Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey
DOE Office of Scientific and Technical Information (OSTI.GOV)
None,
1980-05-01
The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regardingmore » hydroelectric power development are discussed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turbak, Susan C.; Reichle, Donna R.; Shriner, Carole R.
1981-01-01
The purpose of this report is to provide summary information for use by potential developers and regulators of small-scale hydroelectric projects (defined as existing dams that can be retrofitted to a total site capacity of ≤30 MW), where turbine-related mortality of fish is a potential issue affecting site-specific development. Mitigation techniques for turbine-related mortality are not covered in this report.
Rivers of Energy: The Hydropower Potential. Worldwatch Paper No. 44.
ERIC Educational Resources Information Center
Deudney, Daniel
Described are the history, current status and future potential of hydroelectric power in the world. Issues discussed include the environmental and social impacts of dam construction, and the use of small-scale hydroelectric installations in developing nations. Also considered are hydroelectric development of the world's remote regions, the need to…
Philippines: Small-scale renewable energy update
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-12-01
This paper gives an overview of the application of small scale renewable energy sources in the Philippines. Sources looked at include solar, biomass, micro-hydroelectric, mini-hydroelectric, wind, mini-geothermal, and hybrid. A small power utilities group is being spun off the major utility, to provide a structure for developing rural electrification programs. In some instances, private companies have stepped forward, avoiding what is perceived as overwhelming beaurocracy, and installed systems with private financing. The paper provides information on survey work which has been done on resources, and the status of cooperative programs to develop renewable systems in the nation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-05-01
The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysismore » and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)« less
Small-Scale Hydroelectric Power in the Southwest: New Impetus for an old Energy Source
NASA Astrophysics Data System (ADS)
1980-06-01
A forum was provided for state legislators and other interested persons to discuss the problems facing small scale hydro developers, and to recommend appropriate solutions to resolve those problems. Alternative policy options were recommended for consideration by both state and federal agencies. Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small scale hydro projects. Legislative resolution of the problems and delays in small scale hydro licensing and development were also stressed.
Code of Federal Regulations, 2012 CFR
2012-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
Code of Federal Regulations, 2013 CFR
2013-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
Code of Federal Regulations, 2014 CFR
2014-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turbak, S. C.; Reichle, D. R.; Shriner, C. R.
1981-01-01
This document presents a state-of-the-art review of literature concerning turbine-related fish mortality. The review discusses conventional and, to a lesser degree, pumped-storage (reversible) hydroelectric facilities. Much of the research on conventional facilities discussed in this report deals with studies performed in the Pacific Northwest and covers both prototype and model studies. Research conducted on Kaplan and Francis turbines during the 1950s and 1960s has been extensively reviewed and is discussed. Very little work on turbine-related fish mortality has been undertaken with newer turbine designs developed for more modern small-scale hydropower facilities; however, one study on a bulb unit (Kaplan runner)more » has recently been released. In discussing turbine-related fish mortality at pumped-storage facilities, much of the literature relates to the Ludington Pumped Storage Power Plant. As such, it is used as the principal facility in discussing research concerning pumped storage.« less
State Models to Incentivize and Streamline Small Hydropower Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtis, Taylor; Levine, Aaron; Johnson, Kurt
In 2016, the hydropower fleet in the United States produced more than 6 percent (approximately 265,829 gigawatt-hours [GWh]) of the total net electricity generation. The median-size hydroelectric facility in the United States is 1.6 MW and 75 percent of total facilities have a nameplate capacity of 10 MW or less. Moreover, the U.S. Department of Energy's Hydropower Vision study identified approximately 79 GW hydroelectric potential beyond what is already developed. Much of the potential identified is at low-impact new stream-reaches, existing conduits, and non-powered dams with a median project size of 10 MW or less. To optimize the potential andmore » value of small hydropower development, state governments are crafting policies that provide financial assistance and expedite state and federal review processes for small hydroelectric projects. This report analyzes state-led initiatives and programs that incentivize and streamline small hydroelectric development.« less
National Hydroelectric Power Resources Study: Environmental Assessment. Volume 8
1981-09-01
hydropower developers were initiated as a result of the Public Utility Regulatory Policies Act ( PURPA ) and the Energy Security Act. Those acts and...1980a). With the passage of The Public Utilities Regulatory Policy Act ( PURPA ), DOE was authorized to promote small-scale hydropower. Under its Small...requested. In addition, OMB has decided not to request the $300 million construction loan appropriation authorized under the PURPA because OMB
Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia
NASA Astrophysics Data System (ADS)
Turan, Faiz Mohd; Johan, Kartina
2017-08-01
Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.
Code of Federal Regulations, 2013 CFR
2013-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
Code of Federal Regulations, 2014 CFR
2014-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
Code of Federal Regulations, 2012 CFR
2012-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
[Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].
Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping
2011-05-01
Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... certification, pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities...
Assessment of energy options for Liberia. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-11-01
Under funding from the U.S. Agency for International Development (USAID), the Oak Ridge National Laboratory provided energy planning assistance to the National Energy Committee of the Government of Liberia (GOL), West Africa, during a period of one year ending March 31, 1983. This report outlines the scope of activities of the joint GOL/USAID project and summarizes the major findings by Liberian and U.S. project participants. The study included and examination of current energy use by sector and fuel type, projections of future energy demands, and a preliminary evaluation of a variety of alternative energy resource and technology options for Liberia.more » The primary finding is that Liberia has significant opportunities for the substitution of indigenous energy resources for imported petroleum. The principal candidates are wood energy and hydroelectric power. The major alternatives for wood are gasification technology for small-scale electric and nonelectric applications (e.g., those under about 25-gigajoule/hour input requirements) and wood-fired steam electric generation for larger scale applications where hydroelectric power is unattractive. For major hydroelectric development the principal candidates are the St. Paul River Proposal and the Mano River Proposal. The Mano River Proposal is the smaller of the two and would meet Monrovia area electrical grid requirements and some iron ore mine demand for about the next two decades. An additional important finding of this study is that the Monrovia Petroleum refinery is highly uneconomical and should be closed and petroleum product imported directly. 25 tables.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...
Small mammal responses to Amazonian forest islands are modulated by their forest dependence.
Palmeirim, Ana Filipa; Benchimol, Maíra; Vieira, Marcus Vinícius; Peres, Carlos A
2018-05-01
Hydroelectric dams have induced widespread loss, fragmentation and degradation of terrestrial habitats in lowland tropical forests. Yet their ecological impacts have been widely neglected, particularly in developing countries, which are currently earmarked for exponential hydropower development. Here we assess small mammal assemblage responses to Amazonian forest habitat insularization induced by the 28-year-old Balbina Hydroelectric Dam. We sampled small mammals on 25 forest islands (0.83-1466 ha) and four continuous forest sites in the mainland to assess the overall community structure and species-specific responses to forest insularization. We classified all species according to their degree of forest-dependency using a multi-scale approach, considering landscape, patch and local habitat characteristics. Based on 65,520 trap-nights, we recorded 884 individuals of at least 22 small mammal species. Species richness was best predicted by island area and isolation, with small islands (< 15 ha) harbouring an impoverished nested subset of species (mean ± SD: 2.6 ± 1.3 species), whereas large islands (> 200 ha; 10.8 ± 1.3 species) and continuous forest sites (∞ ha; 12.5 ± 2.5 species) exhibited similarly high species richness. Forest-dependent species showed higher local extinction rates and were often either absent or persisted at low abundances on small islands, where non-forest-dependent species became hyper-abundant. Species capacity to use non-forest habitat matrices appears to dictate small mammal success in small isolated islands. We suggest that ecosystem functioning may be highly disrupted on small islands, which account for 62.7% of all 3546 islands in the Balbina Reservoir.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
18 CFR 4.105 - Action on exemption applications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...
18 CFR 4.105 - Action on exemption applications.
Code of Federal Regulations, 2013 CFR
2013-04-01
... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...
18 CFR 4.105 - Action on exemption applications.
Code of Federal Regulations, 2012 CFR
2012-04-01
... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...
Code of Federal Regulations, 2011 CFR
2011-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...
Red River of the North, Reconnaissance Report: Wild Rice River.
1980-12-01
2 lists the waste treatment facilities and needs of fifteen coumnities within the subbasin. Hydropower There are three dams located on the Wild Rice...potential hydroelectric sites. The dams were built primarily for flood control purposes and are classified as small-scale facilities. The main obstacles...drain a combined total area of 2,233 square miles. Several small low-water dams and a few larger impoundments have been constructed on the river and its
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false General requirements...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2012 CFR
2012-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2013 CFR
2013-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2011 CFR
2011-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2010 CFR
2010-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2014 CFR
2014-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.
Code of Federal Regulations, 2013 CFR
2013-04-01
... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.
Code of Federal Regulations, 2012 CFR
2012-04-01
... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.
Code of Federal Regulations, 2014 CFR
2014-04-01
... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
A critical view on the eco-friendliness of small hydroelectric installations.
Premalatha, M; Tabassum-Abbasi; Abbasi, Tasneem; Abbasi, S A
2014-05-15
Renewable energy sources are widely perceived as 'clean', 'green', and 'inexhaustible'. In recent years the spectre of global warming and ocean acidification, which has been primarily attributed to fossil fuel burning, has brought renewable energy at the forefront of most climate change mitigation strategies. There is strong advocacy for large-scale substitution of conventional energy sources with the renewables on the premise that such a move would substantially reduce environmental degradation and global warming. These sentiments are being echoed by scientists and policy makers as well as environmental activists all over the world. 'Small hydro', which generally represents hydroelectric power projects of capacities 25 MW or lower, is one of the renewable energy options which is believed to be clean and sustainable even as its bigger version, large hydro, is known to cause several strongly adverse environmental impacts. This paper brings out that the prevailing perception of 'eco-friendliness' of small hydro is mainly due to the fact that it has only been used to a very small extent so far. But once it is deployed at a scale comparable to fossil fuel use, the resulting impacts would be quite substantially adverse. The purpose is not to denegrade small hydro, less so to advocate use of fossil fuels. It, rather, is to bring home the point that a much more realistic and elaborate assessment of the likely direct as well as indirect impacts of extensive utilization of this energy source than has been done hitherto is necessary. Copyright © 2013 Elsevier B.V. All rights reserved.
Global analysis of a renewable micro hydro power generation plant
NASA Astrophysics Data System (ADS)
Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul
2017-12-01
Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.
Divestiture summary report: Sale of Eklutna and Snettisham hydroelectric projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
This report accompanies the legislative proposal to authorize sale of the two Alaskan Federal hydroelectric projects and close out the Alaska Power Administration (APA). The 78,210 kill Snettisham Project serving Juneau would be sold to the Alaska Energy Authority, a State corporation which owns six other hydroelectric projects. The 30,000 kill Eklutna Project serving the Anchorage and Matanuska Valley areas would be sold to the three electric utilities which now purchase power from that project. Terms and conditions for the sales are set out in negotiated Purchase Agreements. Key aspects include: (1) Development of Transition Plans within six months aftermore » Congress authorizes the divestiture. (2) Transaction Date to be set in the Transition Plans. (3) Description of assets to be transferred. (4) Price and payment terms. (5) Environmental Management Plans. (6) Protection of interests in several important non-power'' uses of project land and water. Under a separate agreement, the Purchasers assume responsibility for developing and implementing post-sale programs for protection, mitigation, and enhancement of fish and wildlife resources impacted by hydroelectric development in the Eldutna and Snettisham basins. The estimated sale proceeds to the United States Treasury are between $73.5 and $80.3 million, assuming the transactions are completed between October 1, 1992 and October 1, 1993. Eklutna and Snettisham are modest-sized, single-purpose hydroelectric projects involving small river basins entirely within Alaska. Locally, they are important long-term suppliers of economically-priced hydroelectric power. The sale terms and structure assure that the projects will continue to serve their intended purposes. Modest rate increases are expected over the short term, but long-term power rates are expected to be similar to those that would prevail under continued Federal ownership.« less
Divestiture summary report: Sale of Eklutna and Snettisham hydroelectric projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
This report accompanies the legislative proposal to authorize sale of the two Alaskan Federal hydroelectric projects and close out the Alaska Power Administration (APA). The 78,210 kill Snettisham Project serving Juneau would be sold to the Alaska Energy Authority, a State corporation which owns six other hydroelectric projects. The 30,000 kill Eklutna Project serving the Anchorage and Matanuska Valley areas would be sold to the three electric utilities which now purchase power from that project. Terms and conditions for the sales are set out in negotiated Purchase Agreements. Key aspects include: (1) Development of Transition Plans within six months aftermore » Congress authorizes the divestiture. (2) Transaction Date to be set in the Transition Plans. (3) Description of assets to be transferred. (4) Price and payment terms. (5) Environmental Management Plans. (6) Protection of interests in several important ``non-power`` uses of project land and water. Under a separate agreement, the Purchasers assume responsibility for developing and implementing post-sale programs for protection, mitigation, and enhancement of fish and wildlife resources impacted by hydroelectric development in the Eldutna and Snettisham basins. The estimated sale proceeds to the United States Treasury are between $73.5 and $80.3 million, assuming the transactions are completed between October 1, 1992 and October 1, 1993. Eklutna and Snettisham are modest-sized, single-purpose hydroelectric projects involving small river basins entirely within Alaska. Locally, they are important long-term suppliers of economically-priced hydroelectric power. The sale terms and structure assure that the projects will continue to serve their intended purposes. Modest rate increases are expected over the short term, but long-term power rates are expected to be similar to those that would prevail under continued Federal ownership.« less
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
Small-Scale Smart Grid Construction and Analysis
NASA Astrophysics Data System (ADS)
Surface, Nicholas James
The smart grid (SG) is a commonly used catch-phrase in the energy industry yet there is no universally accepted definition. The objectives and most useful concepts have been investigated extensively in economic, environmental and engineering research by applying statistical knowledge and established theories to develop simulations without constructing physical models. In this study, a small-scale version (SSSG) is constructed to physically represent these ideas so they can be evaluated. Results of construction show data acquisition three times more expensive than the grid itself although mainly due to the incapability to downsize 70% of data acquisition costs to small-scale. Experimentation on the fully assembled grid exposes the limitations of low cost modified sine wave power, significant enough to recommend pure sine wave investment in future SSSG iterations. Findings can be projected to full-size SG at a ratio of 1:10, based on the appliance representing average US household peak daily load. However this exposes disproportionalities in the SSSG compared with previous SG investigations and recommended changes for future iterations are established to remedy this issue. Also discussed are other ideas investigated in the literature and their suitability for SSSG incorporation. It is highly recommended to develop a user-friendly bidirectional charger to more accurately represent vehicle-to-grid (V2G) infrastructure. Smart homes, BEV swap stations and pumped hydroelectric storage can also be researched on future iterations of the SSSG.
Analysis of synchronous and induction generators used at hydroelectric power plant
NASA Astrophysics Data System (ADS)
Diniş, C. M.; Popa, G. N.; lagăr, A.
2017-01-01
In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.
Design optimization of a vaneless ``fish-friendly'' swirl injector for small water turbines
NASA Astrophysics Data System (ADS)
Airody, Ajith; Peterson, Sean D.
2015-11-01
Small-scale hydro-electric plants are attractive options for powering remote sites, as they draw energy from local bodies of water. However, the environmental impact on the aquatic life drawn into the water turbine is a concern. To mitigate adverse consequences on the local fauna, small-scale water turbine design efforts have focused on developing ``fish-friendly'' facilities. The components of these turbines tend to have wider passages between the blades when compared to traditional turbines, and the rotors are designed to spin at much lower angular velocities, thus allowing fish to pass through safely. Galt Green Energy has proposed a vaneless casing that provides the swirl component to the flow approaching the rotor, eliminating the need for inlet guide vanes. We numerically model the flow through the casing using ANSYS CFX to assess the evolution of the axial and circumferential velocity symmetry and uniformity in various cross-sections within and downstream of the injector. The velocity distributions, as well as the pressure loss through the injector, are functions of the pitch angle and number of revolutions of the casing. Optimization of the casing design is discussed via an objective function consisting of the velocity and pressure performance measures.
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
NASA Astrophysics Data System (ADS)
Kaplan, D. A.; Livino, A.; Arias, M. E.; Crouch, T. D.; Anderson, E.; Marques, E.; Dutka-Gianelli, J.
2017-12-01
The Amazon River watershed is the world's largest river basin and provides US$30 billion/yr in ecosystem services to local populations, national societies, and humanity at large. The Amazon is also a relatively untapped source of hydroelectricity for Latin America, and construction of >30 large hydroelectric dams and >170 small dams is currently underway. Hydropower development will have a cascade of physical, ecological, and social effects at local to global scales. While Brazil has well-defined environmental impact assessment and mitigation programs, these efforts often fail to integrate data and knowledge across disciplines, sectors, and societies throughout the dam planning process. Resulting failures of science, policy, and management have had widespread environmental, economic, and social consequences, highlighting the need for an improved theoretical and practical framework for understanding the impacts of Amazon dams and guiding improved management that respects the needs and knowledge of diverse set of stakeholders. We present a conceptual framework that links four central goals: 1) connecting research in different disciplines (interdisciplinarity); 2) incorporating new knowledge into decision making (adaptive management); 3) including perspectives and participation of non-academic participants in knowledge generation (transdisciplinarity); and 4) extending the idea of environmental flows ("how much water does a river need?") to better consider human uses and users through the concept of fluvial anthropology ("how much water does a society need?"). We use this framework to identify opportunities for improved integration strategies within the (Brazilian) hydroelectric power plant planning and implementation "lifecycle." We applied this approach to the contentious Belo Monte dam, where compliance with regulatory requirements, including monitoring for environmental flows, exemplifies the opportunity for applying adaptive management, but also highlights an urgent need for much improved communication with and participation of affected communities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, Robert L.; Simmons, Mary Ann; Simmons, Carver S.
2002-03-07
This book chapter describes a Dual-Head Multibeam Sonar (DHMS) system developed by Battelle and deployed at two dam sites on the Snake and Columbia rivers in Washington State to evaluate the fine-scale (
1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), ...
1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), SHOWING DAM AND POWERHOUSE IN FOREGROUND, VILLAGE COMPLEX IN RIGHT BACKGROUND, LOOKING WEST FROM ABOVE STATE HIGHWAY 291 - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
Village scale micro-hydroelectric systems in countries like Bhutan, Thailand, Peru, Laos and China provide renewable electricity to thousands of self-reliant communities in remote locations. While promising, many of these systems are plagued by a common problem: brownouts occu...
NASA Astrophysics Data System (ADS)
Alligné, S.; Maruzewski, P.; Dinh, T.; Wang, B.; Fedorov, A.; Iosfin, J.; Avellan, F.
2010-08-01
The growing development of renewable energies combined with the process of privatization, lead to a change of economical energy market strategies. Instantaneous pricings of electricity as a function of demand or predictions, induces profitable peak productions which are mainly covered by hydroelectric power plants. Therefore, operators harness more hydroelectric facilities at full load operating conditions. However, the Francis Turbine features an axi-symmetric rope leaving the runner which may act under certain conditions as an internal energy source leading to instability. Undesired power and pressure fluctuations are induced which may limit the maximum available power output. BC Hydro experiences such constraints in a hydroelectric power plant consisting of four 435 MW Francis Turbine generating units, which is located in Canada's province of British Columbia. Under specific full load operating conditions, one unit experiences power and pressure fluctuations at 0.46 Hz. The aim of the paper is to present a methodology allowing prediction of this prototype's instability frequency from investigations on the reduced scale model. A new hydro acoustic vortex rope model has been developed in SIMSEN software, taking into account the energy dissipation due to the thermodynamic exchange between the gas and the surrounding liquid. A combination of measurements, CFD simulations and computation of eigenmodes of the reduced scale model installed on test rig, allows the accurate calibration of the vortex rope model parameters at the model scale. Then, transposition of parameters to the prototype according to similitude laws is applied and stability analysis of the power plant is performed. The eigenfrequency of 0.39 Hz related to the first eigenmode of the power plant is determined to be unstable. Predicted frequency of the full load power and pressure fluctuations at the unit unstable operating point is found to be in general agreement with the prototype measurements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software are covered. This month`s Tech Notes include: (1) a study linking development and reservoir silting in El Salvador, (2) publication of a guide for small hydro operatos, and (3) publication of a text outlining the development of hydroelectric power in Russia.
Developing hydropower in Washington state. Volume 2: An electricity marketing manual
NASA Astrophysics Data System (ADS)
James, J. W.; McCoy, G. A.
1982-03-01
An electricity marketing manual for the potential small and micro-hydroelectric project developer within the state of Washington is presented. Public utility regulatory policies (PURPA) requires electric utilities to interconnect with and pay a rate based on their full avoided costs for the purchase of electrical output from qualifying small power production facilities. The determination of avoided costs, as business organizational considerations, utility interface concerns, interconnection requirements, metering options, and liability and wheeling are discussed. The utility responses are summarized, legislation which is of importance to hydropower developers and the powers and functions of the authorities responsible for enforcing the mandate of PURPA are described.
5. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. SMALL PELTONDOBLE IMPULSE ...
5. POWERHOUSE INTERIOR SHOWING EXCITER No. 1. SMALL PELTON-DOBLE IMPULSE WHEEL IN FOREGROUND. VIEW TO NORTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA
Electric plant cost and power production expenses 1989. [Glossary included
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-03-29
This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, federal, state, and local governments, and the general public. This report primarily presents aggregate operation, maintenance, and fuel expense data about all power plants owned and operated by the major investor-owned electric utilities in the United States. The power production expenses for the major investor-owned electric utilities are summarized. Plant-specific data are presented for a selection of both investor-owned and publicly owned plants. Summary statistics for each plantmore » type (prime mover), as reported by the electric utilities, are presented in the separate chapters as follows: Hydroelectric Plants; Fossil-Fueled Steam-Electric Plants; Nuclear Steam-Electric Plants; and Gas Turbine and Small Scale Electric Plants. These chapters contain plant level data for 50 conventional hydroelectric plants and 22 pumped storage hydroelectric plants, 50 fossil-fueled steam-electric plants, 71 nuclear steam-electric plants, and 50 gas turbine electric plants. Among the operating characteristics of each plant are the capacity, capability, generation and demand on the plant. Physical characteristics comprise the number of units in the plant, the average number of employees, and other information relative to the plant's operation. The Glossary section will enable the reader to understand clearly the terms used in this report. 4 figs., 18 tabs.« less
Equipment for fully homologous bulb turbine model testing in Laval University
NASA Astrophysics Data System (ADS)
R, Fraser; D, Vallée; Y, Jean; C, Deschênes
2014-03-01
Within the context of liberalisation of the energy market, hydroelectricity remains a first class source of clean and renewable energy. Combining the growing demand of energy, its increasing value and the appreciation associated to the sustainable development, low head sites formerly considered as non-profitable are now exploitable. Bulb turbines likely to equip such sites are traditionally developed on model using right angle transmission leading to piers enlargement for power take off shaft passage, thus restricting possibilities to have fully homologous hydraulic passages. Aiming to sustain good quality development on fully homologous scale model of bulb turbines, the Hydraulic Machines Laboratory (LAMH) of Laval University has developed a brake with an enhanced power to weight ratio. This powerful brake is small enough to be located in the bulb shell while dissipating power without mandatory test head reduction. This paper first presents the basic technology of this brake and its application. Then both its main performance capabilities and dimensional characteristics will be detailed. The instrumentation used to perform accurate measurements will be finally presented.
Watkin, Laura Jane; Kemp, Paul S; Williams, Ian D; Harwood, Ian A
2012-06-01
The growing importance of the environment and its management has simultaneously emphasized the benefits of hydroelectric power and its environmental costs. In a changing policy climate, giving importance to renewable energy development and environmental protection, conflict potential between stakeholders is considerable. Navigation of conflict determines the scheme constructed, making sustainable hydropower a function of human choice. To meet the needs of practitioners, greater understanding of stakeholder conflict is needed. This paper presents an approach to illustrate the challenges that face small-scale hydropower development as perceived by the stakeholders involved, and how they influence decision-making. Using Gordleton Mill, Hampshire (UK), as an illustrative case, soft systems methodology, a systems modeling approach, was adopted. Through individual interviews, a range of problems were identified and conceptually modeled. Stakeholder bias towards favoring economic appraisal over intangible social and environmental aspects was identified; costs appeared more influential than profit. Conceptual evaluation of the requirements to meet a stakeholder-approved solution suggested a complex linear systems approach, considerably different from the real-life situation. The stakeholders introduced bias to problem definition by transferring self-perceived issues onto the project owner. Application of soft systems methodology caused a shift in project goals away from further investigation towards consideration of project suitability. The challenge of sustainable hydropower is global, with a need to balance environmental, economic, and social concerns. It is clear that in this type of conflict, an individual can significantly influence outcomes; highlighting the need for more structured approaches to deal with stakeholder conflicts in sustainable hydropower development.
NASA Astrophysics Data System (ADS)
Watkin, Laura Jane; Kemp, Paul S.; Williams, Ian D.; Harwood, Ian A.
2012-06-01
The growing importance of the environment and its management has simultaneously emphasized the benefits of hydroelectric power and its environmental costs. In a changing policy climate, giving importance to renewable energy development and environmental protection, conflict potential between stakeholders is considerable. Navigation of conflict determines the scheme constructed, making sustainable hydropower a function of human choice. To meet the needs of practitioners, greater understanding of stakeholder conflict is needed. This paper presents an approach to illustrate the challenges that face small-scale hydropower development as perceived by the stakeholders involved, and how they influence decision-making. Using Gordleton Mill, Hampshire (UK), as an illustrative case, soft systems methodology, a systems modeling approach, was adopted. Through individual interviews, a range of problems were identified and conceptually modeled. Stakeholder bias towards favoring economic appraisal over intangible social and environmental aspects was identified; costs appeared more influential than profit. Conceptual evaluation of the requirements to meet a stakeholder-approved solution suggested a complex linear systems approach, considerably different from the real-life situation. The stakeholders introduced bias to problem definition by transferring self-perceived issues onto the project owner. Application of soft systems methodology caused a shift in project goals away from further investigation towards consideration of project suitability. The challenge of sustainable hydropower is global, with a need to balance environmental, economic, and social concerns. It is clear that in this type of conflict, an individual can significantly influence outcomes; highlighting the need for more structured approaches to deal with stakeholder conflicts in sustainable hydropower development.
12. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 SMALL PELTONDOBLE IMPULSE ...
12. POWERHOUSE INTERIOR SHOWING EXCITER No. 2 SMALL PELTON-DOBLE IMPULSE WHEEL, HAND-CONTROLLED GATE VALVE, AND NOZZLE. VIEW TO SOUTHWEST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate ...
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates ...
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
Comprehensive Renewable Energy Feasibility Study for the Makah Indian Tribe
DOE Office of Scientific and Technical Information (OSTI.GOV)
RobertLynette; John Wade; Larry Coupe
The purpose of this project was to determine the technical feasibility, economic viability, and potential impacts of installing and operating a wind power station and/or small hydroelectric generation plants on the Makah reservation. The long-term objective is to supply all or a portion of Tribe's electricity from local, renewable energy sources in order to reduce costs, provide local employment, and reduce power outages. An additional objective was for the Tribe to gain an understanding of the requirements, costs, and benefits of developing and operating such plants on the reservation. The Makah Indian Reservation, with a total land area of forty-sevenmore » square miles, is located on the northwestern tip of the Olympic Peninsula in Washington State. Four major watersheds drain the main Reservation areas and the average rainfall is over one hundred inches per year. The reservation's west side borders the Pacific Ocean, but mostly consists of rugged mountainous terrain between 500 and 1,900 feet in elevation. Approximately 1,200 tribal members live on the Reservation and there is an additional non-Indian residential population of about 300. Electric power is provided by the Clallam County PUD. The annual usage on the reservation is approximately 16,700 mWh. Project Work Wind Energy--Two anemometer suites of equipment were installed on the reservation and operated for a more than a year. An off-site reference station was identified and used to project long-term wind resource characteristics at the two stations. Transmission resources were identified and analyzed. A preliminary financial analysis of a hypothetical wind power station was prepared and used to gauge the economic viability of installation of a multi-megawatt wind power station. Small Hydroelectric--Two potential sites for micro/small-hydro were identified by analysis of previous water resource studies, topographical maps, and conversations with knowledgeable Makah personnel. Field trips were conducted to collect preliminary site data. A report was prepared by Alaska Power & Telephone (Larry Coupe) including preliminary layouts, capacities, potential environmental issues, and projected costs. Findings and Conclusions Wind Energy The average wind resources measured at both sites were marginal, with annual average wind speeds of 13.6-14.0 mph at a 65-meter hub height, and wind shears of 0.08-0.13. Using GE 1.5 MW wind turbines with a hub height of 65 meters, yields a net capacity factor of approximately 0.19. The cost-of-energy for a commercial project is estimated at approximately 9.6 cents per kWh using current costs for capital and equipment prices. Economic viability for a commercial wind power station would require a subsidy of 40-50% of the project capital cost, loans provided at approximately 2% rate of interest, or a combination of grants and loans at substantially below market rates. Recommendations: Because the cost-of-energy from wind power is decreasing, and because there may be small pockets of higher winds on the reservation, our recommendation is to: (1) Leave one of the two anemometer towers, preferably the 50-meter southern unit MCC, in place and continue to collect data from this site. This site would serve as an excellent reference anemometer for the Olympic Peninsula, and, (2) If funds permit, relocate the northern tower (MCB) to a promising small site closer to the transmission line with the hope of finding a more energetic site that is easier to develop. Small Hydroelectric There are a very limited number of sites on the reservation that have potential for economical hydroelectric development, even in conjunction with water supply development. Two sites emerged as the most promising and were evaluated: (1) One utilizing four creeks draining the north side of the Cape Flattery peninsula (Cape Creeks), and (2) One on the Waatch River to the south of Neah Bay. The Cape Creeks site would be a combination water supply and 512 kW power generation facility and would cost a approximately $11,100,000. Annual power generation would be approximately 1,300,000 kWh and the plant would have a cost-of-energy of approximately 65 cents per kWh, substantially above market rates. The Waatch site would also be a combination water supply and power generation facility. It would have a rated capacity of 935 kW and would cost approximately $16,400,000. Annual power generation would be approximately 3,260,000 kWh and the plant would have a cost-of-energy of approximately 38 cents per kWh, also substantially above market rates. Recommendation: Stand-alone hydroelectric development is not commercially viable. The Tribal Council should not pursue development of hydroelectric facilities on the Makah Reservation unless they are an adjunct to a water supply development, and the water supply systems absorbs almost all the capital cost of the project.« less
Essays in Applied Microeconomics
NASA Astrophysics Data System (ADS)
Severnini, Edson Roberto
This dissertation consists of three studies analyzing causes and consequences of location decisions by economic agents in the U.S. In Chapter 1, I address the longstanding question of the extent to which the geographic clustering of economic activity may be attributable to agglomeration spillovers as opposed to natural advantages. I present evidence on this question using data on the long-run effects of large scale hydroelectric dams built in the U.S. over the 20th century, obtained through a unique comparison between counties with or without dams but with similar hydropower potential. Until mid-century, the availability of cheap local power from hydroelectric dams conveyed an important advantage that attracted industry and population. By the 1950s, however, these advantages were attenuated by improvements in the efficiency of thermal power generation and the advent of high tension transmission lines. Using a novel combination of synthetic control methods and event-study techniques, I show that, on average, dams built before 1950 had substantial short run effects on local population and employment growth, whereas those built after 1950 had no such effects. Moreover, the impact of pre-1950 dams persisted and continued to grow after the advantages of cheap local hydroelectricity were attenuated, suggesting the presence of important agglomeration spillovers. Over a 50 year horizon, I estimate that at least one half of the long run effect of pre-1950 dams is due to spillovers. The estimated short and long run effects are highly robust to alternative procedures for selecting synthetic controls, to controls for confounding factors such as proximity to transportation networks, and to alternative sample restrictions, such as dropping dams built by the Tennessee Valley Authority or removing control counties with environmental regulations. I also find small local agglomeration effects from smaller dam projects, and small spillovers to nearby locations from large dams. Lastly, I find relatively small costs of environmental regulations associated with hydroelectric licensing rules. In Chapter 2, I study the joint choice of spouse and location made by individuals at the start of their adult lives. I assume that potential spouses meet in a marriage market and decide who to marry and where they will live, taking account of varying economic opportunities in different locations and inherent preferences for living near the families of both spouses. I develop a theoretical framework that incorporates a collective model of household allocation, conditional on the choice of spouse and location, with a forward-looking model of the marriage market that allows for the potential inability of spouses to commit to a particular intra-household sharing rule. I address the issue of unobserved heterogeneity in the tastes of husbands and wives using a control-function approach that assumes there is a one-to-one mapping between unobserved preferences of the two spouses and their labor supply choices. Estimation results for young dual-career households in the 2000 Census lead to three main findings. First, I find excess sensitivity of the sharing rule that governs the allocation of resources among couples to the conditions in the location they actually choose, implying that spouses cannot fully commit to a sharing rule. Second, I show that the lack of commitment has a relatively larger effect on the share of family resources received by women. Third, I find that the failure of full commitment can explain nearly all of the gap in the interstate migration rates of single and married people in the U.S. Finally, in Chapter 3, I examine unintended consequences of environmental regulations affecting the location of power plants. I present evidence that while hydroelectric licensing rules do conserve the wilderness and the wildlife by restricting the development of hydro projects in some counties, they lead to more greenhouse gas emissions in those same locations. Such environmental regulations aimed to preserve natural ecosystems do not seem to really protect nature. Basically, land conservation regulations give rise to a replacement of hydropower, which is a renewable, non-emitting source of energy, with conventional fossil-fuel power, which is highly pollutant. Restrictions imposed by hydroelectric licensing rules might be used as leverage by electric utilities to get permits to expand thermal power generation. Each megawatt of hydropower potential that is not developed because of those regulations induces the production of the average emissions of carbon dioxide per megawatt of U.S. coal-fired power plants. Environmental regulations focusing only on the preservation of ecosystems appears to stimulate dirty substitutions within electric utilities regarding electricity generation.
Small hydroelectric power plant for Aztec, New Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frey, E.W.
1982-05-01
Preliminary engineering results and the outcome of other specific studies associated with the establishment of a hydroelectric power plant at Aztec, New Mexico, are presented, with particular emphasis on estimated costs of construction and long-term operation. Four alternative levels of effort were evaluated. Recommendations, based primarily on cost effectiveness, are presented along with material useful as a basis for a possible follow-on Phase II study. At least three levels of effort appear economically attractive alternatives for the city to pursue.
Luby, Brittany
2015-01-01
This paper explores how Anishinabek women managed their households during the hydroelectric boom of the 1950s and provides new insight into flooding impact analyses. To date, historians have sought to understand how hydroelectric development compromised "subsistence" living. Research has addressed declining fish and game populations and the corresponding decline in male employment. But, what do these trends mean once the nets and traps have been emptied? By focusing on the family home, we discover that hydroelectric power generation on the Winnipeg River disrupted the environment's ability to provide resources necessary to maintain women's reproductive health (especially breast milk). Food shortages caused by hydroelectric development in the postwar era compromised Anishinabek women's ability to raise their children in accordance with cultural expectations. What emerges from this analysis is a new lens through which to theorize the voluntary enrolment of Anishinabek children in residential schools in northwestern Ontario.
Comprehensive Renewable Energy Feasibility Study for Sealaska Corporation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Lynette; John Wade: Larry Coupe
2006-06-30
The purposes of this project were: (1) to conduct a comprehensive feasibility study to determine the potential sustainability of wind and/or small hydroelectric power plants on Southeast Alaska native village lands, and (2) to provide the villages with an understanding of the requirements, costs, and benefits of developing and operating wind or small hydroelectric power plants. The program was sponsored by the Tribal Energy program, Office of Energy Efficiency and Renewable Energy, US Department of Energy. The Contractor was Sealaska Corporation, the Regional Native Corporation for Southeast Alaska that includes 12 village/urban corporations. Most villages are isolated from any centralmore » electric transmission and use diesel-electric systems for power generation, making them prime candidates for deploying renewable energy sources. Wind Energy - A database was assembled for all of the candidate sites in SE Alaska, including location, demographics, electricity supply and demand, existing and planned transmission interties with central generation, topographical maps, macro wind data, and contact personnel. Field trips were conducted at the five candidate villages that were deemed most likely to have viable wind resources. Meetings were held with local village and utility leaders and the requirements, costs, and benefits of having local renewable energy facilities were discussed. Two sites were selected for anemometry based on their needs and the probability of having viable wind resources – Yakutat and Hoonah. Anemometry was installed at both sites and at least one year of wind resource data was collected from the sites. This data was compared to long-term data from the closest weather stations. Reports were prepared by meteorologist John Wade that contains the details of the measured wind resources and energy production projections. Preliminary financial analysis of hypothetical wind power stations were prepared to gauge the economic viability of installing such facilities at each site. The average wind resources measured at Yakutat at three sites were very marginal, with an annual average of 4.0 mps (9 mph) at 60 meters above ground level. At Hoonah, the average wind resources measured on the 1,417 ft elevation ridge above the village were very low, with a six-month average of 3.9 mps (8.7 mph) at 60 meters above ground level. The wind resources at both sites were not sufficient to justify installation of wind turbines. In summary, although there are several known windy spots in SE Alaska (e.g., Skagway), we were not able to identify any isolated Native American villages that utilize diesel-electric power generation that have commercially viable wind resources. Small Hydroelectric - The study focused on the communities associated with Sealaska Corporation that use diesel-electric for electricity and have a potential for hydroelectric power generation. Most of them have had at least an assessment of hydroelectric potential, and a few have had feasibility studies of potential hydroelectric projects. Although none of the sites examined are financially viable without substantial grant funding, Hoonah, Kake, and Yakutat appear to have the best potential for new hydro facilities.« less
Hydropower in Southeast United States, -a Hydroclimatological Perspective
NASA Astrophysics Data System (ADS)
Engstrom, J.
2016-12-01
Hydropower is unique among renewable energy sources for the ability to store its fuel (water) in reservoirs. The relationship between discharge, macro-scale drivers, and production is complex since production depends not only on water availability, but also upon decisions made by the institution owning the facility that has to consider many competing interests including economics, drinking water supply, recreational uses, etc. This analysis shows that the hydropower plants in Southeast U.S. (AL, GA, NC, SC, and TN) exhibit considerable year to year variability in production. Although the hydroclimatology of the Southeast U.S. has been analyzed partially, no previous study has linked the region's hydroelectricity production to any reported causes of interannual hydroclimatological variability, as has been completed in other regions. Due to the current short-term hydroelectricity production forecasts, the water resource is not optimized from a hydropower perspective as electricity generating potential is not maximized. The results of this study highlight the amount of untapped hydroelectricity that could be produced if long term hydroclimate and large-scale climate drivers were considered in production forecasts.
Hydrogen from renewable energy: A pilot plant for thermal production and mobility
NASA Astrophysics Data System (ADS)
Degiorgis, L.; Santarelli, M.; Calì, M.
In the mainframe of a research contract, a feasibility pre-design study of a hydrogen-fuelled Laboratory-Village has been carried out: the goals are the design and the simulation of a demonstration plant based on hydrogen as primary fuel. The hydrogen is produced by electrolysis, from electric power produced by a mix of hydroelectric and solar photovoltaic plants. The plant will be located in a small remote village in Valle d'Aosta (Italy). This country has large water availability from glaciers and mountains, so electricity production from fluent water hydroelectric plants is abundant and cheap. Therefore, the production of hydrogen during the night (instead of selling the electricity to the grid at very low prices) could become a good economic choice, and hydrogen could be a competitive local fuel in term of costs, if compared to oil or gas. The H 2 will be produced and stored, and used to feed a hydrogen vehicle and for thermal purposes (heating requirement of three buildings), allowing a real field test (Village-Laboratory). Due to the high level of pressure requested for H 2 storage on-board in the vehicle, the choice has been the experimental test of a prototype laboratory-scale high-pressure PEM electrolyzer: a test laboratory has been designed, to investigate the energy savings related to this technology. In the paper, the description of the dynamic simulation of the plant (developed with TRNSYS) together with a detailed design and an economic analysis (proving the technical and economical feasibility of the installation) has been carried out. Moreover, the design of the high-pressure PEM electrolyzer is described.
NASA Astrophysics Data System (ADS)
Manful, D. Y.; Kaule, G.; Wieprecht, S.; Rees, J.; Hu, W.
2009-12-01
Hydroelectric Power (HEP) is proving to be a good alternative to carbon based energy. In the past hydropower especially large scale hydro attracted significant criticism as a result of its impact on the environment. A new breed of hydroelectric dam is in the offing. The aim is to have as little a footprint as possible on the environment in both pre and post construction phases and thus minimize impact on biodiversity whilst producing clean renewable energy. The Bui dam is 400 MW scheme currently under development on the Black Volta River in the Bui national park in Ghana. The reservoir created by the Bui barrage is expected to impact (through inundation) the habitat of two species of hippos know to exist in the park, the Hippopotamus amphibius and the Choeropsis liberiensis. Computer-based models present a unique opportunity to assess quantitatively the impact of the new reservoir on the habitat of the target species in this case the H. amphibious. Until this undertaking, there were very few studies documenting the habitat of the H. amphibious let alone model it. The work and subsequent presentation will show the development of a habitat model for the Hippopotamus amphibius. The Habitat Information retrieval Program based on Streamflow Analysis, in short HIPStrA, is a one dimensional (1D) in-stream, spatially explicit hybrid construct that combines physico-chemical evidence and expert knowledge to forecast river habitat suitability (Hs) for the Hippopotamus amphibius. The version of the model presented is specifically developed to assess the impact of a reservoir created by a hydroelectric dam on potential dwelling areas in the Bui gorge for hippos. Accordingly, this version of HIPStrA simulates a special reservoir suitability index (Rsi), a metric that captures the”hippo friendliness” of any lake or reservoir. The impact of measured and simulated flood events as well as low flows, representing extreme events is also assessed. Recommendations are made for the operating rules of the reservoir in the post-construction phase of the dam. A great deal of work has been done on the effects of stream flow changes on fish especially salmonids. Very little work however has been done assessing the impact of hydropower schemes on aquatic mammals especially in Africa. HIPStrA is the first attempt at developing a computer-based habitat model for a large aquatic megaherbivore. The need for energy for development, the availability of large rivers and a rich biodiversity base in Africa makes a case for careful and ecological smart exploitation. The overarching aim of the study is the sustainable development of hydroelectric power through the use of methodologies and tools to rigorously assess changes in instream conditions that impact aquatic mammals.
Haro, Alex; Castro-Santos, Ted; Boubée, Jacques
2000-01-01
Downstream migrant eels were monitored near a small (51 MW) hydroelectric facility on the Connecticut River (Massachusetts, USA) for two seasons using acoustic and radio telemetry. Eels frequently made several attempts over periods of one to several days to pass the station. Did activity of eels was variable, although most movements occurred at night. Eels occupied a variety of depths in the forebay area, but spent the greater proportion of time at or near the bottom (10 m), occasionally venturing to the surface. Horizontal movements usually spanned across the entire width of the forebay. There was no significant relationship between duration of forebay presence and either flow or light intensity. Although all telemetered eels passed via the turbines, some migrant eels did use a surface bypass.
Climate change impacts on high-elevation hydroelectricity in California
NASA Astrophysics Data System (ADS)
Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.
2014-03-01
While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.
NASA Astrophysics Data System (ADS)
Saounatsou, Chara; Georgi, Julia
2014-08-01
The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.
NASA Astrophysics Data System (ADS)
Savostjanov, V. N.; Dvalishvili, V. V.; Sakharov, V. N.; Isajkin, A. S.; Frishter, L.; Starchevsky, A. V.
1991-12-01
The development of many-year-frost rock (MYFR) region hydrotechnic construction, the MYFR being quite a reliable construction based provided it is situated outside the seasonal temperature fluctuation layer, requires the rock stress-deformed state evaluating criteria working out with maximal possible account of static, dynamic, blast-hole drilling, and temperature effect on their properties. In estimating the hydroelectrical power station (HPS) underground building stress-deformed state the present work refers to experimental data and calculations, received by solving a linear task with further account of the building profile changing effect in the process of construction and the concrete and rock mechanic properties heterogeneity. The proposed order is justified, provided the rock mass defrosting depth value is small as compared to the rock separate block dimensions and it corresponds to the building construction period. The results are given for the Kolymskaya Hydroelectrical Power Station building cross-section, considered under flat deformation conditions.
River Devices to Recover Energy with Advanced Materials (River DREAM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMahon, Daniel P.
2013-07-03
The purpose of this project is to develop a generator called a Galloping Hydroelectric Energy Extraction Device (GHEED). It uses a galloping prism to convert water flow into linear motion. This motion is converted into electricity via a dielectric elastomer generator (DEG). The galloping mechanism and the DEG are combined to create a system to effectively generate electricity. This project has three research objectives: 1. Oscillator development and design a. Characterize galloping behavior, evaluate control surface shape change on oscillator performance and demonstrate shape change with water flow change. 2. Dielectric Energy Generator (DEG) characterization and modeling a. Characterize andmore » model the performance of the DEG based on oscillator design 3. Galloping Hydroelectric Energy Extraction Device (GHEED) system modeling and integration a. Create numerical models for construction of a system performance model and define operating capabilities for this approach Accomplishing these three objectives will result in the creation of a model that can be used to fully define the operating parameters and performance capabilities of a generator based on the GHEED design. This information will be used in the next phase of product development, the creation of an integrated laboratory scale generator to confirm model predictions.« less
Study on safety operation for large hydroelectric generator unit
NASA Astrophysics Data System (ADS)
Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.
2012-11-01
Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... opportunity to purchase and/or market the power that would be generated by such development under a lease of... develop hydroelectric power at Granby Dam Outlet, and power purchasing and/or marketing considerations... Office (GP-2200), P.O. Box 36900, Billings, MT 59107-6900. Information related to Western's purchasing...
Indian energy sources in 1980's
NASA Astrophysics Data System (ADS)
Chaturvedi, A. C.
Indian energy sources for electrical power generation are surveyed with a view to the development of the available hydroelectric resources. The capital-intensive nature of hydroelectric projects and their long gestation periods have impeded the rapid exploitation of the hydroelectric resources in the country, which are expected to provide 37% of the 16,200 MW capacity anticipated by 2001. Alternative sources of power such as solar and wind energy, biogas conversion and the use of industrial waste heat to produce electricity are discussed with case studies presented.
NASA Astrophysics Data System (ADS)
Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.
2016-12-01
We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.
Small and Shaping the Future Energy Eco-house System
NASA Astrophysics Data System (ADS)
Furukawa, Ryuzo; Takahashi, Hideyuki; Sato, Yoshinori; Sasaki, Hiroshi; Isu, Norifumi; Ohtsuka, Masuo; Tohji, Kazuyuki
2010-11-01
The objective of this research is to develop the elemental technology of the small and thin energy collection system from water, wind, and others in the house, and examine them at the eco-house which will be built at Tohoku University on March 2010. This small energy storage system will contribute to reduce 10% of greenhouse gas emission from household electricity. This project is done by three following groups. 1st group (NEC-Tokin Co. Ltd.) will develop the technologies on the accumulation of electric power pressured from low electric power in which electricity is generated and on the cooperation with AC power supply used for domestic use for this eco-house system. 2nd group (INAX Co. Ltd.) will develop the elemental technology of the slight energy collection system from tap water in the home using a small hydroelectric generator for this eco-house system. 3rd group (Shoei Co. Ltd.) will develop the technologies on existent magnetic gear device, health appliances (Exercise bike), wind power generator, for this eco-house system. Tokoku University compiles these groups. Furthermore, I develop a search of unused small energy and the use technology, and propose a new energy supply system using solar cell and Li ion secondary battery.
Rule, Bridget M; Worth, Zeb J; Boyle, Carol A
2009-08-15
In order to make the best choice between renewable energy technologies, it is important to be able to compare these technologies on the basis of their sustainability, which may include a variety of social, environmental, and economic indicators. This study examined the comparative sustainability of four renewable electricity technologies in terms of their life cycle CO2 emissions and embodied energy, from construction to decommissioning and including maintenance (periodic component replacement plus machinery use), using life cycle analysis. The models developed were based on case studies of power plants in New Zealand, comprising geothermal, large-scale hydroelectric, tidal (a proposed scheme), and wind-farm electricity generation. The comparative results showed that tidal power generation was associated with 1.8 g of CO2/kWh, wind with 3.0 g of CO2/kWh, hydroelectric with 4.6 g of CO2/kWh, and geothermal with 5.6 g of CO2/kWh (not including fugitive emissions), and that tidal power generation was associated with 42.3 kJ/kWh, wind with 70.2 kJ/kWh, hydroelectric with 55.0 kJ/kWh, and geothermal with 94.6 kJ/kWh. Other environmental indicators, as well as social and economic indicators, should be applied to gain a complete picture of the technologies studied.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.
Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.
Worldwide Emerging Environmental Issues Affecting the U.S. Military
2010-09-01
scale, biological process to remove CO2 from the environment and transform it into solid carbonate. The procedure produces approximately two pounds of...Resources Fuel Violence in Eastern D.R. Congo……………………………..5 7.2 Protests in Peru over Dam Irrigation and Hydroelectric Project Part of a Regional...the synergies developed among the three on chemicals and waste — the Basel, Rotterdam and Stockholm Conventions (see First Joint Meeting of the Main
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam M; Smith, Brennan T
Small hydropower plants supply reliable renewable energy to the grid, though few new plants have been developed in the Unites States over the past few decades due to complex environmental challenges and poor project economics. This paper describes the current landscape of small hydropower development, and introduces a new approach to facility design that co-optimizes the extraction of hydroelectric power from a stream with other important environmental functions such as fish, sediment, and recreational passage. The approach considers hydropower facilities as an integrated system of standardized interlocking modules, designed to sustain stream functions, generate power, and interface with the streambed.more » It is hypothesized that this modular eco-design approach, when guided by input from the broader small hydropower stakeholder community, can lead to cost savings across the facility, reduced licensing and approval timelines, and ultimately, to enhanced resiliency through improved environmental performance over the lifetime of the project.« less
Dispatch Control with PEV Charging and Renewables for Multiplayer Game Application
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Nathan; Johnson, Brian; McJunkin, Timothy
This paper presents a demand response model for a hypothetical microgrid that integrates renewable resources and plug-in electric vehicle (PEV) charging systems. It is assumed that the microgrid has black start capability and that external generation is available for purchase while grid connected to satisfy additional demand. The microgrid is developed such that in addition to renewable, non-dispatchable generation from solar, wind and run of the river hydroelectric resources, local dispatchable generation is available in the form of small hydroelectric and moderately sized gas and coal fired facilities. To accurately model demand, the load model is separated into independent residential,more » commercial, industrial, and PEV charging systems. These are dispatched and committed based on a mixed integer linear program developed to minimize the cost of generation and load shedding while satisfying constraints associated with line limits, conservation of energy, and ramp rates of the generation units. The model extends a research tool to longer time frames intended for policy setting and educational environments and provides a realistic and intuitive understanding of beneficial and challenging aspects of electrification of vehicles combined with integration of green electricity production.« less
High Efficiency Turbine Generator for Instream Electric Power Production
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelecy, Patrick M.
Concerns over global warming due to carbon emissions have spurred an interest in such renewable energy alternatives as hydroelectric, wind, solar, geothermal, and biomass. Of all of these, hydroelectric power offers perhaps the greatest potential for supplying a significant portion of our nation's energy needs. To realize this potential, however, this technology needs to expand beyond traditional dam based installations (for which there are relatively few suitable remaining sites) into the vast number of open flow installations potentially available in rivers, canals, tidal streams and open ocean sites. To help promote this expansion, this project focused on the development ofmore » an advanced, vertical axis, hydrokinetic power generator (HPG) technology for open flow applications. Two key features investigated for this were (1) an active blade pitch control system that provides independent control of the turbine blades, and (2) a low-profile, low-speed, high-torque electric generator suitable for direct coupling to the turbine (no gearbox). Both systems are based on a unique, disk-shape, high performance electromechanical design that is potentially low cost, compact, light-weight, and efficient. Blade actuator and generator designs were developed and optimized for this application. They were then incorporated into several HPG designs based on an optimized H-Darrieus turbine structure that was also developed. Three HPG sizes were explored (10kW, 25kW and 50kW) to assess scalability. For each size, two HPG versions were developed: one with the electric generator mounted above the turbine and one with it integrated into the turbine body. Each provided certain benefits and illustrated the versatility of this technology. Design and performance specifications were calculated and comparisons were made with commercial hydrokinetic turbine products. Based on these comparisons, this technology was smaller and significantly lighter (by up to 50%) in the higher power ratings. A preliminary cost analysis was performed for these designs. Costs were determined in prototyping (1-10), small (100), and medium (1000) production volumes. Installed costs were then estimated and compared to wind and solar energy products of similar rating. Based on that comparison, the installed cost of this technology is expected to be similar in small production volumes and lower in medium (or greater) production volumes. Finally, the levelized cost of energy (LCOE) was calculated for the 50kW HPG and compared to other renewables (solar, wind, small and large scale hydro) based on published data. The LCOE estimated for this system ($31/MWh-48/MWh dollars) was found to be quite competitive with other renewables, especially if higher production volumes can be achieved. Based on these findings, this technology should be successful if commercialized and promote the expansion of river-based power generation.« less
NASA Astrophysics Data System (ADS)
Jidin, Razali; Othman, Bahari
2013-06-01
The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.
78 FR 47695 - Sam Rayburn Dam Power Rate
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... replacements in the hydroelectric generating facilities and small increases to annual operations and... K. McDonald, Vice President for Corporate Operations/Chief Operating Officer, Southwestern Power... Code of Federal Regulations (18 CFR 300). Southwestern markets power from 24 multi-purpose reservoir...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... period for accepting written proposals detailed in the Notice of Intent to Accept Proposals, Select One...
Finer, Matt; Jenkins, Clinton N.
2012-01-01
Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics. PMID:22529979
Finer, Matt; Jenkins, Clinton N
2012-01-01
Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics.
18 CFR 4.95 - Surrender of exemption.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...
18 CFR 4.95 - Surrender of exemption.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...
18 CFR 4.95 - Surrender of exemption.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...
18 CFR 4.95 - Surrender of exemption.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.95 Surrender of exemption...) information appropriate to the disposition and restoration of the project works and lands. The petition must set forth the exemption holder's plans with respect to disposition and restoration of the project...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...
16. INTERIOR OF BATHROOM NUMBER ONE SHOWING BUILTIN MEDICINE CABINET ...
16. INTERIOR OF BATHROOM NUMBER ONE SHOWING BUILT-IN MEDICINE CABINET FLANKED BY SMALL 1-LIGHT OVER 1-LIGHT, DOUBLE-HUNG, WOOD-FRAMED WINDOWS IN A GROUPED ARRANGEMENT. VIEW TO NORTHEAST. - Rush Creek Hydroelectric System, Clubhouse Cottage, Rush Creek, June Lake, Mono County, CA
Filling temporary underground structures and workings at high-head hydro developments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ilyushin, V.F.
1994-12-01
Examples of backfilling temporary underground structures and workings at hydroelectric stations in Russia are cited. Structures backfilled include temporary tunnels and auxiliary workings (shafts, chambers, etc.). Detail drawings illustrate many of the examples. Examples of backfilling at a number of hydropower plants are given; however, the main emphasis is on construction of Nurek Hydroelectric Station. 8 refs., 11 figs.
NASA Astrophysics Data System (ADS)
Tremblay, Francois
Historically, the rivers of Quebec have played outstanding parts in the territory cultural and political establishment, in the homeland discovery and colonization processes, and also in its economic development. One after another, transportation, trade, log driving and hydroelectricity production have been the dominant usage on these watercourses, and any other users had to give in. For the last thirty years, the wastewater cleaning efforts, the watercourse public access development as well as the withdrawal on some pollution producing practices like log driving, have given rise to a new recreational usage on many of these watercourses. In reality, this recreational usage barely put up with the magnitude of the hydro electricity production. This results in conflicts with increasing rate and intensity. The recreational users' demands are taken in consideration by the hydro electricity projects participants. However this consideration doesn't seem to satisfy the recreational users' expectations due to fundamental opposed viewpoints and principles which are being promoted by each group. Such radical divergence between these two groups introduces the notion of strategy being promoted by one group to be able to pressure the other group's practices. These strategies development depends on the participants' ability to force social issues upon the others pressing them to reconsider their own underlying principles. In the case of the conflict opposing the recreational wastewater industry with the small private hydroelectric projects on the Gatineau River, the recreational users, with the use of recontextualisation (or reframing of information) processes have been able to slow down and even momentarily stop hydro electric projects there. These recontextualisation processes are based on landscape related social representations which emphasize the aesthetic, emblematic and identity dimensions of the Gatineau River. These social representations introduce several paradoxes in the conflict between the recreational whitewater and hydroelectricity industries. These paradoxes force a reassessment on the traditional ways of dealing with (a) the area where the participants have an effect on (b) the temporal aspects of the issues, as well as (c) the social reference rationalizing their actions. In addition, these three recontextualisations, (spatial, temporal and social) put forward new ways about how to intervene on the river. These proposals, while relying on a coherent outlook on the world, are carried out into a local scale society building project, the landscape of a natural Gatineau river project. The research course of action developed for this thesis allows understanding the richness and intensity of the participants' radicalism experience. Beyond the typical "not in my backyard" reaction, the extreme oppositions between different participants quite often reveal some consistent, multifaceted, rightful and operational outlooks on the world. To understand ambitions, motivations and the projects, underlying the extremism of the participants, allow considering this radicalism from a viewpoint that is constructive for the participants as a whole, involved in territory planning.
18 CFR 4.303 - Post-filing procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... § 4.105(b)(1) for an application for case-specific exemption of a small hydroelectric power project, a... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Post-filing procedures. 4.303 Section 4.303 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...
Alternative Energy Lessons in Scotland
NASA Astrophysics Data System (ADS)
Boyle, Julie
2010-05-01
In Scotland the new science curriculum for pupils aged 12 to 15 shall include the following outcomes: "Using my knowledge and understanding, I can express an informed view on a national or global environmental issue;" "I have participated in constructing a model to harness a renewable source of energy and can investigate how to optimise the output;" and "I can discuss why it is important to me and to the future of the world that alternatives to fossil fuels are developed." There will be an emphasis on creating lessons that will nurture responsible citizens, improve pupil engagement and allow students to develop their team working skills. To help teachers plan lessons to address this, the Scottish Schools Equipment Research Centre and Edinburgh University made teaching materials on four renewable energy resources. This poster describes how their suggested activities on solar cells, wind turbines, hydroelectric power stations and wave power were used in science lessons with twelve year old students. After an initial class discussion based on issues related to climate change and diminishing fossil fuel supplies, a workshop activity was carried out in three stages. The students were issued with a fact sheet about one of four imaginary islands (Skisdale, Cloudy Island, Surfsville and Sun City) and they were asked to work in teams to choose the most suitable method of generating electricity for their island. Issues such as costs, where it will be sited and environmental implications were considered. They were then asked to conduct practical activities by constructing and testing models for these forms of renewable energy. To conclude, they presented their proposal to the rest of the class with reasoned explanations. The kits used in the lessons can be purchased from Anderson Scientific (sales@andersonscientific.co.uk). The solar cells were simply connected to a voltmeter. The wind and hydroelectric groups used the same basic equipment. This was made using a small water bottle, insulating tape, a screwdriver, a connecting block, a solar motor, a plastic fan and thin wires. The only difference was that the wind groups were issued hairdryers and the hydroelectric groups worked at a sink. The wave turbine was constructed in a similar way using the bases from two 5 litre water bottles. Various investigations were conducted into the factors affecting the voltage produced. For instance, the effect of the distance from the light source, the area of the solar cell, the type of blades, the depth of water and the wind speed were studied. The lessons reinforced their understanding of ideas covered in Science and Geography, such as voltage, power, fair tests, compass directions and map contours. Students also had the opportunity to practise connecting electrical components in series and they consolidated their understanding of energy changes, observing that generators convert kinetic energy to electrical energy. The activities allowed students to learn the basics of how renewable energy technologies work. The tasks provided a hands-on experience of renewable energy being used to power small-scale electrical devices such as an LED. The students also gained an appreciation of the complex issues involved in planning and implementing renewable energy generation in the real world.
Dams in the Amazon: Belo Monte and Brazil's hydroelectric development of the Xingu River Basin.
Fearnside, Phillip M
2006-07-01
Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil's proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country's national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey
NASA Astrophysics Data System (ADS)
Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.
2014-12-01
Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.
78 FR 6319 - Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7019-068] Eastern... an order amending license Article 401 for Eastern Hydroelectric Corporation's (Eastern Hydroelectric....\\1\\ On January 11, 2013, Eastern Hydroelectric filed a request for rehearing of Commission staff's...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-01-01
Updated information on water resources in the Potomac River Basin is presented for use by the FERC and its staff when considering hydroelectric licensing and other work. The report presents data on water resource developments, existing and potential, and on water use by existing and projected steam-electric generating facilities. Past and present planning studies are summarized.
18 CFR 4.94 - Standard terms and conditions of exemption.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...
18 CFR 4.94 - Standard terms and conditions of exemption.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...
18 CFR 4.94 - Standard terms and conditions of exemption.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...
NASA Astrophysics Data System (ADS)
Resende, A. F. D.; Silva, T. S. F.; Silva, J. D. S.; Piedade, M. T. F.; Streher, A. S.; Ferreira-Ferreira, J.; Schongart, J.
2017-12-01
The flood pulse of large Amazonian Rivers is characterized by predictable high- and low-water periods during the annual cycle, and is the main driving force in the floodplains regulating decomposition, nutrient cycles, productivity, life cycles and growth rhythms of floodplains' biota. Over at least 20 millions of years, tree species in these ecosystems developed complex adaptative mechanisms to tolerate flooding, such as the tree species Macrolobium acaciifolium (Fabaceae) and Eschweilera tenuifolia (Lecythidaceae) occupying the lower topographic positions in the floodplain forests along the oligothrophic black-water rivers. Tree growth occurs mainly during terrestrial phase, while during the aquatic phase the anoxic conditions result into a cambial dormancy and formation of annual tree rings. The hydroelectric dam Balbina which was installed in the Uatumã River (central Amazonia) during the 1980s altered significantly the flood pulse regime resulting into higher minimum and lower maximum annual water levels. The suppression of the terrestrial phase caused large-scale mortality of flood-adapted trees growing on the lower topographic positions, as evidenced by radiocarbon dating and cross-dating techniques (dendrochronology). In this study we estimated the extension of dead forests using high resolution ALOS/PALSAR radar images, for their detection along a fluvial distance of more than 280 km downstream of the power plant. Further we analyzed tree growth of 60 living individuals of E. tenuifolia by tree-ring analyses comparing the post- and pre-dam periods. We evaluated the impacts of the altered hydrological regime on tree growth considering ontogenetic effects and the fluvial distance of the trees to the dam. Since the Balbina power plant started operating the associated igapó forests lost about 11% of its cover. We found a significant reduction of tree growth of E. tenuifolia during the post-dam period as a consequence of the increasing aquatic phase duration. This impact was stronger for younger trees (<200 yr) and for those growing closer to the hydroelectric dam (<100 km distance). Considering the planning of construction of several dozen dams in the Amazon there is an urgent need to consider these downstream impacts in all discussions of hydroelectric power plants implementation and operation.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
... Associates, Inc.; Salmon Creek Hydroelectric Company; Notice of Transfer of Exemption 1. By letter filed April 18, 2013, Henwood Associates, Inc. and Salmon Creek Hydroelectric Company informed the Commission that the exemption from licensing for the Salmon Creek Hydroelectric Project, FERC No. 3730, originally...
VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER ...
VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER HOUSE WITH OLD BYPASS IN FOREGROUND, SHOWING GLASS BLOCKS PROVIDING LIGHT TO BASEMENT OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...
OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE WITH DAM TO LEFT OF HYDROELECTRIC POWER HOUSE AND ENTRANCE TO OLD LOCK CHAMBER ON RIGHT, VIEW TOWARDS NORTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martin, Robert C.; Mehrhoff, L.A.
1985-01-01
The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purposemore » of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.« less
Multi-time scale energy management of wind farms based on comprehensive evaluation technology
NASA Astrophysics Data System (ADS)
Xu, Y. P.; Huang, Y. H.; Liu, Z. J.; Wang, Y. F.; Li, Z. Y.; Guo, L.
2017-11-01
A novel energy management of wind farms is proposed in this paper. Firstly, a novel comprehensive evaluation system is proposed to quantify economic properties of each wind farm to make the energy management more economical and reasonable. Then, a combination of multi time-scale schedule method is proposed to develop a novel energy management. The day-ahead schedule optimizes unit commitment of thermal power generators. The intraday schedule is established to optimize power generation plan for all thermal power generating units, hydroelectric generating sets and wind power plants. At last, the power generation plan can be timely revised in the process of on-line schedule. The paper concludes with simulations conducted on a real provincial integrated energy system in northeast China. Simulation results have validated the proposed model and corresponding solving algorithms.
Marketable energy resources in Alabama: a partially annotated research bibliography
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-04-01
This bibliography has been compiled to provide a guide to the published research, both basic and applied, on the commercial potential and possible energy contribution of selected domestic renewable and non-renewable energy resources in Alabama. Some of the renewable and non-renewable energy resources documented in published form and highlighted in this bibliography include coal, oil, small-scale hydroelectric power, natural gas, wind energy, waste wood, and uranium. Citations dealing mainly with solar energy can be obtained by contacting organizations involved in the development of solar energy. The information for this publication was derived from a number of sources; including the Geologicalmore » Survey of Alabama, Office of State Planning and Federal Program's Planning Reference Service, US Department of Energy's Technical Information Center at Oak Ridge, Tennessee, School of Mines and Energy Development of the University of Alabama, Mineral Resources Institute and State Mine Experiment Station of the University of Alabama. Each citation is complete insofar as the information was available to the compiler. Most abstracts contain some summary information on uses, technology, and economics. These summaries are not meant to be exhaustive. Users of the bibliography should deal directly with the Technical Information Center, US Department of Energy, PO Box 62, Oak Ridge, Tennessee 37830, or the supporting organization or project investigator as to the availability of copies of completed projects in report or book form. (PSB)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Leathe, Stephen A.; Enk, Michael D.
This study was designed to develop and apply methods to evaluate the cumulative effects of 20 proposed small hydro projects on the fisheries resources of the Swan River drainage located in northwestern Montana. Fish population and reach classification information was used to estimate total populations of 107,000 brook trout, 65,000 cut-throat trout and 31,000 juvenile bull trout within the tributary system. Distribution, abundance, and life history of fish species in the drainage and their contribution to the sport fishery were considered in the cumulative impact analysis. Bull trout were chosen as the primary species of concern because of their extensivemore » use of project areas, sensitivity to streambed sedimentation, and their importance to the lake and river sport fisheries. Dewatering of hydroelectric diversion zones and streambed sedimentation (resulting from forest and small hydro development) were the major impacts considered. The developer proposed to divert up to the entire streamflow during low flow months because maintenance of recommended minimum bypass flows would not allow profitable project operation. Dewatering was assumed to result in a total loss of fish production in these areas. 105 refs., 19 figs., 38 tabs.« less
CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...
CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...
ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Newly Discovered Orangutan Species Requires Urgent Habitat Protection.
Sloan, Sean; Supriatna, Jatna; Campbell, Mason J; Alamgir, Mohammed; Laurance, William F
2018-05-03
Nater, et al.[1] recently identified a new orangutan species (Pongo tapanuliensis) in northern Sumatra, Indonesia-just the seventh described species of living great ape. The population of this critically-endangered species is perilously small, at only ∼800 individuals [1], ranking it among the planet's rarest fauna. We assert that P. tapanuliensis is highly vulnerable to extinction because its remaining habitat is small, fragmented, and poorly protected. While road incursions within its habitat are modest-road density is only one-eighth that of northern Sumatra-over one-fifth of its habitat is zoned for agricultural conversion or is comprised of mosaic agricultural and regrowth/degraded forest. Additionally, a further 8% will be affected by flooding and infrastructure development for a hydroelectric project. We recommend urgent steps to increase the chance that P. tapanuliensis will persist in the wild. Copyright © 2018 Elsevier Ltd. All rights reserved.
Hydroelectric System Response to Part Load Vortex Rope Excitation
NASA Astrophysics Data System (ADS)
Alligné, S.; Nicolet, C.; Bégum, A.; Landry, C.; Gomes, J.; Avellan, F.
2016-11-01
The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope on the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of v = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed to analyse potential interactions between hydraulic excitation sources and electrical components.
New Realities: Energy Security in the 2010s and Implications for the U.S. Military
2014-01-01
a small hydroelectric plant on a tributary of the Hudson...amount to a strong headwind for the viability of the U.S. nuclear industry. Several factors are contributing to this situation. First among...are: (1) A shift in the center of gravity of world oil consumption from the older industrialized nations of the Organization for Economic
Evaluating nature and wilderness in Iceland
Thora Ellen Thorhallsdottir
2002-01-01
Iceland is sparsely populated with towns and farms mostly restricted to coastal lowlands. The countryâs ca 50,000 km2 (19,000 mi2) interior is an uninhabited highland with isolated mountains and large glaciers. At present, only a small part of Icelandâs rich geothermal and hydroelectric resources have been harnessed, but if political commitments to largescale...
VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS ...
VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS NORTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW ...
PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS SOUTHEAST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC ...
HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC ...
HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
NASA Astrophysics Data System (ADS)
Fraser, R.; Coulaud, M.; Aeschlimann, V.; Lemay, J.; Deschenes, C.
2016-11-01
With the growing proportion of inconstant energy source as wind and solar, hydroelectricity becomes a first class source of peak energy in order to regularize the grid. The important increase of start - stop cycles may then cause a premature ageing of runners by both a higher number of cycles in stress fluctuations and by reaching a higher stress level in absolute. Aiming to sustain good quality development on fully homologous scale model turbines, the Hydraulic Machines Laboratory (LAMH) of Laval University has developed a methodology to operate model size turbines on transient regimes such as start-up, stop or load rejection on its test stand. This methodology allows maintaining a constant head while the wicket gates are opening or closing in a representative speed on the model scale of what is made on the prototype. This paper first presents the opening speed on model based on dimensionless numbers, the methodology itself and its application. Then both its limitation and the first results using a bulb turbine are detailed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...
OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...
OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Regulatory Approaches for Adding Capacity to Existing Hydropower Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Aaron L.; Curtis, Taylor L.; Kazerooni, Borna
In 2015, hydroelectric generation accounted for more than 6 percent of total net electricity generation in the United States and 46 percent of electricity generation from all renewables. The United States has considerable hydroelectric potential beyond what is already being developed. Nearly 7 GW of this potential is found by adding capacity to existing hydropower facilities. To optimize the value of hydroelectric generation, the U.S. Department of Energy's Hydropower Vision Study highlights the importance of adding capacity to existing facilities. This report provides strategic approaches and considerations for Federal Energy Regulatory Commission licensed and exempt hydropower facilities seeking to increasemore » generation capacity, which may include increases from efficiency upgrades. The regulatory approaches reviewed for this report include capacity and non-capacity amendments, adding capacity during relicensing, and adding capacity when converting a license to a 10-MW exemption.« less
OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER ...
OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, OLD BYPASS IN BACKGROUND, VIEW TOWARDS SOUTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Will, Alan L.
1979-04-01
The redevelopment of the hydroelectric facility at Brighton Dam near Laurel, Maryland has been found to be both technically and financially feasible, the benefit to cost ratio being 1.53:1 compared with an equivalent coal-based generation source. Environmental impacts have been assessed as relatively slight, but some problems, due to poor water quality at the bottom of the reservoir are anticipated and solutions for these would have to be worked out. The benefit to cost ratio could thus be marginally decreased, but the relative costs of one alternative scheme compared to another would not be affected. There is no apparent impedimentmore » to proceeding with the work. The selected development would have a single hydroelectric generating unit of 500 kW rated capacity. The gross generation from the project would be 2,840,000 kWh in the year with average rainfall. It is estimated that the total project cost would be $734,000 (at third quarter 1978 price levels), with no allowance for funds during construction (AFDC). Based on 6.25% cost of money, the project would provide power at a levelized cost over the plant lifetime of approximately 23.3 mills per kWh with no AFDC or 24.6 mills/kWh with AFDC. At present, WSSC electrical power demands at Brighton Dam amount to 147,000 kWh per year which is met by Baltimore Gas and Electric Company (BG and E). This represents only 5% of the potential generation at the site and BG and E have agreed in principal to purchase the surplus power.« less
Big Creek Hydroelectric System, East & West Transmission Line, 241mile ...
Big Creek Hydroelectric System, East & West Transmission Line, 241-mile transmission corridor extending between the Big Creek Hydroelectric System in the Sierra National Forest in Fresno County and the Eagle Rock Substation in Los Angeles, California, Visalia, Tulare County, CA
Iakimova, L D
1997-01-01
The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.
View of steel flume (Irving intake system) that is covered ...
View of steel flume (Irving intake system) that is covered with old flume stock, flattened to protect from debris, animals and daylight, and is supported by wood trestles, as it continues downhill toward the Irving Powerhouse. Truck in photo provides scale. Looking north - Childs-Irving Hydroelectric Project, Irving System, Intake System, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
NASA Astrophysics Data System (ADS)
Johan, Kartina; Turan, Faiz Mohd
2017-08-01
Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.
Net Greenhouse Gas Emissions at the Eastmain 1 Reservoir, Quebec, Canada
NASA Astrophysics Data System (ADS)
Strachan, I. B.; Tremblay, A.; Bastien, J.; Bonneville, M.; Del Georgio, P.; Demarty, M.; Garneau, M.; Helie, J.; Pelletier, L.; Prairie, Y.; Roulet, N. T.; Teodoru, C. R.
2010-12-01
Canada has much potential to increase its already large use of hydroelectricity for energy production. However, hydroelectricity production in many cases requires the creation of reservoirs that inundate terrestrial ecosystems. While it has been reasonably well established that reservoirs emit GHGs, it has not been established what the net difference between the landscape scale exchange of GHGs would be before and after reservoir creation. Further, there is no indication of how that net difference may change over time from when the reservoir was first created to when it reaches a steady-state condition. A team of University and private sector researchers in partnership with Hydro-Québec has been studying net GHG emissions from the Eastmain 1 reservoir located in the boreal forest region of Québec, Canada. Net emissions are defined as those emitted following the creation of a reservoir minus those that would have been emitted or absorbed by the natural systems over a 100-year period in the absence of the reservoir. Sedimentation rates, emissions at the surface of the reservoir and natural water bodies, the degassing emissions downstream of the power house as well as the emissions/absorption of the natural ecosystems (forest, peatlands, lakes, streams and rivers) before and after the impoundment were measured using different techniques (Eddy covariance, floating chambers, automated systems, etc.). This project provides the first measurements of CO2 and CH4 between a new boreal reservoir and the atmosphere as the reservoir is being created, the development of the methodology to obtain these, and the first attempt at approaching the GHGs emissions from northern hydroelectric reservoirs as a land cover change issue. We will therefore provide: an estimate of the change in GHG source the atmosphere would see; an estimate of the net emissions that can be used for intercomparison of GHG contributions with other modes of power production; and a basis on which to develop biogeochemical sound, verifiable, and transparent estimates for GHG accounting. The results of the mass balance for this boreal reservoir from 2005 to 2009 as well as an extrapolation over 100 years will be presented.
OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND ...
OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND INTERIOR OF SOUTHWEST CORNER OF OLD BYPASS IN FOREGROUND, VIEW TOWARDS SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... Hydroelectric LLC, Lock Hydro Friends Fund XLV, FFP Project 2 LLC; Notice of Competing Preliminary Permit... (Riverbank) and Solia 3 Hydroelectric LLC (Solia) and on May 3, 2011, Lock Hydro Friends Fund XLV (Lock Hydro...
2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER ...
2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER TRANSFORMER BUILDING AND SERVICE SHED SEEN TO LEFT BELOW DIKE - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA
Cumulative impact assessment: A case study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irving, J.S.; Bain, M.B.
The National Environmental Policy Act of 1969 (NEPA) indirectly addressed cumulative impacts. Attempts to include cumulative impacts in environmental impact assessments, however, did not began until the early 1980's. One such effort began when The Federal Energy and Regulatory Commission (FERC) received over 1200 applications for hydroelectric projects in the Pacific Northwest. Federal and State Agencies, Indian tribes and environmental groups realized the potential cumulative effect such development could have on fish and wildfire resources. In response, the FERC developed the Cluster Impact Assessment Procedure (CIAP). The CIAP consisted of public scoping meetings; interactive workshops designed to identify projects withmore » potential for cumulative effects, important resources, available data; and preparation of a NEPA document (EA or EIS). The procedure was modifies to assess the cumulative impacts of fifteen hydroelectric projects in the Salmon River Basin, Idaho. The methodology achieved its basic objective of evaluating the impact of hydroelectric development on fish and wildfire resources. In addition, the use of evaluative techniques to determine project interactions and degrees of impact hindered acceptance of the conclusions. Notwithstanding these problems, the studies provided a basis for decision-makers to incorporate the potential effects of cumulative impacts into the decision-making process. 22 refs., 2 figs., 4 tabs.« less
Calder, Ryan S D; Schartup, Amina T; Li, Miling; Valberg, Amelia P; Balcom, Prentiss H; Sunderland, Elsie M
2016-12-06
Developing Canadian hydroelectric resources is a key component of North American plans for meeting future energy demands. Microbial production of the bioaccumulative neurotoxin methylmercury (MeHg) is stimulated in newly flooded soils by degradation of labile organic carbon and associated changes in geochemical conditions. We find all 22 Canadian hydroelectric facilities being considered for near-term development are located within 100 km of indigenous communities. For a facility in Labrador, Canada (Muskrat Falls) with planned completion in 2017, we probabilistically modeled peak MeHg enrichment relative to measured baseline conditions in the river to be impounded, downstream estuary, locally harvested fish, birds and seals, and three Inuit communities. Results show a projected 10-fold increase in riverine MeHg levels and a 2.6-fold increase in estuarine surface waters. MeHg concentrations in locally caught species increase 1.3 to 10-fold depending on time spent foraging in different environments. Mean Inuit MeHg exposure is forecasted to double following flooding and over half of the women of childbearing age and young children in the most northern community are projected to exceed the U.S. EPA's reference dose. Equal or greater aqueous MeHg concentrations relative to Muskrat Falls are forecasted for 11 sites across Canada, suggesting the need for mitigation measures prior to flooding.
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2013 CFR
2013-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2011 CFR
2011-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2012 CFR
2012-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2014 CFR
2014-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-21
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation of Teleconference On March 15... Mountain Pumped Storage Hydroelectric Project. This meeting has been cancelled. We will reschedule this...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-17
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells... of Energy Projects has reviewed the application for license for the Wells Hydroelectric Project (FERC...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-13
...) to provide the Commission with the responsibility of issuing licenses for non-federal hydroelectric... States public. Types of Respondents: Non-federal hydroelectric plants greater than 5 megawatt capacity (FERC-500); non-federal hydroelectric plants less than 5 megawatts capacity (FERC-505). Estimate of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 199-205] South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project On May 26 and...) and the South Carolina Public Service Authority (SCPSA), licensee for the Santee-Cooper Hydroelectric...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
...-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...., Bin 10221, Atlanta, GA 30308. Elizabeth Ann Brown, Deputy SHPO, Joey Charles, Georgia Power Alabama...
Study of hydraulic power recovery from New Mexico water distribution systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schoenmackers, R.
1984-02-01
The results of a survey of New Mexico water distribution systems suitable for hydroelectric power development are reported. The objectives of the survey were to determine the potential for hydraulic power recovery from existing and planned water systems, to identify potential sites, and to study and recommend promising sites for further development. The survey found eleven sites in New Mexico water distribution systems with a total hydroelectric power potential of 736 kilowatts. Seven of these sites, or 439 kilowatts, could be developed immediately, having everything necessary in place but the turbine generator. These sites are located in the Bonito pipelinemore » near Carrizozo (2 sites), Raton, Ruidoso, Santa Fe, Sugarite, and Taos. If all seven sites were developed, the annual energy production could reach 3,800,000 kilowatt hours.« less
Erlanger, Tobias E; Sayasone, Somphou; Krieger, Gary R; Kaul, Surinder; Sananikhom, Pany; Tanner, Marcel; Odermatt, Peter; Utzinger, Jurg
2008-06-01
Hydroelectric projects offer opportunities for infrastructure development and economic growth; yet, if not well designed, implemented and operated, they have the potential to negatively affect the health and well-being of local and distant downstream communities. Remote rural populations are particularly vulnerable to the sudden influx of men, materials and money, and associated population mixing that accompany project construction phases. Two large-scale baseline health surveys, carried out in 2001/2002 in two communities that were affected by the Nam Theun 2 hydroelectric project in central Lao PDR, were analysed. For the population to be resettled on the Nakai plateau it was observed that access to clean water and basic sanitation facilities was lacking. Faecal examinations revealed a high infection prevalence for Ascaris lumbricoides (67.7%), but relatively low prevalences for hookworm (9.7%), Taenia spp. (4.8%), Enterobius vermicularis (4.4%), Trichuris trichiura (3.9%), Strongyloides stercoralis (1.4%) and Opisthorchis viverrini (0.9%). For the population in the Xe Bang Fai downstream area, rapid diagnostic tests for malaria carried out in the rainy season found a prevalence below 1%, which might be explained by the complete coverage of households with insecticide-treated nets (99.8%). Anthropometric measurements in both populations suggest that wasting, stunting and underweight in under 5-year-old children were moderate to high; 15.9-17.5%, 40.4-55.7% and 35.8-55.7%, respectively. One out of six individuals aged above 14 years were malnourished, most likely as a result of early childhood wasting. Moderate anaemia, assessed by age- and sex-specific haemoglobin levels, was present in 43.8% (Nakai) and 54.9% of the individuals examined (Xe Bang Fai). Several indicators were extracted that can be utilised for monitoring changes in health, well-being and equity, as the project is implemented and operated.
(Short articles on energy conservation)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hodges, L.
1985-01-01
The following short articles are reprinted after being published in the Tri-County Times, Slater, Iowa, by Laurent Hodges of the Iowa State University Energy Extension Service: water power; small hydroelectric plants; condensation problems (three parts); energy quiz and answers; the airtight drywall approach; benefits of natural lighting; energy and Iowa's building code; heating, water heating and cooling costs in Iowa; the cost of keeping cool; and reducing the cost of keeping cool. (DLC)
Environmental impact assessment for alternative-energy power plants in México.
González-Avila, María E; Beltrán-Morales, Luis Felipe; Braker, Elizabeth; Ortega-Rubio, Alfredo
2006-07-01
Ten Environmental Impact Assessment Reports (EIAR) were reviewed for projects involving alternative power plants in Mexico developed during the last twelve years. Our analysis focused on the methods used to assess the impacts produced by hydroelectric and geothermal power projects. These methods used to assess impacts in EIARs ranged from the most simple, descriptive criteria, to quantitative models. These methods are not concordant with the level of the EIAR required by the environmental authority or even, with the kind of project developed. It is concluded that there is no correlation between the tools used to assess impacts and the assigned type of the EIAR. Because the methods to assess impacts produced by these power projects have not changed during 2000 years, we propose a quantitative method, based on ecological criteria and tools, to assess the impacts produced by hydroelectric and geothermal plants, according to the specific characteristics of the project. The proposed method is supported by environmental norms, and can assist environmental authorities in assigning the correct level and tools to be applied to hydroelectric and geothermal projects. The proposed method can be adapted to other production activities in Mexico and to other countries.
75 FR 66748 - City of Kaukauna, WI; Notice of Authorization for Continued Project Operation
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
... City of Kaukauna, Wisconsin, licensee for the Badger-Rapide Croche Hydroelectric Project, filed an... thereunder. The Badger-Rapide Croche Hydroelectric Project is on the Fox River in Outagamie County, near the... operation of the Badger-Rapide Croche Hydroelectric Project, until such time as the Commission acts on its...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and Western Minnesota Municipal Power Agency (transferee) filed an application for transfer of license for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... issued September 21, 1988,\\2\\ has been transferred to New Hampshire Hydro Associates. The project is...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC... feet National Geodetic Vertical Datum; (2) a dam comprised of (a) a 126- foot-wide, 13-foot-high...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-09
... Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River in Lewis and Clark and Teton...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000; 14268-000; 14277-000; 14281-000] Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC... Friends Fund XVIII (Lock Hydro), Upper Hydroelectric LLC (Upper Hydro), Riverbank Hydro No. 25 LLC...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower... Hydropower, Inc. and Eldred L Field Hydroelectric Facility Trust. e. Name of Project: Lowell Hydroelectric... Affairs Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-09
... Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2013, Sutton Hydroelectric Company, LLC filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... feasibility of the George W. Andrews Hydroelectric Project located at the existing George W. Andrews Lock and.... Andrews Lock and Dam Hydroelectric Project by Brookfield Power (Project No. 13077-000, filed on November... have an average annual generation of 89 gigawatt-hours. The proposed George W. Andrews Hydroelectric...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... Amendment of License. b. Project No.: 11313-019. c. Date Filed: March 31, 2010. d. Applicant: White Mountain Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11313-019] White Mountain...
NASA Astrophysics Data System (ADS)
Snover, A. K.; Littell, J. S.; Mantua, N. J.; Salathe, E. P.; Hamlet, A. F.; McGuire Elsner, M.; Tohver, I.; Lee, S.
2010-12-01
Assessing and planning for the impacts of climate change require regionally-specific information. Information is required not only about projected changes in climate but also the resultant changes in natural and human systems at the temporal and spatial scales of management and decision making. Therefore, climate impacts assessment typically results in a series of analyses, in which relatively coarse-resolution global climate model projections of changes in regional climate are downscaled to provide appropriate input to local impacts models. This talk will describe recent examples in which coarse-resolution (~150 to 300km) GCM output was “translated” into information requested by decision makers at relatively small (watershed) and large (multi-state) scales using regional climate modeling, statistical downscaling, hydrologic modeling, and sector-specific impacts modeling. Projected changes in local air temperature, precipitation, streamflow, and stream temperature were developed to support Seattle City Light’s assessment of climate change impacts on hydroelectric operations, future electricity load, and resident fish populations. A state-wide assessment of climate impacts on eight sectors (agriculture, coasts, energy, forests, human health, hydrology and water resources, salmon, and urban stormwater infrastructure) was developed for Washington State to aid adaptation planning. Hydro-climate change scenarios for approximately 300 streamflow locations in the Columbia River basin and selected coastal drainages west of the Cascades were developed in partnership with major water management agencies in the Pacific Northwest to allow planners to consider how hydrologic changes may affect management objectives. Treatment of uncertainty in these assessments included: using “bracketing” scenarios to describe a range of impacts, using ensemble averages to characterize the central estimate of future conditions (given an emissions scenario), and explicitly assessing the impacts of multiple GCM ensemble members. The implications of various approaches to dealing with uncertainty, such as these, must be carefully communicated to decision makers in order for projected climate impacts to be viewed as credible and used appropriately.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1976-09-01
Energy is a key element in the country's development; energy for industry, mining and mineral processing, transport, and the affluent society of the industrial southeast. Brazil's great strength is in water power and here lies a dilemma: most of the remaining hydroelectric potential is in the wrong place far from the major load centers. There is coal in the south, of relatively poor quality and worked on a scale far short of that of hydroelectric energy supply. The search for oil off the coast has not fulfilled the promise of early discoveries; and the extent of uranium reserves as amore » whole has yet to be determined. Brazil has extensive deposits of such important industrial raw materials as iron ore, bauxite, and manganese. With primary energy demand doubling every ten years, researchers are investigating the possibility of utilizing Brazil's tropical climate to grow crops specifically for fuel or converting them into charcoal or liquid fuels. The first nuclear plant in Brazil will not be in operation until late 1978 -- a600-MWe Westinghouse PWR at Angra dos Reis. Hydro energy represented 92 percent of total electricity supply in 1975. Nuclear was adopted as a back-up to provide a thermal component; presently, it is cheaper than other fossil-fueled base load capacity. The specific subjects described in detail are the construction of the world's largest power plant at Itaipu; power transmission into Sao Paulo; the buildup of Brazil's industrial capacity; the Amazon dilemma dealing with its almost insurmountable development; and the expanding power center at Paulo Afonso. (MCW)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-20
... Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption 1. By letter filed October 15, 2013, Jonathan Chase informed the Commission that the exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December 2, 2011,\\1\\ has been transferred to Troy Mills...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
... Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... of the Meeting: Commission staff will meet with the staff of the Bureau of Land Management to improve... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...
7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO ...
7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO THE LEFT, NORTH ELEVATION OF OFFICE BUILDING TO THE RIGHT, VIEW TO THE EAST. CONCRETE 'PATH' IN FOREGROUND IS THE CONDUIT THROUGH WHICH POWER CABLES RUN FROM THE TRANSFORMERS TO THE 115 KV SUBSTATION. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO
Code of Federal Regulations, 2010 CFR
2010-07-01
... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... Supply Creek Hydroelectric Project. f. Location: The proposed Water Supply Creek Hydroelectric Project will be located on Water Supply Creek, near the town of Hoonah on Chichagof Island, Alaska, affecting T... proposed run-of-river Water Supply Creek Hydroelectric Project will consist of: (1) A proposed 8-foot- high...
Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.
Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A
2015-04-01
Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.
A model for the data extrapolation of greenhouse gas emissions in the Brazilian hydroelectric system
NASA Astrophysics Data System (ADS)
Pinguelli Rosa, Luiz; Aurélio dos Santos, Marco; Gesteira, Claudio; Elias Xavier, Adilson
2016-06-01
Hydropower reservoirs are artificial water systems and comprise a small proportion of the Earth’s continental territory. However, they play an important role in the aquatic biogeochemistry and may affect the environment negatively. Since the 90s, as a result of research on organic matter decay in manmade flooded areas, some reports have associated greenhouse gas emissions with dam construction. Pioneering work carried out in the early period challenged the view that hydroelectric plants generate completely clean energy. Those estimates suggested that GHG emissions into the atmosphere from some hydroelectric dams may be significant when measured per unit of energy generated and should be compared to GHG emissions from fossil fuels used for power generation. The contribution to global warming of greenhouse gases emitted by hydropower reservoirs is currently the subject of various international discussions and debates. One of the most controversial issues is the extrapolation of data from different sites. In this study, the extrapolation from a site sample where measurements were made to the complete set of 251 reservoirs in Brazil, comprising a total flooded area of 32 485 square kilometers, was derived from the theory of self-organized criticality. We employed a power law for its statistical representation. The present article reviews the data generated at that time in order to demonstrate how, with the help of mathematical tools, we can extrapolate values from one reservoir to another without compromising the reliability of the results.
NASA Astrophysics Data System (ADS)
Hogeboom, Rick J.; Knook, Luuk; Hoekstra, Arjen Y.
2018-03-01
For centuries, humans have resorted to building dams to gain control over freshwater available for human consumption. Although dams and their reservoirs have made many important contributions to human development, they receive negative attention as well, because of the large amounts of water they can consume through evaporation. We estimate the blue water footprint of the world's artificial reservoirs and attribute it to the purposes hydroelectricity generation, irrigation water supply, residential and industrial water supply, flood protection, fishing and recreation, based on their economic value. We estimate that economic benefits from 2235 reservoirs included in this study amount to 265 × 109 US a year, with residential and industrial water supply and hydroelectricity generation as major contributors. The water footprint associated with these benefits is the sum of the water footprint of dam construction (<1% contribution) and evaporation from the reservoir's surface area, and globally adds up to 66 × 109 m3 y-1. The largest share of this water footprint (57%) is located in non-water scarce basins and only 1% in year-round scarce basins. The primary purposes of a reservoir change with increasing water scarcity, from mainly hydroelectricity generation in non-scarce basins, to residential and industrial water supply, irrigation water supply and flood control in scarcer areas.
NASA Astrophysics Data System (ADS)
Himawanto, Dwi Aries; Tjahjana, D. D. D. P.; Hantarum
2017-01-01
Pump as turbine or PAT is an application that promises to produce small-scale electric power supply. Compared to conventional turbines, pumps have low prices and available in the market with various sizes. Therefore, PAT is suitable for hydroelectric power generation for rural areas in Indonesian. The study emphasizes experiments aimed to find the best operating point of the pump as the turbine by modifying the curvature of the pump blade. A pump with a capacity of 563.22 liters / min and a total head of 20 meters was tested in the laboratory with a radius of curvature of the blade is modified Radius 11 (backward), 13 (backward), 15 (backward), Radial, 11 (forward), 13 (forward), 15 (forward) centimeter with head from 2, 3, 4 meters and connected to a generator. The results showed that the best is 31.39% efficiency at 4.2 liters / sec and the rotation of the turbine shaft 870 rpm at the head of 4 meters. Maximum power output is 90 watts which are enough to generate electricity for a small house. The experimental results showed good results theoretically. Suggested for further modifications by using the same pump, expected better results to achieve the best efficiency point of PAT.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-27
.... Name of Project: Hawks Nest Hydroelectric Project (P-2512-069) and Glen Ferris Hydroelectric Project (P... of Gauley Bridge, and Glen Ferris Hydroelectric Project is on the Kanawha River in the vicinity of the Town of Glen Ferris, both within Fayette County, West Virginia. The projects do not affect federal...
NASA Astrophysics Data System (ADS)
Wong-Parodi, G.; Babcock, M.; Small, M.; Grossmann, I.
2014-12-01
Climate change is expected to increase the chances of drought, and shift precipitation patterns in seasonally dry places. In some places, the heuristics or "rules of thumb" that stakeholders use may no longer be reliable for the effective management of water resources. This can have dire consequences for social and ecological systems, especially in developing countries. Scientists and policymakers view climate forecasts as one way for improving informed decision-making about freshwater resources. However, successful communication requires that stakeholders understand and are able to use such information. To develop effective communications, it is critical to characterize stakeholders' understanding of social-ecological systems as related to water, the type of information used to inform management decisions, and the perceived value of forecast information. To achieve our objective, we conducted 40 semi-structured interviews with farmers, water managers, hydroelectric utilities, local climate experts, tourism industry representatives, and members of the general public in the semi-arid region of Guanacaste, Costa Rica. People believe that they have enough water at this time however they believe that the region will become much drier in the future, which they attribute to climate change, El Nino/La Nina, and deforestation. With respect to the value of forecast information, we found that the scale of decision-making (e.g., irrigation district versus small farmer) was associated with a stakeholders' level of "technical sophistication" and trust in government. In future work, we will evaluate the prevalence of these beliefs and practices in the larger population in order to identify effective ways to tailor the presentation of forecast information for different audiences. This work provides insight into the development of forecast communications to improve the management of resources in development countries in the face of a changing climate.
Benchmarking of Advanced Control Strategies for a Simulated Hydroelectric System
NASA Astrophysics Data System (ADS)
Finotti, S.; Simani, S.; Alvisi, S.; Venturini, M.
2017-01-01
This paper analyses and develops the design of advanced control strategies for a typical hydroelectric plant during unsteady conditions, performed in the Matlab and Simulink environments. The hydraulic system consists of a high water head and a long penstock with upstream and downstream surge tanks, and is equipped with a Francis turbine. The nonlinear characteristics of hydraulic turbine and the inelastic water hammer effects were considered to calculate and simulate the hydraulic transients. With reference to the control solutions addressed in this work, the proposed methodologies rely on data-driven and model-based approaches applied to the system under monitoring. Extensive simulations and comparisons serve to determine the best solution for the development of the most effective, robust and reliable control tool when applied to the considered hydraulic system.
NASA Astrophysics Data System (ADS)
Delorme, Rolland
The generation of electrical energy in Quebec, estimated to 200 TWh, comes from hydroelectric generating stations for 96 % which are at the heart of provincial ecological and economic challenges. An important amount of research has been devoted to improving the hydrodynamic profile of hydraulic turbines to maximize their energy efficiency. However, few studies have focused on the draft tube in hydroelectric power plants, which is the duct where water flows out after crossing the turbine. Recent calculations performed by Alstom Power & Transport Canada Inc. revealed that the shape modulation of the draft tube could increase the hydroelectric generating station performance. The goal of this research was to assess the feasibility of this shape modification in existing draft tubes with inflatable composite membranes. The study consisted first of building an experimental setup to test the inflation of at membranes made up of a fiberglass-reinforced rubber composite. The inflated membranes were digitized with an optical equipment enabling 3D representations of their deflections. The second part of the study aimed at building finite element models reproducing the same experiments and enabling the design of more complicated membranes. The study confirmed the technical feasibility of designing and manufacturing such a membrane for the targeted application. However the large-scale roll-out will require to manufacture 3D membranes with the proper anchoring system. Keywords: reinforced rubber composite, reinforced elastomer composite, textile reinforcement, finite element modeling, mechanical behavior.
Yakama Nation Renewable Energy Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigdon, Phillip
2016-05-10
It is the intention of the Yakama Nation to make improvements on the Wapato Irrigation Project (WIP) for the benefit of all stakeholders. Water management, water conservation and water allocation on the Wapato Irrigation Project is equally as important as hydropower. Irrigation will always be the primary purpose of this water system, but the irrigation system can also generate energy. The purpose of this project is the purchase and installation of inflow water turbines to generate an additional one megawatt of hydro-electrical power. The project will occur in two phases, Environmental Assessment and Project Implementation. The core objective for thismore » proposal is to meet the Yakama Nation’s goal in hydroelectric power development. This will include the installation of inflow water turbines on the Wapato Irrigation Project. The Yakama Nation will prepare an Environmental Assessment in preparation to purchase and install new water turbines for hydropower generation of 1 Megawatt. This is a valuable economic development strategy for Yakama Nation that will create new jobs, improve and increase rural electrification, and attract private investments. This water system has an untapped low head/low power potential without the need to construct a new dam. The objective of Phase 1 is to complete an environmental assessment and obtain approval to proceed with installation of the hydroelectric power system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ledec, G.
1992-01-01
Panama's rapid deforestation for cattle pasture is causing serious environmental problems, as well as negative economic and social consequences. Bank credit encourages deforestation by making cattle pasture expansion more affordable, more profitable, or less risky. Two governmental banks in Panama supply most of the institutional credit provided to small- and medium-scale ranchers, through loans from the Inter-American Development Bank and World Bank. Panama's large-scale ranchers obtain credit mostly from private commercial banks at subsidized interest rates. This study estimates that at least 7-10 percent of Panama's annual deforestation is due to governmental bank cattle credit. Cattle credit is more importantmore » in the loss of remaining forest fragments in long-settled areas than in forest-to-pasture conversion in frontier areas. However, because of the high environmental value of these forest remnants, their credit-induced loss is a serious public policy problem. Other incentives for cattle pasture expansion include beef markets, securing land claims, land price speculation, tax advantages, and the prestige value of cattle ranching. With care, the findings from this study can be generalized to many other tropical Latin American countries. Options available for minimizing deforestation include prohibiting or reducing institutional credit to cattle ranchers, restricting cattle credit to areas where little or no potential exists for additional deforestation, and eliminating interest rate subsidies on cattle credit. Such credit policy reforms would also improve economic efficiency and income distribution. other policy variables also influence Panama's deforestation rate: road construction and improvement, establishment and enforcement of protected areas, land titling laws and procedures, taxes, commercial forestry policies, beef pricing and export policies, the siting of hydroelectric projects, and policies that promote alternative employment for forest settlers.« less
2016-01-01
The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon—Salmo salar, number of >1 year old Atlantic salmon, number of brown trout—Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies. PMID:27191717
Bilotta, Gary S; Burnside, Niall G; Gray, Jeremy C; Orr, Harriet G
2016-01-01
The potential environmental impacts of large-scale storage hydroelectric power (HEP) schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR) schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout). The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.
National Hydroelectric Power Resources Study:Regional Assessment: Volume XXIII: Alaska and Hawaii
1981-09-01
amount of recoverable geothermal energy is still unknown, a test well (HGP-A) was drilled 6,450 feet into the eastern rift of Kilauea volcano on...US Army Corps of Engineers National Hydroelectric Power Resources Study Volume XXIII September 1 981 Regional Assessment: Alaska and Hawaii ...National Hydroelectric Power Resources Study: Final Regional Assessment; Alaska and Hawaii IS. PERFORMING ORG. REPORT NUMBER IWR 82--23 7. AUTHOR(a) 8
NASA Astrophysics Data System (ADS)
Posey, C. J.
During times when overshot and undershot water wheels provided power for turning millstones, much depended upon the miller's judgment. “A big order is coming in tomorrow. Better shut down this afternoon. The trash rack needs to be cleaned and the flash boards raised.” Common sense could solve most of the problems in those days. It had to, if business was to continue.As the industrial revolution progressed, generation of electricity became a possibility. Higher rotational speeds than could be obtained by belts, pulleys, or gears were needed. Ingenious though the miller might have been, he had to depend on engineers who understood electricity and high-velocity flow to mate water wheels to dynamos. Enough engineers did, and by making tests of a variety of designs, often with small-scale runners, were able to guarantee the efficiency of hydroelectric generators suitable for a variety of sites. The miller was thus relieved of the “high-tech” decision. Now all important decisions fall to his successors, the utility companies, with assistance(?) from the State Utilities Boards and the National Securities and Exchange Commission.
5. CONTEXTUAL VIEW OF THE VILLAGE COMPLEX, SHOWING COTTAGES 10, ...
5. CONTEXTUAL VIEW OF THE VILLAGE COMPLEX, SHOWING COTTAGES 10, 9, 8, 7, LOOKING NORTHWEST - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
6. CONTEXTUAL VIEW OF THE VILLAGE COMPLEX, SHOWING COTTAGES 6, ...
6. CONTEXTUAL VIEW OF THE VILLAGE COMPLEX, SHOWING COTTAGES 6, 7, 8, 9, LOOKING NORTHEAST - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
6. VIEW OF SWITCH ROOM, POWERHOUSE, SHOWING TRANSFORMER CABLE PORTAL ...
6. VIEW OF SWITCH ROOM, POWERHOUSE, SHOWING TRANSFORMER CABLE PORTAL BAY, LOOKING SOUTH - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
2. VIEW OF MECHANICAL GATE LIFTING MECHANISM (MULE) AND GATE ...
2. VIEW OF MECHANICAL GATE LIFTING MECHANISM (MULE) AND GATE LIFTING RACKS, LOOKING WEST - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
3. VIEW OF MECHANICAL GATE LIFTING MECHANISM (MULE) AND GATE ...
3. VIEW OF MECHANICAL GATE LIFTING MECHANISM (MULE) AND GATE RACKS, LOOKING EAST - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
4. DETAIL VIEW OF LIFTING GEAR ON MULE AND RACK ...
4. DETAIL VIEW OF LIFTING GEAR ON MULE AND RACK ATTACHMENT BOOKS, LOOKING EAST - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
Ultra-low-head hydroelectric technology: A review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Daqing; Deng, Zhiqun
In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the currentmore » achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.« less
Macedo, Diego R; Hughes, Robert M; Kaufmann, Philip R; Callisto, Marcos
2018-04-23
Augmented production and transport of fine sediments resulting from increased human activities are major threats to freshwater ecosystems, including reservoirs and their ecosystem services. To support large scale assessment of the likelihood of soil erosion and reservoir sedimentation, we developed and validated an environmental fragility index (EFI) for the Brazilian neotropical savannah. The EFI was derived from measured geoclimatic controls on sediment production (rainfall, variation of elevation and slope, geology) and anthropogenic pressures (natural cover, road density, distance from roads and urban centers) in 111 catchments upstream of four large hydroelectric reservoirs. We evaluated the effectiveness of the EFI by regressing it against a relative bed stability index (LRBS) that assesses the degree to which stream sites draining into the reservoirs are affected by excess fine sediments. We developed the EFI on 111 of these sites and validated our model on the remaining 37 independent sites. We also compared the effectiveness of the EFI in predicting LRBS with that of a multiple linear regression model (via best-subset procedure) using 7 independent variables. The EFI was significantly correlated with the LRBS, with regression R 2 values of 0.32 and 0.40, respectively, in development and validation sites. Although the EFI and multiple regression explained similar amounts of variability (R 2 = 0.32 vs 0.36), the EFI had a higher F-ratio (51.6 vs 8.5) and better AICc value (333 vs 338). Because the sites were randomly selected and well-distributed across geoclimatic controlling factors, we were able to calculate spatially-explicit EFI values for all hydrologic units within the study area (~38,500 km 2 ). This model-based inference showed that over 65% of those units had high or extreme fragility. This methodology has great potential for application in the management, recovery, and preservation of hydroelectric reservoirs and streams in tropical river basins. Copyright © 2018 Elsevier B.V. All rights reserved.
1986-04-01
Chapel Hill. Oosting, H.J. 1942 An Ecological Analysis of the Plant Communities of Piedmont North Carolina. The American Midland Naturalist 28:1-126...sites and 3 sites were recommeded for furthework. / ,. ’-’ / .!A I 17. Document Analysis a. Descriptors i b. Identifior/Open-Ended Terms I Archeology...maintained at USRB is a Woodland community pattern of small satellite sites clustering near the large sites, and the ceramic analysis reported here suggests
ERIC Educational Resources Information Center
Vaughan, Gary L.
This manual is designed to assist management consultants in working with small-scale entrepreneurs in developing countries. Addressed in an overview of the small-scale enterprise (SSE) are: the role of the SSE in third world development, problems of SSEs, and target firms. The second chapter deals with various forms of management assistance to…
8. VIEW OF GANTRY ROOM, POWERHOUSE, SHOWING 25TON WHITING MOVABLE ...
8. VIEW OF GANTRY ROOM, POWERHOUSE, SHOWING 25-TON WHITING MOVABLE CRANE AND BRIDGE - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
9. ELEVATION AND SECTION, OPERATOR'S COTTAGE NO. 3 Blueprint drawing ...
9. ELEVATION AND SECTION, OPERATOR'S COTTAGE NO. 3 Blueprint drawing no. D 3366 - Nine Mile Hydroelectric Development, Cottage No. 1, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
7. INTERIOR VIEW OF COTTAGE NO. 1, SHOWING KITCHEN AND ...
7. INTERIOR VIEW OF COTTAGE NO. 1, SHOWING KITCHEN AND EATING NOOK, LOOKING WEST - Nine Mile Hydroelectric Development, Cottage No. 1, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
14. DETAILS OF GATE OPERATING MECHANISM, SHOWING RACK SECTION, CUT ...
14. DETAILS OF GATE OPERATING MECHANISM, SHOWING RACK SECTION, CUT TEETH, CAST TEETH, GATE PINION (1907) - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING ...
11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING GRAVITY LUBRICATING OIL BOX ABOVE GENERATOR - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
Hallwass, Gustavo; Lopes, Priscila F; Juras, Anastácio A; Silvano, Renato A M
2013-03-01
The long-term impacts of large hydroelectric dams on small-scale fisheries in tropical rivers are poorly known. A promising way to investigate such impacts is to compare and integrate the local ecological knowledge (LEK) of resource users with biological data for the same region. We analyzed the accuracy of fishers' LEK to investigate fisheries dynamics and environmental changes in the Lower Tocantins River (Brazilian Amazon) downstream from a large dam. We estimated fishers' LEK through interviews with 300 fishers in nine villages and collected data on 601 fish landings in five of these villages, 22 years after the dam's establishment (2006-2008). We compared these two databases with each other and with data on fish landings from before the dam's establishment (1981) gathered from the literature. The data obtained based on the fishers' LEK (interviews) and from fisheries agreed regarding the primary fish species caught, the most commonly used type of fishing gear (gill nets) and even the most often used gill net mesh sizes but disagreed regarding seasonal fish abundance. According to the interviewed fishers, the primary environmental changes that occurred after the impoundment were an overall decrease in fish abundance, an increase in the abundance of some fish species and, possibly, the local extinction of a commercial fish species (Semaprochilodus brama). These changes were corroborated by comparing fish landings sampled before and 22 years after the impoundment, which indicated changes in the composition of fish landings and a decrease in the total annual fish production. Our results reinforce the hypothesis that large dams may adversely affect small-scale fisheries downstream and establish a feasible approach for applying fishers' LEK to fisheries management, especially in regions with a low research capacity.
NASA Astrophysics Data System (ADS)
Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.
2017-04-01
The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).
3. VIEW OF SPILLWAY DAM AND POWERHOUSE FOREGROUND, SHOWING NINE ...
3. VIEW OF SPILLWAY DAM AND POWERHOUSE FOREGROUND, SHOWING NINE MILE RESERVOIR IN LEFT BACKGROUND, LOOKING WEST - Nine Mile Hydroelectric Development, Dam, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
ERIC Educational Resources Information Center
Eaton, William W.
Reviewed are technological problems faced in energy production including locating, recovering, developing, storing, and distributing energy in clean, convenient, economical, and environmentally satisfactory manners. The energy resources of coal, oil, natural gas, hydroelectric power, nuclear energy, solar energy, geothermal energy, winds, tides,…
Cumulative impact assessment: Application of a methodology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witmer, G.W.; Bain, M.B.; Irving, J.S.
We expanded upon the Federal Energy Regulatory Commission's (FERC) Cluster Impact Assessment Procedure (CIAP) to provide a practical methodology for assessing potential cumulative impacts from multiple hydroelectric projects within a river basin. The objectives in designing the methodology were to allow the evaluation of a large number of combinations of proposed projects and to minimize constraints on the use of ecological knowledge for planning and regulating hydroelectric development at the river basin level. Interactive workshops and evaluative matrices were used to identify preferred development scenarios in the Snohomish (Washington) and Salmon (Idaho) River Basins. Although the methodology achieved its basicmore » objectives, some difficulties were encountered. These revolved around issues of (1) data quality and quantity, (2) alternatives analysis, (3) determination of project interactions, (4) determination of cumulative impact thresholds, and (5) the use of evaluative techniques to express degrees of impact. 8 refs., 1 fig., 2 tabs.« less
50 CFR 223.301 - Special rules-marine and anadromous fishes.
Code of Federal Regulations, 2013 CFR
2013-10-01
... their behalf for the purpose of monitoring and evaluating the Opal Springs Hydroelectric Project (FERC... maintenance of the Opal Springs Hydroelectric Project (FERC Project No. 5891) as administered under a license...
WHEELROOM (TURBINE ROOM), LOOKING WEST TOWARD PENSTOCK FOR #2 AND ...
WHEELROOM (TURBINE ROOM), LOOKING WEST TOWARD PENSTOCK FOR #2 AND #1 TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
INTERIOR DETAIL VIEW OF CASING FOR FRANCIS WATER WHEEL (TURBINE ...
INTERIOR DETAIL VIEW OF CASING FOR FRANCIS WATER WHEEL (TURBINE #2). PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Schork, G; Zaniboni-Filho, E
2017-11-01
The objective of this study was to evaluate the structure of the fish assemblage in the ten years following the closing of the lake of the Itá Hydroelectric Power Plant. Seasonal collections were conducted from 2001 to 2010. During this period, 44,834 fish were captured, totaling 3,818.01 kg, among 8 orders, 24 families and 84 species. In general, profound changes were not observed in the fish assemblage in the ten years after the formation of the Itá lake. Few species changed in dominance over time, while many were rare in the environment. The ichthyofauna in the reservoir was dominated by small and medium size opportunist species that conduct short or no migratory movements. Among the most abundant, six species were responsible for more than 50% of the numeric representation: Steindachnerina brevipinna, Astyanax fasciatus, Apareiodon affinis, Hypostomus isbrueckeri, Iheringichthys labrosus and Loricariichthys anus. The increase in the representation of the later species stood out. The biomass was dominated by Steindachneridion scriptum, Prochilodus lineatus, I. laborsus, Schizodon nasutus, Hoplias malabaricus, Acestrorhynchus pantaneiro, Hoplias lacerdae, H. isbrueckeri and L. anus. Despite the presence of large migrators in the region of the reservoir, their vulnerability was revealed by the low numeric abundance and accidental capture. The k-dominance curve of numerical abundance and biomass indicates a moderately disturbed community, in which the representation of small species was also important to the amounts of biomass.
3. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...
3. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT
1. SWIMMING POOL. VIEW TO WEST. Rainbow Hydroelectric Facility, ...
1. SWIMMING POOL. VIEW TO WEST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT
2. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...
2. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT
Recovery Act. Tapoco project. Cheoah upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tran, Paul
2013-10-02
Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.
Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.
ERIC Educational Resources Information Center
Jacobs, Linda
This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…
Pestana, I A; Bastos, W R; Almeida, M G; de Carvalho, D P; Rezende, C E; Souza, C M M
2016-05-01
Damming rivers to construct hydroelectric reservoirs results in a series of impacts on the biogeochemical Hg cycle. For example, modifying the hydrodynamics of a natural watercourse can result in the suspension and transport of Hg deposits in the water column, which represents an exposure risk for biota. The objective of this study was to evaluate the influences of seasonality on the dispersion of total Hg in the Hydroelectric Power Plant (HPP)-Samuel Reservoir (Porto Velho/Brazil). Sampling campaigns were performed during the three following hydrological periods characteristic of the region: low (Oct/2011), ebbing (May/2012), and high (Feb/2013) water. Sediment profiles, suspended particulate matter (SPM), and aquatic macrophytes (Eicchornia crassipes and Oryza spp.) were collected, and their Hg concentrations and isotopic and elemental C and N signatures were determined. The drainage basin significantly influenced the SPM compositions during all the periods, with a small autochthonous influence from the reservoir during the low water. The highest SPM Hg concentrations inside the reservoir were observed during the high water period, suggesting that the hydrodynamics of this environment favor the suspension of fine SPM, which has a higher Hg adsorption capacity. The Hg concentrations in the sediment profiles were ten times lower than those in the SPM, indicating that large particles with low Hg concentrations were deposited to form the bottom sediment. Hg concentrations were higher in aquatic macrophyte roots than in their leaves and appeared to contribute to the formation of SPM during the low water period. In this environment, Hg transport mainly occurs in SPM from the Jamari River drainage basin, which is the primary source of Hg in this environment.
3. LOCATION OF OPERATORS' COTTAGES AND GARAGE DETAILS, NINE MILE ...
3. LOCATION OF OPERATORS' COTTAGES AND GARAGE DETAILS, NINE MILE STATION. Blueprint drawing no. D3252, dated July 21, 1927 - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
6. DETAIL VIEW OF FRONT ENTRY DOORWAY, LIVING ROOM, COTTAGE ...
6. DETAIL VIEW OF FRONT ENTRY DOORWAY, LIVING ROOM, COTTAGE NO. 1, SHOWING FANLIGHT AND ORIGINAL LIGHT FIXTURE - Nine Mile Hydroelectric Development, Cottage No. 1, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
10. VIEW OF GENERATING ROOM, POWERHOUSE, SHOWING ORIGINAL GENERATORS NOS. ...
10. VIEW OF GENERATING ROOM, POWERHOUSE, SHOWING ORIGINAL GENERATORS NOS. 1 THROUGH 4, WITH NO. 4 GENERATOR IN FOREGROUND - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
DETAIL INTERIOR VIEW OF ELECTRIC GENERATOR ON UPPER LEVEL ON ...
DETAIL INTERIOR VIEW OF ELECTRIC GENERATOR ON UPPER LEVEL ON HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Canton hydroelectric project: feasibility study. Final report, appendices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-05-01
These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...
Hiilangaay Hydroelectric Project – Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Twitchell, Sara; Stimac, Michael; Lang, Lisa
2016-06-01
The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
... Acquisition and Easements, Hydraulics and Hydrology, Water Rights, Project Features and Design, Power... Federal water resource projects, Reclamation will consider proposals for non-Federal development of... part of the Klamath Project, the United States constructed A, B, and C-Canals, which carry water south...
Anderson, Elizabeth P.; Freeman, Mary C.; Pringle, C.M.
2006-01-01
Small dams for hydropower have caused widespread alteration of Central American rivers, yet much of recent development has gone undocumented by scientists and conservationists. We examined the ecological effects of a small hydropower plant (Dona Julia Hydroelectric Center) on two low-order streams (the Puerto Viejo River and Quebradon stream) draining a mountainous area of Costa Rica. Operation of the Dona Julia plant has dewatered these streams, reducing discharge to ~ 10% of average annual flow. This study compared fish assemblage composition and aquatic habitat upstream and downstream of diversion dams on two streams and along a ~ 4 km dewatered reach of the Puerto Viejo River in an attempt to evaluate current instream flow recommendations for regulated Costa Rican streams. Our results indicated that fish assemblages directly upstream and downstream of the dam on the third order Puerto Viejo River were dissimilar, suggesting that the small dam (< 15 in high) hindered movement of fishes. Along the ~ 4 km dewatered reach of the Puerto Viejo River, species count increased with downstream distance from the dam. However, estimated species richness and overall fish abundance were not significantly correlated with downstream distance from the dam. Our results suggested that effects of stream dewatering may be most pronounced for a subset of species with more complex reproductive requirements, classified as equilibrium-type species based on their life-history. In the absence of changes to current operations, we expect that fish assemblages in the Puerto Viejo River will be increasingly dominated by opportunistic-type, colonizing fish species. Operations of many other small hydropower plants in Costa Rica and other parts of Central America mirror those of Doha Julia; the methods and results of this study may be applicable to some of those projects.
Deer Creek Dam, Hydroelectric Powerplant, 868 feet/291 degrees from intersection ...
Deer Creek Dam, Hydroelectric Powerplant, 868 feet/291 degrees from intersection of dam complex access road with U.S. Highway 189, 1,340 feet/352 degrees from the dam spillway overpass, Charleston, Wasatch County, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-16
... Drum-Spaulding and Yuba-Bear Hydroelectric Projects On May 17, 2013, the Commission issued a Notice of Availability of the Draft Environmental Impact Statement for the Drum-Spaulding and Yuba-Bear Hydroelectric...
4. CONTEXTUAL VIEW OF THE VILLAGE COMPLEX, SHOWING COTTAGE NO. ...
4. CONTEXTUAL VIEW OF THE VILLAGE COMPLEX, SHOWING COTTAGE NO. 1 IN FOREGROUND, LOOKING SOUTH ALONG THE ENTRANCE DRIVEWAY (OLD CHARLES ROAD) - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
5. INTERIOR VIEW OF COTTAGE NO. 1, SHOWING LIVING ROOM ...
5. INTERIOR VIEW OF COTTAGE NO. 1, SHOWING LIVING ROOM WITH FIREPLACE AND FLANKING BUILT-IN BOOKSHELVES, LOOKING SOUTH - Nine Mile Hydroelectric Development, Cottage No. 1, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINEGENERATOR ...
12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINE-GENERATOR DRIVE SHAFT IN FOREGROUND, ACCESS BULKHEAD TO TURBINE IN BACKGROUND - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... comments filed. k. Description of Application: The licensee proposes to, in part, remove the Cisco Development from the Bond Falls Hydroelectric Project license. The Cisco Dam and its chain of lakes would be...
ERIC Educational Resources Information Center
Vaughan, Gary L.
Written in Spanish, this manual is designed to assist management consultants in working with small-scale entrepreneurs in developing countries. Addressed in an overview of the small-scale enterprise (SSE) are the role of the SSE in Third World development, problems of SSEs, and target firms. The second chapter deals with various forms of…
National Guard State Partnership Program: A Whole-of Government Approach
2010-03-01
be better able to take ownership of and solve crisis situations within their borders, provide necessities to their people through sound governance...lower level concentrated focus on a partner country (State vs . U.S. Government); executing mission spanning military, political, economic and...and hydroelectric development, foreign investment 22 reform and development, franchise opportunities, bio-fuels development, and public and
Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crew, James F.; Johnson, Herbie N.
2015-03-31
From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.
Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire
Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.
DETAIL OF WESTINGHOUSE AND B. MORGAN SMITH NAMEPLATES ON ELECTRIC ...
DETAIL OF WESTINGHOUSE AND B. MORGAN SMITH NAMEPLATES ON ELECTRIC GENERATOR IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Ergonomic evaluation of the environment: a case study in a control room of the hydroelectric sector.
Falcão, Christianne Soares; Soares, Marcelo Marcio
2012-01-01
Representative systematic evaluation studies of the workspace and the extent to which that space is suitable for performing tasks have been developed by professionals engaged on finding evidence as to the importance of users and designers being joint participants in drawing up projects. In this context, this paper sets out to evaluate the environment of a control room in the hydroelectric sector, based on a multidisciplinary method which integrates ergonomics, architecture and environmental psychology so as to assess the influence of space on the user, and thus to identify the user's level of satisfaction with it. It was observed that some adaptation strategies of the space for activities were not implemented satisfactorily, resulting in the need for further studies on making workspaces suitable.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-12-31
This legislation grants a 5 year waiver on the payment of fees for the use of lands for the operating and maintaining of a hydroelectric development licensed by the Federal Energy Regulatory Commission, to any political subdivision of the state of Montana which takes the license, for FERC project 1473. Following the 5 year period the licensee would be required to pay the lesser of $20,000 or the annual charge for the use of the land imposed by any department or agency of the Federal Government.
2. CONTEXTUAL VIEW OF THE NINE MILE HED, SHOWING DAM ...
2. CONTEXTUAL VIEW OF THE NINE MILE HED, SHOWING DAM AND POWERHOUSE IN FOREGROUND, AND COTTAGES NO. 1 AND 2 IN RIGHT BACKGROUND, LOOKING WEST - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
12. Sewage Ejector Pumps, view to the southwest. These pumps ...
12. Sewage Ejector Pumps, view to the southwest. These pumps are connected to sewage treatment tanks. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
4. REAR (NORTH) FACADE OF THE UPPER FALLS GATE HOUSE. ...
4. REAR (NORTH) FACADE OF THE UPPER FALLS GATE HOUSE. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
15. Potential Transformer for Unit 2 and Operating Floor Front ...
15. Potential Transformer for Unit 2 and Operating Floor Front Corridor, view to the east-southeast. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
ERIC Educational Resources Information Center
Vaughan, Gary L.
Written in French, this manual is designed to assist management consultants in working with small-scale entrepreneurs in developing countries. Addressed in an overview of the small-scale enterprise (SSE) are the role of the SSE in Third World development, problems of SSEs, and target firms. The second chapter deals with various forms of management…
GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSEWOODWARD WATERWHEEL GOVERNOR TYPE ...
GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSE--WOODWARD WATERWHEEL GOVERNOR TYPE HR: 21,500 LBS OF THRUST, SIZE 11 BORE & STROKE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Local Economic Development and Hydropower Along the Brahmaputra River Basin in Northeast India
NASA Astrophysics Data System (ADS)
Mock, A.
2014-12-01
Large dams have long been controversial. They offer benefits, such as reduced greenhouse gas emissions, energy security, and local development, yet produce negative social and ecological impact, such as wildlife habitat destruction, human displacement, and the disruption of downstream fishing or agricultural industries. In the past decade, the Indian government has signed Memoranda of Understanding with hydroelectric power companies for the building of over 130 large dams on the Brahmaputra River in the state of Arunachal Pradesh in Northeast India. These dams can generate 43% of India's assessed hydropower potential to sustain India's growing economy. In addition, the Indian government claims that these dams will bring local development with needed jobs. However, local Arunachali people have protested and temporarily halted hydropower projects because of the impact of dams on their existing livelihoods. Using the North Eastern Electric Power Corporation's (NEEPCO) Ranganadi Hydroelectric Project as a case study, our project examined whether dams in Northeast India provide jobs for local people, and whether distance from the dam or work colony to a worker's hometown affects the type of job the worker received. Survey data from residents at NEEPCO's work colony in Doimukh, Arunachal Pradesh, was analyzed using SPSS (n = 18). Our research found that 100% of workers at the dam originally resided in Northeast India, with 33% from Arunachal Pradesh, and 67% from the nearby states of Assam, and Tripura. Further, our analysis revealed no statistically significant relationship between the distance to a worker's hometown and job type (p = .609). Where workers come from did not affect the type of job they received. More research using a larger sample size and additional hydroelectric project case studies is needed to further explore the relationship between worker home location and their job types.
The invisibility of fisheries in the process of hydropower development across the Amazon.
Doria, Carolina Rodrigues da Costa; Athayde, Simone; Marques, Elineide E; Lima, Maria Alice Leite; Dutka-Gianelli, Jynessa; Ruffino, Mauro Luis; Kaplan, David; Freitas, Carlos E C; Isaac, Victoria N
2018-05-01
We analyze the invisibility of fisheries and inadequacy of fishers' participation in the process of hydropower development in the Amazon, focusing on gaps between legally mandated and actual outcomes. Using Ostrom's institutional design principles for assessing common-pool resource management, we selected five case studies from Brazilian Amazonian watersheds to conduct an exploratory comparative case-study analysis. We identify similar problems across basins, including deficiencies in the dam licensing process; critical data gaps; inadequate stakeholder participation; violation of human rights; neglect of fishers' knowledge; lack of organization and representation by fishers' groups; and lack of governmental structure and capacity to manage dam construction activities or support fishers after dam construction. Fishers have generally been marginalized or excluded from decision-making regarding planning, construction, mitigation, compensation, and monitoring of the social-ecological impacts of hydroelectric dams. Addressing these deficiencies will require concerted investments and efforts by dam developers, government agencies and civil society, and the promotion of inter-sectorial dialogue and cross-scale participatory planning and decision-making that includes fishers and their associations.
Cada, Glenn; Loar, James; Garrison, Laura; Fisher, Richard; Neitzel, Duane
2006-06-01
Severe fluid forces are believed to be a source of injury and mortality to fish that pass through hydroelectric turbines. A process is described by which laboratory bioassays, computational fluid dynamics models, and field studies can be integrated to evaluate the significance of fluid shear stresses that occur in a turbine. Areas containing potentially lethal shear stresses were identified near the stay vanes and wicket gates, runner, and in the draft tube of a large Kaplan turbine. However, under typical operating conditions, computational models estimated that these dangerous areas comprise less than 2% of the flow path through the modeled turbine. The predicted volumes of the damaging shear stress zones did not correlate well with observed fish mortality at a field installation of this turbine, which ranged from less than 1% to nearly 12%. Possible reasons for the poor correlation are discussed. Computational modeling is necessary to develop an understanding of the role of particular fish injury mechanisms, to compare their effects with those of other sources of injury, and to minimize the trial and error previously needed to mitigate those effects. The process we describe is being used to modify the design of hydroelectric turbines to improve fish passage survival.
Houts, Carrie R; Edwards, Michael C; Wirth, R J; Deal, Linda S
2016-11-01
There has been a notable increase in the advocacy of using small-sample designs as an initial quantitative assessment of item and scale performance during the scale development process. This is particularly true in the development of clinical outcome assessments (COAs), where Rasch analysis has been advanced as an appropriate statistical tool for evaluating the developing COAs using a small sample. We review the benefits such methods are purported to offer from both a practical and statistical standpoint and detail several problematic areas, including both practical and statistical theory concerns, with respect to the use of quantitative methods, including Rasch-consistent methods, with small samples. The feasibility of obtaining accurate information and the potential negative impacts of misusing large-sample statistical methods with small samples during COA development are discussed.
Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.
Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min
2011-11-01
The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.
Modelling the Risk Posed by the Zebra Mussel Dreissena polymorpha: Italy as a Case Study
NASA Astrophysics Data System (ADS)
Bosso, Luciano; De Conno, Carmelina; Russo, Danilo
2017-08-01
We generated a risk map to forecast the potential effects of the spreading of zebra mussels Dreissena polymorpha across the Italian territory. We assessed the invader's potential impact on rivers, lakes, watersheds and dams at a fine-grained scale and detected those more at risk that should be targeted with appropriate monitoring. We developed a MaxEnt model and employed weighted overlay analyses to detect the species' potential distribution and generate risk maps for Italy. D. polymorpha has a greater probability of occurring at low to medium altitudes in areas characterised by fluviatile deposits of major streams. Northern and central Italy appear more at risk. Some hydroelectric power dams are at high risk, while most dams for irrigation, drinkable water reservoirs and other dam types are at medium to low risk. The lakes and rivers reaches (representing likely expansion pathways) at medium-high or high risk mostly occur in northern and central Italy. We highlight the importance of modelling potential invasions on a country scale to achieve the sufficient resolution needed to develop appropriate monitoring plans and prevent the invader's harmful effects. Further high-resolution risk maps are needed for other regions partly or not yet colonised by the zebra mussel.
Bangert, Mathieu; Molyneux, David H; Lindsay, Steve W; Fitzpatrick, Christopher; Engels, Dirk
2017-04-04
The Sustainable Development Goals (SDGs) call for an integrated response, the kind that has defined Neglected Tropical Diseases (NTDs) efforts in the past decade.NTD interventions have the greatest relevance for SDG3, the health goal, where the focus on equity, and its commitment to reaching people in need of health services, wherever they may live and whatever their circumstances, is fundamentally aligned with the target of Universal Health Coverage. NTD interventions, however, also affect and are affected by many of the other development areas covered under the 2030 Agenda. Strategies such as mass drug administration or the programmatic integration of NTD and WASH activities (SDG6) are driven by effective global partnerships (SDG17). Intervention against the NTDs can also have an impact on poverty (SDG1) and hunger (SDG2), can improve education (SDG4), work and economic growth (SDG8), thereby reducing inequalities (SDG10). The community-led distribution of donated medicines to more than 1 billion people reinforces women's empowerment (SDG5), logistics infrastructure (SDG9) and non-discrimination against disability (SDG16). Interventions to curb mosquito-borne NTDs contribute to the goals of urban sustainability (SDG11) and resilience to climate change (SDG13), while the safe use of insecticides supports the goal of sustainable ecosystems (SDG15). Although indirectly, interventions to control water- and animal-related NTDs can facilitate the goals of small-scale fishing (SDG14) and sustainable hydroelectricity and biofuels (SDG7).NTDs proliferate in less developed areas in countries across the income spectrum, areas where large numbers of people have little or no access to adequate health care, clean water, sanitation, housing, education, transport and information. This scoping review assesses how in this context, ending the epidemic of the NTDs can impact and improve our prospects of attaining the SDGs.
NASA Astrophysics Data System (ADS)
Platonov, D. V.; Maslennikova, A. V.; Dekterev, D. A.; Minakov, A. V.; Abramov, A. V.
2018-01-01
In the present study, we report on the results of an experimental study of pressure pulsations in the flow duct of a medium-scale hydrodynamic bench with Francis turbine. In various regimes, integral and pulsation characteristics of the turbine were measured. With the help of high-speed filming, the structure of the flow behind the turbine runner was analyzed, and the influence of this structure on the intensity and frequency of pressure pulsations in the flow duct was demonstrated.
16. LIGHTING PLAN OF GENERATOR ROOM, SHOWING CONFIGURATION OF TURBINEGENERATOR ...
16. LIGHTING PLAN OF GENERATOR ROOM, SHOWING CONFIGURATION OF TURBINE-GENERATOR UNITS. UNITS A THROUGH D ARE CURRENTLY DESIGNATED AS NOS. 1 THROUGH 4 (1907) - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
19. Heat Pump, view to the southwest. This system provides ...
19. Heat Pump, view to the southwest. This system provides ventilation air heating and cooling throughout the powerhouse. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Bilotta, Gary S; Burnside, Niall G; Turley, Matthew D; Gray, Jeremy C; Orr, Harriet G
2017-01-01
Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the evenness of the invertebrate community. However, no statistically significant effects were detected on the four other metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future invertebrate community impact studies.
2017-01-01
Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (p<0.05) of ROR HEP construction and operation on the evenness of the invertebrate community. However, no statistically significant effects were detected on the four other metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future invertebrate community impact studies. PMID:28158282
NASA Astrophysics Data System (ADS)
Béguin, A.; Nicolet, C.; Hell, J.; Moreira, C.
2017-04-01
The paper explores the improvement in ancillary services that variable speed technologies can provide for the case of an existing pumped storage power plant of 2x210 MVA which conversion from fixed speed to variable speed is investigated with a focus on the power step performances of the units. First two motor-generator variable speed technologies are introduced, namely the Doubly Fed Induction Machine (DFIM) and the Full Scale Frequency Converter (FSFC). Then a detailed numerical simulation model of the investigated power plant used to simulate power steps response and comprising the waterways, the pump-turbine unit, the motor-generator, the grid connection and the control systems is presented. Hydroelectric system time domain simulations are performed in order to determine the shortest response time achievable, taking into account the constraints from the maximum penstock pressure and from the rotational speed limits. It is shown that the maximum instantaneous power step response up and down depends on the hydro-mechanical characteristics of the pump-turbine unit and of the motor-generator speed limits. As a results, for the investigated test case, the FSFC solution offer the best power step response performances.
Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtis, Taylor L.; Levine, Aaron L.; McLaughlin, Kathleen
This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potentialmore » at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.« less
River flow maintenance turbine for Milner Hydroelectric Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carson, J.L.; Holveck, W.H.; Gokhman, A.
1995-12-31
The Milner Hydroelectric Project on the Snake River in Idaho was commissioned in 1992. The project included renovation of an existing dam, which was built to supply irrigation water to a canal system, construction of a new spillway, and the addition of a new powerhouse. The forebay of the main powerhouse is located on a combination power and irrigation canal, approximately 3500 feet (1070 m) from the dam, with a short tailrace returning the water to the river. There are two Kaplan turbines installed in the main powerhouse, rated at 1000 cfs and 4000 cfs respectively at a net headmore » of 150 feet. The FERC license required that a target flow of 200 cfs be released from the dam to maintain a stream flow between the dam and the powerhouse. In order to utilize this flow, a small powerhouse was constructed at the toe of the dam. The site conditions favored a vertical axial flow turbine, with a net head of 56 feet. As the flow is constant and the head is fairly constant, a fixed geometry turbine was selected, to be controlled solely by the intake gate. Due to the higher head, the main powerhouse can generate more power per unit of flow than can the bypass turbine. Therefore, it is undesirable for the discharge of the bypass turbine to be any greater than required by the license. Also, the release flow is determined by a river gauge, the accuracy of which is unknown, but assumed to be within five percent. In order to meet these two requirements, the turbine was specified to have manually adjustable runner blades to obtain the required release flow of 200 cfs at any head between 55 and 58 feet.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether To Remove Four Dams on the Klamath River in California and Oregon AGENCY: Department of the Interior. ACTION: Notice; correction. SUMMARY: The Department of the...
7. Photocopied August 1971 from Photo 13729, Granite Station Special ...
7. Photocopied August 1971 from Photo 13729, Granite Station Special Folder, Engineering Department, Utah Power and Light Co., Salt Lake City, Utah. GRANITE HYDRO-ELECTRIC PLANT (1500KW) STATION. PENSTOCK AND SPILWAY, NOVEMBER 1914. - Utah Power Company, Granite Hydroelectric Plant, Holladay, Salt Lake County, UT
8. Photocopied August 1971 from Photo 11479, Granite Station Special ...
8. Photocopied August 1971 from Photo 11479, Granite Station Special Folder, Engineering Department, Utah Power and Light Co., Salt Lake City, Utah. GRANITE HYDRO-ELECTRIC PLANT (1500 KW) STATION. PENSTOCK AND SPILWAY, NOVEMBER 1914. - Utah Power Company, Granite Hydroelectric Plant, Holladay, Salt Lake County, UT
78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery..., Office of Electricity Delivery and Energy Reliability (OE-20), U.S. Department of Energy, 1000...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
Energy Perspective: Is Hydroelectricity Green?
ERIC Educational Resources Information Center
Childress, Vincent W.
2009-01-01
The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source…
7. Photocopied August 1971 from Photo 11480, Stairs Station Special ...
7. Photocopied August 1971 from Photo 11480, Stairs Station Special Folder, Engineering Department, Utah Power and Light Co., Salt Lake City, Utah. STAIRS HYDRO-ELECTRIC PLANT (1600 KW) STATION AND PENSTOCK, NOVEMBER 1914. - Utah Power & Light Company, Stairs Hydroelectric Station, Holladay, Salt Lake County, UT
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... power operations with power marketing agencies. 209.141 Section 209.141 Navigation and Navigable Waters... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This regulation... generating facilities with the power marketing agencies. (b) Applicability. This regulation applies to all...
VIEW OF #2 EXCITER WITH GOVERNOR ON GENERATOR FLOOR. THIS ...
VIEW OF #2 EXCITER WITH GOVERNOR ON GENERATOR FLOOR. THIS EXCITER IS DRIVEN BY A HORIZONTAL KAPLAN WHEEL LOCATED ON OPPOSITE SIDE OF WALL IN WHEELROOM. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... telephone. The FERC contact for the Saluda Hydroelectric Project is Lee Emery. Please call Lee Emery at (202) 502-8379 by 4 p.m. EST, June 11, 2010, or by e-mail at lee[email protected] , to receive specific...
Design of full-scale adsorption systems typically includes expensive and time-consuming pilot studies to simulate full-scale adsorber performance. Accordingly, the rapid small-scale column test (RSSCT) was developed and evaluated experimentally. The RSSCT can simulate months of f...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bishop, N.A. Jr.
1994-04-01
Over the past decade, computer-aided design (CAD) has become a practical and economical design tool. Today, specifying CAD hardware and software is relatively easy once you know what the design requirements are. But finding experienced CAD professionals is often more difficult. Most CAD users have only two or three years of design experience; more experienced design personnel are frequently not CAD literate. However, effective use of CAD can be the key to lowering design costs and improving design quality--a quest familiar to every manager and designer. By emphasizing computer-aided design literacy at all levels of the firm, a Canadian joint-venturemore » company that specializes in engineering small hydroelectric projects has cut costs, become more productive and improved design quality. This article describes how they did it.« less
III. FROM SMALL TO BIG: METHODS FOR INCORPORATING LARGE SCALE DATA INTO DEVELOPMENTAL SCIENCE.
Davis-Kean, Pamela E; Jager, Justin
2017-06-01
For decades, developmental science has been based primarily on relatively small-scale data collections with children and families. Part of the reason for the dominance of this type of data collection is the complexity of collecting cognitive and social data on infants and small children. These small data sets are limited in both power to detect differences and the demographic diversity to generalize clearly and broadly. Thus, in this chapter we will discuss the value of using existing large-scale data sets to tests the complex questions of child development and how to develop future large-scale data sets that are both representative and can answer the important questions of developmental scientists. © 2017 The Society for Research in Child Development, Inc.
Integrated water and renewable energy management: the Acheloos-Peneios region case study
NASA Astrophysics Data System (ADS)
Koukouvinos, Antonios; Nikolopoulos, Dionysis; Efstratiadis, Andreas; Tegos, Aristotelis; Rozos, Evangelos; Papalexiou, Simon-Michael; Dimitriadis, Panayiotis; Markonis, Yiannis; Kossieris, Panayiotis; Tyralis, Christos; Karakatsanis, Georgios; Tzouka, Katerina; Christofides, Antonis; Karavokiros, George; Siskos, Alexandros; Mamassis, Nikos; Koutsoyiannis, Demetris
2015-04-01
Within the ongoing research project "Combined Renewable Systems for Sustainable Energy Development" (CRESSENDO), we have developed a novel stochastic simulation framework for optimal planning and management of large-scale hybrid renewable energy systems, in which hydropower plays the dominant role. The methodology and associated computer tools are tested in two major adjacent river basins in Greece (Acheloos, Peneios) extending over 15 500 km2 (12% of Greek territory). River Acheloos is characterized by very high runoff and holds ~40% of the installed hydropower capacity of Greece. On the other hand, the Thessaly plain drained by Peneios - a key agricultural region for the national economy - usually suffers from water scarcity and systematic environmental degradation. The two basins are interconnected through diversion projects, existing and planned, thus formulating a unique large-scale hydrosystem whose future has been the subject of a great controversy. The study area is viewed as a hypothetically closed, energy-autonomous, system, in order to evaluate the perspectives for sustainable development of its water and energy resources. In this context we seek an efficient configuration of the necessary hydraulic and renewable energy projects through integrated modelling of the water and energy balance. We investigate several scenarios of energy demand for domestic, industrial and agricultural use, assuming that part of the demand is fulfilled via wind and solar energy, while the excess or deficit of energy is regulated through large hydroelectric works that are equipped with pumping storage facilities. The overall goal is to examine under which conditions a fully renewable energy system can be technically and economically viable for such large spatial scale.
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ...
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ON #1 PENSTOCK. PROJECT SPONSORED BY THE ELECTRICAL POWER RESEARCH INSTITUTE TO TRANSFER FISH DOWNSTREAM PAST THE TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
...: The proposed Three Sisters Irrigation District Hydroelectric Project would be located on the north pipe of the Three Sisters Irrigation District's Main Canal Pipeline in Deschutes County, Oregon. The... of Project: The Three Sisters Irrigation District Hydroelectric Project would consist of: (1) An...
77 FR 50681 - Pacific Gas and Electric Company; Notice of Receipt of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2130-066] Pacific Gas and Electric Company; Notice of Receipt of Application Take notice that the following hydroelectric application.... Applicant: Pacific Gas and Electric Company (PG&E). e. Name of Project: Spring Gap--Stanislaus Hydroelectric...
VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...
VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF THE ELWHA POWERHOUSE, INCLUDING: METERS, PROTECTIVE RELAYS, AND SWITCHES. NOTE ADDITION OF PERSONAL COMPUTERS FOR POWER METERING AND OPERATIONS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP ...
52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523691 (sheet no. 6; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA
Hydroelectric Generating Facilities General Permit ...
2017-08-28
The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).
Messiah College Biodiesel Fuel Generation Project Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zummo, Michael M; Munson, J; Derr, A
Many obvious and significant concerns arise when considering the concept of small-scale biodiesel production. Does the fuel produced meet the stringent requirements set by the commercial biodiesel industry? Is the process safe? How are small-scale producers collecting and transporting waste vegetable oil? How is waste from the biodiesel production process handled by small-scale producers? These concerns and many others were the focus of the research preformed in the Messiah College Biodiesel Fuel Generation project over the last three years. This project was a unique research program in which undergraduate engineering students at Messiah College set out to research the feasibilitymore » of small-biodiesel production for application on a campus of approximately 3000 students. This Department of Energy (DOE) funded research program developed out of almost a decade of small-scale biodiesel research and development work performed by students at Messiah College. Over the course of the last three years the research team focused on four key areas related to small-scale biodiesel production: Quality Testing and Assurance, Process and Processor Research, Process and Processor Development, and Community Education. The objectives for the Messiah College Biodiesel Fuel Generation Project included the following: 1. Preparing a laboratory facility for the development and optimization of processors and processes, ASTM quality assurance, and performance testing of biodiesel fuels. 2. Developing scalable processor and process designs suitable for ASTM certifiable small-scale biodiesel production, with the goals of cost reduction and increased quality. 3. Conduct research into biodiesel process improvement and cost optimization using various biodiesel feedstocks and production ingredients.« less
SMOOTHING THE PEAKS: SMART OUTLETS TO REDUCE BROWNOUTS ON MICRO-HYDROELECTRIC MINIGRIDS IN BHUTAN
Our proposed project provides a low cost solution for a problem faced by thousands of communities that are seeking to use renewable electricity for sustainable economic development. It also creates a unique opportunity for collaboration between university students from Humbol...
1. CONTEXTUAL VIEW OF THE UPPER FALLS GATE HOUSE, FOREBAY ...
1. CONTEXTUAL VIEW OF THE UPPER FALLS GATE HOUSE, FOREBAY IN FOREGROUND, LOOKING NORTH. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
25. Photocopy of construction drawing (original in the possession of ...
25. Photocopy of construction drawing (original in the possession of the Public Service Company of Colorado, Denver Colorado) Drafting Department, The Central Colorado Power Co., 1907 KEY MAP OF GLENWOOD NO. 1 DEVELOPMENT - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO
The James Bay Project: Reaction or Action?
ERIC Educational Resources Information Center
Mackwood, Gae
1991-01-01
Discusses the plan to restructure northern Quebec's landscape through the James Bay hydroelectric project. Suggests that the project offers opportunities to study development versus preservation, federal versus provincial powers, and the conflict between business and Native communities. Explores the need to teach students to care about social…
An Indigenous View of North America.
ERIC Educational Resources Information Center
LaDuke, Winona
1998-01-01
Uses stories of U.S. and Canadian indigenous individuals who defended their lands against uranium mining and hydroelectric development to contrast the thinking of indigenous people (natural law as pre-eminent, spiritual practice, intergenerational residency in the same place) with industrial thinking (man's dominion over nature, linear thinking,…
1. EXISTING TRASH RAKE STRUCTURE AND STEEL IBEAM TRACK, LOOKING ...
1. EXISTING TRASH RAKE STRUCTURE AND STEEL I-BEAM TRACK, LOOKING EAST/NORTHEAST. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
Restricted-Range Fishes and the Conservation of Brazilian Freshwaters
Nogueira, Cristiano; Buckup, Paulo A.; Menezes, Naercio A.; Oyakawa, Osvaldo T.; Kasecker, Thais P.; Ramos Neto, Mario B.; da Silva, José Maria C.
2010-01-01
Background Freshwaters are the most threatened ecosystems on earth. Although recent assessments provide data on global priority regions for freshwater conservation, local scale priorities remain unknown. Refining the scale of global biodiversity assessments (both at terrestrial and freshwater realms) and translating these into conservation priorities on the ground remains a major challenge to biodiversity science, and depends directly on species occurrence data of high taxonomic and geographic resolution. Brazil harbors the richest freshwater ichthyofauna in the world, but knowledge on endemic areas and conservation in Brazilian rivers is still scarce. Methodology/Principal Findings Using data on environmental threats and revised species distribution data we detect and delineate 540 small watershed areas harboring 819 restricted-range fishes in Brazil. Many of these areas are already highly threatened, as 159 (29%) watersheds have lost more than 70% of their original vegetation cover, and only 141 (26%) show significant overlap with formally protected areas or indigenous lands. We detected 220 (40%) critical watersheds overlapping hydroelectric dams or showing both poor formal protection and widespread habitat loss; these sites harbor 344 endemic fish species that may face extinction if no conservation action is in place in the near future. Conclusions/Significance We provide the first analysis of site-scale conservation priorities in the richest freshwater ecosystems of the globe. Our results corroborate the hypothesis that freshwater biodiversity has been neglected in former conservation assessments. The study provides a simple and straightforward method for detecting freshwater priority areas based on endemism and threat, and represents a starting point for integrating freshwater and terrestrial conservation in representative and biogeographically consistent site-scale conservation strategies, that may be scaled-up following naturally linked drainage systems. Proper management (e. g. forestry code enforcement, landscape planning) and conservation (e. g. formal protection) of the 540 watersheds detected herein will be decisive in avoiding species extinction in the richest aquatic ecosystems on the planet. PMID:20613986
Restricted-range fishes and the conservation of Brazilian freshwaters.
Nogueira, Cristiano; Buckup, Paulo A; Menezes, Naercio A; Oyakawa, Osvaldo T; Kasecker, Thais P; Ramos Neto, Mario B; da Silva, José Maria C
2010-06-30
Freshwaters are the most threatened ecosystems on earth. Although recent assessments provide data on global priority regions for freshwater conservation, local scale priorities remain unknown. Refining the scale of global biodiversity assessments (both at terrestrial and freshwater realms) and translating these into conservation priorities on the ground remains a major challenge to biodiversity science, and depends directly on species occurrence data of high taxonomic and geographic resolution. Brazil harbors the richest freshwater ichthyofauna in the world, but knowledge on endemic areas and conservation in Brazilian rivers is still scarce. Using data on environmental threats and revised species distribution data we detect and delineate 540 small watershed areas harboring 819 restricted-range fishes in Brazil. Many of these areas are already highly threatened, as 159 (29%) watersheds have lost more than 70% of their original vegetation cover, and only 141 (26%) show significant overlap with formally protected areas or indigenous lands. We detected 220 (40%) critical watersheds overlapping hydroelectric dams or showing both poor formal protection and widespread habitat loss; these sites harbor 344 endemic fish species that may face extinction if no conservation action is in place in the near future. We provide the first analysis of site-scale conservation priorities in the richest freshwater ecosystems of the globe. Our results corroborate the hypothesis that freshwater biodiversity has been neglected in former conservation assessments. The study provides a simple and straightforward method for detecting freshwater priority areas based on endemism and threat, and represents a starting point for integrating freshwater and terrestrial conservation in representative and biogeographically consistent site-scale conservation strategies, that may be scaled-up following naturally linked drainage systems. Proper management (e. g. forestry code enforcement, landscape planning) and conservation (e. g. formal protection) of the 540 watersheds detected herein will be decisive in avoiding species extinction in the richest aquatic ecosystems on the planet.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abernethy, C. Scott; Neitzel, Duane A.; Lusty, E. William
The Bonneville Power Administration (BPA), the United States Bureau of Reclamation (USSR), and the Washington State Department of Ecology (WDOE) are funding the construction and evaluation of fish passage facilities and fish protection facilities at irrigation and hydroelectric diversions in the Yakima River Basin, Washington State. The program provides offsite enhancement to compensate for fish and wildlife losses caused by hydroelectric development throughout the Columbia River Basin, and addresses natural propagation of salmon to help mitigate the impact of irrigation in the Yakima River Basin. This report evaluates the flow characteristics of the screening facilities. Studies consisted of velocity measurementsmore » taken in front of the rotary drum screens and within the fish bypass systems during peak flows. Measurements of approach velocity and sweep velocity were emphasized in these studies; however, vertical velocity was also measured. 5 refs., 18 figs., 15 tabs.« less
NASA Technical Reports Server (NTRS)
Aston, T. W.; Fabos, J. G.; Macdougall, E. B.
1982-01-01
Adaptation and derivation were used to develop a procedure for assessing the availability of renewable energy resources on the landscape while simultaneously accounting for the economic, legal, social, and environmental issues required. Done in a step-by-step fashion, the procedure can be used interactively at the computer terminals. Its application in determining the hydroelectricity, biomass, and windpower in a 40,000 acre study area of Western Massachusetts shows that: (1) three existing dam sites are physically capable of being retrofitted for hydropower; (2) each of three general areas has a mean annual windspeed exceeding 14 mph and is conductive to windpower; and (3) 20% of the total land area consists of prime agricultural biomass while 30% of the area is prime forest biomass land.
NASA Technical Reports Server (NTRS)
Vangenderen, J. L. (Principal Investigator); Lock, B. F.
1976-01-01
The author has identified the following significant results. This research program has developed a viable methodology for producing small scale rural land use maps in semi-arid developing countries using imagery obtained from orbital multispectral scanners.
Power Authority calls for wise investment in hydropower
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yould, E.P.
Wise investment in hydropower is one of the most valuable long-term economic actions the state of Alaska can take. A review of the hydro projects shows that investigations needed for construction of the Susitna hydroelectric project will be initiated, while Green Lake and Solomon Gulch projects at Sitka and Valdez will enter their second construction season. Swan Lake and Terror Lake hydropower construction for Ketchikan and Kodiak will also be initiated in 1980 followed by Tyee Lake hydropower for Petersburg and Wrangell. Projects still under investigation which may prove feasible for construction in the future are at Cordova, Homer, Seward,more » Bristol Bay, the Tlingit-Haida area, the lower Kuskokwim and Yukon area, and at some smaller rural communities. Other communities may be able to develop wood or peat fueled generation, wile still others might be able to develop small tidal or wind power generation. The Alaska Power Authority is attempting to expedite these projects, and the end result should be a significant degree of electrical energy independence by the end of the next decade.« less
Precipitation Estimates for Hydroelectricity
NASA Technical Reports Server (NTRS)
Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.
2011-01-01
Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.
5. 30 DIAMETER ACCESS MANHOLE IN THE CENTER OF THE ...
5. 30 DIAMETER ACCESS MANHOLE IN THE CENTER OF THE GATE HOUSE, LOOKING SOUTH. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
13. Greasing Pump and Governor Accumulator Tank Compressors, view to ...
13. Greasing Pump and Governor Accumulator Tank Compressors, view to the west. The greasing pump, visible in left foreground, services all four turbine pits. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
8. Generator Barrel and Shaft of Unit 1, view to ...
8. Generator Barrel and Shaft of Unit 1, view to the northwest, with turbine shaft and thrust bearing visible in upper center of photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Brief reconnaissance study for the addition of hydropower for Lake Manatee Dam, Bradenton, Florida
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gebhard, T.G. Jr.
1983-02-24
The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It was concluded that the development of hydroelectric power at this site does not appear to be economically feasible. (MHR)
76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-07
... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No... Engineers' Red Rock Dam. Staff prepared an environmental assessment (EA), which analyzes the potential... the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Bureau of Land Management to improve agency coordination and discuss the agencies' overlapping jurisdictions (pursuant to the Federal Land Policy and Management Act and the Federal Power Act), on the Eagle...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... Commission staff is consulting with the Louisiana State Historic Preservation Officer (Louisiana SHPO) and the Advisory Council on Historic Preservation (Advisory Council) pursuant to the Advisory Council's regulations, 36 CFR part 800, implementing section 106 of the National Historic Preservation Act, as amended...
76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 447897), the Office of...
River recreation management opportunities in hydroelectric relicensing
James R. Bernier
1992-01-01
Between now and 1993, more than 200 existing hydroelectric projects will come up for relicensing before FERC, the Federal Energy Regulatory Commission. This provides a rare opportunity for agencies and individuals to markedly influence the ecological and recreational balance of these projects. This paper presents an overview of the relicensing process, describes some...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... (Oncorhynchus kisutch) as a result of operation and maintenance of its Klamath Hydroelectric Project (Project... term ``take'' as: ``harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to... the East Side and West Side canals, penstocks, turbines, and powerhouse facilities, (3) Operate and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-27
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 12478-003] Gibson Dam... Commission and is available for public inspection. a. Type of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on the Sun River in Lewis and Clark and Teton...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-23
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC...-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund...
76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested...
51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; ...
51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523690 (sheet no. 5; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2206-030] Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric Project Biological...), NMFS will host a video conference to describe and discuss the terms and conditions in the Biological...
VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED ...
VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED 225 RPM, 17,500 HP. PHOTO BY JET LOWE, HAER, 1995. (Note: the dark hole in the concrete column to the left is from a tear in the negative.) - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... the Draft Environmental Impact Statement for the Toledo Bend Hydroelectric Project On May 17, 2013, the Commission issued a Draft Environmental Impact Statement (draft EIS) for the Toledo Bend Hydroelectric Project No 2105-036 (Toledo Bend Project). The draft EIS documents the views of governmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... Environmental Impact Statement for the Toledo Bend Hydroelectric Project In accordance with the National... Office of Energy Projects has reviewed the application for license for the Toledo Bend Hydroelectric... the Toledo Bend Project. The draft EIS documents the views of governmental agencies, non- governmental...
Othman, Faridah; Taghieh, Mahmood
2016-01-01
Optimal operation of water resources in multiple and multipurpose reservoirs is very complicated. This is because of the number of dams, each dam’s location (Series and parallel), conflict in objectives and the stochastic nature of the inflow of water in the system. In this paper, performance optimization of the system of Karun and Dez reservoir dams have been studied and investigated with the purposes of hydroelectric energy generation and providing water demand in 6 dams. On the Karun River, 5 dams have been built in the series arrangements, and the Dez dam has been built parallel to those 5 dams. One of the main achievements in this research is the implementation of the structure of production of hydroelectric energy as a function of matrix in MATLAB software. The results show that the role of objective function structure for generating hydroelectric energy in weighting method algorithm is more important than water supply. Nonetheless by implementing ε- constraint method algorithm, we can both increase hydroelectric power generation and supply around 85% of agricultural and industrial demands. PMID:27248152
Implementing a Nuclear Power Plant Model for Evaluating Load-Following Capability on a Small Grid
NASA Astrophysics Data System (ADS)
Arda, Samet Egemen
A pressurized water reactor (PWR) nuclear power plant (NPP) model is introduced into Positive Sequence Load Flow (PSLF) software by General Electric in order to evaluate the load-following capability of NPPs. The nuclear steam supply system (NSSS) consists of a reactor core, hot and cold legs, plenums, and a U-tube steam generator. The physical systems listed above are represented by mathematical models utilizing a state variable lumped parameter approach. A steady-state control program for the reactor, and simple turbine and governor models are also developed. Adequacy of the isolated reactor core, the isolated steam generator, and the complete PWR models are tested in Matlab/Simulink and dynamic responses are compared with the test results obtained from the H. B. Robinson NPP. Test results illustrate that the developed models represents the dynamic features of real-physical systems and are capable of predicting responses due to small perturbations of external reactivity and steam valve opening. Subsequently, the NSSS representation is incorporated into PSLF and coupled with built-in excitation system and generator models. Different simulation cases are run when sudden loss of generation occurs in a small power system which includes hydroelectric and natural gas power plants besides the developed PWR NPP. The conclusion is that the NPP can respond to a disturbance in the power system without exceeding any design and safety limits if appropriate operational conditions, such as achieving the NPP turbine control by adjusting the speed of the steam valve, are met. In other words, the NPP can participate in the control of system frequency and improve the overall power system performance.
Small water and wastewater systems: pathways to sustainable development?
Ho, G
2003-01-01
Globally we are faced with billions of people without access to safe water and adequate sanitation. These are generally located in developing communities. Even in developed communities the current large scale systems for supplying water, collecting wastewater and treating it are not environmentally sustainable, because it is difficult to close the cycle of water and nutrients. This paper discusses the advantages of small scale water and wastewater systems in overcoming the difficulties in providing water and wastewater systems in developing communities and in achieving sustainability in both developed and developing communities. Particular attention is given to technology and technology choice, even though technology alone does not provide the complete answer. Disadvantages of small scale systems and how they may be overcome are discussed.
Rainwater Wildlife Area Management Plan : Executive Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.
The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Actmore » directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.« less
Small Scale Beekeeping. Appropriate Technologies for Development. Manual M-17.
ERIC Educational Resources Information Center
Gentry, Curtis
This manual is designed to assist Peace Corps volunteers in the development and implementation of small-scale beekeeping programs as a tool for development. Addressed in the individual chapters are bees and humans; project planning; the types and habits of bees; the essence of beekeeping; bee space and beehives; intermediate technology beekeeping;…
Implementing Small Scale ICT Projects in Developing Countries--How Challenging Is It?
ERIC Educational Resources Information Center
Karunaratne, Thashmee; Peiris, Colombage; Hansson, Henrik
2018-01-01
This paper summarises experiences of efforts made by twenty individuals when implementing small-scale ICT development projects in their organizations located in seven developing countries. The main focus of these projects was the use of ICT in educational settings. Challenges encountered and the contributing factors for implementation success of…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting... staff of the U.S. Fish and Wildlife Service and Eagle Crest Energy as part of its on-going Section 7...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting... staff of the U.S. Fish and Wildlife Service and Eagle Crest Energy as part of its on-going Section 7...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
.... Date filed: June 10, 2013. d. Applicant: Gresham Municipal Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... analysis at this time. n. The Upper Red Lake Dam Hydroelectric Project would consist of the following...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-04
... Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On the Red River, in.... Description of Request: The licensee proposes to amend the license for the Upper Red Lake Dam Hydroelectric... Project No. 2464), which is located immediately downstream from the Upper Red Lake Dam Project; (2) the...
78 FR 41056 - Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... applications for original licenses for the Red River Lock and Dam No. 5 Hydroelectric Project (FERC Project No. 12758-004), Red River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757- 004), and Red... be located on the Red River in Louisiana. The Lock and Dam No. 5 Project would be located in Bossier...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
... Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a.... Purpose of the Meeting: Commission staff will meet with the staff of the Bureau of Land Management to... Land Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage...
75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-21
.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W..., FL 33527, (813) 659-3014; and Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027, (336) 589-6138 i...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... District No. 1 of Douglas County; Notice of Authorization for Continued Project Operation On May 27, 2010, the Public Utility District No. 1 of Douglas County, licensee for the Wells Hydroelectric Project... regulations thereunder. The Wells Hydroelectric Project is located on the Columbia River in Douglas, Okanogan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-16
.... 13826-000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...
EXTERNAL OVERVIEW OF WHEELROOM (TURBINE ROOM) WITH PENSTOCK FOR #1 ...
EXTERNAL OVER-VIEW OF WHEELROOM (TURBINE ROOM) WITH PENSTOCK FOR #1 AND #2 GENERATORS AND #2 EXCITER, VIEWED WEST TO EAST. TURBINES ARE HORIZONTAL TWIN FRANCIS TURBINES, MANUFACTURED BY WELLMAN-SEAVER MORGAN CO. IN 1911. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14163-000; 14174-000; 14181-000; 14195-000] Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund... LLC (Solia), and Riverbank Hydro No. 20 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC.... Lock+ Hydro Friends Fund XVIII: Project No. 14261-000. 2. Riverbank Hydro No. 25, LLC: Project No...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14157-000; 14161-000; 14184-000] Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice.... 7 LLC (Riverbank) and on May 3, 2011, Lock Hydro Friends Fund XXXVIII (Lock Hydro) filed preliminary...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13745-000; Project No. 13758-000; Project No. 13767-000] Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4... Hydroelectric, LLC--Project No. 13767-000 2. FFP Missouri 14, LLC--Project No. 13758-000 3. Lock Hydro Friends...
76 FR 51027 - F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-17
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12629-003] F&B Wood... the Commission's regulations,\\1\\ F&B Wood Corporation, exemptee for the Corriveau Hydroelectric... Project No. 12629 on October 24, 2006. F&B Wood Corp.,117 FERC ] 62,059 (2006) \\3\\ See filings of May 9...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-01-01
The report on House Joint Resolution 382, as amended, would allow a 10-year license for a hydroelectric plant currently operating within Sequoia National Park, but prohibit any expansion of the project. The first hydroelectric facility on the Kaweah River dates from the 1890s, shortly after the park was established to preserve California's sequoia trees. The legislation would require no additional federal funding and have no inflationary impact. Correspondence from the Department of Interior to the committee outlines the Department's philosophy and findings regarding the facility and suggests amendments along the lines of those proposed by the committee.
NASA Astrophysics Data System (ADS)
He, Yaoyao; Yang, Shanlin; Xu, Qifa
2013-07-01
In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.
Grid-connected in-stream hydroelectric generation based on the doubly fed induction machine
NASA Astrophysics Data System (ADS)
Lenberg, Timothy J.
Within the United States, there is a growing demand for new environmentally friendly power generation. This has led to a surge in wind turbine development. Unfortunately, wind is not a stable prime mover, but water is. Why not apply the advances made for wind to in-stream hydroelectric generation? One important advancement is the creation of the Doubly Fed Induction Machine (DFIM). This thesis covers the application of a gearless DFIM topology for hydrokinetic generation. After providing background, this thesis presents many of the options available for the mechanical portion of the design. A mechanical turbine is then specified. Next, a method is presented for designing a DFIM including the actual design for this application. In Chapter 4, a simulation model of the system is presented, complete with a control system that maximizes power generation based on water speed. This section then goes on to present simulation results demonstrating proper operation.
NASA Astrophysics Data System (ADS)
Nishi, Yasuyuki; Hatano, Kentaro; Inagaki, Terumi
2017-10-01
Recently, small hydroelectric generators have gained attention as a further development in water turbine technology for ultra low head drops in open channels. The authors have evaluated the application of cross-flow water turbines in open channels as an undershot type after removing the casings and guide vanes to substantially simplify these water turbines. However, because undershot cross-flow water turbines are designed on the basis of cross-flow water turbine runners used in typical pipelines, it remains unclear whether the number of blades has an effect on the performance or flow fields. Thus, in this research, experiments and numerical analyses are employed to study the performance and flow fields of undershot cross-flow water turbines with varying number of blades. The findings show that the turbine output and torque are lower, the fluctuation is significantly higher, and the turbine efficiency is higher for runners with 8 blades as opposed to those with 24 blades.
Distance, dams and drift: What structures populations of an endangered, benthic stream fish?
Roberts, James H.; Angermeier, Paul; Hallerman, Eric M.
2013-01-01
Spatial population structure plays an important role in species persistence, evolution and conservation. Benthic stream fishes are diverse and frequently imperilled, yet the determinants and spatial scaling of their population structure are understudied. We investigated the range-wide population genetic structure of Roanoke logperch (Percina rex), an endangered, benthic stream fish of the eastern United States. Fish were sampled from 35 sites and analysed at 11 microsatellite DNA loci. Clustering models were used to sort individuals into genetically cohesive groups and thereby estimate the spatial scaling of population structure. We then used Bayesian generalized linear mixed models (BGLMMs) to test alternative hypotheses about the environmental factors most responsible for generating structure, as measured by the differentiation statistic FST. Clustering models delineated seven discrete populations, whose boundaries coincided with agents of fragmentation, including hydroelectric dams and tailwaters. In the absence of hydrological barriers, gene flow was extensive throughout catchments, whereas there was no evidence for contemporary dispersal between catchments across barriers. In the best-supported BGLMM, FST was positively related to the spatial distance and degree of hydrological alteration between sites and negatively related to genetic diversity within sites. Whereas the effect of tailwaters was equivocal, dams strongly influenced differentiation: the effect of a dam on FST was comparable to that of a between-site distance of over 1200 km of unimpounded river. Overall, the effect of distance-mediated dispersal was negligible compared to the combined effects of fragmentation and genetic drift. The contemporary population structure of P. rex comprises a few geographically extensive ‘islands’ that are fragmented by hydroelectric projects. This information clarifies the importance of a catchment-scale perspective on conserving the species and suggests that its recovery may require genetic and/or demographic reconnection of presently isolated populations.
75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... Gold, Assistant Regional Director, Upper Colorado Region. [FR Doc. 2010-13149 Filed 6-1-10; 8:45 am..., Dallas Creek Project, Colorado AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of intent to..., Area Manager, Western Colorado Area Office, Bureau of Reclamation, 2764 Compass Drive, Suite 106, Grand...
PNNL Tests Fish Passage System
Colotelo, Alison
2018-01-16
Scientists from PNNL are testing a fish transportation system developed by Whooshh Innovations. The Whooshh system uses a flexible tube that works a bit like a vacuum, guiding fish over hydroelectric dams or other structures. Compared to methods used today, this system could save money while granting fish quicker, safer passage through dams and hatcheries.
4. PULLEY SYSTEM AND CABLE FOR GATELIFTING MECHANISM, MOUNTED ABOVE ...
4. PULLEY SYSTEM AND CABLE FOR GATE-LIFTING MECHANISM, MOUNTED ABOVE THE THREE GATE OPENINGS, LOOKING SOUTH/SOUTHEAST. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
3. EAST FACADE OF THE UPPER FALLS GATE HOUSE, FOREBAY ...
3. EAST FACADE OF THE UPPER FALLS GATE HOUSE, FOREBAY IN LEFT FOREGROUND, SPOKANE CITY HALL IN LEFT BACKGROUND, LOOKING WEST. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
78 FR 25262 - Duke Energy Carolinas, LLC; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
... the Catawba-Wateree Hydroelectric Project's Bridgewater Development, which is located on the Catawba..., would not constitute a major Federal action significantly affecting the quality of the human environment...://www.ferc.gov using the ``eLibrary'' link. Enter the docket number (P- 2232) in the docket number field...
78 FR 44107 - Monadnock Paper Mills, Inc.; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... new license for the multi-development Monadnock Hydroelectric Project, located along a five-mile reach... human environment. A copy of the EA is on file with the Commission and is available for public...Library'' link. Enter the docket number, excluding the last three digits in the docket number field, to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-22
... a Federal Government facility. Depending on the economic viability of the proposed hydropower.... Identify proposed methods of financing the hydropower development. An economic analysis should be presented... and provide for long-term operation and maintenance; and (3) best share the economic benefits of the...
77 FR 11518 - Commission Information Collection Activities; Comment Request; Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... grants the Commission authority to issue licenses for the development and improvement of navigation and... nonfederal hydroelectric plants.\\2\\ \\1\\ 16 U.S.C. Section 797d (2010). \\2\\ Public Law 99-495, 100 Stat. 1243... of information technology. Dated: February 17, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012-4418...
PNNL Tests Fish Passage System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Colotelo, Alison
2015-03-13
Scientists from PNNL are testing a fish transportation system developed by Whooshh Innovations. The Whooshh system uses a flexible tube that works a bit like a vacuum, guiding fish over hydroelectric dams or other structures. Compared to methods used today, this system could save money while granting fish quicker, safer passage through dams and hatcheries.
7. Unit 3 Service Water System Valves, view to the ...
7. Unit 3 Service Water System Valves, view to the east. These pipes and valves supply water from the draft chest for cooling the generator barrels. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
ERIC Educational Resources Information Center
Schnittka, Christine
2017-01-01
Many students (and adults) do not understand a basic tenet of energy literacy: how electricity is produced. They do not know how coal or other fossil fuels are used to make electricity, nor do they understand how nuclear power, hydroelectric power, and wind power work. The author developed a series of lessons to help students understand how…
11. Station Accumulator Tanks, view to the northeast. The tanks ...
11. Station Accumulator Tanks, view to the northeast. The tanks are visible along the right side of photograph, opposite a wall of the Unit 1 turbine pit. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yde, Chis
1990-06-01
The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less
Cardoso, Simone J; Vidal, Luciana O; Mendonça, Raquel F; Tranvik, Lars J; Sobek, Sebastian; Fábio, Roland
2013-01-01
Substantial amounts of organic matter (OM) from terrestrial ecosystems are buried as sediments in inland waters. It is still unclear to what extent this OM constitutes a sink of carbon, and how much of it is returned to the atmosphere upon mineralization to carbon dioxide (CO2). The construction of reservoirs affects the carbon cycle by increasing OM sedimentation at the regional scale. In this study we determine the OM mineralization in the sediment of three zones (river, transition, and dam) of a tropical hydroelectric reservoir in Brazil as well as identify the composition of the carbon pool available for mineralization. We measured sediment organic carbon mineralization rates and related them to the composition of the OM, bacterial abundance and pCO2 of the surface water of the reservoir. Terrestrial OM was an important substrate for the mineralization. In the river and transition zones most of the OM was allochthonous (56 and 48%, respectively) while the dam zone had the lowest allochthonous contribution (7%). The highest mineralization rates were found in the transition zone (154.80 ± 33.50 mg C m(-) (2) d(-) (1)) and the lowest in the dam (51.60 ± 26.80 mg C m(-) (2) d(-) (1)). Moreover, mineralization rates were significantly related to bacterial abundance (r (2) = 0.50, p < 0.001) and pCO2 in the surface water of the reservoir (r (2) = 0.73, p < 0.001). The results indicate that allochthonous OM has different contributions to sediment mineralization in the three zones of the reservoir. Further, the sediment mineralization, mediated by heterotrophic bacteria metabolism, significantly contributes to CO2 supersaturation in the water column, resulting in higher pCO2 in the river and transition zones in comparison with the dam zone, affecting greenhouse gas emission estimations from hydroelectric reservoirs.
The paper reports the latest efforts to complete development of Phase 2 of a three-phase effort to develop a family of small-scale (1 to 20 MWe) biomass-fueled power plants. The concept envisioned is an air-blown pressurized fluidized-bed gasifier followed by a dry hot gas clean...
NASA Astrophysics Data System (ADS)
Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.
2016-11-01
Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Hydroelectric, LLC (BOST3). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bassier Parish near the Town of Ninock, Louisiana. g. Filed Pursuant to: Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
.... Name of Project: Red Rock Hydroelectric Project. f. Location: The project is located at the U.S. Army Corps of Engineers Lake Red Rock Dam on the Des Moines River in Marion County, Iowa. g. Filed Pursuant.... Army Corps of Engineers' Lake Red Rock Dam. The applicant's proposal also includes the installation of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the City of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
...). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
.... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W... Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Kevin Edwards, P.O. Box...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
... incidental take of one ESA-listed species as a result of operation and maintenance of the Klamath..., pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct... maintenance of the Klamath Hydroelectric Project (Project) and implementation of the Plan for a 10-year period...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14162-000; 14173-000; 14182-000; 14192-000] Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI... LLC (Solia), and Riverbank Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...
Scale issues in tourism development
Sinji Yang; Lori Pennington-Gray; Donald F. Holecek
1998-01-01
Proponents of Alternative Tourism overwhelmingly believe that alternative forms of tourism development need to be small in scale. Inasmuch as tourists' demand has great power to shape the market, the issues surrounding the tourism development scale deserve further consideration. This paper discusses the implications and effects of the tourism development scale on...
Low-Energy, Low-Cost Production of Ethylene by Low- Temperature Oxidative Coupling of Methane
DOE Office of Scientific and Technical Information (OSTI.GOV)
Radaelli, Guido; Chachra, Gaurav; Jonnavittula, Divya
In this project, we develop a catalytic process technology for distributed small-scale production of ethylene by oxidative coupling of methane at low temperatures using an advanced catalyst. The Low Temperature Oxidative Coupling of Methane (LT-OCM) catalyst system is enabled by a novel chemical catalyst and process pioneered by Siluria, at private expense, over the last six years. Herein, we develop the LT-OCM catalyst system for distributed small-scale production of ethylene by identifying and addressing necessary process schemes, unit operations and process parameters that limit the economic viability and mass penetration of this technology to manufacture ethylene at small-scales. The outputmore » of this program is process concepts for small-scale LT-OCM catalyst based ethylene production, lab-scale verification of the novel unit operations adopted in the proposed concept, and an analysis to validate the feasibility of the proposed concepts.« less
Obi, James; Ibidunni, Ayodotun Stephen; Tolulope, Atolagbe; Olokundun, Maxwell Ayodele; Amaihian, Augusta Bosede; Borishade, Taiye Tairat; Fred, Peter
2018-06-01
The focus of this research was to present a data article on the contribution of SMEs to economic development in a transiting economy. Descriptive research design was adopted in this study. Data were obtained from 600 respondents in 60 small-scale enterprises located in different parts of the country (20 small-scale enterprises located in Lagos State, 20 in Anambra State and 20 in Kano State of Nigeria respectively). Data analysis was carried out using tables and percentages and the null hypotheses of the study was tested using chi-square ( X 2 ) inferential statistical model at 5% level of significance. The findings revealed that there is a significant relationship between the operation of small and medium-scale enterprises and economic growth in developing nations.
Maeda, Jin; Suzuki, Tatsuya; Takayama, Kozo
2012-12-01
A large-scale design space was constructed using a Bayesian estimation method with a small-scale design of experiments (DoE) and small sets of large-scale manufacturing data without enforcing a large-scale DoE. The small-scale DoE was conducted using various Froude numbers (X(1)) and blending times (X(2)) in the lubricant blending process for theophylline tablets. The response surfaces, design space, and their reliability of the compression rate of the powder mixture (Y(1)), tablet hardness (Y(2)), and dissolution rate (Y(3)) on a small scale were calculated using multivariate spline interpolation, a bootstrap resampling technique, and self-organizing map clustering. The constant Froude number was applied as a scale-up rule. Three experiments under an optimal condition and two experiments under other conditions were performed on a large scale. The response surfaces on the small scale were corrected to those on a large scale by Bayesian estimation using the large-scale results. Large-scale experiments under three additional sets of conditions showed that the corrected design space was more reliable than that on the small scale, even if there was some discrepancy in the pharmaceutical quality between the manufacturing scales. This approach is useful for setting up a design space in pharmaceutical development when a DoE cannot be performed at a commercial large manufacturing scale.
Environmentally Sound Small-Scale Forestry Projects. Guidelines for Planning.
ERIC Educational Resources Information Center
Ffolliott, Peter F.; Thames, John L.
This manual, the third in a series of publications that address community development possibilities in developing nations, provides guidelines for small-scale forestry projects that are integrative and conservation-oriented. Chapters focus on: (1) users and uses (specifying targeted audience and general objectives); (2) planning process (including…
ERIC Educational Resources Information Center
Lee, Kye Woo
2006-01-01
In many developing countries, small- and medium-scale enterprises (SMEs) account for a large part of national employment and income. Therefore, governments have used various strategies/policy instruments to develop human resources for SMEs and improve their productivity and national welfare. In the literature, however, there has been little effort…
Propulsion simulator for magnetically-suspended wind tunnel models
NASA Technical Reports Server (NTRS)
Joshi, Prakash B.; Goldey, C. L.; Sacco, G. P.; Lawing, Pierce L.
1991-01-01
The objective of phase two of a current investigation sponsored by NASA Langley Research Center is to demonstrate the measurement of aerodynamic forces/moments, including the effects of exhaust gases, in magnetic suspension and balance system (MSBS) wind tunnels. Two propulsion simulator models are being developed: a small-scale and a large-scale unit, both employing compressed, liquified carbon dioxide as propellant. The small-scale unit was designed, fabricated, and statically-tested at Physical Sciences Inc. (PSI). The large-scale simulator is currently in the preliminary design stage. The small-scale simulator design/development is presented, and the data from its static firing on a thrust stand are discussed. The analysis of this data provides important information for the design of the large-scale unit. A description of the preliminary design of the device is also presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-27
... at the U.S. Army Corps of Engineers' (Corps) Columbia Lock & Dam, located on the Ouachita River near... & Dam Hydroelectric Project No. 13824-000 would consist of: (1) Two to four compact bulb turbines, with... Dam; (2) a 40-foot x 60-foot control building located on the South Carolina side of the river; and (3...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, near the town of Ninock near the City of Shreveport, Louisiana. g. Filed Pursuant to...
Center stage in the Philippines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meade, W.
1993-03-01
At present, early 5,000 MW of private power capacity is operating or under development in the Philippines. Projects include oil- and coal-fired, geothermal, and hydroelectric projects under a variety of financing and ownership arrangements. If all projects and solicitations come to fruition, more than 80% of new capacity added through the year 2000 will be privately owned.
76 FR 65717 - Erie Boulevard Hydropower, L.P.; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-24
... application for license for the multi-development Oswegatchie River Hydroelectric Project, located along a 90... that would significantly affect the quality of the human environment. A copy of the EA is available for... http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding the last three...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... organization, length of time in business, experience in funding, design and construction of similar projects... Standard Time) on January 6, 2014. A proposal will be considered timely only if it is received in the... advised to provide sufficient time for delivery. Late proposals will not be considered. ADDRESSES: Send...
12. NORTH FACADE, OPERATOR'S COTTAGE, SILK STOCKING ROW, NEWHALEM. THE ...
12. NORTH FACADE, OPERATOR'S COTTAGE, SILK STOCKING ROW, NEWHALEM. THE HOUSES WERE CONSTRUCTED SO THAT WHAT APPEARS TO BE THE FRONT OF THE HOUSE FACES THE RIVER AND THE FACADE FACING THE STREET LOOKS LIKE A BACK, 1989. - Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric Project, On Skagit River, Newhalem, Whatcom County, WA
Small Scale Marine Fisheries: An Extension Training Manual. TR-30.
ERIC Educational Resources Information Center
Martinson, Steven; And Others
This manual is designed for use in a preservice training program for prospective volunteers whose Peace Corps service will be spent working with small-scale artisanal fishing communities in developing nations. The program consists of 8 weeks of intensive training to develop competencies in marine fisheries technology and fisheries extension work…
Renewable power sparks financial interest
NASA Astrophysics Data System (ADS)
Norman, C.
1981-06-01
A legal and economic assessment is given of section 210 of the Public Utility Regulatory Practices Act (PURPA) of 1978, which guarantees a market for small electrical power producers by requiring utilities to buy from them at premium rates and, in addition, exempts them from regulatory restrictions imposed on utilities. To qualify, small power producers are limited to a capacity of 80 MW at any one site, and they must use such renewable energy sources as wind, hydroelectric, biomass, solar, and waste products. There is no size limit for industrial cogeneration facilities, but those that burn oil or natural gas must meet efficiency standards to qualify. Section 210 has, however, been seriously challenged in the courts by utility companies viewing it as a Federal infringement of the right of States to regulate their utilities; a court ruling favorable to the utilities has already been given in Mississippi, and similar rulings are being sought in New York.
A robust quantitative near infrared modeling approach for blend monitoring.
Mohan, Shikhar; Momose, Wataru; Katz, Jeffrey M; Hossain, Md Nayeem; Velez, Natasha; Drennen, James K; Anderson, Carl A
2018-01-30
This study demonstrates a material sparing Near-Infrared modeling approach for powder blend monitoring. In this new approach, gram scale powder mixtures are subjected to compression loads to simulate the effect of scale using an Instron universal testing system. Models prepared by the new method development approach (small-scale method) and by a traditional method development (blender-scale method) were compared by simultaneously monitoring a 1kg batch size blend run. Both models demonstrated similar model performance. The small-scale method strategy significantly reduces the total resources expended to develop Near-Infrared calibration models for on-line blend monitoring. Further, this development approach does not require the actual equipment (i.e., blender) to which the method will be applied, only a similar optical interface. Thus, a robust on-line blend monitoring method can be fully developed before any large-scale blending experiment is viable, allowing the blend method to be used during scale-up and blend development trials. Copyright © 2017. Published by Elsevier B.V.
ERIC Educational Resources Information Center
Supasorn, Saksri
2015-01-01
This study aimed to develop the small-scale experiments involving electrochemistry and the galvanic cell model kit featuring the sub-microscopic level. The small-scale experiments in conjunction with the model kit were implemented based on the 5E inquiry learning approach to enhance students' conceptual understanding of electrochemistry. The…
Upper Minnesota River Subbasins Study (Public Law 87-639). Stage 1. Report Alternatives.
1980-01-01
cropland, pasture, range or woodland. This Includes farmsteads, farm roads,*feed lots, fence rowis, wildlife land, and rural nonfarm land. 32...HABITAT 7 EXCESS WATER ON AGRICULTURAL LAND 7 NEED FOR ADDITIONAL RECREATION OPPORTUNITIES 8 WATER SUPPLY NEED 8 NEED TO DEVELOP HYDROELECTRIC POWER 8...installation of works of improvement needed for flood prevention or the conser- vation, development , utilization and disposal of water, and for flood control
Maillot, Pauline; Dommes, Aurélie; Dang, Nguyen-Thong; Vienne, Fabrice
2017-02-01
A virtual-reality training program has been developed to help older pedestrians make safer street-crossing decisions in two-way traffic situations. The aim was to develop a small-scale affordable and transportable simulation device that allowed transferring effects to a full-scale device involving actual walking. 20 younger adults and 40 older participants first participated in a pre-test phase to assess their street crossings using both full-scale and small-scale simulation devices. Then, a trained older group (20 participants) completed two 1.5-h training sessions with the small-scale device, whereas an older control group received no training (19 participants). Thereafter, the 39 older trained and untrained participants took part in a 1.5-h post-test phase again with both devices. Pre-test phase results suggested significant differences between both devices in the group of older participants only. Unlike younger participants, older participants accepted more often to cross and had more collisions on the small-scale simulation device than on the full-scale one. Post-test phase results showed that training older participants on the small-scale device allowed a significant global decrease in the percentage of accepted crossings and collisions on both simulation devices. But specific improvements regarding the way participants took into account the speed of approaching cars and vehicles in the far lane were notable only on the full-scale simulation device. The findings suggest that the small-scale simulation device triggers a greater number of unsafe decisions compared to a full-scale one that allows actual crossings. But findings reveal that such a small-scale simulation device could be a good means to improve the safety of street-crossing decisions and behaviors among older pedestrians, suggesting a transfer of learning effect between the two simulation devices, from training people with a miniature device to measuring their specific progress with a full-scale one. Copyright © 2016 Elsevier Ltd. All rights reserved.
Mauls, Alec G.; Mesa, Matthew G.
1994-01-01
We tested the efficacy of using electrofishing to collect juvenile fall chinook salmon Oncorhynchus tshawytscha to assess their plasma cortisol concentrations. In laboratory experiments, plasma cortisol titers of fish sampled immediately (<4 s) after a 1.5-s, 500-V DC electroshock were not different from controls (mean ± SE, 28.8 ± 5.2 ng/mL), but within 15 min they were significantly higher (148.2 ± 19.0 ng/mL) than controls. Plasma cortisol levels of fish released through turbines and of those released through the juvenile-bypass system at Bonneville Dam, Oregon-Washington, and collected by electrofishing did not differ from each other or from prerelease samples (about 70 ± 7 ng/mL). Our results indicate that electrofishing can be used to collect fish for stress assessment in the wild, provided fish are sacrificed immediately after capture. We are concerned, however, that the small number of fish we captured by electrofishing may not be representative of the majority of fish that pass through turbines or bypass systems. The fish used in this study were not migrating smolts and so were not typical of juvenile chinook salmon passing through hydroelectric dams on the Columbia River. Developmental as well as species- and stock-related factors should be addressed in future studies.
1981-07-01
expanding the powerhouse) or uprating existing units to higher generating capacity by rehabilitating, modifying or replacing turbines and/or...fluid energy loss in flow passage and energy loss in converting fluid energy (flow and head) to mechanical energy ( turbine output) to electrical...energy (generator output). The significant practical opportunity is improvement of the energy conversion efficiency of the hydraulic turbine since the
Itaipu royalties: The role of the hydroelectric sector in water resource management.
Lorenzon, Alexandre Simões; Alvares Soares Ribeiro, Carlos Antonio; Rosa Dos Santos, Alexandre; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Soares, Vicente Paulo; Martins de Castro, Nero Lemos; Teixeira, Thaisa Ribeiro; Martins da Costa de Menezes, Sady Júnior; Silva, Elias; de Oliveira Barros, Kelly; Amaral Dino Alves Dos Santos, Gleissy Mary; Ferreira da Silva, Samuel; Santos Mota, Pedro Henrique
2017-02-01
For countries dependent on hydroelectricity, water scarcity poses a real risk. Hydroelectric plants are among the most vulnerable enterprises to climate change. Investing in the conservation of the hydrographic basin is a solution found by the hydropower sector. Given the importance of the Itaipu plant to the energy matrix of Brazil and Paraguay, the aim of this study is to review the current distribution of royalties from Itaipu, using the hydrographic basin as a of criterion of analysis. Approximately 98.73% of the Itaipu basin is in Brazil. The flow contributes 99% of the total electricity generated there, while the drop height of the water contributes only 1%. Under the current policy, royalties are shared equally between Brazil and Paraguay. In the proposed approach, each country would receive a percentage for their participation in the drop height and water flow in the output of the turbines, which are intrinsic factors for electricity generation. Thus, Brazil would receive 98.35% of the royalties and Paraguay, 1.65%. The inclusion of the hydrographic basin as a criterion for the distribution of royalties will promote more efficient water resource management, since the payment will be distributed throughout the basin of the plant. The methodology can be applied to hydroelectric projects worldwide. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
McFarland, Jacob A.; Reilly, David; Black, Wolfgang; Greenough, Jeffrey A.; Ranjan, Devesh
2015-07-01
The interaction of a small-wavelength multimodal perturbation with a large-wavelength inclined interface perturbation is investigated for the reshocked Richtmyer-Meshkov instability using three-dimensional simulations. The ares code, developed at Lawrence Livermore National Laboratory, was used for these simulations and a detailed comparison of simulation results and experiments performed at the Georgia Tech Shock Tube facility is presented first for code validation. Simulation results are presented for four cases that vary in large-wavelength perturbation amplitude and the presence of secondary small-wavelength multimode perturbations. Previously developed measures of mixing and turbulence quantities are presented that highlight the large variation in perturbation length scales created by the inclined interface and the multimode complex perturbation. Measures are developed for entrainment, and turbulence anisotropy that help to identify the effects of and competition between each perturbations type. It is shown through multiple measures that before reshock the flow processes a distinct memory of the initial conditions that is present in both large-scale-driven entrainment measures and small-scale-driven mixing measures. After reshock the flow develops to a turbulentlike state that retains a memory of high-amplitude but not low-amplitude large-wavelength perturbations. It is also shown that the high-amplitude large-wavelength perturbation is capable of producing small-scale mixing and turbulent features similar to the small-wavelength multimode perturbations.
ERIC Educational Resources Information Center
Bass, Kristin M.; Drits-Esser, Dina; Stark, Louisa A.
2016-01-01
The credibility of conclusions made about the effectiveness of educational interventions depends greatly on the quality of the assessments used to measure learning gains. This essay, intended for faculty involved in small-scale projects, courses, or educational research, provides a step-by-step guide to the process of developing, scoring, and…
ERIC Educational Resources Information Center
Coordination in Development, New York, NY.
This booklet was produced in response to the growing need for reliable environmental assessment techniques that can be applied to small-scale development projects. The suggested techniques emphasize low-technology environmental analysis. Although these techniques may lack precision, they can be extremely valuable in helping to assure the success…
Occupational health issues in small-scale industries in Sri Lanka: An underreported burden.
Suraweera, Inoka K; Wijesinghe, Supun D; Senanayake, Sameera J; Herath, Hema D B; Jayalal, T B Ananda
2016-10-17
Work-related diseases and occupational accidents affect a significant number of workers globally. The majority of these diseases and accidents are reported from developing countries; and a large percentage of the workforce in developing countries is estimated to be employed in small-scale industries. Sri Lanka is no exception. These workers are exposed to occupational hazards and are at a great risk of developing work- related diseases and injuries. To identify occupational health issues faced by small-scale industry workers in Sri Lanka. A cross sectional study was conducted among workers in four selected small-scale industry categories in two districts of Sri Lanka. A small-scale industry was defined as a work setting with less than 20 workers. Cluster sampling using probability proportionate to size of workers was used. Eighty clusters with a cluster size of eight from each district were selected. Data was collected using a pre-tested interviewer administered questionnaire. Our study surveyed 198 industries. Headache (2.2%, 95% CI 1.5-3.1) and eye problems (2.1%, 95% CI 1.4-2.9) were the commonest general health issues detected. Back pain (4.8%, 95% CI 3.8-6.1) was the most prevalent work-related musculoskeletal pain reported. Knee pain was the second highest (4.4%, 95% CI 3.4-5.6). Most of the work-related musculoskeletal pain was either of short duration or long lasting. Work-related musculoskeletal pain was much more common than the general health issues reported. Health promotional programs at workplaces focusing ergonomics will benefit the workers at small-scale industries inSri Lanka.
NASA Astrophysics Data System (ADS)
Mert, Burak; Aytac, Zeynep; Tascioglu, Yigit; Celebioglu, Kutay; Aradag, Selin; ETU Hydro Research Center Team
2014-11-01
This study deals with the design of a power regulation mechanism for a Hydroelectric Power Plant (HEPP) model turbine test system which is designed to test Francis type hydroturbines up to 2 MW power with varying head and flow(discharge) values. Unlike the tailor made regulation mechanisms of full-sized, functional HEPPs; the design for the test system must be easily adapted to various turbines that are to be tested. In order to achieve this adaptability, a dynamic simulation model is constructed in MATLAB/Simulink SimMechanics. This model acquires geometric data and hydraulic loading data of the regulation system from Autodesk Inventor CAD models and Computational Fluid Dynamics (CFD) analysis respectively. The dynamic model is explained and case studies of two different HEPPs are performed for validation. CFD aided design of the turbine guide vanes, which is used as input for the dynamic model, is also presented. This research is financially supported by Turkish Ministry of Development.
NASA Astrophysics Data System (ADS)
Redpath, David; Ward, Michael J.
2017-07-01
The maximum exploitable potential for low head hydroelectric sites (gross head≤10 m) in Northern Ireland (NI) was determined as 12.07 MW using a simple payback analysis for 304 potential sites investigated to derive a classification scheme in terms of economic viability. A techno-economic analysis with validated numerical models from previous research estimated the capital investment required for the development of a hydroelectric plant, using the low head Michell-Banki cross flow turbine, for the 304 sites investigated. The number of potentially viable sites in NI for low head hydro ranged from 198 to 286 with an estimated installed capacity ranging from 11.95 to 12.05 MW. Sites with a limited installed capacity were not economically viable unless increased government support in the form of longer term (25-50 years) low interest loans as well as the current (Renewables Obligations Certificates) Renewables Obligation Certificates scheme is provided and sustained.
NASA Astrophysics Data System (ADS)
Stanzel, Philipp; Kling, Harald; Nicholson, Kit
2014-05-01
Hydropower is the most important energy source in Mozambique, as in many other southern African countries. In the Zambezi basin, it is one of the major economic resources, and substantial hydropower development is envisaged for the next decades. In Mozambique, the extension of the large Cahora Bassa hydropower plant and the construction of several new facilities downstream are planned. Irrigated agriculture currently plays a minor role, but has a large potential due to available land and water resources. Irrigation development, especially for the production of biofuels, is an important government policy goal in Mozambique. This contribution assesses interrelations and trade-offs between these two development options with high dependence on water availability. Potential water demand for large-scale irrigated agriculture is estimated for a mix of possible biofuel crops in three scenarios with different irrigated area sizes. Impacts on river discharge and hydropower production in the Lower Zambezi and its tributaries under two projected future climates are simulated with a hydrological model and a reservoir operation and hydropower model. Trade-offs of increasing biofuel production with decreasing hydropower generation due to diminished discharge in the Zambezi River are investigated based on potential energy production, from hydropower and biofuels, and resulting gross revenues and net benefits. Results show that the impact of irrigation withdrawal on hydropower production is rather low due to the generally high water availability in the Zambezi River. In simulations with substantial irrigated areas, hydropower generation decreases by -2% as compared to a scenario with only small irrigated areas. The economic analyses suggest that the use of water for cultivation of biofuel crops in the Zambezi basin can generate higher economic benefits than the use of water for hydroelectric power production. If world oil prices stay at more than about 80 USD/barrel, then the production of biofuels for oil import substitution will yield strong benefits except for the least efficient producers. Producing biofuels for export is more challenging and requires highly efficient production. Generally, investment in irrigated agriculture is expected to have more impact on local economy and therefore poverty reduction than investment in hydropower development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NeSmith, Frank; Long, Mack; Matthews, Dayne
This report was funded by the Bonneville Power Administration (BPA), US Department of Energy, as part of BPA`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Illegal harvest and violation of habitat protection regulations are factors affecting the survival of many native species of anadromous and resident fish in the Columbia Basin.
2015-01-01
Canada is a net exporter of most energy commodities and a significant producer of crude oil and other liquids from oil sands, natural gas, and hydroelectricity. Energy exports to the United States account for the vast majority of Canada's total energy exports. However, because of economic and other considerations, Canada is developing ways to diversify its trading partners, especially by expanding ties with emerging markets in Asia.
The Prestige of a City as Perceived by the Young People of Tolyatti
ERIC Educational Resources Information Center
Tsvetkova, I. V.
2011-01-01
Starting in the mid-twentieth century, Tolyatti became a city that developed on the basis of the implementation of three projects: the hydroelectric power station, chemical plants, and the motor vehicle plant (AVTOVAZ). During that period of time, young people came to the Stavropol and Tolyatti area from various regions of the country to take part…
11. SOUTH FACADE (FRONT) OF AN OPERATOR'S COTTAGE ON SILK ...
11. SOUTH FACADE (FRONT) OF AN OPERATOR'S COTTAGE ON SILK STOCKING ROW. THESE COTTAGES WERE THE FIRST PERMANENT HOUSING CONSTRUCTED ON THE SKAGIT AND FOR MANY YEARS WERE CONSIDERED TO BE THE BEST. THEY WERE RESERVED FOR POWERHOUSE OPERATORS AND SUPERVISORS AND THEIR FAMILIES, 1989. - Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric Project, On Skagit River, Newhalem, Whatcom County, WA
2. CLOSEUP OF SOUTH FACADE OF UPPER FALLS GATE HOUSE, ...
2. CLOSEUP OF SOUTH FACADE OF UPPER FALLS GATE HOUSE, SHOWING TRASH RACKS, REMOVABLE STEEL DOORS, TRASH RAKE STRUCTURE, AND DERRICK, WINCH AND CABLE GATE LIFTING DEVICE, LOOKING SOUTH/SOUTHWEST. - Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
10. Turbine Pit of Unit 5, view to the north. ...
10. Turbine Pit of Unit 5, view to the north. Note the difference in configuration within this turbine pit as compared to one of the original pits illustrated in photograph number MT-105-A-11. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Kolkutin, V V; Ivanov, P L; Fetisov, V A; Afanas'ev, S A; Dorozhkin, O A; Vognerubov, R N; Kuznetsov, T L
2010-01-01
The authors illustrate positive experience in organization and coordination of joint actions of expert divisions of different sectors during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station in August 2009. Special emphasis is laid on the participation of experts of quick-reaction teams formed by territorial forensic medical bureaus, mobile and supporting forces from the adjacent regions.
Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bissell, Gael
1985-01-01
This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.
Solomon Gulch hydroelectric project takes shape
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The planning and current construction activities for the Solomon Gulch hydroelectric plant near Valdez, Alaska which is scheduled for dam completion in 1980 and power plant operation in 1981 are discussed. The main dam will be 115 ft high and 360 ft wide. The two paralled 48-in. dia penstocks will be constructed from surplus pipe left over from the Alaska pipeline project. Construction on the 12 MW plant began in October 1978. (LCL)
1. Photocopy of photograph, c. 1904. VIEW OF HONEYWOOD MILL ...
1. Photocopy of photograph, c. 1904. VIEW OF HONEYWOOD MILL SETTLEMENT AT DAM 5, ORIGINALLY ERECTED AS A FLOUR MILL IN THE 1830s, CONVERTED TO A PULP GRINDING MILL IN THE 1880; HYDROELECTRIC GENERATING EQUIPMENT INSTALLED BY MARTINSBURG POWER COMPANY IN 1904. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV
Eisenberg, Joseph N.S.; Trueba, Gabriel; Zhang, Lixin; Johnson, Timothy J.
2017-01-01
Summary: Small-scale food animal production is widely practiced around the globe, yet it is often overlooked in terms of the environmental health risks. Evidence suggests that small-scale food animal producers often employ the use of antimicrobials to improve the survival and growth of their animals, and that this practice leads to the development of antimicrobial resistance (AMR) that can potentially spread to humans. The nature of human–animal interactions in small-scale food animal production systems, generally practiced in and around the home, likely augments spillover events of AMR into the community on a scale that is currently unrecognized and deserves greater attention. https://doi.org/10.1289/EHP2116 PMID:29038091
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-04-06
The Itaipu hydroelectric project, a joint effort of Brazil and Paraguay (with a cost of US $16 to 18 billion), will be finished in December 1989. The project is situated on the Parana River, 14 km beyond the Puente de da Amistad (Friendship Bridge), which connects the city Presidente Stroessner, in Paraguay, with Foz do Iguacu, in Brazil. It is considered today not only the biggest hydroelectric plant in the world, but also a great socio-economic boom in the making. Itaipu will add a total of 12.6-million kilowatt-hours (kWh) of hydroelectricity to the region, an equivalent of 600,000 barrels ofmore » oil daily (b/d). This issue of Energy Detente reviews the progress of Itaipu. Also appearing in this issue is the fuel price/tax series and the principal industrial fuel prices for April 1983 for countries of the Eastern Hemisphere.« less
Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jack Q. Richardson
2012-06-28
Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project costmore » match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.« less
Research and Development of High-performance Explosives
Cornell, Rodger; Wrobel, Erik; Anderson, Paul E.
2016-01-01
Developmental testing of high explosives for military applications involves small-scale formulation, safety testing, and finally detonation performance tests to verify theoretical calculations. small-scale For newly developed formulations, the process begins with small-scale mixes, thermal testing, and impact and friction sensitivity. Only then do subsequent larger scale formulations proceed to detonation testing, which will be covered in this paper. Recent advances in characterization techniques have led to unparalleled precision in the characterization of early-time evolution of detonations. The new technique of photo-Doppler velocimetry (PDV) for the measurement of detonation pressure and velocity will be shared and compared with traditional fiber-optic detonation velocity and plate-dent calculation of detonation pressure. In particular, the role of aluminum in explosive formulations will be discussed. Recent developments led to the development of explosive formulations that result in reaction of aluminum very early in the detonation product expansion. This enhanced reaction leads to changes in the detonation velocity and pressure due to reaction of the aluminum with oxygen in the expanding gas products. PMID:26966969
1981-06-01
available information from Public Utilities comaissions responsible for establishing PURPA rates in each state. 1.4 PRINCIPAL FINDINGS The direct effect all... PURPA rates. However, many of those categorized as private and public developers are private and public utilities. This reflects the interest in hydro...The Public Utility Regulatory Policies Act ( PURPA ) of 1978 empowered FERC to prescribe rules requiring utilities to purchase power from and sell power
Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model
Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William
1982-01-01
The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reinemer, V.
Alaska's diverse systems for electric power include only 4% by private utilities. Large distances and small markets make transmission impractical for the most part. Rates are variable, although the state average is low. Energy sources, except nuclear, are abundant: half the US coal reserves are in Alaska. In addition, it has geothermal, tidal, biomass, solar, wind, and hydroelectric power. Energy construction and study programs are centered in the Alaska Power Authority and include using waste heat from village diesel generators. Hydro potential is good, but access, distances, and environmental effects must be considered. The Terror Lake, Tyee Lake, Swan Lake,more » and Susitna projects are described and transmission construction, including the 345-kW Railbelt intertie, is discussed. 1 figure.« less
ERIC Educational Resources Information Center
Tesfamariam, Gebrekidan Mebrahtu; Lykknes, Annette; Kvittingen, Lise
2017-01-01
In theory, practical work is an established part of university-level chemistry courses. However, mainly due to budget constraints, large class size, time constraints and inadequate teacher preparations, practical activities are frequently left out from chemistry classroom instruction in most developing countries. Small-scale chemistry (SSC)…
Multi-scale structures of turbulent magnetic reconnection
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nakamura, T. K. M., E-mail: takuma.nakamura@oeaw.ac.at; Nakamura, R.; Narita, Y.
2016-05-15
We have analyzed data from a series of 3D fully kinetic simulations of turbulent magnetic reconnection with a guide field. A new concept of the guide filed reconnection process has recently been proposed, in which the secondary tearing instability and the resulting formation of oblique, small scale flux ropes largely disturb the structure of the primary reconnection layer and lead to 3D turbulent features [W. Daughton et al., Nat. Phys. 7, 539 (2011)]. In this paper, we further investigate the multi-scale physics in this turbulent, guide field reconnection process by introducing a wave number band-pass filter (k-BPF) technique in whichmore » modes for the small scale (less than ion scale) fluctuations and the background large scale (more than ion scale) variations are separately reconstructed from the wave number domain to the spatial domain in the inverse Fourier transform process. Combining with the Fourier based analyses in the wave number domain, we successfully identify spatial and temporal development of the multi-scale structures in the turbulent reconnection process. When considering a strong guide field, the small scale tearing mode and the resulting flux ropes develop over a specific range of oblique angles mainly along the edge of the primary ion scale flux ropes and reconnection separatrix. The rapid merging of these small scale modes leads to a smooth energy spectrum connecting ion and electron scales. When the guide field is sufficiently weak, the background current sheet is strongly kinked and oblique angles for the small scale modes are widely scattered at the kinked regions. Similar approaches handling both the wave number and spatial domains will be applicable to the data from multipoint, high-resolution spacecraft observations such as the NASA magnetospheric multiscale (MMS) mission.« less
Multi-scale structures of turbulent magnetic reconnection
NASA Astrophysics Data System (ADS)
Nakamura, T. K. M.; Nakamura, R.; Narita, Y.; Baumjohann, W.; Daughton, W.
2016-05-01
We have analyzed data from a series of 3D fully kinetic simulations of turbulent magnetic reconnection with a guide field. A new concept of the guide filed reconnection process has recently been proposed, in which the secondary tearing instability and the resulting formation of oblique, small scale flux ropes largely disturb the structure of the primary reconnection layer and lead to 3D turbulent features [W. Daughton et al., Nat. Phys. 7, 539 (2011)]. In this paper, we further investigate the multi-scale physics in this turbulent, guide field reconnection process by introducing a wave number band-pass filter (k-BPF) technique in which modes for the small scale (less than ion scale) fluctuations and the background large scale (more than ion scale) variations are separately reconstructed from the wave number domain to the spatial domain in the inverse Fourier transform process. Combining with the Fourier based analyses in the wave number domain, we successfully identify spatial and temporal development of the multi-scale structures in the turbulent reconnection process. When considering a strong guide field, the small scale tearing mode and the resulting flux ropes develop over a specific range of oblique angles mainly along the edge of the primary ion scale flux ropes and reconnection separatrix. The rapid merging of these small scale modes leads to a smooth energy spectrum connecting ion and electron scales. When the guide field is sufficiently weak, the background current sheet is strongly kinked and oblique angles for the small scale modes are widely scattered at the kinked regions. Similar approaches handling both the wave number and spatial domains will be applicable to the data from multipoint, high-resolution spacecraft observations such as the NASA magnetospheric multiscale (MMS) mission.
Reynolds number trend of hierarchies and scale interactions in turbulent boundary layers.
Baars, W J; Hutchins, N; Marusic, I
2017-03-13
Small-scale velocity fluctuations in turbulent boundary layers are often coupled with the larger-scale motions. Studying the nature and extent of this scale interaction allows for a statistically representative description of the small scales over a time scale of the larger, coherent scales. In this study, we consider temporal data from hot-wire anemometry at Reynolds numbers ranging from Re τ ≈2800 to 22 800, in order to reveal how the scale interaction varies with Reynolds number. Large-scale conditional views of the representative amplitude and frequency of the small-scale turbulence, relative to the large-scale features, complement the existing consensus on large-scale modulation of the small-scale dynamics in the near-wall region. Modulation is a type of scale interaction, where the amplitude of the small-scale fluctuations is continuously proportional to the near-wall footprint of the large-scale velocity fluctuations. Aside from this amplitude modulation phenomenon, we reveal the influence of the large-scale motions on the characteristic frequency of the small scales, known as frequency modulation. From the wall-normal trends in the conditional averages of the small-scale properties, it is revealed how the near-wall modulation transitions to an intermittent-type scale arrangement in the log-region. On average, the amplitude of the small-scale velocity fluctuations only deviates from its mean value in a confined temporal domain, the duration of which is fixed in terms of the local Taylor time scale. These concentrated temporal regions are centred on the internal shear layers of the large-scale uniform momentum zones, which exhibit regions of positive and negative streamwise velocity fluctuations. With an increasing scale separation at high Reynolds numbers, this interaction pattern encompasses the features found in studies on internal shear layers and concentrated vorticity fluctuations in high-Reynolds-number wall turbulence.This article is part of the themed issue 'Toward the development of high-fidelity models of wall turbulence at large Reynolds number'. © 2017 The Author(s).
Parachute Dynamics Investigations Using a Sensor Package Airdropped from a Small-Scale Airplane
NASA Technical Reports Server (NTRS)
Dooley, Jessica; Lorenz, Ralph D.
2005-01-01
We explore the utility of various sensors by recovering parachute-probe dynamics information from a package released from a small-scale, remote-controlled airplane. The airdrops aid in the development of datasets for the exploration of planetary probe trajectory recovery algorithms, supplementing data collected from instrumented, full-scale tests and computer models.
NASA Astrophysics Data System (ADS)
Ando, T.; Kawasaki, A.; Koike, T.
2017-12-01
IPCC AR5 (2014) reported that rainfall in the middle latitudes of the Northern Hemisphere has been increasing since 1901, and it is claimed that warmer climate will increase the risk of floods. In contrast, world water demand is forecasted to exceed a sustainable supply by 40 percent by 2030. In order to avoid this expectable water shortage, securing new water resources has become an utmost challenge. However, flood risk prevention and the secure of water resources are contradictory. To solve this problem, we can use existing hydroelectric dams not only as energy resources but also for flood control. However, in case of Japan, hydroelectric dams take no responsibility for it, and benefits have not been discussed accrued by controlling flood by hydroelectric dams, namely by using preliminary water release from them. Therefore, our paper proposes methodology for assessing those benefits. This methodology has three stages as shown in Fig. 1. First, RRI model is used to model flood events, taking account of the probability of rainfall. Second, flood damage is calculated using assets in inundation areas multiplied by the inundation depths generated by that RRI model. Third, the losses stemming from preliminary water release are calculated, and adding them to flood damage, overall losses are calculated. We can evaluate the benefits by changing the volume of preliminary release. As a result, shown in Fig. 2, the use of hydroelectric dams to control flooding creates 20 billion Yen benefits, in the probability of three-day-ahead rainfall prediction of the assumed maximum rainfall in Oi River, in the Shizuoka Pref. of Japan. As the third priority in the Sendai Framework for Disaster Risk Reduction 2015-2030, `investing in disaster risk reduction for resilience - public and private investment in disaster risk prevention and reduction through structural and non-structural measures' was adopted. The accuracy of rainfall prediction is the key factor in maximizing the benefits. Therefore, if the accrued 20 billion Yen benefits by adopting this evaluation methodology are invested in improving rainfall prediction, the accuracy of the forecasts will increase and so will the benefits. This positive feedback loop will benefit society. The results of this study may stimulate further discussion on the role of hydroelectric dams in flood control.
African hot spot volcanism: small-scale convection in the upper mantle beneath cratons.
King, S D; Ritsema, J
2000-11-10
Numerical models demonstrate that small-scale convection develops in the upper mantle beneath the transition of thick cratonic lithosphere and thin oceanic lithosphere. These models explain the location and geochemical characteristics of intraplate volcanos on the African and South American plates. They also explain the presence of relatively high seismic shear wave velocities (cold downwellings) in the mantle transition zone beneath the western margin of African cratons and the eastern margin of South American cratons. Small-scale, edge-driven convection is an alternative to plumes for explaining intraplate African and South American hot spot volcanism, and small-scale convection is consistent with mantle downwellings beneath the African and South American lithosphere.
NASA Astrophysics Data System (ADS)
Parsons, R.; Barnhart, C. J.; Benson, S. M.
2013-12-01
Large-scale electrical energy storage could accommodate variable, weather dependent energy resources such as wind and solar. Pumped hydroelectric energy storage (PHS) and compressed energy storage area (CAES) have life cycle energy and financial costs that are an order of magnitude lower than conventional electrochemical storage technologies. However PHS and CAES storage technologies require specific geologic conditions. Conventional PHS requires an upper and lower reservoir separated by at least 100 m of head, but no more than 10 km in horizontal distance. Conventional PHS also impacts fresh water supplies, riparian ecosystems, and hydrologic environments. A PHS facility that uses the ocean as the lower reservoir benefits from a smaller footprint, minimal freshwater impact, and the potential to be located near off shore wind resources and population centers. Although technologically nascent, today one coastal PHS facility exists. The storage potential for coastal PHS is unknown. Can coastal PHS play a significant role in augmenting future power grids with a high faction of renewable energy supply? In this study we employ GIS-based topographic analysis to quantify the coastal PHS potential of several geographic locations, including California, Chile and Peru. We developed automated techniques that seek local topographic minima in 90 m spatial resolution shuttle radar topography mission (SRTM) digital elevation models (DEM) that satisfy the following criteria conducive to PHS: within 10 km from the sea; minimum elevation 150 m; maximum elevation 1000 m. Preliminary results suggest the global potential for coastal PHS could be very significant. For example, in northern Chile we have identified over 60 locations that satisfy the above criteria. Two of these locations could store over 10 million cubic meters of water or several GWh of energy. We plan to report a global database of candidate coastal PHS locations and to estimate their energy storage capacity.
NASA Astrophysics Data System (ADS)
Jacobson, M. Z.
2016-12-01
Global warming, air pollution, and energy insecurity are three of the most significant problems facing the world today. Can these problems be solved with existing technologies implemented on a large scale or do we need to wait for a miracle technology? This talk discusses the development of technical and economic plans to convert the energy infrastructure of each of 139 countries of the world to those powered by 100% wind, water, and sunlight (WWS) for all purposes using existing technology along with efficiency measures. All purposes includes electricity, transportation, heating/cooling, industry, and agriculture/forestry/fishing. The roadmaps propose using existing WWS generator technologies along with existing electrical transportation, heating/cooling, and industrial devices and appliances, plus existing electricity storage technologies, (CSP with storage, pumped hydroelectric storage, and existing hydroelectric power) and existing heat/cold storage technologies (water, ice, and rocks) for the transitions. They envision 80% conversion to WWS by 2030 and 100% by 2050. WWS not only replaces business-as-usual (BAU) power, but also reduces 2050 BAU demand due to the higher work to energy ratio of WWS electricity over combustion, the elimination of energy for mining, transporting, and processing fuels, and improvements in end-use efficiency beyond BAU. The study examines job creation versus loss, land use requirements, air pollution mortality and morbidity cost differences, and global warming cost differences due to the conversion in each country. Results suggest that implementing these roadmaps will stabilize energy prices because fuel costs are zero; reduce international conflict by creating energy-independent countries; reduce energy poverty; reduce power disruption by decentralizing power; and avoid exploding CO2 levels. Thus, the study concludes that a 100% WWS transition provides at least one solution to global warming Please see http://web.stanford.edu/group/efmh/jacobson/Articles/I/WWS-50-USState-plans.html for more information.
Ensemble Kalman filters for dynamical systems with unresolved turbulence
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grooms, Ian, E-mail: grooms@cims.nyu.edu; Lee, Yoonsang; Majda, Andrew J.
Ensemble Kalman filters are developed for turbulent dynamical systems where the forecast model does not resolve all the active scales of motion. Coarse-resolution models are intended to predict the large-scale part of the true dynamics, but observations invariably include contributions from both the resolved large scales and the unresolved small scales. The error due to the contribution of unresolved scales to the observations, called ‘representation’ or ‘representativeness’ error, is often included as part of the observation error, in addition to the raw measurement error, when estimating the large-scale part of the system. It is here shown how stochastic superparameterization (amore » multiscale method for subgridscale parameterization) can be used to provide estimates of the statistics of the unresolved scales. In addition, a new framework is developed wherein small-scale statistics can be used to estimate both the resolved and unresolved components of the solution. The one-dimensional test problem from dispersive wave turbulence used here is computationally tractable yet is particularly difficult for filtering because of the non-Gaussian extreme event statistics and substantial small scale turbulence: a shallow energy spectrum proportional to k{sup −5/6} (where k is the wavenumber) results in two-thirds of the climatological variance being carried by the unresolved small scales. Because the unresolved scales contain so much energy, filters that ignore the representation error fail utterly to provide meaningful estimates of the system state. Inclusion of a time-independent climatological estimate of the representation error in a standard framework leads to inaccurate estimates of the large-scale part of the signal; accurate estimates of the large scales are only achieved by using stochastic superparameterization to provide evolving, large-scale dependent predictions of the small-scale statistics. Again, because the unresolved scales contain so much energy, even an accurate estimate of the large-scale part of the system does not provide an accurate estimate of the true state. By providing simultaneous estimates of both the large- and small-scale parts of the solution, the new framework is able to provide accurate estimates of the true system state.« less
ERIC Educational Resources Information Center
Development Planning and Research Associates, Inc., Manhattan, KS.
This manual provides materials for a two-week inservice training program for Peace Corps volunteers on the planning, construction, and operation and maintenance of small-scale irrigation systems. The workshop is designed to be given by two experienced professionals: one with practical knowledge of irrigation system design, operation, and…
Noise characteristics of upper surface blown configurations. Experimental program and results
NASA Technical Reports Server (NTRS)
Brown, W. H.; Searle, N.; Blakney, D. F.; Pennock, A. P.; Gibson, J. S.
1977-01-01
An experimental data base was developed from the model upper surface blowing (USB) propulsive lift system hardware. While the emphasis was on far field noise data, a considerable amount of relevant flow field data were also obtained. The data were derived from experiments in four different facilities resulting in: (1) small scale static flow field data; (2) small scale static noise data; (3) small scale simulated forward speed noise and load data; and (4) limited larger-scale static noise flow field and load data. All of the small scale tests used the same USB flap parts. Operational and geometrical variables covered in the test program included jet velocity, nozzle shape, nozzle area, nozzle impingement angle, nozzle vertical and horizontal location, flap length, flap deflection angle, and flap radius of curvature.
Impact of aggregation on scaling behavior of Internet backbone traffic
NASA Astrophysics Data System (ADS)
Zhang, Zhi-Li; Ribeiro, Vinay J.; Moon, Sue B.; Diot, Christophe
2002-07-01
We study the impact of aggregation on the scaling behavior of Internet backbone tra ffic, based on traces collected from OC3 and OC12 links in a tier-1 ISP. We make two striking observations regarding the sub-second small time scaling behaviors of Internet backbone traffic: 1) for a majority of these traces, the Hurst parameters at small time scales (1ms - 100ms) are fairly close to 0.5. Hence the traffic at these time scales are nearly uncorrelated; 2) the scaling behaviors at small time scales are link-dependent, and stay fairly invariant over changing utilization and time. To understand the scaling behavior of network traffic, we develop analytical models and employ them to demonstrate how traffic composition -- aggregation of traffic with different characteristics -- affects the small-time scalings of network traffic. The degree of aggregation and burst correlation structure are two major factors in traffic composition. Our trace-based data analysis confirms this. Furthermore, we discover that traffic composition on a backbone link stays fairly consistent over time and changing utilization, which we believe is the cause for the invariant small-time scalings we observe in the traces.
ERIC Educational Resources Information Center
Gentry, Curtis
This French-language manual is designed to assist Peace Corps volunteers in French-speaking countries in the implementation of small-scale beekeeping programs as a tool for development. Addressed in the individual chapters are bees and humans; project planning; the types and habits of bees; the essence of beekeeping; bee space and beehives;…
16. Bus Room (also known as Switch Gear Room), view ...
16. Bus Room (also known as Switch Gear Room), view to the southeast. An air circuit breaker compressor (visible in photograph number 2) was once attached to the main bus relay visible in the background of the photograph. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
Snow mapping from space platforms
NASA Technical Reports Server (NTRS)
Itten, K. I.
1980-01-01
The paper considers problems of optimum resolution, periodicity, and wavelength bands used for snow mapping. Analog and digital methods were used for application of satellite data; techniques were developed for producing steamflow forecasts, hydroelectric power generation regulation data, irrigation potentials, and information on the availability of drinking water supplies. Future systems will utilize improved spectral band selection, new spectral regions, higher repetition rates, and more rapid access to satellite data.
9. Water Purification System and Instrument Air Receiver Tank, view ...
9. Water Purification System and Instrument Air Receiver Tank, view to the south. The water purification system is visible in the right foreground of the photograph and the instrument air receiver tank is visible in the right background of the photograph. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
Snake River Sockeye Salmon Habitat and Limnological Research; 1995 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Teuscher, David; Taki, Doug
1996-05-01
This report contains studies which are part of the Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. Attention is focused on population monitoring studies in the Sawtooth Valley Lakes. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.
Generating Excitement: Build Your Own Generator to Study the Transfer of Energy
ERIC Educational Resources Information Center
Fletcher, Kurt; Rommel-Esham, Katie; Farthing, Dori; Sheldon, Amy
2011-01-01
The transfer of energy from one form to another can be difficult to understand. The electrical energy that turns on a lamp may come from the burning of coal, water falling at a hydroelectric plant, nuclear reactions, or gusts of wind caused by the uneven heating of the Earth. The authors have developed and tested an exciting hands-on activity to…
11. Turbine Pit and Shaft of Unit 1, view to ...
11. Turbine Pit and Shaft of Unit 1, view to the south, with operating ring at base of shaft and servo motor arms in foreground and in left background recess. Turbine monitoring and auxiliary equipment is located in the rightbackground recess. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
1. GUEST HOUSE KNOWN AS 'THE LODGE' REPORTEDLY BUILT TO ...
1. GUEST HOUSE KNOWN AS 'THE LODGE' REPORTEDLY BUILT TO BE USED BY J.D. ROSS ON HIS VISITS TO THE SKAGIT PROJECT. DURING THE 1930S THE U.S. FOREST SERVICE EXERTED A STONG INFLUENCE ON BUILDING STYLES FOR RESIDENCES AT THE SKAGIT PROJECT, 1989. - Skagit Power Development, Skagit River & Newhalem Creek Hydroelectric Project, On Skagit River, Newhalem, Whatcom County, WA
Analysis of the costs of fuel supply for wood-fired electric power plants in rural Liberia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Perlack, R.D.; Barron, W.F.; Samuels, G.
1985-06-01
In recent years the quality of rural electric services in Liberia has been declining and the future economic viability of these power stations is a growing concern. Each of the ten operating and each of the planned rural public power stations is designed to operate exclusively on gas oil (diesel fuel). Fuel expenditures by the Liberian Electricity Corporation (LEC) for the rural public stations represent a major and growing burden on the financially hardpressed utility. Liberia has two potentially significant alternatives to oil-fired electric power for its up-country towns: small (1 to 5 MW) hydroelectric facilities, and wood-fired steam ormore » gasifier plants (0.2 to 2 MW). Although small hydroelectric facilities appear viable for several locations, they cannot serve all locations and will require thermal back-up. The economics of supplying wood to a rural electric power plant or rural grid were evaluated under several scenarios involving: (1) different sources of the feedstock, and (2) differences in wood supply requirements for plants based on the use of steam or gasifier technology, and variation in the utilization level for such plants. With a few minor exceptions, wood energy supplies are plentiful throughout Liberia. Liberia has four different potential sources of wood fuel supply: the commercial cutting of retired rubber trees; the harvesting of secondary growth forest just prior to the land returning to temporary cultivation as part of a system of shifting agriculture; adding to the system of shifting agriculture the planting of fast-growing wood species and harvesting these trees when the land again is brought back under cultivation (generally after about five to seven years); and the establishment of commercial short-rotation wood energy plantations. Results indicate that the use of wood to fuel rural power stations is a viable economic option.« less
Water Footprint of Hydroelectricity: A Case Study of Two Large Canadian Boreal Watersheds
NASA Astrophysics Data System (ADS)
Irambona, C.; Music, B.; Nadeau, D.; Mahdi, T. F.; Strachan, I. B.
2015-12-01
20% of Canada's total freshwater is located in the province of Quebec, where 30% of the country's energy is produced from hydropower. Hydroelectric generation uses a considerable amount of water through evaporation from the reservoirs. The blue water footprint is an indicator of the annual freshwater consumption related to hydropower production. Although environmental effects of reservoir impounding have been previously investigated, their impacts on local and regional evapotranspiration are still not well understood due to the lack of long-term observation data. This study aims to assess the blue water footprint of two large hydroelectric systems located in the Canadian boreal forest. To do so, we use hydro-meteorological data from two specially designed climate simulations (a 'no-reservoir' and a 'post-impoundment' simulation) performed by the fifth generation of the Canadian Regional Climate Model (CRCM5) driven by the ERA-Interim reanalysis. Land-surface processes in the CRCM5 are parameterized by the Canadian Land Surface Scheme (CLASS V3.6), while surface fluxes over the water bodies are simulated by the 1-D lake model (Flake). A 'no-reservoir' and a 'post-impoundment' simulation are carried by adjusting the water fraction on the reservoir grids. Both simulations cover a 42 years period (1970-2012) at 0.11° horizontal resolution, consisting of 300 x 300 grid points centered on the province of Quebec. The two watersheds under study (200 000 km² total) are located in Northern Quebec (49-54°N), Canada, where more than 42% of the province power generation capacity is installed with eight reservoirs covering a total area of 10 000 km². A first validation of the 'post-impoundment' simulation is performed using micrometeorological ground observations, complemented with available hydro-meteorological data from Environment Canada weather stations. Then, each reservoir water footprint is calculated using the 'post-impoundment' simulation. Finally, the net evapotranspiration and the pre and post impoundment water budgets are assessed on the watershed scale. Results from this study are expected to be useful for water resources management in Quebec and other similar boreal environments.
A hysteretic model considering Stribeck effect for small-scale magnetorheological damper
NASA Astrophysics Data System (ADS)
Zhao, Yu-Liang; Xu, Zhao-Dong
2018-06-01
Magnetorheological (MR) damper is an ideal semi-active control device for vibration suppression. The mechanical properties of this type of devices show strong nonlinear characteristics, especially the performance of the small-scale dampers. Therefore, developing an ideal model that can accurately describe the nonlinearity of such device is crucial to control design. In this paper, the dynamic characteristics of a small-scale MR damper developed by our research group is tested, and the Stribeck effect is observed in the low velocity region. Then, an improved model based on sigmoid model is proposed to describe this Stribeck effect observed in the experiment. After that, the parameters of this model are identified by genetic algorithms, and the mathematical relationship between these parameters and the input current, excitation frequency and amplitude is regressed. Finally, the predicted forces of the proposed model are validated with the experimental data. The results show that this model can well predict the mechanical properties of the small-scale damper, especially the Stribeck effect in the low velocity region.
Kawarazuka, Nozomi; Locke, Catherine; McDougall, Cynthia; Kantor, Paula; Morgan, Miranda
2017-03-01
The demand for gender analysis is now increasingly orthodox in natural resource programming, including that for small-scale fisheries. Whilst the analysis of social-ecological resilience has made valuable contributions to integrating social dimensions into research and policy-making on natural resource management, it has so far demonstrated limited success in effectively integrating considerations of gender equity. This paper reviews the challenges in, and opportunities for, bringing a gender analysis together with social-ecological resilience analysis in the context of small-scale fisheries research in developing countries. We conclude that rather than searching for a single unifying framework for gender and resilience analysis, it will be more effective to pursue a plural solution in which closer engagement is fostered between analysis of gender and social-ecological resilience whilst preserving the strengths of each approach. This approach can make an important contribution to developing a better evidence base for small-scale fisheries management and policy.
Vakalis, Stergios; Patuzzi, Francesco; Baratieri, Marco
2016-04-01
Modeling can be a powerful tool for designing and optimizing gasification systems. Modeling applications for small scale/fixed bed biomass gasifiers have been interesting due to their increased commercial practices. Fixed bed gasifiers are characterized by a wide range of operational conditions and are multi-zoned processes. The reactants are distributed in different phases and the products from each zone influence the following process steps and thus the composition of the final products. The present study aims to improve the conventional 'Black-Box' thermodynamic modeling by means of developing multiple intermediate 'boxes' that calculate two phase (solid-vapor) equilibriums in small scale gasifiers. Therefore the model is named ''Multi-Box''. Experimental data from a small scale gasifier have been used for the validation of the model. The returned results are significantly closer with the actual case study measurements in comparison to single-stage thermodynamic modeling. Copyright © 2016 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The Bonneville Power Administration is a federal nonprofit power marketing administration based in the Pacific Northwest . Although BPA is part of the U .S . Department of Energy, it is self-funding and covers its costs by selling its products and services . BPA markets wholesale electrical power from 31 federal hydro projects in the Columbia River Basin, one nonfederal nuclear plant and several small nonfederal power plants . The dams are operated by the U .S . Army Corps of Engineers and the Bureau of Reclamation . About 30 percent of the electric power used in the Northwest comesmore » from BPA . BPA’s resources — primarily hydroelectric — make its power nearly carbon free . BPA also operates and maintains about three- fourths of the high-voltage transmission in its service territory . BPA’s service territory includes Idaho, Oregon, Washington, western Montana and small parts of eastern Montana, California, Nevada, Utah and Wyoming . BPA promotes energy efficiency, renewable resources and new technologies that improve its ability to deliver on its mission . BPA also funds regional efforts to protect and enhance fish and wildlife populations affected by hydropower development in the Columbia River Basin . BPA is committed to public service and seeks to make its decisions in a manner that provides opportunities for input from stakeholders . In its vision statement, BPA dedicates itself to providing high system reliability, low rates consistent with sound business principles, environmental stewardship and accountability« less
Gornostaeva, R M
1999-01-01
Among females and larvae of mosquitoes collected in 1969, 1981-1984 in the area of the Sayan-Shushenskoe hydroelectric power station (140 km up the Yenisei River from the Abakan city) 5 genera and 30 species were recorded. Based on recent collections and reference data (Gornostaeva e. a., 1969; Gornostaeva, Danilov, 1986) the fauna of the region in question includes 31 species of mosquitoes (Anopheles--1, Culiseta--2, Coquillettidia--1, Aedes--22, Culex--5).
NASA Astrophysics Data System (ADS)
Kilic, Gokhan; Eren, Levent
2018-04-01
This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.
Bakken, Tor Haakon; Aase, Anne Guri; Hagen, Dagmar; Sundt, Håkon; Barton, David N; Lujala, Päivi
2014-07-01
Climate change and the needed reductions in the use of fossil fuels call for the development of renewable energy sources. However, renewable energy production, such as hydropower (both small- and large-scale) and wind power have adverse impacts on the local environment by causing reductions in biodiversity and loss of habitats and species. This paper compares the environmental impacts of many small-scale hydropower plants with a few large-scale hydropower projects and one wind power farm, based on the same set of environmental parameters; land occupation, reduction in wilderness areas (INON), visibility and impacts on red-listed species. Our basis for comparison was similar energy volumes produced, without considering the quality of the energy services provided. The results show that small-scale hydropower performs less favourably in all parameters except land occupation. The land occupation of large hydropower and wind power is in the range of 45-50 m(2)/MWh, which is more than two times larger than the small-scale hydropower, where the large land occupation for large hydropower is explained by the extent of the reservoirs. On all the three other parameters small-scale hydropower performs more than two times worse than both large hydropower and wind power. Wind power compares similarly to large-scale hydropower regarding land occupation, much better on the reduction in INON areas, and in the same range regarding red-listed species. Our results demonstrate that the selected four parameters provide a basis for further development of a fair and consistent comparison of impacts between the analysed renewable technologies. Copyright © 2014 The Authors. Published by Elsevier Ltd.. All rights reserved.
Logan, Malcolm H.; Burton, Lynn R.
1967-01-01
The March 27, 1964, Alaska earthquake and its associated aftershocks caused damage requiring several million dollars worth of repair to the Eklwtna Hydroelectric Project, 34 miles northeast of Anchorage. Electric service from the Eklutna powerplant was interrupted during the early phase of the March 27 earthquake, built was restored (intermittently) until May 9,1964, when the plant was closed for inspection and repair. Water for Eklutna project is transported from Eklutna Lake to the powerplant at tidewater on Knik Arm of Cook Inlet by an underwater intake connected to a 4.46-mile tunnel penstock. The primary damage caused by the earthquake was 1at the intake structure in Eklutna Lake. No damage to the power tunnel was observed. The piles-supported powerplant and appurtenant structures, Anchorage and Palmer substations, and the transmission lines suffered minor dammage. Most damage occurred to facilities constructed on un-consolidated sediments and overburden which densified and subsided during the earthquake. Structures built on bedrock experienced little or no damage. Underground communication and electrical systems in Anchorage were examined with a small-diameter television camera to locate damaged areas requiring repair. Most of the damage was concentrated at or near valley slopes. Those parts of the systems within the major slide areas of the city were destroyed.
Managing the Socioeconomic Impacts of Energy Development. A Guide for the Small Community.
ERIC Educational Resources Information Center
Armbrust, Roberta
Decisions concerning large-scale energy development projects near small communities or in predominantly rural areas are usually complex, requiring cooperation of all levels of government, as well as the general public and the private sector. It is unrealistic to expect the typical small community to develop capabilities to independently evaluate a…
ERIC Educational Resources Information Center
Gentry, Curtis
This Spanish-language manual is designed to assist Peace Corps volunteers in Spanish-speaking countries in the implementation of small-scale beekeeping programs as a tool for development. Addressed in the individual chapters are bees and humans; project planning; the types and habits of bees; the essence of beekeeping; bee space and beehives;…
Small-scale fisheries bycatch jeopardizes endangered Pacific loggerhead turtles.
Peckham, S Hoyt; Maldonado Diaz, David; Walli, Andreas; Ruiz, Georgita; Crowder, Larry B; Nichols, Wallace J
2007-10-17
Although bycatch of industrial-scale fisheries can cause declines in migratory megafauna including seabirds, marine mammals, and sea turtles, the impacts of small-scale fisheries have been largely overlooked. Small-scale fisheries occur in coastal waters worldwide, employing over 99% of the world's 51 million fishers. New telemetry data reveal that migratory megafauna frequent coastal habitats well within the range of small-scale fisheries, potentially producing high bycatch. These fisheries occur primarily in developing nations, and their documentation and management are limited or non-existent, precluding evaluation of their impacts on non-target megafauna. 30 North Pacific loggerhead turtles that we satellite-tracked from 1996-2005 ranged oceanwide, but juveniles spent 70% of their time at a high use area coincident with small-scale fisheries in Baja California Sur, Mexico (BCS). We assessed loggerhead bycatch mortality in this area by partnering with local fishers to 1) observe two small-scale fleets that operated closest to the high use area and 2) through shoreline surveys for discarded carcasses. Minimum annual bycatch mortality in just these two fleets at the high use area exceeded 1000 loggerheads year(-1), rivaling that of oceanwide industrial-scale fisheries, and threatening the persistence of this critically endangered population. As a result of fisher participation in this study and a bycatch awareness campaign, a consortium of local fishers and other citizens are working to eliminate their bycatch and to establish a national loggerhead refuge. Because of the overlap of ubiquitous small-scale fisheries with newly documented high-use areas in coastal waters worldwide, our case study suggests that small-scale fisheries may be among the greatest current threats to non-target megafauna. Future research is urgently needed to quantify small-scale fisheries bycatch worldwide. Localizing coastal high use areas and mitigating bycatch in partnership with small-scale fishers may provide a crucial solution toward ensuring the persistence of vulnerable megafauna.
Small-Scale Fisheries Bycatch Jeopardizes Endangered Pacific Loggerhead Turtles
Peckham, S. Hoyt; Diaz, David Maldonado; Walli, Andreas; Ruiz, Georgita; Crowder, Larry B.; Nichols, Wallace J.
2007-01-01
Background Although bycatch of industrial-scale fisheries can cause declines in migratory megafauna including seabirds, marine mammals, and sea turtles, the impacts of small-scale fisheries have been largely overlooked. Small-scale fisheries occur in coastal waters worldwide, employing over 99% of the world's 51 million fishers. New telemetry data reveal that migratory megafauna frequent coastal habitats well within the range of small-scale fisheries, potentially producing high bycatch. These fisheries occur primarily in developing nations, and their documentation and management are limited or non-existent, precluding evaluation of their impacts on non-target megafauna. Principal Findings/Methodology 30 North Pacific loggerhead turtles that we satellite-tracked from 1996–2005 ranged oceanwide, but juveniles spent 70% of their time at a high use area coincident with small-scale fisheries in Baja California Sur, Mexico (BCS). We assessed loggerhead bycatch mortality in this area by partnering with local fishers to 1) observe two small-scale fleets that operated closest to the high use area and 2) through shoreline surveys for discarded carcasses. Minimum annual bycatch mortality in just these two fleets at the high use area exceeded 1000 loggerheads year−1, rivaling that of oceanwide industrial-scale fisheries, and threatening the persistence of this critically endangered population. As a result of fisher participation in this study and a bycatch awareness campaign, a consortium of local fishers and other citizens are working to eliminate their bycatch and to establish a national loggerhead refuge. Conclusions/Significance Because of the overlap of ubiquitous small-scale fisheries with newly documented high-use areas in coastal waters worldwide, our case study suggests that small-scale fisheries may be among the greatest current threats to non-target megafauna. Future research is urgently needed to quantify small-scale fisheries bycatch worldwide. Localizing coastal high use areas and mitigating bycatch in partnership with small-scale fishers may provide a crucial solution toward ensuring the persistence of vulnerable megafauna. PMID:17940605
Yang, Yong-Hong; Yang, Jun-Xing; Pan, Xiao-Fu; Zhou, Wei; Yang, Mei-Lin
2011-04-01
Hydroelectric developments can result in a number of negative environmental consequences. Conservation aquaculture is a branch of science derived from conservation and population recovery studies on endangered fishes. Here we discuss the impacts on fishes caused by hydropower projects in Lixianjiang, and evaluate effects and problems on the propagation of Parazacco spilurus, Hemibagrus pluriradiatus, Neolissochilus benasi and Semilabeo obscurus. A successful propagation project includes foraging ecology in fields, pond cultivation, juvenile fish raising, prevention and curing on fish disease, genetic management, artificial releasing and population monitoring. Artificial propagation is the practicable act on genetic intercommunication, preventing population deterioration for fishes in upper and lower reaches of the dam. For long-term planning, fish stocks are not suitable for many kind of fishes, but can prevent fishes from going extinct in the wild. Basic data collection on fish ecology, parent fish hunting, prevention on fish disease are the most important factors on artificial propagation. Strengthening the genetic management of stock population for keeping a higher genetic diversity can increase the success of stock enhancement. The works on Lixianjiang provide a new model for river fish protection. To make sure the complicated project works well, project plans, commission contracts, base line monitoring and techniques on artificial reproduction must be considered early. Last, fishery conservation should be considered alongside location development.
Ulrich, Werner; Piwczyński, Marcin; Zaplata, Markus Klemens; Winter, Susanne; Schaaf, Wolfgang; Fischer, Anton
2014-07-01
During early plant succession, the phylogenetic structure of a community changes in response to important environmental filters and emerging species interactions. We traced the development of temperate-zone plant communities during the first 7 years of primary succession on catchment soils to explore patterns of initial species assembly. We found pronounced small-scale differences in the phylogenetic composition of neighbouring plant assemblages and a large-scale trend towards phylogenetic evenness. This small-scale variability appears to be mediated by soil properties, particularly carbonate content. Therefore, abiotic environmental conditions might counteract or even supersede the effects of interspecific competition among closely related species, which are usually predicted to exhibit patterns of phylogenetic evenness. We conclude that theories on phylogenetic community composition need to incorporate effects of small-scale variability of environmental factors.
Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.
Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S
2012-12-01
The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance. © 2012 The Society for Vector Ecology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kreutz, Thomas G; Ogden, Joan M
2000-07-01
In the final report, we present results from a technical and economic assessment of residential scale PEM fuel cell power systems. The objectives of our study are to conceptually design an inexpensive, small-scale PEMFC-based stationary power system that converts natural gas to both electricity and heat, and then to analyze the prospective performance and economics of various system configurations. We developed computer models for residential scale PEMFC cogeneration systems to compare various system designs (e.g., steam reforming vs. partial oxidation, compressed vs. atmospheric pressure, etc.) and determine the most technically and economically attractive system configurations at various scales (e.g., singlemore » family, residential, multi-dwelling, neighborhood).« less
Applying systems engineering methodologies to the micro- and nanoscale realm
NASA Astrophysics Data System (ADS)
Garrison Darrin, M. Ann
2012-06-01
Micro scale and nano scale technology developments have the potential to revolutionize smart and small systems. The application of systems engineering methodologies that integrate standalone, small-scale technologies and interface them with macro technologies to build useful systems is critical to realizing the potential of these technologies. This paper covers the expanding knowledge base on systems engineering principles for micro and nano technology integration starting with a discussion of the drivers for applying a systems approach. Technology development on the micro and nano scale has transition from laboratory curiosity to the realization of products in the health, automotive, aerospace, communication, and numerous other arenas. This paper focuses on the maturity (or lack thereof) of the field of nanosystems which is emerging in a third generation having transitioned from completing active structures to creating systems. The emphasis of applying a systems approach focuses on successful technology development based on the lack of maturity of current nano scale systems. Therefore the discussion includes details relating to enabling roles such as product systems engineering and technology development. Classical roles such as acquisition systems engineering are not covered. The results are also targeted towards small-scale technology developers who need to take into account systems engineering processes such as requirements definition, verification, and validation interface management and risk management in the concept phase of technology development to maximize the likelihood of success, cost effective micro and nano technology to increase the capability of emerging deployed systems and long-term growth and profits.
Designing of network planning system for small-scale manufacturing
NASA Astrophysics Data System (ADS)
Kapulin, D. V.; Russkikh, P. A.; Vinnichenko, M. V.
2018-05-01
The paper presents features of network planning in small-scale discrete production. The procedure of explosion of the production order, considering multilevel representation, is developed. The software architecture is offered. Approbation of the network planning system is carried out. This system allows carrying out dynamic updating of the production plan.
Environmentally Sound Small-Scale Water Projects. Guidelines for Planning.
ERIC Educational Resources Information Center
Tillman, Gus
This manual is the second volume in a series of publications on community development programs. Guidelines are suggested for small-scale water projects that would benefit segments of the world's urban or rural poor. Strategies in project planning, implementation and evaluation are presented that emphasize environmental conservation and promote…
SMALL SCALE BIOMASS FUELED GAS TURBINE ENGINE
A new generation of small scale (less than 20 MWe) biomass fueled, power plants are being developed based on a gas turbine (Brayton cycle) prime mover. These power plants are expected to increase the efficiency and lower the cost of generating power from fuels such as wood. The n...
A stochastic two-scale model for pressure-driven flow between rough surfaces
Larsson, Roland; Lundström, Staffan; Wall, Peter; Almqvist, Andreas
2016-01-01
Seal surface topography typically consists of global-scale geometric features as well as local-scale roughness details and homogenization-based approaches are, therefore, readily applied. These provide for resolving the global scale (large domain) with a relatively coarse mesh, while resolving the local scale (small domain) in high detail. As the total flow decreases, however, the flow pattern becomes tortuous and this requires a larger local-scale domain to obtain a converged solution. Therefore, a classical homogenization-based approach might not be feasible for simulation of very small flows. In order to study small flows, a model allowing feasibly-sized local domains, for really small flow rates, is developed. Realization was made possible by coupling the two scales with a stochastic element. Results from numerical experiments, show that the present model is in better agreement with the direct deterministic one than the conventional homogenization type of model, both quantitatively in terms of flow rate and qualitatively in reflecting the flow pattern. PMID:27436975
Bello, Mufutau Opeyemi; Solarin, Sakiru Adebola; Yen, Yuen Yee
2018-08-01
The primary objective of this paper is to investigate the isolated impacts of hydroelectricity consumption on the environment in Malaysia as an emerging economy. We use four different measures of environmental degradation including ecological footprint, carbon footprint, water footprint and CO 2 emission as target variables, while controlling for GDP, GDP square and urbanization for the period 1971 to 2016. A recently introduced unit root test with breaks is utilized to examine the stationarity of the series and the bounds testing approach to cointegration is used to probe the long run relationships between the variables. VECM Granger causality technique is employed to examine the long-run causal dynamics between the variables. Sensitivity analysis is conducted by further including fossil fuels in the equations. The results show evidence of an inverted U-shaped relationship between environmental degradation and real GDP. Hydroelectricity is found to significantly reduce environmental degradation while urbanization is also not particularly harmful on the environment apart from its effect on air pollution. The VECM Granger causality results show evidence of unidirectional causality running from hydroelectricity and fossil fuels consumption to all measures of environmental degradation and real GDP per capita. There is evidence of feedback hypothesis between real GDP to all environmental degradation indices. The inclusion of fossil fuel did not change the behavior of hydroelectricity on the environment but fossil fuels significantly increase water footprint. Copyright © 2018 Elsevier Ltd. All rights reserved.
Rodrigures, Moreno S; Batista, Elis P; Silva, Alexandre A; Costa, Fábio M; Neto, Verissimo A S; Gil, Luiz Herman S
2017-02-22
Anopheles mosquitoes are the only vectors of human malaria. Anopheles species use standing water as breeding sites. Human activities, like the creation of an artificial lake during the implementation of hydroelectric power plants, lead to changes in environmental characteristics and, therefore, may changes the species richness and composition of Anopheles mosquitoes. The aim of the present study was to verify whether or not there is an association between the artificial flooding resulting from the construction of the Jirau hydroelectric power plant, and the richness and composition of anophelines. Mosquitoes samples were obtained monthly from the Jirau hydroelectric power plant area located at Porto Velho, Rondônia State, using Human Landing Catch (06:00-10:00 PM). Mosquitoes collected were transported to Laboratório de Entomologia Médica FIOCRUZ-RO where they were identified until species using dichotomous key. A total of 6347 anophelines belonging to eight different species were collected. The anophelines species richness was significantly lower during the first flooding stage. Differences in anophelines species composition were found when comparing the first flooding stage with the other stages. Furthermore, the mean number of Anopheles darlingi, the main vector of malaria in the region, increases during the first and the third flooding stages. The continual monitoring of these vectors during the late operational phase may be useful in order to understand how anophelines will behave in this area.
Sedimentation Survey of Lago Guerrero, Puerto Rico, May 2001
Soler-López, Luis R.
2002-01-01
Lago Guerrero, a small reservoir owned by the Puerto Rico Electric Power Authority, is part of the Isabela Hydroelectric System and is located in Aguadilla, in northwestern Puerto Rico. The reservoir had a storage capacity of about 127,376 cubic meters in May 2001 and a maximum depth of about 5.8 meters. Records on dam construction and original topography and storage capacity were not available; therefore, sedimentation rates could not be determined. However, Lago Guerrero resumably was constructed during the 1930?s because it receives water from lago Guajataca, which was constructed in 1928. The May 2001 bathymetric survey of Lago Guerrero established baseline data that are essential to calculate sedimentation rates, sediment yields, storage loss, and sediment deposition sites within the reservoir.
NASA Astrophysics Data System (ADS)
Peviani, Maximo; Alterach, Julio; Danelli, Andrea
2010-05-01
The three years SEE HYDROPOWER project started on June 2009, financed by the South-East Transnational Cooperation Programme (EU), aims to a sustainable exploitation of water concerning hydropower production in SEE countries, looking up to renewable energy sources development, preserving environmental quality and preventing flood risk. Hydropower is the most important renewable resource for energy production in the SEE countries but creates ecological impacts on a local scale. If on one hand, hydroelectric production has to be maintained and likely increased following the demand trend and RES-e Directive, on the other hand, hydropower utilisation often involves severe hydrological changes, damages the connectivity of water bodies and injures river ecosystems. The project gives a strong contribution to the integration between the Water Frame and the RES-e Directives in the involved countries. The SEE HYDROPOWER project promotes the optimal use of water, as multiple natural resources, in order to face the increasing regional electrical-energy demand. Furthermore, SEE HYDROPOWER defines specific needs and test methodologies & tools, in order to help public bodies to take decisions about planning and management of water and hydropower concessions, considering all multi-purposes uses, taking into account the environmental sustainability of natural resources and flooding risks. Investigations is carried on to define common strategies & methods for preserving river with particular concerns to aquatic ecosystems, considering the required Minimum Environmental Flow, macro-habitat quality, migratory fishes and related environmental issues. Other problem addressed by the Project is the contrast between Public Administration and Environmental associations on one side and the Hydropower producers on the other side, for the exploitation of water bodies. Competition between water users (for drinking, irrigation, industrial processes, power generation, etc.) is becoming a serious problem, and there is a strong need of a more accurate planning and management optimization of the resources. The partnership includes a well balance mixing of public administrations, agencies ruling hydropower development, water bodies conservation and scientific institutions having the most advanced technology applied to water management and hydropower generation. Furthermore, a permanent "consultant panel" integrated by target groups representatives from different European countries are involved in key decisions and meetings, that guaranty a concrete regional scale participation. The present work reports the overall strategy of the project and the description of the main informatic tools that are under development and implementation in five pilot regions, located in Italy, Austria, Romania, Slovenia and Greece. Keywords: WFD Directive, RES-e Directive, water multi-purpose uses, renewable energy, small hydropower production, environmental balance, minimum environmental flow, flood protection
5. Main Control Switchboard (north end rear), view to the ...
5. Main Control Switchboard (north end rear), view to the south, with item 14 (the Libby transmission line panel) visible in left foreground, through item 9 (the Hot Springs No. 2 transmission line panel) obliquely visible on left side of the photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT