10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...
10 CFR 2.104 - Notice of hearing.
Code of Federal Regulations, 2012 CFR
2012-01-01
... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple... construct and operate nuclear power reactors of identical design (“common design”) to be located at multiple...
Code of Federal Regulations, 2010 CFR
2010-01-01
... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...
Code of Federal Regulations, 2011 CFR
2011-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2013 CFR
2013-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2010 CFR
2010-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2014 CFR
2014-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2012 CFR
2012-01-01
... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...
10 CFR 36.15 - Start of construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Requirements § 36.15 Start of construction. The applicant may not begin construction of a new irradiator prior... work, purchase of a site, site surveys or soil testing, site preparation, site excavation, construction... license with respect to the requirements of the Atomic Energy Act of 1954, as amended, and rules...
Inspection of Construction Works According to Polish Construction Law
NASA Astrophysics Data System (ADS)
Czemplik, A.
2015-11-01
Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 52 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Pt. 52, App. N...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
10 CFR 50.81 - Creditor regulations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-31
...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...
Code of Federal Regulations, 2013 CFR
2013-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2014 CFR
2014-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2012 CFR
2012-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
AP1000{sup R} licensing and deployment in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jordan, R. P.; Russ, P. A.; Filiak, P. P.
2012-07-01
In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two newmore » nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed towards deployment. AP1000 Design Certification and COL deployment, and management of the plant construction in accordance with the conditions within these approvals, remain as significant site and corporate responsibilities. These licensing-construction integrated activities must now focus on identifying and resolving 'as-built' departures from the standardized design as assessed against the certified AP1000 technical and licensing basis. Within this paper, significant aspects of the AP1000 U.S. licensing will be discussed, including identifying systems and processes used in ensuring compliance while deploying the standardized design. Critical licensing steps, licensing deployment actions as plant construction progresses and defining the road forward to a successful completion of licensing actions will be addressed. (authors)« less
10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...
Code of Federal Regulations, 2014 CFR
2014-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...
47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... their authorized channels at all of their base stations or fixed stations. [69 FR 75173, Dec. 15, 2004] ... will not be converted to individual, site-by-site authorizations for already constructed stations. (d...
10 CFR 2.627 - Partial decision on site suitability issues in combined license proceeding.
Code of Federal Regulations, 2010 CFR
2010-01-01
... license proceeding. 2.627 Section 2.627 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR... License To Construct Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations... accordance with this subpart. A limited work authorization may not be issued under 10 CFR 50.10(e) and no...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
... part 40.\\*\\ If issued, that license would authorize SEI to construct and operate an in situ recovery (ISR) uranium project at the Ross site in Crook County, Wyoming. In response to an October 27, 2011... Commission in its decision in Sequoyah Fuels Corp. (Gore, Oklahoma Site), CLI-03-15, 58 NRC 349 (2003...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant... that the applicant wishes to have the application considered under 10 CFR part 52, appendix N, and must...
47 CFR 101.1325 - Construction requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...
47 CFR 101.1325 - Construction requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Construction requirements. 101.1325 Section 101... FIXED MICROWAVE SERVICES Multiple Address Systems System Requirements § 101.1325 Construction requirements. (a) Incumbent and site-based licenses are subject to the construction requirements set forth in...
10 CFR 60.61 - Provision of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... characterization, siting, development, design, licensing, construction, operation, regulation, permanent closure... available at the NRC Web site, http://www.nrc.gov, and/or at the NRC Public Document Room, and copies are...
Code of Federal Regulations, 2011 CFR
2011-10-01
... a commercial nuclear power plant site once every two years in conformance with 44 CFR part 350. EPZ... Protection Agency, Department of Health and Human Services, Department of Interior, Department of Energy...) A license to construct or operate a commercial nuclear power plant; (2) A possession-only license...
10 CFR 50.37 - Agreement limiting access to Classified Information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...
10 CFR 2.1115 - Designation of issues for adjudicatory hearing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
... and Licensing Board; AREVA Enrichment Services, LLC (Eagle Rock Enrichment Facility) December 17, 2010... construction and operation of a gas centrifuge uranium enrichment facility--denoted as the Eagle Rock... site at http://www.nrc.gov/materials/fuel-cycle-fac/arevanc.html . These and other documents relating...
10 CFR 60.15 - Site characterization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...
10 CFR 60.15 - Site characterization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...
10 CFR 60.15 - Site characterization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...
10 CFR 60.15 - Site characterization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... in situ testing before and during construction shall be planned and coordinated with geologic... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses... be described in such application. (b) Unless the Commission determines with respect to the site...
The use of NUREGs 1199 and 1200 in the Illinois LLW licensing program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Klinger, J.G.; Harmon, D.F.
1991-12-31
This paper will describe how the LLW licensing staff of the Illinois Department of Nuclear Safety used NRC`s NUREG 1199, NUREG 1200, NUREG 1300 and Regulatory Guide 4.18 in its licensing program for reviewing and evaluating a LLW disposal facility license application. The paper will discuss how Illinois guidance documents were prepared based on modifications made to these NRC documents which were necessary to take into account site and facility specific considerations, as well as changes required by Illinois statutes and regulatory codes. The paper will review the recent revisions (January 1991) to NUREG 1199 and 1200 and the importancemore » of these revisions. The paper will also discuss recommended modifications to these NRC documents and provide an update on the status of the Department`s review and evaluation of an application for a license to site, construct and operate a LLW disposal facility in Illinois.« less
78 FR 9945 - Crow Butte Resources, Inc.; Establishment of Atomic Safety and Licensing Board
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-12
... Material License, SUA-1534, to obtain authority to construct and operate an in situ uranium recovery satellite facility at its Marsland site in Dawes County, Nebraska. In response to a ``Notice of Opportunity for a Hearing'' published in the Federal Register, see 77 Fed. Reg. 71,454 (Nov. 30, 2012), hearing...
10 CFR 60.17 - Contents of site characterization plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.17 Contents of site characterization plan. The... construction authorization for a geologic repository operations area; (4) Criteria, developed pursuant to... area for the location of a geologic repository; and (5) Any other information which the Commission, by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hosking, H.
The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.
47 CFR 27.1186 - Payment issues.
Code of Federal Regulations, 2010 CFR
2010-10-01
... set forth in § 27.1170. If an AWS licensee is initiating operations for a newly constructed site or modified existing site in licensed bands overlapping the 2150-2160/62 MHz band, the AWS licensee must file... level height of the transmitting antenna centerline. AWS entities have a continuing duty to maintain the...
47 CFR 27.1186 - Payment issues.
Code of Federal Regulations, 2011 CFR
2011-10-01
... set forth in § 27.1170. If an AWS licensee is initiating operations for a newly constructed site or modified existing site in licensed bands overlapping the 2150-2160/62 MHz band, the AWS licensee must file... level height of the transmitting antenna centerline. AWS entities have a continuing duty to maintain the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eugene S. Grecheck
2010-11-30
This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision onmore » building a new nuclear power plant at the North Anna site.« less
Cullen, Patricia; Clapham, Kathleen; Byrne, Jake; Hunter, Kate; Senserrick, Teresa; Keay, Lisa; Ivers, Rebecca
2016-08-01
Evidence indicates that Aboriginal people are underrepresented among driver licence holders in New South Wales, which has been attributed to licensing barriers for Aboriginal people. The Driving Change program was developed to provide culturally responsive licensing services that engage Aboriginal communities and build local capacity. This paper outlines the formative evaluation of the program, including logic model construction and exploration of contextual factors. Purposive sampling was used to identify key informants (n=12) from a consultative committee of key stakeholders and program staff. Semi-structured interviews were transcribed and thematically analysed. Data from interviews informed development of the logic model. Participants demonstrated high level of support for the program and reported that it filled an important gap. The program context revealed systemic barriers to licensing that were correspondingly targeted by specific program outputs in the logic model. Addressing underlying assumptions of the program involved managing local capacity and support to strengthen implementation. This formative evaluation highlights the importance of exploring program context as a crucial first step in logic model construction. The consultation process assisted in clarifying program goals and ensuring that the program was responding to underlying systemic factors that contribute to inequitable licensing access for Aboriginal people. Copyright © 2016 Elsevier Ltd. All rights reserved.
Code of Federal Regulations, 2011 CFR
2011-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Definitions. 100.3 Section 100.3 Energy NUCLEAR REGULATORY... means a combined construction permit and operating license with conditions for a nuclear power facility..., issued pursuant to subpart A of part 52 of this chapter, for a site or sites for one or more nuclear...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
During the second half of fiscal year 1996, activities at the Yucca Mountain Site Characterization Project (Project) supported the objectives of the revised Program Plan released this period by the Office of Civilian Radioactive Waste Management of the US Department of Energy (Department). Outlined in the revised plan is a focused, integrated program of site characterization, design, engineering, environmental, and performance assessment activities that will achieve key Program and statutory objectives. The plan will result in the development of a license application for repository construction at Yucca Mountain, if the site is found suitable. Activities this period focused on twomore » of the three near-term objectives of the revised plan: updating in 1997 the regulatory framework for determining the suitability of the site for the proposed repository concept and providing information for a 1998 viability assessment of continuing toward the licensing of a repository. The Project has also developed a new design approach that uses the advanced conceptual design published during the last reporting period as a base for developing a design that will support the viability assessment. The initial construction phase of the Thermal Testing Facility was completed and the first phase of the in situ heater tests began on schedule. In addition, phase-one construction was completed for the first of two alcoves that will provide access to the Ghost Dance fault.« less
Site dose calculations for the INEEL/TMI-2 storage facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, K.B.
1997-12-01
The U.S. Department of Energy (DOE) is licensing an independent spent-fuel storage installation (ISFSI) for the Three Mile Island unit 2 (TMI-2) core debris to be constructed at the Idaho Chemical Processing Plant (ICPP) site at the Idaho National Engineering and Environmental Laboratory (INEEL) using the NUHOMS spent-fuel storage system. This paper describes the site dose calculations, performed in support of the license application, that estimate exposures both on the site and for members of the public. These calculations are unusual for dry-storage facilities in that they must account for effluents from the system in addition to skyshine from themore » ISFSI. The purpose of the analysis was to demonstrate compliance with the 10 CFR 20 and 10 CFR 72.104 exposure limits.« less
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2... processing, the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeitoun, A.
1994-08-01
This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment aremore » construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.« less
Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collar, Craig W
2012-11-16
Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, Gilbert A.
1992-12-01
The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, Gilbert A.
1992-12-01
The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.
10 CFR 52.167 - Issuance of manufacturing license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... proposed reactor(s) can be incorporated into a nuclear power plant and operated at sites having... design and manufacture the proposed nuclear power reactor(s); (5) The proposed inspections, tests... the construction of a nuclear power facility using the manufactured reactor(s). (2) A holder of a...
DFN Modeling for the Safety Case of the Final Disposal of Spent Nuclear Fuel in Olkiluoto, Finland
NASA Astrophysics Data System (ADS)
Vanhanarkaus, O.
2017-12-01
Olkiluoto Island is a site in SW Finland chosen to host a deep geological repository for high-level nuclear waste generated by nuclear power plants of power companies TVO and Fortum. Posiva, a nuclear waste management organization, submitted a construction license application for the Olkiluoto repository to the Finnish government in 2012. A key component of the license application was an integrated geological, hydrological and biological description of the Olkiluoto site. After the safety case was reviewed in 2015 by the Radiation and Nuclear Safety Authority in Finland, Posiva was granted a construction license. Posiva is now preparing an updated safety case for the operating license application to be submitted in 2022, and an update of the discrete fracture network (DFN) model used for site characterization is part of that. The first step describing and modelling the network of fractures in the Olkiluoto bedrock was DFN model version 1 (2009), which presented an initial understanding of the relationships between rock fracturing and geology at the site and identified the important primary controls on fracturing. DFN model version 2 (2012) utilized new subsurface data from additional drillholes, tunnels and excavated underground facilities in ONKALO to better understand spatial variability of the geological controls on geological and hydrogeological fracture properties. DFN version 2 connected fracture geometric and hydraulic properties to distinct tectonic domains and to larger-scale hydraulically conductive fault zones. In the version 2 DFN model, geological and hydrogeological models were developed along separate parallel tracks. The version 3 (2017) DFN model for the Olkiluoto site integrates geological and hydrogeological elements into a single consistent model used for geological, rock mechanical, hydrogeological and hydrogeochemical studies. New elements in the version 3 DFN model include a stochastic description of fractures within Brittle Fault Zones (BFZ), integration of geological and hydrostructural interpretations of BFZ, greater use of 3D geological models to better constrain the spatial variability of fracturing and fractures using hydromechanical principles to account for material behavior and in-situ stresses.
Convoy projects: a case study from Germany
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gruener, W.
The Convoy concept was formulated at a time when Kraftwerk Union (KWU) anticipated the start of five to six turnkey nuclear power plant projects within a very short time frame, related to as many customers, sites, and licensing authorities. To counteract the rapidly escalating costs and schedules of projects then under construction, a series of measures were enacted with the purpose of streamlining and optimizing the work procedures both within the company and in relation with the external partners - customers, licensing authorities and their technical advisors, suppliers, and subsuppliers. The organizational framework and the various tools deployed by themore » turnkey contractor ensured smooth and effective design and construction procedures. The adherence to the original budget and schedule is truly remarkable, encouraging further investigation into the applicability of such methods and procedures for future projects.« less
NASA Technical Reports Server (NTRS)
2002-01-01
Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oostrom, Martinus; Vail, Lance W.
Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction andmore » operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.« less
Code of Federal Regulations, 2014 CFR
2014-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Code of Federal Regulations, 2013 CFR
2013-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
Code of Federal Regulations, 2012 CFR
2012-01-01
..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...
14 CFR 420.29 - Launch site location review for unproven launch vehicles.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.29 Launch site location review for unproven launch vehicles. An applicant for a license to operate a launch site for an unproven launch vehicle shall...
14 CFR 420.29 - Launch site location review for unproven launch vehicles.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.29 Launch site location review for unproven launch vehicles. An applicant for a license to operate a launch site for an unproven launch vehicle shall...
47 CFR 90.767 - Construction and implementation of EA and Regional licenses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Regional licenses. 90.767 Section 90.767 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED... Use of Frequencies in the 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide Systems § 90.767 Construction and implementation of EA and Regional licenses. (a...
14 CFR 420.45 - Transfer of a license to operate a launch site.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...
14 CFR 420.45 - Transfer of a license to operate a launch site.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Transfer of a license to operate a launch site. 420.45 Section 420.45 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
10 CFR 50.23 - Construction permits.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...
47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Use of Frequencies in the 220-222 MHz Band Policies Governing the Licensing and Use of Phase II Ea, Regional and Nationwide Systems § 90.769 Construction and implementation of Phase II nationwide licenses...
14 CFR 420.30 - Launch site location review for permitted launch vehicles.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.30 Launch site location review for...
14 CFR 420.30 - Launch site location review for permitted launch vehicles.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.30 Launch site location review for...
Code of Federal Regulations, 2010 CFR
2010-01-01
... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-09-27
The New Lyme Landfill is located near State Route 11 on Dodgeville Road in Ashtabula County, approximately 20 miles south of the City of Ashtabula, Ohio. The landfill occupies about 40 acres of a 100-acre tract. Operations began at the site in 1969, and were initially managed by two farmers. In 1971, the landfill was licensed by the State of Ohio and operations were taken over by a licensed landfill operator. According to documentation, the New Lyme Landfill received household, industrial, commercial, and institutional wastes and construction and demolition debris. However, numerous violations of the license occurred, including: open dumping;more » improper spreading and compacting of wastes; no State approval for disposal of certain industrial wastes; and excavation of trenches into the shale bedrock. In August 1978, the landfill was closed by the Ashtabula County Health Department. Documents indicate that wastes at the New Lyme Landfill site included: coal tar distillates, asbestos, coal tar, resins and resin tar, paint sludge, oils, paint lacquer thinner, peroxide, corrosive liquids, acetone, xylene, toluene, kerosene, naptha, benzene, linseed oil, mineral oil, fuel oil, chlorinated solvents, 2,4-D, and laboratory chemicals. The selected remedial action is included.« less
14 CFR 420.27 - Launch site location review-information requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch site location review-information... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.27 Launch site location review—information requirements. An...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeitoun, A.
The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, bothmore » normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.« less
Phase 1 environmental report for the Advanced Neutron Source at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blasing, T.J.; Brown, R.A.; Cada, G.F.
1992-02-01
The US Department of Energy (DOE) has proposed the construction and operation of the Advanced Neutron Source (ANS), a 330-MW(f) reactor, at Oak Ridge National Laboratory (ORNL) to support neutron scattering and nuclear physics experiments. ANS would provide a steady-state source of neutrons that are thermalized to produce sources of hot, cold, and very coal neutrons. The use of these neutrons in ANS experiment facilities would be an essential component of national research efforts in basic materials science. Additionally, ANS capabilities would include production of transplutonium isotopes, irradiation of potential fusion and fission reactor materials, activation analysis, and production ofmore » medical and industrial isotopes such as {sup 252}Cf. Although ANS would not require licensing by the US Nuclear Regulatory Commission (NRC), DOE regards the design, construction, and operation of ANS as activities that would produce a licensable facility; that is, DOE is following the regulatory guidelines that NRC would apply if NRC were licensing the facility. Those guidelines include instructions for the preparation of an environmental report (ER), a compilation of available data and preliminary analyses regarding the environmental impacts of nuclear facility construction and operation. The ER, described and outlined in NRC Regulatory Guide 4.2, serves as a background document to facilitate the preparation of environmental impact statements (EISs). Using Regulatory Guide 4.2 as a model, this ANS ER provides analyses and information specific to the ANS site and area that can be adopted (and modified, if necessary) for the ANS EIS. The ER is being prepared in two phases. Phase 1 ER includes many of the data and analyses needed to prepare the EIS but does not include data or analyses of alternate sites or alternate technologies. Phase 2 ER will include the additional data and analyses stipulated by Regulatory Guide 4.2.« less
Code of Federal Regulations, 2011 CFR
2011-01-01
... and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and Conditions § 420.43 Duration. A license to operate a launch site remains in effect for five years from the date of issuance unless...
Code of Federal Regulations, 2010 CFR
2010-01-01
... and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and Conditions § 420.43 Duration. A license to operate a launch site remains in effect for five years from the date of issuance unless...
47 CFR 25.113 - Station licenses and launch authority.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...
47 CFR 25.113 - Station licenses and launch authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been... for the antenna structure in question. (f) Construction permits are not required for U.S.-licensed...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas. 40.42 Section 40.42 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Licenses § 40.42 Expiration and termination of licenses and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas. 40.42 Section 40.42 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Licenses § 40.42 Expiration and termination of licenses and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas. 40.42 Section 40.42 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Licenses § 40.42 Expiration and termination of licenses and...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas. 40.42 Section 40.42 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Licenses § 40.42 Expiration and termination of licenses and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas. 40.42 Section 40.42 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Licenses § 40.42 Expiration and termination of licenses and...
Calys-Tagoe, Benedict N L; Clarke, Edith; Robins, Thomas; Basu, Niladri
2017-11-06
Artisanal and small-scale gold mining (ASGM) represents one of the most hazardous work environments. While formalization of this sector has been suggested (e.g., Minamata Convention) as a means to improve working conditions, we are unaware of empirical evidence that supports this notion. This study aimed to compare sociodemographic profiles, work profiles, and injury rates among miners working in licensed versus un-licensed ASGM sites. In the Tarkwa mining region of Ghana, 404 small-scale miners were recruited in 2014 and interviewed regarding their occupational injury experiences over the preceding 10 years. Workers were drawn from 9 mining sites, of which 5 were licensed and 4 were not licensed. Sociodemographic characteristics of miners from the two groups were relatively similar. Those currently working in an un-licensed mine have spent more time in the ASGM sector than those currently working in a licensed mine (94 vs. 70 months). Miners working in an un-licensed site tended to experience more injury episodes (e.g., 26% vs. 8% had 3 or more injury events) and not use personal protective equipment during the time of an injury (92% indicated to not using vs. 73%) when compared to miners working in a licensed site. A total of 121 injury episodes were recorded for 2245 person years of ASGM work. The injury rate for those working in un-licensed mines was 5.9 per 100 person years (59 injuries in 995 person years) versus 5.0 (62 injuries in 1250 person-years) in the licensed mines. When focusing on the male miners, there was a significant difference in injury rates between those working in a licensed mine (4.2 per 100 person years) versus an un-licensed mine (6.1 per 100 person years). These findings advance our understanding of injuries amongst ASGM workers, and help identify important differences in socio-demographics, work profiles, and injury rates between miners working in a licensed versus and un-licensed site. The findings suggest that certain working conditions in a licensed site may be safer.
47 CFR 1.2113 - Construction prior to grant of application.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Competitive Bidding Proceedings General Procedures § 1.2113 Construction prior to grant of application. Subject to the provisions of this section, applicants for licenses awarded by competitive bidding may..., applicants must not begin to construct facilities for licenses subject to competitive bidding. (a) When...
47 CFR 1.2113 - Construction prior to grant of application.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Competitive Bidding Proceedings General Procedures § 1.2113 Construction prior to grant of application. Subject to the provisions of this section, applicants for licenses awarded by competitive bidding may..., applicants must not begin to construct facilities for licenses subject to competitive bidding. (a) When...
Regulatory requirements for nuclear power plant site selection in Malaysia-a review.
Basri, N A; Hashim, S; Ramli, A T; Bradley, D A; Hamzah, K
2016-12-01
Malaysia has initiated a range of pre-project activities in preparation for its planned nuclear power programme. Clearly one of the first steps is the selection of sites that are deemed suitable for the construction and operation of a nuclear power plant. Here we outline the Malaysian regulatory requirements for nuclear power plant site selection, emphasizing details of the selection procedures and site characteristics needed, with a clear focus on radiation safety and radiation protection in respect of the site surroundings. The Malaysia Atomic Energy Licensing Board (AELB) site selection guidelines are in accord with those provided in International Atomic Energy Agency (IAEA) and United Stated Nuclear Regulatory Commission (USNRC) documents. To enhance the suitability criteria during selection, as well as to assist in the final decision making process, possible assessments using the site selection characteristics and information are proposed.
24 CFR 3286.203 - Installation license required.
Code of Federal Regulations, 2010 CFR
2010-04-01
... emergency housing after a natural disaster; or (7) Work performed at the home site that is not covered by...) The installer must display an original or a copy of a valid installation license at the site of the... installation license is not required for: (1) Site preparation that is not subject to the requirements of part...
10 CFR 72.210 - General license issued.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...
10 CFR 72.210 - General license issued.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.210 General license issued. A general license is... reactor sites to persons authorized to possess or operate nuclear power reactors under 10 CFR part 50 or...
10 CFR 50.52 - Combining licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Combining licenses. 50.52 Section 50.52 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of Licenses and Construction Permits § 50.52 Combining licenses. The Commission may combine in a...
14 CFR 420.15 - Information requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 420.15 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.15 Information requirements. (a) General—(1) Launch site operator. An...
14 CFR 420.15 - Information requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 420.15 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.15 Information requirements. (a) General—(1) Launch site operator. An...
The costs and benefits of library site licenses to academic journals
Bergstrom, Carl T.; Bergstrom, Theodore C.
2004-01-01
Scientific publishing is rapidly shifting from a paper-based system to one of predominantly electronic distribution, in which universities purchase site licenses for online access to journal contents. Will these changes necessarily benefit the scientific community? By using basic microeconomics and elementary statistical theory, we address this question and find a surprising answer. If a journal is priced to maximize the publisher's profits, scholars on average are likely to be worse off when universities purchase site licenses than they would be if access were by individual subscriptions only. However, site licenses are not always disadvantageous. Journals issued by professional societies and university presses are often priced so as to maximize subscriptions while recovering average costs. When such journals are sustained by institutional site licenses, the net benefits to the scientific community are larger than if these journals are sold only by individual subscriptions. PMID:14715902
The costs and benefits of library site licenses to academic journals.
Bergstrom, Carl T; Bergstrom, Theodore C
2004-01-20
Scientific publishing is rapidly shifting from a paper-based system to one of predominantly electronic distribution, in which universities purchase site licenses for online access to journal contents. Will these changes necessarily benefit the scientific community? By using basic microeconomics and elementary statistical theory, we address this question and find a surprising answer. If a journal is priced to maximize the publisher's profits, scholars on average are likely to be worse off when universities purchase site licenses than they would be if access were by individual subscriptions only. However, site licenses are not always disadvantageous. Journals issued by professional societies and university presses are often priced so as to maximize subscriptions while recovering average costs. When such journals are sustained by institutional site licenses, the net benefits to the scientific community are larger than if these journals are sold only by individual subscriptions.
10 CFR 60.41 - Standards for issuance of a license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REPOSITORIES Licenses License Issuance and Amendment § 60.41 Standards for issuance of a license. A license to receive and possess source, special nuclear, or byproduct material at a geologic repository operations area may be issued by the Commission upon finding that: (a) Construction of the geologic repository...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arnold, Bill Walter; Chang, Fu-lin; Mattie, Patrick D.
2006-02-01
Sandia National Laboratories (SNL) and Taiwan's Institute for Nuclear Energy Research (INER) have teamed together to evaluate several candidate sites for Low-Level Radioactive Waste (LLW) disposal in Taiwan. Taiwan currently has three nuclear power plants, with another under construction. Taiwan also has a research reactor, as well as medical and industrial wastes to contend with. Eventually the reactors will be decomissioned. Operational and decommissioning wastes will need to be disposed in a licensed disposal facility starting in 2014. Taiwan has adopted regulations similar to the US Nuclear Regulatory Commission's (NRC's) low-level radioactive waste rules (10 CFR 61) to govern themore » disposal of LLW. Taiwan has proposed several potential sites for the final disposal of LLW that is now in temporary storage on Lanyu Island and on-site at operating nuclear power plants, and for waste generated in the future through 2045. The planned final disposal facility will have a capacity of approximately 966,000 55-gallon drums. Taiwan is in the process of evaluating the best candidate site to pursue for licensing. Among these proposed sites there are basically two disposal concepts: shallow land burial and cavern disposal. A representative potential site for shallow land burial is located on a small island in the Taiwan Strait with basalt bedrock and interbedded sedimentary rocks. An engineered cover system would be constructed to limit infiltration for shallow land burial. A representative potential site for cavern disposal is located along the southeastern coast of Taiwan in a tunnel system that would be about 500 to 800 m below the surface. Bedrock at this site consists of argillite and meta-sedimentary rocks. Performance assessment analyses will be performed to evaluate future performance of the facility and the potential dose/risk to exposed populations. Preliminary performance assessment analyses will be used in the site-selection process and to aid in design of the disposal system. Final performance assessment analyses will be used in the regulatory process of licensing a site. The SNL/INER team has developed a performance assessment methodology that is used to simulate processes associated with the potential release of radionuclides to evaluate these sites. The following software codes are utilized in the performance assessment methodology: GoldSim (to implement a probabilistic analysis that will explicitly address uncertainties); the NRC's Breach, Leach, and Transport - Multiple Species (BLT-MS) code (to simulate waste-container degradation, waste-form leaching, and transport through the host rock); the Finite Element Heat and Mass Transfer code (FEHM) (to simulate groundwater flow and estimate flow velocities); the Hydrologic Evaluation of Landfill performance Model (HELP) code (to evaluate infiltration through the disposal cover); the AMBER code (to evaluate human health exposures); and the NRC's Disposal Unit Source Term -- Multiple Species (DUST-MS) code (to screen applicable radionuclides). Preliminary results of the evaluations of the two disposal concept sites are presented.« less
Wage and Hour Administration, Alaska Department of Labor
Preference Enforcement; Licensing Employment Agencies; Construction Contractor Licensing; and Alaska Family Contractor Licensing program protects the public from unlicensed, unbonded contractors, while protecting
47 CFR 73.3500 - Application and report forms.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Wireless Telecommunications Bureau Application for Assignments of Authorization and Transfers of Control... Station Construction Permit or License. 315 Application for Consent to Transfer of Control of Corporation... Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast...
Code of Federal Regulations, 2010 CFR
2010-01-01
... disposed. In such cases, the Commission shall grant a license permitting use of the land if it finds that... the disposal site to be licensed, including documentation on whether land and interests are owned by the United States or an Indian tribe. If the site is on Indian land, then, as specified in the Uranium...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... Company; Turkey Point, Units 6 and 7; Combined License Application, Notice of Intent To Prepare an... application for a combined license (COL) to build Units 6 and 7 at its Turkey Point site, located in Miami... approximately 4.5 miles from the nearest boundary of the Turkey Point site; the site is approximately 25 miles...
Andersson, Pål; Stark, Karolina; Xu, Shulan; Nordén, Maria; Dverstorp, Björn
2017-11-01
For the first time, a system for specific consideration of radiological environmental protection has been applied in a major license application in Sweden. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a geological repository for spent nuclear fuel at the Forsmark site. The license application is supported by a post-closure safety assessment, which in accordance with regulatory requirements includes an assessment of environmental consequences. SKB's environmental risk assessment uses the freely available ERICA Tool. Environmental media activity concentrations needed as input to the tool are calculated by means of complex biosphere modelling based on site-specific information gathered from site investigations, as well as from supporting modelling studies and projections of future biosphere conditions in response to climate change and land rise due to glacial rebound. SKB's application is currently being reviewed by the Swedish Radiation Safety Authority (SSM). In addition to a traditional document review with an aim to determine whether SKB's models are relevant, correctly implemented and adequately parametrized, SSM has performed independent modelling in order to gain confidence in the robustness of SKB's assessment. Thus, SSM has used alternative stylized reference biosphere models to calculate environmental activity concentrations for use in subsequent exposure calculations. Secondly, an alternative dose model (RESRAD-BIOTA) is used to calculate doses to biota that are compared with SKB's calculations with the ERICA tool. SSM's experience from this review is that existing tools for environmental dose assessment are possible to use in order to show compliance with Swedish legislation. However, care is needed when site representative species are assessed with the aim to contrast them to generic reference organism. The alternative modelling of environmental concentrations resulted in much lower concentrations compared to SKB's results. However, SSM judges that SKB's in this part conservative approach is relevant for a screening assessment. SSM also concludes that there are big differences in dose rates calculated to different organisms depending on which tool that is used, although not systematically higher for either of them. Finally, independent regulatory modelling has proven valuable for SSM's review in gaining understanding and confidence in SKB's assessment presented in the license application. Copyright © 2017 Elsevier Ltd. All rights reserved.
A method for independent modelling in support of regulatory review of dose assessments.
Dverstorp, Björn; Xu, Shulan
2017-11-01
Several countries consider geological disposal facilities as the preferred option for spent nuclear fuel due to their potential to provide isolation from the surface environment on very long timescales. In 2011 the Swedish Nuclear Fuel & Waste Management Co. (SKB) submitted a license application for construction of a spent nuclear fuel repository. The disposal method involves disposing spent fuel in copper canisters with a cast iron insert at about 500 m depth in crystalline basement rock, and each canister is surrounded by a buffer of swelling bentonite clay. SKB's license application is supported by a post-closure safety assessment, SR-Site. SR-Site has been reviewed by the Swedish Radiation Safety Authority (SSM) for five years. The main method for review of SKB's license application is document review, which is carried out by SSM's staff and supported by SSM's external experts. The review has proven a challenging task due to its broad scope, complexity and multidisciplinary nature. SSM and its predecessors have, for several decades, been developing independent models to support regulatory reviews of post-closure safety assessments for geological repositories. For the review of SR-Site, SSM has developed a modelling approach with a structured application of independent modelling activities, including replication modelling, use of alternative conceptual models and bounding calculations, to complement the traditional document review. This paper describes this scheme and its application to biosphere and dose assessment modelling. SSM's independent modelling has provided important insights regarding quality and reasonableness of SKB's rather complex biosphere modelling and has helped quantifying conservatisms and highlighting conceptual uncertainty. Copyright © 2017 Elsevier Ltd. All rights reserved.
EIS No. 20100312 EIS Comanche Peak Nuclear Power Plant Units 3 and 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bjornstad, David J
2010-08-01
In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31,more » 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant Units 3 and 4, Application for Combined Licenses (COLs) for Construction Permits and Operating Licenses, (NUREG-1943), Hood and Somervell Counties, TX, Comment Period Ends: 10/26/2010.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27more » (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.« less
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
10 CFR 40.33 - Issuance of a license for a uranium enrichment facility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Issuance of a license for a uranium enrichment facility... License Applications § 40.33 Issuance of a license for a uranium enrichment facility. (a) The Commission... the licensing of the construction and operation of a uranium enrichment facility. The Commission will...
Site Operators License: Guidelines for Applicants
DOT National Transportation Integrated Search
1995-08-08
The U. S. Department of Transportation's Office of Commercial Space : Transportation (OCST) issues site operator licenses based on the site : operator's demonstration of the ability to ensure public safety and the : safety of property, both on and of...
14 CFR 420.47 - License modification.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false License modification. 420.47 Section 420.47 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE License Terms and Conditions § 420.47 License...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... Facility Operating Licenses Involving No Significant Hazards Considerations Background Pursuant to Section... authority to issue and make immediately effective any amendment to an operating license upon a determination... electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site http://www...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-16
... Limited Work Authorizations AGENCY: Nuclear Regulatory Commission. ACTION: Notice of hearing. SUMMARY: The... Southern Nuclear Operating Company for two combined licenses (COLs) seeking approval to construct and...), as well as for two limited work authorizations (LWAs) to engage in selected construction activities...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...
18 CFR 4.1 - Initial cost statement.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each initial license for an earth... the earth station must be completed and the station must be brought into operation within 12 months...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile earth stations, shall specify as a condition therein the period in...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...
47 CFR 25.133 - Period of construction; certification of commencement of operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period of construction; certification of commencement of operation. (a)(1) Each license for an earth station governed by this part, except for mobile satellite earth station terminals (METs), shall specify as a...
Cancer Research Center Indiana University School of Medicine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-08-01
The Department of Energy (DOE) proposes to authorize the Indiana School of Medicine to proceed with the detailed design, construction and equipping of the proposed Cancer Research Center (CRC). A grant was executed with the University on April 21, 1992. A four-story building with basement would be constructed on the proposed site over a 24-month period. The proposed project would bring together, in one building, three existing hematology/oncology basic research programs, with improved cost-effectiveness through the sharing of common resources. The proposed site is currently covered with asphaltic pavement and is used as a campus parking lot. The surrounding areamore » is developed campus, characterized by buildings, walkways, with minimal lawns and plantings. The proposed site has no history of prior structures and no evidence of potential sources of prior contamination of the soil. Environmental impacts of construction would be limited to minor increases in traffic, and the typical noises associated with standard building construction. The proposed CRC project operation would involve the use radionuclides and various hazardous materials in conducting clinical studies. Storage, removal and disposal of hazardous wastes would be managed under existing University programs that comply with federal and state requirements. Radiological safety programs would be governed by Nuclear Regulatory Commission (NRC) license and applicable Environmental Protection Agency (EPA) regulations. There are no other NEPA reviews currently active which are in relationship to this proposed site. The proposed project is part of a Medical Campus master plan and is consistent with applicable local zoning and land use requirements.« less
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false General license for custody and long-term care of residual... residual radioactive material disposal sites. (a) A general license is issued for the custody of and long... water characterization and any necessary ground water protection activities or strategies. This...
Code of Federal Regulations, 2010 CFR
2010-01-01
... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF... Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part 52... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or...
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false License required; limited work authorization. 50.10... FACILITIES Requirement of License, Exceptions § 50.10 License required; limited work authorization. (a... permit, early site permit authorizing limited work authorization activities, combined license, or limited...
47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.
Code of Federal Regulations, 2014 CFR
2014-10-01
.... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...
47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...
47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... square kilometers or 37.5 percent of the United States population within five years of the issuance of... United States population within ten years of the issuance of its initial license. Licensees may, in the...
47 CFR 25.113 - Station licenses and launch authority.
Code of Federal Regulations, 2013 CFR
2013-10-01
... is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is...) Construction permits are not required for U.S.-licensed space stations. Construction of such stations may...
47 CFR 73.3536 - Application for license to cover construction permit.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...
47 CFR 73.3536 - Application for license to cover construction permit.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...
47 CFR 73.3536 - Application for license to cover construction permit.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...
47 CFR 73.3536 - Application for license to cover construction permit.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...
47 CFR 73.3536 - Application for license to cover construction permit.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Low Power TV, TV Translator or TV Booster Station License.” (5) FCC Form 350, “Application for an FM Translator or FM Booster Station License.” (6) FCC Form 319, “Application for a Low Power FM Broadcast...
10 CFR 60.7 - License not required for certain preliminary activities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... WASTES IN GEOLOGIC REPOSITORIES General Provisions § 60.7 License not required for certain preliminary... repository: (a) For purposes of site characterization; or (b) For use, during site characterization or...
31 CFR 552.501 - General and specific licensing procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... provisions relating to licensing procedures, see part 501, subpart E of this chapter. Licensing actions taken... actions taken pursuant to this part. General licenses and statements of licensing policy relating to this part also may be available through the Yemen sanctions page on OFAC's Web site: www.treasury.gov/ofac. ...
31 CFR 552.501 - General and specific licensing procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... provisions relating to licensing procedures, see part 501, subpart E of this chapter. Licensing actions taken... actions taken pursuant to this part. General licenses and statements of licensing policy relating to this part also may be available through the Yemen sanctions page on OFAC's Web site: www.treasury.gov/ofac. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-27
... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... Docket ID NRC-2012-0283. You may submit comments by the following methods: Federal rulemaking Web site...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations... Commission the authority to issue and make immediately effective any amendment to an operating license or... ID NRC-2012-0131. You may submit comments by the following methods: Federal Rulemaking Web site: Go...
47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...
47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...
47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.
Code of Federal Regulations, 2013 CFR
2013-10-01
... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...
47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.
Code of Federal Regulations, 2014 CFR
2014-10-01
... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...
47 CFR 90.665 - Authorization, construction and implementation of MTA licenses.
Code of Federal Regulations, 2011 CFR
2011-10-01
... years from the date of license grant, construct and place into operation a sufficient number of base stations to provide coverage to at least one-third of the population of the MTA; further, each MTA licensee must provide coverage to at least two-thirds of the population of the MTA five years from the date of...
47 CFR 90.767 - Construction and implementation of EA and Regional licenses.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations for land mobile and/or paging operations) to provide coverage to at least one-third of the population... the population of its EA or REAG within ten years of the issuance of its initial license. Licensees...
47 CFR 90.767 - Construction and implementation of EA and Regional licenses.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations for land mobile and/or paging operations) to provide coverage to at least one-third of the population... the population of its EA or REAG within ten years of the issuance of its initial license. Licensees...
47 CFR 90.767 - Construction and implementation of EA and Regional licenses.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations for land mobile and/or paging operations) to provide coverage to at least one-third of the population... the population of its EA or REAG within ten years of the issuance of its initial license. Licensees...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part...
Current Status of the Nuclear Waste Management Programme in Finland - 13441
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehto, Kimmo; Vuorio, Petteri
2013-07-01
Pursuant to the Decision-in-Principle of 2001 the Finnish programme for geologic disposal of spent fuel has now moved to the phase of applying for construction licence to build up the encapsulation plant and underground repository. The main objective of former programme phase, underground characterisation phase, was to confirm - or refute - the suitability of the Olkiluoto site by investigations conducted underground at the actual depth of the repository. The construction work of the access tunnel to the rock characterisation facility (ONKALO) started in the late summer of 2004. The site research and investigations work aimed at the maturity neededmore » for submission of the application for construction license of the actual repository in end of 2012. This requires, however, that also the technology has reached the maturity needed. The design and technical plans form the necessary platform for the development of the safety case for spent fuel disposal. A plan, 'road map', has been produced for the portfolio of reports that demonstrates the safety of disposal as required by the criteria set by the government and further detailed by the safety authority, STUK. (authors)« less
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false General license for custody and long-term care of uranium... long-term care of uranium or thorium byproduct materials disposal sites. (a) A general license is... in this part for uranium or thorium mill tailings sites closed under title II of the Uranium Mill...
10 CFR 60.22 - Filing and distribution of application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GEOLOGIC REPOSITORIES Licenses License Applications § 60.22 Filing and distribution of application. (a) An application for a construction authorization for a high-level radioactive waste repository at a geologic repository operations area, and an application for a license to receive and possess source, special nuclear...
10 CFR 52.171 - Finality of manufacturing licenses; information requests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... required for issuance of a construction permit, operating license, combined license, in any hearing under... manufactured reactor, the costs and benefits of severe accident mitigation design alternatives, and the bases for not incorporating severe accident mitigation design alternatives into the design of the reactor to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-08
... permit, operating license, operating license renewal, early site review, design certification review... available on the NRC home page site for 60 days after the signature date of this notice. Comments and...
31 CFR 558.305 - Licenses; general and specific.
Code of Federal Regulations, 2014 CFR
2014-07-01
... made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license means any... available on OFAC's Web site: www.treasury.gov/ofac. Note to § 558.305: See § 501.801 of this chapter on...
31 CFR 537.310 - Licenses; general and specific.
Code of Federal Regulations, 2014 CFR
2014-07-01
... part or are made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license... part or made available on OFAC's Web site. Note to § 537.310: See § 501.801 of this chapter on...
23 CFR 635.110 - Licensing and qualification of contractors.
Code of Federal Regulations, 2010 CFR
2010-04-01
... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.110 Licensing and qualification... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... of a bid or before the bid may be considered for award of a contract. This, however, is not intended...
Code of Federal Regulations, 2012 CFR
2012-10-01
... license gives the licensee authority to construct and operate any number of base stations anywhere within the area authorized by the license, except as follows: (1) A station is required to be individually... assessment is required under § 1.1307 of this chapter; or (iii) The station would affect areas identified in...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE General § 420.1 Scope. This part prescribes the information and demonstrations that must be provided to the FAA as part of a license application, the bases for license approval...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE General § 420.1 Scope. This part prescribes the information and demonstrations that must be provided to the FAA as part of a license application, the bases for license approval...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamationmore » and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov« less
31 CFR 542.309 - Licenses; general and specific.
Code of Federal Regulations, 2014 CFR
2014-07-01
... part or made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license means... or made available on OFAC's Web site: www.treasury.gov/ofac. Note to § 542.309: See § 501.801 of this...
31 CFR 589.305 - Licenses; general and specific.
Code of Federal Regulations, 2014 CFR
2014-07-01
... part or made available on OFAC's Web site: www.treasury.gov/ofac. (c) The term specific license means... or made available on OFAC's Web site: www.treasury.gov/ofac. Note to § 589.305: See § 501.801 of this...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false General license for custody and long-term care of uranium or thorium byproduct materials disposal sites. 40.28 Section 40.28 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL General Licenses § 40.28 General license for custody and...
14 CFR 420.17 - Bases for issuance of a license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Bases for issuance of a license. 420.17 Section 420.17 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements...
14 CFR 420.32-420.40 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-01-01
....40 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License §§ 420.32-420.40 [Reserved] ...
14 CFR 420.32-420.40 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
....40 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License §§ 420.32-420.40 [Reserved] ...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part 52 § 2.623 Notice of...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Combined License Under 10 Cfr Part 52 § 2.623 Notice of...
10 CFR 52.83 - Finality of referenced NRC approvals; partial initial decision on site suitability.
Code of Federal Regulations, 2010 CFR
2010-01-01
....145, and 52.171. (b) While a partial decision on site suitability is in effect under 10 CFR 2.617(b)(2... decision on site suitability. 52.83 Section 52.83 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.83 Finality of referenced NRC...
10 CFR 52.83 - Finality of referenced NRC approvals; partial initial decision on site suitability.
Code of Federal Regulations, 2012 CFR
2012-01-01
....145, and 52.171. (b) While a partial decision on site suitability is in effect under 10 CFR 2.617(b)(2... decision on site suitability. 52.83 Section 52.83 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Combined Licenses § 52.83 Finality of referenced NRC...
43 CFR 3273.13 - What lands are not available for geothermal site licenses?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What lands are not available for geothermal site licenses? 3273.13 Section 3273.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING How To Apply for a Site...
43 CFR 3273.13 - What lands are not available for geothermal site licenses?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What lands are not available for geothermal site licenses? 3273.13 Section 3273.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING How To Apply for a Site...
43 CFR 3273.13 - What lands are not available for geothermal site licenses?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What lands are not available for geothermal site licenses? 3273.13 Section 3273.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING How To Apply for a Site...
43 CFR 3273.13 - What lands are not available for geothermal site licenses?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What lands are not available for geothermal site licenses? 3273.13 Section 3273.13 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING How To Apply for a Site...
14 CFR 417.9 - Launch site responsibility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch site responsibility. 417.9 Section 417.9 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY General and License Terms and Conditions § 417.9 Launch...
14 CFR 417.9 - Launch site responsibility.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Launch site responsibility. 417.9 Section 417.9 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY General and License Terms and Conditions § 417.9 Launch...
14 CFR 433.9 - Environmental information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental information. 433.9 Section..., DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.9 Environmental information. An applicant shall submit environmental information concerning a proposed reentry site not covered by...
18 CFR 12.2 - Rules of construction.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... Licensing determines that compliance with the relevant provision of the license will better protect life...
10 CFR 72.40 - Issuance of license.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Issuance of license. 72.40 Section 72.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... complies with the criteria in subpart E; (3) If on the site of a nuclear power plant or other licensed...
10 CFR 72.40 - Issuance of license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Issuance of license. 72.40 Section 72.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... complies with the criteria in subpart E; (3) If on the site of a nuclear power plant or other licensed...
10 CFR 72.40 - Issuance of license.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Issuance of license. 72.40 Section 72.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... complies with the criteria in subpart E; (3) If on the site of a nuclear power plant or other licensed...
10 CFR 72.40 - Issuance of license.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Issuance of license. 72.40 Section 72.40 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... complies with the criteria in subpart E; (3) If on the site of a nuclear power plant or other licensed...
ERIC Educational Resources Information Center
Aguirre-Garzón, Edgar Augusto; Castañeda-Peña, Harold Andrés
2017-01-01
Research has accumulated important knowledge over recent decades on how licensed language teachers develop and learn from cognitive and socio-cultural stances. Yet, relatively little evidence exists on how non-licensed-in-English language teachers (NLELTs) grow professionally in their communities. Similarly, few studies have yet investigated the…
10 CFR 50.13 - Attacks and destructive acts by enemies of the United States; and defense activities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Requirement of License, Exceptions § 50.13 Attacks and... construct and operate a production or utilization facility, or for an amendment to such license, is not required to provide for design features or other measures for the specific purpose of protection against...
10 CFR 140.94 - Appendix D-Form of indemnity agreement with Federal agencies.
Code of Federal Regulations, 2011 CFR
2011-01-01
... (hereinafter referred to as the Act). Article I As used in this agreement, 1. Nuclear reactor, byproduct... irradiated or to be irradiated by, the nuclear reactor or reactors subject to the license or licenses... construction of a nuclear reactor with respect to which no operating license has been issued by the Nuclear...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-21
... William States Lee III Nuclear Station Site, Units 1 and 2; Duke Energy Carolinas, LLC AGENCY: Nuclear... Statement for Combined Licenses (COL) for William States Lee III Nuclear Station Units 1 and 2 [Lee Nuclear... draft EIS can be accessed online at the NRC's William States Lee III Nuclear Site Web page at http://www...
43 CFR 3273.12 - How will BLM review my site license application?
Code of Federal Regulations, 2011 CFR
2011-10-01
...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE... information. (b) If your site license is located on geothermal leases where the surface is managed by the... requested by the Federal Energy Regulatory Commission. (d) If another Federal agency manages the surface, we...
Waste Handeling Building Conceptual Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
G.W. Rowe
2000-11-06
The objective of the ''Waste Handling Building Conceptual Study'' is to develop proposed design requirements for the repository Waste Handling System in sufficient detail to allow the surface facility design to proceed to the License Application effort if the proposed requirements are approved by DOE. Proposed requirements were developed to further refine waste handling facility performance characteristics and design constraints with an emphasis on supporting modular construction, minimizing fuel inventory, and optimizing facility maintainability and dry handling operations. To meet this objective, this study attempts to provide an alternative design to the Site Recommendation design that is flexible, simple, reliable,more » and can be constructed in phases. The design concept will be input to the ''Modular Design/Construction and Operation Options Report'', which will address the overall program objectives and direction, including options and issues associated with transportation, the subsurface facility, and Total System Life Cycle Cost. This study (herein) is limited to the Waste Handling System and associated fuel staging system.« less
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Construction authorization. 63.31 Section 63.31 Energy... REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization... part, the Commission may authorize construction of a geologic repository operations area at the Yucca...
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Construction authorization. 60.31 Section 60.31 Energy... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... authorize construction if it determines: (a) Safety. That there is reasonable assurance that the types and...
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Construction authorization. 60.31 Section 60.31 Energy... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... authorize construction if it determines: (a) Safety. That there is reasonable assurance that the types and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
..., LLC; William States Lee III Combined License Application; Notice of Intent To Conduct a Supplemental... an application for combined licenses (COL) for its William States Lee III Nuclear Station (Lee) site.../new-licensing/col/lee.html . In addition, the Cherokee County Public Library, 300 E. Rutledge Avenue...
Code of Federal Regulations, 2010 CFR
2010-10-01
... as the applicant; (2) Any application to assign or transfer a license for a Phase I, non-nationwide... assign a license for a Phase I nationwide system before the licensee has constructed at least 40 percent... request to amend an application or to transfer or assign a license does not involve a substantial change...
Code of Federal Regulations, 2011 CFR
2011-10-01
... as the applicant; (2) Any application to assign or transfer a license for a Phase I, non-nationwide... assign a license for a Phase I nationwide system before the licensee has constructed at least 40 percent... request to amend an application or to transfer or assign a license does not involve a substantial change...
33 CFR Appendix B to Part 221 - Federal Energy Regulatory Commission Form L-3 (Revised October 1975)
Code of Federal Regulations, 2010 CFR
2010-07-01
... license for constructed major project affecting navigable waters of the united states Article 1. The..., terms, and conditions of the license. Article 2. No substantial change shall be made in the maps, plans... theretofore made a part of the license as may be specified by the Commission. Article 3. The project area and...
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Construction authorization. 60.31 Section 60.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and...
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Construction authorization. 60.31 Section 60.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and...
18 CFR 4.202 - Alteration and extension of license.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...
18 CFR 4.202 - Alteration and extension of license.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...
18 CFR 4.202 - Alteration and extension of license.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...
18 CFR 4.202 - Alteration and extension of license.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...
18 CFR 4.202 - Alteration and extension of license.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Application for Amendment of License § 4.202 Alteration and... construction of project works must be filed with the Commission not less than three months prior to the date or...
31 CFR 589.501 - General and specific licensing procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... chapter. Licensing actions taken pursuant to part 501 of this chapter with respect to the prohibitions contained in this part are considered actions taken pursuant to this part. General licenses and statements... page on OFAC's Web site: www.treasury.gov/ofac. ...
14 CFR 420.41 - License to operate a launch site-general.
Code of Federal Regulations, 2010 CFR
2010-01-01
... does it confer any proprietary, property, or exclusive right in the use of airspace or outer space. ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...
14 CFR 420.41 - License to operate a launch site-general.
Code of Federal Regulations, 2011 CFR
2011-01-01
... does it confer any proprietary, property, or exclusive right in the use of airspace or outer space. ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...
14 CFR 420.41 - License to operate a launch site-general.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... regulations; nor does it confer any proprietary, property, or exclusive right in the use of airspace or outer...
14 CFR 420.41 - License to operate a launch site-general.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION... regulations; nor does it confer any proprietary, property, or exclusive right in the use of airspace or outer...
14 CFR 420.41 - License to operate a launch site-general.
Code of Federal Regulations, 2012 CFR
2012-01-01
... does it confer any proprietary, property, or exclusive right in the use of airspace or outer space. ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false License to operate a launch site-general. 420.41 Section 420.41 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
...; Application and Amendment to Facility Operating License Involving Proposed No Significant Hazards... submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and...: Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0139. NRC...
Under the Federal Technology Transfer Act (FTTA), Federal Agencies can patent inventions developed during the course of research. These technologies can then be licensed to businesses or individuals for further development and sale in the marketplace. These technologies relate to treatment of contaminated sites.
This site has moved! Please go to our new Image Gallery site! dot header Contact Us About the Image Galaxy For licensing and other usage questions, please contact: Image use and licensing ! Enter a search term and hit the search button to quickly find an image Go The above "Quick Search
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization... changes to the features of the geologic repository and the procedures authorized. The restrictions that... setting as well as measures related to the design and construction of the geologic repository operations...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 60.32 - Conditions of construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Conditions of construction authorization. 60.32 Section 60.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.32 Conditions of construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...
10 CFR 63.31 - Construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Construction authorization. 63.31 Section 63.31 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.31 Construction authorization...
10 CFR 60.33 - Amendment of construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Amendment of construction authorization. 60.33 Section 60.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Construction Authorization § 60.33 Amendment of construction authorization...
10 CFR 2.1303 - Availability of documents.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1303 Availability of documents. Unless exempt... for a license transfer requiring Commission approval will be placed at the NRC Web site, http://www...
10 CFR 2.1303 - Availability of documents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Procedures for Hearings on License Transfer Applications § 2.1303 Availability of documents. Unless exempt... for a license transfer requiring Commission approval will be placed at the NRC Web site, http://www...
Site Selection for the Disposal of LLW in Taiwan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chuang, W.S.; Chi, L.M.; Tien, N.C.
2006-07-01
This paper presents the implementation status of the low-level radioactive waste (LLW) disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes and preliminary disposal concepts. The first phase of site selection for low-level radioactive waste final disposal in Taiwan was implemented between 1992 and 2002. The site selection process adopted a Geographic Information System (GIS), Hierarchical Analysis System, Expert Evaluation System, and site reconnaissance. An incentive program for voluntary sites was also initiated. After a series of evaluations and discussion of 30 potentialmore » candidate sites, including 8 recommended sites, 5 qualified voluntary townships, and several remote uninhabited small islets, Hsiao-chiou islet was selected as the first priority candidate site in February 1998. The geological investigation work in Hsiao-chiou was conducted from March 1999 through October 2000. An Environmental Impact Statement Report (EIS) and the Investment Feasibility Study Report (IFS) were submitted to the Environmental Protection Agency (EPA) in November 2000 and to the Ministry of Economic Affairs (MOEA) in June 2001, respectively. Unfortunately, the site investigation was discontinued in 2002 due to political and public acceptance consideration. After years of planning, the second phase of the site selection process was launched in August 2004 and will be conducted through 2008. It is planned that a repository will be constructed in early 2009 and start to operate in 2014. The site selection process for the second phase is based on the earlier work and four potential candidate sites were selected for evaluation until 2005. A near surface disposal concept is proposed for a site located in the Taiwan strait, and cavern disposal concepts are proposed for three other sites located on the main island. This paper presents the implementation status of the LLW disposal program in Taiwan, including the disposal facility regulations, status of waste management, final disposal program, licensing procedures, waste acceptance criteria, site selection criteria and processes, and preliminary disposal concepts 'NIMBY' (Not in my backyard) is a critical problem for implementation of the final disposal project. Resistance from local communities has been continuously received during site characterization. To overcome this, an incentive program to encourage community acceptance has been approved by the Government. Programs for community promotion are being proposed and negotiations are also underway. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wade C. Adams
From the mid-1950s until mid-2000, the Combustion Engineering, Inc. (CE) site in Windsor, Connecticut (Figure A-1) was involved in the research, development, engineering, production, and servicing of nuclear fuels, systems, and services. The site is currently undergoing decommissioning that will lead to license termination and unrestricted release in accordance with the requirements of the License Termination Rule in 10 CFR Part 20, Subpart E. Asea Brown Boveri Incorporated (ABB) has been decommissioning the CE site since 2001.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Low-Level Radioactive Waste Policy Amendments Act of 1985 amends the current act to provide regional facilities established through compacts between two or more states. The Act defines the responsibilities of the federal government and the participating states, and provides for inspection by the Nuclear Regulatory Commission and review by Congress. It also establishes procedures for siting and allocation of facilities during the transition period and the requirements for access to regional facilities, which will have a three-year licensing and construction period. There is a graduated ceiling on surcharges until 1992, when the limit is $40 per cubic foot. Themore » Act lists six compacts which are subject to consent.« less
An ontology based trust verification of software license agreement
NASA Astrophysics Data System (ADS)
Lu, Wenhuan; Li, Xiaoqing; Gan, Zengqin; Wei, Jianguo
2017-08-01
When we install software or download software, there will show up so big mass document to state the rights and obligations, for which lots of person are not patient to read it or understand it. That would may make users feel distrust for the software. In this paper, we propose an ontology based verification for Software License Agreement. First of all, this work proposed an ontology model for domain of Software License Agreement. The domain ontology is constructed by proposed methodology according to copyright laws and 30 software license agreements. The License Ontology can act as a part of generalized copyright law knowledge model, and also can work as visualization of software licenses. Based on this proposed ontology, a software license oriented text summarization approach is proposed which performances showing that it can improve the accuracy of software licenses summarizing. Based on the summarization, the underline purpose of the software license can be explicitly explored for trust verification.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-30
..., Washington, DC 20555-0001. Telephone: 301-415-6563; fax number: 301- 415-5369; email: Thomas[email protected] Regulatory Commission. Annette L. Vietti-Cook, Secretary of the Commission. Attachment 1--General Target...
30 CFR 285.618 - What must I do upon completion of approved site assessment activities?
Code of Federal Regulations, 2011 CFR
2011-07-01
... expiration of your site assessment term, you timely submit a COP meeting the requirements of this subpart, or... your COP for approval or FERC reviews your license application for approval. (b) You are not required... your approved COP or approved FERC license. (c) If, following the technical and environmental review of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... reactors or for activities associated with review of applications for early site permits and combined licenses (COL) for the Office of New Reactors (NRO). DATES: The effective date of this SRP update is... Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2010-0138. Address...
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Combined License Under... Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Expiration and termination of licenses and decommissioning of sites and separate buildings or outdoor areas. 30.36 Section 30.36 Energy NUCLEAR REGULATORY... section if the Commission determines that the alternative schedule is necessary to the effective conduct...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greenberg, Raymond; Wright, Kyle A.; McCaw, Erica E.
The Global Threat Reduction Initiative (GTRI) reduces and protects vulnerable nuclear and radiological material located at civilian sites worldwide. Internationally, over 40 countries are cooperating with GTRI to enhance the security of these materials. The GTRI program has worked successfully with foreign countries to remove and protect nuclear and radioactive materials, including orphaned and disused high-activity sources. GTRI began cooperation with the Republic of Colombia in April 2004. This cooperation has been a resounding success by securing forty high-risk sites, consolidating disused/orphan sources at an interim secure national storage facility, and developing a comprehensive approach to security, training, and sustainability.more » In 2005 the Colombian Ministry of Mines and Energy requested the Department of Energy’s support in the construction of a new Central Storage Facility (CSF). In December 2005, the Ministry selected to construct this facility at the Institute of Geology and Mining (Ingeominas) site in Bogota. This site already served as Colombia’s national repository, where disused sources were housed in various buildings around the complex. The CSF project was placed under contract in May 2006, but environmental issues and public protests, which led to a class action lawsuit against the Colombian Government, forced the Ministry to quickly suspend activities, thereby placing the project in jeopardy. Despite these challenges, however, the Ministry of Mines and Energy worked closely with public and environmental authorities to resolve these issues, and continued to be a strong advocate of the GTRI program. In June 2008, the Ministry of Mines and Energy was granted the construction and environmental licenses. As a result, construction immediately resumed and the CSF was completed by December 2008. A commissioning ceremony was held for the new facility in January 2009, which was attended by representatives from the Department of Energy, U.S. Embassy, and the Ministry of Mines and Energy, including the Minister and Vice Minister.« less
Code of Federal Regulations, 2014 CFR
2014-01-01
... Licenses for the Receipt of High-Level Radioactive Waste at a Geologic Repository § 2.1007 Access. (a)(1) A system to provide electronic access to the Licensing Support Network shall be provided at the... provide electronic access to the Licensing Support Network shall be provided at the NRC Web site, http...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Licenses for the Receipt of High-Level Radioactive Waste at a Geologic Repository § 2.1007 Access. (a)(1) A system to provide electronic access to the Licensing Support Network shall be provided at the... provide electronic access to the Licensing Support Network shall be provided at the NRC Web site, http...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Reactor Regulation, Director, Office of New Reactors, or Director, Office of Nuclear Material Safety and... Director, Office of New Reactors, or the Director, Office of Nuclear Reactor Regulation, or the Director..., operating license, early site permit, combined license, or manufacturing license for a nuclear power reactor...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sackschewsky, Michael R.
2004-01-15
The Endangered Species Act (ESA) of 1973 requires that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered (T&E) species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to themore » provisions of the ESA. The Office of Nuclear Reactor Regulation (NRR) staff have performed appropriate assessments of potential impacts to threatened or endangered species, and consulted with appropriate agencies with regard to protection of such species in authorizing the construction, operation, and relicensing of nuclear power generating facilities. However, the assessments and consultations concerning many facilities were performed during the 1970's or early 1980's, and have not been re-evaluated in detail or updated since those initial evaluations. A review of potential Endangered Species Act issues at licensed nuclear power facilities was completed in 1997. In that review 484 different ESA-listed species were identified as potentially occurring near one or more of the 75 facility sites that were examined. An update of the previous T&E species evaluation at this time is desired because, during the intervening 6 years: nearly 200 species have been added to the ESA list, critical habitats have been designated for many of the listed species, and significantly more information is available online, allowing for more efficient high-level evaluations of potential species presence near sites and the potential operation impacts. The updated evaluation included searching the NRC's ADAMS database to find any documents related to T&E species take, consultations, and evaluations of potential effects of operation on T&E species. This search recovered a total of approximately 100 documents from 13 sites. Sites that were in the relicensing or decommissioning processes were excluded from the ADAMS search. In general the ADAMS search did not reveal any serious deficiencies or compliance problems. The most notable finds were reports of takes of green sea turtles at Diablo Canyon. While these events were reported to both the NRC and to NOAA Fisheries, no record of interaction between the two federal agencies was found. Species potentially present at each site were determined via querying the Geographical, Environmental, and Siting Information System (GEn&SIS) database developed for the NRC by Lawrence Livermore National Laboratory. The results of these queries were compared against the 1997 review, and in the cases of sites that were in the relicensing process, with the results of those site specific evaluations. A total of 452 T&E species were identified as potentially occurring near one or more of the operating commercial nuclear power generating plants. Information about each of these species was gathered to support an assessment of the probability of occurrence at each of the reactor sites. Based on the assessments of which species are potentially affected at each site, and the information gathered through the ADAMS search, each site was assigned a priority value for follow-up evaluations. The priority listing did not include any sites that had entered the relicensing process, those where the licensee has indicated that they intend to enter the relicensing process before the end of 2005, or those that have entered the decommissioning process. Of the 39 remaining sites, those that were identified as the highest priority for follow-on evaluations are: Diablo Canyon, San Onofre, Crystal River, Harris, and Vogtle, followed by South Texas, Palo Verde, Salem, and Cooper.« less
Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.
76 FR 56951 - Licenses, Certifications, and Approvals for Materials Licensees
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
... applicants to take action that would have significant environmental impacts with no NRC oversight or... materials license facility to be prepared and significant environmental impacts to occur without undergoing... permit only limited construction activities and the environmental impacts associated with activities...
47 CFR 74.1232 - Eligibility and licensing requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Translator Stations and FM Broadcast Booster Stations § 74.1232 Eligibility and licensing requirements. (a... translator station may be issued to any qualified individual, organized group of individuals, broadcast... the installation and operation of the translator are sufficiently sound to assure prompt construction...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stenson, Ron; Howard, Don
2013-07-01
As Canada's nuclear regulator, the Canadian Nuclear Safety Commission (CNSC) is responsible for licensing all aspects of uranium mining, including remediation activities at legacy sites. Since these sites already existed when the current legislation came into force in 2000, and the previous legislation did not apply, they present a special case. The Nuclear Safety and Control Act (NSCA), was written with cradle-to- grave oversight in mind. Applying the NSCA at the end of a 'facilities' life-cycle poses some challenges to both the regulator and the proponent. When the proponent is the public sector, even more challenges can present themselves. Althoughmore » the licensing process for legacy sites is no different than for any other CNSC license, assuring regulatory compliance can be more complicated. To demonstrate how the CNSC has approached the oversight of legacy sites the history of the Commission's involvement with the Gunnar uranium mine and mill site provides a good case study. The lessons learned from the CNSC's experience regulating the Gunnar site will benefit those in the future who will need to regulate legacy sites under existing or new legislation. (authors)« less
2013-05-10
circulating arboviruses in the region except the Yellow Fever vaccine and Rift Valley Fever vaccine for livestock use only. Early detection of virus...distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/2.0), which permits unrestricted use ...Attribution License (http://creativecommons.org/licenses/by/2.0), which permits unrestricted use , distribution, and reproduction in any medium
Licensing a new industrial irradiator.
Bates, Nicolas K; Entwistle, Frederick B
2010-02-01
After nearly three decades of medical product sterilization, 3M launched a major new project to build and license an irradiator facility. 3M Corporate Health Physics was responsible for the licensing aspect of this project. The licensing process consisted of six amendments, over 30 submissions to the U.S. Nuclear Regulatory Commission (U.S. NRC) and four U.S. NRC site visits. It took approximately 22 months to complete. The six license amendments are reviewed and several of the submissions are discussed. These include 3M's response to the U.S. NRC's interest in the shielding calculations used for the bioshield, the development of a protocol of radiation safety system test methods, and an analysis to show that a dropped cask during loading operations would not fall on sealed sources. A number of lessons were learned during the course of licensing the new irradiator. Among these were the importance of understanding the U.S. NRC license reviewer's perspective, the need to thoroughly review the irradiator manufacturer's licensing package during project negotiations, the benefits of leaving the Health Physics Office and meeting with the non-health physicists involved in the project, and the necessity of maintaining the solid relationships that already existed with the site Radiation Safety Officer and Sterilization Engineer.
Licensing Cases Power Plant Projects Status Power Plants Public Adviser's Office Siting, Transmission, and Watch Phone List Power Plant Licensing Cases Public Adviser Renewables Portfolio Standard Reports and
10 CFR 60.31 - Construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REPOSITORIES Licenses Construction Authorization § 60.31 Construction authorization. Upon review and... in a geologic repository operations area of the design proposed without unreasonable risk to the...: (1) DOE has described the proposed geologic repository including but not limited to: (i) The geologic...
Code of Federal Regulations, 2010 CFR
2010-10-01
... the location of the base station transmitter site of the facility for which they have applied. (2... licensed to them within 64 km (40 mi.) from the location of the base station transmitter site of the... control stations to be placed in operation within the term of the license. (c) [Reserved] (d) All...
Code of Federal Regulations, 2014 CFR
2014-01-01
...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2014-01-01 2014-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...
Code of Federal Regulations, 2013 CFR
2013-01-01
...), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation... 10 Energy 1 2013-01-01 2013-01-01 false Finality of partial decision on site suitability issues in a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION AGENCY RULES...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mountain, D.; Peters, N.; Rafalko, L.
1990-06-01
The Potomac Electric Power Company (PEPCO) has submitted an application to the Maryland Public Service Commission (PSC) for a license to build four combustion turbines on the property of its Chalk Point Generating Station. Environmental impacts of the proposed project are expected to be minimal. The facility will be small relative to the existing Chalk Point station; further, the large size of the overall PEPCO property and the rural character of the vicinity will serve to buffer the effects of the facility. The report discusses PEPCO's requested appropriations for ground water to meet the water needs of the proposed plant,more » and recommends that limitations lower than those requested by the utility be placed on ground water withdrawals. It is recommended that PEPCO be required to create a 23-acre tree preservation zone, or alternatively undertake the reforestation of 23 acres of currently unforested land in the vicinity of the site. PEPCO should also be required to monitor ambient noise levels at the property boundary after construction of the new units is completed, and to coordinate efforts with Prince George's County to alleviate any traffic congestion that may result from construction activities at the plant site.« less
10 CFR 60.3 - License required.
Code of Federal Regulations, 2010 CFR
2010-01-01
... REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES General... byproduct material at a geologic repository operations area except as authorized by a license issued by the Commission pursuant to this part. (b) DOE shall not commence construction of a geologic repository operations...
Telecommunications Network Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1989-05-01
The Office of Civilian Radioactive Waste Management (OCRWM) must, among other things, be equipped to readily produce, file, store, access, retrieve, and transfer a wide variety of technical and institutional data and information. The data and information regularly produced by members of the OCRWM Program supports, and will continue to support, a wide range of program activities. Some of the more important of these information communication-related activities include: supporting the preparation, submittal, and review of a license application to the Nuclear Regulatory Commission (NRC) to authorize the construction of a geologic repository; responding to requests for information from parties affectedmore » by and/or interested in the program; and providing evidence of compliance with all relevant Federal, State, local, and Indian Tribe regulations, statutes, and/or treaties. The OCRWM Telecommunications Network Plan (TNP) is intended to identify, as well as to present the current strategy for satisfying, the telecommunications requirements of the civilian radioactive waste management program. The TNP will set forth the plan for integrating OCRWM`s information resources among major program sites. Specifically, this plan will introduce a telecommunications network designed to establish communication linkages across the program`s Washington, DC; Chicago, Illinois; and Las Vegas, Nevada, sites. The linkages across these and associated sites will comprise Phase I of the proposed OCRWM telecommunications network. The second phase will focus on the modification and expansion of the Phase I network to fully accommodate access to the OCRWM Licensing Support System (LSS). The primary components of the proposed OCRWM telecommunications network include local area networks; extended local area networks; and remote extended (wide) area networks. 10 refs., 6 figs.« less
10 CFR 72.218 - Termination of licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.218 Termination of licenses. (a) The notification regarding the program for the management of spent fuel at the reactor required by § 50.54(bb) of...
10 CFR 72.218 - Termination of licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR FUEL, HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.218 Termination of licenses. (a) The notification regarding the program for the management of spent fuel at the reactor required by § 50.54(bb) of...
76 FR 69295 - Strata Energy, Inc.; Establishment of Atomic Safety and Licensing Board
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
...: Strata Energy, Inc. (Ross In Situ Recovery Uranium Project) This proceeding involves a license... byproduct materials license at its Ross In Situ Recovery Uranium Project site located in Crook County... dated December 29, 1972, published in the Federal Register, 37 FR 28,710 (1972), and the Commission's...
Status of the NRC Decommissioning Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orlando, D. A.; Camper, L.; Buckley, J.
2003-02-24
On July 21, 1997, the U.S. Nuclear Regulatory Commission (NRC) published the final rule on Radiological Criteria for License Termination (the License Termination Rule or LTR) as Subpart E to 10 CFR Part 20. NRC regulations require that materials licensees submit Decommissioning Plans to support the decommissioning of its facility if it is required by license condition, or if the procedures and activities necessary to carry out the decommissioning have not been approved by NRC and these procedures could increase the potential health and safety impacts to the workers or the public. NRC regulations also require that reactor licensees submitmore » Post-shutdown Decommissioning Activities Reports and License Termination Plans to support the decommissioning of nuclear power facilities. This paper provides an update on the status of the NRC's decommissioning program that was presented during WM'02. It discusses the staff's current efforts to streamline the decommissioning process, current issues being faced in the decommissioning program, such as partial site release and restricted release of sites, as well as the status of the decommissioning of complex sites and those listed in the Site Decommissioning Management Plan. The paper discusses the status of permanently shut-down commercial power reactors and the transfer of complex decommissioning sites and sites listed on the SDMP to Agreement States. Finally the paper provides an update of the status of various tools and guidance the NRC is developing to assist licensees during decommissioning, including an effort to consolidate and risk-inform decommissioning guidance.« less
Himanen, Risto; Julin, Ari; Jänkälä, Kalle; Holmberg, Jan-Erik; Virolainen, Reino
2012-11-01
There are four operating nuclear power plant (NPP) units in Finland. The Teollisuuden Voima (TVO) power company has two 840 MWe BWR units supplied by Asea-Atom at the Olkiluoto site. The Fortum corporation (formerly IVO) has two 500 MWe VVER 440/213 units at the Loviisa site. In addition, a 1600 MWe European Pressurized Water Reactor supplied by AREVA NP (formerly the Framatome ANP--Siemens AG Consortium) is under construction at the Olkiluoto site. Recently, the Finnish Parliament ratified the government Decision in Principle that the utilities' applications to build two new NPP units are in line with the total good of the society. The Finnish utilities, Fenno power company, and TVO company are in progress of qualifying the type of the new nuclear builds. In Finland, risk-informed applications are formally integrated in the regulatory process of NPPs that are already in the early design phase and these are to run through the construction and operation phases all through the entire plant service time. A plant-specific full-scope probabilistic risk assessment (PRA) is required for each NPP. PRAs shall cover internal events, area events (fires, floods), and external events such as harsh weather conditions and seismic events in all operating modes. Special attention is devoted to the use of various risk-informed PRA applications in the licensing of Olkiluoto 3 NPP. © 2012 Society for Risk Analysis.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
...) filed an application for transfer of license of the Worthville Dam Project No. 3156, located on the Deep.... See 18 CFR 385.2001(a)(1)(iii)(2008) and the instructions on the Commission's Web site under the ``e... filings please go to the Commission's Web site located at http://www.ferc.gov/filing-comments.asp . More...
Liang, Wenbin; Chikritzhs, Tanya
2011-09-01
Associations between alcohol-related harms and numbers of outlets at the neighbourhood level have been demonstrated; however, the degree to which alcohol consumption or sales plays a part in levels of violence is not clear. This has contributed to uncertainty regarding the actual mechanisms by which outlet density may influence levels of violence. This ecological cross-sectional study investigated the effect of outlet numbers and alcohol sales on the risk of assault in Western Australia. For 2000/2001, information on type, number and wholesale alcohol purchases of all licensed outlets in operation, police-reported assault offences, socioeconomic/demographic data were obtained from official sources. Multivariate negative binomial regression was applied to at local government area level in order to assess associations between outlet density, alcohol sales and violence occurring in both licensed and domestic settings. Average alcohol sales volume per off-site outlet was significantly associated with all measures of assault. Numbers of on-site outlets significantly predicted violence with the exception of assaults occurring at residential premises. Alcohol sales from off-site outlets predicted violence occurring at on-site outlets. The link between on-site outlets and violence may be primarily underpinned by negative amenity effects while off-site outlet effects occur via increased availability. Alcohol sales volumes from off-site outlets influence levels of violence, which occur at both licensed and residential settings. The substantial and wide-ranging effects of liquor stores on alcohol-related harms may have been underestimated in the literature and by policy makers. © 2011 Australasian Professional Society on Alcohol and other Drugs.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.220 Violations. This general license is subject to the...
Code of Federal Regulations, 2010 CFR
2010-01-01
..., HIGH-LEVEL RADIOACTIVE WASTE, AND REACTOR-RELATED GREATER THAN CLASS C WASTE General License for Storage of Spent Fuel at Power Reactor Sites § 72.220 Violations. This general license is subject to the...
... credit: Contains public sector information published by the Health and Safety Executive and licensed under the Open Government Licence v1.0 materials you use at work. Find out more about construction hazards. To receive ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
..., Inc., Ross In Situ Recovery Uranium Project, Crook County, WY; Notice of Materials License Application...-4737, or by e-mail to [email protected] . The Ross In Situ Recovery Uranium Project License... source and byproduct materials license at its Ross In Situ Recovery Uranium Project site located in Crook...
77 FR 31859 - Government-Owned Inventions; Availability for Licensing
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-30
... licensing in the U.S. in accordance with 35 U.S.C. 207 to achieve expeditious commercialization of results... different tilt angles relative to the electron beam are aligned to compensate for mechanical errors of the... into cancer patients. The instant technology includes CAR constructs with one of three different...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
Social Construction of Authorized Users in the Digital Age
ERIC Educational Resources Information Center
Zhu, Xiaohua; Eschenfelder, Kristin R.
2010-01-01
This paper analyzes changes to the definitions of "authorized users" contained in electronic resources licenses and embedded in access control technologies from the mid-1990s to the present. In analyzing changes to the license and technology-based definitions, it tracks shifts in major stakeholders' perceptions of authorized users and…
10 CFR 70.23a - Hearing required for uranium enrichment facility.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Hearing required for uranium enrichment facility. 70.23a... MATERIAL License Applications § 70.23a Hearing required for uranium enrichment facility. The Commission... license for construction and operation of a uranium enrichment facility. The Commission will publish...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... Grant of Exclusive License: Veterinary Vaccines for Rift Valley Fever Virus AGENCY: Centers for Disease... territories other than Africa, in the field of use of veterinary vaccines, to practice the inventions listed... precisely defined attenuated vaccine constructs that contain complete deletions of critical virulence...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... Grant of Co-Exclusive License: Veterinary Vaccines for Rift Valley Fever Virus AGENCY: Centers for... veterinary vaccines, to practice the inventions listed in the patent applications referred to below to... generation of precisely defined attenuated vaccine constructs that contain complete deletions of critical...
47 CFR 27.14 - Construction requirements; Criteria for renewal.
Code of Federal Regulations, 2011 CFR
2011-10-01
... May 1, 2011. With respect to initial BRS licenses issued on or after November 6, 2009, the licensee... record for the relevant license period demonstrates that: (1) The renewal applicant has provided... showing must include: (1) A description of its current service in terms of geographic coverage and...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
47 CFR 25.148 - Licensing provisions for the Direct Broadcast Satellite Service.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.148... contracting for construction of the satellite station(s) within one year of the grant of the authorization. The satellite stations shall also be required to be in operation within six years of the authorization...
77 FR 39521 - Application for a License To Export Nuclear Reactor Major Components and Equipment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-03
... LLC reactor coolant equipment for four constructing four plant May 14, 2012 pumps with motors, APR1400... Emirates. XR176 monitoring and plant in Braka. 110060011 control equipment, auxiliary equipment and... NUCLEAR REGULATORY COMMISSION Application for a License To Export Nuclear Reactor Major Components...
Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2008-03-26
This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review ofmore » an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.« less
7 CFR 1724.32 - Inspection and certification of work order construction.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND... construction. The provisions of this section apply to all borrower electric system facilities regardless of the... performed within 6 months of the completion of construction, and are performed by a licensed engineer...
7 CFR 1724.32 - Inspection and certification of work order construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND... construction. The provisions of this section apply to all borrower electric system facilities regardless of the... performed within 6 months of the completion of construction, and are performed by a licensed engineer...
10 CFR 63.33 - Amendment of construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...
10 CFR 63.33 - Amendment of construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...
10 CFR 63.32 - Conditions of construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...
10 CFR 63.32 - Conditions of construction authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...
10 CFR 63.32 - Conditions of construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...
10 CFR 63.33 - Amendment of construction authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...
10 CFR 63.33 - Amendment of construction authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...
10 CFR 63.33 - Amendment of construction authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Amendment of construction authorization. 63.33 Section 63.33 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.33 Amendment of...
10 CFR 63.32 - Conditions of construction authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Conditions of construction authorization. 63.32 Section 63.32 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Construction Authorization § 63.32 Conditions of...
Lybecker, Kristina M; Fowler, Elisabeth
2009-01-01
This paper examines two recent examples of compulsory licensing legislation: one globally embraced regime and one internationally controversial regime operating under the same WTO rules. In particular, we consider Canadian legislation and the use of compulsory licensing for HIV/AIDS drugs destined for a developing country. This is then contrasted with the conditions under which Thai authorities are pursuing compulsory licenses, the outcomes of their compulsory licenses, as well as the likely impact of the Thai policy. Finally, we construct a rubric to evaluate characteristics of a successful regime. This is used to analyze the Canadian and Thai regimes and frame the expected implications of each national policy. It is hoped that the assessment will guide changes to compulsory licensing design to ensure that legitimate regimes are embraced while illegitimate ones are disallowed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-18
... viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc.gov/docs-filing... Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License, and Soliciting Comments... System, LLC (transferee) filed an application for transfer of license for the M.S.C. Power Project, FERC...
47 CFR 27.14 - Construction requirements; Criteria for renewal.
Code of Federal Regulations, 2010 CFR
2010-10-01
... expectancy, which is the most important comparative factor to be considered in the proceeding, if its past... “substantial” service during its past license term; and (2) The renewal applicant has substantially complied... of each of their license authorizations no later than June 13, 2013 (or within four years of initial...
47 CFR 25.113 - Station licenses and launch authority.
Code of Federal Regulations, 2012 CFR
2012-10-01
.... Construction of such stations may commence prior to grant of a license at the applicant's own risk. Applicants... is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected structure(s). If no such number has been assigned at the time the application is...
47 CFR 73.865 - Assignment and transfer of LPFM licenses.
Code of Federal Regulations, 2012 CFR
2012-10-01
... transfer an LPFM construction permit at any time. (e) Transfers of control involving a sudden change of... 47 Telecommunication 4 2012-10-01 2012-10-01 false Assignment and transfer of LPFM licenses. 73... SERVICES RADIO BROADCAST SERVICES Low Power FM Broadcast Stations (LPFM) § 73.865 Assignment and transfer...
10 CFR 50.63 - Loss of all alternating current power.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., Limitations, and Conditions of Licenses and Construction Permits § 50.63 Loss of all alternating current power... manufacturing license under part 52 of this chapter must be able to withstand for a specified duration and recover from a station blackout as defined in § 50.2. The specified station blackout duration shall be...
Disposition of Chicago Pile 5 (CP-5) Converter Tubes in the 10-160B Cask
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pancake, Daniel C.; Rock, Cynthia
This paper will focus on the unique characterization, packaging, and transportation issues associated with the disposition of the two CP-5 Converter Tube assemblies from Argonne National Laboratory. The converter tubes were constructed of combinations of HEU and alloys of zirconium, and were part of the original research facilities attached to the CP-5 reactor during operating evolutions. These assemblies were heavily irradiated during their operational lifetime, and were segregated from the balance of irradiated test specimens when the reactor was deactivated and slated for Decontamination and Demolition (D&D). In addition, the substantial contribution of fissile material to the assemblies’ inventory mademore » the potential disposition pathways extremely challenging. As a result, these items became part of Argonne’s legacy “nuclear footprint”, and were added to the Nuclear Footprint Reduction Project scope for disposition. The Project was responsible for the size reduction and characterization of these items, as well as the ultimate disposition. After negotiating a disposal pathway for these tubes, there were significant transportation issues that required a small team to overcome, in order to successfully ship these items to the Nevada National Security Site (NNSS). The Project team at Argonne, technical support from transportation specialists, licensing support from the 10-160B license owner, the Savanah River National Lab (SRNL) Packaging Certification Team (PCT, and the DOE EM-33 staff contributed to license and safety analysis report amendments that eventually authorized the shipment of the material. The paper will identify the organizations, and the specific actions, required to successfully make three “one of a kind” shipments of irradiated test specimen material. This will include the unique packaging configurations, contents modification for the cask license (via the Amendment process), criticality evaluations, and associated review and approval processes.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... test reactor, constructed to perform irradiation testing of fueled and unfueled experiments for space... constructed to test ``mock-up'' irradiation components for the Plum Brook Reactor. The reactors operated from...
Code of Federal Regulations, 2010 CFR
2010-01-01
... environmental impacts of renewing the operating license for a nuclear power plant as required by section 102(2... cooling ponds and is not expected to be a problem during the license renewal term. Aquatic Ecology (for... depression beyond the site boundary. Impacts of large ground-water withdrawal for cooling tower makeup at...
Wang, Xuanwen; Dong, Xiuwen Sue; Choi, Sang D; Dement, John
2017-05-01
Examine trends and patterns of work-related musculoskeletal disorders (WMSDs) among construction workers in the USA, with an emphasis on older workers. WMSDs were identified from the 1992-2014 Survey of Occupational Injuries and Illnesses (SOII), and employment was estimated from the Current Population Survey (CPS). Risk of WMSDs was measured by number of WMSDs per 10 000 full-time equivalent workers and stratified by major demographic and employment subgroups. Time series analysis was performed to examine the trend of WMSDs in construction. The number of WMSDs significantly dropped in the US construction industry, following the overall injury trends. However, the rate of WMSDs in construction remained higher than in all industries combined; the median days away from work increased from 8 days in 1992 to 13 days in 2014, and the proportion of WMSDs for construction workers aged 55 to 64 years almost doubled. By occupation, construction labourers had the largest number of WMSD cases, while helpers, heating and air-conditioning mechanics, cement masons and sheet metal workers had the highest rates of WMSDs. The major cause of WMSDs in construction was overexertion, and back injuries accounted for more than 40% of WMSDs among construction workers. The estimated wage loss for private wage-and-salary construction workers was $46 million in 2014. Construction workers continue to face a higher risk of WMSDs. Ergonomic solutions that reduce overexertion-the primary exposure for WMSDs-should be adopted extensively at construction sites, particularly for workers with a higher risk of WMSDs. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Strachan, C.L.; Raabe, K.L.
1997-12-31
In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less
47 CFR 90.767 - Construction and implementation of EA and Regional licenses.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations... all of their base stations or fixed stations. [69 FR 75172, Dec. 15, 2004] ... constructed stations. (d) EA and Regional licensees will not be permitted to count the resale of the services...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-04
...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...
47 CFR 1.2003 - Applications affected.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Wireless Telecommunications Bureau Application for Assignment of Authorization and Transfer of Control; FCC... for Consent to Transfer of Control of Corporation Holding Broadcast Station Construction Permit or... License or Transfer of Control of Corporation Holding Radio Broadcast Station Construction Permit or...
ERIC Educational Resources Information Center
Maloney, Betsy
2015-01-01
In this research study, I examined how institutional power affected the experiences of two dance educators attempting to gain their K-12 dance teaching license in Minnesota. My research analyzed the ways in which candidates applying for the portfolio review process constructed, amended, or abandoned their identities as teachers/artists/individuals…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Prospective Grant of Start..., is contemplating the grant of a start-up exclusive license to practice the inventions embodied in U.S... Cryoarray'' by Star et al. (NIDDK) to Micatu, Inc. having a place of business at 231 West Water Street...
A Post Licensing Study of Community Effects at Two Operating Nuclear Power Plants. Final Report.
ERIC Educational Resources Information Center
Purdy, Bruce J.; And Others
In an effort to identify and assess the social, economic, and political effects of nuclear power plant construction and operation upon two host communities (Plymouth, Massachusetts and Waterford, Connecticut), a post-licensing review revealed that the primary impact of the nuclear power plants in both communities was an increase in the property…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
.... (as shown in Attachment 1)) EA-12-049 I The Licensees and construction permits (CP) holders \\1..., ``Licenses, Certifications, and Approvals for Nuclear Power Plants.'' \\1\\ CP holders, as used in this Order... that additional requirements must be imposed on Licensees or CP holders to increase the [[Page 16092...
ERIC Educational Resources Information Center
Jorgensen, Louise B.
2012-01-01
The purpose of this dissertation study was to increase understanding of licensed mental health professionals' experiences as they have encountered and navigated through compassion fatigue (CF). CF is a complex construct with an attendant constellation of secondary stress responses. In order to examine the complex and varying factors…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... accidents are increased. Therefore, there is no undue risk to public health and safety. Plant construction... at this time. Based on the nature of the requested exemption as described above, no new accident... a license decision is made, the probability of postulated accidents is not increased. Additionally...
49 CFR 40.281 - Who is qualified to act as a SAP?
Code of Federal Regulations, 2011 CFR
2011-10-01
...); (2) You are a licensed or certified social worker; (3) You are a licensed or certified psychologist... New Jersey Avenue, SE., Washington DC, 20590 (202-366-3784), or on the ODAPC web site (http://www.dot...
49 CFR 40.281 - Who is qualified to act as a SAP?
Code of Federal Regulations, 2010 CFR
2010-10-01
...); (2) You are a licensed or certified social worker; (3) You are a licensed or certified psychologist... New Jersey Avenue, SE., Washington DC, 20590 (202-366-3784), or on the ODAPC web site (http://www.dot...
14 CFR 415.203 - Environmental information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental information. 415.203 Section..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH LICENSE Environmental Review § 415.203 Environmental information. An applicant shall submit environmental information concerning: (a) A proposed launch site not...
10 CFR 52.93 - Exemptions and variances.
Code of Federal Regulations, 2010 CFR
2010-01-01
... referencing a nuclear power reactor manufactured under a manufacturing license issued under subpart F of this... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS..., site parameters, terms and conditions, or approved design of the manufactured reactor. The Commission...
10 CFR 52.110 - Termination of license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS... final legally effective order to permanently cease operations has come into effect, the 10 CFR part 52... reasons for concluding that the environmental impacts associated with site-specific decommissioning...
Commercial Space Port Planning in Texas
NASA Astrophysics Data System (ADS)
Bell, L.; Looke, B.
2002-01-01
The Texas Legislature is providing funding to support research and planning activities aimed at creating a commercial spaceport in the state. These monies have been allocated to regional Spaceport Development Corporations that have been established in three countries containing candidate site locations: Willacy County (in South Texas); Brazoria County (East Texas); and Pecos County (West Texas). This program is being sponsored and coordinated by the Texas Aerospace Commission (TAC). The Sasakawa International Center for Space Architecture (SICSA) at the University of Houston is providing research, planning and design support to TAC and is a member of each of the three regional development teams. Planning must carefully consider special support requirements and operational characteristics of all prospective launch systems along with geographic, infrastructure and environmental factors at each site. Two of the candidate sites are in coastal areas; a priority for certain launch service providers; whereas the third inland site is more attractive to others. Candidate launch systems include winged horizontal takeoff air-launch vehicles, vertical multi-stage reusable launch vehicles, and expendable sub-orbital surrounding rockets. Important research and planning activities include environmental impact assessments, analyses of overflight hazards, investigations of economic impacts and business plan development. The results of these activities will guide master plan development for each site, including: a physical plan (site layout, infrastructure improvements and facility construction); and a strategic plan (user agreements, licenses, finance sources and participants). Commercial spaceport development demands compliance with stringent FAA regulations established by the Office of Commercial Space Transportation (OCST) which exceed minimum standards allowed for U.S. Government spaceport facilities. Key among these requirements are 15,000 ft. radius on-site clear zones separating launch areas form inhabited facilities, and extremely conservative flight risk restrictions associated with launch trajectories over populated areas. Unless modified, the flight risk criteria currently mandated will prevent virtually all new U.S. commercial spaceport operating license proposals from being approved. Commercial spaceport development also presents significant financing challenges. New launch service companies typically lack substantial economic resources needed for infrastructure construction such as long horizontal runways, launch platforms and vehicle assembly and payload integration facilities. Outside investment sources much be identified, with supplementary revenues potentially derived from space tourism and ancillary public service uses. Texas spaceport planning sponsors, participants and advocates recognize that such a development warrants the necessary investment. It will support the advancement and services of new generations of launch systems vitally needed to reduce the high costs of space access. It will afford new state-wide, regional and local economic development opportunities that promote business investments, create jobs and expand infrastructure resources. It will also support a wide spectrum of educational objectives by including and serving academic programs at all levels. Regardless which site is ultimately selected, all Texas regions and public interests in general will benefit.
14 CFR 420.51 - Responsibilities-general.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Responsibilities-general. 420.51 Section 420.51 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Responsibilities of a Licensee § 420...
14 CFR 420.51 - Responsibilities-general.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Responsibilities-general. 420.51 Section 420.51 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Responsibilities of a Licensee § 420...
Commercial space transportation licensing : Quarterly Launch Report : special report
DOT National Transportation Integrated Search
1999-01-01
In order to conduct a commercial space launch or operate a commercial launch site in the U.S., it is necessary to obtain a license from the United States government. Under the 1972 United Nations Convention on International Liability for Damage Cause...
Licensing of commercial launch sites : Quarterly Launch Report : special report :
DOT National Transportation Integrated Search
2000-01-01
The Commercial Space Launch Act of 1984 as recodified at 49 U.S.C. Subtitle IX--Commercial Space Transportation, ch. 701, Commercial Space Launch Activities, 49 U.S.C. '' 70101- authorizes the Secretary of Transportation to license launches or the op...
ADVANCED SEISMIC BASE ISOLATION METHODS FOR MODULAR REACTORS
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. Blanford; E. Keldrauk; M. Laufer
2010-09-20
Advanced technologies for structural design and construction have the potential for major impact not only on nuclear power plant construction time and cost, but also on the design process and on the safety, security and reliability of next generation of nuclear power plants. In future Generation IV (Gen IV) reactors, structural and seismic design should be much more closely integrated with the design of nuclear and industrial safety systems, physical security systems, and international safeguards systems. Overall reliability will be increased, through the use of replaceable and modular equipment, and through design to facilitate on-line monitoring, in-service inspection, maintenance, replacement,more » and decommissioning. Economics will also receive high design priority, through integrated engineering efforts to optimize building arrangements to minimize building heights and footprints. Finally, the licensing approach will be transformed by becoming increasingly performance based and technology neutral, using best-estimate simulation methods with uncertainty and margin quantification. In this context, two structural engineering technologies, seismic base isolation and modular steel-plate/concrete composite structural walls, are investigated. These technologies have major potential to (1) enable standardized reactor designs to be deployed across a wider range of sites, (2) reduce the impact of uncertainties related to site-specific seismic conditions, and (3) alleviate reactor equipment qualification requirements. For Gen IV reactors the potential for deliberate crashes of large aircraft must also be considered in design. This report concludes that base-isolated structures should be decoupled from the reactor external event exclusion system. As an example, a scoping analysis is performed for a rectangular, decoupled external event shell designed as a grillage. This report also reviews modular construction technology, particularly steel-plate/concrete construction using factory prefabricated structural modules, for application to external event shell and base isolated structures.« less
47 CFR 27.14 - Construction requirements; Criteria for renewal.
Code of Federal Regulations, 2013 CFR
2013-10-01
... at least 40 percent of the license area's population by March 13, 2017, and to at least 75 percent of... a license area by March 13, 2017, and 30 point-to-point links per million persons (one link per 33... minimum of 15 point-to-point links by March 13, 2017, and a minimum of 15 point-to-point links by...
47 CFR 27.14 - Construction requirements; Criteria for renewal.
Code of Federal Regulations, 2014 CFR
2014-10-01
...'s population by March 13, 2017, and to at least 75 percent of the license area's population by...-point links per million persons (one link per 67,000 persons) in a license area by March 13, 2017, and...-point links by March 13, 2017, and a minimum of 15 point-to-point links by September 13, 2019. (4) Under...
Code of Federal Regulations, 2014 CFR
2014-07-01
... determined by the Secretary charged with its administration. (m) The Ocean Thermal Energy Conversion Act of... of NOAA for the ownership, construction, location, and operation of ocean thermal energy conversion... Energy Regulatory Agency (FERC) to issue licenses for the construction and the operation and maintenance...
Code of Federal Regulations, 2011 CFR
2011-07-01
... § 192.32 Standards. (a) Standards for application during processing operations and prior to the end of... nonoperational and subject to a license by the Nuclear Regulatory Commission or an Agreement State shall limit... the Nuclear Regulatory Commission or Agreement State into individual site licenses. (ii) The Nuclear...
Code of Federal Regulations, 2010 CFR
2010-07-01
... § 192.32 Standards. (a) Standards for application during processing operations and prior to the end of... nonoperational and subject to a license by the Nuclear Regulatory Commission or an Agreement State shall limit... the Nuclear Regulatory Commission or Agreement State into individual site licenses. (ii) The Nuclear...
Helmer, K G; Chou, M-C; Preciado, R I; Gimi, B; Rollins, N K; Song, A; Turner, J; Mori, S
2016-02-27
It is now common for magnetic-resonance-imaging (MRI) based multi-site trials to include diffusion-weighted imaging (DWI) as part of the protocol. It is also common for these sites to possess MR scanners of different manufacturers, different software and hardware, and different software licenses. These differences mean that scanners may not be able to acquire data with the same number of gradient amplitude values and number of available gradient directions. Variability can also occur in achievable b-values and minimum echo times. The challenge of a multi-site study then, is to create a common protocol by understanding and then minimizing the effects of scanner variability and identifying reliable and accurate diffusion metrics. This study describes the effect of site, scanner vendor, field strength, and TE on two diffusion metrics: the first moment of the diffusion tensor field (mean diffusivity, MD), and the fractional anisotropy (FA) using two common analyses (region-of-interest and mean-bin value of whole brain histograms). The goal of the study was to identify sources of variability in diffusion-sensitized imaging and their influence on commonly reported metrics. The results demonstrate that the site, vendor, field strength, and echo time all contribute to variability in FA and MD, though to different extent. We conclude that characterization of the variability of DTI metrics due to site, vendor, field strength, and echo time is a worthwhile step in the construction of multi-center trials.
McCloskey, Rose; Donovan, Cindy; Stewart, Connie; Donovan, Alicia
2015-09-01
Calls for improved conditions in nursing homes have pointed to the importance of optimizing the levels and skills of care providers. Understanding the work of care providers will help to determine if staff are being used to their full potential and if opportunities exist for improved efficiencies. To explore the activities of care providers in different nursing homes and to identify if variations exist within and across homes and shifts. A multi-centre cross-sectional observational work flow study was conducted in seven different nursing homes sites in one Canadian province. Data were collected by a research assistant who conducted 368 h of observation. The research assistant collected data by following an identical route in each site and recording observations on staff activities. Findings indicate staff activities vary across roles, sites and shifts. Licensed practical nurses (nursing assistants) have the greatest variation in their role while registered nurses have the least amount of variability. In some sites both registered nurses and licensed practical nurses perform activities that may be safely delegated to others. Care providers spend as much as 53.7% of their time engaged in non-value added activities. There may be opportunities for registered nurses and licensed practical nurses to delegate some of their activities to non-regulated workers. The time care providers spend in non-value activities suggest there may be opportunities to improve efficiencies within the nursing home setting. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Nicholson, T. J.; Raione, R.; Ahn, H.; Barnhurst, D.; Giacinto, J.; McBride, M.; Tiruneh, N. D.
2009-12-01
The NRC regulates the civilian use of radioactive materials and facilities in an open and transparent manner. The NRC regulatory criteria are designed to protect human health and safety, and the environment by regulating nuclear facilities. During review of new reactor licensing applications, NRC staff reviews and independently verifies hydrogeologic information submitted by the applicant in several topical areas such as development and testing of Conceptual Site Models (CSM) which may involve perched aquifers; engineered water level fluctuations of surface-water reservoirs; ground-water collector wells and local ground-water uses; design-basis ground-water levels for structural analysis; analysis of scenarios for potential release of radionuclides to the subsurface; deep well injection of effluents; and monitoring to detect radionuclide releases. This information is reviewed in a systematic manner in accordance with NRC requirements and guidance to evaluate safety and environmental impacts and reduce the uncertainties for these impacts. NRC licensing staff is reviewing 14 applications for siting new reactors. Experience gained through these licensing activities has shown the value of using site-specific data to evaluate the CSM and its use to assess design and operational issues. Optimizing the information flow process through a systemically and thorough review process creates efficiencies. Through an iterative process of evaluating various geographical settings and associated ground-water conditions, NRC staff has developed methods to minimize prediction uncertainty through the use of confirmatory analyses performed under conservative, hierarchal approaches.
14 CFR 420.53 - Control of public access.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Control of public access. 420.53 Section 420.53 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Responsibilities of a Licensee § 420...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Environmental. 433.7 Section 433.7... TRANSPORTATION LICENSING LICENSE TO OPERATE A REENTRY SITE § 433.7 Environmental. An applicant shall provide the FAA with information for the FAA to analyze the environmental impacts associated with proposed...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Agreements. 431.75 Section 431.75...-Reusable Launch Vehicle Mission License Terms and Conditions § 431.75 Agreements. (a) Launch and reentry site use agreements. Before conducting a licensed RLV mission using property and services of a Federal...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Agreements. 431.75 Section 431.75...-Reusable Launch Vehicle Mission License Terms and Conditions § 431.75 Agreements. (a) Launch and reentry site use agreements. Before conducting a licensed RLV mission using property and services of a Federal...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Agreements. 431.75 Section 431.75...-Reusable Launch Vehicle Mission License Terms and Conditions § 431.75 Agreements. (a) Launch and reentry site use agreements. Before conducting a licensed RLV mission using property and services of a Federal...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Agreements. 431.75 Section 431.75...-Reusable Launch Vehicle Mission License Terms and Conditions § 431.75 Agreements. (a) Launch and reentry site use agreements. Before conducting a licensed RLV mission using property and services of a Federal...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Agreements. 431.75 Section 431.75...-Reusable Launch Vehicle Mission License Terms and Conditions § 431.75 Agreements. (a) Launch and reentry site use agreements. Before conducting a licensed RLV mission using property and services of a Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0231] Applications and Amendments to Facility Operating... Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive... describes a different method for submitting comments on a specific subject): Federal Rulemaking Web site: Go...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
..., alpha plus beta measurements, smear sampling, and soil sampling activities. As a result of the...-Agency Radiation Survey and Site Investigation Manual.'' The U of AZ submitted a revised FSS Plan on... and that the [[Page 13377
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 50.10 - License required; limited work authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the land for public recreational purposes; (ii) Site exploration, including necessary borings to... building with space for installation of a training reactor). (b) Requirement for license. Except as... applicant and, except as to the matters determined under paragraph (e)(1) of this section, the issuance of...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
10 CFR 61.28 - Contents of application for closure.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Licenses § 61.28 Contents of application for closure. (a) Prior to final closure of the disposal... site data pertinent to the long-term containment of emplaced radioactive wastes obtained during the...
Why open drug discovery needs four simple rules for licensing data and models.
Williams, Antony J; Wilbanks, John; Ekins, Sean
2012-01-01
When we look at the rapid growth of scientific databases on the Internet in the past decade, we tend to take the accessibility and provenance of the data for granted. As we see a future of increased database integration, the licensing of the data may be a hurdle that hampers progress and usability. We have formulated four rules for licensing data for open drug discovery, which we propose as a starting point for consideration by databases and for their ultimate adoption. This work could also be extended to the computational models derived from such data. We suggest that scientists in the future will need to consider data licensing before they embark upon re-using such content in databases they construct themselves.
10 CFR 52.28 - Transfer of early site permit.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Transfer of early site permit. 52.28 Section 52.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.28 Transfer of early site permit. An application to transfer an early site...
10 CFR 52.28 - Transfer of early site permit.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Transfer of early site permit. 52.28 Section 52.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.28 Transfer of early site permit. An application to transfer an early site...
14 CFR 420.6-420.14 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false [Reserved] 420.6-420.14 Section 420.6-420.14 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE General §§ 420.6-420.14 [Reserved] ...
14 CFR 420.6-420.14 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false [Reserved] 420.6-420.14 Section 420.6-420.14 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE General §§ 420.6-420.14 [Reserved] ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-07
...., Metropolis Works; License Amendment Request and Request for a Hearing AGENCY: Nuclear Regulatory Commission... surface impoundment decommissioning plan at its Metropolis Works Facility site located in Metropolis... information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0272] Applications and Amendments to Facility Operating... Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive... submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www.regulations.gov and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-11
... Operating Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non... document. You may submit comments by any one of the following methods: Federal Rulemaking Web Site: Go to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... emergency operating procedures (EOP), and site survey monitoring that support modification of emergency plan... Power Company; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed... Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License...
10 CFR 73.50 - Requirements for physical protection of licensed activities.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Requirements for physical protection of licensed activities. 73.50 Section 73.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.50 Requirements for physical...
10 CFR 73.50 - Requirements for physical protection of licensed activities.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Requirements for physical protection of licensed activities. 73.50 Section 73.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PHYSICAL PROTECTION OF PLANTS AND MATERIALS Physical Protection Requirements at Fixed Sites § 73.50 Requirements for physical...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Records. 420.61 Section 420.61 Aeronautics... TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Responsibilities of a Licensee § 420.61 Records. (a) A licensee shall maintain all records, data, and other material needed to verify that its operations are...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Records. 420.61 Section 420.61 Aeronautics... TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Responsibilities of a Licensee § 420.61 Records. (a) A licensee shall maintain all records, data, and other material needed to verify that its operations are...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Records. 420.61 Section 420.61 Aeronautics... TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Responsibilities of a Licensee § 420.61 Records. (a) A licensee shall maintain all records, data, and other material needed to verify that its operations are...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
47 CFR 25.271 - Control of transmitting stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... station. (b) The licensee of a transmitting earth station licensed under this part shall ensure that a trained operator is present on the earth station site, or at a designated remote control point for the earth station, at all times that transmissions are being conducted. No operator's license is required...
75 FR 54145 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, NV, Comment Period Ends..., GENERIC--License Renewal of Nuclear Plants for Kewaunee Power Station, Supplement 40 to NUREG-1437... EIS, NRC, GA, Vogtle Electric Generating Plant Units 3 and 4, Construction and Operation, Application...
46 CFR 380.24 - Schedule of retention periods and description of records.
Code of Federal Regulations, 2010 CFR
2010-10-01
... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...
46 CFR 380.24 - Schedule of retention periods and description of records.
Code of Federal Regulations, 2014 CFR
2014-10-01
... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...
46 CFR 380.24 - Schedule of retention periods and description of records.
Code of Federal Regulations, 2012 CFR
2012-10-01
... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...
46 CFR 380.24 - Schedule of retention periods and description of records.
Code of Federal Regulations, 2011 CFR
2011-10-01
... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...
46 CFR 380.24 - Schedule of retention periods and description of records.
Code of Federal Regulations, 2013 CFR
2013-10-01
... bonds, salvage data, and claim files; (4) Contracts, agreements, franchises, licenses, etc., such as subsidy, charter, ship construction, and pooling agreements; (5) Vessel operating records such as log... Administration: (1) Ship construction or reconversion records such as bids, plans, progress payments, and...
Environmental review of Potomac Electric Power Company's proposed Station H Element I
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-04-01
The report has been conducted to evaluate the potential impacts to environmental and cultural resources from the proposed construction and operation of Element I (the combustion turbine portion) of the Station H power plant facility at Potomac Electric Power Company's Dickerson site. This review also presents an evaluation of air quality impacts of Elements I and II (combustion turbine and combined cycle components of the facility) and an assessment of compliance with state and Federal air quality regulations (primarily the ambient air quality standards and the air quality impact requirements of PSD regulations). Results of the Environmental Review analysis aremore » used as the basis for establishing preliminary recommended licensing conditions for operating the proposed facility. These recommendations are also included in the report.« less
Memorandum of Understanding Between U.S. EPA Superfund and U.S. NRC
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walker, Stuart
2008-01-15
The Environmental Protection Agency (EPA) Office of Superfund Remediation and Technology Innovation (OSRTI) and the Nuclear Regulatory Commission (NRC) are responsible for implementing the 'Memorandum of Understanding Between the Environmental Protection Agency and the Nuclear Regulatory Commission: Consultation and Finality on Decommissioning and Decontamination of Contaminated Sites'. This paper provides a brief overview of the origin of the Memorandum of Understanding (MOU), the major features of the MOU, and how the MOU has been implemented site specifically. EPA and NRC developed the MOU in response to direction from the House Committee on Appropriations to EPA and NRC to work togethermore » to address the potential for dual regulation. The MOU was signed by EPA on September 30, 2002 and NRC on October 9, 2002. The two agencies had worked on the MOU since March 2000. While both EPA and NRC have statutory authority to clean up these sites, the MOU provides consultation procedures between EPA and NRC to eliminate dual regulation. Under the MOU, EPA and NRC identified the interactions of the two agencies for the decommissioning and decontamination of NRC-licensed sites and the ways in which those responsibilities will be exercised. Except for Section VI, which addresses corrective action under the Resource Conservation and Recovery Act (RCRA), this MOU is limited to the coordination between EPA, when acting under its CERCLA authority, and NRC, when a facility licensed by the NRC is undergoing decommissioning, or when a facility has completed decommissioning, and the NRC has terminated its license. EPA believes that implementation of the MOU between the two agencies will ensure that future confusion about dual regulation does not occur regarding the cleanup and reuse of NRC-licensed sites. NRC and EPA have so far exchanged MOU consultation letters on eight NRC-licensed sites. EPA has responded to each consultation request with a letter expressing its views on actions that NRC should consider that address the site-specific matter that triggered consultation. Over the course of consultations on the eight sites, there have been some reoccurring themes to EPA's views. Primarily, these are EPA: 1. Recommending that NRC consider selecting institutional controls to ensure that NRC's assumptions about future human exposure at the site are not exceeded. 2. Recommending that NRC consider using more site-specific information when conducting dose assessment modeling. 3. Recommending that NRC consider a flexible approach to groundwater protection that still ensures the public is not exposed to contamination levels over drinking water limits. 4. Recommending that NRC consider an approach similar to how EPA implements supplemental standards under 40 CFR 192 as an ARAR when the UMTRCA soil standard of 5 pCi/g is not being met.« less
Code of Federal Regulations, 2013 CFR
2013-01-01
... include: (A) Changes for temporary use of the land for public recreational purposes; (B) Site exploration... building with space for installation of a training reactor). (2) For materials licenses, taking any site...
Code of Federal Regulations, 2014 CFR
2014-01-01
... include: (A) Changes for temporary use of the land for public recreational purposes; (B) Site exploration... building with space for installation of a training reactor). (2) For materials licenses, taking any site...
Code of Federal Regulations, 2012 CFR
2012-01-01
... include: (A) Changes for temporary use of the land for public recreational purposes; (B) Site exploration... building with space for installation of a training reactor). (2) For materials licenses, taking any site...
47 CFR 90.725 - Construction requirements for Phase I licensees.
Code of Federal Regulations, 2010 CFR
2010-10-01
... granted commercial nationwide authorizations will be required to construct base stations and placed those base stations in operation as follows: (1) In at least 10 percent of the geographic areas designated in the application within two years of initial license grant, including base stations in at least seven...
Omitted Arguments and Complexity of Predication
ERIC Educational Resources Information Center
Port, Martin
2010-01-01
This work focuses on the licensing conditions and logical structure of understood-argument constructions, or complement-drop constructions, in English. There are two main types of such arguments: Indefinite Understood Arguments (IUA) and Definite Understood Arguments (DUA). IUA readings occur in such cases in "He ate, He cooked". In such cases,…
47 CFR 101.527 - Construction requirements for 24 GHz operations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...
47 CFR 101.527 - Construction requirements for 24 GHz operations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...
47 CFR 101.527 - Construction requirements for 24 GHz operations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...
47 CFR 101.527 - Construction requirements for 24 GHz operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...
47 CFR 101.527 - Construction requirements for 24 GHz operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... it. (d) The frequencies associated with incumbent authorizations, licensed on a SMSA basis, that have... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.527 Construction requirements for 24 GHz operations. (a) Each licensee must make a showing of...
10 CFR 2.400 - Scope of subpart.
Code of Federal Regulations, 2010 CFR
2010-01-01
... to construct and/or operate nuclear power reactors of identical design to be located at multiple... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... 10 Energy 1 2010-01-01 2010-01-01 false Scope of subpart. 2.400 Section 2.400 Energy NUCLEAR...
47 CFR 22.143 - Construction prior to grant of application.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES PUBLIC MOBILE SERVICES Licensing Requirements and Procedures Applications and Notifications § 22... Mobile services prior to grant of their applications, subject to the provisions of this section, but must... 47 Telecommunication 2 2010-10-01 2010-10-01 false Construction prior to grant of application. 22...
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2011 CFR
2011-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2012 CFR
2012-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
10 CFR 52.99 - Inspection during construction.
Code of Federal Regulations, 2010 CFR
2010-01-01
... license may proceed at its own risk with design and procurement activities, and a licensee may proceed at its own risk with design, procurement, construction, and pre-operational activities, even though the... 10 CFR 50.10(a), whichever is later, its schedule for completing the inspections, tests, or analyses...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2011 CFR
2011-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
18 CFR 11.6 - Exemption of State and municipal licensees and exemptees.
Code of Federal Regulations, 2012 CFR
2012-04-01
.... (a) Bases for exemption. A State or municipal licensee or exemptee may claim total or partial... State or municipal purposes, such as lighting streets, highways, parks, public buildings, etc., for... profit. (g) Construction period. During the period when the licensed project is under construction and is...
10 CFR 60.18 - Review of site characterization activities. 2
Code of Federal Regulations, 2010 CFR
2010-01-01
... IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.18 Review of site characterization... its progress in developing the design of a geologic repository operations area appropriate for the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less
Why Open Drug Discovery Needs Four Simple Rules for Licensing Data and Models
Williams, Antony J.; Wilbanks, John; Ekins, Sean
2012-01-01
When we look at the rapid growth of scientific databases on the Internet in the past decade, we tend to take the accessibility and provenance of the data for granted. As we see a future of increased database integration, the licensing of the data may be a hurdle that hampers progress and usability. We have formulated four rules for licensing data for open drug discovery, which we propose as a starting point for consideration by databases and for their ultimate adoption. This work could also be extended to the computational models derived from such data. We suggest that scientists in the future will need to consider data licensing before they embark upon re-using such content in databases they construct themselves. PMID:23028298
10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.
Code of Federal Regulations, 2013 CFR
2013-01-01
... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...
10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...
10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.
Code of Federal Regulations, 2014 CFR
2014-01-01
... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...
10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.
Code of Federal Regulations, 2012 CFR
2012-01-01
... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...
10 CFR 51.106 - Public hearings in proceedings for issuance of operating licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... concerning need for power or alternative energy sources or alternative sites for the facility for which an... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of operating licenses. 51.106 Section 51.106 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-22
... Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information for Contention... related to the license renewal application using any of the following methods: Federal Rulemaking Web site..., select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems with...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-348 AND 50-364; NRC-2012-0053] Facility Operating License Amendment From Southern Nuclear Operating, Inc., Joseph M. Farley Nuclear Plant, Units 1 and 2...-0053. You may submit comments by the following methods: Federal Rulemaking Web site: Go to http://www...
UCC2B: The Impact on Information Professionals.
ERIC Educational Resources Information Center
Ebbinghouse, Carol
1998-01-01
Discusses the impact of the Uniform Commercial Code (UCC) Article 2B, dealing with licenses of information and software contracts, on information professionals. Mass market licenses, copyrights, standard form contracts, and impact on first sale are examined. A sidebar lists key World Wide Web sites and includes a sample letter of concern. (LRW)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... State-licensed uranium recovery site, either conventional, heap leach, or in situ recovery. DATES... types of new uranium recovery facilities (conventional mills, heap leach facilities, and in situ... from the ground for processing at a mill. Rather, the ore is processed in-situ with the resulting...
Beall, Reed F; Kuhn, Randall; Attaran, Amir
2015-03-01
Compulsory licensing has been widely suggested as a legal mechanism for bypassing patents to introduce lower-cost generic antiretrovirals for HIV/AIDS in developing countries. Previous studies found that compulsory licensing can reduce procurement prices for drugs, but it is unknown how the resulting prices compare to procurements through the Global Fund to Fight AIDS, Tuberculosis, and Malaria; UNICEF; and other international channels. For this study we systematically constructed a case-study database of compulsory licensing activity for antiretrovirals and compared compulsory license prices to those in the World Health Organization's (WHO's) Global Price Reporting Mechanism and the Global Fund's Price and Quality Reporting Tool. Thirty compulsory license cases were analyzed with 673 comparable procurements from WHO and Global Fund data. Compulsory license prices exceeded the median international procurement prices in nineteen of the thirty case studies, often with a price gap of more than 25 percent. Compulsory licensing often delivered suboptimal value when compared to the alternative of international procurement, especially when used by low-income countries to manufacture medicines locally. There is an ongoing need for multilateral and charitable actors to work collectively with governments and medicine suppliers on policy options. Project HOPE—The People-to-People Health Foundation, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Andersson, J.
1993-12-31
The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reasonmore » for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments.« less
Hofmann, Bjørn
2017-02-25
In an interesting article Wieteke van Dijk and colleagues argue that societal developments and values influence the practice of medicine, and thus can result in both medicalisation and overdiagnosis. They provide a convincing argument that overdiagnosis emerges in a social context and that it has socially constructed implications. However, they fail to show that overdiagnosis per se is socially constructed and how this construction occurs. Moreover, the authors discuss overdiagnosis on a micro level without acknowledging that overdiagnosis cannot be observed in individuals "in the doctor's office." We cannot tell whether a diagnosed person is overdiagnosed or not. This is the core of the problem. Despite these shortcomings, Wieteke van Dijk and her colleagues are certainly on to something important, and they should be encouraged to elaborate their perspective. We certainly need to deepen our understanding of the social construction of overdiagnosis. © 2017 The Author(s); Published by Kerman University of Medical Sciences. This is an open-access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Wilson, Mandy L; Okumoto, Sakiko; Adam, Laura; Peccoud, Jean
2014-01-15
Expression vectors used in different biotechnology applications are designed with domain-specific rules. For instance, promoters, origins of replication or homologous recombination sites are host-specific. Similarly, chromosomal integration or viral delivery of an expression cassette imposes specific structural constraints. As de novo gene synthesis and synthetic biology methods permeate many biotechnology specialties, the design of application-specific expression vectors becomes the new norm. In this context, it is desirable to formalize vector design strategies applicable in different domains. Using the design of constructs to express genes in the chloroplast of Chlamydomonas reinhardtii as an example, we show that a vector design strategy can be formalized as a domain-specific language. We have developed a graphical editor of context-free grammars usable by biologists without prior exposure to language theory. This environment makes it possible for biologists to iteratively improve their design strategies throughout the course of a project. It is also possible to ensure that vectors designed with early iterations of the language are consistent with the latest iteration of the language. The context-free grammar editor is part of the GenoCAD application. A public instance of GenoCAD is available at http://www.genocad.org. GenoCAD source code is available from SourceForge and licensed under the Apache v2.0 open source license.
10 CFR 50.33 - Contents of applications; general information.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (e) The class of license applied for, the use to which the facility will be put, the period of time... applicable, the following should be provided: (1) If the application is for a construction permit, the... assurance of obtaining the funds necessary to cover estimated construction costs and related fuel cycle...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0249] Solicitation of Feedback and Lessons-Learned from... or the Commission) is soliciting feedback and lessons-learned from members of the public, licensees... constructed in accordance with the licensing basis. The NRC has applied lessons- learned from the prior plants...
47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...
47 CFR 73.1692 - Broadcast station construction near or installation on an AM broadcast tower.
Code of Federal Regulations, 2010 CFR
2010-10-01
... the indirect method (see § 73.51). Upon the completion of the installation, antenna impedance... completion of construction, antenna impedance measurements of the AM station shall be made. In addition... simultaneously with the filing of the application for license to cover this permit, the results of the impedance...
River flow maintenance turbine for Milner Hydroelectric Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carson, J.L.; Holveck, W.H.; Gokhman, A.
1995-12-31
The Milner Hydroelectric Project on the Snake River in Idaho was commissioned in 1992. The project included renovation of an existing dam, which was built to supply irrigation water to a canal system, construction of a new spillway, and the addition of a new powerhouse. The forebay of the main powerhouse is located on a combination power and irrigation canal, approximately 3500 feet (1070 m) from the dam, with a short tailrace returning the water to the river. There are two Kaplan turbines installed in the main powerhouse, rated at 1000 cfs and 4000 cfs respectively at a net headmore » of 150 feet. The FERC license required that a target flow of 200 cfs be released from the dam to maintain a stream flow between the dam and the powerhouse. In order to utilize this flow, a small powerhouse was constructed at the toe of the dam. The site conditions favored a vertical axial flow turbine, with a net head of 56 feet. As the flow is constant and the head is fairly constant, a fixed geometry turbine was selected, to be controlled solely by the intake gate. Due to the higher head, the main powerhouse can generate more power per unit of flow than can the bypass turbine. Therefore, it is undesirable for the discharge of the bypass turbine to be any greater than required by the license. Also, the release flow is determined by a river gauge, the accuracy of which is unknown, but assumed to be within five percent. In order to meet these two requirements, the turbine was specified to have manually adjustable runner blades to obtain the required release flow of 200 cfs at any head between 55 and 58 feet.« less
47 CFR 73.635 - Use of common antenna site.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Use of common antenna site. 73.635 Section 73.635 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Television Broadcast Stations § 73.635 Use of common antenna site. No television license...
47 CFR 73.635 - Use of common antenna site.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Use of common antenna site. 73.635 Section 73.635 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Television Broadcast Stations § 73.635 Use of common antenna site. No television license...
47 CFR 73.635 - Use of common antenna site.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Use of common antenna site. 73.635 Section 73.635 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Television Broadcast Stations § 73.635 Use of common antenna site. No television license...
47 CFR 73.635 - Use of common antenna site.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Use of common antenna site. 73.635 Section 73.635 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Television Broadcast Stations § 73.635 Use of common antenna site. No television license...
47 CFR 73.635 - Use of common antenna site.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Use of common antenna site. 73.635 Section 73.635 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Television Broadcast Stations § 73.635 Use of common antenna site. No television license...
10 CFR 60.16 - Site characterization plan required.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Site characterization plan required. 60.16 Section 60.16 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Licenses Preapplication Review § 60.16 Site characterization plan required. Before proceeding to...
Dual control by Cdk1 phosphorylation of the budding yeast APC/C ubiquitin ligase activator Cdh1.
Höckner, Sebastian; Neumann-Arnold, Lea; Seufert, Wolfgang
2016-07-15
The antagonism between cyclin-dependent kinases (Cdks) and the ubiquitin ligase APC/C-Cdh1 is central to eukaryotic cell cycle control. APC/C-Cdh1 targets cyclin B and other regulatory proteins for degradation, whereas Cdks disable APC/C-Cdh1 through phosphorylation of the Cdh1 activator protein at multiple sites. Budding yeast Cdh1 carries nine Cdk phosphorylation sites in its N-terminal regulatory domain, most or all of which contribute to inhibition. However, the precise role of individual sites has remained unclear. Here, we report that the Cdk phosphorylation sites of yeast Cdh1 are organized into autonomous subgroups and act through separate mechanisms. Cdk sites 1-3 had no direct effect on the APC/C binding of Cdh1 but inactivated a bipartite nuclear localization sequence (NLS) and thereby controlled the partitioning of Cdh1 between cytoplasm and nucleus. In contrast, Cdk sites 4-9 did not influence the cell cycle-regulated localization of Cdh1 but prevented its binding to the APC/C. Cdk sites 4-9 reside near two recently identified APC/C interaction motifs in a pattern conserved with the human Cdh1 orthologue. Thus a Cdk-inhibited NLS goes along with Cdk-inhibited APC/C binding sites in yeast Cdh1 to relay the negative control by Cdk1 phosphorylation of the ubiquitin ligase APC/C-Cdh1. © 2016 Höckner et al. This article is distributed by The American Society for Cell Biology under license from the author(s). Two months after publication it is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).
Leasing of Nuclear Power Plants With Using Floating Technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuznetsov, Yu.N.; Gabaraev, B.A.; Reshetov, V.A.
2002-07-01
The proposal to organize and realize the international program on leasing of Nuclear Power Plant (NPP) reactor compartments is brought to the notice of potential partners. The proposal is oriented to the construction of new NPPs or to replacement of worked-out reactor units of the NPPs in operation on the sites situated near water area and to the use of afloat technologies for construction, mounting and transportation of reactor units as a Reactor Compartment Block Module (RCBM). According to the offered project the RCBM is fabricated in factory conditions at the largest Russian defense shipbuilding plant - State Unitary Enterprisemore » 'Industrial Association SEVMASHPREDPRIYATIE' (SEVMASH) in the city of Severodvinsk of the Arkhangelsk region. After completion of assembling, testing and preliminary licensing the RCBM is given buoyancy by means of hermetic sealing and using pontoons and barges. The RCBM delivery to the NPP site situated near water area is performed by sea route. The RCBM is brought to the place of its installation with the use of appropriate hydraulic structures (canals, shipping locks), then is lowered on the basement constructed beforehand and incorporated into NPP scheme, of which the components are installed in advance. Floating means can be detached from the RCBM and used repeatedly for other RCBMs. Further procedure of NPP commissioning and its operation is carried out according to traditional method by power company in the framework of RCBM leasing with enlisting the services of firm-manufacturer's specialists either to provide reactor plant operation and concomitant processes or to perform author's supervision of operation. After completion of lifetime and reactor unloading the RCBM is dismantled with using the same afloat technology and taken away from NPP site to sea area entirely, together with its structures (reactor vessel, heat exchangers, pumps, pipelines and other equipment). Then RCBM is transported by shipping route to a firm-manufacturer, for subsequent reprocessing, utilization and storage. Nuclear fuel and radioactive wastes are removed from NPP site also. Use of leasing method removes legal problems connected with the transportation of radioactive materials through state borders as the RCBM remains a property of the state-producer at all stages of its life cycle. (authors)« less
78 FR 76319 - Notice of Invitation-Coal Exploration License Application MTM 106757, Montana
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-17
...] Notice of Invitation--Coal Exploration License Application MTM 106757, Montana AGENCY: Bureau of Land... Signal Peak Energy, LLC on a pro rata cost sharing basis in a program for the exploration of coal... Office coal Web site at http://www.blm.gov/mt/st/en/prog/energy/coal.html . A written notice to...
Code of Federal Regulations, 2010 CFR
2010-01-01
... increase potential health and safety impacts to workers or to the public, such as in any of the following... provided by Commission Order. (c) Each specific license continues in effect, beyond the expiration date if... licensee shall maintain in effect all decommissioning financial assurances established by the licensee...
ERIC Educational Resources Information Center
Fishel, Fred; Ferrell, Jason; Vallad, Gary; Price, Jim; Cherry, Ron; Mizell, Russ; Duncan, Larry
2010-01-01
Polycom technology has potential for efficient use of program delivery by Extension educators. A survey of licensed pesticide applicators attending a 1-day event at one of 20 host polycom sites revealed that polycom distance learning is effective for presenting information and learning. Responses also indicated that most of this audience is…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... and walk participants through all phases of the licensing and exemption processes using the Web site. Specifically, the webinar will provide the opportunity for participants to learn about the small hydropower licensing process, find out how to get more information and assistance from FERC, and ask questions. To...
Natural analog studies: Licensing perspective
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradbury, J.W.
1995-09-01
This report describes the licensing perspective of the term {open_quotes}natural analog studies{close_quotes} as used in CFR Part 60. It describes the misunderstandings related to its definition which has become evident during discussions at the U.S Nuclear Regulatory Commission meetings and tries to clarify the appropriate applications of natural analog studies to aspects of repository site characterization.
ERIC Educational Resources Information Center
Schiffman, Harold F.; Weiner, Richard E.
2012-01-01
Until recently, educational language policy in the US has been the chief site of contention about language, as seen in recent initiatives, referenda, and state constitutional amendments. Provision for drivers' licensing testing in languages other than English (LotE), on the other hand, has often exemplified what we call expedient language policy,…
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Conduct a radiation survey of the premises where the licensed activities were carried out and submit a... becquerels (picocuries) per gram for solids such as soils or concrete; and (ii) Specify the survey instrument... this section; or (2) The licensee has decided to permanently cease principal activities, as defined in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-28
... authorizes the operation of CBR's existing in situ uranium recovery (ISR) facility near Crawford, Nebraska... operate a satellite ISR facility, the Marsland Expansion Area (MEA) site, which is located in Dawes County, Nebraska, some eleven miles to the southeast of CBR's Crawford central processing facility. In response to...
Code of Federal Regulations, 2012 CFR
2012-01-01
... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as appropriate, shall determine whether the... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF...
Code of Federal Regulations, 2011 CFR
2011-01-01
... complete and acceptable for docketing under § 2.101(a)(3), the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor Regulation, as appropriate, shall determine whether the... a combined license proceeding. 2.629 Section 2.629 Energy NUCLEAR REGULATORY COMMISSION RULES OF...
FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burger, Chris; Wortman, David; Brown, Chris
The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less
Future U.S. supply of Mo-99 production through fission based LEU/LEU technology.
Welsh, James; Bigles, Carmen I; Valderrabano, Alejandro
Coquí RadioPharmaceuticals Corp. (Coquí) has the goal of establishing a medical isotope production facility for securing a continuous domestic supply of the radioisotope molybdenum-99 for U.S. citizens. Coquí will use an LEU/LEU proven and implemented open pool, light-water, 10 MW, reactor design. The facility is being designed with twin reactors for reliability an on-site hot lab chemical processing and a waste conditioning area and a possible generator producing radio-chemistry lab. Coquí identified a 25 acre site adjacent to an existing industrial park in northern central Florida. This land was gifted and transferred to Coquí by the University of Florida Foundation. We are in the process of developing licensing documents related to the facility. The construction permit application for submission to the U.S. Nuclear Regulatory Commission is currently being prepared. Submission is scheduled for mid to late 2015. Community reaction to the proposed development has been positive. We expect to create 220 permanent jobs and we have an anticipated to be operational by 2020.
43 CFR 11.24 - Preassessment screen-information on the site.
Code of Federal Regulations, 2011 CFR
2011-10-01
... to grant the permit or license authorizes such commitment of natural resources, and that the facility... site. 11.24 Section 11.24 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE ASSESSMENTS Preassessment Phase § 11.24 Preassessment screen—information on the site. (a...
43 CFR 11.24 - Preassessment screen-information on the site.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to grant the permit or license authorizes such commitment of natural resources, and that the facility... site. 11.24 Section 11.24 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE DAMAGE ASSESSMENTS Preassessment Phase § 11.24 Preassessment screen—information on the site. (a...
10 CFR 63.16 - Review of site characterization activities. 2
Code of Federal Regulations, 2012 CFR
2012-01-01
... which such activities are carried out and to observe excavations, borings, and in situ tests, as they... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Preapplication Review § 63.16 Review of site characterization activities. 2 2 In addition to the review of site characterization activities...
10 CFR 63.16 - Review of site characterization activities. 2
Code of Federal Regulations, 2011 CFR
2011-01-01
... which such activities are carried out and to observe excavations, borings, and in situ tests, as they... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Preapplication Review § 63.16 Review of site characterization activities. 2 2 In addition to the review of site characterization activities...
10 CFR 63.16 - Review of site characterization activities. 2
Code of Federal Regulations, 2013 CFR
2013-01-01
... which such activities are carried out and to observe excavations, borings, and in situ tests, as they... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Preapplication Review § 63.16 Review of site characterization activities. 2 2 In addition to the review of site characterization activities...
10 CFR 63.16 - Review of site characterization activities. 2
Code of Federal Regulations, 2010 CFR
2010-01-01
... which such activities are carried out and to observe excavations, borings, and in situ tests, as they... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Preapplication Review § 63.16 Review of site characterization activities. 2 2 In addition to the review of site characterization activities...
10 CFR 63.16 - Review of site characterization activities. 2
Code of Federal Regulations, 2014 CFR
2014-01-01
... which such activities are carried out and to observe excavations, borings, and in situ tests, as they... IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA Licenses Preapplication Review § 63.16 Review of site characterization activities. 2 2 In addition to the review of site characterization activities...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.50 - Disposal site suitability requirements for land disposal.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Disposal site suitability requirements for land disposal. 61.50 Section 61.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.50 Disposal site...
10 CFR 61.51 - Disposal site design for land disposal.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Disposal site design for land disposal. 61.51 Section 61.51 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Technical Requirements for Land Disposal Facilities § 61.51 Disposal site design for land...
76 FR 29240 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
...-283-7681. EIS No. 20110150, Final EIS, DOE, ID, ADOPTION--Areva Eagle Rock Enrichment Facility... Uranium Enrichment Facility, Construction, Operation, and Decommission, License Issuance, Piketon, OH...
Special Inspector General for Iraq Reconstruction Quarterly Report to the United States Congress
2012-04-30
Ministry of Provincial Aff airs sponsored a two-day decentralization conference for all non-KRG Provincial Councils and gover - nors to clarify...agriculture, tourism , health, education, housing and light construction, water resources, electricity, oil and gas, and transporta- tion. Th e assessment...2008−2011 Sector Number of Licenses Value of Licenses $ Millions Housing 155 16,250 Industry 136 6,392 Tourism 192 4,416 Trade 146 1,596 Agriculture 62
Code of Federal Regulations, 2010 CFR
2010-01-01
... increase potential health and safety impacts to workers or to the public, such as in any of the following... completed as soon as practicable and that the health and safety of workers and the public will be adequately... provided by Commission Order. (c) Each specific license continues in effect, beyond the expiration date if...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
... on the Commission's web site at http://www.ferc.gov/docs-filing/efiling.asp . If unable to be filed... http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at... account for differences in net head resulting from operations under the new license for the project. l...
30 CFR 585.618 - What must I do upon completion of approved site assessment activities?
Code of Federal Regulations, 2014 CFR
2014-07-01
... assessment term, you timely submit a COP meeting the requirements of this subpart, or a complete FERC license... facilities in place on your lease during the time that BOEM reviews your COP for approval or FERC reviews... for facilities that are authorized to remain in place under your approved COP or approved FERC license...
30 CFR 585.618 - What must I do upon completion of approved site assessment activities?
Code of Federal Regulations, 2012 CFR
2012-07-01
... assessment term, you timely submit a COP meeting the requirements of this subpart, or a complete FERC license... facilities in place on your lease during the time that BOEM reviews your COP for approval or FERC reviews... for facilities that are authorized to remain in place under your approved COP or approved FERC license...
30 CFR 585.618 - What must I do upon completion of approved site assessment activities?
Code of Federal Regulations, 2013 CFR
2013-07-01
... assessment term, you timely submit a COP meeting the requirements of this subpart, or a complete FERC license... facilities in place on your lease during the time that BOEM reviews your COP for approval or FERC reviews... for facilities that are authorized to remain in place under your approved COP or approved FERC license...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... project can be viewed or printed on the eLibrary link of the Commission's Web site at http://www.ferc.gov... Wisconsin System Inc., Kaukauna Utilities; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene January 29, 2010. On January 25, 2010, NewPage Wisconsin System Inc...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-04
... INFORMATION CONTACT: Pamela Longmire, Ph.D., Project Manager, Licensing Branch, Division of Spent Fuel Storage... Generating Plant (PINGP), Unit Nos. 1 and 2, site in Goodhue County, Minnesota. The TN-40 cask is currently..., higher burnup spent fuel used in the PINGP reactor as well as associated changes to the ISFSI's technical...
14 CFR Appendix C to Part 420 - Risk Analysis
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Risk Analysis C Appendix C to Part 420... TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Pt. 420, App. C Appendix C to Part 420—Risk Analysis (a... table C-1. Table C-1 provides sources where an applicant may obtain data acceptable to the FAA. An...
77 FR 53198 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
..., Fluoride Extraction Process and Depleted Uranium Deconversion Plant, License Application to Construct... River National Forest Oil and Gas Leasing, Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn frommore » the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.« less
10 CFR 40.2a - Coverage of inactive tailings sites.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Coverage of inactive tailings sites. 40.2a Section 40.2a Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL General Provisions § 40.2a Coverage of inactive tailings sites. (a) Prior to the completion of the remedial action, the Commission...
10 CFR 61.44 - Stability of the disposal site after closure.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...
10 CFR 61.44 - Stability of the disposal site after closure.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...
10 CFR 61.44 - Stability of the disposal site after closure.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...
10 CFR 61.44 - Stability of the disposal site after closure.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Stability of the disposal site after closure. 61.44 Section 61.44 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR LAND DISPOSAL OF RADIOACTIVE WASTE Performance Objectives § 61.44 Stability of the disposal site after closure. The disposal...