Sample records for small hydro projects

  1. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysismore » and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)« less

  2. Tapping rocks for Terror Lake hydro project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sieber, O.V.

    The Terror Lake hydro project in Alaska is described. Terror Lake is a small alpine lake surrounded by barren glacier-scoured, rocky mountain tops and plateaus that do not retain moisture. The method for obtaining more water for the hydro project in Kodiak is unique. The basic program was to dam up the outlet of Terror Lake and raise the water level 170 ft. from approximately 1250 ft. above sea level to 1420 ft. Although the megawatt output of the project is small, the concept of the Terror Lake Project has an epic scale to it.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rehder, J.B.

    The project focuses on an appropriate technology for small-scale hydro power: floating waterwheels and turbines. For background, relic and existing systems such as early floating mills, traditional Amish waterwheels, and micro-hydro systems are examined. In the design phase of the project, new designs for Floating Hydro Power Systems include: an analysis of floatation materials and systems; a floating undershot waterwheel design; a floating cylinder (fiberglass storage tank) design; a submerged tube design; and a design for a floating platform with submerged propellers. Finally, in the applications phase, stream flow data from East Tennessee streams are used in a discussion ofmore » the potential applications of floating hydro power systems in small streams.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    One of the early bases that must be covered in the development of a potential small hydro site is a visit to the bank. According to Jacques P. Fiechter, a Senior Vice President with BayBank Boston, small-scale hydro financing, when properly done, is a particularly productive use of a bank's funds. Mr. Fiechter does not consider himself a hydro-expert, but with ten years of experience as a lending generalist and recent experience with several hydro projects, he describes what he likes to see in any loan application coming in.

  5. Small-Scale Hydroelectric Power in the Southwest: New Impetus for an old Energy Source

    NASA Astrophysics Data System (ADS)

    1980-06-01

    A forum was provided for state legislators and other interested persons to discuss the problems facing small scale hydro developers, and to recommend appropriate solutions to resolve those problems. Alternative policy options were recommended for consideration by both state and federal agencies. Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small scale hydro projects. Legislative resolution of the problems and delays in small scale hydro licensing and development were also stressed.

  6. Hydropower, an energy source whose time has come again

    NASA Astrophysics Data System (ADS)

    1980-01-01

    Recent price increases in imported oil demonstrate the urgency for the U.S. to rapidly develop its renewable resources. One such renewable resource for which technology is available now is hydropower. Studies indicate that hydropower potential, particularly at existing dam sites, can save the county hundreds of thousands of barrels of oil per day. But problems and constraints-economic, environmental, institutional, and operational-limit is full potential. Federal programs have had little impact on helping to bring hydro projects on line. Specifically, the Department of Energy's Small Hydro Program could do more to overcome hydro constraints and problems through an effective outreach program and more emphasis on demonstration projects.

  7. Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, Abraham; Schneider, Gia; McKinstry, Katherine

    Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or abovemore » tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-­head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.« less

  8. On the monitoring and prediction of flash floods in small and medium-sized catchments - the EXTRUSO project

    NASA Astrophysics Data System (ADS)

    Wiemann, Stefan; Eltner, Anette; Sardemann, Hannes; Spieler, Diana; Singer, Thomas; Thanh Luong, Thi; Janabi, Firas Al; Schütze, Niels; Bernard, Lars; Bernhofer, Christian; Maas, Hans-Gerd

    2017-04-01

    Flash floods regularly cause severe socio-economic damage worldwide. In parallel, climate change is very likely to increase the number of such events, due to an increasing frequency of extreme precipitation events (EASAC 2013). Whereas recent work primarily addresses the resilience of large catchment areas, the major impact of hydro-meteorological extremes caused by heavy precipitation is on small areas. Those are very difficult to observe and predict, due to sparse monitoring networks and only few means for hydro-meteorological modelling, especially in small catchment areas. The objective of the EXTRUSO project is to identify and implement appropriate means to close this gap by an interdisciplinary approach, combining comprehensive research expertise from meteorology, hydrology, photogrammetry and geoinformatics. The project targets innovative techniques for achieving spatio-temporal densified monitoring and simulations for the analysis, prediction and warning of local hydro-meteorological extreme events. The following four aspects are of particular interest: 1. The monitoring, analysis and combination of relevant hydro-meteorological parameters from various sources, including existing monitoring networks, ground radar, specific low-cost sensors and crowdsourcing. 2. The determination of relevant hydro-morphological parameters from different photogrammetric sensors (e.g. camera, laser scanner) and sensor platforms (e.g. UAV (unmanned aerial vehicle) and UWV (unmanned water vehicle)). 3. The continuous hydro-meteorological modelling of precipitation, soil moisture and water flows by means of conceptual and data-driven modelling. 4. The development of a collaborative, web-based service infrastructure as an information and communication point, especially in the case of an extreme event. There are three major applications for the planned information system: First, the warning of local extreme events for the population in potentially affected areas, second, the support for decision makers and emergency responders in the case of an event and, third, the development of open, interoperable tools for other researchers to be applied and further developed. The test area of the project is the Free State of Saxony (Germany) with a number of small and medium catchment areas. However, the whole system, comprising models, tools and sensor setups, is planned to be transferred and tested in other areas, within and outside Europe, as well. The team working on the project consists of eight researchers, including five PhD students and three postdocs. The EXTRUSO project is funded by the European Social Fund (ESF grant nr. 100270097) with a project duration of three years until June 2019. EASAC (2013): Trends in extreme weather events in Europe: implications for national and European Union adaption strategies. European Academies Science Advisory Council. Policy report 22, November 2013 The EXTRUSO project is funded by the European Social Fund (ESF), grant nr. 100270097

  9. DEVELOPMENT OF COMMUNITY POWER FROM SUSTAINABLE SMALL HYDRO POWER SYSTEMS – A CAPACITY BUILDING PROJECT IN BANGANG, CAMEROON

    EPA Science Inventory

    The hydro-turbine developed in Phase I will be fabricated on-site in Bangang, Cameroon using locally sourced materials. Data of the performance tests will be collected and analyzed using appropriate engineering analysis tools. A second trip will be planned for extensive testin...

  10. 77 FR 9230 - Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14131-000; Project No. 14138-000; Project No. 14135-000] Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified... Hydro No. 1, LLC for Project No. 14131-000, Lock+ Hydro Friends Fund XXXVII for Project No. 14138- 000...

  11. Earthquake design criteria for small hydro projects in the Philippines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martin, P.P.; McCandless, D.H.; Asce, M.

    1995-12-31

    The definition of the seismic environment and seismic design criteria of more than twenty small hydro projects in the northern part of the island of Luzon in the Philippines took a special urgency on the wake of the Magnitude 7.7 earthquake that shook the island on July 17, 1990. The paper describes the approach followed to determine design shaking level criteria at each hydro site consistent with the seismic environment estimated at that same site. The approach consisted of three steps: (1) Seismicity: understanding the mechanisms and tectonic features susceptible to generate seismicity and estimating the associated seismicity levels, (2)more » Seismic Hazard: in the absence of an accurate historical record, using statistics to determine the expected level of ground shaking at a site during the operational 100-year design life of each Project, and (3) Criteria Selection: finally and most importantly, exercising judgment in estimating the final proposed level of shaking at each site. The resulting characteristics of estimated seismicity and seismic hazard and the proposed final earthquake design criteria are provided.« less

  12. 76 FR 6612 - Lock+ Hydro Friends Fund XL; FFP Missouri 4, LLC; Allegheny 4 Hydro, LLC; Three Rivers Hydro, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13746-000; Project No. 13750-000; Project No. 13776-000; Project No. 13782-000] Lock+ Hydro Friends Fund XL; FFP Missouri 4..., LLC--Project No. 13750-000 3. Allegheny 4 Hydro, LLC--Project No. 13776-000 4. Lock+ Hydro Friends...

  13. 77 FR 13316 - FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000, 14279-000, 14282-000] FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice.... 2. Riverbank Hydro No. 23, LLC: Project No. 14279-000. 3. Lock+ Hydro Friends Fund III: Project No...

  14. Renewable energy projects in the Dominican Republic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Viani, B.

    1997-12-01

    This paper describes a US/Dominican Republic program to develop renewable energy projects in the country. The objective is to demonstrate the commercial viability of renewable energy generation projects, primarily small-scale wind and hydropower. Preliminary studies are completed for three micro-hydro projects with a total capacity of 262 kWe, and two small wind power projects for water pumping. In addition wind resource assessment is ongoing, and professional training and technical assistance to potential investors is ongoing. Projects goals include not less than ten small firms actively involved in installation of such systems by September 1998.

  15. 76 FR 74779 - SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000; 14299-000; 14301-000; 14302-000] SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV... (Coffeeville), FFP Project 99 LLC (FFP 99), and Lock Hydro Friends Fund XIV (Lock Hydro) filed preliminary...

  16. 76 FR 67720 - Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14136-000; Project No. 14139-000] Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority... follows: 1. Lock+ Hydro Friends Fund XXXV--Project No. 14136-000 2. Riverbank Hydro No. 4, LLC--Project No...

  17. 76 FR 67168 - Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14176-000, 14188-000, 14200-000] Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 59 LLC (FFP 59) filed preliminary permit...

  18. 76 FR 67172 - Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14167-000, 14185-000 and 14196-000] Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund IV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  19. 76 FR 67169 - Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14164-000; 14189-000; 14198-000] Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing... Hydro Friends Fund XL (Lock Hydro), and FFP Project 56 LLC (FFP 56) filed preliminary permit...

  20. 76 FR 67176 - Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14168-000, 14187-000 and 14199-000] Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  1. 76 FR 67167 - Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14172-000, 14178-000 and 14190-000] Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of..., Lock Hydro Friends Fund XLVII (Lock Hydro), and FFP Project 52 LLC (FFP 52) filed preliminary permit...

  2. 77 FR 11530 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice.... 2, LLC for Project No. 14130-000, Lock+ Hydro Friends Fund XXXVI for Project No. 14137-000, and...

  3. 75 FR 73064 - Lock Hydro Friends Fund XLI; Allegheny 7 Hydro, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    .... 13777-000] Lock Hydro Friends Fund XLI; Allegheny 7 Hydro, LLC; Notice of Competing Preliminary Permit..., 2010, Lock Hydro Friends Fund XLI, and Allegheny 7 Hydro, LLC filed applications, pursuant to section 4.... 7 Projects Lock Hydro Friends Fund XLI's project (Project No. 13736-000) would consist of: (1) Two...

  4. 77 FR 13317 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC.... Lock+ Hydro Friends Fund XVIII: Project No. 14261-000. 2. Riverbank Hydro No. 25, LLC: Project No...

  5. 75 FR 71104 - Lock Hydro Friends Fund XXXV; FFP Missouri 7, LLC; Dashields Hydro, LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    .... 13735-000; Project No. 13756-000; Project No. 13779-000] Lock Hydro Friends Fund XXXV; FFP Missouri 7... Soliciting Comments, and Motions To Intervene November 15, 2010. On May 18, 2010, Lock Hydro Friends Fund.... Descriptions of the proposed Dashields Lock and Dam Projects: Lock Hydro Friends Fund XXXV's project (Project...

  6. 76 FR 73612 - Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC; Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000; 14268-000; 14277-000; 14281-000] Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC... Friends Fund XVIII (Lock Hydro), Upper Hydroelectric LLC (Upper Hydro), Riverbank Hydro No. 25 LLC...

  7. Black Creek Hydro Project high-line cable penstock installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fonnesbeck, K.C.; Ellicock, R.

    1995-12-31

    The Black Creek Hydro Project is a remote, high head, run-of-river, small hydro project located near Seattle, Washington. The comparatively small size of this project was not indicative of the difficulties and challenges presented to the design engineers and construction contractors involved in it`s completion. The most difficult of these challenges was the design and installation of a buried penstock on very steep and heavily forested terrain. This paper will concentrate on construction of the Black Creek penstock, and specifically, that portion of the penstock which required innovative application of a suspended {open_quotes}high-line{close_quotes} cable operation as used is commonly formore » logging of steep slopes. For this project, the cable installation and yarder equipment were utilized for a variety of purposes including, clearing and logging of the slope, to secure heavy equipment and machinery required to excavate the penstock trench, transport and placement of the individual pipe joints and finally to encase the pipe with lean concrete. The successful application of this approach contributed greatly to the timely completion of the project. This paper will offer background information on the selection and design of the cable Installation as well as highlights of the solutions that were developed to overcome the design and construction problems encountered. Finally, cost data will be offered to those who may be faced with similar undertakings caused by the steep and difficult sites attracting more attention in present days.« less

  8. 77 FR 10740 - Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000, 14276-000, 14280-000] Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice... Counties, Kentucky. The applications were filed by Lock+ Hydro Friends Fund VIII for Project No. 14262-000...

  9. 76 FR 73616 - Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000; 14276-000; 14280-000] Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of..., and Competing Applications On September 1, 2011, Lock Hydro Friends Fund VIII (Lock Hydro), FFP...

  10. 76 FR 73615 - FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000; 14279-000; 14282-000] FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of... LLC (Riverbank), and Lock Hydro Friends Fund III (Lock Hydro), filed preliminary permit applications...

  11. 75 FR 75999 - Lock + Hydro Friends Fund XlVI; FFP Missouri 17, LLC; Solia 3 Hydroelectric, LLC; Three Rivers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    .... 13754-000; Project No. 13765-000; Project No. 13783-000; Project No. 13790-000] Lock + Hydro Friends..., and Motions To Intervene NOVEMBER 30, 2010. On May 18, 2010, Lock + Hydro Friends Fund XLVI, FFP... proposed Hildebrand Lock & Dam Projects: Lock+ Hydro Friends Fund XLVI's project (Project No. 13734-000...

  12. 76 FR 65720 - Lock+ Hydro Friends Fund XXXV, Riverbank Hydro No. 4, LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14136-000; Project No. 14139-000] Lock+ Hydro Friends Fund XXXV, Riverbank Hydro No. 4, LLC; Notice Announcing Preliminary... County, Wisconsin.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14136...

  13. A Comparison of Prediction Methods for Design of Pump as Turbine for Small Hydro Plant: Implemented Plant

    NASA Astrophysics Data System (ADS)

    Naeimi, Hossein; Nayebi Shahabi, Mina; Mohammadi, Sohrab

    2017-08-01

    In developing countries, small and micro hydropower plants are very effective source for electricity generation with energy pay-back time (EPBT) less than other conventional electricity generation systems. Using pump as turbine (PAT) is an attractive, significant and cost-effective alternative. Pump manufacturers do not normally provide the characteristic curves of their pumps working as turbines. Therefore, choosing an appropriate Pump to work as a turbine is essential in implementing the small-hydro plants. In this paper, in order to find the best fitting method to choose a PAT, the results of a small-hydro plant implemented on the by-pass of a Pressure Reducing Valve (PRV) in Urmia city in Iran are presented. Some of the prediction methods of Best Efficiency Point of PATs are derived. Then, the results of implemented project have been compared to the prediction methods results and the deviation of from measured data were considered and discussed and the best method that predicts the specifications of PAT more accurately determined. Finally, the energy pay-back time for the plant is calculated.

  14. 77 FR 13317 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice... drawing, the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVI: Project No. 14137-000. 2...

  15. 77 FR 12280 - Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000, 14138-00, 14135-000] Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice..., the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVII, Project No. 14138-000. 2...

  16. 77 FR 10741 - Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project 96, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000, 14264-000, 14267-000, 14273-000] Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project... Greene and Hale counties, Alabama. The applications were filed by Lock+ Hydro Friends Fund XII for...

  17. 76 FR 73614 - Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000; 14264-000; 14267-000; 14273-000] Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96..., Motions To Intervene, and Competing Applications On September 1, 2011, Lock Hydro Friends Fund XII (Lock...

  18. 78 FR 929 - TransCanada Hydro Northeast Inc.; FirstLight Hydro Generating Company; Notice of Intent To File...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... P-1904-073; Project Nos. P- 1889-081 and P-2485-063] TransCanada Hydro Northeast Inc.; FirstLight.... Submitted By: TransCanada Hydro Northeast Inc. (P-1892-026, P- 1855-045, and P-1904-073); FirstLight Hydro... Projects--John S. Howard, Director--FERC Hydro Compliance, FirstLight Hydro Generating Company, Northfield...

  19. Design and development of hybrid energy generator (photovoltaics) with solar tracker

    NASA Astrophysics Data System (ADS)

    Mohiuddin, A. K. M.; Sabarudin, Mohamad Syabil Bin; Khan, Ahsan Ali; Izan Ihsan, Sany

    2017-03-01

    This paper is the outcome of a small scale hybrid energy generator (hydro and photovoltaic) project. It contains the photovoltaics part of the project. The demand of energy resources is increasing day by day. That is why people nowadays tend to move on and changes their energy usage from using fossil fuels to a cleaner and green energy like hydro energy, solar energy etc. Nevertheless, energy is hard to come by for people who live in remote areas and also campsites in the remote areas which need continuous energy sources to power the facilities. Thus, the purpose of this project is to design and develop a small scale hybrid energy generator to help people that are in need of power. This main objective of this project is to develop and analyze the effectiveness of solar trackers in order to increase the electricity generation from solar energy. Software like Solidworks and Arduino is used to sketch and construct the design and also to program the microcontroller respectively. Experimental results show the effectiveness of the designed solar tracker sytem.

  20. 75 FR 48664 - Turnbull Hydro, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12597-021; Project No. 12598-019] Turnbull Hydro, LLC; Notice of Availability of Environmental Assessment August 4, 2010. In... Register [FR] 47897), the Office of Energy Projects has reviewed Turnbull Hydro, LLC's (Turnbull Hydro's...

  1. 77 FR 13317 - Notice Announcing Filing Priority for Preliminary Permit Applications: Lock+ Hydro Friends Fund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... Applications: Lock+ Hydro Friends Fund VIII; FFP Project 92, LLC; Riverbank Hydro No. 24, LLC On February 28.... 14276-000. 2. Riverbank Hydro No. 24, LLC: Project No. 14280-000. 3. Lock+ Hydro Friends Fund VIII...

  2. Investigation of Surface Phenomena in Shocked Tin in Converging Geometry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rousculp, Christopher L.; Oro, David Michael; Griego, Jeffrey Randall

    2016-04-14

    There is a great interest in RMI as source of ejecta from metal shells. Previous experiments have explored wavelength amplitude (kA) variation but they have a small range of drive pressures and are in planer geometry. Simulations, both MD and hydro, have explored RMI in planer geometry. The ejecta source model from RMI is an area of active algorithm and code development in ASCI-IC Lagrangian Applications Project. PHELIX offers precise, reproducible variable driver for Hydro and material physics diagnoses with proton radiography.

  3. 76 FR 67171 - Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund XLIII; FFP Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14163-000; 14174-000; 14181-000; 14195-000] Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund... LLC (Solia), and Riverbank Hydro No. 20 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  4. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...

  5. 77 FR 25715 - Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 13010-002; Project No., 14272-000] Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for.... Mississippi 8 Hydro, LLC--Project No. 13010-002. 2. FFP Project 98, LLC--Project No. 14272-000. Dated: April...

  6. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  7. 77 FR 10740 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC...-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund...

  8. 76 FR 4892 - Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three Rivers Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13740-000, 13749-000, 13775-000, 13781-000] Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three..., Pennsylvania.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XXXIX, for Project No. 13740-000, FFP...

  9. 76 FR 67169 - Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI FFP Project 54...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14162-000; 14173-000; 14182-000; 14192-000] Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI... LLC (Solia), and Riverbank Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  10. 76 FR 67172 - Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [14160-000; 14179-000; 14194-000] Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing Preliminary... Applications On May 2, 2011, Riverbank Hydro No. 8 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  11. 77 FR 56637 - FirstLight Hydro Generating Company; Notice of Authorization for Continued Project Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-000] FirstLight Hydro...Light Hydro Generating Company, licensee for the Scotland Hydroelectric Project, filed an Application... license for Project No. 2662 [[Page 56638

  12. 77 FR 9232 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14186-000 and FFP Project...

  13. 77 FR 9915 - Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14179-000; Project No. 14194-000] Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XLIV for Project No. 14179-000 and FFP Project...

  14. 77 FR 12281 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14181-000; Project No. 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XLIII, Project No. 14181-000. 2. FFP Project 53, LLC, Project No...

  15. 77 FR 12280 - Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14182-000; Project No. 14192-000] Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 54, LLC, Project No. 14192-000. 2. Lock+ Hydro Friends Fund XLI, Project No. 14182...

  16. 77 FR 12280 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC;Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXV, Project No. 14186-000. 2. FFP Project 57, LLC, Project No...

  17. 77 FR 12279 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14184-000; Project No. 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXVIII, Project No. 14184-000. 2. FFP Project 1, LLC, Project No...

  18. 77 FR 9916 - Riverbank Hydro No. 2, LLC; Lock+ Hydro Friends Fund XXXVI; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000; 14137-000] Riverbank Hydro No. 2, LLC; Lock+ Hydro Friends Fund XXXVI; Notice Announcing Preliminary Permit Drawing The...+ Hydro Friends Fund XXXVI for Project No. 14137-000. \\1\\ Under the Commission's Rules of Practice and...

  19. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14269-000; 14270-000] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The... Riverbank Hydro No. 22, LLC for Project No. 14269-000, and FFP Project 93, LLC for Project No. 14270-000. \\1...

  20. 77 FR 14775 - Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000, 14193-000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLV Project No. 14180-000. 2. FFP Project 2, LLC Project No. 14193-000. Dated: March...

  1. 77 FR 12280 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000, 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XL, Project No. 14189-000. 2. FFP Project 56, LLC, Project No. 14198-000. Dated...

  2. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14184-000; 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The... filed by Lock+ Hydro Friends Fund XXXVIII for Project No. 14184-000 and FFP Project 1, LLC for Project...

  3. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000; 14193-000] Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... filed by Lock+ Hydro Friends Fund XLV for Project No. 14180-000 and FFP Project 2, LLC for Project No...

  4. 77 FR 12280 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-00o, 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for Preliminary Permit.... FFP Project 59, LLC, Project No. 14200-000. 2. Lock+ Hydro Friends Fund XXXVIII, Project No. 14188-000...

  5. 77 FR 12279 - Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14178-000, 14190-000] Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLVII, Project No. 14178-000. 2. FFP Project 52, LLC, Project No. 14190-000. Dated...

  6. 77 FR 12281 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14187-000, 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XXXIV, Project No. 14187-000. 2. FFP Project 58, LLC, Project No. 14199-000. Dated...

  7. 77 FR 12279 - Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14179-000, 14194-000] Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLIV, Project No. 14179-000. 2. FFP Project 51, LLC, Project No. 14194-000. Dated...

  8. 77 FR 13318 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000, 14299-000, 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 99, LLC: Project No. 14301-000. 2. SV Hydro, LLC: Project No. 14298-000. 3...

  9. 77 FR 12281 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14185-000; Project No. 14196-000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit... County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV for Project No. 14185-000...

  10. 77 FR 9230 - Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 14178-000; Project No. 14190-000] Lock+ Hydro Friends Fund XLVII; FFP Project 52, LLC; Notice Announcing Preliminary Permit... County, Arkansas. The applications were filed by Lock+ Hydro Friends Fund XLVII for Project No. 14178-000...

  11. 77 FR 9232 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14187-000; Project No. 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Preliminary Permit... County, Kentucky. The applications were filed by Lock+ Hydro Friends Fund XXXIV for Project No. 14187-000...

  12. 75 FR 14437 - North Eastern Wisconsin Hydro Inc. (N.E.W. Hydro); Notice of Intent To File License Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... Wisconsin Hydro Inc. (N.E.W. Hydro); Notice of Intent To File License Application, Filing of Pre-Application..., Inc. (N.E.W. Hydro) e. Name of Project: Menominee/Park Mill Hydroelectric Project. f. Location: The..., (202) 502-6156 or by e-mail at [email protected] . j. N.E.W. Hydro filed its request to use the...

  13. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  14. 77 FR 13317 - Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... al.] Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for Preliminary Permit Applications Project No. Lock+ Hydro Friends Fund XII 14260-000 BOST2, LLC 14264-000.... 2. BOST2, LLC: Project No. 14264-000. 3. Lock+ Hydro Friends Fund XII: Project No. 14260-000. 4...

  15. 76 FR 79675 - Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting On January 18, 2012, Office of Energy Projects staff will hold a site visit and technical meeting for the proposed Pomperaug Hydro Project (FERC...

  16. 77 FR 9230 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14181-000; 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Preliminary Permit Drawing The... applications were filed by Lock+ Hydro Friends Fund XLIII for Project No. 14181-000, and FFP Project 53, LLC...

  17. 77 FR 9231 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000; 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Preliminary Permit Drawing The Commission... applications were filed by Lock+ Hydro Friends Fund XL for Project No. 14189-000 and FFP Project 56, LLC for...

  18. 76 FR 6612 - Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4 Hydroelectric, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13745-000; Project No. 13758-000; Project No. 13767-000] Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4... Hydroelectric, LLC--Project No. 13767-000 2. FFP Missouri 14, LLC--Project No. 13758-000 3. Lock Hydro Friends...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leathe, Stephen A.; Enk, Michael D.

    This study was designed to develop and apply methods to evaluate the cumulative effects of 20 proposed small hydro projects on the fisheries resources of the Swan River drainage located in northwestern Montana. Fish population and reach classification information was used to estimate total populations of 107,000 brook trout, 65,000 cut-throat trout and 31,000 juvenile bull trout within the tributary system. Distribution, abundance, and life history of fish species in the drainage and their contribution to the sport fishery were considered in the cumulative impact analysis. Bull trout were chosen as the primary species of concern because of their extensivemore » use of project areas, sensitivity to streambed sedimentation, and their importance to the lake and river sport fisheries. Dewatering of hydroelectric diversion zones and streambed sedimentation (resulting from forest and small hydro development) were the major impacts considered. The developer proposed to divert up to the entire streamflow during low flow months because maintenance of recommended minimum bypass flows would not allow profitable project operation. Dewatering was assumed to result in a total loss of fish production in these areas. 105 refs., 19 figs., 38 tabs.« less

  20. A critical view on the eco-friendliness of small hydroelectric installations.

    PubMed

    Premalatha, M; Tabassum-Abbasi; Abbasi, Tasneem; Abbasi, S A

    2014-05-15

    Renewable energy sources are widely perceived as 'clean', 'green', and 'inexhaustible'. In recent years the spectre of global warming and ocean acidification, which has been primarily attributed to fossil fuel burning, has brought renewable energy at the forefront of most climate change mitigation strategies. There is strong advocacy for large-scale substitution of conventional energy sources with the renewables on the premise that such a move would substantially reduce environmental degradation and global warming. These sentiments are being echoed by scientists and policy makers as well as environmental activists all over the world. 'Small hydro', which generally represents hydroelectric power projects of capacities 25 MW or lower, is one of the renewable energy options which is believed to be clean and sustainable even as its bigger version, large hydro, is known to cause several strongly adverse environmental impacts. This paper brings out that the prevailing perception of 'eco-friendliness' of small hydro is mainly due to the fact that it has only been used to a very small extent so far. But once it is deployed at a scale comparable to fossil fuel use, the resulting impacts would be quite substantially adverse. The purpose is not to denegrade small hydro, less so to advocate use of fossil fuels. It, rather, is to bring home the point that a much more realistic and elaborate assessment of the likely direct as well as indirect impacts of extensive utilization of this energy source than has been done hitherto is necessary. Copyright © 2013 Elsevier B.V. All rights reserved.

  1. 77 FR 55466 - Barren River Lake Hydro LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13022-003] Barren River Lake Hydro LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric..., 2012. d. Applicant: Barren River Lake Hydro LLC (Barren River Hydro). e. Name of Project: Barren River...

  2. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  3. 77 FR 9231 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-000; 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Preliminary Permit Drawing The.... The applications were filed by Lock+ Hydro Friends Fund XXVIII for Project No. 14188-000 and FFP...

  4. 76 FR 67177 - Riverbank Hydro No. 18 LLC, Lock Hydro Friends Fund XXXV, FFP Project 57 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ...-000] Riverbank Hydro No. 18 LLC, Lock Hydro Friends Fund XXXV, FFP Project 57 LLC; Notice of Competing... Competing Applications On May 2, 2011, Riverbank Hydro No. 18 LLC (Riverbank), and on May 3, 2011, Lock... notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments...

  5. High Resolution Hydro-climatological Projections for Western Canada

    NASA Astrophysics Data System (ADS)

    Erler, Andre Richard

    Accurate identification of the impact of global warming on water resources and hydro-climatic extremes represents a significant challenge to the understanding of climate change on the regional scale. Here an analysis of hydro-climatic changes in western Canada is presented, with specific focus on the Fraser and Athabasca River basins and on changes in hydro-climatic extremes. The analysis is based on a suite of simulations designed to characterize internal variability, as well as model uncertainty. A small ensemble of Community Earth System Model version 1 (CESM1) simulations was employed to generate global climate projections, which were downscaled to 10 km resolution using the Weather Research and Forecasting model (WRF V3.4.1) with several sets of physical parameterizations. Downscaling was performed for a historical validation period and a mid- and end-21st-century projection period, using the RCP8.5 greenhouse gas trajectory. Daily station observations and monthly gridded datasets were used for validation. Changes in hydro-climatic extremes are characterized using Extreme Value Analysis. A novel method of aggregating data from climatologically similar stations was employed to increase the statistical power of the analysis. Changes in mean and extreme precipitation are found to differ strongly between seasons and regions, but (relative) changes in extremes generally follow changes in the (seasonal) mean. At the end of the 21st century, precipitation and precipitation extremes are projected to increase by 30% at the coast in fall and land-inwards in winter, while the projected increase in summer precipitation is smaller and changes in extremes are often not statistically significant. Reasons for the differences between seasons, the role of precipitation recycling in atmospheric water transport, and the sensitivity to physics parameterizations are discussed. Major changes are projected for the Fraser River basin, including earlier snowmelt and a 50% reduction in peak runoff. Combined with higher evapotranspiration, a significant increase in late summer drought risk is likely, but increasing fall precipitation might also increase the risk of moderate flooding. In the Athabasca River basin, increasing winter precipitation and snowmelt is balanced by increasing evapotranspiration in summer and no significant change in flood or drought risk is projected.

  6. 77 FR 9231 - Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000; 14196-000] Lock+ Hydro Friends Fund IV; FFP Project 55, LLC; Notice Announcing Preliminary Permit Drawing The Commission..., Kentucky. The applications were filed by Lock+ Hydro Friends Fund IV for Project No. 14185-000 and FFP...

  7. 78 FR 44105 - Monroe Hydro, LLC; Notice of Intent to File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14430-000] Monroe Hydro... Application and Request to Use the Traditional Licensing Process. b. Project No.: 14430-000 c. Date Filed: April 2, 2013 d. Submitted By: Monroe Hydro, LLC e. Name of Project: Monroe Drop Hydroelectric Project f...

  8. 78 FR 62350 - FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13579-002; Project No. 14491-000] FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing... applications were filed by FFP Qualified Hydro 14, LLC for Project No. 13579-002 and Western Minnesota...

  9. Hydro-Quebec is at it again

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamilton, G.

    1993-12-31

    When New York governor Mario Cuomo pulled the plug on a purchase of 1,000 megawatts of power from Hydro-Quebec last June, the provincial utility talked tough. The cancellation, a senior Hydro-Quebec official claimed, would not jeopardize the future of its controversial Great Whale hydro project in the North. Bu Hydro-Quebec has quietly shoved Great Whale onto the back burner while an environmental review is underway. In the meantime the utility is barreling ahead with another mega-dam. The Ste. Marquerite project planned for north-eastern Quebec is modest by Hydro-Quebec standards, generating less than a third the power of Great Whale. Still,more » with an 880-megawatt power station and 190 square miles of reservoirs, it is one of the largest hydro projects on any drawing board in North America. Environmentalists say it is being pushed ahead without a serious study of its impacts. This article details the environmental impacts of the project, and the extended impacts, not yet accounted for.« less

  10. 76 FR 67167 - Riverbank Hydro No. 1 LLC; Qualified Hydro 20 LLC; Lock Hydro Friends Fund XXXVII; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000; 14135-000; 14138-000] Riverbank Hydro No. 1 LLC; Qualified Hydro 20 LLC; Lock Hydro Friends Fund XXXVII; Notice of... LLC (Qualified Hydro) and Lock Hydro Friends Fund XXXVI (Lock Hydro) filed preliminary permit...

  11. 76 FR 24471 - Qualified Hydro 26, LLC; Lock+ Hydro Friends Fund VII; Western Minnesota Municipal Power Agency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ...; 14113-000] Qualified Hydro 26, LLC; Lock+ Hydro Friends Fund VII; Western Minnesota Municipal Power... Hydro), Lock+ Hydro Friends Fund VII (Hydro Friends) and Western Minnesota Municipal Power Agency (WMMPA... 02114; (978) 283-2822. Hydro Friends' proposed Lock and Dam 11 Hydropower Project No. 14112 would...

  12. 75 FR 17403 - Great Bay Hydro Corporation; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2306-041] Great Bay Hydro.... b. Project No.: 2306-041. c. Date Filed: March 1, 2010. d. Applicant: Great Bay Hydro Corporation. e...-825r. h. Applicant Contact: Mr. William C. Rodgers, Director of Marketing, Great Bay Hydro Corporation...

  13. 77 FR 55202 - Oliver Hydro LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13005-003] Oliver Hydro LLC... filed: December 14, 2011. d. Applicant: Oliver Hydro LLC. e. Name of Project: William Bacon Oliver Lock... according to the following Hydro Licensing Schedule. Revisions to the schedule will be made as appropriate...

  14. 78 FR 71602 - Lock 12 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... Hydroelectric Project] Lock 12 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a... Hydro Partners, LLC, as the applicant for Project No. 13214-003, is invited to participate in... Kinloch, Lock 14 Hydro Partners, 414 South Wenzel St., Louisville, KY 40204. Any person on the official...

  15. 78 FR 12304 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Friends Fund XLII, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments...+ Hydro Friends Fund XLII, LLC. e. Name of Project: Braddock Locks and Dam Hydroelectric Project. f...\\ Hydro Friends Fund XLII, LLC, c/o Hydro Green Energy, LLC, 900 Oakmont Lane, Suite 310, Westmont, IL...

  16. 78 FR 62359 - Red River Hydro LLC; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-004] Red River Hydro... Projects has reviewed Red River Hydro LLC's application for an original license for the Overton Lock and... (EA). The project would be located on the Red River in Rapides Parish, Louisiana, at an existing lock...

  17. 78 FR 36767 - Red River Hydro LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-004] Red River Hydro... Projects has reviewed Red River Hydro LLC's application for an original license for the Overton Lock and... assessment (draft EA). The project would be located on the Red River in Rapides Parish, Louisiana, at an...

  18. 76 FR 4893 - FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13763-000; Project No. 13772-000] FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing January... No. 13763-000, and Grays Hydro, LLC, for Project No. 13772-000. \\1\\ The Commission is open each day...

  19. 77 FR 36531 - Yegua Mesa Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13315-001] Yegua Mesa Hydro... Intervene, and Competing Applications On May 2, 2012, Yegua Mesa Hydro, LLC, filed an application for a... studying the feasibility of the Yegua Mesa Pumped Storage Hydroelectric Project (Yegua Mesa Project or...

  20. 76 FR 1427 - Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13809-000; Project No. 13814-000] Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLVIII........ Project No. 13809-000...

  1. 78 FR 72879 - Western Minnesota Municipal Power Agency; Lock+ Hydro Friends Fund III, LLC; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14540-000; Project No. 14539-000] Western Minnesota Municipal Power Agency; Lock+ Hydro Friends Fund III, LLC; Notice.... 14540-000 2. Lock+ Hydro Friends Fund III, LLC Project No. 14539-000 Dated: November 26, 2013. Nathaniel...

  2. 76 FR 3626 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13808-000; Project No. 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Preliminary Permit..., near Augusta, Georgia.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XLIX, for Project No...

  3. 78 FR 26768 - Great Lakes Hydro America, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2520-072] Great Lakes Hydro...: March 1, 2013. d. Submitted By: Great Lakes Hydro America, LLC. e. Name of Project: Mattaceunk... Preservation at 36 CFR 800.2. l. With this notice, we are designating Great Lakes Hydro America, LLC as the...

  4. 78 FR 71603 - Lock 14 Hydro Partners, LLC; Notice of Proposed Restricted Service List for a Programmatic Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... Heidelberg Hydroelectric Project] Lock 14 Hydro Partners, LLC; Notice of Proposed Restricted Service List for... listed below. Lock 14 Hydro Partners, LLC, as the applicant for Project No. 13213-003, is invited to... Kinloch, Lock 14 Hydro Partners, 414 South Wenzel St., Louisville, KY 40204. Any person on the official...

  5. 77 FR 34371 - Red River Hydro LLC; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-004] Red River Hydro... Application: Original Major License. b. Project No.: 13160-004. c. Date Filed: May 24, 2012. d. Applicant: Red River Hydro LLC (Red River), a wholly-owned subsidiary of Symbiotics LLC. e. Name of Project: Overton...

  6. 76 FR 49462 - Red River Hydro LLC; Notice of Application Tendered For Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13160-002] Red River Hydro... Application: New Major License. b. Project No.: 13160-002. c. Date Filed: July 29, 2011. d. Applicant: Red River Hydro LLC (Red River), a wholly-owned subsidiary of Symbiotics LLC. e. Name of Project: Overton...

  7. 76 FR 4648 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13808-000; Project No. 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLIX: Project No. 13808-000. 2. FFP...

  8. Parametric distribution approach for flow availability in small hydro potential analysis

    NASA Astrophysics Data System (ADS)

    Abdullah, Samizee; Basri, Mohd Juhari Mat; Jamaluddin, Zahrul Zamri; Azrulhisham, Engku Ahmad; Othman, Jamel

    2016-10-01

    Small hydro system is one of the important sources of renewable energy and it has been recognized worldwide as clean energy sources. Small hydropower generation system uses the potential energy in flowing water to produce electricity is often questionable due to inconsistent and intermittent of power generated. Potential analysis of small hydro system which is mainly dependent on the availability of water requires the knowledge of water flow or stream flow distribution. This paper presented the possibility of applying Pearson system for stream flow availability distribution approximation in the small hydro system. By considering the stochastic nature of stream flow, the Pearson parametric distribution approximation was computed based on the significant characteristic of Pearson system applying direct correlation between the first four statistical moments of the distribution. The advantage of applying various statistical moments in small hydro potential analysis will have the ability to analyze the variation shapes of stream flow distribution.

  9. 78 FR 35624 - Shelbyville Hydro LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13011-003] Shelbyville Hydro LLC; Notice of Availability of Environmental Assessment In accordance with the National... of Energy Projects has reviewed Shelbyville Hydro LLC's application for an original license for the...

  10. 77 FR 37035 - Goose River Hydro, Inc.; Independence Hydro, LLC; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2804-027] Goose River Hydro, Inc.; Independence Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions to Intervene On June 6, 2012, Goose River Hydro, Inc. (transferor) and Independence Hydro...

  11. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000; 14137-000; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp...

  12. DEVELOPMENT OF COMMUNITY POWER FROM SUSTAINABLE SMALL HYDRO POWER SYSTEMS – ACAPACITY BUILDING PROJECT IN BANGANG, CAMEROON

    EPA Science Inventory

    Electric power is one of the basic needs for the development of any community. With electric power lacking in most rural communities in Africa, providing basic amenities that are dependent on power such as clean portable drinking water, powering equipment in health and dent...

  13. 77 FR 67359 - Wickiup Hydro Group, LLC, Oregon; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12965-002] Wickiup Hydro Group, LLC, Oregon; Notice of Availability of Environmental Assessment In accordance with the National... Projects has reviewed Wickiup Hydro Group, LLC's application for an original license for the Wickiup Dam...

  14. 77 FR 25999 - Wickiup Hydro Group, LLC; Oregon; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12965-002] Wickiup Hydro Group, LLC; Oregon; Notice of Availability of Environmental Assessment In accordance with the National... Projects has reviewed Wickiup Hydro Group, LLC's application for an original license for the Wickiup Dam...

  15. 77 FR 55468 - Oliver Hydro LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13005-003] Oliver Hydro LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been... License. b. Project No.: P-13005-003. c. Date filed: December 14, 2011. d. Applicant: Oliver Hydro LLC. e...

  16. 77 FR 58371 - Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National Association...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3021-088] Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National Association Allegheny Hydro, LLC... 31, 2012, Allegheny Hydro No. 8, L.P., Allegheny Hydro No. 9, L.P., and U.S. Bank National...

  17. 76 FR 67174 - Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14157-000; 14161-000; 14184-000] Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice.... 7 LLC (Riverbank) and on May 3, 2011, Lock Hydro Friends Fund XXXVIII (Lock Hydro) filed preliminary...

  18. 76 FR 67170 - Riverbank Hydro No. 12 LLC; Lock Hydro Friends Fund XXXVI; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14175-000; 14183-000] Riverbank Hydro No. 12 LLC; Lock Hydro Friends Fund XXXVI; Notice of Competing Preliminary Permit... May 2, 2011, Riverbank Hydro No. 12 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund XXXVI...

  19. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14298-000, Project No. 14299-000, Project No. 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice... Project No. 14299-000, and FFP Project 99, LLC for Project No. 14301-000.\\2\\ \\1\\ Under the Commission's...

  20. 75 FR 47808 - Verde Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13819-000] Verde Hydro, LLC... Intervene, and Competing Applications August 2, 2010. On July 21, 2010, Verde Hydro, LLC filed an... the feasibility of the Verde Hydroelectric Project, located in Maricopa County, in the State of...

  1. 78 FR 2985 - Moretown Hydro Energy Company; Ampersand Moretown Hydro, LLC; Notice of Application for Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5944-021] Moretown Hydro Energy Company; Ampersand Moretown Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On September 25, 2012, Moretown Hydro Energy Company (transferor...

  2. 76 FR 43998 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14064-000] Amnor Hydro West... Hydropower Project (Horn Rapids Project or project). The proposed project is located on the Yakima River... upon lands or waters owned by others without the owners' express permission. The proposed project would...

  3. 78 FR 53452 - Notice Announcing Filing Priority for Preliminary Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Lock+ Hydro Friends Fund XXX, LLC.. Project No. 13625-003 FFP Project 121, LLC.... FFP Project 121, LLC Project No. 14504-000 2. Lock+ Hydro Friends Fund XXX, LLC Project No. 13625-003...

  4. 78 FR 26342 - Small Hydro of Texas, Inc.; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ... Texas, Inc.; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and... Contact: Mr. Henry Woo, (202) 502-8872, [email protected] . j. Deadline for filing comments, motions to... the end of your comments. Please include the project number (P-5147-014) on any comments, motions, or...

  5. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented on September 4, 2013, Hydro-WM, LLC informed the Commission that the exemption from licensing for the...

  6. 75 FR 61463 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 15, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ...+ Hydro Friends Fund XLIX; FFP Missouri 15, LLC; Notice of Competing Preliminary Permit Applications..., 2010. On July 12, 2010, Lock+ Hydro Friends Fund XLVIII (Hydro Friends) and FFP Missouri 15, LLC (FFP... without the owners' express permission. Hydro Friends' proposed Lock and Dam 14 Hydropower Project...

  7. 76 FR 26284 - FirstLight Hydro Generating Company, City of Norwich Dept. of Public Utilities; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-012-CT; Project No. 12968-001-CT] FirstLight Hydro Generating Company, City of Norwich Dept. of Public Utilities; Notice of...Light Hydro Generating Company and the City of Norwich Dept. of Public Utilities to discuss the...

  8. 76 FR 35873 - Blue Heron Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13226-003] Blue Heron Hydro... Major License. b. Project No.: 13226-003. c. Date filed: November 1, 2010. d. Applicant: Blue Heron..., Blue Heron Hydro LLC, 113 Bartlett Road, Plainfield, Vermont 05667. (802) 454-1874. i. FERC Contact: Dr...

  9. 77 FR 13318 - Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000, 14196-000] Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for Preliminary Permit... Friends Fund IV: Project No. 14185-000. 2. FFP Project 55, LLC: Project No. 14196-000. Dated: February 29...

  10. 77 FR 51022 - Clark Canyon Hydro, LLC; Notice of Application Accepted for Filing, Ready for Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-007] Clark Canyon... b. Project No.: 12429-007. c. Date Filed: May 31, 2012. d. Applicant: Clark Canyon Hydro, LLC . e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: When constructed, the project...

  11. Producing more power from existing hydro resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Connor, J.

    1993-02-01

    Rehabilitation is big business in the North American hydropower industry. Hydropower producers are replacing or rehabilitating turbines, uprating old hydro generators, and installing advanced control systems. Estimates indicate that as much as 15,000 MW of new electricall generating capacity can be obtained by rehabilitating existing hydro facilities. The cost of developing this capacity is far less than for building new power projects. In most rehabilitation projects, the existing dam, powerhouse, and access roads are retained; only new mechanical and electrica equipment is required. As a result, these projects often can be accomplished for about half the cost of developing amore » new thermal plant to provide an equivalent amount of capacity. This new power does not contribute to atmospheric pollution, cause increases in operations and maintenance costs, or create uncertainties about fuel sources. The Bureau of Reclamation, the Salt River Project, the New York Power Authority, and the Tennessee Valley Authority all are either in the midst of major hydro rehabilitation projects or gearing up for future work. This activity indicates a healthy market of hydro products and services for years to come.« less

  12. 77 FR 55205 - Barren River Lake Hydro LLC; Notice of Application Accepted for Filing and Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    .... c. Date filed: December 9, 2011, and amended on June 12, 2012. d. Applicant: Barren River Lake Hydro LLC (Barren River Hydro) e. Name of Project: Barren River Lake Dam Hydroelectric Project. f. Location... registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your...

  13. 76 FR 67174 - Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3 Hydroelectric LLC, Lock...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Hydroelectric LLC, Lock Hydro Friends Fund XLV, FFP Project 2 LLC; Notice of Competing Preliminary Permit... (Riverbank) and Solia 3 Hydroelectric LLC (Solia) and on May 3, 2011, Lock Hydro Friends Fund XLV (Lock Hydro...

  14. The marginalization of "small is beautiful": Micro-hydroelectricity, common property, and the politics of rural electricity provision in Thailand

    NASA Astrophysics Data System (ADS)

    Greacen, Christopher Edmund

    This study analyzes forces that constrain sustainable deployment of cost-effective renewable energy in a developing country. By many economic and social measures, community micro-hydro is a superior electrification option for remote mountainous communities in Thailand. Yet despite a 20 year government program, only 59 projects were built and of these less than half remain operating. By comparison, the national grid has extended to over 69,000 villages. Based on microeconomic, engineering, social barriers, common pool resource, and political economic theories, this study investigates first, why so few micro-hydro projects were built, and second, why so few remain operating. Drawing on historical information, site visits, interviews, surveys, and data logging, this study shows that the marginal status of micro-hydro arises from multiple linked factors spanning from village experiences to geopolitical concerns. The dominance of the parastatal rural electrification utility, the PEA, and its singular focus on grid extension are crucial in explaining why so few projects were built. Buffered from financial consequences by domestic and international subsidies, grid expansion proceeded without consideration of alternatives. High costs borne by villagers for micro-hydro discouraged village choice. PEA remains catalytic in explaining why few systems remain operating: grid expansion plans favor villages with existing loads and most villages abandon micro-hydro generators when the grid arrives. Village experiences are fundamental: most projects suffer blackouts, brownouts, and equipment failures due to poor equipment and collective over-consumption. Over-consumption is linked to mismatch between tariffs and generator technical characteristics. Opportunities to resolve problems languished as limited state support focused on building projects and immediate repairs rather than fundamentals. Despite frustrations, many remain proud of "their power plant". Interconnecting and selling electricity to PEA offers a mutually beneficial opportunity for the Thai public and for villagers, but one thus far thwarted by bureaucratic challenges. Explanations of renewable energy dissemination in countries with strong state involvement in rural electrification should borrow approaches from political economy concerning the ways in which politics and constellations of other factors eclipse rational economic behavior. At the village level, common pool resource theory reveals causal linkages between appliance use, equipment limitations, power quality, and equipment failures.

  15. 76 FR 63920 - Amnor Hydro West, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14065-000] Amnor Hydro West... Act (FPA), proposing to study the feasibility of the Clear Creek Dam Hydropower Project (project) to...' express permission. The proposed project would utilize the existing outlet works of the U.S. Bureau of...

  16. 78 FR 938 - Burton Creek Hydro Inc., Sollos Energy, LLC'

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... Hydro Inc., Sollos Energy, LLC' Notice of Transfer of Exemption 1. By letter filed December 19, 2012, Burton Creek Hydro Inc. informed the Commission that its exemption from licensing for the Burton Creek Hydro Project, FERC No. 7577, originally issued September 25, 1985,\\1\\ has been transferred to Sollos...

  17. 76 FR 54766 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14063-000] Amnor Hydro West... feasibility of constructing the Hiram M. Chittenden Lock and Dam Hydroelectric Project (Hiram Dam Project or project) located at the Hiram M. Chittenden Lock and Dam facility owned and operated by the U.S. Army...

  18. Lac Courte Oreilles Hydro Dam Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weaver, Jason; Meyers, Amy

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  19. 77 FR 20621 - Pomperaug Hydro Project; Andrew Peklo III; Notice Extending Deadline for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project; Andrew Peklo III; Notice Extending Deadline for Comments On January 18, 2012, Office of Energy... the Commission's January 12, 2012, notice, the deadline for filing comments is extended to April 13...

  20. 77 FR 55212 - North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14379-000] North Star Hydro..., Motions To Intervene, and Competing Applications On March 30, 2012, North Star Hydro Services CA, LLC... approximately 3.8 gigawatthours. Applicant Contact: David Holland, North Star Hydro Services CA, LLC, 1110 West...

  1. 77 FR 55212 - North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14399-000] North Star Hydro..., Motions to Intervene, and Competing Applications On March 30, 2012, North Star Hydro Services CA, LLC... output would be approximately 4.6 gigawatthours. Applicant Contact: David Holland, North Star Hydro...

  2. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... issued September 21, 1988,\\2\\ has been transferred to New Hampshire Hydro Associates. The project is...

  3. 77 FR 29630 - Qualified Hydro 24, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13843-001] Qualified Hydro... No.: 13843-001. c. Date filed: January 3, 2012. d. Applicant: Qualified Hydro 24, LLC. [[Page 29631...: Ramya Swaminathan, Qualified Hydro 24, LLC, 239 Causeway Street, Suite 300, Boston, MA 02114; (978) 283...

  4. 77 FR 2968 - Pomperaug Hydro Project, Andrew Peklo III; Notice Establishing Deadline for Comments and Reply...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project, Andrew Peklo III; Notice Establishing Deadline for Comments and Reply Comments On December 15, 2011, the Commission issued notice that Office of Energy Projects staff will hold a site visit and technical meeting on January 18, 2012. The...

  5. 75 FR 80487 - Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13809-000; Project No. 13814-000] Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC; Notice Announcing Preliminary Permit..., Illinois.\\1\\ The applications [[Page 80488

  6. A large set of potential past, present and future hydro-meteorological time series for the UK

    NASA Astrophysics Data System (ADS)

    Guillod, Benoit P.; Jones, Richard G.; Dadson, Simon J.; Coxon, Gemma; Bussi, Gianbattista; Freer, James; Kay, Alison L.; Massey, Neil R.; Sparrow, Sarah N.; Wallom, David C. H.; Allen, Myles R.; Hall, Jim W.

    2018-01-01

    Hydro-meteorological extremes such as drought and heavy precipitation can have large impacts on society and the economy. With potentially increasing risks associated with such events due to climate change, properly assessing the associated impacts and uncertainties is critical for adequate adaptation. However, the application of risk-based approaches often requires large sets of extreme events, which are not commonly available. Here, we present such a large set of hydro-meteorological time series for recent past and future conditions for the United Kingdom based on weather@home 2, a modelling framework consisting of a global climate model (GCM) driven by observed or projected sea surface temperature (SST) and sea ice which is downscaled to 25 km over the European domain by a regional climate model (RCM). Sets of 100 time series are generated for each of (i) a historical baseline (1900-2006), (ii) five near-future scenarios (2020-2049) and (iii) five far-future scenarios (2070-2099). The five scenarios in each future time slice all follow the Representative Concentration Pathway 8.5 (RCP8.5) and sample the range of sea surface temperature and sea ice changes from CMIP5 (Coupled Model Intercomparison Project Phase 5) models. Validation of the historical baseline highlights good performance for temperature and potential evaporation, but substantial seasonal biases in mean precipitation, which are corrected using a linear approach. For extremes in low precipitation over a long accumulation period ( > 3 months) and shorter-duration high precipitation (1-30 days), the time series generally represents past statistics well. Future projections show small precipitation increases in winter but large decreases in summer on average, leading to an overall drying, consistently with the most recent UK Climate Projections (UKCP09) but larger in magnitude than the latter. Both drought and high-precipitation events are projected to increase in frequency and intensity in most regions, highlighting the need for appropriate adaptation measures. Overall, the presented dataset is a useful tool for assessing the risk associated with drought and more generally with hydro-meteorological extremes in the UK.

  7. 78 FR 17389 - Clark Canyon Hydro, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12429-009] Clark Canyon...: 12429-009. c. Date Filed: January 28, 2013. d. Applicant: Northwest Power Services on behalf of Clark Canyon Hydro, LLC. e. Name of Project: Clark Canyon Dam Hydroelectric Project. f. Location: The Clark...

  8. 77 FR 10503 - Fall River Community Hydro Project; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14216-000] Fall River Community Hydro Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On June 27, 2011, Fall River Valley Community Service District, California, filed an...

  9. 75 FR 11527 - KC Hydro LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13617-000] KC Hydro LLC..., 2010. On November 6, 2009, KC Hydro LLC filed an application for a preliminary permit, pursuant to... Sackheim, KC Hydro LLC, 5096 Cocoa Palm Way, Fair Oaks, CA 95628, phone: (916) 962-2271, e-mail: oregon...

  10. 76 FR 41236 - FPL Energy Maine Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-13

    ... Hydro, LLC; Notice of Application Accepted for Filing and Soliciting Comments Take notice that the....: 2283-064. c. Date Filed: March 25, 2011. d. Applicant: FPL Energy Maine Hydro, LLC. e. Name of Project... Land/Trail Management Plan issued March 25, 2010, FPL Energy Maine Hydro, LLC (licensee) filed an...

  11. Locked on course: Hydro-Quebec`s commitment to mega-projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro

    1997-01-01

    Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier successmore » with large projects, (2) its engineering culture`s norms for consistency, and (3) its role in the government`s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects.« less

  12. 75 FR 6018 - Boyce Hydro Power, LLC; Notice of Application for Amendment of License and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    .... d. Applicant: Boyce Hydro Power, LLC (BHP). e. Name of Project: Edenville Hydroelectric Project. f... construct the footings and first lift of the retaining walls. BHP states that shutting off the bypass flow...

  13. 76 FR 42124 - River Bounty, Inc.; Renew Hydro, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ....; Renew Hydro, LLC; Notice of Transfer of Exemption 1. By letters filed April 19, April 20, and May 4... Hydroelectric Project No. 5730, originally issued June 9, 1982,\\1\\ has been transferred to Renew Hydro, LLC. The... exemption does not require Commission approval. \\1\\ American Hydro Power Co., 19 FERC ] 62,426 (1982). 2...

  14. 77 FR 9222 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... Friends Fund XLII, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: December 23, 2011. d. Submitted By: Lock+ Hydro Friends Fund XLII, LLC. e. Name of Project... regulations. h. Potential Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLII, c/o Hydro...

  15. 77 FR 16216 - Lock+ Hydro Friends Fund XLVI, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Friends Fund XLVI, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 7, 2012. d. Submitted By: Lock+ Hydro Friends Fund XLVI, LLC. e. Name of Project... regulations. h. Potential Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLVI, c/o Hydro...

  16. 76 FR 66713 - Hydro Green Energy, LLC; Notice of Intent To File License Applications and Approving Use of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ...-001, 13424-001, 13809-001, 13649-001, 13651-001] Hydro Green Energy, LLC; Notice of Intent To File... Intent To File License Applications and Approving Requests to Use the Traditional Licensing Process. b... Filed: August 23, 2011. d. Submitted By: Hydro Green Energy, LLC (Hydro Green). e. Name of Projects...

  17. The development of biodiversity conservation measures in China's hydro projects: A review.

    PubMed

    Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan

    2017-11-01

    The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy of mitigation measures. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. 78 FR 77118 - KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ..., Motions To Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an... 28, 2013, application and sent an acceptance letter to KC Scoby Hydro, LLC. Subsequently, On October 28, 2013, KC Scoby Hydro, LLC, amended its preliminary permit application to change its name to KC...

  19. 78 FR 58301 - Go With the Flow Hydro Power, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14538-000] Go With the Flow..., Motions To Intervene, and Competing Applications On July 22, 2013, Go with the Flow Hydro Power, LLC...), proposing to study the feasibility of the Go with the Flow Hydroelectric Project (project) to be located on...

  20. 76 FR 35209 - FFP Qualified Hydro 14 LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ...: April 4, 2011. d. Submitted by: Free Flow Power Qualified Hydro 14 LLC (Qualified Power 14 LLC), a subsidiary of Free Flow Power Corporation. e. Name of Project: Saylorville Dam Water Power Project. f... County, Iowa. The project would occupy 1.5 acres of United States lands administered by Corps' Rock...

  1. 77 FR 64971 - Lock+ Hydro Friends Fund XLII, LLC; Notice of Waiver, in Part, of Prefiling Consultation Required...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-24

    ... Friends Fund XLII, LLC; Notice of Waiver, in Part, of Prefiling Consultation Required Under Section 4.38(C... License. b. Project No.: 13739-002. c. Date Filed: September 17, 2012. d. Applicant: Lock+ Hydro Friends.... 791(a)-825(r). h. Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XLII, c/o Hydro...

  2. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 20, 2012. d. Submitted By: Lock+ Hydro Friends Fund XXX, LLC. e. Name of Project... Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XXX, c/o Hydro Green Energy, LLC, 900...

  3. Working together to ensure safety at hydro projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartel, J.W.

    Providing for public safety around a hydroelectric facility can be critically important to the welfare of a hydro-power producer. With this in mind, Wisconsin Electric Power Company and Wisconsin Public Service Corporation have worked together to develop consistent safety signage and several for their hydro projects. Although the two utilities sometimes compete for electric customers, they cooperate to ensure the safety to those customers. Both WE and WPS took steps in 1986 to make their operations safer through involvement in the Wisconsin/Michigan Hydro User Group. The organization has 25 members-primarily of electric utilities and paper companies-who operate hydro facilities inmore » the two states. The two areas that the HUG studied in public safety were signs and warning systems. HUG established a sign committee to study how to increase safety of people around hydro plants through signs, explained Ted Handrick, hydro plant superintendent at WPS. The committee's recommendations led to development of a statewide uniform sign system adopted by all HUG members. The committee used Wisconsin Department of Natural Resources' guidelines for warning signs and portages in developing the signage standards. HUG members are converting to these new sign standards as they replace old signs and/or install new signs. Notices describing the new signage system have been placed near each hydro plant, at boat landings, and in campgrounds. The signs are mounted well above ground level so they can be seen and easily read by recreationalists. Warning systems, in accordance with HUG warning standards, were installed at WE and WPS hydro facilities. These systems alert nearby recreational users of rapid increases in water flow when generating units are turned on or when spillway gates are opened. Soon after the authors installed equipment to remotely operate its hydro facilities, the utility experienced a dramatic increase increase in intrusion on dams and other structures at the projects.« less

  4. Demonstration of variable speed permanent magnet generator at small, low-head hydro site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown Kinloch, David

    Small hydro developers face a limited set of bad choices when choosing a generator for a small low-head hydro site. Direct drive synchronous generators are expensive and technically complex to install. Simpler induction generators are higher speed, requiring a speed increaser, which results in inefficiencies and maintenance problems. In addition, both induction and synchronous generators turn at a fixed speed, causing the turbine to run off its peak efficiency curve whenever the available head is different than the designed optimum head.The solution to these problems is the variable speed Permanent Magnet Generators (PMG). At the Weisenberger Mill in Midway, KY,more » a variable speed Permanent Magnet Generator has been installed and demonstrated. This new PMG system replaced an existing induction generator that had a HTD belt drive speed increaser system. Data was taken from the old generator before it was removed and compared to data collected after the PMG system was installed. The new variable speed PMG system is calculated to produce over 96% more energy than the old induction generator system during an average year. This significant increase was primarily due to the PMG generator operating at the correct speed at the maximum head, and the ability for the PMG generator to reduce its speed to lower optimum speeds as the stream flow increased and the net head decreased.This demonstration showed the importance of being able to adjust the speed of fixed blade turbines. All fixed blade turbines with varying net heads could achieve higher efficiencies if the speed can be matched to the optimum speed as the head changes. In addition, this demonstration showed that there are many potential efficiencies that could be realized with variable speed technology at hydro sites where mismatched turbine and generator speeds result in lower power output, even at maximum head. Funding for this project came from the US Dept. of Energy, through Award Number DE-EE0005429.« less

  5. 77 FR 10739 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... Drawing Project No. FFP Project 91, LLC 14275-000 Riverbank Hydro No. 23, LLC 14279-000 Lock+ Hydro... conduct a random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  6. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13831-000] Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing and Soliciting Comments and Interventions October 15, 2010. On August 9, 2010, Vortex Hydro Energy, LLC filed an...

  7. 76 FR 19355 - Oregon Winds Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14109-000] Oregon Winds..., Motions To Intervene, and Competing Applications On March 11, 2011, Oregon Winds Hydro, LLC filed an... study the feasibility of the Oregon Winds Pumped Storage Project to be located on the John Day River...

  8. 78 FR 37210 - Parker Knoll Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Environmental Site Review Take notice that the following hydroelectric applications have been filed with Commission and are available for public inspection: a. Type of Application: New Major License. b. Project No.: 13239. c. Date...

  9. 77 FR 59607 - Black Canyon Hydro, LLC; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14110-001] Black Canyon Hydro, LLC; Notice of Environmental Site Review On Wednesday, October 3, 2012, at 3 p.m., Commission staff will be participating in an environmental site review for the proposed Black Canyon Hydroelectric Project. All interested participants should mee...

  10. 76 FR 4894 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Drawing January 20, 2011. Lock Hydro Friends Fund XLI Project No. 13736-000 Allegheny 7 Hydro, LLC Project... Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room...

  11. A Student Activity for the James Bay Hydro Project. The Geography Teacher.

    ERIC Educational Resources Information Center

    Green-Milberg, Patricia

    1999-01-01

    Provides activities for grades 6 to 8 that will promote student awareness and understanding of the use of hydropower in Canada, the benefits and drawbacks to hydropower, and also the drawbacks of electricity transmission lines. Explains that the activities focus on the James Bay Hydro Project in Canada. (CMK)

  12. 76 FR 2370 - Mount Storm Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13863-000] Mount Storm..., Motions To Intervene, and Competing Applications January 6, 2011. On October 14, 2010, Mount Storm Hydro... (FPA), proposing to study the feasibility of the Mount Storm Pumped Storage Project to be located near...

  13. 78 FR 45918 - Application for Presidential Permit; Soule River Hydroelectric Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Hydro. Soule Hydro proposes to construct and operate a high-voltage alternating current (HVAC... 8-mile long, 138 kilovolt (kV) HVAC 3-phase submarine cable that would be laid on the floor of... whether the proposed project would adversely affect the operation of the U.S. electric power supply system...

  14. 76 FR 27310 - Janet A. Boyd, Boyd Hydro, LLC; Notice of Application for Transfer of License, and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7269-028] Janet A. Boyd... Intervene On March 25, 2011, Janet A. Boyd (transferor) and Boyd Hydro, LLC (transferee) filed an... Jim Boyd Hydroelectric Project from transferor to transferee. Applicants' Contact: Transferor: Janet A...

  15. 75 FR 11153 - Hydro Energy Technologies, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ...-long gravity dam; (2) a existing 36-acre impoundment with a storage capacity of 250 acre feet.; (3) an... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13627-000] Hydro Energy..., Motions To Intervene, and Competing Applications March 1, 2010. On November 6, 2009, Hydro Energy...

  16. 75 FR 12229 - Sweetwater Hydro, LLC and Ute Mountain Ute Tribe; Notice of Preliminary Permit Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13615-000] Sweetwater Hydro, LLC and Ute Mountain Ute Tribe; Notice of Preliminary Permit Application Accepted for Filing and..., Sweetwater Hydro, LLC and Ute Mountain Ute Tribe filed an application for a preliminary permit, pursuant to...

  17. 77 FR 35371 - Qualified Hydro 24, LLC; Notice of Cancellation of Scoping Meetings and Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13843-001] Qualified Hydro 24, LLC; Notice of Cancellation of Scoping Meetings and Environmental Site Review Take notice that Qualified Hydro 24, LLC, filed a request on June 4, 2012, to surrender the preliminary permit for the...

  18. 76 FR 34071 - Lock Hydro Friends Fund I; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14107-000] Lock Hydro Friends Fund I; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 4, 2011, Lock Hydro Friends Fund I, filed an...

  19. 76 FR 18755 - Lock Hydro Friends Fund LII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13810-000] Lock Hydro Friends Fund LII; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 12, 2010, Lock Hydro Friends Fund LII, filed an...

  20. 75 FR 27769 - Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13711-000] Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 11, 2010. On April 13, 2010 Lock+ Hydro Friends Fund...

  1. 76 FR 18755 - Lock Hydro Friends Fund LI; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13818-000] Lock Hydro Friends Fund LI; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On July 16, 2010, Lock Hydro Friends Fund LI, filed an...

  2. 75 FR 27770 - Lock+ Hydro Friends Fund VIII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13710-000] Lock+ Hydro Friends Fund VIII; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications May 11, 2010. On April 13, 2010 Lock+ Hydro Friends Fund...

  3. 77 FR 14516 - Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14339-000] Lock+ Hydro Friends Fund VII; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On December 22, 2011, Lock+ Hydro Friends Fund VII filed...

  4. 76 FR 54765 - Lock+ Hydro Friends Fund IV; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14253-000] Lock+ Hydro Friends Fund IV; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On August 10, 2011, the Lock+ Hydro Friends Fund IV filed...

  5. CAD for small hydro projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bishop, N.A. Jr.

    1994-04-01

    Over the past decade, computer-aided design (CAD) has become a practical and economical design tool. Today, specifying CAD hardware and software is relatively easy once you know what the design requirements are. But finding experienced CAD professionals is often more difficult. Most CAD users have only two or three years of design experience; more experienced design personnel are frequently not CAD literate. However, effective use of CAD can be the key to lowering design costs and improving design quality--a quest familiar to every manager and designer. By emphasizing computer-aided design literacy at all levels of the firm, a Canadian joint-venturemore » company that specializes in engineering small hydroelectric projects has cut costs, become more productive and improved design quality. This article describes how they did it.« less

  6. Relevance of Regional Hydro-Climatic Projection Data for Hydrodynamics and Water Quality Modelling of the Baltic Sea

    NASA Astrophysics Data System (ADS)

    Goldenberg, R.; Vigouroux, G.; Chen, Y.; Bring, A.; Kalantari, Z.; Prieto, C.; Destouni, G.

    2017-12-01

    The Baltic Sea, located in Northern Europe, is one of the world's largest body of brackish water, enclosed and surrounded by nine different countries. The magnitude of climate change may be particularly large in northern regions, and identifying its impacts on vulnerable inland waters and their runoff and nutrient loading to the Baltic Sea is an important and complex task. Exploration of such hydro-climatic impacts is needed to understand potential future changes in physical, ecological and water quality conditions in the regional coastal and marine waters. In this study, we investigate hydro-climatic changes and impacts on the Baltic Sea by synthesizing multi-model climate projection data from the CORDEX regional downscaling initiative (EURO- and Arctic- CORDEX domains, http://www.cordex.org/). We identify key hydro-climatic variable outputs of these models and assess model performance with regard to their projected temporal and spatial change behavior and impacts on different scales and coastal-marine parts, up to the whole Baltic Sea. Model spreading, robustness and impact implications for the Baltic Sea system are investigated for and through further use in simulations of coastal-marine hydrodynamics and water quality based on these key output variables and their change projections. Climate model robustness in this context is assessed by inter-model spreading analysis and observation data comparisons, while projected change implications are assessed by forcing of linked hydrodynamic and water quality modeling of the Baltic Sea based on relevant hydro-climatic outputs for inland water runoff and waterborne nutrient loading to the Baltic sea, as well as for conditions in the sea itself. This focused synthesis and analysis of hydro-climatically relevant output data of regional climate models facilitates assessment of reliability and uncertainty in projections of driver-impact changes of key importance for Baltic Sea physical, water quality and ecological conditions and their future evolution.

  7. 76 FR 35875 - Blue Heron Hydro LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13368-002] Blue Heron Hydro... Minor License. b. Project No.: 13368-002. c. Date filed: November 1, 2010. d. Applicant: Blue Heron.... Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r). h. Applicant Contact: Lori Barg, Blue...

  8. 77 FR 59608 - Go Green Go Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14427-000] Go Green Go... To Intervene, and Competing Applications On June 20, 2012, Go Green Go Hydro LLC (Go Green or... of 5,000 megawatt-hours. Applicant Contact: Mr. David G. DeMera, Go Green Go Hydro LLC, 18300 Morgan...

  9. 76 FR 71960 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14247-000] KC Hydro LLC of..., Motions To Intervene, and Competing Applications On August 8, 2011, KC Hydro LLC of New Hampshire filed an... spillway elevation of 130 feet mean sea level (msl); (3) connecting new electrical [[Page 71961...

  10. 11. AERIAL VIEW OF CROSSCUT FACILITY, LOOKING NORTH. THE HYDRO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. AERIAL VIEW OF CROSSCUT FACILITY, LOOKING NORTH. THE HYDRO PLANT CENTER SITS ON THE EDGE OF RAVINE WHICH IS ACTUALLY THE BEGINNING OF THE GRAND CANAL. THE CROSS-CUT STEAM PLANT IS THE LARGE WHITE BUILDING JUST WEST OF THE HYDRO PLANT, WITH THE TRANSMISSION SWITCHYARD IN BETWEEN. THE OTHER BUILDINGS ARE SALT RIVER PROJECT FABRICATION AND EQUIPMENT SHOPS Photographer unknown, August 22, 1958 - Cross Cut Hydro Plant, North Side of Salt River, Tempe, Maricopa County, AZ

  11. Restoring coastal wetlands that were ditched for mosquito control: a preliminary assessment of hydro-leveling as a restoration technique

    USGS Publications Warehouse

    Smith, Thomas J.; Tiling, Ginger; Leasure, Pamela S.

    2007-01-01

    The wetlands surrounding Tampa Bay, Florida were extensively ditched for mosquito control in the 1950s. Spoil from ditch construction was placed adjacent to the wetlands ditches creating mound-like features (spoil-mounds). These mounds represent a loss of 14% of the wetland area in Tampa Bay. Spoil mounds interfere with tidal flow and are locations for non-native plants to colonize (e.g., Schinus terebinthifolius). Removal of the spoil mounds to eliminate exotic plants, restore native vegetation, and re-establish natural hydrology is a restoration priority for environmental managers. Hydro-leveling, a new technique, was tested in a mangrove forest restoration project in 2004. Hydro-leveling uses a high pressure stream of water to wash sediment from the spoil mound into the adjacent wetland and ditch. To assess the effectiveness of this technique, we conducted vegetation surveys in areas that were hydro-leveled and in non-hydro-leveled areas 3 years post-project. Adult Schinus were reduced but not eliminated from hydro-leveled mounds. Schinus seedlings however were absent from hydro-leveled sites. Colonization by native species was sparse. Mangrove seedlings were essentially absent (≈2 m−2) from the centers of hydro-leveled mounds and were in low density on their edges (17 m−2) in comparison to surrounding mangrove forests (105 m−2). Hydro-leveling resulted in mortality of mangroves adjacent to the mounds being leveled. This was probably caused by burial of pneumatophores during the hydro-leveling process. For hydro-leveling to be a useful and successful restoration technique several requirements must be met. Spoil mounds must be lowered to the level of the surrounding wetlands. Spoil must be distributed further into the adjacent wetland to prevent burial of nearby native vegetation. Finally, native species may need to be planted on hydro-leveled areas to speed up the re-vegetation process.

  12. 77 FR 40354 - Mesa de Los Carros Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13316-001] Mesa de Los..., Motions To Intervene, and Competing Applications On April 3, 2012, Mesa De Los Carros Hydro, LLC filed an... the Mesa De Los Carros Pumped Storage Project to be located in San Miguel County, New Mexico. The...

  13. 77 FR 60419 - Lock + Hydro Friends Fund XIX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... Friends Fund XIX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: August 7, 2012. d. Submitted By: Lock + Hydro Friends Fund XIX, LLC. e. Name of Project.... Lock + Hydro Friends Fund XIX, LLC filed its request to use the Traditional Licensing Process on August...

  14. 77 FR 16217 - Lock+ Hydro Friends Fund XXXIX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Friends Fund XXXIX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 7, 2012. d. Submitted by: Lock+ Hydro Friends Fund XXXIX, LLC. e. Name of Project... Commission's regulations. h. Potential Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund...

  15. 75 FR 16091 - Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11143-020] Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene March 24, 2010. On March 8, 2010, Glen Falls Hydro, LLC (transferor) and Essex Energy Partners, LLC (transferee) filed...

  16. 77 FR 20622 - N.E.W. Hydro LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2744-041; 2744-042] N.E.W....: 2744-041 & 042. c. Date Filed: March 14, 2012. d. Applicant: N.E.W. Hydro LLC. e. Name of Project..., 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Scott Klabunde, P.O. Box 167, 116 N. State Street...

  17. Hydro-economic modelling in mining catchments

    NASA Astrophysics Data System (ADS)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using water for an economic activity with high revenues, averse to water risks and with potentially large catchment impacts.

  18. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    NASA Astrophysics Data System (ADS)

    Jidin, Razali; Othman, Bahari

    2013-06-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  19. Tech notes: Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software are covered. This month`s Tech Notes include: (1) a study linking development and reservoir silting in El Salvador, (2) publication of a guide for small hydro operatos, and (3) publication of a text outlining the development of hydroelectric power in Russia.

  20. Final Report - Wind and Hydro Energy Feasibility Study - June 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jim Zoellick; Richard Engel; Rubin Garcia

    2011-06-17

    This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.

  1. 75 FR 41858 - Notice of Termination of License by Implied Surrender and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ...,000-kVA transformer, and a 70-foot-long, 15-kV transmission line; (6) a tailrace; and (7) other... Hydro Electric Company (Roosevelt Hydro). 16 FERC ] 62,040 (1981). The project has not operated since...

  2. Tech notes: Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software. Items covered this month include: (1) a recommendation that dam designers give more consideration to earthquake resistance, (2) the development of a new wave rotor design, (3) the development of a small hydro database in China, and (4) an ICOLD bulletin on the optimization of constuction costs.

  3. Influence of seasonal and inter-annual hydro-meteorological variability on surface water fecal coliform concentration under varying land-use composition.

    PubMed

    St Laurent, Jacques; Mazumder, Asit

    2014-01-01

    Quantifying the influence of hydro-meteorological variability on surface source water fecal contamination is critical to the maintenance of safe drinking water. Historically, this has not been possible due to the scarcity of data on fecal indicator bacteria (FIB). We examined the relationship between hydro-meteorological variability and the most commonly measured FIB, fecal coliform (FC), concentration for 43 surface water sites within the hydro-climatologically complex region of British Columbia. The strength of relationship was highly variable among sites, but tended to be stronger in catchments with nival (snowmelt-dominated) hydro-meteorological regimes and greater land-use impacts. We observed positive relationships between inter-annual FC concentration and hydro-meteorological variability for around 50% of the 19 sites examined. These sites are likely to experience increased fecal contamination due to the projected intensification of the hydrological cycle. Seasonal FC concentration variability appeared to be driven by snowmelt and rainfall-induced runoff for around 30% of the 43 sites examined. Earlier snowmelt in nival catchments may advance the timing of peak contamination, and the projected decrease in annual snow-to-precipitation ratio is likely to increase fecal contamination levels during summer, fall, and winter among these sites. Safeguarding drinking water quality in the face of such impacts will require increased monitoring of FIB and waterborne pathogens, especially during periods of high hydro-meteorological variability. This data can then be used to develop predictive models, inform source water protection measures, and improve drinking water treatment. Copyright © 2013 Elsevier Ltd. All rights reserved.

  4. 75 FR 45625 - Slatersville Hydro, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13356-000-RI] Slatersville Hydro, LLC; Notice of Availability of Environmental Assessment July 27, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18...

  5. 76 FR 9345 - Soule Hydro, LLC; Notice of Draft License Application and Preliminary Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ...] Soule Hydro, LLC; Notice of Draft License Application and Preliminary Draft Environmental Assessment (PDEA) and Request for Preliminary Terms and Conditions Take notice that the following hydroelectric... Project: With this notice the Commission is soliciting (1) preliminary terms, conditions, and...

  6. 75 FR 49929 - Music Mountain Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13760-000] Music Mountain..., Motions To Intervene, and Competing Applications August 9, 2010. On May 18, 2010, Music Mountain Hydro..., proposing to study the feasibility of the Music [[Page 49930

  7. Decision support for the management of water resources at Sub-middle of the São Francisco river basin in Brazil using integrated hydro-economic modeling and scenarios for land use changes

    NASA Astrophysics Data System (ADS)

    Moraes, M. G. A.; Souza da Silva, G.

    2016-12-01

    Hydro-economic models can measure the economic effects of different operating rules, environmental restrictions, ecosystems services, technical constraints and institutional constraints. Furthermore, water allocation can be improved by considering economical criteria's. Likewise, climate and land use change can be analyzed to provide resilience. We developed and applied a hydro-economic optimization model to determine the optimal water allocation of main users in the Lower-middle São Francisco River Basin in Northeast (NE) Brazil. The model uses demand curves for the irrigation projects, small farmers and human supply, rather than fixed requirements for water resources. This study analyzed various constraints and operating alternatives for the installed hydropower dams in economic terms. A seven-year period (2000-2006) with water scarcity in the past has been selected to analyze the water availability and the associated optimal economic water allocation. The used constraints are technical, socioeconomic and environmental. The economically impacts of scenarios like prioritizing human consumption, impacts of the implementation of the São Francisco river transposition, human supply without high distribution losses, environmental hydrographs, forced reservoir level control, forced reduced reservoir capacity, alteration of lower flow restriction were analyzed. The results in this period show that scarcity costs related ecosystem service and environmental constraints are significant, and have major impacts (increase of scarcity cost) for consumptive users like irrigation projects. In addition, institutional constraints such as prioritizing human supply, minimum release limits downstream of the reservoirs and the implementation of the transposition project impact the costs and benefits of the two main economic sectors (irrigation and power generation) in the region of the Lower-middle of the São Francisco river basin. Scarcity costs for irrigation users generally increase more (in percentage terms) than the other users associated to environmental and institutional constraints.

  8. 76 FR 80924 - Blue Heron Hydro LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13226-003; 13368-002] Blue Heron Hydro LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission (Commission) regulations, 18 CFR...

  9. 78 FR 66785 - Korea Hydro and Nuclear Power Co., Ltd., and Korea Electric Power Corporation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... NUCLEAR REGULATORY COMMISSION [Project No. 0782; NRC-2013-0244] Korea Hydro and Nuclear Power Co., Ltd., and Korea Electric Power Corporation AGENCY: Nuclear Regulatory Commission. ACTION: Notice of receipt; availability. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff acknowledges receipt of...

  10. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  11. Ontario Hydro and SGML.

    ERIC Educational Resources Information Center

    Rockley, Ann

    1993-01-01

    Describes how an analysis of Ontario Hydro's conversion of 20,000 pages of paper manuals to online documentation established the scope of the project, provided a set of design criteria, and recommended the use of Standard Generalized Markup Language to create the new documentation and the purchase of the "Dinatext" program to produce it.…

  12. 76 FR 8724 - First Light Hydro Generating Company; Notice of Application Accepted for Filing, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2485-059] First Light Hydro..., Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Commenters can submit... photovoltaic solar array will provide power to Northfield Mountain Visitor's Center. The solar array would be...

  13. Modeling Responses of Naturally Fractured Geothermal Reservoir to Low-Pressure Stimulation

    DOE Data Explorer

    Fu, Pengcheng; Carrigan, Charles R.

    2012-01-01

    Hydraulic shearing is an appealing reservoir stimulation strategy for Enhanced Geothermal Systems. It is believed that hydro-shearing is likely to simulate a fracture network that covers a relatively large volume of the reservoir whereas hydro-fracturing tends to create a small number of fractures. In this paper, we examine the geomechanical and hydraulic behaviors of natural fracture systems subjected to hydro-shearing stimulation and develop a coupled numerical model within the framework of discrete fracture network modeling. We found that in the low pressure hydro-shearing regime, the coupling between the fluid phase and the rock solid phase is relatively simple, and the numerical model is computationally efficient. Using this modified model, we study the behavior of a random fracture network subjected to hydro-shearing stimulation.

  14. Brazil upgrades microwave system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newman, H.S.; Gomes, H.P.

    1979-02-01

    To provide communications facilities necessary during major construction projects, and for the operation and control of the expanding electric-power network, in 1967 Furnas-Centrais Eletricas SA, Brazil, started installing the first 22 links of its microwave system, from the Botafogo plant in Rio de Janeiro to the Furnas hydro station, and from the Furnas hydro station, southwest, to the Guarulhos plant in Sao Paulo and northwest to the Estreito hydro plant. To accommodate the construction of additional hydroelectric facilities, the second and third microwave-system expansions added nine links from Estreito hydro, northwest, to Marimbondo hydro and 7 links to Itumbiara. Themore » fourth expansion included two links to connect with the Angra dos Reis nuclear generating plant. A modern SCADA system replaced an earlier fault-reporting method, and a means of monitoring performance communications was established.« less

  15. 78 FR 43187 - PacifiCorp, St. Anthony Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    .... Anthony Hydro LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene...-6779, [email protected] . j. Deadline for filing comments, motions to intervene, and protests, is... of your comments. Please include the project number (P-2381-063) on any comments, motions, or...

  16. Hydro-climatic simulation of Spring Creek Basin under dynamic C02 atmospheric concentration

    USDA-ARS?s Scientific Manuscript database

    Climate factors monitoring have indicated that global atmospheric C02 concentration rose in the past, and further rise should be expected in the future as indicated by projections. SWAT is a hydro-climatic distributed model used to assess the efficiency of agricultural and land use best management p...

  17. 78 FR 34090 - New Hampshire Water Resources Board, Hydro Dynamics Corporation; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 5379-008] New Hampshire Water Resources Board, Hydro Dynamics Corporation; Notice of Transfer of Exemption 1. By letter filed April 16, 2013, New Hampshire Water Resources Board co-exemptee and the New Hampshire Department of...

  18. 76 FR 18212 - FPL Energy Maine Hydro LLC; Madison Paper Industries; Merimil Limited Partnership; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2615-037] FPL Energy Maine Hydro LLC; Madison Paper Industries; Merimil Limited Partnership; Notice of Availability of Draft... paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal...

  19. 75 FR 4552 - Clean Water Act Class II: Proposed Administrative Settlement, Penalty Assessment, and Opportunity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... CONTACT: Michael Calhoun, Special Litigation and Projects Division (2248-A), U.S. Environmental Protection...-9001; e-mail: calhoun[email protected] . SUPPLEMENTARY INFORMATION: I. Background In July 2005, Hydro... supplemental audit reports in 2006 and 2007. EPA and Hydro have signed an administrative Consent Agreement...

  20. Long-term hydro-climatic changes in the Selenga river basin, Central Asia

    NASA Astrophysics Data System (ADS)

    Törnqvist, Rebecka; Asokan, Shilpa M.; Pietroń, Jan; Jarsjö, Jerker; Destouni, Georgia

    2014-05-01

    Climatic changes can lead to altered hydrological conditions, which in turn can impact pollutant loading patterns to the terminal recipient of a considered basin. Lake Baikal is the deepest and largest freshwater reservoir on Earth. The lake and its surroundings have been declared an UNESCO World Heritage Site due to its unique ecosystem with numerous endemic animal and plant species. The Selenga river basin, which is located in northern Mongolia and southern Siberia in Russia, is the largest sub-basin of the Lake Baikal. Mining is well developed in the region and has been identified to be the main pollution source for the water system in the sparsely populated region. We investigate long-term historic and projected future hydro-climatic conditions in the Selenga river basin with the aim to improve the understanding of such underlying conditions in the basin. This understanding is fundamental for preventing degradation of Lake Baikal's unique ecosystem from for instance mining activities. Specifically, our objective is to identify observed historical hydro-climatic changes during the 72-year period of 1938-2009. In addition, we assess multi-model ensemble means of the Coupled Model Intercomparison Project, Phase 5 (CMIP5) in order to also consider future projections of hydro-climatic changes for a near future period (2010-2039) and a more distant future period (2070-2099). The results show that there has been an observed increase in mean annual temperature in the basin by about 1.5°C during the period 1938-2009. Moreover, a longer seasonal period of temperatures above zero (especially due to increasing spring temperatures) is detected. For the annual water balance components of precipitation, evapotranspiration and runoff, relatively small temporal changes are observed. However, in recent years there has been a detected decrease in runoff, with 10-year running averages reaching their lowest levels within the whole investigation period. In particular, there has been a decrease in peak discharges during summer and an increase in winter base flow. Such decreased intra-annual variability may be an indication of permafrost thawing, associated with increased active layer depth and thereby decreased subsurface storage of (liquid and frozen) water. Future projections indicate a continued large increase in temperature for the long distance future (2070-2099), from a mean annual temperature of -2.5°C for the period 1961-1990 to a mean annual temperature of 3°C for the period 2070-2099. Such a shift from mean annual temperatures below zero to well above zero may lead to further permafrost thawing. The magnitude of precipitation, evapotranspiration and runoff are expected to increase in the future. However, especially the projection for runoff is highly uncertain due to large variation in projections from individual models and an overall poor performance of the models to capture the observed trend.

  1. HydroShare for iUTAH: Collaborative Publication, Interoperability, and Reuse of Hydrologic Data and Models for a Large, Interdisciplinary Water Research Project

    NASA Astrophysics Data System (ADS)

    Horsburgh, J. S.; Jones, A. S.

    2016-12-01

    Data and models used within the hydrologic science community are diverse. New research data and model repositories have succeeded in making data and models more accessible, but have been, in most cases, limited to particular types or classes of data or models and also lack the type of collaborative, and iterative functionality needed to enable shared data collection and modeling workflows. File sharing systems currently used within many scientific communities for private sharing of preliminary and intermediate data and modeling products do not support collaborative data capture, description, visualization, and annotation. More recently, hydrologic datasets and models have been cast as "social objects" that can be published, collaborated around, annotated, discovered, and accessed. Yet it can be difficult using existing software tools to achieve the kind of collaborative workflows and data/model reuse that many envision. HydroShare is a new, web-based system for sharing hydrologic data and models with specific functionality aimed at making collaboration easier and achieving new levels of interactive functionality and interoperability. Within HydroShare, we have developed new functionality for creating datasets, describing them with metadata, and sharing them with collaborators. HydroShare is enabled by a generic data model and content packaging scheme that supports describing and sharing diverse hydrologic datasets and models. Interoperability among the diverse types of data and models used by hydrologic scientists is achieved through the use of consistent storage, management, sharing, publication, and annotation within HydroShare. In this presentation, we highlight and demonstrate how the flexibility of HydroShare's data model and packaging scheme, HydroShare's access control and sharing functionality, and versioning and publication capabilities have enabled the sharing and publication of research datasets for a large, interdisciplinary water research project called iUTAH (innovative Urban Transitions and Aridregion Hydro-sustainability). We discuss the experiences of iUTAH researchers now using HydroShare to collaboratively create, curate, and publish datasets and models in a way that encourages collaboration, promotes reuse, and meets funding agency requirements.

  2. HydroDesktop: An Open Source GIS-Based Platform for Hydrologic Data Discovery, Visualization, and Analysis

    NASA Astrophysics Data System (ADS)

    Ames, D. P.; Kadlec, J.; Cao, Y.; Grover, D.; Horsburgh, J. S.; Whiteaker, T.; Goodall, J. L.; Valentine, D. W.

    2010-12-01

    A growing number of hydrologic information servers are being deployed by government agencies, university networks, and individual researchers using the Consortium of Universities for the Advancement of Hydrologic Science, Inc. (CUAHSI) Hydrologic Information System (HIS). The CUAHSI HIS Project has developed a standard software stack, called HydroServer, for publishing hydrologic observations data. It includes the Observations Data Model (ODM) database and Water Data Service web services, which together enable publication of data on the Internet in a standard format called Water Markup Language (WaterML). Metadata describing available datasets hosted on these servers is compiled within a central metadata catalog called HIS Central at the San Diego Supercomputer Center and is searchable through a set of predefined web services based queries. Together, these servers and central catalog service comprise a federated HIS of a scale and comprehensiveness never previously available. This presentation will briefly review/introduce the CUAHSI HIS system with special focus on a new HIS software tool called "HydroDesktop" and the open source software development web portal, www.HydroDesktop.org, which supports community development and maintenance of the software. HydroDesktop is a client-side, desktop software application that acts as a search and discovery tool for exploring the distributed network of HydroServers, downloading specific data series, visualizing and summarizing data series and exporting these to formats needed for analysis by external software. HydroDesktop is based on the open source DotSpatial GIS developer toolkit which provides it with map-based data interaction and visualization, and a plug-in interface that can be used by third party developers and researchers to easily extend the software using Microsoft .NET programming languages. HydroDesktop plug-ins that are presently available or currently under development within the project and by third party collaborators include functions for data search and discovery, extensive graphing, data editing and export, HydroServer exploration, integration with the OpenMI workflow and modeling system, and an interface for data analysis through the R statistical package.

  3. 76 FR 71961 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14246-000] KC Hydro LLC of... equipment with total hydraulic capacity of 246 cubic feet per second (cfs) and total installed generating...-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory...

  4. 77 FR 63311 - Lake Clementine Hydro, LLC; Notice of Successive Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Dam on the North Fork of the American River, near the City of Auburn, Placer County, California. The... Fork Dam, Lake Clementine Hydro plans to install two 7.5 megawatt (MW) generation units, for a total... to study three alternative designs for the project. Applicant Contact: Mr. Magnus Johannesson...

  5. 77 FR 73654 - Eau Galle Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ... Renewable Energy Company, Eau Galle Hydro, LLC; Notice of Transfer of Exemption 1. By letter filed October 12, 2012, Eau Galle Renewable Energy Company informed the Commission that its exemption from... transferred to Eau Galle Renewable Energy Company by letter.\\2\\ The project is located on the Eau Galle River...

  6. 75 FR 65311 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13815-000] Renew Hydro, LLC... Municipal Utilities Authority's existing 115-foot-high, 2,150-foot-long concrete gravity dam, with 500-foot...; (3) the existing Boonton reservoir with an 825-acre surface area and a 28,200 acre-foot storage area...

  7. 77 FR 68764 - Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice of Scoping Meetings and Soliciting Scoping Comments Take notice that the following hydroelectric applications have been filed with Commission and are available for...

  8. 77 FR 101 - Rumford Falls Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2333-078] Rumford Falls Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Types...

  9. 77 FR 99 - Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13022-003] Barren River Lake Hydro LLC; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedural Schedule for Licensing and a Deadline for Submission of Final Amendments Take notice that the following...

  10. 77 FR 61585 - FPL Energy Maine Hydro LLC; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... Hydro LLC; Notice of Intent To File License Application, Filing of Pre-Application Document (PAD... Application for a New License and Commencing Pre-filing Process. b. Project No.: 2531-067. c. Dated Filed... Commission a Pre-Application Document (PAD; including a proposed process plan and schedule), pursuant to 18...

  11. Brigham City Hydro Generation Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ammons, Tom B.

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicatedmore » that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.« less

  12. Hydro-meteorological risk reduction through land restoration in Rangárvellir, Iceland - an overview of the HydroResilience project

    NASA Astrophysics Data System (ADS)

    Finger, David C.; Pétursdóttir, Þórunn; Halldórsson, Guðmundur

    2017-04-01

    Ecosystems that are in equilibrium provide vital resources to local inhabitants, including protection from naturally occurring disasters. Natural vegetation cover has been optimized over many years to retain a maximum of rainfall runoff by increasing the field capacity (FC) of the soil cover, securing water availability during droughts and reducing the flood risk during heavy precipitation events. In this presentation we will present the HydroResilience project, which will assess the effects of ecosystem restoration on the runoff dynamics of rainfall water in Rangárvellir, a restoration area in southern Iceland. The Rangárvellir area presents ideal conditions for such investigations. Dramatic deforestation during the last millennium and year round livestock grazing along with devastating ash depositions during volcanic eruptions and a harsh sub-polar oceanic climate have led to severe degradation in Rangárvellir. Since the beginning of the 20th century diverse restoration measures have been implemented making Rangárvellir an ideal case study to investigate the effects of restoration on hydro-meteorological risk reduction. In this project we will assess and quantify the evolution of water resources in Rangárvellir by assessing the runoff dynamics in the main rivers of Rangárvellir under four main scenarios: i) present conditions, ii) degraded conditions as was the case 100 years ago, iii) under hypothetical fully restored ecosystems and, finally, iv) under conditions of a scenario developed in collaboration with local stakeholder groups to optimize socio-ecological benefits. For this purpose the dynamics of the relevant hydrological processes in the area (incl. river runoff, ground water table, snow cover duration, and soil moisture dynamics) will be reconstructed using hydrological models to run the above mentioned scenarios. The scientific findings and conclusion of this project will generate valuable insights on the effects of land restoration on hydro-meteorological risk reduction. The presentations will outline the main methods used during the project and conclude by providing an outlook on the expected results.

  13. Evaluation of the feasibility and viability of modular pumped storage hydro (m-PSH) in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witt, Adam M.; Hadjerioua, Boualem; Martinez, Rocio

    The viability of modular pumped storage hydro (m-PSH) is examined in detail through the conceptual design, cost scoping, and economic analysis of three case studies. Modular PSH refers to both the compactness of the project design and the proposed nature of product fabrication and performance. A modular project is assumed to consist of pre-fabricated standardized components and equipment, tested and assembled into modules before arrival on site. This technology strategy could enable m-PSH projects to deploy with less substantial civil construction and equipment component costs. The concept of m-PSH is technically feasible using currently available conventional pumping and turbine equipment,more » and may offer a path to reducing the project development cycle from inception to commissioning.« less

  14. Customizing WRF-Hydro for the Laurentian Great Lakes Basin

    NASA Astrophysics Data System (ADS)

    Gronewold, A.; Pei, L.; Gochis, D.; Mason, L.; Sampson, K. M.; Dugger, A. L.; Read, L.; McCreight, J. L.; Xiao, C.; Lofgren, B. M.; Anderson, E. J.; Chu, P. Y.

    2017-12-01

    To advance the state of the art in regional hydrological forecasting, and to align with operational deployment of the National Water Model, a team of scientists has been customizing WRF-Hydro (the Weather Research and Forecasting model - Hydrological modeling extension package) to the entirety (including binational land and lake surfaces) of the Laurentian Great Lakes basin. Objectives of this customization project include opererational simulation and forecasting of the Great Lakes water balance and, in the short-term, research-oriented insights into modeling one- and two-way coupled lake-atmosphere and near-shore processes. Initial steps in this project have focused on overcoming inconsistencies in land surface hydrographic datasets between the United States and Canada. Improvements in the model's current representation of lake physics and stream routing are also critical components of this effort. Here, we present an update on the status of this project, including a synthesis of offline tests with WRF-Hydro based on the newly developed Great Lakes hydrographic data, and an assessment of the model's ability to simulate seasonal and multi-decadal hydrological response across the Great Lakes.

  15. 76 FR 16766 - ECOsponsible, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... feasibility of the Niagara River Community Hydro Project (Niagara Project or project) to be located on the... electricity to an onshore collection substation and point of interconnection switchyard; (3) an operations and...

  16. Benefits of Traditional Hydro to MHK and the Regulatory Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levine, Aaron

    Presentation discussing how traditional hydropower laws and regulations can be leveraged when developing marine and hydrokinetic projects as well as exceptions to FERC licensing for hydrokinetic projects.

  17. HydroViz: evaluation of a web-based tool for improving hydrology education

    NASA Astrophysics Data System (ADS)

    Habib, E.; Ma, Y.; Williams, D.; Sharif, H.; Hossain, F.

    2012-02-01

    HydroViz is a web-based, student-centered, highly visual educational tool designed to support active learning in the field of Engineering Hydrology. The development of HydroViz is informed by recent advances in hydrologic data, numerical simulations, visualization and web-based technologies. An evaluation study was conducted to determine the effectiveness of HydroViz, to examine the buy-in of the program, and to identify project components that need to be improved. A total of 182 students from seven freshmen and junior-/senior-level undergraduate classes in three universities participated in the study over the course of two semesters (spring 2010 and fall 2010). Data sources included homework assignments, online surveys, and informal interviews with students. Descriptive statistics were calculated for homework and the survey. Qualitative analysis of students' comments and informal interview notes were also conducted to identify ideas and patterns. HydroViz was effective in facilitating students' learning and understanding of hydrologic concepts and increasing related skills. Students had positive perceptions of various features of HydroViz and they believe that HydroViz fits well in the curriculum. The experience with HydroViz was somewhat effective in raising freshmen civil engineering students' interest in hydrology. In general, HydroViz tend to be more effective with students in junior- or senior-level classes than students in freshmen classes. There does not seem to be obvious differences between different universities. Students identified some issues that can be addressed to improve HydroViz. Future adaptation and expansion studies are under planning to scale-up the application and utility of HydroViz into various hydrology and water-resource engineering curriculum settings.

  18. 76 FR 37806 - Ashton Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ... DEPARTMENT OF ENERGY [Project No. 14213-000] Ashton Hydro, LLC; Notice of Preliminary Permit... lands or waters owned by others without the owners' express permission. The proposed run-of-the-river... level and a maximum storage capacity of about 200 ac-ft; (3) a new intake on the upstream face of the...

  19. 75 FR 29335 - Rumford Falls Hydro, LLC; Notice of Application for Amendment of License, and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2333-068] Rumford Falls Hydro, LLC; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests May 18, 2010. Take notice that the following hydroelectric application has been filed with the Commission and is available for publi...

  20. Implications of the Bangor Hydro decision on FERC relicensings

    USGS Publications Warehouse

    Pizzi, L.

    1997-01-01

    In the next 15 years, over 400 existing nonfederal dams will require new licenses by the Federal Energy Regulatory Commission (FERC) in order to continue operations. In many cases, state or federal agencies have a unique opportunity to condition the hydropower licenses to protect environmental values. In 1996, the Court of Appeals for the District of Columbia Circuit issued an opinion striking down a mandatory license condition imposed by the U.S. Department of the Interior in a FERC relicensing. The case, Bangor Hydro-Electric Company v.Federal Energy Regulatory Commission, is instructive for agencies regarding the procedures to be followed in imposing mandatory FERC licensing conditions in the future. After Bangor Hydro, agencies should: (1) support their decisions by substantial evidence in the FERC record, (2) request applicant studies to support agency decisions and allow public comment on the decisions as a means to test the facts and analysis, and (3) consider intervening in a case to defend the condition on appeal. Bangor Hydro also raises, but does not decide, the issue of whether the agency imposing the mandatory condition should engage in balancing the economics of the hydropower project with the public resources affected by the project.

  1. 76 FR 16766 - ECOsponsible, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... feasibility of the Niagara River Community Hydro Project 2 (Niagara 2 Project or project) to be located on the... electricity to an onshore collection substation and point of interconnection switchyard; (3) an operations and...

  2. Hydrological Modeling in Alaska with WRF-Hydro

    NASA Astrophysics Data System (ADS)

    Elmer, N. J.; Zavodsky, B.; Molthan, A.

    2017-12-01

    The operational National Water Model (NWM), implemented in August 2016, is an instantiation of the Weather Research and Forecasting hydrological extension package (WRF-Hydro). Currently, the NWM only covers the contiguous United States, but will be expanded to include an Alaska domain in the future. It is well known that Alaska presents several hydrological modeling challenges, including unique arctic/sub-arctic hydrological processes not observed elsewhere in the United States and a severe lack of in-situ observations for model initialization. This project sets up an experimental version of WRF-Hydro in Alaska mimicking the NWM to gauge the ability of WRF-Hydro to represent hydrological processes in Alaska and identify model calibration challenges. Recent and upcoming launches of hydrology-focused NASA satellite missions such as the Soil Moisture Active Passive (SMAP) and Surface Water Ocean Topography (SWOT) expand the spatial and temporal coverage of observations in Alaska, so this study also lays the groundwork for assimilating these NASA datasets into WRF-Hydro in the future.

  3. HydroDesktop as a Community Designed and Developed Resource for Hydrologic Data Discovery and Analysis

    NASA Astrophysics Data System (ADS)

    Ames, D. P.

    2013-12-01

    As has been seen in other informatics fields, well-documented and appropriately licensed open source software tools have the potential to significantly increase both opportunities and motivation for inter-institutional science and technology collaboration. The CUAHSI HIS (and related HydroShare) projects have aimed to foster such activities in hydrology resulting in the development of many useful community software components including the HydroDesktop software application. HydroDesktop is an open source, GIS-based, scriptable software application for discovering data on the CUAHSI Hydrologic Information System and related resources. It includes a well-defined plugin architecture and interface to allow 3rd party developers to create extensions and add new functionality without requiring recompiling of the full source code. HydroDesktop is built in the C# programming language and uses the open source DotSpatial GIS engine for spatial data management. Capabilities include data search, discovery, download, visualization, and export. An extension that integrates the R programming language with HydroDesktop provides scripting and data automation capabilities and an OpenMI plugin provides the ability to link models. Current revision and updates to HydroDesktop include migration of core business logic to cross platform, scriptable Python code modules that can be executed in any operating system or linked into other software front-end applications.

  4. 77 FR 50682 - KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14423-000] KC Scoby Hydro... concrete gravity dam with a 183-foot-long spillway; (2) an existing impoundment having a surface area of 22 acres and a storage capacity of 52 acre-feet at an elevation of 1,080 feet mean sea level (msl); (3) a...

  5. 78 FR 12049 - Marlborough Hydro Associates; Ashuelot River Hydro, Inc.; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... information about this project can be viewed or printed on the eLibrary link of Commission's Web site at http... CFR 385.2001(a)(1) and the instructions on the Commission's Web site under http://www.ferc.gov/docs... registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your...

  6. 76 FR 79671 - Parker Knoll Hydro, LLC; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... project would be a closed-loop pumped storage system, with an initial fill from the existing Otter Creek...: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Parker Knoll Hydro, LLC., 975 South State... system; (12) approximately 1 mile of 345-kV transmission line; and (13) appurtenant facilities. The...

  7. Analysis of a pico tubular-type hydro turbine performance by runner blade shape using CFD

    NASA Astrophysics Data System (ADS)

    Park, J. H.; Lee, N. J.; Wata, J. V.; Hwang, Y. C.; Kim, Y. T.; Lee, Y. H.

    2012-11-01

    There has been a considerable interest recently in the topic of renewable energy. This is primarily due to concerns about environmental impacts of fossil fuels. Moreover, fluctuating and rising oil prices, increase in demand, supply uncertainties and other factors have led to increased calls for alternative energy sources. Small hydropower, among other renewable energy sources, has been evaluated to have adequate development value because it is a clean, renewable and abundant energy resource. In addition, small hydropower has the advantage of low cost development by using rivers, agricultural reservoirs, sewage treatment plants, waterworks and water resources. The main concept of the tubular-type hydro turbine is based on the difference in water pressure levels in pipe lines, where the energy which was initially wasted by using a reducing valve at the pipeline of waterworks, is collected by turbine in the hydro power generator. In this study, in order to acquire the performance data of a pico tubular-type hydro turbine, the output power, head and efficiency characteristics by different runner blade shapes are examined. The pressure and velocity distributions with the variation of guide vane and runner vane angle on turbine performance are investigated by using a commercial CFD code.

  8. Power Authority calls for wise investment in hydropower

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yould, E.P.

    Wise investment in hydropower is one of the most valuable long-term economic actions the state of Alaska can take. A review of the hydro projects shows that investigations needed for construction of the Susitna hydroelectric project will be initiated, while Green Lake and Solomon Gulch projects at Sitka and Valdez will enter their second construction season. Swan Lake and Terror Lake hydropower construction for Ketchikan and Kodiak will also be initiated in 1980 followed by Tyee Lake hydropower for Petersburg and Wrangell. Projects still under investigation which may prove feasible for construction in the future are at Cordova, Homer, Seward,more » Bristol Bay, the Tlingit-Haida area, the lower Kuskokwim and Yukon area, and at some smaller rural communities. Other communities may be able to develop wood or peat fueled generation, wile still others might be able to develop small tidal or wind power generation. The Alaska Power Authority is attempting to expedite these projects, and the end result should be a significant degree of electrical energy independence by the end of the next decade.« less

  9. Hydro power plants, an overview of the current types and technology

    NASA Astrophysics Data System (ADS)

    Tkáč, Štefan

    2018-03-01

    Despite the long history of hydropower technology and rising number of system harvesting energy from alternative sources, the constant research within hydro power sector becoming increasingly important as the power from water was and still is the leading alternative source of green energy generation, capitalized not necessarily within micro-urban structures only. The advantages of hydro systems involve their relatively low acquisition cost against durability, the possibility of gaining energy independence, relatively high flexibility and adaptability for spatial conditions and energy demands of the end users. Nowadays micro hydro systems could capitalize head range starting at 100cm and the efficiency of hydro systems in general ranges between 65-75% in micro and small applications climbing up to 96% in macro designs. It is mostly due to flexibility in applications, adaptability in combinations with other renewable energy systems and the ability to generate clean, stable, thus reliable energy that makes technical development the most vibrant and noticeable in the micro sphere.

  10. Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 3, appendix B: State of the art, trends, and potential growth of selected DSG technologies

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Present and future relatively small (30 MW) energy systems, such as solar thermal electric, photovoltaic, wind, fuel cell, storage battery, hydro, and cogeneration can help achieve national energy goals and can be dispersed throughout the distribution portion of an electric utility system. Based on current projections, it appears that dispersed storage and generation (DSG) electrical energy will comprise only a small portion, from 4 to 10 percent, of the national total by the end of this century. In general, the growth potential for DSG seems favorable in the long term because of finite fossil energy resources and increasing fuel prices. Recent trends, especially in the institutional and regulatory fields, favor greater use of the DSGs for the future.

  11. Monitoring and control requirement definition study for Dispersed Storage and Generation (DSG). Volume 3, appendix B: State of the art, trends, and potential growth of selected DSG technologies

    NASA Astrophysics Data System (ADS)

    1980-10-01

    Present and future relatively small (30 MW) energy systems, such as solar thermal electric, photovoltaic, wind, fuel cell, storage battery, hydro, and cogeneration can help achieve national energy goals and can be dispersed throughout the distribution portion of an electric utility system. Based on current projections, it appears that dispersed storage and generation (DSG) electrical energy will comprise only a small portion, from 4 to 10 percent, of the national total by the end of this century. In general, the growth potential for DSG seems favorable in the long term because of finite fossil energy resources and increasing fuel prices. Recent trends, especially in the institutional and regulatory fields, favor greater use of the DSGs for the future.

  12. Development and Validation of an Acid Mine Drainage Treatment Process for Source Water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lane, Ann

    Throughout Northern Appalachia and surrounding regions, hundreds of abandoned mine sites exist which frequently are the source of Acid Mine Drainage (AMD). AMD typically contains metal ions in solution with sulfate ions which have been leached from the mine. These large volumes of water, if treated to a minimum standard, may be of use in Hydraulic Fracturing (HF) or other industrial processes. This project’s focus is to evaluate an AMD water treatment technology for the purpose of providing treated AMD as an alternative source of water for HF operations. The HydroFlex™ technology allows the conversion of a previous environmental liabilitymore » into an asset while reducing stress on potable water sources. The technology achieves greater than 95% water recovery, while removing sulfate to concentrations below 100 mg/L and common metals (e.g., iron and aluminum) below 1 mg/L. The project is intended to demonstrate the capability of the process to provide AMD as alternative source water for HF operations. The second budget period of the project has been completed during which Battelle conducted two individual test campaigns in the field. The first test campaign demonstrated the ability of the HydroFlex system to remove sulfate to levels below 100 mg/L, meeting the requirements indicated by industry stakeholders for use of the treated AMD as source water. The second test campaign consisted of a series of focused confirmatory tests aimed at gathering additional data to refine the economic projections for the process. Throughout the project, regular communications were held with a group of project stakeholders to ensure alignment of the project objectives with industry requirements. Finally, the process byproduct generated by the HydroFlex process was evaluated for the treatment of produced water against commercial treatment chemicals. It was found that the process byproduct achieved similar results for produced water treatment as the chemicals currently in use. Further, the process byproduct demonstrated better settling characteristics in bench scale testing. The field testing conducted in the second project budget period demonstrated the ability of the HydroFlex technology to meet industry requirements for AMD water chemical composition so that it can be used as source water in HF activities. System and operational improvements were identified in an additional series of confirmatory tests to achieve competitive cost targets. Finally, the application of the HydroFlex process byproduct in produced water treatment was demonstrated, further supporting the commercial implementation of the technology. Overall, the project results demonstrate a path to the economic treatment of AMD to support its increased use as source water in HF, particularly in regions with limited local freshwater availability.« less

  13. HydroCube: an entity-relationship hydrogeological data model

    NASA Astrophysics Data System (ADS)

    Wojda, Piotr; Brouyère, Serge; Derouane, Johan; Dassargues, Alain

    2010-12-01

    Managing, handling and accessing hydrogeological information depends heavily on the applied hydrogeological data models, which differ between institutions and countries. The effective dissemination of hydrogeological information requires the convergence of such models to make hydrogeological information accessible to multiple users such as universities, water suppliers, and administration and research organisations. Furthermore, because hydrogeological studies are complex, they require a wide variety of high-quality hydrogeological data with appropriate metadata in clearly designed and coherent structures. A need exists, therefore, to develop and implement hydrogeological data models that cover, as much as possible, the full hydrogeological domain. A new data model, called HydroCube, was developed for the Walloon Region in Belgium in 2005. The HydroCube model presents an innovative holistic project-based approach which covers a full set of hydrogeological concepts and features, allowing for effective hydrogeological project management. The model stores data relating to the project locality, hydrogeological equipment, and related observations and measurements. In particular, it focuses on specialized hydrogeological field experiments such as pumping and tracer tests. This logical data model uses entity-relationship diagrams and it has been implemented in the Microsoft Access environment. It has been enriched with a fully functional user interface.

  14. Trans-African Hydro-Meteorological Observatory (TAHMO): A network to monitor weather, water, and climate in Africa

    NASA Astrophysics Data System (ADS)

    Van De Giesen, N.; Hut, R.; Andreini, M.; Selker, J. S.

    2013-12-01

    The Trans-African Hydro-Meteorological Observatory (TAHMO) has a goal to design, build, install and operate a dense network of hydro-meteorological monitoring stations in sub-Saharan Africa; one every 35 km. This corresponds to a total of 20,000 stations. By applying ICT and innovative sensors, each station should cost not more than $500. The stations would be placed at schools and integrated in the environmental curriculum. Data will be combined with models and satellite observations to obtain a very complete insight into the distribution of water and energy stocks and fluxes. Within this project, we have built a prototype of an acoustic disdrometer (rain gauge) that can be produced for much less than the cost of a commercial equivalent with the same specifications. The disdrometer was developed in The Netherlands and tested in Tanzania for a total project cost of Euro 5000. First tests have been run at junior high schools in Ghana to incorporate hydro-meteorological measurements in the science curriculum. The latest activity concerns the organization of a crowdsourcing competitions across Africa to address business development and the design and building of new robust sensors. This has resulted in a wide network throughout the continent to bring this program forward.

  15. Climate Change Impacts to Hydro Power Reservoir Systems in British Columbia, Canada: Modelling, Validation and Projection of Historic and Future Streamflow and Snowpack

    NASA Astrophysics Data System (ADS)

    Bennett, K. E.; Schnorbus, M.; Werner, A. T.; Berland, A. J.

    2010-12-01

    The British Columbia Hydro Electric Corporation (BC Hydro) has a mandate to provide clean, renewable and reliable sources of hydro-electric power into the future, hence managing those resources in the context of climate change will be an important component of reservoir operational planning in British Columbia. The Pacific Climate Impacts Consortium (www.PacificClimate.org) has implemented the Variable Infiltration Capacity hydrologic model parameterized at 1/16th degree (~32 km2) to provide BC Hydro with future projections of changes to streamflow and snowpack to the 2050s. The headwaters of the Peace, Columbia, and Campbell River basins were selected for study; the Upper Peace River basin (101,000 km2) is a snowmelt-dominated watershed, and the Upper Columbia River Basin (104,000 km2) has a mixed snowmelt-glacier melt runoff regime, with glacier runoff contributing up to 15 to 20% of late summer discharge. The Upper Campbell River watershed (1,200 km2) has a mixed rainfall and snowmelt (hybrid) hydrologic regime. The model has been calibrated using historical streamflow observations and validated against these observations, as well as automated snow pillow measurements. Future streamflow changes are estimated based on eight Global Climate Models (GCMs) from the CMIP3 suite, downscaled using the Bias Correction Spatial Downscaling (BCSD) technique, run under three emissions scenarios (A2, A1B and B1; A1B is specifically reported on herein). Climate impacts by the 2050s in the three watersheds illustrate an increase in annual average temperature and precipitation ranging between +2.2°C to +2.8°C and +2% to +10% depending on basin, and an annual change in streamflow of -1% to +12% for the three watersheds. Changes are more profound on the seasonal time-scale and differ across basins. Summer streamflow in the Upper Campbell River watershed is projected to decline by -60%, where as the Upper Peace and Columbia systems are projected to decline by -25% and -22%, respectively. Streamflow is projected to increase during winter months for all basins, ranging from increases of +54% (Upper Campbell), +77% (Upper Peace) to +94% (Upper Columbia). These changes in streamflow illustrate a shift towards more rainfall dominated systems with lower snowpacks during the winter months, particularly in the Campbell system (shifting from 23% to 13% snow dominated by the 2050s), which is located at a relatively low elevation and proximal to the Pacific Ocean. Shifts in the distribution of water resources, and in particular snowpack reserves, may require BC Hydro to reconsider their operational planning framework for impacted systems.

  16. High Resolution Land Surface Modeling over the NEF Basin in the Chilean Patagonia

    NASA Astrophysics Data System (ADS)

    Somos-Valenzuela, M. A.

    2017-12-01

    Stakeholders and policy makers perceive that water and climate change adaptation are among the most vulnerable issues that need to be addressed. Therefore, there is a need not only from the scientific community but also from the society to use integrated methodologies that link advances in climatology with hydrology to provide data that helps us to provide adaptation strategies. The Andes and the Chilean-Argentinean Patagonia have been steadily warming up to 0.5 Celsius degrees per decades at the same time that precipitation is decreasing by 10 to 12 % per decade. In the future is expected that these trends will continue which will have impacts in the annual water budget. The Chilean Patagonia has brought a lot of attention during last decade because two hydroelectric project seek to build dams in one of the most pristine environments in the world. Also, in the Baker River basin a series of Glacier Lakes Outburst Flood have occurred which is perceived as an undeniable consequence of the effects of climate change in the glacier system. Major attention is mainly situated in the impact of climate change in glaciers contribution to sea level rise, GLOF studies given the numerous supra glacier lakes that are forming, and the study of stream flow point observation. The objectives of this research are: 1) Study the historical trends of precipitation, temperature, land cover changes and streamflow available in the Baker Basin; 2) Use a couple glacier model with a land surface model to predict the evolution of glaciers and their effects in the water availability. To address these objectives, I will analyze trends in hydro meteorology observations and correlation with trends in Land Cover Changes. Use the WRF-hydro framework to generate data in a small watershed that will allow to calibrate a high resolution hydro glaciology model to understand the partition between glaciered and non-glaciered runoff. The parameters estimated in the small domain could have the potential to be transfer to a regional setting and pseudo climate data will be used to study the impacts of climate change in the Baker River Basin system hydrology. The expected results are: 1) Land cover change maps and trends, and their relationship to changes in streamflow, and climate observations. 2) a calibrated hydro glaciology model for a catchment in the NEF river Basin

  17. 77 FR 59389 - Hawks Nest Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    .... Name of Project: Hawks Nest Hydroelectric Project (P-2512-069) and Glen Ferris Hydroelectric Project (P... of Gauley Bridge, and Glen Ferris Hydroelectric Project is on the Kanawha River in the vicinity of the Town of Glen Ferris, both within Fayette County, West Virginia. The projects do not affect federal...

  18. Seasonal-Scale Optimization of Conventional Hydropower Operations in the Upper Colorado System

    NASA Astrophysics Data System (ADS)

    Bier, A.; Villa, D.; Sun, A.; Lowry, T. S.; Barco, J.

    2011-12-01

    Sandia National Laboratories is developing the Hydropower Seasonal Concurrent Optimization for Power and the Environment (Hydro-SCOPE) tool to examine basin-wide conventional hydropower operations at seasonal time scales. This tool is part of an integrated, multi-laboratory project designed to explore different aspects of optimizing conventional hydropower operations. The Hydro-SCOPE tool couples a one-dimensional reservoir model with a river routing model to simulate hydrology and water quality. An optimization engine wraps around this model framework to solve for long-term operational strategies that best meet the specific objectives of the hydrologic system while honoring operational and environmental constraints. The optimization routines are provided by Sandia's open source DAKOTA (Design Analysis Kit for Optimization and Terascale Applications) software. Hydro-SCOPE allows for multi-objective optimization, which can be used to gain insight into the trade-offs that must be made between objectives. The Hydro-SCOPE tool is being applied to the Upper Colorado Basin hydrologic system. This system contains six reservoirs, each with its own set of objectives (such as maximizing revenue, optimizing environmental indicators, meeting water use needs, or other objectives) and constraints. This leads to a large optimization problem with strong connectedness between objectives. The systems-level approach used by the Hydro-SCOPE tool allows simultaneous analysis of these objectives, as well as understanding of potential trade-offs related to different objectives and operating strategies. The seasonal-scale tool will be tightly integrated with the other components of this project, which examine day-ahead and real-time planning, environmental performance, hydrologic forecasting, and plant efficiency.

  19. Representing Hydrologic Models as HydroShare Resources to Facilitate Model Sharing and Collaboration

    NASA Astrophysics Data System (ADS)

    Castronova, A. M.; Goodall, J. L.; Mbewe, P.

    2013-12-01

    The CUAHSI HydroShare project is a collaborative effort that aims to provide software for sharing data and models within the hydrologic science community. One of the early focuses of this work has been establishing metadata standards for describing models and model-related data as HydroShare resources. By leveraging this metadata definition, a prototype extension has been developed to create model resources that can be shared within the community using the HydroShare system. The extension uses a general model metadata definition to create resource objects, and was designed so that model-specific parsing routines can extract and populate metadata fields from model input and output files. The long term goal is to establish a library of supported models where, for each model, the system has the ability to extract key metadata fields automatically, thereby establishing standardized model metadata that will serve as the foundation for model sharing and collaboration within HydroShare. The Soil Water & Assessment Tool (SWAT) is used to demonstrate this concept through a case study application.

  20. ORION Project-(SPLASH) Structural Passive Landing Attenuation fo

    NASA Image and Video Library

    2011-07-12

    ORION Project-(SPLASH) Structural Passive Landing Attenuation for Survivability of Human Crew (BTA) Boiler Plate Test Article Water Impact Test-Pot Phase"0" Test Tested at the Hydro Impact Basin at the Landing and Impact Research Facility (Gantry)

  1. Impact of hydroelectric development upon a northern Manitoba native community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waldram, J.B.

    1983-01-01

    This dissertation describes the process of underdevelopment among the Cree Indian people of South Indian Lake, in Northern Manitoba, Canada, following the construction of the Churchill-Nelson River Hydro Project in 1975. The dissertation seeks to link the ecological, political, economic, socio-cultural and health aspects of the impact of the hydro project within the framework of the historical process of underdevelopment as it has occurred in Latin America, among Native people in the United States, and among Native people in Northern Canada. Utilizing both qualitative and quantitative data, a process of increased dependence is described as the product of two relatedmore » processes. The first process is the impairment of the local commercial and domestic economy caused by the flooding of Southern Indian Lake, which has resulted in a decline in local productivity. The second process is the enhancement of consumerism through rising consumer expectations and a post-project increase in available goods and services which the people are increasingly unable to afford. The overall result has been a process of economic divergence at the local level. The dissertation concludes that the process of underdevelopment which has occurred in South Indian Lake has been the result primarily of changes in the local ecological system caused by the construction of the hydro project. These ecological changes have, in turn, resulted in secondary changes in the socio-economic system.« less

  2. HydroViz: design and evaluation of a Web-based tool for improving hydrology education

    NASA Astrophysics Data System (ADS)

    Habib, E.; Ma, Y.; Williams, D.; Sharif, H. O.; Hossain, F.

    2012-10-01

    HydroViz is a Web-based, student-centered, educational tool designed to support active learning in the field of Engineering Hydrology. The design of HydroViz is guided by a learning model that is based on learning with data and simulations, using real-world natural hydrologic systems to convey theoretical concepts, and using Web-based technologies for dissemination of the hydrologic education developments. This model, while being used in a hydrologic education context, can be adapted in other engineering educational settings. HydroViz leverages the free Google Earth resources to enable presentation of geospatial data layers and embed them in web pages that have the same look and feel of Google Earth. These design features significantly facilitate the dissemination and adoption of HydroViz by any interested educational institutions regardless of their access to data or computer models. To facilitate classroom usage, HydroViz is populated with a set of course modules that can be used incrementally within different stages of an engineering hydrology curriculum. A pilot evaluation study was conducted to determine the effectiveness of the HydroViz tool in delivering its educational content, to examine the buy-in of the program by faculty and students, and to identify specific project components that need to be further pursued and improved. A total of 182 students from seven freshmen and senior-level undergraduate classes in three universities participated in the study. HydroViz was effective in facilitating students' learning and understanding of hydrologic concepts and increasing related skills. Students had positive perceptions of various features of HydroViz and they believe that HydroViz fits well in the curriculum. In general, HydroViz tend to be more effective with students in senior-level classes than students in freshmen classes. Lessons gained from this pilot study provide guidance for future adaptation and expansion studies to scale-up the application and utility of HydroViz and other similar systems into various hydrology and water-resource engineering curriculum settings. The paper presents a set of design principles that contribute to the development of other active hydrology educational systems.

  3. Reservoir and canal system regulation for operation of the Raymond Reservoir Hydro Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, H.D.; Davidson, B.

    1995-12-31

    In 1989 LIMA Engineering Ltd. of Lethbridge, Alberta, Canada and Tudor Engineering Company of Oakland, California investigated the feasibility of installing a hydroelectric facility for the St. Mary River Irrigation District at Raymond Chute. This chute is a 29.3 m (96 ft) drop structure on the District`s main canal outside of the town of Raymond in southern Alberta. The chute discharges into the east end of Raymond Reservoir, a small regulating reservoir. The engineering team concluded that the project could be made more attractive by combining the drop at Raymond Chute with an additional 17.7 m (58 ft) of headmore » available at the upstream Milk River Ridge Reservoir. The result was the 20 MW Raymond Reservoir Hydro Project which went into commercial operation in May, 1994. Combining these two drops in elevation required the construction of a complete bypass system with a new approach canal and tailrace discharging into the west end of Raymond Reservoir, approximately 5 km (3 miles) west of the Raymond Chute. The system allows up to 56.7 cms (2,000 cfs) to be diverted through the powerhouse and thereby bypass Milk River Ridge Reservoir, Raymond Chute and approximately 6.5 km (4 miles) of canal. No synchronous bypass valve or spill facility was provided at the powerhouse. Rather, a system of rehabilitated or new check structures and controls were provided to automatically transfer flow from the power canal to the original system and thereby maintain a constant pre-set discharge downstream of the powerhouse following load rejections. This constant discharge is essential for meeting downstream irrigation demand.« less

  4. Electrifying Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reinemer, V.

    Alaska's diverse systems for electric power include only 4% by private utilities. Large distances and small markets make transmission impractical for the most part. Rates are variable, although the state average is low. Energy sources, except nuclear, are abundant: half the US coal reserves are in Alaska. In addition, it has geothermal, tidal, biomass, solar, wind, and hydroelectric power. Energy construction and study programs are centered in the Alaska Power Authority and include using waste heat from village diesel generators. Hydro potential is good, but access, distances, and environmental effects must be considered. The Terror Lake, Tyee Lake, Swan Lake,more » and Susitna projects are described and transmission construction, including the 345-kW Railbelt intertie, is discussed. 1 figure.« less

  5. Hydro turbine governor’s power control of hydroelectric unit with sloping ceiling tailrace tunnel

    NASA Astrophysics Data System (ADS)

    Fu, Liang; Wu, Changli; Tang, Weiping

    2018-02-01

    The primary frequency regulation and load regulation transient process when the hydro turbine governor is under the power mode of hydropower unit with sloping ceiling tailrace are analysed by field test and numerical simulation in this paper. A simulation method based on “three-zone model” to simulate small fluctuation transient process of the sloping ceiling tailrace is proposed. The simulation model of hydraulic turbine governor power mode is established by governor’s PLC program identification and parameter measurement, and the simulation model is verified by the test. The slow-fast-slow “three-stage regulation” method which can improve the dynamic quality of hydro turbine governor power mode is proposed. The power regulation strategy and parameters are optimized by numerical simulation, the performance of primary frequency regulation and load regulation transient process when the hydro turbine governor is under power mode are improved significantly.

  6. 78 FR 7770 - Boyce Hydro Power, LLC; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .... Description of Application: The licensee proposes to replace one of the project's three existing turbine/generator units with a new unit. The project's maximum hydraulic capacity would remain the same but the new...

  7. ORION Project-(SPLASH) Structural Passive Landing Attenuation fo

    NASA Image and Video Library

    2011-07-21

    ORION Project-(SPLASH) Structural Passive Landing Attenuation for Survivability of Human Crew (BTA) Boiler Plate Test Article Water Impact Test-Pot Phase"0" Test POT#2 Tested at the Hydro Impact Basin at the Landing and Impact Research Facility (Gantry)

  8. ORION Project-(SPLASH) Structural Passive Landing Attenuation fo

    NASA Image and Video Library

    2011-12-13

    ORION Project-(SPLASH) Structural Passive Landing Attenuation for Survivability of Human Crew (BTA) Boiler Plate Test Article Water Impact Test-Pit Phase 4 Test or Pit 4 Tested at the Hydro Impact Basin at the Landing and Impact Research Facility (Gantry)

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hennagir, T.

    China's peaking power need continues to drive a highly competitive market for pumped storage turbines. Two contract awards in this growing Far East region have increased visibility of Kvaerner Energy a.s. and Voith Hydro Inc. In October, Kvaerner was awarded a $150 million contract for six 300 MW reversible pump turbines for the 1,800 MW Tianhuangping Pumped Storage Project near Zhejing (Shanghai). The equipment and the contract have been lauded for their significance: The award is the largest of their kind in the world. Voith Hydro's contract to furnish and install four 204 MW pump turbines for the 816 MWmore » Shisanling PUmped Storage Project north of Beijing has drawn attention as well. Not only was the July 1992 contract signing ceremony conducted inside the Great Hall of the People in Beijing, but Chinese Premier Li Peng officiated at the project's groundbreaking ceremony.« less

  10. 77 FR 24197 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... Drawing Mississippi 8 Hydro, LLC Project No. 13010-002. FFP Project 98, LLC Project No. 14272-000. The..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  11. 77 FR 9915 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... Drawing Lock+ Hydro Friends Fund XLI Project No. 14182-000 FFP Project 54, LLC Project No. 14192-000 The... her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  12. 78 FR 16849 - Fall Creek Hydro, LLC, Oregon; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12778-004] Fall Creek... Office of Energy Projects has reviewed the application for an original license to construct the Fall...-megawatt project would be located on Fall Creek in Lane County, Oregon, near the towns of Springfield and...

  13. 75 FR 57745 - FPL Energy Maine Hydro LLC; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... Unit 3 of the project by rewinding the generator and replacing the turbine runner with a more efficient runner. The proposed upgrade would increase the installed and hydraulic capacities of the project by 5.7...

  14. How can small hydro energy and other renewable energy mitigate impact of climate change in remote Central Africa: Cameroon case study.

    NASA Astrophysics Data System (ADS)

    Kenfack, Joseph; Bignom, Blaise

    2015-04-01

    Central Africa owns important renewable energy potential, namely hydro, solar and biomass. This important potential is still suffering from poor development up to the point where the sub region is still abundantly using the fossil energy and biomass as main power source. This is harmful to the climate and the situation is still ongoing. The main cause of the poor use of renewable energy is the poor management of resources by governments who have not taken the necessary measures to boost the renewable energy sector. Since the region is experiencing power shortage, thermal plants are among other solutions planned or under construction. Firewood is heavily used in remote areas without a sustainability program behind. This solution is not environment friendly and hence is not a long term solution. Given the fact that the region has the highest hydro potential of the continent, up to one-quarter of the world's tropical forest, important oil production with poor purchase power, the aim of this paper is to identify actions for improved access to sustainable, friendly, affordable energy services to users as well as a significant improvement of energy infrastructure in Central Africa and the promotion of small hydro and other renewable energy. The work will show at first the potential for the three primary energy sources which are solar, biomass and hydro while showing where available the level of development, with an emphasis on small hydro. Then identified obstacles for the promotion of clean energy will be targeted. From lessons learned, suggestions will be made to help the countries develop an approach aiming at developing good clean energy policy to increase the status of renewable energy and better contribute to fight against climate change. Cameroon has a great renewable energy potential and some data are available on energy. From the overview of institutional structure reform of the Cameroon power sector and assessments, specific suggestions based on the weaknesses of the current management of renewable energy sources will be made for the enhancement of the renewable energy and hence sustain energy access and security in general and in remote areas in particular where the fight against poverty is more difficult. We will use several documents, soft and hard from institutions in the region and abroad, and maps when available. |End Text|

  15. DECOVALEX Project: from 1992 to 2007

    NASA Astrophysics Data System (ADS)

    Tsang, Chin-Fu; Stephansson, Ove; Jing, Lanru; Kautsky, Fritz

    2009-05-01

    The DECOVALEX project is a unique international research collaboration, initiated in 1992, for advancing the understanding and mathematical modelling of coupled thermo-hydro-mechanical (THM) and thermo-hydro-mechanical-chemical (THMC) processes in geological systems—subjects of importance for performance assessment of radioactive waste repositories in geological formations. From 1992 up to 2007, the project has made important progress and played a key role in the development of numerical modelling of coupled processes in fractured rocks and buffer/backfill materials. The project has been conducted by research teams supported by a large number of radioactive-waste-management organizations and regulatory authorities, including those of Canada, China, Finland, France, Japan, Germany, Spain, Sweden, UK, and the USA. Through this project, in-depth knowledge has been gained of coupled THM and THMC processes associated with nuclear waste repositories, as well as numerical simulation models for their quantitative analysis. The knowledge accumulated from this project, in the form of a large number of research reports and international journal and conference papers in the open literature, has been applied effectively in the implementation and review of national radioactive-waste-management programmes in the participating countries. This paper presents an overview of the project.

  16. 77 FR 47622 - TransCanada Hydro Northeast Inc.; FirstLight Power Resources; Notice of Environmental Site Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ....; FirstLight Power Resources; Notice of Environmental Site Review In anticipation of the filing of a... Project No. 1904), and two projects owned and operated by FirstLight Power Resources in Massachusetts.... Location: Vernon Station, 152 Governor Hunt Road, Vernon VT 05354. FirstLight's Projects FirstLight will...

  17. 76 FR 50726 - Riverbank Hydro No. 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... (FPA), proposing to study the feasibility of the Tuttle Creek Hydroelectric Project (Tuttle Creek Project or project) to be located at the U.S. Army Corps of Engineers' (Corps) Tuttle Creek Dam, on Big Blue River, near Manhattan, Riley County, Kansas. The sole purpose of a preliminary permit, if issued...

  18. Study on Reventment-Protected and Non-Bottom-Protected Plunge Pool of High Arch Dam

    NASA Astrophysics Data System (ADS)

    Yingkui, Wang; Quxiu, Cao; Fanhui, Kong

    2018-05-01

    Lots of high arch dam have the characteristics of “High head, Large discharge and Narrow river valley”, therefore, the security researches of energy dissipation were always the focus in these hydro-projects. Statistically, the trajectory type energy dissipation is the most widely used in the built high arch dams, and the water plunge poor were always set downstream the dam body. However, the widely used protected plunge poor need large investment with the disadvantage of complicated operation and maintenance. Along with the construction of concrete high arch dam in the Southwest China, the river overburden and water cushion were deep in dam site, which is becoming a new characteristic of these hydro-projects. Accordingly, the deep water cushion can be used for the energy dissipation design, such as the “Reventment-Protected and Non-Bottom-Protected Plunge Pool”, which has the advantage of more simplified project design and more economy investment.

  19. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    NASA Astrophysics Data System (ADS)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  20. The HydroServer Platform for Sharing Hydrologic Data

    NASA Astrophysics Data System (ADS)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its parts in advancing hydrologic research. Details of the CUAHSI HIS can be found at http://his.cuahsi.org, and HydroServer codeplex site http://hydroserver.codeplex.com.

  1. Jet-induced medium excitation in γ-hadron correlation at RHIC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, Wei; Cao, Shanshan; Luo, Tan

    Both jet transport and jet-induced medium excitation are investigated simultaneously within the coupled Linear Boltzmann Transport and hydro (CoLBT-hydro) model. In this coupled approach, energy-momentum deposition from propagating jet shower partons in the elastic and radiation processes is taken as a source term in hydrodynamics and the hydro background for LBT simulation is updated for next time step. We use CoLBT-hydro model to simulate γ-jet events of Au+Au collisions at RHIC. Hadron spectra from both the hadronization of jet shower partons and jet-induced medium excitation are calculated and compared to experimental data. Parton energy loss of jet shower partons leadsmore » to the suppression of hadron yields at large z T = p h T/p γ T while medium excitations leads to enhancement of hadron yields at small z T. Meanwhile, a significant broadening of low p T hadron yields and the depletion of soft hadrons in the γ direction are observed in the calculation of γ-hadron angular correlation.« less

  2. Jet-induced medium excitation in γ-hadron correlation at RHIC

    DOE PAGES

    Chen, Wei; Cao, Shanshan; Luo, Tan; ...

    2017-09-25

    Both jet transport and jet-induced medium excitation are investigated simultaneously within the coupled Linear Boltzmann Transport and hydro (CoLBT-hydro) model. In this coupled approach, energy-momentum deposition from propagating jet shower partons in the elastic and radiation processes is taken as a source term in hydrodynamics and the hydro background for LBT simulation is updated for next time step. We use CoLBT-hydro model to simulate γ-jet events of Au+Au collisions at RHIC. Hadron spectra from both the hadronization of jet shower partons and jet-induced medium excitation are calculated and compared to experimental data. Parton energy loss of jet shower partons leadsmore » to the suppression of hadron yields at large z T = p h T/p γ T while medium excitations leads to enhancement of hadron yields at small z T. Meanwhile, a significant broadening of low p T hadron yields and the depletion of soft hadrons in the γ direction are observed in the calculation of γ-hadron angular correlation.« less

  3. Joint atmospheric-terrestrial water balances for East Africa: a WRF-Hydro case study for the upper Tana River basin

    NASA Astrophysics Data System (ADS)

    Kerandi, Noah; Arnault, Joel; Laux, Patrick; Wagner, Sven; Kitheka, Johnson; Kunstmann, Harald

    2018-02-01

    For an improved understanding of the hydrometeorological conditions of the Tana River basin of Kenya, East Africa, its joint atmospheric-terrestrial water balances are investigated. This is achieved through the application of the Weather Research and Forecasting (WRF) and the fully coupled WRF-Hydro modeling system over the Mathioya-Sagana subcatchment (3279 km2) and its surroundings in the upper Tana River basin for 4 years (2011-2014). The model setup consists of an outer domain at 25 km (East Africa) and an inner one at 5-km (Mathioya-Sagana subcatchment) horizontal resolution. The WRF-Hydro inner domain is enhanced with hydrological routing at 500-m horizontal resolution. The results from the fully coupled modeling system are compared to those of the WRF-only model. The coupled WRF-Hydro slightly reduces precipitation, evapotranspiration, and the soil water storage but increases runoff. The total precipitation from March to May and October to December for WRF-only (974 mm/year) and coupled WRF-Hydro (940 mm/year) is closer to that derived from the Climate Hazards Group Infrared Precipitation with Stations (CHIRPS) data (989 mm/year) than from the TRMM (795 mm/year) precipitation product. The coupled WRF-Hydro-accumulated discharge (323 mm/year) is close to that observed (333 mm/year). However, the coupled WRF-Hydro underestimates the observed peak flows registering low but acceptable NSE (0.02) and RSR (0.99) at daily time step. The precipitation recycling and efficiency measures between WRF-only and coupled WRF-Hydro are very close and small. This suggests that most of precipitation in the region comes from moisture advection from the outside of the analysis domain, indicating a minor impact of potential land-precipitation feedback mechanisms in this case. The coupled WRF-Hydro nonetheless serves as a tool in quantifying the atmospheric-terrestrial water balance in this region.

  4. 76 FR 16408 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLV..... Project No. 13741-000. FFP Missouri 9, LLC Project No. 13748-000... random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  5. 76 FR 16408 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XXXVII.. Project No. 13738-000. FFP Missouri 6, LLC Project No. 13761-000... random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  6. 76 FR 16408 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLII.... Project No. 13739-000. FFP Missouri 10, LLC Project No. 13751... conduct a random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  7. Negotiator's checklist: success through preparation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilds, L.J.

    In gaining environmental approval for a hydro project, negotiation is a necessity. Strategies for maximizing the success of negotiations are presented. The case study of successful negotiations by the Kodiak Electric Association concerning the Terror Lake project on Kodiak Island, Alaska, is presented. The utility of bringing in professional mediators is discussed.

  8. Recovery Act. Development and Validation of an Advanced Stimulation Prediction Model for Enhanced Geothermal System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gutierrez, Marte

    The research project aims to develop and validate an advanced computer model that can be used in the planning and design of stimulation techniques to create engineered reservoirs for Enhanced Geothermal Systems. The specific objectives of the proposal are to: 1) Develop a true three-dimensional hydro-thermal fracturing simulator that is particularly suited for EGS reservoir creation. 2) Perform laboratory scale model tests of hydraulic fracturing and proppant flow/transport using a polyaxial loading device, and use the laboratory results to test and validate the 3D simulator. 3) Perform discrete element/particulate modeling of proppant transport in hydraulic fractures, and use the resultsmore » to improve understand of proppant flow and transport. 4) Test and validate the 3D hydro-thermal fracturing simulator against case histories of EGS energy production. 5) Develop a plan to commercialize the 3D fracturing and proppant flow/transport simulator. The project is expected to yield several specific results and benefits. Major technical products from the proposal include: 1) A true-3D hydro-thermal fracturing computer code that is particularly suited to EGS, 2) Documented results of scale model tests on hydro-thermal fracturing and fracture propping in an analogue crystalline rock, 3) Documented procedures and results of discrete element/particulate modeling of flow and transport of proppants for EGS applications, and 4) Database of monitoring data, with focus of Acoustic Emissions (AE) from lab scale modeling and field case histories of EGS reservoir creation.« less

  9. Recovery Act. Development and Validation of an Advanced Stimulation Prediction Model for Enhanced Geothermal Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gutierrez, Marte

    2013-12-31

    This research project aims to develop and validate an advanced computer model that can be used in the planning and design of stimulation techniques to create engineered reservoirs for Enhanced Geothermal Systems. The specific objectives of the proposal are to; Develop a true three-dimensional hydro-thermal fracturing simulator that is particularly suited for EGS reservoir creation; Perform laboratory scale model tests of hydraulic fracturing and proppant flow/transport using a polyaxial loading device, and use the laboratory results to test and validate the 3D simulator; Perform discrete element/particulate modeling of proppant transport in hydraulic fractures, and use the results to improve understandmore » of proppant flow and transport; Test and validate the 3D hydro-thermal fracturing simulator against case histories of EGS energy production; and Develop a plan to commercialize the 3D fracturing and proppant flow/transport simulator. The project is expected to yield several specific results and benefits. Major technical products from the proposal include; A true-3D hydro-thermal fracturing computer code that is particularly suited to EGS; Documented results of scale model tests on hydro-thermal fracturing and fracture propping in an analogue crystalline rock; Documented procedures and results of discrete element/particulate modeling of flow and transport of proppants for EGS applications; and Database of monitoring data, with focus of Acoustic Emissions (AE) from lab scale modeling and field case histories of EGS reservoir creation.« less

  10. 75 FR 73064 - Notice of Competing Preliminary Permit Applications Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... hydropower at the U.S. Army Corps of Engineers (Corps) C.W. Bill Young Lock and Dam located on the Allegheny... the proposed C.W. Bill Young Lock and Dam Projects: Lock+ Hydro Friends Fund XXXIX's project (Project... attached to the downstream side of the Corps dam which would support one frame module; (2) each frame...

  11. Le role strategique des representations sociales a caractere paysager dans le mouvement de recuperation des rivieres a des fins recreatives

    NASA Astrophysics Data System (ADS)

    Tremblay, Francois

    Historically, the rivers of Quebec have played outstanding parts in the territory cultural and political establishment, in the homeland discovery and colonization processes, and also in its economic development. One after another, transportation, trade, log driving and hydroelectricity production have been the dominant usage on these watercourses, and any other users had to give in. For the last thirty years, the wastewater cleaning efforts, the watercourse public access development as well as the withdrawal on some pollution producing practices like log driving, have given rise to a new recreational usage on many of these watercourses. In reality, this recreational usage barely put up with the magnitude of the hydro electricity production. This results in conflicts with increasing rate and intensity. The recreational users' demands are taken in consideration by the hydro electricity projects participants. However this consideration doesn't seem to satisfy the recreational users' expectations due to fundamental opposed viewpoints and principles which are being promoted by each group. Such radical divergence between these two groups introduces the notion of strategy being promoted by one group to be able to pressure the other group's practices. These strategies development depends on the participants' ability to force social issues upon the others pressing them to reconsider their own underlying principles. In the case of the conflict opposing the recreational wastewater industry with the small private hydroelectric projects on the Gatineau River, the recreational users, with the use of recontextualisation (or reframing of information) processes have been able to slow down and even momentarily stop hydro electric projects there. These recontextualisation processes are based on landscape related social representations which emphasize the aesthetic, emblematic and identity dimensions of the Gatineau River. These social representations introduce several paradoxes in the conflict between the recreational whitewater and hydroelectricity industries. These paradoxes force a reassessment on the traditional ways of dealing with (a) the area where the participants have an effect on (b) the temporal aspects of the issues, as well as (c) the social reference rationalizing their actions. In addition, these three recontextualisations, (spatial, temporal and social) put forward new ways about how to intervene on the river. These proposals, while relying on a coherent outlook on the world, are carried out into a local scale society building project, the landscape of a natural Gatineau river project. The research course of action developed for this thesis allows understanding the richness and intensity of the participants' radicalism experience. Beyond the typical "not in my backyard" reaction, the extreme oppositions between different participants quite often reveal some consistent, multifaceted, rightful and operational outlooks on the world. To understand ambitions, motivations and the projects, underlying the extremism of the participants, allow considering this radicalism from a viewpoint that is constructive for the participants as a whole, involved in territory planning.

  12. THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be sharedmore » between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.« less

  13. NASA Fuel Tank Wireless Power and Signal Study

    NASA Technical Reports Server (NTRS)

    Merrill, Garrick

    2015-01-01

    Hydro Technologies has developed a custom electronics and mechanical framework for interfacing with off-the-shelf sensors to achieve through barrier sensing solutions. The core project technology relies on Hydro Technologies Wireless Power and Signal Interface (Wi psi) System for transmitting data and power wirelessly using magnetic fields. To accomplish this, Wi psi uses a multi-frequency local magnetic field to produce magnetic fields capable of carrying data and power through almost any material such as metals, seawater, concrete, and air. It will also work through layers of multiple materials.

  14. Improving hydropower choices via an online and open access tool

    PubMed Central

    Vilela, Thais; Reid, John

    2017-01-01

    This paper describes and validates the HydroCalculator Tool developed by Conservation Strategy Fund. The HydroCalculator Tool allows researchers, policy-makers and citizens to easily assess hydropower feasibility, by calculating traditional financial indicators, such as the levelized cost of energy, as well as greenhouse gas emissions and the economic net present value including emissions costs. Currently, people other than project developers have limited or no access to such information, which stifles informed public debate on electric energy options. Within this context, the use of the HydroCalculator Tool may contribute to the debate, by facilitating access to information. To validate the tool’s greenhouse gas calculations, we replicate two peer-reviewed articles that estimate greenhouse gas emissions from different hydropower plants in the Amazon basin. The estimates calculated by the HydroCalculator Tool are similar to the ones found in both peer-reviewed articles. The results show that hydropower plants can lead to greenhouse gas emissions and that, in some cases, these emissions can be larger than those of alternative energy sources producing the same amount of electricity. PMID:28650968

  15. Improving hydropower choices via an online and open access tool.

    PubMed

    Vilela, Thais; Reid, John

    2017-01-01

    This paper describes and validates the HydroCalculator Tool developed by Conservation Strategy Fund. The HydroCalculator Tool allows researchers, policy-makers and citizens to easily assess hydropower feasibility, by calculating traditional financial indicators, such as the levelized cost of energy, as well as greenhouse gas emissions and the economic net present value including emissions costs. Currently, people other than project developers have limited or no access to such information, which stifles informed public debate on electric energy options. Within this context, the use of the HydroCalculator Tool may contribute to the debate, by facilitating access to information. To validate the tool's greenhouse gas calculations, we replicate two peer-reviewed articles that estimate greenhouse gas emissions from different hydropower plants in the Amazon basin. The estimates calculated by the HydroCalculator Tool are similar to the ones found in both peer-reviewed articles. The results show that hydropower plants can lead to greenhouse gas emissions and that, in some cases, these emissions can be larger than those of alternative energy sources producing the same amount of electricity.

  16. Comparison of Hydrodynamic Load Predictions Between Engineering Models and Computational Fluid Dynamics for the OC4-DeepCwind Semi-Submersible: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benitz, M. A.; Schmidt, D. P.; Lackner, M. A.

    Hydrodynamic loads on the platforms of floating offshore wind turbines are often predicted with computer-aided engineering tools that employ Morison's equation and/or potential-flow theory. This work compares results from one such tool, FAST, NREL's wind turbine computer-aided engineering tool, and the computational fluid dynamics package, OpenFOAM, for the OC4-DeepCwind semi-submersible analyzed in the International Energy Agency Wind Task 30 project. Load predictions from HydroDyn, the offshore hydrodynamics module of FAST, are compared with high-fidelity results from OpenFOAM. HydroDyn uses a combination of Morison's equations and potential flow to predict the hydrodynamic forces on the structure. The implications of the assumptionsmore » in HydroDyn are evaluated based on this code-to-code comparison.« less

  17. 76 FR 16407 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLVI.... Project No. 13734-000. FFP Missouri 17, LLC Project No. 13754... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\3\\ The priority established by this drawing will...

  18. 76 FR 16409 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLVII... Project No. 13743-000. FFP Missouri 16, LLC Project No. 13753... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\3\\ The priority established by this drawing will...

  19. 76 FR 16409 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XXXIV... Project No. 13742-000. FFP Missouri 5, LLC Project No. 13757-000... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\3\\ The priority established by this drawing will be used to determine...

  20. 76 FR 4893 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Drawing January 20, 2011. Lock Hydro Friends Fund XLIII Project No. 13745-000 FFP Missouri 14, LLC Project... Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the three applicants identified in this notice. The drawing is open to the public and will be held in room...

  1. Synthesis, Purification, and Characterization of a [mu]-(1,3-Propanedithiolato)-Hexacarbonyldiiron

    ERIC Educational Resources Information Center

    Works, Carmen F.

    2007-01-01

    A project which exposes students to biologically important transition-metal chemistry is illustrated by taking an example of the iron-carbonyl compound, [mu]-(1,3-Propanedithiolaro)-hexa-carbonyldiiron as a structural model for an iron-only hydro-genase. The project provides the students with experience of Schlenk line techniques, purification,…

  2. 78 FR 13870 - Roberto Sella; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI13-3-000] Roberto Sella... 7, 2012. d. Applicant: Roberto Sella. e. Name of Project: Hydro-electric and Geothermal Alternative Energy System at Paper Hill Farm (Paper Hill Farm). f. Location: The proposed Paper Hill Farm project...

  3. Zambia : long-term generation expansion study - executive summary.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conzelmann, G.; Koritarov, V.; Buehring, W.

    2008-02-28

    The objective of this study is to analyze possible long-term development options of the Zambian electric power system in the period up to 2015. The analysis involved the hydro operations studies of the Zambezi river basin and the systems planning studies for the least-cost generation expansion planning. Two well-known and widely accepted computer models were used in the analysis: PC-VALORAGUA model for the hydro operations and optimization studies and the WASP-III Plus model for the optimization of long-term system development. The WASP-III Plus model is a part of the Argonne National Laboratory's Energy and Power Evaluation Model (ENPEP). The analysismore » was conducted in close collaboration with the Zambia Electricity Supply Corporation (ZESCO). On the initiative from The World Bank, the sponsor of the study, ZESCO formed a team of experts that participated in the analysis and were trained in the use of computer models. Both models were transferred to ZESCO free of charge and installed on several computers in the ZESCO corporate offices in Lusaka. In September-October 1995, two members of the ZESCO National Team participated in a 4-week training course at Argonne National Laboratory near Chicago, U.S.A., focusing on the long-term system expansion planning using the WASP and VALORAGUA models. The hydropower operations studies were performed for the whole Zambezi river basin, including the full installation of the Kariba power station, and the Cahora Bassa hydro power station in Mozambique. The analysis also included possible future projects such as Itezhi-Tezhi, Kafue Gorge Lower, and Batoka Gorge power stations. As hydropower operations studies served to determine the operational characteristics of the existing and future hydro power plants, it was necessary to simulate the whole Zambezi river basin in order to take into account all interactions and mutual influences between the hydro power plants. In addition, it allowed for the optimization of reservoir management and optimization of hydro cascades, resulting in the better utilization of available hydro potential. Numerous analyses were performed for different stages of system development. These include system configurations that correspond to years 1997, 2001, 2015 and 2020. Additional simulations were performed in order to determine the operational parameters of the three existing hydro power stations Victoria Falls, Kariba, and Kafue Gorge Upper, that correspond to the situation before and after their rehabilitation. The rehabilitation works for these three major power stations, that would bring their operational parameters and availability back to the design level, are planned to be carried out in the period until 2000. The main results of the hydro operations studies are presented in Table ES-1. These results correspond to VALORAGUA simulations of system configurations in the years 2001 and 2015. The minimum, average, and maximum electricity generation is based on the simulation of monthly water inflows that correspond to the chronological series of unregulated water inflows at each hydro profile in the period from April 1961 to March 1990. The recommended hydrology dataset provided in the Hydrology Report of the SADC Energy Project AAA 3.8 was used for this study.« less

  4. The different modes of hydro-economic analysis (Invited)

    NASA Astrophysics Data System (ADS)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be converted into hydro-economic models.

  5. Use of a scenario-neutral approach to identify the key hydro-meteorological attributes that impact runoff from a natural catchment

    NASA Astrophysics Data System (ADS)

    Guo, Danlu; Westra, Seth; Maier, Holger R.

    2017-11-01

    Scenario-neutral approaches are being used increasingly for assessing the potential impact of climate change on water resource systems, as these approaches allow the performance of these systems to be evaluated independently of climate change projections. However, practical implementations of these approaches are still scarce, with a key limitation being the difficulty of generating a range of plausible future time series of hydro-meteorological data. In this study we apply a recently developed inverse stochastic generation approach to support the scenario-neutral analysis, and thus identify the key hydro-meteorological variables to which the system is most sensitive. The stochastic generator simulates synthetic hydro-meteorological time series that represent plausible future changes in (1) the average, extremes and seasonal patterns of rainfall; and (2) the average values of temperature (Ta), relative humidity (RH) and wind speed (uz) as variables that drive PET. These hydro-meteorological time series are then fed through a conceptual rainfall-runoff model to simulate the potential changes in runoff as a function of changes in the hydro-meteorological variables, and runoff sensitivity is assessed with both correlation and Sobol' sensitivity analyses. The method was applied to a case study catchment in South Australia, and the results showed that the most important hydro-meteorological attributes for runoff were winter rainfall followed by the annual average rainfall, while the PET-related meteorological variables had comparatively little impact. The high importance of winter rainfall can be related to the winter-dominated nature of both the rainfall and runoff regimes in this catchment. The approach illustrated in this study can greatly enhance our understanding of the key hydro-meteorological attributes and processes that are likely to drive catchment runoff under a changing climate, thus enabling the design of tailored climate impact assessments to specific water resource systems.

  6. Effect of aqueous and hydro-alcoholic extracts of lettuce (Lactuca sativa) seed on testosterone level and spermatogenesis in NMRI mice.

    PubMed

    Ahangarpour, Akram; Oroojan, Ali Akbar; Radan, Maryam

    2014-01-01

    One of the considerable uses of lettuce (Lactuca sativa) seed in traditional medicine has been to reduce semen, sperm and sexuality. The aim of this study was to investigate the effects of aqueous and hydro-alcoholic extracts of lettuce seed on testosterone level and spermatogenesis. In this experimental study 24 adult male NMRI mice weighing 20-25gr were purchased. Animals were randomly divided into 4 groups: controls, hydro-alcoholic (200 mg/kg) and aqueous extracts (50, 100mg/kg). The extracts were injected intraperitoneally once a day for 10 consecutive days. 2 weeks after the last injection, the mice were anaesthetized by ether and after laparatomy blood was collected from the heart to determine testosterone by ELISA assay kit. Then testis and cauda epididymis of all animals were removed for analyzing testis morphology and sperm count and viability. Testis weight in hydro-alcoholic and aqueous extracts 100 mg/kg (p=0.001) and aqueous extract 50 mg/kg (p=0.008) groups was increased. Sperm viability in hydro-alcoholic (p=0.001) and aqueous extracts 50 (p=0.026), 100 mg/kg (p=0.045) groups was decreased, Also the results showed a significant decrease in sperm count in hydro-alcoholic (p=0.035) and aqueous extracts 50 mg/kg (p=0.006) groups in comparison with control group. Also there was a significant increase in serum level of testosterone in aqueous extract 50 mg/kg group in comparison with control (p=0.002) hydro-alcoholic (p=0.001) and aqueous extracts 100 mg/kg (p=0.003) groups. Present results demonstrated that hydro-alcoholic and aqueous 50 mg/kg extracts of lettuce seed have antispermatogenic effects, also aqueous extract 50 mg/kg increased serum level of testosterone in mice. Therefore we can suggest that lettuce seed could be a potential contraceptive agent. This article extracted from M.Sc. student research project. (Ali Akbar Oroojan).

  7. Data and Models as Social Objects in the HydroShare System for Collaboration in the Hydrology Community and Beyond

    NASA Astrophysics Data System (ADS)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Band, L. E.; Merwade, V.; Couch, A.; Hooper, R. P.; Maidment, D. R.; Dash, P. K.; Stealey, M.; Yi, H.; Gan, T.; Castronova, A. M.; Miles, B.; Li, Z.; Morsy, M. M.; Crawley, S.; Ramirez, M.; Sadler, J.; Xue, Z.; Bandaragoda, C.

    2016-12-01

    How do you share and publish hydrologic data and models for a large collaborative project? HydroShare is a new, web-based system for sharing hydrologic data and models with specific functionality aimed at making collaboration easier. HydroShare has been developed with U.S. National Science Foundation support under the auspices of the Consortium of Universities for the Advancement of Hydrologic Science, Inc. (CUAHSI) to support the collaboration and community cyberinfrastructure needs of the hydrology research community. Within HydroShare, we have developed new functionality for creating datasets, describing them with metadata, and sharing them with collaborators. We cast hydrologic datasets and models as "social objects" that can be shared, collaborated around, annotated, published and discovered. In addition to data and model sharing, HydroShare supports web application programs (apps) that can act on data stored in HydroShare, just as software programs on your PC act on your data locally. This can free you from some of the limitations of local computing capacity and challenges in installing and maintaining software on your own PC. HydroShare's web-based cyberinfrastructure can take work off your desk or laptop computer and onto infrastructure or "cloud" based data and processing servers. This presentation will describe HydroShare's collaboration functionality that enables both public and private sharing with individual users and collaborative user groups, and makes it easier for collaborators to iterate on shared datasets and models, creating multiple versions along the way, and publishing them with a permanent landing page, metadata description, and citable Digital Object Identifier (DOI) when the work is complete. This presentation will also describe the web app architecture that supports interoperability with third party servers functioning as application engines for analysis and processing of big hydrologic datasets. While developed to support the cyberinfrastructure needs of the hydrology community, the informatics infrastructure for programmatic interoperability of web resources has a generality beyond the solution of hydrology problems that will be discussed.

  8. a Novel Method for Automation of 3d Hydro Break Line Generation from LIDAR Data Using Matlab

    NASA Astrophysics Data System (ADS)

    Toscano, G. J.; Gopalam, U.; Devarajan, V.

    2013-08-01

    Water body detection is necessary to generate hydro break lines, which are in turn useful in creating deliverables such as TINs, contours, DEMs from LiDAR data. Hydro flattening follows the detection and delineation of water bodies (lakes, rivers, ponds, reservoirs, streams etc.) with hydro break lines. Manual hydro break line generation is time consuming and expensive. Accuracy and processing time depend on the number of vertices marked for delineation of break lines. Automation with minimal human intervention is desired for this operation. This paper proposes using a novel histogram analysis of LiDAR elevation data and LiDAR intensity data to automatically detect water bodies. Detection of water bodies using elevation information was verified by checking against LiDAR intensity data since the spectral reflectance of water bodies is very small compared with that of land and vegetation in near infra-red wavelength range. Detection of water bodies using LiDAR intensity data was also verified by checking against LiDAR elevation data. False detections were removed using morphological operations and 3D break lines were generated. Finally, a comparison of automatically generated break lines with their semi-automated/manual counterparts was performed to assess the accuracy of the proposed method and the results were discussed.

  9. CUAHSI-HIS: an Internet based system to facilitate public discovery, access, and exploration of different water science data sources

    NASA Astrophysics Data System (ADS)

    Arrigo, J. S.; Hooper, R. P.; Choi, Y.; Ames, D. P.; Kadlec, J.; Whiteaker, T.

    2011-12-01

    "Water is everywhere." This sentiment underscores the importance of instilling hydrologic and earth science literacy in educators, students, and the general public, but also presents challenges for water scientists and educators. Scientific data about water is collected and distributed by several different sources, from federal agencies to scientific investigators to citizen scientists. As competition for limited water resources increase, increasing access to and understanding of the wealth of information about the nation's and the world's water will be critical. The CUAHSI-HIS system is a web based system for sharing hydrologic data that can help address this need. HydroDesktop is a free, open source application for finding, getting, analyzing and using hydrologic data from the CUAHSI-HIS system. It works with HydroCatalog which indexes the data to find out what data exists and where it is, and then it retrieves the data from HydroServers where it is stored communicating using WaterOneFlow web services. Currently, there are over 65 services registered in HydroCatalog providing central discovery of water data from several federal and state agencies, university projects, and other sources. HydroDesktop provides a simplified GIS that allows users to incorporate spatial data, and simple analysis tools to facilitate graphing and visualization. HydroDesktop is designed to be useful for a number of different groups of users with a wide variety of needs and skill levels including university faculty, graduate and undergraduate students, K-12 students, engineering and scientific consultants, and others. This presentation will highlight some of the features of HydroDesktop and the CUAHSI-HIS system that make it particularly appropriate for use in educational and public outreach settings, and will present examples of educational use. The incorporation of "real data," localization to an area of interest, and problem-based learning are all recognized as effective strategies for learning. Many example exercises educators create around water may list several websites and data sources (e.g. EPA, USGS, etc.) an educator needs to prepare even a simple exercise. HydroDesktop can simplify this process by providing unified access to several sources. The GIS interface can be used to incorporate local spatial data to allow students to explore environmental factors, and to illustrate concepts, such as watershed delineation. Simple graphing and time series tools can be used to illustrate relationships between different types of data and important water science concepts. CUAHSI is interested in partnering with science PIs to facilitate access to their project data and creating education and outreach materials around them, as well as with educators, public policy professionals and other constituencies to explore how CUAHSI HIS services can be utilized to foster public understanding and consumption of water information.

  10. Nanostructures in n-Octanol Equilibrated with Additives and/or Water.

    PubMed

    Cevc, Gregor; Berts, Ida; Fischer, Stefan F; Rädler, Joachim O; Nickel, Bert

    2018-05-29

    Fluid fatty alcohols are believed to be nanostructured but broadly amorphous (i.e., noncrystalline) fluids and solvents, including the most popular fatty tissue mimetic, hydrated n-octanol (i.e., hydro-octanol). To check this premise, we studied dry octanol and hydro-octanol as a model of relatively short fluid n-alkanols with small-angle X-ray scattering (SAXS). We also combined this alkanol with the matching alkane (i.e., octane) and with a common anti-inflammatory pain killer (ketoprofen). This revealed that (hydro-)octanol and arguably any other short fatty alcohol form a mesophase. Its basic structural motif are regularly packed polar nanoclusters, reflected in the inner peak in the SAXS diffractogram of (hydro-)octanol and other fluid n-alkanols. The nanoclusters arguably resemble tiny, (inverse) hydrated bilayer fragments, located on a thermally smeared para-crystalline lattice. Additives to hydro-octanol can change the nanoclusters only moderately, if at all. For example, octane and the drug ketoprofen added to hydro-octanol enlarge the nanoclusters only little because of the mixture's packing frustration. To associate with and to bring more water into hydro-octanol, an additive must hence transform the nanoclusters: it expands them into irregularly distributed aqueous lacunae that form a proto-microemulsion, reflected in the previously unknown Guinier's SAXS signal. A "weak" (i.e., a weakly polar or nonpolar) additive can moreover create only size-limited lacunae. Coexistence of nanoclusters and lacunae as well as size variability of the latter in hydro-octanol subvert the concept of octanol-water partition coefficient, which relies on the studied compartment homogeneity. In turn, it opens new possibilities for interfacial catalysis. Reinterpreting "octanol-water partition coefficient" data in terms of octanol-water association or binding constant(s) could furthermore diminish the variability of molecular lipophilicity description and pave the ground toward a more precise theoretical quantification and prediction of molecular properties.

  11. Local community perception and awareness of flash floods vulnerability at a small catchment scale in the Bend Subcarpathians, Romania

    NASA Astrophysics Data System (ADS)

    Micu, Dana; Balteanu, Dan; Sima, Mihaela; Dumitrascu, Monica; Chendes, Viorel; Grigorescu, Ines; Dragota, Carmen; Dogaru, Diana; Costache, Andra

    2015-04-01

    The study aims to identify local communities perception and awareness in terms of hydro-meteorological extreme events in order to better understand the local context of vulnerability and communities resilience to flash floods as well as the mitigation measures undertaken by local authorities to cope with these phenomena. The study-area is located in the Bend Subcarpathians, Romania, a region well known for high tectonic mobility and dynamics of hydro-geomorphic processes (e.g. floods and flash floods, landslides). The study was conducted in the framework of VULMIN project (PN-II-PT-PCCA-2011-3.1-1587), funded by the Ministry of National Education for the period 2012-2016 (http://www.igar-vulmin.ro). The previous analyses conducted in the project showed a high exposure to flash floods of small river catchments (generally below 200 km2 ) located in the study-area (Teleajen-Buzau hydrographic area). Some of the most recent events (2005, 2008, 2010 and 2014) had a high impact on local communities in terms of important losses to their assets and psychological effects. Thus, in the summer 2014, a questionnaire-based survey was addressed to over 50 households (from 5 villages), significantly affected by flash floods and structured interviews were held with local authorities (local municipalities, county Civil Protection Inspectorates). The questionnaire was focused on the perception of human vulnerability to environmental change and extreme events, mainly floods, aiming to outline the personal experience, post-disaster rehabilitation, awareness, worrying and opinion on the measures aimed to prevent and mitigate the effects of flooding. The flash flood events are of major concern for local community, due to their high return period (1-5 years) and magnitude in the recent years. This influences also the population response and adaptive capacity to these events, which is limited to individual measures (e.g. buildings consolidations and relocations). The survey showed a discrepancy between the people's perception on the local authorities reaction during and post-event and the local authorities' perception on their response and preparedness measures. It was noticed a high interest of local authorities to access scientific data (flash flood hazard and risk maps, climate change projections) to support the development of adequate mitigation measures. However, the lack of funds is still limiting their implementation as well as the development of a long-term strategy.

  12. Combined Modular Pumped Hydro Energy Storage Plus Solar PV Proposal for Rio Rancho High School, New Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bibeault, Mark Leonide

    This is a proposal to locate a combined Modular Pumped Hydro (MPH) Energy Storage plus PV solar facility at Rio Rancho High School, NM. The facility will functionally provide electricity at night derived from renewable solar energy. Additionally the facility will provide STEM related educational opportunities for students and staff of the school, public community outreach, and validation of an energy storage approach applicable for the Nation (up to 1,000,000 kWh per installation). The proposal will summarize the nature of electricity, why energy storage is useful, present the combined MPH and solar PV production design, present how the actual designmore » will be built and operated in a sustainable manner, how the project could be funded, and how the project could be used in STEM related activities.« less

  13. Body composition of collegiate football players: bioelectrical impedance and skinfolds compared to hydrostatic weighing.

    PubMed

    Oppliger, R A; Nielsen, D H; Shetler, A C; Crowley, E T; Albright, J P

    1992-01-01

    The need for simple, valid techniques of body composition assessment among athletes is a growing concern of the physical therapist. This paper reports on several common methods applied to university football players. Body composition analysis was conducted on 28 Division IA football players using three different bioelectrical impedance analysis (BIA) systems, skinfolds (SF), and hydrostatic weighing (HYDRO). Correlations for all methods with HYDRO were high (>.88), but BIA significantly overpredicted body fatness. In contrast, three SF equations showed small differences with HYDRO and reasonable measurement error. Clinicians should exercise caution when using BIA based on the existing manufacturers' equations with athletic populations. Adjustments to BIA regression equations by including modifying or anthropometric variables could enhance the predictive accuracy of these methods with lean, athletic males. J Orthop Sports Phys Ther 1992;15(4):187-192.

  14. Establishing a Dynamic Database of Blue and Fin Whale Locations from Recordings at the IMS CTBTO hydro-acoustic network. The Baleakanta Project

    NASA Astrophysics Data System (ADS)

    Le Bras, R. J.; Kuzma, H.

    2013-12-01

    Falling as they do into the frequency range of continuously recording hydrophones (15-100Hz), blue and fin whale songs are a significant source of noise on the hydro-acoustic monitoring array of the International Monitoring System (IMS) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO). One researcher's noise, however, can be a very interesting signal in another field of study. The aim of the Baleakanta Project (www.baleakanta.org) is to flag and catalogue these songs, using the azimuth and slowness of the signal measured at multiple hydrophones to solve for the approximate location of singing whales. Applying techniques borrowed from human speaker identification, it may even be possible to recognize the songs of particular individuals. The result will be a dynamic database of whale locations and songs with known individuals noted. This database will be of great value to marine biologists studying cetaceans, as there is no existing dataset which spans the globe over many years (more than 15 years of data have been collected by the IMS). Current whale song datasets from other sources are limited to detections made on small, temporary listening devices. The IMS song catalogue will make it possible to study at least some aspects of the global migration patterns of whales, changes in their songs over time, and the habits of individuals. It is believed that about 10 blue whale 'cultures' exist with distinct vocal patterns; the IMS song catalogue will test that number. Results and a subset of the database (delayed in time to mitigate worries over whaling and harassment of the animals) will be released over the web. A traveling museum exhibit is planned which will not only educate the public about whale songs, but will also make the CTBTO and its achievements more widely known. As a testament to the public's enduring fascination with whales, initial funding for this project has been crowd-sourced through an internet campaign.

  15. Run-of-river power plants in Alpine regions: whither optimal capacity?

    NASA Astrophysics Data System (ADS)

    Lazzaro, Gianluca; Botter, Gianluca

    2015-04-01

    Hydropower is the major renewable electricity generation technology worldwide. The future expansion of this technology mostly relies on the development of small run-of-river projects, in which a fraction of the running flows is diverted from the river to a turbine for energy production. Even though small hydro inflicts a smaller impact on aquatic ecosystems and local communities compared to large dams, it cannot prevent stresses on plant, animal, and human well-being. This is especially true in mountain regions where the plant outflow is located several kilometers downstream of the intake, thereby inducing the depletion of river reaches of considerable length. Moreover, the negative cumulative effects of run-of-river systems operating along the same river threaten the ability of stream networks to supply ecological corridors for plants, invertebrates or fishes, and support biodiversity. Research in this area is severely lacking. Therefore, the prediction of the long-term impacts associated to the expansion of run-of-river projects induced by global-scale incentive policies remains highly uncertain. This contribution aims at providing objective tools to address the preliminary choice of the capacity of a run-of-river hydropower plant when the economic value of the plant and the alteration of the flow regime are simultaneously accounted for. This is done using the concepts of Pareto-optimality and Pareto-dominance, which are powerful tools suited to face multi-objective optimization in presence of conflicting goals, such as the maximization of the profitability and the minimization of the hydrologic disturbance induced by the plant in the river reach between the intake and the outflow. The application to a set of case studies belonging to the Piave River basin (Italy) suggests that optimal solutions are strongly dependent the natural flow regime at the plant intake. While in some cases (namely, reduced streamflow variability) the optimal trade-off between economic profitability and hydrologic disturbance is well identified, in other cases (enhanced streamflow variability) multiple options and/or ranges of optimal capacities may be devised. Such alternatives offer to water managers an objective basis to identify optimal allocation of resources and policy actions. Small hydro technology is likely to gain a higher social value in the next decades if the environmental and hydrologic footprint associated to the energetic exploitation of surface water will take a higher priority in civil infrastructures planning.

  16. 76 FR 43679 - FirstLight Hydro Generating Company; City of Norwich Department of Public Utilities; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-012; Project No. 12968..., Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission's Rules... gravity-type ungated spillway section with a crest elevation of 75.38 feet local datum and 30-inch wooden...

  17. Water turbine technology for small power stations

    NASA Astrophysics Data System (ADS)

    Salovaara, T.

    1980-02-01

    The paper examines hydro-power stations and the efficiency and costs of using water turbines to run them. Attention is given to different turbine types emphasizing the use of Kaplan-turbines and runners. Hydraulic characteristics and mechanical properties of low head turbines and small turbines, constructed of fully fabricated steel plate structures, are presented.

  18. Integrated hydro-environmental impact assessment and alternative selection of low impact development practices in small urban catchments.

    PubMed

    Yang, Yang; Chui, Ting Fong May

    2018-06-20

    Attention is increasingly being paid to low impact development (LID) practices in urban stormwater management. Because LID practices offer a wide variety of hydro-environmental benefits, it is often necessary to account for these benefits collectively in cost-benefit analysis and LID alternative selection. The conventional methods of quantifying these benefits, however, can hardly incorporate the preferences of decision makers, and commonly involve tedious parameter estimations. To address these shortcomings, this study adopts a relative performance evaluation method to assess the various hydro-environmental impacts of LID alternatives in small urban catchments. This study considers several categories of hydro-environmental impacts, including water balance impact, surface pollutant load abatement, and combined sewer overflow and flood risk mitigation. Several performance indicators are used for each impact category. The system-wide effectiveness of an LID alternative is then derived by the weighted aggregation of its indicator scores, which are obtained by comparing its performance with that of all of the other alternatives. The hydro-environmental impact of green roofs and bioretention cells of varying areas in New York City, U.S. are investigated in detail. The results suggest that a green roof that covers the whole catchment is as effective as a bioretention cell that covers 3%-5% of the catchment in terms of stormwater management, and that the effectiveness of a bioretention cell doubles when its surface area increases from 2% to 10% of the catchment area. These assessment results are influenced by catchment-specific assessment criteria (e.g., the high flow threshold) and management interests, which suggests that design guidelines for different catchments should be tailored to their natural and drainage characteristics. The framework used in this study allows stakeholders' interests to be reflected in LID alternative selections and the implications of different design guidelines to be thoroughly investigated. Copyright © 2018 Elsevier Ltd. All rights reserved.

  19. 78 FR 7752 - Trade Mission to Egypt and Kuwait

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ..., steam turbines, hydro and wind turbines, blades, and other equipment, as well as development and project... capital of Egypt and the largest city in Africa. The business week runs from Sunday through Thursday...

  20. Modeling Reservoir-River Networks in Support of Optimizing Seasonal-Scale Reservoir Operations

    NASA Astrophysics Data System (ADS)

    Villa, D. L.; Lowry, T. S.; Bier, A.; Barco, J.; Sun, A.

    2011-12-01

    HydroSCOPE (Hydropower Seasonal Concurrent Optimization of Power and the Environment) is a seasonal time-scale tool for scenario analysis and optimization of reservoir-river networks. Developed in MATLAB, HydroSCOPE is an object-oriented model that simulates basin-scale dynamics with an objective of optimizing reservoir operations to maximize revenue from power generation, reliability in the water supply, environmental performance, and flood control. HydroSCOPE is part of a larger toolset that is being developed through a Department of Energy multi-laboratory project. This project's goal is to provide conventional hydropower decision makers with better information to execute their day-ahead and seasonal operations and planning activities by integrating water balance and operational dynamics across a wide range of spatial and temporal scales. This presentation details the modeling approach and functionality of HydroSCOPE. HydroSCOPE consists of a river-reservoir network model and an optimization routine. The river-reservoir network model simulates the heat and water balance of river-reservoir networks for time-scales up to one year. The optimization routine software, DAKOTA (Design Analysis Kit for Optimization and Terascale Applications - dakota.sandia.gov), is seamlessly linked to the network model and is used to optimize daily volumetric releases from the reservoirs to best meet a set of user-defined constraints, such as maximizing revenue while minimizing environmental violations. The network model uses 1-D approximations for both the reservoirs and river reaches and is able to account for surface and sediment heat exchange as well as ice dynamics for both models. The reservoir model also accounts for inflow, density, and withdrawal zone mixing, and diffusive heat exchange. Routing for the river reaches is accomplished using a modified Muskingum-Cunge approach that automatically calculates the internal timestep and sub-reach lengths to match the conditions of each timestep and minimize computational overhead. Power generation for each reservoir is estimated using a 2-dimensional regression that accounts for both the available head and turbine efficiency. The object-oriented architecture makes run configuration easy to update. The dynamic model inputs include inflow and meteorological forecasts while static inputs include bathymetry data, reservoir and power generation characteristics, and topological descriptors. Ensemble forecasts of hydrological and meteorological conditions are supplied in real-time by Pacific Northwest National Laboratory and are used as a proxy for uncertainty, which is carried through the simulation and optimization process to produce output that describes the probability that different operational scenario's will be optimal. The full toolset, which includes HydroSCOPE, is currently being tested on the Feather River system in Northern California and the Upper Colorado Storage Project.

  1. 4 Metre diameter penstock construction for the Raymond Reservoir Hydro Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, H.D.; Alexander, M.

    1995-12-31

    A four metre diameter 770 m long buried steel penstock was constructed for the 20 MW Raymond Reservoir Hydro Project in southern Alberta. The penstock delivers up to 56.7 m{sup 3}/sec of irrigation water at an effective head of 44 m to a 2.6 m diameter Kaplan turbine. The hydro facility was commissioned in the spring of 1994. The steel pipe was delivered to the site in 18 m long sections from a fabrication plant located 250 km away. Specialized equipment was engineered and constructed to externally coat and internally line the pipe sections on site. The pipe sections, weighingmore » from 27,000 to 30,000 kg, were rolled and moved on a specially built lathe during the external sandblasting and tape wrapping operation. The external tape wrapping is one element of the cathodic protection system for the steel pipe. Specialized equipment was modified to sandblast the interior to white metal and then mechanically apply three coats of internal epoxy lining. The internal lining improves the hydraulic characteristics of the pipe in addition to protecting the pipe from corrosion. This innovative approach to coating and lining the pipe resulted in an exceptionally high quality product at an affordable cost.« less

  2. Public opinion and communicative action around renewable energy projects

    NASA Astrophysics Data System (ADS)

    Fast, Stewart

    This thesis investigates how rural communities negotiate the development of renewable energy projects. Public and local community acceptance of these new technologies in rural areas around the world is uncertain and spatially uneven and represents an area of emerging public policy interest and one where scholarly theory is rapidly developing. This thesis uses Habermasian concepts of public sphere, communicative action and deliberative democracy, as well as the concept of "wicked problems" from the planning studies literature combined with geographical concepts of place and scale to advance theoretical and empirical understanding of how public opinion on renewable energy technologies is formed in place. It documents energy use patterns, attitudes and socio-political relations at a time when considerable state and business efforts are directed at the construction of solar, wind, biomass and small-hydro technologies in rural regions. These concepts and theories are applied in a case study of rural communities in the Eastern Ontario Highlands, an impoverished area undergoing rapid restructuring driven by centralization of services and amenity migration but with abundant natural resources in form of forests, numerous waterways and open space which have attracted a broad range of new energy developments. Overall high levels of support for alternative energy development particularly for solar power were found, albeit for reasons of local energy security and not for reasons of preventing climate change. There was some evidence that seasonal residents are less supportive of hydro and biomass projects than permanent residents possibly reflecting broader trends in rural economies away from productive uses of land to consumptive appreciation of rural landscapes. The thesis suggests that collective action to advance energy projects in the case study area require agreement along three world-claims (truth, rightness and truthfulness) and that communication leading to discourse which uncovers hitherto hidden reasons for action is possible. These findings offer rare empirical evidence of the predictions of deliberative democratic theory in environmental planning settings. However, multiple barriers to communicative action were also identified and there is evidence that the state's reliance on market incentives may have long term costs in terms of diminished public reasoning around renewable energy.

  3. Cross sectoral impacts on water availability at +2 °C and +3 °C for east Mediterranean island states: The case of Crete

    NASA Astrophysics Data System (ADS)

    Koutroulis, A. G.; Grillakis, M. G.; Daliakopoulos, I. N.; Tsanis, I. K.; Jacob, D.

    2016-01-01

    Ensemble pan-European projections under a 2 °C global warming relative to the preindustrial period reveal a more intense warming in south Eastern Europe by up to +3 °C, thus indicating that impacts of climate change will be disproportionately high for certain regions. The Mediterranean is projected as one of the most vulnerable areas to climatic and anthropogenic changes with decreasing rainfall trends and a continuous gradual warming causing a progressive decline of average stream flow. Many Mediterranean regions are currently experiencing high to severe water stress induced by human and climate drivers. Changes in average climate conditions will increase this stress notably because of a 10-30% decline in freshwater resources. For small island states, where accessibility to freshwater resources is limited the impact will be more pronounced. Here we use a generalized cross-sectoral framework to assess the impact of climatic and socioeconomic futures on the water resources of an Eastern Mediterranean island. A set of representative regional climate models simulations from the EURO-CORDEX initiative driven by different RCP2.6, RCP4.5, and RCP8.5 GCMs are used to form a comparable set of results and a useful basis for the assessment of uncertainties related to impacts of 2° warming and above. A generalized framework of a cross-sectoral water resources analysis was developed in collaboration with the local water authority exploring and costing adaptation measures associated with a set of socioeconomic pathways (SSPs). Transient hydrological modeling was performed to describe the projected hydro-climatological regime and water availability for each warming level. The robust signal of less precipitation and higher temperatures that is projected by climate simulations results to a severe decrease of local water resources which can be mitigated by a number of actions. Awareness of the practical implications of plausible hydro-climatic and socio-economic scenarios in the not so distant future may be the key to shift perception and preference towards a more sustainable direction.

  4. Evaluating Effects of Stressors from Marine and Hydrokinetic Energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Copping, Andrea E.; Blake, Kara M.; Hanna, Luke A.

    2012-09-30

    Potential environmental effects of marine and hydrokinetic (MHK) energy development are not well understood, yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term consequences. An understanding of risks associated with interactions between MHK installations and aquatic receptors, including animals, habitats, and ecosystems, can help define key uncertainties and focus regulatory actions and scientific studies on interactions of most concern. During FY 2012, Pacific Northwest National Laboratory (PNNL) continued to follow project developments on the two marine and hydrokinetic projects reviewed for Environmental Risk Evaluation System (ERES) screening analysis in FYmore » 2011: a tidal project in the Gulf of Maine using Ocean Renewable Power Company TidGenTM turbines and a wave project planned for the coast of Oregon using Aquamarine Oyster surge devices. The ERES project in FY 2012 also examined two stressor–receptor interactions previously identified through the screening process as being of high importance: 1) the toxicity effects of antifouling coatings on MHK devices on aquatic resources and 2) the risk of a physical strike encounter between an adult killer whale and an OpenHydro turbine blade. The screening-level assessment of antifouling paints and coatings was conducted for two case studies: the Snohomish County Public Utility District No. 1 (SnoPUD) tidal turbine energy project in Admiralty Inlet, Puget Sound, Washington, and the Ocean Power Technologies (OPT) wave buoy project in Reedsport, Oregon. Results suggest minimal risk to aquatic biota from antifouling coatings used on MHK devices deployed in large estuaries or open ocean environments. For the strike assessment of a Southern Resident Killer Whale (SRKW) encountering an OpenHydro tidal turbine blade, PNNL teamed with colleagues from Sandia National Laboratories (SNL) to carry out an analysis of the mechanics and biological consequences of different blade strike scenarios. Results of these analyses found the following: 1) a SRKW is not likely to experience significant tissue injury from impact by an OpenHydro turbine blade; and 2) if whale skin behaves similarly to the materials considered as surrogates for the upper dermal layers of whale skin, it would not be torn by an OpenHydro blade strike. The PNNL/SNL analyses could not provide insight into the potential for more subtle changes to SRKWs from an encounter with a turbine, such as changes in behavior, or inform turbine interactions for other whales or other turbines. These analyses were limited by the available time frame in which results were needed and focused on the mechanical response of whale tissues and bone to blade strike. PNNL proposes that analyses of additional turbine designs and interactions with other marine mammals that differ in size, body conformation, and mass be performed.« less

  5. Building an ensemble of climate scenarios for decision-making in hydrology: benefits, pitfalls and uncertainties

    NASA Astrophysics Data System (ADS)

    Braun, Marco; Chaumont, Diane

    2013-04-01

    Using climate model output to explore climate change impacts on hydrology requires several considerations, choices and methods in the post treatment of the datasets. In the effort of producing a comprehensive data base of climate change scenarios for over 300 watersheds in the Canadian province of Québec, a selection of state of the art procedures were applied to an ensemble comprising 87 climate simulations. The climate data ensemble is based on global climate simulations from the Coupled Model Intercomparison Project - Phase 3 (CMIP3) and regional climate simulations from the North American Regional Climate Change Assessment Program (NARCCAP) and operational simulations produced at Ouranos. Information on the response of hydrological systems to changing climate conditions can be derived by linking climate simulations with hydrological models. However, the direct use of raw climate model output variables as drivers for hydrological models is limited by issues such as spatial resolution and the calibration of hydro models with observations. Methods for downscaling and bias correcting the data are required to achieve seamless integration of climate simulations with hydro models. The effects on the results of four different approaches to data post processing were explored and compared. We present the lessons learned from building the largest data base yet for multiple stakeholders in the hydro power and water management sector in Québec putting an emphasis on the benefits and pitfalls in choosing simulations, extracting the data, performing bias corrections and documenting the results. A discussion of the sources and significance of uncertainties in the data will also be included. The climatological data base was subsequently used by the state owned hydro power company Hydro-Québec and the Centre d'expertise hydrique du Québec (CEHQ), the provincial water authority, to simulate future stream flows and analyse the impacts on hydrological indicators. While this submission focuses on the production of climatic scenarios for application in hydrology, the submission « The (cQ)2 project: assessing watershed scale hydrological changes for the province of Québec at the 2050 horizon, a collaborative framework » by Catherine Guay describes how Hydro-Québec and CEHQ put the data into use.

  6. Climate conditions of the “El Niño” phenomenon for a hydro-eolic complementarity project in peru

    NASA Astrophysics Data System (ADS)

    Castillo N, Leonardo; Ortega M, Arturo; Luyo, Jaime E.

    2018-05-01

    Northern Peru is threatened by the consequences of a natural phenomenon called “El Niño”, mainly during the months of December to April. In the summer of 2017, this event reported strong climatic variations with intense rains, increasing the water levels of the Chira and Piura rivers, filling the Poechos reservoir, together with flooding and mudding. However, from an energetic perspective, these climatic alterations have a strong potential to increase the availability of the wind and hydro renewable energies in northern Peru. This work performs an evaluation of the hydro-eolic complementarity as part of the sustainability of energy systems. The study includes evaluation of historical records of wind velocity and water flow rates. It then evaluates correlation, analysis, and estimates the hydro and wind energy potentials generated by this phenomenon. The implications of the "El Niño" phenomenon are mostly negative. Nonetheless, it is possible to take advantage of higher wind and water flow rates with a hybrid energy system. The results obtained show a high degree of complementarity both normal and "El Niño" phenomenon condition in northern Peru.

  7. 77 FR 38051 - Jones Canyon Hydro, LLC; Notice of Application for Amendment of Preliminary Permit Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... proposed reservoirs from 6,225 feet to 7,330 feet; and (7) change the name of the project from ``Jones Canyon Pumped Storage Project'' to ``Oregon Winds Pumped Storage''. FERC Contact: Jennifer Harper, 202..., using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name...

  8. 75 FR 55317 - FirstLight Hydro Generating Company; City of Norwich Department of Public Utilities; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-002; Project No. 12968... with a crest elevation of 75.38 feet local datum; (d) an 18.83-foot-long gravity-type ungated spillway...-generator; (2) a 134-acre reservoir at an elevation of 77.9 feet local datum with a usable storage capacity...

  9. Modeling the Colorado Front Range Flood of 2013 with Coupled WRF and WRF-Hydro System

    NASA Astrophysics Data System (ADS)

    Unal, E.; Ramirez, J. A.

    2015-12-01

    Abstract. Flash floods are one of the most damaging natural disasters producing large socio-economic losses. Projected impacts of climate change include increases in the magnitude and the frequency of flash floods all around the world. Therefore, it is important to understand the physical processes of flash flooding to enhance our capacity for prediction, prevention, risk management, and recovery. However, understanding these processes is ambitious because of small spatial scale and sudden nature of flash floods, interactions with complex topography and land use, difficulty in defining initial soil moisture conditions, non-linearity of catchment response, and high space-time variability of storm characteristics. Thus, detailed regional case studies are needed, especially with respect to the interactions between the land surface and the atmosphere. One such flash flood event occurred recently in the Front Range of the Rocky Mountains of Colorado during September 9-15, 2013 causing 10 fatalities and $3B cost in damages. An unexpected persistent and moist weather pattern located over the mountains and produced seven-day extreme rainfall fed by moisture input from the Gulf of Mexico. We used a coupled WRF-WRF-Hydro modeling system to simulate this event for better understanding of the physical process and of the sensitivity of the hydrologic response to storm characteristics, initial soil moisture conditions, and watershed characteristics.

  10. HydroApps: An R package for statistical simulation to use in regional analysis

    NASA Astrophysics Data System (ADS)

    Ganora, D.

    2013-12-01

    The HydroApps package is a newborn R extension initially developed to support the use of a recent model for flood frequency estimation developed for applications in Northwestern Italy; it also contains some general tools for regional analyses and can be easily extended to include other statistical models. The package is currently at an experimental level of development. The HydroApps is a corollary of the SSEM project for regional flood frequency analysis, although it was developed independently to support various instances of regional analyses. Its aim is to provide a basis for interplay between statistical simulation and practical operational use. In particular, the main module of the package deals with the building of the confidence bands of flood frequency curves expressed by means of their L-moments. Other functions include pre-processing and visualization of hydrologic time series, analysis of the optimal design-flood under uncertainty, but also tools useful in water resources management for the estimation of flow duration curves and their sensitivity to water withdrawals. Particular attention is devoted to the code granularity, i.e. the level of detail and aggregation of the code: a greater detail means more low-level functions, which entails more flexibility but reduces the ease of use for practical use. A balance between detail and simplicity is necessary and can be resolved with appropriate wrapping functions and specific help pages for each working block. From a more general viewpoint, the package has not really and user-friendly interface, but runs on multiple operating systems and it's easy to update, as many other open-source projects., The HydroApps functions and their features are reported in order to share ideas and materials to improve the ';technological' and information transfer between scientist communities and final users like policy makers.

  11. Climate variability, snow, and physiographic controls on storm hydro graphs in small forested basins, western Cascades, Oregon

    Treesearch

    Reed M. Perkins; Julia A. Jones

    2008-01-01

    Large floods are often attributed to the melting of snow during a rain event. This study tested how climate variability, snowpack presence, and basin physiography were related to storm hydrograph shape in three small (2) basins with old-growth forest in western Oregon. Relationships between hydrograph characteristics and precipitation...

  12. Effect of aqueous and hydro-alcoholic extracts of lettuce (Lactuca sativa) seed on testosterone level and spermatogenesis in NMRI mice

    PubMed Central

    Ahangarpour, Akram; Oroojan, Ali Akbar; Radan, Maryam

    2014-01-01

    Background: One of the considerable uses of lettuce (Lactuca sativa) seed in traditional medicine has been to reduce semen, sperm and sexuality. Objective: The aim of this study was to investigate the effects of aqueous and hydro-alcoholic extracts of lettuce seed on testosterone level and spermatogenesis. Materials and Methods: In this experimental study 24 adult male NMRI mice weighing 20-25gr were purchased. Animals were randomly divided into 4 groups: controls, hydro-alcoholic (200 mg/kg) and aqueous extracts (50, 100mg/kg). The extracts were injected intraperitoneally once a day for 10 consecutive days. 2 weeks after the last injection, the mice were anaesthetized by ether and after laparatomy blood was collected from the heart to determine testosterone by ELISA assay kit. Then testis and cauda epididymis of all animals were removed for analyzing testis morphology and sperm count and viability. Results: Testis weight in hydro-alcoholic and aqueous extracts 100 mg/kg (p=0.001) and aqueous extract 50 mg/kg (p=0.008) groups was increased. Sperm viability in hydro-alcoholic (p=0.001) and aqueous extracts 50 (p=0.026), 100 mg/kg (p=0.045) groups was decreased, Also the results showed a significant decrease in sperm count in hydro-alcoholic (p=0.035) and aqueous extracts 50 mg/kg (p=0.006) groups in comparison with control group. Also there was a significant increase in serum level of testosterone in aqueous extract 50 mg/kg group in comparison with control (p=0.002) hydro-alcoholic (p=0.001) and aqueous extracts 100 mg/kg (p=0.003) groups. Conclusion: Present results demonstrated that hydro-alcoholic and aqueous 50 mg/kg extracts of lettuce seed have antispermatogenic effects, also aqueous extract 50 mg/kg increased serum level of testosterone in mice. Therefore we can suggest that lettuce seed could be a potential contraceptive agent. This article extracted from M.Sc. student research project. (Ali Akbar Oroojan) PMID:24799863

  13. 75 FR 5076 - American Hydro Power, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ...-long, 4,160-volt transmission line from the powerhouse to a transformer station, and a new... the transformer station; (10) and appurtenant facilities. The project would have an estimated annual...

  14. Particle Swarm Optimization for inverse modeling of solute transport in fractured gneiss aquifer

    NASA Astrophysics Data System (ADS)

    Abdelaziz, Ramadan; Zambrano-Bigiarini, Mauricio

    2014-08-01

    Particle Swarm Optimization (PSO) has received considerable attention as a global optimization technique from scientists of different disciplines around the world. In this article, we illustrate how to use PSO for inverse modeling of a coupled flow and transport groundwater model (MODFLOW2005-MT3DMS) in a fractured gneiss aquifer. In particular, the hydroPSO R package is used as optimization engine, because it has been specifically designed to calibrate environmental, hydrological and hydrogeological models. In addition, hydroPSO implements the latest Standard Particle Swarm Optimization algorithm (SPSO-2011), with an adaptive random topology and rotational invariance constituting the main advancements over previous PSO versions. A tracer test conducted in the experimental field at TU Bergakademie Freiberg (Germany) is used as case study. A double-porosity approach is used to simulate the solute transport in the fractured Gneiss aquifer. Tracer concentrations obtained with hydroPSO were in good agreement with its corresponding observations, as measured by a high value of the coefficient of determination and a low sum of squared residuals. Several graphical outputs automatically generated by hydroPSO provided useful insights to assess the quality of the calibration results. It was found that hydroPSO required a small number of model runs to reach the region of the global optimum, and it proved to be both an effective and efficient optimization technique to calibrate the movement of solute transport over time in a fractured aquifer. In addition, the parallel feature of hydroPSO allowed to reduce the total computation time used in the inverse modeling process up to an eighth of the total time required without using that feature. This work provides a first attempt to demonstrate the capability and versatility of hydroPSO to work as an optimizer of a coupled flow and transport model for contaminant migration.

  15. Tubular-Type Hydroturbine Performance for Variable Guide Vane Opening by CFD

    NASA Astrophysics Data System (ADS)

    Kim, Y. T.; Nam, S. H.; Cho, Y. J.; Hwang, Y. C.; Choi, Y. D.; Nam, C. D.; Lee, Y. H.

    Micro hydraulic power generation which has output of less or equal to 100kW is attracting considerable attention. This is because of its small, simple, renewable, and large amount of energy resources. By using a small hydro power generator of which main concept is based on using differential water pressures in pipe lines, energy which was initially wasted by use of a reducing valve at an end of the pipeline, is collected by a turbine in the hydro power generator. A propeller shaped hydroturbine has been used in order to make use of this renewable pressure energy. In this study, in order to acquire basic design data of tubular type hydroturbine, output power, head, and efficiency characteristics due to the guide vane opening angle are examined in detail. Moreover, influences of pressure, tangential and axial velocity distributions on turbine performance are investigated by using a commercial CFD code.

  16. Harnessing Alaska. [Hydroelectric power in Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Four hydropower projects will provide electricity for isolated Alaskan cities by late 1984. A 15Mw project is already producing power. The three remaining hydro projects are described. Tyee Lake is a lake tap project. Water is supplied to the powerhouse by tapping the lake via a tunnel blasted through the lake bottom. Water then flows through a vertical pressure shaft to a power tunnel and into an aboveground powerhouse. Swan Lake consists of a double-curved arch dam and a power tunnel. Terror Lake consists of a concrete-faced compacted rockfill dam and a power tunnel.

  17. Shifts of regional hydro-climatic regimes in the warmer future

    NASA Astrophysics Data System (ADS)

    Kim, H.; Morishita, S.

    2016-12-01

    It is well known that the global climate is projected to be significantly warmer than pre-industrial period, and, in 2015, it was indicated as 1-degreen increase of global mean temperature that was unprecedented previously. Human-induced additional radiative forcing causes global and regional mean temperature increase and alters energy and water partitioning in the heterogeneous pathway. Budyko proposed a conceptual equation to estimate a climate-induced dryness relating available energy and precipitation, and it has been used broadly in hydrology communities to determine regional hydro-climatic characteristics. In this study, a diagnosis framework is proposed to traced how the regional hydro-climatic regimes are shifted under the warming condition with 4 °C increase of global mean temperature. A database for Policy Decision making for Future climate change (d4PDF) based on a super-ensemble AMIP-style experiment (11,400 model years, totally) with sea surface temperature patterns extracted from six CMIP5 models is used to estimate the probability distribution of the regime shifts maximizing signal-to-noise. It was found that the global future hydro-climate condition shifts slightly to more humid condition comparing to the historical condition, since the increase of precipitation is greater and the increate of net radiation, globally. Very humid regions including tropics and semi-arid regions tend to expand, and Semi-humid and arid-regions tend to shrink. Although the change of global mean state between historical and future climate is not considerable, temporal variability under the warming climate is amplified significantly, and it induces more frequent occurrence of once-in-a-century level drought over large terrestrial regions including Africa, South America, East and Central Asia, Australia, and United States. This analysis will be extended up to the availability (expected as October 2016) of a similar database being produced under the Half a degree Additional warming, Projections, Prognosis and Impacts (HAPPI) project following the Paris Agreement, 2015, to aim to limit the increase in global average temperature to 1.5°C above pre-industrial levels.

  18. 76 FR 58260 - FPL Energy Maine Hydro LLC; Madison Paper Industries; Merimil Limited Partnership; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... (FEA) for the project. The FEA contains staff's analysis of the potential environmental effects of... human environment. A copy of the FEA is available for review at the Commission in the Public [[Page...

  19. 76 FR 70440 - Table Mountain Pumped Storage Project; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ...) (3 units x 133 MW units) of generating capacity, with up to 100 MW of additional pumping capacity...-foot-wide right of way. Applicant Contact: Matthew Shapiro, Table Mountain Hydro, LLC., 1210 W...

  20. Hydrometeorological network for flood monitoring and modeling

    NASA Astrophysics Data System (ADS)

    Efstratiadis, Andreas; Koussis, Antonis D.; Lykoudis, Spyros; Koukouvinos, Antonis; Christofides, Antonis; Karavokiros, George; Kappos, Nikos; Mamassis, Nikos; Koutsoyiannis, Demetris

    2013-08-01

    Due to its highly fragmented geomorphology, Greece comprises hundreds of small- to medium-size hydrological basins, in which often the terrain is fairly steep and the streamflow regime ephemeral. These are typically affected by flash floods, occasionally causing severe damages. Yet, the vast majority of them lack flow-gauging infrastructure providing systematic hydrometric data at fine time scales. This has obvious impacts on the quality and reliability of flood studies, which typically use simplistic approaches for ungauged basins that do not consider local peculiarities in sufficient detail. In order to provide a consistent framework for flood design and to ensure realistic predictions of the flood risk -a key issue of the 2007/60/EC Directive- it is essential to improve the monitoring infrastructures by taking advantage of modern technologies for remote control and data management. In this context and in the research project DEUCALION, we have recently installed and are operating, in four pilot river basins, a telemetry-based hydro-meteorological network that comprises automatic stations and is linked to and supported by relevant software. The hydrometric stations measure stage, using 50-kHz ultrasonic pulses or piezometric sensors, or both stage (piezometric) and velocity via acoustic Doppler radar; all measurements are being temperature-corrected. The meteorological stations record air temperature, pressure, relative humidity, wind speed and direction, and precipitation. Data transfer is made via GPRS or mobile telephony modems. The monitoring network is supported by a web-based application for storage, visualization and management of geographical and hydro-meteorological data (ENHYDRIS), a software tool for data analysis and processing (HYDROGNOMON), as well as an advanced model for flood simulation (HYDROGEIOS). The recorded hydro-meteorological observations are accessible over the Internet through the www-application. The system is operational and its functionality has been implemented as open-source software for use in a wide range of applications in the field of water resources monitoring and management, such as the demonstration case study outlined in this work.

  1. Making use of renewable energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnston, J.C.

    1984-01-01

    This book describes renewable energy projects proposed for the rural areas of developing countries. Topics considered include biogas generation in Zimbabwe, biogas technology for water pumping in Botswana, soil fertility and energy problems in rural development in the Zaire rain forest, international scientific collaboration on biogas technologies for rural development, alcohol from biomass, an ethanol project in Zimbabwe, biomass alcohol and the fuel-food issue, solar water heating in Zimbabwe, absorbent box solar cookers, solar crop drying in Zimbabwe, the use of passive solar energy in Botswana buildings, the potential of mini hydro systems, woodfuel as a potential renewable energy source,more » small-scale afforestation for domestic needs in the communal lands of Zimbabwe, muscle power, the use of human energy in construction, hand-operated water pumps, animal power for water pumping in Botswana, the production of charcoal in Zambia, improving the efficiency of a traditional charcoal-burning Burmese cooking stove, social impacts, non-engineering constraints affecting energy use in a rural area, women and energy, and non-technical factors influencing the establishment of fuels-from-crops industries in developing countries.« less

  2. Examining the role of Coulomb static stress transfer in injection-induced seismicity: a generic modeling approach

    NASA Astrophysics Data System (ADS)

    Brown, M. R. M.; Ge, S.

    2017-12-01

    Increased pore pressure decreasing the effective stress on a critically stressed fault has been the accepted mechanism for injection-induced seismicity. This, however, is an over simplified approach that does not take into account the coupled hydro-mechanical effects. In addition, this approach leaves out a possible key stressor in the system, the earthquakes. Earthquakes are known to interact with each other by Coulomb static stress transfer, the process of permanent stress change caused by movement on a fault. In areas of induced seismicity, many small to moderate earthquakes can occur adding to the stress in the system via Coulomb static stress transfer. Here we ask: Is the Coulomb static stress transfer from the earthquakes as important as the pore pressure increase or stress changes caused by coupled hydro-mechanical processes? Is there a point where the Coulomb static stress transfer from the earthquakes becomes the controlling process for inducing future earthquakes? How does the effect of many small earthquakes compare to a few larger events in terms of Coulomb static stress transfer? In this study, we use hydrologic and coupled hydro-mechanical models and USGS Coulomb 3 to assess the importance of induced earthquakes in terms of the stress change in the system. Realistic scenarios of wastewater injection and earthquake magnitude-frequency distributions are used to develop generic models. Model variables and data are varied to evaluate the range of possible outcomes. Preliminary results show that the stress change associated with injection is of the same order of magnitude as the cumulative Coulomb static stress change of a series of small (1

  3. Monitoring River Water Levels from Space: Quality Assessment of 20 Years of Satellite Altimetry Data

    NASA Astrophysics Data System (ADS)

    Bercher, Nicolas; Kosuth, Pascal

    2013-09-01

    This paper presents the results of 20 years of validation of altimetry data for the monitoring of river water levels using a standardized method. The method was initially developed by Cemagref (2006-2011, [5, 6, 3]), now Irste ´a, its implementation is now pursued at LEGOS.Our initial statement was: "what if someone1 wants to use satellite measurements of river water levels ?" The obvious question that comes to mind is "what the quality of the data ?". Moreover, there's also a need - a demand from data producers, to monitor products quality in a standardized fashion.We addressed such questions and have developped a method to assess the quality of, so called, "Alti-Hydro Products". The method was implemented for the following Alti-Hydro products (and automatically derived from a L2 product*) : AVISO* (Topex/Poseidon, Jason-2), CASH project (Topex/Poseidon), HydroWeb (Topex/Poseidon, ENVISAT), River & Lake Hydrology (ERS-2, ENVISAT) and PISTACH* (Jason-2).

  4. Experimental Hydro-Mechanical Characterization of Full Load Pressure Surge in Francis Turbines

    NASA Astrophysics Data System (ADS)

    Müller, A.; Favrel, A.; Landry, C.; Yamamoto, K.; Avellan, F.

    2017-04-01

    Full load pressure surge limits the operating range of hydro-electric generating units by causing significant power output swings and by compromising the safety of the plant. It appears during the off-design operation of hydraulic machines, which is increasingly required to regulate the broad integration of volatile renewable energy sources into the existing power network. The underlying causes and governing physical mechanisms of this instability were investigated in the frame of a large European research project and this paper documents the main findings from two experimental campaigns on a reduced scale model of a Francis turbine. The multi-phase flow in the draft tube is characterized by Particle Image Velocimetry, Laser Doppler Velocimetry and high-speed visualizations, along with synchronized measurements of the relevant hydro-mechanical quantities. The final result is a comprehensive overview of how the unsteady draft tube flow and the mechanical torque on the runner shaft behave during one mean period of the pressure oscillation, thus defining the unstable fluid-structure interaction responsible for the power swings. A discussion of the root cause is initiated, based on the state of the art. Finally, the latest results will enable a validation of recent RANS flow simulations used for determining the key parameters of hydro-acoustic stability models.

  5. Study of the use of a micro hydro in knockdown container completed with a cylindrical form housing of francis hydraulic turbine to support the development program of energy self-sustainability for remote and isolated areas in Indonesia

    NASA Astrophysics Data System (ADS)

    Kamal, Samsul; Prajitno; Pardadi, Janu

    2017-11-01

    With an intention to reduce the consumption of energy from fossil fuels and the CO2 emission in relation with the climate change solution, Indonesian Government has targeted that the role of the New and Renewable Energy (NRE) resources reaches at least 23% , or about 27 GW , in 2025 and it is expected to increase to the extent of about 134 GW in 2050 within the scenario of mixed energy supply. Geographically Indonesia has many remote and isolated areas with lack of appropriate infrastructure supports. But in the most of the areas, huge potential of new and renewable energy are available such as hydro energy is about 75 GW, biomass energy is about 32 GW and bio fuel is about 32 GW. The total utilization of the energy from small hydro energy up to this year for example is only about 300 MW. The significant obstacle in optimizing the utilization of small hydro energy in the areas is mainly on the infrastructure conditions and the local manufacture capabilities. Difficulties in mobilization of experts, skill worker , parts and constructions material result in very time consuming and costly for site construction. In this research a hydro turbine built in knock down container completed with a Francis turbine in cylindrical form housing is proposed and reported its performance on implementation. The hydro in a knock down container concept comes from the idea to manufacture hydro power solutions in a knock down container, readymade to be transported to installation sites. It can be easily manufactured in a quality controlled and cost effective environment, transported and installed in remote areas, to operate and maintain with minimal amount of equipment. It shows that the implementation of the unit in a remote area has reduced the total site construction time by 1/3 compared to the predicted one with conventional unit. The performance of the Francis turbine with cylindrical form housing has shown comparable with the conventional one which has volute form housing. The superiority was even more pronounced by introducing a deflection insert in its input flow channel. The insertion was capable to create more distributed flow into the runner. Efficiency of the turbine up to 80% was performed in this research. Local manufacture for turbine usually use many craft work and welding to built a volute form housing for the Francis turbine. The cylindrical form housing here has also proven significantly in reducing the time and price for the turbine manufacturing process.

  6. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... level (msl); (2) a powerhouse with two reversible pump-turbine units with a total installed capacity of... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  7. Quantifying Risks in the Global Water-Food-Climate Nexus in the Coming Decades: An Integrated Modeling Approach

    NASA Astrophysics Data System (ADS)

    Schlosser, C. A.; Strzepek, K.; Arndt, C.; Gueneau, A.; Cai, Y.; Gao, X.; Robinson, S.; Sokolov, A. P.; Thurlow, J.

    2011-12-01

    The growing need for risk-based assessments of impacts and adaptation to regional climate change calls for the quantification of the likelihood of regional outcomes and the representation of their uncertainty. Moreover, our global water resources include energy, agricultural and environmental systems, which are linked together as well as to climate. With the prospect of potential climate change and associated shifts in hydrologic variation and extremes, the MIT Integrated Global Systems Model (IGSM) framework, in collaboration with UNU-WIDER, has enhanced its capabilities to model impacts (or effects) on the managed water-resource systems. We first present a hybrid approach that extends the MIT Integrated Global System Model (IGSM) framework to provide probabilistic projections of regional climate changes. This procedure constructs meta-ensembles of the regional hydro-climate, combining projections from the MIT IGSM that represent global-scale uncertainties with regionally resolved patterns from archived climate-model projections. From these, a river routing and water-resource management module allocates water among irrigation, hydropower, urban/industrial, and in-stream uses and investigate how society might adapt water resources due to shifts in hydro-climate variations and extremes. These results are then incorporated into economic models allowing us to consider the implications of climate for growth, land use, and development prospects. In this model-based investigation, we consider how changes in the regional hydro-climate over major river basins in southern Africa, Vietnam, as well as the United States impact agricultural productivity and water-management systems, and whether adaptive strategies can cope with the more severe climate-related threats to growth and development. All this is cast under a probabilistic description of regional climate changes encompassed by the IGSM framework.

  8. Integrated Hydro-geomorphological Monitoring System of the Upper Bussento river basin (Cilento and Vallo Diano Geopark, S-Italy)

    NASA Astrophysics Data System (ADS)

    Guida, D.; Cuomo, A.; Longobardi, A.; Villani, P.; Guida, M.; Guadagnuolo, D.; Cestari, A.; Siervo, V.; Benevento, G.; Sorvino, S.; Doto, R.; Verrone, M.; De Vita, A.; Aloia, A.; Positano, P.

    2012-04-01

    The Mediterranean river ecosystem functionings are supported by river-aquifer interactions. The assessment of their ecological services requires interdisciplinary scientific approaches, integrate monitoring systems and inter-institutional planning and management. This poster illustrates the Hydro-geomorphological Monitoring System build-up in the Upper Bussento river basin by the University of Salerno, in agreement with the local Basin Autorities and in extension to the other river basins located in the Cilento and Vallo Diano National Park (southern Italy), recently accepted in the European Geopark Network. The Monitoring System is based on a hierarchical Hydro-geomorphological Model (HGM), improved in a multiscale, nested and object-oriented Hydro-geomorphological Informative System (HGIS, Figure 1). Hydro-objects are topologically linked and functionally bounded by Hydro-elements at various levels of homogeneity (Table 1). Spatial Hydro-geomorpho-system, HG-complex and HG-unit support respectively areal Hydro-objects, as basin, sector and catchment and linear Hydro-objects, as river, segment, reach and section. Runoff initiation points, springs, disappearing points, junctions, gaining and water losing points complete the Hydro-systems. An automatic procedure use the Pfafstetter coding to hierarchically divide a terrain into arbitrarily small hydro-geomorphological units (basin, interfluve, headwater and no-contribution areas, each with a unique label with hierarchical topological properties. To obtain a hierarchy of hydro-geomorphological units, the method is then applied recursively on each basin and interbasin, and labels of the subdivided regions are appended to the existing label of the original region. The monitoring stations are ranked consequently in main, secondary, temporary and random and located progressively at the points or sections representative for the hydro-geomorphological responses by validation control and modeling calibration. The datasets are organized into a relational geodatabase supporting tracer testings, space-time analysis and hydrological modeling. At the moment, three main station for hourly streamflow measurements are located at the terminal sections of the main basin and the two main sub-basin; secondary stations for weekly discharge measurements are located along the Upper Bussento river segment, upstream and downstream of each river reach or tributary catchments or karst spring inflow. Temporary stations are located in the representative sections of the catchments to detect stream flow losses into alluvial beds or experimental parcels in the bare karst and forested sandstone headwaters. Streamflow measurements are combined with geochemical survey and water sampling for Radon activity concentration measurements. Results of measurement campains in Radon space-time distribution within the basin are given in other contribution of same EGU session. Monitoring results confirm the hourly, daily, weekly and monthly hydrological data and validate outcomes of semi-distributed hydrological models based on previously time series, allowing both academic consultants and institutional subject to extend the Integrated Hydro-geomorphological Monitoring System to the surrounding drainage areas of the Cilento and Vallo di Diano Geopark. Keywords: River-aquifer interaction, Upper Bussento river basin, monitoring system, hydro-geomorphology, semi-distributed hydrological model. Table 1: Comparative, hierarchical Hydro-morpho-climate entities Hierarchy levelArea (Km2) Scale Orography Entity Climate Entity Morfological Entity Areal Drainage Entity Linear Drainage Entity VIII 106 1:15E6 Orogen Macroscale α Morphological Region Hydrological Region VII 105 1:10E6 Chain Sistem Macroscale β Morphological Province Hydrological Province VI 104 1:5E5 Chain Mesoscale α Morphological Sistem Basin River V 103 1:2,5E5Chain Segment Mesoscale β Morphological Sub-systemSub-Basin Torrent IV 100 1:1,0E5Orographic Group Mesoscale γ Morphological Complex Basin Sector Mid Order Channel/ Segment III 10 1: 5E4 Orographic System Microscale αMorphological Unit Watershed Low Order Channel/ Reach II 1 1:2,5E3Orographic ComplexMicroscale βMorphological ComponentCatchment Transient Channel/ Pool I 10-2 1:5E3 Orographic Unit Microscale γMorphological Element Hollow Zero Order Channel PIC

  9. Advancing an Information Model for Environmental Observations

    NASA Astrophysics Data System (ADS)

    Horsburgh, J. S.; Aufdenkampe, A. K.; Hooper, R. P.; Lehnert, K. A.; Schreuders, K.; Tarboton, D. G.; Valentine, D. W.; Zaslavsky, I.

    2011-12-01

    Observational data are fundamental to hydrology and water resources, and the way they are organized, described, and shared either enables or inhibits the analyses that can be performed using the data. The CUAHSI Hydrologic Information System (HIS) project is developing cyberinfrastructure to support hydrologic science by enabling better access to hydrologic data. HIS is composed of three major components. HydroServer is a software stack for publishing time series of hydrologic observations on the Internet as well as geospatial data using standards-based web feature, map, and coverage services. HydroCatalog is a centralized facility that catalogs the data contents of individual HydroServers and enables search across them. HydroDesktop is a client application that interacts with both HydroServer and HydroCatalog to discover, download, visualize, and analyze hydrologic observations published on one or more HydroServers. All three components of HIS are founded upon an information model for hydrologic observations at stationary points that specifies the entities, relationships, constraints, rules, and semantics of the observational data and that supports its data services. Within this information model, observations are described with ancillary information (metadata) about the observations to allow them to be unambiguously interpreted and used, and to provide traceable heritage from raw measurements to useable information. Physical implementations of this information model include the Observations Data Model (ODM) for storing hydrologic observations, Water Markup Language (WaterML) for encoding observations for transmittal over the Internet, the HydroCatalog metadata catalog database, and the HydroDesktop data cache database. The CUAHSI HIS and this information model have now been in use for several years, and have been deployed across many different academic institutions as well as across several national agency data repositories. Additionally, components of the HIS have been modified to support data management for the Critical Zone Observatories (CZOs). This paper will present limitations of the existing information model used by the CUAHSI HIS that have been uncovered through its deployment and use, as well as new advances to the information model, including: better representation of both in situ observations from field sensors and observations derived from environmental samples, extensibility in attributes used to describe observations, and observation provenance. These advances have been developed by the HIS team and the broader scientific community and will enable the information model to accommodate and better describe wider classes of environmental observations and to better meet the needs of the hydrologic science and CZO communities.

  10. Overview of the Manitou Experimental Forest Observatory: Site description and selected science results from 2008-2013

    EPA Science Inventory

    The Bio-hydro-atmosphere interactions of Energy, Aerosols, Carbon, H2O, Organics & Nitrogen (BEACHON) project seeks to understand the feedbacks and inter-relationships between hydrology, biogenic emissions, carbon assimilation, aerosol properties, clouds and associated...

  11. Understanding hydro-climatic drivers of infectious diarrheal diseases in South Asia and their projected risks from regional climate models

    NASA Astrophysics Data System (ADS)

    Hasan, M. A.; Akanda, A. S.; Jutla, A.; Huq, A.; Colwell, R. R.

    2017-12-01

    Diarrheal diseases remain a major threat to global public health and are the second largest cause of death for children under the age of five. Cholera and Rotavirus diarrhea together comprise more than two-thirds of the diarrheal morbidity in South Asia. Recent studies have shown strong influences of hydrologic processes and climatic variabilities on the onset, intensity, and seasonality of the outbreaks of these diseases. However, our understanding of the propagation and manifestation of these diseases in a changing climate in vulnerable regions of the world are still limited. In this study, we build on our understanding of the role of the hydro-climatic drivers of diarrheal diseases in South Asia in recent decades to project the probable risks of the diseases in this century using the climate projection scenarios from dynamically downscaled climate models. To build the current model, we conducted a multivariate logistic regression assessment using 34 climate indices to examine the role of temperature and rainfall extremes over the seasonality of rotavirus and cholera over a South Asian country, Bangladesh. We utilize the availability of long and reliable time-series of cholera and rotavirus from Bangladesh and conducted a temporal and spatial analysis derived from both ground and satellite observations. For projecting the future risks of the diseases, we used five bias-corrected Regional Climate Model (RCM) results of the CMIP5 series under the RCP 4.5 scenario. Cholera risk shows a significantly higher rate of increase compared to Rotavirus in Bangladesh in the 21st century. As the disease is significantly influenced by extreme rainfall, majority projections showed a significant increase in flood-driven cholera risk. Most RCMs suggest a warmer winter in future years, suggesting reduced risk for Rotavirus. However, as the dryness of the climate is also highly correlated with rotavirus epidemics, the incremental risk of the disease due to drier winters would likely undermine the reduced risk due to temperature increase. Probabilistic risk assessments of these diarrheal diseases with respect to hydro-climatic variability will, not only improve the local policymaking processes, but also allow us to pinpoint the climate-health hotspots around the globe.

  12. The H3O-project: towards sustainable use and management of the Flemish-Dutch subsurface

    NASA Astrophysics Data System (ADS)

    Vernes, Ronald W.; Deckers, Jef; Doornenbal, Hans C.; den Dulk, Maryke; Hummelman, Jan; Menkovic, Armin; Westerhoff, Wim; Witmans, Nora; Dusar, Michiel; Walstra, Jan; Reindersma, Reinder

    2014-05-01

    The collection and unambiguous interpretation and analysis of (hydro)geological information on both sides of the border are essential ingredients in the management of natural resources and use of the subsurface in the border region. The information currently available from the neighbouring countries often lacks compatibility and the same amount of detail. In 2012 the "H3O" project got under way which aims at a consistent interpretation of the subsurface in the Flemish-Dutch border region. Parties in the Netherlands (Provinces of Limburg and Noord-Brabant and TNO) and Flanders (The Environment, Nature and Energy Department of the Flemish Government, the Flemish Environment Agency, VITO and the Geological Survey of Belgium) are cooperating to harmonise the geological and hydrogeological models of the Netherlands (DGM and REGIS II) and Flanders (Geological 3D model and HCOV). This project is called "H3O" which stands for "(Hydro)geologische 3d-modellering Ondergrond". The H3O project focuses on the Roer Valley Graben that runs from Germany in a north-westerly direction over the central part of Limburg, the north-easterly part of the Belgian province of Limburg to Noord-Brabant and is bordered by major fault zones along the north and south perimeters. The aim of the project is to make a cross-border, up-to-date, three-dimensional geological and hydrogeological model of the Quaternary and Tertiary deposits in the Limburg, Southeast Brabant and Flemish part of this region. This will help to identify, study and rectify the differences between the existing (hydro)geological interpretations. The work is supervised by a committee of experts and carried out by VITO, the Belgian Geological Survey and the Geological Survey of the Netherlands of TNO. These organisations have extensive knowledge of the stratigraphy and regional geology as well as experience of creating 3D models of the subsurface (Geological 3D model of Flanders, DGM, REGIS, GeoTOP). Delivery and presentation of the final results are expected in the spring of 2014.

  13. 75 FR 16093 - Turnbull Hydro, LLC; Notice of Application Accepted for Filing, Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... Turnbull Drop Project, the applicant proposes to (1) change the hydraulic capacity from 600 cfs to 750 cfs... hydraulic capacity from 600 cfs to 750 cfs; (2) change the authorized installed capacity from 4,100 kW to 5...

  14. 76 FR 28766 - Black Canyon Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    .... The proposed project would consist of the following: (1) An approximately 35-foot-wide, 7-foot-tall inflatable dam; (2) a 90-foot- wide, 7-foot-tall diversion intake structure; (3) a 9-foot-wide, 7- foot-tall...

  15. Simulated impacts of climate change on phosphorus loading to Lake Michigan

    USGS Publications Warehouse

    Robertson, Dale M.; Saad, David A.; Christiansen, Daniel E.; Lorenz, David J

    2016-01-01

    Phosphorus (P) loading to the Great Lakes has caused various types of eutrophication problems. Future climatic changes may modify this loading because climatic models project changes in future meteorological conditions, especially for the key hydrologic driver — precipitation. Therefore, the goal of this study is to project how P loading may change from the range of projected climatic changes. To project the future response in P loading, the HydroSPARROW approach was developed that links results from two spatially explicit models, the SPAtially Referenced Regression on Watershed attributes (SPARROW) transport and fate watershed model and the water-quantity Precipitation Runoff Modeling System (PRMS). PRMS was used to project changes in streamflow throughout the Lake Michigan Basin using downscaled meteorological data from eight General Circulation Models (GCMs) subjected to three greenhouse gas emission scenarios. Downscaled GCMs project a + 2.1 to + 4.0 °C change in average-annual air temperature (+ 2.6 °C average) and a − 5.1% to + 16.7% change in total annual precipitation (+ 5.1% average) for this geographic area by the middle of this century (2045–2065) and larger changes by the end of the century. The climatic changes by mid-century are projected to result in a − 21.2% to + 8.9% change in total annual streamflow (− 1.8% average) and a − 29.6% to + 17.2% change in total annual P loading (− 3.1% average). Although the average projected changes in streamflow and P loading are relatively small for the entire basin, considerable variability exists spatially and among GCMs because of their variability in projected future precipitation.

  16. Blue and green infrastructures implementation to solve stormwater management issues in a new urban development project - a modelling approach

    NASA Astrophysics Data System (ADS)

    Versini, Pierre-Antoine; Tchiguirinskaia, Ioulia; Schertzer, Daniel

    2016-04-01

    Concentrating buildings and socio-economic activities, urban areas are particularly vulnerable to hydrological risks. Modification in climate may intensify already existing issues concerning stormwater management (due to impervious area) and water supply (due to the increase of the population). In this context, water use efficiency and best water management practices are key-issues in the urban environment already stressed. Blue and green infrastructures are nature-based solutions that provide synergy of the blue and green systems to provide multifunctional solutions and multiple benefits: increased amenity, urban heat island improvement, biodiversity, reduced energy requirements... They are particularly efficient to reduce the potential impact of new and existing developments with respect to stormwater and/or water supply issues. The Multi-Hydro distributed rainfall-runoff model represents an adapted tool to manage the impacts of such infrastructures at the urban basin scale. It is a numerical platform that makes several models interact, each of them representing a specific portion of the water cycle in an urban environment: surface runoff and infiltration depending on a land use classification, sub-surface processes and sewer network drainage. Multi-Hydro is still being developed at the Ecole des Ponts (open access from https://hmco.enpc.fr/Tools-Training/Tools/Multi-Hydro.php) to take into account the wide complexity of urban environments. The latest advancements have made possible the representation of several blue and green infrastructures (green roof, basin, swale). Applied in a new urban development project located in the Paris region, Multi-Hydro has been used to simulate the impact of blue and green infrastructures implementation. It was particularly focused on their ability to fulfil regulation rules established by local stormwater managers in order to connect the parcel to the sewer network. The results show that a combination of several blue and green infrastructures, if they are widely implemented, could represent an efficient tool to ensure regulation rules at the parcel scale.

  17. A remark on the sign change of the four-particle azimuthal cumulant in small systems

    NASA Astrophysics Data System (ADS)

    Bzdak, Adam; Ma, Guo-Liang

    2018-06-01

    The azimuthal cumulants, c2 { 2 } and c2 { 4 }, originating from the global conservation of transverse momentum in the presence of hydro-like elliptic flow are calculated. We observe the sign change of c2 { 4 } for small number of produced particles. This is in a qualitative agreement with the recent ATLAS measurement of multi-particle azimuthal correlations with the subevent cumulant method.

  18. SLH Timing Belt Powertrain

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, Abe

    2014-04-09

    The main goal of this proposal was to develop and test a novel powertrain solution for the SLH hydroEngine, a low-cost, efficient low-head hydropower technology. Nearly two-thirds of U.S. renewable electricity is produced by hydropower (EIA 2010). According to the U.S. Department of Energy; this amount could be increased by 50% with small hydropower plants, often using already-existing dams (Hall 2004). There are more than 80,000 existing dams, and of these, less than 4% generate power (Blankinship 2009). In addition, there are over 800 irrigation districts in the U.S., many with multiple, non-power, low-head drops. These existing, non-power dams andmore » irrigation drops could be retrofitted to produce distributed, baseload, renewable energy with appropriate technology. The problem is that most existing dams are low-head, or less than 30 feet in height (Ragon 2009). Only about 2% of the available low-head hydropower resource in the U.S. has been developed, leaving more than 70 GW of annual mean potential low-head capacity untapped (Hall 2004). Natel Energy, Inc. is developing a low-head hydropower turbine that operates efficiently at heads less than 6 meters and is cost-effective for deployment across multiple low-head structures. Because of the unique racetrack-like path taken by the prime-movers in the SLH, a flexible powertrain is required. Historically, the only viable technological solution was roller chain. Despite the having the ability to easily attach blades, roller chain is characterized by significant drawbacks, including high cost, wear, and vibration from chordal action. Advanced carbon- fiber-reinforced timing belts have been recently developed which, coupled with a novel belt attachment system developed by Natel Energy, result in a large reduction in moving parts, reduced mass and cost, and elimination of chordal action for increased fatigue life. The work done in this project affirmatively addressed each of the following 3 major uncertainties concerning a timing-belt based hydroEngine powertrain: 1. Can a belt handle the high torques and power loads demanded by the SLH? (Yes.) 2. Can the SLH blades be mounted to belt with a connection that can withstand the loads encountered in operation? (Yes.) 3. Can the belt, with blade attachments, live through the required cyclic loading? (Yes.) The research adds to the general understanding of sustainable small hydropower systems by using innovative system testing to develop and demonstrate performance of a novel powertrain solution, enabling a new type of hydroelectric turbine to be commercially developed. The technical effectiveness of the methods investigated has been shown to be positive through an extensive design and testing process accommodating many constraints and goals, with a major emphasis on high cycle fatigue life. Economic feasibility of the innovations has been demonstrated through many iterations of design for manufacturability and cost reduction. The project is of benefit to the public because it has helped to develop a solution to a major problem -- despite the large available potential for new low-head hydropower, high capital costs and high levelized cost of electricity (LCOE) continue to be major barriers to project development. The hydroEngine represents a significant innovation, leveraging novel fluid mechanics and mechanical configuration to allow lower-cost turbine manufacture and development of low head hydropower resources.« less

  19. 78 FR 21931 - Pelzer Hydro Company, Inc. Consolidated Hydro Southeast, Inc.; Notice of Intent To File License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ...] Pelzer Hydro Company, Inc. Consolidated Hydro Southeast, Inc.; Notice of Intent To File License.... Submitted by: Pelzer Hydro Company, Inc. and Consolidated Hydro Southeast, Inc., both fully owned... at [email protected] . j. Pelzer Hydro Company, Inc. and Consolidated Hydro Southeast, Inc., filed...

  20. HydroCube mission concept: P-Band signals of opportunity for remote sensing of snow and root zone soil moisture

    NASA Astrophysics Data System (ADS)

    Yueh, Simon; Shah, Rashmi; Xu, Xiaolan; Elder, Kelly; Chae, Chun Sik; Margulis, Steve; Liston, Glen; Durand, Michael; Derksen, Chris

    2017-09-01

    We have developed the HydroCube mission concept with a constellation of small satellites to remotely sense Snow Water Equivalent (SWE) and Root Zone Soil Moisture (RZSM). The HydroCube satellites would operate at sun-synchronous 3- day repeat polar orbits with a spatial resolution of about 1-3 Km. The mission goals would be to improve the estimation of terrestrial water storage and weather forecasts. Root-zone soil moisture and snow water storage in land are critical parameters of the water cycle. The HydroCube Signals of Opportunity (SoOp) concept utilizes passive receivers to detect the reflection of strong existing P-band radio signals from geostationary Mobile Use Objective System (MUOS) communication satellites. The SWE remote sensing measurement principle using the P-band SoOp is based on the propagation delay (or phase change) of radio signals through the snowpack. The time delay of the reflected signal due to the snowpack with respect to snow-free conditions is directly proportional to the snowpack SWE. To address the ionospheric delay at P-band frequencies, the signals from both MUOS bands (360-380 MHz and 250-270 MHz) would be used. We have conducted an analysis to trade off the spatial resolution for a space-based sensor and measurement accuracy. Through modeling analysis, we find that the dual-band MUOS signals would allow estimation of soil moisture and surface roughness together. From the two MUOS frequencies at 260 MHz and 370 MHz, we can retrieve the soil moisture from the reflectivity ratio scaled by wavenumbers using the two P-band frequencies for MUOS. A modeling analysis using layered stratified model has been completed to determine the sensitivity requirements of HydroCube measurements. For mission concept demonstration, a field campaign has been conducted at the Fraser Experimental Forest in Colorado since February 2016. The data acquired has provided support to the HydroCube concept.

  1. River reach classification for the Greater Mekong Region at high spatial resolution

    NASA Astrophysics Data System (ADS)

    Ouellet Dallaire, C.; Lehner, B.

    2014-12-01

    River classifications have been used in river health and ecological assessments as coarse proxies to represent aquatic biodiversity when comprehensive biological and/or species data is unavailable. Currently there are no river classifications or biological data available in a consistent format for the extent of the Greater Mekong Region (GMR; including the Irrawaddy, the Salween, the Chao Praya, the Mekong and the Red River basins). The current project proposes a new river habitat classification for the region, facilitated by the HydroSHEDS (HYDROlogical SHuttle Elevation Derivatives at multiple Scales) database at 500m pixel resolution. The classification project is based on the Global River Classification framework relying on the creation of multiple sub-classifications based on different disciplines. The resulting classes from the sub-classification are later combined into final classes to create a holistic river reach classification. For the GMR, a final habitat classification was created based on three sub-classifications: a hydrological sub-classification based only on discharge indices (river size and flow variability); a physio-climatic sub-classification based on large scale indices of climate and elevation (biomes, ecoregions and elevation); and a geomorphological sub-classification based on local morphology (presence of floodplains, reach gradient and sand transport). Key variables and thresholds were identified in collaboration with local experts to ensure that regional knowledge was included. The final classification is composed 54 unique final classes based on 3 sub-classifications with less than 15 classes each. The resulting classifications are driven by abiotic variables and do not include biological data, but they represent a state-of-the art product based on best available data (mostly global data). The most common river habitat type is the "dry broadleaf, low gradient, very small river". These classifications could be applied in a wide range of hydro-ecological assessments and useful for a variety of stakeholders such as NGO, governments and researchers.

  2. TidGen Power System Commercialization Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sauer, Christopher R.; McEntee, Jarlath

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement formore » the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.« less

  3. Combining abiotic and biotic models - Hydraulical modeling to fill the gap between catchment and hydro-dynamic models

    NASA Astrophysics Data System (ADS)

    Guse, B.; Sulc, D.; Schmalz, B.; Fohrer, N.

    2012-04-01

    The European Water Framework Directive (WFD) requires a catchment-based approach, which is assessed in the IMPACT project by combining abiotic and biotic models. The core point of IMPACT is a model chain (catchment model -> 1-D-hydraulic model -> 3-D-hydro-morphodynamic model -> biotic habitat model) with the aim to estimate the occurrence of the target species of the WFD. Firstly, the model chain is developed for the current land use and climate conditions. Secondly, land use and climate change scenarios are developed at the catchment scale. The outputs of the catchment model for the scenarios are used as input for the next models within the model chain to estimate the effect of these changes on the target species. The eco-hydrological catchment model SWAT is applied for the Treene catchment in Northern Germany and delivers discharge and water quality parameters as a spatial explicit output for each subbasin. There is no water level information given by SWAT. However, water level values are needed as lower boundary condition for the hydro-dynamic and habitat models which are applied for the 300 m candidate reference reach. In order to fill the gap between the catchment and the hydro-morphodynamic model, the 1-D hydraulic model HEC-RAS is applied for a 3 km long reach transect from the next upstream hydrological station until the upper bound of the candidate study reach. The channel geometry for HEC-RAS was estimated based on 96 cross-sections which were measured in the IMPACT project. By using available discharge and water level measurements from the hydrological station and own flow velocity measurements, the channel resistence was estimated. HEC-RAS was run with different statistical indices (mean annual drought, mean discharge, …) for steady flow conditions. The rating curve was then constructed for the target cross-section, i.e. the lower bound of the candidate study reach, to fulfill the combining with the hydro- and morphodynamic models. These statistical indices can also be calculated for the discharge series provided by land use and climate scenarios. In this way, the effect of land use and climate change on the catchment and the hydraulic processes can be assessed.

  4. Contextualized Science for Teaching Science and Technology.

    ERIC Educational Resources Information Center

    Koul, Ravinder; Dana, Thomas M.

    1997-01-01

    Discusses science education in India, arguing that a contextualized curriculum is a powerful means of improvement. The paper presents results from an analysis of the treatment of the nature of science and technology in current Indian textbooks and uses India's controversial Sadar Sarovar Hydro-Electric Project as a case example. (SM)

  5. 76 FR 1613 - Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13877-000] Mahoning Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications January 4, 2011. On November 4, 2010, Mahoning Hydro, LLC...

  6. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... excessive siltation, erosion, rapid dewatering, or exposure to high wind, wave, or current action and/or in..., hydro-electric power stations, work areas, water intake structures, etc. No shoreline use permits will... costs, one year permits should be issued only when the location or nature of the activity requires...

  7. Standards-based publication and sharing of time series information in the DRIHM project: a EU-US collaboration

    NASA Astrophysics Data System (ADS)

    Hooper, Richard; Zaslavsky, Ilya; Parodi, Antonio; Gochis, David; Jha, Shantenu; Whitenack, Thomas; Valentine, David; Caumont, Olivier; Dekic, Ljiljana; Ivkovic, Marija; Molini, Luca; Bedrina, Tatiana; Gijsbers, Peter J. A.; de Rooij, Erik; Rebora, Nicola

    2013-04-01

    To enable a plug-and-play infrastructure, the European DRIHM (Distributed Research Infrastructure for Hydro-Meteorology) project aims to develop a comprehensive data publication and sharing system presenting uniform standards-based data discovery and access interfaces for hydrometeorological data collected by DRIHM partners in several European countries. This is a challenging task due to heterogeneity in types of data being collected and organized for modeling, and different semantic and structural conventions adopted by different data publishers. To meet this goal, the DRIHM project, and its DRIHM2US extension, collaborates with the recently funded US SCIHM (Standards-based Cyberinfrastructure for HydroMeteorology) project to develop a data sharing infrastructure for time series information. We report initial results of the application of the data integrating technologies developed by the NSF-funded CUAHSI HIS (Consortium of Universities for the Advancement of Hydrologic Data, Inc., Hydrologic Information System) project, to information collected within DRIHM. The CUAHSI HIS system has been widely used in the US; it provides access to about a hundred water data collections that can be queried via uniform web services. The DRIHM partners initially implementing the system, include the CIMA Research Foundation (Italy), the French National Center for Scientific Research (CNRS), and the Republic Hydrometeorological Service of Serbia. The collected time series information was ingested into CUAHSI Observations Data Model databases, and water data services were created for each of the partners. At the time of writing, the water data services include SOAP and REST endpoints that provide access to the time series in WaterML 1 and WaterML 2.0 formats. The former encoding, developed by CUAHSI HIS, has been adopted by a number of federal agencies and research groups in the US, while the latter, created by an international group of experts under the aegis of the Hydrology Domain Working Group of the Open Geospatial Consortium and the World Meteorological Organization, has been recently adopted as an international standard for exchanging hydrologic data. The services are registered at the central catalog, which supports discovery of time series based on their spatio-temporal characteristics and on variable semantics. The semantics of the measurements is aligned , in the process of publication and service registration, with a set of centrally managed controlled vocabularies and a parameter vocabulary. Data from multiple collections can be discovered, accessed, visualized and analyzed using CUAHSI HydroDesktop software, or other clients that support water data service interfaces. While HydroDesktop relies on WaterML 1 format, the Delft FEWS system, maintained by a DRIHM partner Deltares, is already capable of ingesting WaterML 2.0 services, which enables interfacing WaterML 2.0-formatted streams with forecast models. Development of a consistent data sharing system is one of the first steps in realizing DRIHM objectives. Next steps include further integration of water data services with simulation models, WRF and WRF-Hydro in particular, and integrating point time series with gridded information to be used as model input. We discuss these additional steps and associated challenges, and demonstrate the complementarity and benefits of US-EU collaboration in the development of global standards-based infrastructure for hydrometeorological data.

  8. Addressing Hydro-economic Modeling Limitations - A Limited Foresight Sacramento Valley Model and an Open-source Modeling Platform

    NASA Astrophysics Data System (ADS)

    Harou, J. J.; Hansen, K. M.

    2008-12-01

    Increased scarcity of world water resources is inevitable given the limited supply and increased human pressures. The idea that "some scarcity is optimal" must be accepted for rational resource use and infrastructure management decisions to be made. Hydro-economic systems models are unique at representing the overlap of economic drivers, socio-political forces and distributed water resource systems. They demonstrate the tangible benefits of cooperation and integrated flexible system management. Further improvement of models, quality control practices and software will be needed for these academic policy tools to become accepted into mainstream water resource practice. Promising features include: calibration methods, limited foresight optimization formulations, linked simulation-optimization approaches (e.g. embedding pre-existing calibrated simulation models), spatial groundwater models, stream-aquifer interactions and stream routing, etc.. Conventional user-friendly decision support systems helped spread simulation models on a massive scale. Hydro-economic models must also find a means to facilitate construction, distribution and use. Some of these issues and model features are illustrated with a hydro-economic optimization model of the Sacramento Valley. Carry-over storage value functions are used to limit hydrologic foresight of the multi- period optimization model. Pumping costs are included in the formulation by tracking regional piezometric head of groundwater sub-basins. To help build and maintain this type of network model, an open-source water management modeling software platform is described and initial project work is discussed. The objective is to generically facilitate the connection of models, such as those developed in a modeling environment (GAMS, MatLab, Octave, "), to a geographic user interface (drag and drop node-link network) and a database (topology, parameters and time series). These features aim to incrementally move hydro- economic models in the direction of more practical implementation.

  9. Berkeley Sensor Database, an Implementation of CUAHSI's ODM for the Keck HydroWatch Wireless Sensor Network

    NASA Astrophysics Data System (ADS)

    Ogle, G.; Bode, C.; Fung, I.

    2010-12-01

    The Keck HydroWatch Project is a multidisciplinary project devoted to understanding how water interacts with atmosphere, vegetation, soil, and fractured bedrock. It is experimenting with novel techniques to monitor and trace water pathways through these mediums, including developing an intensive wireless sensor network, in the Angelo Coast Range and Sagehen Reserves in California. The sensor time-series data is being supplemented with periodic campaigns experimenting with sampling and tracing techniques, including water chemistry, stable isotope analysis, electrical resistivity tomography (ERT), and neutron probes. Mechanistic and statistical modeling is being performed with these datasets. One goal of the HydroWatch project is to prototype technologies for intensive sampling that can be upscaled to the watershed scale. The Berkeley Sensor Database was designed to manage the large volumes of heterogeneous data coming from this sensor network. This system is based on the Observations Data Model (ODM) developed by the Consortium of Universities for the Advancement of Hydrologic Science, Inc. (CUAHSI). Due to need for the use of open-source software, UC Berkeley ported the ODM to a LAMP system (Linux, Apache, MySQL, Perl). As of August 2010, the Berkeley Sensor Database contains 33 million measurements from 1200 devices, with several thousand new measurements being added each hour. Data for this research is being collected from a wide variety of equipment. Some of this equipment is experimental and subject to constant modification, others are industry standards. Well pressure transducers, sap flow sensors, experimental microclimate motes, standard weather stations, and multiple rock and soil moisture sensors are some examples. While the Hydrologic Information System (HIS) and the ODM are optimized for data interoperability, they are not focused on facility management and data quality control which occur at a complex research site. In this presentation, we describe our implementation of the ODM, the modifications we made to the ODM schema to include incident reports, concepts of 'stations', reuse and moving of equipment, and NASA data quality levels. The HydroWatch researchers' data use vary radically, so we implemented a number of different accessors to the data, from real-time graphing during storms to direct SQL queries for automated analysis to full data dumps for heavy statistical modeling.

  10. Managing Climate Change Refugia for Biodiversity ...

    EPA Pesticide Factsheets

    Climate change threatens to create fundamental shifts in in the distributions and abundances of species. Given projected losses, increased emphasis on management for ecosystem resilience to help buffer fish and wildlife populations against climate change is emerging. Such efforts stake a claim for an adaptive, anticipatory planning response to the climate change threat. To be effective, approaches will need to address critical uncertainties in both the physical basis for projected landscape changes, as well as the biological responses of organisms. Recent efforts define future potential climate refugia based on air temperatures and associated microclimatic changes. These efforts reflect the relatively strong conceptual foundation for linkages between regional climate change and local responses and thermal dynamics. Yet important questions remain. Drawing on case studies, we illustrate some key uncertainties in the responses of species and their habitats to altered hydro-climatic regimes currently not well addressed by physical or ecological models. These uncertainties need not delay anticipatory planning, but rather highlight the need for identification and communication of actions with high probabilities of success, and targeted research within an adaptive management framework.In this workshop, we will showcase the latest science on climate refugia and participants will interact through small group discussions, relevant examples, and facilitated dialogue to i

  11. A methodology for estimating health benefits of electricity generation using renewable technologies.

    PubMed

    Partridge, Ian; Gamkhar, Shama

    2012-02-01

    At Copenhagen, the developed countries agreed to provide up to $100 bn per year to finance climate change mitigation and adaptation by developing countries. Projects aimed at cutting greenhouse gas (GHG) emissions will need to be evaluated against dual criteria: from the viewpoint of the developed countries they must cut emissions of GHGs at reasonable cost, while host countries will assess their contribution to development, or simply their overall economic benefits. Co-benefits of some types of project will also be of interest to host countries: for example some projects will contribute to reducing air pollution, thus improving the health of the local population. This paper uses a simple damage function methodology to quantify some of the health co-benefits of replacing coal-fired generation with wind or small hydro in China. We estimate the monetary value of these co-benefits and find that it is probably small compared to the added costs. We have not made a full cost-benefit analysis of renewable energy in China as some likely co-benefits are omitted from our calculations. Our results are subject to considerable uncertainty however, after careful consideration of their likely accuracy and comparisons with other studies, we believe that they provide a good first cut estimate of co-benefits and are sufficiently robust to stand as a guide for policy makers. In addition to these empirical results, a key contribution made by the paper is to demonstrate a simple and reasonably accurate methodology for health benefits estimation that applies the most recent academic research in the field to the solution of an increasingly important problem. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. 77 FR 102 - Turnbull Hydro LLC; Notice of Application Accepted for Filing for Exemption for a Small Conduit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Ted Sorenson, Sorenson Engineering, 5203 South 11th East, Idaho Falls, ID 83404, (208) 522-8069; Nicholas E. Josten, GeoSense, 2742 Saint Charles Ave...

  13. Wind Energy Resource Assessment on Alaska Native Lands in Cordova Region of Prince William Sound

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whissel, John C.; Piche, Matthew

    The Native Village of Eyak (NVE) has been monitoring wind resources around Cordova, Alaska in order to determine whether there is a role for wind energy to play in the city’s energy scheme, which is now supplies entirely by two run-of-the-river hydro plants and diesel generators. These data are reported in Appendices A and B. Because the hydro resources decline during winter months, and wind resources increase, wind is perhaps an ideal counterpart to round out Cordova’s renewable energy supply. The results of this effort suggests that this is the case, and that developing wind resources makes sense for ourmore » small, isolated community.« less

  14. Development of Joint Climate and Discharge Projections for the International Rhine River Basin - the CHR RheinBlick2050 Project

    NASA Astrophysics Data System (ADS)

    Görgen, K.; Pfister, L.

    2008-12-01

    The anticipated climate change will lead to modified hydro-meteorological regimes that influence discharge behaviour and hydraulics of rivers. This has variable impacts on managed (anthropogenic) and unmanaged (natural) systems, depending on their sensitivity and vulnerability (ecology, economy, infrastructure, transport, energy production, water management, etc.). Decision makers in these contexts need adequate adaptation strategies to minimize adverse effects of climate change, i.e. an improved knowledge on the potential impacts including uncertainties means an extension of the informed options open to users. The goal of the highly applied study presented here is the development of joint, consistent climate and discharge projections for the international Rhine River catchments (Switzerland, France, Germany, Netherlands) in order to assess future changes of hydro-meteorological regimes in the meso- and macroscale Rhine River catchments and to derive and improve the understanding of such impacts on hydrologic and hydraulic processes. The RheinBlick2050 project is an international effort initiated by the International Commission for the Hydrology of the Rhine Basin (CHR) in close cooperation with the International Commission for the Protection of the Rhine. The core experiment design foresees a data-synthesis, multi-model approach where (transient) (bias- corrected) regional climate change projections are used as forcing data for existing calibrated hydrological (and hydraulic) models at a daily temporal resolution over mesoscale catchments of the Rhine River. Mainly for validation purposes, hydro-meteorological observations from national weather services are compiled into a new consistent 5 km x 5 km reference dataset from 1961 to 2005. RCM data are mainly used from the ENSEMBLES project and other existing dynamical downscaling model runs to derive probabilistic ensembles and thereby also access uncertainties on a regional scale. A benchmarking is helping to identify those atmospheric forcing data that ideally suit the needs for the subsequent hydrological model runs with the LARSIM and HBV models and evaluate those simulations too. As a result, usable information and quantifiable statements (e.g. extreme value statistics, uncertainty assessment, validation), that might form the basis for further planning or policy relevant decisions, are to be derived. Our analyses are highly influenced by the requirements of the potential users and stakeholders from government agencies who shall make use of the data and results. Here we present first results of the application of the complete data processing and modelling chain towards discharge projections on a subset of input data, albeit still without any bias correction applied to the meteorological forcing data.

  15. Definition of the Semisubmersible Floating System for Phase II of OC4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, A.; Jonkman, J.; Masciola, M.

    Phase II of the Offshore Code Comparison Collaboration Continuation (OC4) project involved modeling of a semisubmersible floating offshore wind system as shown below. This report documents the specifications of the floating system, which were needed by the OC4 participants for building aero-hydro-servo-elastic models.

  16. 76 FR 40904 - FPL Energy Maine Hydro LLC; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... turbine from 34,000 hp (25.5 MW) to 42,400 hp (31.8 MW) and its hydraulic capacity would increase from 2... application. k. Description of Application: The licensee proposes to replace the project's Unit 1 turbine... 27 MW instead of [[Page 40905

  17. Facility-Scale Solar Photovoltaic Guidebook: Bureau of Reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kiatreungwattana, Kosol; VanGeet, Otto; Stoltenberg, Blaise

    2016-09-01

    This guidebook was written for the U.S. Bureau of Reclamation to explore the use of non-hydro renewable energy resources to meet the U.S. Department of Interior's objectives and Reclamation's mission. This guidebook presents readers with the processes and steps needed to assess and successfully implement facility-scale solar projects.

  18. 76 FR 26753 - Grant Program To Assess, Evaluate and Promote Development of Tribal Energy and Mineral Resources

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ...: (720) 407-0609, e-mail: [email protected] . Conventional Energy Projects (Oil, Natural Gas, Coal..., development, feasibility and market studies. Energy includes conventional energy resources (such as oil, gas, coal, uranium, and coal bed gas) and renewable energy resources (such as wind, solar, biomass, hydro...

  19. 76 FR 15972 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... Drawing Project No. Lock+ Hydro Friends Fund XXXVIII 13744-000 FFP Missouri 12, LLC 13755-000 Allegheny 2... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  20. Acquisition of Thermal Gravimetric Analyzer and Differential Scanning Calorimeter for Enhancing Science and Engineering Education and DOD-relevant research at Miami University

    DTIC Science & Technology

    2014-11-07

    of novel papers TGA Student project; synthesis. Moringa Seed Extract for novel coagulant for water treatment Biopolymer...Reason for Use Dr. Justin Saul Keratin hydro_gel for novel adsorbent DSC Senior Design; synthesis. Education Dr. Jason Moringa Seed Extract for novel

  1. 78 FR 54641 - Lock 14 Hydro Partners; Notice of Application Accepted for Filing and Soliciting Motions to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... Partners; Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major License (5 Megawatts or less) b. Project No...

  2. 78 FR 54642 - Lock 12 Hydro Partners; Notice of Application Accepted for Filing and Soliciting Motions to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-05

    ... Partners; Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Major License (5 Megawatts or less). b. Project No...

  3. Climate impacts on hydropower and consequences for global electricity supply investment needs

    DOE PAGES

    Turner, Sean W. D.; Hejazi, Mohamad; Kim, Son H.; ...

    2017-11-15

    Climate change is projected to increase hydropower generation in some parts of the world and decrease it in others. Here we explore the possible consequences of these impacts for the electricity supply sector at the global scale. Regional hydropower projections are developed by forcing a coupled global hydrological and dam model with downscaled, bias-corrected climate realizations. Consequent impacts on power sector composition and associated emissions and investment costs are explored using the Global Change Assessment Model (GCAM). We find that climate-driven changes in hydropower generation may shift power demands onto and away from carbon intensive technologies. This then causes significantlymore » altered power sector CO 2 emissions in several hydro-dependent regions, although the net global impact is modest. For drying regions, we estimate a global, cumulative investment need of approximately one trillion dollars (±$500 billion) this century to make up for deteriorated hydropower generation caused by climate change. Total investments avoided are of a similar magnitude across regions projected to experience increased precipitation. Investment risks and opportunities are concentrated in hydro-dependent countries for which significant climate change is expected. Various countries throughout the Balkans, Latin America and Southern Africa are most vulnerable, whilst Norway, Canada, and Bhutan emerge as clear beneficiaries.« less

  4. The asymmetric impact of global warming on US drought types and distributions in a large ensemble of 97 hydro-climatic simulations.

    PubMed

    Huang, Shengzhi; Leng, Guoyong; Huang, Qiang; Xie, Yangyang; Liu, Saiyan; Meng, Erhao; Li, Pei

    2017-07-19

    Projection of future drought is often involved large uncertainties from climate models, emission scenarios as well as drought definitions. In this study, we investigate changes in future droughts in the conterminous United States based on 97 1/8 degree hydro-climate model projections. Instead of focusing on a specific drought type, we investigate changes in meteorological, agricultural, and hydrological drought as well as the concurrences. Agricultural and hydrological droughts are projected to become more frequent with increase in global mean temperature, while less meteorological drought is expected. Changes in drought intensity scale linearly with global temperature rises under RCP8.5 scenario, indicating the potential feasibility to derive future drought severity given certain global warming amount under this scenario. Changing pattern of concurrent droughts generally follows that of agricultural and hydrological droughts. Under the 1.5 °C warming target as advocated in recent Paris agreement, several hot spot regions experiencing highest droughts are identified. Extreme droughts show similar patterns but with much larger magnitude than the climatology. This study highlights the distinct response of droughts of various types to global warming and the asymmetric impact of global warming on drought distribution resulting in a much stronger influence on extreme drought than on mean drought.

  5. Climate impacts on hydropower and consequences for global electricity supply investment needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turner, Sean W. D.; Hejazi, Mohamad; Kim, Son H.

    Climate change is projected to increase hydropower generation in some parts of the world and decrease it in others. Here we explore the possible consequences of these impacts for the electricity supply sector at the global scale. Regional hydropower projections are developed by forcing a coupled global hydrological and dam model with downscaled, bias-corrected climate realizations. Consequent impacts on power sector composition and associated emissions and investment costs are explored using the Global Change Assessment Model (GCAM). We find that climate-driven changes in hydropower generation may shift power demands onto and away from carbon intensive technologies. This then causes significantlymore » altered power sector CO 2 emissions in several hydro-dependent regions, although the net global impact is modest. For drying regions, we estimate a global, cumulative investment need of approximately one trillion dollars (±$500 billion) this century to make up for deteriorated hydropower generation caused by climate change. Total investments avoided are of a similar magnitude across regions projected to experience increased precipitation. Investment risks and opportunities are concentrated in hydro-dependent countries for which significant climate change is expected. Various countries throughout the Balkans, Latin America and Southern Africa are most vulnerable, whilst Norway, Canada, and Bhutan emerge as clear beneficiaries.« less

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kitanidis, Peter

    As large-scale, commercial storage projects become operational, the problem of utilizing information from diverse sources becomes more critically important. In this project, we developed, tested, and applied an advanced joint data inversion system for CO 2 storage modeling with large data sets for use in site characterization and real-time monitoring. Emphasis was on the development of advanced and efficient computational algorithms for joint inversion of hydro-geophysical data, coupled with state-of-the-art forward process simulations. The developed system consists of (1) inversion tools using characterization data, such as 3D seismic survey (amplitude images), borehole log and core data, as well as hydraulic,more » tracer and thermal tests before CO 2 injection, (2) joint inversion tools for updating the geologic model with the distribution of rock properties, thus reducing uncertainty, using hydro-geophysical monitoring data, and (3) highly efficient algorithms for directly solving the dense or sparse linear algebra systems derived from the joint inversion. The system combines methods from stochastic analysis, fast linear algebra, and high performance computing. The developed joint inversion tools have been tested through synthetic CO 2 storage examples.« less

  7. HydroClimATe: hydrologic and climatic analysis toolkit

    USGS Publications Warehouse

    Dickinson, Jesse; Hanson, Randall T.; Predmore, Steven K.

    2014-01-01

    The potential consequences of climate variability and climate change have been identified as major issues for the sustainability and availability of the worldwide water resources. Unlike global climate change, climate variability represents deviations from the long-term state of the climate over periods of a few years to several decades. Currently, rich hydrologic time-series data are available, but the combination of data preparation and statistical methods developed by the U.S. Geological Survey as part of the Groundwater Resources Program is relatively unavailable to hydrologists and engineers who could benefit from estimates of climate variability and its effects on periodic recharge and water-resource availability. This report documents HydroClimATe, a computer program for assessing the relations between variable climatic and hydrologic time-series data. HydroClimATe was developed for a Windows operating system. The software includes statistical tools for (1) time-series preprocessing, (2) spectral analysis, (3) spatial and temporal analysis, (4) correlation analysis, and (5) projections. The time-series preprocessing tools include spline fitting, standardization using a normal or gamma distribution, and transformation by a cumulative departure. The spectral analysis tools include discrete Fourier transform, maximum entropy method, and singular spectrum analysis. The spatial and temporal analysis tool is empirical orthogonal function analysis. The correlation analysis tools are linear regression and lag correlation. The projection tools include autoregressive time-series modeling and generation of many realizations. These tools are demonstrated in four examples that use stream-flow discharge data, groundwater-level records, gridded time series of precipitation data, and the Multivariate ENSO Index.

  8. Past and predicted future changes in the land cover of the Upper Mississippi River floodplain, USA

    USGS Publications Warehouse

    De Jager, N. R.; Rohweder, J.J.; Nelson, J.C.

    2013-01-01

    This study provides one historical and two alternative future contexts for evaluating land cover modifications within the Upper Mississippi River (UMR) floodplain. Given previously documented changes in land use, river engineering, restoration efforts and hydro-climatic changes within the UMR basin and floodplain, we wanted to know which of these changes are the most important determinants of current and projected future floodplain land cover. We used Geographic Information System data covering approximately 37% of the UMR floodplain (3232 km2) for ca 1890 (pre-lock and dam) and three contemporary periods (1975, 1989 and 2000) across which river restoration actions have increased and hydro-climatic changes have occurred. We further developed two 50-year future scenarios from the spatially dependent land cover transitions that occurred from 1975 to 1989 (scenario A) and from 1989 to 2000 (scenario B) using Markov models.Land cover composition of the UMR did not change significantly from 1975 to 2000, indicating that current land cover continues to reflect historical modifications that support agricultural production and commercial navigation despite some floodplain restoration efforts and variation in river discharge. Projected future land cover composition based on scenario A was not significantly different from the land cover for 1975, 1989 or 2000 but was different from the land cover of scenario B, which was also different from all other periods. Scenario B forecasts transition of some forest and marsh habitat to open water by the year 2050 for some portions of the northern river and projects that some agricultural lands will transition to open water in the southern portion of the river. Future floodplain management and restoration planning efforts in the UMR should consider the potential consequences of continued shifts in hydro-climatic conditions that may occur as a result of climate change and the potential effects on floodplain land cover.

  9. Effects of Scandinavian hydro power on storage needs in a fully renewable European power system for various transmission capacity scenarios

    NASA Astrophysics Data System (ADS)

    Kies, Alexander; Nag, Kabitri; von Bremen, Lueder; Lorenz, Elke; Heinemann, Detlev

    2015-04-01

    The penetration of renewable energies in the European power system has increased in the last decades (23.5% share of renewables in the gross electricity consumption of the EU-28 in 2012) and is expected to increase further up to very high shares close to 100%. Planning and organizing this European energy transition towards sustainable power sources will be one of the major challenges of the 21st century. It is very likely that in a fully renewable European power system wind and photovoltaics (pv) will contribute the largest shares to the generation mix followed by hydro power. However, feed-in from wind and pv is due to the weather dependant nature of their resources fluctuating and non-controllable. To match generation and consumption several solutions and their combinations were proposed like very high backup-capacities of conventional power generation (e.g. fossile or nuclear), storages or the extension of the transmission grid. Apart from those options hydro power can be used to counterbalance fluctuating wind and pv generation to some extent. In this work we investigate the effects of hydro power from Norway and Sweden on residual storage needs in Europe depending on the overlaying grid scenario. High temporally and spatially resolved weather data with a spatial resolution of 7 x 7 km and a temporal resolution of 1 hour was used to model the feed-in from wind and pv for 34 investigated European countries for the years 2003-2012. Inflow into hydro storages and generation by run-of-river power plants were computed from ERA-Interim reanalysis runoff data at a spatial resolution of 0.75° x 0.75° and a daily temporal resolution. Power flows in a simplified transmission grid connecting the 34 European countries were modelled minimizing dissipation using a DC-flow approximation. Previous work has shown that hydro power, namely in Norway and Sweden, can reduce storage needs in a renewable European power system by a large extent. A 15% share of hydro power in Europe can reduce storage needs by up to 50% with respect to stored energy. This requires however large transmission capacities between the major hydro power producers in Scandinavia and the largest consumers of electrical energy in Western Europe. We show how Scandinavian hydro power can reduce storage needs in dependency of the transmission grid for two fully renewable scenarios: The first one has its wind and pv generation capacities distributed according to an empirically derived approach. The second scenario has an optimal spatial distribution to minimize storage needs distribution of wind and pv generation capacities across Europe. We show that in both cases hydro power together with a well developed transmission grid has the potential to contribute a large share to the solution of the generation-consumption mismatch problem. The work is part of the RESTORE 2050 project (BMBF) that investigates the requirements for cross-country grid extensions, usage of storage technologies and capacities and the development of new balancing technologies.

  10. Restoration of riparian vegetation: A global review of implementation and evaluation approaches in the international, peer-reviewed literature.

    PubMed

    González, Eduardo; Sher, Anna A; Tabacchi, Eric; Masip, Adrià; Poulin, Monique

    2015-08-01

    We examined how restoration of riparian vegetation has been implemented and evaluated in the scientific literature during the past 25 years. A total of 169 papers were read systematically to extract information about the following: 1) restoration strategies applied, 2) scale of monitoring and use of reference sites, 3) metrics used for evaluation, and 4) drivers of success. Hydro-geomorphic approaches (e.g., dam operations, controlled floods, landform reconfiguration) were the most frequent, followed by active plant introduction, exotic species control, natural floodplain conversion and grazing and herbivory control. Our review revealed noteworthy limitations in the spatio-temporal approaches chosen for evaluation. Evaluations were mostly from one single project and frequently ignored the multi-dimensional nature of rivers: landscape spatial patterns were rarely assessed, and most projects were assessed locally (i.e., ≤meander scale). Monitoring rarely lasted for more than six years and the projects evaluated were usually not more than six years old. The impact of the restoration was most often (43%) assessed by tracking change over time rather than by comparing restored sites to unrestored and reference sites (12%), and few projects (30%) did both. Among the ways which restoration success was evaluated, vegetation structure (e.g., abundance, density, etc.) was assessed more often (152 papers) than vegetation processes (e.g., biomass accumulation, survival, etc.) (112 papers) and vegetation diversity (78 papers). Success was attributed to hydro-geomorphic factors in 63% of the projects. Future evaluations would benefit from incorporating emerging concepts in ecology such as functional traits to assess recovery of functionality, more rigorous experimental designs, enhanced comparisons among projects, longer term monitoring and reporting failure. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. Homemade Electricity: An Introduction to Small-Scale Wind, Hydro, and Photovoltaic Systems.

    ERIC Educational Resources Information Center

    Smith, Diane

    This report consists of three parts. The first part provides advice (in the form of questions and answers) to prospective individual power producers who are considering investing in electricity-producing systems and in generating their own power. A list of Public Utilities Regulatory Policies Act (PURPA) regulations is included. This legislation…

  12. Estimation of crop water requirements using remote sensing for operational water resources management

    NASA Astrophysics Data System (ADS)

    Vasiliades, Lampros; Spiliotopoulos, Marios; Tzabiras, John; Loukas, Athanasios; Mylopoulos, Nikitas

    2015-06-01

    An integrated modeling system, developed in the framework of "Hydromentor" research project, is applied to evaluate crop water requirements for operational water resources management at Lake Karla watershed, Greece. The framework includes coupled components for operation of hydrotechnical projects (reservoir operation and irrigation works) and estimation of agricultural water demands at several spatial scales using remote sensing. The study area was sub-divided into irrigation zones based on land use maps derived from Landsat 5 TM images for the year 2007. Satellite-based energy balance for mapping evapotranspiration with internalized calibration (METRIC) was used to derive actual evapotranspiration (ET) and crop coefficient (ETrF) values from Landsat TM imagery. Agricultural water needs were estimated using the FAO method for each zone and each control node of the system for a number of water resources management strategies. Two operational strategies of hydro-technical project development (present situation without operation of the reservoir and future situation with the operation of the reservoir) are coupled with three water demand strategies. In total, eight (8) water management strategies are evaluated and compared. The results show that, under the existing operational water resources management strategies, the crop water requirements are quite large. However, the operation of the proposed hydro-technical projects in Lake Karla watershed coupled with water demand management measures, like improvement of existing water distribution systems, change of irrigation methods, and changes of crop cultivation could alleviate the problem and lead to sustainable and ecological use of water resources in the study area.

  13. Wind, Sun and Water: Complexities of Alternative Energy Development in Rural Northern Peru

    ERIC Educational Resources Information Center

    Love, Thomas; Garwood, Anna

    2011-01-01

    Drawing on recent research with NGO-driven projects in rural Cajamarca, Peru, we examine the paradoxes of relying on wind, solar and micro-hydro generation of electricity for rural community development. In spite of cost, vagaries of these energy resources and limited material benefits, especially with wind and solar systems, villagers are eagerly…

  14. 77 FR 10490 - FPL Energy Maine Hydro, LLC; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... the spillway at the Upper Dam development, which is part of the Upper and Middle Dam Storage Project... not constitute a major federal action significantly affecting the quality of the human environment... Commission's Web site at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding...

  15. 77 FR 38043 - Great Lakes Hydro America, LLC; Notice of Application Accepted for Filing and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... America, LLC; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and.... Deadline for filing comments, motions to intervene, and protests, is July 23, 2012. All documents may be... of your comments. Please include the project number (P-2458-198) on any comments, motions, or...

  16. Overview of the Manitou Experimental Forest Observatory: Site description and selected science results from 2008 to 2013

    Treesearch

    J. Ortega; A. Turnipseed; A. B. Guenther; T. G. Karl; D. A. Day; D. Gochis; J. A. Huffman; A. J. Prenni; E. J. T. Levin; S. M. Kreidenweis; P. J. DeMott; Y. Tobo; E. G. Patton; A. Hodzic; Y. Y. Cui; P. C. Harley; R. S. Hornbrook; E. C. Apel; R. K. Monson; A. S. D. Eller; J. P. Greenberg; M. C. Barth; P. Campuzano-Jost; B. B. Palm; J. L. Jimenez; A. C. Aiken; M. K. Dubey; C. Geron; J. Offenberg; M. G. Ryan; P. J. Fornwalt; S. C. Pryor; F. N. Keutsch; J. P. DiGangi; A. W. H. Chan; A. H. Goldstein; G. M. Wolfe; S. Kim; L. Kaser; R. Schnitzhofer; A. Hansel; C. A. Cantrell; R. L. Mauldin; J. N. Smith

    2014-01-01

    The Bio-hydro-atmosphere interactions of Energy, Aerosols, Carbon, H2O, Organics and Nitrogen (BEACHON) project seeks to understand the feedbacks and interrelationships between hydrology, biogenic emissions, carbon assimilation, aerosol properties, clouds and associated feedbacks within water-limited ecosystems. The Manitou Experimental Forest Observatory (MEFO) was...

  17. 78 FR 37212 - Portland General Electric Company; Notice of Application Accepted for Filing, Soliciting Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... install minimum flow turbine generating units. b. Project No.: 2195-088. c. Date Filed: April 10, 2013. d..., Director of Hydro Licensing and Water Rights, Portland General Electric Company, 121 SW Salmon Street... turbine facilities at four locations: 1) a powerhouse at the base of Timothy Lake Dam housing two...

  18. 75 FR 2129 - Moriah Hydro Corporation; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ...-high, containing approximately 100 pump/turbine/ generator units having a total installed capacity of...,400 acre- feet at normal water surface elevation of +1,000 feet Project Datum; (2) a lower reservoir..., with a surface area of about 50 acres and volume of approximately 2,400 acre-feet at normal water...

  19. 77 FR 2290 - Modern Hydro; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... proposed Delhi Milldam Water Power Project No. 14311 to be located at the existing Delhi Dam, on the south... three 25-foot- wide vertical sluice gates; (4) two refurbished 2,400-volt Westinghouse generator units powered by two refurbished S. Morgan Smith turbines with a combined generating capacity of 1,500 kilowatts...

  20. Geovisualization in the HydroProg web map service

    NASA Astrophysics Data System (ADS)

    Spallek, Waldemar; Wieczorek, Malgorzata; Szymanowski, Mariusz; Niedzielski, Tomasz; Swierczynska, Malgorzata

    2016-04-01

    The HydroProg system, built at the University of Wroclaw (Poland) in frame of the research project no. 2011/01/D/ST10/04171 financed by the National Science Centre of Poland, has been designed for computing predictions of river stages in real time on a basis of multimodelling. This experimental system works on the upper Nysa Klodzka basin (SW Poland) above the gauge in the town of Bardo, with the catchment area of 1744 square kilometres. The system operates in association with the Local System for Flood Monitoring of Klodzko County (LSOP), and produces hydrograph prognoses as well as inundation predictions. For presenting the up-to-date predictions and their statistics in the online mode, the dedicated real-time web map service has been designed. Geovisualisation in the HydroProg map service concerns: interactive maps of study area, interactive spaghetti hydrograms of water level forecasts along with observed river stages, animated images of inundation. The LSOP network offers a high spatial and temporal resolution of observations, as the length of the sampling interval is equal to 15 minutes. The main environmental elements related to hydrological modelling are shown on the main map. This includes elevation data (hillshading and hypsometric tints), rivers and reservoirs as well as catchment boundaries. Furthermore, we added main towns, roads as well as political and administrative boundaries for better map understanding. The web map was designed as a multi-scale representation, with levels of detail and zooming according to scales: 1:100 000, 1:250 000 and 1:500 000. Observations of water level in LSOP are shown on interactive hydrographs for each gauge. Additionally, predictions and some of their statistical characteristics (like prediction errors and Nash-Sutcliffe efficiency) are shown for selected gauges. Finally, predictions of inundation are presented on animated maps which have been added for four experimental sites. The HydroProg system is a strictly scientific project, but the web map service has been designed for all web users. The main objective of the paper is to present the design process of the web map service, following the cartographic and graphic principles.

  1. Global analysis of a renewable micro hydro power generation plant

    NASA Astrophysics Data System (ADS)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  2. Blade number impact on pressure and performance of archimedes screw turbine using CFD

    NASA Astrophysics Data System (ADS)

    Maulana, Muhammad Ilham; Syuhada, Ahmad; Nawawi, Muhammad

    2018-02-01

    Many rivers in Indonesia can be used as source of mini/micro hydro power plant using low head turbine. The most suitable type of turbine used in fluid flow with low head is the Archimedes screw turbine. The Archimedes screw hydro turbine is a relative newcomer to the small-scale hydropower that can work efficiently on heads as low as 10 meter. In this study, the performance of Archimedes water turbines that has different blade numbers that are thoroughly evaluated to obtain proper blade configuration. For this purpose, numerical simulations are used to predict the pressure changes that occur along the turbine. The simulation results show that turbines with an amount of two blades have more sloping pressure distribution so that it has better stability.

  3. Prediflood: A French research project aiming at developing a road submersion warning system for flash flood prone areas

    NASA Astrophysics Data System (ADS)

    Naulin, J. P.; Payrastre, O.; Gaume, E.; Delrieu, G.; Arnaud, P.; Lutoff, C.; Vincendon, B.

    2010-09-01

    Accurate flood forecasts are crucial for an efficient flood event management. Until now, hydro-meteorological forecasts have been mainly used for early-warnings in France (Meteorological and flood vigilance maps) or over the world (Flash-flood guidances). Forecasts are also often limited to the main streams or to specific watersheds with particular assets like hydropower dams, leaving aside large parts of the territory. Distributed hydro-meteorological forecasting models, able to take advantage of the now available high spatial and temporal resolution rainfall measurements, are promising tools for anticipating and quantifying the short term consequences of storm events all over a region. They would be very useful, especially in regions frequently affected by severe storms with complex spatio-temporal patterns. They would provide the necessary information for flood event management services to identify the areas at risk and to take the appropriate safety and rescue measures: prepositioning of rescue means, stopping of the traffic on exposed roads, determination of safe accesses or evacuation routes. Some preliminary tests conducted by the LCPC within the European project FLOODsite have shown encouraging results of a distributed hydro-meteorological forecasting model. It seems possible, despite the limits of the available rainfall measurements and the shortcomings of the rainfall-runoff models, to deliver distributed forecasts of possible local flood consequences - road submersion risk rating at about 5000 different locations over the Gard department in the tested case - with an acceptable level of accuracy. The PreDiFlood project (http://heberge.lcpc.fr/prediflood/) aims at consolidating and extending these first results with the objective to conduct pre-operational tests with possible end-users at the end of the project. Such a tool will not replace, but complement existing flood forecasting approaches in time and space domains that have not been covered until now (short term forecasting at a regional scale). It will produce a completely new type of forecasts and the usefulness of such data for the emergency services for their real-time decision making will be assessed within the project. Beyond the direct operational objectives, this project aims at demonstrating, on a specific application (the now-casting of road submersions), the possibilities and also the limits and hence the needed improvements of tools that are still underused: radar quantitative precipitation estimates but also precipitation now-castings, distributed rainfall-runoff models, and the recent knowledge acquired on flash-floods consequence evaluation as well as event management.

  4. 75 FR 17706 - FPL Energy Maine Hydro LLC, Complainant v. Great Lakes Hydro America LLC Rumford Falls Hydro LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-53-000] FPL Energy Maine Hydro LLC, Complainant v. Great Lakes Hydro America LLC Rumford Falls Hydro LLC, Respondents; Notice of Complaint March 29, 2010. Take notice that on March 26, 2010, pursuant to section 206 of the Federal Energy Regulatory Commission's (Commission...

  5. Efficient and accurate numerical schemes for a hydro-dynamically coupled phase field diblock copolymer model

    NASA Astrophysics Data System (ADS)

    Cheng, Qing; Yang, Xiaofeng; Shen, Jie

    2017-07-01

    In this paper, we consider numerical approximations of a hydro-dynamically coupled phase field diblock copolymer model, in which the free energy contains a kinetic potential, a gradient entropy, a Ginzburg-Landau double well potential, and a long range nonlocal type potential. We develop a set of second order time marching schemes for this system using the "Invariant Energy Quadratization" approach for the double well potential, the projection method for the Navier-Stokes equation, and a subtle implicit-explicit treatment for the stress and convective term. The resulting schemes are linear and lead to symmetric positive definite systems at each time step, thus they can be efficiently solved. We further prove that these schemes are unconditionally energy stable. Various numerical experiments are performed to validate the accuracy and energy stability of the proposed schemes.

  6. Hydroelectric System Response to Part Load Vortex Rope Excitation

    NASA Astrophysics Data System (ADS)

    Alligné, S.; Nicolet, C.; Bégum, A.; Landry, C.; Gomes, J.; Avellan, F.

    2016-11-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope on the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of v = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed to analyse potential interactions between hydraulic excitation sources and electrical components.

  7. Climate Change Impact Assessment of Hydro-Climate in Southern Peninsular Malaysia

    NASA Astrophysics Data System (ADS)

    Ercan, A.; Ishida, K.; Kavvas, M. L.; Chen, Z. R.; Jang, S.; Amin, M. Z. M.; Shaaban, A. J.

    2017-12-01

    Impacts of climate change on the hydroclimate of the coastal region in the south of Peninsular Malaysia in the 21st century was assessed by means of a regional climate model utilizing an ensemble of 15 different future climate realizations. Coarse resolution Global Climate Models' future projections covering four emission scenarios based on Coupled Model Intercomparison Project phase 3 (CMIP3) datasets were dynamically downscaled to 6 km resolution over the study area. The analyses were made in terms of rainfall, air temperature, evapotranporation, and soil water storage.

  8. Introducing the CUAHSI Hydrologic Information System Desktop Application (HydroDesktop) and Open Development Community

    NASA Astrophysics Data System (ADS)

    Ames, D.; Kadlec, J.; Horsburgh, J. S.; Maidment, D. R.

    2009-12-01

    The Consortium of Universities for the Advancement of Hydrologic Sciences (CUAHSI) Hydrologic Information System (HIS) project includes extensive development of data storage and delivery tools and standards including WaterML (a language for sharing hydrologic data sets via web services); and HIS Server (a software tool set for delivering WaterML from a server); These and other CUASHI HIS tools have been under development and deployment for several years and together, present a relatively complete software “stack” to support the consistent storage and delivery of hydrologic and other environmental observation data. This presentation describes the development of a new HIS software tool called “HydroDesktop” and the development of an online open source software development community to update and maintain the software. HydroDesktop is a local (i.e. not server-based) client side software tool that ultimately will run on multiple operating systems and will provide a highly usable level of access to HIS services. The software provides many key capabilities including data query, map-based visualization, data download, local data maintenance, editing, graphing, data export to selected model-specific data formats, linkage with integrated modeling systems such as OpenMI, and ultimately upload to HIS servers from the local desktop software. As the software is presently in the early stages of development, this presentation will focus on design approach and paradigm and is viewed as an opportunity to encourage participation in the open development community. Indeed, recognizing the value of community based code development as a means of ensuring end-user adoption, this project has adopted an “iterative” or “spiral” software development approach which will be described in this presentation.

  9. Mapping the Decadal Spatio-temporal Variation of Social Vulnerability to Hydro-climatic Extremes over India

    NASA Astrophysics Data System (ADS)

    H, V.; Karmakar, S.; Ghosh, S.

    2015-12-01

    Human induced global warming is unequivocal and observational studies shows that, this has led to increase in the intensity and frequency of hydro-climatic extremes, most importantly precipitation extreme, heat waves and drought; and also is expected to be increased in the future. The occurrence of these extremes have a devastating effects on nation's economy and on societal well-being. Previous studies on India provided the evidences of significant changes in the precipitation extreme from pre- to post-1950, with huge spatial heterogeneity; and projections of heat waves indicated that significant part of India will experience heat stress conditions in the future. Under these circumstance, it is necessary to develop a nation-wide social vulnerability map to scrutinize the adequacy of existing emergency management. Yet there has been no systematic past efforts on mapping social vulnerability to hydro-climatic extremes at nation-wide for India. Therefore, immediate efforts are required to quantify the social vulnerability, particularly developing country like India, where major transformations in demographic characteristics and development patterns are evident during past decades. In the present study, we perform a comprehensive spatio-temporal social vulnerability analysis by considering multiple sensitive indicators for three decades (1990-2010) which identifies the hot-spots, with higher vulnerability to hydro-climatic extremes. The population datasets are procured from Census of India and the meteorological datasets are obtained from India Meteorological Department (IMD). The study derives interesting results on decadal changes of spatial distribution of risk, considering social vulnerability and hazard to extremes.

  10. A hydro-meteorological model chain to assess the influence of natural variability and impacts of climate change on extreme events and propose optimal water management

    NASA Astrophysics Data System (ADS)

    von Trentini, F.; Willkofer, F.; Wood, R. R.; Schmid, F. J.; Ludwig, R.

    2017-12-01

    The ClimEx project (Climate change and hydrological extreme events - risks and perspectives for water management in Bavaria and Québec) focuses on the effects of climate change on hydro-meteorological extreme events and their implications for water management in Bavaria and Québec. Therefore, a hydro-meteorological model chain is applied. It employs high performance computing capacity of the Leibniz Supercomputing Centre facility SuperMUC to dynamically downscale 50 members of the Global Circulation Model CanESM2 over European and Eastern North American domains using the Canadian Regional Climate Model (RCM) CRCM5. Over Europe, the unique single model ensemble is conjointly analyzed with the latest information provided through the CORDEX-initiative, to better assess the influence of natural climate variability and climatic change in the dynamics of extreme events. Furthermore, these 50 members of a single RCM will enhance extreme value statistics (extreme return periods) by exploiting the available 1500 model years for the reference period from 1981 to 2010. Hence, the RCM output is applied to drive the process based, fully distributed, and deterministic hydrological model WaSiM in high temporal (3h) and spatial (500m) resolution. WaSiM and the large ensemble are further used to derive a variety of hydro-meteorological patterns leading to severe flood events. A tool for virtual perfect prediction shall provide a combination of optimal lead time and management strategy to mitigate certain flood events following these patterns.

  11. The asymmetric impact of global warming on US drought types and distributions in a large ensemble of 97 hydro-climatic simulations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huang, Shengzhi; Leng, Guoyong; Huang, Qiang

    Projection of future drought is often involved large uncertainties from climate models, emission scenarios as well as drought definitions. In this study, we investigate changes in future droughts in the conterminous United States based on 97 1/8 degree hydro-climate model projections. Instead of focusing on a specific drought type, we investigate changes in meteorological, agricultural, and hydrological drought as well as the concurrences. Agricultural and hydrological droughts are projected to become more frequent with increase in global mean temperature, while less meteorological drought is expected. Changes in drought intensity scale linearly with global temperature rises under RCP8.5 scenario, indicating themore » potential feasibility to derive future drought severity given certain global warming amount under this scenario. Changing pattern of concurrent droughts generally follows that of agricultural and hydrological droughts. Under the 1.5 °C warming target as advocated in recent Paris agreement, several hot spot regions experiencing highest droughts are identified. Extreme droughts show similar patterns but with much larger magnitude than the climatology. In conclusion, this study highlights the distinct response of droughts of various types to global warming and the asymmetric impact of global warming on drought distribution resulting in a much stronger influence on extreme drought than on mean drought.« less

  12. The asymmetric impact of global warming on US drought types and distributions in a large ensemble of 97 hydro-climatic simulations

    DOE PAGES

    Huang, Shengzhi; Leng, Guoyong; Huang, Qiang; ...

    2017-07-19

    Projection of future drought is often involved large uncertainties from climate models, emission scenarios as well as drought definitions. In this study, we investigate changes in future droughts in the conterminous United States based on 97 1/8 degree hydro-climate model projections. Instead of focusing on a specific drought type, we investigate changes in meteorological, agricultural, and hydrological drought as well as the concurrences. Agricultural and hydrological droughts are projected to become more frequent with increase in global mean temperature, while less meteorological drought is expected. Changes in drought intensity scale linearly with global temperature rises under RCP8.5 scenario, indicating themore » potential feasibility to derive future drought severity given certain global warming amount under this scenario. Changing pattern of concurrent droughts generally follows that of agricultural and hydrological droughts. Under the 1.5 °C warming target as advocated in recent Paris agreement, several hot spot regions experiencing highest droughts are identified. Extreme droughts show similar patterns but with much larger magnitude than the climatology. In conclusion, this study highlights the distinct response of droughts of various types to global warming and the asymmetric impact of global warming on drought distribution resulting in a much stronger influence on extreme drought than on mean drought.« less

  13. Inter-comparison of hydro-climatic regimes across northern catchments: snychronicity, resistance and resilience

    Treesearch

    Sean K. Carey; Doerthe Tetzlaff; Jan Seibert; Chris Soulsby; Jim Buttle; Hjalmar Laudon; Jeff McDonnell; Kevin McGuire; Daniel Caissie; Jamie Shanley; Mike Kennedy; Kevin Devito; John W. Pomeroy

    2010-01-01

    The higher mid-latitudes of the Northern Hemisphere are particularly sensitive to climate change as small differences in temperature determine frozen ground status, precipitation phase, and the magnitude and timing of snow accumulation and melt. An international inter-catchment comparison program, North-Watch, seeks to improve our understanding of the sensitivity of...

  14. Hydro-Geomorphic Connectivity in Arid Watershed: Anthropogenic Effects and Extreme Flash flood

    NASA Astrophysics Data System (ADS)

    Egozi, Roey

    2017-04-01

    Arid watersheds are excellent settings to study water and sediment connectivity because of spars vegetation and the possibility to make clearer links between climate parameters and topographical changes. However different flood event magnitudes may result in different degrees of connectivity. This even gets more complicated when man made modifications to the drainage system are done without considering the outcomes in terms of the potential of flood damage and risks, i.e. in the case of extreme flash floods. Herein we report on the results from two studies conducted in two different small catchments along the dead sea rift: Wadi A Dalia and Wadi Ras Moakif. The studies conducted as part of a larger project aimed at investigating the floods and damages triggered by a rare storm event occurred at the end of October 2015. This storm event covered all of Israel and characterized with rare rainfall depths and intensities as well as floods with rare pick discharges. Observations and field measurements of bed material, river cross sections and water elevation markers were done and statistical analysis has been performed to estimate the exceed probability of the different measured and estimated hydro-climatic values. In Wadi-A-Dalia the coupling of rare rainfall depths over the watershed area which itself was bare due to over grazing result in a major flood. The severe damage caused by this flood was intensified due to the increase of structural hydrologic connectivity, i.e. flood protection canal discharged higher volumes of water collected from small Wadi systems at the same time. In Wadi Ras Moakif the rainfall cells did not produced rare rainfall, but still a major flood occurred over a very short distance of the main channel transporting huge amount of bed material deposited and blocked the main road along the dead sea western coast. In this case the cause was similar - a modification to the drainage system result in increase structural hydrologic connectivity lead to runoff concentration and higher stream power value. The results suggest that in arid watersheds flood protection measures that involve modifications to the drainage system such that the structural hydrologic connectivity improves with the aim to conduit the volume of water away may fail to provide the protection planned and may cause higher damage to infrastructures. Therefore, hydrologic connectivity should become a parameter in flood control design. Moreover, studying hydrologic connectivity in natural landscapes may provide valid solutions for flood control design projects.

  15. 77 FR 26796 - HydroGenetics, Inc.; Order of Suspension of Trading

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-07

    ... SECURITIES AND EXCHANGE COMMISSION [File No. 500-1] HydroGenetics, Inc.; Order of Suspension of... and accurate information concerning the securities of HydroGenetics, Inc. (``HydroGenetics'') because... require a suspension of trading in the securities of HydroGenetics. Therefore, it is ordered, pursuant to...

  16. Projects in eastern Canada encounter strong opposition. [Hydroelectric power plants planned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carr, F.H.

    1993-09-13

    At the end of August, Quebec's provincial utility submitted a long-awaited environmental impact statement on its proposed Great Whale project near Hudson Bay. It faces opposition, as does a big project planned in Labrador. Hydro-Quebec's EIS says its $10-billion, 3,210-Mw project [open quotes]would have impacts that are generally moderate and localized, and that can be mitigated,[close quotes] according to a utility spokeswoman. But environmental and Native American groups opposed to the project say its three powerhouses on the Great Whale River and 600 sq miles of new impoundments would destroy hunting and fishing areas and mar the environment. Five federalmore » and provincial review panels will determine over the next several weeks if the EIS meets their requirements.« less

  17. 75 FR 73062 - Qualified Hydro 27, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... (Howard A. Hanson project) to be located in King County, Washington, near the town of Palmer. The sole... 675-foot-long, 235-foot-high earth and rockfill Howard A. Hanson dam; (2) the existing Howard A. Hanson reservoir, which has a maximum usable storage of 106,000 acre-feet between elevation 1,206 feet...

  18. 77 FR 73651 - North Star Hydro Services, CA LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...), proposing to study the feasibility of the Marble Bluff Dam Hydropower Project to be located at the U.S. Bureau of Reclamation's Marble Bluff dam on the Truckee River, near Nixon, Washoe County, Nevada. The... east of the existing spillway of the Marble Bluff dam. Flow diverted at the sluice gate would be used...

  19. 75 FR 1049 - Public Utility District No. 1 of Snohomish County, WA; Notice of Intent To File License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... Tidal Project would consist of (1) two 10-meter, 500-kilowatt (kW) Open-Centre Turbines supplied by OpenHydro Group Ltd., mounted on completely submerged gravity foundations; (2) two 250-meter service cables... cable termination vault about 50 meters from shore; (3) two 81-meter-long buried conduits containing the...

  20. 76 FR 73614 - Lock 14 Hydro Partners; FFP Project 106 LLC; Notice of Competing Preliminary Permit Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of a... directed by the Corps. Applicant Contact: Mr. David Brown Kinloch, Soft Energy Associates, 414 S. Wenzel... Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283-2822. FERC...

  1. 76 FR 73616 - Lock 12 Hydro Partners; FFP Project 107 LLC; Notice of Competing Preliminary Permit Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of a... Lock and Dam No. 12, as directed by the Corps. Applicant Contact: Mr. David Brown Kinloch, Soft Energy.... Ramya Swaminathan, Free Flow Power Corp., 239 Causeway Street, Suite 300, Boston, MA 02114. (978) 283...

  2. 78 FR 57375 - Toutant Hydro Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc.gov/docs-filing... Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License, and Soliciting Comments... System, LLC (transferee) filed an application for transfer of license for the M.S.C. Power Project, FERC...

  3. 75 FR 69425 - Qualified Hydro 30, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... vertical Kaplan turbine-generator units with a combined capacity of 2.5 megawatts; (5) a new 3-MVA.../ferconline.asp ) under the ``eFiling'' link. For a simpler method of submitting text only comments, click on... this project, including a copy of the application can be viewed or printed on the ``eLibrary'' link of...

  4. 76 FR 11240 - Qualified Hydro 34, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ... and would consist of the following: (1) One vertical Kaplan turbine and generator unit rated at 25... characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment... information about this project, including a copy of the application, can be viewed or printed on the ``e...

  5. 75 FR 70224 - Qualified Hydro 29, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...-foot diameter penstock; (4) two vertical Kaplan turbine-generator units with a combined capacity of 7.0... ) under the ``eFiling'' link. For a simpler method of submitting text only comments, click on ``Quick... project, including a copy of the application can be viewed or printed on the ``eLibrary'' link of...

  6. 75 FR 71429 - Qualified Hydro 33, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    .... The proposed project will consist of the following: (1) One vertical Kaplan turbine-generator with a... to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov... printed on the ``eLibrary'' link of the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary...

  7. 75 FR 69426 - Qualified Hydro 31, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... penstock; (4) two vertical Kaplan turbine- generator units with a combined capacity of 3.5 megawatts; (5) a.../ferconline.asp ) under the ``eFiling'' link. For a simpler method of submitting text only comments, click on... this project, including a copy of the application can be viewed or printed on the ``eLibrary'' link of...

  8. 75 FR 73066 - Qualified Hydro 35, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    .... The proposed project would consist of the following: (1) Two vertical Kaplan turbine-generators with a... brief comments up to 6,000 characters, without prior registration, using the eComment system at http... or printed on the ``eLibrary'' link of the Commission's Web site at http://www.ferc.gov/docs-filing...

  9. 77 FR 31843 - Swan Lake North Hydro, LLC; Notice of Preliminary Permit Application Accepted For Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... California; and (14) appurtenant facilities. The project would be a closed-loop system using groundwater and... application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA... power tunnel; (6) a 30-foot-diameter, 1,200-foot-long vertical shaft; (7) a 30-foot-diameter, 1,000-foot...

  10. 75 FR 13527 - Muskingum Valley Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... the feasibility of the Paint Creek Dam Project No. 13633, to be located at the existing Paint Creek Dam on Paint Creek, in Highland County, Ohio. The Paint Creek Dam is owned and operated by the U.S.... Applicant Contact: Randall Smith, 4950 Frazeysburg Road, Zanesville, OH 43701, (740) 891-5424. [[Page 13528...

  11. 76 FR 70434 - Shelbyville Hydro LLC; Notice of Application Tendered for Filing With the Commission and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with... as flow regimens and pool levels are set forth by the Corps. The project would generate power using flows between 130 cfs (cubic feet per second) to 1,500 cfs. When flows are below 130 cfs, all flows...

  12. High-resolution ensemble projections of near-term regional climate over the continental United States

    DOE PAGES

    Ashfaq, Moetasim; Rastogi, Deeksha; Mei, Rui; ...

    2016-09-01

    We present high-resolution near-term ensemble projections of hydro-climatic changes over the contiguous U.S. using a regional climate model (RegCM4) that dynamically downscales 11 Global Climate Models from the 5th phase of Coupled Model Inter-comparison Project at 18km horizontal grid spacing. All model integrations span 41 years in the historical period (1965 – 2005) and 41 years in the near-term future period (2010 – 2050) under Representative Concentration Pathway 8.5 and cover a domain that includes the contiguous U.S. and parts of Canada and Mexico. Should emissions continue to rise, surface temperatures in every region within the U.S. will reach amore » new climate norm well before mid 21st century regardless of the magnitudes of regional warming. Significant warming will likely intensify the regional hydrological cycle through the acceleration of the historical trends in cold, warm and wet extremes. The future temperature response will be partly regulated by changes in snow hydrology over the regions that historically receive a major portion of cold season precipitation in the form of snow. Our results indicate the existence of the Clausius-Clapeyron scaling at regional scales where per degree centigrade rise in surface temperature will lead to a 7.4% increase in precipitation from extremes. More importantly, both winter (snow) and summer (liquid) extremes are projected to increase across the U.S. These changes in precipitation characteristics will be driven by a shift towards shorter and wetter seasons. Altogether, projected changes in the regional hydro-climate can have substantial impacts on the natural and human systems across the U.S.« less

  13. Liberian energy consumption and sectoral distribution for 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Samuels, G.

    1985-02-01

    This report is one of a series of project papers providing background information for an assessment of energy options for Liberia, West Africa; it summarizes 1981 Liberian energy consumption data collected during 1982. Total Liberian primary energy consumption in 1981 was equivalent to 11,400,000 barrels of crude oil (BCOE) - 64% from wood, 31% from petroleum, and 5% from hydro. About 71% (8,100,000 BCOE) entered the domestic market. The difference represents exports (400,000 BCOE), refining losses (200,000 BCOE), and losses in converting wood to charcoal (2,600,000 BCOE). Of the 8,100,000 BCOE entering the domestic market, 58% was in the formmore » of wood and charcoal, 35% petroleum products, and 7% hydro. Excluding wood and charcoal, electricity generation consumed 59% of the energy entering the domestic market. The three iron ore mining companies accounted for 60% of all electricity production; the Liberia Electricity Corporation for 35%, and private organizations and individuals for 5%. The mining operations (including electricity generation and transportation uses) consumed about 60% of all petroleum products. The transportation sector consumed 30% of all petroleum of which 85% was for road transport, 12% for the railroads owned and operated by the mining companies, and 3% for sea and air transport. Nontransportation energy use in the industrial, commercial, government, and agriculture and forestry sectors is small. Together, these sectors account for less than 10% of the petroleum products consumed. Wood and charcoal were used almost entirely by the residential sector, which also consumed an additional 530,000 BCOE of other fuels. Over 90% of the 530,000 BCOE was for electricity and 290,000 (56%) was from petroleum. Over half of the petroleum (150,000 BCOE) was for generation at the mines for their associated communities. 8 references, 10 tables.« less

  14. Rainfall and snow-melt triggered glacial lake outbursts: a systematic analysis of the Kedarnath (Uttarakhand, India), June 2013 disaster

    NASA Astrophysics Data System (ADS)

    Allen, Simon; Rastner, Philipp; Arora, Manohar; Huggel, Christian; Stoffel, Markus

    2015-04-01

    Heavy rainfall in early June 2013 triggered flash flooding and landslides throughout the Indian Himalayan state of Uttarakhand, killing more than 6000 people. The destruction of roads and trekking routes left around 100,000 pilgrims and tourists stranded. Most fatalities and damages resulted directly from a lake outburst and debris flow disaster originating from above the village of Kedarnath on June 16 and 17. Here we provide a first systematic analysis of the contributing factors leading to the Kedarnath disaster, both in terms of hydro-meteorological triggering (rainfall, snowmelt, and temperature) and topographic predisposition. Specifically, the topographic characteristics of the Charobari lake watershed above Kedarnath are compared with other glacial lakes across the northwestern Indian Himalayan states of Uttarakhand and Himachal Pradesh, and implications for glacier lake outburst hazard assessment in a changing climate are discussed. Our analysis suggests that the early onset of heavy monsoon rainfall (390 mm, June 10 - 17) immediately following a prolonged four week period of unusually rapid snow cover depletion and elevated streamflow is the crucial hydro-meteorological factor, resulting in slope saturation and significant runoff into the small seasonal glacial lake. Over a four week period the MODIS-derived snow covered area above Kedarnath decreased nearly 50%, from above average coverage in mid-May to well below average coverage by the second week of June. Such a rapid decrease has not been observed in the previous 13-year record, where the average decrease in snow covered area over the same four week window is only 15%. The unusual situation of the lake being dammed in a steep, unstable paraglacial environment, but fed entirely from snow-melt and rainfall within a fluvial dominated watershed is important in the context of this disaster. A simple scheme enabling large-scale recognition of such an unfavorable topographic setting is presented, and on the basis of all assessed watershed parameters, the situation at Charobari lake indicates an anomalous predisposition towards rapid runoff and infilling during enhanced snowmelt or heavy rainfall. In view of projected 21st century changes in monsoon timing and heavy precipitation in South Asia, more emphasis should be given to potential hydro-meteorological triggering of lake outburst and related debris flow disasters in the Himalayas. The potential for Kedarnath-type lake breaching may further increase as glaciers recede or ultimately disappear, and watersheds become increasingly rainfall dominated. Hence, a long-term perspective to glacier lake outburst hazard assessment and management is required, as the greatest threat from hydro-meteorological triggering of related disasters may only be realized in an ice-free environment.

  15. 75 FR 49925 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    .... 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice of Competing Preliminary Permit... August 9, 2010. Lock+ Hydro Friends Fund XLIX (Hydro Friends) and FFP Missouri 14, LLC (FFP) filed...-station located south-west of the dam. Hydro Friends is also exploring alternatives that would locate the...

  16. Continental-scale assessment of long-term trends in wet deposition trajectories: Role of anthropogenic and hydro-climatic drivers

    NASA Astrophysics Data System (ADS)

    Park, J.; Gall, H. E.; Niyogi, D.; Rao, S.

    2012-12-01

    The global trend of increased urbanization, and associated increased intensity of energy and material consumption and waste emissions, has contributed to shifts in the trajectories of aquatic, terrestrial, and atmospheric environments. Here, we focus on continental-scale spatiotemporal patterns in two atmospheric constituents (nitrate and sulfate), whose global biogeochemical cycles have been dramatically altered by emissions from mobile and fixed sources in urbanized and industrialized regions. The observed patterns in wet deposition fluxes of nitrate and sulfate are controlled by (1) natural hydro-climatic forcing, and (2) anthropogenic forcing (emissions and regulatory control), both of which are characterized by stochasticity and non-stationarity. We examine long-term wet deposition records in the U.S., Europe, and East Asia to evaluate how anthropogenic and natural forcing factors jointly contributed to the shifting temporal patterns of wet deposition fluxes at continental scales. These data offer clear evidence for successful implementation of regulatory controls and widespread adoption of technologies contributed to improving water quality and mitigation of adverse ecological impacts. We developed a stochastic model to project the future trajectories of wet deposition fluxes in emerging countries with fast growing urban areas. The model generates ellipses within which projected wet deposition flux trajectories are inscribed, similar to the trends in observational data. The shape of the ellipses provides information regarding the relative dominance of anthropogenic (e.g., industrial and urban emissions) versus hydro-climatic drivers (e.g., rainfall patterns, aridity index). Our analysis facilitates projections of the trajectory shift as a result of urbanization and other land-use changes, climate change, and regulatory enforcement. We use these observed data and the model to project likely trajectories for rapidly developing countries (BRIC), with a particular emphasis on various approaches to sustainable economic development. Brazil represents the case of shifts to alternate energy sources (bioethanol and hydroelectric power), while India and China are on the fossil fuel dependent trajectories, the same that North America and Europe had followed. Rapid increases in population, urbanization, and economic development of African cities presents an interesting case study for choices available for sustainable development, similar to that of Brazil rather than that followed by India and China. Coordinated air quality monitoring at urban and reference sites needs to be established to follow the fast-changing conditions.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gorlov, A.M.

    This report contains conclusive results of the research project entitled ``Further Development of the Pneumatic Method to Harness Hydropower and its Experimental Implementation in the State of Maine`` sponsored by the US Department of Energy (Contract DE-FG02-91ER12113). The results obtained by this research are considerably beyond the original goals anticipated by the contract which were a theoretical study of the method only and its possible applications. In fact, the success of the analytical research program has allowed us to move on to development, construction and testing of a physical model of the hydro-air power converter and, subsequently, to development ofmore » a well equipped hydro-pneumatic power laboratory at Northeastern University. Photographs la and 2a show both the laboratory and the model. Good performance of the model proves that the hydro-pneumatic concept holds much promise for development of an ecologically safe and commercially attractive novel approach to harnessing ultra low-head hydropower. As a result, private companies have started to support this new technology, and to invest money in its further development and construction of demonstration power plants (Appendix 1). Visitors at the Northeastern University laboratory often praise this new technique, as is attested by the articles in the Wall Street Journal (Appendix 2) and the Technology Review (Appendix 3).« less

  18. Spatiotemporal analysis of hydro-meteorological drought in the Johor River Basin, Malaysia

    NASA Astrophysics Data System (ADS)

    Tan, Mou Leong; Chua, Vivien P.; Li, Cheng; Brindha, K.

    2018-02-01

    Assessment of historical hydro-meteorological drought is important to develop a robust drought monitoring and prediction system. This study aims to assess the historical hydro-meteorological drought of the Johor River Basin (JRB) from 1975 to 2010, an important basin for the population of southern Peninsular Malaysia and Singapore. The Standardized Precipitation Index (SPI) and Standardized Streamflow Index (SSI) were selected to represent the meteorological and hydrological droughts, respectively. Four absolute homogeneity tests were used to assess the rainfall data from 20 stations, and two stations were flagged by these tests. Results indicate the SPI duration to be comparatively low (3 months), and drier conditions occur over the upper JRB. The annual SSI had a strong decreasing trend at 95% significance level, showing that human activities such as reservoir construction and agriculture (oil palm) have a major influence on streamflow in the middle and lower basin. In addition, moderate response rate of SSI to SPI was found, indicating that hydrological drought could also have occurred in normal climate condition. Generally, the El Niño-Southern Oscillation and Madden Julian Oscillation have greater impacts on drought events in the basin. Findings of this study could be beneficial for future drought projection and water resources management.

  19. 78 FR 57796 - Safety Zone; Pro Hydro-X Tour, Atlantic Ocean, Islamorada, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-20

    ... 1625-AA00 Safety Zone; Pro Hydro-X Tour, Atlantic Ocean, Islamorada, FL AGENCY: Coast Guard, DHS... waters of the Atlantic Ocean, Islamorada, Florida during the Pro Hydro- X Tour. The Pro Hydro-X Tour is a... course for each race. The Pro Hydro-X Tour is scheduled to take place on September 20, 21, and 22, 2013...

  20. Thermo-hydro-mechanical-chemical processes in fractured-porous media: Benchmarks and examples

    NASA Astrophysics Data System (ADS)

    Kolditz, O.; Shao, H.; Görke, U.; Kalbacher, T.; Bauer, S.; McDermott, C. I.; Wang, W.

    2012-12-01

    The book comprises an assembly of benchmarks and examples for porous media mechanics collected over the last twenty years. Analysis of thermo-hydro-mechanical-chemical (THMC) processes is essential to many applications in environmental engineering, such as geological waste deposition, geothermal energy utilisation, carbon capture and storage, water resources management, hydrology, even climate change. In order to assess the feasibility as well as the safety of geotechnical applications, process-based modelling is the only tool to put numbers, i.e. to quantify future scenarios. This charges a huge responsibility concerning the reliability of computational tools. Benchmarking is an appropriate methodology to verify the quality of modelling tools based on best practices. Moreover, benchmarking and code comparison foster community efforts. The benchmark book is part of the OpenGeoSys initiative - an open source project to share knowledge and experience in environmental analysis and scientific computation.

  1. Improved non-LTE simulation algorithm

    NASA Astrophysics Data System (ADS)

    Busquet, Michel; Klapisch, Marcel; Colombant, Denis; Fyfe, David; Gardner, John

    2008-11-01

    The RAdiation Dependent Ionization Model (RADIOM)- a.k.a Busquet's model-[1] has proven its success in simulating non --LTE effects in laser fusion plasmas [2]. This improved algorithm can take into account Auger effect by a new parameter fitted to SCROLL [3] results. It is independent of the photon binning thanks to a projection on a standard grid. It guarantees smoother convergence to LTE. This algorithm has been implemented in a new way in the hydro-code FASTnD. Hydro simulations on the recent subMJ targets[4], with and without non-LTE corrections will be shown. [1] M. Busquet, Phys. Fluids B 5, 4191(1993). [2] D.G. Colombant et al, Phys. Plas. 7,2046 (2000). [3] A. Bar-Shalom, J. Oreg M. Klapisch, J. Quant. Spectr. Rad. Transf. 65 ,43 (2000). [4] S. P. Obenschain, D. G. Colombant, A. J. Schmitt et al., Phys. Plasmas 13, 056320 (2006).

  2. Multifractal characterisation of a simulated surface flow: A case study with Multi-Hydro in Jouy-en-Josas, France

    NASA Astrophysics Data System (ADS)

    Gires, Auguste; Abbes, Jean-Baptiste; da Silva Rocha Paz, Igor; Tchiguirinskaia, Ioulia; Schertzer, Daniel

    2018-03-01

    In this paper we suggest to innovatively use scaling laws and more specifically Universal Multifractals (UM) to analyse simulated surface runoff and compare the retrieved scaling features with the rainfall ones. The methodology is tested on a 3 km2 semi-urbanised with a steep slope study area located in the Paris area along the Bièvre River. First Multi-Hydro, a fully distributed model is validated on this catchment for four rainfall events measured with the help of a C-band radar. The uncertainty associated with small scale unmeasured rainfall, i.e. occurring below the 1 km × 1 km × 5 min observation scale, is quantified with the help of stochastic downscaled rainfall fields. It is rather significant for simulated flow and more limited on overland water depth for these rainfall events. Overland depth is found to exhibit a scaling behaviour over small scales (10 m-80 m) which can be related to fractal features of the sewer network. No direct and obvious dependency between the overland depth multifractal features (quality of the scaling and UM parameters) and the rainfall ones was found.

  3. 77 FR 62511 - Soule Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ...,400-foot-long conduit tunnel; (5) a powerhouse with approximate dimensions of 80 feet wide by 160 feet.... The proposed project would consist of the following: (1) A 265- foot-high, 903-foot-long Main dam; (2) a 265-foot-high, 2,024 feet-long Saddle dam adjacent to the main dam; (3) a storage reservoir with a...

  4. A probabilistic framework for assessing vulnerability to climate variability and change: The case of the US water supply system

    Treesearch

    Romano Foti; Jorge A. Ramirez; Thomas C. Brown

    2014-01-01

    We introduce a probabilistic framework for vulnerability analysis and use it to quantify current and future vulnerability of the US water supply system. We also determine the contributions of hydro-climatic and socio-economic drivers to the changes in projected vulnerability. For all scenarios and global climatemodels examined, the US Southwest including California and...

  5. 75 FR 3217 - J&T Hydro Company; H. Dean Brooks and W. Bruce Cox; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-20

    ... Ramseur Project No. 11392 located on the Deep River in Randolph County, North Carolina. The transferor and...)(iii)(2009) and the instructions on the Commission's Web site under the ``e-Filing'' link. If unable to... the Commission's Web site located at http://www.ferc.gov/filing-comments.asp . More information about...

  6. Urban water-quality modelling: implementing an extension to Multi-Hydro platform for real case studies

    NASA Astrophysics Data System (ADS)

    Hong, Yi; Giangola-Murzyn, Agathe; Bonhomme, Celine; Chebbo, Ghassan; Schertzer, Daniel

    2015-04-01

    During the last few years, the physically based and fully distributed numerical platform Multi-Hydro (MH) has been developed to simulate hydrological behaviours in urban/peri-urban areas (El-Tabach et al. , 2009 ; Gires et al., 2013 ; Giangola-Murzyn et al., 2014). This hydro-dynamical platform is open-access and has a modular structure, which is designed to be easily scalable and transportable, in order to simulate the dynamics and complex interactions of the water cycle processes in urban or peri-urban environment (surface hydrology, urban groundwater infrastructures and infiltration). Each hydrological module relies on existing and widely validated open source models, such as TREX model (Velleux, 2005) for the surface module, SWMM model (Rossman, 2010) for the drainage module and VS2DT model (Lappala et al., 1987) for the soil module. In our recent studies, an extension of MH has been set up by connecting the already available water-quality computational components among different modules, to introduce a pollutant transport modelling into the hydro-dynamical platform. As for the surface module in two-dimensions, the concentration of particles in flow is expressed by sediment advection equation, the settling of suspended particles is calculated with a simplified settling velocity formula, while the pollutant wash-off from a given land-use is represented as a mass rate of particle removal from the bottom boundary over time, based on transport capacity, which is computed by a modified form of Universal Soil Loss Equation (USLE). Considering that the USLE is originally conceived to predict soil losses caused by runoff in agriculture areas, several adaptations were needed to use it for urban areas, such as the alterations of USLE parameters according to different criterions, the definition of the appropriate initial dust thickness corresponding to various land-uses, etc. Concerning the drainage module, water quality routing within pipes assumes that the conduit behaves as a continuously stirred tank reactor. This extension of Multi-Hydro was tested on two peri-urban catchments located near Paris, the Villecresnes (France, 0.7 km²) and the Le Perreux-sur-Marne (France, 0.2 km²). As the Villecresnes had been analyzed within several European projects (FP7 SMARTeST, KIC-Climate BlueGreenDream, Interreg RainGain), the robustness of the new extension of MH was firstly tested on this basin by comparing the water quantity simulation outcomes with the results already obtained in previous works. Benefiting from the large datasets that are collected in the framework of the ANR (French National Agency for Research) Trafipollu project, the water quality modelling performance of the extension was then illustrated on the catchment of Le Perreux-sur-Marne.

  7. 78 FR 22808 - Special Local Regulations; Pro Hydro-X Tour, Lake Dora; Tavares, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ...-AA08 Special Local Regulations; Pro Hydro-X Tour, Lake Dora; Tavares, FL AGENCY: Coast Guard, DHS... regulation on the waters on Lake Dora in Tavares, Florida during the Pro Hydro-X Tour, a series of high-speed... Hydro-X Tour, a series of high-speed personal watercraft races. The Pro Hydro-X Tour will be held on...

  8. Integrating hydrologic modeling web services with online data sharing to prepare, store, and execute models in hydrology

    NASA Astrophysics Data System (ADS)

    Gan, T.; Tarboton, D. G.; Dash, P. K.; Gichamo, T.; Horsburgh, J. S.

    2017-12-01

    Web based apps, web services and online data and model sharing technology are becoming increasingly available to support research. This promises benefits in terms of collaboration, platform independence, transparency and reproducibility of modeling workflows and results. However, challenges still exist in real application of these capabilities and the programming skills researchers need to use them. In this research we combined hydrologic modeling web services with an online data and model sharing system to develop functionality to support reproducible hydrologic modeling work. We used HydroDS, a system that provides web services for input data preparation and execution of a snowmelt model, and HydroShare, a hydrologic information system that supports the sharing of hydrologic data, model and analysis tools. To make the web services easy to use, we developed a HydroShare app (based on the Tethys platform) to serve as a browser based user interface for HydroDS. In this integration, HydroDS receives web requests from the HydroShare app to process the data and execute the model. HydroShare supports storage and sharing of the results generated by HydroDS web services. The snowmelt modeling example served as a use case to test and evaluate this approach. We show that, after the integration, users can prepare model inputs or execute the model through the web user interface of the HydroShare app without writing program code. The model input/output files and metadata describing the model instance are stored and shared in HydroShare. These files include a Python script that is automatically generated by the HydroShare app to document and reproduce the model input preparation workflow. Once stored in HydroShare, inputs and results can be shared with other users, or published so that other users can directly discover, repeat or modify the modeling work. This approach provides a collaborative environment that integrates hydrologic web services with a data and model sharing system to enable model development and execution. The entire system comprised of the HydroShare app, HydroShare and HydroDS web services is open source and contributes to capability for web based modeling research.

  9. Taming B.C. Hydro: Site C and the implementation of the B.C. Utilities Commission Act

    NASA Astrophysics Data System (ADS)

    Smith, L. Graham

    1988-07-01

    Public policy making in resources management is greatly influenced by the institutional arrangements that arise out of the legal powers, administrative structures, and financial provisions of the decision system. In British Columbia, the institutional arrangements for energy planning in the province have been greatly altered by the passage of the Utilities Commission Act in 1980. This act redefines the policy implementation process for energy in British Columbia and provides for the regulation of the province's power utility, B.C. Hydro. This is the first time that the hitherto autonomous utility has been subject to regulation and the Utilities Commission Act represents a major reform in the institutional arrangements for energy planning in the province. The article evaluates the effectiveness of the 1980 B.C. Utilities Commission Act and assesses the impact of the legislation upon the institutional arrangements for energy planning in the province. Data for the article were derived from written sources and a series of personal interviews with key participants involved with energy planning in B.C. It is shown that the act represented a major departure in the management of energy resources in B.C. Moreover the implementation of the act's provisions, particularly in regard to B.C. Hydro, had a dramatic impact on the development of new energy projects in the province. It is suggested that while the political and economic climate during the period also favored restraint, the major influence on “taming” the utility was passage of the Utilities Commission Act. The article concludes by exploring the implications of policy changes that have occurred as a consequence of the act's impact on B.C. Hydro.

  10. Street Level Hydrology: An Urban Application of the WRF-Hydro Framework in Denver, Colorado

    NASA Astrophysics Data System (ADS)

    Read, L.; Hogue, T. S.; Salas, F. R.; Gochis, D.

    2015-12-01

    Urban flood modeling at the watershed scale carries unique challenges in routing complexity, data resolution, social and political issues, and land surface - infrastructure interactions. The ability to accurately trace and predict the flow of water through the urban landscape enables better emergency response management, floodplain mapping, and data for future urban infrastructure planning and development. These services are of growing importance as urban population is expected to continue increasing by 1.84% per year for the next 25 years, increasing the vulnerability of urban regions to damages and loss of life from floods. Although a range of watershed-scale models have been applied in specific urban areas to examine these issues, there is a trend towards national scale hydrologic modeling enabled by supercomputing resources to understand larger system-wide hydrologic impacts and feedbacks. As such it is important to address how urban landscapes can be represented in large scale modeling processes. The current project investigates how coupling terrain and infrastructure routing can improve flow prediction and flooding events over the urban landscape. We utilize the WRF-Hydro modeling framework and a high-resolution terrain routing grid with the goal of compiling standard data needs necessary for fine scale urban modeling and dynamic flood forecasting in the urban setting. The city of Denver is selected as a case study, as it has experienced several large flooding events in the last five years and has an urban annual population growth rate of 1.5%, one of the highest in the U.S. Our work highlights the hydro-informatic challenges associated with linking channel networks and drainage infrastructure in an urban area using the WRF-Hydro modeling framework and high resolution urban models for short-term flood prediction.

  11. Hydro-mechanical modelling of induced seismicity during the deep geothermal project in St. Gallen, Switzerland

    NASA Astrophysics Data System (ADS)

    Zbinden, Dominik; Rinaldi, Antonio Pio; Kraft, Toni; Diehl, Tobias; Wiemer, Stefan

    2017-04-01

    The St. Gallen deep geothermal project in 2013 was the second geothermal project in Switzerland with the objective of power production after the Enhanced Geothermal System in Basel in 2006. In St. Gallen, the seismic risk was expected to be smaller than in Basel, since the hydrothermal resource was an aquifer at a depth of about 4 km, not expected to require permeability enhancement and associated hydroshearing of the rock. However, after an injectivity test and two acid stimulations, unexpected gas release from an unidentified source forced the operators to inject drilling mud into the well to fight the gas kick. Subsequently, several seismic events were induced, the largest one having a local magnitude of 3.5, which was distinctly felt by the nearby living population. Even though the induced seismicity could not be handled properly, the community still strongly supported the geothermal project. The project was however halted because the target formation was not as permeable as required to deliver sufficient power. Still, controlling induced seismicity during deep geothermal projects is a key factor to successfully operate future geothermal projects. Hence, it is crucial to understand the physical relations of fluid injection, pressure and stress response at reservoir depth as well as associated induced seismicity. To date, these processes are yet not fully understood. In this study, we aim at developing a hydro-mechanical model reproducing the main features of the induced seismic sequence at the St. Gallen geothermal site. Here, we present the conceptual model and preliminary results accounting for hydraulic and mechanical parameters from the geothermal well, geological information from a seismic survey conducted in the St. Gallen region, and actual fluid injection rates from the injectivity tests. In a future step, we are going to use this model to simulate the physical interaction of injected fluid, gas release, hydraulic response of the rock, and induced seismicity during the St. Gallen project. The results will then allow us to more accurately estimate the seismic hazard for future geothermal projects.

  12. The vulnerability and resilience of a city's water footprint: The case of Flagstaff, Arizona, USA

    NASA Astrophysics Data System (ADS)

    Rushforth, Richard R.; Ruddell, Benjamin L.

    2016-04-01

    Research has yet to operationalize water footprint information for urban water policy and planning to reduce vulnerability and increase resilience to water scarcity. Using a county-level database of the U.S. hydro-economy, NWED, we spatially mapped and analyzed the Water Footprint of Flagstaff, Arizona, a small city. Virtual water inflow and outflow networks were developed using the flow of commodities into and out of the city. The power law distribution of virtual water trade volume between Flagstaff and its county trading partners broke at a spatial distance of roughly 2000 km. Most large trading partners are within this geographical distance, and this distance is an objective definition for Flagstaff's zone of indirect hydro-economic influence—that is, its water resource hinterland. Metrics were developed to measure Flagstaff's reliance on virtual water resources, versus direct use of local physical water resources. Flagstaff's reliance on external water supplies via virtual water trade increases both its hydro-economic resilience and vulnerability to water scarcity. These methods empower city managers to operationalize the city's Water Footprint information to reduce vulnerability, increase resilience, and optimally balance the allocation of local physical water supplies with the outsourcing of some water uses via the virtual water supply chain.

  13. Electrodeposition to construct free-standing chitosan/layered double hydroxides hydro-membrane for electrically triggered protein release.

    PubMed

    Zhao, Pengkun; Zhao, Yanan; Xiao, Ling; Deng, Hongbing; Du, Yumin; Chen, Yun; Shi, Xiaowen

    2017-10-01

    In this study, we report the electrodeposition of a chitosan/layered double hydroxides (LDHs) hydro-membrane for protein release triggered by an electrical signal. The electrodeposition was performed in a chitosan and insulin loaded LDHs suspension in the absence of salt. A free-standing chitosan/LDHs hydro-membrane was generated on the electrode with improved mechanical properties, which is dramatically different from the weak hydrogel deposited in the presence of salt. The amount of LDHs in the hydro-membrane affects the optical transmittance and multilayered structure of the hybrid membrane. Compared to the weak chitosan/LDHs hydrogel, the hydro-membrane has a higher insulin loading capacity and the release of insulin is relatively slow. By biasing electrical potentials to the hydro-membrane, the release behavior of insulin can be adjusted accordingly. In addition, the chitosan/LDHs hydro-membrane showed no toxicity to cells. Our results provide a facile method to construct a chitosan/LDHs hybrid multilayered hydro-membrane and suggest the great potential of the hydro-membrane in controlled protein release. Copyright © 2017 Elsevier B.V. All rights reserved.

  14. Climate change and natural disasters: integrating science and practice to protect health.

    PubMed

    Sauerborn, Rainer; Ebi, Kristie

    2012-12-17

    Hydro-meteorological disasters are the focus of this paper. The authors examine, to which extent climate change increases their frequency and intensity. Review of IPCC-projections of climate-change related extreme weather events and related literature on health effects. Projections show that climate change is likely to increase the frequency, intensity, duration, and spatial distribution of a range of extreme weather events over coming decades. There is a need for strengthened collaboration between climate scientists, the health researchers and policy-makers as well as the disaster community to jointly develop adaptation strategies to protect human.

  15. Evaluation and comparison of different RCMs simulations of the Mediterranean climate: a view on the impact of model resolution and Mediterranean sea coupling.

    NASA Astrophysics Data System (ADS)

    Panthou, Gérémy; Vrac, Mathieu; Drobinski, Philippe; Bastin, Sophie; Somot, Samuel; Li, Laurent

    2015-04-01

    As regularly stated by numerous authors, the Mediterranean climate is considered as one major climate 'hot spot'. At least, three reasons may explain this statement. First, this region is known for being regularly affected by extreme hydro-meteorological events (heavy precipitation and flash-floods during the autumn season; droughts and heat waves during spring and summer). Second, the vulnerability of populations in regard of these extreme events is expected to increase during the XXIst century (at least due to the projected population growth in this region). At last, Global Circulation Models project that this regional climate will be highly sensitive to climate change. Moreover, global warming is expected to intensify the hydrological cycle and thus to increase the frequency of extreme hydro-meteorological events. In order to propose adaptation strategies, the robust estimation of the future evolution of the Mediterranean climate and the associated extreme hydro-meteorological events (in terms of intensity/frequency) is of great relevance. However, these projections are characterized by large uncertainties. Many components of the simulation chain can explain these large uncertainties : (i) uncertainties concerning the emission scenario; (ii) climate model simulations suffer of parametrization errors and uncertainties concerning the initial state of the climate; and (iii) the additional uncertainties given by the (dynamical or statistical) downscaling techniques and the impact model. Narrowing (as fine as possible) these uncertainties is a major challenge of the actual climate research. One way for that is to reduce the uncertainties associated with each component. In this study, we are interested in evaluating the potential improvement of : (i) coupled RCM simulations (with the Mediterranean Sea) in comparison with atmosphere only (stand-alone) RCM simulations and (ii) RCM simulations at a finer resolution in comparison with larger resolution. For that, three different RCMs (WRF, ALADIN, LMDZ4) were run, forced by ERA-Interim reanalyses, within the MED-CORDEX experiment. For each RCM, different versions (coupled/stand-alone, high/low resolution) were realized. A large set of scores was developed and applied in order to evaluate the performances of these different RCMs simulations. These scores were applied for three variables (daily precipitation amount, mean daily air temperature and the dry spell lengths). A particular attention was given to the RCM capability to reproduce the seasonal and spatial pattern of extreme statistics. Results show that the differences between coupled and stand-alone RCMs are localized very near the Mediterranean sea and that the model resolution has a slight impact on the scores obtained. Globally, the main differences between the RCM simulations come from the RCM used. Keywords: Mediterranean climate, extreme hydro-meteorological events, RCM simulations, evaluation of climate simulations

  16. The current state of Socio-hydrology

    NASA Astrophysics Data System (ADS)

    Sivapalan, Murugesu; Viglione, Alberto; Di Baldassarre, Giuliano; Pande, Saket

    2016-04-01

    Socio-hydrology was introduced 4 years ago into the scientific lexicon, and elicited several reactions about the meaning and originality of the concept. However, there has also been much activity triggered by the original paper, including further commentaries that clarified the definitions, and several papers that acted on the definitions, and through them further clarified and illustrated the meaning and usefulness of socio-hydrology for understanding coupled human-water systems and underpinning sustainable water management. This presentation discusses how useful these recent studies have been towards the need for socio-hydrology to explain phenomena, such as rise and decline of human population or food production in water scarce basins ('pendulum swing'), the levee effect, small scale farmer suicides, anthropogenic droughts, etc… We also discuss its foundation as a Science, its similarities and dissimilarities with other fields that study human-water interactions, such as hydro-sociology and hydro-economics, its foundation as a Science, current gaps and the challenges that lie ahead.

  17. Research on the innovative hybrid impact hydroforming

    NASA Astrophysics Data System (ADS)

    Lang, Lihui; Wang, Shaohua; Yang, Chunlei

    2013-12-01

    The innovative hybrid impact hydro-forming (IHF) technology is a kind of high strain rate forming technique which can be used for forming complex parts with small features, such as convex tables, bars etc. The present work investigates IHF using a numerical /experimental approach. In this paper, the theory of IHF is presented and finite element simulation was carried out by using MSC. The pressure distribution changes in the depth direction, but not in the width direction. However, the pressure is uniform everywhere in traditional hydro-forming. Using this shock wave loading conditions, forming experiments were carried out. Punching occurred as a result of combined tensile and shear stress effects. Furthermore, results show that using IHF technology, the design constraint to make precise die may be considerably reduced. The need to accurately control punch-die clearance may also be eliminated. Therefore, the research is very useful for forming complicated products.

  18. Collaborative Modular Pumped Hydro Energy Storage Design Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bibeault, Mark Leonide; Roybal, Adam; Bailey, Jr., Richard J.

    In May of 2017, Los Alamos National Laboratory (LANL) through the Applied Engineering Technology Division, Jemez Mountain Electric Cooperative Inc. (JMEC), and Northern New Mexico College (NNMC) agreed to enter into a small, joint, non-binding Modular Pumped Hydro (MPH) design study related to grid level energy storage to begin a process of collaboration. Los Alamos National Laboratory's mission is to solve national security challenges through scientific excellence. The mission of Northern New Mexico College is to ensure student success by providing access to affordable, community-based learning opportunities that meet the educational, cultural, and economic needs of the region. Jemez Mountainmore » Electric Cooperative Inc. is the largest electric co-op in the State of New Mexico providing affordable and reliable electricity to customers in the five counties of Rio Arriba, Santa Fe, San Juan, McKinley and Sandoval.« less

  19. Fatigue of reinforcing bars during hydro-demolition

    NASA Astrophysics Data System (ADS)

    Hyland, C. W. K.; Ouwejan, A.

    2017-05-01

    Reinforcing steel fractured during hydro-demolition of a reinforced concrete pier head due to low cycle flexural fatigue from vibration caused by impact of the high pressure water jet on the exposed length of the bars. Research into the fatigue performance of steel reinforcing steel tends to focus on the high cycle axial performance in reinforced concrete members and re-bending behaviour. However with the increasing use of hydro-demolition of concrete structures as part of remediation works care is required to ensure the steel reinforcement exposed to the high pressure jet of water is not going to suffer relatively low cycle flexural damage that may compromise the designed performance of the completed reinforced concrete structure. This paper describes the failure assessment, fatigue analysis, and metallographic examination that was undertaken. It was found that the rib to flank transition radius on the reinforcement steel was small enough to cause a significant stress concentration effect and was the location of fatigue crack growth. A relatively simple analysis using the maximum unrestrained cantilevered bar length and force exerted by the water jet was used to calculate the maximum expected bending moment. This was compared to the bending capacity at initiation of yielding at the rib flank transition accounting for stress concentration effects. This showed that the observed cyclic reversing ductile crack growth and fracture of the H25 bars was consistent with the loading applied. A method is proposed based on these observations to assess suitable limits for unrestrained bar lengths or maximum working offset of the water jet from the point of bar restraint when undertaking hydro-demolition work. The fatigue critical performance requirements of AS/NZS4671 500E bars are also therefore compared with those of BS4449:2005 and PN EN/ISO 15630-1:2011 for comparable 500C bars

  20. Hydro-geomorphologic events in Portugal and its association with Circulation weather types

    NASA Astrophysics Data System (ADS)

    Pereira, Susana; Ramos, Alexandre M.; Rebelo, Luís; Trigo, Ricardo M.; Zêzere, José L.

    2017-04-01

    Floods and landslides correspond to the most hazardous weather driven natural disasters in Portugal. A recent improvement on their characterization has been achieved with the gathering of basic information on past floods and landslides that caused social consequences in Portugal for the period 1865-2015 through the DISASTER database (Zêzere et al., 2014). This database was built under the assumption that strong social impacts of floods and landslides are sufficient relevant to be reported consistently by national and regional newspapers. The DISASTER database contains detailed information on the location, date of occurrence and social impacts (fatalities, injuries, missing people, evacuated and homeless people) of each individual hydro-geomorphologic case (1677 flood cases and 292 landslide cases). These hydro-geomorphologic disaster cases are grouped in a restrict number of DISASTER events that were selected according to the following criteria: a set of at least 3 DISASTER cases sharing the same trigger in time (with no more than 3 days without cases), which have a widespread spatial extension related to the triggering mechanism and a certain magnitude. In total, the DISASTER database includes 134 events (3.7 average days of duration) that generated high social impacts in Portugal (962 fatalities and 40878 homeless people). Each DISASTER event was characterized with the following attributes: hydro-geomorphologic event type (e.g landslides, floods, flash floods, urban floods); date of occurrence (year, month and days); duration in days; spatial location in GIS; number of fatalities, injured, evacuated and homeless people; and weather type responsible for triggering the event. The atmospheric forcing at different time scales is the main trigger for the hydro-meteorological DISASTER events occurred in Portugal. In this regard there is an urge for a more systematic assessment of the weather types associated to flood and landslide damaging events to correctly characterize the climatic forcing of hydro-geomorphologic risk in Portugal. The weather type classification used herein is an automated version of the Lamb weather type procedure, initially developed for the United Kingdom and often named circulation weather types (CWT) and latter adapted for Portugal. We computed the daily CWT for the 1865-2015 period by means of the daily SLP retrieved from the 20 Century Reanalysis dataset. The relationship between the CWTs and the hydro-meteorological events in Portugal shows that the cyclonic, westerly and southwesterly are CWTs frequently associated with major socio-economic impacts of DISASTER events. In addition, CWT basic variables (flow strength, vorticity and direction) were used to better understand the impacts of the meteorological conditions in the hydro-meteorological events in Portugal. Reference: Zêzere, J. L., Pereira, S., Tavares, A. O., Bateira, C., Trigo, R. M., Quaresma, I., Santos, P. P., Santos, M. and Verde, J.: DISASTER: a GIS database on hydro-geomorphologic disasters in Portugal, Nat. Hazards, 72(2), 503-532, doi:10.1007/s11069-013-1018-y, 2014. This work was supported by the project FORLAND - Hydrogeomorphologic risk in Portugal: driving forces and application for land use planning [grant number PTDC/ATPGEO/1660/2014] funded by the Portuguese Foundation for Science and Technology (FCT), Portugal. A. M. Ramos was also supported by a FCT postdoctoral grant (FCT/DFRH/ SFRH/BPD/84328/2012).

  1. 78 FR 71601 - KC Small Hydro LLC; Advanced Hydropower, Inc.; Notice of Preliminary Permit Application Accepted...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ... total capacity of 1,700 kilowatts (kW), installed within the existing intake tower; (2) an electrical control booth constructed on top of the intake tower; and (3) a 700- foot-long, 13.2 kilo-Volt (kV...; (3) a powerhouse containing two generating units with a total capacity of 3,320 kW; (4) the existing...

  2. Processus de modelisation et etude des orages geomagnetiques dans les reseaux electriques: Impact sur le reseau de transport d'Hydro-Quebec

    NASA Astrophysics Data System (ADS)

    Abdellaoui, Amr

    This research project presents a complete modelling process of the effects of GIC on Hydro-Quebec power system network for system planning studies. The advantage of the presented method is that it enables planning engineers to simulate the effects of geomagnetic disturbances on the Hydro-Quebec System under different conditions and contingencies within reasonable calculation time frame. This modelling method of GIC in electric power systems has been applied to the Hydro-Quebec System. An equivalent HQ DC model has been achieved. A numerical calculation method of DC sources from a non-uniform geoelectric field has been developed and implemented on HQ DC model. Harmonics and increased reactive power losses of saturated transformers have been defined as a function of GIC through a binary search algorithm using a chosen HQ magnetization curve. The evolution in time of each transformer saturation according to its effective GIC has been evaluated using analytical formulas. The reactive power losses of saturated transformers have been modeled in PSS/E[1] HQ network as constant reactive current loads assigned to the corresponding transformer buses. Finally, time domain simulations have been performed with PSS/E taking into account transformer saturation times. This has been achieved by integrating HQ DC model results and analytical calculations results of transformer saturation times into an EMTP load model. An interface has been used to link EMTP load model to HQ PSS/E network. Different aspects of GIC effects on the Hydro-Quebec system have been studied, including the influence of uniform and non-uniform geoelectric fields, the comparison of reactive power losses of the 735kV HQ system with those of Montreal network, the risks to voltage levels and the importance of reactive power dynamic reserve. This dissertation presents a new GIC modelling approach for power systems for planning and operations purposes. This methodology could be further enhanced, particularly, the aspect regarding the transformer saturation times. Hence more research remains to be pursued in this area.

  3. 76 FR 74783 - Apache Hydro LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... project would consist of the following: (1) A 210-foot-high, 1,610-foot-long earth fill dam; (2) a 20-foot... acre-foot storage capacity; (4) a 170-foot-high, 1,270.0-foot-long earth fill dam creating; (5) a lower... prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must...

  4. 77 FR 56826 - Red River Hydro LLC; Notice of Application Accepted for Filing, Soliciting Motions To Intervene...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... generate power using flows between 2,700 and 49,800 cubic feet per second (cfs). If flows are less than 2,700 cfs, all flow would go through the Corps' gates, and the project would then be offline. When flows are greater than 49,800 cfs, the excess flow would be directed through the Corps' gates. m. A copy of...

  5. Walking a tightrope: Hydro construction in environmentally sensitive areas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallaher, P.M.; Hansen, P.M.

    Alaska's Bradley Lake hydroelectric project will begin generating electricity in September. It follows the example set by Terror Lake eight years ago of how to develop a clean, renewable energy source and, at the same time, to take care of the environment. This article describes the special precautions taken to mitigate environmental impacts during and after construction, and the cooperation necessary among the owner, state agencies, and federal agencies.

  6. Canadian and US agencies use bubbles to aid salmon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    B.C. Hydro, Canada's federal Department of Fisheries and Oceans, and the Bureau of Reclamation in the US have implemented unique bubbler systems that release compressed air to aid fish migration and improve spawning habitat. In each case, compressed air equipment produced bubbles that lifted cool water from a lake bottom to displace warmer water on top. An experimental project during the summer of 1992, involving BC Hydro and the Department of Fisheries and Oceans, succeeded in reducing the mortality rate of sockeye salmon on their migration up the Somass River from the Alberni Inlet to Great Central Lake on Vancouvermore » Island. The bubbler system cooled the water to aid the migration of hundreds of thousands of fish who were reluctant to continue upstream due to exceptionally warm water temperatures. Participants in the project suspended a large lead-weighted plastic curtain (more than 12 meters tall and extending the length of three football fields) from a series of floats across the outlet of Grand Central Lake. Compressed air equipment was installed behind the curtain to produce bubbles to lift cool water from the lake bottom. Water flowing into the river ranged from 1 to 3 degrees cooler than water on the other side of the curtain.« less

  7. Hydro-economic modeling of the role of forests on water resources production in Andalusia, Spain

    NASA Astrophysics Data System (ADS)

    Beguería, Santiago; Serrano-Notivoli, Roberto; Álvarez-Palomino, Alejandro; Campos, Pablo

    2014-05-01

    The development of more refined information tools is a pre-requisite for supporting decision making in the context of integrated water resources management. Among these tools, hydro-economic models are favoured because they allow integrating the ecological, hydrological, infrastructure and economic aspects into a coherent, scientifically-informed framework. We present a case study that assesses physically the water resources of forest lands of the Andalusia region in Spain and conducts an economic environmental income and asset valuation of the forest surface water yield. We show how, based on available hydrologic and economic data, we can develop a comprehensive water account for all the forest lands at the regional scale. This forest water environmental valuation is part of the larger RECAMAN project, which aims at providing a robust and easily replicable accounting tool to evaluate yearly the total income an capital generated by the forest land, encompassing all measurable sources of private and public incomes (timber and cork production, auto-consumption, recreational activities, biodiversity conservation, carbon sequestration, water production, etc.). Only a comprehensive integrated tool such as the one built within the RECAMAN project may serve as a basis for the development of integrated policies such as those internationally agreed and recommended for the management of water resources.

  8. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Huertas-Hernando, Daniel; Farahmand, Hossein; Holttinen, Hannele

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as wellmore » as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.« less

  9. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro...(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor Hydro) requests a limited waiver of Part 358 of the Commission's Regulations, Standards of Conduct for...

  10. Intercomparison of different uncertainty sources in hydrological climate change projections for an alpine catchment (upper Clutha River, New Zealand)

    NASA Astrophysics Data System (ADS)

    Jobst, Andreas M.; Kingston, Daniel G.; Cullen, Nicolas J.; Schmid, Josef

    2018-06-01

    As climate change is projected to alter both temperature and precipitation, snow-controlled mid-latitude catchments are expected to experience substantial shifts in their seasonal regime, which will have direct implications for water management. In order to provide authoritative projections of climate change impacts, the uncertainty inherent to all components of the modelling chain needs to be accounted for. This study assesses the uncertainty in potential impacts of climate change on the hydro-climate of a headwater sub-catchment of New Zealand's largest catchment (the Clutha River) using a fully distributed hydrological model (WaSiM) and unique ensemble encompassing different uncertainty sources: general circulation model (GCM), emission scenario, bias correction and snow model. The inclusion of snow models is particularly important, given that (1) they are a rarely considered aspect of uncertainty in hydrological modelling studies, and (2) snow has a considerable influence on seasonal patterns of river flow in alpine catchments such as the Clutha. Projected changes in river flow for the 2050s and 2090s encompass substantial increases in streamflow from May to October, and a decline between December and March. The dominant drivers are changes in the seasonal distribution of precipitation (for the 2090s +29 to +84 % in winter) and substantial decreases in the seasonal snow storage due to temperature increase. A quantitative comparison of uncertainty identified GCM structure as the dominant contributor in the seasonal streamflow signal (44-57 %) followed by emission scenario (16-49 %), bias correction (4-22 %) and snow model (3-10 %). While these findings suggest that the role of the snow model is comparatively small, its contribution to the overall uncertainty was still found to be noticeable for winter and summer.

  11. Small Hydropower Development in Rwanda: Trends, Opportunities and Challenges

    NASA Astrophysics Data System (ADS)

    Geoffrey, Gasore; Zimmerle, Daniel; Ntagwirumugara, Etienne

    2018-04-01

    The Rift Valley region of Sub-Saharan Africa represents a promising area for the development of small (<5MW) hydropower resources. This study compiles data from government and UN agency reports to analyze different development outlooks. The study found that there has been a rapid deployment of small hydropower in the last 10 years. From the current total deployed small hydro of 47.5 MW, 16.5MW (35%) were deployed from 1957 to 1984 while the remaining 31 MW (65%) were deployed from 2007 to 2017. While all systems constructed prior to 1985 are grid-connected, one third of the 24 facilities constructed after 2007 are connected to off-grid systems. The study provides an overview of the economic incentives for developing small hydropower systems in Rwanda and the potential contribution of that development to Rwanda’s electrification goals.

  12. Setting up an atmospheric-hydrologic model for seasonal forecasts of water flow into dams in a mountainous semi-arid environment (Cyprus)

    NASA Astrophysics Data System (ADS)

    Camera, Corrado; Bruggeman, Adriana; Zittis, Georgios; Hadjinicolaou, Panos

    2017-04-01

    Due to limited rainfall concentrated in the winter months and long dry summers, storage and management of water resources is of paramount importance in Cyprus. For water storage purposes, the Cyprus Water Development Department is responsible for the operation of 56 large dams total volume of 310 Mm3) and 51 smaller reservoirs (total volume of 17 Mm3) over the island. Climate change is also expected to heavily affect Cyprus water resources with a 1.5%-12% decrease in mean annual rainfall (Camera et al., 2016) projected for the period 2020-2050, relative to 1980-2010. This will make reliable seasonal water inflow forecasts even more important for water managers. The overall aim of this study is to set-up the widely used Weather Research and Forecasting (WRF) model with its hydrologic extension (WRF-hydro), for seasonal forecasts of water inflow in dams located in the Troodos Mountains of Cyprus. The specific objectives of this study are: i) the calibration and evaluation of WRF-Hydro for the simulation of stream flows, in the Troodos Mountains, for past rainfall seasons; ii) a sensitivity analysis of the model parameters; iii) a comparison of the application of the atmospheric-hydrologic modelling chain versus the use of climate observations as forcing. The hydrologic model is run in its off-line version with daily forcing over a 1-km grid, while the overland and channel routing is performed on a 100-m grid with a time-step of 6 seconds. Model outputs are exported on a daily base. First, WRF-Hydro is calibrated and validated over two 1-year periods (October-September), using a 1-km gridded observational precipitation dataset (Camera et al., 2014) as input. For the calibration and validation periods, years with annual rainfall close to the long-term average and with the presence of extreme rainfall and flow events were selected. A sensitivity analysis is performed, for the following parameters: partitioning of rainfall into runoff and infiltration (REFKDT), the partitioning of deep percolation between losses and baseflow contribution (LOSS_BASE), water retention depth (RETDEPRTFAC), overland roughness (OVROUGHRTFAC), and channel manning coefficients (MANN). The calibrated WRF-Hydro shows a good ability to reproduce annual total streamflow (-19% error) and total peak discharge volumes (+3% error), although very high values of MANN were used to match the timing of the peak and get positive values of Nash-Sutcliffe efficiency coefficient (0.13). The two most sensitive parameters for the modeled seasonal flow were REFKDT and LOSS_BASE. Simulations of the calibrated WRF-Hydro with WRF modelled atmospheric forcing showed high errors in comparison with those forced with observations, which can be corrected only by modifying the most sensitive parameters by at least one order of magnitude. This study has received funding from the EU H2020 BINGO Project (GA 641739). Camera C., Bruggeman A., Hadjinicolaou P., Pashiardis S., Lange M.A., 2016. Evaluation of interpolation techniques for the creation of gridded daily precipitation (1 × 1 km2); Cyprus, 1980-2010. J Geophys Res Atmos 119, 693-712, DOI:10.1002/2013JD020611 Camera C., Bruggeman A., Hadjinicolaou P., Michaelides S., Lange M.A., 2016. Evaluation of a spatial rainfall generator for generating high resolution precipitation projections over orographically complex terrain. Stoch Environ Res Risk Assess, DOI 10.1007/s00477-016-1239-1

  13. Hydrologic and Agent-based Modelling of Hydro-refugia in East Africa, Insights into the Importance of Water Resources in Hominin Evolution and Dispersal

    NASA Astrophysics Data System (ADS)

    Ashley, G. M.; Cuthbert, M. O.; Gleeson, T. P.; Reynolds, S. R.; Bennett, M. R.; Newton, A. C.; McCormack, C. J.

    2017-12-01

    Hominin evolution and climate variability have often been linked because of the apparent coincidence of climate fluctuations and speciation or extinctions, although the cause and effect of climate on natural selection is not clear. Climate in the EARS (East African Rift System) where most hominin first occurrences are located experienced an overall drying over the last 7 myr. Superimposed on this trend, Milankovitch cycles generated wet-dry precession cycles ( 23 kyr) that changed both water and food resource availability. During dry periods, lakes became more alkaline and rivers ephemeral but, groundwater, buffered from surface climate effects, remained a potential resource during the driest of times. The possibility of widespread groundwater sources hydro-refugia, such as springs, wetlands and groundwater-fed perennial streams has received little attention with respect to the paleoenvironmental context of hominin evolution or dispersal. We demonstrate that hydrogeological modelling of the modern landscape in East Africa coupled with ABM (agent-based modelling) of hominin movement yields new insight into potential correlates of hominin survival and dispersal. Digitized hydrological mapping of present day rivers, lakes and springs along the EARS (2000 km) from northern Tanzania to Ethiopia provided the modelling framework. Present day conditions are considered analogous to past dry periods; wet period conditions are an expanded hydrologic network including all surface water bodies. Our focus was on perennial springs discharging at 1,000 m3/y (volume to sustain a small wetland). 450 such springs occur and were found to be significantly controlled by geology, not just climate. The ABM was designed to determine if it was possible for humans to walk between hydro-refugia in 3 days. Four climate scenarios were run on ABM: wet, wet-to-dry, dry and dry-to-wet. During dry periods our results suggest that groundwater availability would have been critical to supporting isolated networks of hydro-refugia when potable surface water was scarce. As the climate got wetter modeled cross-rift dispersal potentially occurred before movement along the rift. The presence of groundwater hydro-refugia may help explain how some patterns of taxonomic diversity in hominins may have developed.

  14. Confined wetting of FoCa clay powder/pellet mixtures: Experimentation and numerical modeling

    NASA Astrophysics Data System (ADS)

    Maugis, Pascal; Imbert, Christophe

    Potential geological nuclear waste disposals must be properly sealed to prevent contamination of the biosphere by radionuclides. In the framework of the RESEAL project, the performance of a bentonite shaft seal is currently studied at Mol (Belgium). This paper focuses on the hydro-mechanical physical behavior of centimetric, unsaturated samples of the backfilling material - a mixture of FoCa-clay powder and pellets - during oedometer tests. The hydro-mechanical response of the samples is observed experimentally, and then compared to numerical simulations performed by our Cast3M Finite Element code. The generalized Darcy’s law and the Barcelona Basic Model mechanical model formed the physical basis of the numerical model and the interpretation. They are widely used in engineered barriers modeling. Vertical swelling pressure and water intake were measured throughout the test. Although water income presents a monotonous increase, the swelling pressure evolution is marked by a peak, and then a local minimum before increasing again to an asymptotic value. This unexpected behavior is explained by yielding rather than by heterogeneity. It is satisfactorily reproduced by the model after parameter calibration. Several samples with different heights ranging from 5 to 12 cm show the same hydro-mechanical response, apart from a dilatation of the time scale. The interest of the characterization of centimetric samples to predicting the efficiency of a metric sealing is discussed.

  15. Assessment of the water balance over France using regionalized Turc-Pike formula

    NASA Astrophysics Data System (ADS)

    Le Lay, Matthieu; Garçon, Rémy; Gailhard, Joël; Garavaglia, Federico

    2016-04-01

    With extensive use of hydrological models over a wide range of hydro-climatic contexts, bias in hydro-climatic data may lead to unreliable models and thus hydrological forecasts and projections. This issue is particularly pregnant when considering mountainous areas with great uncertainties on precipitations, or when considering complex unconservative catchments (e.g. karstic systems). The Turc-Pike water balance formula, analogous to the classical Budyko formula, is a simple and efficient mathematical formulation relating long-term average streamflow to long-term average precipitation and potential evaporation. In this study, we propose to apply this framework to assess and eventually adjust the water-balance before calibrating an operational hydrologic model (MORDOR model). Considering a large set of 350 french catchments, the Turc-Pike formula is regionalized based on ecohydrologic criterions to handle various hydro-climatic contexts. This interannual regional model is then applied to assess the water-balance over numerous catchments and various conditions, such as karstic, snow-driven or glaciarized and even anthropized catchments. Results show that it is possible to obtain pretty realistic corrections of meteorological inputs (precipitations, temperature or potential evaporation) or hydrologic surface (or runoff). These corrections can often be confirmed a posteriori by exogenous information. Positive impacts on hydrologic model's calibration are also demonstrated. This methodology is now operational for hydrologic applications at EDF (Electricité de France, French electric utility company), and therefore applied on hundreds of catchments.

  16. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    NASA Astrophysics Data System (ADS)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  17. A 3-D Approach for Teaching and Learning about Surface Water Systems through Computational Thinking, Data Visualization and Physical Models

    NASA Astrophysics Data System (ADS)

    Caplan, B.; Morrison, A.; Moore, J. C.; Berkowitz, A. R.

    2017-12-01

    Understanding water is central to understanding environmental challenges. Scientists use `big data' and computational models to develop knowledge about the structure and function of complex systems, and to make predictions about changes in climate, weather, hydrology, and ecology. Large environmental systems-related data sets and simulation models are difficult for high school teachers and students to access and make sense of. Comp Hydro, a collaboration across four states and multiple school districts, integrates computational thinking and data-related science practices into water systems instruction to enhance development of scientific model-based reasoning, through curriculum, assessment and teacher professional development. Comp Hydro addresses the need for 1) teaching materials for using data and physical models of hydrological phenomena, 2) building teachers' and students' comfort or familiarity with data analysis and modeling, and 3) infusing the computational knowledge and practices necessary to model and visualize hydrologic processes into instruction. Comp Hydro teams in Baltimore, MD and Fort Collins, CO are integrating teaching about surface water systems into high school courses focusing on flooding (MD) and surface water reservoirs (CO). This interactive session will highlight the successes and challenges of our physical and simulation models in helping teachers and students develop proficiency with computational thinking about surface water. We also will share insights from comparing teacher-led vs. project-led development of curriculum and our simulations.

  18. Impact of landuse/land cover change on run-off in the catchment of a hydro power project

    NASA Astrophysics Data System (ADS)

    Khare, Deepak; Patra, Diptendu; Mondal, Arun; Kundu, Sananda

    2017-05-01

    The landuse/land cover change and rainfall have a significant influence on the hydrological response of the river basins. The run-off characteristics are changing naturally due to reduction of initial abstraction that increases the run-off volume. Therefore, it is necessary to quantify the changes in the run-off characteristics of a catchment under the influence of changed landuse/land cover. Soil conservation service model has been used in the present study to analyse the impact of various landuse/land cover (past, present and future time period) change in the run-off characteristics of a part of Narmada basin at the gauge discharge site of Mandaleswar in Madhya Pradesh, India. Calculated run-off has been compared with the observed run-off data for the study. The landuse/land cover maps of 1990, 2000 and 2009 have been prepared by digital classification method with proper accuracy using satellite imageries. The impact of the run-off change on hydro power potential has been assessed in the study along with the estimation of the future changes in hydro power potential. Five types of conditions (+10, +5 %, average, -5, -10 % of average rainfall) have been applied with 90 and 75 % dependability status. The generated energy will be less in 90 % dependable flow in respect to the 75 % dependable flow. This work will be helpful for future planning related to establishment of hydropower setup.

  19. Trash Diverter Orientation Angle Optimization at Run-Off River Type Hydro-power Plant using CFD

    NASA Astrophysics Data System (ADS)

    Munisamy, Kannan M.; Kamal, Ahmad; Shuaib, Norshah Hafeez; Yusoff, Mohd. Zamri; Hasini, Hasril; Rashid, Azri Zainol; Thangaraju, Savithry K.; Hamid, Hazha

    2010-06-01

    Tenom Pangi Hydro Power Station in Tenom, Sabah is suffering from poor river quality with a lot of suspended trashes. This problem necessitates the need for a trash diverter to divert the trash away from the intake region. Previously, a trash diverter (called Trash Diverter I) was installed at the site but managed to survived for a short period of time due to an impact with huge log as a results of a heavy flood. In the current project, a second trash diverter structure is designed (called Trash Diverter II) with improved features compared to Trash Diverter I. The Computational Fluid Dynamics (CFD) analysis is done to evaluate the river flow interaction onto the trash diverter from the fluid flow point of view, Computational Fluids Dynamics is a numerical approach to solve fluid flow profile for different inlet conditions. In this work, the river geometry is modeled using commercial CFD code, FLUENT®. The computational model consists of Reynolds Averaged Navier-Stokes (RANS) equations coupled with other related models using the properties of the fluids under investigation. The model is validated with site-measurements done at Tenom Pangi Hydro Power Station. Different operating condition of river flow rate and weir opening is also considered. The optimum angle is determined in this simulation to further use the data for 3D simulation and structural analysis.

  20. 75 FR 11150 - Free Flow Power Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... Qualified Hydro 23, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting... Power Qualified Hydro 23, LLC (FFP Qualified Hydro 23) filed an application for a preliminary permit... new 2.6-mile- long, 23-kilovolt transmission line; and (5) appurtenant facilities. The proposed...

  1. HydroViz: A web-based hydrologic observatory for enhancing hydrology and earth-science education

    NASA Astrophysics Data System (ADS)

    Habib, E. H.; Ma, Y.; Williams, D.

    2010-12-01

    The main goal of this study is to develop a virtual hydrologic observatory (HydroViz) that integrates hydrologic field observations with numerical simulations by taking advantage of advances in hydrologic field & remote sensing data, computer modeling, scientific visualization, and web resources and internet accessibility. The HydroViz system is a web-based teaching tool that can run on any web browsers. It leverages the strength of Google Earth to provide authentic and hands-on activities to improve learning. Evaluation of the HydroViz was performed in three engineering courses (a senior level course and two Introductory courses at two different universities). Evaluation results indicate that HydroViz provides an improvement over existing engineering hydrology curriculum. HydroViz was effective in facilitating students’ learning and understanding of hydrologic concepts & increasing related skills. HydroViz was much more effective for students in engineering hydrology classes rather than at the freshmen introduction to civil engineering class. We found that HydroViz has great potential for freshmen audience. Even though HydroViz was challenging to some freshmen, most of them still learned the key concepts and the tool increased the enthusiasm for half of the freshmen. The evaluation provided suggestions to create a simplified version of HydroViz for freshmen-level courses students. It identified concepts and tasks that might be too challenging or irrelevant to the freshmen and areas where we could provide more guidance in the tool. After the first round of evaluation, the development team has made significant improvements to HydroViz, which would further improve its effectiveness for next round of class applications which is planned for the Fall of 2010 to take place in 5 classes at 4 different institutions.

  2. Pharmacokinetics and behavioral effects of liposomal hydromorphone suitable for perioperative use in rhesus macaques

    PubMed Central

    KuKanich, Butch; Schmidt, Brynn; Heath, Timothy D.; Brown, Carolyn

    2011-01-01

    Introduction This study aims to evaluate the pharmacokinetic, behavioral, and motor effects of a liposomal preparation of hydromorphone hydrochloride (LE-hydro) in rhesus monkeys. We administered either 2 mg/kg of LE-hydro (n=8) subcutaneous (s.c.) or 0.1 mg/kg of standard pharmaceutical hydromorphone HCl (hydro) preparation either intravenous (i.v.; n=4) or s.c. (n=5). Materials and methods Serial blood samples were drawn after injection and analyzed for serum hydro concentration by liquid chromatography/mass spectrometry. Following s.c. injection of 0.1 mg/kg hydro or 2 mg/kg LE-hydro, behavioral evaluations were conducted in groups of rhesus monkeys (n=10/group) in the presence of a compatible stimulus animal and motor skills were also evaluated (n=10/group). The motor skills test consisted of removing a food reward (carrot ring) from either a straight peg (simple task) or a curved peg (difficult task). Results LE-hydro (MRT0-INF = 105.9 h) demonstrated extended-release pharmacokinetics compared to hydro when administered by either i.v. (MRT0-INF =1.1 h) or s.c. (MRT0-INF =1.3 h) routes. Hydro did not affect motor performance of the simpler task, but the monkeys’ performance deteriorated on the more difficult task at 0.5 and 1 h after injection. LE-hydro had no effect on motor skills in either the simpler or more difficult task. Conclusions The results of these studies indicate that LE-hydro has a pharmacokinetic and behavioral side effects profile consistent with an analgesic that could be tested for surgical use in animals. Our studies also expand the use of rhesus monkeys as a translational behavioral pharmacodynamics model for testing extended-release opioid medication. PMID:21404039

  3. Evaluation of snow and frozen soil parameterization in a cryosphere land surface modeling framework in the Tibetan Plateau

    NASA Astrophysics Data System (ADS)

    Zhou, J.

    2017-12-01

    Snow and frozen soil are important components in the Tibetan Plateau, and influence the water cycle and energy balances through snowpack accumulation and melt and soil freeze-thaw. In this study, a new cryosphere land surface model (LSM) with coupled snow and frozen soil parameterization was developed based on a hydrologically improved LSM (HydroSiB2). First, an energy-balance-based three-layer snow model was incorporated into HydroSiB2 (hereafter HydroSiB2-S) to provide an improved description of the internal processes of the snow pack. Second, a universal and simplified soil model was coupled with HydroSiB2-S to depict soil water freezing and thawing (hereafter HydroSiB2-SF). In order to avoid the instability caused by the uncertainty in estimating water phase changes, enthalpy was adopted as a prognostic variable instead of snow/soil temperature in the energy balance equation of the snow/frozen soil module. The newly developed models were then carefully evaluated at two typical sites of the Tibetan Plateau (TP) (one snow covered and the other snow free, both with underlying frozen soil). At the snow-covered site in northeastern TP (DY), HydroSiB2-SF demonstrated significant improvements over HydroSiB2-F (same as HydroSiB2-SF but using the original single-layer snow module of HydroSiB2), showing the importance of snow internal processes in three-layer snow parameterization. At the snow-free site in southwestern TP (Ngari), HydroSiB2-SF reasonably simulated soil water phase changes while HydroSiB2-S did not, indicating the crucial role of frozen soil parameterization in depicting the soil thermal and water dynamics. Finally, HydroSiB2-SF proved to be capable of simulating upward moisture fluxes toward the freezing front from the underlying soil layers in winter.

  4. Development of a land surface model with coupled snow and frozen soil physics

    NASA Astrophysics Data System (ADS)

    Wang, Lei; Zhou, Jing; Qi, Jia; Sun, Litao; Yang, Kun; Tian, Lide; Lin, Yanluan; Liu, Wenbin; Shrestha, Maheswor; Xue, Yongkang; Koike, Toshio; Ma, Yaoming; Li, Xiuping; Chen, Yingying; Chen, Deliang; Piao, Shilong; Lu, Hui

    2017-06-01

    Snow and frozen soil are important factors that influence terrestrial water and energy balances through snowpack accumulation and melt and soil freeze-thaw. In this study, a new land surface model (LSM) with coupled snow and frozen soil physics was developed based on a hydrologically improved LSM (HydroSiB2). First, an energy-balance-based three-layer snow model was incorporated into HydroSiB2 (hereafter HydroSiB2-S) to provide an improved description of the internal processes of the snow pack. Second, a universal and simplified soil model was coupled with HydroSiB2-S to depict soil water freezing and thawing (hereafter HydroSiB2-SF). In order to avoid the instability caused by the uncertainty in estimating water phase changes, enthalpy was adopted as a prognostic variable instead of snow/soil temperature in the energy balance equation of the snow/frozen soil module. The newly developed models were then carefully evaluated at two typical sites of the Tibetan Plateau (TP) (one snow covered and the other snow free, both with underlying frozen soil). At the snow-covered site in northeastern TP (DY), HydroSiB2-SF demonstrated significant improvements over HydroSiB2-F (same as HydroSiB2-SF but using the original single-layer snow module of HydroSiB2), showing the importance of snow internal processes in three-layer snow parameterization. At the snow-free site in southwestern TP (Ngari), HydroSiB2-SF reasonably simulated soil water phase changes while HydroSiB2-S did not, indicating the crucial role of frozen soil parameterization in depicting the soil thermal and water dynamics. Finally, HydroSiB2-SF proved to be capable of simulating upward moisture fluxes toward the freezing front from the underlying soil layers in winter.

  5. Meeting the challenge of policy-relevant science: lessons from a water resource project

    USGS Publications Warehouse

    Lamb, Berton L.

    1986-01-01

    Water resource scientists face complex tasks in evaluating aspects of water projects, but relatively few assessment procedures have been applied and accepted as standard applications. Decision-makers often rely on environmental assessments to evaluate the value and operation of projects. There is often confusion about scientists' role in policy decisions. The scientist can affect policy-making as an expert withess, an advocate or a surrogate. By understanding the policy process, scientists can make their work more “policy relevant.” Using the Terror Lake hydro project in Alaska as a guide, three lessons are discussed: (1) not all problems are able to be solved with technology; (2) policy-relevant technology is rarely imposed on a problem; and (3) the scientist need not just react to the policy process, but can have an impact on how that process unfolds.

  6. Geomechanical/Geochemical Modeling Studies Conducted within theInternational DECOVALEX Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birkholzer, J.T.; Rutqvist, J.; Sonnenthal, E.L.

    2005-10-19

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysismore » of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status.« less

  7. Geomechanical/ Geochemical Modeling Studies onducted Within the International DECOVALEX Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.T. Birkholzer; J. Rutqvist; E.L. Sonnenthal

    2006-02-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysismore » of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status.« less

  8. Hydro-meteorological extreme events in the 18th century in Portugal

    NASA Astrophysics Data System (ADS)

    Fragoso, Marcelo; João Alcoforado, Maria; Taborda, João Paulo

    2013-04-01

    The present work is carried out in the frame of the KLIMHIST PROJECT ("Reconstruction and model simulations of past climate in Portugal using documentary and early instrumental sources, 17th-19th century)", and is devoted to the study of hydro-meteorological extreme events during the last 350 years, in order to understand how they have changed in time and compare them with current analogues. More specifically, the results selected to this presentation will focus on some hydro-meteorological extreme events of the 18th century, like severe droughts, heavy precipitation episodes and windstorms. One of the most noteworthy events was the winterstorm Bárbara (3rd to 6th December 1739), already studied in prior investigations (Taborda et al, 2004; Pfister et al, 2010), a devastating storm with strong impacts in Portugal caused by violent winds and heavy rainfall. Several other extreme events were detected by searching different documentary archives, including individual, administrative and ecclesiastic sources. Moreover, a more detailed insight to the 1783-1787 period will be made with regard the Lisbon region, taking into consideration the availability of information for daily meteorological observations as well as documentary evidences, like descriptions from Gazeta de Lisboa, the periodic with more continuous publication in the 18thcentury. Key-words: Instrumental data, Documentary data, Extreme events, Klimhist Project, Portugal References Pfister, C., Garnier, E., Alcoforado, M.J., Wheeler, D. Luterbacher, J. Nunes, M.F., Taborda, J.P. (2010) The meteorological framework and the cultural memory of three severe winter-storms in early eighteenth-century Europe, Climatic Change, 101, 1-2, 281-310 Taborda, JP; Alcoforado, MJ and Garcia, JC (2004) O Clima do Sul de Portugal no Séc.XVIII, Centro de Estudos Geográficos, Área de de Investigação de Geo-Ecologia, relatório no 2

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gutierrez, Marte

    Colorado School of Mines conducted research and training in the development and validation of an advanced CO{sub 2} GS (Geological Sequestration) probabilistic simulation and risk assessment model. CO{sub 2} GS simulation and risk assessment is used to develop advanced numerical simulation models of the subsurface to forecast CO2 behavior and transport; optimize site operational practices; ensure site safety; and refine site monitoring, verification, and accounting efforts. As simulation models are refined with new data, the uncertainty surrounding the identified risks decrease, thereby providing more accurate risk assessment. The models considered the full coupling of multiple physical processes (geomechanical and fluidmore » flow) and describe the effects of stochastic hydro-mechanical (H-M) parameters on the modeling of CO{sub 2} flow and transport in fractured porous rocks. Graduate students were involved in the development and validation of the model that can be used to predict the fate, movement, and storage of CO{sub 2} in subsurface formations, and to evaluate the risk of potential leakage to the atmosphere and underground aquifers. The main major contributions from the project include the development of: 1) an improved procedure to rigorously couple the simulations of hydro-thermomechanical (H-M) processes involved in CO{sub 2} GS; 2) models for the hydro-mechanical behavior of fractured porous rocks with random fracture patterns; and 3) probabilistic methods to account for the effects of stochastic fluid flow and geomechanical properties on flow, transport, storage and leakage associated with CO{sub 2} GS. The research project provided the means to educate and train graduate students in the science and technology of CO{sub 2} GS, with a focus on geologic storage. Specifically, the training included the investigation of an advanced CO{sub 2} GS simulation and risk assessment model that can be used to predict the fate, movement, and storage of CO{sub 2} in underground formations, and the evaluation of the risk of potential CO{sub 2} leakage to the atmosphere and underground aquifers.« less

  10. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT HYDRO COMPLIANCE MANAGEMENT, INC. HYDRO-KLEEN FILTRATION SYSTEM, 03/07/WQPC-SWP, SEPTEMBER 2003

    EPA Science Inventory

    Verification testing of the Hydro-Kleen(TM) Filtration System, a catch-basin filter designed to reduce hydrocarbon, sediment, and metals contamination from surface water flows, was conducted at NSF International in Ann Arbor, Michigan. A Hydro-Kleen(TM) system was fitted into a ...

  11. 40 CFR 721.1880 - Borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)-.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...)hydro-, sodium, (T-4)-. 721.1880 Section 721.1880 Protection of Environment ENVIRONMENTAL PROTECTION... New Uses for Specific Chemical Substances § 721.1880 Borate(1-), tris(acetato-.kappa.O)hydro-, sodium... substance identified as borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)- (PMN P-00-0922; CAS No...

  12. 40 CFR 721.1880 - Borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)-.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...)hydro-, sodium, (T-4)-. 721.1880 Section 721.1880 Protection of Environment ENVIRONMENTAL PROTECTION... New Uses for Specific Chemical Substances § 721.1880 Borate(1-), tris(acetato-.kappa.O)hydro-, sodium... substance identified as borate(1-), tris(acetato-.kappa.O)hydro-, sodium, (T-4)- (PMN P-00-0922; CAS No...

  13. 78 FR 34570 - Special Local Regulations; Pro Hydro-X Tour, Lake Dora; Tavares, FL

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-10

    ...-AA08 Special Local Regulations; Pro Hydro-X Tour, Lake Dora; Tavares, FL AGENCY: Coast Guard, DHS... waters of Lake Dora in Tavares, Florida, during the Pro Hydro-X Tour, a series of high-speed personal... published a notice of proposed rulemaking (NPRM) entitled Special Local Regulations; Pro Hydro-X Tour, Lake...

  14. Climate change and natural disasters – integrating science and practice to protect health

    PubMed Central

    Sauerborn, Rainer; Ebi, Kristie

    2012-01-01

    Background Hydro-meteorological disasters are the focus of this paper. The authors examine, to which extent climate change increases their frequency and intensity. Methods Review of IPCC-projections of climate-change related extreme weather events and related literature on health effects. Results Projections show that climate change is likely to increase the frequency, intensity, duration, and spatial distribution of a range of extreme weather events over coming decades. Conclusions There is a need for strengthened collaboration between climate scientists, the health researchers and policy-makers as well as the disaster community to jointly develop adaptation strategies to protect human. PMID:23273248

  15. [Demography perspectives and forecasts of the demand for electricity].

    PubMed

    Roy, L; Guimond, E

    1995-01-01

    "Demographic perspectives form an integral part in the development of electric load forecasts. These forecasts in turn are used to justify the addition and repair of generating facilities that will supply power in the coming decades. The goal of this article is to present how demographic perspectives are incorporated into the electric load forecasting in Quebec. The first part presents the methods, hypotheses and results of population and household projections used by Hydro-Quebec in updating its latest development plan. The second section demonstrates applications of such demographic projections for forecasting the electric load, with a focus on the residential sector." (SUMMARY IN ENG AND SPA) excerpt

  16. Proceedings: Second Annual Pacific Northwest Alternative and Renewable Energy Resources Conference.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1980-01-01

    Papers presented at the conference are published in this volume. The purpose of the conference was to solicit regional cooperation in the promoting of near-term development of such alternative and renewable energy resources in the Pacific Northwest as: cogeneration; biomass; wind; small hydro; solar end-use applications; and geothermal direct heat utilization. Separate abstracts of selected papers were prepared for inclusion in the Energy Data Base.

  17. BPA Facts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comesmore » from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability« less

  18. Summaries of Minnehaha Creek Watershed District Plans/Studies/Reports

    DTIC Science & Technology

    2004-01-30

    34+ Management of all wetland functional assessment data in a Microsoft Access© database "+ Development of a GIS wetland data management system "+ Recommendations...General Task B Design GIS -Based Decision Making Model: Scenario-Based $125,000 $125,000 Model of Landuse Hydro Data Monitoring Task C Water Quality...Landuse and Land cover data + Watershed GIS data layers + Flood Insurance Rate Maps + Proposed project locations + Stream miles, reaches and conditions

  19. Cylinder expansion test and gas gun experiment comparison

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrier, Danielle

    This is a summer internship presentation by the Hydro Working Group at Los Alamos National Laboratory (LANL) and goes into detail about their cylinder expansion test and gas gun experiment comparison. Specifically, the gas gun experiment is detailed along with applications, the cylinder expansion test is detailed along with applications, there is a comparison of the methods with pros and cons and limitations listed, the summer project is detailed, and future work is talked about.

  20. Industry sector analysis: The market for renewable energy resources (the Philippines). Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cannon, E.; Miranda, A.L.

    1990-08-01

    The market survey covers the renewable energy resources market in the Philippines. Sub-sectors covered include biomass, solar energy, photovoltaic cells, windmills, and mini-hydro systems. The analysis contains statistical and narrative information on projected market demand, end-users; receptivity of Philippine consumers to U.S. products; the competitive situation, and market access (tariffs, non-tariff barriers, standards, taxes, distribution channels). It also contains key contact information.

Top