies, discussion, knowledge quiz, and an interactive behavioral self-test through the Internet.

  13. Installation-restoration program. Phase 2. Confirmation/quantification. Stage 1 for Shaw Air Force Base, South Carolina. Final report, January 1984-October 1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alexander, W.J.; Liddle, S.K.

    1986-09-01

    The primary objectives of this project were to collect and analyze groundwater, surface water, and sediment samples and to perform an initial characterization of the hydrogeochemical regime at potential contamination sites on Shaw Air Force Base near Sumter, South Carolina. This study constituted Phase II of the U.S. Air Force Installation Restoration Program (IRP). Five potential sources of groundwater pollution were studied. The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of groundwater monitoring wells, and the analyses of soil, surface water, and groundwater samples. Also used in the study were field measurements ofmore » water quality, water-level measurements site observations, published hydrogeologic data and Shaw AFB documents.« less

  14. Mechanism of Intramembrane Cleavage of Alcadeins by γ-Secretase

    PubMed Central

    Piao, Yi; Kimura, Ayano; Urano, Satomi; Saito, Yuhki; Taru, Hidenori; Yamamoto, Tohru; Hata, Saori; Suzuki, Toshiharu

    2013-01-01

    Background Alcadein proteins (Alcs; Alcα, Alcβand Alcγ) are predominantly expressed in neurons, as is Alzheimer's β-amyloid (Aβ) precursor protein (APP). Both Alcs and APP are cleaved by primary α- or β-secretase to generate membrane-associated C-terminal fragments (CTFs). Alc CTFs are further cleaved by γ-secretase to secrete p3-Alc peptide along with the release of intracellular domain fragment (Alc ICD) from the membrane. In the case of APP, APP CTFβ is initially cleaved at the ε-site to release the intracellular domain fragment (AICD) and consequently the γ-site is determined, by which Aβ generates. The initial ε-site is thought to define the final γ-site position, which determines whether Aβ40/43 or Aβ42 is generated. However, initial intracellular ε-cleavage sites of Alc CTF to generate Alc ICD and the molecular mechanism that final γ-site position is determined remains unclear in Alcs. Methodology Using HEK293 cells expressing Alcs plus presenilin 1 (PS1, a catalytic unit of γ-secretase) and the membrane fractions of these cells, the generation of p3-Alc possessing C-terminal γ-cleavage site and Alc ICD possessing N-terminal ε-cleavage site were analysed with MALDI-TOF/MS. We determined the initial ε-site position of all Alcα, Alcβ and Alcγ, and analyzed the relationship between the initially determined ε-site position and the final γ-cleavage position. Conclusions The initial ε-site position does not always determine the final γ-cleavage position in Alcs, which differed from APP. No additional γ-cleavage sites are generated from artificial/non-physiological positions of ε-cleavage for Alcs, while the artificial ε-cleavage positions can influence in selection of physiological γ-site positions. Because alteration of γ-secretase activity is thought to be a pathogenesis of sporadic Alzheimer's disease, Alcs are useful and sensitive substrate to detect the altered cleavage of substrates by γ-secretase, which may be induced by malfunction of γ-secretase itself or changes of membrane environment for enzymatic reaction. PMID:23658629

  15. High-temperature Strain Sensor and Mounting Development

    NASA Technical Reports Server (NTRS)

    Williams, W. Dan; Lei, Jih-Fen; Reardon, Lawrence F.; Krake, Keith; Lemcoe, M. M.; Holmes, Harlan K.; Moore, Thomas C., Sr.

    1996-01-01

    This report describes Government Work Package Task 29 (GWP29), whose purpose was to develop advanced strain gage technology in support of the National Aerospace Plane (NASP) Program. The focus was on advanced resistance strain gages with a temperature range from room temperature to 2000 F (1095 C) and on methods for reliably attaching these gages to the various materials anticipated for use in the NASP program. Because the NASP program required first-cycle data, the installed gages were not prestabilized or heat treated on the test coupons before first-cycle data were recorded. NASA Lewis Research Center, the lead center for GWP29, continued its development of the palladium-chromium gage; NASA Langley Research Center investigated a new concept gage using Kanthal A1; and the NASA Dryden Flight Research Center chose the well-known BCL-3 iron-chromium-aluminum gage. Each center then tested all three gages. The parameters investigated were apparent strain, drift strain, and gage factor as a function of temperature, plus gage size and survival rate over the test period. Although a significant effort was made to minimize the differences in test equipment between the three test sites (e.g., the same hardware and software were used for final data processing), the center employed different data acquisition systems and furnace configurations so that some inherent differences may be evident in the final results.

  16. Mass analysis of neutral particles and ions released during electrical breakdowns on spacecraft surfaces

    NASA Technical Reports Server (NTRS)

    Kendall, B. R. F.

    1985-01-01

    Charged-particle fluxes from breakdown events were studied. Methods to measure mass spectra and total emitted flux of neutral particles were developed. The design and construction of the specialized mass spectrometer was completed. Electrical breakdowns were initiated by a movable blunt contact touching the insulating surface. The contact discharge apparatus was used for final development of two different high-speed recording systems and for measurements of the composition of the materials given off by the discharge. It was shown that intense instantaneous fluxes of neutral particles were released from the sites of electrical breakdown events. A laser micropulse mass analyzer showed that visible discoloration at breakdown sites were correllated with the presence of iron on the polymer side of the film, presumably caused by punch-through to the Inconel backing. Kapton samples irradiated by an oxygen ion beam were tested. The irradiated samples were free of surface hydrocarbon contamination but otherwise behaved in the same way as the Kapton samples tested earlier. Only the two samples exposed to oxygen ion bombardment were relatively clean. This indicates an additional variable that should be considered when testing spacecraft materials in the laboratory.

  17. Use of a Fish Transportation Barge for Increasing Returns of Steelhead Imprinted for Homing, Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harmon, Jerrel R.

    1989-08-01

    The objective of this 7-year National Fisheries Service study, which began is 1982, was to determine if transporting juvenile steelhead (Oncorhynchus mykiss) by truck and barge from Dworshak National Fish Hatchery (NFH), on the Clearwater River, to a release site on the Columbia River below Bonneville Dam would result in increased returns of adults to the various fisheries and to the hatchery homing site. During 1982 and 1983, over 500,000 marked juvenile steelhead were serially released as controls from the hatchery or barged as test fish to below Bonneville Dam. Recoveries of marked adults to various recovery sites are complete.more » Fish released in 1983 showed a stronger homing ability and more rapid upstream migration than test fish released in 1982. Most adults from both control and test releases in 1983 and control releases in 1982 migrated a considerable distance upstream and overwintered in the Snake and Clearwater Rivers--behavior similar to Clearwater River fish previously transported from Lower Granite Dam. In contrast, many of the adults from test releases in 1982 failed to migrate upstream during the fall, overwintered in the Columbia River, and migrated upstream the following spring. Survival of control fish released at Dworshak NFH in late April 1982 was substantially higher than survival of those released in mid-May. Survival and homing of control fish released in late April and early May 1983 were over 10 times that for fish released in late May. Return of adults from normal hatchery releases in 1982 was the highest ever observed at Dworshak NFH.« less

  18. Large Block Test Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lin, W

    2001-12-01

    This report documents the Large-Block Test (LBT) conducted at Fran Ridge near Yucca Mountain, Nevada. The LBT was a thermal test conducted on an exposed block of middle non-lithophysal Topopah Spring tuff (Tptpmn) and was designed to assist in understanding the thermal-hydrological-mechanical-chemical (THMC) processes associated with heating and then cooling a partially saturated fractured rock mass. The LBT was unique in that it was a large (3 x 3 x 4.5 m) block with top and sides exposed. Because the block was exposed at the surface, boundary conditions on five of the six sides of the block were relatively wellmore » known and controlled, making this test both easier to model and easier to monitor. This report presents a detailed description of the test as well as analyses of the data and conclusions drawn from the test. The rock block that was tested during the LBT was exposed by excavation and removal of the surrounding rock. The block was characterized and instrumented, and the sides were sealed and insulated to inhibit moisture and heat loss. Temperature on the top of the block was also controlled. The block was heated for 13 months, during which time temperature, moisture distribution, and deformation were monitored. After the test was completed and the block cooled down, a series of boreholes were drilled, and one of the heater holes was over-cored to collect samples for post-test characterization of mineralogy and mechanical properties. Section 2 provides background on the test. Section 3 lists the test objectives and describes the block site, the site configuration, and measurements made during the test. Section 3 also presents a chronology of events associated with the LBT, characterization of the block, and the pre-heat analyses of the test. Section 4 describes the fracture network contained in the block. Section 5 describes the heating/cooling system used to control the temperature in the block and presents the thermal history of the block during the test. Sections 5 through 9 report the measurements made on the block during the preheating, heating, and cooling phases. These measurements include temperature, thermal conductivity and diffusivity, hydrological measurements (electrical resistivity, neutron logging, gas pressure, and relative humidity), geomechanics, selected chemical analyses, and microbial activity. These sections also include analyses and simulations of the block behavior. Finally, conclusions are presented in Section 10. Complete data sets were submitted during the time the test was conducted. The data tracking numbers (DTNs) of all of the data are presented in Table 1-1.« less

  19. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada With Errata Sheets, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pat Matthews

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less

  20. Climatology of atmospheric PM10 concentration in the Po Valley

    NASA Astrophysics Data System (ADS)

    Bigi, A.; Ghermandi, G.

    2014-01-01

    The limits to atmospheric pollutant concentration set by the European Commission provide a challenging target for the municipalities in the Po Valley, because of the characteristic climatic conditions and high population density of this region. In order to assess climatology and trends in the concentration of atmospheric particles in the Po Valley, a dataset of PM10 data from 41 sites across the Po Valley have been analysed, including both traffic and background sites (either urban, suburban or rural). Of these 41 sites, 18 with 10 yr or longer record have been analysed for long term trend in de-seasonalized monthly means, in annual quantiles and in monthly frequency distribution. A widespread significant decreasing trend has been observed at most sites, up to few percent per year, by Generalised Least Square and Theil-Sen method. All 41 sites have been tested for significant weekly periodicity by Kruskal-Wallis test for mean anomalies and by Wilcoxon test for weekend effect magnitude. A significant weekly periodicity has been observed for most PM10 series, particularly in summer and ascribed mainly to anthropic particulate emissions. A cluster analysis has been applied in order to highlight stations sharing similar pollution conditions over the reference period. Five clusters have been found, two gathering the metropolitan areas of Torino and Milano and their respective nearby sites and the other three clusters gathering north-east, north-west and central Po Valley sites respectively. Finally the observed trends in atmospheric PM10 have been compared to trends in provincial emissions of particulates and PM precursors, and analysed along with data on vehicular fleet age, composition and fuel sales. Significant basin-wide drop in emissions occurred for gaseous pollutants, contrarily to emissions of PM10 and PM2.5, whose drop resulted low and restricted to few provinces. It is not clear whether the decrease for only gaseous emissions is sufficient to explain the observed drop in atmospheric PM10, or if the low drop in particulate emissions is indeed due to the uncertainty in the emission inventory data for this species.

  1. Long-term trend and variability of atmospheric PM10 concentration in the Po Valley

    NASA Astrophysics Data System (ADS)

    Bigi, A.; Ghermandi, G.

    2014-05-01

    The limits to atmospheric pollutant concentration set by the European Commission provide a challenging target for the municipalities in the Po Valley, because of the characteristic climatic conditions and high population density of this region. In order to assess climatology and trends in the concentration of atmospheric particles in the Po Valley, a data set of PM10 data from 41 sites across the Po Valley have been analysed, including both traffic and background sites (either urban, suburban or rural). Of these 41 sites, 18 with 10 yr or longer record have been analysed for long-term trend in deseasonalized monthly means, in annual quantiles and in monthly frequency distribution. A widespread significant decreasing trend has been observed at most sites, up to a few percent per year, by a generalized least squares and Theil-Sen method. All 41 sites have been tested for significant weekly periodicity by Kruskal-Wallis test for mean anomalies and by Wilcoxon test for weekend effect magnitude. A significant weekly periodicity has been observed for most PM10 series, particularly in summer and ascribed mainly to anthropic particulate emissions. A cluster analysis has been applied in order to highlight stations sharing similar pollution conditions over the reference period. Five clusters have been found, two encompassing the metropolitan areas of Turin and Milan and their respective nearby sites and the other three clusters gathering northeast, northwest and central Po Valley sites respectively. Finally, the observed trends in atmospheric PM10 have been compared to trends in provincial emissions of particulates and PM precursors, and analysed along with data on vehicular fleet age, composition and fuel sales. A significant basin-wide drop in emissions occurred for gaseous pollutants, contrarily to emissions of PM10 and PM2.5, whose drop was low and restricted to a few provinces. It is not clear whether the decrease for only gaseous emissions is sufficient to explain the observed drop in atmospheric PM10, or if the low drop in particulate emissions is indeed due to the uncertainty in the emission inventory data for this species.

  2. Human Health and Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory Volume 1: Report of Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallegos, G; Daniels, J; Wegrecki, A

    2006-04-24

    This document contains the human health and ecological risk assessment for the Resource Recovery and Conservation Act (RCRA) permit renewal for the Explosives Waste Treatment Facility (EWTF). Volume 1 is the text of the risk assessment, and Volume 2 (provided on a compact disc) is the supporting modeling data. The EWTF is operated by the Lawrence Livermore National Laboratory (LLNL) at Site 300, which is located in the foothills between the cities of Livermore and Tracy, approximately 17 miles east of Livermore and 8 miles southwest of Tracy. Figure 1 is a map of the San Francisco Bay Area, showingmore » the location of Site 300 and other points of reference. One of the principal activities of Site 300 is to test what are known as ''high explosives'' for nuclear weapons. These are the highly energetic materials that provide the force to drive fissionable material to criticality. LLNL scientists develop and test the explosives and the integrated non-nuclear components in support of the United States nuclear stockpile stewardship program as well as in support of conventional weapons and the aircraft, mining, oil exploration, and construction industries. Many Site 300 facilities are used in support of high explosives research. Some facilities are used in the chemical formulation of explosives; others are locations where explosive charges are mechanically pressed; others are locations where the materials are inspected radiographically for such defects as cracks and voids. Finally, some facilities are locations where the machined charges are assembled before they are sent to the on-site test firing facilities, and additional facilities are locations where materials are stored. Wastes generated from high-explosives research are treated by open burning (OB) and open detonation (OD). OB and OD treatments are necessary because they are the safest methods for treating explosives wastes generated at these facilities, and they eliminate the requirement for further handling and transportation that would be required if the wastes were treated off site.« less

  3. Challenges with Final Status Surveys at a Large Decommissioning Site - 13417

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Downey, Heath; Collopy, Peter; Shephard, Eugene

    2013-07-01

    As part of decommissioning a former nuclear fuel manufacturing site, one of the crucial final steps is to conduct Final Status Surveys (FSS) in order to demonstrate compliance with the release criteria. At this decommissioning site, the area for FSS was about 100 hectares (248 acres) and included varying terrain, wooded areas, ponds, excavations, buildings and a brook. The challenges in performing the FSS included determining location, identifying FSS units, logging gamma walkover survey data, determining sample locations, managing water in excavations, and diverting water in the brook. The approaches taken to overcome these challenges will be presented in themore » paper. The paper will present and discuss lessons learned that will aid others in the FSS process. (authors)« less

  4. Geological considerations in hazardouswaste disposal

    NASA Astrophysics Data System (ADS)

    Cartwright, K.; Gilkeson, R. H.; Johnson, T. M.

    1981-12-01

    Present regulations assume that long-term isolation of hazardous wastes — including toxic chemical, biological, radioactive, flammable and explosive wastes — may be effected by disposal in landfills that have liners of very low hydraulic conductivity. In reality, total isolation of wastes in humid areas is not possible; some migration of leachate from wastes buried in the gound will always occur. Regulations should provide performance standards applicable on a site-by-site basis rather than rigid criteria for site selection and design. The performance standards should take into account several factors: (1) the categories, segregation, degradation and toxicity of the wastes; (2) the site hydrogeology, which governs the direction and rate of contaminant transport; (3) the attenuation of contaminants by geochemical interactions with geologic materials; and (4) the release rate of unattenuated pollutants to surface or groundwater. An adequate monitoring system is essential. The system should both test the extent to which the operation of the site meets performance standards and provide sufficient warning of pollution problems to allow implementation of remedial measures. In recent years there has been a trend away from numerous, small disposal sites toward fewer and larger sites. The size of a disposal site should be based on the attenuation capacity of the geologic material, which has a finite, though generally not well-defined, limit. For slowly degradable wastes, engineered sites with leachate-collection systems appear to be only a temporary solution since the leachate collected will also require final disposal.

  5. Geological considerations in hazardouswaste disposal

    USGS Publications Warehouse

    Cartwright, K.; Gilkeson, R.H.; Johnson, T.M.

    1981-01-01

    Present regulations assume that long-term isolation of hazardous wastes - including toxic chemical, biological, radioactive, flammable and explosive wastes - may be effected by disposal in landfills that have liners of very low hydraulic conductivity. In reality, total isolation of wastes in humid areas is not possible; some migration of leachate from wastes buried in the gound will always occur. Regulations should provide performance standards applicable on a site-by-site basis rather than rigid criteria for site selection and design. The performance standards should take into account several factors: (1) the categories, segregation, degradation and toxicity of the wastes; (2) the site hydrogeology, which governs the direction and rate of contaminant transport; (3) the attenuation of contaminants by geochemical interactions with geologic materials; and (4) the release rate of unattenuated pollutants to surface or groundwater. An adequate monitoring system is essential. The system should both test the extent to which the operation of the site meets performance standards and provide sufficient warning of pollution problems to allow implementation of remedial measures. In recent years there has been a trend away from numerous, small disposal sites toward fewer and larger sites. The size of a disposal site should be based on the attenuation capacity of the geologic material, which has a finite, though generally not well-defined, limit. For slowly degradable wastes, engineered sites with leachate-collection systems appear to be only a temporary solution since the leachate collected will also require final disposal. ?? 1981.

  6. Seismic site coefficients and acceleration design response spectra based on conditions in South Carolina : final report.

    DOT National Transportation Integrated Search

    2014-11-15

    The simplified procedure in design codes for determining earthquake response spectra involves : estimating site coefficients to adjust available rock accelerations to site accelerations. Several : investigators have noted concerns with the site coeff...

  7. A new French-Italian geomagnetic observatory in Dome C, Antarctica

    NASA Astrophysics Data System (ADS)

    Cafarella, L.; Zirizzotti, A.; di Mauro, D.; Schott, J. J.; Pèrès, A.; Cantin, J. M.

    2003-04-01

    Concordia is a scientific station located in the inner part of Antarctica (latitude 75° 06' S, longitude 123° 23' E, at about 3,200 m above sea level), about 950 km away from the coast. Near by the station a permanent Base is under construction and is expected to open in the year 2004. All this is the result of a join French Italian Antarctic Programs (IFRTP and PNRA respectively) effort to provide support to a growing number of scientific researches. The station is located 1.200 from Terra Nova Bay (Italy), 560 km away from Vostok Station (Russia), 1.100 Km from Dumont D'Urville (France) and Casey (Australia). During the 1998-1999 and 1999-2000 expeditions in Antarctica, some preliminary tests were carried out in order to evaluate the suitability of Dome C site for a permanent geomagnetic observatory. Two parallel data acquisition systems, each equipped with overhauser and flux-gate magnetometers were installed in two shelters at about 300 m from the Base camp. After some tests and checks, the site was considered a good site for geomagnetic investigations. The instrumentation is now in France and in Italy to prepare the instruments and the acquisition systems for the final installation that will take place during the 2004-2005 expedition.

  8. Data Homogenization of the NOAA Long-Term Ozonesonde Records

    NASA Astrophysics Data System (ADS)

    Johnson, B.; Cullis, P.; Sterling, C. W.; Jordan, A. F.; Hall, E. G.; Petropavlovskikh, I. V.; Oltmans, S. J.; Mcconville, G.

    2015-12-01

    The NOAA long term balloon-borne ozonesonde sites at Boulder, Colorado; Hilo, Hawaii; and South Pole Station, Antarctica have measured weekly ozone profiles for more than 3 decades. The ozonesonde consists of an electrochemical concentration cell (ECC) sensor interfaced with a weather radiosonde which transmits high resolution ozone and meteorological data during ascent from the surface to 30-35 km altitude. During this 30 year time period there have been several model changes in the commercially available ECC ozonesondes and radiosondes as well as three adjustments in the ozone sensor solution composition at NOAA. These changes were aimed at optimizing the ozonesonde performance. Organized intercomparison campaigns conducted at the environmental simulation facility at the Research Centre Juelich, Germany and international field site testing have been the primary process for assessing new designs, instruments, or sensor solution changes and developing standard operating procedures. NOAA has also performed in-house laboratory tests and launched 28 dual ozonesondes at various sites since 1994 to provide further comparison data to determine the optimum homogenized data set. The final homogenization effort involved reviewing and editing several thousand individual ozonesonde profiles followed by applying the optimum correction algorithms for changes in type of sensor solution composition. The results of improved data sets will be shown with long term trends and uncertainties at various altitude levels.

  9. Subchronic toxicity studies on 1,3,5-trinitrobenzene, l,3-dinitrobenzene, and tetryl in rats. Final report, 15 January 1992-20 September 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reddy, T.V.; Daniel, F.B.; Robinson, M.

    Nitroaromatics, such as 1 ,3-dinitrobenzene (DNB), 1 ,3,5-trinitrobenzene (TN B), and N-methyl-N,2,4,6-tetranitroaniline (tetryl), have been detected as environmental contaminants of groundwater and soil near production sites and in some instances at military test grounds. DNB is formed as a by-product during 2,4,6-trinitrotoluene (TNT) production. It is also formed through photochemical oxidative degradation of 2,4- dinitrotoluene a by-product released into the environment from TNT manufacturing (Spanggord et.al., 1980). DNB and TNB are not easily biodegradable, persist in the environment, eventually leach out, and contaminate groundwater near waste disposal sites. Tetryl is an explosive that has been in use, largely for militarymore » purposes, since 1906. Wastewaters and soil at the original production sites and other plants devoted to munitions assembly, contain large quantities of these compounds (Walsh and Jenkins, 1992).« less

  10. A GIS-BASED MULTI-CRITERIA EVALUATION SYSTEM FOR SELECTION OF LANDFILL SITES: a case study from Abu Dhabi, United Arab Emirates

    NASA Astrophysics Data System (ADS)

    Issa, S. M.; Shehhi, B. Al

    2012-07-01

    Landfill sites receive 92% of total annual solid waste produced by municipalities in the emirate of Abu Dhabi. In this study, candidate sites for an appropriate landfill location for the Abu Dhabi municipal area are determined by integrating geographic information systems (GIS) and multi-criteria evaluation (MCE) analysis. To identify appropriate landfill sites, eight input map layers including proximity to urban areas, proximity to wells and water table depth, geology and topography, proximity to touristic and archeological sites, distance from roads network, distance from drainage networks, and land slope are used in constraint mapping. A final map was generated which identified potential areas showing suitability for the location of the landfill site. Results revealed that 30% of the study area was identified as highly suitable, 25% as suitable, and 45% as unsuitable. The selection of the final landfill site, however, requires further field research.

  11. Building dismantlement and site remediation at the Apollo Fuel Plant: When is technology the answer?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walton, L.

    1995-01-01

    The Apollo fuel plant was located in Pennsylvania on a site known to have been used continuously for stell production from before the Civil War until after World War II. Then the site became a nuclear fuel chemical processing plants. Finally it was used to convert uranium hexafluoride to various oxide fuel forms. After the fuel manufacturing operations were teminated, the processing equipment was partially decontaminated, removed, packaged and shipped to a licensed low-level radioactive waste burial site. The work was completed in 1984. In 1990 a detailed site characterization was initiated to establishe the extent of contamination and tomore » plan the building dismantlement and soil remediation efforts. This article discusses the site characterization and remedial action at the site in the following subsections: characterization; criticality control; mobile containment; soil washing; in-process measurements; and the final outcome of the project.« less

  12. Final Report for the Testing of the Y-12 Criticality Accident Alarm System Detectors at the Godiva IV Burst Reactor (IER-443)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scorby, John C.; Hickman, David; Hudson, Becka

    This report documents the experimental conditions and final results for the performance testing of the Y-12 Criticality Accident Alarm System (CAAS) detectors at the Godiva IV Burst Reactor at the National Criticality Experimental Research Center (NCERC) at the Nevada National Security Site (NNSS). The testing followed a previously issued test plan and was conducted during the week of July 17, 2017, with completion on Thursday July 20. The test subjected CAAS detectors supplied by Y-12 to very intense and short duration mixed neutron and gamma radiation fields to establish compliance to maximum radiation and minimum pulse width requirements. ANSI/ANS- 8.3.1997more » states that the “system shall be sufficiently robust as to actuate an alarm signal when exposed to the maximum radiation expected”, which has been defined at Y-12, in Documented Safety Analyses (DSAs), to be a dose rate of 10 Rad/s. ANSI/ANS-8.3.1997 further states that “alarm actuation shall occur as a result of a minimum duration transient” which may be assumed to be 1 msec. The pulse widths and dose rates provided by each burst during the test exceeded those requirements. The CAAS detectors all provided an immediate alarm signal and remained operable after the bursts establishing compliance to the requirements and fitness for re-deployment at Y-12.« less

  13. Design and Installation of a Disposal Cell Cover Field Test

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benson, C.H.; Waugh, W.J.; Albright, W.H.

    2011-02-27

    The U.S. Department of Energy’s Office of Legacy Management (LM) initiated a cover assessment project in September 2007 to evaluate an inexpensive approach to enhancing the hydrological performance of final covers for disposal cells. The objective is to accelerate and enhance natural processes that are transforming existing conventional covers, which rely on low-conductivity earthen barriers, into water balance covers, that store water in soil and release it as soil evaporation and plant transpiration. A low conductivity cover could be modified by deliberately blending the upper layers of the cover profile and planting native shrubs. A test facility was constructed atmore » the Grand Junction, Colorado, Disposal Site to evaluate the proposed methodology. The test cover was constructed in two identical sections, each including a large drainage lysimeter. The test cover was constructed with the same design and using the same materials as the existing disposal cell in order to allow for a direct comparison of performance. One test section will be renovated using the proposed method; the other is a control. LM is using the lysimeters to evaluate the effectiveness of the renovation treatment by monitoring hydrologic conditions within the cover profile as well as all water entering and leaving the system. This paper describes the historical experience of final covers employing earthen barrier layers, the design and operation of the lysimeter test facility, testing conducted to characterize the as-built engineering and edaphic properties of the lysimeter soils, the calibration of instruments installed at the test facility, and monitoring data collected since the lysimeters were constructed.« less

  14. Scenario based approach for multiple source Tsunami Hazard assessment for Sines, Portugal

    NASA Astrophysics Data System (ADS)

    Wronna, M.; Omira, R.; Baptista, M. A.

    2015-08-01

    In this paper, we present a scenario-based approach for tsunami hazard assessment for the city and harbour of Sines - Portugal, one of the test-sites of project ASTARTE. Sines holds one of the most important deep-water ports which contains oil-bearing, petrochemical, liquid bulk, coal and container terminals. The port and its industrial infrastructures are facing the ocean southwest towards the main seismogenic sources. This work considers two different seismic zones: the Southwest Iberian Margin and the Gloria Fault. Within these two regions, we selected a total of six scenarios to assess the tsunami impact at the test site. The tsunami simulations are computed using NSWING a Non-linear Shallow Water Model With Nested Grids. In this study, the static effect of tides is analysed for three different tidal stages MLLW (mean lower low water), MSL (mean sea level) and MHHW (mean higher high water). For each scenario, inundation is described by maximum values of wave height, flow depth, drawback, runup and inundation distance. Synthetic waveforms are computed at virtual tide gauges at specific locations outside and inside the harbour. The final results describe the impact at Sines test site considering the single scenarios at mean sea level, the aggregate scenario and the influence of the tide on the aggregate scenario. The results confirm the composite of Horseshoe and Marques Pombal fault as the worst case scenario. It governs the aggregate scenario with about 60 % and inundates an area of 3.5 km2.

  15. Level II Cultural Resource investigation for the Texoma Distribution Enhancements project, Cameron and Calcasieu Parishes, Louisiana: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LeeDecker, C. H.; Holland, C. C.

    A Level II Cultural Resource Survey was completed for the Texoma Distribution Enhancements project, located in Cameron and Calcasieu Parishes, Louisiana. The 13-mile pipeline extends from Strategic Petroleum Reserve No. 3 to a terminus near Vincent Landing. Located in Louisiana's southwest coastal zone, the pipeline will traverse extensive marsh lands as well as upland prairie terrace areas. Present land use within the project area consists primarily of undeveloped marsh land and cattle range. The study methods included background research, intensive pedestrian survey with systematic shovel testing, a boat survey, and laboratory analysis of recovered artifact collections. One historic site, 16CU205,more » was identified during the field survey, and it was tested for National Register eligibility. The site is assignable to the Industrialization and Modernization (1890-1940) Cultural Unit. Archaeological testing indicates that it is a rural residence or farmstead, with a house and one outbuilding within the proposed right-of-way. The site lacks significant historical association and sufficient archaeological integrity to merit inclusion on the National Register of Historic Places. Four standing structures were also identified during the field survey. The structures are agricultural outbuildings, less than 40 years in age, that possess no architectural distinction or historical association. They have been documented photographically and by scaled plan drawings, but do not merit additional study prior to their destruction. 24 refs., 15 figs., 3 tabs.« less

  16. Pyrrole and Fused Pyrrole Compounds with Bioactivity against Inflammatory Mediators.

    PubMed

    Said Fatahala, Samar; Hasabelnaby, Sherifa; Goudah, Ayman; Mahmoud, Ghada I; Helmy Abd-El Hameed, Rania

    2017-03-17

    A new series of pyrrolopyridines and pyrrolopyridopyrimidines have been synthesized from aminocyanopyrroles. The synthesized compounds have been characterized by FTIR, ¹H-NMR and mass spectroscopy. The final compounds have been screened for in vitro pro-inflammatory cytokine inhibitory and in vivo anti-inflammatory activity. The biological results revealed that among all tested compounds some fused pyrroles, namely the pyrrolopyridines 3i and 3l , show promising activity. A docking study of the active synthesized molecules confirmed the biological results and revealed a new binding pose in the COX-2 binding site.

  17. PRELIMINARY DATA REPORT: HUMATE INJECTION AS AN ENHANCED ATTENUATION METHOD AT THE F-AREA SEEPAGE BASINS, SAVANNAH RIVER SITE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millings, M.

    2013-09-16

    A field test of a humate technology for uranium and I-129 remediation was conducted at the F-Area Field Research Site as part of the Attenuation-Based Remedies for the Subsurface Applied Field Research Initiative (ABRS AFRI) funded by the DOE Office of Soil and Groundwater Remediation. Previous studies have shown that humic acid sorbed to sediments strongly binds uranium at mildly acidic pH and potentially binds iodine-129 (I-129). Use of humate could be applicable for contaminant stabilization at a wide variety of DOE sites however pilot field-scale tests and optimization of this technology are required to move this technical approach frommore » basic science to actual field deployment and regulatory acceptance. The groundwater plume at the F-Area Field Research Site contains a large number of contaminants, the most important from a risk perspective being strontium-90 (Sr-90), uranium isotopes, I-129, tritium, and nitrate. Groundwater remains acidic, with pH as low as 3.2 near the basins and increasing to the background pH of approximately 5at the plume fringes. The field test was conducted in monitoring well FOB 16D, which historically has shown low pH and elevated concentrations of Sr-90, uranium, I-129 and tritium. The field test included three months of baseline monitoring followed by injection of a potassium humate solution and approximately four and half months of post monitoring. Samples were collected and analyzed for numerous constituents but the focus was on attenuation of uranium, Sr-90, and I-129. This report provides background information, methodology, and preliminary field results for a humate field test. Results from the field monitoring show that most of the excess humate (i.e., humate that did not sorb to the sediments) has flushed through the surrounding formation. Furthermore, the data indicate that the test was successful in loading a band of sediment surrounding the injection point to a point where pH could return to near normal during the study timeframe. Future work will involve a final report, which will include data trends, correlations and interpretations of laboratory data.« less

  18. Genome-Wide Associations between Genetic and Epigenetic Variation Influence mRNA Expression and Insulin Secretion in Human Pancreatic Islets

    PubMed Central

    Olsson, Anders H.; Volkov, Petr; Bacos, Karl; Dayeh, Tasnim; Hall, Elin; Nilsson, Emma A.; Ladenvall, Claes; Rönn, Tina; Ling, Charlotte

    2014-01-01

    Genetic and epigenetic mechanisms may interact and together affect biological processes and disease development. However, most previous studies have investigated genetic and epigenetic mechanisms independently, and studies examining their interactions throughout the human genome are lacking. To identify genetic loci that interact with the epigenome, we performed the first genome-wide DNA methylation quantitative trait locus (mQTL) analysis in human pancreatic islets. We related 574,553 single nucleotide polymorphisms (SNPs) with genome-wide DNA methylation data of 468,787 CpG sites targeting 99% of RefSeq genes in islets from 89 donors. We identified 67,438 SNP-CpG pairs in cis, corresponding to 36,783 SNPs (6.4% of tested SNPs) and 11,735 CpG sites (2.5% of tested CpGs), and 2,562 significant SNP-CpG pairs in trans, corresponding to 1,465 SNPs (0.3% of tested SNPs) and 383 CpG sites (0.08% of tested CpGs), showing significant associations after correction for multiple testing. These include reported diabetes loci, e.g. ADCY5, KCNJ11, HLA-DQA1, INS, PDX1 and GRB10. CpGs of significant cis-mQTLs were overrepresented in the gene body and outside of CpG islands. Follow-up analyses further identified mQTLs associated with gene expression and insulin secretion in human islets. Causal inference test (CIT) identified SNP-CpG pairs where DNA methylation in human islets is the potential mediator of the genetic association with gene expression or insulin secretion. Functional analyses further demonstrated that identified candidate genes (GPX7, GSTT1 and SNX19) directly affect key biological processes such as proliferation and apoptosis in pancreatic β-cells. Finally, we found direct correlations between DNA methylation of 22,773 (4.9%) CpGs with mRNA expression of 4,876 genes, where 90% of the correlations were negative when CpGs were located in the region surrounding transcription start site. Our study demonstrates for the first time how genome-wide genetic and epigenetic variation interacts to influence gene expression, islet function and potential diabetes risk in humans. PMID:25375650

  19. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less

  20. Xenogeneic collagen matrix versus connective tissue graft for buccal soft tissue augmentation at implant site. A randomized, controlled clinical trial.

    PubMed

    Cairo, Francesco; Barbato, Luigi; Tonelli, Paolo; Batalocco, Guido; Pagavino, Gabriella; Nieri, Michele

    2017-07-01

    Peri-implant soft tissue may be critical to prevent inflammation and promote gingival margin stability. The purpose of this randomized clinical trial (RCT) is to compare xenogeneic collagen matrix (XCM) versus connective tissue graft (CTG) to increase buccal soft tissue thickness at implant site. Soft tissue augmentation with XCM (test) or CTG (control) was performed at 60 implants in 60 patients at the time of implant uncovering. Measurements were performed by a blinded examiner at baseline, 3 and 6 months. Outcome measures included buccal soft tissue thickness (GT), apico-coronal keratinized tissue (KT), chair time and post-operative discomfort. Visual Analogue Scale (VAS) was used to evaluate patient satisfaction. After 6 months, the final GT increase was 0.9 ± 0.2 in the XCM group and 1.2 ± 0.3 mm in the CTG group, with a significant difference favouring the control group (0.3 mm; p = .0001). Both procedures resulted in similar final KT amount with no significant difference between treatments. XCM was associated with significant less chair-time (p < .0001), less post-operative pain (p < .0001), painkillers intake (p < .0001) and higher final satisfaction than CTG (p = .0195). CTG was more effective than XCM to increase buccal peri-implant soft tissue thickness. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  1. The Geomatics Contribution for the Valorisation Project in the Rocca of San Silvestro Landscape Site

    NASA Astrophysics Data System (ADS)

    Brocchini, D.; Chiabrando, F.; Colucci, E.; Sammartano, G.; Spanò, A.; Teppati Losè, L.; Villa, A.

    2017-05-01

    This paper proposes an emblematic project where several multi-sensor strategies for spatial data acquisition and management, range based and image based, were combined to create a series of integrated territorial and architectural scale products characterized by a rich multi-content nature. The work presented here was finalized in a test site that is composed by an ensemble of diversified cultural deposits; the objects that were surveyed and modelled range from the landscape with its widespread mining sites, the main tower with its defensive role, the urban configuration of the settlement, the building systems and techniques, a medieval mine. For this reason, the Rocca of San Silvestro represented a perfect test case, due to its complex and multi-stratified character. This archaeological site is a medieval fortified village near the municipality of Campiglia Marittima (LI), Italy. The Rocca is part of an Archaeological Mines Park and is included in the Parchi della Val di Cornia (a system of archaeological parks, natural parks and museums in the south-west of Tuscany). The fundamental role of a deep knowledge about a cultural artefact before the planning of a restoration and valorisation project is globally recognized; the qualitative and quantitative knowledge provided by geomatics techniques is part of this process. The paper will present the different techniques that were used, the products that were obtained and will focus on some mapping and WEB GIS applications and analyses that were performed and considerations that were made.

  2. Assessment of solar photocatalysis to purify on-site rinse waters from tractor cisterns used in grapevine pest control: field experimentation.

    PubMed

    Pichat, P; Vannier, S; Dussaud, J; Rubis, J P

    2005-01-01

    The aim of this study was to assess in a vineyard the effect of purifying by solar photocatalysis the title rinse waters (currently most often rejected) in terms of efficacy and on-site practicality for the wine grower. The on-site, self-functioning, solar purifying unit included a corrugated-steel inclined plate of area S = 1 m2 onto which a TiO2-coated thin material had been slightly pressed, a tank, and an aquarium-type pump powered by a photovoltaic panel (appropriate for isolated locations). For a vineyard of area A = 0.15 km2, the rinse water (about 90 L) corresponding to each of four typical vine treatments in summer was analysed (major pesticides for each treatment, TOC, Microtox test and, in one case, BOD5) by independent laboratories, before and after purification for 8 days. The S/A ratio tested was found insufficient even if the photocatalytic treatment markedly improved the quality of the rinse waters. From the relatively low final organic content reached in one case, it is calculated that a three-time higher S/A ratio might suffice, but new trials are necessary to determine whether it is valid for other typical cases. Inferred contribution of inorganic ions to the post-photocatalytic treatment toxicity points to the need for an additional detoxification. These field experiments have also demonstrated that the purifying prototype is robust, and easy to install and use on site by the wine grower.

  3. 10 CFR 2.629 - Finality of partial decision on site suitability issues in a combined license proceeding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2014-01-01 2014-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...

  4. 10 CFR 2.629 - Finality of partial decision on site suitability issues in a combined license proceeding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2013-01-01 2013-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...

  5. Demonstration of a Small Modular BioPower System Using Poultry Litter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John P. Reardon; Art Lilley; Jim Wimberly

    2002-05-22

    The purpose of this project was to assess poultry grower residue, or litter (manure plus absorbent biomass), as a fuel source for Community Power Corporation's small modular biopower system (SMB). A second objective was to assess the poultry industry to identify potential ''on-site'' applications of the SMB system using poultry litter residue as a fuel source, and to adapt CPC's existing SMB to generate electricity and heat from the poultry litter biomass fuel. Bench-scale testing and pilot testing were used to gain design information for the SMB retrofit. System design approach for the Phase II application of the SMB wasmore » the goal of Phase I testing. Cost estimates for an onsite poultry litter SMB were prepared. Finally, a market estimate was prepared for implementation of the on-farm SMB using poultry litter.« less

  6. MANHATTAN: The View From Los Alamos of History's Most Secret Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carr, Alan Brady

    This presentation covers the political and scientific events leading up to the creation of the Manhattan Project. The creation of the Manhattan Project’s three most significant sites--Los Alamos, Oak Ridge, and Hanford--is also discussed. The lecture concludes by exploring the use of the atomic bombs at the end of World War II. The presentation slides include three videos. The first is a short clip of the 100-ton Test. The 100-Ton Test was history’s largest measured blast at that point in time; it was a pre-test for Trinity, the world’s first nuclear detonation. The second clip features views of Trinity followedmore » a short statement by the Laboratory’s first director, J. Robert Oppenheimer. The final clip shows Norris Bradbury talking about arms control.« less

  7. Polyadenylation site prediction using PolyA-iEP method.

    PubMed

    Kavakiotis, Ioannis; Tzanis, George; Vlahavas, Ioannis

    2014-01-01

    This chapter presents a method called PolyA-iEP that has been developed for the prediction of polyadenylation sites. More precisely, PolyA-iEP is a method that recognizes mRNA 3'ends which contain polyadenylation sites. It is a modular system which consists of two main components. The first exploits the advantages of emerging patterns and the second is a distance-based scoring method. The outputs of the two components are finally combined by a classifier. The final results reach very high scores of sensitivity and specificity.

  8. Knowledge-based systems in Japan

    NASA Technical Reports Server (NTRS)

    Feigenbaum, Edward; Engelmore, Robert S.; Friedland, Peter E.; Johnson, Bruce B.; Nii, H. Penny; Schorr, Herbert; Shrobe, Howard

    1994-01-01

    This report summarizes a study of the state-of-the-art in knowledge-based systems technology in Japan, organized by the Japanese Technology Evaluation Center (JTEC) under the sponsorship of the National Science Foundation and the Advanced Research Projects Agency. The panel visited 19 Japanese sites in March 1992. Based on these site visits plus other interactions with Japanese organizations, both before and after the site visits, the panel prepared a draft final report. JTEC sent the draft to the host organizations for their review. The final report was published in May 1993.

  9. Human papillomavirus-32-associated focal epithelial hyperplasia accompanying HPV-16-positive papilloma-like lesions in oral mucosa.

    PubMed

    Liu, Na; Wang, Jiayi; Lei, Lei; Li, Yanzhong; Zhou, Min; Dan, Hongxia; Zeng, Xin; Chen, Qianming

    2013-05-01

    Human papillomavirus infection can cause a variety of benign or malignant oral lesions, and the various genotypes can cause distinct types of lesions. To our best knowledge, there has been no report of 2 different human papillomavirus-related oral lesions in different oral sites in the same patient before. This paper reported a patient with 2 different oral lesions which were clinically and histologically in accord with focal epithelial hyperplasia and oral papilloma, respectively. Using DNA extracted from these 2 different lesions, tissue blocks were tested for presence of human papillomavirus followed by specific polymerase chain reaction testing for 6, 11, 13, 16, 18, and 32 subtypes in order to confirm the clinical diagnosis. Finally, human papillomavirus-32-positive focal epithelial hyperplasia accompanying human papillomavirus-16-positive oral papilloma-like lesions were detected in different sites of the oral mucosa. Nucleotide sequence sequencing further confirmed the results. So in our clinical work, if the simultaneous occurrences of different human papillomavirus associated lesions are suspected, the multiple biopsies from different lesions and detection of human papillomavirus genotype are needed to confirm the diagnosis.

  10. GPR studies at the Nuvuk burial site at Point Barrow, Alaska

    NASA Astrophysics Data System (ADS)

    Herman, R. B.; Palmer, J.

    2011-12-01

    Ground penetrating radar was used to study a portion of the Nuvuk (Thule people) prehistoric burial site and to search for a buried prehistoric strand line at Point Barrow. GPR operating at 500MHz resolved features up to 2.5m deep in this area and were used to aid in search and recovery efforts. These scans imaged areas of recent disturbance that required shovel testing to confirm the lack of burials. This survey was able to rule out burials in several areas. Scans determined at least one area where a burial was found that would have been too deep for normal shovel tests to detect. A nearby area was scanned to trace the path of a prehistoric strand line whose initial presence had been revealed by exposure on the bluff adjacent to the Beaufort Sea. The GPR data revealed the path of that strand line along with a number of others. Final GPR images and GPS maps of the survey areas and the strand lines will be presented. The results of follow-up excavations will be discussed, along with the GPR parameters that gave the best results.

  11. Equipment for fully homologous bulb turbine model testing in Laval University

    NASA Astrophysics Data System (ADS)

    R, Fraser; D, Vallée; Y, Jean; C, Deschênes

    2014-03-01

    Within the context of liberalisation of the energy market, hydroelectricity remains a first class source of clean and renewable energy. Combining the growing demand of energy, its increasing value and the appreciation associated to the sustainable development, low head sites formerly considered as non-profitable are now exploitable. Bulb turbines likely to equip such sites are traditionally developed on model using right angle transmission leading to piers enlargement for power take off shaft passage, thus restricting possibilities to have fully homologous hydraulic passages. Aiming to sustain good quality development on fully homologous scale model of bulb turbines, the Hydraulic Machines Laboratory (LAMH) of Laval University has developed a brake with an enhanced power to weight ratio. This powerful brake is small enough to be located in the bulb shell while dissipating power without mandatory test head reduction. This paper first presents the basic technology of this brake and its application. Then both its main performance capabilities and dimensional characteristics will be detailed. The instrumentation used to perform accurate measurements will be finally presented.

  12. Disposal site quality team final report

    DOT National Transportation Integrated Search

    2001-09-01

    The disposal site quality team was formed in July 2000 to address Caltrans (Department) and Federal Highway Administration (FHWA) policies on disposal, staging, and borrow areas (DSB), including plant sites, contractor yards, and access roads. Caltra...

  13. Selection of Atmospheric Environmental Monitoring Sites based on Geographic Parameters Extraction of GIS and Fuzzy Matter-Element Analysis.

    PubMed

    Wu, Jianfa; Peng, Dahao; Ma, Jianhao; Zhao, Li; Sun, Ce; Ling, Huanzhang

    2015-01-01

    To effectively monitor the atmospheric quality of small-scale areas, it is necessary to optimize the locations of the monitoring sites. This study combined geographic parameters extraction by GIS with fuzzy matter-element analysis. Geographic coordinates were extracted by GIS and transformed into rectangular coordinates. These coordinates were input into the Gaussian plume model to calculate the pollutant concentration at each site. Fuzzy matter-element analysis, which is used to solve incompatible problems, was used to select the locations of sites. The matter element matrices were established according to the concentration parameters. The comprehensive correlation functions KA (xj) and KB (xj), which reflect the degree of correlation among monitoring indices, were solved for each site, and a scatter diagram of the sites was drawn to determine the final positions of the sites based on the functions. The sites could be classified and ultimately selected by the scatter diagram. An actual case was tested, and the results showed that 5 positions can be used for monitoring, and the locations conformed to the technical standard. In the results of this paper, the hierarchical clustering method was used to improve the methods. The sites were classified into 5 types, and 7 locations were selected. Five of the 7 locations were completely identical to the sites determined by fuzzy matter-element analysis. The selections according to these two methods are similar, and these methods can be used in combination. In contrast to traditional methods, this study monitors the isolated point pollutant source within a small range, which can reduce the cost of monitoring.

  14. A New Approach to Standardize Multicenter Studies: Mobile Lab Technology for the German Environmental Specimen Bank

    PubMed Central

    Lermen, Dominik; Schmitt, Daniel; Bartel-Steinbach, Martina; Schröter-Kermani, Christa; Kolossa-Gehring, Marike; von Briesen, Hagen; Zimmermann, Heiko

    2014-01-01

    Technical progress has simplified tasks in lab diagnosis and improved quality of test results. Errors occurring during the pre-analytical phase have more negative impact on the quality of test results than errors encountered during the total analytical process. Different infrastructures of sampling sites can highly influence the quality of samples and therewith of analytical results. Annually the German Environmental Specimen Bank (ESB) collects, characterizes, and stores blood, plasma, and urine samples of 120–150 volunteers each on four different sampling sites in Germany. Overarching goal is to investigate the exposure to environmental pollutants of non-occupational exposed young adults combining human biomonitoring with questionnaire data. We investigated the requirements of the study and the possibility to realize a highly standardized sampling procedure on a mobile platform in order to increase the required quality of the pre-analytical phase. The results lead to the development of a mobile epidemiologic laboratory (epiLab) in the project “Labor der Zukunft” (future’s lab technology). This laboratory includes a 14.7 m2 reception area to record medical history and exposure-relevant behavior, a 21.1 m2 examination room to record dental fillings and for blood withdrawal, a 15.5 m2 biological safety level 2 laboratory to process and analyze samples on site including a 2.8 m2 personnel lock and a 3.6 m2 cryofacility to immediately freeze samples. Frozen samples can be transferred to their final destination within the vehicle without breaking the cold chain. To our knowledge, we herewith describe for the first time the implementation of a biological safety laboratory (BSL) 2 lab and an epidemiologic unit on a single mobile platform. Since 2013 we have been collecting up to 15.000 individual human samples annually under highly standardized conditions using the mobile laboratory. Characterized and free of alterations they are kept ready for retrospective analyses in their final archive, the German ESB. PMID:25141120

  15. A new approach to standardize multicenter studies: mobile lab technology for the German Environmental Specimen Bank.

    PubMed

    Lermen, Dominik; Schmitt, Daniel; Bartel-Steinbach, Martina; Schröter-Kermani, Christa; Kolossa-Gehring, Marike; von Briesen, Hagen; Zimmermann, Heiko

    2014-01-01

    Technical progress has simplified tasks in lab diagnosis and improved quality of test results. Errors occurring during the pre-analytical phase have more negative impact on the quality of test results than errors encountered during the total analytical process. Different infrastructures of sampling sites can highly influence the quality of samples and therewith of analytical results. Annually the German Environmental Specimen Bank (ESB) collects, characterizes, and stores blood, plasma, and urine samples of 120-150 volunteers each on four different sampling sites in Germany. Overarching goal is to investigate the exposure to environmental pollutants of non-occupational exposed young adults combining human biomonitoring with questionnaire data. We investigated the requirements of the study and the possibility to realize a highly standardized sampling procedure on a mobile platform in order to increase the required quality of the pre-analytical phase. The results lead to the development of a mobile epidemiologic laboratory (epiLab) in the project "Labor der Zukunft" (future's lab technology). This laboratory includes a 14.7 m(2) reception area to record medical history and exposure-relevant behavior, a 21.1 m(2) examination room to record dental fillings and for blood withdrawal, a 15.5 m(2) biological safety level 2 laboratory to process and analyze samples on site including a 2.8 m(2) personnel lock and a 3.6 m2 cryofacility to immediately freeze samples. Frozen samples can be transferred to their final destination within the vehicle without breaking the cold chain. To our knowledge, we herewith describe for the first time the implementation of a biological safety laboratory (BSL) 2 lab and an epidemiologic unit on a single mobile platform. Since 2013 we have been collecting up to 15.000 individual human samples annually under highly standardized conditions using the mobile laboratory. Characterized and free of alterations they are kept ready for retrospective analyses in their final archive, the German ESB.

  16. Near surface geotechnical and geophysical data cross validated for site characterization applications. The cases of selected accelerometric stations in Crete island (Greece)

    NASA Astrophysics Data System (ADS)

    Loupasakis, Constantinos; Tsangaratos, Paraskevas; Rozos, Dimitrios; Rondoyianni, Theodora; Vafidis, Antonis; Steiakakis, Emanouil; Agioutantis, Zacharias; Savvaidis, Alexandros; Soupios, Pantelis; Papadopoulos, Ioannis; Papadopoulos, Nikos; Sarris, Apostolos; Mangriotis, Maria-Dafni; Dikmen, Unal

    2015-04-01

    The near surface ground conditions are highly important for the design of civil constructions. These conditions determine primarily the ability of the foundation formations to bear loads, the stress - strain relations and the corresponding deformations, as well as the soil amplification and corresponding peak ground motion in case of dynamic loading. The static and dynamic geotechnical parameters as well as the ground-type/soil-category can be determined by combining geotechnical and geophysical methods, such as engineering geological surface mapping, geotechnical drilling, in situ and laboratory testing and geophysical investigations. The above mentioned methods were combined for the site characterization in selected sites of the Hellenic Accelerometric Network (HAN) in the area of Crete Island. The combination of the geotechnical and geophysical methods in thirteen (13) sites provided sufficient information about their limitations, setting up the minimum tests requirements in relation to the type of the geological formations. The reduced accuracy of the surface mapping in urban sites, the uncertainties introduced by the geophysical survey in sites with complex geology and the 1-D data provided by the geotechnical drills are some of the causes affecting the right order and the quantity of the necessary investigation methods. Through this study the gradual improvement on the accuracy of the site characterization data in regards to the applied investigation techniques is presented by providing characteristic examples from the total number of thirteen sites. As an example of the gradual improvement of the knowledge about the ground conditions the case of AGN1 strong motion station, located at Agios Nikolaos city (Eastern Crete), is briefly presented. According to the medium scale geological map of IGME the station was supposed to be founded over limestone. The detailed geological mapping reveled that a few meters of loose alluvial deposits occupy the area, expected to lay over the Neogene marly formations and the Mesozoic limestone, identified at the surrounding area. This changes the ground type to E instead of A, based on the EC8 classification. According the geophysical survey the Neogene formations extend down several meters and the mean Vs30 is 476m/s, increasing the rank of the ground type to B. Finally, the geotechnical drill reviled that the loose alluvial deposits extend down 13m containing two clearly identified layers of liquefiable loose sand. Below the alluvial deposits a thin layer (1,5m thick) of Neogene marly formations and the karstified limestone was located, as expected. So finally it was proved that the ground type category at the site is S2, setting up the geotechnical drills as the determinant investigation technique for this site. Besides the above described case, all selected examples present sufficiently the ability, the limitations and the right order of the investigation methods aiming to the site characterization. This research has been co-financed by the European Union (European Social Fund - ESF) and Greek national funds through the Operational Program "Education and Lifelong Learning" of the National Strategic Reference Framework (NSRF) - Research Funding Program: THALES. Investing in knowledge society through the European Social Fund.

  17. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Poderis, Reed J.; King, Rebecca A.

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping,more » tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400« less

  18. 75 FR 65558 - Final Supplemental Environmental Impact Statement, Single Nuclear Unit at the Bellefonte Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... TENNESSEE VALLEY AUTHORITY Final Supplemental Environmental Impact Statement, Single Nuclear Unit... Environmental Impact Statement for a Single Nuclear Unit at the Bellefonte Plant Site (final SEIS) on September... the ROD. TVA prepared the final SEIS to update the extensive environmental information and analyses...

  19. SELECTION AND TREATMENT OF STRIPPER GAS WELLS FOR PRODUCTION ENHANCEMENT IN THE MID-CONTINENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott Reeves

    2003-03-01

    Stripper gas wells are an important source of domestic energy supply and under constant threat of permanent loss (shut-in) due to marginal economics. In 1998, 192 thousand stripper gas wells produced over a Tcf of gas, at an average rate of less than 16 Mcfd. This represents about 57% of all producing gas wells in the onshore lower-48 states, yet only 8% of production. Reserves of stripper gas wells are estimated to be only 1.6 Tcf, or slightly over 1% of the onshore lower-48 total (end of year 1996 data). Obviously, stripper gas wells are at the very margin ofmore » economic sustenance. As the demand for natural gas in the U.S. grows to the forecasted estimate of over 30 Tcf annually by the year 2010, supply from current conventional sources is expected to decline. Therefore, an important need exists to fully exploit known domestic resources of natural gas, including those represented by stripper gas wells. The overall objectives of this project are to develop an efficient and low-cost methodology to broadly categorize the well performance characteristics for a stripper gas field, identify the high-potential candidate wells for remediation, and diagnose the specific causes for well underperformance. With this capability, stripper gas well operators can more efficiently and economically produce these resources and maximize these gas reserves. A further objective is to identify/develop, evaluate and test ''new and novel,'' economically viable remediation options. Finally, it is the objective of this project that all the methods and technologies developed in this project, while being tested in the Mid-Continent, be widely applicable to stripper gas wells of all types across the country. The project activities during the reporting period were: (1) Continued to solicit industry research partners to provide test sites. A Cooperative Research Agreement has been signed with Oneok, for a test site in the Mocane-Laverne field in the Anadarko basin (Oklahoma). The site consists of about 150 wells producing primarily from the Morrow, but also the Chester, Hoover, and Tonkawa. The Morrow is the second largest gas play in the Anadarko basin (next to Hugoton), and the Mocane-Laverne field in the largest Morrow field, so any new methods developed at this site will have broad application throughout the Mid-Continent Morrow play (which has tens of thousands of wells). (2) Discussions are also ongoing with EOG Resources and Patina Oil and Gas to obtain test sites. In these cases, however, the sites are in the Rocky Mountains. The difficulty being encountered in securing Mid-Continent test sites has forced us to expand the geographic scope of our search. (3) Data collection for the Mocane-Laverne site has recently begun, and will be completed soon. At that time the various analyses will be performed to identify enhancement potential.« less

  20. Superfund Record of Decision (EPA Region 5): Novaco Industries, MI. (First remedial action), (Amendment), September 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 2.6-acre Novaco Industries site is a one building site in Temperance, Michigan. Land use in the area is predominantly residential and agricultural. The estimated 85 residences located within 1/2 mile of the site use the underlying sand/gravel and limestone aquifer as their drinking water supply. A 1986 Record of Decision (ROD) addressed a final remedy for ground water contamination and provided for ground water pumping and treatment using electrochemical reduction/ion exchange polishing, followed by onsite discharge to surface water. The ROD amends the 1986 ROD. The amended remedial action for the site is no further action.

  1. Report of the Peer Review Panel on the early site suitability evaluation of the Potential Repository Site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-01-01

    The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of seniormore » YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.« less

  2. Final Report: Technical Assistance for the Kearsarge Metallurgical Corporation Superfund Site, Conway, New Hampshire, EPA Region 1

    EPA Pesticide Factsheets

    This report reviews and provides recommendations for a long-term groundwater monitoring network for the Kearsarge Metallurgical Corporation Superfund site (KMC site). The KMC site is a former foundry and metal fabrication facility in Conway, New Hampshire.

  3. Utilization of 3D imaging flash lidar technology for autonomous safe landing on planetary bodies

    NASA Astrophysics Data System (ADS)

    Amzajerdian, Farzin; Vanek, Michael; Petway, Larry; Pierrottet, Diego; Busch, George; Bulyshev, Alexander

    2010-01-01

    NASA considers Flash Lidar a critical technology for enabling autonomous safe landing of future large robotic and crewed vehicles on the surface of the Moon and Mars. Flash Lidar can generate 3-Dimensional images of the terrain to identify hazardous features such as craters, rocks, and steep slopes during the final stages of descent and landing. The onboard flight comptuer can use the 3-D map of terain to guide the vehicle to a safe site. The capabilities of Flash Lidar technology were evaluated through a series of static tests using a calibrated target and through dynamic tests aboard a helicopter and a fixed wing airctarft. The aircraft flight tests were perfomed over Moonlike terrain in the California and Nevada deserts. This paper briefly describes the Flash Lidar static and aircraft flight test results. These test results are analyzed against the landing application requirements to identify the areas of technology improvement. The ongoing technology advancement activities are then explained and their goals are described.

  4. Utilization of 3-D Imaging Flash Lidar Technology for Autonomous Safe Landing on Planetary Bodies

    NASA Technical Reports Server (NTRS)

    Amzajerdian, Farzin; Vanek, Michael; Petway, Larry; Pierrotter, Diego; Busch, George; Bulyshev, Alexander

    2010-01-01

    NASA considers Flash Lidar a critical technology for enabling autonomous safe landing of future large robotic and crewed vehicles on the surface of the Moon and Mars. Flash Lidar can generate 3-Dimensional images of the terrain to identify hazardous features such as craters, rocks, and steep slopes during the final stages of descent and landing. The onboard flight computer can use the 3-D map of terrain to guide the vehicle to a safe site. The capabilities of Flash Lidar technology were evaluated through a series of static tests using a calibrated target and through dynamic tests aboard a helicopter and a fixed wing aircraft. The aircraft flight tests were performed over Moon-like terrain in the California and Nevada deserts. This paper briefly describes the Flash Lidar static and aircraft flight test results. These test results are analyzed against the landing application requirements to identify the areas of technology improvement. The ongoing technology advancement activities are then explained and their goals are described.

  5. Endobronchial ultrasound-guided transbronchial needle aspiration: performance of biomedical scientists on rapid on-site evaluation and preliminary diagnosis.

    PubMed

    Schacht, M J; Toustrup, C B; Madsen, L B; Martiny, M S; Larsen, B B; Simonsen, J T

    2016-10-01

    Rapid on-site evaluation (ROSE) of endobronchial ultrasound-guided transbronchial needle aspiration (EBUS-TBNA) followed by a subsequent preliminary adequacy assessment and a preliminary diagnosis, was performed at Aarhus University Hospital by biomedical scientists (BMS). The aim of this study was to evaluate the BMS accuracy of ROSE adequacy assessment, the preliminary adequacy assessment and the preliminary diagnosis as compared with the cytopathologist-rendered final adequacy assessment and final diagnosis. The BMS-rendered assessments for 717 sites from 319 consecutive patients over a 4-month period were compared with the cytopathologist-rendered assessments. Comparisons of adequacy and preliminary diagnoses were based on inter-observer Cohen's Kappa coefficient with a 95% confidence interval (CI). Strong correlations between ROSE and final adequacy assessments [Kappa coefficient of 0.90 (CI: 0.85-0.96)] and between the preliminary and final adequacy assessments [Kappa coefficient of 0.93 (CI: 0.87-0.99)] were found. As for the correlation between the preliminary and final diagnoses, the Kappa coefficient was 0.99 (CI: 0.98-1). Both ROSE and preliminary adequacy assessments as well as preliminary diagnoses, all performed by BMS, were highly accurate when compared with the final assessment by the cytopathologist. © 2016 John Wiley & Sons Ltd.

  6. Prototype Engineered Barrier System Field Test (PEBSFT); Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramirez, A.L.; Buscheck, T.; Carlson, R.

    1991-08-01

    This final report represents a summary of data and interpretations obtained from the Prototype Engineered Barrier System Field Test (PEBSFT) performed in G-Tunnel within the Nevada Test Site. The PEBSFT was conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for future field tests that will be conducted in the Exploratory Studies Facilities (ESF) at Yucca Mountain. The primary objective of the test was to provide a basis for determining whether tests planned for the ESF have the potential to be successful. Chapter 1 on high frequency electromagnetic tomography discusses the rock mass electromagnetic permittivity andmore » attenuation rate changes that were measured to characterize the water distribution in the near field of a simulated waste container. The data are used to obtain quantitative estimates of how the moisture content in the rock mass changes during heating and to infer properties of the spatial variability of water distribution, leading to conclusions about the role of fractures in the system. Chapter 2 discusses the changes in rock moisture content detected by the neutron logging probe. Chapter 3 permeability tests discusses the characterization of the in-situ permeability of the fractured tuff around the borehole. The air permeability testing apparatus, the testing procedures, and the data analysis are presented. Chapter 4 describes the moisture collection system installed in the heater borehole to trap and measure the moisture volumes. Chapter 5 describes relative humidity measurements made with the thermocouple psychrometer and capacitance sensors. Chapter 6 discusses gas pressure measurements in the G-Tunnel, addressing the calibration and installation of piezoresistive-gaged transducers. Chapter 7 describes the calibration and installation of thermocouples for temperature measurements. Chapter 8 discusses the results of the PEBSFT.« less

  7. The Ricor K508 cryocooler operational experience on Mars

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Dean L.; Lysek, Mark J.; Morookian, John Michael

    The Mars Science Laboratory (Curiosity) landed successfully on Mars on August 5, 2012, eight months after launch. The chosen landing site of Gale Crater, located at 4.5 degrees south latitude, 137.4 degrees east longitude, has provided a much more benign environment than was originally planned for during the critical design and integration phases of the MSL Project when all possible landing sites were still being considered. The expected near-surface atmospheric temperatures at the Gale Crater landing site during Curiosity's primary mission (1 Martian year or 687 Earth days) are from −90°C to 0°C. However, enclosed within Curiosity's thermal control fluidmore » loops the Chemistry and Mineralogy (CheMin) instrument is maintained at approximately +20°C. The CheMin instrument uses X-ray diffraction spectroscopy to make precise measurements of mineral constituents of Mars rocks and soil. The instrument incorporated the commercially available Ricor K508 Stirling cycle cryocooler to cool the CCD detector. After several months of brushing itself off, stretching and testing out its subsystems, Curiosity began the exploration of the Mars surface in October 2012. The CheMin instrument on the Mars Science Laboratory (MSL) received its first soil sample from Curiosity on October 24, and successfully analyzed its first soil sample. After a brief review of the rigorous Ricor K508 cooler qualification tests and life tests based on the original MSL environmental requirements this paper presents final pre-launch instrument integration and testing results, and details the operational data of the CheMin cryocooler, providing a snapshot of the resulting CheMin instrument analytical data.« less

  8. Age-Related Differences in Socio-demographic and Behavioral Determinants of HIV Testing and Counseling in HPTN 043/NIMH Project Accept.

    PubMed

    Salazar-Austin, N; Kulich, M; Chingono, A; Chariyalertsak, S; Srithanaviboonchai, K; Gray, G; Richter, L; van Rooyen, H; Morin, S; Sweat, M; Mbwambo, J; Szekeres, G; Coates, T; Celentano, D

    2018-02-01

    Youth represent a large proportion of new HIV infections worldwide, yet their utilization of HIV testing and counseling (HTC) remains low. Using the post-intervention, cross-sectional, population-based household survey done in 2011 as part of HPTN 043/NIMH Project Accept, a cluster-randomized trial of community mobilization and mobile HTC in South Africa (Soweto and KwaZulu Natal), Zimbabwe, Tanzania and Thailand, we evaluated age-related differences among socio-demographic and behavioral determinants of HTC in study participants by study arm, site, and gender. A multivariate logistic regression model was developed using complete individual data from 13,755 participants with recent HIV testing (prior 12 months) as the outcome. Youth (18-24 years) was not predictive of recent HTC, except for high-risk youth with multiple concurrent partners, who were less likely (aOR 0.75; 95% CI 0.61-0.92) to have recently been tested than youth reporting a single partner. Importantly, the intervention was successful in reaching men with site specific success ranging from aOR 1.27 (95% CI 1.05-1.53) in South Africa to aOR 2.30 in Thailand (95% CI 1.85-2.84). Finally, across a diverse range of settings, higher education (aOR 1.67; 95% CI 1.42, 1.96), higher socio-economic status (aOR 1.21; 95% CI 1.08-1.36), and marriage (aOR 1.55; 95% CI 1.37-1.75) were all predictive of recent HTC, which did not significantly vary across study arm, site, gender or age category (18-24 vs. 25-32 years).

  9. 'Test n Treat (TnT)': a cluster-randomised feasibility trial of frequent, rapid-testing and same-day, on-site treatment to reduce rates of chlamydia in high-risk further education college students: statistical analysis plan.

    PubMed

    Phillips, Rachel; Oakeshott, Pippa; Kerry-Barnard, Sarah; Reid, Fiona

    2018-06-05

    There are high rates of sexually transmitted infections (STIs) in ethnically diverse, sexually active students aged 16-24 years attending London further education (FE) colleges. However, uptake of chlamydia screening remains low. The TnT study aims to assess the feasibility of conducting a future trial in FE colleges to investigate if frequent, rapid, on-site testing and treatment (TnT) reduces chlamydia rates. This article presents the statistical analysis plan for the main study publication as approved and signed off by the Trial Management Group prior to the first data extraction for the final report. TnT is a cluster-randomised feasibility trial conducted over 7 months with parallel qualitative and economic assessments. Colleges will be randomly allocated into the intervention (TnT) or the control group (no TnT). Six FE colleges in London will be included. At each college for 2 days, 80 consecutive sexually active students aged 16-24 years (total 480 students across all six colleges) will be recruited from public areas and asked to provide baseline samples. One and 4 months after recruitment intervention colleges will be visited on two consecutive days by the TnT team where participating students will be texted and invited to come for same-day, on-site, rapid chlamydia testing and, if positive, treatment. Participants in the control colleges will receive 'thank you' texts 1 and 4 months after recruitment. Seven months after recruitment, participants from both groups will be invited to complete questionnaires and provide samples for TnT. All samples will be tested, and same-day treatment offered to participants with positive results. Key feasibility outcomes include: recruitment rates, testing and treatment uptake rates (at 1 and 4 months) and follow-up rates (at 7 months). ISRCTN 58038795 . Registered on 31 August 2016.

  10. Site-conditions map for Portugal based on VS measurements: methodology and final model

    NASA Astrophysics Data System (ADS)

    Vilanova, Susana; Narciso, João; Carvalho, João; Lopes, Isabel; Quinta Ferreira, Mario; Moura, Rui; Borges, José; Nemser, Eliza; Pinto, carlos

    2017-04-01

    In this paper we present a statistically significant site-condition model for Portugal based on shear-wave velocity (VS) data and surface geology. We also evaluate the performance of commonly used Vs30 proxies based on exogenous data and analyze the implications of using those proxies for calculating site amplification in seismic hazard assessment. The dataset contains 161 Vs profiles acquired in Portugal in the context of research projects, technical reports, academic thesis and academic papers. The methodologies involved in characterizing the Vs structure at the sites in the database include seismic refraction, multichannel analysis of seismic waves and refraction microtremor. Invasive measurements were performed in selected locations in order to compare the Vs profiles obtained from both invasive and non-invasive techniques. In general there was good agreement in the subsurface structure of Vs30 obtained from the different methodologies. The database flat-file includes information on Vs30, surface geology at 1:50.000 and 1:500.000 scales, elevation and topographic slope and based on SRTM30 topographic dataset. The procedure used to develop the site-conditions map is based on a three-step process that includes defining a preliminary set of geological units based on the literature, performing statistical tests to assess whether or not the differences in the distributions of Vs30 are statistically significant, and merging of the geological units accordingly. The dataset was, to some extent, affected by clustering and/or preferential sampling and therefore a declustering algorithm was applied. The final model includes three geological units: 1) Igneous, metamorphic and old (Paleogene and Mesozoic) sedimentary rocks; 2) Neogene and Pleistocene formations, and 3) Holocene formations. The evaluation of proxies indicates that although geological analogues and topographic slope are in general unbiased, the latter shows significant bias for particular geological units and subsequently for some geographical regions.

  11. Thermoregulatory behavior of bluegill, Lepomis macrochirus from a thermally stressed ecosystem. [Lepomis macrochirus

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fischer, R.U. Jr.

    1984-12-01

    Bluegills, Lepomis macrochirus were used as a representative aquatic ectotherm to determine the importance of behavior in thermoregulation of fish inhabiting a thermally stressed ecosystem. In the first part of the study, the mean final temperature preferenda for small bluegills from the heated and normothermic sites (25.2/sup 0/C vs 25.0/sup 0/C) were not significantly different. In the second part of the study, the acute preferred temperatures of large L. macrochirus (anti X = 26.3/sup 0/C) showed a statistically significant difference from that of small bluegills (anti X = 25.2/sup 0/C). There was no significant difference in the acute preferred temperaturesmore » for bluegill from the heated and normothermic sites. In the last phase of the study L. macrochirus from both a thermally stressed and normothermic site were tested for upper avoidance temperature in the absence of and in the presence of two sizes of predators (Micropterus salmoides, largemouth bass). In the absence of a predator the small bluegill had a mean upper avoidance temperature of 30.0/sup 0/C as compared to 29.8/sup 0/C for the large bluegills. In the presence of a small and large predator the small bluegills had a mean upper avoidance temperature of 34.0/sup 0/C and 33.9/sup 0/C respectively, while the large bluegills had mean upper avoidance temperatures of 33.8/sup 0/C and 33.1/sup 0/C. In the presence of a predator bluegill upper avoidance temperatures were significantly higher, however, predator size did not influence this relationship. During the determinations of final temperature preferendum, acute preferred temperature, and upper avoidance temperature, the fish from the heated site always exhibited less variability in temperature measurements than those from the control site. 41 refs., 9 figs., 10 tabs.« less

  12. 75 FR 26131 - National Oil and Hazardous Substance Pollution Contingency Plan; National Priorities List

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... publishing a direct final Notice of Deletion of the Asbestos Dump Superfund Site (Site), located in Long Hill... Deletion of the Asbestos Dump Superfund site (Site), from the National Priorities List (NPL). The NPL... discusses the Asbestos Dump Superfund Site and demonstrates how it meets the deletion criteria. Section V...

  13. Field studies of beach cones as coastal erosion control/reversal devices for areas with significant oil and gas activities. Technical progress report, April--June 1992 and Project status report, June 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-17

    A field demonstration/study of a novel shoreline erosion protection device called beach cones is planned. These patented, fiberglass- reinforced concreted devices are to be deployed in a number of geometric patterns at seven location in the Bastian Bay area of Western Plaquemines Parish. The purpose of the work described in this report was to evaluate the proposed study`s impact on living and non-living shellfish resources within each of the project`s seven separate Study Areas. Major accomplishments for this reporting period were as follows: aerial photographs of the experimental sites were taken; all permit applications were filed; information was submitted formore » the Environmental Report; several reconnaissance trips to the experimental sites were made; meetings were held among all participating organizations to further plan the research; permit was obtained from the US Army Corps of Engineers; test sites were surveyed by the Xavier University contingent; survey data were taken at all sites; the Oyster Assessment was completed; permit was obtained from the State of Louisiana Department of Natural Resources; and initial survey data were finalized at all sites.« less

  14. Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Amchitka, Alaska, Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2008-09-01

    This Long-Term Surveillance and Maintenance Plan describes how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at the Amchitka, Alaska, Site1. Three underground nuclear tests were conducted on Amchitka Island. The U.S. Department of Defense, in conjunction with the U.S. Atomic Energy Commission (AEC), conducted the first nuclear test (Long Shot) to provide data that would improve the United States' capability of detecting underground nuclear explosions. The second nuclear test (Milrow) was a weapons-related test conducted by AEC as a means to study the feasibility of detonating amore » much larger device. The final nuclear test (Cannikin), the largest United States underground test, was a weapons-related test. Surface disturbances associated with these tests have been remediated. However, radioactivity remains deep below the surface, contained in and around the test cavities, for which no feasible remediation technology has been identified. In 2006, the groundwater model (Hassan et al. 2002) was updated using 2005 data collected by the Consortium for Risk Evaluation with Stakeholder Participation. Model simulation results indicate there is no breakthrough or seepage of radionuclides into the marine environment within 2,000 years. The Amchitka conceptual model is reasonable; the flow and transport simulation is based on the best available information and data. The simulation results are a quantitative prediction supported by the best available science and technology. This Long-Term Surveillance and Maintenance Plan is an additional step intended for the protection of human health and the environment. This plan may be modified from time to time in the future consistent with the mission to protect human health« less

  15. Human Health and Ecological Risk Assessment for the Operation of the Explosives Waste Treatment Facility at Site 300 of the Lawrence Livermore National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallegos, G; Daniels, J; Wegrecki, A

    2007-10-01

    This document contains the human health and ecological risk assessment for the Resource Recovery and Conservation Act (RCRA) permit renewal for the Explosives Waste Treatment Facility (EWTF). Volume 1 is the text of the risk assessment, and Volume 2 (provided on a compact disc) is the supporting modeling data. The EWTF is operated by the Lawrence Livermore National Laboratory (LLNL) at Site 300, which is located in the foothills between the cities of Livermore and Tracy, approximately 17 miles east of Livermore and 8 miles southwest of Tracy. Figure 1 is a map of the San Francisco Bay Area, showingmore » the location of Site 300 and other points of reference. One of the principal activities of Site 300 is to test what are known as 'high explosives' for nuclear weapons. These are the highly energetic materials that provide the force to drive fissionable material to criticality. LLNL scientists develop and test the explosives and the integrated non-nuclear components in support of the United States nuclear stockpile stewardship program as well as in support of conventional weapons and the aircraft, mining, oil exploration, and construction industries. Many Site 300 facilities are used in support of high explosives research. Some facilities are used in the chemical formulation of explosives; others are locations where explosive charges are mechanically pressed; others are locations where the materials are inspected radiographically for such defects as cracks and voids. Finally, some facilities are locations where the machined charges are assembled before they are sent to the onsite test firing facilities, and additional facilities are locations where materials are stored. Wastes generated from high-explosives research are treated by open burning (OB) and open detonation (OD). OB and OD treatments are necessary because they are the safest methods for treating explosives wastes generated at these facilities, and they eliminate the requirement for further handling and transportation that would be required if the wastes were treated off site.« less

  16. Beyond the Ivory Tower: A Comparison of Grades Across Academic and Community OB/GYN Clerkship Sites.

    PubMed

    Fay, Emily E; Schiff, Melissa A; Mendiratta, Vicki; Benedetti, Thomas J; Debiec, Kate

    2016-01-01

    CONSTRUCT: Decentralized clinical education is the use of community facilities and community physicians to educate medical students. The theory behind decentralized clinical education is that academic and community sites will provide educational equivalency as determined by objective and subjective performance measures, while training more medical students and exposing students to rural or underserved communities. One of the major challenges of decentralized clinical education is ensuring site comparability in both learning opportunities and evaluation of students. Previous research has examined objective measures of student performance, but less is known about subjective performance measures, particularly in the field of obstetrics and gynecology (OB/GYN). This study explores the implications of clinical site on the adequacy of subjective and objective performance measures. This was a retrospective cohort study of 801 students in the University of Washington School of Medicine OB/GYN clerkship from 2008 to 2012. Academic sites included those with OB/GYN residency programs (n = 2) and community sites included those without residency programs (n = 29). The association between clerkship site and National Board of Medical Examiners (NBME) grade was assessed using linear regression and clinical and final grade using multinomial regression, estimating β coefficient and relative risks (RR), respectively, and 95% confidence intervals (CIs), adjusting for gender, academic quarter of clerkship, and year of clerkship. There were no differences in NBME exam grades of students at academic sites (76.4 (7.3) versus 74.6 (8.0), β = -0.11, 95% CI [1.35, 1.12] compared to community sites. For clinical grade, students at community sites were 2.4 times more likely to receive honors relative to high pass (RR 2.45), 95% CI [1.72, 3.50], and for final grade, students at community sites were 1.9 times more likely to receive honors relative to pass (RR 1.98), 95% CI [1.27, 3.09], and 1.6 times more likely to receive honors relative to high pass (RR 1.62), 95% CI [1.05, 2.50], compared to those at academic sites. Students at community sites receive higher clinical and final grades in the OB/GYN clerkship. This highlights a significant challenge in decentralized clinical education-ensuring site comparability in clinical grading, Further work should examine the differences in sites, as well as improve standardization of clinical grading. This also underscores an important consideration, as the final grade can influence medical school rank, nomination into honor societies, and ranking of residency applicants.

  17. Overview of DOE Oil and Gas Field Laboratory Projects

    NASA Astrophysics Data System (ADS)

    Bromhal, G.; Ciferno, J.; Covatch, G.; Folio, E.; Melchert, E.; Ogunsola, O.; Renk, J., III; Vagnetti, R.

    2017-12-01

    America's abundant unconventional oil and natural gas (UOG) resources are critical components of our nation's energy portfolio. These resources need to be prudently developed to derive maximum benefits. In spite of the long history of hydraulic fracturing, the optimal number of fracturing stages during multi-stage fracture stimulation in horizontal wells is not known. In addition, there is the dire need of a comprehensive understanding of ways to improve the recovery of shale gas with little or no impacts on the environment. Research that seeks to expand our view of effective and environmentally sustainable ways to develop our nation's oil and natural gas resources can be done in the laboratory or at a computer; but, some experiments must be performed in a field setting. The Department of Energy (DOE) Field Lab Observatory projects are designed to address those research questions that must be studied in the field. The Department of Energy (DOE) is developing a suite of "field laboratory" test sites to carry out collaborative research that will help find ways of improving the recovery of energy resources as much as possible, with as little environmental impact as possible, from "unconventional" formations, such as shale and other low permeability rock formations. Currently there are three field laboratories in various stages of development and operation. Work is on-going at two of the sites: The Hydraulic Fracturing Test Site (HFTS) in the Permian Basin and the Marcellus Shale Energy and Environmental Lab (MSEEL) project in the Marcellus Shale Play. Agreement on the third site, the Utica Shale Energy and Environmental Lab (USEEL) project in the Utica Shale Play, was just recently finalized. Other field site opportunities may be forthcoming. This presentation will give an overview of the three field laboratory projects.

  18. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less

  19. Effect of Simplifying Drilling Technique on Heat Generation During Osteotomy Preparation for Dental Implant.

    PubMed

    El-Kholey, Khalid E; Ramasamy, Saravanan; Kumar R, Sheetal; Elkomy, Aamna

    2017-12-01

    To test the hypothesis that there would be no difference in heat production by reducing the number of drills during the implant site preparation relative to conventional drilling sequence. A total of 120 implant site preparations with 3 different diameters (3.6, 4.3, and 4.6 mm) were performed on bovine ribs. Within the same diameter group, half of the preparations were performed by a simplified drilling procedure (pilot drill + final diameter drill) and other half using the conventional drilling protocol (pilot drill followed by graduated series of drills to widen the site). Heat production by different drilling techniques was evaluated by measuring the bone temperature using k-type thermocouple and a sensitive thermometer before and after each drill. Mean for maximum temperature increase during site preparation of the 3.6, 4.3, and 4.6-mm implants was 2.45, 2.60, and 2.95° when the site was prepared by the simplified procedure, whereas it was 2.85, 3.10, and 3.60° for the sites prepared by the conventional technique, respectively. No significant difference in temperature increase was found when implants of the 3 different diameters were prepared either by the conventional or simplified drilling procedure. The simplified drilling technique produced similar amount of heat comparable to the conventional technique that proved the initial hypothesis.

  20. Functional Analysis of AP-2 α and μ2 Subunits

    PubMed Central

    Motley, Alison M.; Berg, Nicola; Taylor, Marcus J.; Sahlender, Daniela A.; Hirst, Jennifer; Owen, David J.

    2006-01-01

    The AP-2 adaptor complex plays a key role in cargo recognition and clathrin-coated vesicle formation at the plasma membrane. To investigate the functions of individual binding sites and domains of the AP-2 complex in vivo, we have stably transfected HeLa cells with wild-type and mutant small interfering RNA–resistant α and μ2 subunits and then used siRNA knockdowns to deplete the endogenous proteins. Mutating the PtdIns(4,5)P2 binding site of α, the phosphorylation site of μ2, or the YXXΦ binding site of μ2 impairs AP-2 function, as assayed by transferrin uptake. In contrast, removing the C-terminal appendage domain of α, or mutating the PtdIns(4,5)P2 binding site of μ2, has no apparent effect. However, adding a C-terminal GFP tag to α renders it completely nonfunctional. These findings demonstrate that there is some functional redundancy in the binding sites of the various AP-2 subunits, because no single mutation totally abolishes function. They also help to explain why GFP-tagged AP-2 never appears to leave the plasma membrane in some live cell imaging studies. Finally, they establish a new model system that can be used both for additional structure-function analyses, and as a way of testing tagged constructs for function in vivo. PMID:17035630

  1. Public-health assessment for Westinghouse (Sunnyvale Plant), Sunnyvale, Santa Clara County, California, Region 9, CERCLIS No. CAD001864081. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-28

    Located in Sunnyvale, California, the Westinghouse Electric Corporation Sunnyvale Plant is an active manufacturing facility currently manufacturing steam generators, marine propulsion systems, and missle launching systems for the Department of Defense. Between the mid-1950's and 1964, Westinghouse manufactured and tested electrical transformers in a building located at the southeastern part of the site near a water reservoir tank. The transformers contained mineral oil and Inerteen, which consisted principally of polychlorinated biphenyls (PCBs) and trichlorobenzene (TCB), as thermal insulating fluids. Handling and storage of Inerteen primarily led to soil and shallow groundwater contamination. In 1984 and 1985, Westinghouse removed contaminated soilsmore » along fencelines and railroad spurs. The remaining contamination exists principally in the southeastern part of the site near a water reservoir tank where the Inerteen storage tank and the associated pipelines were located. Based on information reviewed, the Agency for Toxic Substances Disease Registry (ATSDR) and the California Department of Health Services (CDHS) consider this site to be a public health hazard due to the past exposure to PCBs that nearby residences and on-site workers may have experienced.« less

  2. Four Finalist Landing Site Candidates for Mars Science Laboratory

    NASA Image and Video Library

    2008-11-19

    Out of more than 30 sites considered as possible landing targets for NASA Mars Science Laboratory mission, by November 2008 four of the most intriguing places on Mars rose to the final round of the site-selection process.

  3. MDD-carb: a combinatorial model for the identification of protein carbonylation sites with substrate motifs.

    PubMed

    Kao, Hui-Ju; Weng, Shun-Long; Huang, Kai-Yao; Kaunang, Fergie Joanda; Hsu, Justin Bo-Kai; Huang, Chien-Hsun; Lee, Tzong-Yi

    2017-12-21

    Carbonylation, which takes place through oxidation of reactive oxygen species (ROS) on specific residues, is an irreversibly oxidative modification of proteins. It has been reported that the carbonylation is related to a number of metabolic or aging diseases including diabetes, chronic lung disease, Parkinson's disease, and Alzheimer's disease. Due to the lack of computational methods dedicated to exploring motif signatures of protein carbonylation sites, we were motivated to exploit an iterative statistical method to characterize and identify carbonylated sites with motif signatures. By manually curating experimental data from research articles, we obtained 332, 144, 135, and 140 verified substrate sites for K (lysine), R (arginine), T (threonine), and P (proline) residues, respectively, from 241 carbonylated proteins. In order to examine the informative attributes for classifying between carbonylated and non-carbonylated sites, multifarious features including composition of twenty amino acids (AAC), composition of amino acid pairs (AAPC), position-specific scoring matrix (PSSM), and positional weighted matrix (PWM) were investigated in this study. Additionally, in an attempt to explore the motif signatures of carbonylation sites, an iterative statistical method was adopted to detect statistically significant dependencies of amino acid compositions between specific positions around substrate sites. Profile hidden Markov model (HMM) was then utilized to train a predictive model from each motif signature. Moreover, based on the method of support vector machine (SVM), we adopted it to construct an integrative model by combining the values of bit scores obtained from profile HMMs. The combinatorial model could provide an enhanced performance with evenly predictive sensitivity and specificity in the evaluation of cross-validation and independent testing. This study provides a new scheme for exploring potential motif signatures at substrate sites of protein carbonylation. The usefulness of the revealed motifs in the identification of carbonylated sites is demonstrated by their effective performance in cross-validation and independent testing. Finally, these substrate motifs were adopted to build an available online resource (MDD-Carb, http://csb.cse.yzu.edu.tw/MDDCarb/ ) and are also anticipated to facilitate the study of large-scale carbonylated proteomes.

  4. Addendum to the Closure Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  5. Addendum to the Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS TA-03-001-TARC Roller Coaster Lagoons • CAS TA-21-001-TARC Roller Coaster N. Disposal Trench These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify these URs to administrative URs. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). These Administrative URs were based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  6. Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU UP-1 Wells 299-W19-48, 699-30-66, and 699-36-70B

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spane, Frank A.; Newcomer, Darrell R.

    2010-06-15

    This report presents test descriptions and analysis results for multiple, stress-level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) UP-1 wells: 299-W19-48 (C4300/Well K), 699-30-66 (C4298/Well R), and 699-36-70B (C4299/Well P). These wells are located within, adjacent to, and to the southeast of the Hanford Site 200-West Area. The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OUmore » UP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.« less

  7. Slug Test Characterization Results for Multi-Test/Depth Intervals Conducted During the Drilling of CERCLA Operable Unit OU ZP-1 Wells 299-W11-43, 299-W15-50, and 299-W18-16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spane, Frank A.; Newcomer, Darrell R.

    2010-06-21

    The following report presents test descriptions and analysis results for multiple, stress level slug tests that were performed at selected test/depth intervals within three Operable Unit (OU) ZP-1 wells: 299-W11-43 (C4694/Well H), 299-W15-50 (C4302/Well E), and 299-W18-16 (C4303/Well D). These wells are located within south-central region of the Hanford Site 200-West Area (Figure 1.1). The test intervals were characterized as the individual boreholes were advanced to their final drill depths. The primary objective of the hydrologic tests was to provide information pertaining to the areal variability and vertical distribution of hydraulic conductivity with depth at these locations within the OUmore » ZP-1 area. This type of characterization information is important for predicting/simulating contaminant migration (i.e., numerical flow/transport modeling) and designing proper monitor well strategies for OU and Waste Management Area locations.« less

  8. Quantifying site-specific physical heterogeneity within an estuarine seascape

    USGS Publications Warehouse

    Kennedy, Cristina G.; Mather, Martha E.; Smith, Joseph M.

    2017-01-01

    Quantifying physical heterogeneity is essential for meaningful ecological research and effective resource management. Spatial patterns of multiple, co-occurring physical features are rarely quantified across a seascape because of methodological challenges. Here, we identified approaches that measured total site-specific heterogeneity, an often overlooked aspect of estuarine ecosystems. Specifically, we examined 23 metrics that quantified four types of common physical features: (1) river and creek confluences, (2) bathymetric variation including underwater drop-offs, (3) land features such as islands/sandbars, and (4) major underwater channel networks. Our research at 40 sites throughout Plum Island Estuary (PIE) provided solutions to two problems. The first problem was that individual metrics that measured heterogeneity of a single physical feature showed different regional patterns. We solved this first problem by combining multiple metrics for a single feature using a within-physical feature cluster analysis. With this approach, we identified sites with four different types of confluences and three different types of underwater drop-offs. The second problem was that when multiple physical features co-occurred, new patterns of total site-specific heterogeneity were created across the seascape. This pattern of total heterogeneity has potential ecological relevance to structure-oriented predators. To address this second problem, we identified sites with similar types of total physical heterogeneity using an across-physical feature cluster analysis. Then, we calculated an additive heterogeneity index, which integrated all physical features at a site. Finally, we tested if site-specific additive heterogeneity index values differed for across-physical feature clusters. In PIE, the sites with the highest additive heterogeneity index values were clustered together and corresponded to sites where a fish predator, adult striped bass (Morone saxatilis), aggregated in a related acoustic tracking study. In summary, we have shown general approaches to quantifying site-specific heterogeneity.

  9. Characterization of the clustered regularly interspaced short palindromic repeats sites in Streptococcus mutans isolated from early childhood caries patients.

    PubMed

    Chen, Jing; Li, Tiancheng; Zhou, Xuedong; Cheng, Lei; Huo, Yuanyuan; Zou, Jing; Li, Yuqing

    2017-11-01

    The aim of this study was to analyze the characteristics of the clustered regularly interspaced short palindromic repeats (CRISPR) sites in 45 clinical Streptococcus mutans strains and their relationship to the clinical manifestations of early childhood caries (ECC). Forty-five S. mutans strains were isolated from the plaque samples taken from sixty-three children. CRISPR sites were sequenced and BLAST was used to compare these sites to those in the CRISPRTarget database. The association between the distribution of CRISPR sites and the manifestation of caries was analyzed by Chi-Square test. Further, biofilm formation (by crystal violet staining) and the synthesis of polysaccharide (by anthrone-sulfuric method) of all clinical isolated S. mutans strains with both CRISPR sites and no CRISPR site were comapared. Finally, acidogenicity and acidurity of two typical strains were determined using pH drop and acid tolerance assays. Biofilm formation and EPS synthesis by two typical strains were compared by 3D CLSM (Confocal Laser Scanning Microscope) assays and the expression of gtf genes were evaluated using qPCR. We found that most of the spacers in the clinical S. mutans strains were derived from Streptococcus phages APCM01 and M102. The number of CRISPR sites in these strains was associated with the clinical manifestations of ECC. Moreover, we found that the biofilm formation and EPS synthesis ability of the S. mutans strains with both CRISPR sites was significant improved. An association was found between the distribution of CRISPR sites and the clinical manifestations of caries. The CRISPR sites might contribute to the cariogenic potential of S. mutans. Copyright © 2017 Elsevier Ltd. All rights reserved.

  10. Determination of Soil Moisture Content using Laboratory Experimental and Field Electrical Resistivity Values

    NASA Astrophysics Data System (ADS)

    Hazreek, Z. A. M.; Rosli, S.; Fauziah, A.; Wijeyesekera, D. C.; Ashraf, M. I. M.; Faizal, T. B. M.; Kamarudin, A. F.; Rais, Y.; Dan, M. F. Md; Azhar, A. T. S.; Hafiz, Z. M.

    2018-04-01

    The efficiency of civil engineering structure require comprehensive geotechnical data obtained from site investigation. In the past, conventional site investigation was heavily related to drilling techniques thus suffer from several limitations such as time consuming, expensive and limited data collection. Consequently, this study presents determination of soil moisture content using laboratory experimental and field electrical resistivity values (ERV). Field and laboratory electrical resistivity (ER) test were performed using ABEM SAS4000 and Nilsson400 soil resistance meter. Soil sample used for resistivity test was tested for characterization test specifically on particle size distribution and moisture content test according to BS1377 (1990). Field ER data was processed using RES2DINV software while laboratory ER data was analyzed using SPSS and Excel software. Correlation of ERV and moisture content shows some medium relationship due to its r = 0.506. Moreover, coefficient of determination, R2 analyzed has demonstrate that the statistical correlation obtain was very good due to its R2 value of 0.9382. In order to determine soil moisture content based on statistical correlation (w = 110.68ρ-0.347), correction factor, C was established through laboratory and field ERV given as 19.27. Finally, this study has shown that soil basic geotechnical properties with particular reference to water content was applicably determined using integration of laboratory and field ERV data analysis thus able to compliment conventional approach due to its economic, fast and wider data coverage.

  11. An approach to industrial water conservation--a case study involving two large manufacturing companies based in Australia.

    PubMed

    Agana, Bernard A; Reeve, Darrell; Orbell, John D

    2013-01-15

    This study presents the application of an integrated water management strategy at two large Australian manufacturing companies that are contrasting in terms of their respective products. The integrated strategy, consisting of water audit, pinch analysis and membrane process application, was deployed in series to systematically identify water conservation opportunities. Initially, a water audit was deployed to completely characterize all water streams found at each production site. This led to the development of a water balance diagram which, together with water test results, served as a basis for subsequent enquiry. After the water audit, commercially available water pinch software was utilized to identify possible water reuse opportunities, some of which were subsequently implemented on site. Finally, utilizing a laboratory-scale test rig, membrane processes such as UF, NF and RO were evaluated for their suitability to treat the various wastewater streams. The membranes tested generally showed good contaminant rejection rates, slow flux decline rates, low energy usage and were well suited for treatment of specific wastewater streams. The synergy between the various components of this strategy has the potential to reduce substantial amounts of Citywater consumption and wastewater discharge across a diverse range of large manufacturing companies. Crown Copyright © 2012. Published by Elsevier Ltd. All rights reserved.

  12. An accurate on-site calibration system for electronic voltage transformers using a standard capacitor

    NASA Astrophysics Data System (ADS)

    Hu, Chen; Chen, Mian-zhou; Li, Hong-bin; Zhang, Zhu; Jiao, Yang; Shao, Haiming

    2018-05-01

    Ordinarily electronic voltage transformers (EVTs) are calibrated off-line and the calibration procedure requires complex switching operations, which will influence the reliability of the power grid and induce large economic losses. To overcome this problem, this paper investigates a 110 kV on-site calibration system for EVTs, including a standard channel, a calibrated channel and a PC equipped with the LabView environment. The standard channel employs a standard capacitor and an analogue integrating circuit to reconstruct the primary voltage signal. Moreover, an adaptive full-phase discrete Fourier transform (DFT) algorithm is proposed to extract electrical parameters. The algorithm involves the process of extracting the frequency of the grid, adjusting the operation points, and calculating the results using DFT. In addition, an insulated automatic lifting device is designed to realize the live connection of the standard capacitor, which is driven by a wireless remote controller. A performance test of the capacitor verifies the accurateness of the standard capacitor. A system calibration test shows that the system ratio error is less than 0.04% and the phase error is below 2‧, which meets the requirement of the 0.2 accuracy class. Finally, the developed calibration system was used in a substation, and the field test data validates the availability of the system.

  13. Choosing a Field: How Graduate Student Choices of Field Sites Reflect Different Ideas of "Real" Anthropology in Colombia and the United States

    ERIC Educational Resources Information Center

    Macia, Laura

    2012-01-01

    This paper examines the decisions and motivations of graduate students in cultural anthropology when defining the field sites and topics of their final projects. The decisions among students at the Universidad de los Andes in Colombia are contrasted with those at the University of Pittsburgh in the United States. A review of recent final projects…

  14. Remedial Investigation Report Area of Contamination (AOC) 43G. Volume 1

    DTIC Science & Technology

    1996-02-01

    FORT DEVENS FINAL REMEDIAL INVESTIGATION FOR GROUP 2 & 7 SITES FINAL REMEDIAL INVESTIGATION REPORT AREA OF CONTAMINATION ( AOC ) 43G VOLUME I OF II...Liability Act for environmental investigations and remedial actions at Fort Devens . The agreement required that Site Investigations be undertaken at each... Remedial Investigation (RI) Report on Area of Contamination ( AOC ) 43G at the Fort Devens U.S. Army Installation, Massachusetts (

  15. Solar electric power for instruments at remote sites

    USGS Publications Warehouse

    McChesney, P.J.

    2000-01-01

    Small photovoltaic (PV) systems are the preferred method to power instruments operating at permanent locations away from the electric power grid. The low-power PV power system consists of a solar panel or small array of panels, lead-acid batteries, and a charge controller. Even though the small PV power system is simple, the job of supplying power at a remote site can be very demanding. The equipment is often exposed to harsh conditions. The site may be inaccessible part of the year or difficult and expensive to reach at any time. Yet the system must provide uninterrupted power with minimum maintenance at low cost. This requires good design. Successful small PV systems often require modifications by a knowledgeable fieldworker to adapt to conditions at the site. Much information is available in many places about solar panels, lead-acid batteries, and charging systems but very little of it applies directly to low power instrument sites. The discussion here aims to close some of the gap. Each of the major components is described in terms of this application with particular attention paid to batteries. Site problems are investigated. Finally, maintenance and test procedures are given. This document assumes that the reader is engaged in planning or maintaining low-power PV sites and has basic electrical and electronic knowledge. The area covered by the discussion is broad. To help the reader with the many terms and acronyms used, they are shown in bold when first used and a glossary is provided at the end of the paper.

  16. Evaluation of continuous oxydesulfurization processes. Final technical report, September 1979-July 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jones, J.F.; Wever, D.M.

    1981-07-01

    Three processes developed by Pittsburgh Energy Technology Center (PETC), Ledgemont Laboratories, and Ames Laboratories for the oxydesulfurization of coal were evaluated in continuous processing equipment designed, built, and/or adapted for the purpose at the DOE-owned Multi-Use Fuels and Energy Processes Test Plant (MEP) located at TRW's Capistrano Test Site in California. The three processes differed primarily in the chemical additives (none, sodium carbonate, or ammonia), fed to the 20% to 40% coal/water slurries, and in the oxygen content of the feed gas stream. Temperature, pressure, residence time, flow rates, slurry concentration and stirrer speed were the other primary independent variables.more » The amount of organic sulfur removed, total sulfur removed and the Btu recovery were the primary dependent variables. Evaluation of the data presented was not part of the test effort.« less

  17. A pilot study on the transfer of 137Cs and 90Sr to horse milk and meat.

    PubMed

    Semioshkina, N; Voigt, G; Fesenko, S; Savinkov, A; Mukusheva, M

    2006-01-01

    The radiological assessment of the impact of nuclear weapon's testing on the Semipalatinsk Test Site (STS) on the local population requires comprehensive site-specific information on radionuclide behaviour in the environment. However, information on radionuclide behaviour in the conditions of the STS is rather sparse and, in particular, there are no data in the literature on parameters of radionuclide transfer from feed to horse products proofed to be important contributors to the internal dose to the local population. The transfer of 137Cs and 90Sr to horse milk and meat was studied under laboratory and field conditions: in controlled experiment with three lactating horses maintained in the Kazakh Agricultural Research Institute, and in field measurements of horse products taken from horses grazing at the Semipalatinsk Test Site. The equilibrium transfer factors from feed to horse milk and meat were estimated to be 0.012 dl(-1) and 0.035 dkg(-1) for (137)Cs and 0.0022 dl(-1) and 0.003 dkg(-1) for (90)Sr, respectively. The biological half-lives were approximated by a sum of two exponentials amounting to 3 (85%) and 15 (15%) days for 137Cs and 3.5 (70%) and 100 (30%) days for 90Sr. The highest 137Cs transfer has been found to be to spleen, followed by lung, heart, muscles, kidneys, intestine, and finally skin and bones. For90Sr, the maximum activity concentration was observed in bones; contamination of other tissues is rather uniform except for liver and intestine with a factor of about 2 higher than muscles.

  18. A Fish-Based Index of Biotic Integrity for the Assessment of Streams Located in a Sugarcane-Dominated Landscape in Southeastern Brazil.

    PubMed

    dos Santos, Fernanda Bastos; Esteves, Katharina Eichbaum

    2015-08-01

    A multimetric, fish-based Index of Biotic Integrity (IBI) was developed and tested to assess the ecological status of streams with different riparian conditions in the Piracicaba River Basin. Nine streams with three categories of riparian zone preservation were selected: native forest (NF) with preserved forest, secondary forest (SF) with forest in an advanced state of regeneration and surrounded by sugarcane plantations, and sugarcane (SC) without riparian vegetation and surrounded by SC crops. A continuous scoring system was employed, and candidate metrics were tested for range, responsiveness, and redundancy, resulting in the selection of eight metrics to compose the index. The final IBI score was positively correlated with an Environmental Index both in the dry (Spearman's rho = 0.76; P = 0.01) and rainy seasons (Spearman's rho = 0.66; P = 0.04), suggesting that this IBI is a suitable tool for the assessment of the biological conditions of these streams. The highest IBI values were observed in the rainy season at the NF and SF sites, with significant differences between the NF and SC sites (Kruskal-Wallis test: P = 0.03). The results indicated some variability in the biological integrity at SF and SC sites, suggesting a relationship with the intensity of the management of this crop. Patterns were consistent with other studies that have shown the effects of agriculture on the environmental quality of streams, which indicate the importance of the riparian zone to the maintenance of ecosystem integrity and supports the use of the IBI for biological monitoring in similar regions.

  19. A Fish-Based Index of Biotic Integrity for the Assessment of Streams Located in a Sugarcane-Dominated Landscape in Southeastern Brazil

    NASA Astrophysics Data System (ADS)

    dos Santos, Fernanda Bastos; Esteves, Katharina Eichbaum

    2015-08-01

    A multimetric, fish-based Index of Biotic Integrity (IBI) was developed and tested to assess the ecological status of streams with different riparian conditions in the Piracicaba River Basin. Nine streams with three categories of riparian zone preservation were selected: native forest (NF) with preserved forest, secondary forest (SF) with forest in an advanced state of regeneration and surrounded by sugarcane plantations, and sugarcane (SC) without riparian vegetation and surrounded by SC crops. A continuous scoring system was employed, and candidate metrics were tested for range, responsiveness, and redundancy, resulting in the selection of eight metrics to compose the index. The final IBI score was positively correlated with an Environmental Index both in the dry (Spearman's rho = 0.76; P = 0.01) and rainy seasons (Spearman's rho = 0.66; P = 0.04), suggesting that this IBI is a suitable tool for the assessment of the biological conditions of these streams. The highest IBI values were observed in the rainy season at the NF and SF sites, with significant differences between the NF and SC sites (Kruskal-Wallis test: P = 0.03). The results indicated some variability in the biological integrity at SF and SC sites, suggesting a relationship with the intensity of the management of this crop. Patterns were consistent with other studies that have shown the effects of agriculture on the environmental quality of streams, which indicate the importance of the riparian zone to the maintenance of ecosystem integrity and supports the use of the IBI for biological monitoring in similar regions.

  20. Sampling and analysis plan for assessment of beryllium in soils surrounding TA-40 building 15

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruedig, Elizabeth

    Technical Area (TA) 40 Building 15 (40-15) is an active firing site at Los Alamos National Laboratory. The weapons facility operations (WFO) group plans to build an enclosure over the site in 2017, so that test shots may be conducted year-round. The enclosure project is described in PRID 16P-0209. 40-15 is listed on LANL OSH-ISH’s beryllium inventory, which reflects the potential for beryllium in/on soils and building surfaces at 40-15. Some areas in and around 40-15 have previously been sampled for beryllium, but past sampling efforts did not achieve complete spatial coverage of the area. This Sampling and Analysis Planmore » (SAP) investigates the area surrounding 40-15 via 9 deep (≥1-ft.) soil samples and 11 shallow (6-in.) soil samples. These samples will fill the spatial data gaps for beryllium at 40-15, and will be used to support OSH-ISH’s final determination of 40-15’s beryllium registry status. This SAP has been prepared by the Environmental Health Physics program in consultation with the Industrial Hygiene program. Industrial Hygiene is the owner of LANL’s beryllium program, and will make a final determination with regard to the regulatory status of beryllium at 40-15.« less

  1. Evaluation of landfill gas production and emissions in a MSW large-scale Experimental Cell in Brazil.

    PubMed

    Maciel, Felipe Jucá; Jucá, José Fernando Thomé

    2011-05-01

    Landfill gas (LFG) emissions from municipal solid waste (MSW) landfills are an important environmental concern in Brazil due to the existence of several uncontrolled disposal sites. A program of laboratory and field tests was conducted to investigate gas generation in and emission from an Experimental Cell with a 36,659-ton capacity in Recife/PE - Brazil. This investigation involved waste characterisation, gas production and emission monitoring, and geotechnical and biological evaluations and was performed using three types of final cover layers. The results obtained in this study showed that waste decomposes 4-5 times faster in a tropical wet climate than predicted by traditional first-order models using default parameters. This fact must be included when considering the techniques and economics of projects developed in tropical climate countries. The design of the final cover layer and its geotechnical and biological behaviour proved to have an important role in minimising gas emissions to the atmosphere. Capillary and methanotrophic final cover layers presented lower CH(4) flux rates than the conventional layer. Copyright © 2011 Elsevier Ltd. All rights reserved.

  2. Programming and machining of complex parts based on CATIA solid modeling

    NASA Astrophysics Data System (ADS)

    Zhu, Xiurong

    2017-09-01

    The complex parts of the use of CATIA solid modeling programming and simulation processing design, elaborated in the field of CNC machining, programming and the importance of processing technology. In parts of the design process, first make a deep analysis on the principle, and then the size of the design, the size of each chain, connected to each other. After the use of backstepping and a variety of methods to calculate the final size of the parts. In the selection of parts materials, careful study, repeated testing, the final choice of 6061 aluminum alloy. According to the actual situation of the processing site, it is necessary to make a comprehensive consideration of various factors in the machining process. The simulation process should be based on the actual processing, not only pay attention to shape. It can be used as reference for machining.

  3. A meta-analysis of in vitro antibiotic synergy against Acinetobacter baumannii.

    PubMed

    March, Gabriel A; Bratos, Miguel A

    2015-12-01

    The aim of the work was to describe the different in vitro models for testing synergism of antibiotics and gather the results of antibiotic synergy against multidrug-resistant Acinetobacter baumannii (MDR-Ab). The different original articles were obtained from different web sites. In order to compare the results obtained by the different methods for synergy testing, the Pearson chi-square and the Fischer tests were used. Moreover, non-parametric chi-square test was used in order to compare the frequency distribution in each analysed manuscript. In the current meta-analysis 24 manuscripts, which encompassed 2016 tests of in vitro synergism of different antimicrobials against MDR-Ab, were revised. Checkerboard synergy testing was used in 11 studies, which encompasses 1086 tests (53.9%); time-kill assays were applied in 12 studies, which encompass 359 tests (17.8%); gradient diffusion methods were used in seven studies, encompassing 293 tests (14.5%). And, finally, time-kill plus checkerboard were applied in two studies, encompassing 278 tests (13.8%). By comparing these data, checkerboard and time-kill methods were significantly more used than gradient diffusion methods (p<0.005). Regarding synergy rates obtained on the basis of the applied method, checkerboard provided 227 tests (20.9%) with a synergistic effect; time-kill assays yielded 222 tests (61.8%) with a synergistic effect; gradient diffusion methods only provided 29 tests (9.9%) with a synergistic effect; and, finally, time-kill plus checkerboard yielded just 15 tests (5.4%) with a synergistic effect. When comparing these percentages, synergy rates reported by time-kill methods were significantly higher than that obtained by checkerboard and gradient diffusion methods (p<0.005). On the basis of the revised data, the combinations of a bactericidal antibiotic plus Tigecycline, Vancomycin or Teicoplanin are not recommended. The best combinations of antibiotics are those which include bactericidal antibiotics such as Carbapenems, Fosfomycin, Amikacin, Polymyxins, Rifampicin and Ampicillin/Sulbactam. Copyright © 2015. Published by Elsevier B.V.

  4. Field Testing of Environmentally Friendly Drilling System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Burnett

    2009-05-31

    The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of themore » environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.« less

  5. DEVELOPMENT AND DEPLOYMENT OF VACUUM SALT DISTILLATION AT THE SAVANNAH RIVER SITE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pierce, R.; Pak, D.; Edwards, T.

    2010-10-28

    The Savannah River Site has a mission to dissolve fissile materials and disposition them. The primary fissile material is plutonium dioxide (PuO{sub 2}). To support dissolution of these materials, the Savannah River National Laboratory (SRNL) designed and demonstrated a vacuum salt distillation (VSD) apparatus using both representative radioactive samples and non-radioactive simulant materials. Vacuum salt distillation, through the removal of chloride salts, increases the quantity of materials suitable for processing in the site's HB-Line Facility. Small-scale non-radioactive experiments at 900-950 C show that >99.8 wt % of the initial charge of chloride salt distilled from the sample boat with recoverymore » of >99.8 wt % of the ceric oxide (CeO{sub 2}) - the surrogate for PuO{sub 2} - as a non-chloride bearing 'product'. Small-scale radioactive testing in a glovebox demonstrated the removal of sodium chloride (NaCl) and potassium chloride (KCl) from 13 PuO{sub 2} samples. Chloride concentrations were distilled from a starting concentration of 1.8-10.8 wt % to a final concentration <500 mg/kg chloride. Initial testing of a non-radioactive, full-scale production prototype is complete. A designed experiment evaluated the impact of distillation temperature, time at temperature, vacuum, product depth, and presence of a boat cover. Significant effort has been devoted to mechanical considerations to facilitate simplified operation in a glovebox.« less

  6. Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Undrground Storage Tank Release Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  7. Addendum to the Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  8. Addendum to the Closure Report for Corrective Action Unit 398: Area 25 Spill Sites, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  9. Addendum to the Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  10. Final Technical Report: Hydrogen Energy in Engineering Education (H2E3)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehman, Peter A.; Cashman, Eileen; Lipman, Timothy

    2011-09-15

    Schatz Energy Research Center's Hydrogen Energy in Engineering Education curriculum development project delivered hydrogen energy and fuel cell learning experiences to over 1,000 undergraduate engineering students at five California universities, provided follow-on internships for students at a fuel cell company; and developed commercializable hydrogen teaching tools including a fuel cell test station and a fuel cell/electrolyzer experiment kit. Monitoring and evaluation tracked student learning and faculty and student opinions of the curriculum, showing that use of the curriculum did advance student comprehension of hydrogen fundamentals. The project web site (hydrogencurriculum.org) provides more information.

  11. Natural environment analysis

    NASA Technical Reports Server (NTRS)

    Frost, W.

    1985-01-01

    The influence of terrain features on wind loading of the space shuttle while on the launch pad, or during early liftoff, was investigated both qualitatively and quantitatively. The climatology and meteorology producing macroscale wind patterns and characteristics for the Vandenburg Air Force Base launch site are described. Field test data are analyzed, and the nature and characteristic of flow disturbances due to the various terrain features, both natural and man-made, are reviewed. The magnitude of these wind loads are estimated. Finally, effects of turbulence are discussed. It is concluded that the influence of complex terrain can create significant wind loading on the vehicle.

  12. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    DOT National Transportation Integrated Search

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  13. Classification of MEC with the ALLTEM at Camp Stanley, Texas

    USGS Publications Warehouse

    Asch, T.; Moulton, C.; Smith, D.V.

    2011-01-01

    The ALLTEM is a multi-axis electromagnetic induction system designed for unexploded ordnance UXO applications. It uses a continuous triangle-wave excitation and provides good late-time signal-to-noise ratio SNR especially for ferrous targets. Multi-axis transmitter Tx and receiver Rx systems such as ALLTEM provide a richer data set from which to invert for the target parameters required to distinguish between clutter and UXO. Inversions of field data acquired between 2006 and 2010 over the Army's UXO Standardized Test sites at the Yuma Proving Ground YPG in Arizona and at the Aberdeen Proving Ground APG in Maryland have produced reasonable and generally repeatable results for many UXO items buried at different orientations and depths. In February-March 2011 ALLTEM data was acquired at two locations on the Camp Stanley Storage Activity CSSA just north of San Antonio, Texas. Camp Stanley is used to store munitions as well as test, fire, and overhaul munitions components. Site B-20 is an open burn/open detonation OBOD area and Site B-27 consists of narrow trenches blasted into limestone containing buried range and munitions debris and possibly MEC. The processing, analysis, and classification techniques developed at the controlled environments of YPG and APG have been applied to these two "live" sites at Camp Stanley. ALLTEM data analysis includes both classical numerical inversion of data from each anomaly and clustering of the raw data by means of a self-organizing map SOM via generalized neural network algorithms. Final classification consists of an integration of both the numerical and SOM results. ?? 2011 Society of Exploration Geophysicists.

  14. From Ground Truth to Space: Surface, Subsurface and Remote Observations Associated with Nuclear Test Detection

    NASA Astrophysics Data System (ADS)

    Sussman, A. J.; Anderson, D.; Burt, C.; Craven, J.; Kimblin, C.; McKenna, I.; Schultz-Fellenz, E. S.; Miller, E.; Yocky, D. A.; Haas, D.

    2016-12-01

    Underground nuclear explosions (UNEs) result in numerous signatures that manifest on a wide range of temporal and spatial scales. Currently, prompt signals, such as the detection of seismic waves provide only generalized locations and the timing and amplitude of non-prompt signals are difficult to predict. As such, research into improving the detection, location, and identification of suspect events has been conducted, resulting in advancement of nuclear test detection science. In this presentation, we demonstrate the scalar variably of surface and subsurface observables, briefly discuss current capabilities to locate, detect and characterize potential nuclear explosion locations, and explain how emergent technologies and amalgamation of disparate data sets will facilitate improved monitoring and verification. At the smaller scales, material and fracture characterization efforts on rock collected from legacy UNE sites and from underground experiments using chemical explosions can be incorporated into predictive modeling efforts. Spatial analyses of digital elevation models and orthoimagery of both modern conventional and legacy nuclear sites show subtle surface topographic changes and damage at nearby outcrops. Additionally, at sites where such technology cannot penetrate vegetative cover, it is possible to use the vegetation itself as both a companion signature reflecting geologic conditions and showing subsurface impacts to water, nutrients, and chemicals. Aerial systems based on RGB imagery, light detection and ranging, and hyperspectral imaging can allow for combined remote sensing modalities to perform pattern recognition and classification tasks. Finally, more remote systems such as satellite based synthetic aperture radar and satellite imagery are other techniques in development for UNE site detection, location and characterization.

  15. Lessons from Digestive-Tract Symbioses Between Bacteria and Invertebrates.

    PubMed

    Graf, Joerg

    2016-09-08

    In most animals, digestive tracts harbor the greatest number of bacteria in the animal that contribute to its health: by aiding in the digestion of nutrients, provisioning essential nutrients and protecting against colonization by pathogens. Invertebrates have been used to enhance our understanding of metabolic processes and microbe-host interactions owing to experimental advantages. This review describes how advances in DNA sequencing technologies have dramatically altered how researchers investigate microbe-host interactions, including 16S rRNA gene surveys, metagenome experiments, and metatranscriptome studies. Advantages and challenges of each of these approaches are described herein. Hypotheses generated through omics studies can be directly tested using site-directed mutagenesis, and findings from transposon studies and site-directed experiments are presented. Finally, unique structural aspects of invertebrate digestive tracts that contribute to symbiont specificity are presented. The combination of omics approaches with genetics and microscopy allows researchers to move beyond correlations to identify conserved mechanisms of microbe-host interactions.

  16. PROGRESS REPORT: COFIRING PROJECTS FOR WILLOW ISLAND AND ALBRIGHT GENERATING STATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. Payette; D. Tillman

    During the period April 1, 2001--June 30, 2001, Allegheny Energy Supply Co., LLC (Allegheny) accelerated construction of the Willow Island cofiring project, completed the installation of foundations for the fuel storage facility, the fuel receiving facility, and the processing building. Allegheny received all processing equipment to be installed at Willow Island. Allegheny completed the combustion modeling for the Willow Island project. During this time period construction of the Albright Generating Station cofiring facility was completed, with few items left for final action. The facility was dedicated at a ceremony on June 29. Initial testing of cofiring at the facility commenced.more » This report summarizes the activities associated with the Designer Opportunity Fuel program, and demonstrations at Willow Island and Albright Generating Stations. It details the construction activities at both sites along with the combustion modeling at the Willow Island site.« less

  17. Biological monitoring of Upper Three Runs Creek, Savannah River Plant, Aiken County, South Carolina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Specht, W.L.

    1991-10-01

    In anticipation of the fall 1988 start up of effluent discharges into Upper Three Creek by the F/H Area Effluent Treatment Facility of the Savannah River Site, Aiken, SC, a two and one half year biological study was initiated in June 1987. Upper Three Runs Creek is an intensively studied fourth order stream known for its high species richness. Designed to assess the potential impact of F H area effluent on the creek, the study includes qualitative and quantitative macroinvertebrate stream surveys at five sites, chronic toxicity testing of the effluent, water chemistry and bioaccumulation analysis. This final report presentsmore » the results of both pre-operational and post-operational qualitative and quantitative (artificial substrate) macroinvertebrate studies. Six quantitative and three qualitative studies were conducted prior to the initial release of the F/H ETF effluent and five quantitative and two qualitative studies were conducted post-operationally.« less

  18. Web Content Management Systems: An Analysis of Forensic Investigatory Challenges.

    PubMed

    Horsman, Graeme

    2018-02-26

    With an increase in the creation and maintenance of personal websites, web content management systems are now frequently utilized. Such systems offer a low cost and simple solution for those seeking to develop an online presence, and subsequently, a platform from which reported defamatory content, abuse, and copyright infringement has been witnessed. This article provides an introductory forensic analysis of the three current most popular web content management systems available, WordPress, Drupal, and Joomla! Test platforms have been created, and their site structures have been examined to provide guidance for forensic practitioners facing investigations of this type. Result's document available metadata for establishing site ownership, user interactions, and stored content following analysis of artifacts including Wordpress's wp_users, and wp_comments tables, Drupal's "watchdog" records, and Joomla!'s _users, and _content tables. Finally, investigatory limitations documenting the difficulties of investigating WCMS usage are noted, and analysis recommendations are offered. © 2018 American Academy of Forensic Sciences.

  19. Cultural Resources Literature Search and Records Review - Upper Mississippi River Basin. Volume 1. Introduction and Narrative

    DTIC Science & Technology

    1983-01-01

    project area. The following summary taken from the final environmental impact statement prepared by the St. Paul District in 1974, serves well to...Archeologist 62 (2): 168-205. U.S. ARMY CORPS OF ENGINEERS 1974 Final Environmental Impact Statement: Operation and Maintenance, 9 Foot Navigation Channel...Spring Hollow Rock Shelter No. 2; Elephant Site; Waterville Rock Shelter; Jeffey Edwards Creek Rock Shelter; Pufahl Site, Allamakee County; Gingerstairs

  20. Pilot for Alaska Students with Deaf-Blindness: Inclusion in Regular Classrooms (PALS). Final Performance Report, October 1, 1992 to September 30, 1995.

    ERIC Educational Resources Information Center

    Brown, DiAnn; Maiuri, Fran

    This final report describes a pilot 3-year project in Alaska to include children with deaf-blindness in regular classrooms. The project established and supported two pilot sites for inclusion of students with deaf-blindness, one urban and one rural. As a result of the project, three out of four pilot site students moved from self-contained special…

  1. Unfulfilled translation opportunities in industry sponsored clinical trials.

    PubMed

    Smed, Marie; Getz, Kenneth A

    2013-05-01

    Knowledge generated by site representatives through their participation in clinical trials is valuable for testing new products in use and obtaining final market approval. The leverage of this important knowledge is however challenged as the former direct relationships between in-house staff in the industry and site representatives are changing. The process of clinical trials has increased in complexity over the years, resulting in additional management layers. Besides an increase in internal management layers, sponsors often also outsource various tasks related to clinical trials to a CRO (Contract Research Organization) and thereby adding another link in the relationships between site and sponsor. These changes are intended to optimize the time-consuming and costly trial phases; however, there is a need to study whether valuable knowledge and experience is compromised in the process. Limited research exists on the full range of clinical practice insights obtained by investigators during and after clinical trials and how well these insights are transferred to study sponsors. This study explores the important knowledge-transfer processes between sites and sponsors and to what extent sites' knowledge gained in clinical trials is utilized by the industry. Responses from 451 global investigative site representatives are included in the study. The analysis of the extensive dataset reveals that the current processes of collaboration between sites and the industry restrict the leverage of valuable knowledge gained by physicians in the process of clinical trials. These restrictions to knowledge-transfer between site and sponsor are further challenged if CRO partners are integrated in the trial process. Copyright © 2013 Elsevier Inc. All rights reserved.

  2. Assessment and selection of geomorphosites and trails in the Miage Glacier area (Western Italian alps).

    PubMed

    Bollati, Irene; Smiraglia, Claudio; Pelfini, Manuela

    2013-04-01

    Glacial environments are considered geomorphosites because they exhibit all of the features that characterise sites of geomorphological interest. The Miage Glacier, in particular, is the most important debris-covered glacier of the Italian Alps, and it has been extensively studied since the 18th century because of its scientific features. In this area, the geomorphological and geological attributes are evaluated at 11 sites that have been individuated along the three main touristic trails, which allow an exploration of the surroundings of the glacial tongue and its two main lobes. Using a methodology previously tested in a fluvial environment, single sites and trails are quantitatively assessed to determine the most suitable trail for educational purposes. Hazards that could potentially affect the trails are considered in terms of both risk education and final selection of the most suitable trails for the various possible user groups. The richness of scientific data in this area should increase its importance as a geomorphosite by increasing the educational value of the Miage Glacier and the Veny Valley.

  3. Radionuclides in bats using a contaminated pond on the Nevada National Security Site, USA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Warren, Ronald W.; Hall, Derek B.; Greger, Paul D.

    In this study, perched groundwater percolating through radionuclide contamination in the E Tunnel Complex on the Nevada National Security Site, formerly the Nevada Test Site, emerges and is stored in a series of ponds making it available to wildlife, including bats. Since many bat species using the ponds are considered sensitive or protected/regulated and little information is available on dose to bats from radioactive water sources, bats were sampled to determine if the dose they were receiving exceeded the United States Department of Energy dose limit of 1.0E-3 Gy/day. Radionuclide concentrations in water, sediment, and flying insects were also measuredmore » as input parameters to the dose rate model and to examine trophic level relationships. The RESRAD-Biota model was used to calculate dose rates to bats using different screening levels. Efficacy of RESRAD-Biota and suggested improvements are discussed. Finally, dose to bats foraging and drinking at these ponds is well below the dose limit set to protect terrestrial biota populations.« less

  4. Assessment and Selection of Geomorphosites and Trails in the Miage Glacier Area (Western Italian Alps)

    NASA Astrophysics Data System (ADS)

    Bollati, Irene; Smiraglia, Claudio; Pelfini, Manuela

    2013-04-01

    Glacial environments are considered geomorphosites because they exhibit all of the features that characterise sites of geomorphological interest. The Miage Glacier, in particular, is the most important debris-covered glacier of the Italian Alps, and it has been extensively studied since the 18th century because of its scientific features. In this area, the geomorphological and geological attributes are evaluated at 11 sites that have been individuated along the three main touristic trails, which allow an exploration of the surroundings of the glacial tongue and its two main lobes. Using a methodology previously tested in a fluvial environment, single sites and trails are quantitatively assessed to determine the most suitable trail for educational purposes. Hazards that could potentially affect the trails are considered in terms of both risk education and final selection of the most suitable trails for the various possible user groups. The richness of scientific data in this area should increase its importance as a geomorphosite by increasing the educational value of the Miage Glacier and the Veny Valley.

  5. The dynamics of genetic draft in rapidly adapting populations.

    PubMed

    Kosheleva, Katya; Desai, Michael M

    2013-11-01

    The accumulation of beneficial mutations on competing genetic backgrounds in rapidly adapting populations has a striking impact on evolutionary dynamics. This effect, known as clonal interference, causes erratic fluctuations in the frequencies of observed mutations, randomizes the fixation times of successful mutations, and leaves distinct signatures on patterns of genetic variation. Here, we show how this form of "genetic draft" affects the forward-time dynamics of site frequencies in rapidly adapting asexual populations. We calculate the probability that mutations at individual sites shift in frequency over a characteristic timescale, extending Gillespie's original model of draft to the case where many strongly selected beneficial mutations segregate simultaneously. We then derive the sojourn time of mutant alleles, the expected fixation time of successful mutants, and the site frequency spectrum of beneficial and neutral mutations. Finally, we show how this form of draft affects inferences in the McDonald-Kreitman test and how it relates to recent observations that some aspects of genetic diversity are described by the Bolthausen-Sznitman coalescent in the limit of very rapid adaptation.

  6. One Primer To Rule Them All: Universal Primer That Adds BBa_B0034 Ribosomal Binding Site to Any Coding Standard 10 BioBrick

    PubMed Central

    2015-01-01

    Here, we present a universal, simple, efficient, and reliable way to add small BioBrick parts to any BioBrick via PCR that is compatible with BioBrick assembly standard 10. As a proof of principle, we have designed a universal primer, rbs_B0034, that contains a ribosomal binding site (RBS; BBa_B0034) and that can be used in PCR to amplify any coding BioBrick that starts with ATG. We performed test PCRs with rbs_B0034 on 31 different targets and found it to be 93.6% efficient. Moreover, when supplemented with a complementary primer, addition of RBS can be accomplished via whole plasmid site-directed mutagenesis, thus reducing the time required for further assembly of composite parts. The described method brings simplicity to the addition of small parts, such as regulatory elements to existing BioBricks. The final product of the PCR assembly is indistinguishable from the standard or 3A BioBrick assembly. PMID:25524097

  7. Radionuclides in bats using a contaminated pond on the Nevada National Security Site, USA

    DOE PAGES

    Warren, Ronald W.; Hall, Derek B.; Greger, Paul D.

    2014-01-03

    In this study, perched groundwater percolating through radionuclide contamination in the E Tunnel Complex on the Nevada National Security Site, formerly the Nevada Test Site, emerges and is stored in a series of ponds making it available to wildlife, including bats. Since many bat species using the ponds are considered sensitive or protected/regulated and little information is available on dose to bats from radioactive water sources, bats were sampled to determine if the dose they were receiving exceeded the United States Department of Energy dose limit of 1.0E-3 Gy/day. Radionuclide concentrations in water, sediment, and flying insects were also measuredmore » as input parameters to the dose rate model and to examine trophic level relationships. The RESRAD-Biota model was used to calculate dose rates to bats using different screening levels. Efficacy of RESRAD-Biota and suggested improvements are discussed. Finally, dose to bats foraging and drinking at these ponds is well below the dose limit set to protect terrestrial biota populations.« less

  8. Earthquake design criteria for small hydro projects in the Philippines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, P.P.; McCandless, D.H.; Asce, M.

    1995-12-31

    The definition of the seismic environment and seismic design criteria of more than twenty small hydro projects in the northern part of the island of Luzon in the Philippines took a special urgency on the wake of the Magnitude 7.7 earthquake that shook the island on July 17, 1990. The paper describes the approach followed to determine design shaking level criteria at each hydro site consistent with the seismic environment estimated at that same site. The approach consisted of three steps: (1) Seismicity: understanding the mechanisms and tectonic features susceptible to generate seismicity and estimating the associated seismicity levels, (2)more » Seismic Hazard: in the absence of an accurate historical record, using statistics to determine the expected level of ground shaking at a site during the operational 100-year design life of each Project, and (3) Criteria Selection: finally and most importantly, exercising judgment in estimating the final proposed level of shaking at each site. The resulting characteristics of estimated seismicity and seismic hazard and the proposed final earthquake design criteria are provided.« less

  9. Installation and first operation of the International Fusion Materials Irradiation Facility injector at the Rokkasho site

    NASA Astrophysics Data System (ADS)

    Gobin, Raphael; Bogard, Daniel; Bolzon, Benoit; Bourdelle, Gilles; Chauvin, Nicolas; Chel, Stéphane; Girardot, Patrick; Gomes, Adelino; Guiho, Patrice; Harrault, Francis; Loiseau, Denis; Lussignol, Yves; Misiara, Nicolas; Roger, Arnaud; Senée, Franck; Valette, Matthieu; Cara, Philippe; Duglué, Daniel; Gex, Dominique; Okumura, Yoshikazu; Marcos Ayala, Juan; Knaster, Juan; Marqueta, Alvaro; Kasugai, Atsushi; O'Hira, Shigeru; Shinto, Katsuhiro; Takahashi, Hiroki

    2016-02-01

    The International Fusion Materials Irradiation Facility (IFMIF) linear IFMIF prototype accelerator injector dedicated to high intensity deuteron beam production has been designed, built, and tested at CEA/Saclay between 2008 and 2012. After the completion of the acceptance tests at Saclay, the injector has been fully sent to Japan. The re-assembly of the injector has been performed between March and May 2014. Then after the check-out phase, the production of the first proton beam occurred in November 2014. Hydrogen and deuteron beam commissioning is now in progress after having proceeded with the final tests on the entire injector equipment including high power diagnostics. This article reports the different phases of the injector installation pointing out the safety and security needs, as well as the first beam production results in Japan and chopper tests. Detailed operation and commissioning results (with H+ and D+ 100 keV beams) are reported in a second article.

  10. Quality control for the first large areas of triple-GEM chambers for the CMS endcaps

    NASA Astrophysics Data System (ADS)

    Abbaneo, D.; Abbas, M.; Abbrescia, M.; Abi Akl, M.; Aboamer, O.; Acosta, D.; Ahmad, A.; Ahmed, W.; Aleksandrov, A.; Altieri, P.; Asawatangtrakuldee, C.; Aspell, P.; Assran, Y.; Awan, I.; Bally, S.; Ban, Y.; Banerjee, S.; Barashko, V.; Barria, P.; Bencze, G.; Beni, N.; Benussi, L.; Bhopatkar, V.; Bianco, S.; Bos, J.; Bouhali, O.; Braghieri, A.; Braibant, S.; Buontempo, S.; Calabria, C.; Caponero, M.; Caputo, C.; Cassese, F.; Castaneda, A.; Cauwenbergh, S.; Cavallo, F. R.; Celik, A.; Choi, M.; Choi, S.; Christiansen, J.; Cimmino, A.; Colafranceschi, S.; Colaleo, A.; Conde Garcia, A.; Czellar, S.; Dabrowski, M. M.; De Lentdecker, G.; De Oliveira, R.; de Robertis, G.; Dildick, S.; Dorney, B.; Endroczi, G.; Errico, F.; Fenyvesi, A.; Ferry, S.; Furic, I.; Giacomelli, P.; Gilmore, J.; Golovtsov, V.; Guiducci, L.; Guilloux, F.; Gutierrez, A.; Hadjiiska, R. M.; Hauser, J.; Hoepfner, K.; Hohlmann, M.; Hoorani, H.; Iaydjiev, P.; Jeng, Y. G.; Kamon, T.; Karchin, P.; Korytov, A.; Krutelyov, S.; Kumar, A.; Kim, H.; Lee, J.; Lenzi, T.; Litov, L.; Loddo, F.; Madorsky, A.; Maerschalk, T.; Maggi, M.; Magnani, A.; Mal, P. K.; Mandal, K.; Marchioro, A.; Marinov, A.; Majumdar, N.; Merlin, J. A.; Mitselmakher, G.; Mohanty, A. K.; Mohapatra, A.; Molnar, J.; Muhammad, S.; Mukhopadhyay, S.; Naimuddin, M.; Nuzzo, S.; Oliveri, E.; Pant, L. M.; Paolucci, P.; Park, I.; Passeggio, G.; Pavlov, B.; Philipps, B.; Piccolo, D.; Postema, H.; Puig Baranac, A.; Radi, A.; Radogna, R.; Raffone, G.; Ranieri, A.; Rashevski, G.; Riccardi, C.; Rodozov, M.; Rodrigues, A.; Ropelewski, L.; RoyChowdhury, S.; Ryu, G.; Ryu, M. S.; Safonov, A.; Salva, S.; Saviano, G.; Sharma, A.; Sharma, A.; Sharma, R.; Shah, A. H.; Shopova, M.; Sturdy, J.; Sultanov, G.; Swain, S. K.; Szillasi, Z.; Talvitie, J.; Tatarinov, A.; Tuuva, T.; Tytgat, M.; Vai, I.; Van Stenis, M.; Venditti, R.; Verhagen, E.; Verwilligen, P.; Vitulo, P.; Volkov, S.; Vorobyev, A.; Wang, D.; Wang, M.; Yang, U.; Yang, Y.; Yonamine, R.; Zaganidis, N.; Zenoni, F.; Zhang, A.

    2018-02-01

    The CMS Collaboration plans to equip the very forward muon system with triple-GEM detectors that can withstand the environment of the High-Luminosity LHC. This project is at the final stages of R&D and moving to production. An unprecedented large area of several 100 m2 are to be instrumented with GEM detectors which will be produced in six different sites around the world. A common construction and quality control procedure is required to ensure the performance of each detector. The quality control steps will include optical inspection, cleaning and baking of all materials and parts used to build the detector, leakage current tests of the GEM foils, high voltage tests, gas leak tests of the chambers and monitoring pressure drop vs. time, gain calibration to know the optimal operation region of the detector, gain uniformity tests, and studying the efficiency, noise and tracking performance of the detectors in a cosmic stand using scintillators.

  11. Nighttime lidar water vapor mixing ratio profiling over Warsaw - impact of the relative humidity profile on cloud formation

    NASA Astrophysics Data System (ADS)

    Costa Surós, Montserrat; Stachlewska, Iwona S.

    2016-04-01

    A long-term study, assessing ground-based remote Raman lidar versus in-situ radiosounding has been conducted with the aim of improving the knowledge on the water content vertical profile through the atmosphere, and thus the conditions for cloud formation processes. Water vapor mixing ratio (WVMR) and relative humidity (RH) profiles were retrieved from ADR Lidar (PollyXT-type, EARLINET site in Warsaw). So far, more than 100 nighttime profiles averaged over 1h around midnight from July 2013 to December 2015 have been investigated. Data were evaluated with molecular extinctions calculated using two approximations: the US62 standard atmosphere and the radiosounding launched in Legionowo (12374). The calibration factor CH2O for lidar retrievals was obtained for each profile using the regression method and the profile method to determine the best calibration factor approximation to be used in the final WVMR and RH calculation. Thus, statistically representative results for comparisons between lidar WVMR median profiles obtained by calibrating using radiosounding profiles and using atmospheric synthetic profiles, all of them with the best calibration factor, will be presented. Finally, in order to constrain the conditions of cloud formation in function of the RH profile, the COS14 algorithm, capable of deriving cloud bases and tops by applying thresholds to the RH profiles, was applied to find the cloud vertical structure (CVS). The algorithm was former applied to radiosounding profiles at SGP-ARM site and tested against the CVS obtained from the Active Remote Sensing of Clouds (ARSCL) data. Similarly, it was applied for lidar measurements at the Warsaw measurement site.

  12. Record of decision, Bomarc Missile Accident Site, Mcguire AFB, New Jersey. Final report, November 1989-May 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, G.

    1992-11-20

    This document presents the selected final remedial action for the radioactive wastes at the BOMARC Missile Site, McGuire Air Force Base, New Jersey. The BOMARC Missile Site became contaminated in 1960 as the result of a fire which partially consumed a nuclear warhead-equipped BOMARC missile. The Air Force has decided to pursue excavation and Off-site Disposal of contaminated waste at a Department of Energy (DOE) disposal facility. This is a cost effective, permanent remedy, and is the environmentally preferred alternative. However, should the Air Force be denied the use of a DOE facility, or if other events should dramatically decreasemore » the cost effectiveness of this remedy, then as an interim remedy, the Air Force will maintain the BOMARC Missile Site in accordance with the NEPA No Action Alternative.« less

  13. EXECUTIVE SUMMARY OF STATE DATA RELATED TO ABANDONED CENTRALIZED AND COMMERCIAL DRILLING-FLUID DISPOSAL SITES IN LOUISIANA, NEW MEXICO, OKLAHOMA, AND TEXAS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    H. Seay Nance

    2003-03-01

    This 2003 Spring Semi-Annual Report contains a summary of the Final Technical Report being prepared for the Soil Remediation Requirements at Commercial and Centralized Drilling-Fluid Disposal (CCDD) Sites project funded by the United States Department of Energy under DOE Award No. DE-AC26-99BC15225. The summary describes (1) the objectives of the investigation, (2) a rationale and methodology of the investigation, (3) sources of data, assessment of data quality, and data availability, (4) examples of well documented centralized and commercial drilling-fluid disposal (CCDD) sites and other sites where drilling fluid was disposed of, and (5) examples of abandoned sites and measures undertakenmore » for their assessment and remediation. The report also includes most of the figures, tables, and appendices that will be included in the final report.« less

  14. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield weremore » determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.« less

  15. Ghostly events: A review of the namesakes of LLNL nuclear tests of the past few years

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, C.W.

    1993-02-01

    Beginning in Fiscal Year 1986, the LLNL named its tests at the Nevada Test Site for ghost towns and other historical place names in California and Nevada. The first test so named was GOLDSTONE conducted on December 28, 1985. The list of names was used until recently when a new set of names was adopted for use in FY-93 and later. The locations used for event names often had interesting histories of their own. Some sites have virtually disappeared, some are still identifiable ghost towns, some never were towns, and others are relatively recent or still inhabited locations. This papermore » is a compilation of brief histories of the locations for which tests were named. The towns mostly, but not entirely, date from the mining booms of about 1850 to the early twentieth century. Many of these communities had brief existences; populations ranged from a few hardy souls to several thousand, and amenities ranged from primitive to, in a few rare cases, opulent. The development tended to follow a similar pattern based on size and duration of activity, usually starting with a collection of tents, commonly known as rag-towns''. Generally even the small communities soon had a store, some sort of lodging, and a saloon and gambling hall. As towns grew, if they lasted long enough, they would often acquire a post office, more saloons and stores, better water supplies and transportation, more permanent hotels, sometimes a newspaper, and often a red-light district. This was followed finally by permanent residences and by churches and schools, possibly even a library, and the other trappings of a real community; the ultimate goal was to have a court house. Most sites, of course, went through boom and bust before the full cycle could be realized. These places are the remains of a fascinating and important part of our heritage.« less

  16. Ghostly events: A review of the namesakes of LLNL nuclear tests of the past few years

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, C.W.

    1993-02-01

    Beginning in Fiscal Year 1986, the LLNL named its tests at the Nevada Test Site for ghost towns and other historical place names in California and Nevada. The first test so named was GOLDSTONE conducted on December 28, 1985. The list of names was used until recently when a new set of names was adopted for use in FY-93 and later. The locations used for event names often had interesting histories of their own. Some sites have virtually disappeared, some are still identifiable ghost towns, some never were towns, and others are relatively recent or still inhabited locations. This papermore » is a compilation of brief histories of the locations for which tests were named. The towns mostly, but not entirely, date from the mining booms of about 1850 to the early twentieth century. Many of these communities had brief existences; populations ranged from a few hardy souls to several thousand, and amenities ranged from primitive to, in a few rare cases, opulent. The development tended to follow a similar pattern based on size and duration of activity, usually starting with a collection of tents, commonly known as ``rag-towns``. Generally even the small communities soon had a store, some sort of lodging, and a saloon and gambling hall. As towns grew, if they lasted long enough, they would often acquire a post office, more saloons and stores, better water supplies and transportation, more permanent hotels, sometimes a newspaper, and often a red-light district. This was followed finally by permanent residences and by churches and schools, possibly even a library, and the other trappings of a real community; the ultimate goal was to have a court house. Most sites, of course, went through boom and bust before the full cycle could be realized. These places are the remains of a fascinating and important part of our heritage.« less

  17. Borehole flowmeter logging for the accurate design and analysis of tracer tests.

    PubMed

    Basiricò, Stefano; Crosta, Giovanni B; Frattini, Paolo; Villa, Alberto; Godio, Alberto

    2015-04-01

    Tracer tests often give ambiguous interpretations that may be due to the erroneous location of sampling points and/or the lack of flow rate measurements through the sampler. To obtain more reliable tracer test results, we propose a methodology that optimizes the design and analysis of tracer tests in a cross borehole mode by using vertical borehole flow rate measurements. Experiments using this approach, herein defined as the Bh-flow tracer test, have been performed by implementing three sequential steps: (1) single-hole flowmeter test, (2) cross-hole flowmeter test, and (3) tracer test. At the experimental site, core logging, pumping tests, and static water-level measurements were previously carried out to determine stratigraphy, fracture characteristics, and bulk hydraulic conductivity. Single-hole flowmeter testing makes it possible to detect the presence of vertical flows as well as inflow and outflow zones, whereas cross-hole flowmeter testing detects the presence of connections along sets of flow conduits or discontinuities intercepted by boreholes. Finally, the specific pathways and rates of groundwater flow through selected flowpaths are determined by tracer testing. We conclude that the combined use of single and cross-borehole flowmeter tests is fundamental to the formulation of the tracer test strategy and interpretation of the tracer test results. © 2014, National Ground Water Association.

  18. Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-06-27

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  19. The National Visitor Use Monitoring methodology and final results for round 1

    Treesearch

    S.J. Zarnoch; E.M. White; D.B.K. English; Susan M. Kocis; Ross Arnold

    2011-01-01

    A nationwide, systematic monitoring process has been developed to provide improved estimates of recreation visitation on National Forest System lands. Methodology is presented to provide estimates of site visits and national forest visits based on an onsite sampling design of site-days and last-exiting recreationists. Stratification of the site days, based on site type...

  20. Public health assessment for McCormick and Baxter Creosoting Company (Portland), Portland, Multnomah County, Oregon, Region 10. Cerclis No. ORD009020603. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-06-13

    The McCormick and Baxter Creosoting site is located on the Willamette River in Portland, Oregon. ATSDR considers the site to have been a public health hazard for former plant workers because of past ingestion exposure to arsenic, creosote, pentachlorophenol, polychlorinated dibenzodioxins, and dibenzofurans at levels of public health concern. The site also poses an ongoing and future public health hazard because people might encounter hazardous chemicals along the shoreline on or near the site at levels that can damage the skin, as was reported to have happened to two boys. Finally, dioxin levels would pose a public health hazard ifmore » people subsist on crayfish and suckers contaminated with polychlorinated dibenzodioxins and dibenzofurans.« less

  1. Superfund Record of Decision (EPA Region 2): Love Canal (93rd Street School), Niagara County, City of Niagara Falls, NY. (Third remedial action), (amendment), May 1991. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Love Canal (93rd Street) site is an inactive hazardous waste site located in Niagara Falls, New York. The 19-acre 93rd Street School site, one of several operable units for the Love Canal Superfund site, is the focus of the Record of Decision (ROD). The fill material is reported to contain fly ash and BHC (a pesticide) waste. The ROD amends the 1988 ROD, and addresses final remediation of onsite contaminated soil through excavation and offsite disposal. The primary contaminants of concern affecting the soil are VOCs including toluene and xylenes; other organics including PAHs and pesticides; and metals includingmore » arsenic, chromium, and lead.« less

  2. KSC-2009-2207

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – ATK and NASA officials accompanied the Florida East Coast Railroad train carrying the booster segments for the Ares I-X test rocket on its route to NASA's Kennedy Space Center in Florida from Jacksonville, Fla. Seen here in the passenger car are, from left, ATK Vice President Space Launch Systems Charlie Precourt, a Florida East Coast Railroad representative, ATK Deputy Site Director in Florida Ted Shaffner, ATK Vice President Of Space Launch Propulsion Cary Ralston, NASA KSC Shuttle Launch Director Mike Leinbach, a Florida East Coast Railroad representative and ATK Ares I First Stage program Director Fred Brasfield. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  3. The use of mystery shopping for quality assurance evaluations of HIV/STI testing sites offering services to young gay and bisexual men.

    PubMed

    Bauermeister, José A; Pingel, Emily S; Jadwin-Cakmak, Laura; Meanley, Steven; Alapati, Deepak; Moore, Michael; Lowther, Matthew; Wade, Ryan; Harper, Gary W

    2015-10-01

    Young men who have sex with men (YMSM) are at increased risk for HIV and STI infection. While encouraging HIV and STI testing among YMSM remains a public health priority, we know little about the cultural competency of providers offering HIV/STI tests to YMSM in public clinics. As part of a larger intervention study, we employed a mystery shopper methodology to evaluate the LGBT cultural competency and quality of services offered in HIV and STI testing sites in Southeast Michigan (n = 43).We trained and deployed mystery shoppers (n = 5) to evaluate the HIV and STI testing sites by undergoing routine HIV/STI testing. Two shoppers visited each site, recording their experiences using a checklist that assessed 13 domains, including the clinic's structural characteristics and interactions with testing providers. We used the site scores to examine the checklist's psychometric properties and tested whether site evaluations differed between sites only offering HIV testing (n = 14) versus those offering comprehensive HIV/STI testing (n = 29). On average, site scores were positive across domains. In bivariate comparisons by type of testing site, HIV testing sites were more likely than comprehensive HIV/STI testing clinics to ascertain experiences of intimate partner violence, offer action steps to achieve safer sex goals, and provide safer sex education. The developed checklist may be used as a quality assurance indicator to measure HIV/STI testing sites' performance when working with YMSM. Our findings also underscore the need to bolster providers' provision of safer sex education and behavioral counseling within comprehensive HIV/STI testing sites.

  4. Biogeochemical patterns of intermittent streams over space and time as surface flows decrease

    NASA Astrophysics Data System (ADS)

    MacNeille, R. B.; Lohse, K. A.; Godsey, S.; McCorkle, E. P.; Parsons, S.; Baxter, C.

    2016-12-01

    Climate change in the western United States is projected to lead to earlier snowmelt, increasing fire risk and potentially transitioning perennial streams to intermittent ones. Differences between perennial and intermittent streams, especially the temporal and spatial patterns of carbon and nutrient dynamics during periods of drying, are understudied. We examined spatial and temporal patterns in surface water biogeochemistry in southwest Idaho and hypothesized that as streams dry, carbon concentrations would increase due to evapoconcentration and/or increased in-stream production. Furthermore, we expected that biogeochemical patterns of streams would become increasingly spatially heterogeneous with drying. Finally, we expected that these patterns would vary in response to fire. To test these hypotheses, we collected water samples every 50 meters from two intermittent streams, one burned and one unburned, in April, May and June, 2016 to determine surface water biogeochemistry. Results showed average concentrations of dissolved inorganic carbon (DIC) and dissolved organic carbon (DOC) increased 3-fold from April to June in the burned site compared to the unburned site where concentrations remained relatively constant. Interestingly, average concentrations of total nitrogen (TN) dropped substantially for the burned site over these three months, but only decreased slightly for the unburned site over the same time period. We also assessed changes in spatial correlation between the burned and unburned site: carbon concentrations were less spatially correlated at the unburned site than at the burned site. Scatterplot matrices of DIC values indicated that at a lag distance of 300 m in April and June, the unburned site had r-values of 0.7416 and 0.5975, respectively, while the burned site had r-values of 0.9468 and 0.8783, respectively. These initial findings support our hypotheses that carbon concentrations and spatial heterogeneity increased over time.

  5. Toward an Empirically-Based Parametric Explosion Spectral Model

    DTIC Science & Technology

    2011-09-01

    Site (NNSS, formerly the Nevada Test Site ) with data from explosions at the Semipalatinsk Test ...Nevada Test Site ) with data from explosions at the Semipalatinsk Test Site recorded at the Borovoye Geophysical Observatory (BRV). The BRV data archive...explosions at Semipalatinsk Test Site of the former Soviet Union (Figure 4). As an example, we plot the regional phase spectra of one of

  6. Geographic differences in vertical connectivity in the Caribbean coral Montastraea cavernosa despite high levels of horizontal connectivity at shallow depths.

    PubMed

    Serrano, X; Baums, I B; O'Reilly, K; Smith, T B; Jones, R J; Shearer, T L; Nunes, F L D; Baker, A C

    2014-09-01

    The deep reef refugia hypothesis proposes that deep reefs can act as local recruitment sources for shallow reefs following disturbance. To test this hypothesis, nine polymorphic DNA microsatellite loci were developed and used to assess vertical connectivity in 583 coral colonies of the Caribbean depth-generalist coral Montastraea cavernosa. Samples were collected from three depth zones (≤10, 15-20 and ≥25 m) at sites in Florida (within the Upper Keys, Lower Keys and Dry Tortugas), Bermuda, and the U.S. Virgin Islands. Migration rates were estimated to determine the probability of coral larval migration from shallow to deep and from deep to shallow. Finally, algal symbiont (Symbiodinium spp.) diversity and distribution were assessed in a subset of corals to test whether symbiont depth zonation might indicate limited vertical connectivity. Overall, analyses revealed significant genetic differentiation by depth in Florida, but not in Bermuda or the U.S. Virgin Islands, despite high levels of horizontal connectivity between these geographic locations at shallow depths. Within Florida, greater vertical connectivity was observed in the Dry Tortugas compared to the Lower or Upper Keys. However, at all sites, and regardless of the extent of vertical connectivity, migration occurred asymmetrically, with greater likelihood of migration from shallow to intermediate/deep habitats. Finally, most colonies hosted a single Symbiodinium type (C3), ruling out symbiont depth zonation of the dominant symbiont type as a structuring factor. Together, these findings suggest that the potential for shallow reefs to recover from deep-water refugia in M. cavernosa is location-specific, varying among and within geographic locations likely as a consequence of local hydrology. © 2014 John Wiley & Sons Ltd.

  7. A Comparison of Live Classroom Instruction and Internet-Based Lessons for a Preparatory Training Course Delivered to 4th Year Pharmacy Students

    NASA Astrophysics Data System (ADS)

    Nuffer, Wesley; Duke, Jodi

    2013-08-01

    To compare the effectiveness of an internet-based training series with a traditional live classroom session in preparing pharmacy students to oversee a diabetes management program in community settings. Two cohorts of students were identified that prepared by utilizing a recorded online training exclusively, and two separate cohorts of students prepared by receiving only live classroom instruction. All students in the four cohorts were given a survey to evaluate the training sessions, and results were analyzed using the analysis of variance statistical test (ANOVA). Preceptors at the sites who interacted with students in all four cohorts were surveyed to evaluate which students appeared more prepared; these data were compared using paired t tests. Final assessment data for students in all four cohorts were analyzed using ANOVA. There were statistical differences between the two live training groups, with the second group finding the training to be more beneficial for preparing them, feeling the training length was appropriate and preferring the live modality for delivery. The two internet training cohorts were similar except for perceptions regarding the length of the online training. Comparing responses from those students who received live training with those receiving internet instruction demonstrated a statistical difference with the live groups rating the trainings as more helpful in preparing them for the clinics, rating the training as necessary, and rating their confidence higher in seeing patients. Preceptors rated the live training statistically higher than online training in preparing students. There was no difference between groups on their final site assessments. Live classroom training appears to be superior to the recorded internet training in preparing pharmacy students to oversee a diabetes management program in community settings.

  8. Laboratory and clinical evaluation of on-site urine drug testing.

    PubMed

    Beck, Olof; Carlsson, Sten; Tusic, Marinela; Olsson, Robert; Franzen, Lisa; Hulten, Peter

    2014-11-01

    Products for on-site urine drug testing offer the possibility to perform screening for drugs of abuse directly at the point-of-care. This is a well-established routine in emergency and dependency clinics but further evaluation of performance is needed due to inherent limitations with the available products. Urine drug testing by an on-site product was compared with routine laboratory methods. First, on-site testing was performed at the laboratory in addition to the routine method. Second, the on-site testing was performed at a dependency clinic and urine samples were subsequently sent to the laboratory for additional analytical investigation. The on-site testing products did not perform with assigned cut-off levels. The subjective reading between the presence of a spot (i.e. negative test result) being present or no spot (positive result) was difficult in 3.2% of the cases, and occurred for all parameters. The tests performed more accurately in drug negative samples (specificity 96%) but less accurately for detecting positives (sensitivity 79%). Of all incorrect results by the on-site test the proportion of false negatives was 42%. The overall agreement between on-site and laboratory testing was 95% in the laboratory study and 98% in the clinical study. Although a high degree of agreement was observed between on-site and routine laboratory urine drug testing, the performance of on-site testing was not acceptable due to significant number of false negative results. The limited sensitivity of on-site testing compared to laboratory testing reduces the applicability of these tests.

  9. Geophysical Investigations Over the Archaeological site of Rirha (Morocco)

    NASA Astrophysics Data System (ADS)

    Senechal, G.; Rousset, D.; Callegarin, L.; Kbiri Alaoui, M.

    2007-05-01

    The roman site of Rirha has been evidenced in the 1920's and loosely studied until nowadays. Archeaological evidences show a pre-roman to medieval occupation of the site. Excavations have revealed thermae and other buildings while their context, rural villa or urban domus was still unknown. A new survey began in 2004, focusing on the pre-roman occupation of the site, as well as the characterization of the roman occupation. The zone of interest, a hill in a river loop, is about 11hectares. A comprehensive geophysical survey was out of reach, so geophysical tests have been carried on with two goals. The first one was to identify the suitable methods adapted to this, the second one was to use these preliminary results to distinguish between rural or urban settings for the roman site. The first survey has been conducted in April 2005, using conductivitymeter (Geonics EM38) in order to get informations about the spatial organization of the site. The selected zone was located in an unsurveyed part of the site. Resistivity maps show orthogonal structures, far from the known roman remains. This result supports the hypothesis of the site being a roman town and not a large farm or a villa. The second survey has been carried on in February 2006 and involved GPR and DC tomography, in very wet conditions. DC survey aimed at constraining the geological context of the site and at finding the remains of a large wall described by early authors. GPR experiment was primarily a test of the tool there and has been conducted on the previously studied area to get some depth information. The geological context has been studied by carrying on a 2D vertical section, 330 m long and 25 meters deep. showing a substratum of river deposit (sand, gravel, pebbles with possible clay layers) located at 8 to 10 m deep. Above this formation, we observe a very conductive layer interpreted as a clay formation (3 to 6 m thick) and finally, just below the surface, a laterally heterogeneous formation with rocks and adobe masonry. 2D DC sections succesfully located the remains of the surrounding wall of the site supporting even more the town hypothesis. GPR 3D results (250 MHz) are in agreement with conductivity maps but are of poor quality due to the very low resistivity of the soil.

  10. TX-100 manufacturing final project report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwill, Thomas D.; Berry, Derek S.

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. Themore » molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the three testing facilities.« less

  11. Addendum for the Groundwater Flow Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada, Revision 0 (page changes)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John McCord

    2007-05-01

    This document, which makes changes to Groundwater Flow Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada, S-N/99205--076, Revision 0 (June 2006) was prepared to address review comments of this final document by the Nevada Division of Environmental Protection (NDEP) in a letter dated July 19, 2006. The document includes revised pages that address NDEP review comments and comments from other document users. Change bars are included on these pages to identify where the text was revised. In addition to the revised pages, the following clarifications are made: • Onmore » Plate 1 (inserted in the back of the document), the ET Unit legend has been revised. The revised Plate 1 is included and replaces the original Plate 1. • Some of the Appendix D perturbation sensitivity analysis plots included on the CD for Sections D.3.1 and D.3.2 were not properly aligned. A revised CD is provided with all plots properly aligned.« less

  12. Effect of the Drilling Technique on Heat Generation During Osteotomy Preparation for Wide-Diameter Implants.

    PubMed

    El-Kholey, Khalid E; Elkomy, Aamna

    2016-12-01

    To test the hypothesis that there would be no difference in heat generation by reducing the number of drills during the implant site preparation relative to conventional drilling sequence. A total of 80 implant site preparations with 2 different diameters (5.6 and 6.2 mm) were performed on bovine ribs. Within the same diameter group, half of the preparations were performed by a simplified drilling procedure (pilot drill + final diameter drill) and the other half using the conventional drilling protocol, where multiple drills of increasing diameter were utilized. Heat production by different drilling techniques was evaluated by measuring the bone temperature using K-type thermocouple and a sensitive thermometer before and after each drill. Mean for maximum temperature increase during site preparation of the 5.6- and 6.2-mm implants was 2.20°C, and it was 2.55°C when the site was prepared by the simplified procedure, whereas it was 2.80°C and 2.95°C for the sites prepared by the conventional technique, respectively. No significant difference in temperature increase was found when implants of the 2 chosen diameters were prepared either by the conventional or simplified drilling procedure. The simplified drilling protocol produces similar amount of heat comparable to the conventional technique, which proved the initial hypothesis.

  13. The effect of Sphagnum farming on the greenhouse gas balance of donor and propagation areas, irrigation polders and commercial cultivation sites

    NASA Astrophysics Data System (ADS)

    Oestmann, Jan; Tiemeyer, Bärbel

    2017-04-01

    Drainage of peatlands for agriculture, forestry and peat extraction turned these landscapes into hotspots of greenhouse gas emissions. Climate protection now fosters rewetting projects to restore the natural peatland function as a sink of atmospheric carbon. One possible way to combine ecological and economical goals is Sphagnum farming, i.e. the cultivation of Sphagnum mosses as high-quality substrates for horticulture. This project scientifically evaluates the attempt of commercial Sphagnum farming on former peat extraction sites in north-western Germany. The exchange of carbon dioxide (CO2), methane (CH4) and nitrous oxide (N2O) of the whole peatland-based production chain comprising a donor mire, a propagation area, an irrigation polder and a cultivation site will be determined in a high temporal resolution for two years using manual chambers. This will allow evaluating the greenhouse gas balance of Sphagnum farming sites in comparison to near-natural sites and the potential of Sphagnum farming for restoring drained peatlands to sinks of atmospheric carbon. The influence of different irrigation techniques will also be tested. Additionally, selected plots will be equipped with open top chambers in order to examine the greenhouse gas exchange under potential future climate change conditions. Finally, a 13C pulse labeling experiment will make it possible to trace the newly sequestered CO2 in biomass, soil, respiration and dissolved organic carbon.

  14. Detection of site specific glycosylation in proteins using flow cytometry†

    PubMed Central

    Jayakumar, Deepak; Marathe, Dhananjay D.; Neelamegham, Sriram

    2009-01-01

    We tested the possibility that it is possible to express unique peptide probes on cell surfaces and detect site-specific glycosylation on these peptides using flow cytometry. Such development can enhance the application of flow cytometry to detect and quantify post-translational modifications in proteins. To this end, the N-terminal section of the human leukocyte glycoprotein PSGL-1 (P-selectin glycoprotein ligand-1) was modified to contain a poly-histidine tag followed by a proteolytic cleavage site. Amino acids preceding the cleavage site have a single O-linked glycosylation site. The recombinant protein called PSGL-1 (HT) was expressed on the surface of two mammalian cell lines, CHO and HL-60, using a lentiviral delivery approach. Results demonstrate that the N-terminal portion of PSGL-1 (HT) can be released from these cells by protease, and the resulting peptide can be readily captured and detected using cytometry-bead assays. Using this strategy, the peptide was immunoprecipitated onto beads bearing mAbs against either the poly-histidine sequence or the human PSGL-1. The carbohydrate epitope associated with the released peptide was detected using HECA-452 and CSLEX-1, monoclonal antibodies that recognize the sialyl Lewis-X epitope. Finally, the peptide released from cells could be separated and enriched using nickel chelate beads. Overall, such an approach that combines recombinant protein expression with flow cytometry, may be useful to quantify changes in site-specific glycosylation for basic science and clinical applications. PMID:19735085

  15. Contribution of physical modelling to climate-driven landslide hazard mapping: an alpine test site

    NASA Astrophysics Data System (ADS)

    Vandromme, R.; Desramaut, N.; Baills, A.; Hohmann, A.; Grandjean, G.; Sedan, O.; Mallet, J. P.

    2012-04-01

    The aim of this work is to develop a methodology for integrating climate change scenarios into quantitative hazard assessment and especially their precipitation component. The effects of climate change will be different depending on both the location of the site and the type of landslide considered. Indeed, mass movements can be triggered by different factors. This paper describes a methodology to address this issue and shows an application on an alpine test site. Mechanical approaches represent a solution for quantitative landslide susceptibility and hazard modeling. However, as the quantity and the quality of data are generally very heterogeneous at a regional scale, it is necessary to take into account the uncertainty in the analysis. In this perspective, a new hazard modeling method is developed and integrated in a program named ALICE. This program integrates mechanical stability analysis through a GIS software taking into account data uncertainty. This method proposes a quantitative classification of landslide hazard and offers a useful tool to gain time and efficiency in hazard mapping. However, an expertise approach is still necessary to finalize the maps. Indeed it is the only way to take into account some influent factors in slope stability such as heterogeneity of the geological formations or effects of anthropic interventions. To go further, the alpine test site (Barcelonnette area, France) is being used to integrate climate change scenarios into ALICE program, and especially their precipitation component with the help of a hydrological model (GARDENIA) and the regional climate model REMO (Jacob, 2001). From a DEM, land-cover map, geology, geotechnical data and so forth the program classifies hazard zones depending on geotechnics and different hydrological contexts varying in time. This communication, realized within the framework of Safeland project, is supported by the European Commission under the 7th Framework Programme for Research and Technological Development, Area "Environment", Activity 1.3.3.1 "Prediction of triggering and risk assessment for landslides".

  16. Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-07-01

    Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viablemore » CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. • If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where the total effective dose at the site exceeds final action levels (i.e., corrective action boundary). • Collect samples of investigation-derived waste, as needed, for waste management purposes.« less

  17. Site-index curves for young-growth ponderosa pine in northern Arizona

    Treesearch

    Charles O. Minor

    1964-01-01

    The productive capacity or site quality of an area enters into nearly every phase of forest management from regeneration to final harvest. No standards or measures of site quality have been developed specifically for ponderosa pine in the Southwest, which handicaps the forest manager. The major objective of the present study was to develop the basic site-index curves...

  18. Wave Resource Characterization at US Wave Energy Converter (WEC) Test Sites

    NASA Astrophysics Data System (ADS)

    Dallman, A.; Neary, V. S.

    2016-02-01

    The US Department of Energy's (DOE) Marine and Hydrokinetic energy (MHK) Program is supporting a diverse research and development portfolio intended to accelerate commercialization of the marine renewable industry by improving technology performance, reducing market barriers, and lowering the cost of energy. Wave resource characterization at potential and existing wave energy converter (WEC) test sites and deployment locations contributes to this DOE goal by providing a catalogue of wave energy resource characteristics, met-ocean data, and site infrastructure information, developed utilizing a consistent methodology. The purpose of the catalogue is to enable the comparison of resource characteristics among sites to facilitate the selection of test sites that are most suitable for a developer's device and that best meet their testing needs and objectives. It also provides inputs for the design of WEC test devices and planning WEC tests, including the planning of deployment and operations and maintenance. The first edition included three sites: the Pacific Marine Energy Center (PMEC) North Energy Test Site (NETS) offshore of Newport, Oregon, the Kaneohe Bay Naval Wave Energy Test Site (WETS) offshore of Oahu, HI, and a potential site offshore of Humboldt Bay, CA (Eureka, CA). The second edition was recently finished, which includes five additional sites: the Jennette's Pier Wave Energy Converter Test Site in North Carolina, the US Army Corps of Engineers (USACE) Field Research Facility (FRF), the PMEC Lake Washington site, the proposed PMEC South Energy Test Site (SETS), and the proposed CalWave Central Coast WEC Test Site. The operational sea states are included according to the IEC Technical Specification on wave energy resource assessment and characterization, with additional information on extreme sea states, weather windows, and representative spectra. The methodology and a summary of results will be discussed.

  19. A Survey Examining Photopatch Test and Phototest Methodologies of Contact Dermatologists in the United States: Platform for Developing A Consensus.

    PubMed

    Asemota, Eseosa; Crawford, Glen; Kovarik, Carrie; Brod, Bruce A

    There is currently no standardized protocol for photopatch testing and phototesting in the United States. Certain testing paramaters (such as chemicals tested, time between test application and irradiation, and time of final interpretation) vary from provider to provider. These variations may impact comparability and consistency of test results. The goal of our survey-based study was to outline the photopatch test and phototest protocols used by US contact dermatologists. The information obtained will aid in the development of a national consensus on testing methodologies. Based on a literature search conducted on differences in testing methodologies, we constructed a questionnaire. The survey was distributed at the American Contact Dermatitis Society annual meeting and via the American Contact Dermatitis Society Web site. Standard descriptive analysis was performed on data obtained. Of the 800 dermatologists contacted, 117 agreed to participate in the survey. Among these respondents, 64 (54.8%) conduct photopatch testing. Results of the survey are presented, and they confirm that a variety of techniques and testing materials are used. It would be beneficial to enlist a panel of expert contact dermatologists to create by formal consensus, using these research findings, a standard photopatch test protocol for use in this country.

  20. 76 FR 81840 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Direct final rule... Deletion of the Hipps Road Landfill Superfund Site (Site), located in Jacksonville, Florida, from the... than operation, maintenance, and five-year reviews have been completed. However, this deletion does not...

  1. 76 FR 41719 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Road Landfill Superfund Site AGENCY: Environmental Protection Agency. ACTION: Direct final rule... Deletion of the Hipps Road Landfill Superfund Site (Site), located in Jacksonville, Florida, from the... than operation, maintenance, and five-year reviews have been completed. However, this deletion does not...

  2. 10 CFR 960.3-2-2-5 - Formal site nomination.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-5 Formal site nomination. After the final..., consideration of the available evidence, evaluations, and the resultant findings for the guidelines of subparts...

  3. 10 CFR 960.3-2-2-5 - Formal site nomination.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-5 Formal site nomination. After the final..., consideration of the available evidence, evaluations, and the resultant findings for the guidelines of subparts...

  4. 10 CFR 960.3-2-2-5 - Formal site nomination.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-5 Formal site nomination. After the final..., consideration of the available evidence, evaluations, and the resultant findings for the guidelines of subparts...

  5. 10 CFR 960.3-2-2-5 - Formal site nomination.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Energy DEPARTMENT OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Implementation Guidelines § 960.3-2-2-5 Formal site nomination. After the final..., consideration of the available evidence, evaluations, and the resultant findings for the guidelines of subparts...

  6. Intraoperative language localization in multilingual patients with gliomas.

    PubMed

    Bello, Lorenzo; Acerbi, Francesco; Giussani, Carlo; Baratta, Pietro; Taccone, Paolo; Songa, Valeria; Fava, Marica; Stocchetti, Nino; Papagno, Costanza; Gaini, Sergio M

    2006-07-01

    Intraoperative localization of speech is problematic in patients who are fluent in different languages. Previous studies have generated various results depending on the series of patients studied, the type of language, and the sensitivity of the tasks applied. It is not clear whether languages are mediated by multiple and separate cortical areas or shared by common areas. Globally considered, previous studies recommended performing a multiple intraoperative mapping for all the languages in which the patient is fluent. The aim of this work was to study the feasibility of performing an intraoperative multiple language mapping in a group of multilingual patients with a glioma undergoing awake craniotomy for tumor removal and to describe the intraoperative cortical and subcortical findings in the area of craniotomy, with the final goal to maximally preserve patients' functional language. Seven late, highly proficient multilingual patients with a left frontal glioma were submitted preoperatively to a battery of tests to evaluate oral language production, comprehension, and repetition. Each language was tested serially starting from the first acquired language. Items that were correctly named during these tests were used to build personalized blocks to be used intraoperatively. Language mapping was undertaken during awake craniotomies by the use of an Ojemann cortical stimulator during counting and oral naming tasks. Subcortical stimulation by using the same current threshold was applied during tumor resection, in a back and forth fashion, and the same tests. Cortical sites essential for oral naming were found in 87.5% of patients, those for the first acquired language in one to four sites, those for the other languages in one to three sites. Sites for each language were distinct and separate. Number and location of sites were not predictable, being randomly and widely distributed in the cortex around or less frequently over the tumor area. Subcortical stimulations found tracts for the first acquired language in four patients and for the other languages in three patients. Three of these patients decreased their fluency immediately after surgery, affecting the first acquired language, which fully recovered in two patients and partially in one. The procedure was agile and well tolerated by the patients. These findings show that multiple cortical and subcortical language mapping during awake craniotomy for tumor removal is a feasible procedure. They support the concept that intraoperative mapping should be performed for all the languages in which the patient is fluent in to preserve functional integrity.

  7. Integrated genetic and epigenetic prediction of coronary heart disease in the Framingham Heart Study.

    PubMed

    Dogan, Meeshanthini V; Grumbach, Isabella M; Michaelson, Jacob J; Philibert, Robert A

    2018-01-01

    An improved method for detecting coronary heart disease (CHD) could have substantial clinical impact. Building on the idea that systemic effects of CHD risk factors are a conglomeration of genetic and environmental factors, we use machine learning techniques and integrate genetic, epigenetic and phenotype data from the Framingham Heart Study to build and test a Random Forest classification model for symptomatic CHD. Our classifier was trained on n = 1,545 individuals and consisted of four DNA methylation sites, two SNPs, age and gender. The methylation sites and SNPs were selected during the training phase. The final trained model was then tested on n = 142 individuals. The test data comprised of individuals removed based on relatedness to those in the training dataset. This integrated classifier was capable of classifying symptomatic CHD status of those in the test set with an accuracy, sensitivity and specificity of 78%, 0.75 and 0.80, respectively. In contrast, a model using only conventional CHD risk factors as predictors had an accuracy and sensitivity of only 65% and 0.42, respectively, but with a specificity of 0.89 in the test set. Regression analyses of the methylation signatures illustrate our ability to map these signatures to known risk factors in CHD pathogenesis. These results demonstrate the capability of an integrated approach to effectively model symptomatic CHD status. These results also suggest that future studies of biomaterial collected from longitudinally informative cohorts that are specifically characterized for cardiac disease at follow-up could lead to the introduction of sensitive, readily employable integrated genetic-epigenetic algorithms for predicting onset of future symptomatic CHD.

  8. 40 CFR 53.30 - General provisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... more information about the site. Any such pre-test approval of a test site by the EPA shall indicate... Methods and Reference Methods § 53.30 General provisions. (a) Determination of comparability. The test... discretion of the Administrator. (b) Selection of test sites. (1) Each test site shall be in an area which...

  9. 40 CFR 53.30 - General provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... more information about the site. Any such pre-test approval of a test site by the EPA shall indicate... Methods and Reference Methods § 53.30 General provisions. (a) Determination of comparability. The test... discretion of the Administrator. (b) Selection of test sites. (1) Each test site shall be in an area which...

  10. 40 CFR 53.30 - General provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... more information about the site. Any such pre-test approval of a test site by the EPA shall indicate... Methods and Reference Methods § 53.30 General provisions. (a) Determination of comparability. The test... discretion of the Administrator. (b) Selection of test sites. (1) Each test site shall be in an area which...

  11. 40 CFR 53.30 - General provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... more information about the site. Any such pre-test approval of a test site by the EPA shall indicate... Methods and Reference Methods § 53.30 General provisions. (a) Determination of comparability. The test... discretion of the Administrator. (b) Selection of test sites. (1) Each test site shall be in an area which...

  12. 40 CFR 53.30 - General provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... more information about the site. Any such pre-test approval of a test site by the EPA shall indicate... Methods and Reference Methods § 53.30 General provisions. (a) Determination of comparability. The test... discretion of the Administrator. (b) Selection of test sites. (1) Each test site shall be in an area which...

  13. 78 FR 48909 - SGS North America, Inc. (formerly SGS U.S. Testing Company, Inc.)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ... of one test site. OSHA also recognizes the removal of one test site and 13 test standards from SGS's... expand its recognition to include one additional test site located at 620 Old Peachtree Road, Suwanee, GA... this move, SGS requests the removal of one test site, located at 291 Fairfield Avenue, Fairfield, NJ...

  14. Investigation of thermolytic hydrogen generation rate of tank farm simulated and actual waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martino, C.; Newell, D.; Woodham, W.

    To support resolution of Potential Inadequacies in the Safety Analysis for the Savannah River Site (SRS) Tank Farm, Savannah River National Laboratory conducted research to determine the thermolytic hydrogen generation rate (HGR) with simulated and actual waste. Gas chromatography methods were developed and used with air-purged flow systems to quantify hydrogen generation from heated simulated and actual waste at rates applicable to the Tank Farm Documented Safety Analysis (DSA). Initial simulant tests with a simple salt solution plus sodium glycolate demonstrated the behavior of the test apparatus by replicating known HGR kinetics. Additional simulant tests with the simple salt solutionmore » excluding organics apart from contaminants provided measurement of the detection and quantification limits for the apparatus with respect to hydrogen generation. Testing included a measurement of HGR on actual SRS tank waste from Tank 38. A final series of measurements examined HGR for a simulant with the most common SRS Tank Farm organics at temperatures up to 140 °C. The following conclusions result from this testing.« less

  15. Evaluation of Final Radiological Conditions at Areas of the Niagara Falls Storage Site Remediated under the Formerly Utilized Sites Remedial Action Program -12184

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clayton, Christopher; Kothari, Vijendra; Starr, Ken

    2012-02-26

    The U. S. Department of Energy (DOE) methods and protocols allow evaluation of remediation and final site conditions to determine if remediated sites remain protective. Two case studies are presented that involve the Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs), which are being remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). These properties are a part of the former Lake Ontario Ordnance Works (LOOW). In response to stakeholders concerns about whether certain remediated NFSS VPs were putting them at risk, DOE met with stakeholders and agreed to evaluate protectiveness. Documentation in the DOE records collectionmore » adequately described assessed and final radiological conditions at the completed VPs. All FUSRAP wastes at the completed sites were cleaned up to meet DOE guidelines for unrestricted use. DOE compiled the results of the investigation in a report that was released for public comment. In conducting the review of site conditions, DOE found that stakeholders were also concerned about waste from the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) that was handled at LOOW. DOE agreed to determine if SPRU waste remained at that needed to be remediated. DOE reviewed records of waste characterization, historical handling locations and methods, and assessment and remediation data. DOE concluded that the SPRU waste was remediated on the LOOW to levels that pose no unacceptable risk and allow unrestricted use and unlimited exposure. This work confirms the following points as tenets of an effective long-term surveillance and maintenance (LTS&M) program: Stakeholder interaction must be open and transparent, and DOE must respond promptly to stakeholder concerns. DOE, as the long-term custodian, must collect and preserve site records in order to demonstrate that remediated sites pose no unacceptable risk. DOE must continue to maintain constructive relationships with the U.S. Army Corps of Engineers and state and federal regulators.« less

  16. An ArcGIS decision support tool for artificial reefs site selection (ArcGIS ARSS)

    NASA Astrophysics Data System (ADS)

    Stylianou, Stavros; Zodiatis, George

    2017-04-01

    Although the use and benefits of artificial reefs, both socio-economic and environmental, have been recognized with research and national development programmes worldwide their development is rarely subjected to a rigorous site selection process and the majority of the projects use the traditional (non-GIS) approach, based on trial and error mode. Recent studies have shown that the use of Geographic Information Systems, unlike to traditional methods, for the identification of suitable areas for artificial reefs siting seems to offer a number of distinct advantages minimizing possible errors, time and cost. A decision support tool (DSS) has been developed based on the existing knowledge, the multi-criteria decision analysis techniques and the GIS approach used in previous studies in order to help the stakeholders to identify the optimal locations for artificial reefs deployment on the basis of the physical, biological, oceanographic and socio-economic features of the sites. The tool provides to the users the ability to produce a final report with the results and suitability maps. The ArcGIS ARSS support tool runs within the existing ArcMap 10.2.x environment and for the development the VB .NET high level programming language has been used along with ArcObjects 10.2.x. Two local-scale case studies were conducted in order to test the application of the tool focusing on artificial reef siting. The results obtained from the case studies have shown that the tool can be successfully integrated within the site selection process in order to select objectively the optimal site for artificial reefs deployment.

  17. The Use of Mystery Shopping for Quality Assurance Evaluations of HIV/STI Testing Sites Offering Services to Young Gay and Bisexual Men

    PubMed Central

    Bauermeister, José A.; Pingel, Emily S.; Jadwin-Cakmak, Laura; Meanley, Steven; Alapati, Deepak; Moore, Michael; Lowther, Matthew; Wade, Ryan; Harper, Gary W.

    2015-01-01

    Young men who have sex with men (YMSM) are at increased risk for HIV and STI infection. While encouraging HIV and STI testing among YMSM remains a public health priority, we know little about the cultural competency of providers offering HIV/STI tests to YMSM in public clinics. As part of a larger intervention study, we employed a mystery shopper methodology to evaluate the LGBT cultural competency and quality of services offered in HIV and STI testing sites in Southeast Michigan (n = 43).We trained and deployed mystery shoppers (n = 5) to evaluate the HIV and STI testing sites by undergoing routine HIV/STI testing. Two shoppers visited each site, recording their experiences using a checklist that assessed 13 domains, including the clinic’s structural characteristics and interactions with testing providers. We used the site scores to examine the checklist’s psychometric properties and tested whether site evaluations differed between sites only offering HIV testing (n = 14) versus those offering comprehensive HIV/STI testing (n = 29). On average, site scores were positive across domains. In bivariate comparisons by type of testing site, HIV testing sites were more likely than comprehensive HIV/STI testing clinics to ascertain experiences of intimate partner violence, offer action steps to achieve safer sex goals, and provide safer sex education. The developed checklist may be used as a quality assurance indicator to measure HIV/STI testing sites’ performance when working with YMSM. Our findings also underscore the need to bolster providers’ provision of safer sex education and behavioral counseling within comprehensive HIV/STI testing sites. PMID:26303197

  18. Detection of surface temperature from LANDSAT-7/ETM+

    NASA Astrophysics Data System (ADS)

    Suga, Y.; Ogawa, H.; Ohno, K.; Yamada, K.

    2003-12-01

    Hiroshima Institute of Technology (HIT) in Japan has established a LANDSAT-7 Ground Station in cooperation with NASDA for receiving and processing the ETM+ data on March 15 th, 2000 in Japan. The authors performed a verification study on the surface temperature derived from thermal infrared band image data of LANDSAT 7/Enhanced Thematic Mapper Plus (ETM+) for the estimation of temperatures around Hiroshima city and bay area in the western part of Japan as a test site. As to the thermal infrared band, the approximate functions for converting the spectral radiance into the surface temperature are estimated by considering both typical surface temperatures measured by the simultaneous field survey with the satellite observation and the spectral radiance observed by ETM+ band 6 (10.40-12.50μm), and then the estimation of the surface temperature distribution around the test site was examined.In this study, the authors estimated the surface temperature distribution equivalent to the land cover categories around the test site for establishing a guideline of surface temperature detection by LANDSAT7/ETM+ data. As the result of comparison of the truth data and the estimated surface temperature, the correlation coefficients of the approximate function referred to the truth data are from 0.9821 to 0.9994, and the differences are observed from +0.7 to -1.5°C in summer, from +0.4 to -0.9 *C in autumn, from -1.6 to -3.4°C in winter and from +0.5 to -0.5C in spring season respectively. It is clearly found that the estimation of surface temperature based on the approximate functions for converting the spectral radiance into the surface temperature referred to the truth data is improved over the directly estimated surface temperature obtained from satellite data. Finally, the successive seasonal change of surface temperature distribution pattern of the test site is precisely detected with the temperature legend of 0 to 80'C derived from LANDSAT-7/ETM+ band 6 image data for the thermal environment monitoring. 2003 COSPAR. Published by Elsevier Ltd.

  19. Site testing in Colombia : Identification of the least-worst places for optical telescopes

    NASA Astrophysics Data System (ADS)

    Pinzón, G.

    2017-07-01

    With the aim of identifying a set of least-worst sites for astronomical observations in Colombia we used a novel algorithm for the computation of the number of clear nights over an extended region covering Colombia and the western part of Venezuela. This algorithm compares the brightness temperatures of five years of GOES images with reference temperature values obtained from long-term records of monthly temperatures at ground and at heights of 8, 9 and 10 kilometers. Our predictions were validated with cloud cover information from the log-books of the Observatorio Nacional de Llano del Hato in Venezuela. Short and sporadic expeditions to four of those sites were also done from 2013 to 2015 in order to conduct measurements in-situ of temperature and humidity along the night, seeing, sky brightness and atmospheric extinction using basic instrumentation. The final conclusions have been derived solely on the basis of the actually visited sites. It was found that at Cañón del río Nevado the Seeing during the nights was more stable with rms=0.59'' and then a suitable and extended region (of almost 30 km) for the location of optical telescopes aimed to enhance astronomy research and outreach in the country.

  20. The relative contribution of target-site mutations in complex acaricide resistant phenotypes as assessed by marker assisted backcrossing in Tetranychus urticae.

    PubMed

    Riga, Maria; Bajda, Sabina; Themistokleous, Christos; Papadaki, Stavrini; Palzewicz, Maria; Dermauw, Wannes; Vontas, John; Leeuwen, Thomas Van

    2017-08-23

    The mechanisms underlying insecticide and acaricide resistance in insects and mites are often complex, including additive effects of target-site insensitivity, increased metabolism and transport. The extent to which target-site resistance mutations contribute to the resistance phenotype is, however, not well studied. Here, we used marker-assisted backcrossing to create 30 congenic lines carrying nine mutations (alone, or in combination in a few cases) associated with resistance to avermectins, pyrethroids, mite growth inhibitors and mitochondrial complex III inhibitors (QoI) in a polyphagous arthropod pest, the spider mite Tetranychus urticae. Toxicity tests revealed that mutations in the voltage-gated sodium channel, chitin synthase 1 and cytochrome b confer high levels of resistance and, when fixed in a population, these mutations alone can result in field failure of acaricide treatment. In contrast, although we confirmed the implication of mutations in glutamate-gated chloride channels in abamectin and milbemectin insensitivity, these mutations do not lead to the high resistance levels that are often reported in abamectin resistant strains of T. urticae. Overall, this study functionally validates reported target-site resistance mutations in T. urticae, by uncoupling them from additional mechanisms, allowing to finally investigate the strength of the conferred phenotype in vivo.

  1. Prediction of human disease-associated phosphorylation sites with combined feature selection approach and support vector machine.

    PubMed

    Xu, Xiaoyi; Li, Ao; Wang, Minghui

    2015-08-01

    Phosphorylation is a crucial post-translational modification, which regulates almost all cellular processes in life. It has long been recognised that protein phosphorylation has close relationship with diseases, and therefore many researches are undertaken to predict phosphorylation sites for disease treatment and drug design. However, despite the success achieved by these approaches, no method focuses on disease-associated phosphorylation sites prediction. Herein, for the first time the authors propose a novel approach that is specially designed to identify associations between phosphorylation sites and human diseases. To take full advantage of local sequence information, a combined feature selection method-based support vector machine (CFS-SVM) that incorporates minimum-redundancy-maximum-relevance filtering process and forward feature selection process is developed. Performance evaluation shows that CFS-SVM is significantly better than the widely used classifiers including Bayesian decision theory, k nearest neighbour and random forest. With the extremely high specificity of 99%, CFS-SVM can still achieve a high sensitivity. Besides, tests on extra data confirm the effectiveness and general applicability of CFS-SVM approach on a variety of diseases. Finally, the analysis of selected features and corresponding kinases also help the understanding of the potential mechanism of disease-phosphorylation relationships and guide further experimental validations.

  2. Final Hazard Categorization for the Remediation of the 118-D-1, 118-D-2, 118-D-3, 118-H-1, 118-H-2, and 118-H-3 Solid Waste Burial Grounds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. J. Rodovsky

    2006-12-06

    This report presents the final hazard categorization (FHC) for the remediation of the 118-D-1, 118-D-2, and 118-D-3 Burial Grounds located within the 100-D/DR Area of the Hanford Site and the 118-H-1, 118-H-2, and 118-H-3 Burial Grounds located within the 100-H Area of the Hanford Site.

  3. Final Hazard Categorization for the Remediation of the 118-D-1, 118-D-2, 118-D-3, 118-H-1, 118-H-2, and 118-H-3 Solid Waste Burial Grounds

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. J. Rodovsky

    2007-04-12

    This report presents the final hazard categorization (FHC) for the remediation of the 118-D-1, 118-D-2, and 118-D-3 Burial Grounds located within the 100-D/DR Area of the Hanford Site and the 118-H-1, 118-H-2, and 118-H-3 Burial Grounds located within the 100-H Area of the Hanford Site.

  4. Commission decision on the Department of Water Resources' Application for Certification for the Bottle Rock Geothermal Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-11-01

    The Application for Certification for the construction of a 55 MW geothermal power plant and related facilities in Lake County was approved subject to terms identified in the Final Decision. The following are covered: findings on compliance with statutory site-certification requirements; final environmental impact report; procedural steps; evidentiary bases; need, environmental resources; public health and safety; plant and site safety and reliability; socioeconomic, land use, and cultural concerns, and transmission tap line. (MHR)

  5. Safety performance functions for intersections : final report, December 2009.

    DOT National Transportation Integrated Search

    2009-12-01

    Road safety management activities include screening the network for sites with a potential for safety improvement (Network : Screening), diagnosing safety problems at specific sites, and evaluating the safety effectiveness of implemented : countermea...

  6. Forest type influences transmission of Phytophthora ramorum in California oak woodlands.

    PubMed

    Davidson, Jennifer M; Patterson, Heather A; Wickland, Allison C; Fichtner, Elizabeth J; Rizzo, David M

    2011-04-01

    The transmission ecology of Phytophthora ramorum from bay laurel (Umbellularia californica) leaves was compared between mixed-evergreen and redwood forest types throughout winter and summer disease cycles in central, coastal California. In a preliminary multisite study, we found that abscission rates of infected leaves were higher at mixed-evergreen sites. In addition, final infection counts were slightly higher at mixed-evergreen sites or not significantly different than at redwood sites, in part due to competition from other foliar pathogens at redwood sites. In a subsequent, detailed study of paired sites where P. ramorum was the main foliar pathogen, summer survival of P. ramorum in bay laurel leaves was lower in mixed-evergreen forest due to lower recovery from infected attached leaves and higher abscission rates of infected leaves. Onset of inoculum production and new infections of bay laurel leaves occurred later in mixed-evergreen forest. Mean inoculum levels in rainwater and final infection counts on leaves were higher in redwood forest. Based on these two studies, lower summer survival of reservoir inoculum in bay laurel leaves in mixed-evergreen forest may result in delayed onset of both inoculum production and new infections, leading to slower disease progress in the early rainy season compared with redwood forest. Although final infection counts also will depend on other foliar pathogens and disease history, in sites where P. ramorum is the main foliar pathogen, these transmission patterns suggest higher rates of disease spread in redwood forests during rainy seasons of short or average length.

  7. Population Estimates for Chum Salmon Spawning in the Mainstem Columbia River, 2002 Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rawding, Dan; Hillson, Todd D.

    2003-11-15

    Accurate and precise population estimates of chum salmon (Oncorhynchus keta) spawning in the mainstem Columbia River are needed to provide a basis for informed water allocation decisions, to determine the status of chum salmon listed under the Endangered Species Act, and to evaluate the contribution of the Duncan Creek re-introduction program to mainstem spawners. Currently, mark-recapture experiments using the Jolly-Seber model provide the only framework for this type of estimation. In 2002, a study was initiated to estimate mainstem Columbia River chum salmon populations using seining data collected while capturing broodstock as part of the Duncan Creek re-introduction. The fivemore » assumptions of the Jolly-Seber model were examined using hypothesis testing within a statistical framework, including goodness of fit tests and secondary experiments. We used POPAN 6, an integrated computer system for the analysis of capture-recapture data, to obtain maximum likelihood estimates of standard model parameters, derived estimates, and their precision. A more parsimonious final model was selected using Akaike Information Criteria. Final chum salmon escapement estimates and (standard error) from seining data for the Ives Island, Multnomah, and I-205 sites are 3,179 (150), 1,269 (216), and 3,468 (180), respectively. The Ives Island estimate is likely lower than the total escapement because only the largest two of four spawning sites were sampled. The accuracy and precision of these estimates would improve if seining was conducted twice per week instead of weekly, and by incorporating carcass recoveries into the analysis. Population estimates derived from seining mark-recapture data were compared to those obtained using the current mainstem Columbia River salmon escapement methodologies. The Jolly-Seber population estimate from carcass tagging in the Ives Island area was 4,232 adults with a standard error of 79. This population estimate appears reasonable and precise but batch marks and lack of secondary studies made it difficult to test Jolly-Seber assumptions, necessary for unbiased estimates. We recommend that individual tags be applied to carcasses to provide a statistical basis for goodness of fit tests and ultimately model selection. Secondary or double marks should be applied to assess tag loss and male and female chum salmon carcasses should be enumerated separately. Carcass tagging population estimates at the two other sites were biased low due to limited sampling. The Area-Under-the-Curve escapement estimates at all three sites were 36% to 76% of Jolly-Seber estimates. Area-Under-the Curve estimates are likely biased low because previous assumptions that observer efficiency is 100% and residence time is 10 days proved incorrect. If managers continue to rely on Area-Under-the-Curve to estimate mainstem Columbia River spawners, a methodology is provided to develop annual estimates of observer efficiency and residence time, and to incorporate uncertainty into the Area-Under-the-Curve escapement estimate.« less

  8. Yield and Depth of Burial Hydrodynamic Calculations in Granodiorite: Implications for the North Korean Test Site

    DTIC Science & Technology

    2011-09-01

    the existence of a test site body wave magnitude (mb) bias between U. S. and the former Soviet Union test sites in Nevada and Semipalatinsk . The use...YIELD AND DEPTH OF BURIAL HYDRODYNAMIC CALCULATIONS IN GRANODIORITE:IMPLICATIONS FOR THE NORTH KOREAN TEST SITE Esteban Rougier, Christopher R...Korean test site and the May 2009 test . When compared to the Denny and Johnson (1991) and to the Heard and Ackerman (1967) cavity radius scaling models

  9. 76 FR 56982 - Announcement of Federal Underground Injection Control (UIC) Class VI Program for Carbon Dioxide (CO2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... and Administration priorities for developing and deploying CCS projects in the next few years as... VI rule finalized on December 10, 2010. Direct Federal implementation of the final Class VI... on the final Class VI rule, visit the Underground Injection Control Geologic Sequestration Web site...

  10. Role of EIS in Materials and Coatings Selection for NASA's Launch Facilities

    NASA Technical Reports Server (NTRS)

    Calle, Luz Marina

    2004-01-01

    Corrosion studies began at NASA's John F. Kennedy Space Center (KSC) in 1966, during the Gemini/Apollo Programs, with the evaluation of long-term anti-corrosion coatings for carbon steel structures. NASAIKSC's Atmospheric Exposure Test Site was established at that time on the beach near the launch pad. In the years that followed, numerous studies at the site have identified materials, coatings, and maintenance procedures for launch hardware and equipment exposed to the highly corrosive environment at the launch pad. The atmosphere at the launch pad is highly corrosive due to the proximity of the Atlantic Ocean, high heat from rocket exhaust, and since the introduction of the Space Shuttle, the acidic combustion products of the Solid Rocket Boosters (SRBs). Currently, NASAIKSC maintains about $2 billion worth of unique equipment and facilities, not including the orbiters, each valued at about $1.8 billion. Among the items: two launch complexes, two crawler transporters, three mobile launch platforms, and specialized testing equipment. Atmospheric exposure provides very valuable data but it takes a long time and relies on human visual inspection. NASA Technical Standard for Protective Coatings requires 18 months of good performance at the Atmospheric Exposure Test Site for preliminary approval and continued good performance for 5 years for final approval of a coating system. The use of electrochemical impedance spectroscopy (EIS) was introduced at KSC in 1989 as a supplement to the traditional dc electrochemical techniques and atmospheric exposure studies. This paper presents and overview of several projects in which EIS was used in order to select materials and coatings to be used at NASA's launch facilities [1-2].

  11. Genetic and environmental variation in methane emissions of sheep at pasture.

    PubMed

    Robinson, D L; Goopy, J P; Hegarty, R S; Oddy, V H; Thompson, A N; Toovey, A F; Macleay, C A; Briegal, J R; Woodgate, R T; Donaldson, A J; Vercoe, P E

    2014-10-01

    A total of 2,600 methane (CH4) and 1,847 CO2 measurements of sheep housed for 1 h in portable accumulation chambers (PAC) were recorded at 5 sites from the Australian Sheep CRC Information Nucleus, which was set up to test leading young industry sires for an extensive range of current and novel production traits. The final validated dataset had 2,455 methane records from 2,279 animals, which were the progeny of 187 sires and 1,653 dams with 7,690 animals in the pedigree file. The protocol involved rounding up animals from pasture into a holding paddock before the first measurement on each day and then measuring in groups of up to 16 sheep over the course of the day. Methane emissions declined linearly (with different slopes for each site) with time since the sheep were drafted into the holding area. After log transformation, estimated repeatability (rpt) and heritability (h(2)) of liveweight-adjusted CH4 emissions averaged 25% and 11.7%, respectively, for a single 1-h measurement. Sire × site interactions were small and nonsignificant. Correlations between EBV for methane emissions and Sheep Genetics Australia EBV for production traits were used as approximations to genetic correlations. Apart from small positive correlations with weaning and yearling weights (r = 0.21-0.25, P < 0.05), there were no significant relationships between production trait and methane EBV (calculated from a model adjusting for liveweight by fitting separate slopes for each site). To improve accuracy, future protocols should use the mean of 2 (rpt = 39%, h(2) = 18.6%) or 3 (rpt = 48%, h(2) = 23.2%) PAC measurements. Repeat tests under different pasture conditions and time of year should also be considered, as well as protocols measuring animals directly off pasture instead of rounding them up in the morning. Reducing the time in the PAC from 1 h to 40 min would have a relatively small effect on overall accuracy and partly offset the additional time needed for more tests per animal. Field testing in PAC has the potential to provide accurate comparisons of animal and site methane emissions, with potentially lower cost/increased accuracy compared to alternatives such as SF6 tracers or open path lasers. If similar results are obtained from tests with different protocols/seasonal conditions, use of PAC measurements in a multitrait selection index with production traits could potentially reduce methane emissions from Australian sheep for the same production level.

  12. Gravity survey of the Nevada Test Site and vicinity, Nye, Lincoln, and Clark Counties, Nevada--interim report

    USGS Publications Warehouse

    Healy, D.L.; Miller, C.H.

    1962-01-01

    The gravity survey of the Nevada Test Site and contiguous areas of southern Nevada and southeastern California (fig. 1) has been made by the U.S. Geological Survey on behalf of the U.S. Atomic Energy Commission.The objective of this study is to delineate and interpret gravity anomalies and regional trends so that the configuration and depth of the buried erosional surface of the Paleozoic rocks may be determined. This buried surface is of utmost importance in understanding the geologic history of the Nevada Test Site region, the thickness and distribution of the overlying volcanic rocks and alluvium, and the movement of ground water. The Paleozoic rocks cause positive gravity anomalies where they outcrop or occur near the surface and negative anomalies where they are buried in valleys or capped by low-density Tertiary volcanic rocks. Gravity trends which extend over the entire area provide a basis for computing the regional gravity gradient. The regional gravity gradient must be removed from the data for geologic interpretation of the paleotopographic surface in any limited area. Knowledge of the thickness of low-density material overlying the paleotopographic surface is useful in several ways. Proposed underground test sites, such as drill holes and tunnels, may be evaluated in terms of rock unit thickness and alluvial cover requirements. Recent work by the Water Resources Division of the U.S. Geological Survey has demonstrated ground-water movement through the Paleozoic rocks in the vicinity of the Nevada Test Site. Therefore, knowledge of the position of buried Paleozoic rocks is important in evaluating (a) the rate and direction of flow of the ground water, (b) ground-water supplies for domestic and industrial uses, and (c) the possibility of radioactive contamination of ground water. Finally, regional gravity trends and paleotopography are useful in working out the structural history of the area in connection with geologic studies now in progress. The purpose of this interim report is to present the major part of the gravity data obtained as of December 31, 1961. The data are presented as a complete Bouguer gravity anomaly map. Although the gravity contours are somewhat generalized because the map has a scale of 1:250,000 and a contour interval of 5 milligals, the largest anomalies are adequately delineated. Preliminary results of this gravity survey have been reported by Wilmarth and others, 1960, and by Diment and others, 1959 and 1960.

  13. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  14. Test and evaluation of Japanese GPR-EMI dual sensor systems at Benkovac test site in Croatia

    NASA Astrophysics Data System (ADS)

    Ishikawa, J.; Furuta, K.; Pavković, Nikola

    2007-04-01

    This paper presents an experimental design and the evaluation result of a trial that were carried out from 1 February to 9 March 2006 using real PMA-1A and PMA-2 landmines at the Benkovac test site in Croatia. The objective of the Croatia- Japan joint trial is to evaluate dual sensor systems, which use both ground penetrating radar (GPR) and electromagnetic inductive (EMI) sensors. A comparative trial was also carried out by Croatian deminers using an existing EMI sensor, i.e., a metal detector (MD). The trial aims at evaluating differences in performance between dual sensors and MDs, especially in terms of discrimination of landmines from metal fragments and extension of detectable range in the depth direction. Devices evaluated here are 4 prototypes of anti-personnel landmine detection systems developed under a project of the Japan Science and Technology Agency (JST), the supervising authority of which is the Ministry of Education, Culture, Sports, Science and Technology (MEXT). The prototypes provide operators with subsurface images, and final decision whether a shadow in the image is a real landmine or not is left to the operator. This is similar to the way that medical doctors find cancer by reading CT images. Since operators' pre-knowledge of locations of buried targets significantly influences the test result, three test lanes, which have 3 different kinds of soils, have been designed to be suitable for blind tests. The result showed that the dual sensor systems have a potential to discriminate landmines from metal fragments and that probability of detection for small targets in mineralized soils can be improved by using GPR.

  15. Acceptance testing for PACS: from methodology to design to implementation

    NASA Astrophysics Data System (ADS)

    Liu, Brent J.; Huang, H. K.

    2004-04-01

    Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.

  16. IRIS Toxicological Review of Methanol (Noncancer) (Final Report)

    EPA Science Inventory

    EPA conducted a peer review and public comment of the scientific basis supporting the human health hazard and dose-response assessment of Methanol (noncancer) , this is finalized and posted on the IRIS Web site.

  17. Seismic Monitoring Prior to and During DFDP-2 Drilling, Alpine Fault, New Zealand: Matched-Filter Detection Testing and the Real-Time Monitoring System

    NASA Astrophysics Data System (ADS)

    Boese, C. M.; Chamberlain, C. J.; Townend, J.

    2015-12-01

    In preparation for the second stage of the Deep Fault Drilling Project (DFDP) and as part of related research projects, borehole and surface seismic stations were installed near the intended DFDP-2 drill-site in the Whataroa Valley from late 2008. The final four borehole stations were installed within 1.2 km of the drill-site in early 2013 to provide near-field observations of any seismicity that occurred during drilling and thus provide input into operational decision-making processes if required. The basis for making operational decisions in response to any detected seismicity had been established as part of a safety review conducted in early 2014 and was implemented using a "traffic light" system, a communications plan, and other operational documents. Continuous real-time earthquake monitoring took place throughout the drilling period, between September and late December 2014, and involved a team of up to 15 seismologists working in shifts near the drill-site and overseas. Prior to drilling, records from 55 local earthquakes and 14 quarry blasts were used as master templates in a matched-filter detection algorithm to test the capabilities of the seismic network for detecting seismicity near the drill site. The newly detected microseismicity was clustered near the DFDP-1 drill site at Gaunt Creek, 7.4 km southwest of DFDP-2. Relocations of these detected events provide more information about the fault geometry in this area. Although no detectable seismicity occurred within 5 km of the drill site during the drilling period, the region is capable of generating earthquakes that would have required an operational response had they occurred while drilling was underway (including a M2.9 event northwest of Gaunt Creek on 15 August 2014). The largest event to occur while drilling was underway was of M4.5 and occurred approximately 40 km east of the DFDP-2 drill site. In this presentation, we summarize the setup and operations of the seismic network and discuss key aspects of seismicity recorded prior to and during drilling operations.

  18. Synthesis, in vitro and in silico evaluation of novel trans-stilbene analogues as potential COX-2 inhibitors.

    PubMed

    Regulski, Miłosz; Piotrowska-Kempisty, Hanna; Prukała, Wiesław; Dutkiewicz, Zbigniew; Regulska, Katarzyna; Stanisz, Beata; Murias, Marek

    2018-01-01

    25 new trans-stilbene and trans-stilbazole derivatives were investigated using in vitro and in silico techniques. The selectivity and potency of the compounds were assessed using commercial ELISA test. The obtained results were incorporated into 2D QSAR assay. The most promising compound 4-nitro-3',4',5'-trihydroxy-trans-stilbene (N1) was synthetized and its potency and selectivity were confirmed. N1 was classified as preferential COX-2 inhibitor. Its ability to inhibit COX-2 in MCF-7 cell line was established and its cytotoxicity by MTT test was assessed. The compound was more cytotoxic than celecoxib within studied concentration range. Finally, the investigated trans-stilbene was docked into COX-1 and COX-2 active sites using "CDOCKER" protocol. Copyright © 2017 Elsevier Ltd. All rights reserved.

  19. Final safety analysis report for the Ground Test Accelerator (GTA), Phase 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-10-01

    This document is the first volume of a 3 volume safety analysis report on the Ground Test Accelerator (GTA). The GTA program at the Los Alamos National Laboratory (LANL) is the major element of the national Neutral Particle Beam (NPB) program, which is supported by the Strategic Defense Initiative Office (SDIO). A principal goal of the national NPB program is to assess the feasibility of using hydrogen and deuterium neutral particle beams outside the Earth`s atmosphere. The main effort of the NPB program at Los Alamos concentrates on developing the GTA. The GTA is classified as a low-hazard facility, exceptmore » for the cryogenic-cooling system, which is classified as a moderate-hazard facility. This volume consists of an introduction, summary/conclusion, site description and assessment, description of facility, and description of operation.« less

  20. Regional Magnitude Research Supporting Broad-Area Monitoring of Small Seismic Events

    DTIC Science & Technology

    2007-09-01

    detonated at the Nevada Test Site (NTS) and the Semipalatinsk Test Site (STS). Observations for both test sites show that Pn amplitudes yield scale 10...identification procedures, and yield, via direct comparison to test site results for high frequencies (>1 Hz). Coda techniques are known to be effective...2006). Source spectral modeling of regional P/S discriminants at nuclear test sites in China and the former Soviet Union, Bull. Seismol. Soc. Am

  1. Cord blood DNA methylation and adiposity measures in early and mid-childhood.

    PubMed

    Kresovich, Jacob K; Zheng, Yinan; Cardenas, Andres; Joyce, Brian T; Rifas-Shiman, Sheryl L; Oken, Emily; Gillman, Matthew W; Hivert, Marie-France; Baccarelli, Andrea A; Hou, Lifang

    2017-01-01

    Excess adiposity in childhood is associated with numerous adverse health outcomes. As this condition is difficult to treat once present, identification of risk early in life can help inform and implement strategies to prevent the onset of the condition. We performed an epigenome-wide association study to prospectively investigate the relationship between cord blood DNA methylation and adiposity measurements in childhood. We measured genome-wide DNA methylation from 478 children in cord blood and measured overall and central adiposity via skinfold caliper measurements in early (range 3.1-3.3 years) and mid-childhood (age range 7.3-8.3 years) and via dual X-ray absorptiometry (DXA) in mid-childhood. Final models were adjusted for maternal age at enrollment, pre-pregnancy body mass index, education, folate intake during pregnancy, smoking during pregnancy, and gestational weight gain, and child sex, race/ethnicity, current age, and cord blood cell composition. We identified four promoter proximal CpG sites that were associated with adiposity as measured by subscapular (SS) and triceps (TR) ratio (SS:TR) in early childhood, in the genes KPRP , SCL9A10 , MYLK2 , and PRLHR . We additionally identified one gene body CpG site associated with early childhood SS + TR on PPAPDC1A ; this site was nominally associated with SS + TR in mid-childhood. Higher methylation at one promoter proximal CpG site in MMP25 was also associated with SS:TR in mid-childhood. In regional analyses, methylation at an exonal region of GFPT2 was positively associated with SS:TR in early childhood. Finally, we identified regions of two long, non-coding RNAs which were associated with SS:TR (LOC100049716) and fat-free mass index (LOC102723493) in mid-childhood. This analysis identified novel CpG loci associated with adiposity outcomes. However, our results suggest little consistency across the various adiposity outcomes tested, particularly among the more accurate DXA measurements of body composition. We recommend using caution when interpreting these associations.

  2. 75 FR 22524 - Ocean Dumping; Designation of Ocean Dredged Material Disposal Sites Offshore of the Siuslaw River...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... location to dispose of material dredged from the Siuslaw River navigation channel, and to provide a... sediments from Site A back into the dredged channel resulted in a selection of disposal Sites B and C by the... conflicts. The final Sites are located close to the approach to the Siuslaw River entrance channel but are...

  3. Pattern recognition of native plant communities: Manitou Colorado test site

    NASA Technical Reports Server (NTRS)

    Driscoll, R. S.

    1972-01-01

    Optimum channel selection among 12 channels of multispectral scanner imagery identified six as providing the best information about 11 vegetation classes and two nonvegetation classes at the Manitou Experimental Forest. Intensive preprocessing of the scanner signals was required to eliminate a serious scan angle effect. Final processing of the normalized data provided acceptable recognition results of generalized plant community types. Serious errors occurred with attempts to classify specific community types within upland grassland areas. The consideration of the convex mixtures concept (effects of amounts of live plant cover, exposed soil, and plant litter cover on apparent scene radiances) significantly improved the classification of some of the grassland classes.

  4. DIAZOPHTHALOCYANINS AS REAGENTS FOR FINE STRUCTURAL CYTOCHEMISTRY

    PubMed Central

    Tice, Lois Withrow; Barrnett, Russell J.

    1965-01-01

    This paper reports the synthesis of 14 diazophthalocyanins containing Mg, Cu, or Pb as the chelated metal. To assess the usefulness of these compounds for fine structural cytochemistry, the relative coupling rates with naphthols were tested as well as the solubility of the resulting azo dyes. Three of the diazotates were reacted with tissue proteins in aldehyde-fixed material, and the density increases thus produced were compared in the electron microscope with those produced by staining similarly fixed material with the phthalocyanin dye, Alcian Blue. Finally, one of the diazotates was used as a capture reagent for the demonstration of the sites of acid phosphatase activity with the electron microscope. PMID:14283629

  5. CID Aircraft pre-impact lakebed skid

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The B-720 is seen viewed moments after impact and just before hitting the wing openers. In a typical aircraft crash, fuel spilled from ruptured fuel tanks forms a fine mist that can be ignited by a number of sources at the crash site. In 1984 the NASA Dryden Flight Research Facility (after 1994 a full-fledged Center again) and the Federal Aviation Administration (FAA) teamed-up in a unique flight experiment called the Controlled Impact Demonstration (CID), to test crash a Boeing 720 aircraft using standard fuel with an additive designed to supress fire. The additive, FM-9, a high-molecular-weight long-chain polymer, when blended with Jet-A fuel had demonstrated the capability to inhibit ignition and flame propagation of the released fuel in simulated crash tests. This anti-misting kerosene (AMK) cannot be introduced directly into a gas turbine engine due to several possible problems such as clogging of filters. The AMK must be restored to almost Jet-A before being introduced into the engine for burning. This restoration is called 'degradation' and was accomplished on the B-720 using a device called a 'degrader.' Each of the four Pratt & Whitney JT3C-7 engines had a 'degrader' built and installed by General Electric (GE) to break down and return the AMK to near Jet-A quality. In addition to the AMK research the NASA Langley Research Center was involved in a structural loads measurement experiment, which included having instrumented dummies filling the seats in the passenger compartment. Before the final flight on December 1, 1984, more than four years of effort passed trying to set-up final impact conditions considered survivable by the FAA. During those years while 14 flights with crews were flown the following major efforts were underway: NASA Dryden developed the remote piloting techniques necessary for the B-720 to fly as a drone aircraft; General Electric installed and tested four degraders (one on each engine); and the FAA refined AMK (blending, testing, and fueling a full-size aircraft). The 15 flights had 15 takeoffs, 14 landings and a larger number of approaches to about 150 feet above the prepared crash site under remote control. These flight were used to introduce AMK one step at a time into some of the fuel tanks and engines while monitoring the performance of the engines. On the final flight (No. 15) with no crew, all fuel tanks were filled with a total of 76,000 pounds of AMK and the remotely-piloted aircraft landed on Rogers Dry Lakebed in an area prepared with posts to test the effectiveness of the AMK in a controlled impact. The CID, which some wags called the Crash in the Desert, was spectacular with a large fireball enveloping and burning the B-720 aircraft. From the standpoint of AMK the test was a major set-back, but for NASA Langley, the data collected on crashworthiness was deemed successful and just as important.

  6. Prediction accuracies for growth and wood attributes of interior spruce in space using genotyping-by-sequencing.

    PubMed

    Gamal El-Dien, Omnia; Ratcliffe, Blaise; Klápště, Jaroslav; Chen, Charles; Porth, Ilga; El-Kassaby, Yousry A

    2015-05-09

    Genomic selection (GS) in forestry can substantially reduce the length of breeding cycle and increase gain per unit time through early selection and greater selection intensity, particularly for traits of low heritability and late expression. Affordable next-generation sequencing technologies made it possible to genotype large numbers of trees at a reasonable cost. Genotyping-by-sequencing was used to genotype 1,126 Interior spruce trees representing 25 open-pollinated families planted over three sites in British Columbia, Canada. Four imputation algorithms were compared (mean value (MI), singular value decomposition (SVD), expectation maximization (EM), and a newly derived, family-based k-nearest neighbor (kNN-Fam)). Trees were phenotyped for several yield and wood attributes. Single- and multi-site GS prediction models were developed using the Ridge Regression Best Linear Unbiased Predictor (RR-BLUP) and the Generalized Ridge Regression (GRR) to test different assumption about trait architecture. Finally, using PCA, multi-trait GS prediction models were developed. The EM and kNN-Fam imputation methods were superior for 30 and 60% missing data, respectively. The RR-BLUP GS prediction model produced better accuracies than the GRR indicating that the genetic architecture for these traits is complex. GS prediction accuracies for multi-site were high and better than those of single-sites while multi-site predictability produced the lowest accuracies reflecting type-b genetic correlations and deemed unreliable. The incorporation of genomic information in quantitative genetics analyses produced more realistic heritability estimates as half-sib pedigree tended to inflate the additive genetic variance and subsequently both heritability and gain estimates. Principle component scores as representatives of multi-trait GS prediction models produced surprising results where negatively correlated traits could be concurrently selected for using PCA2 and PCA3. The application of GS to open-pollinated family testing, the simplest form of tree improvement evaluation methods, was proven to be effective. Prediction accuracies obtained for all traits greatly support the integration of GS in tree breeding. While the within-site GS prediction accuracies were high, the results clearly indicate that single-site GS models ability to predict other sites are unreliable supporting the utilization of multi-site approach. Principle component scores provided an opportunity for the concurrent selection of traits with different phenotypic optima.

  7. CONCEPTUAL DESIGN ASSESSMENT FOR THE COFIRING OF BIOREFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David J. Webster; Jeffrey T. Ranney; Jacqueline G. Broder

    2002-07-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed. Processing of biosolids and pilot facility hydrolysis production have been completed to produce lignin for cofire testing. EERC had received all the biomass and baseline coal fuels for use in testing. All the combustion and fuel handling tests at EERC have been completed. During fuel preparation EERC reported no difficulties in fuel blending and handling. Preliminary cofire test results indicate that the blending of lignin and biosolids with the Colbert coal blendmore » generally reduces NOx emissions, increases the reactivity of the coal, and increases the ash deposition rate on superheater surfaces. Deposits produced from the fuel blends, however, are more friable and hence easier to remove from tube surfaces relative to those produced from the baseline Colbert coal blend. A draft of the final cofire technical report entitled ''Effects of Cofiring Lignin and Biosolids with Coal on Fireside Performance and Combustion Products'' has been prepared and is currently being reviewed by project team members. A final report is expected by mid-third quarter 2002. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The environmental review, preferred steam supply connection points and steam pipeline routing, and assessment of steam export impacts have been completed without major issue. A cost estimate for the steam supply system was also completed. TVA is further evaluating the impacts of adding lignin to the coal fuel blend and how the steam cost is impacted by proximity of the Masada biomass facility. TVA has provided a draft final report that is under review by team members.« less

  8. Multifaceted roles of Lys166 of ribulose-bisphosphate carboxylase/oxygenase as discerned by product analysis and chemical rescue of site-directed mutants.

    PubMed

    Harpel, Mark R; Larimer, Frank W; Hartman, Fred C

    2002-01-29

    Ab initio calculations [King, W. A., et al. (1998) Biochemistry 37, 15414-15422] of an active-site mimic of D-ribulose-1,5-bisphosphate carboxylase/oxygenase suggest that active-site Lys166 plays a role in carboxylation in addition to its functions in the initial deprotonation and final protonation steps. To test this postulate, the turnover of 1-(3)H-labeled D-ribulose 1,5-bisphosphate (RuBP) by impaired position-166 mutants was characterized. Although these mutants catalyze slow enolization of RuBP, most of the RuBP-enediol undergoes beta-elimination of phosphate to form 2,3-pentodiulose 5-phosphate, signifying deficiencies in normal carboxylation and oxygenation. Much of the remaining RuBP-enediol is carboxylated but forms pyruvate, rather than 3-phospho-D-glycerate, due to incapacity in protonation of the terminal aci-acid intermediate. As a further test of the postulate, the effects of subtle perturbation of the Lys166 side chain on the carboxylation/oxygenation partitioning ratio (tau) were determined. To eliminate a chemically reactive site, Cys58 was replaced by a seryl residue without any loss of activity. The virtually inactive K166C-C58S double mutant was chemically rescued by aminoethylation or aminopropylation to reinsert a lysyl-like side chain at position 166. Relative to the wild-type value, tau for the aminoethylated enzyme was increased by approximately 30%, and tau for the aminopropylated enzyme was decreased by approximately 80%. Thus, two lines of experimentation support the theoretically based conclusion for the importance of Lys166 in the reaction of RuBP-enediol with gaseous substrates.

  9. Slope stability and bearing capacity of landfills and simple on-site test methods.

    PubMed

    Yamawaki, Atsushi; Doi, Yoichi; Omine, Kiyoshi

    2017-07-01

    This study discusses strength characteristics (slope stability, bearing capacity, etc.) of waste landfills through on-site tests that were carried out at 29 locations in 19 sites in Japan and three other countries, and proposes simple methods to test and assess the mechanical strength of landfills on site. Also, the possibility of using a landfill site was investigated by a full-scale eccentric loading test. As a result of this, landfills containing more than about 10 cm long plastics or other fibrous materials were found to be resilient and hard to yield. An on-site full scale test proved that no differential settlement occurs. The repose angle test proposed as a simple on-site test method has been confirmed to be a good indicator for slope stability assessment. The repose angle test suggested that landfills which have high, near-saturation water content have considerably poorer slope stability. The results of our repose angle test and the impact acceleration test were related to the internal friction angle and the cohesion, respectively. In addition to this, it was found that the air pore volume ratio measured by an on-site air pore volume ratio test is likely to be related to various strength parameters.

  10. Transfer-appropriate processing in the testing effect.

    PubMed

    Veltre, Mary T; Cho, Kit W; Neely, James H

    2015-01-01

    The testing effect is the finding that taking a review test enhances performance on a final test relative to restudying the material. The present experiment investigated transfer-appropriate processing in the testing effect using semantic and orthographic cues to evoke conceptual and data-driven processing, respectively. After a study phase, subjects either restudied the material or took a cued-recall test consisting of half semantic and half orthographic cues in which the correct response was given as feedback. A final, cued-recall test consisted of the identical cue, or a new cue that was of the same type or different type of cue (semantic/orthographic or orthographic/semantic) as that used for that target in the review test. Testing enhanced memory in all conditions. When the review cues and final-test cues were identical, final recall was higher for semantic than orthographic cues. Consistent with test-based transfer-appropriate processing, memory performance improved as the review and final cues became more similar. These results suggest that the testing effect could potentially be caused by the episodic retrieval processes in a final memory test overlapping more with the episodic retrieval processes in a review test than with the encoding operations performed during restudy.

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  12. Mariano Lake Mine: Technical Reports

    EPA Pesticide Factsheets

    This Final Removal Site Evaluation describes the objectives, work performed, and results of a Removal Site Evaluation (RSE) at the Mariano Lake Mine, which was performed by ARCADIS U.S., Inc. on behalf of Chevron Environmental Management Company.

  13. 77 FR 57495 - National Priorities List, Final Rule No. 55

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ... EPA is responsible for preparing a Hazard Ranking System (``HRS'') score and determining whether the... an NPL construction completion list (``CCL'') to simplify its system of categorizing sites and to...). Inclusion of a site on the CCL has no legal significance. Sites qualify for the CCL when: (1) Any necessary...

  14. Economics of site preparation and release treatments using herbicides in Central Georgia

    Treesearch

    Rodney L. Busby; James H. Miller; M. Boyd Edwards

    1998-01-01

    Abstract. Land expectation values (LEV) of site preparation and release treatments using herbicides in central Georgia are calculated and compared Loblolly pine growth and hardwood competition levels were measured at age 6 for the site preparation treatments and age 8 for the release treatments. These measurements were projected to final harvest...

  15. Evaluation of surface renewal and flux-variance methods above agricultural and forest surfaces

    NASA Astrophysics Data System (ADS)

    Fischer, M.; Katul, G. G.; Noormets, A.; Poznikova, G.; Domec, J. C.; Trnka, M.; King, J. S.

    2016-12-01

    Measurements of turbulent surface energy fluxes are of high interest in agriculture and forest research. During last decades, eddy covariance (EC), has been adopted as the most commonly used micrometeorological method for measuring fluxes of greenhouse gases, energy and other scalars at the surface-atmosphere interface. Despite its robustness and accuracy, the costs of EC hinder its deployment at some research experiments and in practice like e.g. for irrigation scheduling. Therefore, testing and development of other cost-effective methods is of high interest. In our study, we tested performance of surface renewal (SR) and flux variance method (FV) for estimates of sensible heat flux density. Surface renewal method is based on the concept of non-random transport of scalars via so-called coherent structures which if accurately identified can be used for the computing of associated flux. Flux variance method predicts the flux from the scalar variance following the surface-layer similarity theory. We tested SR and FV against EC in three types of ecosystem with very distinct aerodynamic properties. First site was represented by agricultural wheat field in the Czech Republic. The second site was a 20-m tall mixed deciduous wetland forest on the coast of North Carolina, USA. The third site was represented by pine-switchgrass intercropping agro-forestry system located in coastal plain of North Carolina, USA. Apart from solving the coherent structures in a SR framework from the structure functions (representing the most common approach), we applied ramp wavelet detection scheme to test the hypothesis that the duration and amplitudes of the coherent structures are normally distributed within the particular 30-minutes time intervals and so just the estimates of their averages is sufficient for the accurate flux determination. Further, we tested whether the orthonormal wavelet thresholding can be used for isolating of the coherent structure scales which are associated with flux transport. Finally, we tested whether low-pass filtering in the Fourier domain based on integral length scale can improve estimates of both SR and FV as it supposedly removes the low frequency portion of the signal not related with the investigated fluxes.

  16. Effects of Age, Exercise Duration, and Test Conditions on Heart Rate Variability in Young Endurance Horses

    PubMed Central

    Younes, Mohamed; Robert, Céline; Barrey, Eric; Cottin, François

    2016-01-01

    Although cardiac recovery is an important criterion for ranking horses in endurance competitions, heart rate variability (HRV) has hardly ever been studied in the context of this equestrian discipline. In the present study, we sought to determine whether HRV is affected by parameters such as age, exercise duration and test site. Accordingly, HRV might be used to select endurance horses with the fastest cardiac recovery. The main objective of the present study was to determine the effects of age, exercise duration, and test site on HRV variables at rest and during exercise and recovery in young Arabian endurance horses. Over a 3-year period, 77 young Arabian horses aged 4–6 years performed one or more exercise tests (consisting of a warm-up, cantering at 22 km.h−1and a final 500 m gallop at full speed) at four different sites. Beat-to-beat RR intervals were continuously recorded and then analyzed (using a time-frequency approach) to determine the instantaneous HRV components before, during and after the test. At rest, the root-mean-square of successive differences in RR intervals (RMSSD) was higher in the 4-year-olds (54.4 ± 14.5 ms) than in the 5-or 6-year-olds (44.9 ± 15.5 and 49.1 ± 11.7 ms, respectively). During the first 15 min of exercise (period T), the heart rate (HR) and RMSSD decreased with age. In 6-year-olds, RMSSD decreased as the exercise duration increased (T: 3.0 ± 1.4 vs. 2T: 3.6 ± 2.2 vs. 3T: 2.8 ± 1.0). During recovery, RMSSD was negatively correlated with the cardiac recovery time (CRT) and the recovery heart rate (RHR; R = −0.56 and −0.53, respectively; p < 0.05). At rest and during exercise and recovery, RMSSD and several HRV variables differed significantly as a function of the test conditions. HRV in endurance horses appears to be strongly influenced by age and environmental factors (such as ambient temperature, ambient humidity, and track quality). Nevertheless, RMSSD can be used to select endurance horses with the fastest cardiac recovery. PMID:27199770

  17. An Analysis of the Seismic Source Characteristics of Explosions in Low-Coupling Dry Porous Media

    DTIC Science & Technology

    2011-09-29

    Semipalatinsk Test Site (Shagan, Degelen and Konystan Testing Areas) and in Salt at the Former Soviet Azgir Test Site ...to be applicable to all underground nuclear explosions conducted in various hard rock media at the former Soviet Semipalatinsk test site , as well as...in Hard Rock at the Former Soviet Semipalatinsk Test Site (Shagan, Degelen and Konystan Testing Areas) and in Salt at the Former Soviet Azgir Test

  18. Addendum to the Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit Nevada Test Site, Nevada, Revison 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  19. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  20. Addendum to the Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  1. Addendum to the Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  2. Tests Enhance the Transfer of Learning

    ERIC Educational Resources Information Center

    Rohrer, Doug; Taylor, Kelli; Sholar, Brandon

    2010-01-01

    Numerous learning studies have shown that if the period of time devoted to studying information (e.g., casa-house) includes at least 1 test (casa-?), performance on a final test is improved--a finding known as the "testing effect". In most of these studies, however, the final test is identical to the initial test. If the final test…

  3. D Integrated Methodologies for the Documentation and the Virtual Reconstruction of AN Archaeological Site

    NASA Astrophysics Data System (ADS)

    Balletti, C.; Guerra, F.; Scocca, V.; Gottardi, C.

    2015-02-01

    Highly accurate documentation and 3D reconstructions are fundamental for analyses and further interpretations in archaeology. In the last years the integrated digital survey (ground-based survey methods and UAV photogrammetry) has confirmed its main role in the documentation and comprehension of excavation contexts, thanks to instrumental and methodological development concerning the on site data acquisition. The specific aim of the project, reported in this paper and realized by the Laboratory of Photogrammetry of the IUAV University of Venice, is to check different acquisition systems and their effectiveness test, considering each methodology individually or integrated. This research focuses on the awareness that the integration of different survey's methodologies can as a matter of fact increase the representative efficacy of the final representations; these are based on a wider and verified set of georeferenced metric data. Particularly the methods' integration allows reducing or neutralizing issues related to composite and complex objects' survey, since the most appropriate tools and techniques can be chosen considering the characteristics of each part of an archaeological site (i.e. urban structures, architectural monuments, small findings). This paper describes the experience in several sites of the municipality of Sepino (Molise, Italy), where the 3d digital acquisition of cities and structure of monuments, sometimes hard to reach, was realized using active and passive techniques (rage-based and image based methods). This acquisition was planned in order to obtain not only the basic support for interpretation analysis, but also to achieve models of the actual state of conservation of the site on which some reconstructive hypotheses can be based on. Laser scanning data were merged with Structure from Motion techniques' clouds into the same reference system, given by a topographical and GPS survey. These 3d models are not only the final results of the metric survey, but also the starting point for the whole reconstruction of the city and its urban context, from the research point of view. This reconstruction process will concern even some areas that have not yet been excavated, where the application of procedural modelling can offer an important support to the reconstructive hypothesis.

  4. Addendum to the Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less

  5. In situ Bioreduction of Uranium (VI) in Groundwater and Sediments with Edible Oil as the Electron Donor

    NASA Astrophysics Data System (ADS)

    Wu, W.; Watson, D. B.; Mehlhorn, T.; Zhang, G.; Earles, J.; Lowe, K.; Phillips, J.; Boyanov, M.; Kemner, K. M.; Schadt, C. W.; Brooks, S. C.; Criddle, C.; Jardine, P.

    2009-12-01

    In situ bioremediation of a uranium-contaminated aquifer was conducted at the US DOE Environmental Remediation Sciences Program (ERSP) Integrated Field Research Challenge (IFRC) site, in Oak Ridge, TN. Edible oil was tested as a slow-release electron donor for microbially mediated U (VI) reduction. Uranium contaminated sediments from the site were used in laboratory microcosm tests to study the feasibility of using this electron donor under anaerobic, ambient temperature conditions. Parallel microcosms were established using ethanol as electron donor for comparison. The tests also examined the impact of sulfate concentrations on U (VI) reduction. The oil was degraded by indigenous microorganisms with acetate as a major product but at a much slower rate than ethanol. The rapid removal of U (VI) from the aqueous phase occurred concurrently with acetate production and sulfate reduction. Initial U(VI) concentration in the aqueous phase increased with increased sulfate concentration (1 vs. 5 mM), likely due to U(VI) desorption from the solid phase, but more U(VI) was reduced with higher initial sulfate level. Finally, the bioreaction in microcosms progressed to methanogenesis. Subsequently, a field test with the edible oil was conducted in a highly permeable gravelly layer (hydraulic conductivity 0.076 cm/sec). Groundwater at the site contained 5-6 μM U; 1.0-1.2 mM sulfate; 3-4 mM Ca; pH 6.8. Diluted emulsified oil (20% solution) was injected into three injection wells within 2 hrs. Geochemical analysis of site groundwater demonstrated the sequential reduction of nitrate, Mn, Fe(III) and sulfate. Transient accumulation of acetate was observed as an intermediate in the oil degradation. Reduction and removal of uranium from groundwater was observed in all wells connected to the injection wells after 2-4 weeks. Uranium concentrations in groundwater were reduced to below 0.126 μM (EPA drinking water standard), at some well locations. Rebound of U in groundwater was observed together with the rebound of sulfate concentrations as the oil was consumed. Uranium (VI) reduction to U (IV) in the microcosm and in situ field tests was confirmed by X-ray near-edge absorption spectroscopy analysis. Bacterial populations in microcosms and field samples were analyzed using 16S rRNA gene libraries and Geochip analysis.

  6. 75 FR 4803 - Notice of Availability of the Final Environmental Impact Statement for Decommissioning and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ...). The Proposed Action includes the decontamination and decommissioning of the waste storage tanks and... site facilities identified in the Final EIS would be removed; contaminated soil, sediment, and...

  7. Preliminary Assessment of Mars Exploration Rover Landing Site Predictions

    NASA Technical Reports Server (NTRS)

    Golombek, M.; Grant, J.; Parker, T.; Crisp, J.; Squyres, S.; Carr, M.; Haldemann, A.; Arvidson, R.; Ehlmann, B.; Bell, J.

    2004-01-01

    Selection of the Mars Exploration Rover (MER) landing sites took place over a three year period in which engineering constraints were identified, 155 possible sites were downselected to the final two, surface environments and safety considerations were developed, and the potential science return at the sites was considered. Landing sites in Gusev crater and Meridiani Planum were selected because they appeared acceptably safe for MER landing and roving and had strong morphologic and mineralogical indicators of liquid water in their past and thus appeared capable of addressing the science objectives of the MER missions, which are to determine the aqueous, climatic, and geologic history of sites on Mars where conditions may have been favorable to the preservation of evidence of possible pre-biotic or biotic processes. Engineering constraints important to the selection included: latitude (10 N-15 S) for maximum solar power; elevation (<-1.3 km) for sufficient atmosphere to slow the lander; low horizontal winds, shear and turbulence in the last few kilometers to minimize horizontal velocity; low 10-m scale slopes to reduce airbag spinup and bounce; moderate rock abundance to reduce abrasion or stroke-out of the airbags; and a radar-reflective, load-bearing and trafficable surface safe for landing and roving that is not dominated by fine-grained dust. In selecting the MER landing sites these engineering constraints were addressed via comprehensive evaluation of surface and atmospheric characteristics from existing remote sensing data and models as well as targeted orbital information acquired from Mars Global Surveyor and Mars Odyssey. This evaluation resulted in a number of predictions of the surface characteristics of the sites, which are tested in this abstract. Relating remote sensing signatures to surface characteristics at landing sites allows these sites to be used as ground truth for the orbital data, is essential for selecting and validating landing sites for future missions, and is required for correctly interpreting the surfaces and materials globally present on Mars.

  8. Detecting an elusive invasive species: a diagnostic PCR to detect Burmese python in Florida waters and an assessment of persistence of environmental DNA.

    PubMed

    Piaggio, Antoinette J; Engeman, Richard M; Hopken, Matthew W; Humphrey, John S; Keacher, Kandy L; Bruce, William E; Avery, Michael L

    2014-03-01

    Recent studies have demonstrated that detection of environmental DNA (eDNA) from aquatic vertebrates in water bodies is possible. The Burmese python, Python bivittatus, is a semi-aquatic, invasive species in Florida where its elusive nature and cryptic coloration make its detection difficult. Our goal was to develop a diagnostic PCR to detect P. bivittatus from water-borne eDNA, which could assist managers in monitoring this invasive species. First, we used captive P. bivittatus to determine whether reptilian DNA could be isolated and amplified from water samples. We also evaluated the efficacy of two DNA isolation methods and two DNA extraction kits commonly used in eDNA preparation. A fragment of the mitochondrial cytochrome b gene from P. bivittatus was detected in all water samples isolated with the sodium acetate precipitate and the QIAamp DNA Micro Kit. Next, we designed P. bivittatus-specific primers and assessed the degradation rate of eDNA in water. Our primers did not amplify DNA from closely related species, and we found that P. bivittatus DNA was consistently detectable up to 96 h. Finally, we sampled water from six field sites in south Florida. Samples from five sites, where P. bivittatus has been observed, tested positive for eDNA. The final site was negative and had no prior documented evidence of P. bivittatus. This study shows P. bivittatus eDNA can be isolated from water samples; thus, this method is a new and promising technique for the management of invasive reptiles. Published 2013. This article is a U.S. Government work and is in the public domain in the USA.

  9. 78 FR 12259 - Unmanned Aircraft System Test Site Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...-0061] Unmanned Aircraft System Test Site Program AGENCY: Federal Aviation Administration (FAA), DOT... Defense, develop a test site program for the integration of unmanned aircraft systems in to the National Airspace System. The overall purpose of this test site program is to develop a body of data and operational...

  10. Addendum to the Closure Report for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on an “Occasional Use Area” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 400 total work hours). Any proposed activity within this use restricted area that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining postings at this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less

  11. Cost-effectiveness of rapid HCV testing and simultaneous rapid HCV and HIV testing in substance abuse treatment programs

    PubMed Central

    Schackman, Bruce R.; Leff, Jared A.; Barter, Devra M.; DiLorenzo, Madeline A.; Feaster, Daniel J.; Metsch, Lisa R.; Freedberg, Kenneth A.; Linas, Benjamin P.

    2014-01-01

    Aims To evaluate the cost-effectiveness of rapid hepatitis C virus (HCV) and simultaneous HCV/HIV antibody testing in substance abuse treatment programs. Design We used a decision analytic model to compare the cost-effectiveness of no HCV testing referral or offer, off-site HCV testing referral, on-site rapid HCV testing offer, and on-site rapid HCV and HIV testing offer. Base case inputs included 11% undetected chronic HCV, 0.4% undetected HIV, 35% HCV co-infection among HIV-infected, 53% linked to HCV care after testing antibody positive, and 67% linked to HIV care. Disease outcomes were estimated from established computer simulation models of HCV (HEP-CE) and HIV (CEPAC). Setting and Participants Data on test acceptance and costs were from a national randomized trial of HIV testing strategies conducted at 12 substance abuse treatment programs in the USA. Measurements Lifetime costs (2011 US dollars) and quality-adjusted life years (QALYs) discounted at 3% annually; incremental cost-effectiveness ratios (ICERs) Findings On-site rapid HCV testing had an ICER of $18,300/QALY compared with no testing, and was more efficient than (dominated) off-site HCV testing referral. On-site rapid HCV and HIV testing had an ICER of $64,500/QALY compared with on-site rapid HCV testing alone. In one and two-way sensitivity analyses, the ICER of on-site rapid HCV and HIV testing remained <$100,000/QALY, except when undetected HIV prevalence was <0.1% or when we assumed frequent HIV testing elsewhere. The ICER remained <$100,000/QALY in approximately 90% of probabilistic sensitivity analyses. Conclusions On-site rapid hepatitis C virus and HIV testing in substance abuse treatment programs is cost-effective at a <$100,000/ quality-adjusted life years threshold. PMID:25291977

  12. Implementing Rapid HIV Testing With or Without Risk-Reduction Counseling in Drug Treatment Centers: Results of a Randomized Trial

    PubMed Central

    Feaster, Daniel J.; Gooden, Lauren; Matheson, Tim; Mandler, Raul N.; Haynes, Louise; Tross, Susan; Kyle, Tiffany; Gallup, Dianne; Kosinski, Andrzej S.; Douaihy, Antoine; Schackman, Bruce R.; Das, Moupali; Lindblad, Robert; Erickson, Sarah; Korthuis, P. Todd; Martino, Steve; Sorensen, James L.; Szapocznik, José; Walensky, Rochelle; Branson, Bernard; Colfax, Grant N.

    2012-01-01

    Objectives. We examined the effectiveness of risk reduction counseling and the role of on-site HIV testing in drug treatment. Methods. Between January and May 2009, we randomized 1281 HIV-negative (or status unknown) adults who reported no past-year HIV testing to (1) referral for off-site HIV testing, (2) HIV risk-reduction counseling with on-site rapid HIV testing, or (3) verbal information about testing only with on-site rapid HIV testing. Results. We defined 2 primary self-reported outcomes a priori: receipt of HIV test results and unprotected anal or vaginal intercourse episodes at 6-month follow-up. The combined on-site rapid testing participants received more HIV test results than off-site testing referral participants (P < .001; Mantel-Haenszel risk ratio = 4.52; 97.5% confidence interval [CI] = 3.57, 5.72). At 6 months, there were no significant differences in unprotected intercourse episodes between the combined on-site testing arms and the referral arm (P = .39; incidence rate ratio [IRR] = 1.04; 97.5% CI = 0.95, 1.14) or the 2 on-site testing arms (P = .81; IRR = 1.03; 97.5% CI = 0.84, 1.26). Conclusions. This study demonstrated on-site rapid HIV testing’s value in drug treatment centers and found no additional benefit from HIV sexual risk-reduction counseling. PMID:22515871

  13. 78 FR 38388 - SGS North America, Inc. (Formerly SGS U.S. Testing Company, Inc.)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-26

    ... of one test site and the removal of one test site. This notice presents the Agency's preliminary...'s expansion request covers the addition of one additional test site. SGS's also requests the removal of one test site from its NRTL scope of recognition. SGS informed OSHA of a change in name from SGS U...

  14. 78 FR 15358 - DOE's Preferred Alternative for Certain Tanks Evaluated in the Final Tank Closure and Waste...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-11

    ... SUPPLEMENTARY INFORMATION.) \\1\\ Transuranic (TRU) waste is waste that contains alpha particle-emitting... available on the DOE NEPA Web site at http://energy.gov/nepa . Additional information on the Final TC & WM... INFORMATION CONTACT: For further information on the Final TC & WM EIS, contact Ms. Burandt as listed in...

  15. Free range users and one hit wonders: community users of an Internet-based cognitive behaviour therapy program.

    PubMed

    Christensen, Helen; Griffiths, Kathy; Groves, Chloe; Korten, Ailsa

    2006-01-01

    Little is known about the predictors of symptom change or the methods that might increase user 'compliance' on websites designed to improve mental health outcomes. The present paper: (i) examines predictors of expected final depression and anxiety scores on the MoodGYM website as a function of user characteristics; and (ii) compares the compliance rates of the original site with the new public version of the site (MoodGYM Mark II). The latter site requires compulsory completion of 'core' online assessments and may increase completion of site questionnaires. MoodGYM Mark I participants were 19,607 visitors (public registrants) between April 2001 and September 2003 plus 182 participants who had been randomly assigned to MoodGYM in an earlier trial (The BlueMood Trial). MoodGYM Mark II participants were 38,791 public registrants of the MoodGYM Mark II site collected between September 2003 and October 2004. Symptom assessments are repeated within the website intervention to allow the examination of change in symptoms. Outcome variables were gender, initial depression severity scores, number of assessments completed and final anxiety and depression scores. Men are predicted to be 0.19 units (SE=0.095) higher than women on depression, controlling for the initial depression level and number of modules completed. For initial depression scores above 2, it is predicted that the final score will indicate improvement relative to the initial score, the magnitude of the improvement increasing as a function of the number of modules attempted. For initial anxiety scores above 2, it is predicted that the final score will indicate improvement relative to the initial score, the magnitude of the improvement increasing as a function of the number of modules attempted. Mark II registrants were more likely than to Mark I registrants to complete onsite assessments. Visitors to the MoodGYM site are likely to have better psychological outcomes if they complete more of the site material. Compulsory completion of core sections increases assessment completion. There is a need to examine further the significance of attrition from online interventions, to develop methods of handling missing data, and to investigate strategies to improve visitor dropout.

  16. Site 300 Bat Monitoring Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drennan, Joe; Tortosa, Justin

    2016-07-18

    From June 15 to 18, 2015, GANDA biologist Graham Neale assisted in programming and fieldtesting of the bat monitoring equipment. The equipment was deployed in the field on a meteorological (MET) tower within Site 300 on June 18, 2015.

  17. Photosynthesis and the web: 2001.

    PubMed

    Orr, L

    2001-01-01

    First, a brief history of the Internet and the World Wide Web is presented. This is followed by relevant information on photosynthesis-related web sites grouped into several categories: (1) large group sites, (2) comprehensive overview sites, (3) specific subject sites, (4) individual researcher sites, (5) kindergarten through high school (K-12) educational sites, (6) books and journals, and, 7) other useful sites. A section on searching the Web is also included. Finally, we have included an appendix with all of the web sites discussed herein as well as other web sites that space did not allow. Readers are requested to send comments, corrections and additions to gov@uiuc.edu.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baxter, V. D.; Rice, K.; Murphy, R.

    Between October 2008 and May 2013 ORNL and ClimateMaster, Inc. (CM) engaged in a Cooperative Research and Development Agreement (CRADA) to develop a groundsource integrated heat pump (GS-IHP) system for the US residential market. A initial prototype was designed and fabricated, lab-tested, and modeled in TRNSYS (SOLAR Energy Laboratory, et al, 2010) to predict annual performance relative to 1) a baseline suite of equipment meeting minimum efficiency standards in effect in 2006 (combination of air-source heat pump (ASHP) and resistance water heater) and 2) a state-of-the-art (SOA) two-capacity ground-source heat pump with desuperheater water heater (WH) option (GSHPwDS). Predicted totalmore » annual energy savings, while providing space conditioning and water heating for a 2600 ft{sup 2} (242 m{sup 2}) house at 5 U.S. locations, ranged from 52 to 59%, averaging 55%, relative to the minimum efficiency suite. Predicted energy use for water heating was reduced 68 to 78% relative to resistance WH. Predicted total annual savings for the GSHPwDS relative to the same baseline averaged 22.6% with water heating energy use reduced by 10 to 30% from desuperheater contributions. The 1st generation (or alpha) prototype design for the GS-IHP was finalized in 2010 and field test samples were fabricated for testing by CM and by ORNL. Two of the alpha units were installed in 3700 ft{sup 2} (345 m{sup 2}) houses at the ZEBRAlliance site in Oak Ridge and field tested during 2011. Based on the steady-state performance demonstrated by the GS-IHPs it was projected that it would achieve >52% energy savings relative to the minimum efficiency suite at this specific site. A number of operational issues with the alpha units were identified indicating design changes needed to the system before market introduction could be accomplished. These were communicated to CM throughout the field test period. Based on the alpha unit test results and the diagnostic information coming from the field test experience, CM developed a 2nd generation (or beta) prototype in 2012. Field test verification units were fabricated and installed at the ZEBRAlliance site in Oak Ridge in May 2012 and at several sites near CM headquarters in Oklahoma. Field testing of the units continued through February 2013. Annual performance analyses of the beta unit (prototype 2) with vertical well ground heat exchangers (GHX) in 5 U.S. locations predict annual energy savings of 57% to 61%, averaging 59% relative to the minimum efficiency suite and 38% to 56%, averaging 46% relative to the SOA GSHPwDS. Based on the steady-state performance demonstrated by the test units it was projected that the 2nd generation units would achieve ~58% energy savings relative to the minimum efficiency suite at the Zebra Alliance site with horizontal GHX. A new product based on the beta unit design was announced by CM in 2012 – the Trilogy 40® Q-mode™ (http://cmdealernet.com/trilogy_40.html). The unit was formally introduced in a March 2012 press release (see Appendix A) and was available for order beginning in December 2012.« less

  19. The design, development, and test of balloonborne and groundbased lidar systems. Volume 3: Groundbased lidar systems

    NASA Astrophysics Data System (ADS)

    Shepherd, O.; Aurilio, G.; Bucknam, R. D.; Hurd, A. G.; Robertie, N. F.

    1991-06-01

    This is Volume 3 of a three volume final report on the design, development and test of balloonborne and groundbased lidar systems. Volume 1 describes the design and fabrication of a balloonborne CO2 coherent payload to measure the 10.6 micrometers backscatter from atmospheric aerosols as a function of altitude. Volume 2 describes the August 1987 flight test of Atmospheric Balloonborne Lidar Experiment, ABLE 2. In this volume we describe groundbased lidar development and measurements. A design was developed for installation of the ABLE lidar in the GL rooftop dome. A transportable shed was designed to house the ABLE lidar at the various remote measurement sites. Refurbishment and modification of the ABLE lidar were completed to permit groundbased lidar measurements of clouds and aerosols. Lidar field measurements were made at Ascension Island during SABLE 89. Lidar field measurements were made at Terciera, Azores during GABLE 90. These tasks have been successfully completed, and recommendations for further lidar measurements and data analysis have been made.

  20. Impact of sulfur oxides on mercury capture by activated carbon.

    PubMed

    Presto, Albert A; Granite, Evan J

    2007-09-15

    Recent field tests of mercury removal with activated carbon injection (ACI) have revealed that mercury capture is limited in flue gases containing high concentrations of sulfur oxides (SOx). In order to gain a more complete understanding of the impact of SOx on ACl, mercury capture was tested under varying conditions of SO2 and SO3 concentrations using a packed bed reactor and simulated flue gas (SFG). The final mercury content of the activated carbons is independent of the SO2 concentration in the SFG, but the presence of SO3 inhibits mercury capture even at the lowest concentration tested (20 ppm). The mercury removal capacity decreases as the sulfur content of the used activated carbons increases from 1 to 10%. In one extreme case, an activated carbon with 10% sulfur, prepared by H2SO4 impregnation, shows almost no mercury capacity. The results suggest that mercury and sulfur oxides are in competition for the same binding sites on the carbon surface.

Top