Sample records for siting constructing operating

  1. 10 CFR Appendix D to Subpart D of... - Classes of Actions That Normally Require EISs

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... average megawatts or more over a 12 month period. This applies to power marketing operations and to siting... Systems D2. Siting/construction/operation/decommissioning of nuclear fuel reprocessing facilities D3. Siting/construction/operation/decommissioning of uranium enrichment facilities D4. Siting/construction...

  2. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  3. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  4. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  5. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  6. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  7. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  8. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  9. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  10. 10 CFR 60.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES General..., special nuclear, and byproduct material at a geologic repository operations area sited, constructed, or... at a geologic repository operations area sited, constructed, or operated at Yucca Mountain, Nevada...

  11. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  12. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  13. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  14. 10 CFR 960.5-2-10 - Hydrology.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... OF ENERGY GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and Closure § 960.5-2-10... site will (1) be compatible with the activities required for repository construction, operation, and...

  15. SRS SWPF Construction Completion

    ScienceCinema

    Craig, Jack; Sheppard, Frank; Marks, Pam

    2018-01-16

    Now that construction is complete, DOE and construction contractor Parsons, are focusing on testing the Savannah River Site’s Salt Waste Processing Facility (SWPF) systems and training the workforce to operate the plant in preparation for the start of operations. Once in operation, the SWPF will significantly increase processing rates at SRS tank farms in an effort to empty the site’s high-level radioactive waste tanks.

  16. A GIS analysis of suitability for construction aggregate recycling sites using regional transportation network and population density features

    USGS Publications Warehouse

    Robinson, G.R.; Kapo, K.E.

    2004-01-01

    Aggregate is used in road and building construction to provide bulk, strength, support, and wear resistance. Reclaimed asphalt pavement (RAP) and reclaimed Portland cement concrete (RPCC) are abundant and available sources of recycled aggregate. In this paper, current aggregate production operations in Virginia, Maryland, and the District of Columbia are used to develop spatial association models for the recycled aggregate industry with regional transportation network and population density features. The cost of construction aggregate to the end user is strongly influenced by the cost of transporting processed aggregate from the production site to the construction site. More than 60% of operations recycling aggregate in the mid-Atlantic study area are located within 4.8 km (3 miles) of an interstate highway. Transportation corridors provide both sites of likely road construction where aggregate is used and an efficient means to move both materials and on-site processing equipment back and forth from various work sites to the recycling operations. Urban and developing areas provide a high market demand for aggregate and a ready source of construction debris that may be processed into recycled aggregate. Most aggregate recycling operators in the study area are sited in counties with population densities exceeding 77 people/km2 (200 people/mile 2). No aggregate recycling operations are sited in counties with less than 19 people/km2 (50 people/mile2), reflecting the lack of sufficient long-term sources of construction debris to be used as an aggregate source, as well as the lack of a sufficient market demand for aggregate in most rural areas to locate a recycling operation there or justify the required investment in the equipment to process and produce recycled aggregate. Weights of evidence analyses (WofE), measuring correlation on an area-normalized basis, and weighted logistic regression (WLR), are used to model the distribution of RAP and RPCC operations relative to transportation network and population distribution data. The models can be used on a regional scale to quickly map the relative site suitability for a RAP or RPCC aggregate recycling operation in a particular area based on transportation network and population parameters. The results can be used to identify general areas to be further evaluated on a site-specific basis using more detailed marketplace information. As transportation or population features change due to planning or actual development, the models can be easily revised to reflect these changes. ?? 2004 Elsevier B.V. All rights reserved.

  17. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...

  18. Hazard and operability study of the multi-function Waste Tank Facility. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hughes, M.E.

    1995-05-15

    The Multi-Function Waste Tank Facility (MWTF) East site will be constructed on the west side of the 200E area and the MWTF West site will be constructed in the SW quadrant of the 200W site in the Hanford Area. This is a description of facility hazards that site personnel or the general public could potentially be exposed to during operation. A list of preliminary Design Basis Accidents was developed.

  19. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  20. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  1. A before-after control-impact assessment to understand the potential impacts of highway construction noise and activity on an endangered songbird.

    PubMed

    Long, Ashley M; Colón, Melanie R; Bosman, Jessica L; Robinson, Dianne H; Pruett, Hannah L; McFarland, Tiffany M; Mathewson, Heather A; Szewczak, Joseph M; Newnam, J Cal; Morrison, Michael L

    2017-01-01

    Anthropogenic noise associated with highway construction and operation can have individual- and population-level consequences for wildlife (e.g., reduced densities, decreased reproductive success, behavioral changes). We used a before-after control-impact study design to examine the potential impacts of highway construction and traffic noise on endangered golden-cheeked warblers ( Setophaga chrysoparia ; hereafter warbler) in urban Texas. We mapped and monitored warbler territories before (2009-2011), during (2012-2013), and after (2014) highway construction at three study sites: a treatment site exposed to highway construction and traffic noise, a control site exposed only to traffic noise, and a second control site exposed to neither highway construction or traffic noise. We measured noise levels at varying distances from the highway at sites exposed to construction and traffic noise. We examined how highway construction and traffic noise influenced warbler territory density, territory placement, productivity, and song characteristics. In addition, we conducted a playback experiment within study sites to evaluate acute behavioral responses to highway construction noises. Noise decreased with increasing distance from the highways. However, noise did not differ between the construction and traffic noise sites or across time. Warbler territory density increased over time at all study sites, and we found no differences in warbler territory placement, productivity, behavior, or song characteristics that we can attribute to highway construction or traffic noise. As such, we found no evidence to suggest that highway construction or traffic noise had a negative effect on warblers during our study. Because human population growth will require recurring improvements to transportation infrastructure, understanding wildlife responses to anthropogenic noise associated with the construction and operation of roads is essential for effective management and recovery of prioritized species.

  2. Managing Construction Operations Visually: 3-D Techniques for Complex Topography and Restricted Visibility

    ERIC Educational Resources Information Center

    Rodriguez, Walter; Opdenbosh, Augusto; Santamaria, Juan Carlos

    2006-01-01

    Visual information is vital in planning and managing construction operations, particularly, where there is complex terrain topography and salvage operations with limited accessibility and visibility. From visually-assessing site operations and preventing equipment collisions to simulating material handling activities to supervising remotes sites…

  3. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  4. 50 CFR 216.200 - Specified activity and specified geographical region.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... under §§ 216.106 and 216.208 include, but may not be limited to, site construction, including ice road... ice road construction, and vessel and helicopter activity, but excluding seismic operations. (a)(1... TAKING AND IMPORTING OF MARINE MAMMALS Taking of Marine Mammals Incidental to Construction and Operation...

  5. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE ITER

    EPA Science Inventory

    In Fall 1994, anaerobic compost wetlands in both upflow and downflow configurations were constructed adjacent to and received drainage from the Burleigh Tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The e...

  6. Heavy construction equipment noise study using dosimetry and time-motion studies

    NASA Astrophysics Data System (ADS)

    Spencer, Ellsworth R.; Yantek, David S.

    2005-09-01

    Noise-induced hearing loss continues to afflict workers in many occupational settings despite longstanding recognition of the problems and well-known methods of prevention and regulations. Sound levels associated with heavy construction equipment range from 80 to 120 dB(A) and power tools commonly used in construction produce sound levels up to 115 dB(A). The focus of the research was to determine the noise exposures of heavy construction equipment operators while documenting the workers' tasks, (i.e., hauling, moving, and/or pushing construction material). Time-motion studies were performed at the construction sites and were used to correlate the noise dosage with the work performed by equipment operators. The cumulative dose for the operator was then plotted with references to work tasks, to identify the tasks that caused the greatest noise exposure. Three construction sites were examined and located in the western Pennsylvania and eastern Ohio areas. The types of construction equipment studied included asphalt pavers, backhoes, bulldozers, compaction equipment, excavators, haul trucks, telehandlers, and wheeled loaders. The results showed that bulldozer operators consistently had the highest noise exposures, ranging from a NIOSH REL (Recommended Exposure Limit) dose of 844% to 25836% and an OSHA PEL (Permissible Exposure Limit) dose of 139% to 1397%.

  7. Constructs and methods for genome editing and genetic engineering of fungi and protists

    DOEpatents

    Hittinger, Christopher Todd; Alexander, William Gerald

    2018-01-30

    Provided herein are constructs for genome editing or genetic engineering in fungi or protists, methods of using the constructs and media for use in selecting cells. The construct include a polynucleotide encoding a thymidine kinase operably connected to a promoter, suitably a constitutive promoter; a polynucleotide encoding an endonuclease operably connected to an inducible promoter; and a recognition site for the endonuclease. The constructs may also include selectable markers for use in selecting recombinations.

  8. ANAEROBIC COMPOST CONSTRUCTED WETLANDS SYSTEM TECHNOLOGY - SITE TECHNOLOGY CAPSULE

    EPA Science Inventory

    In fall 1994, anaerobic compost wetlands in both upflow and down flow configurations were constructed adjacent to and received drainage from the Burleigh tunnel, which forms part of the Clear Creek/Central City Superfund site. The systems were operated over a 3 year period. The ...

  9. Research on website construction based on website group platform of Chengdu sport institution

    NASA Astrophysics Data System (ADS)

    Hu, Zunyu

    2018-04-01

    This paper describes the necessity of website construction based on the website group of Chengdu sport institute, and discusses the technical features of the website group, Based on the website group platform architecture, the key technologies such as Web Service, AJAX, RSS and other key technologies are used to realize the construction of the website. Based on the website group platform architecture of the site, it effectively solves the information isolated island between the sites, and realizes the information sharing and resource integration. It is also more convenient that site and other sites have composed of site group integrated operation and maintenance.

  10. 49 CFR 325.33 - Site characteristics; highway operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 325.33 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR... MOTOR CARRIER NOISE EMISSION STANDARDS Measurement of Noise Emissions; Highway Operations § 325.33 Site... or utility poles. (2) Rural mailboxes. (3) Traffic railings of any type of construction except solid...

  11. 49 CFR 325.33 - Site characteristics; highway operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 325.33 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR... MOTOR CARRIER NOISE EMISSION STANDARDS Measurement of Noise Emissions; Highway Operations § 325.33 Site... or utility poles. (2) Rural mailboxes. (3) Traffic railings of any type of construction except solid...

  12. 49 CFR 325.33 - Site characteristics; highway operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 325.33 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR... MOTOR CARRIER NOISE EMISSION STANDARDS Measurement of Noise Emissions; Highway Operations § 325.33 Site... or utility poles. (2) Rural mailboxes. (3) Traffic railings of any type of construction except solid...

  13. 49 CFR 325.33 - Site characteristics; highway operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 325.33 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR... MOTOR CARRIER NOISE EMISSION STANDARDS Measurement of Noise Emissions; Highway Operations § 325.33 Site... or utility poles. (2) Rural mailboxes. (3) Traffic railings of any type of construction except solid...

  14. Session: Development and application of guidelines for siting, constructing, operating and monitoring wind turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manville, Albert; Hueckel, Greg

    2004-09-01

    This session at the Wind Energy and Birds/Bats workshop consisted of two presentations followed by a discussion/question and answer period. The two papers were: 'Development and Application of USFWS Guidance for Site Evaluation, Siting, Construction, Operation and Monitoring of Wind Turbines' by Albert Manville and 'Wind Power in Washington State' by Greg Hueckel. The session provided a comparison of wind project guidelines developed by the U.S. Fish and Wildlife Service (USFWS) in May 2003 and the Washington State Department of Fish and Wildlife in August 2003. Questions addressed included: is there a need or desire for uniform national or statemore » criteria; can other states learn from Washington State's example, or from the USFWS voluntary guidelines; should there be uniform requirements/guidelines/check-lists for the siting, operation, monitoring, and mitigation to prevent or minimize avian, bat, and other wildlife impacts.« less

  15. 10 CFR 960.3-4 - Environmental impacts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORY Implementation Guidelines § 960.3-4 Environmental impacts. Environmental impacts shall be considered by the DOE throughout the site characterization, site selection, and repository development..., during site characterization and repository construction, operation, closure, and decommissioning. ...

  16. Superfund record of decision (EPA Region 5): Skinner Landfill, West Chester, OH, June 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-04

    The decision document presents the selected final remedial action for the Skinner Landfill site in West Chester, Ohio. The remedy is the second and final of two operable units for this site. The first operable unit addressed immediate site concerns, through the construction of a fence around the contaminated area, and by offering an alternate supply of drinking water to the potentially affected users of groundwater. This final operable unit addresses potential future migration of site contaminants into the groundwater and will limit the potential for direct exposure of site contaminants to humans through source control measures.

  17. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zeitoun, A.

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment aremore » construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.« less

  18. Traffic condition with road upgrading during construction and operation stages based on level-of-service (LOS)

    NASA Astrophysics Data System (ADS)

    Tay, A. C.; Lee, H. H.

    2018-04-01

    In this study, traffic survey was done at signalized intersection of both ends of an upgrading road during morning and afternoon peak hours throughout construction period. The intersections of Tudan Road located at Miri City in Sarawak State, Malaysia were chosen as study sites. The aim of this research was to investigate the traffic condition for the signalized intersections of a R3 secondary road that being upgrading to standard U5 dual carriageway during peak hours for construction and operation stages. Data collected from these sites were analyzed according to Highway Capacity Manual (HCM) 2010. From the results, the level-of-services (LOS) of Kuala Baram By Pass Road intersection improved from Level F to Level E at operation stage for weekday during peak hours in the morning. LOS of Lutong-Kuala Baram Road intersection at construction stage were Level C during peak hours in the morning and Level D during peak hours in the afternoon for weekends. However, the LOS during both peak hours for weekends were projected to improve to Level B at the operation stage. It proved that the road construction has affected LOS, and this temporary issue can be solved after the upgraded road is in operation.

  19. Geotechnical investigation report for proposed array of six 40-meter diameter antennas, Pioneer site, DSS 11, Goldstone, California tracking complex

    NASA Technical Reports Server (NTRS)

    Sweitzer, J. S.

    1979-01-01

    The geotechnical investigation was conducted in three disciplines: (1) geological field reconnaissance of the general area of proposed construction; (2) geophysical seismic refraction survey of the localized area surrounding the six proposed antenna sites, including shear wave velocity determination; and (3) detailed foundation engineering investigation of each of the six sites. The investigations indicate that the six sites selected are relatively free from geologic hazards which would inhibit the proposed construction or future antenna operations.

  20. Environmental Assessment: Addressing Construction Projects at Niagara Falls Air Reserve Station, New York

    DTIC Science & Technology

    2011-07-01

    Aeronautical Research Center missile site (Site 5), JP-4 tank truck spill (Site 7) at the eastern end of Taxiway A, Building 202 Drum Storage Yard (Site...BNOISE2. BNOISE2 was developed by the . U.S. Army Construction Engineering Research Laboratory for the Operational Noise to assess large arms weapons...was estimated using the OneShot component of BNOISE2. Per AR 200-1, if there are multiple weapon types fired from one location, the single-event

  1. An application of the Pareto method in surveys to diagnose managers' and workers' perception of occupational safety and health on selected Polish construction sites.

    PubMed

    Obolewicz, Jerzy; Dąbrowski, Andrzej

    2017-11-16

    The construction industry is an important sector of the economy in Poland. According to the National Labour Inspectorate (PIP) data of 2014, the number of victims of fatal accidents in the construction sector amounted to 80 as compared with 187 injured in all other sectors of economy in Poland. This article presents the results of surveys on the impact of construction worker behaviour on the occupational safety and health outcomes. The surveys took into account the point of view of both construction site management (tactical level) and construction workers (operational level). For the analysis of results, the method of numerical taxonomy and Pareto charts was employed, which allowed the authors to identify the areas of occupational safety and health at both an operational and a tactical level, in which improvement actions needed to be proposed for workers employed in micro, small, medium and large construction enterprises.

  2. 75 FR 70021 - South Dakota Prairie Winds Project; Partial Term Relinquishment and Release of Easement for Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... certain easement rights for the construction, operation, and maintenance of the proposed wind energy... certain easement rights for the construction, operation, and maintenance of proposed wind energy... were: No Action Alternative (i.e., wind turbines would have to be sited on lands not encumbered with...

  3. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO

    EPA Science Inventory

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  4. The Construction And Instrumentation Of A Pilot Treatment System At The Standard Mine Superfund Site, Crested Butte, CO - (Presentation)

    EPA Science Inventory

    A pilot biochemical reactor (BCR) was designed and constructed to treat mine-influenced water emanating from an adit at a remote site in southern Colorado which receives an average of 400 inches (10.2 meters) of snowfall each season. The objective of the study is to operate and ...

  5. Modeling job sites in real time to improve safety during equipment operation

    NASA Astrophysics Data System (ADS)

    Caldas, Carlos H.; Haas, Carl T.; Liapi, Katherine A.; Teizer, Jochen

    2006-03-01

    Real-time three-dimensional (3D) modeling of work zones has received an increasing interest to perform equipment operation faster, safer and more precisely. In addition, hazardous job site environment like they exist on construction sites ask for new devices which can rapidly and actively model static and dynamic objects. Flash LADAR (Laser Detection and Ranging) cameras are one of the recent technology developments which allow rapid spatial data acquisition of scenes. Algorithms that can process and interpret the output of such enabling technologies into threedimensional models have the potential to significantly improve work processes. One particular important application is modeling the location and path of objects in the trajectory of heavy construction equipment navigation. Detecting and mapping people, materials and equipment into a three-dimensional computer model allows analyzing the location, path, and can limit or restrict access to hazardous areas. This paper presents experiments and results of a real-time three-dimensional modeling technique to detect static and moving objects within the field of view of a high-frame update rate laser range scanning device. Applications related to heavy equipment operations on transportation and construction job sites are specified.

  6. Patterns and operative treatment of recurrent Crohn's disease: a prospective longitudinal study.

    PubMed

    Fichera, Alessandro; Lovadina, Stefano; Rubin, Michele; Cimino, Fabrizio; Hurst, Roger D; Michelassi, Fabrizio

    2006-10-01

    It is believed commonly that Crohn's recurrences always occur at the site of a previous intestinal anastomosis; yet this concept is probably inaccurate and not mindful of the panintestinal nature of the disease. Between October, 1984 and March, 2003, we carried out 1,132 procedures (464 for primary and 668 for recurrent disease) on 981 consecutive patients. Patients in whom we carried out both the original procedure as well as the procedure for recurrent disease constitute this study population. Operative procedures for perineal complications were excluded from this analysis. Data were accrued prospectively. Seventy-eight patients met the study inclusion criteria. They had a total of 149 sites of disease (duodenum, n = 3; jejunum/ileum, n = 53; terminal ileum/neo terminal ileum, n = 67; colon and rectum, n = 26). One hundred thirty-four sites required operative intervention (85 resections and 49 strictureplasties) and 15 did not. Crohn's disease recurred in 79 sites after a mean of 48.4 months (range, 1-161 months, median, 41 months). Site of operative intervention and operative technique influenced patterns of recurrence: when an anastomosis or strictureplasty was constructed with small bowel, the majority of recurrences were limited to the anastomotic line (17/29, 59%); when it was constructed with small bowel and colon, the majority of recurrences extended to the proximal limb (29/35, 83%). The difference in recurrence pattern is significant (P < .01). In addition, fewer recurrences occurred at strictureplasty than resection sites (22/49, 45%, vs 57/85, 70%, respectively, P < .05). At the time of the second procedure, 40 additional recurrences were identified distant from the original operative site. Four of these represented progression of disease at the 15 sites that did not originally need operative intervention. Of 119 total recurrences, 115 required 73 resections, 40 strictureplasties, and 2 other procedures. The site of the original operative intervention is the most common site for recurrence, although as many as one-third of recurrences occur separate from it. Pattern of recurrence is influenced by site of the operative intervention (anastomotic for small bowel, proximal limb for ileocolonic) and by operative technique (fewer recurrences occurred at strictureplasty than resection sites). Disease progression occurred in 25% of the sites not addressed operatively at the original procedure. The operative strategy applied to Crohn's complications in different intestinal sites was similar for primary and recurrent disease.

  7. KSC-2012-6403

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, groundbreaking will begin for the construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  8. Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

    NASA Technical Reports Server (NTRS)

    Hill, J.

    1980-01-01

    A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

  9. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  10. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  11. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  12. 34 CFR 395.31 - Acquisition and occupation of Federal property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... design for such construction, substantial alteration, or renovation includes a satisfactory site or sites for the location and operation of a vending facility by a blind vendor. In those cases where a design... facility to be operated by a blind vendor prior to the completion of the final space layout of the building...

  13. Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D&D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D&D a facility to process low-activity job-controlmore » and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS.« less

  14. 10 CFR 60.61 - Provision of information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... characterization, siting, development, design, licensing, construction, operation, regulation, permanent closure... available at the NRC Web site, http://www.nrc.gov, and/or at the NRC Public Document Room, and copies are...

  15. Environmental projects, volume 11. Environmental assessment: Addition to operations building, Mars site

    NASA Technical Reports Server (NTRS)

    1990-01-01

    An Environmental Assessment was performed of the proposed addition to building G-86 at the Mars Site, which will provide space for new electronic equipment to consolidate the Deep Space Network (DSN) support facilities from other Goldstone Deep Space Communication Complex (GDSCC) sites at the Mars Site, and will include a fifth telemetry and command group with its associated link monitor, control processor, and operator consoles. The addition of these facilities will increase the capability of the DSN to support future sophisticated NASA spacecraft missions such as the International Solar and Terrestrial Physics (ISTP) Program. The planned construction of this building addition requires an Environmental Assessment (EA) document that records the existing environmental conditions at the Mars Site, that analyzes the environmental effects that possibly could be expected from the construction and use of the new building addition, and that recommends measures to be taken to mitigate any possible deleterious environmental effects.

  16. Generic construction of efficient matrix product operators

    NASA Astrophysics Data System (ADS)

    Hubig, C.; McCulloch, I. P.; Schollwöck, U.

    2017-01-01

    Matrix product operators (MPOs) are at the heart of the second-generation density matrix renormalization group (DMRG) algorithm formulated in matrix product state language. We first summarize the widely known facts on MPO arithmetic and representations of single-site operators. Second, we introduce three compression methods (rescaled SVD, deparallelization, and delinearization) for MPOs and show that it is possible to construct efficient representations of arbitrary operators using MPO arithmetic and compression. As examples, we construct powers of a short-ranged spin-chain Hamiltonian, a complicated Hamiltonian of a two-dimensional system and, as proof of principle, the long-range four-body Hamiltonian from quantum chemistry.

  17. Critical management practices influencing on-site waste minimization in construction projects.

    PubMed

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in unsafe behaviors and significant increases in safe behaviors. The results of this case study showed that an approach based on goal setting, feedback, and an effective measure of safety behavior if properly applied by committed management, can improve safety performance significantly in construction site environments. The results proved that the BBS management technique can be applied to any country's culture, showing that it would be a good approach for improving the safety of front-line workers and that it has industry wide application for ongoing construction projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Construction Material-Based Methodology for Military Contingency Base Construction: Case Study of Dhaka, Bangladesh

    DTIC Science & Technology

    2016-08-01

    of the operational environment to anticipate the impacts that siting and operating CBs will have on the local context, and to consider the effects ...17 Figure 7. Density and effective proximity factor (McNulty 2009b...Area-wise consumption of cement, FY2010 (Nahar 2011). ...............................44 Figure 23. Overview of Bangladesh [green: office, orange

  20. Gendered Communities of Practice and the Construction of Masculinities in Turkish Physical Education

    ERIC Educational Resources Information Center

    Atencio, Matthew; Koca, Canan

    2011-01-01

    This paper analyses the construction of masculinities in Turkish physical education through Carrie Paechter's conceptualisation of gendered communities of practice. According to Paechter, educational communities of practice operate as sites of gendered activity. Membership within these communities contributes to the construction of a gendered…

  1. Simulation of value stream mapping and discrete optimization of energy consumption in modular construction

    NASA Astrophysics Data System (ADS)

    Chowdhury, Md Mukul

    With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.

  2. Virtually Out of This World!

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.

  3. On the prevailing construction waste recycling practices: a South East Queensland study.

    PubMed

    Tam, Vivian W Y; Kotrayothar, Duangthidar; Loo, Yew-Chaye

    2009-03-01

    Waste generated from construction and building demolition work constitutes about 68% of all solid waste generated each year in South East Queensland. Consequently, it has created a serious waste management problem. The State Governments of Victoria and New South Wales have been encouraging the use of recycled materials from construction and related waste; they have also promulgated specifications for their use. In Queensland, however, similar regulations are not anticipated in the near future, which explains the lack of funded research conducted in this important arena. This paper presents an evaluation of the prevailing waste recycling practices in Queensland. Nine sites were visited, including two construction sites, three demolition sites, three recycling plants and one landfill in South East Queensland. The difficulties encountered by the recycling programme operators and their associates at these sites are described and the benefits of recycling construction materials are presented. One of the major barriers is that the local councils disallow the use of recycled materials in new construction work. To help rectify these impediments to recycling, recommendations are given to increase the use of recycled construction waste in South East Queensland.

  4. Manual handling of highway kerbs--focus group findings.

    PubMed

    Bust, P D; Gibb, A G F; Haslam, R A

    2005-07-01

    The manual handling of concrete highway kerbs remains commonplace in the construction industry despite obvious risks to operatives. This study was undertaken to find out why kerb installation still includes manual handling, to identify the alternatives that exist and to consider how the organisation of the work affects exposure to risk. Focus groups were held with industry professionals to discuss kerb design, installation and the training of operatives, with site visits and interviews undertaken to place the focus group findings in context. The focus group discussions highlighted manufacturer's "myopia", a lack of installation knowledge of designers and shortfalls in training for installation work. It was concluded that risks to the health of construction workers remain as they are not considered in the design of the product, design of the work or ameliorated by adequate risk assessment. Recommendations from the research are that a pro-active approach to health needs to be adopted by the manufacturers of heavy construction products. Designers of work requiring the use of heavy products need to have more experience of site operations, and education and training in manual handling is desirable at all levels in construction organisations.

  5. 10 CFR 100.2 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Scope. 100.2 Section 100.2 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) REACTOR SITE CRITERIA § 100.2 Scope. The siting requirements contained in this part apply to applications for site approval for the purpose of constructing and operating stationary power...

  6. Evaluation of hot in-place recycle.

    DOT National Transportation Integrated Search

    2010-06-01

    This report documents the construction of hot in-place recycled (HIPR) pavement on SR 542. : HIPR is a process by which rehabilitation of the existing HMA pavement occurs on site in one : operation. HIPR project selection, mix design, construction an...

  7. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  8. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...

  9. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...

  10. A methodology to quantitatively evaluate the safety of a glazing robot.

    PubMed

    Lee, Seungyeol; Yu, Seungnam; Choi, Junho; Han, Changsoo

    2011-03-01

    A new construction method using robots is spreading widely among construction sites in order to overcome labour shortages and frequent construction accidents. Along with economical efficiency, safety is a very important factor for evaluating the use of construction robots in construction sites. However, the quantitative evaluation of safety is difficult compared with that of economical efficiency. In this study, we suggested a safety evaluation methodology by defining the 'worker' and 'work conditions' as two risk factors, defining the 'worker' factor as posture load and the 'work conditions' factor as the work environment and the risk exposure time. The posture load evaluation reflects the risk of musculoskeletal disorders which can be caused by work posture and the risk of accidents which can be caused by reduced concentration. We evaluated the risk factors that may cause various accidents such as falling, colliding, capsizing, and squeezing in work environments, and evaluated the operational risk by considering worker exposure time to risky work environments. With the results of the evaluations for each factor, we calculated the general operational risk and deduced the improvement ratio in operational safety by introducing a construction robot. To verify these results, we compared the safety of the existing human manual labour and the proposed robotic labour construction methods for manipulating large glass panels. Copyright © 2010 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  11. KSC-2012-6405

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Using ceremonial shovels to mark the site, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  12. UMTRA project water sampling and analysis plan, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  13. 15 CFR 921.80 - Application information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... awards for preacquisition, acquisition and development, operation and management, and special education...-site selection, operation and management, research, and education and interpretive awards. The... projects, or restorative activities involving construction, must include a preliminary engineering report...

  14. 47 CFR 27.1170 - Payment Issues.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Microwave Relocation from the 2110-2150 Mhz and 2160-2200 Mhz Bands § 27.1170 Payment Issues. Prior to initiating operations for a newly constructed site or modified existing site, an AWS entity or MSS/ATC entity is required to file a notice containing site-specific data with the clearinghouse. The notice...

  15. 47 CFR 27.1170 - Payment Issues.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... initiating operations for a newly constructed site or modified existing site, an AWS entity or MSS/ATC entity... prior coordination notice (PCN) under § 101.103(d) of this chapter is prepared, AWS entities can satisfy the site-data filing requirement by submitting a copy of their PCN to the clearinghouse. AWS entities...

  16. Hazardous Waste Cleanup: USDOE Knolls Atomic Power Laboratory in Niskayuna, New York

    EPA Pesticide Factsheets

    The Knolls site is located at 2401 River Road in the Town of Niskayuna, Schenectady County, New York, on the south bank of the Mohawk River. Construction of the site began in 1948 and laboratory operations began in 1949. The site consists of 170 acres of

  17. Brentwood Lessons Learned Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl H.; Caton, Melanie C.; Ainscough, Christopher D.

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modularmore » hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.« less

  18. Lease Operations Environmental Guidance Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bureau of Land Management

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  19. Respirable Crystalline Silica Exposures During Asphalt Pavement Milling at Eleven Highway Construction Sites

    PubMed Central

    Hammond, Duane R.; Shulman, Stanley A.; Echt, Alan S.

    2016-01-01

    Asphalt pavement milling machines use a rotating cutter drum to remove the deteriorated road surface for recycling. The removal of the road surface has the potential to release respirable crystalline silica, to which workers can be exposed. This paper describes an evaluation of respirable crystalline silica exposures to the operator and ground worker from two different half-lane and larger asphalt pavement milling machines that had ventilation dust controls and water-sprays designed and installed by the manufacturers. Manufacturer A completed milling for eleven days at four highway construction sites in Wisconsin, while Manufacturer B completed milling for ten days at seven highway construction sites in Indiana. To evaluate the dust controls, full-shift personal breathing zone air samples were collected from an operator and ground worker during the course of normal employee work activities of asphalt pavement milling at eleven different sites. Forty-two personal breathing zone air samples were collected over 21 days (sampling on an operator and ground worker each day). All samples were below 50 µg/m3 for respirable crystalline silica, the National Institute for Occupational Safety and Health recommended exposure limit. The geometric mean personal breathing zone air sample was 6.2 µg/m3 for the operator and 6.1 µg/m3 for the ground worker for the Manufacturer A milling machine. The geometric mean personal breathing zone air sample was 4.2 µg/m3 for the operator and 9.0 µg/m3 for the ground worker for the Manufacturer B milling machine. In addition, upper 95% confidence limits for the mean exposure for each occupation were well below 50 µg/m3 for both studies. The silica content in the bulk asphalt material being milled ranged from 7% to 23% silica for roads milled by Manufacturer A and from 5% to 12% silica for roads milled by Manufacturer B. The results indicate that engineering controls consisting of ventilation controls in combination with water-sprays are capable of controlling occupational exposures to respirable crystalline silica generated by asphalt pavement milling machines on highway construction sites. PMID:26913983

  20. Respirable crystalline silica exposures during asphalt pavement milling at eleven highway construction sites.

    PubMed

    Hammond, Duane R; Shulman, Stanley A; Echt, Alan S

    2016-07-01

    Asphalt pavement milling machines use a rotating cutter drum to remove the deteriorated road surface for recycling. The removal of the road surface has the potential to release respirable crystalline silica, to which workers can be exposed. This article describes an evaluation of respirable crystalline silica exposures to the operator and ground worker from two different half-lane and larger asphalt pavement milling machines that had ventilation dust controls and water-sprays designed and installed by the manufacturers. Manufacturer A completed milling for 11 days at 4 highway construction sites in Wisconsin, and Manufacturer B completed milling for 10 days at 7 highway construction sites in Indiana. To evaluate the dust controls, full-shift personal breathing zone air samples were collected from an operator and ground worker during the course of normal employee work activities of asphalt pavement milling at 11 different sites. Forty-two personal breathing zone air samples were collected over 21 days (sampling on an operator and ground worker each day). All samples were below 50 µg/m(3) for respirable crystalline silica, the National Institute for Occupational Safety and Health recommended exposure limit. The geometric mean personal breathing zone air sample was 6.2 µg/m(3) for the operator and 6.1 µg/m(3) for the ground worker for the Manufacturer A milling machine. The geometric mean personal breathing zone air sample was 4.2 µg/m(3) for the operator and 9.0 µg/m(3) for the ground worker for the Manufacturer B milling machine. In addition, upper 95% confidence limits for the mean exposure for each occupation were well below 50 µg/m(3) for both studies. The silica content in the bulk asphalt material being milled ranged from 7-23% silica for roads milled by Manufacturer A and from 5-12% silica for roads milled by Manufacturer B. The results indicate that engineering controls consisting of ventilation controls in combination with water-sprays are capable of controlling occupational exposures to respirable crystalline silica generated by asphalt pavement milling machines on highway construction sites.

  1. Environmental projects, volume 10. Environmental assessment: New 34-meter antenna at Apollo site

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The Goldstone Deep Space Communications Complex (GDSCC) is part of NASA's Deep Space Network (DSN), one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. A detailed description of the GDSCC is presented. At present the Venus Station has an unused 9-meter antenna and a 26-meter (85 ft) antenna known as DSS-13. Construction of a new 34-meter (111.5 ft) antenna at the Venus site is under way to replace the present DSS-13 26-meter antenna. The proposed construction at the Apollo Site of a new, high efficiency, 34-meter, multifrequency beam waveguide-type antenna to replace the aging, 20-year old, DSS-12 34-meter antenna located at the Echo Site is analyzed. This new 34-meter antenna, to be constructed at the Apollo Site and to be known as DSS-18, will be of a design similar to the new DSS-13 34-meter antenna now being constructed at the Venus Site. When the new 34-meter antenna is completed and operational at the Apollo Site (planned for 1993), the old DSS-12 34-meter antenna at the Echo Site will be decommissioned, dismantled, and removed.

  2. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  3. KSC-2012-6409

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers continue construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  4. KSC-2012-6406

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers continue construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  5. Seasonal variability of near surface soil water and groundwater tables in Florida : phase II [summary].

    DOT National Transportation Integrated Search

    2008-01-01

    Reliable predictions of the seasonal high : groundwater table (SHGWT) at potential : construction sites are critical for roadway : designs. Maximum SHGWT levels can affect the : construction and maintenance of roads, and : the design and operation of...

  6. Construction equipment and motor vehicle related injuries on construction sites in Turkey.

    PubMed

    Gürcanli, G Emre; Müngen, Ugur; Akad, Murat

    2008-08-01

    Research on occupational accidents on construction sites in Turkey is very few. Moreover, research on motor vehicle and equipment accidents also do not exist. Investigation in the scope of this study shows that after falls and contact with electricity, accidents involving heavy equipment and motor vehicles rank third and fourth, respectively. This study aims to reveal the characteristics of these types of accidents, deduct the prominent causes that lead to fatalities as well as permanent disabilities using the present data. With the aid of obtained results, recommendations are made for safety experts on how to derive data from insufficient sources in Turkey and to evaluate these data for prevention and mitigation of the risks that construction workers are exposed to. 168 fatal and 38 non-fatal traffic accident-caused incidents as well as 206 fatal and 97 non-fatal construction equipment accidents, which were selected from official statistics and expert reports, were taken into consideration. Analysis and classification of these accidents were done according to the way they happened, the type of construction site and the occupation of the victims. Moreover, the leading causes of fatal and non-fatal injuries, to which drivers, operators and co-operators are exposed, are presented. Critical findings concerning prominent ways of occurrence, type of construction work and occupation are presented; and a number of measures for reducing the present risks are suggested. Some approaches for analysing relevant data are proposed for further research.

  7. Quantifying Construction Site Sediment Discharge Risk and Treatment Potential

    NASA Astrophysics Data System (ADS)

    Ferrell, L.; Beighley, R. E.

    2006-12-01

    Dealing with soil erosion and sediment transport can be a significant challenge during the construction process due to the potentially large spatial and temporal extent and conditions of bare soils. Best Management Practices (BMP) are commonly used to eliminate or reduce offsite discharge of sediment. However, few efforts have investigated the time varying risk of sediment discharge from construction sites, which often have dynamic soil conditions and the potential for less than optimal BMP installations. The goal of this research is to improve the design, implementation and effectiveness of sediment and erosion control at construction sites using site specific, temporal distributions of sediment discharge risk. Sediment risk is determined from individual factors leading to sediment expert, such as rainfall frequency, the adequacy of BMP installations, and the extent and duration of bare soil conditions. This research specifically focuses on quantifying: (a) the effectiveness of temporary sediment and control erosion control BMPs in preventing, containing, and/or treating construction site sediment discharge at varying levels of "proper" installation, and (b) sediment discharge potential from construction sites during different phases of construction, (ex., disturbed earth operations). BMPs are evaluated at selected construction sites in southern California and at the Soil Erosion Research Laboratory (SERL) in the Civil and Environmental Engineering department at San Diego State University. SERL experiments are performed on a 3-m by 10-m tilting soil bed with soil depths up to 1 meter, slopes ranging from 0 to 50 percent, and rainfall rates up to 150 mm/hr (6 in/hr). BMP performance is assessed based on experiments where BMPs are installed per manufacture specifications, potential less than optimal installations, and no treatment conditions. Soil conditions are also varied to represent site conditions during different phases of construction (i.e., loose lifts, stock piles, temporary roads, finished grade, others). Preliminary site monitoring, experimental results, and a conceptual model for estimating the time depend risk of sediment discharge over the duration of a construction project are presented.

  8. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  9. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  10. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID FOR THE ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... design and construction criteria and shall apply to all Establishment, Expansion, and Improvement...

  11. EMISSION MEASUREMENTS OF PARTICLE MASS AND SIZE EMISSION PROFILES FROM CONSTRUCTION ACTIVITIES

    EPA Science Inventory

    The report gives results from field tests that characterize the amount and size distribution of particulate matter (PM) emissions from operations at construction sites. Of particular interest is the movement of earth by scraper loading and unloading, grading, transit vehicular m...

  12. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... performed by designated employees. (2) Precaution shall be taken to prevent accidental operation of relays... removed for construction purposes, a temporary fence affording similar protection when the site is...

  13. 29 CFR 1926.957 - Construction in energized substations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... performed by designated employees. (2) Precaution shall be taken to prevent accidental operation of relays... removed for construction purposes, a temporary fence affording similar protection when the site is...

  14. Integrated Management of all Historical, Operational and Future Decomissioning Solid ILW at Dounreay

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graham, D.

    This paper describes major components of the Dounreay Site Restoration Plan, DSRP to deal with the site's solid intermediate level waste, ILW legacy. Historic solid ILW exists in the Shaft (disposals between 1959 and 1977), the Wet Silo (operated between 1973 and 1998), and in operating engineered drummed storage. Significant further arisings are expected from future operations, post-operations clean out and decommissioning through to the completion of site restoration, expected to be complete by about 2060. The raw waste is in many solid forms and also incorporates sludge, some fissile material and hazardous chemical components. The aim of the Solidmore » ILW Project is to treat and condition all this waste to make it passively safe and in a form which can be stored for a substantial period, and then transported to the planned U.K. national deep repository for ILW disposal. The Solid ILW Project involves the construction of head works for waste retrieval operations at the Shaft and Wet Silo, a Waste Treatment Plant and a Conditioned Waste Store to hold the conditioned waste until the disposal facilities become available. In addition, there are infrastructure activities to enable the new construction: contaminated ground remediation, existing building demolition, underground and overground services diversion, sea cliff stabilization, and groundwater isolation at the Shaft.« less

  15. Facilities Standardization: Improving a Successful Program

    DTIC Science & Technology

    1992-02-01

    Garden City, NY 11530 (516) 222-4714 A-3 Burger King Corporation Buzz Alexander, Director Construction Services 17777 Old Cutler Road Miami, FL 33157...image. B-3 BURGER KING CORPORATION Burger King operates one of the largest fast food outlets in North America. The company has between 3,000 and 5,000...sites, with an annual construction rate of 220 stores per year. About 85 percent of its restaurants are franchises and the rest are company operated

  16. 15. VIEW LOOKING EAST AT UNDERGROUND VAULT, BUILDING 997, UNDER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. VIEW LOOKING EAST AT UNDERGROUND VAULT, BUILDING 997, UNDER CONSTRUCTION. THE VAULTS WERE USED TO STORE TRIGGERS AWAITING OFF-SITE SHIPMENT, OR RETURNED TRIGGERS AWAITING TO BE TRANSPORTED TO A BUILDING FOR RECOVERY OF THE PLUTONIUM. THE VAULT WALLS WERE CONSTRUCTED 14.5 FEET THICK. BUILDING 991, IN THE BACKGROUND, WAS THE FIRST OPERATIONAL BUILDING ON SITE (2/1/52). - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO

  17. KSC-2012-6408

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a worker continues construction of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM, system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  18. 10 CFR 960.5-1 - System guidelines.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORY Preclosure Guidelines § 960.5-1 System guidelines. (a) Qualifying conditions—(1) Preclosure... radioactive materials to restricted and unrestricted areas during repository operation and closure shall meet... repository siting, construction, operation, closure, and decommissioning the public and the environment shall...

  19. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zeitoun, A.

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, bothmore » normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.« less

  20. 7 CFR 658.3 - Applicability and exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... construction of on-farm structures necessary for farm operations. Federal agencies can obtain assistance from... structures and sites converted prior to the time of an application for assistance from a Federal agency, including assistance and actions related to the construction of minor new ancillary structures (such as...

  1. 7 CFR 658.3 - Applicability and exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... construction of on-farm structures necessary for farm operations. Federal agencies can obtain assistance from... structures and sites converted prior to the time of an application for assistance from a Federal agency, including assistance and actions related to the construction of minor new ancillary structures (such as...

  2. 7 CFR 658.3 - Applicability and exemptions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... construction of on-farm structures necessary for farm operations. Federal agencies can obtain assistance from... structures and sites converted prior to the time of an application for assistance from a Federal agency, including assistance and actions related to the construction of minor new ancillary structures (such as...

  3. 7 CFR 658.3 - Applicability and exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... construction of on-farm structures necessary for farm operations. Federal agencies can obtain assistance from... structures and sites converted prior to the time of an application for assistance from a Federal agency, including assistance and actions related to the construction of minor new ancillary structures (such as...

  4. 7 CFR 658.3 - Applicability and exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction of on-farm structures necessary for farm operations. Federal agencies can obtain assistance from... structures and sites converted prior to the time of an application for assistance from a Federal agency, including assistance and actions related to the construction of minor new ancillary structures (such as...

  5. 10 CFR 72.98 - Identifying regions around an ISFSI or MRS site.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... WASTE Siting Evaluation Factors § 72.98 Identifying regions around an ISFSI or MRS site. (a) The... ISFSI or MRS must be identified. (b) The potential regional impact due to the construction, operation or decommissioning of the ISFSI or MRS must be identified. The extent of regional impacts must be determined on the...

  6. 10 CFR 72.98 - Identifying regions around an ISFSI or MRS site.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... WASTE Siting Evaluation Factors § 72.98 Identifying regions around an ISFSI or MRS site. (a) The... ISFSI or MRS must be identified. (b) The potential regional impact due to the construction, operation or decommissioning of the ISFSI or MRS must be identified. The extent of regional impacts must be determined on the...

  7. 10 CFR 60.17 - Contents of site characterization plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.17 Contents of site characterization plan. The... construction authorization for a geologic repository operations area; (4) Criteria, developed pursuant to... area for the location of a geologic repository; and (5) Any other information which the Commission, by...

  8. On the Seismic Safety of Nuclear Power Plant Sites in South Korea

    NASA Astrophysics Data System (ADS)

    Choi, H.; Park, S.; Yang, J.; Shim, T.; Im, C. B.

    2016-12-01

    The Korean Peninsula is located at the far eastern part of Eurasian Plate, and within the intra-plate region several hundred km away from the nearest plate boundary. The earthquakes around the Korean Peninsula show the typical characteristics of intra-plate earthquakes. So to speak, those are low seismicity, relatively smaller magnitude than that of inter-plate earthquakes, and spatially irregular epicenters. There are 24 nuclear power plants (NPPs) in operation, 4 NPPs in completion of construction, and 4 NPPs in preparation of construction in South Korea. Even though the seismicity of the Korean Peninsula is known as relatively low, but because there are more than 30 NPPs within not so large territory, thorough the preparedness of NPPs' safety against earthquakes is required. The earthquake preparedness of NPPs in South Korea is composed of 4 stages: site election, design, construction and operation. Since regulatory codes and standards are strictly applied in each stage, the NPPs in South Korea are believed to be safe enough against the maximum potential earthquake ground motion. Through data analysis on geological and seismological characteristics of the region within a radius of 320 km from the site and the detailed geological survey of the area within a radius of 8 km from the site, the design earthquake ground motion of NPPs in South Korea is determined to be 0.2g (in case of newly constructed NPPs is 0.3g) considering the maximum potential earthquake ground motion and some safety margin. The ground motions and surface deformation caused by capable faults are also considered in the seismic design of NPPs. In addition, the Korea Institute of Nuclear Safety as a regulatory technical expert organization, has been operating independent real time earthquake monitoring network as a part of securing the seismic safety of NPP sites in South Korea since late 1990's. If earthquakes with more than magnitude 3.0 are occurred in the Korean Peninsula or the peak ground motions with more than 0.01g are occurred in NPP sites, such information is reported to the government and shared to the public through the website including the information of the seismic safety of NPP sites.

  9. 40 CFR 144.33 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... characteristics; (2) Within the same well field, facility site, reservoir, project, or similar unit in the same...) The requirements for construction, monitoring, reporting, operation, and abandonment, for all wells...; and (3) The cumulative effects of drilling and operation of additional injection wells are considered...

  10. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  11. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  12. KSC-2012-6404

    NASA Image and Video Library

    2012-09-20

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, a groundbreaking was held to mark the start of construction on the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. Holding ceremonial shovels, from left are Michael Le, lead design engineer and construction manager Sue Vingris, Cape Design Engineer Co. project manager Kannan Rengarajan, chief executive officer of Cape Design Engineer Co. Lutfi Mized, president of Cape Design Engineer Co. David Roelandt, construction site superintendent with Cape Design Engineer Co. Marc Seibert, NASA project manager Michael Miller, NASA project manager Peter Aragona, KSC’s Electromagnetic Lab manager Stacy Hopper, KSCs master planning supervisor Dr. Bary Geldzabler, NASA chief scientist and KSC’s Chief Technologist Karen Thompson. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers will begin construction on the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and prepare the site for the operations command center facility. Photo credit: NASA/Charisse Nahser

  13. Hazardous Waste Cleanup: Clean Earth of North Jersey Incorporated in Kearny, New Jersey

    EPA Pesticide Factsheets

    The Clean Earth of North Jersey, Inc. (CENJ) site is located on approximately six acres of land in Kearny, Hudson County, New Jersey. The site has been used for a variety of purposes throughout its operational history, including storage of construction

  14. Environmental assessment for the Plating Shop Replacement, Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The existing of Y-12 Plant Plating Shop provides vital support functions for the US Department of Energy (DOE) Defense Programs operations. In addition to weapon component plating, the facility performs other plating services to support existing operations for the Y-12 Plant, other DOE facilities, and other federal agencies. In addition, the facility would also provide essential deplating services for weapons reclamation and teardown. The existing Y-12 Plant Plating Shop is presently located in a structure which is rapidly deteriorating and obsolete. The existing building structure was originally designed to house a steam plant, not chemical plating operations. As such, vaporsmore » from plating operations have deteriorated the structure to a point where a new facility is needed for continued safe operations. The potential environmental impacts of the proposed action was anticipated to be minimal and would affect no environmentally sensitive areas. Some short-term construction- and demolition-related effects would occur in an already highly industrialized setting. These include temporarily disturbing 72,000 square feet of land for the new plating shop and related site preparation activities, constructing a permanent building on part of the area, and using 80 construction personnel over a period of 18 months for site preparation and construction. Demolition effects vary depending on the environmentally suitable option selected, but they could involve as much as 262 cubic yards of concrete rubble and approximately 1600 cubic yards of soil disposed as waste. Either 1600 cubic yards of fresh soil or 1850 yards of clay and fresh soil could be required. Soil erosion would be minimal. Approximately 20 construction personnel would be involved for 12 months in demolition activities.« less

  15. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    DTIC Science & Technology

    2012-05-22

    Planning 14 and airfields. Don’t want to clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base...clean up a site to use i t. Too risky, takes CREDIT 2 Brownfield Redevelopment no Planning N/A too long. Base camp site location is chosen based on

  16. Basic repository environmental assessment design basis, Lavender Canyon site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    This study examines the engineering factors and costs associated with the construction, operation, and decommissioning of a high-level nuclear waste repository in salt in the Paradox Basin in Lavender Canyon, Utah. The study assumes a repository capacity of 36,000 metric tons of heavy metal (MTHM) of unreprocessed spent fuel and 36,000 MTHM of commercial high-level reprocessing waste, along with 7020 canisters of defense high-level reprocessing waste and associated quantities of remote- and contact-handled transuranic waste (TRU). With the exception of TRU, all the waste forms are placed in 300- to 1000-year-life carbon-steel waste packages in a collocated waste handling andmore » packaging facility (WHPF), which is also described. The construction, operation, and decommissioning of the proposed repository is estimated to cost approximately $5.51 billion. Costs include those for the collocated WHPP, engineering, and contingency, but exclude waste form assembly and shipment to the site and waste package fabrication and shipment to the site. These costs reflect the relative average wage rates of the region and the relatively sound nature of the salt at this site. Construction would require an estimated 7.75 years. Engineering factors and costs are not strongly influenced by environmental considerations. 51 refs., 24 figs., 20 tabs.« less

  17. 47 CFR 27.1186 - Payment issues.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... set forth in § 27.1170. If an AWS licensee is initiating operations for a newly constructed site or modified existing site in licensed bands overlapping the 2150-2160/62 MHz band, the AWS licensee must file... level height of the transmitting antenna centerline. AWS entities have a continuing duty to maintain the...

  18. 47 CFR 27.1186 - Payment issues.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... set forth in § 27.1170. If an AWS licensee is initiating operations for a newly constructed site or modified existing site in licensed bands overlapping the 2150-2160/62 MHz band, the AWS licensee must file... level height of the transmitting antenna centerline. AWS entities have a continuing duty to maintain the...

  19. Real-time, interactive, visually updated simulator system for telepresence

    NASA Technical Reports Server (NTRS)

    Schebor, Frederick S.; Turney, Jerry L.; Marzwell, Neville I.

    1991-01-01

    Time delays and limited sensory feedback of remote telerobotic systems tend to disorient teleoperators and dramatically decrease the operator's performance. To remove the effects of time delays, key components were designed and developed of a prototype forward simulation subsystem, the Global-Local Environment Telerobotic Simulator (GLETS) that buffers the operator from the remote task. GLETS totally immerses an operator in a real-time, interactive, simulated, visually updated artificial environment of the remote telerobotic site. Using GLETS, the operator will, in effect, enter into a telerobotic virtual reality and can easily form a gestalt of the virtual 'local site' that matches the operator's normal interactions with the remote site. In addition to use in space based telerobotics, GLETS, due to its extendable architecture, can also be used in other teleoperational environments such as toxic material handling, construction, and undersea exploration.

  20. Conoco's new approach to drill site construction in difficult, remote, swamp and jungle terrain Irian Jaya, Indonesia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roodriguez, F.H.

    1984-02-01

    In October 1982, Conoco Irian Jaya as operator: and partners: Pertamina, Inpex Bintuni Limited, and Moeco Irian Jaya Company, mobilized construction equipment from Singapore to the KBS ''A'' contract area in Irian Jaya, Indonesia for the purpose of constructing a base camp and drill three exploratory sites. What made this construction effort different from others previously used in Irian Jaya; was that it incorporated several new and unique features, namely: a turnkey approach to construction; that is Conoco providing complete set of specifications and conditions with contractor assuming risks for a lump sum payment; special equipment designed by contractor formore » Irian Jaya operations; an incentive to co pensate or penalize contractor for helicopter hours flown below or above a predetermined number; structural steel pile platform designs for two swamp locations (Ayot and Aum), as opposed to the more conventional corduroy timber log-plank arrangement; and drilling rig pads designed for specific heli-rig with limited extra space. All work was successfully completed within the time frame stipulated in the contract, that is five months from the time the contractor was notified to begin mobilization of equipment, materials and personnel.« less

  1. 75 FR 29420 - Revision of LNG and LHG Waterfront Facility General Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-26

    ... exclusive authority to approve or deny an application for the siting, construction, expansion, or operation... a Follow-on WSA will be submitted to the U.S. Coast Guard no later than the filing of an application... least 180 days before the applicant files an application for authorization to construct the facility...

  2. 12 CFR 584.2-1 - Prescribed services and activities of savings and loan holding companies.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... and operation of storage facilities for microfilm or other duplicate records; and (vii) Advertising... construction, or (iii) Use as mobile home sites; (5) Development, subdivision and construction of improvements...) Acquisition of improved real estate and mobile homes to be held for rental; (7) Acquisition of improved real...

  3. 1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.

    DTIC Science & Technology

    1981-02-02

    7a t i onai I F ran, Ton I a tor N1anagernen t of Con strin t ion The,,,a uruts Com p iIa t i 4- 65 BIOGRAPH I C INFORMAIION PORN ,- CI.ogclier, Robc...Construction Cost Analysis of Cost-Flow Curves in Construction Unproductive Time in Building Operations Video Tape Recording for Site Studies optimization of

  4. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  5. 10 CFR 2.1115 - Designation of issues for adjudicatory hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...

  6. Library Off-Site Shelving: Guide for High-Density Facilities.

    ERIC Educational Resources Information Center

    Nitecki, Danuta A., Ed.; Kendrick, Curtis L., Ed.

    This collection of essays addresses the planning, construction, and operating issues relating to high-density library shelving facilities. The volume covers essential topics that address issues relating to the building, its operations, and serving the collections. It begins with an introduction by the volume's editors, "The Paradox and…

  7. Evaluating Best Management Practices and Correlations Between Culture and Molecular Data at a Cattle Feeding Operation and Nearby Stream

    EPA Science Inventory

    Presentation will include: Evaluate the performance of an infiltration basin and constructed wetland in a cattle-feeding operation (culture data only); Examine the correlation between culture data and qPCR measurements at two different research sites; Describe the relationship b...

  8. Submillimeter atmospheric FTS at the geographic South Pole

    NASA Astrophysics Data System (ADS)

    Chamberlin, Richard A.; Martin, Robert N.; Martin, Christopher L.; Stark, Antony A.

    2003-02-01

    A submillimeter Fourier Transform Spectrometer of the Martin-Puplett type was constructed and deployed to the geographical South Pole in 2001. The instrument operates from about 300 GHz to almost 2 THz and was used over winter to acquire atmospheric spectra with resolution as fine as 250 MHz. The main motivation for constructing and deploying this FTS was for astronomical site testing, but the obtained spectra can have important secondary uses in atmospheric science and transmission model validation. Some preliminary, low spectral resolution site testing results are presented here.

  9. Cleanup Verification Package for the 118-F-1 Burial Ground

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. J. Farris and H. M. Sulloway

    2008-01-10

    This cleanup verification package documents completion of remedial action for the 118-F-1 Burial Ground on the Hanford Site. This burial ground is a combination of two locations formerly called Minor Construction Burial Ground No. 2 and Solid Waste Burial Ground No. 2. This waste site received radioactive equipment and other miscellaneous waste from 105-F Reactor operations, including dummy elements and irradiated process tubing; gun barrel tips, steel sleeves, and metal chips removed from the reactor; filter boxes containing reactor graphite chips; and miscellaneous construction solid waste.

  10. Draft environmental impact statement: Space Shuttle Advanced Solid Rocket Motor Program

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRM's. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site.

  11. Directions for lunar construction - A derivation of requirements from a construction scenario analysis

    NASA Technical Reports Server (NTRS)

    Dias, William S.; Matijevic, Jacob R.; Venkataraman, Subramani T.; Smith, Jeffrey H.; Lindemann, Randel A.; Levin, Richard R.

    1992-01-01

    This paper provides an initial trade-off study among several lunar construction options available to the Space Exploration Initiative. The relative time effectiveness of Extra-Vehicular Activity (EVA), Intra-Vehicular Activity (IVA), and Earth-based remote control assembly and construction methods are studied. Also considered is whether there is any construction time savings to building roads in advance, or surveying the construction sites with orbiters or rovers in advance. The study was conducted by adding detail to a potentially real scenario - a nuclear power plant - and applying time multipliers for the various control options and terrain alternatives, provided by roboticists among the authors. The authors conclude that IVA is a faster construction method than either EVA or construction conducted remotely from Earth. Surveying proposed sites in advance, with orbiters and rovers, provides a significant time savings through adding to certainty, and therefore may be cost effective. Developing a heavy-lift launch capability and minimizing assembly and construction processes by landing large payloads is probably worthwhile to the degree possible, as construction activities would use a large amount of surface operations time.

  12. Passive Treatment And Monitoring At The Standard Mine Superfund Site, Crested Butte, CO (Presentation)

    EPA Science Inventory

    At the 2008 ASMR conference, data from the initial two months of operation of a U.S. EPA pilot biochemical reactor (BCR) was reported. The BCR was designed and constructed in August, 2007 to treat mining influenced water (MIW) emanating from an adit at a remote site in southern ...

  13. Passive Treatment And Monitoring At The Standard Mine Superfund Site, Crested Butte, CO

    EPA Science Inventory

    At the 2008 ASMR conference, data from the initial two months of operation of a U.S. EPA pilot biochemical reactor (BCR) was reported. The BCR was designed and constructed in August, 2007 to treat mining influenced water (MIW) emanating from an adit at a remote site in southern ...

  14. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Definitions. 100.3 Section 100.3 Energy NUCLEAR REGULATORY... means a combined construction permit and operating license with conditions for a nuclear power facility..., issued pursuant to subpart A of part 52 of this chapter, for a site or sites for one or more nuclear...

  15. Satellite Power Systems (SPS) concept definition study, exhibit C. Volume 5: Special emphasis studies

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1979-01-01

    Specific areas were analyzed and identified as high priority for more in-depth analysis. These areas were: (1) rectenna constructability; (2) satellite constructability; (3) support systems constructability; (4) space environmental analysis, and (5) special end-to-end analyses. Baseline requirements specified coplanar solar blankets and an end mounted antenna, utilizing either GaAlAs solar cells and employing a CR of 2, or Si cells. Several configurations were analyzed. Utilizing the preferred configuration as a baseline, a satellite construction base was defined, precursor operations incident to establishment of orbital support facilities identified, and the satellite construction sequence and procedures developed. Since the baseline specifies sixty instead of one hundred and twenty satellites to be constructed in a thirty year period, mass flow to orbit requirements were revised and new traffic models established. Launch site requirements (exclusive of actual launch operations) in terms of manpower and building space were defined.

  16. Effects of urbanization, construction activity, management practices, and impoundments on suspended-sediment transport in Johnson County, northeast Kansas, February 2006 through November 2008

    USGS Publications Warehouse

    Lee, Casey J.; Ziegler, Andrew C.

    2010-01-01

    The U.S. Geological Survey, in cooperation with the Johnson County, Kansas, Stormwater Management Program, investigated the effects of urbanization, construction activity, management practices, and impoundments on suspended-sediment transport in Johnson County from February 2006 through November 2008. Streamgages and continuous turbidity sensors were operated at 15 sites within the urbanizing 57-square-mile Mill Creek Basin, and 4 sites downstream from the other largest basins (49 to 66 square miles) in Johnson County. The largest sediment yields in Johnson County were observed downstream from basins with increased construction activity. Sediment yields attributed to the largest (68 acre) active construction site in the study area were 9,300 tons per square mile in 2007 and 12,200 tons per square mile in 2008; 5 to 55 times larger than yields observed at other sampling sites. However, given erodible soils and steep slopes at this site, sediment yields were relatively small compared to the range in historic values from construction sites without erosion and sediment controls in the United States (2,300 to 140,000 tons per square mile). Downstream from this construction site, a sediment forebay and wetland were constructed in series upstream from Shawnee Mission Lake, a 120-acre reservoir within Shawnee Mission Park. Although the original intent of the sediment forebay and constructed wetland were unrelated to upstream construction, they were nonetheless evaluated in 2008 to characterize sediment removal before stream entry into the lake. The sediment forebay was estimated to reduce 33 percent of sediment transported to the lake, whereas the wetland did not appear to decrease downstream sediment transport. Comparisons of time-series data and relations between turbidity and sediment concentration indicate that larger silt-sized particles were deposited within the sediment forebay, whereas smaller silt and clay-sized sediments were transported through the wetland and into the lake. Data collected at sites up and downstream from the constructed wetland indicated that hydraulic retention alone did not substantially reduce sediment loading to Shawnee Mission Lake. Mean-daily turbidity values at sampling sites downstream from basins with increased construction activity were compared to U.S. Environmental Protection Agency turbidity criteria designed to reduce discharge of pollutants from construction sites. The U.S. Environmental Protection Agency numeric turbidity criteria specifies that effluent from construction sites greater than 20 acres not exceed a mean-daily turbidity value of 280 nephelometric turbidity units beginning in 2011; this criteria will apply to sites greater than 10 acres beginning in 2014. Although numeric criteria would not have been applicable to data from sampling sites in Johnson County because they were not directly downstream from construction sites and because individual states still have to determine additional details as to how this criteria will be enforced, comparisons were made to characterize the potential of construction site effluent in Johnson County to exceed U.S. Environmental Protection Agency Criteria, even under extensive erosion and sediment controls. Numeric criteria were exceeded at sampling sites downstream from basins with increased construction activity for multiple days during the study period, potentially indicating the need for additional erosion and sediment controls and (or) treatment to bring discharges from construction sites into compliance with future numeric turbidity criteria. Among sampling sites in the Mill Creek Basin, sediment yields from the urbanizing Clear Creek Basin were approximately 2 to 3 times those from older, more stable urban or rural basins. Sediments eroded from construction sites adjacent to or surrounding streams appear to be more readily transported downstream, whereas sediments eroded from construction sites in headwater areas are more likely to

  17. An investigation and analysis of safety issues in Polish small construction plants.

    PubMed

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety.

  18. An investigation and analysis of safety issues in Polish small construction plants

    PubMed Central

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety. PMID:26694002

  19. Theory, construction and operation of simple tensiometers.

    USGS Publications Warehouse

    Stannard, D.I.

    1986-01-01

    The tensiometer presented here in detail is suited to diverse on-site applications. Constructed from readily available, inexpensive parts, it can measure as much as 0.85 bar of tension. Design features include a flushing system for removal of entrapped air or mercury, and an easily maintained modular network of nylon manometers and water-supply tubes. -from Author

  20. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  1. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oostrom, Martinus; Vail, Lance W.

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction andmore » operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.« less

  2. A physiological exploration on operational stance and occupational musculoskeletal problem manifestations amongst construction labourers of West Bengal, India.

    PubMed

    Chatterjee, Arijit; Sahu, Subhashis

    2018-03-29

    A huge number of labourers engaged in construction industry in India both in organized and unorganized sectors. The construction labourers most often work for an extended period of time and they are compelled to uphold altered static and dynamic operational stance in awkward positions during the complete period of work which raises the demand on the musculoskeletal system and may lead to work related musculoskeletal disorders (WRMSDs). This study is intended to explore the operational stance and occupation related musculoskeletal manifestations amongst the construction labourers. One sixty four male labourers from different construction sites of West Bengal was randomly taken for this study. A modified Nordic questionnaire on MSD and the 12 item General Health Questionnaire (GHQ12) were administered on the construction labourers. Rapid Entire Body Assessment [REBA] and Ovako Work Analysis System [OWAS] methods were applied to analyze the operational stance. Finally, discomfort levels of the specific operational stance were calculated by the use of risk level and BPD scale. From the study it was revealed that most of the construction labourers habitually in awkward operational stance and were affected by altering musculoskeletal manifestations like pain in low back, neck, and wrist. It has been also found that there is a significant (p< 0.05) association between the intensity of pain feeling, age, year of working experience and risk level of the individual working postures of the labourers. Appropriate work-rest schedule, amendments of some working techniques and use of some ergonomically designed equipment may lessen the WRMSDs and improve the health eminence of construction labourers in unorganized sectors.

  3. Design and implementation of an identification system in construction site safety for proactive accident prevention.

    PubMed

    Yang, Huanjia; Chew, David A S; Wu, Weiwei; Zhou, Zhipeng; Li, Qiming

    2012-09-01

    Identifying accident precursors using real-time identity information has great potential to improve safety performance in construction industry, which is still suffering from day to day records of accident fatality and injury. Based on the requirements analysis for identifying precursor and the discussion of enabling technology solutions for acquiring and sharing real-time automatic identification information on construction site, this paper proposes an identification system design for proactive accident prevention to improve construction site safety. Firstly, a case study is conducted to analyze the automatic identification requirements for identifying accident precursors in construction site. Results show that it mainly consists of three aspects, namely access control, training and inspection information and operation authority. The system is then designed to fulfill these requirements based on ZigBee enabled wireless sensor network (WSN), radio frequency identification (RFID) technology and an integrated ZigBee RFID sensor network structure. At the same time, an information database is also designed and implemented, which includes 15 tables, 54 queries and several reports and forms. In the end, a demonstration system based on the proposed system design is developed as a proof of concept prototype. The contributions of this study include the requirement analysis and technical design of a real-time identity information tracking solution for proactive accident prevention on construction sites. The technical solution proposed in this paper has a significant importance in improving safety performance on construction sites. Moreover, this study can serve as a reference design for future system integrations where more functions, such as environment monitoring and location tracking, can be added. Copyright © 2011 Elsevier Ltd. All rights reserved.

  4. Environmental analysis of the operation of Oak Ridge National Laboratory (X-10 site)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boyle, J.W.; Blumberg, R.; Cotter, S.J.

    1982-11-01

    An environmental analysis of the operation of the Oak Ridge National Laboratory (ORNL) facilities in Bethel Valley and Melton Valley was conducted to present to the public information concerning the extent to which recognizable effects, or potential effects, on the environment may occur. The analysis addresses current operations of the ORNL X-10 site and completed operations that may continue to have residual effects. Solid wastes from ORNL operations at the Y-12 site which are transported to the X-10 site for burial (e.g., Biology Division animal wastes) are included as part of X-10 site operation. Socioeconomic effects are associated primarily withmore » the communities where employees live and with the Knoxville Bureau of Economic Analysis economic area as a whole. Therefore, ORNL employees at both Y-12 and X-10 sites are included in the ORNL socioeconomic impact analysis. An extensive base of environmental data was accumulated for this report. Over 80 reports related to ORNL facilities and/or operations are cited as well as many open-literature citations. Environmental effects of the operation of ORNL result from operational discharges from the onsite facilities; construction and/or modification of facilities, transportation to and from the site of persons, goods and services; socioeconomic impacts to the local, regional, and general population; and accidental discharges if they should occur. Operational discharges to the environnment are constrained by federal, state, and local regulations and by criteria established by the US Department of Energy to minimize adverse impacts. It is the purpose of this document to evaluate the operation of the ORNL insofar as impacts beyond the site boundary may occur or have the potential for occurrence.« less

  5. Humboldt Open Ocean Disposal Site (HOODS) Survey Work 2014

    EPA Pesticide Factsheets

    The Humboldt Open Ocean Disposal Site (HOODS) is a dredged material disposal site located 3 nautical miles (nm) offshore of Humboldt Bay in Northern California. HOODS was permanently designated by EPA Region 9 in 1995, and has been actively used for dredged material disposal operations since then. The HOODS has received higher volumes of dredged material than predicted since its designation in 1995, mainly from USACE construction and maintenance dredging.

  6. Recommendations For The Safe Design, Operation And Use Of Commercial Sun Tanning Equipment

    NASA Astrophysics Data System (ADS)

    Cox, E. A.

    1982-02-01

    HSE Guidance Notes are being prepared to give recommendations to the designers, manufacturers, operators and users of commercial sun tanning equipment on the various health and safety aspects associated with the safe construction, siting and use of such equipment. Medically prescribed ultraviolet treatments are excluded from the guidance.

  7. 77 FR 52060 - Notice of Lodging of Consent Decree Pursuant to the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... through best management practices, (c) capacity, management, operation and maintenance corrective action, (d) construction site inspection and enforcement, and (e) industrial facility stormwater pollution...

  8. Effects of a wind farm installation on the understory bat community of a highly biodiverse tropical region in Mexico.

    PubMed

    Briones-Salas, Miguel; Lavariega, Mario C; Moreno, Claudia E

    2017-01-01

    Wind energy has rapidly become an important alternative among renewable energies, and it is generally considered clean. However, little is known about its impact at the level of ecological communities, especially in biodiversity hotspots. The Isthmus of Tehuantepec is a highly biodiverse region in Mesoamerica, and has the highest potential for generating wind energy in Mexico. To assess the effects of installing a wind farm on the understory bat community in a landscape of fragmented habitat, we assessed its diversity and composition over four stages of installation (site preparation, construction, and two stages of operation). We captured 919 bats belonging to 22 species. Species richness, functional diversity and phylogenetic diversity decreased during construction and the first stage of operation. However, these components of biodiversity increased during the second stage of operation, and species composition began to resemble that of the site preparation stage. No species considered as sensitive to disturbance was recorded at any stage. This is the first study to reveal the diversity of a Neotropical bat community after wind turbines begin to operate.

  9. Effects of a wind farm installation on the understory bat community of a highly biodiverse tropical region in Mexico

    PubMed Central

    Lavariega, Mario C.; Moreno, Claudia E.

    2017-01-01

    Wind energy has rapidly become an important alternative among renewable energies, and it is generally considered clean. However, little is known about its impact at the level of ecological communities, especially in biodiversity hotspots. The Isthmus of Tehuantepec is a highly biodiverse region in Mesoamerica, and has the highest potential for generating wind energy in Mexico. To assess the effects of installing a wind farm on the understory bat community in a landscape of fragmented habitat, we assessed its diversity and composition over four stages of installation (site preparation, construction, and two stages of operation). We captured 919 bats belonging to 22 species. Species richness, functional diversity and phylogenetic diversity decreased during construction and the first stage of operation. However, these components of biodiversity increased during the second stage of operation, and species composition began to resemble that of the site preparation stage. No species considered as sensitive to disturbance was recorded at any stage. This is the first study to reveal the diversity of a Neotropical bat community after wind turbines begin to operate. PMID:28630802

  10. Quantum Markov semigroups constructed from quantum Bernoulli noises

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Caishi; Chen, Jinshu

    2016-02-15

    Quantum Bernoulli noises (QBNs) are the family of annihilation and creation operators acting on Bernoulli functionals, which can describe a two-level quantum system with infinitely many sites. In this paper, we consider the problem to construct quantum Markov semigroups (QMSs) directly from QBNs. We first establish several new theorems concerning QBNs. In particular, we define the number operator acting on Bernoulli functionals by using the canonical orthonormal basis, prove its self-adjoint property, and describe precisely its connections with QBN in a mathematically rigorous way. We then show the possibility to construct QMS directly from QBN. This is done by combiningmore » the general results on QMS with our new results on QBN obtained here. Finally, we examine some properties of QMS constructed from QBN.« less

  11. Two-tier Haddon matrix approach to fault analysis of accidents and cybernetic search for relationship to effect operational control: a case study at a large construction site.

    PubMed

    Mazumdar, Atmadeep; Sen, Krishna Nirmalya; Lahiri, Balendra Nath

    2007-01-01

    The Haddon matrix is a potential tool for recognizing hazards in any operating engineering system. This paper presents a case study of operational hazards at a large construction site. The fish bone structure helps to visualize and relate the chain of events, which led to the failure of the system. The two-tier Haddon matrix approach helps to analyze the problem and subsequently prescribes preventive steps. The cybernetic approach has been undertaken to establish the relationship among event variables and to identify the ones with most potential. Those event variables in this case study, based on the cybernetic concepts like control responsiveness and controllability salience, are (a) uncontrolled swing of sheet contributing to energy, (b) slippage of sheet from anchor, (c) restricted longitudinal and transverse swing or rotation about the suspension, (d) guilt or uncertainty of the crane driver, (e) safe working practices and environment.

  12. Delivery of Fuel and Construction Materials to South Pole Station

    DTIC Science & Technology

    1993-07-01

    AID-A270 431 Delivery of Fuel and Construction Materials to South Pole Station Stephen L. DenHartog and George L. Blaisdell July 993 DTIC ELECT S OCT...South Pole Station, ideally with minimal impact on the current science and operational program. The new station will require the delivery of massive...amounts of construction materials to this remote site. The existing means of delivering material and fuel to the South Pole include the use of specialized

  13. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eugene S. Grecheck

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision onmore » building a new nuclear power plant at the North Anna site.« less

  14. Groundwater contamination from waste management sites: The interaction between risk-based engineering design and regulatory policy: 2. Results

    NASA Astrophysics Data System (ADS)

    Massmann, Joel; Freeze, R. Allan

    1987-02-01

    The risk-cost-benefit analysis developed in the companion paper (J. Massmann and R. A. Freeze, this issue) is here applied to (1) an assessment of the relative worth of containment-construction activities, site-exploration activities, and monitoring activities as components of a design strategy for the owner/operator of a waste management facility; (2) an assessment of alternative policy options available to a regulatory agency; and (3) a case history. Sensitivity analyses designed to address the first issue show that the allocation of resources by the owner/operator is sensitive to the stochastic parameters used to describe the hydraulic conductivity field at a site. For the cases analyzed, the installation of a dense monitoring network is of less value to the owner/operator than a more conservative containment design. Sensitivity analyses designed to address the second issue suggest that from a regulatory perspective, design standards should be more effective than performance standards in reducing risk, and design specifications on the containment structure should be more effective than those on the monitoring network. Performance bonds posted before construction have a greater potential to influence design than prospective penalties to be imposed at the time of failure. Siting on low-conductivity deposits is a more effective method of risk reduction than any form of regulatory influence. Results of the case history indicate that the methodology can be successfully applied at field sites.

  15. (US low-level radioactive waste management facility design, construction, and operation): Foreign trip report, July 22--30, 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Bolinsky, J.

    1989-08-02

    The Martin Marietta Energy Systems, Inc., Team, consisting of representatives of the Engineering Division and Oak Ridge National Laboratory (ORNL), participated in a technology exchange program on French and US low-level radioactive waste (LLW) management facility design, construction, and operation. Meetings were held at the Agence National pour la Gestion des Dechets Radioactif (ANDRA) offices in Paris to review the designs for the new French LLW disposal facility, the Cente de Stockage de l'Aube (CSA), and the new ORNL LLW disposal project, the Interim Waste Management Facility (IWMF), and the results of the French LLW disposal facility cover experiment atmore » St. Sauveur. Visits were made to the operating LLW disposal facility, the Centre de Stockage de la Manche (CSM), the LLW conditioning facilities at the La Hague Reprocessing Facility, and the St. Saueveur Disposal Cap Experiment to discuss design, construction, and operating experience. A visit was also made to the CSA site to view the progress made in construction of the new facility.« less

  16. National Program for Inspection of Non-Federal Dams. Baker Floodwater Reservoir Site 11 (NH 00478), NHWRB No. 249.13, Merrimack River Basin, Wentworth, New Hampshire. Phase I Inspection Report.

    DTIC Science & Technology

    1979-07-01

    General 5-1 b. Design Data 5-1 c. Experience Data 5-1 d. Visual Observation 5-1 e. Overtopping Potential 5-1 f. Dam Failure Analysis 5-2 6. STRUCTURAL...the Soil Conservation Service, Durham, New Hampshire. The construction * contractor was Robie Construction Company , Inc. i. Normal Operating...INVENTORY OF DAMS P 0O - ... - SECTION 5 HYDROLOGY AND HYDRAULIC ANALYSIS • 5.1 Evaluation of Features a. General. Baker Dam Site 11 is an earthen

  17. European Extremely Large Telescope: progress report

    NASA Astrophysics Data System (ADS)

    Tamai, R.; Spyromilio, J.

    2014-07-01

    The European Extremely Large Telescope is a project of the European Southern Observatory to build and operate a 40-m class optical near-infrared telescope. The telescope design effort is largely concluded and construction contracts are being placed with industry and academic/research institutes for the various components. The siting of the telescope in Northern Chile close to the Paranal site allows for an integrated operation of the facility providing significant economies. The progress of the project in various areas is presented in this paper and references to other papers at this SPIE meeting are made.

  18. Sitewide Environmental Assessment for the National Renewable Energy Laboratory, Golden, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-04

    The Solar Energy Research, Development, and Demonstration Act of 1974 authorized a federal program to develop solar energy as a viable source of the nation`s future energy needs. Under this authority, the National Renewable Energy Laboratory (NREL) was created as a laboratory of the Department of Energy (DOE) to research a number of renewable energy possibilities. The laboratory conducts its operations both in government-owned facilities on the NREL South Table Mountain (STM) Site near Golden, Colorado, and in a number of leased facilities, particularly the Denver West Office Park. NREL operations include research in energy technologies, and other areas ofmore » national environmental and energy technology interest. Examples of these technologies include electricity from sunlight with solar cells (photovoltaics); energy from wind (windmills or wind turbines); conversion of plants and plant products (biomass) into liquid fuels (ethanol and methanol); heat from the sun (solar thermal) in place of wood, oil, gas, coal and other forms of heating; and solar buildings. NREL proposes to continue and expand the present R&D efforts in C&R energy by making infrastructure improvements and constructing facilities to eventually consolidate the R&D and associated support activities at its STM Site. In addition, it is proposed that operations continue in current leased space at the present levels of activity until site development is complete. The construction schedule proposed is designed to develop the site as rapidly as possible, dependent on Congressional funding, to accommodate not only the existing R&D that is being conducted in leased facilities off-site but to also allow for the 20-year projected growth. Impacts from operations currently conducted off-site are quantified and added to the cumulative impacts of the STM site. This environmental assessment provides information to determine the severity of impacts on the environment from the proposed action.« less

  19. Impact of nighttime paving operations on asphalt roughness behavior.

    DOT National Transportation Integrated Search

    2013-05-01

    The relationship between nighttime construction scheduling and future road quality in terms of roughness was investigated. Research was three-phased: interviews with local leaders in paving, on-site observations, and historical data analyses. Intervi...

  20. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  1. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  2. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  3. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  4. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  5. 77 FR 12087 - Atomic Safety and Licensing Board Panel; Strata Energy, Inc.; Memorandum and Order (Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... part 40.\\*\\ If issued, that license would authorize SEI to construct and operate an in situ recovery (ISR) uranium project at the Ross site in Crook County, Wyoming. In response to an October 27, 2011... Commission in its decision in Sequoyah Fuels Corp. (Gore, Oklahoma Site), CLI-03-15, 58 NRC 349 (2003...

  6. Optimizing and controlling earthmoving operations using spatial technologies

    NASA Astrophysics Data System (ADS)

    Alshibani, Adel

    This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object-Oriented Programming, Microsoft Foundation Classes (MFC), and has been coded using visual C++ V.6. Microsoft Access is employed as database management system. The developed software operates in Microsoft windows' environment. Three example applications were analyzed to validate the development made and to illustrate the essential features of the developed model.

  7. Biological assessment of the effects of construction and operation of adepleted uranium hexafluoride conversion facility at the Portsmouth, Ohio,site.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Lonkhuyzen, R.

    The U.S. Department of Energy (DOE) Depleted Uranium Hexafluoride (DUF{sub 6}) Management Program evaluated alternatives for managing its inventory of DUF{sub 6} and issued the ''Programmatic Environmental Impact Statement for Alternative Strategies for the Long-Term Management and Use of Depleted Uranium Hexafluoride'' (DUF{sub 6} PEIS) in April 1999 (DOE 1999). The DUF{sub 6} inventory is stored in cylinders at three DOE sites: Paducah, Kentucky; Portsmouth, Ohio; and East Tennessee Technology Park (ETTP), near Oak Ridge, Tennessee. In the Record of Decision for the DUF{sub 6} PEIS, DOE stated its decision to promptly convert the DUF{sub 6} inventory to a moremore » stable chemical form. Subsequently, the U.S. Congress passed, and the President signed, the ''2002 Supplemental Appropriations Act for Further Recovery from and Response to Terrorist Attacks on the United States'' (Public Law No. 107-206). This law stipulated in part that, within 30 days of enactment, DOE must award a contract for the design, construction, and operation of a DUF{sub 6} conversion plant at the Department's Paducah, Kentucky, and Portsmouth, Ohio, sites, and for the shipment of DUF{sub 6} cylinders stored at ETTP to the Portsmouth site for conversion. This biological assessment (BA) has been prepared by DOE, pursuant to the National Environmental Policy Act of 1969 and the Endangered Species Act of 1974, to evaluate potential impacts to federally listed species from the construction and operation of a conversion facility at the DOE Portsmouth site. The Indiana bat is known to occur in the area of the Portsmouth site and may potentially occur on the site during spring or summer. Evaluations of the Portsmouth site indicated that most of the site was found to have poor summer habitat for the Indiana bat because of the small size, isolation, and insufficient maturity of the few woodlands on the site. Potential summer habitat for the Indiana bat was identified outside the developed area bounded by Perimeter Road, within the corridors along Little Beaver Creek, the Northwest Tributary stream, and a wooded area east of the X-100 facility. However, no Indiana bats were collected during surveys of these areas in 1994 and 1996. Locations A, B, and C do not support suitable habitat for the Indiana bat and would be unlikely to be used by Indiana bats. Indiana bat habitat also does not occur at Proposed Areas 1 and 2. Although Locations A and C contain small wooded areas, the small size and lack of suitable maturity of these areas indicate that they would provide poor habitat for Indiana bats. Trees that may be removed during construction would not be expected to be used for summer roosting by Indiana bats. Disturbance of Indiana bats potentially roosting or foraging in the vicinity of the facility during operations would be very unlikely, and any disturbance would be expected to be negligible. On the basis of these considerations, DOE concludes that the proposed action is not likely to adversely affect the Indiana bat. No critical habitat exists for this species in the action area. Although the timber rattlesnake occurs in the vicinity of the Portsmouth site, it has not been observed on the site. In addition, habitat for the timber rattlesnake is not present on the Portsmouth site. Therefore, DOE concludes that the proposed action would not affect the timber rattlesnake.« less

  8. An assessment of the performance of municipal constructed wetlands in Ireland.

    PubMed

    Hickey, Anthony; Arnscheidt, Joerg; Joyce, Eadaoin; O'Toole, James; Galvin, Gerry; O' Callaghan, Mark; Conroy, Ken; Killian, Darran; Shryane, Tommy; Hughes, Francis; Walsh, Katherine; Kavanagh, Emily

    2018-03-15

    While performance assessments of constructed wetlands sites around the world have appraised their capacity for effective removal of organics, a large variance remains in these sites' reported ability to retain nutrients, which appears to depend on differences in design, operation and climate factors. Nutrient retention is a very important objective for constructed wetlands, to avoid eutrophication of aquatic environments receiving their effluents. This study assessed the performance of constructed wetlands in terms of nutrient retention and associated parameters under the humid conditions of Ireland's temperate maritime climate. A review of the performance of 52 constructed wetland sites from 17 local authorities aimed to identify the best performing types of constructed wetlands and the treatment factors determining successful compliance with environmental standards. Data analysis compared effluent results from constructed wetlands with secondary free surface flow or tertiary horizontal subsurface flow, hybrid systems and integrated constructed wetlands with those from small-scale mechanical wastewater treatment plants of the same size class. Nutrient concentrations in effluents of constructed wetlands were negatively correlated (p < .01) with specific area, i.e. the ratio of surface area and population equivalents. The latest generation of integrated constructed wetlands, which had applied design guidelines issued by the Department of the Environment, performed best. Storm management design features improved treatment performance of constructed wetlands significantly (p < .05) for total suspended solids concentrations and exceedance frequency of limit values for total nitrogen. Mechanical wastewater treatment plants, secondary free surface water and tertiary horizontal subsurface flow wetlands showed a very large variance in effluent concentrations for organic and nutrient parameters. E. coli numbers in effluents were lowest for integrated constructed wetlands with an arithmetic mean of 89 MPN/100 ml. Despite Ireland's humid climate, some constructed wetland sites achieved long or frequent periods of zero effluent discharge and thus did not transfer any waterborne pollution to their receptors during these periods. Copyright © 2018 Elsevier Ltd. All rights reserved.

  9. KSC-2012-6411

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, concrete has been poured at the site of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, Ka-BOOM system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  10. 49 CFR 228.103 - Approval procedure: construction within one-half mile (2,640 feet) (804 meters).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HOURS OF SERVICE OF... operations are conducted; (4) A blueprint or other drawing showing the relationship of the site to trackage...

  11. Controlling erosion along highways with vegetation or other protective cover.

    DOT National Transportation Integrated Search

    1976-01-01

    Construction operations in highway corridors disturb the natural vegetation and land contours causing potential erosion sites if left denuded. Minimizing erosion on these areas is based on the principles of maximizing water infiltration and reducing ...

  12. US Green Building Council's Leadership in Energy and Environmental Design (LEED®)

    EPA Pesticide Factsheets

    A series of rating systems aimed at increasing the environmental and health performance of buildings' sites and structures and of neighborhoods. LEED® covers the design, construction, and operations of all types of buildings.

  13. Motion Predicts Clinical Callus Formation

    PubMed Central

    Elkins, Jacob; Marsh, J. Lawrence; Lujan, Trevor; Peindl, Richard; Kellam, James; Anderson, Donald D.; Lack, William

    2016-01-01

    Background: Mechanotransduction is theorized to influence fracture-healing, but optimal fracture-site motion is poorly defined. We hypothesized that three-dimensional (3-D) fracture-site motion as estimated by finite element (FE) analysis would influence callus formation for a clinical series of supracondylar femoral fractures treated with locking-plate fixation. Methods: Construct-specific FE modeling simulated 3-D fracture-site motion for sixty-six supracondylar femoral fractures (OTA/AO classification of 33A or 33C) treated at a single institution. Construct stiffness and directional motion through the fracture were investigated to assess the validity of construct stiffness as a surrogate measure of 3-D motion at the fracture site. Callus formation was assessed radiographically for all patients at six, twelve, and twenty-four weeks postoperatively. Univariate and multivariate linear regression analyses examined the effects of longitudinal motion, shear (transverse motion), open fracture, smoking, and diabetes on callus formation. Construct types were compared to determine whether their 3-D motion profile was associated with callus formation. Results: Shear disproportionately increased relative to longitudinal motion with increasing bridge span, which was not predicted by our assessment of construct stiffness alone. Callus formation was not associated with open fracture, smoking, or diabetes at six, twelve, or twenty-four weeks. However, callus formation was associated with 3-D fracture-site motion at twelve and twenty-four weeks. Longitudinal motion promoted callus formation at twelve and twenty-four weeks (p = 0.017 for both). Shear inhibited callus formation at twelve and twenty-four weeks (p = 0.017 and p = 0.022, respectively). Titanium constructs with a short bridge span demonstrated greater longitudinal motion with less shear than did the other constructs, and this was associated with greater callus formation (p < 0.001). Conclusions: In this study of supracondylar femoral fractures treated with locking-plate fixation, longitudinal motion promoted callus formation, while shear inhibited callus formation. Construct stiffness was found to be a poor surrogate of fracture-site motion. Future implant design and operative fixation strategies should seek to optimize 3-D fracture-site motion rather than rely on surrogate measures such as axial stiffness. PMID:26888675

  14. Unmanned aerial vehicles in construction and worker safety.

    PubMed

    Howard, John; Murashov, Vladimir; Branche, Christine M

    2018-01-01

    Applications of unmanned aerial vehicles (UAVs) for military, recreational, public, and commercial uses have expanded significantly in recent years. In the construction industry, UAVs are used primarily for monitoring of construction workflow and job site logistics, inspecting construction sites to assess structural integrity, and for maintenance assessments. As is the case with other emerging technologies, occupational safety assessments of UAVs lag behind technological advancements. UAVs may create new workplace hazards that need to be evaluated and managed to ensure their safe operation around human workers. At the same time, UAVs can perform dangerous tasks, thereby improving workplace safety. This paper describes the four major uses of UAVs, including their use in construction, the potential risks of their use to workers, approaches for risk mitigation, and the important role that safety and health professionals can play in ensuring safe approaches to the their use in the workplace. Published 2017. This article is a U.S. Government work and is in the public domain in the USA.

  15. Design and Field Test of a Mass Efficient Crane for Lunar Payload Handling and Inspection: The Lunar Surface Manipulation System

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; King, Bruce D.; Jones, Thomas Carno; Dorsey, John T.; Mikulas, Martin M.

    2008-01-01

    Devices for lifting, translating and precisely placing payloads are critical for efficient Earthbased construction operations. Both recent and past studies have demonstrated that devices with similar functionality will be needed to support lunar outpost operations. Lunar payloads include: a) prepackaged hardware and supplies which must be unloaded from landers and then accurately located at their operational site, b) sensor packages used for periodic inspection of landers, habitat surfaces, etc., and c) local materials such as regolith which require grading, excavation and placement. Although several designs have been developed for Earth based applications, these devices lack unique design characteristics necessary for transport to and use on the harsh lunar surface. These design characteristics include: a) composite components, b) compact packaging for launch, c) simple in-field reconfiguration and repair, and d) support for tele-operated or automated operations. Also, in contrast to Earth-based construction, where special purpose devices dominate a construction site, a lunar outpost will require versatile devices which provide operational benefit from initial construction through sustained operations. This paper will detail the design of a unique, high performance, versatile lifting device designed for operations on the lunar surface. The device is called the Lunar Surface Manipulation System to highlight the versatile nature of the device which supports conventional cable suspended crane operations as well as operations usually associated with a manipulator such as precise positioning where the payload is rigidly grappled by a tool attached to the tip of the device. A first generation test-bed to verify design methods and operational procedures is under development at the NASA Langley Research Center and recently completed field tests at Moses Lake Washington. The design relied on non-linear finite element analysis which is shown to correlate favorably with laboratory experiments. A key design objective, reviewed in this paper, is the device s simplicity, resulting from a focus on the minimum set of functions necessary to perform payload offload. Further development of the device has the potential for significant mass savings, with a high performance device incorporating composite elements estimated to have a mass less than 3% of the mass of the maximum lunar payload lifted at the tip. The paper will conclude with future plans for expanding the operational versatility of the device.

  16. 78 FR 77706 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Gemfield Mine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ... gold mine and associated processing and ancillary facilities. The project would be located on public... media, newspapers and the BLM Web site at: http://www.blm.gov/nv/st/en/fo/battle_mountain_field.html... to construct, operate, reclaim, and close an open pit, heap leach, gold mining operation known as the...

  17. Environmental characterization of two potential locations at Hanford for a new production reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, E.C.; Becker, C.D.; Fitzner, R.E.

    This report describes various environmental aspects of two areas on the Hanford Site that are potential locations for a New Production Reactor (NPR). The area known as the Skagit Hanford Site is considered the primary or reference site. The second area, termed the Firehouse Site, is considered the alternate site. The report encompasses an environmental characterization of these two potential NPR locations. Eight subject areas are covered: geography and demography; ecology; meteorology; hydrology; geology; cultural resources assessment; economic and social effects of station construction and operation; and environmental monitoring. 80 refs., 68 figs., 109 tabs.

  18. UTILITY DATA ARCHIVING FOR RISK MANAGEMENT

    EPA Science Inventory

    EPA let a contract for a consultant to collect information about historical changes in operations and maintenance, design and construction, and planning and siting for water and wastewater infrastructure. The goal of this research study is to determine risk management alternativ...

  19. KSC-2012-6407

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers pour concrete at the base of the site of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  20. KSC-2012-6410

    NASA Image and Video Library

    2012-10-29

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers pour and spread concrete at the base of the site of the Antenna Test Bed Array for the Ka-Band Objects Observation and Monitoring, Ka-BOOM system. The construction site is near the former Vertical Processing Facility, which has been demolished. Workers are placing the pile foundations for the 40-foot-diameter dish antenna arrays and their associated utilities, and preparing the site for the operations command center facility. Photo credit: NASA/Ben Smegelski

  1. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical powermore » generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)« less

  2. Technical and design update in the AUBE French low-level radioactive waste disposal facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marque, Y.

    1989-01-01

    Long-term industrial management of radioactive waste in France is carried out by the Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA). ANDRA is in charge of design, siting, construction, and operation of disposal centers. The solution selected in France for the disposal of low- and medium-level, short-lived radioactive waste is near-surface disposal in the earth using the principle of multiple barriers, in accordance with national safety rules and regulations, and based on operating experience from the Centre de Stockage de la Manche. Since the center's start-up in 1969, 400,000 m{sup 3} of waste have been disposed of. The Frenchmore » national program for waste management is proceeding with the construction of a second near-surface disposal, which is expected to be operational in 1991. It is located in the department of AUBE (from which its name derives), 100 miles southeast of Paris. The paper describes the criteria for siting and design of the AUBE disposal facility, design of the AUBE facility disposal module, and comparison with North Carolina and Pennsylvania disposal facility designs.« less

  3. EarthScope's Transportable Array: Advancing Eastward

    NASA Astrophysics Data System (ADS)

    Busby, R. W.; Vernon, F.; Newman, R. L.; Astiz, L.

    2006-12-01

    EarthScope's Transportable Array has installed more than 200 high-quality broadband seismic stations over the last 3 years in the western US. These stations have a nominal spacing of 70 km and are part of an eventual 400 station array that migrates from west to east at a rate of 18 stations per month. The full 400 stations will be operating by September 2007. Stations have a residence time of about 2 years before being relocated to the next site. Throughout the continental US, 1623 sites are expected to be occupied. Standardized procedures and protocols have been developed to streamline all aspects of Transportable Array operations, from siting to site construction and installation to equipment purchasing and data archiving. Earned Value Management tools keep facility installation and operation on budget and schedule. A diverse, yet efficient, infrastructure installs and maintains the Transportable Array. Sensors, dataloggers, and other equipment are received and tested by the IRIS PASSCAL Instrument Center and shipped to regional storage facilities. To engage future geoscientists in the project, students are trained to conduct field and analytical reconnaissance to identify suitable seismic station sites. Contract personnel are used for site verification; vault construction; and installation of sensors, power, and communications systems. IRIS staff manages permitting, landowner communications, and station operations and maintenance. Seismic signal quality and metadata are quality-checked at the Array Network Facility at the University of California-San Diego and simultaneously archived at the IRIS Data Management Center in Seattle. Station equipment has been specifically designed for low power, remote, unattended operation and uses diverse two-way IP communications for real-time transmission. Digital cellular services, VSAT satellite, and commercial DSL, cable or wireless transport services are employed. Automatic monitoring of status, signal quality and earthquake event detection as well as operational alarms for low voltage and water intrusion are performed by a robust data acquisition package. This software is coupled with a host of network management tools and display managers operated by the Array Network Facility to allow managers, field personnel, and network operations staff to visualize array performance in real-time and to access historical information for diagnostics. Current data recording proficiency is 99.1%, with real-time telemetry averaging about 91%. EarthScope, IRIS and the USGS are working with regional seismic network operators, both existing and newly formed, to transition some of the Transportable Array stations into regional network assets. Each region has unique circumstances and interested parties are invited to exchange ideas on how this might be accomplished in their area. Contact busby@iris.edu for more information.

  4. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REPOSITORY Preclosure Guidelines Environment, Socioeconomics, and Transportation § 960.5-2-5 Environmental... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts... of the repository or its support facilities on, a component of the National Park System, the National...

  5. Hazardous Waste Cleanup: Curtiss-Wright in Kearny, New Jersey

    EPA Pesticide Factsheets

    The site is located in Phillipsburg, New Jersey and was operated by Ingersoll Rand Company. Ingersoll Rand began facility construction in 1903 and produced products such as pumps, turbo equipment, air and gas compressors, rock drills, and mining equipment.

  6. Elements of Green.

    ERIC Educational Resources Information Center

    Turckes, Steven; Engelbrecht, Kathie

    2002-01-01

    Discusses incorporating green design into school construction, asserting that schools can improve their impact on the environment and reduce their operating costs while educating people about the value of sustainable design. Addresses energy reduction (including daylighting), site design for low environmental impact, flexible design, indoor air…

  7. Appropriate technology for domestic wastewater management in under-resourced regions of the world

    NASA Astrophysics Data System (ADS)

    Oladoja, Nurudeen Abiola

    2017-11-01

    Centralized wastewater management system is the modern day waste management practice, but the high cost and stringent requirements for the construction and operation have made it less attractive in the under-resourced regions of the world. Considering these challenges, the use of decentralized wastewater management system, on-site treatment system, as an appropriate technology for domestic wastewater treatment is hereby advocated. Adopting this technology helps save money, protects home owners' investment, promotes better watershed management, offers an appropriate solution for low-density communities, provides suitable alternatives for varying site conditions and furnishes effective solutions for ecologically sensitive areas. In the light of this, an overview of the on-site treatment scheme, at the laboratory scale, pilot study stage, and field trials was conducted to highlight the operational principles' strength and shortcomings of the scheme. The operational requirements for the establishing and operation of the scheme and best management practice to enhance the performance and sustenance were proffered.

  8. American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-06-28

    This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

  9. The development and manufacture of wood composite wind turbine rotors

    NASA Technical Reports Server (NTRS)

    Zuteck, M. D.

    1982-01-01

    The physical properties, operational experience, and construction methods of the wood/epoxy composite MOD 0A wind turbine blades are considered. Blades of this type have accumulated over 10,000 hours of successful operation at the Kahuku, Hawaii and Block Island, Rhode Island test sites. That body of experience is summarized and related to the structural concepts and design drivers which motivated the original design and choice of interior layout. Actual manufacturing experience and associated low first unit costs for these blades, as well as projections for high production rates, are presented. Application of these construction techniques to a wide range of other blade sizes is also considered.

  10. Translational control of ribosomal protein S15.

    PubMed

    Portier, C; Philippe, C; Dondon, L; Grunberg-Manago, M; Ebel, J P; Ehresmann, B; Ehresmann, C

    1990-08-27

    The expression of ribosomal protein S15 is shown to be translationally and negatively autocontrolled using a fusion within a reporter gene. Isolation and characterization of several deregulated mutants indicate that the regulatory site (the translational operator site) overlaps the ribosome loading site of the S15 messenger. In this region, three domains, each exhibiting a stem-loop structure, were determined using chemical and enzymatic probes. The most downstream hairpin carries the Shine-Dalgarno sequence and the initiation codon. Genetic and structural data derived from mutants constructed by site-directed mutagenesis show that the operator is a dynamic structure, two domains of which can form a pseudoknot. Binding of S15 to these two domains suggests that the pseudoknot could be stabilized by S15. A model is presented in which two alternative structures would explain the molecular basis of the S15 autocontrol.

  11. Solar power satellite system definition study, phase 2. Part 1: Midterm briefing

    NASA Technical Reports Server (NTRS)

    1979-01-01

    An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.

  12. User costs as one of main advantages of precast concrete application in highway construction

    NASA Astrophysics Data System (ADS)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  13. Leasing of Nuclear Power Plants With Using Floating Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuznetsov, Yu.N.; Gabaraev, B.A.; Reshetov, V.A.

    2002-07-01

    The proposal to organize and realize the international program on leasing of Nuclear Power Plant (NPP) reactor compartments is brought to the notice of potential partners. The proposal is oriented to the construction of new NPPs or to replacement of worked-out reactor units of the NPPs in operation on the sites situated near water area and to the use of afloat technologies for construction, mounting and transportation of reactor units as a Reactor Compartment Block Module (RCBM). According to the offered project the RCBM is fabricated in factory conditions at the largest Russian defense shipbuilding plant - State Unitary Enterprisemore » 'Industrial Association SEVMASHPREDPRIYATIE' (SEVMASH) in the city of Severodvinsk of the Arkhangelsk region. After completion of assembling, testing and preliminary licensing the RCBM is given buoyancy by means of hermetic sealing and using pontoons and barges. The RCBM delivery to the NPP site situated near water area is performed by sea route. The RCBM is brought to the place of its installation with the use of appropriate hydraulic structures (canals, shipping locks), then is lowered on the basement constructed beforehand and incorporated into NPP scheme, of which the components are installed in advance. Floating means can be detached from the RCBM and used repeatedly for other RCBMs. Further procedure of NPP commissioning and its operation is carried out according to traditional method by power company in the framework of RCBM leasing with enlisting the services of firm-manufacturer's specialists either to provide reactor plant operation and concomitant processes or to perform author's supervision of operation. After completion of lifetime and reactor unloading the RCBM is dismantled with using the same afloat technology and taken away from NPP site to sea area entirely, together with its structures (reactor vessel, heat exchangers, pumps, pipelines and other equipment). Then RCBM is transported by shipping route to a firm-manufacturer, for subsequent reprocessing, utilization and storage. Nuclear fuel and radioactive wastes are removed from NPP site also. Use of leasing method removes legal problems connected with the transportation of radioactive materials through state borders as the RCBM remains a property of the state-producer at all stages of its life cycle. (authors)« less

  14. 15 CFR 971.606 - Onshore information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...

  15. 15 CFR 971.606 - Onshore information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...

  16. 10 CFR 611.106 - Environmental requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...

  17. 10 CFR 611.106 - Environmental requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...

  18. 10 CFR 611.106 - Environmental requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...

  19. 10 CFR 611.106 - Environmental requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...

  20. 10 CFR 611.106 - Environmental requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... significant environmental effects expected to occur as a result of the project; (3) Identify the effects of... cumulative effects resulting from existing or reasonably foreseeable projects; (4) Identify measures proposed... on-site manpower requirements and payroll during construction and operation, including the number of...

  1. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...

  2. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...

  3. 10 CFR 960.5-2-5 - Environmental quality.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... repository siting, construction, operation, closure, and decommissioning, and projected environmental impacts..., technical, social, economic, and environmental factors; and (2) the requirements specified in § 960.5-1(a)(2... the activities proposed to take place thereon. (2) Potential significant adverse environmental impacts...

  4. Evaluation of constructed wetland treatment performance for winery wastewater.

    PubMed

    Grismer, Mark E; Carr, Melanie A; Shepherd, Heather L

    2003-01-01

    Rapid expansion of wineries in rural California during the past three decades has created contamination problems related to winery wastewater treatment and disposal; however, little information is available about performance of on-site treatment systems. Here, the project objective was to determine full-scale, subsurface-flow constructed wetland retention times and treatment performance through assessment of water quality by daily sampling of total dissolved solids, pH, total suspended solids, chemical oxygen demand (COD), tannins, nitrate, ammonium, total Kjeldahl nitrogen, phosphate, sulfate, and sulfide across operating systems for winery wastewater treatment. Measurements were conducted during both the fall crush season of heavy loading and the spring following bottling and racking operations at the winery. Simple decay model coefficients for these constituents as well as COD and tannin removal efficiencies from winery wastewater in bench-scale reactors are also determined. The bench-scale study used upward-flow, inoculated attached-growth (pea-gravel substrate) reactors fed synthetic winery wastewater. Inlet and outlet tracer studies for determination of actual retention times were essential to analyses of treatment performance from an operational subsurface-flow constructed wetland that had been overloaded due to failure to install a pretreatment system for suspended solids removal. Less intensive sampling conducted at a smaller operational winery wastewater constructed wetland that had used pretreatment suspended solids removal and aeration indicated that the constructed wetlands were capable of complete organic load removal from the winery wastewater.

  5. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    NASA Astrophysics Data System (ADS)

    Hatmoko, Jati Utomo Dwi; Hidayat, Arif; Setiawati, Apsari; Prasetyo, Stefanus Catur Adi

    2018-02-01

    Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG) emissions, to quantify them in terms of carbon dioxide equivalents (CO2e) as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31%) off-site activities and 36.640 tonnes CO2e (51.687%) on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%), and material transportation accounted 24.921 (35.155%). These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  6. Risk-informed regulation and safety management of nuclear power plants--on the prevention of severe accidents.

    PubMed

    Himanen, Risto; Julin, Ari; Jänkälä, Kalle; Holmberg, Jan-Erik; Virolainen, Reino

    2012-11-01

    There are four operating nuclear power plant (NPP) units in Finland. The Teollisuuden Voima (TVO) power company has two 840 MWe BWR units supplied by Asea-Atom at the Olkiluoto site. The Fortum corporation (formerly IVO) has two 500 MWe VVER 440/213 units at the Loviisa site. In addition, a 1600 MWe European Pressurized Water Reactor supplied by AREVA NP (formerly the Framatome ANP--Siemens AG Consortium) is under construction at the Olkiluoto site. Recently, the Finnish Parliament ratified the government Decision in Principle that the utilities' applications to build two new NPP units are in line with the total good of the society. The Finnish utilities, Fenno power company, and TVO company are in progress of qualifying the type of the new nuclear builds. In Finland, risk-informed applications are formally integrated in the regulatory process of NPPs that are already in the early design phase and these are to run through the construction and operation phases all through the entire plant service time. A plant-specific full-scope probabilistic risk assessment (PRA) is required for each NPP. PRAs shall cover internal events, area events (fires, floods), and external events such as harsh weather conditions and seismic events in all operating modes. Special attention is devoted to the use of various risk-informed PRA applications in the licensing of Olkiluoto 3 NPP. © 2012 Society for Risk Analysis.

  7. Event-based total suspended sediment particle size distribution model

    NASA Astrophysics Data System (ADS)

    Thompson, Jennifer; Sattar, Ahmed M. A.; Gharabaghi, Bahram; Warner, Richard C.

    2016-05-01

    One of the most challenging modelling tasks in hydrology is prediction of the total suspended sediment particle size distribution (TSS-PSD) in stormwater runoff generated from exposed soil surfaces at active construction sites and surface mining operations. The main objective of this study is to employ gene expression programming (GEP) and artificial neural networks (ANN) to develop a new model with the ability to more accurately predict the TSS-PSD by taking advantage of both event-specific and site-specific factors in the model. To compile the data for this study, laboratory scale experiments using rainfall simulators were conducted on fourteen different soils to obtain TSS-PSD. This data is supplemented with field data from three construction sites in Ontario over a period of two years to capture the effect of transport and deposition within the site. The combined data sets provide a wide range of key overlooked site-specific and storm event-specific factors. Both parent soil and TSS-PSD in runoff are quantified by fitting each to a lognormal distribution. Compared to existing regression models, the developed model more accurately predicted the TSS-PSD using a more comprehensive list of key model input parameters. Employment of the new model will increase the efficiency of deployment of required best management practices, designed based on TSS-PSD, to minimize potential adverse effects of construction site runoff on aquatic life in the receiving watercourses.

  8. 44 CFR 354.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a commercial nuclear power plant site once every two years in conformance with 44 CFR part 350. EPZ... Protection Agency, Department of Health and Human Services, Department of Interior, Department of Energy...) A license to construct or operate a commercial nuclear power plant; (2) A possession-only license...

  9. ON-SITE PRODUCTION OF ACTIVATED CARBON FROM KRAFT BLACK LIQUOR

    EPA Science Inventory

    A pilot plant was designed and constructed to produce char via the St. Regis hydropyrolysis kraft chemical recovery process and to produce activated carbon from the char. This report includes discussion of laboratory and prepilot work, the pilot plant, and presents operating resu...

  10. Development of Guidelines for Reduction of Temperature Differential Damage (TDD) for Hot Mix Asphalt Pavement Projects in Connecticut

    DOT National Transportation Integrated Search

    1999-11-01

    Connecticut Department of Transportation personnel used an infrared camera to observe thermal segregation of hot mix asphalt during pavement construction. Several sites were selected for study from ongoing paving projects. During paving operations, t...

  11. 76 FR 35474 - Colville Indian Plywood and Veneer, Colville Tribal Enterprise Corporation Wood Products Division...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... and Veneer, Colville Tribal Enterprise Corporation Wood Products Division, Including On-Site Workers..., applicable to workers of Colville Indian Plywood and Veneer, Colville Tribal Enterprise Corporation Wood... Wood Products Division, to perform construction, electrical and operational maintenance support...

  12. 40 CFR 62.14620 - What site-specific documentation is required?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Operator Training and Qualification § 62.14620 What...) Procedures for receiving, handling, and charging waste. (3) Incinerator startup, shutdown, and malfunction...

  13. Advanced Decision-Support for Coastal Beach Health: Virtual Beach 3.0

    EPA Science Inventory

    Virtual Beach is a free decision-support system designed to help beach managers and researchers construct, evaluate, and operate site-specific statistical models that can predict levels of fecal indicator bacteria (FIB) based on environmental conditions that are more readily mea...

  14. Calculation of the Strip Foundation on Solid Elastic Base, Taking into Account the Karst Collapse

    NASA Astrophysics Data System (ADS)

    Sharapov, R.; Lodigina, N.

    2017-07-01

    Karst processes greatly complicate the construction and operation of buildings and structures. Due to the karstic deformations at different times there have been several major accidents, which analysis showed that in all cases the fundamental errors committed at different stages of building development: site selection, engineering survey, design, construction or operation of the facilities. Theory analysis of beams on elastic foundation is essential in building practice. Specialist engineering facilities often have to resort to multiple designing in finding efficient forms of construction of these facilities. In work the calculation of stresses in cross-sections of the strip foundation evenly distributed load in the event of karst. A comparison of extreme stress in the event of karst and without accounting for the strip foundation as a beam on an elastic foundation.

  15. Timetable of an operational flood forecasting system

    NASA Astrophysics Data System (ADS)

    Liechti, Katharina; Jaun, Simon; Zappa, Massimiliano

    2010-05-01

    At present a new underground part of Zurich main station is under construction. For this purpose the runoff capacity of river Sihl, which is passing beneath the main station, is reduced by 40%. If a flood is to occur the construction site is evacuated and gates can be opened for full runoff capacity to prevent bigger damages. However, flooding the construction site, even if it is controlled, is coupled with costs and retardation. The evacuation of the construction site at Zurich main station takes about 2 to 4 hours and opening the gates takes another 1 to 2 hours each. In the upper part of the 336 km2 Sihl catchment the Sihl lake, a reservoir lake, is situated. It belongs and is used by the Swiss Railway Company for hydropower production. This lake can act as a retention basin for about 46% of the Sihl catchment. Lowering the lake level to gain retention capacity, and therewith safety, is coupled with direct loss for the Railway Company. To calculate the needed retention volume and the water to be released facing unfavourable weather conditions, forecasts with a minimum lead time of 2 to 3 days are needed. Since the catchment is rather small, this can only be realised by the use of meteorological forecast data. Thus the management of the construction site depends on accurate forecasts to base their decisions on. Therefore an operational hydrological ensemble prediction system (HEPS) was introduced in September 2008 by the Swiss Federal Institute for Forest, Snow and Landscape Research (WSL). It delivers daily discharge forecasts with a time horizon of 5 days. The meteorological forecasts are provided by MeteoSwiss and stem from the operational limited-area COSMO-LEPS which downscales the ECMWF ensemble prediction system to a spatial resolution of 7 km. Additional meteorological data for model calibration and initialisation (air temperature, precipitation, water vapour pressure, global radiation, wind speed and sunshine duration) and radar data are also provided by MeteoSwiss. Additional meteorological and hydrological observations are provided by a hydropower company, the Canton of Zurich and the Federal Office for the Environment (FOEN). The hydrological forecasting is calculated by the semi-distributed hydrological model PREVAH (Precipitation-Runoff-EVapotranspiration-HRU-related Model) and is further processed by the hydraulic model FLORIS. Finally the forecasts and alerts along with additional meteorological and hydrological observations and forecasts from collaborating institution are sent to a webserver accessible for decision makers. We will document the setup of our operational flood forecasting system, evaluate its performance and show how the collaboration and communication between science and practice, including all the different interests, works for this particular example.

  16. American Bald Eagle Restoration Plan for Dale Hollow Lake.

    DTIC Science & Technology

    1987-06-01

    Wildlife Resources Agency’s (TWRA) Reelfoot Lake site, Tennessee Valley Authority’s (TVA), Land Between the Lakes operation in Kentucky, and the Alabama...three active hacking sites were visited: (1) Reelfoot Lake (Tennessee), (2) Land Between the Lakes (Kentucky), and (3) Mud Creek (Alabama). These...somewhat differently. Some of the differences are hereby noted: (1) Reelfoot Lake -- The towers here are constructed in lIve cypress trees at a height

  17. Develop and test fuel cell powered on-site integrated total energy system

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Test results are given for a 5 kW stack and initial results for an integrated, grid connected system operating from methanol fuel. Site selection criteria are presented for future demonstration of a 50 or 100 kW OS/IES. Preliminary results are also given with approximate internal rates of return to the building owner. Progress in development and construction of a 50 kW modular methanol/steam reformer is reported.

  18. Operations analysis for lunar surface construction: Results of two office of exploration case studies

    NASA Astrophysics Data System (ADS)

    Bell, Lisa Y.; Boles, Walter; Smith, Alvin

    1991-08-01

    In an environment of intense competition for Federal funding, the U.S. space research community is responsible for developing a feasible, cost-effective approach to establishing a surface base on the moon to fulfill long-term Government objectives. This report presents the results of a construction operations analysis of two lunar scenarios provided by the National Aeronautics and Space Administration (NASA). Activities necessary to install the lunar base surface elements are defined and scheduled, based on the productivities and availability of the base resources allocated to the projects depicted in each scenario. The only construction project in which the required project milestones were not completed within the nominal timeframe was the initial startup phase of NASA's FY89 Lunar Evolution Case Study (LECS), primarily because this scenario did not include any Earth-based telerobotic site preparation before the arrival of the first crew. The other scenario analyzed. Reference Mission A from NASA's 90-Day Study of the Human Exploration of the Moon and Mars, did use telerobotic site preparation before the manned phase of the base construction. Details of the analysis for LECS are provided, including spreadsheets indicating quantities of work and Gantt charts depicting the general schedule for the work. This level of detail is not presented for the scenario based on the 90-Day Study because many of the projects include the same (or similar) surface elements and facilities.

  19. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)« less

  20. Design of N-Coordinated Dual-Metal Sites: A Stable and Active Pt-Free Catalyst for Acidic Oxygen Reduction Reaction.

    PubMed

    Wang, Jing; Huang, Zhengqing; Liu, Wei; Chang, Chunran; Tang, Haolin; Li, Zhijun; Chen, Wenxing; Jia, Chunjiang; Yao, Tao; Wei, Shiqiang; Wu, Yuen; Li, Yadong

    2017-12-06

    We develop a host-guest strategy to construct an electrocatalyst with Fe-Co dual sites embedded on N-doped porous carbon and demonstrate its activity for oxygen reduction reaction in acidic electrolyte. Our catalyst exhibits superior oxygen reduction reaction performance, with comparable onset potential (E onset , 1.06 vs 1.03 V) and half-wave potential (E 1/2 , 0.863 vs 0.858 V) than commercial Pt/C. The fuel cell test reveals (Fe,Co)/N-C outperforms most reported Pt-free catalysts in H 2 /O 2 and H 2 /air. In addition, this cathode catalyst with dual metal sites is stable in a long-term operation with 50 000 cycles for electrode measurement and 100 h for H 2 /air single cell operation. Density functional theory calculations reveal the dual sites is favored for activation of O-O, crucial for four-electron oxygen reduction.

  1. The ARCO 1 megawatt Photovoltaic Power Plant

    NASA Astrophysics Data System (ADS)

    Rhodes, G. W.; Reilly, M. R.

    The world's largest Photovoltaic Power Plant is in operation and meeting performance specifications on the Southern California Edison (SCE) grid near Hesperia, California. The 1 MW plant designed and constructed by The BDM Corporation, for ARCO Solar Inc., occupies a 20 acre site adjacent to the SCE Lugo substation. The entire design and construction process took 7 1/2 months and was not only on schedule but below budget. Because of its vast photovoltaic experience, BDM was chosen over several engineering firms to perform this complex job. We were provided a conceptual design from ARCO which we quickly refined and immediately initiated construction.

  2. Construction operations for an early lunar base

    NASA Technical Reports Server (NTRS)

    Graf, John

    1988-01-01

    Six construction tasks identified as activities likely to be performed at an early lunar base are described: initializing the habitation module, preparing a landing site, transferring payload off the lander, smoothing roads, constructing the inflatable structure, and excavating for lunar oxygen production. Requirements for each task are given, and a point design capable of meeting the task requirements is described. EVA needs are listed for each task. The equipment used to perform these tasks is described. It is noted that all the tasks can be performed with three common vehicles (a rover, a truck, and an excavator) and some shared equipment.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Booth, Peter M.; Da Silva, Nivaldo Carlos; Pereira de Oliveira, Alexandre

    The Caldas site is located in the Federal State of Minas Gerais in Brazil about 25 km from the city of Pocos de Caldas. While the city itself has 150,000 inhabitants there is a total population of around 0.5 million people living in an area that could potentially be influenced by the site. Uranium ore was mined and milled here between the years of 1982 and 1995, with ore extraction taking place from an open pit. Of the material removed, aside from that extracted for uranium, some was used on-site for road construction and building embankments while the remainder wasmore » disposed of onto two major rock piles. There are a number of potential historical and current environmental impacts to groundwater as a consequence of discharges into streams which then flow off site. The site is now undergoing a phase of decommissioning which includes the formulation and substantiation of a site remediation strategy. As part of a wider International Atomic Energy Agency (IAEA) Technical Cooperation Project aimed at providing practical guidance for implementing a decommissioning and remediation plan at the site, WSP E and E were invited to lead a mission in order to provide advice on the importance and merits of stakeholder engagement and how to ultimately build an engagement program. In November 2011, WSP E and E met with personnel from the site operators, the Brazilian regulatory bodies and representatives from the local stakeholder community and explained the principles of stakeholder engagement and how the process had internationally evolved principally from a decide-announce-defend approach to a more formal two way mechanism of engagement. Historically there had been insufficient liaison between the site operator, the nuclear regulator and the environmental regulator. All parties had recognized that greater interaction was necessary. There had also been very little engagement with local stakeholders about the various activities on the site and the potential implications of these activities on human health and the environment. The main concerns of the local stakeholders were in relation to potential environmental impacts on groundwater and surface water as well as their lack of knowledge about the site's activities and how it might evolve over time. There was a feeling that the site brought no real benefit to the local community as local labor was rarely utilized when work was being undertaken. WSP E and E were asked many questions about stakeholder engagement processes and had to address a number of concerns relating to being able to construct and control an engagement program. Advice was provided on how to construct a phased program in a manner that would allow the site operator to demonstrate increased transparency and allow as wide a range of stakeholders as possible the opportunity to become engaged. We provided an important message in that engagement often had to be culture and project specific and that what might work in one country could not necessarily purely be transposed to another. Since the WSP E and E mission there has been evidence of a number of positive steps in many of the areas of stakeholder engagement related to the Caldas site. The nuclear and environmental regulators work in a more open and transparent manner and continue to undertake joint inspections of the Caldas site. They have agreed to develop a written agreement that will enable them to jointly assess and discuss the issues on the site. Both regulatory bodies had previously accompanied the site operator on a visit to the Wismut uranium mining area in Germany and as well as providing useful learning had also allowed the regulators to discuss some common issues, thus bringing them closer together. A local stakeholder group under the auspices of the Water Commission had previously been set up but now they are starting to have more regular meetings with the site operator and nuclear regulator. They are now additionally considering the formation of a site specific advisory board (based on similar lines to those at US legacy sites) in order to gain some further technical focus within the stakeholder community. The site operator has started to present and explain the proposed environmental remediation plans to various towns and cities potentially influenced by the Caldas site. The successes to date can be attributed primarily to the willingness of the site operator to engage more openly with local community representatives in addition to the enthusiasm of the Water Commission itself. Providing stakeholder engagement advice to all the relevant parties in a manner which recognized their concerns, aspirations and country specific culture was extremely important for this positive progress to have been established. The process established and the subsequent successes could provide useful learning to those countries that face similar cultural engagement challenges. (authors)« less

  4. Construction, Startup and Operation of a New LLRW Disposal Facility in Andrews County, Texas - 12151

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Vliet, James A.

    2012-07-01

    During this last year, Waste Control Specialists LLC (WCS) completed construction and achieved start of operations of a new low level radioactive waste (LLRW) disposal facility in Andrews County Texas. Disposal operations are underway for commercial LLRW, and start up evolutions are in progress for disposal of Department of Energy (DOE) LLRW. The overall approach to construction and start up are presented as well as some of the more significant challenges and how they were addressed to achieve initial operations of the first new commercial low level radioactive waste disposal facility in more than 30 years. The WCS disposal facilitymore » consists of two LLRW disposal cells, one for Texas Compact waste, and a separate disposal cell for DOE waste. Both disposal cells have very robust and unique designs. The cells themselves are constructed entirely in very low permeability red bed clay. The cell liners include a 0.91 meter thick clay liner meeting unprecedented permeability limits, 0.3 meter thick reinforced concrete barriers, as well as the standard geo-synthetic liners. Actions taken to meet performance criteria and install these liners will be discussed. Consistent with this highly protective landfill design, WCS chose to install a zero discharge site water management system. The considerations behind the design and construction of this system will be presented. Other activities essential to successful start of LLRW disposal operations included process and procedure development and refinement, staffing and staff development, and training. Mock ups were built and used for important evolutions and functions. Consistent with the extensive regulation of LLRW operations, engagement with the Texas Commission on Environmental Quality (TCEQ) was continuous and highly interactive. This included daily activity conference calls, weekly coordination calls and numerous topical conference calls and meetings. TCEQ staff and consultants frequently observed specific construction evolutions, such as geological feature mapping of designated excavation faces, disposal cell clay liner installation, disposal cell concrete barrier construction, etc. (author)« less

  5. Microbial Community Structure and Diversity in an Integrated System of Anaerobic-Aerobic Reactors and a Constructed Wetland for the Treatment of Tannery Wastewater in Modjo, Ethiopia

    PubMed Central

    Desta, Adey Feleke; Assefa, Fassil; Leta, Seyoum; Stomeo, Francesca; Wamalwa, Mark; Njahira, Moses; Appolinaire, Djikeng

    2014-01-01

    A culture-independent approach was used to elucidate the microbial diversity and structure in the anaerobic-aerobic reactors integrated with a constructed wetland for the treatment of tannery wastewater in Modjo town, Ethiopia. The system has been running with removal efficiencies ranging from 94%–96% for COD, 91%–100% for SO42- and S2-, 92%–94% for BOD, 56%–82% for total Nitrogen and 2%–90% for NH3-N. 16S rRNA gene clone libraries were constructed and microbial community assemblies were determined by analysis of a total of 801 unique clone sequences from all the sites. Operational Taxonomic Unit (OTU) - based analysis of the sequences revealed highly diverse communities in each of the reactors and the constructed wetland. A total of 32 phylotypes were identified with the dominant members affiliated to Clostridia (33%), Betaproteobacteria (10%), Bacteroidia (10%), Deltaproteobacteria (9%) and Gammaproteobacteria (6%). Sequences affiliated to the class Clostridia were the most abundant across all sites. The 801 sequences were assigned to 255 OTUs, of which 3 OTUs were shared among the clone libraries from all sites. The shared OTUs comprised 80 sequences belonging to Clostridiales Family XIII Incertae Sedis, Bacteroidetes and unclassified bacterial group. Significantly different communities were harbored by the anaerobic, aerobic and rhizosphere sites of the constructed wetland. Numerous representative genera of the dominant bacterial classes obtained from the different sample sites of the integrated system have been implicated in the removal of various carbon- containing pollutants of natural and synthetic origins. To our knowledge, this is the first report of microbial community structure in tannery wastewater treatment plant from Ethiopia. PMID:25541981

  6. Modeling of fugitive dust emission for construction sand and gravel processing plant.

    PubMed

    Lee, C H; Tang, L W; Chang, C T

    2001-05-15

    Due to rapid economic development in Taiwan, a large quantity of construction sand and gravel is needed to support domestic civil construction projects. However, a construction sand and gravel processing plant is often a major source of air pollution, due to its associated fugitive dust emission. To predict the amount of fugitive dust emitted from this kind of processing plant, a semiempirical model was developed in this study. This model was developed on the basis of the actual dust emission data (i.e., total suspended particulate, TSP) and four on-site operating parameters (i.e., wind speed (u), soil moisture (M), soil silt content (s), and number (N) of trucks) measured at a construction sand and gravel processing plant. On the basis of the on-site measured data and an SAS nonlinear regression program, the expression of this model is E = 0.011.u2.653.M-1.875.s0.060.N0.896, where E is the amount (kg/ton) of dust emitted during the production of each ton of gravel and sand. This model can serve as a facile tool for predicting the fugitive dust emission from a construction sand and gravel processing plant.

  7. Feasibility of remotely manipulated welding in space. A step in the development of novel joining technologies

    NASA Technical Reports Server (NTRS)

    Masubuchi, K.; Agapakis, J. E.; Debiccari, A.; Vonalt, C.

    1983-01-01

    In order to establish permanent human presence in space technologies of constructing and repairing space stations and other space structures must be developed. Most construction jobs are performed on earth and the fabricated modules will then be delivered to space by the Space Shuttle. Only limited final assembly jobs, which are primarily mechanical fastening, will be performed on site in space. Such fabrication plans, however, limit the designs of these structures, because each module must fit inside the transport vehicle and must withstand launching stresses which are considerably high. Large-scale utilization of space necessitates more extensive construction work on site. Furthermore, continuous operations of space stations and other structures require maintenance and repairs of structural components as well as of tools and equipment on these space structures. Metal joining technologies, and especially high-quality welding, in space need developing.

  8. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA)more » of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021).« less

  9. Construction Status and Early Science with the Daniel K. Inouye Solar Telescope

    NASA Astrophysics Data System (ADS)

    McMullin, Joseph P.; Rimmele, Thomas R.; Warner, Mark; Martinez Pillet, Valentin; Craig, Simon; Woeger, Friedrich; Tritschler, Alexandra; Berukoff, Steven J.; Casini, Roberto; Goode, Philip R.; Knoelker, Michael; Kuhn, Jeffrey Richard; Lin, Haosheng; Mathioudakis, Mihalis; Reardon, Kevin P.; Rosner, Robert; Schmidt, Wolfgang

    2016-05-01

    The 4-m Daniel K. Inouye Solar Telescope (DKIST) is in its seventh year of overall development and its fourth year of site construction on the summit of Haleakala, Maui. The Site Facilities (Utility Building and Support & Operations Building) are in place with ongoing construction of the Telescope Mount Assembly within. Off-site the fabrication of the component systems is completing with early integration testing and verification starting.Once complete this facility will provide the highest sensitivity and resolution for study of solar magnetism and the drivers of key processes impacting Earth (solar wind, flares, coronal mass ejections, and variability in solar output). The DKIST will be equipped initially with a battery of first light instruments which cover a spectral range from the UV (380 nm) to the near IR (5000 nm), and capable of providing both imaging and spectro-polarimetric measurements throughout the solar atmosphere (photosphere, chromosphere, and corona); these instruments are being developed by the National Solar Observatory (Visible Broadband Imager), High Altitude Observatory (Visible Spectro-Polarimeter), Kiepenheuer Institute (Visible Tunable Filter) and the University of Hawaii (Cryogenic Near-Infrared Spectro-Polarimeter and the Diffraction-Limited Near-Infrared Spectro-Polarimeter). Further, a United Kingdom consortium led by Queen's University Belfast is driving the development of high speed cameras essential for capturing the highly dynamic processes measured by these instruments. Finally, a state-of-the-art adaptive optics system will support diffraction limited imaging capable of resolving features approximately 20 km in scale on the Sun.We present the overall status of the construction phase along with the current challenges as well as a review of the planned science testing and the transition into early science operations.

  10. New construction of eigenstates and separation of variables for SU( N) quantum spin chains

    NASA Astrophysics Data System (ADS)

    Gromov, Nikolay; Levkovich-Maslyuk, Fedor; Sizov, Grigory

    2017-09-01

    We conjecture a new way to construct eigenstates of integrable XXX quantum spin chains with SU( N) symmetry. The states are built by repeatedly acting on the vacuum with a single operator B good( u) evaluated at the Bethe roots. Our proposal serves as a compact alternative to the usual nested algebraic Bethe ansatz. Furthermore, the roots of this operator give the separated variables of the model, explicitly generalizing Sklyanin's approach to the SU( N) case. We present many tests of the conjecture and prove it in several special cases. We focus on rational spin chains with fundamental representation at each site, but expect many of the results to be valid more generally.

  11. A New Blondin System for Surveying and Photogrammetry

    PubMed Central

    Cuesta, Federico; Lopez-Rodriguez, Francisco M.; Esteban, Antonio

    2013-01-01

    The main objective of the system presented in this paper is to provide surveyors and engineers with a new photogrammetry device that can be easily integrated with surveying total stations and a global navigation satellite system (GNSS) infrastructure at a construction site, taking advantage of their accuracy and overcoming limitations of aerial vehicles with respect to weight, autonomy and skilled operator requirements in aerial photogrammetry. The system moves between two mounting points, in a blondin ropeway configuration, at the construction site, taking pictures and recording the data of the position and the orientation along the cable path. A cascaded extended Kalman filter is used to integrate measurements from the on-board inertial measurement unit (IMU), a GPS and a GNSS. Experimental results taken in a construction site show the system performance, including the validation of the position estimation, with a robotic surveying total station, or the creation of a digital surface model (DSM), using the emergent structure from motion (SfM) techniques and open software. The georeferencing of the DSM is performed based on estimated camera position or using ground control points (GCPs).

  12. Superfund Record of Decision (EPA Region 1): Baird and McGuire, MA. (Third remedial action), September 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-09-14

    The Baird and McGuire site is a former chemical manufacturing facility in northwest Holbrook, Massachusetts, approximately 14 miles south of Boston. From 1912 to 1983 the company operated a chemical manufacturing and batching facility on the property. Manufactured products included herbicides, pesticides, disinfectants, soaps, floor waxes and solvents. Waste disposal methods at the site included direct discharge into the soil, nearby brook and wetlands, and a former gravel pit (now covered) in the eastern portion of the site. EPA conducted a removal action at the site in 1983 after a waste lagoon overflowed spreading contaminants into the Cochato River. Themore » company ceased operating shortly thereafter. A second removal action was conducted in 1985, following the discovery of dioxin in site soils. EPA also conducted an Initial Remedial Measure at the site from 1985 through 1987 which involved constructing a new water main to direct water away from the site, removing building structures, and installing a temporary cap. The primary contaminants of concern affecting the sediment are organics including PAHs and pesticides, and metals including arsenic.« less

  13. 75 FR 3221 - Ruby Pipeline, L.L.C.; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... effects of the construction and operation of the following project facilities: About 675.2 miles of 42... any of the following methods: Web site: http://www.blm.gov/nv/st/en/info/nepa/ruby_pipeline_project...

  14. 38 CFR 39.60 - General requirements for site selection and construction of veterans cemeteries.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Veterans' Relief DEPARTMENT OF VETERANS AFFAIRS (CONTINUED) AID TO STATES FOR ESTABLISHMENT, EXPANSION, AND IMPROVEMENT, OR OPERATION AND MAINTENANCE, OF VETERANS CEMETERIES Establishment, Expansion, and Improvement... criteria and shall apply to all Establishment, Expansion, and Improvement Projects for which Federal...

  15. 10 CFR 52.167 - Issuance of manufacturing license.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... proposed reactor(s) can be incorporated into a nuclear power plant and operated at sites having... design and manufacture the proposed nuclear power reactor(s); (5) The proposed inspections, tests... the construction of a nuclear power facility using the manufactured reactor(s). (2) A holder of a...

  16. The status of LILW disposal facility construction in Korea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Min-Seok; Chung, Myung-Sub; Park, Kyu-Wan

    2013-07-01

    In this paper, we discuss the experiences during the construction of the first LILW disposal facility in South Korea. In December 2005, the South Korean Government designated Gyeongju-city as a host city of Low- and Intermediate-Level Radioactive Waste(LILW) disposal site through local referendums held in regions whose local governments had applied to host disposal facility in accordance with the site selection procedures. The LILW disposal facility is being constructed in Bongilri, Yangbuk-myeon, Gyeongju. The official name of the disposal facility is called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (LILW Disposal Center)'. It can dispose of 800,000 drumsmore » of radioactive wastes in a site of 2,100,000 square meters. At the first stage, LILW repository of underground silo type with disposal capacity of 100,000 drums is under construction expected to be completed by June of 2014. The Wolsong Low and Intermediate Level Radioactive Waste Disposal Center consists of surface facilities and underground facilities. The surface facilities include a reception and inspection facility, an interim storage facility, a radioactive waste treatment building, and supporting facilities such as main control center, equipment and maintenance shop. The underground facilities consist of a construction tunnel for transport of construction equipment and materials, an operation tunnel for transport of radioactive waste, an entrance shaft for workers, and six silos for final disposal of radioactive waste. As of Dec. 2012, the overall project progress rate is 93.8%. (authors)« less

  17. Seismic design parameters - A user guide

    USGS Publications Warehouse

    Leyendecker, E.V.; Frankel, A.D.; Rukstales, K.S.

    2001-01-01

    The 1997 NEHRP Recommended Provisions for Seismic Regulations for New Buildings (1997 NEHRP Provisions) introduced seismic design procedure that is based on the explicit use of spectral response acceleration rather than the traditional peak ground acceleration and/or peak ground velocity or zone factors. The spectral response accelerations are obtained from spectral response acceleration maps accompanying the report. Maps are available for the United States and a number of U.S. territories. Since 1997 additional codes and standards have also adopted seismic design approaches based on the same procedure used in the NEHRP Provisions and the accompanying maps. The design documents using the 1997 NEHRP Provisions procedure may be divided into three categories -(1) Design of New Construction, (2) Design and Evaluation of Existing Construction, and (3) Design of Residential Construction. A CD-ROM has been prepared for use in conjunction with the design documents in each of these three categories. The spectral accelerations obtained using the software on the CD are the same as those that would be obtained by using the maps accompanying the design documents. The software has been prepared to operate on a personal computer using a Windows (Microsoft Corporation) operating environment and a point and click type of interface. The user can obtain the spectral acceleration values that would be obtained by use of the maps accompanying the design documents, include site factors appropriate for the Site Class provided by the user, calculate a response spectrum that includes the site factor, and plot a response spectrum. Sites may be located by providing the latitude-longitude or zip code for all areas covered by the maps. All of the maps used in the various documents are also included on the CDROM

  18. Remotely controlled sensor apparatus for use in dig-face characterization system

    DOEpatents

    Josten, N.E.; Svoboda, J.M.

    1999-05-25

    A remotely controlled sensor platform apparatus useful in a dig-face characterization system is deployed from a mobile delivery device such as standard heavy construction equipment. The sensor apparatus is designed to stabilize sensors against extraneous motions induced by heavy equipment manipulations or other outside influences, and includes a terrain sensing and sensor elevation control system to maintain the sensors in close ground proximity. The deployed sensor apparatus is particularly useful in collecting data in work environments where human access is difficult due to the presence of hazardous conditions, rough terrain, or other circumstances that prevent efficient data collection by conventional methods. Such work environments include hazardous waste sites, unexploded ordnance sites, or construction sites. Data collection in these environments by utilizing the deployed sensor apparatus is desirable in order to protect human health and safety, or to assist in planning daily operations to increase efficiency. 13 figs.

  19. Remotely controlled sensor apparatus for use in dig-face characterization system

    DOEpatents

    Josten, Nicholas E.; Svoboda, John M.

    1999-01-01

    A remotely controlled sensor platform apparatus useful in a dig-face characterization system is deployed from a mobile delivery device such as standard heavy construction equipment. The sensor apparatus is designed to stabilize sensors against extraneous motions induced by heavy equipment manipulations or other outside influences, and includes a terrain sensing and sensor elevation control system to maintain the sensors in close ground proximity. The deployed sensor apparatus is particularly useful in collecting data in work environments where human access is difficult due to the presence of hazardous conditions, rough terrain, or other circumstances that prevent efficient data collection by conventional methods. Such work environments include hazardous waste sites, unexploded ordnance sites, or construction sites. Data collection in these environments by utilizing the deployed sensor apparatus is desirable in order to protect human health and safety, or to assist in planning daily operations to increase efficiency.

  20. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    NASA Astrophysics Data System (ADS)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  1. HIV testing of construction workers in the Western Cape, South Africa.

    PubMed

    Bowen, Paul; Govender, Rajen; Edwards, Peter; Cattell, Keith

    2015-01-01

    With an infection rate estimated at 14%, the South African construction industry is one of the economic sectors most adversely affected by the HIV/AIDS pandemic. Construction workers are considered a high-risk group. The provision and uptake of voluntary counselling and testing (VCT) is critical to reducing transmission rates. This study examined the testing behaviour of site-based construction workers in terms of demographic and lifestyle risk behaviour characteristics to help inform better strategies for work-based interventions by construction firms. A total of 512 workers drawn from six firms operating on 18 construction sites in the Western Cape province participated in the study. Twenty-seven per cent of the participants reported never having been tested for HIV. Results indicate that females (aOR = 4.45, 95% CI, 1.25-15.82), older workers (aOR = 1.40, 95% CI, 1.08-1.81), permanent workers (aOR = 1.67, 95% CI, 1.11-2.50) and workers whom had previously used a condom (aOR = 1.93, 95% CI, 1.02-3.65) were significantly more likely to have been tested. Ethnicity was not significantly related to prior testing. Identification of these subgroups within the industry has implications for the development of targeted work-based intervention programmes to promote greater HIV testing among construction workers in South Africa.

  2. Basic repository source term and data sheet report: Lavender Canyon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    This report is one of a series describing studies undertaken in support of the US Department of Energy Civilian Radioactive Waste Management (CRWM) Program. This study contains the derivation of values for environmental source terms and resources consumed for a CRWM repository. Estimates include heavy construction equipment; support equipment; shaft-sinking equipment; transportation equipment; and consumption of fuel, water, electricity, and natural gas. Data are presented for construction and operation at an assumed site in Lavender Canyon, Utah. 3 refs; 6 tabs.

  3. The Chicago Center for Green Technology: life-cycle assessment of a brownfield redevelopment project

    NASA Astrophysics Data System (ADS)

    Brecheisen, Thomas; Theis, Thomas

    2013-03-01

    The sustainable development of brownfields reflects a fundamental, yet logical, shift in thinking and policymaking regarding pollution prevention. Life-cycle assessment (LCA) is a tool that can be used to assist in determining the conformity of brownfield development projects to the sustainability paradigm. LCA was applied to the process of a real brownfield redevelopment project, now known as the Chicago Center for Green Technology, to determine the cumulative energy required to complete the following redevelopment stages: (1) brownfield assessment and remediation, (2) building rehabilitation and site development and (3) ten years of operation. The results of the LCA have shown that operational energy is the dominant life-cycle stage after ten years of operation. The preservation and rehabilitation of the existing building, the installation of renewable energy systems (geothermal and photovoltaic) on-site and the use of more sustainable building products resulted in 72 terajoules (TJ) of avoided energy impacts, which would provide 14 years of operational energy for the site. Methodological note: data for this life-cycle assessment were obtained from project reports, construction blueprints and utility bills.

  4. Hazardous Waste Cleanup: G.E.C. Alstrom Transportation Incorporated in Hornell, New York

    EPA Pesticide Factsheets

    The primary use at G.E.C. has been for railcar repair and construction. The two main operational areas have been a refueling area and a large service shop. The major users of the site have included the Erie-Lackawana Railroad, Conrail, General Electric

  5. COST MODEL FOR LARGE URBAN SCHOOLS.

    ERIC Educational Resources Information Center

    O'BRIEN, RICHARD J.

    THIS DOCUMENT CONTAINS A COST SUBMODEL OF AN URBAN EDUCATIONAL SYSTEM. THIS MODEL REQUIRES THAT PUPIL POPULATION AND PROPOSED SCHOOL BUILDING ARE KNOWN. THE COST ELEMENTS ARE--(1) CONSTRUCTION COSTS OF NEW PLANTS, (2) ACQUISITION AND DEVELOPMENT COSTS OF BUILDING SITES, (3) CURRENT OPERATING EXPENSES OF THE PROPOSED SCHOOL, (4) PUPIL…

  6. 47 CFR 27.1170 - Payment issues.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... emission designator. If a prior coordination notice (PCN) under § 101.103(d) of this chapter is prepared... Bands Cost-Sharing Policies Governing Microwave Relocation from the 2110-2150 Mhz and 2160-2200 Mhz Bands § 27.1170 Payment issues. Prior to initiating operations for a newly constructed site or modified...

  7. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  8. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  9. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  10. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  11. 76 FR 52649 - Golden Triangle Storage, Inc.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... Triangle Storage, Inc.; Notice of Application On August 5, 2011, Golden Triangle Storage, Inc. (Golden... construct and operate two new salt dome storage caverns at its existing storage site located in Jefferson... Triangle Storage, Inc., 1200 Smith Street, Suite 900, Houston, TX 77002, (832) 397-8642 or John F...

  12. 76 FR 43319 - Record of Decision for the Continued Operation of the Y-12 National Security Complex

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...; visual resources; site infrastructure; traffic and transportation; geology and soils; air quality and... excavation, soil characterization, transportation or disposal associated with the UPF. Response. The Y-12 Final SWEIS includes an analysis of the impacts of the UPF construction, including soil disturbance...

  13. Requirements analysis report for transport estimation, preconstruction, construction, decision support and electronic bidding systems

    DOT National Transportation Integrated Search

    2009-01-01

    Info Tech conducted an on-site visit at the Connecticut Department of Transportation in Newington : from October 27-31, 2008. The purpose of the visit was to conduct an analysis of ConnDOTs : processes and to review the operations and business sys...

  14. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build newmore » production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.« less

  15. Volunteers Oriented Interface Design for the Remote Navigation of Rescue Robots at Large-Scale Disaster Sites

    NASA Astrophysics Data System (ADS)

    Yang, Zhixiao; Ito, Kazuyuki; Saijo, Kazuhiko; Hirotsune, Kazuyuki; Gofuku, Akio; Matsuno, Fumitoshi

    This paper aims at constructing an efficient interface being similar to those widely used in human daily life, to fulfill the need of many volunteer rescuers operating rescue robots at large-scale disaster sites. The developed system includes a force feedback steering wheel interface and an artificial neural network (ANN) based mouse-screen interface. The former consists of a force feedback steering control and a six monitors’ wall. It provides a manual operation like driving cars to navigate a rescue robot. The latter consists of a mouse and a camera’s view displayed in a monitor. It provides a semi-autonomous operation by mouse clicking to navigate a rescue robot. Results of experiments show that a novice volunteer can skillfully navigate a tank rescue robot through both interfaces after 20 to 30 minutes of learning their operation respectively. The steering wheel interface has high navigating speed in open areas, without restriction of terrains and surface conditions of a disaster site. The mouse-screen interface is good at exact navigation in complex structures, while bringing little tension to operators. The two interfaces are designed to switch into each other at any time to provide a combined efficient navigation method.

  16. The Willard L. Eccles Observatory: Commissioning and Development of Remote Operation Capabilities

    NASA Astrophysics Data System (ADS)

    Springer, Wayne; Dawson, Kyle; Gondolo, Paolo; Ricketts, Paul; Ramsrud, Nicolas; Samarasingha, Upul

    2011-03-01

    The University of Utah completed construction of the Willard L. Eccles Observatory located on Frisco Peak near Milford, UT in October 2009. The observatory site is located on a prominent peak at an altitude of approximately 9600 feet in a region with minimal light pollution. The Frisco Peak site was chosen after careful consideration of many factors including climate, light pollution and available infrastructure. The facility houses a 32" telescope manufactured by DFM Engineering of Longmont, CO. Further development of remote operation capabilities is currently being undertaken. Monitoring of the weather and seeing conditions are being performed and confirm the excellent nature of the site for astronomical observations. The observatory facilities will be used for educational and public outreach activities as well as research projects. A description of the facility and its planned use will be provided.

  17. Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat County

    1995-09-01

    CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less

  18. Cost containment and KSC Shuttle facilities or cost containment and aerospace construction

    NASA Technical Reports Server (NTRS)

    Brown, J. A.

    1985-01-01

    This presentation has the objective to show examples of Cost Containment of Aerospace Construction at Kennedy Space Center (KSC), taking into account four major levels of Project Development of the Space Shuttle Facilities. The levels are related to conceptual criteria and site selection, the design of construction and ground support equipment, the construction of facilities and ground support equipment (GSE), and operation and maintenance. Examples of cost containment are discussed. The continued reduction of processing time from landing to launching represents a demonstration of the success of the cost containment methods. Attention is given to the factors which led to the selection of KSC, the use of Cost Engineering, the employment of the Construction Management Concept, and the use of Computer Aided Design/Drafting.

  19. Environmental impact statement Space Shuttle advanced solid rocket motor program

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The proposed action is design, development, testing, and evaluation of Advanced Solid Rocket Motors (ASRM) to replace the motors currently used to launch the Space Shuttle. The proposed action includes design, construction, and operation of new government-owned, contractor-operated facilities for manufacturing and testing the ASRM's. The proposed action also includes transport of propellant-filled rocket motor segments from the manufacturing facility to the testing and launch sites and the return of used and/or refurbished segments to the manufacturing site. Sites being considered for the new facilities include John C. Stennis Space Center, Hancock County, Mississippi; the Yellow Creek site in Tishomingo County, Mississippi, which is currently in the custody and control of the Tennessee Valley Authority; and John F. Kennedy Space Center, Brevard County, Florida. TVA proposes to transfer its site to the custody and control of NASA if it is the selected site. All facilities need not be located at the same site. Existing facilities which may provide support for the program include Michoud Assembly Facility, New Orleans Parish, Louisiana; and Slidell Computer Center, St. Tammany Parish, Louisiana. NASA's preferred production location is the Yellow Creek site, and the preferred test location is the Stennis Space Center.

  20. Applying Sensor-Based Technology to Improve Construction Safety Management.

    PubMed

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-08-11

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.

  1. Applying Sensor-Based Technology to Improve Construction Safety Management

    PubMed Central

    Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng

    2017-01-01

    Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions. PMID:28800061

  2. E-ELT Site Chosen - World's Biggest Eye on the Sky to be Located on Armazones, Chile

    NASA Astrophysics Data System (ADS)

    2010-04-01

    On 26 April 2010, the ESO Council selected Cerro Armazones as the baseline site for the planned 42-metre European Extremely Large Telescope (E-ELT). Cerro Armazones is a mountain at an altitude of 3060 metres in the central part of Chile's Atacama Desert, some 130 kilometres south of the town of Antofagasta and about 20 kilometres from Cerro Paranal, home of ESO's Very Large Telescope. "This is an important milestone that allows us to finalise the baseline design of this very ambitious project, which will vastly advance astronomical knowledge," says Tim de Zeeuw, ESO's Director General. "I thank the site selection team for the tremendous work they have done over the past few years." ESO's next step is to build a European extremely large optical/infrared telescope (E-ELT) with a primary mirror 42 metres in diameter. The E-ELT will be "the world's biggest eye on the sky" - the only such telescope in the world. ESO is drawing up detailed construction plans together with the community. The E-ELT will address many of the most pressing unsolved questions in astronomy, and may, eventually, revolutionise our perception of the Universe, much as Galileo's telescope did 400 years ago. The final go-ahead for construction is expected at the end of 2010, with the start of operations planned for 2018. The decision on the E-ELT site was taken by the ESO Council, which is the governing body of the Organisation composed of representatives of ESO's fourteen Member States, and is based on an extensive comparative meteorological investigation, which lasted several years. The majority of the data collected during the site selection campaigns will be made public in the course of the year 2010. Various factors needed to be considered in the site selection process. Obviously the "astronomical quality" of the atmosphere, for instance, the number of clear nights, the amount of water vapour, and the "stability" of the atmosphere (also known as seeing) played a crucial role. But other parameters had to be taken into account as well, such as the costs of construction and operations, and the operational and scientific synergy with other major facilities (VLT/VLTI, VISTA, VST, ALMA and SKA etc). In March 2010, the ESO Council was provided with a preliminary report with the main conclusions from the E-ELT Site Selection Advisory Committee [1]. These conclusions confirmed that all the sites examined in the final shortlist (Armazones, Ventarrones, Tolonchar and Vizcachas in Chile, and La Palma in Spain) have very good conditions for astronomical observing, each one with its particular strengths. The technical report concluded that Cerro Armazones, near Paranal, stands out as the clearly preferred site, because it has the best balance of sky quality for all the factors considered and can be operated in an integrated fashion with ESO's Paranal Observatory. Cerro Armazones and Paranal share the same ideal conditions for astronomical observations. In particular, over 320 nights are clear per year. Taking into account the very clear recommendation of the Site Selection Advisory Committee and all other relevant aspects, especially the scientific quality of the site, Council has now endorsed the choice of Cerro Armazones as the E-ELT baseline site [2]. "Adding the transformational scientific capabilities of the E-ELT to the already tremendously powerful integrated VLT observatory guarantees the long-term future of Paranal as the most advanced optical/infrared observatory in the world and further strengthens ESO's position as the world-leading organisation for ground-based astronomy," says de Zeeuw. In anticipation of the choice of Cerro Armazones as the future site of the E-ELT and to facilitate and support the project, the Chilean Government has agreed to donate to ESO a substantial tract of land contiguous to ESO's Paranal property and containing Armazones in order to ensure the continued protection of the site against all adverse influences, in particular light pollution and mining activities. Notes [1] The independent E-ELT Site Selection Advisory Committee (SSAC) has been analysing results from several possible sites worldwide in great detail. Similar efforts have been carried out by the Thirty-Meter Telescope (TMT) site selection team from the US. For the sake of efficiency, the sites pre-selected by the TMT team (all in North and South America) were not studied by the SSAC, as the TMT team shared their data with the SSAC. Two of the sites on the SSAC short list, including Armazones, were on the TMT list. [2] The full ESO Council Resolution reads as follow: Resolution of ESO Council on the Baseline Site for the E-ELT Recognising * the very clear recommendation from the Site Selection Advisory Committee that the E-ELT should be located on Cerro Armazones in Northern Chile * the considerable scientific synergy that would result between the E-ELT and future facilities in the Southern Hemisphere, most notably ALMA and SKA * the operational and scientific synergies with Paranal that would result and expressing its warmest appreciation for * the very generous offers from Spain and Chile to host the E-ELT * the very considerable contributions to the quality and depth of the discussion on the siting of the E-ELT made by Chile and Spain in the course of developing their offers; Council has concluded that the overriding driver for the decision on the location of the E-ELT should be the scientific quality of the site. The scientific qualities of Cerro Armazones and the positive impact that locating the E-ELT there will have on the future scientific leadership of ESO are sufficiently compelling to outweigh the very substantial offer made by Spain. Council has therefore resolved to approve the recommendation of the Director General to adopt Cerro Armazones in Chile as the baseline site for the E-ELT. Council noted that this decision is essential for the completion of the construction proposal for decision at a later date. More information ESO, the European Southern Observatory, is the foremost intergovernmental astronomy organisation in Europe and the world's most productive astronomical observatory. It is supported by 14 countries: Austria, Belgium, the Czech Republic, Denmark, France, Finland, Germany, Italy, the Netherlands, Portugal, Spain, Sweden, Switzerland and the United Kingdom. ESO carries out an ambitious programme focused on the design, construction and operation of powerful ground-based observing facilities enabling astronomers to make important scientific discoveries. ESO also plays a leading role in promoting and organising cooperation in astronomical research. ESO operates three unique world-class observing sites in Chile: La Silla, Paranal and Chajnantor. At Paranal, ESO operates the Very Large Telescope, the world's most advanced visible-light astronomical observatory and VISTA, the world's largest survey telescope. ESO is the European partner of a revolutionary astronomical telescope ALMA, the largest astronomical project in existence.

  3. Photographic copy of photograph, dated September 1971, (original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, dated September 1971, (original print in possession of CSSD-HO, Huntsville, AL). Photographer unknown. Aerial view looking north of remote sprint launch site #2, during construction. In the foreground is the remote launch operations building (RLOB); sprint silos are being installed in the background - Stanley R. Mickelsen Safeguard Complex, Remote Sprint Launch Site No. 2, West of Mile Marker 220 on State Route 1, 6.0 miles North of Langdon, ND, Nekoma, Cavalier County, ND

  4. KSC-2011-1154

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  5. KSC-2011-1155

    NASA Image and Video Library

    2011-01-20

    CAPE CANAVERAL, Fla. -- A traditional ribbon-cutting ceremony takes place outside the Propellants North Administration and Maintenance Facility at NASA's Kennedy Space Center in Florida. From left, are Thomas Wilczek, contracting officer technical representative/project manager for NASA Construction of Facilities; Bradley O’Toole, NASA contracting officer; James Wright, deputy assistant administrator for the Office of Strategic Infrastructure at NASA Headquarters; Frank Kline, NASA Construction of Facility project manager; Bob Cabana, Kennedy's center director; Mike Benik, director of Kennedy's Center Operations; Ward Davis, president of HW Davis Construction Inc.; and Rick Ferreira, chief operating officer of Jones Edmunds and Associates Inc. Propellants North consists of two buildings, one to store cryogenic fuel transfer equipment and one to house personnel who support fueling spacecraft. The recently rebuilt buildings will be NASA's first carbon neutral facility, which means it will produce enough energy on site from renewable sources to offset what it requires to operate. The facility also will reach for the U.S. Green Building Council's Leadership in Environmental and Energy Design (LEED) Platinum status, which is the highest LEED rating. Photo credit: NASA/Kim Shiflett

  6. Finite-element time evolution operator for the anharmonic oscillator

    NASA Technical Reports Server (NTRS)

    Milton, Kimball A.

    1995-01-01

    The finite-element approach to lattice field theory is both highly accurate (relative errors approximately 1/N(exp 2), where N is the number of lattice points) and exactly unitary (in the sense that canonical commutation relations are exactly preserved at the lattice sites). In this talk I construct matrix elements for dynamical variables and for the time evolution operator for the anharmonic oscillator, for which the continuum Hamiltonian is H = p(exp 2)/2 + lambda q(exp 4)/4. Construction of such matrix elements does not require solving the implicit equations of motion. Low order approximations turn out to be extremely accurate. For example, the matrix element of the time evolution operator in the harmonic oscillator ground state gives a results for the anharmonic oscillator ground state energy accurate to better than 1 percent, while a two-state approximation reduces the error to less than 0.1 percent.

  7. Methodology of environmental diagnosis for construction and demolition waste landfills: a tool for planning and making decisions.

    PubMed

    Garrido, E; Calvo, F; Ramos, A F; Zamorano, M

    2005-11-01

    Current legislation in the European Union regarding landfills provides measures, procedures and guidance to prevent or reduce, insofar as possible, negative effects on the environment. This means that Member States must take measures so that landfills cannot operate unless the operator first presents a plan for the site, which includes the implementation of improvements considered necessary by the engineer for compliance with regulations. Researchers at the University of Granada have developed a method to ascertain the degree of environmental impact that a construction and demolition waste landfill may produce on its immediate surroundings. This methodology is based on environmental indexes; its objective is to give crucial information concerning possible environmental problems produced by a landfill. The data thus obtained will permit the elaboration of guidelines for improvements in the location, design, and operation of landfills, or in extreme cases, their dosing, sealing, and rehabilitation.

  8. Eddy Current Flow Measurements in the FFTF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nielsen, Deborah L.; Polzin, David L.; Omberg, Ronald P.

    2017-02-02

    The Fast Flux Test Facility (FFTF) is the most recent liquid metal reactor (LMR) to be designed, constructed, and operated by the U.S. Department of Energy (DOE). The 400-MWt sodium-cooled, fast-neutron flux reactor plant was designed for irradiation testing of nuclear reactor fuels and materials for liquid metal fast breeder reactors. Following shut down of the Clinch River Breeder Reactor Plant (CRBRP) project in 1983, FFTF continued to play a key role in providing a test bed for demonstrating performance of advanced fuel designs and demonstrating operation, maintenance, and safety of advanced liquid metal reactors. The FFTF Program provides valuablemore » information for potential follow-on reactor projects in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor control and operations. This report provides HEDL-TC-1344, “ECFM Flow Measurements in the FFTF Using Phase-Sensitive Detectors”, March 1979.« less

  9. 76 FR 18751 - National Fuel Gas Supply Corporation; Tennessee Gas Pipeline Company; Notice of Intent To Prepare...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Prepare an Environmental Assessment for the Proposed Northern Access Project and Station 230c Project... County, Pennsylvania. TGP's Station 230C Project would involve construction and operation of facilities... conduct two onsite environmental reviews of National Fuel's proposed East Aurora Compressor Station site...

  10. Environmental factors in golf course development: a case study

    Treesearch

    Lisa Mason-Fradette; Robert S. Bristow

    1995-01-01

    Environmental constraints become apparent when one considers the maintenance and operation of a golf course. The high demand for water, proximity to surface or ground water supplies and the potential threats by the perpetuation of the grounds. This investigation of a new golf course construction site will identify the threats to the environment.

  11. Borehole Data Package for One CY 2005 CERCLA Well 699-S20-E10, 300-FF-5 Operable Unit, Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Bruce A.; Bjornstad, Bruce N.; Lanigan, David C.

    2006-03-29

    This report supplies the information obtained during drilling, characterization, and installation of the new groundwater monitoring well. This document also provides a compilation of hydrogeologic and well construction information obtained during drilling, well development, and sample collection/analysis activities.

  12. 76 FR 387 - Atomic Safety and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility) December 17, 2010... construction and operation of a gas centrifuge uranium enrichment facility--denoted as the Eagle Rock... site at http://www.nrc.gov/materials/fuel-cycle-fac/arevanc.html . These and other documents relating...

  13. Construction site Voice Operated Information System (VOIS) test

    NASA Astrophysics Data System (ADS)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  14. Re-constructing historical Adélie penguin abundance estimates by retrospectively accounting for detection bias.

    PubMed

    Southwell, Colin; Emmerson, Louise; Newbery, Kym; McKinlay, John; Kerry, Knowles; Woehler, Eric; Ensor, Paul

    2015-01-01

    Seabirds and other land-breeding marine predators are considered to be useful and practical indicators of the state of marine ecosystems because of their dependence on marine prey and the accessibility of their populations at breeding colonies. Historical counts of breeding populations of these higher-order marine predators are one of few data sources available for inferring past change in marine ecosystems. However, historical abundance estimates derived from these population counts may be subject to unrecognised bias and uncertainty because of variable attendance of birds at breeding colonies and variable timing of past population surveys. We retrospectively accounted for detection bias in historical abundance estimates of the colonial, land-breeding Adélie penguin through an analysis of 222 historical abundance estimates from 81 breeding sites in east Antarctica. The published abundance estimates were de-constructed to retrieve the raw count data and then re-constructed by applying contemporary adjustment factors obtained from remotely operating time-lapse cameras. The re-construction process incorporated spatial and temporal variation in phenology and attendance by using data from cameras deployed at multiple sites over multiple years and propagating this uncertainty through to the final revised abundance estimates. Our re-constructed abundance estimates were consistently higher and more uncertain than published estimates. The re-constructed estimates alter the conclusions reached for some sites in east Antarctica in recent assessments of long-term Adélie penguin population change. Our approach is applicable to abundance data for a wide range of colonial, land-breeding marine species including other penguin species, flying seabirds and marine mammals.

  15. Modelling and operation strategies of DLR's large scale thermocline test facility (TESIS)

    NASA Astrophysics Data System (ADS)

    Odenthal, Christian; Breidenbach, Nils; Bauer, Thomas

    2017-06-01

    In this work an overview of the TESIS:store thermocline test facility and its current construction status will be given. Based on this, the TESIS:store facility using sensible solid filler material is modelled with a fully transient model, implemented in MATLAB®. Results in terms of the impact of filler site and operation strategies will be presented. While low porosity and small particle diameters for the filler material are beneficial, operation strategy is one key element with potential for optimization. It is shown that plant operators have to ponder between utilization and exergetic efficiency. Different durations of the charging and discharging period enable further potential for optimizations.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configurationmore » management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility tomore » meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.« less

  18. Impact of dust filter installation in ironworks and construction on brownfield area on the toxic metal concentration in street and house dust (Celje, Slovenia).

    PubMed

    Zibret, Gorazd

    2012-05-01

    This article presents the impact of the ecological investment in ironworks (dust filter installation) and construction works at a highly contaminated brownfield site on the chemical composition of household dust (HD) and street sediment (SS) in Celje, Slovenia. The evaluation is based on two sampling campaigns: the first was undertaken 1 month before the ecological investment became operational and the second 3 years later. The results show that dust filter installations reduced the content of Co, Cr, Fe, Mn, Mo, W and Zn on average by 58% in HD and by 51% in SS. No reduction was observed at sampling points in the upwind direction from the ironworks. By contrast, the impact of the construction works on the highly contaminated brownfield site was detected by a significant increase (on average by 37%) of elements connected to the brownfield contamination in SS. Such increase was not detected in HD.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, A.L.; Purdy, S.; Tempelis, D.

    The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less

  20. Environmental Assessment for the Construction and Operation of a New Shoppette/Gas Station, Class Six Store, and Name-Brand Fast Food Store at Joint Base Andrews Camp Springs, Prince George’s County, Maryland

    DTIC Science & Technology

    2010-02-01

    approximately 3.0-acre site. The facility would include retail gasoline sales through the installation of three 20,000-gallon double -walled tanks; 16 multi...construction activities; soil erosion control methods and best management practices would reduce potential for effects; additional impervious surfaces...through the installation of three 20,000-gallon, double -walled tanks; 16 multi- product dispensers with 32 fuel dispenser nozzles; a canopy roofing

  1. Environmental Assessment: BRAC Construction and Operation of Armed Forces Reserve Center at Malmstrom Air Force Base, Great Falls, Montana

    DTIC Science & Technology

    2009-06-01

    Day-Night Levels in Urban Areas in the United States .................................4-31 4-5 Typical Construction Equipment and Composite Site...ramp 2 Reefer 4 1.5-ton Trailer 1 2.5-ton Trailer 1 5-ton Trailer 4 Mobile Kitchen Trailer 1 4-kilovolt (kV) Generator sets 3 10-kV generator...encountered in urban areas of the U.S. In general, 30 to 50 dB represents a quiet classification, 65 to 70 dB represents a moderately noisy

  2. Environmental Impact Statement: Construction and Operation of Titan IV/Centaur Launch Complex, Vandenberg Air Force Base, California. Volume 3

    DTIC Science & Technology

    1990-08-01

    Form 7.10 Draft EIS Public Hearings Attendance and Speakers Lists 8.0 LIST OF ACRONYMS AND ABBREVIATIONS APPENDIX A: GLOBAL WARMING APPENDIX B: WHITE...expected to contribute significantly to global warming . Impacts to air quality from operations would be the same for the alternative sites. NOISE Noise...and Abbreviations List of Acronyms and Abbreviations used in the Final EM. ● Appendix A - Global Warming This appendix provides a brief discussion of

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brenda R. Pace; Cameron Brizzee; Hollie Gilbert

    The U. S. Department of Energy, Idaho Operations Office is considering options for construction of a multipurpose haul road to transport materials and wastes between the Materials and Fuels Complex (MFC) and other Idaho National Laboratory (INL) Site facilities. The proposed road will be closed to the public and designed for limited year-round use. Two primary options are under consideration: a new route south of the existing T-25 power line road and an upgrade to road T-24. In the Spring of 2010, archaeological field surveys and initial coordination and field reconnaissance with representatives from the Shoshone-Bannock Tribes were completed tomore » identify any resources that may be adversely affected by the proposed road construction and to develop recommendations to protect any listed or eligible for listing on the National Register of Historic Places. The investigations showed that 24 archaeological resources and one historic marker are located in the area of potential effects for road construction and operation south of the T-25 powerline road and 27archaeological resources are located in the area of potential effects for road construction and operation along road T-24. Generalized tribal concerns regarding protection of natural resources were also documented in both road corridors. This report outlines recommendations for additional investigations and protective measures that can be implemented to minimize adverse impacts to the identified resources.« less

  4. Building a pipeline of talent for operating radio observatories

    NASA Astrophysics Data System (ADS)

    Wingate, Lory M.

    2016-07-01

    The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.

  5. Design of an autonomous lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    1990-01-01

    In order to prepare a site for a lunar base, an autonomously operated construction vehicle is necessary. Discussed here is a Lunar Construction Utility Vehicle (LCUV), which uses interchangeable construction implements. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device has been designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and a computer interface. A study of hydrogen-oxygen fuel cells produced estimates of reactant and product requirements and identified multilayer insulation needs. Research on the 100-kW heat rejection system determined that it is necessary to transport the radiator panel on a utility trailer. Extensive logistical support for the 720 hour use cycle requires further study.

  6. Balancing Energy, Food Security, and Critical Ecosystems: Dam Siting, Design and Operations in the Mekong River Basin

    NASA Astrophysics Data System (ADS)

    Wild, T. B.; Reed, P. M.; Loucks, D.

    2016-12-01

    The Mekong River basin in Southeast Asia is one of several river basins with exceptionally high biodiversity value where intensive hydropower dam development is anticipated. In the Mekong basin, over 100 dams are planned to be constructed in the next 20-30 years. As planned, these dams will alter the river's natural water, sediment and nutrient flows, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most productive freshwater fish habitats, upon which some 60 million people depend for food and income security. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and adult fish/larvae passage. We present a successful case study wherein we explored such alternative SDO opportunities in partnership with the Government of Cambodia for Sambor Dam, planned to be built on the main stem of the Mekong. Sambor would be one of the world's longest dams, spanning 18 km across the river just upstream of (1) Tonle Sap Lake, which supplies 70% of Cambodians' protein, and (2) the Mekong Delta in Vietnam, responsible for 50% of Vietnam's rice production. We will describe key dam siting and design modifications required to mitigate ecological impacts. We will then focus on the most promising alternative dam siting/design concept, exploring the reservoir operations space to demonstrate that a complex set of tradeoffs exist among a diverse set of energy and ecosystem objectives. Results indicate that even for a hydrologically small reservoir, a wide array of potential reservoir operating policies exist that have vastly different food-energy implications. While some policies would significantly mitigate ecological impacts, many policies exist that would pose a severe threat to the sustainability of the fishery. Failure to sample the reservoir operations space at appropriate resolution could result in failure to accurately identify tradeoffs and vulnerabilities. We explore energy-ecosystem tradeoffs while demonstrating to stakeholders the impacts of transitioning from their initial deterministic analysis that largely focused on energy revenue to broader many-objective stochastic problem formulations.

  7. Application Analysis of BIM Technology in Metro Rail Transit

    NASA Astrophysics Data System (ADS)

    Liu, Bei; Sun, Xianbin

    2018-03-01

    With the rapid development of urban roads, especially the construction of subway rail transit, it is an effective way to alleviate urban traffic congestion. There are limited site space, complex resource allocation, tight schedule, underground pipeline complex engineering problems. BIM technology, three-dimensional visualization, parameterization, virtual simulation and many other advantages can effectively solve these technical problems. Based on the project of Shenzhen Metro Line 9, BIM technology is innovatively researched throughout the lifecycle of BIM technology in the context of the metro rail transit project rarely used at this stage. The model information file is imported into Navisworks for four-dimensional animation simulation to determine the optimum construction scheme of the shield machine. Subway construction management application platform based on BIM and private cloud technology, the use of cameras and sensors to achieve electronic integration, dynamic monitoring of the operation and maintenance of underground facilities. Make full use of the many advantages of BIM technology to improve the engineering quality and construction efficiency of the subway rail transit project and to complete the operation and maintenance.

  8. Gnss Geodetic Monitoring as Support of Geodynamics Research in Colombia, South America

    NASA Astrophysics Data System (ADS)

    Mora-Paez, H.; Acero-Patino, N.; Rodriguez-Zuluaga, J. S.; Diederix, H.; Bohorquez-Orozco, O. P.; Martinez-Diaz, G. P.; Diaz-Mila, F.; Giraldo-Londono, L. S.; Cardozo-Giraldo, S.; Vasquez-Ospina, A. F.; Lizarazo, S. C.

    2013-05-01

    To support the geodynamics research at the northwestern corner of South America, GEORED, the acronym for "Geodesia: Red de Estudios de Deformación" has been adopted for the Project "Implementation of the National GNSS Network for Geodynamics" carried out by the Colombian Geological Survey, (SGC), formerly INGEOMINAS. Beginning in 2007, discussions within the GEORED group led to a master plan for the distribution of the base permanent GPS/GNSS station array and specific areas of interest for campaign site construction. The use of previously identified active faults as preferred structures along which stresses are transferred through the deformational area led to the idea of segmentation of the North Andes within Colombia into 20 tectonic sub-blocks. Each of the 20 sub-blocks is expected to have, at least, three-four permanent GPS/GNSS stations within the block along with construction of campaign sites along the boundaries. Currently, the GEORED Network is managing 46 continuously including: 40 GEORED GPS/GNSS continuously operating stations; 4 GNSS continuously operating stations provided by the COCONet (Continuously Operating Caribbean GPS Observational Network) Project; the Bogotá IGS GPS station (BOGT), installed in 1994 under the agreement between JPL-NASA and the SGC; and the San Andres Island station, installed in 2007 under the MOU between UCAR and the SGC. In addition to the permanent installations, more than 230 GPS campaign sites have been constructed and are being occupied one time per year. The Authority of the Panama Canal and the Escuela Politecnica de Quito have also provided data of 4 and 5 GPS/GNSS stations respectively. The GPS data are processed using the GIPSY-OASIS II software, and the GPS time series of daily station positions give fundamental information for both regional and local geodynamics studies. Until now, we have obtained 100 quality vector velocities for Colombia, 23 of them as part of the permanent network. The GPS/GNSS stations are located on the three major plates that interact within the Wide Plate Margin Deformation Zone including existing permanent installations on IGS Galapagos and Malpelo Islands on the Nazca Plate, and San Andres Island on the Caribbean plate. The velocity vectors confirm the oblique subduction of the Nazca Plate and Carnegie aseismic ridge collision processes at the Colombia-Ecuador trench which are assumed to be the mechanism for the transpressional deformation and the "escape" of the North Andes Block (NAB). The northernmost vectors in Colombia are indicative of the ongoing collision of the Panama Arc with northwestern Colombia. Planned for the year 2013 is the installation of 10 additional GNSS continuously operating stations, and construction of 20 GPS campaign sites.

  9. Optimization of Treatment to Conserve Water at the US Naval Academy

    DTIC Science & Technology

    2009-05-06

    Established 1845 • 1,160 Acres • 3.46 MGD Iron Removal WTP : • Constructed 1971 • Modifications in 1998 & 2004 5/6/2009 Source Water: • 3 wells...5/6/2009 5/6/2009 Title 5/6/2009 WTP Operations: • Manned 24/7 but operated 14 hrs/day • 1.8 MGD average production • 50,000 g/hr blow-down from...experience for future on-site facility 16 Title/Group/Section,etc. 5/6/2009 5/6/2009 Minimize Plant Shutdowns: • Most WTPs operate best 24/7 • Ea. shut-down

  10. Evaluation of the varying Naturally Occurring Asbestos mitigation measures at School and Commercial construction projects in California

    NASA Astrophysics Data System (ADS)

    Kalika, S.

    2012-12-01

    In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. L. Poe, Jr.; P.F. Wise

    The U.S. Department of Energy (DOE) is preparing a proposal to construct, operate 2nd monitor, and eventually close a repository at Yucca Mountain in Nye County, Nevada, for the geologic disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW). As part of this effort, DOE has prepared a viability assessment and an assessment of potential consequences that may exist if the repository is not constructed. The assessment of potential consequences if the repository is not constructed assumes that all SNF and HLW would be left at the generator sites. These include 72 commercial generator sites (three commercial facilitymore » pairs--Salem and Hope Creek, Fitzpatrick and Nine Mile Point, and Dresden and Morris--would share common storage due to their close proximity to each other) and five DOE sites across the country. DOE analyzed the environmental consequences of the effects of the continued storage of these materials at these sites in a report titled Continued Storage Analysis Report (CSAR; Reference 1 ) . The CSAR analysis includes a discussion of the degradation of these materials when exposed to the environment. This document describes the environmental parameters that influence the degradation analyzed in the CSAR. These include temperature, relative humidity, precipitation chemistry (pH and chemical composition), annual precipitation rates, annual number of rain-days, and annual freeze/thaw cycles. The document also tabulates weather conditions for each storage site, evaluates the degradation of concrete storage modules and vaults in different regions of the country, and provides a thermal analysis of commercial SNF in storage.« less

  12. Distribution of materials in construction and demolition waste in Portugal.

    PubMed

    Coelho, André; de Brito, Jorge

    2011-08-01

    It may not be enough simply to know the global volume of construction and demolition waste (CDW) generated in a certain region or country if one wants to estimate, for instance, the revenue accruing from separating several types of materials from the input entering a given CDW recycling plant. A more detailed determination of the distribution of the materials within the generated CDW is needed and the present paper addresses this issue, distinguishing different buildings and types of operation (new construction, retrofitting and demolition). This has been achieved by measuring the materials from buildings of different ages within the Portuguese building stock, and by using direct data from demolition/retrofitting sites and new construction average values reported in the literature. An attempt to establish a benchmark with other countries is also presented. This knowledge may also benefit industry management, especially that related to CDW recycling, helping to optimize procedures, equipment size and operation and even industrial plant spatial distribution. In an extremely competitive market, where as in Portugal low-tech and high environmental impact procedures remain the norm in the construction industry (in particular, the construction waste industry), the introduction of a successful recycling industry is only possible with highly optimized processes and based on a knowledge-based approach to problems.

  13. Installation Restoration Program. Phase 1 - Records Search, Travis AFB, California

    DTIC Science & Technology

    1983-08-01

    Personnel Transportation Assistance Office Navy Construction Office (ROICC) Navy Quick Trans CPE Cargo OL-K AFESC/CEMRT OL OH AF Commissary/ FCS Operating Loc...du u U C AS I- z I- < L z Z ’CIA F,.- **z z - C -o -C Z. -2 X.,~a S.. ’ l - x CO I II I EAI IIV I - -. I t1 -1 z In-’S I LA- 0..u 2gU, 0 z u Fc -jIL...used at the site comprised, AFFF , protein foam and water. The site has no berms or dikes to contain the runoff. Surface runoff from the site has to

  14. 4D modeling in high-rise construction

    NASA Astrophysics Data System (ADS)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  15. Ny-Ålesund Observatory: What Has Been Done?

    NASA Astrophysics Data System (ADS)

    Tangen, Leif Morten

    2016-12-01

    The existing 20-m radio telescope in Ny-Ålesund was put into operation in 1994. The telescope is more than 20 years old now and is ready for retirement. We decided to build a VGOS core site with twin telescopes. The existing telescope is just 70 meters away from the airport runway and the CAA did not allow us to build anything new as close. The new site is about 1,500 meters northwest of the old telescope and we had to build a road with a bridge. This was finished in summer 2014 and the construction work at the new site started in October 2014. It is challenging to do construction work during the winter time at 79°N with permafrost. During the winter, the VLBI foundation was built. The station, SLR, and gravity buildings were built as well. This presentation will show what has been done until now and different solutions for the telescopes. The telescopes are scheduled to arrive in April 2016.

  16. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  17. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  18. The multiscale coarse-graining method. XI. Accurate interactions based on the centers of charge of coarse-grained sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cao, Zhen; Voth, Gregory A., E-mail: gavoth@uchicago.edu

    It is essential to be able to systematically construct coarse-grained (CG) models that can efficiently and accurately reproduce key properties of higher-resolution models such as all-atom. To fulfill this goal, a mapping operator is needed to transform the higher-resolution configuration to a CG configuration. Certain mapping operators, however, may lose information related to the underlying electrostatic properties. In this paper, a new mapping operator based on the centers of charge of CG sites is proposed to address this issue. Four example systems are chosen to demonstrate this concept. Within the multiscale coarse-graining framework, CG models that use this mapping operatormore » are found to better reproduce the structural correlations of atomistic models. The present work also demonstrates the flexibility of the mapping operator and the robustness of the force matching method. For instance, important functional groups can be isolated and emphasized in the CG model.« less

  19. Second-order shaped pulsed for solid-state quantum computation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sengupta, Pinaki

    2008-01-01

    We present the construction and detailed analysis of highly optimized self-refocusing pulse shapes for several rotation angles. We characterize the constructed pulses by the coefficients appearing in the Magnus expansion up to second order. This allows a semianalytical analysis of the performance of the constructed shapes in sequences and composite pulses by computing the corresponding leading-order error operators. Higher orders can be analyzed with the numerical technique suggested by us previously. We illustrate the technique by analyzing several composite pulses designed to protect against pulse amplitude errors, and on decoupling sequences for potentially long chains of qubits with on-site andmore » nearest-neighbor couplings.« less

  20. First year of ALMA site software deployment: where everything comes together

    NASA Astrophysics Data System (ADS)

    González, Víctor; Mora, Matias; Araya, Rodrigo; Arredondo, Diego; Bartsch, Marcelo; Burgos, Pablo; Ibsen, Jorge; Reveco, Johnny; Sáez, Norman; Schemrl, Anton; Sepulveda, Jorge; Shen, Tzu-Chiang; Soto, Rubén; Troncoso, Nicolás; Zambrano, Mauricio; Barriga, Nicolás; Glendenning, Brian; Raffi, Gianni; Kern, Jeff

    2010-07-01

    Starting 2009, the ALMA project initiated one of its most exciting phases within construction: the first antenna from one of the vendors was delivered to the Assembly, Integration and Verification team. With this milestone and the closure of the ALMA Test Facility in New Mexico, the JAO Computing Group in Chile found itself in the front line of the project's software deployment and integration effort. Among the group's main responsibilities are the deployment, configuration and support of the observation systems, in addition to infrastructure administration, all of which needs to be done in close coordination with the development groups in Europe, North America and Japan. Software support has been the primary interaction key with the current users (mainly scientists, operators and hardware engineers), as the software is normally the most visible part of the system. During this first year of work with the production hardware, three consecutive software releases have been deployed and commissioned. Also, the first three antennas have been moved to the Array Operations Site, at 5.000 meters elevation, and the complete end-to-end system has been successfully tested. This paper shares the experience of this 15-people group as part of the construction team at the ALMA site, and working together with Computing IPT, on the achievements and problems overcomed during this period. It explores the excellent results of teamwork, and also some of the troubles that such a complex and geographically distributed project can run into. Finally, it approaches the challenges still to come, with the transition to the ALMA operations plan.

  1. Processing Technology Selection for Municipal Sewage Treatment Based on a Multi-Objective Decision Model under Uncertainty.

    PubMed

    Chen, Xudong; Xu, Zhongwen; Yao, Liming; Ma, Ning

    2018-03-05

    This study considers the two factors of environmental protection and economic benefits to address municipal sewage treatment. Based on considerations regarding the sewage treatment plant construction site, processing technology, capital investment, operation costs, water pollutant emissions, water quality and other indicators, we establish a general multi-objective decision model for optimizing municipal sewage treatment plant construction. Using the construction of a sewage treatment plant in a suburb of Chengdu as an example, this paper tests the general model of multi-objective decision-making for the sewage treatment plant construction by implementing a genetic algorithm. The results show the applicability and effectiveness of the multi-objective decision model for the sewage treatment plant. This paper provides decision and technical support for the optimization of municipal sewage treatment.

  2. Numerical study on criteria for design and operation of water curtain system in underground oil storage cavern using site descriptive fracture networks

    NASA Astrophysics Data System (ADS)

    Moon, Jiwon; Yeo, In Wook

    2013-04-01

    Underground unlined caverns have been constructed in fractured rocks to stockpile oil and petroleum products, where they are hydraulically contained by natural groundwater pressure. However, for the case that natural groundwater pressure is not maintained at the required level, water curtain boreholes, through which water is injected, are often constructed above the cavern as engineering barrier to secure water pressure enough to overwhelm the operational pressure of the cavern. For secure containment of oil and petroleum products inside the cavern, it is essential to keep water pressure around the cavern higher than operational pressure of the cavern using either natural groundwater pressure or engineering barrier. In the Republic of Korea, a number of underground stockpile bases are being operated by Korea National Oil Corporation (KNOC) and private companies, most of which have water curtain system. The criterion that KNOC adopts for water curtain system design and operation such as the vertical distance from the cavern and operational injection rate is based on the Åberg hypothesis that the vertical hydraulic gradient should be larger than one. The criterion has been used for maintaining oil storage cavern without its thorough review. In this study, systematic numerical works have been done for reviewing the Åberg criterion. As groundwater predominantly takes places through fractures in underground caverns, discrete fracture modeling approach is essential for this study. Fracture data, obtained from boreholes drilled at the stage of site investigation at the Yeosu stockpile base in Korea, were statistically analyzed in terms of orientation and intensity, which were used to generate the site descriptive three dimensional fracture networks. Then, groundwater flow modeling has been carried out for the fracture networks. Constant head boundaries were applied along the circumference of the cavern and water curtain boreholes. Main flow channel and hydraulic connectivity between water curtain boreholes and the caverns have been identified, along which hydraulic heads are monitored to find out whether the required hydraulic pressure is maintained around the cavern. The flow modeling has been repeatedly carried out at different constant head boundary conditions to create the criterion for the optimal operation of water curtain system.

  3. Cancer Research Center Indiana University School of Medicine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    The Department of Energy (DOE) proposes to authorize the Indiana School of Medicine to proceed with the detailed design, construction and equipping of the proposed Cancer Research Center (CRC). A grant was executed with the University on April 21, 1992. A four-story building with basement would be constructed on the proposed site over a 24-month period. The proposed project would bring together, in one building, three existing hematology/oncology basic research programs, with improved cost-effectiveness through the sharing of common resources. The proposed site is currently covered with asphaltic pavement and is used as a campus parking lot. The surrounding areamore » is developed campus, characterized by buildings, walkways, with minimal lawns and plantings. The proposed site has no history of prior structures and no evidence of potential sources of prior contamination of the soil. Environmental impacts of construction would be limited to minor increases in traffic, and the typical noises associated with standard building construction. The proposed CRC project operation would involve the use radionuclides and various hazardous materials in conducting clinical studies. Storage, removal and disposal of hazardous wastes would be managed under existing University programs that comply with federal and state requirements. Radiological safety programs would be governed by Nuclear Regulatory Commission (NRC) license and applicable Environmental Protection Agency (EPA) regulations. There are no other NEPA reviews currently active which are in relationship to this proposed site. The proposed project is part of a Medical Campus master plan and is consistent with applicable local zoning and land use requirements.« less

  4. 78 FR 50087 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement for the Alpine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... the majority of the infield road and pipeline route. CPAI proposes placement of fill material on 73.1..., gas, and water produced from the reservoir would be carried via pipeline to CD-1 for processing. Sales... construct, operate, and maintain a drill site, access road, pipelines, and ancillary facilities to support...

  5. 78 FR 13330 - Pangea LNG (North America) Holdings, LLC; Application for Long-Term Authorization To Export...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ..., of pipeline- quality natural gas. Pangea states that such gas will be delivered to the ST LNG Project... systems \\4\\ via the South Texas Pipeline, thereby allowing natural gas to be supplied through displacement... the siting, construction, and operation of an affiliated natural gas pipeline that will bring feed gas...

  6. 78 FR 34089 - Jordan Cove Energy Project, L.P.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... Docket No. CP13-483-000 an application under section 3 of the Natural Gas Act (NGA) and Parts 153 and 380 of the Commission's regulations, seeking authorization to site, construct and operate a natural gas liquefaction and liquefied natural gas (LNG) export facility (Liquefaction Project) on the bay side of the...

  7. 75 FR 2126 - Calais Pipeline Company, LLC; Calais LNG Project Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... 7(c) of the Natural Gas Act (NGA), respectively, as amended and Parts 153, 157, 284 and 380 of the Commission's regulations requesting: (1) Authorization to site, construct and operate a new liquefied natural... approximately 20.7 miles of 36-inch-diameter pipeline and related facilities in order to transport natural gas...

  8. "There Was Something about Aspiration": Widening Participation Policy Affects in England and Australia

    ERIC Educational Resources Information Center

    Sellar, Sam; Storan, John

    2013-01-01

    This paper discusses the emergence of aspiration as a keyword linked to higher education equity policy in England and Australia since 1997. Aspiration serves multiple purposes when constructed as a problematic site in which policy must intervene. For example, it can be understood as a vector for new technologies of governance that operate through…

  9. Exploring "Girl Power": Gender, Literacy and the Textual Practices of Young Women Attending an Elite School

    ERIC Educational Resources Information Center

    Charles, Claire

    2007-01-01

    Popular discourses concerning the relationship between gender and academic literacies have suggested that boys are lacking in particular, school-based literacy competencies compared with girls. Such discourses construct "gender" according to a binary framework and they obscure the way in which literacy and textual practices operate as a site in…

  10. 78 FR 79501 - Tennessee Valley Authority, Exemption From the Requirement To Submit an Annual Update to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ..., Maryland 20852. FOR FURTHER INFORMATION CONTACT: Anthony Minarik, Office of New Reactors, U.S. Nuclear... advanced pressurized water reactors to be constructed and operated at the Bellefonte site, located near the... 052000-15). The NRC docketed the Bellefonte Nuclear Plant, Units 3 and 4 (BLN 3&4) COL application on...

  11. 77 FR 71872 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-in Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ... the Board's Web site, http://www.stb.dot.gov , by clicking on the ``E-FILING'' link. Please refer to Docket No. FD 30186 in all correspondence, including e-filings, addressed to the Board. Scoping comments... addressed to: Ken Blodgett, Surface Transportation Board, 395 E Street SW., Washington, DC 20423-0001...

  12. 78 FR 9945 - Crow Butte Resources, Inc.; Establishment of Atomic Safety and Licensing Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... Material License, SUA-1534, to obtain authority to construct and operate an in situ uranium recovery satellite facility at its Marsland site in Dawes County, Nebraska. In response to a ``Notice of Opportunity for a Hearing'' published in the Federal Register, see 77 Fed. Reg. 71,454 (Nov. 30, 2012), hearing...

  13. Waste Handeling Building Conceptual Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G.W. Rowe

    2000-11-06

    The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable,more » and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system.« less

  14. Cairo consensus on the IVF laboratory environment and air quality: report of an expert meeting.

    PubMed

    Mortimer, D; Cohen, J; Mortimer, S T; Fawzy, M; McCulloh, D H; Morbeck, D E; Pollet-Villard, X; Mansour, R T; Brison, D R; Doshi, A; Harper, J C; Swain, J E; Gilligan, A V

    2018-03-02

    This proceedings report presents the outcomes from an international Expert Meeting to establish a consensus on the recommended technical and operational requirements for air quality within modern assisted reproduction technology (ART) laboratories. Topics considered included design and construction of the facility, as well as its heating, ventilation and air conditioning system; control of particulates, micro-organisms (bacteria, fungi and viruses) and volatile organic compounds (VOCs) within critical areas; safe cleaning practices; operational practices to optimize air quality while minimizing physicochemical risks to gametes and embryos (temperature control versus air flow); and appropriate infection-control practices that minimize exposure to VOC. More than 50 consensus points were established under the general headings of assessing site suitability, basic design criteria for new construction, and laboratory commissioning and ongoing VOC management. These consensus points should be considered as aspirational benchmarks for existing ART laboratories, and as guidelines for the construction of new ART laboratories. Copyright © 2018 The Authors. Published by Elsevier Ltd.. All rights reserved.

  15. Photographic copy of photograph, dated September 1973 (original in possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, dated September 1973 (original in possession of CSSD-HO, Huntsville, AL). Photographer unknown. Aerial view (northwest to southeast) of remote sprint launch site #4 during construction. In the background are the waste stabilization ponds. In the foreground, left to right, are the remote launch operations building, the exclusion area sentry stations, and the sprint launch cells - Stanley R. Mickelsen Safeguard Complex, Remote Sprint Launch Site No. 4, North of State Highway 17, approximately 9 miles Northwest of Adams, ND, Nekoma, Cavalier County, ND

  16. A Fourier transform spectrometer for site testing at Dome A

    NASA Astrophysics Data System (ADS)

    Li, Xin-Xing; Paine, Scott; Yao, Qi-Jun; Shi, Sheng-Cai; Matsuo, Hiroshi; Yang, Ji; Zhang, Qi-Zhou

    2009-07-01

    Observations in tera-hertz astronomy can only be done at a site with good atmospheric transmission at millimeter and submillimeter wavelengths. With extremely dry weather and calm atmosphere resulted by high altitude and cold temperature, Dome A (or Dome Argus), Antarctica, is possibly the best site on this earth for THz astronomy. To evaluate the site condition there, we are constructing a Fourier Transform Spectrometer (FTS) based on Martin-Puplett interferometer to measure the atmospheric transmission in the frequency range of 0.75~15THz. The whole FTS system is designed for unattended and outdoor (temperatures even below -70 degrees Celsius) operation. Its total power consumption is estimated to be approximately 200W. This contribution will give a brief overview of this FTS development.

  17. Non-Thermal Treatment of Hanford Site Low-Level Mixed Waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-09-01

    DOE proposes to transport contact-handled LLMW from the Hanford Site to the Allied Technology Group (ATG) Mixed Waste Facility (MWF) in Richland, Washington, for non-thermal treatment and to return the treated waste to the Hanford Site for eventual land disposal. Over a 3-year period the waste would be staged to the ATG MWF, and treated waste would be returned to the Hanford Site. The ATG MWF would be located on an 18 hectare (ha) (45 acre [at]) ATG Site adjacent to ATG's licensed low-level waste processing facility at 2025 Battelle Boulevard. The ATG MWF is located approximately 0.8 kilometers (km)more » (0.5 miles [mi]) south of Horn Rapids Road and 1.6 km (1 mi) west of Stevens Drive. The property is located within the Horn Rapids triangle in northern Richland (Figure 2.1). The ATG MWF is to be located on the existing ATG Site, near the DOE Hanford Site, in an industrial area in the City of Richland. The effects of siting, construction, and overall operation of the MWF have been evaluated in a separate State Environmental Policy Act (SEPA) EIS (City of Richland 1998). The proposed action includes transporting the LLMW from the Hanford Site to the ATG Facility, non-thermal treatment of the LLMW at the ATG MWF, and transporting the waste from ATG back to the Hanford Site. Impacts fi-om waste treatment operations would be bounded by the ATG SEPA EIS, which included an evaluation of the impacts associated with operating the non-thermal portion of the MWF at maximum design capacity (8,500 metric tons per year) (City of Richland 1998). Up to 50 employees would be required for non-thermal treatment portion of the MWF. This includes 40 employees that would perform waste treatment operations and 10 support staff. Similar numbers were projected for the thermal treatment portion of the MWF (City of Richland 1998).« less

  18. Topic I: Induced changes in hydrology at low-level radioactive waste repository sites: A section in Safe disposal of radionuclides in low-level radioactive-waste repository sites; Low-level radioactive-waste disposal workshop, U.S. Geological Survey, July 11-16, 1987, Big Bear Lake, Calif., Proceedings (Circular 1036)

    USGS Publications Warehouse

    Prudic, David E.; Dennehy, Kevin F.; Bedinger, Marion S.; Stevens, Peter R.

    1990-01-01

    Engineering practices, including the excavation of trenches, placement of waste, nature of waste forms, backfilling procedures and materials, and trench-cover construction and materials at low-level radioactive-waste repository sites greatly affect the geohydrology of the sites. Engineering practices are dominant factors in eventual stability and isolation of the waste. The papers presented relating to Topic I were discussions of the hydrogeologic setting at existing low-level radioactive-waste repository sites and changes in the hydrology induced by site operations. Papers summarizing detailed studies presented at this workshop include those at sites near Sheffield, Ill.; Oak Ridge National Laboratory, Tenn.; West Valley, N.Y.; Maxey Flats, Ky.; Barnwell, S.C.; and Beatty, Nev. 

  19. Regulatory requirements for nuclear power plant site selection in Malaysia-a review.

    PubMed

    Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K

    2016-12-01

    Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.

  20. Architects' perspectives on construction waste reduction by design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-07-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previousmore » studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.« less

  1. Architects' perspectives on construction waste reduction by design.

    PubMed

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  2. Three-Dimensional Laser Scanning for Geometry Documentation and Construction Management of Highway Tunnels during Excavation

    PubMed Central

    Gikas, Vassilis

    2012-01-01

    Driven by progress in sensor technology, computer software and data processing capabilities, terrestrial laser scanning has recently proved a revolutionary technique for high accuracy, 3D mapping and documentation of physical scenarios and man-made structures. Particularly, this is of great importance in the underground space and tunnel construction environment as surveying engineering operations have a great impact on both technical and economic aspects of a project. This paper discusses the use and explores the potential of laser scanning technology to accurately track excavation and construction activities of highway tunnels. It provides a detailed overview of the static laser scanning method, its principles of operation and applications for tunnel construction operations. Also, it discusses the planning, execution, data processing and analysis phases of laser scanning activities, with emphasis given on geo-referencing, mesh model generation and cross-section extraction. Specific case studies are considered based on two construction sites in Greece. Particularly, the potential of the method is examined for checking the tunnel profile, producing volume computations and validating the smoothness/thickness of shotcrete layers at an excavation stage and during the completion of excavation support and primary lining. An additional example of the use of the method in the geometric documentation of the concrete lining formwork is examined and comparisons against dimensional tolerances are examined. Experimental comparisons and analyses of the laser scanning method against conventional surveying techniques are also considered. PMID:23112655

  3. Development of high-rise buildings: digitalization of life cycle management

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  4. Design of an autonomous Lunar construction utility vehicle

    NASA Technical Reports Server (NTRS)

    Ash, Robert L.; Chew, Mason; Dixon, Iain (Editor)

    1990-01-01

    In order to prepare a site for a manned lunar base, an autonomously operated construction vehicle is necessary. A Lunar Construction Utility Vehicle (LCUV), which utilizes interchangeable construction implements, was designed conceptually. Some elements of the machine were studied in greater detail. Design of an elastic loop track system has advanced to the testing stage. A standard coupling device was designed to insure a proper connection between the different construction tools and the LCUV. Autonomous control of the track drive motors was simulated successfully through the use of a joystick and computer interface. A study of hydrogen-oxygen fuel cells has produced estimates of reactant and product size requirements and identified multi-layer insulation techniques. Research on a 100 kW heat rejection system has determined that it is necessary to house a radiator panel on a utility trailer. The impact of a 720 hr use cycle has produced a very large logistical support lien which requires further study.

  5. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    NASA Astrophysics Data System (ADS)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  6. Superfund Record of Decision (EPA Region 7): Doepke Disposal (Holliday), KS. (First remedial action), September 1989. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-09-21

    The Doepke Disposal (Holliday) site is an inactive industrial-waste landfill located east of Holliday, Johnson County, Kansas. During the 1950s and early 1960s the site was used as a landfill for residential refuse. In 1963 Doepke Disposal Service, Inc. leased the property and operated a commercial and industrial waste landfill until 1970, when the State shut down the operation. Materials such as fiberglass, fiberglass resins, paint sludges, spent solvents, metal sludges, soaps, and pesticides were reportedly disposed of at the landfill. In 1966 fire debris and up to 374 drums of solvents and organochlorine and organophosphate pesticides were disposed ofmore » at the site as a result of a fire at a Kansas City chemical plant. Initially wastes and residues brought to the site were burned, however, in the late 1960s burning operations ceased and solid wastes were buried onsite and liquids were disposed of in two surface impoundments. In 1977 rock material excavated during the construction of an interstate was dumped onsite and in some cases over the deposited waste. The current owner uses portions of the site for storage of clay, crushed shales, and crushed limestone. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, toluene, and xylene; other organics including PAHs, PCBs, and pesticides, and metals including chromium and lead.« less

  7. Construction continues on the RLV complex at the Shuttle Landing Facility

    NASA Technical Reports Server (NTRS)

    1999-01-01

    At the construction site of the Reusable Launch Vehicle (RLV) complex at KSC, workers take measurements for one of the buildings. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.

  8. A-3 Test Stand construction

    NASA Image and Video Library

    2010-10-01

    An 80,000-gallon liquid hydrogen tank is placed at the A-3 Test Stand construction site on Sept. 24, 2010. The tank will provide propellant for tests of next-generation rocket engines at the stand. It will be placed upright on top of the stand, helping to increase the overall height to 300 feet. Once completed, the A-3 Test Stand will enable operators to test rocket engines at simulated altitudes of up to 100,000 feet. The A-3 stand is the first large rocket engine test structure to be built at Stennis Space Center since the 1960s.

  9. A-3 Test Stand construction

    NASA Image and Video Library

    2010-09-24

    A 35,000-gallon liquid oxygen tank is placed at the A-3 Test Stand construction site on Sept. 24, 2010. The tank will provide propellant for tests of next-generation rocket engines at the stand. It will be placed upright on top of the stand, helping to increase the overall height to 300 feet. Once completed, the A-3 Test Stand will enable operators to test rocket engines at simulated altitudes of up to 100,000 feet. The A-3 stand is the first large rocket engine test structure to be built at Stennis Space Center since the 1960s.

  10. Construction continues on the RLV complex at the Shuttle Landing Facility

    NASA Technical Reports Server (NTRS)

    1999-01-01

    At the construction site of the Reusable Launch Vehicle (RLV) complex at KSC, a worker takes a measurement. Located near the Shuttle Landing Facility, the complex will include facilities for related ground support equipment and administrative/ technical support. It will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000.

  11. KSC-99pp1259

    NASA Image and Video Library

    1999-10-29

    Work continues on construction of the multi-purpose hangar at the site of the $8 million Reusable Launch Vehicle (RLV) Support Complex at Kennedy Space Center. In the background can be seen the new construction for the building that will house related ground support equipment and administrative/technical support. The RLV complex will be available to accommodate the Space Shuttle; the X-34 RLV technology demonstrator; the L-1011 carrier aircraft for Pegasus and X-34; and other RLV and X-vehicle programs. The complex is jointly funded by the Spaceport Florida Authority, NASA's Space Shuttle Program and KSC. The facility will be operational in early 2000

  12. A Study of Community Leaders in a Nuclear Host Community: Local Issues, Expectations and Support and Opposition.

    ERIC Educational Resources Information Center

    Bronfman, B. H.

    As part of a continuing effort to assess the social impacts on communities of energy facility planning, construction, operation, and decommissioning, a May 1977 survey of 37 community leaders in Hartsville, Tennessee (site of a nuclear power plant) establishes major local issues (past, present, and future) which leaders feel are important to…

  13. 10 CFR 72.98 - Identifying regions around an ISFSI or MRS site.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... regional extent of external phenomena, man-made or natural, that are used as a basis for the design of the ISFSI or MRS must be identified. (b) The potential regional impact due to the construction, operation or decommissioning of the ISFSI or MRS must be identified. The extent of regional impacts must be determined on the...

  14. 10 CFR 72.98 - Identifying regions around an ISFSI or MRS site.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... regional extent of external phenomena, man-made or natural, that are used as a basis for the design of the ISFSI or MRS must be identified. (b) The potential regional impact due to the construction, operation or decommissioning of the ISFSI or MRS must be identified. The extent of regional impacts must be determined on the...

  15. 10 CFR 72.98 - Identifying regions around an ISFSI or MRS site.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... regional extent of external phenomena, man-made or natural, that are used as a basis for the design of the ISFSI or MRS must be identified. (b) The potential regional impact due to the construction, operation or decommissioning of the ISFSI or MRS must be identified. The extent of regional impacts must be determined on the...

  16. 78 FR 1936 - Tongue River Railroad Company, Inc.-Rail Construction and Operation-In Custer, Powder River and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... the proposed line is to transport low sulfur sub-bituminous coal from mine sites in the Otter Creek... October 16, 2012, but modified the project in a December 17, 2012 supplemental application that supersedes... River and Rosebud Cntys., Mont. (Tongue River I), FD 30186 (ICC served Sept. 4, 1985), modified (ICC...

  17. Environmental Assessment: Construction and Operation of Headquarters Air Force Reserve Command Campus

    DTIC Science & Technology

    2010-01-21

    Headquarters AFRC Campus 2 January 21, 2010 ( pest /vegetation control and oil spill dispersal) using...activities is generated at the Proposed Action Site. This solid waste includes kitchen waste, paper, plastics, metal and glass containers, and standard...includes kitchen waste, paper, plastics, metal and glass containers, and standard housekeeping materials, and is handled in accordance with Robins

  18. Turbidity changes during culvert to bridge upgrades at Carmen Creek, Idaho

    Treesearch

    Randy B. Foltz; Breann Westfall; Ben Kopyscianski

    2012-01-01

    Carmen Creek, a tributary to the Salmon River in Idaho, was the site of two culvert to bridge upgrade operations in September and October 2011. Both locations were upgraded from multiple, large diameter culverts to bridge crossings. Turbidity readings measured at the end of the mixing zone during the nearly three weeks of upgrade construction activities did not exceed...

  19. Retaining Low-Income Residents in the Workforce: Lessons from the Annie E. Casey Jobs Initiative.

    ERIC Educational Resources Information Center

    Giloth, Bob; Gewirtz, Susan

    Annie E. Casey Jobs Initiative sites recognize the challenge that long-term retention poses in today's labor market for low-income residents. They have developed key elements of an operational definition of retention, including the following: no limitation to one job, but only very limited gaps between jobs; and jobs in construction or other…

  20. 10 CFR 36.15 - Start of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements § 36.15 Start of construction. The applicant may not begin construction of a new irradiator prior... work, purchase of a site, site surveys or soil testing, site preparation, site excavation, construction... license with respect to the requirements of the Atomic Energy Act of 1954, as amended, and rules...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Iyer, Sukanya; Karig, David K; Norred, Sarah E

    Engineered gene circuits offer an opportunity to harness biological systems for biotechnological and biomedical applications. However, reliance on host E. coli promoters for the construction of circuit elements, such as logic gates, makes implementation of predictable, independently functioning circuits difficult. In contrast, T7 promoters offer a simple orthogonal expression system for use in a variety of cellular backgrounds and even in cell free systems. Here we develop a T7 promoter system that can be regulated by two different transcriptional repressors for the construction of a logic gate that functions in cells and in cell free systems. We first present LacImore » repressible T7lacO promoters that are regulated from a distal lac operator site for repression. We next explore the positioning of a tet operator site within the T7lacO framework to create T7 promoters that respond to tet and lac repressors and realize an IMPLIES gate. Finally, we demonstrate that these dual input sensitive promoters function in a commercially available E. coli cell-free protein expression system. Together, our results contribute to the first demonstration of multi-input regulation of T7 promoters and expand the utility of T7 promoters in cell based as well as cell-free gene circuits.« less

  2. Fly ash carbon burn-out at TVA`s Colbert and Shawnee Stations: Site specific application study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cochran, J.W.; Kirkconnell, S.F.

    1996-04-01

    Many power plants, particularly after conversion to low-NOx burners, produce fly ash that is too high in carbon content to be successfully marketed as a concrete admixture. Fly ash beneficiation using Carbon Burn-Out (CBO) technology offers the opportunity to market fly ash that was previously landfilled. This site application study of beneficiating pulverized coal boiler fly ash at Tennessee Valley Authority`s Colbert and Shawnee Stations indicates this process is a cost effective solution for decreasing solid waste disposal, increasing landfill life, improving boiler heat rate, and generating a positive revenue stream. Results indicate that the Colbert Station has the flymore » ash market, site integration potential, and positive economics to support construction and operation of a CBO plant with an annual production rate of approximately 150,000 tons. As the market for fly ash increases, this capacity may be expanded to handle the majority of fly ash generated at Colbert. Results of the Shawnee Station analysis indicate that site integration constraints combined with the lack of near term local area fly ash market growth do not support construction and operation of a CBO plant. CBO commercial process design work in developing a generic commercial design resulted in a major improvement to the heat recovery portion of the process. This development resulted in the elimination of five major equipment items, with a corresponding reduction in plant complexity and costs. The design change is now considered part of the commercial offering.« less

  3. Rectenna related atmospheric effects

    NASA Technical Reports Server (NTRS)

    Lee, J.

    1980-01-01

    Possible meteorological effects arising from the existence and operations of a solar power satellite (SPS) system rectenna are examined. Analysis and model simulations in some chosen site situations and meteorological conditions indicate that the meteorological effects of the construction and operation of a rectenna are small, particularly outside the boundary of the structure. From weather and climate points of view, installation of an SPS rectenna seems likely to have effects comparable with those due to other nonindustrial land use changes covering the same area. The absorption and scattering of microwave radiation in the troposphere would have negligible atmospheric effects.

  4. Hydro power plants on the Middle Sava River section

    NASA Astrophysics Data System (ADS)

    Kryžanowski, A.; Horvat, A.; Brilly, M.

    2008-11-01

    Construction of a chain of hydro power plants is planned on the Sava River from Medvode to the Slovenian-Croatian border which will, apart from the chain of HPPs on the Drava River, represent the linchpin of renewable energy production within the Slovenian power system. The mentioned chain of HPPs will also be one of the country's main renewable energy sources that can still be developed for power generation. Three hydro power plants, Moste, Mavčciče and Medvode, are already operating on the Upper Sava River section. Construction of the chain is underway in the lower part of the stream where Vrhovo and Bošstanj HPPs are already in operation; HPP Blanca is under construction and the site planning procedures are taking place for Krško, Brežice and Mokrice HPPs. The planned HPPs on the Middle Sava River section between Medvode and Zidani most will connect the HPPs on the Upper and Lower Sava River into a closed chain which will operate on the principle of run-of-river type power plants with daily storage. Completion of all stages will enable optimal development of available hydro potential. Apart from the energy effects, also other beneficial effects of hydro power plant construction in the region can be expected: flood protection; better water supply; waste water treatment; development of transport and energy networks as well as positive economic and social effects.

  5. The evolution of a purpose designed hybrid trauma operating room from the trauma service perspective: the RAPTOR (Resuscitation with Angiography Percutaneous Treatments and Operative Resuscitations).

    PubMed

    Kirkpatrick, Andrew W; Vis, Christine; Dubé, Mirette; Biesbroek, Susan; Ball, Chad G; Laberge, Jason; Shultz, Jonas; Rea, Ken; Sadler, David; Holcomb, John B; Kortbeek, John

    2014-09-01

    Traumatic injury is the leading cause of potentially preventable lost years of life in the Western world and exsanguination is the most potentially preventable cause of post-traumatic death. With mature trauma systems and experienced trauma centres, extra-abdominal sites, such as the pelvis, constitute the most frequent anatomic site of exsanguination. Haemorrhage control for such bleeding often requires surgical adjuncts most notably interventional radiology (IR). With the usual paradigm of surgery conducted within an operating room and IR procedures within distant angiography suites, responsible clinicians are faced with making difficult decisions regarding where to transport the most physiologically unstable patients for haemorrhage control. If such a critical patient is transported to the wrong suite, they may die unnecessarily despite having potentially salvageable injuries. Thus, it seems only logical that the resuscitative operating room of the future would have IR capabilities making it the obvious geographic destination for critically unstable patients, especially those who are exsanguinating. Our trauma programme recently had the opportunity to conceive, design, build, and operationalise a purpose-designed hybrid trauma operating room, designated as the resuscitation with angiographic percutaneous techniques and operative resuscitation (RAPTOR) suite, which we believe to be the first such resource designed primarily to serve the exsanguinating trauma patient. The project was initiated after consultations between the trauma programme and private philanthropists regarding the greatest potential impacts on regional trauma care. The initial capital construction costs were thus privately generated but coincided with a new hospital wing construction allowing the RAPTOR to be purpose-designed for the exsanguinating patient. Many trauma programmes around the world are now starting to navigate the complex process of building new facilities, or else retrofitting existing ones, to address the need for single-site flexible haemorrhage control. This manuscript therefore describes the many considerations in the design and refinement of the physical build, equipment selection, human factors evaluation of new combined treatment paradigms, and the final introduction of a RAPTOR protocol in order that others may learn from our initial efforts. Copyright © 2014 Elsevier Ltd. All rights reserved.

  6. SNL/CA Facilities Management Design Standards Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rabb, David; Clark, Eva

    2014-12-01

    At Sandia National Laboratories in California (SNL/CA), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/CA applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safetymore » and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule.« less

  7. Soundscape and Noise Exposure Monitoring in a Marine Protected Area Using Shipping Data and Time-Lapse Footage.

    PubMed

    Merchant, Nathan D; Pirotta, Enrico; Barton, Tim R; Thompson, Paul M

    2016-01-01

    We review recent work that developed new techniques for underwater noise assessment that integrate acoustic monitoring with automatic identification system (AIS) shipping data and time-lapse video, meteorological, and tidal data. Two sites were studied within the Moray Firth Special Area of Conservation (SAC) for bottlenose dolphins, where increased shipping traffic is expected from construction of offshore wind farms outside the SAC. Noise exposure varied markedly between the sites, and natural and anthropogenic contributions were characterized using multiple data sources. At one site, AIS-operating vessels accounted for total cumulative sound exposure (0.1-10 kHz), suggesting that noise modeling using the AIS would be feasible.

  8. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. Tammy Kelly, in the center, site manager, with Southeast Cherokee Construction Inc. talks with construction workers. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  9. Managing the nation`s nuclear waste. Site descriptions: Cypress Creek, Davis Canyon, Deaf Smith, Hanford Reference, Lavender Canyon, Richton Dome, Swisher, Vacherie Dome, and Yucca Mountain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1985-12-31

    In 1982, the Congress enacted the Nuclear Waste Policy Act (Public Law 97-425), which established a comprehensive national program directed toward siting, constructing, and operating geologic repositories for the permanent disposal of high-level radioactive waste. In February 1983, the United States Department of Energy (DOE) identified the nine referenced repository locations as potentially acceptable sites for a mined geologic repository. These sites have been evaluated in accordance with the DOE`s General Guidelines for the Recommendation of Sites for Nuclear Waste Repositories. The DOE findings and determinations are based on the evaluations contained in the draft Environmental Assessments (EA). A finalmore » EA will be prepared after considering the comments received on the draft EA. The purpose of this document is to provide the public with specific site information on each potential repository location.« less

  10. Trauma caused by falling objects at construction sites.

    PubMed

    Atique, Sajid; Zarour, Ahmad; Siddiqui, Tariq; El-Menyar, Ayman; Maull, Kimball; Al Thani, Hassan; Latifi, Rifat

    2012-09-01

    Workplace-related injuries carry a significant health care challenge. The state of Qatar is developing rapidly, with much construction and an expanding industrial work force. This study aimed to assess the incidence and social impact of work-related injuries requiring hospitalization caused by falling objects at the construction sites. We performed a prospective study for all admissions, which resulted from falling objects between January 2008 and June 2010 at the only trauma center in the state of Qatar. Data were analyzed, and outcomes were described (mortality, length of hospital stay, and safety measures). Of the total injured patients (N = 4,302) admitted between January 2008 and June 2010, 185 (4%) had injuries caused purely by falling objects. Patients' mean age was 29 years, and 97% of the patients were men. All injuries occurred at construction sites. Most patients (86%) were brought by ambulance, and the reminder was brought by private vehicles. After initial evaluation and resuscitation, 120 patients (65%) were found to have a single-system injury, and 65 (35%) had multisystem injury. Operative interventions were required in 50% of the patients. Mean length of hospital stay varied from 6.5 days for single-system injuries to 19 days for multisystem injuries. Safety devices were used in 32 patients (17.3%). All of the 16 mortality cases (8.6%) were reported in multiple injuries. Traumatic injury caused by falling object represents a significant problem in a rapidly developing country. Many of these injuries could be prevented by following established safety guidelines. Epidemiologic study, level III.

  11. From Tuscaloosa to Squaw Shoals: a history of Holt Lake, Alabama

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, K.G.

    1988-07-15

    An archival study was performed for Corps of Engineers land at Holt Lake, located north of Tuscaloosa, Alabama, on the Black Warrior River. The project area lies at the southern terminus of the Warrior Coal Fields, which are dissected by the Black Warrior River. Much coal-mining activity has taken place in the area historically. But coal mining did not increase significantly until the early twentieth century when the building of several railroad lines into the area facilitated coal operations. The construction of locks on the Black Warrior River north of Tuscaloosa in the early twentieth century allowed year-round traffic onmore » the Black Warrior River which added extra impetus to the coal mining industry. Three lock sites, portions of a railroad complex (including the road grade, a tunnel, and trestle piers), a probable twentieth century house site, a small cemetery, a historic artifact scatter, and two aboriginal sites were identified during a survey of the area. The lock sites and the railroad complex do not appear to be eligible for nomination to the National Register of Historic Places because a great portion of them have been destroyed or submerged by the construction of Holt Lock and Dam.« less

  12. Lessons Learned from Radioactive Waste Storage and Disposal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esh, David W.; Bradford, Anna H.

    2008-01-15

    The safety of radioactive waste disposal facilities and the decommissioning of complex sites may be predicated on the performance of engineered and natural barriers. For assessing the safety of a waste disposal facility or a decommissioned site, a performance assessment or similar analysis is often completed. The analysis is typically based on a site conceptual model that is developed from site characterization information, observations, and, in many cases, expert judgment. Because waste disposal facilities are sited, constructed, monitored, and maintained, a fair amount of data has been generated at a variety of sites in a variety of natural systems. Thismore » paper provides select examples of lessons learned from the observations developed from the monitoring of various radioactive waste facilities (storage and disposal), and discusses the implications for modeling of future waste disposal facilities that are yet to be constructed or for the development of dose assessments for the release of decommissioning sites. Monitoring has been and continues to be performed at a variety of different facilities for the disposal of radioactive waste. These include facilities for the disposal of commercial low-level waste (LLW), reprocessing wastes, and uranium mill tailings. Many of the lessons learned and problems encountered provide a unique opportunity to improve future designs of waste disposal facilities, to improve dose modeling for decommissioning sites, and to be proactive in identifying future problems. Typically, an initial conceptual model was developed and the siting and design of the disposal facility was based on the conceptual model. After facility construction and operation, monitoring data was collected and evaluated. In many cases the monitoring data did not comport with the original site conceptual model, leading to additional investigation and changes to the site conceptual model and modifications to the design of the facility. The following cases are discussed: commercial LLW disposal facilities; uranium mill tailings disposal facilities; and reprocessing waste storage and disposal facilities. The observations developed from the monitoring and maintenance of waste disposal and storage facilities provide valuable lessons learned for the design and modeling of future waste disposal facilities and the decommissioning of complex sites.« less

  13. Incorporating Alternative Care Site Characteristics Into Estimates of Substitutable ED Visits.

    PubMed

    Trueger, Nathan Seth; Chua, Kao-Ping; Hussain, Aamir; Liferidge, Aisha T; Pitts, Stephen R; Pines, Jesse M

    2017-07-01

    Several recent efforts to improve health care value have focused on reducing emergency department (ED) visits that potentially could be treated in alternative care sites (ie, primary care offices, retail clinics, and urgent care centers). Estimates of the number of these visits may depend on assumptions regarding the operating hours and functional capabilities of alternative care sites. However, methods to account for the variability in these characteristics have not been developed. To develop methods to incorporate the variability in alternative care site characteristics into estimates of ED visit "substitutability." Our approach uses the range of hours and capabilities among alternative care sites to estimate lower and upper bounds of ED visit substitutability. We constructed "basic" and "extended" criteria that captured the plausible degree of variation in each site's hours and capabilities. To illustrate our approach, we analyzed data from 22,697 ED visits by adults in the 2011 National Hospital Ambulatory Medical Care Survey, defining a visit as substitutable if it was treat-and-release and met both the operating hours and functional capabilities criteria. Use of the combined basic hours/basic capabilities criteria and extended hours/extended capabilities generated lower and upper bounds of estimates. Our criteria classified 5.5%-27.1%, 7.6%-20.4%, and 10.6%-46.0% of visits as substitutable in primary care offices, retail clinics, and urgent care centers, respectively. Alternative care sites vary widely in operating hours and functional capabilities. Methods such as ours may help incorporate this variability into estimates of ED visit substitutability.

  14. ML Construction Progress

    NASA Image and Video Library

    2014-11-17

    Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. The haunch, a structure that will support the launch vehicle on the ML, arrives by flatbed truck at the park site. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first uncrewed mission, Exploration Mission-1, in 2018.

  15. ML Construction Progress

    NASA Image and Video Library

    2014-11-17

    A water moccasin snake travels across the gravel surface near the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. Nearby, the haunch, a structure that will support the launch vehicle on the ML, arrives by flatbed truck at the park site. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first uncrewed mission, Exploration Mission-1, in 2018.

  16. First results from the NEMO Test Site

    NASA Astrophysics Data System (ADS)

    Riccobene, Giorgio; NEMO Collaboration

    2007-03-01

    The NEMO (NEutrino Mediterranean Observatory) Collaboration is constructing, 25 km E from Catania (Sicily) at 2000 m depth, an underwater test site to perform long-term tests of prototypes and new technologies for an underwater high energy neutrino detector in the Mediterranean Sea. In this framework the collaboration deployed and operated an experimental apparatus for on-line monitoring of deep-sea noise. The station is equipped with 4 hydrophones operational in the range 30 Hz - 40 kHz. This interval of frequencies matches the range suitable for acoustic detection of high energy neutrino-induced showers in water. Hydrophone signals are digitized underwater at 96 kHz sampling frequency and 24 bits resolution. A custom software was developed to record data on high resolution 4-channels PCM .le. Data are used to model underwater acoustic noise as a function of frequency and time, a mandatory parametre for future acoustic neutrino detectors. Results indicate that the average noise in the site is compatible with noise produced in condition of sea surface agitation (sea state.)

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Western Area Power Administration (Western) has established a formal environmental protection, auditing, monitoring, and planning program that has been in effect since 1978. The significant environmental projects and issues Western was involved with in 1995 are discussed in this annual site environmental report. It is written to show the nature and effectiveness of the environmental protection program. Western operates and maintains nearly 17,000 miles of transmission lines, 257 substations, and various appurtenant power facilities in fifteen central and western states. Western is also responsible for planning, construction, and operation and maintenance of additional federal transmission facilities that may bemore » authorized in the future. There is a combined total of 55 hydroelectric power generating plants in the service area. Additionally, Western markets the US entitlement from the Navajo coal-fired plant near Page, Arizona. The Department of Energy requires the preparation of an annual site environmental report. Because Western has over 400 facilities located in these states, this report addresses the environmental activities in all the facilities as one site.« less

  18. Study of the impacts of regulations affecting the acceptance of Integrated Community Energy Systems: public utility, energy facility siting and municipal franchising regulatory programs in Arizona. Preliminary background report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.

    1980-01-01

    This report is one of a series of preliminary reports describing the laws and regulatory programs of the United States and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. This report describes laws and regulatory programs in Arizona. The Arizona state constitution establishes themore » Arizona Corporation Commission to regulate public service corporations. Within the area of its jurisdiction, the Commission has exclusive power and may not be interfered with by the legislature except in one narrow instance as described in the case Corporation Commission v. Pacific Greyhound Lines.« less

  19. Automation of a Versatile Crane (the LSMS) for Lunar Outpost Construction, Maintenance and Inspection

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; Roithmayr, Carlos M.; Dorsey, John T.; Jones, Thomas C.; Shen, Haijun; Seywald, Hans; King, Bruce D.; Mikulas, Martin M., Jr.

    2009-01-01

    Devices for lifting, translating and precisely placing payloads are critical for efficient Earth-based construction operations. Both recent and past studies have demonstrated that devices with similar functionality will be needed to support lunar outpost operations. Although several designs have been developed for Earth based applications, these devices lack unique design characteristics necessary for transport to and use on the harsh lunar surface. These design characteristics include: a) lightweight components, b) compact packaging for launch, c) automated deployment, d) simple in-field reconfiguration and repair, and e) support for tele-operated or automated operations. Also, because the cost to transport mass to the lunar surface is very high, the number of devices that can be dedicated to surface operations will be limited. Thus, in contrast to Earth-based construction, where many single-purpose devices dominate a construction site, a lunar outpost will require a limited number of versatile devices that provide operational benefit from initial construction through sustained operations. The first generation test-bed of a new high performance device, the Lunar Surface Manipulation System (LSMS) has been designed, built and field tested. The LSMS has many unique features resulting in a mass efficient solution to payload handling on the lunar surface. Typically, the LSMS device mass is estimated at approximately 3% of the mass of the heaviest payload lifted at the tip, or 1.8 % of the mass of the heaviest mass lifted at the elbow or mid-span of the boom for a high performance variant incorporating advanced structural components. Initial operational capabilities of the LSMS were successfully demonstrated during field tests at Moses Lake, Washington using a tele-operated approach. Joint angle sensors have been developed for the LSMS to improve operator situational awareness. These same sensors provide the necessary information to support fully automated operations, greatly expanding the operational versatility of the LSMS. This paper develops the equations describing the forward and inverse relation between LSMS joint angles and Cartesian coordinates of the LSMS tip. These equations allow a variety of schemes to be used to maneuver the LSMS to optimize the maneuver. One such scheme will be described in detail that eliminates undesirable swinging of the payload at the conclusion of a maneuver, even when the payload is suspended from a passive rigid link. The swinging is undesirable when performing precision maneuvers, such as aligning an object for mating or positioning a camera. Use of the equations described here enables automated control of the LSMS greatly improving its operational versatility.

  20. Lessons Learned about Liquid Metal Reactors from FFTF Experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wootan, David W.; Casella, Andrew M.; Omberg, Ronald P.

    2016-09-20

    The Fast Flux Test Facility (FFTF) is the most recent liquid-metal reactor (LMR) to operate in the United States, from 1982 to 1992. FFTF is located on the DOE Hanford Site near Richland, Washington. The 400-MWt sodium-cooled, low-pressure, high-temperature, fast-neutron flux, nuclear fission test reactor was designed specifically to irradiate Liquid Metal Fast Breeder Reactor (LMFBR) fuel and components in prototypical temperature and flux conditions. FFTF played a key role in LMFBR development and testing activities. The reactor provided extensive capability for in-core irradiation testing, including eight core positions that could be used with independent instrumentation for the test specimens.more » In addition to irradiation testing capabilities, FFTF provided long-term testing and evaluation of plant components and systems for LMFBRs. The FFTF was highly successful and demonstrated outstanding performance during its nearly 10 years of operation. The technology employed in designing and constructing this reactor, as well as information obtained from tests conducted during its operation, can significantly influence the development of new advanced reactor designs in the areas of plant system and component design, component fabrication, fuel design and performance, prototype testing, site construction, and reactor operations. The FFTF complex included the reactor, as well as equipment and structures for heat removal, containment, core component handling and examination, instrumentation and control, and for supplying utilities and other essential services. The FFTF Plant was designed using a “system” concept. All drawings, specifications and other engineering documentation were organized by these systems. Efforts have been made to preserve important lessons learned during the nearly 10 years of reactor operation. A brief summary of Lessons Learned in the following areas will be discussed: Acceptance and Startup Testing of FFTF FFTF Cycle Reports« less

  1. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less

  2. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  3. New PBO GPS Station Construction: Eastern Region Network Enhancements and Multiple-Monument Stability Comparisons

    NASA Astrophysics Data System (ADS)

    Dittmann, S. T.; Austin, K. E.; Berglund, H. T.; Blume, F.; Feaux, K.; Mann, D.; Mattioli, G. S.; Walls, C. P.

    2013-12-01

    The Plate Boundary Observatory (PBO) network consists of 1100 continuously operating, permanent GPS stations throughout the United States. The majority of this network was constructed using NSF-MREFC funding as part of the EarthScope Project during FY2003-FY2008. Since FY2009, UNAVCO has operated and maintained PBO through a Cooperative Agreement (CA) with NSF. Construction of new, permanent GPS monuments in the PBO network was the result of two change orders to the original PBO O&M CA. Change Order 33 (CO33) allocated funds to construct additional GPS stations at six locations in the Eastern Region of PBO. Three of these locations were designed to replace poorly performing existing GPS monuments in Georgia, Texas and New York. The remaining three new locations were selected to fill in gaps in network coverage in Pennsylvania, Wisconsin and North Dakota. Construction of all six new sites was completed in September 2013. Important scientific goals for CO33 include improvement of the stable North American reference frame, measurement of the vertical signal associated with the Glacial Isostatic Adjustment, and improved constraints on surface deformation and possible earthquakes, which occur in the low-strain tectonic setting of the eastern North American Plate. Change Order 35 (CO35) allocated funds to construct two additional geodetic monuments at five existing PBO stations in order to test and compare the long-term stability of various monument designs under near-identical geologic conditions. Sites were chosen to yield a variety of geographic, hydrologic and geologic conditions, including both fine-grained alluvium and crystalline bedrock. At each location, three different monuments (deep drill braced, short drill braced/driven-braced, mast/pillar) were built with 10 meter spacing, with shared power systems and data telemetry infrastructure. Construction of these multi-monument test locations began in October 2012 and finished in September 2013. See G010- Berglund, H., Blume, F., et al... 'PBO Monument Stability Experiment Analysis' for the initial results of the data quality comparison from these locations.

  4. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, G.C.

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less

  6. Environmental analysis for pipeline gas demonstration plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stinton, L.H.

    1978-09-01

    The Department of Energy (DOE) has implemented programs for encouraging the development and commercialization of coal-related technologies, which include coal gasification demonstration-scale activities. In support of commercialization activities the Environmental Analysis for Pipeline Gas Demonstration Plants has been prepared as a reference document to be used in evaluating potential environmental and socioeconomic effects from construction and operation of site- and process-specific projects. Effluents and associated impacts are identified for six coal gasification processes at three contrasting settings. In general, impacts from construction of a high-Btu gas demonstration plant are similar to those caused by the construction of any chemical plantmore » of similar size. The operation of a high-Btu gas demonstration plant, however, has several unique aspects that differentiate it from other chemical plants. Offsite development (surface mining) and disposal of large quantities of waste solids constitute important sources of potential impact. In addition, air emissions require monitoring for trace metals, polycyclic aromatic hydrocarbons, phenols, and other emissions. Potential biological impacts from long-term exposure to these emissions are unknown, and additional research and data analysis may be necessary to determine such effects. Possible effects of pollutants on vegetation and human populations are discussed. The occurrence of chemical contaminants in liquid effluents and the bioaccumulation of these contaminants in aquatic organisms may lead to adverse ecological impact. Socioeconomic impacts are similar to those from a chemical plant of equivalent size and are summarized and contrasted for the three surrogate sites.« less

  7. A low cost, high performance remotely controlled backhoe/excavator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rizzo, J.

    1995-12-31

    This paper addresses a state of the art, low cost, remotely controlled backhoe/excavator system for remediation use at hazardous waste sites. The all weather, all terrain, Remote Dig-It is based on a simple, proven construction platform and incorporates state of the art sensors, control, telemetry and other subsystems derived from advanced underwater remotely operated vehicle systems. The system can be towed to a site without the use of a trailer, manually operated by an on board operator or operated via a fiber optic or optional RF communications link by a remotely positioned operator. A proportional control system is piggy backedmore » onto the standard manual control system. The control system improves manual operation, allows rapid manual/remote mode selection and provides fine manual or remote control of all functions. The system incorporates up to 4 separate video links, acoustic obstacle proximity sensors, and stereo audio pickups and an optional differential GPS navigation. Video system options include electronic panning and tilting within a distortion-corrected wide angle field of view. The backhoe/excavator subsystem has a quick disconnect interface feature which allows its use as a manipulator with a wide variety of end effectors and tools. The Remote Dig-It was developed to respond to the need for a low-cost, effective remediation system for use at sites containing hazardous materials. The prototype system was independently evaluated for this purpose by the Army at the Jefferson Proving Ground where it surpassed all performance goals. At the time of this writing, the Remote Dig-It system is currently the only backhoe/excavator which met the Army`s goals for remediation systems for use at hazardous waste sites and it costs a fraction of any known competing offerings.« less

  8. Minimum separation distances for natural gas pipeline and boilers in the 300 area, Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daling, P.M.; Graham, T.M.

    1997-08-01

    The U.S. Department of Energy (DOE) is proposing actions to reduce energy expenditures and improve energy system reliability at the 300 Area of the Hanford Site. These actions include replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing a new natural gas distribution system to provide a fuel source for many of these units, and constructing a central control building to operate and maintain the system. The individual heating units will include steam boilers that are to be housed in individual annex buildings located at some distance away from nearby 300 Area nuclearmore » facilities. This analysis develops the basis for siting the package boilers and natural gas distribution systems to be used to supply steam to 300 Area nuclear facilities. The effects of four potential fire and explosion scenarios involving the boiler and natural gas pipeline were quantified to determine minimum separation distances that would reduce the risks to nearby nuclear facilities. The resulting minimum separation distances are shown in Table ES.1.« less

  9. The ARC (Astrophysical Research Consortium) telescope project.

    NASA Astrophysics Data System (ADS)

    Anderson, K. S.

    A consortium of universities intends to construct a 3.5 meter optical-infrared telescope at a site in south-central New Mexico. The use of innovative mirror technology, a fast primary, and an alt-azimuth mounting results in a compact and lightweight instrument. This telescope will be uniquely well-suited for addressing certain observational programs by virtue of its capability for fully remote operation and rapid instrument changes.

  10. Reconnaissance of intertidal and subtidal zones of Back Island, Behm Canal, Southeast Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strand, J.A.; Young, J.S.

    1986-09-01

    A diver reconnaissance of the intertidal and subtidal zones of Back Island, Southeast Alaska, was performed May 20-22, 1986. The specific objectives were to catalog potentially vulnerable shellfish, other invertebrates, and plant resources, and to identify potential herring spawning sites. This effort was designed to supplement the existing ecological data base for Back Island that would be used during the National Environmental Policy Act (NEPA) documentation process. A NEPA document will be prepared that describes the site environment and assesses impacts from the proposed construction and operation of the Southeast Alaska Acoustic Measurement Facility (SEAFAC). Nine diver transects were establishedmore » around Back Island. Particular attention was devoted to proposed locations for the pier and float facilities and range-operations and shore-power cable run-ups.« less

  11. Hanford Site 100-N Area In Situ Bioremediation of UPR-100-N-17, Deep Petroleum Unplanned Release - 13245

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saueressig, Daniel G.

    2013-07-01

    In 1965 and 1966, approximately 303 m{sup 3} of Number 2 diesel fuel leaked from a pipeline used to support reactor operations at the Hanford Site's N Reactor. N Reactor was Hanford's longest operating reactor and served as the world's first dual purpose reactor for military and power production needs. The Interim Action Record of Decision for the 100-N Area identified in situ bioremediation as the preferred alternative to remediate the deep vadose zone contaminated by this release. A pilot project supplied oxygen into the vadose zone to stimulate microbial activity in the soil. The project monitored respiration rates asmore » an indicator of active biodegradation. Based on pilot study results, a full-scale system is being constructed and installed to remediate the vadose zone contamination. (authors)« less

  12. Localised and limited impact of a dredging operation on coral cover in the northwestern lagoon of New Caledonia.

    PubMed

    Adjeroud, Mehdi; Gilbert, Antoine; Facon, Mathilde; Foglia, Marion; Moreton, Benjamin; Heintz, Tom

    2016-04-15

    We report here an interannual survey (2006-2012) of coral cover in the northwestern lagoon of New Caledonia, to assess the impact of an important dredging operation (August 2008-February 2010) associated with the construction of the largest nickel mining site in the Pacific. A BACI (Before-After Control-Impact) analysis failed to detect any significant interaction between period (before, during, and after dredging) and the category of the stations (impact vs. control). Among the 31 stations surveyed, only seven showed decreasing coral cover during the study period, mainly due to a decline in Acroporidae. However, the relationship between the dredging and this decrease was highly plausible only for one station, situated 0.9km from the dredging site. High hydrodynamism in the study area, the abundance of resistant corals and efficient protective measures during the dredging operation might explain these localised and limited impacts. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. On-site remediation shakes out

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Morris, G.D.L.

    1996-01-03

    Consolidation in several segments of the environmental services industry is being driven by continued sluggishness. Process engineering and construction company Fluor Daniel (Irvine, CA) has reached a definitive agreement to acquire a controlling interest in environmental remediation firm Groundwater Technology Inc.. Fluor Daniel will combine its environmental services unit with GTI. Fluor Daniel/GTI will be headquartered in Norwood and remain a publicly traded entity. The transaction is subject to approval by GTI`s shareholders and other customer conditions and is expected to be completed in the next few months. Fluor Daniel/GTI will operate as a subsidiary of Fluor Daniel and willmore » become one of the world`s largest on-site remediation companies. David Myers, president of Fluor Daniel`s environmental services unit, will become chairman, while Walter C. Barber, chairman and CEO of GTI, will continue as the company`s president and CEO. Certain Fluor Daniel environmental business components, specifically the Department of Energy management and operations business, will not be included in the transaction and will operate separately.« less

  14. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    DOT National Transportation Integrated Search

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swift, Barry D.; Tarantino, Joseph J., P. E.

    The Paducah Gaseous Diffusion Plant (PGDP), owned by the Department of Energy (DOE), has been enriching uranium since the early 1950s. The enrichment process involves electrical and mechanical components that require periodic cleaning. The primary cleaning agent was trichloroethene (TCE) until the late 1980s. Historical documentation indicates that a mixture of TCE and dry ice were used at PGDP for testing the integrity of steel cylinders, which stored depleted uranium. TCE and dry ice were contained in a below-ground pit and used during the integrity testing. TCE seeped from the pit and contaminated the surrounding soil. The Lasagna{trademark} technology wasmore » identified in the Record of Decision (ROD) as the selected alternative for remediation of the cylinder testing site. A public-private consortium formed in 1992 (including DOE, the U.S. Environmental Protection Agency, and the Kentucky Department for Environmental Protection, Monsanto, DuPont, and General Electric) developed the Lasagna{trademark} technology. This innovative technology employs electrokinetics to remediate soil contaminated with organics and is especially suited to sites with low permeability soils. This technology uses direct current to move water through the soil faster and more uniformly than hydraulic methods. Electrokinetics moves contaminants in soil pore water through treatment zones comprised of iron filings, where the contaminants are decomposed to basic chemical compounds such as ethane. After three years of development in the laboratory, the consortium field tested the Lasagna{trademark} process in several phases. CDM installed and operated Phase I, the trial installation and field test of a 150-square-foot area selected for a 120-day run in 1995. Approximately 98 percent of the TCE was removed. CDM then installed and operated the next phase (IIa), a year-long test on a 600-square-foot site. Completed in July 1997, this test removed 75 percent of the total volume of TCE down to a depth of 45 feet. TCE in the test sites. Based on the successful field tests (Phases I and IIa), the ROD was prepared and the Lasagna{trademark} alternative was selected for remediation of TCE contaminated soils at the cylinder testing site Solid Waste Management Unit 91(SWMU 91). Bechtel Jacobs Company LLC contracted CDM to construct and operate a full-scale Lasagna{trademark} remediation system at the site (Phase IIb). Construction began in August 1999 and the operational phase was initiated in December 1999. The Lasagna{trademark} system was operated for two years and reduced the average concentration of TCE in SWMU 91 soil from 84 ppm to less than 5.6 ppm. Verification sampling was conducted during May, 2002. Results of the verification sampling indicated the average concentration of TCE in SWMU 91 soil was 0.38 ppm with a high concentration of 4.5 ppm.« less

  16. Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Verma, Puneet; Casey, Dan

    This report summarizes the work conducted under U.S. Department of Energy (US DOE) contract DE-FC36-04GO14286 by Chevron Technology Ventures (CTV, a division of Chevron U.S.A., Inc.), Hyundai Motor Company (HMC), and UTC Power (UTCP, a United Technologies company) to validate hydrogen (H2) infrastructure technology and fuel cell hybrid vehicles. Chevron established hydrogen filling stations at fleet operator sites using multiple technologies for on-site hydrogen generation, storage, and dispensing. CTV constructed five demonstration stations to support a vehicle fleet of 33 fuel cell passenger vehicles, eight internal combustion engine (ICE) vehicles, three fuel cell transit busses, and eight internal combustion enginemore » shuttle busses. Stations were operated between 2005 and 2010. HMC introduced 33 fuel cell hybrid electric vehicles (FCHEV) in the course of the project. Generation I included 17 vehicles that used UTCP fuel cell power plants and operated at 350 bar. Generation II included 16 vehicles that had upgraded UTC fuel cell power plants and demonstrated options such as the use of super-capacitors and operation at 700 bar. All 33 vehicles used the Hyundai Tucson sports utility vehicle (SUV) platform. Fleet operators demonstrated commercial operation of the vehicles in three climate zones (hot, moderate, and cold) and for various driving patterns. Fleet operators were Southern California Edison (SCE), AC Transit (of Oakland, California), Hyundai America Technical Center Inc. (HATCI), and the U.S. Army Tank Automotive Research, Development and Engineering Center (TARDEC, in a site agreement with Selfridge Army National Guard Base in Selfridge, Michigan).« less

  17. Environmental Projects. Volume 17; Biological Assessment, Opinion, and New 34-Meter Beam-Waveguide Antenna (DSS 24) at Apollo Site

    NASA Technical Reports Server (NTRS)

    Bengelsdorf, Irving

    1996-01-01

    This report deals with the Biological Assessment, Biological Opinion and Final Report on the construction of a high- efficiency 34-meter, multifrequency beam-waveguide antenna at the Apollo Site of the Goldstone Deep Space Communications Complex, operated by JPL. According to the Endangered Species Act of 1973, a Biological Assessment must be conducted and a Biological Opinion, with terms and conditions, rendered (the Opinion by the U.S. Department of the Interior) before construction of any federal project that may affect endangered or threatened flora or fauna. After construction, a final report is filed with the Department. The desert tortoise, designated "threatened" by the U.S. Fish and Wildlife Service, and the Mojave ground squirrel and the Lane Mountain milk vetch, both designated "candidate threatened," required the reporting specified by the Act. The Assessment found no significant danger to the animal species if workers are educated about them. No stands of the plant species were observed in the surveyed construction area. The Department issued a Biological Opinion to safeguard the two animal species. The Service and the California Department of Fish and Game both issued a Biological Concurrence that JPL had satisfied all environmental criteria for preserving threatened species.

  18. Threatened and Endangered Species Evaluation for Operating Commercial Nuclear Power Generating Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sackschewsky, Michael R.

    2004-01-15

    The Endangered Species Act (ESA) of 1973 requires that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered (T&E) species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to themore » provisions of the ESA. The Office of Nuclear Reactor Regulation (NRR) staff have performed appropriate assessments of potential impacts to threatened or endangered species, and consulted with appropriate agencies with regard to protection of such species in authorizing the construction, operation, and relicensing of nuclear power generating facilities. However, the assessments and consultations concerning many facilities were performed during the 1970's or early 1980's, and have not been re-evaluated in detail or updated since those initial evaluations. A review of potential Endangered Species Act issues at licensed nuclear power facilities was completed in 1997. In that review 484 different ESA-listed species were identified as potentially occurring near one or more of the 75 facility sites that were examined. An update of the previous T&E species evaluation at this time is desired because, during the intervening 6 years: nearly 200 species have been added to the ESA list, critical habitats have been designated for many of the listed species, and significantly more information is available online, allowing for more efficient high-level evaluations of potential species presence near sites and the potential operation impacts. The updated evaluation included searching the NRC's ADAMS database to find any documents related to T&E species take, consultations, and evaluations of potential effects of operation on T&E species. This search recovered a total of approximately 100 documents from 13 sites. Sites that were in the relicensing or decommissioning processes were excluded from the ADAMS search. In general the ADAMS search did not reveal any serious deficiencies or compliance problems. The most notable finds were reports of takes of green sea turtles at Diablo Canyon. While these events were reported to both the NRC and to NOAA Fisheries, no record of interaction between the two federal agencies was found. Species potentially present at each site were determined via querying the Geographical, Environmental, and Siting Information System (GEn&SIS) database developed for the NRC by Lawrence Livermore National Laboratory. The results of these queries were compared against the 1997 review, and in the cases of sites that were in the relicensing process, with the results of those site specific evaluations. A total of 452 T&E species were identified as potentially occurring near one or more of the operating commercial nuclear power generating plants. Information about each of these species was gathered to support an assessment of the probability of occurrence at each of the reactor sites. Based on the assessments of which species are potentially affected at each site, and the information gathered through the ADAMS search, each site was assigned a priority value for follow-up evaluations. The priority listing did not include any sites that had entered the relicensing process, those where the licensee has indicated that they intend to enter the relicensing process before the end of 2005, or those that have entered the decommissioning process. Of the 39 remaining sites, those that were identified as the highest priority for follow-on evaluations are: Diablo Canyon, San Onofre, Crystal River, Harris, and Vogtle, followed by South Texas, Palo Verde, Salem, and Cooper.« less

  19. [Assessment of risk of burden in construction: improvement interventions and contribution of the competent physician].

    PubMed

    Martinelli, R; Tarquini, M

    2012-01-01

    Three construction companies in three years have changed the operating modes, making use of innovative carpentry, with little amount of equipment, improved usability of the site, reduced cleaning time, less manual handling and reduced risk of accidents. The Competent Doctor has participated in the review of the risk assessment of manual handling: data has been acquired on musculoskeletal disorders to compare, in terms of this innovation, the average trend and changes, with encouraging results in terms of incidence of musculoskeletal disorders, absenteeism due to illness by these causes, new cases of lumbar diseases. It remains difficult in building to assess manual handling risk, but the collaboration between the Employer, Prevention and Protection Service and Competent Doctor, thanks to the greater attention that the design subject to these issues, suggests improvements and further steps to extend to all phases of operation of building.

  20. New Explorer-class AUV Ready for Deep-water, High-resolution Habitat Mapping Studies

    NASA Astrophysics Data System (ADS)

    Potts, T. A.; Shepard, A.

    2006-12-01

    In 2002, a partnership was formed to design, construct, field test, and operate an Autonomous Underwater Vehicle (AUV) equipped to provide high-resolution (<1 m) maps of offshore seafloor habitats down to 2200 meters depth. An ISE Explorer-class AUV was constructed and equipped to conduct seafloor characterization via multi-beam EM2000 providing both bathymetry and backscatter. Three 10-day cruises will be conducted between August and November 2006 to put the vehicle through its paces and refine operating protocols. It is anticipated that the vehicle will log over 200 hours of bottom time and acquire over 30 GB of data at proposed marine protected area sites off North and South Carolina, Gray's Reef National Marine Sanctuary off Georgia, and at the Oculina Habitat Area of Particular Concern off the east coast of Florida. The AUV will begin supporting competitively reviewed science projects starting in 2007.

  1. Safe, Cost Effective Management of Inactive Facilities at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austin, W. E.; Yannitell, D. M.; Freeman, D. W.

    The Savannah River Site is part of the U.S. Department of Energy complex. It was constructed during the early 1950s to produce basic materials (such as plutonium-239 and tritium) used in the production of nuclear weapons. The 310-square-mile site is located in South Carolina, about 12 miles south of Aiken, South Carolina, and about 15 miles southeast of Augusta, Georgia. Savannah River Site (SRS) has approximately 200 facilities identified as inactive. These facilities range in size and complexity from large nuclear reactors to small storage buildings. These facilities are located throughout the site including three reactor areas, the heavy watermore » plant area, the manufacturing area, and other research and support areas. Unlike DOE Closure Sites such as Hanford and Rocky Flats, SRS is a Project Completion Site with continuing missions. As facilities complete their defined mission, they are shutdown and transferred from operations to the facility disposition program. At the SRS, Facilities Decontamination and Decommissioning (FDD) personnel manage the disposition phase of a inactive facility's life cycle in a manner that minimizes life cycle cost without compromising (1) the health or safety of workers and the public or (2) the quality of the environment. The disposition phase begins upon completion of operations shutdown and extends through establishing the final end-state. FDD has developed innovative programs to manage their responsibilities within a constrained budget.« less

  2. Workers Welding on ML

    NASA Image and Video Library

    2014-02-24

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A construction worker prepares a metal beam that will be attached to the ML. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Dimitri Gerondidakis

  3. Satellite Power System (SPS) environmental impacts, preliminary assessment

    NASA Technical Reports Server (NTRS)

    Livingston, F. R.

    1978-01-01

    Present power plant assessment factors are used to present satellite power system (SPS) impacts. In contrast to oil, gas, nuclear and coal fueled power plants, the SPS and hydroelectric power plants produce air, water, and solid waste emissions only during the construction phase. Land use impacts result from the placement of rectennas used for microwave receiving and rectifying. Air quality impacts of the SPS resulting from the construction phase amount to 0.405 metric tons per megawatt year. Solid wastes impacts are 0.108 metric tons per year of operation. Other impacts such as those caused by heavy lift launch vehicle sites are also discussed.

  4. KSC-2014-2018

    NASA Image and Video Library

    2014-04-04

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A construction worker uses a measuring device on the surface of the ML. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Cory Huston

  5. A site evaluation campaign for a ground based atmospheric Cherenkov telescope in Romania

    NASA Astrophysics Data System (ADS)

    Radu, Aurelian Andrei; Angelescu, Tatiana; Curtef, Valentin; Delia, Florin; Felea, Daniel; Goia, Ioana; Haşegan, Dumitru; Lucaschi, Bogdan; Manea, Ancuta; Popa, Vlad; Raliţă, Ioan; Văcăreanu, Radu

    2012-07-01

    Around the world, several scientific projects share the interest of a global network of small Cherenkov telescopes for monitoring observations of the brightest blazars—the DWARF network. A small, ground based, imaging atmospheric Cherenkov telescope of last generation is intended to be installed and operated in Romania as a component of the DWARF network. To prepare the construction of the observatory, two support projects have been initiated. Within the framework of these projects, we have assessed a number of possible sites where to settle the observatory. In this paper we submit a brief report on the general characteristics of the best four sites selected after the local infrastructure, the nearby facilities and the social impact criteria have been applied.

  6. A Global Survey and Interactive Map Suite of Deep Underground Facilities; Examples of Geotechnical and Engineering Capabilities, Achievements, Challenges: (Mines, Shafts, Tunnels, Boreholes, Sites and Underground Facilities for Nuclear Waste and Physics R&D)

    NASA Astrophysics Data System (ADS)

    Tynan, M. C.; Russell, G. P.; Perry, F.; Kelley, R.; Champenois, S. T.

    2017-12-01

    This global survey presents a synthesis of some notable geotechnical and engineering information reflected in four interactive layer maps for selected: 1) deep mines and shafts; 2) existing, considered or planned radioactive waste management deep underground studies, sites, or disposal facilities; 3) deep large diameter boreholes, and 4) physics underground laboratories and facilities from around the world. These data are intended to facilitate user access to basic information and references regarding deep underground "facilities", history, activities, and plans. In general, the interactive maps and database [http://gis.inl.gov/globalsites/] provide each facility's approximate site location, geology, and engineered features (e.g.: access, geometry, depth, diameter, year of operations, groundwater, lithology, host unit name and age, basin; operator, management organization, geographic data, nearby cultural features, other). Although the survey is not all encompassing, it is a comprehensive review of many of the significant existing and historical underground facilities discussed in the literature addressing radioactive waste management and deep mined geologic disposal safety systems. The global survey is intended to support and to inform: 1) interested parties and decision makers; 2) radioactive waste disposal and siting option evaluations, and 3) safety case development as a communication tool applicable to any mined geologic disposal facility as a demonstration of historical and current engineering and geotechnical capabilities available for use in deep underground facility siting, planning, construction, operations and monitoring.

  7. Risk assessment of groundwater environmental contamination: a case study of a karst site for the construction of a fossil power plant.

    PubMed

    Liu, Fuming; Yi, Shuping; Ma, Haiyi; Huang, Junyi; Tang, Yukun; Qin, Jianbo; Zhou, Wan-Huan

    2017-12-20

    This paper presents a demonstration of an integrated risk assessment and site investigation for groundwater contamination through a case study, in which the geologic and hydrogeological feature of the site and the blueprint of the fossil power plant (FPP) were closely analyzed. Predictions for groundwater contamination in case of accidents were performed by groundwater modeling system (GMS) and modular three-dimensional multispecies transport model (MT3DMS). Results indicate that the studied site area presents a semi-isolated hydrogeological unit with multiplicity in stratum lithology, the main aquifers at the site are consisted of the filled karst development layer with a thickness between 6.0 and 40.0 m. The poor permeability of the vadose zone at the FPP significantly restricted the infiltration of contaminants through the vadose zone to the subsurface. The limited influence of rarely isotropic porous karstified carbonate rocks on the groundwater flow system premised the simulate scenarios of plume migration. Analysis of the present groundwater chemistry manifested that that the groundwater at the site and the local area are of the HCO 3 -Ca, HCO 3 , and SO 4 -Ca types. A few of the water samples were contaminated by coliform bacteria and ammonia nitrogen as a result of the local cultivation. Prediction results indicate that the impact of normal construction and operation processes on the groundwater environment is negligible. However, groundwater may be partly contaminated within a certain period in the area of leakage from the diesel tanks, the industrial wastewater pool, and the cooling tower water tank in case of accidents. On a positive note, none of the plumes would reach the local sensitive areas for groundwater using. Finally, an anti-seepage scheme and a monitoring program are proposed to safeguard the groundwater protection. The integrated method of the site investigation and risk assessment used in this case study can facilitate the protection of groundwater for the construction of large-scale industrial project.

  8. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arends, J.; Sandusky, William F.

    2010-06-30

    Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

  9. The Airfloat HL project. [design analysis of airships and lift devices for materials handling

    NASA Technical Reports Server (NTRS)

    Mowforth, E.

    1975-01-01

    A design study is described for a large low-cost rigid airship intended primarily for the movement of large indivisible loads (cargo) between industrial sites. A survey of the ship and its overall performance is followed by accounts of the operational procedures for the above function and for an alternative application to unit module transfer between fixed terminals. A final section indicates the estimated costs of construction and operation. Safety factors are also considered. Lifting devices such as winches, hoists are shown and described, and airship configurations are also shown.

  10. Experimental study on performance of new low-density proppant

    NASA Astrophysics Data System (ADS)

    Tian, Yu; Qu, Zhanqing; Cheng, Yingchun; Gong, Yuanzhi

    2018-04-01

    In recent years, Unconventional oil and gas resources have gradually become an important part of oil and gas development. The development of the above resources must be applied to hydraulic fracturing technology. As a key material in fracturing technology, the proppant is an important factor influencing the success of fracturing. The parameters of ceramsite are excellent which can be used in most fracturing operation. And self-suspension proppant also has good parameters, gelling and gelling breaking, can greatly simplify the oilfield fracturing site construction difficulty, so it can be a new kind of fracturing material as oilfield operation.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dougan, P.M.

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  12. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  13. Foothills Parkway Section 8B Final Environmental Report, Volume 3, Appendix D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blasing, T.J.; Cada, G.F.; Carer, M.

    1999-07-01

    In 1994, Oak Ridge National Laboratory (ORNL) was tasked by the National Park Service (NPS) to prepare an Environmental Report (ER) for Section 8B of the Foothills Parkway in the Great Smoky Mountains National Park (GSMNP). Section 8B represents 27.7 km (14.2 miles) of a total of 115 km (72 miles) of the planned Foothills Parkway and would connect the Cosby community on the east to the incorporated town of Pittman Center to the west. The major deliverables for the project are listed. From August 1995 through October 1996, NPS, GSMNP, and ORNL staff interacted with Federal Highway Administration staffmore » to develop a conceptual design plan for Section 8B with the intent of protecting critical resources identified during the ER process to the extent possible. In addition, ORNL arranged for bioengineering experts to discuss techniques that might be employed on Section 8B with NPS, GSMNP, and ORNL staff during September 1996. For the purposes of this ER, there are two basic alternatives under consideration: (1) a build alternative and (2) a no-build alternative. Within the build alternative are a number of options including constructing Section 8B with no interchanges, constructing Section 8B with an interchange at SR416 or U.S. 321, constructing Section 8B with a spur road on Webb Mountain, and considering operation of Section 8B both before and after the operation of Section 8C. The no-build alternative is considered the no-action alternative and is not to construct Section 8B. This volume of the ER inventories the fishes and benthic macroinvertebrates inhabiting the aquatic ecosystems potentially affected by the proposed construction of Section 8B. Stream biological surveys were completed at 31 stream sites during the Fall of 1994. The sampling strategy for both invertebrates and fish was to survey the different taxa from all available habitats. For benthic invertebrates, a standardized qualitative manual collection technique was employed for all 31 stations. For fish, all streams of sufficient water were sampled using various methods of electroshocking. Two listed species were identified during the surveys: the Allegheny snaketail dragonfly (formerly a C2 federal candidate species found at six of the stream survey sites) and the tangerine darter (a Tennessee state special concern species found at two of the stream survey sites).« less

  14. Evaluation of public and worker exposure due to naturally occurring asbestos in gravel discovered during a road construction project.

    PubMed

    Perkins, Robert A; Hargesheimer, John; Vaara, Leah

    2008-09-01

    During a repair and reconstruction project of an unpaved highway in a remote region of Alaska, workers discovered, after construction had commenced, that the materials used from a local material site contained asbestos (variously described as tremolite or actinolite). The regional geology indicated the presence of ultramafic rock, which often contains asbestos. Evaluation of asbestos exposure to workers, their equipment, and living quarters was required, as was the possible future exposure of workers and the general public to asbestos already used in the roadway construction. In addition, a decision was needed on whether to use materials from the contaminated site in the future. Of the almost 700 breathing zone air monitoring samples taken of the workers, 3% of the samples indicated exposures at or near 0.1 f/cc by the National Institute for Occupational Safety and Health (NIOSH) 7400 phase contrast microscopy (PCM) procedure. Thirty-six of the PCM samples underwent transmission electron microscopy (TEM) analysis by the NIOSH 7402 procedure, which indicated that about 40% of the fibers were asbestos. After classifying samples by tasks performed by workers, analysis indicated that workers, such as road grader operators who ground or spread materials, had the highest exposures. Also, monitoring results indicated motorist exposure to be much less than 0.1 f/cc. The design phase of any proposed construction project in regions that contain ultramafic rock must consider the possibility of amphibole contamination of roadway materials, and budget for exploration and asbestos analysis of likely materials sites.

  15. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  16. A Versatile Lifting Device for Lunar Surface Payload Handling, Inspection and Regolith Transport Operations

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; Dorsey, John T.; Collins, Timothy J.; King, Bruce D.; Mikulas, Martin M., Jr.

    2008-01-01

    Devices for lifting and transporting payloads and material are critical for efficient Earth-based construction operations. Devices with similar functionality will be needed to support lunar-outpost construction, servicing, inspection, regolith excavation, grading and payload placement. Past studies have proposed that only a few carefully selected devices are required for a lunar outpost. One particular set of operations involves lifting and manipulating payloads in the 100 kg to 3,000 kg range, which are too large or massive to be handled by unassisted astronauts. This paper will review historical devices used for payload handling in space and on earth to derive a set of desirable features for a device that can be used on planetary surfaces. Next, an innovative concept for a lifting device is introduced, which includes many of the desirable features. The versatility of the device is discussed, including its application to lander unloading, servicing, inspection, regolith excavation and site preparation. Approximate rules, which can be used to size the device for specific payload mass and reach requirements, are provided. Finally, details of a test-bed implementation of the innovative concept, which will be used to validate the structural design and develop operational procedures, is provided.

  17. Cleanup Verification Package for the 618-8 Burial Ground

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. J. Appel

    2006-08-10

    This cleanup verification package documents completion of remedial action for the 618-8 Burial Ground, also referred to as the Solid Waste Burial Ground No. 8, 318-8, and the Early Solid Waste Burial Ground. During its period of operation, the 618-8 site is speculated to have been used to bury uranium-contaminated waste derived from fuel manufacturing, and construction debris from the remodeling of the 313 Building.

  18. Frequency-Modulated Continuous-Wave Fm-Cw Radar for Evaluation of Refractory Structures Used in Glass Manufacturing Furnaces

    NASA Astrophysics Data System (ADS)

    Carroll, B.; Kharkovsky, S.; Zoughi, R.; Limmer, R.

    2009-03-01

    A frequency-modulated continuous-wave (FM-CW) handheld radar operating in the frequency range of 8-18 GHz, resulting in a relatively fine range resolution was designed and constructed for on-site inspection of refractory structure thickness. This paper presents the design of the radar and the results of measurements conducted on typical refractory furnace structures assembled in the laboratory.

  19. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  20. Educational Programs for Graduate Level Learners and Professionals - National Radio Astronomy Observatory National and International Non-Traditional Exchange Program

    NASA Astrophysics Data System (ADS)

    Wingate, Lory Mitchell

    2017-01-01

    The National Radio Astronomy Observatory’s (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering to chosen participants within a nine-week program held at NRAO in New Mexico. Participants are typically graduate level students or professionals. Participation in the NINE Program is through a competitive process. The program includes a hands-on service project designed to increase the participants knowledge of radio astronomy. The approach demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal science results.The NINE teaches participants important sustainable skills associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners are expected to return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.

  1. Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    COVEY, L.I.

    2000-11-28

    The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will havemore » been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, {sup 90}Sr and {sup 137}Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the {sup 137}Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.« less

  2. Basic examination of a technique to visualize space filled with dense smoke using millimeter-wave radar

    NASA Astrophysics Data System (ADS)

    Omine, Yukio; Sakai, Masaki; Aoki, Yoshimitsu; Takagi, Mikio

    2004-10-01

    In recent years, crisis management in response to terrorist attacks and natural disasters, as well as accelerating rescue operations has become an important issue. Rescue operations greatly influence human lives, and require the ability to accurately and swiftly communicate information as well as assess the status of the site. Currently, considerable amount of research is being conducted for assisting rescue operations, with the application of various engineering techniques such as information technology and radar technology. In the present research, we believe that assessing the status of the site is most crucial in rescue and firefighting operations at a fire disaster site, and aim to visualize the space that is smothered with dense smoke. In a space filled with dense smoke, where visual or infrared sensing techniques are not feasible, three-dimensional measurements can be realized using a compact millimeter wave radar device combined with directional information from a gyro sensor. Using these techniques, we construct a system that can build and visualize a three-dimensional geometric model of the space. The final objective is to implement such a system on a wearable computer, which will improve the firefighters' spatial perception, assisting them in the baseline assessment and the decision-making process. In the present paper, we report the results of the basic experiments on three-dimensional measurement and visualization of a space that is smoke free, using a millimeter wave radar.

  3. Defining a quantitative framework for evaluation and optimisation of the environmental impacts of mega-event projects.

    PubMed

    Parkes, Olga; Lettieri, Paola; Bogle, I David L

    2016-02-01

    This paper presents a novel quantitative methodology for the evaluation and optimisation of the environmental impacts of the whole life cycle of a mega-event project: construction and staging the event and post-event site redevelopment and operation. Within the proposed framework, a mathematical model has been developed that takes into account greenhouse gas (GHG) emissions resulting from use of transportation fuel, energy, water and construction materials used at all stages of the mega-event project. The model is applied to a case study - the London Olympic Park. Three potential post-event site design scenarios of the Park have been developed: Business as Usual (BAU), Commercial World (CW) and High Rise High Density (HRHD). A quantitative summary of results demonstrates that the highest GHG emissions associated with the actual event are almost negligible compared to those associated with the legacy phase. The highest share of emissions in the legacy phase is attributed to embodied emissions from construction materials (almost 50% for the BAU and HRHD scenarios) and emissions resulting from the transportation of residents, visitors and employees to/from the site (almost 60% for the CW scenario). The BAU scenario is the one with the lowest GHG emissions compared to the other scenarios. The results also demonstrate how post-event site design scenarios can be optimised to minimise the GHG emissions. The overall outcomes illustrate how the proposed framework can be used to support decision making process for mega-event projects planning. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  4. Site selection for the future stations of the french permanent broadband network

    NASA Astrophysics Data System (ADS)

    Vergne, Jérôme; Charade, Olivier

    2013-04-01

    RESIF (REseau SIsmologique et géodésique Français) is a new French research infrastructure dedicated to the observation of earth deformation based on seismic and geodetic instruments mainly located in France. One of its major component, called RESIF-CLB (Construction Large Bande), is devoted to the evolution of the permanent seismic broadband network in metropolitan France with the objective to complement the 45 existing stations with ~155 new stations within the next eight years. This network will be used for various scientific objectives including deep structures imaging and national seismicity monitoring. The chosen network topology consists in a backbone of homogeneously distributed stations (long wavelength array) completed by additional stations in seismically active regions. Management of the RESIF-CLB project is carried out by the technical division of INSU (Institut National des Sciences de l'Univers) who will rely on eight regional observatories and the CEA-LDG for the construction and operation of the stations. To optimize the performance of the network, we put a strong emphasis on the standardization of the stations in term of vault types, scientific and technical instrumentation and operation procedures. We also set up a procedure for site selection requiring that every potential site has to be tested for at least 3 weeks with a minimalist installation. Analysis of the continuous ambient noise records is then included in a standardized report submitted to all committed partners for acceptance. During the last two years, about 60 potential new sites have been tested, spanning various places and environments. We present a review of the seismic noise measurements at these sites and discuss the influence of different types of noise sources depending on the frequency band of interest. For example, we show that regional population distribution can be used as a proxy to infer the noise level at frequencies higher than 1 Hz. Based on similar noise analyses at existing permanent sites, we also discuss the fair benefit of our site testing procedure for the estimation of the long period noise level once the station is settled.

  5. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  6. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  7. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  8. 41 CFR 102-76.55 - What sustainable development principles must Federal agencies apply to the siting, design, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... construction of new facilities, which include— (a) Optimizing site potential; (b) Minimizing non-renewable... development principles must Federal agencies apply to the siting, design, and construction of new facilities... Federal agencies apply to the siting, design, and construction of new facilities? In keeping with the...

  9. Determinants of dust exposure in tunnel construction work.

    PubMed

    Bakke, Berit; Stewart, Patricia; Eduard, Wijnand

    2002-11-01

    In tunnel construction work, dust is generated from rock drilling, rock bolting, grinding, scaling, and transport operations. Other important dust-generating activities are blasting rock and spraying wet concrete on tunnel walls for strength and finishing work. The aim of this study was to identify determinants of dust exposure in tunnel construction work and to propose control measures. Personal exposures to total dust, respirable dust, and alpha-quartz were measured among 209 construction workers who were divided into 8 job groups performing similar tasks: drill and blast workers, shaft drilling workers, tunnel boring machine workers, shotcreting operators, support workers, concrete workers, outdoor concrete workers, and electricians. Information on determinants was obtained from interviewing the workers, observation by the industrial hygienist responsible for the sampling, and the job site superintendent. Multivariate regression models were used to identify determinants associated with the dust exposures within the job groups. The geometric mean exposure to total dust, respirable dust, and alpha-quartz for all tunnel workers was 3.5 mg/m(3) (GSD = 2.6), 1.2 mg/m(3) (GSD = 2.4), and 0.035 mg/m(3) (GSD = 5.0), respectively. A total of 15 percent of the total dust measurements, 5 percent of the respirable dust, and 21 percent of the alpha-quartz exceeded the Norwegian OELs of 10 mg/m(3), 5 mg/m(3), and 0.1 mg/m(3), respectively. Job groups with highest geometric mean total dust exposure were shotcreting operators (6.8 mg/m(3)), tunnel boring machine workers (6.2 mg/m(3)), and shaft drilling workers (6.1 mg/m(3)). The lowest exposed groups to total dust were outdoor concrete workers (1.0 mg/m(3)), electricians (1.4 mg/m(3)), and support workers (1.9 mg/m(3)). Important determinants of exposure were job group, job site, certain tasks (e.g., drilling and scaling), the presence of a cab, and breakthrough of the tunnel. The use of ventilated, closed cabs appeared to be the single most important control measure for lowering exposures.

  10. Solar project description for environmental partnership, Upper Freehold Township, Monmouth County, New Jersey

    NASA Astrophysics Data System (ADS)

    1982-08-01

    A solar house is described. It is a three-story single family detached residence in New Jersey. It is equipped with a 540 cubic foot vented Trombe wall constructed of concrete filled concrete blocks and glazed with 344 square feet of insulated tempered glass. Heat is also provided by a 168 square foot sunspace of insulated glass. In the loft area is a phase change storage system composed of 32 PSI Thermal-81 phase change storage rods. Auxiliary heating is y a wood-burning stove and a dual-fuel, propane and wood, forced air furnace. A breadbox type hot water preheater is located on the roof. Summer cooling is accomplished by opening windows, doors, and exhaust dampers and operating a whole house ventilation fan. Operation of the solar system and the auxiliary subsystems may involve one or more of 5 modes: collector-to-storage, storage-to-space heating, auxiliary-to-space heating, energy-to-load-summer cooling, and domestic hot water. The house, its solar heating systems, storage, load, operation, on-site performance evaluation instrumentation, and data depicting the solar portion of construction costs are outlined.

  11. Comparison of conventional vs. modular hydrogen refueling stations and on-site production vs. delivery.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hecht, Ethan S.; Pratt, Joseph William

    To meet the needs of public and private stakeholders involved in the development, construction, and operation of hydrogen fueling stations needed to support the widespread roll-out of hydrogen fuel cell electric vehicles, this work presents publicly available station templates and analyses. These ‘Reference Stations’ help reduce the cost and speed the deployment of hydrogen stations by providing a common baseline with which to start a design, enable quick assessment of potential sites for a hydrogen station, identify contributors to poor economics, and suggest areas of research. This work presents layouts, bills of materials, piping and instrumentation diagrams, and detailed analysesmore » of five new station designs. In the near term, delivered hydrogen results in a lower cost of hydrogen compared to on-site production via steam methane reforming or electrolysis, although the on-site production methods have other advantages. Modular station concepts including on-site production can reduce lot sizes from conventional assemble-on-site stations.« less

  12. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-10-04

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) ismore » the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is used throughout this document to describe RACM. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the DOE/NV-325, Nevada National Security Site Waste Acceptance Criteria (NNSSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, or contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, or small quantities of LLHB demolition and construction waste and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NNSSWAC.« less

  13. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    DOT National Transportation Integrated Search

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  14. Design of Buoys for Mounting Wind Turbines at Exposed Sites

    NASA Astrophysics Data System (ADS)

    Erdoğan, Beytullah; Çelıkkol, Barbaros; Swift, Robinson

    2018-04-01

    In this study, two designs for a buoy capable of supporting a 10 kW wind turbine and its tower were developed to operate at the University of New Hampshire's Center of Ocean Renewable Energy testing site located off the Isles of Shoals, New Hampshire. The buoys are to be moored by a catenary chain system. To evaluate wave response, two Froude-scaled models were constructed, tested, and compared at the Ocean Engineering wave tank at the University of New Hampshire. These buoys have been implemented and compared with wave tank measurements of the spar displacement at a reference elevation 2.44 m above the mean water level.

  15. iss012e16633

    NASA Image and Video Library

    2006-01-28

    ISS012-E-16633 (28 Jan. 2006) --- Savannah River Site, South Carolina is featured in this image photographed by an Expedition 12 crew member on the International Space Station. Situated between the South Carolina piedmont and the Atlantic Ocean, the Savannah River Site is an important part of the US Department of Energy’s nuclear program. Construction of the site – originally called the Savannah River Plant – began in 1951 for the purpose of generating radioactive materials, primarily the hydrogen isotope tritium and plutonium-239, necessary for nuclear weapons production during the Cold War. A total of five nuclear reactors occupy the central portion of the site and operated throughout 1953-1992. Following the end of the Cold War in 1991 activities at the Savannah River Site are now focused on disposal of nuclear wastes, environmental cleanup of the site itself, and development of advanced remediation technologies. The Savannah River Site is located in the Sand Hills region of South Carolina and includes an area of 800 square kilometers (300 square miles). The southern half of the Site (building clusters with reflective white rooftops) is shown. The nearby Savannah River and its tributary creeks provided a ready source of water for the nuclear reactors; to this end, two artificial lakes (“L” Lake and Par Pond) were constructed. The meandering channel of the River and its floodplain, characterized by grey-brown sediments, extends from northwest to southeast across the left portion of the image. The proximity of the River, and the permeable nature of the geological materials under laying the site (sand, clay, gravel, and carbonate rocks), necessitate extensive and ongoing environmental monitoring and cleanup efforts to reduce potential contamination of local water sources. According to NASA scientists, final remediation of wastes posing threats to surface and groundwater is scheduled to occur by 2025.

  16. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat County

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided bymore » RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.« less

  17. Effects of land use on water quality and transport of selected constituents in streams in Mecklenburg County, North Carolina, 1994–98

    USGS Publications Warehouse

    Ferrell, Gloria M.

    2001-01-01

    Transport rates for total solids, total nitrogen, total phosphorus, biochemical oxygen demand, chromium, copper, lead, nickel, and zinc during 1994–98 were computed for six stormwater-monitoring sites in Mecklenburg County, North Carolina. These six stormwater-monitoring sites were operated by the Mecklenburg County Department of Environmental Protection, in cooperation with the City of Charlotte, and are located near the mouths of major streams. Constituent transport at the six study sites generally was dominated by nonpoint sources, except for nitrogen and phosphorus at two sites located downstream from the outfalls of major municipal wastewater-treatment plants.To relate land use to constituent transport, regression equations to predict constituent yield were developed by using water-quality data from a previous study of nine stormwater-monitoring sites on small streams in Mecklenburg County. The drainage basins of these nine stormwater sites have relatively homogeneous land-use characteristics compared to the six study sites. Mean annual construction activity, based on building permit files, was estimated for all stormwater-monitoring sites and included as an explanatory variable in the regression equations. These regression equations were used to predict constituent yield for the six study sites. Predicted yields generally were in agreement with computed yields. In addition, yields were predicted by using regression equations derived from a national urban water-quality database. Yields predicted from the regional regression equations generally were about an order of magnitude lower than computed yields.Regression analysis indicated that construction activity was a major contributor to transport of the constituents evaluated in this study except for total nitrogen and biochemical oxygen demand. Transport of total nitrogen and biochemical oxygen demand was dominated by point-source contributions. The two study basins that had the largest amounts of construction activity also had the highest total solids yields (1,300 and 1,500 tons per square mile per year). The highest total phosphorus yields (3.2 and 1.7 tons per square mile per year) attributable to nonpoint sources also occurred in these basins. Concentrations of chromium, copper, lead, nickel, and zinc were positively correlated with total solids concentrations at most of the study sites (Pearson product-moment correlation >0.50). The site having the highest median concentrations of chromium, copper, and nickel also was the site having the highest computed yield for total solids.

  18. Mobilizable RDF/d-RDF burning program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niemann, K.; Campbell, J.

    1982-03-01

    The Mobilizable RDF/d-RDF Burning Program was conceived to promote the utilization of refuse-derived fuels (RDF) as a supplement to existing fossil fuel sources in industrial-sized boilers. The program explores the design, development, and eventual construction of densified-RDF (d-RDF) for use in boiler combustion testing as a supplement to stoker coal or wood wastes. The equipment would be mounted on trailers and assembled and operated at preselected sites throughout the country where approximately 750 tons of RDF would be produced and test burned in a local boiler. The equipment, to include a transportable RDF boiler metering and feed system, would thenmore » be moved and operated at two to three test sites annually. The program is intended to encourage the construction of permanent resource recovery facilities by involving local waste handling groups in operating the equipment and producing fuel, and potential local fuel users in testing the fuel in their boilers. The Mobilizable Program was developed from two separate tasks. The first task developed the concept behind the program and defined its operational and organizational structure. The second task, a follow-up to the first, was intended principally to finalize test locations, develop equipment designs and specifications, and formalize a management program. This report summarizes the principal findings of both tasks. It identifies the criteria used to identify test locations, outlines the program's management structure, presents design and performance specifications for both the fuel production equipment and boiler fuel feed systems, and provides a detailed evaluation of the parameters involved in burning RDF in industrial-sized boilers. Final conclusions and recommendations identify problem areas encountered in the program, and discuss possible future directions for such a program.« less

  19. Radioactive Air Emissions Notice of Construction for the 105-KW Basin integrated water treatment system filter vessel sparging vent

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kamberg, L.D.

    1998-02-23

    This document serves as a notice of construction (NOC), pursuant to the requirements of Washington Administrative Code (WAC) 246-247-060, and as a request for approval to construct, pursuant to 40 Code of Federal Regulations (CFR) 61.07, for the Integrated Water Treatment System (IWTS) Filter Vessel Sparging Vent at 105-KW Basin. Additionally, the following description, and references are provided as the notices of startup, pursuant to 40 CFR 61.09(a)(1) and (2) in accordance with Title 40 Code of Federal Regulations, Part 61, National Emission Standards for Hazardous Air Pollutants. The 105-K West Reactor and its associated spent nuclear fuel (SNF) storagemore » basin were constructed in the early 1950s and are located on the Hanford Site in the 100-K Area about 1,400 feet from the Columbia River. The 105-KW Basin contains 964 Metric Tons of SNF stored under water in approximately 3,800 closed canisters. This SNF has been stored for varying periods of time ranging from 8 to 17 years. The 105-KW Basin is constructed of concrete with an epoxy coating and contains approximately 1.3 million gallons of water with an asphaltic membrane beneath the pool. The IWTS, which has been described in the Radioactive Air Emissions NOC for Fuel Removal for 105-KW Basin (DOE/RL-97-28 and page changes per US Department of Energy, Richland Operations Office letter 97-EAP-814) will be used to remove radionuclides from the basin water during fuel removal operations. The purpose of the modification described herein is to provide operational flexibility for the IWTS at the 105-KW basin. The proposed modification is scheduled to begin in calendar year 1998.« less

  20. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  1. Real-time digital data-acquisition system for determining load characteristics. Volume 2: Operating, programming and maintenance instructions

    NASA Astrophysics Data System (ADS)

    Podesto, B.; Lapointe, A.; Larose, G.; Robichaud, Y.; Vaillancourt, C.

    1981-03-01

    The design and construction of a Real-Time Digital Data Acquisition System (RTDDAS) to be used in substations for on-site recording and preprocessing load response data were included. The gathered data can be partially processed on site to compute the apparent, active and reactive powers, voltage and current rms values, and instantaneous values of phase voltages and currents. On-site processing capability is provided for rapid monitoring of the field data to ensure that the test setup is suitable. Production analysis of field data is accomplished off-line on a central computer from data recorded on a dual-density (800/1600) magnetic tape which is IBM-compatible. Parallel channels of data can be recorded at a variable rate from 480 to 9000 samples per second per channel. The RTDDAS is housed in a 9.1 m (30-ft) trailer which is shielded from electromagnetic interference and protected by isolators from switching surges. The test must sometimes be performed. Information pertaining to the installation, software operation, and maintenance is presented.

  2. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  3. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  4. 10 CFR 433.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Sustainable principles for siting, design and construction... FOR NEW FEDERAL COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS § 433.6 Sustainable principles for siting, design and construction. [Reserved] ...

  5. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  6. Wildlife conservation and solar energy development in the Desert Southwest, United States

    USGS Publications Warehouse

    Lovich, Jeffrey E.; Ennen, Josua R.

    2011-01-01

    Large areas of public land are currently being permitted or evaluated for utility-scale solar energy development (USSED) in the southwestern United States, including areas with high biodiversity and protected species. However, peer-reviewed studies of the effects of USSED on wildlife are lacking. The potential effects of the construction and the eventual decommissioning of solar energy facilities include the direct mortality of wildlife; environmental impacts of fugitive dust and dust suppressants; destruction and modification of habitat, including the impacts of roads; and off-site impacts related to construction material acquisition, processing, and transportation. The potential effects of the operation and maintenance of the facilities include habitat fragmentation and barriers to gene flow, increased noise, electromagnetic field generation, microclimate alteration, pollution, water consumption, and fire. Facility design effects, the efficacy of site-selection criteria, and the cumulative effects of USSED on regional wildlife populations are unknown. Currently available peer-reviewed data are insufficient to allow a rigorous assessment of the impact of USSED on wildlife.

  7. FY94 CAG trip reports, CAG memos and other products: Volume 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-12-15

    The Yucca Mountain Site Characterization Project (YMP) of the US DOE is tasked with designing, constructing, and operating an Exploratory Studies Facility (ESF) at Yucca Mountain, Nevada. The purpose of the YMP is to provide detailed characterization of the Yucca Mountain site for the potential mined geologic repository for permanent disposal of high-level radioactive waste. Detailed characterization of properties of the site are to be conducted through a wide variety of short-term and long-term in-situ tests. Testing methods require the installation of a large number of test instruments and sensors with a variety of functions. These instruments produce analog andmore » digital data that must be collected, processed, stored, and evaluated in an attempt to predict performance of the repository. The Integrated Data and Control System (IDCS) is envisioned as a distributed data acquisition that electronically acquires and stores data from these test instruments. IDCS designers are responsible for designing and overseeing the procurement of the system, IDCS Operation and Maintenance operates and maintains the installed system, and the IDCS Data Manager is responsible for distribution of IDCS data to participants. This report is a compilation of trip reports, interoffice memos, and other memos relevant to Computer Applications Group, Inc., work on this project.« less

  8. A teleoperated system for remote site characterization

    NASA Technical Reports Server (NTRS)

    Sandness, Gerald A.; Richardson, Bradley S.; Pence, Jon

    1994-01-01

    The detection and characterization of buried objects and materials is an important step in the restoration of burial sites containing chemical and radioactive waste materials at Department of Energy (DOE) and Department of Defense (DOD) facilities. By performing these tasks with remotely controlled sensors, it is possible to obtain improved data quality and consistency as well as enhanced safety for on-site workers. Therefore, the DOE Office of Technology Development and the US Army Environmental Center have jointly supported the development of the Remote Characterization System (RCS). One of the main components of the RCS is a small remotely driven survey vehicle that can transport various combinations of geophysical and radiological sensors. Currently implemented sensors include ground-penetrating radar, magnetometers, an electromagnetic induction sensor, and a sodium iodide radiation detector. The survey vehicle was constructed predominantly of non-metallic materials to minimize its effect on the operation of its geophysical sensors. The system operator controls the vehicle from a remote, truck-mounted, base station. Video images are transmitted to the base station by a radio link to give the operator necessary visual information. Vehicle control commands, tracking information, and sensor data are transmitted between the survey vehicle and the base station by means of a radio ethernet link. Precise vehicle tracking coordinates are provided by a differential Global Positioning System (GPS).

  9. Development of GPS/A Seafloor Geodetic Network Along Japan Trench and Onset of Its Operation

    NASA Astrophysics Data System (ADS)

    Kido, M.; Fujimoto, H.; Osada, Y.; Ohta, Y.; Yamamoto, J.; Tadokoro, K.; Okuda, T.; Watanabe, T.; Nagai, S.; Kenji, Y.

    2012-12-01

    The Tohoku-oki earthquake in 2011 revealed that an M9-class giant earthquake could occur even in the old subduction zone and that coseismic slip can reach its frontal wedge, where we considered no significant stress had been accumulated in. One of the leading figure of such finding is in situ seafloor geodetic measurement, such as GPS/A technique for horizontal displacement and pressure gauge for vertical displacement. Japan Coast Guard and Japanese university group had developed several GPS/A sites near the source region of the Tohoku-oki earthquake and detected quite large coseismic movements over 20 m in there. Displacement vectors observed these sites showed systematic variation, i.e., mainly confined in the off-Miyagi area and getting larger near the trench. However, subsequent post-seismic deformation shows inexplicable distribution. In order to elucidate this complex feature, MEXT Japan has decided to construct dense and widely-extended GPS/A network along Japan trench, including deep area (~6000m). We, Tohoku and Nagoya universities, have firstly developed high-powered seafloor transponders with an omnidirectional acoustic unit that works at 6000 m deep ocean and enable acoustic ranging over 13 km slant length. In addition, using high-energy density battery, its lifetime is expected 10 years with normal operation. Secondly, we examined the optimal distribution of GPS/A sites forming a network, taken pre-existing sites into consideration. The new network consists of 20 sites (roughly four transponders at a single site and 86 transponders in total). The distribution is dense near the area of complex post-seismic deformation and extended over 400 km to cover the adjacent area of the source region, in where induced earthquake may be expected. The largest obstacle to draw network plan is seafloor topography. Because a GPS/A site is a seafloor benchmark, its installation must be on flat and locally stable spot. Since a single GPS/A site consists of three or more transponders in an area extending roughly the same dimension of its depth, flat spot is quite limited especially near the trench. The positions of the 20 sites were carefully determined using a high-definition bathymetry map. We already have constructed two sites, one of which is 5500 m depth, and successfully obtained acoustic data. In September, we will install rest of the sites (18 sites) and begin initial campaign survey. The second campaign is planned in November. We will introduce details of the network and report updated result in the talk.

  10. Ecological studies related to the construction of the Defense Waste Processing Facility on the Savannah River Site. Annual report, FY-1991 and FY-1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, D.E.; Chazel, A.C.; Pechmann, J.H.K.

    1993-06-01

    The Defense Waste Processing Facility (DWPF) was built on the Savannah River Site (SRS) during the mid-1980`s. The Savannah River Ecology Laboratory (SREL) has completed 14 years of ecological studies related to the construction of the DWPF complex. Prior to construction, the 600-acre site (S-Area) contained a Carolina bay and the headwaters of a stream. Research conducted by the SREL has focused primarily on four questions related to these wetlands: (1) Prior to construction, what fauna and flora were present at the DWPF site and at similar, yet undisturbed, alternative sites? (2) By comparing the Carolina bay at the DWPFmore » site (Sun Bay) with an undisturbed control Carolina bay (Rainbow Bay), what effect is construction having on the organisms that inhabited the DWPF site? (3) By comparing control streams with streams on the periphery of the DWPF site, what effect is construction having on the peripheral streams? (4) How effective have efforts been to lessen the impacts of construction, both with respect to erosion control measures and the construction of ``refuge ponds`` as alternative breeding sites for amphibians that formerly bred at Sun Bay? Through the long-term census-taking of biota at the DWPF site and Rainbow Bay, SREL has begun to evaluate the impact of construction on the biota and the effectiveness of mitigation efforts. Similarly, the effects of erosion from the DWPF site on the water quality of S-Area peripheral streams are being assessed. This research provides supporting data relevant to the National Environmental Policy Act (NEPA) of 1969, the Endangered Species Act of 1973, Executive Orders 11988 (Floodplain Management) and 11990 (Protection of Wetlands), and United States Department of Energy (DOE) Guidelines for Compliance with Floodplain/Wetland Environmental Review Requirements (10 CFR 1022).« less

  11. Design of turbidity controls for Oklahoma highway construction.

    DOT National Transportation Integrated Search

    2013-03-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction : industry to control the discharge of pollutants from the sites. The construction effluent guidelines or : ELGs require construction sites to reduce the p...

  12. Exploiting Multisite Gateway and pENFRUIT plasmid collection for fruit genetic engineering.

    PubMed

    Estornell, Leandro H; Granell, Antonio; Orzaez, Diego

    2012-01-01

    MultiSite Gateway cloning techniques based on homologous recombination facilitate the combinatorial assembly of basic genetic pieces (i.e., promoters, CDS, and terminators) into gene expression or gene silencing cassettes. pENFRUIT is a collection of MultiSite Triple Gateway Entry vectors dedicated to genetic engineering in fruits. It comprises a number of fruit-operating promoters as well as C-terminal tags adapted to the Gateway standard. In this way, flanking regulatory/labeling sequences can be easily Gateway-assembled with a given gene of interest for its ectopic expression or silencing in fruits. The resulting gene constructs can be analyzed in stable transgenic plants or in transient expression assays, the latter allowing fast testing of the increasing number of combinations arising from MultiSite methodology. A detailed description of the use of MultiSite cloning methodology for the assembly of pENFRUIT elements is presented.

  13. Size Matters: Penis Size and Sexual Position in Gay Porn Profiles.

    PubMed

    Brennan, Joseph

    2018-01-01

    This article combines qualitative and quantitative textual approaches to the representation of penis size and sexual position of performers in 10 of the most visited gay pornography Web sites currently in operation. Specifically, in excess of 6,900 performer profiles sourced from 10 commercial Web sites are analyzed. Textual analysis of the profile descriptions is combined with a quantitative representation of disclosed penis size and sexual position, which is presented visually by two figures. The figures confirm that these sites generally market themselves as featuring penises that are extraordinarily large and find a sample-wide correlation between smaller penis sizes (5-6.5 inches) and receptive sexual acts (bottoming), and larger (8.5-13 inches) with penetrative acts (topping). These observations are supported through the qualitative textual readings of how the performers are described on these popular sites, revealing the narratives and marketing strategies that shape the construction of popular porn brands, performers, and profitable fantasies.

  14. Phase 1 environmental report for the Advanced Neutron Source at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blasing, T.J.; Brown, R.A.; Cada, G.F.

    1992-02-01

    The US Department of Energy (DOE) has proposed the construction and operation of the Advanced Neutron Source (ANS), a 330-MW(f) reactor, at Oak Ridge National Laboratory (ORNL) to support neutron scattering and nuclear physics experiments. ANS would provide a steady-state source of neutrons that are thermalized to produce sources of hot, cold, and very coal neutrons. The use of these neutrons in ANS experiment facilities would be an essential component of national research efforts in basic materials science. Additionally, ANS capabilities would include production of transplutonium isotopes, irradiation of potential fusion and fission reactor materials, activation analysis, and production ofmore » medical and industrial isotopes such as {sup 252}Cf. Although ANS would not require licensing by the US Nuclear Regulatory Commission (NRC), DOE regards the design, construction, and operation of ANS as activities that would produce a licensable facility; that is, DOE is following the regulatory guidelines that NRC would apply if NRC were licensing the facility. Those guidelines include instructions for the preparation of an environmental report (ER), a compilation of available data and preliminary analyses regarding the environmental impacts of nuclear facility construction and operation. The ER, described and outlined in NRC Regulatory Guide 4.2, serves as a background document to facilitate the preparation of environmental impact statements (EISs). Using Regulatory Guide 4.2 as a model, this ANS ER provides analyses and information specific to the ANS site and area that can be adopted (and modified, if necessary) for the ANS EIS. The ER is being prepared in two phases. Phase 1 ER includes many of the data and analyses needed to prepare the EIS but does not include data or analyses of alternate sites or alternate technologies. Phase 2 ER will include the additional data and analyses stipulated by Regulatory Guide 4.2.« less

  15. Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico

    DTIC Science & Technology

    2014-09-01

    to house the newly formed 498th Nuclear Systems Wing. This facility will be a two-story, steel-framed structure with reinforced concrete foundation ...occurs at depths of 200 to 400 feet below ground surface . The perched aquifer is a result of infiltration of water from both man-made and natural origins...as a Sensitive Compartmented Information Facility with reinforced concrete foundation , floors, and reinforced masonry walls. The construction

  16. KSC-2014-2017

    NASA Image and Video Library

    2014-04-04

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A large crane is situated next to the ML for lifting of heavy metal beams and other construction materials. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Cory Huston

  17. KSC-2014-2273

    NASA Image and Video Library

    2014-04-22

    CAPE CANAVERAL, Fla. -- Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. Two large cranes are situated next to the ML for lifting of heavy metal beams and other construction materials. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Daniel Casper

  18. Artist Concept of Atlantis' new home

    NASA Image and Video Library

    2012-01-18

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, workers are constructing 40-foot-diameter dish antenna arrays for the Ka-Band Objects Observation and Monitoring, or Ka-BOOM system. The antennas will be part of the operations command center facility. The construction site is near the former Vertical Processing Facility, which has been demolished. The Ka-BOOM project is one of the final steps in developing the techniques to build a high power, high resolution radar system capable of becoming a Near Earth Object Early Warning System. While also capable of space communication and radio science experiments, developing radar applications is the primary focus of the arrays. Photo credit: NASA/ Ben Smegelsky

  19. Computer coordination of limb motion for locomotion of a multiple-armed robot for space assembly

    NASA Technical Reports Server (NTRS)

    Klein, C. A.; Patterson, M. R.

    1982-01-01

    Consideration is given to a possible robotic system for the construction of large space structures, which may be described as a multiple general purpose arm manipulator vehicle that can walk over the structure under construction to a given site for further work. A description is presented of the locomotion of such a vehicle, modeling its arms in terms of a currently available industrial manipulator. It is noted that for whatever maximum speed of operation is chosen, rapid changes in robot velocity create situations in which already-selected handholds are no longer practical. A step is added to the 'free gait' walking algorithm in order to solve this problem.

  20. Hanford Quarter Seismic Report - 98C Seismicity On and Near the Hanford Site, Pasco Basin, Washington: April 1, 1998 Through June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DC Hartshorn, SP Reidel, AC Rohay

    1998-10-23

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. The staff also locates aud identifies sources of seismic activity and monitors changes in the hi~orical pattern of seismic activity at the Hanford Site. The data are. compiled archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event of zinmore » earthquake on the Hanford Site. The HSN and Ihe Eastern Washington Regional Network (EN/RN) consist-of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The operational rate for the third quarter of FY 1998 for stations in the HSN was 99.99%. The operational rate for the third quarter of FY 1998 for stations of the EWRN was 99.95%. For the third quarter of FY 1998, the acquisition computer triggered 133 times. Of these triggers 11 were local earthquakes: 5 (45Yo) in the Columbia River Basalt Group, 2(1 8%) in the pre-basalt sediments, and 4 (36%) in the crystalline basement. The geologic and tectonic environments where these earthquakes occurred are discussed in this report.« less

  1. Hanford Quarter Seismic Report - 98C Seismicity On and Near the Hanford Site, Pasco Basin, Washington: April 1, 1998 Through June 30, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DC Hartshorn, SP Reidel, AC Rohay.

    1998-10-23

    Hanford Seismic Monitoring provides an uninterrupted collection of high-quality raw and processed seismic data from the Hanford Seismic Network (HSN) for the U.S. Department of Energy and its contractors. The staff also locates aud identifies sources of seismic activity and monitors changes in the hi orical pattern of seismic activity at the Hanford Site. The data are. compiled archived, and published for use by the Hanford Site for waste management Natural Phenomena Hazards assessments, and engineering design and construction. In addition, the seismic monitoring organization works with the Hanford Site Emergency Services Organization to provide assistance in the event ofmore » zin earthquake on the Hanford Site. The HSN and Ihe Eastern Washington Regional Network (EN/RN) consist-of 42 individual sensor sites and 15 radio relay sites maintained by the Hanford Seismic Monitoring staff. The operational rate for the third quarter of FY 1998 for stations in the HSN was 99.99%. The operational rate for the third quarter of FY 1998 for stations of the EWRN was 99.95%. For the third quarter of FY 1998, the acquisition computer triggered 133 times. Of these triggers 11 were local earthquakes: 5 (45Yo) in the Columbia River Basalt Group, 2(1 8%) in the pre-basalt sediments, and 4 (36%) in the crystalline basement. The geologic and tectonic environments where these earthquakes occurred are discussed in this report.« less

  2. Path Length Fluctuations Derived from Site Testing Interferometer Data

    NASA Technical Reports Server (NTRS)

    Acosta, Roberto J.; Nessel, James A.; Morse, Jacquelynne R.

    2010-01-01

    To evaluate possible sites for NASA's proposed Ka-band antenna array, the NASA Glenn Research Center has constructed atmospheric phase monitors (APM) which directly measure the tropospheric phase stability. These instruments observe an unmodulated 20.2 GHz beacon signal broadcast from a geostationary satellite (Anik F2) and measure the phase difference between the signals received by the two antennas. Two APM's have been deployed, one at the NASA Deep Space Network (DSN) Tracking Complex in Goldstone, California, and the other at the NASA White Sands Complex, in Las Cruces, New Mexico. Two station-years of atmospheric phase fluctuation data have been collected at Goldstone since operations commenced in May 2007 and 0.5 station-years of data have been collected at White Sands since operations began February 2009. With identical instruments operating simultaneously, we can directly compare the phase stability at the two sites. Phase stability is analyzed statistically in terms of the root-mean-square (rms) of the tropospheric path length fluctuations over 10 min blocks. Correlation between surface wind speed and relative humidity with interferometer phase are discussed. For 2 years, the path length fluctuations at the DSN site in Goldstone, California, have been better than 757 micrometer (with reference to a 300 m baseline and to Zenith) for 90 percent of the time. For the 6 months of data collected at White Sands, New Mexico, the path length fluctuations have been better than 830 micrometers (with reference to a 300 m baseline and to Zenith) for 90 percent of the time. This type of data analysis, as well as many other site quality characteristics (e.g., rain attenuation, infrastructure, etc.), will be used to determine the suitability of both sites for NASA s future communication services at Ka-band using an array of antennas.

  3. Submicron particle monitoring of paving and related road construction operations.

    PubMed

    Freund, Alice; Zuckerman, Norman; Baum, Lisa; Milek, Debra

    2012-01-01

    This study identified activities and sources that contribute to ultrafine and other submicron particle exposure that could trigger respiratory symptoms in highway repair workers. Submicron particle monitoring was conducted for paving, milling, and pothole repair operations in a major metropolitan area where several highway repair workers were identified as symptomatic for respiratory illness following exposures at the 2001 World Trade Center disaster site. Exposure assessments were conducted for eight trades involved in road construction using a TSI P-Trak portable condensation particle counter. Direct readings near the workers' breathing zones and observations of activities and potential sources were logged on 7 days on 27 workers using four different models of pavers and two types of millers. Average worker exposure levels ranged from 2 to 3 times background during paving and from 1 to 4 times background during milling. During asphalt paving, average personal exposures to submicron particulates were 25,000-60,000, 28,000-70,000, and 23,000-37,000 particles/ cm(3) for paver operators, screed operators, and rakers, respectively. Average personal exposures during milling were 19,000-111,000, 28,000-81,000, and 19,000 particles/cm(3) for the large miller operators, miller screed operators, and raker, respectively. Personal peak exposures were measured up to 467,000 and 455,000 particles/cm(3) in paving and milling, respectively. Several sources of submicron particles were identified. These included the diesel and electric fired screed heaters; engine exhaust from diesel powered construction vehicles passing by or idling; raking, dumping, and paving of asphalt; exhaust from the hotbox heater; pavement dust or fumes from milling operations, especially when the large miller started and stopped; and secondhand cigarette smoke. To reduce the potential for health effects in workers, over 40 recommendations were made to control exposures, including improved maintenance of paver ventilation systems; diesel fume engineering controls; reduced idling; provision of cabs for the operators; and improved dust suppression systems on the milling machine.

  4. Factors affecting unsafe behavior in construction projects: development and validation of a new questionnaire.

    PubMed

    Asilian-Mahabadi, Hassan; Khosravi, Yahya; Hassanzadeh-Rangi, Narmin; Hajizadeh, Ebrahim; Behzadan, Amir H

    2018-02-05

    Occupational safety in general, and construction safety in particular, is a complex phenomenon. This study was designed to develop a new valid measure to evaluate factors affecting unsafe behavior in the construction industry. A new questionnaire was generated from qualitative research according to the principles of grounded theory. Key measurement properties (face validity, content validity, construct validity, reliability and discriminative validity) were examined using qualitative and quantitative approaches. The receiver operating characteristic curve was used to estimate the discriminating power and the optimal cutoff score. Construct validity revealed an interpretable 12-factor structure which explained 61.87% of variance. Good internal consistency (Cronbach's α = 0.94) and stability (intra-class correlation coefficient = 0.93) were found for the new instrument. The area under the curve, sensitivity and specificity were 0.80, 0.80 and 0.75, respectively. The new instrument also discriminated safety performance among the construction sites with different workers' accident histories (F = 6.40, p < 0.05). The new instrument appears to be a valid, reliable and sensitive instrument that will contribute to investigating the root causes of workers' unsafe behaviors, thus promoting safety performance in the construction industry.

  5. Energy benchmarking in wastewater treatment plants: the importance of site operation and layout.

    PubMed

    Belloir, C; Stanford, C; Soares, A

    2015-01-01

    Energy benchmarking is a powerful tool in the optimization of wastewater treatment plants (WWTPs) in helping to reduce costs and greenhouse gas emissions. Traditionally, energy benchmarking methods focused solely on reporting electricity consumption, however, recent developments in this area have led to the inclusion of other types of energy, including electrical, manual, chemical and mechanical consumptions that can be expressed in kWh/m3. In this study, two full-scale WWTPs were benchmarked, both incorporated preliminary, secondary (oxidation ditch) and tertiary treatment processes, Site 1 also had an additional primary treatment step. The results indicated that Site 1 required 2.32 kWh/m3 against 0.98 kWh/m3 for Site 2. Aeration presented the highest energy consumption for both sites with 2.08 kWh/m3 required for Site 1 and 0.91 kWh/m3 in Site 2. The mechanical energy represented the second biggest consumption for Site 1 (9%, 0.212 kWh/m3) and chemical input was significant in Site 2 (4.1%, 0.026 kWh/m3). The analysis of the results indicated that Site 2 could be optimized by constructing a primary settling tank that would reduce the biochemical oxygen demand, total suspended solids and NH4 loads to the oxidation ditch by 55%, 75% and 12%, respectively, and at the same time reduce the aeration requirements by 49%. This study demonstrated that the effectiveness of the energy benchmarking exercise in identifying the highest energy-consuming assets, nevertheless it points out the need to develop a holistic overview of the WWTP and the need to include parameters such as effluent quality, site operation and plant layout to allow adequate benchmarking.

  6. Overview and status of the Giant Magellan Telescope Project

    NASA Astrophysics Data System (ADS)

    McCarthy, Patrick J.; Fanson, James; Bernstein, Rebecca; Ashby, David; Bigelow, Bruce; Boyadjian, Nune; Bouchez, Antonin; Chauvin, Eric; Donoso, Eduardo; Filgueira, Jose; Goodrich, Robert; Groark, Frank; Jacoby, George; Pearce, Eric

    2016-08-01

    The Giant Magellan Telescope Project is in the construction phase. Production of the primary mirror segments is underway with four of the seven required 8.4m mirrors at various stages of completion and materials purchased for segments five and six. Development of the infrastructure at the GMT site at Las Campanas is nearing completion. Power, water, and data connections sufficient to support the construction of the telescope and enclosure are in place and roads to the summit have been widened and graded to support transportation of large and heavy loads. Construction pads for the support buildings have been graded and the construction residence is being installed. A small number of issues need to be resolved before the final design of the telescope structure and enclosure can proceed and the GMT team is collecting the required inputs to the decision making process. Prototyping activities targeted at the active and adaptive optics systems are allowing us to finalize designs before large scale production of components begins. Our technically driven schedule calls for the telescope to be assembled on site in 2022 and to be ready to receive a subset of the primary and secondary mirror optics late in the year. The end date for the project is coupled to the delivery of the final primary mirror segments and the adaptive secondary mirrors that support adaptive optics operations.

  7. Development of ergonomics audits for bagging, haul truck and maintenance and repair operations in mining.

    PubMed

    Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G

    2017-12-01

    The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.

  8. Millimeter and submillimeter observations from the Atacama plateau and high altitude balloons

    NASA Astrophysics Data System (ADS)

    Devlin, Mark

    2002-05-01

    A new generation of ground-based and sub-orbital platforms will be operational in the next few years. These telescopes will operate from high sites in Chile and Antarctica, and airborne platforms where the atmosphere is transparent enough to allow sensitive measurements in the millimeter and submillimeter bands. The telescopes will employ state-of-the-art instrumentation including large format bolometer arrays and spectrometers. I will discuss the results of our observations in the Atacama region of Chile (MAT/TOCO), our future observations on the Balloon-borne Large Aperture Submillimeter Telescope (BLAST) now under construction, and our proposed Atacama Cosmology Telescope (ACT). .

  9. Discussion of Planning and Operating of Chongming Qianwei Village's Nongjiale tourism site

    NASA Astrophysics Data System (ADS)

    Guo, Qingqing; Liu, Min

    According to the sufficient market research the paper put forward the Construction and operation of Chongming Qianwei village Nongjiale tour website completed the Building program of this Business Website. Through needs analysis and feasibility analysis, this paper proposed business model for the target system, transaction mode, revenue model and competitive edge. Opening of the bridge which contact Shanghai and Chongming, coming of the shanghai expo; will bring the growth of passenger traffic of chongming's tourism industry. This article is based on this background, discussing the exploitation and plan of tour website of ChongMing, Enhancing the Popularity and Competitiveness of Chongming's Tourism.

  10. A science and technology initiative within the office of civilian radioactive waste management

    USGS Publications Warehouse

    Budnitz, R.J.; Kiess, T.E.; Peters, M.; Duncan, D.

    2003-01-01

    In 2002, by following a national decision-making process that had been specified in the 1982 Nuclear Waste Policy Act, Yucca Mountain (YM) was designated as the site for the nation's geologic repository for commercial spent nuclear fuel (SNF). The U.S. Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) must now obtain regulatory approval to construct and operate a repository there, and to develop transportation and infrastructure needed to support operations. The OCRWM has also recently begun a separate Science and Technology (S&T) initiative, whose purposes, beginnings, current projects, and future plans are described here.

  11. The Differing Site Conditions Clause: Time for a Change

    DTIC Science & Technology

    1990-09-30

    the character provided for in the contract. The provision of the standard construction contract utilized by agencies of the Federal Government which...unanticipated conditions otherwise attendant upon the performance of construction work.’ Differing site conditions pose a major concern to all I McNulty, "Changed...Conditions (Differing Site Conditions) and Misrepresentations Under Government Construction Contracts" in Construction Contract Changes, Changed

  12. Assessment of karst activity at highway construction sites using the electrical resistivity method (Greene and Jefferson Counties, Missouri).

    DOT National Transportation Integrated Search

    2006-11-01

    Two-dimensional (2-D) electrical resistivity data were acquired across and in proximity to active sinkholes at two Missouri : Department of Transportation (MoDOT) highway-construction sites. Construction site #1 is located in Greene County, Missouri;...

  13. 48 CFR 49.105-4 - Cleanup of construction site.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cleanup of construction site. 49.105-4 Section 49.105-4 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.105-4 Cleanup of construction site. In...

  14. Childhood leukaemia and ordnance factories in west Cumbria during the Second World War.

    PubMed

    Kinlen, L

    2006-07-03

    Much evidence has accumulated that childhood leukaemia (CL) is a rare response to a common, but unidentified, infection and in particular that situations involving the unusual mixing of urban and rural groups (approximating to, respectively, groups infected with, and susceptible to, the relevant microorganism) can produce localised epidemics with consequent increases of the infrequent leukaemic complication. During the Second World War, explosives production factories were built and operated at Drigg and Sellafield, and a shell filling factory at Bootle, in west Cumbria, England, requiring substantial numbers of construction workers to be brought into this remote and isolated area. Following the design of an earlier study of CL near large (post-war) rural construction sites, mortality from this disease was investigated with the help of the Office of National Statistics, in the area around these Cumbrian factories where local workers largely lived, during the construction period and with particular reference to the overlapping construction and operational phase when the mixing of local and migrant workers would have been greatest. An excess of leukaemia deaths at ages 1-14 was found during the construction period (observed 3; observed/expected (O/E) 2.2, 95% confidence interval (CI): 0.6, 6.0), which was more marked and statistically significant during the overlap with operations (O 3; O/E 4.5, 95% CI: 1.1, 12.2), especially at ages 1-4 (O 2; O/E 7.1, CI: 1.2, 23.6). A previous investigation did not detect this excess because it considered only a small part of west Cumbria that omitted the communities where most of the workforce lived, having incorrectly attributed the post-war expansion of the village of Seascale (situated between Drigg and Sellafield) to the wartime ordnance factories. The present findings are consistent with the results of the earlier study of rural construction projects and with the general evidence that marked rural-urban population mixing increases the risk of CL.

  15. Childhood leukaemia and ordnance factories in west Cumbria during the Second World War

    PubMed Central

    Kinlen, L

    2006-01-01

    Much evidence has accumulated that childhood leukaemia (CL) is a rare response to a common, but unidentified, infection and in particular that situations involving the unusual mixing of urban and rural groups (approximating to, respectively, groups infected with, and susceptible to, the relevant microorganism) can produce localised epidemics with consequent increases of the infrequent leukaemic complication. During the Second World War, explosives production factories were built and operated at Drigg and Sellafield, and a shell filling factory at Bootle, in west Cumbria, England, requiring substantial numbers of construction workers to be brought into this remote and isolated area. Following the design of an earlier study of CL near large (post-war) rural construction sites, mortality from this disease was investigated with the help of the Office of National Statistics, in the area around these Cumbrian factories where local workers largely lived, during the construction period and with particular reference to the overlapping construction and operational phase when the mixing of local and migrant workers would have been greatest. An excess of leukaemia deaths at ages 1–14 was found during the construction period (observed 3; observed/expected (O/E) 2.2, 95% confidence interval (CI): 0.6, 6.0), which was more marked and statistically significant during the overlap with operations (O 3; O/E 4.5, 95% CI: 1.1, 12.2), especially at ages 1–4 (O 2; O/E 7.1, CI: 1.2, 23.6). A previous investigation did not detect this excess because it considered only a small part of west Cumbria that omitted the communities where most of the workforce lived, having incorrectly attributed the post-war expansion of the village of Seascale (situated between Drigg and Sellafield) to the wartime ordnance factories. The present findings are consistent with the results of the earlier study of rural construction projects and with the general evidence that marked rural–urban population mixing increases the risk of CL. PMID:16755299

  16. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  17. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  18. 10 CFR 435.6 - Sustainable principles for siting, design and construction. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Sustainable principles for siting, design and construction. [Reserved] 435.6 Section 435.6 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ENERGY EFFICIENCY STANDARDS...-Rise Residential Buildings. § 435.6 Sustainable principles for siting, design and construction...

  19. 75 FR 879 - National Semiconductor Corporation Arlington Manufacturing Site Including On-Site Leased Workers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... Foods, Allied Barton Security, ASIL, ASML and Construction Mechanical Systems Arlington, TX; Amended... leased workers from ASML and Construction Mechanical Systems were employed on-site at the Arlington... Department is amending the certification to include workers leased from ASML and Construction Mechanical...

  20. A case study on the feasibility and performance of an UWB-AoA real time location system for resources management of civil construction projects

    NASA Astrophysics Data System (ADS)

    Mok, Esmond; Xia, Linyuan; Retscher, Guenther; Tian, Hui

    2010-06-01

    The application of integrated satellite and modern wireless positioning technologies for ubiquitous real-time resources management in large scale civil engineering projects can greatly optimize the time and cost in the construction process, and is now the trend for modern construction project management. As the outdoor conditions of most civil construction sites are open to sky, satellite positioning with the popularly used Global Positioning System (GPS) has been proved to be very efficient and effective. However, the condition in indoor and underground construction site is very complicated due to the fact that different construction activities would be carried out in different congested areas, involving heavy construction plant, equipment, professionals and technical personnel. Nowadays different emerging technologies such as Wi-Fi and ZigBee can be adopted for position and tracking in indoor environments. Nevertheless, under the very complicated construction site conditions these technologies may fail due to movement of human resources and construction plant, variation of metrological conditions, and serious multipath effects of signals. It is considered that Ultra Wide Band (UWB) technology is more suitable for indoor construction site environments. In this paper, a case study on the attempt of integrating GPS with Ubisense Real-time Location System (RTLS) for resources management in an underground railway construction site is discussed. Laboratory and field tests have shown that the RTLS can provide better resources management capability in terms of positioning accuracy and stability than Wi-Fi and ZigBee technologies under complicated construction environments. The test results show that the system can normally achieve better than 15 cm accuracy, and better than 1 m under adverse geometrical site condition. However, the high instrumental set up cost and the requirement for high quality data transmission cable for high precision time synchronization between sensors may deter wide application of similar system for resources management in construction sites.

  1. Harmonic analyses of stream temperatures in the Upper Colorado River Basin

    USGS Publications Warehouse

    Steele, T.D.

    1985-01-01

    Harmonic analyses were made for available daily water-temperature records for 36 measurement sites on major streams in the Upper Colorado River Basin and for 14 measurement sites on streams in the Piceance structural basin. Generally (88 percent of the station years analyzed), more than 80 percent of the annual variability of temperatures of streams in the Upper Colorado River Basin was explained by the simple-harmonic function. Significant trends were determined for 6 of the 26 site records having 8 years or more record. In most cases, these trends resulted from construction and operation of upstream surface-water impoundments occurring during the period of record. Regional analysis of water-temperature characteristics at the 14 streamflow sites in the Piceance structural basin indicated similarities in water-temperature characteristics for a small range of measurement-site elevations. Evaluation of information content of the daily records indicated that less-than-daily measurement intervals should be considered, resulting in substantial savings in measurement and data-processing costs. (USGS)

  2. Satellite Power System. Concept development and evaluation program, volume 6: Construction and operations

    NASA Technical Reports Server (NTRS)

    Benson, H.; Jenkins, L. M.

    1981-01-01

    The construction, operation, and maintenance requirements for a solar power satellite, including the space and ground systems, are reviewed. The basic construction guidelines are explained, and construction location options are discussed. The space construction tasks, equipment, and base configurations are discussed together with the operations required to place a solar power satellite in geosynchronous orbit. A rectenna construction technique is explained, and operation with the grid is defined. Maintenance requirements are summarized for the entire system. Key technology issues required for solar power satellite construction operations are defined.

  3. Engineering geology studies in the National Petroleum Reserve, Alaska

    USGS Publications Warehouse

    Kachadoorian, Reuben; Crory, F.E.

    1984-01-01

    Engineering geology studies were conducted in direct support of the exploration program in the National Petroleum Reserve, Alaska. The studies included laboratory and field tests and observations to address design and construction problems of airfields, roads, drill pads and foundations, and to evaluate their actual performance. Permafrost containing large amounts of near surface ground ice as wedges, masses, and intergranular ice, required that all construction activity not disturb the thermal regime of the ground surface, which could lead to thaw of permafrost and ground subsidence. Summer activity, therefore was not allowable, yet the winter climate was so harsh that winter work was slow and inefficient. To allow summer operations at well sites planned for all year activity, it was necessary to adapt existing techniques for arctic construction and to devise new ones. The design and construction of facilities at the deep exploration wells at Inigok, Tunalik, and Lisburne posed the greatest challenge. These sites, requiring a year or more to drill, could only be attempted if continuous access to drilling and logistic supplies could be assured throughout the year, including the possibility of bringing in another drill rig, in the event of a blowout. Thus all-seasons airstrips were required at these wells. Sufficient quantities of local gravel were not readily available at the Inigok and Tunalik sites to construct the airstrips with the required 6 feet or more of gravel to prevent the underlying permafrost from thawing. Therefore, insulation was used to maintain the subbase of local sands in a continuously frozen state, which in turn was overlain by 15 inches of gravel or sandy gravel. Tests at the U.S. Army Waterways Experimental Station defined the minimum thickness of gravel required above the insulation to provide the desired bearing capacity for the C-130 type aircraft without crushing the insulation. Field testing also included the evaluation of another design option, using military landing mat underlain by insulation. Temperature recording devices were installed beneath the landing mat test sections, insulated runways, roads, drill pads, and reserve pits, to monitor the actual conditions and confirm the design assumptions. Investigations of thaw-settlement, erosion, and revegetation of all areas affected by construction were also conducted in anticipation of abandoning the sites, or, upgrading the facilities in the event the design life was extended.

  4. Community Involvement as an Effective Institutional Control at the Weldon Spring Site, a U.S. Department of Energy Office of Legacy Management Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deyo, Y.E.; Pauling, T.

    2006-07-01

    The U.S. Department of Energy (DOE) Weldon Spring Site Remedial Action Project (WSSRAP) was conducted for the purpose of remediating a portion of a former trinitrotoluene and dinitrotoluene production plant that was operational from 1941 to 1945 and a former uranium refinery that was operational from 1957 to 1966. Surface remediation activities concluded in 2001 with the completion of a 45-acre (.18 square kilometer) on-site engineered disposal facility. Long-term surveillance and maintenance activities at the site were officially transferred to the DOE Office of Legacy Management in 2003. The Weldon Spring Site is located within the St. Louis, Missouri, metropolitanmore » area (population 3 million). DOE's close relationship with surrounding land owners created a need for innovative solutions to long-term surveillance and maintenance issues at the site. Through a Secretarial proclamation, a plan was established for development of a comprehensive public involvement and education program. This program would act as an institutional control to communicate the historical legacy of the site and would make information available about contamination present at the site to guide people in making decisions about appropriate site activities. In August 2002, the Weldon Spring Site Interpretive Center opened to the public with exhibits about the history of the area, the remediation work that was completed, and a site information repository that is available to visitors. In addition, the Hamburg Trail for hiking and biking was constructed as a joint DOE/MDC effort. The 8-mile trail travels through both DOE and MDC property; a series of historical markers posted along its length to communicate the history of the area and the remediation work that was done as part of WSSRAP activities. A ramp and viewing platform with informational plaques were constructed on the disposal cell to provide an additional mechanism for public education. With a basic marketing program, site visitor-ship has been steadily increasing. In 2005, approximately 15,400 visitors were associated with Interpretive Center operations and outreach activities. Science-oriented educational programs that directly relate to past remediation activities and present long-term surveillance and maintenance issues have been developed and are presented to St. Louis area school groups and other community-based organizations. Other innovative programs have been developed to address daily maintenance issues at the site and to promote beneficial community re-use of the property. Approximately 30,000 square feet of the former Administration Building has been transferred through a use-permit to Lindenwood University, a local institution with a total enrollment of about 12,000 students. Lindenwood is establishing a satellite college campus in the building in exchange for providing basic maintenance and payment of utilities for both the Administration Building and Interpretive Center. A volunteer program developed to address maintenance of the native plant gardens that surround the Interpretive Center has a current enrollment of approximately 25 volunteers. Another volunteer group of prairie ecosystem experts has been meeting regularly for the last 3 years to assist the site in long-term management of the established prairie surrounding the disposal cell. Public support of these community involvement activities at the site is strong. DOE has worked closely with the Weldon Spring Citizens Commission in developing the concepts for this approach and the Commission has helped promote these activities within the community. It is expected that continued public education in this manner will only serve to strengthen the institutional control commitments at the Weldon Spring Site. (authors)« less

  5. Construction of 3.6m ARIES telescope enclosure with eccentric pier at Devasthal, Nainital

    NASA Astrophysics Data System (ADS)

    Bangia, Tarun

    Space optimized enclosure with eccentric pier for 3.6m ARIES telescope presents construction challenges at the unique observing site of Devasthal, Nainital, India. Enclosure comprises of about 16.5m diameter and 14m high insulated steel framed cylindrical dome rotating on a 14m high stationery dome supporting structure and a 24m × 12m extension structure building for accommodating aluminizing plant and ventilation system etc. Great deal of manual and mechanical excavation was carried out at the rocky site using rock breaking and JCB machines. Foundation bolts for columns of dome supporting structure and extension structure building were grouted after alignment with total station. A 7m diameter hollow cylindrical pier isolated from other structures and 1.85m eccentric with dome center designed due to space limitation at site is being casted for mounting 150 MT mass of the largest 3.6m telescope in the country. A 7m diameter template was fabricated for 3.6m pier top. Most of enclosure components are manufactured and tested in works before assembly/erection at site. Dome drive was tested with dummy loads using VVVF drive with 6 drive and 12 idler wheel assemblies at works to simulate dome weight and smooth operation before erection at site. A 4.2m wide motorized windscreen is being manufactured with a special grade synthetic fabric to withstand wind speed up to 15m/s.

  6. The Association Between Operating Room Personnel and Turnover With Surgical Site Infection in More Than 12 000 Neurosurgical Cases.

    PubMed

    Wathen, Connor; Kshettry, Varun R; Krishnaney, Ajit; Gordon, Steven M; Fraser, Thomas; Benzel, Edward C; Modic, Michael T; Butler, Sam; Machado, Andre G

    2016-12-01

    Surgical site infection (SSI) contributes significantly to postoperative morbidity and mortality and greatly increases the cost of care. To identify the impact of workflow and personnel-related risk factors contributing to the incidence of SSIs in a large sample of neurological surgeries. Data were obtained using an enterprisewide electronic health record system, operating room, and anesthesia records for neurological procedures conducted between January 1, 2009, and November 30, 2012. SSI data were obtained from prospective surveillance by infection preventionists using Centers for Disease Control and Prevention definitions. A multivariate model was constructed and refined using backward elimination logistic regression methods. The analysis included 12 528 procedures. Most cases were elective (94.5%), and the average procedure length was 4.8 hours. The average number of people present in the operating room at any time during the procedure was 10.0. The overall infection rate was 2.3%. Patient body mass index (odds ratio, 1.03; 95% confidence interval [CI], 1.01-1.04) and sex (odds ratio, 1.36; 95% CI, 1.07-1.72) as well as procedure length (odds ratio, 1.19 per additional hour; 95% CI, 1.15-1.23) and nursing staff turnovers (odds ratio, 1.095 per additional turnover; 95% CI, 1.02-1.21) were significantly correlated with the risk of SSI. This study found that patient body mass index and male sex were associated with an increased risk of SSI. Operating room personnel turnover, a modifiable, work flow-related factor, was an independent variable positively correlated with SSI. This study suggests that efforts to reduce operating room turnover may be effective in preventing SSI. OR, operating roomSSI, surgical site infection.

  7. System concepts for a large UV/optical/IR telescope on the moon

    NASA Technical Reports Server (NTRS)

    Nein, Max E.; Davis, Billy

    1991-01-01

    To assess the systems and technological requirements for constructing lunar telescopes in conjunction with the buildup of a lunar base for scientific exploration and as a waypoint for travel to Mars, the NASA Marshall Space Flight Center conducted concept studies of a 16-m-aperture large lunar telescope (LLT) and a 4-m-aperture precursor telescope, both operating in the UV/visible/IR spectral region. The feasibility of constructing a large telescope on the lunar surface is assessed, and its systems and subsystems are analyzed. Telescope site selection, environmental effects, and launch and assembly scenarios are also evaluated. It is argued that key technical drivers for the LLT must be tested in situ by precursor telescopes to evaluate such areas as the operations and long-term reliability of active optics, radiation protection of instruments, lunar dust mitigation, and thermal shielding of the telescope systems. For a manned lunar outpost or an LLT to become a reality, a low-cost dependable transportation system must be developed.

  8. Nuclear power plant 5,000 to 10,000 kilowatts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of this proposal is to present a suggested program for the development of an Aqueous Homogeneous Reactor Power Plant for the production of power in the 5000 to 10,000 kilowatt range under the terms of the Atomic Energy Commission's invitation of September 21, 1955. It envisions a research and development program prior to finalizing fabricating commitments of full scale components for the purpose of proving mechanical and hydraulic operating and chemical processing feasibility with the expectation that such preliminary effort will assure the contruction of the reactor at the lowest cost and successful operation at the earliest date.more » It proposes the construction of a reactor for an eventual net electrical output of ten megawatts but initially in conjunction with a five megawatt turbo-generating unit. This unit would be constructed at the site of the existing Hersey diesel generating plant of the Wolverine Electric Cooperative approximately ten miles north of Big Rapids, Michigan.« less

  9. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    PubMed

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  10. Auditing of suppliers as the requirement of quality management systems in construction

    NASA Astrophysics Data System (ADS)

    Harasymiuk, Jolanta; Barski, Janusz

    2017-07-01

    The choice of a supplier of construction materials can be important factor of increase or reduction of building works costs. Construction materials present from 40 for 70% of investment task depending on kind of works being provided for realization. There is necessity of estimate of suppliers from the point of view of effectiveness of construction undertaking and necessity from the point of view of conformity of taken operation by executives of construction job and objects within the confines of systems of managements quality being initiated in their organizations. The estimate of suppliers of construction materials and subexecutives of special works is formal requirement in quality management systems, which meets the requirements of the ISO 9001 standard. The aim of this paper is to show possibilities of making use of anaudit for estimate of credibility and reliability of the supplier of construction materials. The article describes kinds of audits, that were carried in quality management systems, with particular taking into consideration audits called as second-site. One characterizes the estimate criterions of qualitative ability and method of choice of the supplier of construction materials. The paper shows also propositions of exemplary questions, that would be estimated in audit process, the way of conducting of this estimate and conditionality of estimate.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, Kevin; Anasti, William; Fang, Yichuan

    The main purpose of this project is to look at technologies and philosophies that would help reduce the costs of an Integrated Gasification Combined Cycle (IGCC) plant, increase its availability or do both. GE’s approach to this problem is to consider options in three different areas: 1) technology evaluations and development; 2) constructability approaches; and 3) design and operation methodologies. Five separate tasks were identified that fall under the three areas: Task 2 – Integrated Operations Philosophy; Task 3 – Slip Forming of IGCC Components; Task 4 – Modularization of IGCC Components; Task 5 – Fouling Removal; and Task 6more » – Improved Slag Handling. Overall, this project produced results on many fronts. Some of the ideas could be utilized immediately by those seeking to build an IGCC plant in the near future. These include the considerations from the Integrated Operations Philosophy task and the different construction techniques of Slip Forming and Modularization (especially if the proposed site is in a remote location or has a lack of a skilled workforce). Other results include ideas for promising technologies that require further development and testing to realize their full potential and be available for commercial operation. In both areas GE considers this project to be a success in identifying areas outside the core IGCC plant systems that are ripe for cost reduction and ity improvement opportunities.« less

  12. Cheap electricity from French tides

    NASA Astrophysics Data System (ADS)

    Andre, H.

    1980-02-01

    A tidal power plant built in Saint-Malo, France is examined, and some of the problems that have resulted in recent years are analyzed. These include mechanical problems due to turbine runner-blade seal failure and electrical problems involving electroerosion and structural station difficulties. the effects of tidal power plants on the environment are discussed, and it is noted that all possible side effects of the operations are very limited. Attention is given to the basic requirements for constructing power sites.

  13. Finding of No Significant Impact (FONSI): Environmental Assessment of the Farish Recreation Area Observatory and Cabin Construction

    DTIC Science & Technology

    2011-12-21

    by low-density home sites and ranchettes. Private lands around Farish include a fishing resort named Carroll Lakes, ranching operations to the...night sky and make measurements from Farish. In addition, the new recreational cabins would not be built. Without additional lodging facilities at... measures described in the EA and incorporated into the Proposed Actions are generally required by laws, regulations or USAF policies and are adopted

  14. Design criteria for a high energy Compton Camera and possible application to targeted cancer therapy

    NASA Astrophysics Data System (ADS)

    Conka Nurdan, T.; Nurdan, K.; Brill, A. B.; Walenta, A. H.

    2015-07-01

    The proposed research focuses on the design criteria for a Compton Camera with high spatial resolution and sensitivity, operating at high gamma energies and its possible application for molecular imaging. This application is mainly on the detection and visualization of the pharmacokinetics of tumor targeting substances specific for particular cancer sites. Expected high resolution (< 0.5 mm) permits monitoring the pharmacokinetics of labeled gene constructs in vivo in small animals with a human tumor xenograft which is one of the first steps in evaluating the potential utility of a candidate gene. The additional benefit of high sensitivity detection will be improved cancer treatment strategies in patients based on the use of specific molecules binding to cancer sites for early detection of tumors and identifying metastasis, monitoring drug delivery and radionuclide therapy for optimum cell killing at the tumor site. This new technology can provide high resolution, high sensitivity imaging of a wide range of gamma energies and will significantly extend the range of radiotracers that can be investigated and used clinically. The small and compact construction of the proposed camera system allows flexible application which will be particularly useful for monitoring residual tumor around the resection site during surgery. It is also envisaged as able to test the performance of new drug/gene-based therapies in vitro and in vivo for tumor targeting efficacy using automatic large scale screening methods.

  15. Environmental Assessment for Central Campus Complex John F. Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Dankert, Donald

    2013-01-01

    This Environmental Assessment addresses the Proposed Action to consolidate multiple facilities in the Kennedy Space Center (KSC) Industrial Area by constructing two new buildings in the existing headquarters area between NASA Parkway, 3rd Street, C Avenue, and D Avenue. Under the Proposed Action, the historic Headquarters Building will be demolished and a new building will be constructed closer to the Operations and Checkout Building by centering it on D A venue (Hunton Brady Architects, P A and Jones Edmunds and Associates, Inc. 2011). This option was selected from a group of 15 initial sketches as the most viable option during a Central Campus Complex Siting Study completed in February 2011. A No-Action Alternative is also presented in which no demolition or construction of new facilities would occur. Implementing the Proposed Action will have major impacts to cultural resources, while the remaining environmental impacts will be minor.

  16. Native Vegetation Performance under a Solar PV Array at the National Wind Technology Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beatty, Brenda; Macknick, Jordan; McCall, James

    Construction activities at most large-scale ground installations of photovoltaic (PV) arrays are preceded by land clearing and re-grading to uniform slope and smooth surface conditions to facilitate convenient construction access and facility operations. The impact to original vegetation is usually total eradication followed by installation of a gravel cover kept clear of vegetation by use of herbicides. The degree to which that total loss can be mitigated by some form of revegetation is a subject in its infancy, and most vegetation studies at PV development sites only address weed control and the impact of tall plants on the efficiency ofmore » the solar collectors from shading.This study seeks to address this void, advancing the state of knowledge of how constructed PV arrays affect ground-level environments, and to what degree plant cover, having acceptable characteristics within engineering constraints, can be re-established.« less

  17. [Determinants of occupational injuries in the construction of the "high speed train" Bologna-Florence].

    PubMed

    Pavone, Venere Leda Mara; Lisi, Catiuscia; Cinti, Danilo; Cervino, Daniela; Costantini, Adele Seniori; Forastiere, Francesco

    2007-01-01

    to study determinants of occupational injuries in tunnel construction using data from the surveillance system which had been implemented in order to monitor accidents during the construction of the "high speed train tracks in the Italian Regions Emilia-Romagna and Tuscany. retrospective cohort study. 16 sites for the construction of 14 tunnels of the high speed railway-tract Bologna-Firenze, in Italy. 1,602 workers (of 3,000 employed in the underground tunnelling), aged 18 - 67 years, operating during excavation with traditional method in 1999-2002. A total of 549 injuries occurred among 385 workers. The number of worked hours were used as time at risk. incidence rate ratios (IRR) and 95% confidence intervals for all injuries, serious injuries and first injuries were considered in separate multiple regression analyses (Poisson). residence, task and working phase were taken into consideration. An increased risk was found for younger workers, for carpenters (IRR "all-events" = 2.33; 95% CI=1.85-2.94; IRR" first-events" = 2.12; 95% CI 1.62-2.77) and miners (IRR "all-events" = 1.76; 95% CI 1.39-2.24; IRR"first-events" = 1.71; 95% CI 1.30-2.24) vs. machinery operators. Construction of inverted arch turns out to have an incidence rate ratio three times higher than digging out (IRR "all-events" = 2.79; 95% CI 2.27-3.43; IRR "firsts-event = 2.98; 95% CI 2.33-3.81). The probability of "serious" injuries (>30 days) is higher for miners (IRR=2.45; 95% CI 1.65-3.64) and for carpenters (IRR=2.31; 95% CI 1.53-3.49). this study pointed out to indicate some determinants (age, task and work phase) of injuries in tunneling about which little had been published previously. These results are useful for addressing preventive measures, for control and prevention activities and point to the need to explore the effect of experience and to study, through a case crossover design, transient working and individual risk factors for traumatic injury within these working sites.

  18. Fall hazard control observed on residential construction sites.

    PubMed

    Kaskutas, Vicki; Dale, Ann Marie; Nolan, James; Patterson, Dennis; Lipscomb, Hester J; Evanoff, Bradley

    2009-06-01

    Falls are a leading cause of mortality and morbidity in the construction industry. This study measured fall hazards at residential construction sites. Trained carpenters administered the St. Louis Audit of Fall Risks and interviewed carpenters. The prevalence of fall prevention practices meeting safety criteria was counted and correlations explored. We identified a high prevalence of fall hazards at the 197 residential sites audited. Roof sheathing met safety criteria most consistently (81%) and truss setting least consistently (28%). Use of personal fall arrest and monitoring of unguarded floor openings were rare. Safer performance on several scales was correlated. Construction sites of large-sized contractors were generally safer than smaller contractors. Apprentice carpenters were less familiar with their employers' fall prevention plan than experienced workers. Safety could be improved with consistent use of recognized fall prevention practices at residential construction sites.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adamov, E.O.; Lebedev, V.A.; Kuznetsov, Yu.N.

    Zheleznogorsk is situated near the territorial center -- Krasnoyarsk on the Yenisei river. Mining and chemical complex is the main industrial enterprise of the town, which has been constructed for generation and used for isolation of weapons-grade plutonium. Heat supply to the chemical complex and town at the moment is largely provided by nuclear co-generation plant (NCGP) on the basis of the ADEh-2 dual-purpose reactor, generating 430 Gcal/h of heat and, partially, by coal backup peak-load boiler houses. NCGP also provides 73% of electric power consumed. In line with agreements between Russia and USA on strategic arms reduction and phasingmore » out of weapons-grade plutonium production, decommissioning of the ADEh-2 reactor by 2000 is planned. Thus, a problem arises relative to compensation for electric and thermal power generation for the needs of the town and industrial enterprises, which is now supplied by the reactor. A nuclear power plant constructed on the same site as a substituting power source should be considered as the most practical option. Basic requirements to the reactor of substituting nuclear power plant are as follows. It is to be a new generation reactor on the basis of verified technologies, having an operating prototype optimal for underground siting and permitting utmost utilization of the available mining workings and those being disengaged. NCGP with the reactor is to be constructed in the time period required and is to become competitive with other possible power sources. Analysis has shown that the VK-300 simplified vessel-type boiling reactor meets the requirements made in the maximum extent. Its design is based on the experience of the VK-50 reactor operation for a period of 30 years in Dimitrovgrad (Russia) and allows for experience in the development of the SBWR type reactors. The design of the reactor is discussed.« less

  20. Site Characterization for a Deep Borehole Field Test

    NASA Astrophysics Data System (ADS)

    Kuhlman, K. L.; Hardin, E. L.; Freeze, G. A.; Sassani, D.; Brady, P. V.

    2015-12-01

    The US Department of Energy Office of Nuclear Energy is at the beginning of 5-year Deep Borehole Field Test (DBFT) to investigate the feasibility of constructing and characterizing two boreholes in crystalline basement rock to a depth of 5 km (16,400 ft). The concept of deep borehole disposal for radioactive waste has some advantages over mined repositories, including incremental construction and loading, the enhanced natural barriers provided by deep continental crystalline basement, and reduced site characterization. Site characterization efforts need to determine an eligible site that does not have the following disqualifying characteristics: greater than 2 km to crystalline basement, upward vertical fluid potential gradients, presence of economically exploitable natural resources, presence of high permeability connection to the shallow subsurface, and significant probability of future seismic or volcanic activity. Site characterization activities for the DBFT will include geomechanical (i.e., rock in situ stress state, and fluid pressure), geological (i.e., rock and fracture infill lithology), hydrological (i.e., quantity of fluid, fluid convection properties, and solute transport mechanisms), and geochemical (i.e., rock-water interaction and natural tracers) aspects. Both direct (i.e., sampling and in situ testing) and indirect (i.e., borehole geophysical) methods are planned for efficient and effective characterization of these site aspects and physical processes. Borehole-based characterization will be used to determine the variability of system state (i.e., stress, pressure, temperature, and chemistry) with depth, and interpretation of material and system parameters relevant to numerical site simulation. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  1. E-consult implementation: lessons learned using consolidated framework for implementation research.

    PubMed

    Haverhals, Leah M; Sayre, George; Helfrich, Christian D; Battaglia, Catherine; Aron, David; Stevenson, Lauren D; Kirsh, Susan; Ho, Michael; Lowery, Julie

    2015-12-01

    In 2011, the Veterans Health Administration (VHA) implemented electronic consults (e-consults) as an alternative to in-person specialty visits to improve access and reduce travel for veterans. We conducted an evaluation to understand variation in the use of the new e-consult mechanism and the causes of variable implementation, guided by the Consolidated Framework for Implementation Research (CFIR). Qualitative case studies of 3 high- and 5 low-implementation e-consult pilot sites. Participants included e-consult site leaders, primary care providers, specialists, and support staff identified using a modified snowball sample. We used a 3-step approach, with a structured survey of e-consult site leaders to identify key constructs, based on the CFIR. We then conducted open-ended interviews, focused on key constructs, with all participants. Finally, we produced structured, site-level ratings of CFIR constructs and compared them between high- and low-implementation sites. Site leaders identified 14 initial constructs. We conducted 37 interviews, from which 4 CFIR constructs distinguished high implementation e-consult sites: compatibility, networks and communications, training, and access to knowledge and information. For example, illustrating compatibility, a specialist at a high-implementation site reported that the site changed the order of consult options so that all specialties listed e-consults first to maintain consistency. High-implementation sites also exhibited greater agreement on constructs. By using the CFIR to analyze results, we facilitate future synthesis with other findings, and we better identify common patterns of implementation determinants common across settings.

  2. Applied environmental technology development at the Savannah River Site: A retrospective on the last half of the 20th century

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, B.B.

    2000-03-13

    Fifty years ago, the Savannah River Site (SRS) was built to produce nuclear materials. These operations impacted air, soil, groundwater, ecology and the local environment. Throughout its history, SRS has addressed these contamination issues directly and has maintained a strong commitment to environmental stewardship. The site boasts many environmental firsts. Notably, SRS was the first major DOE facility to perform a baseline ecological assessment. This pioneering effort, by Ruth Patrick and the Philadelphia Academy of Sciences, was performed during SRS planning and construction in the early 1950's. This unique early example sets the stage for subsequent efforts. Since that time,more » the scientists and engineers at SRS have proactively identified environmental problems as they occurred and have skillfully developed elegant and efficient solutions.« less

  3. Decommissioning of magnox Ltd fuel cooling pond facilities in the UK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bertoncini, Carlo

    2013-07-01

    Magnox reactors were the first generation of nuclear power stations built in the UK; ten sites in total, of which, nine had wet fuel routes with cooling ponds. Five ponds are currently in a decommissioning phase; this paper will focus primarily on Hunterston-A (HNA) Site and the central programme of work which governs its management. During its operation, the Cartridge Cooling Pond at HNA was used to receive the spent fuel discharged from the Site's two reactors, it was then stored for cooling purposes prior to dispatch off site. The current decommissioning phase focusses on draining the 6500 m{sup 3}more » pond. Due to the Site's limited caesium removal facilities, a stand-alone effluent treatment plant was constructed to improve abatement and reduce the pond activity from 200 to 0.7 Bq/ml (β). This was necessary due to increased environmental standards introduced since the site had ceased generation ten years previously. Early characterisation and experience from other sites concluded that if the pond were to be drained without any treatment to the walls, doses to the Operators, during subsequent decommissioning works, would routinely be in excess of 1 mSv.hr{sup -1}(γ). An opportunity was realised within the Ponds Programme that if the surface layer of the pond walls were to be removed during drain-down, ambient dose rates would be reduced by a factor of 10; this would allow for more cost-effective decommissioning options in the future. Ultrahigh pressure water jetting was tested and proved to yield a ∼95% total-activity reduction on treated surfaces. Challenges were overcome in providing safe and secure access to Decommissioning Operators to perform this operation by means of floating platforms on the surface of the pond. As strategies to clear facilities to exemption levels are becoming both cost prohibitive and not reasonably practicable, work is now underway in the Programme to determine the optimum condition for entry into long-term quiescent storage, prior to final demolition. This paper will discuss the strategy and techniques which led to Magnox Ltd ponds to be of national and international interest to the nuclear community. (authors)« less

  4. The Methodology of Interactive Parametric Modelling of Construction Site Facilities in BIM Environment

    NASA Astrophysics Data System (ADS)

    Kozlovská, Mária; Čabala, Jozef; Struková, Zuzana

    2014-11-01

    Information technology is becoming a strong tool in different industries, including construction. The recent trend of buildings designing is leading up to creation of the most comprehensive virtual building model (Building Information Model) in order to solve all the problems relating to the project as early as in the designing phase. Building information modelling is a new way of approaching to the design of building projects documentation. Currently, the building site layout as a part of the building design documents has a very little support in the BIM environment. Recently, the research of designing the construction process conditions has centred on improvement of general practice in planning and on new approaches to construction site layout planning. The state of art in field of designing the construction process conditions indicated an unexplored problem related to connection of knowledge system with construction site facilities (CSF) layout through interactive modelling. The goal of the paper is to present the methodology for execution of 3D construction site facility allocation model (3D CSF-IAM), based on principles of parametric and interactive modelling.

  5. Strategy to Ensure Institutional Control Implementation at Superfund Sites

    EPA Pesticide Factsheets

    This document sets forth EPA’s strategy (Strategy) for ensuring that institutional controls (ICs) are successfully implemented at Superfund sites, with an emphasis on evaluating ICs at sites where all construction of all remedies is complete (construction complete sites).

  6. The Advanced Technology Solar Telescope: design and early construction

    NASA Astrophysics Data System (ADS)

    McMullin, Joseph P.; Rimmele, Thomas R.; Keil, Stephen L.; Warner, Mark; Barden, Samuel; Bulau, Scott; Craig, Simon; Goodrich, Bret; Hansen, Eric; Hegwer, Steve; Hubbard, Robert; McBride, William; Shimko, Steve; Wöger, Friedrich; Ditsler, Jennifer

    2012-09-01

    The National Solar Observatory’s (NSO) Advanced Technology Solar Telescope (ATST) is the first large U.S. solar telescope accessible to the worldwide solar physics community to be constructed in more than 30 years. The 4-meter diameter facility will operate over a broad wavelength range (0.35 to 28 μm ), employing adaptive optics systems to achieve diffraction limited imaging and resolve features approximately 20 km on the Sun; the key observational parameters (collecting area, spatial resolution, spectral coverage, polarization accuracy, low scattered light) enable resolution of the theoretically-predicted, fine-scale magnetic features and their dynamics which modulate the radiative output of the sun and drive the release of magnetic energy from the Sun’s atmosphere in the form of flares and coronal mass ejections. In 2010, the ATST received a significant fraction of its funding for construction. In the subsequent two years, the project has hired staff and opened an office on Maui. A number of large industrial contracts have been placed throughout the world to complete the detailed designs and begin constructing the major telescope subsystems. These contracts have included the site development, AandE designs, mirrors, polishing, optic support assemblies, telescope mount and coudé rotator structures, enclosure, thermal and mechanical systems, and high-level software and controls. In addition, design development work on the instrument suite has undergone significant progress; this has included the completion of preliminary design reviews (PDR) for all five facility instruments. Permitting required for physically starting construction on the mountaintop of Haleakalā, Maui has also progressed. This paper will review the ATST goals and specifications, describe each of the major subsystems under construction, and review the contracts and lessons learned during the contracting and early construction phases. Schedules for site construction, key factory testing of major subsystems, and integration, test and commissioning activities will also be discussed.

  7. Integrating Building Information Modeling and Health and Safety for Onsite Construction

    PubMed Central

    Ganah, Abdulkadir; John, Godfaurd A.

    2014-01-01

    Background Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. Methods In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. Results The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. Conclusion From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite. PMID:25830069

  8. Integrating building information modeling and health and safety for onsite construction.

    PubMed

    Ganah, Abdulkadir; John, Godfaurd A

    2015-03-01

    Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

  9. Mental Constructions and Constructions of Web Sites: Learner and Teacher Points of View

    ERIC Educational Resources Information Center

    Hazzan, Orit

    2004-01-01

    This research focuses on knowledge and ways in which knowledge may be constructed in the learner's mind. Specifically, it addresses the Web as a cognitive supporter for learning, organising and constructing a new domain of knowledge. In particular, the research analyses student reflection on constructing web sites. The analysis is based on an…

  10. 4 Metre diameter penstock construction for the Raymond Reservoir Hydro Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, H.D.; Alexander, M.

    1995-12-31

    A four metre diameter 770 m long buried steel penstock was constructed for the 20 MW Raymond Reservoir Hydro Project in southern Alberta. The penstock delivers up to 56.7 m{sup 3}/sec of irrigation water at an effective head of 44 m to a 2.6 m diameter Kaplan turbine. The hydro facility was commissioned in the spring of 1994. The steel pipe was delivered to the site in 18 m long sections from a fabrication plant located 250 km away. Specialized equipment was engineered and constructed to externally coat and internally line the pipe sections on site. The pipe sections, weighingmore » from 27,000 to 30,000 kg, were rolled and moved on a specially built lathe during the external sandblasting and tape wrapping operation. The external tape wrapping is one element of the cathodic protection system for the steel pipe. Specialized equipment was modified to sandblast the interior to white metal and then mechanically apply three coats of internal epoxy lining. The internal lining improves the hydraulic characteristics of the pipe in addition to protecting the pipe from corrosion. This innovative approach to coating and lining the pipe resulted in an exceptionally high quality product at an affordable cost.« less

  11. Modifying the photoelectric behavior of bacteriorhodopsin by site-directed mutagenesis: electrochemical and genetic engineering approaches to molecular devices

    NASA Astrophysics Data System (ADS)

    Hong, F. T.; Hong, F. H.; Needleman, R. B.; Ni, B.; Chang, M.

    1992-07-01

    Bacteriorhodopsins (bR's) modified by substitution of the chromophore with synthetic vitamin A analogues or by spontaneous mutation have been reported as successful examples of using biomaterials to construct molecular optoelectronic devices. The operation of these devices depends on desirable optical properties derived from molecular engineering. This report examines the effect of site-directed mutagenesis on the photoelectric behavior of bR thin films with an emphasis on their application to the construction of molecular devices based on their unique photoelectric behavior. We examine the photoelectric signals induced by a microsecond light pulse in thin films which contain reconstituted oriented purple membrane sheets isolated from several mutant strains of Halobacterium halobium. A recently developed expression system is used to synthesize mutant bR's in their natural host, H. halobium. We then use a unique analytical method (tunable voltage clamp method) to investigate the effect of pH on the relaxation of two components of the photoelectric signals, B1 and B2. We found that for the four mutant bR's examined, the pH dependence of the B2 component varies significantly. Our results suggest that genetic engineering approaches can produce mutant bR's with altered photoelectric characteristics that can be exploited in the construction of devices.

  12. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA): Revised Addition

    EPA Science Inventory

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  13. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    EPA Science Inventory

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  14. Making the Most of Your School Site. School Buildings Planning, Design, and Construction Series No. 2.

    ERIC Educational Resources Information Center

    Odell, John H.

    A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on site selection covering selection criteria; traffic issues; and site services, such as water, power, and sewer. Additionally…

  15. Feasibility study for the construction of a new LNG receiving terminal. Turkey. Volume 1. Export trade information. [LNG (liquified natural gas)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-06-01

    The report was prepared by The M. W. Kellogg Co. for BOTAS Petroleum Pipeline Corporation of Ankara, Turkey. The study was undertaken to evaluate the cost and economics of constructing a second liquified natural gas (LNG) terminal in Turkey to meet future requirements for natural gas. Volume 1 is divided into the following sections: (1) Introduction; (2) Summary and Conclusions; (3) Design Basis; (4) Site Evaluation; (5) LNG Terminal Design; (6) Major Equipment and Instrumentation; (7) Marine Operations; (8) Safety Considerations; (9) Environmental Review; (10) Preliminary Project Execution Strategy; (11) Cost Estimates; (12) Project Master Schedule; (13) Economic Analysis; (14)more » Financing; (15) Future Work.« less

  16. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. In the foreground is Tammy Kelly, site manager, with Southeast Cherokee Construction Inc. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  17. Measuring Air Quality in a Construction Site Biotope Using the AQM-65 Analyser

    NASA Astrophysics Data System (ADS)

    Ioana-Alina, Creţan; Nicoleta, Nemeș

    2017-10-01

    Activities related to the execution of construction works often exert pressure on the quality of environmental factors in adjacent habitat. In various stages of realization of the works if is the opening of the building site and access roads, borrow pits and the storage, or the construction itself, all the related activities will cause harm in various degrees of vegetation on the construction site and its surroundings. Large areas are rendered non-productive and, although they should be restored for use in the same place or elsewhere, sometimes they can lose their natural habitat baseline. The paper is presenting a case study of air quality monitoring using the AQM 65 analyser for a construction site located near Timisoara locality, Timis County, Romania.

  18. [Ecological risk assessment of dam construction for terrestrial plant species in middle reach of Lancangjiang River, Southwest China].

    PubMed

    Li, Xiao-Yan; Dong, Shi-Kui; Liu, Shi-Liang; Peng, Ming-Chun; Li, Jin-Peng; Zhao, Qing-He; Zhang, Zhao-Ling

    2012-08-01

    Taking the surrounding areas of Xiaowan Reservoir in the middle reach of Lancangjiang River as study area, and based on the vegetation investigation at three sites including electricity transmission area (site 1), electricity-transfer substation and roadsides to the substation (site 2), and emigration area (site 3) in 1997 (before dam construction), another investigation was conducted on the vegetation composition, plant coverage, and dominant species at the same sites in 2010 (after dam construction), aimed to evaluate the ecological risk of the dam construction for the terrestrial plant species in middle reach of Lancangjiang River. There was an obvious difference in the summed dominance ratio of dominant species at the three sites before and after the dam construction. According the types of species (dominant and non-dominant species) and the changes of plant dominance, the ecological risk (ER) for the plant species was categorized into 0 to IV, i.e., no or extremely low ecological risk (0), low ecological risk (I), medium ecological risk (II), high ecological risk (III), and extremely high ecological risk (IV). As affected by the dam construction, the majority of the species were at ER III, and a few species were at ER IV. The percentage of the plant species at ER III and ER IV at site 3 was higher than that at sites 1 and 2. The decrease or loss of native plants and the increase of alien or invasive plants were the major ecological risks caused by the dam construction. Effective protection strategies should be adopted to mitigate the ecological risk of the dam construction for the terrestrial plants at species level.

  19. Philadelphia gas works medium-Btu coal gasification project: environmental assessment. [GKT supplied by Krupp-Koppers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-12-01

    The coal gasification plant will occupy a 43-acre site, known as the Riverside Site, located along the Delaware River next to Port Richmond between the Betsy Ross and Benjamin Franklin Bridges. The cleared site was previously used for industrial purposes and has a G-2 industrial zoning. Adverse impacts during the construction phase of the project are not expected to be significantly different than those occurring during any major industrial construction project. During operation of the coal gasification facility, specific mitigative measures have been designed into the facility to avoid adverse environmental impacts wherever possible. In addition to these extensive engineeringmore » safeguards, elaborate monitoring and control instrumentation shall be used. The GKT entrained bed, oxygen-blown gasification process provided by Krupp/Koppers was selected because it is a commercially proven system and because of its positive environmental characteristics such as its ability to gasify many coal types and the fact that it does not produce tars, phenols, or ammonia. During gasification of the coal, pollutants such as heavy metals in the coal are concentrated into the slag and ash. None of these pollutants are found in the product gas. The facility will produce 250 tpd of non-hazardous slag and fly ash. The combined slag and fly ash will occupy 347 cubic yards per day of landfill volume. Available haulers and landfills have been identified.A sophisticated health and safety program will include appropriate monitoring instruments for CO, H/sub 2/, H/sub 2/S, polynuclear aromatic hydrocarbons, organic compounds, and coal dust. Air emissions from operation of the coal gasification plant are not considered significant. Dust control systems have been designed into the facility to minimize fugitive dust emissions.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Jody K.

    Remedial investigation and cleanup at the Rocky Flats, Colorado, Site was completed in 2005. Uplands, riparian, and wetland habitat were disturbed during cleanup and closure activities and required extensive revegetation. Unavoidable disturbances to habitat of the Preble's meadow jumping mouse (a federally listed species) and wetlands required consultation with regulatory agencies and mitigation. Mitigation wetlands were constructed in two drainages, and a third developed naturally where a soil borrow area intercepted the groundwater table. During the 50-plus years of site operations, 12 ponds were constructed in three drainages to manage and retain runoff and sewage treatment plant discharges prior tomore » release off site. A batch-release protocol has been used for the past several decades at the terminal ponds, which has affected the riparian communities downstream. To return the hydrologic regime to a more natural flow-through system similar to the pre-industrial-use conditions, seven interior dams (of 12) have been breached, and the remaining five dams are scheduled for breaching between 2011 and 2020. At the breached dams, the former open water areas have transformed to emergent wetlands, and the stream reaches have returned to a flow-through system. Riparian and wetland vegetation has established very well. The valves of the terminal ponds were opened in fall 2011 to begin flow-through operations and provide water to the downstream plant communities while allowing reestablishment of vegetation in the former pond bottoms prior to breaching. A number of challenges and issues were addressed during the revegetation effort. These included reaching an agreement on revegetation goals, addressing poor substrate quality and soil compaction problems, using soil amendments and topsoil, selecting seeds, determining the timing and location of revegetation projects relative to continuing closure activities, weed control, erosion control, revegetation project field oversight, and contractual limitations. A variety of ecological restoration techniques were conducted at the site to meet these challenges. These efforts have resulted in vegetation becoming well established in most locations. (author)« less