Sample records for small reclamation projects

  1. Will the Family Farm Survive in America? Part 1: Federal Reclamation Policy (Westlands Water District). Joint Hearings Before the Select Committee on Small Business and the Committee on Interior and Insular Affairs, U.S. Senate, 94th Congress, 1st Session (July 17 and 22, 1975).

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Interior and Insular Affairs.

    The national reclamation program was to encourage people to settle on the land, to enable them to own the land they farmed, and to spread the benefit of subsidized irrigation water to as many independent farm families as possible. The San Luis Unit of the Central Valley Project, the largest pumped water diversion and water storage project, was…

  2. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  3. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  4. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  5. Prioritizing abandoned coal mine reclamation projects within the contiguous United States using geographic information system extrapolation.

    PubMed

    Gorokhovich, Yuri; Reid, Matthew; Mignone, Erica; Voros, Andrew

    2003-10-01

    Coal mine reclamation projects are very expensive and require coordination of local and federal agencies to identify resources for the most economic way of reclaiming mined land. Location of resources for mine reclamation is a spatial problem. This article presents a methodology that allows the combination of spatial data on resources for the coal mine reclamation and uses GIS analysis to develop a priority list of potential mine reclamation sites within contiguous United States using the method of extrapolation. The extrapolation method in this study was based on the Bark Camp reclamation project. The mine reclamation project at Bark Camp, Pennsylvania, USA, provided an example of the beneficial use of fly ash and dredged material to reclaim 402,600 sq mi of a mine abandoned in the 1980s. Railroads provided transportation of dredged material and fly ash to the site. Therefore, four spatial elements contributed to the reclamation project at Bark Camp: dredged material, abandoned mines, fly ash sources, and railroads. Using spatial distribution of these data in the contiguous United States, it was possible to utilize GIS analysis to prioritize areas where reclamation projects similar to Bark Camp are feasible. GIS analysis identified unique occurrences of all four spatial elements used in the Bark Camp case for each 1 km of the United States territory within 20, 40, 60, 80, and 100 km radii from abandoned mines. The results showed the number of abandoned mines for each state and identified their locations. The federal or state governments can use these results in mine reclamation planning.

  6. Reclamation and the Red Man: Relationships on the Truckee-Carson Project, Nevada

    ERIC Educational Resources Information Center

    Townley, John M.

    1978-01-01

    Four years after selection of the Western Nevada area for development as a federally-administered reclamation project, and but a single full season of farming, the Indian situation had assumed problem proportions to the Reclamation Service and the Truckee-Carson Project. (NQ)

  7. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA AGENCY: Bureau of Reclamation, Interior... Fish Passage Facilities and Fish Reintroduction Project. SUMMARY: The Bureau of Reclamation...

  8. 75 FR 15458 - Request for Small Reclamation Projects Act Loan To Construct Narrows Dam in Sanpete County, UT

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... construction by SWCD of the proposed Narrows Dam and reservoir, a non-Federal project to be located on... conditions in the affected areas without further development and assumes that irrigation operations would... construction of the 17,000 acre-foot Narrows Dam and reservoir on Gooseberry Creek, pipelines to deliver the...

  9. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  10. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  11. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water supply project in § 404.2; and (b) Be located in a Reclamation State, as defined in § 404.2. ...

  12. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  13. 75 FR 877 - Cancellation of the South Valley Facilities Expansion Project-Clark County, NV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... DEPARTMENT OF INTERIOR Bureau of Reclamation Cancellation of the South Valley Facilities Expansion Project-- Clark County, NV AGENCY: Bureau of Reclamation, Interior. ACTION: Cancellation of Notice of Intent to prepare the Environmental Impact Statement. SUMMARY: The Bureau of Reclamation, together with...

  14. RECLAMATION OF TOXIC MINE WASTE UTILIZING SEWAGE SLUDGE CONTRARY CREEK DEMONSTRATION PROJECT

    EPA Science Inventory

    Three abandoned pyrite mines in central Virginia that had been inactive since 1923 contained about 12 denuded ha and caused severe acid mine drainage (AMD) in a small stream known as Contrary Creek. The AMD included heavy metals and rendered the stream virtually void of aquatic l...

  15. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  16. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  17. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  18. 43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...

  19. 75 FR 60804 - Nimbus Hatchery Fish Passage Project, Lower American River, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Nimbus Hatchery Fish Passage Project, Lower... Act (CEQA), the Bureau of Reclamation, the lead Federal agency, and the California Department of Fish... Draft EIS/EIR for the Nimbus Hatchery Fish Passage Project (Project). The purpose of the Project is to...

  20. Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtis, Taylor L.; Levine, Aaron L.; McLaughlin, Kathleen

    This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potentialmore » at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.« less

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation,more » soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.« less

  2. 77 FR 65403 - Public Land Order No. 7804; Partial Revocation of a Secretarial Order Dated December 4, 1909; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... Secretarial Order insofar as it affects 78.69 acres of National Forest System land withdrawn on behalf of the Bureau of Reclamation for the Payette Boise Reclamation Project within the Boise National Forest. This... Payette Boise Reclamation Project within the Boise National Forest is no longer used for the purpose for...

  3. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  4. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  5. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  6. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  7. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  8. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  9. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  10. 43 CFR 404.17 - How will Reclamation evaluate my statement of interest?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.17... proposed rural water supply project is eligible for further consideration through a full proposal; (b) If...

  11. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...

  12. 76 FR 18581 - Correction; Central Valley Project Improvement Act, Standard Criteria for Agricultural and Urban...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Correction; Central Valley Project Improvement Act, Standard Criteria for Agricultural and Urban Water Management Plans AGENCY: Bureau of Reclamation... notice in the Federal Register at 76 FR 16818 on the Central Valley Project Improvement Act Standard...

  13. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49... project be authorized for construction? In reviewing a feasibility study, Reclamation will assure that the... alternative is clearly supported by the feasibility study, based on application of the following factors...

  14. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determine whether to recommend that a proposed rural water supply project be authorized for construction... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply...

  15. PERFORMANCE DEMONSTRATIONS OF ALTERNATIVE SCREEN RECLAMATION PRODUCTS FOR SCREEN PRINTING

    EPA Science Inventory

    This project evaluated environmentally-preferable products for the screen reclamation process In screen printing during month-long demonstrations at 23 printing facilities nationwide. hrough the Environmental Protection Agency (EPA) Design for the Environment Printing Project, pr...

  16. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7...

  17. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., professional law enforcement program on Reclamation project facilities, and to protect Federal project lands... Federal laws, regulations, and policies of the Department; (d) To ensure that approved standards are... criminal and intelligence information with other Federal, State, local, and tribal agencies, as appropriate...

  18. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., professional law enforcement program on Reclamation project facilities, and to protect Federal project lands... Federal laws, regulations, and policies of the Department; (d) To ensure that approved standards are... criminal and intelligence information with other Federal, State, local, and tribal agencies, as appropriate...

  19. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction? 404.49 Section 404.49 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURA...

  20. 75 FR 69698 - Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...

  1. 43 CFR 404.56 - If a financial assistance agreement is entered into for a rural water supply project that...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... entered into for a rural water supply project that benefits more than one Indian tribe, is the approval of... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.56 If a financial assistance agreement is entered into for a rural water supply project that...

  2. 43 CFR 404.11 - What type of assistance is available under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.11 What type of assistance is available under the program? Under the Reclamation Rural Water Supply... rural water supply project for you, with your cooperation; (b) Request funding through a grant or...

  3. 77 FR 33766 - Agency Information Collection Activities; Renewal of a Currently Approved Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Agency Information Collection Activities; Renewal... Reclamation, Interior. ACTION: Notice of renewal and request for comments. SUMMARY: The Bureau of Reclamation... tribal organizations, to plan the design and construction of projects to serve rural areas with...

  4. 77 FR 11585 - Notice of Availability of the Aspinall Unit Operations Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Operations Final Environmental Impact Statement, Wayne N. Aspinall Unit, Colorado River Storage Project... SUMMARY: The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the... Aspinall Unit operations, Gunnison and Montrose Counties, Colorado. DATES: Reclamation will not make a...

  5. Relating Climate Change Risks to Water Supply Planning Assumptions: Recent Applications by the U.S. Bureau of Reclamation (Invited)

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.

    2009-12-01

    Presentation highlights recent methods carried by Reclamation to incorporate climate change and variability information into water supply assumptions for longer-term planning. Presentation also highlights limitations of these methods, and possible method adjustments that might be made to address these limitations. Reclamation was established more than one hundred years ago with a mission centered on the construction of irrigation and hydropower projects in the Western United States. Reclamation’s mission has evolved since its creation to include other activities, including municipal and industrial water supply projects, ecosystem restoration, and the protection and management of water supplies. Reclamation continues to explore ways to better address mission objectives, often considering proposals to develop new infrastructure and/or modify long-term criteria for operations. Such studies typically feature operations analysis to disclose benefits and effects of a given proposal, which are sensitive to assumptions made about future water supplies, water demands, and operating constraints. Development of these assumptions requires consideration to more fundamental future drivers such as land use, demographics, and climate. On the matter of establishing planning assumptions for water supplies under climate change, Reclamation has applied several methods. This presentation highlights two activities where the first focuses on potential changes in hydroclimate frequencies and the second focuses on potential changes in hydroclimate period-statistics. The first activity took place in the Colorado River Basin where there was interest in the interarrival possibilities of drought and surplus events of varying severity relevant to proposals on new criteria for handling lower basin shortages. The second activity occurred in California’s Central Valley where stakeholders were interested in how projected climate change possibilities translated into changes in hydrologic and water supply statistics relevant to a long-term federal Endangered Species Act consultation. Projected climate change possibilities were characterized by surveying a large ensemble of climate projections for change in period climate-statistics and then selecting a small set of projections featuring a bracketing set of period-changes relative to the those from the complete ensemble. Although both methods served the needs of their respective planning activities, each has limited applicability for other planning activities. First, each method addresses only one climate change aspect and not the other. Some planning activities may need to consider potential changes in both period-statistics and frequencies. Second, neither method addresses CMIP3 projected changes in climate variability. The first method bases frequency possibilities on historical information while the second method only surveys CMIP3 projections for change in period-mean and then superimposes those changes on historical variability. Third, artifacts of CMIP3 design lead to interpretation challenges when implementing the second method (e.g., inconsistent projection initialization, model-dependent expressions of multi-decadal variability). Presentation summarizes these issues and also potential method adjustments to address them when defining planning assumptions for water supplies.

  6. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water... description of project alternatives that may be considered in the investigation, including: (1) Water supply...

  7. 30 CFR 750.13 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 750.13 Section 750.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR INDIAN LANDS PROGRAM REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS...

  8. Facility-Scale Solar Photovoltaic Guidebook: Bureau of Reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kiatreungwattana, Kosol; VanGeet, Otto; Stoltenberg, Blaise

    2016-09-01

    This guidebook was written for the U.S. Bureau of Reclamation to explore the use of non-hydro renewable energy resources to meet the U.S. Department of Interior's objectives and Reclamation's mission. This guidebook presents readers with the processes and steps needed to assess and successfully implement facility-scale solar projects.

  9. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunities for water conservation through structural or non-structural approaches and demonstration... determine whether to recommend that a proposed rural water supply project be authorized for construction... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49...

  10. Construction monitoring of full-depth reclamation in Madison County for MDOT project No. NH-0008-03(032).

    DOT National Transportation Integrated Search

    2011-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  11. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Gold, Assistant Regional Director, Upper Colorado Region. [FR Doc. 2010-13149 Filed 6-1-10; 8:45 am..., Dallas Creek Project, Colorado AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of intent to..., Area Manager, Western Colorado Area Office, Bureau of Reclamation, 2764 Compass Drive, Suite 106, Grand...

  12. Construction monitoring of full-depth reclamation in Madison County for MDOT project no. NH-0008-03(032).

    DOT National Transportation Integrated Search

    2010-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  13. Construction monitoring of full-depth reclamation in Madison County for MDOT project no. NH-0008-03(032)

    DOT National Transportation Integrated Search

    2010-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  14. Hydrogeochemical analysis and evaluation of groundwater in the reclaimed small basin of Abu Mina, Egypt

    NASA Astrophysics Data System (ADS)

    Salem, Zenhom E.; Atwia, Mohamed G.; El-Horiny, Mohamed M.

    2015-12-01

    Agricultural reclamation activities during the last few decades in the Western Nile Delta have led to great changes in the groundwater levels and quality. In Egypt, changing the desert land into agricultural land has been done using transferred Nile water (through irrigation canal systems) or/and groundwater. This research investigates the hydrogeochemical changes accompanying the reclamation processes in the small basin of Abu Mina, which is part of the Western Nile Delta region. In summer 2008, 23 groundwater samples were collected and groundwater levels were measured in 40 observation wells. Comparing the groundwater data of the pre-reclamation (1974) and the post-reclamation (2008) periods, groundwater seems to have been subjected to many changes: rise in water level, modification of the flow system, improvement of water quality, and addition of new salts through dissolution processes. Generally, Abu Mina basin is subdivided into two areas, recharge and discharge. The dissolution and mixing were recognized in the recharge areas, while the groundwater of the discharge region carries the signature of the diluted pre-reclamation groundwater. The salts of soil and aquifer deposits play an important role in the salt content of the post and pre-reclamation groundwater. NaCl was the predominant water type in the pre-reclamation groundwater, while CaSO4, NaCl and MgSO4 are the common chemical facies in the post-reclamation groundwater. The post-reclamation groundwater mostly indicates mixing between the pre-reclamation groundwater and the infiltrated freshwater with addition of some ions due to interaction with soil and sediments.

  15. 43 CFR 404.28 - Is it possible to expedite the completion of an appraisal investigation or feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... served by a proposed rural water supply project has urgent and compelling water needs, Reclamation will... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.28 Is it possible to expedite the completion of an appraisal investigation...

  16. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  17. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  18. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  19. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  20. 78 FR 54910 - Notice of Intent To Prepare an Environmental Impact Statement and Public Scoping Meetings for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1523-2000-229-00-0-1, 3205000] Notice of... Apache Tribe Rural Water System Project, Arizona AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... Act of 2010), the United States Congress authorized and directed Reclamation to plan, design, and...

  1. Mining and Reclamation Cooperative Education Program. Progress Report.

    ERIC Educational Resources Information Center

    Barnett, Carl D.

    The exemplary project was the cooperative effort of two schools in the western Kentucky coal fields to field test a program in mining and reclamation technology. Covering the first year of the project, the report describes the problem and scope of the study, the objectives pursued, the methodology, and the results obtained. The goal of the project…

  2. Monitoring and analysis of coastal reclamation from 1995-2015 in Tianjin Binhai New Area, China.

    PubMed

    Chen, Wengang; Wang, Dongchuan; Huang, Yong; Chen, Liding; Zhang, Lihui; Wei, Xiangwang; Sang, Mengqin; Wang, Feicui; Liu, Jinya; Hu, Bingxu

    2017-06-20

    Increasing coastal reclamation activities have been undertaken to solve the conflict between people and land resources, creating significant challenges for coordinating coastal reclamation, economic development and environmental protection. This paper analyzes the effects of coast reclamation on Gross Domestic Product growth and the quality of inshore seawater in the Tianjin Binhai New Area. Remote sensing and a Geographic Information System were used to extract the information of coastal reclamation. The correlation between the area of coastal reclamation, GDP growth and the quality of inshore seawater was analyzed and a decoupling elasticity model was used to explore trends in the relationship between economic development and coastal reclamation. Results showed that coastal reclamation activities played an important role in promoting economic development, but greatly damaged the ecological environment. Although the relationship between coastal reclamation and economic development has weakened during the last three periods, the influence on the environment will continue because of the cumulative effects of pollution. To maintain a balance between coastal reclamation, economic development and environmental protection, (1) coastal reclamation planning must address both economic and environmental outcomes; (2) environmental deficiencies from existing coastal reclamation projects must be rectified; and (3) the legal system regulating coastal reclamation needs to be refined and strengthened.

  3. 43 CFR 404.59 - If the Secretary recommends a project for construction, is that a promise of Federal funding?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false If the Secretary recommends a project for construction, is that a promise of Federal funding? 404.59 Section 404.59 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  4. Field and laboratory investigations for full depth reclamation projects.

    DOT National Transportation Integrated Search

    2011-03-01

    Full-depth reclamation (FDR) offers a timely, cost-effective solution to restore a pavements condition. : However, FDR represents only one technique in the engineers toolkit available for addressing deteriorating : pavement conditions. The purp...

  5. Hydrologic evaluation of salinity control and reclamation projects in the Indus Plain, Pakistan--A summary

    USGS Publications Warehouse

    Mundorff, Maurice John; Carrigan, P.H.; Steele, T.D.; Randall, A.D.

    1976-01-01

    This report summarizes the observations and findings of a team of four specialists from the U.S. Geological Survey assigned to Pakistan under the auspices of the U.S. Agency for International Development during May to August 1972 for a hydrologic evaluation of Salinity Control and Reclamation Projects in the Indus Plain Individual members of the team undertook comprehensive studies related to climatology, surface-water hydrology, and the canal system; streamflow and sediment yields of the rivers; computer applications to hydrologic data; aquifer characteristics; hydrologic evaluation of Salinity Control and Reclamation Projects (SCARPs); tubewell performance; hydrology of shallow versus deep tubewells; well and well-screen design in the Indus Plain; evaluation of observed and anticipated trends in both private and public tubewell development; evaluation of water-quality programs, data analysis, and records, and computer coding of special water-quality data; and evaluation of water-level data, well discharge and specific-capacity tests and aquifer tests. The reclamation program, by pumping from tubewells, has been notably successful in lowering the water table, in providing supplemental water for irrigation and for leaching of salinized soils, and in improving crop production. Some changes in water quality have been observed in SCARP-I and the Mona Scheme of SCARP-II, but these have not as yet (1972) significantly affected the utility of the water for irrigation. Problems associated with reclamation include control of deterioration in performance of tubewells and their rehabilitation, local brackish or saline-water encroachment, and maintenance of a favorable salt balance in the ground-water system. Rapid and as yet (1972) unregulated growth of shallow private tubewell development in the past decade has introduced complicating factors to the reclamation planning of the early 1960's which had emphasized public tubewell development through the SCARP program. In comparing shallow (0-200 feet) with deep (200-400 feet} tubewell development, it is concluded that long-term response of the water table is the same, whether many shallow wells of small capacity or fewer deeper wells of large capacity pump the same total volume of water in the same area. Moreover, it is concluded that there is no definite advantage for either type of pumping regime with respect to water quality. Utilization of the Punjab aquifer could be greatly enhanced by recharge of high-quality water diverted from the Chenab and Jhelum Rivers to the Ravi and Sutlej Rivers by way of the link and irrigation canals during periods of surplus flow. Recharge to the aquifer could also be improved by diversion of high-quality water from the Chenab and the Jhelum to natural nalas and other surface drainageways during periods of surplus flow. Such recharge would be of much better quality than water leaching downward from irrigated fields. Continued monitoring of the hydrologic system and research on problems engendered by reclamation are essential to the viability of the SCARP program and related water-resources development in the Indus River Basin.

  6. Groundwater levels, trends, and relations to pumping in the Bureau of Reclamation Klamath Project, Oregon and California

    USGS Publications Warehouse

    Gannett, Marshall W.; Breen, Katherine H.

    2015-07-28

    The use of groundwater to supplement surface-water supplies for the Bureau of Reclamation Klamath Project in the upper Klamath Basin of Oregon and California markedly increased between 2000 and 2014. Pre-2001 groundwater pumping in the area where most of this increase occurred is estimated to have been about 28,600 acre-feet per year. Subsequent supplemental pumping rates have been as high as 128,740 acre-feet per year. During this period of increased pumping, groundwater levels in and around the Bureau of Reclamation Klamath Project have declined by about 20-25 feet. Water-level declines are largely due to the increased supplemental pumping, but other factors include increased pumping adjacent to the Klamath Project and drying climate conditions. This report summarizes the distribution and magnitude of supplemental groundwater pumping and groundwater-level declines, and characterizes the relation between the stress and response in subareas of the Klamath Project to aid decision makers in developing groundwater-management strategies.

  7. 43 CFR 404.54 - Who will hold title to a rural water project that is constructed following the completion of an...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.54 Who will hold title to a rural water project that is constructed following the completion of an... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who will hold title to a rural water...

  8. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.58 Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with...

  9. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are proposed projects under the Rural Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.51...

  10. Modeling the temporal dynamics of intertidal benthic infauna biomass with environmental factors: Impact assessment of land reclamation.

    PubMed

    Yang, Ye; Chui, Ting Fong May; Shen, Ping Ping; Yang, Yang; Gu, Ji Dong

    2018-03-15

    Anthropogenic activities such as land reclamation are threatening tidal marshes worldwide. This study's hypothesis is that land reclamation in a semi-enclosed bay alters the seasonal dynamics of intertidal benthic infauna, which is a key component in the tidal marsh ecosystem. Mai Po Tidal Marsh, Deep Bay, Pearl River Estuary, China was used as a case study to evaluate the hypothesis. Ecological models that simulate benthic biomass dynamics with governing environmental factors were developed, and various scenario experiments were conducted to evaluate the impact of reclamations. Environmental variables, selected from the areas of hydrodynamics, meteorology, and water quality based on correlation analysis, were used to generate Bayesian regression models for biomass prediction. The best-performing model, which considered average water age (i.e., a hydrodynamic indicator of estuarine circulation) in the previous month, salinity variation (i.e., standard deviation of salinity), and the total sunny period in the current month, captured well both seasonal and yearly trends in the benthic infauna observations from 2002 to 2008. This model was then used to simulate biomass dynamics with varying inputs of water age and salinity variation from coastal numerical models of different reclamation scenarios. The simulation results suggest that the reclamation in 2007 decreased the spatial and annual average benthic infauna biomass in the tidal marsh by 20%, which agreed with the 28% biomass decrease recorded by field survey. The range of biomass seasonal variation also decreased significantly from 2.1 to 230.5g/m 2 (without any reclamation) to 1.2 to 131.1g/m 2 (after the 2007 reclamation), which further demonstrates the substantial ecological impact of reclamation. The ecological model developed in this study could simulate seasonal biomass dynamics and evaluate the ecological impact of reclamation projects. It can therefore be applied to evaluate the ecological impact of coastal engineering projects for tidal marsh management, conservation, and restoration. Copyright © 2017 Elsevier B.V. All rights reserved.

  11. WILLOW CREEK RECLAMATION PROJECT

    EPA Science Inventory

    Working in cooperation with the EPA, Colorado Division of Minerals and Geology, and others, the Willow Creek Reclamation Committee (WCRC) will investigate the sources and character of water entering the mine workings on the Amethyst vein near the town of Creede, Colorado. Activi...

  12. Development assessment of wash water reclamation

    NASA Technical Reports Server (NTRS)

    Putnam, D. F.

    1976-01-01

    An analytical study assessment of state-of-the-art wash water reclamation technology is presented. It covers all non-phase-change unit operations, unit processes and subsystems currently under development by NASA. Each approach to wash water reclamation is described in detail. Performance data are given together with the projected weights and sizes of key components and subsystems. It is concluded that a simple multifiltration subsystem composed of surface-type cartridge filters, carbon adsorption and ion exchange resins is the most attractive approach for spacecraft wash water reclamation in earth orbital missions of up to 10 years in duration.

  13. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  14. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  15. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  16. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  17. 75 FR 12562 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... DEPARTMENT OF THE INTERIOR THE UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION Central...-- Water and Science; Utah Reclamation Mitigation and Conservation Commission; and the Central Utah Water... of Public Scoping for the proposed Provo River Delta Restoration, Utah County, Utah. SUMMARY...

  18. 43 CFR 404.29 - Can the level of effort needed to complete an appraisal investigation or feasibility study be...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview... the total size, cost, and complexity of the proposed rural water supply project in order to reduce the...

  19. Effects of surface coal mining and reclamation on the geohydrology of six small watersheds in West-Central Indiana

    USGS Publications Warehouse

    Martin, Jeffrey D.; Duwelius, Richard F.; Crawford, Charles G.

    1990-01-01

    Hydrologic effects of mining and reclamation were identified by comparing the hydrologic systems at mined and reclaimed watersheds with those at unmined agricultural watersheds. The presence or absence of a large final-cut lake in the reclaimed watershed greatly influences the hydrologic systems and the effects of mining and reclamation. Surface coal mining and reclamation can decrease base flow, annual runoff, and peak flow rates; increase the variability of flow and recharge to the bedrock; reestablish the premining relation between surface- and ground-water divides; and lower the water table in upland areas.

  20. Land Creation in the Pearl River Delta, Macau's Case

    NASA Astrophysics Data System (ADS)

    Balsas, C.

    2016-02-01

    Macau has a long tradition of reclaiming land to the Pearl River. In approximately 100 years, the territory more than doubled its landmass from 11.6 square kilometer in 1912 to its current area of about 29 square kilometer. The latest reclamation phase plans to add another 3.5 square kilometer to the territory in five designated areas along the Peninsula's northeastern shore and Taipa's coastline. These projects continue the most emblematic land reclamation projects built during the last decades of the Portuguese administration. Landfill-based expansion has provided the substrate needed to urbanize the territory and enable its continuous growth. This paper examines the context and potential impacts of the most recent land reclamation projects, the first under PRC's jurisdiction. The neoliberal expansionist policies of the last decade have turned Macau in the gambling and entertainment hub of Asia. I argue that nature's uncontrollable forces and the idiosyncrasies of anticipatory planning may change the path (or at least the borders) of the territory, if climate change and sea level rise phenomena are not properly accommodated in the physical designs and long-range regional governance strategies for the Pearl River Delta estuary. The paper utilizes a climate change adaptation and mitigation framework to analyze future territorial impacts on the hydrographic-terrestrial interface. This paper continues a line of research, which started in the late 1990s and culminated with the publication of two research papers: Balsas, C. (1999) Macau: A Story of Land Reclamation. Portuguese Studies Review, 7(2): 80-92 and Balsas, C. (2000) Developing a Transport Infrastructure in a Context of Political Change, the Example of Macau. Third World Planning Review, 22(3): 261-288. The paper attempts to place the most recent land reclamation efforts in the context of other waterfront expansion and regeneration projects in southeastern Asian cities.

  1. Evaluation of Effectiveness and Cost-Benefits of Woolen Roadside Reclamation Products : Implementation Report

    DOT National Transportation Integrated Search

    2017-12-01

    The research project started by reviewing sixteen existing wool products that might be readily adapted for roadside reclamation uses. None of these products showed promise either due to the difficulty in importing them to the U.S., or as a result of ...

  2. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  3. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  4. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  5. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  6. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  7. Recycling: Establishing a Citizen-Sponsored Reclamation Center.

    ERIC Educational Resources Information Center

    Keep America Beautiful, Inc., New York, NY.

    This booklet applies the Clean Community System (CCS) of Keep America Beautiful, Inc. to the development of citizen-sponsored recycling projects. Six initial steps in establishing a reclamation center are given and include information gathering, market analysis, legal requirements, and site location. Suggestions are included for recruiting staff…

  8. Landscape ecological security response to land use change in the tidal flat reclamation zone, China.

    PubMed

    Zhang, Runsen; Pu, Lijie; Li, Jianguo; Zhang, Jing; Xu, Yan

    2016-01-01

    As coastal development becomes a national strategy in Eastern China, land use and landscape patterns have been affected by reclamation projects. In this study, taking Rudong County, China as a typical area, we analyzed land use change and its landscape ecological security responses in the tidal flat reclamation zone. The results show that land use change in the tidal flat reclamation zone is characterized by the replacement of natural tidal flat with agricultural and construction land, which has also led to a big change in landscape patterns. We built a landscape ecological security evaluation system, which consists of landscape interference degree and landscape fragile degree, and then calculated the landscape ecological security change in the tidal flat reclamation zone from 1990 to 2008 to depict the life cycle in tidal flat reclamation. Landscape ecological security exhibited a W-shaped periodicity, including the juvenile stage, growth stage, and maturation stage. Life-cycle analysis demonstrates that 37 years is required for the land use system to transform from a natural ecosystem to an artificial ecosystem in the tidal flat reclamation zone.

  9. 78 FR 21969 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, Denver... for the delivery of project water for authorized uses in newspapers of general circulation in the...

  10. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; (2) Water demand management alternatives (e.g., water conservation and other approaches to reduce... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water...

  11. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; (2) Water demand management alternatives (e.g., water conservation and other approaches to reduce... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water...

  12. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; (2) Water demand management alternatives (e.g., water conservation and other approaches to reduce... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water...

  13. 43 CFR 402.6 - Price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Price. 402.6 Section 402.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.6 Price. The price of land sold under this...

  14. 30 CFR 874.14 - Water supply restoration.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Water supply restoration. 874.14 Section 874.14... ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.14 Water supply restoration. (a) Any... supply restoration projects. For purposes of this section, “water supply restoration projects” are those...

  15. Reclamation: what about trees

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolar, C.A.; Ashby, W.C.

    A five-year research programme was started in 1978 in the Botany Department of Southern Illinois University to evaluate the effect of reclamation practices on tree survival and growth. The project was initiated as a direct result of reports from Illinois and Indiana of tree-planting failures on mined lands reclaimed to current regulation standards.

  16. Landscape management in an area affected by surface brown coal mining

    NASA Astrophysics Data System (ADS)

    Vráblíková, J.; Wildová, E.; Vráblík, P.; Blažková, M.

    2017-10-01

    The contribution summarizes results of a project concentrated on landscape management of an area affected by brown coal mining located in northern Bohemia (The Most basin) focusing on restoration and reclamation processes. It describes in particular the shares of individual types of reclamations in the area of interest. A strategic document that also supports landscape restoration in anthropogenically burdened regions was written within the project called “Restart” and the second part of the contribution is focused on its chapters which address this issue.

  17. U.S. Army Corps of Engineers Recreation Study. A Plan Prepared for the Assistant Secretary of the Army (Civil Works). Volume 1. Main Report

    DTIC Science & Technology

    1990-09-01

    It was viewed as leading to the public expenditure of funds which contributed mainly to the benefit of private landowners whose properties abutted...to the water’s edge. Thus, a new and rather unique "public" benefitted by Corps projects evolved. Facilities, including private boat houses...afforded by Reclamation reservoirs were initially incidental benefits , but the growing popularity of Reclamation’s reservoirs soon resulted in project

  18. Quantification of intensive hybrid coastal reclamation for revealing its impacts on macrozoobenthos

    NASA Astrophysics Data System (ADS)

    Yan, Jiaguo; Cui, Baoshan; Zheng, Jingjing; Xie, Tian; Wang, Qing; Li, Shanze

    2015-01-01

    Managing and identifying the sources of anthropogenic stress in coastal wetlands requires an in-depth understanding of relationships between species diversity and human activities. Empirical and experimental studies provide clear evidence that coastal reclamation can have profound impacts on marine organisms, but the focus of such studies is generally on comparative or laboratory research. We developed a compound intensity index (reclamation intensity index, RI) on hybrid coastal reclamation, to quantify the impacts of reclamation on coastal ecosystems. We also made use of mean annual absolute changes to a number of biotic variables (biodiversity, species richness, biomass of total macrozoobenthos, and species richness and biomass of Polychaeta, Mollusca, Crustacea, and Echinodermata) to determine Hedges’d index, which is a measure of the potential effects of coastal reclamation. Our results showed that there was significant difference of coastal reclamation intensity between Yellow Sea, East China Sea and South China Sea, the biological changes in effect sizes of the three regions differed greatly over time. Our modelling analyses showed that hybrid coastal reclamation generally had significant negative impacts on species diversity and biomass of macrozoobenthos. These relationships varied among different taxonomic groups and included both linear and nonlinear relationships. The results indicated that a high-intensity of coastal reclamation contributed to a pronounced decline in species diversity and biomass, while lower-intensity reclamation, or reclamation within certain thresholds, resulted in a small increase in species diversity and biomass. These results have important implications for biodiversity conservation and the ecological restoration of coastal wetlands in face of the intensive reclamation activities.

  19. The application of satellite data in monitoring strip mines

    NASA Technical Reports Server (NTRS)

    Sharber, L. A.; Shahrokhi, F.

    1977-01-01

    Strip mines in the New River Drainage Basin of Tennessee were studied through use of Landsat-1 imagery and aircraft photography. A multilevel analysis, involving conventional photo interpretation techniques, densitometric methods, multispectral analysis and statistical testing was applied to the data. The Landsat imagery proved adequate for monitoring large-scale change resulting from active mining and land-reclamation projects. However, the spatial resolution of the satellite imagery rendered it inadequate for assessment of many smaller strip mines, in the region which may be as small as a few hectares.

  20. Tree planting experiences in the eastern interior coal province

    Treesearch

    Charles Medvick

    1980-01-01

    Fruit trees were planted successfully in 1918 and organized afforestation began in 1928. Professional foresters had a hand in some of the very earliest planting projects. Formal reclamation research played an important role in applying science to early reclamation technology; however, considerable work has preceded the scientists. Some success has been experienced with...

  1. 78 FR 35314 - Availability of Final Environmental Impact Statement; Bunker Hill Groundwater Basin, Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1999-6000-100-00-0-0-3, 3501000] Availability of Final Environmental Impact Statement; Bunker Hill Groundwater Basin, Riverside-Corona Feeder... proposed Riverside-Corona Feeder Project. DATES: The Bureau of Reclamation will not make a decision on the...

  2. 43 CFR 2524.8 - Cancellation of entries for nonpayment of water-right charges.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.8 Cancellation of entries for nonpayment of water-right charges. All homestead and desert-land entrymen holding land under the reclamation law...

  3. 43 CFR 2524.8 - Cancellation of entries for nonpayment of water-right charges.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.8 Cancellation of entries for nonpayment of water-right charges. All homestead and desert-land entrymen holding land under the reclamation law...

  4. 43 CFR 2524.8 - Cancellation of entries for nonpayment of water-right charges.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.8 Cancellation of entries for nonpayment of water-right charges. All homestead and desert-land entrymen holding land under the reclamation law...

  5. 77 FR 45653 - Yakima River Basin Conservation Advisory Group; Yakima River Basin Water Enhancement Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... 4 p.m. ADDRESSES: The meeting will be held at the Bureau of Reclamation, Yakima Field Office, 1917... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Yakima River Basin Conservation Advisory Group...: Notice of public meeting. SUMMARY: As required by the Federal Advisory Committee Act, the Yakima River...

  6. 43 CFR 429.5 - Who is authorized to issue use authorizations under this part?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... convey an interest in Reclamation land, facilities, or waterbodies. Recreation managing partners under the Federal Water Projects Recreation Act, 16 U.S.C. 4601 et seq., and water user organizations who... partner or water user organization is authorized to do so under its contract with Reclamation; (b) Such...

  7. 43 CFR 422.5 - Responsibilities of the Law Enforcement Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Responsibilities of the Law Enforcement Administrator. 422.5 Section 422.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS Responsibilities § 422.5 Responsibilities of...

  8. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff,more » served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.« less

  9. Hydrologic analyses in support of the Navajo Generating Station–Kayenta Mine Complex environmental impact statement

    USGS Publications Warehouse

    Leake, Stanley A.; Macy, Jamie P.; Truini, Margot

    2016-06-01

    IntroductionThe U.S. Department of Interior’s Bureau of Reclamation, Lower Colorado Region (Reclamation) is preparing an environmental impact statement (EIS) for the Navajo Generating Station-Kayenta Mine Complex Project (NGS-KMC Project). The proposed project involves various Federal approvals that would facilitate continued operation of the Navajo Generating Station (NGS) from December 23, 2019 through 2044, and continued operation of the Kayenta Mine and support facilities (collectively called the Kayenta Mine Complex, or KMC) to supply coal to the NGS for this operational period. The EIS will consider several project alternatives that are likely to produce different effects on the Navajo (N) aquifer; the N aquifer is the principal water resource in the Black Mesa area used by the Navajo Nation, Hopi Tribe, and Peabody Western Coal Company (PWCC).The N aquifer is composed of three hydraulically connected formations—the Navajo Sandstone, the Kayenta Formation, and the Lukachukai Member of the Wingate Sandstone—that function as a single aquifer. The N aquifer is confined under most of Black Mesa, and the overlying stratigraphy limits recharge to this part of the aquifer. The N aquifer is unconfined in areas surrounding Black Mesa, and most recharge occurs where the Navajo Sandstone is exposed in the area near Shonto, Arizona. Overlying the N aquifer is the D aquifer, which includes the Dakota Sandstone, Morrison Formation, Entrada Sandstone, and Carmel Formation. The aquifer is named for the Dakota Sandstone, which is the primary water-bearing unit.The NGS is located near Page, Arizona on the Navajo Nation. The KMC, which delivers coal to NGS by way of a dedicated electric railroad, is located approximately 83 miles southeast of NGS (about 125 miles northeast of Flagstaff, Arizona). The Kayenta Mine permit area is located on about 44,073 acres of land leased within the boundaries of the Hopi and Navajo Indian Reservations. KMC has been conducting mining and reclamation operations within the Kayenta Mine permit boundary since 1973.The KMC part of the proposed project requires approval by the Office of Surface Mining (OSM) of a significant revision of the mine’s permit to operate in accordance with the Surface Mine Control and Reclamation Act (Public Law 95-87, 91 Stat. 445 [30 U.S.C. 1201 et seq.]). The revision will identify coal resource areas that may be used to continue extracting coal at the present rate of approximately 8.2 million tons per year. The Kayenta Mine Complex uses water pumped from the D and N aquifers beneath PWCC’s leasehold to support mining and reclamation activities. Prior to 2006, water from the PWCC well field also was used to transport coal by way of a coal-slurry pipeline to the now-closed Mohave Generating Station. Water usage at the leasehold was approximately 4,100 acre-feet per year (acre-ft/yr) during the period the pipeline was in use, and declined to an average 1,255 acre-ft/yr from 2006 to 2011. The Probable Hydrologic Consequences (PHC) section of the mining and reclamation permit must be modified to project the consequences of extended water use by the mine for the duration of the KMC part of the project, including a post-mining reclamation period.Since 1971, the U.S. Geological Survey (USGS) has conducted the Black Mesa Monitoring Program, which consists of monitoring water levels and water quality in the N aquifer, compiling information on water use by PWCC and tribal communities, maintaining several stream-gaging stations, measuring discharge at selected springs, conducting special studies, and reporting findings. These data are useful in evaluating the effects on the N aquifer from PWCC and community pumping, and the effects of variable precipitation.The EIS will assess the impacts of continued pumping on the N aquifer, including changes in storage, water quality, and effects on spring and baseflow discharge, by proposed mining through 2044, and during the reclamation process to 2057.Several groundwater models exist for the area and Reclamation concluded it would conduct a peer review of the groundwater flow model that will be used to assess the direct, reasonably foreseeable indirect, and cumulative effects of future groundwater withdrawals on the D and N aquifers in the Black Mesa area. Reclamation made this determination because of the level of controversy around the effects of continued water use and the comments received from the 2014 draft EIS scoping meetings. Reclamation requested assistance from the USGS in evaluating existing groundwater flow models of the Black Mesa Basin that can be used to predict the effects of different project alternatives on the D and N aquifers.

  10. 30 CFR 872.25 - Are there any restrictions on how OSM may use Federal expense funds?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal expense funds? 872.25 Section 872.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... jurisdiction of Indian tribes that do not have an approved abandoned mine reclamation program under section 405...) Projects authorized under section 402(g)(4) in States and on lands within the jurisdiction of Indian tribes...

  11. A bill to amend the Surface Mining Control and Reclamation Act of 1977 to clarify that uncertified States and Indian tribes have the authority to use certain payments for certain noncoal reclamation projects.

    THOMAS, 111th Congress

    Sen. Bingaman, Jeff [D-NM

    2009-12-03

    Senate - 08/05/2010 Placed on Senate Legislative Calendar under General Orders. Calendar No. 534. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  12. 43 CFR 422.6 - Responsibilities of the Chief Law Enforcement Officer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Responsibilities of the Chief Law Enforcement Officer. 422.6 Section 422.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS Responsibilities § 422.6 Responsibilities of...

  13. Application of risk management techniques for the remediation of an old mining site in Greece.

    PubMed

    Panagopoulos, I; Karayannis, A; Adam, K; Aravossis, K

    2009-05-01

    This article summarizes the project and risk management of a remediation/reclamation project in Lavrion, Greece. In Thoricos the disposal of mining and metallurgical wastes in the past resulted in the contamination with heavy metals and acid mine drainage. The objective of this reclamation project was to transform this coastal zone from a contaminated site to an area suitable for recreation purposes. A separate risk assessment study was performed to provide the basis of determining the relevant environmental contamination and to rate the alternative remedial schemes involved. The study used both existing data available from comprehensive studies, as well as newly collected field data. For considering environmental risk, the isolation and minimization of risk option was selected, and a reclamation scheme, based on environmental criteria, was applied which was comprised of in situ neutralization, stabilization and cover of the potentially acid generating wastes and contaminated soils with a low permeability geochemical barrier. Additional measures were specifically applied in the areas where highly sulphidic wastes existed constituting active acid generation sources, which included the encapsulation of wastes in HDPE liners installed on clay layers.

  14. 40 CFR 261.5 - Special requirements for hazardous waste generated by conditionally exempt small quantity...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... batteries managed under the requirements of 40 CFR part 266, subpart G; or (6) Is universal waste managed... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal...

  15. 40 CFR 261.5 - Special requirements for hazardous waste generated by conditionally exempt small quantity...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... batteries managed under the requirements of 40 CFR part 266, subpart G; or (6) Is universal waste managed... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal...

  16. 40 CFR 261.5 - Special requirements for hazardous waste generated by conditionally exempt small quantity...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... academic entity pursuant to § 262.213. For purposes of this provision, the term eligible academic entity... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal...

  17. 40 CFR 261.5 - Special requirements for hazardous waste generated by conditionally exempt small quantity...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... academic entity pursuant to § 262.213. For purposes of this provision, the term eligible academic entity... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal...

  18. 40 CFR 261.5 - Special requirements for hazardous waste generated by conditionally exempt small quantity...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... academic entity pursuant to § 262.213. For purposes of this provision, the term eligible academic entity... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal... waste prior to beneficial use or reuse, or legitimate recycling or reclamation; or (vii) For universal...

  19. 30 CFR 925.25 - Approval of Missouri abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... March 15, 1989 Organization; project selection; rights of entry; coordination of reclamation activities; land acquisition, management and disposal; database. November 29, 1994 August 24, 1995 RSMo 444.810.2 through .8; 444.915.3; 10 CSR 40-9.020(1)(D), (E), (3)(A); AML Plan § 884.13(C)(2), (D)(3), (4). March 31...

  20. 78 FR 35047 - Notice of Application for Withdrawal and Opportunity for Public Meeting; Oregon

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... to contact either of the above individuals. The FIRS is available 24 hours a day, 7 days a week, to... regular business hours, 8 a.m. to 4 p.m., Monday through Friday, except Federal holidays. Before including... mine reclamation work completed at the White King/Lucky Lass Mine reclamation project area. This notice...

  1. Forced to Abandon Their Farms: Water Deprivation and Starvation among the Gila River Pima, 1892-1904

    ERIC Educational Resources Information Center

    DeJong, David H.

    2004-01-01

    This article discusses the water problems faced by the people of the Pima tribe. On June 17, 1902, after more than a decade of political debate and maneuvering, the National Reclamation Act became law. This legislation provided direct federal subsidies for the development of irrigation projects across the arid West. The Reclamation Act generated…

  2. 76 FR 20940 - Troy Mine, Incorporated, Troy Mine Revised Reclamation Plan, Kootenai National Forest, Lincoln...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... mine. The ore is mined using the ``room-and-pillar method.'' The mine permit area covers 2,782 acres of.... Production stopped in 1993 and reinitiated in 2005 and is projected to continue for 3-5 years until the... evaluations necessary to complete design of reclamation elements that include a short-term water management...

  3. A bill to amend the Surface Mining Control and Reclamation Act of 1977 to clarify that uncertified States and Indian tribes have the authority to use certain payments for certain noncoal reclamation projects and acid mine remediation programs.

    THOMAS, 113th Congress

    Sen. Udall, Tom [D-NM

    2013-02-04

    Senate - 04/22/2013 Placed on Senate Legislative Calendar under General Orders. Calendar No. 51. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  4. 75 FR 53332 - San Carlos Irrigation Project, Arizona

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation San Carlos Irrigation Project, Arizona AGENCY..., as amended, on the rehabilitation of San Carlos Irrigation Project (SCIP) water delivery facilities... convey irrigation water from the Gila River and Central Arizona Project (CAP) to agricultural lands in...

  5. Unexpected hydrologic perturbation in an abandoned underground coal mine: Response to surface reclamation?

    USGS Publications Warehouse

    Harper, D.; Olyphant, G.A.; Hartke, E.J.

    1990-01-01

    A reclamation project at the abandoned Blackhawk Mine site near Terre Haute, Indiana, lasted about four months and involved the burial of coarse mine refuse in shallow (less than 9 m) pits excavated into loess and till in an area of about 16 ha. An abandoned flooded underground coal mine underlies the reclamation site at a depth of about 38 m; the total area underlain by the mine is about 10 km2. The potentiometric levels associated with the mine indicate a significant (2.7 m) and prolonged perturbation of the deeper confined groundwater system; 14 months after completing reclamation, the levels began to rise linearly (at an average rate of 0.85 cm/d) for 11 months, then fell exponentially for 25 months, and are now nearly stable. Prominent subsidence features exist near the reclamation site. Subsidence-related fractures were observed in cores from the site, and such fractures may have provided a connection between the shallower and deeper groundwater systems. ?? 1990 Springer-Verlag New York Inc.

  6. 43 CFR 404.8 - Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a community with greater than 50,000 inhabitants to be part of an eligible rural water supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.8 Are there any... water supply project? Yes. A town or community with a population in excess of 50,000 inhabitants may...

  7. 43 CFR 404.8 - Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... a community with greater than 50,000 inhabitants to be part of an eligible rural water supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.8 Are there any... water supply project? Yes. A town or community with a population in excess of 50,000 inhabitants may...

  8. 43 CFR 404.8 - Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... a community with greater than 50,000 inhabitants to be part of an eligible rural water supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.8 Are there any... water supply project? Yes. A town or community with a population in excess of 50,000 inhabitants may...

  9. Temporal-spatial variations and driving factors analysis of coastal reclamation in China

    NASA Astrophysics Data System (ADS)

    Meng, Weiqing; Hu, Beibei; He, Mengxuan; Liu, Baiqiao; Mo, Xunqiang; Li, Hongyuan; Wang, Zhongliang; Zhang, Yu

    2017-05-01

    Coastal reclamation is the gain of land from the sea or coastal wetlands for agricultural purposes, industrial use or port expansions. Large-scale coastal land reclamation can have adverse effects on the coastal environment, including loss of marine habitats and deterioration of coastal water quality. In recent decades, coastal land reclamation has occurred extensively to meet the increasing needs of rapid economic development and urbanization in China. The overall objective of this study is to understand the coastal reclamation status of China from 1979 to 2014 and analyzed its driving factors for mitigating negative ecological effects. The data of coastal reclamation were done with the ERDAS Imagine V9.2 platform and ArcGIS software based on remote images including Landsat, SPOT, ZY-2 and ZY-3. Potential driving factors for sea reclamation were selected based on statistics bulletins and the knowledge of experts in coastal management. In order to understand the relationships among possible impact factors and coastal reclamation, the Partial Least-Squares Regression models was constructed. The analysis results indicated that the total area of reclamation was 11162.89 km2 based on remote sensing images between 1979 and 2014. Shandong Province is the largest reclamation area, reaching 2736.54 km2, and the reclamation is mainly concentrated in Zhejiang, Jiangsu and Liaoning, where the reclamation areas were all more than 1000 km2. According to the remote sensing images, there are three coastal reclamation hotspot regions including Bohai bay (in which is located Liaoning, Tianjin and Hebei), Jiangsu province coastal area and Hangzhou bay (in Zhejiang province). A large scale land reclamation plan of more than 5880 km2 has been made by local government and 2469 km2 has approved by the State Council. From the analyzed results, there is a significant collinearity between these indicators, and no significant correlation between the area of reclamation and selected indicators. Economic development and employees in marine industries have weak positive correlation and correspondingly, the area of cultivated land (ACL) had a negative correlation. Because of the weak correlation, there is an assumption that economic development, outcome of coastal reclamation and population growth were not only was the direct driving factor, but also the outcome of coastal reclamation and population growth was not the direct driving indicator. Construction land quota and huge economic returns to local government may be the direct driving factors according to our field investigation. To resolve the contradiction between the need for land and coastal wetland conservation, it is recommended that China should establish a special management agency and coordination mechanisms, reconsidered the implementation of the reclamation plans and projects that have been approved, enhance law enforcement and increase penalties and strengthen public participation in reclamation management.

  10. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  11. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  12. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  13. 30 CFR 881.6 - Project contract.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Project contract. 881.6 Section 881.6 Mineral... LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.6 Project contract. (a) Upon approval of the project by the Secretary, execution of the cooperative agreement, and receipt of...

  14. 43 CFR 418.2 - How Project water may be used.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How Project water may be used. 418.2..., DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA General Provisions § 418.2 How Project water may be used. Project water may be delivered only to serve...

  15. 30 CFR 880.11 - Qualifications of projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ABANDONED MINE LAND RECLAMATION MINE FIRE CONTROL § 880.11 Qualifications of projects. The purpose of all projects is to prevent injury and loss of life, protect public health, conserve natural resources, or... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Qualifications of projects. 880.11 Section 880...

  16. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...

  17. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  18. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  19. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  20. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  1. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  2. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  3. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Are there certain types of infrastructure and facilities that may not be included in a rural water supply project? 404.10 Section 404.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  4. 43 CFR 404.9 - What types of infrastructure and facilities may be included in an eligible rural water supply...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What types of infrastructure and facilities may be included in an eligible rural water supply project? 404.9 Section 404.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.9...

  5. 43 CFR 404.9 - What types of infrastructure and facilities may be included in an eligible rural water supply...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What types of infrastructure and facilities may be included in an eligible rural water supply project? 404.9 Section 404.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.9 Wha...

  6. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are there certain types of infrastructure and facilities that may not be included in a rural water supply project? 404.10 Section 404.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  7. Costs of abandoned coal mine reclamation and associated recreation benefits in Ohio.

    PubMed

    Mishra, Shruti K; Hitzhusen, Frederick J; Sohngen, Brent L; Guldmann, Jean-Michel

    2012-06-15

    Two hundred years of coal mining in Ohio have degraded land and water resources, imposing social costs on its citizens. An interdisciplinary approach employing hydrology, geographic information systems, and a recreation visitation function model, is used to estimate the damages from upstream coal mining to lakes in Ohio. The estimated recreational damages to five of the coal-mining-impacted lakes, using dissolved sulfate as coal-mining-impact indicator, amount to $21 Million per year. Post-reclamation recreational benefits from reducing sulfate concentrations by 6.5% and 15% in the five impacted lakes were estimated to range from $1.89 to $4.92 Million per year, with a net present value ranging from $14.56 Million to $37.79 Million. A benefit costs analysis (BCA) of recreational benefits and coal mine reclamation costs provides some evidence for potential Pareto improvement by investing limited resources in reclamation projects. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. Assessing coastal reclamation suitability based on a fuzzy-AHP comprehensive evaluation framework: A case study of Lianyungang, China.

    PubMed

    Feng, Lan; Zhu, Xiaodong; Sun, Xiang

    2014-12-15

    Coastal reclamation suitability evaluation (CRSE) is a difficult, complex and protracted process requiring the evaluation of many different criteria. In this paper, an integrated framework employing a fuzzy comprehensive evaluation method and analytic hierarchy process (AHP) was applied to the suitability evaluation for coastal reclamation for future sustainable development in the coastal area of Lianyungang, China. The evaluation results classified 6.63%, 22.99%, 31.59% and 38.79% of the coastline as suitable, weakly suitable, unsuitable and forbidden, respectively. The evaluation results were verified by the marine pollution data and highly consistent with the water quality status. The fuzzy-AHP comprehensive evaluation method (FACEM) was found to be suitable for the CRSE. This CRSE can also be applied to other coastal areas in China and thereby be used for the better management of coastal reclamation and coastline protection projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. The water reclamation and reuse project of El Prat de Llobregat, Barcelona, Spain.

    PubMed

    Mujeriego, R; Compte, J; Cazurra, T; Gullón, M

    2008-01-01

    Water reclamation and reuse have become essential components of water resources management in the Metropolitan Area of Barcelona, by helping to develop additional water resources in the lower Llobregat River, one of its main sources of water supply. By generating a reliable flow of 300,000 m3/day of high quality reclaimed water, the options available for integrated water resources management have widely expanded to allow in-stream river water substitution, restoration of natural wetland areas, agricultural irrigation, and supply to a seawater intrusion barrier. Those management options have been possible thanks to the implementation of an extensive water distribution system that allows distribution of reclaimed water to a point 15 km upstream of the reclamation facility, and to a seawater intrusion barrier within a few kilometres of the plant. The cost of producing reclaimed water using a physico-chemical process (0.05 euro/m3) and the investment required for such a facility (0.21 euro/m3 annual capacity) are very close to those of similar large scale projects in Spain. However, higher degrees of treatment, such as demineralization for agricultural irrigation and for injection into a seawater intrusion barrier, result in considerable increases of both water reclamation cost and investment costs.

  10. 30 CFR 795.1 - Scope and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.1 Scope and purpose. This part comprises the Small Operator Assistance Program (SOAP) and establishes the procedures for...

  11. 30 CFR 795.11 - Assistance funding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.11 Assistance... eligible small operators if available funds are less than those required to provide the services pursuant...

  12. 30 CFR 795.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.3 Definitions. As used in... who has the authority and responsibility for overall management of the Small Operator Assistance...

  13. Vertical distribution of sediment phosphorus in Lake Hachirogata related to the effect of land reclamation on phosphorus accumulation.

    PubMed

    Jin, G; Onodera, S; Saito, M; Maruyama, Y; Hayakawa, A; Sato, T; Ota, Y; Aritomi, D

    2016-01-13

    The focus of this work is the change in sediment properties and chemical characteristics that occur after land reclamation projects. The results indicate a higher sedimentation rate in Lake Hachirogata after reclamation, with the rate increasing with proximity to the agricultural zone. In the west-side water samples, higher levels of dissolved total nitrogen and dissolved total phosphorus (DTP) were found in both surface and bottom waters. The increase in P (39-80%) was generally greater than that for N (12-16%), regarding the nutrient supply from reclaimed farmland in the western part of the lake. In the eastern part of the lake, the pore-water Cl - profile showed a decreasing vertical gradient in the sediment core. This indicates desalination of the lake water after construction of a sluice gate in 1961. In the western sediment-core sample, a uniform Cl - profile indicates the mixing of lake water and pore water after reclamation. Considering the sedimentation of P in the last 100 years, there is a trend of increasing accumulation of P and P-activities after the reclamation project. This appears to be an impact from change in the lake environment as a result of increased agricultural nutrients, desalination, and residence. A large amount of mobile phosphorus (42-72% of TP in the western core sample) trapped in sediment increases the risk of phosphorus release and intensification of algal blooms. High sediment phosphorus and phosphorus mobility should be considered a source of pollution in the coastal environment.

  14. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... Acquisition and Easements, Hydraulics and Hydrology, Water Rights, Project Features and Design, Power... Federal water resource projects, Reclamation will consider proposals for non-Federal development of... part of the Klamath Project, the United States constructed A, B, and C-Canals, which carry water south...

  15. 43 CFR 404.8 - Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be part of an eligible rural water supply project? 404.8 Section 404.8 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURA...

  16. 43 CFR 404.8 - Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be part of an eligible rural water supply project? 404.8 Section 404.8 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL...

  17. 30 CFR 795.5 - Grant application procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....5 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.5 Grant application procedures. A State intending to administer a Small Operator Assistance Program under a grant from...

  18. 16. Photocopy of original USRS photograph (from original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of original USRS photograph (from original print in the Umatilla Project History 1918, on file at National Archives, Rocky Mountain Region, Denver, Colorado) Photographer unknown, ca. 1918. Office of U.S. Reclamation Service - Hermiston, Umatilla Project, Oregon - Former Umatilla Project Headquarters Buildings, Office, Hermiston, Umatilla County, OR

  19. Water reuse in the Apatlaco River Basin (México): a feasibility study.

    PubMed

    Moeller-Chávez, G; Seguí-Amórtegui, L; Alfranca-Burriel, O; Escalante-Estrada, V; Pozo-Román, F; Rivas-Hernández, A

    2004-01-01

    The aim of this work is to determine the technical and economic feasibility of implementing different reclamation and reuse projects that improve the quality of the Apatlaco river basin located in the central part of Mexico. A special methodology based on a decision support system was developed. This methodology allows to decide if it is convenient or not to finance a reclamation or reuse project for the most common water uses in the basin. This methodology is based on the net present value criteria (NPV) of the effective cash flow during the useful life of the project. The results obtained reveal a technical and economical feasibility for industrial reuse in Jiutepec and for agricultural reuse in Zacatepec and Emiliano Zapata. On the other hand, sanitation projects are not feasible in all cases analyzed. Therefore, Mexican Regulation (Ley Federal de Derechos en Materia de Agua) as currently implemented, does not promote and support this kind of projects.

  20. 35. Photographic copy of historic photo, c1915 (original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photographic copy of historic photo, c1915 (original print in Still Photo Branch of the National Archives, RG-155-JC, Washington, DC; photographer unknown). FRONT VIEW OF BOISE PROJECT OFFICE SHOWING UNITED STATES RECLAMATION SERVICE BOISE PROJECT CLERICAL AND ENGINEERING STAFF. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  1. A Study of Vegetation on Revetments Sacramento River Bank Protection Project. Phase 1. Literature Review and Pilot Study

    DTIC Science & Technology

    1990-11-01

    California, Sacramento, CA. 106 Fletcher, William B., and Davidson, Russell L. 1988. "South Santiam River Bank Protection Study, A Pilot Study for the... Poundstone , President Reclamation District 108 P. 0. Box 887 Colusa, CA 95932 Mr. Glenn Hiatt, President Reclamation District 1500 Star Route Knights Landing...R. Farnsworth. Also present were Engineer Kenneth Larch, Attorney George Besyo. Secretary-Manager David P. Grenicher, Emery Poundstone , Jack Wallace

  2. The Physical/Chemical Closed-Loop Life Support Research Project

    NASA Technical Reports Server (NTRS)

    Bilardo, Vincent J., Jr.

    1990-01-01

    The various elements of the Physical/Chemical Closed-Loop Life Support Research Project (P/C CLLS) are described including both those currently funded and those planned for implementation at ARC and other participating NASA field centers. The plan addresses the entire range of regenerative life support for Space Exploration Initiative mission needs, and focuses initially on achieving technology readiness for the Initial Lunar Outpost by 1995-97. Project elements include water reclamation, air revitalization, solid waste management, thermal and systems control, and systems integration. Current analysis estimates that each occupant of a space habitat will require a total of 32 kg/day of supplies to live and operate comfortably, while an ideal P/C CLLS system capable of 100 percent reclamation of air and water, but excluding recycling of solid wastes or foods, will reduce this requirement to 3.4 kg/day.

  3. Watershed models for decision support in the Yakima River basin, Washington

    USGS Publications Warehouse

    Mastin, M.C.; Vaccaro, J.J.

    2002-01-01

    A Decision Support System (DSS) is being developed by the U.S. Geological Survey and the Bureau of Reclamation as part of a long-term project, the Watershed and River Systems Management Program. The goal of the program is to apply the DSS to U.S. Bureau of Reclamation projects in the western United States. The DSS was applied to the Reclamation's Yakima Project in the Yakima River Basin in eastern Washington. An important component of the DSS is the physical hydrology modeling. For the application to the Yakima River Basin, the physical hydrology component consisted of constructing four watershed models using the U.S. Geological Survey's Precipitation-Runoff Modeling System within the Modular Modeling System. The implementation of these models is described. To facilitate calibration of the models, mean annual streamflow also was estimated for ungaged subbasins. The models were calibrated for water years 1950-94 and tested for water years 1995-98. The integration of the models in the DSS for real-time water-management operations using an interface termed the Object User Interface is also described. The models were incorporated in the DSS for use in long-term to short-term planning and have been used in a real-time operational mode since water year 1999.

  4. 30 CFR 921.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 921.795 Section 921.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.795 Small...

  5. WTS-4 system verification unit for wind/hydroelectric integration study

    NASA Technical Reports Server (NTRS)

    Watts, A. W.

    1982-01-01

    The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

  6. The cumulative impacts of reclamation and dredging on the marine ecology and land-use in the Kingdom of Bahrain.

    PubMed

    Zainal, Khadija; Al-Madany, Ismail; Al-Sayed, Hashim; Khamis, Abdelqader; Al Shuhaby, Suhad; Al Hisaby, Ali; Elhoussiny, Wisam; Khalaf, Ebtisam

    2012-07-01

    This article assesses the ecological and economic impacts of land reclamation and dredging through consulting recent environmental impact assessment reports. Geographic features of Bahrain during 1963-2008 are produced using Geographical Information System. Extensive but inexpensive shallow coastal areas and tidal flats have been reclaimed particularly from 1997 to 2007 at a high rate of 21 km(2)/year. Formal records show the increase in the original land mass by the year 2008 to be 91 km(2). An estimated total cumulative loss of major habitats resulting from 10 reclamation projects was around 153.58 km(2). Also much larger scale impacts should be considered resulting from the borrow areas used for the extraction of sand or infill materials. A number of key habitats and species are affected in the vicinity of these projects. The study attempts to assign a monetary value to the marine ecosystem functions. There is a need for efficient coastal zone management to regulate a sustainable use of the marine resources. Copyright © 2012 Elsevier Ltd. All rights reserved.

  7. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  8. Albuquerque's constructed wetland pilot project for wastewater polishing

    Treesearch

    Michael D. Marcus; Shannon M. House; Nathan A. Bowles; Robert T. Sekiya; J. Steven Glass

    1999-01-01

    The City of Albuquerque has funded the Constructed Wetland Pilot Project (CWPP) since 1995 at the City's Southside Water Reclamation Plant (SWRP). Results from CWPP and other wetland treatment projects indicate that appropriately designed surface-flow wetlands could increase the cost-efficiencies of wastewater treatment, as well as help the City meet present and...

  9. 75 FR 8395 - Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona...) will prepare a joint EIS/EIR for the proposed Riverside-Corona Feeder Project. The public and agencies... participate in the planning, design, and construction of the Riverside-Corona Feeder Project including: (i) 20...

  10. Jiangsu coastal highland reclamation and its wetland ecological construction-a case analysis of the Tiaozini reclamation project

    NASA Astrophysics Data System (ADS)

    Yu, Meixiu; Xu, Xianghong

    2017-04-01

    Reclamation is one potential solution for the increasing demand of new land for living and development. In past centuries, many coastal countries, such as the Netherlands, UK, Japan, South Korea and Singapore, had exploited extensively sea enclosing and reclamation fordefense against storm surges,agricultural and industrial development, as well as for coastal city expansion along the coast. China has continuously reclaimed coastal sea areas from the 1950s. With rapid economic development and increasing population in coastal areas during recent decades, reclamation has been regarded as an effective measure to resolve the land shortage as cities and industries expand, particularly in South-East coastal areas. Jiangsu province, located in East China, has a similar amount of land territory area to the Netherlands, however, its population is almost fivefold instead. Since its coastal area generates large amounts of tidal flat resources due to its unique hydrodynamic and geomorphic conditions, coastal reclamation plays a vital role in guaranteeing the food security for the Jiangsu Province or even the whole nation. The Tiaozini Reclamation Project (TRP), located between N32.720°-32.882°, E120.894°-120.969°, in Jianggang county of Jiangsu coastal region, with an area of 6,746ha, was reclaimed along the prograding muddy silt coast in 2012. It should be noted that the TRP was reclaimed from theoretical bathymetrical datum of about 4.6m. It is estimated that the shoreline moves towards the sea at a rate of 100m/year and the tidal flat raises at a rate of 5 10 cm/year respectively because of the external tidal flat being continually prograding and drying. After finishing reclamation,the TRP develops with nature: for the dried tidal flat high land,developing ecological agriculture after integrated soil improvement with reducing salt and cultivating fertilizer; for the drying tidal flat,developing ecological fishery by inceasing artificial wetland area; for lower tidal flat,developing more suitable water bird habitats by reserving natural ecological wetland and restoring affected wetland. The TRP is attempting to be built as an ecological cultivation demonstration integrated with ecological restoration, science research and education, and ecological leisure respectively. To better protecting and restoring tidal wetland, and for sustainable utilization and management of wetland resource, Jiangsu coast development group CO., Ltd (it is in charge of the TRP reclamation and development), Hohai University and Deltares signed a triple cooperation strategic framework agreement, co-building the Jiangsu Province coastal development and ecological construction engineering center. Besides, routine surveys in ecological, hydrological, topographic data in/around the TRP are also carrying out as well as the ecological compensations.

  11. 40. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). ROOF PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  12. 38. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  13. 37. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). BASEMENT PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  14. 39. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  15. 45. Photographic copy of original construction drawing, dated 16 February ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of original construction drawing, dated 16 February 1916 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). LOT SURVEY. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  16. 41. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). CROSS SECTIONS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  17. EVALUATION OF EFFECTIVENESS AND COST-BENEFITS OF WOOLEN ROADSIDE RECLAMATION PRODUCTS

    DOT National Transportation Integrated Search

    2017-12-01

    This research project developed three types of products for study: woolen erosion control blankets (ECBs), wool incorporated into wood fiber compost at a 40:1 ratio (compost to wool, by weight), and wool incorporated into silt fence. The project, sup...

  18. 30 CFR 937.795 - Small operator assistance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Small operator assistance. 937.795 Section 937.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE OREGON § 937.795 Small operator...

  19. 30 CFR 937.795 - Small operator assistance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Small operator assistance. 937.795 Section 937.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE OREGON § 937.795 Small operator...

  20. 30 CFR 937.795 - Small operator assistance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Small operator assistance. 937.795 Section 937.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE OREGON § 937.795 Small operator...

  1. 30 CFR 933.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 933.795 Section 933.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE NORTH CAROLINA § 933.795 Small...

  2. 30 CFR 910.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 910.795 Section 910.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE GEORGIA § 910.795 Small operator...

  3. 30 CFR 942.795 - Small operator assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance program. 942.795 Section 942.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE TENNESSEE § 942.795 Small...

  4. 30 CFR 947.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 947.795 Section 947.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE WASHINGTON § 947.795 Small operator...

  5. 30 CFR 903.795 - Small operator assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance program. 903.795 Section 903.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE ARIZONA § 903.795 Small...

  6. 30 CFR 922.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 922.795 Section 922.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE MICHIGAN § 922.795 Small operator...

  7. 30 CFR 941.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 941.795 Section 941.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE SOUTH DAKOTA § 941.795 Small...

  8. 30 CFR 939.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 939.795 Section 939.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE RHODE ISLAND § 939.795 Small...

  9. 30 CFR 937.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 937.795 Section 937.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE OREGON § 937.795 Small operator...

  10. 30 CFR 905.795 - Small operator assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance program. 905.795 Section 905.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE CALIFORNIA § 905.795 Small...

  11. 30 CFR 912.795 - Small operator assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Small operator assistance. 912.795 Section 912.795 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.795 Small operator...

  12. Sacramento River Flood Control System Evaluation, Phases II-V. Programmatic Environmental Impact Statement/Environmental Impact Report

    DTIC Science & Technology

    1992-05-01

    meetings, call Mr. David Gundlach, Project Manager, Corps of Engineers, at (916) 557-6675 or Mr. Ricardo Pineda , State of California, Reclamation...local Colusa Library and the nearest hearing is tonight in Yuba City. Mr. Ricardo Pineda of the State Reclamation Board sent me a copy which I...last one you had in Colusa although Mr. Pineda said v/e are now combined with Yuba City because the attendance was so poor at the Colusa one. I

  13. Impact of direct greenhouse gas emissions on the carbon footprint of water reclamation processes employing nitrification-denitrification.

    PubMed

    Schneider, Andrew G; Townsend-Small, Amy; Rosso, Diego

    2015-02-01

    Water reclamation has the potential to reduce water supply demands from aquifers and more energy-intensive water production methods (e.g., seawater desalination). However, water reclamation via biological nitrification-denitrification is also associated with the direct emission of the greenhouse gases (GHGs) CO₂, N₂O, and CH₄. We quantified these direct emissions from the nitrification-denitrification reactors of a water reclamation plant in Southern California, and measured the (14)C content of the CO₂ to distinguish between short- and long-lived carbon. The total emissions were 1.5 (±0.2) g-fossil CO₂ m(-3) of wastewater treated, 0.5 (±0.1) g-CO₂-eq of CH₄ m(-3), and 1.8 (±0.5) g-CO₂-eq of N₂O m(-3), for a total of 3.9 (±0.5) g-CO₂-eqm(-3). This demonstrated that water reclamation can be a source of GHGs from long lived carbon, and thus a candidate for GHG reduction credit. From the (14)C measurements, we found that between 11.4% and 15.1% of the CO₂ directly emitted was derived from fossil sources, which challenges past assumptions that the direct CO₂ emissions from water reclamation contain only modern carbon. A comparison of our direct emission measurements with estimates of indirect emissions from several water production methods, however, showed that the direct emissions from water reclamation constitute only a small fraction of the plant's total GHG footprint. Copyright © 2014 Elsevier B.V. All rights reserved.

  14. 43 CFR 418.13 - Maximum allowable limits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA... 308,319 acre-feet for the 1995 Example. The sample MAD corresponds to a system efficiency for full... Expected Project Distribution System Efficiency shows the target efficiencies which will be used over the...

  15. 44. Photographic copy of original construction drawing, dated August 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of original construction drawing, dated August 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). PLANS AND SECTIONS OF VAULTS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  16. 43 CFR 418.13 - Maximum allowable limits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA... 308,319 acre-feet for the 1995 Example. The sample MAD corresponds to a system efficiency for full... Expected Project Distribution System Efficiency shows the target efficiencies which will be used over the...

  17. Papaya drying and waste conversion system. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-02-12

    This project, performed under United States Department of Energy Small-scale Appropriate Energy Technology Grant, involves demonstration of an integrated system using solar energy to process off-grade or reject fruit into marketable food products. The integrated system consists of three phases: (1) solar dehydration of usable fruit; (2) solar vacuum distillation of fermented wastes (peelings, rinds, skins, and seeds) to produce an ethanol fuel to use as a backup source of heat for dehydration; and (3) land reclamation by mixing stillage and compost with volcanic cinder and ash to produce on marginal land a rich soil suitable for growing more cropsmore » to dry. Although the system is not 100% complete the investigators have demonstrated that a small business can efficiently use solar energies in an integrated fashion to process waste into food, improve the quality of the land, and provide meaningful jobs in a region of very high unemployment.« less

  18. 75 FR 77000 - South Coast Conduit/Upper Reach Reliability Project, Santa Barbara County, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... pipeline for improving water supply reliability to Cachuma Project (CP) and State Water Project (SWP... percent of the water supply for communities along the South Coast of Santa Barbara County. Reclamation... demands it is not able to provide the water needed. No redundant supply or pipeline exists to convey CVP...

  19. Revegetation of Reconstructed Reaches of the Provo River, Heber Valley, Utah

    Treesearch

    John A. Rice

    2006-01-01

    In 1999, the Utah Reclamation Mitigation and Conservation Commission began the Provo River Restoration Project to create a more naturally functioning riverine ecosystem between Jordanelle Dam and Deer Creek Reservoir. The purpose of the project was to mitigate for past impacts to riverine, wetland, and riparian habitats caused by the Central Utah Project and other...

  20. 43 CFR 426.16 - Exemptions and exclusions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... announces availability of temporary supplies of water resulting from an unusually large water supply, not... water from a Corps project, Reclamation will exempt that land from specific provisions of Federal... control or conveyance of the agricultural water supply from the Corps project to that land. (2) Upon such...

  1. 30 CFR 795.12 - Applicant liability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.12 Applicant... 12 months immediately following the date on which the operator is issued the surface coal mining and...

  2. Project Summary Report : Evaluation of Effectiveness and Cost-Benefits of Woolen Roadside Reclamation Products

    DOT National Transportation Integrated Search

    2017-12-01

    Wool has been used by humans for millennia for clothing, blankets, and even for housing like the yurts of central Asia. This project took a fresh look at wool and explored its potential for incorporation in erosion control blankets (ECBs) and to incr...

  3. 76 FR 33361 - Notice of Availability of the Final Environmental Impact Statement for the Madera Irrigation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... Impact Statement for the Madera Irrigation District Water Supply Enhancement Project located in Madera... Madera Irrigation District Water Supply Enhancement Project (MID WSEP). Reclamation proposes to approve... supply reliability and flexibility for current and future water demand, and reduce local overdraft, MID...

  4. 43. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). NORTH ELEVATION (NORTH SIDE) AND WEST ELEVATION (WEST SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  5. 42. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). EAST ELEVATION (EAST SIDE) AND SOUTH ELEVATION (SOUTH SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  6. 76 FR 3655 - Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona... Draft Environmental Impact Statement (SDEIR/DEIS) for the proposed Riverside-Corona Feeder (RCF) Project... Bernardino, California 92410 Corona Public Library, 650 South Main Street, Corona, California 92882 Riverside...

  7. 77 FR 66480 - Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... availability. SUMMARY: We, the Bureau of Reclamation, announce the availability of the final environmental impact statement on the Narrows Project, a non- Federal dam and reservoir proposed by the Sanpete Water... Availability of Weekly Receipt of Environmental Impact Statements in the Federal Register. This notice, usually...

  8. 43 CFR 418.24 - Precautionary drawdown and spills from Lahontan Reservoir.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Lahontan Reservoir. 418.24 Section 418.24 Public Lands: Interior Regulations Relating to Public Lands... RECLAMATION PROJECT, NEVADA Operations and Management § 418.24 Precautionary drawdown and spills from Lahontan Reservoir. (a) Even though flood control is not a specifically authorized purpose of the Project, at the...

  9. 43 CFR 418.24 - Precautionary drawdown and spills from Lahontan Reservoir.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lahontan Reservoir. 418.24 Section 418.24 Public Lands: Interior Regulations Relating to Public Lands... RECLAMATION PROJECT, NEVADA Operations and Management § 418.24 Precautionary drawdown and spills from Lahontan Reservoir. (a) Even though flood control is not a specifically authorized purpose of the Project, at the...

  10. Automated Techniques for Quantification of Coastline Change Rates using Landsat Imagery along Caofeidian, China

    NASA Astrophysics Data System (ADS)

    Dong, Di; Li, Ziwei; Liu, Zhaoqin; Yu, Yang

    2014-03-01

    This paper focuses on automated extraction and monitoring of coastlines by remote sensing techniques using multi-temporal Landsat imagery along Caofeidian, China. Caofeidian, as one of the active economic regions in China, has experienced dramatic change due to enhanced human activities, such as land reclamation. These processes have caused morphological changes of the Caofeidian shoreline. In this study, shoreline extraction and change analysis are researched. An algorithm based on image texture and mathematical morphology is proposed to automate coastline extraction. We tested this approach and found that it's capable of extracting coastlines from TM and ETM+ images with little human modifications. Then, the detected coastline vectors are imported into Arcgis software, and the Digital Shoreline Analysis System (DSAS) is used to calculate the change rate (the end point rate and linear regression rate). The results show that in some parts of the research area, remarkable coastline changes are observed, especially the accretion rate. The abnormal accretion is mostly attributed to the large-scale land reclamation during 2003 and 2004 in Caofeidian. So we can conclude that various construction projects, especially the land reclamation project, have made Caofeidian shorelines change greatly, far above the normal.

  11. Physical modeling of river spanning rock structures: Evaluating interstitial flow, local hydraulics, downstream scour development, and structure stability

    USGS Publications Warehouse

    Collins, K.L.; Thornton, C.I.; Mefford, B.; Holmquist-Johnson, C. L.

    2009-01-01

    Rock weir and ramp structures uniquely serve a necessary role in river management: to meet water deliveries in an ecologically sound manner. Uses include functioning as low head diversion dams, permitting fish passage, creating habitat diversity, and stabilizing stream banks and profiles. Existing information on design and performance of in-stream rock structures does not provide the guidance necessary to implement repeatable and sustainable construction and retrofit techniques. As widespread use of rock structures increases, the need for reliable design methods with a broad range of applicability at individual sites grows as well. Rigorous laboratory testing programs were implemented at the U.S. Bureau of Reclamation (Reclamation) and at Colorado State University (CSU) as part of a multifaceted research project focused on expanding the current knowledge base and developing design methods to improve the success rate of river spanning rock structures in meeting project goals. Physical modeling at Reclamation is being used to measure, predict, and reduce interstitial flow through rock ramps. CSU is using physical testing to quantify and predict scour development downstream of rock weirs and its impact on the stability of rock structures. ?? 2009 ASCE.

  12. Water Reclamation and Reuse.

    PubMed

    Huang, Chunkai; Zeng, Ping; Yang, Sen; Shao, Yanxi; Liu, Yang

    2016-10-01

    A review of the literature published in 2015 on topics relating to water reclamation and reuse is presented. The review is divided into the following sections: (1) General: extent of reuse, research needs, guidelines and monitoring, health effects; (2) Treatment technologies: integrated process design, membrane treatment, membrane bioreactors, electrocoagulation, ion exchange and adsorption, disinfection, wetlands, managed aquifer recharge; (3) Planning and management: public acceptance and education, economics/pricing, water quality planning and management and project/case studies. Much of the water treatment research focuses on membrane treatment, integrated designs, and other innovative technologies.

  13. The human factor in mining reclamation

    USGS Publications Warehouse

    Arbogast, Belinda F.; Knepper, Daniel H.; Langer, William H.

    2000-01-01

    Rapid urbanization of the landscape results in less space available for wildlife habitat, agriculture, and recreation. Mineral resources (especially nonmetallic construction materials) become unrecoverable due to inaccessibility caused by development. This report both describes mine sites with serious problems and draws attention to thoughtful reclamation projects for better future management. It presents information from selected sites in terms of their history, landform, design approach, and visual discernment. Examples from Colorado are included to introduce the broader issue of regions soundly developing mining sites, permitting the best utilization of natural resources, and respecting the landscape.

  14. What to Do About Water.

    ERIC Educational Resources Information Center

    Goldin, Augusta

    1985-01-01

    Lists causes of freshwater supply depletion and successful reclamation projects including Imperial Dam in California, desalination in Arizona, and dual water supply in Florida. A national water policy is advocated. (DH)

  15. Mechanization for Optimal Landscape Reclamation

    NASA Astrophysics Data System (ADS)

    Vondráčková, Terezie; Voštová, Věra; Kraus, Michal

    2017-12-01

    Reclamation is a method of ultimate utilization of land adversely affected by mining or other industrial activity. The paper explains the types of reclamation and the term “optimal reclamation”. Technological options of the long-lasting process of mine dumps reclamation starting with the removal of overlying rocks, transport and backfilling up to the follow-up remodelling of the mine dumps terrain. Technological units and equipment for stripping flow division. Stripping flow solution with respect to optimal reclamation. We recommend that the application of logistic chains and mining simulation with follow-up reclamation to open-pit mines be used for the implementation of optimal reclamation. In addition to a database of local heterogeneities of the stripped soil and reclaimed land, the flow of earths should be resolved in a manner allowing the most suitable soil substrate to be created for the restoration of agricultural and forest land on mine dumps. The methodology under development for the solution of a number of problems, including the geological survey of overlying rocks, extraction of stripping, their transport and backfilling in specified locations with the follow-up deployment of goal-directed reclamation. It will make possible to reduce the financial resources needed for the complex process chain by utilizing GIS, GPS and DGPS technologies, logistic tools and synergistic effects. When selecting machines for transport, moving and spreading of earths, various points of view and aspects must be taken into account. Among such aspects are e.g. the kind of earth to be operated by the respective construction machine, the kind of work activities to be performed, the machine’s capacity, the option to control the machine’s implement and economic aspects and clients’ requirements. All these points of view must be considered in the decision-making process so that the selected machine is capable of executing the required activity and that the use of an unsuitable machine is eliminated as it would result in a delay and increase in the project costs. Therefore, reclamation always includes extensive earth-moving work activities restoring the required relief of the land being reclaimed. Using the earth-moving machine capacity, the kind of soil in mine dumps, the kind of the work activity performed and the machine design, a SW application has been developed that allows the most suitable machine for the respective work technology to be selected with a view to preparing the land intended for reclamation.

  16. 30 CFR 795.8 - Application approval and notice.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Application approval and notice. 795.8 Section 795.8 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.8...

  17. 30 CFR 795.7 - Filing for assistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL OPERATOR ASSISTANCE PERMANENT REGULATORY PROGRAM-SMALL OPERATOR ASSISTANCE PROGRAM § 795.7 Filing for... each year of the proposed permit. (d) A description of— (1) The proposed method of coal mining; (2) The...

  18. [Splash erosion of black soil with different reclamation years and its relations to soil aggregates selective characteristics].

    PubMed

    Zhou, Yi-Yang; Wang, En-Heng; Chen, Xiang-Wei

    2009-10-01

    Taking the typical black soil with a reclamation history of 8, 30, and 50 years and the un-reclaimed secondary forest land as test objects, a simulation study was made on the process of splash erosion and the selective characteristics of soil aggregates under artificial rainfall condition, with the effects of reclamation on the splash erosion in black soil region analyzed. The splash amount of reclaimed black soil was evidently higher than that of un-reclaimed secondary forest land, and increased with increasing reclamation years, with a variation range of 0.95-7.06 g x cm(-1). There was a significant exponential correlation between splash amount and splash distance, and the percentages of small size water-stable aggregates increased with increasing splash distance. The critical particle size of soil aggregates for the enrichment and depletion of splash erosion was 1.0 mm. Soil water-stable aggregates larger than 2 mm and smaller than 0.25 mm in size and soil organic matter content were the main factors affecting the splash erosion characteristics of typical black soil.

  19. 30 CFR 756.17 - Approval of the Hopi Tribe's abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... public facilities projects; section II, B(1)(d)(ii), concerning the protection of property; and section... eligible projects; Chairman's Letter of Designation and Hopi Tribe Resolution—Designation of Tribal agency... mineral industry on Tribal lands impacted by coal or mineral development; Section II, G—Reports; Sections...

  20. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  1. 76 FR 18780 - Integrated Water Resource Management Plan, Yakima River Basin Water Enhancement Project, Benton...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... Enhancement Project. The Washington State Department of Ecology (Ecology) will be a joint lead agency with..., most of these water right uncertainties have been addressed. In 2003, Reclamation and Ecology initiated... with comments on the Draft PR/EIS prompted Ecology to separate from the National Environmental Policy...

  2. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on the Sun River in Lewis and Clark and Teton...

  3. Presidential Green Chemistry Challenge: 2006 Small Business Award

    EPA Pesticide Factsheets

    Presidential Green Chemistry Challenge 2006 award winners, Arkon Consultants and NuPro Technologies, developed a safer processing system for flexographic printing that includes washout solvents and reclamation/recycling.

  4. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... and facilities that may not be included in a rural water supply project? 404.10 Section 404.10 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.10 Are there certain types of infrastructure and facilities that may not be included in a rural water supply project? Yes. A rural water supply project may...

  5. 2011 Georgiana Slough non-physical barrier performance evaluation project report

    USGS Publications Warehouse

    Reeves, Ryan R.; McQuirk, Jacob; Ameri, Khalid; Perry, Russell W.; Romine, Jason G.; Liedtke, Theresa L.; Burau, Jon R.; Blake, Aaron R.; Fitzer, Chris; Smith, Natalie; Pagliughi, Steve; Johnston, Sam; Kumagai, Kevin; Cash, Kenneth

    2012-01-01

    Under the ESA, the National Marine Fisheries Service (NMFS) issued the 2009 Biological and Conference Opinion for the Long‐Term Operations of the Central Valley Project and State Water Project (BO) for Chinook salmon and other listed anadromous fish species (NMFS 2009). Reasonable and Prudent Alternative (RPA) Action IV.1.3 of the BO requires the California Department of Water Resources (DWR) and the U.S. Bureau of Reclamation (Reclamation) to consider engineering solutions to reduce the diversion of juvenile salmonids from the Sacramento River into the interior and south Delta. DWR implemented the 2011 Georgiana Slough NonPhysical Barrier (GSNPB) Study to test the effectiveness of using a non-physical barrier, referred to as a behavioral Bio-Acoustic Fish Fence (BAFF), that combines three stimuli to deter juvenile Chinook salmon from entering Georgiana Slough: sound, high-intensity modulated light (previously known as stroboscopic light), and a bubble curtain. This report presents the results of the experimental tests conducted in 2011.

  6. Photographic copy of photograph, Joseph Yolo, photographer, 1936 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, Joseph Yolo, photographer, 1936 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "WAHT A GOVERNMENT CANAL AND AN ASSURED WATER SUPPLY WILL DO IN A DESERT AREA IS SHOWN IN THIS AIR VIEW OF A SECTION OF THE YAKIMA FEDERAL RECLAMATION PROJECT IN CENTRAL WASHINGTON. THE MAIN CANAL IS SEEN RUNNING DOWN THE MIDDLE OF THE VALLEY WITH PATCHES OF ORCHARDS AND FIELDS ON EITHER SIDE, BUT ABOVE THE CANAL LINE THE SAGE BRUSH DESERT REMAINS, AS CAN BE SEEN ON THE LEFT. THE YAKIMA PROJECT SUPPORTS MORE THAN 110,000 PEOPLE IN A TERRITORY WHICH WAS DESERT 35 YEARS AGO. MANY OF THE ORIGINAL SETTLERS WHO CAME, LIKE THOSE WHO ARE NOW SETTLING ON THE VALE PROJECT, TO BREAK THE RAW DESERT LAND, ARE STILL LIVING ON THESE NEATLY CHECKERBOARDED FARMS" - Kachess Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  7. Environmental Management and the New Politics of Western Water: The Animas-La Plata Project and Implementation of the Endangered Species Act.

    PubMed

    ELLISON

    1999-05-01

    / This paper explores the new politics of western water policy through an examination of the Animas-La Plata water project and implementation of the Endangered Species Act. It is suggested that the focus of western water programming has shifted from the source of distributed funds, the United States Congress, to the agencies originally created to deliver federal benefits because funding for new project construction has not been forthcoming. Under this new system, members of Congress continue to excite their constituents with promises of money for new project starts, while the administrative agencies perform the myriad duties needed to keep these projects alive. The result is that political objectives have replaced operational/management objectives in administrative processes. In this case, the author demonstrates how resource managers in the Bureau of Reclamation manipulated hydrological analysis to control administrative process, why their manipulation was unfair, and perhaps illegal, and why biologists from the US Fish and Wildlife Service accepted the analysis. While ostensibly protecting all interests, the result is that none of the objectives of federal water programming are achieved. KEY WORDS: Environmental management; Administrative politics; Water policy; Endangered Species Act; Animas-La Plata, Bureau of Reclamation

  8. Water transfer and major environmental provisions of the Central Valley Project Improvement Act: A preliminary economic evaluation

    NASA Astrophysics Data System (ADS)

    Loomis, John B.

    1994-06-01

    Increasing block water pricing, water transfer, and wildlife refuge water supply provisions of the Central Valley Project (CVP) Improvement Act are analyzed in terms of likely farmer response and economic efficiency of these provisions. Based on a simplified partial equilibrium analysis, we estimate small, but significant water conservation savings due to pricing reform, the potential for substantial water transfers to non-CVP customers in severe drought years when the water price exceeds 110 per acre foot (1 acre foot equals 1.234 × 103 m3) and positive net benefits for implementation of the wildlife refuge water supply provisions. The high threshold water price is partly a result of requiring farmers to pay full cost on transferred water plus a surcharge of 25 per acre foot if the water is transferred to a non-CVP user. The act also sets an important precedent for water pricing reform, water transfer provisions, and environmental surcharges on water users that may find their way to other Bureau of Reclamation projects.

  9. Reclamation of abandoned mined lands along th Upper Illinois Waterway using dredged material

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Luik, A; Harrison, W

    1982-01-01

    Sediments were sampled and characterized from 28 actual or proposed maintenance-dredging locations in the Upper Illinois Waterway, that is, the Calumet-Sag Channel, the Des Plaines River downstream of its confluence with the Calumet-Sag Channel, and the Illinois River from the confluence of the Kankakee and Des Plaines rivers to Havana, Illinois. Sufficient data on chemical constituents and physical sediments were obtained to allow the classification of these sediments by currently applicable criteria of the Illinois Environmental Protection Agency for the identification of hazardous, persistent, and potentially hazardous wastes. By these criteria, the potential dredged materials studied were not hazardous, persistent,more » or potentially hazardous; they are a suitable topsoil/ reclamation medium. A study of problem abandoned surface-mined land sites (problem lands are defined as being acidic and/or sparsely vegetated) along the Illinois River showed that three sites were particularly well suited to the needs of the Corps of Engineers (COE) for a dredged material disposal/reclamation site. Thes sites were a pair of municipally owned sites in Morris, Illinois, and a small corporately owned site east of Ottawa, Illinois, and adjacent to the Illinois River. Other sites were also ranked as to suitability for COE involvement in their reclamation. Reclamation disposal was found to be an economically competitive alternative to near-source confined disposal for Upper Illinois Waterway dredged material.« less

  10. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    DTIC Science & Technology

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  11. 75 FR 50777 - Minidoka Dam Spillway Replacement, Minidoka County, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-17

    ... INFORMATION: Minidoka Dam impounds Lake Walcott and is a feature of Reclamation's Minidoka Project. They are... numerous locations. In addition, the potential for ice damage to the stoplog piers requires that reservoir...

  12. Avra/Black Wash Reclamation and Riparian Restoration Project

    THOMAS, 111th Congress

    Rep. Grijalva, Raul M. [D-AZ-7

    2009-01-08

    Senate - 04/27/2010 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  13. An Archive of Downscaled WCRP CMIP3 Climate Projections for Planning Applications in the Contiguous United States

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Pruitt, T.; Maurer, E. P.; Duffy, P. B.

    2007-12-01

    Incorporating climate change information into long-term evaluations of water and energy resources requires analysts to have access to climate projection data that have been spatially downscaled to "basin-relevant" resolution. This is necessary in order to develop system-specific hydrology and demand scenarios consistent with projected climate scenarios. Analysts currently have access to "climate model" resolution data (e.g., at LLNL PCMDI), but not spatially downscaled translations of these datasets. Motivated by a common interest in supporting regional and local assessments, the U.S. Bureau of Reclamation and LLNL (through support from the DOE National Energy Technology Laboratory) have teamed to develop an archive of downscaled climate projections (temperature and precipitation) with geographic coverage consistent with the North American Land Data Assimilation System domain, encompassing the contiguous United States. A web-based information service, hosted at LLNL Green Data Oasis, has been developed to provide Reclamation, LLNL, and other interested analysts free access to archive content. A contemporary statistical method was used to bias-correct and spatially disaggregate projection datasets, and was applied to 112 projections included in the WCRP CMIP3 multi-model dataset hosted by LLNL PCMDI (i.e. 16 GCMs and their multiple simulations of SRES A2, A1b, and B1 emissions pathways).

  14. 76 FR 336 - Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) for PacRim Coal's Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... Environmental Impact Statement (SEIS) for PacRim Coal's Proposed Chuitna Coal Project AGENCY: U.S. Army Corps of... Chuitna Coal Project. It is anticipated that the Environmental Protection Agency (EPA), the Native Village... the Alaska Surface Coal Mining Control and Reclamation Act (ASCMCRA) permit, which governs all aspects...

  15. 43 CFR 404.13 - What criteria will Reclamation use to prioritize requests for assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... urgent and compelling need for a rural water supply project that would: (1) Address present or future water supply needs; or (2) Promote public health and safety by addressing present and preventing future violations of drinking water standards; (b) The extent to which a rural water supply project promotes and...

  16. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...

  17. Evaluating the oil sands reclamation process: Assessing policy capacity and stakeholder access for government and non-governmental organizations operating in Alberta's oil sands

    NASA Astrophysics Data System (ADS)

    Patterson, Tyler

    By employing interpretive policy analysis this thesis aims to assess, measure, and explain policy capacity for government and non-government organizations involved in reclaiming Alberta's oil sands. Using this type of analysis to assess policy capacity is a novel approach for understanding reclamation policy; and therefore, this research will provide a unique contribution to the literature surrounding reclamation policy. The oil sands region in northeast Alberta, Canada is an area of interest for a few reasons; primarily because of the vast reserves of bitumen and the environmental cost associated with developing this resource. An increase in global oil demand has established incentive for industry to seek out and develop new reserves. Alberta's oil sands are one of the largest remaining reserves in the world, and there is significant interest in increasing production in this region. Furthermore, tensions in several oil exporting nations in the Middle East remain unresolved, and this has garnered additional support for a supply side solution to North American oil demands. This solution relies upon the development of reserves in both the United States and Canada. These compounding factors have contributed to the increased development in the oil sands of northeastern Alberta. Essentially, a rapid expansion of oil sands operations is ongoing, and is the source of significant disturbance across the region. This disturbance, and the promises of reclamation, is a source of contentious debates amongst stakeholders and continues to be highly visible in the media. If oil sands operations are to retain their social license to operate, it is critical that reclamation efforts be effective. One concern non-governmental organizations (NGOs) expressed criticizes the current monitoring and enforcement of regulatory programs in the oil sands. Alberta's NGOs have suggested the data made available to them originates from industrial sources, and is generally unchecked by government. In an effort to discern the overall status of reclamation in the oil sands this study explores several factors essential to policy capacity: work environment, training, employee attitudes, perceived capacity, policy tools, evidence based work, and networking. Data was collected through key informant interviews with senior policy professionals in government and non-government agencies in Alberta. The following are agencies of interest in this research: Canadian Association of Petroleum Producers (CAPP); Alberta Environment and Sustainable Resource Development (AESRD); Alberta Energy Regulator (AER); Cumulative Environmental Management Association (CEMA); Alberta Environment Monitoring, Evaluation, and Reporting Agency (AEMERA); Wood Buffalo Environmental Association (WBEA). The aim of this research is to explain how and why reclamation policy is conducted in Alberta's oil sands. This will illuminate government capacity, NGO capacity, and the interaction of these two agency typologies. In addition to answering research questions, another goal of this project is to show interpretive analysis of policy capacity can be used to measure and predict policy effectiveness. The oil sands of Alberta will be the focus of this project, however, future projects could focus on any government policy scenario utilizing evidence-based approaches.

  18. Methow and Columbia Rivers studies: summary of data collection, comparison of database structure and habitat protocols, and impact of additional PIT tag interrogation systems to survival estimates, 2008-2012

    USGS Publications Warehouse

    Martens, Kyle D.; Tibbits, Wesley T.; Watson, Grace A.; Newsom, Michael A.; Connolly, Patrick J.

    2014-01-01

    The U.S. Geological Survey (USGS) received funding from the Bureau of Reclamation (Reclamation) to provide monitoring and evaluation on the effectiveness of stream restoration efforts by Reclamation in the Methow River watershed. This monitoring and evaluation program is designed to partially fulfill Reclamation’s part of the 2008 Biological Opinion for the Federal Columbia River Power System that includes a Reasonable and Prudent Alternative (RPA) to protect listed salmon and steelhead across their life cycle. The target species in the Methow River for the restoration effort include Upper Columbia River (UCR) spring Chinook salmon (Oncorhynchus tshawytscha), UCR steelhead (Oncorhynchus mykiss), and bull trout (Salvelinus confluentus), which are listed as threatened or endangered under the Endangered Species Act. Since 2004, the USGS has completed two projects of monitoring and evaluation in the Methow River watershed. The first project focused on the evaluation of barrier removal and steelhead recolonization in Beaver Creek with Libby and Gold Creeks acting as controls. The majority of this work was completed by 2008, although some monitoring continued through 2012. The second project (2008–2012) evaluated the use and productivity of the middle Methow River reach (rkm 65–80) before the onset of multiple off-channel restoration projects planned by the Reclamation and Yakama Nation. The upper Methow River (upstream of rkm 80) and Chewuch River serve as reference reaches and the Methow River downstream of the Twisp River (downstream of rkm 65) serves as a control reach. Restoration of the M2 reach was initiated in 2012 and will be followed by a multi-year, intensive post-evaluation period. This report is comprised of three chapters covering different aspects of the work completed by the USGS. The first chapter is a review of data collection that documents the methods used and summarizes the work done by the USGS from 2008 through 2012. This data summary was designed to show some initial analysis and to disseminate summary information that could potentially be used in ongoing modeling efforts by USGS, Reclamation, and University of Idaho. The second chapter documents the database of fish and habitat data collected by USGS from 2004 through 2012 and compares USGS habitat protocols to the Columbia Habitat Monitoring Program (CHaMP) protocol. The third chapter is a survival analysis of fish moving through Passive Integrated Transponder (PIT) tag interrogation systems in the Methow and Columbia Rivers. It examines the effects of adding PIT tags and/or PIT tag interrogation systems on survival estimates of juvenile steelhead and Chinook salmon.

  19. 43 CFR 2524.7 - Disposal of lands in excess of 160 acres.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.7 Disposal of lands in excess of 160 acres. Desert...

  20. 43 CFR 2524.7 - Disposal of lands in excess of 160 acres.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.7 Disposal of lands in excess of 160 acres. Desert...

  1. 43 CFR 2524.7 - Disposal of lands in excess of 160 acres.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.7 Disposal of lands in excess of 160 acres. Desert...

  2. 43 CFR 2524.7 - Disposal of lands in excess of 160 acres.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.7 Disposal of lands in excess of 160 acres. Desert...

  3. Mainstreaming Climate Change: Recent and Ongoing Efforts to Understand, Improve, and Expand Consideration of Climate Change in Federal Water Resources Planning

    NASA Astrophysics Data System (ADS)

    Ferguson, I. M.; McGuire, M.; Broman, D.; Gangopadhyay, S.

    2017-12-01

    The Bureau of Reclamation is a Federal agency tasked with developing and managing water supply and hydropower projects in the Western U.S. Climate and hydrologic variability and change significantly impact management actions and outcomes across Reclamation's programs and initiatives, including water resource planning and operations, infrastructure design and maintenance, hydropower generation, and ecosystem restoration, among others. Planning, design, and implementation of these programs therefore requires consideration of future climate and hydrologic conditions will impact program objectives. Over the past decade, Reclamation and other Federal agencies have adopted new guidelines, directives, and mandates that require consideration of climate change in water resources planning and decision making. Meanwhile, the scientific community has developed a large number of climate projections, along with an array of models, methods, and tools to facilitate consideration of climate projections in planning and decision making. However, water resources engineers, planners, and decision makers continue to face challenges regarding how best to use the available data and tools to support major decisions, including decisions regarding infrastructure investments and long-term operating criteria. This presentation will discuss recent and ongoing research towards understanding, improving, and expanding consideration of climate projections and related uncertainties in Federal water resources planning and decision making. These research efforts address a variety of challenges, including: How to choose between available climate projection datasets and related methods, models, and tools—many of which are considered experimental or research tools? How to select an appropriate decision framework when design or operating alternatives may differ between climate scenarios? How to effectively communicate results of a climate impacts analysis to decision makers? And, how to improve robustness and resilience of water resources systems in the face of significant uncertainty? Discussion will focus on the intersection between technical challenges and decision making paradigms and the need for improved scientist-decision maker engagement through the lens of this Federal water management agency.

  4. Environmental Hazard of Selenium in the Animas La Plata Wate Development Project

    Treesearch

    A. Dennis Lemly

    1997-01-01

    A hazard assessment of selenium was conducted for the Animas La Plata Project, a multiple-use water development proposed for Colorado and New Mexico by the United States Bureau of Reclamation. A published protocol for aquatic hazard assessment of selenium was applied to environmental monitoring data to assess current threats to biota in the water supply rivers (Animas...

  5. 76. Photographic copy of historic photo, ca. 1935, (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    76. Photographic copy of historic photo, ca. 1935, (original print filed in Record Group 115, National Archives, Washington, D.C.). CCC ENROLLEES PLACING ROCK RIPRAP ON UPSTREAM FACE OF DEER FLAT DAM TO PREVENT EROSION OF EARTH FILL BY WIND AND WAVE ACTION-BIOSE FEDERAL RECLAMATION PROJECT-IDAHO. - Boise Project, Deer Flat Embankments, Lake Lowell, Nampa, Canyon County, ID

  6. Elucidating carbon sources driving microbial metabolism during oil sands reclamation.

    PubMed

    Bradford, Lauren M; Ziolkowski, Lori A; Goad, Corey; Warren, Lesley A; Slater, Gregory F

    2017-03-01

    Microbial communities play key roles in remediation and reclamation of contaminated environments via biogeochemical cycling of organic and inorganic components. Understanding the trends in in situ microbial community abundance, metabolism and carbon sources is therefore a crucial component of effective site management. The focus of this study was to use radiocarbon analysis to elucidate the carbon sources driving microbial metabolism within the first pilot wetland reclamation project in the Alberta oil sands region where the observation of H 2 S had indicated the occurrence of microbial sulphate reduction. The reclamation project involved construction of a three compartment system consisting of a freshwater wetland on top of a sand cap overlying a composite tailings (CT) deposit. Radiocarbon analysis demonstrated that both dissolved and sediment associated organic carbon associated with the deepest compartments (the CT and sand cap) was primarily fossil (Δ 14 C = -769 to -955‰) while organic carbon in the overlying peat was hundreds to thousands of years old (Δ 14 C = -250 to -350‰). Radiocarbon contents of sediment associated microbial phospholipid fatty acids (PLFA) were consistent with the sediment bulk organic carbon pools (Peat: Δ 14 C PLFA  = -257‰; Sand cap Δ 14 C PLFA  = -805‰) indicating that these microbes were using sediment associated carbon. In contrast, microbial PLFA grown on biofilm units installed in wells within the deepest compartments contained much more modern carbon that the associated bulk carbon pools. This implied that the transfer of relatively more modern carbon was stimulating the microbial community at depth within the system. Correlation between cellular abundance estimates based on PLFA concentrations and the Δ 14 C PLFA indicated that the utilization of this more modern carbon was stimulating the microbial community at depth. These results highlight the importance of understanding the occurrence and potential outcomes of the introduction of relatively bioavailable carbon to mine wastes in order to predict and manage the performance of reclamation strategies. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. 30 CFR 901.25 - Approval of Alabama abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 1990 Emergency program. June 26, 1992 January 12, 1993 Ranking and selection of AML projects. October 1, 1993 June 30, 1994 Eligibility and definition of AML. December 5, 1994 August 15, 1995 Ranking and...

  8. New Technologies to Reclaim Arid Lands User's Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. K. Ostler

    2002-10-01

    Approximately 70 percent of all U.S. military training lands are located in arid and semi-arid areas. Training activities in such areas frequently adversely affect vegetation, damaging plants and reducing the resilience of vegetation to recover once disturbed. Fugitive dust resulting from a loss of vegetation creates additional problems for human health, increasing accidents due to decreased visibility, and increasing maintenance costs for roads, vehicles, and equipment. Under conventional technologies to mitigate these impacts, it is estimated that up to 35 percent of revegetation projects in arid areas will fail due to unpredictable natural environmental conditions, such as drought, and reclamationmore » techniques that were inadequate to restore vegetative cover in a timely and cost-effective manner. New reclamation and restoration techniques are needed in desert ranges to help mitigate the adverse effects of military training and other activities to arid-land environments. In 1999, a cooperative effort between the U.S. Department of Energy (DOE), the US. Department of Defense (DoD), and selected university scientists was undertaken to focus on mitigating military impacts in arid lands. As arid lands are impacted due to DoD and DOE activities, biological and soil resources are gradually lost and the habitat is altered. A conceptual model of that change in habitat quality is described for varying levels of disturbance in the Mojave Desert. As the habitat quality degrades and more biological and physical resources are lost from training areas, greater costs are required to return the land to sustainable levels. The purpose of this manual is to assist land managers in recognizing thresholds associated with habitat degradation and provide reclamation planning and techniques that can reduce the costs of mitigation for these impacted lands to ensure sustainable use of these lands. The importance of reclamation planning is described in this manual with suggestions about establishing project objectives, scheduling, budgeting, and selecting cost-effective techniques. Reclamation techniques include sections describing: (1) erosion control (physical, chemical, and biological), (2) site preparation, (3) soil amendments, (4) seeding, (5) planting, (6) grazing and weed control, (7) mulching, (8) irrigation, and (9) site protection. Each section states the objectives of the technique, the principles, an in-depth look at the techniques, and any special considerations as it relates to DoD or DOE lands. The need for monitoring and remediation is described to guide users in monitoring reclamation efforts to evaluate their cost-effectiveness. Costs are provided for the proposed techniques for the major deserts of the southwestern U.S. showing the average and range of costs. A set of decision tools are provided in the form of a flow diagram and table to guide users in selecting effective reclamation techniques to achieve mitigation objectives. Recommendations are provided to help summarize key reclamation principles and to assist users in developing a successful program that contributes to sustainable uses of DoD and DOE lands. The users manual is helpful to managers in communicating to installation management the needs and consequences of training decisions and the costs required to achieve successful levels of sustainable use. This users manual focuses on the development of new reclamation techniques that have been implemented at the National Training Center at Fort Irwin, California, and are applicable to most arid land reclamation efforts.« less

  9. Concept of an innovative water management system with decentralized water reclamation and cascading material-cycle for agricultural areas.

    PubMed

    Fujiwara, T

    2012-01-01

    Unlike in urban areas where intensive water reclamation systems are available, development of decentralized technologies and systems is required for water use to be sustainable in agricultural areas. To overcome various water quality issues in those areas, a research project entitled 'Development of an innovative water management system with decentralized water reclamation and cascading material-cycle for agricultural areas under the consideration of climate change' was launched in 2009. This paper introduces the concept of this research and provides detailed information on each of its research areas: (1) development of a diffuse agricultural pollution control technology using catch crops; (2) development of a decentralized differentiable treatment system for livestock and human excreta; and (3) development of a cascading material-cycle system for water pollution control and value-added production. The author also emphasizes that the innovative water management system for agricultural areas should incorporate a strategy for the voluntary collection of bio-resources.

  10. 43 CFR 418.32 - Cooperative programs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Water... cooperatively to develop a water management and conservation program to promote efficient management of water in..., to improve the District's operations and procedures for greater water delivery conservation. (b) The...

  11. 43 CFR 418.32 - Cooperative programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Water Management... cooperatively to develop a water management and conservation program to promote efficient management of water in..., to improve the District's operations and procedures for greater water delivery conservation. (b) The...

  12. 43 CFR 418.32 - Cooperative programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Water... cooperatively to develop a water management and conservation program to promote efficient management of water in..., to improve the District's operations and procedures for greater water delivery conservation. (b) The...

  13. 43 CFR 418.32 - Cooperative programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Water... cooperatively to develop a water management and conservation program to promote efficient management of water in..., to improve the District's operations and procedures for greater water delivery conservation. (b) The...

  14. 43 CFR 418.32 - Cooperative programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Water... cooperatively to develop a water management and conservation program to promote efficient management of water in..., to improve the District's operations and procedures for greater water delivery conservation. (b) The...

  15. 25 CFR 162.559 - Must a lessee provide a performance bond for a WSR lease?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... maintenance charges for any land located within an irrigation project; and (4) The restoration and reclamation... interest. (g) For tribal land, we will defer to the tribe's determination that a waiver of the performance...

  16. 25 CFR 162.559 - Must a lessee provide a performance bond for a WSR lease?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... maintenance charges for any land located within an irrigation project; and (4) The restoration and reclamation... interest. (g) For tribal land, we will defer to the tribe's determination that a waiver of the performance...

  17. Effects of surface coal mining and reclamation on ground water in small watersheds in the Allegheny Plateau, Ohio

    USGS Publications Warehouse

    Eberle, Michael; Razem, A.C.

    1985-01-01

    The hydrologic effects of surface coal mining in unlimited areas is difficult to predict, partly because of a lack of adequate data collected before and after mining and reclamation. In order to help provide data to assess the effects of surface mining on the hydrology of small basins in the coal fields of the eastern United States, the U.S. Bureau of Mines sponsored a comprehensive hydrologic study at three sites in the Ohio part of the Eastern Coal Province. These sites are within the unqlaciated part of the Allegheny Plateau, and are representative of similar coal-producing areas in Kentucky, West Virginia, and Pennsylvania. The U.S. Geological Survey was responsible for the ground-water phase of the study. The aquifer system at each watershed consisted of two localized perched aquifers (top and middle) above a deeper, more regional aquifer. The premining top aquifer was destroyed by mining in each case, and was replaced by spoils during reclamation. The spoils formed new top aquifers that were slowly becoming resaturated at the end of the study period. Water levels in the aquifers were about the same after reclamation as before mining, although levels rose in a few places. It appears that the underclay at the base of the new top aquifers at all three sites prevents significant downward leakage from the top aquifers to lower except in places where the layer may have been damaged during mining. Water in the top aquifers is a calcium sulfate type, whereas calcium bicarbonate type water predominated before mining. The median specific conductance of water in the new top aquifers was about 5 times greater than that of the original top aquifers in two of the watersheds, and 1 1/2 times the level of the original top aquifers in the third. Concentrations of dissolved sulfate, iron, and manganese in the top aquifers before mining generally did not exceed U.S. and Ohio Environmental Protection Agency drinking-water limits, but generally exceeded these limits after reclamation. Water-quality changes in the middle aquifers were minor by comparison. Water levels and water quality in the deeper, regional aquifers were unaffected by mining.

  18. Hibernacula selection by Townsend's big-eared bat in Southwestern Colorado

    USGS Publications Warehouse

    Hayes, Mark A.; Schorr, Robert A.; Navo, Kirk W.

    2011-01-01

    In western United States, both mine reclamations and renewed mining at previously abandoned mines have increased substantially in the last decade. This increased activity may adversely impact bats that use these mines for roosting. Townsend's big-eared bat (Corynorhinus townsendii) is a species of conservation concern that may be impacted by ongoing mine reclamation and renewed mineral extraction. To help inform wildlife management decisions related to bat use of abandoned mine sites, we used logistic regression, Akaike's information criterion, and multi-model inference to investigate hibernacula use by Townsend's big-eared bats using 9 years of data from surveys inside abandoned mines in southwestern Colorado. Townsend's big-eared bats were found in 38 of 133 mines surveyed (29%), and occupied mines averaged 2.6 individuals per mine. The model explaining the most variability in our data included number of openings and portal temperature at abandoned mines. In southwestern Colorado, we found that abandoned mine sites with more than one opening and portal temperatures near 0°C were more likely to contain hibernating Townsend's big-eared bats. However, mines with only one opening and portal temperatures of ≥10°C were occasionally occupied by Townsend's big-eared bat. Understanding mine use by Townsend's big-eared bat can help guide decisions regarding allocation of resources and placement of bat-compatible closures at mine sites scheduled for reclamation. When feasible we believe that surveys should be conducted inside all abandoned mines in a reclamation project at least once during winter prior to making closure and reclamation recommendations.

  19. 51. McMILLAN DAM Photographic copy of historic photo, 1937 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. McMILLAN DAM - Photographic copy of historic photo, 1937 (original print filed in Work Projects Misc., File E, National Archives, Washington, D.C.) photographer unknown 'CCC ENROLLEES RECONSTRUCTING McMILLAN DAM ON PECOS RIVER DAMAGED BY FLOODS - CARLSBAD FEDERAL RECLAMATION PROJECT, NEW MEXICO' - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  20. Spatial variability of heavy metals in the coastal soils under long-term reclamation

    NASA Astrophysics Data System (ADS)

    Wang, Lin; Coles, Neil A.; Wu, Chunfa; Wu, Jiaping

    2014-12-01

    The coastal plain of Cixi City, China, has experienced over 1000 years of reclamation. With the rapid development of agriculture and industry after reclamation, successive inputs into agricultural soils have drastically modified the soil environment. To determine the spatial distribution of heavy metals and to evaluate the influence of anthropogenic activities, a total of 329 top soil samples were taken along a transect on the coastal plain. The samples collected across 11 sea dikes, were selected by a nested sampling methodology. Total Cu, Fe, Mn, Ni, Pb, and Zn concentrations, as well as their diethylenetriamine penta-acetic acid (DTPA) extractable (available) concentrations were determined. Results indicated that except for Zn concentrations, there was neither heavy metals pollution nor mineral deficiency in the soils. Heavy metals exhibited considerable spatial variability, obvious spatial dependence, and close relationships on the reclaimed land. For most metals, the reclamation history was the main influencing factor. Metals concentrations generally showed discontinuities around the position of sea dikes, and the longer reclamation histories tended to have higher metals concentrations than the recently reclaimed sectors. As for Cu and Zn total concentrations, stochastic factors, like industrial waste discharge, fertilization and pesticide application, probably led to the high nugget effect and altered this relationship. The 6th and 10th zones generally had the highest total metals concentrations, due to the concentration of household appliance manufacturers in these reclaimed areas. The first two zones were characterized by high available metals concentrations, probably due to the alternant flooding and emergence, low pH values and high organic matter contents in these paddy field soils. From the 3rd to 7th zones with the same land use history and soil type, metals concentrations, especially available concentrations, showed homogeneity. The nested sampling method adopted demonstrated that the 500-m interval was enough to capture the spatial variation of the metals. These results were useful in evaluating the variation in the environment quality of the soils under long-term reclamation and to formulate plans for future reclamation projects.

  1. Waste Not Want Not: Water Reuse and Recycling in Texas

    EPA Pesticide Factsheets

    The Texas Water Development Board has provided more than $300 million to over 28 projects using its CWSRF to fund a diversification of water reclamation, reuse and supply development solutions to augment community resiliency in the face of drought events.

  2. 43 CFR 422.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CLEO) means the highest level duly authorized law enforcement officer for a non-Department law enforcement agency. (f) Law Enforcement Officer means: (1) A duly authorized Federal law enforcement officer... LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.2 Definitions. (a) Department means...

  3. Phosphorus reclamation through hydrothermal carbonization of animal manures

    USDA-ARS?s Scientific Manuscript database

    Projected shortages of global phosphate have prompted investigation of methods that could be employed to capture and recycle phosphate, rather than continue to allow the resource to be essentially irreversibly lost through dilution in surface waters. Hydrothermal carbonization of animal manures from...

  4. Assessment of design parameters and construction requirements for full depth reclamation projects with cement.

    DOT National Transportation Integrated Search

    2015-02-01

    The ability to efficiently rehabilitate and maintain the State of Vermonts Highway infrastructure in a : cost-effective manner is a daunting task. Historically, pavement overlay treatments were specified : because it was a rapid low cost solution ...

  5. Landfill aeration in the framework of a reclamation project in Northern Italy.

    PubMed

    Raga, Roberto; Cossu, Raffaello

    2014-03-01

    In situ aeration by means of the Airflow technology was proposed for landfill conditioning before landfill mining in the framework of a reclamation project in Northern Italy. A 1-year aeration project was carried out on part of the landfill with the objective of evaluating the effectiveness of the Airflow technology for landfill aerobization, the evolution of waste biological stability during aeration and the effects on leachate and biogas quality and emissions. The main outcomes of the 1-year aeration project are presented in the paper. The beneficial effect of the aeration on waste biological stability was clear (63% reduction of the respiration index); however, the effectiveness of aeration on the lower part of the landfill is questionable, due to the limited potential for air migration into the leachate saturated layers. During the 1-year in situ aeration project approx. 275 MgC were discharged from the landfill body with the extracted gas, corresponding to 4.6 gC/kgDM. However, due to the presence of anaerobic niches in the aerated landfill, approx. 46% of this amount was extracted as CH4, which is higher than reported in other aeration projects. The O2 conversion quota was lower than reported in other similar projects, mainly due to the higher air flow rates applied. The results obtained enabled valuable recommendations to be made for the subsequent application of the Airflow technology to the whole landfill. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. Effects of surface coal mining and reclamation on the geohydrology of six small watersheds in west-central Indiana

    USGS Publications Warehouse

    Martin, Jeffrey D.; Duwelius, Richard F.; Crawford, Charles G.

    1987-01-01

    The watersheds studied include mined and reclaimed; mined and unreclaimed; and unmined, agricultural land uses, and are each < 3 sq mi in area. Surface water, groundwater, and meteorologic data for the 1981 and 1982 water years were used to describe and compare hydrologic systems of the six watersheds and to identify hydrologic effects of mining and reclamation. Peak discharges were greater at the agricultural watersheds than at the unreclaimed watersheds, primarily because of large final-cut lakes in the unreclaimed watersheds. Annual runoff was greatest at the unreclaimed watersheds, intermediate at the agricultural watersheds, and least at the reclaimed watersheds. Hydrologic effects of mining were identified by comparing the hydrologic systems at mined and unreclaimed watersheds with those at unmined, agricultural watersheds. Comparisons of the hydrologic systems of these watersheds indicate that surface coal mining without reclamation has the potential to increase annual runoff, base flow, and groundwater recharge to the bedrock; reduce peak flow rates and variation in flow; lower the water table in upland areas; change the relation between surface water and groundwater divides; and create numerous, local flow systems in the shallow groundwater. Hydrologic effects of reclamation were identified by comparing the hydrologic systems at mined and reclaimed watersheds with those at mined and unreclaimed watersheds. Reclamation has the potential to decrease annual runoff, base flow, and recharge to the bedrock; increase peak flow rates, variation in flow, and response to thunderstorms; reestablish the premining relation between surface and groundwater divides; and create fewer local flow systems in the shallow groundwater. (Lantz-PTT)

  7. A New Data Acquisition Portal for the Sacramento River Settlement Contractors

    NASA Astrophysics Data System (ADS)

    Narlesky, P. E., C. A.; Williams, P. E., A. M.

    2017-12-01

    In 1964, the United States Bureau of Reclamation (Reclamation) executed settlement contracts with the Sacramento River Settlement Contractors (SRSC), entities which hold water rights along the Sacramento River with area of origin protection or that are senior to Reclamation's water rights for Shasta Reservoir. Shasta is the cornerstone of the federal Central Valley Project (CVP), one of the nation's largest multi-purpose water conservation programs. In order to optimize CVP operations for multiple beneficial uses including water supply, fisheries, water quality, and waterfowl habitat, the SRSC voluntarily agreed to adaptively manage diversions throughout the year in close coordination with Reclamation. MBK Engineers assists the SRSC throughout this process by collecting, organizing, compiling, and distributing diversion data to Reclamation and others involved in operational decisions related to Shasta Reservoir and the CVP. To improve and expand participation in diversions reporting, we have developed the SRSC Web Portal, which launches a data-entry dashboard for members of the SRSC to facilitate recording and transmittal of both predicted and observed monthly and daily flow diversion data. This cloud-hosted system leverages a combination of Javascript interactive visualization libraries with a database-backed Python web framework to present streamlined data-entry forms and valuable SRSC program summary illustrations. SRSC program totals, which can now be aggregated through queries to the web-app's database backend, are used by Reclamation, SRSC, fish agencies, and others to inform operational decisions. By submitting diversion schedules and tracking actual diversions through the portal, contractors will also be directly contributing to the development of a richer and more consistently-formatted historical record for demand hydrology in the Sacramento River Watershed; this may be useful in future water supply studies. Adoption of this technology will foster an increased appreciation for the historical record of individual and combined Sacramento River diversions relative to the overall system.

  8. Wash water reclamation technology for advanced manned spacecraft

    NASA Technical Reports Server (NTRS)

    Putnam, D. F.

    1977-01-01

    The results of an analytical study and assessment of state-of-the-art wash water reclamation technology for advanced manned spacecraft is presented. All non-phase-change unit operations, unit processes, and subsystems currently under development by NASA are considered. Included among these are: filtration, ultrafiltration, carbon adsorption, ion exchange, chemical pretreatment, reverse osmosis, hyperfiltration, and certain urea removal techniques. Performance data are given together with the projected weights and sizes of key components and subsystems. In the final assessment, a simple multifiltration approach consisting of surface-type cartridge filters, carbon adsorption and ion exchange resins receives the highest rating for six-man orbital missions of up to 10 years in duration.

  9. Research on the application of satellite remote sensing to local, state, regional, and national programs involved with resource management and environmental quality

    NASA Technical Reports Server (NTRS)

    Walters, R. L.; Eastmond, R. J.; Barr, B. G.

    1973-01-01

    Project summaries and project reports are presented in the area of satellite remote sensing as applied to local, regional, and national environmental programs. Projects reports include: (1) Douglas County applications program; (2) vegetation damage and heavy metal concentration in new lead belt; (3) evaluating reclamation of strip-mined land; (4) remote sensing applied to land use planning at Clinton Reservoir; and (5) detailed land use mapping in Kansas City, Kansas.

  10. 43 CFR 404.56 - If a financial assistance agreement is entered into for a rural water supply project that...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true If a financial assistance agreement is entered into for a rural water supply project that benefits more than one Indian tribe, is the approval of each Indian tribe required? 404.56 Section 404.56 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF...

  11. 43 CFR 404.54 - Who will hold title to a rural water project that is constructed following the completion of an...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study under this program? 404.54 Section 404.54 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...

  12. 30 CFR 881.5 - Cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Cooperative agreements. 881.5 Section 881.5... ABANDONED MINE LAND RECLAMATION SUBSIDENCE AND STRIP MINE REHABILITATION, APPALACHIA § 881.5 Cooperative agreements. (a) Each project shall be covered by a cooperative agreement between the Government, as...

  13. Rehabilitating asphalt highways

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butalia, T.S.

    2007-07-01

    Coal fly ash has been used on two Ohio full-depth reclamation projects in Delaware and Warren. The object of the project carried out with the Department of Civil and Environmental Engineering and Geodetic Science at Ohio State University is to demonstrate the effective use of Class fly ash in combination with lime or lime kiln dust in the full depth reclamation of asphalt pavements. The article describes the mixes used for the highway reconstruction of part of Section Line Road Delaware County and of a road in Warren County. During construction the pavement sections were instrumented with several structural andmore » environmental monitoring devices and data is being collected on a quarterly basis. Falling Weight Deflectometer (FWD) tests to measure load defection behaviour, resilient of pavement layers and soil and base structural layer coefficient are being carried out twice a year. It was shown that use of fly ash increased the elastic modulus of base layers. This article first appeared in the Feb/May 2007 issue of Asphalt Contractor. 4 photos.« less

  14. The extent and historical trend of metal pollution recorded in core sediments from the artificial Lake Shihwa, Korea.

    PubMed

    Ra, Kongtae; Bang, Jae-Hyun; Lee, Jung-Moo; Kim, Kyung-Tae; Kim, Eun-Soo

    2011-08-01

    The vertical distribution of trace metals in sediment cores was investigated to evaluate the extent and the historical record of metal pollution over 30 years in the artificial Lake Shihwa in Korea. A marked increase of trace metals after 1980 was observed due to the operation of two large industrial complexes and dike construction for a reclamation project. There was a decreasing trend of metal concentrations with the distance from the pollution source. The enrichment factor and pollution load index of the metals indicated that the metal pollution was mainly derived from Cu, Zn and Cd loads due to anthropogenic activities. The concentrations of Cr, Ni, Cu, Zn, As and Pb in the upper part of all core sediments exceeded the ERL criteria of NOAA. Our results indicate that inadequate planning and management of industrialization and a large reclamation project accomplished by dike construction have continued to strongly accelerate metal pollution in Lake Shihwa. Crown Copyright © 2011. Published by Elsevier Ltd. All rights reserved.

  15. Surface-water quality of coal-mine lands in Raccoon Creek Basin, Ohio

    USGS Publications Warehouse

    Wilson, K.S.

    1985-01-01

    The Ohio Department of Natural Resources, Division of Reclamation, plans to reclaim abandoned surface mines in the Raccoon Creek watershed in southern Ohio. Historic water-quality data collected between 1975 and 1983 were complied and analyzed in terms of eight selected mine-drainage characteristics to develop a data base for individual subbasin reclamation projects. Areas of mine drainage affecting Raccoon Creek basin, the study Sandy Run basin, the Hewett Fork basin, and the Little raccoon Creek basin. Surface-water-quality samples were collected from a 41-site network from November 1 through November 3, 1983, Results of the sampling reaffirmed that the major sources of mine drainage to Raccoon Creek are in the Little Raccoon Creek basin, and the Hewett Fork basin. However, water quality at the mouth of Sandy Run indicated that it is not a source of mine drainage to Raccoon Creek. Buffer Run, Goose Run, an unnamed tributary to Little Raccoon Creek, Mulga Run, and Sugar Run were the main sources of mine drainage sampled in the Little Raccoon Creek basin. All sites sampled in the East Branch Raccoon Creek basin were affected by mine drainage. This information was used to prepare a work plan for additional data collection before, during, and after reclamation. The data will be used to define the effectiveness of reclamation effects in the basin.

  16. Reclamation and revegetation along a 250-mile 500 kV power line corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffith, E.F.

    1990-12-31

    Reclamation and revegetation success along the Montana Power Company Colstrip to Deepdale 500 kV powerline was monitored from 1985 through 1989. Followup revegetation was hampered by inadequate road and tower site earth work as a result of premature release of the reclamation bond. Drought conditions in 1985 and 1988 seriously affected revegetation efforts, especially on difficult sites. Weed control improved markedly, and all ROW areas are weed free except those next to infested range and cropland where a major cooperative effort is needed to control weeds. Access roads in previously unroaded areas resulted in changes of access, management practices, andmore » cattle grazing behavior, all of which adversely affected revegetation success. Erosion, exacerbated by undersized culverts, the presence of very erodible soils, the occasional untrained contractor, is now the major ROW maintenance concern. Observation of the revegetation efforts clearly shows the need for adequate and appropriate reclamation by qualified equipment operators up front, and a patient, measured effort of continued revegetation, weed control and erosion control over the long term. The bond period of 5 years may not be long enough to achieve the 90 percent revegetation success required by the permit. Future projects guidelines should consider look to a flexible timeframe and more realistic vegetation requirements to account for the effects of non-construction related impacts.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandt, C.A.; Rickard, W.H. Jr.; Hefty, M.G.

    This report describes the development of the reclamation project for the Hanford Site Near Surface Test Facility (NSTF), its implementation, and preliminary estimates of its success. The goal of the reclamation project is to return disturbed sites as nearly as practicable to their original conditions using native species. Gable Mountain is dominated by two plant communities: a big sagebrush (Artemisia tridentata) -- Sandberg's bluegrass (Poa sandbergii) community and a stiff sagebrush (Artemisia rigida) -- Sandberg's bluegrass community. Disassembly of the site installations began on March 15, 1988, and the site was returned to original contours by December 12, 1988. Twomore » separate revegetation methods were employed at the NSTF to meet differing site constraints. Vegetative cover and density in the revegetation plots were assessed in April 1989 and again in June 1989 and 1990. It is extremely unlikely that the sand pit, borrow pit, box cuts, generator pad area, or ventilation fan area will reach the reclamation objectives set for these areas within the next 50 years without further intervention. These areas currently support few living plants. Vegetation on revegetated native soils appears to be growing as expected. Vegetation growth on the main waterline is well below the objective. To date, no shrubs have grown on the area, growth of native grasses is well below the objective, and much of the area has been covered with the pit run material, which may not support adequate growth. Without further treatments, the areas without the pit run material will likely revert to a nearly pure cheatgrass condition. 44 refs., 13 figs., 7 tabs.« less

  18. Salinity Management in Agriculture

    USDA-ARS?s Scientific Manuscript database

    Existing guidelines and standards for reclamation of saline soils and management to control salinity exist but have not been updated for over 25 years. In the past few years a looming water scarcity has resulted in questioning of the long term future of irrigation projects in arid and semi arid regi...

  19. 76 FR 6786 - Notice of a Regional Project Waiver of Section 1605 (Buy American) of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... manufactured wafer swing check valves. The wafer swing check valves will be used for the filter feed pumps as... check valves will prevent backflow into the filter feed pumps at the Glen Water Reclamation Facility in...

  20. Reclamation of Wood Materials Coated with Lead-Based Paint

    DTIC Science & Technology

    2009-03-01

    Also, the contractor’s deconstruction process required more labor than expected, raising the total project cost. Finally, the scale of the project did...paint1 (LBP) makes the removal and disposal of de- bris from these buildings problematic in terms of both process and cost. “Smash-n-trash...the wood that it covered. Proprietary milling machines and processes can be used to economically reclaim the lead- contaminated wood, providing a

  1. 75 FR 24965 - Mormon Island Auxiliary Dam (MIAD) Modification Project, Sacramento and El Dorado Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... Folsom DS/FDR EIS/EIR considered several methods to modify MIAD to achieve Reclamation's risk standards... availability of the Final Supplemental Environmental Impact Statement/Environmental Impact Report (EIS/EIR). SUMMARY: Pursuant to the National Environmental Policy Act and the California Environmental Quality Act...

  2. 43 CFR 418.20 - Diversions from the Truckee River to Lahontan Reservoir, January through June.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Lahontan Reservoir, January through June. 418.20 Section 418.20 Public Lands: Interior Regulations Relating... FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Operations and Management § 418.20 Diversions from the Truckee River to Lahontan Reservoir, January through June. (a) Truckee River diversions through the...

  3. 43 CFR 418.21 - Diversion of Truckee River water to Lahontan Reservoir, July through December.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lahontan Reservoir, July through December. 418.21 Section 418.21 Public Lands: Interior Regulations... PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Operations and Management § 418.21 Diversion of Truckee River water to Lahontan Reservoir, July through December. Truckee River diversions through the...

  4. 43 CFR 418.22 - Future adjustments to Lahontan Reservoir storage targets.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RECLAMATION PROJECT, NEVADA Operations and Management § 418.22 Future adjustments to Lahontan Reservoir storage targets. (a) The Lahontan Reservoir storage targets must be adjusted to accommodate changes in... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Future adjustments to Lahontan Reservoir...

  5. 43 CFR 418.22 - Future adjustments to Lahontan Reservoir storage targets.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RECLAMATION PROJECT, NEVADA Operations and Management § 418.22 Future adjustments to Lahontan Reservoir storage targets. (a) The Lahontan Reservoir storage targets must be adjusted to accommodate changes in... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Future adjustments to Lahontan Reservoir...

  6. 43 CFR 418.21 - Diversion of Truckee River water to Lahontan Reservoir, July through December.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Lahontan Reservoir, July through December. 418.21 Section 418.21 Public Lands: Interior Regulations... PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Operations and Management § 418.21 Diversion of Truckee River water to Lahontan Reservoir, July through December. Truckee River diversions through the...

  7. 43 CFR 418.20 - Diversions from the Truckee River to Lahontan Reservoir, January through June.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lahontan Reservoir, January through June. 418.20 Section 418.20 Public Lands: Interior Regulations Relating... FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Operations and Management § 418.20 Diversions from the Truckee River to Lahontan Reservoir, January through June. (a) Truckee River diversions through the...

  8. 43 CFR 431.5 - Cost data and fund requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Cost data and fund requirements. 431.5..., DEPARTMENT OF THE INTERIOR GENERAL REGULATIONS FOR POWER GENERATION, OPERATION, MAINTENANCE, AND REPLACEMENT AT THE BOULDER CANYON PROJECT, ARIZONA/NEVADA § 431.5 Cost data and fund requirements. Reclamation...

  9. 43 CFR 402.10 - Patent.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Patent. 402.10 Section 402.10 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.10 Patent. When a purchaser has complied fully... and patent and shall state the statutory authority for such liens. The receipt shall be submitted to...

  10. 43 CFR 402.10 - Patent.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Patent. 402.10 Section 402.10 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.10 Patent. When a purchaser has complied fully... and patent and shall state the statutory authority for such liens. The receipt shall be submitted to...

  11. 43 CFR 402.10 - Patent.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Patent. 402.10 Section 402.10 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.10 Patent. When a purchaser has complied fully... and patent and shall state the statutory authority for such liens. The receipt shall be submitted to...

  12. 43 CFR 402.10 - Patent.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Patent. 402.10 Section 402.10 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.10 Patent. When a purchaser has complied fully... and patent and shall state the statutory authority for such liens. The receipt shall be submitted to...

  13. 43 CFR 402.10 - Patent.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Patent. 402.10 Section 402.10 Public Lands... LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.10 Patent. When a purchaser has complied fully... and patent and shall state the statutory authority for such liens. The receipt shall be submitted to...

  14. Bureau of Reclamation Small Conduit Hydropower Development and Rural Jobs Act of 2012

    THOMAS, 112th Congress

    Rep. Tipton, Scott R. [R-CO-3

    2011-09-06

    Senate - 09/19/2012 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 112-624. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  15. 30 CFR 795.11 - Assistance funding.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Assistance funding. 795.11 Section 795.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL... funding. (a) Use of funds. Funds specifically authorized for this program shall be used to provide the...

  16. 30 CFR 795.11 - Assistance funding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Assistance funding. 795.11 Section 795.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL... funding. (a) Use of funds. Funds specifically authorized for this program shall be used to provide the...

  17. 30 CFR 795.11 - Assistance funding.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Assistance funding. 795.11 Section 795.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL... funding. (a) Use of funds. Funds specifically authorized for this program shall be used to provide the...

  18. 30 CFR 795.11 - Assistance funding.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Assistance funding. 795.11 Section 795.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SMALL... funding. (a) Use of funds. Funds specifically authorized for this program shall be used to provide the...

  19. 8. Photographic copy of photograph. (Source: Department of Interior. Bureau ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of photograph. (Source: Department of Interior. Bureau of Reclamation. Bitterroot Project History 1931-1962. National Archives, Denver, RG 115, Accession #115-90-039, Box 243) Photographer unknown. View of original rock-fill crib diversion structure, September 13, 1949. Diversion and head works for big ditch on Rock Creek. - Bitter Root Irrigation Project, Rock Creek Diversion Dam, One mile east of Como Dam, west of U.S. Highway 93, Darby, Ravalli County, MT

  20. Spatiotemporal heterogeneity in densities of the Taiwanese humpback dolphin (Sousa chinensis taiwanensis)

    NASA Astrophysics Data System (ADS)

    Dares, Lauren E.; Araújo-Wang, Claryana; Yang, Shih Chu; Wang, John Y.

    2017-03-01

    The inshore, estuarine distribution of Taiwanese humpback dolphins (THD) along the west coast of Taiwan puts them in direct conflict with many anthropogenic activities. We investigated the influence of environmental factors (depth, sea surface temperature (SST), salinity and distance to the nearest freshwater source) and coastal developments on THD density. Clear heterogeneity in density was found across the range of the THD, and there was significant spatial and temporal variation in mean densities. Density was not directly related to any environmental factors examined, which may be due to temporal variability and hydrological and oceanographic conditions that create, in effect, a continuous river delta along the central west coast of Taiwan rather than isolated, separate river estuaries. A high abundance of dolphins per unit of survey effort (DPUE) and mother-calf pairs per unit of survey effort (MCPUE) were found in waters adjacent to major coastal developments in which shallow waters had been filled to create new land (reclamation areas), but neither distance to reclamation area nor distance to the nearest river were found to be significant predictors of density. Most reclamation projects in THD habitat are situated near the mouths of major rivers or result in the creation of artificial confluences of smaller rivers, streams and other freshwater outlets, such as waste outflows. Thus, dolphins appear to use these areas in the absence of high quality natural habitat that has been lost to large-scale coastal reclamation throughout their range.

  1. 76 FR 12852 - Louisiana Regulatory Program/Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 918... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are...

  2. 75 FR 60373 - Louisiana Regulatory Program/Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 918... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule... of Surface Mining Reclamation and Enforcement (OSM), are announcing receipt of a proposed amendment...

  3. 75 FR 22423 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ...: Reopening of comment period for review of the Pick-Sloan Missouri Basin Program, Eastern and Western... reopening the comment period for the Pick-Sloan Missouri Basin Program, Eastern and Western Division... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  4. 78 FR 72109 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, Denver... contract for the delivery of project water for authorized uses in newspapers of general circulation in the...

  5. 78 FR 72111 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, [[Page 72112... actions for any contract for the delivery of project water for authorized uses in newspapers of general...

  6. Popular Music, Television, and Generational Identity.

    ERIC Educational Resources Information Center

    Burns, Gary

    Although previous generations have by no means been disloyal to the popular music of their youth, the tenacious attachment of the Baby Boomers to the music of the 1960s seems unprecedented. Three main reasons account for this constantly widening musical reclamation project. First, the Baby Boomers have a clearer sense of generational identity that…

  7. Photographic copy of photograph, Walter Lubken, photographer, 1908 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, Walter Lubken, photographer, 1908 (original print located at U.S. Bureau of Reclamation Pacific Northwest Regional Office, Boise, Idaho). GOVERNMENT FORCES CONSTRUCTION CAMP AT THE BOISE RIVER DIVERSION DAMSITE BEFORE BEGINNING OF CONSTRUCTION ON DIVERSION STRUCTURE - Boise Project, Boise River Diversion Dam, Across Boise River, Boise, Ada County, ID

  8. 43 CFR 10005.12 - Policy regarding the scope of measures to be included in the plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... used repeatedly throughout the Act and committee reports accompanying the Act. The importance of these... environmental impacts associated with a Federal reclamation project or, should impact occur, to protect, restore... involve protection, restoration, or enhancement of a similar resource value at a different location...

  9. 43 CFR 10005.12 - Policy regarding the scope of measures to be included in the plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... used repeatedly throughout the Act and committee reports accompanying the Act. The importance of these... environmental impacts associated with a Federal reclamation project or, should impact occur, to protect, restore... involve protection, restoration, or enhancement of a similar resource value at a different location...

  10. 43 CFR 10005.12 - Policy regarding the scope of measures to be included in the plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... used repeatedly throughout the Act and committee reports accompanying the Act. The importance of these... environmental impacts associated with a Federal reclamation project or, should impact occur, to protect, restore... involve protection, restoration, or enhancement of a similar resource value at a different location...

  11. 43 CFR 404.4 - What are the goals of the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.4 What are the goals of the program? The goals of the program are to: (a) Assess and address urgent and compelling rural water supply... perspective to water resources management in planning rural water supply projects; (c) Develop solutions to...

  12. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  13. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  14. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  15. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  16. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River in Lewis and Clark and Teton...

  17. 43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAM Feasibility Studies § 404.50 What information will be included in the feasibility report prepared... determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project should be authorized for construction, and the reasons supporting the recommendation. This recommendation...

  18. 76 FR 74074 - Final Environmental Impact Statement for the Windy Gap Firming Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-30

    ... Chimney Hollow Reservoir, pre-positioning of Colorado-Big Thompson (C-BT) water in the new reservoir, and a new pipeline to convey water to the reservoir from existing C-BT facilities. DATES: Reclamation... (Proposed Action) described in the Final EIS includes: Construction of Chimney Hollow Reservoir (90,000 acre...

  19. 43 CFR 431.7 - Administration and management of the Colorado River Dam Fund.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Colorado River Dam Fund. 431.7 Section 431.7 Public Lands: Interior Regulations Relating to Public Lands... management of the Colorado River Dam Fund. Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund...

  20. 43 CFR 431.7 - Administration and management of the Colorado River Dam Fund.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Colorado River Dam Fund. 431.7 Section 431.7 Public Lands: Interior Regulations Relating to Public Lands... management of the Colorado River Dam Fund. Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund...

  1. 43 CFR 431.7 - Administration and management of the Colorado River Dam Fund.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Colorado River Dam Fund. 431.7 Section 431.7 Public Lands: Interior Regulations Relating to Public Lands... management of the Colorado River Dam Fund. Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund...

  2. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION AND OPERATION PLAN § 780.27 Reclamation plan: Surface mining near underground mining. For surface... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Surface mining near... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  3. 43 CFR 429.33 - What are the consequences for using Reclamation land, facilities, and waterbodies without...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reclamation land, facilities, and waterbodies without authorization? 429.33 Section 429.33 Public Lands... BUREAU OF RECLAMATION LAND, FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.33 What are the consequences for using Reclamation land...

  4. 76 FR 76104 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 904... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and...

  5. 77 FR 55430 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 904... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and...

  6. 43 CFR 3601.40 - Mining and reclamation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mining and reclamation plans. 3601.40... Materials Disposal; General Provisions Mining and Reclamation Plans § 3601.40 Mining and reclamation plans. BLM may require you to submit mining and reclamation plans before we begin any environmental review or...

  7. BUILDING MATERIALS RECLAMATION PROGRAM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. Weggel; Shen-En Chen; Helene Hilger

    2010-08-31

    This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisorymore » panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.« less

  8. Mid-term effects of mine soil reclamation by use of aided phytostabilization

    NASA Astrophysics Data System (ADS)

    Zornoza, Raúl; Faz, Ángel; Martínez-Martínez, Silvia; Acosta, Jose Alberto; Gómez, María Dolores; Yanardag, Ibrahim

    2014-05-01

    Abandoned tailing ponds show environmental and human health hazards by the transfer of heavy metals through erosion or leaching. To reduce these hazards, a reclamation strategy has been developed on a tailing pond based on aided phytostabilization. In 2011 marble mud and pig slurry were applied on the tailing pond surface. In spring 2012 thirteen native vegetal species were introduced. During two years (2012-2013) the evolution of different soil properties and the bioavailable fraction of the heavy metals Cd, Pb and Zn has been monitored. Results showed that pH, aggregates stability, organic carbon, nitrogen and cation exchange capacity increased with the application of the amendments and the development of vegetation, while the bioavailable fraction of the heavy metals drastically decreased (90-99%). Thus, the strategy followed resulted positive to reduce the availability of heavy metals, improving soil quality and fertility. These results are promising in areas with extractive activity of carbonated materials, since the generated wastes can be used for reclamation of soils affected with heavy metals, turning a waste into a by-product. Key words: amendments, geochemistry, heavy metals, mining, tailing pond. Acknowledgements: This work has been funded by the European Union LIFE+ project MIPOLARE (LIFE09 ENV/ES/000439).

  9. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program? This program addresses domestic, municipal, and industrial water...

  10. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  11. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  12. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  13. Bibliography of US geological survey reports on coal drilling and geophysical logging projects, and related reports on geologic uses, Powder River Basin, Montana and Wyoming, 1973-1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cathcart, J.D.

    1984-01-01

    This bibliography includes reports on coal drilling, geophysical logging projects, and related geologic uses, in the Powder River Basin of Montana and Wyoming. Reports on chemical analyses of Powder River Basin coals, coal quality, methane studies, and geotechnical studies are also included, as are EMRIA (Energy Mineral Rehabilitation Inventory and Analysis) reports on resource and potential reclamation of selected study areas in Montana and Wyoming.

  14. Wildlife associated with scoria outcrops: implications for reclamation of surface-mined lands

    Treesearch

    Mark A. Rumble

    1989-01-01

    Bird and mammal populations using scoria rock outcrop and adjacentsagebrush/grassland habitats were studied. Bird populations and bird species richness were greater in the outcrop habitats than in the surrounding sagebrush/grassland habitats. These differences were attributedto the structural features provided by the outcrops. Most, but not all, small mammal...

  15. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  16. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  17. 43 CFR 402.7 - Notice of sale.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Notice of sale. 402.7 Section 402.7 Public... SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.7 Notice of sale. The sale of lands at public auction under this part shall be administered by the Commissioner. Notice of such sales shall be...

  18. 30 CFR 874.17 - AML agency procedures for reclamation projects receiving less than 50 percent government funding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Characterize the site in terms of mine drainage, active slides and slide-prone areas, erosion and sedimentation... the site; (iv) Current and historic coal production in the area; and (v) Any known or anticipated interest in mining the site. (2) You must determine the likelihood that nearby or adjacent mining...

  19. 30 CFR 874.17 - AML agency procedures for reclamation projects receiving less than 50 percent government funding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Characterize the site in terms of mine drainage, active slides and slide-prone areas, erosion and sedimentation... the site; (iv) Current and historic coal production in the area; and (v) Any known or anticipated interest in mining the site. (2) You must determine the likelihood that nearby or adjacent mining...

  20. 30 CFR 874.17 - AML agency procedures for reclamation projects receiving less than 50 percent government funding.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Characterize the site in terms of mine drainage, active slides and slide-prone areas, erosion and sedimentation... the site; (iv) Current and historic coal production in the area; and (v) Any known or anticipated interest in mining the site. (2) You must determine the likelihood that nearby or adjacent mining...

  1. 30 CFR 874.17 - AML agency procedures for reclamation projects receiving less than 50 percent government funding.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Characterize the site in terms of mine drainage, active slides and slide-prone areas, erosion and sedimentation... the site; (iv) Current and historic coal production in the area; and (v) Any known or anticipated interest in mining the site. (2) You must determine the likelihood that nearby or adjacent mining...

  2. 30 CFR 874.17 - AML agency procedures for reclamation projects receiving less than 50 percent government funding.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Characterize the site in terms of mine drainage, active slides and slide-prone areas, erosion and sedimentation... the site; (iv) Current and historic coal production in the area; and (v) Any known or anticipated interest in mining the site. (2) You must determine the likelihood that nearby or adjacent mining...

  3. 43 CFR 10005.10 - Relationship of the plan to the authorities and responsibilities of other agencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., through management of the land and water upon which fish and wildlife depend, or, in the case of Federal... responsibility for operation and maintenance of mitigation and conservation features and to refrain from... Project Office, the Bureau of Reclamation, the Central Utah Water Conservancy District, the Fish and...

  4. 43 CFR 10005.10 - Relationship of the plan to the authorities and responsibilities of other agencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., through management of the land and water upon which fish and wildlife depend, or, in the case of Federal... responsibility for operation and maintenance of mitigation and conservation features and to refrain from... Project Office, the Bureau of Reclamation, the Central Utah Water Conservancy District, the Fish and...

  5. 43 CFR 10005.10 - Relationship of the plan to the authorities and responsibilities of other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., through management of the land and water upon which fish and wildlife depend, or, in the case of Federal... responsibility for operation and maintenance of mitigation and conservation features and to refrain from... Project Office, the Bureau of Reclamation, the Central Utah Water Conservancy District, the Fish and...

  6. 43 CFR 402.7 - Notice of sale.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Notice of sale. 402.7 Section 402.7 Public... SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.7 Notice of sale. The sale of lands at public auction under this part shall be administered by the Commissioner. Notice of such sales shall be...

  7. 43 CFR 402.7 - Notice of sale.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Notice of sale. 402.7 Section 402.7 Public... SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.7 Notice of sale. The sale of lands at public auction under this part shall be administered by the Commissioner. Notice of such sales shall be...

  8. 76 FR 33362 - Request for Interest in Lease Arrangement on Federal Lands, San Luis Project, Los Banos, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... (RFI). Reclamation is seeking interest from any entity or entities interested in developing a renewable..., water conservation, water recycling and reuse, and developing partnerships with our customers, states... nation is moving toward a clean-energy economy. Interior has been changing the way it does business by...

  9. 43 CFR 2524.6 - Desert-land entryman may proceed independently of Government irrigation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Desert-land entryman may proceed... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.6 Desert-land... that a desert-land entryman who owns a water right and reclaims the land embraced in his entry must...

  10. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  11. 43 CFR 2524.6 - Desert-land entryman may proceed independently of Government irrigation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Desert-land entryman may proceed... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.6 Desert-land... that a desert-land entryman who owns a water right and reclaims the land embraced in his entry must...

  12. 43 CFR 2524.6 - Desert-land entryman may proceed independently of Government irrigation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Desert-land entryman may proceed... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.6 Desert-land... that a desert-land entryman who owns a water right and reclaims the land embraced in his entry must...

  13. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  14. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  15. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  16. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  17. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  18. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  19. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  20. 43 CFR 2524.6 - Desert-land entryman may proceed independently of Government irrigation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Desert-land entryman may proceed... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.6 Desert-land... that a desert-land entryman who owns a water right and reclaims the land embraced in his entry must...

  1. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  2. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  3. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  4. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  5. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  6. Gila River Basin Native Fishes Conservation Program

    Treesearch

    Doug Duncan; Robert W. Clarkson

    2013-01-01

    The Gila River Basin Native Fishes Conservation Program was established to conserve native fishes and manage against nonnative fishes in response to several Endangered Species Act biological opinions between the Bureau of Reclamation and the U.S. Fish and Wildlife Service on Central Arizona Project (CAP) water transfers to the Gila River basin. Populations of some Gila...

  7. 43 CFR 426.25 - Reclamation audits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation audits. 426.25 Section 426.25... INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.25 Reclamation audits. Reclamation will conduct... reviews; (b) In-depth reviews; and (c) Audits. ...

  8. An integrated wastewater reuse concept combining natural reclamation techniques, membrane filtration and metal oxide adsorption.

    PubMed

    Sperlich, A; Zheng, X; Ernst, M; Jekel, M

    2008-01-01

    In a Sino-German research project, a sustainable water reclamation concept was developed for different applications of municipal water reuse at the Olympic Green 2008 in Beijing, China. Results from pilot-scale experiments in Beijing and Berlin show that selective nutrient removal by adsorption onto granular ferric hydroxide (GFH) after a membrane bioreactor (MBR) can maintain a total phosphorus concentration of <0.03 microg L(-1) P, thus preventing eutrophication of artificial lakes. Operation time of GFH adsorption columns can be extended by regeneration using sodium hydroxide solution. A subsequent ultrafiltration (UF) membrane after bank filtration creates an additional barrier for pathogens and allows for further urban reuse applications such as toilet flushing. Short term bank / bio-filtration prior to UF is shown to effectively remove biopolymers and reduce membrane fouling. Copyright IWA Publishing 2008.

  9. History of the Federal Interagency Sedimentation Project

    USGS Publications Warehouse

    Skinner, John V.

    1989-01-01

    Since 1939, the date of the Project's inception, the team has operated under the direction of two lead agencies - the U.S. Geological Survey and U.S. Army Corps of Engineers. The supporting agencies are the Agricultural Research Service, Bureau of Reclamation, U.S. Forest Service, Bureau of Land Management, Federal Highway Administration, and the Tennessee Valley Authority. Overall direction of the Project rests with the Subcommittee on Sedimentation, Interagency Advisory Committee on Water Data. The Project's goals focus on improving and maintaining the quality of fluvial sediment data by (1) developing sediment samplers, laboratory analyzers, and automatic gages (2) evaluating methods, (3) standardizing equipment and methods and (4) procuring, calibrating and selling equipment.

  10. An evaluation of marine traffic on the Chinese white dolphins

    NASA Astrophysics Data System (ADS)

    Lee, C.

    2016-12-01

    The proposed third runway reclamation project of Hong Kong airport will soon impact the surrounding population of Chinese white dolphins. According to the World Wide Fund for Nature (WWF), the size of the reclamation will be 650 hectares of land located to the north of the current airport platform. All of the necessary works will be conducted via the surrounding marine areas. During the construction period the dredging and reclamation activities will increase the risk of dolphins colliding with this extra marine traffic especially since this construction site is less than one kilometre away from the dolphin marine park of Sha Chau & Lung Kwu Chau. Furthermore, after the construction of the third runway, there will be a re-routing of Skypier Ferries and other high speed boats through this area. The dolphins will undoubtedly be disturbed. The increase in vessel traffic during the construction project will also generate sounds that may interfere with echolocation systems that dolphins rely on to navigate and fish. This further impact can be measured using underwater hydrophones that can record the boat noise as well as the dolphin clicks. The latter determines the presence or absence of dolphins. From this the impact of noise on dolphin populations can be determined by simply determining if the dolphins stay around during periods of high levels of underwater noise. The data presented is the result of several years of collection. A clear understanding of the conjunction of noises from the dolphins and marine traffic patterns for different times of the day will help determine the impact and offer the chance to change marine traffic patterns thus minimizing the adverse impact on the iconic Hong Kong white dolphins.

  11. 43 CFR 404.33 - How much Federal funding can Reclamation provide for the completion of a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.33 How much Federal funding can Reclamation provide for the completion...

  12. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.30 How much Federal funding can Reclamation provide for the completion...

  13. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.32 Can Reclamation reduce the non-Federal cost-share required for an...

  14. 43 CFR 404.43 - What process will Reclamation follow to determine if an appraisal investigation is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404.43 What process will Reclamation follow to determine if an...

  15. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.48 What process will Reclamation follow to determine if a...

  16. 43 CFR 404.34 - Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.34 Can Reclamation reduce the amount of non-Federal cost-share required...

  17. A look at trees and reclamation in Georgia

    Treesearch

    Sanford P. Darby

    1980-01-01

    The author briefly reviews Georgia's land reclamation requirements when rehabilitating mined lands with trees as one's reclamation objective. Techniques used to establish two plantations are used to raise several important issues which, if resolved, can result in increased tree planting and lower land reclamation cost.

  18. Bureau of Reclamation Small Conduit Hydropower Development and Rural Jobs Act

    THOMAS, 113th Congress

    Sen. Barrasso, John [R-WY

    2013-02-13

    Senate - 06/03/2013 By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-35. (All Actions) Notes: For further action, see H.R.678, which became Public Law 113-24 on 8/9/2013. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  19. The FLOWS (FAA-Lincoln Laboratory Operational Weather Studies) Automatic Weather Station Network in Operation.

    DTIC Science & Technology

    1987-03-26

    20o, there is little change in observed transmission with further increases in angle. A similar result, obtained by Naegeli (1953) for the small end...Reclamation, June (1983). MacCready, P.J., "Mean Wind Speed Measurements in Turbulence", J. Appl. Meteor., 5, pp. 219-225 (1966). Naegeli , W

  20. Energy research information system projects report, volume 5, number 1

    NASA Astrophysics Data System (ADS)

    Johnson, J.; Schillinger, L.

    1980-07-01

    The system (ERIS) provides an inventory of the energy related programs and research activities from 1974 to the present in the states of Montana, Nebraska, North Dakota, South Dakota and Wyoming. Areas of research covered include coal, reclamation, water resources, environmental impacts, socioeconomic impacts, energy conversion, mining methodology, petroleum, natural gas, oilshale, renewable energy resources, nuclear energy, energy conservation and land use. Each project description lists title, investigator(s), research institution, sponsor, funding, time frame, location, a descriptive abstract of the research and title reports and/or publications generated by the research. All projects are indexed by location, personal names, organizations and subject keywords.

  1. Minot, North Dakota: Oroville-Tonasket, Washington; and San Luis Valley project, Colorado - water resource legislation. Hearing before the Subcommittee on Water and Power of the Committee on Energy and Natural Resources, United States Senate, One Hundredth Congress, First Session on S. 641, S. 649, and S. 1549, August 5, 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-01-01

    The first bill, S. 641, would provide for the relief of the city of Minot, North Dakota. S. 641 was introduced by Senator Burdick and is cosponsored by the vice chairman of this subcommittee, Senator Conrad. The second bill would amend the Reclamation Authorization Act of 1976 to increase the authorization ceiling on the Oroville-Tonasket project in Washington State. S. 649 was introduced by Senator Evans, the ranking member of the subcommittee and is cosponsored by Senator Adams. The third measure, S. 1549, would increase the authorization ceiling for the Closed Basin Division of the San Luis Valley project inmore » Colorado, and was introduced by Senator Wirth, also a member of the subcommittee, and is cosponsored by Senator Armstrong. Copies of each bill are first included, followed by statements by: US Senators and Congressmen from the cognizant states; C. Dale Dwall, Commissioner, Bureau of Reclamation, Department of the Interior; George Christensen, major, Minot, North Dakota; Edward Kuhn, president Minot City Council; Richard B. Price, counsel Oroville-Tonasket Irrigation District; and Leland Robinson, board president, Oroville-Tonasket Irrigation District.« less

  2. 30 CFR 784.200 - Interpretive rules related to General Performance Standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION AND OPERATION PLAN § 784.200 Interpretive rules related to General Performance Standards. The... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... Surface Mining Reclamation and Enforcement. (a) Interpretation of § 784.15: Reclamation plan: Postmining...

  3. 31 CFR 235.5 - Reclamation amounts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Reclamation amounts. 235.5 Section 235.5 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE... ON DESIGNATED DEPOSITARIES § 235.5 Reclamation amounts. Amounts received by way of reclamation on...

  4. 43 CFR 402.8 - Terms of sale.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Terms of sale. 402.8 Section 402.8 Public... SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.8 Terms of sale. (a) Under the Acts of...., 375b through 375f) lands may be sold either for cash or upon deferred payments. A sale providing for...

  5. 43 CFR 402.8 - Terms of sale.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Terms of sale. 402.8 Section 402.8 Public... SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.8 Terms of sale. (a) Under the Acts of...., 375b through 375f) lands may be sold either for cash or upon deferred payments. A sale providing for...

  6. 43 CFR 402.8 - Terms of sale.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Terms of sale. 402.8 Section 402.8 Public... SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.8 Terms of sale. (a) Under the Acts of...., 375b through 375f) lands may be sold either for cash or upon deferred payments. A sale providing for...

  7. 77 FR 73651 - North Star Hydro Services, CA LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...), proposing to study the feasibility of the Marble Bluff Dam Hydropower Project to be located at the U.S. Bureau of Reclamation's Marble Bluff dam on the Truckee River, near Nixon, Washoe County, Nevada. The... east of the existing spillway of the Marble Bluff dam. Flow diverted at the sluice gate would be used...

  8. Suitability of Dredged Material for Reclamation of Surface-Mined Land. Ottawa, Illinois, Demonstration Project.

    DTIC Science & Technology

    1980-07-01

    the side of the support pipe in a convection- aspirated mounting fixture (Figure D1). D3 Data Reduction and Display 6. Raw data recorded on the magnetic...Corps of Engineers. IV. Series: United States. Waterways Experiment Station, Vicksburg, Miss. Technical report ; EL-80-7. TA7.W34 no.EL-80-7 VAP L.

  9. 78 FR 64553 - License Amendment Request for Homestake Mining Company of California, Grants Reclamation Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... amendment request, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as... the findings that the NRC must make to support the granting of a license amendment in response to the... the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the...

  10. 43 CFR 2524.1 - Conditions excusing entrymen from compliance with the desert-land laws.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... compliance with the desert-land laws. 2524.1 Section 2524.1 Public Lands: Interior Regulations Relating to... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.1 Conditions excusing entrymen from compliance with the desert-land laws. (a) By section 5 of the Act of June 27, 1906 (34 Stat...

  11. 43 CFR 2524.1 - Conditions excusing entrymen from compliance with the desert-land laws.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... compliance with the desert-land laws. 2524.1 Section 2524.1 Public Lands: Interior Regulations Relating to... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.1 Conditions excusing entrymen from compliance with the desert-land laws. (a) By section 5 of the Act of June 27, 1906 (34 Stat...

  12. 43 CFR 2524.1 - Conditions excusing entrymen from compliance with the desert-land laws.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... compliance with the desert-land laws. 2524.1 Section 2524.1 Public Lands: Interior Regulations Relating to... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.1 Conditions excusing entrymen from compliance with the desert-land laws. (a) By section 5 of the Act of June 27, 1906 (34 Stat...

  13. 43 CFR 2524.1 - Conditions excusing entrymen from compliance with the desert-land laws.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... compliance with the desert-land laws. 2524.1 Section 2524.1 Public Lands: Interior Regulations Relating to... (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.1 Conditions excusing entrymen from compliance with the desert-land laws. (a) By section 5 of the Act of June 27, 1906 (34 Stat...

  14. 77 FR 11523 - Bryant Mountain, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... and Commencing Pre-filing Process. b. Project No.: 13680-001. c. Dated Filed: December 21, 2011. d... Reclamation and private lands. g. Filed Pursuant to: 18 CFR Part 5 of the Commission's Regulations. h..., California, 94505, (925) 634-1550 or email at [email protected] . i. FERC Contact: Ryan Hansen at (202...

  15. A bill to amend the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior to participate in the City of Hermiston, Oregon, water recycling and reuse project, and for other purposes.

    THOMAS, 113th Congress

    Sen. Wyden, Ron [D-OR

    2013-04-10

    Senate - 07/15/2013 Placed on Senate Legislative Calendar under General Orders. Calendar No. 132. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  16. To amend the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior to participate in the City of Hermiston, Oregon, water recycling and reuse project, and for other purposes.

    THOMAS, 111th Congress

    Rep. Walden, Greg [R-OR-2

    2009-06-04

    Senate - 08/05/2010 Placed on Senate Legislative Calendar under General Orders. Calendar No. 545. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  17. 75 FR 36118 - Public Land Order No. 7743; Partial Revocation of Five Secretarial Orders for Reclamation Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... January 12, 1891, as amended by the Act of Congress dated March 1, 1907, to facilitate the issuance of a.... DATES: Effective Date: June 24, 2010. FOR FURTHER INFORMATION CONTACT: Duane Marti, Realty Specialist... amended by the Act of Congress dated March 1, 1907 (34 Stat. 1015, 1022), to facilitate the issuance of...

  18. Solar demonstration project in a fast-food restaurant

    NASA Astrophysics Data System (ADS)

    McClenahan, D.

    1980-11-01

    The results of a two-phase program in which the first phase included the successful use of heat reclamation equipment and energy conservation techniques at a typical fast-food restaurant are described. The project's second phase involved the engineering, designing, installation and interfacing of a solar collector system at the facility. The report will help to serve as a guide for other restaurants around the state, and possibly the nation, which wish to install energy saving systems, or adopt energy-saving techniques, geared to their special needs and equipment.

  19. Land application uses of dry FGD by-products. [Quarterly report, January 1, 1994--March 31, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dick, W.A.; Beeghly, J.H.

    1994-08-01

    This report contains three separate monthly reports on the progress to use flue gas desulfurization by-products for the land reclamation of an abandoned mine site in Ohio. Data are included on the chemical composition of the residues, the cost of the project, as well as scheduling difficulties and efforts to allay the fears of public officials as to the safety of the project. The use of by-products to repair a landslide on State Route 541 is briefly discussed.

  20. Combined effects of land reclamation, channel dredging upon the bioavailable concentration of polycyclic aromatic hydrocarbons (PAHs) in Victoria Harbour sediment, Hong Kong.

    PubMed

    Chan, J T K; Leung, H M; Yue, P Y K; Au, C K; Wong, Y K; Cheung, K C; Li, W C; Yung, K K L

    2017-01-15

    The up-to-date concentration of polycyclic aromatic hydrocarbons (PAHs) in sediment materials of Victoria Harbour was investigated so as to evaluate the pollution potential associated with the reclamation projects in Hong Kong. A total of 100 sediment samples were collected at 20 locations. Except the control point in reservoir, the PAHs concentrations were detectable levels all sites (131-628.3ng/g, dw) and such values were higher than Dutch Target and Intervention Values (the New Dutch standard in 2016). The PAHs concentration indicating that construction waste and wastewater discharges were the main pollutant sources. Results of correlation in single cell gel electrophoresis assay (comet assay) studies also revealed that the PAHs concentration was highly correlated (<0.01) with DNA migration (i.e. the length of tail moment of fish cells) in 5mg/ml of PAHs. The above observation indicates that the PAHs present in the sediment may substantially effect the marine ecosystem. Although the dredged sediment can be a useful sea-filling material for land reclamation; however, the continuing leaching of PAHs and its impact on the aquatic environment need to be studied further. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Geochemical investigations and interim recommendations for priority abandoned mine sites, BLM lands, upper Animas River watershed, San Juan County, Colorado

    USGS Publications Warehouse

    Nash, J. Thomas

    1999-01-01

    Field observations, sampling of mine dumps and mine drainage waters, and laboratory studies of dump materials have been made at mining areas deemed to be on public lands administered by the U. S. Bureau of Land Management (BLM) in the Upper Animas River watershed. Results of chemical analyses of dump materials, leachates of those materials, and surface waters draining mines or dumps provide indications of where acid is generated or consumed, and metal concentrations below mines or dumps. Information on sites previously identified as needing reclamation is reviewed and available geochemical information is used to rank 26 sites into four classes of priority for reclamation. Although there are more than a thousand mining sites (productive mines and prospects) on BLM lands in the Upper Animas River watershed study area, the majority are very small (less than about 70 cubic yards of dump material), are more than 2 miles from a major stream, or so inaccessible as to prohibit reclamation. In the summers of 1997 and 1998 approximately 200 sites were observed and more than 100 of these that appeared to have the potential to geochemically impact the watershed were examined more carefully and sampled. Building upon the prior work of the BLM and associated agencies, this work attempted to identify the most significant sources of mine-related contamination and to rank those sites as to priority for reclamation. These most significant mining areas have been examined within a geologic framework and were evaluated by multiple criteria, including tendency to generate acid and release toxic metals, observed damage to vegetation, potential to release metals based on leach tests, and likelihood of transport into streams of the watershed. No single measurable parameter, such as metal concentration, can be used to rank the sites. Rather, subjective estimates are required to evaluate combinations or interactions among several parameters. The most subjective estimate, while ranking feasibility of reclamation, is the relative amounts of naturally occurring metals and acidity and mine-related contamination at each mining area. Mitigation of natural contributions at mines or unmined areas is beyond the scope of my studies, but should be considered when planning reclamation. Available information for the 26 priority sites is adequate for ranking, but at some sites additional information on groundwater conditions is needed for a more complete site evaluation.

  2. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  3. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  4. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  5. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  6. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  7. 43 CFR 429.31 - What uses are prohibited on Reclamation land, facilities, and waterbodies?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... land, facilities, and waterbodies? 429.31 Section 429.31 Public Lands: Interior Regulations Relating to..., FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.31 What uses are prohibited on Reclamation land, facilities, and waterbodies? (a) Reclamation...

  8. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 784.15... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  9. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 780.23... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  10. 7 CFR 632.21 - Reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Reclamation plan. 632.21 Section 632.21 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Participation § 632.21 Reclamation plan. (a) Responsibility. Land users are responsible for developing a reclamation plan that will serve as a basis for a...

  11. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Surface mining near underground mining. 780.27 Section 780.27 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  12. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .../check_security_new.pdf. Institutions may contact the Fiscal Service Questioned Documents Branch at (202...) Reclamation debts are due to be paid upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest...

  13. Suspended-sediment transport and storage: A demonstration of acoustic methods in the evaluation of reservoir management strategies for a small water-supply reservoir in western Colorado

    USGS Publications Warehouse

    Williams, Cory A.; Richards, Rodney J.; Collins, Kent L.

    2015-01-01

    The U.S. Bureau of Reclamation (USBR) and local stakeholder groups are evaluating reservoir-management strategies within Paonia Reservoir. This small reservoir fills to capacity each spring and requires approximately half of the snowmelt-runoff volume from its sediment-laden source waters, Muddy Creek. The U.S. Geological Survey is currently conducting high-resolution (15-minute data-recording interval) sediment monitoring to characterize incoming and outgoing sediment flux during reservoir operations at two sites on Muddy Creek. The high-resolution monitoring is being used to establish current rates of reservoir sedimentation, support USBR sediment transport and storage models, and assess the viability of water-storage recovery in Paonia Reservoir. These sites are equipped with in situ, single-frequency, side-looking acoustic Doppler current meters in conjunction with turbidity sensors to monitor sediment flux. This project serves as a demonstration of the capability of using surrogate techniques to predict suspended-sediment concentrations in small streams (less than 20 meters in width and 2 meters in depth). These two sites provide the ability to report near real-time suspended-sediment concentrations through the U.S. Geological Survey National Water Information System (NWIS) web interface and National Real-Time Water Quality websites (NRTWQ) to aid in reservoir operations and assessments.

  14. Evaluation of the effects of coal-mine reclamation on water quality in Big Four Hollow near Lake Hope, southeastern Ohio

    USGS Publications Warehouse

    Nichols, V.E.

    1985-01-01

    A subsurface clay dike and mine-entrance hydraulic seals were constructed from July 1979 through May 1980 by the Ohio Department if Natural Resources, Division of Reclamation to reduce acidic mine drainage from abandoned drift-mine complex 88 into Big Four Hollow Creek. Big Four Hollow Creek flows into Sandy Run--the major tributary to Lake Hope. A data-collection program was established in 1979 by the U.S. Geological Survey to evaluate effects of drift-mine sealing on surface-water systems of the Big Four Hollow Creek and Sandy Run area just below the mine. Data collected by private consultants from 1970 through 1971 near the mouth of Big Four Hollow Creek (U.S. Geological Survey station 03201700) show that pH ranged from 2.7 to 4.8, with a median of 3.1. The calculated iron load was 50 pounds per day. Data collecetd near the mouth of Big Four Hollow Creek (station 03201700) from 1971 through 1979 (before dike construction) show the daily pH ranged from 2.1 to 6.7; the median was 3.6. The daily specific conduction ranged from 72 to 3,500 microsiements per centimeter at 25? Celsius and averaged 770. The estimated loads of chemical constituents were: Sulfate, 1,100 pounds per day: iron, 54 pounds per day: and manganese, 12 pounds per day. All postconstruction data collected at station 03201700 through the end of the project, May 1980 through June 30, 1983, show that the daily pH ranged from 2.4 to 7.7, with a median of 3.7. Daily specific conductance ranged from 87 to 3,200 microsiemens per centimeter and averaged 1,200. The estimated loads of chemical constituents for this period were: Sulfate, 1,000 pounds per day: iron, 44 pounds per day: and manganese, 16 pounds per day. Standard nonparametric statistical tests were performed on the data collected before and after reclamation. Differences at the 95-percent confidence level were found in the before- and after-reclamation data sets for specific conductance, aluminum, and manganese at station 03201700. Data collected during the first 6 months after reclamation indicated moderate improvement in water quality only because no highly mineralized water was leaking from the closed mine. Later, perhaps in Sepember 1980 increased hydraulic head behind the clay dike caused the mine water to seep out and degrade the stream-water quality. In order to investigate leakages, dye was injected into two wells that penetrated the closed mine complex 88. One injection revealed that the dye moved to a discharge point at a nearby mine entrance known to be connected to complex 88. No discharge of dye was detected as a result of dye injection into the other well during the project. Acidic mine water continues to seep from the closed mine complex 88. A definitive evaluation of the effects of reclamation on the area's water quality cannot be made until the hydrologic system stabilizes.

  15. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  16. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  17. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  18. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  19. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  20. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  1. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  2. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  3. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  4. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  5. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  6. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  7. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  8. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  10. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  11. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  12. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  13. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  14. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  15. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  16. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  17. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  18. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  19. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  20. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  1. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  2. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  3. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  4. 30 CFR 938.25 - Approval of Pennsylvania abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Pennsylvania abandoned mine land reclamation plan amendments. 938.25 Section 938.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE PENNSYLVANIA § 938.25 Approval of Pennsylvania abandoned mine land reclamation plan amendments...

  5. 43 CFR 404.45 - What will be included in the appraisal report prepared by Reclamation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What will be included in the appraisal report prepared by Reclamation? 404.45 Section 404.45 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  6. 43 CFR 404.21 - What is Reclamation's role in preparing the full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is Reclamation's role in preparing the full proposal? 404.21 Section 404.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404...

  7. 43 CFR 404.22 - How will Reclamation evaluate my full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation evaluate my full proposal? 404.22 Section 404.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.22 How will...

  8. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and identify opportunities to ensure safe and adequate rural water supplies for domestic, municipal... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the...

  9. 77 FR 11155 - Notice of Intent To Prepare an Environmental Impact Statement on the Pojoaque Basin Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent To Prepare an Environmental... Reclamation, Interior. ACTION: Notice of intent. SUMMARY: The Bureau of Reclamation (Reclamation) intends to... plan, design, and construct the Pojoaque Basin Regional Water System in accordance with the Settlement...

  10. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  11. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  12. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  13. 30 CFR 906.25 - Approval of Colorado abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan amendments. 906.25 Section 906.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE COLORADO § 906.25 Approval of Colorado abandoned mine land reclamation plan amendments. The...

  14. Succession of Bacterial Community Structure and Diversity in Soil along a Chronosequence of Reclamation and Re-Vegetation on Coal Mine Spoils in China

    PubMed Central

    Li, Yuanyuan; Wen, Hongyu; Chen, Longqian; Yin, Tingting

    2014-01-01

    The growing concern about the effectiveness of reclamation strategies has motivated the evaluation of soil properties following reclamation. Recovery of belowground microbial community is important for reclamation success, however, the response of soil bacterial communities to reclamation has not been well understood. In this study, PCR-based 454 pyrosequencing was applied to compare bacterial communities in undisturbed soils with those in reclaimed soils using chronosequences ranging in time following reclamation from 1 to 20 year. Bacteria from the Proteobacteria, Chloroflexi, Actinobacteria, Acidobacteria, Planctomycetes and Bacteroidetes were abundant in all soils, while the composition of predominant phyla differed greatly across all sites. Long-term reclamation strongly affected microbial community structure and diversity. Initial effects of reclamation resulted in significant declines in bacterial diversity indices in younger reclaimed sites (1, 8-year-old) compared to the undisturbed site. However, bacterial diversity indices tended to be higher in older reclaimed sites (15, 20-year-old) as recovery time increased, and were more similar to predisturbance levels nearly 20 years after reclamation. Bacterial communities are highly responsive to soil physicochemical properties (pH, soil organic matter, Total N and P), in terms of both their diversity and community composition. Our results suggest that the response of soil microorganisms to reclamation is likely governed by soil characteristics and, indirectly, by the effects of vegetation restoration. Mixture sowing of gramineae and leguminosae herbage largely promoted soil geochemical conditions and bacterial diversity that recovered to those of undisturbed soil, representing an adequate solution for soil remediation and sustainable utilization for agriculture. These results confirm the positive impacts of reclamation and vegetation restoration on soil microbial diversity and suggest that the most important phase of microbial community recovery occurs between 15 and 20 years after reclamation. PMID:25502754

  15. Addressing Open Water Data Challenges in the Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Danner, A.; Nagode, J.; Rocha, J.; Poulton, S.; Anderson, A.

    2017-12-01

    The Bureau of Reclamation is largest wholesaler of water in the United States. Located in the 17 western states, Reclamation serves water to 31 million people, provides irrigated water to 20 percent of Western farmers, and is the second largest producer of hydroelectric power in the United States. Through these activities, Reclamation generates large amounts of water and water-related data, describing reservoirs and river system conditions, hydropower, environmental compliance activities, infrastructure assets, and other aspects of Reclamation's mission activities. Reclamation aims to make water and water-related data sets more easily found, accessed, and used in decision-making activities in order to benefit the public, private sector, and research communities. Historically, there has not been an integrated, bureau-wide system to store data in machine-readable formats; nor a system to permit centralized browsing, open access, and web-services. Reclamation began addressing these limitations by developing the Reclamation Water Information System (RWIS), released in Spring 2017 (https://water.usbr.gov/). A bureau-wide team contributed to RWIS development, including water data stewards, database administrators, and information technology (IT) specialists. The first RWIS release publishes reservoir time series data from Reclamation's five regions and includes a map interface for sites identification, a query interface for data discovery and access, and web-services for automated retrieval. As RWIS enhancement continues, the development team is developing a companion system - the Reclamation Information Sharing Environment (RISE) - to provide access to the other data subjects and types (geospatial, documents). While RWIS and RISE are promising starts, Reclamation continues to face challenges in addressing open water data goals: making data consolidation and open publishing a value-added activity for programs that publish data locally, going beyond providing open access to also providing decision-support, and scaling up IT solutions for future success - where Reclamation programs increasingly elect to more and more data through RWIS/RISE, thereby creating a big data challenge. This presentation will highlight activities status, lessons learned, and future directions.

  16. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  17. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation can...

  18. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation can...

  19. 43 CFR 404.14 - How will Reclamation provide notice of opportunities for assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation provide notice of opportunities for assistance under the program? 404.14 Section 404.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  20. 43 CFR 404.37 - How will Reclamation determine the appropriate non-Federal share of construction costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation determine the appropriate non-Federal share of construction costs? 404.37 Section 404.37 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  1. Mine reclamation in Arkansas

    Treesearch

    Floyd Durham; James G. Barnum

    1980-01-01

    Open cut mine land reclamation laws have only been effective since 1971 in Arkansas. Since that time all land affected by mining had to be reclaimed. To guarantee reclamation, the first law required a $500 per acre surety bond be posted with the Arkansas Department of Pollution Control and Ecology. The Arkansas Open Cut Land Reclamation Act of 1977 changed the bonding...

  2. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  3. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  4. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  5. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  6. Current threats to the Lake Texcoco globally important bird area

    Treesearch

    Jose L. Alcantara; Patricia Escalante Pliego

    2005-01-01

    Lake Texcoco was reported as almost dry in the late 1960s, and as a consequence the aquatic life has been considered gone since then. However, the government undertook a reclamation/restoration project in the area beginning in 1971 to help alleviate some of the environmental problems of Mexico City. Although Lake Texcoco was not completely dry in that period, the basin...

  7. Visual Analysis as a design and decision-making tool in the development of a quarry

    Treesearch

    Randall Boyd Fitzgerald

    1979-01-01

    In order to obtain local and state government approvals, an environmental impact analysis of the mining and reclamation of a proposed hard rock quarry was required. High visibility of the proposed mining area from the adjacent community required a visual impact analysis in the planning and design of the project. The Visual Analysis defined design criteria for the...

  8. 78 FR 38736 - License Amendment Request for Homestake Mining Company of California, Grants Reclamation Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-27

    ... to approving the updated DRP, the NRC will need to make the findings required by the Atomic Energy... contention is within the scope of the proceeding and is material to the findings that the NRC must make to... to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited...

  9. 78 FR 79706 - Office of the Assistant Secretary-Water and Science; Draft Environmental Assessment of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ...The Department of the Interior (Department), the Utah Reclamation Mitigation and Conservation Commission (Mitigation Commission), and the Central Utah Water Conservancy District (CUWCD), as joint leads, are evaluating the impacts of a proposed increase in operation, maintenance and replacement activities associated with the Wasatch County Water Efficiency Project (WCWEP) and have prepared a Draft Environmental Assessment.

  10. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    NASA Astrophysics Data System (ADS)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-04-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  11. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    NASA Astrophysics Data System (ADS)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-06-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    K.E. Rasmuson

    The U.S. Department of Energy has implemented a program to reclaim lands disturbed by site characterization at Yucca Mountain. Long term goals of the program are to re-establish processes on disturbed sites that will lead to self-sustaining plant communities. The Biological Opinion for Yucca Mountain Site Characterization Studies required that the U.S. Department of Energy develop a Reclamation Standards and Monitoring Plan to evaluate the success of reclamation efforts. According to the Reclamation Standards and Monitoring Plan, reclaimed sites will be monitored periodically, remediated if necessary, and eventually compared to an appropriate reference area to determine whether reclamation goals havemore » been achieved and the site can be released from further monitoring. Plant cover, density, and species richness (success parameters) on reclaimed sites are compared to 60 percent of the values (success criteria) for the same parameters on the reference area. Small sites (less than 0.1 ha) are evaluated for release using qualitative methods while large sites (greater than 0.1 ha) are evaluated using quantitative methods. In the summer of 2000, 31 small sites reclaimed in 1993 and 1994 were evaluated for reclamation success and potential release from further monitoring. Plant density, cover, and species richness were estimated on the C-Well Pipeline, UE-25 Large Rocks test site, and 29 ground surface facility test pits. Evidence of erosion, reproduction and natural recruitment, exotic species abundance, and animal use (key attributes) also were recorded for each site and used in success evaluations. The C-Well Pipeline and ground surface facility test pits were located in a ''Larrea tridentata - Ephedra nevadensis'' vegetation association while the UE-25 Large Rocks test site was located in an area dominated by ''Coleogyne ramosissima and Ephedra nevadensis''. Reference areas in the same vegetation associations with similar slope and aspect were chosen for comparison to the reclaimed sites. Sixty percent of the reference area means for density, cover, and species richness were compared to the estimated means for the reclaimed sites. Plant density, cover, and species richness at the C-Well Pipeline and UE-25 Large Rocks test site were greater than the success criteria and all key attributes indicated the sites were in acceptable condition. Therefore, these two sites were recommended for release from further monitoring. Of the 29 ground surface facility test pits, 26 met the criterion for density, 21 for cover, and 23 for species richness. When key attributes and conditions of the plant community near each pit were taken into account, 27 of these pits were recommended for release. Success parameters and key attributes at ground surface facility test pits 19 and 20 were inadequate for site release. Transplants of native species were added to these two sites in 2001 to improve density, cover, and species richness.« less

  13. Earthworm responses to different reclamation processes in post opencast mining lands during succession.

    PubMed

    Hlava, Jakub; Hlavová, Anna; Hakl, Josef; Fér, Miroslav

    2015-01-01

    This study provides earthworm population data obtained from localities with a substantial anthropogenic impact spoils. The spoil heaps were reclaimed at the end of an opencast brown coal mining period. We studied spoils reclaimed by the two most commonly used reclamation processes: forestry and agricultural. The results show the significance of the locality age and the utilized reclamation process and treatment and their effect on earthworm communities. Our data indicate that apart from soil physical and chemical properties, the reclamation process itself may also induce viability and distribution of earthworm communities. Under standardized soil properties, the changes in earthworm populations during the succession were larger within the agricultural reclamation process as opposed to the forestry reclamation process for earthworm ecological groups and individual species.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sather, Nichole K.; Johnson, Gary E.; Storch, Adam

    The tidal freshwater monitoring (TFM) project reported herein is part of the research, monitoring, and evaluation effort developed by the Action Agencies (Bonneville Power Administration, the U.S. Army Corps of Engineers [USACE], and the U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act (ESA) as a result of operation of the Federal Columbia River Power System. The project is being performed under the auspices of the Northwest Power and Conservation Council’s Columbia Basin Fish and Wildlife Program (Project No. 2005-001-00). The research is a collaborative effort among the Pacific Northwest National Laboratory, the Oregon Departmentmore » of Fish and Wildlife, the National Marine Fisheries Service, and the University of Washington.« less

  15. Tapping Water from the Atmosphere: The Bureau of Reclamation's Project Skywater (Invited)

    NASA Astrophysics Data System (ADS)

    Harper, K.

    2010-12-01

    Since President Theodore Roosevelt signed the Reclamation Act on 17 June 1902—creating the forerunner of today’s Bureau of Reclamation that was established under Interior in 1907—this agency has been tasked with developing water resources in the US West. These efforts focused on building dams, reservoirs, and irrigation systems. But by the early 1960s, the federal government’s increasing interest in weather control began to attract the attention of BuRec’s leaders. Deciding that it was time to track down solid information on rainmaking techniques, the bureau called upon weather control pioneer Vincent Schaefer for assistance with its plan use weather modification as an adjunct to its water resources development portfolio. In response, Schaefer—writing to the National Science Foundation’s Earl Droessler in late 1961—declared that the Bureau’s proposed project would bring a “responsible, capable, and enthusiastic” group to represent the government and take over the engineering parts of weather modification. Enthusiastic was a bit of an understatement. BuRec was eager to use the atmosphere as a water reservoir, which could dispense moisture to watersheds feeding their earth-bound reservoirs. Contracting with universities—and working to get ahead of its nemesis, the skeptical US Weather Bureau—BuRec announced the artificial precipitation successes of its “Laboratory in the Sky” in early 1963. Although this headquarters-announced “success” was disputed by BuRec’s Denver field office, BuRec’s colorful commissioner Floyd Dominy was determined to press forward. Within months, the bureau was publishing reports indicating that the US West was a “potential future food deficit area” due to an increasing population that was outstripping the availability of ground and surface waters for agriculture. New approaches would be necessary to bring water to BuRec reservoirs for further distribution to municipalities, irrigators, and industries. The Atmospheric Water Resources Program could provide the answer by analyzing reclamation projects’ needs for additional water, the availability of related hydrologic and hydrometeorologic data, and the possibility of obtaining reasonably successful results by tapping into the knowledge and skills of its engineers, hydrometeorologists, and hydrologists. But as far as BuRec was concerned, this program—eventually dubbed Project Skywater—would do more than exploit the atmosphere as a water reservoir. It would provide the bureau with a vehicle to expand its portfolio to the entire nation. And as the eastern part of the nation experienced drought conditions in the mid-1960s, the opportunity was ripe for the picking. Therefore, the story of Skywater’s genesis provides an interesting case study in the intersection of water science, technology, and politics at the highest levels of federal government.

  16. Fifth symposium on surface mining and reclamation. NCA/BCR coal conference and Expo IV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1977-01-01

    The Fifth Symposium on Surface Mining and Reclamation, sponsored by the National Coal Association and Bituminous Coal Research, Inc., was held at the Kentucky Fair and Exposition Center, Louisville, Kentucky, October 18-20, 1977. Twenty-six papers from the proceedings have been entered individually into EDB and ERA. Topics covered include spoil bank revegetation, use of aerial photography, reclamation for row crop production, hydrology, computer programs related to this work, subirrigated alluvial valley floors, reclamation on steep slopes, mountain top removal, surface mine road design, successional processes involved in reclamation, land use planning, etc. (LTN)

  17. Reclamation by tubewell drainage in Rechna Doab and adjacent areas, Punjab region, Pakistan

    USGS Publications Warehouse

    Malmberg, Glenn T.

    1975-01-01

    Around the turn of the century, a network of more than 40,000 miles of canals was constructed to divert water from the Indus River and its tributaries to about 23 million acres of largely unused desert in the Punjab region of Pakistan. The favorable climate and the perennial supply of irrigation water made available through the canals instituted the beginning of intensive farming. However, because of generally poor drainage and the high rate of canal leakage, the water table began to rise. As the population increased and agriculture expanded, the demand for irrigation water soon exceeded the available supply. Spreading of the canal supply to meet the expanded needs locally created shortages that prevented adequate leaching. Increased evaporation from the rising water table further contributed to the progressive accumulation of soluble salts in the soil. By the late 1930's the combined effect of waterlogging and salinity had reduced the agricultural productivity of the region to one of the lowest in the world. In 1954, after several unsuccessful projects were undertaken to reclaim affected areas and to stop the progressive encroachment of waterlogging and salinization, the Government of Pakistan in cooperation with the U.S. International Cooperation Administration undertook a study of the geology and hydrology of the Indus Plain that ultimately resulted in the formulation of a ground-water reclamation program. The principal feature of the program is the utilization of a network of deep wells spaced about a mile apart for the dual purpose of lowering the water table and for providing supplemental irrigation water. Through financial assistance and technical and engineering support principally from the United States, construction began in 1960 on the first of 18 proposed reclamation projects that eventually will include 21 million acres and more than 28,000 wells having an installed capacity of more than 100,000 cubic feet per second. An area of about 1.3 million acres a few miles west of the City of Lahore was selected for the pilot project. The first Salinity Control and Reclamation Project (SCARP-l) was completed in 1962. Within the project area about 2,000 wells were drilled as deep as 350 feet and equipped with turbine pumps having a capacity of up to 5 cubic feet per second each and a combined operating capacity of about 3.5 million acre-feet per year. To July 1968 pumping from project wells and from private and other governmental agency wells supplied about 12 million acre-feet of water. This pumping more than doubled the available irrigation supply and lowered the water table to a depth of 10 feet or more below most of the project area. As a result, approximately 66 percent of the 400,000 acres of land damaged by waterlogging and accumulation of excessive salt was wholly or partially reclaimed. The cropping intensity was increased from about 77 percent in 1962 to 101 percent in July 1968, and the annual value of crops increased 186 percent over 1962. Annual water budgets for the first 6 years of project operation indicate that pumping caused a decrease in annual ground-water outflow from the project area from about 57,000 acre-feet to 32,000 acre-feet, caused an increase in annual ground-water inflow to the project area from 35,0'00 acre-feet to 52,000 acre-feet, and depleted about 1.71 million acre-.feet of groundwater storage. Net annual recharge to the ground-water reservoir during this same period ranged from a high of slightly more than 2 million acre-feet in 1964 to a low of about 1 million acre-feet in 1965. The budgets suggest that perhaps as much as half the net canal' inflow to the project area is lost through leakage. This leakage is the principal source of recharge to the ground-water reservoir. Pumping has caused widespread changes in the chemical quality of ground water by chanelling the rate and direction of flow, inducing infiltration from canals, and mixing of indigenous waters of dif

  18. Drivers, trends, and potential impacts of long-term coastal reclamation in China from 1985 to 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tian, Bo; Wu, Wenting; Yang, Zhaoqing

    Driven by rapid economic development, population growth, and urbanization, China has experienced severe coastal land reclamation over the last decades, which resulted in significant loss of coastal wetland and wildlife habitat, and degradation of marine ecosystems. This study used advanced remote-sensing techniques to analyze the spatial and temporal distributions of coastal reclamation in China and investigated the relationships between coastal land reclamation and coastal economy, population growth, and urbanization. Analysis of long-term Landsat images time series from 1985 to 2010 in 5-year intervals, in combination with remotely sensed image techniques, indicated a sharp increasing trend of land reclamation after 2005,more » which accounted for over 35% of China’s total reclamation during the 25-year period since 1985. High-intensity coastal reclamation in China was mainly driven by the booming economy associated with urbanization and industrial development in the coastal region. Analysis indicated that coastal land reclamation is closely correlated with the GDP per capita in China. Study results of Landsat images showed that 754,697 ha of coastal wetlands have been reclaimed across all coastal provinces and metropolises from 1985 to 2010, at an annual rate of 5.9%. Coastal areas within the three major economic zones (Bohai Bay, Yangtze River Delta, and Pearl River Delta) were found to generally have higher reclamation rates. For example, the built-up area in Shanghai, which is located in the Yangtze River Delta, increased more than five times from 1985 to 2010. Approximately 35% of the reclamation occurred in Bohai Bay, in which the CRI between 2005 and 2010 was three times higher than the average CRI over the 25-year period.« less

  19. 43 CFR 429.12 - Where do I file my application?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reclamation office having jurisdiction over the land, facility, or waterbody associated with your request. Reclamation office locations may be found on http://www.usbr.gov, the official Reclamation Internet Web site. ...

  20. 43 CFR 429.12 - Where do I file my application?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Reclamation office having jurisdiction over the land, facility, or waterbody associated with your request. Reclamation office locations may be found on http://www.usbr.gov, the official Reclamation Internet Web site. ...

  1. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  2. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  3. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  4. Mine Land Reclamation and Eco-Reconstruction in Shanxi Province I: Mine Land Reclamation Model

    PubMed Central

    Bing-yuan, Hao; Li-xun, Kang

    2014-01-01

    Coal resource is the main primary energy in our country, while Shanxi Province is the most important province in resource. Therefore Shanxi is an energy base for our country and has a great significance in energy strategy. However because of the heavy development of the coal resource, the ecological environment is worsening and the farmland is reducing continuously in Shanxi Province. How to resolve the contradiction between coal resource exploitation and environmental protection has become the imperative. Thus the concept of “green mining industry” is arousing more and more attention. In this assay, we will talk about the basic mode of land reclamation in mine area, the engineering study of mine land reclamation, the comprehensive model study of mine land reclamation, and the design and model of ecological agricultural reclamation in mining subsidence. PMID:25050398

  5. Basin wildrye (Leymus cinereus) pooled tetraploid accessions for U.S. Intermountain rangeland reclamation

    Treesearch

    Stanford A. Young; Jason Vernon; Nancy Shaw

    2013-01-01

    Basin wildrye (Leymus cinereus [Scribn. & Merr.] A. Love) is an important perennial, hardy, long-lived, cool season C3 native grass of rangeland plant communities throughout much of western United States and Canada. All classes of livestock and wildlife, including large and small birds and mammals, utilise the grass year round for food and protection due to its 2-3...

  6. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.25 How can I request Reclamation to... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How can I request Reclamation to review an... prioritization criteria in § 404.13. (c) You may make your submittal at any time and are not required to submit a...

  7. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.25 How can I request Reclamation to... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How can I request Reclamation to review an... prioritization criteria in § 404.13. (c) You may make your submittal at any time and are not required to submit a...

  8. A bill to amend the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior to participate in the city of Hermiston, Oregon, water recycling and reuse project, and for other purposes.

    THOMAS, 111th Congress

    Sen. Wyden, Ron [D-OR

    2009-08-04

    Senate - 04/27/2010 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 111-619. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  9. A bill to amend the Reclamation Wastewater and Groundwater Study and Facilities Act to authorize the Secretary of the Interior to participate in the City of Hermiston, Oregon, water recycling and reuse project, and for other purposes.

    THOMAS, 112th Congress

    Sen. Wyden, Ron [D-OR

    2011-05-19

    Senate - 06/23/2011 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 112-129. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  10. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Actmore » of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.« less

  11. Soil physical properties: Key factors for successful reclamation of disturbed landscapes

    NASA Astrophysics Data System (ADS)

    Krümmelbein, Julia; Raab, Thomas

    2013-04-01

    The practice of open cast mining, e.g. for lignite, results in major landscape disturbances and especially affects soils because relocation and subsequent mixing of naturally developed soil horizons leads to areas with extremely altered soil properties compared to the undisturbed conditions. Various reclamation measures are applied to recover the reconstructed landscape for different land use options. Major parts of the post mining landscapes are used for agriculture, agroforestry or silviculture, the remaining voids of the coal mines fill successively with groundwater after mine closure and are or will be used mainly for touristic and leisure purposes. Small proportions of the post mining areas are left for natural succession, or habitats for endangered flora and fauna are initiated. In reclamation research, many studies have focused on soil chemical and biological constraints of post mining substrates and investigated factors such as unsuitable pH, in many cases very low pH, (poor) nutrient contents and (poor) biological activity. But the initial and developing soil physical parameters and functions are also key factors for the success of reclamation practices. The soil water and gas balance influence strongly the suitability of a site for the intended future land use. The mechanical stability of the soil determines the rigidity of the pore system against deforming forces and thereby the persistence of soil functions, such as water and air permeability over time. The amendment of unfavourable (initial) soil physical properties is in most cases more complex and time-consuming than e.g. optimization of pH or fertilization with nutrients. Moreover, regarding the suitability of a site e.g. as a habitat for plants or microorganisms, poor physical pre-conditions can turn substrates with perfect nutrient contents and composition and pH into infertile locations of very low productivity. We show results of an on-going field study where the effects of different agricultural reclamation measures on initial soil physical properties and their development are investigated. Site reconstruction creates the preconditions for the soil physical development, which depends on the subsequent soil disturbance, e.g. due to tillage and on the vegetation/crop rotation. We recommend that the process of site reconstruction should be accomplished with highest possible accuracy and pre-caution. Suitable vegetation, e.g. deep and intense rooting crops should be established and the mechanically unstable sites should be protected from heavy loads and intensive soil tillage operations to facilitate the development of soil structure in the course of reclamation.

  12. Geochemical investigations and interim recommendations for priority abandoned mine sites on U.S.D.A. Forest Service lands, Mineral Creek watershed, San Juan County, Colorado

    USGS Publications Warehouse

    Nash, J.T.

    1999-01-01

    Field observations, sampling of mine dumps and mine drainage waters, and laboratory studies of dump materials have been made at mining areas deemed to be on public lands administered by the USDA Forest Service in the Mineral Creek watershed. Results of chemical analyses of dump materials, leachates of those materials, and of surface waters draining mines or dumps provide indications of where acid is generated or consumed, and what metals are mobilized below mines or dumps. Information on 25 sites is reviewed and reclamation priorities are ranked into four classes (high, medium, low priority, or no work required). The western side of the upper Animas watershed (the Mineral Creek watershed) has a history of mining and prospecting for about 130 years. The intensity of miningrelated disturbance is higher than in most parts of the San Juan Mountains region, but actually is much less than the eastern half of the watershed (US BLM lands) and none of the mines moved millions of tons of rock and ore as in some of the eastern mines. The majority of the roughly one thousand mining sites on the USFS lands are very small (less than 100 tons or 70 cubic yards of dump material), are more than 2 miles from a major stream, or are so inaccessible as to prohibit reclamation. Twenty five sites have been considered by others to have significant size and potential for significant environmental degradation. These most significant mining areas were evaluated by multiple criteria, including tendency to generate acid or liberate toxic metals, observed acidic pH or dead vegetation (?kill zones?) below dumps or adits, potential mobility of metals, and likelihood of transport into streams of the watershed. In the author?s opinion, no single measurable parameter, such as metal concentration, is reliable for ranking significance or feasibility of reclamation. Rather, subjective estimates are required to evaluate combinations of, or interactions among, several parameters. The most subjective estimate in ranking feasibility of reclamation is the amount of natural and mine-related contamination at each mining area. Mitigation of natural contributions at mines or unmined areas is beyond the scope of these Abandoned Mine Lands (AML) investigations, but must be considered when planning reclamation. Available information for the 25 problem sites is adequate for ranking, but at some sites additional information on groundwater conditions is needed for a more reliable ranking and evaluation of reclamation methods.

  13. 30 CFR 784.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.1 Scope. This part... mining operations and reclamation plans portions of applications for permits for underground mining...

  14. Developing standards and specifications for full depth pavement reclamation.

    DOT National Transportation Integrated Search

    2012-05-25

    The report summarizes the work conducted during the development of procedures for conducting full depth reclamation of existing asphalt surfaced and unsurfaced roads. The report describes full depth reclamation, and includes a summary of available li...

  15. The Impact of Climate Projection Method on the Analysis of Climate Change in Semi-arid Basins

    NASA Astrophysics Data System (ADS)

    Halper, E.; Shamir, E.

    2016-12-01

    In small basins with arid climates, rainfall characteristics are highly variable and stream flow is tightly coupled with the nuances of rainfall events (e.g. hourly precipitation patterns Climate change assessments in these basins typically employ CMIP5 projections downscaled with Bias Corrected Statistical Downscaling and Bias Correction/Constructed Analogs (BCSD-BCCA) methods, but these products have drawbacks. Specifically, BCSD-BCCA these projections do not explicitly account for localized physical precipitation mechanisms (e.g. monsoon and snowfall) that are essential to many hydrological systems in the U. S. Southwest. An investigation of the impact of different types of precipitation projections for two kinds of hydrologic studies is being conducted under the U.S. Bureau of Reclamation's Science and Technology Grant Program. An innovative modeling framework consisting of a weather generator of likely hourly precipitation scenarios, coupled with rainfall-runoff, river routing and groundwater models, has been developed in the Nogales, Arizona area. This framework can simulate the impact of future climate on municipal water operations. This framework allows the rigorous comparison of the BCSD-BCCA methods with alternative approaches including rainfall output from dynamical downscaled Regional Climate Models (RCM), a stochastic rainfall generator forced by either Global Climate Models (GCM) or RCM, and projections using historical records conditioned on either GCM or RCM. The results will provide guide for the use of climate change projections into hydrologic studies of semi-arid areas. The project extends this comparison to analyses of flood control. Large flows on the Bill Williams River are a concern for the operation of dams along the Lower Colorado River. After adapting the weather generator for this region, we will evaluate the model performance for rainfall and stream flow, with emphasis on statistical features important to the specific needs of flood management. The end product of the research is to develop a test to guide selection of a precipitation projection method (including downscaling procedure) for a given region and objective.

  16. States at Risk: America's Preparedness Report Card

    NASA Astrophysics Data System (ADS)

    Yu, R. M. S.; Strauss, B.; Kulp, S. A.; Bronzan, J.; Rodehorst, B.; Bhat, C.; Dix, B.; Savonis, M.; Wiles, R.

    2015-12-01

    Many states are already experiencing the costly impacts of extreme climate and weather events. The occurrence, frequency and intensity of these events may change under future climates. Preparing for these changes takes time, and state government agencies and communities need to recognize the risks they could potentially face and the response actions already undertaken. The States at Risk: America's Preparedness Report Card project is the first-ever study that quantifies five climate-change-driven hazards, and the relevant state government response actions in each of the 50 states. The changing characteristics of extreme heat, drought, wildfires, inland and coastal flooding were assessed for the baseline period (around year 2000) through the years 2030 and 2050 across all 50 states. Bias-corrected statistically-downscaled (BCSD) climate projections (Reclamation, 2013) and hydrology projections (Reclamation, 2014) from the Coupled Model Intercomparison Project phase 5 (CMIP5) under RCP8.5 were used. The climate change response action analysis covers five critical sectors: Transportation, Energy, Water, Human Health and Communities. It examined whether there is evidence that the state is taking action to (1) reduce current risks, (2) raise its awareness of future risks, (3) plan for adaptation to the future risks, and (4) implement specific actions to reduce future risks for each applicable hazards. Results from the two analyses were aggregated and translated into a rating system that standardizes assessments across states, which can be easily understood by both technical and non-technical audiences. The findings in this study not only serve as a screening tool for states to recognize the hazards they could potentially face as climate changes, but also serve as a roadmap for states to address the gaps in response actions, and to improve climate preparedness and resilience.

  17. Using NASA Earth Observing Satellites and Statistical Model Analysis to Monitor Vegetation and Habitat Rehabilitation in Southwest Virginia's Reclaimed Mine Lands

    NASA Astrophysics Data System (ADS)

    Tate, Z.; Dusenge, D.; Elliot, T. S.; Hafashimana, P.; Medley, S.; Porter, R. P.; Rajappan, R.; Rodriguez, P.; Spangler, J.; Swaminathan, R. S.; VanGundy, R. D.

    2014-12-01

    The majority of the population in southwest Virginia depends economically on coal mining. In 2011, coal mining generated $2,000,000 in tax revenue to Wise County alone. However, surface mining completely removes land cover and leaves the land exposed to erosion. The destruction of the forest cover directly impacts local species, as some are displaced and others perish in the mining process. Even though surface mining has a negative impact on the environment, land reclamation efforts are in place to either restore mined areas to their natural vegetated state or to transform these areas for economic purposes. This project aimed to monitor the progress of land reclamation and the effect on the return of local species. By incorporating NASA Earth observations, such as Landsat 8 Operational Land Imager (OLI) and Landsat 5 Thematic Mapper (TM), re-vegetation process in reclamation sites was estimated through a Time series analysis using the Normalized Difference Vegetation Index (NDVI). A continuous source of cloud free images was accomplished by utilizing the Spatial and Temporal Adaptive Reflectance Fusion Model (STAR-FM). This model developed synthetic Landsat imagery by integrating the high-frequency temporal information from Terra/Aqua Moderate Resolution Imaging Spectroradiometer (MODIS) and high-resolution spatial information from Landsat sensors In addition, the Maximum Entropy Modeling (MaxENT), an eco-niche model was used to estimate the adaptation of animal species to the newly formed habitats. By combining factors such as land type, precipitation from Tropical Rainfall Measuring Mission (TRMM), and slope from Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER), the MaxENT model produced a statistical analysis on the probability of species habitat. Altogether, the project compiled the ecological information which can be used to identify suitable habitats for local species in reclaimed mined areas.

  18. 30 CFR 701.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... program implementation; (2) Subchapter D on surface coal mining and reclamation operations on Federal lands; (3) Subchapter E on surface coal mining and reclamation operations on Indian lands. (4...

  19. 30 CFR 780.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.10... activities, including a requirement that the application include an operation and reclamation plan. The...

  20. 30 CFR 701.4 - Responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... responsibility for regulation of coal exploration and surface coal mining and reclamation operations during the... mining and reclamation operations, approval of coal exploration which substantially disturbs the natural...

Top