Sample records for siting permitting construction

  1. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Conditions of construction permits, early site permits... Licenses and Construction Permits § 50.55 Conditions of construction permits, early site permits, combined... conditions; each early site permit is subject to the terms and conditions in paragraph (f) of this section...

  2. 10 CFR 2.104 - Notice of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... work authorization, construction permit, early site permit, or combined license for a facility of the... work authorization, construction permit, early site permit, or combined license for a facility of the... hearing concerning an application for a limited work authorization, construction permit, early site permit...

  3. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  4. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  5. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2011-01-01 2011-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  6. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2013-01-01 2013-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  7. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2010-01-01 2010-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  8. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2014-01-01 2014-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  9. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... costs of the proposed action or an evaluation of alternative energy sources. (3) For other than light... 10 Energy 2 2012-01-01 2012-01-01 false Environmental report-construction permit, early site permit, or combined license stage. 51.50 Section 51.50 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED...

  10. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2014-01-01 2014-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  11. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2012-01-01 2012-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  12. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2013-01-01 2013-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  13. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2010-01-01 2010-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  14. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... concerning the benefits assessment (e.g., need for power) or alternative energy sources if those issues were... 10 Energy 2 2011-01-01 2011-01-01 false Public hearings in proceedings for issuance of construction permits or early site permits; limited work authorizations. 51.105 Section 51.105 Energy NUCLEAR...

  15. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  16. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  17. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  18. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  19. 30 CFR 937.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Facilities Permits, Waste Discharge Permits (ORS 468.900-ORS 468.997), Energy Facility Site Certificates (ORS 469.300-ORS 469.570, ORS 469.990, ORS 469.992) issued by the Energy Facilities Siting Council..., construction and maintenance of dams, dikes or other hydraulic structures or works (ORS 540.350, ORS 540.400...

  20. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  1. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  2. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  3. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  4. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  5. 10 CFR 50.81 - Creditor regulations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provided by law. (d) As used in this section: (1) License includes any license under this chapter, any construction permit under this part, and any early site permit under part 52 of this chapter, which may be... limited to, a site which is the subject of an early site permit under subpart A of part 52 of this chapter...

  6. Inspection of Construction Works According to Polish Construction Law

    NASA Astrophysics Data System (ADS)

    Czemplik, A.

    2015-11-01

    Construction regulations are still different in many European countries, even though the European Union directives have unified many acts for construction works and construction products in the member countries. The scheme of the construction process presented in the paper could be valid for most countries, despite of detailed regulations of legal systems. The number of construction regulations to be followed in order to get the Construction Permit in Poland is rather big, so the time between the start of the investment process and the day when the Construction Permit is issued could be several months. Only licensed professional engineers can play the role of site managers, site inspectors and designers, registered for the given construction project. Duties and responsibilities (civil liability) of these engineers are strictly defined by regulations. The obligatory inspection of construction works should be executed by the licensed site inspectors. Moreover, the works can be incidentally inspected by Authority, banks, insurance companies or designers. Foreign designers and foreign site engineers in order to be allowed by respective Authority to play official roles on Polish construction sites should present documents proving that they can do the same jobs in their countries as per regulations obligatory there.

  7. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  8. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  9. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  10. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites Section 101... nuclear power reactors of essentially the same design to be located at different sites. 1 1 If the design...

  11. 78 FR 65388 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...

  12. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  13. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  14. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  15. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined license.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...

  16. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  17. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  18. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Notice of hearing on application for early review of site... Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application for a... Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice...

  19. 7 CFR 1740.9 - Grant application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... authorized the initiation of digital broadcasting at the project sites. In the event that an FCC construction... advance of funds for that site conditional upon the submission of a construction permit. (j) Compliance... Digital Transition,” and must include the Environmental Questionnaire/Certification, available from RUS...

  20. Oil and Gas Stormwater Permitting Documents

    EPA Pesticide Factsheets

    This final rule exempts construction activities at oil and gas sites from the requirement to obtain an NPDES permit for stormwater discharges except in very limited instances. This rule is effective June 12, 2006.

  1. Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water

  2. Environmental Assessment for the Solar Photovoltaic Array, Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water locations

  3. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  4. 10 CFR 2.604 - Notice of hearing on application for early review of site suitability issues in construction...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Notice of hearing on application for early review of site... AGENCY RULES OF PRACTICE AND PROCEDURE Additional Procedures Applicable to Early Partial Decisions on... Early Partial Decisions on Site Suitability-Construction Permit § 2.604 Notice of hearing on application...

  5. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  6. Majestic C Team, LLC - Clean Water Act Public Notice

    EPA Pesticide Factsheets

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Majestic C Team, LLC., which owns a residential construction site located at 168th St and State St in Omaha, NE for alleged violations of its NPDES permit (permit No. NER11

  7. 10 CFR 50.37 - Agreement limiting access to Classified Information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...

  8. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  9. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  10. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  11. 10 CFR 50.36b - Environmental conditions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Environmental conditions. 50.36b Section 50.36b Energy... § 50.36b Environmental conditions. (a) Each construction permit under this part, each early site permit... conditions will be derived from information contained in the environmental report submitted pursuant to § 51...

  12. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  13. 10 CFR 2.603 - Acceptance and docketing of application for early review of site suitability issues in a...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Acceptance and docketing of application for early review... Procedures Applicable to Early Partial Decisions on Site Suitability Issues in Connection With an Application... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2...

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, A.L.; Purdy, S.; Tempelis, D.

    The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less

  15. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  16. 76 FR 78645 - Auction of FM Broadcast Construction Permits Scheduled for March 27, 2012; Notice and Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... touch upon impermissible subject matters because they may convey pricing information and bidding... FCC auction does not constitute an endorsement by the FCC of any particular service, technology, or... habitats, historical or archaeological sites, Indian religious sites, floodplains, and surface features. In...

  17. Hualapai Wind Project Feasibility Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davidson, Kevin; Randall, Mark; Isham, Tom

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorablemore » conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.« less

  18. Assessment of the living and workplace health and safety conditions of site-resident construction workers in Tehran, Iran.

    PubMed

    Mohseni, Peyman Hossein; Farshad, Ali Asghar; Mirkazemi, Roksana; Orak, Rouhangiz Jamshidi

    2015-01-01

    The purpose of this study was to assess living and workplace safety conditions of construction workers in Tehran, Iran. This cross-sectional study was conducted among 410 construction sites in a municipal area of Tehran whose municipal building permits were issued in 2011. Data on ventilation, workplace safety and hygiene were collected by direct observation and interviews with site foremen. Noise levels were estimated from 10 sound-level-meter stations in the municipality area. Lack of ventilation in the workers' rooms was abundant. Bathrooms were unhygienic and minimum requirements such as lighting and ventilation did not exist in 80% of the cases. In nearly 50% of large construction sites, sewage and garbage disposal were inappropriate. Elevator safety was poor at all sites and no measures for fall prevention were present in over 88% of active construction sites. This study showed that the mean 24-h equivalent continuous sound level Leq was over 70 dB in 80% of the sites during weekdays. The results of this study revealed poor health and safety living and working conditions of construction workers in Tehran.

  19. 10 CFR 100.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Definitions. 100.3 Section 100.3 Energy NUCLEAR REGULATORY... means a combined construction permit and operating license with conditions for a nuclear power facility..., issued pursuant to subpart A of part 52 of this chapter, for a site or sites for one or more nuclear...

  20. 10 CFR 2.402 - Separate hearings on separate issues; consolidation of proceedings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... appendix N of part 50 of this chapter for construction permits for nuclear power reactors of a type... Licenses To Construct and/or Operate Nuclear Power Plants of Identical Design at Multiple Sites § 2.402... proceedings. 2.402 Section 2.402 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING...

  1. 10 CFR 2.603 - Acceptance and docketing of application for early review of site suitability issues in a...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF ORDERS Additional... Issuance of Limited Work Authorizations Early Partial Decisions on Site Suitability-Construction Permit § 2... processing, the Director of the Office of New Reactors or the Director of the Office of Nuclear Reactor...

  2. 76 FR 81932 - Auction of FM Broadcast Construction Permits; Revised Construction Permit Number in Auction 93

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... Construction Permits; Revised Construction Permit Number in Auction 93 AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY: This document announces a change to the construction permit number for one of the FM broadcast construction permits for Auction 93. FOR FURTHER INFORMATION CONTACT: Linda...

  3. 24 CFR 941.303 - Site acquisition proposal.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... least sixty (60) days after proposal submission. (c) Zoning. Evidence that construction or rehabilitation is permitted by current zoning ordinances or regulations or evidence to indicate that needed... stage. (e) Environmental assessment. All available environmental information on the proposed development...

  4. 24 CFR 941.303 - Site acquisition proposal.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... least sixty (60) days after proposal submission. (c) Zoning. Evidence that construction or rehabilitation is permitted by current zoning ordinances or regulations or evidence to indicate that needed... stage. (e) Environmental assessment. All available environmental information on the proposed development...

  5. 75 FR 18193 - Riverbank Minnesota, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... would consist of: (1) A new approximately 135-acre, 30-foot-deep upper reservoir constructed of enclosed... 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``eFiling... filings please go to the Commission's Web site located at http://www.ferc.gov/filing-comments.asp . More...

  6. 75 FR 18189 - Riverbank Minnesota, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... consist of: (1) A new approximately 135-acre, 30-foot-deep upper reservoir constructed of enclosed earth... Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the ``e... filings please go to the Commission's Web site located at http://www.ferc.gov/filing-comments.asp . More...

  7. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  8. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  9. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  10. 10 CFR 50.23 - Construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatton, Ian

    To obtain a permit, to construct, to connect 3x6MW permanent magnet direct drive wind power generators, and to deliver to the ERCOT grid 18MW of renewable energy from up to 5 miles offshore San Pedro Island, Texas. To further develop the site to accommodate up to 1000MW of productivity and thereby drive down the average cost of construction, making offshore wind power economically competitive with alternative sources of energy.

  12. 15 CFR 971.606 - Onshore information.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...

  13. 15 CFR 971.606 - Onshore information.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... environment of port, transport, processing and waste disposal facilities and associated facilities (e.g., maps... to enable NOAA to function as lead agency in preparing permit site-specific environmental impact... construction and operation of the facilities, including waste characteristics and toxicity; (3) Any mitigating...

  14. 40 CFR 144.33 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... characteristics; (2) Within the same well field, facility site, reservoir, project, or similar unit in the same...) The requirements for construction, monitoring, reporting, operation, and abandonment, for all wells...; and (3) The cumulative effects of drilling and operation of additional injection wells are considered...

  15. Biomass power for rural development. Technical progress report, January 1--March 31, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Brief progress reports are presented on the following tasks: design packages for retrofits at the Dunkirk Station; fuel supply and site development plans; major equipment guarantees and project risk sharing; power production commitment; power plant site plan, construction and environmental permits; and experimental strategies for system evaluation. The paper then discusses in more detail the following: feedstock development efforts; clone-site testing and genetic studies; and efforts at outreach, extension and technology transfer.

  16. Hazardous Waste Site Analysis (Small Site Technology)

    DTIC Science & Technology

    1990-08-01

    Act HSRT - Hazardous Substance Response Trust (Superfund Trust) HSWA - Hdzardeus and Solid Waste Amendments (to RCRA) NAAQSD - National Ambient Air...impoundments (basically, any area where hazardous substances are located). * Under CERCLA, "Environment" includes surface and groundwater, ambient air, land...34 provisions with permit requirements for new source construction). " Ambient Air Quality standards (NAAQs) have been issued for six "criteria" pollutants

  17. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  18. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  19. 10 CFR 2.1115 - Designation of issues for adjudicatory hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... at Civilian Nuclear Power Reactors § 2.1115 Designation of issues for adjudicatory hearing. (a) After... reactor already licensed to operate at the site, or any civilian nuclear power reactor for which a... the issuance of a construction permit or operating license for a civilian nuclear power reactor at...

  20. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  1. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  2. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  3. 15 CFR 930.123 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... “energy project” means projects related to the siting, construction, expansion, or operation of any... authorization for the permitting, approval or other authorization of an energy project. (e) The term “lead... financial assistance under subparts F or I of this part for an energy project. [65 FR 77154, Dec. 8, 2000...

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, G.C.

    The Environmental Restoration Disposal Facility (ERDF) is to accept both CERCLA (EPA-regulated) and RCRA (Ecology-regulated) remediation waste. The ERDF is considered part of the overall remediation strategy on the Hanford Site, and as such, determination of ERDF viability has followed both RCRA and CERCLA decision making processes. Typically, determination of the viability of a unit, such as the ERDF, would occur as part of record of decision (ROD) or permit modification for each remediation site before construction of the ERDF. However, because construction of the ERDF may take a significant amount of time, it is necessary to begin design andmore » construction of the ERDF before final RODs/permit modifications for the remediation sites. This will allow movement of waste to occur quickly once the final remediation strategy for the RCRA and CERCLA past-practice units is determined. Construction of the ERDF is a unique situation relative to Hanford Facility cleanup, requiring a Hanford Facility specific process be developed for implementing the ERDF that would satisfy both RCRA and CERCLA requirements. While the ERDF will play a significant role in the remediation process, initiation of the ERDF does not preclude the evaluation of remedial alternatives at each remediation site. To facilitate this, the January 1994 amendment to the Tri-Party Agreement recognizes the necessity for the ERDF, and the Tri-Party Agreement states: ``Ecology, EPA, and DOE agree to proceed with the steps necessary to design, approve, construct, and operate such a ... facility.`` The Tri-Party Agreement requires the DOE-RL to prepare a comprehensive ``package`` for the EPA and Ecology to consider in evaluating the ERDF. The package is to address the criteria listed in 40 CFR 264.552(c) for corrective action management unit (CAMU) designation and a CERCLA ROD. This CAMU application is submitted as part of the Tri-Party Agreement-required information package.« less

  5. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ...] Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit Program Fee Increases; Construction Permit Regulation of PM 2.5 ; Regulation 3 AGENCY: Environmental Protection Agency... construction permit processing fees. EPA proposes approval of Colorado's May 25, 2011 submittal, which...

  6. 76 FR 80366 - Availability of an Environmental Assessment (EA) and Finding of No Significant Impact (FONSI)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ...) General Permit for Discharges from Construction Activities (2012 Construction General Permit). The EA... runoff from construction activities greater than one acre, where EPA is the permitting authority. Based... significant environmental impacts are anticipated from the issuance of the 2012 Construction General Permit...

  7. Worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry

    NASA Astrophysics Data System (ADS)

    Hafiidz, J. Mohd; Arifin, K.; Aiyub, K.; Razman, M. R.; Samsurijan, M. S.; Syakir, M. I.

    2017-09-01

    Construction industry is an important sector that contributes to the development of economy and socioeconomy in Malaysia. It is a vital component in achieving the developed country status. However, fatalities in the Malaysian construction industry are a critical problem. Number of fatalities in this industry is the highest compared to other industries registered in Malaysia under the investigation of Department of Occupational Safety and Health (DOSH). Worksite element (worksite conditions, poor site management, construction tasks, and equipment & materials) was identified as one category of causes of occupational accidents and illnesses in Malaysian construction industry. The main objective of this study is to understand the perception of local construction personnel in terms of worksite element as causes of occupational accidents and illnesses in Malaysian residential construction industry. 13 housing projects that were registered with Ministry of Urban Wellbeing, Housing and Local Government and being permitted to perform construction work in 2012 were selected in Pulau Pinang to be studied using questionnaire survey. Worksite condition and poor site management was perceived as the most significant with the mean values of 3.68 and 3.61 respectively.

  8. 76 FR 22891 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  9. 76 FR 40355 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... (NPDES) general permits for stormwater discharges associated with construction activity in order to... permits will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' This...

  10. The human factor in mining reclamation

    USGS Publications Warehouse

    Arbogast, Belinda F.; Knepper, Daniel H.; Langer, William H.

    2000-01-01

    Rapid urbanization of the landscape results in less space available for wildlife habitat, agriculture, and recreation. Mineral resources (especially nonmetallic construction materials) become unrecoverable due to inaccessibility caused by development. This report both describes mine sites with serious problems and draws attention to thoughtful reclamation projects for better future management. It presents information from selected sites in terms of their history, landform, design approach, and visual discernment. Examples from Colorado are included to introduce the broader issue of regions soundly developing mining sites, permitting the best utilization of natural resources, and respecting the landscape.

  11. 75 FR 74719 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Television Station Construction Permits Scheduled for February 15, 2011; Notice and Filing Requirements... upcoming auction of certain VHF commercial TV construction permits (Auction 90). This document is intended... December 15, 2010. Bidding for construction permits in Auction 90 is scheduled to begin on February 15...

  12. Detailed Project Report on Emergency Shoreline Protection, Section 14 Boggy Bayou, Valparaiso, Florida

    DTIC Science & Technology

    1989-08-01

    adjacent to Bayshore Drive. Along the shoreline within the current study area, (see Plate 4) private residents have constructed three wood piers and...a wood boat shed. The construction of piers and boat sheds is no longer permitted by the city. However, the piers and boat shed were allowed to remain...located in the project site. Removal and 6 replacement of the 3 wood piers and the boat shed and the steps that lead to them will be a responsibility of

  13. National Dam Safety Program. Stony Brook Watershed Dam Site Number 7 (NJ00344), Raritan River Basin, Stony Brook, Mercer County, New Jersey. Phase 1 Inspection Report.

    DTIC Science & Technology

    1980-02-01

    for Permit for Construction and Repair of Dam" filed on March 16, 1959. f. Design and Construction History Design data on file with NJDEP include: 1...LAr- Us a-2. hr’s. LA9~ WATF=R? SiQ_~~- SL- !E q VOL ( YFv - mcA>-) (Acmr-- =T.) 2o4~ 2-Ito STORCH ENGINEERS shootL... of 11. Project FmnnK Wmr=X---A-1

  14. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance... revocable road use and construction permits to users for the purpose of removing forest products. (b) When a...

  15. 76 FR 60830 - Auction of FM Broadcast Construction Permits Scheduled for March 27, 2012; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... Construction Permits Scheduled for March 27, 2012; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM broadcast construction permits scheduled to commence on March 27, 2012. This... construction permits and seek comment on the procedures to be used for this auction. This auction is scheduled...

  16. 78 FR 72081 - Closed Auction of AM Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Broadcast Construction Permits Scheduled for May 6, 2014; Comment Sought on Competitive Bidding Procedures... announces the auction of certain AM broadcast construction permits. Auction 84 will be a ``closed'' auction..., New York. II. Construction Permits In Auction 84 2. The Bureaus will proceed to auction for 22 new...

  17. 76 FR 6811 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ...] Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II Wind Energy... application from Kaheawa Wind Power II, LLC (KWP II) for an incidental take permit (permit) under the... construction and operation of the KWP II wind energy facility on the island of Maui. The permit application...

  18. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  19. EPA's Draft 2017 Construction General Permit (CGP)

    EPA Pesticide Factsheets

    EPA is preparing to reissue the Construction General Permit (CGP). The general permit, issued under the Clean Water Act's National Pollutant Discharge Elimination System, authorizes stormwater discharges from construction activities.

  20. 75 FR 4554 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Construction Activities AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: EPA Regions 1... System (NPDES) general permits for stormwater discharges associated with construction activity in order... will be referred to as ``permit'' or ``2008 construction general permit'' or ``2008 CGP.'' The 2008 CGP...

  1. 21 CFR 528.1070 - Bc6 recombinant deoxyribonucleic acid construct.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 155-92 site in a specific hemizygous diploid line of dairy breeds of domestic goats (Capra aegagrus... of humans) in the mammary gland of goats derived from lineage progenitor 155-92. (b) Sponsor. See No. 042976 in § 510.600 of this chapter. (c) Limitations. Food or feed from GTC-155-92 goats is not permitted...

  2. 21 CFR 528.1070 - Bc6 recombinant deoxyribonucleic acid construct.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 155-92 site in a specific hemizygous diploid line of dairy breeds of domestic goats (Capra aegagrus... of humans) in the mammary gland of goats derived from lineage progenitor 155-92. (b) Sponsor. See No. 042976 in § 510.600 of this chapter. (c) Limitations. Food or feed from GTC-155-92 goats is not permitted...

  3. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  4. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  5. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  6. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  7. 10 CFR 140.13 - Amount of financial protection required of certain holders of construction permits and combined...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., possession and storage only of special nuclear material at the site of the nuclear reactor for use as fuel in operation of the nuclear reactor after issuance of either an operating license under 10 CFR part 50 or... NUCLEAR REGULATORY COMMISSION (CONTINUED) FINANCIAL PROTECTION REQUIREMENTS AND INDEMNITY AGREEMENTS...

  8. 10 CFR 52.39 - Finality of early site permit determinations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Finality of early site permit determinations. 52.39... NUCLEAR POWER PLANTS Early Site Permits § 52.39 Finality of early site permit determinations. (a) Commission finality. (1) Notwithstanding any provision in 10 CFR 50.109, while an early site permit is in...

  9. 10 CFR 52.39 - Finality of early site permit determinations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Finality of early site permit determinations. 52.39... NUCLEAR POWER PLANTS Early Site Permits § 52.39 Finality of early site permit determinations. (a) Commission finality. (1) Notwithstanding any provision in 10 CFR 50.109, while an early site permit is in...

  10. 78 FR 28547 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... each construction permit exemption claim. WDNR held public hearings on June 27, 28 and 29, 2006, for... required to respond to the construction permit exemption claim submitted. NR 406.04(1q)(1) and (5) for... pollution from construction permit requirements. EPA is proposing to approve these revisions because they...

  11. 75 FR 61752 - Auction of FM Broadcast Construction Permits Scheduled for March 29, 2011; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ... Construction Permits Scheduled for March 29, 2011; Comment Sought on Competitive Bidding Procedures for Auction... auction of certain FM construction permits scheduled to commence on March 29, 2011 (Auction 91). This... Telecommunications and the Media Bureaus (the Bureaus) announce an auction of certain FM Broadcast construction...

  12. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  13. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  14. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  15. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  16. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  17. Brentwood Lessons Learned Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl H.; Caton, Melanie C.; Ainscough, Christopher D.

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modularmore » hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.« less

  18. 40 CFR 49.155 - Permit requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to your permit if you are subject to this program under § 49.153(a) for construction of a new... of the permit and the date by which you must commence construction in order for your permit to remain... determine compliance with the permit. For any such information claimed to be confidential, you must also...

  19. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  20. 33 CFR 115.60 - Procedures for handling applications for bridge construction permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... applications for bridge construction permits. 115.60 Section 115.60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.60 Procedures for handling applications for bridge construction permits. The following procedures will be...

  1. 10 CFR 52.28 - Transfer of early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Transfer of early site permit. 52.28 Section 52.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.28 Transfer of early site permit. An application to transfer an early site...

  2. 10 CFR 52.28 - Transfer of early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transfer of early site permit. 52.28 Section 52.28 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.28 Transfer of early site permit. An application to transfer an early site...

  3. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  4. 47 CFR 73.4015 - Applications for AM and FM construction permits, incomplete or defective.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Applications for AM and FM construction permits, incomplete or defective. 73.4015 Section 73.4015 Telecommunication FEDERAL COMMUNICATIONS COMMISSION....4015 Applications for AM and FM construction permits, incomplete or defective. See Public Notice, FCC...

  5. 77 FR 18990 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... reviewing and acting on specific air quality construction permit applications received by the New Mexico... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... replace existing rules, and revisions to the applicable State Implementation Plan (SIP) for New Mexico...

  6. 10 CFR 52.27 - Limited work authorization after issuance of early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Limited work authorization after issuance of early site..., AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.27 Limited work authorization after issuance of early site permit. A holder of an early site permit may request a limited work authorization in...

  7. 10 CFR 52.27 - Limited work authorization after issuance of early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Limited work authorization after issuance of early site..., AND APPROVALS FOR NUCLEAR POWER PLANTS Early Site Permits § 52.27 Limited work authorization after issuance of early site permit. A holder of an early site permit may request a limited work authorization in...

  8. 75 FR 8070 - Closed Auction of Broadcast Construction Permits Scheduled for July 20, 2010; Auction 88...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Construction Permits Scheduled for July 20, 2010; Auction 88 Applicants Must Provide Supplemental Information..., AM, and FM Translator construction permits scheduled to commence on July 20, 2010 (Auction 88). This.... Any envelopes must be disposed of before entering the building. Commercial overnight mail (other than...

  9. 40 CFR 49.9868 - Permits to construct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9868 Permits to construct. Permits to...

  10. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  11. 40 CFR 147.2924 - Area permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application; (2) All wells are within the same well field, project, reservoir or similar unit; (3) All wells... construction, monitoring, reporting, operation and abandonment for all wells authorized by the permit. (c) Area permits can authorize the construction and operation of new wells within the permit area, if: (1) The...

  12. Submillimeter Atmospheric Transparency at Maunakea, at the South Pole, and at Chajnantor

    NASA Astrophysics Data System (ADS)

    Radford, Simon J. E.; Peterson, Jeffery B.

    2016-07-01

    For a systematic assessment of submillimeter observing conditions at different sites, we constructed tipping radiometers to measure the broad band atmospheric transparency in the window around 350 μm wavelength. The tippers were deployed on Maunakea, Hawaii, at the South Pole, and in the vicinity of Cerro Chajnantor in northern Chile. Identical instruments permit direct comparison of these sites. Observing conditions at the South Pole and in the Chajnantor area are better than on Maunakea. Simultaneous measurements with two tippers demonstrate conditions at the summit of Cerro Chajnantor are significantly better than on the Chajnantor plateau.

  13. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Revocable road use and construction permits for removal of... road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  14. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  15. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  16. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance with 25 U.S.C. 415 as amended, the Secretary may request tribes and/or other beneficial owners to sign...

  17. 10 CFR 52.24 - Issuance of early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Issuance of early site permit. 52.24 Section 52.24 Energy... Early Site Permits § 52.24 Issuance of early site permit. (a) After conducting a hearing under § 52.21 and receiving the report to be submitted by the ACRS under § 52.23, the Commission may issue an early...

  18. 10 CFR 52.24 - Issuance of early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Issuance of early site permit. 52.24 Section 52.24 Energy... Early Site Permits § 52.24 Issuance of early site permit. (a) After conducting a hearing under § 52.21 and receiving the report to be submitted by the ACRS under § 52.23, the Commission may issue an early...

  19. Evaluating the effectiveness of best management practices and green infrastructure in the State of California

    EPA Science Inventory

    Since 2010, the State of California has required construction operators to utilize the electronic Storm Water Application and Report Tracking System (SMARTS) for construction projects covered by the General Construction Permit. The General Construction permit encourages BMP and G...

  20. Vertical flow constructed wetlands for municipal wastewater and septage treatment in French rural area.

    PubMed

    Paing, J; Voisin, J

    2005-01-01

    This paper presents the purification performance of 20 wastewater treatment plants with vertical reed bed filters (Macrophyltres), built between 1998 and 2003 by SAS Voisin, for communities of between 150 and 1400 PE. The first stage vertical reed bed (directly fed with raw wastewater by intermittent feeding) achieved high removal of SS, BOD and COD (mean respectively 96%, 98%, 92%). The second stage permitted compliance easily with effluent standards (SS < 15 mg/l, BOD < 15 mg/l, COD < 90 mg/l and mean TKN < 10 mg/l). Performance was not significantly influenced by variations of organic and hydraulic load, nor by seasonal variations. Rigorous operation and maintenance were required to obtain optimal performances. Another application of vertical reed beds is the treatment of septage (sludge from individual septic tanks). The results obtained on two sites operating for 2 and 3 years are presented. The first site achieved complete treatment of septage (solid and liquid fraction), the second permitted a pre-treatment for co-treatment of percolate with wastewater.

  1. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 1 2013-07-01 2013-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  2. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 1 2011-07-01 2011-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  3. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 1 2012-07-01 2012-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  4. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 1 2014-07-01 2014-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  5. 28 CFR 36.401 - New construction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false New construction. 36.401 Section 36.401... ACCOMMODATIONS AND IN COMMERCIAL FACILITIES New Construction and Alterations § 36.401 New construction. (a...— (i) If the last application for a building permit or permit extension for the facility is certified...

  6. Evaluation of Heavy Metals in Solid Waste Disposal Sites in Campinas City, Brazil Using Synchrotron Radiation Total Reflection X-Ray Fluorescence

    NASA Astrophysics Data System (ADS)

    de Faria, Bruna Fernanda; Moreira, Silvana

    2011-12-01

    The problem of solid waste in most countries is on the rise as a result of rapid population growth, urbanization, industrial development and changes in consumption habits. Amongst the various forms of waste disposals, landfills are today the most viable for the Brazilian reality, both technically and economically. Proper landfill construction practices allow minimizing the effects of the two main sources of pollution from solid waste: landfill gas and slurry. However, minimizing is not synonymous with eliminating; consequently, the landfill alone cannot resolve all the problems with solid waste disposal. The main goal of this work is to evaluate the content of trace elements in samples of groundwater, surface water and slurry arising from local solid waste disposals in the city of Campinas, SP, Brazil. Samples were collected at the Delta, Santa Barbara and Pirelli landfills. At the Delta and Santa Barbara sites, values above the maximum permitted level established by CETESB for Cr, Mn, Fe, Ni and Pb were observed in samples of groundwater, while at the Pirelli site, elements with concentrations above the permitted levels were Mn, Fe, Ba and Pb. At Delta, values above levels permitted by the CONAMA 357 legislation were still observed in surface water samples for Cr, Mn, Fe and Cu, whereas in slurry samples, values above the permitted levels were observed for Cr, Mn, Fe, Ni, Cu, Zn and Pb. Slurry samples were prepared in accordance with two extraction methodologies, EPA 3050B and EPA 200.8. Concentrations of Cr, Ni, Cu and Pb were higher than the limit established by CONAMA 357 for most samples collected at different periods (dry and rainy) and also for the two extraction methodologies employed.

  7. 78 FR 8193 - In the Matter of Virginia Electric and Power Company, and Old Dominion Electric Cooperative; ESP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0476; Docket No. 52-008 Early Site Permit No. ESP-003] In... North Anna ESP Site; Order Approving Direct Transfer of Early Site Permit and Approving Conforming... Dominion Electric Cooperative (ODEC), hold Early Site Permit 003 (ESP-003) for North Anna Site issued on...

  8. Ecological Monitoring and Compliance Program 2011 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, D. J.; Anderson, D. C.; Hall, D. B.

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada National Security Site and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program's activities conducted by National Security Technologies, LLC, during calendar year 2011. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test and Evaluation Complex. Duringmore » 2011, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  9. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  10. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  11. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  12. 40 CFR 52.343 - Significant deterioration of air quality.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... constructed prior to September 2, 1986 and which have not otherwise subjected themselves to Colorado's PSD permitting regulations after September 2, 1986, either through application to Colorado for a PSD permit (in the case of those sources which improperly constructed without obtaining a PSD permit) or through...

  13. 46 CFR 287.7 - Circumstances permitting reimbursement from a construction reserve fund.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Circumstances permitting reimbursement from a... Circumstances permitting reimbursement from a construction reserve fund. (a) Payments prior to establishment of... this part, draw against such fund as reimbursement for the amount, if any, of other funds which, with...

  14. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    EPA Pesticide Factsheets

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  15. Environmental Assessment for ’Community Beach Center’ (RCS 04-899 & 05-350)

    DTIC Science & Technology

    2005-12-19

    with the olive ridley , the Kemp’s ridley (Lepidocheyls kempi) is the smallest of the sea turtle species. Kemp’s ridleys are considered to be the most...Alternative C is the preferred alternative. No Action Alternative: Under the No Action Altemative, a Community Beach Center would not be constructed at...funding permits, expand the facility along the lines of Alternative A. This is preferred alternative. Figure 6 illustrates the site plan for the

  16. Navato Center Regulatory Permit Application by Novato Center Inc. Marin County, California Public Notice 10138-33R.

    DTIC Science & Technology

    1980-11-01

    2.317 Alternative #2R 91 2.319 Alternative #3 91 2.320 Alternative #4 92 2.321 Alternative #5 92 2.322 Gas /Electricity 92 2.323 Alternative #1 92...runoff fromt on-site Pollutants (litter, oil , fertilizer, pesticides, animal wastes). - Increased erosion and turbidity in runoff during construction...costs to the City of Novato. 1. Public Services/Utilities. - Increased consumption of gas , electricity and water. - Increased wastewater generation

  17. An investigation into the utilization of HCMM thermal data for the descrimination of volcanic and Eolian geological units. [Craters of the Moon volcanic field, Idaho; San Francisco volcanic field, Arizona; High Desert, California; and the Cascade Range, California and Oregon

    NASA Technical Reports Server (NTRS)

    Head, J. W., III (Principal Investigator)

    1982-01-01

    Analysis of HCMM data shows that the resolution provided by the thermal data is inadequate to permit the identification of individual lava flows within the volcanic test sites. Thermal data of southern California reveals that dune complexes at Kelso and Algodomes are found to be too small to permit adequate investigation of their structure. As part of the study of the San Francisco volcanic field, marked variations in the thermal properties of the region between Flagstaff and the Utah State border were observed. Several well-defined units within the Grand Canyon and the Colorado Plateau were recognized and appear to be very suitable for analysis with HCMM, SEASAT and LANDSAT images. Although individual volcanic constructs within the Cascade Range are too small to permit detailed characterization with the thermal data, the regional volcano/tectonic setting offers a good opportunity for comparing the possible thermal distinction between this area and sedimentary fold belts such as those found in the eastern United States. Strong intra-regional variations in vegetation cover were also tentatively identified for the Oregon test site.

  18. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  19. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  20. 47 CFR 73.3533 - Application for construction permit or modification of construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Changes in a Low Power TV, TV Translator or TV Booster Station.” (6) FCC Form 349, “Application for Authority to Construct or Make Changes in an FM Translator or FM Booster Station.” (7) FCC Form 318...

  1. 25 CFR 166.316 - Can a permittee construct improvements on permitted Indian land?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a permittee construct improvements on permitted Indian land? 166.316 Section 166.316 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation Practices and Improvements § 166...

  2. 78 FR 40968 - Notice of Extension of Deadline to Commence Construction Under Clean Air Act Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ...'') has extended the Prevention of Significant Deterioration (``PSD'') permit deadline for commencing construction for a final Clean Air Act PSD permit that authorizes Avenal Power Center, LLC (``APC'') to...: EPA's PSD permit for the AEP became effective on August 18, 2011, and included a deadline for...

  3. 77 FR 16853 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... construction of a commercial development, and seeks a 5-year permit. The 7.7-ac project is located on parcel 09... project includes construction of a commercial development and the associated infrastructure, and...

  4. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  5. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  6. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  7. 33 CFR 323.4 - Discharges not requiring permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... discrete structures and the installation of support facilities necessary for construction and utilization... construction of any canal, ditch, dike or other waterway or structure which drains or otherwise significantly... construction of any such structure or waterway requires a permit. (D) Plowing means all forms of primary...

  8. 76 FR 24874 - Initiation of Scoping for an Environmental Assessment (EA)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-03

    ...) General Permit for Discharges from Construction Activities. The EA will evaluate the potential environmental impacts from the discharge of pollutants associated with stormwater runoff from construction... days of the date of the publication of the Proposed Construction General Permit in the Federal Register...

  9. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  10. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  11. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  12. 47 CFR 73.3598 - Period of construction.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... a showing of good cause. The LPFM permittee must file for an extension on or before the expiration... original construction permit shall toll when construction is prevented by the following causes not under... natural disasters (e.g., floods, tornados, hurricanes, or earthquakes); (2) The grant of the permit is the...

  13. 25 CFR 166.317 - What happens to improvements constructed on Indian lands when the permit has been terminated?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What happens to improvements constructed on Indian lands when the permit has been terminated? 166.317 Section 166.317 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Land and Operations Management Conservation...

  14. 78 FR 63489 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    .... Herrington, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE15414B-0... construction of commercial developments, and they seek a 10-year permit. The 7.81-ac project is located on... East, Lake County, Florida. The project includes construction of a commercial development and the...

  15. Space Programs Summary 37-33. Volume 3. The Deep Space Network for the period 1 March-30 April 1965

    DTIC Science & Technology

    1965-05-31

    designed to communicate To improve the data rate and distance capability, a 210-ft with, and permit control of, spacecraft designed for deep antenna is...51 experienced doppler problems. It was neces- tracking momentarily to make this change. It was de - sary to determine the bias oscillator frequencies...is being designed and constructed for the Mars site of the Gold- stone space communications station. The operating fre- quency of the AAS will be at

  16. Ecological Monitoring and Compliance Program 2010 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, D.J.; Anderson, D.C.; Hall, D.B.

    The Ecological Monitoring and Compliance (EMAC) Program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2010. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring of the Nonproliferation Test andmore » Evaluation Complex (NPTEC). During 2010, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  17. Ecological Monitoring and Compliance Program 2012 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hall, Derek B.; Anderson, David C.; Greger, Paul D.

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2012. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat restoration monitoring, and (g) monitoring ofmore » the Nonproliferation Test and Evaluation Complex (NPTEC). During 2012, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  18. Ecological Monitoring and Compliance Program 2009 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, J. Dennis; Anderson, David C.; Hall, Derek B.

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC, during calendar year 2009. Program activities included (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferationmore » Test and Evaluation Complex. During 2009, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives.« less

  19. New multifunctional Escherichia coli-Streptomyces shuttle vectors allowing blue-white screening on XGal plates.

    PubMed

    Wehmeier, U F

    1995-11-07

    Four new shuttle vectors for Escherichia coli (Ec) and Streptomyces, pUWL218, pUWL219, pUWL-SK and pUWL-KS, which permit recognition of recombinant (re-) plasmids on XGal plates in Ec, were constructed. These vectors contain the replication functions of the Streptomyces wide-host-range multicopy plasmid pIJ101, the tsr gene conferring resistance to thiostrepton in Streptomyces, the ColEI origin of replication from the pUC plasmids for replication in Ec and the bla gene conferring resistance to ampicillin in Ec. They possess multiple cloning sites with a number of unique restriction sites and allow direct sequencing of re-derivatives using the pUC sequencing primers.

  20. Polynomial Conjoint Analysis of Similarities: A Model for Constructing Polynomial Conjoint Measurement Algorithms.

    ERIC Educational Resources Information Center

    Young, Forrest W.

    A model permitting construction of algorithms for the polynomial conjoint analysis of similarities is presented. This model, which is based on concepts used in nonmetric scaling, permits one to obtain the best approximate solution. The concepts used to construct nonmetric scaling algorithms are reviewed. Finally, examples of algorithmic models for…

  1. 77 FR 71713 - Policies To Promote Rural Radio Service and To Streamline Allotment and Assignment Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...

  2. 77 FR 47065 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... activities: Construction Buildings........ 236 Heavy and Civil Engineering 237 Construction. EPA does not... permit may not be challenged later in civil or criminal proceedings to enforce these requirements. In...

  3. GPS Installation Progress in the Northern California Region of the Plate Boundary Observatory Coyle, B., Basset, A., Williams, T., Enders, M., Feaux, K., Jackson, M.

    NASA Astrophysics Data System (ADS)

    Coyle, B.; Basset, A.; Enders, M.; Williams, T.; Feaux, K.; Jackson, M.

    2005-12-01

    The Plate Boundary Observatory (PBO) is the geodetic component of the NSF funded EarthScope Project . The final PBO GPS network will comprise 875 continuously operating GPS stations installed throughout the Western US and Alaska. There are 435 stations planned for California with 229 of these in Northern California (NCA). This poster will present the past year's progress of GPS installations in NCA. At the end of the first year of the Project, PBO NCA installed 12 stations. During the second year, another 56 were installed for a total of 68 stations including 18 SDBM, and 50 DDBM. We have sited 128 stations, submitted 112 permit applications and received 73 permits. A particularly important statistic for planning our schedules is the time lag between reconnaissance and permit accepted; our average thus far is 137 days. We have been particularly successful locating stations on Caltrans Rights of Way with 20 Stations built, 3 sites permitted and 5 permits pending. Other land use partners include: East Bay Regional Parks - 8 Stations built and 2 sites permitted, Bureau of Land Management - 5 Stations built, 3 permits pending, Water Municipalities - 4 Stations built, 3 sites permitted and 4 permits pending, and Airports - 4 Stations built and 3 permits pending. Highlights from last year: On September 28, 2004 a Mw 6.0 earthquake occurred on the San Andreas Fault seven miles southeast of the town of Parkfield, CA. Field crews from the Northern and Southern California offices of PBO began the site reconnaissance and permitting process the day after the earthquake and installation of the first Station was begun within 36 hours and completed the following day. In total, 5 Stations were installed by the first week of November. On June 14, 2045 a Mw 7.1 earthquake occurred on the Gorda Plate, approximately 100 miles NW of Eureka. PBO stations, P158, P162, P169 and P170, recorded coseismic deformation associated with this event. We plan to have 127 stations built by the end of the current project year. In order to meet this goal we intend to focus our efforts on two areas, National Forests (NF) sites in the Coast Ranges, and sites in the area around Hollister and San Juan Bautista. We expect the recon-to-permit period to be somewhat longer for the NF sites, possibly up to one year, so we have already submitted applications for our sites in the Mendocino and Shasta-Trinity NF. This should enable us to begin these installations next summer. We will submit permit applications for the remaining NF by the end of next year. By end of the year we hope to have permit applications submitted for all 229 of our proposed sites, so we can then focus our efforts on installations and revisiting "problem" sites.

  4. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  5. 40 CFR 60.1090 - What must I do with my revised materials separation plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30... Administrator by the date you submit the application for a construction permit under 40 CFR part 51, subpart I, or part 52. (If you are not required to submit an application for a construction permit under 40 CFR...

  6. Wildlife conservation and solar energy development in the Desert Southwest, United States

    USGS Publications Warehouse

    Lovich, Jeffrey E.; Ennen, Josua R.

    2011-01-01

    Large areas of public land are currently being permitted or evaluated for utility-scale solar energy development (USSED) in the southwestern United States, including areas with high biodiversity and protected species. However, peer-reviewed studies of the effects of USSED on wildlife are lacking. The potential effects of the construction and the eventual decommissioning of solar energy facilities include the direct mortality of wildlife; environmental impacts of fugitive dust and dust suppressants; destruction and modification of habitat, including the impacts of roads; and off-site impacts related to construction material acquisition, processing, and transportation. The potential effects of the operation and maintenance of the facilities include habitat fragmentation and barriers to gene flow, increased noise, electromagnetic field generation, microclimate alteration, pollution, water consumption, and fire. Facility design effects, the efficacy of site-selection criteria, and the cumulative effects of USSED on regional wildlife populations are unknown. Currently available peer-reviewed data are insufficient to allow a rigorous assessment of the impact of USSED on wildlife.

  7. 47 CFR 1.2003 - Applications affected.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignment of Authorization and Transfer of Control; FCC... for Consent to Transfer of Control of Corporation Holding Broadcast Station Construction Permit or... License or Transfer of Control of Corporation Holding Radio Broadcast Station Construction Permit or...

  8. Secure web-based access to radiology: forms and databases for fast queries

    NASA Astrophysics Data System (ADS)

    McColl, Roderick W.; Lane, Thomas J.

    2002-05-01

    Currently, Web-based access to mini-PACS or similar databases commonly utilizes either JavaScript, Java applets or ActiveX controls. Many sites do not permit applets or controls or other binary objects for fear of viruses or worms sent by malicious users. In addition, the typical CGI query mechanism requires several parameters to be sent with the http GET/POST request, which may identify the patient in some way; this in unacceptable for privacy protection. Also unacceptable are pages produced by server-side scripts which can be cached by the browser, since these may also contain sensitive information. We propose a simple mechanism for access to patient information, including images, which guarantees security of information, makes it impossible to bookmark the page, or to return to the page after some defined length of time. In addition, this mechanism is simple, therefore permitting rapid access without the need to initially download an interface such as an applet or control. In addition to image display, the design of the site allows the user to view and save movies of multi-phasic data, or to construct multi-frame datasets from entire series. These capabilities make the site attractive for research purposes such as teaching file preparation.

  9. Health assessment for Lake Sandy Jo Landfill, Gary, Indiana, Region 5. CERCLIS No. IND980500524. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-11-21

    The 50-acre Lake Sandy Jo Landfill is located in the Black Oak community (predominantly residential) of southwestern Gary in Lake County, Indiana. From about 1971 until about 1980, the lake was filled in with construction and demolition debris, municipal garbage, industrial wastes, hazardous materials, and possibly drummed wastes. These wastes are partly to completely exposed on the landfill surface. Surface soil, subsurface soil, surface water, sediment, and ground water show a variety of metal and organic chemical carcinogens. Toxic noncarcinogen priority pollutants found were chloromethane, copper, cyanide, lead, mercury, and silver. Inorganic soil levels found on the site for leadmore » and cadmium exceed levels of concern that would permit unrestricted use of the site. Remedial measures would be necessary before the site could be granted unrestricted use.« less

  10. Mississippi SIP: Title 11, Part 2, Chapter 2 - Permit Regulations for the Construction and/or Operation of Air Emissions Equipment

    EPA Pesticide Factsheets

    Permit Regulations for the Construction and/or Operation of Air Emissions Equipment involved in ambient air quality standards & regulations in MS + where to obtain copies of referenced federal regulations

  11. 47 CFR 73.3500 - Application and report forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Wireless Telecommunications Bureau Application for Assignments of Authorization and Transfers of Control... Station Construction Permit or License. 315 Application for Consent to Transfer of Control of Corporation... Broadcast Station Construction Permit or License or Transfer of Control of Corporation Holding Broadcast...

  12. Iowa SIP: Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

    EPA Pesticide Factsheets

    EPA Approved Iowa Regulations - 40 CFR 52.820(c) Chapter 33 - Special Regulations and Construction Permit Requirements for Major Stationary Sources - Prevention of Significant Deterioration (PSD) of Air Quality

  13. Life Cycle Inventory (LCI) Data-Treatment Chemicals ...

    EPA Pesticide Factsheets

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inventory (LCI) data extracted from secondary data sources and compiled using the openLCA software package. The US EPA MOVES 2014 model was used to derive EmFs from combustion profiles for a number of transportation and on-site equipment processes. The EmFs were calculated for use in US EPA’s Spreadsheets for Environmental Footprint Analysis (SEFA). EmFs are reported for cumulative energy demand (CED), global warming potential (GWP), criteria pollutants (e.g. NOX, SOX, and PM10), hazardous air pollutants (HAPs), and water use. Since the USEPA launched its green remediation program, metrics such as impacts, outcomes, and environmental burdens of remediation actions have been difficult to assess. This research includes metrics to quantify RCRA and CERCLA remediation actions. Metrics include: greenhouse gases, energy demand, water use, SOX, NOX, PM10, and hazardous air pollutants. The primary user of this project is EPA's Region 9 Superfund and Technology Office for input into the SEFA tool. SEFA is a set of analytical workbooks used to quantify the environmental footprint of a site cleanup in order to achieve a greener cleanup. SEFA permits users to enter actual or anticipated data on site

  14. State summaries: Oklahoma

    USGS Publications Warehouse

    Krukowski, S.T.

    2006-01-01

    In 2005, Oklahoma mines produced both industrial minerals and coal. No metals were mined in the state. Based on value, leading industrial minerals include crushed stone followed by cement, construction sand and gravel, industrial sand and gravel, iodine and gypsum. The Oklahoma Department of Mines (ODOM) reported that more than 343 mine operators produced nonfuel minerals from 405 mines in the state. However, 530 mining permitted sites were on file. The Oklahoma Miner Training Institute (OMTI) held 239 classes for 33,768 classroom hours of instruction, in which 84 coal miners and 4,587 metal/nonmetal miners were trained.

  15. NREL/University of Delaware Offshore Wind R&D Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-10-393

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Musial, Walt

    2015-11-12

    Specifically, the work under this CRADA includes, but is not limited to, the development of test procedures for an offshore test site in Delaware waters; testing of installed offshore wind turbines; performance monitoring of those turbines; and a program of research and development on offshore wind turbine blades, components, coatings, foundations, installation and construction of bottom-fixed structures, environmental impacts, policies, and more generally on means to enhance the reliability, facilitate permitting, and reduce costs for offshore wind turbines. This work will be conducted both at NREL's National Wind Technology Center and participant facilities, as well as the established offshore windmore » test sites.« less

  16. Hydrothermal vent community zonation along environmental gradients at the Lau back-arc spreading center

    NASA Astrophysics Data System (ADS)

    Kim, Stacy; Hammerstrom, Kamille

    2012-04-01

    The Lau back-arc spreading center exhibits gradients in hydrothermal vent habitat characteristics from north to south. Biological zonation within a few meters of vents has been described as temperature driven. We constructed georeferenced photomosaics of the seafloor out to tens of meters beyond vents to describe peripheral zonation and explore correlations between environmental conditions and the biological community. Cluster analysis separated northern sites from southern sites, corresponding to a break in substrate from basalt in the north to andesite in the south. Northern sites were dominated by anemones, and southern by sponges. A previous suggestion that dominants may be dependent on friability of the substrate was not supported; when visually distinguishable, individual species within taxa showed different patterns. Northern sites hosted proportionally more suspension feeding species. Sulfide that can support microbial food sources is at higher concentrations at these sites, though bathymetry that may enhance bottom currents is less rugged. Northern sites had higher diversity that may result from the overall northwards flow, which would generally permit easier dispersal downcurrent, though we observed no difference in dispersal strategies at different sites.

  17. 40 CFR 221.5 - Processing fees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be charged in connection with each application for a permit for dumping in an existing dump site... with each application for a permit for dumping in a dump site other than a dump site designated in this...

  18. 40 CFR 221.5 - Processing fees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be charged in connection with each application for a permit for dumping in an existing dump site... with each application for a permit for dumping in a dump site other than a dump site designated in this...

  19. 10 CFR 2.401 - Notice of hearing on construction permit or combined license applications pursuant to appendix N...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... pursuant to appendix N of part 50 of this chapter for construction permits for nuclear power reactors of... Procedures Applicable to Proceedings for the Issuance of Licenses To Construct and/or Operate Nuclear Power... license applications pursuant to appendix N of 10 CFR parts 50 or 52. 2.401 Section 2.401 Energy NUCLEAR...

  20. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  1. 75 FR 59081 - Approval and Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... Promulgation of Air Quality Implementation Plans; Michigan; PSD Regulations AGENCY: Environmental Protection... the prevention of significant deterioration (PSD) construction permit program under the Federal Clean... potentially subject to the PSD construction permit program. On July 16, 2010, Michigan submitted revisions...

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Faria, Bruna Fernanda de; Moreira, Silvana

    The problem of solid waste in most countries is on the rise as a result of rapid population growth, urbanization, industrial development and changes in consumption habits. Amongst the various forms of waste disposals, landfills are today the most viable for the Brazilian reality, both technically and economically. Proper landfill construction practices allow minimizing the effects of the two main sources of pollution from solid waste: landfill gas and slurry. However, minimizing is not synonymous with eliminating; consequently, the landfill alone cannot resolve all the problems with solid waste disposal. The main goal of this work is to evaluate themore » content of trace elements in samples of groundwater, surface water and slurry arising from local solid waste disposals in the city of Campinas, SP, Brazil. Samples were collected at the Delta, Santa Barbara and Pirelli landfills. At the Delta and Santa Barbara sites, values above the maximum permitted level established by CETESB for Cr, Mn, Fe, Ni and Pb were observed in samples of groundwater, while at the Pirelli site, elements with concentrations above the permitted levels were Mn, Fe, Ba and Pb. At Delta, values above levels permitted by the CONAMA 357 legislation were still observed in surface water samples for Cr, Mn, Fe and Cu, whereas in slurry samples, values above the permitted levels were observed for Cr, Mn, Fe, Ni, Cu, Zn and Pb. Slurry samples were prepared in accordance with two extraction methodologies, EPA 3050B and EPA 200.8. Concentrations of Cr, Ni, Cu and Pb were higher than the limit established by CONAMA 357 for most samples collected at different periods (dry and rainy) and also for the two extraction methodologies employed.« less

  3. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF)more » and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.« less

  4. 30 CFR 933.773 - Requirements for permits and permit processing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...); an approval of dam construction (NCGS 143-215.108), an air pollution control permit (NCGS 143-215.26... in a soil conservation district (NCGS 139-9); and compliance with any county ordinance regarding...

  5. 75 FR 77229 - Federal Requirements Under the Underground Injection Control (UIC) Program for Carbon Dioxide (CO2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ...This action finalizes minimum Federal requirements under the Safe Drinking Water Act (SDWA) for underground injection of carbon dioxide (CO2) for the purpose of geologic sequestration (GS). GS is one of a portfolio of options that could be deployed to reduce CO2 emissions to the atmosphere and help to mitigate climate change. This final rule applies to owners or operators of wells that will be used to inject CO2 into the subsurface for the purpose of long-term storage. It establishes a new class of well, Class VI, and sets minimum technical criteria for the permitting, geologic site characterization, area of review (AoR) and corrective action, financial responsibility, well construction, operation, mechanical integrity testing (MIT), monitoring, well plugging, post-injection site care (PISC), and site closure of Class VI wells for the purposes of protecting underground sources of drinking water (USDWs). The elements of this rulemaking are based on the existing Underground Injection Control (UIC) regulatory framework, with modifications to address the unique nature of CO2 injection for GS. This rule will help ensure consistency in permitting underground injection of CO2 at GS operations across the United States and provide requirements to prevent endangerment of USDWs in anticipation of the eventual use of GS to reduce CO2 emissions to the atmosphere and to mitigate climate change.

  6. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  7. 40 CFR 71.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... existing operating permit issued by a State under the State's approved part 70 program and is applying for... date at least 6 months in advance of the date. Where an existing part 70 or 71 permit would prohibit such construction or change in operation, the source must obtain a permit revision before commencing...

  8. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... bridge permits. 1.01-60 Section 1.01-60 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF... bridge permits. (a) The Commandant delegates to the Deputy Commandant for Operations (CG-DCO), the authority to issue the following permits for the construction, reconstruction, or alteration of bridges...

  9. 76 FR 8395 - Issuance of a Presidential Permit Authorizing the Expansion, Renovation, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Department of State at such time as the construction authorized by this permit is begun, and again at such time as construction is completed, interrupted for more than ninety days or discontinued. Article 11... Administrative Building Entry and Exit Control Booths Roadways and related Infrastructure, Pathways, Parking Lots...

  10. FNF Construction, Inc. Coverage under General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country

    EPA Pesticide Factsheets

    Documents related to the FNF Construction, Inc. Request for Coverage under the General Air Quality Permit for New or Modified Minor Source Hot Mix Asphalt Plants in Indian Country to be Located near Ganado, Arizona on the Navajo Nation.

  11. 77 FR 18923 - Approval and Promulgation of Implementation Plans; New Mexico; Construction Permit Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-29

    ... Environment Department, Air Quality Bureau, 1190 St. Francis Drive, Santa Fe, New Mexico. FOR FURTHER... Promulgation of Implementation Plans; New Mexico; Construction Permit Fees AGENCY: Environmental Protection... (SIP) for New Mexico submitted by the State of New Mexico on April 11, 2002, and April 25, 2005, which...

  12. 77 FR 32493 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... permit program for pre- construction review of certain new and modified major stationary sources in... program as required by section 165 of the CAA for certain new and modified major stationary sources... the CAA requires states to adopt a pre-construction permitting program for certain new and modified...

  13. 76 FR 9809 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit number TE35022A-0, U.S. Fish and... ac of occupied Florida scrub-jay foraging and sheltering habitat incidental to construction of a... construction of a commercial center and the associated infrastructure, and landscaping. The applicant proposes...

  14. 47 CFR 74.112 - Supplementary statement with application for construction permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction permit for any experimental broadcast station confirming the applicant's understanding: (a) That... notice or hearing. (e) That any authorization issued pursuant to the application may be cancelled at any time without notice or hearing, and will expire as a matter of law if the station fails to transmit...

  15. Permit Fees

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  16. Design criteria for a high energy Compton Camera and possible application to targeted cancer therapy

    NASA Astrophysics Data System (ADS)

    Conka Nurdan, T.; Nurdan, K.; Brill, A. B.; Walenta, A. H.

    2015-07-01

    The proposed research focuses on the design criteria for a Compton Camera with high spatial resolution and sensitivity, operating at high gamma energies and its possible application for molecular imaging. This application is mainly on the detection and visualization of the pharmacokinetics of tumor targeting substances specific for particular cancer sites. Expected high resolution (< 0.5 mm) permits monitoring the pharmacokinetics of labeled gene constructs in vivo in small animals with a human tumor xenograft which is one of the first steps in evaluating the potential utility of a candidate gene. The additional benefit of high sensitivity detection will be improved cancer treatment strategies in patients based on the use of specific molecules binding to cancer sites for early detection of tumors and identifying metastasis, monitoring drug delivery and radionuclide therapy for optimum cell killing at the tumor site. This new technology can provide high resolution, high sensitivity imaging of a wide range of gamma energies and will significantly extend the range of radiotracers that can be investigated and used clinically. The small and compact construction of the proposed camera system allows flexible application which will be particularly useful for monitoring residual tumor around the resection site during surgery. It is also envisaged as able to test the performance of new drug/gene-based therapies in vitro and in vivo for tumor targeting efficacy using automatic large scale screening methods.

  17. Wyoming's industrial siting permit process and environmental impact assessment

    NASA Astrophysics Data System (ADS)

    Hyman, Eric L.

    1982-01-01

    The problem of management of industrial residuals can be reduced through a rational system for siting and planning major industrial facilities. In the United States, Wyoming has moved in the direction of establishing a one-stop permitting system that provides important information for air and water quality planning and solid waste management with a minimum of regulatory overlap. This paper describes Wyoming's Industrial Development Information and Siting Act of 1975 and suggests ways in which the Wyoming permitting system can be improved and applied elsewhere.

  18. NOA at the Calaveras Dam Replacement Project (CDRP) - Challenges and Solutions

    NASA Astrophysics Data System (ADS)

    Erskine, B.

    2012-12-01

    The San Francisco Public Utilities Commission is one year into construction of the Calaveras Dam Replacement Project (CDRP), a new earthen dam east of Sunol designed to withstand an M 7.1 earthquake on the nearby active Calaveras fault. The zoned earthen dam will be constructed primarily of on-site materials, many of which contain NOA. The upstream shell will be composed of Franciscan complex blueschist which contains crocidolite. This material will be blasted and processed at an on-site quarry. The impermeable core of the dam will be constructed of clay-rich alluvium that contains asbestos derived from Franciscan rocks. This material will be excavated from the south end of the reservoir and transported several miles to the dam. Currently, approximately 3 million yards of Franciscan complex material is being excavated and disposed of within permitted on-site engineered landfills. NOA-bearing rocks that include serpentinite, greenschist, blueschist, and eclogite contain variable amounts and assemblages of chrysotile, actinolite, crocidolite, tremolite, and winchite-class amphiboles. All of these are detected in air samples collected within a sophisticated air monitoring array and analyzed by TEM. The CDRP represents the largest construction project involving NOA in the country. As such, applying regulations that were designed for building materials and routine construction sites, and controlling airborne emissions on such a massive scale, is a major challenge requiring innovative solutions. Because construction occurs simultaneously at distinct and distant parts of the site, and the rugged topography of the site induces complex meteorological conditions, it is sometimes difficult to ascertain the driving activity and location of a source that caused a trigger level exceedance at a perimeter monitoring station. One helpful tool is forensic correlation of source material and air test data using speciation of amphiboles. At the CDRP, we are developing the ability to correlate rock mineralogy at a location with the species of amphiboles identified on air samples using TEM. Using amphibole species as a fingerprinting tool, we have been successful in determining whether an exceedance of a trigger level was caused from onsite or offsite sources. In one case, multiple exceedances by an unusual mix of chrysotile and amphiboles (crocidolite, actinolite, tremolite, and Libby-class amphiboles in the same sample) narrowed the source to one of two locations: Disposal Site 3 where a mix of materials from the entire site is disposed of, and water recycled in the decontamination zone wheel wash equipment. Using perimeter air monitoring around and between each location it was possible to identify the wheel wash as the source. As a result, the wheel wash system, track out procedures, and road wetting protocol have been re-engineered to eliminate the potential for significant offsite emissions. These and other examples will describe how the SFPUC NOA team is managing the field determination of NOA, on-site control measures, and perimeter air monitoring to assure that construction is conducted in a safe manner and no offsite exposures to the public occur.

  19. Title V Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  20. EPA Issued Operating Permits

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  1. Monitoring Cellular Interactions during T Cell Activation at the Single Molecule Level Using Semiconductor Quantum-Dots

    DTIC Science & Technology

    2005-05-10

    avidin-fusion constructs in mammalian immune cells. To facilitate detection, an epitope tag (HA, derived from the influenza A virus haemagglutinin...Enhanced Green Fluorescent protein (EGFP) cassette. The IRES element (internal ribosome entry site of the encephalomyocarditis virus ) permits both the...AVIDIN CD4 4 AVIDIN tAT .RES’ EGFP TRES’ EGFP IRES’ EGFp 1RES. EGFP g9K LP tar LP gK LP ITTK LIP IE "M33 Ee TM NAMI IAV ~ 𔃺M A ,A,0,, MIMI, A161 TM

  2. 40 CFR 52.681 - Permits to construct and tier II operating permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.681 Permits... Permits issued by the Idaho Department of Environmental Quality in accordance with the Federally-approved State of Idaho Rules for Control of Air Pollution in Idaho, incorporated by reference in section 52.670...

  3. 77 FR 42488 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Panoche Valley Solar...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-19

    ... Water Act to construct and operate a 399-Megawatt AC (MWAC) solar photovoltaic (PV) energy generating... Environmental Impact Statement for the Proposed Panoche Valley Solar Farm in San Benito County, CA, Corps Permit... Department of the Army permit application to construct a solar photovoltaic energy plant in San Benito County...

  4. 75 FR 48408 - Issuance of a Presidential Permit Authorizing the Construction, Operation, and Maintenance of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... of the facilities in the United States. This permit is subject to the following conditions: Article 1... State or the Secretary's delegate. Article 2. The standards for, and the manner of, the construction... performance of their official duties. Article 3. The permittee shall comply with all applicable federal, state...

  5. FNF Construction Inc. Window Rock Airport Project: Coverage Under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country

    EPA Pesticide Factsheets

    Approved Request for Coverage under General Air Quality Permit for New or Modified Minor Source Cement Batch Plants in Indian Country for FNF Construction Inc. Window Rock Airport Soil Cement Mixing Plant Project, Beacon Road, Window Rock, Arizona 86515.

  6. 75 FR 57947 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... auction pace that reasonably balances speed with the bidders' need to study round results and adjust their... and other factors. The Bureaus seek comment on this proposal. Commenters may wish to address the role...

  7. 77 FR 60690 - Auction of FM Broadcast Construction Permits Scheduled for March 26, 2013; Comment Sought on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... technical and marketplace factors that may have a bearing on the value of the construction permits for... balances speed with the bidders' need to study round results and adjust their bidding strategies. The... number of rounds per day, depending upon bidding activity and other factors. The Bureaus seek comment on...

  8. Historical Permit Fee Rates

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements. Historical fee rates.

  9. Special and Research Permits for Ocean Dumping

    EPA Pesticide Factsheets

    Special permits and research permits under the Marine Protection, Research and Sanctuaries Act may be issued by EPA for ocean dumping. Examples and ocean disposal sites for special and research permits are provided.

  10. Large-scale performance and design for construction activity erosion control best management practices.

    PubMed

    Faucette, L B; Scholl, B; Beighley, R E; Governo, J

    2009-01-01

    The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs < 2.5 cm are not recommended on slopes >or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.

  11. Review Team Focused Modeling Analysis of Radial Collector Well Operation on the Hypersaline Groundwater Plume beneath the Turkey Point Site near Homestead, Florida

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oostrom, Martinus; Vail, Lance W.

    Researchers at Pacific Northwest National Laboratory served as members of a U.S. Nuclear Regulatory Commission review team for the Florida Power & Light Company’s application for two combined construction permits and operating licenses (combined licenses or COLs) for two proposed new reactor units—Turkey Point Units 6 and 7. The review team evaluated the environmental impacts of the proposed action based on the October 29, 2014 revision of the COL application, including the Environmental Report, responses to requests for additional information, and supplemental information. As part of this effort, team members tasked with assessing the environmental effects of proposed construction andmore » operation of Units 6 and 7 at the Turkey Point site reviewed two separate modeling studies that analyzed the interaction between surface water and groundwater that would be altered by the operation of radial collector wells (RCWs) at the site. To further confirm their understanding of the groundwater hydrodynamics and to consider whether certain actions, proposed after the two earlier modeling studies were completed, would alter the earlier conclusions documented by the review team in their draft environmental impact statement (EIS; NRC 2015), a third modeling analysis was performed. The third modeling analysis is discussed in this report.« less

  12. Virtual Solar Observatory Distributed Query Construction

    NASA Technical Reports Server (NTRS)

    Gurman, J. B.; Dimitoglou, G.; Bogart, R.; Davey, A.; Hill, F.; Martens, P.

    2003-01-01

    Through a prototype implementation (Tian et al., this meeting) the VSO has already demonstrated the capability of unifying geographically distributed data sources following the Web Services paradigm and utilizing mechanisms such as the Simple Object Access Protocol (SOAP). So far, four participating sites (Stanford, Montana State University, National Solar Observatory and the Solar Data Analysis Center) permit Web-accessible, time-based searches that allow browse access to a number of diverse data sets. Our latest work includes the extension of the simple, time-based queries to include numerous other searchable observation parameters. For VSO users, this extended functionality enables more refined searches. For the VSO, it is a proof of concept that more complex, distributed queries can be effectively constructed and that results from heterogeneous, remote sources can be synthesized and presented to users as a single, virtual data product.

  13. 47 CFR 74.788 - Digital construction period.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...

  14. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Findlay, Rick

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, southmore » of Highway 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  15. Fluid Management Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 1 with ROTC 1 and Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tim Echelard

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) initiated the Offsites Project to characterize the risk posed to human health and the environment as a result of testing at formerly used nuclear sites in Alaska, Colorado, Mississippi, Nevada, and New Mexico. The scope of this Fluid Management Plan (FMP) is to support the subsurface investigation at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447, Shoal-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Spring Range, south of Highwaymore » 50, about 39 miles southeast of Fallon, Nevada. (Figure 1-1). This FMP will be used at the PSA in lieu of an individual discharge permit for each well or a general water pollution control permit for management of all fluids produced during the drilling, construction, development, testing, experimentation, and/or sampling of wells conducted by the Offsites Project. The FMP provides guidance for the management of fluids generated during investigation activities and provides the standards by which fluids may be discharged on site. Although the Nevada Division of Environmental Protection (NDEP), Bureau of Federal Facilities (BoFF) is not a signatory to this FMP, it is involved in the negotiation of the contents of this plan and approves the conditions contained within. The major elements of this FMP include: (1) establishment of a well-site operations strategy; (2) site design/layout; (3) monitoring of contamination indicators (monitoring program); (4) sump characterization (sump sampling program); (5) fluid management decision criteria and fluid disposition; and (6) reporting requirements.« less

  16. 76 FR 40725 - Approval of Outer Continental Shelf (OCS) Permit Issued to Cape Wind Associates, LLC (EPA Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... Cape Wind Associates, LLC (Cape Wind). The OCS permit, which was issued pursuant to regulations, authorizes Cape Wind to construct and operate an offshore renewable wind energy project in federal waters off... Issued to Cape Wind Associates, LLC (EPA Permit Number OCS-R1-01) AGENCY: Environmental Protection Agency...

  17. An examination of the Virginia Department of Transportation's 404 general permit program.

    DOT National Transportation Integrated Search

    1988-01-01

    Several state and federal statutes require that the Virginia Department of Transportation (VDOT) obtain permits for any road construction activity that impacts wetlands and other bodies of water. These "[section] 404 permits" are issued by the u.s. A...

  18. 75 FR 22434 - Exelon Nuclear Texas Holdings, LLC; Notice of Receipt and Availability of Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... for a construction permit (CP) or combined license (COL) for a nuclear power facility. The ESP process...), the permit holder may reference the permit in an application for a CP or COL. Subsequent Federal...

  19. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Wastemore » Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325, Nevada Test Site Waste Acceptance Criteria (NTSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NTS Class III Permit and the NTSWAC.« less

  20. 75 FR 68821 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ...- megawatt (MW), 21-turbine Kaheawa Wind Power I (KWP I) project. Like KWP II, KWP I is owned by First Wind... wind turbine structures. The Hawaiian petrel and Newell's shearwater breed on Maui and feed in the open... the permit include the construction and operation of a new 21-megawatt, 14-turbine wind energy...

  1. 77 FR 16082 - In the Matter of All Power Reactor Licensees and Holders of Construction Permits in Active Or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ...) I The Licensees and construction permit (CP) holders\\1\\ identified in Attachment 1 to this Order... identified in Attachment 1 to this Order (i.e., Watts Bar, Unit 2; and Bellefonte, Units 1 and 2) [[Page... boiled dry, resulting in fuel damage.\\2\\ Fukushima demonstrated the confusion and misapplication of...

  2. NPDES Permit for Arboles Sand & Stone's Lob Lolly Industrial Site in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0048194, Arboles Sand & Stone, LLC is authorized to discharge from its wastewater treatment facility at the Lob Lolly Industrial Site in Archuleta County, Colorado, to the Piedra River.

  3. Effects of land use on water quality and transport of selected constituents in streams in Mecklenburg County, North Carolina, 1994–98

    USGS Publications Warehouse

    Ferrell, Gloria M.

    2001-01-01

    Transport rates for total solids, total nitrogen, total phosphorus, biochemical oxygen demand, chromium, copper, lead, nickel, and zinc during 1994–98 were computed for six stormwater-monitoring sites in Mecklenburg County, North Carolina. These six stormwater-monitoring sites were operated by the Mecklenburg County Department of Environmental Protection, in cooperation with the City of Charlotte, and are located near the mouths of major streams. Constituent transport at the six study sites generally was dominated by nonpoint sources, except for nitrogen and phosphorus at two sites located downstream from the outfalls of major municipal wastewater-treatment plants.To relate land use to constituent transport, regression equations to predict constituent yield were developed by using water-quality data from a previous study of nine stormwater-monitoring sites on small streams in Mecklenburg County. The drainage basins of these nine stormwater sites have relatively homogeneous land-use characteristics compared to the six study sites. Mean annual construction activity, based on building permit files, was estimated for all stormwater-monitoring sites and included as an explanatory variable in the regression equations. These regression equations were used to predict constituent yield for the six study sites. Predicted yields generally were in agreement with computed yields. In addition, yields were predicted by using regression equations derived from a national urban water-quality database. Yields predicted from the regional regression equations generally were about an order of magnitude lower than computed yields.Regression analysis indicated that construction activity was a major contributor to transport of the constituents evaluated in this study except for total nitrogen and biochemical oxygen demand. Transport of total nitrogen and biochemical oxygen demand was dominated by point-source contributions. The two study basins that had the largest amounts of construction activity also had the highest total solids yields (1,300 and 1,500 tons per square mile per year). The highest total phosphorus yields (3.2 and 1.7 tons per square mile per year) attributable to nonpoint sources also occurred in these basins. Concentrations of chromium, copper, lead, nickel, and zinc were positively correlated with total solids concentrations at most of the study sites (Pearson product-moment correlation >0.50). The site having the highest median concentrations of chromium, copper, and nickel also was the site having the highest computed yield for total solids.

  4. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Application. An application for authorization to construct a bridge across navigable waters of...

  5. A Last Glacial Maximum world-ocean simulation at eddy-permitting resolution - Part 1: Experimental design and basic evaluation

    NASA Astrophysics Data System (ADS)

    Ballarotta, M.; Brodeau, L.; Brandefelt, J.; Lundberg, P.; Döös, K.

    2013-01-01

    Most state-of-the-art climate models include a coarsely resolved oceanic component, which has difficulties in capturing detailed dynamics, and therefore eddy-permitting/eddy-resolving simulations have been developed to reproduce the observed World Ocean. In this study, an eddy-permitting numerical experiment is conducted to simulate the global ocean state for a period of the Last Glacial Maximum (LGM, ~ 26 500 to 19 000 yr ago) and to investigate the improvements due to taking into account these higher spatial scales. The ocean general circulation model is forced by a 49-yr sample of LGM atmospheric fields constructed from a quasi-equilibrated climate-model simulation. The initial state and the bottom boundary condition conform to the Paleoclimate Modelling Intercomparison Project (PMIP) recommendations. Before evaluating the model efficiency in representing the paleo-proxy reconstruction of the surface state, the LGM experiment is in this first part of the investigation, compared with a present-day eddy-permitting hindcast simulation as well as with the available PMIP results. It is shown that the LGM eddy-permitting simulation is consistent with the quasi-equilibrated climate-model simulation, but large discrepancies are found with the PMIP model analyses, probably due to the different equilibration states. The strongest meridional gradients of the sea-surface temperature are located near 40° N and S, this due to particularly large North-Atlantic and Southern-Ocean sea-ice covers. These also modify the locations of the convection sites (where deep-water forms) and most of the LGM Conveyor Belt circulation consequently takes place in a thinner layer than today. Despite some discrepancies with other LGM simulations, a glacial state is captured and the eddy-permitting simulation undertaken here yielded a useful set of data for comparisons with paleo-proxy reconstructions.

  6. Modeling for (physical) biologists: an introduction to the rule-based approach

    PubMed Central

    Chylek, Lily A; Harris, Leonard A; Faeder, James R; Hlavacek, William S

    2015-01-01

    Models that capture the chemical kinetics of cellular regulatory networks can be specified in terms of rules for biomolecular interactions. A rule defines a generalized reaction, meaning a reaction that permits multiple reactants, each capable of participating in a characteristic transformation and each possessing certain, specified properties, which may be local, such as the state of a particular site or domain of a protein. In other words, a rule defines a transformation and the properties that reactants must possess to participate in the transformation. A rule also provides a rate law. A rule-based approach to modeling enables consideration of mechanistic details at the level of functional sites of biomolecules and provides a facile and visual means for constructing computational models, which can be analyzed to study how system-level behaviors emerge from component interactions. PMID:26178138

  7. Emergencies and Emergency Permits for Ocean Dumping

    EPA Pesticide Factsheets

    Emergency permits under the MPRSA are issued if disposed material poses a threat to human health. Information is provided on emergency permit examples and disposal sites. Emergencies to safeguard life at sea does not require an ocean dumping permit.

  8. 77 FR 27054 - Notice of Approval of Clean Air Act Outer Continental Shelf Permits Issued to Shell Offshore, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-08

    ... Shelf Permits Issued to Shell Offshore, Inc. for the Kulluk Conical Drilling Unit AGENCY: United States... (OCS) permit to construct and Title V air quality operating permit to Shell Offshore, Inc. (``Shell'') for operation of the Kulluk conical drilling unit in the Beaufort Sea off the north coast of Alaska...

  9. 76 FR 55799 - Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to Avenal Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... Deterioration (PSD) permit application submitted by Avenal Power Center, LLC to authorize construction of the Avenal Energy Project. DATES: The EPA's PSD permit for the Avenal Energy Project became effective and...: The EPA issued a PSD permit on May 27, 2011, to Avenal Power Center, LLC for the Avenal Energy Project...

  10. Using Remote Sensing, Geomorphology, and Soils to Map Episodic Streams in Drylands

    NASA Astrophysics Data System (ADS)

    Thibodeaux-Yost, S. N. S.

    2016-12-01

    Millions of acres of public land in the California deserts are currently being evaluated and permitted for the construction of large-scale renewable energy projects. The absence of a standard method for identifying episodic streams in arid and semi-arid (dryland) regions is a source of conflict between project developers and the government agencies responsible for conserving natural resources and permitting renewable energy projects. There is a need for a consistent, efficient, and cost-effective dryland stream delineation protocol that accurately reflects the extent and distribution of active watercourses. This thesis evaluates the stream delineation method and results used by the developer for the proposed Ridgecrest Solar Power Project on the El Paso Fan, Ridgecrest, Kern County, California. This evaluation is then compared and contrasted with results achieved using remote sensing, geomorphology, soils, and GIS analysis to identify stream presence on the site. This study's results identified 105 acres of watercourse, a value 10 times greater than that originally identified by the project developer. In addition, the applied methods provide an ecohydrologic base map to better inform project siting and potential project impact mitigation opportunities. This study concludes that remote sensing, geomorphology, and dryland soils can be used to accurately and efficiently identify episodic stream activity and the extent of watercourses in dryland environments.

  11. 78 FR 46402 - Issuance of a Presidential Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...: Department of State. ACTION: Notice of Issuance of a Presidential Permit for Vantage Pipeline US LP. SUMMARY: The Department of State issued a Presidential Permit to Vantage Pipeline US LP (``Vantage'') on July 16, 2013, authorizing Vantage to construct, connect, operate, and maintain pipeline facilities at the...

  12. 33 CFR 115.50 - Application for bridge permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Application for bridge permits... BRIDGES BRIDGE LOCATIONS AND CLEARANCES; ADMINISTRATIVE PROCEDURES § 115.50 Application for bridge permits. (a) Approval of plans. An application for authorization to construct a bridge across navigable waters...

  13. An analysis of the accessibility of video lottery terminals: the case of Montréal.

    PubMed

    Robitaille, Eric; Herjean, Patrick

    2008-01-18

    Researchers and public health officials in Canada, the United States and Australia have for some time noted broader geographic accessibility to gambling establishments, above all in socioeconomically underprivileged communities. This increase in availability could lead to more and more gambling problems. This article focuses, in an ecological perspective, in particular on a spatial analysis of the geographic accessibility of sites possessing a VLT permit in the Montréal area, i.e. Montréal Island, the South Shore and Laval, from the standpoint of the development of an indicator of the vulnerability (socioeconomic components and demographic components) to gambling of populations at the level of certain neighbourhood units (dissemination areas). With the recent development of geographic information systems (GIS), it is now possible to ascertain accessibility to services much more accurately, for example by taking into account the configuration of the road network. The findings of our analysis reveal widespread geographic accessibility to sites possessing a VLT permit in the downtown area and in pericentral districts. In some neighbourhood units, a site possessing a VLT permit may be within a three-minute walk. In the region studied overall, average walking time to a VLT site is nine minutes. Access to this type of service on foot is usually limited in the outskirts. However, a number of groups of sites possessing VLT permits are found along certain axial highways. According to local spatial self-correlation analyses, the findings suggest a significant link between walking accessibility to sites possessing VLT permits and the vulnerability of the communities. In a number of neighbourhood units with ready access to VLT's the populations display high vulnerability. These findings reveal that accessibility to sites possessing a VLT permit is often linked to the vulnerability (socioeconomic and demographic components) of communities. Reliance in our analyses on neighbourhood units with fairly small areas enabled us to emphasize the rectilinear dimension of the spatial distribution of sites possessing VLT permits. This is a significant link that public health officials must consider when elaborating programs to combat pathological gambling.

  14. Automated statistical matching of multiple tephra records exemplified using five long maar sequences younger than 75 ka, Auckland, New Zealand

    NASA Astrophysics Data System (ADS)

    Green, Rebecca M.; Bebbington, Mark S.; Cronin, Shane J.; Jones, Geoff

    2014-09-01

    Detailed tephrochronologies are built to underpin probabilistic volcanic hazard forecasting, and to understand the dynamics and history of diverse geomorphic, climatic, soil-forming and environmental processes. Complicating factors include highly variable tephra distribution over time; difficulty in correlating tephras from site to site based on physical and chemical properties; and uncertain age determinations. Multiple sites permit construction of more accurate composite tephra records, but correctly merging individual site records by recognizing common events and site-specific gaps is complex. We present an automated procedure for matching tephra sequences between multiple deposition sites using stochastic local optimization techniques. If individual tephra age determinations are not significantly different between sites, they are matched and a more precise age is assigned. Known stratigraphy and mineralogical or geochemical compositions are used to constrain tephra matches. We apply this method to match tephra records from five long sediment cores (≤ 75 cal ka BP) in Auckland, New Zealand. Sediments at these sites preserve basaltic tephras from local eruptions of the Auckland Volcanic Field as well as distal rhyolitic and andesitic tephras from Okataina, Taupo, Egmont, Tongariro, and Tuhua (Mayor Island) volcanic centers. The new correlated record compiled is statistically more likely than previously published arrangements from this area.

  15. Archaeomagnetic Study of Limeplasters from Pre-hispanic Sites from Central Mexico

    NASA Astrophysics Data System (ADS)

    Hueda, Y. T.; Soler, A. M.; Urrutia-Fucugauchi, J. H.; Rebolledo, M.; Goguitchaichvili, A.; Caballero, C. I.; Tarling, D. H.

    2001-05-01

    In this work, we report the new archeomagnetic data from limeplasters of the archeological sites Teopancazco, Teotihuacan, Xochicalco and Templo Mayor, which correspond to Classical, Epi-Classical and Post-Classical periods of Mesoamerica, respectively. The results obtained allowed us to improve the existing paleosecular variation reference curve for Mesoamerica. The previously reported results, we used for our database belongs to Latham et al., 1986, (stalagmite with a time span from 750 A.D. to 1941 A.D.), and from Urrutia-Fucugauchi, 1996, (historic eruptions). We also incorporated some declination data from explorers and mexican scientists during 1587 to 1869. The observatory data used in this study come from the Teoloyucan magnetic observatory, run by UNAM in central Mexico since 1923. Results of unburned limeplasters permit date the time of elaboration of the limeplasters. Moreover, we were able to discriminate between different construction steps for studied archaeological sites. From the study of burned samples it is possible to date the re-occupation of Teotihuacan culture by the Aztecs.

  16. GIS least-cost analysis approach for siting gas pipeline ROWs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sydelko, P.J.; Wilkey, P.L.

    1994-09-01

    Geographic-information-system applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation corridors, endangered species habitats, wetlands, and public line surveys. A geographic information system was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas-pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentallymore » sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.« less

  17. The Advanced Technology Solar Telescope: design and early construction

    NASA Astrophysics Data System (ADS)

    McMullin, Joseph P.; Rimmele, Thomas R.; Keil, Stephen L.; Warner, Mark; Barden, Samuel; Bulau, Scott; Craig, Simon; Goodrich, Bret; Hansen, Eric; Hegwer, Steve; Hubbard, Robert; McBride, William; Shimko, Steve; Wöger, Friedrich; Ditsler, Jennifer

    2012-09-01

    The National Solar Observatory’s (NSO) Advanced Technology Solar Telescope (ATST) is the first large U.S. solar telescope accessible to the worldwide solar physics community to be constructed in more than 30 years. The 4-meter diameter facility will operate over a broad wavelength range (0.35 to 28 μm ), employing adaptive optics systems to achieve diffraction limited imaging and resolve features approximately 20 km on the Sun; the key observational parameters (collecting area, spatial resolution, spectral coverage, polarization accuracy, low scattered light) enable resolution of the theoretically-predicted, fine-scale magnetic features and their dynamics which modulate the radiative output of the sun and drive the release of magnetic energy from the Sun’s atmosphere in the form of flares and coronal mass ejections. In 2010, the ATST received a significant fraction of its funding for construction. In the subsequent two years, the project has hired staff and opened an office on Maui. A number of large industrial contracts have been placed throughout the world to complete the detailed designs and begin constructing the major telescope subsystems. These contracts have included the site development, AandE designs, mirrors, polishing, optic support assemblies, telescope mount and coudé rotator structures, enclosure, thermal and mechanical systems, and high-level software and controls. In addition, design development work on the instrument suite has undergone significant progress; this has included the completion of preliminary design reviews (PDR) for all five facility instruments. Permitting required for physically starting construction on the mountaintop of Haleakalā, Maui has also progressed. This paper will review the ATST goals and specifications, describe each of the major subsystems under construction, and review the contracts and lessons learned during the contracting and early construction phases. Schedules for site construction, key factory testing of major subsystems, and integration, test and commissioning activities will also be discussed.

  18. 40 CFR 35.925-6 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...

  19. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  20. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  1. 33 CFR 1.01-60 - Delegations for issuance of bridge permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... authority to issue the following permits for the construction, reconstruction, or alteration of bridges... Presidential permit and approval under the International Bridge Act of 1972 (33 U.S.C. 535). (3) Those that... local government agencies. (5) Those authorized by the Commandant upon the appeal of a district...

  2. 40 CFR 35.925-6 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Permits. 35.925-6 Section 35.925-6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.925-6 Permits. That the applicant...

  3. 78 FR 46520 - Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2008-0402; FRL-9834-4] Approval and Promulgation of Air Quality Implementation Plans; Wisconsin; Permit Exemption Rule AGENCY: Environmental.... WDNR submitted revisions exempting certain sources of air pollution from construction permit...

  4. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  5. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  6. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  7. Soil Sample Report in Support of the Site 300 EWTF Ecological Risk Assessment and Permit Renewal-September 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terusaki, Stanley; Gallegos, Gretchen; MacQueen, Donald

    2012-10-02

    LLNL Site 300 has applied to renew the permits for its Explosives Waste Treatment Facility (EWTF), Explosives Waste Storage Facility (EWSF) and Building 883 Storage Facility. As a part of the permit renewal process, the Department of Toxic Substances Control (DTSC) requested LLNL to obtain soil samples in order to conduct a scoping-level ecological risk assessment pursuant to the Department of Toxic Substances Control, Guidance for Ecological Risk Assessment at Hazardous Waste Sites and Permitted Facilities, Part A: Overview, July 4, 1996. As stated in the guidance document, the scoping-level ecological risk assessment provides a framework to determine the potentialmore » interaction ecological receptors and chemicals of concern from hazardous waste treatment operations in the area of EWTF.« less

  8. Molecular modeling study of the differential ligand-receptor interaction at the μ, δ and κ opioid receptors

    NASA Astrophysics Data System (ADS)

    Filizola, Marta; Carteni-Farina, Maria; Perez, Juan J.

    1999-07-01

    3D models of the opioid receptors μ, δ and κ were constructed using BUNDLE, an in-house program to build de novo models of G-protein coupled receptors at the atomic level. Once the three opioid receptors were constructed and before any energy refinement, models were assessed for their compatibility with the results available from point-site mutations carried out on these receptors. In a subsequent step, three selective antagonists to each of three receptors (naltrindole, naltrexone and nor-binaltorphamine) were docked onto each of the three receptors and subsequently energy minimized. The nine resulting complexes were checked for their ability to explain known results of structure-activity studies. Once the models were validated, analysis of the distances between different residues of the receptors and the ligands were computed. This analysis permitted us to identify key residues tentatively involved in direct interaction with the ligand.

  9. Cane Creek flood-flow characteristics at State Route 30 near Spencer, Tennessee

    USGS Publications Warehouse

    Gamble, Charles R.

    1983-01-01

    The Tennessee Department of Transportation has constructed a new bridge and approaches on State Route 30 over Cane Creek near Spencer, Tennessee. The old bridge and its approaches were fairly low, permitting considerable flow over the road during high floods. The new bridge and its approaches are considerably higher, causing different flow conditions at the site. Analysis of the effects of the new bridge, as compared to the old bridge, on floods of the magnitude of the May 27, 1973, flood is presented. The May 27, 1973, flood was greater than a 100-year flood. Analysis of the 50- and 100-year floods for the new bridge are also presented. Results of the study indicate that the new construction will increase the water-surface elevation for a flood equal to the May 27, 1973, flood by approximately 1 foot upstream from bridge. (USGS)

  10. Methodology of environmental diagnosis for construction and demolition waste landfills: a tool for planning and making decisions.

    PubMed

    Garrido, E; Calvo, F; Ramos, A F; Zamorano, M

    2005-11-01

    Current legislation in the European Union regarding landfills provides measures, procedures and guidance to prevent or reduce, insofar as possible, negative effects on the environment. This means that Member States must take measures so that landfills cannot operate unless the operator first presents a plan for the site, which includes the implementation of improvements considered necessary by the engineer for compliance with regulations. Researchers at the University of Granada have developed a method to ascertain the degree of environmental impact that a construction and demolition waste landfill may produce on its immediate surroundings. This methodology is based on environmental indexes; its objective is to give crucial information concerning possible environmental problems produced by a landfill. The data thus obtained will permit the elaboration of guidelines for improvements in the location, design, and operation of landfills, or in extreme cases, their dosing, sealing, and rehabilitation.

  11. 77 FR 64237 - Notice of Approval of Clean Air Act Prevention of Significant Deterioration Permit Issued to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Air Act Prevention of Significant Deterioration (PSD) permit for the City of Palmdale (City) for the construction of the Palmdale Hybrid Power Project (PHPP). DATES: EPA Region 9 issued a final PSD permit... decision can obtain them at http://www.epa.gov/eab/ . A copy of the PSD permit is also available at http...

  12. STATIC AND KINETIC SITE-SPECIFIC PROTEIN-DNA PHOTOCROSSLINKING: ANALYSIS OF BACTERIAL TRANSCRIPTION INITIATION COMPLEXES

    PubMed Central

    Naryshkin, Nikolai; Druzhinin, Sergei; Revyakin, Andrei; Kim, Younggyu; Mekler, Vladimir; Ebright, Richard H.

    2009-01-01

    Static site-specific protein-DNA photocrosslinking permits identification of protein-DNA interactions within multiprotein-DNA complexes. Kinetic site-specific protein-DNA photocrosslinking--involving rapid-quench-flow mixing and pulsed-laser irradiation--permits elucidation of pathways and kinetics of formation of protein-DNA interactions within multiprotein-DNA complexes. We present detailed protocols for application of static and kinetic site-specific protein-DNA photocrosslinking to bacterial transcription initiation complexes. PMID:19378179

  13. Title V Petitions

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  14. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a totalmore » of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.« less

  15. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-10-04

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) ismore » the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is used throughout this document to describe RACM. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the DOE/NV-325, Nevada National Security Site Waste Acceptance Criteria (NNSSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, or contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, or small quantities of LLHB demolition and construction waste and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NNSSWAC.« less

  16. Multi Canister Overpack (MCO) Topical Report [SEC 1 THRU 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LORENZ, B.D.

    In February 1995, the US Department of Energy (DOE) approved the Spent Nuclear Fuel (SNF) Project's ''Path Forward'' recommendation for resolution of the safety and environmental concerns associated with the deteriorating SNF stored in the Hanford Site's K Basins (Hansen 1995). The recommendation included an aggressive series of projects to design, construct, and operate systems and facilitates to permit the safe retrieval, packaging, transport, conditions, and interim storage of the K Basins' SNF. The facilities are the Cold VAcuum Drying Facility (CVDF) in the 100 K Area of the Hanford Site and the Canister Storage building (CSB) in the 200more » East Area. The K Basins' SNF is to be cleaned, repackaged in multi-canister overpacks (MCOs), removed from the K Basins, and transported to the CVDF for initial drying. The MCOs would then be moved to the CSB and weld sealed (Loscoe 1996) for interim storage (about 40 years). One of the major tasks associated with the initial Path Forward activities is the development and maintenance of the safety documentation. In addition to meeting the construction needs for new structures, the safety documentation for each must be generated.« less

  17. Animal population dynamics: Identification of critical components

    USGS Publications Warehouse

    Emlen, J.M.; Pikitch, E.K.

    1989-01-01

    There is a growing interest in the use of population dynamics models in environmental risk assessment and the promulgation of environmental regulatory policies. Unfortunately, because of species and areal differences in the physical and biotic influences on population dynamics, such models must almost inevitably be both complex and species- or site-specific. Given the emormous variety of species and sites of potential concern, this fact presents a problem; it simply is not possible to construct models for all species and circumstances. Therefore, it is useful, before building predictive population models, to discover what input parameters are of critical importance to the desired output. This information should enable the construction of simpler and more generalizable models. As a first step, it is useful to consider population models as composed to two, partly separable classes, one comprising the purely mechanical descriptors of dynamics from given demographic parameter values, and the other describing the modulation of the demographic parameters by environmental factors (changes in physical environment, species interactions, pathogens, xenobiotic chemicals). This division permits sensitivity analyses to be run on the first of these classes, providing guidance for subsequent model simplification. We here apply such a sensitivity analysis to network models of mammalian and avian population dynamics.

  18. 18 CFR 50.11 - General conditions applicable to permits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... applicable to permits. 50.11 Section 50.11 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT APPLICATIONS FOR PERMITS TO SITE INTERSTATE ELECTRIC TRANSMISSION FACILITIES § 50.11 General conditions applicable to permits...

  19. Current Regulations and Regulatory Actions

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  20. 47 CFR 74.788 - Digital construction period.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Digital construction period. 74.788 Section 74... Translator, and TV Booster Stations § 74.788 Digital construction period. (a) Each original construction permit for the construction of a new digital low power television or television translator station shall...

  1. Plant centromere compositions

    DOEpatents

    Mach, Jennifer M [Chicago, IL; Zieler, Helge [Del Mar, CA; Jin, RongGuan [Chesterfield, MO; Keith, Kevin [Three Forks, MT; Copenhaver, Gregory P [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2011-08-02

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  2. Plant centromere compositions

    DOEpatents

    Mach,; Jennifer M. , Zieler; Helge, Jin [Del Mar, CA; RongGuan, Keith [Chesterfield, MO; Kevin, Copenhaver [Three Forks, MT; Gregory P. , Preuss; Daphne, [Chicago, IL

    2011-11-22

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  3. Plant centromere compositions

    DOEpatents

    Keith, Kevin; Copenhaver, Gregory; Preuss, Daphne

    2006-10-10

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  4. Plant centromere compositions

    DOEpatents

    Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, James [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2006-06-26

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  5. Plant centromere compositions

    DOEpatents

    Mach, Jennifer [Chicago, IL; Zieler, Helge [Chicago, IL; Jin, RongGuan [Chicago, IL; Keith, Kevin [Chicago, IL; Copenhaver, Gregory [Chapel Hill, NC; Preuss, Daphne [Chicago, IL

    2007-06-05

    The present invention provides for the nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and minichromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  6. Synthetic Minor NSR Permit: BP America Production Company - Treating Site #8 Central Delivery Point

    EPA Pesticide Factsheets

    This page contains the response to public comments and the final synthetic minor NSR permit for the BP America Production Company, Treating Site #8 Central Delivery Point, located on the Southern Ute Indian Reservation in La Plata County, CO.

  7. Other Agency Actions Related to Title V

    EPA Pesticide Factsheets

    This site will provide basic information on clean air permitting under the title V operating permits program, provide access to state and regional permitting programs, and maintain access to proposed and final regulatory requirements.

  8. Example evaluation of a permit application for a proposed hazardous-waste landfill in eastern Adams County, Colorado

    USGS Publications Warehouse

    Banta, E.R.

    1986-01-01

    A project was undertaken by the U.S. Geological Survey in cooperation with the U. S. Environmental Protection Agency to demonstrate methods by which RCRA (Resources Conservation and Recovery Act of 1976) Part B permit applications might be evaluated. The purpose of the project was to prepare a report that would supplement a series of case studies to be made available to permit writers in the U.S. Environmental Protection Agency. Four sites in the United States were chosen for their potential applicability to geologically similar sites. The Adams County, Colorado, site was chosen to be representative of sites in the Upper Cretaceous Pierre Shale. The intent of this report is to provide an example of how available earth-science information might be used in evaluating an application and not to evaluate the acceptability of the site. Because this study is an evaluation of a permit application, the data used are limited to the data supplied in the application and in published reports. Of the five criteria required by the U.S. Environmental Protection Agency to be addressed in the permit application considered in the case study, the application was evaluated to be inadequate in addressing three criteria: (1) Site characterization, (2) ability to monitor the location, and (3) flow paths and 100-foot time of travel. Details of the inadequacies and a description of the information needed to eliminate the inadequacies are included in the report. (USGS)

  9. 77 FR 28491 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected]gov . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...

  10. 77 FR 34808 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... are exempt from preconstruction permitting requirements under Maryland's New Source Review (NSR.... Email: cox[email protected] . C. Mail: EPA-R03-OAR-2012-0292, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650...

  11. 75 FR 82246 - Action To Ensure Authority To Issue Permits Under the Prevention of Significant Deterioration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... Deterioration (PSD) program to sources of greenhouse gases (GHGs). This action will ensure that a permitting authority--EPA--is available in these states as of January 2, 2011, when PSD becomes applicable to GHG-emitting sources, to issue preconstruction PSD permits and thereby facilitate construction or expansion...

  12. 76 FR 56982 - Approval and Promulgation of Implementation Plans; Texas; Revisions to Permits by Rule and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... Pollution by Permits for New Construction or Modification AGENCY: Environmental Protection Agency (EPA... in Title 30 of the Texas Administrative Code (TAC), Chapter 116--Control of Air Pollution by Permits... [email protected] . List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  13. 33 CFR 321.1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of applications for Department of the Army (DA) permits to authorize the construction of a dike or... require DA permits under section 404 of the Clean Water Act, as amended (33 U.S.C. 1344). Applicants for DA permits under this part should also refer to 33 CFR part 323 to satisfy the requirements of...

  14. Interactions between the cytomegalovirus promoter and the estrogen response element: implications for design of estrogen-responsive reporter plasmids.

    PubMed

    Derecka, K; Wang, C K; Flint, A P F

    2006-07-01

    We aimed to produce an estrogen-responsive reporter plasmid that would permit monitoring of estrogen receptor function in the uterus in vivo. The plasmid pBL-tk-CAT(+)ERE was induced by estrogen in bovine endometrial stromal cells. When the CAT gene was replaced by the secreted alkaline phosphatase SeAP, the resulting construct pBL-tk-SeAP(+)ERE remained estrogen responsive. However when the tk promoter was replaced by the cytomegalovirus (cmv) promoter, the resulting plasmid (pBL-cmv-SeAP(+)ERE) was not estrogen responsive. Inhibition of ERE function was not due to an effect in trans or due to lack of estrogen receptor. It was not due to an interaction between the cmv promoter and the SeAP gene. cmv promoter function was dependent on NF-kappaB, and mutagenesis in the NF-kappaB sites reduced basal reporter expression without imparting responsiveness to estrogen. A mutation in the TATA box also failed to impart estrogen responsiveness. Modeling of DNA accessibility indicated the ERE was inserted at a site accessible to transcription factors. We conclude that the cmv promoter inhibits ERE function in cis when the two sequences are located in the same construct, and that this effect does not involve an interaction between cmv and reporter gene, NF-kappaB sites or the TATA box, or DNA inaccessibility.

  15. 2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mike Lewis

    2013-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

  16. Adding Impacts and Mitigation Measures to OpenEI's RAPID Toolkit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vogel, Erin

    The Open Energy Information platform hosts the Regulatory and Permitting Information Desktop (RAPID) Toolkit to provide renewable energy permitting information on federal and state regulatory processes. One of the RAPID Toolkit's functions is to help streamline the geothermal permitting processes outlined in the National Environmental Policy Act (NEPA). This is particularly important in the geothermal energy sector since each development phase requires separate land analysis to acquire exploration, well field drilling, and power plant construction permits. Using the Environmental Assessment documents included in RAPID's NEPA Database, the RAPID team identified 37 resource categories that a geothermal project may impact. Examplesmore » include impacts to geology and minerals, nearby endangered species, or water quality standards. To provide federal regulators, project developers, consultants, and the public with typical impacts and mitigation measures for geothermal projects, the RAPID team has provided overview webpages of each of these 37 resource categories with a sidebar query to reference related NEPA documents in the NEPA Database. This project is an expansion of a previous project that analyzed the time to complete NEPA environmental review for various geothermal activities. The NEPA review not only focused on geothermal projects within the Bureau of Land Management and U.S. Forest Service managed lands, but also projects funded by the Department of Energy. Timeline barriers found were: extensive public comments and involvement; content overlap in NEPA documents, and discovery of impacted resources such as endangered species or cultural sites.« less

  17. BP America Treating Site #9 Compressor Station... Status of PSD and Title V permits following decommissioning of site

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Policy and Guidance Database available at www2.epa.gov/title-v-operating-permits/title-v-operating-permit-policy-and-guidance-document-index. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  18. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  19. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  20. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  1. 24 CFR 3285.903 - Permits, alterations, and on-site structures.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... live and dead loads, unless the structure, including any attached garage, carport, deck, and porch, is... structures. 3285.903 Section 3285.903 Housing and Urban Development Regulations Relating to Housing and Urban... Manufacturer's Installation Instructions § 3285.903 Permits, alterations, and on-site structures. It is...

  2. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment.

  3. General Permits for Ocean Dumping

    EPA Pesticide Factsheets

    General permits are issued by EPA for the ocean dumping of certain materials that will have a minimal adverse environmental impact and are generally disposed of in small quantities. Information includes examples and ocean disposal sites for general permits

  4. 77 FR 34897 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit to Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ...-0394, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...

  5. 77 FR 28543 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ...-0292, Ms. Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S... preconstruction permitting requirements under Maryland's New Source Review (NSR) program. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final rule...

  6. Synthetic Minor NSR Permit: Arrow Pipeline, LLC - Station #7

    EPA Pesticide Factsheets

    This page contains the administratively revised synthetic minor permit to construct for the Arrow Pipeline, LLC, Station #7, located within the exterior boundaries of the Fort Berthold Indian Reservation in Dunn County, North Dakota.

  7. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  8. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  9. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  10. 43 CFR 3.3 - Permits; to whom granted.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Permits; to whom granted. 3.3 Section 3.3 Public Lands: Interior Office of the Secretary of the Interior PRESERVATION OF AMERICAN ANTIQUITIES § 3.3 Permits; to whom granted. Permits for the examination of ruins, the excavation of archeological sites, and...

  11. 76 FR 59423 - Drakes Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Bay Oyster Company Special-Use Permit, Draft Environmental Impact Statement, Point Reyes National... Drakes Bay Oyster Company Special-use permit in Drakes Estero, Point Reyes National Seashore, California... site, at http://parkplanning.nps.gov/pore (click on the Drakes Bay Oyster Company Special-use permit...

  12. 78 FR 28807 - Endangered and Threatened Species; Take of Anadromous Fish

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... research and enhancement permits. SUMMARY: Notice is hereby given that NMFS has issued Permit 17299 to the... receipt of an application for a scientific research and enhancement permit (17299) was published in the..., and expires on December 31, 2017. Permit 17299 is for research to be conducted at various sites and...

  13. 75 FR 68215 - Direct Final Rule Staying Numeric Limitation for the Construction and Development Point Source...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... required to obtain NPDES permit coverage and performing the following activities: Construction of buildings, including building, developing and general contracting. Heavy and civil 237 engineering construction... Rule Staying Numeric Limitation for the Construction and Development Point Source Category AGENCY...

  14. Environmental Impact Analysis Process. Volume 3. Preliminary Final Environmental Impact Statement Construction and Operation of Space Launch Complex 7

    DTIC Science & Technology

    1989-10-23

    817) 824-5606. Reelfoot Lake Water Level believes that the proposed timber EIS No. 890197. Final, USA. UT, Tooele Management Plan. Implementation...2: Incidenial lake erit The potential need for an incidental take permit is discussed in Section 4.4.1, Regional Environment. Comment No. 3...and Crow Indian Tribes. Yellowstone, E02, Lake Catamount ResortAvailability Big Horn and Rosebud Counties, MT, Construction. Special Use Permit

  15. 77 FR 68197 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ... emergent, scrub-shrub and forested wetlands. Subject to the permit conditions, INDOT is permitted to... emergent, scrub-shrub, and forested wetlands in constructing these 18 crossings. The actions by the Federal...

  16. 40 CFR 60.1705 - What emission limits must I meet? By when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... modification after June 26, 1987, then you must comply with the dioxins/furans and mercury emission limits... construction or operating permit, if a permit modification is required. Final compliance with the dioxins...

  17. 50 CFR 622.225 - Harvest limitations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (a) Aquacultured live rock. In the South Atlantic EEZ: (1) Aquacultured live rock may be harvested only under a permit, as required under § 622.220(a)(3), and aquacultured live rock on a site may be... aquacultured live rock permit for the site. A person harvesting aquacultured live rock is exempt from the...

  18. 50 CFR 622.225 - Harvest limitations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (a) Aquacultured live rock. In the South Atlantic EEZ: (1) Aquacultured live rock may be harvested only under a permit, as required under § 622.220(a)(3), and aquacultured live rock on a site may be... aquacultured live rock permit for the site. A person harvesting aquacultured live rock is exempt from the...

  19. Development and field testing of a Light Aircraft Oil Surveillance System (LAOSS)

    NASA Technical Reports Server (NTRS)

    Burns, W.; Herz, M. J.

    1976-01-01

    An experimental device consisting of a conventional TV camera with a low light level photo image tube and motor driven polarized filter arrangement was constructed to provide a remote means of discriminating the presence of oil on water surfaces. This polarized light filtering system permitted a series of successive, rapid changes between the vertical and horizontal components of reflected polarized skylight and caused the oil based substances to be more easily observed and identified as a flashing image against a relatively static water surface background. This instrument was flight tested, and the results, with targets of opportunity and more systematic test site data, indicate the potential usefulness of this airborne remote sensing instrument.

  20. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  1. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  2. 43 CFR 2920.9-1 - Construction phase.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Construction phase. 2920.9-1 Section 2920..., Permits and Easements: General Provisions § 2920.9-1 Construction phase. (a) Unless otherwise stated in the land use authorization, construction may proceed immediately upon receipt and acceptance of the...

  3. Lift-Shape Construction, An EFL Project Report.

    ERIC Educational Resources Information Center

    Evans, Ben H.

    Research development of a construction system is detailed in terms of--(1) design and analysis, (2) construction methods, (3) testing, (4) cost analysis, and (5) architectural potentials. The system described permits construction of usual shapes without the use of conventional concrete formwork. The concrete involves development of a structural…

  4. Characteristics of visitors without permits compared to those with permits at the Desolation Wilderness, California

    Treesearch

    Alan E. Watson

    1993-01-01

    At the Desolation Wilderness a sample of visitors without the required use permit were asked to complete a short survey to allow them to be compared with visitors who had gotten permits. Previous research suggested that those without permits would be less experienced at the site, and be more likely to be anglers, on shorter visits, younger, in smaller groups, or with...

  5. Evaluation of Streamflow, Water Quality, and Permitted and Nonpermitted Loads and Yields in the Raritan River Basin, New Jersey, Water Years 1991-98

    USGS Publications Warehouse

    Reiser, Robert G.

    2003-01-01

    Seventeen water-quality constituents were analyzed in samples collected from 21 surface-water sampling sites in the Raritan River Basin during water years 1991-97. Loads were computed for seven constituents. Thirteen constituents have associated instream water-quality standards that are used as reference levels when evaluating the data. Nine of the 13 constituents did not meet water-quality reference levels in all samples at all sites. The constituents that most commonly failed to meet the water-quality reference levels in the 801 samples analyzed were total phosphorus (greater than 0.1 mg/L (milligrams per liter) in 32 percent of samples), fecal coliform bacteria (greater than 400 counts/100 milliliters in 29 percent), hardness (less than 50 mg/L in 21 percent), pH (greater than 8.5 or less than 6.5 in 17 percent), and water temperature in designated trout waters (greater than 20 degrees Celsius in 12 percent of samples). Concentrations of chloride, total dissolved solids, nitrate plus nitrite, and sulfate did not exceed water-quality reference levels in any sample. Results from previous studies on pesticides and volatile organic compounds in streamwater during 1996-98, and organic compounds and trace elements in sediments during 1976-93, were summarized for this study. Concentrations of pesticides in some samples exceeded the relevant standards. Water-quality data varied significantly as season and streamflow changed. Concentrations or values of 12 constituents were significantly higher in the growing season than in the nongrowing season at 1 to 21 sites, and concentrations of 6 constituents were significantly higher in the nongrowing season at 1 to 21 sites. Concentrations or values of seven constituents decreased significantly with increased streamflow, indicating a more significant contribution from base flow or permitted sources than from runoff. Concentrations or values of four constituents increased with increased flow, indicating a more significant contribution from runoff than from base flow or permitted sources. Phosphorus concentrations increased with flow at two sites with no point sources and decreased with flow at five sites with four or more permitted point sources. Concentrations of five constituents did not vary significantly with changes in streamflow at any of the sites. Concentrations of constituents differed significantly between sites. The sites with the most desirable values for the most constituents were Mulhockaway Creek, Spruce Run, Millstone River at Manalapan, Manalapan Brook, and Lamington River at Pottersville. The sites with the least desirable values for the most constituents were Millstone River at Blackwells Mills, Matchaponix Brook, Raritan River at Bound Brook, Neshanic River, and Millstone River at Grovers Mill. The total instream loads of seven constituents - total ammonia plus organic nitrogen (TKN), biochemical oxygen demand (BOD), total dissolved solids (TDS), nitrate plus nitrite (NO3+NO2), total organic carbon (TOC), total phosphorus, and total suspended solids (TSS) - were analyzed at low, median, and high flows. The quantities of total instream load that originated from facilities with permits issued by the New Jersey Department of Environmental Protection to discharge effluent to streams (permitted sources) and from other sources (nonpermitted sources) were estimated for each sampling site. TOC and TSS loads primarily were contributed by nonpermitted sources at all flows. BOD and TDS loads primarily were contributed by nonpermitted sources at median and high flows. At low flow, permitted sources contributed more than one-third of the TDS load at 10 sites and more than one-third of the BOD load at 3 sites. Permitted sources contributed more than one-third of the total phosphorus load at 15 and 14 sites at low and median flows, respectively. Permitted sources accounted for more than one-third of total instream load of NO3+NO2 at low- and median-flow conditions at nearly

  6. Documents related to Proposed Class II injection well permit modification MI-147-2D-0014

    EPA Pesticide Factsheets

    Public notice for proposed modification of permit number MI-147-2D-0014 (St. Clair County, MI). The proposed modification would change the injection zone, the construction, and reduce the injection pressure.

  7. 77 FR 12286 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Heavy and Civil Engineering 237 Construction. EPA does not intend the preceding table to be exhaustive... challenged later in civil or criminal proceedings to enforce these requirements. In addition, this permit may...

  8. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  9. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  10. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  11. Development of uniform standards for allowable lane closure : final report, September 2008.

    DOT National Transportation Integrated Search

    2008-09-01

    Procedures for determining allowable lane closure hours to perform maintenance, construction, resurfacing, regional permit and major access permit work on the state highway system were evaluated. The current process involves the collection of traffic...

  12. NPDES Permit for Denver Federal Center Building 52A in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0034860, the GSA is authorized to discharge wastewater from construction dewatering activities at Denver Federal Center Building 52A in Lakewood, Colo., to to the storm drain system entering McIntyre Gulch.

  13. 77 FR 43349 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    .... mail: David L. Hankla, Field Supervisor, Jacksonville Ecological Services Field Office, Attn: Permit... habitat incidental to construction of an expansion to an existing water plant facility. The 6.5-ac project...

  14. 23 CFR 750.106 - Class 3 and 4 signs within informational sites.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... area, and nothing on such sign may be permitted to be legible from any place on the main-traveled way or a turning roadway. (4) Not more than one sign concerning a single activity or place may be permitted within any one informational site. (5) Signs concerning a single activity or place may be...

  15. 23 CFR 750.106 - Class 3 and 4 signs within informational sites.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... area, and nothing on such sign may be permitted to be legible from any place on the main-traveled way or a turning roadway. (4) Not more than one sign concerning a single activity or place may be permitted within any one informational site. (5) Signs concerning a single activity or place may be...

  16. 2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael G. Lewis

    2012-02-01

    This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Areamore » Sewage Treatment plant.« less

  17. 76 FR 12693 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ....S. Census Bureau. Title: Survey of Construction--Questionnaire for Building Permit Official. OMB... Construction (SOC). Government agencies and private companies use statistics from SOC to monitor and evaluate the large and dynamic housing construction industry. The SOC-QBPO is an electronic questionnaire...

  18. 78 FR 23327 - Issuance of a Presidential Permit Authorizing the State of Michigan to Construct, Connect...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-18

    ...) The construction, operation and maintenance of the United States facilities shall be in all material... ``Application''). Article 2. (1) The standards for, and the manner of, the construction, operation, and... performance of their official duties. (2) Prior to initiation of construction, the permittee shall obtain the...

  19. 30 CFR 780.38 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  20. 30 CFR 784.30 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  1. Wind Powering America State Outreach. Final Technical Report: Washington State

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stearns, Tim

    2013-09-30

    The Washington Department of Commerce, via a U.S. Department of Energy grant, supported research into siting and permitting processes for wind projects by Skagit County, Washington. The goal was to help a local government understand key issues, consider how other areas have addressed wind siting, and establish a basis for enacting permitting and zoning ordinances that provided a more predictable permitting path and process for landowners, citizens, government and developers of small and community wind projects. The County?s contractor developed a report that looked at various approaches to wind siting, interviewed stakeholders, and examined technology options. The contractor outlined keymore » issues and recommended the adoption of a siting process. The Skagit County Commission considered the report and directed the Skagit County Planning & Development Services Department to add development of wind guidelines to its work plan for potential changes to development codes.« less

  2. Archaeological Geophysics, Excavation, and Ethnographic Approaches Toward a Deeper Understanding of an Eighteenth Century Wichita Site

    NASA Astrophysics Data System (ADS)

    Carlock, Michael Don

    This research exemplifies a multidirectional approach to an archaeological interpretation of an eighteenth century Wichita village and fortification located on the Red River bordering Oklahoma and Texas. A battle that is believed to have occurred at the Longest site (34JF1) in 1759 between Spanish colonials and a confederation of Native Americans led to several Spanish primary documents describing the people that lived there, the fortification and surrounding village, and of course the battle itself. Investigation of the Longest site (34JF1) in Oklahoma presents a remarkable opportunity to combine extensive historical research, archaeological prospecting using geophysics, and traditional excavation techniques in order to gain a more complete understanding of this important archaeological site. The fortification at the Longest site, as well as possible associated structures and cultural features, were relocated using magnetometry, ground-penetrating radar, and electrical resistivity methods. Then, previously translated historical documents provided valuable insights in the interpretation of the geophysical data. Finally, archaeological excavation permitted validation of the interpretations and identification of features described in the historical accounts. As interpreted in the geophysical data and excavations, the construction of the fortification and associated interior subterranean rooms suggests that it is indeed the fortification involved in the altercation between the Taovayas and the Spanish in 1759.

  3. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  4. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  5. 40 CFR 35.408 - Award limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management of a substantial portion of the State's construction grants program. The maximum amount of permit... Regional Administrator allows for full funding of the management of the construction grant program under... Award limitations. The Regional Administrator will not award section 205(g) funds: (a) For construction...

  6. 2011 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David Frederick

    2012-02-01

    This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA-000160-01), for the wastewater reuse site at the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond from November 1, 2010 through October 31, 2011. The report contains the following information: (1) Facility and system description; (2) Permit required effluent monitoring data and loading rates; (3) Groundwater monitoring data; (4) Status of special compliance conditions; and (5) Discussion of the facility's environmental impacts. During the 2011 reporting year, an estimated 6.99 million gallons of wastewater were discharged to themore » Industrial Waste Ditch and Pond which is well below the permit limit of 13 million gallons per year. Using the dissolved iron data, the concentrations of all permit-required analytes in the samples from the down gradient monitoring wells were below the Ground Water Quality Rule Primary and Secondary Constituent Standards.« less

  7. City and County Solar PV Training Program, Module 3: Detailed Site Evaluation, Project Validation, and Permitting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Day, Megan H; Lisell, Lars J

    This is the third of five training modules recorded for the City and County Solar PV Training Program. The program is focused on training local government staff in the PV procurement process. This module focuses on siting and permitting for both rooftop and larger, ground-mounted systems rand includes a link to a video.

  8. First report on the Oak Ridge K-25 Site Biological Monitoring and Abatement Program for Mitchell Branch

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, J.G.; Adams, S.M.; Kszos, L.A.

    1993-08-01

    A modified National Pollutant Discharge Elimination System permit was issued to the Oak Ridge Gaseous Diffusion Plant (now referred to as the Oak Ridge K-25 Site) on September 11, 1986. The Oak Ridge K-25 Site is a former uranium-enrichment production facility, which is currently managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy. As required in Part III (L) of that permit, a plan for the biological monitoring of Mitchell Branch (K-1700 stream) was prepared and submitted for approval to the US Environmental Protection Agency and the Tennessee Department of Environment and Conservation [formerly the Tennesseemore » Department of Health and Environment (Loar et al. 1992b)]. The K-25 Site Biological Monitoring and Abatement Program (BMAP) described biomonitoring activities that would be conducted over the duration of the permit. Because it was anticipated that the composition of existing effluent streams entering Mitchell Branch would be altered shortly after the modified permit was issued, sampling of the benthic invertebrate and fish communities (Task 4 of BMAP) was initiated in August and September 1986 respectively.« less

  9. 40 CFR 264.555 - Disposal of CAMU-eligible wastes in permitted hazardous waste landfills.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permitted hazardous waste landfills. 264.555 Section 264.555 Protection of Environment ENVIRONMENTAL...-eligible wastes in permitted hazardous waste landfills. (a) The Regional Administrator with regulatory... hazardous waste landfills not located at the site from which the waste originated, without the wastes...

  10. 50 CFR 622.70 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... such fish or other marine organisms are possessed, through landing ashore. (2) Aquacultured live rock. For a person to take or possess aquacultured live rock in the Gulf EEZ, a Federal aquacultured live rock permit must have been issued for the specific harvest site. Such permit, or a copy, must be on...

  11. 50 CFR 622.70 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... such fish or other marine organisms are possessed, through landing ashore. (2) Aquacultured live rock. For a person to take or possess aquacultured live rock in the Gulf EEZ, a Federal aquacultured live rock permit must have been issued for the specific harvest site. Such permit, or a copy, must be on...

  12. Minor New Source Review Permit Application: Fluidic, Inc.

    EPA Pesticide Factsheets

    Federal Minor New Source Review New Construction Application for proposed construction of new equipment at an existing source at Fluidic's facility located at 8425 N. 9th Street, Suite #4, Scottsdale, Arizona 48258.

  13. 33 CFR 114.05 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (h) Permit. The term “permit” means the license permitting construction of bridges and approaches... subchapter. (i) Secretary. The term “Secretary” means the Secretary of Homeland Security or any person to... term “bridge” means a structure erected across navigable waters of the United States, and includes...

  14. 75 FR 33653 - Exelon Nuclear Texas Holdings, LLC (Exelon) Acceptance for Docketing of an Application for an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-14

    ... of 10 CFR Part 52 separate from the filing of an application for a construction permit (CP) or... reference the permit in a CP or COL application. The NRC staff has determined that Exelon has submitted...

  15. Construction Activities Prior to Issuance of a PSD Permit with Respect to Begin Actual Construction

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  16. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  17. 30 CFR 36.23 - Engine intake system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Engine intake system. 36.23 Section 36.23... EQUIPMENT Construction and Design Requirements § 36.23 Engine intake system. (a) Construction. The intake... operator's compartment, to shut off the air supply to the engine. This valve shall be constructed to permit...

  18. 36 CFR 223.38 - Standards for road design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Standards for road design and... PRODUCTS Timber Sale Contracts Contract Conditions and Provisions § 223.38 Standards for road design and construction. Road construction authorized under timber sale contracts, permits and other documents authorizing...

  19. Use of geographic information systems for applications on gas pipeline rights-of-way

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sydelko, P.J.; Wilkey, P.L.

    1992-12-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentallymore » sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.« less

  20. Use of geographic information systems for applications on gas pipeline rights-of-way

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sydelko, P.J.

    1993-10-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentallymore » sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for land use/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.« less

  1. Use of geographic information systems for applications on gas pipeline rights-of-way

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sydelko, P.J.; Wilkey, P.L.

    1992-01-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way (ROWS) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1) determination of environmentallymore » sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWS; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.« less

  2. Effects of aircraft overflights on wilderness recreationists.

    PubMed

    Fidell, S; Silvati, L; Howe, R; Pearsons, K S; Tabachnick, B; Knopf, R C; Gramann, J; Buchanan, T

    1996-11-01

    On-site and telephone opinion surveys were conducted to assess outdoor recreationists' annoyance with aircraft overflights of wilderness areas. Although current technology for measuring noise exposure does not yet permit accurate and cost-effective estimates of dosage-response relationships in outdoor recreational settings, it was nonetheless possible to construct a rough relationship between estimated aircraft noise exposure and annoyance from the data of the on-site study. In the second survey, telephone interviews were administered to another sample of outdoor recreationists within 2 weeks of their return from visits to 12 wilderness areas. The prevalence of aircraft noise-induced annoyance (in any degree) among respondents in all wilderness areas ranged from 5% to 32%. The prevalence of a consequential degree of aircraft noise-induced annoyance among respondents was less than 5% in all wilderness areas combined. Noise-induced annoyance proved to be a more direct measure of the effects of aircraft overflights on recreationists than more global measures such as visit satisfaction or intent to revisit.

  3. 40 CFR 70.5 - Permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  4. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  5. 36 CFR 223.37 - Revegetation of temporary roads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... roads. 223.37 Section 223.37 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... Provisions § 223.37 Revegetation of temporary roads. Timber sale contracts, permits and other documents... roads constructed or used thereunder so as to permit the reestablishment by artificial or natural means...

  6. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strachan, C.L.; Raabe, K.L.

    1997-12-31

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designedmore » for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment.« less

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bhatt, Arpit; Zhang, Yimin; Davis, Ryan

    The implementation of the US Renewable Fuel Standard is expected to increase the construction and operation of new biofuel facilities. Allowing this industry to grow without adversely affecting air quality is an important sustainability goal sought by multiple stakeholders. However, little is known about how the emission controls potentially required to comply with air quality regulations might impact biorefinery cost and deployment strategies such as siting and sizing. In this study, we use a baseline design for a lignocellulosic hydrocarbon biofuel production process to assess how the integration of emission controls impacts the minimum fuel selling price (MFSP) of themore » biofuel produced. We evaluate the change in MFSP for two cases as compared to the baseline design by incorporating (i) emission controls that ensure compliance with applicable federal air regulations and (ii) advanced control options that could be used to achieve potential best available control technology (BACT) emission limits. Our results indicate that compliance with federal air regulations can be achieved with minimal impact on biofuel cost (~$0.02 per gasoline gallon equivalent (GGE) higher than the baseline price of $5.10 GGE -1). However, if air emissions must be further reduced to meet potential BACT emission limits, the cost could increase nontrivially. For example, the MFSP could increase to $5.50 GGE -1 by adopting advanced emission controls to meet potential boiler BACT limits. Finally, given tradeoffs among emission control costs, permitting requirements, and economies of scale, these results could help inform decisions about biorefinery siting and sizing and mitigate risks associated with air permitting.« less

  8. 40 CFR 220.3 - Categories of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Marine Pollution by Dumping of Wastes and Other Matter that are likely to be affected by the dumping...) Permits for incineration at sea. Permits for incineration of wastes at sea will be issued only as research... where studies on the waste, the incineration method and vessel, and the site have been conducted and the...

  9. 77 FR 28897 - Notice of Lodging of Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ...'s violation of the National Pollution Discharge Elimination System Permit (``NPDES Permit'') for its... its wastewater treatment system that will enable it to comply with the permit, which include upgrading... Department of Justice Web site: http://www.usdoj.gov/enrd/Consent_Decrees.html . A copy of the Consent Decree...

  10. 40 CFR 434.72 - Effluent limitations attainable by the application of the best practicable control technology...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... currently available (BPT). (a) The operator must submit a site-specific Pollution Abatement Plan to the permitting authority for the pollution abatement area. The plan must be approved by the permitting authority and incorporated into the permit as an effluent limitation. The Pollution Abatement Plan must identify...

  11. Relative Evaluation of the Independent Volume Measures of Caverns

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MUNSON,DARRELL E.

    2000-08-01

    Throughout the construction and operation of the caverns of the Strategic Petroleum Reserve (SPR), three types of cavern volume measurements have been maintained. These are: (1) the calculated solution volume determined during initial construction by solution mining and any subsequent solutioning during oil transfers, (2) the calculated sonar volume determined through sonar surveys of the cavern dimensions, and (3) the direct metering of oil to determine the volume of the cavern occupied by the oil. The objective of this study is to compare these measurements to each other and determine, if possible, the uncertainties associated with a given type ofmore » measurement. Over time, each type of measurement has acquired a customary, or an industry accepted, stated uncertainty. This uncertainty is not necessarily the result of a technical analysis. Ultimately there is one definitive quantity, the oil volume measure by the oil custody transfer meters, taken by all parties to the transfer as the correct ledger amount and for which the SPR Project is accountable. However, subsequent transfers within a site may not be with meters of the same accuracy. In this study, a very simple theory of the perfect relationship is used to evaluate the correlation (deviation) of the various measures. This theory permits separation of uncertainty and bias. Each of the four SPR sites are examined, first with comparisons between the calculated solution volumes and the sonar volumes determined during construction, then with comparisons of the oil inventories and the sonar volumes obtained either by surveying through brine prior to oil filling or through the oil directly.« less

  12. 29 CFR 1926.152 - Flammable and combustible liquids.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...

  13. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  14. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  15. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  16. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  17. 75 FR 4839 - Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ...] Endangered and Threatened Wildlife and Plants; Permit, St. Lucie County, FL AGENCY: Fish and Wildlife Service...-jay) breeding, feeding, and sheltering habitat incidental to lot preparation for the construction of a...)) of Florida scrub-jay breeding, feeding and sheltering habitat incidental to land preparation for...

  18. 75 FR 69990 - Application for Presidential Permit; Northern Pass Transmission LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... constructed in Franklin, New Hampshire. At the Franklin converter terminal the electric energy would be... marketplace, DOE has consistently expressed its policy that cross-border trade in electric energy should be... DEPARTMENT OF ENERGY [OE Docket No. PP-371] Application for Presidential Permit; Northern Pass...

  19. 29 CFR 1926.152 - Flammable and combustible liquids.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... access way to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner... to permit approach of fire control apparatus. (5) Storage areas shall be kept free of weeds, debris... wooden storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides...

  20. Long-term Stabilization of Disturbed Slopes Resulting from Construction Operations

    DOT National Transportation Integrated Search

    2018-01-01

    Highway construction disturbs soil, which must be stabilized to prevent migration of soil particles into water bodies. Stabilization is enforced by law, regulation, and a permit system. Stabilization is most efficiently attained by reestablishment of...

  1. Settlement Yields Protection for Deerfield River from Highway Project Runoff

    EPA Pesticide Factsheets

    Both parties involved in a road and bridge construction project in Deerfield, Mass. have agreed to pay a total penalty of $21,600 to resolve claims by EPA that they violated their construction permit...

  2. State Waste Discharge Permit Application: Electric resistance tomography testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the arealmore » extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.« less

  3. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations... all of their base stations or fixed stations. [69 FR 75172, Dec. 15, 2004] ... constructed stations. (d) EA and Regional licensees will not be permitted to count the resale of the services...

  4. 75 FR 20653 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed TransCanada...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... Presidential permit for the construction, operation, and maintenance of pipeline facilities at the border of... referred to in Executive Order 13337, as amended, for the construction, connection, operation, or... environmental effects of the construction and operation of the United States portion of the Keystone XL Pipeline...

  5. Constructing temporary sampling platforms for hydrologic studies

    Treesearch

    Manuel H. Martinez; Sandra E. Ryan

    2000-01-01

    This paper presents instructions for constructing platforms that span the width of stream channels to accommodate the measurement of hydrologic parameters over a wide range of discharges. The platforms provide a stable, safe, noninvasive, easily constructed, and relatively inexpensive means for permitting data collection without wading in the flow. We have used the...

  6. 78 FR 8448 - Streamlining Inspection and Warranty Requirements for Federal Housing Administration (FHA) Single...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... jurisdiction did not already perform its own inspections for new construction, and issue building permits and... expected to be minimal. The increased quality of construction materials and the standardization of building... governments that have adopted building codes to regulate and standardize the construction of residential and...

  7. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...

  8. 40 CFR 265.19 - Construction quality assurance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conductivity requirements must be verified by using in-situ testing on the constructed test fill. The test fill... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... applicable units, and a description of how they will be constructed. (2) Identification of key personnel in...

  9. NPDES Permit for Wesco Operating, Inc., Lander Field in Wyoming

    EPA Pesticide Factsheets

    Indian Country, Minor, indust., non-discharge, permit WY-0000221 Wesco Operating, Inc., is directed to have no discharge from the Lander Field NW Discharge oil production site in Fremont County, Wyoming.

  10. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less

  11. Informatics in radiology (infoRAD): HTML and Web site design for the radiologist: a primer.

    PubMed

    Ryan, Anthony G; Louis, Luck J; Yee, William C

    2005-01-01

    A Web site has enormous potential as a medium for the radiologist to store, present, and share information in the form of text, images, and video clips. With a modest amount of tutoring and effort, designing a site can be as painless as preparing a Microsoft PowerPoint presentation. The site can then be used as a hub for the development of further offshoots (eg, Web-based tutorials, storage for a teaching library, publication of information about one's practice, and information gathering from a wide variety of sources). By learning the basics of hypertext markup language (HTML), the reader will be able to produce a simple and effective Web page that permits display of text, images, and multimedia files. The process of constructing a Web page can be divided into five steps: (a) creating a basic template with formatted text, (b) adding color, (c) importing images and multimedia files, (d) creating hyperlinks, and (e) uploading one's page to the Internet. This Web page may be used as the basis for a Web-based tutorial comprising text documents and image files already in one's possession. Finally, there are many commercially available packages for Web page design that require no knowledge of HTML.

  12. 25 CFR 247.16 - What fire is permitted?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What fire is permitted? 247.16 Section 247.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE USE OF COLUMBIA RIVER TREATY FISHING ACCESS SITES § 247.16 What fire is permitted? (a) You may have a fire in designated fire places...

  13. 25 CFR 247.16 - What fire is permitted?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What fire is permitted? 247.16 Section 247.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE USE OF COLUMBIA RIVER TREATY FISHING ACCESS SITES § 247.16 What fire is permitted? (a) You may have a fire in designated fire places...

  14. The anatomy of the musculocutaneous latissimus dorsi flap for neophalloplasty.

    PubMed

    Dennis, M; Granger, A; Ortiz, A; Terrell, M; Loukos, M; Schober, J

    2018-03-01

    In transgender surgery, the ideal neophallus is one that: (a) is constructed using a reproducible procedure, (b) possesses tactile and erogenous sensation, (c) is large and rigid enough (naturally, or using a prosthesis) to permit penetrative intercourse, (d) leaves acceptable donor site morbidity, (e) results in esthetically satisfactory appearance, and (f) allows for voiding while standing. The musculocutaneous latissimus dorsi (MLD) flap has favorable results in the area of neophalloplasty. Among its advantages are acceptable donor site appearance, stiffness sufficient for intercourse, and esthetically satisfactory genital appearance. The anatomy of the MLD flap supports the creation of a neophallus for transsexual anatomy revision. Herein, we give an overview of the advantages and disadvantages of the procedure, and the anatomical details and surgical steps involved. Novel illustrations were created from standard surgical text descriptions to clarify this topic for surgical training and patient understanding and decision making. A review of the relevant literature regarding the anatomy, procedure development, and outcomes is presented. The MLD flap uses part of the latissimus dorsi muscle with branches of the thoracodorsal vessels and nerve to construct a neophallus. A thin strip of muscle around the pedicle is harvested, resulting in a slightly curvilinear scar. The blood supply is connected to the femoral artery and saphenous vein or the deep inferior epigastric artery and vein, while the nerve is connected to the ilioinguinal nerve or the obturator nerve. The MLD flap for neophalloplasty is a reliable graft with a well concealed scar and low donor site morbidity. Clin. Anat. 31:152-159, 2018. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  15. United States housing, first quarter 2013

    Treesearch

    Delton Alderman

    2014-01-01

    Provides current and historical information on housing market in the United States. Information includes trends for housing permits and starts, housing under construction, and housing completions for single and multifamily units, and sales and construction. This report will be updated regularly.

  16. Complex assessment of urban housing energy sustainability

    NASA Astrophysics Data System (ADS)

    Popova, Olga; Glebova, Julia; Karakozova, Irina

    2018-03-01

    The article presents the results of a complex experimental-analytical research of residential development energy parameters - survey of construction sites and determination of calculated energy parameters (resistance to heat transfer) considering their technical condition. The authors suggest a methodology for assessing residential development energy parameters on the basis of construction project's structural analysis with the use of advanced intelligent collection systems, processing (self-organizing maps - SOM) and data visualization (geo-informational systems - GIS). SOM clustering permitted to divide the housing stock (on the example of Arkhangelsk city) into groups with similar technical-operational and energy parameters. It is also possible to measure energy parameters of construction project of each cluster by comparing them with reference (normative) measures and also with each other. The authors propose mechanisms for increasing the area's energy stability level by implementing a set of reproduction activities for residential development of various groups. The analysis showed that modern multilevel and high-rise construction buildings have the least heat losses. At present, however, ow-rise wood buildings is the dominant styles of buildings of Arkhangelsk city. Data visualisation on the created heat map showed that such housing stock covers the largest urban area. The development strategies for depressed areas is in a high-rise building, which show the economic, social and environmental benefits of upward growth of the city. An urban regeneration programme for severely rundown urban housing estates is in a high-rise construction building, which show the economic, social and environmental benefits of upward growth of the city.

  17. Wesco Operating Inc., Lander Field NPDES Proposed Permit

    EPA Pesticide Factsheets

    Indian Country, Minor, indust., non-discharge, proposed permit WY-0000221 establishes monitoring and reporting provisions should an unauthorized release of produced water occur from the Wesco Operating, Inc., Lander Field NW Discharge oil production site.

  18. Application of Earth Resources Technology Satellite data to urban development and regional planning: Test site, County of Los Angeles

    NASA Technical Reports Server (NTRS)

    Raje, S. (Principal Investigator); Economy, R.; Mcknight, J. S.; Garofalo, P.

    1973-01-01

    The author has identified the following significant results. Signigicant results have been obtained from the analyses of ERTS-1 imagery from five cycles over Test Site SR 124 by classical photointerpretation and by an interactive hybrid multispectral information extraction system (GEMS). Photointerpretation has produced over 25 overlays at 1:1,000,000 scale depicting regional relations and urban structure in terms of several hundred linear and areal features. A possible new fault lineament has been discovered on the northern slope of the Santa Monica mountains. GEMS analysis of the ERTS-1 products has provided new or improved information in the following planning data categories: urban vegetation; land cover segregation; manmade and natural impact monitoring; urban design; land suitability. ERTS-1 data analysis has allowed planners to establish trends that directly impact planning policies. For example, detectable grading and new construction sites quantitatively indicated the extent, direction, and rate of urban expansion which enable planners to forecast demand and growth patterns on a regional scale. This new source of information will not only assist current methods to be more efficient, but permits entirely new planning methodologies to be employed.

  19. Does Disposing of Construction and Demolition Debris in Unlined Landfills Impact Groundwater Quality? Evidence from 91 Landfill Sites in Florida.

    PubMed

    Powell, Jon T; Jain, Pradeep; Smith, Justin; Townsend, Timothy G; Tolaymat, Thabet M

    2015-08-04

    More than 1,500 construction and demolition debris (CDD) landfills operate in the United States (U.S.), and U.S. federal regulations do not require containment features such as low-permeability liners and leachate collection systems for these facilities. Here we evaluate groundwater quality from samples collected in groundwater monitoring networks at 91 unlined, permitted CDD landfills in Florida, U.S. A total of 460,504 groundwater sample results were analyzed, with a median of 10 years of quarterly or semiannual monitoring data per site including more than 400 different chemical constituents. Downgradient concentrations of total dissolved solids, sulfate, chloride, iron, ammonia-nitrogen, and aluminum were greater than upgradient concentrations (p < 0.05). At downgradient wells where sulfate concentrations were greater than 150 mg/L (approximately 10% of the maximum dissolved sulfate concentration in water, which suggests the presence of leachate from the landfill), iron and arsenic were detected in 91% and 43% of samples, with median concentrations of 1,900 μg/L and 11 μg/L, respectively. These results show that although health-based standards can be exceeded at unlined CDD landfills, the magnitude of detected chemical concentrations is generally small and reflective of leached minerals from components (wood, concrete, and gypsum drywall) that comprise the bulk of discarded CDD by mass.

  20. The NUSTAR project at FAIR

    NASA Astrophysics Data System (ADS)

    Nilsson, Thomas; the NUSTAR Collaboration

    2015-11-01

    The FAIR facility, under construction at the GSI site in Darmstadt, will be addressing a wealth of outstanding questions within the realm of subatomic, atomic, plasma, bio-physics and applications through a combination of novel accelerators, storage rings and innovative experimental set-ups. One of the key installations is the fragment separator Super-FRS that will be able to deliver an unprecedented range of radioactive ion beams in the energy range of 0-1.5 GeV u-1. These beams will be distributed to three branches, each with its unique domain with respect to beam energies and properties. The high-energy branch will permit reactions with radioactive beams at relativistic energies, whereas the low-energy branch will supply decelerated beams for high-resolution spectroscopy, traps and laser spectroscopy. Finally, the ring branch will uniquely permit stored and cooled exotic beams for a range of methods only possible in a storage ring. Thus, by developing experimental set-ups tailored for these beams, there are several complementary possibilities to gain information on key nuclei and reaction, to further our understanding on contemporary questions within nuclear structure and nuclear astrophysics. This ambitious programme is to be exploited within the nuclear structure, astrophysics and reactions collaboration.

  1. Tunable Rare Earth fcu-MOF Platform: Access to Adsorption Kinetics Driven Gas/Vapor Separations via Pore Size Contraction.

    PubMed

    Xue, Dong-Xu; Belmabkhout, Youssef; Shekhah, Osama; Jiang, Hao; Adil, Karim; Cairns, Amy J; Eddaoudi, Mohamed

    2015-04-22

    Reticular chemistry approach was successfully employed to deliberately construct new rare-earth (RE, i.e., Eu(3+), Tb(3+), and Y(3+)) fcu metal-organic frameworks (MOFs) with restricted window apertures. Controlled and selective access to the resultant contracted fcu-MOF pores permits the achievement of the requisite sorbate cutoff, ideal for selective adsorption kinetics based separation and/or molecular sieving of gases and vapors. Predetermined reaction conditions that permitted the formation in situ of the 12-connected RE hexanuclear molecular building block (MBB) and the establishment of the first RE-fcu-MOF platform, especially in the presence of 2-fluorobenzoic acid (2-FBA) as a modulator and a structure directing agent, were used to synthesize isostructural RE-1,4-NDC-fcu-MOFs based on a relatively bulkier 2-connected bridging ligand, namely 1,4-naphthalenedicarboxylate (1,4-NDC). The subsequent RE-1,4-NDC-fcu-MOF structural features, contracted windows/pores and high concentration of open metal sites combined with exceptional hydrothermal and chemical stabilities, yielded notable gas/solvent separation properties, driven mostly by adsorption kinetics as exemplified in this work for n-butane/methane, butanol/methanol, and butanol/water pair systems.

  2. 76 FR 35431 - Draft National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ...: Table 1--Entities Potentially Regulated by This Permit North American Examples of affected Industry... intend the preceding table to be exhaustive, but provides it as a guide for readers regarding entities.../wastetech/guide/construction/index.cfm . B. Extension of Comment Period EPA is extending the deadline for...

  3. 43 CFR 3212.22 - What criteria establish a new facility for the purpose of obtaining a production incentive?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MINERALS MANAGEMENT (3000) GEOTHERMAL RESOURCE LEASING Lease Suspensions, Cessation of Production, Royalty Rate Reductions, and Energy Policy Act Royalty Rate Conversions § 3212.22 What criteria establish a new... not: (1) Be permitted only with a Geothermal Drilling Permit; (2) Be constructed entirely within the...

  4. 78 FR 67336 - Habitat Conservation Plan for the United Water Conservation District, Santa Clara River Watershed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... incidental take permits for United's construction, operations, and maintenance of water management facilities... maintenance of the Freeman Diversion; diversion of water from the Santa Clara River; vegetation management... current and future water management activities. United intends to request a 50-year permit covering five...

  5. 76 FR 76713 - Agency Information Collection Activities; Proposed Collections; Comment Request; Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... review programs for new or modified stationary sources of air pollution. In addition, the provisions of... the emissions from the construction and modification of any stationary source of air pollution to... Flexible Air Permitting Rule also slightly reduced the burden per minor NSR permit. As a result of all...

  6. 78 FR 27196 - Modification of Permit Application and Intent for Additional Public Scoping for an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... simulations. Final channel design and associated environmental impacts will be addressed during the permitting and EIS process. The EIS will evaluate the effects of construction and long term effects of the... in the EIS process; announce the plans for an additional public scoping meeting; solicit public...

  7. 40 CFR 52.1384 - Emission control regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction permit to override a requirement that has been approved as part of the SIP, are disapproved. We cannot approve these provisions into the SIP, as it would allow the State to change a SIP requirement through the issuance of a permit. Pursuant to section 110 of the Act, to change a requirement of the SIP...

  8. A Phloem Sandwich Unit for Observing Bark Beetles, Associated Predators, and Parasites

    Treesearch

    Donald N. Kim; Mitchel C. Miller

    1981-01-01

    This paper describes a phloem sandwich that allows observation of parent beetles, their brood, and associates within the inner bark, and permits observation of predator and parasite behavior on the bark surface. The construction of the unit permits the introduction of multiple pairs of beetles into a single sandwich.

  9. 29 CFR 1926.152 - Flammable liquids.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to permit approach of fire control apparatus. (3) The storage area shall be graded in a manner to... feet of each portable tank, there shall be a 12-foot-wide access way to permit approach of fire control... storage cabinets shall be constructed in the following manner, or equivalent: The bottom, sides, and top...

  10. Systematic mapping of contact sites reveals tethers and a function for the peroxisome-mitochondria contact.

    PubMed

    Shai, Nadav; Yifrach, Eden; van Roermund, Carlo W T; Cohen, Nir; Bibi, Chen; IJlst, Lodewijk; Cavellini, Laetitia; Meurisse, Julie; Schuster, Ramona; Zada, Lior; Mari, Muriel C; Reggiori, Fulvio M; Hughes, Adam L; Escobar-Henriques, Mafalda; Cohen, Mickael M; Waterham, Hans R; Wanders, Ronald J A; Schuldiner, Maya; Zalckvar, Einat

    2018-05-02

    The understanding that organelles are not floating in the cytosol, but rather held in an organized yet dynamic interplay through membrane contact sites, is altering the way we grasp cell biological phenomena. However, we still have not identified the entire repertoire of contact sites, their tethering molecules and functions. To systematically characterize contact sites and their tethering molecules here we employ a proximity detection method based on split fluorophores and discover four potential new yeast contact sites. We then focus on a little-studied yet highly disease-relevant contact, the Peroxisome-Mitochondria (PerMit) proximity, and uncover and characterize two tether proteins: Fzo1 and Pex34. We genetically expand the PerMit contact site and demonstrate a physiological function in β-oxidation of fatty acids. Our work showcases how systematic analysis of contact site machinery and functions can deepen our understanding of these structures in health and disease.

  11. 14 CFR 420.30 - Launch site location review for permitted launch vehicles.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.30 Launch site location review for...

  12. 14 CFR 420.30 - Launch site location review for permitted launch vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING LICENSE TO OPERATE A LAUNCH SITE Criteria and Information Requirements for Obtaining a License § 420.30 Launch site location review for...

  13. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  14. 40 CFR 62.14356 - Compliance schedules and increments of progress.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTANTS Federal Plan Requirements for Municipal Solid Waste Landfills That Commenced Construction Prior to...) to initiate on-site construction or initiate on-site installation of emission collection and/or control equipment. (3) Initiate on-site construction: Initiate on-site construction or initiate on-site...

  15. 75 FR 61577 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... workers certified in the top five industries were as follows: Construction--30,242; Amusement, Gambling... employment in each of these industries: Construction--0.4 percent (30,242/7,265,648); Amusement, Gambling... permitted each year: Construction--0.2 percent (14,756/7,265,648); Amusement, Gambling, and Recreation--0.5...

  16. United States housing, fourth quarter 2013

    Treesearch

    Delton Alderman

    2017-01-01

    In the beginning of 2013, the U.S. housing construction market indicated increases in all sectors; yet, by the fourth quarter’s end, only housing under construction improved. Moderation and declines are to be expected in the fourth quarter, as winter is setting in. Permits, starts, housing under construction, completions, and new and existing house sales all exceeded...

  17. 75 FR 352 - FFP Qualified Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Hydro 18 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... Hydro 18 LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal... electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site...

  18. Field studies of beach cones as coastal erosion control/reversal devices for areas with significant oil and gas activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-17

    A field demonstration/study of a novel shoreline erosion protection device called beach cones is planned. These patented, fiberglass- reinforced concreted devices are to be deployed in a number of geometric patterns at seven location in the Bastian Bay area of Western Plaquemines Parish. The purpose of the work described in this report was to evaluate the proposed study's impact on living and non-living shellfish resources within each of the project's seven separate Study Areas. Major accomplishments for this reporting period were as follows: aerial photographs of the experimental sites were taken; all permit applications were filed; information was submitted formore » the Environmental Report; several reconnaissance trips to the experimental sites were made; meetings were held among all participating organizations to further plan the research; permit was obtained from the US Army Corps of Engineers; test sites were surveyed by the Xavier University contingent; survey data were taken at all sites; the Oyster Assessment was completed; permit was obtained from the State of Louisiana Department of Natural Resources; and initial survey data were finalized at all sites.« less

  19. Status of H-Coal commercial activities. [Kentucky

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hicks, H.N. Jr.

    1981-01-01

    The H-Coal process is a development of Hydrocarbon Research, Inc. (HRI). It converts coal by catalytic hydrogenation to substitutes for petroleum ranging from a low sulfur fuel oil to an all distillate synthetic crude, the latter representing a potential source of raw material for the petrochemical industry. The process is a related application to HRI's H-Oil process which is used commercially for the desulfurization of residual oils from crude oil refining. A large scale pilot plant was constructed at Catlettsburg, Kentucky that is designed to process 200 to 600 TPD of coal. The paper includes an update on the keymore » activities associated with the Breckinridge Project: Pilot Plant H-Coal at Catlettsburg, Kentucky; commercial design activities in Houston; and permit and EIS activities for the Addison, Kentucky plant site.« less

  20. Optimizing Aerobot Exploration of Venus

    NASA Astrophysics Data System (ADS)

    Ford, Kevin S.

    1997-03-01

    Venus Flyer Robot (VFR) is an aerobot; an autonomous balloon probe designed for remote exploration of Earth's sister planet in 2003. VFR's simple navigation and control system permits travel to virtually any location on Venus, but it can survive for only a limited duration in the harsh Venusian environment. To help address this limitation, we develop: (1) a global circulation model that captures the most important characteristics of the Venusian atmosphere; (2) a simple aerobot model that captures thermal restrictions faced by VFR at Venus; and (3) one exact and two heuristic algorithms that, using abstractions (1) and (2), construct routes making the best use of VFR's limited lifetime. We demonstrate this modeling by planning several small example missions and a prototypical mission that explores numerous interesting sites recently documented in the plane tary geology literature.

  1. Optimizing Aerobot Exploration of Venus

    NASA Technical Reports Server (NTRS)

    Ford, Kevin S.

    1997-01-01

    Venus Flyer Robot (VFR) is an aerobot; an autonomous balloon probe designed for remote exploration of Earth's sister planet in 2003. VFR's simple navigation and control system permits travel to virtually any location on Venus, but it can survive for only a limited duration in the harsh Venusian environment. To help address this limitation, we develop: (1) a global circulation model that captures the most important characteristics of the Venusian atmosphere; (2) a simple aerobot model that captures thermal restrictions faced by VFR at Venus; and (3) one exact and two heuristic algorithms that, using abstractions (1) and (2), construct routes making the best use of VFR's limited lifetime. We demonstrate this modeling by planning several small example missions and a prototypical mission that explores numerous interesting sites recently documented in the plane tary geology literature.

  2. Guidance on Initial Site Assessment at Corrective Action Sites

    EPA Pesticide Factsheets

    Guidance to be used to conduct Corrective Action site assessment efforts. Informs Resource Conservation and Recovery Act (RCRA) permit writers and enforcement officials of procedures to be used in conducting RCRA Facility Assessments.

  3. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Administrator of the Environmental Protection Agency (“EPA”) conditionally exempts electric generating units on... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... to be constructed at Orote, with the following conditions: (i) Each electric generating unit shall...

  4. Instream biological assessment of NPDES point source discharges at the Savannah River Site, 1997-1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Specht, W.L.

    2000-02-28

    The Savannah River Site currently has 33 permitted NPDES outfalls that have been permitted by the South Carolina Department of Health an Environmental Control to discharge to SRS streams and the Savannah River. In order to determine the cumulative impacts of these discharges to the receiving streams, a study plan was developed to perform in-stream assessments of the fish assemblages, macroinvertebrate assemblages, and habitats of the receiving streams.

  5. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-06-17

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage atmore » the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.« less

  6. Mitigating Settlement of Structures founded on Peat

    NASA Astrophysics Data System (ADS)

    Wijeyesekera, D. C.; Numbikannu, L.; Ismail, T. N. H. T.; Bakar, I.

    2016-07-01

    Observations made of two common failures of structures founded on peat/organic soil in Johor, Malaysia is presented. Critical evaluation of current lightweight fill technology to mitigate such settlement is also discussed. Lightweight technology, such as Expanded Polystyrene (EPS), has been used in construction on soft yielding ground for decades. Regrettably, some published information of EPS failures to perform on construction sites are also cited in this paper. This paper outlines some concepts leading to the development of an alternative innovative lightweight fill is that the idealised cellular structure of the GCM permit free flow of water and complemented by the mat structure which evens out any differential settlement A further highlight of this paper is the monitoring of the field performance of this lightweight fill (GCM) as a feasible alternative to fill weight reduction on yielding ground.. Hence, a prime research objective was to compare the fill settlements observed with 1m high fill of surcharge loading on peat ground (comparison of the case of using a partial 0.6m high GCM and that of a total of 1m of conventional sand backfill).

  7. 75 FR 65646 - Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... II of the Lompoc Wind Energy Project would involve the construction and operation of wind turbines... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R8-ES-2010-N235; 1112-0000-81440-F2] Endangered and Threatened Wildlife and Plants; Permit, Santa Barbara County, CA AGENCY: U.S. Fish and...

  8. 75 FR 64863 - Prevention of Significant Deterioration (PSD) for Particulate Matter Less Than 2.5 Micrometers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... permit applicant's burden and streamline the permitting process for de minimis circumstances. These tools... pollutant is de minimis. An emission increase for a particular pollutant that is greater than the SER... construct, is less than the SMC, i.e., de minimis, and may be allowed to forego the preconstruction...

  9. 78 FR 52965 - Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ...-FF04EF2000] Endangered and Threatened Wildlife and Plants; Receipt of Application for Incidental Take Permit... 1.49 acres of foraging, breeding, and sheltering habitat used by the Florida scrub-jay (Aphelocoma... taking 1.49 acre of Florida scrub-jay breeding, feeding, and sheltering habitat for construction of a...

  10. 75 FR 34516 - Issuance of an Amended Presidential Permit Authorizing the Construction, Operation, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... facilities in the United States. This permit is subject to the following conditions: Article 1. The United... Secretary of State or the Secretary's delegate. Article 2. (1) Standards for, and manner of, the... Authority Number 0170.1. Article 3. The permittee shall comply with all Federal and State laws and...

  11. 78 FR 16565 - Notice of Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) and To Conduct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Permits for the construction, connection, operation, or maintenance at the borders of the United States... Department for an amendment to their current Presidential Permit authorizing it to operate at a higher... address current and future demand by U.S. and Canada refineries for supplies of heavy crude oil from the...

  12. 77 FR 65305 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... incorporates District Rule 2410-- Prevention of Significant Deterioration (PSD)--into the California SIP to establish a PSD permit program for pre-construction review of certain new and modified major stationary... provides an adequate PSD permitting program as required by section 110 and part C of title I of the CAA...

  13. 78 FR 58270 - Cleveland National Forest, California, SDG&E Master Special Use Permit and Permit To Construct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ..., while providing for the operation and maintenance of the SDG&E electric powerline system. The project... communities, residents, businesses, and government owned facilities located within and adjacent to the... managed by the Bureau of Land Management (BLM); tribal lands of the La Jolla, Campo, Inaja, and Viejas...

  14. Carbon Mineralization by Aqueous Precipitation for Beneficial Use of CO2 from Flue Gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Devenney, Martin; Gilliam, Ryan; Seeker, Randy

    2013-08-01

    The objective of this project is to demonstrate an innovative process to mineralize CO2 from flue gas directly to reactive carbonates and maximize the value and versatility of its beneficial use products. The program scope includes the design, construction, and testing of a CO2 Conversion to Material Products (CCMP) Pilot Demonstration Plant utilizing CO2 from the flue gas of a power production facility in Moss Landing, CA. This topical report covers Subphase 2a which is the design phase of pilot demonstration subsystems. Materials of construction have been selected and proven in both lab scale and prototype testing to be acceptablemore » for the reagent conditions of interest. The target application for the reactive carbonate material has been selected based upon small-scale feasibility studies and the design of a continuous fiber board production line has been completed. The electrochemical cell architecture and components have been selected based upon both lab scale and prototype testing. The appropriate quality control and diagnostic techniques have been developed and tested along with the required instrumentation and controls. Finally the demonstrate site infrastructure, NEPA categorical exclusion, and permitting is all ready for the construction and installation of the new units and upgrades.« less

  15. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    NASA Astrophysics Data System (ADS)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  16. There and Back Again: An Acquisition Study

    ERIC Educational Resources Information Center

    Xu, Ting; Snyder, William

    2017-01-01

    When "again" modifies an English goal-PP construction, the sentence is ambiguous between a repetitive and a restitutive reading. Interestingly, languages vary in whether their counterpart to English "again" permits a restitutive reading with goal-PP constructions (Beck 2005; Beck & Snyder 2001). This article explores how…

  17. [A gearing mechanism with 4 degrees of freedom for robotic applications in medicine].

    PubMed

    Pott, P; Weiser, P; Scharf, H P; Schwarz, M

    2004-06-01

    Applications in robot-aided surgery are currently based on modifications of manipulators used in industrial manufacturing processes. In this paper we describe novel rotatory kinematics for a manipulator, specially developed for deployment in robot-aided surgery. The construction of the gearing mechanism used for the positioning and orientation of a linkage point is described. Forward and inverse kinematics were calculated, and a constructive solution proposed. The gearing mechanism is based on two disk systems, each of which consists of two opposing rotatable discs. The construction was designed in such a way that the linkage point can be positioned freely anywhere within the mechanism's range of motion. The kinematics thus permits an x-y-positioning via rotating movements only. The spatial arrangement of two of such disc systems permits movements in four degrees of freedom (DOF). The construction is compact, but can be further miniaturized, is flexible and manufacturing costs are low. On the basis of this mechanical concept a new, small automated manipulator for surgical application will be developed.

  18. Report on Lessons Learned from the NP 2010 Early Site Permit Program FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2008-03-26

    This report provides a summary of lessons learned from the demonstration of the licensing process for three Early Site Permit (ESP) applications supported as part of the Department of Energy’s (DOE) Nuclear Power 2010 (NP 2010) program. The ESP process was established by the Nuclear Regulatory Commission (NRC) to enable completion of the site evaluation component of nuclear power plant licensing under 10 CFR Part 52 before a utility makes a decision to build a plant. Early Site Permits are valid for 10 to 20 years and can be renewed for an additional 10 to 20 years. NRC review ofmore » an ESP application addresses site safety issues, environmental protection issues, and plans for coping with emergencies. Successful completion of the ESP process will establish that a site is suitable for possible future construction and operation of a nuclear power plant. Most importantly, an ESP resolves significant site-related safety and environmental issues early in the decision process and helps achieve acceptance by the public. DOE competitively selected Dominion Nuclear Energy North Anna, LLC (Dominion); System Energy Resources, Inc. (an Entergy subsidiary); and Exelon Generation Company, LLC (Exelon) in 2002 to demonstrate the ESP process and provided cost-shared support through the NP 2010 program. Dominion pursued an ESP for the North Anna site in Virginia; System Energy Resources, Inc. pursued an ESP for the Grand Gulf site in Mississippi; and Exelon pursued an ESP for the Clinton site in Illinois. After successfully demonstrating the process, the NRC issued an ESP for Clinton on March 17, 2007; Grand Gulf on April 5, 2007; and North Anna on November 27, 2007. As with all successful projects, there are lessons to be learned from the NP 2010 early site permitting demonstration that can help improve future implementation guidance documents and regulatory review standards. In general, these lessons pertain to the effectiveness of the regulatory process, experience related to guidance for developing and reviewing ESP applications, issues involving ESP plant parameters, and suggestions for future ESP applicants. The development, submittal, and issuance of these first ESPs under DOE’s NP 2010 program started the momentum to exercise NRC’s new 10 CFR Part 52 licensing process. Several key questions that define critical issues regarding the effectiveness of regulations pertaining to ESPs have been identified and summarized in this report. However, the final resolution of whether the ESP component of the Part 52 process significantly contributes to the predictability in nuclear power plant licensing requires more experience and time, such as the completion of the ongoing combined Construction and Operating License (COL) process for the North Anna and Grand Gulf sites. The three ESP project participants prepared and submitted to DOE lessons learned reports from their experience in developing, submitting, and receiving an ESP. This document summarizes these reports, which are appended hereto. The Nuclear Energy Institute (http://www.nei.org/) and NRC (http://www.nrc.gov/) have also prepared reports regarding their perspectives on lessons learned during the ESP process. Their documents can be accessed on their respective web sites. Following is a summary of the lessons learned from the NP 2010 ESP projects. Effectiveness of the ESP Process: In general, the ESP process is expected (subject to demonstration of the ESP finality provisions in the North Anna and Grand Gulf ESPs) to provide high value for applicants as a site banking and risk mitigation strategy. However, several aspects of the initial process, such as NRC hearings and determining an acceptable approach to the NRC’s Emergency Planning requirements, proved challenging for the applicants. Project Execution: Initial regulatory and industry guidance for planning and executing an ESP application program proved to be insufficient to address NRC’s document review expectations. However, continuous communication between NRC and the applicants helped establish an acceptable framework for the applications and resulted in the successful issuance of three ESPs. Still, formal guidance from both NRC and industry is needed for issues involving merchant plants; data collection issues; and interactions between NRC, the public, and the applicants. Specific Plant Parameter Issues: The use of the Plant Parameter Envelope (PPE) approach, when the applicant has not yet chosen a reactor technology, proved to be a major source of confusion between applicants and NRC. This issue had also been a topic of discussion during the NRC ESP hearings. Based upon North Anna and Grand Gulf COLA experiences, the need should be evaluated for future NRC guidance pertaining to the PPE approach to clarify these issues. In addition, NRC, applicants, and industry spent considerable time and resources deciding how to employ new seismic analysis approaches. Future guidance in this area would also be very useful. Best Project Practices: A variety of good practices were identified, such as using specific project tracking and milestone items, handling very large documents electronically, employing a formal and rigorous document review process, and sharing large files across organizational sites. This report also includes a set of general recommendations to assist future ESP applicants. Several recommendations highlight the need for NRC and industry to continue to work together to improve the ESP process.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adamov, E.O.; Lebedev, V.A.; Kuznetsov, Yu.N.

    Zheleznogorsk is situated near the territorial center -- Krasnoyarsk on the Yenisei river. Mining and chemical complex is the main industrial enterprise of the town, which has been constructed for generation and used for isolation of weapons-grade plutonium. Heat supply to the chemical complex and town at the moment is largely provided by nuclear co-generation plant (NCGP) on the basis of the ADEh-2 dual-purpose reactor, generating 430 Gcal/h of heat and, partially, by coal backup peak-load boiler houses. NCGP also provides 73% of electric power consumed. In line with agreements between Russia and USA on strategic arms reduction and phasingmore » out of weapons-grade plutonium production, decommissioning of the ADEh-2 reactor by 2000 is planned. Thus, a problem arises relative to compensation for electric and thermal power generation for the needs of the town and industrial enterprises, which is now supplied by the reactor. A nuclear power plant constructed on the same site as a substituting power source should be considered as the most practical option. Basic requirements to the reactor of substituting nuclear power plant are as follows. It is to be a new generation reactor on the basis of verified technologies, having an operating prototype optimal for underground siting and permitting utmost utilization of the available mining workings and those being disengaged. NCGP with the reactor is to be constructed in the time period required and is to become competitive with other possible power sources. Analysis has shown that the VK-300 simplified vessel-type boiling reactor meets the requirements made in the maximum extent. Its design is based on the experience of the VK-50 reactor operation for a period of 30 years in Dimitrovgrad (Russia) and allows for experience in the development of the SBWR type reactors. The design of the reactor is discussed.« less

  20. REFINE WETLAND REGULATORY PROGRAM

    EPA Science Inventory

    The Tribes will work toward refining a regulatory program by taking a draft wetland conservation code with permitting incorporated to TEB for review. Progress will then proceed in developing a permit tracking system that will track both Tribal and fee land sites within reservati...

  1. 10 CFR 36.15 - Start of construction.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Requirements § 36.15 Start of construction. The applicant may not begin construction of a new irradiator prior... work, purchase of a site, site surveys or soil testing, site preparation, site excavation, construction... license with respect to the requirements of the Atomic Energy Act of 1954, as amended, and rules...

  2. PILOT PEAT-BED TREATMENT SYSTEM FOR NPDES OUTFALL H-12

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halverson, N; Ralph Nichols, R; Topher Berry, T

    2007-10-22

    A National Pollutant Discharge Elimination System (NPDES) Permit was issued to the Savannah River Site (SRS) by the South Carolina Department of Health and Environmental Control (SCDHEC) and became effective on December 1, 2003. The new permit contained revised limits for copper and zinc derived by adjusting the South Carolina aquatic life water quality standards in accordance with dissolved metals criteria. The new copper and zinc limits are very low and may not be met consistently at Outfall H-12. The outfall has periodically exceeded the new 6 {micro}g/l (0.006 mg/L) monthly average limit and the 8 {micro}g/l (0.008 mg/L) maximummore » limit for copper and recently has begun exceeding the 100 {micro}g/l (0.100 mg/L) limit for zinc. The compliance date for Outfall H-12 is November 1, 2008. A study was conducted on this outfall and other outfalls to evaluate possible alternatives for meeting the new permit limits (Shipman and Bugher 2004). The study team recommended construction of a peat bed for treatment of the Outfall H-12 effluent. This recommendation was repeated by a second alternatives study team in 2007 (WSRC 2007). A bench-scale laboratory study demonstrated the feasibility of peat-bed treatment for Outfall H-12 effluent, with the peat demonstrating excellent removal of copper (Nelson and Specht 2005). An additional study was performed in 2006 and early 2007 using vertical-flow peat columns to investigate the influence of water retention time (contact time) on the removal of copper and zinc from the water (Nelson 2007c). Analytical results indicated that copper removal was very high at each of the three retention times tested, ranging from 99.6% removal at five and three hours to 98.8% removal at one hour. Effluent copper levels from these studies were much lower than the new compliance limit for the outfall. Most divalent metals, including zinc, were removed to below their normal reporting detection limit. The H-Area Material Disposition organization requested a larger-scale study to investigate key design and operation parameters/issues, such as the possibility of rapid plugging of the piping or clogging of the peat bed, the effectiveness of the treatment, hydraulic conductivity, etc. The resulting pilot-scale facility was constructed adjacent to Outfall H-12 with SCDHEC approval (Mullinax 2007). The pilot-scale study was performed by the Savannah River National Laboratory's (SRNL) Environmental Science and Biotechnology Directorate personnel. Since the construction and operation of the pilot-scale peat bed facility, however, a new strategy for achieving compliance of Outfall H-12 effluent with the new permit limits has been selected. This new strategy incorporates a variety of efforts including source reduction, recalculation of limits using an aquatic species that is indigenous to the area instead of a standard species, and dissolved organic carbon addition to reduce copper toxicity. This report documents the construction and operation of the pilot-scale treatment system, the results obtained, and recommendations on the usefulness of this technology for Outfall H-12 or other outfalls at SRS.« less

  3. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  4. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  5. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  6. 43 CFR 3802.1-1 - When required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) MINING CLAIMS UNDER THE GENERAL MINING LAWS Exploration... which involve construction of means of access, including bridges, landing areas for aircraft, or... can be covered by a temporory use permit issued under part 2930 of this chapter; (e) The construction...

  7. Do post-mining constructed channels replace functional characteristics of headwater streams?

    EPA Science Inventory

    Mountaintop mining and valley fill (MTMVF) is a method of coal mining common in eastern Kentucky and southern West Virginia. Over 1200 miles of stream channel have been buried by MTMVF. Permits for surface coal mining have recognized constructed drainage ditches associated with ...

  8. Future U.S. supply of Mo-99 production through fission based LEU/LEU technology.

    PubMed

    Welsh, James; Bigles, Carmen I; Valderrabano, Alejandro

    Coquí RadioPharmaceuticals Corp. (Coquí) has the goal of establishing a medical isotope production facility for securing a continuous domestic supply of the radioisotope molybdenum-99 for U.S. citizens. Coquí will use an LEU/LEU proven and implemented open pool, light-water, 10 MW, reactor design. The facility is being designed with twin reactors for reliability an on-site hot lab chemical processing and a waste conditioning area and a possible generator producing radio-chemistry lab. Coquí identified a 25 acre site adjacent to an existing industrial park in northern central Florida. This land was gifted and transferred to Coquí by the University of Florida Foundation. We are in the process of developing licensing documents related to the facility. The construction permit application for submission to the U.S. Nuclear Regulatory Commission is currently being prepared. Submission is scheduled for mid to late 2015. Community reaction to the proposed development has been positive. We expect to create 220 permanent jobs and we have an anticipated to be operational by 2020.

  9. EIS No. 20100312 EIS Comanche Peak Nuclear Power Plant Units 3 and 4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bjornstad, David J

    2010-08-01

    In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31,more » 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant Units 3 and 4, Application for Combined Licenses (COLs) for Construction Permits and Operating Licenses, (NUREG-1943), Hood and Somervell Counties, TX, Comment Period Ends: 10/26/2010.« less

  10. Holocene sea-level changes along the Strait of Magellan and Beagle Channel, southernmost South America

    NASA Astrophysics Data System (ADS)

    Porter, Stephen C.; Stuiver, Minze; Heusser, Calvin J.

    1984-07-01

    Radiocarbon-dated marine sediments from five coastal sites along the Strait of Magellan and Beagle Channel in southernmost Chile permit construction of a curve of relative sea-level fluctuations during the Holocene. Morphologic and stratigraphic data point to coastal submergence during the early Holocene as the sea rose to a maximum level at least 3.5 m higher than present about 5000 yr ago. Progressive emergence then followed during the late Holocene. Data from widely separated localities define a smooth curve, the form of which is explainable in terms of isostatic and hydroisostatic deformation of the crust resulting from changing ice and water loads. Apparently anomalous data from one site located more than 100 km behind the outer limit of the last glaciation may reflect isostatic response to deglaciation. The sea-level curve resembles one derived by Clark and Bloom (1979, In "Proceedings of the 1978 International Symposium on Coastal Evolution in the Quaternary, Sao Paulo, Brasil," pp. 41-60. Sao Paulo) using a spherical Earth model, both in amplitude and in the timing of the maximum submergence.

  11. Use of geographic information systems for applications on gas pipeline rights-of-way. Final report, December 1989--December 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, P.J.

    1991-12-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way for this project (ROWs) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1)more » determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWs; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.« less

  12. Use of geographic information systems for applications on gas pipeline rights-of-way

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, P.J.

    1991-12-01

    Geographic information system (GIS) applications for the siting and monitoring of gas pipeline rights-of-way for this project (ROWs) were developed for areas near Rio Vista, California. The data layers developed for this project represent geographic features, such as landcover, elevation, aspect, slope, soils, hydrography, transportation, endangered species, wetlands, and public line surveys. A GIS was used to develop and store spatial data from several sources; to manipulate spatial data to evaluate environmental and engineering issues associated with the siting, permitting, construction, maintenance, and monitoring of gas pipeline ROWS; and to graphically display analysis results. Examples of these applications include (1)more » determination of environmentally sensitive areas, such as endangered species habitat, wetlands, and areas of highly erosive soils; (2) evaluation of engineering constraints, including shallow depth to bedrock, major hydrographic features, and shallow water table; (3) classification of satellite imagery for landuse/landcover that will affect ROWs; and (4) identification of alternative ROW corridors that avoid environmentally sensitive areas or areas with severe engineering constraints.« less

  13. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  14. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  15. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  16. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  17. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  18. 76 FR 3892 - Auction of FM Broadcast Construction Permits Rescheduled for April 27, 2011; Notice and Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-21

    .... The commenter also argues that, in the event that only one applicant places a bid on a permit, that...). The Commission makes no warranty whatsoever with respect to the FCC Auction System. In no event shall..., 2011 Short-Form Application (FCC Form 175) Filing Window Opens--January 31, 2011; 12 noon ET Short-Form...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, C.; Blake, C.; Burgess, R.

    This report explains the Regulations, Codes, and Standards (RCS) requirements for hydrogen dispensing stations in the State of California. The reports shows the basic components of a hydrogen dispensing station in a simple schematic drawing; the permits and approvals that would typically be required for the construction and operation of a hydrogen dispensing station; and a basic permit that might be employed by an Authority Having Jurisdiction (AHJ).

  20. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  1. Field studies of beach cones as coastal erosion control/reversal devices for areas with significant oil and gas activities. Technical progress report, April--June 1992 and Project status report, June 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-17

    A field demonstration/study of a novel shoreline erosion protection device called beach cones is planned. These patented, fiberglass- reinforced concreted devices are to be deployed in a number of geometric patterns at seven location in the Bastian Bay area of Western Plaquemines Parish. The purpose of the work described in this report was to evaluate the proposed study`s impact on living and non-living shellfish resources within each of the project`s seven separate Study Areas. Major accomplishments for this reporting period were as follows: aerial photographs of the experimental sites were taken; all permit applications were filed; information was submitted formore » the Environmental Report; several reconnaissance trips to the experimental sites were made; meetings were held among all participating organizations to further plan the research; permit was obtained from the US Army Corps of Engineers; test sites were surveyed by the Xavier University contingent; survey data were taken at all sites; the Oyster Assessment was completed; permit was obtained from the State of Louisiana Department of Natural Resources; and initial survey data were finalized at all sites.« less

  2. Methods for generating or increasing revenues from crops

    DOEpatents

    Copenhaver, Gregory P.; Keith, Kevin; Preuss, Daphne

    2007-03-20

    The present invention provides methods of doing business and providing services. For example, methods of increasing the revenue of crops are provided. To this end, the method includes the use of a nucleic acid sequences of plant centromeres. This will permit construction of stably inherited recombinant DNA constructs and mini chromosomes which can serve as vectors for the construction of transgenic plant and animal cells.

  3. 36 CFR 212.8 - Permission to cross lands and easements owned by the United States and administered by the Forest...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interests of the United States. Permits for such road construction or use will be non-exclusive and will be... States and administered by the Forest Service. (a) Permission to construct or use roads across lands and... benefit is needed by the United States, permission to construct or use a road across lands and across...

  4. 50 CFR 300.103 - Procedure for according protection to CCAMLR Ecosystem Monitoring Program Sites.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... valid for a period of up to five years. Applicants requesting a permit to reenter a Protected Site must... corner of Elephant Island, South Shetland Islands. The Seal Islands CEMP Protected Site includes the...

  5. Environmenal analysis of the Bayo Canyon (TA-10) Site, Los Alamos, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferenbaugh, R.W.; Buhl, T.E.; Stoker, A.K.

    1982-05-01

    The radiological survey of the old TA-10 site in Bayo Canyon found low levels of surface contamination in the vicinity of the firing sites and subsurface contamination in the old waste disposal area. The three alternatives proposed for the site are: (1) to take no action; (2) to restrict usage of the area of subsurface contamination to activities that cause no subsurface disturbance (minimal action); and (3) to remove the subsurface conamination to levels below the working criteria. Dose calculations indicate that doses from surface contamination for recreational users of the canyon, permanent residents, and construction workers and doses formore » workers involved in excavation of contaminated soil under the clean up alternative are only small percentages of applicable guidelines. No environmental impacts are associated with either the no-action or minimal action alternatives. The impact associated with the cleanup alternative is small, especially considering that the area already has been affected by the original TA-10 decommissioning action, but nevertheless, the preferred alternative is the minimal action alternative, where 0.6 hectare of land is restricted to surface activities. This leaves the rest of the canyon available for development with up to 400 homes. The restricted area can be used for a park, tennis courts, etc., and the /sup 90/Sr activity will decay to levels permitting unrestricted usage in about 160 y.« less

  6. Resonant inelastic x-ray scattering probes the electron-phonon coupling in the spin liquid κ -(BEDT-TTF)2Cu2(CN) 3

    NASA Astrophysics Data System (ADS)

    Ilakovac, V.; Carniato, S.; Foury-Leylekian, P.; Tomić, S.; Pouget, J.-P.; Lazić, P.; Joly, Y.; Miyagawa, K.; Kanoda, K.; Nicolaou, A.

    2017-11-01

    Resonant inelastic x-ray scattering at the N K edge reveals clearly resolved harmonics of the anion plane vibrations in the κ -(BEDT-TTF) 2Cu2 (CN) 3 spin-liquid insulator. Tuning the incoming light energy at the K edge of two distinct N sites permits us to excite different sets of phonon modes. The cyanide (CN) stretching mode is selected at the edge of the ordered N sites which are more strongly connected to the bis(ethylenedithio)tetrathiafulvalene (BEDT-TTF) molecules, while positionally disordered N sites show multimode excitation. Combining measurements with calculations on an anion plane cluster permits us to estimate the site-dependent electron-phonon coupling of the modes related to nitrogen excitation.

  7. Safety yoke would protect construction workers from falling

    NASA Technical Reports Server (NTRS)

    Goforth, O. H.

    1967-01-01

    Simple dismountable yoke protects construction workers on narrow steel I beams at high levels. The yoke engages the upper flat of the I beam and slides freely along it to permit freedom of movement to the worker while limiting his ability to fall by a harness attached to the yoke.

  8. 40 CFR 264.19 - Construction quality assurance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...

  9. 40 CFR 264.19 - Construction quality assurance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Compliance with the hydraulic conductivity requirements must be verified by using in-situ testing on the... specifications in the permit. The program must be developed and implemented under the direction of a CQA officer... description of how they will be constructed. (2) Identification of key personnel in the development and...

  10. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less

  11. 10 CFR 50.10 - License required; limited work authorization.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false License required; limited work authorization. 50.10... FACILITIES Requirement of License, Exceptions § 50.10 License required; limited work authorization. (a... permit, early site permit authorizing limited work authorization activities, combined license, or limited...

  12. 30 CFR 783.12 - General environmental resources information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that individual permits for mining will be sought; and (b) The nature of cultural historic and... archeological sites within the proposed permit and adjacent areas. (1) The description shall be based on all... Officer and local archeological, historical, and cultural preservation groups. (2) The regulatory...

  13. 30 CFR 783.12 - General environmental resources information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that individual permits for mining will be sought; and (b) The nature of cultural historic and... archeological sites within the proposed permit and adjacent areas. (1) The description shall be based on all... Officer and local archeological, historical, and cultural preservation groups. (2) The regulatory...

  14. 78 FR 48201 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... establishment of a permit system for various activities in Antarctica and designation of certain animals and... mammals at breeding, molting, and terrestrial, fast-ice, and sea-ice haul-out sites at various sub...

  15. 2010 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David B. Frederick

    2011-02-01

    This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (#LA 000160 01), for the wastewater reuse site at the Idaho National Laboratory Site’s Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond from May 1, 2010 through October 31, 2010. The report contains the following information: • Facility and system description • Permit required effluent monitoring data and loading rates • Groundwater monitoring data • Status of special compliance conditions • Discussion of the facility’s environmental impacts During the 2010 partial reporting year, an estimated 3.646 million gallons of wastewater were dischargedmore » to the Industrial Waste Ditch and Pond which is well below the permit limit of 13 million gallons per year. The concentrations of all permit-required analytes in the samples from the down gradient monitoring wells were below the Ground Water Quality Rule Primary and Secondary Constituent Standards.« less

  16. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  17. Discontinuation of approval of modifications in notes, guaranteed under Title VI or VII of the Public Health Service Act, proposed to permit use of the notes as collateral for tax-exempt financings--PHS. Final rule.

    PubMed

    1983-09-21

    The Department of Health and Human Services (HHS) adds a new section to regulations for making and guaranteeing loans for construction and modernization of hospitals and medical facilities and to regulations for guaranteeing loans for the construction of teaching facilities for health professions personnel. Under these regulations HHS will not approve the modification of the terms of an existing loan guaranteed under Title VI or Title VII of the Public Health Service (PHS) Act if the modification would permit use of the guarantee (or guaranteed loan) as collateral for tax-exempt financing.

  18. First In Vivo Use of a Capacitive Micromachined Ultrasound Transducer Array–Based Imaging and Ablation Catheter

    PubMed Central

    Stephens, Douglas N.; Truong, Uyen T.; Nikoozadeh, Amin; Oralkan, Ömer; Seo, Chi Hyung; Cannata, Jonathan; Dentinger, Aaron; Thomenius, Kai; de la Rama, Alan; Nguyen, Tho; Lin, Feng; Khuri-Yakub, Pierre; Mahajan, Aman; Shivkumar, Kalyanam; O’Donnell, Matt; Sahn, David J.

    2012-01-01

    Objectives The primary objective was to test in vivo for the first time the general operation of a new multifunctional intracardiac echocardiography (ICE) catheter constructed with a microlinear capacitive micromachined ultrasound transducer (ML-CMUT) imaging array. Secondarily, we examined the compatibility of this catheter with electroanatomic mapping (EAM) guidance and also as a radiofrequency ablation (RFA) catheter. Preliminary thermal strain imaging (TSI)-derived temperature data were obtained from within the endocardium simultaneously during RFA to show the feasibility of direct ablation guidance procedures. Methods The new 9F forward-looking ICE catheter was constructed with 3 complementary technologies: a CMUT imaging array with a custom electronic array buffer, catheter surface electrodes for EAM guidance, and a special ablation tip, that permits simultaneous TSI and RFA. In vivo imaging studies of 5 anesthetized porcine models with 5 CMUT catheters were performed. Results The ML-CMUT ICE catheter provided high-resolution real-time wideband 2-dimensional (2D) images at greater than 8 MHz and is capable of both RFA and EAM guidance. Although the 24-element array aperture dimension is only 1.5 mm, the imaging depth of penetration is greater than 30 mm. The specially designed ultrasound-compatible metalized plastic tip allowed simultaneous imaging during ablation and direct acquisition of TSI data for tissue ablation temperatures. Postprocessing analysis showed a first-order correlation between TSI and temperature, permitting early development temperature-time relationships at specific myocardial ablation sites. Conclusions Multifunctional forward-looking ML-CMUT ICE catheters, with simultaneous intracardiac guidance, ultrasound imaging, and RFA, may offer a new means to improve interventional ablation procedures. PMID:22298868

  19. Solar space heating installed at Kansas City, Kansas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The solar energy system was constructed with the 48,800 square feet warehouse to heat the warehouse area of about 39,000 square feet while an auxiliary energy system heats the office area of about 9,800 square feet. The building is divided into 20 equal units, and each has its own solar system. The modular design permits the flexibility of combining multiple units to form offices or warehouses of various size floor areas as required by a tenant. Each unit has 20 collectors which are mounted in a single row. The collectors are double glazed flat plate collectors with a gross area of 7,800 sq ft. Air is heated either through the collectors or by the electric resistance duct coils. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are presented.

  20. PVUSA: The value of photovoltaics in the distribution system. The Kerman Grid-Support Project

    NASA Astrophysics Data System (ADS)

    Wenger, Howard J.; Hoff, Thomas E.

    1995-05-01

    As part of the Photovoltaics for Utility Scale Applications Applications (PVUSA) Project Pacific Gas Electric Company (PG&E) built the Kerman 500-kW photovoltaic power plant. Located near the end of a distribution feeder in a rural section of Fresno County, the plant was not built so much to demonstrate PV technology, but to evaluate its interaction with the local distribution grid and quantify available nontraditional grid-support benefits (those other than energy and capacity). As demand for new generation began to languish in the 1980s, and siting and permitting of power plants and transmission lines became more involved, utilities began considering smaller, distributed power sources. Potential benefits include shorter construction lead time, less capital outlay, and better utilization of existing assets. The results of a PG&E study in 1990/1991 of the benefits from a PV system to the distribution grid prompted the PVUSA Project to construct a plant at Kerman. Completed in 1993, the plant is believed to be the first one specifically built to evaluate the multiple benefits to the grid of a strategically sited plant. Each of nine discrete benefits were evaluated in detail by first establishing the technical impact, then translating the results into present economic value. Benefits span the entire system from distribution feeder to the generation fleet. This work breaks new ground in evaluation of distributed resources, and suggests that resource planning practices be expanded to account for these non-traditional benefits.

  1. Battery cell feedthrough apparatus

    DOEpatents

    Kaun, Thomas D.

    1995-01-01

    A compact, hermetic feedthrough apparatus comprising interfitting sleeve portions constructed of chemically-stable materials to permit unique battery designs and increase battery life and performance.

  2. The N-terminus of the human copper transporter 1 (hCTR1) is localized extracellularly, and interacts with itself.

    PubMed Central

    Klomp, Adriana E M; Juijn, Jenneke A; van der Gun, Linda T M; van den Berg, Inge E T; Berger, Ruud; Klomp, Leo W J

    2003-01-01

    We have used indirect immunofluorescense studies and glycosylation-site insertion and deletion mapping to characterize the topology of human copper transporter 1 (hCTR1), the putative human high-affinity copper-import protein. Both approaches indicated that hCTR1 contains three transmembrane domains and that the N-terminus of hCTR1, which contains several putative copper-binding sites, is localized extracellularly, whereas the C-terminus is exposed to the cytosol. Based on previous observations that CTR1 proteins form high-molecular-mass complexes, we investigated directly whether CTR1 proteins interact with themselves. Yeast two-hybrid studies showed that interaction of yeast, mouse, rat and human CTR1 occurs at the sites of their N-terminal domains, and is not dependent on the copper concentration in the growth media. Analysis of deletion constructs indicated that multiple regions in the N-terminus are essential for this self-interaction. In contrast, the N-terminal tail of the presumed low-affinity copper transporter, hCTR2, does not interact with itself. Taken together, these results suggest that CTR1 spans the membrane at least six times, permitting formation of a channel, which is consistent with its proposed role as a copper transporter. PMID:12466020

  3. 32 CFR 767.7 - Conditions of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE JURISDICATION OF THE... to submit to NHC a working and diving log listing days spent in field research, activities pursued... protect all sensitive information regarding the location and character of the wreck site that could...

  4. 30 CFR 779.12 - General environmental resources information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that individual permits for mining will be sought; and (b)(1) The nature of cultural, historic and... archeological sites within the proposed permit and adjacent areas. The description shall be based on all... Officer and from local archeological, historical, and cultural preservation agencies. (2) The regulatory...

  5. 30 CFR 779.12 - General environmental resources information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that individual permits for mining will be sought; and (b)(1) The nature of cultural, historic and... archeological sites within the proposed permit and adjacent areas. The description shall be based on all... Officer and from local archeological, historical, and cultural preservation agencies. (2) The regulatory...

  6. Investigation and demonstration of turbidity reduction in stormwater runoff for Oklahoma highway construction sites : final report.

    DOT National Transportation Integrated Search

    2013-12-01

    The Environmental protection Agency (USEPA) has issued new requirements on the construction industry to control the discharge of pollutants from the sites. The construction effluent guidelines or ELGs require construction sites to reduce the pollu...

  7. BP America Treating Site #9 Compressor Station... Status of PSD and Title V permits following decommissioning of site

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. The Dust Bowl in the American West: A geochemical record of dust provenance and deposition in the Upper Fremont Glacier ice core

    NASA Astrophysics Data System (ADS)

    Andrus, C. F. T.; Bassett, C.; Black, H. D.; Payne, T. N.

    2016-12-01

    Several recent studies demonstrate that nitrogen isotope analysis of the organic fraction of mollusk shells can serve as a proxy for anthropogenic environmental impacts, including sewage input into estuaries. Analysis of δ15N in shells from archaeological sites permits construction of time-series proxy data from the present day to pre-industrial times, yielding insight into the history of some human environmental influences such as waste input and land use changes. Most such studies utilize a single bulk analysis per valve, combining shell material grown over time periods of one or more years. However, large, fast-growing species (e.g. some scallops and abalone) may permit sub-annual sampling, potentially yielding insight into seasonal processes. Such sclerochronological sampling of archaeological shells may enable researchers to detect variation at a finer temporal scale than has been attempted to date, which in turn may facilitate analysis of seasonal resource procurement strategies and related actions. This presentation will incorporate new and published data from the Atlantic, Pacific and Gulf of Mexico coasts of North America to assess how sclerochronological δ15N data can be useful to better understand pre-industrial human-environmental interaction and change, and also address diagenesis and other preservational concerns commonly found in archaeological samples.

  9. Nitrogen Isotope Analyses in Mollusk Shell: Applications to Environmental Sciences and Archaeology.

    NASA Astrophysics Data System (ADS)

    Andrus, C. F. T.; Bassett, C.; Black, H. D.; Payne, T. N.

    2017-12-01

    Several recent studies demonstrate that nitrogen isotope analysis of the organic fraction of mollusk shells can serve as a proxy for anthropogenic environmental impacts, including sewage input into estuaries. Analysis of δ15N in shells from archaeological sites permits construction of time-series proxy data from the present day to pre-industrial times, yielding insight into the history of some human environmental influences such as waste input and land use changes. Most such studies utilize a single bulk analysis per valve, combining shell material grown over time periods of one or more years. However, large, fast-growing species (e.g. some scallops and abalone) may permit sub-annual sampling, potentially yielding insight into seasonal processes. Such sclerochronological sampling of archaeological shells may enable researchers to detect variation at a finer temporal scale than has been attempted to date, which in turn may facilitate analysis of seasonal resource procurement strategies and related actions. This presentation will incorporate new and published data from the Atlantic, Pacific and Gulf of Mexico coasts of North America to assess how sclerochronological δ15N data can be useful to better understand pre-industrial human-environmental interaction and change, and also address diagenesis and other preservational concerns commonly found in archaeological samples.

  10. 10 CFR 100.23 - Geologic and seismic siting criteria.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Earthquake Ground Motion, and to permit adequate engineering solutions to actual or potential geologic and..., earthquake recurrence rates, fault geometry and slip rates, site foundation material, and seismically induced... Earthquake Ground Motion for the site, the potential for surface tectonic and nontectonic deformations, the...

  11. 10 CFR 100.23 - Geologic and seismic siting criteria.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Earthquake Ground Motion, and to permit adequate engineering solutions to actual or potential geologic and..., earthquake recurrence rates, fault geometry and slip rates, site foundation material, and seismically induced... Earthquake Ground Motion for the site, the potential for surface tectonic and nontectonic deformations, the...

  12. 10 CFR 100.23 - Geologic and seismic siting criteria.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Earthquake Ground Motion, and to permit adequate engineering solutions to actual or potential geologic and..., earthquake recurrence rates, fault geometry and slip rates, site foundation material, and seismically induced... Earthquake Ground Motion for the site, the potential for surface tectonic and nontectonic deformations, the...

  13. 24 CFR 954.303 - Eligible project costs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., improvements necessary to permit the use by handicapped persons, and the abatement of lead-based paint hazards... the site improvements may be charged against the HOME grant. Site improvements include roads, streets...

  14. December 30, 2003 Petition Requesting the Administrator Object to Chemical Lime Company's and Granite Construction Company's Apex Facility's Title V Permit

    EPA Pesticide Factsheets

    This document may be of assistance in applying the Title V air operating permit regulations. This document is part of the Title V Petition Database available at www2.epa.gov/title-v-operating-permits/title-v-petition-database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  15. 50 CFR 622.220 - Permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Coral, Coral Reefs, and... take or possess fish or other marine organisms with an allowable chemical in a coral area, other than... or possessing live rock from an aquacultured live rock site. (4) Prohibited coral. A Federal permit...

  16. 50 CFR 622.220 - Permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE CARIBBEAN, GULF OF MEXICO, AND SOUTH ATLANTIC Coral, Coral Reefs, and... take or possess fish or other marine organisms with an allowable chemical in a coral area, other than... or possessing live rock from an aquacultured live rock site. (4) Prohibited coral. A Federal permit...

  17. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...

  18. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...

  19. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...

  20. 40 CFR 270.110 - What must I include in my application for a RAP?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM... EPA identification number of the remediation waste management site; (b) The name, address, and... States Geological Survey (USGS) or county map showing the location of the remediation waste management...