Sample records for specific management plan

  1. 33 CFR 279.5 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... utilize an interdisciplinary team with leadership by planning, and participation from engineering, design.... Subsequent aspects of planning, development, and management for the specific project will be directed to... management plans for each specific water resource project, including at least one public meeting. The...

  2. Suicide Management Plan--Post Suicide Response.

    ERIC Educational Resources Information Center

    Imhoff, Robert; Royster, Sharon

    This document contains a suicide management plan developed specifically for colleges. The suicide management plan described includes pre-planning, immediate response to the event, press releases, college staff jobs, college responses (such as memorials or scholarships), interaction with the family, and staff counseling. The plan is presented as a…

  3. Region 7 Quality Management Plan

    EPA Pesticide Factsheets

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  4. 40 CFR 63.11519 - What are my notification, recordkeeping, and reporting requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., a brief characterization of the types of products (e.g., aerospace components, sports equipment, etc... of emissions opacity. (9) Site-specific Welding Emissions Management Plan reporting. You must submit...-Specific Welding Emissions Management Plan and any subsequent revisions to the plan pursuant to § 63.11516...

  5. 36 CFR 219.7 - Plan decisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Forest System Land and Resource Management Planning The Framework for Planning § 219.7 Plan decisions... the Forest Service national strategic plan to specific national forests and grasslands. While plan... management actions necessary for the achievement of desired conditions and objectives and compliance with...

  6. 36 CFR 219.7 - Plan decisions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Forest System Land and Resource Management Planning The Framework for Planning § 219.7 Plan decisions... the Forest Service national strategic plan to specific national forests and grasslands. While plan... management actions necessary for the achievement of desired conditions and objectives and compliance with...

  7. Solid waste information and tracking system server conversion project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY, D.L.

    1999-04-12

    The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.

  8. Talent Management: Emphasis on Action

    ERIC Educational Resources Information Center

    Butterfield, Barbara

    2008-01-01

    Recent discussions among HR practitioners in higher education have focused on talent management; specifically, the concept of developing a college or university talent management approach balanced between planning and action. Talent management as a planning tool looks very similar to workforce planning, but where HR will experience a real…

  9. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... University Laboratories XL Project-Laboratory Environmental Management Standard § 262.105 What must be included in the laboratory environmental management plan? (a) Each University must include specific... laboratory environmental management plan? 262.105 Section 262.105 Protection of Environment ENVIRONMENTAL...

  10. Solid Waste Information and Tracking System Client Server Conversion Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GLASSCOCK, J.A.

    2000-02-10

    The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion

  11. Do more specific plans help you lose weight? Examining the relationship between plan specificity, weight loss goals, and plan content in the context of a weight management programme.

    PubMed

    Dombrowski, Stephan U; Endevelt, Ronit; Steinberg, David M; Benyamini, Yael

    2016-11-01

    The conditions under which planning for behaviour change is most effective are not fully understood. In the context of a weight management programme, we examined the interrelationship between plan specificity, type of behaviour planned (diet vs. exercise), and weight loss goals. Prospective design and content analysis of plans formed by participants of a 10-week weight management programme. Participants (n = 239) formulated two plans, for dietary and exercise behaviours, respectively. Plans were rated for specificity by examining the number of plan components. Weight loss goals were assessed by asking how much weight participants intend to lose. Weight was measured objectively each of the 10 weeks. Changes in body mass index (BMI) over time and the interactions between plan specificity and weight loss goals, for all plans and separately for diet and exercise, were estimated using linear mixed models. Plan specificity was unrelated to weight loss, but interacted with weight loss goals in predicting linear change in BMI (t = -2.48): More specific plans were associated with higher decreases in weight in participants with high weight loss goals. Separate interaction tests for plans formulated for diet and exercise change showed that more specific dietary plans, but not exercise plans, were associated with higher decreases in weight in participants with high weight loss goals (t = -2.21). Within a population that is highly motivated to lose weight, the combination of high weight loss goals and formulating detailed plans for changing dietary behaviours may be most effective in supporting weight loss. Statement of contribution What is already known on this subject? More specific plans are associated with increased performance of health-related behaviours. More motivated individuals form more specific plans. The interrelationship between plan specificity, plan content and behaviour-related goals in relation intervention effectiveness has not been explored to date. What does this study add? The effectiveness of forming specific plans may depend on the strength of behaviour-related goals as well as the behaviour selected for change. More detailed plans, in particular dietary plans, were related to greater weight loss, but only for participants with higher initial weight loss goals. Detailed exercise plans were not associated with weight loss, regardless of initial weight loss goals. © 2016 The British Psychological Society.

  12. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  13. Analysis of California Condor (Gymnogyps californianus) use of six management units using location data from global positioning system transmitters, southern California, 2004-09-Initial report

    USGS Publications Warehouse

    Johnson, Matthew; Kern, Jeffrey; Haig, Susan M.

    2010-01-01

    This report provides an analysis of California Condor (Gymnogyps californianus) space use of six management units in southern California (Hopper Mountain and Bitter Creek National Wildlife Refuges, Wildlands Conservancy-Wind Wolves Preserve, Tejon Mountain Village Specific Plan, California Condor Study Area, and the Tejon Ranch excluding Tejon Mountain Village Specific Plan and California Condor Study Area). Space use was analyzed to address urgent management needs using location data from Global Positioning System transmitters. The U.S. Fish and Wildlife Service provided the U.S. Geological Survey with location data (2004-09) for California Condors from Global Positioning System transmitters and Geographic Information System data for the six management units in southern California. We calculated relative concentration of use estimates for each management unit for each California Condor (n = 21) on an annual basis (n = 39 annual home ranges) and evaluated resource selection for the population each year using the individual as our sampling unit. The most striking result from our analysis was the recolonization of the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units during 2008. During 2004-07, the home range estimate for two (25 percent) California Condors overlapped the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units (n = 8), and use within the annual home range generally was bimodal and was concentrated on the Bitter Creek and Hopper Mountain National Wildlife Refuges. However, 10 (77 percent) California Condor home ranges overlapped the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units during 2008 (n = 13), and by 2009, the home range of every condor carrying a Global Positioning System transmitter (n = 14) overlapped these management units. Space use was multimodal within the home range during 2008-09 and was concentrated on Hopper Mountain Refuge in the south, Bittercreek Refuge and the Wind Wolves Preserve in the northwest, and the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units in the northeast. Recolonization of the Tejon Mountain Village Specific Plan, California Condor Study Area, and Tejon Ranch management units reestablished traditional condor movement and foraging patterns in southern California and provides the travel corridor (approximately 20 kilometers wide) for recolonization of the northeastern part of the species historical range.

  14. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: QUALITY AND MANAGEMENT PLAN FOR THE PILOT PERIOD (1995-2000)

    EPA Science Inventory

    Based upon the structure and specifications in ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs, the Environmental Technology Verification (ETV) program Quality and Management Plan (QMP) f...

  15. Planning documents: a business planning strategy.

    PubMed

    Kaehrle, P A

    2000-06-01

    Strategic planning and business plan development are essential nursing management skills in today's competitive, fast paced, continually changing health care environment. Even in times of great uncertainty, nurse managers need to plan and forecast for the future. A well-written business plan allows nurse managers to communicate their expertise and proactively contribute to the programmatic decisions and changes occurring within their patient population or service area. This article presents the use of planning documents as a practical, strategic business planning strategy. Although the model addresses orthopedic services specifically, nurse managers can gain an understanding and working knowledge of planning concepts that can be applied to all patient populations.

  16. Strategic and tactiocal planning for managing national park resources

    Treesearch

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  17. Multi-Institution Research Centers: Planning and Management Challenges

    ERIC Educational Resources Information Center

    Spooner, Catherine; Lavey, Lisa; Mukuka, Chilandu; Eames-Brown, Rosslyn

    2016-01-01

    Funding multi-institution centers of research excellence (CREs) has become a common means of supporting collaborative partnerships to address specific research topics. However, there is little guidance for those planning or managing a multi-institution CRE, which faces specific challenges not faced by single-institution research centers. We…

  18. 77 FR 49775 - Beaverhead-Deerlodge National Forest, Wisdom and Wise River Ranger Districts; Montana; North and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... of the North and West Big Hole Allotment Management Plans (NWBH AMP's) project is the updating of eleven domestic livestock grazing management plans. The scope of the project is limited to the specific... River Ranger Districts; Montana; North and West Big Hole Allotment Management Plans AGENCY: Forest...

  19. Health plans' disease management programs: extending across the medical and behavioral health spectrum?

    PubMed

    Merrick, Elizabeth Levy; Horgan, Constance M; Garnick, Deborah W; Hodgkin, Dominic; Morley, Melissa

    2008-01-01

    Although the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health and depression program characteristics are highly variable.

  20. Health Plans' Disease Management Programs: Extending across the Medical and Behavioral Health Spectrum?

    PubMed Central

    Merrick, Elizabeth Levy; Horgan, Constance M.; Garnick, Deborah W.; Hodgkin, Dominic; Morley, Melissa

    2015-01-01

    While the disease management industry has expanded rapidly, there is little nationally representative data regarding medical and behavioral health disease management programs at the health plan level. National estimates from a survey of private health plans indicate that 90% of health plan products offered disease management for general medical conditions such as diabetes, but only 37% had depression programs. The frequency of specific depression disease management activities varied widely. Program adoption was significantly related to product type and behavioral health contracting. In health plans, disease management has penetrated more slowly into behavioral health, and depression program characteristics are highly variable. PMID:18806594

  1. Tank waste remediation system tank waste retrieval risk management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klimper, S.C.

    1997-11-07

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure.

  2. Development of Kentucky's highway incident management strategic plan.

    DOT National Transportation Integrated Search

    2005-05-01

    ven though Kentucky has undertaken many initiatives to improve specific aspects of incident management, there has never been a plan that establishes an overall framework for a systematic, statewide, multi-agency effort to improve the management of hi...

  3. Identifying critical issues in recreation planning and management: improving the management-research partnership

    Treesearch

    John H. Schomaker; David W. Lime

    1988-01-01

    The "nominal group" process is a proven technique to systematically arrive at a consensus about critical information needs in recreation planning and management. Using this process, 41 managers who attended a 1983 conference on river management identified 114 specific information needs grouped under 11 general questions. Clearly, some concerns of...

  4. [Post-marketing drug safety-risk management plan(RMP)].

    PubMed

    Ezaki, Asami; Hori, Akiko

    2013-03-01

    The Guidance for Risk Management Plan(RMP)was released by the Ministry of Health, Labour and Welfare in April 2012. The RMP consists of safety specifications, pharmacovigilance plans and risk minimization action plans. In this paper, we outline post-marketing drug safety operations in PMDA and the RMP, with examples of some anticancer drugs.

  5. Specific application for Oak Ridge National Laboratory dismantlement of Building 3004. Appendix A -- Quality assurance plan; Appendix B -- Records management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This quality assurance (QA) plan defines the QA requirements for the dismantlement and removal of Building 3004 at Oak Ridge National Laboratory (ORNL). The building is a four-story wooden trained structure with wooden siding, which resides approximately 150 ft west of the Bulk Shielding Reactor, and only several feet away from the visitors entrance to the Graphite Reactor museum. Complete descriptions and sketches are in the Performance Specification document for this project. This project is being conducted as a non-CERCLA maintenance action. This plan is an appendix to the QA plan for the ORNL Environmental Restoration (ER) Program. ORNL/ER-225, whichmore » is the source of the project QA requirements, tailors those QA requirements to the specific needs of this project as defined in ORNL/ER-225. Project-specific description and organization are also provided in this plan. Appendix B, Records Management Plan, is included.« less

  6. Introduction to Soil Fumigant Management Plans

    EPA Pesticide Factsheets

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  7. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  8. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  9. 40 CFR 262.214 - Laboratory management plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Waste Determination and Accumulation of Unwanted Material for Laboratories Owned by Eligible Academic Entities § 262.214 Laboratory management plan. An eligible academic entity must develop and retain a... a site-specific document that describes how the eligible academic entity will manage unwanted...

  10. Hellsgate Big Game Winter Range Wildlife Mitigation Site Specific Management Plan for the Hellsgate Project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berger, Matthew T.; Judd, Steven L.

    This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.

  11. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... facilities, instream spawning facilities, water control structures, and fencing that aid in the conservation... biological resources. (g) Applied research that targets specific biological information or management needs...

  12. 43 CFR 10005.15 - Planning and management techniques applicable to the plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... facilities, instream spawning facilities, water control structures, and fencing that aid in the conservation... biological resources. (g) Applied research that targets specific biological information or management needs...

  13. Materiel Acquisition Management Guide

    DTIC Science & Technology

    1980-02-11

    Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY

  14. A Case Study of Resources Management Planning with Multiple Objectives and Projects

    Treesearch

    David L. Peterson; David G. Silsbee; Daniel L. Schmoldt

    1995-01-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...

  15. The Development of Kidney Stone Dietary Plans for Patient Education

    ERIC Educational Resources Information Center

    Dennison, Darwin; Mayo, M. Leah; Abraham, Victor E.

    2011-01-01

    Currently patient education programs and urology practices provide individuals with "lists of foods to avoid" for dietary management of kidney stones. However, "planned diets" that include daily meal plans and recipes provide structure and specificity for diet management and are preferred by many individuals. This article describes the development…

  16. A ten-step process to develop case management plans.

    PubMed

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  17. San Bernardino Valley College Strategic Enrollment Management Plan: Recruitment and Retention, 2000-2002.

    ERIC Educational Resources Information Center

    Romero, David T., Ed.

    The San Bernardino Valley College (California) Strategic Enrollment Management (SEM) Plan was developed to specifically increase student enrollment and to improve retention over 2000-2002, and thereafter. Presents the SEM plan in two parts: recruitment and retention. The date, description, action, person responsible, date needed, date completed,…

  18. Armored Family of Vehicles (AFV). Phase 1 Report. Book 7. Volume 11

    DTIC Science & Technology

    1987-08-31

    Armored Family of Vehicles. Specific requirements and products are described which initiate the training development process and a training management ...approach for the TRADOC and proponent schools to plan, develop, manage and integrate the training subsystem(s) for the Armored Family of Vehicles...Procedures. q. Charter, Armored Family of Vehicles. r. Operational and Organizational (O&W) Plan for AFV. s. System MANPRINT Management Plan for AFV

  19. 76 FR 37761 - Fisheries Off West Coast States; Coastal Pelagic Species Fisheries; Amendment 13 to the Coastal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ...; Amendment 13 to the Coastal Pelagic Species Fishery Management Plan; Annual Catch Limits AGENCY: National... the Coastal Pelagic Species (CPS) Fishery Management Plan (FMP). This proposed rule will implement... in place to set and adjust fishery specifications and management measures and modifies this framework...

  20. Innovative applications of artificial intelligence

    NASA Astrophysics Data System (ADS)

    Schorr, Herbert; Rappaport, Alain

    Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.

  1. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general;more » in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.« less

  2. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parr, P.D.; Evans, J.W.

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selectedmore » species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.« less

  3. Resource Management in the Microgravity Science Division

    NASA Technical Reports Server (NTRS)

    Casselle, Justine

    2004-01-01

    In the Microgravity Science Division, the primary responsibilities of the Business Management Office are resource management and data collection. Resource management involves working with a budget to do a number of specific projects, while data collection involves collecting information such as the status of projects and workforce hours. This summer in the Business Management Office I assisted Margie Allen with resource planning and the implementation of specific microgravity projects. One of the main duties of a Project Control Specialists, such as my mentor, is to monitor and analyze project manager s financial plans. Project managers work from the bottom up to determine how much money their project will cost. They then set up a twelve month operating plan which shows when money will be spent. I assisted my mentor in checking for variances in her data against those of the project managers. In order to successfully check for those variances, we had to understand: where the project is including plans vs. actual performance, why it is in its present condition, and what the future impact will be based on known budgetary parameters. Our objective was to make sure that the plan, or estimated resources input, are a valid reflection of the actual cost. To help with my understanding of the process, over the course of my tenure I had to obtain skills in Microsoft Excel and Microsoft Access.

  4. Disaster relief volunteerism: Evaluating cities' planning for the usage and management of spontaneous volunteers.

    PubMed

    Rivera, Jason David; Wood, Zachary David

    2016-01-01

    This exploratory study sought to observe the perceptions, usage, and planned management of spontaneous volunteers in disaster planning and response within various urban environments. The authors discuss the perceptions of spontaneous volunteerism in America, specifically the challenges of using spontaneous volunteers in disaster response activities. A content analysis of the 50 largest cities in the US Office of Emergency Management Web sites and a survey instrument administered to emergency managers in these 50 cities were used to explore various questions raised throughout the discussion of the literature. The authors found significant discrepancies between what is stated in the disaster plans of cities and what emergency managers claim is covered in their plans. Of the managers surveyed, only a handful mention spontaneous volunteers in their plans at all, and even fewer cities discuss them extensively. In addition, stated perceptions of the value of spontaneous volunteers may impact both how we plan for them and the value they provide.

  5. SIMULATION MODEL FOR WATERSHED MANAGEMENT PLANNING. VOLUME 2. MODEL USER MANUAL

    EPA Science Inventory

    This report provides a user manual for the hydrologic, nonpoint source pollution simulation of the generalized planning model for evaluating forest and farming management alternatives. The manual contains an explanation of application of specific code and indicates changes that s...

  6. A case study of assigning conservation value to dispersed habitat units for conservation planning

    USGS Publications Warehouse

    Rohweder, Jason J.; Sara C. Vacek,; Crimmins, Shawn M.; Thogmartin, Wayne E.

    2015-01-01

    Resource managers are increasingly tasked with developing habitat conservation plans in the face of numerous, sometimes competing, objectives. These plans must often be implemented across dispersed habitat conservation units that may contribute unequally to overall conservation objectives. Using U.S. Fish and Wildlife Service waterfowl production areas (WPA) in western Minnesota as our conservation landscape, we develop a landscape-scale approach for evaluating the conservation value of dispersed habitat conservation units with multiple conservation priorities. We evaluated conservation value based on a suite of variables directly applicable to conservation management practices, thus providing a direct link between conservation actions and outcomes. We developed spatial models specific to each of these conservation objectives and also developed two freely available prioritization tools to implement these analyses. We found that some WPAs provided high conservation value across a range of conservation objectives, suggesting that managing these specific areas would achieve multiple conservation goals. Conversely, other WPAs provided low conservation value for some objectives, suggesting they would be most effectively managed for a distinct set of specific conservation goals. Approaches such as ours provide a direct means of assessing the conservation value of dispersed habitat conservation units and could be useful in the development of habitat management plans, particularly when faced with multiple conservation objectives.

  7. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    ERIC Educational Resources Information Center

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  8. Strategic Planning for Management Information Systems.

    ERIC Educational Resources Information Center

    Ein-Dor, Phillip; Segev, Eli

    1978-01-01

    Two factors predominate in determining the appropriateness of strategic plans for management information systems (MIS)--explicitness (the degree to which the process is conscious, formal, and documented) and situational fit (the degree to which the MIS is compatible with the specific organization and its members). (Author/IRT)

  9. [New professional field in France: Analysis of the training needs of case managers].

    PubMed

    Somme, Dominique; Corvol, Aline; Couturier, Yves; Pimouguet, Clément; Moreau, Olivier; Perivier, Samuel; Balard, Frédéric; de Stampa, Matthieu

    2015-01-01

    Case management is a relatively new career field in France. It was first introduced on an experimental basis in 2007-2008, and was then developedfollowing the National Alzheimer Plan and finally enshrined in legislation in 2012. This careerfield is based on a set of tasks widely described internationally: identifying the right level of intervention, standardized multidimensional assessment, planning all aid (care and social services), implementation of the plan, monitoring and reassessment and periodic reassessment of all needs in a continuous and long-term process. The specific, systematic and dedicated nature of these tasks to these tasks makes training essential. Regulations also stipulate that the professional must acquire additional training by a dedicated inter-university degree. This requirement is a French specificity The authors present the history of case management and training in France and analyze the various international training frameworks identified by an Internet search. Moreover, based on the opinions expressed by case managers at different times of the scientific assessment and a review ofseveral studies conducted by inter-university case management program students, this article highlights the specific training needs of case managers and how the proposed training can meet these needs.

  10. The need for coherence between waterfowl harvest and habitat management

    USGS Publications Warehouse

    Runge, M.C.; Johnson, F.A.; Anderson, M.G.; Koneff, M.D.; Reed, E.T.; Mott, S.E.

    2006-01-01

    Two of the most significant management efforts affecting waterfowl populations in North America are the North American Waterfowl Management Plan (the Plan) and Federal harvest management programs. Both the Plan and harvest management are continental in scope, involve an extensive group of stakeholders, and rely on adaptive processes of biological planning, implementation, and evaluation. The development of these programs has occurred independently, however, and there has been little explicit recognition that both harvest and habitat effects should be considered for coherent management planning and evaluation. For example, the harvest strategy can affect whether population objectives of the Plan are met, irrespective of the success of the Plan's habitat conservation efforts. Conversely, habitat conservation activities under the Plan can influence harvest potential and, therefore, the amount of hunting opportunity provided. It seems increasingly clear that the Plan's waterfowl population objectives can only be useful for conservation planning and evaluation if they are accompanied by an explicit specification of the harvest strategy and environmental conditions under which they are to be achieved. This clarification also is necessary to ensure that Plan population objectives are not attained solely through the reduction of hunting opportunity. We believe then that it is imperative that these key waterfowl-management programs work to harmonize their objectives. Harvest management programs and the Plan ought to be working toward the same ends, but that is not possible so long as the mutually reinforcing relationship of these programs is obscured by ambiguities in their management objectives.

  11. Organization Development Strategies in Educational Policy Planning and Management.

    ERIC Educational Resources Information Center

    Jones, B. Kathryn; Biles, Stephen

    1990-01-01

    This synthesis reviews organizational development (OD) and its decision tools, describes OD applications in educational organizations, explores OD's limitations, and predicts how OD will influence future educational decision making. Findings identify eight specific management and planning areas where OD can be used to improve organizational…

  12. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kellie, C.L.

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  13. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    PubMed

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  14. Assessing hospital emergency management plans: a guide for infection preventionists.

    PubMed

    Rebmann, Terri

    2009-11-01

    Hospital emergency management plans are essential and must include input from an infection preventionist (IP). Multiple hospital planning documents exist, but many do not address infection prevention issues, combine them with noninfection prevention issues, or are disease/event specific. An all-encompassing emergency management planning guide for IPs is needed. A literature review and Internet search were conducted in December 2008. Data from relevant sources were extracted. A spreadsheet was created that delineated hospital emergency management plan components of interest to IPs. Of the sources screened, 49 were deemed relevant. Eleven domains were identified: (1) having a plan; (2) assessing hospital readiness; (3) having infection prevention policies and procedures; (4) having occupational health policies and procedures; (5) conducting surveillance and triage; (6) reporting incidents, having a communication plan, and managing information; (7) having laboratory support; (8) addressing surge capacity issues; (9) having anti-infective therapy and/or vaccines; (10) providing infection prevention education; and (11) managing physical plant issues. Infection preventionists should use this article as an assessment tool for evaluating their hospital emergency management plan and for developing policies and procedures that will decrease the risk of infection transmission during a mass casualty event.

  15. Strategic Planning for Collegiate Athletics.

    ERIC Educational Resources Information Center

    Yow, Deborah A.; Migliore, R. Henry; Bowden, William W.; Stevens, Robert E.; Loudon, David L.

    This book presents strategies for planning and managing athletic programs. It helps college athletic administrators analyze their organization's environment, set objectives, decide on specific actions, and obtain feedback. Chapter 1, "Perspectives on Planning for Athletics Programs," discusses what planning is and why it is important.…

  16. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options.

    PubMed

    Rani, Manju; Nusrat, Sharmin; Hawken, Laura H

    2012-10-16

    Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions- institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms.Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as 'program management and implementation' entities rather than as lead 'technical advisory' bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. The 'technical functions' and 'implementation and management functions' should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH.The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs.

  17. A qualitative study of governance of evolving response to non-communicable diseases in low-and middle- income countries: current status, risks and options

    PubMed Central

    2012-01-01

    Background Segmented service delivery with consequent inefficiencies in health systems was one of the main concerns raised during scaling up of disease-specific programs in the last two decades. The organized response to NCD is in infancy in most LMICs with little evidence on how the response is evolving in terms of institutional arrangements and policy development processes. Methods Drawing on qualitative review of policy and program documents from five LMICs and data from global key-informant surveys conducted in 2004 and 2010, we examine current status of governance of response to NCDs at national level along three dimensions— institutional arrangements for stewardship and program management and implementation; policies/plans; and multisectoral coordination and partnerships. Results Several positive trends were noted in the organization and governance of response to NCDs: shift from specific NCD-based programs to integrated NCD programs, increasing inclusion of NCDs in sector-wide health plans, and establishment of high-level multisectoral coordination mechanisms. Several areas of concern were identified. The evolving NCD-specific institutional structures are being treated as ‘program management and implementation’ entities rather than as lead ‘technical advisory’ bodies, with unclear division of roles and responsibilities between NCD-specific and sector-wide structures. NCD-specific and sector-wide plans are poorly aligned and lack prioritization, costing, and appropriate targets. Finally, the effectiveness of existing multisectoral coordination mechanisms remains questionable. Conclusions The ‘technical functions’ and ‘implementation and management functions’ should be clearly separated between NCD-specific units and sector-wide institutional structures to avoid duplicative segmented service delivery systems. Institutional capacity building efforts for NCDs should target both NCD-specific units (for building technical and analytical capacity) and sector-wide organizational units (for building program management and implementation capacity) in MOH. The sector-wide health plans should reflect NCDs in proportion to their public health importance. NCD specific plans should be developed in close consultation with sector-wide health- and non-health stakeholders. These plans should expand on the directions provided by sector-wide health plans specifying strategically prioritized, fully costed activities, and realistic quantifiable targets for NCD control linked with sector-wide expenditure framework. Multisectoral coordination mechanisms need to be strengthened with optimal decision-making powers and resource commitment and monitoring of their outputs. PMID:23067232

  18. Oncology disease management.

    PubMed

    Fetterolf, Donald E; Terry, Rachel

    2007-02-01

    Oncologic conditions are ubiquitous medical illnesses that present a particular challenge for medical management programs designed to address quality and cost issues in patient populations. Disease management strategies represent a reasonable and effective approach for employers and health plans in their arsenal of health management strategies. Multiple reasons exist for the development of specialized disease management programs that deal with cancer patients, some unique to this group of individuals. Health plans and/or employers have solid justification for addressing these issues directly through programs developed specifically to work with cancer patients. Whether developed within a health plan, or "carved out" to an external vendor, proper evaluation of outcomes is essential.

  19. 33 CFR 385.5 - Guidance memoranda.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sources of water will occur as a result of implementation of the Plan (§ 385.36(b)). (b) Special processes..., implementation, and management of one specific individual feature of the Plan, this section does not require... § 385.5 Guidance memoranda. (a) General. (1) Technical guidance for internal management of Corps of...

  20. 77 FR 65363 - New England Fishery Management Council (NEFMC); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... present an overview of the NEFSC draft Strategic Plan. A question and answer period is scheduled to [[Page... to modify accountability measures (AMs) in the Herring Fishery Management Plan (FMP). A public... measures, will be addressed during the remainder of the day. Decisions may include: specifications for the...

  1. 77 FR 22286 - Western Pacific Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... Team (PPT) in Honolulu, HI to discuss fishery issues and develop recommendations for future management... and Central Pacific Fishery Commission 8. Other business 9. Public comment 10. Pelagic Plan Team... meetings. Plan Team action will be restricted to those issues specifically listed in this document and any...

  2. Los Alamos National Laboratory emergency management plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents,more » transportation accidents, electrical accidents, and natural disasters.« less

  3. Results from a national survey on chronic care management by health plans.

    PubMed

    Mattke, Soeren; Higgins, Aparna; Brook, Robert

    2015-05-01

    The growing burden of chronic disease necessitates innovative approaches to help patients and to ensure the sustainability of our healthcare system. Health plans have introduced chronic care management models, but systematic data on the type and prevalence of different approaches are lacking. Our goal was to conduct a systematic examination of chronic care management programs offered by health plans in the commercial market (ie, in products sold to employers and individuals. We undertook a national survey of a representative sample of health plans (70 plans, 36% response rate) and 6 case studies on health plans' programs to improve chronic care in the commercial market. The data underwent descriptive and bivariate analyses. All plans, regardless of size, location, and ownership, offer chronic care management programs, which identify eligible members from claims data and match them to interventions based on overall risk and specific care gaps. Plans then report information on care gaps to providers and offer self-management support to their members. While internal evaluations suggest that the interventions improve care and reduce cost, plans report difficulties in engaging members and providers. To overcome those obstacles, plans are integrating their programs into provider work flow, collaborating with providers on care redesign and leveraging patient support technologies. Our study shows that chronic care management programs have become a standard component of the overall approach used by health plans to manage the health of their members.

  4. Configuration management program plan for Hanford site systems engineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, A.G.

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  5. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  6. Financial remuneration is positively correlated with the number of clinical activities: an example from diabetes management in Alberta community pharmacies.

    PubMed

    Bharadia, Rajan; Lorenz, Kathleen; Cor, Ken; Simpson, Scot H

    2018-02-01

    To determine whether use of a compensation plan to remunerate pharmacists for clinical pharmacy services was associated with the number of diabetes management activities provided. Alberta pharmacists were asked about compensation plan use and frequency they provide a list of 80 diabetes management activities. A total of 168 community pharmacists responded to the survey. When compensation plan use, diabetes-specific training, practice characteristics and additional authorizations were incorporated into a factorial ANOVA, pharmacists who used the compensation plan reported a mean of 42.9 (95% CI 39.4 to 46.4) diabetes management activities, while those who did not reported a mean of 29.9 (95% CI 21.4 to 38.4) activities (P = 0.016). After considering other important influencing factors, use of the compensation plan is positively correlated with the number of diabetes management activities pharmacists provided. © 2017 Royal Pharmaceutical Society.

  7. [Planning With Nanda, Noc, Nic Taxonomies In Neurologic Rehabilitation. A clinical study].

    PubMed

    Iori, Alessandra; Foracchia, Marco; Gradellini, Cinzia

    2015-01-01

    Nursing classifications identify a specific professional responsibility, increase nursing visibility, according with nursing evolution of these last years. To evaluate care planning with NANDA taxonomy in neurologic rehabilitation context. Care plan managing with NANDA taxonomy, regarding diagnosis of constipation and impaired skin integrity, using a computerized tool for systematically observation, organized in check list. Registered data with taxonomy planning are higher in quantitative and qualitative terms. For most of patients (87%) one diagnosis has been opened, both diagnosis for 60% of them. Nursing care plan with NANDA taxonomy can be considered a valid methodology of care for neurologic patient, this since it requests a deep and complete registration of first assessment a systematically registration of each monitoring, it increases visibility of nursing job, and it underlines specific autonomy and responsibility in prevention and management of problems.

  8. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, K.A.; Mitchell, M.M.; Jean, D.

    1997-09-01

    This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations.

  9. Planning for School Emergencies.

    ERIC Educational Resources Information Center

    Della-Giustina, Daniel E.

    This document is designed to provide civil leaders and school administrators with a resource that will enable them to develop comprehensive contingency plans for specific emergency situations. A discussion of disaster and emergency management planning includes an outline of the objectives of emergency planning that were established for this guide.…

  10. The challenges and related strategies of planning for wilderness experiences

    Treesearch

    Kerri Cahill

    2012-01-01

    Planning is where science, public interests and management of wilderness areas come together. Unfortunately, science and information specifically supporting wilderness experiences, if any exists, is often perceived by managers as subjective, value laden, and hard to defend. This can sometimes lead to the tough decisions about providing high quality wilderness...

  11. Implementation Planning and Progress on Physical Activity Goals: The Mediating Role of Life-Management Strategies

    ERIC Educational Resources Information Center

    Dugas, Michelle; Gaudreau, Patrick; Carraro, Natasha

    2012-01-01

    This 4-week prospective study examined whether the use of life-management strategies mediates the relationship between implementation planning and short-term progress on physical activity goals. In particular, the strategies of elective selection, compensation, and loss-based selection were disentangled to assess their specific mediating effects.…

  12. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less

  13. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  14. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  15. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  16. 40 CFR 68.180 - Emergency response program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...

  17. High resolution microwave spectrometer sounder (HIMSS), volume 1, book 2

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The following topics are presented with respect to the high resolution microwave spectrometer sounder (HIMSS) that is to be used as an instrument for NASA's Earth Observing System (EOS): (1) preliminary program plans; (2) contract end item (CEI) specification; and (3) the instrument interface description document. Under the preliminary program plans section, plans dealing with the following subject areas are discussed: spares, performance assurance, configuration management, software implementation, contamination, calibration management, and verification.

  18. Cunning Plan--How Will We Ever Manage to Teach All That?! A Cunning Plan for Building Useful Knowledge at Key Stage 3 and Transferring it to Key Stage 4

    ERIC Educational Resources Information Center

    Carr, Elizabeth

    2016-01-01

    Planning to deliver the new GCSE [General Certificate of Secondary Education] specifications presents a challenge and an opportunity to any history department, whatever their previous specification. The sweep of history that students will now study at GCSE is much broader than "Modern World" departments are used to; including a medieval…

  19. Groundwater regulation and integrated planning

    USGS Publications Warehouse

    Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.

    2016-01-01

    The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.

  20. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    PubMed

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    RIECK, C.A.

    1999-02-23

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive designmore » package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.« less

  2. The 1977 WARC on broadcasting satellites - Spectrum management aspects and implications

    NASA Technical Reports Server (NTRS)

    Gould, R. G.; Reinhart, E. E.

    1977-01-01

    Broadcasting satellites are allocated as a primary service in the band 11.7-12.2 GHz (11.7-12.5 GHz in Europe, Africa, and the USSR), but the band is also allocated on a primary basis (equal sharing) to other services - fixed, mobile, broadcasting, and fixed satellite. Presented with these difficult sharing situations, delegates from over 100 countries met at an ITU World Administrative Radio Conference in 1977 to develop a plan for broadcasting satellites. Many nations wanted a plan that would assign to them now, reserved orbital locations and channel asignments for their future use. Other countries wanted a plan adopted now for future broadcasting satellites which assigned specific channels to specific areas on the ground so that they could use the remaining frequencies to provide terrestrial service right away. This paper describes the 'Plan' developed at the conference and points out how the principles of spectrum management were employed. It also discusses the implications for future international management of the spectrum growing out of this meeting.

  3. Computer integrated manufacturing/processing in the HPI. [Hydrocarbon Processing Industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoshimura, J.S.

    1993-05-01

    Hydrocarbon Processing and Systemhouse Inc., developed a comprehensive survey on the status of computer integrated manufacturing/processing (CIM/CIP) targeted specifically to the unique requirements of the hydrocarbon processing industry. These types of surveys and other benchmarking techniques can be invaluable in assisting companies to maximize business benefits from technology investments. The survey was organized into 5 major areas: CIM/CIP planning, management perspective, functional applications, integration and technology infrastructure and trends. The CIM/CIP planning area dealt with the use and type of planning methods to plan, justify implement information technology projects. The management perspective section addressed management priorities, expenditure levels and implementationmore » barriers. The functional application area covered virtually all functional areas of organization and focused on the specific solutions and benefits in each of the functional areas. The integration section addressed the needs and integration status of the organization's functional areas. Finally, the technology infrastructure and trends section dealt with specific technologies in use as well as trends over the next three years. In February 1993, summary areas from preliminary results were presented at the 2nd International Conference on Productivity and Quality in the Hydrocarbon Processing Industry.« less

  4. Handbook of emergency management for state-level transportation agencies.

    DOT National Transportation Integrated Search

    2010-03-01

    The Department of Homeland Security has mandated specific systems and techniques for the management of emergencies in the United States, including the Incident Command System, the National Incident Management System, Emergency Operations Plans, Emerg...

  5. SU-G-TeP4-06: An Integrated Application for Radiation Therapy Treatment Plan Directives, Management, and Reporting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matuszak, M; Anderson, C; Lee, C

    Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less

  6. 76 FR 65681 - Black Hills National Forest, Mystic Ranger District, South Dakota, Calumet Project Area

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... acres of pine stands using a variety of methods to treat MPB infested stands, reduce the overall density... actions proposed are in direct response to management direction provided by the Black Hills National Forest Land and Resource Management Plan (Forest Plan). The site specific actions are designed, based on...

  7. Plan-Do-Check-Act and the Management of Institutional Research. AIR 1992 Annual Forum Paper.

    ERIC Educational Resources Information Center

    McLaughlin, Gerald W.; Snyder, Julie K.

    This paper describes the application of a Total Quality Management strategy called Plan-Do-Check-Act (PDCA) to the projects and activities of an institutional research office at the Virginia Polytechnic Institute and State University. PDCA is a cycle designed to facilitate incremental continual improvement through change. The specific steps are…

  8. Planning and conducting a multi-institutional project on fatigue.

    PubMed

    Nail, L M; Barsevick, A M; Meek, P M; Beck, S L; Jones, L S; Walker, B L; Whitmer, K R; Schwartz, A L; Stephen, S; King, M E

    1998-09-01

    To describe the process used in proposal development and study implementation for a complex multisite project on cancer treatment-related fatigue (CRF), identify strategies used to manage the project, and provide recommendations for teams planning multisite research. Information derived from project team meeting records, correspondence, proposals, and personal recollection. The project was built on preexisting relationships among the three site investigators who then built a team including faculty, research coordinators, staff nurses, and students. Study sites had a range of organizational models, and the proposal was designed to capitalize on the organizational and resource strengths of each setting. Three team members drawn from outside oncology nursing provided expertise in measurement and experience with fatigue in other populations. Planning meetings were critical to the success of the project. Conference calls, fax technology, and electronic mail were used for communication. Flexibility was important in managing crises and shifting responsibility for specific components of the work. The team documented and evaluated the process used for multisite research, completed a major instrumentation study, and developed a cognitive-behavioral intervention for CRF. Accomplishments during the one-year planning grant exceeded initial expectations. The process of conducting multisite research is complex, especially when the starting point is a planning grant with specific research protocols to be developed and implemented over one year. Explicit planning for decision-making processes to be used throughout the project, acknowledging the differences among the study settings and planning the protocols to capitalize upon those differences, and recruiting a strong research team that included a member with planning grant and team-building expertise were essential elements for success. Specific recommendations for others planning multisite research are related to team-building, team membership, communication, behavioral norms, role flexibility, resources, feedback, problem management, and shared recognition.

  9. A Hierarchy of Management Training Requirements: The Competency Domain Model.

    ERIC Educational Resources Information Center

    Sandwith, Paul

    1993-01-01

    The Competency Domain Model has five domains of management competencies: conceptual/creative, leadership, interpersonal, administrative, and technical. Specific competencies and training plans can be identified in each domain for different levels--first line supervisor, field office manager, assistant manager, area manager, director of operations.…

  10. Resource management plan for the Oak Ridge Reservation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parr, P.D.; Evans, J.W.

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy's Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selectedmore » species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory's Environmental Sciences Division.« less

  11. Integrated planning for regional development planning and water resources management under uncertainty: A case study of Xining, China

    NASA Astrophysics Data System (ADS)

    Fu, Z. H.; Zhao, H. J.; Wang, H.; Lu, W. T.; Wang, J.; Guo, H. C.

    2017-11-01

    Economic restructuring, water resources management, population planning and environmental protection are subjects to inner uncertainties of a compound system with objectives which are competitive alternatives. Optimization model and water quality model are usually used to solve problems in a certain aspect. To overcome the uncertainty and coupling in reginal planning management, an interval fuzzy program combined with water quality model for regional planning and management has been developed to obtain the absolutely ;optimal; solution in this study. The model is a hybrid methodology of interval parameter programming (IPP), fuzzy programing (FP), and a general one-dimensional water quality model. The method extends on the traditional interval parameter fuzzy programming method by integrating water quality model into the optimization framework. Meanwhile, as an abstract concept, water resources carrying capacity has been transformed into specific and calculable index. Besides, unlike many of the past studies about water resource management, population as a significant factor has been considered. The results suggested that the methodology was applicable for reflecting the complexities of the regional planning and management systems within the planning period. The government policy makers could establish effective industrial structure, water resources utilization patterns and population planning, and to better understand the tradeoffs among economic, water resources, population and environmental objectives.

  12. Solid waste information and tracking system client-server conversion project management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    May, D.L.

    1998-04-15

    This Project Management Plan is the lead planning document governing the proposed conversion of the Solid Waste Information and Tracking System (SWITS) to a client-server architecture. This plan presents the content specified by American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards for software development, with additional information categories deemed to be necessary to describe the conversion fully. This plan is a living document that will be reviewed on a periodic basis and revised when necessary to reflect changes in baseline design concepts and schedules. This PMP describes the background, planning and management of the SWITS conversion.more » It does not constitute a statement of product requirements. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents.« less

  13. 75 FR 67809 - Magnuson-Stevens Act Provisions; Fisheries Off West Coast States; Pacific Coast Groundfish...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ...This proposed action would establish the 2011-2012 harvest specifications and management measures for groundfish taken in the U.S. exclusive economic zone (EEZ) off the coasts of Washington, Oregon, and California consistent with the Magnuson-Stevens Fishery Conservation and Management Act and the Pacific Coast Groundfish Fishery Management Plan (PCGFMP). This action revises the collection of management measures in the groundfish fishery regulations that are intended to keep the total catch of each groundfish species or species complex within the harvest specifications. This action also includes regulations to implement Amendments 16-5 and 23 to the PCGFMP. Amendment 16-5 would revise existing rebuilding plans, create a new rebuilding plan for Petrale sole, which was declared overfished on February 9, 2010, and revise status determination criteria and a harvest control rule for flatfish. This action is consistent with and partially implements Amendment 23 to the PCGFMP. Amendment 23 would make the PCGFMP consistent with the revised National Standard 1 Guidelines (74 FR 3178, January 16, 2009).

  14. Decision support frameworks and tools for conservation

    USGS Publications Warehouse

    Schwartz, Mark W.; Cook, Carly N.; Pressey, Robert L.; Pullin, Andrew S.; Runge, Michael C.; Salafsky, Nick; Sutherland, William J.; Williamson, Matthew A.

    2018-01-01

    The practice of conservation occurs within complex socioecological systems fraught with challenges that require transparent, defensible, and often socially engaged project planning and management. Planning and decision support frameworks are designed to help conservation practitioners increase planning rigor, project accountability, stakeholder participation, transparency in decisions, and learning. We describe and contrast five common frameworks within the context of six fundamental questions (why, who, what, where, when, how) at each of three planning stages of adaptive management (project scoping, operational planning, learning). We demonstrate that decision support frameworks provide varied and extensive tools for conservation planning and management. However, using any framework in isolation risks diminishing potential benefits since no one framework covers the full spectrum of potential conservation planning and decision challenges. We describe two case studies that have effectively deployed tools from across conservation frameworks to improve conservation actions and outcomes. Attention to the critical questions for conservation project planning should allow practitioners to operate within any framework and adapt tools to suit their specific management context. We call on conservation researchers and practitioners to regularly use decision support tools as standard practice for framing both practice and research.

  15. Use of multicriteria analysis (MCA) for sustainable hydropower planning and management.

    PubMed

    Vassoney, Erica; Mammoliti Mochet, Andrea; Comoglio, Claudio

    2017-07-01

    Multicriteria analysis (MCA) is a decision-making tool applied to a wide range of environmental management problems, including renewable energy planning and management. An interesting field of application of MCA is the evaluation and analysis of the conflicting aspects of hydropower (HP) exploitation, affecting the three pillars of sustainability and involving several different stakeholders. The present study was aimed at reviewing the state of the art of MCA applications to sustainable hydropower production and related decision-making problems, based on a detailed analysis of the scientific papers published over the last 15 years on this topic. The papers were analysed and compared, focusing on the specific features of the MCA methods applied in the described case studies, highlighting the general aspects of the MCA application (purpose, spatial scale, software used, stakeholders, etc.) and the specific operational/technical features of the selected MCA technique (methodology, criteria, evaluation, approach, sensitivity, etc.). Some specific limitations of the analysed case studies were identified and a set of "quality indexes" of an exhaustive MCA application were suggested as potential improvements for more effectively support decision-making processes in sustainable HP planning and management problems. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. 40 CFR 63.10890 - What are my management practices and compliance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pollution prevention management practices for metallic scrap and mercury switches in § 63.10885 and binder... of mercury switches and a site-specific plan implementing the material specifications according to... scrap providers who participate in a program for removal of mercury switches that has been approved by...

  17. 40 CFR 63.10890 - What are my management practices and compliance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pollution prevention management practices for metallic scrap and mercury switches in § 63.10885 and binder... of mercury switches and a site-specific plan implementing the material specifications according to... scrap providers who participate in a program for removal of mercury switches that has been approved by...

  18. 40 CFR 63.10890 - What are my management practices and compliance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pollution prevention management practices for metallic scrap and mercury switches in § 63.10885 and binder... of mercury switches and a site-specific plan implementing the material specifications according to... scrap providers who participate in a program for removal of mercury switches that has been approved by...

  19. Adapting California’s ecosystems to a changing climate

    USGS Publications Warehouse

    Elizabeth Chornesky,; David Ackerly,; Paul Beier,; Frank Davis,; Flint, Lorraine E.; Lawler, Joshua J.; Moyle, Peter B.; Moritz, Max A.; Scoonover, Mary; Byrd, Kristin B.; Alvarez, Pelayo; Heller, Nicole E.; Micheli, Elisabeth; Weiss, Stuart

    2017-01-01

    Significant efforts are underway to translate improved understanding of how climate change is altering ecosystems into practical actions for sustaining ecosystem functions and benefits. We explore this transition in California, where adaptation and mitigation are advancing relatively rapidly, through four case studies that span large spatial domains and encompass diverse ecological systems, institutions, ownerships, and policies. The case studies demonstrate the context specificity of societal efforts to adapt ecosystems to climate change and involve applications of diverse scientific tools (e.g., scenario analyses, downscaled climate projections, ecological and connectivity models) tailored to specific planning and management situations (alternative energy siting, wetland management, rangeland management, open space planning). They illustrate how existing institutional and policy frameworks provide numerous opportunities to advance adaptation related to ecosystems and suggest that progress is likely to be greatest when scientific knowledge is integrated into collective planning and when supportive policies and financing enable action.

  20. Recreation impacts to cliff resources in the Potomac Gorge: Final report, June 2011

    USGS Publications Warehouse

    Marion, Jeffrey L.; Carr, C.; Davis, C.A.

    2011-01-01

    Managers of the National Park Service (NPS) are directed by law to accommodate appropriate types and amounts of visitation while ensuring that: any adverse impacts are the minimum necessary, unavoidable, cannot be further mitigated, and do not constitute impairment or derogation of park resources and values. (NPS 2006). The increasing popularity of the national park system presents substantial management challenges. High visitatation may cause unacceptable impacts to fragile natural and cultural resources, and may also cause crowding and other social impacts, which can also degrade the quality of visitor experiences. Responding to these concerns, NPS managers at Chesapeake & Ohio Canal National Historical Park (CHOH) and George Washington Memorial Parkway (GWMP) sponsored this research within the upper Potomac Gorge portions of these parks to investigate visitation-related impacts to the park?s cliff resources. The cliffs and rocky areas within the Great Falls and Mather Gorge areas provide important habitats for numerous sensitive rare plants and plant communities. A recent General Management Planning process for Great Falls Park (GFP), a portion of GWMP, highlighted the potential impacts of cliff-associated recreational activities, including hiking, climbing, and fishing, on sensitive cliff resources. The planning process identified the need for development of a Climbing Management Plan and a Trail Plan to more specifically address site and visitor management actions needed to protect rare and sensitive natural and cultural resources. Good science to assess cliff-associated rare plants and communities and to determine the existing and potential effects of cliff-related recreational activities is required for these new planning efforts. This research is designed to specifically address these informational needs and to assist park managers on both sides of the river with current and future cliff and recreation management decisions.

  1. Integrated corridor management analysis, modeling, and simulation experimental plan for the test corridor.

    DOT National Transportation Integrated Search

    2008-03-01

    This document, the AMS Experimental Plan, lays out the scope of analysis that will be conducted through the application of the AMS methodology to the Test Corridor. The specific objectives of the Experimental Plan are: create an AMS framework that id...

  2. Planning, Managing, and Financing in the 1980s. Achieving Excellence, Diversity, and Access in the Context of Stable Resources and Demands for Increased Productivity. Proceedings of the 1977 NCHEMS National Assembly (Denver, Colorado, November 6-8, 1977).

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, Boulder, CO. National Center for Higher Education Management Systems.

    The 1977 National Assembly of the National Center for Higher Education Management Systems addressed specific aspects of excellence, diversity, and access to postsecondary education and suggested ways to preserve these values in planning, managing, and financing in the 1980's. The following conference papers are presented: "Placing Value…

  3. Evaluating the impact of a disease management program for chronic complex conditions at two large northeast health plans using a control group methodology.

    PubMed

    Schwerner, Henry; Mellody, Timothy; Goldstein, Allan B; Wansink, Daryl; Sullivan, Virginia; Yelenik, Stephan N; Charlton, Warwick; Lloyd, Kelley; Courtemanche, Ted

    2006-02-01

    The objective of this study was to observe trends in payer expenditures for plan members with one of 14 chronic, complex conditions comparing one group with a disease management program specific to their condition (the intervention group) and the other with no specific disease management program (the control group) for these conditions. The authors used payer claims and membership data to identify members eligible for the program in a 12-month baseline year (October 2001 to September 2002) and a subsequent 12-month program year (October 2002 to September 2003). Two payers were analyzed: one health plan with members primarily in New Jersey (AmeriHealth New Jersey [AHNJ]), where the disease management program was offered, and one affiliated large plan with members primarily in the metro Philadelphia area, where the program was not offered. The claims payment policy for both plans is identical. Intervention and control groups were analyzed for equivalence. The analysis was conducted in both groups over identical time periods. The intervention group showed statistically significant (p < 0.01) differences in total paid claims trend and expenditures when compared to the control group. Intervention group members showed a reduction in expenditures of -8%, while control group members showed an increase of +10% over identical time periods. Subsequent analyses controlling for outliers and product lines served to confirm the overall results. The disease management program is likely responsible for the observed difference between the intervention and control group results. A well-designed, targeted disease management program offered by a motivated, supportive health plan can play an important role in cost improvement strategies for members with complex, chronic conditions.

  4. Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receivemore » credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.« less

  5. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  6. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  7. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  8. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  9. 48 CFR 36.601-4 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... engineering nature associated with design or construction of real property. (3) Other professional services of..., investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services...

  10. Phase 2 Site-Specific Fumigant Management Plans and Post-Application Summaries

    EPA Pesticide Factsheets

    New soil fumigant pesticide requirements protect handlers and other workers from exposure risks. FMP elements include application block information, tarp plan, buffer zone and sign posting requirements, air monitoring, and hazard communication.

  11. 76 FR 59156 - Notice of Availability of the Proposed Ironwood Forest National Monument Resource Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... issues, recreation, social and economic conditions, soils, wilderness characteristics, transportation and... allow recreational shooting in specific areas, and the inclusion of a shooting analysis of the planning...

  12. Patterns of service use in two types of managed behavioral health care plans.

    PubMed

    Merrick, Elizabeth L; Hodgkin, Dominic; Hiatt, Deirdre; Horgan, Constance M; Azzone, Vanessa; McCann, Bernard; Ritter, Grant; Zolotusky, Galima; McGuire, Thomas G; Reif, Sharon

    2010-01-01

    The study examined service use patterns by level of care in two managed care plans offered by a national managed behavioral health care organization (MBHO): an employee assistance program (EAP) combined with a standard behavioral health plan (integrated plan) and a standard behavioral health plan. The cross-sectional analysis used 2004 administrative data from the MBHO. Utilization of 11 specific service categories was compared. The weighted sample reflected exact matching on sociodemographic characteristics (unweighted N=710,014; weighted N=286,750). A larger proportion of enrollees in the integrated plan than in the standard plan used outpatient mental health and substance abuse office visits (including EAP visits) (p<.01) and substance abuse intensive outpatient or day treatment (p<.05), and the proportion using residential substance abuse rehabilitation was lower (p<.05). The integrated and standard products had distinct utilization patterns in this large MBHO. In particular, greater use of certain outpatient services was observed in the integrated plan.

  13. Discharge planning, nursing home placement, and the Internet.

    PubMed

    Collier, Eric J; Harrington, Charlene

    2005-01-01

    Effective discharge planning and well-coordinated case management related to nursing home (NH) placement are key services in acute-care hospitals. (1) identify the individuals and important factors involved in the discharge planning process; (2) describe the types/sources of information used by discharge planners to recommend specific nursing homes for patients and families; and (3) determine which methods are used to evaluate the quality of US nursing homes (NHs). Descriptive study, with a convenience sample of 41 discharge planners and case managers from California acute-care hospitals. This study found that patients, families, friends, and physicians are all involved in the discharge planning process along with discharge planners and/or case managers. Discharge planners/case managers were generally concerned about NH bed availability, geographic location, and financial considerations. Although the discharge planners and case managers were able to articulate important indicators of quality in NHs, such information was not routinely considered during discharge planning activities. Discharge planners and case managers need to play a more central role in the decision-making process related to the selection of a NH, especially because decisions are time-limited and can benefit from a well-planned discharge planning program that uses a variety of data on quality and costs. The widespread use of Internet-based information sources can be expanded to aid this process.

  14. 32 CFR 644.504 - Disposal plan for timber.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... merchantable dead timber will be marked for cutting in accordance with the land management plan, Master Plan, or forestry supplement thereto, and cutting will be limited to the timber so marked. The disposal... affecting the installations, and the requirements of such measures will be set forth specifically. (e) Any...

  15. Typology and indicators of ecosystem services for marine spatial planning and management.

    PubMed

    Böhnke-Henrichs, Anne; Baulcomb, Corinne; Koss, Rebecca; Hussain, S Salman; de Groot, Rudolf S

    2013-11-30

    The ecosystem services concept provides both an analytical and communicative tool to identify and quantify the link between human welfare and the environment, and thus to evaluate the ramifications of management interventions. Marine spatial planning (MSP) and Ecosystem-based Management (EBM) are a form of management intervention that has become increasingly popular and important globally. The ecosystem service concept is rarely applied in marine planning and management to date which we argue is due to the lack of a well-structured, systematic classification and assessment of marine ecosystem services. In this paper we not only develop such a typology but also provide guidance to select appropriate indicators for all relevant ecosystem services. We apply this marine-specific ecosystem service typology to MSP and EBM. We thus provide not only a novel theoretical construct but also show how the ecosystem services concept can be used in marine planning and management. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Does performance management affect nurses' well-being?

    PubMed

    Decramer, Adelien; Audenaert, Mieke; Van Waeyenberg, Thomas; Claeys, Tine; Claes, Claudia; Vandevelde, Stijn; van Loon, Jos; Crucke, Saskia

    2015-04-01

    This article focuses on employee performance-management practices in the healthcare sector. We specifically aim to contribute to a better understanding of the impact of employee performance-management practices on affective well-being of nurses in hospitals. Theory suggests that the features of employee-performance management (planning and evaluation of individual performances) predict affective well-being (in this study: job satisfaction and affective commitment). Performance-management planning and evaluation and affective well-being were drawn from a survey of nurses at a Flemish hospital. Separate estimations were performed for different aspects of affective well-being. Performance planning has a negative effect on job satisfaction of nurses. Both vertical alignment and satisfaction with the employee performance-management system increase the affective well-being of nurses; however, the impact of vertical alignment differs for different aspects of affective well-being (i.e. job satisfaction and affective commitment). Performance-management planning and evaluation of nurses are associated with attitudinal outcomes. The results indicate that employee performance-management features have different impacts on different aspects of well-being. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Species distributions models in wildlife planning: agricultural policy and wildlife management in the great plains

    USGS Publications Warehouse

    Fontaine, Joseph J.; Jorgensen, Christopher; Stuber, Erica F.; Gruber, Lutz F.; Bishop, Andrew A.; Lusk, Jeffrey J.; Zach, Eric S.; Decker, Karie L.

    2017-01-01

    We know economic and social policy has implications for ecosystems at large, but the consequences for a given geographic area or specific wildlife population are more difficult to conceptualize and communicate. Species distribution models, which extrapolate species-habitat relationships across ecological scales, are capable of predicting population changes in distribution and abundance in response to management and policy, and thus, are an ideal means for facilitating proactive management within a larger policy framework. To illustrate the capabilities of species distribution modeling in scenario planning for wildlife populations, we projected an existing distribution model for ring-necked pheasants (Phasianus colchicus) onto a series of alternative future landscape scenarios for Nebraska, USA. Based on our scenarios, we qualitatively and quantitatively estimated the effects of agricultural policy decisions on pheasant populations across Nebraska, in specific management regions, and at wildlife management areas. 

  18. Using of New Management Approaches in the Field of Personal Marketing in the Transport Company

    NASA Astrophysics Data System (ADS)

    Matusova, Dominika; Gogolova, Martina

    2017-10-01

    Personal marketing is a relatively new field in the theory and practice of human resources (HR) activities in the corporate and business sector. As a separate area of HR management was established of the earmarking of personnel management. In the article is mentioned about the facility manager. This position introduces a specific category - behaviour of manager. The facility manager has to dispose the skills from the areas: operation and maintenance, property, facility management processes, human factors of environment, planning, function devices, finance and quality management and innovation and communication. In the article is described the situation in transport company, specifically - Railway Company Slovakia, Inc. (ZSSK). Employees of the company works in departments as: managers, sellers, operators for services and maintenance, economists and controllers. The transport company had 5949 employees in 2015. That was about 108 employees more than the previous year. Facility manager and the company, set the targets which want to achieve within the planned time. Beyond the objectives are fundamental the values of company, business vision and mission.

  19. Feasibility study of a pressure-fed engine for a water recoverable space shuttle booster. Volume 3, part 1: Program acquisition planning

    NASA Technical Reports Server (NTRS)

    Olsen, C. D.

    1972-01-01

    Planning documentation is presented covering the specific areas of project engineering and development, management, facilities, manufacturing, logistic support maintenance, and test and product assurance.

  20. Scientific information and the Tongass land management plan: key findings derived from the scientific literature, species assessments, resource analyses, workshops, and risk assessment panels.

    Treesearch

    Douglas N. Swanston; Charles G. Shaw; Winston P. Smith; Kent R. Julin; Guy A. Cellier; Fred H. Everest

    1996-01-01

    This document highlights key items of information obtained from the published literature and from specific assessments, workshops, resource analyses, and various risk assessment panels conducted as part of the Tongass land management planning process. None of this information dictates any particular decision; however, it is important to consider during decisionmaking...

  1. Using canonical correlation analysis to identify environmental attitude groups: Considerations for national forest planning in the southwestern U.S

    Treesearch

    Alejandro J. Prera; Kristine M. Grimsrud; Jennifer A. Thacher; Dan W. McCollum; Robert P. Berrens

    2014-01-01

    As public land management agencies pursue region-specific resource management plans, with meaningful consideration of public attitudes and values, there is a need to characterize the complex mix of environmental attitudes in a diverse population. The contribution of this investigation is to make use of a unique household, mail/ internet survey data set collected in...

  2. An Approach and Instrumentation for Management System Analysis

    DTIC Science & Technology

    1974-10-01

    Benefit Analysis Systems Analysis Manpower Planning Resource Planning Information Theory 20. ABSTRACT (Conlliwa on ravaraa alda It nacaaaary...participants the data necessary to trace both formal and informal information flows and make cost- benefit judgments about specific communications. The...network within a manage- ment structure and to provide a basis tor preliminary cost- benefit evaluations. This objective was in response to Phase I of the

  3. Planning, Organizing, and Conducting a 2-Week Study Abroad Trip for Undergraduate Students: Guidelines for First-Time Faculty

    ERIC Educational Resources Information Center

    Koernig, Stephen K.

    2007-01-01

    This article provides specific recommendations to help faculty members organize, plan, and conduct a short-term overseas study tour. Specifically, strategies are presented to help with managing student anxiety in the pretrip sessions, acclimating the students to their new environment in the early part of the trip, balancing academic content with…

  4. Marketing Nature-Oriented Tourism or Rural Development and Wildlands Management in Developing Countries: A Bibliography

    Treesearch

    C. Denise Ingram; Patrick B. Durst

    1987-01-01

    Annotated bibliography that specifically links tourism marketing and wildlands management. The bibliography is divided into five sections: Information Sources, Wildlands Management, Planning and Development, Tourism Impacts, Marketing and Promotion.Indexed by author and geographical location.

  5. DMPTool: New Guidance, Resources, and Outreach for Quality Data Management Plans

    NASA Astrophysics Data System (ADS)

    Cruse, P.; Sallans, A.

    2013-12-01

    A growing number of US federal funding agencies require data management plans (DMP) as part of new research grant proposals. To help researchers with this requirement, several organizations (the California Digital Library, University of Illinois, University of Virginia, Smithsonian Institution, the DataONE consortium and the (UK) Digital Curation Centre) came together to develop the DMPTool in 2011. The goal of the DMPTool is to provide researchers with guidance, links to resources and help with writing data management plans. Thanks to a grant from the Alfred P. Sloan Foundation, these organizations have been able to develop DMPTool2, adding new features and functionality, while aiming to grow the number of users and funding requirements and build a community around DMP best practices. Researchers create plans in the tool by selecting their desired funding agency. The tool provides specific requirements from the selected agency as well as detailed help with each area of the plan. Users have access to complete DMP life cycle management, tracking changes through creation, editing, submission, evaluation, and publication. They may also perform enhanced keyword searches and view publicly available plans. With role-based user authorization, users may hold various roles within the interface: creators, collaborators, institutional administrators, and tool administrators. Furthermore, partner institutions can add significant value to the process with several special tool features. Along with institutional branding in the interface, they can provide links to resources they provide to users, such as to preservation repositories, consultation services, or news and event items. In addition, partner institutions can provide help with specific plan questions, and even suggest responses. Institutional administrators can also mine data on plans in order to better support researchers. Institutions may be represented in different roles: as a funder, a researcher's affiliate, or as an institution with its own DMP requirements.

  6. Dengue Contingency Planning: From Research to Policy and Practice.

    PubMed

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J; Sánchez Tejeda, Gustavo; Lloyd, Linda S; Hakim, Lokman; Bowman, Leigh R; Horstick, Olaf; Coelho, Giovanini

    2016-09-01

    Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan.

  7. Training hospital managers for strategic planning and management: a prospective study.

    PubMed

    Terzic-Supic, Zorica; Bjegovic-Mikanovic, Vesna; Vukovic, Dejana; Santric-Milicevic, Milena; Marinkovic, Jelena; Vasic, Vladimir; Laaser, Ulrich

    2015-02-26

    Training is the systematic acquisition of skills, rules, concepts, or attitudes and is one of the most important components in any organization's strategy. There is increasing demand for formal and informal training programs especially for physicians in leadership positions. This study determined the learning outcomes after a specific training program for hospital management teams. The study was conducted during 2006 and 2007 at the Centre School of Public Health and Management, Faculty of Medicine, University of Belgrade and included 107 participants involved in the management in 20 Serbian general hospitals. The management teams were multidisciplinary, consisting of five members on average: the director of the general hospital, the deputy directors, the head nurse, and the chiefs of support services. The managers attended a training program, which comprised four modules addressing specific topics. Three reviewers independently evaluated the level of management skills at the beginning and 12 months after the training program. Principal component analysis and subsequent stepwise multiple linear regression analysis were performed to determine predictors of learning outcomes. The quality of the SWOT (strengths, weaknesses, opportunities and threats) analyses performed by the trainees improved with differences between 0.35 and 0.49 on a Likert scale (p < 0.001). Principal component analysis explained 81% of the variance affecting their quality of strategic planning. Following the training program, the external environment, strategic positioning, and quality of care were predictors of learning outcomes. The four regression models used showed that the training program had positive effects (p < 0.001) on the ability to formulate a Strategic Plan comprising the hospital mission, vision, strategic objectives, and action plan. This study provided evidence that training for strategic planning and management enhanced the strategic decision-making of hospital management teams, which is a requirement for hospitals in an increasingly competitive, complex and challenging context. For the first time, half of state general hospitals involved in team training have formulated the development of an official strategic plan. The positive effects of the formal training program justify additional investment in future education and training.

  8. Challenges and opportunities in patient-specific, motion-managed and PET/CT-guided radiation therapy of lung cancer: review and perspective

    PubMed Central

    2012-01-01

    The increasing interest in combined positron emission tomography (PET) and computed tomography (CT) to guide lung cancer radiation therapy planning has been well documented. Motion management strategies during treatment simulation PET/CT imaging and treatment delivery have been proposed to improve the precision and accuracy of radiotherapy. In light of these research advances, why has translation of motion-managed PET/CT to clinical radiotherapy been slow and infrequent? Solutions to this problem are as complex as they are numerous, driven by large inter-patient variability in tumor motion trajectories across a highly heterogeneous population. Such variation dictates a comprehensive and patient-specific incorporation of motion management strategies into PET/CT-guided radiotherapy rather than a one-size-fits-all tactic. This review summarizes challenges and opportunities for clinical translation of advances in PET/CT-guided radiotherapy, as well as in respiratory motion-managed radiotherapy of lung cancer. These two concepts are then integrated into proposed patient-specific workflows that span classification schemes, PET/CT image formation, treatment planning, and adaptive image-guided radiotherapy delivery techniques. PMID:23369522

  9. From weight management goals to action planning: identification of a logical sequence from goals to actions and underlying determinants.

    PubMed

    van Genugten, L; van Empelen, P; Oenema, A

    2012-08-01

    Weight gain prevention (WGP) among adults who are overweight is an important target in the prevention of obesity. However, little is known about the process from WGP as a goal to successful weight-management. The present study aimed to: (i) gain more insight into this process; (ii) identify cognitive predictors of intention for WGP; and (iii) examine WGP as a potential predictor for the intention to change weight-related behaviours [dietary intake (DI) and physical activity (PA)] and specific action planning. In this cross-sectional study, overweight adults [n = 510; body mass index 25-30 kg m(-2); mean (SD) age 48 (9.5) years; 30.8% male] completed an online questionnaire, assessing goal intention for WGP, behavioural intention for DI and PA, planning for change in DI and PA and socio-cognitive correlates. Ordinal regression analyses were used to analyse the data. In 89% of the sample, (parts of) the proposed sequence from goal intention (for WGP), behavioural intention (for DI/PA) and planning (for DI/PA) was observed. Attitude, social norm and perceived control towards WGP, and perceived weight status and risk perception, were associated with intention for WGP. Behaviour-specific perceived control and preferences were more strongly associated with intention to change DI or PA and planning for change than intention for WGP was. Intention for WGP is important in the process toward weight-management because, for most people, intention for WGP precedes behavioural intention, which precedes planning. Intention for WGP is associated with behavioural intention but behaviour-specific factors are the strongest correlates of behavioural intention and planning. © 2012 The Authors. Journal of Human Nutrition and Dietetics © 2012 The British Dietetic Association Ltd.

  10. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  11. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Shane

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  12. Long Range Plan for Information Systems from the State Board of Education.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    The Information Systems Long Range Plan specifically addresses Goal four of the Texas State Board of Education's (SBOE's) "Long-Range Plan for Public School Education" dealing with efficient management and organization of the educational system. To facilitate this goal, the SBOE in 1986 approved and directed the Texas Education Agency to…

  13. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  14. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  15. 49 CFR 611.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following definitions apply: Alternatives analysis is a corridor level analysis which evaluates all... should include transit improvements lower in cost than the new start which result in a better ratio of... preparation of final construction plans (including construction management plans), detailed specifications...

  16. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  17. Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2014-01-01

    North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...

  18. Natural Resource Management Plan for Brookhaven National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    green, T.

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by themore » Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in significant changes to this plan warranting the delay. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B, respectively), and lists of actions in tabular format - including completed items as well as ongoing and new action items (Appendices C and D, respectively).« less

  19. APPLICATION OF EMAP METHODS AND INDICATORS TO THE NY/NJ HARBOR

    EPA Science Inventory

    The Comprehensive Conservation and Management Plan (CCMP) for the NY/NJ Harbor requires specific management actions to maintain and restore the Harbor environment. It also specifies that the progress of these management actions on the improvement of sediment quality and biologic...

  20. Management strategies in hospitals: scenario planning.

    PubMed

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  1. The role of promotion in alcoholism treatment marketing.

    PubMed

    Jones, M A; Self, D R; Owens, C A; Kline, T A

    1988-01-01

    This article is an overview of the promotion function as a part of the ATM's marketing mix. It approaches various promotion decision areas from a managerial perspective, focusing upon some key components of promotion planning. Rather than provide specific operational or implementation details (how to write a brochure) it is more conceptual in nature and offers a framework for promotion planners. The article addresses promotion management, promotion objectives, analysis for promotion planning, the promotion mix, and addresses the benefits and limitations of some specific promotion tools available to the ATM manager. It treats ATMs as a service and reveals specific implications for promotion strategy dictated by services. The article also reports promotion tools employed by Alabama ATMs citing data from the Alabama study.

  2. 78 FR 41914 - Caribbean Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-12

    ... Island-Specific Fishery Management Plans for Puerto Rico and the U.S. Virgin Islands: Action 1: Establish... group for discussion, those issues may not be subjects for formal action during this meeting. Actions...

  3. Writing a group practice business plan.

    PubMed

    Reiboldt, J M

    1999-07-01

    A business plan offers group practices a blueprint to accomplish a variety of goals, such as securing capital, marketing the practice's services, recruiting new employees, developing a strategic plan or a budget, or planning for growth. A business plan should be informative, specific, and visionary. Elements that every business plan should address are a mission statement, strategy, planning, management information, and action scheme. A business plan should include certain information in a prescribed order. By writing a realistic business plan, group practices can work more efficiently and minimize the risk of not meeting their financial projections.

  4. Management and Accounting in English Higher Education Influenced by Environmental and Academia-Specific Factors

    ERIC Educational Resources Information Center

    von Alberti-Alhtaybat, Larissa; Al-Htaybat, Khaldoon; Hutaibat, Khaled

    2012-01-01

    This article originates from a longitudinal study of management and accounting practices in the English higher education sector. The processes of strategic management and strategic management accounting in several English higher education institutions were investigated, from planning to assessment, and their meaning to members of staff. The study…

  5. The integrated rangeland fire management strategy actionable science plan

    USGS Publications Warehouse

    Aldridge, Cameron L.; Berg, Ken; Boyd, Chad S.; Boyte, Stephen P.; Bradford, John B.; Brunson, Ed; Cissel, John H.; Conway, Courtney J.; Chalfoun, Anna D.; Chambers, Jeanne C.; Clark, Patrick; Coates, Peter S.; Crist, Michele R.; Davis, Dawn M.; DeCrappeo, Nicole; Deibert, Patricia A.; Doherty, Kevin E.; Evers, Louisa B.; Finch, Deborah M.; Finn, Sean P.; Germino, Matthew J.; Glenn, Nancy F.; Gucker, Corey; Hall, John A.; Hanser, Steven E.; Havlina, Douglas W.; Heinrichs, Julie; Heller, Matt; Homer, Collin G.; Hunter, Molly E.; Jacobs, Ruth W.; Karl, Jason W.; Kearney, Richard; Kemp, Susan K; Kilkenny, Francis F.; Knick, Steven T.; Launchbaugh, Karen; Manier, Daniel J.; Mayer, Kenneth E.; Meyer, Susan E.; Monroe, Adrian; MontBlanc, Eugénie; Newingham, Beth A.; Pellant, Michael L.; Phillips, Susan L.; Pilliod, David S.; Ricca, Mark A.; Richardson, Bryce A.; Rose, Jeffrey A.; Shaw, Nancy; Sheley, Roger L.; Shinneman, Douglas J.; Wiechman , Lief A.; Wylie, Bruce K.

    2016-01-01

    The Integrated Rangeland Fire Management Strategy (hereafter Strategy, DOI 2015) outlined the need for coordinated, science-based adaptive management to achieve long-term protection, conservation, and restoration of the sagebrush (Artemisia spp.) ecosystem. A key component of this management approach is the identification of knowledge gaps that limit implementation of effective strategies to meet current management challenges. The tasks and actions identified in the Strategy address several broad topics related to management of the sagebrush ecosystem. This science plan is organized around these topics and specifically focuses on fire, invasive plant species and their effects on altering fire regimes, restoration, sagebrush and greater sage-grouse (Centrocercus urophasianus), and climate and weather.

  6. Evaluation of Integrated Coastal Zone Management Plan Practices in the Turkish Case

    NASA Astrophysics Data System (ADS)

    Doruk Özügül, M.; Yerliyurt, Bora; Seçilmişler, Töre

    2017-10-01

    In terms of both international and national contexts, mostly coastal zones are the place of complexity, vulnerability and competition, so that they have to be well-planned and managed. Diversity in users, land uses, investments, sectoral plans and policies make coastal areas highly complex and problematic zones where competition also takes place. Unless these dimensions of pressure aren’t balanced with precautionary actions, coastal zones transform into more vulnerable geographies. Within this context “Integrated Coastal Zone Management (ICZM) Plan” appears as a major tool where “integration” becomes a vital keyword for such diversifying environments. This integration challenge covers sectoral, administrative, spatial, interdisciplinary (in terms of scientific research fields) and internationality dimensions. A set of basic principles could also be obtained from the literature in order to reach a better ICZM Plan practice. These could be summarized as; “a broader perspective”, “a long-term perspective”, “adaptive management and monitoring”, “local specificities, specific solutions and flexible measures”, “carrying capacity of ecosystems”, “a participatory process”, “well coordination of policies and partners” and “coherence between sectoral policy objectives, planning and management”. A similar problematic conceptualization is also viable for Turkey, where approximately 76% of the total border length and 27 of 81 provinces are coastal. Naturally, both ICZM and coastal zone planning are within the emerging planning issues of national agenda. The purpose of this paper is to examine the Turkish practices depending on the above-mentioned principles by comparing various official ICZM plans of selected provinces. As a general conclusion it is seen that ICZM -to be an integrative and multi-dimensional tool- is contextually misunderstood. From this perspective “the determination of the plan borders”, “unsuitability of the plan contents with the ideal ICZM plans” and “absence of legal basis” could be defined as the major discussion topics which reflect the dilemmas of ICZM practice in the Turkish case.

  7. The Case for Case-Mix: A New Construct for Hospital Management

    PubMed Central

    Plomann, Marilyn Peacock; Garzino, Fred R.

    1981-01-01

    Case-mix is a useful methodology for health care management, planning and control. It provides managers with a powerful tool by providing a framework for relating resource consumption profiles with specific treatment patterns. In the long run, it will assist hospital planners in analyzing the demands which different classes of patients bring to the hospital. Decisions concerning capital financing, facilities planning, new services, and the medical and financial implications of physician activities are more efficiently analyzed within a case-mix framework. In the near term, inventory management, staffing policies and the on-going need for the astute management of cash flow will be postively and decisively affected by the use of case-mix measures. The benefits derived from a case-mix system are not limited to hospitals possessing sophisticated management information systems. The case-mix methodology also provides a useful tool for hospitals with less advanced data processing systems and management practices in applying a variety of management science techniques to their planning and control activities.

  8. NASA software documentation standard software engineering program

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The NASA Software Documentation Standard (hereinafter referred to as Standard) can be applied to the documentation of all NASA software. This Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. This basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

  9. Integrated Employee Assistance Program/Managed Behavioral Healthcare Benefits: Relationship with Access and Client Characteristics

    PubMed Central

    Merrick, Elizabeth S. Levy; Hodgkin, Dominic; Horgan, Constance M.; Hiatt, Deirdre; McCann, Bernard; Azzone, Vanessa; Zolotusky, Galina; Ritter, Grant; Reif, Sharon; McGuire, Thomas G.

    2009-01-01

    This study examined service user characteristics and determinants of access for enrollees in integrated EAP/behavioral health versus standard managed behavioral health care plans. A national managed behavioral health care organization’s claims data from 2004 were used. Integrated plan service users were more likely to be employees rather than dependents, and to be diagnosed with adjustment disorder. Logistic regression analyses found greater likelihood in integrated plans of accessing behavioral health services (OR 1.20, CI 1.17–1.24), and substance abuse services specifically (OR 1.23, CI 1.06–1.43). Results are consistent with the concept that EAP benefits may increase access and address problems earlier. PMID:19690952

  10. Integrated employee assistance program/managed behavioral health care benefits: relationship with access and client characteristics.

    PubMed

    Levy Merrick, Elizabeth S; Hodgkin, Dominic; Horgan, Constance M; Hiatt, Deirdre; McCann, Bernard; Azzone, Vanessa; Zolotusky, Galina; Ritter, Grant; Reif, Sharon; McGuire, Thomas G

    2009-11-01

    This study examined service user characteristics and determinants of access for enrollees in integrated EAP/behavioral health versus standard managed behavioral health care plans. A national managed behavioral health care organization's claims data from 2004 were used. Integrated plan service users were more likely to be employees rather than dependents, and to be diagnosed with adjustment disorder. Logistic regression analyses found greater likelihood in integrated plans of accessing behavioral health services (OR 1.20, CI 1.17-1.24), and substance abuse services specifically (OR 1.23, CI 1.06-1.43). Results are consistent with the concept that EAP benefits may increase access and address problems earlier.

  11. 77 FR 70994 - Proposed Information Collection; Comment Request; Gulf of Mexico Fishery Management Council...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ... Collection; Comment Request; Gulf of Mexico Fishery Management Council Stakeholder Communication Survey... Gulf of Mexico Fishery Management Council (Council) has adopted a five-year strategic communications plan that requires the Communications staff to not only implement specific outreach and education...

  12. Integrated Data & Analysis in Support of Informed and Transparent Decision Making

    NASA Astrophysics Data System (ADS)

    Guivetchi, K.

    2012-12-01

    The California Water Plan includes a framework for improving water reliability, environmental stewardship, and economic stability through two initiatives - integrated regional water management to make better use of local water sources by integrating multiple aspects of managing water and related resources; and maintaining and improving statewide water management systems. The Water Plan promotes ways to develop a common approach for data standards and for understanding, evaluating, and improving regional and statewide water management systems, and for common ways to evaluate and select from alternative management strategies and projects. The California Water Plan acknowledges that planning for the future is uncertain and that change will continue to occur. It is not possible to know for certain how population growth, land use decisions, water demand patterns, environmental conditions, the climate, and many other factors that affect water use and supply may change by 2050. To anticipate change, our approach to water management and planning for the future needs to consider and quantify uncertainty, risk, and sustainability. There is a critical need for information sharing and information management to support over-arching and long-term water policy decisions that cross-cut multiple programs across many organizations and provide a common and transparent understanding of water problems and solutions. Achieving integrated water management with multiple benefits requires a transparent description of dynamic linkages between water supply, flood management, water quality, land use, environmental water, and many other factors. Water Plan Update 2013 will include an analytical roadmap for improving data, analytical tools, and decision-support to advance integrated water management at statewide and regional scales. It will include recommendations for linking collaborative processes with technical enhancements, providing effective analytical tools, and improving and sharing data and information. Specifically, this includes achieving better integration and consistency with other planning activities; obtaining consensus on quantitative deliverables; building a common conceptual understanding of the water management system; developing common schematics of the water management system; establishing modeling protocols and standards; and improving transparency and exchange of Water Plan information.

  13. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laney, T.

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less

  14. Triple Science GCSEs: Curriculum Planning and Design. GCSEs in Biology, Chemistry and Physics

    ERIC Educational Resources Information Center

    Morris, Pam; Quill, John

    2007-01-01

    This publication will provide managers and others with practical advice on how to plan, develop and model the Triple Science requirement, taking into account all the critical factors that need to be considered. This guidance concentrates on curriculum planning and design, including the use of the new (2006) specifications to provide Triple Science…

  15. Environmentally Sound Small-Scale Livestock Projects. Guidelines for Planning Series Number 5.

    ERIC Educational Resources Information Center

    Jacobs, Linda

    This document was developed in response to the need for simplified technical information for planning environmentally sound small-scale projects in third world countries. It is aimed specifically at those who are planning or managing small-scale livestock projects in less-developed areas of the tropics and sub-tropics. The guidelines included in…

  16. Pediatric issues in disaster management, Part 1: the emergency medical system and surge capacity.

    PubMed

    Mace, Sharon E; Sharieff, Ghazala; Bern, Andrew; Benjamin, Lee; Burbulys, Dave; Johnson, Ramon; Schreiber, Merritt

    2010-01-01

    Although children and infants are likely to be victims in a disaster and are more vulnerable in a disaster than adults, disaster planning and management has often overlooked the specific needs of pediatric patients. The authors discuss key components of disaster planning and management for pediatric patients, including emergency medical services, hospital/facility issues, evacuation centers, family separation/reunification, children with special healthcare needs (SHCNs), mental health issues, and overcrowding/surge capacity. Specific policy recommendations and an appendix with detailed practical information and algorithms are included. The first part of this three-part series on pediatric issues in disaster management addresses the emergency medical system from the field to the hospital and surge capacity including the impact of crowding. The second part addresses the appropriate setup and functioning of evacuation centers and family separation and reunification. The third part deals with special patient populations: children with SHCNs and mental health issues.

  17. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetationmore » of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.« less

  18. The Method of Multiple Spatial Planning Basic Map

    NASA Astrophysics Data System (ADS)

    Zhang, C.; Fang, C.

    2018-04-01

    The "Provincial Space Plan Pilot Program" issued in December 2016 pointed out that the existing space management and control information management platforms of various departments were integrated, and a spatial planning information management platform was established to integrate basic data, target indicators, space coordinates, and technical specifications. The planning and preparation will provide supportive decision support, digital monitoring and evaluation of the implementation of the plan, implementation of various types of investment projects and space management and control departments involved in military construction projects in parallel to approve and approve, and improve the efficiency of administrative approval. The space planning system should be set up to delimit the control limits for the development of production, life and ecological space, and the control of use is implemented. On the one hand, it is necessary to clarify the functional orientation between various kinds of planning space. On the other hand, it is necessary to achieve "multi-compliance" of various space planning. Multiple spatial planning intergration need unified and standard basic map(geographic database and technical specificaton) to division of urban, agricultural, ecological three types of space and provide technical support for the refinement of the space control zoning for the relevant planning. The article analysis the main space datum, the land use classification standards, base map planning, planning basic platform main technical problems. Based on the geographic conditions, the results of the census preparation of spatial planning map, and Heilongjiang, Hainan many rules combined with a pilot application.

  19. 78 FR 46897 - Fisheries of the Northeastern United States; Atlantic Herring Fishery; Framework Adjustment 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ...NMFS proposes regulations to implement Framework Adjustment 2 to the Atlantic herring Fishery Management Plan and the 2013-2015 fishery specifications for the Atlantic herring fishery. Framework 2 would allow the New England Fishery Management Council to split annual catch limits seasonally for the four Atlantic herring management areas, and the carryover of unharvested catch, up to 10 percent for each area's annual catch limit. The specifications would set catch specifications for the herring fishery for the 2013-2015 fishing years and would establish seasonal splits for management areas 1A and 1B as recommended to NMFS by the New England Fishery Management Council.

  20. Issues in Planning and Implementing National Literacy Programmes.

    ERIC Educational Resources Information Center

    Carron, G., Ed.; Bordia, A., Ed.

    The following papers were produced by participants and resource persons on specific issues of planning, management and implementation of literacy and post-literacy strategies: "People's Participation and Mobilization: Characteristics of the Literacy Campaigns in China" (Yanwei); "Strategies for Mobilization and Participation of…

  1. 76 FR 69707 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... implementation of Ecosystem Based Fishery Management. A specific topic to be discussed will be the Council plan for moving forward with the development of ecosystem based fishery management approach in 2012. In... final topic to be discussed will be potential revisions to the Council's Statement of Organization...

  2. 76 FR 16595 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... United States; Atlantic Sea Scallop Fishery; Amendment 15 to the Atlantic Sea Scallop Fishery Management... Amendment 15 to the Atlantic Sea Scallop Fishery Management Plan (FMP) (Amendment 15), incorporating the... basis for scallop fishery specifications, including days-at-sea, access area trip allocations, and IFQs...

  3. 75 FR 37739 - Fisheries of the Northeastern United States; Atlantic Mackerel, Squid, and Butterfish Fisheries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    .... This action complies with the 2010 Specifications and Management Measures for the Atlantic Mackerel, Squid, and Butterfish Fisheries Management Plan, which modified accounting procedures for underages of... FURTHER INFORMATION CONTACT: Lindsey Feldman, Fishery Management Specialist, 978-675-2179, Fax 978-281...

  4. Medical management of youth baseball and softball tournaments.

    PubMed

    Kanaan, Matthew; Ray, Tracy R

    2013-01-01

    The medical management of youth baseball and softball tournaments requires both proper planning and a basic awareness of commonly seen sport-specific injuries. While youth sporting events are designed to be a fun experience for all, injuries and emergencies will occur. With proper planning, and supplies, the impact of these issues can be minimized. This article will outline some basic principles for the medical personnel that may be involved in youth baseball and softball events.

  5. Utility and Scope of Rapid Prototyping in Patients with Complex Muscular Ventricular Septal Defects or Double-Outlet Right Ventricle: Does it Alter Management Decisions?

    PubMed

    Bhatla, Puneet; Tretter, Justin T; Ludomirsky, Achi; Argilla, Michael; Latson, Larry A; Chakravarti, Sujata; Barker, Piers C; Yoo, Shi-Joon; McElhinney, Doff B; Wake, Nicole; Mosca, Ralph S

    2017-01-01

    Rapid prototyping facilitates comprehension of complex cardiac anatomy. However, determining when this additional information proves instrumental in patient management remains a challenge. We describe our experience with patient-specific anatomic models created using rapid prototyping from various imaging modalities, suggesting their utility in surgical and interventional planning in congenital heart disease (CHD). Virtual and physical 3-dimensional (3D) models were generated from CT or MRI data, using commercially available software for patients with complex muscular ventricular septal defects (CMVSD) and double-outlet right ventricle (DORV). Six patients with complex anatomy and uncertainty of the optimal management strategy were included in this study. The models were subsequently used to guide management decisions, and the outcomes reviewed. 3D models clearly demonstrated the complex intra-cardiac anatomy in all six patients and were utilized to guide management decisions. In the three patients with CMVSD, one underwent successful endovascular device closure following a prior failed attempt at transcatheter closure, and the other two underwent successful primary surgical closure with the aid of 3D models. In all three cases of DORV, the models provided better anatomic delineation and additional information that altered or confirmed the surgical plan. Patient-specific 3D heart models show promise in accurately defining intra-cardiac anatomy in CHD, specifically CMVSD and DORV. We believe these models improve understanding of the complex anatomical spatial relationships in these defects and provide additional insight for pre/intra-interventional management and surgical planning.

  6. Patient-specific distal radius locking plate for fixation and accurate 3D positioning in corrective osteotomy.

    PubMed

    Dobbe, J G G; Vroemen, J C; Strackee, S D; Streekstra, G J

    2014-11-01

    Preoperative three-dimensional planning methods have been described extensively. However, transferring the virtual plan to the patient is often challenging. In this report, we describe the management of a severely malunited distal radius fracture using a patient-specific plate for accurate spatial positioning and fixation. Twenty months postoperatively the patient shows almost painless reconstruction and a nearly normal range of motion.

  7. Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding themore » enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.« less

  8. [Occupational health protection in business economics--business plan for health intervention].

    PubMed

    Rydlewska-Liszkowska, Izabela

    2011-01-01

    One of the company's actions for strengthening human capital is the protection of health and safety of its employees. Its implementation needs financial resources, therefore, employers expect tangible effectiveness in terms of health and economics. Business plan as an element of company planning can be a helpful tool for new health interventions management. The aim of this work was to elaborate a business plan framework for occupational health interventions at the company level, combining occupational health practices with company management and economics. The business plan of occupational health interventions was based on the literature review, the author's own research projects and meta-analysis of research reports on economic relations between occupational health status and company productivity. The study resulted in the development of the business plan for occupational health interventions at the company level. It consists of summary and several sections that address such issues as the key elements of the intervention discussed against a background of the company economics and management, occupational health and safety status of the staff, employees' health care organization, organizational plan of providing the employees with health protection, marketing plan, including specificity of health interventions in the company marketing plan and financial plan, reflecting the economic effects of health care interventions on the overall financial management of the company. Business plan defines occupational health and safety interventions as a part of the company activities as a whole. Planning health care interventions without relating them to the statutory goals of the company may have the adverse impact on the financial balance and profitability of the company. Therefore, business plan by providing the opportunity of comparing different options of occupational health interventions to be implemented by employers is a key element of the management of employees' health.

  9. Preventing readmissions through comprehensive discharge planning.

    PubMed

    Hunter, Tabitha; Nelson, James Rex; Birmingham, Jackie

    2013-01-01

    Case managers, including nurses and social workers, provide essential services to hospitalized patients, including mandated discharge planning that has been shown to impact patient safety and patient outcomes. The heightened attention to readmission is evident in both reimbursement and accreditation initiatives. The Centers for Medicare & Medicaid Services, Office of Clinical Standards & Quality/Survey & Certification Group, is revising worksheets to be used by surveyors to review how hospitals are complying with the Medicare Conditions of Participation with a focus on discharge planning as it relates to patient safety. This is an opportunity for case managers to apply the principles of case management to the targeted problem of readmissions. Now case managers must identify the reasons for readmission on a patient-by-patient basis, collect data, analyze processes, and then change practice in the hospital and work more closely with community-based providers. The purpose of this article is to recommend improvement in a consistent case management practice that will positively influence patient readmissions. Hospital-based case managers who are responsible for discharge planning functions. Hospital administrators will also find this information valuable as a tool to assess strategies to control preventable readmissions and to comply with the Medicare Conditions of Participation for discharge planning. Hospital-based case managers, responsible for discharge planning, have a unique opportunity to interact face-to-face with patients who are readmitted to determine factors that lead to the readmission. Case managers need to change their practice to include assessing patients on the basis of their prior level of care. Pharmacists need to play a bigger role in discharge planning, especially for patients who have experienced a potentially avoidable readmission. Working closely with community-based providers is essential to target reasons for readmission. The Medicare Conditions of Participation for Discharge Planning can be used not only to show compliance but as tools to evaluate current practice and identify areas of improvement. Preventable readmissions or rehospitalizations directly affect patient safety, patient outcome, hospital reimbursement, and hospital accreditation. Preventable readmissions can be controlled by comprehensive discharge planning. Case managers are directly involved in discharge planning and thus have direct accountability regarding readmissions; therefore, they must refine the admission assessment screening to include specific information based on a patient's preadmission level of care. Collaboration with community-based providers is essential to managing readmissions or rehospitalizations. Hospitals will find it beneficial to track readmissions by using specific data points unique to readmissions such as source of admission and previous length of stay. Self-assessment of compliance will help identify opportunities for quality improvement in the case management department. PLEASE NOTE: Rules and regulations are constantly changing. It is critical to monitor changes in standards. Information contained in this article is current at the time of submission, and readers are encouraged to review the content of this article with administration before implementing changes.

  10. 25 CFR 32.4 - Policies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... control in planning, priority-setting, development, management, operation, staffing and evaluation in all... exemplary programs reflecting Tribal or Alaska Native village specific learning styles, including but not... management information system which will provide statistical information such as, but not limited to, student...

  11. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  12. 40 CFR 62.14620 - What site-specific documentation is required?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That...) Procedures for receiving, handling, and charging waste. (3) Incinerator startup, shutdown, and malfunction... limits. (7) Reporting and recordkeeping procedures. (8) The waste management plan required under §§ 62...

  13. Management strategies in hospitals: scenario planning

    PubMed Central

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management. PMID:26504735

  14. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  15. A case study of resources management planning with multiple objectives and projects

    NASA Astrophysics Data System (ADS)

    Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.

    1994-09-01

    Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.

  16. Strategic plan for infrastructure optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donley, C.D.

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less

  17. Household waste compositional analysis variation from insular communities in the framework of waste prevention strategy plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zorpas, Antonis A., E-mail: antonis.zorpas@ouc.ac.cy; Lasaridi, Katia, E-mail: klasaridi@hua.gr; Voukkali, Irene

    Highlights: • Waste framework directive has set clear waste prevention procedures. • Household Compositional analysis. • Waste management plans. • Zero waste approach. • Waste generation. - Abstract: Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impactmore » on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes.« less

  18. Naval Training Equipment Center Index of Technical Reports,

    DTIC Science & Technology

    1982-09-01

    741 RECOMMENDED PROCEDURES AND TRAINING NAVAL TRAINING AIDS. tAMPHIBIOUS OPERATIONS PROCEDURES AND RESEARCH PLANNING AD- 642 590 TRAINING DEVICES FOR...PROCEDURES AND RESEARCH PLANNING OBSERVATION AND FIRE CONTROL WITH FOR ANTI-AIR WARFARE TRAINING SPECIFIC REFERENCE TO THE TRAINING *AMPUTEES PROGRAM...619 AD- 707 757 NAVAL PERSONNEL *COMMUNICATION SATELLITES PROCEDURES AND RESEARCH PLANNING *COMBUSTION PRODUCTS Computer Managed Instruction by FOR

  19. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    NASA Technical Reports Server (NTRS)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  20. Repository-based software engineering program: Concept document

    NASA Technical Reports Server (NTRS)

    1992-01-01

    This document provides the context for Repository-Based Software Engineering's (RBSE's) evolving functional and operational product requirements, and it is the parent document for development of detailed technical and management plans. When furnished, requirements documents will serve as the governing RBSE product specification. The RBSE Program Management Plan will define resources, schedules, and technical and organizational approaches to fulfilling the goals and objectives of this concept. The purpose of this document is to provide a concise overview of RBSE, describe the rationale for the RBSE Program, and define a clear, common vision for RBSE team members and customers. The document also provides the foundation for developing RBSE user and system requirements and a corresponding Program Management Plan. The concept is used to express the program mission to RBSE users and managers and to provide an exhibit for community review.

  1. Bibliography. College and University Business Administration.

    ERIC Educational Resources Information Center

    National Association of College and University Business Officers, Washington, DC.

    This regularly-updated bibliography is organized by chapter and is generally limited to publications that have specific application to colleges and universities. The chapters include: business administration in higher education; institutional planning; management information systems and data processing; risk management and insurance;…

  2. 36 CFR 219.27 - Special designations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... National Forest System Land and Resource Management Planning Special Considerations § 219.27 Special... areas within the National Forest System that are identified for their unique or special characteristics... and may have specific requirements for their management. (b) Wilderness area reviews. Unless federal...

  3. Management by Objectives: A Program of Measured Performance.

    ERIC Educational Resources Information Center

    Block, Philip

    1980-01-01

    Management by objectives (MBO) is defined and an MBO program adapted for clinic services of a college of podiatric medicine is presented. Major steps with specific examples for goal setting, action planning, self-control, and periodic review are outlined. (Author/MLW)

  4. Storm Water Management for Industrial Activities: Developing Pollution Prevention Plans and Best Management Practices

    DTIC Science & Technology

    1992-09-01

    34* Evaluate past spills and leaks "* Identify non-storm water discharges and. illicit connections "* Collect or evaluate storm water quality data...activities or alterations that may be made to reduce the potential that spills will occur or impact storm water quality : "* Develop ways to recycle...be the first time that a spill response plan specifically addresses protection of storm water quality . Past experience has shown that the single most

  5. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  6. Towards the 21st Century. Facilities for Tertiary Education.

    ERIC Educational Resources Information Center

    Corbett, Anne, Ed.

    This report presents observations of experts in planning, design, construction or management of tertiary educational facilities about the emerging issues and the appropriate planning and architectural solutions for higher education facilities as the new millennium approaches. Specific topics discuss the current context of tertiary education…

  7. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    ERIC Educational Resources Information Center

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  8. 15 CFR 923.43 - Direct State land and water use planning and regulation-Technique B.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... OF COMMERCE OCEAN AND COASTAL RESOURCE MANAGEMENT COASTAL ZONE MANAGEMENT PROGRAM REGULATIONS... subsection 306(d)(11) of the Act for control of land and water uses within the coastal zone. The second such... specific to coastal management and the requirements of this Act. (2) Networking—The utilization of...

  9. 40 CFR 270.24 - Specific part B information requirements for process vents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...., identify the hazardous waste management units on a facility plot plan). (2) Information and data supporting... concentrations) that represent the conditions that exist when the waste management unit is operating at the... when the hazardous waste management unit is or would be operating at the highest load or capacity level...

  10. 76 FR 2881 - Fishlake National Forest; Utah; Oil and Gas Leasing EIS

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-18

    ... amending the FNF Land and Resource Management Plan (LRMP) to update management direction for minerals management, specifically oil and gas. The scope of the analysis is forest-wide. A Notice of Intent (NOI) was... NOI. DATES: Comments concerning the scope of the analysis were received during the initial scoping...

  11. Geographic Information System Tools for Conservation Planning: User's Manual

    USGS Publications Warehouse

    Fox, Timothy J.; Rohweder, Jason J.; Kenow, K.P.; Korschgen, C.E.; DeHaan, H.C.

    2003-01-01

    Public and private land managers desire better ways to incorporate landscape, species, and habitat relations into their conservation planning processes. We present three tools, developed for the Environmental Systems Research Institute?s ArcView 3.x platform, applicable to many types of wildlife conservation management and planning efforts. These tools provide managers and planners with the ability to rapidly assess landscape attributes and link these attributes with species-habitat information. To use the tools, the user provides a detailed land cover spatial database and develops a matrix to identify species-habitat relations for the landscape of interest. The tools are applicable to any taxa or suite of taxa for which the required data are available. The user also has the ability to interactively make polygon-specific changes to the landscape and re-examine species-habitat relations. The development of these tools has given resource managers the means to evaluate the merits of proposed landscape management scenarios and to choose the scenario that best fits the goals of the managed area.

  12. Integrating management tools and concepts to develop an estuarine planning support system: A case study of the Humber Estuary, Eastern England.

    PubMed

    Lonsdale, Jemma-Anne; Weston, Keith; Barnard, Steve; Boyes, Suzanne J; Elliott, Michael

    2015-11-15

    Estuaries are important because of their multiple uses and users which often makes them challenging to manage since management must strike a balance between the needs of users, the estuaries' ecological and economic value and the context of multiple legislative drivers. To facilitate management we have therefore developed an Estuarine Planning Support System (EPSS) framework using the Humber Estuary, Eastern England, as a case study which integrates the current legislation tools and concepts. This integrated EPSS framework is an improvement on previous approaches for assessing cumulative impacts as it takes into account legislative drivers, management tools and other mechanisms for controlling plans/projects specific to the estuary. It therefore enables managers and users to assess and address both the current state and the way in which a new industrial, port or urban development could impact an estuary in an accessible and understandable framework. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  13. Lakes and ponds recreation management: a state-wide application of the visitor impact management process

    Treesearch

    Jerry J. Vaske; Rodney R. Zwick; Maureen P. Donnelly

    1992-01-01

    The Visitor Impact Management (VIM) process is designed to identify unacceptable changes occurring as a result of visitor use and to develop management strategies to keep visitor impacts within acceptable levels. All previous attempts to apply the VIM planning framework have concentrated on specific resources. This paper expands this focus to an entire state. Based on...

  14. Dengue Contingency Planning: From Research to Policy and Practice

    PubMed Central

    Runge-Ranzinger, Silvia; Kroeger, Axel; Olliaro, Piero; McCall, Philip J.; Sánchez Tejeda, Gustavo; Lloyd, Linda S.; Hakim, Lokman; Bowman, Leigh R.; Horstick, Olaf; Coelho, Giovanini

    2016-01-01

    Background Dengue is an increasingly incident disease across many parts of the world. In response, an evidence-based handbook to translate research into policy and practice was developed. This handbook facilitates contingency planning as well as the development and use of early warning and response systems for dengue fever epidemics, by identifying decision-making processes that contribute to the success or failure of dengue surveillance, as well as triggers that initiate effective responses to incipient outbreaks. Methodology/Principal findings Available evidence was evaluated using a step-wise process that included systematic literature reviews, policymaker and stakeholder interviews, a study to assess dengue contingency planning and outbreak management in 10 countries, and a retrospective logistic regression analysis to identify alarm signals for an outbreak warning system using datasets from five dengue endemic countries. Best practices for managing a dengue outbreak are provided for key elements of a dengue contingency plan including timely contingency planning, the importance of a detailed, context-specific dengue contingency plan that clearly distinguishes between routine and outbreak interventions, surveillance systems for outbreak preparedness, outbreak definitions, alert algorithms, managerial capacity, vector control capacity, and clinical management of large caseloads. Additionally, a computer-assisted early warning system, which enables countries to identify and respond to context-specific variables that predict forthcoming dengue outbreaks, has been developed. Conclusions/Significance Most countries do not have comprehensive, detailed contingency plans for dengue outbreaks. Countries tend to rely on intensified vector control as their outbreak response, with minimal focus on integrated management of clinical care, epidemiological, laboratory and vector surveillance, and risk communication. The Technical Handbook for Surveillance, Dengue Outbreak Prediction/ Detection and Outbreak Response seeks to provide countries with evidence-based best practices to justify the declaration of an outbreak and the mobilization of the resources required to implement an effective dengue contingency plan. PMID:27653786

  15. A Smartwatch-Driven Medication Management System Compliant to the German Medication Plan.

    PubMed

    Keil, Andreas; Gegier, Konstantin; Pobiruchin, Monika; Wiesner, Martin

    2016-01-01

    Medication adherence is an important factor for the outcome of medical therapies. To support high adherence levels, smartwatches can be used to assist the patient. However, a successful integration of such devices into clinicians' or general practitioners' information systems requires the use of standards. In this paper, a medication management system supplied with smartwatch generated feedback events is presented. It allows physicians to manage their patients' medications and track their adherence in real time. Moreover, it fosters interoperability via a ISO/IEC 16022 data matrix which encodes related medication data in compliance with the German Medication Plan specification.

  16. Exploring Crisis Management in U.S. Small Businesses

    NASA Astrophysics Data System (ADS)

    Williams, Jon

    As a critical infrastructure, the US electricity grid supplies electricity to 340 million people within eight separate regions. The power infrastructure is vulnerable to many types of disasters capable of severing supplies of electricity. The impact on the employees and communities when small- and medium-size enterprises are shut down due to disasters can be severe. The purpose of the quantitative comparative study was to explore small- and medium-size enterprises crisis management strategies in the case of power infrastructure vulnerabilities. Perceptions of small business leaders were probed about crisis management planning relevant to three secondary factors: prior experience of crises, threat perceptions, and planning self-efficacy. Participants completed an adapted questionnaire instrument based on a five-point Likert scale for six sub-factors including resilience through planning, financial impact, operational crisis management, the perfect storm, the aftermath of survival, and atrophy. The instrument also measured three additional factors to include, prior experience of crises, threat perceptions, and planning self-efficacy, across seven types of crises. The results of this study indicated that of the 276 respondents, 104 had no crisis plans, but 172 did have crisis plans. Of those who had implemented crisis plans, 19% had specific provisions to address power outages or attacks on the electrical grid. Of the respondents who had not planned for power outages nor experienced significant losses of power, a statistically significant number acknowledged an external threat to their business. The majority of respondents indicated that long-term planning was related to resilience; however, the migration of crisis understanding into the planning process or implementation was not implemented. This heightened awareness of potential crises without the corresponding development and implementation of mitigation crisis plans requires additional research to understand drivers effecting the decision making process with crisis managers.

  17. Finance issue brief: direct access: year end report-2002.

    PubMed

    Morgan, Rachel; MacEachern, Lillian

    2002-12-31

    Consumer demand for a less restrictive referral system has urged legislators, as well as the managed care industry and those in the medical field, to seek the best solution to the problem. The point of service (POS) plan was an early attempt by managed care plans to provide more freedom for enrollees. But POS plans are not always available or cost effective. Several of the larger managed care organizations, in an effort to improve enrollee and provider satisfaction, have eliminated or streamlined their referral processes. The American Medical Association has recommended that primary care and other medical specialty organizations collaborate in developing guidelines for specialty referrals, urging health plans to allow direct access in network without financial penalty as long as the access conforms with the established guidelines. In the meantime, legislators have responded to constituents by enacting measures that mandate direct access for specific types of care or standing referrals for ongoing treatment.

  18. Finance issue brief: direct access: year end report-2003.

    PubMed

    MacEachern, Lillian

    2003-12-31

    Consumer demand for a less restrictive referral system has urged legislators, as well as the managed care industry and those in the medical field, to seek the best solution to the problem. The point of service (POS) plan was an early attempt by managed care plans to provide more freedom for enrollees. But POS plans are not always available or cost effective. Several of the larger managed care organizations, in an effort to improve enrollee and provider satisfaction, have eliminated or streamlined their referral processes. The American Medical Association has recommended that primary care and other medical specialty organizations collaborate in developing guidelines for specialty referrals, urging health plans to allow direct access in network without financial penalty as long as the access conforms with the established guidelines. In the meantime, legislators have responded to constituents by enacting measures that mandate direct access for specific types of care or standing referrals for ongoing treatment.

  19. Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giffen, Neil R

    This document outlines a plan for management of nuisance wildlife at the Oak Ridge National Laboratory (ORNL). Nuisance wildlife management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. This plan covers the following subjects: (1) roles and responsibilities of individuals, groups, and agencies; (2) the general protocol for reducing nuisance wildlife problems; and (3) species-specific methodologies for resolving nuisance wildlife management issues for mammals, birds, snakes, and insects. Achievement of the objectives of this plan will be a joint effort between the Tennessee Wildlife Resources Agency (TWRA); U. S. Department ofmore » Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS)-Wildlife Services (WS); and ORNL through agreements between TWRA and the U.S. Department of Energy (DOE); DOE and UT-Battelle, LLC; and UT-Battelle, LLC; and USDA, APHIS-WS.« less

  20. Using Current and Historic Climate Data and Bayesian Belief Networks to Predict Optimum Satellite Image Acquisition Periods for Detecting Cheatgrass on the Snake River Plain, Idaho

    NASA Astrophysics Data System (ADS)

    Rope, R. C.; Ames, D. P.; Jerry, T. D.; Cherry, S. J.

    2005-12-01

    Invasive plant species, such as Bromus tectorum (cheatgrass), cost the United States over $36 billion per year and have encroached upon over 100 million acres while impacting range site productivity, disturbing wildlife habitat, altering the wildland fire regime and frequencies, and reducing biodiversity. Because of these adverse impacts, federal, tribal, state, and county land managers are faced with the challenge of prevention, early detection, management, and monitoring of invasive plants. Often these managers rely on the analysis of remotely sensed imagery as part of their management plan. However, it's difficult to predict specific phenological events that allow for the spectral discrimination of invasive species using only remotely sensed imagery. To address this issue tools are being developed to model and view optimal periods to collect high spatial and/or spectral resolution remotely sensed data for refined detection and mapping of invasive species and for use as a decision support tool for land managers. These tools involve the integration of historic and current climate data (cumulative growing days and precipitation) satellite imagery (MODIS) and Bayesian Belief Networks, and a web ArcIMS application to distribute the information. The general approach is to issue an initial forecast early in the year based on the previous years' data. As the year progresses, air temperature, precipitation and newly acquired low resolution MODIS satellite imagery will be used to update the prediction. Updating will be accomplished using a Bayesian Belief Network model that indicates the probabilistic relationships between prior years' conditions and those of the current year. These tools have specific application in providing a means for which land managers can efficiently and effectively detect, map, and monitor invasive plant species, specifically cheatgrass, in western rangelands. This information can then be integrated into management studies and plans to help land managers more accurately and completely determine areas infested with cheatgrass to aid in their eradication practices and future management plans.

  1. Improving state Medicaid contracts and plan practices for children with special needs.

    PubMed

    Fox, H B; McManus, M A

    1998-01-01

    The rapid transition of state Medicaid beneficiaries into fully capitated managed care plans requires a special focus on children with chronic or disabling conditions, who often depend on numerous pediatric physicians and other specialty services for health care and related services. Because managed care arrangements for this population are growing in popularity nationwide, it is important that states craft managed care contracts to address the unique needs of children with complex physical, developmental, and mental health problems. Based on the research reported in this article, in-depth interviews with state Medicaid agency staff, interviews with medical directors and administrators of managed care plans serving Medicaid recipients, and input from experts in pediatrics and managed care, a set of recommendations is made for tailoring managed care contracts to meet the needs of this vulnerable group of children. Six contracting elements that should be adopted by state Medicaid agencies include (1) clarifying the specificity of pediatric benefits, (2) defining appropriate pediatric provider capacity requirements, (3) developing a medical necessity standard specific to children, (4) identifying pediatric quality-of-care measures, (5) setting appropriate pediatric capitation rates, and (6) creating incentives for high-quality pediatric care. Nine approaches that should be adopted by managed care practices interested in providing high-quality care for children with special needs also are identified. These include (1) ensuring that assigned primary care providers have appropriate training and experience, (2) offering support systems for primary care practices, (3) providing specialty consultation for primary care providers, (4) establishing arrangements for the comanagement of primary and specialty pediatric services, (5) arranging for comprehensive care coordination, (6) establishing flexible service authorization policies, (7) implementing provider profiling systems that adjust for pediatric case mix, (8) creating financial incentives for serving children with special needs, and (9) encouraging family involvement in plan operations. Implementing these changes to managed care contracting could have a major impact on the quality and comprehensiveness of health care received by children with special needs. Successful implementation, however, requires strong support from both state Medicaid agencies and the managed care plans dedicated to serving this population.

  2. 12 CFR 9.101 - Providing investment advice for a fee.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... specific securities, such as a national bank engaged in portfolio advisory and management activities... counseling activities, including strategic planning of a financial nature, merger and acquisition advisory... activities incidental to acting as a municipal securities dealer; (iv) Real estate management services...

  3. A Climate Change Adaptation Strategy for Management of ...

    EPA Pesticide Factsheets

    Sea level rise is causing shoreline erosion, increased coastal flooding, and marsh vulnerability to the impact of storms. Coastal marshes provide flood abatement, carbon and nutrient sequestration, water quality maintenance, and habitat for fish, shellfish, and wildlife, including species of concern, such as the saltmarsh sparrow (Ammodramus caudacutus). We present a climate change adaptation strategy (CCAS) adopted by scientific, management, and policy stakeholders for managing coastal marshes and enhancing system resiliency. A common adaptive management approach previously used for restoration projects was modified to identify climate-related vulnerabilities and plan climate change adaptive actions. As an example of implementation of the CCAS, we describe the stakeholder plans and management actions the US Fish and Wildlife Service and partners developed to build coastal resiliency in the Narrow River Estuary, RI, in the aftermath of Superstorm Sandy. When possible, an experimental BACI (before-after, control-impact) design, described as pre- and post-sampling at the impact site and one or more control sites, was incorporated into the climate change adaptation and implementation plans. Specific climate change adaptive actions and monitoring plans are described and include shoreline stabilization, restoring marsh drainage, increasing marsh elevation, and enabling upland marsh migration. The CCAS provides a framework and methodology for successfully managing coa

  4. Computer-Assisted Virtual Planning for Surgical Guide Manufacturing and Internal Distractor Adaptation in the Management of Midface Hypoplasia in Cleft Patients.

    PubMed

    Scolozzi, Paolo; Herzog, Georges

    2017-07-01

    We are reporting the treatment of severe maxillary hypoplasia in two patients with unilateral cleft lip and palate by using a specific approach combining the Le Fort I distraction osteogenesis technique coupled with computer-aided design/computer-aided manufacturing customized surgical guides and internal distractors based on virtual computational planning. This technology allows for the transfer of the virtual planned reconstruction to the operating room by using custom patient-specific implants, surgical splints, surgical cutting guides, and surgical guides to plate or distractor adaptation.

  5. 76 FR 6403 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    .... Program Planning A. Annual Catch Limit (ACL) Specification Process B. Workshop on ACLs for Coral Reef.... Coastal and Marine Spatial Planning 4. Ecosystem Monitoring and Community Issues A. Report on Coral Reef... Resources i. Coral Reef Fisheries ii. Bottomfish Fisheries iii. Crustacean Fisheries B. National Marine...

  6. Strategic plan creates a blueprint for budgeting.

    PubMed

    Cook, D

    1990-05-01

    Effective healthcare organizations develop budgets that reflect and support a strategic plan. Senior managers set a framework that expresses the hospital's future strategic objectives. The budget enables executives to determine which specific service lines are profitable or unprofitable. Administrators and clinicians at all levels are involved in the budgeting process.

  7. U.S. Department of Education Federal Student Aid Five-Year Plan, 2006-2010

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    This document reflects Federal Student Aid's solid progress in meeting strategic objectives since becoming a Performance-Based Organization. Specifically, the plan addresses continuing efforts to increase program integrity, improve customer service and achieve measurable results in the management and administration of the Title IV student…

  8. Protection of West Indian manatees (Trichechus manatus) in Florida. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reynolds, J.E.; Gluckman, C.J.

    1988-05-01

    Research and management actions necessary for the recovery of endangered West Indian manatees (Trichechus manatus) have received considerable attention over the past decade from many individuals, institutions, and agencies. A new Manatee Recovery Plan is being developed by the United States Fish and Wildlife Service and promises to provide research goals and timetables to enhance further recovery of manatees in Florida. Recommendations are made in the following areas; implementing local, site-specific management plans that specifically address manatee protection and habitat conservation; increasing research funding to allow better assessment of manatee critical habitat, life history parameters, mortality, and movement patterns; acquiringmore » or restricting access to critical manatee habitat to create a system of reserves; expanding enforcement capability to protect manatees and their habitat; and coordinating education and awareness programs that target specific user groups.« less

  9. WastePlan model implementation for New York State. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Visalli, J.R.; Blackman, D.A.

    1995-07-01

    WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992more » to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.« less

  10. IPG Job Manager v2.0 Design Documentation

    NASA Technical Reports Server (NTRS)

    Hu, Chaumin

    2003-01-01

    This viewgraph presentation provides a high-level design of the IPG Job Manager, and satisfies its Master Requirement Specification v2.0 Revision 1.0, 01/29/2003. The presentation includes a Software Architecture/Functional Overview with the following: Job Model; Job Manager Client/Server Architecture; Job Manager Client (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Job Manager Server (Job Manager Client Class Diagram and Job Manager Client Activity Diagram); Development Environment; Project Plan; Requirement Traceability.

  11. Blood management issues using blood management strategies.

    PubMed

    Stulberg, Bernard N; Zadzilka, Jayson D

    2007-06-01

    Blood management strategies is a term used to address a coordinated approach to the management of blood loss in the perioperative period for total joint arthroplasty. The premise of any blood management strategy is that each patient, surgeon, and operative intervention experiences different risks of requiring transfusion, that those risks can be identified, and that a plan can be implemented to address them. A surgeon's decision to transfuse should be based on physiologic assessment of the patient's response to anemia and not on an arbitrary number ("transfusion trigger"). Intervention strategies can be applied preoperatively, intraoperatively, and postoperatively. Patient-specific planning allows for the appropriate use of patient, hospital, and system resources, ensuring that the consequences of anemia are minimized and that the patient's recovery process is optimized.

  12. SMART GUIDANCE AND SMARTE - TOOLS FOR DEVELOPING SITE SPECIFIC REDEVELOPMENT PLANS

    EPA Science Inventory

    Site-specific Management Approaches and Redevelopment Tools (SMART) Guidance and its electronic counterpart, SMARTe are being developed jointly with the German Federal Ministry of Education and Research and the Interstate Technology Regulatory Council. These products will assist ...

  13. [Planning a Health Residence for Prison Security Measures, Tuscany (Italy)].

    PubMed

    Porfido, Eugenio; Colombai, Renato; Scarpa, Franco; Totaro, Michele; Tani, Luca; Baldini, Claudio; Baggiani, Angelo

    2016-01-01

    Health Residences for Prison Security Measures are facilities hosting psychotic persons who have committed crimes and providing them with personalized rehabilitation and treatment plans to promote their reinstatement in society. The aim of this study was to describe the criteria for planning and designing a prison health residence in the Tuscany region (Italy), to be managed by the regional healthcare service, in line with current regulations, with dedicated staff for providing specific treatment plans and programmes.

  14. Waste treatability guidance program. User`s guide. Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toth, C.

    1995-12-21

    DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less

  15. Health-care district management information system plan: Review of operations analysis activities during calendar year 1975 and plan for continued research and analysis activities

    NASA Technical Reports Server (NTRS)

    Nielson, G. J.; Stevenson, W. G.

    1976-01-01

    Operations research activities developed to identify the information required to manage both the efficiency and effectiveness of the Veterans Administration (VA) health services as these services relate to individual patient care are reported. The clinical concerns and management functions that determine this information requirement are discussed conceptually. Investigations of existing VA data for useful management information are recorded, and a diagnostic index is provided. The age-specific characteristics of diseases and lengths of stay are explored, and recommendations for future analysis activities are articulated. The effect of the introduction of new technology to health care is also discussed.

  16. Beyond cost: 'responsible purchasing' of managed care by employers.

    PubMed

    Lo Sasso, A T; Perloff, L; Schield, J; Murphy, J J; Mortimer, J D; Budetti, P P

    1999-01-01

    We explore the extent of "responsible purchasing" by employers--the degree to which employers collect and use nonfinancial information in selecting and managing employee health plans. Most firms believe that they have some responsibility for assessing the quality of the health plans they offer. Some pay attention to plan characteristics such as the ability to provide adequate access to providers and services and scores on enrollee satisfaction surveys. A more limited but still notable number of firms take specific actions based on responsible purchasing information. Because of countervailing pressures, however, it is not clear whether or not the firms most involved in responsible purchasing are signaling a developing trend.

  17. 75 FR 60709 - Fisheries Off West Coast States; Notice of Availability for Amendments 16-5 and 23 to the Pacific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ...NMFS announces that the Pacific Fishery Management Council (Council) has submitted Amendments 16-5 and 23 to the Pacific Coast Groundfish Fishery Management Plan (FMP) for Secretarial review. Amendment 16-5 would modify the FMP to implement an overfished species rebuilding plan for petrale sole and revise existing overfished species rebuilding plans. In addition, Amendment 16-5 would modify the default proxy values for FMSY and BMSY as they apply to the flatfish species, including petrale sole; and the harvest control rule policies. Amendment 23 introduces a new framework for fishery specifications and other measures for establishing Annual Catch Limits (ACLs) as required by the recent amendments to the Magnuson-Stevens Fishery Conservation and Management Act (Magnuson-Stevens Act).

  18. Design and Implementation of an International Training Program on Repository Development and Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vugrin, K.W.; Twitchell, Ch.A.

    2008-07-01

    Korea Hydro and Nuclear Power Co., Ltd. (KHNP) is an electric company in the Republic of Korea with twenty operational nuclear power plants and eight additional units that are either planned or currently under construction. Regulations require that KHNP manage the radioactive waste generated by their nuclear power plants. In the course of planning low, intermediate, and high level waste storage facilities, KHNP sought interaction with an acknowledged expert in the field of radioactive waste management and, consequently, contacted Sandia National Laboratories (SNL). KHNP has contracted with SNL to provide a year long training program on repository science. This papermore » discusses the design of the curriculum, specific plans for execution of the training program, and recommendations for smooth implementation of international training programs. (authors)« less

  19. Speaking across the drapes: communication strategies of anesthesiologists and obstetricians during a simulated maternal crisis.

    PubMed

    Minehart, Rebecca D; Pian-Smith, May C M; Walzer, Toni B; Gardner, Roxane; Rudolph, Jenny W; Simon, Robert; Raemer, Daniel B

    2012-06-01

    Organizational behavior and management fields have long realized the importance of teamwork and team-building skills, but only recently has health care training focused on these critical elements. Communication styles and strategies are a common focus of team training but have not yet been consistently applied to medicine. We sought to determine whether such communication strategies, specifically "advocacy" and "inquiry," were used de novo by medical professionals in a simulation-based teamwork and crisis resource management course. Explicit expression of a jointly managed clinical plan between providers, a strategy shown to improve patient safety, was also evaluated. Forty-four of 54 videotaped performances of an ongoing team-building skills course were viewed and analyzed for presence of advocacy and/or inquiry that related to information or a plan; inclusion criteria were participation of a nonconfederate obstetrician and an anesthesiologist. Verbal statement of a jointly managed clinical plan was also recorded. Anesthesiologists advocated information in 100% of cases and advocated their plans in 93% of cases but inquired information in 30% of cases and inquired about the obstetricians' plans in 11% of cases. Obstetricians advocated information in 73% of cases, advocated their plans in 73% of cases, inquired information in 75% of cases, and inquired about the anesthesiologists' plans in 59% of cases. An explicitly stated joint team plan was formed in 45% of cases. Anesthesiologists advocated more frequently than obstetricians, while obstetricians inquired and advocated in more balanced proportions. However, fewer than half of the teams explicitly agreed on a joint plan. Increasing awareness of communication styles, and possibly incorporating these skills into medical training, may help teams arrive more efficiently at jointly managed clinical plans in crisis situations.

  20. Case Management and Rehabilitation Counseling: Procedures and Techniques. Fourth Edition

    ERIC Educational Resources Information Center

    Roessler, Richard T.; Rubin, Stanford E.

    2006-01-01

    "Case Management and Rehabilitation Counseling" discusses procedures that are useful to rehabilitation professionals working in many settings. Specifically, this book reviews the finer points relating to diagnosing, arranging services, monitoring program outcomes, arranging for placement, planning for accommodations, ethical decision making,…

  1. Virginia and West Virginia's transportation research co-peer exchange (June 22-26, 2014).

    DOT National Transportation Integrated Search

    2015-04-01

    To be eligible for managing State Planning and Research (SP&R) funds, a state must agree to a peer review of its : management process with regard to Research, Development, and Technology Transfer (RD&T2) efforts. Specifically, the federal : regulatio...

  2. 18 CFR 1304.203 - Vegetation management.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Fertilizers and herbicides shall not be applied within the SMZ or elsewhere on TVA land, except as specifically approved in the Vegetative Management Plan. (m) Restricted use herbicides and pesticides shall not be applied on TVA-owned shoreland except by a State certified applicator. All herbicides and...

  3. 18 CFR 1304.203 - Vegetation management.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Fertilizers and herbicides shall not be applied within the SMZ or elsewhere on TVA land, except as specifically approved in the Vegetative Management Plan. (m) Restricted use herbicides and pesticides shall not be applied on TVA-owned shoreland except by a State certified applicator. All herbicides and...

  4. 18 CFR 1304.203 - Vegetation management.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...) Fertilizers and herbicides shall not be applied within the SMZ or elsewhere on TVA land, except as specifically approved in the Vegetative Management Plan. (m) Restricted use herbicides and pesticides shall not be applied on TVA-owned shoreland except by a State certified applicator. All herbicides and...

  5. 77 FR 68735 - New England Fishery Management Council; Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... Committee will continue to develop options and alternatives for Omnibus Essential Fish Habitat Amendment 2 (OA2). Specifically, the Committee will review Habitat Advisory Panel and Plan Development Team... England Fishery Management Council (Council) is scheduling a public meeting of its Habitat Oversight...

  6. 76 FR 81860 - Fisheries of the Exclusive Economic Zone Off Alaska; Gulf of Alaska; Final 2011 and 2012 Harvest...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... required by the final rule implementing Amendment 83 to the Fishery Management Plan for Groundfish of the...-Stevens Fishery Conservation and Management Act. DATES: The final 2011 and 2012 harvest specifications and... resources of the GOA, dated November 2011, are available from the North Pacific Fishery Management Council...

  7. 41 CFR 102-75.785 - What specifically must DOJ or FEMA address in the assignment request or recommendation that is...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... response use; (c) A copy of the approved application that defines the proposed plan of use; and (d) The... agency? 102-75.785 Section 102-75.785 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY...

  8. 41 CFR 102-75.785 - What specifically must DOJ or FEMA address in the assignment request or recommendation that is...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... response use; (c) A copy of the approved application that defines the proposed plan of use; and (d) The... agency? 102-75.785 Section 102-75.785 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY...

  9. 41 CFR 102-75.785 - What specifically must DOJ or FEMA address in the assignment request or recommendation that is...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... response use; (c) A copy of the approved application that defines the proposed plan of use; and (d) The... agency? 102-75.785 Section 102-75.785 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 75-REAL PROPERTY...

  10. Operations management: a tool to increase profitability.

    PubMed

    Mulvehill, M J

    2001-03-01

    Operations management enables the efficient utilization of the production systems in a business. This paper will address several key elements in the business competency of operations management. Specifically, this discussion will review the components of a material requirement planning system and a "just-in-time" system for inventory control and time management to enable the dentist to monitor a portion of the practice's overhead costs.

  11. A systematic conservation planning approach to fire risk management in Natura 2000 sites.

    PubMed

    Foresta, Massimiliano; Carranza, Maria Laura; Garfì, Vittorio; Di Febbraro, Mirko; Marchetti, Marco; Loy, Anna

    2016-10-01

    A primary challenge in conservation biology is to preserve the most representative biodiversity while simultaneously optimizing the efforts associated with conservation. In Europe, the implementation of the Natura 2000 network requires protocols to recognize and map threats to biodiversity and to identify specific mitigation actions. We propose a systematic conservation planning approach to optimize management actions against specific threats based on two fundamental parameters: biodiversity values and threat pressure. We used the conservation planning software Marxan to optimize a fire management plan in a Natura 2000 coastal network in southern Italy. We address three primary questions: i) Which areas are at high fire risk? ii) Which areas are the most valuable for threatened biodiversity? iii) Which areas should receive priority risk-mitigation actions for the optimal effect?, iv) which fire-prevention actions are feasible in the management areas?. The biodiversity values for the Natura 2000 spatial units were derived from the distribution maps of 18 habitats and 89 vertebrate species of concern in Europe (Habitat Directive 92/43/EEC). The threat pressure map, defined as fire probability, was obtained from digital layers of fire risk and of fire frequency. Marxan settings were defined as follows: a) planning units of 40 × 40 m, b) conservation features defined as all habitats and vertebrate species of European concern occurring in the study area, c) conservation targets defined according with fire sensitivity and extinction risk of conservation features, and d) costs determined as the complement of fire probabilities. We identified 23 management areas in which to concentrate efforts for the optimal reduction of fire-induced effects. Because traditional fire prevention is not feasible for most of policy habitats included in the management areas, alternative prevention practices were identified that allows the conservation of the vegetation structure. The proposed approach has potential applications for multiple landscapes, threats and spatial scales and could be extended to other valuable natural areas, including protected areas. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Improving supervision: a team approach.

    PubMed

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  13. Implementation of two new resource management information systems in Australia

    NASA Astrophysics Data System (ADS)

    Kessell, Stephen R.; Good, Roger B.; Hopkins, Angas J. M.

    1984-05-01

    This paper describes the development and implementation of PREPLAN, A Pristine Environment Planning Language and Simulator, for two conservation areas in Australia, Kosciusko National Park (New South Wales) and Tutanning Nature Reserve (Western Australia). PREPLAN was derived from the North American gradient modeling systems and the Forest Planning Language and Simulator (FORPLAN), but includes unique characteristics not previously available. PREPLAN includes an integrated resource management data base, modules for predicting site-specific vegetation, fuels, animals, fire behavior, and fire effects, and an English language instruction set. PREPLAN was developed specifically to provide available information and understanding of ecosystems to managers in a readily accessible and usable form, and to provide the motivation to conduct additional required research projects. An evaluation of the system's advantages and limitations is presented, and the way the utilization of such systems is improving natural area decision making throughout Australia is discussed.

  14. Materials Organization, Planning, and Homework Completion in Middle School Students with ADHD: Impact on Academic Performance.

    PubMed

    Langberg, Joshua M; Epstein, Jeffery N; Girio, Erin L; Becker, Stephen P; Vaughn, Aaron J; Altaye, Mekibib

    2011-06-01

    This study evaluated the homework functioning of middle school students with ADHD to determine what aspects are most predictive of school grades and the best source (e.g., parents or teachers) for obtaining this information. Students with ADHD in grades 5-8 ( N = 57) and their parents and teachers completed the Children's Organization Skills Scales (COSS) to measure materials organization, planning, and time-management, and parents completed the Homework Problems Checklist (HPC) to examine homework completion and homework materials management behaviors. Regression analyses revealed that parent-rated homework materials management and teacher-rated memory and materials management were the best predictors of school grades. These findings suggest that organization of materials is a critical component of the homework completion process for students with ADHD and an important target for intervention. Teachers were the best source of information regarding materials organization and planning, whereas parents were a valuable source of information for specific homework materials management problems.

  15. Materials Organization, Planning, and Homework Completion in Middle School Students with ADHD: Impact on Academic Performance

    PubMed Central

    Langberg, Joshua M.; Epstein, Jeffery N.; Girio, Erin L.; Becker, Stephen P.; Vaughn, Aaron J.; Altaye, Mekibib

    2013-01-01

    This study evaluated the homework functioning of middle school students with ADHD to determine what aspects are most predictive of school grades and the best source (e.g., parents or teachers) for obtaining this information. Students with ADHD in grades 5–8 (N = 57) and their parents and teachers completed the Children’s Organization Skills Scales (COSS) to measure materials organization, planning, and time-management, and parents completed the Homework Problems Checklist (HPC) to examine homework completion and homework materials management behaviors. Regression analyses revealed that parent-rated homework materials management and teacher-rated memory and materials management were the best predictors of school grades. These findings suggest that organization of materials is a critical component of the homework completion process for students with ADHD and an important target for intervention. Teachers were the best source of information regarding materials organization and planning, whereas parents were a valuable source of information for specific homework materials management problems. PMID:23577045

  16. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  17. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  18. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  19. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  20. 48 CFR 936.202-70 - Specifications charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... payments, the invitations for bids should so state, and the architect-engineer or construction management... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Special Aspects of Contracting for Construction 936.202-70 Specifications charges. (a) To support all invitations for bids, plans and...

  1. Reducing environmental noise impacts: A USAREUR noise management program handbook

    NASA Astrophysics Data System (ADS)

    Feather, Timothy D.; Shekell, Ted K.

    1991-06-01

    Noise pollution is a major environmental problem faced by the U.S. Army in Europe. Noise-related complaints from German citizens can escalate into intense political issues in German communities. This in turn hampers efficient operation of military training and often times threatens the Army's mission. In order to remedy these problems, USAREUR has developed a noise management program. A successful noise management program will limit the impact of unavoidable noise on the populace. This report, a component of the noise management program, is a reference document for noise management planning. It contains guidelines and rules-of-thumb for noise management. This document contains procedures which operation and training level personnel can understand and apply in their day to day noise management planning. Noise mitigation tips are given. Basic technical information that will aid in understanding noise mitigation is provided along with noise management through land use planning. Noise management for specific components of the military community, (airfields, base operations, training areas, and housing and recreation areas) are addressed. The nature of noise generated, means of noise abatement at the source, path, and receiver (both physical and organizational/public relations methods), and a case study example are described.

  2. Two approaches for incorporating climate change into natural resource management planning at Wind Cave National Park

    USGS Publications Warehouse

    Symstad, Amy J.; Long, Andrew J.; Stamm, John; King, David A.; Bachelet, Dominque M.; Norton, Parker A.

    2014-01-01

    Wind Cave National Park (WICA) protects one of the world’s longest caves, has large amounts of high quality, native vegetation, and hosts a genetically important bison herd. The park’s relatively small size and unique purpose within its landscape requires hands-on management of these and other natural resources, all of which are interconnected. Anthropogenic climate change presents an added challenge to WICA natural resource management because it is characterized by large uncertainties, many of which are beyond the control of park and National Park Service (NPS) staff. When uncertainty is high and control of this uncertainty low, scenario planning is an appropriate tool for determining future actions. In 2009, members of the NPS obtained formal training in the use of scenario planning in order to evaluate it as a tool for incorporating climate change into NPS natural resource management planning. WICA served as one of two case studies used in this training exercise. Although participants in the training exercise agreed that the scenario planning process showed promise for its intended purpose, they were concerned that the process lacked the scientific rigor necessary to defend the management implications derived from it in the face of public scrutiny. This report addresses this concern and others by (1) providing a thorough description of the process of the 2009 scenario planning exercise, as well as its results and management implications for WICA; (2) presenting the results of a follow-up, scientific study that quantitatively simulated responses of WICA’s hydrological and ecological systems to specific climate projections; (3) placing these climate projections and the general climate scenarios used in the scenario planning exercise in the broader context of available climate projections; and (4) comparing the natural resource management implications derived from the two approaches. Wind Cave National Park (WICA) protects one of the world’s longest caves, has large amounts of high quality, native vegetation, and hosts a genetically important bison herd. The park’s relatively small size and unique purpose within its landscape requires hands-on management of these and other natural resources, all of which are interconnected. Anthropogenic climate change presents an added challenge to WICA natural resource management because it is characterized by large uncertainties, many of which are beyond the control of park and National Park Service (NPS) staff. When uncertainty is high and control of this uncertainty low, scenario planning is an appropriate tool for determining future actions. In 2009, members of the NPS obtained formal training in the use of scenario planning in order to evaluate it as a tool for incorporating climate change into NPS natural resource management planning. WICA served as one of two case studies used in this training exercise. Although participants in the training exercise agreed that the scenario planning process showed promise for its intended purpose, they were concerned that the process lacked the scientific rigor necessary to defend the management implications derived from it in the face of public scrutiny. This report addresses this concern and others by (1) providing a thorough description of the process of the 2009 scenario planning exercise, as well as its results and management implications for WICA; (2) presenting the results of a follow-up, scientific study that quantitatively simulated responses of WICA’s hydrological and ecological systems to specific climate projections; (3) placing these climate projections and the general climate scenarios used in the scenario planning exercise in the broader context of available climate projections; and (4) comparing the natural resource management implications derived from the two approaches.

  3. Applying comprehensive environmental assessment to research planning for multiwalled carbon nanotubes: Refinements to inform future stakeholder engagement.

    PubMed

    Powers, Christina M; Grieger, Khara; Meacham, Connie A; Gooding, Meredith Lassiter; Gift, Jeffrey S; Lehmann, Geniece M; Hendren, Christine O; Davis, J Michael; Burgoon, Lyle

    2016-01-01

    Risk assessments and risk management efforts to protect human health and the environment can benefit from early, coordinated research planning by researchers, risk assessors, and risk managers. However, approaches for engaging these and other stakeholders in research planning have not received much attention in the environmental scientific literature. The Comprehensive Environmental Assessment (CEA) approach under development by the United States Environmental Protection Agency (USEPA) is a means to manage complex information and input from diverse stakeholder perspectives on research planning that will ultimately support environmental and human health decision making. The objectives of this article are to 1) describe the outcomes of applying lessons learned from previous CEA applications to planning research on engineered nanomaterial, multiwalled carbon nanotubes (MWCNTs) and 2) discuss new insights and refinements for future efforts to engage stakeholders in research planning for risk assessment and risk management of environmental issues. Although framed in terms of MWCNTs, this discussion is intended to enhance research planning to support assessments for other environmental issues as well. Key insights for research planning include the potential benefits of 1) ensuring that participants have research, risk assessment, and risk management expertise in addition to diverse disciplinary backgrounds; 2) including an early scoping step before rounds of formal ratings; 3) using a familiar numeric scale (e.g., US dollars) versus ordinal rating scales of "importance"; 4) applying virtual communication tools to supplement face-to-face interaction between participants; and 5) refining criteria to guide development of specific, actionable research questions. © 2015 SETAC.

  4. Adaptive management: a paradigm for remediation of public facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Janecky, David R; Whicker, Jeffrey J; Doerr, Ted B

    2009-01-01

    Public facility restoration planning traditionally focused on response to natural disasters and hazardous materials accidental releases. These plans now need to integrate response to terrorist actions. Therefore, plans must address a wide range of potential vulnerabilities. Similar types of broad remediation planning are needed for restoration of waste and hazardous material handling areas and facilities. There are strong similarities in damage results and remediation activities between unintentional and terrorist actions; however, the uncertainties associated with terrorist actions result in a re-evaluation of approaches to planning. Restoration of public facilities following a release of a hazardous material is inherently far moremore » complex than in confined industrial settings and has many unique technical, economic, social, and political challenges. Therefore, they arguably involve a superset of drivers, concerns and public agencies compared to other restoration efforts. This superset of conditions increases complexity of interactions, reduces our knowledge of the initial conditions, and even condenses the timeline for restoration response. Therefore, evaluations of alternative restoration management approaches developed for responding to terrorist actions provide useful knowledge for large, complex waste management projects. Whereas present planning documents have substantial linearity in their organization, the 'adaptive management' paradigm provides a constructive parallel operations paradigm for restoration of facilities that anticipates and plans for uncertainty, multiple/simUltaneous public agency actions, and stakeholder participation. Adaptive management grew out of the need to manage and restore natural resources in highly complex and changing environments with limited knowledge about causal relationships and responses to restoration actions. Similarities between natural resource management and restoration of a facility and surrounding area(s) after a disruptive event suggest numerous advantages over preset linearly-structured plans by incorporating the flexibility and overlap of processes inherent in effective facility restoration. We discuss three restoration case studies (e.g., the Hart Senate Office Building anthrax restoration, Rocky Flats actinide remediation, and hurricane destruction restoration), that implement aspects of adaptive management but not a formal approach. We propose that more formal adoption of adaptive management principles could be a basis for more flexible standards to improve site-specific remediation plans under conditions of high uncertainty.« less

  5. 29 CFR 2550.404c-1 - ERISA section 404(c) plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... investment alternative (e.g., investment management fees, administrative fees, transaction costs) which... the management or policies of such person. (4) A designated investment alternative is a specific... beneficiary an opportunity to choose, from a broad range of investment alternatives, the manner in which some...

  6. Development of a Medicaid Behavioral Health Case-Mix Model

    ERIC Educational Resources Information Center

    Robst, John

    2009-01-01

    Many Medicaid programs have either fully or partially carved out mental health services. The evaluation of carve-out plans requires a case-mix model that accounts for differing health status across Medicaid managed care plans. This article develops a diagnosis-based case-mix adjustment system specific to Medicaid behavioral health care. Several…

  7. Wilderness and backcountry site restoration guide

    Treesearch

    Lisa Therrell; David Cole; Victor Claassen; Chris Ryan; Mary Ann Davies

    2006-01-01

    This comprehensive guide focuses on restoration of small-scale impact caused by human actions in wilderness and backcountry areas. The guide's goals are to: 1) Help practitioners develop plans that thoroughly address the question of whether site restoration is the best management action and, if so, develop a site-specific restoration plan that incorporates...

  8. Improved modeling of network transportation flows, including land use-transportation interactions : a research collaboration between USC (METRANS) and Caltrans District 7 (Office of Advance Planning).

    DOT National Transportation Integrated Search

    2011-06-01

    Caltrans District 7 manages the highway system of Los Angeles and Ventura counties. As part : of their responsibilities, the agency needs to generate planning reports. One such report is the : transportation concept report (TCR). It is route specific...

  9. 77 FR 29593 - North Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... Particular Concern (HAPC) skate egg sites. 4. BSAI Crab Rebuilding Crab Plan Team report on Set catch Specifications for 4 stocks; Final action on Pribilof Bristol Bay Red King Crab rebuilding plan. 5. Freezer... and tasking. 8. Other Business The SSC agenda will include the following issues: 1. EFH 2. BSAI Crab...

  10. A Time-Cost Management System for use in Educational Planning.

    ERIC Educational Resources Information Center

    McIsaac, Donald N., Jr.; and Others

    Prepared specifically for the Denver Public Schools, this manual nevertheless provides some of the basic understanding required for the proper execution of educational planning based upon PERT/CPM techniques. The theory of PERT/CPM and the fundamental processes involved therein are elucidated in the first part of the manual while the operating…

  11. Spent nuclear fuel project high-level information management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge ofmore » developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements. While the SNFP can use some work done Sitewide and by projects such as the Tank Waste Remediation System (TWRS), they will still need to make some IM investments of their own.« less

  12. Learning from conservation planning for the U.S. National Wildlife Refuges.

    PubMed

    Meretsky, Vicky J; Fischman, Robert L

    2014-10-01

    The U.S. National Wildlife Refuge System has nearly completed its first round of unit-level, comprehensive conservation plans (CCPs) and will soon begin required revisions. Laws and policies governing refuge planning emphasize ecological integrity, landscape-scale conservation, and adaptive management. We evaluated 185 CCPs completed during 2005-2011, which cover 324 of 555 national wildlife refuges. We reviewed CCP prescriptions addressing 5 common conservation issues (habitat and game, nongame, imperiled, and invasive species) and 3 specialized topics (landscape-scale conservation, climate change, and environmental quality). Common conservation issues received prescriptions in >90% of CCPs. Specialized topics received more variable treatment. Prescriptions for aquatic connectivity, water quantity, and climate-change impacts increased over the study period. Except for climate change, direct actions were the most common type of management prescription, followed by plans or studies. Most CCPs stated a commitment to adaptive management and prescribed monitoring for common conservation objectives; other aspects of planning for adaptive management were often lacking, despite strong support for adaptive management in the conservation planning literature. To better address refuge-specific threats, we recommend that revised plans explicitly match identified refuge issues with prescriptions, particularly for under-represented concerns such as novel pests and pathogens. We recommend incorporating triggers into monitoring frameworks and specifying actions that will occur when threshold values are reached to improve support for adaptive management. Revised CCPs should better reflect work that refuges already undertake to extend conservation objectives beyond their borders and better engage with regional conservation efforts to continue this work. More thorough landscape-scale threat assessments and explicit prioritization of planned actions would further improve conservation effectiveness. Excellent examples of all recommended practices exist within the CCPs we examined; sharing best planning practices would improve planning efficiency within the refuge system. © 2014 The Authors. Conservation Biology published by Wiley Periodicals, Inc., on behalf of the Society for Conservation Biology.

  13. Planning for Bioterrorism. Behavioral & Mental Health Responses to Weapons of Mass Destruction & Mass Disruption

    DTIC Science & Technology

    2000-07-16

    Specifically, the management of the acute situation will set the tone for societal responses. The accurate portrayal of ongoing efforts and successful...their comments and actions. Specifically, the management of the acute situation will set the tone for societal responses. The accurate portrayal of...casualties. In the acute phase, anxiolytics may help acutely anxious individuals who do not respond to reassurance and education. In the chronic phase

  14. Alaskan resources, current development. Traditional cultural values, and the role of LANDSAT data in current and future land use management planning

    NASA Technical Reports Server (NTRS)

    Laperriere, A. J.

    1975-01-01

    Past, present, and proposed applications of LANDSAT data for renewable resource assessments in Alaska are described. Specific projects briefly discussed include: a feasibility investigation applying LANDSAT data to caribou habitat mapping in northeast Alaska, analysis of a native corporate region in southwest Alaska, analysis of a game management unit in interior Alaska, and two proposed analyses in northwest Alaska. These analyses principally address range evaluations concerning caribou, moose, and Dall sheep, but results have application to other renewable resource themes. Application of resource assessment results to a statewide land use management plan is discussed.

  15. Collaborative socioeconomic tool development to address management and planning needs

    USGS Publications Warehouse

    Richardson, Leslie A.; Huber, Christopher; Cullinane Thomas, Catherine; Donovan, Elizabeth; Koontz, Lynne M.

    2014-01-01

    Public lands and resources managed by the National Park Service (NPS) and other land management agencies provide a wide range of social and economic benefits to both nearby local communities and society as a whole, ranging from job creation, to access to unique recreational opportunities, to subsistence and tribal uses of the land. Over the years, there has been an increased need to identify and analyze the socioeconomic effects of the public’s use of NPS lands and resources, and the wide range of NPS land management decisions. This need stems from laws such as the National Environmental Policy Act (NEPA), increased litigation and appeals on NPS management decisions, as well as an overall need to demonstrate how parks benefit communities and the American public. To address these needs, the U.S. Geological Survey (USGS) and NPS have an ongoing partnership to collaboratively develop socioeconomic tools to support planning needs and resource management. This article discusses two such tools. The first, Assessing Socioeconomic Planning Needs (ASPN), was developed to help NPS planners and managers identify key social and economic issues that can arise as a result of land management actions. The second tool, the Visitor Spending Effects (VSE) model, provides a specific example of a type of analysis that may be recommended by ASPN. The remainder of this article discusses the development, main features, and plans for future versions and applications of both ASPN and the VSE.

  16. Financial performance of health plans in Medicaid managed care.

    PubMed

    McCue, Mike

    2012-01-01

    This study assesses the financial performance of health plans that enroll Medicaid members across the key plan traits, specifically Medicaid dominant, publicly traded, and provider-sponsored. National Association of Insurance Commissioners (NAIC) financial data, coupled with selected state financial data, were analyzed for 170 Medicaid health plans for 2009. A mean test compared the mean values for medical loss, administrative cost, and operating margin ratios across these plan traits. Medicaid dominant plans are plans with 75 percent of their total enrollment in the Medicaid line of business. Plans that are Medicaid dominant and publicly traded incurred a lower medical loss ratio and higher administrative cost ratio than multi-product and non-publicly traded plans. Medicaid dominant plans also earned a higher operating profit margin. Plans offering commercial and Medicare products are operating at a loss for their Medicaid line of business. Health plans that do not specialize in Medicaid are losing money. Higher medical cost rather than administrative cost is the underlying reason for this financial loss. Since Medicaid enrollees do not account for their primary book of business, these plans may not have invested in the medical management programs to reduce inappropriate emergency room use and avoid costly hospitalization.

  17. The effectiveness of risk management: an analysis of project risk planning across industries and countries.

    PubMed

    Zwikael, Ofer; Ahn, Mark

    2011-01-01

    This article examines the effectiveness of current risk management practices to reduce project risk using a multinational, multi-industry study across different scenarios and cultures. A survey was administered to 701 project managers, and their supervisors, in seven industries and three diverse countries (New Zealand, Israel, and Japan), in multiple languages during the 2002-2007 period. Results of this study show that project context--industry and country where a project is executed--significantly impacts perceived levels of project risk, and the intensity of risk management processes. Our findings also suggest that risk management moderates the relationship between risk level and project success. Specifically, we found that even moderate levels of risk management planning are sufficient to reduce the negative effect risk levels have on project success. © 2010 Society for Risk Analysis.

  18. A computer-oriented system for assembling and displaying land management information

    Treesearch

    Elliot L. Amidon

    1964-01-01

    Maps contain information basic to land management planning. By transforming conventional map symbols into numbers which are punched into cards, the land manager can have a computer assemble and display information required for a specific job. He can let a computer select information from several maps, combine it with such nonmap data as treatment cost or benefit per...

  19. Fuels planning: science synthesis and integration; economic uses fact sheet 08: prescribed fire costs

    Treesearch

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    Although the use of prescribed fire as a management tool is widespread, there is great variability and uncertainty in the treatment costs. Given specific site variables and management objectives, how much will it cost to use prescribed fire? This paper describes the FASTRACS database, a tool that has been developed to aid managers in addressing this question.

  20. Wilderness science in a time of change conference-Volume 4: Wilderness visitors, experiences, and visitor management; 1999 May 23-27; Missoula, MT

    Treesearch

    David N. Cole; Stephen F. McCool; William T. Borrie; Jennifer O' Loughlin

    2000-01-01

    Thirty-seven papers are presented on wilderness visitors, experiences, and visitor management. Three overview papers synthesize knowledge and research about wilderness visitors, management of visitor experiences, and wilderness recreation planning. Other papers contain the results of specific research projects on wilderness visitors, information and education, and...

  1. Incorporating Green Infrastructure into Water Resources Management Plans to Address Water Quality Impairments

    NASA Astrophysics Data System (ADS)

    Piscopo, A. N.; Detenbeck, N. E.

    2017-12-01

    Managers of urban watersheds with excessive nutrient loads are more frequently turning to green infrastructure (GI) to manage their water quality impairments. The effectiveness of GI is dependent on a number of factors, including (1) the type and placement of GI within the watershed, (2) the specific nutrients to be treated, and (3) the uncertainty in future climates. Although many studies have investigated the effectiveness of individual GI units for different types of nutrients, relatively few have considered the effectiveness of GI on a watershed scale, the scale most relevant to management plans. At the watershed scale, endless combinations of GI type and location are possible, each with different effectiveness in reducing nutrient loads, minimizing costs, and maximizing co-benefits such as reducing runoff. To efficiently generate management plan options that balance the tradeoffs between these objectives, we simulate candidate options using EPA's Stormwater Management Model for multiple future climates and determine the Pareto optimal set of solution options using a multi-objective evolutionary algorithm. Our approach is demonstrated for an urban watershed in Rockville, Maryland.

  2. Research and technology goals and objectives for Integrated Vehicle Health Management (IVHM)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Integrated Vehicle Health Management (IVHM) is defined herein as the capability to efficiently perform checkout, testing, and monitoring of space transportation vehicles, subsystems, and components before, during, and after operational This includes the ability to perform timely status determination, diagnostics, and prognostics. IVHM must support fault-tolerant response including system/subsystem reconfiguration to prevent catastrophic failures; and IVHM must support the planning and scheduling of post-operational maintenance. The purpose of this document is to establish the rationale for IVHM and IVHM research and technology planning, and to develop technical goals and objectives. This document is prepared to provide a broad overview of IVHM for technology and advanced development activities and, more specifically, to provide a planning reference from an avionics viewpoint under the OAST Transportation Technology Program Strategic Plan.

  3. Transition Plan For the Technology Demonstration of the Joint Network Defence and Management System (JNDMS)

    DTIC Science & Technology

    2009-11-01

    Technology Demonstration of the Joint Network Defence and Management System (JNDMS) Brett Trask; Novembre 2009. Dès le départ, nous avons mis au point le... 13 5.1 System Specification... 13 5.1.1 Scope ............................................................................................................. 13 5.2 Security

  4. Thinking About Oak Forests as Responsive Ecosystems

    Treesearch

    Paul S. Johnson

    2004-01-01

    Like all forests, oak forests are continually responding to disturbances originating from both within and outside the forest. Oaks (Quercus spp.) owe their very existence to disturbance. In this context, silvicultural and other manage-ment practices can be thought of as planned disturbances designed to direct forest change in specific ways. The...

  5. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  6. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  7. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  8. 15 CFR 921.21 - Initial acquisition and development awards.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... implementing the NOAA approved draft management plan, hiring a Reserve manager and other staff as necessary and..., minor construction activities, consistent with paragraph (c) of this section also are allowed. The NOAA... acquisition and development award may be expended on such activities. NOAA must make a specific determination...

  9. A transportation-scheduling system for managing silvicultural projects

    Treesearch

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  10. 40 CFR 130.0 - Program summary and purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management decisions which are necessary to control specific sources of pollution. The plans recommend..., 205(j), non-construction management 205(g), 208, 303 and 305 of the Clean Water Act. The Water Quality... the chemical, physical and biological data needed to determine the present quality of a State's waters...

  11. Sequential use of simulation and optimization in analysis and planning

    Treesearch

    Hans R. Zuuring; Jimmie D. Chew; J. Greg Jones

    2000-01-01

    Management activities are analyzed at landscape scales employing both simulation and optimization. SIMPPLLE, a stochastic simulation modeling system, is initially applied to assess the risks associated with a specific natural process occurring on the current landscape without management treatments, but with fire suppression. These simulation results are input into...

  12. Small Business Management. Part I, A Suggested Course Outline.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Bureau of Continuing Education Curriculum Development.

    In this curriculum guide on small business management, lessons (including specific course content and teaching suggestions) are developed around general traits and practices conducive to success in small businesses, loans and other sources of capital, budgeting and planning, recordkeeping, marketing and selling, advertising and sales promotion,…

  13. Environmental Technology Verification Program Quality Management Plan, Version 3.0

    EPA Science Inventory

    The ETV QMP is a document that addresses specific policies and procedures that have been established for managing quality-related activities in the ETV program. It is the “blueprint” that defines an organization’s QA policies and procedures; the criteria for and areas of QA appli...

  14. 77 FR 46112 - Call for Nominations for Advisory Groups, Oregon/Washington

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... Steens Mountain Advisory Council. Citizens who serve on these groups provide advice and recommendations to the BLM on land use planning and management of the National System of Public Lands within their geographic areas and management options for a specific National Landscape Conservation System site. The BLM...

  15. 75 FR 9590 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... current agenda): Progress to Cleanup. InSitu Grouting--Work Plan Follow-up Discussion. Experimental... meeting be announced in the Federal Register. DATES: Tuesday, March 16, 2010, 8 a.m.-5 p.m. Opportunities... in the areas of environmental restoration, waste management, and related activities. Tentative Topics...

  16. Improving Program Performance through Management Information. A Workbook.

    ERIC Educational Resources Information Center

    Bienia, Nancy

    Designed specifically for state and local managers and supervisors who plan, direct, and operate child support enforcement programs, this workbook provides a four-part, step-by-step process for identifying needed information and methods of using the information to operate an effective program. The process consists of: (1) determining what…

  17. Common occupational classification system - revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stahlman, E.J.; Lewis, R.E.

    1996-05-01

    Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less

  18. Phase II -- Photovoltaics for Utility Scale Applications (PVUSA): Safety and health action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, K.

    1994-09-01

    To establish guidelines for the implementation and administration of an injury and illness prevention program for PVUSA and to assign specific responsibilities for the execution of the program. To provide a basic Safety and Health Action Plan (hereinafter referred to as Plan) that assists management, supervision, and project personnel in the recognition, evaluation, and control of hazardous activities and/or conditions within their respective areas of responsibility.

  19. Self-Management for People with Multiple Sclerosis

    PubMed Central

    Fraser, Robert; Ehde, Dawn; Amtmann, Dagmar; Johnson, Kurt L.; Johnson, Erica; Kraft, George H.

    2013-01-01

    People with multiple sclerosis (MS) must manage the day-to-day effects of the disease on their lives. Self-management interventions may be helpful in this challenge. An international, multidisciplinary consensus conference was held on November 15, 2010, by the University of Washington's Rehabilitation Research and Training Center for Multiple Sclerosis (MS RRTC), with funding from the Consortium of Multiple Sclerosis Centers (CMSC) and the National Institute on Disability and Rehabilitation Research (NIDRR), to discuss the concept of self-management for people with MS. The specific goals of the consensus conference were as follows: 1) review the current research on self-management and related issues in chronic disability and specifically in MS; 2) review optimal research methodologies, outcome measurement tools, program planning frameworks, and dissemination strategies for self-management research; and 3) establish recommendations on the next steps necessary to develop, adapt, and test self-management interventions for people with MS. The consensus conference and this document are the initial steps toward achieving the stated goals. Participants in the consensus conference concluded that it is necessary to: 1) define an empirically based conceptual model of self-management for people with MS; 2) establish reliable and valid self-management outcome measures; 3) use best practices to validate models of self-management interventions; and 4) plan dissemination and knowledge translation of interventions once their effectiveness is established. PMID:24453769

  20. Implementation of the Large-Scale Operations Management Test in the State of Washington.

    DTIC Science & Technology

    1982-12-01

    During FY 79, the U.S. Army Engineer Waterways Experiment Station (WES), Vicksburg, Miss., completed the first phase of its 3-year Large-Scale Operations Management Test (LSOMT). The LSOMT was designed to develop an operational plan to identify methodologies that can be implemented by the U.S. Army Engineer District, Seattle (NPS), to prevent the exotic aquatic macrophyte Eurasian watermilfoil (Myrophyllum spicatum L.) from reaching problem-level proportions in water bodies in the state of Washington. The WES developed specific plans as integral elements

  1. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness.

    PubMed

    Tistad, Malin; Palmcrantz, Susanne; Wallin, Lars; Ehrenberg, Anna; Olsson, Christina B; Tomson, Göran; Holmqvist, Lotta Widén; Gifford, Wendy; Eldh, Ann Catrine

    2016-04-11

    Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs), yet little is known about interventions aiming to develop managers' leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention's potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a four-month leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers' behaviors or clinical practice at the units. Future interventions directed towards managers should have a stronger focus on developing leadership skills and behaviors to tailor implementation plans and support implementation of CPG recommendations. © 2016 by Kerman University of Medical Sciences

  2. Household waste compositional analysis variation from insular communities in the framework of waste prevention strategy plans.

    PubMed

    Zorpas, Antonis A; Lasaridi, Katia; Voukkali, Irene; Loizia, Pantelitsa; Chroni, Christina

    2015-04-01

    Waste management planning requires reliable data regarding waste generation, affecting factors on waste generation and forecasts of waste quantities based on facts. In order to decrease the environmental impacts of waste management the choice of prevention plan as well as the treatment method must be based on the features of the waste that are produced in a specific area. Factors such as culture, economic development, climate, and energy sources have an impact on waste composition; composition influences the need of collecting waste more or less frequently of waste collection and disposition. The research question was to discover the main barriers concerning the compositional analysis in Insular Communities under warm climate conditions and the findings from this study enabled the main contents of a waste management plan to be established. These included advice to residents on waste minimisation, liaison with stakeholders and the expansion of kerbside recycling schemes. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. [Implementation of a safety and health planning system in a teaching hospital].

    PubMed

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  4. Current and future directions in Medi-Cal chronic disease care management: a view from the top.

    PubMed

    Goldman, L Elizabeth; Handley, Margaret; Rundall, Thomas G; Schillinger, Dean

    2007-05-01

    To determine the extent to which Medicaid managed care (MMC) organizations are engaged in chronic disease care management (CDCM), tailor CDCM for diverse populations, or plan to expand CDCM. Web-based survey of 23 eligible California MMC health plan executives in fall 2005. Frequency distributions of survey responses. Nineteen (83%) of 23 executives responded, representing 2.5 million beneficiaries. Eighteen (95%) MMC plans reported implementing 1 or more elements of CDCM. Although plans used a wide range of CDCM strategies to reach performance goals, most implemented provider awareness activities such as offering guidelines or disease-specific feedback to physician groups. More than half of the plans reported interest in expanding CDCM to include more active interventions such as disease registries, pay for performance, telephone counseling to patients, and other self-management support programs. Few plans reported tailoring their CDCM to vulnerable member populations such as those with limited literacy or limited English proficiency. Executives reported that insufficient financial resources at the plan level, lack of organizational leadership and commitment in physician organizations, and limited information technology in physician offices were barriers to CDCM expansion. California MMC health plans reported substantial interest in CDCM and a desire to increase CDCM. Representatives reported intentions to expand to strategies that more directly engage providers and patients. To ensure that the growing number of vulnerable enrollees with chronic disease receive high-quality care, policy efforts should focus on enabling MMC health plans to more consistently implement and target population-based strategies such as CDCM.

  5. Crawler Acquisition and Testing Demonstration Project Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEFIGH-PRICE, C.

    2000-10-23

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support finalmore » design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan includes the following: (1) Identification of acquisition strategy and plan to obtain a crawler based retrieval system; (2) Plan for sufficient cold testing to make a decision for W-523 and to comply with TPA Milestone M-45-03H; (3) Cost and schedule for path forward; (4) Responsibilities of the participants; and (5) The plan is supported by updated Level 1 logics, a Relative Order of Magnitude cost estimate and preliminary project schedule.« less

  6. Evaluation of the Implementation of Operations and Maintenance Programs in New Jersey Schools.

    ERIC Educational Resources Information Center

    Kominsky, John R.; Freyberg, Ronald W.; Gerber, Donald R.; Centifonti, Gary J.

    All schools are required to develop and implement an asbestos management plan (AMP). The key component of this plan is each school's operations and maintenance (O&M) program. This report outlines the importance of such programs. It describes an O&M program as an administrative framework that prescribes specific activities and work…

  7. Using foresight methods to anticipate future threats: the case of disease management.

    PubMed

    Ma, Sai; Seid, Michael

    2006-01-01

    We describe a unique foresight framework for health care managers to use in longer-term planning. This framework uses scenario-building to envision plausible alternate futures of the U.S. health care system and links those broad futures to business-model-specific "load-bearing" assumptions. Because the framework we describe simultaneously addresses very broad and very specific issues, it can be easily applied to a broad range of health care issues by using the broad framework and business-specific assumptions for the particular case at hand. We illustrate this method using the case of disease management, pointing out that although the industry continues to grow rapidly, its future also contains great uncertainties.

  8. CNES Strategic Plan 2001-2005

    NASA Astrophysics Data System (ADS)

    Janichewski, S.; Ben Aı̈m, H.

    2004-04-01

    CNES's latest strategic plan defines the French space agency's strategic focus and charts its course for the 2001-2005 timeframe. Based on a vision of how the space sector will evolve over the period up to 2010, the Strategic Plan sets out the agency's ambition for 2005: " CNES—space technology serving society". This ambition is structured around four challenges: Focusing actions on society's needs in three areas where space technology can make a major difference—environment, science and the information society and mobility. Building the foundation for success by ensuring competitive access to space and boosting basic research and technological innovation. Strengthening national and European synergies to ensure complementarity between: the ESA European framework, which is well adapted for major projects and the development of a European Space Strategy (ESS); and the national framework to support activities of national responsibility such as defence, science and technology development, and to improve competitiveness through direct international cooperation with other space agencies. Forging effective partnerships with its research and industry partners in Europe and France to enhance performance by: developing a service culture; building partnerships; concentrating on core competencies where it can most add value; improving skills and responsiveness in line with its strategic position; ensuring transparent and rigorous management of public funds. This Strategic Plan will be implemented in the 2001-2005 timeframe at all management levels. Implementation will be eased by the fact that the plan has been drawn up through a specific process designed to make internal management aware of the analysis underlying it. This will ensure that all stakeholders understand and appropriate the plan's orientations and thus play an active role in CNES' development. This process involved five successive steps: shared assessment of the space sector's evolution, providing a common baseline from which to build on CNES's vision; shared ambition, defining the agency's objectives and strategic focus; applying lines of action at each of the agency's four space centres through specifically targeted action plans at centre and process level; setting up of a monitoring and oversight structure; definition of a communication strategy to support management of change, designed to keep all CNES personnel informed about the plan and the process behind it.

  9. Evaluation of echocardiography in the management of elderly patients with heart failure.

    PubMed

    Hendry, A; Hacking, L; Langhorne, P; Vallance, R; MacDonald, J

    1999-09-01

    To determine the validity of a clinical diagnosis of systolic dysfunction in elderly patients with heart failure and assess the contribution of echocardiography to their management. 61 elderly patients with a diagnosis of heart failure in a geriatric assessment unit setting. Prospective study determining sensitivity, specificity and predictive values of a clinical and radiological diagnosis compared with echocardiographic standard. Proposed management was compared before and after echocardiography. Clinical assessment was highly sensitive (93%) but lacked specificity (32%). Combining radiological and clinical diagnoses increased specificity to 58%. Echocardiography revised the lead cardiac diagnosis for 28% of patients and influenced patient management plans for 41%. For elderly patients with heart failure, echocardiography improves diagnostic accuracy and identifies those patients with potential to benefit from angiotensin-converting enzyme inhibitors.

  10. Tsunami evacuation analysis, modelling and planning: application to the coastal area of El Salvador

    NASA Astrophysics Data System (ADS)

    Gonzalez-Riancho, Pino; Aguirre-Ayerbe, Ignacio; Aniel-Quiroga, Iñigo; Abad Herrero, Sheila; González Rodriguez, Mauricio; Larreynaga, Jeniffer; Gavidia, Francisco; Quetzalcoalt Gutiérrez, Omar; Álvarez-Gómez, Jose Antonio; Medina Santamaría, Raúl

    2014-05-01

    Advances in the understanding and prediction of tsunami impacts allow the development of risk reduction strategies for tsunami-prone areas. Conducting adequate tsunami risk assessments is essential, as the hazard, vulnerability and risk assessment results allow the identification of adequate, site-specific and vulnerability-oriented risk management options, with the formulation of a tsunami evacuation plan being one of the main expected results. An evacuation plan requires the analysis of the territory and an evaluation of the relevant elements (hazard, population, evacuation routes, and shelters), the modelling of the evacuation, and the proposal of alternatives for those communities located in areas with limited opportunities for evacuation. Evacuation plans, which are developed by the responsible authorities and decision makers, would benefit from a clear and straightforward connection between the scientific and technical information from tsunami risk assessments and the subsequent risk reduction options. Scientifically-based evacuation plans would translate into benefits for the society in terms of mortality reduction. This work presents a comprehensive framework for the formulation of tsunami evacuation plans based on tsunami vulnerability assessment and evacuation modelling. This framework considers (i) the hazard aspects (tsunami flooding characteristics and arrival time), (ii) the characteristics of the exposed area (people, shelters and road network), (iii) the current tsunami warning procedures and timing, (iv) the time needed to evacuate the population, and (v) the identification of measures to improve the evacuation process, such as the potential location for vertical evacuation shelters and alternative routes. The proposed methodological framework aims to bridge the gap between risk assessment and risk management in terms of tsunami evacuation, as it allows for an estimation of the degree of evacuation success of specific management options, as well as for the classification and prioritization of the gathered information, in order to formulate an optimal evacuation plan. The framework has been applied to the El Salvador case study through the project "Tsunami Hazard and Risk Assessment in El Salvador", funded by AECID during the period 2009-12, demonstrating its applicability to site-specific response times and population characteristics.

  11. A Technical Infrastructure to Integrate Dynamics AX ERP and CRM into University Curriculum

    ERIC Educational Resources Information Center

    Wimmer, Hayden; Hall, Kenneth

    2016-01-01

    Enterprise Resource Planning and Customer Relationship Management are becoming important topics at the university level, and are increasingly receiving course-level attention in the curriculum. In fact, the Information Systems Body of Knowledge specifically identifies Enterprise Architecture as an Information Systems-specific knowledge area. The…

  12. 76 FR 77415 - Fisheries Off West Coast States; Pacific Coast Groundfish Fishery; 2012 Specifications and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-13

    ... Specifications and Management Measures and Secretarial Amendment 1 AGENCY: National Marine Fisheries Service... Amendment 1 to the PCGFMP. Secretarial Amendment 1 contains the rebuilding plans for overfished species and new reference points for assessed flatfish species. DATES: This rule is effective January 1, 2012...

  13. Reconceptualizing the motive/environment link in recreation choice behavior

    Treesearch

    Richard Schreyer; Richard C. Knopf; Daniel R. Williams

    1985-01-01

    Effective inventory, management, and planning for recreation resources depend upon knowing why persons choose certain environments to attain specific goals, and what elements in those environments facilitate goal-attainment. Research focused on relating motives for participation to specific components in the environment has had only limited success. This paper proposes...

  14. Safe teleradiology: information assurance as project planning methodology

    NASA Astrophysics Data System (ADS)

    Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David

    2003-05-01

    This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.

  15. Predicting fire severity using surface fuels and moisture

    Treesearch

    Pamela G. Sikkink; Robert E. Keane

    2012-01-01

    Fire severity classifications have been used extensively in fire management over the last 30 years to describe specific environmental or ecological impacts of fire on fuels, vegetation, wildlife, and soils in recently burned areas. New fire severity classifications need to be more objective, predictive, and ultimately more useful to fire management and planning. Our...

  16. 75 FR 346 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... current agenda): Progress to Cleanup. InSitu Grouting--Draft Remedial Design and Remedial Action Work Plan... this meeting be announced in the Federal Register. DATES: Wednesday, January 20, 2010, 8 a.m.-5 p.m... in the areas of environmental restoration, waste management, and related activities. Tentative Topics...

  17. Building bridges: marketing managed care to ethnically diverse populations.

    PubMed

    Rosen, M B

    1996-12-01

    America's population "stew" creates specific challenges to health plans attempting to reach ethnically differentiated enrollee groups. In this article, the author provides snapshots of four ethnic groups, suggests some marketing considerations when preparing communications to these groups, and helps draw some conclusions about marketing managed care products to a culturally diverse population.

  18. Closing unprofitable services: ethical issues and management responses.

    PubMed

    Summers, James W

    1985-01-01

    Closing unprofitable services often requires as much analysis, public relations, marketing, and planning as any expansion. Further, issues about ethics, indigents, and the hospital mission force the consideration of values explicitly if a marketing fiasco is to be avoided. By integrating values analysis with more traditional management tasks, the challenges of service closure can be converted into opportunities to demonstrate how your institution has met or exceeded its ethical obligations. A case involving OB is developed to show how ethical and management issues blend into one another. Specific strategies for consensus building and marketing of the legitimacy of the hospital's position are given. Institutional ethics committees are one primary mechanism for developing a plan to benefit from unpleasant decisions.

  19. Opioid Substitution Treatment Planning in a Disaster Context: Perspectives from Emergency Management and Health Professionals in Aotearoa/New Zealand

    PubMed Central

    Blake, Denise; Lyons, Antonia

    2016-01-01

    Opioid Substitution Treatment (OST) is a harm reduction strategy enabling opiate consumers to avoid withdrawal symptoms and maintain health and wellbeing. Some research shows that within a disaster context service disruptions and infrastructure damage affect OST services, including problems with accessibility, dosing, and scripts. Currently little is known about planning for OST in the reduction and response phases of a disaster. This study aimed to identify the views of three professional groups working in Aotearoa/New Zealand about OST provision following a disaster. In-depth, semi-structured interviews were conducted with 17 service workers, health professionals, and emergency managers in OST and disaster planning fields. Thematic analysis of transcripts identified three key themes, namely “health and wellbeing”, “developing an emergency management plan”, and “stock, dose verification, and scripts” which led to an overarching concept of “service continuity in OST preparedness planning”. Participants viewed service continuity as essential for reducing physical and psychological distress for OST clients, their families, and wider communities. Alcohol and drug and OST health professionals understood the specific needs of clients, while emergency managers discussed the need for sufficient preparedness planning to minimise harm. It is concluded that OST preparedness planning must be multidisciplinary, flexible, and inclusive. PMID:27834915

  20. Developing performance measures for alcohol and other drug services in managed care plans. Washington Circle Group.

    PubMed

    McCorry, F; Garnick, D W; Bartlett, J; Cotter, F; Chalk, M

    2000-11-01

    Monitoring the quality and availability of alcohol and other drug (AOD) services must be a central tenet of any health-related performance measurement system. The Washington Circle Group (WCG), which was convened by the Center for Substance Abuse Treatment Office of Managed Care in March 1998, has developed a core set of performance measures for AOD services for public- and private-sector health plans. It is also collaborating with a broad range of stakeholders to ensure widespread adoption of these performance measures by health plans, private employers, public payers, and accrediting organizations. Four domains were identified, with specific measures developed for each domain: (1) prevention/education, (2) recognition, (3) treatment (including initiation of alcohol and other plan services, linkage of detoxification and AOD plan services, treatment engagement, and interventions for family members/significant others), and (4) maintenance of treatment effects. Four measures that are based on administrative information from health plans and two measures that require a consumer survey of behavioral health care are undergoing extensive pilot testing. The WCG has reached out to a broad range of stakeholders in performance measurement and managed care to acquaint them with the measures and to promote their investigation and adoption. As results of pilot testing become available, these outreach efforts will continue. Performance measures for AOD services need to become an integral part of a comprehensive set of behavioral and physical health performance measures for managed care plans.

  1. Improving integration for integrated coastal zone management: an eight country study.

    PubMed

    Portman, M E; Esteves, L S; Le, X Q; Khan, A Z

    2012-11-15

    Integrated coastal zone management (ICZM) is a widely accepted approach for sustainable management of the coastal environment. ICZM emphasizes integration across sectors, levels of government, uses, stakeholders, and spatial and temporal scales. While improving integration is central to progress in ICZM, the role of and the achievement of integration remain understudied. To further study these two points, our research analyzes the performance of specific mechanisms used to support ICZM in eight countries (Belgium, India, Israel, Italy, Portugal, Sweden, UK, and Vietnam). The assessment is based on a qualitative comparative analysis conducted through the use of two surveys. It focuses on five ICZM mechanisms (environmental impact assessment; planning hierarchy; setback lines; marine spatial planning, and regulatory commission) and their role in improving integration. Our findings indicate that certain mechanisms enhance specific types of integration more effectively than others. Environmental impact assessment enhances science-policy integration and can be useful to integrate knowledge across sectors. Planning hierarchy and regulatory commissions are effective mechanisms to integrate policies across government levels, with the latter also promoting public-government integration. Setback lines can be applied to enhance integration across landscape units. Marine spatial planning is a multi-faceted mechanism with the potential to promote all types of integration. Policy-makers should adopt the mechanisms that are suited to the type of integration needed. Results of this study also contribute to evidence-based coastal management by identifying the most common impediments related to the mechanisms of integration in the eight studied countries. Copyright © 2012 Elsevier B.V. All rights reserved.

  2. Installation Restoration Program Stage 3. McClellan Air Force Base Quality Assurance Project Plan

    DTIC Science & Technology

    1989-08-30

    QUALITY ASSURANCE PROJECT PLAN TDTM FINAL ELECTE C\\ JAUG 3 119891 .. .. . .. 0.. ... PREPARD.FOR HEDURTR FL/E WRGTPATRO .. F... OHI.443 ........ 1N...P.E. Contract Program Manager \\ 0 RADMAN 0 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................... 1 of 6...Section: 1.0 RADM Revision: 1 CO PO AIO NDate: 04/12/89 O Page 1 of 6 1.0 INTRODUCTION The Quality Assurance Project Plan (QAPP) presents in specific

  3. Use of theoretical waste inventories in planning and monitoring of hazardous waste management systems.

    PubMed

    Yilmaz, Ozge; Can, Zehra S; Toroz, Ismail; Dogan, Ozgur; Oncel, Salim; Alp, Emre; Dilek, Filiz B; Karanfil, Tanju; Yetis, Ulku

    2014-08-01

    Hazardous waste (HW) generation information is an absolute necessity for ensuring the proper planning, implementation, and monitoring of any waste management system. Unfortunately, environmental agencies in developing countries face difficulties in gathering data directly from the creators of such wastes. It is possible, however, to construct theoretical HW inventories using the waste generation factors (WGFs). The objective of this study was to develop a complete nationwide HW inventory of Turkey that relies on nation-specific WGFs to support management activities of the Turkish Ministry of Environment and Urbanization (MoEU). Inventory studies relied on WGFs from: (a) the literature and (b) field studies and analysis of waste declarations reflecting country-specific industrial practices. Moreover, new tools were introduced to the monitoring infrastructure of MoEU to obtain a comprehensive waste generation data set. Through field studies and a consideration of country specific conditions, it was possible to more thoroughly elucidate HW generation trends in Turkey, a method that was deemed superior to other alternatives. Declaration and literature based WGFs also proved most helpful in supplementing field observations that could not always be conducted. It was determined that these theoretical inventories could become valuable assets in supporting regulating agencies in developing countries for a more thorough implementation of HW management systems. © The Author(s) 2014.

  4. Space Station Freedom operations planning

    NASA Technical Reports Server (NTRS)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  5. Description of data base management systems activities

    NASA Technical Reports Server (NTRS)

    1983-01-01

    One of the major responsibilities of the JPL Computing and Information Services Office is to develop and maintain a JPL plan for providing computing services to the JPL management and administrative community that will lead to improved productivity. The CISO plan to accomplish this objective has been titled 'Management and Administrative Support Systems' (MASS). The MASS plan is based on the continued use of JPL's IBM 3032 Computer system for administrative computing and for the MASS functions. The current candidate administrative Data Base Management Systems required to support the MASS include ADABASE, Cullinane IDMS and TOTAL. Previous uses of administrative Data Base Systems have been applied to specific local functions rather than in a centralized manner with elements common to the many user groups. Limited capacity data base systems have been installed in microprocessor based office automation systems in a few Project and Management Offices using Ashton-Tate dBASE II. These experiences plus some other localized in house DBMS uses have provided an excellent background for developing user and system requirements for a single DBMS to support the MASS program.

  6. System configuration management plan for 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vargo, G.F. Jr.

    1994-10-11

    The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less

  7. Developing Leadership in Managers to Facilitate the Implementation of National Guideline Recommendations: A Process Evaluation of Feasibility and Usefulness

    PubMed Central

    Tistad, Malin; Palmcrantz, Susanne; Wallin, Lars; Ehrenberg, Anna; Olsson, Christina B.; Tomson, Göran; Holmqvist, Lotta Widén; Gifford, Wendy; Eldh, Ann Catrine

    2016-01-01

    Background: Previous research supports the claim that managers are vital players in the implementation of clinical practice guidelines (CPGs), yet little is known about interventions aiming to develop managers’ leadership in facilitating implementation. In this pilot study, process evaluation was employed to study the feasibility and usefulness of a leadership intervention by exploring the intervention’s potential to support managers in the implementation of national guideline recommendations for stroke care in outpatient rehabilitation. Methods: Eleven senior and frontline managers from five outpatient stroke rehabilitation centers participated in a four-month leadership intervention that included workshops, seminars, and teleconferences. The focus was on developing knowledge and skills to enhance the implementation of CPG recommendations, with a particular focus on leadership behaviors. Each dyad of managers was assigned to develop a leadership plan with specific goals and leadership behaviors for implementing three rehabilitation recommendations. Feasibility and usefulness were explored through observations and interviews with the managers and staff members prior to the intervention, and then one month and one year after the intervention. Results: Managers considered the intervention beneficial, particularly the participation of both senior and frontline managers and the focus on leadership knowledge and skills for implementing CPG recommendations. All the managers developed a leadership plan, but only two units identified goals specific to implementing the three stroke rehabilitation recommendations. Of these, only one identified leadership behaviors that support implementation. Conclusion: Managers found that the intervention was delivered in a feasible way and appreciated the focus on leadership to facilitate implementation. However, the intervention appeared to have limited impact on managers’ behaviors or clinical practice at the units. Future interventions directed towards managers should have a stronger focus on developing leadership skills and behaviors to tailor implementation plans and support implementation of CPG recommendations. PMID:27694661

  8. Business planning health-check questionnaire: a survey of first, second, third and fourth wave NHS Trusts.

    PubMed

    Bennett, A R; Banks, J M

    1999-02-01

    This paper reports the results of primary research which was carried out in July 1995 with respect to business planning within first, second, third and fourth wave National Health Service (NHS) Trusts. The purpose of the research was to examine current practice in these Trusts in three areas--namely, the levels of responsibility for business planning in general, the business planning processes applied by these Trusts, and the tools and techniques used by business planning managers in the compilation of business plans. The research, based on a 37.5% response rate, concludes that, as a general rule, business planning in first, second, third and fourth wave NHS Trusts tends to be a board-level activity, where senior managers have a job title which reflects this function. Secondly, the research shows that by far the greatest challenge for Trusts lies in the external marketplace. In areas such as patient needs forecasting, competitive (Trust) intelligence, purchaser and general practice fundholder requirements, data are difficult to acquire. Finally, the evidence suggests that there is a significant gap between what is regarded as business planning practice in the NHS and what is actually applied as best practice. The report concludes that business planning in the NHS Trusts sampled appears to be an art rather than a science, and that many assumptions made by business planning managers are founded on qualitative information rather than on specific, measurable data derived from the external and internal market.

  9. Trend analysis of key solvency ratios for health plans in Medicaid managed care.

    PubMed

    McCue, Michael J

    2013-01-01

    The focus of this article is to assess the solvency of health plans that manage Medicaid members across key plan traits, specifically Medicaid dominant or plans with more than 75 percent Medicaid members, and plans owned by publicly traded companies, and sponsored by health care providers. The study accessed National Association of Insurance Commissioners (NAIC) financial data and computed key solvency ratios for 117 Medicaid health plans over a five-year time trend from 2007 to 2011. A mean test compared the mean values for each year and for the entire study period on risk-based capital (RBC), cash-flow margin and debt to total capital ratios across these plan traits. For all years except 2008 Medicaid dominant plans had a lower RBC ratio for all four out of five years. Cash-flow margin ratio for Medicaid dominant plans was only lower in 2011 than non-Medicaid dominant plans. From 2007 to 2010, debt to total capital was higher for plans owned by publicly traded companies than non-publicly traded companies. Given the potential for an expanding Medicaid market, Medicaid health plans have reduced their risk of insolvency by increasing the RBC over time and reducing their debt capital. However between 2010 and 2011 cash-flow margin ratio decreased by almost 180 basis points for Medicaid dominant plans.

  10. Aging management program of the reactor building concrete at Point Lepreau Generating Station

    NASA Astrophysics Data System (ADS)

    Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.

    2011-04-01

    In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.

  11. Concrescent Conversation as a Group Communication Tool in a Chinese University MBA Course

    ERIC Educational Resources Information Center

    Akan, Obasi Haki; Andres, Hayward; Medley, Barbara C.

    2014-01-01

    In order to be more competitive in the global marketplace, China has adopted a long-term plan to reform their higher education system. One specific aim of this plan is to facilitate the achievement of China's goal of building a world-class market-driven economy through the development of an adequate supply of MBA-trained professional managers to…

  12. Integrating bird-habitat modeling into national forest planning for bird conservation in the southern Appalachians

    Treesearch

    David A. Buehler; Eric T. Linder; Kathleen E. Franzreb; Nathan A. Klaus; Randy Dettmers; John G. Bartlett

    2005-01-01

    We developed spatially-explicit bird-habitat models with a variety of site-specific and landscape parameters to predict avian species distributions on southern Appalachian National Forests to aid National Forests with bird conservation planning. These models can be used to assess the effects of different forest management alternatives on long-term population viability...

  13. Marsh management plans in practice: Do they work in coastal Louisiana, USA?

    NASA Astrophysics Data System (ADS)

    Cowan, James H.; Turner, R. Eugene; Cahoon, Donald R.

    1988-01-01

    Louisiana's coastal wetlands represent about 41% of the nation's total and are extensively managed for fish, fur, and waterfowl. Marsh management plans (MMPs) are currently used to avoid potential user conflicts and are believed to be a best management practice for specific management goals. In this article, we define MMPs and examine their variety, history, impacts, and future. A MMP is an organized written plan submitted to state and federal permitting agencies for approval and whose purpose is to regulate wetland habitat quantity and quality (control land loss and enhance productivity). MMPs are usually implemented by making structural modifications in the marsh, primarily by using a variety of water control structures in levees to impound or semi-impound managed areas. It appears that MMPs using impoundments are only marginally successful in achieving and often contradict management goals. Although 20% of coastal Louisiana may be in MMPs by the year 2000, conflict resolution of public and private goals is compromised by a surfeit of opinion and dearth of data and experience. Based on interpretation of these results, we believe the next phase of management should include scientific studies of actual impacts, utilization of post-construction monitoring data, inventory of existing MMPs, development of new techniques, and determination of cumulative impacts.

  14. Department of Commerce Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... Fishery Management 0648-AY50 Plan 284 Fishing Year 2010 Atlantic Deep-Sea Red Crab Specifications 0648...-AY82 Inseason Adjustments 290 Inseason Adjustment to the FY 2010 Atlantic Deep Sea Red Crab...

  15. 78 FR 56871 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... Register. DATES: Wednesday, October 2, 2013, 6:00 p.m. ADDRESSES: Ohio State University, Endeavor Center...] Annual Executive Planning and Leadership Training Session Update Subcommittee Updates Election of Chair...

  16. Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success

    NASA Astrophysics Data System (ADS)

    Perera, Jeevan; Holsomback, Jerry D.

    2005-12-01

    Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.

  17. TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BURBANK, D.A.

    This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less

  18. Integrating emergency services in an urban health system.

    PubMed

    Radloff, D; Blouin, A S; Larsen, L; Kripp, M E

    2000-03-01

    When planning for growth and management efficiency across urban health systems, economic and market factors present significant service line challenges and opportunities. This article describes the evolutionary integration of emergency services in St John Health System, a large, religious-sponsored health care system located in Detroit, Michigan. Critical business elements, including the System's vision, mission, and economic context, are defined as the framework for site-specific and System-wide planning. The impact of managed care and market changes prompted St John's clinicians and executives to explore how integrating emergency services could create a competitive market advantage.

  19. Risk Management for Human Support Technology Development

    NASA Technical Reports Server (NTRS)

    jones, Harry

    2005-01-01

    NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.

  20. Re-engineering the Federal planning process: A total Federal planning strategy, integrating NEPA with modern management tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eccleston, C.H.

    1997-09-05

    The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed formore » unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.« less

  1. Testing the robustness of management decisions to uncertainty: Everglades restoration scenarios.

    PubMed

    Fuller, Michael M; Gross, Louis J; Duke-Sylvester, Scott M; Palmer, Mark

    2008-04-01

    To effectively manage large natural reserves, resource managers must prepare for future contingencies while balancing the often conflicting priorities of different stakeholders. To deal with these issues, managers routinely employ models to project the response of ecosystems to different scenarios that represent alternative management plans or environmental forecasts. Scenario analysis is often used to rank such alternatives to aid the decision making process. However, model projections are subject to uncertainty in assumptions about model structure, parameter values, environmental inputs, and subcomponent interactions. We introduce an approach for testing the robustness of model-based management decisions to the uncertainty inherent in complex ecological models and their inputs. We use relative assessment to quantify the relative impacts of uncertainty on scenario ranking. To illustrate our approach we consider uncertainty in parameter values and uncertainty in input data, with specific examples drawn from the Florida Everglades restoration project. Our examples focus on two alternative 30-year hydrologic management plans that were ranked according to their overall impacts on wildlife habitat potential. We tested the assumption that varying the parameter settings and inputs of habitat index models does not change the rank order of the hydrologic plans. We compared the average projected index of habitat potential for four endemic species and two wading-bird guilds to rank the plans, accounting for variations in parameter settings and water level inputs associated with hypothetical future climates. Indices of habitat potential were based on projections from spatially explicit models that are closely tied to hydrology. For the American alligator, the rank order of the hydrologic plans was unaffected by substantial variation in model parameters. By contrast, simulated major shifts in water levels led to reversals in the ranks of the hydrologic plans in 24.1-30.6% of the projections for the wading bird guilds and several individual species. By exposing the differential effects of uncertainty, relative assessment can help resource managers assess the robustness of scenario choice in model-based policy decisions.

  2. Before Five: Early Childhood Care and Education in New Zealand.

    ERIC Educational Resources Information Center

    New Zealand Dept. of Education, Wellington.

    This publication outlines the Government of New Zealand's new plans and policies for the administration of early childhood care and education. Specific features are discussed in detail in sections concerning: (1) early childhood care and education at the local level, specifically management structures and responsibilities, the use of Crown land,…

  3. Department of Transportation - Civil Emergency Preparedness Policies and Program(s)

    DOT National Transportation Integrated Search

    1984-03-15

    This Order establishes policies, programs, and procedures; and identifies : and assigns specific emergency preparedness responsibilities to Departmental elements for the planning, management, and coordination of the Department of Transportation civil...

  4. 78 FR 69657 - Environmental Management Site-Specific Advisory Board, Portsmouth

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Register. DATES: Thursday, December 5, 2013, 6:00 p.m. ADDRESSES: Ohio State University, Endeavor Center...] Annual Executive Planning and Leadership Training Session Update [cir] EM National Chairs Meeting Update...

  5. 77 FR 48131 - Environmental Management Site-Specific Advisory Board, Hanford

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ...: Red Lion Hotel, 1101 North Columbia Center Boulevard, Kennewick, WA 99336. FOR FURTHER INFORMATION... Priorities and HAB Work Plan Priorities 2013 HAB Meeting Calendar Board Business [cir] HAB Budget [cir...

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tor, Osman Bulent; Shahidehpour, Mohammad

    In moving toward restructuring, transmission expansion planning is a major challenge. The authors offer a general perspective on TEP issues, then address the specific challenges in Turkey and propose several strategies toward managing physical and financial risks in that country. (author)

  7. Perceptions of Community College Presidents: Total Quality Management Performance Measures at Their Colleges

    ERIC Educational Resources Information Center

    Riccardi, Mark T.

    2009-01-01

    Continuous Quality Improvement (CQI) measures such as Total Quality Management (TQM), Strategic Planning, Six Sigma, and the Balanced Scorecard are often met with skepticism among leaders of higher education. This study attempts to fill a gap in the literature regarding the study of relationships among specific variables, or building blocks,…

  8. Developing fire management mixes for fire program planning

    Treesearch

    Armando González-Cabán; Patricia B. Shinkle; Thomas J. Mills

    1986-01-01

    Evaluating economic efficiency of fire management program options requires information on the firefighting inputs, such as vehicles and crews, that would be needed to execute the program option selected. An algorithm was developed to translate automatically dollars allocated to type of firefighting inputs to numbers of units, using a set of weights for a specific fire...

  9. Emergency management in health: key issues and challenges in the UK.

    PubMed

    Lee, Andrew C K; Phillips, Wendy; Challen, Kirsty; Goodacre, Steve

    2012-10-19

    Emergency planning in the UK has grown considerably in recent years, galvanised by the threat of terrorism. However, deficiencies in NHS emergency planning were identified and the evidence-base that underpins it is questionable. Inconsistencies in terminologies and concepts also exist. Different models of emergency management exist internationally but the optimal system is unknown. This study examines the evidence-base and evidence requirements for emergency planning in the UK health context. The study involved semi-structured interviews with key stakeholders and opinion leaders. Purposive sampling was used to obtain a breadth of views from various agencies involved in emergency planning and response. Interviews were then analysed using a grounded approach using standard framework analysis techniques. We conducted 17 key informant interviews. Interviewees identified greater gaps in operational than technical aspects of emergency planning. Social and behavioural knowledge gaps were highlighted with regards to how individuals and organisations deal with risk and behave in emergencies. Evidence-based approaches to public engagement and for developing community resilience to disasters are lacking. Other gaps included how knowledge was developed and used. Conflicting views with regards to the optimal configuration and operation of the emergency management system were voiced. Four thematic categories for future research emerged:(i) Knowledge-base for emergency management: Further exploration is needed of how knowledge is acquired, valued, disseminated, adopted and retained.(ii) Social and behavioural issues: Greater understanding of how individuals approach risk and behave in emergencies is required.(iii) Organisational issues in emergencies: Several conflicting organisational issues were identified; value of planning versus plans, flexible versus standardized procedures, top-down versus bottom-up engagement, generic versus specific planning, and reactive versus proactive approaches to emergencies.(iv) Emergency management system: More study is required of system-wide issues relating to system configuration and operation, public engagement, and how emergency planning is assessed.

  10. Data categories for marine planning

    USGS Publications Warehouse

    Lightsom, Frances L.; Cicchetti, Giancarlo; Wahle, Charles M.

    2015-01-01

    The U.S. National Ocean Policy calls for a science- and ecosystem-based approach to comprehensive planning and management of human activities and their impacts on America’s oceans. The Ocean Community in Data.gov is an outcome of 2010–2011 work by an interagency working group charged with designing a national information management system to support ocean planning. Within the working group, a smaller team developed a list of the data categories specifically relevant to marine planning. This set of categories is an important consensus statement of the breadth of information types required for ocean planning from a national, multidisciplinary perspective. Although the categories were described in a working document in 2011, they have not yet been fully implemented explicitly in online services or geospatial metadata, in part because authoritative definitions were not created formally. This document describes the purpose of the data categories, provides definitions, and identifies relations among the categories and between the categories and external standards. It is intended to be used by ocean data providers, managers, and users in order to provide a transparent and consistent framework for organizing and describing complex information about marine ecosystems and their connections to humans.

  11. Health and Safety Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoesen, S.D.; Clark, C. Jr.; Burman, S.N.

    1993-12-01

    The Martin Marietta Energy Systems, Inc. (Energy Systems), policy is to provide a safe and healthful workplace for all employees and subcontractors. The accomplishment of this policy requires that operations at Waste Area Grouping (WAG) 6 at the Department of Energy (DOE) Oak Ridge National Laboratory are guided by an overall plan and consistent proactive approach to safety and health (S&H) issues. The plan is written to utilize past experience and best management practices to minimize hazards to human health or the environment from events such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactivemore » materials to air, soil, or surface water This plan explains additional site-specific health and safety requirements such as Site Specific Hazards Evaluation Addendums (SSHEAs) to the Site Safety and Health Plan which should be used in concert with this plan and existing established procedures.« less

  12. [Discussion on developing a data management plan and its key factors in clinical study based on electronic data capture system].

    PubMed

    Li, Qing-na; Huang, Xiu-ling; Gao, Rui; Lu, Fang

    2012-08-01

    Data management has significant impact on the quality control of clinical studies. Every clinical study should have a data management plan to provide overall work instructions and ensure that all of these tasks are completed according to the Good Clinical Data Management Practice (GCDMP). Meanwhile, the data management plan (DMP) is an auditable document requested by regulatory inspectors and must be written in a manner that is realistic and of high quality. The significance of DMP, the minimum standards and the best practices provided by GCDMP, the main contents of DMP based on electronic data capture (EDC) and some key factors of DMP influencing the quality of clinical study were elaborated in this paper. Specifically, DMP generally consists of 15 parts, namely, the approval page, the protocol summary, role and training, timelines, database design, creation, maintenance and security, data entry, data validation, quality control and quality assurance, the management of external data, serious adverse event data reconciliation, coding, database lock, data management reports, the communication plan and the abbreviated terms. Among them, the following three parts are regarded as the key factors: designing a standardized database of the clinical study, entering data in time and cleansing data efficiently. In the last part of this article, the authors also analyzed the problems in clinical research of traditional Chinese medicine using the EDC system and put forward some suggestions for improvement.

  13. Integrating Climate Change into Habitat Conservation Plans Under the U.S. Endangered Species Act

    NASA Astrophysics Data System (ADS)

    Bernazzani, Paola; Bradley, Bethany A.; Opperman, Jeffrey J.

    2012-06-01

    Habitat Conservation Plans (HCPs) under the Endangered Species Act (ESA) are an important mechanism for the acquisition of land and the management of terrestrial and aquatic ecosystems. HCPs have become a vital means of protecting endangered and threatened species and their habitats throughout the United States, particularly on private land. The scientific consensus that climate is changing and that these changes will impact the viability of species has not been incorporated into the conservation strategies of recent HCPs, rendering plans vulnerable biologically. In this paper we review the regulatory context for incorporating climate change into HCPs and analyze the extent to which climate change is linked to management actions in a subset of large HCPs. We conclude that most current plans do not incorporate climate change into conservation actions, and so we provide recommendations for integrating climate change into the process of HCP development and implementation. These recommendations are distilled from the published literature as well as the practice of conservation planning and are structured to the specific needs of HCP development and implementation. We offer nine recommendations for integrating climate change into the HCP process: (1) identify species at-risk from climate change, (2) explore new strategies for reserve design, (3) increase emphasis on corridors, linkages, and connectivity, (4) develop anticipatory adaptation measures, (5) manage for diversity, (6) consider assisted migration, (7) include climate change in scenarios of water management, (8) develop future-oriented management actions, and (9) increase linkages between the conservation strategy and adaptive management/monitoring programs.

  14. Integrating climate change into habitat conservation plans under the U.S. endangered species act.

    PubMed

    Bernazzani, Paola; Bradley, Bethany A; Opperman, Jeffrey J

    2012-06-01

    Habitat Conservation Plans (HCPs) under the Endangered Species Act (ESA) are an important mechanism for the acquisition of land and the management of terrestrial and aquatic ecosystems. HCPs have become a vital means of protecting endangered and threatened species and their habitats throughout the United States, particularly on private land. The scientific consensus that climate is changing and that these changes will impact the viability of species has not been incorporated into the conservation strategies of recent HCPs, rendering plans vulnerable biologically. In this paper we review the regulatory context for incorporating climate change into HCPs and analyze the extent to which climate change is linked to management actions in a subset of large HCPs. We conclude that most current plans do not incorporate climate change into conservation actions, and so we provide recommendations for integrating climate change into the process of HCP development and implementation. These recommendations are distilled from the published literature as well as the practice of conservation planning and are structured to the specific needs of HCP development and implementation. We offer nine recommendations for integrating climate change into the HCP process: (1) identify species at-risk from climate change, (2) explore new strategies for reserve design, (3) increase emphasis on corridors, linkages, and connectivity, (4) develop anticipatory adaptation measures, (5) manage for diversity, (6) consider assisted migration, (7) include climate change in scenarios of water management, (8) develop future-oriented management actions, and (9) increase linkages between the conservation strategy and adaptive management/monitoring programs.

  15. The advancement of a new human factors report--'The Unique Report'--facilitating flight crew auditing of performance/operations as part of an airline's safety management system.

    PubMed

    Leva, M C; Cahill, J; Kay, A M; Losa, G; McDonald, N

    2010-02-01

    This paper presents the findings of research relating to the specification of a new human factors report, conducted as part of the work requirements for the Human Integration into the Lifecycle of Aviation Systems project, sponsored by the European Commission. Specifically, it describes the proposed concept for a unique report, which will form the basis for all operational and safety reports completed by flight crew. This includes all mandatory and optional reports. Critically, this form is central to the advancement of improved processes and technology tools, supporting airline performance management, safety management, organisational learning and knowledge integration/information-sharing activities. Specifically, this paper describes the background to the development of this reporting form, the logic and contents of this form and how reporting data will be made use of by airline personnel. This includes a description of the proposed intelligent planning process and the associated intelligent flight plan concept, which makes use of airline operational and safety analyses information. Primarily, this new reporting form has been developed in collaboration with a major Spanish airline. In addition, it has involved research with five other airlines. Overall, this has involved extensive field research, collaborative prototyping and evaluation of new reports/flight plan concepts and a number of evaluation activities. Participants have included both operational and management personnel, across different airline flight operations processes. Statement of Relevance: This paper presents the development of a reporting concept outlined through field research and collaborative prototyping within an airline. The resulting reporting function, embedded in the journey log compiled at the end of each flight, aims at enabling employees to audit the operations of the company they work for.

  16. Mining level of control in medical organizations.

    PubMed

    Çalimli, Olgu; Türkeli, Serkan; Eken, Emir Gökberk; Gönen, Halil Emre

    2014-01-01

    In literature of strategic management, there are three layers of control defined in organizational structures. These layers are strategic, tactical and operational, in which resides senior, medium level and low level managers respectively. In strategic level, institutional strategies are determined according to senior managers' perceived state of organization. In tactical level, this strategy is processed into methods and activities of a business management plan. Operational level embodies actions and functions to sustain specified business management plan. An acknowledged lead organization in Turkish medical area is examined using case study and data mining method in the scope of this paper. The level of decisions regarded in managerial purposes evaluated through chosen organization's business intelligence event logs report. Hence specification of management level importance of medical organizations is made. Case study, data mining and descriptive statistical method of taken case's reports present that positions of "Chief Executive Officer", "Outpatient Center Manager", "General Manager", monitored and analyzed functions of operational level management more frequently than strategic and tactical level. Absence of strategic management decision level research in medical area distinguishes this paper and consequently substantiates its significant contribution.

  17. NASA Software Documentation Standard

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The NASA Software Documentation Standard (hereinafter referred to as "Standard") is designed to support the documentation of all software developed for NASA; its goal is to provide a framework and model for recording the essential information needed throughout the development life cycle and maintenance of a software system. The NASA Software Documentation Standard can be applied to the documentation of all NASA software. The Standard is limited to documentation format and content requirements. It does not mandate specific management, engineering, or assurance standards or techniques. This Standard defines the format and content of documentation for software acquisition, development, and sustaining engineering. Format requirements address where information shall be recorded and content requirements address what information shall be recorded. This Standard provides a framework to allow consistency of documentation across NASA and visibility into the completeness of project documentation. The basic framework consists of four major sections (or volumes). The Management Plan contains all planning and business aspects of a software project, including engineering and assurance planning. The Product Specification contains all technical engineering information, including software requirements and design. The Assurance and Test Procedures contains all technical assurance information, including Test, Quality Assurance (QA), and Verification and Validation (V&V). The Management, Engineering, and Assurance Reports is the library and/or listing of all project reports.

  18. A systems engineering management approach to resource management applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda Shaller

    1989-01-01

    The author presents a program management response to the following question: How can the traditional practice of systems engineering management, including requirements specification, be adapted, enhanced, or modified to build future planning and scheduling systems for effective operations? The systems engineering management process, as traditionally practiced, is examined. Extensible resource management systems are discussed. It is concluded that extensible systems are a partial solution to problems presented by requirements that are incomplete, partially immeasurable, and often dynamic. There are positive indications that resource management systems have been characterized and modeled sufficiently to allow their implementation as extensible systems.

  19. Training Community Modeling and Simulation Business Plan: 2009 Edition

    DTIC Science & Technology

    2010-04-01

    strategic information assurance 33 33 Provide crisis action procedures training 34 34 Provide the IC SOF-specific training at the operational level... information and products • Collaborative analysis processes • Dissemination of information throughout a command and to subordinates by redundant means...centric M&S capabilities will improve training for information warfare, assist with training for homeland defense operations, crisis -management plan- ning

  20. Let's Reduce and Recycle: Curriculum for Solid Waste Awareness. Lesson Plans for Grades K-6 and 7-12. Revised.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    The purpose of this guide is to educate young people about the problems associated with solid waste. The activities encourage them to think about options for reducing the amount of waste they generate and how they can help by recycling and learning about other waste management alternatives. The lesson plans deal specifically with garbage and…

  1. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less

  2. Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

  3. Concussion management in United States college sports: compliance with National Collegiate Athletic Association concussion policy and areas for improvement.

    PubMed

    Baugh, Christine M; Kroshus, Emily; Daneshvar, Daniel H; Filali, Naji A; Hiscox, Michael J; Glantz, Leonard H

    2015-01-01

    In 2010, the National Collegiate Athletic Association (NCAA) adopted its Concussion Policy and Legislation, which applies to more than 450,000 collegiate athletes annually. To date, there has been no examination of school-level compliance with the NCAA Concussion Policy. To examine whether stakeholders at NCAA schools report that their school has a concussion management plan and whether existing plans are consistent with the NCAA policy. Also examined were stakeholders' perceptions regarding concussion management at their institution and possible areas for improvement. Cross-sectional study; Level of evidence, 3. Surveys were sent by e-mail to coaches, sports medicine clinicians, and compliance administrators at all 1066 NCAA member institutions. Surveys asked population-specific questions about institutional concussion management. Individuals (N=2880) from 907 unique schools participated in this survey. Most respondents (n=2607; 92.7%) indicated their school had a concussion management plan. Most schools had all (82.1%) or some (15.2%) respondents indicate a concussion management plan was present. When asked to indicate all individuals who could have final responsibility for returning athletes to play after a concussion, 83.4% selected team doctor, 72.8% athletic trainer, 31.0% specialist physician, 6.8% coach, and 6.6% athlete. Most respondents (76.1%) indicated that their institution had a process for annual athlete concussion education; 91.2% required athletes to acknowledge their responsibility to report concussion symptoms. Nearly all respondents (98.8%) thought their school's concussion management plan protected athletes "well" or "very well." Top categories suggested for improvement included better coach education (39.7%), increasing sports medicine staffing (37.2%), and better athlete education (35.2%). Although a large majority of respondents indicated that their school has a concussion management plan, improvement is needed. Compliance with specified components (eg, annual athlete education) lags behind the presence of the plan itself, and stakeholders had suggestions for areas in which improvements are needed. Increasing scientific evidence supporting the seriousness of concussion underscores the need for the NCAA to use its regulatory capabilities to ensure that athletes' brains are safe. © 2014 The Author(s).

  4. LANDSAT-D Mission Operations Review (MOR)

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The integrated LANDSAT-D systems operation plan is presented and discussed with respect to functional elements, personnel, and procedures. Specifically, a review of the LANDSAT-D program, mission requirements and management, and flight operations is given.

  5. Brownfields Recommendations for Sustainable Site Design — Green Landscape Plan

    EPA Pesticide Factsheets

    The assessment of conditions contained in this report focuses on site-specific environmental and soil conditions that might affect recommendations related to sustainable landscaping and site design, stormwater management, and stormwater reuse.

  6. Interactive Office user's manual

    NASA Technical Reports Server (NTRS)

    Montgomery, Edward E.; Lowers, Benjamin; Nabors, Terri L.

    1990-01-01

    Given here is a user's manual for Interactive Office (IO), an executive office tool for organization and planning, written specifically for Macintosh. IO is a paperless management tool to automate a related group of individuals into one productive system.

  7. Fumigant Management Plan - Phase 1 Templates

    EPA Pesticide Factsheets

    FMPs are required by pesticide labels, so EPA provides chemical-specific soil fumigant templates and samples in PDF and Word formats. Choose the appropriate template for products containing chloropicrin, dazomet, metam sodium/potassium, or methyl bromide.

  8. Comparisons of Food and Drug Administration and European Medicines Agency risk management implementation for recent pharmaceutical approvals: report of the International Society for Pharmacoeconomics and outcomes research risk benefit management working group.

    PubMed

    Lis, Yvonne; Roberts, Melissa H; Kamble, Shital; J Guo, Jeff; Raisch, Dennis W

    2012-12-01

    1) To compare the Food and Drug Administration's (FDA's) Risk Evaluation and Mitigation Strategies (REMS) and European Medicines Agency's (EMA's) Risk Management Plan (RMP) guidances and 2) to compare REMS and RMPs for specific chemical entities and biological products. FDA, EMA, and pharmaceutical company Web sites were consulted for details pertaining to REMS and RMPs. REMS requirements include medication guides, communication plans, elements to ensure safe use, implementation systems, and specified assessment intervals. RMP requirements are increased pharmacovigilance and risk minimization activities. We compared these requirements for drugs requiring both REMS and RMPs. We identified 95 drugs on FDA's REMS list as of March 2010. Of these, there were 29 drugs (11 biologics and 18 new chemical entities) with EMA RMPs. REMS and RMPs are similar in objectives, with comparable toolkits. Both allow flexibility in product-specific actions, recognizing adverse effects of potential concern. Of the 29 drugs reviewed, REMS requirements not included in RMPs were patient medication guides (100% of the drugs), provider communication plans (38%), and routine monitoring of REMS (66%). RMP requirements not included in REMS were specific adverse event reporting (45% of the drugs), prospective registry studies (34%), prospective epidemiology studies (24%), additional trial data (28%), and Summary of Product Characteristics contraindications (76%). Both REMS and RMPs provide positive guidance for identification, monitoring, and minimization of risk to patient safety. Currently, neither agency provides specific guidance on how risk should be related to benefit either qualitatively or quantitatively. Copyright © 2012 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  9. Hospital management principles applicable to the veterinary teaching hospital.

    PubMed

    Harris, Donna L; Lloyd, James W; Marrinan, Mike

    2004-01-01

    The Skills, Knowledge, Aptitude, and Attitude (SKA) Subcommittee of the National Commission on Veterinary Economic Issues (NCVEI) has identified the need for veterinary teaching hospitals (VTH) to be at the forefront of progressive business management to serve as a model for both students and practitioners to emulate. To provide a foundation for developing a model, this study reviewed pertinent literature applicable to the management of a VTH. Much of the literature relevant to VTH management relates to work completed for the human side of medicine (academic health centers, or AHCs) or to the private sector. This review explores management practices in strategic planning, financial management, human resource management, marketing, pricing, operations, and legal issues. It is concluded that strategic management is important to provide the foundation for success in the VTH. In addition, periodic financial reports are recommended, as are the development and use of benchmarks for financial management. Establishing positive, motivating human resource practices is also suggested, along with development of a marketing plan based on a clear understanding of VTH core competencies and the market's specific needs.

  10. Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".

    PubMed

    Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine

    2016-07-01

    Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.

  11. Conceptual Model of Climate Change Impacts at LANL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dewart, Jean Marie

    Goal 9 of the LANL FY15 Site Sustainability Plan (LANL 2014a) addresses Climate Change Adaptation. As part of Goal 9, the plan reviews many of the individual programs the Laboratory has initiated over the past 20 years to address climate change impacts to LANL (e.g. Wildland Fire Management Plan, Forest Management Plan, etc.). However, at that time, LANL did not yet have a comprehensive approach to climate change adaptation. To fill this gap, the FY15 Work Plan for the LANL Long Term Strategy for Environmental Stewardship and Sustainability (LANL 2015) included a goal of (1) establishing a comprehensive conceptual modelmore » of climate change impacts at LANL and (2) establishing specific climate change indices to measure climate change and impacts at Los Alamos. Establishing a conceptual model of climate change impacts will demonstrate that the Laboratory is addressing climate change impacts in a comprehensive manner. This paper fulfills the requirement of goal 1. The establishment of specific indices of climate change at Los Alamos (goal 2), will improve our ability to determine climate change vulnerabilities and assess risk. Future work will include prioritizing risks, evaluating options/technologies/costs, and where appropriate, taking actions. To develop a comprehensive conceptual model of climate change impacts, we selected the framework provided in the National Oceanic and Atmospheric Administration (NOAA) Climate Resilience Toolkit (http://toolkit.climate.gov/).« less

  12. Strategic planning by the palliative care steering committee of the Middle East Cancer Consortium.

    PubMed

    Moore, Shannon Y; Pirrello, Rosene D; Christianson, Sonya K; Ferris, Frank D

    2011-04-01

    High quality comprehensive palliative care is a critical need for millions of patients and families, but remains only a dream in many parts of the world. The failure to do a strategic planning process is one obstacle to advancing education and pain prevention and relief. The Middle Eastern Cancer Consortium Steering Committee attendees completed an initial strategic planning process and identified "developmental steps" to advance palliative care. Underscoring the multi-disciplinary nature of comprehensive palliative care, discipline-specific planning was done (adult and pediatric cancer and medicine, pharmacy, nursing) in a separate process from country-specific planning. Delineating the layers of intersection and differences between disciplines and countries was very powerful. Finding the common strengths and weaknesses in the status quo creates the potential for a more powerful regional response to the palliative care needs. Implementing and refining these preliminary strategic plans will augment and align the efforts to advance palliative care education and pain management in the Middle East. The dream to prevent and relieve suffering for millions of patients with advanced disease will become reality with a powerful strategic planning process well implemented.

  13. Planned early delivery versus expectant management for monoamniotic twins.

    PubMed

    Shub, Alexis; Walker, Susan P

    2015-04-23

    Monoamniotic twin pregnancies are formed when a single egg is fertilised and the resulting inner cell mass splits to form twins sharing the same amniotic sac. This condition is rare and affects about one in 10,000 pregnancies overall. Monoamniotic twin pregnancies are susceptible to complications including cord entanglement, increased congenital anomalies, intrauterine growth restriction, twin-to-twin transfusion syndrome and increased perinatal mortality. All twin pregnancies also carry additional maternal risks including pre-eclampsia, anaemia, antepartum haemorrhage, postpartum haemorrhage and operative delivery.The optimal timing for the delivery of monoamniotic twins is not known. The options include 'planned early delivery' between 32 and 34 weeks, or alternatively awaiting spontaneous labour at least up until the usual time of planned delivery for other monochorionic twins (approximately 36 to 38 weeks' gestation), unless there is a specific indication for earlier delivery. To assess whether routine early delivery in monoamniotic twin pregnancies improves fetal, neonatal or maternal outcomes compared with 'expectant management'. Expectant management means awaiting spontaneous labour at least up until the usual time of planned delivery for other monochorionic twins (approximately 36 to 38 weeks' gestation in many centres), unless a specific indication for delivery occurs in the meantime, e.g. for non-reassuring antenatal testing. We searched the Cochrane Pregnancy and Childbirth Group's Trials Register (31 March 2015). Published and unpublished randomised controlled trials (including cluster-randomised trials) comparing outcomes for women and infants who were randomised to planned early delivery of a monoamniotic twin pregnancy with outcomes for women and infants who were randomised to either planned term delivery or expectant management. However, we did not identify any trials for inclusion in this review.Quasi-randomised controlled trials, trials published in abstract form only, and trials using a cross-over design are not eligible for inclusion in this review. No trials were identified by the search strategy. No trials were identified by the search strategy. Monoamniotic twins are rare, and there is insufficient randomised controlled evidence on which to draw strong conclusions about the best management. In their absence, we can refer to historical case series and expert consensus. Management plans should take into consideration the availability of high-quality neonatal care if early delivery is chosen. Women and their families should be involved in the decision making about these high-risk pregnancies.Ongoing, multicentre audits of maternal and perinatal outcomes for monoamniotic twins are needed in order to inform families and clinicians about up-to-date perinatal outcomes with contemporary obstetric practice. Research should consider the social and economic implications of planned interventions, as well as the perinatal outcomes.

  14. Prospective treatment plan-specific action limits for real-time intrafractional monitoring in surface image guided radiosurgery.

    PubMed

    Yock, Adam D; Pawlicki, Todd; Kim, Gwe-Ya

    2016-07-01

    In surface image guided radiosurgery, action limits are created to determine at what point intrafractional motion exhibited by the patient is large enough to warrant intervention. Action limit values remain constant across patients despite the fact that patient motion affects the target coverage of brain metastases differently depending on the planning technique and other treatment plan-specific factors. The purpose of this work was twofold. The first purpose was to characterize the sensitivity of single-met per iso and multimet per iso treatment plans to uncorrected patient motion. The second purpose was to describe a method to prospectively determine treatment plan-specific action limits considering this sensitivity. In their surface image guided radiosurgery technique, patient positioning is achieved with a thermoplastic mask that does not cover the patient's face. The patient's exposed face is imaged by a stereoscopic photogrammetry system. It is then compared to a reference surface and monitored throughout treatment. Seventy-two brain metastases (representing 29 patients) were used for this study. Twenty-five mets were treated individually ("single-met per iso plans"), and 47 were treated in a plan simultaneously with at least one other met ("multimet per iso plans"). For each met, the proportion of the gross tumor volume that remained within the 100% prescription isodose line was estimated under the influence of combinations of translations and rotations (0.0-3.0 mm and 0.0°-3.0°, respectively). The target volume and the prescription dose-volume were considered concentric spheres that each encompassed a volume determined from the treatment plan. Plan-specific contour plots and DVHs were created to illustrate the sensitivity of a specific lesion to uncorrected patient motion. Both single-met per iso and multimet per iso plans exhibited compromised target coverage under translations and rotations, though multimet per iso plans were considerably more sensitive to these transformations (2.3% and 39.8%, respectively). Plan-specific contour plots and DVHs were used to illustrate how size, distance from isocenter, and planning technique affect a particular met's sensitivity to motion. Stereotactic radiosurgery treatment plans that treat multiple brain metastases using a common isocenter are particularly susceptible to compromised target coverage as a result of uncorrected patient motion. The use of such a planning technique along with other treatment plan-specific factors should influence patient motion management. A graphical representation of the effect of translations and rotations on any particular plan can be generated to inform clinicians of the appropriate action limit when monitoring intrafractional motion.

  15. For your information. Management in the school setting: position statement.

    PubMed

    Zacharski, Susan; DeSisto, Marie; Pontius, Deborah; Sheets, Jodi; Richesin, Cynthia

    2013-09-01

    It is the position of the National Association of School Nurses (NASN) that the safe and effective management of allergies and anaphylaxis in schools requires a collaborative, multidisciplinary team approach. The registered professional school nurse (hereinafter referred to as the school nurse) is the leader in a comprehensive management approach that includes planning and coordination of care, educating staff, providing a safe environment, and ensuring prompt emergency response should exposure to a life-threatening allergen occur. Furthermore, NASN supports, in states where laws and regulations allow, the maintenance of stock nonpatient-specific epinephrine and physician-standing orders for school nurses to administer epinephrine in life-threatening situations in the school setting. School districts must have a clear, concise, all-inclusive policy in place to address the management of allergies in the school setting that should be reviewed annually (National School Boards Association [NSBA], 2012). This policy shall be consistent with federal and state laws, nursing practice standards, and established safe practices in accordance with evidence-based information and include development of a developmentally appropriate Individualized Healthcare Plan (IHP) and Emergency Care Plan (ECP).

  16. 76 FR 56053 - 2011-2012 Refuge-Specific Hunting and Sport Fishing Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ...(j). We sometimes grant new shot types conditional approvals until we complete all necessary studies... adds one refuge to the list of areas open for hunting and/or sport fishing and increases the activities... specific management plans for each refuge prior to opening it to hunting or sport fishing. In many cases...

  17. 77 FR 47318 - Fisheries Off West Coast States; Coastal Pelagic Species Fisheries; Annual Specifications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... (CPS) Fishery Management Plan (FMP). The 2012 maximum HG for Pacific sardine is 109,409 metric tons (mt... framework in the FMP. This framework includes a harvest control rule that determines the maximum HG, the... 109,409 metric tons (mt) for the 2012 Pacific sardine fishing year. These catch specifications are...

  18. Applying the 2012 Planning Rule to conserve species: A practitioner's reference

    Treesearch

    Gregory D. Hayward; Curtis H. Flather; Mary M. Rowland; Regis Terney; Kim Mellen-McLean; Karl D. Malcolm; Clinton McCarthy; Douglas A. Boyce

    2016-01-01

    The National Forest Management Act of 1976 (NFMA) directs managers of National Forest System (NFS) lands to "provide for diversity of plant and animal communities based on the suitability and capability of the specific land area in order to meet overall multiple-use objectives." The mandate is challenging and is embraced by the Forest Service. At the...

  19. Coaching in the Library: A Management Strategy for Achieving Excellence. Second Edition

    ERIC Educational Resources Information Center

    Metz, Ruth F.

    2010-01-01

    Experienced librarian and coach Ruth Metz outlines a focused and results-oriented plan for achieving the best results from staff members through a coaching style of management. Real-world examples and coaching scenarios specific to library work will help librarians: (1) Be both a coach and a player by learning the terminology and techniques; (2)…

  20. 78 FR 25052 - Fisheries of the Northeastern United States; Recreational Management Measures for the Summer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... striata) in U.S. waters of the Atlantic Ocean from 35 E. 13.3' N. lat. (the latitude of Cape [[Page 25053... 3 nautical miles (4.83 km) of their coasts, under the Commission's plan for summer flounder, scup... sufficiently reliable to use as the basis of management advice. The SSC recommended a 3-year specification...

  1. Toward a state landscape policy: incremental planning and management in Vermont

    Treesearch

    Mark B. Lapping

    1979-01-01

    The issue of landscape management and enhancement has been of deep concern to Vermonters for many decades. This concern, which has been institutionalized through specific policies, stems from the dual desire to maintain the unique attractiveness of rural Vermont and the need to preserve and enhance a landscape which is basic to a huge recreational and tourist industry...

  2. The Watershed TMP: a proposal to manage the redwood ecosystem under convergent environmental, economic and social goals

    Treesearch

    Frederick D. Euphrat

    2012-01-01

    Under present California Forest Practice Rules, mandated by the Legislature and codified by the State Board of Forestry, Non-industrial Timber Management Plans (NTMPs) give small landowners the flexibility to operate under a specific set of rules 'forever,' allowing short notice (3 days or less) for pre-approved harvest operations. This permit is presently...

  3. Strategies for healthcare facilities, construction, and real estate management.

    PubMed

    Lee, James G

    2012-05-01

    Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.

  4. Integrating GIS Technology With Forest Management And Habitat Assessment Efforts On Our National Forests

    Treesearch

    Joan M. Nichols; S. Arif Husain; Christos Papadas

    2000-01-01

    Research was conducted on a section of the Superior National Forest to develop and examine potential methods or approaches that may be used to integrate non-timber resources in multiple-use planning. An indicator species for old-growth conifer forests, pine marten (Martes americana), was chosen to examine potential conflicts between specific forest management practices...

  5. A silvicultural guide for northern hardwoods in the northeast

    Treesearch

    William B. Leak; Dale S. Solomon; Stanley M. Filip; Stanley M. Filip

    1969-01-01

    The purpose of this paper is to provide a practical guide to the management of northern hardwoods - principally beech, birch, and maple-in the Northeast. The guide was designed to provide the kind of information that is needed not only for long-term management planning, but also for short-term silvicultural prescriptions for specific timber stand conditions. The guide...

  6. Recreation at the Redding Resource Area in California

    Treesearch

    Patricia L. Winter

    2000-01-01

    In 1993 a cooperative study was initiated by the USDI Bureau of Land Management and the USDA Forest Service’s Pacific Southwest Research Station to study the recreational needs of visitors to the Redding Resource Area in central and northern California. The study addressed specific issues in the Redding Resource Management Plan, such as attracting recreationists from...

  7. [Impact and state of the art of regional healthcare planning and management guidelines in a local health authority of the Lazio region (Italy)].

    PubMed

    Priori, Maria Rosaria; Barbato, Angelo

    2007-01-01

    The aim of this study was to evaluate the impact of health care planning and management guidelines, elaborated by the Lazio regional healthcare authority, on the organizational structure and operational processes of local health authorities and, more specifically, of the Roma C local health authority. The guidelines are made up of three volumes and mainly describe an operational model, rather than being a set of standard references aimed at standardizing the quality of information low systems in local healthcare authorities. The guidelines are essentially a didactic text, and were elaborated by a consulting firm, Engineering Management Consulting, on behalf of the Lazio regional authority. In the first section, the main concepts are defined, while in subsequent sections, detailed models regarding the specific subject matter are described. Although the guidelines represent a useful tool in the process of converting local health authorities of the Lazio region into "business" organizations, so far they have been of use only in the first phase of assessment of different organizational models for healthcare planning and management. There is still a long way ahead towards defining standard procedures and references for describing activities and costs. This is what should hopefully be achieved briefly and which will necessarily require the introduction of a data warehouse and business intelligence software that will allow monitoring of activities and making short term predictions through the use balanced scorecards and data mining.

  8. Healthcare logistics in disaster planning and emergency management: A perspective.

    PubMed

    VanVactor, Jerry D

    2017-12-01

    This paper discusses the role of healthcare supply chain management in disaster mitigation and management. While there is an abundance of literature examining emergency management and disaster preparedness efforts across an array of industries, little information has been directed specifically toward the emergency interface, interoperability and unconventional relationships among civilian institutions and the US Department of Defense (US DoD) or supply chain operations involved therein. To address this imbalance, this paper provides US DoD healthcare supply chain managers with concepts related to communicating and planning more effectively. It is worth remembering, however, that all disasters are local - under the auspice of tiered response involving federal agencies, the principal responsibility for responding to domestic disasters and emergencies rests with the lowest level of government equipped and able to deal with the incident effectively. As such, the findings are equally applicable to institutions outside the military. It also bears repeating that every crisis is unique: there is no such thing as a uniform response for every incident. The role of the US DoD in emergency preparedness and disaster planning is changing and will continue to do so as the need for roles in support of a larger effort also continues to change.

  9. Practical anesthetic considerations in patients undergoing tracheobronchial surgeries: a clinical review of current literature

    PubMed Central

    Ahuja, Sanchit; Cohen, Barak; Hinkelbein, Jochen; Diemunsch, Pierre

    2016-01-01

    Tracheobronchial surgeries require close cooperation and extensive communication between the anesthesia providers and the surgeons. Anesthetic management of tracheal and bronchial pathologies differ basically from regular upper airways management, due access to the patients airway is limited, mostly even practically impossible for the anesthesia providers. As a consequence, the surgeon overtakes responsibility for the airway access from the anesthesia provider in the variety of the cases. Preoperative recognition of a difficult airway, detailed planning and being aware of plan B and plan C are the elementary keys to success. Providers have to be aware, that preoperative airway assessment does not always correlate with the ease of oxygenation and ventilation. Therefore, various methods have been described in the literature and several authors have adopted unique ways to manage the airways in a successful manner. With the advancement of surgical techniques over the years, anesthetic management has also evolved tremendously to match the needs. The commonly encountered conditions requiring surgical interventions include post-intubation stenosis and foreign body aspiration. In this review we will discuss the most common pathologies of tracheobronchial lesions and specific anesthetic management considerations related to them. PMID:28066624

  10. How The Australian National University's emergency management and continuity plans responded to a large-scale fire.

    PubMed

    Meehan, Bart

    2008-01-01

    On 18th January, 2003, one of the worst bushfires in the history of Australia hit the capital city, Canberra. By the time it was under control, four people were dead and more than 500 homes were destroyed. The fire also destroyed the Mount Stromlo campus of the Australian National University, the location of the Research School of Astronomy and Astrophysics. In response to the fires, the University initiated its emergency management strategy and business continuity plans. These allowed the School to recommence limited operations within two weeks of the disaster. This paper details a case study of the impact of the fire (in part using personal recollections of staff and students), and the emergency response implemented by the University. It describes the development of the University's emergency management strategy, with its emphasis on the key elements of clear chain of command and flexibility in developing an incident-specific response. The paper also provides an assessment of how the plan worked during an actual incident and some of the lessons learned, including the importance of the early response, managing the impact on people, media management, insurance and communications.

  11. A randomized trial testing the superiority of a post-discharge care management model for stroke survivors

    PubMed Central

    Allen, Kyle; Hazelett, Susan; Jarjoura, David; Hua, Keding; Wright, Kathy; Weinhardt, Janice; Kropp, Denise

    2009-01-01

    Objective To evaluate whether comprehensive post-discharge care management for stroke survivors is superior to organized acute stroke unit care with enhanced discharge planning in improving a profile of health and well-being. Methods This was a randomized trial of a comprehensive post-discharge care management intervention for ischemic stroke patients with NIH Stroke Scale scores ≥1 discharged from an acute stroke unit. An Advanced Practice Nurse (APN) performed an in-home assessment for the intervention group from which an Interdisciplinary Team developed patient-specific care plans. The APN worked with the primary care physician (PCP) and patient to implement the plan over the next 6 months. Main outcome measures The intervention and usual care groups were compared using a global and closed hypothesis testing strategy. Outcomes fell into 5 domains: 1) Neuromotor Function, 2) Institution Time or Death, 3) Quality of Life, 4) Management of Risk, and 5) Stroke Knowledge and Lifestyle. Results Treatment effect was near zero standard deviations for all but the stroke knowledge and lifestyle domain which showed a significant effect of the intervention (p=0.0003). Conclusions Post discharge care management was not more effective than organized stroke unit care with enhanced discharge planning in most domains in this population. The intervention did, however, fill a post-discharge knowledge gap. PMID:19900646

  12. Medical Readiness of the Reserve Component

    DTIC Science & Technology

    2012-01-01

    once per season) (DoDI 6025.19), whereas others (such as rabies and typhoid ) are service- and/or occupation-specific. 6 For management of risks...gender-specific tests and track only the military protective mask corrective insert. Some requirements, such as for anthrax, smallpox, and yellow fever ...occupational hazards (e.g., rabies, typhoid , hepatitis B) or for a specific planned operation due to the location or threat (e.g., anthrax, smallpox

  13. Strategies for Mentoring Pedagogical Knowledge

    ERIC Educational Resources Information Center

    Hudson, Peter

    2013-01-01

    Fundamental for mentoring a preservice teacher is the mentor's articulation of pedagogical knowledge, which in this research draws upon specific practices, viz.: planning, timetabling lessons, preparation, teaching strategies, content knowledge, problem solving, questioning, classroom management, implementation, assessment and viewpoints for…

  14. Components of Effective Diversity Training Programmes.

    ERIC Educational Resources Information Center

    Wentling, Rose Mary; Palma-Rivas, Nilda

    1999-01-01

    Interviews with 12 diversity experts uncovered components of effective diversity training programs: management commitment and support, inclusion in strategic planning, attention to specific organizational needs, qualified trainers, mandatory attendance, inclusiveness, trust and confidentiality, accountability, and clearly focused evaluation. (SK)

  15. Perturbations and 3R in carbon management.

    PubMed

    Pant, Deepak; Sharma, Virbala; Singh, Pooja; Kumar, Manoj; Giri, Anand; Singh, M P

    2017-02-01

    Perturbations in various carbon pools like biological, geological, oceanic, and missing carbon sink affect its global data, which are generally neglected or ignored in routine calculations. These natural and anthropogenic events need to be considered before projecting a sustainable carbon management plan. These plans have both general and experimental aspects. General plans should focus on (a) minimizing emission; (b) maximizing environmentally sound reuse, reduce, and recycling; (c) effective treatment; and (d) converting carbon into valuable products with atom economy. Experimental carbon management plans involving various biological and chemical techniques with limitation in terms of research level and economic feasibility. Chemical options have benefits of higher productivity and wider product range, but it suffers from its higher-energy requirements and environmental unfriendliness. In contrast to this, biological options are more selective and less energy intensive, but their productivity is very low. Hence, there is a requirement of hybrid process where the benefits of both the options, i.e., biological and chemical, can be reaped. In view of above, the proposed review targets to highlight the various perturbations in the global carbon cycle and their effects; study the currently practiced options of carbon management, specifically in light of 3R principle; and propose various new hybrid methods by compatible combinations of chemical and biological processes to develop better and safer carbon management. These methods are hypothetical so they may require further research and validations but may provide a comprehensive base for developing such management methods.

  16. PROFILE: Integrated Management to Create New Breeding Habitat for Dalmatian Pelicans (Pelecanus crispus) in Greece

    PubMed

    Pyrovetsi

    1997-09-01

    / An integrated management plan to create favorable nesting habitat for the world-endangered Dalmatian pelicans, was tested at Kerkini irrigation reservoir, a Ramsar wetland. The lake is the major wintering site of Dalmatian pelicans in Europe, where the species lives year-round without breeding. The rise of water level at the reservoir during spring (exceeding 5 m) has an impact on the whole system, including several birds, which lose their nesting habitat. Although the integrity of the wetland demands ecological restoration with changes in its hydrologic regime, local socioeconomic conditions allow only habitat level interventions. During the planning phase of the management plan, both the ecological and social context of the interventions were considered. Monitoring of all pelican habitats and populations provided the scientific basis, while a socioecological survey on knowledge/attitudes of local fishermen toward wetland identified conflicts with specific resources and planned management. To gain public support, a broad information/education program was implemented. The education program for fishermen was based on the findings of the socioecological survey. The in situ management involved experimental construction of floating rafts, platforms over water, dredged-spoil islands, and platforms at various sites of the wetland. Monitoring of the managed habitats showed that most waterbirds used them for resting and roosting. Common terns nested on the rafts, cormorants on the platforms, and Dalmatian pelicans on the man-made island. Under the prevailing hydrologic and weather conditions, islands seem to be the most suitable habitat for pelican nesting. It is concluded that wildlife habitat management should integrate the ecological component, related to the needs of the species and ecosystem, with the social one, expressed by cooperation and involvement of the local community.KEY WORDS: Integrated management; Pelican; Nesting habitat; Habitat management; Reservoir-wetland; Public participation, Greece

  17. ALARA database value in future outage work planning and dose management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D.W.; Green, W.H.

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in themore » categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.« less

  18. Using social media to assess care coordination goals and plans for leukemia patients and survivors.

    PubMed

    Strekalova, Yulia A; Hawkins, Kimberly E; Drusbosky, Leylah M; Cogle, Cristopher R

    2018-05-23

    Care coordination has been shown to have a positive effect on the management of chronic disease. Specific to the management of leukemia, coordination may occur between primary care physician, medical and radiation oncologists, surgeons, cardiologists, and genetics specialists. Experiencing gaps in communication and care coordination, many health consumers seek instrumental support in their social circles, including online forums and networks. The goal of this theory-guided study was to provide an in-depth assessment of how individuals use online forums to deliberate about their goals and plans for leukemia care coordination. Guided by the planning theory of communication, the data were collected from the American Cancer Society Cancer Survivors Network and included 125 original posts and 1,248 responses. Thematic analysis and axial coding were applied to analyze the data. Goal-related themes included overcoming the diffusion of care coordination and achieving health management cohesion. Planning themes included social health management, communication self-efficacy, and role deliberation. Online patient forums provide an interactive platform for patients and caregivers to engage in active conversations, which in turn can serve as identifiers of care coordination needs. Communication with those who share similar experiences allows cancer patients and survivors to accumulate functional health literacy, gain communication self-efficacy, and articulate a care coordination role acceptable to them.

  19. Formal Methods Specification and Verification Guidebook for Software and Computer Systems. Volume 1; Planning and Technology Insertion

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The Formal Methods Specification and Verification Guidebook for Software and Computer Systems describes a set of techniques called Formal Methods (FM), and outlines their use in the specification and verification of computer systems and software. Development of increasingly complex systems has created a need for improved specification and verification techniques. NASA's Safety and Mission Quality Office has supported the investigation of techniques such as FM, which are now an accepted method for enhancing the quality of aerospace applications. The guidebook provides information for managers and practitioners who are interested in integrating FM into an existing systems development process. Information includes technical and administrative considerations that must be addressed when establishing the use of FM on a specific project. The guidebook is intended to aid decision makers in the successful application of FM to the development of high-quality systems at reasonable cost. This is the first volume of a planned two-volume set. The current volume focuses on administrative and planning considerations for the successful application of FM.

  20. Towards Knowledge Management for Smart Manufacturing.

    PubMed

    Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard

    2017-09-01

    The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.

  1. Software engineering project management - A state-of-the-art report

    NASA Technical Reports Server (NTRS)

    Thayer, R. H.; Lehman, J. H.

    1977-01-01

    The management of software engineering projects in the aerospace industry was investigated. The survey assessed such features as contract type, specification preparation techniques, software documentation required by customers, planning and cost-estimating, quality control, the use of advanced program practices, software tools and test procedures, the education levels of project managers, programmers and analysts, work assignment, automatic software monitoring capabilities, design and coding reviews, production times, success rates, and organizational structure of the projects.

  2. DOD Financial Management: Ongoing Challenges in Implementing the Financial Improvement and Audit Readiness Plan

    DTIC Science & Technology

    2011-09-15

    programs and operations at high risk of being vulnerable to fraud, waste, and abuse.1 Despite several reform initiatives, DOD’s financial management...remains on GAO’s high- risk list today. Long- standing and pervasive weaknesses in DOD’s financial management and related business processes and systems...GAO has identified as being at high risk of waste, fraud, abuse, and mismanagement. The seven specific DOD high- risk areas are (1) approach to

  3. An Abstract Plan Preparation Language

    NASA Technical Reports Server (NTRS)

    Butler, Ricky W.; Munoz, Cesar A.

    2006-01-01

    This paper presents a new planning language that is more abstract than most existing planning languages such as the Planning Domain Definition Language (PDDL) or the New Domain Description Language (NDDL). The goal of this language is to simplify the formal analysis and specification of planning problems that are intended for safety-critical applications such as power management or automated rendezvous in future manned spacecraft. The new language has been named the Abstract Plan Preparation Language (APPL). A translator from APPL to NDDL has been developed in support of the Spacecraft Autonomy for Vehicles and Habitats Project (SAVH) sponsored by the Explorations Technology Development Program, which is seeking to mature autonomy technology for application to the new Crew Exploration Vehicle (CEV) that will replace the Space Shuttle.

  4. Scenario Planning Provides a Framework for Climate Change Adaptation in the National Park Service

    NASA Astrophysics Data System (ADS)

    Welling, L. A.

    2012-12-01

    Resource management decisions must be based on future expectations. Abundant evidence suggests climate change will have highly consequential effects on the Nation's natural and cultural resources, but specific impacts are difficult to accurately predict. This situation of too much information but not enough specificity can often lead to either paralysis or denial for decision makers. Scenario planning is an emerging tool for climate change adaptation that provides a structured framework for identifying and exploring critical drivers of change and their uncertain outcomes. Since 2007, the National Park Service (NPS) has been working with its partners to develop and apply a scenario-based approach for adaptation planning that integrates quantitative, model-driven, climate change projections with qualitative, participatory exercises to explore management and policy options under a range of future conditions. Major outcomes of this work are (1) increased understanding of key scientific results and uncertainties, (2) incorporation of alternative perspectives into park and landscape level planning, (3) identification of "no brainer" and "no gainer" actions, (4) strengthening of regional science-management partnerships, and (5) overall improved capacity for flexible decision making. The basic approach employed by NPS for scenario planning follows a typical adaptive management process: define the focal question, assess the relevant science, explore plausible futures, identify effective strategies, prioritize and implement actions, and monitor results. Many science and management partners contributed to the process, including NOAA Regional Integrated Science and Assessment teams (RISAs) and Regional Climate Centers (RCCs), USGS Research Centers, and other university and government scientists. The Global Business Network, an internationally recognized leader in scenario development, provided expert facilitation and training techniques. Climate science input is provided through global and regional circulation models and downscaling to arrive at climate driver information that is relevant for parks and the landscapes within which they are found. Considerable effort is necessary to synthesize the information and to effectively communicate uncertainties about both values and trend (e.g. scientists have higher confidence in the trend of temperature over a given time period than the value). Drivers that are determined to be highly consequential and uncertain are used to create management-relevant scenarios using various techniques, including a structured 2X2 matrix approach, a succession of rapid combinations using multiple variables, and the development of a base, "least change" scenario from which alternatives are then constructed. Socio-economic factors are also considered as essential factors that define the full decision environment within which management and policy decisions are made. Resulting scenarios incorporate information about impacts to natural and cultural resources as well as facilities and visitor experience. The NPS conducted prototypes for scenario planning in each of seven regions and has begun to incorporate elements of the process into all planning requirements. A significant outcome of this work is managers and scientists alike understand climate and ecosystem models provide tools for exploring the future rather than predicting it.

  5. Pattern-based information portal for business plan co-creation

    NASA Astrophysics Data System (ADS)

    Bontchev, Boyan; Ruskov, Petko; Tanev, Stoyan

    2011-03-01

    Creation of business plans helps entrepreneurs in managing identification of business opportunities and committing necessary resources for process evolution. Applying patterns in business plan creation facilitates the identification of effective solutions that were adopted in the past and may provide a basis for adopting similar solutions in the future within given business context. The article presents the system design of an information portal for business plan co-creation based on patterns. The portal is going to provide start-up and entrepreneurs with ready-to-modify business plan patterns in order to help them in development of effective and efficient business plans. It will facilitate entrepreneurs in co-experimenting and co-learning more frequently and faster. Moreover, the paper focuses on the software architecture of the pattern based portal and explains the functionality of its modules, namely the pattern designer, pattern repository services and agent-based pattern implementers. It explains their role for business process co-creation, storing and managing patterns described formally, and selecting patterns best suited for specific business case. Thus, innovative entrepreneurs will be guided by the portal in co-writing winning business plans and staying competitive in the present day dynamic globalized environment.

  6. Pattern-based information portal for business plan co-creation

    NASA Astrophysics Data System (ADS)

    Bontchev, Boyan; Ruskov, Petko; Tanev, Stoyan

    2010-10-01

    Creation of business plans helps entrepreneurs in managing identification of business opportunities and committing necessary resources for process evolution. Applying patterns in business plan creation facilitates the identification of effective solutions that were adopted in the past and may provide a basis for adopting similar solutions in the future within given business context. The article presents the system design of an information portal for business plan co-creation based on patterns. The portal is going to provide start-up and entrepreneurs with ready-to-modify business plan patterns in order to help them in development of effective and efficient business plans. It will facilitate entrepreneurs in co-experimenting and co-learning more frequently and faster. Moreover, the paper focuses on the software architecture of the pattern based portal and explains the functionality of its modules, namely the pattern designer, pattern repository services and agent-based pattern implementers. It explains their role for business process co-creation, storing and managing patterns described formally, and selecting patterns best suited for specific business case. Thus, innovative entrepreneurs will be guided by the portal in co-writing winning business plans and staying competitive in the present day dynamic globalized environment.

  7. Veterans' Pain Management Goals: Changes During the Course of a Peer-led Pain Self-Management Program

    PubMed Central

    Bauer, Sarah M.; McGuire, Alan B.; Kukla, Marina; McGuire, Shannon; Bair, Matthew J.; Matthias, Marianne S.

    2017-01-01

    Objective Goal setting is a common element of self-management support programs; however, little is known about the nature of patients' goals or how goals change during pain self-management. The purpose of the current study is to explore how patients' goals and views of goal setting change over the course of a peer-led pain self-management program. Methods Veterans (n = 16) completing a 4-month peer-led pain self-management program completed semi-structured interviews at baseline and follow-up regarding their goals for their pain. Interviews were analyzed using immersion/crystallization. Results Analyses revealed six themes: motivation to do something for their pain, more goal-oriented, actually setting goals, clarity of goal importance, more specific/measurable goal criteria, and more specific/measurable strategies. Conclusion The current analyses illustrate how participants' goals can evolve over the course of a peer-led pain self-management program. Specifically, increased motivation, more openness to using goals, greater clarity of goal importance, more specific and measurable goals and strategies, and the influence of the peer coach relationship were described by participants. Practice implications Pain self-management interventions should emphasize goal setting, and development of specific, measurable goals and plans. Trainings for providers should address the potential for the provider-patient relationship, particularly peer providers, to facilitate motivation and goal setting. PMID:27516437

  8. Veterans' pain management goals: Changes during the course of a peer-led pain self-management program.

    PubMed

    Bauer, Sarah M; McGuire, Alan B; Kukla, Marina; McGuire, Shannon; Bair, Matthew J; Matthias, Marianne S

    2016-12-01

    Goal setting is a common element of self-management support programs; however, little is known about the nature of patients' goals or how goals change during pain self-management. The purpose of the current study is to explore how patients' goals and views of goal setting change over the course of a peer-led pain self-management program. Veterans (n=16) completing a 4-month peer-led pain self-management program completed semi-structured interviews at baseline and follow-up regarding their goals for their pain. Interviews were analyzed using immersion/crystallization. Analyses revealed six themes: motivation to do something for their pain, more goal-oriented, actually setting goals, clarity of goal importance, more specific/measurable goal criteria, and more specific/measurable strategies. The current analyses illustrate how participants' goals can evolve over the course of a peer-led pain self-management program. Specifically, increased motivation, more openness to using goals, greater clarity of goal importance, more specific and measurable goals and strategies, and the influence of the peer coach relationship were described by participants. Pain self-management interventions should emphasize goal setting, and development of specific, measurable goals and plans. Trainings for providers should address the potential for the provider-patient relationship, particularly peer providers, to facilitate motivation and goal setting. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  9. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists tomore » assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.« less

  10. Mobile, Collaborative Situated Knowledge Creation for Urban Planning

    PubMed Central

    Zurita, Gustavo; Baloian, Nelson

    2012-01-01

    Geo-collaboration is an emerging research area in computer sciences studying the way spatial, geographically referenced information and communication technologies can support collaborative activities. Scenarios in which information associated to its physical location are of paramount importance are often referred as Situated Knowledge Creation scenarios. To date there are few computer systems supporting knowledge creation that explicitly incorporate physical context as part of the knowledge being managed in mobile face-to-face scenarios. This work presents a collaborative software application supporting visually-geo-referenced knowledge creation in mobile working scenarios while the users are interacting face-to-face. The system allows to manage data information associated to specific physical locations for knowledge creation processes in the field, such as urban planning, identifying specific physical locations, territorial management, etc.; using Tablet-PCs and GPS in order to geo-reference data and information. It presents a model for developing mobile applications supporting situated knowledge creation in the field, introducing the requirements for such an application and the functionalities it should have in order to fulfill them. The paper also presents the results of utility and usability evaluations. PMID:22778639

  11. Mobile, collaborative situated knowledge creation for urban planning.

    PubMed

    Zurita, Gustavo; Baloian, Nelson

    2012-01-01

    Geo-collaboration is an emerging research area in computer sciences studying the way spatial, geographically referenced information and communication technologies can support collaborative activities. Scenarios in which information associated to its physical location are of paramount importance are often referred as Situated Knowledge Creation scenarios. To date there are few computer systems supporting knowledge creation that explicitly incorporate physical context as part of the knowledge being managed in mobile face-to-face scenarios. This work presents a collaborative software application supporting visually-geo-referenced knowledge creation in mobile working scenarios while the users are interacting face-to-face. The system allows to manage data information associated to specific physical locations for knowledge creation processes in the field, such as urban planning, identifying specific physical locations, territorial management, etc.; using Tablet-PCs and GPS in order to geo-reference data and information. It presents a model for developing mobile applications supporting situated knowledge creation in the field, introducing the requirements for such an application and the functionalities it should have in order to fulfill them. The paper also presents the results of utility and usability evaluations.

  12. [Management of human resources, materials, and organization processes in radioprotection].

    PubMed

    Coppola, V

    1999-06-01

    The radiologist must learn to face daily management responsibilities and therefore he/she needs the relevant knowledge. Aside from the mechanisms of management accounting, which differ only slightly from similar analysis methods used in other centers, the managing radiologist (the person in charge) is directly responsible for planning, organizing, coordinating and controlling radiation protection, a major discipline characterizing diagnostic imaging. We will provide some practical management hints, keeping in mind that radiation protection must not be considered a simple (or annoying) technical task, but rather an extraordinary positive element for the radiologist's cultural differentiation and professional identity. The managing radiologist can use the theory and practice of management techniques successfully applied in business, customizing them to the ethics and economics of health care. Meeting the users' needs must obviously prevail on balancing the budget from both a logical and an accounting viewpoints, since non-profit organizations are involved. In radiological practice, distinguishing the management of human from structural resources (direct funding is not presently available) permits to use internal benchmarking for the former and controlled acquisition and planned replacement of technologies in the latter, obviously after evaluation of specific indicators and according to the relevant laws and technical guidelines. Managing human resources means safeguarding the patient, the operator and the population, which can be achieved or improved using benchmarking in a diagnostic imaging department. The references for best practice will be set per tabulas based on the relevant laws and (inter)national guidelines. The physical-technical and bureaucratic-administrative factors involved will be considered as process indices to evaluate the gap from normal standards. Among the different elements involved in managing structural resources, the appropriate acquisition of a piece of radiological equipment is important from both a radiation protection and an economic viewpoints. In the acquisition process, the first and the last steps (technology assessment and planned replacement, respectively) are specifically important for the radiologist and play a major role in global management. In both cases the radiologist must be able to lay out autonomous and objective working projects, also using evaluation algorithms.

  13. Development of policies for Natura 2000 sites: a multi-criteria approach to support decision makers.

    PubMed

    Cortina, Carla; Boggia, Antonio

    2014-08-01

    The aim of this study is to present a methodology to support decision makers in the choice of Natura 2000 sites needing an appropriate management plan to ensure a sustainable socio-economic development. In order to promote sustainable development in the Natura 2000 sites compatible with nature preservation, conservation measures or management plans are necessary. The main issue is to decide when only conservation measures can be applied and when the sites need an appropriate management plan. We present a case study for the Italian Region of Umbria. The methodology is based on a multi-criteria approach to identify the biodiversity index (BI), and on the development of a human activities index (HAI). By crossing the two indexes for each site on a Cartesian plane, four groups of sites were identified. Each group corresponds to a specific need for an appropriate management plan. Sites in the first group with a high level both of biodiversity and human activities have the most urgent need of an appropriate management plan to ensure sustainable development. The proposed methodology and analysis is replicable in other regions or countries by using the data available for each site in the Natura 2000 standard data form. A multi-criteria analysis is especially suitable for supporting decision makers when they deal with a multidimensional decision process. We found the multi-criteria approach particularly sound in this case, due to the concept of biodiversity itself, which is complex and multidimensional, and to the high number of alternatives (Natura 2000 sites) to be assessed. Copyright © 2014 Elsevier Ltd. All rights reserved.

  14. 222-S Laboratory Quality Assurance Plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meznarich, H.K.

    1995-07-31

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A qualitymore » assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document.« less

  15. Temporomandibular disorders. Part 2: conservative management

    PubMed Central

    Shaffer, Stephen M; Brismée, Jean-Michel; Sizer, Phillip S; Courtney, Carol A

    2014-01-01

    Appropriate management of temporomandibular disorders (TMD) requires an understanding of the underlying dysfunction associated with the temporomandibular joint (TMJ) and surrounding structures. A comprehensive examination process, as described in part 1 of this series, can reveal underlying clinical findings that assist in the delivery of comprehensive physical therapy services for patients with TMD. Part 2 of this series focuses on management strategies for TMD. Physical therapy is the preferred conservative management approach for TMD. Physical therapists are professionally well-positioned to step into the void and provide clinical services for patients with TMD. Clinicians should utilize examination findings to design rehabilitation programs that focus on addressing patient-specific impairments. Potentially appropriate plan of care components include joint and soft tissue mobilization, trigger point dry needling, friction massage, therapeutic exercise, patient education, modalities, and outside referral. Management options should address both symptom reduction and oral function. Satisfactory results can often be achieved when management focuses on patient-specific clinical variables. PMID:24976744

  16. Environmental audit: III. Improving the management of environmental information for toxic substances

    NASA Astrophysics Data System (ADS)

    Sokolik, Stanley L.; Schaeffer, David J.

    1986-05-01

    Environmental programs have been commonly driven by a preoccupation with the collection of data in the mistaken belief that data is synonymous with information. The distinction between data (that is, the quantified and qualitative attributes of a particular environment) and information (specifically, data processed so as to focus upon a particular environmental problem) will become far more important to environmental managers. They will increasingly manage their information through use of what has become known as information resource management (IRM) and the attendant use of critical success factors methodology. Environmental managers will thereby move away from concerns about data and specific EDP hardware and applications toward managing information as a valuable agency resource. In applying IRM, they will find it helpful to include a number of planning elements and to resolve early a number of issues critical to its successful use.

  17. Trial of a "credit card" asthma self-management plan in a high-risk group of patients with asthma.

    PubMed

    D'Souza, W; Burgess, C; Ayson, M; Crane, J; Pearce, N; Beasley, R

    1996-05-01

    The "credit card" asthma self-management plan provides the adult asthmatic patient with simple guidelines for the self-management of asthma, which are based on the self-assessment of peak expiratory flow rate recordings and symptoms. The study was a trial of the clinical efficacy of the credit card plan in a high-risk group of asthmatic patients. In this "before-and-after" trial, patients discharged from the emergency department of Wellington Hospital, after treatment for severe asthma were invited to attend a series of hospital outpatient clinics at which the credit card plan was introduced. Questionnaires were used to compare markers of asthma morbidity, requirement for emergency medical care, and medication use during the 6-month period before and after intervention with the credit card plan. Of the 30 patients with asthma who attended the first outpatient clinic, 26 (17 women and 9 men) completed the program. In these 26 participants, there was a reduction in both morbidity and requirement for acute medical services: specifically, the proportion waking with asthma more than once a week decreased from 65% to 23% (p = 0.005) and the proportion visiting the emergency department for treatment of severe asthma decreased from 58% to 15% (p = 0.004). The patients attending the clinics commented favorably on the plan, in particular on its usefulness as an educational tool for monitoring and treating their asthma. Although the interpretation of this study is limited by the lack of a randomized control group, the findings are consistent with other evidence that the credit card asthma self-management plan can be an effective and acceptable system for improving asthma care in a high-risk group of adult patients with asthma.

  18. Development and evaluation of an aged care specific Advance Care Plan.

    PubMed

    Silvester, William; Parslow, Ruth A; Lewis, Virginia J; Fullam, Rachael S; Sjanta, Rebekah; Jackson, Lynne; White, Vanessa; Hudson, Rosalie

    2013-06-01

    To report on the quality of advance care planning (ACP) documents in use in residential aged care facilities (RACF) in areas of Victoria Australia prior to a systematic intervention; to report on the development and performance of an aged care specific Advance Care Plan template used during the intervention. An audit of the quality of pre-existing documentation used to record resident treatment preferences and end-of-life wishes at participating RACFs; development and pilot of an aged care specific Advance Care Plan template; an audit of the completeness and quality of Advance Care Plans completed on the new template during a systematic ACP intervention. 19 selected RACFs (managed by 12 aged care organisations) in metropolitan and regional areas of Victoria. Documentation in use at facilities prior to the ACP intervention most commonly recorded preferences regarding hospital transfer, life prolonging treatment and personal/cultural/religious wishes. However, 7 of 12 document sets failed to adequately and clearly specify the resident's preferences as regards life prolonging medical treatment. The newly developed aged care specific Advance Care Plan template was met with approval by participating RACFs. Of 203 Advance Care Plans completed on the template throughout the project period, 49% included the appointment of a Medical Enduring Power of Attorney. Requests concerning medical treatment were specified in almost all completed documents (97%), with 73% nominating the option of refusal of life-prolonging treatment. Over 90% of plans included information concerning residents' values and beliefs, and future health situations that the resident would find to be unacceptable were specified in 78% of completed plans. Standardised procedures and documentation are needed to improve the quality of processes, documents and outcomes of ACP in the residential aged care sector.

  19. Adherence to Metformin, Statins, and ACE/ARBs Within the Diabetes Health Plan (DHP).

    PubMed

    Duru, O Kenrik; Turk, Norman; Ettner, Susan L; Neugebauer, Romain; Moin, Tannaz; Li, Jinnan; Kimbro, Lindsay; Chan, Charles; Luchs, Robert H; Keckhafer, Abigail M; Kirvan, Anya; Ho, Sam; Mangione, Carol M

    2015-11-01

    Reducing patient cost-sharing and engaging patients in disease management activities have been shown to increase uptake of evidence-based care. To evaluate the effect of employer purchase of a disease-specific plan with reduced cost-sharing and disease management (the Diabetes Health Plan/DHP) on medication adherence among eligible employees and dependents. Employer-level "intent to treat" cohort study, including data from eligible employees and their dependents with diabetes, regardless of whether they were enrolled in the DHP. Employers that contracted with a large national health plan administrator in 2009, 2010, and/or 2011. Ten employers that purchased the DHP and 191 employers that did not (controls). Inverse probability weighting (IPW) estimation was used to adjust for inter-group differences. The DHP includes free or low-cost medications and physician visits. Enrollment strategies and specific benefit designs are determined by the employer and vary in practice. DHP participants are notified up front that they must engage in their own health care (e.g., receiving diabetes-related screening) in order to remain enrolled. Mean employee adherence to metformin, statins, and ACE/ARBs at the employer level at one year post-DHP implementation, as measured by the proportion of days covered (PDC). Baseline adherence to the three medications was similar across DHP and control employers, ranging from 64 to 69 %. In the first year after DHP implementation, predicted employer-level adherence for metformin (+4.9 percentage points, p = 0.017), statins (+4.8, p = 0.019), and ACE/ARBs (+4.4, p = 0.02) was higher with DHP purchase. Non-randomized, observational study. The Diabetes Health Plan, an innovative health plan that combines reduced cost-sharing and disease management with an up-front requirement of enrollee participation in his or her own health care, is associated with a modest improvement in medication adherence at 12 months.

  20. Gold and Silver Health Plans: Accommodating Demand Heterogeneity in Managed Competition

    PubMed Central

    Glazer, Jacob; McGuire, Thomas G.

    2011-01-01

    New regulation of health insurance markets creates multiple levels of health plans, with designations like “Gold” and “Silver”. The underlying rationale for the heavy-metal approach to insurance regulation is that heterogeneity in demand for health care is not only due to health status (sick demand more than the healthy) but also to other, “taste” related factors (rich demand more than the poor). This paper models managed competition with demand heterogeneity to consider plan payment and enrollee premium policies in relation to efficiency (net consumer benefit) and fairness (the European concept of “solidarity”). Specifically, this paper studies how to implement a “Silver” and “Gold” health plan efficiently and fairly in a managed competition context. We show that there are sharp tradeoffs between efficiency and fairness. When health plans cannot or may not (because of regulation) base premiums on any factors affecting demand, enrollees do not choose the efficient plan. When taste (e.g. income) can be used as a basis of payment, a simple tax can achieve both efficiency and fairness. When only health status (and not taste) can be used as a basis of payment, health status-based taxes and subsidies are required and efficiency can only be achieved with a modified version of fairness we refer to as “weak solidarity.” An overriding conclusion is that the regulation of premiums for both the basic and the higher level plans is necessary for efficiency. PMID:21767887

  1. A Practical Procedure for Instituting a Chore and Allowance Program for Grade School Children: Specific Guidelines for Clinicians.

    ERIC Educational Resources Information Center

    Neul, Shari K. T.; Drabman, Ronald S.

    2001-01-01

    This article provides a use plan for instituting and maintaining a successful chore and allowance program for children. Specific guidelines are outlined regarding how to teach children basic money management skills. Explicit examples are offered for teaching these skills that can be easily adopted by parents and clinicians who specialize in…

  2. Forest-Site Planning and Prescription for Control of Annosus Root Disease in Ponderosa Pine and Mixed Conifer Stands

    Treesearch

    John Nesbitt

    1989-01-01

    In order to successfully combat pathogens such as annosus root rot, the land manager and pathologist must have periodic dialogue about the pest, its identification, effects, impacts, and cures. The author presents four important topics to structure this dialogue. These are (1) training from the pathologist to the silviculturist or other land manager, (2) site specific...

  3. Specification of Training Simulator Fidelity: A Research Plan

    DTIC Science & Technology

    1982-02-01

    Knowlede --Dunnette (1976) has recently reviewed the literature in the areas of human skills, abilities, and knowledges. The establishment of what types... management 6. Other than rational user responses to R&D studies and to training simulators 7. Deficiencies in training simulator design 23...proficient at managing the introduction of training innovations by applying those factors that can be controlled to influence acceptance. (p. 19) The

  4. Pedestrian Levels of Service (LOS) at Muir Woods National Monument (California): An introduction to multi-modal LOS for parks and protected areas

    Treesearch

    Peter R. Pettengill; Robert E. Manning; William Valliere; Laura E. Anderson

    2010-01-01

    Historically, transportation planning and management have been guided largely by principles of efficiency. Specifically, the Transportation Research Board has utilized a levels of service (LOS) framework to assess quality of service in terms of traffic congestion, speed and travel time, and maximum road capacity. In the field of park and outdoor recreation management,...

  5. Assessment of Navy Contract Management Processes

    DTIC Science & Technology

    2016-04-30

    Defense (DoD) and defense contractor organizational contract management process capability. The CMMM has been previously applied at Air Force, Army...Navy, and defense contractor organizations. Specific to the Navy, assessments were conducted at three Navy contracting centers using the CMMM. These...agency’s poor contract planning, contract administration, and contractor oversight (DoDIG, 2009, 2012, 2013, 2014). The DoD’s response to the GAO’s high

  6. Scalable collaborative risk management technology for complex critical systems

    NASA Technical Reports Server (NTRS)

    Campbell, Scott; Torgerson, Leigh; Burleigh, Scott; Feather, Martin S.; Kiper, James D.

    2004-01-01

    We describe here our project and plans to develop methods, software tools, and infrastructure tools to address challenges relating to geographically distributed software development. Specifically, this work is creating an infrastructure that supports applications working over distributed geographical and organizational domains and is using this infrastructure to develop a tool that supports project development using risk management and analysis techniques where the participants are not collocated.

  7. Implementing the 2012 North American Waterfowl Management Plan revision: Populations, habitat, and people

    USGS Publications Warehouse

    Humburg, Dale D.; Anderson, Michael G.; Brasher, Michael G.; Carter, Michael F.; Eadie, John M.; Fulton, David C.; Johnson, Fred A.; Runge, Michael C.; Vrtiska, Mark P.

    2018-01-01

    The North American Waterfowl Management Plan (NAWMP) has established a model for wildlife conservation planning over the last 3 decades. Management at a continental scale, leveraged funding, regional partnerships, and a strong science basis have been notable features. Periodic updates to the NAWMP occurred since implementation in 1986; however, a fundamental revision was accomplished in 2012 after extensive stakeholder engagement. An explicit fundamental goal for waterfowl conservation supporters was added in 2012, complementing existing goals for sustainable populations and sufficient habitat found in previous updates. We present a synopsis of progress toward implementation of the 2012 NAWMP and challenge the waterfowl management community to continue with meaningful steps toward achieving NAWMP goals. Adding goals and objectives for supporters increases potential relevance of NAWMP; however, it also presents a level of complexity that was not entirely anticipated. Additionally, the 2012 NAWMP recognized that traditional support from waterfowl hunters alone will not be sufficient to support waterfowl conservation in the future. Simultaneous consideration of multiple objectives, although implicit before, now is a specific focus for habitat and harvest management affecting hunters and other users of the waterfowl resource. The waterfowl management community is faced with revisiting objectives and management actions related to harvest regulations, landscape priorities, habitat conservation, and public engagement to garner broader support. These persistent management challenges are tangible and relevant candidates for greater integration. Ultimately, the structures and processes supporting waterfowl management also will need to be reconsidered.

  8. Using Science Skills to Understand Ecophysiology and Manage Resources

    NASA Technical Reports Server (NTRS)

    Bubenheim, David

    2015-01-01

    Presentation will be for a general audience and focus on plant science and ecosystem science in NASA. Examples from the projects involving the presenter will be used to illustrate. Specifically, the California Sacramento-San Joaquin River Delta project. This collaboration supports the goals of the Delta Plan in developing science-based, adaptive-management strategies. The mission is to improve reliability of water supply and restore a healthy Delta ecosystem while enhancing agriculture and recreation. NASA can contribute gap-filling science understanding of overall functions in the Delta ecosystem and assess and help develop management plans for specific issues. Airborne and satellite remote-sensing, ecosystem modeling, and biological studies provide underlying data needed by Delta stakeholders to assess and address water, ecosystem restoration, and environmental and economic impacts of potential actions in the Delta. The California Sacramento-San Joaquin River Delta, the hub for California's water supply, supports important ecosystem services for fisheries, supplies drinking water for millions, and distributes water from Northern California to agriculture and urban communities to the south; millions of people and businesses depend on Delta water. Decades of competing demands for Delta resources and year-to-year variability in precipitation has resulted in diminished overall health of the Delta. Declines in fish populations, threatened ecosystems, endangered species, invasive plants and animals, cuts in agricultural exports, and increased water conservation is the result. NASA and the USDA, building on previous collaborations, aide local Delta stakeholders in assessing and developing an invasive weed management approach. Aquatic, terrestrial, and riparian invasive weeds threaten aquatic and terrestrial ecosystem restoration efforts. Aquatic weeds are currently detrimental economically, environmentally, and sociologically in the Delta. They negatively impact the redistribution of water and disrupt the ecology of the Bay Delta food web. Filling current science gaps in the Delta Plan and improving management practices within the Delta are important to achieving the mission of improved Delta health. Methods developed can become routine land and water management tools. New high-resolution NASA sensor systems could be used to provide data packages specifically designed for water system The presenter will also speak about his personal experience and the role Delaware Valley College played in preparation for a professional career science.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies themore » close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.« less

  10. The Oklahoma bombing. Lessons learned.

    PubMed

    Anteau, C M; Williams, L A

    1997-06-01

    The Oklahoma City bombing experience in April of 1995 provided a unique opportunity to test the effectiveness of an existing disaster plan. The critical care nurses at Columbia Presbyterian Hospital learned valuable lessons about managing intense activity, equipment and supplies, staffing resources, and visitor issues. The degree to which the bombing affected the emotional state of personnel was unanticipated, and leaders learned that critical stress management interventions should be included in every emergency preparedness plan. Additionally, recommendations include using runners for communication; assigning specific roles (supplies, staffing, triage); keeping additional staff in reserve for shift relief; ensuring ample hospital staff members are available to coordinate visitors and media; and setting up record systems to preserve continuity. The unique lessons learned as a result of this terrorist attack can be used by other critical care nurses to understand and refine disaster plans.

  11. Strategies for flood hazard adaptation in drought affected regions of Afghanistan

    NASA Astrophysics Data System (ADS)

    Schleupner, Christine

    2010-05-01

    The development and management of water resources in Afghanistan are critically important for the economic development of the country. But Afghanistan presents a number of specific challenges in terms of water resource management and climate change impact assessment. Political instability and war has caused widespread devastation, insecurity, displacement, poverty and severe environmental degradation. Recent droughts have led to the collapse of many livelihoods, and poor national security restricts structured fieldwork. The recent restructuring and rebuilding of the state can be seen as opportunity to integrate climate change mitigation and adaptation measures into national, regional, and local planning. Governmental organizations are responsible to integrate climate change related issues and pro-active planning processes in water management and environmental considerations into relevant legislations, ministry and sector strategies. Integrated water resource management has been practically nonexistent during the last decades and consideration of climate change impacts are widely ignored in regional planning processes. However, flooding, landslides, drought, and extreme heat and freezing weather are already threatening the population. Climate models suggest that Afghanistan will be confronted by an increase of these events. Desertification and land degradation but also floods due to untimely rainfall are expected to broaden. Studies show that the impact of increasingly frequent flash floods may be amplified due to more rapid spring snow melt as a result of higher temperatures, combined with the downstream effects of land degradation, loss of vegetative cover and land mismanagement. It is further exacerbated by drought, which has the effect of hardening soils and reducing their permeability. In 2007 heavy floods already destroyed fields and harvests, killed livestock, damaged buildings, and claimed many lives. The intensified climatic conditions in Afghanistan will continue to impact upon society by creating stresses for specific vulnerable groups. This study discusses and compares existing policies, legislations and strategies considering flood adaptation planning in Afghanistan. It reviews available Flood Hazard Maps and reflects on regional adaptation options. Present and future vulnerability to flooding is assessed through a GIS-based model by using scenario techniques. A strategy is developed how to implement measures into regional and integrated water resource management planning. In general, not a single but the selection of multiple measures will be successful in pro-active planning for climate change adaptation. In this regard a continuous consultation with stakeholders needs to take place to address their demands. Thus the results of this study cannot give solutions but might build the basis for recommended active planning processes.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bower, J.C.; Burford, M.J.; Downing, T.R.

    The Integrated Baseline System (IBS) is an emergency management planning and analysis tool that is being developed under the direction of the US Army Nuclear and Chemical Agency (USANCA). The IBS Data Management Guide provides the background, as well as the operations and procedures needed to generate and maintain a site-specific map database. Data and system managers use this guide to manage the data files and database that support the administrative, user-environment, database management, and operational capabilities of the IBS. This document provides a description of the data files and structures necessary for running the IBS software and using themore » site map database.« less

  13. Water resources management. World Bank policy paper; Gestion des ressources en eau

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1993-12-31

    The management framework presented in this study addresses the demand for water in Asia caused by rapid population growth and economic development. It focuses on three key actions to meet the challenge: evaluate how the region manages water resources; identify guidelines for the Bank`s water resource programs; and develop country-specific strategies and promote joint programs. Reforms built into the framework seek to modernize institutions that affect water sources. The authors suggest ways to improve planning and long-term management, streamline economic and financial policy, and upgrade `real-time` management, operation, and maintenance.

  14. Wildlife connectivity approaches and best practices in U.S. state wildlife action plans.

    PubMed

    Lacher, Iara; Wilkerson, Marit L

    2014-02-01

    As habitat loss and fragmentation threaten biodiversity on large geographic scales, creating and maintaining connectivity of wildlife populations is an increasingly common conservation objective. To assess the progress and success of large-scale connectivity planning, conservation researchers need a set of plans that cover large geographic areas and can be analyzed as a single data set. The state wildlife action plans (SWAPs) fulfill these requirements. We examined 50 SWAPs to determine the extent to which wildlife connectivity planning, via linkages, is emphasized nationally. We defined linkage as connective land that enables wildlife movement. For our content analysis, we identified and quantified 6 keywords and 7 content criteria that ranged in specificity and were related to linkages for wide-ranging terrestrial vertebrates and examined relations between content criteria and statewide data on focal wide-ranging species, spending, revenue, and conserved land. Our results reflect nationwide disparities in linkage conservation priorities and highlight the continued need for wildlife linkage planning. Only 30% or less of the 50 SWAPs fulfilled highly specific content criteria (e.g., identifying geographic areas for linkage placement or management). We found positive correlations between our content criteria and statewide data on percent conserved land, total focal species, and spending on parks and recreation. We supplemented our content analysis with interviews with 17 conservation professionals to gain specific information about state-specific context and future directions of linkage conservation. Based on our results, relevant literature, and interview responses, we suggest the following best practices for wildlife linkage conservation plans: collect ecologically meaningful background data; be specific; establish community-wide partnerships; and incorporate sociopolitical and socioeconomic information. © 2013 Society for Conservation Biology.

  15. Wildlife connectivity approaches and best practices in U.S. state wildlife action plans

    USGS Publications Warehouse

    Lacher, Iara; Wilkerson, Marit L.

    2014-01-01

    As habitat loss and fragmentation threaten biodiversity on large geographic scales, creating and maintaining connectivity of wildlife populations is an increasingly common conservation objective. To assess the progress and success of large-scale connectivity planning, conservation researchers need a set of plans that cover large geographic areas and can be analyzed as a single data set. The state wildlife action plans (SWAPs) fulfill these requirements. We examined 50 SWAPs to determine the extent to which wildlife connectivity planning, via linkages, is emphasized nationally. We defined linkage as connective land that enables wildlife movement. For our content analysis, we identified and quantified 6 keywords and 7 content criteria that ranged in specificity and were related to linkages for wide-ranging terrestrial vertebrates and examined relations between content criteria and statewide data on focal wide-ranging species, spending, revenue, and conserved land. Our results reflect nationwide disparities in linkage conservation priorities and highlight the continued need for wildlife linkage planning. Only 30% or less of the 50 SWAPs fulfilled highly specific content criteria (e.g., identifying geographic areas for linkage placement or management). We found positive correlations between our content criteria and statewide data on percent conserved land, total focal species, and spending on parks and recreation. We supplemented our content analysis with interviews with 17 conservation professionals to gain specific information about state-specific context and future directions of linkage conservation. Based on our results, relevant literature, and interview responses, we suggest the following best practices for wildlife linkage conservation plans: collect ecologically meaningful background data; be specific; establish community-wide partnerships; and incorporate sociopolitical and socioeconomic information.

  16. Cooperative drought adaptation: Integrating infrastructure development, conservation, and water transfers into adaptive policy pathways

    NASA Astrophysics Data System (ADS)

    Zeff, Harrison B.; Herman, Jonathan D.; Reed, Patrick M.; Characklis, Gregory W.

    2016-09-01

    A considerable fraction of urban water supply capacity serves primarily as a hedge against drought. Water utilities can reduce their dependence on firm capacity and forestall the development of new supplies using short-term drought management actions, such as conservation and transfers. Nevertheless, new supplies will often be needed, especially as demands rise due to population growth and economic development. Planning decisions regarding when and how to integrate new supply projects are fundamentally shaped by the way in which short-term adaptive drought management strategies are employed. To date, the challenges posed by long-term infrastructure sequencing and adaptive short-term drought management are treated independently, neglecting important feedbacks between planning and management actions. This work contributes a risk-based framework that uses continuously updating risk-of-failure (ROF) triggers to capture the feedbacks between short-term drought management actions (e.g., conservation and water transfers) and the selection and sequencing of a set of regional supply infrastructure options over the long term. Probabilistic regional water supply pathways are discovered for four water utilities in the "Research Triangle" region of North Carolina. Furthermore, this study distinguishes the status-quo planning path of independent action (encompassing utility-specific conservation and new supply infrastructure only) from two cooperative formulations: "weak" cooperation, which combines utility-specific conservation and infrastructure development with regional transfers, and "strong" cooperation, which also includes jointly developed regional infrastructure to support transfers. Results suggest that strong cooperation aids utilities in meeting their individual objectives at substantially lower costs and with less overall development. These benefits demonstrate how an adaptive, rule-based decision framework can coordinate integrated solutions that would not be identified using more traditional optimization methods.

  17. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  18. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  19. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  20. 43 CFR 1610.4 - Resource management planning process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Resource management planning process. 1610... LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR GENERAL MANAGEMENT (1000) PLANNING, PROGRAMMING, BUDGETING Resource Management Planning § 1610.4 Resource management planning process. ...

  1. Waste flow analysis and life cycle assessment of integrated waste management systems as planning tools: Application to optimise the system of the City of Bologna.

    PubMed

    Tunesi, Simonetta; Baroni, Sergio; Boarini, Sandro

    2016-09-01

    The results of this case study are used to argue that waste management planning should follow a detailed process, adequately confronting the complexity of the waste management problems and the specificity of each urban area and of regional/national situations. To support the development or completion of integrated waste management systems, this article proposes a planning method based on: (1) the detailed analysis of waste flows and (2) the application of a life cycle assessment to compare alternative scenarios and optimise solutions. The evolution of the City of Bologna waste management system is used to show how this approach can be applied to assess which elements improve environmental performance. The assessment of the contribution of each waste management phase in the Bologna integrated waste management system has proven that the changes applied from 2013 to 2017 result in a significant improvement of the environmental performance mainly as a consequence of the optimised integration between materials and energy recovery: Global Warming Potential at 100 years (GWP100) diminishes from 21,949 to -11,169 t CO2-eq y(-1) and abiotic resources depletion from -403 to -520 t antimony-eq. y(-1) This study analyses at great detail the collection phase. Outcomes provide specific operational recommendations to policy makers, showing the: (a) relevance of the choice of the materials forming the bags for 'door to door' collection (for non-recycled low-density polyethylene bags 22 kg CO2-eq (tonne of waste)(-1)); (b) relatively low environmental impacts associated with underground tanks (3.9 kg CO2-eq (tonne of waste)(-1)); (c) relatively low impact of big street containers with respect to plastic bags (2.6 kg CO2-eq. (tonne of waste)(-1)). © The Author(s) 2016.

  2. Translating Atopic Dermatitis Management Guidelines Into Practice for Primary Care Providers.

    PubMed

    Eichenfield, Lawrence F; Boguniewicz, Mark; Simpson, Eric L; Russell, John J; Block, Julie K; Feldman, Steven R; Clark, Adele R; Tofte, Susan; Dunn, Jeffrey D; Paller, Amy S

    2015-09-01

    Atopic dermatitis affects a substantial number of children, many of whom seek initial treatment from their pediatrician or other primary care provider. Approximately two-thirds of these patients have mild disease and can be adequately managed at the primary care level. However, recent treatment guidelines are written primarily for use by specialists and lack certain elements that would make them more useful to primary care providers. This article evaluates these recent treatment guidelines in terms of evaluation criteria, treatment recommendations, usability, accessibility, and applicability to nonspecialists and integrates them with clinical evidence to present a streamlined severity-based treatment model for the management of a majority of atopic dermatitis cases. Because each patient's situation is unique, individualization of treatment plans is critical as is efficient communication and implementation of the plan with patients and caregivers. Specifically, practical suggestions for individualizing, optimizing, implementing, and communicating treatment plans such as choosing a moisturizer formulation, avoiding common triggers, educating patients/caregivers, providing written treatment plans, and scheduling physician follow-up are provided along with a discussion of available resources for patients/caregivers and providers. Copyright © 2015 by the American Academy of Pediatrics.

  3. [Public food service in Milan city and Hinterland: GMP application (Part 1)].

    PubMed

    Pontello, M; Dal Vecchio, A; Bertini, I; Valerio, E

    2005-01-01

    Food service establishments are recognized as a critical sector concerning foodborne diseases occurrence, that is associated to contributing factors such as the anticipated preparation of meals that are often highly handled, and long-time distributed. A survey has been planned to evaluate the application of HACCP plan, in order to select a statistically representative sample of food services (restaurant, pizza-shop, bar, ..) in two Milan area' Public Health Units (PHU). During the inspections a proper check-list has been filled up in order to give a conformity evaluation about the global situation and about three specific sections: hygiene of food-handlers, procedures control, temperatures management. The food services have been found satisfactory in 9/106 and 5/54 cases in Milan City and in hinterland, respectively; among the two areas, highly significant differences have been revealed about temperatures management (68% and 28% unsatisfactory, respectively). In Milan City restaurants provided with HACCP plan scores are significantly different from unprovided restaurants scores (global and the three sections' evaluation); in Milan hinterland differences between provided and unprovided HACCP plan restaurants regard temperature management scores only. Useful suggestions to improve the quality of surveillance activity come from complex and heterogeneous findings shown in this study.

  4. Architecture for Control of the K9 Rover

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Bualat, maria; Fair, Michael; Wright, Anne; Washington, Richard

    2006-01-01

    Software featuring a multilevel architecture is used to control the hardware on the K9 Rover, which is a mobile robot used in research on robots for scientific exploration and autonomous operation in general. The software consists of five types of modules: Device Drivers - These modules, at the lowest level of the architecture, directly control motors, cameras, data buses, and other hardware devices. Resource Managers - Each of these modules controls several device drivers. Resource managers can be commanded by either a remote operator or the pilot or conditional-executive modules described below. Behaviors and Data Processors - These modules perform computations for such functions as planning paths, avoiding obstacles, visual tracking, and stereoscopy. These modules can be commanded only by the pilot. Pilot - The pilot receives a possibly complex command from the remote operator or the conditional executive, then decomposes the command into (1) more-specific commands to the resource managers and (2) requests for information from the behaviors and data processors. Conditional Executive - This highest-level module interprets a command plan sent by the remote operator, determines whether resources required for execution of the plan are available, monitors execution, and, if necessary, selects an alternate branch of the plan.

  5. Using canonical correlation analysis to identify environmental attitude groups: considerations for national forest planning in the southwestern U.S.

    PubMed

    Prera, Alejandro J; Grimsrud, Kristine M; Thacher, Jennifer A; McCollum, Dan W; Berrens, Robert P

    2014-10-01

    As public land management agencies pursue region-specific resource management plans, with meaningful consideration of public attitudes and values, there is a need to characterize the complex mix of environmental attitudes in a diverse population. The contribution of this investigation is to make use of a unique household, mail/internet survey data set collected in 2007 in the Southwestern United States (Region 3 of the U.S. Forest Service). With over 5,800 survey responses to a set of 25 Public Land Value statements, canonical correlation analysis is able to identify 7 statistically distinct environmental attitudinal groups. We also examine the effect of expected changes in regional demographics on overall environmental attitudes, which may help guide in the development of socially acceptable long-term forest management policies. Results show significant support for conservationist management policies and passive environmental values, as well as a greater role for stakeholder groups in generating consensus for current and future forest management policies.

  6. Critique of Practical Archaeology: Underwater Cultural Heritage and Best Practices

    NASA Astrophysics Data System (ADS)

    Secci, Massimiliano; Spanu, Pier Giorgio

    2015-04-01

    The international development of the underwater archaeology and underwater cultural heritage (UCH) management disciplines has witnessed a progressive buildup of the disciplinary debate. From an initial methodological focus, still active and necessary, the two interconnected disciplines have moved toward topics and aspects external, but complementary, to the disciplines themselves which are tied together in mutual exchange. Legal, economic, social, cultural (stricto sensu), and psychological aspects all find their expression in strategies quintessential, especially, to the management of UCH. The discipline's socio-cultural wherewithal has been internationally recognized, analyzed, evaluated, and exploited in the planning of activities directed toward UCH management. In Italy, however, a lack of a coherent planning has emerged which does not take into account the various aspects composing a productive program for the management of UCH, both at the regional and national levels. Considering the issue in Italy, this contribution will offer an overview of the Sardinian perspective, offering some considerations toward envisaging an achievable, structured program for the management of underwater cultural resources within a specific regional panorama.

  7. Individual differences in temperament and behavioral management practices for nonhuman primates

    PubMed Central

    Coleman, Kristine

    2011-01-01

    Effective behavioral management plans are tailored to unique behavioral patterns of each individual species. However, even within a species behavioral needs of individuals can vary. Factors such as age, sex, and temperament can affect behavioral needs of individuals. While some of these factors, such as age and sex, are taken into account, other factors, such as an individual’s temperament, are rarely specifically provided for in behavioral management plans. However, temperament may affect how animals respond to socialization, positive reinforcement training and other forms of enrichment. This review will examine how individual differences in temperament might affect, or be affected by, behavioral management practices for captive primates. Measuring temperament may help us predict outcome of social introductions. It can also predict which animals may be difficult to train using traditional methods. Further, knowledge of temperament may be able to help identify individuals at risk for development of behavioral problems. Taken together, understanding individual differences in temperament of captive primates can help guide behavioral management decisions. PMID:22518067

  8. Water: Critical Infrastructure and Key Resources Sector-Specific Plan as Input to the National Infrastructure Protection Plan

    DTIC Science & Technology

    2007-05-01

    National Association of Clean Water Agencies Shelly Foston Meridian Institute Michael Gritzuk Pima County (AZ) Wastewater Management Department Genevieve...agencies to assist small and medium systems, and it has helped fund and develop a variety of Web casts and security trainings. Although drinking water...trainings, conference calls, Web casts , and other communica- tions; (2) provide administrative support; (3) provide technical support; and (4

  9. 75 FR 52546 - Bureau of Ocean Energy Management, Regulation and Enforcement Outer Continental Shelf (OCS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... sciences, and social sciences) to review the specific studies plans of the BOEM regional offices for Fiscal... process and U.S. Geological Survey science with respect to the Deepwater Horizon incident. Following these...

  10. On the Road to Reuse: Residential Demolition Bid Specification Development Tool Report & Factsheet - September 2013

    EPA Pesticide Factsheets

    The September 2013 EPA Region 5 report and factsheet provide tools to help with waste management plans, waste disposal, handling hazardous materials, and earthwork. The documents also suggest demolition modifications to improve environmental results.

  11. Japanese Competitiveness and Japanese Management.

    ERIC Educational Resources Information Center

    Minabe, Shigeo

    1986-01-01

    Analyzes and compares Japanese and American industrial policy and labor practices. Proposes that certain aspects of the Japanese system be adapted by American businesses for purpose of increasing international competitiveness. Proposes specific actions and plans for both the Japanese and American systems. (ML)

  12. Information for Consumers (Drugs)

    MedlinePlus

    ... Evaluation and Mitigation Strategies (REMS) REMS is a risk management plan required by FDA for certain prescription drugs, that uses tools beyond routine professional labeling to ensure that the benefits of the drug outweigh its risks. Index to Drug - Specific Information List of drugs ...

  13. Development of a competency framework for nurse managers in Ireland.

    PubMed

    McCarthy, Geraldine; Fitzpatrick, Joyce J

    2009-08-01

    This article describes the results of an Irish national study on the Competency Model for Nursing Management commissioned by the Office of Health Management. More than 300 nurse managers and 80 service stakeholders (other professionals, managers, and service colleagues) participated in the development of generic competencies for nurse managers and specific competencies for three levels of managers-director level, middle manager level, and front-line managers. Examples of behavioral indicators (both positive and negative) for each competency level also have been delineated. Future efforts are being directed toward evaluating the usefulness of the competency model for assessing readiness to manage among job applicants, implementation of continuing education programs for nurse managers, and overall career development and planning. Copyright 2009, SLACK Incorporated.

  14. A "client perspective" helps improve services.

    PubMed

    1998-01-01

    Egypt's Ministry of Health launched a campaign in 1992 to improve client satisfaction with family planning clinic services in the country. In the program, family planning clinic supervisors are being trained to use a checklist of 101 indicators to evaluate services, ranging from the availability of contraceptive commodities to the condition of facilities. Television messages and posters disseminated throughout communities instruct potential clients to look for gold stars on the doors of family planning clinics across the country, indicators of a clinic which meets quality service standards. This program is currently used by almost 4000 clinics nationwide. Family planning services worldwide have long focused upon increasing levels of contraceptive use. More recently, however, they are also focusing upon the quality of services provided. Frameworks for improving services tend to emphasize better ways to interact with clients, and often address how to approach specific management concerns, such as maintaining adequate contraceptive supplies. Client interaction, management concerns, and how quality makes a difference are discussed.

  15. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    NASA Technical Reports Server (NTRS)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  16. 36 CFR 219.2 - Levels of planning and responsible officials.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGRICULTURE PLANNING National Forest System Land Management Planning § 219.2 Levels of planning and... management plan. A land management plan provides a framework for integrated resource management and for... management policies, practices, and procedures that are in the Forest Service Directive System. (3) The...

  17. Science-based Forest Management in an Era of Climate Change

    NASA Astrophysics Data System (ADS)

    Swanston, C.; Janowiak, M.; Brandt, L.; Butler, P.; Handler, S.; Shannon, D.

    2014-12-01

    Recognizing the need to provide climate adaptation information, training, and tools to forest managers, the Forest Service joined with partners in 2009 to launch a comprehensive effort called the Climate Change Response Framework (www.forestadaptation.org). The Framework provides a structured approach to help managers integrate climate considerations into forest management plans and then implement adaptation actions on the ground. A planning tool, the Adaptation Workbook, is used in conjunction with vulnerability assessments and a diverse "menu" of adaptation approaches to generate site-specific adaptation actions that meet explicit management objectives. Additionally, a training course, designed around the Adaptation Workbook, leads management organizations through this process of designing on-the-ground adaptation tactics for their management projects. The Framework is now being actively pursued in 20 states in the Northwoods, Central Hardwoods, Central Appalachians, Mid-Atlantic, and New England. The Framework community includes over 100 science and management groups, dozens of whom have worked together to complete six ecoregional vulnerability assessments covering nearly 135 million acres. More than 75 forest and urban forest adaptation strategies and approaches were synthesized from peer-reviewed and gray literature, expert solicitation, and on-the-ground adaptation projects. These are being linked through the Adaptation Workbook process to on-the-ground adaptation tactics being planned and employed in more than 50 adaptation "demonstrations". This presentation will touch on the scientific and professional basis of the vulnerability assessments, and showcase efforts where adaptation actions are currently being implemented in forests.

  18. Path planning and energy management of solar-powered unmanned ground vehicles

    NASA Astrophysics Data System (ADS)

    Kaplan, Adam

    Many of the applications pertinent to unmanned vehicles, such as environmental research and analysis, communications, and information-surveillance and reconnaissance, benefit from prolonged vehicle operation time. Conventional efforts to increase the operational time of electric-powered unmanned vehicles have traditionally focused on the design of energy-efficient components and the identification of energy efficient search patterns, while little attention has been paid to the vehicle's mission-level path plan and power management. This thesis explores the formulation and generation of integrated motion-plans and power-schedules for solar-panel equipped mobile robots operating under strict energy constraints, which cannot be effectively addressed through conventional motion planning algorithms. Transit problems are considered to design time-optimal paths using both Balkcom-Mason and Pseudo-Dubins curves. Additionally, a more complicated problem to generate mission plans for vehicles which must persistently travel between certain locations, similar to the traveling salesperson problem (TSP), is presented. A comparison between one of the common motion-planning algorithms and experimental results of the prescribed algorithms, made possible by use of a test environment and mobile robot designed and developed specifically for this research, are presented and discussed.

  19. Information Technology Resources Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-04-01

    The Information Technology Resources Assessment (ITRA) is being published as a companion document to the Department of Energy (DOE) FY 1994--FY 1998 Information Resources Management Long-Range Plan. This document represents a collaborative effort between the Office of Information Resources Management and the Office of Energy Research that was undertaken to achieve, in part, the Technology Strategic Objective of IRM Vision 21. An integral part of this objective, technology forecasting provides an understanding of the information technology horizon and presents a perspective and focus on technologies of particular interest to DOE program activities. Specifically, this document provides site planners with anmore » overview of the status and use of new information technology for their planning consideration.« less

  20. OEM Emergency Prevention and Mitigation Information

    EPA Pesticide Factsheets

    The Office of Emergency Management maintains information relevant to preventing emergencies before they occur, and/or mitigating the effects of emergency when they do occur. A principal element of this data asset is the information managed by the System for Risk Management Plans (SRMP), which compiles risk management plans submitted by facilities in accordance with the Clean Air Act, Section 112(r). Affected facilities are to develop risk management programs which will prevent and minimize consequences of accidental releases of certain hazardous chemicals that could harm public health and the environment.Another component of this data asset are the results generated by the Priority Assessment Model (PAM), which analyzes information concerning low-level chronic emissions from facilities and sets priorities (low, medium, high) for proactive controls on releases that do not necessarily pose imminent threats, but which may under adverse circumstances create unacceptable health or ecological risks.Also included are inspection records compiled by the Oil Inspection Program. Under the Clean Water Act Section 311, EPA regulates oil storage that meets a specific regulatory threshold. Facilities that store oil and meet the regulatory threshold need to prepare and implement a Spill Prevention, Control, and Countermeasures (SPCC) Plan which needs to be reviewed and approved by a professional engineer. Additionally, facilities with larger oil storage capacity may have to pre

  1. 76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...

  2. 40 CFR 130.6 - Water quality management plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  3. Integration of research advances in modelling and monitoring in support of WFD river basin management planning in the context of climate change.

    PubMed

    Quevauviller, Philippe; Barceló, Damia; Beniston, Martin; Djordjevic, Slobodan; Harding, Richard J; Iglesias, Ana; Ludwig, Ralf; Navarra, Antonio; Navarro Ortega, Alícia; Mark, Ole; Roson, Roberto; Sempere, Daniel; Stoffel, Markus; van Lanen, Henny A J; Werner, Micha

    2012-12-01

    The integration of scientific knowledge about possible climate change impacts on water resources has a direct implication on the way water policies are being implemented and evolving. This is particularly true regarding various technical steps embedded into the EU Water Framework Directive river basin management planning, such as risk characterisation, monitoring, design and implementation of action programmes and evaluation of the "good status" objective achievements (in 2015). The need to incorporate climate change considerations into the implementation of EU water policy is currently discussed with a wide range of experts and stakeholders at EU level. Research trends are also on-going, striving to support policy developments and examining how scientific findings and recommendations could be best taken on board by policy-makers and water managers within the forthcoming years. This paper provides a snapshot of policy discussions about climate change in the context of the WFD river basin management planning and specific advancements of related EU-funded research projects. Perspectives for strengthening links among the scientific and policy-making communities in this area are also highlighted. Copyright © 2012 Elsevier B.V. All rights reserved.

  4. Implementing health care reform in Israel: organizational response to perceived incentives.

    PubMed

    Gross, Revital

    2003-08-01

    Devising new incentives was a main element of health care reform in Israel, which created a regulated market that embodies many principles of managed competition. This study examined sick fund directors' perceptions of the new incentives and their strategic responses to these incentives, enabling the testing of how managed competition works in practice. The methodology used was a multiple case study of Israel's four sick funds. Data were gathered through in-depth interviews with 160 senior officials, analysis of national health insurance legislation, and analysis of published and unpublished archival documents, newspaper articles, public statements of senior managers, and other published data on the sick funds' behavior. The study revealed discrepancies between planned and perceived incentives and highlighted the effect of the latter on strategy formulation. Analysis of sick fund strategies showed that their responses to managed competition incentives deviated from theoretical expectations, compromising some of the objectives of the reform. The study also shows that contextual features account for the specific model of managed competition that was implemented and for the specific strategies employed by the sick funds. The study concludes by highlighting the need to build a process that will enable policy makers to consider local contextual factors when planning and implementing reform, involving health care providers in designing incentives, continuously monitoring processes and outcomes in the reformed system, and allowing for flexibility in policy making.

  5. NPTool: Towards Scalability and Reliability of Business Process Management

    NASA Astrophysics Data System (ADS)

    Braghetto, Kelly Rosa; Ferreira, João Eduardo; Pu, Calton

    Currently one important challenge in business process management is provide at the same time scalability and reliability of business process executions. This difficulty becomes more accentuated when the execution control assumes complex countless business processes. This work presents NavigationPlanTool (NPTool), a tool to control the execution of business processes. NPTool is supported by Navigation Plan Definition Language (NPDL), a language for business processes specification that uses process algebra as formal foundation. NPTool implements the NPDL language as a SQL extension. The main contribution of this paper is a description of the NPTool showing how the process algebra features combined with a relational database model can be used to provide a scalable and reliable control in the execution of business processes. The next steps of NPTool include reuse of control-flow patterns and support to data flow management.

  6. Participatory Scenario Planning for the Cienega Watershed: Embracing Uncertainty in Public Lands Management in the U.S. Southwest

    NASA Astrophysics Data System (ADS)

    Hartmann, H.; Morino, K.; Bodner, G.; Markstein, A.; McFarlin, S.

    2013-12-01

    Land managers and communities struggle to sustain natural landscapes and the benefits they provide--especially in an era of rapid and unpredictable changes being driven by shifts in climate and other drivers that are largely outside the control of local managers and residents. The Cienega Watershed Partnership (CWP) is a long-standing multi-agency partnership involved in managing lands and resources over about 700,000 acres in southeast Arizona, surrounding the Bureau of Land Management's Las Cienegas National Conservation Area. The region forms a vital wildlife corridor connecting the diverse ecosystems of the Sonoran and Chihuahuan deserts and grasslands with the Sierra Madrean and Rocky Mountain forests and woodlands. The CWP has long-standing forums and relationships for considering complex issues and novel approaches for management, including practical implementation of adaptive management, development of monitoring programs and protocols, and the use of nested objectives to adjust management targets. However, current plans have objectives and strategies based on what is known or likely to become known about natural and socio-cultural systems; they do not incorporate uncertainties related to rapid changes in climate or have well developed feedback mechanisms for routinely reconsidering climate information. Since 2011, more than 50 individuals from over 20 federal and local governments, non-governmental organizations, and private landowners have participated in scenario planning for the Cienega Watershed. Scenario planning is an important tool for (1) managing risks in the face of high volatility, uncertainty, complexity, and ambiguity; (2) integrating quantitative climate projections, trend and impact assessments, and local expertise to develop qualitative scenario narratives that can inform decisions even by simply provoking insights; and (3) engaging jurisdictions having different missions, objectives, and planning processes. Participants are helping to extend and refine participatory scenario planning methods from the development of regional qualitative narratives to (1) development of scenario narratives that are relevant at the local management level, (2) creation and evaluation of portfolios of management options that can accommodate changes in management objectives, connect to formal agency planning processes, and that can be adjusted as the future evolves, and (3) explicit identification of the data and information that link qualitative narratives to quantitative scenario and adaptation assessments, which can be used to drive the timing and implementation of activities within the adaptation portfolios, and to prioritize monitoring and research activities to resolve near-term uncertainties. Project tasks are structured around four resource teams that focus on their specific management concerns (Montane, Riparian, Upland and Cultural), but that come together periodically to consider interaction and conflict among their scenarios or prospective adaptation. Participants are finding that embracing uncertainty enables them to approach climate change with a sense of empowerment rather than a sense of reacting to crises, and they appreciate the methods and opportunities for thinking differently and crossing boundaries that the scenario planning exercises provide.

  7. An Air Force Guide to the System Specification.

    DTIC Science & Technology

    1981-01-01

    basis for sound management plans and decisions to initiate system full-scale development. Related topics include: current problems and questions...such current documents as AFR 800-2 and AFR 57-1. Key elements of coverage include the following: a. Levels of system engineering studies are...equipment and computer program elements of a system are acquired most directly acainst lower-level (configuration item) specifications. b. Current

  8. Product Definition Data Interface (PDDI) Product Specification

    DTIC Science & Technology

    1991-07-01

    syntax of the language gives a precise specification of the data without interpretation of it. M - Constituent Read Block. CSECT - Control Section, the...to conform to the PDDI Access Software’s internal data representation so that it may be further processed. JCL - Job Control Language - IBM language...software development and life cycle * phases. OUALITY CONTROL - The planned and systematic application of all actions (management/technical) necessary to

  9. Evaluating the State of Water Management in the Rio Grande/Bravo Basin

    NASA Astrophysics Data System (ADS)

    Ortiz Partida, Jose Pablo; Sandoval-Solis, Samuel; Diaz Gomez, Romina

    2017-04-01

    Water resource modeling tools have been developed for many different regions and sub-basins of the Rio Grande/Bravo (RGB). Each of these tools has specific objectives, whether it is to explore drought mitigation alternatives, conflict resolution, climate change evaluation, tradeoff and economic synergies, water allocation, reservoir operations, or collaborative planning. However, there has not been an effort to integrate different available tools, or to link models developed for specific reaches into a more holistic watershed decision-support tool. This project outlines promising next steps to meet long-term goals of improved decision support tools and modeling. We identify, describe, and synthesize water resources management practices in the RGB basin and available water resources models and decision support tools that represent the RGB and the distribution of water for human and environmental uses. The extent body of water resources modeling is examined from a perspective of environmental water needs and water resources management and thereby allows subsequent prioritization of future research and monitoring needs for the development of river system modeling tools. This work communicates the state of the RGB science to diverse stakeholders, researchers, and decision-makers. The products of this project represent a planning tool to support an integrated water resources management framework to maximize economic and social welfare without compromising vital ecosystems.

  10. Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pope, Jason E.

    The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that wemore » make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but also can be used as a guideline for meter installation and data analysis.« less

  11. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  12. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  13. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  14. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  15. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  17. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  18. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  19. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  20. Integrated corridor management initiative : demonstration phase evaluation, Dallas traveler response analysis test plan.

    DOT National Transportation Integrated Search

    1997-09-26

    This report is forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Specifically, this report: (1) Presents the goals and accomplishments of the ITS Program, which supports the de...

  1. Notification: Follow-up Audit of Prior OIG Recommendations on EPA's Workforce Management

    EPA Pesticide Factsheets

    October 16, 2012. The U.S. Environmental Protection Agency (EPA), Office of Inspector General (OIG), plans to begin audit work to evaluate the status of the Agency’s corrective actions for recommendations we made in 3 specific audit reports.

  2. 40 CFR 60.2095 - What site-specific documentation is required?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (5) Procedures for operating the incinerator and associated air pollution control systems within the... incinerator operating limits. (7) Reporting and recordkeeping procedures. (8) The waste management plan... required? 60.2095 Section 60.2095 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...

  3. A planning algorithm for quantifying decentralised water management opportunities in urban environments.

    PubMed

    Bach, Peter M; McCarthy, David T; Urich, Christian; Sitzenfrei, Robert; Kleidorfer, Manfred; Rauch, Wolfgang; Deletic, Ana

    2013-01-01

    With global change bringing about greater challenges for the resilient planning and management of urban water infrastructure, research has been invested in the development of a strategic planning tool, DAnCE4Water. The tool models how urban and societal changes impact the development of centralised and decentralised (distributed) water infrastructure. An algorithm for rigorous assessment of suitable decentralised stormwater management options in the model is presented and tested on a local Melbourne catchment. Following detailed spatial representation algorithms (defined by planning rules), the model assesses numerous stormwater options to meet water quality targets at a variety of spatial scales. A multi-criteria assessment algorithm is used to find top-ranking solutions (which meet a specific treatment performance for a user-defined percentage of catchment imperviousness). A toolbox of five stormwater technologies (infiltration systems, surface wetlands, bioretention systems, ponds and swales) is featured. Parameters that set the algorithm's flexibility to develop possible management options are assessed and evaluated. Results are expressed in terms of 'utilisation', which characterises the frequency of use of different technologies across the top-ranking options (bioretention being the most versatile). Initial results highlight the importance of selecting a suitable spatial resolution and providing the model with enough flexibility for coming up with different technology combinations. The generic nature of the model enables its application to other urban areas (e.g. different catchments, local municipal regions or entire cities).

  4. Some guidance on preparing validation plans for the DART Full System Models.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, Genetha Anne; Hough, Patricia Diane; Hills, Richard Guy

    2009-03-01

    Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generallymore » applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.« less

  5. Exploratory scoping of the literature on factors that influence oral health workforce planning and management in developing countries.

    PubMed

    Knevel, Rjm; Gussy, M G; Farmer, J

    2017-05-01

    The purpose of this study was to scope the literature that exists about factors influencing oral health workforce planning and management in developing countries (DCs). The Arksey and O'Malley method for conducting a scoping review was used. A replicable search strategy was applied, using three databases. Factors influencing oral health workforce planning and management in DCs identified in the eligible articles were charted. Four thousand citations were identified; 41 papers were included for review. Most included papers were situational analyses. Factors identified were as follows: lack of data, focus on the restorative rather than preventive care in practitioner education, recent increase in number of dental schools (mostly private) and dentistry students, privatization of dental care services which has little impact on care maldistribution, and debates about skill mix and scope of practice. Oral health workforce management in the eligible studies has a bias towards dentist-led systems. Due to a lack of country-specific oral health related data in developing or least developed countries (LDCs), oral health workforce planning often relies on data and modelling from other countries. Approaches to oral health workforce management and planning in developing or LDCs are often characterized by approaches to increase numbers of dentists, thus not ameliorating maldistribution of service accessibility. Governments appear to be reducing support for public and preventative oral healthcare, favouring growth in privatized dental services. Changes to professional education are necessary to trigger a paradigm shift to the preventive approach and to improve relationships between different oral healthcare provider roles. This needs to be premised on greater appreciation of preventive care in health systems and funding models. © 2016 The Authors. International Journal of Dental Hygiene Published by John Wiley & Sons Ltd.

  6. State Wildlife Action Plans as Tools for Adapting to a Continuously Changing Climate

    NASA Astrophysics Data System (ADS)

    Metivier, D. W.; Yocum, H.; Ray, A. J.

    2015-12-01

    Public land management plans are potentially powerful policies for building sustainability and adaptive capacity. Land managers are recognizing the need to respond to numerous climate change impacts on natural and human systems. For the first time, in 2015, the federal government required each state to incorporate climate change into their State Wildlife Action Plans (SWAP) as a condition for funding. As important land management tools, SWAPs have the potential to guide state agencies in shaping and implementing practices for climate change adaptation. Intended to be revised every ten years, SWAPs can change as conditions and understanding of climate change evolves. This study asks what practices are states using to integrate climate change, and how does this vary between states? To answer this question, we conducted a broad analysis among seven states (CO, MT, NE, ND, SD, UT, WY) and a more in-depth analysis of four states (CO, ND, SD, WY). We use seven key factors that represent best practices for incorporating climate change identified in the literature. These best practices are species prioritization, key habitats, threats, monitoring, partnerships and participation, identification of management options, and implementation of management options. The in-depth analysis focuses on how states are using climate change information for specific habitats addressed in the plans. We find that states are integrating climate change in many different ways, showing varying degrees of sophistication and preparedness. We summarize different practices and highlight opportunities to improve the effectiveness of plans through: communication tools across state lines and stakeholders, explicit targeting of key habitats, enforcement and monitoring progress and success, and conducting vulnerability analyses that incorporate topics beyond climate and include other drivers, trajectories, and implications of historic and future land-use change.

  7. Knowledge management in healthcare: towards 'knowledge-driven' decision-support services.

    PubMed

    Abidi, S S

    2001-09-01

    In this paper, we highlight the involvement of Knowledge Management in a healthcare enterprise. We argue that the 'knowledge quotient' of a healthcare enterprise can be enhanced by procuring diverse facets of knowledge from the seemingly placid healthcare data repositories, and subsequently operationalising the procured knowledge to derive a suite of Strategic Healthcare Decision-Support Services that can impact strategic decision-making, planning and management of the healthcare enterprise. In this paper, we firstly present a reference Knowledge Management environment-a Healthcare Enterprise Memory-with the functionality to acquire, share and operationalise the various modalities of healthcare knowledge. Next, we present the functional and architectural specification of a Strategic Healthcare Decision-Support Services Info-structure, which effectuates a synergy between knowledge procurement (vis-à-vis Data Mining) and knowledge operationalisation (vis-à-vis Knowledge Management) techniques to generate a suite of strategic knowledge-driven decision-support services. In conclusion, we argue that the proposed Healthcare Enterprise Memory is an attempt to rethink the possible sources of leverage to improve healthcare delivery, hereby providing a valuable strategic planning and management resource to healthcare policy makers.

  8. Planning for the recreational end use of a future LLR waste mound in Canada - Leaving an honourable legacy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kleb, H.R.; Zelmer, R.L.

    2007-07-01

    The Low-Level Radioactive Waste Management Office was established in 1982 to carry out the federal government's responsibilities for low-level radioactive (LLR) waste management in Canada. In this capacity, the Office operates programs to characterize, delineate, decontaminate and consolidate historic LLR waste for interim and long-term storage. The Office is currently the proponent of the Port Hope Area Initiative; a program directed at the development and implementation of a safe, local long-term management solution for historic LLR waste in the Port Hope area. A legal agreement between the Government of Canada and the host community provides the framework for the implementationmore » of the Port Hope Project. Specifically, the agreement requires that the surface of the long-term LLR waste management facility be 'conducive to passive and active recreational uses such as soccer fields and baseball diamonds'. However, there are currently no examples of licensed LLR waste management facilities in Canada that permit recreational use. Such an end use presents challenges with respect to engineering and design, health and safety and landscape planning. This paper presents the cover system design, the environmental effects assessment and the landscape planning processes that were undertaken in support of the recreational end use of the Port Hope long-term LLR waste management facility. (authors)« less

  9. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60.2899 Section 60.2899 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  10. 40 CFR 60.2620 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Commercial and Industrial Solid Waste Incineration Units Model Rule-Waste Management Plan § 60.2620 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  11. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  12. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  13. A medium-term, stochastic forecast model to support sustainable, mixed fisheries management in the Mediterranean Sea.

    PubMed

    Rätz, H-J; Charef, A; Abella, A J; Colloca, F; Ligas, A; Mannini, A; Lloret, J

    2013-10-01

    A medium-term (10 year) stochastic forecast model is developed and presented for mixed fisheries that can provide estimations of age-specific parameters for a maximum of 10 stocks and 10 fisheries. Designed to support fishery managers dealing with complex, multi-annual management plans, the model can be used to quantitatively test the consequences of various stock-specific and fishery-specific decisions, using non-equilibrium stock dynamics. Such decisions include fishing restrictions and other strategies aimed at achieving sustainable mixed fisheries consistent with the concept of maximum sustainable yield (MSY). In order to test the model, recently gathered data on seven stocks and four fisheries operating in the Ligurian and North Tyrrhenian Seas are used to generate quantitative, 10 year predictions of biomass and catch trends under four different management scenarios. The results show that using the fishing mortality at MSY as the biological reference point for the management of all stocks would be a strong incentive to reduce the technical interactions among concurrent fishing strategies. This would optimize the stock-specific exploitation and be consistent with sustainability criteria. © 2013 The Fisheries Society of the British Isles.

  14. Quality Control Review of the Defense Contract Management Agency Internal Review Audit Function

    DTIC Science & Technology

    2013-04-18

    DMI-2011-001, “Audit of DCMA Telework Program,” November 29, 2011, we identified issues with independence. For the Audit of DCMA Telework Program...and Audit of DCMA Telework Program, we identified issues with audit planning. Specifically, we found that both audits did not include documentation...of fraud risks had been performed during audit planning. For the audit of the DCMA Telework Program, steps were added to the audit program to

  15. Assessment of reservoir system variable forecasts

    NASA Astrophysics Data System (ADS)

    Kistenmacher, Martin; Georgakakos, Aris P.

    2015-05-01

    Forecast ensembles are a convenient means to model water resources uncertainties and to inform planning and management processes. For multipurpose reservoir systems, forecast types include (i) forecasts of upcoming inflows and (ii) forecasts of system variables and outputs such as reservoir levels, releases, flood damage risks, hydropower production, water supply withdrawals, water quality conditions, navigation opportunities, and environmental flows, among others. Forecasts of system variables and outputs are conditional on forecasted inflows as well as on specific management policies and can provide useful information for decision-making processes. Unlike inflow forecasts (in ensemble or other forms), which have been the subject of many previous studies, reservoir system variable and output forecasts are not formally assessed in water resources management theory or practice. This article addresses this gap and develops methods to rectify potential reservoir system forecast inconsistencies and improve the quality of management-relevant information provided to stakeholders and managers. The overarching conclusion is that system variable and output forecast consistency is critical for robust reservoir management and needs to be routinely assessed for any management model used to inform planning and management processes. The above are demonstrated through an application from the Sacramento-American-San Joaquin reservoir system in northern California.

  16. Seismology software: state of the practice

    NASA Astrophysics Data System (ADS)

    Smith, W. Spencer; Zeng, Zheng; Carette, Jacques

    2018-05-01

    We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.

  17. Seismology software: state of the practice

    NASA Astrophysics Data System (ADS)

    Smith, W. Spencer; Zeng, Zheng; Carette, Jacques

    2018-02-01

    We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.

  18. Optimism in Enrollment Management

    ERIC Educational Resources Information Center

    Buster-Williams, Kimberley

    2016-01-01

    Enrollment managers, like most managers, have goals that must be focused on with precision, excitement, and vigor. Enrollment managers must excel at enrollment planning. Typically, enrollment planning unites undergraduate and graduate recruitment plans, out-of-state recruitment plans, marketing plans, retention plans, international enrollment…

  19. National Aeronautics and Space Administration FY 02 Revised Final Annual Performance Plan

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The Government Performance and Results Act (GPRA) was passed by Congress and signed by the President in 1993. GPRA was enacted to improve the efficiency of all Federal agencies, with the following specific goals: (1) Improve Federal program management, effectiveness, and public accountability; (2) Improve Congressional decision making on where to commit the Nation's financial and human resources; and (3) Improve citizen confidence in government performance. GPRA directs Executive Branch agencies to develop a customer-focused strategic plan that aligns activities with concrete missions and goals. The Act directs agencies to manage and measure results to justify Congressional appropriations and authorizations. The Report Consolidation Act of 2000 directs agencies to provide a report on the degree of success in achieving the goals and performance measures defined in the strategic and performance plans one hundred and fifty days after the completion of the fiscal year.

  20. Hazardous-waste analysis plan for LLNL operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, R.S.

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan willmore » address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.« less

  1. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  2. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  3. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  4. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  5. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  6. 40 CFR 60.2899 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Modification or Reconstruction is Commenced on or After June 16, 2006 Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility...

  7. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  8. 40 CFR 60.2055 - What is a waste management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What is a waste management plan? 60... Industrial Solid Waste Incineration Units Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  9. 40 CFR 62.14580 - What is a waste management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  10. Surgery and Research: A Practical Approach to Managing the Research Process

    PubMed Central

    Swiatek, Peter R.; Chung, Kevin C.; Mahmoudi, Elham

    2016-01-01

    Following a practical project management method is essential in completing a research project on time and within budget. Although this concept is well developed in the business world, it has yet to be explored in academic surgical research. Defining and adhering to a suitable workflow would increase portability, reusability, and therefore, efficiency of the research process. In this article, we briefly review project management techniques. We specifically underline four main steps of project management: (1) definition and organization, (2) planning, (3) execution, and (4) evaluation, using practical examples from our own multidisciplinary plastic surgery research team. PMID:26710037

  11. Risky Business

    NASA Technical Reports Server (NTRS)

    Yarbrough, Katherine

    2015-01-01

    During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.

  12. Post-event reviews: Using a quantitative approach for analysing incident response to demonstrate the value of business continuity programmes and increase planning efficiency.

    PubMed

    Vaidyanathan, Karthik

    2017-01-01

    Business continuity management is often thought of as a proactive planning process for minimising impact from large-scale incidents and disasters. While this is true, and it is critical to plan for the worst, consistently validating plan effectiveness against smaller disruptions can enable an organisation to gain key insights about its business continuity readiness, drive programme improvements, reduce costs and provide an opportunity to quantitatively demonstrate the value of the programme to management. This paper describes a post mortem framework which is used as a continuous improvement mechanism for tracking, reviewing and learning from real-world events at Microsoft Customer Service & Support. This approach was developed and adopted because conducting regular business continuity exercises proved difficult and expensive in a complex and distributed operations environment with high availability requirements. Using a quantitative approach to measure response to incidents, and categorising outcomes based on such responses, enables business continuity teams to provide data-driven insights to leadership, change perceptions of incident root cause, and instil a higher level of confidence towards disaster response readiness and incident management. The scope of the framework discussed here is specific to reviewing and driving improvements from operational incidents. However, the concept can be extended to learning and evolving readiness plans for other types of incidents.

  13. Current Practices in Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB)

    NASA Technical Reports Server (NTRS)

    Lohr, Gary W.; Williams, Daniel M.

    2008-01-01

    Significant air traffic increases are anticipated for the future of the National Airspace System (NAS). To cope with future traffic increases, fundamental changes are required in many aspects of the air traffic management process including the planning and use of NAS resources. Two critical elements of this process are the selection of airport runway configurations, and the effective management of active runways. Two specific research areas in NASA's Airspace Systems Program (ASP) have been identified to address efficient runway management: Runway Configuration Management (RCM) and Arrival/Departure Runway Balancing (ADRB). This report documents efforts in assessing past as well as current work in these two areas.

  14. Flexibility in flood management design: proactive planning under uncertainty

    NASA Astrophysics Data System (ADS)

    Smet, K.; de Neufville, R.; van der Vlist, M.

    2016-12-01

    This paper presents a value-enhancing approach for proactive planning and design of long-lived flood management infrastructure given uncertain future flooding threats. Designing infrastructure that can be adapted over time is a method to safeguard the efficacy of current design decisions given future uncertainties. We explore the value of embedding "options" in a physical structure, where an option is the right but not the obligation to do something at a later date (e.g. over-dimensioning a floodwall foundation now facilitates a future height addition in response to observed increases in sea level; building extra pump bays in a drainage pumping station enables the easy addition of pumping capacity whenever increased precipitation warrants an expansion.) The proposed approach couples a simulation model that captures future climate induced changes to the hydrologic operating environment of a structure, with an economic model that estimates the lifetime economic performance of alternative investment strategies. The economic model uses Real "In" Options analysis, a type of cash flow analysis that quantifies the implicit value of options and the flexibility they provide. We demonstrate the approach using replacement planning for the multi-functional pumping station IJmuiden on the North Sea Canal in the Netherlands. The analysis models flexibility in design decisions, varying the size and specific options included in the new structure. Results indicate that the incorporation of options within the structural design has the potential to improve its economic performance, as compared to more traditional, "build it once and build it big" designs where flexibility is not an explicit design criterion. The added value resulting from the incorporation of flexibility varies with the range of future conditions considered, and the specific options examined. This approach could be applied to explore investment strategies for the design of other flood management structures, as well as be expanded to look more at flexibility within an infrastructure network rather than a single structure. Flexibility in flood management design:proactive planning under uncertainty

  15. Notification: Follow-Up on Significant Information Technology Security Findings and Recommendations

    EPA Pesticide Factsheets

    Project #OA-FY14-0056, January 17, 2014. The EPA OIG plans to begin preliminary research to follow up on recommendations issued in its final reports between specific fiscal years, and reports associated with the FY 2013 OIG Management Challenges memo.

  16. Professional Development and TransLink[R]. Final Report.

    ERIC Educational Resources Information Center

    Kuhn, Beverly T.; Jasek, Deborah

    This report covers one segment of a larger professional development program for transportation professionals that addresses the need to develop a larger cadre of transportation professionals capable of designing, planning, managing, operating, and maintaining the transportation infrastructure nationwide. Three specific tasks were undertaken and…

  17. 7 CFR 1710.251 - Construction work plans-distribution borrowers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... generation facilities; (11) Load management equipment, automatic sectionalizing facilities, and centralized... transmission plant, and improvements replacements, and retirements of any generation plant. Construction of new generation capacity need not be included in a CWP but must be specified and supported by specific engineering...

  18. Organizational Influences on the University Electronic Library.

    ERIC Educational Resources Information Center

    Davies, Clare

    1997-01-01

    Reviews the literature on the development of full-text electronic libraries in the academic setting. Organizational factors can have impact on electronic library development and ultimate usability. Topics include strategic management, planning and implementation; system specification and design; document provision; user support and training; and…

  19. 75 FR 13253 - Plan Revision for Lake Tahoe Basin Management Unit, Alpine, El Dorado, and Placer Counties, CA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... need for change document, the ``CER'' (Nov 2006) is available online at: http://fs.usda.gov/ltbmu... Report (CER)'' and request for public and partner agency comments specific to the unit's need for change...

  20. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management...

Top