Standard spacecraft economic analysis. Volume 2: Findings and conclusions
NASA Technical Reports Server (NTRS)
Harris, E. D.; Large, J. P.
1976-01-01
The comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle were studied in two phases. In the first phase, a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and an Air Force standard spacecraft design were considered. The second phase dealt with additional procurement options using an upgraded version of an existing NASA design. The results of both phases are discussed.
Standard spacecraft economic analysis. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Harris, E. D.; Large, J. P.
1976-01-01
A study of the comparative program costs associated with use of various standardized spacecraft for Air Force space test program missions to be flown on the space shuttle during the 1980-1990 time period is reviewed. The first phase of the study considered a variety of procurement mixes composed of existing or programmed NASA standard spacecraft designs and a Air Force standard spacecraft design. The results were briefed to a joint NASA/Air Force audience on July 11, 1976. The second phase considered additional procurement options using an upgraded version of an existing NASA design. The results of both phases are summarized.
NASA Technical Reports Server (NTRS)
Harris, E. D.
1980-01-01
The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.
Intelsat VII program and the future
NASA Astrophysics Data System (ADS)
Madon, P. J.; Sachdev, D. K.
The evolution of the Intelsat VII spacecraft is discussed. The role of competitive procurement process in this evolution is addressed, and the overall system-level features of the spacecraft are reviewed. The time frame for the five Intelsat VII missions is summarized, and follow-up projects to Intelsat VII are discussed.
Burp Charging Nickel Metal Hydride Cells
NASA Technical Reports Server (NTRS)
Darcy, Eric; Pollard, Richard
1997-01-01
The SKYNET 4 constellation consists of three spacecraft which were launched between December 1988 and August 1990. The spacecraft are three-axis stabilized geostationary earth-orbiting military communications satellites with a design life of seven years on station. With the mission objective achieved all the batteries continue to give excellent performance. This paper presents a review of the history of the six batteries from cell procurement to the end of their design life and beyond. Differences in operational strategies are discussed and the lifetime trends in performance are analyzed. The combination of procurement acceptance criteria and the on-station battery management strategy utilized are presented as the prime factors in achieving completely successful battery performance throughout the mission.
Small star trackers for modern space vehicles
NASA Astrophysics Data System (ADS)
Kouzmin, Vladimir; Jushkov, Vladimir; Zaikin, Vladimir
2017-11-01
Based on experience of many years creation of spacecrafts' star trackers with diversified detectors (from the first star trackers of 60's to tens versions of star trackers in the following years), using technological achievements in the field of optics and electronics the NPP "Geofizika-Cosmos" has provided celestial orientation for all the space vehicles created in Russia and now has developed a series of new star trackers with CCD matrix and special processors, which are able to meet needs in celestial orientation of the modern spacecrafts for the nearest 10-15 years. In the given article the main characteristics and description of some star trackers' versions are presented. The star trackers have various levels of technical characteristics and use both combined (Russian and foreign) procurement parts, and only national (Russian) procurement parts for the main units.
Spacecraft (Mobile Satellite) configuration design study
NASA Technical Reports Server (NTRS)
1985-01-01
The relative costs to procure and operate a two-satellite mobile satellite system designed to operate either in the UHF band of the L Band, and with several antenna diameter options in each frequency band was investigated. As configured, the size of the spacecraft is limited to the current RCA Series 4000 Geosynchronous Communications Spacecraft bus, which spans the range from 4000 to 5800 pounds in the transfer orbit. The Series 4000 bus forms the basis around which the Mobile Satellite transponder and associated antennas were appended. Although the resultant configuration has little outward resemblance to the present Series 4000 microwave communications spacecraft, the structure, attitude control, thermal, power, and command and control subsystems of the Series 4000 spacecraft are all adapted to support the Mobile Satellite mission.
NASA Technical Reports Server (NTRS)
1974-01-01
The proposed spacecraft consists of a bus module, containing all subsystems required for support of the sensors, and a payload module containing all of the sensor equipment. The two modules are bolted together to form the spacecraft, and electrical interfaces are accomplished via mated connectors at the interface plane. This approach permits independent parallel assembly and test operations on each module up until mating for final spacecraft integration and test operations. Proposed program schedules recognize the need to refine sensor/spacecraft interfaces prior to proceeding with procurement, reflect the lead times estimated by suppliers for delivery of equipment, reflect a comprehensive test program, and provide flexibility for unanticipated problems. The spacecraft systems are described in detail along with aerospace ground equipment, ground handling equipment, the launch vehicle, imaging radar incorporation, and systems tests.
Leveraging Commercial Communication Satellites to support the Space Situational
NASA Astrophysics Data System (ADS)
Deaver, T.
The majority of USSTRATCOM detect and track requirements in the geosynchronous regime could be met via strategic placement of medium grade optical sensors on select geosynchronous satellites at relatively low cost in less than 48 months. An architecture which includes hosting SSA sensors on eight to ten commercial communication satellites could provide for highly accurate, timely and relatively inexpensive detect and track capabilities. The major factors considered when hosting any sensor on a commercial communications satellite are size, weight (mass) and power or SWAP. Additional sensor specific items must also be considered to form a complete feasibility analysis. These include data rate, mounting constraints, thermal balance, timing accuracy, and attitude stability requirements. All of these factors directly impact the cost and flexibility of hosting such a sensor on a geosynchronous communication satellite. By choosing a relatively light weight, low power consumption sensor which requires a small amount of bandwidth to transmit its data, the cost of hosting the sensor is kept to a minimum. Once the type of sensor or sensors is identified, the next step is to identify idea geosynchronous locations for the "hosted" sensors. Once these locations are identified, then one would identify a potential host which needs to be replaced within the desired timeframe. Once the host is identified, then the satellite owner / operator should be approached about hosting a "neighborhood" watch sensor aboard their spacecraft. Commercial satellites are routinely replaced based on age, lack of available station keeping fuel or to allow a service provider to upgrade its capabilities. Each commercial communication satellite operator maintains a plan of replacing spacecraft. Between the two largest commercial SATCOM providers, INTELSAT and SES, six to eight spacecraft will be replaced each year (100 plus spacecraft with 15 year average lifetimes). The satellites are usually procured, designed, built, launched and operational within 36 months. In order for the US Government to adapt to this timeline, a sensor specification would need to be established as well as a sensor procurement pipeline. The sensors would then be provided to the satellite bus manufacturer for integration onto the bus. The spacecraft would then be launched and operated by the commercial SATCOM operator for the life of the spacecraft. Based on this approach, it is highly conceivable that a complete geosynchronous "neighborhood" watch program could be completed within 48 months of initiation.
Design and Verification of Critical Pressurised Windows for Manned Spaceflight
NASA Astrophysics Data System (ADS)
Lamoure, Richard; Busto, Lara; Novo, Francisco; Sinnema, Gerben; Leal, Mendes M.
2014-06-01
The Window Design for Manned Spaceflight (WDMS) project was tasked with establishing the state-of-art and explore possible improvements to the current structural integrity verification and fracture control methodologies for manned spacecraft windows.A critical review of the state-of-art in spacecraft window design, materials and verification practice was conducted. Shortcomings of the methodology in terms of analysis, inspection and testing were identified. Schemes for improving verification practices and reducing conservatism whilst maintaining the required safety levels were then proposed.An experimental materials characterisation programme was defined and carried out with the support of the 'Glass and Façade Technology Research Group', at the University of Cambridge. Results of the sample testing campaign were analysed, post-processed and subsequently applied to the design of a breadboard window demonstrator.Two Fused Silica glass window panes were procured and subjected to dedicated analyses, inspection and testing comprising both qualification and acceptance programmes specifically tailored to the objectives of the activity.Finally, main outcomes have been compiled into a Structural Verification Guide for Pressurised Windows in manned spacecraft, incorporating best practices and lessons learned throughout this project.
Amateur Radio Communications with a Deep Space Probe (Yes, It's Possible)
NASA Astrophysics Data System (ADS)
Cudnik, Brian; Rahman, Mahmudur; Saganti, Seth; Erickson, Gary M.; Saganti, Premkumar
2015-05-01
Prairie View A&M University through the collaboration with NASA-Johnson Space Center has partnered with the Kyushu Institute of Technology (KIT), Japan and developed a payload for the Shinen-2 spacecraft that was launched from Japan on December 3, 2014 as part of the Hayabusa2 mission. The main purpose of the Shinen-2 spacecraft is deep space communication experiment to test the feasibility of deep-space radio communications from the spacecraft to Earth without the need of the Deep Space Network (DSN) of NASA. This presents an opportunity to the wider community of amateur astronomers, ham radio operators, and other research personnel in that they will have the opportunity to work with deep space communication such as Shinen-2 spacecraft. It should be possible to detect a signal as an increased strength from Shinen-2 spacecraft at a rest frequency of 437.385 MHz, using commercially available equipment procured at low-cost, when the spacecraft approaches to within 3,000,000 km of the Earth during December 2015.
Sealed-cell nickel-cadmium battery applications manual
NASA Technical Reports Server (NTRS)
Scott, W. R.; Rusta, D. W.
1979-01-01
The design, procurement, testing, and application of aerospace quality, hermetically sealed nickel-cadmium cells and batteries are presented. Cell technology, cell and battery development, and spacecraft applications are emphasized. Long term performance is discussed in terms of the effect of initial design, process, and application variables. Design guidelines and practices are given.
SMEX-Lite Modular Solar Array Architecture
NASA Technical Reports Server (NTRS)
Lyons, John W.; Day, John (Technical Monitor)
2002-01-01
The NASA Small Explorer (SMEX) missions have typically had three years between mission definition and launch. This short schedule has posed significant challenges with respect to solar array design and procurement. Typically, the solar panel geometry is frozen prior to going out with a procurement. However, with the SMEX schedule, it has been virtually impossible to freeze the geometry in time to avoid scheduling problems with integrating the solar panels to the spacecraft. A modular solar array architecture was developed to alleviate this problem. This approach involves procuring sufficient modules for multiple missions and assembling the modules onto a solar array framework that is unique to each mission. The modular approach removes the solar array from the critical path of the SMEX integration and testing schedule. It also reduces the cost per unit area of the solar arrays and facilitates the inclusion of experiments involving new solar cell or panel technologies in the SMEX missions.
Guidelines for the Procurement of Aerospace Nickel Cadmium Cells
NASA Technical Reports Server (NTRS)
Thierfelder, Helmut
1997-01-01
NASA has been using a Modular Power System containing "standard" nickel cadmium (NiCd) batteries, composed of "standard" NiCd cells. For many years the only manufacturer of the NASA "standard" NiCd cells was General Electric Co. (subsequently Gates Aerospace and now SAFT). This standard cell was successfully used in numerous missions. However, uncontrolled technical changes, and changes in industrial restructuring require a new approach. General Electric (now SAFT Aerospace Batteries) had management changes, new manufacturers entered the market (Eagle-Picher Industries, ACME Electric Corporation, Aerospace Division, Sanyo Electric Co.) and battery technology advanced. New NASA procurements for aerospace NiCd cells will have specifications unique to the spacecraft and mission requirements. This document provides the user/customer guidelines for the new approach to procuring of and specifying performance requirements for highly reliable NiCd cells and batteries. It includes details of key parameters and their importance. The appendices contain a checklist, detailed calculations, and backup information.
NASA Astrophysics Data System (ADS)
Bearden, David A.; Duclos, Donald P.; Barrera, Mark J.; Mosher, Todd J.; Lao, Norman Y.
1997-12-01
Emerging technologies and micro-instrumentation are changing the way remote sensing spacecraft missions are developed and implemented. Government agencies responsible for procuring space systems are increasingly requesting analyses to estimate cost, performance and design impacts of advanced technology insertion for both state-of-the-art systems as well as systems to be built 5 to 10 years in the future. Numerous spacecraft technology development programs are being sponsored by Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) agencies with the goal of enhancing spacecraft performance, reducing mass, and reducing cost. However, it is often the case that technology studies, in the interest of maximizing subsystem-level performance and/or mass reduction, do not anticipate synergistic system-level effects. Furthermore, even though technical risks are often identified as one of the largest cost drivers for space systems, many cost/design processes and models ignore effects of cost risk in the interest of quick estimates. To address these issues, the Aerospace Corporation developed a concept analysis methodology and associated software tools. These tools, collectively referred to as the concept analysis and design evaluation toolkit (CADET), facilitate system architecture studies and space system conceptual designs focusing on design heritage, technology selection, and associated effects on cost, risk and performance at the system and subsystem level. CADET allows: (1) quick response to technical design and cost questions; (2) assessment of the cost and performance impacts of existing and new designs/technologies; and (3) estimation of cost uncertainties and risks. These capabilities aid mission designers in determining the configuration of remote sensing missions that meet essential requirements in a cost- effective manner. This paper discuses the development of CADET modules and their application to several remote sensing satellite mission concepts.
NASA Launch Services Program Overview
NASA Technical Reports Server (NTRS)
Higginbotham, Scott
2016-01-01
The National Aeronautics and Space Administration (NASA) has need to procure a variety of launch vehicles and services for its unmanned spacecraft. The Launch Services Program (LSP) provides the Agency with a single focus for the acquisition and management of Expendable Launch Vehicle (ELV) launch services. This presentation will provide an overview of the LSP and its organization, approach, and activities.
Holographic Weapons Sight as Crew Optical Alignment Sight
NASA Technical Reports Server (NTRS)
Merancy, Nujoud; Dehmlow, Brian; Brazzel, Jack P.
2011-01-01
Crew Optical Alignment Sights (COAS) are used by spacecraft pilots to provide a visual reference to a target spacecraft for lateral relative position during rendezvous and docking operations. NASA s Orion vehicle, which is currently under development, has not included a COAS in favor of automated sensors, but the crew office has requested such a device be added for situational awareness and contingency support. The current Space Shuttle COAS was adopted from Apollo heritage, weighs several pounds, and is no longer available for procurement which would make re-use difficult. In response, a study was conducted to examine the possibility of converting a commercially available weapons sight to a COAS for the Orion spacecraft. The device used in this study was the XPS series Holographic Weapon Sight (HWS) procured from L-3 EOTech. This device was selected because the targeting reticule can subtend several degrees, and display a graphic pattern tailored to rendezvous and docking operations. Evaluations of the COAS were performed in both the Orion low-fidelity mockup and rendezvous simulations in the Reconfigurable Operational Cockpit (ROC) by crewmembers, rendezvous engineering experts, and flight controllers at Johnson Space Center. These evaluations determined that this unit s size and mounting options can support proper operation and that the reticule visual qualities are as good as or better than the current Space Shuttle COAS. The results positively indicate that the device could be used as a functional COAS and supports a low-cost technology conversion solution.
The first and second generation Aussat systems
NASA Astrophysics Data System (ADS)
Hope, W.
1988-12-01
The present three-spacecraft Aussat satellite communication system is described and illustrated with extensive drawings, diagrams, and photographs; and plans for the second-generation system (Aussat-B, to begin replacing the current spacecraft in 1992) are discussed. Consideration is given to the legal status, structure, and staff of the Aussat organization; the first-generation space segment; satellite launch and orbital transfer procedures; the Aussat communication payload; the ground segment; and the current market for satellite services in Australia. For the second-generation system, topics addressed include additional and improved services, the Aussat-B procurement program, mobile satellite services, and the impact on the Australian space industry.
A Tailored Concept of Operations for NASA LSP Integrated Operations
NASA Technical Reports Server (NTRS)
Owens, Clark V.
2016-01-01
An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this project is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services.
A programmable heater control circuit for spacecraft
NASA Technical Reports Server (NTRS)
Nguyen, D. D.; Owen, J. W.; Smith, D. A.; Lewter, W. J.
1994-01-01
Spacecraft thermal control is accomplished for many components through use of multilayer insulation systems, electrical heaters, and radiator systems. The heaters are commanded to maintain component temperatures within design specifications. The programmable heater control circuit (PHCC) was designed to obtain an effective and efficient means of spacecraft thermal control. The hybrid circuit provides use of control instrumentation as temperature data, available to the spacecraft central data system, reprogramming capability of the local microprocessor during the spacecraft's mission, and the elimination of significant spacecraft wiring. The hybrid integrated circuit has a temperature sensing and conditioning circuit, a microprocessor, and a heater power and control circuit. The device is miniature and housed in a volume which allows physical integration with the component to be controlled. Applications might include alternate battery-powered logic-circuit configurations. A prototype unit with appropriate physical and functional interfaces was procured for testing. The physical functionality and the feasibility of fabrication of the hybrid integrated circuit were successfully verified. The remaining work to develop a flight-qualified device includes fabrication and testing of a Mil-certified part. An option for completing the PHCC flight qualification testing is to enter into a joint venture with industry.
Jumbo Space Environment Simulation and Spacecraft Charging Chamber Characterization
2015-04-09
PAGE Using Government drawings, specifications, or other data included in this document for any purpose other than Government procurement does not...in any way obligate the U.S. Government. The fact that the Government formulated or supplied the drawings, specifications, or other data does not...including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing
1986-02-10
determination of space stations’ coordinates. We are also con- ducting scientific studies of celestial mechanics here." The Maksutov-Sobolev camera ...ionosphere, through which the signals propagated. The trajectories of the spacecraft "Vega-1" and "Vega-2" themselves were determined with high...source. The contents of this publication in no way represent the poli- cies, views or attitudes of the U.S. Government. PROCUREMENT OF
Performance of Nickel-Cadmium Batteries on the POES Series of Weather Satellites
NASA Technical Reports Server (NTRS)
Rao, Gopalakrishna M.; Chetty, P. R. K.; Boyce, Ron; Smalls, Vanessa; Spitzer, Tom
1998-01-01
The advanced Television Infrared Observation satellite program is a cooperative effort between the National Aeronautics and Space Administration (NASA), the National Oceanic and Atmospheric Administration (NOAA), the United Kingdom, Canada and France, for providing day and night global environmental and associated data. NASA is responsible for procurement launch, and checkout of these spacecraft before transferring them over to NOAA, who operates the spacecraft to support weather forecasting, severe storm tracking, and 'meteorological research by the National Weather Service. These spacecraft with all weather monitoring instruments imposed challenging requirements for the onboard electrical power subsystem (EPS). This paper provides first a brief overview of the overall power subsystem, followed by a description of batteries. A unique power subsystem design which provides 'tender-loving-care' to these batteries is highlighted. This is followed by the on-orbit maintenance and performance data of the batteries since launch.
DOT National Transportation Integrated Search
2007-09-01
Traditional state procurement processes are not well-suited to the procurement of Intelligent Transportation Systems (ITS). The objective of this study was to analyze Kentuckys existing procurement processes, identify strengths and weaknesses of e...
29 CFR 95.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Cost and price analysis. 95.45 Section 95.45 Labor Office of... Procurement Standards § 95.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...
49 CFR 19.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Cost and price analysis. 19.45 Section 19.45... Requirements Procurement Standards § 19.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price...
Crew-Aided Autonomous Navigation Project
NASA Technical Reports Server (NTRS)
Holt, Greg
2015-01-01
Manual capability to perform star/planet-limb sightings provides a cheap, simple, and robust backup navigation source for exploration missions independent from the ground. Sextant sightings from spacecraft were first exercised in Gemini and flew as the loss-of-communications backup for all Apollo missions. This study seeks to procure and characterize error sources of navigation-grade sextants for feasibility of taking star and planetary limb sightings from inside a spacecraft. A series of similar studies was performed in the early/mid-1960s in preparation for Apollo missions, and one goal of this study is to modernize and update those findings. This technique has the potential to deliver significant risk mitigation, validation, and backup to more complex low-TRL automated systems under development involving cameras.
NASA Astrophysics Data System (ADS)
Candra, S.; E Gunawan, F.
2017-01-01
In digital economy, government of Indonesia uses the internet to deliver services and to communicate with citizens and organizations. One of applications are e-Procurement and LPSE is a unit to hold the service system of e-Procurement. Procurement of goods and services electronically in addition will increase transparency and accountability, improve market access and healthy competition, as well as improving the efficiency of the procurement process. Based on the background and specific objectives to be achieved, then the research will be viewed from e-Marketplace participation, Trust and its impact on the performance of existing procurement within the institution. Methods of data analysis used in this research is by using analysis of Structural Equation Modelling (SEM) by using the program Partial Least Square (PLS) to examine the relationship between variables. The population used in this study is an enterprise as well as other clients using the system LPSE Bekasi District. There are three part in this study population, namely the provision of a company, customer, and supplier of LPSE users amounted to 60 users. From data analysis, there are one hypothesis that rejected. The implication of this study are implementation of e-procurement and e-marketplace participation giving impact to procurement performance.
Managing the Implementation of Mission Operations Automation
NASA Technical Reports Server (NTRS)
Sodano, R.; Crouse, P.; Odendahl, S.; Fatig, M.; McMahon, K.; Lakin, J.
2006-01-01
Reducing the cost of mission operations has necessitated a high level of automation both on spacecraft and ground systems. While automation on spacecraft is implemented during the design phase, ground system automation tends to be implemented during the prime mission operations phase. Experience has shown that this tendency for late automation development can be hindered by several factors: additional hardware and software resources may need to be procured; software must be developed and tested on a non-interference basis with primary operations with limited manpower; and established procedures may not be suited for automation requiring substantial rework. In this paper we will review the experience of successfully automating mission operations for seven on-orbit missions: the Compton Gamma Ray Observatory (CGRO), the Rossi X-Ray Timing Explorer (RXTE), the Advanced Composition Explorer (ACE), the Far Ultraviolet Spectroscopic Explorer (FUSE), Interplanetary Physics Laboratory (WIND), Polar Plasma Laboratory (POLAR), and the Imager for Magnetopause-to-Aurora Global Exploration (IMAGE). We will provide lessons learned in areas such as: spacecraft recorder management, procedure development, lights out commanding from the ground system vs. stored command loads, spacecraft contingency response time, and ground station interfaces. Implementing automation strategies during the mission concept and spacecraft integration and test phase as the most efficient method will be discussed.
NASA Astrophysics Data System (ADS)
Alard, Robert; Gustafsson, Martin; Nienhaus, Jörg
The management of buyer-supplier relations is a major topic for many enterprises today. Modern Information and Communication Technologies (ICT) offer interesting perspectives on opportunities and implementation approaches. Today, logistics and procurement departments of numerous enterprises are evaluating the possibilities and opportunities of new ICT solutions and especially of internet-based electronic procurement solutions for the optimisation and re-engineering of their buyer-supplier relationships. Due to the highly innovative character of the new ICT solutions and the scarcely available operational examples in the industry, only little guidance exists to support responsible managers during the evaluation, planning and designing of internet-based electronic procurement solutions. This paper describes a framework for the strategic evaluation and planning of the deployment of internet-based procurement solutions for direct materials. The presented approach supports enterprises in the analysis of procurement objects and procurement structuring, in the definition and management of buyer-supplier-relationships, in the requirements analysis of ICT solutions as well as the assessment of the potential to support procurement with innovative ICT and internet-based electronic procurement solutions.
Draft Environmental Impact Statement for the Ulysses Mission (Tier 2)
NASA Technical Reports Server (NTRS)
1990-01-01
This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Ulysses spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special(PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG). The potential effects considered in this EIS include risks of air and water quality impacts, local land area contamination, adverse health and safety impacts, the disturbance of biotic resources, impacts on wetland areas or areas containing historical sites, and socioeconomic impacts. Intensive analysis of the possible accidents associated with the proposed action are underway and preliminary results indicate small health or environmental risks. The results of a Final Safety Analysis Report will be available for inclusion into the final EIS.
Tailoring a ConOps for NASA LSP Integrated Operations
NASA Technical Reports Server (NTRS)
Owens, Skip Clark V., III
2017-01-01
An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this paper is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services. This tailoring effort was performed as the authors final Masters Project in the Spring of 2016 for the Stevens Institute of Technology and modified for publication with INCOSE (Owens, 2016).
Swift Gamma-Ray Burst Explorer: Mission Design for Rapid, Accurate Location of Gamma-ray Bursts
NASA Technical Reports Server (NTRS)
Bundas, David J.
2004-01-01
The Swift Gamma-ray Burst Explorer is a NASA Mid-sized Explorer (MIDEX) with the primary mission of determining the origins of Gamma-Ray Bursts (GRBs). It will be the first mission to autonomously respond to newly-discovered GRBs and provide immediate follow-up narrow field instruments capable of multi-wavelength (UV, Optical, X-ray) observations. The characteristics of GRBs that are the key mission design drivers, are their non-repeating and brief duration bursts of multi-wavelength photons. In addition, rapid notification of the location and characteristics of the GRBs to ground-and-space- based observatories drive the end-to-end data analysis and distribution requirements. The Swift mission is managed by the GSFC, and includes an international team of contributors that each bring their unique perspective that have proven invaluable to the mission. The spacecraft bus, provided by Spectrum Astro, Inc. was procured through a Rapid Spacecraft Development Office (RSDO) contract by the GSFC. There are three instruments: the Burst Alert Telescope (BAT) provided by the GSFC; the X-Ray Telescope (XRT) provided by a team led by the Pennsylvania State University (PSU); and the Ultra-Violet Optical Telescope (UVOT), again managed by PSU. The Mission Operations Center (MOC) was developed by and is located at PSU. Science archiving and data analysis centers are located at the GSFC, in the UK and in Italy.
Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik
2013-01-01
Objective To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Design Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. Results The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. Conclusions The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers. PMID:23388196
Singh, Prabal Vikram; Tatambhotla, Anand; Kalvakuntla, Rohini; Chokshi, Maulik
2013-01-01
To perform an initial qualitative comparison of the different procurement models in India to frame questions for future research in this area; to capture the finer differences between the state models through 53 process and price parameters to determine their functional efficiencies. Qualitative analysis is performed for the study. Five states: Tamil Nadu, Kerala, Odisha, Punjab and Maharashtra were chosen to ensure heterogeneity in a number of factors such as procurement type (centralised, decentralised or mixed); autonomy of the procurement organisation; state of public health infrastructure; geography and availability of data through Right to Information Act (RTI). Data on procurement processes were collected through key informant analysis by way of semistructured interviews with leadership teams of procuring organisations. These process data were validated through interviews with field staff (stakeholders of district hospitals, taluk hospitals, community health centres and primary health centres) in each state. A total of 30 actors were interviewed in all five states. The data collected are analysed against 52 process and price parameters to determine the functional efficiency of the model. The analysis indicated that autonomous procurement organisations were more efficient in relation to payments to suppliers, had relatively lower drug procurement prices and managed their inventory more scientifically. The authors highlight critical success factors that significantly influence the outcome of any procurement model. In a way, this study raises more questions and seeks the need for further research in this arena to aid policy makers.
Mission Success and Environmental Protection: Orbital Debris Considerations
NASA Technical Reports Server (NTRS)
Johnson, Nicholas
2007-01-01
The current U.S. National Space Policy specifically calls on U.S. Government entities "to follow the United States Government Orbital Debris Mitigation Standard Practices, consistent with mission requirements and cost effectiveness, in the procurement and operation of spacecraft, launch services, and the operation of tests and experiments in space. Early assessment (pre-PDR) of orbital debris mitigation compliance is essential to minimize development impacts. Orbital debris mitigation practices today are the most effective means to protect the near-Earth space environment for future missions.
Mars Geoscience Climatology Orbiter (MGCO) extended study: Technical volume
NASA Technical Reports Server (NTRS)
1983-01-01
The FLTSATCOM Earth orbiting communications satellite is a prominent candidate to serve as the Mars Geoscience Climatology Orbiter (MGCO) spacecraft. Major aspects directly applicable are: (1) the incorporation of solid orbit insertion motor; (2) the ability to cruise to Mars in the spin-stabilized mode; (3) ample capability for payload mass and power; (4) attitude control tried to nadir and orbit plane coordinates; (5) exemplary Earth orbital performance record and projected lifetime; and (6) existence of an on-going procurement into the MGCO time period.
NASA Technical Reports Server (NTRS)
1996-01-01
This booklet of pocket statistics includes the 1996 NASA Major Launch Record, NASA Procurement, Financial, and Workforce data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Luanch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.
Transformation of fraud activities in procurement system in Indonesia
NASA Astrophysics Data System (ADS)
Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.
2017-03-01
E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.
Geostationary Operational Environmental Statellite(GEOS-N report)
NASA Technical Reports Server (NTRS)
1991-01-01
The Advanced Missions Analysis Office (AMAO) of GSFC has completed a study of the Geostationary Operational Environmental Satellites (GOES-N) series. The feasibility, risks, schedules, and associated costs of advanced space and ground system concepts responsive to National Oceanic and Atmospheric Administration (NOAA) requirements were evaluated. The study is the first step in a multi-phased procurement effort that is expected to result in launch ready hardware in the post 2000 time frame. This represents the latest activity of GSFC in translating meteorological requirements of NOAA into viable space systems in geosynchronous earth orbits (GEO). GOES-N represents application of the latest spacecraft, sensor, and instrument technologies to enhance NOAA meteorological capabilities via remote and in-situ sensing from GEO. The GOES-N series, if successfully developed, could become another significant step in NOAA weather forecasting space systems, meeting increasingly complex emerging national needs for that agency's services.
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1260.145 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
38 CFR 49.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Cost and price analysis... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
40 CFR 30.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Cost and price analysis. 30.45 Section... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
Design and engineering analysis of material procurement mobile operation platform
NASA Astrophysics Data System (ADS)
Ding, H.; Li, J.
2014-03-01
The material procurement mobile operation platform (MPMOP) consists of six modules, including network operation, truck transportation, remote communication, satellite positioning, power supply and environment regulation. The MPMOP is designed to have six major functions, including online procurement, command control, remote communication, satellite positioning, information management and auxiliary decision. The paper implements an engineering analysis on the MPMOP from three aspects, including transportation transfinite, centroid, and power dissipation.
Gonçalves, Michele Martins; Leles, Cláudio Rodrigues; Freire, Maria do Carmo Matias
2013-01-01
The objective of this ecological study was to investigate the association between caries experience in 5- and 12-year-old Brazilian children in 2010 and household sugar procurement in 2003 and the effects of exposure to water fluoridation and socioeconomic indicators. Sample units were all 27 Brazilian capital cities. Data were obtained from the National Surveys of Oral Health; the National Household Food Budget Survey; and the United Nations Program for Development. Data analysis included correlation coefficients, exploratory factor analysis, and linear regression. There were significant negative associations between caries experience and procurement of confectionery, fluoridated water, HDI, and per capita income. Procurement of confectionery and soft drinks was positively associated with HDI and per capita income. Exploratory factor analysis grouped the independent variables by reducing highly correlated variables into two uncorrelated component variables that explained 86.1% of total variance. The first component included income, HDI, water fluoridation, and procurement of confectionery, while the second included free sugar and procurement of soft drinks. Multiple regression analysis showed that caries is associated with the first component. Caries experience was associated with better socioeconomic indicators of a city and exposure to fluoridated water, which may affect the impact of sugars on the disease. PMID:24307900
An Analysis of Bid Evaluation Procedures of Contemporary Models for Procurement in Pakistan
2016-12-01
21 E. COMPONENTS FOR BID EVALUATION .........................................21 1. Market Intelligence...PROCUREMENT SYSTEM ...............................................23 1. Basic Principles ...43 1. Principles of Procurement and Prequalification .......................43 2. Contract Types
14 CFR 1274.506 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Cost and price analysis. 1274.506 Section... WITH COMMERCIAL FIRMS Procurement Standards § 1274.506 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Cost and price analysis. 84.45....45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Cost and price analysis... § 105-72.505 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...
32 CFR 32.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 1 2010-07-01 2010-07-01 false Cost and price analysis. 32.45 Section 32.45... price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be accomplished in various ways...
43 CFR 12.945 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Cost and price analysis. 12.945 Section 12... Requirements § 12.945 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every procurement action. Price analysis may be...
An analysis of disruptions in aerospace/defense organizations that affect the supply chain
NASA Astrophysics Data System (ADS)
Dickerson, Toscha L.
The purpose of this quantitative study was to determine whether or not functions of procurement organizations structures' and aerospace suppliers were perceived as disruptions and to identify their effects on lead time and costs within a supply chain. An analysis of employees' perception of centralized and decentralized procurement functions, aerospace and defense suppliers, lead times of goods and services, price increases, and schedule delays was conducted. Prior studies are limited in regards to understanding how specific procurement functions affects an organization procurement structure. This non-experimental quantitative study allowed for a survey to be administered to aerospace and defense companies throughout the United States to obtain information from sourcing and procurement professionals with 5 or more years of experience. The current study utilized a 10 question survey based on the 5- point Likert -type scale to determine the findings. Through descriptive and inferential statistics, using regression analysis, standard deviation, and P-value; findings indicated that the majority of the participants surveyed perceived both centralized and decentralized procurement functions affected lead time and cost of goods and services resulted in a positive effect and were considered as supply chain disruptions.
Interleaved array antenna technology development
NASA Technical Reports Server (NTRS)
1985-01-01
This is the third phase of a program to establish an antenna concept for shuttle and free flying spacecraft earth resources experiments using Synthetic Aperture Radar. The feasibility of a plated graphite epoxy waveguide for a space antenna was evaluated. A quantity of flat panels and waveguides were developed, procured, and tested for electrical and mechanical properties. In addition, processes for the assembly of a unique waveguide array were investigated. Finally, trades between various configurations that would allow elevation (range) electronic scanning and that would minimize feed complexity for various RF bandwidths were made.
Domestic mobile satellite systems in North America
NASA Technical Reports Server (NTRS)
Wachira, Muya
1990-01-01
Telest Mobile Inc. (TMI) and the American Mobile Satellite Corporation (AMSC) are authorized to provide mobile satellite services (MSS) in Canada and the United States respectively. They are developing compatible systems and are undertaking joint specification and procurement of spacecraft and ground segment with the aim of operational systems by late 1993. Early entry (phase 1) mobile data services are offered in 1990 using space segment capacity leased from Inmarsat. Here, an overview is given of these domestic MSS with an emphasis on the TMI component of the MSAT systen.
Lannau, B; Van Geyt, C; Van Maele, G; Beele, H
2015-03-01
During the procurement of musculoskeletal grafts contamination may occur. As this might be detrimental for the acceptor, it is important to know which variables influence this occurrence and to alter procurement protocols accordingly. From 2004 to 2012 we gathered information on 6,428 allografts obtained from 291 donors. Using a multiple regression model we attempted to determine the factors that influence the contamination risk during procurement. We used the following variables: cause of death, type of hospital (i.e. university hospital vs. general hospital), previous blood vessel donation, previous organ donation, donor age, time between death and the start of the procurement, duration of the procurement, number of people attending the procurement and the number of procured grafts. The multiple regression model was only able to explain 5 % of the variability of the used outcome variable. None of the variables examined appear to have an important influence on the contamination risk.
28 CFR 70.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost and price analysis. 70.45 Section 70... NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 70.45 Cost and price analysis. Some form of cost or price analysis must be made and documented in the procurement files in connection...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Cost and price analysis. 14.45 Section... COMMERCIAL ORGANIZATIONS Post-Award Requirements Procurement Standards § 14.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with...
22 CFR 226.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Cost and price analysis. 226.45 Section 226.45...-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with...
Optimizing national immunization program supply chain management in Thailand: an economic analysis.
Riewpaiboon, A; Sooksriwong, C; Chaiyakunapruk, N; Tharmaphornpilas, P; Techathawat, S; Rookkapan, K; Rasdjarmrearnsook, A; Suraratdecha, C
2015-07-01
This study aimed to conduct an economic analysis of the transition of the conventional vaccine supply and logistics systems to the vendor managed inventory (VMI) system in Thailand. Cost analysis of health care program. An ingredients based approach was used to design the survey and collect data for an economic analysis of the immunization supply and logistics systems covering procurement, storage and distribution of vaccines from the central level to the lowest level of vaccine administration facility. Costs were presented in 2010 US dollar. The total cost of the vaccination program including cost of vaccine procured and logistics under the conventional system was US$0.60 per packed volume procured (cm(3)) and US$1.35 per dose procured compared to US$0.66 per packed volume procured (cm(3)) and US$1.43 per dose procured under the VMI system. However, the findings revealed that the transition to the VMI system and outsourcing of the supply chain system reduced the cost of immunization program at US$6.6 million per year because of reduction of un-opened vaccine wastage. The findings demonstrated that the new supply chain system would result in efficiency improvement and potential savings to the immunization program compared to the conventional system. Copyright © 2015 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
Prevalence and correlates of hospital-based autologous blood programs: a statewide survey.
Hull, A L; Neuhauser, D V; Goodnough, L T
1992-05-01
To identify potential barriers to use of autologous blood procurement to minimize homologous blood transfusion needs during elective surgery, the authors conducted a telephone survey of 120 blood bank directors, representing 138 Ohio hospitals. The prevalence of autologous blood procurement facilities, estimated volume of autologous blood, and attitudes and perceptions of the directors toward autologous blood predeposit programs were assessed. Analysis of the data indicated that 30% of Ohio hospitals have autologous blood procurement facilities; larger hospitals were more likely to have this facility. Overall, 5.5% of transfusions involve predeposited autologous blood. No significant differences were found according to hospital bed size or whether the hospital had a procurement facility. Blood bank directors perceived surgeons to be knowledgeable about autologous predeposit; patient demand and surgical practice were felt to be more effective in promoting the use of autologous blood at the hospital than were blood bank efforts. Directors who had autologous predeposit procurement facilities perceived that the facility provided a marketing advantage. Respondents from larger hospitals were more likely to perceive that these programs could be financially self-sufficient. The authors conclude that an economic cost-benefit analysis of hospital-based autologous blood procurement programs is important. Positive findings may influence transfusion services to adopt autologous blood procurement programs, whereas negative findings may convince hospitals that community blood donor facilities can provide better autologous blood procurement.
77 FR 8028 - Semiannual Regulatory Agenda
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-13
... provides summary descriptions of regulations being developed by the Civilian Agency Acquisition Council and... Analysis Required: Yes. Agency Contact: Karlos Morgan, Procurement Analyst, DOD/GSA/NASA (FAR), 1275 First... 05/00/12 Regulatory Flexibility Analysis Required: Yes. Agency Contact: William Clark, Procurement...
Systems Analysis Directorate Activities Summary August 1977
1977-09-01
are: x a. Cataloging direction b. Requirements computation c. Procurement direction d. Distribution management e. Disposal direction f...34inventory management," as a responsibility of NICP’s, includes cataloging, requirements computation, procurement direction, distribution management , maintenance...functions are cataloging, major item management, secondary item management, procurement direction, distribution management , overhaul and rebuild
reduction opportunities Domestic electricity markets Corporate renewable procurement Research Interests State and Local Clean Energy Policy Impact Analysis Corporate Renewable Energy Procurement Strategies
Report from the School of Experience: Lessons-Learned on NASA's EOS/ICESat Mission
NASA Technical Reports Server (NTRS)
Anselm, William
2003-01-01
Abstract-NASA s Earth Observing System EOS) Ice, Cloud, and Land Elevation Satellite (ICESat) mission was one of the first missions under Goddard Space Flight Center s (then-) new Rapid Spacecraft Development Office. This paper explores the lessons-learned under the ICESat successful implementation and launch, focusing on four areas: Procurement., Management, Technical, and Launch and Early Operations. Each of these areas is explored in a practical perspective of communication, the viewpoint of the players, and the interactions among the organizations. Conclusions and lessons-learned are summarized in the final section.
Micro optical sensor systems for sunsensing applications
NASA Astrophysics Data System (ADS)
Leijtens, Johan; de Boom, Kees
2017-11-01
Optimum application of micro system technologies allows building small sensor systems that will alter procurement strategies for spacecraft manufacturers. One example is the decreased size and cost for state of the art sunsensors. Integrated sensor systems are being designed which, through use of microsystem technology, are an order of magnitutde smaller than most current sunsensors and which hold due to the large reproducibility through batch manufacturing the promise of drastic price reduction. If the Commercial Of The Shelf (COTS) approach is adopted by satellite manufacturers, this will drastically decrease mass and cost budgets associated with sunsensing applications.
NASA Technical Reports Server (NTRS)
1995-01-01
NASA Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.
NASA Technical Reports Server (NTRS)
1994-01-01
Pocket Statistics is published for the use of NASA managers and their staff. Included herein is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, and NASA Procurement, Financial, and Manpower data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.
Bearing Procurement Analysis Method by Total Cost of Ownership Analysis and Reliability Prediction
NASA Astrophysics Data System (ADS)
Trusaji, Wildan; Akbar, Muhammad; Sukoyo; Irianto, Dradjad
2018-03-01
In making bearing procurement analysis, price and its reliability must be considered as decision criteria, since price determines the direct cost as acquisition cost and reliability of bearing determine the indirect cost such as maintenance cost. Despite the indirect cost is hard to identify and measured, it has high contribution to overall cost that will be incurred. So, the indirect cost of reliability must be considered when making bearing procurement analysis. This paper tries to explain bearing evaluation method with the total cost of ownership analysis to consider price and maintenance cost as decision criteria. Furthermore, since there is a lack of failure data when bearing evaluation phase is conducted, reliability prediction method is used to predict bearing reliability from its dynamic load rating parameter. With this method, bearing with a higher price but has higher reliability is preferable for long-term planning. But for short-term planning the cheaper one but has lower reliability is preferable. This contextuality can give rise to conflict between stakeholders. Thus, the planning horizon needs to be agreed by all stakeholder before making a procurement decision.
Thrailkill, Eric A.; Bouton, Mark E.
2015-01-01
Instrumental behavior often consists of sequences or chains of responses that minimally include procurement behaviors that enable subsequent consumption behaviors. In such chains, behavioral units are linked by access to one another and eventually to a primary reinforcer, such as food or a drug. The present experiments examined the effects of extinguishing procurement responding on consumption responding after training of a discriminated heterogeneous instrumental chain. Rats learned to make a procurement response (e.g., pressing a lever) in the presence of a distinctive discriminative stimulus; making that response led to the presentation of a second discriminative stimulus that set the occasion for a consumption response (e.g., pulling a chain), which then produced a food-pellet reinforcer. Experiment 1 showed that extinction of either the full procurement-consumption chain or procurement alone weakened the consumption response tested in isolation. Experiment 2 replicated the procurement extinction effect and further demonstrated that the opportunity to make the procurement response, as opposed to simple exposure to the procurement stimulus alone, was required. In Experiment 3, rats learned 2 distinct discriminated heterogeneous chains; extinction of 1 procurement response specifically weakened the consumption response that had been associated with it. The results suggest that learning to inhibit the procurement response may produce extinction of consumption responding through mediated extinction. The experiments suggest the importance of an associative analysis of instrumental behavior chains. PMID:25915751
SMEX-Lite Modular Solar Array Architecture
NASA Technical Reports Server (NTRS)
Lyons, John
2002-01-01
For the most part, Goddard solar arrays have been custom designs that are unique to each mission. The solar panel design has been frozen prior to issuing an RFP for their procurement. There has typically been 6-9 months between RFP release and contract award, followed by an additional 24 months for performance of the contract. For Small Explorer (SMEX) missions, with three years between mission definition and launch, this has been a significant problem. The SMEX solar panels have been sufficiently small that the contract performance period has been reduced to 12-15 months. The bulk of this time is used up in the final design definition and fabrication of flight solar cell assemblies. Even so, it has been virtually impossible to have the spacecraft design at a level of maturity sufficient to freeze the solar panel geometry and release the RFP in time to avoid schedule problems with integrating the solar panels to the spacecraft. With that in mind, the SMEX-Lite project team developed a modular architecture for the assembly of solar arrays to greatly reduce the cost and schedule associated with the development of a mission- specific solar array. In the modular architecture, solar cells are fabricated onto small substrate panels. This modular panel (approximately 8.5" x 17" in this case) becomes the building block for constructing solar arrays for multiple missions with varying power requirements and geometrical arrangements. The mechanical framework that holds these modules together as a solar array is the only mission-unique design, changing in size and shape as required for each mission. There are several advantages to this approach. First, the typical solar array development cycle requires a mission unique design, procurement, and qualification including a custom qualification panel. With the modular architecture, a single qualification of the SMEX-Lite modules and the associated mechanical framework in a typical configuration provided a qualification by similarity to multiple missions. It then becomes possible to procure solar array modules in advance of mission definition and respond quickly and inexpensively to a selected mission's unique requirements. The solar array modular architecture allows the procurement of solar array modules before the array geometry has been frozen. This reduces the effect of procurement lead-time on the mission integration and test flow by as much as 50%. Second, by spreading the non-recurring costs over multiple missions, the cost per unit area is also reduced. In the case of the SMEX-Lite procurement, this reduction was by about one third of the cost per unit area compared to previous SMEX mission-unique procurements. Third, the modular architecture greatly facilitates the infusion of new solar cell technologies into flight programs as these technologies become available. New solar cell technologies need only be fabricated onto a standard-sized module to be incorporated into the next available mission. The modular solar array can be flown in a mixed configuration with some new and some standard cell technologies. Since each module has its own wiring terminals, the array can be arranged as desired electrically with little impact to cost and schedule. The solar array modular architecture does impose some additional constraints on systems and subsystem engineers. First, they must work with discrete solar array modules rather than size the array to fit exactly within an available envelope. The array area is constrained to an integer multiple of the module area. Second, the modular design is optimized for space radiation and thermal environments not greatly different from a typical SMEX LEO environment. For example, a mission with a highly elliptical orbit (e.g., Polar, SMEX/FAST) would require thicker coverglasses to protect the solar cells from the more intense radiation environment.
[The SWOT analysis and strategic considerations for the present medical devices' procurement].
Li, Bin; He, Meng-qiao; Cao, Jian-wen
2006-05-01
In this paper, the SWOT analysis method is used to find out the internal strength, weakness, exterior opportunities and threats of the present medical devices' procurements in hospitals and some strategic considerations are suggested as "one direction, two expansions, three changes and four countermeasures".
Defense Procurement: An Analysis of Contract Management Internal Controls
2015-03-22
monitoring activities component of the internal control framework. Acquisition Research Program Graduate School of Business & Public Policy - 7...Research Program Graduate School of Business & Public Policy - 24 - Naval Postgraduate School Tan, L. H. J. (2013). An analysis of internal controls and...Naval Postgraduate School, Monterey, CA 93943. Defense Procurement: An Analysis of Contract Management Internal Controls 22 March 2015 Dr. Juanita
NASA Astrophysics Data System (ADS)
Ninomiya, Hitoshi; Nanerikawa, Susumu
Public procurement system such as Overall-Evaluation dynamically has been changed on local public works in Japan. However some characteristics of Bidding-Strategy and procurement system have not enough clarified. This paper attempt to analysis for a syatem dynamics and mechanisum of Overall-Evaluation by developing new simulation model focused on Bidding-Strategy, to propose some improvement scenario.
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2012 CFR
2012-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2011 CFR
2011-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2014 CFR
2014-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2010 CFR
2010-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
22 CFR 124.13 - Procurement by United States persons in foreign countries (offshore procurement).
Code of Federal Regulations, 2013 CFR
2013-04-01
... (build-to-print means producing an end-item (i.e., system, subsystem or component) from technical... of any information which discloses design methodology, engineering analysis, detailed process...
NASA Technical Reports Server (NTRS)
Schlagheck, R. A.
1977-01-01
New planning techniques and supporting computer tools are needed for the optimization of resources and costs for space transportation and payload systems. Heavy emphasis on cost effective utilization of resources has caused NASA program planners to look at the impact of various independent variables that affect procurement buying. A description is presented of a category of resource planning which deals with Spacelab inventory procurement analysis. Spacelab is a joint payload project between NASA and the European Space Agency and will be flown aboard the Space Shuttle starting in 1980. In order to respond rapidly to the various procurement planning exercises, a system was built that could perform resource analysis in a quick and efficient manner. This system is known as the Interactive Resource Utilization Program (IRUP). Attention is given to aspects of problem definition, an IRUP system description, questions of data base entry, the approach used for project scheduling, and problems of resource allocation.
Vehicle Procurement Lessons Learned at Yosemite National Park.
DOT National Transportation Integrated Search
2005-02-28
In seeking to obtain replacement buses for its Valley Shuttle fleet, Yosemite National Park encountered numerous uncertainties in the procurement process that complicated what was intended to be a relatively straightforward purchase. The analysis tha...
Draft environmental impact statement for the Galileo Mission (Tier 2)
NASA Technical Reports Server (NTRS)
1988-01-01
This Draft Environmental Impact Statement (DEIS) addresses the environmental impacts which may be caused by the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle and the alternative of canceling further work on the mission. The launch configuration will use the STS/Inertial Upper Stage (IUS)/Payload Assist Module-Special (PAM-S) combination. The Tier 1 EIS included a delay alternative which considered the Titan 4 launch vehicle as an alternative booster stage for launch in 1991 or later. However, the U.S. Air Force, which procures the Titan 4 for NASA, could not provide a Titan 4 vehicle for the 1991 launch opportunity because of high priority Department of Defense requirements. The only expected environmental effects of the proposed action are associated with normal Shuttle launch operations. These impacts are limited largely to the near-field at the launch pad, except for temporary stratospheric ozone effects during launch and occasional sonic boom effects near the landing site. These effects have been judged insufficient to preclude Shuttle launches. In the event of: (1) an accident during launch, or (2) reentry of the spacecraft from earth orbit, there are potential adverse health and environmental effects associated with the possible release of plutonium dioxide from the spacecraft's radioisotope thermoelectric generators (RTG).
On-Orbit ACDS Performance of the Landsat 7 Spacecraft
NASA Technical Reports Server (NTRS)
Sabelhaus, Phillip; Bolek, Joseph; Scott, Steve; Holmes, Eric; O'Donnell, James R., Jr.; Storey, James
2001-01-01
Landsat 7 is part of NASA's Earth Science Enterprise (ESE). The ESE is committed to developing an understanding of the total Earth system, the effects of natural and human-induced changes on the global environment, and how natural processes affect humans and how humans affect them. The Landsat 7 satellite consists of the spacecraft bus which was provided under a NASA contract with Lockheed Martin Missiles and Space in Philadelphia, PA, and the Enhanced Thematic Mapper-Plus (ETM+) instrument, procured under a NASA contract with Raytheon Santa Barbara Remote Sensing, in Santa Barbara, CA. The Landsat 7 Attitude Control and Determination System (ACDS) provides many essential functions for the operation of the spacecraft bus and for ETM+. The ACDS maintains the required attitude and orbit at the degree of accuracy necessary for power generation, command and telemetry, thermal balance, image acquisition, Gimbaled X-Band Antenna (GXA) pointing and data for image post-processing. Descriptions of the Landsat 7 mission and the ACDS modes and requirements are presented. A brief summary of significant events of the on-orbit initialization and validation period are provided. Finally, the Landsat 7 product generation system is described and the impact that the ACDS performance has on the ground based image processing system is explored.
Chokshi, Maulik; Farooqui, Habib Hasan; Selvaraj, Sakthivel; Kumar, Preeti
2015-01-01
In India, access to medicine in the public sector is significantly affected by the efficiency of the drug procurement system and allied processes and policies. This study was conducted in two socioeconomically different states: Bihar and Tamil Nadu. Both have a pooled procurement system for drugs but follow different models. In Bihar, the volumes of medicines required are pooled at the state level and rate contracted (an open tender process invites bidders to quote for the lowest rate for the list of medicines), while actual invoicing and payment are done at district level. In Tamil Nadu, medicine quantities are also pooled at state level but payments are also processed at state level upon receipt of laboratory quality-assurance reports on the medicines. In this cross-sectional survey, a range of financial and non-financial data related to procurement and distribution of medicine, such as budget documents, annual reports, tender documents, details of orders issued, passbook details and policy and guidelines for procurement were analysed. In addition, a so-called ABC analysis of the procurement data was done to to identify high-value medicines. It was observed that Tamil Nadu had suppliers for 100% of the drugs on their procurement list at the end of the procurement processes in 2006, 2007 and 2008, whereas Bihar's procurement agency was only able to get suppliers for 56%, 59% and 38% of drugs during the same period. Further, it was observed that Bihar's system was fuelling irrational procurement; for example, fluconazole (antifungal) alone was consuming 23.4% of the state's drug budget and was being procured by around 34% of the districts during 2008-2009. Also, the ratios of procurement prices for Bihar compared with Tamil Nadu were in the range of 1.01 to 22.50. For 50% of the analysed drugs, the price ratio was more than 2, that is, Bihar's procurement system was procuring the same medicines at more than twice the prices paid by Tamil Nadu. Centralized, automated pooled procurement models like that of Tamil Nadu are key to achieving the best procurement prices and highest possible access to medicines.
Pooling procurement in the Belgian hospital sector.
Hebert, Guy
2011-01-01
The Belgian hospital sector is following the example of a number of other European countries and for more than ten years now, has been striving to pool its medical supplies and equipment purchases in a bid to reduce costs. The various experiments of which we are aware come under both opportunist purchases and initiatives which are designed to encourage local-regional contracts. These attempts have now all come to nothing or are struggling in the absence of a structured and professional approach. In 2005, the Saint Luc University Clinic in Brussels decided to set up a high-performance purchasing department, the aim being to centre its initiatives around TCO or Total Cost of Ownership. Following an analysis of the various experiments into pooling procurement in hospitals in Europe, the Saint Luc University Clinic decided on a central procurement agency model, in accordance with new legislation on public procurement. This article seeks to highlight the prerequisites which are vital for a procurement pooling initiative, without underestimating the risks and limitations of implementing such a change in procurement practices. The Mercure central procurement agency is now the largest interhospital purchasing structure in Belgium.
ITS procurement : analysis and recommendations.
DOT National Transportation Integrated Search
1994-01-01
Virginia has met with a variety of difficulties and delays in its procurement of intelligent transportation systems, components, and studies. The Fastoll Automatic Toll System was initiated in 1987, and construction has still not begun. It has been t...
Overview and Status of the Kepler Mission
NASA Technical Reports Server (NTRS)
Koch, D.; Borucki, W.; Dunham, E.; Geary, J.; Gilliland, R.; Jenkins, J.; Latham, D.; Mayer, D.; Sobeck, C.; Duren, R.
2003-01-01
The Kepler Mission is a search for terrestrial planets with the design optimized for detecting Earth-size planets in the habitable zone (HZ) of solar-like stars. In addition, the mission has a broad detection capability for a wide range of planetary sizes, planetary orbits and spectral types of stars. The mission is in the midst of the development phase with good progress leading to the preliminary design review later this year. Long lead procurements are well under way. An overview in all areas is presented including both the flight system (photometer and spacecraft) and the ground system. Launch is on target for 2007 on a Delta II.
NASA Pocket Statistics: 1997 Edition
NASA Technical Reports Server (NTRS)
1997-01-01
POCKET STATISTICS is published by the NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA). Included in each edition is Administrative and Organizational information, summaries of Space Flight Activity including the NASA Major Launch Record, Aeronautics and Space Transportation and NASA Procurement, Financial and Workforce data. The NASA Major Launch Record includes all launches of Scout class and larger vehicles. Vehicle and spacecraft development flights are also included in the Major Launch Record. Shuttle missions are counted as one launch and one payload, where free flying payloads are not involved. All Satellites deployed from the cargo bay of the Shuttle and placed in a separate orbit or trajectory are counted as an additional payload.
Competitive Advantage, Uncertainty, and Weapons Procurement: Striking Balance for the Future
2009-05-02
position of the Department of the Army, Department of Defense, or the U.S. Government. COMPETITIVE ADVANTAGE , UNCERTAINTY, AND WEAPONS PROCUREMENT: STRIKING...Competitive Advantage , Uncertainty, and Weapons Procurement: Striking Balance for the Future 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...the right balance of investments all leading to a sustained competitive advantage . This paper presents an analysis of how effective this overhaul has
VanderKnyff, Jeremy; Friedman, Daniela B; Tanner, Andrea
2015-01-01
Using a sample of YouTube videos posted on the YouTube channels of organ procurement organizations, a content analysis was conducted to identify the frames used to strategically communicate prodonation messages. A total of 377 videos were coded for general characteristics, format, speaker characteristics, organs discussed, structure, problem definition, and treatment. Principal components analysis identified message frames, and k-means cluster analysis established distinct groupings of videos on the basis of the strength of their relationship to message frames. Analysis of these frames and clusters found that organ procurement organizations present multiple, and sometimes competing, video types and message frames on YouTube. This study serves as important formative research that will inform future studies to measure the effectiveness of the distinct message frames and clusters identified.
The Wheelchair Procurement Process: Perspectives of Clients and Prescribers
Mortenson, William B; Miller, William C
2014-01-01
Back ground Increasing choices in assistive technology has made the process of procuring a wheelchair more complex and challenging. Purpose To explore the intricacies of the procurement process from the perspectives of clients and therapists. Methods Thirty-four participants were interviewed, including 13 wheelchair prescribers, 14 wheelchair users, and 7 wheelchair associates (family members and caregivers). Findings Analysis revealed five main themes. 1) “Who decides?” described varying degrees of client involvement in the procurement process. 2) “Expert knowledge” reflected the expert knowledge that all parties possessed. 3) “Form versus function” captured the primary and, at times, conflicting outcomes that participants wanted to achieve. 4) “Fitting in” depicted the environmental factors that affected wheelchair procurement. 5) “(Re)solutions” illustrated strategies that participants felt improved the process. Implications This study reveals clients’ experiences with wheelchair procurement, identifies potential issues therapists may encounter, and suggests possible remedies they might consider when prescribing wheelchairs within a client-centred framework. PMID:18615928
Critical analysis of procurement techniques in construction management sectors
NASA Astrophysics Data System (ADS)
Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad
2018-04-01
Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.
DOT National Transportation Integrated Search
2013-04-01
This study details the analysis of the Florida Transit Research Inspection Procurement Services (TRIPS) Program. It provides a comparative assessment of the program with respect to out-of-state practice, provides recommendations to improve life cycle...
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2014-04-01
Nearly 40% of Global Fund money goes toward procurement. However, no analyses have been published to show how costs vary across regions and time, despite the availability of procurement data collected through the Global Fund's price and quality reporting system. We analyzed data for the 3 most widely procured commodities for the prevention, diagnosis, and treatment of HIV. These were male condoms, HIV rapid tests, and the antiretroviral (ARV) combination of lamivudine/nevirapine/zidovudine. The compared costs, first across time (2005-2012), then across regions, and finally, between individual procurement reported through the price and quality reporting and pooled procurement reported through the Global Fund's voluntary pooled procurement system. All costs were adjusted for inflation and reported in US dollars. There were 2337 entries from 578 grants in 125 countries. The procurement cost for the ARV dropped substantially over the period, whereas those for condoms and HIV tests remained relatively stable. None of the commodity prices increased. Regional variations were pronounced for HIV tests, but minimal for condoms and the ARV. The unit cost for the 3-table ARV combination, for instance, varied between US$0.15 and US$0.23 in South Asia and the Eastern Europe/Central Asia regions, respectively, compared with a range of $0.23 (South Asia)-$1.50 (Eastern Europe/Central Asia) for a single diagnostic test. Pooled procurement lowered costs for condoms but not the other commodities. We showed how global procurement costs vary by region and time. Such analyses should be done more often to identify and correct market insufficiencies.
Analysis of Critical Parts and Materials
1980-12-01
1 1 1% 1% 1% 1% Large Orders Manual Ordering of Some Critical Parts Order Spares with Original Order Incentives Belter Capital Investment...demand 23 Large orders 24 Long lead procurement funding (including raw materials, facility funding) 25 Manpower analysis and training 26 Manual ... ordering of some critical parts 27 More active role in schedule negotiation 28 Multiple source procurements 29 Multi-year program funding 30 Order
Code of Federal Regulations, 2010 CFR
2010-10-01
... decision is made to initiate debarment and/or suspension of a contractor, the Senior Procurement Executive... the administrative file containing all relevant facts and analysis, must be forwarded to the Senior... counsel. (2) The Senior Procurement Executive shall: (i) Review the notice and administrative file for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis... most economical approach. (5) To foster greater economy and efficiency, grantees and subgrantees are... consistent with Federal cost principles (see § 13.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-04-01
... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis... most economical approach. (5) To foster greater economy and efficiency, grantees and subgrantees are... consistent with Federal cost principles (see § 85.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-07-01
... consolidating or breaking out procurements to obtain a more economical purchase. Where appropriate, an analysis... most economical approach. (5) To foster greater economy and efficiency, grantees and subgrantees are... consistent with Federal cost principles (see § 97.22). Grantees may reference their own cost principles that...
7 CFR 1780.70 - Owner's procurement regulations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... practices between firms; organizational conflicts of interest; and unnecessary experience and bonding... avoid the purchase of unnecessary or duplicate items. Consideration should be given to consolidation or separation of procurement items to obtain a more economical purchase. Where appropriate, an analysis shall be...
Dual Production Sources in the Procurement of Weapon Systems: A Policy Analysis
1983-11-01
Competitive Aspects of the AIM-9B Seeker Assembly Procurement, memorandum to Carl Wilbourn , U.S. Navy OP-96D, December 16, 1977. 3 sARINC Report, p...Corporation, R-2706-DR&E, February 1981. Carroll, Frank, Competitive Aspects of the AIM-9B Seeker Assembly Procurement, Memorandum to Carl Wilbourn , U.S...David J., and Joseph P. Large, Estimated Costs of Extended Low Rate Airframe Production, The Rand Corporation, R-2243-AF, March 1978, Fisher, Gene H
Butala, Neel M.; King, Marissa D.; Reitsma, William; Formica, Richard N.; Abt, Peter L.; Reese, Peter P.; Parikh, Chirag R.
2015-01-01
Background Given growth in kidney transplant waitlists and discard rates, donor kidney acceptance is an important problem. We used network analysis to examine whether organ procurement organization (OPO) network centrality affects discard and outcomes. Methods We identified 106,160 deceased-donor kidneys recovered for transplant from 2000–2010 in SRTR. We constructed the transplant network by year with each OPO representing a node and each kidney-sharing relationship between OPOs representing a directed tie between nodes. Primary exposures were the number of different OPOs to which an OPO has given a kidney or from which an OPO has received a kidney in year preceding procurement year. Primary outcomes were discard, cold-ischemia time, delayed graft function, and 1-year graft loss. We used multivariable regression, restricting analysis to the 50% of OPOs with highest discard and stratifying remaining OPOs by kidney volume. Models controlled for kidney donor risk index, waitlist time, and kidney pumping. Results An increase in one additional OPO to which a kidney was given by a procuring OPO in a year was associated with 1.4% lower likelihood of discard for a given kidney (odds ratio, 0.986; 95% confidence interval, 0.974-0.998) among OPOs procuring high kidney volume, but 2% higher likelihood of discard (OR:1.021, CI:1.006, 1.037) among OPOs procuring low kidney volume, with mixed associations with recipient outcomes. Conclusions Our study highlights the value of network analysis in revealing how broader kidney sharing is associated with levels of organ acceptance. We conclude interventions to promote broader inter-OPO sharing could be developed to reduce discard for a subset of OPOs. PMID:26102610
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... consistent with Federal cost principles (see § 602.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 1157.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 80.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-01-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 600.422). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 66.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-04-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 135.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-04-01
.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... consistent with Federal cost principles (see § 1403.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-10-01
... should be given to consolidating or breaking out procurements to obtain a more economical purchase. Where... analysis to determine the most economical approach. (5) To foster greater economy and efficiency, grantees... consistent with Federal cost principles (see § 18.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Consideration should be given to consolidating or breaking out procurements to obtain a more economical purchase... appropriate analysis to determine the most economical approach. (5) To foster greater economy and efficiency... consistent with Federal cost principles (see § 1174.22). Grantees may reference their own cost principles...
Thrailkill, Eric A.; Bouton, Mark E.
2015-01-01
Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response), and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, the present experiments asked the reverse question of whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains; extinction of one consumption response specifically weakened the procurement response associated with it. The results add to evidence suggesting that rats learn a highly specific associative structure in behavior chains, and emphasize the role of learning response inhibition in extinction. PMID:26276367
Thrailkill, Eric A; Bouton, Mark E
2016-03-01
Operant behavior is typically organized into sequences of responses that eventually lead to a reinforcer. Response elements can be categorized as those that directly lead to reward consumption (i.e., a consumption response) and those that lead to the opportunity to make the consumption response (i.e., a procurement response). These responses often differ topographically and in terms of the discriminative stimuli that set the occasion for them. We have recently shown that extinction of the procurement response acts to weaken the specific associated consumption response, and that active inhibition of the procurement response is required for this effect. To expand the analysis of the associative structure of chains, in the present experiments we asked the reverse question: whether extinction of consumption behavior results in a decrease in the associated procurement response in a discriminated heterogeneous chain. In Experiment 1, extinction of consumption alone led to an attenuation of the associated procurement response only when rats were allowed to make the consumption response in extinction. Exposure to the consumption stimulus alone was not sufficient to produce weakened procurement responding. In Experiment 2, rats learned two distinct heterogeneous chains, and extinction of one consumption response specifically weakened the procurement response associated with it. The results add to the evidence suggesting that rats learn a highly specific associative structure in behavior chains, emphasizing the role of learning response inhibition in extinction.
2014-01-01
Background Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. Methods ARV drug procurement from private sector sources for the years 2004–2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil’s national treatment guidelines. Results Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Conclusions Drug procurement and expenditures for ARVs in Brazil varied between 2004–2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing. PMID:24735589
Luo, Jing; Oliveira, Maria A; Ramos, Mariana B C; Maia, Aurélio; Osorio-de-Castro, Claudia G S
2014-04-16
Previous studies have described expenditures for antiretroviral (ARV) medicines in Brazil through 2005. While prior studies examined overall expenditures, they have not have analyzed drug procurement data in order to describe the role of court litigation on access and pricing. ARV drug procurement from private sector sources for the years 2004-2011 was obtained through the general procurement database of the Brazilian Federal Government (SIASG). Procurement was measured in Defined Daily Doses (DDD) per 1000 persons-under-treatment per day. Expenditures and price per DDD were calculated and expressed in U.S. Dollars. Justifications for ARV purchases were examined in order to determine the relationship between health litigation and incorporation into Brazil's national treatment guidelines. Drug procurement of ARVs from private sources underwent marked expansion in 2005, peaked in 2009, and stabilized to 2008 levels by 2011. Expenditures followed procurement curves. Medications which were procured for the first time after 2007 cost more than medicines which were introduced before 2007. Judicial actions initially resulted in purchases of newer medications for a select number of patients in Brazil but ultimately expanded availability to a larger population through incorporation into the national treatment guidelines. Drug procurement and expenditures for ARVs in Brazil varied between 2004-2011. The procurement of some drugs from the private sector ceased after public manufacturers started producing them locally. Judicial demand has resulted in the incorporation of newer drugs into the national treatment guidelines. In order for the AIDS treatment program to remain sustainable, efforts should be pursued to reduce prices through generic drugs, price negotiation and other public health flexibilities such as compulsory licensing.
DISPLA: decision information system for procurement and logistics analysis
NASA Astrophysics Data System (ADS)
Calvo, Alberto B.; Danish, Alexander J.; Lamonakis, Gregory G.
2002-08-01
This paper describes an information-exchange system for Display systems acquisition and logistics support. DISPLA (Decision Information System for Procurement and Logistics Analysis) is an Internet-based system concept for bringing sellers (display system and component suppliers) and buyers (Government Program Offices and System Integrators) together in an electronic exchange to improve the acquisition and logistics analysis support of Flat Panel Displays for the military. A proof-of-concept demonstration is presented in this paper using sample data from vendor Web sites and Government data sources.
Perez-Protto, S; Nazemian, R; Matta, M; Patel, P; Wagner, K J; Latifi, S Q; Lebovitz, D J; Reynolds, J D
2018-03-01
Many deceased by neurologic criteria donors are administered inhalational agents during organ recovery surgery-a process that is characterised by warm and cold ischaemia followed by warm reperfusion. In certain settings, volatile anaesthetics (VA) are known to precondition organs to protect them from subsequent ischaemia-reperfusion injury. As such, we hypothesised that exposure to VA during organ procurement would improve post-graft survival. Lifebanc (organ procurement organisation [OPO] for NE Ohio) provided the investigators with a list of death by neurologic criteria organ donors cared for at three large tertiary hospitals in Cleveland between 2006 and 2016-details about the surgical recovery phase were extracted from the organ donors' medical records. De-identified data on graft survival were obtained from the United Network for Organ Sharing (UNOS). The collated data underwent comparative analysis based on whether or not VA were administered during procurement surgery. Records from 213 donors were obtained for analysis with 138 exposed and 75 not exposed. Demographics, medical histories, and organ procurement rates were similar between the two cohorts. For the primary endpoint, there were no significant differences observed in either early (30-day) or late (five-year) graft survival rates for kidney, liver, lung, or heart transplants. Our findings from this retrospective review of a relatively small cohort do not support the hypothesis that the use of VA during the surgical procurement phase improves graft survival. Reviews of larger datasets and/or a prospective study may be required to provide a definitive answer.
Assurance of COTS Boards for Space Flight. Part 1
NASA Technical Reports Server (NTRS)
Plante, Jeannette; Helmold, Norm; Eveland, Clay
1998-01-01
Space Flight hardware and software designers are increasingly turning to Commercial-Off-the-Shelf (COTS) products in hopes of meeting the demands imposed on them by projects with short development cycle times. The Technology Validation Assurance (TVA) team at NASA GSFC has embarked on applying a method for inserting COTS hardware into the Spartan 251 spacecraft. This method includes Procurement, Characterization, Ruggedization/Remediation and Verification Testing process steps which are intended to increase the uses confidence in the hardware's ability to function in the intended application for the required duration. As this method is refined with use, it has the potential for becoming a benchmark for industry-wide use of COTS in high reliability systems.
NASA Technical Reports Server (NTRS)
Free, James M.
1993-01-01
This paper assesses the feasibility of using eddy current nondestructive examination to determine flaw sizes in completely assembled hydrazine propellant tanks. The study was performed by the NASA Goddard Space Flight Center for the Tropical Rainfall Measuring Mission (TRMM) project to help determine whether existing propellant tanks could meet the fracture analysis requirements of the current pressure vessel specification, MIL-STD-1522A and, therefore be used on the TRMM spacecraft. After evaluating several nondestructive test methods, eddy current testing was selected as the most promising method for determining flaw sizes on external and internal surfaces of completely assembled tanks. Tests were conducted to confirm the detection capability of the eddy current NDE, procedures were developed to inspect two candidate tanks, and the test support equipment was designed. The non-spherical tank eddy current NDE test program was terminated when the decision was made to procure new tanks for the TRMM propulsion subsystem. The information on the development phase of this test program is presented in this paper as a reference for future investigation on the subject.
Teichgräber, Ulf K; de Bucourt, Maximilian
2012-01-01
OJECTIVES: To eliminate non-value-adding (NVA) waste for the procurement of endovascular stents in interventional radiology services by applying value stream mapping (VSM). The Lean manufacturing technique was used to analyze the process of material and information flow currently required to direct endovascular stents from external suppliers to patients. Based on a decision point analysis for the procurement of stents in the hospital, a present state VSM was drawn. After assessment of the current status VSM and progressive elimination of unnecessary NVA waste, a future state VSM was drawn. The current state VSM demonstrated that out of 13 processes for the procurement of stents only 2 processes were value-adding. Out of the NVA processes 5 processes were unnecessary NVA activities, which could be eliminated. The decision point analysis demonstrated that the procurement of stents was mainly a forecast driven push system. The future state VSM applies a pull inventory control system to trigger the movement of a unit after withdrawal by using a consignment stock. VSM is a visualization tool for the supply chain and value stream, based on the Toyota Production System and greatly assists in successfully implementing a Lean system. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-08
... elements of the Department of Homeland Security concerned with the analysis of intelligence information... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 RIN 0750-AG67 Defense Federal Acquisition Regulation Supplement; Limitations on Procurements With Non-Defense Agencies (DFARS...
2016-01-01
evaluation method that identifies the root causes of an undesired outcome and the Summary xix Root Cause of the JPALS Nunn-McCurdy Breach Under current... evaluation (RDT&E) unit (from 12 to 11) and an increase of one procurement unit for a new total of 27 procurement units. The revised procurement quantity...from the status of the overall portfolio of MDAPs and the status of other subportfolios. In assessing a portfolio, analysts may need to evaluate the
A Least Cost Study for Book Procurement at the Naval Postgraduate School Library
1990-06-01
NAVAL POSTGRADUATE SCHOOL Monterey, California S7GR W DTIC &ELECTF ~jj N30 1 991TAES 0)0 THESIS B A LEAST COST STUDY FOR BOOK PROCUREMENT AT THE...Monterey, California 93943-5000 Monterey, California 93943-5000 C’ ’. z - I l a-, -.~,:IV A LEAST COST STUDY FOR BOOK PROCUREMENT AT THE NAVAL...Cost Study . , A . O -’U] aL’,"- ) t’ ’’- The primary objective of this thesis is to perform a cost effective- ness analysis of the various purchasing
1999-10-01
Technical Report 5-20448 & 5- 20449 Contract No. DAAH01-98-D-R001 Delivery Order No. 34 Microelectronics Status Analysis and Secondary Part...Procureability Assessment of the THAAD Weapon System. (5-20448 & 5- 20449 ) Final Technical Report for Period 21 January 1999 through 30 September 1999...Huntsville Huntsville, AL 35899 5. FUNDING NUMBERS 8. PERFORMING ORGANIZATION REPORT NUMBER 5-20448 & 5- 20449 9. SPONSORING/MONITORING AGENCY
Crew-Aided Autonomous Navigation
NASA Technical Reports Server (NTRS)
Holt, Greg N.
2015-01-01
A sextant provides manual capability to perform star/planet-limb sightings and offers a cheap, simple, robust backup navigation source for exploration missions independent from the ground. Sextant sightings from spacecraft were first exercised in Gemini and flew as the lost-communication backup for all Apollo missions. This study characterized error sources of navigation-grade sextants for feasibility of taking star and planetary limb sightings from inside a spacecraft. A series of similar studies was performed in the early/mid-1960s in preparation for Apollo missions. This study modernized and updated those findings in addition to showing feasibility using Linear Covariance analysis techniques. The human eyeball is a remarkable piece of optical equipment and provides many advantages over camera-based systems, including dynamic range and detail resolution. This technique utilizes those advantages and provides important autonomy to the crew in the event of lost communication with the ground. It can also provide confidence and verification of low-TRL automated onboard systems. The technique is extremely flexible and is not dependent on any particular vehicle type. The investigation involved procuring navigation-grade sextants and characterizing their performance under a variety of conditions encountered in exploration missions. The JSC optical sensor lab and Orion mockup were the primary testing locations. For the accuracy assessment, a group of test subjects took sextant readings on calibrated targets while instrument/operator precision was measured. The study demonstrated repeatability of star/planet-limb sightings with bias and standard deviation around 10 arcseconds, then used high-fidelity simulations to verify those accuracy levels met the needs for targeting mid-course maneuvers in preparation for Earth reen.
Wafula, Francis; Agweyu, Ambrose; Macintyre, Kate
2013-12-30
Although procurement consumes nearly 40% of Global Fund's money, no analyses have been published to show how costs vary across regions and time. This paper presents an analysis of malaria-related commodity procurement data from 79 countries, as reported through the Global Fund's price and quality reporting (PQR) system for the 2005-2012 period. Data were analysed for the three most widely procured commodities for prevention, diagnosis and treatment of malaria. These were long-lasting insecticide-treated nets (LLINs), malaria rapid diagnostic tests (RDTs) and the artemether/lumefantrine (AL) combination treatment. Costs were compared across time (2005-2012), regions, and between individual procurement reported through the PQR and pooled procurement reported through the Global Fund's voluntary pooled procurement (VPP) system. All costs were adjusted for inflation and reported in US dollars. The data included 1,514 entries reported from 79 countries over seven years. Of these, 492 entries were for LLINs, 330 for RDTs and 692 for AL. Considerable variations were seen by commodity, although none showed an increase in cost. The costs for LLINs, RDTs and AL all dropped significantly over the period of analysis. Regional variations were also seen, with the cost for all three commodities showing significant variations. The median cost for a single LLIN ranged from USD 4.3 in East Asia to USD 5.0 in West and Central Africa. The cost of a single RDT was lowest in West and Central Africa at US$ 0.57, and highest in the Latin American region at US$ 1.1. AL had the narrowest margin of between US$ 0.06 per tablet in sub-Saharan Africa and South Asia, and US$ 0.08 in the Latin American and Eastern Europe regions. This paper concludes that global procurement costs do vary by region and have reduced overall over time. This suggests a mature market is operating when viewed from the global level, but regional variation needs further attention. Such analyses should be done more often to identify and correct market insufficiencies.
Procurement of alcohol and underage drinking among adolescents in Ontario.
Smart, R G; Adlaf, E M; Walsh, G W
1996-07-01
The purpose of this article is to examine the procurement of alcohol among underage drinkers. The data are based on a survey of 3,571 students in Ontario schools. Underage drinkers were those younger than 19 years of age. Data were gathered with an anonymous questionnaire administered in classrooms in 1992. The data include descriptive analysis of underage procurement and a cluster analysis of underage drinker types (n = 1,125: 566 female). Most students found alcohol easy to obtain, with the most common access being from parents' supplies or older friends. Four types of underage drinkers were identified: bar drinkers (5%), frequent purchasers (10%), frequent obtainers (3%) and infrequent obtainers (83%). Frequent self purchasers and infrequent secondary purchasers have the highest levels of consumption and problems. However, most underage drinkers report no problems.
Medical device procurement in low- and middle-income settings: protocol for a systematic review.
Diaconu, Karin; Chen, Yen-Fu; Manaseki-Holland, Semira; Cummins, Carole; Lilford, Richard
2014-10-21
Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic.
Factors influencing global antiretroviral procurement prices.
Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio
2009-11-18
Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.
Medical device procurement in low- and middle-income settings: protocol for a systematic review
2014-01-01
Background Medical device procurement processes for low- and middle-income countries (LMICs) are a poorly understood and researched topic. To support LMIC policy formulation in this area, international public health organizations and research institutions issue a large body of predominantly grey literature including guidelines, manuals and recommendations. We propose to undertake a systematic review to identify and explore the medical device procurement methodologies suggested within this and further literature. Procurement facilitators and barriers will be identified, and methodologies for medical device prioritization under resource constraints will be discussed. Methods/design Searches of both bibliographic and grey literature will be conducted to identify documents relating to the procurement of medical devices in LMICs. Data will be extracted according to protocol on a number of pre-specified issues and variables. First, data relating to the specific settings described within the literature will be noted. Second, information relating to medical device procurement methodologies will be extracted, including prioritization of procurement under resource constraints, the use of evidence (e.g. cost-effectiveness evaluations, burden of disease data) as well as stakeholders participating in procurement processes. Information relating to prioritization methodologies will be extracted in the form of quotes or keywords, and analysis will include qualitative meta-summary. Narrative synthesis will be employed to analyse data otherwise extracted. The PRISMA guidelines for reporting will be followed. Discussion The current review will identify recommended medical device procurement methodologies for LMICs. Prioritization methods for medical device acquisition will be explored. Relevant stakeholders, facilitators and barriers will be discussed. The review is aimed at both LMIC decision makers and the international research community and hopes to offer a first holistic conceptualization of this topic. PMID:25336161
2015-09-01
agreement PBL performance based logistics PCO procuring contracting officer PHS&T packaging, handling, storage & transportation PM program manager...from which a program manager must decide, with the assistance of the program’s Procurement Contracting Officer ( PCO ). As one of the key tenets of PBL, a
ERIC Educational Resources Information Center
Jilcott, Stephanie B.; Moore, Justin B.; Wall-Bassett, Elizabeth D.; Liu, Haiyong; Saelens, Brian E.
2011-01-01
Objective: To examine associations between self-reported vehicular travel behaviors, perceived stress, food procurement practices, and body mass index among female Supplemental Nutrition Assistance Program (SNAP) participants. Analysis: The authors used correlation and regression analyses to examine cross-sectional associations between travel time…
Tang, Yuqing; Liu, Chaojie; Zhang, Xinping
2017-02-01
The low availability of essential medicines is a worldwide issue of concern. In 2009, China introduced a National Essential Medicines List (NEML), with NEML medicines being purchased in bulk at contracted prices established by tenders conducted at the provincial level. The availability of essential medicines in the public sector largely relies on commercial supply chains. The objectives of this paper were to analyze the delivery performance of essential medicines under NEML provincial procurement arrangements, and to determine whether the procurement volume and price of medicines are associated with the delivery performance of suppliers. We reviewed 9390 recorded orders of 1099 essential medicines in Hubei province from August 2011 to April 2012. The reliability of medicine delivery in-full and on-time (DIFOT) was considered the performance indicator, and we used Spearman correlation analyses to explore whether there were any associations between DIFOT and procurement price and volume. Quantile regressions were performed to determine such associations. The DIFOT had positive correlations with procurement price and volume. The Spearman rank correlation coefficients between price and DIFOT were 0.114, 0.34 and 0.25 for medicines with low one-third, middle one-third and high one-third procurement volumes, respectively. The quantile regression analysis revealed a positive association between price and DIFOT across all quantiles of DIFOT, and although significant positive associations between volume and DIFOT were only found at the 25th percentile of DIFOT, volume showed significant interactions with price for both the 25th and 50th percentiles of DIFOT. Higher procurement price is associated with better delivery performance of essential medicines; however, it is important to link procurement price with procurement volume. Increasing procurement volume may alleviate the negative effect of low price on delivery performance. Variation in volumes of repeated orders imposes uncertainties and may jeopardize the delivery of essential medicines.
A registry analysis of damage to the deceased donor pancreas during procurement.
Ausania, F; Drage, M; Manas, D; Callaghan, C J
2015-11-01
Surgical injury to the pancreas is thought to occur commonly during procurement. The UK Transplant Registry was analyzed to determine the frequency of pancreatic injuries, identify factors associated with damage, and assess the impact of injuries on graft survival. Twelve hundred ninety-six pancreata were procured from donation after brain death donors, with 314 (19.5%) from donation after circulatory death donors. More than 50% of recovered pancreata had at least one injury, most commonly a short portal vein (21.5%). Liver donation, procurement team origin, hepatic artery (HA) arising from the superior mesenteric artery (SMA), and increasing donor BMI were associated with increased rates of pancreas damage on univariate analyses; on multivariate analysis only the presence of an HA from the SMA remained significant (p = 0.02). Six hundred forty solid organ pancreas transplants were performed; 238 had some form of damage. Overall, there was no difference in graft survival between damaged and undamaged organs (p = 0.28); however, graft loss was significantly more frequent in pancreata with arterial damage (p = 0.04) and in those with parenchymal damage (p = 0.05). Damage to the pancreas during organ recovery is more common than other organs, and meticulous surgical technique and awareness of damage risk factors are essential to reduce rates of procurement-related injuries. © Copyright 2015 The American Society of Transplantation and the American Society of Transplant Surgeons.
Geographic information system-based spatial analysis of sawmill wood procurement
Nathaniel M. Anderson; Rene H. Germain; Eddie Bevilacqua
2011-01-01
In the sawmill sector of the forest products industry, the clustering of mills and wide variation in forest stocking and ownership result in sawlog markets that are complex and spatially differentiated. Despite the inherent spatial attributes of markets for stumpage and logs, few studies have used geospatial methods to examine wood procurement in detail across...
Moronkola, O A; Amosu, A; Okonkwo, C
Of 1,200 questionnaires administered in a cross-sectional study involving University of Ibadan female students, 1000 were found useable for data analysis. Analysis found that a majority of respondents (56.4%) had little knowledge about conception and frequently engaged in sexual intercourse for many reasons, including: to have fun; to show they were mature; and to seek material reward. Also, 61.1% had procured abortion before and most of them did not procure it from government-owned hospitals/clinics, which may likely make them prone to health consequences of unsafe abortion. Part of our recommendations are the need to introduce health education (incorporating sexuality education) into the General Studies Program of the university and that home training on aspects relating to sexuality education be given to and promoted among young people.
Anema, Aranka; Fielden, Sarah J; Shurgold, Susan; Ding, Erin; Messina, Jennifer; Jones, Jennifer E; Chittock, Brian; Monteith, Ken; Globerman, Jason; Rourke, Sean B; Hogg, Robert S
2016-01-01
People living with HIV in high-resource settings suffer severe levels of food insecurity; however, limited evidence exists regarding dietary intake and sub-components that characterize food insecurity (i.e. food quantity, quality, safety or procurement) in this population. We examined the prevalence and characteristics of food insecurity among people living with HIV across British Columbia, Canada. This cross-sectional analysis was conducted within a national community-based research initiative. Food security was measured using the Health Canada Household Food Security Scale Module. Logistic regression was used to determine key independent predictors of food insecurity, controlling for potential confounders. Of 262 participants, 192 (73%) reported food insecurity. Sub-components associated with food insecurity in bivariate analysis included: < RDI consumption of protein (p = 0.046); being sick from spoiled/unsafe food in the past six months (p = 0.010); and procurement of food using non-traditional methods (p <0.05). In multivariable analyses, factors significantly associated with food insecurity included: procurement of food using non-traditional methods [AOR = 11.11, 95% CI: 4.79-25.68, p = <0.001]; younger age [AOR = 0.92, 95% CI: 0.86-0.96, p = <0.001]; unstable housing [AOR = 4.46, 95% CI: 1.15-17.36, p = 0.031]; household gross annual income [AOR = 4.49, 95% CI: 1.74-11.60, p = 0.002]; and symptoms of depression [AOR = 2.73, 95% CI: 1.25-5.96, p = 0.012]. Food insecurity among people living with HIV in British Columbia is characterized by poor dietary quality and food procurement methods. Notably, participants who reported procuring in non-traditional manners were over 10 times more likely to be food insecure. These findings suggest a need for tailored food security and social support interventions in this setting.
Discovery: Under the Microscope at Kennedy Space Center
NASA Technical Reports Server (NTRS)
Howard, Philip M.
2013-01-01
The National Aeronautics & Space Administration (NASA) is known for discovery, exploration, and advancement of knowledge. Since the days of Leeuwenhoek, microscopy has been at the forefront of discovery and knowledge. No truer is that statement than today at Kennedy Space Center (KSC), where microscopy plays a major role in contamination identification and is an integral part of failure analysis. Space exploration involves flight hardware undergoing rigorous "visually clean" inspections at every step of processing. The unknown contaminants that are discovered on these inspections can directly impact the mission by decreasing performance of sensors and scientific detectors on spacecraft and satellites, acting as micrometeorites, damaging critical sealing surfaces, and causing hazards to the crew of manned missions. This talk will discuss how microscopy has played a major role in all aspects of space port operations at KSC. Case studies will highlight years of analysis at the Materials Science Division including facility and payload contamination for the Navigation Signal Timing and Ranging Global Positioning Satellites (NA VST AR GPS) missions, quality control monitoring of monomethyl hydrazine fuel procurement for launch vehicle operations, Shuttle Solids Rocket Booster (SRB) foam processing failure analysis, and Space Shuttle Main Engine Cut-off (ECO) flight sensor anomaly analysis. What I hope to share with my fellow microscopists is some of the excitement of microscopy and how its discoveries has led to hardware processing, that has helped enable the successful launch of vehicles and space flight missions here at Kennedy Space Center.
Generalized Analysis Tools for Multi-Spacecraft Missions
NASA Astrophysics Data System (ADS)
Chanteur, G. M.
2011-12-01
Analysis tools for multi-spacecraft missions like CLUSTER or MMS have been designed since the end of the 90's to estimate gradients of fields or to characterize discontinuities crossed by a cluster of spacecraft. Different approaches have been presented and discussed in the book "Analysis Methods for Multi-Spacecraft Data" published as Scientific Report 001 of the International Space Science Institute in Bern, Switzerland (G. Paschmann and P. Daly Eds., 1998). On one hand the approach using methods of least squares has the advantage to apply to any number of spacecraft [1] but is not convenient to perform analytical computation especially when considering the error analysis. On the other hand the barycentric approach is powerful as it provides simple analytical formulas involving the reciprocal vectors of the tetrahedron [2] but appears limited to clusters of four spacecraft. Moreover the barycentric approach allows to derive theoretical formulas for errors affecting the estimators built from the reciprocal vectors [2,3,4]. Following a first generalization of reciprocal vectors proposed by Vogt et al [4] and despite the present lack of projects with more than four spacecraft we present generalized reciprocal vectors for a cluster made of any number of spacecraft : each spacecraft is given a positive or nul weight. The non-coplanarity of at least four spacecraft with strictly positive weights is a necessary and sufficient condition for this analysis to be enabled. Weights given to spacecraft allow to minimize the influence of some spacecraft if its location or the quality of its data are not appropriate, or simply to extract subsets of spacecraft from the cluster. Estimators presented in [2] are generalized within this new frame except for the error analysis which is still under investigation. References [1] Harvey, C. C.: Spatial Gradients and the Volumetric Tensor, in: Analysis Methods for Multi-Spacecraft Data, G. Paschmann and P. Daly (eds.), pp. 307-322, ISSI SR-001, 1998. [2] Chanteur, G.: Spatial Interpolation for Four Spacecraft: Theory, in: Analysis Methods for Multi-Spacecraft Data, G. Paschmann and P. Daly (eds.), pp. 371-393, ISSI SR-001, 1998. [3] Chanteur, G.: Accuracy of field gradient estimations by Cluster: Explanation of its dependency upon elongation and planarity of the tetrahedron, pp. 265-268, ESA SP-449, 2000. [4] Vogt, J., Paschmann, G., and Chanteur, G.: Reciprocal Vectors, pp. 33-46, ISSI SR-008, 2008.
NASA Technical Reports Server (NTRS)
Harkness, J. D.
1976-01-01
An evaluation test program was conducted to insure that all cells put into the life cycle program are of high quality by the screening of cells found to have electrolyte leakage, internal shorts, low capacity, or inability of any cell to recover its open-circuit voltage above 1.150 volts during the internal short test. The 20 cells were manufactured for the National Aeronautics and Space Administration, Goddard Space Flight Center (GSFC). The cells are from a lot of 175 cells procured for the International Ultraviolet Explorer project. Due to a change in requirements, the project selected to use 6.0 ampere-hour cells. Therefore, the remaining cells of this lot have been placed in storage at GSFC for use on a future GSFC project. All the cells are rated at 12.0 ampere-hours and contain double ceramic seals. Test limits specify those values in which a cell is to be terminated from a particular charge or discharge. Requirements are referred to as normally expected values based on past performance of aerospace nickel cadmium cells with demonstrated life characteristics.
Assessing bone banking activities at University of Malaya medical centre.
Mohd, Suhaili; Samsuddin, Sharifah Mazni; Ramalingam, Saravana; Min, Ng Wuey; Yusof, Norimah; Zaman, T Kamarul; Mansor, Azura
2015-12-01
The main advantage of establishing in-house bone banks is its ability to readily provide allograft bones for local surgeries. Bone procurement activities of our university bone bank during the 10 years of operation were reviewed. Socio-demographic data of donors, types of bone procured, cases of rejected bones and types of allograft bones transplanted are presented. From 179 potential donors, 73 % were accepted with 213 procured bones. Femoral head was the common bone transplanted (45 %), as it was also the most common procured (82 %). Bones were rejected mainly due to non-technical reasons (83 %) rather than positive results of microbiological (13 %) and serological (4 %) tests. Comprehensive data could not be obtained for further analysis due to difficulties in retrieving information. Therefore, quality assurance system was improved to establish more systematic documentations, as the basis of good banking practice with process control hence allowing traceability.
Interactive design and analysis of future large spacecraft concepts
NASA Technical Reports Server (NTRS)
Garrett, L. B.
1981-01-01
An interactive computer aided design program used to perform systems level design and analysis of large spacecraft concepts is presented. Emphasis is on rapid design, analysis of integrated spacecraft, and automatic spacecraft modeling for lattice structures. Capabilities and performance of multidiscipline applications modules, the executive and data management software, and graphics display features are reviewed. A single user at an interactive terminal create, design, analyze, and conduct parametric studies of Earth orbiting spacecraft with relative ease. Data generated in the design, analysis, and performance evaluation of an Earth-orbiting large diameter antenna satellite are used to illustrate current capabilities. Computer run time statistics for the individual modules quantify the speed at which modeling, analysis, and design evaluation of integrated spacecraft concepts is accomplished in a user interactive computing environment.
Exploring the relationship between planning and procurement in Western U.S. electric utilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carvallo Bodelon, Juan Pablo; Sanstad, Alan H.; Larsen, Peter H.
Integrated resource planning (IRP) is an important regulatory process used in many U.S. states to formulate and evaluate least-cost and risk-assessed portfolios to meet future load requirements for electric utilities. In principle, effective implementation of IRP seeks to assure regulators and the public that utility investment decisions, given uncertainty, are as cost-effective as possible. However, to date, there is no empirical assessment on the effectiveness of IRP implementation. In this analysis, we compare planning, procurement processes and actual decisions for a sample of twelve load serving entities (LSEs) across the Western U. S. from 2003-2014. The 2008/2009 recession provides amore » unique “stress test” to the planning process and offers an excellent opportunity to trace how procurement decisions responded to this largely unforeseen event. In aggregate, there is a general alignment between planned and procured supply-side capacity. However, there are significant differences in the choice of supply-side resources and type of ownership for individual LSEs. We develop case studies for three LSEs and find that subsequent plans differ significantly due to changes in the planning environment and that procurement decisions in some cases are impacted by factors that are not accounted for in the planning process. Our results reveal that a limited amount of information produced during the long-term planning process (e.g., forecasts, methods, and least cost/risk portfolios) are ultimately used during the procurement process, and that the latter process relies extensively on the most recent information available for decision making. These findings suggest that states' IRP rules and regulations mandating long-term planning horizons with the same analytical complexity throughout the planning period may not create useful information for the procurement process. The social value of a long-term planning process that departs from procurement and the balance between transparency and complexity of the planning and procurement processes is an open question.« less
Factors influencing global antiretroviral procurement prices
2009-01-01
Background Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. Methods An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Results Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. Conclusion One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this. PMID:19922690
Analysis of Lunar Surface Charging for a Candidate Spacecraft Using NASCAP-2K
NASA Technical Reports Server (NTRS)
Parker, Linda; Minow, Joseph; Blackwell, William, Jr.
2007-01-01
The characterization of the electromagnetic interaction for a spacecraft in the lunar environment, and identification of viable charging mitigation strategies, is a critical lunar mission design task, as spacecraft charging has important implications both for science applications and for astronaut safety. To that end, we have performed surface charging calculations of a candidate lunar spacecraft for lunar orbiting and lunar landing missions. We construct a model of the spacecraft with candidate materials having appropriate electrical properties using Object Toolkit and perform the spacecraft charging analysis using Nascap-2k, the NASA/AFRL sponsored spacecraft charging analysis tool. We use nominal and atypical lunar environments appropriate for lunar orbiting and lunar landing missions to establish current collection of lunar ions and electrons. In addition, we include a geostationary orbit case to demonstrate a bounding example of extreme (negative) charging of a lunar spacecraft in the geostationary orbit environment. Results from the charging analysis demonstrate that minimal differential potentials (and resulting threat of electrostatic discharge) occur when the spacecraft is constructed entirely of conducting materials, as expected. We compare charging results to data taken during previous lunar orbiting or lunar flyby spacecraft missions.
Energy-efficient Public Procurement: Best Practice in Program Delivery
DOE Office of Scientific and Technical Information (OSTI.GOV)
Payne, Christopher; Weber, Andrew; Semple, Abby
2013-02-15
This document illustrates the key issues and considerations involved in implementing energy-efficient public procurement. Our primary sources of information have been our partners in the Super Efficient Equipment and Appliance Deployment (SEAD) Initiative Procurement Working Group. Where applicable, we have highlighted specific ways in which working group participants have successfully overcome barriers to delivering effective programs. The following key points emerge from this analysis of programs for energy-efficient public procurement. Lessons for both developed and developing programs are highlighted throughout the guide. 1. Policy: Policy provides the initiative to begin a transition from first cost to life-cycle cost based purchasingmore » methods and culture. Effective policy is well-communicated, establishes accountability from top to bottom of organizations and simplifies the processes necessary to comply. Flexibility and responsiveness are essential in policy development and implementation. Mandatory and voluntary policies may complement one another. 2. Procurement Criteria: Procurement staff must be confident that energy-efficient procurement criteria offer the best long-term value for their organization’s money and represent real environmental gains. Involving multiple stakeholders at the early stages of the criteria creation process can result in greater levels of cooperation from private industry. Criteria should make comparison of products easy for purchasers and require minimal additional calculations. Criteria will need to be regularly updated to reflect market developments. 3. Training: Resources for the creation of training programs are usually very limited, but well-targeted training is necessary in order for a program to be effective. Training must emphasize a process that is efficient for purchasers and simplifies compliance. Purchaser resources and policy must be well designed for training to be effective. Training program development is an excellent opportunity for collaboration amongst public authorities. 4. Procurement Processes: Many tools and guides intended to help buyers comply with energy-efficient procurement policy are designed without detailed knowledge of the procurement process. A deeper understanding of purchasing pathways allows resources to be better directed. Current research by national and international bodies aims to analyze purchasing pathways and can assist in developing future resources.« less
SHARP: Automated monitoring of spacecraft health and status
NASA Technical Reports Server (NTRS)
Atkinson, David J.; James, Mark L.; Martin, R. Gaius
1991-01-01
Briefly discussed here are the spacecraft and ground systems monitoring process at the Jet Propulsion Laboratory (JPL). Some of the difficulties associated with the existing technology used in mission operations are highlighted. A new automated system based on artificial intelligence technology is described which seeks to overcome many of these limitations. The system, called the Spacecraft Health Automated Reasoning Prototype (SHARP), is designed to automate health and status analysis for multi-mission spacecraft and ground data systems operations. The system has proved to be effective for detecting and analyzing potential spacecraft and ground systems problems by performing real-time analysis of spacecraft and ground data systems engineering telemetry. Telecommunications link analysis of the Voyager 2 spacecraft was the initial focus for evaluation of the system in real-time operations during the Voyager spacecraft encounter with Neptune in August 1989.
SHARP - Automated monitoring of spacecraft health and status
NASA Technical Reports Server (NTRS)
Atkinson, David J.; James, Mark L.; Martin, R. G.
1990-01-01
Briefly discussed here are the spacecraft and ground systems monitoring process at the Jet Propulsion Laboratory (JPL). Some of the difficulties associated with the existing technology used in mission operations are highlighted. A new automated system based on artificial intelligence technology is described which seeks to overcome many of these limitations. The system, called the Spacecraft Health Automated Reasoning Prototype (SHARP), is designed to automate health and status analysis for multi-mission spacecraft and ground data systems operations. The system has proved to be effective for detecting and analyzing potential spacecraft and ground systems problems by performing real-time analysis of spacecraft and ground data systems engineering telemetry. Telecommunications link analysis of the Voyager 2 spacecraft was the initial focus for evaluation of the system in real-time operations during the Voyager spacecraft encounter with Neptune in August 1989.
Nuclear Matrix Proteins in Disparity of Prostate Cancer
2013-09-01
nuclear coactivator-3 (NCOA3). 5 Methods Patients and Prostate Cancer Specimens Fresh, flash -frozen specimens were obtained from age- (50 to...for reliable data interpretation. Gene Array Analysis Total RNA isolated from LCM-procured normal epithelium and tumor cells from flash -frozen...PCR Briefly, RNA was extracted from matched LCM procured normal epithelium and tumor cells of age-, tumor grade-matched flash -frozen sections (n=24
Competitiveness in the Services Sector: Understanding the Contracting Data
2012-09-01
Retrieved from http://www.acq.osd.mil/osbp/sbir/sb/eligibility.shtml Denes, T. A. (1997). Do small business set - asides increase the cost of...comprises small businesses , while TechAmerica and the Coalition for Government Procurement primarily comprise large firms. Our discussions with... procurement auctions . Lamm, D. V. (1987). Why firms refuse DOD business : an analysis of rationale. National Contract Management Journal , 21 (Winter
Steinberger, Dina M; Douglas, Stephen V; Kirschbaum, Mark S
2009-09-01
A multidisciplinary team from the University of Wisconsin Hospital and Clinics transplant program used failure mode and effects analysis to proactively examine opportunities for communication and handoff failures across the continuum of care from organ procurement to transplantation. The team performed a modified failure mode and effects analysis that isolated the multiple linked, serial, and complex information exchanges occurring during the transplantation of one solid organ. Failure mode and effects analysis proved effective for engaging a diverse group of persons who had an investment in the outcome in analysis and discussion of opportunities to improve the system's resilience for avoiding errors during a time-pressured and complex process.
EDOS operations concept and development approach
NASA Technical Reports Server (NTRS)
Knoble, G.; Garman, C.; Alcott, G.; Ramchandani, C.; Silvers, J.
1994-01-01
The Earth Observing System (EOS) Data and Operations System (EDOS) is being developed by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) for the capture, level zero processing, distribution, and backup archiving of high speed telemetry data received from EOS spacecraft. All data received will conform to the Consultative Committee for Space Data Standards (CCSDS) recommendations. The major EDOS goals are to: (1) minimize EOS program costs to implement and operate EDOS; (2) respond effectively to EOS growth requirements; and (3) maintain compatibility with existing and enhanced versions of NASA institutional systems required to support EOS spacecraft. In order to meet these goals, the following objectives have been defined for EDOS: (1) standardize EDOS interfaces to maximize utility for future requirements; (2) emphasize life-cycle cost (LCC) considerations (rather than procurement costs) in making design decisions and meeting reliability, maintainability, availability (RMA) and upgradability requirements; (3) implement data-driven operations to the maximum extent possible to minimize staffing requirements and to maximize system responsiveness; (4) provide a system capable of simultaneously supporting multiple spacecraft, each in different phases of their life-cycles; (5) provide for technology insertion features to accommodate growth and future LCC reductions during the operations phase; and (6) provide a system that is sufficiently robust to accommodate incremental performance upgrades while supporting operations. Operations concept working group meetings were facilitated to help develop the EDOS operations concept. This provided a cohesive concept that met with approval of responsible personnel from the start. This approach not only speeded up the development process by reducing review cycles, it also provided a medium for generating good ideas that were immediately molded into feasible concepts. The operations concept was then used as a basis for the EDOS specification. When it was felt that concept elements did not support detailed requirements, the facilitator process was used to resolve discrepancies or to add new concept elements to support the specification. This method provided an ongoing revisal of the operations concept and prevented large revisions at the end of the requirement analysis phase of system development.
A methodology for spacecraft technology insertion analysis balancing benefit, cost, and risk
NASA Astrophysics Data System (ADS)
Bearden, David Allen
Emerging technologies are changing the way space missions are developed and implemented. Technology development programs are proceeding with the goal of enhancing spacecraft performance and reducing mass and cost. However, it is often the case that technology insertion assessment activities, in the interest of maximizing performance and/or mass reduction, do not consider synergistic system-level effects. Furthermore, even though technical risks are often identified as a large cost and schedule driver, many design processes ignore effects of cost and schedule uncertainty. This research is based on the hypothesis that technology selection is a problem of balancing interrelated (and potentially competing) objectives. Current spacecraft technology selection approaches are summarized, and a Methodology for Evaluating and Ranking Insertion of Technology (MERIT) that expands on these practices to attack otherwise unsolved problems is demonstrated. MERIT combines the modern techniques of technology maturity measures, parametric models, genetic algorithms, and risk assessment (cost and schedule) in a unique manner to resolve very difficult issues including: user-generated uncertainty, relationships between cost/schedule and complexity, and technology "portfolio" management. While the methodology is sufficiently generic that it may in theory be applied to a number of technology insertion problems, this research focuses on application to the specific case of small (<500 kg) satellite design. Small satellite missions are of particular interest because they are often developed under rigid programmatic (cost and schedule) constraints and are motivated to introduce advanced technologies into the design. MERIT is demonstrated for programs procured under varying conditions and constraints such as stringent performance goals, not-to-exceed costs, or hard schedule requirements. MERIT'S contributions to the engineering community are its: unique coupling of the aspects of performance, cost, and schedule; assessment of system level impacts of technology insertion; procedures for estimating uncertainties (risks) associated with advanced technology; and application of heuristics to facilitate informed system-level technology utilization decisions earlier in the conceptual design phase. MERIT extends the state of the art in technology insertion assessment selection practice and, if adopted, may aid designers in determining the configuration of complex systems that meet essential requirements in a timely, cost-effective manner.
NASA Technical Reports Server (NTRS)
Hockensmith, R.; Devine, E.; Digiacomo, M.; Hager, F.; Moss, R.
1983-01-01
Satellites that use the NASA Tracking and Data Relay Satellite System (TDRSS) require antennas that are crucial for performing and achieving reliable TDRSS link performance at the desired data rate. Technical guidelines are presented to assist the prospective TDRSS medium-and high-data rate user in selecting and procuring a viable, steerable high-gain antenna system. Topics addressed include the antenna gain/transmitter power/data rate relationship; Earth power flux-density limitations; electromechanical requirements dictated by the small beam widths, desired angular coverage, and minimal torque disturbance to the spacecraft; weight and moment considerations; mechanical, electrical and thermal interfaces; design lifetime failure modes; and handling and storage. Proven designs are cited and space-qualified assemblies and components are identified.
Federal procurement of unlicensed medicines in Brazil; findings and implications.
Teodoro, Cristiane Roberta Dos Santos; Caetano, Rosângela; Godman, Brian; Dos Reis, André Luís Almeida; Maia, Aurélio de Araújo; Ramos, Mariana de Carvalho Barbosa; Osorio-de-Castro, Claudia Garcia Serpa
2017-12-01
There are safety concerns with using unlicensed medicines across countries including Brazil. Consequently this needs to be evaluated and concerns address if pertinent. Investigate such purchases by the Brazilian Federal Government from 2004 to 2013. Procurement data from a public-access databank that contains procurement information of the Brazilian Federal Government. Each procured item was cross-referenced to its active drug approval status in the Brazilian National Register (DOU). Exploratory analysis and trend measures were performed for the variables for mapping and characterizing the purchases of non-market approved drugs. 614 (0.14%) purchases in ten years corresponding to 64 unlicensed medicines - some of which had orphan drug status - and 48 different active substances; with a growing trend in recent years. Medicines in 51% of purchases were procured before obtaining marketing approval - with eventual refusals occurring in 17.8% and cancellation due to lack of efficacy and/or safety concerns in 1.1%. Health litigation accounted for 81.9% of purchases and growing in recent years. Overall a low rate of unlicensed medicine use. However there are concerns given the current regulations in Brazil and the recent increase in the use of unlicensed medicines with increased litigation.
An Analysis of Internal Controls and Procurement Fraud Deterrence
2013-12-01
might keep the organization from achieving its objectives and analyze risks , including fraud risk , so as to decide how the risk should be managed ( COSO ...internal control to adequately manage the risk ( COSO , 2013). Risk management involves developing the effective internal control targeted at a...structure and management . While the risk of fraud cannot be eliminated entirely, it can be greatly reduced with an appropriate procurement fraud prevention
CPTAC Biospecimen Collection Solicitation | Office of Cancer Clinical Proteomics Research
A funding opportunity in support of the National Cancer Institute’s Clinical Proteomic Tumor Analysis Consortium (CPTAC) seeks to prospectively procure tumor samples, collected for proteomics investigation. The scope of work under this Statement of Work encompasses the activities needed to prospectively procure high quality, clinically annotated human tumor samples, blood and plasma, and when feasible, normal tissue from volunteer patients suffering from colon, ovarian, and breast cancer.
Finding the Balance of Autonomy on-Board Versus Man-Triggered Actions from Ground
NASA Astrophysics Data System (ADS)
Lundin, Stefan
Odin is a scientific, 3-axis stabilised, fine-pointing, small satellite with a sensitive payload that provides high quality spectroscopy data in the optical, mm and submm regions. End-users are atmosphere scientists as well as astronomers in Canada, France, Finland and Sweden. The satellite was successfully injected into orbit in February 2001 by a START-1 rocket. Designed, developed and procured by the Swedish Space Corporation, Odin is now operated by our company ten times per day from its dedicated control centre located at Esrange in the northern Sweden. The usage of the same organisation gave us the possibility to find an efficient trade-off between "degree of autonomy on-board" versus "future operational cost".. The necessity of sophisticated, hard-to-develop autonomy was judged against mission objectives, spacecraft safety and additional operational cost. In the paper, the operational philosophy of Odin is presented and based on gathered experience in-orbit, the most essential autonomous functions on-board are identified. Odin is a low cost satellite with very high performance. For comparison, it is capable of unique science with a pointing accuracy better than 15 arcseconds. The procurement and launch of the satellite ended up to a total cost of 45 MUSD using a tight project team of only ten persons truly responsible for their subsystems. The same amount of people now operates the satellite and staffs the Mission Control Centre.
Anema, Aranka; Fielden, Sarah J.; Shurgold, Susan; Ding, Erin; Messina, Jennifer; Jones, Jennifer E.; Chittock, Brian; Monteith, Ken; Globerman, Jason; Rourke, Sean B.; Hogg, Robert S.
2016-01-01
Objective People living with HIV in high-resource settings suffer severe levels of food insecurity; however, limited evidence exists regarding dietary intake and sub-components that characterize food insecurity (i.e. food quantity, quality, safety or procurement) in this population. We examined the prevalence and characteristics of food insecurity among people living with HIV across British Columbia, Canada. Design This cross-sectional analysis was conducted within a national community-based research initiative. Methods Food security was measured using the Health Canada Household Food Security Scale Module. Logistic regression was used to determine key independent predictors of food insecurity, controlling for potential confounders. Results Of 262 participants, 192 (73%) reported food insecurity. Sub-components associated with food insecurity in bivariate analysis included: < RDI consumption of protein (p = 0.046); being sick from spoiled/unsafe food in the past six months (p = 0.010); and procurement of food using non-traditional methods (p <0.05). In multivariable analyses, factors significantly associated with food insecurity included: procurement of food using non-traditional methods [AOR = 11.11, 95% CI: 4.79–25.68, p = <0.001]; younger age [AOR = 0.92, 95% CI: 0.86–0.96, p = <0.001]; unstable housing [AOR = 4.46, 95% CI: 1.15–17.36, p = 0.031]; household gross annual income [AOR = 4.49, 95% CI: 1.74–11.60, p = 0.002]; and symptoms of depression [AOR = 2.73, 95% CI: 1.25–5.96, p = 0.012]. Conclusions Food insecurity among people living with HIV in British Columbia is characterized by poor dietary quality and food procurement methods. Notably, participants who reported procuring in non-traditional manners were over 10 times more likely to be food insecure. These findings suggest a need for tailored food security and social support interventions in this setting. PMID:27487041
Accommodating electric propulsion on SMART-1
NASA Astrophysics Data System (ADS)
Kugelberg, Joakim; Bodin, Per; Persson, Staffan; Rathsman, Peter
2004-07-01
This paper focuses on the technical challenges that arise when electric propulsion is used on a small spacecraft such as SMART-1. The choice of electric propulsion influences not only the attitude control system and the power system, but also the thermal control as well as the spacecraft structure. A description is given on how the design of the attitude control system uses the possibility to control the alignment of the thrust vector in order to reduce the momentum build-up. An outline is made of the philosophy of power generation and distribution and shows how the thermal interfaces to highly dissipating units have been solved. Areas unique for electric propulsion are the added value of a thrust vector orientation mechanism and the special consideration given to the electromagnetic compatibility. SMART-1 is equipped with a thruster gimbal mechanism providing a 10° cone in which the thrust vector can be pointed. Concerning the electromagnetic compatibility, a discussion on how to evaluate the available test results is given keeping in mind that one of the main objectives of the SMART-1 mission is to assess the impact of electric propulsion on the scientific instruments and on other spacecraft systems. Finally, the assembly, integration and test of the spacecraft is described. Compared to traditional propulsion systems, electric propulsion puts different requirements on the integration sequence and limits the possibilities to verify the correct function of the thruster since it needs high quality vacuum in order to operate. Prime contractor for SMART-1 is the Swedish Space Corporation (SSC). The electric propulsion subsystem is procured directly by ESA from SNECMA, France and is delivered to SSC as a customer furnished item. The conclusion of this paper is that electric propulsion is possible on a small spacecraft, which opens up possibilities for a new range of missions for which a large velocity increment is needed. The paper will also present SMART-1 and show how the problems related to the accommodation of electric propulsion have been solved during design and planning of the project.
NASA Technical Reports Server (NTRS)
Trubert, M.; Salama, M.
1979-01-01
Unlike an earlier shock spectra approach, generalization permits an accurate elastic interaction between the spacecraft and launch vehicle to obtain accurate bounds on the spacecraft response and structural loads. In addition, the modal response from a previous launch vehicle transient analysis with or without a dummy spacecraft - is exploited to define a modal impulse as a simple idealization of the actual forcing function. The idealized modal forcing function is then used to derive explicit expressions for an estimate of the bound on the spacecraft structural response and forces. Greater accuracy is achieved with the present method over the earlier shock spectra, while saving much computational effort over the transient analysis.
1981-03-12
Procurement Work Directive ( PWV ) Procurement Army, CostL to Procure Cost Differential Secondary (PAS) Cost to Buy Economic Order Quantity Procurement...and Assignment of Buyer h. Solicitation Fffort . ) (1) Procurement Planning ( ) ( ) (?) PWV Review and Small Business Coordination ( (3) Determination
A Study on Strategic Planning and Procurement of Medicals in Uganda’s Regional Referral Hospitals
2016-01-01
This study was an analysis of the effect of strategic planning on procurement of medicals in Uganda’s regional referral hospitals (RRH’s). Medicals were defined as essential medicines, medical devices and medical equipment. The Ministry of Health (MOH) has been carrying out strategic planning for the last 15 years via the Health Sector Strategic Plans. Their assumption was that strategic planning would translate to strategic procurement and consequently, availability of medicals in the RRH’s. However, despite the existence of these plans, there have been many complaints about expired drugs and shortages in RRH’s. For this purpose, a third variable was important because it served the role of mediation. A questionnaire was used to obtain information on perceptions of 206 respondents who were selected using simple random sampling. 8 key informant interviews were held, 2 in each RRH. 4 Focus Group Discussions were held, 1 for each RRH, and between 5 and 8 staff took part as discussants for approximately three hours. The findings suggested that strategic planning was affected by funding to approximately 34% while the relationship between funding and procurement was 35%. The direct relationship between strategic planning and procurement was 18%. However when the total causal effect was computed it turned out that strategic planning and the related variable of funding contributed 77% to procurement of medicals under the current hierarchical model where MOH is charged with development of strategic plans for the entire health sector. Since even with this contribution there were complaints, the study proposed a new model called CALF which according to a simulation, if adopted by MOH, strategic planning would contribute 87% to effectiveness in procurement of medicals. PMID:28299158
Cohen, Justin M; Singh, Inder; O'Brien, Megan E
2008-01-01
Background An accurate forecast of global demand is essential to stabilize the market for artemisinin-based combination therapy (ACT) and to ensure access to high-quality, life-saving medications at the lowest sustainable prices by avoiding underproduction and excessive overproduction, each of which can have negative consequences for the availability of affordable drugs. A robust forecast requires an understanding of the resources available to support procurement of these relatively expensive antimalarials, in particular from the Global Fund, at present the single largest source of ACT funding. Methods Predictive regression models estimating the timing and rate of disbursements from the Global Fund to recipient countries for each malaria grant were derived using a repeated split-sample procedure intended to avoid over-fitting. Predictions were compared against actual disbursements in a group of validation grants, and forecasts of ACT procurement extrapolated from disbursement predictions were evaluated against actual procurement in two sub-Saharan countries. Results Quarterly forecasts were correlated highly with actual smoothed disbursement rates (r = 0.987, p < 0.0001). Additionally, predicted ACT procurement, extrapolated from forecasted disbursements, was correlated strongly with actual ACT procurement supported by two grants from the Global Fund's first (r = 0.945, p < 0.0001) and fourth (r = 0.938, p < 0.0001) funding rounds. Conclusion This analysis derived predictive regression models that successfully forecasted disbursement patterning for individual Global Fund malaria grants. These results indicate the utility of this approach for demand forecasting of ACT and, potentially, for other commodities procured using funding from the Global Fund. Further validation using data from other countries in different regions and environments will be necessary to confirm its generalizability. PMID:18831742
Ajayi, Saheed O; Oyedele, Lukumon O
2018-05-01
Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.
Reforming antiretroviral price negotiations and public procurement: the Mexican experience.
Adesina, Adebiyi; Wirtz, Veronika J; Dratler, Sandra
2013-01-01
Since antiretroviral (ARV) medicines represent one of the most costly components of therapy for HIV in middle-income countries, ensuring their efficient procurement is highly relevant. In 2008, Mexico created a national commission for the negotiation of ARV prices to achieve price reductions for their public HIV treatment programmes. The objective of this study is to assess the immediate impact of the creation of the Mexican Commission for Price Negotiation on ARV prices and expenditures. A longitudinal retrospective analysis of procurement prices, volumes and type of the most commonly prescribed ARVs procured by the two largest providers of HIV/AIDS care in Mexico between 2004 and 2009 was carried out. These analyses were combined with 26 semi-structured key informant interviews to identify changes in the procurement process. Prices for ARVs dropped by an average of 38% after the first round of negotiations, indicating that the Commission was successful in price negotiations. However, when compared with other upper-middle-income countries, Mexico continues to pay an average of six times more for ARVs. The Commission's negotiations were successful in achieving lower ARV prices. However, price reduction in upper-middle-income countries suggests that the price decrease in Mexico cannot be entirely attributed to the Commission's first round of negotiations. In addition, key informants identified inefficiencies in the forecasting and procurement processes possibly affecting the efficiency of the negotiation process. A comprehensive approach to improving efficiency in the purchasing and delivery of ARVs is necessary, including a better clarification in the roles and responsibilities of the Commission, improving supply data collection and integration in forecasting and procurement, and the creation of a support system to monitor and provide feedback on patient ARV use.
A Study on Strategic Planning and Procurement of Medicals in Uganda's Regional Referral Hospitals.
Masembe, Ishak Kamaradi
2016-12-31
This study was an analysis of the effect of strategic planning on procurement of medicals in Uganda's regional referral hospitals (RRH's). Medicals were defined as essential medicines, medical devices and medical equipment. The Ministry of Health (MOH) has been carrying out strategic planning for the last 15 years via the Health Sector Strategic Plans. Their assumption was that strategic planning would translate to strategic procurement and consequently, availability of medicals in the RRH's. However, despite the existence of these plans, there have been many complaints about expired drugs and shortages in RRH's. For this purpose, a third variable was important because it served the role of mediation. A questionnaire was used to obtain information on perceptions of 206 respondents who were selected using simple random sampling. 8 key informant interviews were held, 2 in each RRH. 4 Focus Group Discussions were held, 1 for each RRH, and between 5 and 8 staff took part as discussants for approximately three hours. The findings suggested that strategic planning was affected by funding to approximately 34% while the relationship between funding and procurement was 35%. The direct relationship between strategic planning and procurement was 18%. However when the total causal effect was computed it turned out that strategic planning and the related variable of funding contributed 77% to procurement of medicals under the current hierarchical model where MOH is charged with development of strategic plans for the entire health sector. Since even with this contribution there were complaints, the study proposed a new model called CALF which according to a simulation, if adopted by MOH, strategic planning would contribute 87% to effectiveness in procurement of medicals.
Time Frequency Analysis of Spacecraft Propellant Tank Spinning Slosh
NASA Technical Reports Server (NTRS)
Green, Steven T.; Burkey, Russell C.; Sudermann, James
2010-01-01
Many spacecraft are designed to spin about an axis along the flight path as a means of stabilizing the attitude of the spacecraft via gyroscopic stiffness. Because of the assembly requirements of the spacecraft and the launch vehicle, these spacecraft often spin about an axis corresponding to a minor moment of inertia. In such a case, any perturbation of the spin axis will cause sloshing motions in the liquid propellant tanks that will eventually dissipate enough kinetic energy to cause the spin axis nutation (wobble) to grow further. This spinning slosh and resultant nutation growth is a primary design problem of spinning spacecraft and one that is not easily solved by analysis or simulation only. Testing remains the surest way to address spacecraft nutation growth. This paper describes a test method and data analysis technique that reveal the resonant frequency and damping behavior of liquid motions in a spinning tank. Slosh resonant frequency and damping characteristics are necessary inputs to any accurate numerical dynamic simulation of the spacecraft.
Carter, Timothy; Bodzin, Adam S; Hirose, Hitoshi; West, Sharon; Hasz, Richard; Maley, Warren R; Cavarocchi, Nicholas C
2014-07-01
Extracorporeal membrane oxygenation has become rescue therapy for adults with overwhelming cardiac and/or respiratory failure. Not all patients are saved, creating a new cohort of potential organ donors. This study examines the outcomes of liver and kidney allografts procured from donors on extracorporeal membrane oxygenation (ECMO). A retrospective review was conducted through the local organ procurement organization. Donors on ECMO prior to notification were classified into donation after brain death (DBD) and donation after cardiac death (DCD). We compared short-term outcome data against published standards. Between 1995 and 2012, 97 organs were procured from 41 donors supported on ECMO. There were 68 kidneys donated, 51 were transplanted and 17 discarded. Excluding extended criteria donors, 29 DBD and 13 DCD kidneys were transplanted from donors supported on ECMO. Delayed graft function occurred in 34% of DBD kidneys and 38% of DCD kidneys. Kidney allograft survival at one yr was 93%. Twenty-four livers were procured, nine discarded, and 15 transplanted. Ninety-three percent of liver transplant recipients were alive with graft function at one yr. Donation after brain death kidneys procured from donors on ECMO perform similarly to non-ECMO organs with regard to delayed graft function (DGF), one-yr graft survival and function. Livers from ECMO donors have a higher discard rate than non-ECMO donors, but function similarly at six months and one yr. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
A unified approach to computer analysis and modeling of spacecraft environmental interactions
NASA Technical Reports Server (NTRS)
Katz, I.; Mandell, M. J.; Cassidy, J. J.
1986-01-01
A new, coordinated, unified approach to the development of spacecraft plasma interaction models is proposed. The objective is to eliminate the unnecessary duplicative work in order to allow researchers to concentrate on the scientific aspects. By streamlining the developmental process, the interchange between theories and experimentalists is enhanced, and the transfer of technology to the spacecraft engineering community is faster. This approach is called the UNIfied Spacecraft Interaction Model (UNISIM). UNISIM is a coordinated system of software, hardware, and specifications. It is a tool for modeling and analyzing spacecraft interactions. It will be used to design experiments, to interpret results of experiments, and to aid in future spacecraft design. It breaks a Spacecraft Ineraction analysis into several modules. Each module will perform an analysis for some physical process, using phenomenology and algorithms which are well documented and have been subject to review. This system and its characteristics are discussed.
Liver Procurement for Orthotopic Transplantation: An Analysis of the Pittsburgh Experience
Van Thiel, David H.; Schade, Robert R.; Hakala, Thomas R.; Starzl, Thomas E.; Denny, Donald
2010-01-01
The incidence of prospective organ donors in the United States and the techniques which are to used to guarantee their optimal use after identification are analyzed. Attitudes of the public and health professionals toward organ donation are discussed. The organization of the Pittsburgh Organ Procurement Agency and its relationship to other such agencies is described. Finally, the presently used techniques of liver salvaging and preservation are outlined. PMID:6363261
2016-03-01
capabilities to cover the FMS supporting activities. 14. SUBJECT TERMS Republic of Turkey , Security Assistance, Foreign Military Sales, Direct...Agency IPO International Program Office JSUMMAT Joint United States Military Mission for Aid to Turkey LOA Letter of Acceptance LOAD Letter of...employment, capital formation, as well as research and development (Perfilio, 2007, p. 3). As a North Atlantic Treaty Organization (NATO) member, Turkey
Warranties in Weapon System Procurement: An Analysis of Practice and Theory.
1987-04-01
MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF SIANDARDS 1963 A fD r ILE GW cm AD-A190 933 IDA PAPER P-2024 WARRANTIES IN WEAPON SYSTEM PROCUREMENT...EPWT Essential Performance Warranty Test FAR Federal Acquisition Regulation GCS Guidance Control Section GLD Ground Laser Locator Designator GS General...Service IDA Institute for Defense Analyses I&L Installations and Logistics IPT Initial Production Test LDR Laser Designator Rangefimder MLDT Mean
NASA Technical Reports Server (NTRS)
Mantas, G. P.; Hanson, W. B.
1987-01-01
Approximate expressions for the electron current collected by a planar retarding potential analyzer (RPA) mounted on a moving, conducting, charged spacecraft are derived. They are utilized for the analysis of electron current data obtained by the RPAs on the Viking spacecraft in the ionosphere of Mars and in the disturbed and undisturbed solar wind near this planet. It is shown that contamination currents by photoelectrons emitted from the spacecraft can be distinguished and removed from the signal. Parameters deduced from the analysis of RPA electron sampling data are the multicomponent electron temperatures, the number densities, and the spacecraft potential.
Above the cloud computing orbital services distributed data model
NASA Astrophysics Data System (ADS)
Straub, Jeremy
2014-05-01
Technology miniaturization and system architecture advancements have created an opportunity to significantly lower the cost of many types of space missions by sharing capabilities between multiple spacecraft. Historically, most spacecraft have been atomic entities that (aside from their communications with and tasking by ground controllers) operate in isolation. Several notable example exist; however, these are purpose-designed systems that collaborate to perform a single goal. The above the cloud computing (ATCC) concept aims to create ad-hoc collaboration between service provider and consumer craft. Consumer craft can procure processing, data transmission, storage, imaging and other capabilities from provider craft. Because of onboard storage limitations, communications link capability limitations and limited windows of communication, data relevant to or required for various operations may span multiple craft. This paper presents a model for the identification, storage and accessing of this data. This model includes appropriate identification features for this highly distributed environment. It also deals with business model constraints such as data ownership, retention and the rights of the storing craft to access, resell, transmit or discard the data in its possession. The model ensures data integrity and confidentiality (to the extent applicable to a given data item), deals with unique constraints of the orbital environment and tags data with business model (contractual) obligation data.
Artificial intelligence for multi-mission planetary operations
NASA Technical Reports Server (NTRS)
Atkinson, David J.; Lawson, Denise L.; James, Mark L.
1990-01-01
A brief introduction is given to an automated system called the Spacecraft Health Automated Reasoning Prototype (SHARP). SHARP is designed to demonstrate automated health and status analysis for multi-mission spacecraft and ground data systems operations. The SHARP system combines conventional computer science methodologies with artificial intelligence techniques to produce an effective method for detecting and analyzing potential spacecraft and ground systems problems. The system performs real-time analysis of spacecraft and other related telemetry, and is also capable of examining data in historical context. Telecommunications link analysis of the Voyager II spacecraft is the initial focus for evaluation of the prototype in a real-time operations setting during the Voyager spacecraft encounter with Neptune in August, 1989. The preliminary results of the SHARP project and plans for future application of the technology are discussed.
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
20 CFR 435.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-04-01
... AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
Cost containment through pharmaceutical procurement: a Caribbean case study.
Huff-Rousselle, M; Burnett, F
1996-01-01
This article discusses the potential for health sector cost containment in developing countries through improved pharmaceutical procurement. By describing the specific example of the Eastern Caribbean Drug Service (ECDS), which provides a pooled procurement service to nine ministries of health in the small island nations of the Caribbean, it examines the elements of the procurement operation that allowed ECDS to reduce unit costs for pharmaceuticals by over 50 per cent during its first procurement cycle. The analysis of ECDS considers: (1) political will, institutional alliances, and the creation of a public sector monopsony; (2) pooling demand; (3) restricted international tendering and the pharmaceutical industry; (4) estimating demand and supplier guarantees; (5) reducing variety and increasing volume through standardizing pack sizes, dosage forms and strengths; (6) generic bidding and therapeutic alternative bidding; (7) mode of transport from foreign suppliers; (8) financing mechanisms, including choice of currency, foreign exchange, and terms of payment; (9) market conditions and crafting and enforcing supplier contracts; and, (10) the adjudication process, including consideration of suppliers' past performance, precision requirements in the manufacturing process, number of products awarded to suppliers, and issues of judgment. The authors consider the relevance of this agency's experience to other developing countries by providing a blueprint that can be adopted or modified to suit other situations.
Azzopardi-Muscat, Natasha; Schroder-Bäck, Peter; Brand, Helmut
2017-01-01
The Joint Procurement Agreement (JPA) is an innovative instrument for multi-country procurement of medical countermeasures against cross-border health threats. This paper aims to assess its potential performance. A literature review was conducted to identify key features of successful joint procurement programmes. Documentary analysis and a key informants' interview were carried out to analyse the European Union (EU) JPA. Ownership, equity, transparency, stable central financing, standardisation, flexibility and gradual development were identified as important prerequisites for successful establishment of multi-country joint procurement programmes in the literature while security of supply, favourable prices, reduction of operational costs and administrative burden and creation of professional expert networks were identified as desirable outcomes. The EU JPA appears to fulfil the criteria of ownership, transparency, equity, flexibility and gradual development. Standardisation is only partly fulfilled and central EU level financing is not provided. Security of supply is an important outcome for all EU Member States (MS). Price savings, reduction in administrative burden and creation of professional networks may be particularly attractive for the smaller MS. The JPA has the potential to increase health system collaboration and efficiency at EU level provided that the incentives for sustained commitment of larger MS are sufficiently attractive.
Annual Procurement Report, Fiscal Year 1997
NASA Technical Reports Server (NTRS)
1997-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1997. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during Fiscal Year 1997. However, these larger procurements accounted for only 43 percent of the total actions. Procurement action, as used in this report means contractual actions to obtain supplies, services or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or termination's to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract. The Annual Procurement Report is also available via the internet on the Procurement homepage.
78 FR 46239 - Designations of Chief Acquisition Officer and Senior Procurement Executive
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... Designations of Chief Acquisition Officer and Senior Procurement Executive and Delegation of Procurement... No. FR-5701-D-01] Designations of Chief Acquisition Officer and Senior Procurement Executive AGENCY... Procurement Officer as the Senior Procurement Executive. DATES: Effective Date: July 24, 2013. FOR FURTHER...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
48 CFR 752.225-71 - Local procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Local procurement. 752.225... Local procurement. For use in any USAID contract involving performance overseas. Local Procurement (FEB 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods...
Near-critical point phenomena in fluids (19-IML-1)
NASA Technical Reports Server (NTRS)
Beysens, D.
1992-01-01
Understanding the effects of gravity is essential if the behavior of fluids is to be predicted in spacecraft and orbital stations, and, more generally, to give a better understanding of the hydrodynamics in these systems. An understanding is sought of the behavior of fluids in space. What should emerge from the International Microgravity Lab (IML-1) mission is a better understanding of the kinetics of growth in off-critical conditions, in both liquid mixtures and pure fluids. This complex phenomenon is the object of intensive study in physics and materials sciences area. It is also expected that the IML-1 flight will procure key results to provide a better understanding of how a pure fluid can be homogenized without gravity induced convections, and to what extent the 'Piston Effect' is effective in thermalizing the compressible fluids.
Cost Analysis for Dual Source Weapon Procurement
1983-10-01
no change in the unit production cost of weapon systems. The theoretical foundation of a production rate impact on cost is closely related to - he...Yet the impact on procure- aent costs of these rate changes is not generally under- stood. Empirical studies in recent years have documented cases where...slbpe of th:. rate/cost curve.- Using this equation, Kratz, et al., reported the pric- reac- tions attributable to a change in production rate. Of th? 11
Procurement Fraud: A Knowledge-Level Analysis of Contracting Personnel
2014-12-01
experience, or how many years the paliicipant has been in the contracting career field. The scores ranged from 56.8 percent for patt icipants with 11 to 20...23. Percentage ofResponses to Internal Control Perception Question c. Procurement Fraud Scheme The survey patt icipants were asked to which...survey patt icipants’ average scores on the knowledge questions held a negative con elation with their yeru·s of experience, with the exception of
A Case Study Analysis of a System Acquisition by a Field Activity
1980-06-01
following personnel assisted in the preparation of this procurement plan: Mr. T. L. M. Wiegant Ms. J. Weaver Commander D. M. Chism Lieutenant Commander M...AUTHORITY (SSA). Rear Admiral V.T. EDSALL, SC, USN 2.2 PROCURING CONTRACTING OFFICER (PCO). Cofmander David M. CHISM , SC, USN (Regional Contracting...California, 1977. 5. Brozen, Dr. Yale, "Commentary," Barron’s National Business and Financial Weekly, 25 January 1971, p. 1. 6. Chism , CDR David, NISTARS
Dependence and power in healthcare equipment supply chains.
de Jong, Jurriaan L; Benton, W C
2018-03-05
Most healthcare organizations (HCOs) engage Group Purchasing Organizations (GPOs) as an outsourcing strategy to secure their supplies and materials. When an HCO outsources the procurement function to a GPO, this GPO will directly interact with the HCO's supplier on the HCO's behalf. This study investigates how an HCO's dependence on a GPO affects supply chain relationships and power in the healthcare medical equipment supply chain. Hypotheses are tested through factor analysis and structural equation modeling, using primary survey data from HCO procurement managers. An HCO's dependence on a GPO is found to be positively associated with a GPO's reliance on mediated power, but, surprisingly, negatively associated with a GPO's mediated power. Furthermore, analysis indicates that an HCO's dependence on a GPO is positively associated with an HCO's dependence on a GPO-contracted Original Equipment Manufacturer (OEM). HCO reliance on GPOs may lead to a buyer's dependence trap, where HCOs are increasingly dependent on GPOs and OEMs. Implications for HCO procurement managers and recommended steps for mitigation are offered. Power-dependence relationships in the medical equipment supply chain are not consistent with relationships in other, more traditional, supply chains. While dependence in a supply chain relationship typically leads to an increase in reliance on mediated power, GPO-dependent HCOs instead perceive a decrease in GPO mediated power. Furthermore, HCOs that rely on procurement service from GPOs are increasingly dependent on the OEMs.
Vilhelmsson, Andreas; Mulinari, Shai
2017-08-09
Little is known about how pharmaceutical companies lobby authorities or experts regarding procurement or the use of vaccines and antivirals. This paper investigates how members of Denmark's pandemic planning committee experienced lobbying efforts by Roche, manufacturer of Tamiflu, the antiviral that was stockpiled before the 2009 A(H1N1) pandemic. Analysis of interviews with six of seven members of the Danish core pandemic committee, supplemented with documentary analysis. We sought to identify (1) arguments and (2) tactics used in lobbying, and to characterize interviewees' views on the impact of (3) lobbying and (4) scientific evidence on the decision to stockpile Tamiflu. Roche lobbied directly (in its own name) and through a seemingly independent third party. Roche used two arguments: (1) the procurement agreement had to be signed quickly because the drug would be delivered on a first-come, first-served basis and (2) Denmark was especially vulnerable to an influenza crisis because it had smaller Tamiflu stocks than other countries. Most interviewees suspected that lobbying had an impact on Tamiflu procurement. Our study highlights risks posed by pharmaceutical lobbying. Arguments and tactics deployed by Roche are likely to be repeated whenever many countries are negotiating drug procurements in a monopolistic market. © The Author 2017. Published by Oxford University Press on behalf of Faculty of Public Health.
2 CFR 215.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
10 CFR 600.145 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
2 CFR 215.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
10 CFR 600.145 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
10 CFR 600.145 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Requirements for Grants and Cooperative Agreements With Institutions of Higher Education, Hospitals, and Other... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
15 CFR 14.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND... every procurement action. Price analysis may be accomplished in various ways, including the comparison...
2 CFR 215.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS (OMB CIRCULAR... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT... procurement action. Price analysis may be accomplished in various ways, including the comparison of price...
Cost analysis of Navy acquisition alternatives for the NAVSTAR Global Positioning System
NASA Astrophysics Data System (ADS)
Darcy, T. F.; Smith, G. P.
1982-12-01
This research analyzes the life cycle cost (LCC) of the Navy's current and two hypothetical procurement alternatives for NAVSTAR Global Positioning System (GPS) user equipment. Costs are derived by the ARINC Research Corporation ACBEN cost estimating system. Data presentation is in a comparative format describing individual alternative LCC and differential costs between alternatives. Sensitivity analysis explores the impact receiver-processor unit (RPU) first unit production cost has on individual alternative LCC, as well as cost differentials between each alternative. Several benefits are discussed that might provide sufficient cost savings and/or system effectiveness improvements to warrant a procurement strategy other than the existing proposal.
Summary of EOS flight dynamics analysis
NASA Technical Reports Server (NTRS)
Newman, Lauri Kraft; Folta, David C.
1995-01-01
From a flight dynamics perspective, the Earth Observing System (EOS) spacecraft present a number of challenges to mission designers. The Flight Dynamics Support Branch of NASA GSFC has examined a number of these challenges, including managing the EOS constellation, disposing of the spacecraft at the end-of-life (EOL), and achieving the appropriate mission orbit given launch vehicle and ascent propulsion constraints. The EOS program consists of a number of spacecraft including EOS-AM, an ascending node spacecraft, EOS-PM, a descending node spacecraft, the EOS Chemistry mission (EOS-CHEM), the EOS Altimetry Laser (EOS-LALT), and the EOS-Altimetry Radar (EOS-RALT). The orbit characteristics of these missions are presented. In order to assure that downlinking data from each spacecraft will be possible without interference between any two spacecraft, a careful examination of the relationships between spacecraft and how to maintain the spacecraft in a configuration which would minimize these communications problems must be made. The FDSB has performed various analyses to determine whether the spacecraft will be in a position to interfere with each other, how the orbit dynamics will change the relative positioning of the spacecraft over their lifetimes, and how maintenance maneuvers could be performed, if needed, to minimize communications problems. Prompted by an activity at NASA HQ to set guidelines for spacecraft regarding their end-of-life dispositions, much analysis has also been performed to determine the spacecraft lifetime of EOS-AM1 under various conditions, and to make suggestions regarding the spacecraft disposal. In performing this analysis, some general trends have been observed in lifetime calculations. The paper will present the EOS-AM1 lifetime results, comment on general reentry conclusions, and discuss how these analyses reflect on the HQ NMI. Placing the EOS spacecraft into their respective mission orbits involves some intricate maneuver planning to assure that all mission orbit requirements are met, given the initial conditions supplied by the launch vehicle at injection. The FDSB has developed an ascent scenario to meet the mission requirements. This paper presents results of the ascent analysis.
Shugalev, N P
1983-01-01
A study was made of the functional significance of GABA-ergic structures of the substantia nigra (SN) and the caudate nucleus (CN) and their role in food-procuring behaviour of cats. Analysis was made of behavioral and EEG-effects of local GABA and the GABA antagonist, picrotoxin, microinjections into the studied brain structures. Stimulation of the GABA-ergic structures of the SN produced a sedative effect and depression of the cat food-procuring behaviour. Effects of stimulation of the CN GABA-ergic structures were to a great degree reverse. The conclusion has been made that GABA-ergic structures of the SN and the CN play different roles in controlling the CN inhibitory influence upon food-procuring behaviour.
Jallier, Vincent; Guyondet, Christophe; Provent, Adeline; Laillou, Arnaud; Soekirman; Moench-Pfanner, Regina
2013-06-01
Access to high-grade micronutrients is a recurring challenge that often threatens the long-term sustainability of food fortification programs. To assess the efficiency of the Global Alliance for Improved Nutrition (GAIN) Premix Facility in procuring quality, affordable vitamin A for fortification of edible oil in Indonesia. A global approach to procurement of standard items was used by combining volumes across various demand streams in order to reduce the total cost of acquisition through economies of scale. The GAIN Premix Facility undertook a detailed analysis of vitamin A requirements across its existing customer base, which served as a basis for developing a reliable demand forecast. A consolidated, competitive tender was launched that resulted in the setting up of a long-term commercial agreement with the selected supplier to lock in the most competitive price for a given period of time. The direct benefit to oil manufacturers of fortifying with vitamin A is that the cost of fortification went down significantly compared with prices they would have been offered had they ordered vitamin A individually. In Indonesia, this consolidated procurement approach has allowed a 14.5% decrease in the unit price of vitamin A. The GAIN Premix Facility demonstrated its effectiveness in acting as a global procurement platform by aggregating demand across different customers and leveraging improved prices through increased volumes. Building on the success of this effort, the GAIN Premix Facility is replicating this global approach for procurement of other standard items being procured across fortification programs worldwide.
Operational Analysis of Time-Optimal Maneuvering for Imaging Spacecraft
2013-03-01
imaging spacecraft. The analysis is facilitated through the use of AGI’s Systems Tool Kit ( STK ) software. An Analytic Hierarchy Process (AHP)-based...the Singapore-developed X-SAT imaging spacecraft. The analysis is facilitated through the use of AGI’s Systems Tool Kit ( STK ) software. An Analytic...89 B. FUTURE WORK................................................................................. 90 APPENDIX A. STK DATA AND BENEFIT
NASA procurement report, FY 1992
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during the first six months of Fiscal Year 1992. The dollar value on procurements over $25,000 amounted to 98 percent of the total dollar value of procurement actions completed during the first six months of Fiscal Year 1992. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplementary agreements, change orders, or terminations to a contract that change the total amount of funds obligated.
Sørensen, Nina N; Lassen, Anne D; Løje, Hanne; Tetens, Inge
2015-09-01
With political support from the Danish Organic Action Plan 2020, organic public procurement in Denmark is expected to increase. In order to evaluate changes in organic food procurement in Danish public kitchens, reliable methods are needed. The present study aimed to compare organic food procurement measurements by two methods and to collect and discuss baseline organic food procurement measurements from public kitchens participating in the Danish Organic Action Plan 2020. Comparison study measuring organic food procurement by applying two different methods, one based on the use of procurement invoices (the Organic Cuisine Label method) and the other on self-reported procurement (the Dogme method). Baseline organic food procurement status was based on organic food procurement measurements and background information from public kitchens. Public kitchens participating in the six organic food conversion projects funded by the Danish Organic Action Plan 2020 during 2012 and 2013. Twenty-six public kitchens (comparison study) and 345 public kitchens (baseline organic food procurement status). A high significant correlation coefficient was found between the two organic food procurement measurement methods (r=0·83, P<0·001) with measurements relevant for the baseline status. Mean baseline organic food procurement was found to be 24 % when including measurements from both methods. The results indicate that organic food procurement measurements by both methods were valid for the baseline status report of the Danish Organic Action Plan 2020. Baseline results in Danish public kitchens suggest there is room for more organic as well as sustainable public procurement in Denmark.
The Hera Saturn entry probe mission
NASA Astrophysics Data System (ADS)
Mousis, O.; Atkinson, D. H.; Spilker, T.; Venkatapathy, E.; Poncy, J.; Frampton, R.; Coustenis, A.; Reh, K.; Lebreton, J.-P.; Fletcher, L. N.; Hueso, R.; Amato, M. J.; Colaprete, A.; Ferri, F.; Stam, D.; Wurz, P.; Atreya, S.; Aslam, S.; Banfield, D. J.; Calcutt, S.; Fischer, G.; Holland, A.; Keller, C.; Kessler, E.; Leese, M.; Levacher, P.; Morse, A.; Muñoz, O.; Renard, J.-B.; Sheridan, S.; Schmider, F.-X.; Snik, F.; Waite, J. H.; Bird, M.; Cavalié, T.; Deleuil, M.; Fortney, J.; Gautier, D.; Guillot, T.; Lunine, J. I.; Marty, B.; Nixon, C.; Orton, G. S.; Sánchez-Lavega, A.
2016-10-01
The Hera Saturn entry probe mission is proposed as an M-class mission led by ESA with a contribution from NASA. It consists of one atmospheric probe to be sent into the atmosphere of Saturn, and a Carrier-Relay spacecraft. In this concept, the Hera probe is composed of ESA and NASA elements, and the Carrier-Relay Spacecraft is delivered by ESA. The probe is powered by batteries, and the Carrier-Relay Spacecraft is powered by solar panels and batteries. We anticipate two major subsystems to be supplied by the United States, either by direct procurement by ESA or by contribution from NASA: the solar electric power system (including solar arrays and the power management and distribution system), and the probe entry system (including the thermal protection shield and aeroshell). Hera is designed to perform in situ measurements of the chemical and isotopic compositions as well as the dynamics of Saturn's atmosphere using a single probe, with the goal of improving our understanding of the origin, formation, and evolution of Saturn, the giant planets and their satellite systems, with extrapolation to extrasolar planets. Hera's aim is to probe well into the cloud-forming region of the troposphere, below the region accessible to remote sensing, to the locations where certain cosmogenically abundant species are expected to be well mixed. By leading to an improved understanding of the processes by which giant planets formed, including the composition and properties of the local solar nebula at the time and location of giant planet formation, Hera will extend the legacy of the Galileo and Cassini missions by further addressing the creation, formation, and chemical, dynamical, and thermal evolution of the giant planets, the entire solar system including Earth and the other terrestrial planets, and formation of other planetary systems.
International overview of hospital procurement.
Ferrier, Maud; Lariviere, David; Laurent, Claire; Roque, Eric
2011-01-01
This article was written by four French hospital director students at the Ecole des Hautes Etudes en Santé Publique (EHESP-School of Public Health) from a study conducted jointly with students at the Grenoble School of Management to present an international overview of hospital procurement methods in ten countries. An analysis of these methods showed that there was a general trend towards group purchasing, with some common aims in terms of costs and performance and some differences in legislation (competition), size of the public sector and centralization or decentralization.
2016-06-01
several changes that may prove to be consequential. B. Funding Climates The amount appropriated to DoD each year for procurement over the period FY...important to realize that the turns in the funds appropriated for procurement are a lagging indicator of a change in budget climate . Funding and...each of the events identified to signal major and sustained changes in the defense funding climate , which in fact they did. Analysis of surrounding
Using SFOC to fly the Magellan Venus mapping mission
NASA Technical Reports Server (NTRS)
Bucher, Allen W.; Leonard, Robert E., Jr.; Short, Owen G.
1993-01-01
Traditionally, spacecraft flight operations at the Jet Propulsion Laboratory (JPL) have been performed by teams of spacecraft experts utilizing ground software designed specifically for the current mission. The Jet Propulsion Laboratory set out to reduce the cost of spacecraft mission operations by designing ground data processing software that could be used by multiple spacecraft missions, either sequentially or concurrently. The Space Flight Operations Center (SFOC) System was developed to provide the ground data system capabilities needed to monitor several spacecraft simultaneously and provide enough flexibility to meet the specific needs of individual projects. The Magellan Spacecraft Team utilizes the SFOC hardware and software designed for engineering telemetry analysis, both real-time and non-real-time. The flexibility of the SFOC System has allowed the spacecraft team to integrate their own tools with SFOC tools to perform the tasks required to operate a spacecraft mission. This paper describes how the Magellan Spacecraft Team is utilizing the SFOC System in conjunction with their own software tools to perform the required tasks of spacecraft event monitoring as well as engineering data analysis and trending.
NASA procurement report, FY 1993
NASA Technical Reports Server (NTRS)
1993-01-01
Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contract to the cost of an annual procurement approach, using a present value analysis. Do not award the multiyear contract unless the analysis shows that the multiyear contract will result in the lower cost (10 U...
A generalized modal shock spectra method for spacecraft loads analysis
NASA Technical Reports Server (NTRS)
Trubert, M.; Salama, M.
1979-01-01
Unlike the traditional shock spectra approach, the generalization presented in this paper permits elastic interaction between the spacecraft and launch vehicle in order to obtain accurate bounds on the spacecraft response and structural loads. In addition, the modal response from a previous launch vehicle transient analysis - with or without a dummy spacecraft - is exploited in order to define a modal impulse as a simple idealization of the actual forcing function. The idealized modal forcing function is then used to derive explicit expressions for an estimate of the bound on the spacecraft structural response and forces.
Application of Kanban System on a hospital pharmacy.
Mitka, Eleftheria
2015-01-01
This is a brief overview of principles, views and methods, of the Kanban System for the pharmacy of a general hospital. The main goal is the reduction of stores managed by the pharmacy, as well as improvement of the mode of operation. Solutions to problems, such as inadequate storage space, the delay in serving patients or clinics and the expiration of various pharmaceutical formulations, stored for so long time, are provided. The philosophy behind the Kanban procurement System and specifically its applicability to a pharmacy underperforming in terms of efficiency, in Greece, are described. Based on the analysis of stock requirement, item stock prices and demand, it is concluded that a significant percentage of the stocked drugs can be procured using the Kanban System. Significant cost savings and operational advantages following the Kanban System will take place. The challenging endeavor is the analysis, design and application of a system that supports the proposed procurement method. Hospital pharmacies in Greece and in other countries that face an economic crisis may largely benefit after using the Kanban System.
Systems design and analysis of the microwave radiometer spacecraft
NASA Technical Reports Server (NTRS)
Garrett, L. B.
1981-01-01
Systems design and analysis data were generated for microwave radiometer spacecraft concept using the Large Advanced Space Systems (LASS) computer aided design and analysis program. Parametric analyses were conducted for perturbations off the nominal-orbital-altitude/antenna-reflector-size and for control/propulsion system options. Optimized spacecraft mass, structural element design, and on-orbit loading data are presented. Propulsion and rigid-body control systems sensitivities to current and advanced technology are established. Spacecraft-induced and environmental effects on antenna performance (surface accuracy, defocus, and boresight off-set) are quantified and structured material frequencies and modal shapes are defined.
Wirtz, Veronika J; Santa-Ana-Tellez, Yared; Trout, Clinton H; Kaplan, Warren A
2012-12-01
Public sector price analyses of antiretroviral (ARV) medicines can provide relevant information to detect ARV procurement procedures that do not obtain competitive market prices. Price benchmarks provide a useful tool for programme managers and policy makers to support such planning and policy measures. The aim of the study was to develop regional and global price benchmarks which can be used to analyse public-sector price variability of ARVs in low- and middle-income countries using the procurement prices of Latin America and the Caribbean (LAC) countries in 2008 as an example. We used the Global Price Reporting Mechanism (GPRM) data base, provided by the World Health Organization (WHO), for 13 LAC countries' ARV procurements to analyse the procurement prices of four first-line and three second-line ARV combinations in 2008. First, a cross-sectional analysis was conducted to compare ARV combination prices. Second, four different price 'benchmarks' were created and we estimated the additional number of patients who could have been treated in each country if the ARV combinations studied were purchased at the various reference ('benchmark') prices. Large price variations exist for first- and second-line ARV combinations between countries in the LAC region. Most countries in the LAC region could be treating between 1.17 and 3.8 times more patients if procurement prices were closer to the lowest regional generic price. For all second-line combinations, a price closer to the lowest regional innovator prices or to the global median transaction price for lower-middle-income countries would also result in treating up to nearly five times more patients. Some rational allocation of financial resources due, in part, to price benchmarking and careful planning by policy makers and programme managers can assist a country in negotiating lower ARV procurement prices and should form part of a sustainable procurement policy.
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
40 CFR 35.6565 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated... negotiation. Contracting agencies shall use competitive negotiation for the procurement of engineering and...
22 CFR 201.23 - Procurement under private sector procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...
Summary data on all NASA procurement actions
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
Design and architecture of the Mars relay network planning and analysis framework
NASA Technical Reports Server (NTRS)
Cheung, K. M.; Lee, C. H.
2002-01-01
In this paper we describe the design and architecture of the Mars Network planning and analysis framework that supports generation and validation of efficient planning and scheduling strategy. The goals are to minimize the transmitting time, minimize the delaying time, and/or maximize the network throughputs. The proposed framework would require (1) a client-server architecture to support interactive, batch, WEB, and distributed analysis and planning applications for the relay network analysis scheme, (2) a high-fidelity modeling and simulation environment that expresses link capabilities between spacecraft to spacecraft and spacecraft to Earth stations as time-varying resources, and spacecraft activities, link priority, Solar System dynamic events, the laws of orbital mechanics, and other limiting factors as spacecraft power and thermal constraints, (3) an optimization methodology that casts the resource and constraint models into a standard linear and nonlinear constrained optimization problem that lends itself to commercial off-the-shelf (COTS)planning and scheduling algorithms.
75 FR 13262 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...: Additions to and deletions from the Procurement List. SUMMARY: This action adds to the Procurement List a... severe disabilities, and deletes from the Procurement List services previously furnished by such agencies... Severely Disabled published notices of proposed additions to the Procurement List. After consideration of...
75 FR 49481 - Procurement List; Additions and Deletion
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-13
... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...
Public perspectives on biospecimen procurement: what biorepositories should consider.
L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M
2013-06-01
Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.
NASA Technical Reports Server (NTRS)
Dec, John A.; Gasbarre, Joseph F.; George, Benjamin E.
2002-01-01
The Mars Odyssey spacecraft made use of multipass aerobraking to gradually reduce its orbit period from a highly elliptical insertion orbit to its final science orbit. Aerobraking operations provided an opportunity to apply advanced thermal analysis techniques to predict the temperature of the spacecraft's solar array for each drag pass. Odyssey telemetry data was used to correlate the thermal model. The thermal analysis was tightly coupled to the flight mechanics, aerodynamics, and atmospheric modeling efforts being performed during operations. Specifically, the thermal analysis predictions required a calculation of the spacecraft's velocity relative to the atmosphere, a prediction of the atmospheric density, and a prediction of the heat transfer coefficients due to aerodynamic heating. Temperature correlations were performed by comparing predicted temperatures of the thermocouples to the actual thermocouple readings from the spacecraft. Time histories of the spacecraft relative velocity, atmospheric density, and heat transfer coefficients, calculated using flight accelerometer and quaternion data, were used to calculate the aerodynamic heating. During aerobraking operations, the correlations were used to continually update the thermal model, thus increasing confidence in the predictions. This paper describes the thermal analysis that was performed and presents the correlations to the flight data.
Human factors in the Naval Air Systems Command: Computer based training
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seamster, T.L.; Snyder, C.E.; Terranova, M.
1988-01-01
Military standards applied to the private sector contracts have a substantial effect on the quality of Computer Based Training (CBT) systems procured for the Naval Air Systems Command. This study evaluated standards regulating the following areas in CBT development and procurement: interactive training systems, cognitive task analysis, and CBT hardware. The objective was to develop some high-level recommendations for evolving standards that will govern the next generation of CBT systems. One of the key recommendations is that there be an integration of the instructional systems development, the human factors engineering, and the software development standards. Recommendations were also made formore » task analysis and CBT hardware standards. (9 refs., 3 figs.)« less
NASA Technical Reports Server (NTRS)
Lawson, Denise L.; James, Mark L.
1989-01-01
The Spacecraft Health Automated Reasoning Prototype (SHARP) is a system designed to demonstrate automated health and status analysis for multi-mission spacecraft and ground data systems operations. Telecommunications link analysis of the Voyager 2 spacecraft is the initial focus for the SHARP system demonstration which will occur during Voyager's encounter with the planet Neptune in August, 1989, in parallel with real time Voyager operations. The SHARP system combines conventional computer science methodologies with artificial intelligence techniques to produce an effective method for detecting and analyzing potential spacecraft and ground systems problems. The system performs real time analysis of spacecraft and other related telemetry, and is also capable of examining data in historical context. A brief introduction is given to the spacecraft and ground systems monitoring process at the Jet Propulsion Laboratory. The current method of operation for monitoring the Voyager Telecommunications subsystem is described, and the difficulties associated with the existing technology are highlighted. The approach taken in the SHARP system to overcome the current limitations is also described, as well as both the conventional and artificial intelligence solutions developed in SHARP.
SHARP: A multi-mission AI system for spacecraft telemetry monitoring and diagnosis
NASA Technical Reports Server (NTRS)
Lawson, Denise L.; James, Mark L.
1989-01-01
The Spacecraft Health Automated Reasoning Prototype (SHARP) is a system designed to demonstrate automated health and status analysis for multi-mission spacecraft and ground data systems operations. Telecommunications link analysis of the Voyager II spacecraft is the initial focus for the SHARP system demonstration which will occur during Voyager's encounter with the planet Neptune in August, 1989, in parallel with real-time Voyager operations. The SHARP system combines conventional computer science methodologies with artificial intelligence techniques to produce an effective method for detecting and analyzing potential spacecraft and ground systems problems. The system performs real-time analysis of spacecraft and other related telemetry, and is also capable of examining data in historical context. A brief introduction is given to the spacecraft and ground systems monitoring process at the Jet Propulsion Laboratory. The current method of operation for monitoring the Voyager Telecommunications subsystem is described, and the difficulties associated with the existing technology are highlighted. The approach taken in the SHARP system to overcome the current limitations is also described, as well as both the conventional and artificial intelligence solutions developed in SHARP.
77 FR 11071 - Procurement List; Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies... People Who Are Blind or Severely Disabled published notices of proposed additions to the Procurement List...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
14 CFR 1201.400 - NASA procurement program.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false NASA procurement program. 1201.400 Section... AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
NASA Technical Reports Server (NTRS)
Bodley, C. S.; Devers, A. D.; Park, A. C.
1975-01-01
Analytical procedures and digital computer code are presented for the dynamic analysis of a flexible spacecraft with rotating components. Topics, considered include: (1) nonlinear response in the time domain, and (2) linear response in the frequency domain. The spacecraft is assumed to consist of an assembly of connected rigid or flexible subassemblies. The total system is not restricted to a topological connection arrangement and may be acting under the influence of passive or active control systems and external environments. The analytics and associated digital code provide the user with the capability to establish spacecraft system nonlinear total response for specified initial conditions, linear perturbation response about a calculated or specified nominal motion, general frequency response and graphical display, and spacecraft system stability analysis.
Statistical analysis of the Nb3Sn strand production for the ITER toroidal field coils
NASA Astrophysics Data System (ADS)
Vostner, A.; Jewell, M.; Pong, I.; Sullivan, N.; Devred, A.; Bessette, D.; Bevillard, G.; Mitchell, N.; Romano, G.; Zhou, C.
2017-04-01
The ITER toroidal field (TF) strand procurement initiated the largest Nb3Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. This paper presents the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked (‘verified’) by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. The results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb3Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.
Analysis of Opportunities for Intercalibration Between Two Spacecraft. Chapter 1
NASA Technical Reports Server (NTRS)
Roithmayr, Carlos M.; Speth, Paul W.
2012-01-01
There is currently a strong interest in obtaining highly accurate measurements of solar radiation reflected by Earth. For example, the Traceable Radiometry Underpinning Terrestrial- and Helio- Studies (TRUTHS) satellite mission has been under consideration in Europe for several years, and planning is now under way for the Climate Absolute Radiance and Refractivity Observatory (CLARREO) spacecraft in the United States. Such spacecraft will provide measurements whose high accuracy is traceable to SI standards; these measurements will be useful as a reference for calibrating similar instruments on board other spacecraft. Hence, analysis of opportunities for intercalibration between two spacecraft plays an important role in the planning of future missions. In order for intercalibration to take place, the measurements obtained from two spacecraft must have similar viewing geometry and be taken within a few minutes of one another. Viewing geometry is characterized in terms of viewing zenith angle, solar zenith angle, and relative azimuth angle. Opportunities for intercalibration are greater in number and longer in duration if the sensor with high accuracy can be aimed at points on the surface of the Earth other than the nadir or sub-satellite point. Analysis of intercalibration over long periods is rendered tractable by making several simplifying assumptions regarding orbital motions of the two spacecraft about Earth, as well as Earth s orbit about the Sun. The shape of the Earth is also considered. A geometric construction called a tent is introduced to facilitate analysis. It is helpful to think of an intercalibration opportunity as the passage of one spacecraft through a tent that has a fixed shape and moves with the spacecraft whose measurements are to be calibrated. Selection of points on Earth s surface as targets for measurement is discussed, as is aiming the boresight of a steerable instrument. Analysis results for a pair of spacecraft in typical low Earth orbits are provided.
Cresswell, Kathrin M; Lee, Lisa; Slee, Ann; Coleman, Jamie; Bates, David W; Sheikh, Aziz
2015-01-01
Objectives We studied vendor perspectives about potentially transferable lessons for implementing organisations and national strategies surrounding the procurement of Computerised Physician Order Entry (CPOE)/Clinical Decision Support (CDS) systems in English hospitals. Setting Data were collected from digitally audio-recorded discussions from a series of CPOE/CDS vendor round-table discussions held in September 2014 in the UK. Participants Nine participants, representing 6 key vendors operating in the UK, attended. The discussions were transcribed verbatim and thematically analysed. Results Vendors reported a range of challenges surrounding the procurement and contracting processes of CPOE/CDS systems, including hospitals’ inability to adequately assess their own needs and then select a suitable product, rushed procurement and implementation processes that resulted in difficulties in meaningfully engaging with vendors, as well as challenges relating to contracting leading to ambiguities in implementation roles. Consequently, relationships between system vendors and hospitals were often strained, the vendors attributing this to a lack of hospital management's appreciation of the complexities associated with implementation efforts. Future anticipated challenges included issues surrounding the standardisation of data to enable their aggregation across systems for effective secondary uses, and implementation of data exchange with providers outside the hospital. Conclusions Our results indicate that there are significant issues surrounding capacity to procure and optimise CPOE/CDS systems among UK hospitals. There is an urgent need to encourage more synergistic and collaborative working between providers and vendors and for a more centralised support for National Health Service hospitals, which draws on a wider body of experience, including a formalised procurement framework with value-based product specifications. PMID:26503385
75 FR 4784 - Procurement List; Addition
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... Procurement List. SUMMARY: This action adds to the Procurement List a service to be furnished by a nonprofit... Who Are Blind or Severely Disabled published a notice of proposed addition to the Procurement List... Committee has determined that the service listed below is suitable for procurement by the Federal Government...
14 CFR § 1201.400 - NASA procurement program.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NASA procurement program. § 1201.400... ORGANIZATION AND GENERAL INFORMATION General Information § 1201.400 NASA procurement program. (a) The Office of... contact for NASA procurements. Although the procurements may be made by the field installations, selected...
22 CFR 1006.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1006.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
21 CFR 1404.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 1404.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
34 CFR 85.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 1 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... DEBARMENT AND SUSPENSION (NONPROCUREMENT) Covered Transactions § 85.220 Are any procurement contracts... procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
Near Earth asteroid rendezvous
NASA Technical Reports Server (NTRS)
1992-01-01
The Spacecraft Design Course is the capstone design class for the M.S. in astronautics at the Naval Postgraduate School. The Fall 92 class designed a spacecraft for the Near Earth Asteroid Rendezvous Mission (NEAR). The NEAR mission uses a robotic spacecraft to conduct up-close reconnaissance of a near-earth asteroid. Such a mission will provide information on Solar System formation and possible space resources. The spacecraft is intended to complete a NEAR mission as a relatively low-budget program while striving to gather as much information about the target asteroid as possible. A complete mission analysis and detailed spacecraft design were completed. Mission analysis includes orbit comparison and selection, payload and telemetry requirements, spacecraft configuration, and launch vehicle selection. Spacecraft design includes all major subsystems: structure, electrical power, attitude control, propulsion, payload integration, and thermal control. The resulting spacecraft demonstrates the possibility to meet the NEAR mission requirements using existing technology, 'off-the-shelf' components, and a relatively low-cost launch vehicle.
Observations on Complexity and Costs for Over Three Decades of Communications Satellites
NASA Astrophysics Data System (ADS)
Bearden, David A.
2002-01-01
This paper takes an objective look at approximately thirty communications satellites built over three decades using a complexity index as an economic model. The complexity index is derived from a number of technical parameters including dry mass, end-of-life- power, payload type, communication bands, spacecraft lifetime, and attitude control approach. Complexity is then plotted versus total satellite cost and development time (defined as contract start to first launch). A comparison of the relative cost and development time for various classes of communications satellites and conclusions regarding dependence on system complexity are presented. Observations regarding inherent differences between commercially acquired systems and those procured by government organizations are also presented. A process is described where a new communications system in the formative stage may be compared against similarly "complex" missions of the recent past to balance risk within allotted time and funds. 1
Lockheed Martin Response to the OSP Challenge
NASA Technical Reports Server (NTRS)
Sullivan, Robert T.; Munkres, Randy; Megna, Thomas D.; Beckham, Joanne
2003-01-01
The Lockheed Martin Orbital Space Plane System provides crew transfer and rescue for the International Space Station more safely and affordably than current human space transportation systems. Through planned upgrades and spiral development, it is also capable of satisfying the Nation's evolving space transportation requirements and enabling the national vision for human space flight. The OSP System, formulated through rigorous requirements definition and decomposition, consists of spacecraft and launch vehicle flight elements, ground processing facilities and existing transportation, launch complex, range, mission control, weather, navigation, communication and tracking infrastructure. The concept of operations, including procurement, mission planning, launch preparation, launch and mission operations and vehicle maintenance, repair and turnaround, is structured to maximize flexibility and mission availability and minimize program life cycle cost. The approach to human rating and crew safety utilizes simplicity, performance margin, redundancy, abort modes and escape modes to mitigate credible hazards that cannot be designed out of the system.
Attitude propulsion technology for TOPS
NASA Technical Reports Server (NTRS)
Moynihan, P. I.
1972-01-01
The thermoelectric outer planet spacecraft (TOPS) attitude propulsion subsystem (APS) effort is discussed. It includes the tradeoff rationale that went into the selection of an anhydrous hydrazine baseline system, followed by a discussion of the 0.22 N thruster and its integration into a portable, self-contained propulsion module that was designed, developed, and man rated to support the TOPS single-axis attitude control tests. The results of a cold-start feasibility demonstration with a modified thruster are presented. A description of three types of 0.44 thrusters that were procured for in-house evaluation is included along with the results of the test program. This is followed by a description of the APS feed system components, their evaluations, and a discussion of an evaluation of elastomeric material for valve seat seals. A list of new technology items which will be of value for application to future systems of this type is included.
A study of structural concepts for ultralightweight spacecraft
NASA Technical Reports Server (NTRS)
Miller, R. K.; Knapp, K.; Hedgepeth, J. M.
1984-01-01
Structural concepts for ultralightweight spacecraft were studied. Concepts for ultralightweight space structures were identified and the validity of heir potential application in advanced spacecraft was assessed. The following topics were investigated: (1) membrane wrinkling under pretensioning; (2) load-carrying capability of pressurized tubes; (3) equilibrium of a precompressed rim; (4) design of an inflated reflector spacecraft; (5) general instability of a rim; and (6) structural analysis of a pressurized isotensoid column. The design approaches for a paraboloidal reflector spacecraft included a spin-stiffened design, both inflated and truss central columns, and to include both deep truss and rim-stiffened geodesic designs. The spinning spacecraft analysis is included, and the two truss designs are covered. The performances of four different approaches to the structural design of a paraboloidal reflector spacecraft are compared. The spinning and inflated configurations result in very low total masses and some concerns about their performance due to unresolved questions about dynamic stability and lifetimes, respectively.
Bahm, Sarah M; Karkazis, Katrina; Magnus, David
2013-09-01
To identify and analyze existing posthumous sperm procurement (PSP) protocols in order to outline central themes for institutions to consider when developing future policies. Qualitative content analysis. Large academic institutions across the United States. We performed a literature search and contacted 40 institutions to obtain nine full PSP protocols. We then performed a content analysis on these policies to identify major themes and factors to consider when developing a PSP protocol. Presence of a PSP policy. We identified six components of a thorough PSP protocol: Standard of Evidence, Terms of Eligibility, Sperm Designee, Restrictions on Use in Reproduction, Logistics, and Contraindications. We also identified two different approaches to policy structure. In the Limited Role approach, institutions have stricter consent requirements and limit their involvement to the time of procurement. In the Family-Centered approach, substituted judgment is permitted but a mandatory wait period is enforced before sperm use in reproduction. Institutions seeking to implement a PSP protocol will benefit from considering the six major building blocks of a thorough protocol and where they would like to fall on the spectrum from a Limited Role to a Family-Centered approach. Copyright © 2013 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.
Public Perspectives on Biospecimen Procurement: What Biorepositories Should Consider
L'Heureux, Jamie; Murray, Jeffrey C.; Newbury, Elizabeth; Shinkunas, Laura
2013-01-01
Purpose Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus “direct” procurement strategies such as the drawing of blood. Methods Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. Results The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Conclusion Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens. PMID:24850089
13 CFR 121.407 - What are the size procedures for multiple item procurements?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...
13 CFR 127.101 - What type of assistance is available under this part?
Code of Federal Regulations, 2011 CFR
2011-01-01
... ADMINISTRATION WOMEN-OWNED SMALL BUSINESS FEDERAL CONTRACT ASSISTANCE PROCEDURES (Eff. until 2-4-11) General... analysis (including analysis of its own procurement history), that the set-aside would meet all applicable...
Composite Bus Structure for the SMEX/WIRE Satellite
NASA Technical Reports Server (NTRS)
Rosanova, Giulio G.
1998-01-01
In an effort to reduce the weight and optimize the structural design of the Small Explorer (SMEX) Wide-Field Infrared Explorer (WIRE) spacecraft, it has become desirable to change the material and construction from mechanically fastened aluminum structure to a fully bonded fiber-reinforced composite (FRC) structure. GSFC has developed the WIRE spacecraft structural bus design concept, including the instrument and launch vehicle requirements. The WIRE Satellite is the fifth of a series of SMEX satellites to be launched once per year. GSFC has chosen Composite Optics Inc. (COI) as the prime contractor for the development and procurement of the WIRE composite structure. The detailed design of the fully bonded FRC structure is based on COI's Short Notice Accelerated Production SATellite ("SNAPSAT") approach. SNAPSAT is a state of the art design and manufacturing technology for advanced composite materials which utilizes flat-stock detail parts bonded together to produce a final structural assembly. The structural design approach adopted for the WIRE structure provides a very viable alternative to both traditional aluminum construction as well as high tech. molded type composite structures. This approach to composite structure design is much less costly than molded or honeycomb sandwich type composite construction, but may cost slightly more than conventional aluminum construction on the subsystem level. However on the overall program level the weight saving achieved is very cost effective, since the primary objective is to allocate more mass for science payloads.
Baughn, Daniel; Auerbach, Stephen M; Siminoff, Laura A
2010-09-01
Interpersonal relations with health care providers influence families' decisions to consent to solid-organ donation. However, previous research has been based on retrospective interviews with donation-eligible families and has not directly examined the interpersonal interactions between families and organ procurement coordinators. To increase understanding of the interpersonal interaction between procurement coordinators and families during the organ donation discussion, with special attention to the influence of the sex and race of the procurement coordinator and the race of the potential donor's family. A descriptive study in which standardized patients portrayed family members interacting with actual procurement coordinators in simulated donation request scenarios. Thirty-three videotaped interactions between standardized patients and 17 procurement coordinators involving 2 different scenarios depicting deceased donation were evaluated. Video recordings were rated by independent coders. Coders completed the Impact Message Inventory-Form C, the Participatory Style of Physician Scale, and the Siminoff Communication and Content and Affect Program-Global Observer Ratings scale. African American procurement coordinators, particularly African American women, were rated as more controlling and work-oriented than white procurement coordinators. Male procurement coordinators were more affiliative with the white family than the African American family, whereas female procurement coordinators were slightly less affiliative with the white family. African American procurement coordinators expressed more positive affect when interacting with the African American family than the white family, whereas the opposite was true for white procurement coordinators. Research is needed to cross-validate these exploratory findings and further examine cultural mistrust between procurement coordinators and families of ethnic minorities, especially given the negative attitudes of many minorities toward donation.
7 CFR 550.47 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 6 2010-01-01 2010-01-01 false Cost and price analysis. 550.47 Section 550.47... OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements Procurement Standards § 550.47 Cost and price analysis. Some form of cost or price analysis shall...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... analysis provides information on specific service contract actions that were analyzed as part of the FY... analysis at the following link: http://www.usitc.gov/procurement/ . FOR FURTHER INFORMATION CONTACT... INTERNATIONAL TRADE COMMISSION Public Availability of FY 2011 Service Contract Inventory Analysis...
Acquisition-Management Program
NASA Technical Reports Server (NTRS)
Avery, Don E.; Vann, A. Vernon; Jones, Richard H.; Rew, William E.
1987-01-01
NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.
NASA Technical Reports Server (NTRS)
Zheng, Yihua; Kuznetsova, Maria M.; Pulkkinen, Antti A.; Maddox, Marlo M.; Mays, Mona Leila
2015-01-01
The Space Weather Research Center (http://swrc. gsfc.nasa.gov) at NASA Goddard, part of the Community Coordinated Modeling Center (http://ccmc.gsfc.nasa.gov), is committed to providing research-based forecasts and notifications to address NASA's space weather needs, in addition to its critical role in space weather education. It provides a host of services including spacecraft anomaly resolution, historical impact analysis, real-time monitoring and forecasting, tailored space weather alerts and products, and weekly summaries and reports. In this paper, we focus on how (near) real-time data (both in space and on ground), in combination with modeling capabilities and an innovative dissemination system called the integrated Space Weather Analysis system (http://iswa.gsfc.nasa.gov), enable monitoring, analyzing, and predicting the spacecraft charging environment for spacecraft users. Relevant tools and resources are discussed.
Routine recovery: an ethical plan for greatly increasing the supply of transplantable organs.
Spital, Aaron; Taylor, James S
2008-04-01
All current organ procurement policies require some form of consent. Many families refuse to permit organ recovery from a recently deceased relative; therefore, the major cost of requiring consent is the loss of some lives that could have been saved through transplantation. Here, we argue for a much more efficient approach to organ procurement from brain dead individuals - routine recovery of all transplantable organs without consent. Careful analysis of the relevant literature shows that, compared with its competitors, routine recovery has the greatest potential to increase cadaveric organ procurement and save lives while causing very little harm. Furthermore, a recent survey suggests that 30% of the US public would already accept routine recovery even though the respondents were not educated regarding the value of this approach. Patients on the transplant waiting list are dying while organs that could have saved them are being buried or burned because of family refusal to allow posthumous organ procurement. Routine recovery would eliminate this tragic loss of life-saving organs without violating ethical principles. Indeed, we argue that of all the proposals designed to increase the supply of transplantable cadaveric organs, routine recovery is the best.
41 CFR 101-26.505-3 - Requests to procure similar items from sources other than GSA supply sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requests to procure... Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement Programs § 101-26...
1991-12-01
associated with ADP/FIP protests. Navy and Marine Corps contracting agencies w\\ere contacted to determine their current experience in ADP/’FIP contracting...an emphasis on the GSBCA. A protestor has many options in vhich to "avenge" their wrong. A Contracting Officer can therefore expect a variety of...subject to their exclusive procurement authority. The term ADPE and ADP/FIP will be used somewhat loosely. In most cases, the acronyms include
Competition in the economic crisis: Analysis of procurement auctions.
Gugler, Klaus; Weichselbaumer, Michael; Zulehner, Christine
2015-01-01
We study the effects of the recent economic crisis on firms׳ bidding behavior and markups in sealed bid auctions. Using data from Austrian construction procurements, we estimate bidders׳ construction costs within a private value auction model. We find that markups of all bids submitted decrease by 1.5 percentage points in the recent economic crisis, markups of winning bids decrease by 3.3 percentage points. We also find that without the government stimulus package this decrease would have been larger. These two pieces of evidence point to pro-cyclical markups.
Managing EEE part standardisation and procurement
NASA Astrophysics Data System (ADS)
Serieys, C.; Bensoussan, A.; Petitmangin, A.; Rigaud, M.; Barbaresco, P.; Lyan, C.
2002-12-01
This paper presents the development activities in space components selection and procurement dealing with a new data base tool implemented at Alcatel Space using TransForm softwaa re configurator developed by Techform S.A. Based on TransForm, Access Ingenierie has devv eloped a software product named OLG@DOS which facilitate the part nomenclatures analyses for new equipment design and manufacturing in term of ACCESS data base implementation. Hi-Rel EEE part type technical, production and quality information are collected and compiled usingproduction data base issued from production tools implemented for equipment definition, description and production based on Manufacturing Resource Planning (MRP II Control Open) and Parametric Design Manager (PDM Work Manager). The analysis of any new equipment nomenclature may be conducted through this means for standardisation purpose, cost containment program and management procurement activities as well as preparation of Component reviews as Part Approval Document and Declared Part List validation.
Donor and procurement related issues in vascularized composite allograft transplantation.
McDiarmid, Sue V
2013-12-01
To understand the unique requirements of vascularized composite allograft (VCA) donation and procurement practices and the integral role of the established nationwide organ procurement organizations in organ procurement. The recent issuance of a Final Rule (July 2013) by the United States Secretary of Health that redefines VCAs as organs rather than tissues, opens up the potential to formalize policies and procedures, under the auspices of the Organ Procurement and Transplantation Network, that can improve VCA donation, procurement practices, develop allocation algorithms and provide transparent oversight. Improved VCA donation rates, procurement procedures and broader sharing nationwide of VCA donors will have important implications in advancing the emerging field of VCA transplantation.
Modal analysis for Liapunov stability of rotating elastic bodies. Ph.D. Thesis. Final Report
NASA Technical Reports Server (NTRS)
Colin, A. D.
1973-01-01
This study consisted of four parallel efforts: (1) modal analyses of elastic continua for Liapunov stability analysis of flexible spacecraft; (2) development of general purpose simulation equations for arbitrary spacecraft; (3) evaluation of alternative mathematical models for elastic components of spacecraft; and (4) examination of the influence of vehicle flexibility on spacecraft attitude control system performance. A complete record is given of achievements under tasks (1) and (3), in the form of technical appendices, and a summary description of progress under tasks two and four.
Effect of the mass center shift for force-free flexible spacecraft
NASA Technical Reports Server (NTRS)
Meirovitch, L.; Juang, J.-N.
1975-01-01
For a spinning flexible spacecraft the mass center generally shifts relative to the nominal undeformed position. It is thought that this shift of center complicates spacecraft stability analysis. It is proved, on the basis of results achieved by Meirovitch and Calico (1972), that for the general class of force-free single-spin flexible spacecraft it is possible to ignore this shift of center without affecting the stability criteria in any significant way. A new theorem on inequalities for quadratic forms is proved to demonstrate the validity of the stability analysis.
Ohkawara, H; Fukushima, N; Kitagawa, T; Ito, T; Masutani, Y; Sawa, Y
2010-01-01
Although organ procurement has been regulated by The Organ Transplantation Law (brain-dead donors since 1997, donors after cardiac death since 1979), there has been no law or governmental procurement network (except for cornea) in Japan. Since the late 1980s, some university hospitals have developed original banks. Finally, in 2001 guidelines for tissue procurement were established by The Japanese Society of Tissue Transplantation and Japan Tissue Transplant Network (JTTN) to coordinate tissue harvesting. Five tissue banks were joined to the tissue transplant network (skin in one, heart valves in two, and bone in two). As the number of tissue banks is small, each bank cooperates on procurement, but cannot cover the entire country. With regard to skin transplantation, only one skin bank-The Japan Skin Bank Network (JSBN), which is located in Tokyo-has organized skin procurement. Therefore, it has been difficult to procure skin in areas distant from Tokyo, especially around Osaka. In order to improve such a situation, a tissue bank collaborating with the JSBN was established at The Medical Center for Translational Research (MTR), Osaka University Hospital in April 2008. The bank has played a role in skin procurement center in western Japan and supported procurement and preservation at the time of the skin procurement. Between April 2008 and September 2009, the bank participated in eight tissue procurements in the western area. In the future, the bank is planning to procure and preserve pancreatic islets and bones. Moreover, there is a plan to set up an induced pluripotent stem cells center and stem cell bank in MTR. This tissue bank may play a role to increase tissue procurement in Japan, especially in the western area. .
1985-09-01
courses for a concentration in procurement and materials management: Procurement and Materials Management Procurement Contract Law Systems Procurement...for contracting in the public sector (Procurement Contract Law ). The respondents did not agree as much with this question as they did with the...the results of this section proved quite different from the group as a whole. Contract Law , Contract Negotiations, Pricing, Procurement Management
45 CFR 74.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 1 2011-10-01 2011-10-01 false Cost and price analysis. 74.45 Section 74.45 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE... connection with every procurement action. Price analysis may be accomplished in various ways, including the...
45 CFR 74.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 1 2010-10-01 2010-10-01 false Cost and price analysis. 74.45 Section 74.45 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION UNIFORM ADMINISTRATIVE... connection with every procurement action. Price analysis may be accomplished in various ways, including the...
Tissue procurement and transplantation: a Tuscany perspective.
Filipponi, F; De Simone, P; Saviozzi, A; Bozzi, G
2008-01-01
Tissue procurement and transplantation are rarely taken into account as indicators of the efficiency of a regional donor procurement network. We present herein a retrospective review on Tuscany tissue procurement activities from 2004 until 2006. In 2003 the Tuscan Regional Government appointed a transplantation service authority to reorganize all regional donation and transplantation activities: the Organizzazione Toscana Trapianti (OTT). The regional tissue procurement network was based on either brain death (BD) and cardiac death (CD) donors under the responsibility of in-hospital transplantation coordinators (IHTCs). From 2004 to 2006, a total of 397 tissue donors were procured in Tuscany, and 4151 tissue transplantations were performed: 2909 skin grafts, 1209 bone grafts, and 33 heart valves. Over the same period, a total of 2116 cornea donors were procured; 4117 corneas were retrieved; 1779 were fit for transplantation, and 1418 were transplanted. Based on our experience, implementation of tissue procurement requires use of BD donors and paramount organizational efforts from IHTCs.
Interactive systems design and synthesis of future spacecraft concepts
NASA Technical Reports Server (NTRS)
Wright, R. L.; Deryder, D. D.; Ferebee, M. J., Jr.
1984-01-01
An interactive systems design and synthesis is performed on future spacecraft concepts using the Interactive Design and Evaluation of Advanced spacecraft (IDEAS) computer-aided design and analysis system. The capabilities and advantages of the systems-oriented interactive computer-aided design and analysis system are described. The synthesis of both large antenna and space station concepts, and space station evolutionary growth is demonstrated. The IDEAS program provides the user with both an interactive graphics and an interactive computing capability which consists of over 40 multidisciplinary synthesis and analysis modules. Thus, the user can create, analyze and conduct parametric studies and modify Earth-orbiting spacecraft designs (space stations, large antennas or platforms, and technologically advanced spacecraft) at an interactive terminal with relative ease. The IDEAS approach is useful during the conceptual design phase of advanced space missions when a multiplicity of parameters and concepts must be analyzed and evaluated in a cost-effective and timely manner.
The Ocean Surface Topography JASON-CS/SENTINEL-6 Mission
NASA Astrophysics Data System (ADS)
Cullen, R.; Francis, R.
2014-12-01
The Jason-CS/Sentinel-6 programme will consist of 2 spacecraft and will be the latest in a series of ocean surface topography missions that will span nearly three decades. They follow the altimeters on-board TOPEX/Poseidon through to Jason-3 (expected March 2015). Jason-CS will continue to fulfil objectives of the reference series whilst introducing a major enhancement in capability providing the operational and science oceanographic community with the state of the art in terms of platform, measurement instrumentation design thus securing optimal operational and science data return. The programme is a part of the EC Copernicus initiative, whose objective is to support Europe's goals regarding sustainable development and global governance of the environment by providing timely and quality data, information, services and knowledge. The programme brings together: ESA for development, procurement & early orbit activities; EUMETSAT for mission management, ground segment, flight ops, contributing funding of the 1st satellite and participation in funding for the 2nd satellite; NOAA for US payload instruments, launcher, ground stations & operations; NASA for developing the US payload, launcher procurement and funding US science; EU for funding the operations and participation in funding (with EUMETSAT) for the 2nd satellite; CNES for mission expertise and provision of POD. The consortium plan to procure 2 satellites with the 1st planned for launch readiness in the 1st half of 2020 with the 2nd satellite 5 years later. The first major commitment to funding was given by the ESA member states that approved the programme in June 2014 and in addition the European Union funding is also secure. The design will be based on a platform derived from CryoSat-2 but adjusted to the specific requirements of the higher orbit. The principle payload instrument is a high precision Ku/C band radar altimeter with retrieval of geophysical parameters (surface elevation, wind speed and SWH) from the altimeter data require supporting measurements: a DORIS receiver for POD; The Climate Quality Advanced Microwave Radiometer (AMR-C) provided by JPL for high stability path delay correction. Orbit tracking data are also provided by GPS & LRA. An additional US GPS receiver, GNSS-RO, will be dedicated to radio-occultation measurements.
Aycart, Mario A; Alhefzi, Muayyad; Sharma, Gaurav; Krezdorn, Nicco; Bueno, Ericka M; Talbot, Simon G; Carty, Matthew J; Tullius, Stefan G; Pomahac, Bohdan
2017-06-01
Current knowledge of the impact of facial vascularized composite allograft (VCA) procurement on the transplantation outcomes of the concomitantly recovered solid organs is limited to isolated case reports and short-term results. Here we report on a nationwide analysis of facial allograft donor surgery experience and long-term outcomes of the concomitantly recovered solid organs and their recipients. There were 10 facial VCA procurements in organ donors between December 2008 and October 2014. We identified the population of subjects who received solid organs from these 10 donors using the Scientific Registry of Transplant Recipients. We retrospectively reviewed operative characteristics, intraoperative parameters, and postoperative outcomes. Six of 10 donor surgeries were performed at outside institutions, all on brain-dead donors. Mean operative duration for facial VCA recovery was 6.9 hours (range, 4-13.25 hours). A total of 36 solid organs were recovered and transplanted into 35 recipients. Survival rates for kidney and liver recipients were 100% and 90% at a median follow-up of 33 and 27.5 months, respectively (range, 6-72 months). Graft survival rates for kidneys and livers were 15 of 16 (94%) and 9 of 10 (90%), respectively. Recipient and graft survival rates for hearts and lungs were 75% (n = 4) and 100% (n = 3) at mean follow-up time of 14.75 and 16 months, respectively. A liver recipient died at 22 months from unknown causes and a heart recipient died of leukemia at 10 months. Facial VCA procurement does not appear to adversely affect the outcomes of transplant recipients of concomitantly recovered solid organ allografts.
Aerothermal Analysis and Design of the Gravity Recovery and Climate Experiment (GRACE) Spacecraft
NASA Technical Reports Server (NTRS)
Mazanek, Daniel D.; Kumar, Renjith R.; Qu, Min; Seywald, Hans
2000-01-01
The Gravity Recovery and Climate Experiment (GRACE) primary mission will be performed by making measurements of the inter-satellite range change between two co-planar, low altitude near-polar orbiting satellites. Understanding the uncertainties in the disturbance environment, particularly the aerodynamic drag and torques, is critical in several mission areas. These include an accurate estimate of the spacecraft orbital lifetime, evaluation of spacecraft attitude control requirements, and estimation of the orbital maintenance maneuver frequency necessitated by differences in the drag forces acting on both satellites. The FREEMOL simulation software has been developed and utilized to analyze and suggest design modifications to the GRACE spacecraft. Aerodynamic accommodation bounding analyses were performed and worst-case envelopes were obtained for the aerodynamic torques and the differential ballistic coefficients between the leading and trailing GRACE spacecraft. These analyses demonstrate how spacecraft aerodynamic design and analysis can benefit from a better understanding of spacecraft surface accommodation properties, and the implications for mission design constraints such as formation spacing control.
Procurement Procurement The National Renewable Energy Laboratory (NREL) offers numerous procurement source of biofuels. Register Your Small Business NREL welcomes small, disadvantaged, HUBzone, veteran -owned, and women-owned business vendors and subcontractors. Register today
DOT National Transportation Integrated Search
2013-04-01
Established in 1995 as the Florida Vehicle : Procurement Program (FVPP), Florida Transit : Research Inspection Procurement Services (TRIPS) : is a vehicle sourcing and procurement system for : Floridas public transit agencies that integrates : ins...
Analysis of Surface Charging for a Candidate Solar Sail Mission Using NASCAP-2K
NASA Technical Reports Server (NTRS)
Parker, Linda Neergaard; Minow, Joseph L.; Davis, V. A.; Mandell, Myron; Gardner, Barbara
2005-01-01
The characterization of the electromagnetic interaction for a solar sail in the solar wind environment and identification of viable charging mitigation strategies are critical solar sail mission design tasks. Spacecraft charging has important implications both for science applications and for lifetime and reliability issues of sail propulsion systems. To that end, surface charging calculations of a candidate 150-meter-class solar sail spacecraft for the 0.5 AU solar polar and 1.9 AU LI solar wind environments are performed. A model of the spacecraft with candidate materials having appropriate electrical properties is constructed using Object Toolkit. The spacecraft charging analysis is performed using Nascap-2k. the NASA/AFRL sponsored spacecraft charging analysis tool. Nominal and atypical solar wind environments appropriate for the 0.5 AU and 1.0 AU missions are used to establish current collection of solar wind ions and electrons. Finally, a geostationary orbit environment case is included to demonstrate a bounding example of extreme (negative) charging of a solar sail spacecraft. Results from the charging analyses demonstrate that minimal differential potentials (and resulting threat of electrostatic discharge) occur when the spacecraft is constructed entirely of conducting materials, as anticipated from standard guidelines for mitigation of spacecraft charging issues. Examples with dielectric materials exposed to the space environment exhibit differential potentials ranging from a few volts to extreme potentials in the kilovolt range.
Analysis of Surface Charging for a Candidate Solar Sail Mission Using Nascap-2k
NASA Technical Reports Server (NTRS)
Parker, Linda Neergaard; Minow, Joseph I.; Davis, Victoria; Mandell, Myron; Gardner, Barbara
2005-01-01
The characterization of the electromagnetic interaction for a solar sail in the solar wind environment and identification of viable charging mitigation strategies are critical solar sail mission design task. Spacecraft charging has important implications both for science applications and for lifetime and reliability issues of sail propulsion systems. To that end, surface charging calculations of a candidate 150-meter-class solar sail spacecraft for the 0.5 AU solar polar and 1.0 AU L1 solar wind environments are performed. A model of the spacecraft with candidate materials having appropriate electrical properties is constructed using Object Toolkit. The spacecraft charging analysis is performed using Nascap-2k, the NASA/AFRL sponsored spacecraft charging analysis tool. Nominal and atypical solar wind environments appropriate for the 0.5 AU and 1.0 AU missions are used to establish current collection of solar wind ions and electrons. Finally, a geostationary orbit environment case is included to demonstrate a bounding example of extreme (negative) charging of a solar sail spacecraft. Results from the charging analyses demonstrate that minimal differential potentials (and resulting threat of electrostatic discharge) occur when the spacecraft is constructed entirely of conducting materials, as anticipated from standard guidelines for mitigation of spacecraft charging issues. Examples with dielectric materials exposed to the space environment exhibit differential potentials ranging from a few volts to extreme potentials in the kilovolt range.
Applying e-procurement system in the healthcare: the EPOS paradigm
NASA Astrophysics Data System (ADS)
Ketikidis, Panayiotis H.; Kontogeorgis, Apostolos; Stalidis, George; Kaggelides, Kostis
2010-03-01
One of the goals of procurement is to establish a competitive price, while e-procurement utilises electronic commerce to identify potential sources of supply, to purchase goods and services, to exchange contractual information and to interact with suppliers. Extensive academic work has been extensively devoted to e-procurement in diverse industries. However, applying e-procurement in the healthcare sector remains unexplored. It lacks an efficient e-procurement mechanism that will enable hospitals and healthcare suppliers to electronically exchange contractual information, aided by the technologies of optimisation and business rules. The development and deployment of e-procurement requires a major effort in the coordination of complex interorganisational business process. This article presents an e-procurement optimised system (EPOS) for the healthcare marketplace, a complete methodological approach for deploying and operating such system, as piloted in public and private hospitals in three European countries (Greece, Spain and Belgium) and suppliers of healthcare items in the fourth country (Italy). The efficient e-procurement mechanism that EPOS suggests enables hospitals and pharmaceutical and medical equipment suppliers to electronically exchange contractual information.
45 CFR 2543.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Cost and price analysis. 2543.45 Section 2543.45... ORGANIZATIONS Post-Award Requirements Property Standards § 2543.45 Cost and price analysis. Some form of cost or price analysis shall be made and documented in the procurement files in connection with every...
22 CFR 226.45 - Cost and price analysis.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Cost and price analysis. 226.45 Section 226.45 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.45 Cost and price analysis. Some...
24 CFR 963.12 - Alternative procurement process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT PUBLIC HOUSING-CONTRACTING WITH RESIDENT-OWNED BUSINESSES Contracting With Resident-Owned Businesses § 963.12 Alternative procurement process. (a) Method of procurement. In contracting with resident-owned businesses, the PHA shall follow the applicable method of procurement as set forth...
36 CFR 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards... in various ways, including the comparison of price quotations submitted, market prices and similar...
36 CFR 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards... in various ways, including the comparison of price quotations submitted, market prices and similar...
36 CFR 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards... in various ways, including the comparison of price quotations submitted, market prices and similar...
A new environment for multiple spacecraft power subsystem mission operations
NASA Technical Reports Server (NTRS)
Bahrami, K. A.
1990-01-01
The engineering analysis subsystem environment (EASE) is being developed to enable fewer controllers to monitor and control power and other spacecraft engineering subsystems. The EASE prototype has been developed to support simultaneous real-time monitoring of several spacecraft engineering subsystems. It is being designed to assist with offline analysis of telemetry data to determine trends, and to help formulate uplink commands to the spacecraft. An early version of the EASE prototype has been installed in the JPL Space Flight Operations Facility for online testing. The EASE prototype is installed in the Galileo Mission Support Area. The underlying concept, development, and testing of the EASE prototype and how it will aid in the ground operations of spacecraft power subsystems are discussed.
Orbital thermal analysis of lattice structured spacecraft using color video display techniques
NASA Technical Reports Server (NTRS)
Wright, R. L.; Deryder, D. D.; Palmer, M. T.
1983-01-01
A color video display technique is demonstrated as a tool for rapid determination of thermal problems during the preliminary design of complex space systems. A thermal analysis is presented for the lattice-structured Earth Observation Satellite (EOS) spacecraft at 32 points in a baseline non Sun-synchronous (60 deg inclination) orbit. Large temperature variations (on the order of 150 K) were observed on the majority of the members. A gradual decrease in temperature was observed as the spacecraft traversed the Earth's shadow, followed by a sudden rise in temperature (100 K) as the spacecraft exited the shadow. Heating rate and temperature histories of selected members and color graphic displays of temperatures on the spacecraft are presented.
Caremans, Jeroen; Hamans, Evert; Muylle, Ludo; Van de Heyning, Paul; Van Rompaey, Vincent
2016-06-01
Allograft tympano-ossicular systems (ATOS) have proven their use over many decades in tympanoplasty and reconstruction after resection of cholesteatoma. The transcranial bone plug technique has been used in the past 50 years to procure en bloc ATOS (tympanic membrane with malleus, incus and stapes attached). Recently, our group reported the feasibility of the endoscopic procurement technique. The aim of this study was to assess whether clinical outcome is equivalent in ATOS acquired by using the endoscopic procurement technique compared to ATOS acquired by using the transcranial technique. A double-blind randomized controlled audit was performed in a tertiary referral center in patients that underwent allograft tympanoplasty because of chronic otitis media with and without cholesteatoma. Allograft epithelialisation was evaluated at the short-term postoperative visit by microscopic examination. Failures were reported if reperforation was observed. Fifty patients underwent allograft tympanoplasty: 34 received endoscopically procured ATOS and 16 received transcranially procured ATOS. One failed case was observed, in the endoscopic procurement group. We did not observe a statistically significant difference between the two groups in failure rate. This study demonstrates equivalence of the clinical outcome of allograft tympanoplasty using either endoscopic or transcranial procured ATOS and therefore indicates that the endoscopic technique can be considered the new standard procurement technique. Especially because the endoscopic procurement technique has several advantages compared to the former transcranial procurement technique: it avoids risk of prion transmission and it is faster while lacking any noticeable incision.
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 12 2012-01-01 2012-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 12 2013-01-01 2013-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 12 2014-01-01 2013-01-01 true Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
7 CFR 1780.72 - Procurement methods.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...
22 CFR 226.46 - Procurement records.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...
76 FR 12016 - Local and Regional Food Aid Procurement Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... DEPARTMENT OF AGRICULTURE Foreign Agricultural Service Local and Regional Food Aid Procurement... field-based projects under the USDA Local and Regional Food Aid Procurement Pilot Project (USDA LRP..., 2011. FOR FURTHER INFORMATION CONTACT: Jamie Fisher, Chief, Local and Regional Procurement, Food...
48 CFR 2401.601-70 - Senior Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Senior Procurement... Authority, and Responsibilities 2401.601-70 Senior Procurement Executive. Unless otherwise designated by the Secretary through a delegation of authority, the Chief Procurement Officer is the Department's Senior...
78 FR 20783 - Designation of Product Categories for Federal Procurement; Withdrawal
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
... Designation of Product Categories for Federal Procurement; Withdrawal AGENCY: Office of Procurement and.... Department of Agriculture (USDA) is withdrawing the final rule ``Designation of Product Categories for... product categories within which biobased products will be afforded Federal procurement preference, was...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Procurement. 203.13 Section 203.13 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS... small businesses, and will be conducted as competitive procurements. Procurements below a value of $2...
48 CFR 702.170-13 - Procurement Executive.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Procurement Executive. 702.170-13 Section 702.170-13 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL DEFINITIONS OF WORDS AND TERMS Definitions 702.170-13 Procurement Executive. “Procurement...
10 CFR 436.43 - Procurement planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...
23 CFR 172.5 - Methods of procurement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... proposal solicitation (project, task, or service) process shall be by public announcement, advertisement... ENGINEERING AND DESIGN RELATED SERVICE CONTRACTS § 172.5 Methods of procurement. (a) Procurement. The procurement of Federal-aid highway contracts for engineering and design related services shall be evaluated...
Code of Federal Regulations, 2011 CFR
2011-07-01
... LITIGATION Remedies in Procurement Fraud and Corruption § 516.58 Policies. (a) Procurement fraud and... administrative remedies in significant cases of fraud or corruption relating to Army procurement. (d) The key... of fraud or corruption involving procurement. (g) Coordination on the status and disposition of cases...
High Speed Solution of Spacecraft Trajectory Problems Using Taylor Series Integration
NASA Technical Reports Server (NTRS)
Scott, James R.; Martini, Michael C.
2008-01-01
Taylor series integration is implemented in a spacecraft trajectory analysis code-the Spacecraft N-body Analysis Program (SNAP) - and compared with the code s existing eighth-order Runge-Kutta Fehlberg time integration scheme. Nine trajectory problems, including near Earth, lunar, Mars and Europa missions, are analyzed. Head-to-head comparison at five different error tolerances shows that, on average, Taylor series is faster than Runge-Kutta Fehlberg by a factor of 15.8. Results further show that Taylor series has superior convergence properties. Taylor series integration proves that it can provide rapid, highly accurate solutions to spacecraft trajectory problems.
NASA Technical Reports Server (NTRS)
Park, Nohpill; Reagan, Shawn; Franks, Greg; Jones, William G.
1999-01-01
This paper discusses analytical approaches to evaluating performance of Spacecraft On-Board Computing systems, thereby ultimately achieving a reliable spacecraft data communications systems. The sensitivity analysis approach of memory system on the ProSEDS (Propulsive Small Expendable Deployer System) as a part of its data communication system will be investigated. Also, general issues and possible approaches to reliable Spacecraft On-Board Interconnection Network and Processor Array will be shown. The performance issues of a spacecraft on-board computing systems such as sensitivity, throughput, delay and reliability will be introduced and discussed.
Ethics and regulation in organ procurement research.
Ackerman, Terrence F; Winsett, Rebecca P
2002-12-01
This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.
The learning curves in living donor hemiliver graft procurement using small upper midline incision.
Ikegami, Toru; Harimoto, Norifumi; Shimokawa, Masahiro; Yoshizumi, Tomoharu; Uchiyama, Hideaki; Itoh, Shinji; Okabe, Norihisa; Sakata, Kazuhito; Nagatsu, Akihisa; Soejima, Yuji; Maehara, Yoshihiko
2016-12-01
The learning curve for performing living donor hemiliver procurement (LDHP) via small upper midline incision (UMI) has not been determined. Living donors (n=101) who underwent LDHP via UMI were included to investigate the learning curve using cumulative sum analysis. The cumulative sum analysis showed that nine cases for right lobe (case #23) and 19 cases for left lobe (case #32 in the whole series) are needed for stable and acceptable surgical outcomes in LDHP via UMI. The established phase (n=69, since case #33) had a significantly shorter operative time, a smaller incision size, and less blood loss than the previous learning phase (n=32, serial case number up to the last 19th left lobe case). Multivariate analysis showed that the learning phase, high body mass index ≥25 kg/m 2 , and left lobe graft procurement are the factors associated with surgical events including operative blood loss ≥400 mL, operative time ≥300 minutes, or surgical complications ≥Clavien-Dindo grade II. There is an obvious learning curve in performing LDHP via UMI, and 32 cases including both 19 cases for left lobe and nine cases for right lobe are needed for having stable and acceptable surgical outcomes. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.
Bacillus Calmette-Guérin (BCG) vaccine: A global assessment of demand and supply balance.
Cernuschi, Tania; Malvolti, Stefano; Nickels, Emily; Friede, Martin
2018-01-25
Over the past decade, several countries across all regions, income groups and procurement methods have been unable to secure sufficient BCG vaccine supply. While the frequency of stock-outs has remained rather stable, duration increased in 2014-2015 due to manufacturing issues and attracted the attention of national, regional and global immunization stakeholders. This prompted an in-depth analysis of supply and demand dynamics aiming to characterize supply risks. This analysis is unique as it provides a global picture, where previous analyses have focused on a portion of the market procuring through UN entities. Through literature review, supplier interviews, appraisal of shortages, stock-outs and historical procurement data, and through demand forecasting, this analysis shows an important increase in global capacity in 2017: supply is sufficient to meet forecasted BCG vaccine demand and possibly buffer market shocks. Nevertheless, risks remain mainly due to supply concentration and limited investment in production process improvements, as well as inflexibility in demand. Identification of these market risks will allow implementation of risk-mitigating interventions in three areas: (1) enhancing information sharing between major global health actors, countries and suppliers, (2) identifying interests and incentives to expand product registration and investment in the BCG manufacturing process, and (3) working with countries for tighter vaccine management. Copyright © 2017. Published by Elsevier Ltd.
Automating Structural Analysis of Spacecraft Vehicles
NASA Technical Reports Server (NTRS)
Hrinda, Glenn A.
2004-01-01
A major effort within NASA's vehicle analysis discipline has been to automate structural analysis and sizing optimization during conceptual design studies of advanced spacecraft. Traditional spacecraft structural sizing has involved detailed finite element analysis (FEA) requiring large degree-of-freedom (DOF) finite element models (FEM). Creation and analysis of these models can be time consuming and limit model size during conceptual designs. The goal is to find an optimal design that meets the mission requirements but produces the lightest structure. A structural sizing tool called HyperSizer has been successfully used in the conceptual design phase of a reusable launch vehicle and planetary exploration spacecraft. The program couples with FEA to enable system level performance assessments and weight predictions including design optimization of material selections and sizing of spacecraft members. The software's analysis capabilities are based on established aerospace structural methods for strength, stability and stiffness that produce adequately sized members and reliable structural weight estimates. The software also helps to identify potential structural deficiencies early in the conceptual design so changes can be made without wasted time. HyperSizer's automated analysis and sizing optimization increases productivity and brings standardization to a systems study. These benefits will be illustrated in examining two different types of conceptual spacecraft designed using the software. A hypersonic air breathing, single stage to orbit (SSTO), reusable launch vehicle (RLV) will be highlighted as well as an aeroshell for a planetary exploration vehicle used for aerocapture at Mars. By showing the two different types of vehicles, the software's flexibility will be demonstrated with an emphasis on reducing aeroshell structural weight. Member sizes, concepts and material selections will be discussed as well as analysis methods used in optimizing the structure. Analysis based on the HyperSizer structural sizing software will be discussed. Design trades required to optimize structural weight will be presented.
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
7 CFR 3019.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
7 CFR 3019.45 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
22 CFR 145.45 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... ways, including the comparison of price quotations submitted, market prices and similar indicia...
7 CFR 3019.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
24 CFR 84.45 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-04-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... ways, including the comparison of price quotations submitted, market prices and similar indicia...
Implications of arcing due to spacecraft charging on spacecraft EMI margins of immunity
NASA Technical Reports Server (NTRS)
Inouye, G. T.
1981-01-01
Arcing due to spacecraft charging on spacecraft EMI margins of immunity was determined. The configuration of the P78-2 spacecraft of the SCATHA program was analyzed. A brushfire arc discharge model was developed, and a technique for initiating discharges with a spark plug trigger was for data configuration. A set of best estimate arc discharge parameters was defined. The effects of spacecraft potentials in limiting the discharge current blowout component are included. Arc discharge source models were incorporated into a SEMCAP EMI coupling analysis code for the DSP spacecraft. It is shown that with no mission critical circuits will be affected.
Code of Federal Regulations, 2010 CFR
2010-04-01
... more economical purchase. Where appropriate, an analysis must be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To foster... negotiated prices are consistent with Federal cost principles (see § 437.22). Grantees may reference their...
7 CFR 1778.22 - Planning development and procurement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development and procurement. 1778.22 Section 1778.22 Agriculture Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE... Planning development and procurement. Planning development and procurement for grants made under this part...
Procurement Career Management Handbook.
ERIC Educational Resources Information Center
Department of the Treasury, Washington, DC.
This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 3 2014-07-01 2014-07-01 false Procurement. 553.11 Section 553.11 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY MILITARY RESERVATIONS AND NATIONAL CEMETERIES ARMY NATIONAL CEMETERIES § 553.11 Procurement. Cemetery supplies and services will be procured in...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data... close of the fourth quarter. Specific preparation procedures are contained in the FPDS Reporting Manual...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
48 CFR 2804.602 - Federal Procurement Data System.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Small and Disadvantaged Business Utilization (OSDBU) as required by that office. (c) BPCs shall provide... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Federal Procurement Data... ADMINISTRATIVE MATTERS Contract Reporting 2804.602 Federal Procurement Data System. (a) Federal Procurement Data...
Proceedings: 1990 EPRI gas turbine procurement seminar
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, B.L.; Miller, M.N.
1991-06-01
This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less
Survey of U.S. Organ Procurement Organizations Regarding Pediatric Organ Donor Management.
Ream, Robert S; Armbrecht, Eric S
2016-10-01
To describe the current practice of pediatric organ donor management in the United States for donors declared dead based upon neurologic criteria. The study directs particular attention to how pediatric donors are defined, the use of donor management guidelines, the use of donor management goals, and the involvement of pediatric critical care or transplantation expertise. Cross-sectional observational study using a web-based survey and follow-up telephone interview with respondents from U.S. organ procurement organizations. The study also incorporated organ procurement organization-specific data on organ yield for the 4-year period (2010-2013) preceding the study. The 58 U.S. organ procurement organizations. Respondents chosen by each organ procurement organization. None. All 58 U.S. organ procurement organizations participated in the study. Fifty-two respondents (90%) indicated that their organ procurement organization distinguished pediatric from adult donors resulting in 28 unique pediatric definitions. Thirty-nine organ procurement organizations utilized some form of written pediatric management guidelines, and 27 (47%) maintained pediatric donor management goals; compliance was infrequently monitored for both guidelines (28%) and goals (33%). A pediatric intensivist was always or usually involved in pediatric donor management at 47 organ procurement organizations (81%); transplant/organ recovery surgeons were always or usually involved at 12 organ procurement organizations (21%). There was an increase in the number of organs transplanted per donor among donors 11-17 years old for organ procurement organizations that used donor management goals for the duration of the period studied (p < 0.01). There was also an increase in the ratio of observed/expected organs transplanted among donors of 0-10 years old for organ procurement organizations that always or usually consulted a transplant/organ recovery surgeon (p = 0.02) although this did not reach our threshold for statistical significance.. There is little consensus among organ procurement organizations regarding the definition of "pediatric" during organ donor management. Most organ procurement organizations employ written pediatric guidelines and use pediatric intensive care physicians for assistance in managing these donors. There is a positive association between the use of donor management goals and organ yield among pediatric donors in the 11- to 17-year age group.
Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis
2016-08-08
We know little about how procurement of a high-risk medical device (HRMD) affects clinical practice and outcomes. In health systems in high-income countries, and specifically those that maintain a national arthroplasty registry, procurement decisions are frequently guided by long-term clinical results, with the goal of ensuring at least standard quality of HRMDs. But in countries like Mexico, decision-making is often dominated by lowest acquisition price. We set out to study the impact of procurement for orthopaedic HRMDs on clinical procedures and outcomes. We based our qualitative study on 59 in-depth interviews with stakeholders from Mexico, Switzerland, Germany, and UK: orthopaedic specialists, government officials, other experts, and social security system managers or administrators. We took a healthcare delivery approach to capturing and comparing factors that affected the regulations of HRMDs and procurement processes, and to understanding connections between procurement and clinical practice. Our findings demonstrate for procurement processes that the three European countries compared to Mexico don't have similar concerns with regards to their procurement processes. Deficiencies of procurement regulations and practices identified from representatives in Mexico were almost absent in European countries. We identified three areas of deficiency: 1) HRMD regulations based on insufficiently robust clinical evidence (mainly noted by European countries); 2) Follow-up on Health Technology Assessments is inadequate (noted by Mexico) and methodology not always good enough (noted by European countries); and, 3) Lowest-acquisition price often guides procurement decisions and thus may not align with needs of clinical procedures (noted by Mexico and some European countries). Procurement processes for orthopaedic HRMDs may have an impact on clinical procedures and outcomes. A favourable approach is one where orthopaedic specialists are parties to the procurement process, and post-market surveillance data informs decision-making. Actors in the procurement process can improve their impact on clinical procedures and outcomes by developing specific strategies that better align the needs of both, procurement and clinical procedures.
A user's guide to the Flexible Spacecraft Dynamics and Control Program
NASA Technical Reports Server (NTRS)
Fedor, J. V.
1984-01-01
A guide to the use of the Flexible Spacecraft Dynamics Program (FSD) is presented covering input requirements, control words, orbit generation, spacecraft description and simulation options, and output definition. The program can be used in dynamics and control analysis as well as in orbit support of deployment and control of spacecraft. The program is applicable to inertially oriented spinning, Earth oriented or gravity gradient stabilized spacecraft. Internal and external environmental effects can be simulated.
Procurement of a more efficient railroad system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detmold, P.J.
An analysis of how new technology penetrates the railroad system and who initiates the changes suggests ways for improving the procedures. The author identifies a six-step process in transport development which includes invention, innovation, information dissemination, and persuasion. He concludes that poor economic justification and the lack of capital explain the low rate of equipment replacement. The nature of the market and the need for standardized specification appear to influence procurement changes, but both suppliers and transport operators must be convinced of the need for change. The Advanced Train Control Systems Project illustrates how the initiation process works.
The co-existence of life and death for the perioperative nurse.
Perrin, Karen; Jones, Barbara; Winkelman, Cecelia
2013-10-01
Death and life co-exist in organ procurement surgery; untimely death for one provides hope for continued life for others. Drawing from interactionist theory, the impact of personal and environmental forces and functions specific to organ procurement surgery were examined. Seven nurses (6 women, 1 man aged 34-58 years) were provided with an opportunity to describe their experiences. Three core themes emerged from the qualitative analysis of the interviews: existential issues, coping strategies, and support for each other. Nurses spoke of ways in which they contribute to this challenging work and draw on inner resources.
Spacecraft Alignment Determination and Control for Dual Spacecraft Precision Formation Flying
NASA Technical Reports Server (NTRS)
Calhoun, Philip; Novo-Gradac, Anne-Marie; Shah, Neerav
2017-01-01
Many proposed formation flying missions seek to advance the state of the art in spacecraft science imaging by utilizing precision dual spacecraft formation flying to enable a virtual space telescope. Using precision dual spacecraft alignment, very long focal lengths can be achieved by locating the optics on one spacecraft and the detector on the other. Proposed science missions include astrophysics concepts with spacecraft separations from 1000 km to 25,000 km, such as the Milli-Arc-Second Structure Imager (MASSIM) and the New Worlds Observer, and Heliophysics concepts for solar coronagraphs and X-ray imaging with smaller separations (50m-500m). All of these proposed missions require advances in guidance, navigation, and control (GNC) for precision formation flying. In particular, very precise astrometric alignment control and estimation is required for precise inertial pointing of the virtual space telescope to enable science imaging orders of magnitude better than can be achieved with conventional single spacecraft instruments. This work develops design architectures, algorithms, and performance analysis of proposed GNC systems for precision dual spacecraft astrometric alignment. These systems employ a variety of GNC sensors and actuators, including laser-based alignment and ranging systems, optical imaging sensors (e.g. guide star telescope), inertial measurement units (IMU), as well as microthruster and precision stabilized platforms. A comprehensive GNC performance analysis is given for Heliophysics dual spacecraft PFF imaging mission concept.
Spacecraft Alignment Determination and Control for Dual Spacecraft Precision Formation Flying
NASA Technical Reports Server (NTRS)
Calhoun, Philip C.; Novo-Gradac, Anne-Marie; Shah, Neerav
2017-01-01
Many proposed formation flying missions seek to advance the state of the art in spacecraft science imaging by utilizing precision dual spacecraft formation flying to enable a virtual space telescope. Using precision dual spacecraft alignment, very long focal lengths can be achieved by locating the optics on one spacecraft and the detector on the other. Proposed science missions include astrophysics concepts with spacecraft separations from 1000 km to 25,000 km, such as the Milli-Arc-Second Structure Imager (MASSIM) and the New Worlds Observer, and Heliophysics concepts for solar coronagraphs and X-ray imaging with smaller separations (50m 500m). All of these proposed missions require advances in guidance, navigation, and control (GNC) for precision formation flying. In particular, very precise astrometric alignment control and estimation is required for precise inertial pointing of the virtual space telescope to enable science imaging orders of magnitude better than can be achieved with conventional single spacecraft instruments. This work develops design architectures, algorithms, and performance analysis of proposed GNC systems for precision dual spacecraft astrometric alignment. These systems employ a variety of GNC sensors and actuators, including laser-based alignment and ranging systems, optical imaging sensors (e.g. guide star telescope), inertial measurement units (IMU), as well as micro-thruster and precision stabilized platforms. A comprehensive GNC performance analysis is given for Heliophysics dual spacecraft PFF imaging mission concept.
Toward a Framework for Dynamic Service Binding in E-Procurement
NASA Astrophysics Data System (ADS)
Ashoori, Maryam; Eze, Benjamin; Benyoucef, Morad; Peyton, Liam
In an online environment, an E-Procurement process should be able to react and adapt in near real-time to changes in suppliers, requirements, and regulations. WS-BPEL is an emerging standard for process automation, but is oriented towards design-time binding of services. This missing issue can be resolved through designing an extension to WS-BPEL to support automation of flexible e-Procurement processes. Our proposed framework will support dynamic acquisition of procurement services from different suppliers dealing with changing procurement requirements. The proposed framework is illustrated by applying it to health care where different health insurance providers could be involved to procure the medication for patients.
Potential fraudulent behaviors in e-procurement implementation in Indonesia
NASA Astrophysics Data System (ADS)
Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.
2017-03-01
Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.
Terzaghi, Clara; Longo, Alessia; Legnani, Claudio; Bernasconi, Davide Paolo; Faré, Maristella
2015-03-01
The aim of this study was to analyze factors contributing to bacteriological contamination of bone and tendon allograft. Between 2008 and 2011, 2,778 bone and tendon allografts obtained from 196 organ and tissue donors or tissue donors only were retrospectively analysed. Several variables were taken into account: donor type (organ and tissue donors vs. tissue donor), cause of death, time interval between death and tissue procurement, duration of the procurement procedure, type of allografts, number of team members, number of trainees members, associated surgical procedures, positivity to haemoculture, type of procurement. The overall incidence of graft contamination was 23 %. The cause of death, the procurement time, the duration of procurement, the associated surgical procedures were not associated with increased risk of contamination. Significant effect on contamination incidence was observed for the number of staff members performing the procurement. In addition, our study substantiated significantly higher contamination rate among bone allografts than from tendon grafts. According to these observations, in order to minimize the contamination rate of procured musculoskeletal allografts, we recommend appropriate donor selection, use of standard sterile techniques, immediate packaging of each allograft to reduce graft exposure. Allograft procurement should be performed by a small surgical team.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-23
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available... FEDERAL ELECTION COMMISSION Public Availability of Federal Election Commission, Procurement... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), FEC PROCUREMENT DIVISION is publishing...
41 CFR 101-26.501-5 - Procurement time schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...
77 FR 65500 - Extension of Suspension and Debarment Exclusions, Grants and Cooperative Agreements
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-29
... Government procurement. William P. McNally, Assistant Administrator for Procurement. Accordingly, 2 CFR Part... proposes to extend coverage of nonprocurement suspension and debarment to all-tier procurement and non-procurement actions under all grants and cooperative agreements. DATES: Interested parties should submit...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... DEPARTMENT OF AGRICULTURE 48 CFR Part 422 RIN 0599-AA19 Office of Procurement and Property Management; Agriculture Acquisition Regulation, Labor Law Violations AGENCY: Office of Procurement and Property Management, Department of Agriculture. ACTION: Proposed rule. SUMMARY: The Office of Procurement...
78 FR 70022 - Procurement List; Proposed Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-22
.... ACTION: Proposed Additions to and Deletions from the Procurement List. SUMMARY: The Committee is proposing to add products and a service to the Procurement List that will be furnished by nonprofit agencies... the Procurement List for production by the nonprofit agencies listed: Products Kit, Paint...
77 FR 60969 - Procurement List; Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-05
... Procurement List. Notice Correction: On 9/28/2012 (77 FR 59595), the Committee for Purchase From People Who Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... and services to the Procurement List that will be furnished by nonprofit agencies employing persons...
75 FR 1355 - Procurement List Additions and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-11
...: Additions to and deletions from Procurement List. SUMMARY: This action adds to the Procurement List services... disabilities, and deletes from the Procurement List products and services previously furnished by such agencies... [email protected] . SUPPLEMENTARY INFORMATION: Additions On 11/6/2009 (74 FR 57453-57454), the...
76 FR 78248 - Procurement List; Addition and Deletions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
.... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...
24 CFR 84.84 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Procurement standards. 84.84... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Use of Lump Sum Grants § 84.84 Procurement standards. (a) Purpose of procurement standards. Paragraphs (b) through (i) of this section set forth...
13 CFR 305.6 - Allowable methods of procurement for construction services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Approved Projects § 305.6 Allowable methods of procurement for construction services. (a) Recipients may use alternate construction procurement methods to the traditional design/bid/build procedures... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Allowable methods of procurement...
7 CFR 235.9 - Procurement and property management standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Federal authority that has proper jurisdiction. (c) Procurement procedure. The State agency may use its... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
7 CFR 3565.257 - Procurement actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 15 2010-01-01 2010-01-01 false Procurement actions. 3565.257 Section 3565.257... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Property Requirements § 3565.257 Procurement actions. All construction procurement actions, whether by sealed bid or by negotiation, must be conducted in a manner that...
36 CFR § 1210.45 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-07-01
... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
Report on the Installation and Preparedness of a Protochips Fusion in-situ Heating Holder for TEM
DOE Office of Scientific and Technical Information (OSTI.GOV)
Edmondson, Philip D.
2017-03-01
This brief report documents the procurement and installation of a Protochips Fusion (formerly Aduro) high-temperature, high stability transmission electron microscopy (TEM) specimen holder that allows for the high spatial resolution characterization of material specimens at high temperature in situ of an electron microscope. This specimen holder was specifically procured for use with The FEI Talos F200X Scanning/Transmission Electron Microscope (STEM) in Oak Ridge National Laboratory’s (ORNL’s) Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Protochips Fusion holder will enable high-resolution structural and chemical analysis of irradiated materials at high temperature, becoming a unique capability worldwide, and would encourage high-qualitymore » in situ experiments to be conducted on irradiated materials.« less
NASA Technical Reports Server (NTRS)
Groves, Curtis; Ilie, Marcel; Schallhorn, Paul
2014-01-01
Spacecraft components may be damaged due to airflow produced by Environmental Control Systems (ECS). There are uncertainties and errors associated with using Computational Fluid Dynamics (CFD) to predict the flow field around a spacecraft from the ECS System. This paper describes an approach to estimate the uncertainty in using CFD to predict the airflow speeds around an encapsulated spacecraft.
Neptune aerocapture mission and spacecraft design overview
NASA Technical Reports Server (NTRS)
Bailey, Robert W.; Hall, Jeff L.; Spliker, Tom R.; O'Kongo, Nora
2004-01-01
A detailed Neptune aerocapture systems analysis and spacecraft design study was performed as part of NASA's In-Space Propulsion Program. The primary objectives were to assess the feasibility of a spacecraft point design for a Neptune/Triton science mission. That uses aerocapture as the Neptune orbit insertion mechanism. This paper provides an overview of the science, mission and spacecraft design resulting from that study.
The evolving trend in spacecraft health analysis
NASA Technical Reports Server (NTRS)
Kirkpatrick, Russell L.
1993-01-01
The Space Flight Operations Center inaugurated the concept of a central data repository for spacecraft data and the distribution of computing power to the end users for that data's analysis at the Jet Propulsion Laboratory. The Advanced Multimission Operations System is continuing the evolution of this concept as new technologies emerge. Constant improvements in data management tools, data visualization, and hardware lead to ever expanding ideas for improving the analysis of spacecraft health in an era of budget constrained mission operations systems. The foundation of this evolution, its history, and its current plans will be discussed.
NASA Technical Reports Server (NTRS)
Yee, C. P.; Kelbel, D. A.; Lee, T.; Dunham, J. B.; Mistretta, G. D.
1990-01-01
The influence of ionospheric refraction on orbit determination was studied through the use of the Orbit Determination Error Analysis System (ODEAS). The results of a study of the orbital state estimate errors due to the ionospheric refraction corrections, particularly for measurements involving spacecraft-to-spacecraft tracking links, are presented. In current operational practice at the Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF), the ionospheric refraction effects on the tracking measurements are modeled in the Goddard Trajectory Determination System (GTDS) using the Bent ionospheric model. While GTDS has the capability of incorporating the ionospheric refraction effects for measurements involving ground-to-spacecraft tracking links, such as those generated by the Ground Spaceflight Tracking and Data Network (GSTDN), it does not have the capability to incorporate the refraction effects for spacecraft-to-spacecraft tracking links for measurements generated by the Tracking and Data Relay Satellite System (TDRSS). The lack of this particular capability in GTDS raised some concern about the achievable accuracy of the estimated orbit for certain classes of spacecraft missions that require high-precision orbits. Using an enhanced research version of GTDS, some efforts have already been made to assess the importance of the spacecraft-to-spacecraft ionospheric refraction corrections in an orbit determination process. While these studies were performed using simulated data or real tracking data in definitive orbit determination modes, the study results presented here were obtained by means of covariance analysis simulating the weighted least-squares method used in orbit determination.
41 CFR 101-26.507-2 - Procurement time schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement...) Agreement on Government Procurement (GPA). Although the rule now opens up Government procurement to the... 48 CFR Parts 225 and 252 Government procurement. Kortnee Stewart, Editor, Defense Acquisition...
10 CFR 1021.216 - Procurement, financial assistance, and joint ventures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... a decision on proposals and will include: (1) A brief discussion of the purpose of the procurement... 10 Energy 4 2010-01-01 2010-01-01 false Procurement, financial assistance, and joint ventures... POLICY ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.216 Procurement, financial assistance, and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 2 2010-10-01 2010-10-01 false Payment of independent organ procurement... SKILLED NURSING FACILITIES Payment for End-Stage Renal Disease (ESRD) Services and Organ Procurement Costs § 413.200 Payment of independent organ procurement organizations and histocompatibility laboratories. (a...
7 CFR 225.17 - Procurement standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...
77 FR 37659 - Procurement List; Proposed Additions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... additions to the procurement list. SUMMARY: The Committee is proposing to add products and services to the...- 598-5067 and 1670-01-598-5071 to its Procurement List. The Coverage statement associated with this... connection with the products and services proposed for addition to the Procurement List. Comments on this...
32 CFR 37.1330 - Procurement contract.
Code of Federal Regulations, 2010 CFR
2010-07-01
... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...
10 CFR 603.1300 - Procurement contract.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...
31 CFR 19.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Are any procurement contracts....220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2...
29 CFR 98.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 1 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...
29 CFR 98.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 1 2010-07-01 2010-07-01 true Are any procurement contracts included as covered... SUSPENSION (NONPROCUREMENT) Covered Transactions § 98.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded...
29 CFR 1471.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 4 2011-07-01 2011-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...
29 CFR 1471.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 4 2010-07-01 2010-07-01 false Are any procurement contracts included as covered... Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do...
48 CFR 2406.304-70 - Approval of the justification-field procurements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Other Than Full and Open Competition 2406.304-70 Approval of the justification—field procurements. (a) The justification for other than full and open competition for field procurements shall be approved in... justification-field procurements. 2406.304-70 Section 2406.304-70 Federal Acquisition Regulations System...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Procurement. 627.420 Section 627.420... PROGRAMS UNDER TITLES I, II, AND III OF THE ACT Administrative Standards § 627.420 Procurement. (a) General. (1) For purposes of this section, the term procurement means the process which leads to any award of...
ERIC Educational Resources Information Center
Owusu-Manu, D.; Badu, E.; Edwards, D. J.
2011-01-01
Procurement in the corporate world is increasingly complex, multi-faceted and interdisciplinary. This paper explores existing knowledge specifications relating to procurement management competencies and proposes a new procurement management competency framework (PMCF) and a competency-based postgraduate programme for postgraduate students in…
Information Requirements for a Procurement Management Information System.
1975-08-01
Management Information System is...described and some justification for this type of procurement management information system is presented. A literature search was made to determine...information systems. If information requirements are correctly identified and satisfied by a procurement management information system , contract administration and procurement management can be
SOHO, an early start, a long lifetime
NASA Astrophysics Data System (ADS)
1996-01-01
SOHO currently cruises through space towards its station near the so-called first Lagrange point 1.5 million km towards the Sun where it will be in uninterrupted daylight and where the gravitational pull of the Sun and the Earth are balanced. The spacecraft is now expected to arrive at its station on 14 March 1996, two weeks earlier than originally planned. Coincidentally, this is the tenth anniversary of another space milestone, the encounter of ESA's Giotto probe with Comet Halley! An optimised orbit-shaping manoeuvre on 4 January, further refined SOHO's trajectory. Enough fuel remains on board to maintain SOHO's position in space for at least twenty instead of the planned six years. All systems of the 1850 kg spacecraft designed and built by European industry have been checked after launch and are in excellent shape. Their nominal performance has allowed an early and uninterrupted start of the commissioning of the scientific payload. SOHO's 12 scientific instruments* are currently being tested. Scientists are studying the first images and calibrating their instruments for the scheduled start of operations in late March. The craft's particle detectors investigating "in situ" the solar wind streaming around SOHO at its vantage point near Lagrange point 1, have been operational for some time and SOHO's first image of the Sun was taken on 19 December 1995. "All those who have worked tirelessly on the SOHO payload, spacecraft and ground-segment are to be congratulated on their excellent work and for having developed the most remarkable tool to help us understand the Sun and its environment, the heliosphere" said Roger Bonnet, ESA's Director of Science. According to present plans one month of early science is scheduled to begin around end of March and scientists hope to present their initial findings to the wide public by early May. SOHO is a project of international cooperation between ESA and NASA. The mission is led and coordinated by ESA who also procured the spacecraft; NASA provided the launch and operates the satellite. The European scientists who designed nine of the observatory's instruments and their US colleagues who built a further three are all present at Goddard Space Flight Center, where they jointly plan the optimum scientific use of the satellite. The spacecraft is part of the international Solar-Terrestrial Science Programme, the next member of which is Cluster, a flotilla of four spacecraft that will study how the Sun affects Earth and surrounding space. Cluster is scheduled for launch in May 1996 on the first Ariane 5 rocket. It will be the second mission belonging to the first "Cornerstone" of ESA's long- term scientific programme "Horizon 2000".
Code of Federal Regulations, 2010 CFR
2010-01-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 1273.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 1470.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-01-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 24.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-01-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 3016.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-10-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 92.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 43.22). Grantees may reference their own cost principles that...
41 CFR 105-71.136 - Procurement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To foster... consistent with Federal cost principles (see § 105-71.122). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 33.22). Grantees may reference their own cost principles that...
Code of Federal Regulations, 2010 CFR
2010-07-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 1207.22). Grantees may reference their own cost principles...
Code of Federal Regulations, 2010 CFR
2010-10-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 12.62). Grantees may reference their own cost principles that...
45 CFR 2541.360 - Procurement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... to obtain a more economical purchase. Where appropriate, an analysis will be made of lease versus purchase alternatives, and any other appropriate analysis to determine the most economical approach. (5) To... consistent with Federal cost principles (see § 2541.220). Grantees may reference their own cost principles...
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.145 Cost and..., including the comparison of price quotations submitted, market prices and similar indicia, together with...
14 CFR § 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260... ways, including the comparison of price quotations submitted, market prices and similar indicia...
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.145 Cost and..., including the comparison of price quotations submitted, market prices and similar indicia, together with...
14 CFR 1260.145 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.145 Cost and..., including the comparison of price quotations submitted, market prices and similar indicia, together with...
Effectiveness of large booms as nutation dampers for spin stabilized spacecraft
NASA Technical Reports Server (NTRS)
Eke, F. O.
1991-01-01
The issue of using long slender booms as pendulous nutation damping devices on spinning aircraft is discussed. Motivation comes from experience with the Galileo Spacecraft, whose magnetometer boom also serves as a passive nutation damper for the spacecraft. Performance analysis of a spacecraft system equipped with such systems are relatively insensitive to changes in the damping constant of the device. However, the size and arrangement of such a damper raises important questions concerning spacecraft stability in general.
45 CFR 307.15 - Approval of advance planning documents for computerized support enforcement systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... feasibility of the proposed effort and provide for the conduct of a requirements analysis study which address... indicate how the results of the requirements analysis study will be incorporated into the proposed system... address requirements analysis, program design, procurement and project management; and, a description of...
NRC assessment of improvements in licensee procurement and dedication programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grimes, B.K.; Potapovs, U.; Campbell, L.L.
1991-01-01
The US Nuclear Regulatory Commission (NRC) recently conducted a series of on-site assessments at selected nuclear plants to review improvements that the licenses had made to their procurement and dedication activities. The assessments included an evaluation of the progress made by licensees to strengthen their commercial-grade dedication programs to comply with 10CRF50, Appendix B, and to implement the comprehensive procurement improvements suggested in Nuclear Management and Resource Council (NUMARC) publication 901-3. This paper discusses the overall purpose of the assessments, procurement areas assessed, major strengths and weaknesses identified in licensee procurement programs, and the NRC's perspective of the industry's responsemore » to NUMARC procurement initiatives.« less
Modeling and simulation of satellite subsystems for end-to-end spacecraft modeling
NASA Astrophysics Data System (ADS)
Schum, William K.; Doolittle, Christina M.; Boyarko, George A.
2006-05-01
During the past ten years, the Air Force Research Laboratory (AFRL) has been simultaneously developing high-fidelity spacecraft payload models as well as a robust distributed simulation environment for modeling spacecraft subsystems. Much of this research has occurred in the Distributed Architecture Simulation Laboratory (DASL). AFRL developers working in the DASL have effectively combined satellite power, attitude pointing, and communication link analysis subsystem models with robust satellite sensor models to create a first-order end-to-end satellite simulation capability. The merging of these two simulation areas has advanced the field of spacecraft simulation, design, and analysis, and enabled more in-depth mission and satellite utility analyses. A core capability of the DASL is the support of a variety of modeling and analysis efforts, ranging from physics and engineering-level modeling to mission and campaign-level analysis. The flexibility and agility of this simulation architecture will be used to support space mission analysis, military utility analysis, and various integrated exercises with other military and space organizations via direct integration, or through DOD standards such as Distributed Interaction Simulation. This paper discusses the results and lessons learned in modeling satellite communication link analysis, power, and attitude control subsystems for an end-to-end satellite simulation. It also discusses how these spacecraft subsystem simulations feed into and support military utility and space mission analyses.
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
41 CFR 101-26.602-4 - Procurement of coal.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...
Greening Operations Management: An Online Sustainable Procurement Course for Practitioners
ERIC Educational Resources Information Center
Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian
2009-01-01
In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…
Code of Federal Regulations, 2010 CFR
2010-01-01
... unrestricted procurement for Certificate of Competency purposes? 121.409 Section 121.409 Business Credit and... an unrestricted procurement for Certificate of Competency purposes? For the purpose of receiving a Certificate of Competency in an unrestricted procurement, the applicable size standard is that corresponding...
The NGST Science Instrument Procurement Plan
NASA Astrophysics Data System (ADS)
Greenhouse, M. A.; NGST Project Office Team
1998-12-01
We display the top level plan for procurement of science instruments for NGST. The procurement process and time line schedule leading to a NASA AO solicitation for flight instruments is presented and discussed. This procurement schedule includes important milestones that will be reached during 1999 and that are of potential interest to NGST instrument offerors.
Code of Federal Regulations, 2014 CFR
2014-01-01
... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...
22 CFR 208.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
22 CFR 208.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
22 CFR 1508.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Are any procurement contracts included as... contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency; but (2) Do include some procurement contracts...
5 CFR 919.220 - Are any procurement contracts included as covered transactions?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Are any procurement contracts included as...) Covered Transactions § 919.220 Are any procurement contracts included as covered transactions? (a) Covered transactions under this part— (1) Do not include any procurement contracts awarded directly by a Federal agency...
A Blueprint for Effective and Adaptable School District Procurement
ERIC Educational Resources Information Center
Maas, Tricia; Lake, Robin
2015-01-01
In public education, procurement reform has been all but ignored in policy discussions and procurement policies have remained virtually untouched. But the high price of ignoring procurement is becoming clear to people trying to reform education on the ground. Often involving long, cumbersome processes and risk-averse central office cultures,…
eProcurement: The Technology of Smart Shopping
ERIC Educational Resources Information Center
Briggs, Linda L.
2006-01-01
This article talks about eProcurement and examines why school districts are so slow to make the transition. Despite the billions of dollars that flow from schools each year in procurement spending, most K-12 districts in the United States, especially smaller ones, persist in using paperbased procurement models in which supplies are identified in…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-13
... Guidance on Government-Wide Debarment and Suspension (Non-procurement) AGENCY: U.S. Agency for...-procurement), currently located in Part 208 of Title 22 of the Code of Federal Regulations (CFR), and [email protected] , fax (202) 567-4695 FOR FURTHER INFORMATION CONTACT: Melita E. Yearwood, Procurement Analyst...
48 CFR 217.172 - Multiyear contracts for supplies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of units to be procured through the contract; and (2) In the case of a contract for procurement of aircraft, the budget request includes full funding of procurement funds for production beyond advance procurement activities of aircraft units to be produced in the fiscal year covered by the budget. (d)(1) The...
Donor management parameters and organ yield: single center results.
Marshall, George Ryne; Mangus, Richard S; Powelson, John A; Fridell, Jonathan A; Kubal, Chandrashekhar A; Tector, A Joseph
2014-09-01
Management of organ donors in the intensive care unit is an emerging subject in critical care and transplantation. This study evaluates organ yield outcomes for a large number of patients managed by the Indiana Organ Procurement Organization. This is a retrospective review of intensive care unit records from 2008-2012. Donor demographic information and seven donor management parameters (DMP) were recorded at admission, consent, 12 h after consent, and before procurement. Three study groups were created: donors meeting 0-3, 4, or 5-7 DMP. Active donor Organ Procurement Organization management began at consent; so, data analysis focuses on the 12-h postconsent time point. Outcomes included organs transplanted per donor (OTPD) and transplantation of individual solid organs. Complete records for 499 patients were reviewed. Organ yield was 1415 organs of 3992 possible (35%). At 12 h, donors meeting more DMP had more OTPD: 2.2 (0-3) versus 3.0 (4) versus 3.5 (5-7) (P < 0.01). Aggregate DMP met was significantly associated with transplantation of every organ except intestine. Oxygen tension, vasopressor use, and central venous pressure were the most frequent independent predictors of organ usage. There were significantly more organs transplanted for donors meeting all three of these parameters (4.5 versus 2.7, P < 0.01). Initial DMP met does not appear to be a significant prognostic factor for OTPD. Aggregate DMP is associated with transplantation rates for most organs, with analysis of individual parameters suggesting that appropriate management of oxygenation, volume status, and vasopressor use could lead to more organs procured per donor. Copyright © 2014 Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
1973-01-01
A study was conducted to determine techniques for application to space communication. The subjects considered are as follows: (1) optical communication systems, (2) laser communications for data acquisition networks, (3) spacecraft data rate requirements, (4) telemetry, command, and data handling, (5) spacecraft tracking and data network antenna and preamplifier cost tradeoff study, and (6) spacecraft communication terminal evaluation.
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2013 CFR
2013-07-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2014 CFR
2014-01-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
41 CFR 105-72.505 - Cost and price analysis.
Code of Federal Regulations, 2012 CFR
2012-01-01
... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards... accomplished in various ways, including the comparison of price quotations submitted, market prices and similar...
Anker, Ashley E; Feeley, Thomas Hugh
2011-07-01
The present study provides an in-depth examination of the messages used by organ procurement coordinators (OPCs) in shaping familial requests for organ donation. OPCs (N = 102), recruited from a national sample of 16 organ procurement organizations, participated in a structured interview designed to uncover the communication strategies used in obtaining familial consent for donation. Analysis of interviews indicates OPCs' messages cover 4 domain areas. Specifically, OPCs report use of messages intended to (a) provide education, (b) discuss the benefits to donation, (c) learn about potential donor families, and (d) persuade families to engage in donation. Within the 4 domain areas, OPCs report use of 15 specific messages (e.g., "positively framing the donor," "social proof," "discuss the benefit of donation to grieving") in requesting consent. The present study provides a detailed examination of strategies and offers recommendations for using message strategies to explore the effectiveness of the consent process from the perspective of OPCs in approaching donor families.
Kim, Mi-Kyung
2009-01-01
We examine whether the current regulatory regime instituted in South Korea and the United States would have prevented Hwang's potential transgressions in oocyte procurement for somatic cell nuclear transfer, we compare the general aspects and oversight framework of the Bioethics and Biosafety Act in South Korea and the US National Academies' Guidelines for Human Embryonic Stem Cell Research, and apply the relevant provisions and recommendations to each transgression. We conclude that the Act would institute centralized oversight under governmental auspices while the Guidelines recommend politically-independent, decentralized oversight bodies including a special review body for human embryonic stem cell research at an institutional level and that the Guidelines would have provided more vigorous protection for the women who had undergone oocyte procurement for Hwang's research than the Act. We also suggest additional regulations to protect those who provide oocytes for research in South Korea.
NASA Astrophysics Data System (ADS)
Tabrizi, Babak H.; Ghaderi, Seyed Farid
2016-09-01
Simultaneous planning of project scheduling and material procurement can improve the project execution costs. Hence, the issue has been addressed here by a mixed-integer programming model. The proposed model facilitates the procurement decisions by accounting for a number of suppliers offering a distinctive discount formula from which to purchase the required materials. It is aimed at developing schedules with the best net present value regarding the obtained benefit and costs of the project execution. A genetic algorithm is applied to deal with the problem, in addition to a modified version equipped with a variable neighbourhood search. The underlying factors of the solution methods are calibrated by the Taguchi method to obtain robust solutions. The performance of the aforementioned methods is compared for different problem sizes, in which the utilized local search proved efficient. Finally, a sensitivity analysis is carried out to check the effect of inflation on the objective function value.
NASA Technical Reports Server (NTRS)
Kahn, R. D.; Thurman, S.; Edwards, C.
1994-01-01
Doppler and ranging measurements between spacecraft can be obtained only when the ratio of the total received signal power to noise power density (P(sub t)/N(sub 0)) at the receiving spacecraft is sufficiently large that reliable signal detection can be achieved within a reasonable time period. In this article, the requirement on P(sub t)/N(sub 0) for reliable carrier signal detection is calculated as a function of various system parameters, including characteristics of the spacecraft computing hardware and a priori uncertainty in spacecraft-spacecraft relative velocity and acceleration. Also calculated is the P(sub t)/N(sub 0) requirements for reliable detection of a ranging signal, consisting of a carrier with pseudonoise (PN) phase modulation. Once the P(sub t)/N(sub 0) requirement is determined, then for a given set of assumed spacecraft telecommunication characteristics (transmitted signal power, antenna gains, and receiver noise temperatures) it is possible to calculate the maximum range at which a carrier signal or ranging signal may be acquired. For example, if a Mars lander and a spacecraft approaching Mars are each equipped with 1-m-diameter antennas, the transmitted power is 5 W, and the receiver noise temperatures are 350 K, then S-band carrier signal acquisition can be achieved at ranges exceeding 10 million km. An error covariance analysis illustrates the utility of in situ Doppler and ranging measurements for Mars approach navigation. Covariance analysis results indicate that navigation accuracies of a few km can be achieved with either data type. The analysis also illustrates dependency of the achievable accuracy on the approach trajectory velocity.
NASA Technical Reports Server (NTRS)
Diaz-Aguado, Millan F.; VanOutryve, Cassandra; Ghassemiah, Shakib; Beasley, Christopher; Schooley, Aaron
2009-01-01
Small spacecraft have been increasing in popularity because of their low cost, short turnaround and relative efficiency. In the past, small spacecraft have been primarily used for technology demonstrations, but advances in technology have made the miniaturization of space science possible [1,2]. PharmaSat is a low cost, small three cube size spacecraft, with a biological experiment on board, built at NASA (National Aeronautics and Space Administration) Ames Research Center. The thermal design of small spacecraft presents challenges as their smaller surface areas translate into power and thermal constraints. The spacecraft is thermally designed to run colder in the Low Earth Orbit space environment, and heated to reach the temperatures required by the science payload. The limited power supply obtained from the solar panels on small surfaces creates a constraint in the power used to heat the payload to required temperatures. The pressurized payload is isolated with low thermally conductance paths from the large ambient temperature changes. The thermal design consists of different optical properties of section surfaces, Multi Layer Insulation (MLI), low thermal conductance materials, flexible heaters and thermal spreaders. The payload temperature is controlled with temperature sensors and flexible heaters. Finite Element Analysis (FEA) and testing were used to aid the thermal design of the spacecraft. Various tests were conducted to verify the thermal design. An infrared imager was used on the electronic boards to find large heat sources and eliminate any possible temperature runaways. The spacecraft was tested in a thermal vacuum chamber to optimize the thermal and power analysis and qualify the thermal design of the spacecraft for the mission.
Critical factors for sustainable food procurement in zoological collections.
Hanson, Jonathan H
2015-01-01
Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.
Ewen, Margaret; Al Sakit, Maisa; Saadeh, Rawan; Laing, Richard; Vialle-Valentin, Catherine; Seita, Akihiro; Bunders, Joske
2014-01-01
The United Nations Relief and Works Agency for Palestine Refugees in the Near East (UNRWA), the main primary healthcare provider for 4.9 million Palestinian refugees, spent USD18.3 million on essential medicines dispensed free-of-charge through clinics in five areas of operation ('fields'): Gaza, Jordan, Lebanon, Syria, and the West Bank (2010). Faced with budget contraints and an increasing demand for medicines to treat chronic conditions, the objective of our study was to assess UNRWA's medicine procurement prices to see if savings could be possible. In July 2011, data was collected from UNRWA headquarters in Jordan. Price analyses focused on the top 80 medicines by value, accounting for 93% of pharmaceutical expenditure from the General Fund, with comparisons to international, regional and national references. Prices were also compared for the few medicines procured both through UNRWA's central tender (centrally) and by the fields directly (locally). Central procurement prices did not differ markedly from reference prices: median ratios of UNRWA prices to Management Sciences for Health's International Drug Price Indicator Guide, Jordan's Joint Procurement Department, Gulf Cooperation Council, and IDA Foundation bulk packs were 0.99, 1.00, 0.98 and 1.12 respectively. Applying the lowest comparator price to five comparatively higher priced medicines would yield savings of USD1.4 million. Local procurements were generally less cost-effective than central tender procurement, with notable differences across fields and medicines. Overall, UNRWA's procurement prices were competitive despite the relatively small quantities procured. Regular monitoring of procurement prices and quantities is needed in order to make informed decisions. Our evaluation also underscores the heavy burden of antidiabetic medicines and antimicrobials on UNRWA procurement expenditure.
Shrestha, Mina; Moles, Rebekah; Ranjit, Eurek; Chaar, Betty
2018-01-01
Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines "the Basel Statements". We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors' prescriptions, which were heavily influenced by pharmaceutical companies' marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics.
Ranjit, Eurek
2018-01-01
Background Accessibility and affordability of evidence-based medicines are issues of global concern. For low-income countries like Nepal, it is crucial to have easy and reliable access to affordable, good-quality, evidence-based medicines, especially in the aftermath of natural or manmade disasters. Availability of affordable and evidence-based high quality medicines depends on the medicine procurement procedure, which makes it an important aspect of healthcare delivery. In this study, we aimed to investigate medicine procurement practices in hospital pharmacies of Nepal within the framework of International Pharmaceutical Federation [FIP] hospital pharmacy guidelines “the Basel Statements”. Method We conducted semi-structured interviews with hospital pharmacists or procurement officers in hospital pharmacies of four major regions in Nepal to explore procurement practices. Data were collected until saturation of themes, analysed using the framework approach, and organised around the statements within the procurement theme of the Basel Statements. Results Interviews conducted with 53 participants revealed that the procurement guidelines of the Basel Statements were adopted to a certain extent in hospital pharmacies of Nepal. It was found that the majority of hospital pharmacies in Nepal reported using an expensive direct-procurement model for purchasing medicines. Most had no formulary and procured medicines solely based on doctors’ prescriptions, which were heavily influenced by pharmaceutical companies’ marketing strategies. Whilst most procured only registered medicines, a minority reported purchasing unregistered medicines through unauthorised supply-chains. And although the majority of hospital pharmacies had some contingency plans for managing medicine shortages, a few had none. Conclusions Procurement guidelines of the Basel Statements were thus found to be partially adopted; however, there is room for improvement in current procurement practices in hospital pharmacies of Nepal. Adoption and regulation of national and international policies is recommended for enhancing medicine accessibility, as well as improving preparedness for health emergencies during natural disasters and health epidemics. PMID:29401474
Printed Spacecraft Separation System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holmans, Walter; Dehoff, Ryan
In this project Planetary Systems Corporation proposed utilizing additive manufacturing (3D printing) to manufacture a titanium spacecraft separation system for commercial and US government customers to realize a 90% reduction in the cost and energy. These savings were demonstrated via “printing-in” many of the parts and sub-assemblies into one part, thus greatly reducing the labor associated with design, procurement, assembly and calibration of mechanisms. Planetary Systems Corporation redesigned several of the components of the separation system based on additive manufacturing principles including geometric flexibility and the ability to fabricate complex designs, ability to combine multiple parts of an assembly intomore » a single component, and the ability to optimize design for specific mechanical property targets. Shock absorption was specifically targeted and requirements were established to attenuate damage to the Lightband system from shock of initiation. Planetary Systems Corporation redesigned components based on these requirements and sent the designs to Oak Ridge National Laboratory to be printed. ORNL printed the parts using the Arcam electron beam melting technology based on the desire for the parts to be fabricated from Ti-6Al-4V based on the weight and mechanical performance of the material. A second set of components was fabricated from stainless steel material on the Renishaw laser powder bed technology due to the improved geometric accuracy, surface finish, and wear resistance of the material. Planetary Systems Corporation evaluated these components and determined that 3D printing is potentially a viable method for achieving significant cost and savings metrics.« less
NASA Technical Reports Server (NTRS)
Wright, Nathaniel, Jr.
2000-01-01
The evolution of satellite operations over the last 40 years has drastically changed. October 4, 1957 (during the cold war) the Soviet Union launched the world's first spacecraft into orbit. The Sputnik satellite orbited Earth for three months and catapulted the United States into a race for dominance in space. A year after Sputnik, President Dwight Eisenhower formed the National Space and Aeronautics Administration (NASA). With a team of scientists and engineers, NASA successfully launched Explorer 1, the first US satellite to orbit Earth. During these early years, massive amounts of ground support equipment and operators were required to successfully operate spacecraft vehicles. Today, budget reductions and technological advances have forced new approaches to spacecraft operations. These approaches require increasingly complex, on board spacecraft systems, that enable autonomous operations, resulting in more cost-effective mission operations. NASA's Goddard Space Flight Center, considered world class in satellite development and operations, has developed and operated over 200 satellites during its 40 years of existence. NASA Goddard is adopting several new millennium initiatives that lower operational costs through the spacecraft autonomy and automation. This paper examines NASA's approach to spacecraft autonomy and ground system automation through a comparative analysis of satellite missions for Hubble Space Telescope-HST, Near Earth Asteroid Rendezvous-NEAR, and Solar Heliospheric Observatory-SoHO, with emphasis on cost reduction methods, risk analysis and anomalies and strategies employed for mitigating risk.
NASA Astrophysics Data System (ADS)
Ivashkin, V. V.; Krylov, I. V.
2014-03-01
The problem of optimization of a spacecraft transfer to the Apophis asteroid is investigated. The scheme of transfer under analysis includes a geocentric stage of boosting the spacecraft with high thrust, a heliocentric stage of control by a low thrust engine, and a stage of deceleration with injection to an orbit of the asteroid's satellite. In doing this, the problem of optimal control is solved for cases of ideal and piecewise-constant low thrust, and the optimal magnitude and direction of spacecraft's hyperbolic velocity "at infinity" during departure from the Earth are determined. The spacecraft trajectories are found based on a specially developed comprehensive method of optimization. This method combines the method of dynamic programming at the first stage of analysis and the Pontryagin maximum principle at the concluding stage, together with the parameter continuation method. The estimates are obtained for the spacecraft's final mass and for the payload mass that can be delivered to the asteroid using the Soyuz-Fregat carrier launcher.
Benchmarking organ procurement organizations: a national study.
Ozcan, Y A; Begun, J W; McKinney, M M
1999-01-01
OBJECTIVE: An exploratory examination of the technical efficiency of organ procurement organizations (OPOs) relative to optimal patterns of production in the population of OPOs in the United States. DATA SOURCES: A composite data set with the OPO as the unit of analysis, constructed from a 1995 national survey of OPOs (n = 64), plus secondary data from the Association of Organ Procurement Organizations and the United Network for Organ Sharing. STUDY DESIGN: The study uses data envelopment analysis (DEA) to evaluate the technical efficiency of all OPOs. PRINCIPAL FINDINGS: Overall, six of the 22 larger OPOs (27 percent) are classified as inefficient, while 23 of the 42 smaller OPOs (55 percent) are classified as inefficient. Efficient OPOs recover significantly more kidneys and extrarenal organs; have higher operating expenses; and have more referrals, donors, extrarenal transplants, and kidney transplants. The quantities of hospital development personnel and other personnel, and formalization of hospital development activities in both small and large OPOs, do not significantly differ. CONCLUSIONS: Indications that larger OPOs are able to operate more efficiently relative to their peers suggest that smaller OPOs are more likely to benefit from technical assistance. More detailed information on the activities of OPO staff would help pinpoint activities that can increase OPO efficiency and referrals, and potentially improve outcomes for large numbers of patients awaiting transplants. PMID:10536974
Engineering design, stress and thermal analysis, and documentation for SATS program
NASA Technical Reports Server (NTRS)
1973-01-01
An in-depth analysis and mechanical design of the solar array stowage and deployment arrangements for use in Small Applications Technology Satellite spacecraft is presented. Alternate approaches for the major elements of work are developed and evaluated. Elements include array stowage and deployment arrangements, the spacecraft and array behavior in the spacecraft despin mode, and the design of the main hinge and segment hinge assemblies. Feasibility calculations are performed and the preferred approach is identified.
Scientific Analysis of Data for the ISTP/SOLARMAX Programs
NASA Technical Reports Server (NTRS)
Lazarus, Alan J.
2001-01-01
This Grant supplemented our work on data analysis from the Wind spacecraft which was one of the ISTRIA fleet of spacecraft. It was targeted at observations related to the time of solar maximum in 2000. The work we proposed to do under this grant included comparison of solar wind parameters obtained from different spacecraft in order to establish correlation lengths appropriate to the solar wind and also to compare parameters to explore solar cycle effects.
NASA Technical Reports Server (NTRS)
Conway, B. A.
1974-01-01
Astronaut crew motions can produce some of the largest disturbances acting on a manned spacecraft which can affect vehicle attitude and pointing. Skylab Experiment T-013 was developed to investigate the magnitude and effects of some of these disturbances on the Skylab spacecraft. The methods and techniques used to carry out this experiment are discussed, and preliminary results of data analysis presented. Initial findings indicate that forces on the order of 300 N were exerted during vigorous soaring activities, and that certain experiment activities produced spacecraft angular rate excursions 0.03 to 0.07 deg/sec. Results of Experiment T-013 will be incorporated into mathematical models of crew-motion disturbances, and are expected to be of significant aid in the sizing, design, and analysis of stabilization and control systems for future manned spacecraft.
The Hera Saturn Entry Probe Mission: a Proposal in Response to the ESA M5 Call
NASA Astrophysics Data System (ADS)
Mousis, Olivier; Atkinson, David; Amato, Michael; Aslam, Shahid; Atreya, Sushil; Blanc, Michel; Bolton, Scott; Brugger, Bastien; Calcutt, Simon; Cavalié, Thibault; Charnoz, Sébastien; Coustenis, Athena; Deleuil, Magali; Dobrijevic, Michel; Ferri, Francesca; Fletcher, Leigh; Gautier, Daniel; Guillot, Tristan; Hartogh, Paul; Holland, Andrew
2017-04-01
The Hera Saturn entry probe mission is proposed as an ESA M-class mission to be piggybacked on a NASA spacecraft sent to or past the Saturn system. Hera consists of an atmospheric probe built by ESA and released into the atmosphere of Saturn by its NASA companion Saturn Carrier-Relay spacecraft. Hera will perform in situ measurements of the chemical and isotopic composition as well as the structure and dynamics of Saturn's atmosphere using a single probe, with the goal of improving our understanding of the origin, formation, and evolution of Saturn, the giant planets and their satellite systems, with extrapolation to extrasolar planets. Hera will probe well into and possibly beneath the cloud-forming region of the troposphere, below the region accessible to remote sensing, to locations where certain cosmogenically abundant species are expected to be well mixed. The Hera probe will be designed from ESA elements with possible contributions from NASA, and the Saturn/Carrier-Relay Spacecraft will be supplied by NASA through its selection via the New Frontier 2016 call or in the form of a flagship mission selected by the NASA "Roadmaps to Ocean Worlds" (ROW) program. The Hera probe will be powered by batteries, and we therefore anticipate only one major subsystems to be possibly supplied by the United States, either by direct procurement by ESA or by contribution from NASA: the thermal protection system of the probe. Following the highly successful example of the Cassini-Huygens mission, Hera will carry European and American instruments, with scientists and engineers from both agencies and many affiliates participating in all aspects of mission development and implementation. A Saturn probe is one of the six identified desired themes by the Planetary Science Decadal Survey committee on the NASA New Frontier's list, providing additional indication that a Saturn probe is of extremely high interest and a very high priority for the international community.
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement... contracts will not adequately serve the end-use purpose. GSA will notify the requesting agency in writing of... in which the requisitioner is located. GSA will either arrange for procurement of the items or...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 41 Public Contracts and Property Management 2 2014-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 41 Public Contracts and Property Management 2 2013-07-01 2012-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 41 Public Contracts and Property Management 2 2012-07-01 2012-07-01 false Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-3 - Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of gasoline... § 101-26.602-3 Procurement of gasoline, fuel oil (diesel and burner), kerosene, and solvents. (a... capability to procure locally. Item Minimum annual requirement (gallons) Gasoline 10,000 Burner fuel oil 10...
41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...
ERIC Educational Resources Information Center
Federal Library Committee, Washington, DC.
The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…
Determinants of Non-Compliance of Public Procurement Regulations in Kenyan Secondary Schools
ERIC Educational Resources Information Center
Migosi, Joash; Ombuki, Charles; Ombuki, Kennedy N.; Evusa, Zablon
2013-01-01
Kenya's public procurement and disposal Act of 2005 sets out clear rules and procedures for public procurement entities to follow; however this does not seem to be the case. This study sought to examine determinants of Non-compliance to the Public Procurement Regulations in Kenyan Secondary Schools. The study adopted a descriptive survey research.…
41 CFR 101-26.602-5 - Procurement of natural gas from the wellhead and other supply sources.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-26.602-5 Procurement of natural gas from the wellhead and other supply sources. (a) Natural gas... natural gas procurements at a facility exceed 20,000 mcf annually and the facility can accept... natural gas shall be forwarded to the Public Utilities Division (PPU), Office of Procurement, General...
1986-06-01
financial reporting in Republic of Korea Army (ROKA) procurement. A discussion of the nature of the ROKA procurement system and two alternatives to historical cost financial statements are presented. The concepts, methods and procedures of the historical cost/constant dollars financial statements are described. The proposal for current cost/constant dollars financial statements is presented and emphasis is given to the description of four problems in existing ROKA procurement due to using inadequate accounting information. Keywords: Cost accounting, Procurement, Current
BIM-Based E-Procurement: An Innovative Approach to Construction E-Procurement
2015-01-01
This paper presents an innovative approach to e-procurement in construction, which uses building information models (BIM) to support the construction procurement process. The result is an integrated and electronic instrument connected to a rich knowledge base capable of advanced operations and able to strengthen transaction relationships and collaboration throughout the supply chain. The BIM-based e-procurement prototype has been developed using distinct existing electronic solutions and an IFC server and was tested in a pilot case study, which supported further discussions of the results of the research. PMID:26090518
Enhanced Formation Flying for the Earth Observing-1 (EO-1) New Millennium Mission
NASA Technical Reports Server (NTRS)
Folta, David; Quinn, David
1997-01-01
With scientific objectives for Earth observation programs becoming more ambitious and spacecraft becoming more autonomous, the need for new technical approaches on the feasibility of achieving and maintaining formations of spacecraft has come to the forefront. The trend to develop small low cost spacecraft has led many scientists to recognize the advantage of flying several spacecraft in formation, an example of which is shown in the figure below, to achieve the correlated instrument measurements formerly possible only by flying many instruments on a single large platform. Yet, formation flying imposes additional complications on orbit maintenance, especially when each spacecraft has its own orbit requirements. However, advances in automation proposed by GSFC Codes 550 and 712 allow more of the burden in maneuver planning and execution to be placed onboard the spacecraft, mitigating some of the associated operational concerns. The purpose of this analysis is to develop the fundamentals of formation flying mechanics, concepts for understanding the relative motion of free flying spacecraft, and an operational control theory for formation maintenance of the Earth Observing-1 (EO-l) spacecraft that is part of the New Millennium. Results of this development can be used to determine the appropriateness of formation flying for a particular case as well as the operational impacts. Applications to the Mission to Planet Earth (MTPE) Earth Observing System (EOS) and New Millennium (NM) were highly considered in analysis and applications. This paper presents the proposed methods for the guidance and control of the EO-1 spacecraft to formation fly with the Landsat-7 spacecraft using an autonomous closed loop three axis navigation control, GPS, and Cross link navigation support. Simulation results using various fidelity levels of modeling, algorithms developed and implemented in MATLAB, and autonomous 'fuzzy logic' control using AutoCon will be presented. The results of these analysis on the ability to meet mission and formation flying requirements will be presented.
Spacecraft Jitter Attenuation Using Embedded Piezoelectric Actuators
NASA Technical Reports Server (NTRS)
Belvin, W. Keith
1995-01-01
Remote sensing from spacecraft requires precise pointing of measurement devices in order to achieve adequate spatial resolution. Unfortunately, various spacecraft disturbances induce vibrational jitter in the remote sensing instruments. The NASA Langley Research Center has performed analysis, simulations, and ground tests to identify the more promising technologies for minimizing spacecraft pointing jitter. These studies have shown that the use of smart materials to reduce spacecraft jitter is an excellent match between a maturing technology and an operational need. This paper describes the use of embedding piezoelectric actuators for vibration control and payload isolation. In addition, recent advances in modeling, simulation, and testing of spacecraft pointing jitter are discussed.
Spacecraft Systems Engineering, 3rd Edition
NASA Astrophysics Data System (ADS)
Fortescue, Peter; Stark, John; Swinerd, Graham
2003-03-01
Following on from the hugely successful previous editions, the third edition of Spacecraft Systems Engineering incorporates the most recent technological advances in spacecraft and satellite engineering. With emphasis on recent developments in space activities, this new edition has been completely revised. Every chapter has been updated and rewritten by an expert engineer in the field, with emphasis on the bus rather than the payload. Encompassing the fundamentals of spacecraft engineering, the book begins with front-end system-level issues, such as environment, mission analysis and system engineering, and progresses to a detailed examination of subsystem elements which represent the core of spacecraft design - mechanical, electrical, propulsion, thermal, control etc. This quantitative treatment is supplemented by an appreciation of the interactions between the elements, which deeply influence the process of spacecraft systems design. In particular the revised text includes * A new chapter on small satellites engineering and applications which has been contributed by two internationally-recognised experts, with insights into small satellite systems engineering. * Additions to the mission analysis chapter, treating issues of aero-manouevring, constellation design and small body missions. In summary, this is an outstanding textbook for aerospace engineering and design students, and offers essential reading for spacecraft engineers, designers and research scientists. The comprehensive approach provides an invaluable resource to spacecraft manufacturers and agencies across the world.
A new funding opportunity in support of the National Cancer Institute’s Clinical Proteomic Tumor Analysis Consortium (CPTAC) seeks to prospectively procure tumor samples, collected for proteomics investigation.
Trippoli, Sabrina; Caccese, Erminia; Marinai, Claudio; Messori, Andrea
2018-03-01
In the acute ischemic stroke, endovascular devices have shown promising clinical results and are also likely to represent value for money, as several modeling studies have shown. Pharmacoeconomic evaluations in this field, however, have little impact on the procurement of these devices. The present study explored how complex pharmacoeconomic models that evaluate effectiveness and cost can be incorporated into the in-hospital procurement of thrombectomy devices. As regards clinical modeling, we extracted outcomes at three months from randomized trials conducted for four thrombectomy devices, and we projected long-term results using standard Markov modeling. In estimating QALYs, the same model was run for the four devices. As regards economic modeling, we firstly estimated for each device the net monetary benefit (NMB) per patient (threshold = $60,000 per QALY); then, we simulated a competitive tender across the four products by determining the tender-based score (on a 0-to-100 scale). Prices of individual devices were obtained from manufacturers. Extensive sensitivity testing was applied to our analyses. For the four devices (Solitaire, Trevo, Penumbra, Solumbra), QALYs were 1.86, 1.52, 1,79, 1.35, NMB was $101,824, $83,546, $101,923, $69,440, and tender-based scores were 99.70, 43.43, 100, 0, respectively. Sensitivity analysis confirmed findings from base-case. Our results indicate that, in the field of thrombectomy devices, incorporating the typical tools of cost-effectiveness into the processes of tenders and procurement is feasible. Bridging the methodology of cost-effectiveness with the every-day practice of in-hospital procurement can contribute to maximizing the health returns that are generated by in-hospital expenditures for medical devices. Copyright © 2018 Elsevier B.V. All rights reserved.
The procurement of NHS dental services--a guide.
Jones, C L; Rooney, E
2009-05-23
This paper gives an overview of the strategic background for procurement of NHS primary care dental services and an outline of the processes involved in procurement. The main aim is to bring procurement to the attention of a wider audience of dental practitioners and provide advice for potential primary care dental service providers. The move towards local procurement of healthcare services, including primary care dental services, has been shaped by a number of strategic Government publications and is supported by law. In line with other public bodies, the NHS is subject to the European Union and international rules regarding procurement and awarding contracts. Primary Care Trust (PCT) Dental Service Commissioners have to ensure that their procurement strategy is transparent and non-discriminatory so that all providers have an equal opportunity to compete for contracts. In order to successfully tender for future service provision contracts, dental practitioners not only need to be aware of the process of procurement and its associated legal requirements. It is also important that they have a grasp of the expectations of PCTs. Commissioning services via procurement is set to become more commonplace and it is likely, in time, that competition for some contracts will increase in intensity. The importance of researching proposals thoroughly and adopting a professional, businesslike approach to tendering cannot be understated as this maximises chance of success in the new commissioning environment.
Decision Analysis Techniques for Adult Learners: Application to Leadership
ERIC Educational Resources Information Center
Toosi, Farah
2017-01-01
Most decision analysis techniques are not taught at higher education institutions. Leaders, project managers and procurement agents in industry have strong technical knowledge, and it is crucial for them to apply this knowledge at the right time to make critical decisions. There are uncertainties, problems, and risks involved in business…
78 FR 7821 - Public Availability of Railroad Retirement Board FY 2012 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-04
.../files/omb/procurement/memo/service-contract-inventory-guidance.pdf . The Railroad Retirement Board has... analysis of its selected special interest functions from the FY 2012 Service Contract inventory, and finally (4) the analysis report on its FY 2011 Service Contract Inventory special interest functions, on...
Berkeley Lab - Materials Sciences Division
MSD Support Human Resources Facilities & Space Planning Procurement and Property Proposals & Planning Procurement and Property Proposals & Finance Templates Travel Procurement and Property This
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
48 CFR 219.201 - General policy.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) procurement center representative. If an SBA procurement center representative is not assigned, see FAR 19.402... (Acquisition, Technology, and Logistics), simultaneously with submittal to the Office of Federal Procurement...
7 CFR 226.22 - Procurement standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... affirmative action in support of women's business enterprises. (g) All procurement transactions, regardless of... history of a procurement. These records shall include, but are not necessarily limited to information...
24 CFR 943.150 - What procurement standards apply to a PHA's joint venture partner?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false What procurement standards apply to... Subsidiaries, Affiliates, Joint Ventures in Public Housing § 943.150 What procurement standards apply to a PHA..., accordingly, is not required to comply with part 84 or part 85 of this title in its procurement of goods and...
NASA Astrophysics Data System (ADS)
Morel de Westgaver, Eric; van Beekhuizen, Pieter; Fiorilli, Stefano M.
2007-02-01
Space projects are marked by their high technologies and their lengthy development and operations. The procurement process is a critical element that must adapt to a changing industrial landscape and new methods and tools, such as electronic procurement. ESA will host an international symposium in May [2007] to bring all the major players together.
The model and moral justification for organ procurement in Japan.
Bagheri, Alireza; Shoji, Shin'ichi
2005-01-01
Organ replacement therapy is a part of medical practice in today's world and many countries have adopted the required guidelines and regulations. Establishing the basis on which organs can be removed, is still one of the most controversial issues of health policy making in the debate. The critical disparity between supply and demand in organ replacement therapy, even with the existence of social acceptance and organ transplantation law, turns attention towards the importance of an appropriate model of organ procurement. This model should be able to expand the donor pool and increase the organ retrieval rate by converting potential donors to actual ones. In Japan the organ transplantation law which was enacted in 1997 allows organ procurement from brain death as well as non-heart beating cadavers according to restricted conditions. One such condition includes the necessity of both the donor's and the family's written consent. Under current organ procurement policy, organs from only 29 brain death cases have been so far procured. In this paper after examining the current organ procurement system in Japan and the moral justifications behind different organ procurement models we conclude that the Japanese system does not clearly fall into one of the popular organ procurement models.
Goddard Space Flight Center solar array missions, requirements and directions
NASA Technical Reports Server (NTRS)
Gaddy, Edward; Day, John
1994-01-01
The Goddard Space Flight Center (GSFC) develops and operates a wide variety of spacecraft for conducting NASA's communications, space science, and earth science missions. Some are 'in house' spacecraft for which the GSFC builds the spacecraft and performs all solar array design, analysis, integration, and test. Others are 'out of house' spacecraft for which an aerospace contractor builds the spacecraft and develops the solar array under direction from GSFC. The experience of developing flight solar arrays for numerous GSFC 'in house' and 'out of house' spacecraft has resulted in an understanding of solar array requirements for many different applications. This presentation will review those solar array requirements that are common to most GSFC spacecraft. Solar array technologies will be discussed that are currently under development and that could be useful to future GSFC spacecraft.
Cost effective nuclear commercial grade dedication
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maletz, J.J.; Marston, M.J.
1991-01-01
This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less
Distributed Impact Detector System (DIDS) Health Monitoring System Evaluation
NASA Technical Reports Server (NTRS)
Prosser, William H.; Madaras, Eric I.
2010-01-01
Damage due to impacts from micrometeoroids and orbital debris is one of the most significant on-orbit hazards for spacecraft. Impacts to thermal protection systems must be detected and the damage evaluated to determine if repairs are needed to allow safe re-entry. To address this issue for the International Space Station Program, Langley Research Center and Johnson Space Center technologists have been working to develop and implement advanced methods for detecting impacts and resultant leaks. LaRC funded a Small Business Innovative Research contract to Invocon, Inc. to develop special wireless sensor systems that are compact, light weight, and have long battery lifetimes to enable applications to long duration space structures. These sensor systems are known as distributed impact detection systems (DIDS). In an assessment, the NASA Engineering and Safety Center procured two prototype DIDS sensor units to evaluate their capabilities in laboratory testing and field testing in an ISS Node 1 structural test article. This document contains the findings of the assessment.
Low cost Ku-band earth terminals for voice/data/facsimile
NASA Technical Reports Server (NTRS)
Kelley, R. L.
1977-01-01
A Ku-band satellite earth terminal capable of providing two way voice/facsimile teleconferencing, 128 Kbps data, telephone, and high-speed imagery services is proposed. Optimized terminal cost and configuration are presented as a function of FDMA and TDMA approaches to multiple access. The entire terminal from the antenna to microphones, speakers and facsimile equipment is considered. Component cost versus performance has been projected as a function of size of the procurement and predicted hardware innovations and production techniques through 1985. The lowest cost combinations of components has been determined in a computer optimization algorithm. The system requirements including terminal EIRP and G/T, satellite size, power per spacecraft transponder, satellite antenna characteristics, and link propagation outage were selected using a computerized system cost/performance optimization algorithm. System cost and terminal cost and performance requirements are presented as a function of the size of a nationwide U.S. network. Service costs are compared with typical conference travel costs to show the viability of the proposed terminal.
22 CFR 201.22 - Procurement under public sector procedures.
Code of Federal Regulations, 2010 CFR
2010-04-01
... procurement. Purchasing by brand or trade name or by a restrictive specification (proprietary procurement) may... by operating personnel, can be achieved through standardizing on a particular brand; (2...
Code of Federal Regulations, 2012 CFR
2012-04-01
.... (1) For purposes of this section, the term procurement means the process which leads to any award of... shall maintain records sufficient to detail the significant history of a procurement. These records...
A Prototyping Effort for the Integrated Spacecraft Analysis System
NASA Technical Reports Server (NTRS)
Wong, Raymond; Tung, Yu-Wen; Maldague, Pierre
2011-01-01
Computer modeling and simulation has recently become an essential technique for predicting and validating spacecraft performance. However, most computer models only examine spacecraft subsystems, and the independent nature of the models creates integration problems, which lowers the possibilities of simulating a spacecraft as an integrated unit despite a desire for this type of analysis. A new project called Integrated Spacecraft Analysis was proposed to serve as a framework for an integrated simulation environment. The project is still in its infancy, but a software prototype would help future developers assess design issues. The prototype explores a service oriented design paradigm that theoretically allows programs written in different languages to communicate with one another. It includes creating a uniform interface to the SPICE libraries such that different in-house tools like APGEN or SEQGEN can exchange information with it without much change. Service orientation may result in a slower system as compared to a single application, and more research needs to be done on the different available technologies, but a service oriented approach could increase long term maintainability and extensibility.
Survey of optimization techniques for nonlinear spacecraft trajectory searches
NASA Technical Reports Server (NTRS)
Wang, Tseng-Chan; Stanford, Richard H.; Sunseri, Richard F.; Breckheimer, Peter J.
1988-01-01
Mathematical analysis of the optimal search of a nonlinear spacecraft trajectory to arrive at a set of desired targets is presented. A high precision integrated trajectory program and several optimization software libraries are used to search for a converged nonlinear spacecraft trajectory. Several examples for the Galileo Jupiter Orbiter and the Ocean Topography Experiment (TOPEX) are presented that illustrate a variety of the optimization methods used in nonlinear spacecraft trajectory searches.
41 CFR 101-26.501-3 - Consolidated purchase program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT..., purchased in the aggregate by group to the extent practical. These procurements are designed to obtain the...
13 CFR 125.15 - What requirements must an SDVO SBC meet to submit an offer on a contract?
Code of Federal Regulations, 2010 CFR
2010-01-01
... corresponding to the NAICS code assigned to the contract, provided: (A) For a procurement having a revenue-based... to the contract; or (B) For a procurement having an employee-based size standard, the procurement... specific contract: (1) It is an SDVO SBC; (2) It is small under the NAICS code assigned to the procurement...
PLATSIM: An efficient linear simulation and analysis package for large-order flexible systems
NASA Technical Reports Server (NTRS)
Maghami, Periman; Kenny, Sean P.; Giesy, Daniel P.
1995-01-01
PLATSIM is a software package designed to provide efficient time and frequency domain analysis of large-order generic space platforms implemented with any linear time-invariant control system. Time domain analysis provides simulations of the overall spacecraft response levels due to either onboard or external disturbances. The time domain results can then be processed by the jitter analysis module to assess the spacecraft's pointing performance in a computationally efficient manner. The resulting jitter analysis algorithms have produced an increase in speed of several orders of magnitude over the brute force approach of sweeping minima and maxima. Frequency domain analysis produces frequency response functions for uncontrolled and controlled platform configurations. The latter represents an enabling technology for large-order flexible systems. PLATSIM uses a sparse matrix formulation for the spacecraft dynamics model which makes both the time and frequency domain operations quite efficient, particularly when a large number of modes are required to capture the true dynamics of the spacecraft. The package is written in MATLAB script language. A graphical user interface (GUI) is included in the PLATSIM software package. This GUI uses MATLAB's Handle graphics to provide a convenient way for setting simulation and analysis parameters.
Alaska Department of Labor Administrative Services Division
Sections Fiscal Research & Analysis Procurement Data Processing Budget Links State Employee Directory FY 2019 DOLWD Budget (Proposed) FY 2018 DOLWD Budget (Enacted) FY 2018 Indirect Cost Proposal FY 2016
17 CFR 200.13 - Executive Director.
Code of Federal Regulations, 2010 CFR
2010-04-01
... AND ETHICS; AND INFORMATION AND REQUESTS Organization and Program Management General Organization... procurement regulations, enters into contracts, designates contracting officers, and makes procurement...-specific application of performance measures, procurement reforms, personnel reductions, financial...
Automating Trend Analysis for Spacecraft Constellations
NASA Technical Reports Server (NTRS)
Davis, George; Cooter, Miranda; Updike, Clark; Carey, Everett; Mackey, Jennifer; Rykowski, Timothy; Powers, Edward I. (Technical Monitor)
2001-01-01
Spacecraft trend analysis is a vital mission operations function performed by satellite controllers and engineers, who perform detailed analyses of engineering telemetry data to diagnose subsystem faults and to detect trends that may potentially lead to degraded subsystem performance or failure in the future. It is this latter function that is of greatest importance, for careful trending can often predict or detect events that may lead to a spacecraft's entry into safe-hold. Early prediction and detection of such events could result in the avoidance of, or rapid return to service from, spacecraft safing, which not only results in reduced recovery costs but also in a higher overall level of service for the satellite system. Contemporary spacecraft trending activities are manually intensive and are primarily performed diagnostically after a fault occurs, rather than proactively to predict its occurrence. They also tend to rely on information systems and software that are oudated when compared to current technologies. When coupled with the fact that flight operations teams often have limited resources, proactive trending opportunities are limited, and detailed trend analysis is often reserved for critical responses to safe holds or other on-orbit events such as maneuvers. While the contemporary trend analysis approach has sufficed for current single-spacecraft operations, it will be unfeasible for NASA's planned and proposed space science constellations. Missions such as the Dynamics, Reconnection and Configuration Observatory (DRACO), for example, are planning to launch as many as 100 'nanospacecraft' to form a homogenous constellation. A simple extrapolation of resources and manpower based on single-spacecraft operations suggests that trending for such a large spacecraft fleet will be unmanageable, unwieldy, and cost-prohibitive. It is therefore imperative that an approach to automating the spacecraft trend analysis function be studied, developed, and applied to missions such as DRACO with the intent that mission operations costs be significantly reduced. The goal of the Constellation Spacecraft Trend Analysis Toolkit (CSTAT) project is to serve as the pathfinder for a fully automated trending system to support spacecraft constellations. The development approach to be taken is evolutionary. In the first year of the project, the intent is to significantly advance the state of the art in current trending systems through improved functionality and increased automation. In the second year, the intent is to add an expert system shell, likely through the adaptation of an existing commercial-off-the-shelf (COTS) or government-off-the-shelf (GOTS) tool to implement some level of the trending intelligence that humans currently provide in manual operations. In the third year, the intent is to infuse the resulting technology into a near-term constellation or formation-flying mission to test it and gain experience in automated trending. The lessons learned from the real missions operations experience will then be used to improve the system, and to ultimately incorporate it into a fully autonomous, closed-loop mission operations system that is truly capable of supporting large constellations. In this paper, the process of automating trend analysis for spacecraft constellations will be addressed. First, the results of a survey on automation in spacecraft mission operations in general, and in trending systems in particular will be presented to provide an overview of the current state of the art. Next, a rule-based model for implementing intelligent spacecraft subsystem trending will be then presented, followed by a survey of existing COTS/GOTS tools that could be adapted for implementing such a model. The baseline design and architecture of the CSTAT system will be presented. Finally, some results obtained from initial software tests and demonstrations will be presented.
Systems design and comparative analysis of large antenna concepts
NASA Technical Reports Server (NTRS)
Garrett, L. B.; Ferebee, M. J., Jr.
1983-01-01
Conceptual designs are evaluated and comparative analyses conducted for several large antenna spacecraft for Land Mobile Satellite System (LMSS) communications missions. Structural configurations include trusses, hoop and column and radial rib. The study was conducted using the Interactive Design and Evaluation of Advanced Spacecraft (IDEAS) system. The current capabilities, development status, and near-term plans for the IDEAS system are reviewed. Overall capabilities are highlighted. IDEAS is an integrated system of computer-aided design and analysis software used to rapidly evaluate system concepts and technology needs for future advanced spacecraft such as large antennas, platforms, and space stations. The system was developed at Langley to meet a need for rapid, cost-effective, labor-saving approaches to the design and analysis of numerous missions and total spacecraft system options under consideration. IDEAS consists of about 40 technical modules efficient executive, data-base and file management software, and interactive graphics display capabilities.
Conceptual spacecraft systems design and synthesis
NASA Technical Reports Server (NTRS)
Wright, R. L.; Deryder, D. D.; Ferebee, M. J., Jr.
1984-01-01
An interactive systems design and synthesis is performed on future spacecraft concepts using the Interactive Design and Evaluation of Advanced Systems (IDEAS) computer-aided design and analysis system. The capabilities and advantages of the systems-oriented interactive computer-aided design and analysis system are described. The synthesis of both large antenna and space station concepts, and space station evolutionary growth designs is demonstrated. The IDEAS program provides the user with both an interactive graphics and an interactive computing capability which consists of over 40 multidisciplinary synthesis and analysis modules. Thus, the user can create, analyze, and conduct parametric studies and modify earth-orbiting spacecraft designs (space stations, large antennas or platforms, and technologically advanced spacecraft) at an interactive terminal with relative ease. The IDEAS approach is useful during the conceptual design phase of advanced space missions when a multiplicity of parameters and concepts must be analyzed and evaluated in a cost-effective and timely manner.
Control of flexible structures
NASA Technical Reports Server (NTRS)
Russell, R. A.
1985-01-01
The requirements for future space missions indicate that many of these spacecraft will be large, flexible, and in some applications, require precision geometries. A technology program that addresses the issues associated with the structure/control interactions for these classes of spacecraft is discussed. The goal of the NASA control of flexible structures technology program is to generate a technology data base that will provide the designer with options and approaches to achieve spacecraft performance such as maintaining geometry and/or suppressing undesired spacecraft dynamics. This technology program will define the appropriate combination of analysis, ground testing, and flight testing required to validate the structural/controls analysis and design tools. This work was motivated by a recognition that large minimum weight space structures will be required for many future missions. The tools necessary to support such design included: (1) improved structural analysis; (2) modern control theory; (3) advanced modeling techniques; (4) system identification; and (5) the integration of structures and controls.
Modeling and dynamic environment analysis technology for spacecraft
NASA Astrophysics Data System (ADS)
Fang, Ren; Zhaohong, Qin; Zhong, Zhang; Zhenhao, Liu; Kai, Yuan; Long, Wei
Spacecraft sustains complex and severe vibrations and acoustic environments during flight. Predicting the resulting structures, including numerical predictions of fluctuating pressure, updating models and random vibration and acoustic analysis, plays an important role during the design, manufacture and ground testing of spacecraft. In this paper, Monotony Integrative Large Eddy Simulation (MILES) is introduced to predict the fluctuating pressure of the fairing. The exact flow structures of the fairing wall surface under different Mach numbers are obtained, then a spacecraft model is constructed using the finite element method (FEM). According to the modal test data, the model is updated by the penalty method. On this basis, the random vibration and acoustic responses of the fairing and satellite are analyzed by different methods. The simulated results agree well with the experimental ones, which shows the validity of the modeling and dynamic environment analysis technology. This information can better support test planning, defining test conditions and designing optimal structures.
Expert diagnostics system as a part of analysis software for power mission operations
NASA Technical Reports Server (NTRS)
Harris, Jennifer A.; Bahrami, Khosrow A.
1993-01-01
The operation of interplanetary spacecraft at JPL has become an increasingly complex activity. This complexity is due to advanced spacecraft designs and ambitious mission objectives which lead to operations requirements that are more demanding than those of any previous mission. For this reason, several productivity enhancement measures are underway at JPL within mission operations, particularly in the spacecraft analysis area. These measures aimed at spacecraft analysis include: the development of a multi-mission, multi-subsystem operations environment; the introduction of automated tools into this environment; and the development of an expert diagnostics system. This paper discusses an effort to integrate the above mentioned productivity enhancement measures. A prototype was developed that integrates an expert diagnostics system into a multi-mission, multi-subsystem operations environment using the Galileo Power / Pyro Subsystem as a testbed. This prototype will be discussed in addition to background information associated with it.
Business Case Analysis for Replacing the Mazak 30Y Mill-Turn Machine in SM-39. Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Booth, Steven Richard; Dinehart, Timothy Grant; Benson, Faith Ann
2015-03-19
Business case studies are being looked at to support procurement of new machines and capital equipment in the SM-39 and TA-03-0102 machine shops. The first effort conducted economic analysis of replacing the Mazak 30Y Mill-Turn Machine located in SM-39. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. The conditions under the two scenarios were defined via interviews with subject matter experts in terms of one-time and periodic costs. The results of the analysis were compiled in a life-cycle cost/benefit table. The costs of procuring, installing,more » and maintaining a new machine were balanced against the costs avoided by replacing older machinery. Productivity savings were included as a measure to show the costs avoided by being able to produce parts at a quicker and more efficient pace.« less
Integrated Procurement Management System, Version II
NASA Technical Reports Server (NTRS)
Collier, L. J.
1985-01-01
Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.